Loading...
HomeMy WebLinkAboutRE_ Amazon Roundabout - Paving Plan following Core Work - HOTMark and Paul, This looks good. Please proceed as shown on the pdf. Thank you, MICHAEL S. SIPPO, Civil Engineer III City of Renton | CED | Development Engineering Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center <https://rentonwa.gov/cms/One.aspx?portalId=7922741&pageId=17625638> | Online Applications and Inspections <https://permitting.rentonwa.gov/#/home> (425) 430-7298| msippo@rentonwa.gov <mailto:msippo@rentonwa.gov> From: Mark Wilhelm <markw@ceccantiinc.com> Sent: Monday, June 26, 2023 4:20 PM To: Paul.Tosello@skanska.com; Michael Sippo <MSippo@Rentonwa.gov>; Thomas Main <TMain@Rentonwa.gov>; Nathan Janders <NJanders@Rentonwa.gov> Cc: Bill Parsons <billp@ceccantiinc.com>; Mark Wilhelm <markw@ceccantiinc.com>; Marc Olsen <marc@ceccantiinc.com>; Orr, Jeremy <Jeremy.Orr@skanska.com>; Amsbaugh, Kory <kory.amsbaugh@skanska.com>; steve.eichelberger@iconmaterials.com; Nelson, Steven (ICON Materials) <steven.nelson@iconmaterials.com> Subject: Amazon Roundabout - Paving Plan following Core Work - HOT Importance: High CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Paul / Michael, Please see attached sketch depicting the existing asphalt thickness’s encountered today following core work. -RED DOTS = Core Location and Existing Asphalt Depth (Core Locations were determined by existing seams in the asphalt visible on the surface) -GREEN Highlighted areas = 2” Grind and Overlay (Per plan) - ORANGE Highlighted areas = Complete removal and replacement with 6” Rock Section / 4” HMA Base Course / 2” HMA Wear Course. As anticipated, the Northern Section on Raymond is very thin. We intend to do full depth removal and replacement to the existing asphalt patch as was discussed in the field during the meeting Friday the 23rd. This game plan was discussed in the field this afternoon with Tom Main, but we will need final buyoff from Michael to move forward. The Grind Date is this Wednesday the 28th and Paving the next day the 29th. If Paving cannot be completed on the 29th, the next available paving slot is July 11th. Thank you for a timely response in advance !! Mark Wilhelm Superintendent Ceccanti, Inc. (253) 377-6178