HomeMy WebLinkAboutC_On_Hold_Letter_230628_v1 June 28, 2023 Dylan Marcus Puget Sound Energy 6500 Ursula Place South Seattle, WA 98108 SUBJECT: "On Hold" Notice Thermal Survey Borings for Replacement Cable Crossings / LUA23-000180, SME Dear Mr. Marcus, The Planning Division of the City of Renton accepted the above master application for review on May 26, 2023. During our review, staff has determined that additional information is necessary in order to proceed further. The following information will need to be submitted before September 28, 2023 so that we may continue the review of the above subject application: 1. Address the following items from the U.S. Environmental Protection Agency (EPA): a. Update the No Effects Biological Evaluation Letter to acknowledge that Location I is within a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) or Superfund site boundary so that the National Oceanic and Atmospheric Administration (NOAA) is made aware while reviewing the “No effects” determination. i. See attached Quendall Terminals (QTS) Site Map (Figure 1.1-2) with the power transmission line compared to the offshore Operable Unit 2 (OU2) boundary for the cleanup of the QTS Superfund site. The offshore portion of the QTS Superfund site extends into Lake Washington (OU2) and covers about 29 acres. The figure shows that proposed borings/sampling would occur in an Enhanced Natural Recovery (ENR) area. b. Identify any action taken by Puget Sound Energy (PSE) to notify Quendall Terminals Responsible Parties (RPs) of PSE’s proposed sampling effort within OU2 and the proposed future plans to replace the cable crossings that go through OU2. If RPs have not yet been notified, provide a notification plan. c. Identify any BMPs that would contribute to no sediment disturbance or water quality impacts. i. Because the OU2 remedy has not occurred yet, PSE is able to anchor and collect a sample in OU2. Once OU2 is cleaned up, there will be Institutional Controls (ICs) that will restrict certain uses or activities. For example, no anchoring/no disturbances to protect the remedy. d. Provide a detailed timeline of the proposed borings and future plans to replace the cable crossings. i. If possible, the EPA recommends that the replacement cable crossings be completed prior the OU2 Remedial Action (RA) activities or the location of the cable crossings be adjusted to avoid OU2 area. The RA includes placing a six-inch (6”) layer of clean sand to address low level contaminants in the sediment and to accelerate the rate of natural recovery. There will be institutional controls post remedy restricting OU2 remedy disturbance. If the remedy is disturbed, there will likely be requirements to characterize the area post disturbance, replenish and replace the cap and ENR material, and demonstrate the mitigation meets performance standards. e. Boring samples are proposed to be collected and removed from QTS Superfund site with the OU2 area. Characterize the material and identify the appropriate disposal process of the samples collected from the OU2 area. At this time, your project has been placed “on hold” pending receipt of the requested information. The maximum time for resubmittal shall be within ninety (90) days of this notice. Please contact me at (425) 430-7289 if you have any questions. Sincerely, Clark H. Close Principal Planner Attachment: QTS Site Map Figure 1.1-2 cc: Christopher / Party(ies) of Record N 42nd Pl N 41st P lPSE EnergySubstation Eastside Rail Corridor TrailSeahawks WayFootball NorthwestProperty (Former Baxter Site) Conner Homes Property (Former Barbee Mill Site)NE 44th St? ±200 0 200100Feet Project No. Figure No. MEM1679 1.1-2 Designed By Reviewed By Drawn By Date JMW HD JMW 07/28/20Site Map Quendall Terminals Renton, Washington Service Layer Credits: Source: Esri, DigitalGlobe, GeoEye,Earthstar Geographics, CNES/Airbus DS, USDA, USGS,AeroGRID, IGN, and the GIS User Community Legend Property Boundary Operating Unit 1 (OU1) Operating Unit 2 (OU2) Power Transmission Line Sanitary Sewer Gravity Main Water Main