HomeMy WebLinkAboutPRE23-000172_Meeting SummaryPREAPPLICATION MEETING FOR
Renton Sailing Center Dock Lockers
PRE 23-000172
CITY OF RENTON
Department of Community & Economic Development
Planning Division
June 29, 2023
Contact Information:
Planner: Jill Ding, 425.430.6598, jding@rentonwa.gov
Public Works Plan Reviewer: Scott Warlick, 425-430-7216, swarlick@rentonwa.gov
Fire Prevention Reviewer: Corey Thomas, 425.276.9582, cthomas@RentonRFA.org
Building Department Reviewer: Rob Shuey, 425.430.7235
Please retain this packet throughout the course of your project as a reference. Consider
giving copies of it to any engineers, architects, and contractors who work on the
project. You will need to submit a copy of this packet when you apply for land use
and/or environmental permits.
Pre-screening: When you have the project application ready for submittal, call and
schedule an appointment with the project manager to have it pre-screened before
formal submittal.
The pre-application meeting is informal and non-binding. The comments provided on
the proposal are based on the codes and policies in effect at the time of review. The
applicant is cautioned that the development regulations are regularly amended and the
proposal will be formally reviewed under the regulations in effect at the time of project
submittal. The information contained in this summary is subject to modification and/or
concurrence by official decision-makers (e.g., Hearing Examiner, Planning Director,
Development Services Director, Department of Community & Economic Development
Administrator, Public Works Administrator and City Council).
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: June 28, 2023
TO: Scott Warlick, Development Engineering
FROM: Jill Ding, Planning
SUBJECT: Renton Rowing Dock Replacement (Parcel number 3344500775)
1201 Lake Washington Blvd N
PRE23-000172
NOTE: The applicant is cautioned that information contained in this summary is preliminary and non-
binding and may be subject to modification and/or concurrence by official City decision-makers. Review
comments may also need to be revised based on site planning and other design changes required by
City staff or made by the applicant.
I have completed a preliminary review for the above-referenced proposal located at parcel(s)
3344500775. The following comments are based on the pre-application submittal made to the City of
Renton by the applicant.
WATER
1. Water Service is not a requirement for this project.
SEWER
1. Sewer service is not a requirement for this project.
SURFACE WATER
1. City records indicate that there is a 24” surface water main that outfalls underneath or adjacent
to the docks. The location and nature of the main is unknown and consideration will need to
be taken if work occurs near the main’s mapped location through the permitting process.
2. Refer to Figure 1.1.2.A – Flow Chart in the 2022 RSWDM to determine what type of drainage
review is required for this site. A drainage study complying with the 2022 City of Renton Surface
Water Manual will be required. Based on the City’s flow control map, this site falls within the
Peak Rate Flow Control Standard (Existing Conditions). The site is located in the Lake
Washington drainage basin. Drainage report and drainage plans based on 2022 City of Renton
Surface Water Design Manual are required to be provided. A preliminary drainage plan and
drainage report, including the application of flow control BMPs, shall be included with the land
use application.
3. The development is subject to a Targeted Drainage Review - Category 1 and must demonstrate
that the proposed project complies with a minimum 1 core requirement (Core Requirement #5
PRE23-000172
Page 3 of 3
June 28, 2023
- Erosion and Sediment Control) and 5 of 6 special requirements (SR #1 - Area Specific
Requirements, #2 - Flood Hazard Delineation, #3 - Flood Protection Facilities, #4 - Source
Control, and #6 - Aquifer Protection) as outlined in the RSWDM. Additional requirements may
be applied by CED based on project or site-specific conditions. Documentation of compliance
is required.
4. Erosion control and stormwater pollution prevention measures to meet the City requirements
per Core Requirement #5 of the 2022 RSWDM shall be provided. During construction, the
contractor shall prevent all dust, drips, debris and spills from coming in contact with the water’s
surface
5. A leachable metal surface consists of, or is coated with a non-ferrous metal that is soluble in
water. Refer to the 2022 RSWDM, pg. 6-19 “Use of Metal Materials” when considering the
material to be used for the dock lockers.
6. A Construction Stormwater General Permit from Department of Ecology may be required due
to the overwater nature of the construction activity being proposed. A Stormwater Pollution
Prevention Plan (SWPPP) is required for this site.
7. The current City of Renton Surface Water Standard Plans that shall be used in all drainage
submittals are available online at the City of Renton website
8. The development is not subject to stormwater system development charges (SDC fee).
TRANSPORTATION
1. Construction mitigation shall take into account project impacts to park, fire, vehicle, bicycle and
pedestrian traffic where the site accesses from Lake Washington Blvd N. Construction staging
will need to take into account the ability of emergency vehicles to utilize the drives and the park
turnaround area.
2. A conceptual pedestrian and bicycle detour and signage plan shall be submitted with the land-
use application for review by the City’s Transportation and Parks Department as applicable and
if staging will occur offsite.
3. A traffic impact analysis is not required.
General Comments
1. All construction utility permits for utility and street improvements will require separate plan
submittals. All utility plans shall confirm to the Renton Drafting Standards. A licensed Civil Engineer
shall prepare the civil plans. Please visit the Development Engineering Forms page for the most up-
to-date plan submittal requirements:
http://rentonwa.gov/business/default.aspx?id=42473
2. Fees quoted in this document reflect the fees applicable in the year 2023 only and will be assessed
based on the fee that is current at the time of the permit application or issuance, as applicable to the
permit type. Please visit www.rentonwa.gov for the current development fee schedule.
DEPARTMENT OF COMMUNITY
& ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: June 29, 2023
TO: Pre-application File No. 23-000172
FROM: Jill Ding, Senior Planner
SUBJECT: Renton Sailing Center Lockers – 2550 Lake Washington Blvd N
(Parcel No. 0523059010)
General: We have completed a preliminary review of the pre-application for the above-
referenced development proposal. The following comments on development and permitting
issues are based on the pre-application submittals made to the City of Renton by the applicant
and the codes in effect on the date of review. The applicant is cautioned that information
contained in this summary may be subject to modification and/or concurrence by official
decision-makers (e.g., Hearing Examiner, Community & Economic Development Administrator,
Public Works Administrator, Planning Director, Development Services Director, and City
Council). Review comments may also need to be revised based on site planning and other design
changes required by City staff or made by the applicant. The applicant is encouraged to review
all applicable sections of the Renton Municipal Code. The Development Regulations are
available online at www.rentonwa.gov.
Project Proposal: The project site is located on the existing sailing center docks, located within
Lake Washington, near the bathrooms at the north end of Gene Coulon Park and is addressed at
2550 Lake Washington Blvd N (parcel no. 0523059010). Renton Sailing Center operates a
Community Sailing Center in Gene Coulon Park for members, the public, and sailing lessons.
Dock lockers are relied upon to secure and prevent ultraviolet and water damage to sails, sailing
gear, education materials, safety equipment and more necessary to operate a Community
Sailing Center. The current dock lockers were built by volunteers in approximately 1980. They
are wood frames with painted plywood siding and have an existing footprint of 60.50 sq. ft. The
current lockers have heavy plywood doors that require a volunteer to lift overhead to access the
lockers. Some of the plywood is rotting due to water intrusion and minks routinely chewing their
way in and nesting/pooping in our sails. The proposal is to replace the existing lockers with a
new wood frame, metal sided locker that would meet the current and future storage needs at
the Sailing Center. The lockers would incorporate roll up doors like the ones at a self-storage
facility. The existing chain link fence would be replaced with a gate. The proposal would include
an overhanging roof to provide sun and rain protection. Three proposed designs were included
with the submittal, Alternative A (preferred), C, and Cr1. Alternative A would have a footprint of
206.10 sq. ft., Alternative C would have a footprint of 131.86 sq. ft. with a 97.93 sq. ft.
retractable sunshade, and Alternative Cr1 would have a footprint of 60.50 sq. ft.
The project site is located within Lake Washington and is subject to the requirements of the
Shoreline Management Act and Shoreline Master Program. No changes in access are proposed.
Renton Sailing Center Lockers
Page 2 of 5
June 29, 2023
The project site is located within the Shoreline Aquatic Designation of Lake Washington, Reach
F.
Current Use: The site is currently developed with an existing sailing center.
Shoreline Master Program: The project site is located within Lake Washington and would be
subject to the requirements of the Aquatic Designation. Active recreation, boat launching, and
boat moorage uses are outright permitted uses within the Aquatic Designation, provided the use
is water-dependent (RMC 4-3-090E.1). Boat houses are prohibited within the Aquatic
Designation. The proposed storage lockers would not be considered a boat house, as the
lockers would be utilized for the storage of accessories for the sailing center boats, but not for
the storage of the boats themselves. The proposed lockers would be located on an existing
dock and would not result in an increase in overwater coverage.
Water-Dependent Uses: Water-dependent commercial and community service uses shall be
given preference over water-related and water-enjoyment commercial and community service
uses. Prior to approval of water-dependent uses, the Administrator shall review a proposal for
design, layout, and operation of the use and shall make specific findings that the use qualifies as
a water-dependent use. Water-dependent commercial and community service uses shall
provide public access in a manner that will not interfere with the water-dependent aspects of
the use. The portion of a site not required for water-oriented use may include multiple use,
approved non-water-oriented uses, ecological restoration, and public access. The existing
sailing center would be considered a water-dependent use.
Commercial and Community Services: New commercial and community services developments
are subject to the following:
Over-Water Structures – Over-water structures are allowed only for those portions of water-
dependent commercial uses that require over-water facilities or for public recreation and public
access facilities. Non-water-dependent commercial uses shall not be allowed over water except
in limited instances where they are appurtenant to and necessary in support of water-
dependent uses.
Setbacks – Public access adjacent to the water may be located within the required setback,
subject to the standards for impervious surface in subsection D7a of this Section, Setbacks, for
non-water-oriented commercial buildings and shall be located no closer than one hundred feet
(100') from the OHWM; provided, this requirement may be modified in accordance with
subsection F1 of this Section, Vegetation Conservation.
Scenic and Aesthetic Qualities – All new or expanded commercial and community services
developments shall take into consideration the scenic and aesthetic qualities of the shoreline
and compatibility with adjacent uses as provided in subsection D3 of this Section, Use
Compatibility and Aesthetic Effects and subsection D5 of this Section, Building and Development
Location – Shoreline Orientation.
Recreation:
When Allowed – Recreation activities are allowed when:
Renton Sailing Center Lockers
Page 3 of 5
June 29, 2023
i. There is no net loss of ecological functions, including on- and off-site mitigation. A lake study
would be required to be submitted at the time of formal land use application demonstrating
that the proposed locker replacement would not result in a net loss of ecological functions.
ii. Water-related and water-enjoyment uses do not displace water-dependent uses and are
consistent with existing water-related and water-enjoyment uses.
iii. The level of human activity involved in passive or active recreation shall be appropriate to the
ecological features and shoreline environment.
iv. State-owned shorelines shall be recognized as particularly adapted to providing wilderness
beaches, ecological study areas, and other recreational uses for the public in accordance with
RCW 90.58.100(4).
Location Relative to the Shoreline – Activities provided by recreational facilities must bear a
substantial relationship to the shoreline, or provide physical or visual access to the shoreline.
i. Water-dependent recreation such as fishing, swimming, boating, and wading should be
located on the shoreline.
ii. Water-related recreation such as picnicking, hiking, and walking should be located near the
shoreline.
iii. Non-water-related recreation facilities shall be located inland. Recreational facilities with
large grass areas, such as golf courses and playing fields, and facilities with extensive impervious
surfaces shall observe vegetation management standards providing for native vegetation buffer
areas along the shoreline.
Over-Water Structures – Over-water structures for recreation use shall be allowed only when:
i. They allow opportunities for substantial numbers of people to enjoy the shorelines of the
State.
ii. They are not located in or adjacent to areas of exceptional ecological sensitivity, especially
aquatic and wildlife habitat areas.
iii. They are integrated with other public access features, particularly when they provide limited
opportunities to approach the water’s edge in areas where public access is set back to protect
sensitive ecological features at the water’s edge.
iv. No net loss of ecological functions will result.
Public Recreation – Public recreation uses shall be permitted within the shoreline only when the
following criteria are considered:
i. The natural character of the shoreline is preserved and the resources and ecology of the
shoreline are protected.
Renton Sailing Center Lockers
Page 4 of 5
June 29, 2023
ii. Accessibility to the water’s edge is provided consistent with public safety needs and in
consideration of natural features.
iii. Recreational development shall be of such variety as to satisfy the diversity of demands of
the local community.
iv. Water-related and water-enjoyment uses do not displace water-dependent uses and uses are
consistent with existing water-related and water-enjoyment uses.
v. Recreational development is located and designed to minimize detrimental impact on the
adjoining property.
vi. The development provides parking and other necessary facilities to handle the designed
public use.
vii. Effects on private property are consistent with all relevant constitutional and other legal
limitations on regulation or acquisition of private property.
viii. Public parks and other public lands shall be managed in a manner that provides a balance
between providing opportunities for recreation and restoration and enhancement of the
shoreline. Major park development shall be approved only after a master planning process that
provides for a balance of these elements.
Environmental Review: Per WAC 197-11-088, the following activities shall be categorically
exempt from Environmental (SEPA) Review: The repair, remodeling, maintenance, or minor
alteration of existing private or public structures, facilities or equipment, including utilities,
recreation, and transportation facilities involving no material expansions or changes in use
beyond that previously existing; except that, where undertaken wholly or in part on lands
covered by water, only minor repair or replacement of structures may be exempt (examples
include repair or replacement of piling, ramps, floats, or mooring buoys, or minor repair,
alteration, or maintenance of docks). Alternative’s A and C would include the replacement and
expansion to an existing development located on lands covered by water and would therefore
be subject to Environmental (SEPA) Review. Alternative Cr1 would include the replacement of
an existing structure without expansion and would be exempt from Environmental (SEPA)
Review.
Shoreline Permit Requirements: Per WAC 173-27-40 of the Shoreline Management Act, normal
maintenance or repair of existing structures or developments, including damage by accident,
fire or elements. "Normal maintenance" includes those usual acts to prevent a decline, lapse, or
cessation from a lawfully established condition. "Normal repair" means to restore a
development to a state comparable to its original condition, including but not limited to its size,
shape, configuration, location and external appearance, within a reasonable period after decay
or partial destruction, except where repair causes substantial adverse effects to shoreline
resource or environment. Replacement of a structure or development may be authorized as
repair where such replacement is the common method of repair for the type of structure or
development and the replacement structure or development is comparable to the original
structure or development including but not limited to its size, shape, configuration, location and
external appearance and the replacement does not cause substantial adverse effects to
Renton Sailing Center Lockers
Page 5 of 5
June 29, 2023
shoreline resources or environment. Alternative’s A and C would include the replacement and
expansion to an existing development located on lands covered by water and would therefore
be subject to a Shoreline Substantial Development Permit. Alternative Cr1 would include the
replacement of an existing structure without expansion and would be subject to a Shoreline
Exemption.
Permit Requirements: A Shoreline Substantial Development Permit and Environmental (SEPA)
Review would be reviewed concurrently within an estimated time frame of 6-8 weeks. The 2023
permit fees would total $5,071.50 ($1,800 SEPA + $3,030 Shoreline + $241.50 Technology Fee =
$5,071.50). All fees are subject to changes.
A Shoreline Exemption application would be reviewed within an estimated time frame of 3-4
weeks. Shoreline Exemptions are not subject to any application fees. All fees are subject to
change. Detailed information regarding the land use application submittal can be found on the
City’s website by clicking “Land Use Applications” on the Community & Economic Development
page, then “All Forms (A to Z).” The City now requires electronic plan submittal for all
applications.
Public Notice: A minimum of one Public Information Sign is required for a Shoreline Substantial
Development Permit application. The applicant is responsible for the procurement, installation
and maintenance of the sign. Detailed information regarding the land use application submittal
requirements is provided on the City of Renton website (www.rentonwa.gov).
Next Steps: When the formal application materials are complete, the applicant is required to
have the application materials pre-screened prior to submitting the complete application
package. Please contact Jill Ding, Senior Planner at jding@rentonwa.gov.
Expiration: The Shoreline Substantial Development Permit or Shoreline Exemption is valid for
two (2) years of the date of approval.