HomeMy WebLinkAboutLUA80-129 July 29, 1982
OFFICE OF THE LAND USE HEARING EXAMINER
CITY OF RENTON
REPORT AND RECOMMENDATION TO THE RENTON CITY COUNCIL.
APPLICANT: Alterra Corporation FILE NO. R-129-80
LOCATION: North of S.W. 7th Street, east of the proposed P-1 Channel , south
of the old Chicago Milwaukee St. Paul Railroad right-of-way,, and
west of the extension of Thomas Avenue S.W.
SUMMARY OF REQUEST: The applicant seeks a rezone of the subject site from G-1 to M-P
for future warehouse and office use.
SUMMARY OF Building & Zoning Department: Dismissal without prejudice.
RECOMMENDATION:
Hearing Examiner: Approval subject to conditions and covenants.
BUILDING & ZONING The Building & Zoning Department report was received by the
DEPARTMENT REPORT: Examiner on June 8, 1982.
PUBLIC HEARING: After reviewing the Building & Zoning Department report,
examining available information on file with the application,
and field checking the property and surrounding area, the
Examiner conducted a public hearing on the subject as follows:
The hearing was opened on June 15, 1982 at 9:00 a.m. in the Council Chambers of the
Renton Municipal Building. Parties wishing to testify were affirmed by the Examiner.
Roger Blaylock, Zoning Administrator, presented the Building & Zoning Department report,
and entered the following exhibits into the record:
Exhibit #1 : Application File containing Building & Zoning
Department report, draft and final EISs , and
other pertinent documents
Exhibit #2: Conceptual Land Use Preservation Plan
Exhibit 113: Site Plan indicating ERC conditions
Aerial Photograph for subject area (illustrative purposes)
Responding to the Examiner's inquiry regarding uses located north of the subject site,
Mr. Blaylock advised that the railroad right-of-way and a vacant parcel are located to
the north. He also indicated that the dedication areas denoted in Sections L.4.b and c.
of the staff report should be corrected to 3.9 acres. Responding to the Examiner's
inquiry regarding whether the Building & Zoning Department is recommending denial
rather than dismissal without prejudice of the matter, David Clemens, Policy Development
Director, stated that a recommendation of denial would have precluded reapplication of
the rezone within a period of one year.
The Examiner requested testimony by the applicant. Responding was: i.
Joel 'Haggard
1700 Daon Building
720 Olive Way
Seattle, WA 98101
Mr. Haggard, legal counsel for the applicant, advised that one of the applicant's expert
witnesses, Richard Carothers , landscape architect, was unable to attend the hearing due
to another commitment, and a continuance would be requested if warranted. Referencing
an appeal filed by Mr. Haggard on June 10, 1982 of certain conditions imposed by the
Environmental Review Committee, Mr. Haggard requested that Conditions No. 1 and 2 be
reviewed this date. The Examiner indicated thatialthough the appeal had been received
prior to the scheduled hearing, there' had been insufficient time to publish legal
notice of the appeal ; however, to expedite testimony for citizens in attendance as well
as the applicant's expert witnesses , certain testimony regarding the rezone could be
incorporated into the record of the appeal when it is scheduled for hearing.
Mr. Haggard called his first witness. Responding was:
Delton Bonds •
P.O. Box 66101
Seattle, WA 98166
t •
R-129-80 Page Two
Mr. Bonds, one of the owners of the property, indicated that purchase had been predicated '
upon the Manufacturing Park designation of the subject site on the Comprehensive Plan,
and disregarding the current economy, the request for rezone had been submitted to
accommodate future needs in the community. He discussed development plans which have
been proposed and discussed with city staff which include measures for retention of
trees, limitation of gross size of buildings, elimination of western access to the site;
and donations for P-1 Channel and wildlife habitat.
Responding to staff comments in the report concerning a current surplus of Manufacturing
Park zoned property in the city, Mr. Bonds advised that the majority of that property is
owned by a sole property owner who chooses not to develop at this time due to high
interest rates. Because a time frame of from two to two and one-half years is required
from commencement of a large development to completion, approval of the subject request
will allow proceeding with the project to provide additional space to meet needs which
will be evident in the near future. Mr. Bonds submitted a 'graph which denotes issuance
of industrial building permits in the City of Renton from 1975 through 1980 to illustrate
his point. The graph was entered into the record as follows:
Exhibit #4: Issuance of Industrial Building Permits
in City of Renton
Responding for the applicant was:
David Markley
Transpo Group
23-148th Avenue S.E.
Bellevue, WA 98007
Mr. Markley was affirmed by the Examiner, who accepted and entered his resume into the
record as follows:
Exhibit #5: Resume for David Markley
Mr. Markley, partner in the Transpo Group, an engineering and traffic consulting firm,
advised meeting with the Public Works Director and Traffic Engineer of the city to
discuss the EIS for the subject proposal , and it was determined that the document should
address the overall traffic impacts of the range of possible developments , with an in-
depth traffic operational study required upon submission of a specific proposal to define
problem areas and provide mitigation measures. A letter from the Public Works Director
confirming this matter was submitted into the record as follows:
Exhibit #6: Letter from R. Houghton to David Clemens ,
dated August 7, 1981
Mr. Markley described the process of comparison in determining that the revised proposal
falls within the limits of the o'riginal proposal in comparing square footage of building
areas of both proposals as well as total trip generation. Both ranges, he noted, fall
within the limits denoted in the EIS analysis. The revised site plan does not propose
a connection to Monster Road, and traffic would utilize the south or east accesses to
and from destinations. At the time' specific building plans are developed, critical areas
to be specifically analyzed would be defined by 1-405 on the south, Sunset Boulevard S.W.
on the north, Rainier Avenue on the east and the West Valley Highway on the west.
Referencing Attachment D of the EIS the Examiner asked Mr. Markley if he still believed
that even with mitigation measures denoted on the attachment, traffic flbw in the area
will not be improved or maintained, and any new development will have adverse impacts.
Mr. Markley responded affirmatively. The Examiner inquired if, i;n Mr. Markley's opinion,
elimination of the westerly access to Monster Road would exacerbate traffic impacts in the
area more or less than stated in the draft EIS. Mr. Markley advised that although traffic
would be aggravated it would not be more so than predicted to occur in the final EIS. The ,
Examiner inquired if development other than office park would have a greater impact on
roads, noting that a warehouse use would have less employees, thereby reducing the number
of vehicles accessing the site. Mr. Markley agreed that a mix of uses would have varying
impacts. Mr. Haggard asked Mr. Markley a series of questions regarding trips generated
from warehouse and office uses based on the ITE Trip Generation Manual . Mr. Markley
stated that 21 trips would be generated per 1 ,000 square feet of office spate with six trips
per 1 ,000 square feet of warehouse space, and figures denoted in the EIS reflect 100% office
use for the maximum number of trips and 60% for the low figure. Mr. Clemens inquired
regarding Mr. Markley's definition of light warehousing in terms of rail-served projects .
Mr. Markley stated that non-rail use of six trips per 1 ,000 square feet had been denoted
in EIS figures , but rail-served use would decrease trips to five per 1 ,000. Mr. Haggard
inquired if Mr. Markley concurred in Mr. Blaylock's statement that approval of the rezone
itself will have no environmental impact but development that follows will have impact.
Mr. Markley concurred.
An explanation ofthe recommendation of the ERC to maintain a water surface elevation of
R-129-80 Page Three
17. 1 feet was requested by Mr. Haggard: Mr. Clemens stated that the ERC had reviewed
all analyses and concluded that the appropriate level of flood safety applied to the
general vicinity of the site was a future condition for future development of the
drainage basin, and the 100 year flood surface elevation is 17. 1 feet with 400 cfs maximum.
As a result of that finding, the committee concurred in the requirements of the county that
flood storage to that elevation should be provided. Responding to Mr. Haggard's request
that the hydrology expert from the ERC, Richard Houghton, Public Works Director, respond
to his questioning, the Examiner requested that since a full appeal hearing is not
currently being held, Mr. Haggard should not proceed with that line of questioning.
Although Mr. Haggard felt the questioning was relevant, he reserved further questions
for Mr. Houghton. The Examiner advised that Mr. Haggard may make his case as far as the
100 year flood storage elevation which is independent of the ERC condition.
Responding to Mr. Haggard's questioning regarding the appropriate time for evaluation of
impacts from a proposal , Mr. Clemens. stated that SEPA suggests that those impacts should
be evaluated at :;,the earliest possible stage, which in this case would be the time of
rezone review. 'Responding to further questioning by Mr. Haggard, Mr. Clemens acknowledged
that the City Council has made a determination that the land use of the property should
be manufacturing park, that when a manufacturing park is proposed for development, a
permit application will be made to the city, and review of the application will include
additional studies pertaining to flood control and traffic. Mr. Clemens also concurred
that FEMA reviews present conditions in establishing the 100 year flood plain elevation,
and the subject application is the first in which the city had based the 100 year flood
storage upon a 17 foot elevation. ,:
Following a recess from 10:24 a.m. to 10:38 a.m. , Mr. Haggard called his next witness.
Responding was:
Gerald Rasmussen
Senior Project Engineer
ENTRANCO
1515 116th Avenue N.E.
Bellevue, WA 98004
Mr. Rasmussen reviewed his educational and professional background. Responding to Mr.
Haggard's questioning, he advised that. the elevation for the 100 year flood plain in the
past has been 15 feet. It is FEMA's responsibility to review only the present elevation
of development and not future elevations , and the discharge rate of 23 hours or until the
Auburn guage reaches 12,000 cfs of unlimited pumping followed by 400 cfs discharge, a
condition reviewed and examined by several hydrologists, is the estimated travel time of
a release from Howard Hanson Dam to reach the Black River. Mr. Rasmussen also advised
that since 1962, the Auburn guage at the Green River has reached 12,000 cfs only once
(1976) . Following review and description of a three page listing of annual peak discharges
of the Green River by Mr. Rasmussen, the Examiner entered it into the record as follows:
Exhibit #7: Annual Peak Discharge of Green
River from 1936 to 1976
Mr. Rasmussen described the procedure utilized by King County in the operation of the
pump station for unlimited pumping for 22.5 hours and then 400 cfs discharge beyond
that period of time. In actual practice, When a storm is occurring in the area a
watch is maintained both by the county and the Corp of Engineers to allow operation of the
pump station on the basis of levee safety. Very frequently., the 12,000 cfs and the 400
cfs maximum can be exceeded if the levee so permits. The Examiner inquired regarding
specifics of the occurrence in 1976 when the Green River reached 12,000 cfs and whether
flood conditions were occurring upstream from the pumping station. Although Mr. Rasmussen
was uncertain of specifics, he stated that the 400 cfs limitation was not in existence
in 1976, but was a concession obtained from the Corp of Engineers in recent years.
Responding to Mr. Haggard's inquiry, Mr. Rasmussen indicated that unlimited discharge at
the pump station to the river is desired because storage inundates the land behind the
Black River pump station and reserve capacity is lost.
Responding to Mr. Haggard 's question regarding the appropriateness of the King County
procedure for operation of the pump station, Mr. Rasmussen stated his opinion that it
is appropriate since it is based on actual occurrences in the field. He cited occurrence
of a heavy storm in October of 1981 , approaching 100 years ; however, due to prior dry
conditions in the area, the Green River was very low, it had unlimited pumping, and a'
severe condition did not occur. He indicated that 400 cfs maximum discharge is a, very
conservative limitation, and two factors, the intensity of the storm and the:existing
conditions affect the pumping capacity, and the percentage of both of those factors
occurring simultaneously has a lesser frequency than a 100 year period.
Mr. Haggard inquired if any of the operating scenarios, either full storage, limiting
discharge for all time, or operating in accordance with King County procedures of
unlimited pumping for 22 hours followed by 400 cfs maximum and levee watching were •
r t
4
R--..,-80 Page Four `.
recommended specifically by Mr. Rasmussen in his report. Mr. Rasmussen indicated that
no selection had been made; however, the ERC had determined that none of the recommendations
would be followed. Responding to Mr. Haggard's inquiry regarding Mr. Rasmussen's
recommended scenario, Mr. Rasmussen advised his choice of the three would be the procedure
followed by King County, which would have a frequency of less than one percent or a return
greater than 100%.
Mr. Haggard asked Mr.- Rasmussen to confirm that the one condition selected ,by the ERC
assumes future conditions; however, the future FEMA study which prompted the ERC's
recommendation for dismissal will not consider future conditions. Also, although the
ERC assumes that the P-1 Channel will not be constructed, the applicant has volunteered
a dedication of P-1 Channel property. Mr. Rasmussen confirmed Mr. Haggard's statements.
Responding to the Examiner's inquiry, Mr. Rasmussen described the differences which will
occur with or without the channel , noting that the channel will modify the hydrograph,
time water flow, and expedite the water to the dam faster than would a meandering route,
and would have a benefit in confining the water within channel boundaries. Without the
channel , waters will overflow the banks and flood the lands adjacent to the river in Kent
and Orillia upstream from the Black River pump station.
Cross-examination and response then occurred between Mr. Haggard and Mr. Rasmussen regarding
the timing for providing compensating storage for the 100 year flood plain, and whether a
flood level requires specification at the rezone stage. It was determined that since no
development is occurring as a result of a change in zoning classification of the property,
the level for compensating storage should be established when development plans are
submitted. The Examiner inquired regarding computations of the holding capacity of
vegetation on site to retain water during a 100 year storm to allow determination of
whether removal of that vegetation would have an impact. Mr. Rasmussen felt the amount
would be minimal , particularly during the flood season, but vegetation would hold some
water during the growing season.
Cross-examination then occurred between Mr. Clemens and Mr. Rasmussen, and it was
determined that the significant information contained in Exhibit #7 is limited to data
collected after 1962; that dedication of P-1 property by the applicants will not assure
that the P-1 Channel will be constructed; that other costs are associated with channel
construction besides the acquisition of property; and the Corp of Engineers within the
past six weeks has withdrawn its permission for downstream pump stations to pump into
the Green River, and as a result, the county is reevaluating its ability to discharge
into that river north of the Auburn guage, although, the informal agreement had been
more of a privilege than a contractual right.
The Examiner inquired regarding the effect that water immediately pumped out to the Green
River instead of retained on site would have on ground water recharge, Springbrook Creek;,
and the rest of the wetlands. Mr. Rasmussen advised that the pump station is operated
in such a manner that Springbrook Creek and other drainages in that area would not be
adversely affected other than during storm conditions. The Examiner inquired regarding
the effect on wetlands if no slow water recharge occurs from the 70 acre site if all water
on site is immediately discharged. Mr. Rasmussen stated that all water is not immediately
pumped out except during storm periods when water is emptied from the site to provide
available storage for replacement.
Referencing Section L.4.b. of the staff report which denotes a condition imposed by the
ERC to dedicate a 3.9 acre area in perpetuity for wildlife and natural vegetation
mitigation purposes, Mr. Haggard questioned Mr. Clemens regarding revisions 'in location
of the dedicated area denoted on Exhibits #2 and #3. After lengthy discussion, it was
determined that the specific item should be continued until the applicant's representative,
Mr. Richard Carothers, can attend to testify on his own behalf. Also responding on the
subject was:
Tom Gessford
814 E. Pike
Seattle, WA 98122
Mr. Gessford, landscape architect for Richard Carothers , described his role in preparation
of graphics for the subject proposal , explaining methods and rationale for revision of
exhibits following submission to the city. He also discussed field trips to the site
during which certain large trees were identified from a distance as satisfactory in
condition.
The Examiner requested testimony in support of the application. Responding was:
Loren Davis
1818 Westlake N. , Suite 308
Seattle, WA 98109
Mr. Davis , representative of Holvick •deRegt Koering , adjacent property owner to the
south, advised working closely with the applicant for a period of time to resolve the
' c�s R-147=80 Page Five
flood hazard issue involving both sites. Due to constraints imposed on the P-1 Channel
to which the city is unable to respond, it was his opinion that construction of the P-1
Channel is unlikely. Therefore, in cooperation with ENTRANCO engineering firm, the city,
and the applicant, an alternative has been developed to resolve the flood hazard issue
based on providing compensating storage for the 100 year flood elevation. He supported
the applicant's design criteria which are limited to current conditions in accordance
with expert testimony on the flood storage issue provided by the applicant's representative.
Responding to Mr. Haggard's inquiry, ,Mr. Davis reviewed his civil engineering educational
and professional background.
The Examiner requested testimony in opposition to the proposal . Responding was:
Carol Stoner
19708 121st Avenue S.E.
Renton, WA 98055
Ms. Stoner was affirmed by the Examiner. She advised that she is speaking on behalf of
the Green River Study Group, which submitted a letter of response upon publication of the
draft EIS. Referencing the applicant's revised site plan, she indicated concern that
large trees in the riparian forest, a unique habitat in the area, are not included in
the area designated for preservation. Referencing the Renton Wetlands Study, she noted
that the Black River Forest was the most highly rated habitat evaluated, and the study
recommended a preservation of at least 40 acres to keep the habitat intact. Ms. Stoner
recommended preservation of the area around the SCS forebay area to buffer the public
from birds and wildlife utilizing that area. She also indicated concern regarding the
effect of immediate discharge from the property on the water quality of the Green River,
noting that if the area becomes urbanized, urban pollution will become a factor.
The Examiner requested further testimony. Mr. Haggard requested a continuance for the
sole purpose of receiving testimony from Mr. Richard Carothers. The Examiner concurred
in the request, and the hearing was continued for purposes of limited testimony to
July 13, 1982 at 9:00 a.m. Time: 12: 15 p.m.
CONTINUATION:
The continued hearing was reopened on July 13, 1982 at. 9:05 a.m. in the Council Chambers
of the Renton Municipal Building. Parties wishing to testify were affirmed by the Examiner.
Roger Blaylock, Zoning Administrator, summarized the previous hearing, noting his wish
to reserve the opportunity for final ' recommendation at conclusion of testimony.
Joel Haggard, legal counsel for the applicant, advised submission of a supplemental
memorandum, which was received by the Examiner on July, 12, 1982. The memorandum was
entered as follows:
Exhibit #8: Supplemental Memorandum, July 12, 1982
Also submitted in lieu of a previous landscape guideline submission was a revised version,
prepared by Richard Carothers Associates. The Exami-ner entered the document along with an
additional submission into the record as follows:
Exhibit #9: Modified Landscape Plan
Exhibit #10: Letter to Hearing Examiner from Carol Stoner,
July 13, 1982, regarding Black River Forest
Mr. Haggard requested testimony by the applicant's landscape architect. Responding was:
Richard Carothers
Richard Carothers Associates
814 E. Pike
Seattle, WA 98122
Mr. Carothers briefly reviewed his educational and professional background, and entered
a resume into the record:
Exhibit #11 : Resume for Richard Carothers
A brief site evaluation chronology was presented by Mr. Carothers , who described broad
scale environmental conditions in existence on the property. He advised that the climax
riparian forest is at the end of its life span since it is no longer restoring itself with
revegetation of cottonwood, ash and alder trees. Responding to the Examiner's inquiry
regarding the ultimate result if the site is left in• its natural state, Mr. Carothers
advised that only the alder will reseed itself. He described the change in hydrology on
the site since the early 1900's when the property was a back water of Lake Washington;
R-129-80 Page Six
however, at the present time, most of the water on site is flood plain residual .
Addressing the matter of wildlife habitat, Mr. Carothers reviewed conditions which attract
wildlife, noting his opinion that the Black River Forest is a relatively poor habitat
for both birds and small mammals except rodents such as mountain beaver and rats, although
the fringes of the site do provide habitat for birds. Evaluation of the site for
recreational purposes and a nature preserve had occurred; however, the wetland character ,
of the land precludes recreational use, and a nature preserve would not be suitable due
to brittle nature of cottonwoods in the climax forest and lack of potential for appropriate
vegetation to encourage that use.
Development potential had been evaluated, and a determination made that the site was
suitable for development due to several factors including surrounding existing M-P zoning,
designation in the Green River Comprehensive Plan, and previous rezoning of other sites
surrounding the subject property to designations in conformance to the Comprehensive Plan.
Mr. Carothers described the process of developing a site sensitive to both the preserve
area and development, and the original concept set aside approximately 28 acres or
approximately 40% of the property for preserve areas. However, following a compromise
reached with the owner, a preserve area containing approximately 19 acres was agreed
upon, that area designated to remain in a relatively large single expanse, a concept
which allowed maximum flexibility for development while still preserving the large area
adjacent to the P-1 Channel area should it be constructed.
Responding to Mr. Haggard's inquiry regarding discrepancies in numbers on Exhibits #2 and
#3 and whether Mr. Carothers has had an opportunity to review the location of large trees
and their size, Mr. Carothers advised that a survey had been performed since the last
hearing which confirms the numbers of large, specimen trees and their location on the
site. He submitted the survey which was entered into the record as follows:
Exhibit #12: Map of Tree Inventory in area of
concern and Revised Plan
Using a green marking pen, Mr. Carothers designated on Exhibit #12 the redefinition of
boundaries of areas vegetated with large trees which should be preserved through development,
amounting to just less than 20 acres in size. He noted that certain large trees located
in areas for development may be retained if determined feasible by a plant pathologist or
arborist, by development of wells around the trees to maintain ground water for survival .
Mr. Clemens asked Mr. Carothers to describe specific considerations in reducing his
original proposal from 28 to 20 acres. Mr. Carothers advised that the reduction had
occurred through achieving a reasonable balance between areas of preserve and areas of
development. Discussion ensued between Mr. Clemens and Mr. Carothers regarding
preservation of the west end of the site and areas adjacent to railroad tracks which
contain relatively few trees. Mr. Carothers advised that as a result of the tree survey,
boundaries were established to preserve large groupings of trees and show a debarkation
line between the preserve and proposed development. Following further discussion regarding:
possible plans to clear and thin the preserve zones and intersperse a variety of' plant
materials in that area should trees die out as well as protection of small stands of trees
from prevailing winds, Mr. Carothers advised his recommendation for review of these
matters oy an arborist during site development. -
Responding to Mr. Haggard's questioning, Mr. Carothers described the broad base landscape
guidelines for the project which will enhance the environmental quality of the development,
and advised that corrections to Exhibit #9 to reflect modifications illustrated on
Exhibit #12 will be submitted later. He also noted that although the western end of the
subject site contains little vegetation, it is designated to be preserved because a
roadway cannot be constructed to that area due to its potential impact to the environmental
quality of the central preserve area and effect to water supply. Therefore, use of that
portion for site development i.s not feasible. Mr. Haggard inquired which of the three
plans, Exhibit #2, #3 or #12 would reflect Mr. Carothers' recommendation. Mr. Carothers
stated that #12 reflects his recommendation subject to conditions of the landscape
guidelines and subject to the tree well concept discussed above.
The Examiner noted that the name of the development, Black River Office Park, indicates
a proposed business use rather than manufacturing park, and he inquired why B-1 zoning
had not been requested. Mr. Haggard described the concept of providing warehousing along
the north boundary and constructing offices in the interior; however, the office concept
will be industrially related, and the requested zoning conforms to the Comprehensive
Plan designation for the subject site. Responding to the Examiner's comment that the
Comprehensive Plan is not a binding document, Mr. Haggard submitted RCW 35A•63.080 into
the record, which rules that although the Comprehensive Plan shall serve as a basic source
of reference for future legislative and administrative action, it shall not be construed
as a regulation of property rights or land uses. - -
Based upon testimony previously heard, Mr. Blaylock modified the staff recommendation to
R-1zg-80 Page Seven
conform to specifics denoted on Exhibit #12 with the condition that specific areas
• proposed to be dedicated to the SCS and City of Renton and all preserve areas will be
excluded from the rezone to M-P. Additionally, Exhibit #9 contains minimum design
criteria; therefore, site plan analysis and approval shall also be required prior to
development. Responding to the revised recommendation, Mr. Haggard requested a brief
recess to allow review of the proposal with his clients. The hearing was continued at
10:20 a.m. and reconvened at 10:33 a.m.
Responding to Mr. Blaylock's recommendation, Mr. Haggard indicated concern that 28% of
the total site would not be included lin a calculation of development potential by
exclusion from the rezone request. He suggested instead that the entire site be rezoned
to M-P and a restriction placed on the title which states that areas designated in green
on Exhibit #12 should be preserved with two, conditions : 1) that legal descriptions be
submitted for preserve boundaries; and 2) that structures related to the functioning
processes of flood storage or storm water control could be constructed in the areas
designated in green on Exhibit #12. He suggested that the dedication of the SCS area
to the city for the P-1 Channel area could occur with a restriction in the transfer that
the area could be used for the benefit of the entire property for flood storage if the
P-1 Channel project does not proceed. He summarized the applicant's recommendations for
rezone of the entire site to M-P subject to all conditions contained .in the applicant's
letter of May 25, 1982 except for No. 14 as modified by the letter of June 10, 1982;
subject to landscape guidelines in Exhibit #9 except as modified by Exhibit #12 and
i supplemented with additional tree retention material ; and subject to conditions that a
non-building restriction may be placed on all green ares identified on Exhibit #12 and
that the applicant deed to the City of Renton the area identified as SCS on Exhibit #12
subject to utilization by the applicant for flood control .
Mr. Clemens concurred with the applicant's recommendations to the extent that the areas
designated CR or P or preserve area be dedicated as open space easements to the city
prior to adoption of the rezone with the underlying title, to remain with the property
owner. Mr. Haggard indicated concern with legal implications if a non-building
restriction is placed on the title that development potential has been lost for the 28%
of site acreage. Mr. Clemens felt that restrictive covenants do not work and become
confused over a period of time resulting in a loss of original intent, and preferred
dedication of an easement. Mr. Haggard asked if development rights for the dedication
areas could be reserved for transfer of the property subject to the applicant's Condition
No. 1 which establishes a maximum upper limit on the total development of the property.
Mr. Clemens concurred. He also suggested' that the testimony of the rezone hearing be
incorporated by reference into the appeal hearing to follow. The record was so entered
by the Examiner.
Responding to the Examiner's request for additional time in which to publish .a
recommendation regarding the matter, Mr. Haggard waived the two week requirement. Since
there were no further comments offered, the hearing regarding File No. R-129-80 was
closed by the Examiner at 10:50 a.m.
FINDINGS, CONCLUSIONS & RECOMMENDATIONS: Having reviewed the record in this matter, the
Examiner now makes and enters the following:
FINDINGS:
1 . The applicant, Alterra Corporation, filed a request for approval of a reclassification
of approximately 71 acres of property from G-1 (General ; Single Family Residential ;
Minimum lot size - 35,000 square feet) to M-P (Manufacturing Park) .
2. The application file containing the application, SEPA documentation, the Building
and Zoning Department report, and other pertinent documents was entered into the
record as Exhibit #1 .
3. Pursuant to the City of Renton's Environmental Ordinance and the State Environmental
Policy Act of 1971 , RCW 43.21C, as amended, draft and final Environmental Impact
Statements were prepared for the subject proposal .
4. Plans for the proposal have been reviewed by all city departments affected by the
impact of this development.
5. The subject site is located south of the Chicago-Milwaukee-St. Paul Railroad right-
of-way, generally north of the Black River Channel ; and west of Thomas Avenue S.W.
(extended) .
6. The subject site was annexed into the city by Ordinance No. 1745 in April of 1959 at
which time the current zoning classification was applied.
7. The subject site is generally level although in the generally northwest area, fill
material has been incorporated into the site as part of the railroad right-of-way.
R-129-80 Page Eight
The site slopes downward to the south very slightly.
The elevations of the site vary and some filling will be required to bring portions
of the site above the 100 year flood plain.
The 100 year flood level used by FEMA had been approximately 15 feet. The ERC
imposed a level of approximately 17 feet which was subsequently modified and will
be based on FEMA calculations. .FEMA 'uses the current level of development to
calculate the flood elevation and does not forecast future development or its impacts
on flood waters. As more property is developed there are more structures with the
potential to displace flood water. , There is also a corresponding loss of permeability
by covering soils with buildings and asphalt paving which results in further loss of ,
water holding capacity. The city requires on-site retention/detention of storm water.
The applicant's expert indicated•,that a conservative range for the 100 year flood
would be about 15.0 feet to 17.0 feet.
While the Army Corp of Engineers (Corp) presently permits pumping from the Black
River's tributaries into the Green River, they have indicated that this verbal
agreement is not binding' and may be subject to modifications. During flood stage the
areas of the Black's tributaries' .closest to the City would pump water into the Green
prior to the flood waters of the Green itself reaching. the area of the pump station.
Approximately 22- hours of lead time is available for this operation.
8. The site contains about 40 acres of unique forest area consisting of wetlands and old
growth riparian forest. . The water table is at or near the surface of portions of the
site during most of the year. The holding capacity of the site is high while the
erosion hazard is slight. The environmental impact statement prepared for the site
gives an extensive hydrological and vegetational analysis of the site.
The forest is one of the last remaining riparian forests in the Seattle area. The
trees consist of ash, willow, alder and cottonwood. The understory is very thick and
contains blackberry bushes and grasses.
9. The subject site is located immediately north of the proposed forebay for the flood
control channel (P-1) and portions of said channel are located within the boundaries
of the subject site. The applicant has consented to convey those portions of the
previously designed channel within its boundaries subject to credit for both flood
water storage capacity and land development acreage equivalencies.
The applicant would have to provide on-site retention of storm water which would '
otherwise be displaced by development of the site. The dedication of land for the
channel would prevent development of that land, and thereby Prevent displacement of
any storm water as to that land. The enlarging of the channel to greater widths and
depths would accommodate even greater amounts of water, which the applicant wants
credit for storing. This credit would then allow a certain amount of water displacement
from other portions of the subject site. . .,
The hundred year flood level is subject to further analysis by the Federal Emergency
Management Agency (FEMA) . The applicant agreed to provide compensating flood storage
capacity equivalent to the elevation determined by that agency. The amount of property,
involved in the Channel is approximately nine acres. The exact amount of property and
the boundaries would be ascertained subsequent to a survey.
10. The vegetation comprising .the riparian forest provides wildlife habitat, and a unique
wetland environment. The forest also provides visual relief from the relatively flat
flood plain, and the greenbelt forest area also helps retain water and cool the water
by providing shade trees over the channel .
The wetlands cleanse the..water of, sediment by providing wetland treatment to storm
waters. The water current slows upon entry into the wetland area and sediments are
both deposited due to the change in speed and filtered by wetland vegetation.
Contaminants are also cleansed by the wetland treatment, a biophysical action which
allows breakdown of contaminants. The wetlands also act as a sponge retaining large
volumes' of storm water and slowly releasing them after precipitation has ceased. The
wetlands store water from the wet periods and release them over the dryer summer months
providing a more or less continuous flow of water to the area and thereby retaining the
wetland,;,environment year round.
11 . The areas of significant vegetation were in contention because of the definition of
"significant." While either large trees or unique trees for the region, i .e. hardwoods ,
could qualify,, the larger trees may actually be nearing the end of their lifespan.
Significant ,trees, either singly or in stands, have been identified under both criteria,
size and/or type. The applicant has indicated that larger areas containing probably
about nine acres plus additional separate trees would be preserved per Exhibit #12.
R-129-80 Page Nine
The total preservation acreage, while not precise until legal descriptions and surveys
are completed, would be approximately 11 acres. This would include the areas at the
extreme western end of the site which would be more open space in nature and less
forested. The larger stand adjacent to the channel: would withstand wind damage more
readily and there would be little or no alteration of their environment. The separate
isolated stands may succumb to wind damage or development pressures. The applicant has
indicated that protective measures such as creating tree wells surrounding the trees
would be taken per the recommendation contained within Exhibit #12.
12. The applicant proposes developing in excess of 900,000 square feet of gross square
footage on the property depending on the parking requirements which may be associated
with one or more of the possible uses. The applicant indicated a maximum figure of
995,781 .5 square feet would be developed on the subject site.
13. The number of employees would be dependent upon and proportional to the square footage.
The estimate of the number of permanent employees would be approximately 4,105. Many
of these employees would come from outside the city boundaries.
14. Again, the square footage and mix of uses would determine the number of vehicle trips
per day attracted to the subject site and generated by the development of the subject
site. The number of trips range from a low of approximately 9,070 trips to a high of
approximately 34,030 trips. Peak hour trips would range from 1 ,250 to 3,970 trips for
the afternoon/evening rush hour.
The major access to the subject site is to the south, through the Washington Technical
Plat, via Powell Avenue S.W. There is planned connection to the west via a bridge
across the P-1 Channel to Monster Road. The Monster Road connection, if constructed,
will not be implemented until Phase II of the Washington Technical Park development
occurs.
Phase I traffic will , therefore, use the southern access via intersections which are
already functioning at capacity. The critical intersections are located between 1-405
on the south and Sunset Boulevard S.W. on the north, and Rainier Avenue S. on the east
and the West Valley Highway on the west. While the EIS indicates that alternative
routes would be used, in this area of the city there is only limited opportunity for
such route selection. Increased reliance upon alternative modes such as car pools and
van pools and Metro transit may hold some potential for alleviating the capacity
problems at the intersections.
The immediate impact will be adverse and probably cause a prolonged peak hour at many
of the intersections. The peak hour which is a term which reflects the peak period
and is not confined to one single chronological hour, may well extend beyond an hour.
Such an increase will occur with the expanding development in the southwest quadrant
of the city.
South of the subject site and south of 1-405 is a large M-P zone which is part of
the Orillia Industrial Park of Burlington Northern. There are approximately 458 acres
of undeveloped M-P property. Burlington Northern is preserving this acreage for
potential rail users.
The M-P zoning of; the Washington Technical Park consists of approximately 109 acres .
Development is just beginning on these lands. Other properties in the. valley are
owned by individual companies and will be developed for their specific needs.
15. The subject site has about three miles of rail .lines and would be capable of providing
rail service to tenants. Major access routes near the site are 1-405, the East and West
Valley Highways, and Rainier Avenue S.
16. The Comprehensive Plan designates the area in which the subject site is located as
suitable for the development of manufacturing park uses.
CONCLUSIONS:
1 . The proponent of a rezone must demonstrate the the request is in the public interest
and will not impair the public health, safety and welfare. In addition, the rezone
must comply with at least one of the three criteria listed in Section 4-3014 which
provides in part that:
a. The subject site has not been considered in a previous area rezone or land
use analysis; or
b. The subject site is potentially designated for the new classification per the
Comprehensive Plan; or '
R-129-80 Page Ten
c. There has been material and substantial change in the circumstances in the area
in which the subject site is located since the last rezoning of the property or
area.
The applicant has demonstrated that the subject site should be reclassified to M-P
subject to the conditions indicated below.
2. The subject site abuts railroad right-of-way and would be imminently suitable for
rail-served warehousing.
3. The area in which the subject site is located has become a focal point for manufacturing
park uses , especially south and east of the subject site. The classification would be
compatible with the Comprehensive Plan.
4. While access to and from the subject site during peak hours may be difficult and
reclassifying the subject site will exacerbate an already critical traffic situation,
the site is ideally located with reference to major highway and arterial routes , such
as the East and West Valley Highways , 1-405 and Rainier and Lind Avenue during off
peak hours.
Alternative modes of transportation would be expected to accomplish some diminution
of traffic, and the eventual opening of a connection to Monster Road will permit
traffic to avoid the Grady Way/Rainier corridors.
5. While there is a question of the timeliness of the conversion of this property to M-P
in light of the more than 600 acres of land already zoned M-P south of the site which
has not been developed, much of that land is in the ownership of Burlington Northern
and is not available to other private, independent developers.
6. The agreement by the applicant to dedicate certain portions of the subject site for
both flood control and greenbelt will preserve portions of the riparian forest along
with wetland habitat. The applicant will also be able to make reasonable use of the
remainder of the subject site.
7. In order to maintain the natural and open space quality of the main preserve area
which is that area confined to the contiguous lands and includes the channel area and '
the lands immediately adjacent to it as generally shown on Exhibit #12, the applicant
should dedicate those lands to the city to be used for greenbelt and open space. The
conveyance should include covenants which prohibit the development or placement of any
structures on those lands with the exception of flood control structures which may be
placed in and upon the lands generally defined as the P-1 Channel . The covenants
should also indicate that the donee has received development credit for the acreage
and the land must remain perpetually undeveloped.
The remaining preserve, that is , the small pockets of significant trees indicated
upon Exhibit #12 shall be protedted by the execution of restrictive dovenants requiring
the preservation by appropriate means Which are indicated generally by the criteria
found in Exhibit #9 and subject to the approval of the city's landscape architect with
the proviso that approximately 5 square feet of land is necessary for each capiper
inch as indicated by testimony at the public hearing.
8. In order to secure to the applicant reasonable use of the entire property and preserves
the development benefit of the dedicated and restricted property identified above,
the applicant should receive pro rata credit for such acreage. , Such credit should be ;
applied to the remaining acreage or to each lot created by a subsequent subdivision on'
a pro rata basis. That.. is, the 51 or so remaining acres should be treated for
development purposes as 71 acres subject to the 995,781 .5 square foot maximum and
other regulations of the city.
9. The applicant's dedication of the areas designated for the P-1 Channel or counterpart
should be acknowledged and the applicant granted flood storage capacity credit to be
utilized upon the remaining acreage. This figure will have to be derived from
calculations based upon analysis by FEMA of the one hundred year flood level and further
calculations of the amount of credit which would be created by the dedication and
eventual construction of some form of flood control channel . The applicant's
hydrologist indicated that hydrology is not an exact science and therefore the
calculations will approach a best estimate which should be based upon reasonable
engineering standards erring on the side of caution.
10. The elevation at which the property will have to be developed to ensure flood
proofing will be determined by the FEMA studies, but until that information is
available the city and the applicant will lack any basis for determining the base
elevation 'for construction. Similarly, the land dedicated for the channel may not
provide the full measure of equivalent storage capacity to that lost by development
Kr
R-129-80 Page Eleven
on the site, and this will also be determined by further analysis.
The applicant will have to provide equivalent storage capacity to that lost to
development if such loss is greater than the capacity of the P-1 Channel acreage.
11 . The applicant should develop the land in accordance with the landscape concepts
submitted in Exhibit#9.
12. The applicant has presented landscape concept plans which, supplemented by the
dedication of open space and the provision of flood control acreage, appear to
• benefit the public. Therefore;, the City Council should approve the request which
is compatible with the goals and policies of the Comprehensive Plan and reclassify
the property to M-P.
RECOMMENDATION:
The City Council should reclassify, the subject site from G-1 to M-P subject to the
execution of an agreement implementing the conditions outlined in the above conclusions.
ORDERED THIS 29th day of July, 1982.
Fred J. K fman
Land Use aring Examiner
TRANSMITTED THIS 29th day of July, 1982 by Affidavit of Mailing to the parties
of record:
Joel Haggard, 1700 Daon Building, 720 Olive Way, Seattle
WA 98101
Delton Bonds, P.O. Box 66101 , Seattle, WA 98166
David Markley, Transpo Group, 23-148th Ave. S.E. , Bellevue,
WA 98007 Gerald Rasmussen,Rasmussen, ENTRANCO, 1515 116th Ave. N.E. , Bellevue,
WA 98004
Tom Gessford, 814 E. Pike, Seattle, WA 98122
Loren Davis , 1818 Westlake N. , Suite 308, Seattle, WA 98109
Carol Stoner, 19708 121st Ave. S.E. , Renton, WA 98055
Richard Carothers , 814 E. Pike, Seattle, WA 98122
TRANSMITTED THIS 29th day of July, 1982 to the following:
Mayor Barbara Y. Shinpoch
Councilman Richard M. Stredicke
Richard Houghton, Public Works Director
David Clemens , Policy Development Director
Members , Renton Planning Commission
Ron Nelson, Building & Zoning Director _
Roger Blaylock, Zoning Administrator
Lawrence J. Warren, City Attorney
Renton Record-Chronicle
Pursuant to Title IV, Section 3015 of the City's Code, request for reconsideration must
be filed in writing on or before August 12, 1982. Any aggrieved person feeling that the
decision of the Examiner is based on erroneous procedure, errors of law or fact , error in
judgment, or the discovery of new evidence which could not be reasonably available at the
prior hearing may make a written request for review by the Examiner within fourteen (14)
days from the date of the Examiner's decision. This request shall set forth the specific
errors relied upon by such appellant, and the Examiner may, after review of the record,
take further action as he deems proper.
•
An appeal to the City Council is governed by Title IV, Section 3016, which requires that
such appeal be filed with the City Clerk accompanying a filing fee of $25.00 and meeting
other specified requirements. Copies of this ordinance are available for inspection or
purchase in the Finance Department, first floor of City Hall .
I .J J•• :� -
INN
way . IAN L••r± 1D?Q .
. •g, ..• .I, : ' A, JE I " .
• r • t.. '. ,r, 4 '. .....7,-:'. ', ____. N
it !I/ 14. l�f I • Cf all i` t4
7 . C * 111104.p....,44: :' ' ' i 1 fin ill 1( : i \I • :,,: b. 1:,',.1.1th•114.ThP I.
e 101 1 -fx Du -- 111 i li .11iii , I. 1 : ' ;: 4 1 :' • • !P!::ki,44.4.:::::": •
',,744 /_il. a ` +4/ 1 ' I . ' . ' . . i .:ry• r4•' .. _ ��...1,•• ;:•y� yam.
t •�.• r • E c -a..
ieiw•_.-'tv.-..).. r ` I Rib. ..."
t.ii..„ . ...:.-..yv.,....., %, \ .i.....
.:01M--Ft . r,, 1 .
..
% . , v. 1 . :
•� !' ' \mow— ` '.......--'.'• •,\ •••.d .1....... a1........-•
•
REZONE: ALTERRA CORPORATION, File R-129-80 '
•
•
F
APPLICANT Alterra Corporation TOTAL AREA 171 acres
PRINCIPAL ACCESS Via S.W. 7th and Powell Ave. S.W. extension
EXISTING ZONING G-1, General Classification District
EXISTING USE Reparian Forest
PROPOSED USE Future warehouse and office use. .•
COMPREHENSIVE LAND USE PLAN Manufacturing Park, Greenbelt
COMMENTS
•
HAGGARD, TOUSLEY & BRAIN
ATTORNEYS AND COUNSELORS AT LAW
RUSSELL F.TOUSLEY 1700 DAON BUILDING
JOEL E.HAGGARD 720 OLIVE WAY
CHRISTOPHER I.BRAIN SEATTLE,WASHINGTON 98101
T ELECO PIER
WILLIAM N. SNELL (206)624-5299 (206) 624-8959
WILLIAM H. BLOCK
MICHAEL G. FULBRIGHT
KIM D. STEPHENS
July 26, 1982 OUR FILE No:
N15004
The Honorable Fred Kaufman
Hearing ExaminerRECEIVED
City of Renton OF RENT Renton City Hall MEARtNG'EXt9M�N ON Renton, Washington JUL
AM 2 3 1982
7,8,9r1A,1I,12i2 PM
RE: B1,ac,k: River .Office ,Park .Rezone
i2,3,4�5�C�
Dear Fred,
Pursuant to your instructions, we have enclosed a
revision of the Landscape Guidelines for the Black River
Office Park. The pages which have been revised have been
denoted in the bottom right hand corner of the page as
"Rev. 7/20/82". These revisions were made to accomodate
the modification (See Exhibit 12) of the original proposal
for preserve/development areas. Accordingly the enclosed
document should be substituted in place of the original
Landscape Guidelines in order to assure consistency with
Exhibit 12. In addition, there has been added to the
landscape guidelines per your instructions, "Guidelines
for Tree Preservation outside the "Preserve" Zone". This
is attached as the last page of the landscape guidelines.
We are also enclosing as a substitute for Exhibit
3 which was a large map board mounted a replacement map
which is folded and can be retained in your files. The
original board mounted exhibit could be destroyed as we
have no need for recovery of it ourselves.
We are in the process of obtaining legal
descriptions for the various preserve areas and upon
The Honorable Fred Kaufman
July 26, 1982
Page 2
receipt of them will be forwarding them to you.
Sincerely yours,
HAGGAR , US EY & BRAIN
--///
J el Hagg rd
JEH/lbg
6239B
Enclosure
cc: Ron Neubauer, Esq.
Mr. Del Bonds
Mr. Richard Carothers
Mike Hunsinger, Esq.
4 C
• : _
OF RFC
d . ^% o BUILDING. & ZONING DEPARTMENT
.""- RONALD G. NELSON - DIRECTOR
•
Z o
p . MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH. 98055 • 235-2540
90 0'
O �P
d q SEP1E��
BARBARA Y. SHINPOCH
MAYOR
July 16, 1982
CERTIFIED MAIL
1/115428
RETURN RECEIPT REQUESTED
Mr. Del Bonds
Alterra Corporation
P.O. Box 66101 •
Seattle, WA 98166
SUBJECT: BLACK RIVER OFFICE PARK/F,ILE .R-129-80
Dear Mr. Bonds:
The Environmental Review Committee 'has further reviewed the above referenced
' rezone application and based ;on testimony <received by the ,Hearing Examinees public
hearing, Conditions One and Two: of our certified letter mailed to you on May 28,
1982, ;have now ;been modified. With this revision, the Committee imposes the
following ,conditions necessary to Mitigate the adverse impacts Of ,the proposal:
;1. Prior to second 'reading of Any ordinance rezoning the subject property, 'the
jpr.operty owner §shall:
;a. Dedicate iin perpetuity for storm drainage purposes that area,
'rapp'rtoxirnatehy (9.14 acres, identified in the 'SCS iP-1 project as the
;fare'bay pending ;area, and.,
b. Preserve in ;perpetuity by Open space .easement to the City of 'Renton for
w-ildlife and natural vegetation mitigation ;purposes that area,
approximately 10.5 acres, illustrated in Exhibit 12, 'R-.129-80, as CR and
P.
2. Any development of the subject property shall maintain the current (at the time
of construction) one hundred (100) year flood storage volume.
3. Any future development of the subject property shall be subject to further
specific environmental review with total building floor area and type established
upon the following criteria:. ,
sr
Mr. Del Bonds
July 16, 1982
Page Two
- I
a. Adequacy of transportation access. Any intersection impacted by the
proposed development if above LOS-C shall not fall below LOS-C. If this
happens the developer shall make such improvement to return to LOS-C.
Any intersection below LOS-C prior to development shall be maintained
at its present LOS by improvements by the developer. If the intersection
is presently below 1.0 V/C the developer shall make any improvements to
insure the existing V/C ratio.
b. Adequacy of fire response. The applicant shall demonstrate how a
satisfactory response time can be established for' fire apparatus.
c. Adequacy of water and sewer utilities. Water and sewer systems shall be
established at such size capacity and location to meet therequirements
of the buildable area established by 3a and 3b above and the Utilities
Comprehensive Plan.
4. The cost of any capital improvements required to implement paragraph 3 above
shall be the sole initial responsibility of the developer. Any late comer
provisions provided by local':ordinance shall apply,
Very truly ,yours,
•
/7/ •
Yonai'd (G_ :"iNd'lson 0av4d 1R. Clemens
,IB;widin.g & :Zoning Director - 'Policy Development Director
Richard C."+Houghton
• Public 'Works Director
cc: Mr. Joel Haggard
C2-7
g
THE CITE OF RENTON
POLICY DEVELOPMENT DEPARTMENT • 235-2552
MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.98055
co-
ON).'ED SEP1°#�
BARBARA Y. SHINPOCH
MAYOR
MEMORANDUM
i
DATE: November 20, 1987
TO: Black River Task Force
FROM: Nancy Laswell Morris
SUBJECT: DOE Administrative Order for Rehabilitation
In the meeting between DOE and the City last Friday, Terra
Prodan stated that DOE would be willing to compromise their
order requiring rehabilitation of the Black River site by
possibly "trading" some portions of the current natural area
on an acre-for-acre basis for a new area to be designated
natural on the Shoreline Amendment which would more
realistically reflectiresources and habitat values. To that
end she proposed a series of overlays which defined a
possible new natural area. For discussion purposes we have
planimetered the existing "natural" area and the proposed
preservation/rehabilitation areas:
EXISTING NATURAL AREA 20. 3 acres
(north of confluence of Springbrook
Creek and Old Black River channel)
PROPOSED PRESERVATION/REHABILITATION AREA 20.6 acres
Existing Preserve 7.7 acres
200 feet from Shoreline 3 .5 acres
600 feet from Rookery 5.2 acres
S4 area from Study 2.8 acres
E 02/3 and E 2/3 area 144 acres
SUMMARY OF ALTERRA REZONE
(Blackriver Corporate Park Site)
Description: Application for rezone of approximately 71
acres of property from G-1, General Use to
Manufacturing Park for future warehouse and
office use.
ENVIRONMENTAL ASSESSMENT
(May 28, 1982)
(Modified July 16, 1982)
The Environmental Review Committee, after reviewing comments
on the final EIS, imposed the following conditions to mitigate
adverse impacts of the proposed office park:
1. Prior to second reading of any ordinance rezoning the
subject property, the property owner shall:
a. Dedicate in perpetuity for storm drainage purposes
that area (approximately 9. 14 acres) identified in
the SCS P-1 project as the forebay pending area,
and;
b. Preserve in perpetuity by open space easement to
the City of Renton for wildlife and natural
vegetation mitigation purposes, that area of
approximately 10.5 acres, illustrated in Exhibit
12, R-129-80, as CR and P.
2 . "Any development of the subject property shall maintain
the current 100 year flood storage volume at the time of
actual development. "
3 . This condition was modified by the executive in a letter
dated July 16, 1982, as a result of uncertainties
surrounding the determination of the final 100 year flood
level by FEMA.
a. Adequacy of Transportation Access: Any intersection
impacted by the proposed development, if above LOS-
C, shall not fall below LOS-C. Any intersection
below LOS-C prior to development shall be maintained
at its present LOS by improvements by the developer.
If the intersection is presently below 1. 0 V/C, the
developer shall make any improvements to insure the
existing V/C ratio.
Summary of Alterra Rezone
January 22, 1988
Page 2
b. Adequacy of Fire Response: The applicant shall
demonstrate how ,a satisfactory response time can be
established for fire apparatus.
c. Adequacy of Water and Sewer Utilities: Water and
sewer systems shall be established at such size
capacity and location to meet the requirements of
the buildable area established by paragraph 3a and
3b above and the Utilities Comprehensive Plan.
4. The cost of any capital improvements required to
implement paragraph 3 above shall be the sole initial
responsibility of the developer. Any latecomer
provisions provided by local ordinance shall apply.
LAND USE HEARING EXAMINER'S RECOMMENDATION/DECISION
(July 29, 1982)
The Land Use Hearing Examiner recommended approval of the
rezone application to the City Council subject to an agreement
implementing the following conditions:
1. The applicant dedicate the lands contiguous to the main
preserve, including the channel area and the lands
immediately adjacent to it, to the City to be used as
greenbelt and open space.
2 . Restrictive covenants be prepared to ensure the following
items are complied with:
a. Prohibit the development or placement of any
structures on these lands with the exception of
flood control structures on lands defined as the P-1
Channel.
b. Indicate that the Donee has received development
credit for the acreage and the land must remain
perpetually undeveloped.
c. Preserve the small pockets of trees by appropriate
means as indicated in the landscaping guidelines and
subject to approval by the City's landscape
architect with the provision that approximately 5
square feet of land is necessary for each caliper
inch.
Summary of Alterra Rezone
January 22, 1988
Page 3
3 . The property not in the preserve area (51 acres) should
be treated for developmental purposes as 71 acres subject
to 995,781.5 square foot maximum and other regulations of
the City.
4 . The applicant's dedication of the areas designated for
the P-1 Channel or counterpart should be acknowledged and
the applicant granted flood storage capacity credit to be
utilized upon the remaining acreage. This figure will
have to be derived from the calculations based upon
analysis by FEMA of the one-hundred year flood level and
further calculations of the amount of credit which would
be created by the dedication and eventual construction of
some form of flood control channel
5. The elevation at which the property will have to be
developed to ensure flood proofing will be determined by
the FEMA studies. If the land dedicated for the P-1
Channel does not provide the necessary storage capacity
lost by development on the site, then the applicant will
have to provide equivalent storage capacity.
6. The land should be developed in accordance with the
landscape concepts in the landscape guidelines.
CITY COUNCIL DECISION
(December 27, 1982)
The City Council approved the rezone with the passage of
Ordinance No. 3694. The ordinance was accompanied by an
agreement between the City and Jag-Renton Associates and
Renton Property Associates providing easements for greenbelt,
open space, wildlife habitat, flood control, and utilities.
SUMMARY OF AGREEMENT
(Renton Property Associates,
Jag-Renton Associates, and City of Renton)
Agreement States That:
Section 1 - Condition: States agreement null and void if City
does not change zoning classification to M-P, Manufacturing
Park.
Summary of Alterra Rezone
January 22 , 1988
Page 4
Section 2 - Easement Grant: States that RPA conveys and quit-
claims the City an easement for greenbelt and open space
purposes and easements for flood control, greenbelt, open
space, and wildlife habitat in Parcels A, B, and C. Both RPA
and the City has the right to excavate the Flood Storage
Control property and locate structures only for flood control.
In addition, the City and Jag/RPA agree to retain property by
which the City may have access across the retained property
and that utility lines could be located over and across
greenbelt and/or flood control property. In each case,
efforts are to be made tolrestore sites to original condition
after installation , and utility lines are not to interfere
with existing City or other utility lines.
Section 3 - Limitation: Easement rights granted the City on
quit-claims basis only; areas are subject to all rights,
covenants, reservations, and restrictions applied to the
greenbelt and flood storage property.
Section 4 - Fee Title: Discuss conditions of quit-claim of
fee title to City of greenbelt and flood control properties.
Section 5 - Development Credit: Discusses that the retained
property will be treated as if it included the area of the
greenbelt property and flood control property within its
boundaries and credit retained property with the flood storage
capacity of the flood control property and that no buildings,
structures or improvements in the conveyed properties shall
reduce the number of gross square feet which may be
constructed nor increase flood storage capacity for the
retained property.
Section 6 - Joinder: Agreement to join in any further
conveyances described in Section 4 binding on Hansen
successors.
Section 7 - Miscellaneous: Discusses how document could be
used and that it was binding on all parties and heirs,
successors and assigns of the agreement.
Rezone for Holvick, deRegt, and Koenig
R-072-82
Description: Rezone of 25.89 acres of property for G-1 to
M-P for office/research and development use.
Environmental decision: The Environmental Review Committee
issued a memorandum of concurrence.
Blackriver Disc-a:blksum
3595Z
BLACK RIVER OFFICE PARK FEIS
SYNOPSIS OF COMMENTS FROM GOVERNMENTAL
AGENCIES AND UTILITIES
U.S. DEPARTMENT OF AGRICULTURE - SOIL CONSERVATION SERVICE:- - (06-01-81)
The Soil Conservation Service recommended that development be deleted north
and northeast of the Black River pump plant. They also felt the riparian
forest is not recognized as . a natural resource having "scientific and
educational value", but instead,, more of a visual resource. They questioned.
that isolated trees to be preserved may not survive because of the change of
, the ecosystem. They also feel that the forest is an important design feature
of the Green River's holding pond and good for wetland wildlife habitat. They
desired clarification as to drainage into the area because of the wetland, and .
finally, the adequacy of the present road for high volume traffic was
questioned.
STATE OF WASHINGTON - DEPARTMENT OF FISHERIES: (05-28-81)
Because a 50 foot setback would be maintained from the bank of the Black River
channel, they wanted to know what was considered the top of the bank and what
would be the physical dimensions and configurations of the riparian zone.
They were encouraged that oil/water separators would remove most pollutants
from stormwater runoff. They realized that urban pollutants would increase
with runoff and wanted to know its effect upon the wetland. They also wanted
to know if the character of the riparian wetland (70 acres) would be altered.
They corrected the E.I.S. in that chum salmon do not migrate into Springbrook
Creek.
They felt it helpful to show- how the project would relate to the plans
developed by the SCS for flood storage upstream of the P-1 plant.
Finally, they noted that a Hydraulic Project Approval issued by the Department
of Fisheries and the Department of Game would be required prior to the start
of any work within the "ordinary high flow line of Springbrook Creek, the
Black River, or their tributaries".
STATE OF WASHINGTON - DEPARTMENT OF GAME: (06-08-81)
They felt that the woodlands was important for fish and wildlife resources and
is useful to maintain winter and summer stream flows. The project proposal
would have serious consequences also for water quality because the loss of :
wetlands would reduce dissolved oxygen in the creek and river during summer
flows.
pp Rvopp
sarEIS
synopsisf commmentfom
Governmental Agencies and Utilities
Page 2
They state that water quality degradations would impact fish resources of
Springbrook Creek and the Black River. They stressed the importance of
wetlands for wildlife habitat - especially along streams and how the loss of
wetlands would be mitigated.
In summary, ' they were concerned with the loss of the public's fish and
wildlife resources because of the project and stressed that growth would have'
to be planned for fish and wildlife to survive with urbanization.
STATE OF WASHINGTON - DEPARTMENT OF TRANSPORTATION: (05-18-81)
They estimated that 9,070 to 34;030 vehicle trips per day would pass through
the Monster Road/Sunset boulevard intersection, and that it may require
rechannelization and possibly signalization of that intersection. They wanted
the developer to pay for the street improvements since they had no money in
their operating program.
SEATTLE/KING COUNTY COMMUTER POOL': (05-28-81)
They were encouraged of the methods addressed that gave alternatives to the
single occupancy vehicle. They did recommend for a detailed study to explore
the potential for supplementing an aggressive ride sharing program which would
include preferential carpool/vanpool parking, sponsorship of a vanpool
program, and other affirmative efforts as a means to reduce the
traffic/parking impacts. They feel from experience, that in order for large
numbers of commuters to change their travel behavior, they must be given the
opportunity to do so through an organized ridesharing program. They also
included a list of possible methods that the proponent could employ in
devising solutions to the traffic/parking problem.
METRO: (05-26-81)
With respect to Wastewater Facilities/Water Quality, the following concerns
were addressed: !
1. Design and maintenance plans for the on-site stormwater detention
facilities should be incorporated into the final E.I.S. Also, the
riparian forest and wetland would serve in the control of stormwater
control system if saved from,development.
2. They wanted the proponent to provide a schedule of the East Watershed
Project as it relates to the schedule for development of the office
park.
With respect to transportation, METRO's Transit Development Division was
mentioned for possible extentions to the site, and their Customer Assistance
for transit incentive measures.
�, Black River Office Park FEIS
• Synopsis of Comments trom
Governmental Agencies and Utilities
Page 3
•
PUGET SOUND AIR POLLUTION CONTROL AGENCY: (05-27-81)
They did not feel that air quality was addressed well because of the impact of
traffic and suggested that on-site monitoring and modeling be performed to
determine current and future carbon monoxide concentrations; They also stated
that upgrading of existing roadways and other mitigating measures discussed in
the E.I.S. should be implemented.
KING COUNTY - DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT: (05-29-81)
They felt that the future E.I.S. and site plans should acknowledge the
significance of the Springbrook Creek riparian edge and discuss how to
minimize adverse affects that would compromise enhancement plans for the
storage pond area. They also did not feel .a rezone decision should be made
until environmental and economic consequences of the proposed development are
substantially evaluated and completed.
Studies as part of the County-wide parks and open space bond program,
recommended the property as the third highest priority wetland for acquisition
under the bond program.
They did not feel that mitigation proposed would be adequate to compensate for
the detrimental impacts of the proposed project. Their letter went on to
discuss other areas of concern, i.e. , impacts of recreation, the flood storage
pond upstream of the P-1 pump plant, saving of top soils, erosion potential,
surface runoff, flooding elevations, vegetation, street access, fire services,
educational value of area, linkage to other parks and facilities, wetland
treatment, use and open space of the site and concentrated development of the
site.
. i .
BLACK RIVER CORPORATE PARK
HISTORY & CHRONOLOGY OF LAND USE DEVELOPMENTS FOR PORTIONS
OF PARK SURROUNDING FOREBAY
•
''• Rezone for John Hanson - file R-432-79
Description: Rezone of approximately 40 acres of property from G to M-P.
_ -
Environmental Decision:
October 29, 1979: The Responsible Official issued a proposed declaration of
significance due to: 1) limited access, 2) the substantial impact on the riparian
forest, and 3) impact on the P-1 channel program together with the impact of the
removal of vegetation on the wildlife.
The Black River Office Park E_IS was prepared:
c. Unique Physical Features
Impacts
Development of the proposal will necessitate removal of 38.6 acres
of the 59.5 acre riparian forest located on the site.
I
Mitigating Measures
- Existing vegetation will be preserved on significant portions
of the site.
- A master landscape plan will be prepared to ensure good design
practice and preservation of as much of the riparian vegetation
as possible.
- As many of the existing trees as possible should be retained
through maintenance of greenbelt areas in order that large
groups of trees and understory remain undisturbed.
- The Black River Channel will be protected by a 50 to 100 foot
setback from the top of the bank.
3. Water
a. Surface Water Quantity/Quality
Impacts
Increased surface runoff from the site as well as increased levels
of polluted surface runoff would result from the proposed action.
Alteration of runoff characteristics will occur in that diversion
of stormflow into ditches and storm pipes will prevent water from
flowing to low lying areas and may cause some drying up of wetlands
that will be preserved on site, unless storm drainage measures are
undertaken to protect them.
. I
Black River Corporate Park History & Chronology
Page 2
Mitigating Measures ,
- Temporary detention and settling ponds should be utilized
during construction of foundations to collect silt and minimize
turbidity.
- Stormwater runoff will be collected in a,__storm sewer system
approved by the Renton Public Works Department.
- Oil/water separators should be utilized to remove petroleum
products from storm water. ...
- Adequate street and parking area cleaning and maintenance of
the stormwater system should be provided.
- Catch basins and screens should be included in the stormwater
system to collect litter and debris.
- No development will occur within a 50 foot setback from the top
of the bank of the, Black River Channel .
b. Floods
Impacts
Fill material will be utilized to bring building sites above the
100 year flood elevations.
Mitigating Measures
- Fill material will be required to bring some building sites
above the 100 year flood plain which will prevent on-site
flooding.
- Some areas could be left unfilled which may reduce the amounts
of flood storage displacement that occurs on the site.
c. Groundwater Quantity/Movement
Impacts
Project development would result in an increase of impervious
surface on the site, which would decrease the amount of
infiltration of precipitation. •
Mitigating Measures
A reduction in building site coverage could require less filling.
Black River Corporate Park History & Chronology
Page 3
4. Flora -- -
Impacts
Approximately 84% of the site consists of a unique wetland
deciduous forest, a part of the largest forest of this type in- the
Seattle area. As a result of the proposed action about 78% of this
riparian forest would be removed and be replaced by building
foundations, roads and parking areas.
Mitigating Measures
- As many of the existing trees as possible should be retained
through maintenance of green belt areas in order that large
groups of trees and understory remain undisturbed.
- A master landscape plan will be prepared to assure good design
practice and
preservation of as much of the riparian vegetation
as possible.
- Placement of building sites, parking lots and roads should be
based on tree inventories provided by field surveys.
- Vegetation along the Black River Channel should be preserved
and maintained by the proponent.
5. Fauna
Impacts
Removal of most wildlife habitat and reduction in most native
wildlife due to intrusion of human activity.
Mitigating Measures
- Landscaping materials that provide food sources for birds and
small animals should be utilized.
- As much natural vegetation should be retained as possible.
- Surface water quality along Black River should be
preserved by planti7g natural riparian vegetation along the
drainage-way banks and maintaining wetlands wherever possible.
Black River Corporate Park History & Chronology
Page 4
• Rezone for First City Equities R-328-79
Description: Rezone of 70 acres of property on a portion of the Earlington Golf
Course to M-P, Manufacturing Park
Environmental Decision: May 3, 1979
The Responsible Official issued a final declaration of non-significance for the
rezone. It was noted that an EIS would be required prior to site development.
The checklist noted that there may be some changes in the diversity of species or
numbers of any species of fauna and that there would be no reduction of the number
of unique, rare or endangered species of fauna (p. 4 of checklist).
Earlington Park EIS
(DEIS - July 1980 and FEIS - May, 1981)
SUMMARY OF MITIGATIONS
* - Those mitigations which are presently scheduled to be implemented
by the developer are noted with an asterisk.
EARTH
* The City's requirements on grading and excavation will be followed.
(Phases 1 and 2)
* The recommendations of the souls engineer will be followed. (Phases 1 and 2)
• Detailed soils profiles will be established when final site plans are
avai$able. These profiles will facilitate design of the most suitable
footings and minimize the need for excavation or structural fill to
accommodate foundations. (Phases 1 and 2)
An alternative site design could preserve the northern portion of
Springbrook Creek in open space. (Phase 2) •
EROSION
• Restrict major clearing and filling activities to summer months.
(Phases 1 and 2)
Revegetate exposed xposed soils in a timely manner so as to prevent further
erosion. (Phases 1 and 2)
▪ Retain vegetation buffer strips between construction activities and
streams and associated wetlands. (Phases 1 and 2)
Black River Corporate Park History & Chronology
Page 5
AIR (Phases 1 and 2)
* Utilize low-emission construction equipment whenever possible.
* Measures to control construction dust, such as watering and reseeding of
cleared areas, cleaning and sweeping of streets will be implemented.
Refer to the mitigating measures under "Transportation/Circulation-
vehicular Transportation Generated" on page 73 of this document.
WATER (Phases 1 and 2)
* The vegetation along the remaining 1.89 acres of old Black River
Channel will be retained and enhanced with additional plantings.
* The existing 60-inch storm sewer outfall will be extended approx-
imately 550 feet to the west.
* All site runoff, save for the northwest portion drainage, will be dis-
charged into the upstream end of the old Black River Channel, where it
will undergo wetland treatment prior to discharge into Springbrook
Creek/Black River.
* Careful construction practices will prevent litter, debris or other
pollutants from entering drainage.
Utilize temporary detention ponds during construction phases to collect silt.
* Collect stormwater runoff in a storm sewer system, as approved by Renton
Public Works Department.
• Utilize catch basins and screens to collect litter and debris.
▪ Utilize oil/water separators to retain gas, oil and grease for removal
from stormwater.
▪ Settling basins would remove solids from runoff.
Skimmers would remove petroleum Products and floating debris.
Provide adequate street and parking area cleaning and maintenance of the
stormwater system.
* The drainage from the northwest portion of the site will be directed to either
an on-site detention pond or the P-1 Channel if it is constructed.
Wetland treatment could be enhanced by constructing a gabion at the
downstream end of the Black River Channel as a means of increasing runoff
detention time and increasing surface water contact area for the one-
year storm and smaller flows.
Black River Corporate Park History & Chronology
Page 6
3 '
FLORA/FAUNA (Phases 1 and 2)
* Retention of as many of the existing trees as possible through sensitive
site planning as indicated in Figure 4, p. 2 of the Draft EIS.
* A landscape plan will be prepared to assure good design practice and
consistency throughout the site.
* Retain vegetation outside of road and railroad improvements until
buildings are constructed, as feasible.
The new landscaping plan should include compatible and similar species
to the existing vegetation.
Minor modifications of building siting could occur based upon tree
inventories provided by field surveys.
* New natural riparian vegetation shall be planted along the drainageway
banks, providing cover and habitat.
Utilize landscaping materials, that provide food sources for birds and
small animals.
Mitigations to preserve surface water quality should be implemented.
•
� I
s II
9 I
d •
Black River Corporate Park History & Chronology
Page 7
• Rezone for Alterra - file R-129-80
Description: Rezone of 71.116 acres of property from G-1 to M-P for future
warehouse and office use.
Environmental Decision:
The Environmental Review Committee after reviewing comments on the Final EIS
imposed the several mitigating 'conditions including the dedication of the area for
the SCS P-1 forebay area and the dedication of 12 acres of property for wildlife and
natural vegetation mitigation.
The environmental issues reviewed were covered by the Black River Office Park EIS.
© Rezone for Holvick, deRegt and Koenig ; CL-0'12.•4
Description: Rezone of 25.89 acres of property for G-1 to M-P for
office/researchi and development uses.
Environmental decision:
The Environmental Review Committee issued a memorandum of concurrence.
The checklist indicates a change in the diversity of species or numbers of species
with respect to flora and a change in the diversity of species of fauna together with
a deterioration to existing fish and wildlife habitat.
o Preliminary Plat and Fill and Grade Permit: PP=089-84, SP-090-84, V-091-84
I -
Environmental Decision: September 27, 1984
The Environmental Review Committee issued a final declaration of non-significance
with conditions including the preservation of trees as shown on the conceptual land
use/preservation plans, Exhibit 12, of Rezone R-129-80 and that greenbelt areas not
be disturbed.
The checklist indicated that there would be a reduction in the diversity of species or
numbers of any species of flora together with a reduction in the numbers of any
unique, rare or endangered species. (Noted that this was a reparian forest.) The
checklist further indicates that there will be a change in the diversity of species
together with a deterioration to ('existing fish or wildlife habitat. It was also noted
that due to clearing and filling operations species may relocate to preserve areas
(p.4 of the checklist).
'. Black River Corporate Park History & Chronology
Page 8
a Special Permit (Fill & Grade): SP-024-86
Description: Fill and grade permit to place 425,000 cu. yds of fill on property
(Alterra site)
Environmental Decision: April 16. 1986
The Environmental Review Committee issued a determination of non-significance
with conditions which covered the hours of operation, the fill.material, haul routes,
and clean streets.
The checklist noted that some of larger cottonwoods and ash would remain on the
-developable property and with respect to animals referred reviewer to DEIS and
FEIS for Black River Office Park.
®- . Special Permit (Fill and Grade): SP-100-86
Description: Fill & grade to Mallow regrading and filling with 114,000 cu. yds of
material on 453 acres. Project still pending with the Hearing
Examiner.
Environmental Decision: October 22, 1986 •
The Environmental Review Committee issued a mitigated DNW. with conditions on
haul routes, type of file and hours of operation.
The checklist noted that all vegetation would be removed except for large
cottonwood and ash. Under Animals, Sections A and B were not filled; however,
under Section C the applicant indicated site is not part of a migration route.
© Infrastructure Project: File SA-108-86, V-109-86, SM-005-86
Description:
Master concept for verifying signing, landscaping, streets, paths, and exercise areas
to integrate phased development for the 130 acre Black River Office Park (includes
405 Office Park).
Environmental Decision:
None to date. Applicant asked to�withdraw application. Environmental application
may still be reviewed for the project by the committee.
The checklist notes types of plants on site. With respect to animals the applicani:-
noted heron, seagulls, sparrows and ducks on-site and also noted that none were
threatened species nor was the site pasrt of a migration route.
Black River Corporate Park History & Chronology
Page 9
o Site approval for Phase IV: file SA-001-87, SM-001-87
Description: Construction of 3-story office building with 74,000 sq. ft. and
application for substantial shoreline development on 5.85 acres.
Environmental Decision:
The Environmental Review Committee decided to issue a mitigated determination
with conditions concerning preserving existing vegetation, circulation, parking,
protection of herons, months of construction activity, water quality, light and glare
and traffic.
The checklist indicates heron, seagulls, sparrows, and ducks. No fish were noted.
Noted no threat to endangered species and that site not part of a migration route.
-8W
CITY OF RENTON, WASHINGTON
ORDINANCE NO . li6.94_
AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, CHANGING
THE ZONING CLASSIFICATION OF CERTAIN PROPERTIES WITHIN THE
CITY OF RENTON FROM GENERAL CLASSIFICATION DISTRICT (G) .
TO MANUFACTURING PARK (MP) (R-1294,0 ALTER CORP)
WHEREAS under Chapter 7 , Title IV (Building Regulations) of
Ordinance No . 1628 known as "Cade of General Ordinances of the City
of Renton" , as amended, and the maps and repotta adopted in
conjunction therewith, the property elaw described has
heretofore been zoned as General Classilitation District (G) ; and
WHEREAS a proper petition far change af Zone classification
of said property has been filed with the Building 'and Zoning Department
on or about June 2 , 1982 , which petitian WaS duly referred to the
Hearing Examiner for investigation, Study end public hearing, and
a public hearing having been held thereon at OT about June 15 , 1982 ,
and said matter having been duly considered by the Hearing Examiner
and said zoning request being in conformity with the City ' s
Comprehensive Plan, as amended , and the City -Council having duly
considered all matters „relevant thereto , and all parties having
been heardappearing in support thereof Of it apposition thereto ,
NOW THEREFORE,
THE CITY COUNCIL OF THE CITY OF RENTON , WASEIVGTON, DO
ORDAIN AS FOLLOWS :
SECTION I : The 'following described property in the City
of Renton is hereby rezoned to Manufacturing Park (MP) as hereinbelow
specified ; subject to the findings , concluSions and decision of
the Hearing Examiner dated July 2:9., 1982 ; the Building and Zoning
Director is hereby authorized and directed to change the maps of
the Zoning Ordinance , as amended, to evidence said rezoning, to-wit :
See Exhibit "A" •attached hereto andmade adea, part hereof
as if fully set forth hereih .
(Said property being located Notth of :S.W. Tth Street
east of the proposed P-1 Channel , &oath Of the old
Chicago Milwaukee Paul Railroad right-of-way, and
west of the extension Of Thomus Avenue S .W. )
•
SECTION II : This Ordinance shall be effective upon its
passage , approval and five days after its 1)121)1i/cation .
PASSED BY THE CITY COUNCIL thisnth day cf D'etetber , 1982 .
Maxine . 'otor , . ity
APPROVED BY THE MAYOR thisntladay of DttaMber, 1962 .
_
Bazi-.,ara Y.. ole , lnpoc , Mayor
Approved as to form:
Lawrence J . Warren, City Attorriey
Date of Publication : January 7, 1983
fr‹.- / a ci-Tgia
•,
R3., I_I j, •'1_IG'i #I 1339 E
I RE CD F ' 29.50
AGREEMENT • - .0
• This AGREEMENT (this "Agreement" ) is made
this 29th day of December , 1982, by and between
Renton Property Associates, a Washington general
• partnership. ( "RPA" ) , JAG-Renton Associates, a Washington
general partnership ( "JAG" ) , and the City of Renton, a
Washington municipal corporation (the "City" ) .
•
.71 RPA is the fee owner of that certain real
property legally described on Exhibit 1 hereto ( "Parcel
O A' ) and that certain real property legally described on
p Exhibit 2 hereto ( "Parcel B" ) .
4.4
o JAG is the owner of a contract vendee's interest
oD in that certain real property legally described on Exhibit -
3 hereto ( "Parcel C' ) pursuant to that certain Real Estate
Contract recorded as Instrument No. 8004240435 in the
Records of King County, Washington, by and between JAG and
John B. Hansen, Inc . , a Washington corporation
( "Hansen" ) .
Alterra Corporation, a Washington corporation
( "Alterra" ) , as agent for RPA and JAG, has requested the
City to rezone Parcel A, Parcel B, and Parcel C
(collectively the "Rezone Property" ) from their present
classification of G-1 to the new classification of M-P
under the City Municipal Code . A general diagram of the
Rezone Property is attached as Exhibit 4 hereto. The
City's Office of the Land Use Hearing Examiner has
recommended changing th'e zoning classification of the
Rezone Property to the M-P classification upon certain
terms and conditions as set forth in that certain Report
and Recommendation to the Renton City Council (the
'Report" ) dated July 29, 1982, issued under File No. .
R-129-80. RECORPEfl 1HIS
Now, therefore, the parties hereto do hereby JAN 5 2 08 PI
agree as follows:
BY +f711: Divl ,lu
Section 1 . Condition. Pursuant to the Report, RF(:OI.:ii x I:.t_Ec'
. RPA and JAG are required to take certain actions before KINU 'COUNT1
the City ordinance on the rezone requested by Alterra is
heard and decided . The, terms and conditions of this
Agreement shall be without prejudice to the City Council's
deliberations on said ordinance, but this Agreement and
each and every provision herein are conditioned upon the
City's changing the zoning classification of the Rezone
Property to M-P subject: only to the terms and conditions
set forth in the Report'. If the City fails to change the
zoning classification of the Rezone Property to M-P, this
• Agreement shall be nulL and void and none of the parties •
hereto shall have any rights hereunder .
. Section 2 . Easement Grant . The provisions of
this Section 2 are conditioned upon the City's compliance
with each and every term of this Agreement .
2 .1 RPA hereby conveys and quit claims _to
the City an easement for greenbelt and open-space purposes
in those portions of that certain real property legally
described on Exhibits 5, 6 and 7 hereto (the -"-Greenbelt-
•
12/17/82 .
7792B 1
Property' ) located within Parcel A and Parcel B and an
easement for greenbelt, open-space, wildlife habitat and
flood control purposes in that portion of that certain
real property described on Exhibit 8 hereto (the "Flood
Control Property' ) located within Parcel A. Prior to the
conveyance anticipated by Section 4 hereof, neither RPA
nor the City shall be entitled to locate any structures
upon the Greenbelt Property. RPA and the City shall each
be entitled to excavate the Flood Control Property for
flood control purposes and locate structures serving flood
control purposes, and no others, upon the Flood Control
Property.
0) 2 .2 JAG hereby conveys and quit claims to
c) the City an easement for greenbelt and open-space purposes
in those portions of the Greenbelt Property located within
;n Parcel C and an easement for greenbelt, open-space,
wildlife habitat and flood control purposes in that
portion of the Flood Control Property located within
;, Parcel C. Prior to the conveyance anticipated by Section
4 hereof, neither JAG nor the City shall be entitled to
locate any structures upon the Greenbelt Property. JAG
and the City shall each be entitled to excavate the Flood
Control Property for flood control purposes and locate
structures serving flood control purposes, and no others,
upon the Flood Control Property.
2 .3 JAG and RPA hereby convey and quit
claim to the City an access easement over and across the
Rezone Property for purposes of excavating and
constructing flood control structures upon the Flood
Control Property; provided, that ( i) the City shall only
use such portions of the Rezone Property that are not
within the Greenbelt Property and or the Flood Control
Property (the "Retained Property" ) for such access
purposes as may be reasonably designated for such use by
RPA and or JAG, ( ii) the City shall make reasonable
efforts to restore and repair any damage caused by its use
of the Retained Property, and ( iii) the City shall execute
and acknowledge any and all instruments reasonably
requested by RPA and or JAG for the purpose of confirming
the exact location or locations of the easement granted
the City by this Section 2 .3 .
2 .4 JAG and RPA each hereby reserve the
right to locate utility lines, including, without
limitation, lines for water, sewer, gas, electric and
telephone service, over and across the Greenbelt Property
and or the Flood Control Property and the right to enter
upon said properties for the purpose of installing,
maintaining and relocating such lines, provided that ( i)
JAG and or RPA shall make reasonable efforts to restore
such properties to their original condition after the
installation of any such utility lines and ( ii) such
utility lines shall not be located in a manner that will
unreasonably interfere with either any then existing •
utility lines of the City or any utility lines which the
City then has specific and definite plans to install in
specific locations .
Section 3 . Limitation. The easement rights
granted the City herein are granted on a quit claim basis
only and are subject to all rights, covenants,
reservations, and restrictions applicable to the Greenbelt
12/17/82
7792E 2
elk*
Property and the Flood Control Property as of the date
hereof, including, without limitation, those matters
described in Exhibit 9 hereto.
Section 4 . Fee Title . Provided that the City is
not in breach of any of the terms and conditions hereof,
at such time or times as the Greenbelt Property and or the
Flood Control Property have been segregated into separate
legal lots, RPA and or JAG, as appropriate, shall quit
claim the fee title to the Greenbelt property and the
Flood Control Property to the City; provided that any such
conveyances shall ( i) be subject to all matters described
in Section 3 and Exhibit 9 hereof, (ii) restrict the City
from using the subject property except as set forth in
c) Section 2 hereof, and ( iii) reserve the rights set forth
in Section 2 .3 hereof, and provided further that any
;17 conveyance of all or part of the Flood Control Property
O shall reserve a flood control easement in the Flood
Control Property for the grantor, which easement shall
a'� include the right to excavate, locate structures upon and
JO maintain the subject property for flood control purposes .
RPA and JAG shall also ( i) make application to the City,
within one year after the final adoption by the City
Council of an ordinance changing the zoning classification
of the Retained Property to M-P subject only to the terms
and conditions set forth in the Report , to have the
Greenbelt property in the Flood Control Property
segregated into separate legal lots.
Section 5 . Development Credit . Notwithstanding
either the easements granted the City under Section 2
hereof or a conveyance to the City pursuant to Section 4
hereof, for purposes of all land use and or building
applications of any kind related to the Retained Property,
the City and each of its individual departments, offices,
agencies, officers, agents and employees shall ( i) treat
the Retained Property as if it included the area of the
Greenbelt Property and the Flood Control Property within
iLs boundaries and ( ii) credit the Retained Property with
the flood storage capacity of the Flood Control Property,
which credit shall include any increase in flood storage
capacity beyond that existing on the date hereof . In
addition, no buildings or other structures or improvements
located upon either the Greenbelt Property or the Flood
Control Property shall in any way reduce the number of
gross square feet which may be constructed upon the
Retained Property or increase any flood storage capacity
or storm water retention requirements for the Retained
Property. For example, without limitation, RPA and or JAG
shall receive credit for the development acreage
equivalencies of the Greenbelt Property and the Flood
Control Property and the flood storage capacity of the
Flood Control Property when developing the Retained
Property. Notwithstanding anything contained herein to
the contrary, the City shall not be obligated to allow the
construction of more than 995,781 .5 gross square feet upon
the Retained Property.
Section 6 . Joinder . Hansen joins in this
Agreement for the purpose of subjecting its interest in
the Greenbelt Property and the Flood Control Property to
the terms and conditions contained herein. Furthermore,
as long Hansen retains an interest in the Greenbelt
Property and or the Flood Control Property, it agrees to
12/17/82
7792B 3
join in any future conveyances pursuant to Section 4
hereof. The provisions of this Section 6 shall be binding
upon the successors and assigns of Hansen.
Section 7. Miscellaneous.
7.1 Thelcaptions of this Agreement are for
convenience only and shall not be considered or referred
to in resolving questions of interpretation or
construction.
7 .2 Each and all of the provisions of this
Agreement shall be binding upon and inure to the benefit
of each of the parties hereto, and their heirs, successors
y, and assigns.
CD
In 7 .3 This Agreement may be executed in any
C number of counterparts and all counterparts shall be
p . deemed to constitute a 'single agreement. The execution of
c one counterpart by any party shall have the same force and
GO effect as if that party had signed all other counterparts.
IN WITNESS WHEREOF, the undersigned have entered
into this Agreement as of the date hereinabove first
mentioned.
CITY:
CITY OF RENTON,
a Washington municipal corporation
By CO,t .SAA.930644.0
Mayor
By
City Clerk
RPA:
RENTON PROPE ASSOCIATES
a Washingt neral ar er ip
By
Ronald G. Neub uer
General Partner .
' ('-7\N
BY J
th=i-J?
elton J. Bonds
General Partner
q//
BY
Ken044,e-W
neth L. Thomps
General Partner
By
erton Co en
General Partner
12/17/82
7792E 4
CITY OF RENTON, WASHINGTON
ORDINANCE NO . 3694
AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON , CHANGING
THE ZONING CLASSIFICATION OF CERTAIN PROPERTIES WITHIN THE
CITY OF RENTON FROM GENERAL CLASSIFICATION DISTRICT (G) .
• TO MANUFACTURING PARK (MP) (R-129-80 ALTERRA CORP)
WHEREAS under Chapter 7 , Title IV (Building Regulations) of
Ordinance No . 1628 known as "Code of General Ordinances of the City
of Renton" , as amended, and the maps and reports adopted in
conjunction therewith , the property hereinbelow described has
heretofore been zoned as General Classification District (G) ; and
WHEREAS a proper petition for change of zone classification
of said property has been filed with the Building and Zoning Department
on or about June 2 , 1982 , which petition was duly referred to the
Hearing Examiner for investigation, study and public hearing, and
a public hearing having been held thereon on or about June 15 , 1982 ,
and said matter having been duly considered by the Hearing Examiner
and said zoning request being in conformity with the City ' s
Comprehensive Plan , as amended , and the City Council having duly
considered all matters relevant thereto , and all parties having
been heard appearing in support thereof or in opposition thereto ,
NOW THEREFORE,
THE CITY COUNCIL OF THE CITY OF RENTON , WASHIfGT ON, DO
ORDAIN AS FOLLOWS :
SECTION I : The following described property in the City
of Renton is hereby rezoned to Manufacturing Park (MP) as hereinbelow
specified ; subject to the findings , conclusions and decision of
the Hearing Examiner dated July 29, 1982 ; the Building and Zoning
Director is hereby authorized and directed to change the maps of
the Zoning Ordinance , as amended, to evidence said rezoning, to-wit :
t \ \
See Exhibit "A" attached hereto and made a part hereof
as if fully set forth herein .
(Said property being located North of S .W. 7th Street
east of the proposed P-1 Channel , south of the old
Chicago Milwaukee St . Paul Railroad right-of-way, and
west of the extension of Thomas Avenue S .W. )
SECTION II : This Ordinance shall be effective upon its
passage, approval and five clays after its publication .
PASSED BY THE CITY COUNCIL this27th day of December , 1982 .
Maxine E . Motor , .,ity Clerk
APPROVED BY THE MAYOR this27th day of December , 1982 .
.
Bar ara Y. inpoc. , Mayor
Approved as to form:
('l
Lawrence J . Warren, City Attorney
Date of Publication : January 7, 1983
:•UILDIEG AND ZONING DEPARTMENT
PRELIMINARY :' ,:PORT TO Ti • HEARING EXAMINER
PUBLIC HEARING
JUNE 15, 1982 '
APPLICANT: ALTERRA CORPORATION
FILE NUMBER: R-129-80
•
A. SUMMARY & PURPOSE OF *.UEST
The applicant seeks a rezone of the subject site from
G-1 to M-P for future' warehouse and office use.
B. GNNERAL INFORMATION:
1 . Owner of Record: Delton J. Bonds, President
Alterra Corporation
2. Applicant: Delton J. Bonds, President
Alterra Corporation
3. Location:
(Vicinity Map Attached) North of S.W. 7th
Street, east of the
proposed P-1 Channel,
south of the old
Chicago Milwaukee
St.. Paul Railroad
Right-of-way, and
west of the extension
•
of Thomas Avenue S.W.
4. Legal Description: , A detailed legal
description is available
on file in the Renton
Building & Zoning
Department.
•
5. Size of Property: ' + 71 acres.
6. Access : Via S.W. 7th and
Powell Avenue S.W.
extension.
7. Existing Zoning: G-1 , General Classification
District; Minimum
lot size 35 ,000 sq. ft. '
8. Existing Zoning in the Area: G-1 , M-P, R-3, R-1 .
9.. Comprehensive Land Use Plan: manufacturing Park,
Greenbelt.
10. Notification: The applicant was notified
in writing of the hearing
date. Notice was properly
published in the Daily
Record Chronicle on
June 4 , 1982, and
posted in three places
on or near the site
as required by City
Ordinance on June
4 , 1982.
PRELIMINARY I )RT TO THE HEARING EXAMIN:- •_'
ALTERRA CORPORATION
JUNE 15 , 1982
PAGE TWO
C. I:aSTORY/BACKGRoD:
The subject site was annexed into the City by Ordinance
No. 1745 of April 14 , 1959 at which time the present
zoning classification was applied.
D. Pl; ,SICM BACKGROUND: •
1 . Topography: The site is generally level with variations
in elevation of approximately 12 feet where a large
amount of fill has be placed. To the south of
the railroad tracks the site slopes slightly downward
toward the south at a minor gradient.
2 . Soils : Tukwila Muck (Tu) . Permeability is moderate.
There is a seasonal high water table at or near
the surface. Available water capacity is high.
Runoff is p"onded and the erosion hazard is slight.
If drained, the woil is used for row crops . It
is also used for pasture. Woodinville Silt Loam
(We) . Permeability is moderately slow. There
is a seasonal highwater table at or near the surface.
Runoff is slow and the erosion hazard is slight.
• Stream overflow is a severe hazard unless flood
protection is provided. This soil is used for
row crops , pasture and urban development.
3. Vegetation: The southerly portion of the property
consists of the floodplain of the old Black River
channel while the northern part is heavily wooded
•
riparian forest composed of ash, willow, alder
and other species of trees with an understory of
blackberries and grasses .
4 . Wildlife: The existing vegetation provides suitable
habitat for a variety-of birds, mammals , reptiles
and fish.
5 . Water: A number of locations with standing water
are found on the subject site.
6 . Land Use: Between the site and the Renton Shopping
Center are a scattering of single family homes .
South of these homes and east . of the site the' land
use consists mainly of warehousing and some office
buildings. To the •south is the site of the old
Earlington Golf Course, the METRO Treatment Plant
•
and the P-1 pump station. Monster road is to the
west and the Burlington Northern railroad tracks
and beyond is the south side of Earlington Hill.
E. NEIDem l* 4 GOD CTERXST]CCS:
. The surrounding properties are a mixture of industrial
and office uses , undeveloped areas, and single family
homes.
F. Pui::LIC SERVICES:
1 . Water and Sewer : A 12-inch water main runs northward
along Monster Road and turns eastward where S.W.
7th Street would be if extended. The METRO gravity
lin extends along S.W. 10th Street and terminates
at the sewage treatment plant. A 10-inch sewer
lne extends from S.W. 7th Street along Powell Avenue
into the METRO gravity line.
' • PRELIMINARY REPORT THE HEARING EXAMINER
ALTERRA CORPORATION
JUNE 15, 1982
PAGE THREE
•
2. Fire Protection: ,Provided by the City of Renton
as per ordinance rlequirements.
3. Transit: Not applicable.
4. Schools : Not applicable.
5. Recreation: Not applicable.
G. APPLIC T L N Y' SECTIONS OF T m: ZONING CODE:
1 . Section 4-704 , G-1 ; General Zone.
2. Section 4-730, M-P; Manufacturing Park Zone.
H. APPLICABLE SECTIONS OF 1:;n COMPR. :10SIVE PIGS OR OTHER •
iI ICJ1A'L:8" L.L CI.L.Y . U1C71EtlLW JL:
1 . Green River Valley Comprehensive Plan, June 1976.
2. Policies Element, Comprehensive Plan (1981 ) , Policy
77��g�wmm6.A. 8, p. 71�p4�ry.��7�� 77�p7���T��y �y,� q��nn
I. ACJLn ON ,.I :,is NATURAL RAL OR i:i III\ A I' ENVII� OID :
1 . Natural Systems: Rezoning of the subject' site
will not have a direct impact upon the subject
site. A detailed review of environmental impacts
has been presented in the EIS.
2. Population/Employment: Approximately 4, 100 permanent
employees may be expected at the subject site.
3. Schools : Not applicable.
4. Social: Not applicable.
5. Traffic: The proposed use will generate between
9, 070 and 34 ,030 average daily trips and between
1 ,250 and 3,970 trips during the evening peak hours.
J. ENVIRONMENTAL ASS;:.SSMENT/21 I: O;:I OLD ll➢E`Zc TIO1 1:
Pursuant to the City of Renton' s Environmental Ordinance
and the State Environmental Policy Act of 1971, as amended,
RCW 43-21C, an Environmental Impact Statement was prepared
for the subject proposal in 1982. The Environmental
Review Committee imposed additional mitigating measures,
dated May 28, 1982. (Copy attached)
K. AGERCgES/IIDEPA 2MENTS CONTACTED:
1 . City of Renton Building & Zoning Department.
2. City of Renton Design Engineering Division.
3. City of Renton Traffic Engineering Division..
4. City of Renton Utilities Division.
5. City of Renton Fire Prevention Bureau.
6. City of Renton Parks & Recreation Department.
7. City of Renton Policy Development Department.
PRELIMINARY REP(. TO THE 'HEARING EXAMINER r `
ALTERRA CORPORATION
JUNE 15, 1982
PAGE FOUR
•
L. DEPARTMENT ANALYSIS:
1 . The subject site was annexed to the City in 1959 ,
at which time the present zoning of "G" General
Use Classification was applied. . The property ' has
not been considered except in the Green River Compreh-
ensive Plan since the time of annexation. Thus,
this would appear to comply with Section
4-301•4 (C) (1 ) (a) of the Land Use Hearing Examiner
Ordinance.
2, In 1979, Ordinance #3344 rezoned the adjacent property
to the south, commonly known as the Earlington
Golf Course from "G" General Use to M-P, Manufacturing
Park.. Development of that 90+ acre parcel..has
not occurred. Further to the south and east Earlington
Industrial Parks #1 and #2 were developed in the
late 1960 ' s after being rezoned in 1966 to manufactur-
ing park by Ordinances 2237 and 2205 . This would
appear to comply with the third criteria under
Section 4-3014 (C) (1 ) (c) that states that the subject •
property has undergone significant and material
change as a result of other public and private
developments in the area.
3. The applicant on May 25, 1982, modified the basic
application by specifically submitting a revised
site plan along with 14 qualifications (copy attached) .
In actuality these are more of design qualifications
which would be reviewed at the time of site plan
approval and should not be included in the rezone
except for the necessary dedications for storm
water storage and natural areas.
4. The Environmental Review Committee on May 26th
imposed additional conditions to mitigate or avoid
adverse impacts from the proposal under Section
4-2810 (C) of the City of Renton Environmental Ordinance
(copy attached) . Specifically, they required prior
to second reading of any ordinance rezoning the
subject property, the property owner shall
a. Dedicate in perpetuity for storm drainage
purposes the entire area identified in the
Soil Conservation Service P-1 Project as a
forebay ponding.
b. Dedicate in perpetuity for wildlife and natural
vegetation mitigation purposes that 3. 5 acre
area illustrated for dedication to the City
of Renton on the applicant' s revised site
plan.
c. Preserve in perpetuity by restrictive covenant
running with the land for additional wildlife
and natural vegetation mitigation an area
of 8.5+ acres parallel to and contiguous with
the dedicated 3. 5+ acre dedication. In addition,
the ERC required that any development of the
subject property shall maintain the current
one hundred year flood storage volume of water
surface elevation of 17. 1 feet msl (equivalent
• to future conditions with 400 cfs maximum
discharge) .
•
• PRELIMINARY REPORT THE HEARING EXAMINER
•
ALTERRA CORPORATION'
JUNE 15, 1982
PAGE FIVE
The ERC specifically denotes that future environmental
review of total building floor area and type established
will be considered as separate projects and not
included in the environmental review for the rezone.
Review at that time shall specifically look at
the adequacy of (1 ) transportation access, (2)
fire response, and1 (3) water and sewer utilities.
With the further condition that any capital improvements
required to implement adequate public services
shall be the sole initial responsibility of the
developer with any latecomer provisions provided
by local ordinance' shall apply.
5. The proposal as originally submitted to rezone
the 71 . 16 acres to manufacturing park would allow
a greater development potential than that modified
by the letter of May 25th. The ERC has limited
the project to a further degree by the conditions
imposed. However, it should be pointed out that
the property is still developable under those con-
ditions. It may require substantial design modifica-
tions to include buildings located on pilings and
additional storm water storage areas for the increased
surface water runoff from the site. The conditions
imposed by the Environmental Review Committee were
based upon the environmental impact statement and
the goals and policies of the Comprehensive Plan
and Green River Plan.
6. Even though the subject proposal complies with
the Comprehensive Plan designation of Manufacturing
Park, it does not specifically comply with the
intent of the goals and policies. The primary
issue revolves around the flood water storage on
the subject site. At the present time, the site
is a natural flood water storage area for the Eastside
Water Project of the Green River Valley. Under
the goals and policies established by the City
in 1980 under the Balanced Development Objective,
it states, "Urban development should be permitted
when it is compatible with the natural and human
environment. " It is a fact that the area serves
as a necessary natural environment along with its
flood storage capabilities.
Under the policies established for open spaces
(1 .C. 1 and 2) , "existing open space that serves •
a public purpose should be retained and made available
for a variety of open space uses. " The public
purpose and use of this open space is for flood
water storage. The policies go further to state,
"Natural vegetation', ravines, slopes, and water
bodies should be preserved to retain open space. "
This is supported by the wildlife policies #1 and
#2, which state, "Desirable natural vegetation
should be retained wherever possible. " and furthermore,
"An unique and/or fragile areas desirable natural
vegetation should be retained or enhanced. "
The Environmental Review Committfee' s requirement
of an additional 8. 5 acres in open space is specifically
correlated to the primary location of a major portion
of the riparian forest. Many large trees measuring
in excess of six feet in diameter will be saved
by inclusion of this 8. 5 acre area, thus supporting
both the natural wildlife area and the necessary
flood storage issues of the Comprehensive Plan.
PRELIMINARY REP(. TO THE HEARING EXAMINER ' •
ALTERRA CORPORAi1•6A
JUNE 15, 1982
PAGE SIX
Under Section 1 .G. 11 , Policies for Surface Drainage,
it stated, "Storm water should be retained on site
and then released at a natural rate and quality. --
. The •City storm drainage system should be designed
to incorporate natural drainage features. " . The
Black River Channel was originally the outlet for
Lake Washington. With changes in the lake level
• at the early part of this century, the Black River
Channel' s function was changed. However, it retained
its flood storage capacity and natural environment
as a result of water coming in from the south out
of the Green River Basin. Inclusion of this natural
area as part of the storm water storage area would
support this policy. Policy 1 .H. 5. also supports
non-development of the subject site by stating
"Selected marshes, bogs and swamps should be preserved
and enhanced. "
All of the issues focus upon the policies established
under the Flood Plain Objective, 1 . I. , of the Goals
and Policies of the City of Renton- Comprehensive
Plan. It specifically states its objective as
"to protect life and property and provide open
.space floodplains' should be preserved and enhanced. "
The Policies state, (1 ) "Land uses within floodplains
should be limited to those not harmed by flooding. " ;
(2) "Land uses should not cause backwater or increase
the velocity of water. " ; and (3) "Fill should be
allowed only when alternatives of design and location
are not available. " The Environmental Review Committee' s
conditions require the present on site flood storage
cpacities to be maintained. Increased surface
water run off will have to be provided per the
final EIS and ERC decision.
7. The Green River Comprehensive Plan supports the
above goals and policies of the general Comprehensive
Plan for the City of Renton. At the original time
of implementation of that plan in 1976, its goals
included the preservation' and/or enhancement of
wildlife habitat. This is definitely an area of
major wildlife significance. Under the Valley
Objectives, Land Use, it states that "Certain areas
should be retained in their natural state to meet
U. S. Soil Conservation Service requirements and
community needs for mitigation of wildlife habitat
and open space. " In addition, greenbelts should
be expanded into suitable areas.. The landscaping
and open space objectives suggest that large areas
should be permanently reserved and maintained for
wildlife habitat and wherever feasible unique natural
features should be incorporated into the development
plans to preserve the character of the Valley.
Concern was stated over premature expansion of
industrial activities. In the past we have seen
large tracts filled and nothing developed on them.
The policy states fairly clearly that "Areas set
aside for future expansion should remain in the
' original state or rehabiltated to support wildlife
until expansion is needed. "
•
• • PRELIMINARY REPORT ' I'HE HEARING EXAMINER
ALTERRA CORPORATION
JUNE 15, 1982
PAGE SEVEN
•
8. A unique and perplexing situation arises in that
the applicant is proposing dedication of major
portion of the forebay necessary for the development
of the Eastside Watershed Project to support the
City into granting the rezone. However, granting
of the rezone should not be predicated solely upon
this issue. Benefit to the general public of zoning
and developing the subject site must be fully weighed.
9. The fourth criteria that must be evaluated in any
rezone process is a question of timeliness. The
applicant has not demonstrated either in the application
or in the disclosure through the environmental
impact statement that rezoning the subject site
is warranted at this time. In fact, on page 68
of the final EIS under comment #7, the data shows
that the City of Renton presently has a surplus
of property zoned Manufacturing Park. Some of
the estimated +1 , 000 acres of potentially zoned
property has been developed, however, under recent
rates of industrial development there are sufficient
areas for industrial expansion for many years.
Based upon past performance of industrial sites
with rail access, it should be pointed out that.
very little development has occurred in the Glacier
Park development in the southern portion of the
Valley floor during the last 4 years. In fact,
the preliminary market for the adjacent Washington
Technical Center suggests that rail access demand
is very low, and the site plans now on file have
eliminated the rail access.
10. At the present time the FEMA, Federal Emergency
Management Association., is recalculating the storm
water drainage system for the Black River basin.
Without specific data any development or approval
of any rezone of the subject site at this time
would be premature. Once the FEMA flood hazard
study is complete the City will ,be able to more
precisely determine the development potential of
the subject site.
11 . The applicant has not shown either the precedent
or the timeliness of the proposed rezone. The
primary issue of storm water storage is insurmountable
and in itself would suggest denial. However, adding
to this the fact the City has extensive property
presently zoned manufacturing park that' is undeveloped.
and without active economic indicators that would
suggest potential development within the near future,
it would appear that the application .is similar
to those approved in the 1960' s which were not
developed for extensive periods of time and is
inappropriate and untimely.
M. DPPM E1 iTAiL; !$( DATION
Based upon the above analysis, it is recommended that
the rezone request by Alterra Corporation, R-129-80,
be dismissed without prejudice and reheard when the
FEMA study is complete.
•
L • .
I , r , EgTlHZ `' � O` t
\ o.` _
r . • r ` 1e '1161
Wit . • t y'�I
i N/G� • INN • �� i),;„i 1, \ per,'`
•
i SR,gam i, ��� .. �., � �Iff ..�' .
. . _. .
,, ,,
,,..;4 4• ...1, -
. S' 1 '. E 4T -. :-.. • I ., , tXtlir$0.774'10 It
,,,...__' . # atip •107. .....,_!'ei.‘.1 l',o4.,„......„:e iii
• 1 a i t oil"'
t•' +. .,•„t ,�,wrr,.^(<[�•r ��.GG.•'Y � f�' ;r�, �,f��# Ir1I1���.
' 1 .. . , : __...,.. .:, '7' ,,,,r- .. . ,. Nimliliiiiiiitt!.;.•,...47,' Ili/4
'1111111— . ''''' '''> .1 -.1ite...1"1: ill„„r.ikteizAw
Pi.51 . .. git‘ISIIR.,. P....1.'' .ffe
' '-'C-•)i''i 'fl,D I) .',f`' r II 1 c f . ' . : ' if : 4,1 ' , \ . • • • 4144.'4..,._1;ii9.'*-1.-*:-'f:7$ ;
.\ 4 , %. IN.. it , 4 , 1 5,,,1144,,, ,,:.....
1, r , •,•! ►x
• it',WP..`,\1:1?A I .1
/ 1 �'l I S t
rill -• 4--- / __P_•: '
\r ,'' \, � _ N........•\.
• •t• �J..•• _•Syr �� t 1
lWj A
• , 1 I 1 , I a.J•. • `• ` S 1
1 :>: 1 • ' M F T R \ 1 . 1 •
=c�..+ .+ ;�;•;�
•
•
•
•
♦ •
•
REZONE: ALTERRA CORPORATION, File R-129-80
•
•
APPLICANT Alterra Corporation • TOTAL AREA ±71 acres •
PRINCIPAL ACCESS Via S.W. 7th and Powell Ave. S.W. extension
EXISTING ZONING G-1, General Classification District
•
EXISTING USE Reparian Forest
•
PROPOSED USE Future warehouse and office use.
COMPREHENSIVE LAND USE PLAN Manufacturing Park, Greenbelt
COMMENTS
RENTAN BUILDING & ZONING DEV '°TMENT
DEVELOPMENT APPLICATION REVIEW SHEET
ECF - -
APPLICATION NO(S) : REZONE (R-129-80)
PROPONENT: Altera Corporation (Del Bonds)
PROJECT TITLE : Black River Office Park
I
BRIEF DESCRIPTION OF PROJECT: Application to rezone 71.16 acres of property from
1
G-1 to MP for warehouse and office development.
LOCATION : The property is bounded on: the north by the Burlington Northern Railroad right-
of-way, on the east by the Sunpointe Condominiums, on the south by the former Earlington
Golt Course and on the west by Monster Road and The r-I pumping sLarion.
TO: •
I
Ei PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE :
. 0 ENGINEERING DIVISION •
El TRAFFIC ENG. DIVISION SCHEDULED HEARING DATE : 6-15-82
EI UTILITIES ENG . DIVISION
0 FIRE PREVENTION BUREAU
El PARKS & RECREATION DEPARTMENT
El BUILDING &. ZONING DEPARTMENT:
POLICE DEPARTMENT
POLICY DEVELOPMENT DEPARTMENT
Ei OTHERS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING. PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5:00 P.M. ON
REVIEWING DEPARTMENT/DIVISION : )( hea.,,,/
0 APPROVED 0 APPROVED WIT CONDITIONS 0 NOT APPROVED
©4‘ "ems // % i/ /%/d *0 A . ' a
S ? a/A e,t- 4// 0-eeta / ,Wei./ 7we, -,,..
&e?4i - 2i ¢;l
/,04 ,f - iew, 5 _ /.4110k7/ 4
66 f. ,WeoV exareptar-•
/ " ./ i , L• . ./4 .i.w J%, .41
C) zret 12 a 4� 7 r g746/y//c am/ 447ege ice
74; 1 7cote,- o W
(raitai- DATE: We45�
SIGNA F IRECTOR OR AUTHORIZED REPRESENTATIVE
REVISION 6/1982
PC'ITON BUILDING & ZONING 'PARTMENT • , .
DEVELOPMENT APPLICATION REVIEW SHEET
ECF — —
APPLICATION NO(S) : REZONE (R-129-80)
PROPONENT: Altera Corporation (Del Bonds)
PROJECT TITLE : Black River Office Park
BRIEF DESCRIPTION OF PROJECT: Application to rezone 71.16 acres of property from
G-1 to MP for warehouse and office development.
LOCATION : The property is bounded on the north by the Burlington Northern Railroad right-
of-way, on the east by the Sunpointe Condominiums, on the south by the former Earlington
Colt Course and op the west by Monster Koaa ana the r-1 pumpipg sLation.
TO :
El PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE :
ENGINEERING DIVISION
El TRAFFIC ENG . DIVISION SCHEDULED HEARING DATE : 6-15-82
UTILITIES ENG . DIVISION
OFIRE PREVENTION BUREAU
OPARKS & RECREATION DEPARTMENT
BUILDING & ZONING DEPARTMENT
• POLICE DEPARTMENT
POLICY DEVELOPMENT DEPARTMENT'
OTHERS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING. PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5:00 P.M. ON
REVIEWING DEPARTMENT/DIVISION :
APPROVED IS APPROVED WITH CONDITIONS • NOT APPROVED
jt_ • ,tG' CCLeC c c G' .� c�—.l, ���_� C:(tC � //L �, �, � GLi-L�^�(��i r-1
G' f.�wx�J�CJ
i rt
—1 Z., �� �C
l - DATE ; G ,r z
SIGNATURE OF DIRECTOR OR AUTHORIZED REPRESENTATIVE
REVISION 5/1982
•
•
HAGGARD, TOUSLEY & BRAIN
ATTORNEYS AND COUNSELORS AT LAW
RUSSELL F.TOUSLEY 1700 DAON BUILDING
JOEL E.HAGGARD 720 OLIVE WAY
CHRISTOPHER I.BRAIN
SEATTLE,WASHINGTON 98101 TELECOPIER
WILLIAM N. SNELL (206)624-5299 (206) 624-8959
WILLIAM H. BLOCK
MICHAEL G. FULBRIGHT -
KIM D.STEPHENS
OUR FILE NO:
May 25, 1982
N-15004
Mr . Roger Blaylock
City of Renton
Building and Zoning Dept .
200 Mill Avenue South
Renton, Washington 98055 .
Dear Roger :
The applicant incorporates the following
conditions into its rezone proposal and agrees that the
following may be made conditions on the requested zoning
classification, subject to the qualification below.
1. Areas to be developed shall be limited to
those areas identified on the site plan delivered to the
City on May 21, 1982 (Exhibit in the record of the
hearing) .
2 . The maximum gross square footage of building
to be allowed on the property is 995,781 .5 square feet .
3 . The about 9. 14 acre acre designated on the •
site plan (Exhibit ) as "Soil Conservation Service"
shall be given as a charitable donation to the City of
Renton or King County for.; use solely for the P-1 Channel
and associated facilities.
4 . The about 3 .91 acres areas designated on the
site plan (Exhibit ) as "City of Renton" and the about
6 .61 acre area designated on the site plan (Exhibit )
as "Preserve" shall not have any buildings constructed
within their boundaries.
NOTE: The site plan designated Exhibit is
intended to identify approximate boundaries between areas
of the site and are not actual boundaries_._
•
5 . Storm water collected on the site shall be
handled in accord with applicable City code requirements,
provided that there shall be no detention requirement for
storm water . CITY OF RENTON
D1/
SOdL �
ray 2 51982
BUILDING/ZONING DEPT.
-a i� f :
•
Mr . Roger .Blaylock
May 25, 1982
Page 2
6 . All structures constructed on the subject
property shall be flood-proofed ( if required) in accord
with RCC 4-736 .
7. The storm water transmissions system shall be
placed underground.
8 . The Major Roadway (32 feet from curb to curb)
as designated on the site plan (Exhibit ) shall be
located within an 80 foot right of way, the general
location of which is shown on Exhibit The actual
location of such Major Roadway may vary and be relocated
when building permits are sought . The major roadway will
be constructed to City standards for , and dedicated to the
City as, public roads . Should the entire Major Roadway
not be constructed at one time, temporary turn arounds to
assure fire access shall be provided.
9 . Water utilities are to be installed per City
plans and shall provide for adequate fire flow and
hydrants.
10 . All utilities shall be underground where
feasible. and- reasonable and. shall. be.- installed at owners
expense per approved City plans.
11 . No added open space beyond that shown on the
site plan (Exhibit ) shall be required except that
associated with parking lot interior landscaping as
required by City code, insofar as the areas designated as
"Soil Conservation Service, " "City of Renton" and
"Preserve" are to be kept in open space.
12 . Crime prevention measures based upon
consultation with the City' s Police Department will be
incorporated as reasonable in development design.
13 . Internal ( i .e. , non major ) roads shall
adequately provide for Fire Department emergency
response.
14. Prior to the issuance of any building permit
for any building on the property, a building specific
traffic analysis shall be done. Traffic resulting from
the building shall not directly and- solely cause-- a LOS Y of fEr1TON
[E
equal to or worse than E at the intersections of n w 1
I
MAY k, 5 I;nn'
BUILDING/ZONING DEPT.
1
Mr . Roger Blaylock
May 25, 1982
Page 3
and Grady, Grady and Rainier and Interurban and West
Valley Highway. If such LOS level directly occurs due to
development traffic from subject property, off-site
improvements or on-site changes in development may be
necessitated.
The above conditions are considered as a package
and are offered without prejudice to any rights applicant
may have under applicable law or may have under Secton 5
of Engrossed Senate Bill #4972 (effective July 1 , 1982 ) .
Sincerely yours,
HAGGARD, OUSLE & BRAIN
/77?-'1"-
' el Haggar
JEH/ag
4862B
Enclosures
cc: Mr . Del Bonds
Mr . Ron Neubauer
Mr . Mike Hunsinger
CIY OF RENTON
ljdU0111 'fi
D
NAY 2 5 182
BUILDING/ZONING DEPT.
•
h., gib'0, z` - BUILDING & ZONING DEPARTMENT
•
Z a,IL
RONALD G. NELSON - DIRECTOR
Op a Qr" MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH. 98055 © 235-2540
AO9�TF� SEP11'M��Q, j -
May 28, 1982 •
BARBARA Y. SHINPOCH
MAYOR •
Mr. Del Bonds CERTIFIED MAIL
Alterra Corporation #115515
P.O. Box 66101 RETURN RECEIPT REQUESTED
Seattle, WA 98166
SUBJECT: BLACK RIVER OFFICE PARK/FILE R-129-80
Dear Mr. Bonds:
The Environmental Review Committee has reviewed the comments obtained from the
above referenced Final Environmental Impact Statement. Based upon this report, the
Committee imposes the following conditions necessary to mitigate the adverse impacts
of the proposal:
1. Prior to second reading of any ordinance rezoning the subject property, the
property owner shall (see Exhibit "A" attached):
a. Dedicate in perpetuity for storm drainage purposes that area identified in
the SCS P-1 project as the forebay pending area, and;
b. Dedicate in perpetuity for wildlife and natural vegetation mitigation
purposes that 3.5+ acre area illustrated for dedication to the City of
Renton;
•
c. Preserve in perpetuity byi restrictive covenant running with the land for
additional wildlife and natural vegetation mitigation an area of 8.5 +
acres parallel to and contiguous with the dedication specified in
paragraph 1-b above.
2. Any development of the subject property shall maintain the current one hundred
(100) year flood storage volume 'to a water surface elevation of 17.1 feet MSL
(equivalent to future conditions, with 400 cfs maximum discharge - Table 1,
page 6, Appendix D, FEIS).
3. Any future development of the subject property shall be subject to further
specific environmental review with total building floor area and type established
upon the following criteria:
•
•
•
a MR. DEL BONDS '
BLACK RIVER OFFICE 1•-r cK/FILE R-129-80
MAY 28, 1982.
PAGE TWO
a. • Adequacy of transportation access. Any intersection impacted by the
proposed development if above LOS-C shall not.fall below LOS-C. If this
happens the developer.shall make such improvement to return to LOS-C.
Any intersection below LOS-C prior to development shall be maintained
at its present LOS by improvements by the developer. If the intersection
is presently below 1.0 V/C the developer shall make any improvements to
insure the existing V/C ratio.
b. Adequacy of fire response. The applicant shall demonstrate how a
satisfactory response time can be established for fire apparatus.
c. Adequacy of water and sewer utilities. Water and sewer systems shall
be established at such size capacity, and location to meet the
requirements of. the buildable area established by 3a and 3b above and
the Utilities Comprehensive Plan.
4. The cost of any capital improvements required to implement paragraph 3 above
shall be the sole initial responsibility of the developer. Any late corner
provisions provided by local ordinance shall apply.
Very truly yours,
Ronald G. Nelson
D emens
Building & Zoning. Director Policy Development Director
ichard C. Houghton
Public Works Director
cc: Mr. Joel Haggard
14— —
'../A-
•
• •
�� I� \1k\ 1h � ��
\ o
•
• I1ti` \ / I,.\ , _ IS
l hea / '\\ \�� \ �`\\.� 7
j
11,
'�
1,IIII
•
•
/iill
` / - \ ' •
/ 4111oH' `;
Y<{ qo\ !,• .} 1� till ,\
Cr•
Co
/
•
•
•
/.- \ \ � //
I\ / • ` I,
`j \\‘‘\r i
•
•
.,, : .40
`//�j' . i, II ;%i:,///
fi t I I �, 1\ 1\ 1 r
it
11\`• ' ti`` .1\ `\ , (i"
.•`.. ‘\\ , %' / ,
. % \\\2‘.....', .•,,••• 4000.7 '' •
\ \ \ !
a j 1 /
• _ ♦ ' , 1,1
REN N BUILDING & ZONING DE, aTMENT
DEVELOPMENT APPLICATION REVIEW SHEET
ECF - -
APPLICATION NO(S) : REZONE (R-129-80)
PROPONENT : Altera Corporation (Del (Bonds}
PROJECT TITLE : Black River Office park
BRIEF DESCRIPTION OF PROJECT: Application to rezone 71.16 acres of property from
G-1. to MP for warehouse and office development.
LOCATION: The property is bounded on the north by the Burlington Northern Railroad right-
of-way, on the east by the Sunpointe Condominiums, on the south by the former Earlington
Galt Course and on the west by Monster Koad and the r-I pumping station.
TO: •
0 PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE :
• Lj ENGINEERING DIVISION
TRAFFIC ENG. DIVISION SCHEDULED HEARING DATE : 6-15-82
OUTILITIES ENG . DIVISION
0 FIRE PREVENTION BUREAU
EIPARKS & RECREATION DEPARTMENT
EIBUILDING & ZONING DEPARTMENT.
OPOLICE DEPARTMENT,
OPOLICY DEVELOPMENT DEPARTMENT
DOTHERS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING . PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5:00 P .M. ON
REVIEWING DEPARTMENT/DIVISION :
DAPPROVED JJAPPROVEDwITH CONDITIONS 0 NOT APPROVED
Conditions: ( ,,6_,t,
Prepare a detailed traffic analysis for the proposed development with the boundaries
being Sunset on the north, Rainier on the east, 405 on the south and Valley Parkway
on the west side.
If the analysis shows that any of the intersections within those boundaries are
impacted and puts the intersection at a level of service C or below, they make any
improvements necessary to maintain the LOS that existed prior to their development.
If the existing LOS is above LOS C, they will make improvements required to keep the
intersection at LOS C.
SI ATURE OF DIRECT OR AUTHORIZED REPRESENTATIVEATE, —2"
RX-it9TON BUILDING & ZONING F ?ARTMENT
DEVELOPMENT APPLICATION REVIEW SHEET
ECF -
APPLICATION NO(S) : REZONE (R-129-80)
PROPONENT: Altera Corporation (Del Bonds)
PROJECT TITLE : Black River Office Park
BRIEF DESCRIPTION OF PROJECT: Application to rezone 71.16 acres of property from
G-1 to MP for warehouse and office development.
LOCATION: The property is bounded on the north by the Burlington Northern Railroad right-
,
of-way, on the east by the Sunpointe Condominiums, on the south by the former Earlington
Gott Course and on the west by Monster Road and cne r-I pumpIng stacio
TO: •
PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE :
• El ENGINEERING DIVISION •
El TRAFFIC ENG. DIVISION SCHEDULED HEARING DATE : 6-15-82
/� UTILITIES ENG . DIVISION
El FIRE PREVENTION BUREAU
El PARKS & RECREATION DEPARTMENT
BUILDING & ZONING DEPARTMENT
POLICE DEPARTMENT
El POLICY DEVELOPMENT DEPARTMENT
OTHERS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING . PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT •
BY 5:00 P.M. ON
REVIEWING DEPARTMENT/DIVISION :
® APPROVED APPROVED WITH CONDITIONS ❑ NOT APPROVED
y
Ct•L<�% ,! -� G'z=Li.SL,i lc�,`�( � C_
—L.G�!—!=7, :�i:i-'l�- )-t..c-.2-/` �..(.-iL•-,/L.i� G �.G--•�-•—c-K a_ - -!-�.c i�.`
-• -7 Ara.:( .. ,L-, c(l,f'
(' t �:�r t�. E DATE: - 2
SIGNATURE OF DIRECTOR," OR AUTHORIZED REPRESENTATIVE
REVISION 5/1982
.- • REN -.N BUILDING & ZONING DE1 'TMENT
DEVELOPMENT APPLICATION REVIEW SHEET
ECF - -
APPLICATION NO(S) : REZONE (R-129-80)
PROPONENT : Altera Corporation (Del Bonds)
PROJECT TITLE : Black River Office Park
BRIEF DESCRIPTION OF PROJECT: Application to rezone 71.16 acres of property from
G-1 to MP for warehouse and office development.
LOCATION : The property is bounded onjthe north by the Burlington Northern Railroad right-
of-way, on the east by the Sunpointe Condominiums, on the south by the former Earlington
Golt Course and on the west by Monster Koaa ana the r-I pumping station.
TO: •
0 PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE:
El ENGINEERING DIVISION
TRAFFIC ENG. DIVISION SCHEDULED HEARING DATE: 6-15-82
Ei UTILITIES ENG . DIVISION'
FIRE' PREVENTION BUREAU
El PARKS & RECREATION DEPARTMENT
BUILDING & ZONING DEPARTMENT' •
El POLICE DEPARTMENT
POLICY DEVELOPMENT DEPARTMENT
OTHERS :
COMMENTS OR SUGGESTIONS REGARDINGITHIS APPLICATION SHOULD BE PROVIDED
IN WRITING. PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5:00 P.M. ON
REVIEWING DEPARTMENT/DIVISION : C--b
APPROVED EjAPPROVED :WITFI CONDITIONS 0 NOT APPROVED
-7:-,J12 2-
SIGN OF DIRECTOR AUTHORIZED REPRESE .IVEATE.
PI PITON BUILDING & ZONING V 4ARTMENT
L_
DEVELOPMENT APPLICATION REVIEW SHEET
ECF - -
APPLICATION NO(S) : REZONE (R-129-80)
PROPONENT : Altera Corporation (Del Bonds)
PROJECT TITLE : Black River Office Park
BRIEF DESCRIPTION OF PROJECT: Application to rezone 71.16 acres of property from
G-1 to MP for warehouse and office development.
LOCATION : The property is bounded on the north by the Burlington Northern Railroad right-
of-way, on the east by the Sunpointe Condominiums, on the south by the former Earlington
0 u orse an on the west by Monster Road and Lne r-2 pumping scacion.
TO: • •
0 PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE :
. 0 ENGINEERING DIVISION •
0 TRAFFIC ENG , DIVISION SCHEDULED HEARING DATE : 6-15-82
0 UTILITIES ENG , DIVISION
INFIRE PREVENTION BUREAU
PARKS & RECREATION DEPARTMENT
Ei BUILDING & ZONING DEPARTMENT
0 POLICE DEPARTMENT
El POLICY DEVELOPMENT DEPARTMENT
0 OTHERS :
•
COMMENTS ,OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING. PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT '
BY 5:00 P .M. ON
REVIEWING DEPARTMENT/DIVISION : t-7/L49
151 APPROVED 0 APPROVED WITH CONDITIONS n NOT APPROVED
.,eg axe /r 'y .,off g,' X
(it---41Z„In -0 . -e,0- ,1_.,,t-e-e.:Z)
, . r .?„....1 ,,„
„„„„ ,,...c ,<_,..‹, _
DATE: '- 7-1Z _
SIGNA LIRE F D RECTOR OR AUTHORIZED REPRESENTATIVE
REVISION 5/1982
•
JAG:
JAG-RENTON ASSOCIATES,
' a Washingto general partry ship
B
y
• Ronald G. Neu er
General Partne
b
6i,_et
By h"-r•_
Delton J. Bonds
cGeneral Partner
O
By L.
y enneth L. Thompso
General Partner
•
By miz./. .„,
Meton Cohen
General Partner
HANSEN:
•
JOHN 0. HANSEN, INC.
a Washington corporation
1
r
• By <. � -
19a- - CA-2 •Iit'14
P -
e
STATE OF WASHINGTON )
, ) ss.
COUNTY OF KING )
On this day personally, appeared before me Barbara
Y. Shinpoch and Maxine E. Motor
to me known to be
the Mayor and City Clerk
respectively, of the City of Renton, the municipal
corporation that executed the within and foregoing
instrument, and acknowledged :-the said instrument to be the
free and voluntary act, and deed of said corporation for
the uses and purposes therein mentioned, and on oath
stated that he was authorized to execute said instrument,
and that the seal affixed is the corporate seal of said
corporation.
Given under my hand and official seal this 29th
day of December , 1982.
• Notary Public in 'ail• '.fo'rf�t•h'e. '
State of Washix oq,_re`s•$ei•ng
at �evOco�+ = .- w ;.
•
12/17/82
77928 5 �. • ,�� .. •• ,�•�
'•,
STATE OF WASHINGTON )
ss.
COUNTY OF KING )
On this day personally appeared before me Ronald
G. Neubauer, to me known to be a General Partner, of
RENTON PROPERTY ASSOCIATES, the partnership that executed
the within and foregoing instrument, and acknowledged the
said instrument to bethe free and Voluntary act and deed
of said 'corporation for the uses and purposes therein
mentioned, and on oath stated that he was authorized to
execute said instrument .
Given under my hand and official seal this MIN.,
0 day of ,�,�..� ; 1982.
C:$ a3-s, ad,a' c)
c ) Sma Public in and for t•he • .
ote Washi gton, resi �.n ;' `
OD at
STATE OF WASHINGTON )
ss.
COUNTY OF KING )
On this day personally appeared before me Delton
J. Bonds, to me known to be a General Partner, of RENTON
PROPERTY ASSOCIATES, the partnership that executed the
within and foregoing instrument, and acknowledged the said
instrument to be the free and voluntary act and deed of
said corporation for the uses and purposes therein
mentioned, and on oath stated that he was authorized to
execute said instrument .
Given under my hand and official seal this kl,
day of , 1982.
No r Public in and for th'e
St to Washington, residing. '
at
•71f01 �� ;.
s � .... •�L'i••
•�,L. , t ." •.'•
•
12/17/82 •
7792B 6
STATE OF WASHINGTON )
ss.
COUNTY OF KING ! )
On this day personally appeared before me Kenneth
L. Thompson, to me known to be a General Partner, of
RENTON PROPERTY ASSOCIATES, the partnership that executed
the within and foregoing instrument, and acknowledged the '
said instrument to be the free and voluntary act and deed
of said corporation for the uses and purposes therein
mentioned, and on oath stated that he was authorized to
execute said instrument .
•
Given under my hand and official seal this .. f% . ", y
day of , 1982. �
Notary Public in and- fo'r:•;te"''` ' ti,•
State)of 1Washingt//jjo''n, res'i'd'dc '•'� `„
OD at r. i/f///f////
jJ Q.
STATE OF WASHINGTON )
ss.
COUNTY OF KING )
On this day personally appeared before me Merton
Cohen, to me known to be a General Partner, of RENTON
PROPERTY ASSOCIATES, the partnership that executed the
within and foregoing instrument, and acknowledged the said
instrument to be the free and voluntary act and deed of
said corporation for the uses and purposes therein
mentioned, and on oath stated that he was authorized to
execute said instrument .
Given under my hand and official seal this .,2C,
day of 2) i;(J , 1982.
Notary Public in and for :the'•'•,,,r,�:
State pf Vps/lington, resi•a��ng�, l• �:
•
12/17/82 .
7792E 7 •
is
STATE OF WASHINGTON )
) ss .
COUNTY OF KING • )
On this day personally appeared before me Ronald
G. Neubauer, to me knovin to be a General Partner, of
JAG-RENTON ASSOCIATES, the partnership that executed the
within and foregoing instrument, and acknowledged the said
instrument to be the free and voluntary act and deed of
said corporation for the uses and purposes therein
mentioned, and on oath stated that he was authorized to •
execute said instrument. • ' •
•
•
Given un9fer my hand and official seal this `-"
day o /,f h�•L•�.� .ti982. �..
,J
it V .• {i
T.1 Not y P,ubl is in 'a d for the
Q
S to f ,Wriitonn , residing
..
•
STATE OF WASHINGTON . . )
) ss.
COUNTY OF KING )
On this day personally appeared before me Delton
J. Bonds, to me known to be a General Partner, of
JAG-RENTON ASSOCIATES, the partnership that executed the
within and foregoing instrument, and acknowledged the said
instrument to be the free and voluntary act and deed of •
said corporation for the uses and purposes therein
mentioned, and on oath stated that he was authorized to
execute said instrument .
Age
upder my hand and official seal this d
rc
day of ,CZ4+f4h-c - , 1982.
v j k,,� ca it 1 .
No r Public ia� d for the:`"' '9 • f F..
State owl sh n, resi•cd�. L. . ,1,`,�-r.1 c
at •
1
12/17/82
7792E • 8 •
• V
STATE OF WASHINGTON ; )
) ss.
COUNTY OF KING )
On this day personally appeared before me Kenneth
L. Thompson, to me known to be a General Partner, of
JAG-RENTON ASSOCIATES, the partnership that executed the
within and foregoing instrument, and acknowledged the said
instrument to be the free and voluntary act and deed of
said corporation for the uses and purposes therein
mentioned, and on oath stated that he was authorized to
execute said instrument.
Give under my hand and official seal this
day of 1��VC'. , 1982.
•
4-1 Notary Public `in and for ,.•tY�e„ ,
State of Wasihington, residing •• •.•vo
c at /"/,'/ `- //-/%/) 3 gip, 4 �. •�,,:• •
1
STATE OF WASHINGTON )
ss.
COUNTY OF KING )
On this day personally appeared before me Merton
Cohen, to me known to be a General Partner, of JAG-RENTON
ASSOCIATES, the partnership that executed the within and
foregoing instrument, and acknowledged the said instrument
to be the free and voluntary act and deed of said
corporation for the uses and purposes therein mentioned,
and on oath stated that he was authorized to execute said
instrument.
given uq,der my hand and official seal this `"
day of (.('' '11/"- i✓, 1982.
ary Public ' n i nd for the,' „ G •;i. ••y=
Stat 0521 h ton, residin <<,
g,} '�;f ,,, '• Y;'.
at Gl� . •• ?V o:
• (� : �r,� p
-! Gi L i zo;).
•
•
12/17/82
7792B 9 .
•
STATE OF WASHINGTON )
) ss .
COUNTY OF KING )
On this day personally appeared before me % ` �,
!; //L,�. 4e it and
, to me known to be
the y^,; ; d e, t and
respectively, of JOHN B. HANSEN, INC. , the corporation
that executed the within and foregoing instrument, and
acknowledged the said instrument to be the free and
voluntary act and deed of said corporation for the uses
and purposes therein mentioned, and on oath stated that he
was authorized to execute said instrument, and that the
seal affixed is the corporate seal of said corporation.
Given under my hand and official seal this
day of / c.e— A e r ' , 1982.
0
7-1
Notary Public in and for the
°\ Noy• ` T . State�of ashington, residing
/'
' at c,r/.
• PA
Q ! 1
.f tt I"'%,,•r .'
STATE OF WASHINGTON )
ss .
COUNTY OF KING )
On this day personally appeared before me Jeanne B.
Hansen to me known to be Secretary-Treasurer of JOHN R. HANSEN,
INC. , the corporation that executed the within and foregoing
instrument, and acknowledged the said instrument to be the free
and voluntary act and deed of said corporation for the uses and
purposes therein mentioned, and on oath stated that she was
authorized to execute said instrument, and that the seal affixed
is the corporate seal of said corporation.
Given under my hand and official seal this 31st day of
December, 1982.
•
�v.
Notary Public in and=fo.x= jhe ,r, .
State of Washington, res�.•'c i tip; •
at King County. '� '',;
•
12/17/82
7792E 10
•
•
• ;, .• . 1 OF 2
•
•
EXHIBIT 1 TO
AGREEMENT •
•
•
PARCEL A:
' THAT PORTION OF THE, SOUTHWEST QUARTER OF
SECT10N .GTON;TOWNSHIP 23 •
. NORTH, RANGE 4 EAST, W.M. IN KINR
AND
THAT PORTION OF ...JUNCTION ADDITION TO CITY OF SEATTLE, ACCORDING TO TI
Crl PLAT RECORDED IN VOLUME 12 OF PLATS, PAGE 75v IN KING COUNTY? '
WASHINGTON, TOGETHER WITH VACATED STREETS ADJOINING WHICH WOULD ATTAI
0 TO SAID PREMISES BY OPERATION OF LAW, AND OF C. E. BROWNELL'S DONATI(
CLAIM NOD 41• AND OF THAT PORTION OF TRACT 264 RENTON SHORE LANDS 2ND
o SUPPLEMENTAL? DESCRIBED AS FOLLOWS: •
BEGINNING AT THE- SOUTH QUARTER CORNER OF SAID SECTION 13; THENCE NORT
00°58'28" EAST ALONG THE NORTH-SOUTH CENTERLINE OF SAID SECTION 13 A
DISTANCE OF 884.84 FEET TO THE SOUTHEAST CORNER OF TRACT 26 OF RENTOi
SHORELANOS SECOND SUPPLEMENTAL MAPS, 1958; THENCE SOUTH 72°37 °52" WES
ALONG THE SOUTH BOUNDARY OF SAID TRACT 26 A DISTANCE OF 382.60 FEET;
THENCE NORTH 70°54'02" WEST ALONG SAID SOUTH BOUNDARY OF TRACT 26 A
DISTANCE. OF• 73:50 FEET. TO THE EAST LINE OF THE CHARLES BRORNELL
DONATION LAND CLAIM NO. 41 AND THE TRUE POINT OF. BEGINNING; THENCE
CONTINUING NORTH 70°54'02" WEST ALONG SAID SOUTH BOUNDARY OF TRACT 26
DISTANCE OF 281.02 FEET; THENCE SOUTH 73°56'O1" WEST ALONG SAID SOUTH
BOUNDARY OF TRACT 26 A DISTANCE OF 130.03 FEET; THENCE SOUTH 41°16'Ol
WEST ALONG SAID SOUTH BOUNDARY OF TRACT 20 A DISTANCE OF 316018 FEET
THE NORTH BOUNDARY OF A TRACT OF LAND DEEDED TO KING COUNTY AND
DESCRIBED UNDER KING COUNTY AUDITOR°S FILE NO0 6607786; THENCE
WESTERLY ALONG SAID NORTH BOUNDARY ON A CURVE TO THE LEFT, THE CENTER
OF WHICH BEARS SOUTH 39°41'39" WEST HAVING A RADIUS OF 627046 FEET AN
• ARC DISTANCE OF 434.70 FEET THROUGH A CENTRAL ANGLE OF 39°41°39"; •
THENCE NORTH A DISTANCE OF 25.00 FEET ALONG SAID NORTH BOUNDARY:
THENCE WEST A DISTANCE OF 280069 FEET ALONG SAID NORTH BOUNDARY;
THENCE SOUTH 59°53°47" WEST ALONG SAID NORTH BOUNDARY A DISTANCE OF
377.52 FEET; • THENCE SOUTH..74°13.°19N_WEST.. ALONG SAID NORTH BOUNDARY A
DISTANCE OF 443.31 FEET TO THE NORTHERLY MARGIN OF THE CHARLES HONSTEF
COUNTY ROAD; THENCE NORTH 34°18'31" WEST ALONG SAID NORTHERLY MARGIN I
DISTANCE OF 43.46 FEET TO' THE SOUTH LINE OF THE BURLINGTON NORTHERN
RAILROAD RIGHT-OF-WAY; THENCE ALONG A CURVE TO THE LEFT, ALONG SAID
SOUTH LINE, THE CENTER OF WHICH BEARS NORTH 06°34'41" WEST HAVING A
RADIUS OF 696.00 FEET, AN; ARC DISTANCE OF 45.43 FEET THROUGH ,A CENTRAM
ANGLE OF 03°44'25" TO A POINT OF COMPOUND CURVE; THENCE ALONG A CURVE
TO THE LEFT, ALONG SAID SOUTH LINE, THE CENTER OF WHICH BEARS NORTH
10°19'O6" WEST HAVING A RADIUS OF 1 ,055.00 FEET, AN ARC DISTANCE OF
209.95 FEET THROUGH A CENTRAL ANGLE OF 11°24'08°' TO A POINT OF COMPOUN
CURVE; THENCE ALONG A CURVE TO THE LEFT, ALONG SAID SOUTH LINE, THE
CENTER OF WHICH BEARS NORTH 21°43'14°' WEST HAVING A RADIUS OF 727.00
. FEET, AN ARC DISTANCE OF 214.77 FEET THROUGH A CENTRAL ANGLE OF
16°55'35" TO A POINT OF COMPOUND CURVE; THENCE ALONG A CURVE TO THE
LEFT, ALONG SAID SOUTH LINE, THE CENTER OF WHICH BEARS NORTH 38°38'49"
•
rr y
• z ur
t•
, c
. WEST HAVING A RADIUS OF 1,571.00 FEET, AN ARC DISTANCE OF 206.57 FEET
THROUGH A CENTRAL ANGLE 'OF O7°32'02°' TO A POINT OF TANGENCY; THENCE
' ' NORTH 43°49'09" EAST ALONG SAID SOUTH LINE A DISTANCE OF 97.17 FEET Ti
A LINE 35 FEET SOUTHERLY1 OF AND PARALLEL WITH THE CENTERLINE OF THE
EXISTING MOST SOUTHERLY TRACK OF THE CHICAGO, MILWAUKEE, ST. PAUL 100
PACIFIC RAILROAD TRACKS; ' THENCE ALONG SAID PARALLEL LINE ON A CURVE T6
THE RIGHT, THE CENTER OF ' WHICH BEARS SOUTH 42°43' 180° EAST HAVING A
RADIUS OF 696.89 FEET, AN ARC DISTANCE OF 40.09 FEET THROUGH A CENTRAL
ANGLE OF 03°17°45"; THENCE NORTH 50°34°27" EAST ALONG SAID PARALLEL
LINE A DISTANCE OF 248.50 FEET; THENCE ALONG SAID PARALLEL LINE ON A
CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH 39°25'33" EAST
HAVING A RADIUS OF 676.58 FEET, AN ARC' DISTANCE OF 93.64 FEET THROU4i
CENTAL ANGLE OF 07°55°47" TO A POINT OF REVERSE CURVE; THENCE ALONG
0) SAID PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS
NORTH 31°29'46" WEST HAVING A RADIUS OF 428.64 FEET, AN ARC. DISTANCE 0
73.32 FEET THROUGH+-A CENTRAL ANGLE OF. 09°48 °0407 TO A POINT OF REVERSE
CURVE; THENCE ALONG SAID PARALLEL LINE ON A CURVE TO THE RIGHT, THE
174 CENTER OF WHICH. BEARS SOUTH 41°17'50" EAST HAVING A RADIUS OF 2,580.74
FEET, AN ARC DISTANCE OF 437.40 FEET THROUGH A CENTRAL ANGLE OF
%.0
09°42°39N TO A POINT OF COMPOUND CURVE; THENCE ALONG SAID PARALLEL LINT
ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH 31°35°11"
EAST HAVING A RADIUS OF 2,790.19 FEET; AN ARC DISTANCE OF 789.44 FEET
THROUGH A CENTRAL ANGLE OF 16°12'39Q' TO THE EAST LINE OF THE CHARLES
BROWNELL DONATION LAND CLAIM NO. 41 ; THENCE SOUTH 01°24°04" WEST ALM
SAID EAST LINE A DISTANCE OF 950.58 FEET TO THE TRUE POINT OF
BEGINNING.
•
•
• •
•
•
•
•
•
'.. 1'..i ••o.i:11f 1 'y xy' yJ Yy :• , y r'.ytY ,VL,+t•0(•; j.F.)i'N ia' t J.3�• ,r: ''y',•, •J'1=,.:"•'1 '•"`1`Y'tA`
1 OF 3
•
•
•
•
EXHIBIT 2 TO
AGREEMENT . •
• •• ...t....... -. .... .
•
•
•
•
•
PARCEL B:
t7
C THAT PORTION OF C. E. BROWNELL°S DONATION CLAIM NOD 41, AND OF THE
o SOUTHWEST QUARTER AND THE SOUTHEAST QUARTER OF SECTION 13e TOWNSHIP 2
NORTH, RANGE 4 EAST, W.M., IN KING COUNTY, WASHINGTON, DESCRIBED AS
�..� FOLLOWS:
CO
BEGINNING AT THE SOUTH QUARTER CORNER OF SAID SECTION 13; THENCE NORTH
00°58'28" EAST ALONG THE NORTH-SOUTH CENTERLINE OF SAID SECTION 13 A
DISTANCE OF 884.84 FEET. TO THE SOUTHEAST CORNER OF TRACT• 26 OF RENTOI
SHORELANDS SECOND SUPPLEMENTAL MAPS, 1958; THENCE SOUTH 72°37'52" WEM
• • ALONG THE SOUTH BOUNDARY OF SAID TRACT 26 A DISTANCE -OF 382.60 FEET;
THENCE NORTH 70°54©02" WEST-ALONG SAID SOUTH BOUNDARY OF TRACT 26 A
DISTANCE OF 73.50 FEET TOi THE EAST LINE .OF THE CHARLES BROWNELL
DONATION LAND CLAIM NO. 41; THENCE NORTH. 01°24'04" EAST ALONG SAID
EAST LINE OF THE CHARLES. BROWNELL DONATION LAND CLAIM NO. 41 A DISTA;
OF 950.58 FEET TO A LINE 35 FEET SOUTHERLY OF AND PARALLEL WITH THE
CENTERLINE OF THE .EXISTING MOST SOUTHERLY TRACK OF THE CHICAGO,
MILWAUKEE, ST. PAUL 6 PACIFIC RAILROAD TRACKS AND THE TRUE POINT OF
BEGINNING' THENCE WESTERLY ALONG SAID PARALLEL LINE ON A CURVE TO THE
LEFT, THE CENTER OF WHICH BEARS SOUTH 15°22'32" EAST HAVING' A RADIUS .
2790.19 FEET, AN ARC DISTANCE OF 789.44 FEET THROUGH A CENTRAL ANGLE Di
16°12'39" TO A POINT OF COMPOUND CURVE^ATHENCE CONTINUING ALONG SAID
•
•
•
•
•
•
•
•
•
ti. .r.t _ . .
_.... , _.xf=�:,iXc n: .• ....• rs .•t.. . ... �t ... 1 .. t:.n.'. .`..R i....1t•:.!'.��a'C,. ;.._c....".:: .ti,_i l i.::•..
It'
�/'L. iw..J • J.
• 2 OF 3
PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS SOUTH
31°35'11" EAST HAVING A RADIUS OF 2580.74 FEET, AN ARC DISTANCE OF
437.40 FEET THROUGH A CENTRAL ANGLE OF 09°42° 39" TO A. POINT OF REVERS
CURVE; THENCE CONTINUING ALONG SAID PARALLEL LINE ON A CURVE TO THE
RIGHT, THE CENTER OF WHICH BEARS NORTH 41°17°50°' WEST HAVING A RADIUS
OF 428.64 FEET, AN ARC DISTANCE OF 73032 FEET THROUGH A CENTRAL ANGLE
OF 09°48'04" TO A POINT OF REVERSE CURVE; THENCE CONTINUING ALONG SAIL
PARALLEL LINE ON A CURVE ,TO THE LEFT, THE CENTER OF WHICH BEARS SOUTH
31°29°46" EAST HAVING A RADIUS OF 676©58 FEET, AM ARC DISTANCE OF 930'
FEET THROUGH A CENTRAL ANGLE OF O7°55'47" TO A . POINT OF TANGENCY;
THENCE CONTINUING ALONG. SAID PARALLEL .LINE SOUTH 50°34°2701 WEST A
DISTANCE OF 248.50 FEET TO A POINT OF CURVE ; THENCE CONTINUING ALONG
SAID PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS .
SOUTH 39°25'33" EAST HAVOC A RADIUS OF 696.89 FEET, AN ARC DISTANCE (
7) . 40.09 FEET THROUGH A CENTRAL ANGLE OF 03°17 °45°f TO THE SOUTH LINE OF
THE BURLINGTON NORTHERN RAILROAD RIGHT-OF-WAY; THENCE NORTH 43°49°09"
O EAST ALONG SAID SOUTH LINE A DISTANCE OF 173.83 FEET TO A POINT OF
CURVE; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE
RIGHT, THE CENTER OF WHICH BEARS SOUTH 46°10' 51" EAST HAVING A RADIUS
O OF 4030.00 FEET, AN ARC DISTANCE OF 197.57 FEET THROUGH A CENTRAL ANGL
ap OF 02°48'32" TO A POINT OF COMPOUND CURVE© THENCE CONTINUING ALONG SA]
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
43°22'19" EAST HAVING A RADIUS OF 1853.00 FEET, AN ARC DISTANCE OF
194.75 FEET THROUGH A CENTRAL ANGLE OF 06°O1° 18" TO A POINT OF COMPOUN
CURVE; THENCE CONTINUING 'ALONG SAID SOUTH LINE ON 'A CURVE TO THE RIGHT
THE CENTER OF WHICH BEARS SOUTH 37°21°0100 EAST HAVING A RADIUS OF
10543.00 FEET. AN ARC DISTANCE OF 186.51 FEET THROUGH A CENTRAL ANGLE'
OF O1°00'49" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAI
SOUTH LINE ON A CURVE TO THE RIGHTS THE CENTER OF WHICH BEARS SOUTH
36°20'12" EAST HAVING A RADIUS OF 1657.00 FEET AN ARC DISTANCE OF
193.93 FEET THROUGH A CENTRAL ANGLE OF• 06°42°20°' TO A POINT OF COMPOUN
CURVE; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE RIGHT
THE CENTER OF WHICH BEARS1SOUTH 29°37°52D° EAST HAVING A RADIUS OF
6738.00 FEET, AN ARC DISTANCE OF 497.76) FEET THROUGH A CENTRAL ANGLE 0
O1°40'54" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
27°56'58" EAST HAVING A RADIUS OF 1768.00 FEET, AN ARC DISTANCE OF
194.45 FEET THROUGH A CENTRAL ANGLE OF 06°18°06" TO A POINT OF COMPOUN
CURVE; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE RIGHT
THE CENTER OF WHICH BEARS .,SOUTH 21°38'52" EAST HAVING A RADIUS OF
8603.00 FEET, AN ARC DISTANCE OF 204.54 FEET THROUGH A CENTRAL ANGLE 01
O1°21°44" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
20°17'08" EAST HAVING A RADIUS OF 1922.10 FEET, AN ARC DISTANCE OF
178.79 FEET THROUGH A CENTRAL ANGLE OF 05°19°4600 TO A POINT OF COMPOUNI
CURVE ON THE EAST LINE OF SAID CHARLES BROWNELL DONATION LAND CLAIM NOf
41; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE RIGHT,
THE CENTER OF WHICH BEARS SOUTH 14°57°2200 EAST HAVING A RADIUS OF
2814.93 FEET, AN ARC DISTANCE OF 659.42 FEET THROUGH A CENTRAL ANGLE OF
13°25'19" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
SOUTH LINE ON A CURVE TO THE RIGHTv THE CENTER OF WHICH BEARS SOUTH
•
•
i
".L .. ' :' 1. •.I�•f..•A11 14..a1.1.1•• ''�:'r._•:��'q .1 •1j'if••. • rr YA•..1.'OJaA:• •J!_A 1..{.• J ..
•
�.- 3 OF 3
O1°32°03" EAST HAVING A RADIUS OF 1165.09 FEET, AN ARC DISTANCE OF
' 1097.05 FEET THROUGH A CENTRAL ANGLE OF 53°57 'OO" - TO A POINT OF
TANGENCY; THENCE CONTINUING ALONG SAID SOUTH LINE SOUTH 37°35°03°f E
A DISTANCE OF 308.70 FEET TO A POINT OF CURVE; THENCE CONTINUING AL
SAID SOUTH LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS
NORTH 52°24°57" EAST HAVING A RADIUS OF 1005.37 FEET, AN ARC DISTAN
OF 45.82 FEET THROUGH A CENTRAL ANGLE OF 02°36°41" TO A LINE 35 FEE'
SOUTHERLY OF AND PARALLEL WITH THE CENTERLINE OF THE EXISTING MOST
SOUTHERLY TRACK OF THE CHICAGO, MILWAUKEE, ST. PAUL Es PACIFIC RAILRI
TRACKS; THENCE WESTERLY ALONG SAID PARALLEL LINE NORTH 40°1'1°44" WE
DISTANCE OF 126.24 FEET TO A POINT OF CURVE ; THENCE CONTINUING ALONE
SAID PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEAR;
SOUTH 49°48°16" WEST HAVING A RADIUS OF 1829.78 FEET© AN ARC DISTAN(
OF 309.67 FEET THROUGH A CENTRAL ANGLE OF o9°41 °48"; THENCE NORTH
• 49°53°32" WEST ALONG SAID PARALLEL LINE A DISTANCE OF 167.07 FEET IC
POINT OF CURVE; THENCE CONTINUING ALONG SAID PARALLEL LINE ON A CURS
TO THE LEFT, THE CENTER OF WHICH BEARS SOUTH 40°06° 28" WEST HAVING G
:s1 RADIUS OF 1102.46 FEET,' AN ARC DISTANCE OF 807.11 FEET THROUGH A
CENTRAL ANGLE OF 41°56°46°' TO A POINT OF COMPOUND CURVE; THENCE
CONTINUING ALONG SAID PARALLEL LINE ON A CURVE TO THE LEFT, THE CENT
OF WHICH BEARS SOUTH O1°5011889 EAST HAVING A RADIUS OF 2790.19 FEET,
ARC DISTANCE OF 659.24 FEET THROUGH A CENTRAL ANGLE OF 13°32° 14" TO
THE TRUE POINT OF BEGINNINGv
•
•
•
•
•
•
•
•
•
•
•
•
•
' I ... ._. ,.,,.g: �'/.-Rp.:. isA.?ah1C•Iw �. P(:1'. aS. l.•J.-...1i' y .. . _. . . . . ..._t._t', - .�. n • •L.M• .4 JO
loft
EXHIBIT 3
TO' AGREEMENT
1 PARCEL "C"
THAT PORTION OF TRACT 25, RENTON SHORELANDS SECOND
j SUPPLEMENTAL; AND
9
THAT PORTION OF THE SOUTHEAST QUARTER OF SECTION 13, AND THE
SOUTHWEST QUARTER OF SECTION 13 IN TOWNSHIP 23 NORTH, RANGE 4 EAST
W.M., AND THE SOUTHWEST QUARTER OF SECTION 18, TOWNSHIP 23 NORTH,
RANGE 5 EAST W.M. IN KING COUNTY, WASHINGTON DESCRIBED AS FOLLOWS:
BEGINNING AT THE SOUTH QUARTER CORNER OF SAID SECTION 13; THENCE
NORTH 00°58'28" EAST ALONG THE NORTH-SOUTH CENTERLINE OF SAID SECTION
13, A DISTANCE OF 884.84 FEET TO THE SOUTHEAST CORNER OF TRACT 26 OF'
RENTON SHORELANDS SECOND SUPPLEMENTAL MAPS, 1958, AND THE TRUE POINT
OF BEGINNING; THENCE SOUTH 72°37'52" WEST ALONG THE SOUTH BOUNDARY OF
SAID TRACT 26, A DISTANCE OF 382.60 FEET; THENCE NORTH 70°54'02" W ES'1'
ALONG THE SOUTH BOUNDARY OF SAID TRACT 26, A DISTANCE OF 73.51 FEET TO
THE EAST LINE OF THE CHARLES BROWNELL DONATION LAND CLAIM NO. 41;
THENCE NORTH 01°24'04" EAST ALONG SAID EAST LINE, A DISTANCE OF 950.58
FEET TO A LINE 35 FEET SOUTHERLY OF AND PARALLEL WITH THE CENTERLINE
OF THE EXISTING MOST SOUTHERLY TRACK OF THE CHICAGO, MILWiAUKEE, ST.
PAUL AND PACIFIC RAILROAD TRACTS; THENCE ALONG SAID LINE 35 FEET
SOUTHERLY OF AND PARALLEL WITH THE CENTERLINE OF THE MOST SOUTHERLY
TRACK, ALONG A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
15°22'32" EAST, HAVING A RADIUS OF 2,790.19 FEET, AN, ARC
•
• l. . r 2 OF 2
•
•
•
•
•
• • •-••• - . ammo••— ••�•rr•• ..•• .---��•• •
•
•
DISTANCE OF 659.24 FEET1THR000H A CENTRAL ANGLE OF 13°32. 14"
TO A POINT. OF COMPOUND CURVE;
THENCE ALONG A CURVE TOiTHE RIGHT• ALONG SAID PARALLEL LINE,
THE CENTER OF WHICH BEARS SOUTH O1°50918" EAST HAVING A
. RADIUS OF 1,102.46 FEET, AN ARC DISTANCE OF 807.11 FEET
•
THROUGH A CENTRAL ANGLE ,OF 41°56°46"; THENCE SOUTH 49°53132"
- c1 . EAST, ALONG SAID PARALLEL LINE, A DISTANCE OF 167.07 FEET;
THENCE ALONG A CURVE TO THE RIGHT, ALONG SAID PARALLEL LINE, •
HAV'ING A RADIUS OF 1,829.78 FEET, AN ARC DISTANCE OF 309.67
p FEET THROUGH A CENTRAL ANGLE OF 09°41•4801 ; THENCE •
o LEAVING SAID PARALLEL LINE, SOUTH 40°11944" EAST, A
DISTANCE OF .126.24 FEET TO A POINT ON THE SOUTH LINE OF THE
' a0 ' BURLINGTON NORTHERN RAILROAD RIGHT-OF-WAY;
THENCE ALONG A CURVE TO THE LEFT, ALONG SAID SOUTH LINEe THE
CENTER OF WHICH BEARS NORTH 49°48'16" EAST HAYING A RADIUS
OF 1,005.37 FEET, AN ARC DISTANCE OF 549.02 FEET THROUGH A
CENTRAL ANGLE OF 31°17919" TO A POINT OF TANGENT ON SAID
SOUTH LINE OF THE BURLINGTON NORTHERN RAILROAD RIGHT-OF-WAY; .
THENCE CONTINUING ALONG SAID SOUTH LINE, SOUTH 71°29°03" •
EAST ALONG A LINE 50 FEET SOUTH OF AND PARALLEL WITH THE
EXISTING SOUTHBOUND TRACK,-A DISTANCE OF 826.56 FEET- TO THE
WEST LINE OF SAID SECTION 183 THENCE CONTINUING ALONG • SAID
. SOUTH LINE SOUTH 71°29.03'° EAST, A DISTANCE .OF 85.52 FEET TO THE
NORTH LINE OF THE SOUTH 650 FEET OF THE SOUTHWEST QUARTER OF
THE SOUTHWEST QUARTER OF SAID SECTION 18; THENCE NORTH
89°1O'25" WESY-'ALONG THE NORTH LINE OF SAID SOUTHWEST QUARTER
• OF THE SOUTHWEST QUARTER �OF SECTION 18, A DISTANCE OF 81.57
FEET TO THE EAST LINE OF .THE SOUTHEAST QUARTER OF SAID SECTION _
13; THENCE NORTH 88°15 •00Q1 WEST ALONG THE NORTH LINE OF THE NORTH 650 FEET OF THE SOUTHEAST QUARTER OF SAID SECTION 13, _
A DISTANCE OF 2,261041 FEET TO AN ANGLE POINT ON THE SOUTH
BOUNDARY OF TRACT 25 ;OF RENTON SHORE LANDS, 1958; THENCE
NORTH 33°07°25" WEST ALONG SAID SOUTH BOUNDARY, A DISTANCE
' OF 154.51 FEET TO AN ANGLE POINT; THENCE NORTH 27°21°32"
EAST ALONG SAID SOUTH BOUNDARY, A DISTANCE OF 387.32 FEET
TO AN ANGLE POINT; THENCE ; NORTH 83°17 .25°' WEST ALONG SAID SOUTH
BOUNDARY, A DISTANCE OF-171.17 FEET•;-•-THENCE •SOUTH• 46°22'22L 1- • - -
WEST ALONG SAID SOUTH BOUNDARY, A DISTANCE OF 324.66 FEET;
THENCE SOUTH 72°37°52" WEST ALONG SAID SOUTH BOUNDARY, A
DISTANCE OF 76.33 FEET TOiTHE TRUE POINT OF BEGINNING°
•
•
• •
•
•
1
•
4• ' -- +i,:-:' • 'g; :0 i•r .1•1:1%'i.••S.t-• 44-4:;44 «i�ir$P:m..7.4 •ljv,,�,� l°! ‘,1 V4.et:F *X": �� ::�` ;""''1 S ‘o.1,1
L. BIT ..A..
LEGAL DESCRIPTION
ALTERRA REZONE, File R-129-80 1 OF 2
•
ORDINANCE No.
PAGE. 1 o 7
PARCEL A:
•
THAT PORTION OF THE SOUTHWEST QUARTER OF .SECTION_I3,. TOWNSHIP 23
. NORTH, RANGE 4 EAST• W.Hos IN ,KING COUNTY, WASHINGTON; AND ,
THAT
PORTION OF 'JUNCTION ADDITION TO CITY OF SEATTLE, ACCORDING TO THE
PLAT RECORDED IN VOLUME 12 OF PLATS, PAGE 75, IN KING COUNTY0
WASHINGTON, TOGETHER WITH VACATED STREETS ADJOINING WHICH WOULD ATTACH'
TO SAID PREMISES BY OPERATION 'OF LAW, AND OF C. E© BROWNELL'S DONATION
CLAIH NO. 41' AND OF THAT PORTION OF TRACT 26, RENTON SHORE LANDS 2ND
SUPPLEMENTAL, DESCRIBED AS FOLLOWS: •
•
BEGINNING AT THE SOUTH QUARTER CORNER OF SAID SECTION 13; THENCE NORTH
00058'28" EAST ALONG THE NORTH-SOUTH CENTERLINE OF SAID SECTION 13 A
DISTANCE OF 884.84 FEET TO THE SOUTHEAST CORNER OF TRACT 26 OF RENTON
SHORELANDS SECOND SUPPLEMENTAL HAPS.'s, 1958; THENCE SOUTH 72°37°52" WEST .
ALONG THE SOUTH BOUNDARY OF SAID TRACT 26 A DISTANCE OF 382.60 FEET;
THENCE NORTH 70°54'02" WEST ALONG SAID SOUTH . BOUNDARY OF TRACT 26 A
DISTANCE, OF• 73.50 FEET TO THE EAST LINE OF THE CHARLES BROkNELL
DONATION LAND CLAIM NO. 41 AND THE TRUE POINT OF BEGINNING; THENCE
CONTINUING NORTH 70°54°O2" WEST ALONG SAID SOUTH BOUNDARY OF TRACT 26
DISTANCE OF 281.02 FEET; THENCE SOUTH 73°56°01" HEST ALONG SAID SOUTH
BOUNDARY OF TRACT 26 A DISTANCE OF 130.08 FEET; THENCE SOUTH 41°16'07"
WEST ALONG SAID SOUTH BOUNDARY OF TRACT 26 A DISTANCE OF 316.18 FEET IC
THE NORTH BOUNDARY OF A TRACT OF LAND DEEDED TO KING COUNTY AND
DESCRIBED UNDER KING COUNTY AUDITOR'S FILE NO. 6607786; THENCE
WESTERLY ALONG SAID NORTH BOUNDARY ON A CURVE TO THE LEFT, THE CENTER
OF WHICH BEARS SOUTH 39°41'39" WEST HAVING A RADIUS OF 627.46 FEET AN
ARC DISTANCE OF 434.70 FEET THROUGH A CENTRAL ANGLE OF 39°41'39";
THENCE NORTH A DISTANCE OF 25.00 FEET ALONG SAID NORTH BOUNDARY;
THENCE WEST A DISTANCE OF 280.69 FEET ALONG SAID NORTH BOUNDARY;
THENCE SOUTH 59°53'47" WEST ALONG SAID NORTH BOUNDARY A DISTANCE OF
377.52 FEET;• THENCE SOUTH..740.13°19!'.WEST . ALONG.,SAID NORTH BOUNDARY A
DISTANCE OF 443.31 FEET TO THE; NORTHERLY MARGIN OF THE CHARLES MONSTER
COUNTY ROAD; THENCE NORTH 34°18'31" HEST ALONG SAID NORTHERLY MARGIN A
DISTANCE OF 43.46 FEET TO THE SOUTH LINE OF THE BURLINGTON NORTHERN
RAILROAD RIGHT—OF—NAY; THENCE ALONG A CURVE TO THE LEFT, ALONG SAID
SOUTH LINE, THE CENTER OF WHICH BEARS NORTH 06°34'41" WEST HAVING A
RADIUS OF 696.00 FEET, AN ARC DISTANCE OF 45.43 FEET THROUGH A CENTRAL
ANGLE OF 03°44'25" TO A POINT OF COMPOUND CURVE; THENCE ALONG A CURVE
TO THE LEFT, ALONG SAID SOUTH LINES THE CENTER OF WHICH BEARS NORTH
10°19'06" WEST HAVING A RADIUS OF 1 .055.00 FEET," AN ARC DISTANCE OF
209.95 FEET THROUGH A CENTRAL ANGLE OF 11°24'OB" TO A POINT OF COMPOUND
CURVED THENCE ALONG A CURVE TO ITHE LEFT, ALONG SAID SOUTH LINE, THE
CENTER OF WHICH BEARS NORTH 21°43°1'1" WEST HAVING A RADIUS OF 727.00
FEET, AN ARC DISTANCE OF 214.77 FEET THROUGH. A CENTRAL ANGLE OF
16°55'35" TO A POINT OF COMPOUND CURVE; THENCE ALONG A CURVE TO THE
LEFT, ALONG SAID SOUTH LINE, THE CENTER OF WHICH BEARS NORTH 38°38'49"
c yr
1
WEST .HAVING A RADIUS a.- 19571.00 FEET, AN ARC DISTANCE OF 206.57 FEET
THROUGH A CENTRAL ANGLE OF 07°32°02" TO A POINT OF TANGENCY; THENCE
NORTH 43°49°09" EAST ALONG SAID SOUTH LINE A DISTANCE OF 97.17 FEET TO
' A LINE 35 FEET SOUTHERLY OF AND PARALLEL WITH THE CENTERLINE OF THE
EXISTING MOST SOUTHERLY TRACK1OF THE CHICAGO, MILWAUKEE, ST. PAUL A%3
PACIFIC RAILROAD TRACKS; THENCE ALONG SAID PARALLEL LINE ON A CURVE TO
THE RIGHT, THE CENTER OF WHICH BEARS SOUTH 42°43° 1809 EAST HAVING A
RADIUS OF 696.89 FEET, AN ARC DISTANCE OF 40.09 FEET THROUGH A CENTRAL
ANGLE OF 03°17°45"; THENCE NORTH 50°34°27°4 EAST ALONG SAID PARALLEL
LINE A DISTANCE .OF 248.50 FEET; THENCE ALONG SAID PARALLEL LINE ON A
CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH 39°25°33" EAST
HAVING A RADIUS OF 676.58 FEET, AN ARC DISTANCE OF 93.64 FEET THROWN A
CENTAL ANGLE' OF 07°55°407n TO A POINT OF REVERSE CURVE; THENCE ALONG
SAID PARALLEL LINE ON A CURVE ,TO THE LEFT, THE CENTER OF WHICH BEARS
NORTH 31°29°46" WEST HAVING A RADIUS OF 428.64 FEET, AN ARC. DISTANCE 3F
73.32 FEET THROUGH. A CENTRAL ANGLE OF. 09°48°04" TO A POINT OF REVERSE k
CURVE; THENCE ALONG SAID PARALLEL LINE ON A CURVE TO THE RIGHT, THE
CENTER OF WHICH. BEARS SOUTH 41°17°50" EAST HAVING A RADIUS OF 29580.74
FEET, AN ARC DISTANCE OF 437.4® FEET THROUGH A CENTRAL ANGLE OF
09°42°39" TO A POINT OF COMPOUND CURVE; THENCE ALONG SAID PARALLEL LINE
ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH 31°35°11"
EAST HAVING A RADIUS OF 2,790.19 FEET, AN ARC DISTANCE OF 789.44 FEET
THROUGH A CENTRAL ANGLE OF 16°12°39" TO THE EAST LINE OF THE CHARLES
BROWNELL DONATION LAND. CLAIM NO. 41; THENCE SOUTH 01°24°04" WEST ALMG
• SAID EAST LINE A DISTANCE OF 950.58 FEET TO THE TRUE POINT OF
BEGINNING.
•
•
•
•
.. ••• •
•
•
• OD • . ••\ • , • •� • .•. •• ., w _••N —� N I�� • f\ _w se In •ea
•
•
• •
•
•
•
•
•
•
•
•
•
•
•
• •
EXHIBIT "A" .
LEGAL DESCRIPTION
ALTERRA REZONE, File R-129-80
ORDINANCE4Io.
•
PAGE 2 p 7
•
•
•
•
. .
EXHI "A"
LEGAL DEL..,IPTION
ALTERRA REZONE, File R-129-80
• ' • ORDINANCE NO.
PAGE .3 o r� 1 OF 3
•
•
•
. I
•
. `
PARCE• 8s
THAT PORTION OF Co E. BROWNELLaS DONATION CLAIM NO. 41, AND OF THE
SOUTHWEST QUARTER AND THE SOUTHEAST QUARTER OF SECTION 13, TOWNSHIP 23
NORTH, RANGE 4 EAST, H.Mo• IN KING COUNTY, WASHINGTONv DESCRIBED AS
FOLLOWS:
BEGINNING AT THE SOUTH QUARTER CORNER OF SAID SECTION 13; THENCE NORM
00°5802811 EAST. ALONG THE NORTH—SOUTH CENTERLINE OF SAID SECTION 13 A
DISTANCE OF 884.54• FEET• TO THE SOUTHEAST CORNER OF TRACT 26 OF RENTc
SHORELANDS SECOND SUPPLEMENTAL MAPS, 1958; THENCE SOUTH 72°371524 WEST
ALONG THE SOUTH BOUNDARY OF SAID TRACT 26 A DISTANCE OF 382.60FEET; •
THENCE NORTH10054'02" WEST• ALONG •SAID SOUTH BOUNDARY OF TRACT 26 A
DISTANCE OF 73.50 FEET TO THE EAST LINE'®F THE CHARLES BROWNELL
DONATION LAND CLAIM N0. 41; THENCE NORTH. 01024m040+ EAST ALONG SAID EAST LINE OF THE CHARLES BROWNELL DONATION LAND CLAIM NO. 41 A DISTAI4E
OF 950.58 FEET TO A LINE 35 FEET SOUTHERLY OF AND PARALLEL WITH THE
CENTERLINE OF THE.EXISTING HOST SOUTHERLY TRACK OF THE CHICAGO,
MILWAUKEE, ST. PAUL C PACIFIC RAILROAD TRACKS AND THE TRUE POINT OF
BEGINNING; THENCE WESTERLY ALONG SAID PARALLEL LINE ON A CURVE TO THE
LEFT, THE CENTER OF WHICH BEARS SOUTH 15°22232m EAST HAVING. A RADIUS 9F
2790.19 FEET, AN ARC DISTANCE OF 789.44 FEET. THROUGH A CENTRAL ANGLE 8F
16°12°390° TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
i •.
•
•
•
•
•
•
ik
•
4
•
• 2 OF 3
PARALLEL LINE ON A CURVE' TO THE LEFT, THE CENTER OF WHICH BEARS SOUTH
31°35°11• EAST HAVING A RADIUS' OF 2580.74 FEET, AN ARC DISTANCE OF
437.40 FEET THROUGH A CENTRAL ANGLE OF 09°42°39" TO A POINT OF REVERSE
CURVE; THENCE CONTINUING ALONGIAID PARALLEL LINE ON A CURVE TO THE
RIGHT, THE CENTER OF WHICH BEARS NORTH 41°17'50" WEST HAVING A RADIUS
OF 428.64 FEET, AN ARC DISTANCE OF 73.32 FEET THROUGH A CENTRAL ANGLE
OF 09°48'04"• TO A, POINT OF REVERSE CURVE; THENCE CONTINUING ALONG SAID
PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH, BEARS SOUTH
31°29'46" EAST HAVING A RADIUS! OF 676058 FEET, AN ARC DISTANCE OF 93.64
FEET THROUGH A CENTRAL ANGLE OF 07°55'47" TO A . POINT OF TANGENCY;
THENCE CONTINUING ALON, SAID PARALLEL .LINE SOUTH 50°34°27Q9 WEST A
DISTANCE OF 248.50 FEET TO A POINT OF CURVE; THENCE CONTINUING ALONG
SAID PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS .
SOUTH 39°25'33" EAST HAVING A RADIUS OF 696.89 FEET AN ARC DISTANCE OF
40.09 FEET THROUGH A CENTRAL ANGLE OF 03°17°45i° TO THE SOUTH LINE OF
THE BURLINGTON NORTHERN RAILROAD RIGHT-OF-WAY; THENCE NORTH 43°49°09"
EAST ALONG SAID SOUTH LINE A DISTANCE OF 173.83 FEET TO A POINT OF
CURVE; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE
RIGHT, THE CENTER OF WHICH BEARS SOUTH 46°10°51" EAST HAVING A RADIUS
OF 4030.00 FEET, AN ARC DISTANCE OF 197.57 FEET THROUGH A CENTRAL ANGLE
OF 02°48'32i0 TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID,
SOUTH LINE ON A CURVE TO THE RiGHTv THE CENTER OF WHICH BEARS SOUTH
43°22'19" EAST HAVING A RADIUS OF 1853.00 FEET, AN ARC DISTANCE OF
194.75 FEET THROUGH A CENTRAL ANGLE OF 06°01° 18" TO A POINT OF COMPOUND
CURVE; THENCE CONTINUING ALONG1SAID `SOUTH LINE ON A CURVE TO THE RIGHT©
THE CENTER OF WHICH BEARS • SOUTH 37°21'011° EAST HAVING A RADIUS OF
10543.00 FEET, AN ARC DISTANCE 'OF 186051 FEET THROUGH A CENTRAL ANGLE
OF O1°00'49" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
36°20'12" EAST HAVING A RADIUS OF 1657000 FEET AN ARC DISTANCE OF
193.93 FEET THROUGH A CENTRAL ANGLE OF. 06°42°20" TO A POINT OF COMPOUND
CURVE; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE RIGHT,
THE CENTER OF WHICH BEARS SOUTH 29°37°52" EAST HAVING A RADIUS OF
6738.00 FEET, AN ARC DISTANCE OF 197.76 FEET THROUGH A CENTRAL ANGLE OF
O1°40'54" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
27°56'58" EAST HAVING A RADIUS1OF 1768.00 FEET, AN ARC DISTANCE OF
194.45 FEET THROUGH A CENTRAL ANGLE' OF 06°18°06" TO A POINT OF• COMPOUND
CURVE; THENCE CONTINUING ALONG "'SAID SOUTH LINE ON A CURVE TO THE RIGHT, '
THE CENTER OF WHICH BEARS SOUTH 21°38°52" EAST HAVING A RADIUS OF
8603.00 FEET, AN ARC DISTANCE OF 204.54 FEET THROUGH A CENTRAL ANGLE OF
01°21'44" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
20°17'08" EAST HAVING A RADIUS OF 1922.10 FEET, AN ARC DISTANCE OF
178.79 FEET THROUGH A CENTRAL ANGLE OF 05°19'46" TO A POINT OF COMPOUND
CURVE ON THE EAST LINE OF SAID CHARLES BROWNELL DONATION LAND CLAIM NO.
41; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE RIGHT,
THE CENTER OF WHICH BEARS SOUTH114°57'22" EAST HAVING A RADIUS OF
2814.93 FEET, AN ARC DISTANCE OF 659.42 FEET THROUGH A CENTRAL ANGLE OF
13°25'19" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
EXHIBIT "A"
LEGAL DESCRIPTION
ALTERRA REZONE, File R-129-80
ORDINANCE No.
PAGE 4 O 7
• • ./ V6 J
A g'
O1°32'03" EAST HAVING A RADIUS' OF 1165.09 FEETe AN ARC DISTANCE OF
1097*05 FEET THROUGH A CENTRAL ANGLE OF 53°57°00" TO A POINT OF
TANGENCY; THENCE CONTINUING ALONG SAID SOUTH LINE SOUTH 37°35°03" EAS
A DISTANCE OF 306.70 FEET TO A POINT. OF CURVE; THENCE .CONTINUING ALON
SAID SOUTH LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS
NORTH 52°24°57" EAST HAVING A RADIUS OF 1005.37 FEET, AN ARC DISTANCE
OF 45.82 FEET THROUGH A CENTRAL ANGLE OF 02°36°41" TO A LINE 35 FEET
SOUTHERLY OF AND PARALLEL WITH THE CENTERLINE OF THE EXISTING MOST
SOUTHERLY TRACK OF THE CHICAGOe MILWAUKEE, STo PAUL E PACIFIC RAILROAI
TRACKS; THENCE WESTERLY ALONG SAID PARALLEL LINE NORTH 40°11°44" WEST
DISTANCE OF 126.24 FEET TO A POINT OF CURVE; THENCE CONTINUING ALONG
SAID PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS
, SOUTH 49°43916" WEST HAVING A RADIUS OF 1829.78 FEET AN ARC DISTANCE
OF 309.67 FEET THROUGH A CENTRAL ANGLE OF 09°41'48"; THENCE NORTH
49°53°32" WEST ALONG SAID PARALLEL LINE A DISTANCE OF 167.07 FEET 70 I
POINT OF CURVE; THENCE CONTINUING ALONG SAID PARALLEL LINE ON A CURV;
TO THE LEFT, THE CENTER OF WHICH BEARS SOUTH 40°06°28" WEST HAVING A
RADIUS OF 1102.46 FEET, AN ARC DISTANCE OF 807.11 FEET THROUGH A
CENTRAL ANGLE OF 41°56°46" TO A POINT OF COMPOUND CURVE; THENCE
CONTINUING ALONG SA10 PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTS®
• OF WHICH BEARS SOUTH 01°50°18Q0 EAST HAVING A RADIUS OF 2790.19 FEET, A
ARC DISTANCE OF 659.24 FEET THROUGH A CENTRAL ANGLE OF 13°32° 14" TO
THE TRUE POINT OF BEGINNING.
•
-
•
•
•
•
•
EXHIBIT "A"
LEGAL DESCRIPTION
ALTERRA REZONE, File R-129-80
ORDINANCE No.
PAGE 5...�
1 1 UI•- ..
EXHIBIT "A"
LEGAL DESCRIPTION
ALTERRA REZONE, File R-129-80
ORDINANCE No.
' PAGE I 6 0 7
•
•
PARCEL "C"
THAT PORTION OF TRACT 25, RENTON SHORELANDS SECOND
• SUPPLEMENTAL: AND
THAT PORTION OF THE SOUTHEAST QUARTER OF SECTION 13, AND THE
SOUTHWEST QUARTER OF SECTION 13 IN TOWNSHIP 23 NORTH, RANGE 4 EAST
W.M., AND THE SOUTHWEST QUARTER OF SECTION 18, TOWNSHIP 23 NORTH,
RANGE 5 EAST W.M. IN KING COUNTY, WASHINGTON DESCRIBED AS FOLLOWS:
BEGINNING AT THE SOUTH QUARTER CORNER OF SAID SECTION 13; THENCE
NORTH 00°58'28" EAST ALONG THE NORTH-SOUTH CENTERLINE OF SAID SECTION
13, A DISTANCE OF 884.84 FEET TO THE SOUTHEAST CORNER OF TRACT 26 OF
RENTON SHORELANDS SECOND SUPPLEMENTAL MAPS, 1958, AND THE TRUE POINT
OF BEGINNING; THENCE SOUTH 72°37'52" WEST ALONG THE SOUTH BOUNDARY OF
SAID TRACT 26, A DISTANCE OF 382.60 FEET; THENCE NORTH 70°54'02" WEST
ALONG THE SOUTH BOUNDARY OF SAID TRACT 26, A DISTANCE OF 73.51 FEET TO
THE EAST LINE OF THE CHARLES BROWNELL DONATION LAND CLAIM NO. 41;
THENCE NORTH 01°24'04" EAST ALONG SAID EAST LINE, A DISTANCE OF 950.58
FEET TO A LINE 35 FEET SOUTHERLY OF AND PARALLEL WITH THE CENTERLINE
OF THE EXISTING MOST SOUTHERLY TRACK OF THE CHICAGO, MILWAUKEE, ST.
PAUL AND PACIFIC RAILROAD TRACTS; THENCE ALONG SAID LINE 35 FEET
SOUTHERLY OF AND PARALLEL WITH THE CENTERLINE OF THE MOST SOUTHERLY
TRACK, ALONG A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
15°22'32" EAST, HAVING A RADIUS OF 2,790.19 FEET, AN ARC
•
•
•
•
•
•
'I .
, 2 OF 2
.___. _.._.- . -- _•. ..-_ •
DISTANCE OF 659.24 FEET THROUGH A CENTRAL ANGLE OF 13°32° 1401
TO A POINT OF COMPOUND CURVE; -
THENCE ALONG A CURVE TO THE RIGHT, ALONG SAID PARALLEL LINE,
THE CENTER OF •WHICH BEARS SOUTH 01°50°18" EAST HAVING A
RADIUS OF 1,102.46 FEET, AN ARC DISTANCE OF 807011 FEET
THROUGH A CENTRAL ANGLE OF '41°56146"; THENCE SOUTH 49°53°32"
. EAST, ALONG SAID PARALLEL: LINE, A DISTANCE OF 167.07 FEET;
• THENCE ALONG A CURVE TO THE RIGHT, ALONG SAID PARALLEL LINE, .
HAVING A RADIUS OF 1,829.78; FEET, AN ARC DISTANCE OF 309.67
FEET THROUGH A CENTRAL ANGLE OF 09°41 '4 8"; THENCE
LEAVING SAID PARALLEL LINE,I SOUTH 40°11'44" EAST, A '
DISTANCE OF .126.24 FEET TO A POINT ON THE SOUTH LINE OF THE
BURLINGTON NORTHERN RAILROAD RIGHT-OF-WAY;
THENCE ALONG A CURVE TO THE LEFT, ALONG SAID SOUTH LINE, THE
CENTER OF WHICH BEARS NORTH 49°48°16" EAST HAVING A RADIUS
OF 1,005.37 FEET, AN ARC DISTANCE OF 549.02 FEET THROUGH A
CENTRAL ANGLE OF 31°17°19" TO A POINT OF TANGENT ON SAID
SOUTH LINE OF THE BURLINGTON NORTHERN RAILROAD RIGHT-OF-WAY,
THENCE CONTINUING ALONG SAID SOUTH LINE, SOUTH 71°29°03" ' •
EAST ALONG A LINE 50 FEET SOUTH OF AND PARALLEL WITH THE
EXISTING SOUTHBOUND TRACK,-A DISTANCE OF 826.56 FEET- TO THE " - '
WEST LINE OF SAID SECTION 18; THENCE CONTINUING ALONG' SAID
SOUTH LINE SOUTH 71°29°03" EAST, A DISTANCE 'OF .85.52 FEET TO THE
NORTH LINE OF THE SOUTH 650 FEET OF THE SOUTHWEST QUARTER OF
THE SOUTHWEST QUARTER OF SAID SECTION 18; THENCE NORTH
89°10'25" WEST ALONG THE NORTH LINE OF SAID SOUTHWEST QUARTER
OF THE SOUTHWEST QUARTER OF iSECTION 18, A DISTANCE OF G1057
FEET TO THE EAST LINE OF .THE', SOUTHEAST QUARTER OF SAID SECTION
13; THENCE NORTH 88°15'00" WEST ALONG THE NORTH LINE OF THE
NORTH 650 FEET OF THE SOUTHEAST QUARTER OF SAID SECTION 13,
A DISTANCE OF 2,261.41 FEET TO AN ANGLE POINT ON THE SOUTH
BOUNDARY OF TRACT 25 .0F RENTON SHORE LANDS, 1958; THENCE
NORTH 33°07'Z5" WEST ALONG SAID SOUTH BOUNDARY, A DISTANCE
OF 154.51 FEET TO AN ANGLE POINT; THENCE NORTH 27°21'32°
EAST ALONG SAID SOUTH BOUNDARY, A DISTANCE OF 387.32 FEET
TO AN ANGLE POINT; THENCE NORTH 83°17°25" WEST ALONG SAID SOUTH •
. 80UNDARY, • A DISTANCE OF- 171.17 FEET;-THENCE -SOUTH•-46°22'22°--- -•
WEST ALONG SAID SOUTH BOUNDARY, A DISTANCE OF 324.66 FEET; -
THENCE SOUTH 72°37°52" WEST ALONG SAID SOUTH BOUNDARY, A
DISTANCE OF 76.33 FEET TO THE TRUE POINT OF BEGINNING.
•
EXHIBIT "A"
LEGAL DESCRIPTION
ALTERRA REZONE, File R-129-80
ORDINANCE No.
PAGE __,7 p 7 `
v
•
• ,
•
EXHIBIT 4 TO
AGREEMENT
• .
The Company has not surveyed the premises described in �Zl 7:1.:7.._3
The sketch below is furnished without charge solely for the purpose of assisting
in locating said premises and the Company assumes no liability for inaccuracies
therein. It does.not purport to show all highways() roads and easements adjoining
2 or affecting said premises.
i® I � '®
6 I . 1 .. : • v .. , -. .
• I . 04 I, 1/ ‘ f \ . . 4
•
a •
o
a
10 -7• �+
•
1 • • �� �N
I % 1 - •
I / i • •• •
.
• i / . / '
6 ,
P ! , • i I ,
•
i . l •% 0i
r' Ce .
I , '
•' . \ •
• •
� l _ rr ..t
/_, w•. a _._...,a,...._._a,•,r ea.w f.. nr.•.,->-.,,,..•t.._. .:re•_• -__ ,... ►.•r•.•••••'-� _ I i• -•_ ya.M.WL_.• _, -V4..j. AO-•. Le
I f
:
•
•
„• -
1 The Company has not surveyed the premises described in QZa.)3Ls7::
1 The sketch below is furnished without charge solely for the purpose of assisting
I In locating said premises and the Company assumes no liability for inaccuracies
therein. It does not purport to show all highways° roads and easements adjoining
or affecting said premises. 1 \ o
N 1 t aTC.N LIME_ — — . — — .
o •- \—�- . .
V' i . °° %l • •
• ---- °
d
1 1. 1 i r • R•
1 • /'
v p •
��ams rate J
r- r --_ ! 4• • .
•_— /' , 1 •
I
- -1 — - Ut
. f
I . •
I •
. c .•I :
. • .•
r .
I • .
I •- . _
I •
•
• .
•
-. ,. .....• cow... .I.— ...a. mom.
amps. wows.. ...WO-�. '-:4:0S>;t%41 Z. •. �. .I..r W��..al l.:ww•w....wr.o.....,..MA4sM.M. - --- •• • -_.._Ito..
0 6. , .., .
1
.
a 4.
EXHIBIT 5 TO.
AGREEMENT '
•
r That portion o f
, the_south__half_of ' Sect ion 13, Township 23 North. Range 4 East, W.M.
_
' in King County; Washington and of !Junction Addition
todt the
efCity
ofKingSeattle,
according
to plat recorded in Volume 12 of Plats. page 75, rec
of
C.E. Brownell's Donation Claim No; 41 described as follows:
Beginning at the south quarter corner of said Section 13; thence NOO°58'28"E along
the north-south centerline thereof 1092.82 feet; thence N68 03 54 E 224.45 feet to
the TRUE POINT OF BEGINNING; thence S68°03'54"W 575.56 feet; thence N72°04'34"W
389.92 feet; thence S68°06°46"0 429.32 feet; thence south 85.47 feet to a point of
curve; thence on a curve to the left. having a radius of 60.00.feet, thru a central
' angle of 126°52'10", an arc distance of 132.86 feet; thence N53°07'50"E 199.18 feet
to a point of curve; thence on acurve to the right. having a radius of 200.00 feet
thru a central angle of 53 59 30", an arc distance of 188.47 feet; thence S72°52'4001E
• 290.00 feet to a point of curve; thence on a curve to the left, having a radius of
197.00 feet. thru a central angle ;of 39°o8'51", an arc distance of 134:60 feet; thence
N67°58'29"E 380.92 feet; thence N31°27'12"E 204.86 feet to the TRUE POINT OF BEGINNING
Containing 165,263 square feet or 3.794 acres more or less.
•
l •
l •
. •
.
d
1
• EXHIBIT 6 TO r
AGREEMENT
That portion of the south half of Section 13, Township 23 North, Range 4 East, W.M.
in King County, Washington, of Junction Addition to the City of Seattle, according
to the plat recorded in Volume 121of Plats, page 75, records of said King County,
and of C.E. Brownell 's Donation Claim No. 41 , described as follows:
Beginning at the south quarter corner of said Section 13; thence NOO°58'28"E along
the north-south centerline thereof 1092.82 feet; thence 568°03'54"W 351.11 feet to
the TRUE POINT OF BEGINNING; thence N68°03'54"E 575.56 feet; thence N12°01 '00"W
40.75 feet; thence S77°59'00"W 133.01 feet to a point of curve; thence along a
curve to the right having a radius of 230.00 feet, through a central angle of
27°47'31" an arc distance of 111.56 feet to a point of compound curvature; the
center of said curve bears N15°46'31"E 160.00 feet; thence along said curve to the
m right, through a central angle of; 70°48' 19" an arc distance of 197.73 feet; thence
S82°15'00"W 67.68 feet; thence 531°32'22"W 71 .06 feet; thence N81°ll '35"W 193.00
4 feet; thence 582°15'00"W 92.99 feet; thence S35°29'30"W 143. 18 feet; thence
O•n N74°44'00"W 84.85 feet; thence 560°16'00"W 67.00 feet; thence S12°16'00"E 97.35
feet; thence N68°06'46"E 53.79 feet to a point which bears N72°04'34"W from the
c)O TRUE POINT OF BEGINNING; thence S72°04'34"E 389.92 feet to the TRUE POINT OF
0 BEGINNING. .
Containing 182,206 square feet or 4. 1829 acres more or less.
. o
.
•
TRIAD ASSOCIATES
11415 N.E. 128TH STREET WRITTEN BY JAM
KIRKLAND, WA 85433
CHECKED BY.G�C-i
COMPARED (--\v\\ \
•
•
•
•
• EXHIBIT 7 TO. .
• AGREEMENT
•
.
That portion of t ito City he southwest quarter of Section 13, Township 23 Noi-th, Range 4 East,
W.M. in King County, Washington and that
Volumeila ®o P1ats,Junction
paged75.orecords of said
Seattle. according to plat recore i
King County, together with vacated streets adjoining
whichlwouldaittaClmch to,saidcribed
premises by operation og�law,_and of C.E. Broes
wnell's
as follows:•
Beginning at the south quarter corner of .said Section 13; thence N00°58'28"E along
• f Tract
.-1 the north-south centerline thereof 884.84 f eettothesoutheast 5corner
60 feet to,
® Renton Shorelands Second Supplemental Maps 1958; thence
00 an angle point in the south line of said Tract 26; thence N70°54'02'°W 354.53 feet to
• an angle point in the south line of said Tractat ; $hence S41°16'07"W along8theesouth
t to
an angle point in the south line of said Tr 26;
line of said Tract 26 a distanceof 316.18 feet to the
north
Recordingboundary
Numbert6607786;
ract of
land deeded to King County and described under King County
thence westerly along said north boundary onaacurve otof 3the1'left,
theacecent
rt which
of
bears S39°41 '39"W 627.46 feet. thru a central g thence west
434.70 feet; thence north along said north boundary
thence northal56913
said north boundary 245.69 feet to the TRUE47 feet to the southerly
°00' 4"W 109. point on
feet; thence N50°39'19"E 330-21 feet; thence N33 5
margin of the Burlington Northerr�SRao�road0��Ei 1h53®®o Jfeet;said
the cepoint
westerlyaalong said
a verve, the center which bears. 39 3
southerly margin and curve to the lef��th ndaeurve,al theneenter ofgle of 5said11curve arc
bears
• distance of 129.00 feet to a pointof po
S43°22' 19"E 4030.00 feet; .thence westerly along saidsoutherly margin and curve to
the left, thru a central angle of 2°48°32'0a
an arc distance of 197.57 feet to a point
of tangency; thence S43°49'09"W along said an arc distance of 206.a 57 feet to south southerlyh margin
271.00 feet
hto agpoint
of
curve; thence on a curve to the right along
ius
of 1571 .00 feet, thru a central angle of 7 32'02��
. a point of compound curved the center which
$��°�89�� thence of
westerly along said southerly margin and
16°55'35", an arc distance of 214.77 feet to a point of compound curve, the center
which bears N21°43°14"W 1055.00 feet; t''nn;e we®f , an arcterly outherly ofrgin
209.95
and curve to the right, thru a central angle
feet to a point-of compound curve; thmacenter
and cuve to the right
which
bears
o6 hru9a•central feet;
of _
thence westerly along said southerly r9
3°44'25", an arc distance of 45.43 feet to the easterly margin of the Charles Monster
County Road; thence S34°18'31"E along said easterly margin 43.46 feet to' the north
boundary of said tract deeded !to King County anddnorthbed under boundary 443�31ofeet;unty Rthenecord-
ce
in Number 6607786; thence N74 13 19 E along said
N59°53'47"E along said north boundary 377B5G1fe1t; thence east along said north
boundary 35.00 feet to the TRUE POINT OF
Containing' 114,401 square feet or 2.626 acres more or less.
•
•
•
•
•: : �' • :'F • ,t:�^11.' , t''!�'Ili :� 611•;OSOM %w ''�'1''!'.1L':Y'+�.T. t-:Is t:rS1 ' �1.111 :',';ti.i .
• i
f ` L
EXHIBIT 8 TO
• AGREEMENT, •
That portion of the south half of Section 13, Township 23 North. Range 4 East, W.H.
in King County, Washington; and o Junction Addition to the City of Seattle.
according
to the plat recorded in Volume 12 of Plats, page 75. records of said. King .e y,
together with vacated streets adjoining which would attach to said premises by opera-
07 tion of Law; and of C.E: BrowneTs Donation Claim No. 41 , and of Tracts 25 and 26,
c/ Renton Shore. Lands 2nd Supplemental Maps 1958, described as follows:
In
1/7 Beginning at the south quarter, co ner of said Section 13; thence N00058128"E along the
O north-south centerline thereof 1092.82 feet; thence N68°03'54"E 224.45 feet to a point
o hereinafter called "Point A"; 568°03'54"�l 575.56 feet; thence N72°04'34"�
CI389.92 feet; thence S68 06 460e W 429.32 feet. to the TRUE POINT OF BEGINNING; thence
ap south 8$.47 feet to a point ofieurve; thence on a curve to the left, having a radius
of 60.00 feet, thru a central angle of 126°52' 10", an arc distance of 132.86 feet;
thence N53°07'SO"E 199.18 feet to' a point of curve; thence on a curve to
thdietane ght,
having a radius of 200.00 feet•thru a central angle of 53°59°30", an atc
188.47 feet; thence 572°52'40"E 290.00 feet to a point of curve; thence on a curve to
the left having a radius of 197.00 feet, thru a central angle of 39°081.51",
an arc
distance of 134.60 feet; thence N67°58'29"E 380.92 feet;. thence N31°27'12"E 204.86
feet to aforementioned "Point A"; thence N80°04'48"E 232.00 feet; thence 542°06'08"E
215.00 feet; thence 531°14'05"W 358.99 feet; thence S47°10'O1"E 71.34 feet; thence
east 114.27 feet; thence south 68.91 feet to the southerly line of said Tract 25;
thence along the southerly line of said Tracts 25 and 26, the following courses and
distances: N88°15'00"W 180.65 feet; 163°07 '25"►I 154.51 feet; N27°21'32"E 387.32
feet; N83°17'25"W 171.17 feet; S46°22°22"W 324.66 feet; S72°37'52"J 458.93 feet;
N70°54'02"W 354.53 feet; 573°56'01"W 130.08 feet; and 541° 16'07"W 316.18 feet to the
north boundary of a tract of land deeded to King County and described under King
County Receiving Number 6607786; thence westerly along said north boundary on a curve
to the left, the center which bears 539°41 '39"W 627.46 feet thru a central angle of
39'41 '39", an arc distance of 434.70 feet; thence north along said north boundary
25.00 feet; thence west along said north boundary 245.69 feet; thence north 156.13 .
feet; thence N50°39' 19"E 330.21 feet; thence S78°41 '24"E 180.00 feet to a point of
curve; thence on a curve to the right, having a radius of 195.01 feet. thru a central
angle of 78°41 '24", an-arc distance of 267.83. feet to the TRUE POINT OF BEGINNING.
Containing 382,725 square feet or 8.786 acres more or less. .
•
•
•
o�:F' «'1'R?l�lU �'ti •f /f .1 ►;•`•. i/''41 f ��ti �g• Wi' 1 1�t •' f d• (N•••N\ 'Z P' 4 •'ill,-'Y� t F•t'#'�".1. :'r ;!L 4�.'.
•�a' 'l • 1 •`�!}1°a.i_ ��i �1 J 1.� ..{�.d ]t._/ I�.. �' •-1---� .F .��1Y wi=I' • �45...��'.'A.� r .
•
EXHIBIT 9 TO
AGREEMENT
•
1 . The portions of the Greenbelt Property and the Flood
Control Property located .within Parcel A are subject
to the following: ,
(i ) Rights, reservations, covenants and
restrictions contained In that certain Supplemental
Agreement, recorded as Instrument No. 8012230800 in the
0) Records of King County, Washington;
vI
u)
O (ii) Rights, reservations, covenants and
O restrictions contained in that certain Real Estate
..q Contract recorded as Instrument No, 8009300609 in the
CO Records of King County, Washington;
(iii ) Easement recorded under Instrument No.
6626569 in the Records Of King County, Washington;
(iv) Easement granted to the City of Renton on
November 14, 1962, under Application No. 27583 ; and
(v) Easement granted to King County Drainage
District No. l on August 11, 1960, under Application No.
25422 .
2. The portion of the Greenbelt Property located within
Parcel B is subject to the following:
•
(i) Rights, reservations, covenants and
restrictions contained in that certain Real Estate
Contract recorded as Instrument No. 8009300611 in the
Records of King County, ; Washington; and
(ii) Easement recorded under Instrument No.
6626569 in the Records of King County, Washington.
3. The portions of the, Greenbelt Property and the Flood
Control Property located within Parcel C are subject
to the following :
(i) Rights, reservations, covenants and
restrictions contained in that certain Real Estate
Contract recorded as Instrument No. 8002220257 and in that
certain Quitclaim Deed recorded as Instrument No.
8110210021 in the Records of King County, Washington;
( ii ) Rights, reservations, covenants and
restrictions contained in that certain Real Estate
Contract recorded as Instrument No. 8004240435 in the
Records of King County, Washington;
•
12/27/82
7794B 1
(iii) Rights, reservations, covenants and
restrictions contained in that certain deed recorded. under
Instrument No. 5780049 in the Records of King County,
Washington;
( iv) Easement granted to the City of Renton on
November 14, 1962, under Application No . 27583 ;
(v) Easement recorded under . Instrument No.
8108200425 in the Records of King County, Washington; and
0 (vi) Easement granted to King County Drainage
District No. 1 on August 11, 1960, under Application No.
25422 . •
i7
1-i •
0
•
GO
•
•
•
•
•
•
•
•
a?J3'1TC 311 ,JiP,0
.1,2/27/82
7794B • 2•
Nor - 1 5 4"•6t
REG•T FOR CERTIFIED MAIL
NO INSURANCE COVERAGE PROVIDED—
NOT FOR INTERNATIONAL MAIL
(See Reverse)
SENT O
Mr. Del Bonds
STREET AND NO.
P.O. Box 66101
P.O.,STATE AND ZIP CODE
Seattle, OVA 98166
POSTAGE $
CERTIFIED FEE
en
W SPECIAL DELIVERY
W
la.
ce RESTRICTED DELIVERY
CC w 'i" SHOW TO WHOM AND DATE
I— 9 DELIVERED
ce
HLLI
H SHOW TO WHOM,DATE,AND
y a a ADDRESS OF DELIVERY
o
W SHOW TO WHOM AND DATE
a z DELIVERED WITH RESTRICTED
cn
t/f o z DELIVERY
SHOW TO WHOM,DATE AND
ca
w ADDRESS OF DELIVERY WITH
z RESTRICTED DELIVERY
m $
6- TOTAL POSTAGE AND FEES
ti
POSTMARK OR DATE
0o
Co
N
0
ran
STICK POSTAGE STAMPS TO ARTICLE TO COVER FIRST CLASS POSTAGE,
CERTIFIED MAIL FEE,AND.CHARGES FOR ANY SELECTED OPTIONAL SERVICES.(see front)
you want this receipt postmarked, stick the gummed stub on the left portion of the address
ide'of the article,leaving the receipt attached,and present the article at a post office service
window or hand it to your rural carrier. (no extra charge)
2. If you do not want this receipt postmarked, stick the gummed stub on the left portion of the
address side of the article, date, detach and retain the receipt, and mail the article.
3. If you want a return receipt,write the certified-mail number and your name and address on a
return receipt card,Form 3811,and attach it to the front of the article by means of the gummed
ends if space permits.Otherwise,affix to back of article.Endorse front of article RETURN RECEIPT
REQUESTED adjacent to the number.
4. If you want delivery restricted to the addressee, or to an authorized agent of the addressee,
endorse RESTRICTED DELIVERY on the front of the article.
5. Enter fees for the services requested in the appropriate spaces on the front of this receipt. If
return receipt is requested,check the applicable blocks in Item 1 of Form 3811.
6. Save this receipt and present it if you make inquiry.
GPO 197R -256-915
3
ccn ®SENDER: Complete items 1,2,and 3.
71 Add your address in the"RETURN TO"space on
i reverse. -.,
m 1. The following service is requested(:.:.eck one.)
0 Show to whom and date delivered r '7 i ¢ ri
• 0 Show-to whom,date and address of delivery.f. e 4 �� i,
0 RESTRICTED DELIVERY
co Show to whom and date.delivered ' _cr
❑ RESTRICTED DELIVERY. , •
. Show to whom,date,,and address of delivery.$_.
(CONSULT.POSTMASTER FOR FEES) 7 i.
2. ARTICLE ADDRESSED TO: .
,'p Mr. Del Bonds , '
c P.O.Box 66101
xi
z Seattle, Washington 98166
a
n 3. ARTICLE DESCRIPTION:
E9 REGISTERED NO: CERTIFIED NO. INSURED NO..
.0
,74, •
115428
1n
17 . (Always obtain sag:attire of addressee or agent)
ill
m I . ' received • article de ribed above.-
X SIGN:: URE dllf ddrossee utharized agent
iraI, Ge
12 , 1'
c 4.
37. DATE OF DELIVERY PO AR
in
C cz4 ZCI6t 02
'Z S. ADDRESS iCamp:ete only if-re. > -
1� nr '
F 1
70 �
6. •Uf,IABLE-TO DELIVER,SECAUSE: `!'� :1`M s _
I •
'' GPO:1979-300-463
I IMITED STATES POSTAL SERVICE •
. OFFICIAL BUSINESS ''.;'
PENALTY FOR PRIVATE *
SENDER INSTRUCTIONS USE TO AVOID PAYMENT
Print your name,address,and ZIP Code in the space below. OF POSTAGE.Saga
• 'Complete items 1,2,and 3 on the reverse. ' �+
• Attach to front of article if space permits,
otherwise affix to back of article.
IITIMISIMMII
• Endorse article"Return Receipt Requested"
adjacent to number.
RETURN , -',
TO „7
' CITY OF RENTON, BUILDING & ZONING DEPT.
. - (Name of Sender) . - .
200 MILL AVENUE SOUTH •
' ' (Street or P.O,Box) '.. '
RENTON, WASHINGTON 98055
(City,State,and ZIP Code)
4-44-to El
-
L lAyi' 7-6-}virc
6-rates,?Mks 54,61/64ip
? Rrc 77'1'
4,47 w4- V031
- -
I
To �s G ' GC'�
Date N__ a Time A` all
.., ),Id, ILE YO, WERE OUT
/`✓lam.-- T G G-0za-t��.r�
of (J
Phone � e del //
TELEPHONED PLEASE CALL /
CALLED TO SEE YOU WILL CALL AGAIN
WANTS TO SEE YOU RUSH
RETURNED YOUR CALL
MessageK. .� `�'
jr,
.
Operator
t
•
. up
.
BEGINNING
d'
, •
F FILE
--- ,
0411. ' 11) .
•
FILE TITLE
I (
,:, u 4 ...
i ')
I
6,„
If
I ...... . 9
,
.. 3 47: • Jr.l l.• N:_v�" .4 L2wr'^ 1
4.
1.
i. _ - S•s°. ,:?; i« '.a. -i.v '�'• �,.0,;. '-: . :ti:-,`_�,s"'f. ^t1''�'h+'A!
.1 rs.ir •1 • _ 'A M.,:t'rf,YAy •°r.:7•°ys}.:;,.0:..,p+,.. .,. ,.. '•":L`<; . "•t;:f {(�� . ,fj'T(.,,,
a�';+t :1'S _i '`�l: (cw,.Pa d.,S P �:{�t�;,rr:., ' •
-.y :, '''. ''` '�i'r'',ta:r:�,� :4:Y..•;>.lv;:'i'•,,``(:d:',.•tra';•4��«.�. .• v'• 'k•' -•'•
.�ai{` ;:7;)'' .. • _ ik,'.:,s7; ;.jd;r ':T..'-'.r,:'• f',;;• :'i.. :,e,Y;7'r
• :'a,^ — - „,j i';r'>I.,, _w ., iA;^;:3;#''+r'i..;:''.73J.4,, ,;.r'-:.r� __
. '•s.``��'i'•' .y r,':y:_i•.: ..:. r:I t�;i. fti.r' .,.4...°a': ..r'.^„c _ '�,,• '�'"`•mot,. -
llt ,( r, •�, ,..%-,,�•:'. '�i'I:'.::..o'l.w Y�'."'�M.•�• J,f-• -/•r:> r' il�>t.±n
!r ..'J,' „1. `h��rN r ,.F. ;�1 . �.,.3'tt�>cy �ye
t • d V t e r•37: K na{
�(�
+rya•. li' )
"'i 'ir F en'.•
;
f N�'
r.d`•a t:,.,•'_.'.,.-.:x;• {-=i^� fie,. .}• .a.
i I� 9 '�{.r. :J^ .4 i •Y .,•G .7 w-4�'i.*.��i'• r r
� s• J ,I + t r,.
;lid-� }+
�,n y
{ • it=
�� —S
:Si-.
*'J __,ea. A'� �'�r�,� tt• ;. iS
k ''
•
'.r t r; t • Applicant Al terra Corp.
.`fig: `rT''` File No. R-129-80
' ; i''`�` •
i '•,if • • Project Naze Black River Forest Office Park . , '
•
1 f''4'-';:; ' Property Location North Side of S.W. 7th St. . east of
' ''"'• "4•'"' the proposed P-1 Channel . south of the old Chicago
.,4 milwaukee RR, and west of Thomas Ave S.W. •
• w` , HEARING ,EXf4MINER: Date July 29. 1982
' .r,, Recommendation Approval with conditions •
f :?;
"�`11tg:`a°'` Date Response
:-�:;'it Req./Rec. Date Received P
i; ;; i.,,: . • Appeal - Date Received '
Mkt '",' .
t k :'•.;- , - Date
ror .,,ti'; Council Approval , '
'" i' •
`' Ordinance/Resolution # �, Date /„2 o?7�R
' '° �' Mylar to County for Recording . '
• "iri Mylar Recording # :. .
•
•
'• '; r'. . • Remarks: R 14m .C : 1.1 i✓!4 IO, •
. ‹ -t::` .: 301 050S39
1.....1" i'??1712:,‘ """ " • alki5IKA3 icrOOTarrNO g.49 riutAturri\,
t-.'lfr.C.'i trp� 1
•
•
.1,....• .�.r,r`, te.-�:
•
t °�h�Jkv; !r
Y.EE..P .9'j� iil�i' Y y . _7 • '(• • I '
'7 'Q .s
r• • f.:
r °
J^^. JJ ;r:'Ai? ttlrr "i'':�• ..i'^ *Yi"L'•+'La, a,Y'^ .'1'.. 1'7v:- N j„ � .,f'�
r�4 *41
4}.a "A 5" h�P`, ..•rC .#j: ni' '.V :i'F•r "'v t t :.o-L :h''i;'; :��
'� �. .F '
••e4,.:,,sfg }, G, *i �r bi FJ.J. 7 !l' fir' `SA4 '. y q., 7t ti4 sU {'"U • me
!}r;at„pr . o ;� � �.Ti�i''J ii1 �+¢.,ti,.•y�rr •-'�k�a ]fY ,ry., r 7 ;+ Y�rz,Pq'��r Y.c'�''S� .r x SY'.`I'6 t1 i^y`.t• .t`f
x : x .ri` k,.5 I�•. Y i•, • vAr r '.' ,,�+ -F +ai t t' ..I :i t `'t ` f ;•i,l i! ' ,
, flositSklip,.-•,'.-. -.4" :
S•
Ai. 1 4
.,i}.. ' '�"« .v--•-• �,«.."Nitt i%t.E.!..7t'rs;?ai5r Ltii„"-.to^N;3,{5 1, ,!. s, :41 ,.sv r. • a ., , . 1 ;'.- P ,.R
CITY. OF RENTON
LAND USE HEARING EXAMINER
PUBLIC HEARING
JUNE 15, 1982
AGENDA
COMMENCING AT 9 :00 a.m. :
COUNCIL CHAMBERS, SECOND FLOOR, RENTON MUNICIPAL BUILDING
R-129-80 AL'ERRA CORPORATION (BLACK RIVER OFFICE PARK)
Application to rezone a /1 . 16 acre parcel
of G-1 , General Use, to M-P, Manufacturing-%
Park; located north of S.W. 7th Street, east
of the proposed P-1 Channel, south of the
old Chicago Milwaukee St. Paul Railroad Right-of-way,
and west of the extension of Thomas Avenue S.W.
Affidavit of Publication
STATE OF WASHINGTON
COUNTY OF KING ss.
Audrey DeJoie being first duly sworn on
oath,deposes and says that S II e is the chief clerk of
THE DAILY RECORD CHRONICLE,a newspaper published six(6)times a NOTICE
week.That said newspaper is a legal newspaper and it is now and has been PUBLIC HE
for more than six months prior to the date of publication referred to, RENTON LA
printed and published in the English language continually as a newspaper HEARING EX
LA
published four(4)times a week in Kent,King County,Washington,and it is
now and during all of said time was printed in an office maintained at the RENTON, WAS
aforesaid place of publication of said newspaper.That the Daily Record c Public Hean
Chronicle has been approved as a legal newspaper by order of the Superior by the Rei
Court of the County in which it is published,to-wit,King County,
iVOtice of Public Hearing Examiner at his
Washington.That the annexed is a iar meeting in the Coun-
cil Chambers, City Hall, Re-
nt;n, Washington, on June
Hearing .8O62 1 1982, at 9:00 a.m. to
.:.der the following peti-
tion:
as it was published in regular issues(and ALTERRA CORPORA-
not in supplement form of said newspaper) once each issue for a period TION (BLACK RIVER
OFFICE PARK)
P Application to rezone a
1 71.16 acre parcel of G-1,
of consecutive issues,commencing on the General Use to M-P,
Manufacturing Park,File
4 uh day of June 19 82 ,and ending the R-129-80; located north
of S.W. 7th Street, east
of the proposed P-1
� Channel,south of the old
!4 t h day of Jurl? ,19....V 2,both dates Chicago Milwaukee St.
inclusive, and that such newspaper was regularly distributed to its sub- Paul Railroad Right-of-
scribers during all of said period. That the full amount of the fee way, and west of the
extension of Thomas Av-
18 00 enue S.W.
charged for the foregoing publication is the sum of $ , which Legal descriptions of the
has been paid in full at the rate of per folio of one hundred words for the file noted above are on file in
first insertion and per folio of one hundred words for each subsequent the Renton Building and
insertion. Zoning Department.
• All interested persons to
said petition are invited to be
� « 'yG 'CG4 present at the Public Hear-
ing on June 15,1982,at 9:00
Chief Clerk a.m, to express their opin-
ions.
Ronald G. Nelson
L}th
Subscribed and sworn to before me this day of Building and ZoningDirector
Published in the Daily Re-
June 1982 cord Chronicle June 4,1982.
R8062
•
Notary Public in for theState of Washington,
residing at Kera King County.
_ F, d.eral day
—Passed by the Legislature,1955,known as Senate Bill 281,effective June
9th, 1955.
—Western Union Telegraph Co. rules for counting words an• res�i+ '1 Or ,'y i O;y
adopted by the newspapers of the State. L � Pl. l
JUL121982
VN eiaays�ssz BUILDING%Zr NtNG UEPT.
•
OF I
�� © ° BUILDING & ZONING DEPARTMENT
RONALD G. NELSON - DIRECTOR
-
OA MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
O,S,gT 0
6O SEPS`- �P
BARBARA Y. SHINPOCH
MAYOR
JUNE 2, 1982
Mr. Del Bonds
Alterra Corporation
2120-A S.W. 152nd
Seattle, Washington 98166
Re: APPLICATION TO REZONE A 71 . 16 ACRE PARCEL OF G-1 , GENERAL
USE, TO M-P, MANUFACTURING PARK, FILE R-129-80; LOCATED
NORTH OF S.W. 7TH STREET, EAST OF THE PROPOSED P-1 CHANNEL,
SOUTH OF THE OLD CHICAGO MILWAUKEE ST. PAUL RAILROAD
RIGHT-OF-WAY, AND WEST OF THE EXTENSION OF THOMAS AVENUE S.W.
Dear Mr. Bonds :
The Renton Building and Zoning Department formally accepted
the above mentioned application on June 2, 1982 . A public
hearing before the City of Renton Hearing Examiner has been
set for June 15, 1982, at 9 :00 a.m.
Representatives of the applicant are asked to be present.
All interested persons are invited to attend the hearing.
If you have any further questions , please call the Renton
Building and Zoning Department, 235-2550.
Very truly yours,
1-?°15/C# 9 . 1LLA
Roger J. Blaylock
Zoning Administrator
RJB :cl
cc : Mr. Joel Haggard
RECOVED
CITY OF RENTON
BEARING EXAMINER
1 AM
1982
71��9110,1�,12,112i3►415 6
3 Y .
4 BEFORE THE CITY OF RENTON
5
HEARING EXAMINER
6 REGARDING REZONE ) File No. R-129-80
7 APPLICATION FOR BLACK )
RIVER OFFICE PARK ) APPLICANT' S PRE-HEARING
8 ) BRIEF
9 )
10
This rezone application implements the
11
Comprehensive Plan' s Land Use Element, is in the public
12
benefit and should be approved subject to conditions
13
proposed by the applicant .
14
15 THIS REZONE PROVIDES FOR A SENSITIVE AND SENSIBLE BALANCE
BETWEEN LAND PRESERVATION AND LAND UTILIZATION
16
The EIS for this proposal provides a specific
17
opportunity to review the range of impacts that might
18
accompany development of the property subject only to the
19
existing City ordinances and regulations. The EIS was
20
used by the applicant to consider the viewpoints of our
21
agencies and people, by the rezone. And out of this
22
23 listening and learning process has evolved a sensitive and
sensible balance between land preservation and land
24
25 utilization.
26 Utilizing the expertise of Mr. Richard Carothers
27 in informal consultation with City Staff (NOTE: in no way
28
Applicant' s Pre-Hearing HAGGARD,TOUSLEY&BRAIN
Brief a 1 ATTORNEYS AND COUNSELORS AT LAW
1700 DAON BUILDING
720 OLIVE WAY
SEATTLE,WASHINGTON 98101
624-5299
1 . do .we' presume to, suggest..such consultation has resulted. in
2 Staff concurrence) and the owners, a, revised site
3 development master plan was developed. The key elements
4 of the masted plan concept are reflected in Exhibit
5 (to be identified in the hearing) •and provide for
6: i. a) Dedication: of 9. 14 acres to the City
for use solely for the. P-1 Channel and
8 associated facilities;
9 . . b) Preservation of about .10 .52 acres. in
10 . its existing state land, basically. on
11 the western and southern portions of
12 . the site;
13 • . c) Limitation of the maximum gross square
14 footage of building to 995 ,781.5 square
15 ' feet; and
16 d) Establishment of Landscape Guidelines
17 : . , in excess of City code requirements to
18 govern development implementation.
19 Other conditions proposed as part of this rezone are
20 included in our letters of May 25 and. June •10 , 1982.
21 We have also revised the traffic access to ,
22 preclude road construction through the western portion of !
23 the site. As Mr. David, Markley 'of TRANSPO will testify
24 the revised proposal yields maximum traffic impacts within '
25 the range of that already considered in the EIS. So what
26 the revised proposal does is reduce the maximum traffic
27 --
_ 28 --
Applicant ' s Pre-Hearing
Brief 2
1 impact considered in the EIS while at the same time
2 allowing the western portion of the site to be preserved.
3 We however have agreed with Mr. Houghton' s recommendation
4 for development traffic studies (See Haggard, Tousley and
5 Brain letter of June 10 , 1982 ) so further refined review
6 will be assured.
7 Itiis strange that the, Staff report mentions
8 little of anything as to the extensive, good faith efforts
9 the owners. hs gone to in assuring a sensitive and
10 sensible balance between preservation and utilization. We.
11 recognize that Staff has obliquely inferred that the
12 dedication of the P-1 channel , area is of public benefit.
13 And surely it .is for such dedication will accellerate the
14 timetable and provide substantial savings to the City
15 ( i. e. , about $400,000 to $500 ,000) . The Staff apparently .
16 discounts this by saying that the rezone should not be
17 predicated solely upon this issue. Certainly we agree -
18 but it is a significant, though not sole, reason. As
19 discussed below there is a presumed public interest since
20 the rezone exactly implements the Comprehensive Plan. And
21 there is a public benefit in also preserving an added 10. 5
22 acres.
23
THIS REZONE PROPOSAL NOW IMPLEMENTS THE CITY'S
24 COMPREHENSIVE PLAN
25 The Court of Appeals (Division II ) stated in
26 . dicta that a , nonproject zoning action has no immediate or
27 --
28 --
Applicant ' s Pre-Hearing. .
Brief 3
l measureablelenvironmental consequences. See Ullock v.
2 Bremerton, 17 Wn. App. 573, 581 (1977 ) . This is
3 self-evident when considering only the, action of zoning.
4 For indeed subsequent proposals to develop rezoned '
5 property entail separate governmental review of what is
6 proposed and its projected environmental . consequences.
7 While it is ,appropriate (in fact necessary) under SEPA to
8 consider the total proposal, i .e. , zoning 'and development
9 enabled thereby, ' SEPA. provides' no basis for enlarging the
10 City' s scope, of decision-making with respect to zoning
11 . decisions. See RCW 43.21C.060. This conceptually has
12 '' been discussed by the Court of Appeals (Division II ) in
13 dicta when it wrote in Ullock v. Bremerton, supra, that:
14 ; " . . .It would be unreasonable to require
every rezoning petition to be accompanied by
15 'a' site plan solely to generate exact
environmental consequence information. . .
16 j It would also make zoning changes depend
upon development projects, rather than
17 desirable long 'range`:planning . "
18 This rezone proposal is properly reviewed as a
i
19 planning effort. implementing the City' s Comprehensive
20 ' Plan.: As a planning activity, this rezone exactly
21 implements the City' s Comprehensive Plan. Revised just
22 . recently (January, ' 1980) the Renton Comprehensive Plan
23 , ' designates the site for light industry or manufacturing
24 park. That is exactly what we are requesting. The more
25 , specific Green River .Valley ' Comprehensive Plan done about
26 3 1/2 years earlier recommended manufacturing park. That
27 -- �.
'28. --
Applicant 's Pre-Hearing .
Brief , 4
1
1 is exactly what we are requesting. Both these plans are
2 adopted policy of the City and this rezone should be
3 granted as an "official control" implementing those
4 plans. [Welrequest the Examiner to take. Official Notice
5 of each P'lari' s land use designation for the site] .
6 Land Use planning involves both the development
7 of a Comprehensive Plan and official, controls to implement
8 it . One fundamental control is zoning . The City has no
9 adopted regulation establishing that rezones are to be
10 withheld until all other land zoned as the rezone requests
11 is used. Inldeed, such an approach is the antithesis of
12 proper planning and contrary to the Ullock case' s
13 reasoning since this approach wold coerce rezoning to
14 depend upon specific development projects. Accordingly,
15 the City's contention that this zoning is premature due to
16 the existence of unused MP zoned proper is inappropriate
17 But, the Staff' s contention that the zoning is
18 premature also ignores critical facts distinguishing this
19 site from others. The City, in its own EIS for this
20 proposal, admits that this zoning action may be considered
21 as "in-filling. " See pp. 57, 68 Final EIS. And indeed
22 ' the specific facts of this case support independently that
23 conclusion due to Earlington Park on the south and a
24 natural topographic break ( i . e. , the railbed) on. the
25 north. The Hearing Examiner' s prior findings in the
26 Earlington Park case (PP-056-80 ) affirm this. Conclusion
27 --
28 -- .
Applicant' s Pre-Hearing
Brief 5
•
#5 in. the Examiner ' s, report. of April .28, 1981 affirms the
2 area ( i .e. , IEarlington Park and Black River Office Park)
3 • as unique d e to adjacency,. to rail spurs and just north of
4 I-405 and the Valley Freeway (SR-167 ) . (Note: Official
5 Notice is requested of this Conclusion) . Further the
6 City' s own EIS affirms that this site is "unique" as one
7 of the two sites in the Valley equipped with reciprocal
8 switching frlom two railroad lines without penalty to the
9 shipper, in post cases. Page 69, Final . EIS. Rezoning of
10 this admitted infilling of a unique site is accordingly
11 appropriate .°IIregardless of any other undeveloped similarly
12 zoned land currently existing in Renton.
13 Staff finally suggests that this rezone does not
14 comply with !the intent of the Plan' s goals and policies.
15 This is' simple unsustainable as a matter of law. The City
16 Council is presumed mindful of all goals "and. policies . in
17 its Comprehensive Plan when it made the legislative
18 decision to establish land uses for specific . areas. Staff
19 is in effect subverting this legislative determination
20 with its own thoughts. Besides, as a general rule
21 specific controls over the general; and so the specific
22 land use designation controls and M-P zoning is
23 appropriate and presumptively in the public interest .,
. 24 Let ' us not forget what is printed on the bottom
25 of the Comprehensive Plan map handed out by Staff.
26 1 "The Land Use Element of the Comprehensive
, Plan is an' official' public document adopted
27 --,
28
Applicant ' s Pre-Hearing
Brief 6
1 j by the City Council as a policy guide to
decisions regarding the physical development
2 of the community. It indicates in a general
way what the people of the community
3 consider as desirable future land use
development. "
4 '
And that is exactly what this rezone request will do -
5
implement' by. an official control of zoning the
6 .
Comprehensive Plan. -
7.
8 CONDITIONS ON . THE . REZONE PROPOSED BY APPLICANT ARE
APPROPRIATE I '
9 j
The zone classification for a parcel' of property
10
provides extensive conditions affecting its use. Other
11
established ordinances of the City; alsodetermine how a
12
property is ,to be us.ed. And this body of restrictions
13 ,
upon property use shuld be sufficient as a matter of law.
14
Applicant ha's' gone further in volunteering to constrain
15 '
the eventual' property development by proposing 15
16 i
conditions. , The first thirteen are contained in our
17
letter of May 25, the fourteenth in our letter of June 10 ,
18
and the fifteenth is the Landscape Guidelines transmitted
19 '
to. the City on:June 10, 1982. In this writer' s experience
20
seldom has any applicant gone so far to assure voluntarely
21
that conditions on a rezone are developed to protect the
22
public and, the owner.
23
There. appears only to be three disputes . over
24. t ;
conditions -' although the City has largely ignored any
25 ,
26 comment on applicant ' s voluntary specification .of
conditions.
27
28
Applicant 's Pre-Hearing
Brief . .
•
1 First: Staff seems unwilling to accept the P-1
2 channel area dedication even though it saves the City
3 substantial time and money. We are willing to make this
4 dedication provided that the area be used for the purpose '
5 of dedication within a reasonable time period.
6 Second:. the Staff has demanded an added two
7 acres or so ,for ,preservation. Actually, th'e difference
8 may be slightly less; a) Applicant preserves 3 .91 plus
9 6 .61 acres or 10 .52 total; .b) City. demands 3.5 plus 8 . 5 or
10 12 acres. Mr. Richard Carothers made extensive site
11 evaluations In his capacity as a professional landscape
12 architect and. recommended 10.5 acres,, which applicant
13. reluctantly agreed to. Mr. Carothers will explain his
14 rationale considering the total site- and upon this basis
15 we believe that the Examiner will agree with Mr. Carothers.
16 Third: The Staff argues that we should maintain
17 the current one hundred year flood storage volume of, water
18 - and we agree, See, Condition 5, Haggard, Tousley &
19 Brain letter' of May 25, 1982. But the City asserts this
20 .. is a surface, elevation of 17 .1 feet msl - and we
21 disagree. The 100 year flood plain elevation is and has
22 been uniformly applied by the City as at an elevation of
23 15 feet msl in this area. To impose a higher elevation on
24 this one property is unconstitutionally discriminatory and
25 unsupported in: the :record. To require applicant to
26 provide additional storage beyond 15 feet msl also would
27
28 --
Applicant ' s Pre-Hearing
Brief 8
I ,
1
I constitute an unconstitutional taking since any added
2 storage is excessively conservative and can only be
3 related to upstream owners and the general public . Mr.
4 Jerry Rasmussen (Entranco) will provide testimony
5 supporting applicant ' s. position. And such testimony will
6 establish° that the ERC recommendation is improper.
7 Perhaps it is short sighted for this writer to
8 argue that there is a way out of this apparent problem
9 involving the storm water storage volume condition. For
10 Staff argues that this application should be dismissed
11 without prejudice and reheard when the FEMA study is done
12 (Q. This would require applicant to refile and pay another
13 application fee) . Staff admits (Para. L.10 ) that such a
14 study will b,e usable to more precisely determine the
15 site' s development potential. This admits that 1) the
16 study is not' needed until devlelopment of the site is
17 proposed (See Ullock v. Bremerton, supra) , and 2 ) the City
18 can evaluate' .development potential now without the study.
19 What we suggest to resolve the problem is a solution
20 inferred by this Examiner ' s Finding #18 in the Earlington
21 Park case (File PP-056-80) . That is, require the owner to
22 maintain the current one hundred year flood storage volume
23 of water, except as this is partially or totally provided
24 by use of the property for the P-1 channel. This could be
25 added to our ,Condition #5 proposed' in our May 25 , 1982
26
27
28
Applicant' s Pre-Hearing
Brief 9
1 letter.
2
3 DATED this llth day of June, 1982.
4
5
Respectfully Submitted,
6
HAGGARD, TOUSLEY & BRAIN
7
9 Joel Haggard
10 cc: , Mr. Roger Blaylock
Mr. Del Bonds
11
12 5369B
13
14
15
16
17
18
19
20
21 •
22
23
24
25
26
27
28
Applicant ' s Pre-Hearing
Brief 10
sTnrE //e4e "/r!/ .C/t�l!/
t.JOHN " lei'. 4.
•
�^ SPELLMAN I s3,: '•.- J FRANK LOCK/
Governor y,.1B89 a° Director
• STATE OF WASHINGTON
DEPARTMENT OF GAME
600 North Capitol Way,GI-11 • Olympia, Washington 98504 • (206)753-5700
June 1, 1982
CITY OF RENTON
Mr. Gordon Erickson JUN 11982
Renton Planning Department PouCY
Municipal Building DEVELOPMENT DEPT.
200 Mill Avenue South
Renton, Washington 98055
RE: Renton Wetlands
Mr. Erickson,
On May 24 members of our staff visited an important wetland that
is scheduled to be filled for Valley Office Park 2. We were at
the site at noon and not at a time that is best to observe wildlife.
Even so, we saw bittern, gadwall, mallard, coot, and red-winged
blackbirds. Great blu heron, ruddy duck, cinnamon' teal, Canada
goose, marsh wren, shrike, red-tailed hawk, violet-green swallow,
tree swallow, meadowlark, and muskrat have also been reported at
this marsh. The pond 'could support spiny-rayed fishes. Its
vegetation consists of yellow iris, cattail, and rush. The wetland
is a critical wildlife' habitat, and all wildlife dependent upon it
will perish when the site is filled. This area and similar wetlands
could be incorporated into an urban wilds system in the city that
could take advantage of the values of these areas for the public' s
benefit. We have enclosed some information on the values of
wetlands. We would be happy to visit wetlands and other critical
sites with members of your staff to provide early information.
We did not receive you* declaration of non-significance when you
issued it in 1979 even though the proposal includes loss of critical
wildlife habitat.
In 1980 we wrote you arid stated, "Many wetlands are being filled
in the Renton area for 'Iindustrial expansion. Since marshes, bogs,
and swamps are important wildlife resources, we are concerned when
they are lost, especially without compensation, mitigation, and
public review. . .Landfill or work in wetlands may require permit
from U. S. Army Corps of Engineers or Hydraulic Project Approval
from our agency and the Department of Fisheries. Work done without
proper permits would be illegal and could be subject to removal. "
•
Mr. Gordon Erickson
June 1, 1982
Page Two
Since all land (except what has been filled and/or developed) to
Springbrook Creek appears to be wetlands, the Corps of Engineers
could require a 4041permit for fill in this area.
1
We request you sendlus your declarations of non-significance (plus
environmental checklists) and your environmental impact statements
on all projects that require SEPA compliance and are near or over water
and wetlands. With Hydraulic Project Approval, we are an agency with
jurisdiction and interest.
We hope to work with you and your staff to ensure consideration of
public resources in the city' s land use planning. Please call us at
753-3318 if we can set up a meeting or visit critical sites in Renton.
Sincerely,
{
THE DEPARTMENT OF GAME
44—
Bob Zeigler, Applied Ecologist
Environmental Affairs Program
Habitat Management Division
BZ :cv
Attachments
cc: Agencies
Region
s1'nre
•
•
JOHN SPELLMAN I ' , '� ,• FRANK LOCK
Governor ,A89' v Director
STATE OF WASHINGTON
DEPARTMENT OF GAME
600 North Capitol Way,G1-11 • Olympia, Washington 98504 • (206)753-5700
May 26 , 1982
Debra E. Mets
13016 S.E. 236th Place
Kent, Washington 98031
RE: Renton ' s Declaration of Non-
Significance for Austin Company
Valley Office Park 2 , King County
Ms. Mets, '
You requested our comments on the City of Renton' s declaration of
non-significance for Valley Office Park 2 (the Austin Company' s
application for filling and grading of approximately 300 , 000 cubic
yards of material on a 29-acre site along East Valley Road) . The
declaration of non-significance was issued by the City of Renton
on April 12 , 1979.
Unfortunately, we were not sent a copy of the declaration of non-
significance in 1979 (even though we are an agency with jurisdiction/
expertise) . We appreciate you sending. a copy of the declaration
and environmental checklist. After a site investigation, we have
the following comments.
With the exception of what appears to have been filled, almost all
the land between Springbrook Creek and the property appears to be
wetlands. On the property there is a one to two-acre pond
surrounded by marsh. Vegetation in the marsh consists of yellow
iris, cattail, and rush. Across the fill that serves as a road,
there is another extensive marsh-swamp wetland with cattail being
the predominant vegetation, but also finding pondweed, iris , rush
willow, and snags.
These habitats are critical for wildlife resources, especially
waterfowl and furbearers. They not only provide nesting areas
for waterfowl, but are located in a major flyway and serve as
important resting and feeding areas for these migratory birds .
While we did not sample the pond for fish, it is capable of
supporting spiny-rayed fishes. We observed bittern, gadwall,
mallard, coot, and redwing blackbird in a noontime visit. As you
know, great blue heron, ruddy duck, cinnamon teal, Canadian goose,
marsh wren, shrike, red-tailed hawk, violet-green swallow, tree
swallow, meadowlark, and muskrat have been reported at this marsh.
3
• Debra E. Mets
May 26, 1982 •
Page Two
When fish or wildlife habitat is lost, the wildlife dependent upon
that habitat is lost; it perishes. All habitats will fill to their
capacity. That is,, habitats will naturally hold all the wildlife
possible. When wildlife is displaced or forced to a habitat that
is already filled ,to capacity, starvation or disease will reduce
the wildlife population to its original limits . When habitat is
lost not only do displaced animals perish, but that number of
animals is, in effect, eliminated each year because all production
is eliminated.
When a wetland is filled not only are public resources lost, but
other human values of wetlands are also lost. For example, once
filled the area will no longer provide flood and drainage protection
nor will it have the recreational value that these urban wilds now
have. Boeing workers and others use these areas for their aesthetic
value, a respite from the urban environment, and an opportunity to
observe wildlife.
The environmental checklist appears to have some inaccuracies . If
the pond is filled there would be a change in the amount of surface
water. Fill in wetlands will increase storm water flows and eventual
discharges to Springbrook Creek (checklist item (3) (d) ) . Wetlands
clean storm water and surface water. When wetlands are removed, water
quality in a drainage area can be reduced (checklist item (3) (e) ) .
Fill placed in the wetlands will serve as a barrier to the establish-
ment of wetland vegetation (checklist item (4) (c) ) .
As we mentioned before, the proposal would reduce the diversity and
numbers of wildlife in the area. The area supports a more diverse
fish and wildlife habitat than the rabbits and field mice mentioned
(checklist item (5) (a) ) . Fill in these wetlands would produce a
loss of critical and significant wildlife habitat (checklist item
(5) (d) ) .
For the above reasons we would not concur with the "no" answers for
items (3) (d) , (3) (e) , (4) (c) , (5) (a) , and the "maybe" answer to (5) (d) .
Thank you for your concern for the public' s fish and wildlife resources .
We hope you find these comments helpful.
Sincerely,
TH DEPARTMENT OF GAME
3)--(_) 3.7e_
Bob Zeigler, plied Ecologist
Environmental Affairs Program
Habitat Management Division
BZ:cv
cc: Agencies
Region
7i:,'imF ri.
`III�)I r �Ilhy
• JOHN SPELL MAN s��j1 �'' FRANK LOCKA
Governor ''� N„ Director
STATE OF WASHINGTON
DEPARTMENT OF GAME
600 North Capitol Way,G/-11 • °Olympia, Washington 98504 © (206)753-5700
WETLANDS AND STREAM CORRIDORS
CRITICAL AREAS WORTH PRESERVING
Wetlands are .those areas with peat or muck or other wet soils or that
support vegetation that requires or allows saturated soil conditions.
Wetlands include marshes, bogs, swamp, intertidal areas, sloughs, potholes,
wet meadows, wet forest, river overflows and natural ponds.
Riparian areas are those areas adjacent to a stream, wetland or lake, that
directly or indirectly affect the natural character of that water. Examples
of riparian areas include stream corridors, flood plains , and buffer strips.
Wetlands and riparian zones have substantially higher fish and wildlife use
than other terrestrial habitats. These areas are in relatively short supply
and a large percentage of species found in these areas are highly vulnerable
to habitat modifications. When wetlands and riparian areas are altered, im-
pacts on fish and wildlife can be severe. The relationships that exist be-
tween the water, intermediate, and upland environments are intertwined into
a natural system that can be severely upset when a component is removed.
Ecosystems can be viewed as a flow of energy from producers to consumers.
As much as 90 percent of the energy processed into a stream comes from stream-
side vegetation. This energy is transferred to aquatic insects such as caddis-
fly and onto trout and salmon. Streamside vegetation keeps stream temperatures
cool by shading and plant litter, adds to the humus content of the soil and
reduces erosion that comes from stormwater and raindrops. Vegetation filters
stormwater runoff and maintains water quantity. Wetlands adjacent to streams
serve as sponges. They store water in winter and help control flooding. In
summer, these wetlands dry out and release their water to the stream and help
maintain quantity of water in low flow periods. What happens in the watershed's
uplands has a direct effect on fish and other aquatic organisms.
•
Page 2
WETLANDS AND STREAM CORRIDORS
CRITICAL AREAS WORTH PRESERVING
Because of the inter-relationship that exists between aquatic and terrestrial
systems, it is in general , wise to follow the advice of Aldo Leopold who said
in 1941 , "A prudent technology should alter the natural order as little as
possible. "
e i
Values
•
Wetlands and riparian areas have value beyond fish and wildlife. They include
1
natural valley storage, 1tertiary water treatment, sediment basins, recreation
areas, educational and scientific opportunities and aesthetics. Replacement
costs for these "free work" functions are usually quite high; stream rehabilita-
tion, dams,: hatcheries, treatment plants, and levees. The Environmental Impact
Statement on King County's General Development Guide states, "In addition to
their biologic functions, wetlands perform a valuable hydrologic function by
providing storage and partial retention of storm water. For example, a 6 inch rise
in water level over a 10 acre marsh will provide a temporary storage and sedi-
ment trap for 1 . 5 million gallons of storm water. "
•
Stream corridors in urban areas are frequently used for picnics and areas where
urban workers eat lunch and get away from the "concrete jungle". In residential
areas, streams provide local residents with a natural area close to home.
People pursuing recreation in these wildlife areas (bird watching, photography,
hunting, fishing) contribute to local economies as they pay for food and lodg-
ing, buy film and supplies. In some areas these recreationists are the mainstay
of the local economies. Because of these values, a recent study shows a greater
economic value can be realized from retaining a 100 foot buffer strip along
streams in a, logging operation than could be realized from harvesting and sell-
ing that timber.
Page 3
WETLANDS AND STREAM CORRIDORS
CRITICAL AREAS WORTH PRESERVING
Planning for Fish and Wildlife in Land Use Decisions
•
Since natural resourceshave not figured into land use planning, significant
losses have occurred to fish and wildlife resources as open space land is con-
verted to other uses. EPA performed a study on stream invertebrates in the
Renton area. They found an inverse relationship between percent of urbaniza-
tion in a subdrainage basin and percent of important fish food organisms. They
conclude, the greater the increase in urban acres, the fewer fish in a stream.
Studies have shown that when habitat is altered, significant reductions of
wildlife species usually occurs.
The impacts of land use changes need not be as severe as they are. A California
study showed that when 100 foot buffers were left along streams in an area that
was logged, no impact of sedimentation was measured in the stream. However, when
less than 100 feet was left, stream sedimentation was large enough to cause a
change in the aquatic insect communities that create the components of fish diets.
This would indicate that the minimum riparian vegetation necessary to filter silt
from stormwater is 100 feet.
In. the eastern United States , regional extinctions of wildlife are occurring
because large patches of forest are decreasing in size and because these frag-
mented forests are beooming isolated from larger forests which act as reservoirs
for wildlife populations. Large patches of forest open space can be connected
by corridors or bands of woodland along streams. If trees are maintained along
streams, urbanized areas can benefit from the more extensive forests to which
they are connected.
Size of Corridors
Whenever possible, the Department of Game recommends that buffer strips extend
4
for 200 feet from the water or wetland's edge. A minimum of 100 .feet should be
the rule. Narrower buffers can be tolerated in some cases, but often a wider
buffer must be used to protect water quality and habitat values.
•
Page 4
WETLANDS AND STREAM CORRIDORS
CRITICAL AREAS WORTH PRESERVING
Land Use Planner, Ian L. McHarg recommends in his book, Design with Nature
(1969) -. "Surface water courses should be retained in their natural condition.
to a width of not less! than 200 feet on each side of the stream. In general ,
they should not be Cultivated. " (page 86)
The. California Coastal Commission Statewide Interpretive Guidelines , 1981 ,
discusses criteria for buffers. "The buffer area should be a minimum of 100
feet for small projects on existing lots (such as one single family home or
one commercial office building) unless the applicant can demonstrate that
100 feet is unnecessary to protect the resources of the habitat area. If
the project involves substantial improvements or increased human impacts,
such as a subdivision, a much wider buffer area should be required. "
"For wetland, the buffer area should be measured from the landward edge of
the wetland. For a ,stream or river, the buffer area should be measured landward
from the landward edge of riparian vegetation or from the top edge of the bank
(e. g. , in channelized stream) . "
•
Why Should Buffers'Be Required
Buffers along sensitive areas help preserve public resources such as water
quality, -fish, wildlife, recreation, and aesthetics. However, there are reasons
other than high quality of life, healthy environment and public good for pre-
serving these areas. These areas provide economic return from wildlife as well
as sports, commercial and Indian fisheries. The Orrick decision on Treaty Indian
Fishing Rights stated that as a result of the treaty, tribes are guaranteed the
right to have fish habitat protected from manmade destruction. Indian fishing
rights and protection of their fishery habitat takes priority over other econo-
mic benefits.
•
Page 5
WETLANDS AND STREAM CORRIDORS
CRITICAL AREAS WORTH PRESERVING
By preserving these arelas we have passive recreation sites and preserve
some of our quality ;of life so that it might be passed onto our children
and their children. . AsIconservative U.S. Senator James Buckley stated:
"When all the facts arel placed in their proper perspective, when we truly
come to understand the full consequences of abusing the natural systems on
which life depends, then it will be generally accepted that man cannot conduct
his economic activities, in an ecological void except at tremendous ultimate
cost. If we care aboutithe economic well being of the next generation then
we must care more than we have in the past about the quality of the physical
and biological world' they will inherit. "
..JOHN SPELLMAN I�1':gr Ale ` FRANK LOCKARD
Governor :lit
P�a"y Director
STATE OF WASHINGTON
DEPARTMENT OF GAME
600 North Capitol Way,C1-11 o Olympia, Washington 98504 • (206)753-5700
•
STUDIES ACROSS THE NATION DEMONSTRATE WETLAND VALUES •
Water Quantity and Quality
In the Devil 's Lake Basin of North Dakota, preliminary findings indicate
that wetlands• can retain 50-79'percent of total runoff from most storms.
Studies have shown 60-90 percent removal of suspended sediments in waters
that flow through wetlands. Flow rates are decreased and vegetation promotes
fallout of suspended particles. Removal of organic sediments reduces turbi-
dity and biological oxygen demand, thereby improving water quality. Saltwater
in estuaries further enhances sediment removal by flocculation of clay parti- •
cl•es. This sediment-settling function helps reduce siltation problems in re-
servoirs, rivers and harbors.
In a number of studies, filtration of wastewater or polluted discharges through
wetlands has resulted in significantly reduced biological oxygen demand (BOD) ,
from as much as 49. 3 to 5.3 milliliters per liter.
•
A study of Mountain Creek in Georgia revealed that the waterway was polluted
with human sewage and chicken offal . After traveling 2.75 miles through the
Alcovy River Swamp, the water was designated as clean by the Water Quality
Control Board. After seven miles, the water was termed excellent. In 1970,
the value of the 2,300 acre Alcovy River Swamp for water pollution control
was estimated at $1 million per year.
A study of Wisconsin watersheds concluded that flood flows are 80 percent lower
and sediment yields are 90 percent lower in basins consisting of 40 percent
• lake and wetland areas than in basins with no lakes or wetlands.
•
•
• .. 3
Page 2
' STUDIES ACROSS THE NATION DEMONSTRATE WETLAND USED
WATER QUANTITY AND QUALITY
A highly publicized report of wetlands storage in northern Minnesota and North
Dakota in the Red River, basin showed that wetlands significantly reduce flood ,
levels in major metropolitan areas downstream. The study analyzed the value
of protected wetlands in the Thief Lake Wildlife Management Area and the Agassiz
National Wildlife Refuge, and demonstrated that during the flood of 1979 , these
wetlands reduced flood peaks in Crookston, Minnesota, and Grand Forks, North
Dakota, by 1 .5 and 0.5 feet, respectively.
The U. S. Army Corps of Engineers determined, in 1971 , that the protection
afforded by 8,422 acres of wetlands in the Charles River basin in Massachusetts
prevented flood damages of about $3.2 million annually. Each acre of wetland
maintained was estimated worth $2,002 per year for flood damage prevention and
reduction alone.
Groundwater recharge
The Cedarburg Bog in southeastern Wisconsin is of great importance in supplying
water to a growing suburban area outside Milwaukee. The 5 square mile wetland
controls groundwater supply for an approximately 165 square mile area. Increas-
ing runoff associated with urbanization will affect the quality of the region's
groundwater. In addition., new development within or adjacent to the bog, which
causes increased withdrawal of groundwater but decreases the area available for
recharge, eventually will result in a decline of groundwater and surface levels
affecting the entire 165- square mile region.
Many groundwater aquifers in Massachusetts are fed by wetland recharge. In
attempting to quantify the value of Massachusetts' wetlands for water supply,
it has been estimated that the water supply function of wetlands is equal to
the difference between the cost of wetland-fed wells and the cost of providing
water from the next best source. In Massachusetts ' Charles River Basin, the
alternative to using well water is purchasing water from the Metropolitan Dis-
trict Commission, a regional agency that maintains reservoirs and sells the water
to municipalities. Comparing estimates of obtaining well water that could be
Page 3
STUDIES ACROSS THE NATION DEMONSTRATE WETLAND USED
WATER QUANTITY AND QUALITY
supplied by one acre ofi wetland recharge and the cost of water from the
Metropolitan District Commission, -the resulting savings from well water
use is about $16.50 per day, or $6,044 per year. The 1981 value of one
acre of wetland forrgrdundwater recharge was $100,730.
Fish. and Wildlife
Wetlands are important 'habitats for many of the nation's fish and wildlife.
For these many specifies; wetlands serve as critical habitat in at least one
season of the year Or during the animals' life cycle. In essence, wetlands
provide and sustain wildlife populations and their attendant economic and
recreational benefits to both consumptive and nonconsumptive users.
Of 276 threatened wild endangered species listed in 1980, 80 species were highly
dependent on wetlands for survival .
In Colorado, 90 percent of the State's 800 species of fish and wildlife depend
on riparian habitat: In Arizona and New Mexico, 40 percent of these States'
wildlife depend on these habitats.
Over an annual cycle, waterfowl -- particularly migratory populations -- utilize
a diverse and widely distributed series of wetlands. At any phase in the annual
cycle, and especially 'during the reproductive season, waterfowl may require a
diverse group of closely associated wetlands.
In 1975, 8.3 million Americans hunted migratory waterfowl , and spent $949 million
for this wetland-dependent activity.
Of .2,100 native fish species in the United States , 400 are important to commer-
cial and sport fisheries ; most of the other 1 ,700 are associated with harvest
species as either prey, predators or competitors. Nearly all species depend on
the estuarine zone for survival .
Page 4
STUDIES ACROSS THE NATION DEMONSTRATE WETLAND USED
WATER QUANTITY AND QUALITY
Nationwide, in 1979, the commercial marine fishing harvest (including foreign
catches) was 9.9 Million pounds of seafood, with a total retail value of
$7.8 billion -- a major part of this catch was dependent on estuaries for at
least part of their life cycle.
Pp
In Alaska, 25 percent of the 1978 work force was employed in the salmon fishing
industry. Sport fishing for salmon also contributes millions of dollars to the
local economy. Salmon require pristine streams and wetlands for spawning and
survival of young.
In 1975, 53. 9 million Americans ,participated in more than 2.3 billion days of
fishing, or an average of 24.5 days per angler. They spent $15.2 billion for
fishing activities for an average expenditure of $282 per angler ($11 .50 per
fishing-day) . Wetlands also support a wide variety of other recreational
activities, including bird watching, photography and nature study.
Wetland Losses
Unfortunately, many wetlands are subject to Intense pressure from natural and
man-made losses. It has been estimated that 30-40 percent of the nation 's
Wetlands have been lost. In 1954, the U. S. Fish and Wildlife Service (FWS)
estimated that 74.4 million acres of wetlands in the contiguous 48 United
States remained from an original wetland acreage (estimated by the Soil Conser-
vation Service) of 127 million acres. Precise figures on the present extent of
the nation's wetlands are not available because no thorough national inventory
has evern been conducted. Nevertheless, best estimates indicate that
300,000-400,000 acres (470-625 square miles) in the United States are lost
each year.
California has less than 0.45 million acres (13 percent) of its original 3. 5
million acres of wetlands left. By the year 2000, Connecticut will have only
14 percent of its marshes present in 1914.
1111..11...“111
.. ...
. . ,
. . , • .
Cattail - Buttercup - Rush
. , .4. •
.. .. ..
..- •is %. ...• „
. .., .. ,
. e - • - . •
. .
' a
.*'* '*.•'0 ..
'If I.,•
•.
•
A • ,- ., ,,-, ,...„•••• . . •••(,•; J'• . ,,!
,• 40 71.*4 - 'lf ,,...,-, . e'•
, 4 ..r4 • ,
- 4, • ,.
41:'
• 14 I, 4,,, •4,
. , . -. •.: , r • %
• .41.:4 ',, I.• i ,4, ,. , •
0 • , „.4 . , .
•, i , , -• ,r, .,,,' ' .,. ' '-• I. 4 j4) . .• . ik ,,-1,,,,,,
,, ...,..., ,‘ .4. , ';..,t, 0, .,.,,,;,,,.,,,,,,i ,,,,' . ,, ,,,, .,',.4..,,,t.t.ii,.,i,gtit...' ,,,, 7.I'''t ';,••,,f. •$%,'": ". ''''
i
..!.',k7Y3 ' yticirfficlyedWti 1 Ittfor• ,t ,Iii fl,,,,A.1,,,,f: ,,,ivc,11.,.10;. ,,, . . ,
i
,,,,,,,,,,,, .... ,,,,,, ,t,,„,,, i :-,:....(,,..,,,,,,„,,,,...,, •14*4,,kt''Zi'l .M. I IS'. i:41 "', • „'' ' .,
MAjb,k, ...Nrk:1144 .\',s, k...1.::•2i,„i„it' .; ..P1.,' - ..q.',.',‘'•,"'1' •',/ ,,I $1%1',: ',.-,•:ti 44,10','''' '':: • '
--1,4A:'....:•,.'N• %.1.?„4.•• .... '• '• %,l'i •,•,;,,, ... , ,,,,- • „••, ..1... . ' . ,: O.;,ti., - ,. , •4.;••••-••,..•' , ,5,',.:•,.." '-- ' ', • - .1‘4r),q ' . . 1.•• ..'.' • . .. '1'
,I., , '', • •(..; -• •" ‘' t'.' -- .1..•st.i!..•'..''d.' ' -•,•;•••'t;-,..:l':•.••.44';,.;-. -''4..'• .• r'' •. '. .. r 2
olt..,",‘i'•"ic.k:41, ":',i.7.• '... :"4:..,.'" , '. ,
..'-•': '-„"- '..- a. . '= , ,'' - .i 1. ,-0 - - ,:s.-::-..s.-, '".• -'.. % 4
r "..•tv,.:if. r: ....:11f;„i ..,I.,•;,?:',Z.,....1,:pv:1......ty;.:',".':,...1,4(',,,,....;.,1-,„,-.,,:. ,. ',.•s,, ,,, l„,.,,'•
''' .i,'„...—.,•.:,..., .,ii,, •*,,,,L..*:1,,,,.‘•,i::, •.s.14,i'4a•k,.., ...„...:,.,,„...,„...,..„,.,,..,,,,,,,,,,...,...,..„.,.„...........:, ..........
,,,,i. .:-.."474,.%:.,..„ '',.. i., '.4t:k."-.,44,-,t';4:-•-4 ..,.‘k.V.:.Vt..-"r 6''')‘;'•
. 41•‘••• ---)•:14.•.:,..'•-.• - ',..-. --.,:. .,r•, • IN. ::,,...—;
.,-•';.,..,.-;),Ivif„...:,4,,r-,,,,„:1,.'•17.0„,;,0'..;., :;, .-.4;..`,3,..fc,N'....PA.,...F.,,. ,i. '&;•„:,....-41.. .7. ei• , - ••_, -,,-..•••
, :.•.....:.;..;,....L„...., .•,;,-- ,ii., .:,..• ,, ...„,,,,::..••• ....,,, ...-,.....itA,.. pirf. , rr,.„,, (.--•,.•;.•.,r„.,..• •„;..... ..., ik...,,,, .•
!,- ; ,..•,',700..r.'„?.,1 ...•••••,, ,,v,„ -'. ••:;! ''.; ,%,,,-V.skt 11. ft ‘ 1• "'‘,;1'''tt`....1)1V4 .•' '1: ..'"f i':-,-:•' '
•‘'..:-Ali-',. ,.,.,,k, '' 4 ' • •P.• (.4-•••,7....., -)..,'' .. AIM'..••;,*I "1141;,%,\NA ,.`f:';;, ", b,•./ ,, '\, ,, 1,-1'tn..'i.
Cattail requires ponded water for part of the year. Buttercup and
rushes are found in both marsh and wet meadow environments. This
diverse wetland habitat is found near and on the site of Issaquah's
proposed Town and Country Square.
• •y•o'. -- - • .
• • %.•%, •••,•-• •1. ,, •
. , ,••• .- - . % - i ' , ti: Y., ee•-,•..„. -;„ —
. - , , '4 ^,,,.. • ,::,' i .4, .4.,Or -441s•- '
' . ''k, ,4 '•S‘'44 4 4'; ".Koe" -
' ' ). : 'AV,. „'.=y • .„'r.‘, ' ' •- 1- "^ 9 as ,
-I
, „1 1 •,..'4,`A 4 ..••4,' ' . ,,, „• , I, 4: tr,"440?l'i4: '.?'..• e ,
' "!tli ":.t;. ",41b, ::1,f!.;itt• , .• - : ,t :t 'A i , t ,tig""r 4,4:k't ,...t ' ,, t,t.: ,
. ,,•, ,• 0. , ' . 4(4 i j'„IL ,.': „, , '::., r It ..%
. . •, .4 74'", 1 p. ' , .'. ,-•,, • '-- „, ,,,:•1',.-.'.', 1. .-4' ,- !.
II 4.,.,„t . '$ I, :".• '.. . I: v.. . . .. -, ve.-4, ,,,,i .• , .. . I.,t,
• " ," , , i• - 1
\ .` 4; r,"•. • ,;':' , AG! : . "..1•° '
, ... k ,,, ,,,, .,/, •:, ,,,,,, ' ` :vt.4, 34,0::_ '• .t.' , ' f „ f ; ,,,,. / .'1; ; '•
I i
el A:1 cr.:;:,,';';' F'Li!•!, „.1:,-._.. - ..
/ g. 14,/ ' 1 : ''. . '' / '. •r
i / `I ii ' i,r-„. „•- i
' %, .i ,,-_•: ,A! .,40.4/ , • , L • 45..P" • • I It
.4,,i' •.1411 .4\,44 .4 i . 1.i..:•i. t '4 - 1 it ( I /
ito
,',t •
.14...r., /4‘ :.• 44-4.. •• 0 r ,,../ . I. /h.
4,
., J4 00, A., i •, ,N.1 0 0•44, •'''1 . 4 1 •
,..._, t - ,44;• i, .„ , , V
.7 ' `. If., r I s ' ,i • • (C. /r .• ' .:
..v.• i.f.'4) \f. ii I., .‘„irs , • ,i,eL ` , 1 i ' 1.4• ''./A
, , .., 4 •. • ‘ I' I ,,,iiir.,i) i .td fr e 0 L.4 i . ;o. .-4.
''kiT 1- '- ' i ' ')-; • 1 i "$f, A4' 46- 'N Ai i, ./i rzt ,, .,k :
;Siv, 4 ' r. :.
,104,
t
'.; • I ' ‘0 • ; . '11 ' I - A ' I e 4,' • / .1 al.
4. ' '-. . ',,,,..t,„„ • ; ki, ,,,,,
• , 0 t,, r. • . .
• , . ir, ,.,
.. ... . • 1 tiii ?,• 4\ • !' ' , • I • 'A)
I'I, a;4P (ii' .'•41 ,41 ^." -' -Ph-
. A..1. r
s ,.,. ,
, mi ., •• ..,....
. • • .
Close up of Rush, Juncus sp. This is one of the most common wet-
land indicators.
. .
r ' :-....---0-;'• I(g ',t 4 4',..t.7.14 tt i l'''i ' •I'' . !..'.',, ••.L._-,'i I ''.. • 4 ',. t d>.`
i , i , !
•• t ,, s � �� � ! w+ is � ,,t `.. "
1 � . •%., ' "g' '7:1'''P t''':'/' •'''' ` '..4'P''• •:';.: 't)SA?•ti/:' '...*,04:. r. !.-7.^.. .".',;'',!,'• ...-'' ', ' 1 - • r
• --1.- -,:. , - • . ,- lir e
:...t ‘ ,,..4„,,„,,I. -,,,s „..,. .,..11, 1.8,„,.••• . • ,
ff; ,,
%
'pi �S•y of it,,, �•;Y'�' c '• , '//-NI! , u.:if 1 4I' 4
I
Skunk Cabbage - This plant requires saturated soils and is an indi-
cator of a wooded swamp. This photo was taken on Tiger Mountain in
Issaquah. .
-; 4.K ,t s..4...,,Ni t ,1c�� "Jl'4ta n Yi. Ika ' a t 1 1$ '!a"
ytt. y 4 .f.{ 1 1lt' a� y0 ,•,twf -., , !, m -.J qb J y� Y 1t:1
J y . i;i t r�'• 't ,,;a - Q4. , I'rtfi ,..I .
- ] t* .� t•Y .• , c v. .•--�•r,^ •,�.�Sg q J+J'' 4J 1, ,•c';;;.1t.. zt K�a
cT•,.. a1tn`!';4?l v• ,• , . i '44TF 4�y •/n. t ‹....4:- C! nCTt `
r, r a r 1 .1 %I rL�¢ �,} I , ` .ti Z. ° '''� ,u`6.: (,:,3•
" �J Ii<C �'•�I'•3. • r , 4 \, } , ' }s,�'. 1', r ry� •,lb.Ma'' {F•,�i�(�.t �11��,+,�
ji'y-✓.c iFi�!�Kc, •till-13`iFw,Y" `` .. 1 i• A:41,, , .4 •g;'e • V-
q,,.....,,,,;.,„,„4..,„k ` 4 S y •x t
_ —
•
i l'''),'",4114-17 .'"i'•if V ..* 4 , *,,,i,,_ .4,
',, ` 44';'.14,4,•, il
r rf h ,I'•r6.§'� •:(pig s� fu'1 it`.Ay,ty r , 1 ,4
1 t i40..•- s_I,',,V.;:g.,:44-'iv . „tip Ito.'1' '7:'" ''.4 .
`:sly. '
Ste^ 1 t 9 (''. M • ` `aff..
` ,. ' 4. ., .r _ .
•
Hardhack or Spirea - This plant is found in a shrub swamp. It can
serve to restrict pet access into sensitive wildlife areas.
These are only a few of the wetland indicators. However, most Issaquah wetlands
will have either cattail , rush, skunk cabbage, or spirea along with other wetland
plants. •
f
•
•
•
Lt...ANII
r• YYY•• • r+ { •`
•
t .- 1iLz/,t. ' ` y`-.awr1v t4•%. t\}[\� l . - 1, r Z f
\ ' N 1 ...‘ W... " • . ii
4., ,
•
•
-,1 ., .,
•
/y" ,..1. . .rl ., .era t .,, 'I .,.. , , •�` \ '.,, ./ • L
'• y ,,‘. , ili,
III ''-� t , 't -t., .,.
Kt f"Sa `t�1tK1. \;— . . \:r`0" , �y `1i, 9 ;.,A�' , ,61,
i .)r }'►�'� V ii•• a fi f.. r tJ .
Itt
�'I' ,�, �, x• ly.• far, y y 1 t�.Vt�� ! ).
Stream Corridor - Riparian Zone - Important wildlife corridor and
feeding zone. Vegetation keeps stream cool , provides fish food,
prevents erosion and filters storm water. Mouth of Tibbetts Creek,
Issaquah.
„ 1
tr , , • : P I F • • r�•�f'
t•,;.i lT:41t1 .'7,", Y'' f' ,ty its) ' ,+� ,1!•�CH} �' "' i.' t...."'kJ / '''i lir•F• ' � j1 , f IrK '•t: I
r it .I: 1{• li 1, I t, �j,Rtui r 5 .reil
�'1 t� > • • •�
+..
1 {`j i 1l,t'f:,, li ir ill"�,til �' 1ik,1,}r•:-1:J'.,'\.r .1 ..4 1� lI: r 1 ,
1 ' C'-•' /�`111 I I{ 1f��1 •V/ J111 {/�rr1`f` it" ; l .i l S' l 4
•:.! c -t''td'1'z.-, +, .I}4 "'•„.,,i);.t.If'r1� •i j•+',` ,, `, .ilia j �: •
. 1 Y .1 ,. •_i•,1i w,•. r ,( (') - L{. V E ,.mat•: , ,,+..
��t'- '& fr y'L t 1, , ` • S ' N ,, -
4
��1' 0I •r "/,•i ,, Cf•�(� � • r,• I i42. ter' •— ,- ,
(( j-.? a 'L..,.. Wit... . - A.
,, t 1 •1 •J, a Ry., ' , .r h:...' '��^'.'r
Lakeshore Riparian Area - Vegetation along the shoreline in the
water and on the land produces much food for fish and wildlife.
Lake Sammamish at Issaquah.
u
1 1 A i .{ r fi r• .M ,
dif
1 /
l• �' t �/✓ ! ' v r %1. .111E
, i i.,..`' .T:v..',, f 1,'.1,: i . ' r. y%` 11.4 J i*r f Y�� �` T're
/r,/ 1``.I I'r, i •-sue ~r . , aba.t „ *• x •
v.
i' d: . .erg ,�,,h ".•'y. ' , '• $.?• i,
Stream headwaters. These headwaters contain no fish but are
producers of a large amount of fish food that washes down to fish
in lower reaches. Large amounts of stonefly and caddisfly (aquatic
insects) were found under stones in the stream. These insects are
a major portion of trout and salmon diets.
This water flows from springs on Tiger Mountain to Issaquah Creek.
•
• t:
•
No. 11-5 5.1
RECEIPT FOR CERTIFIED Mii4L
NO INSURANCE COVERAGE PROVIDED—,
NOT FOR INTERNATIONAL MAIL -
(See Reverse)
SENT TO MR. DEL BONDS "
ALTERRA CORPORATION A_
STREET AND NO.
P.O. BOX 66101 P.O.,STATE AND ZIP CODE
SEATTLE, WASHINGTON `'�'-31(
POSTAGE • $
CERTIFIED FEE
H SPECIAL DELIVERY
W
Y. •
• w RESTRICTED DELIVERY
• w SHOW TO WHOM AND DATE 111
DELIVERED1+1
Q
Cl)• Ce
H SHOW TO WHOM,DATE,AND
I- a ADDRESS OF DEUVERY
►�- W SHOW TO WHOM AND DATE
o ce z DELIVERED WITH RESTRICTED Q
z �-
SHOW TO WHOM,DATE AND
w ADDRESS OF DELIVERY WITH
m RESTRICTED DELIVERY
CD
TOTAL POSTAGE AND FEES $
POSTMARK OR DATE
JUNE 3, 1982
0
0
rm.
STICK POSTAGE STAMPS TO ARTICLE TO COVER FIRST CLASS POSTAGE,
CERTIFIED MAIL FEE,AND CHARGES FOR ANY SELECTED OPTIONAL SERVICES.(see front)
1. If you want this receipt postmarked,stick the gummed stub on the left portion of the address
side of the article,leaving the receipt attached,and present the article at a post office service
window or hand it to your rural carrier. (no extra charge)
2. If you do not want this receipt postmarked, stick the gummed stub on the left portion of the
_ . address side of the article, date,detach and retain the receipt,and mail the article.
3. If you want a return receipt, write the certified-mail number and your name and address on a
_ return receipt card,Form 3811,and attach it to the front of the article by means of the gummed
ends if space permits.Otherwise,af ix to back of article.Endorse front of article RETURN RECEIPT
REQUESTED adjacent to the number.
-4. If you want delivery restricted to the addressee, or to an authorized agent of the addressee,
endorse RESTRICTED DELIVERY on the front of the article.
1` •.5. Enter fees for the services requested in the ate spaces on the front of this receipt. If
return rece�ptas requested,check the applic in Item 1 of Form 3811.
`6 -:Save,this receipp.and prev,nt it if you make Ili
n .
A GPO 1978 -256-915
®SENDER: Complete items 1,2,and 3.
-n Add your address in the"RETURN TO"space on
reverse.
fig 1. The following service is requested(check one.)
N Show to whom and date delivered
❑ Show to whom,date and address of delivery _4�*
❑ RESTRICTED DELIVERY
Show to whom and date delivered „G
❑ RESTRICTED DELIVERY.
Show to whom,date,and address otdelivery.$_____
(CONSULT POSTMASTER FOR FEES)
2. ARTICLE ADDRESSED TO:
MR. DEL BONDS
ALTERRA CORPORATION
P.O. BOX 66101
SEATTLE, WASHINGTON 98166
mo 3. ARTICLE DESCRIPTION:
REGISTERED T!O. CERTIFIED NO. INSURED NC'
� 115515
6?' •
(Always cbtain signature of addressee or agent)
65
I hay received th '-tide describe above.
IGN RE ❑ dressee ❑A orized agent
,v2 4.
DATE O5 DELIVERY TM $S
m .$ d
4)),
5. AE DR£3S(Compiets only if requeste
A.
RI 6. UNABLE TO DELIVER BECAUSE: •sy ..
' GPO:1979-3..-.53
UNITED STATES POSTAL SERVICE.
OFFICIAL BUSINESS
PENALTY FOR PRIVATE '.
SENDER INSTRUCTIONS USE TO AVOID PAYMENT {
Print your name,address,and ZIP Code in the space below. OF POSTAGE,$300 _IlI___�
U.$.NIAIL
• Complete items 1,2,and 3 on the reverse. INZINIIMI.
• Attach to front of article if space permits,
otherwise affix to back of article.
• Endorse article"Return Receipt Requested"
adjacent to number.
RETURN
TO
CITY OF RENTON, BUILDING & ZONING DEPARTMENT
(Name of Sender)
200 MILL AVENUE SOUTH
(Sheet or P.O.Box)
RENTON, WAS HTNGTON 98055
(City,State,and ZIP Code)
OF. R�
w z` - ' BUILDING & ZONING DEPARTMENT
Z 1� • o
RONALD G. NELSON.- DIRECTOR
0 0 �� MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH. 98055 • 235-2540
AD
14.D sEPIel#
May 28, 1982
BARBARA Y. SHINPOCH
MAYOR •
Mr. Del Bonds CERTIFIED MAIL
Alterra Corporation #115515
P.O. Box 66101 RETURN RECEIPT REQUESTED
Seattle, WA 98166
SUBJECT: BLACK RIVER OFFICE PARK/FILE R-129-80
Dear Mr. Bonds:
The Environmental Review Committee has reviewed the comments obtained from the
above referenced Final Environmental Impact Statement. Based upon this report, the
Committee imposes the f ollowingi conditions necessary to mitigate the adverse impacts
of the proposal:
1. Prior to second reading of any ordinance rezoning the subject property, the
property owner shall (see Exhibit "A" attached):
a. Dedicate in perpetuity for storm drainage purposes that area identified in
the SCS P-1 project as the forebay pending area, and;
b. Dedicate in perpetuity for wildlife and natural vegetation mitigation
purposes that 3.5+ acre area illustrated for dedication to the City of
Renton;
c. Preserve in perpetuity by restrictive covenant running with the land for
additional wildlife and natural vegetation mitigation an area of 8.5 +
acres parallel to and contiguous with the dedication specified in
paragraph 1-b above.
2. Any development of the subject property shall maintain the current one hundred
(100) year flood storage volume to a water surface elevation of 17.1 feet MSL
(equivalent to future conditions, with 400 cfs maximum discharge - Table 1,
page 6, Appendix D, FEIS).
3. Any future development of the subject property shall be subject to further
specific environmental review with total building floor area and type established
upon the following criteria:
A. . -
`MR. DEL BONDS
BLACK RIVER OFFICE PARK/FILE R-129-80
MAY 28, 1982
PAGE TWO
•
a. Adequacy of transportation access. Any intersection impacted by the
proposed development if above LOS-C shall not.fall below LOS-C. If this
happens the developer.shall make such improvement to return to LOS-C.
Any intersection below LOS-C prior to development shall be maintained
at its present LOS Iby improvements by the developer. If the intersection
is presently below 1.0 V/C the developer shall make any improvements to
insure the existing V/C ratio.
b. Adequacy of fire j response. The applicant shall demonstrate how a
satisfactory response time can be established for fire apparatus.
c. Adequacy of water and sewer utilities. Water and sewer systems shall
be established at such size capacity, and location to meet the
requirements of. the buildable area established by 3a and 3b above and
the Utilities Comprehensive Plan.
4. The cost of any capital improvements required to implement paragraph 3 above
shall be the sole initial responsibility of the developer. Any late comer
provisions provided by local ordinance shall apply.
Very truly yours,
7024,P7/L j
onald G. Nelson D emens
Building & Zoning Director Policy Development Director
ichard C. Houghton
Public Works Director
cc: Mr. Joel Haggard
•
i
lil.;J..,..;....•"..7 r•: '-i 1 I , 1 •-\•,-- '.
• .
-•- . . A.- / , - ,.. , r* ilii , .. /,....--- %,...._' _.., .. , ,s ,-..,
il•:-•••,,T• 1 . • '
rx
.,.. . , ,
, •(I, :',.;;.,--,%•,, .'., ''.:` •
'I r,i)J'I • •:0?,:i, : . \ „.:,. __ , , )1117 . i // .,,.- ----,..,.--1-' -- -.- -"- - \''' ...;,%-:',...., --. '..---• -;•1., •-,/,,/ ,.
es . . .! ..4',N k \ '•X,'' \o...R'\ - '*'^.. \•;...;4•> . % to
.1-. - 1 o.o I • ••-...__/,j,r 1 ( i...:.,- , .... , ,,. e , .., - ._ ___ _......;;.......- ..,.. .,
... \ .
. ill '\ \‘' \ \\ .- • ._- _-_____---,
ir k°', ', ,„.\ •
I. • ' • 1 \' ' . ,
. 1 \ \\\ \ ''‘i '. %• -- -----
.,, .. . -..‘ ' •,..4 4... /.\ li'i , ',X \ \ .N • '--,,,_ '..ov ',0•
,- ii• ' •.1•\ . - -s .... . -,• '.
•).:.1.1 ' • , • - \ \\\\ \
, • ,
••• 1 •• \ .. \\\..N, , \ \.-,----.--:-.. :- -7-.---_-.7-7-_,-,t•---....,,-,. ,
/ . :' 's/ ,((.7.,..2 • \‘‘ \„
I ,-,')N \ \ ':', \\ "- / •.,
•
1,11.••,.o., " ' . . ../ 1 \\k.2.•••• , -,\ s,.‘s ,s\ \ -..
\ • //
,
. 4 4;,,/ ' • „ :
I \ '' \ '• -' N \\e.. •
' .- /,'
\\ 1 V • \.. N. / ,
. :.-4, N'rt -:.. • N „ . , %., \ '.--.‘ •
n 14.4/::,••:.., • --......
• no •'
1 • 1 1 1 \ 1 JII ' '. ‘1N.‘
...„-:.
........
I • • i --) .....,.., \ ,
, -,,..:-.:.:.... . . .--.
----..... ,..
\ - : ,,,.. . , : , ,
k -..._-",-,-.,c ., •\\ \ \'N i ••/%-.'
...i,.. . -...---„z--...- • \\\.v,\
.. „.
1 , •.}:4;•1..1 :1•::,...':.:::-... .. •,
. N -- - .'-• :,,,..,
.--- -----.--;;-,--,...
•-----•z-- s\\\\\
•\•.,‘ \
N-:......- - \\\N;•,-,-.
, -..,-,-,f, --••__-•:\\\\N.._..--- ,..-,,,,,
•
•
ACC.
, - _ •,,,
•
I i t". 1,:'.; '. • -.N \.,,
,, . itl:•,f."': '' • ,\ / NN . t ) \ \ \..y.',4 ° •
-•'-*-fc::':•'..,•,.•:•• '. - \ N • i 1 ••••-____.,
;;',VM..,-..,''• , • ... N. "- \\ ; I f /1 '
-\
'Of','Ii', •... ,• , . ---....„
-• -.,,, ... • \ \ i
, ..4. .. •
Y,•-..11P1',.. ^!. ' 7/
•-•\N \
/ / N \
1-1'1:i;::-. ,;•''.... :.
/ \ \
\ \
-.. N -----•
,. , \ . • • a
• , ,I,..,,ii:.• ..... ..
\\ \\ \
•IK,Vi :•!1...,•••:.: ' .
1 s. • ,
I•V•iI...,,•• .:-.:.:- .. :
'w, si..4..
1 / 1 \\\\\\
„,,,.1., ,i,,•••;‘ '.' , ' / , I
,r 0,:,r:' ,"-- , • , ' // / \ \\ \ •
?.x.,:. , . • .. .........""‹ • ;;;,P.' - --2-._ . F ,/ . I
• . ...
I ,
/... .— , .
1 //. \\
..‹-- .,-''. .
. ' N •
t . \ , / .
,
, , -. . I /1 \ • \\, 0
,•24.,;_:,-..--- .1c.„,...--. I_ _ .
-.4,•,,,;;,•.: , 1
• t• .„ .:. . , ,. \ , _ / ,c, ., \ ,.-•,,\.\\ \1\
I. Tt'... N \ / • / / \ \* ,,, '..\\\\\‘ \\.\1..._
...............4r7...°
• 4............. .••••••'.• ,i1
N
N ••.
N .
t \ \ •f - A\A•
'•\.\\\ \\\
\,\\\\ w. . •
• t qm 101 : .
\
'"'' / I 1 \ \ \.‘• .\..\ - ' '
.‘. . \ e / • ,. /
I '%, . / 1 , , •.,4.,\\ \\
1/, ,
. . . A
• . . , ,.: , , ,
!,_
. . •\•\\ ,,
L. . . •, L...,.._. 1 .,•\, ,,,, ,,\,N,
1.. o i "
// •o .i: nn." .."'- I ... I (..-----"1 .`
. -.. 7
' 3. . • __., v
•. , .. .,
'... ' • I ,i / , if
... .
r.• r ' • / : Ii ," / • .
. ., \:'\\.' ' •
' ‘.1 11 \•\.„,
_.
t ----:----:---. ------ ii .-
..,7,.. A .4-..".. \ ,
, / •• • - " i, . .,.
/ \:_• -) 1 \ li\ \•\1
• / •
/ , ,\
.• ,- .I.J I' ".. 1 , t_. ' • 't , •
: If 1.,. 1 • ,.. •
, \,, :—?,----, - + //
,
1 , ,
,.. . ,, 0 ,
-
,.. . . ...„..........,....-) ,._ , .
•-,, • ,, , r
\;;_
r ..
• *
. . ,
••••• . -••-.- ':1„.,
-..
; '''
....,..
L
1 .• •; - i -.. /
,V, -----• / /
i • ' '. •:..,k
/ . / 1 •
IV - • I i ' \
• ;it• •
\
\ - -,
/
\ 1\ \
.) \ /// / .!
7 ..
4.•`1'..;.••' ---
li ;• 'd " ' ..-------. -- —
\1 \
• '. :/.. ' " '\ 1, .• .
•
//// • •
:.' • •• .....' \ . • ../
• ,f'- ---•
,. ,
.- •
• oo .• • \ •\ Nz,/ • 7/ .. / ..../.1 1 11 \\\N•!N' / / //
'' ` , ,
rd" ' . / 1, 1 s.s.
\ si \ / \-:\ \ ''.:. / // •
r.11 . ' .i
1 ... i ' I • \ , i I / /‘‘e .
• , I \" 1 1
. I/ /c/1/////
/ / // •
\ . v. 1.-/. . / i 1 / I' / / / I .
. A; ,... . • 1
V / ''s1 1 1 1 . •
.1
7 1 ' I
\!
i--.A , , i ' I
,, 1 1 6, ,
,. 1 . \ f_._),
/ i \ \ i
; , . /i, /
. . , 1 ,.. , I I 4
\ , 1 !0/
1* • 1, i
, sV.:. ../.....-i• \ \ , \ • f ./ .
-.::.> \ \ . \',I by../
‘ V - i 'I`•
i ' N \\\ ' ,o..1 I!1..4.,•••
11 I
\. . 1 . , \ \
I -.... \
\\\ \t4. i
1 4- .,
. 1 \\
/ \
•
,,•:..\,* \.%\
\
. . \ \ • \
. .
s \ ,
\ ' 1 ; \
i s 0\
. •\k‘\\\\I‘ • -•' / \
, %.•\'4'\\\t. '
\ ..
1 , . ,..\%
, N \\.k
1 t' ' / , -,
\ •z._,. \\\ .
: \\ E•\ \\ , .
••• . ,., ..\ .\.‘ •
i' -1. /'• " . ''' '\ 7.5, '`•\
, ••,. \‘ \, N. •
'., --.. „/
, ..
. aji li •
, \ ,•\
. \ ''• ' . '',......,..,„
N INV' 1.
• 1"..z.- ,
' \k .•
• - ! .\ \ A \ \s '
* 1 ..-..... -.
' Pr ••••. \\\\\ \\\
-----• \s '
I.. . o .•\ \ -. ,
i i ' \\. • .,,\ . N. •-1
\ sl\\ •' n . 1- •,.. 4,• -\ •
\ ' ••-•
\\ \ NV - o i
' \S.'•.,.--\
1 , , 1 IL % •1.*: \ \ \ \‘\\ • .::: '. \ ' :::` \'''
I, \\ ,.,\ ..,„. - 1
---- •
—_......, ..
/ N. , ‘,.
1'.1 .• ' • ` . • -, \ N-\k‘N'N.• . •
- •
..>". ‘. .• .7--"— 1 1 ..
1 \
,
\ "4. 1 ' •
—
\•\ -,........,_4.\\ \\...,
,,, , /
/ /
/ ......./) ) .. ,,,;;•.\ N. \
..
, \ ,
•,. , \ 'A7\\ .% i /' —A . '• \
\ \ • -. __
i' •?\)1.1,
/ / I ----—.—
\ v.., \....
\ &
\y. !
. ,
....14ialmogass.
,/ a. \ \ ,•,\\‘,
. ----loitS11 •.4 V •\ 1
\ '...'•:\
\ s ,\ , \ \\ ' I i - • • , • 14,
„
...1 -. ' •• •\\%\\\\..,
/ •\ ',\ . c
, -..-,
\\' ''- \\ \''' '' ' 1
- ''. .. s , /
\ •\ %",ir .007, -• • — —-
' • ' -6 ...
'' I. ' '' ' ...T:' zi'• , \--N\I ,.. s ... . •'s"-.1...11 \\\\\\I
:I i. \ \S\.4\ .:'\•"..-. ‘7\\-,''''-411raler \\,\, ' //— ----- -, .
• I t„
• .., • • t -.. . .•-• '
/T.'," ------j )1\1\d'•
°... - _---- .1\\•,.
- . \
C ill'•,1;.':•'. ‘
,''' -,\'•\'•
-„ ' , \3:, Vs:,-, .\1\
, .-.:. •t•,i :••.! ,.
\
, ,. . .
, __..._
, e -- • . •
.
/I 1,:.7-1-----7-_;__:.77---%•
..•• •
—, Jill/
{
HAGGARD, TOUSLEY & BRAIN
ATTORNEYS AND COUNSELORS AT LAW
RUSSELL F.TOUSLEY 1700 DAON BUILDING
JOEL E.HAGGARD 720 OLIVE WAY
CHRISTOPHER I.BRAIN SEATTLE,WASHINGTON 98101 TELECOPIER
WILLIAM N. SNELL (206)624-5299 (206)624-6959
WILLIAM H. BLOCK
MICHAEL G. FULBRIGHT
KIM D.STEPHENS
OUR FILE NO:
May 25, 1982
N-15004
Mr . Roger Blaylock
City of Renton
Building and Zoning Dept .
200 Mill Avenue South
Renton, Washington 98055
Dear Roger :
The applicant incorporates the following
conditions into its rezone proposal and agrees that the
following may be made conditions on the requested zoning
classification, subject to the qualification below.
1. Areas to be developed shall be limited to
those areas identified on the site plan delivered to the
City on May 21, 1982 (Exhibit in the record of the
hearing) .
2 . The maximum gross square footage of building
to be allowed on the property is 995,781 .5 square feet .
3 . The about 9. 14 acre acre designated on the
site plan (Exhibit ) as "Soil Conservation Service"
shall be given as a charitable donation to the City of
Renton or King County for use solely for the P-1 Channel
and associated facilities.
4. The about 3 .91 acres areas designated on the
site plan (Exhibit ) as "City of Renton" and the about
6 . 61 acre area designated on the site plan (Exhibit )
as "Preserve" shall not have any buildings constructed
within their boundaries.
NOTE: The site plan designated Exhibit is
intended to identify approximate boundaries between areas
of the site and are not actual boundaries.
5 . Storm water collected on the site shall be
handled in accord with applicable City code requirements,
provided that there shall be no detention requirement for
storm water . CITY OF RENTON
MAY 2 51982
BUILDING/ZONING DEPT.
• a •
Mr . Roger Blaylock
May 25, 1982
Page 2
6 . All structures constructed on the subject
property shall be flood-proofed ( if required) in accord
with RCC 4-736 .
7. The storm water transmissions system shall be
placed underground.
8. The Major Roadway (32 feet from curb to curb)
as designated on the site plan (Exhibit ) shall be
located within an 80 foot right of way, the general
location of which is shown on Exhibit . The actual
location of such Major Roadway may vary and be relocated
when building permits are sought . The major roadway will
be constructed to City standards for , and dedicated to the
City as, public roads . Should the entire Major Roadway
not be constructed at one time, temporary turn arounds to
assure fire access shall be provided.
9 . Water utilities are to be installed per City
plans and shall provide for adequate fire flow and
hydrants.
10 . All utilities shall be underground where
feasible and reasonable and shall be installed at owners
expense per approved City plans.
11 . No added open space beyond that shown on the
site plan (Exhibit ) shall be required except that
associated with parking lot interior landscaping as
required by City code, insofar as the areas designated as
"Soil Conservation Service, " "City of Renton" and
"Preserve" are to be kept in open space.
12 . Crime prevention measures based upon
consultation with the City' s Police Department will be
incorporated as reasonable in development design.
13 . Internal ( i .e. , non major ) roads shall
adequately provide for Fire Department emergency
response.
•
14. Prior to the issuance of any building permit
for any building on the property, a building specific
traffic analysis shall be done. Traffic resulting from
the building shall not directly and solely cause a LOS
equal to or worse than E at the intersections of I Y 2 cI EM
.... II W :0
MAY 5Ito/
BUILDING/ZONING DEPT.
Mr . Roger Blaylock
May 25, 1982
Page 3
and Grady, Grady and Rainier and Interurban and West
Valley Highway. If such LOS level directly occurs due to
development traffic from subject property, off-site
improvements or on-site changes in development may be
necessitated.
The above conditions are considered as a package
and are offered without prejudice to any rights applicant
may have under applicable law or may have under Secton 5
of Engrossed Senate Bill #4972 (effective July 1, 1982 ) .
Sincerely yours,
HAGGARD, OUSLE & BRAIN
el Haggar
JEH/ag
4862B
Enclosures
cc: Mr . Del Bonds
Mr . Ron Neubauer
Mr . Mike Hunsinger
CITY OF RENTON
NNI D
MAY 2 5 fy82
Kt:LDING/ZONING DEPT.
j. •
-
.�F_ R�
J' ,1I�
44.
�y © °� . BUILDING & ZONING DEPARTMENT
• o
mu. RONALD G. NELSON - DIRECTOR
Op11110=11 �� MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH.98055 • 235-2540
AO9�TFC SEP*1Ee
May 28, 1982
BARBARA Y. SHINPOCH
MAYOR .
Mr. Del Bonds CERTIFIED MAIL
Alterra Corporation #115515
P.O. Box 66101 RETURN RECEIPT REQUESTED
Seattle, WA 98166
SUBJECT: BLACK RIVER OFFICE PARK/FILE R-129-80
Dear Mr. Bonds:
The Environmental Review Committee has reviewed the comments obtained from the
above referenced Final Environmental Impact Statement. Based upon this report, the
Committee imposes the following conditions necessary to mitigate the adverse impacts
of the proposal:
1. Prior to second reading of any ordinance rezoning the subject property, the
property owner shall (see Exhibit "A" attached):
a. Dedicate in perpetuity for storm drainage purposes that area identified in
the SCS P-1 project as the forebay pending area, and;
b. Dedicate in perpetuity for wildlife and natural vegetation mitigation
purposes that 3.5+ acre area illustrated for dedication to the City of
Renton;
c. Preserve in perpetuity by restrictive covenant running with the land for
additional wildlife and natural vegetation mitigation an area ,of 8.5 +
acres parallel to and contiguous with the dedication specified in
paragraph 1-b above.
2. Any development of the subject property shall maintain the current one hundred
(100) year flood storage volume to a water surface elevation of 17.1 feet MSL
(equivalent to future conditions, with 400 cfs maximum discharge - Table 1,
page 6, Appendix D, FEIS).
3. Any future development of the subject property shall be subject to further
specific environmental review with total building-floor area and type established
upon the following criteria:
➢ .
d MR. DEL BONDS fi
BLACK RIVER OFFICE 1-'IitK/FILE R-129-80
MAY 28, 1982
PAGE TWO
•
a. - Adequacy of transportation access. Any intersection impacted by the I
proposed development if above LOS-C shall not.fall below LOS-C. If this''
happens the developer.shall make such improvement to return to LOS-C.
Any intersection below'LOS-C prior to development shall be maintained
at its present LOS by improvements by the developer. If the intersection
is presently below 1.0 V/C the developer shall make any improvements to
insure the existing V/C ratio.
b. Adequacy of fire response. The applicant shall demonstrate how a
satisfactory response time can be established for fire apparatus.
c. Adequacy of water and sewer utilities. Water and sewer systems shall
be established at such size capacity, and location to meet the
requirements of. the buildable area established by 3a and 3b above and
r
the Utilities Comprehensive Plan.
4. The cost of any capital improvements required to implement paragraph 3 above
shall be the sole initial responsibility of the developer. Any late corner
provisions provided by local ordinance shall apply.
Very truly yours, '
/4 Od.‘k-kt____)
Donald G. Nelson D emens
Building do Zoning Director Policy Development Director
'chard C. Houghton /
Public Works Director
cc: Mr. Joel Haggard
.-•'-'
-----.........__.—.
... - -
• ,),:i.;,...„.4.i!--,
:,•4i.n,
- •
_ ______ _____.r.• .____ 1,1 --,-. . „ ••).‘
...
'i. •i,
-....L.
•••••
\.\ „. \ --1,,, • 0,
s.i•\-•••''
i •
. .,%----:-...'77:-_---:-•-&/.,.
• 1.• ' .\
' • • •—••• .." • ,
••• .
... . . • ..,, _.. •
'...k *. ..
'" \\\ ; --; s ' ' - • . . ,
1/1"; \- 4* - '
i 4 /
A. - •\ ,
• .. d. ..' .4..• •
t.\\\\ •' • , - . -7 '
• • Iht' ;41ea. .=X\'• \kt\t‘c"..\•• •
t-,,,\•.:,,t / .
...44 /
/•' ,.
••••k- ...\,, j %,•\\\, %
00.3=Irwx..
•
.' .
I /i
. _.
.../ „
/.. - ,,, •,
.1 • / • I
. .
• \ ••••,, a
.
.'
:''• / / I , .
\ • • ,
' .•.--.' ' '-"--'‘NN %.. \\
V ,'. .% ` / I
/ ''' 1. ,. I, ../
;,,,„ • \ ( a \. • -..'" ‹:, `,,•\\ . .\
\::•S . 'fl — ----- %
. .• 4 •\K .‘,
V. \\‘.. .. \I\1---••..
''''\ .. • „
-....--
..-‘" ‘.
.
,
\ '
•
\
- ' \'
. --
.. a
i'• ..
..,
I .
'
\\\
's...:\ ,
''• ! ?. • -.. .., I . ... ,•%
• e••,
-..., '
.'''..
. ,)r‘
... - ... \ \
‘.....4,... .
\ t' -
+,. •
t 44r '
N- - \
•--..,
•
\\ % / ,
r
•
1 , • 4
1 ,.. . i
, A... .
./. \\
' „
•. •/
.
\\W.,
. '
•
•:,\\\\..,•
.
.-.
\ \ $ ,' % • .
• ,
% r\
•
..... . . ,
,./A'•k ,. .' \\,‘ .1 -•••• 11 I ) , • ., .
;-.:--
,. , \ r, ...„ , .
, , , , , , , x__, 1 \
1 1 •
r
„ ..;1 / " ••• \
: ' i, , /
• 7341,
•
..
.
• . . .
4„, /,,
, . . . ,
. . ..„ . :
, . ,i •,..„
..,, , „ , .
../..„,., , • ,
if .., /,
,.., , , . ,„. , .. %
'.
..V1 / 7 • 't
.i
-s
' /1/
‘ • ;, / \ : \
, i k
,•
,
___N• , ,
-'.
.1/ - - , , ...-
/ \. ,
,
, .
1111 P •
•
- ,
X /I• , `,. .
•
1 iS
•••...'
• ..I
. / • N, .
•
,
•
1.. .. -- s'''''''' A =
•
.
•
!; • •
. • ...----- ‘• 1,f .
0'k)
., ,o,.
. 1 • .
; . j:1(
7' r N. I • : ' '
. • • . •I
1 ..• ••••
'
,- r -• .
....."," , .1
MC It II'-• • •
. ; !
. ( —,
.... ; ;
,
' 1 I AI;\
. . ; •‘ ''...'
( I •
1 .---;
'
06 ..., k k
• \,.• ...
,. _..ii......,--.
/
_
0 .. . .. ..
,,
1 .'\ !••
i .• : dolis . ••
......
, .•
. .\ ...
• • :
, , • • .
.• . ,S. 1
n1 • ... -
,. • . ,RI •\.\.,' , .
I ' ' •
\--\,...•, - ',I
• .
•
r ,. „..,
-,. \ , . ,. , J-• ...
;.
.-0 , ,
,
- .
...2. - : , •o • ,\,.‘ , ? -. ,
' s 'i.''.‘s. '•..:, \ \ /'I
•.. ,
\
•
10 1•1\1,v.,•:.; ..s ,\ v..,/...' .. '\ •• ;s
....,
•------4:N- ;
4 '`,- h'`•', '•\ t.."...• i ,r," .7,- , ‘,, / ..:
•••• „,...--.-- .... ..
\''..- • •
Orill'111:-.:-.1.t, ' 4/ ,./..••••-• • •r,
• i'.
/
\ 1 / ,Il N. 4 _
•
,
, , 1
.,
\
"
,'
•,‘,.
, „./ ,A
-"--., '... .
• ....
".- \Z\ •
, i \
s. i• ' 's \
\ -
-•:.•-\\ , . - .,
•.1 I
I i i •14his4
• .. e
•.. '
'.- . - -.• -s... 1---..,- ,..-.._-_- . -- Na, 4‘
\ % '.. '•'4
.-.•:.; ;
•,.:I
.z. s ,/ .ss '•
/ ..&''.':-..." 1 ' . . I ' ••. •
0 , ?
1 • • • \-,..,
--.. , t
. .:. ‘..
LI .,
\N•'• • W' \, ;1 k 1,L . •
• • . .,
'I% ' .. '.., -.• . `,‘.. •„'.. I .
.t
.,, .N: .:. ' ., --••'`‘1
.. .
•
• .,:... ,
•
•\,•;‘'1•. 'N •'••. 1
• .,
..,
.,-s_______j._____ .--:•,,,
_ •.. '''''
,;,.• ,.., . _
r .
'N-, •,.
• • r. ,
-, \ tl'.: 1 - • ,
s•-- •
. REN' N BUILDING & ZONING DEF' 'ITMENT
DEVELOPMENT APPLICATION REVIEW SHEET
ECF — —
i
i
APPLICATION NO(S) : REZONE (R-129-80)
PROPONENT: Altera Corporation (Del Bonds)
PROJECT TITLE : Black River Office Park
BRIEF DESCRIPTION OF PROJECT: Application to rezone 71.16 acres of property from
G-1 to MP for warehouse and office development.
LOCATION : The property is bounded on the north by the Burlington Northern Railroad right-
of-way, on the east by the Sunpointe Condominiums, on the south by the former Earlington
Colt Course and on the west by Monster Road ana the r-1 pumping station.
TO:
El PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE :
• 0 ENGINEERING DIVISION •
0 TRAFFIC ENG. DIVISION SCHEDULED HEARING DATE : 6-15-82
OUTILITIES ENG . DIVISION
El FIRE PREVENTION BUREAU
• PARKS & RECREATION DEPARTMENT
O BUILDING & ZONING DEPARTMENT
iikPOLICE DEPARTMENT
POLICY DEVELOPMENT DEPARTMENT
O OTHERS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING . PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5:00 P.M. ON
REVIEWING DEPARTMENT/DIVISION : /4C� 44,,,1 .
APPROVED APPROVED WIT CONDITIONS 0 NOT APPROVED
©,i /(- � // 4i/ /d/1/41(d . *0/ I7'7of
61, EIZia% el/A at"a/ 4/7 o'oef-d 7e. Wee./ ide,6,, ,.
4.- 2,4;
©e0‘ ,l - lem, 5 /10! / 4 3,
cv fce ,,m4m7 e/167/vp,oaV
/ - .le f-v- jr. .1 /! Jam: itT
4,& Q 4/ ? if %7 /e/ -./ /,� .fir
"o-/4; 0.ip itiit,e/ . 1o*`
DATE: 01
SIGNA F IRECTOR OR AUTHORIZED REPRESENTATIVE
REVISION 5/1982
14, TON BUILDING & ZONING 1 9ARTMENT
t
DEVELOPMENT APPLICATION REVIEW SHEET -
ECF - -
APPLICATION NO(S) : REZONE (R-129-80)
PROPONENT: Altera Corporation (Del Bonds)
PROJECT TITLE: Black River Office Park
BRIEF DESCRIPTION OF PROJECT: Application to rezone 71.16 acres of property from
G-1 to MP for warehouse and office development.
LOCATION : The property is bounded on the north by the Burlington Northern Railroad right-
of-way, on the east by the Sunpointe Condominiums, on he south by the former Earlington
Goit Course and on the west by Monster Koaa ar}a the k'-1 pumping stariall.
TO: •
PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE :
F4,5, ENGINEERING DIVISION
LI TRAFFIC ENG . DIVISION SCHEDULED HEARING DATE : 6-15-82
El UTILITIES ENG . DIVISION
El FIRE PREVENTION BUREAU
PARKS & RECREATION DEPARTMENT ;
El BUILDING & ZONING DEPARTMENT
Ei POLICE DEPARTMENT
POLICY DEVELOPMENT DEPARTMENT
OTHERS :
•
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING . PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5:00 P .M. ON
REVIEWING DEPARTMENT/DIVISION :
APPROVED ® APPROVED WITH CONDITIONS El NOT APPROVED
cat/.7, ,610 -C_/ir
Z / ( C-.�.� �`�C j_G ti � f L C��� C:C-C Z (/...
L
2h `-V�-C� : ��Z-"i�-G '.-!L.!c- ( �`..� l/c�..vL.�C���--`-.i,L_�, 6 L-�r�. .�
/ %-,�
;2 - C. 77 1 1 =t.-ct eC
?';4,
: ti r' Gl }=�� �,� ��t,= , DATE: �� ' 7
SIGNATURE OF DIRECTOR OR AUTHORIZED REPRESENTATIVE
REVISION 5/1982
•
REN N BUILDING & ZONING DE ITMENT
DEVELOPMENT APPLICATION REVIEW SHEET
ECF - -
APPLICATION NO(S) : REZONE (R-129-80)
PROPONENT: Altera Corporation (Del Bonds>
PROJECT TITLE : Black River Office Park
BRIEF DESCRIPTION OF PROJECT: Application to rezone 71.16 acres of property from
G-1 to MP for warehouse and office development.
LOCATION : The property is bounded on the north by the Burlington Northern Railroad right-
of-way, on the east by the Sunpointe Condominiums, on the south by the former Earlington
Goit Course and on the west by Monster Road ana ERe r-I pumping stacrbn.
TO: •
El PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE :
0 ENGINEERING DIVISION •
TRAFFIC ENG, DIVISION SCHEDULED HEARING DATE : 6-15-82
111 UTILITIES ENG , DIVISION
El FIRE PREVENTION BUREAU
El PARKS & RECREATION DEPARTMENT
El BUILDING & ZONING DEPARTMENT
® POLICE DEPARTMENT
POLICY DEVELOPMENT DEPARTMENT
OTHERS :
•
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING , PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5:00 P .M. ON
REVIEWING DEPARTMENT/DIVISION :
1=1 APPROVED J APPROYED WITH CONDITIONS 1=1 NOT APPROVED
Conditions: ( 6„
Prepare a detailed traffic analysis for the proposed development with the boundaries
being Sunset on the north, Rainier on the east, 405 on the south and Valley Parkway
on the west side.
If the analysis shows that any of the intersections within those boundaries are
impacted and puts the intersection at a level of service C or below, they make any
improvements necessary to maintain the LOS that existed prior to their development.
If the existing LOS is above LOS C, they will make improvements required to keep the
intersection at LOS C.
DATE: 6-5-9
S MATURE OF DIRECTOR OR AUTHORIZED REPRESENTATIVE
P71TON BUILDING & ZONING PARTMENT
DEVELOPMENT APPLICATION REVIEW SHEET
ECF - -
APPLICATION NO(S) : REZONE (R-129-80)
PROPONENT: Altera Corporation (Del Bonds)
PROJECT TITLE : Black River Office Park
BRIEF DESCRIPTION OF PROJECT: Application to rezone 71.16 acres of property from
G-1 to MP for warehouse and office development.
LOCATION : The property is bounded on the north by the Burlington Northern Railroad right-
of-way, on the east by the Sunpointe Condominiums, on the south by the former Earlington
Golt Course and on the west by Monster Koau ana the r-I pumping station.
TO: •
OPUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE :
• ENGINEERING DIVISION •
TRAFFIC ENG. DIVISION SCHEDULED HEARING DATE: 6-15-82
UTILITIES ENG . DIVISION
L_.IFIRE PREVENTION BUREAU
OPARKS & RECREATION DEPARTMENT
OBUILDING & ZONING DEPARTMENT
LI POLICE DEPARTMENT
OPOLICY DEVELOPMENT DEPARTMENT
DOTHERS :
•
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING , PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT , '
BY 5:00 P.M. ON
REVIEWING DEPARTMENT/DIVISION :
DAPPROVED El APPROVED WITH CONDITIONS ONOT APPROVED
Lc - c
_c�l�C .��yu(' /. ,�c-.� c,c: :Ze e i� c �:�,�._1C� L Cam` '' ` L �i ,•C
1:6% ZLA-c ..��-ILL.< .t-� e•-(e 1-_.�-���-ate/. . --+�� �.c:.i.C.c'_-C1.:/.3-�
J/ mot' ✓ 1
/' �� .`j_/"::-4, DATE : K - S- -A 2
SIGNATURE OF DIRECTOR OR AUTHORIZED REPRESENTATIVE
REVISION 5/1982
F,`h`'TON BUILDING & ZONING ?ARTMENT ,`.
DEVELOPMENT APPLICATION REVIEW SHEET
ECF - -
APPLICATION NO(S) : REZONE (R-129-80)
PROPONENT: Altera Corporation (Del Bonds)
PROJECT TITLE : r Black River Office Park
BRIEF DESCRIPTION OF PROJECT: Application to rezone 71.16 acres of property from
G-1 to MP for warehouse and office development.
LOCATION : The property is bounded on the north by the Burlington Northern Railroad right-
of-way, on the east by the Sunpointe Condominiums, on the south by the former Earlington
Golt Course and on phe west by Monster Road and cne 'r-I pumping station.
TO: • •
0 PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE :
• 0 ENGINEERING DIVISION •
flTRAFFC ENG, DIVISION SCHEDULED HEARING DATE : 6-15-82
LJUTILITIES ENG , DIVISION
FIRE PREVENTION BUREAU N
PARKS & RECREATION DEPARTMENT
El BUILDING & ZONING DEPARTMENT
0 POLICE DEPARTMENT
0 POLICY DEVELOPMENT DEPARTMENT
0 OTHERS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING, PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT '
BY 5:00 P.M. ON ,
REVIEWING DEPARTMENT/DIVISION : '/ /
5] APPROVED ❑ APPROVED WITH CONDITIONS 0 NOT APPROVED
,/(-6 d r. y , _% c.,
. . .'ah/i , ,(.4e-+‘V t;,e,t_-,
r ,-,0.„ ,_-_,,z, . .... ..,„,..,,,,,,„:„
,,,„_,,,,,,..1 ,„ ,,,,,,. ,,_ _
`` DATE; ‘- 7 12-
SIGNATURE F D RECTOR OR AUTHORIZED REPRESENTATIVE
DCUICIA,J a,lnoft
REtsr V BUILDING & ZONING DEF :1TMENT
`c DEVELOPMENT APPLICATION REVIEW SHEET
ECF — —
APPLICATION NO(S) : REZONE (R-129-80)
PROPONENT: Altera Corporation (Del Bonds)
PROJECT TITLE : Black River Office Park
BRIEF DESCRIPTION OF PROJECT: Application to rezone 71.16 acres of property from
G-1 to MP for warehouse and office development.
LOCATION : The property is bounded on the north by the Burlington Northern Railroad right-
of-way, on the east by the Sunpointe Condominiums, on the south by the former Earlington
Gott Course and on the west by Monster Road ana the r-I pumping staLiun.
TO: •
OPUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE :
EIENGINEERING DIVISION •
❑.TRAFFIC ENG. DIVISION SCHEDULED HEARING DATE : 6-15-82
DUTILITIES ENG . DIVISION
OFIRE PREVENTION BUREAU
OPARKS & RECREATION DEPARTMENT
'BUILDING & ZONING DEPARTMENT
OPOLICE DEPARTMENT
OPOLICY DEVELOPMENT DEPARTMENT
IDOTHERS :
•
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING . PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5:00 P.M. ON
REVIEWING DEPARTMENT/DIVISION : R L
APPROVED NAPPROVED WITH CONDITIONS NOT APPROVED
Paz , Q .C. 2 E—cQ u AAE ITS
DATE:
SIG�. t OF DIRECTOR AUTHORIZED REPRESENTATIVE
QCV.Q.AM R./7 0Q,)
OF R4,1
4
t$ © ° BUILDING & ZONING DEPARTMENT
RONALD G. NELSON - DIRECTOR
o
09 MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON. WASH. 98055 • 235-2540
0,9gT�O SEP-C e`'°
BARBARA Y. SHINPOCH
MAYOR
May 20, 1982
Mr. Joel Haggard
Haggard, Tousley & Brain
1700 Daon Building
720 Olive Way
Seattle, WA 98101
Dear Mr. Haggard:
In response to the copy of the letter sent to Mr. Ron Neubauer concerning the public
hearing for Black River Office Park, I would tentatively agree that the public hearing
has been tentatively scheduled for June 15, 1982. This is conditioned upon receiving
the revised application by Friday, May 21, 1982. This would provide us with sufficient
time to review the updated application and prepare the staff report which we would
need to have completed by June 1, 1982. If the information that you are supplying
does not reach us by the 21st, then the hearing time will be adjusted appropriately.
Sincerely,
�
Roger Blaylock
g Y
Zoning Administrator
RJd:cl
L _:J QHEu§
�LJLJ Q_ I
rca
PROJECT Black River Office Park
(name, address): nchord Carothers associates
PROJECT NO: 8205
K.6`6e' Reply to:
TO: Reber Blaylock 814 East Pike Street
City of Renton ® Seattle,Washington 98122
1
Zoning Department 0 Boise.154West IdahoFranklin83702 Street
200 Mill Avenue South 11480 Sunset Hills Road
Renton, WA 98005 ❑ Reston,Virginia 22090
❑ 4 S. nue
Portlan08W.d,Oregon2ndAve97204
WE ARE FORWARDING THE FOLLOWING: )t ATTACHED ❑ UNDER SEPARATE COVER VIA
❑ Original Drawings 0 Contract Documents 0
❑ Specifications 0 Request for Proposal 0
❑ Photographs/Slides [XI Prints 0
❑ Shop Drawings 0 Equipment Submittals 0
DRAWING NO. COPIES TITLE OR DESCRIPTION DATE SIZE
2 ea. Conceptual Land Use/Preservation Plan 5/21/82 30 x 60
Richard Carothers Associates
BY: —.._
T. Gessford •
COPIES TO: Joel Haggard DATE: 5/21/82
ggiri•GR
o Perrc . P°440Y
0 j2)4
HAGGARD, TOUSLEY & BRAIN
ATTORNEYS AND COUNSELORS AT LAW
RUSSELL F.TOUSLEY 1700 DAON BUILDING
JOEL E.HAGGARD 720 OLIVE WAY
CHRISTOPHER I.BRAIN SEATTLE,WASHINGTON 98101 TELECOPIER
WILLIAM N. SNELL 1206)624-5299 (206)624-8959
WILLIAM H. BLOCK
MICHAEL G. FULBRIGHT
KIM D. STEPHENS
OUR FILE NO:
May 13, 1982
N-15004
Ron Neubauer , Esq.
3rd Floor Duncan Building
Seattle, Washington 98104
Dear Ron:
This is to confirm for you our telephone
conversation with Mr . Roger Blaylock of the City of Renton
relative to the rezone hearing on your property. It has
been set for June 15, 1982 and appropriate notices will be
timely made by the City in the future.
Sincerely yours,
HAGGAR , T6USLEY & BRAIN
oel Haggard
JEH/ag
4648B
cc : Mr . Del Bonds
Mike Hunsinger , Esq.
Mr . Roger Blaylock
uF REm
�v \', d �
nAi 1 q ,�.
r„.„ w"9S City of Tukwila
i6200 Southcenter Boulevard
4
P 0Tukwila Washington 98188
b\i,./90e. Frank Todd, Mayor
4 May 1982
City of Renton
Planning Department CITY OF RENTON
200 Mill Ave So.
Renton, WA 98005 MAY 1 U 1982
Attn: Dave Clemens , Planning Director
POLICY
()fvFL.OPMFNT f'I FT
SUBJECT: Black River Office Park
Although we did not take the opportunity to comment on the draft environmental
impact statement for this project, we now have concerns that development ap-
proval of this project in the absence of eastside drainage improvements is pre-
lude to disaster. The disposition of floodwaters and the project's anticipated
impact on drainage basin storage capacity could result in major adverse im-
pacts. The"unavoidable adverse impact" section on Page 57 of the DEIS under
the topic heading "Floods" indicates that the project will contribute to flood
conditions until construction of the P-1 Channel is completed. Yet, on Page
88, the following statement appears in context of discussing the Eastside Wa-
tershed Project:
"Planning for the Eastside Watershed Project has been under
consideration more than 15 years . Due to this lengthy time
frame, the possiblity that the drainage project may not be
completed should be examined. In the absence of an S.C.S .
channel system, stormwater drainage from the project site and
from other urban developments within the Black River drainage
sub-basin would severely impact the existing drainage system. "
The report than goes on to state:
"Local jurisdictions would have to seek alternative means of handling
stormwater runoff. Conceivably, Springbrook Creek would need to be improved
and stormwater storage facilities would have to be provided at various loca-
tions in the valley. "
In this era of restricted local government budgets and diminished expectations
of Federal assitance. the "alternative means" of dealing with excessive run-off
in downstream communities such as Tukwila, Duwamish and Allentown are relatively
few.
Page Two
Dave Clemens
4 May 1982
Hopefully, development approval of this proposed action will not precede a
determination of the Eastside'Drainage Basin improvement requirements.
Thank you for your attention to our concerns.
TUKWILA PLANNING DEPARTMENT
-�C G Q
Brad Collins, AICP
Planning Director
BC/mc
OF k4,4
•
*11y CD THE CITY OF RENTON
Co
POLICY DEVELOPMENT DEPARTMENT • 235-2552
p °' MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055
9,0 co.
09gr6D SEPI°4-
April 20, 1982
BARBARA Y. SHINPOCH
MAYOR
Mr. Del Bonds
Alterra Corporation
P.O. Box 66101
Seattle, Washington 93166
RE: EIS EXPENSES: FEIS BLACK RIVER OFFICE PARK
Ref. : Client Ref. No. 230-7-80;
City of Renton Work Order No. 003-10-80
Dear Mr. Bonds:
As the Black River Office Park environmental review process is soon to
be complete, we have made a review of your account and estimate that
approximately $6,000.00 in addition will be required in order to meet
outstanding and anticipated invoices and expenses.
As you know, an invoice for $4556.00 has been submitted by R. W.
Thorpe and Associates. In addition, they anticipate approximately
$150.00 to be submitted in miscellaneous fees. City of Renton staff
review costs are now being tabulated, and to date they approximate
$700.00. Mailing costs for the final environmental impact statement
are estimated at $130.00.
You may expect a more detailed accounting, when the account is closed.
Any moniesi in excess will be refunded, or any overage will be invoiced.
Very rUly your
11661 ''
D i . Cle ns 4(��'""
Policy Development Director
cc: R. W. Thorpe and Associates
R. J. Blaylock, Zoning Administrator
/ : , -Gr-9D
/
21)
0
February 9 , 1982
Mr. David R. Clemens
Acting Planning Director
City of Renton
Municipal Building
200 Mill Avenue South
Renton, WA 98055
Re : Alterra Corporation/P-1 Channel
Dear Dave:
For the last few weeks , intensive discussions regarding
land acquisition for Pond Development for P-1 Channel
have taken place.. As one property owner involved , we
have reviewed this matter. As you are aware, we have a
pending re-zone application before the City of Renton.
The final EIS is expected to be published soon, and
hearings are anticipated in the near future.
We are willing to execute a deed in form substantially
similar to Exhibit "A" attached hereto, by which
approximately seven (7) acres of our property would be
donated to the City of Renton. This offer assumes that
the P-1 Channel and Pond Development will be completed
within the next twelve (12) months. This offer further
assumes that the donated property would be credited by
the City of Renton against any open space requirement
associated with the development of our property when
re-zoned as requested.
This offer also assumes that the requested re-zone will
be granted subject to the conditions that are , in our
opinion, reasonable.
r ., ~
r
So long as the above assumptions are realized , the deed
will be delivered to the City of Renton at no cost to
the city. In so doing, however , we further assume that
the fair market value of the seven ( 7) acres will be
credited against any assessments or charges levied
against our property in connection with the P-1 Channel
project.
ry truly y ur
DELTON J. BONDS, PRESIDENT
ALTERRA CORPORATION
DJB:JW
Attachment
OF I? /
A.
.*. . . THE CITY OF RENTON
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH.98055
PAL jz>
BARBARA Y. SHINPOCH, MAYOR • PLANNING DEPARTMENT
090 235— 2550
o9q, O SEPc�
November 3, 1981
Michael D. Hunsinger
Neubauer & Mussehl
315 Second Avenue S.
Seattle, Washington 98104
RE: BLACK RIVER INDUSTRIAL PARK
Dear Mr. Hunsinger:
The City of Renton is in receipt of your letter of October 27, 1981 indicating that
Alterra Corporation is willing to donate the right of way for the P-1 channel and
retaining pond. Although we are pleased that the developer is interested in pursuing
this action, the two conditions listed are neither appropriate in terms of their content
nor timing. Since discussions are, continuing on this subject, we will await further
revisions to this proposal as you see fit.
Very uu y yours, ,r
f
D id R. lemens
Acting Planning Director
DRC:cl
cc: Barbara Y. Shinpoch, Mayor
Michael Parness, Administrative Assistant
Lawrence J. Warren, City Attorney
Richard C. Houghton, Public Works Director
,
Law Offices
NEUBAUER and MUSSEHL
The Duncan Building
315 Second Avenue South
Seattle, Washington 98104
(206) 622-7050
RONALD G.NEUBAUER,P.S. y
ROBERT C. MUSSEHL ; t' 1 �_
MORRIS H. ROSENBERG
MICHAEL D. HUNSINGER October 27, 1981 ,n\`l;Cr� '
DAVID M. ABERCROMBIE \
Of Counsel1CsV, 1,
JOHN W. FLYNN ci - I i
JEFFREY MICHAEL GRIEFF C� IY,r�i
Mr. David Clemens �=
Acting Planning Director
The City of Renton
Municipal Building
200 Mill Avenue South
Renton, Washington 98055
Re: Black River Industrial Park
Dear Dave:
The purpose of this letter is to notify you of the
intent of my client, Alterra Corporation, to donate to
King County that parcel located within the property
owned by Alterra Corporation necessary for the P-1
Channel and retaining pond. We are in the process of
preparing the quit claim deeds at this time: I expect
that will take a week or two to iron out.
Our quit claim deed will be made with the following
conditions : That my client' s application for rezoning
of their 71 acres to Manufacturing Park and the P-1
Channel Project itself, both are passed by December 31,
1981. If either of those two events do not occur by that
date, the property will automatically revert to my client.
I will be forwarding a copy of the deed to you when it
is completed. If you have any questions , please don' t
hesitate to call me.
Very truly yours,
tjALLSAVA.A3.51
MICHAEL D. HUNSINGER
MDH:jj
of R� 6,&) G
qi
% ° PUBLIC WORKS DEPARTMENT
Nte
TRAFFIC ENGINEERING DIVISION • 235-2620
mil
MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH. 98055
9,0 co.
0,9gT�O SEP�E� 0� R ET
BARBARA Y. SHINPOCH 1�,1LD
MAYOR AugustAIL
771// �7, 1981 V
/06 1© 1981
TO : David Clemens, Acting Planning Director
`9\iy�NG �EQP,f
FROM : Richard C. Houghton, Acting Public Works Director --��
SUBJECT : Black River Office Park
Please be advised that David Markley of The Transpo Group, Bob Thorpe of R. W.
Thorpe & Associates, Gary Norris and myself met to discuss the EIS for the
subject proposal .
From that meeting, we determined that the best approach would be a document
which addressed the overall traffic impacts of the range of possible developments
on that parcel of land. From such an analysis, we believe that we can develop
a "feel" for the appropriate scale for the proposed development.
When a definite proposal is secured for that parcel of land, the developer will
be required to do an in-depth traffic operational study to define problem areas
and offer measures of mitigation. This analysis will involve all critical
intersections within an area defined by FAI 405 on the south, Sunset Highway
on the north, Rainier Ave. on the east and West Valley Highway on the west.
The above should be placed as a condition for all permit processes regarding this
parcel of property.
If you have any questions, please contact Gary Norris. Thank you.
GAN:ad
cc: David Markley
Bob Thorpe
Clint Morgan
14/
hik,v
/ /t/ st - 7-)1,9174041
/Z - /let 07 Sd— 6"--112?-i c/Att6
".10 (;t - &ids /6646-;y/
Cre9, 4674 Atzh y
,1;6p/fie Dind5 - &kV einfr
.0 64 -/3m,c1,5 Era wig d
S - eik ;fie 6,5f5
eth19, doi4 ,&11. 41o. z-o
Led 19 - Lty
Bc(./ 167. - 4.4 litAcit6 rn thitif
4/01. 221 Ct _ eit/tA Ace/- f�i cCesecss cm/+wiea
;ttagh,l(6 v.o_ Mkt — CS/ 6.devav 1
a A
3 .wary 22) l 8J
yte.,o
!D= :74s
fiZoM C M Will ict4,1-s
Ala c k;L_ iwtAdricii Pw&k
M ee.4-01, To DisG.4.44- eed EIS
3Uooratit �CYetts-e—
Ziotki Ficr, Thole,R.�✓
�`ev�
M i ke, Lee, wild li 1/FlorL £- tcuilf a4
Gle,nens
C1.47 Ge&c. I„Ji I I ia.•.s if-A-
tied et. .d `Pfa-..-1- Rudt- f c u .4.
-ble f' I Yi-c- bru- 1.5 ,,,, . dt.0 Q. A- 1u p4s-ec( ctux4co-
owdicifotdw- a .
_ \
ly
d ICI
lie
4 It/0° _14 pro 124.14/ sin 04„tof
4. Flora A-0 e‘iiSe ��s�
Impacts kag � trine *"4 1 sfame
Approximately 84% of the site consists of a unique wetland
deciduous forest, a part of the largest forest of this ty1 e in the
Seattle area. As a result of the proposed action abou 65% ;of this
riparian forest would be removed and be replaced by building
foundations, roads and parking areas.
Mitigating Measures
- As many of the existing trees as possible should be retained
through maintenance of green belt areas in order that large I!
groups of trees and understory remain undisturbed.
- A master landscape plan will be prepared to assure good design
practice and preservation of as much of the riparian vegetation
as possible. .
- Placement of building sites, parking lots and roads should be
it
based on tree inventories provided by field surveys. --
- Vegetation along the Black River Channel should be preserved
and maintained by the proponent. it
f�1
5. Fauna
,11
Impacts
II
Removal of most wildlife habitat and reduction in most native
wildlife due to intrusion of human activity.
•
Mitigating Measures
- Landscaping materials that provide food sources for birds and li
1'i s
small animals should be utilized.
- As much natural vegetation should be retained as possible. I!'
- Surface water qualityalongpi,agl ��
-S �nr��b��ic C i e e�c should o u l d b e
preserved by planting natural riparian vegetation along the
q,a
drainage-way banks and maintaining wetlands wherever possible. !r
.114
= -
:,I
c-pf
-rbrt 7/ 1 r-fa /di/ (C2 Thrvw
'n"Y/•lam '�` -5 } /(61
,q'E'Y ef,
Jr - � _
1
t:•; ' i .... \11:i
. -
1-'
r '
. i
. .
.....,
' 'I . c• .
. . .
•
. ,
;i l
I
_,. -
P.
.1.i :• .r -',.\ 1 '.;••-• i.. --.1. 1:-.g.-. '
. .,,. •,, .4 s•• 4.
• i,..... or, ,, .tv-v, ,,, ;it,. ,4,-- -, i ''.' •:` ,- '''-'4 • . '
. i
P.-,..• ' 'I". -fi' -5 J:
? 6:' „i'' = 3. 0,„C.Yer5 -Ix. ,, Zi L - •.• , %r
0 Ei ..............----•-. qt.`,0' '• •,•' l'1,.-. .'i''•.a...
PHASE 2-384.! PHASE 1 "38A.0 RW THORPE AND ASSOCIATES
ex.
nil
ot.0 , _.,...,...-. ;„ • ' ""4%...4.- I AA ,.
• ...-
• . ,
0 100 400 800 NORTH
1 0 6 r: . i.e.t .
eA.,.
• a o.
,-.4.• ..-C.) .t.i -A
kr. ii
0 n l.'ss..I .....
°II _. '. lo..:•,.. ,
..-elp.i- . _tkr- N -"e--1:1 'W 006 a •-, 4%\ `II P. -*als.,.
„.....,..4,5;..):(53 -Ili,..,,,,,,--;-',,,:iish, c::::3 --.6.• . 07.., ; ,..10,..., --,..-,, :,. , . „ -'44,,,,.,
si..ilikr ' po 41,
• '4 ej
,_...-.xr7/:4w•*.'.+.,"-....,i.,e.e_-,r,t 4..i 0 4
1r.,4 7.c4 4t v,."..4r-0. ,,„,p•..a.tft-P 0w.v. kvoA,.,a4'''','.4 .of1f•• 1 '''- `I'
--'.4:-.',,•„—o.'
a
4 01 0 tlei°m":..a 6r4i_.0i
c1
a , Ar4 • cO / rqa f ,l-
'o41
ff11s.;
,:..,#•:-:L4i:,::1„01:;"11AY1.v5l• .'.1
.ars3,p-r ba V.....E4--4,L_.4,,
OP.M
NT
pj ir
_ ,... woe
.....
1 '
-A- ".,. ...ft .
. n ;,...., ..... c.„...,_,,
______ __ 4
V '
1 ir§:"Vc.,.......
' EP. l- r ) NORTH
0 —____
... ./.-----s ).il—'•-i
c? •
xi 2 ,...„.......,___
. . ,-...
. i
. \ .
I ,
33 C • • . .
. • ..
•
e 1
.•
Igo NM
(10 4 . •
1 1
En M
0
0 1 .
m .
- - - -
...._ _
------ - -- - -- _.__ ___.______•__ _
•
.
. _._,::_„.2.„,,._-_•_-_,.-.,:.,-.:-.--..--.7,,, ,,F, -.:•_,-,,.--_-,..„--•-:,I ,,.., -:•---- -.,-. -_,•-,.,-.-;, •: -------,... ..,..--.,-;,:i;::FL.,-2_4. -...,':•-:.:•-_,7 :-,_,--;..-li."44f4"-"'1.:.4 .-:- .-.,:-_ -1'.fi,V-.47-i&V.44.1'-':; ',: ,---..*:-'‘.7...4--..'_'.:'-..:J.--,-,-;-.---...f-;--Z-_,--'72 -1-,—...:7;.-:.iz-:17-:-,,-_.-tr..-z':;-'"-------z.•-.z.
10
iMitigating Measures
- Insulation in roof, walls, , flooring and glass should be
Iutilized. .
r - Energy analysis of building design should be performed.
6. Communication
1 Impacts
Increase in demand for telephone service.
Mitigating Measures
1 ; - All telephone lines will be installed underground.
- Installation of telephone lines will be coordinated with
IIinstallation of electrical lines.
i _ 7. Public Utilities •
Impacts
1 Existing water supply and system would experience .some
additional demand. Deterioration of water quality entering the
combined sewer and storm drainage system is ' possible during
construction activities. In the long-term, the quantity of
water entering the system will increase due to increased
impervious surfaces on the site. Also, project development
11 would generate increased solid waste and sewage flows from the
site.
1
Mitigating Measures
1 • Site runoff will be directed to the old Black River Channel
where it will receive wetland treatment prior to its discharge
into Springbrook Creek.-
8. Human Health
Impacts
Increased noise levels due to construction, traffic and other
human activities may aggrere a+read,y y,a„ ija, ,, - -,a_
1 . b s of rt
A,
y es
I
15
B. Air
1. Increased air pollution from automobile emissions.
2. Increased particulate levels due to construction activity and
additional traffic volumes.
. 3. Short-term odors during construction activities.
C. Water I`
1. Increased surface runoff from the site which may contain an increased
level of urban pollutants.
•
2. Potential alteration of ground water movement, quantity and quality on
the site. lk
•
D. Mora 6/ .VP "11•4- rafegya�� x..
-z=%cl!--i � � natural vegetation on the sito� ,�d be.. rewss
E. Fauna11
1. A reduction in the ability of ,the site to serve as habitat • for
wildlife. 11
2. Reduction in number and diversity of wildlife.
Mi
F. Noise
11
1. Increased noise levels over the short-term due to construction
activity.
---2. Increased noise -levels- over the -long-term due to human activity and
increased traffic and rail volumes.
•,
G. Light and Glare
Light and glare will be emitted from the site to surrounding properties.
r � ,
° — — - -
•
42
•
rThe Land Use Report defines a number of community goals and objectives of
which the following pertain to the proposed development:
1. "Provide opportunities for employment of the City's residents within
convenient walking or commuting distance."
111 2. "Protect property values within the community for the benefit of its
residents and property owners, through the effective control of land
use and the enforcement and application of building and construction
codes."
11
3. "Encourage the development and utilization of land to its highest and
l best use in such a way as to promote the best interest of the
community and contribute to its overall attractiveness and desir-
ability as a place in which to work, shop, live, and play.
11 Comment:
The proposed action substantially conforms to each of the above goals and
objectives pertaining to the proposed development. The project will
provide opportunities of employment accessible to residents of the City.
11 The surrounding property values will be increased by the proposed action.
k. 5. City of Renton Zoning Code (See Figure 5 on following page)
The proposal is in an area currently zoned General Classification
District (G)--those areas annexed to the City for which o zoning
classification has been fixed or determined by Ordinance. -Fihlr
$1 tru.. 3$ 000 Fsp r9. -PeC Ws axe—e— pR.rvia`s` ems. -Kg— a a zava'- .
Comment:
11 Prior to project development, the entire site will be required to- be -
rezoned to Manufacturing Park, which permits essentially the same uses
sanctioned in the L-1, Light Industrial District. However, this zoning
designation imposes standards of intensity with respect to use and level
11 of external effects of the development on traffic congestion, noise
- levels, glare and heat, water and air pollution and fire and safety
hazards. To this end, standards regarding buffers, setbacks, screening
and bulk limitations have been established and will be complied with in
the development of the Black River Office Park. •
49
been placed. Just south of the railroad tracks, the topography of
the site generally slopes downward towards the south at a very low
Igradient.
Impacts
Grading and filling will occur in order to provide stable foundations
for flood proofing. Chan es in elevation are expected to vary only
slightly. A'4 .$ 4- • Z' lCDJc J) cal1c. .0®�5 �7" Tz/f midi�s -°-
oess ar visa /PAr a-�gc'� ,ems OP'tee Si eabD rs 412- Moir
® R
Mitigating Measures 3r,
Topographic changes could be restricted to limited areas of the site.
Unavoidable Adverse Impacts
Changes in contours of the site will occur.
1 D. Unique Physical Features
1 Existing Conditions
The site is part of a 70-acre climax riparian hardwood ecosystem, the
i last remaining example in the lower Green River Valley (Refer to the
discussion of Flora in Appendix C of this document.
1 The site is adjacent to the Springbrook Creek at the southwest corner
of the site. The creek is considered a "shoreline of significance"
and is protected by the Shoreline Management Act of 1971. The creek
will eventually be part of the planned P-1 Drainage Channel as
described on page 86.
The old Black River Channel meanders through the southern part of the
site. - - - -
1 Impacts
Develoment of the proposal will necessitate removal of much of the
1 portion of the riparian forest located on the site. Springbrook
Creek will remain unaltered. The Black River Channel will be •
I • protected by a 50 foot setback from the top of the bank.
51
The - following tables summarize data collected at a number of • -
monitoring stations in the general vicinity of the subject site.
1 -
n TABLE 1
[ - .,,),t, VP"
SUMMARY OF SUSPENDED PARTICULATE CONCENTRATIONS
RENTON AREA
I
Distance Suspended Particulates Washington
! From Site (micrograms per cubic meter) State
Locatio . (# on map) (Mi .) 1980 1979 1978 1977 1976 1975 Standard
I - Renton nicipal • -- --
• Bldg. 1 1.5 \ 37* 51 50 37 60
S.E. Di ict Health
Center 21 2.7 39* 4, 36 38 38 27 60
i 43
Southcenter (:) 1.2 49* WP 46 48 45 34. 60
I 5®
(Source: Puget Sound Air Pollution Control Agency, Air Quality Data Summary,
I 1977 and 1978; 1979., and 1980, Quarterly Air Monitoring Data Summary, Department
of Ecology, State of Washington.)
i * Based on less than 12 months data.
TABLE 2
iOTHER POLLUTANT CONCENTRATIONS
PARTS PER MILLION (PPM)
i , Carbon Hydro- Nitrogen
Monoxide Carbons Dioxide
(PPm) (PPm) (PPm)
il-- — - - - - - -- Distance 1-- D Study
From Site Period 1 Hour 8 Hour 6-9 AM Period
11 Location (:::::::;)
(Mi .) (mo. ,yr.) Max. Max. Avg. Avg.
r Puget Power Yard e) 1.8 6-7, 1977 3.2 2.0 0.37 0.02
3-4, 1977 4.2 3.3 • 0.28
10-11, 1976 8.1 6.6 0.01
il6-7, 1976 2.2 1.3 -- 0.04
_- - .(Source: Washington State Department of Transportation 1977 Monitoring)
68 '
Readings were taken by R.W. Thorpe & Associates using Quest ANSI 21.4 '
(Type 2) sound level meter with an attached wind screen. The sound
level meter was calibrated with Quest 2G-2728 calibrator before and
after each set of measurements. Weather was sunny and about 48
degrees with high clouds and winds between 0-5 miles per hour.
�, ram Noise Exposure Forecast contours for Renton Municipal Airport show the -
site to be outside the Noise Exposure Forecast (NEF) 25 line, although
A ' aircraft activity is audible. Aircraft activity is expected to
e. )` i I
ncrease slightly since the number of flights using the airport is
`a or expected to increase in the next 20 years according to the 1978
k_cf
�'' .s„, Airport Master Plan.
y
%'( 'C
During the daytime hours, there is occasional rail activity on the
04i lines adjacent to the site. Typical ranges of noise levels for these
\ activities are shown in Table 7 for various distances from the noise
c 'T - i source.
TABLE 6
TYPICAL NOISE LEVELS (dBA)
AT VARIOUS DISTANCES FROM RAILROAD ACTIVITIES I
Distance 1
Railroad Activity 50 feet 1/2 mile (2640' ) 1 mile (5280' )
1
Mainline Tracks
Coasting 75-85 55-65 -- 1
Normal Pulling 89-98 66-76 44-54
Whistle 91-120 68-92 46-70 1
Railyard
Switch Engine 61-72 46-52 1
Switching Impacts 83-95 62-73. 40-51
I
Source: Draft EIS for Earlington Woods Planned Unit Development, City of Renton
Planning Department, Renton, Washington, January 1979.
1
I
.
69
1 , Passing train noise levels can vary between 75 and 98 dBA at a
distance of 50 feet, depending on whether they are coasting or
pulling. At one-half mile distance, the range is 55 to 76 dBA. gi
ll
Trains are required by law to sound their whistles when crossing a ob
iright-of-way or when an object is blocking the track. Train whistles
can increase noise levels. by approximately 15 dBA for very short M.
periods of time, but there are no grade crossings in the vicinity and
whistle noises rarely occur within a mile of the site. y
Planned land use to the south of the site is industrial park, a
potential generator of noise from increased traffic and industrial
activities. Planned land use to the east of the site is a Planned /
Unit Development which would contain multiple-family housing and
business/commercial development. This residential use is considered }'
noise sensitive. d "
In summary, slightly adverse noise levels exist on much of the site
due to nearbyvehicular
v hicular traffic. Aircraft noise is audible but within
ithe acceptable range, and the adjacent rail activity produces
intermittent adverse noise levels for short time periods.
Impacts (S
hort-term)
is (Short term)
IDuring the construction period, noise levels will increase
substantially as outlined in Tables 7 and 8, pp.70-71 . Table 8
1 indicates the levels of noise generated by particular types of
equipment from certain distances. Table 9 illustrates the percentage
of time that machinery is operating at noisiest mode as well as the
potential abatement levels of that machinery.
i -- - __ ___-:7-- _ - - -_ -_ D
The residences to the north of the site, as well as those to be
Iconstructed to the east will be the most sensitive noise receptors of
the project construction noise.
Mitigating Measures (DuringConstruction)
g
a) Noisy operations should be scheduled so that they are not
concurrent. _ _ _-
- --
76
4
Mitigatin Measures
An alternative development design with limited building area could
retain significant areas of the site in open space. •
' i
• Unavoidable Adverse Impacts
a) Alternative land uses for the site would be precluded during the
/ life of the buildings.
b) The natural riparian forest existing on the site would be replaced
I/
with warehouse/office uses.
9. Natural Resources
Existing Conditions
The vegetation on the site and its open space characteristic are both
natural resources.
11
\\ Impacts
The proposed development will alter the majority of the existing open
space and cause the removal of most of the existing vegetation on the
site. il
11 Construction of the buildings and roads will consume natural
resources, including energy and raw materials used in concrete, steel ,
11
aluminum, glass, copper and other materials of varying scarcity.
11 Building operation will require cosumption of energy in the form of
electricity and natural gas. Gasoline and diesel fuels will be
expended by employee and service vehicles of the industrial park.
11
Mitigating Measures PI
Building elements could be analyzed for use of techniques, wherever
11
possible, permitting recovery of materials used in construction. •
Unavoidable Adverse Impacts
a) Consumption of building materials and energy.
b) Conversion-of natural open space to warehousing and office use
with removal of vegetation.
11
• least 5% or employees would occupy the s. t.c at any given time of
the day or night.
It is reasonable to assume that most of the permanent employees would
reside within a 20 to 30 minute commute of the site, but it is
difficult to specify precisely where the new residents would locate.
iti atin M g g Measures
None.
Unavoidable Adverse Impacts
None.
•
3. Transportation/Circulation
Vehicular Transportation Generated (Refer to Figures 2 and 3, pp.
xi_i and xiii)
A preliminary analysis of traffic impacts and mitigations associated
with the proposed action was conducted by the TRANSPO Group which
forms the basis for this discussion below. The consultant's letter
has been included in Appendix D beginning on page D-7.
Impacts
The project is proposed to be constructed in two phases. Access to
Phase I will be provided by a single road that connects to the pro-
posed road system which serves the Earlington Park Development. Phase
2, on the western portion of the site, will connect with the Phase 1
road system and will build a secondary access to Monster Road across
0.4:\vsr the proposed P 1 Channel.
•, Trip generation estimates were made using a range of assumptions re-
. S +;i4 garding building design and function (e.g. , one-story or two-story of-
Sy,.�ctti� fice buildings; office park or general office development, etc.) . The
'3\1\P- a.. Vnstitute of Transportation Engineers Trip Generation Manual, 1979 and
v,� a. 1 •QiiN"` 04 Arizona DOT Trip Generation Intensity Factors Manual, 1980, were the
06 44' 41 sources of trip generation rate information. Applying these trip gem-
° 09, eration rates, we found that this development could generate between
c c;R 2 v ' 9,070 and 34,030 vehicles per day_ (vPd) . The_evenin g peak hour_for
. " ,,p�� the warehousing generally is slightly before the traditional 4:30 to
_
I
85
Renton as a park , ' � ,.�.. ,tisitr -- . ,.-..
H *V" hW South and contiguous to the site is the
18-hole Earlington Golf Course. However, this golf course has been
proposed to be replaced by the Earlington Manufacturing Park.
The, site is presently very heavily vegetated, which precludes any
opportunity for traditional forms of active recreation and discourages
most attempts of passive recreation, such as nature walks and bird-
watching.
Impacts
Development of the site will preclude any future development or
designation for park use.
In conformance with the Green River Basin program and to be compatible
with Earlington Park's trail system, the project would continue the
lineal park along Springbrook Creek. Passive greenbelts will also be
included as indicated in the conceptual site plans. (Figure jig, on
page xiii.)
Mitigating Measures
None.
Unavoidable Adverse Impacts
None.
•
E. Maintenance
Existing Conditions
- Roads, water, sanitary sewers and- storm- drainage systems in the
vicinity of the project area are presently maintained by the City of
Renton.
Impacts
Demand for public maintenance of roads, water, sanitary sewers and
stormwater drainage systems will increase due to eventual development.
•
However, - tax revenues generated_ by future development would help
offset the cost of additional service.
-- - -�
• 87 ,.
r .
peak flows. Because of constraints in operating Howard Hanson Dam on
the Green River, continuous pumping capability is limited and storage
must be provided within the East Side Project system. Most Of this t.
stormwater storage will • be incorporated in two detention basins, one il '
of which will be located behind the P-1 pump plant adjacent to the •^ a.
subject site.
Springbrook Creel runs adjacent to the site. At the present time,
Springbrook Creek does not have sufficient capacity to pass flood
flows from upstream to the P-1 pump plant. The East Side Watershed
Project proposes to replace Springbrook Creek with a wider - 180 to
220 feet - man-made channel .
This channel would abut the subject site to the southwest. Because -, •
r
the subject site is situated close to the existing P-1 pump plant and
is adjacent to Springbrook Creek, stormwater drainage plans for the ;.4
development will be designed to deliver runoff to the creek and the
pump plant as quickly as possible. No permanent on-site retention is 1. Y
is anticipated. However, the proposed development would be expected
to participate fully in the East Side Project or in other drainage .
improvements in the area.
Another element of the S.C.S. East Side Project affecting the proposal
is a )9®acre detention basin immediately upstream of the pump plant
N :
and adjacent to Springbrook Creek. This basin, together with another
yy��
detention basin further upstream, t'rge been designed to provide flood
storage during periods of restricted pumping and to provide a large
drawdown pool for the pump plant. . .
RCr`rc
- _ The --locations of the P-1 Channel and the detention basin have
men:* iwe-l1. been determined by the Soil Conservation Service- f e'
khl sponsors. Later this ear,\S.C.1, 01\ let$' an e gine ring\design
co\tract\ that wi i i among othetthin s, result n a eci . l ollati`
fo hes ro ct ement and 'for t .e are re fired for em ar
P J P y t1
s ora o dred spo'l s. the eant i e, t 19• cre tora a basin
ha , beef to ativ ly sited ju\t wes of S ingb ok eek nd s uth f
___ • - the `Al ac Ri v r anct east rly o'.. the mp pl nt.
‘ /�, w����}�p ®® y may /, e^a
n ��
L t v ca 4. a C,�'4 t et(�vt 1 PI 6 IL--
I°
,
marts giA IP vonti xI ' ' tr,p,l: 4, IIP
. 92
C. Stormwater
Existing Conditions
Presently there is no closed stormwater drainage system on the site.
All water either percolates back into the ground, ponds, or flows off
the site in the form of runoff. Nearly all soils- on the site are
moist to wet throughout the year, with large areas of seasonal
ponding. An 18-inch line runs along Powell Avenue S.W. and empties
into a 36-inch line along S.W. 10th Street. This line empties into
Springbrook Creek south of the site. A 60-inch line along S.W. 7th
Street, which serves properties to the east, discharges into the old/ I'
Black River Channel . ��,,,�" v IAA°
` w° Eoly k "A 1.,)r ods 5a k 8
,. tee, glee of -foreas So L1/41-11pro r47
Runoff from the hillside north of the site is partially diked from theput,141,
site by the railroad. pvt044At 1A''
e
Impacts •
The total volume of runoff from the site will increase due to greater
impervious surface. The drainage system for the site will be designed
for no detention capacity and will be able to carry off a 25 year
frequency storm. It is planned that surface water runoff would be
directed to the existing Black River Channel to receive treatment
prior to discharge into Springbrook Creek.
Mitigating Measures
Site runoff will be directed to the old Black River Channel where it
will receive wetland treatment prior to discharge into Springbrook
Creek.
Unavoidable Adverse Impacts
_ Increased stormwater runoff-volume as a-result-of -project development. —
D. Solid Waste
Existing Conditions
The businesses and residences in the surrounding vicinity are
currently served by General Disposal Company. Dumpsters will be
required and can be rented from General Disposal , available in 1 to 40
94
Although noise levels during construction may exceed comfortable
levels for area residents, during occupancy, average noise levels are
expected to remain below the Washington State Department of Energy
Noise Limitations. (See Table 4, p. 67 .)
Mitigating Measures
See Noise - Mitigating Measures", p. 71-72.
Unavoidable Adverse Impacts
Increase in potential of aggravation of mental health of nearby
residents due to an increase in noise levels.
9. Aesthetics
Existing Conditions
The site, located at the southern base of Earlington Hill , is
presently undeveloped and heavily vegetated with riparian forest. It
serves as a visual extension of the open space provided by the
Earlington Golf Course to the south.
The site is most clearly visible from the Empire Estates residential
complex situated atop Earlington Hill to the north of the site. At
this time, southerly views from the higher units afford a vista
consisting of mixed deciduous and conifer hillside in the foreground,
Earlington Golf Course, Longacres and industrial warehousing in the
middle distance, and Mount Rainier and the Cascade foothills in the
far distance.
exing
The dvc hillside i., t- e southeast of Empire Estates is
slated to be replaced by the Earlington Woods Planned Unit
Development. -
Impacts
Development of the site will convert a dense riparian forest into an
office park characterized by warehouses and office buildings with
preserved wetland areas incorporated into the design. The development
will be --visible to occupants of Empire Estates, Earlington Golf
Course (proposed to be developed as a manufacturing park) , Earlington
Woods P.U.D. and motorists on Monster Road.
•
96
Y The Institute for Environmental Studies' Office of Public Archaeology
at the University of Washington has conducted a preliminary assessment
of the potential archaeological significance of the subject site. A
letter indicating its findings and recommendations has been included
1 in Appendix D, p. D-2 of this document. It is suggested that a
subsurface coring program be implemented at intervals of 25 meters in
Il • those areas that are- judged to have high archaeological potential and
at 50 meter intervals in other disturbed areas. Thus, coring would .
11 not be conducted along the old Columbia and Puget Sound Railroad grade
bisecting the site from east to west, the present railroad tracks at
the northern boundary of the property and in the channel of the old
Black River.
_
i/K caexS tkPejoemeA2010 ! St 7 S
p®lta tal $18.1,aNc c-e) specs < " �� �� a"vdie,,, sods.
4y. 'rior to the commencement of construction activities, the proponent
will authorize implementation of a coring program as suggested by the
. Office of Public Archaeology.
Al
1•
Mitigating Measures
Any portion of the site which may be determined to have archaeological
tri significance could be retained in open space until excavation can be
• completed.
Unavoidable Adverse Impact
• Potential removal of an archaeological site.
•
11 11. Economics
Existing Conditions
The site of the proposed • action is located within the Seattle
metropolitan area which is currently experiencing ubstantial -economic --
growth. The lower Green-Duwamish River Valley is evolving as an
industrial-distribution center and has long served as a transportation
ux center.. •
A representative of Coldwell Banker, Cozmmercial Real Estate Services
11 has provided an informational letter which has been incliidPd as page
D-6 of Appendix D. --
1.
It states that presently there exist 32-million square feet (s.f.) of
- 97 — -;1
industrial space in Renton-Tukwila-Kent area.- Of this space, approx- I
imately 1 million s.f. is vacant, which represents a vacancy factor of
37o. (About 485,000 s.f. of this total vacant space was constructed
during 1980.) At the present rate of absorption of 200,000 s.f. per
month, the existing inventory of vacant industrial space would be oc-
cupied in five months.
. i
4\--.
/ It is acknowledged that industrial real estate conditions may alter con-
siderably prior to the time the Black River Office Park is scheduled for 1
completion. However, the proposed site would be attractive to tenants
needing rail access because it is one of two sites in the Valley equip-
//
/ ped with reciprocal switching from both Burlington-Northern and Union
t Pacific without penalty to the shipper, except on very short, local
i hauls.
i
1' Impacts 1
The project would create short-term construction employment. The
development would also partially ease the demand for industrial 1
I
1 buildings space. The City of Renton will receive an increase in tax
revenues and municipal costs generated from the project.
• \
Mitigating Measures
None, •
Unavoidable Adverse Impacts
Unknown.
p ,1 if_, cui ofk4344,„,e4)44.„, i'LL iti 4.!.',112.4. 4 L•41,'
144.,,t a , ,411
\\\\
-;tr.-- '23 v7v _ -2-fek;)----13faci,e.. fe:-.4.v.e.A. Ogie..e. - 4,,, .. _._
cimi.44,2:04+ etr.., .A.,, Agjetit,Ciletfa4,4,
1
n A.
1
1
i
104 •
SECTION EIGHT
MITIGATING MEASURES
The Physical Elements of the Environment
Earth
- Excavation and grading operations on the site will be performed in
conformance with the City of Renton Mining, Excavation and Grading
Ordinance. -
- Topographic changes could be restricted to limited portions of the site.
Unique Physical Features
- Existing vegetation will be preserved on significant portions of the site.
- A master landscape plan will be prepared to ensure good design practice
and preservation of as much of the riparian vegetation as possible.
- As many of the existing trees as possible should be retained through
maintenance of greenbelt areas in order that the large groups- of trees
sW and understory remain undisturbed. •
9Catch basins and screens should be included in the stormwater system to
'' collect litter and debris.
- No development will occur within a 50 foot setback from the tops of the v
. bank of the Black River Channel .
- Fill material will be required to bring some building site's above the 100
year flood plain.
- Some areas could be left unfilled which may reduce the amount of flood
storage displacement that occurs on the site.
Air
Low emission construction equipment will be used whenever possible.
1 - Measures to control construction dust, such as watering, cleaning and
rF_ -
107
- Parking area lighting could be directed so that no direct light spills
off the site.
Land Use
- An alternative development design with limited building area could retain
significant areas of the site in open space.
Natural Resources
r - Building elements could be analyzed for use of techniques, wherever
possible, permitting recovery of materials used in construction.
The Social Elements of the Environment •
Transportation/Circulation
.mil tease--re ar toi a r8 - h e v.e
7`
Fire Service
- Sprinkler systems installed in buildings per City Code and Fire
Marshall 's requirements will reduce the amount of fire flow required.
- Non combustible building materials would reduce risks of fire.
- Industrial tenants could be limited to uses that do not utilize any
flamable materials.
Police Services
- Tax revenues generated from the development will help offset the cost of .
additional service.
P 109
L....AL.. ca.I/a -Air 11-4- .
SECTION NINE
ALTERNATIVES
J. No Development
Description
This alternative would leave the site in its undeveloped state on a
permanent basis or on a temporary basis until some other proposal for
development is approved by the City.
Impacts
All adverse environmental impacts of the project would be eliminated.
The positive economic benefits of the project are increased property
taxes, creation of short and long-term employment and partial alleviation
in vacant industrial land demand. Municipal services ed9 capital costs
would not be incurred. The most significant impact •of this alternative
would be preservation of the riparian forest. This ,would extend the
opportunity for the City to purchase the site and preserve it as a green
belt. However, no development would shift the impacts of development to
other sites which could be more or less suited for these uses.
•
However, pressure to develop would continue due to Manufacturing Park
designation on the Comprehensive Plan, development of the surrounding
properties and, increasing demand for industrial land development.
Feasibility
The "no development" alternative would not meet the objectives of the
proponents. The feasibility of the City acquiring the site for the
purpose of preservation is unknown, but the market value of property is
- - -high and the City' s Comprehensive Plan designates the site for
manufacturing park use.
110
t of 7g% ®
Development •
Description
•
Alternative 1 - Development of 75% of the site with 25% in concentrated
open space. fier.QS
Site Coverage Mk'-' L1j.Q.
Use Acreage Percentage
tv
Warehouse 13. , 19% e.j d Ike-
Office 37.0 50%
Roads 2.85 4% ° .
Open Space . • '17.79 r: 25% `� '
oot
-riAyyjoidA.
Impacts dayAr,,
This alternative would leave approximately 25% of the site in open space. 00
The impacts of this development would be proportionately greater than the , \ 0 00
proposed although this difference is not quantifiable. However, impacts
of this alternative would be greater in the following elements: soils, '`''; ,
12V74:
topography, erosion, air quality, runoff, flora, fauna, noise, light and b '� �
glare, natural resources, employment, transportation/circulation, public z` `; '
services, energy, utilities, aesthetics, and economic factors. When
definite site plans become available for review, specific differences in /°'
impacts can be assessed.
Feasibility
Economically, this .alternative is desirable to the proponent. However,
the increased impacts caused by an increase in density would reduce.
feasibility in regard to service from city and public utilities, as well
as diminishing the acceptability of project development with respect to '
the physical environment (soil , topography, runoff.-patterns , flora
fauna, light and glare, noise levels and natural resources.)
. ..
111
Concentrated Development
Description
Development of 50% T acres) of the site with 35+ acres remaining in
open space.
• Site Coverage
Percentage
Use Acreage (of 33 acres)
Warehouse 5.86 16%
Office 16.62 50%
Roads .33 1%
Open Space 11.0 33%
(About 4.5 acres of the to-be-developed half of the site is presently
cleared. 28.5 acres of this one-half is comprised. of riparian forest.
38% (or 11 acres) of this riparian forest would be retained on the
developed half of the site and 72% of the riparian forest would be
retained over the entire site.)
Impacts
dverall , this alternative would place decreased demand on the physical
environment. Specifically, no development would take place in the
eastern portion of the site. This area would be preserved as open space
which would eliminate the impacts on soils, topography, runoff patterns,
4(19;)1\(11flora, fauna, light and glare, noise levels and natural resources for
tthat area. Impacts to the physical environment in the developed areas
It hat P Y P
bpra(31./ tit would be comparable to those of the proposed project.
%
Impacts to the human environment (public services, utilities, energy and
archaeological resources) would be nearly the same as under the proposed
project. However, elements such as transportation/circulation, air
quality, noise and employment impacts would be diminished.
Feasibility
This alternative would reduce the amount of leasable building space by an
undetermined amount. Further, there is a high demand for rail-served
warehousing which may not be fully utilized if the project were to
exclude this use. For those reasons, the proponent considers this
' . alternative economically infeasible.
I
' llla lif eI pane-. I, , ' ;
I:1
fl �S4, SWt
TABLE ..10 S _e - te% 1
Comparative Analyses of Alternatives ,,,,
°�1' ' A & zl'A,41 . 41I
Proposed Action : '
Site ' • er. se !;I-,.
Use Acreage '-r, ent. •e
H .4 2,16 i
Warehouse 12.09 17'. ,;i.
Office 35.58 58% �� gA i'"I'
Roads 2.85 '�� �. I!:;,
Total developed 50.52 / 1'• li;i,;/
Open Space 20 —) , 29% v, ial4 , .
/
(Approximate) 35% f the riparian forest /
_� • �f '
would remain g development.)
f
Alternative 1 - Development of 75% of the it with 25%wi 25% in concentrated open
1.
space. I',.
i Site coverage I ` '
Use Acreage ! Percentage
Warehouse - 13.5 / 19%
Office 37.0 / 50%
Roads / 4% ';i.•
Open Space 17.79 / 25% :i 'a
n1
Alternative 2 - Development of 50% (33 a res) of the site with 38 acres ,`.:j
remaining in open space Site coverage !
Use Acreage Percentage ( of 33 acres) :"I
arehouse 5.86 16% ,,
Office 16.62 50%
Roads 1%
Open Space .0 l 33%
(About 4.5 acres of the o-be-developed half of the site is presently I!
cleared. 28.5 acres of this one-half is comprised of riparian forest. ;;j
38% (or 11 acres) of this riparian forest would be retained on the ''
developed half of the site and 72% of the riparian forest would be ''
retained over the entire site.
'I
Alternative 3 - No Action ;,,I
Site Coverage , 1.
Use Acreage Percentage
Un3eveloped open space 71.16 100%
(11.5 acres of the site are presently cleared. About 59.5 acres of the
site are presently comprised of riparian forest.) :.'1
r• ,
' /- ' . -
OF R''4,,
.�� . . a THE CITY OF RENTONT
U tt ram; ..r MUNICIPAL BUILDING 200 MILL AVE.SO. .RENTON,WASH.98055
Z.o soli .. ' :.. a BARBARA Y. SHINPOCH. MAYOR • PLANNING DEPARTMENT
09.0 co. 235- 2550
094
TE0 sEPT°MO
June 15, 1981
Deborah Krouse
R. W. Thorpe & Associates
815 Seattle Tower
3rd & University
Seattle, Washington 98101
RE: Black River Office Park EIS
Dear Deborah: .
As I discussed with you on the telephone, I am forwarding a copy
of a response we received from the Washington Department of Game.
Even though this response is late, let us include it in the Final
. EIS. I believe you will be able to handle it by referring, to
answers to other letters. The issues of water quality in the
wetlands and wildlife habitat which it raises are raised in other
letters we received.
If, however, you think that this letter will require significant
work or additional information, please contact Dave Clemens or
myself and we will discuss the possibility of excluding it from
the Final EIS.
Sincerely,
4tt. t -
Gene N. Williams '
Assistant Planner -.• -
GNW:gh
V
OF R4,
•
THE CITY OF RENTON
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH.98055
0 • BARBARA Y. SHINPOCH, MAYOR ® PLANNING DEPARTMENT
°90 co- 235— 2550
9,4TFD SEP c ���P
June 8, 1981
Deborah Krouse
R. W. Thorpe Associates
815 Seattle Tower
Seattle, Washington 98101
RE: BLACK RIVER EIS COMMENTS
Dear Deborah:
The Environmental Review Committee has reviewed the comments
obtained from the above-referenced EIS. Based upon these
comments, the following items appear to require a significant
additional study:
1 . Prior to issuance of the Final EIS, a coring program
for archaeological sites should be completed (see
the comment from the Duwamish Indians) .
2. Ability of ,the Black River channel to handle runoff
from this project in light of Earlington Park and
other developments in the vicinity while maintaining
a "wetland treatment. "
3. An operational traffic analysis of key intersections
and arterial links in the vicinity of this site
considering both this project and other anticipated
developments within the immediate vicinity. This
analysis should compare the effects of the 9,000
trip development versus a 34 , 000 trip development.
Further, could all or a portion of the development
function without the westerly access?
4 . Considering the traffic analysis in the above item,
an air quality modeling for the two levels of traffic.
5. Consideration of an additional alternative or expansion
of the no-action alternative to consider developing
Deborah Krouse
R. W. Thorpe Associates
June 8, 1981
Page Two
the office park at some other location in the Green
River Valley.
Attached are copies ofall the responses received on this
EIS. If you have any questions , please feel free to contact
me at y u ' earliest convenience.
Very my yours,
For dHz
"iEnvironmental Review Committee
David Clemens
Acting Planning Director
DRC:wr
cc: Alterra Corporation
Attention: Del Bonds
Enclosures
MEMORANDUM
DATE: May 11, 1981
'TO: Dick Houghton, acting Public Works Director
FROM: Gary Norris, Traffic Engineer
SUBJECT: Draft EIS -- Black River Office Park
Pursuant to your request, I have reviewed the subject EIS and am concerned about
the following issues:
1. The subject development is proposing traffic volumes in the
neighborhood of 10 - 35,000 vehicles per day. However, they
have done nothing to identify the impacts on the surrounding
street network. Therefore, the following information should
be submitted before an evaluation can be made:
A. Existing Conditions
1. Average Weekday Traffic Volumes (AWDT)
2. Peak Hour Turning Movements at critical intersections
a) a.m. peak hour counts
b) p.m. peak hour counts
3. Operational Capacity Analysis for peak hours
B. Future Conditions
1. With development
a) With proposed Valley Parkway
1) AWDT
2) Peak hour turning movements at critical intersections
for a.m. and p.m. peak hour counts
3) Operational capacity analysis for peak hours
b) Without proposed Valley Parkway
1) AWDT
Dick Houghton
Page 2
May 11, 1981
2) Peak hour turning movements at critical inter-
sections for a.m. and p.m. peak hour counts
3) Operational capacity analysis for peak hours
2. Without development
a) With proposed Valley Parkway
1) AWDT
2) Peak hour turning movements at critical inter-
sections for a.m. and p.m. peak hour counts
3) Operational capacity analysis for peak hours
b) Without proposed Valley Parkway
1) AWDT
2) Peak hour turning movements at critical inter-
sections for a.m. and p.m. peak hour counts
3) Operational capability analysis for peak hours
The analysis should include the impact for all scenarios that are
being contemplated. For the purposes of this analysis we consider
the following intersections to be critical:
1. Rainier Ave. South and SW 7th Street
2. Rainier Ave. South and Grady Way
3. Grady Way and Powell Ave. SW
4. Grady Way and Valley Parkway
5. Valley Parkway and SW 7th Street (extension)
6. Valley Parkway and westerly access road
7. Valley Parkway and Empire Way
8. Proposed roadway intersection with SW 7th Street
The attached map identifies locations where we desire more information.
2. The various future scenarios analysis should include the impact of
surrounding development, i.e. Earlington Woods, Earlington Park as
well as background traffic growth.
3. What type of impact would the reduction of parking stalls have on
single occupant vehicles accessing the site?
%,
Dick Houghton
Page 3
May 11, 1981
4. To what extent is the proposed development willing to participate
in the construction of the proposed Valley Parkway?
5. Has developer discussed the possibility of another transit route
with Metro?
6. Is the developer willing to covenant the property to provide
on-going bus passes?
7. Developer should contact Commuter Pool and establish a program of
flextime, carpooling and vanpooling.
GAN:ad
Attachment
pc, •- ...
•
.‘Isi ..;,-.........1"...............„.....:,........r......___
de) 'a' ti S
511. 9ov r !;.
...".."...%%4N4%44:1,
a i TE &
r(•rN 4, t,. *1 t4, S W I TO _
IA
0 1\ It t ___.,.....-10 Aoil 1-4'
� �� g(41111111147iL 7
a
op,
3
14
ac
as
N
13
W k
ti
k
o
..4z -
1
V'-• r:: : .+ft ti4
BL A CJ< R1 V E PR
,, OFFICE PA RK
R. W. THORPE & ASSOCIATES
815 Seattle Tower•3rd & University•Seattle, Washington 98101 •(206)624-6239
Suite 503 • 1110 West Sixth Avenue • Anchorage, Alaska 99503 • (907) 276-6846
TO DATE December 12, 1980
Dave Clemens
Renton Planning Staff SUBJECT Black River Industrial Park/
Archaeology
Dear Dave:
Enclosed please find a copy of the preliminary findings of the Office of Public
Archaeology regarding the subject Black River Industrial Park site.
In it, Mr. Kennedy suggests that a systematic coring of portions of the site be con-
ducted. I presume that such archaeological testing would be performed following
the rezone action and prior to issuance of the Draft EIS of the proposed industrial
park.
Please call me if you feel it necessary to discuss this matter further.
Your very truly, 1513
it/(\
Deborah Krouse U 1KJ
encl: Preliminary Findings of Office of Public Archaeology 4 /1
DK/mlv N/U� DE��
LNG f
4 I i .
I AFFIDAVIT
y, \NJ.°i -4 i gpcv 6 , being duly sworn, declare that I
S
am the owner of the property involved in this application and that the
foregoing statements and answers herein contained and the information
herewith submitted are in all respects true and correct to the best of
my knowledge and belief.
Subscribed and sworn before me • .
this // ay of 414-de-,...k.e.2_119cF0 ,
Notary Public in and for the State of
Washington, residing atea-C,-,,,_,
(7)et-e--e----el
me of Notary. Public) 'Signature of Owner
'en;70.-e ; 71_Ze..e a_,.. _S. •
•p a ,, i)ov . (4)(. , co ( .
(Address) (Address)
S-,26/21/4(17-& (j1(.." c
(City) ( (State)
(_ 44 - r'1(51° (
(Telephone)
(FOR vy r.cub USE ONLY)
CERTIFICATION
This is to certify that the foregoing application has been inspected by me
and has been found to be thorough and complete in every particular and to
conform to the rules and regulations of the Renton Planning Department
governing the filing of such application .
Date Received , 19 By:
•
•
Renton Planning Dept .
2-73
Law Offices %• t 1,
• NEUBAUER and MUSSEHL ; , = ��,A
The Duncan Building 1� ,
315 Second Avenue South 0Lta
Seattle, Washington 98104
(206) 622-7050 `
RONALD G.NEUBAUER,P.S.
ROBERT C.MUSSEHL March 16, 19 81 .4 A, J l G n '
MORRIS H.ROSENBERG
MICHAEL D.HUNSINGER
DAVID M.ABERCROMBIE*
Of Counsel
JOHN W.FLYNN
JEFFREY MICHAEL GRIEFF
Mr. David Clemens
City of Renton Planning Department
Municipal Building
200 Mill Avenue South
Renton, Washington 98055
Re: Black River Riparian Forest
Dear Mr. Clemens:
This office represents JAG-Renton Associates , Renton
Property Associates, and John R. Hansen. They own
approximately 71 acres of real property adjacent to the
Earlington Golf Course in Renton.
My clients purchased 46 acres of this property in 1979,
and an additional 25 acres in 1980. The reason my clients
purchased the property was that in 1976 the City of Renton
passed a comprehensive plan which designated this property
for use as a manufacturing park. During the last two and
one-half years , my clients have been continually dealing with
the City of Renton regarding the development of the property
and seeking zoning classification for a manufacturing park.
For example:
1. In September of 1979, Mr. Hansen filed his original
application with the City of Renton for classification as a
manufacturing park with respect to the original 46 acres;
2. In January of 1980, Mr. Hansen submitted the
preliminary environmental impact statement with respect to
the same;
3. In October of 1980, my clients requested and secured
the City' s permission for R. W. Thorpe & Associates to
•
* Licensed to practice in Washington and Hawaii • Hawaii Bar No.2379
111
Mr. David Clemens -2- March 16, 1981
prepare the environmental impact statement with respect to
the development of the entire tract as a manufacturing park;
4. On October 24, 1980, my clients deposited $7,500 to
the City as partial payment for the preliminary environmental
impact statement;
5. On November 7 , 1980, my clients filed the preliminary
environmental impact statement with the City of Renton.
Throughout that period of time, my clients have dealt in
good faith with the City of Renton, and have always believed
that the City has dealt in good faith with them. My clients
have spent in excess of $20,000 to survey the property.
Furthermore:
1. They have arranged the location of utility service to
the property and prepared preliminary designs for road access
and a storm sewer system.
2. They have been involved in lengthy and extensive
negotiations with King County and Metro regarding the
location of the pump station adjacent to the property, and
the creation of a rentention pond adjacent thereto.
3. They have negotiated with Milwaukee Railroad
regarding road access to the site, and Burlington Northern
with respect to railroad trackage.
4. They have negotiated with the City through First City
Equities Corp. for the provision of sewer, water, and power
to the site.
5. They have negotiated with the City through CHG
International Corporation to resolve drainage problems on the
site.
6. They have spent many hours with the Hydraulics
Department of the City with respect to the site.
Mr. David Clemens -3- March 16, 1981
7. They have spent almost $25,000 for the preparation of
an environmental impact statement, which is virtually
completed and is enclosed with this letter. This letter and
the environmental impact statement constitute filing of said
statement with the City of Renton.
8. My clients have dealt not only with the above
agencies, but also the University of Washington, the
Washington State Department of Ecology, and the Washington
State Department of Natural Resources, regarding not only the
above problems but also the aspects of land use.
During this process of negotiations , my clients have been
willing to make several concessions in order to obtain zoning
classification consistent with the Comprehensive Plan. For
example, they have discussed with the City the possibility of
providing a green belt along the old Black River and Spring
Brook. They have also agreed to permit seven acres to be
used by King County for a retention pond, that would serve
the entire Kent Valley. They have also arranged to install
roads, utilities , and rail access to the site, which would
benefit the entire community.
Obviously, my clients have gone through this entire
process on the assumption that the City of Renton would
fairly and openly consider their request for a zoning
classification that would merely comply with the City of
Renton' s own Comprehensive Plan. Throughout the entire
thirty-month process , my clients have been led to believe by
a number of various city officials that such a full and fair
consideration of the application would be made.
All of a sudden, without any notice or warning to my
clients, on March 3, 1981, the City of Renton published a
•
Mr. David Clemens -4- March 16, 1981
document entitled "City of Renton Wetlands Study. " The
report indicated that it was financed by an 1978 federal
grant. Among other things, the study designates the area
owned by my clients as a proposed "Black River Riparian
Forest. " This recommendation is, made despite acknowledging
the fact that as recently as 1976 the City of Renton adopted
a Comprehensive Plan designating the same area for use as a
manufacturing park. The report furthermore acknowledges that
only a portion of the "Forest" qualifies as "wetlands" under
the Washington State Shorelines Managment Act.
This Study furthermore recommends that the City of Renton
"should investigate the purchase of the entire 65 to 70 acre
habitat for a wildlife/recreation area. . . . " This
recommendation is made despite the fact that the study was
commissioned three years ago, my clients have been involved
in the purchase and attempted development of the property for
at least the last two years , and have never been informed as
to the possibility of this recommendation being made. In
fact, the field notes attached as Appendix 1 to the Study are
all dated November 7, 1980, more than two years after the
report was commissioned.
My clients are obviously surprised and somewhat amazed at
the publication of this new study, because of the facts cited
above. They are also obviously unwilling to permit their
property - which the City of Renton currently has designated
for use as a manufacturing park - to be preserved in its
natural environment. Because of the enormous investment
already made by my clients in the property based upon
representations made by the City through its Comprehensive
Plan and through contacts with City officials, my clients
cannot afford to delay their efforts in obtaining the zoning
reclassification.
However, my clients do want to give the City of Renton an
opportunity to express its intent to purchase the property
herein involved, at its fair market value, before they invest
additional time and money in seeking to obtain the zoning
classification for the use of the property as a manufacturing
park. The fair market value of the real property owned by my
clients, for the use designated in the City of Renton
•
411
Mr. David Clemens -5- March 16, 1981
Comprehensive Plan is $2. 25 per square foot. There are three
million square feet involved: the fair market value of the
real property therefore is a total of $6. 75 million. We
thereby give the City of Renton an opportunity to declare its
intent to purchase the real property owned by my clients for
$6.75 million by March 24, 1981. At this point, my clients
are obviously not insisting upon receiving the funds from the
City. However, this timetable provides the City with
sufficient time to determine whether or not it seriously
intends to purchase my clients ' real property at its fair
market value.
I would appreciate receiving a written response to this
letter, expressing the City 's intent with respect to the
above by March 24, 1981. I would also be willing to discuss
the matter further with the City of Renton in the interim.
Should we not receive notification from the City that it
does intend to purchase the property for the price mentioned
above, we request the City to immediately complete its review
of our application for designation of the property as a
manufacturing park, and pass an ordinance so authorizing its
use consistent with the City of Renton Comprehensive Plan.
I look forward to hearing from you.
Very truly yours ,
MICHAEL D. HUNSI ER
MDH:RH
OF fit
— THE CITY OF RENTON
`® `d0 MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH.98055
n ; BARBARA Y. SHINPOCH, MAYOR ® PLANNING DEPARTMENT
235- 2550
°'9gTE0 SEPS��O�P March' 31 , 1981
fRANDUM
ANDU
TO : Deborah Krause, R.W.Thorpe, Assoc .
FROM: David R. Clemens , Acting Planning Director
RE : BLACK RIVER INDUSTRIAL PARK EIS - Draft
Attached are copies of our correspondence of December 30
related to the alternatives section of the EIS . If you will
include a language discussion on the order of the language
discussion found in the Summary section of the EIS, we will
be prepared to go to print. Also, the Tables in the
Alternatives section should be revised to reflect the difference
between the riparian forest and other open space left on the
site .
Gary Norris has reviewed the traffic sections and finds them.
addequate for this level of EIS . At such time as the draft
on the site specific EIS is prepared, the traffic analysis
should be operationally specific for all intersections within
the area shown on the attached map .
Gene will discuss with you the minor language corrections
within the draft as soon as complete, and probably today
or tommorrow.
DRC :dc
A.. a,, re., 0
`� THE CITY OF RENTON
�tIB k
MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.98055
z BARBARA Y. SHINPOCH. MAYOR O PLANNING DEPARTMENT
?,,3 t' 235- 2550
O,A"ZO SEP1°\t'r°
April 1, 1981
Deborah Krouse
R.W. Thorpe and Associates
815 Seattle Tower '
3rd & University
Seattle, Washington 98101
RE : DRAFT EIS FOR BLACK RIVER OFFICE PARK
Dear Deborah :
Please find enclosed a copy of the March 23 , 1981 ,
Draft EIS , which contains specific comments reflecting
the changes we discussed by phone and the modifications
noted in Dave Clemens ' memo of March 31 . I 'm sure that
many of the minor changes you have already caught your-
self. When the appropriate corrections have been made,
we will be able to authorize publication of the Draft.
Very truly yours,
4 hr td d e?,: ie
Gene N . Williams
Assistant Planner
GNW:wr
Enclosure
1
,/
.- •
®� _ r: o THE CITY OF RENTON
U ®� .z r" MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,MASH.98055
0 oanew , BARBARA Y. SHINPOCH. MAYOR 0 PLANNING DEPARTMENT
.51 co• 235— 2550
0,9gT�D SEP1.
CONFIDENTIAL
M
March 27 , 1981
ME
u' AN ;Up
TO: Richard btredicke
City Council President
FROM: David R. Clemens
Acting Planning Director
RE: BLACK .RIVER RIPARIAN FOREST
The following is a brief response to the letter from the
offices of Neubauer and Mussehl regarding the application
and property contained within the Black River Riparian Forest.
Mr. Hunsinger correctly states in his letter that Mr. John
R. Hansen did submit a rezone application in September of
1979. Comment #2 regarding the submission of an environmental
impact statement in January of 1980 is incorrect. What was
submitted was an expanded environmental checklist, which
dealt with a number of issues which were inadequately presented
in the original rezone application submission. Mr. Ericksen' s
memorandum of August 7 , 1980, (copy attached) describes the
meetings and correspondence which occurred between January
and July of 1980.
Between April. and October of 1980, this office met with and
discussed with the applicant the process for obtaining consul-
tants for preparing the environmental impact statement, and
on October 15 , 1980, this department did approve R. W. Thorpe
Associates to prepare the environmental impact statement
and set the cost of the preparation of that draft at $7500. 00 L A
per the scope of work presented by Thorpe and Associates. 6/ �/ ?46�D�7/�
On November 19th, the City received a preliminary draft of
the EIS and comments on that preliminary draft were returned
to the consultant on December 30th. On January 22nd, a meeting
was held between this department and the consultant to discuss
the issues surrounding the comments transmitted on December
30. Finally, on March 16th, Mr. Hunsinger' s letter transmitted
"proof" drafts of the impact statement for our final review.
That review process should be completed by early next week.
Richard Stredicke
March 27, 1981
Page Two
On page three, item #7, Mr. Hunsinger states that $25,000
was expended in the preparation of the environmental impact
statement. This cost apparently includes expenditures for
purposes other than the EIS in that the fee established for
preparation of the draft is $7500, which is being maintained
in an escrow account by the City. Other costs such as engi-
neering and design consulting time may have contributed to
the $25,000 figure listed in item #7.
This department has maintained from the commencement of this
project, and has included in numerous pieces of our corres-
pondence, that this proposal to rezone the Black River Forest
for industrial park uses may not be feasible due to environmental
considerations. The Wetland Study alluded to in Mr. Hunsinger ' s
letter was simply the culmination of an effort to establish
the relative quality of wetland areas within the City. Although
this report was unavailable to the EIS consultant, when this
department met with his staff on January 22, 1981 , we did
discuss a number of the details of that report as it related
to the Black River Forest. I , therefore, question Mr. Hun-
singer' s comment that "without any notice or warning to my
clients , " the City published the Wetland Study. The future
use and protection of the Black River Riparian Forest has
been the key issue throughout the discussions with the propo
nents of this rezone application. The implication contained
in this letter that the City withheld information from the
proponents is totally erroneous.
DRC:wr
Attachment
I
Law Offices
NEUBAUER and MUSSEHL
The Duncan Building
315 Second Avenue South
Seattle, Washington 98104
(206) 622-7050
RONALD G.NEUBAUER,P.S.
ROBERT C.MUSSEHL
MORRIS H.ROSENBERG
MICHAEL D.HUNSINGER March 26 , 1981
DAVID M.ABERCROMBIE*
Of Counsel
JOHN W.FLYNN
JEFFREY MICHAEL GRIEFF
•r
Mr. David R. Clemens RIf� N
Acting Planning Director y The City of Renton RO'PlFb
; %
Municipal Building
200 Mill Avenue South wit27 1981
Renton, Washington 98055 •
•
Re : Black River Riparian Forest e ..
��
Dear Mr. Clemens :
Thank you very much for your letter of March 19th,
in response to my letter of March 16 , 1981 regarding the
above property.
As you know, my clients presented an environmental
impact statement with respect to the above property last
week. I am very pleased that your office will process it
based upon its own merits and the policies and regulations
of the City of Renton that are currently in effect. My
clients are very anxious to proceed with development of the
property pursuant to the City of Renton Comprehensive Plan,
, and their environmental impact statement reflects the
desirability and feasibility of such a project.
I am most willing to assist you in any conceivable way
throughout your hopefully expeditious review of the
environmental impact statement.
I will be keeping in touch with you on a regular basis
as you review the proposal and I hope and expect you will do
the same with me.
•
Once again, thank you for your letter. •
Very truly yours ,
MICHAEL D. HUNSIN R
MDH: jh
cc: Delton Bonds
John R. Hanson
Kenneth Thompson
* Licensed to practice in Washington and Hawaii • Hawaii Bar No.2379
11
f .
OF I
A
-w.. o THE CITY OF RENTON
. •.! M..: • MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH. 98055
z ..u. .- o
n am= BARBARA Y. SHINPOCH, MAYOR a PLANNING DEPARTMENT
°94. co- 235- 2550
0,9'7. 0Er0-1°
s �Q
'March 19, 1981
Mr. Michael D . Hunsinger
Neubauer & Mussehl
The Duncan . Building
315 Second Avenue South
Seattle , Washington 98104
RE : Black River Riparian Forest
Dear Mr . Hunsinger :
I am in receipt of your letter of March 16, 1981, regarding the
above property . As you are aware , the City of Renton is in the
early stages of possibly developing a policy relating to wetland
use for urban development . Until such time as the City Council
adopts such a policy and specific recommendations regarding
individual properties , we are unable to consider your offer of
purchase of the subject property.
As within the application submitted to this office, we will be
processing it based upon its own merits , and the policies and
regulations of the City of Renton which affect the proposal at
the time that it is submitted. Upon completion of review of
the draft impact statement , we will be able to more nearly
clarify the timing of public hearings related to this proposal .
If I can be of further assistance to you with regards to this
matter, please feel free to contact me at your earliest
convenience.
Verytruly you ,
Af
C.a/4e'
v 1 mens
Acting Planning Director
DRC :gh
cc : Mayor Shinpoch .
City Attorney
OF Rv
�a, o THE CITY OF RENTON
U `� MUNICIPAL BUI LDING 200 MILL AVE. SO. RENTON,WASH. 98055
o
BARBARA Y. SHINPOCH, MAYOR • PLANNING DEPARTMENT
9 co- 235- 2550
0,9q��0 SEPTE���P
MEMORANDUM
March 19 , 1981
TO : Public Works Director
Building Director
Police Chief (1\1_1
Fire Chief
FROM : David R . Clemens
Acting Planning Director
Attached is a transmittal letter from R . W. Thorpe & Associates
related to the Black River Industrial Park draft Environmental
Impact Statement (EIS ) . We have also attached a copy of the
EIS for your review. This is the second-round review on this
draft , and it is assumed that the consultant has incorporated
all of the comments which you previously made on this report .
If you would like to review your previous comments , please con-
tact this office so that we may provide them to you .
Since the Police and Fire Departments ' sections of this report
are relatively small , I have attached one copy to be reviewed
by the Police Department and then forwarded to the Fire Depart-
ment with your comments being returned to this office .
We would appreciate any comments on this report to be returned
to this office as soon as possible but not later than Friday ,
March 27 , 1981 . If you have problems meeting this deadline ,
please contact me immediately to consider alternative courses
of action .
Thank you .
R.W. Thorpe & Associates
Planning • Environmental Analysis • Economics
Associates:
• Len Zickler
I1 Deborah Krouse
March 17, 1981 1V31
I-
Mr. David Clemens ;` . A
Renton Planning Department
Municipal Building ',•�ING•
200 Mill Street
Renton, WA 98055
•
Dear David:
I am pleased to forward to you four (4) copies of the revised draft
of the Black River -Office Park Draft EIS for your review, as you
requested.
You will note that the traffic discussion will be forthcoming and it
will take the form of a letter from the TRANSPO Group elaborating on
the projected traffic volumes and significant points of congestion
anticipated in conne:ctiorJwith the proposed action. It will be sub-
mitted to you as soon as it becomes available.
I understand that you would,prefer the EIS to indicate which of the
mitigations will be implemented by the developer; however, in dis-
cussions with several individuals, I have concluded that such commit-
ment by the developer is premature and inappropriate during the rezone
phase of this EIS process. Upon finalization of site plans and ap-::
proval of the rezone, mitigations to be implemented by the developer
would be so indicated in any subsequent environmental review docu-
ments.
If you have any questions, please do not hesitate to call me at
624-6239. I look forward to hearing from you as soon as your review
has been completed.
Yours very truly,
Deborah Krous , APA
•
Seattle: 815 Seattle Tower• 3rd& University• Seattle, WA 98101 •(206) 524-6239
Anchorage: Suite 503• 1 1 1 0 West Sixth Avenue•Anchorage,AK 99503•(907) 276-6846
c
z
A.
4 O THE CITY OF RENTON
c.— ®® z MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.98055
471cm. ;
BARBARA Y. SHINPOCH, MAYOR so PLANNING DEPARTMENT
09,� Q3• January 14 , 1981 235- 2550
09g7-&0 SEP-cs
•
R.W. Thorpe & Associates
ATTN: Jon Potter
815 Seattle Tower Building
. 3rd & University
Seattle, Washington 98101
RE: BLACK RIVER INDUSTRIAL PARK REZONE EIS
Dear Mr. Potter:
We have completed our review of the preliminary drafts submitted
to this office, and we have no substantative changes from
our previous correspondence, and marked-up copy of the draft.
Attached for your consideration is a memorandum from the
Police Department regarding various aspects of the impact
statement.
One of the significant areas of concern in the EIS involves
the dicussion of the relationship of the proposal to existing
plans and policies. Although not currently adopted, the
policy element of the Comprehensive Plan has been recommended
to the Council, and the Planning Development Committe will
commence its deliberations this week. We expect final adoption
by the Council within the next few weeks . It should be noted
that the Environmental goal discusses in detail the preser-
vation of natural resources , wildlife habitat, and wetland
areas. Upon adoption, these policy criteria will be considered
by the Hearing Examiner in his review of the rezone proposal
for the site. We will keep you informed as to the progress
of the policy element, and have attached a copy for your
consideration.
At such time as the corrections noted in the previous draft
and comments from other departments have been corrected we
will be happy to further review this EIS. Should you have
any questions, please feel free to contact myself or Gene
Williams at your convenience.
Vy //
er. truly .y ,
C.'
atzti-a
avi Cl ens, Acting
Planner Director
DRC :yb
cc : Gene Williams
/ . .
ME '; 0 RA N '. 'iUM •
TO DAVE CLEMENS, Sr. Planner DATE 12/10/80
FROM Lt. D.R. Persson
SUBJECT Black River Industrial Park
After reviewing the draft E. I .S . on this particular project I have the
following areas of concern.
(1) Traffic access to the area. I do not believe that the roadway
system should be built in stages. The present roads into the area
cannot handle the increased traffic that the proposed development
will generate without additional access points. Thus, the entire
roadway system should be developed prior to any building in the
area so that the road system is connected at Monster Rd. and Longacres
Parkway. By completing the roadway system prior to construction, the
traffic impact of this project will be minimized. Also, the development
should assist in the installation of a traffic signal at Hardie SW
and SW 7th prior to any road construction as this particular area
is extremely overcrowded with traffic congestion at the present time
and cannot handle even the added traffic that the road construction
would create.
(2) Light glare from the proposed buildings. This type of complex creates
extra patrol work for the police officers on the street due to the
necessity of checking the buildings during the hours of darkness.
The police officer ' s job is made easier and safer by placing the
outside lighting on the fringes of the property so that the light
shines in on the building. This allows more safety to the. officer as
he is not blinded by lights that are shining off cf the building
when responding to calls late at night or while merely checking the
building.
(3) Railroad crossings. The railroad crossings in the area should be
the new style rubberized railroad crossings so as to prevent excess
noise and also to make it easier to maintain safe crossings in the
future. In the past we have found that railroad crossings were installed
that become in disrepair after a year or two and when big trucks
cross over these crossings late at night, a large amount of noise is
generated that can be heard in surrounding residential areas on
Earlington Hill.
If the above three conditions are met, I believe the park will not have
a major overall impact on our police services.
Lt. D.R. Persson
DRP:bf
•
OF i ?
•
a► °r o THE CITY OF RENTON
, MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH. 98055
0 rV. 't
BARBARA Y. SHINPOCH, MAYOR ® PLANNING DEPARTMENT
0
9 �' 235- 2550
09l'Eb
December 30, 1980 •
•
•
R.W. Thorpe & Associates
. Attorney Jon Potter
815 Seattle Tower
Seattle, Washington 98101
RE: COMMENTS ON PRELIMINARY DRAFT EIS, BLACK RIVER INDUSTRIAL
Dear Jon:.
•
Enclosed is a marked-up copy of the above referenced document.
Although. this department has not yet completely reviewed •
all aspects of the report, the number of revisions . warrant
forwarding the. report, without our final .detailed comments.
This should give you an opportunity to commence the corrections
at this time.
•
Most of the comments will involve no more than language revisions',
however, several items will require additional analysis. We
have also attached a more detaitled preamble for this EIS, to
` emphasize the nature of its• analysis, and necessity for
' additional work once a detailed site plan is developed.
Please, note that this preamble describes. the types of additional
information which we will need in the section on Alternatives
to the proposal. The, expansion of the Alternatives section
could be in the form of a table or added text.
After discussing the traffic analysis with several different
departments, we have concluded that a minimum level of analysis
and traffic distribution which can identify "significant"
areas of congestion or other problems for each of the .alterna-
tives. The review need not .be so detailed as to look at -
specific turning movements and intersections conflicts.
•
Letter to R.W. Thorpe & Associates , Attn. Jon Potter
December 30, 1980
Page Two
Attached are specific comments from Traffic, Engineering,
Building, and Fire. Comments from the Police Department
and our final comments should be available before the end
of next week. Should you have any questions, please feel
free to contact this office at your earliest convenience.
Very truly yours, •
Gordon Y. Eric en,
a Plning Dire
1% i
//
. le ifisJ le
0
Senior Planner
DRC:yb
-Attachments
DRAFT PREAMBLE TO THE BLACK RIVER INDUSTRIAL EIS
The following EIS is intended to evaluate the environmental
consequences of rezoning 71+ acres from "G" - General (large
lot, single family residence) to MP- Industrial Park. The
EIS will discuss the impacts of changing all or part of the
current undeveloped riparian forest to an intensive, urban
industrial use. No specific site development plans have
been prepared, therefore, this EIS will only address the
environmental impacts at the general "land use" level. At
such time as site specific construction plans are prepared,
a further EIS will be prepared, or if appropriate a supplement
to this EIS may be utilized.
In order to effectively utilize this EIS in the zoning review
process , this EIS will discuss both the proponents rezone
proposal of the site in its entirety and three primary zoning
options . These alternatives are as follows:
1 . Development of 75% of the site (53+ acres) in industrial
park use while retaining 25% of the site in scattered
open space and natural habitat.
2. Retention of the east or west one-half of the site
(35+ acres) in its natural state while allowing
industrial development of the remainder.
3. No industrial or other urban development and retention
of the site in its entirety in the current undeveloped
state.
The following table illustrates the comparison of the proposal
and three alternatives :
Insert table similar to page Ii 20
The alternatives section of this EIS (pg ) provides a
qualitative analysis and comparison of the four land use
alternatives discussed above. Those aspects of the natural
or human environment, such as earth, watery flora and fauna,
aesthetics, and recreation which will specifically distinguish
geographical areas of the site which may be considered for
retention in its natural state are expanded in detail. Thus
the alternatives section provides a ready reference for the
City' s decision makers in the rezone process.
•
INTEROFFICE CORRESPONDENCE
Date December 8, 1980
TO:
/ Warren Gbne ason % . �• .,
f•�
/(7
)
FROM: Dic Houghton/Gary Norris -,
SUBJECT: Proposed Draft EIS - Black River Industrial Vats
This is a joint memo to provide comments in response to the subject E. I.S.
Traffic comments will come first followed by Engineering.
TRAFFIC
1. The traffic analysis is very general in nature as a specific analysis
is not feasible until a site plan has been developed.
2. I disagree with the statement made in the third paragraph, last
sentence. I do not believe enough information is available at this
time to make such a statement.
3. To this point in time all other statements appear reasonable; however
judgement is withheld as to their acceptability until an in-depth
traffic study has been made.
4. Developer should be notified that he will be required to make all
traffic related improvements adjacent to the site necessary to serve
his development in addition to paying a $20 fee per trip generated
(ITE standards) to cover traffic system improvements in addition to
those adjacent to the site.
ENGINEERING
1. All of our concerns for utilities will be covered at the time of plan
submittal.
2. A definite route should be acquired through the plat process for the
P-1 Channel and the Valley Parkway.
RCH:GN:pmp
LL1;
Transportation Engineering P!annin� (_tin tiIN a: � 1' r )
P
November 24, 1980 T—
Mr. Robert W. Thorpe •
R.W. Thorpe & Associates
815 Seattle Tower
3rd & University
Seattle, WA 98101
SUBJECT: BLACK RIVER INDUSTRIAL PARK
Dear Mr. Thorpe:
Thank you for giving us the opportunity to make a preliminary review of
access considerations for the proposed project. The purpose of this
letter is to identify anticipated adverse traffic impacts and to suggest
several alternatives that might be investigated after a more detailed
traffic analysis is prepared.
As we understand,. this project will be developed with a combination of
rail-served manufacturing and/or warehousing uses. The proposal is
planned to be developed in two phases: the first phase adjacent to the
east side of the proposed Earlington Industrial Park, and the second
phase west and adjacent to the proposed P-1 Channel . Access to the
first phase is planned to be provided through the Earlington Industrial
Park via Powell Avenue SW and another internal access street. If no
road improvement were made, access to phase two development would be
provided off Monster Road. As we understand, these two phases of de-
velopment would be connected via an internal road system.
Although specific site plans for the proposal have not been developed,
there are several observations that can be made relating to traffic
access. During phase one, the majority of traffic will utilize Powell
Avenue SW as a primary access route. The additional traffic generated
by this proposal should be expected to increase volumes at several
primary intersections including Grady Way and Powell Avenue SW, Grady
Way and Rainier Avenue South, and 7th Avenue SW and Rainier Avenue.
These additional traffic volumes would add to the congestion experienced
at these intersections; however, this congestion would be somewhat less
than normally experienced with other types of land uses such as office
uses, because the working shifts normally associated with these types
of uses start earlyend
.,,�,._,._ z;�,- r,. i n theme morning and i n the mid-aftern ;C `,;�,;`
�e�ue��sE��,°�t(r,,1,P�t�A�o�lv►ir�'°� ��1. ,/'��,,. o n. o;n.
o rt 1 °tNp ➢ry 19d►�,i nd 1" `l dF". ly ..
ppa,;hatir that ;o cur.,F,b ° p rt^l n .' he h '
Access for phase two is planned to extend out to Monster Road. This
connection may be less than desirable from two aspects: the first
relates to the difficulty of constructing the road across the P-1
Channel at a bend in Monster Road, and the second relates to the ability
of Monster Road to carry the anticipated level of truck traffic. While
,✓/ Mr. Robert W. Thorpe 115
•
November 24, 1980
Page Two ` 14srs.
• Cro 1p
construction problems could be overcome, the structures required could
be very costly. In addition, Monster Road is a relatively narrow, two-
lane road that has not been designed to serve the anticipated levels of
heavy truck traffic. Moreover, the vertical and horizontal alignment
of the roadway often restricts sight distance along the road and at its
intersection with Grady Way.
To alleviate some of these impacts, one alternative might be to completely
rebuild Monster Road between the site and Grady Way. This, however,
would not eliminate the construction problems associated with connecting
the site with Monster Road. Another alternative would be to work in
association with the development of Earlington Industrial Park to' con-
struct a portion of the proposed Longacres Parkway from Grady Way north
to its proposed connection with Monster Road. This would provide a more
direct access to the major arterial network. Regardless , the alternative
selected to connect the site to and .from Monster Road, it is likely that
Monster Road north of the site will have to be upgraded with certain
safety improvements and improved traffic control at the intersection of
Monster Road and Empire Way would have to be constructed.
I trust this letter serves your needs regarding our preliminary observa-
tions relative to traffic access to this proposal . If you have any
further questions, I invite you to call me so we might refine these
alternatives or discuss some alternatives that we may have overlooked.
Sincerely,
The TRANSPO Group, Inc.
a-ak
David D. Markley
Principal
MEs . ® A NJ :
FROM THE DESK OF , , a .';_>
December 4 , 1980
JIM MATTHEW
FIRE MARSHAL
TO: Gordon Y. Ericksen, Planning Director
RE: Rough Draft - E.I .S . for Black River Industrial Park
My comments regarding the development of Black River Industrial Park are
based upon present capabilities of the fire department given the follow-
ing information.
1. Virtually the entire area is located outside the 12 mile service
radius of the fire departments ' first response engine company, and
2 mile service radius of the first response ladder company as re-
quired by the Survey and Rating Bureau standards.
2 . The present statistics indicate that the amount of responses per
calendar year are increasing at a rate of 25% . Present crews are
working at or near capacity to maintain required drill and inspection
time.
3. Average response time for the area based on statistics gathered in
1979 is one minute over the minimum required under the guide lines
of the Renton Fire Department Master Plan.
4 . Plans for a future fire station located on Benson Hwy in the vacinity
of S .E. 170th will not improve the first response capabilities to
this development.
5. Accessibility of surrounding fire departments to the area is limited
by a man-made and natural barriers; and is subject to inter-agency
agreements.
6. The typical type of occupants in this kind of development is of a
high hazard classification either high piled stock or of a highly
flammable or hazardous nature requiring special fire protection
considerations and increased intervals of inspection.
Based upon these considerations, further development of this area should
be limited until such time as improvements can be made to provide timely
first response capabilities .
I would refer you to the Renton Fire Station Location Study conducted in
1973. In it, under recommendations , it mentions considerations for a
fire station located in the industrial area.
James F. Matthe , Fire Marshal
OF I
�� PUBLIC WORKS DEPARTMENT
7: telL
i BUILDING DIVISION 235-2540
9 ® ' ' MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH.9C055
Ao99TF0 IEe3'Qi�'Q,
SEP
BARBARA Y. SHINPOCH December 11, 1980
MAYOR
MEMORANDUM
TO: Dave Clemmens
Planning Department
FROM: Ron Nelson
Building Department
- RE: REVIEW OF PROPOSED DRAFT EIS - BLACK RIVER INDUSTRIAL PARK
1. I have a major concern with the single access proposed for the
Phase I construction and the inability for emergency services
to respond effectively.
2. There should be a detailed analysis and plans of the traffic
system for the area bordered by and including Rainier Ave. S,
. S. Grady Way, Monster Road and Empire Way.
• ,�..;, t PlLi\ r�
DEC 1 i 198° 1.
1 r�J
44/
Y ?
G OE
r",'a� ,y -.. -;7"' .^��",+T• t9f.., p� �... 5• mina,..:_. _ ' _ �,
d r L(, �-^� titi�p` } hErlhSya"ay�Sl fi,�{f.,..io'j:..::n :� is ^vw
i yy., tit a'J,, t .l;.tit i•'t.? }„ r't -• -
,1f;'' 1 •.�
r_
�R C•.
`id & >w
�-, � 1 s , � .( `•:T"Y > ' '� a4 � t.i't .� r t ,I, A 1 +,.
n ;-r t ,. `,r c• S- 4� 'y '! Fy 14•r' y�`.'a fF '„tt * .4 "'ttr+.1 n t
, , i ',4,4 # . ,t �(f + • a •f r 4 '° . < t .# +,4.: r i t
ee
• Y a;4: r K• -.,••.•',A,ra . 1. .• v [1" t.„ afi =* h. ,
! vim
•(. , , 'w1" R d 'i k.,:., y: •• ,: 4• ,�C�" ¢ '#N i1�` $'4., ,:.. /" ,� It 1." S- T 4 ti r` • R ' `�4 .. ' 1- �4 ±+ ;(,,��(g(g^,,.'����,Y7t'` liF:�-• • -„_. . .' 4 .45, LT FS ~` r - i•. .. - _ .• K},f.' '' SC" -Y '1�� yl� K ,`14
� 4 It
Y"ryl W-]Z1.:1� a{J 122301100
' .•tin: 1,4.,^"y"-4 S•
4,k>.'14`, .++•m•.msw,.......w....:.......-e+s•r s >. .`"r.v. .."s.....w+.__� ... 1K t> yf �'{,-g 4'0,
,2 It. i I I 1
l i r if r .. sea = g . K � ".
ee _ �
';10 �_. 8 4 x i V a It 2 I g g a = a R F.
.' i` ate'. i
' S i is R o r M • 8 3 R I ; i C / 'l;� -„ +•,,F i.,
fiy ,� i ; L w -iffi ds •
E211225 - i 1 - I w : i 1 • J .K w E w ! -e :'5 6 ��L4�, `F
�...,�a I`,' i w w i. R�a _ Q it rt. �1 e� ^ Qbp l O • �,y. .� 73,.0
ai
" ,r,. 3 =' ir ' w . �j gr O iw Z G •
a a 2F. = 9 e Sr''S^ 3Y tyF
'.` err 5. r s rat � � � _ r " ' �rs � .. s pik, d
; Irao [ V° i lets.14,,r-litl.,...).:-Y41
tte4201,1 : ! ill' litAlli : I "r :44 1 ! 1 iii....-ito-, g-o :,,,v...
«: '.• It• • 1
F ype i y� C °. i
�y/� R C Q R " F >„ "4Y�r'.:
^-y1.iAjayr 3 • = •V /' • 4'•.•:re. . r I [ a i a 4. L„ /f PI •-• n.. a .'�f +r}e r U!� rtt,i
11! r • = 11
et
li l t''t w 8 Y • " }ram+• �• _• r It;
-.'� F S'�'i�� t'' r . rgi _ •• Lq� A •i ti i ® 1 I e ■ .j yV t ''N- ��f ¢.#':
g fir• iI . rr ! r1 ' a � � ►r: 1t
h Y
•
}r
1 ,,T�j..; .i 9Z`' �'1nf. 1,A. 'rn"'.t•hfi''^.N_-. .bi.w-.L+N ( ,�,', Y'} *�+ ,�'4 RY '!. i 0 I� YI
•
} h'w'Fi+4,t;yijj'- ` � ;:r';k' }` '"' , .r'r�� rYt;'x'�a t y'a,Y�.°{.Ygy�,,, t i°t r� ,a ,,.q,'•fi.,Y' . n s(.'�r�Y1,t+t 3 4,,Ni t1,,S•
S.S,2 t o ••l• I.'rgF+t N;S+aStyr'i'k ; ^i1
'"Yft` +�„.• " :•ct�4, 'P+:1 3 }dy, ,,- _,_�,(A tlMf.r, '•� 1. �.f k "4 i a a,r ,'. .3.,J7... n,?: ( �r•rhb .w i.t, l; — 13
D•71,,�,, t ,y„��,..y,� {r P,�,{{kk 3 '4:r _ ,R••V-',,,,: , P+'.1 1 t •''l'•., '^ ,'a sir , ,.r•
-. r1, ` :,vsi... ,F .+ U.,,t.,{h,.:1%.,t,::,,. , ,:ci.,rk�i-.•4 'r.^ ' v,.'_ :.1,, .r'' ., 1 l4. s:r, rt , ..lr''',`:::y GI.
',' �,r ••`r .N -'t,,�.,5. 1t: {.,.. { `,ij,:<" :t.' r _ 't t � rn
;:r''• .,•. i#a' mi... ... 'S'•,f _ si ti-•r .�.if--i. .#.� (it.r !,,{ ,i :.t'• ..u:t,-,,, 7 :x' r::s. t• ht`d7 - `' t. .,.14• =.
e,� t �'•?+'� .xr�,y=li „�i�J�.'-y't'Fr:' -'.'y;1,:�+'�`:'•`.. ..3'� - :a-ty~- tt:_ .r(� ,sr.! .,! :1u ;`;Y 1�.-`tip ,��, G
.A' .� .,,fin -`X'7,g?.. ,ti,•c.ro!-•P• vYr•. .P.(�' / ;a.. :�:, i,:''i J. . _ a..',•- • (` .t'7 f
,..�y •i�J��s,,:Cu�9%`r.+a r .,J'. Lid !•-.'.5,`;�L �A;;;..C^.' ,.qg• t .r� .��`- ti°:i� r, /�
ti : ':.:'' .,'',• a3•r_ { ,:..r.•.( C \ J}�_ :ia4� ,�. �4,,��a:••w -�'i`.se.r9r•..:r�n!,i;';�•t ,.,�,r,.ys.; �•,, ,.,j.a,� a 3�_ .s .r ►..� �1
' :.��.fat., �•+�,•,r ., ..ti.,. •�fi 4• •i):.��
•" u rr+z: '' y6• y��: ('.a'! 9 a:�J :..h:;%„r>^r"zh.:•s�o-"7i' Y .Y ._
s -
V+t•Y r'{,S`l; M LI,t * 9. ,t11h j•� r/.3.�5+f „ 9 L•r� S +f. iNA 1 V- •fiV1 41 "'C aY. M yyr 0 tl
yf. t >• t C
.y 1 of { s*",t i I t 3 rt ,• ,,,1 . '. ,,,,: '(F - y ' { } n..F1' it .'n' ,R t '.,: 5 ', 2 '(' '•e a . . . VI
rt."'' 1'•� Asa• r i - ,:. a>t, ,xY.:- _i f vah a ry (,✓,yl,rye y ,:twy f -Y!!l... + rl r'-y r„'. 3 t t r < 4. f.� .G /,��
,L ..f 1`" .4• Arr• -: - 4}t.,,.' --,, •k , 1'° 1`t,N:.1`}'7, t ,.' '01' �4 v�g, 3 t.,y.. ,� y�
•ii
•
•
"70
%7!'} �-., .f+ ,� F.,.. 1 yae,, ("& J ,,tt'r"Fl. - .3' �.Nd d'`-::,,:,,°,:' l '' ` � ,�•.' ^:D !t tT_ 4 R•'.t7v.. <7 ly 'i - 7 N QO
,wi .6. ro x t,. .. . 'ra- J`; +r ,"•••" �•..6 �"... .+'.r. ! - .';.•1t..t, _,..•A y'' '': ,!,•r.w. .-" t '• ':Y" S'y �• ►r'a
1 ".. .rK n_ ., ;•,..-. (Y'�tint•: t ,i1,: .;,{ t.. �;; -C.'.....c,.';_ •.,fy _ Y':,.4,•t�, ••: •,C,; '• v
y-,+ Sy h? '!,.-G\-_5�4, k. •�i 9r.�•(!.«• dl••ac:r5' a .m. _ _ _ 1 l.. t•
•:1" - .t' 1. ,, v.4 t''•-`,., :1-: r•'". .y`((, ,q':•..•,�,.,*•":.•,n:'`'- -0 h .,•.c /f, , .'ti ,s;,,.1:ii7;w, .x2 i W
oyr t C' - , 4b°`'r- Ia' 3< ,. 4 ' x! 4.s.'"!-rxs ' :I , •
, i, •J @ , 'e- •• ,r f 7.1 ",. .r,,''x: ,,-i t s r t. '-. J�t tc ti t.x - ;i... .`` 'r• ► Lt ,,t D
•
1 r ...1tN' — , r.t,r ,F tali`-alb"ll a• ht,?,..•' ;�} -y. �'
t• C a , 1•: 4 ic:CC t { nr 5,`.R�' r1t it 1. ,}dam!' ..t4,, ••4 155•', ;:
u , .Y• ' .''4+ v r: 't , .'••` s..' }4.• .7 •t J'c 5 f ' • ••`' ,^ a0% \ M1 r,fi' P. • y;F .'•
�`4' a-c•:,Ct t c v i 4•4 Y 3a a.,#` • � • 1- V, ,. a �v r fr .•.'"
,, >!4 ;�„ s�y,t 3: ? 4 •
6, `1'' 4`n ♦ w Lk' Na,I , aR x - • rt i•* a `+ '' ':,• 'r
It 9 r ,w a, i t ' + z 3
� .<, '�,{, '.l r. • ,` t i'7TF Nth r•�r ,atixc. e�k).ry tki� -�uJ� ,^..��X }S �� rr r .r 4.F � �M
�p•{%_ 4., D: ;t' •a., .i rt�-•;C i.; •aca .r,;�t>•,7(,,1 ' SA' "-"'
I?:�a � {{ % 'i•..•cr:`i.:^-J{z d':',..�.P:S'�.%{•d, •.1C.....d?,.•,:rs; -y�4e ,/ ,;-sj 1s•;A4,.
f d• r ° ,:t' .) t . .,r..3'_r. ;•� .,at.,''•:;S'N. .�•ie: .. '. - � -?,},- + -"`y',..
r,.r •r�� y .a, 64 w :t•.w„• ,L4 t�+{., ^'�.,`�v` ,i iN�}t•
r. ,., yiApr •;' �,., ,;:, p{•(w:.'•• :,, •!!ry :{v;;,-• ,). 'h;;•,•(rC ,,,ft *'f
,'°'�
Oi! .'f•' :F. 'i 1• t r t�.J4. .ra�a'r i '�7.,�' j7'.yt. ,� d 1�.{.y .,;� :.�
'.v• ,aq' + T' �'ry yr .,;,i,...n.,:,f bik •....'_G'r„rY?•.'a- p�:s.: J‘ E�'FK 7',
Ekf,e--t: •%`. tr,. i `,+�: `,��, tdl:- #p..t„h.,43 YY. � •C } +.w�,{
+ 't' •� X,e . i✓a'< ,"e�t;r:.�^'(�! �r.1.. •1'�� ..��.;:1r .~�Ftq�-Lia�G/:ed r-'S ..1, ^.r,�t.,. w•k�• 'r$• •„'ryF "E- •'J7'S
„ble 4.- ,t`. y..,, t'4.,;::r ,-;`t,,• •i.}[;;i. t•TM,r t•-v,mi.�;;�•'rw.:•1v;;...rx S�•— ,,•,. `7+ a, r, e:v_ 5': , - `w. .•+ ;,: ". t,.-
•
r`arr`- i 11,f ".71 1„ T•-.- z'`"'t.:"4':• a`s Y'1 i• .„k•� +' r -?+.. + r 'h :l ,� r '•
4ii-' 1I r• • Hjk SQ@i' . - yam_, �•-. '.
`; �`,, yip ri+
d Si c 4a ) ,.cy 31X,1
1 tr,4 ' '.'
M i "i •11
iII1 v;t
o'a. .
d.r« \
E.
1 - fi
8 2 a=
El
ac' go fit i
I - a r
„k4
•;, .
#+7d,`,.t
`•' h i ' . t a Y w +p
Y39
(yq,�=,T�}ri, • i 1 ^r w
f2:i r �Jf t r 7 7 a ° �. u
itillit'liil,:,,, ,,Ii• iNM r +rf I txy; � _ ° " r
S
.J:14�Sf r3 +r. 9 • • r sr
liltY.D 'tt� Y• 3 'r ,.'j�36f," ' f
1 t i y fF'Y 1i-.- oe _ _
+.�s'�'v t ` t d.. ,}3,`xs i ;"t':"r`4�` X r: .r- .I-R• •
P `t`"' l a' • . . t r -:41 .n C �'� r..
t a.'", y
1 t,r ,�� a,.ua: .., ',,4" t'"4 r 1i rot t<i rn •:t it �, t", h a r r ' awM. `.y'.'r.t '2 fj i .,.a W:1'',P ss .1 V i' Y ,.20lu,Li..',.
s r t ,, '•t hi aqv! ITx-_ t t •..7el. s,'', 'r t +, r:i u' 4-yy f+,a tH.w.,;-, r-^ 'StJ �M^ '^t( *^'` •-. r ' + ,^i.t.4'q`';'� d' ,t� � ��•�k,. .(>v, ,.r.'r ,}:u;;t.�>.,' :d.;�. /,"�`n;i,,'�.�,,2. -Ys'v y4,+�. �;.�w.•' rvz;,ir. r-'cv,F'.`•,„'r .-s:�'„� � - �r 7Zfri •fir, ' L4 ,Z,_,x ;!.1,,;w'y` a tit.' ;S ti :r r>,!},1'� C i `d ¢'1•`h;'4•,'.-,`a.+k ;ISd 't'v'l,!..1`4 r,!�.;"Q; %,t,i ,', :j„,,,.. it,. it, t '� .•,r, .�6":;*t�'�,r"a''-.tr.`�" t 1t w�• ir'1 1..i ':K:F,7�w�"�,,' a,���'i` �c�x:,h^:"L;,,-Ve..^?.*e�'�.T�i''�a ?•�w.�'�.i;•:•'h� t,y!nti, 'ttl��ll,'hi,'^"nib' �`�1�"�,+ a.. •We�ti+rt
� 4'� re'r:'..�., -!,A, 1 �;ai, , r ,( ,r,:i jr�,•, r^." ' 'L i.'.• •! .1`p,,, .v a.,,'MYr Jf,, ,Xy
%t•4i� `'�•* •.�••
•y^ „'!-:'Y' 4qt �'r, g, r m si�t�^ i� f � L'i':' F+� i ti �.'4 ,{y4't '. l ya•F'l �.:1 � r � i`J. •`%�
1' ,, r }. d:' -1'1 _ t la' i u1,`, -. irx f:?,i. ,'M•{S 1 c4, •,z.' rd r•
d. l t 2t S-, {}' �r�. ,4i .0.,.r .• 0 h� `
k, .,eti,?�t 4 ,'t'i •q b ymf c -:r ri 5 4 ,X. . V ,ir y',�y '51 1: .2;1,,•, 4.9' to .,3� v. rr �K
�.. i a,-4'' �14. .y,�"`. ,! 7 �� '1 �_� .roe• 6� a nrs•�+XR'x Sr r✓K4a j�i� .��+-�, .+,.
• .` `' fit, Lt }. y mat i, a °'tt F :4st �1F; ea, r a p +c. 'F rI° j 1;•a '4."r. < ,•
, a, L .v •*,, , ` , 'p y s e f` } ,� n b ,r'' ` n+ r ' ' re 11 r i `�. ','
e ,
•
.0 r r
'Y B
,i. r ' 4° • .r a '+ r.i- .. -P• . rt ete w`t" iF• -. ,� +. ', ;.-.
f%K £ ,i'A hi+'rtr • ,::1 _, : , !x t �,t 4.t,kl 3- } v �?`., 0›, !'I. t' 'rt4 n„' k i r
#¢� X A.� r `�e'"� 4, �'.• 4rk ,),.E4{,. w •,P,'ler, �} +;.,�' n'• '' ,r7� ,-t�'t' � ti.'.�'g, p., .'t r V'`"''r'h ,�����''t.,�
jT'fi.{X • •y ;+A,e",.q { , r t§;t �,`�:!�: t.,'.i �,X- -) P i, 7 D r, R ,•f,' ,+
q, 0 ,f. 1 i4I. n, 4_ C, ,,t Y.,+,_>r_•':r � x ,,.: j, .G '..'7.4.`z ,. d t '. 0., �>r 131, •._. $ 1
r r ;Z 'X, , 4., ,,,l... ,4,,'-`.t; fire'•i'` _,...{,. ,.'r: '' ie,' £SGSw.�• , k17. '',Ft• •"41„.! 4r_ . , , ' I
11;11! p s M , c1,-:.1 ••'v.,1,--^.••,--. , ,>^,...M•••:# �•• r.---�:,,,,d die,' 1 rul'A`P.,aY7'' ,' E,..a&•.••,.t..ay'a :
FZ. {Lyy�"a. `';r'�, `,rW 4:\ v! `i':�: tom - •`'.'• --d `.".:n,t-,: .•{ : P', -r g° .4.1.11f.ii)?.,r, re, '�.s::at!« 1. ;s}lr.r i',,..' } ." 4) `t' *F
xlf;6i15 '4' ,a-,r( ,4 rs• S:! 'b.. '>.�y..``� >,..• 't .;J' 1>fi. k d ,: 1t: ' r° :,,a .�}'.-'t Fi R .. • j*'# a ^' :,sr�
,r r E R „iTFF,�' ! 1 7 , "Y�.�'r:..l.J:,}•'+.ty��?rj .11. .yr--,i •^•
il��':J �{ � ,,}}�'�; '
< .t, yy 4.rai } ..� e' Pc :t ,a • r +.3�.w:• �.L •r..S �} c it < ���' r.
1 N ;31 •. ,,,,,- .1.4r, sY,,,.,,4s:': , .1 '-yam 7;41,„.•4i•,lr,...._ :I�ri. t"" ±d;�,�.� }j-,•••• Wit' •` .qt. •v m.�.
C}, 7 e l , t..,..sr/ T ,� - • .%.. •i :^r4 `•.u rw�10 to 'tJ: ,• }�.{iy, a i, 'c`4 .$,M -, � ..
tl ,.; c ',e` ,',�+v, •,5+ r, d f%4',y F ij�•';, ;° �<, r r E 'y P�4aR �'�:? 5.
_ x `71. - fr f .Yn,•'• a GIc -ra _ a v =�+ "' ';r'1'a` A�'k,tK .ykr,•,
•
'' ''4 '!' Y a t `t' +t f'.+''-lg j #•' 3'€V 44' `.�-, n1 'Z" ':. e.77 ' i+f,.'l' +1n e t 4'-„v,9' .•, -i
1 v'. �1., f 7 .'I 11. ,t- aT , x 4 r4 +. ; ,r ,kr �r. - i 'Y a •
'pti ♦.4 lf: '01,•, .'r ,' r- Y + I , emirs `�,� .- .+,,,, ?`'pki" i}*�. X'Y.4, d`irJa;•;"'`: y�y ,,,, .y ;'.ypsJ ;! ,,'.• - �.. 'j .- �_
r.. �a +. .; o b_ .. n'l�`"d',r' 7'" • - Kg t , .r, " ,t*• .Lmi2. i � .s••?� ,;r„c� hQ'r'a.�� r,, Fr-7 1i-".$.1,,,,'j -1r,.�
... "- ►R, "` y 4,, ,3
y, b ,.II. ;S' c. ;i` xf• . 't ! `14. S.t•);•tti e•-!J `"`.'..Yr i� t'n ,.1. „,/•-••,:"4•t;. .1 t• ,.. 1• ,
.w .i t- .,a.ck•-§,,,,�,w4• .41,?#t r , y• rt xTr a....J\t. '7$44r5.. 1 rf .-;' Y:.4. ;'?" t11 s,✓''7:47.^" . 9
. ' � ,. � •yn, r y. r..,L,V - Jn.r i ;y .�'- .s. ro s:. re V ,•n. Ni.,t;, �:
'y 1� N C v,:i i+.'sw C F.7�.^:C.';.tiA u\ } <��..y�; e.,.
-{ v ;.4�'. , ;r.,"`. c ` •n.4� • .* ;''''s :'a_ 3'n6^ �•,, .7ii' Z:fi'A044,;- ,,t:"'t-' '`•,```fi�t .1it ,
• ., "�'w• r` .,,(/ 'o.! • '. 3, d t ••CV r'r y.• ; t`�va:,T \. .n,ti ' 'Gj 't"- .:�� f H.r.�• • ftifi .*,1 y,#i'.
k .� ?i-4� t �L F �i�'w"� lr 4 h�Sio.�.,..j,�xla.Yw y4,:f .: ;i, 4
,LA�y+, � .ai'. r � t1 .s'./^^ .v w1 �'C"1 i'' .d6 2�4aa '' °C:+ `� *°
3.q.w'y4+�' �A' a�: � M s e� t I.� s.& '4'4°- i n3'h �k�1«t• t I- \4� 'r
1 1I�
+.44r S r,..ry _. �.^ ,a * r-,^Vs .f li., 1 '.,1 :.Y• .. _ _ - ,r't., �^\s. ,,.Mlg
yi tr''.-
-•
-b t
3., ."A 3 "4
, 11 7:. Fitrzir: §. 1 ri:ii 1 .
r 'ilk a �� � a $ :lip"LK II s ,f, lt .
,4. ii sit , i 1 N 1;ELIMLI 1 "4::", : -p,' $?§ 'x•.
*''` $ tpt1. al 1 Fl $ e E3 ' ` mo § •
•
g. 211 ,s •.,ti re *
I t 'J( *g s " I t
1:5- fir
r'r .eFe ,• S. I s , ¢¢
..'''` i" 8li 5s _ L , a nil � r
s2£:A-ii•' i `•. ��� ` ;41,'��¢Nj.* C IR.. z r �u ..���� e�t s sffp •� �{ s!s •lo �s rl,�, • ` k� y Ty:i'f, , .6 ! s w K a ==e S = g .. > rei ,x+.',+;'r •'�.4iY{:'tNfi,, (, a • C1 s, �. 8 i�• ' e w ° •'.',y 4,t 2Tr'ti�xr e w i a! G _ y�{ +1} Vj I r + i :$ _ c Z e a i L� t • ��i '° a,§.; G?, j1 ,k'1',
•
�•� SP
i, Po w
t,r
y -.r- •„ ? '' ''r i ' s.r• i .3 t" �t\�'F 'y` �` ' `s\f3c 4"-•F+w•1.a `K€''� *x#1 . ' ry p� fra
•
�§yy' 4^ s `' -y ' +d'` ".•,t,x,',r,.,. • 1 rx� � ,•ty..,9 �yr .. ti `..4 ••%,. .•' r'i�.,7
yy + 1!" :,47. ,V4,4t ys.".*A .tt't`'t•,`n`z ny'�• , +P±tyaly.4y .r;ro. '?.fir, §•r.,� 1 , Y=rN,:'r,•4• V •M1".k•i'' :i y0- r. t•c .:.: :i-.41
,,{ jr 'i '"°:_,'. ..„ ?�,y c }S. X 54 mo,.3t'' , , i.'µ.`.1:-,•. ' ,.. ,,. ,t,r.;•-; 41'if .!?r.. - A
rr��•.ti .x. a•."�'y��•. rr�G.,��"*r nr fit st, �, .�i'.erg.}','(�slycr `_;.(�.z{(yf,>,r. »'1i'•�%`•s�'yrf''":�a,:`.z'^%i};,:'•;-s::,aM1 .,r-'•.,• .� �..•.- ti .:'.�t"
•d ',t.►.-^"?�1t;' *t;; .a x,�}}rf!_.yl'7-re• .";. :xh.; t�-av • ['-, i"'-,' z;<ti!• 1 1. ', .,Pis e, z :1>.;9:bv`",...;�'".tt'-'� ,t'J.,' r c-•-':
; ,. 7• -N' ,0- -.§:i ^'�% `.t \� .:.. N ..••: .. .: i�^.1.-,'i'•�_Ifya^, '!; '.,.+':?s'-,.i -!: _ r,. •�••' y c,� } i1
} }� '.rf 'p :f.3:'r..,t.. F��`'`•lr} i.� „•,..... ..?;� a;o t _t. .fit•...�. ;{:4;.• .'.�.. ;i'. - .::i. �.."•' ':`i;.'U-'��:.rY'�. ';>r;. ,, Ica
_:Lrrj'•,� v 7.h� *��k`r',"�•i9,,��s• ter. .�'lr 1�. ,;`••.�'y.:+ x�:§,.rr�;'-.:- 4�.;;l'.T�t`•�i}�,t}:; ''J'r�, :5'^.`;•' �,.�5: ..§v_
i5' {.-`�' ",�,�. >� n�:� a 15 ;,t� .:f:-'�:te ,s�r•,M�;!...'^i':'• "';il`^.;S•. >•.':� ,ti,.�. '`;\;ram'•, �I x . ?�,a.t-='' ;>>.•
v ,ene f t 'n
...v .i,: •• 'y.i
? f "'l •�•it-h _Y n1\'-•,( ..1 .'y" ��y;',,, '��r r,`r.`-`�`, - '; r;
s�����:�� .'T° -� -dC *�.•F y-w1= w'�'�_`• c rr„� ..•�.J��z'.^K d•�Z f J.,o ••t:' . � •..
', , w . 1`- 5��1• � T � `+ $ �.,�.h .rr } r it [ t,c..
r.
4 ,••• 4 x'- 71- ,N.
` . i'• 0-,. t. ., F '$-i b •.,-� f s .,I [ ,N. .'b * + ' ' #a, • ..
,♦ . , •
•
''r _'tk':"'' ,'4t t, ,r, 0 4 T'.-Yd}{ t�j -;,pry •..-tl `(' 7r '� •Y ti<•1, f.4.s .. , h,. icy ,s,.•rt;:»'a e; Iz, 1\' LS,.r •yt Y� 7''
��ti,ilC�.. I ,!�'Ik �' �i ��4f'� i rl5a �...{.:••�4.�L�t3d k\ 1•�zt.:.. �A Ir Y' � '"1 J' r E Y 7y 'A,
. r'iv' 4, .%� a rt ,\S-'„\5 3 J'r:,:;c, .t. 7.„c;gt Tom, ',,t'S,� ,. - • I •
, } tt 'rr t ,.ir F. ;.i ''al;°F'•:'�J. r f ..,r;5;: ,r•..F1.:r'� 'i'f r ,�, r�\',� .,.� Yl -:",' .�.,i'
�8��l.�,,'� S,, �. +Y, ° :�-rY,.de,. ;•i;•�l'Y^ 1:� �v.1 }`f,•�_- -r`a:'.,•'I ' _ �I' -- �.�'tx
"M' 1:4 .$�i:�'`Z �i'h. ` +``�/.i •?'t"sa - t.r'%�c;'y" tar;.-. :r;.. ��::.ut-::.;'.,.''- >:=.,.x..-. r:.c' �(,
14 ij', � - d ,.r .,.p 1.`1't,J:• •rrt; _ - .;..: •i..:�
tim 5'". _�i..7='•v,- ::tom �,,,r-�' :;:/`:;'',r,.•..; .l .,, 'i�- :•1�.c� :iwi.:r` _ 'r. • .\
•
,
of•1 �: y _.;z?,:,,•-• 11-111t .x; .,,• c+nl(:'. ;;T'o ;•1.'c? :5ti'. •...,n '•Xr:,,t• • • • .e.
� �7 x P •'�,f'2.rt: ,�if �i§'@ _U,c'.'1. w. �'� ) +f:�5`Z!.'St' C'�vv P' Y�:� f r 1 ar ,+♦ s j
{Sin+: F ,r ,, • ,l .. ;w •l," ".„.4r,kti. lit,wf.t :,7 _ ... 'F.~ "x. J,-U. a,.r+ I. ,- g •:; .y�.r+m,;.u?r • i'• t•.0- ..+
',.,,�j,r?, i ;Get
:- �. 8012230:(i'J
•
�f3, i•,"� .�� #�;< ° bs y �vr. �', ,�,: -y .: �(.,''x?x�?-v+'>,'?'�,fjx.N� ,k`"c4.'i4`bfi 13e. a.. e_ s A,(4v;{�€�� .�t ;��. 4 • -.t
y�' ,,t t,y4, 1 a,ins' t .n. ;,,,
�iP'�' ��3.'7��J v "ti7` *✓,+'s.°' g ,"v::y�#,, �9�� ;��;r• ny�'J•�.';,C,�',�� �,�,y:ukrhk f„<�k I� ssg �,[�S��I�'''«L:�.�`' �r7 �y.4
- F ' .k ` ;'Y;;,y"y�r{`r�' -sc-., .�' �+.�., .`�.` t - •s" °" ,s T';"a:is;st"' i;, -,to c�1✓r 4'P il"�: •arr ft. R4� ,�Y.
"•' . } Ar _?r ° ^kt4 •�y,'�viSir t ,„7 'n. 1 },�' -al,,
t is-?- 4i. t,-- p�
'A( 8 yy I "-41;"-G * .r g ".: 1 }..XZ4,:,,,w t`. r,s ., fair •'yti•S•1.CT -1,,,- .4`r° s. .;.it l t+0 t h, 3
' ,�� >r `� t ,1,��'n � �,� l,�f ",•c: :�'`s? r'•.rlo•+�, .,nw.,u' t': r:,•, .>�: '�ti ,,tt x„ yet y.r.�� � ?r- z �a�c.>. .
rr. h i rd-. •,J,-,y� r ";• yt:� r,.y .., r',„',;,,:�.,�, 'R,'-''.2•; 4"` ,n.., R +�'t-;,
1 '4{S .,}•�,#` ~ , e„-,.- 'Yil ..: 4..,-- `3�,4 e�_ -„�'f..' 'Y3`. 1.1- - :`N V' 6ii.l� � . •,P�,, 3"•+�•,,.;, i`....;.t'1--. - • 'G', 1R
� e -* ♦k r5'„e 1# i '.a k dt . , t � x :•��fv,.. i`xp` ,7 , .3.,'t • r ' C��"7x .t' 4 t;`K!' f �•^;r 1-. ' h ': c '•.,
r r • 1
j ti • p' S, !E .v1. s ",,",• ',,, ti' p 1 '..t k
,, , x ^7 0.4 :'t.`,r1"a" .w, , '•-' • x•'r: �' ,4 ,• t , t t m ,: , 9 KEY .' r
� �'„+ 4:, +w y aS 7 t _?y r ,t.,,a w ` •, yy'�n�ss�Y,,-4,•; '•tiFn °f°r ,tp-9r -• _:� ,4,,yy e�*t;� !. it'Y
' tiY 9Xf � H:ry� a<�t 'S aS• a. ,tif ..,.� '`i` .+�: -y1'?J 7'(e..;�„�.•w._,,7.i• 7et`•` t n r �> .� 4 xd,.r�y.., '� :'-:A •
•. t
'� ' ,t l.. '4; +wi: e„ s' k, s. t .'.t. i'"5k r, + `4" .t' � � .� .Y, i` ".4°°fir+. 1 7 ! ls` 'tv�' _ a 1,,: '�n ,p11,614r� ?{`�>.. •�-. '� ��':�;' �,; h'. 2�' ��� f 1' t `��k»�'�•:.." �• �j:tr., e wr'?-iy,1�1.�-',, .,r .�,, :V"���'�'�Y, t a:,i :AI
n7,�,�� �. •,�$',€yi i I„z �;*! §; :.7,a` r V?r' �,qa��° .t;' �{4 `+"':'•�`9h•h''lr >r� 'r� ,+. �#gtr e+-'`"r•"'"4.• ..� �7»i4'• n,t -',A1 '41.�7� t s W-V; 6s. -'u 3'';"-35�*1',?:c"' `'s�.xs'r fa•k ,- ;,,,.a.; i•t,.< ,_ -,;„.{.; t tk.:d `4$',7 i ,,„1,,
sue-.. '.....„• - r; ,"� -7F e{u`rN , ,,I-. +e, a" x , -' r� .?.* ds�r ^n, ^ •�' ,, f%, r-,
i '4• 'rf{ }.. }< a' 7.k- 'J " 'tr < a• • 7.'i �..►• ..�, ,y 31' F}4f-s l` r .} V',r,a ., tR� tl
3 f `i'i t,SIT x'1,'4a
F 441Kt
....h4 1 .
,1 ,:•,. . . 8012230 ;• 1,- s
, ,.::,-,* •),,,, •,,
,•:,,:.8,
,.... 1. ti,,,,, .;
4,,,,--,,_. k
,.. „-,,,. •
•
``x4 3 .`ir I ;:;ti.::::,
t7•F�'K it ra Ir 9:'it':.,,,:i:14''''..
t
skit ;" it
•
� ._ ~ #d 1. h J+
}:. ,Q4 '" :
i44 a. a k1
;��;r5.: �i wY.=*.„{•C � ,f'., . .> ...
..,
•.
i�t`_ J,•tm...•.,� .N..
• •
01,
•
`t � ; .i "%..
•rt`t" ' ' Sr r •s. ++ * - .'a r `1 _ , ? .#' 44, r r e ) t4,,- 't t , rt 11#
{
t' t` .,, 4 i ' ,'i tth k ,{fir' u + ' ": + :.ry' . a' H 1 ^„1' "} .1q_ ' y ' .," , p, , ♦9t: ` , sk a rtt .. ! S :' rvr�; r ':{,' { r�... . �� t_,.,. r -5,'':"'''F v'n' # �� i i% a �a c4.a^r,.�.. `' r ,.�111,�. -y,%•' ."1.s :a�,",w.1^..A..n1:^1.'.;j�,. v .;- : A A-,�.i .r.;it:-, •'� ., • `ii�.`
,� yv.,(3 Ta.ti.�t'i . p •a a �A4 y ^ 'a . i� pt•4'if.':-Vt;i ,`a % .'4:. 1�, ,j , :t.. ;�' _ � ' y • 4 - •:��.�,FS, y : 3 • .c fj a, �e r � , ty^rt-
' k� • : ' j;;h.'_ i I• r •"„:f c• }.wti '•G �wt%'• 0�s� -* �^ ..: i t Ss" "r .-ue;�s „ Zi' st,' _ '" Ffr.a �: .,. •..- 'e— :> )f .h }_Y„e ,`�� 7y rto- , k" „ # tad>,,r� �'sd "i ,.1 +•!. , X� en• /,: •', ..
.. _
•
•
•
4=4;v * x •`4ir ,r,,. 4.^ "tr _ V't R k • ¢', `- -77 ., .. -,• • ,a rr '4.1:..3 A`# ,G4s *,•
,.••,.." ,a-ae,''o,t. *. �, r F a7 • '!. :; r t •
.,�.,�- ,7,- z>r� s.. .> 4 >," 7 � r446�*�¢t� �` >t �,;� „ e :'es r�,. �_ � 7,ti.7 , _ v"� ',Al,
AI' • '�Z�`!rl'. F.w k `�j� w 1 1� �''�yJv�"'"rY 1 sI� 4, 4}M�.'t y�._�;✓,,•'`.}''�,u _ '' - 4�' '+4 a. • a•J •
1
>•.., c• c..r`}° 4#irS rH, N.,k :7;,-. 3. ^'•, w • s v • :,
it , r r s .� :y fs.'c +t� • t.r, j�;.. _u"
ryi-s~...i'''`i;: r. a irit,<t. ^ :ixK �. s":.0;;p?-' Z. W; •>Y;,,,i, / '>•;,�?''';�+• _ 'J „%: e ,t�.., . z-4 ''' :.".S
r ,. 1
7
r; • r ,
I
•
AFFIDAVIT OF SERVICE BY MAILING
State of Washington)
County of King )
Marilyn J. Petersen , being first duly sworn, upon oath
disposes and states:
That on the 29th day of July , 19 82 , affiant
deposited in the mails of the United States a sealed envelope containing
a decision or recommendation with postage prepaid, addressed to the
parties of record in the below entitled application or petition.
dei; ;)
Subscribed and sworn this ;J1 day of duly , 19
\(\MI-Ntl9.5_ -INk • thl—k)
Notary Public in and for Op Sjate of
Washington, residing at O p
Application, Petition or Case: Alterra Corporation; R-129-80
(The. mi.nufieis contain a £i,ot oil the pafc:t;i.e6 a i 1teco' d. 1
RECEIVED
Resume CITY OF RENTON
HEARING EXAMINER
`11__ 1 31982
AM PM
Richard A. Carothers, ASLA, APA, CSI71819110111112111213141516
Founder & President
Education EXHIBIT NO. /(
BLA, University of Oregon, 1960
ITEM NO. 9- ra
Registration
Washington, Oregon, Idaho, Montana, Nevada, Hawaii, Texas,Ok\ zl G€g P.
CLARB No. 163
Experience
Richard A. Carothers
Landscape Architect & Site Planner, 1960 - 1963
Richard Carothers Associates
Planners/Landscape Architects/Urban Designers, 1963 - present
Professional Affiliations �..
American Society of Landscape Architects, Past President, Washington Chapter
Washington Council of Landscape Architects, Past President
American Planning Association
Metropolitan Association of Urban Designers and Environmental Planners
Construction Specifications Institute
Canadian Society of Landscape Architects
American Arbitration Association, Advisory Board
College of Architecture and Urban Planning, University of Washington,
Advisory Board Member
American Association of Botanical Gardens and Arboreta
National Association of State Land Reclamationists ,�� tizzoYI.
�qe. c4 CirwrM t'l�.v�u�� �(�..� kAzG® ,
Public Service & Civic Organizations
King County Environmental Awards Program, Jury Member
City of Seattle Civil Service Examination Board, Member, 1966-1972
Trinity Episcopal Church, Vestry, 1976-1978
Council of Design Professions, 1977-1979 RECEIVED
HAGGARD, TOUSLEY & BRA1&
APR 291982
AM PM
Honors & Awards
National Swimming Pool Institute Award, 1969
Housing and Urban Development Award, 1970
Washington State Nurserymen's Award, 1971 (three projects) , 1973 (three projects)
American Society of Landscape Architects National Award, 1972
National Public Power Association Award, 1973
American Association of Nurserymen's Award, 1973, 1974, 1976, 1978
Associated Landscape Contractors of America Award, 1978
American Society of Landscape Architects Chapter Award, 1979
Publications
"Urban Redevelopment in Central and Northern Europe," paper presented to the
Washington State ..Conference of Land Surveyors
"The Small Town Park," Western Landscape News
"Landscape Architecture," a weekly television series
Contributions to Sunset, House & Home, Landscape Architecture, Landscape
Maintenance, Parks & Recreation, and Landscape Construction
Independent Studies & Travel
Studied urban redevelopment in Holland, Germany, Belgium, Denmark, Sweden and
Switzerland
Studied park,. recreation and open space development in Zurich, Switzerland
Studied new-town planning in Sweden
Independent travel in Central and Northern Europe, South America, North Africa,
Spain, Portugal, Alaska, Hawaii and Mexico
Lectures
Guest Speaker, Annual West Coast Conference of the National Society of Interior
Designers, Seattle, Washington
Feature Speaker, Annual Conference, Washington Society of Land Surveyors, Port
Angeles, Washington
Guest Speaker, Yakima Valley Chapter, Construction Specifications Institute,
Yakima, Washington
Guest Speaker, International Conference of Women Architects, Seattle, Washington
Guest Speaker, Rotary International, Olympia, Washington
Technical Presentation, Spring Workshop of Idaho Recreation and Park Society,
Boise, Idaho
School of Education, University of Washington, Seattle, Washington
Department of Landscape Architecture, Washington State University, Pullman,
Washington
Department of Landscape Architecture, Utah State University, Logan, Utah
EXHIBIT PTO. L
r..4e4gS._
ITEM NO. 029- u
GREEN RIVER STUDY GROUP • P.O. Box 772, Kent, Wash. 98031
July 13, 1982
RECEIVED
CITY OF RENTON
HEARING EXAMINER
JL I31982
AM PM .
A
Hearing Examiner
City of Renton
City Hall
Renton, Washington 98055
The Black River Forest has been identified as a unique
area of climax riparian forest in both the Renton Wetland
Study and the DEIS for the Black River Office Park. The
Landscape Guidelines for the project prepared by Richard
Carothers Associates that I received July 9th from Joel
Haggard make no mention of the existing vegetation or
preservation of the mature trees on the site.
On the basis of the landscape guidelines and the
testimony at the June 15th hearing, the Green River Study
Group strongly supports the recommendations of the
Environmental Review Committee to move the "preservation
area" so that it adjoins the 50 foot buffer strip near
the Black River Channel. This is the only plan put
forward to date that attempts to preserve any remnant of
the mature forest that is the unique feature of this site.
Even this proposal fails to address the issue of wildlife
habitat. Preserving significant habitat for mammals and
birds has unfortunately been ignored in the hearing to date.
Even so, the concept of a preservation area seems to us a
worthwile idea if it is applied to significant features of the
site rather than the scnub'alder on the, eastern portion of the
site.
Sincerely yours,
12A4S �. ' .
Carol Stoner '
19708 121st S.E.
Renton, WA 98055
Landscape Guidelines
•
RECEIVED
CITY OF RENTON
HEARING EXAMINER
AM
JUL 2 71982
7u8,9,ID,1Ir12p1I2 3,425 :
A
for
Black Office Park.
Renton, Washington
EXHIBIT NO. ? CQev1e11)
Alterra Corporation . ITEM NO.
by
Richard Carothers Associates July 1982
1 .01 INTRODUCTION
LANDSCAPE GUIDELINES
The landscape consists of elements that give form to exterior spaces. Thus,
the character of the landscape is created by elements such as streets and
building setbacks, the variety and placement of elements such as signing, site
lighting, walkways, and plant materials, and the arrangement of major func-
tional elements such as project entrances,. parking lots, buildings, service
areas etc.
Given that project architecture and building sites within Black River Office
Park will most likely be of varying types and sizes, landscaping as a design
element will play the key role in creating and conveying the. overall character
of Black River as a "park-like" working environment. The purpose, then, of
these Landscape Guidelines, is to provide design criteria which will help to
insure that Black River Office Park achieves an image that is distinctive,
clearly understandable and unified.
The Landscape Guidelines recognizes that the Black River Office Park consists
of three prominent zones, namely, the streetscape zone, the interior zone, and
the "preserve" zone. While the "preserve" zone is precisely as it suggests,
areas of no disturbance, an understanding of the nature of the other two zones
is important to understanding the landscape guidelines and their intent.
4°111.1.1.1111. 1111111111
r.
hIAU-IDS A�. •
�WELL A . '
.
� ; - ,,may`•. �'+.
Fa:14 LL AVM.
I NTEg-I oIZ ZoH�
•
IS
v. I.
Nau�l=5 AvM•s,W
II PI=E .1 N/ 2 7�N�
NOTE' ,¢LG 6o'ti-174 k'/LS'
Rev. 7/20/82
1 .1 Streetscape Zone
The streetscape.zone is the primary image setting zone. All improvements
within this zone will have the greatest degree of control. Attributes
within this zone include:
1. The Landscape Easement - This easement begins at the back of the
curb of the main roadway and extends inward for a distance of 30
feet along the entire length of the main roadway. The first 13 feet
minimum (including a 5 foot walk) to 24 feet maximum are designated
as a Public Parkway and shall be installed by the Developer. The
remaining 6 feet minimum to 17 feet maximum shall be a Transition
Zone to be improved by the adjacent user. Common elements within •
the Landscape Easement include walkways, planting, irrigation,
street lighting, project signing and project entries.
•
$4 H Avg• 4.W.--1 t
R au- Ave:. 'S.W.�
S�K� •��CA�� ZoHE
r-i P,K I I•I la LAf l=l el 11114
=-� SIDE of WAL t'W0(
-GLI111 L_ _ ._ IMP Bar'.11A, ma
:�� . ��-�•r. ` •J ..�� •
LINE
1• ��� • • rK 4F Gt-dfzg
M UI L
-LAW —FaIz t L
1?-a PI-ANTING
ALL LAt,11: -APING r
SIp'. WALKWAY
SHALLe.I DB PpovI g_p
BY D�v�LoP�R, Rev. 7/2(1/R9
1 .1 .1 Streetscape Zone Design Concept
The streetscape within Black River Office Park will consist of a unified
single image, namely: a single row of street trees planted approximately
5 feet from the curb line on a landscaped berm, on both sides of the main
roadway. Lawn shall occur from the curb to the walkway. Informal tree,
shrub and ground cover plantings shall occur between the walkway and the
landscape easement.
•
1Y41 4
OD OS a a
--Lo 46• to
%pygmy
IhNFof MAL FLANi l N( :
k 441\v";VA U�oUN.Dc..c>vm.R.
Individual project entries will punctuate these plantings providing
highlighted corporate identification.
A walkway will meander through the public parkway providing an added
dimension to the overall Black River streetscape scene.
gp
.414
lte
�P6 VENT
1 .1 .2 Interior Zone
The interior zone encompasses all exterior elements from the 30 foot
Landscape Easement to the building setbacks. This zone is subject to the
needs of each User and, thus, is meant to have a greater degree of flexi-
bility than the streetscape zone. Common concerns within this zone in-
clude: parking lot arrangements and landscaping, site lighting, regula-
tory and directional signing, and service area screening.
_ Y
.
Tv -
NACh-IE. AVE.'S.I,1.
1 bi4ELL Ave-54.1.
I krr R Id zc*
1 .1 .3 Interior Zone Design Concept
It is intended that the interior zone of Black River Office Park, consist-
ing primarily of parking lot landscaping, be planted in geometric patterns.
(Refer to Section 1 .2.4.b-4 for plant types.) Subtle light levels, re-
strained graphics and screening of service areas will all contribute to
reinforcing .the Black River landscape design concept.
1 .2. LANDSCAPE DESIGN GUIDELINES
1.2.1 Assessment District Installation and Maintenance Agreement
1 . All landscape improvements within the Public Parkway (Section
1 .1.1-1 ) will be installed by the Developer or successor.
2. The 30 foot Landscape Easement (Public Parkway and Transition Zone)
landscaping and irrigation will be installed as a continuous linear
system the entire length of the streetscape zone. Occasional
demolition and interruption of this system will be necessary during
the process of access drive installations. It is a responsibility
of the User to maintain the flow of the irrigation .system during
construction, and to re-establish the planting, grading and final
irrigation layout that has been interrupted.
Rev. 7/20/82
. r (,
Pg-IVklokY"
Y
• _�__ :
- II
-PQIg. i Gfi417
IST1NCa IRRkr 1
LIN�s
1 .2.2 Maintenance of Unimproved Sites
1 . Nqites that are not improved or built upon shall be maintained in a
clean and neat appearance by the User. Weeds, brush and trash will
be removed twice a year, once in the spring and once in the fall , or
more often as required to maintain a high quality appearance. The
Developer and their representative have the right to perform the
necessary maintenance and charge the individual User as neces-
sary. -
1 .2.3 Landscape Coverage
1 . A minimum of five (5) percent of the area within the property lines
of a development site shall be devoted to landscape materials unless
otherwise approved in writing by the Grantor or successors.
1 .2.4 Street Frontage Zone Design Guidelines
1 .2.4.a Definition of Street Frontage Zone
•
1. The street frontage zone is defined as that portion of the site
which is adjacent to the Landscape Easement and/or is visible from
the street. --
'::,..--;,,'...,,,,,,--s..''",`.?s:-;:s.:.... ., ','..;',':",'C.,'‘-,'s's7r•
s—TIZ.F—aT FKo 0%1•Z I- D Pg.
I MA..s ..N1...tHIT
1
1
1.2.4.b. Specific Design Limitation within the Street Frontage Zone
1 . Grading: Finish grading for each site shall meet the existing grade
of the Public Parkway boundary. Transition slope in this zone shall
not exceed 4:1 .
2. Service Areas: Service areas within this zone are to be enclosed with
solid walls and screened with the appropriate landscape material .
(Refer to 1 .2.4.b-4 for plant types. )
3. Parking: All berms within the Landscape Easement zone shall be 3 feet
minimum above the surface parking elevation within the street frontage
zone.
"1-=I I X. SLoP�
kill '-E A. I y • 111
L F-06A�. Icy
s .11
'1/
r.r.:77111
K1I ,PO. Ii4PWAY
4. Screening Shrubs: The following shrubs, in combination with walls
and/or fences, have been selected to aid in eye level screening of
service areas. Planting areas shall be a minimum width of 4 feet.
Planting areas exceeding 4 feet shall also conform to these landscape
guidelines. The shrubs should be planted at a size to achieve a
minimum height of 5 feet within a 3 year period from the date of
planting.
Plant Name Maximum Spacing • - Comments
Photinia fraseri 5 ' on center
Cotoneaster franchetii 4'
Cotoneaster lactea 4' " " •
Viburnum tinus 4' " "
Viburnum rhytidophyllum 4' "
Mahonia aquifolium 3' "
Vaccinium ovatum 3' "
Prunus lusitanica 5' " must be clipped
Arbuteus unedo 4' "
Pieris japonica 3' " "
Ligustrum japonicum 3' "
'Texanum'
Thuja occidentalis 22' "
Buxus sempervirens 3' " must be clipped
Rhododendron varieties 4' " "
1 .2.5 Parking Lot Landscape Requirements
1 .2.5.a Tree Planting Requirements
1 . Two (2)4.types of trees are identified for the parking lot planting.
(Refer o Section 1 .2.5.c for plant types.)
Type A: End of Parking Column Planting
Type B: Interior Parking Lot Planting
5I )I
l o�
u t�N
E
NP
I
::,
P .
`TY A
T
s
•
111111t !
1044401, r.
i
.............
s
1
Si
Tiz"
.::.::.
A.... ::::::::::;;::.::::,..i..:Z:4E:!:E:::Ee:ii:R..',..:::.ti•*,;:..;:ii.:••:*:::•......„::::,...;.;,,,.„i:i,..::,,,Ngijimii.„k.ft•k:,i..im:;KMM;
I
$�
� ��•
lt. lpIIINII" PLAN
U
NP 5
P
yA �:ti�t�:.>:��%i1:::vi+�i�+`� :R:".:v.`:£�iv''.?S"��::.i
r>
1:
i
>0
II � l"'
1'
' 'si".:.` .:::ii,1„...::,:......:::::2:,:i.:,:;:..i::::::i.,:::,,..,1:::,::,.v:.:...:.,:.,,:..,:..!, :... .
G:':*t��::::':.:.::::::`:�+�:�i':'y`�::`j:�':f;`n';k::'`'` ?`':;�.:::::::3i::'ti:;:::i:::::�:::::.
..,....,:i,:,,:,....,:,.„::..„::.4:...:3.;;:::.::::.„1..i:;:...„:„.„,..... .i .i.,..?!.,...„...„,..:. .k.i,::io.......i..
O
•
.
g••11�'1�'"I"�>z E LYRE PL.N rn NU
•
Type A: Type A trees shall be planted at the ends of parking columns.
A single tree specie, with a minimum height of 12 feet shall
be planted throughout the User's entire parking lot compound.
Type B: Type B trees shall be planted in the parking lot interior. A
single tree specie, with a minimum height of 8 feet shall be
planted every third stall . This tree specie may be different
in separated parking lots within the compound. Credit will
not be given for perimeter edge tree planting.
EMI7 1. GaLUMN FLIsd-rnN(1
(I) SPELi� USED
1. UlaMvt4f GoHPoUND.
D D !
0 0 • PARK I NU
y<F y:
Go
MPC>UI•!D
R r414. 1 �
�jI
I C�QI
I
441.
V .
0 , MAY VARY FfzcM
IL-1HEP�1�rY
Lvr4 # I ,2 0g3.
2. Tree wells and, planter areas within paved parking areas shall provide
a minimum 4 foot clear planting space.
3. Planting areas shall have a 6 inch curb on all sides.
41--;
rife-
Alk
. t
gile% ARM%
tit
(o'' �u�6 AlzoLiNi>
FL-ANTI NU ARF-
l , I :l
1.2.5.b Parking and Pedestrian Circulation
1 . Parking location and layout should facilitate easy and safe pedestrian
circulation.
2. If the parking layout is more than one row deep, walking space with a
minimum width of. 4 feet between stalls should be provided at key
locations.
4' 4'-rep.
i
Jr
o0
, 1114P:';*
g:staff
; 4k .'!.
` / 1,- .:
i ,ridi 0 hut, ,
-" 2 AIsLers og. Lis
3. If parking lots exceed two rows in depth, the alignment of the aisles
should be in the direction of the pedestrian movement.
4Hi'. 1,0ff ,�,,,:,; AkilE 1
��"' ..
-T% PF..PESTP-IAN1
I
GIs - - _
,r_, --- „; 1
i�44AItilirei 11,-.1
ISLE 2
- • .: 2 AISL>=s o2 Mote- .
}
1 .2.5.c Parking Lot Plant Materials List
1 . Tree species are to be selected from the following lists, unless
special soil or site conditions prevent the use of the recommended
trees.
Tree Lists for, Parking Compounds
The following lists of trees have been selected to create a park-like
appearance in the parking compound.
Type A Trees: , (End of Parking Column Planting)
Plant Name Minimum Size Comments
Acer platanoides 12' ht Limb to 6' minimum
Acer rubrum 12' ht Limb to 6' minimum
Acer pseudoplatanus 12' ht Limb to 6' minimum
Liquidambar styraciflua 12' ht Limb to 6' minimum
Tilia cordata 12' ht Limb to 6' minimum
Liriodendron tulipifera 12' ht Limb.to 6' minimum
Quercus coccinia 12' ht Limb to 6' minimum
Quercus borealis 12' ht Limb to 6' minimum
Fraxinus pennsylvanica - 12' ht Limb to 6' minimum
lanceolata
Gleditsia triacanthos 12' ht Thornless varieties only,
'Skyline' , 'Shademaster'
Type B Trees: (Interior Parking Lot Planting)
Plant Name Minimum Size Comments
Magnolia grandiflora 8' ht Limb to 42' minimum
Styrax japonica _ _. 8' ht Limb to 42' minimum
Pyrus calleryana 8' ht Limb to 42' minimum
Crataegus lavallei 8' ht Limb to 42' minimum
Crataegus phaenopyrum 8' ht Limb to 41/2' minimum
Mallus floribunda 8' ht Limb to 41/2' minimum .
Cercidiphyllum japonicum 8' ht Limb to 42' minimum
Prunus sargenti,i 8' ht Limb to 42' minimum
Prunus serrulata 8' ht Limb to 42' minimum
'Kwanzan'
Prunus subhirtella 8' ht Limb to 41/2' minimum
'Autumnal i s'
1 .2.6 Vehicular Access Drive Design Guidelines
1 .2.6.a Location Criteria
1 . Access drives for ingress and egress shall be located by the Developer
and/or User according to City of Renton standards.
3 1 .
c.gE13.,11Z.f K.F-FL-Pv--Z
5r-421-1 W/4;1 V164,4- 1-s2
4,
r tizivr4406,-( 'I, l'
••:-,:, ,„,.„,.„,
Ft-
,...„., _.
:-•,,,,,,,,,,, 4.1 15::!.:;,::!:t,,.„.
,....._, ......1
.......„.......s.;.......,.......,:............:.„....
........,. ...
.........,
. . ...... ....
. .. . „..
....:,.§....::,....:•7..,......,..! NA
•....,.:................:
.............,.„.....„_.
,...„....,..,..........,.............,.......
.. . ....,.. .. ...... s.,........,............„..,.........,...,. . ....,.. ,... .....:....:..„............,..:..„...,,,.:....„,...
..... ..... ...
... ........ .s.,.....
••••••• - .•....- -....--
M.1:::::::::::::::.::::::::::::::::i:::::.:.:.:•.11::1:.::.:::::::::.ii.::.1::::.'is.::.::::::.:.::::::.::.::,,:::1:::.'i:.s:::::1::::.1::::::i.:.:::::::.1::::•::::::::::::! 11! !!!!!!mt
cm :::: -.,:...,... =•: (("________
(
. . .
1 .2.6.b Limited Use Area at Access Drives
1 . The "limited use area" is defined as the area extending 10 feet on
either side of an access drive and in that area of the first 10 feet
extending from the curb line of the main roadway.
,ICP ILICPI‘t
14
757.777q7E7N; 1)iziv - • - - ,:',;;;Assitaity--. )
•Riii:ti:,;:mfitiimi::implimat :!.,!!"fz.,,,,, ,:,......,,,,,.__
----
ri.":1P,!1 . Ai gm] WhliTI:7 L46.EE. AREA:
1..‘,... ...-,..,..,.•...:.,:::
1 No 4D1EL4c--ria:w
NO) OVEIZ
IS
rusg:
me—, jmiliiil Fr_izm rrmi>
, tig; ill ilil
2. All objects higher than 30 inches above the top of the curb at the
access drive curb opening, including but not limited to, shrubs,
trees, signs and earth berms shall be located outside of the limited
use area.
• 1 .2.7 Guidelines for Interior Property Lines and Landscape Areas
1 .2.7.a Side and Rear Yard Requirements
1 . A 5 foot wide minimum planting zone is to be provided continuously
along and adjacent to all interior property lines.
2. All site drainage shall be directed away from the 5 foot zone.
Drainage within the 5 foot zone may flow to an adjacent area.
3. A maximum slope of 2:1 is allowed within the 5 foot planting zone. A
1 foot minimum; flat transition shall be provided at the top and bottom
of all slopes within this zone.
1 .2.7.b Plant Material Requirements - Interior Property Lines
1 . Trees: Shall be located 4 feet from curbs or 1 foot from the property
line. The trees selected for interior property lines must be species
that have been used somewhere else on the User's property. (Refer to
Section 1 .2.5.c for plant types.)
2. Shrubs: Shall be located 3 feet from the property line or 2 feet from
curbs, and planted with a maximum spacing of 5 feet on center.
3. Groundcover: . Shall be placed 24 inches on center maximum spacing,
covering all ground surfaces. If the User selects lawn as a ground-
cover, sod must be installed.
1 .2.7.c Planting and Irrigation Details and Specifications
1 . All planting and irrigation details and technical specifications shall
conform to City of Renton, Washington Design Standards and the highest
standards of the American Association of Nurserymen, the American
Landscape Contractors Association, and the irrigation industry.
2. A one year guarantee against all defects of materials and workmanship
for all planting and irrigation shall be provided for all landscape
improvements identified herein. The guarantee shall include replace-
ment of plants not in normal , healthy growing condition at the end of
the guarantee period with same species and size. -The guarantee period ._
shall begin when the Developer and/or User, or their representatives
have accepted the work as 100 percent complete.
The Developer may by deed or lease, transfer this responsibility to a
User.
4 +
1 .2.8 Guidelines for Tree Preservation Outside the "Preserve" Zone
Trees selected for preservation shall have a "tree well " (fill retaining
wall ) constructed to maintain an undisturbed existing ground area around
the tree. Provide approximately 5 sq. ft. for each caliper inch of trunk
measured at 48" above existing grade. The tree well shall be constructed
in a manner to protect all roots. No root cutting allowed. Special care
shall be taken to maintain ground water level and quality as nearly as
possible to pre-development conditions. This may include special irriga-
tion and drainage systems or culvert systems connecting the tree wells to
nearby wetlands so that the rise and fall of ground water will be similar
to pre-development conditions. Storm water may be retained on-site as
necessary or desirable to assist in maintaining ground water levels.
Tree wells shall be constructed of railroad ties (or treated timbers) with
an 8 inch high curb of timber, concrete or asphalt on all sides. Provide
hand rails where resultant depressions are more than 30 inches deep.
Conditions may vary at each tree location. Analyze each tree to ascertain
the best solution or combination of solutions to minimize adverse environ-
mental impacts.
Consult an Aborist regarding selection of trees to be preserved and preserva-
tion procedures to be used. Selected trees are subject to review and
approval by the City of Renton.
HA•NP FLAIL
Ph iz.i=C.ayl
PA•�INc� t/w g43 —
oR. PLANTINeq
811 LURb -
J
LL-
L�lA
fI -L Zoo
7� 161.
WETLANDS 1
Ca izAPa
PP-ESE=Rva) 64-31
r
G U LV�Ez'1" e Ltt-4p1 Ti-IK.BED AREA
1.4 : GI.11_VEER'T i AT ELEVATION 1� 5-T>=R1"1It- 4-J
-SITE To A L Lo L.l tzo L-IiJ D klp.-f>=R >=R-QM
A1:>--IAc-a4-11" 1-> FLok1 IN- At-E•D 0t.41-
t7F TREE. A,4 I1-1AT!✓6= Lt=mil-- F I-u 4-LATE S.
Rev. 7/20/82
4 ,
Landscape Guidelines
•
for
J1 • ick
� A (Of fflr 44).
.{1`?'st' '��.
Renton, W;.,shington
RECEIVED
CITY OF RENTON
HEARING EXAMINER
JUL 131982
mM PM
TtF;r919111dd211 a2e3.4•506
Alterra Corporation !
EXHIBIT NO. ctorp, P6p 0-1/.1
ITEM NO. - -f
by
RECEIVED
HAGGARD, TOUSLEY & BRAIN
J
AM L v Qe�h' a 2r3m, ._1.982
Richard Carothers AsSocimfes - 7i819,to,llri2r1arilaV;G 982
1
1 .01 INTRODUCTION
LANDSCAPE GUIDELINES
The landscape consists of elements that give form to exterior spaces. Thus,
the character of the landscape is created by elements such as streets and
building setbacks, the variety and placement of elements such as signing, site
lighting, walkways, and plant materials , and the arrangement of major func-
tional elements such as project entrances, parking lots, buildings, service
areas etc.
Given that project architecture and building sites within Black River Office
Park will most likely be of varying types and sizes, landscaping as a design
element will play the key role in creating and conveying the overall character
of Black River as a "park-like" working environment. The purpose, then, of
these Landscape Guidelines , is to provide design criteria which will help to
insure that Black River Office Park achieves an image that is distinctive,
clearly understandable and unified.
The Landscape Guidelines recognizes that the Black River Office Park consists
of three prominent zones, namely, the streetscape zone, the interior zone, and
the "preserve" zone. While the "preserve" zone is precisely as it suggests ,
areas of no disturbance, an understanding of the nature of the other two zones
is important to understanding the landscape guidelines and their intent.
,
C-----lir
PegWELL AvF-.s.1..1
5'T1zEET APE z1>1a1a.
•
iCi7'' ••`......i.•.
-.11.4.4fol,,,,...t.,,4.•,.1. ,..t.,v,fip.v.:3f441,t,,,,.4.,-„,„: :.,..,- , -_.,..,.,.
fi
ti0 d' �,II t•rt, ` rt
,11,. .0`^`'.'i'v is�:,;-
H .H65. AVE. '5.W.-IeN
P-w L. Aim.. .5.id. /1
1 NTEfz IoK Zl>N.
•
+;i`, ;i' ;irk°rila;i40',.r.- 11
:{.,:;.-`:
�wr-LLr . .5.W. iI.
i'K ..SE-RV Z
1 .1 Streetscape Zone
The streetscape zone is the primary image setting zone. All improvements
within this zone will have the greatest degree of control . Attributes
within this zone include:
1 . The Landscape Easement - This easement begins at the back of the
curb of the main roadway and extends inward for a distance of 30
feet along the main roadway. The first 13 feet minimum (including
a 5 foot walk) to 24 feet maximum are designated as a Public Park-
way and shall be installed by the Developer. The remaining 6 feet
minimum to 17 feet maximum shall be a Transition Zone to be improved
by the adjacent user. Common elements within the Landscape Easement
include walkways, planting, irrigation, street lighting, project
signing and project entries.
.......mb.\\
N H Aug.. S.W..
F 14..L-1- Ava..S.W. /\
- -nzF_ TSG..0N,Pa Zl>f•l!
1 [1; .�K-1 N<a 744_1_ LAND`.�AF 1 F `fl-{IS
SIDE of WALKWAY +-
I a MN. iE Piz !PPP B`( u ss=�
o '-1 .� f
-A ° reirt-Emiallft* 'Nit- - 4..„.• . Er oi•
-11114011u4N4
. •)Q ;-.R \it �' l.l1J�
..l .�� -K. t�F Lam�s\!3 G
.L%" "'4,m4 v' e ' �'hAr, ,Imo„ -4,_%.-A Jof.- 141 Itc)ir
SG es' MW4. -
1-AkIK1 FotZ ti L S-- ET
"fr-aE PLANTING
ALL I-A1Jb1--r-APINc -i-HIS
SIPE. WALKWAY
L I h1 DI KIU WALKWAY) -SNA.LL. Be. PF-0vI P=P klr�
tp .P' E M r..INIT
_ BY P.pva—c)P.IZ,
1 .1 .1 Streetscape Zone Design Concept
The streetscape within Black River Office Park will consist of a unified
single image, namely: a single row of street trees planted approximately
5 .feet from the curb line on a landscaped berm, on both sides of the main
roadway. Lawn shall occur from the curb to the walkway. Informal tree,
shrub and ground cover plantings shall occur between the walkway and the
landscape easement.
.fin✓A
ip
Tiig: NY• (Pt 41r
`� v'1-n# 0 0 ' WOO. it . 1 '-'1 .--"T -r-g- E-
4a-ov'aA.o4
�i 9n� Al elipp; II 1Folzf4 .L FLAW]Nct
6
Individual project entries will punctuate these plantings providing
highlighted corporate identification.
A walkway will meander through the public parkway providing an added
dimension to the overall Black River streetscape scene.
11
!? .
gym
A NI
a I 4
LAH P1- e-A.P . A VENT
•
•
1 .1.2 Interior Zone
The interior zone encompasses all exterior elements from the 30 foot
Landscape Easement to the building setbacks. This zone is subject to the
needs of each User and, thus, is meant to have a greater degree of flexi-
bility than the streetscape zone. Common concerns within this zone in-
. clude: parking lot arrangements and landscaping, site lighting, regula-
tory and directional signing, and service area screening.
•
4 1d'uk• •'i•..•
k
dg-1t ,.,'ilt.,
N AU-1�i AvE."S.W.
F 1Eu. Avg.. S.W..—
I NT .0.I to FR ZONE
1 .1 .3 Interior Zone Design Concept
It is intended that the interior zone of Black River Office Park, consist-
ing primarily of parking lot landscaping, be planted in geometric patterns.
(Refer to Section 1 .2.4.b-4 for plant types.) Subtle light levels, re-
strained graphics and screening of service areas will all contribute to
reinforcing the Black River landscape design concept.
1 .2. LANDSCAPE DESIGN GUIDELINES
1 .2.1 Assessment District Installation and Maintenance Agreement
1 . All landscape improvements within the Public Parkway (Section
1 .1 .1-1 ) .will be installed by the Developer or successor.
•
2. The 30 foot Landscape Easement (Public Parkway and Transition Zone)
landscaping and irrigation will be installed as a continuous linear
system. Occasional demolition and interruption of this system will
be necessary during the process of access drive installations. It
• is a responsibility of the User to maintain the flow of the irriga-
tion system during construction, and to re-establish the planting,
grading and final irrigation layout that has been interrupted.
1 � 1
N-WAY
'a-' ! %',i.T`n '•J-71- si.;>'.�5: �;i',ttcc'Lt'� •i11••'1:!.;
_ uFi�f�' •r. 'l �= 11 ,.iv?fi_•.•; ' /�••,•U t
s. .y • 1 i`i�y' .•c' t'c.
�vt/' vi: '� : ,. ,. . ' � �i"{��n�.;, �'fi;�'A't
t
':r tai. ••",: �
pis-r1 !my ,
LIN�s
1 .2.2 Maintenance of Unimproved Sites
1 . ,ites that are not improved or built upon shall be maintained in a
clean and neat appearance by the User. Weeds, brush and trash will
be removed twice a year, once in the spring and once in the fall , or
more often as required to maintain a high quality appearance. The
Developer and their representative have the right to perform the
necessary maintenance and charge the individual User as neces-
sary.
1 .2.3 Landscape Coverage
1 . A minimum of five (5) percent of the area within the property lines
of a development site shall be devoted to landscape materials unless
otherwise approved in writing by the Grantor or successors.
1 .2.4 Street Frontage Zone Design Guidelines
1 .2.4.a Definition of Street Frontage Zone
1 . The street frontage zone is defined as that portion of the site
which is adjacent to the Landscape Easement and/or is visible from
the street.
•
:fk . .. 1-AND_ P�
YARDS
I I
.1
1 .2.4.b Specific Design Limitation within the Street Frontage Zone
1 . Grading: Finish grading for each site shall meet the existing grade
of the Public Parkway boundary. Transition slope in this zone shall
not exceed 4:1 .
2. Service Areas: Service areas within this zone are to be enclosed with
solid walls and screened with the appropriate landscape material .
(Refer to 1 .2.4.b-4 for plant types. )
3. Parking: All berms within the Landscape Easement zone shall be 3 feet
minimum above the surface parking elevation within the street frontage
zone.
4:ItAkc 41-043s
1
t A' 1/4 )41
S UI1P
YAKKING• . L1 ,p1r. _
4. Screening Shrubs: The following shrubs, in combination with walls
and/or fences, have been selected to aid in eye level screening of
service areas. Planting areas shall be a minimum width of. 4 feet.
Planting areas exceeding 4 feet shall also conform to these landscape
guidelines. The shrubs should be planted at a size to achieve a
minimum height of 5 feet within a 3 year period from the date of
planting.
Plant Name Maximum Spacing Comments
Photinia fraseri 5 ' on center
Cotoneaster franchetii 4' "
Cotoneaster lactea 4' • " "
Viburnum tinus 4' " "
Viburnum rhytidophyllum 4' " "
Mahonia aquifolium 3' "
Vaccinium ovatum 3' " "
Prunus lusitanica 5' " must be clipped
Arbuteus unedo 4' " "
Pieris japonica 3
Ligustrum japonicum 3' " "
'Texanum'
Thuja occidentalis 231' "
Buxus sempervirens 3' " must be clipped
Rhododendron varieties 4' " "
•
1 .2.5 Parking Lot Landscape Requirements
1 .2.5.a Tree Planting Requirements -
•
1 . Two (2) types of trees are identified for the parking lot planting.
(Refer to Section 1 .2.5.c for plant types. )
Type A: End of Parking Column Planting
Type B: Interior Parking Lot Planting
5' 9'
•
::........
t:,.t
Ut-�l N :..:.:.
r
`i:2:+'
:v.
:... ......ni'>:'.: 3..,::}fix �"
P A
S
:Q
1>
i
./0 4 1:i.t .:..:-!: .....,....,...
.:.....:.. fs`
t. AS
x. .
.. . .: ..
'''''. '5''!:A.. M:2.',.: ni'k]0'.%..t.i.:,.,qi`k.':'.t?':i.t: 44,'4.,WiM ''''.i
•'416,''';.,''''..::::.:Vi::.... :::i'..,:'..4fihr.•.:;':..7..10-1....‘ , '.-joup."%lelk.
'i . 711'
•
P �IM -Iz FLAN7INla
•
Grl�U MN SNP 5 °9 � �,;> : `' s ;�..
i t _ ;x .:r
r
A
3.:• :
2:
H
3
....... • ;;jar<<.>�>.?:`: :
:.'tr
�f
'•
t.
ittu
.
is.
. viegir-Aur _ .111
•
� -�I M�-i � E�E PI-AhiTIN41
Type A: Type A trees shall be planted at the ends of parking columns.
A single tree specie, with a minimum height of 12 feet shall
be planted throughout the User's entire parking lot compound.
Type B: Type B trees shall be planted in the parking lot interior. A
single tree specie, with a minimum height of 8 feet shall be
planted every third stall . This tree specie may be different
in separated parking lots within the compound. Credit will
not be given for perimeter edge tree planting.
E#.ip pp" C.oLut-1-4 FL-M l N61
-`ti '� :(,I) usi
11-IRot-I6alloi.rT HPot. -D.
IIg2gf
I I
Q 0 PATZK I I I-�
GoMPG,L W47
II-117 �lo PL�.NTI NC3 I
t
SP
MAY vAtiz-r FILM
DINE
2. Tree wells and planter areas within paved parking areas shall provide
a minimum 4 foot clear planting space.
3. Planting areas shall have a 6 inch curb on all sides.
111.
I-1 ,, -i
TVI
FLAA,
otam, .00
im. may.' -
[VI' liurt5 A.RpuI
PI. NrI NU AST
i
1 .2.5.b Parking and Pedestrian Circulation
1 . Parking location and layout should facilitate easy and safe pedestrian
circulation.
2. If the parking layout is more than one row deep, walking space with a
minimum width of 4 feet between stalls should be provided at key
locations.
4'-r-,ry 4'-'
Ilk y r , w&L ,48.Y
I., ztvital
L .
Ilir
2 AI4LV..-s LDS
3. If parking lots exceed two rows in depth, the alignment of the aisles
should be in the direction of the pedestrian movement.
•--... , 410. , o : is,ist_a. 1
I % FF--PETIZI.64-1T%
l•- CZ,IZIZI Pc:RS
''' ik AIM i'
.. -77-1 4>41Ik Ilik Olk-I� 140 AISL . 2
T
1 .2.5.c Parking Lot Plant Materials List
1 . Tree species are to be selected from the following lists, unless
special soil or site conditions prevent the use of the recommended
• trees.
'Tree Lists for Parking Compounds
The following lists of trees have been selected to create a park-like
appearance in the parking compound.
Type A Trees: (End of Parking Column Planting)
Plant Name Minimum Size Comments
Acer platanoides 12' ht Limb to 6' minimum
Acer rubrum 12' ht Limb to 6' minimum
Acer pseudoplatanus 12' ht Limb to 6' minimum
Liquidambar styraciflua 12' ht Limb to 6' minimum
Tilia cordata 12' ht Limb to 6' minimum
Liriodendron tulipifera 12' ht Limb•to 6' minimum
Quercus coccinia 12' ht Limb to 6' minimum
Quercus borealis 12' ht Limb to 6' minimum
Fraxinus pennsylvanica 12' ht Limb to 6' minimum
lanceolata
Gleditsia triacanthos 12' ht Thornless varieties only,
'Skyline' , 'Shademaster'
Type B Trees: (Interior Parking Lot Planting)
Plant Name Minimum Size Comments
Magnolia grandiflora 8' ht Limb to 41/2' minimum
Styrax japonica 8' ht Limb to 41/2' minimum
Pyrus calleryana 8' ht Limb to 42' minimum
Crataegus lavallei 8' ht Limb to 41' minimum
Crataegus phaenopyrum 8' ht Limb to 41/2' minimum
Mallus floribunda 8' ht Limb to 41/2' minimum .
Cercidiphyllum japonicum 8' ht Limb to 42' minimum
Prunus sargentii 8' ht Limb to 42' minimum
Prunus serrulata 8' ht Limb to 41' minimum
'Kwanzan'
Prunus subhirtella 8' ht Limb to 41/4' minimum
'Autumnalis'
1 .2.6 Vehicular Access Drive Design Guidelines
1 .2.6.a Location Criteria
1.. Access drives for ingress and egress shall be located by the Developer
and/or User according to City of Renton standards.
c.,iZE-13641
IZ 4 E 'LA►c-�
I�/4;1 f•414)(-&2
tR1 - r *
.,,, "
„„;;,,,,,:.
,.:,,,, „,„
- -,,,„i: _, ",:;„:„,„ - it
(_____
1 .2.6.b Limited Use Area at Access Drives
1 . The "limited use area" is defined as the area extending 10 feet on
either side of an access drive and in that area of the first 10 feet
extending from the curb line of the main roadway.
lb' Ol
it
YS x
R'
Sa oa
t^
alft II'Et ''' 4ii i‘t:".:1! LIt-lel, U6.a.Alz.E.0^4:
•
- 2. All objects higher than 30 inches above the top of the curb at the
access drive curb opening, including but not limited to, shrubs,
trees, signs and earth berms shall be located outside of the limited
use area.'
1 .2.7 Guidelines for Interior Property Lines and Landscape Areas
1 .2.7.a Side and Rear Yard Requirements
•
1 .. A 5 foot wide minimum planting zone is to be provided continuously
along and adjacent to all interior property lines.
2. All site drainage shall be directed away from the 5 foot zone.
Drainage within the 5 foot zone may flow to an adjacent area.
3. A maximum slope of 2:1 is allowed within the 5 foot planting zone. A
1 foot minimum flat transition shall be provided at the top and bottom
of all slopes within this zone.
1 .2.7.b Plant Material Requirements - Interior Property Lines
1 . Trees: Shall be located 4 feet from curbs or 1 foot from the property
line. The trees selected for interior property lines must be species
that have been used somewhere else on the User's property. (Refer to
Section 1 .2.5.c for plant types.)
2. Shrubs: Shall be located 3 feet from the property line or 2 feet from
curbs, and planted with a maximum spacing of 5 feet on center.
3. Groundcover: Shall be placed 24 inches on center maximum spacing,
covering all ground surfaces. If the User selects lawn as a ground-
cover, sod must be installed.
1 .2.7.c Planting and Irrigation Details and Specifications
1 . All planting and irrigation details and technical specifications shall
conform to City of Renton, Washington Design Standards and the highest
standards of the American Association of Nurserymen, the American
Landscape Contractors Association, and the irrigation industry.
2. A one year guarantee against all defects of materials and workmanship
for all planting and irrigation shall be provided for all landscape
improvements identified herein. The guarantee shall include replace-
ment of plants not in normal , healthy growing condition at the end of
the guarantee period with same species and size. The guarantee period
shall begin when theiJeveloper and/or User, or their representatives
have accepted the work as 100 percent complete.
The Developer may by deed or lease, transfer this responsibility to a
User.
� 1
EXHIBIT NO. gRE
RE
CEIVED
1 ITEM NO. /M-V .CI Y OFING NTON
NER
2 AM JUL 121982
3 PM
7I iI10,11'1211,2,3,415 6
4 BEFORE THE HEARING EXAMINER
5 OF THE CITY OF RENTON
6
REGARDING BLACK RIVER ) NO. R-129-80'
7 OFFICE PARK )
) APPLICANT' S SUPPLEMENTAL
8 ) MEMORANDUM
9 )
10
The Examiner has scheduled applicant' s appeal on
• 11
the ERC conditions for the subject property coincident
12
with the conclusion of the rezone hearing. The purpose of
13
this memorandum is to provide applicant' s position on the
14
ERC appeal and to provide supplementary comments upon the
15
rezone.
16
17
Appeal of ERC Conditions
18
19 An EIS was prepared for the total proposal, re-
zone and subsequent development. Subsequently applicant
20
tendered to the City on May 25, 1982 additional conditions
21
as part of our total proposal. On May 28, 1982 the ERC
22
23 imposed four conditions on the total proposal, from which
24 this appeal was taken. Our specific concerns and sug-
25 Bested resolutions follow.
26 Conditions l,a. We understand that as of July 1,
27 1982 the P-1 channel project sponsorship underwent signifi-
28 cant change. The predictability that the P-1 channel, as
APPLICANT'S SUPPLEMENTAL HAGGARD,TOUSLEY&BRAIN
MEMORANDUM 1 ATTORNEYS AND COUNSELORS AT LAW
1700 DAON BUILDING
720 OLIVE WAY
SEATTLE,WASHINGTON 98101
624-5299
1 it hasbeen discussed, would be built maybe open to doubt .
2 We had previously agreed to dedicate a portion of the pro-
perty to Renton for the P-1 channel. use. , Due to the
4. change, it appears more appropriate not to dedicate the
5 P-1 channel area now but rather to .put .a non-building de-
•
6 signation upon it. If it turns out that the area is at
7 some, future time to be used by ,a governmental agency for a
8 flood control and storm drainage project, applicant. is
9 still willing to dedicate the property. Accordingly we
10 recommend Conditions l.a .be revised to read:•
,
11 "The area identified as P-1 in Exhibit
shall not have any structures other than for
12 flood control or' storm drainage constructed
within its boundaries. "
13
Conditions. 'l. b' and l. c. We simply do not under-
14
stand the City' s position and the ERC has no authority
15
under RCW; 43.21C.060 to impose this condition. The City
16
has no adopted resolution, regulation, ordinance, plan or
17
code providing specific authority for such conditions.
18
However, applicant has voluntarily agreed to preserve or
19
dedicate certain areas, within the property (designated
20 . .
Preserve or City ,of.. Renton .on Exhibit ) and substitu-
21
tion of. these for the ERC language is not objectionable.
22 '
Condition 2. As articulated above in "Condition
23 .
l..b and l. c" the ' ERC has no authority pursuant to RCW
24
25 43 ..21C.06.0 to impose this condition. We are aware that as
26 a result of the testimony of Mr. Jerry Rasmussen (Entranco) ,
27 the ERC on. June 30, 1982 changed its position. The ERC' s
revised position appears to generally concur with
28
APPLICANT 'S SUPPLEMENTAL
MEMORANDUM '. ' 2
1 applicants. However, we will need to explore with the
2 appropriate ERC representative at the hearing certain
3 questions on interpretation of its revised condition
4' before being able :to withdraw this point of dispute..
5 Conditions 3 and 4. Initially, it may be appro-
6 priate to simply dismiss this appeal without prejudice and
7 allow applicant (or its successor) to challenge these con-
8 ditions at the time specific development proposals are
9 made. For, at this point in time no development is pro-
m posed and the issues may be premature. However, the ap-
11 peal was filed due to the time period within which appeals
12 had to, be filed to avoid applicant foregoing its rights.
13 This approach appears consistent with the Ex-
14 aminer' s approach in Earlington Park ( See File PP-056-80,
15 Examiner' s Report of April 28, 1982 at page' 14, para. 11) .
16 Assuming that the Examiner does not wish, to post-
17 pone the appeal until it is ripe, further comments are
18 provided here.
19 Condition 3a . This condition is beyond the ERC ' s
20 authority pursuant to RCW 43 .21C.060. Additionally, this
21 condition is directly prohibited by recent state law. See
22 Section 5, ESB 4972 (Copy attached) .
23 Conditions 3b and 3c . No objection is made •
24 except as to the words " . . .established by 3a and 3b
25 above. . . " in the third line of Condition 3c.
26 • Condition 4 . Same objection as to Condition 3a.
27
28
APPLICANT' S SUPPLEMENTAL
MEMORANDUM ,
1 Rezone Hearing
2 As noted above regarding Conditions l.a and 2 , we
3 will want to clarify with ERC staff the current situation
4 and any potential ambiguities.
5
6
Respectfully Submitted,
7
HAGGARD TOUSLEY & BRAIN
8
9
el a and
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
APPLICANT 'S SUPPLEMENTAL
MEMORANDUM 4
n
_ _____
T It
. , r,...:46.7) .5.;...,A,.,+7:6 .--...
P,i s4 s<< E 75-- 2 //. i
(::) ENGROSSED SENATE BILL NO.0972 v.I L Y`�
State of Washington By Senator Zimmerman 7 f 0 LJ
1982 First Special Session (�;
47th Legislature
Read first time February 2, 1982,and referred to Committee on LOCAL
GOVERNMENT. I
•
O1 AN ACT Relating to local government finance; amending section 4,
2 chapter 94, Laws of 1970 ex. seas. and RCM 82.14.030;
. 3 amending section 5, chapter 94, Laws of 1970 ex. sess.
4 and RCW 82.14.040; amending section 1, chapter 87, Laws `'
5 of 1972 ex. seas. as last amended by section 4, chapter
6 175, Laws of 1979 ex. seas. and RCW 82.44.150; amending
7 section 8, chapter 134, Laws of 1972 ex. sess. as last I'
:I
8 amended by section 6, chapter 144. Laws of 1981 and RCW 1
9 35.21.710; adding new sections to chapter 35.21 RCN; !t`
10 adding ,new sections to chapter 82.14 RCW; adding a new '
11 - chapter to Title 82 RCW; creating new sections; providing
12 an effective date; and declaring an emergency. ,i`
13 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON: `r
Q14 NEW SECTION. Section 1. The legislature hereby
15 recognizes the concern of local governmental entities regarding
18 the financing of vital services to residents of this state. The
17 legislature finds that local governments are an efficient and
_ 18 responsive means of providing these vital services to the +'
19 citizens of this state. It is the intent of the legislature
' 20 that vital services such aspublic safety, I%public health, and
C) 21 fireprotection be recognized byall local �`.� g governmental entities
22 in this state as top
priorities of the citizens of Washington. I'
23 NEW SECTION. Sec. 2. (1) No city or town may impose a I ' '
24 franchise fee or any other fee or charge of whatever nature or Ir
. S l
25 description upon the light and power, telephone, or gas I IT
1
28 distribution businesses, as defined in RCW 82.16.010. except
27 that (a) a tax authorized by section 3 of this act may be 4
28 imposed and (b) a tee may be charged to such businesses that
•1. ESB 4972 .
•
il
'1
t
V `
*- - .
ti
. t
Sec. 5
' 1 beginning October 1st of the previous year and ending September '
2 30th of the current year less the increase in the Seattle All
1 1..3 Urban Consumer Price Index for the same period, multiplied by
4 the then current tax rate or (b) one-fifth the difference �'
5 between the tax rate on the effective date of this section and
6 six percent. If the amount determined under (b) of this 1
7 subsection is less than the amount determined under (a) of this
8 subsection, then one-half of the difference between the amounts
-* 9 determined under (a) and (b) of this subsection shall be added ,r
- 10 to the amount determined under (a) of this subsection in the .. r
1 7
11 following year. -
12 As used in this subsection. 'weighted average increase in i 4•
. 13 utility rates' means the percentage increase in utility revenues • �1
T kt
14 for each utility expected from application of increases in rates 1 x
. . • 15 based on the previous year's revenues and service areas within , P
- 16 each city or town. '';
_ 17 Nothing in this subsection prohibits a city or town from 4
- 18 reducing its rates by amounts greater than the amounts required ' i',
19 in this subsection. „
20 Voter approved rate increases under subsection (1) of T
�': (7) 21 this section shall not be included in the computations under k-'
22 this subsection.
23 Sec. 5. Section 82.02.020, chapter 15. Laws of 1961 as r.
24 last amended by section 3, chapter 196, Laws of 1979 ex. sess.
25 and RCW 82.02.020 are each amended to read as follows:
26 Except only as expressly provided in RCW 67.28.180 and k t
•• :27 67.28.190 and the provisions of chapter 82.14 RCM, the state i
' 28 preempts the field of imposing taxes upon retail sales of yc.
29 tangible personal property, the use of tangible personal
• 30 property, parimutuel wagering authorized pursuant to RCW dx
i• 31 67.16.060, conveyances, and cigarettes, and no county, town, or
32 other municipal subdivision shall have the right to impose taxes V
• 33 of that nature. No county, city, town, or other municipal ga
f
I
rr
34 corporation shall impose any tax, fee, or charge. either direct
i
35 or indirect, on the construction or reconstruction of
} EY
I -3- FS© 4972 4
't )f i
-
t R
,
•
/.-- (::) 1 4.'
residential buildings, commercial buildings, industrial is
2 buildings, or on any other building or building space or
3 appurtenance thereto, or on the development, subdivision, I I _=
k i , ,
- 4 classification, or reclassification of land. However, this I •.
5 section does not preclude dedications of land or easements H� ,t''
x.
6 pursuant to RCM 58.17.110 within the proposed development or 3
7 plat which the county, city, town, or other municipal ! .114
8 corporation can demonstrate are reasonably necessary as a direct 0 i
i ;k4'
k9 result of the proposed development or plat to which the I, It
II tf
,, 10 dedication of land or easement is to apply. I; sy
11 This section does not prohibit voluntary agreements with i ?1;`',;
12 counties, cities, towns, or other municipal corporations that ` Ili 1
13 allow a payment in lieu of a dedication of land or to mitigate •
a i
been identified as a consequence of a 'h * h+
14 direct impact that has IS ),'
. 15 proposed development, subdivision, or plat: PROVIDED, That any 1 r ,
16 such voluntary agreement shall be subject to the following I
17 provisions:
r ,(
18 (1) The payment shall be held in a reserve account and i
19 may only be expended to fund a capital improvement agreed upon I; t
r .
20 by the parties to mitigate the identified, direct impact; j
21 (2) The payment shall be expended in all cases within ( {
22 five years of collection; and
•
er
23 (3) Any payment not so expended shall be refunded with i i s
24 interest at the rate applied to judgments to the property owners I+ L.
,
25 of record at the time of the refund; however, if the payment is !: . ti
t±
• 26 not expended within five years due to delay attributable to the f• `,
27 developer, the payment shall be refunded without interest. k {
. 28 No county, city, town, or other municipal corporation (i r
29 shall require any payment as part of such a voluntary agreement
i V 30 which the county, city, town, or other municipal corporation i,
' 31 cannot establish is reasonably necessary as a direct result of I�
4.
32 the proposed development or plat. 1 c
` 33 Nothing in this section prohibits cities, towns, 1 ; {
34 counties, or other municipal corporations from collecting k
.* 35 reasonable fees from an applicant for a permit or other
36 governmental approval to cover the cost to the city, town, ;
' z E5B 4972• -4- {i
>
•
• it , ;` i
` i
. t
. . , ,f
e
Sec. 7
1 county, or other municipal corporation of processing
2 applications, inspecting and reviewing plans, or preparing
:
3 detailed statements required by chapter 43.21C RCW. ,
i•
4 This section does not limit the existing authority of any
5 county, city, town, or other municipal corporation to impose i
6 special assessments on property specifically benefitted thereby
, .(2)1 7 in the manner prescribed by law.
8 Nothing in this section prohibits counties, cities, or
9 towns from imposing p g or permits counties, cities, or towns to
• 10 impose water, sewer, natural gas, drainage utility, and drainage ,• j
11 system charges: PROVIDED, That no such charge shall exceed the
A . '
12 proportionate share of such utility or System's capital costs
13 which the county, city, or town can demonstrate are attributable I
1
14 to the property being charged: PROVIDED FURTHER, That these i
:Z. 15 provisions shall not be interpreted to expand or contract any a
Ik 16 existing authority of counties, cities, or towns to impose such
17 charges.
r
• Y 18 This section does not apply to special purpose districts y
19 formed and acting pursuant to Titles 54, 56, 57, or 87 RCW, nor I' }
s 20 is the authority conferred by these titles affected. i
0 21 NEW SECTION. Sec. 6. Nothing in this act precludes the
x 22 imposition of business and occupation taxes by cities and towns, t
`1 t
23 or of sales and use taxes. However, nothing in this act s
I r
24 authorizes the imposition of a business and occupation tax by
a
25 any county. a
N.
26 Sec. 7. Section 6, chapter 134, Laws of 1972 ex. sess. 4 ';
27 as last amended by section 6, chapter 144, Laws of 1981 and RCW h t
r
28 35.21.710 are each amended to read as follows: .1
' 29 Any city which imposes a license fee or tax upon business
et
30 activities consisting of the making of retail sales of tangible . ;t le
31 personal property which are measured by gross receipts or gross
32 income from such sales, shall impose such tax at a single ' f •
33 uniform rate upon all such business activities. The taxing q
34 authority granted to cities for taxes upon business activities
35 measured by gross receipts or gross income from sales shall not '
5' ESD 4972 ..i
. • . .+
'f
1
.. RECEIVED''. .
`, CITY OF RENTONd7
HEARING EXAMINER '
2.
_ ram•. AM JUN 151982
March 7, 1977 '�
PM
- 71819110,11,1211,2,314,5,6
Ai ANNUAL PEAK DISCHARGES - GREEN RIVER
12104500 12105800 12105900 12113000 1213350
Green R. Howard A. Green R. Green R. Green R.
Near Hanson Below Near At
Lester Reservoir Howard A. Auburn Tukwila
Near Palmer Hanson Dam ,
Water v
Year QP (cfs) Date Storage (AF) Date QP (cfs) ' Date QP (cfs) Date QP (cfs) Date
1936 - - . - - - - - _ - _
1937 - - - - - - 6,820 4/15 - -
1938 - - - - - - 14,400 4/18 - -
. 1939 - - - - - 5,420 12/8 - -
1940 - - - - - - .5,150 2/10 - -
1941 - - - - - - 7,290 11/29 - -
1942 - - - . - - - 9,310 12/19 - -
1943 - - - - - - 10,900 11/23 - -
' 1944 - - - - - - 12,900 12/3 -
1945 - - - - - - 13,600 1/7 - -
1946 4,010 12/28 - - - - 12,800 12/29 - -
1947 9,200 12/11 - • - - - 22,000 12/11 - -
1948 3,660 11/8 - - - - 8,960 11/8 - -
1949 2,840 5/13 - - - - 9,470 2/17 - -
1950 3,610 11/27 - - - - 11,800 3/4 - -
1951 4,790 2/9 - - - - 18,400 2/10 - -
1952 1,680 4/19 - - - - 6,280 2/4 - -
1953 4,990 1/31 - - - - 13,400 2/1 - -
•
'XHIBIT NO. 7
•
iTEM NO. K /27- go
ANNUAL PEAK DISCHARGES - GREEN RIVER
12104500 12105800 12105900 12113000 1213350
Green R. Howard A. Green R. Green R. Green R.
Near Hanson Below Near. At
Lester Reservoir Howard A. Auburn Tukwila
Near Palmer Hanson Dam V
Water
Year AQ (cfs) Date Storage (AF) Date QP (cfs) Date QP (cfs) Date QP (cfs) Date-
1954 6,020 12/9 - - - - 18,300 12/10 - -
1955 5,280 2/8 - - - - 15,500 2/8 - -
1956 7,630 12/12 - - - - 20,300 12/12 - -
1957 7,400 12/9 - - - - 13,900 12/10 - -
1958 2,860 4/20 - - - - 5,780 4/20 - -
1959 6,840 11/12 - - - - 15,900 11/13 - -
1960 22,000 11/22 - - - - 28,100 11/23 - -
1961 3,620 2/21 - - 12,200 2/21 13,000 2/21 11,500 2/22 . p/914 Q u11-- T
1962 4,980 4/6 11,970 4/6 9,630 1/8 9,510 1/3 9,080 1/4
1963 6,550 11/20 5,190 11/20 8,850 11/20 8,020 11/21 8,410 11/21
1964 2,350 6/1 1,530 6/1 5,050 1/1 6,250 1/2 6,000 1/2
1965 9,110 1/29 21,230 1/29 10,600 2/1 11,400 , 1/29 12,100 1/31
1966 2,070 5/6 7,840 5/6 4,820 5/5 4,900 5/6 4,910 5/6
1967 2,610 1/15 739 1/15 6,470 1/15 7,580 1/15 7,310 1/16
1968 7,160 12/25 4,920 12/25 9,150 12/26 8,870 2/20 9,210 1/21
1969 3,550 1/5 1,990 1/5 7,510 1/6 9,210 1/6 9,750 • 1/6
1970 2,030 1/23 751 i/23 6,390 1/6 7,080 1/21 7,350 1/23
-2-
�,'
t
(
ANNUAL PEAK DISCHARGES - GREEN RIVER
12104500 12105800 12105900 " 12113000 1213350
Green R. Howard A. Green R. Green R. Green R.
Near Hanson Below Near At
Lester Reservoir Howard A. Auburn Tukwila
Near Palmer Hanson Dam I
Water
Year QP (cfs) Date Storage (AF) Date. QP (cfs) Date " QP cfs) Date QP (cfs) Date
1
S
1971 4,510 1/30 849 1/30 8,550 1/31 . 8,840 1/31 8,960 2/1
1972 5,560 2/16 1,930 2/16 8,5,70 2/17 9,260 2/17 10,100 3/2
1973 4,590 12/21 3,610 12/21 7,210 12/22 9,900 12/22 8,340 12/28
1974 5,380 1/15 527 1/15 9,660 1/18 . 10,200 1/18 10,300 1/18
1975 8,360 1/18 16,110 1/18 8,460 1/21 9,820 1/18 9,340 1/18
1976 12,300 12/2 61,325 12/5 10,700 12/6 12,100 12/7 12,000 12/7
olon hr3 1145brs /115hri 1 /530 Ars
53,268 12/6
39,802 12/7
•
•
-3-
iliiiiw°
OF R4,
° PUBLIC WORKS DEPARTMENT
�3-
_ TRAFFIC ENGINEERING DIVISION • 235-2620
1.
0 111110 MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.98055
9 ro•
Q v9�rE0 SEPS-�O�
BARBARA Y. SHINPOCH
MAYOR August 7, 1981
TO : David Clemens, Acting Planning Director
FROM: Richard C. Houghton, Acting Public Works Director
SUBJECT: Black River Office Park
Please be advised that David Markley of The Transpo Group, Bob Thorpe of R. W.
Thorpe & Associates, Gary Norris and myself met to discuss the EIS for the
subject proposal .
From that meeting, we determined that the best approach would be a document
which addressed the overall traffic impacts of the range of possible developments
on that parcel of land. From such an analysis, we believe that we can develop
a "feel" for the appropriate scale for the proposed development.
When a definite proposal is secured for that parcel of land, the developer will
be required to do an in-depth traffic operational study to define problem areas
and offer measures of mitigation. This analysis will involve all critical
intersections within an area defined by FAI 405 on the south, Sunset Highway
on the north, Rainier Ave. on the east and West Valley Highway on the west.
The above should be placed as a condition for all permit processes regarding this
parcel of property.
If you have any questions, please contact Gary Norris. Thank you.
•
GAN:ad
cc: LDavid Markleyf '1!`'{�'
Bob Thorpe_
Clint Morgan
RECEIVED
CITY OF RENTON
HEARING EXAMINER
JUN 151982
AM PA4 EXHIBIT NO.
718i0110111a1211 i2131415►f
ITEM NO. -
DAVID D. MARKLEY
The. TRANSPO Group .
Professional Status
Mr. Markley is a co-founder and officer of The TRANSPO Group. He has full
technical and administrative responsibility for a wide variety of traffic engineering
projects. His pragmatic approach is particularly well suited to detailed analysis
and evaluation of applied traffic engineering problems. An important part of this
work involves bringing together private developers and public agencies to find
realistic solutions to controversial issues.
Experience
•
Through participation in numerous studies in Washington, California and along the
east coast, Mr. Markley has gained recognized expertise in the fields of traffic
circulation, parking analyses and design, signalization, nonmotorized and pedestrian
transportation systems, and short-range transportation planning. He is particularly
well qualified to support or respond to environmental impact statements. His
expert testimony is frequently sought when complex traffic operations issues result
in public or legal conflicts. His areas of special expertise are:
• Traffic circulation and operations studies; .
• Traffic impact analyses for large and private developments;
• Short-range transportation planning;
• Parking demand and utilization analyses;
• Detailed signal system studies including developing of plans and
specifications;
• Development of plans for non-motorized and pedestrian circulation
systems.
Background
Mr. Markley is a graduate of the University of. Washington (BSCE, 1969) and
Pennsylvania State University, Bureau of Highway Traffic (MCE, 1972). Before co-
founding The TRANSPO Group in 1975, he worked with JHK & Associates and
Tudor Engineering Company. He also has served as an instructor at Seattle
University, the University of Washington and Cal Poly at San Luis Obispo.
Mr. Markley is a member of:
• American Society of Civil Engineer RECEIVED
• Institute of Transportation Engineers
CITY OF RENTON
HEARING EXAMINER
JUN 151982
AM PM
EXHIBIT NO. S 7,8i9,101)1,12,1,2,314,5,6
ITEM NO. -
INDUSTRIAL BUILDING PERMITS
16 - RECEIVED.
15 - CITY OF RENTON
HEARING EXAMINER
14 — i UN 151982
13 — AM PM
12 - 7:R,9,10t11,1211,2i3.4;5,6
11 - 1
10 —
9 _EXHIBIT NO. 171
Total 8 ITEM NO.
Permit 7 —
Valuation _
(in millions $g
5 --
4 —
3 —
2 —
1 --
I 1 t t
By Year: 1975 1976 19.77 197B 1979 1980
900
•
800 Using factor of $20/sq. ft.
factor of $30/sq. f ' .
Total 700
Square
Footage
(in 1, 000 's) 600
(s«.tt. /11
C 500
�:r ..fit J � \
475
450 / 1 .
425 /
400
375
350
325
300
'
275 /
250
225 j
200
175 /
150 /
125 /
100
75
50
25
+ 1 1 t t i-
By Year: 1975 1976 1977 1978 1979 '19
CITY OF RENTON
OF Rv t'
41 4 z BUILDING & ZONING DEPARTMENT
Z o
RONALD G. NELSON - DIRECTOR
00 �� MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
A094,, SEP�EM$6P
June 30, 1982
BARBARA Y. SHINPOCH
MAYOR
Mr. Del Bonds
Alterra Corporation
P.O. Box. 66101
Seattle, Washington 98166
RE: BLACK RIVER OFFICE PARK/FILE R-129-80
CORRESPONDENCE.FROM ERC OF MAY 28, 1982
Dear Mr. Bonds:
The Environmental Review Committee has re-evaluated the flood storage issue on the
proposed Black River Office Park. Specifically, it is their position that Condition No.
2 imposed by the Environmental Review Committee on May 28, 1982, should be
modified to read as follows:
1. Any development of the subject property shall maintain the current 100 year
flood storage volume at the time of actual development.
This condition has been modified as a result of uncertainties surrounding the
determination of the final 100 year flood level by FEMA.
Very truly yours,
Environmental Review Committee
,•f2////2/: )
l nald G. Nelson avid R. Clemens
Building & Zoning Director Policy Development Director
.(.? /.;
RI and C. Houghton
Public Works Director
OF
R4,4/
�� ° BUILDING & ZONING DEPARTMENT
RONALD G. NELSON - DIRECTOR
Z ealL
0 MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
co-
0,9gT�D SEP1_‘•0
BARBARA Y. SHINPOCH
MAYOR
July 16, 1982 CERTIFIED MAIL
#115428
RETURN RECEIPT REQUESTED
Mr. Del Bonds
Alterra Corporation
P.O. Box 66101
Seattle, WA 98166
SUBJECT: BLACK RIVER OFFICE PARK/FILE R-129-80
Dear Mr. Bonds:
The Environmental Review Committee has further reviewed the above referenced
rezone application and based on testimony received by the Hearing Examiner's public
hearing, Conditions One and Two of our certified letter mailed to you on May 28,
1982, have now been modified. With this revision, the Committee imposes the
following conditions necessary to mitigate the adverse impacts of the proposal:
1. Prior to second reading of any ordinance rezoning the subject property, the
property owner shall:
a. Dedicate in perpetuity for storm drainage purposes that area,
approximately 9.14 acres, identified in the SCS P-1 project as the
forebay pending area, and;
b. Preserve in perpetuity by open space easement to the City of Renton for
wildlife and natural vegetation mitigation purposes that area,
approximately 10.5 acres, illustrated in Exhibit 12, R-129-80, as CR and
P.
2. Any development of the subject property shall maintain the current (at the time
of construction) one hundred (100) year flood storage volume.
3. Any future development of the subject property shall be subject to further
specific environmental review with total building floor area and type established
upon the following criteria:
Mr.-Del Bonds. .
July 16, 1982 ,
Page Two
'..+`: a.` Adequacy of .transportation access.'. Any, intersection impacted by the
"proposed development if above LOS-C °Shall ;not 'fall' below LOS-C. If this
happens the .developer shall make such improvement;to' return to LOS-C.
Any intersection below LOS-C prior :to development shall be maintained
at its present. LOS by improvements by the developer... If the intersection
is presently, below 1.0 V/C the developer; shall make any improvements to
insure the existing Vie, ratio:
b. Adequacy ::of fire. response. . The"'applicant shall demonstrate how a x:
satisfactory response time can be established for'fire apparatus.
G. Adequacy of`water and sewer utilities. Water and sewer systems shall be
established at such size capacity and location to meet the requirements
of the buildable area established by 3a.and 3b ;above and the Utilities
Comprehensive Plan:,.
4. The cost of any capital ,improvements required`.to implement paragraph 3 above
shall be the sole initial responsibility of the _developer. . : Any late corner
provisions provided by local„ordinance;shall apply.
Very truly yours, ,
Flonald G. Nelson David R. Clemens
Building & Zoning Director ; .•Policy"Development Director
Richard C. Houghton
Public Works Director :"
cc: Mr. Joel Haggard
UNIVERSITY OF WVASHINGTON
SEATTLE,WASHINGTON 98195 r'?
December 11 , 1980 `: - R 'yf®
�� A�CEI�ED
Institute for Environmental
Studies V
Office of Public Archaeology 15 1
Engineering Annex, FM-12
A`9NN
NG 1JE/
Mr. Del Bonds
P.O. Box 66101
Seattle, Washington 98166
RE: Archaeological Assessment of the Black River Industrial Park,
Renton, Washington, T23N/R4E/Section 13.
Dear Mr. Bonds:
In accordance with your request we have assessed the archaeological
potential of the property on which the Black River Industrial Park
is to be located. This parcel of land lies within the drainage of
the former Black River, which flowed from Lake Washington (prior to
1917 when the water level of the lake was lowered due to construc-
tion of the Montlake Cut and Hiram Chittenden Locks) meandered
southwest and drained into the Duwamish River.
Two archaeological sites have been discovered and excavated in the
area in the last three years. The Sba' badid site includes two loci
of cultural activity and is located just west of the Renton Shopping
Center. The two locations at Sba'badid have been interpreted by
the investigator as two historic Native American villages, probably
occupied by members of the Duwamish group of Indians. The older of
the two locations revealed the remains of at least one long house
approximately 30' x 75' in size. Early deposits here contained few
trade goods while in the later deposits trade goods were common.
On the basis of artifacts and subsistence remains, it is thought
that this location was probably occupied as a winter village in the
first years of the 19th century. The second location at Sba'badid
was occupied sometime later, possibly as late as 1865. Preservation
at both locations in Sba'badid was excellent due to the sealing
action of the silt and sand deposited by the Black River.
As you are aware, the Office of Public Archaeology conducted
archaeological assessment and testing of the proposed site of the
Earlington Industrial Park which will be located at the present
Earlington Golf Course. As the result of a systematic subsurface
coring project , a buried archaeological site was found at the north-
east extremity of the property. The portion of the site located
4 Recycled Paper
4
fa
1
Mr. Del Bonds
December 11 , 1980
Page Two
within the boundaries of the Earlington Industrial Park was excavated
by a crew from the Office of Public Archaeology. The site is presently
interpreted as a seasonally reoccupied fishing camp which was probably
used before the time of the occupation of the two areas at Sba'badid.
Analysis is currently proceeding on the cultural remains taken from
the site. Our knowledge of the settlement patterns and subsistence
practices of groups occupying the Black River has been substantially
augmented by the archaeological studies at the two sites.
It should be noted however, the northern limits of the site on the
Earlington Golf Course have not been surely established. The possibil -
ity exists that the site (45KI59) may extend into the property to be
occupied by the Black River Industrial Park. This possibility, coupled
with the fact that we are now aware of the existence or former exist-
ence of several village sites in the general area and that local
Indians tended to move their villages often, lead us to believe that
the Black River Industrial Park property has a high potential for
cultural resources.
In order to test the property for possible archaeological sites , we
propose a subsurface coring program because past work in the area has
shown that aboriginal living surfaces tend to have been buried by
alluviation. Both the Sba'badid and the Earlington Golf Course sites
lay buried some depth beneath present ground surface, sealed in by
the sands and silts deposited by the Black River. We would suggest
that coring be carried out in 25M intervals in areas judged to have
high archaeological potential and at 50M intervals in other undisturbed
areas. This would exclude coring along the old Columbia and Puget
Sound Railroad grade which bisects the property from east to west ;
the present railroad tracks at the northern boundary of the property
since this area is covered with a large amount of fill ; and the
channel of the old Black River. These three areas would be excluded
from the coring program. Coring of the remaining area, should serve
to detect the existence of presently unknown archaeological resources
as well as delineate the northern boundary of 45K159, the Earlington
Golf Course Site.
Mr. Del Bonds
December 11 , 1980
Page Three
I hope that this assessment and its associated recommendations will
prove adequate to your needs. Please contact me if you have ,
questions or comments.
Sincerely,
VJoan
Staff Archaeologist
Hal Kennedy
Assistant Director
7
cc Robert W. Thorpe ✓
R.W. Thorpe & Associates
Jeanne Welch
Deputy SHPO
N
•
• CITY OF RENTON
RE7ONF APPLICATION .. 7 .
FOR OFFICE USE ONLY
LAND USE HEARING
APPLICATION NO. /).? -cf.0 EXAMINER 'S ACTION
APPLICATION FEE $ APPEAL FILED
RECEIPT NO. CITY COUNCIL ACTION
FILING DATE ORDINANCE NO. AND DATE
HEARING DATE
e* . 4s7 )4/';,S'r s9 aLc/te e. _3-7-7 9
APPLICANT TO COMPLETE ITEMS 1 THROUGH 10 :
* Amendment to Existing Rezone
Application No.
1 . Name Alterra Corporation (Del Bonds ) Phone -246-7861 _ ..
Address 2120-A S.W. 152. nd Seattle, WA 98166
3. Property. petitioned for rezoning is located be north of Earlington Ind© Park
(rnopposed Earlington Indus. Park)
between Earlington Golf Course and Empire Way pe •
4 Square footage or acreage of property 71 .16 (Note-includes 7 acre rezone by
Hanson
5.. Legal description of property (if more space is required, attach a
separate sheet)
SEE ATTACHMENTS
•
•
•
•
6 . Existing Zoning G (General) „_•� Zoning Requested F • ng Park
NOTE TO APPLICA'...' : The following factors are considered in reclassifying
property. Evidence or additional information to substantiatE
your request may be attached to this sheet. (See .App].icatior
Procedure Sheet for specific requirements. ) Submit this forrs
in duplicate.
7. Proposed use of site Rail served warehouse, and office in office park
setting.
•
•
8. List the measures to be taken to reduce impact on the surrounding area.
Please refer to the Draft EIS - Black River Industrial Park Rezone
(Submitted 1 1 /19/80 to the City Planning Staff )
9 . How soon after the rezone is granted do you intend to develop the site?
The next step Yaquld i nc'I ud.e .,i .he Plan /7d a_nproval•s .
All permits would follow development permits 6 to 12 months
10 . Two copies of plot plan and affidavit of ownership are required .
Planning Dept .
See e c Draft EIS +e+ Plot Plan / Affidavits 9,•'•-t•n C`�, 1-77 1.
• 8004240435 •
•
O 5-3 O '- 0 )3 0 ►) 0 ') 1-3 O F'J }3 Ct wt.!, F) t' Fit 0., 13 0 0 Pi '-3 0 C) 1-' C) 1-3 0 ) 111 r3' t'
HI -)' F i) :,' Ft, :)' Fit :s' F1) °)' 1,'. 9-1) 01) ::1'' 0 0 0 :)' F'P) 0 P. Q' HI 0 J CV' O • 0 ti' 0 Pr) C) P CO
0 Y',1-_,)' C0 0 C) 0 P' 0C,° �: nn0 1_'• 0c) ro s✓ N0 0rsoCt0 Fi . o c < TA
---? :3 w 0 F-' 0 w :1 F-' :3 C) tv cF :3 r'r ri rt• ei p., r-i Cr :i tI) ('r P. :1 rt' ri• O r'r i1 ri F-' :i Ci F,• Pi
CO C) IN.) C) •I C) CO C) UI C) ct tV 0 0" Fes• 0 Ci 0 P) :r >1 C) :3' Fi tji C) 0 :3' N C) :3 I-' •
e 0 ,,,N, (1) F N, , -' CO —i 0 a� 0 GI O 0 0 0 0 0 Cn 0 ;.1F C).) 0 '• O' 0 r) o CO Fi Co 0\ Co c'rtr?
• w 0 0 e c NN) 1-, t:, c) 0 HI 0 F% 0 p, 0 i-' N w Fie ')' C,
wU) O' to N % W '4 tr) ;j Ufa r 0 O C) 0 0 to C) 1-'• <' O P) i N1-, 11 i) 0
01 ...1 N) i--f ,r rt r, I-' C; c, et 0 to i 0 0 :1 C Hi F-' ,I'N, Cr) O 0
F1t -.) ,,N 0) N c,3 0 i-' e'r CO CO P) CO F-'• :1' 0 :3 Co Q., :1 Co ri Fi, 0 `2.1 C ri F i C)
O Ns I-h C\ 1-11 w Hi ....s Fit L-' F;, Cr) Co ,Q P. v{ 0 0 7-h rF C) Hs rt. c-Q C) o-1 C Fit < tC1 C) al
C) o 00 Cl) o Cr) o coo Fit 0 f' P' f), 0 :3 F'• rt. Cr C) N. 0 Fa Co ;-i•0. 1-,- 0 I'• �1' ), I.'•
ci t') CV N) 0 I--' C) N 0 0 'Xi Co t9 F-' P) . I-' to CO 0 I-7• II 0 :$ HI 0 re H. F•' 0 0 1-'• I~'.
-..J c'r N ct• •.1 r i I-' c-I• •.9 0 0 O En Fi i?, to C 1-' O U) 0 O 0 ct• f1 ® C) Pi Fi r 1-tc2 P' Ci ct
rt• - ,a °. -' °. 01 a. ri. Cl re 1-'• 0 CO 0 0 P• :J C) F'• r1' O N. 0 t) F,.
.0 Y) t.) N c l- to r e N 'r C cr r s C) to C, N) ., cF tr) :i ;.•.-'' to :i ga Hs 0 C) P' 0C) C) C) °
N.) N Ul . 0 N 0 cr+ 0 Cr :.t 0 11 Cr ri• Cil V 1\)'Q N® 0 cO, CO :3 ty' a I Pi 0 f'' Cl) 0 ".1
re :; r. 74 a3 0 Cl) a C) ar « 4, N 0 ta) 0 , F., a, HI .
CL' P') Cl 0 ;1 0 Hs 0) P) r1• P) tr3 F-' P) C' < W Pi I, ct C)
CO *:=� 0,1
-... �'.1 t J o-°'.i `.4 en CU 0 F, HI C) CJ :'-°a t!5 0 F-' O' F-' f. O 1 i t•i Co P. Fi 1-' 0
:.-s'' ::1 r1 Co 61 c-i- 0 0 c-. O Fi I—' 0 to ID. 'Ci 'C; 0 °' :1
r`r P' P) 0 P') A) Ps U U P') to 0- f•) c-I• �; 1.,° 0 i F--, e• �' U C) 1-- 0) ct. -
H i--' C1 F-' 1'1 F-' �s I...., i i i:' t ? F--' P) 0 1-' F� tC? N t h lr), P. "' Q, U 6 r P. t i t.s
t O 0 0 cC 0 tC? 0 Co ;-i 1 0 P. FH),.Q Q C rt ;1 F-' 1'• :i P) P' tt' P?,
C> `3 ,`3 '3 F' :J F-' :1 tt? P) :� i1 P) 0 to P) PO C, eC) tfO to ,!, Cr O ri• I'-f :3 e
tC? �? tr? CO t� n cC1 t. 1-' ri tc) i'' tc? F> C' ri ;1 Co r;• :: (I' tC.;s' 1-h t..f Ln
,'Ci N CO Cr to F•' 11 cY et F'• 0 Pi, I-" 0 0) o C) 0 C) 1-..' 0)
C) 0 CO CO 1-0 t) '"(1 0 p; Ci) r+ 0 o re ci Co r)' P.f, 0 P), `i r1• >3 ,IN yi -J F-f C)
F'. fo 1)' P) 0 f'' 0 N WO' Fi ,:.)' 0 to 0 0' Fi CJ 'Ci 0 C) 00 1-' P) HI
,� 'i P. I-'• F'• 1-1. 1-1- 1-,. I-'• En0 0 re Fi Co - Cc) 0 P' 0 4 Cl) .' 0 ti rt• I--' . C) 0
..1 if---ci• PL Q, ri, '>5 Q, ',.s o, , i-'• O F.'. 0 `71 O Fit 1-1 0 0 P' F-' t-it Q o :7' P. t iJ C.)
ri re ;1 Hi o-t 0 Fh 0 1:3 HI 0 C co Fi0 CO CI CO :-i c'r
'0 CO C4 to ®c 0) a•,, 0) F-•' ci 0 i``-1 0 Hs 0 Fi ct' CO I-' c- cF I'd t-i) ::w C) C)
H) 0 O 0 0 0 kr) tR Fi C) Fi • t i cI :3' 1J�-, '�7' a".)' O CA a L'
Ci C1 0 1-, 0 UI 0 P) ri• F-' c- Cr r'r V p' CO Cl) Co P. to t i 0 0 e P' .
11' c' r' r 1 r i c'r 03 c-j I-'• 1,7' t,) V i i' 0 I-' 0 1-' 1-' Fi S ,C I-' 0.; to ,PN i3
0 J' it a.) :-,' i.3° '•e f1-, •c ri CO I-' P. U'I 1''• rJ ri l0 :r 0 cl' F-'
to r;- F-° 0 1-J to F'• a CO ti 0 rU) a Is' , °' C.)
F'• b.' t j' tr ti' rp' to P. CO 1-'° 0 LI 0 Y• '0 :4 0 C' < L.O. o • ,'• Fi
:i 0 - 0 0 0 0 • CO 0 '$ c; 0 ,t1 r, 0 t h ri--. C' t is N I-'- 1-' o CO 0
ti F:' {{ r' ci r', 0 co :5 Cl C) r'r Cis CO i3' F'• ;3 Co P. F--'
F'• ,1 ,J �3 I- Ii 0 cr C) ri r' 0 CO U) I-' C'r 111,..C1 CJ :3 F-' ro c C`,
'' tL P), O F-" O 0 •z F-h a1 ci• r` Fi P) Co F'• Co " I-•
t fO'-1 P C)� CU • iU 0 O Fit 0 Hi Co F-' •r � O i 0 0 pi ,N C')
a F i Fi Fi hi F•i ct• >> P) Cu CO c; 0 rP Cl) W P) LQ rr I*0 a c
04 '.<, ^C '� Cr r°r 0 0 ri• c°r :3' N) 0 - o 02 C) 1 i V) HI r. C
• F-' 3' rF cI :s' 0 LO Co tv J rl' P) 0
$) C C' C p' ti` G) 0 Co ill °' rF Y. L0 ;1 r';• :-)' p, c`r t, 0
C) 1--,,5.2 0 CQ O ? F'. - 1,- Fi F-'. c;• /.•> (:)
, p, 2, a, • C, r� f:) '1 F-'• ClC� NOW Co toC) 00t:. 0P)
P. P. P. P. P. Ii 0 P1 C) 0 Fi Cl = ci• G) ;i :3 0 Ci, C)
C^ Lit Cn 0 1.7? 7, c, 11 C,) H 0 ci rr '"-, F-'• ct C. 1-•' t' Q, t-h
ri r''e ci ci rC f=' I-'• V. et- ci (7, '...)'' tTi 0 0 Gn V 0 i-J• F-'•
r., ' C) P.' P' P) t-i to V C) Co :) Fi Co tC? t.,i 0 P) Ho ;; 11 C9 to
i I >') :3 >1 ai '- CrFiJ Fi C, P•) Ci' 11 F.,• P') t') Pi ci C7
0 C) C) 0 C) P) Cs C,l 0 t31 P) P: n F-'• P' <^
C) C) 0 CO C') C) ti 0T, c•i 0 U I Fh Q 1-' H >' '') s
I'i) 0 C) ;>' F1, p .F-'• b P) rF to {) CO
o ` ti P' r r o •-7 "t3 CO O P')
• pa to
• C,,
. N
RECORDER'S NOTES: �� - ;- e•
r0 OiNS 0--TH.1$ 00CLWENT .POO QUALITY cOt' FR--1ti rr3°-.
. U) k.
0 4J Cd U U r-I tN1 rb 4; 0 Sa
0 - N •13 fd 03 14 c .-i 0 0 -ri
•ri • C') 44 rd f". 14 14 0 a`a r-i riS 0,1 al ri c. .-i
• 4.1 ^,3 e-1 0 0 C} I i fi•i 451-4 r--1 0 ,r V�
0 y 0) in tr- u (d 63
-
• U) ' 0 bl r 1•a U 0 .0 (d +`i •o kJ C) r-i ;143 .---10 0) C) 11 c-.` 0 -I 0 rd 'd r-i 1 i 0 r-I r:; N 0 -r-i .-C-a 'Gl 0
id 01 5•4 0 r; J r-i •ri •ri (1.3 0 I-1 P 0 rJ O ('14 t 4-3 r-i rd V� •,4 4-1
N 1=4 •r-1 •r-1 0 ni f4 Cd ,iI 0 rd 14 14 4-4 0 0 ra r-1 cd ;0 R'3 5--1
43 4•4 -:J r-i 0 P1 0 0) ;.3 RI 5-1 i t r-i (J (4 in -,1 rd S i U fj
• ri '' O r t) 1-i ;.i (.i Cd .-i .--1 Pi H 0 0 }-4 1-1 0i 14
• O • •ri 0 0 0 U) 43 Lk 44 :J P4 14 0 ® t) Pd (i (4 .CI (J
r(j O) 0 14 zn 13 ,C., 0 0 0 00 0 r-4 r0 .'? 0) 0 P'a -P , A
fJ U' C) r-i 11 :1 rd •r-1 r'j ,cl c1 0 Cd rd Z.1) C)
O C) f' d1 r-i rd 0 0 `;:-.1 v s rd I 4-3 0 (J cS 0 ,J '0 0 ;, C: rd
14 ,ice 0 1.i Cd. •,-1 0 0 0 s A 14 14 0 0 :3 •-i 14 f i 0) 0 .•r1 •ri C) •ri •ri
-1 , •r1 0 0 •P 0 J) (4 0 0 (j 0 4-4 ['I .P al •r•i -13 al > 0 r-1, ill
•ri i + 01 ,s1 0) 0r0 rd -I-14 i 0) -,--4 O 0 '0 0 fJ 4-4 U)
r3 0 rd > 01 a - -P 43 U) •ri ' (` r-i 0 0 0 "".1 r.Z e Al4-1
14 rd t' X; a t:-1 ;0 0 �-, ;� 5:1 4-3 (4 ✓1 r3 C3 ? G:53 r-I 0 U'
. r-I 0 41 -P 2 U) 0 0 0 U} $1 O 0 4-3 °ri >1 0) tat H 1-i 14 4••-1 r°° Cr-1 r-i r-i fi
0 0 14 (r) v Cil i:-I rid •ri 4. A 0) r•-1 r-i 0 ;.4 0 C) CJ .• O s--I 0
•ri Or) 11 0 0 0 1•1 1 S- b}l al 1-i i-; L4 0 ., •r-4 N r-i N (;i r-
514 l) 7 v '+r-1 0 ,1 '" CS 0) ,(i CI 0 6- -P 0 .i .{1 r�. c4 C'1 rd i,') 0 1.1 (J
43 ,c. rJ r•. - r rJ 1 .•�
r-i ..° ti q r-I � tit , r-•i U) ,L. U3 r-i •.1 ':3 v rJ 0 r-•1 CO C
. 0 (=l 3.1 C') ,.3 0l 0 1-i 1-i 4 0 0 ;0 0 tea' C) Jr.) S1 ;-3 r3 © co �. Pi
rJ (J i") ,J (3 4-4 0 0 '-' 1-1 4.4 0 0 ,.0 0 •r-1 03 0 0 4-4 .%H 43 0 4-1 1i
Pi 0 '.S 0 trl 0 'A GO 0 0 0 01 43 6 0 43 :7i 0 0 4-3 .0 Li 0 .1-0 ,0'`\-
I:-' i); Pi Ci) (C' co .CI 0 rCS 0) 0 43 Cl) 14 i 'tJC 0 •.-1 U' \
OS •-1 [n C3 0) U3 .4-3 0)( 0 0 • • •r-I .1-13 P Cl 1•i 0 0 ..-1ri 0) (4
.>` -P ,C 4. 0 0:) . ,C; 4-1 0 '' .. 41 rJ 43 .�i 43 C) 0 0) i'rd i i 0 0 U) •1
r..1 ;3 0 0) ,0 4) rC) 41 ,•3 0 fi °r-{ 43 :1 . •i-3 L: , 01 0) 0 U) 0 1. 43 0) C.
;:i 1-1 C•.S r: 43 U' 0) 1•i 0 O 0 43 °ri 0 4-4 f; G1 r-1 ci) U) rJ s® U' 0��
i 3 0 c7 ✓ C1 .,-1 f0 uJ C) .P Pi U' 0 U' 0 al �))4--4 0) 's r' 43 -. i
(Ii S? ,c4 0 is-4 (0 •'-I P r„.. C) 1-1 0 %-i 0a 0 r-i t o , 0 Li C C) Y, •-) 0) 0) 0 0 •1.J
. • 0 4- C-1 0 c' �i 01 0 1i 0 0 0 O 4-1 C) O in :1 0 cc) 4.3 0 rd -4 •rl ,'..' r••i
0 1.I 1-S U r-i 0 G4 ,ri r-1 0 r-1 r-I co ,`-2 0 01 0 rd rd - (:i 0
• •-) 1`: c) .. c, ti Cl ,C-1 c3 4-3 14 6.1 k0 rJ 4-1 'ti rJ 4-4 fi 0 4-1 ,C N"`. r-{ 4.3 0 tO ..3
Cl) co in 0 ,0 0) 43 0)44 tia e In c1 0 O (J f: 0 r) t.(J
[:! s-'I ri -P rd ot'1 'Pi 0 r�`a N 111 N S'a j •ri N 14 0 0-g 00 0) 43 34 0 rd 0 CO CI1.3 •r•{ 0 s-i r-I 0 .)• D .0 (4 ,-I
d 0 .s d G1 1-4 O 61 01 = LO rr� . co - N r. .-1 0 -.--1 0 -iJ 4-1 c: • } 0 'c1. •.: t 4
0 !-, .13 O n O 03 rd N 43 N N f i ve° °r1 l� rd •ri ,CI O 0 ;P •rj f' co)) ,.3 .
,.'r.' 0 •ri IN 4; 0 (`) in 44 0 4-1 0 0 03 r-i •r1 r-1 10 0 • () .CI 04-i c•) 0
• 1.3 •r 1 ii 1 41 'co U' .(4 •- in 43 'Ti - 0 .' 0 .-i •.' 1•i % (J 1-4 •r1 0 0% Y 0 - o e
id :3 O 0 33 N 0 41 q r-1 U f; N CI' -) `c;' 0 0) 0 0 0 IA P rd 0 rJ - C') •1.1 (d
$ 1l 0 (J -I-4. [n (d 0 -. c'3 0) in 0 rd N 43 43 231 :-3 •ri > 4-I 41 0) in 0
4 •:i r' Ul .(1 PA rt. :-5 o 0 1.1 o 0 o 0 0 0 0 rd 0 0 C') r0 ,0 }i U' 0 0 H 0 0 U'
• - •ri 1 1 0 P •ri U.1 0 0 0 E-i 4. i\i (.', 0 4' 0 1---1 •U O O' 0 0 ,C rJ CT .S• 0 0 U' GI 4-1 Cti
;cr• 0 •,-1 4i ,CI (J 0 •r-I CO N (0 N Cs A 0 0 0 •4-4 • 0 0 -P 1-4 P U 0 14 i1-1 ci S14 O
0 4J 0 r0 0 :' Z.31 •-) 1:--1 in -, 4.1 U .t: ,-i 0 -i 0 Cd i-- s-1
0 1-i 0 s: 0 0 O C% t!) U) r 0 4--I Z 4-1 0 U rJ r.) O rd 1� rd r3 4-) i0 U1 0 (d
0 f-1 0 1,1 r3 := ce •1-1 0 s-1 •rd r-I H ,c5 ,f. ;J C 5.1 0 ' 4•-1 e
u' 04 0 0 >i 0 (') 02 14 0 10 iU rd 0 0 0) -P 0 (1) 0 4-3 U'41 ;1 0 0) 8 rJ U N c:)
(1 .-i 4 3 0 C-i 43 a U 0 -. U U 0 0 in .C; 0 0 tV 1 0 0 0 U i U l') 0
0 043 14 , c •ri I-1 rd.0 0 • 0 0 (1• 0 0 Y .C.' 4i C) f-'i,s1 > •ri 4.3 P. 11 0 ii f' .-i 0
. vi •l"1' rJ id •• ;:3 0) :)) •ri 1i PI 0 (1 0 0 0 P 0 • 0 -P 1-4 > 0) rr' 0 O r-i 1.1
(1 0 S. ; 9 q 0 0 4 Cd 0 f3 ,(: '0 c l0 $ S+ in •ri 14-4 1-4 (: •r-1 .'3 rd. 0 0 0 4 + 0 0 4 i c,
0 :-1 C-i c:)':: ,-i C) • ill E-i 0) U ;; E-1 c\i C-1 N c E4 01 O 4- • C-i 0,.O if4 0 C-4 4J ,-i 0 i-1 0 C-1
SEVOVZVOOE -
HANSEN JOHN R INC .•
6 8-11 LJN-T-S---P-0 I-N T--R D
BELLEVUE WA .00 •
• . .
• .
. , . . . . . •
T-L R_OF___S E & Sw u TR....13-23-04-D A F- - G-- -AT--S•-1./4-
', OR OF SU SEC. 1-3---TH -N 00-58 -28 E ALG N/ S OF SD SEC 1.3 A DIST- OF 84.84 FT TO SE COS' OF TR 2o.
EN ION sH OREL AN DS 2ND SUP L C. TPOB TN S. 72-37-52 W ALG S BNDRY OF SD "IR 26 A oIST OF 382. 60 FT
rh N 70-5 4-02. W ALG S bi\URY OF SD 1R Zo A DIST OF 7:3.51' FT 10 E LN OF CHAS BRO•riNELL DC
zLfj 1t1NAG S 1)-E--LN-,-9.50-.53-:.RT-TO-A--LN-:3 5- FT-S F- - PLW °F.-MOST SLY--T R
iF C M ST P G P SR TRS TH ALL; • • SD LN 35 FT SLY OF & P LW CA OF .: SD MOST SLY TR ALG CRV TO .RGf•
OF WCH bRS S 15-22-32 E A RAC.) OF 2790. 19 • FT - ARC DI ST OF. 6 59 ,.2Lt FT T t-h:t U A C/A OF
3-32-14 TAP OF COMPOUND •••••.: •CURVATURE TH ALG A CRV TO RG T -• ALG SD PLL LN C TR OF WCH ORS ••
5-01-50-1U-E A.. RA LI-OF- 1 10 2. F-T--:-AN-A R1:-..D IS1... OF--8 07 .1 1-.F1 -1 FIR U C/A 0 F 4+1-5 6-46--T H -S 49-53-32 E•-
kLr SpLL LN 167 .07 FT 'TM ALG . CRV TO R GT ALG SD. PLL LN A RAD OF 18 29.78 FT - AN ARC OI S T OF
09 .67 Fl THR U A C/ A OF 09-4 1-4.8 TH LEAVING SO PLL LN . S 40-11-4-4+ E 126. 24+ FT TAP ON S
N UF ON RR R/W TH AU; A CRV TO L FT - ALG SD S LN CIR WCiORS N 49-4E3-1 6 E A RAD OF
A RC-0 1.S 11_0FL-5 U__A--C/A--OF-3 1--17 -1-9 -TAP-OF.—- AN GE ro-.-ON-SD- S.• LN •UF 8N -
11-1 CONIC; ALG SD S LN • • -S 71-29-03 E . ALG A LN 50 FT S• -• "•• OF C PLW EXISTING SCUTHBOUND::",••••.
I RA CK 82o0bo FT To W LN OF • SIR 18-23-05 TN S 01 -0 1-27 W ••• 25. 99 FT ALG SO tri LN Th
ts Z3-1.5-0 W AL'; N LN OF O5 FT OF SE 1 /4 OF SD SE.C. 1:3 A • •: :.. DIST OF 2261. 41 FT TO AN ANGLE ' •
S NDR Y.. U 5._SD_ ENTON-:-SH LDS_T.H N-33-07-25- W-1 .5 T•-• TO-AN- ANGL E PT TH •
27-21 -32 E 387. 32 FT 10 AN ANGL E PT TM N 83-17-25 W 171 .17 FT TH S 46-22-22 W 324.66 FT
IN S 72-3-7-52 W 76. 33 FT TO TPOB LESS C/M RGTS • . • •
. .• 1 ••
RECORCER'S NOTES: •
PO (IONS 01:11-1S DOCUMENT _POOR OlJ�UTY. FO .--t-i'l. 1 •
3
• .'
f.
to 43 0
•ri • Cr) t:-1 rd f: ,l{ i-1 Cd U ri (J N Gl ri f1 a—i -
:3 ..'' r-I 0 U C) Et C.i : 4-4 H U U c in (f{ co 0 0 .`.
C) :3 U 0 ,5 C- 0 0 .0 0rd H0 v LO 0 r-i ;i 4 3 r-1 - ;� .`^
0 ) C) f i 0 C) :3 Cd rd rd r-i }.t Cd r-i 0 N C) °r-i ,C 0) (
rJ CC •i-1 O I r3 ri •,-I •ri C.) 0 r--1 •:3 0 d 0 C") 4-1 43 r-1 r(i i:J) •ri r--i '+
7-1 W w •.-I •r-I O ni rd rd .(: O CJ }a 14 H O 00 r-i rd 0 rCi r-I
.d t1-1 -I3 r-I c1 pi U) tr) •13 0 }- yir-1 rd 0 In •(-i rd I•i 0 0
3 ti' 0 I 0 }-i ,`.J C•J 0 r i •:I PA r-i 0 O }•-{ 1.4 0 t{
O • •ri 0 0 0 U) 43 (Ii 44 4-3 Q• }i rd m 0 P-1 Cd 0 ,: (0
rd to 0 14 c •1) .Ca-' 0 0 0 co 0 Y-0 r-0 0 :-S .3 'a Pi
Id ijl 0 r-i f: !3 rd •ri rd ,C.', I-1 U rd rd U-1 0
i' 0 0 r-: 41 H rd (U f; >i :>3 gd 0 ,U 0 0 0U 4-3 '0 C; 4-3 0 id
i-t ,(-1 GS :,i cJ •1-i U 0 0 o.. 14 }.i r) Cd ;i ..-i 3-4 I I 0 0 •ri •rl C) •ri •r-I
.-i -3 fal cd rd 43 0 YC 0 rd S~ cd O 4-i 44 0 0 •ri :.3 0 > 0 H 0
•.-i it 3 c,1 ,ci C) G' rd rC1 •ri 4:4 t,) •ri 0 0 rd U) Cd el-1 U)
0 o rd �N Cj;`T21 . •:r3{ ^3' c n •ri �f.l• fry°( (-I r0 0 U-} p� �y}i Ce,, )-� 4 r•-�i �^(�
r 9 rd I-1 ,'9 a D tH i V .� J 0 3.1j 4) ri V-A 0 -.1 0 S-1 a V'
:-I 01 d.) 4 3 00 O 0 C.) U) S-i O OI� 4-) •ri >1 cO 9i H i-{ -1 i H S A ri r--1 f i
0O }-) 1.1 Ym v • Cl) t:-I"Cl •r-I „f I, r0, U) ri r-I O I. (I 0 CJ ,.. 0 o r-1 0 •
•r i 03 !I 0 C) 0 I•I I ti 131 CJ is I; tzi C) ,,, •r•{ N r-1 :: N Cd ,--
t1-I 0 ^ri 0 ,c+ N-44 Cd r) 4 •(- 0 o`O .I9 0 :, -P .0 y re) rJ CO 0 1•i rJ
•ri CI ,3 .C: !-) (-t 0 43 CO H A 4.) •r3 H Ti) .0 0r-S • P •i a: rJ 0 r-i CO Ci
0 f=1 }.i co .i3 co 0 14 }-a 0 0 0 0 O .i'r cd .0 S i :i' 3 0 c') pa a
0rd0,1 0 04-i 0 0 ti' }-1 4-i 0 0 ,0 0 0 •r-i rd 0 0 4-i ,-(-1 :, 0 ti-I 44
n i O !S O N U *�, C3 0 0 CO CO 430 0 43 Pa 0 0 ,t9 .r, tr) 0 rCt .0
•
. C-, Ui Pi (,) 0 CO XI 0 rd 03 0 • 43 0 44 t510 •r 1 2:7))
-r-i tc) C3 :4 C) Ul .9 C) 0 0 • . •ri •ri ' •9 CI }-I 0 0 •1-1 ri C) 0 •r
:3 ,c.J U C) ,C; 4.1 •fb ,•.0 o' 4 -i rd •I3 ri 43 C) 0 0 4-i }i CO C) U) • I
i-.1 -) C) C3 ,r`+ i rd -) •,,3 0 .r1 •ri 43 ..3 ;-) Fr a G). 0 0 Ul 0 ci -11 O 0
;:S I.1 rJ 0 43 U C) i-i 0 O 0 43 :--I 0 II-I II: G1 r-I 0 Ul rJ 9% r)
1.1 C) 0 i1 .0 (d ts) 0 P Qi t33 C) 0 (J is 4i 0 C) U (-i t]- .0 43 -• 0 ,,-.
n4 !'..). ,I 7 tH C3 •ri 0 0 0 0 14 4-i 0 0 r-i 0 ,c 0 to Pfi 0 a 0 aO Ul 0 v 0 3
:.) e d 0 (; { ;30 C) C)s 0 O O 44 U O in 43 U re) 4-4O c1 1.4 i tee 4-4
°
•
a t i 0 0 r-1 rii FCC ;i r-1 0 r-I r-i Co ,Id: 0 41 0 rd rd ro Cd 0 •
;) r C) 4 0 ft CO ,cl cJ 4..) I-i 0li) 01-4 21 CJ 4-i 00 tr{ .4 N r-1 49 () t.0 .
Ci) t1 r•3 0 ,51 0 41 t;) 4.1 0 0 in 0 0 0 rd 0 0 41 .rd ,(.1 C) In .
44 r-i ••-I 43 113 0 f2:1 •ri 0 'y N ;, 0 CJ A s3 •r-1 N i-i 0 }-I o C
'. 0 r) 0I- O rd 0 CO CO 1-1 •rt () H a--1 0 % •U 'J ,I CJ H-i •
(') .--1 r1 }-i 0 r U) 0 .4 . r ^c•') i� : r-1 ci •ri f-4 43 4-{ 0 . } C) ' 4
f; :U ) 0 0 ;4 0 CO 0N 43 N N f a tee' •ri `r.'b •(-I ,Ci 0 4) ,3 •
O •ri p1 :3 C) C`1 In ti-i 0 t4-i O 0 rU r-i •ri r-i tS U f) .r: cJ t,-i c•' C)
• 0 •r i ti-i •:-3 c7 1J3 .+° .. C' P3 rd .. 0 c. 0 •r4 i•i 'o CJ i-i •ri 0 0® '3 0 a. a w
rd .:3 0 0 :3 N (4 43 CO a-i 0 c; Ems• Cr" 49 'SI' 0 C) 0 CO U S-1 0 cd Q) Cd - nl !3 cd
fl 0 Cd •ri tr) rd rd M 0 in 0 rJ N ,I.) 43 133 •1-3 •r-i > t,-i •1-3 r) un a)
r-i •,-1 i i Ul ,C-1 f>(rc° -3 0 ci I-1 0 0 O 0 0 O f i cd 0 0 0 rd 4 }4 tS3 0 0 ,-i O 0 0
. • •ri !1 0 •13 •ri G1 Cl v O % N r,', 0 0 r--I 4-3 �O C) 0 0 4 frJ Lin I: 0 6i Gl INcJ
e U •,-1 11-4 ,c1 Cd 0 •ri CO I� Cd l` ii f� Q 0 C) •ri O 0 2 3-4 0 U 0 }-{ ti-t 0 . 1 0
VI :3 0 r,../ 0) Y •13 4•4 u1 43 4) () .-0 r-i 0 r-i C.) rJ N r-i
U `-I f; cj 0 U 0 Gl U) d) ;~ U) r-i r4 4-i 0 U rJ U O (:r }4 r(3 rJ ,-J try V1 0 Cd
0 f 1 0 }4 C•1 ;3: tt. •,-i C) r i •ri ri H ,S; ,. .S+ ;9 rC; II 11 c...ti 4..4 o
ul S'-i 0 0 r i f1 0 Ul I-{ 0 rci C) r(j C) 0 03 43 C) 01 0 4-) bl 1.-3 :3 0 r) o ci U N (I)
ci ri d) -3 [i '3 !; U 0 .. (3 U 0 0 u1 .0 ,v 0 0 0 0 O 0 C•'1 -I 0 Q.) 0
U ri -;.) (1 : iJ •ri f: rd 0 61 d (kJ fi fit f: o .Ci •}) U 51 .Ci '✓' •,i 49 .0-1 0 U 43 T' ri f;
•-1 'ci rd id % 0 U C) •-1 }-I Aa 0 0 0 C) C7 ;9 rd 0 •13 }-i > 0 0 C) r-I 11 0 (7
C; 0 (: i O CO 0 C) ; Cd 0 0 ,C: U) ,4° l0 $4 .1 in •ri 4-i }.i ,Cl •r-i 0 rd 0 O 0 ,0 C) ,c,' 4-i c
' c,) :-1 C•s '0",..-:: .--4C.) 01 C-i U) U :°. E-r N Ci N E-i 0 ', O .1 . &J ✓ 0•.�' 41i 0 `-I 4- .-i 0 C-i 0 [-
•
//
':i-.Wrf!rig&11.%T. 7 :£ '.k 'r,X:4A:1 .iri.i". 1;;'"a.:•;i.‹:s`,•Q:t '32rF1-•s.-1r-".,�:ra:z, - -
,#, a �..' •j.r:,�.. -k..y.'�v..-:f ..an.. t;�•,»V..x .� + ,Y:�ryif'e_'tr' "'a..y �'i--�ua�•4'4:-^il;"p �- '
•
•�.,.^,...-tSa.t•._. � y:�•' =��. � �� :,.:s ..y= ;ram..:._: •.`�(.'•„^:::'ta ?"'�:.?�-,.4^�:,.;•
....•»e.... .-„t "tir...,�- :r'- ,�-ass.-.,,�,._.. >.,-..•...
..Ss'r.,� � .?�� as.- :.^�'F'. "�, 4....3• .<.t _ n,.+':"»•:��' 'L'.�d::'..... - - - -
-x.,uF.` R',. - T . �.'f ;`; '- 'r Mfrs +t:t . -
,a'c'aYa+� .�`.�M,..,..:.� E ..'�:�F:C '�c`i�r':5::•y$j ..t.� a.: rt;) � f'h^��� d-yi .eS•�•�eF:�' `.3T»,.-.�' .s<*'^��*t.-.5--°:.t. - .`�',:;:"�tr' w.Y•=.,� _,.S�+. o. � i4>" J��ui~�, .ers.e"•a'GaEy4"'S'1r',.;T,~s � �.,i �.r.
�:ei _,A,.,'Wi :s., -. ,•...3S""' .a14,7.t ;.a '.r .lta' " ".roe +'r.;. "'" .;�• .?1, .�., v'.-.ya+ ': t..''' i..' W nrK-;= _��aq,.--.�•*� 'r�r A.x bri L'` r Ras° .``,.,;�'` 'k '�t:,..a,. tin.;^.ri> ..��:
`r.''N=',qF"-^:':is4 .�.`-. :.ie.`'as'{g'�;--�'� ,q^!.5^,:....�:.✓:.a , ... •• ... _..•_ .. �_...,__..��___•_._--
•
. '
N
•
•
)�
V' 511 r1
O t') 3 4 ij7 ()
04 r- U 43 ,C4 >1 <° f: 0 CI)
t0 U i i 11 0 (-3 .,-1 U tN ,t/ O U (!4 -
v� 0 •r4 rd ld ul O t9 (.0 CO C} 0 U U U
O =J r-{ 0 (3 ..-i (:! 13 rd lA !i (:4 43 ✓s <�` S; 0f4 1.••
c.a 0 ! r' t'-1 (c: O cra b) VI L4 rc1 U O ,O ul !-1 r1 cd 0 rJ cd r.
"-1 ; •ri 0 ,c1 0 (1) W ,4 0 4) -1-) :) •ri 11 4.i 43 .:3 .:1 ;� ,
. 1 id:( 4a 'r til 4J i y•r 4-1 4-3 •.S f-I 0 !..1 rd rd 0 0) U) (1 0 1<�:-:-
0 0 53 1. i
r1 re') 4J 0 !4 O CJ ': 0 •rt 'r-! •ri •r-! •-i
rd C.) ,4 ;,i O O �b 0 ul 0) cc) O d Gl 3 •ri f 1a 0 :1rCj' r0 rd rd rd
C.) ,a c 4) •ri }.; •r-I - •r-1 r; O 0 d is'r-t 0 •
U c:a 0 i r0 ,0 ;) fY 0) A .11 Oi 0) Urn ,!-1. 03 . 0 0 rd 0
0 O 0 •1-) s: N U Ol U ,S; 43 43 ,C-1 ri
c1 t:•{ U) }( rp rG 0 • O N ,t1 41 0 ul ;-) ra y a 'Jq ✓, y s �Y
;) tij1 0 .:1 '0) CJ r-i 0 41 0 41 0 0 `d c; 43 !-i l4 -i :-4 o
CI 'S•i° rd 0 0) 40 N ,C1 r-I 0) 114 ✓ 0 t:1 O :i rd • (d rJ n3 cd b .
-1 0 •r-1 0 rJ }4 :) i` (i-4 0 ,4 O •ri O rd rd rd 2) r0 fl .
I' >. ,--i f•1 (d 01 t:1 43 r-I Cl) (1) 0 ... 4J 0 4J 0 11 S1 fy C: (: •r-1
1-1 •r1 U) 51 -r-1 X-'. 0 Cl) •. 0 0 .C..1 00 ';33 'j .1 1-1
0 CO • 0 ri •r-1 N t1 t (d .43 11 i C) 11 :.1 O P 511 0 0 O 0 0 0 • 0 11
14 La' . U 01 ,7 Q O ceaa 0 'ri U 11 O •r•! 0 •ri ul ,L1 :CI (1 XI A O •r{
1 ' :S' r0 o r; ✓ 0 0 •-{ 0 r-i O r•i P tp
r- i
,14 0') 41 0 •rt in •,-I r•i OJ 4J 91 'd °•• /1 ,c1 ,(: ,.(. C)
rJ y' cf) ''1 r-I \a' $.1 }4 rI e-t 0 s--1 Cl .�1 ,0 M ,C.', •ri 11 CO 4J 43 4) 4) 4J 41
0d0 O 0rfl4 •r1 0 o0 ,4 ,4 4J41 4J ri •:) rd Oin 0 `j 's 0 •1 •
uA 0 O .s1 ,4 r-{,N ,c1 43 4-1 ' ;t4 0 1-10 al 0 O 0 0 (14
NO r) : (1-1 Spa 4J 4) r-! OD P !d O 114 U 11 O 4J r-1 0 D. (2 s+ 0 0 0 O,-.
•
:) c; CI) 43 t.0 O }! 'J 01 O ( { 14 O (1-1 O :; (14 S, :.) 4;
O
0 ';i •r-1 , 1 a. LH ri 0 O O }4 (:i O r% O •ri O •r-I . rd J C1 rd C� r rd '0 !3.....
0 ri •( i t C-t •• 0 lies 0 (iS O 0 - 0 11 ts•• 43 0 O U) •.-1 •ri •r I •r-{ •ri .i-i •ri c:
•:-1 rd r-i co U O as O }4 ,c1 U Ids U ,c: LI 04,0 0 O rr3 0 cd Id OS i J
0 r-1 f+ i `a' f1 4) r--i, rCj 0 1.0 ,r. 0 4.3 43 a 0) 4) 0 c; r� Ps IA P4 G7 (1 C1 c}
CO• s-i U O 0 0 cd O •ri ri) U •,- 43 4) }•I 1.-1 Cl) !3 0 (J1 Alt ,
. ` u� s l (:•! ,i: G� ) ,) bS f: f1 011 i�h rd CO i� !-I r I . 01 0 '0) 0} 0) t)1 i7) c S_,....:)._
o 11 r-•i 0 O P 'V' 0 GI 1.3) cr) 0 0 Ul O 0 1 i ::3 r0 fl rd 'Cis S i r-i 0 H /1 - 11 1:1 0r(j • til 0 0 0 •r•1 ,-i r3 -1-341 ..1 O 0111.1 •ri O r'J 14 0 O Ol O VS O O O 0 •
(NI !-1 •,-4 43 O is r0 •- •r-1 01414 0 2:1 0' r-i O 0r-1 1:)C (iS 11 r•i 1.1 a--1 H . s-i r1 r•i 1-1
43 Co r-1 (..s O ,(< •:1 1.-- r-I 1.1 O •r1 iy 4J r•3 4) Ll ld O 0 0 rd aJ cd rd (ti 0
:• 0 0 Pi al t:.1) 0 U r-I }•i O r0 O U 4J N 0 4 rr:.;O r-I 1-1 •ri 0} }4 }•i 0 0 4-1 ,4 ri IU (rl 0 0 4-1 4) 0 cc) r 14 F=$ c.: a cl.- tie 0
• U 4) 'KS 0 C, > r3 cJ r-1 IQ cd •!3 rd 1. rd 4.t U 4 0 0 rd 0I:.! rJ •r-1 ' 0 cn 0 CL : 4 rd •- 0 O r1 = - p o -
c a O i) (J U r0 .s C1 11 0} ti O mri 01 N .c< to .:1 4) ;.{ O ,ram 4� O in O t� O (n N cal
(j U c1 •;J (d U cJ (:1 ,s1 f 9 U1 : f: in 4J d. ti 1 (1 U O 43 4J t\l •:) re) •:) N (NI to O'
• •.i C9 0 ,( 0 41 •ri or: •ri c .3 0) O •r i =J .- 004 ,. ., .. e. qv. •:J
43 :j 0 0143 }4 0 U . ',1 -11 rd O :� 1n O r-i O N r0 !-{ in O 0 0 ~ P r-1 •P `• 4-) N P C-
at •,-I + O) H •r-1 •:J 0 4-4 c: 0 }-I •r1 f-1 0) Ul s-i cd r--! U) 0 cY, O 0 C'1 C) ri O N (2) rn .:1
',i 'd ,: •r I 0 •ri 01,t; 0 r-I 0 .,-1 Cl 4J 4J •ri C: O rd (J :3 o tl-! 0 0 o U o 0 o. 0 0 0
}1 cJ U-) > t14 0 0 v 0 01 :3 1-1-1 0 41 4.4 0 O n •ri U c.0 0 t:•i of r!-( r- t'-i M 44 k0 4-1 N U .
0 - }4 '0 rd M 0 1Ia 0 0) 0 r0 0 c' 0 ,(.: •ri :0 r3 0) C) .•'', ..--i0c- Cal co �" r- 11-d
to O 0 4}' r-i 1!-1 ld S: O O c'. (i) O -1-) :) 0 r-i 43 --1 r-1 N l0
Q c 1 !-4 r-1 N 51 al O N •rt U in 0 U 0. U f W + In 1,--.4 to ,, re) / r1 ul V ul cn
Id ,c1 + }4 CO r! ri Ord U (;.{ 0 1!4 C1 CJ (;1 ,-1 N + a a e M •
- v1 0 0} lO OJ CJ }i + 0 0) 0 ,Q .r4 0.) r1 O (� •t') O O O rJ O tQ o %i' ot— 0} r i 0) �' 0 .3
• r-; r': 0 01 ,C.1 U 0 to !-1 ,(1. U f: .(: C3 U CJ U •rl ,c4 U N 4) 0 111 U W O r• U N U 10
13 •-{ 4.) 511 s-t 4J C1 4) O 4) 4i !; •ri 4J Ul f. 4J •1.3 rC3 f': •;J 4) 4J f: 4J N r) f-1 r-1 C' cn 11 r-i C: Cn 51
. 0 0 J C: k-1 O C: C) 0 O O LH c; •ri U 0 11 U 0 O k 1 ) I:.{ .1 c: 1{4 t-I (1 1;4 .r1 1:.i i1 1:4
1.1 ,c; 1:4 t O ;t. 6-1 Uri U of [-1 r Ul O . [-I 10 414 U Ci t:4 0 [t t:{ 0 r t t O CI O :i O c.I O ca O
1
, . HANSEN 'JOHN R INC " .•
68-h UNLIS-P-0 I-N T—R-0-.---
BELLEVUE WA ci F004 .
: . • • •
• • • • , •
_-T_-R - — ..1/4 ...e„ SW- 1/4.• F- S TR....13-23-04,DA F. E S -1/4-
:J3R OF SU SEC. 13 TH "N 0-5t3 —213 E ALG N/ S C/L OF SD SEC 13 A DIST . OF R84.84 FT TO SE COR OF TR 2o
EN ION SHOK EL AN DS 2NC) SLIP L C IP OB TH S 72-37-52 W ALG S BNDRY ". • OF SD TR 26 A DIST OF 382 . 6 0 FT
Hi 11 70-5 z-r-02. w ALG S LiNU RY OF SD 1R 24, A DIST OF 73.5 1. FT . TO E LN OF CHAS BI-:M./NELL DC
LL _0 __E..ALG S 58 LN-3 5- S F-- PLW 0 F-•MOST SLY--T R
.2 1: C M sT P P RR IRS Ti-i ALG •. • ", SD LN 35 FT SL Y OF & P LW C iL Of: • S D MO ST S LY TR AL G CR V TO R GT• 410.,,
,. .1k OF WCH BRS S 15-22-32 E A RAD OF 2790. 19 - FT - ARC DI ST OF 659 .2.1- FT Ti-IRU A C/A OF
1. 3-32-1 Li, TAP OF COMPOUND CURVATURE TH AL(; A CRV TO RGT ' • ALG SD PLL LN C TR OF WC H BRS
s.. 01-50-1U_E . A.. RAU OF I 10 2.46.. AN.-A RC-D 1ST- OF--8 07 .1 1-F1 -1HRU • ---C/A 0 F A+1-5 H .-S 49-53-32 E•-
% SD PLL LN 1 67 .07 FT Th ALG CR V TO RGT ALG SD PLL LM A RAD OF 18 29.78 FT - AN MC DI S T OF
09.67 FT THRU A C/ A OF • U9-4 1-48 TH LE AV IN G SL) PLL LN . S E 1 26. 24 FT TAP ON S
N OF EIN RR R/W Th AU; A CR V TO LFT - ALG SD S LN CFR W FiRS N 49-48-1 6 E A RAD OF
OF-31--17"-19 I AN GE NT.-ON -SD s._ LN -UF. B N
R/W li-i CONIC; ALG SD S LN • 71-29-03 E . ALG A LN 50 FT S-'•• ''.• OF C PLW EXISTING SOUTHBOU-ND :.'-;.-. .
1RACK 826 56. FT TO W LN OF • •• • SIR 18-2 3-05 1fri S 01 -0 1-27 N 2599 FT ALG SD N LN T H
-tus-15 AL N LN CIF b50 • FT OF SE 11.4. OF SD SEC. 13 A ••• • DIST OF 2261. 41 FT TO AN ANGLE
..UN S f• NOR Y.. u [R_2 R _ L DS._T_H N-33-07-25- W-1 5 1 F T 0 AN AN GL E PT-•TH -- •
g 27-21-32 E 3 H . 32 FT ICI AN ANGLE PT TH N 83-17-25 W 171 .17 • FT TH 46-22-22 W 324.66 FT •••
FH S 72-37-52 W 7 bo 33 FT 10 TPOB LESS CIM RGTS • . . ..• . . , . •
. . . . . . , •
. .. .
W.`
•: •-- ••• _
Wt.::•. 2..te . •T
,. , . .. k .
.,...7„,..i.,„ L: ..,,., ,, .,0. 1i. i
. ,... .
. . . .
_ ' . .„
,_
J a •' /
:, .. . . .
i ttain i...-.:-11
r".- , . ! REAL a'ms CON1tACT - ,+ {
+Ts^M - :'• t{ 2S 12 Tt1P mad }9k IIACT.nada metered into this _ ad Aoaust . 1
, 1 1900.betimes 1ICWIL least.O 11811.set as as disideel bet solely Traitse • ..
' - betimes.(the proparty s!QICNOD.t=lii+DIEZ. IT PAUL AND PACIFIC EAI11tOkD
3,... y', N COIQARf.Debtor. being in pomeeeaias of all the easels d property of said "
�
i .' ",. Railroad Company seder authority sf the Dotted States District Court fur "
°• 6 tie Northers District of Illinois, Easters!deletes. Docket No. 77 I ORS
! is proceedings under Settles 77 of the Lakruptcy Act d pureuast to Order
yY _ ., No. 349 of said Court sutured June 23, 1930, hereinafter called the'Seller'. •
#' *- r d J1t01 It.BANSEN, ISC..a Washington corporation, heroineftar called the' .
' A "• V I T R I S l R T t t
Y.`-,1', Th_,• - a I. e the Seller egress to sell to the Purchaser the Purchaser • • !
x' Plt f agrees to purchase from the Seller approximately 21.26 scree of reel estate , -
l.4..... - tin ` le King County.Vaahiagtoo asau d erib on Exhibit A attached hereto mad./�
,5 ',;y,'-.-.. • t 1 i made a part hereof. hereinafter referred to as subject real estate. ..
` ' I i The terse d coalitions of this contract are as follows'
,
r • '-. 1. Ilia purchase price is'NO ROIDtID SUIT FIVE ID SEPO • t� -
4.1.7 ',_ ,-.'�• , () =D�T1IrT dID t0/100 DOILRS (0263,730.00). of NMeb oQ gun=IIPIT , , ' "
,f " 7 Thom=AND D0/1o0 DOLWS (1150.ODO.o0)has been paid. the receipt of •
w'.V* `l,"n 4 stick is hereby acknowledged. d the hel see of said purchase Price shell
k ,4{}t ',-.,".. ' be paid in ea®al isstallseute of PIM SEWS TBWSA11 COSTIDIDt1 SEV
ERS _ .
~ ;• ,: mR and t0/100 DOLLARS (137.673.00).or more, Plus interest at the rate sf _ .,
, _ - i(fteeo parent(15%) permsa 4lei id d
so on the e1 smpa prispal .
1 - a y, balance.over a two-yeer period. or leas. the first ef much meal masts
•.r .�, •
p ls be due one year[ram the data of this contract. " " ,
f
•It' - - 6 40 co cry S0J0902-0 110609 :E ' ,
•
EXCISE TPA PAM RECG F 1:.5c,
tr. - , ` CpcHSL 4.++12.50 '
. t SEP3O 11
y ! ?1,,.1r:1 1
!
•
•
;' . }.•^; .,4; char j, i Y�. - . , • r , '�'kt .
S. data Porebaser @ball
z/ pry.p a daligwry.all tunes des .
en or after eloalas data. together with all spur'al assessments. laclsdiag ,
.., • i water charges. if eq.and rag other awes:ate of whatsoever seem, , `
",'yam, ! i levied or assessed epos or against subject real estate. and shall flak
' Lr: •'�
I.the Seller receipts showing moist of such eat r assessments before .
{,..,m daligoesey. _
,•t. :_.
✓. «. .i,.. j'------... Y ]. the}archaise shall pry all coats dg ts a expenses of this sale.
l'-;; T NFi excepting oily boundary survey. real estate commission and Seller's legal •
aye µ> '' t 4. Purchaser awes all hazards of damp to or dsstrurtios of •-+
'- a may improvements!levee subject reel estate or hereafter placed thereon sad
, t. « , ,. • c of the taking of subject real estate or.aa part thereof for public use. _ ,..•'
end agrees that up such daage. destructico or takias shall constitute a y
" a failure of coideratiom. la case any part of subject real estate is takes
. for public use. aq condeeuation award received shall be paid to the Seller
a _
, �.' •+;` ad applied as payment co tha purchase price if such taking impairs Seller's
cyr . . '' se the« security.but otherwise toPurchaser: mad. if such iapairs Seller's .
•
r
• . security.Seller m elect to altar Purt►wr to apply ell or a portico of y
each oodosatia ward to the rsbuildisg or restoration of say improvements . -
' damaged bysuch taking. is the coat of damage to or destruction of ay ,
, ►alding or improvements. time sane shall be promptly repaired. recouutructed -
M1
"`- ,--t sad,s restored. or removed by W Purchaser at Purchaser's a a le et amd •
s, . S„ .�- g S. P■ttharr agrees to pay W settee test of any Wintry spar
,pr' track it say wish to coostruet from the esiatlmg Chicago.Wilesuka. St. .
. R Paul g Pacific Railroad Compaq tracks adjacent to the aortharly aide.of. ,
• r. P
,,, ,; a F subject reel estate. Purchaser also agrees to eater lento W gurllsgtom
t �r
x' e - i Northers's railroad's or other operettas steadied fors of construction.
r fir -- ariateoes and n opstiom agreement providtsthconstructconstructiong for t constructionad
es
. . ;___ ,future aloteaace of meth spar track at the express of thePurchaser.- - -.
}.
• r ! Y 1. 0 .! �' ;.n r. .. • '.•hat'. •-: w. -...:y,�.-` ..,;.. - .
, r • ' ,. . , =
•
•
• , .. • •`% ' .'� 1 .
•
s iuYx, , r 1 ' v
r r "4.
sFF.
", .# - Ie.. -!Ern:.
* .
•
k r., + r S. Opoa felflllamst.f this tomtrect. Salley will reserve a 10 _ Y
r.^.:.:+ +..61s ^' +..,f:wi:+i4 C 'C..
� ,�,, `'M foot wide permanent seeawet fur sea.rLtsasee mend rraaral.with right .^� ^' •r
¢` "�'l "W "? t of acres.of feller'.ceesmmleatiom l!ms ms It anon exist.across subject .rrjex" 44
kl,..X " , O� real sates. i[at cos tadrre des. Ilrrehesr, hi.smessor,or slip.. �.. r ,� t `
�.,-. I.
Y + , desires to relocate said communication liar. ha will do so at his emporia s+ -�,' *. '
"' and if said communication lams is relocated on subject real state. Instead
.. F ,wr, r o of on adjoining railroad right of way. then Purchaser, hie successorsor a
tip" ... r 1,-,' '''i a assigns,will grant a permanent 10 foot wide easement for the new location. ry-`I
t..z..,.a 4,,4-- 7. Purchaser agrees to protect drainage across subject real ;. .
' / - :r.. state in a manner approved by the City of Renton and acceptable to the - ,• 3
':
i:S Seller's Division Engineer.
'
JY '�t-f ,yam' S. The Seller agree.to deliver within a reasonable time after s
the execution of this contract, a purchaser's policy of title insurance in Z ,
•
y • -� standard fora. subject to all exceptions contained therein. Insuring the
Purchaser in the fall amount of T00 EUEDIED SIIST PITZ THOUSAND SETA ,
<tit ' '=D U,TITTT 1RD 00/100 00LLARS ($265.750.00). Said policy of title 1 .
r .
'64 o-i^ --4 '4 insurance will be at the expense of the Purchaser. •
• `
.
i
- _ -t, . "e' - !. The Purchaser rhall mot.without first having the consent is
r .
" writing of the Seller, assign this contract or say interest thereunder. 4
;. ''^`e•. 5 10. The Purchaser shall and will protect the subject real star .
#t.Yx
i.M from and against any and all lies and claims of lien whatsoever arising _ _ •.
, ems t: `.r,..
1 eel . a,. :,--.
y. T"b' from or growing out of anything done or authorised to be done by the Pur- - A
: - ' • ':4.+' ' chaser.sad shall and will indemnify and save harmless the Seller and the ' ""
41x ;,,fie. •-�e.:
subject real state from any and all•such liens, claims of Ilea wed costs
+.. _ - incident thereto. The Purchaser shall a hereby coats and agrees that r .
;4 ,..} , d ss r Purchaser will release. Indemnify and save bemires the Seller from any eel
ear, '� all liability, loss,dsagee and elaims for damgs to or dstrvctiom of -
y ',�', .A,''• •- ;property.whether real or personal,and injuries to any p.res ar person - •.
': • •• 'wboseoever,whether resulting la death or otherwise. table to the ^
ii.... 3 condition of subject real sate. .'
/r' - - 3, ,
. ,
•
.Jrr .
.'::.,r.21''', ,l;fr.• "` •`.'�y`s"x, ,» r - `� ,.,t' ,
,
-_ ,
;* • Y.r
F I
•
•
`
* _ I
TTo•sps totq sopwots pow soda A •awssab stop so ostawttoaooa pow
• .aaat• ol sa,p so swot,too ww=nos sop • ta stow 4 pstptaslo eatagsp 1 . . i
ps
s•7teajwl o/ q tiiego tef 7aogats estop,In tsI"tia Ito,I , ,.;+; `
OW
N.
' spool Tags •oataw anataa VIM is Motif qa asap •aoogaast qi if Ion o
•aw.a,,Qv0 aota,ipao piss a I szoopossos eaeta,I Tito mottos q7 .,silo, ' ' '
' IT••la n*WI soap•6Icot) Laatga is rotted.ga otgato pea s ass,
...-
interim so strap*stew soot=amp teta•as pow•so,awga'mow qa toots I •
^ ' ...Pods•stoop* to to I awgaasl NI cota Sloa ..t salvos oast Ass mottos .,.. ,`x'"
. i - sups •/Toss°°sge. mason•eal,age mason Law aopM iw of Ltad as •p;naM,i '- ._ a' ,`1y.
j _• ` .+:gig ••
.. wlgotaq a sap tin Tien wooq
`
o i o.T2 qi a,1pd,oil aasgaaat i - •
•
-aftos q
wpm n NtliaWs smug nom at Any else Gottg ssog
tin s saZ0
op moss sop ot .m000satw ems.t ewoo an ego to Of sopa "it ' - ,.
•age r:� hYt.
g
,oapso to lift asvto let n• g u tta ioao5 ,avows TM,altos•gL• '. +• f
'Nona 1•acew it
age sogaege•Loa fa 7gtts to,sasssos co pus'ssasgasat r "
1
matt h M 7 aarra'• a o pmi so Isasplse sw,aq�uoft its n sop a tg! •. o
p=s=q q too•iaq popeNos ssop,uawa
p=,sofaatsasa•,7osae•ge a,+,.
ITs n aaerga•q Tigs Peer Plot •now twos a.rgos So woo/sass to f!
pap.laps ob 7.sta1lion pre psi a anogaml qa n watt*iigs asliq 11° - x Y 1
- swage ego •we=:olaod paw moist its'gas.soda ••sipsoasg o,olawttigs t u _ ,
" _ @saveloys/asp aowsa1otasd TT1I a•aesgasat nods a„gas,t so taoasts, '
., . , W*lain woatogosa •spawet•==sap gip sat •issen.elflolsaaso Non ,,,.',r
.
Downs' a p wtt-eas+t 4 moans opITq eln'p o �sal*,aaa•it yam, -: r°�r
, - pms/t• •qs•rigs aott,I 'iaa0eoa alga f•Laostt* t•p� ors pY S•e
. : - h �sssssln• eao •qaq paths l tosw•ta tge a aawaa toss,Peso ga,e " `" ,.,•V
lc
' Poll r islasd R7aad I••hill eoq IMP sawspsy IVMom Poe'Isla," ,
aagggt.aq ow wpm q n a•sawas 4 nowL.1
•g7 to no too,opal
—' ` somas'pm la 7.•dwl nap ape•M now asowgaagl q7 TTa=salt* r
' p R a ell fla
s •p. pa g•nage pia aa,M•OS+tit& •Tt 1 r.. .. w^"r '
' • i • •• +�
:�„'t
a- :. , '
ea ,Y T .i• a , , f^..' M-. ' •''', n_ , . • r . ♦ . • t '�.`,i. ... ..
tF.
1
1 `
' 11. t
rights of the Purchaser b.rs.der shell reuse and determine sod any peymmsts ate coven/at .f
heretofore made hereunder by the Meurer shall be retained by the Be11.r
the prevailing I
in Liquidation of e11 damages sustained by raesos of such failure. term *, -
of all demands. notices or other with Hs addition to curl
QQQ��� Pere peer I.such declaration of
party in obese
forfeiture and cancellation say be made by registered aril u the following It.
addHani - - real estate at
.Jobe R. Sasses. Inc.
1168 runts Point bad ' applications. p
Bellevue.VA!toll{ .
` under applieabl
or at such other address as the Purchaser will indicate is written to the _ '.
" Purchaser. at t
Seller. Or the Seller men elect to bring action or actions on any intermediate
performed Pure%
overdue installment or payment. or on soy payment. or payments.made by the
applluttea.
Seller and repayable by the!grabens. It being stipulated that the covenant
A. I11 VI
to pay intermediate installments, to inks fatermedLq pays is or to pay
Instrument to t
items repayable by the Purchaser are lndep.sdent of the covenant to make a .
,
deed and that every such action is an action arising on contract for the !
recovery of money only as if the promise to pay had been expressed in s - ` .
•
different instrument e that no such an such aetios shell coostitu election -
not to proceed otherwise as to any subsequent default. and ao waiver by tin -
Salter of any default on the part of the Purchaser shell be coostrrd as a I .
.
weaver of any subsequent default.
16. The provieiona of this agreement shall be biding spas and `
A
inure to the benefit of the parties hereto, their successors ad assigmet . - ,
provided however. that this agreement. or any right berate, shall sot be
�`' Dec
assigned by the Purch.ser, whether voluntarily or iovolatarily,except ,_. i
i
upon written consent of the teller and upon the terns and ca.ditions set
forth In such written cooaeot, and as ueigmaest made otherwise than as le , -
Ibis section provided shall be ma d mull a void and the Seller may at it. - . - .
option declare this ser.esent forfeited anderr ande avail itself '
of the rights end remedies hereiabefor,set forth. ,
sr
_s
y .Sang Y „y - r
•
fi
—__— --
,.. /PPM
•say y''�'
• )I -"I
";)' y , -,.
!_ •711 'Uflpl •I f89C • sip23f :i::w
• •- ill 44_
•
- , -, • di1100 7 sl,13311_ , rd L. , s'�•
t
. sop M -..:.. 1, ....+r ','4.i 1
4
f�•osTTR sills.[Pawt '7f 'Ste' a ,� *. ;.pit
.••l^•wipt•Aeal�;o Lisedoa sup : i-,
p selinaL sr[totes iM T•+7Hff'•f .t' s
' Erse IOU•IIA'Q90 'IIarYIDi7 ,4L. t,v,.` . .
. . 4 gawp eae peal; 'vs.(pure Lip sup
s idap upwu
aa7•ai, ' t'
eigi pgnases saeq gaaMq espies M7 •LOff7M!will II +ii �-'' w^'T
{ - 4
_ • gene;o'I•P sip of pa•aiooa eigi a•pas smp•lfiga••a•••galW P•uo;aM .15c.,71i �, a`C•-�s ,
r -: LTTe3g7T•I paw Apply••g•eol7uaaoo f a gaae algeee)o eap eqa 7••seeegasW .
• 'peplum/•Jaeeeoq 'peVia / 'enol7•P c
l s ie7a seaat pram eigealiW Japan; * z," n t :. -
• {..
,, seowo•g7 L4 peofle N q Mat+n4u geaanaa�P pi e••pfaea •00ol711,21idae �• '
iT•pulls,rearWile TT•g•sense •easodeS e�aaaegasy>•goes less; ti ...TA'7,,�' r.t'
_ r , iaerg•••Pfsf}!0•s•qf*R o7 NNIT•,ae••gam[7eise Ig7'I 'fT �#.,+", . ..N
*pawpaw el peedpnc poll sae•;semis el Lis•+ ` -:V'!+La
•
•ii amp stasesu ,M1.
Am f4rlipeuL„ s sM•l1 eeeaaae pow q plum 'h• µ`,`-_
4 •, el gaol s Lwuous aige•••ws•a Mtuliso M ID Luna Ikenpa•sa egi ry -,:�..'+ '-: a 1'
3 M4. ''
te lq iw0a La•iaeiisf q spa l•fl•Taai •iauiw elp 7•ia•aaeoa Ls, S.'
R , -
wf�pe q if••f•pq M t7sea sepia p a•paep op soap •Li *ai.
•
•
✓ - * . . - ' , it, • _ , j`, , Y..,.4C..i
• • x- '{4, - '- I• --, • ` + ^ • •fix. , ` w ' '1 lZ. ,•I
• .
---•• - -----
. • •
' ••,. .,'•
t , ... ..,
r Y..
[
•
J •
* J
' r
, w,
• i ,
• •
' ,1
' . 1 ••
• • .
•• a '• ••
••1 • a
• • •• .
' • ,
r r
•
• ; •
•1 • • I 1
.11 r • ,•• ••
T,;".• ' • ' e "a •• •
•
. . .
•
'.
•.. . ..
•
r !
•
•
a.! • .
•
••
•• .
" !!'
••
•
,a .
•
1, , 1 • • k"
•44.. •••
-7-
•. . r.0•,S5• ..
• a., • •
•
•
• ' 'al ti:''....' . 1 • . .
.. .
• 1\ii
1" ,417C1.7 i
•• ••.!!•.,
r" •
•• .
"1 t '• '1'': .: Til . „ , 1 1 , ,1 . ..
.. ..
, i,
1 11; ,:,..
,,,i-:• ! ill,.a'a 1 I . .... .1 .. - ..
N f gill.. v - ,
Id ai V i...g V 1 3
3 ....
• „ •.
WI
'1
. il - i 'll I alai j q
• .
, .
•• mil 3 1 NINA h. •••• iiii
3 k
1 11111 / ill 1! ••
•. ••••• a .
3115 li si
i.. it , ..
. .
., ,
11 1 f
If .
V a W 4 I ••
31 • •
. ..
, • 1 2 . 11114 I 3
•
• •• . ,.'.
..! •
i 1 $ 51111 1.11:11° f -113-
S al g .11i ...
.
0.40^
1 S
' ' , r,
L1 ., 3 ,i I i i Ii' : ii
I( 1 4,111, 11 , . :.
....
is 111 .... •II
8 2 g
. 1 1 .1.1. :•#:. . 1 i J111111 4
iiv..11.1. v
..........._______. ........ ..... .._ ...... ...... . . .... ....... ..... . .......
•
eg
' ' . -;:•
l.,,,.. ,„ , 1,.• ,. or•. .
1, •
r;a •,'•..,,. .4 • ;.
•vi. •
•'• clirlr:•Pr'..."-.- .. "•:-••...• •=,. ,,,,. , , ..., . . . .....,1,-.....,...-:,tzv-,,,...:,,.Q.-,:•.',:'..,. . . , • . , , . , .
,, ,
•
. _ ,''.-..,. -,.. •
',.. -', - ;. - •,-'• .4,, . +,-• ',, ,',-. , ,...'r. , .., '. . :: ,„1:r,.. • 4,„ ,,, ,,„ -, . . . „,, :
. - : ,- "," „- .f L„,,.. , ...-; ," -. ,,, - , • , , • -':4.. ,- "..' , . ; -,,,, , -.. :;,,, t.y, ,', .,t••'.•,?If . •4': ''' f.t t•'"'!4.4%,'' '• .;,
•
'• ' x io
•
. .
•
•
- • — ., t- % . • . EXHIBIT-A . . .
. . L . .
. .
. •,
..2•..,, , •. . . • •
. . .. .
. • . . ,
. .i,,,,-, 1.4.-C4. . ;
4011 stone Way Worth, Seattle._WA.
f: p:_77K ;ulna
x` 14 August e, 10e0
+r` ''" rule e0698
.' i Chicago, Milwauh.s, St. Paul 4 Pacific Railroad
*, ja4al OeeerSot o of Surrey 2. i
`I That portico of the southwest :'
23 Worth R 4t of Section 17, Township
;r
described • W. M. in Ring County, Washington
c
Rsgioning at the south quarter corner of said Bastion 13: .
. Thence r 00•38'28. I along the
`:" .: said Suction 13 a distance of e84 4 north-south centerline of
' ji corn.:1 of Tract 26 of Rental feat to southeast .
: ahor.laee. Second Supplemental.
Thence 6 72.77•S2• r along the south
' : j 26 a distance of 382.60 lust 'of Bald Tract"
Thanes I 70•54•02• r along said south boundary k a distance of 77.50!ant to theof Tract 26
•
s:,' Brownell Oonatlun Load Clair b. 41 sad of the Charles
bagiaulagi the true paint of
* Thence continuing r 70034.02. r along said south boundary
of Tract 26 • distance of 281.02 foot:
Thence d 77•56•01- x along said south _ +
, a distance of 130.0e feet: boundary of Tract 26
v
6° r, ' Thence s 41.16•07• x along said south boundary of Tract 26
u '�', �� Ring
7 .18 !ant to the north boundary of • tract
County County and desosibad under Ring
Auditors rile No. 6607786:
`; a Thence westerly along said north on a curve
";__ of 6&7�46 feet so arc er of distaeos ad u4.7o lu r havingi radios
" rti central angle of 39.41•39.: feet a
" ?hence North a distance of 25.00 feet along
,: boundary: said north -A
Thence a distance of 2e0.69 foot
along said north
:t { Thence 8 39.51.47• x along said north boundary a distance of
.
, t
x,ir, 1.
: ,
� . , . .
...'1
-..
. ---' ....
. .
.. .
•
• .
. . •
.. .
• .
. , .
. .
. .
- •
••-r.-.. f•-•••-1;......--.= - • .• ' . .
. . .... - . . .
.7,"*,,. ".. . -. • • „.
-...-. - _ . ..., , . .•.
t.---4, • ,,.,,,, ,.
• ,- . . , • .., .... .
, .
.. ,, . , • ' .• . .. • .. .
•
. . . . .
,, , •
• , • . , . -,
- • ... . . . .
. -. .. ....--. •,... _.
;44. *••, •, . . ..„ .
- ....•,._ .,. . . .
. . . •.,.-
, .
... ,,. ... .
, .
•,..,,i--...: . • • • • , . ,
. ,.„.,
. --
. .
. . . ,•
. .
. .
.•,.. ,, . . ..
. .
. .
, .
. ..
.. . ,
..„ - •.. . ,
..',4—; ,''.-- •• • . .
. . . . ..
• .. • • . .
. -
.,,,,, . • ,
•
* , '4,„•• ,• •.• • • • • . • . •-.. ... .
. .
OeUeription Survey 2 coat'd4 ..
,,,
377.52 feet:
. . , .
. , i
Thence 2 741'13'19. V .along said oorth boundery a distance of - ' •. .
443.31 feet to the northerly mania of the Charles Monster
. • ..., . . Comity Mood; • , - ;
• - .
..
4 1,-- • • - r... , .
- • '‘-') .- :bone.i 34'10131. 2 along said northerly margins distance . . ..
of'43.44 feet to the mouth line of the aorlington Northern ' , ''' •'' ,
: i'' :- •",--• "- -Railroad eight of Way;- ,
. . ,..
. .
Stenos along a curve to the left. along said south line. the , • .. - . ,
center of which bears X 060348410 V having a radius of 426.00 ..
. ' .-.
feet, se arc distance of 45.43 feet through a central angle of
03044'25* to a point of compound
*. ,.. . , .
Thence along a curve to the left, along said south line, the
, .
castor of which bears V 10,12101P. I having a radius of 1,055.00 -
. . . . .. .
ar
feet, as arc distance of 249.25 feet through a central angle
of 11024000. to a point of compound coring
Thence along a curve to the left, along said south line, the
center of which beers X 21843,14" II having a radius of 727.00
feet. an arc distance of 214.77 feet through a central eagle , .- . •
of 14055133. to a point of cogpound curve: . .
, . .
Thence along a curve to the left, along said moth line, the
center of which bears V 34030940. V having a radius of 1.571.00
feet. an arc distance of 204.57 feet through a central angle .
. , .
•,',.'r =•• .7! . of 07032'02. to a point of tangency: _ ' .. - -, •
'
i:.
Thence V 43049909.2 along said south line a distance of 97.17
fest to a line 35 feet southerly of and parallel with the - • , , _
- : -•-,A ; centerline of the existing most southerly tradk of the Chicmgo„
,.-,.. Milwaukee, St. Paul end Pacific Railroad Tracks:
Thence along said parallel line on a curve to the right. the
center of which bears X 42•4341e. X bevies a radius of 4906811 '
,
,• • „. . - , feet, an arc distance of 40.09 feet through a central angle
of 03.17145.: .., . , ' , ,
.• , of , :".
Thence W so•34/27. 2 along said parallel line a distan ce , • •
248.50 feet: . • . • .
•
i,--, . . ,.-
Thence along said parallel line on a curve to the right. the
center of which bears a 39025633w 4 having a radius of 671.5S . •
,,..,-4.7 ,, feet. en arc distance of 93.64 feet through a central angle , .
. . - .
.
of 07,35847* to a point of reverse curve: . „
.
4 .. Thence along said parallel line on a curve to the left. the . . . . .
ft w cent= of which boars X 31 of°21946. W hailer a radius 424.14
.0- • ,
• feet an arc distance of 73.32 feet through a central angle . . . .
of 09044004. to a point of reverse curve: .
•
...
EXHIBIT-A .. • ,
. • a. • .
. . .
)4,7; •*„•,--i, . . .
..... ... . ........... . . .
't`-=' "- . • ..
- ... .
. .
... ,_ _ •. . ..
. . . . .
. .
. . . .
, • . .
.. „
., . - - . ., • .,
0,
.: *- •..1' N , . .„, , ,
_ ,,,. •. ..
•
- I.
�L, `1 F e
•
•
I
-'' ' Lr 'ram _ `• ••• •1 - F
: .• 1
Iw.�* N.;S. •
.;
1 -
I
74.-..i::- I.'" ' . j . " . t
,-,,1:: " -.fit. 1 . 4
ter+:: A'-, ,., -,.,e i
•
A liar for k�Cic,�d d.it,�uoc[GO
41/1,1^•'.-t .kr, W .
._ Knew crosamuaIe
��fwocu•Ut w '
R'•
l1 44,%.. Y '
.y.. .. ..
' it - •:, ��
x
ii-
•
ti .
{;i + s.H- 3 .fi.;. �,r+.< _ �. k`.`S ^n xr ' ( cam. i !,-d^"x>;".v *. r t
lit, wi 0. ME 594 Cont. 10,616 S�. . 3 � ;' ..4.
•
il . . , ..., , -
s EASEMENT slack River y,._ :.:
The Grantor, CHICAGO, MILWAUXEE, ST. PAUL AND PACIFIC s le'`�, 'g
RAILROAD COMPANY, a Wisconsin corporation, for and in consider&• % . ,
- `' li i=
tion of the sum of One Dollar ($1.00) and other valuable considers {_ if p,io gy,
•
tion. the receipt of which is hereby acknowledged, conveys and b s �e 3•
quitclaims to KING COUNTY, a municipal corporation of the State of ` ��,,�F,
t .-
Washington, hereinafter called "Grantee'', and easement for the - *:'1 ._'
construction and riaintenance of a wing wall not to exceed elevatio • `. + ti . e
,• ra
r •
21.:. U.S.G.3. Kean Sea Level Datum which the Grantee proposes to ;*�x` `� r
construct in conjunction with a flood control project. Said ease- t ,^4,y "' '',�'
�- L'•,
• sent shall be across and upon the following described property to- -` a:c;;'
6 -7. <tV
r
%
,y"r` catee in `ring County, 'Washington: Irn
A strit of land in Tract 23 of Junction Addition
5
to Seattle and in the 33' wide platted road •. •. , w
northwesterly ::::::e:r:::::3.
23 feet in width. .' ' •� fi• *`�
r being 15 feet yafeet westerly from
the following
it-ginn'ng at the southwest corner of Section 13,
Township 23 North. Range 1; East. :..I!.: thence . :?
,rith :7°26'431 ast 940.77 feet on and along .. - "a
t• the south line of said 3ec:ion 13; thence North • . ,,
yl fa�
crossing the Monster Road, to a point identified +• � �
L�
oy Washington State Laabert Grid Coordinates _F*
41 (North Zone) as N 176,811. •0 =' 1.651.145.00.
which Is the true point of beginning; thence 1 r s ' ,--
:forth ° West 2J0.00 feet to a point which it '"
descrioc3 oy Washington State Lambert Grid Co- ,. ,u''f�;" «,i'
44' ordinvtes (North Zone) as :1 176.i64.21. ,.; .. :'i3 Ms
F 1,_•51.:lc.1.!;. containing approximately L. r , ,s!rm ,- n, ,�.
acre. y` It Ll ''`'" :t1. xz;'`
:he Grantor renerve3 unto itself, :.t: eucce::sor;, as- -p.. �... e � ?,
,, , tenants and licensees4 the right to maintain. renew. ,•.3 F ,� '4
,,,L .. c_ _: aria develop th existing railroad signal •i nd co:-;unicn- r
f
:3r. lines which cross'the aoov described parcel. if, the L - 4 ; •,,
7an:traction :.I . wing wall u_)oz the above-described i.ro:.arty oy W =!
4i' L,t. • 3r,ntee sha11 necessitate any change or relocation of the �. {- ;1-
3rsr.tor's raid signal and core,unication lines, the Grantee agrees ,^
is •
c toa5 the cost of such change or relocation. ' '"
•
:. '?
r 1 y -,,
n
!• ss
s The Grantor also reserves unto itself, its successors,
IA
Yk. assigns, tenants and licensees, the right to construct, operate ,,
+ .{. and maintain railroad tracks across and upon said real estate, 1..
3' z „ v and to operate trains thereover. _
�- < y CA
w A':y J IN WITNESS WHEREOF, the Grantor has caused this instru- . '
1," t : ment to be executed by its proper officers and its corporate seal `;'
to be hereto affixed this 25th day of February , 1970.
,•,',. ,,� vie-r, • ,,
ham , �t�� CHICA(i0, MILWAUIir'.E, ST. PAUL
4r .' AND PACIFIC RAI OAD COMPANY «r
f..• • '.I„• •t. ' . c , a 4(';' ,''. . ,4.
i.4 , "s;•ti .--` - • 'L C.E. CRIPPCN I !resident `:
,r e .• 1~"C.yr- CI.. ,,:.,m retary ..NhL
else• G.E. POTTINGER r'
ciy _ :,It :47
Vis
4 F C 3T.i's C ILL:ii0I... ) it
'..t,: ) s s. •
,, County ofoo� ) '1t.j
t '_} On this 25th day of February , 1-iJ. ueiore ne if,
j : personally apc.eared—C_E_ [RIPPER and G.E. POTTINGER . ~,
-" • to _.:e ..nown to oe the President and Assistant ecretary . ,,
i •.;?"' ) M i t resrectively. of the corporation that executed the within and
''* ; ' a ! roreerin.� instrument, and actaowledged said instrument 'to be the .
- AT *mkt, free and voluntary act and deed ofthe corporation, for the uses
-, v 1 and purpo•'es therein t:ontioned, and on oath stated that they were
, -; % J I outhorized to execute said instrument and that tha seal affixed
,fitcK, .A\ 1 :s the corporate seal of the corpora''on.
a.' „ v1 I '"Li: Ala'::.33 i _J0.•', I nave hereunto set by hand and af-
StV.','ri` I _ _ e� , official seal the day and year first above arritten.
1 e'
.40 -./.,:., R; (.44/44."4,4 4)• at:4124a^7r" ".1-rte
.., •. _ any Pup c in s 1� 9 pit to
t-az ,,, :t'�..1: F:1 '` ..... .. .� - ?_d-----� i Illinois, residi t (.'h ,'
i
�wt r `gyp a..� 'c.:•, .y commission e:^ir 0
r / /6�
f �a't c Y r a�t of v!1h,1 N. .:.44N.ig•
vli.
"14 •:* "'.,:rr - 2. r.i.d 6,,aseg&e..,•5 te7D hz vell .
'�; +`' IDWARO : lac dr -
,. 3' ,'
t
•
• I
•
S E,
3;; ; DroDVir a�f 11 E
y ,k DOSE TK INN so 'Y, ._.
•
• �'.« TEA CODAACT.ads ad Mter'ed late dais day of Darnel • I - • `. .• o
I.•�. - _ .tJI latomp•totems atom OQILTA.set as asdd as sat..lily t j,.
;,. ,}. Trustee.f the pr•P•rt1 of N.CIAOD•ImJNON. IT. MOL AND PACIPIC YILDAD
4 - Ix a e+
_r ° - •i ' Cas'ARr.Defter.bolas la possession.f all the assete ad property.f said -
• i Railroad Company seder authority.f the Oaitd States District Croat for
•` . .•%,"'� •.•` the Northers District of Ilalaois. Masters Division. Docket No. 77 a/fPP ,y*"'
• ,f' la proadle s ender Scotia.77 of the lankr:.ptry Act and personae to Order
1
` W+ Ne. 3i!of said Coat entered.tots 23. 1P40. h.relsefter called the Me11er. ,40" - "`.'+
and If=R.=ME. AC..a:Whinge=corporatica.aersiaafter called the •
VITERSIRTNI .
The the falls agrees to sell to the hacha.sr mod the Purchaser.
- - egress to purchase !ran the faller approximately 3.10 acres of real estate 1 ,
la Rise County.Washington as described as Exhibit A attached hereto and - •
fi,
' 1. !made a part hereof. hereinafter referred to as subject real.state. together •
ti-
N ,
( with approximately 2.7E sass.f Rallrod track r the subject real estate
+.•ti
L • d r Der1lOOeten Derthep pleat of wry Wlalas. It helms the Ltrefw
;y r -
hz.{ `, to.owq title to all.f tbs./idler's track and switches. latludlne all .'
track material a rallroed ties located between Darlington Northers Railroad
" � d oc
�1 Icicles SD6M0 at the east and end Burlington bortber.'a Statics 7g+2S at ..
. ,•• ... �-• ;W west sd.
• r - • v The term and cooditta.s of this°Detract are as follows:
1.. The purchase price is DAaTT TWOOA�POOR IMAM= MID
4, . { 14/100 comas ($10.400.00). of which PUTT TiOOSAfm Alm p/100 00LLA
- .• the receipt of uh ch is'hereby acknowledged. +
. � �(iSo.000.00) sea bar pall. •
;, ` r `- A )wed the Mira of said purchase price shall be pall in droll tsatallaesta
r-' lid TNIJTT TNDOSAes TWO MOND:CD and 110100 DO[LRI ($20.200.00).sr mop. �'` '
II,'lIt •: 1...• ' ' Wean plan tatereet at she me of altos • ert ( i f)per MOOD . - f
' -'1-+ - I 4 ea the declining said prLeipal'sleets..ae ar r•tee-ye period.or less.
the first.f web an.mal peyesuta to be dot INN year free the data of this
r" • , "ry - ! 1
, . ter�mro�ar�t>�•-.•r- '�•„ _ - .' _:�•• -
.44
' _ - -
•' Y �" ..1#•« •dude: 't l O i •Y , _ ' +.. _ «,...
A ' ` r i , ` ` r ` `.
L v # # ' .#.i
'41-.:„..i,..r.' ,.."'....'..:"...'':.,:-11:',-,::il'::'",.'''.i.4;i":4:,::.:!:•••:*le..."',..1;..1. .
•
- _ •�Pw+dr+TaoMT�T awq.T y .J
� w
Tpela1 'aeeseust east not weed mpoluupo annuasoa Ftstwa test ';..5 "
_ . sepa not aw anus'wpa aaw and W R a a ze •asa 0 eg so• 1 'aasgaae a i^ '� ". , + =.LY r.4;
. soafo11aeel oa TTn ran asn um 'Lunen sesfpns wsgaand oa eaten nape, M•+,: '.,. Iv
' ageq aa•agasnn soat awn n op aI '01$T la seer mu;swig see poi ""'"-` t i;
_ papal s sop Laadoal infirm
odad 'lingual
peasant sop gria/oa nip Ra 1 `..•7 •• ;.w!-
• • swipe as'MI uRaa01 ssq*+TTarO ZOOS,oa snapassapaay •S 1 •' ••' �., .�,`•-
• '•. I pee test stop eeasosgany>•aossgaael Ra Lq pia age'lozenges ; 1 �. , =t F :
�• "• i pgu aasmasa •peaTMsa LIadsoad R wen
u nu lnlooait se SeT►TTeN. ''"/,'4:'= ,_
. Lee p o0Taroaanp ao oa deep 10 awe opt ma ',eppa low Aps p "` " • "t. w.
s _ . wowm+odef two Jo Jo wtaoa se fq►Tiegsa wee oa paesm �ssTanpewa lw *' ' ,
- 10140143011 s ae Tp SW.as sanpaaV nous a0 tests ups ! '
. - asTTM 'LZTaeeass
.'.s wants*undue goes 1f 'pm Tasosp IRS w aasj a twaR M ae a 'LY Wnass` ( r +. , ''
- saaeTTs1 saTsdti Semi gar 1i stead aRaad Ra r amend n pTTjb pee `c.'
naps Ra R paid R nine psstoasa panne soptowpoa Lm .on aiTpd ao1 ,
__ T VOWS Ol Man pea ankles 1s and Am ono sI •m p00 t2Keew Jo gam' - "
s w ealesea mg ,at#a s.setaasaasep !essmp lw ow pup noses pm _ ., >•
•w angel ao1 j5Ra end Sue so M u an ages aasiae•no,egiq R pia ` •
pm walla past/aeajtu5 m Inga Two inked men p______et Am - '
p m1aaatanp sop sperm so span Tie stew=asssgasel .1 tif, ' : r.,;- $*., ,
;
twin seseTp pm g p wwta.Tam onus
s pea •b R raes Laspm tam,npabxs d *'.
erne saga p essssb
' pow saw ago Led 1pla awRanY s71 •i • jjz
seem pwwmw pop NOW143 lw p amecd fspnls sa4Tsaea a4TM egi ei —
TTwn pee•eaw7e p amigos
at aes townie aed pane
s es se plan :_ "
.. '
sinus asssenaRe pie sanumwmeg aae Lm pm•Lee w
1p • ,ala arms ••'= w "3•
Tp g
teel• eeleeme amain age laps aRae,si 'Map mop a•m
r
+� 119 mm7 1r•00,01.117 q algal•t•i LTA+eaaWal sit •i d:c _
i t gc te r .
' G. If the brlagtes brtYrs'tec.er Seller dens mat purchase --'. '++ '
zw, a `' wedded property a accordance with p.rsarsph$above.Paeh.wr/4 ens Sr
f i 4•^",",• mote all.Sr porder Wear.at the l.I$dles at railrad track described -n M
°ji. }. abuse, provided Pardoner rears lets/srlttu at*s+/w!with wallattr - "`
i,. 1.
+ '' c w Northers lac. te cover ass sd mefatesaste e(W tracks locatd es Branton :t..
- <- Northersw lac. right of way.er else maca written agr Bart from Narli/itos '
a i Northers lac. to ester egos brliagtos Northers Ise. right of way for the .
��'*+Ny� purpose of roaring those tracks from subject yaopetty.
7. Purchaser agrees to pay tha stirs cost of any industry spur
s4-tom' am I_
'�tt, .r tract is say wish tofrom the u
construct from creche a os or a/�aeaac t _
' L i rsubject real urea. Purchaser also gtwa to ester Leo the Fali�tas
_y',4' Northers Ine.'■or other oyeratiag railroad•standard curs of coostrwetics. ; v
,4 ile,_w'yr: maintenance and operatics agrseseot providing for the construction ad
of W purchaser. '
ti'*4711 ^. ' focwre riatsoanee of aae6 spur track at the upeow '``k�R'-`- S. Purchaser agrees to protect drainage across subject real
: A : estate la a dinner approved by the City of t®too ad acceptable to W _4,2—
Fir.»++@'+ ;" 1 Speller's Divisics Engineer. .[,;.-`.
-s. ^* p u
. The Seller agrees to deliver within a rsosabla time after - + `4
- -1h '7..
tees sssrstics of this coneraet. a yuxheser'a policy of tltla laauranp L
#` .eadard fors. subject to all esceptiome costelmed therein. Louring the
f '^ ' •r• '' Purchaser is W fall amount or SINEW TIDOS=WOt NED/ID AND 1A/100 ..
'C t k ' I
;' ;loiU1E (ip0.400.00). Said policy of title issarance will be at the cponw .;^ -
F
' e `, .: "of the'orderer.
-?- ' 1 10. the purchaser @ball met.without first having descomsat is ,
writing of the Seller. i
Seller. assign this contract or anterest Wrs'odar.
':_. 11. The Purchaser shall sad will protect the subject real estate . ":$.
'.4 dand* teas a against ear all aims s claims ef lies whatsoever arisia .r ^ -
44. a 1;'..;� 'from or gtowiss out of anything dose er authorised te be dons by the per- -
A ' - +f ' `7` 'chaser.and shall aid will idesai(y and save harmless the Seller ad the f
fie _ _ ,,.
y�4 t .
++yea,
' 1 "
.
- +.dam •. ,.
. .
,.
..-. ,
.._..,, ... '
. .
. . . .
. .
•
. .
. .
' . .
• • . - , '
. . . , ..
. ,
, „,•
,...:„..:• •';:.''''1,.'r ; . • -. M. •
. .
.S.,;,,a'','''',-,,"'^' - : '''''''*.• ,;',,,,, .:.,,;,'F.'.. ,,,, -• , • ''. , - ,
..... ''• '.• P....:.1*.i.:wei.-. . •
- . •..-.•..' ,;',.5-,7,s'.....t,•':-....'",r"grt•,;",,'. '-'..ii r.':".-,".. .,, ;.[:.,,,,•-•,,i' ;..'S ,
. I .
;', • I
•,,
. . . " .
. •i . . ,
. . .
n •
. i . .
. . ...
...1 . • . i ..
ti ,1 • • . .
• ..
. . .
. ,, -.- •
t . ,
-• wake. tle
@abject real estate fres any emd ell..ck I1ene.elates ed 11ea nmd sate
i .
.....„. ' end if the
1!miasma therste. The Ps:cheese shall smd hereby campmate mod epee'that •
Purchaser will relate. isimedly amd ewe tamales,the Seller from supamd maid thin
. .•:.;
, detai m
•
all liability. less, demises aed claims fit damps to er destractims of ' ns
1 & .
q.1.-
. . 1 k mad cancel...., pervert,.whether reel Sr veranda.and Injuries to any perms er F.T.LMS . • .,...:.. ,
; • .7., ...rights ef
i iwbonsoever.abether resettles la death or°thereto'. attributable te the
. . ..
., .4 :heretsfere
v:adieus ef.embject real estate.
i
In liquid'
...
12. Title to subject real setae*shall be mod remain in the
_ . _ ..... .. . ,- .of den
,
. astier until the Purchaser stall hews sleds fall payment ef said perdue= . all
i . ..- , -., ? •
forfeiture
.price and all of the payments by Purchaser to be mede as histilbefers ' . - - ' .• ... V L,..,
' . rr.' 'addremesi
!specified.awl mail the Parr-baser Wall her.hilly sad promptly performed .
. "
. ! . , ...
each mod every commas and'greenlet comtalsed hernia. Contempor .aneously • . • • 2"."... .
. . • '.',". ..
with the eignime sod delivery.f this contact. Seller ehall mike. up i mod . .... .
• . er st: smcb'.daliver its performance deed to be held in escrow by Seattle-First National ;..71
-,i . • , . .
.. -,., .. .. .clank,Netropolitam Stanch. LIM 4t1;Avenue. Seattle.liiishisgtes,S101. far Seller. •
•
„ • '
'-delivery to Purchaser up..Purchaser's full perfremence if Purchaser's overdue 1.
, .
i . .. • , • ' amd obligations bersemder. Woe such fell payment and performers.the escrow - Seller
to .,int
bolder shall deliver to the Purchaser.good mod eafficleat quitclaim deed to.
•
'Jeans raps
„of cosmoses of"abject real estate. Said deed shall be subject to all .
• •
. . 'deed amd t
i . -:covenasts. restrictions and reservations contateed berets awl te be sasemed . '
•, •
'recovery•
by the Purchaser. to.11 liess sod encumbrances suffered or incurred by the
:.differeat
Purchaser sod to all easements of right of way,whether or mot ef record. , • .. .
---
: pee ns seller shall reserve=teasel rights.lot withuat right of surface . • mot to,. t
. . teller ef
. 1 Mall. . .
I- !
li. Tins is of the essence in this agreement. la the sweet the . , .
:-
.
. ,. .
,
a .
..
i
;eadlver of,
Perchaser Wall fail to sue any payment herein'pacified to be made hp , .
I
. . .
1 . .
. .
- - ,
• ;Purchaser promptly st the time the sans shall fall des as bereinbefere • .. lama to t.
i .
•;specified.er promptly to perform mey covenant or agreement aforesaill. the . • . provided Il
, -
l.11.r may-give entiee in writing S.the Porches°,if saltdefault. ',mi..-- --- ------ VS V , V
--
'.
, upom write fying the nature thereof. amd statism thee unless said default el defaults . . . .
,are . __
.
. . .. .
cured within the period ef thirty 00)days from the deco of said ' .. . .' . , • . i .. .. . .
. .
. .
. ..... - ,•- .:
• . •
-‘,4°7-"••
,
, , %,- ' ...-.., .. ., . .
. .
,..•'-'•'..:.,:,•:..-',:;.-i- ....:In.::-.:^.'4°.,v;..-:?..-c-.•...V-.• 1,
,
• , ,
. .
..,,
.
.
•-• z•.t.,-,
. ,
... - ..
,. , ...
•
. ., - . . • • ,:-.
•
•
- .___„... . .
..
. ,
`' 'r..y : I '
_estlt. the Seller will declare faddters ad riled—of ham agreement. '
s*-w'i.',..
,0,F •�,-_ tad if the Purchaser.after the awing d inch writhes amine.shall pewit
Y : said thirtyday peeled to alapse dams Mime wholly cured soy dfwlt w s.
'1"-`` a desalts specified le said notice. the feller soy elect to Meta=taffet s -
sd canrellatlam s cu f this agreement. d=ma much election Mime aide.all
44.
rt
' +, ,, -a? fg .rights d the Purchaser berwr4r shell ears sod dotterels*sad any permeate , f
}* heretofore mods hereunder by the Purchaser shall be retained by the Seller
` • is hedgehog of hyaenas sustained by reason of such failure. Service ,
+" of all/sands.notices or other papers with respect as meth declaration el
`K'" ' ti forfeiture sad cautellatton may be sods by registered mail at the folio/i ' .,
obit.�`` .0'5„15 madras:
���."• John e. lan.ee. Le. -
326f Bunts he ts Point ad - '
believes.VA 90004 " . .
+,_."L, or at each other address as the Purchaser will indicate is writig to tin - - -
;{ F feller. Or tin feller my elect to brims action r actions on sat latatmdiats I
foverdue irealiv t or payment. or an mypafineat,or immolate.mods bythe _ .. .
. y,, ;
i Seller and repayable by the Purchaser. it belag stipulated that the covet .
. e intermediate pay intermiate installments. to rho t.Mreedists payments or to pay
. y,. .items repayable by tin Purchaser are idepedat of the covemast to make a a -
^7 !dead sad that every such/action is en ectios arieing on matfett for the
' `", a .reeoveny of wary only is if the promise to pay hod been expressed in a
differeat iestremene and that no much action shall noratituts an election
„4... .;„y' .rot to proceed weberwir as to p eubsuaet default. ad es by,elverthe f '"
• , ' M. llar d ass, au on
deflt tie part of the Purchaser shall be cortroed as a I
. ,valuer d soy aubequset default.
`', 14. the provisions of this*greenest
shall be binding epos d -,
'tare to tbs beastit of the parties berets. their soccaseors and maims' .
} . r provided however. that this agrssaut. w say right Preis.shall not he
N+' .,4... ` aelgeed by the Purebeser, whether voluntarily Sr involuntarily.accept
I pon written=rent of the Seller mid upon the totes sad casditioms est • j -
V
"lab. fi ,
�r i i. ,, h N y t ►I. ++fa.
+ yfi f A r �` ( e
ra:' r,}i :ti„r^'%•�.R;(x �". ".".i %w 'K" era h.., ,� . ,.
;°5; .e - �,.`_j.. .y;L .f ,',P':o'S.n :.:!'':'(:'4: "�•ti•tj,-.,,:Y�`a:.'= ;.�rl
g E J. s f d . ,
.,, r. i 1 11 i� tr t
•
Fiiii ..
r k\J rg ini •Fir " $ E
Ir. s.
II I / 111112R lilt
•
, ! . t 11 ; I ti
r ! a tEd
. 5 �
r2Eiii £ g
g I I ,,;,..,::,,:.,,:..,,, ,,,,,,
, a gt�Fpf 8` R B 8 ( If / !
! ii . : i all
It
\ I 1 i i III . bii ! i I 42 I I 1 Q
...42 . 1 11111 i
. .., I ; Ei II 1 . ' - ..-,',
N • d
r '
}
•
•
•
— ir, 1t' ll
Hll
1rg
,'i��3
ItIn
II r. , •
qa a! „-„a �• a% Ii . .
- has �. Ili! 3.
illild • 1 .
e i , 8 a13biai Al •
fC-- .
., c4y>. •. .' . I I%MOOG . . 1 _ - !!! .
•
• rs + +� { 4 x rr
"'I- . t,. if 'Y {!'T.e . Y- ' . 3 e of
sy "=" ,!f'i , •• S �' Y om • h` �.1 +f } t .' —
R
i
•
- -- , .
•
,»' -
.1.2....y....,4„. ,.... , 2 - % - EXHIBIT-A • ..
. . , . ...,..
• _
. . . „
4011 Stun/Way Werth, Seattle, War.
i_;. s.y:"'. ' y f 632-3366 15103
•
s •- _ august S, 1160
a 1� file i0al6 ",
kY
• — Chicago. Milwaukee. St. feel a Pacific RailroadEXHIBIT-A ,, .. .
M "•'4- * poal Description of Survey 3.
Those portions of the southwest quarter and the southeast
a • quarter of Section 13, Township 23 Worth Range 4 nat. W. B.
la Ring County. Washington described as follows: - •1,4
.x ^ ; Beginning at the south quarts corner of said Section 131 ^
'` Yw: Thence W 00.521280 ! along the north south centerline of
'fl?: „ ` said Section 13 a distance of 564.64 feet to the southeast - • ..
corner of Tract 26 of Renton shor.lands Second Supplemental
,.k - • Paps, 1156:
4',;1.,!y', , .' Thence S 72.371520 I along the south boundary of said Tract
26 a distance of 362.60 feet:
aY `. Thence■ 70.54.020 S along said south boundary of Tract 2S ..
�X '-` a distance of 73.20 feet to the east line of the Charles
Y Bsoroell Donation Lead Clain Mo. 411 .
",. • 7 !lance W 01.24,04• I along said east line of the Charles Beane!!
3 •x{ + D�ooatlM C feet lain Ws. 41 a track of the_y of and parallel Ida ths of �oiste241 f feet
bat line
he
. - a existing
Railroad Tra nest cks and the true pooint' Mil sf b aalig:t. foal
Thence westerly along said parallel line on a curve to the
left the center of which bears I 15.22'320 R having a radius ' yti
+•••, of 2. , 10.11 feat an arc diet►,ace of 701.44 feet through ■
central angle of 16012•31• to a point of compound curve; .
' `~ U: -k Thence continuing along said parallel line on a curve to tie
' `,, '4 left the center of which bears 5 31.351110 2 having a radius
of 2580.74 feet an arc distance of 437.40 feet through a `
.'• • ia``
N; r, central angle 03 01.4213f• to a point of reveres curve: + x .
{
ire { . -•' Thence continuing along said parallel line on a carve to the x
Y
4 s' right the center of which bear/W ll•17150•W having a ratline
(**,,,,,,,,,,....__A„. .; of C:�.64 fees an arc distance of 73.3E teat through • central
` '• # '�+� g eagle of o1.40=04• to • point of reverse cures: ►.
.'
• ' Thence continuing along said parallel line on ■ curve to the
.�. ► " left the center of which bears S 31.21146• I having ■radius
of 636.58 feet, an arc distance of 13.64 feet through a central .
. � ,r.';- ". -• angle of'07.55'47• to a point of tangency; -
,, ,i+ s ..' • ` . Thence continuing along said parallel line I 50.34,27• ■a '
.s;::4 "
,
, ve
•
-r. ,• r - . . a,
, ` t
, —
/: ; - .., .. • .- - •
i►s "r
i
y .
t .
`„ .� • ' • Dssdrlptioa Survey 3 ooat'd. - N.
iv. distance of 248.50 fa t to a pint of curve: .
r• ; _.• t Thence continuing along said parallel line on a curve to the
.,: x Y. left the center et which tears S 29025.33• s having a radius of • - t
, y,_ a ii � 696.89 feet as arc distance of 40.09 feet l a central II
t,- c ,, ' I angle of 03$179450 to the south line of the Sur Northers -
;,N ,,t w "y` il Railroad Right of Na]: '
,T;A _)V ''`1 Thence N 43.49909• I along said south line a distance of 173.83 - •
r= puss. feet to a point of curve: .
' r '�+ Thence continuing along said south line Co a curve to the right. r
'-,,, ' rt, the center of which bears S 46•10•Sl• S having a radius of
,.":' " 4030.00 feet, an arc distance of 197.57 foot through a central •
.ti== angle of 02•48'32•-to a point of tempound curet
.9-7. ?:,=',t • Thence continuing along said south line on a curve to the right, .
the center of which bears s 43022'15 Shaving. radiusof ,
1e53.00 foot an arc distant* of 194.75 foot through a central -
�, angle of 0600191e0 to a point.of compound curve:
Thence continuing along said south line on a curve to the right.
the center of which bears.• 37.21901. 2 having a radius of -
.10543.00 foot as arc distant* of 186.51 feet through a central
angle of 01•00949• to a point of compound cure:
Thence continuing along said south line on a curve to the right.
the center of which bears S 36.20'120 S having a radius of
, 1657.00 feet an arc distant* of 193.93 feet through a Central '
• angle of 06.42'200 to a point of compound cove; ,
Thence continuing along said south line on a curve to the right.
i.. .. -. the deter of which bars a 29.37'520 s having a radius of - - .. -
6738.00 feet an arc distance of 197.76 feet through a central
d • angle of 01.40.540 to a point of compound curvet ,
r4' ;,,- Thanes continuing along said mouth line on a curve to the right. _
:- ^: ` the center of which bare a 27.56.580 R having a radium of
1768.00 feet an arc distance of 194.45 fat through a central • r,
•..•-•- angle of 060/86060 to a point of compound curve:
•
. Thence continuing along said south Sine on a curve to the right. '
.4' '; • the cantor of which hear. a 21.3e9520 N having a radius of
AP.. - S603.00 feet an arc distance of 204.54 feet through a central
'-',t—,. ..',, angle of 01• 1.44- to . point of compound curve:
t3 a+ Thence continuingalong said south line em a curve to the right. ' . ,
""` the center of which bears S 20°17'080 S having a radios of
y: ;rot,' 1922.10 fat an arc distance of.178.79 feet through a central - • -
^'`:A. angle of 05•15146 to a point of Compound carve cm the east limo
{ of said Charles Brownell Nation Land Clain No. a: _
� " i.,
t _. . _ . . , .,EXHIBIT m A x
h - h
r +' •
'. Fes, ,
4t" ;",.
I v..1,._...• . _ . . .
. .
•. :•.
,__. ...
. . .
. . , ,
.... ..... ... _ .
3.144 „.„I .4.„...... -,_ . , • ,... • . _
,• , . . . .
.. ..L. _ • : .. ; . . , •:..• • .
. .
......,.......:.,.. ,?tt.,-_-__,•.e., . . _
x . .
., . • • .• • ,
0sseriptisa survey 2 coated.
:+ 3
- • Thanes continuing along said south line on •curve to the right.
�, .,, - the center of which bears 6 14.57122• i having •radius of •*° s.'., ,
2014.f2 feet as arc di•temoa of LSl.s2 feet through a central
' ` '- angle of 13625•19• to a point of compound curve: ,
;#.'a Thence continuing along said south line en a curve to the right.
t,;f , the center of which bears i 01.32103. R having a radius of — .
• 1165.09 lest en arc distance of 1097.05 feet through a central
•agl•of 52•57.00• to•poise of tangency; ,
Thence continuing along said south line 6 17.25101• i a distance - y ,
of 300.70 feet to• point of curvet '
sip ' Thence continuing along said south line on a curve to the left.
the canter of which bears a 52•24'57• I having a radius of
;j • • 1005.37 feet en arc distance of 45.82 feet through a central
angle of 02.36.41• to• line 35 feet southerly of and parallel
with the centerline of the existing most southerly track of the
Chicago. Milwaukee. it. Paul i Pacific Railroad Trace; .. -
" Thence westerly along said parallel line I 40.11•44• ■ a distance
r`..' • of 126.24 feet to a point of curve;
- Thence continuing along said parallel line on a curve to the left,
.'•'. the center of which bars i 49.48616• V having • radius of
1029.70 feet an arc distance of 309.67 feet through ■ central
4 - ¢... •`.r angle of 0!•4l'4$•=
' ^. { Thence I 49.51.22• V along said parallel line a distance of
.F AL y :ti 167.07 feet to a point of curve;
Thence continuing along said parallel lino on a curve to the
left, the center of which bears 6 40006928. V having a radium of r '
"" '' ` 1102.46 feet en arc distance of 007.11 feet through a central
r . +.,,, A`a angle of si•f6•46• to • point of compound curve; `
T { Thence continuant;along said parallel line on a curve to the left, , '
the center of which bears i 01.50•10• i having a radius of s
•1• - j 2790.18 feet en arc distance of 659.24 feet through a central -
+k-r angle of 13'12•14• to the true point of beginning.
,r, c ;.".,, . :" The above described property includes all or pbrkions of lots 13. 14, 15. 16 ;
�..� �_ and 1T of Junction Addition to Seattle. according to the plat thereof recorded
4,r Fr7 • to toltae 12 of plats.page 75. in King County, Washington
0,- . . - ,„.,...„ .,..,.... .,," ;_..
..4,t_.A...-1,1.___, _ . . . .. EXHICIT-A ,,, . .....,
Ilia k, .-4' 1 -
•
IT .. .
. . . . ....
_ .. : _
1
. .„., ,..,
, . ,,. , , . .
_, a
...-A.," •• --....„ -... 1 i t
• ^'}• 1
FM.kU for f�c:a�d at ic;�uoct of
ion■av ms.�o i a..c -
I
• • en 1ctu at u.•s11M
' LUMLrwa
, s3 y "
r rt•
as
•
•
{{r! cb • ✓ .�a
• REAL ESTATE CONTRACT -TV ,� _ �+
.sear �y s r
:11.a �. - L' - 44t,
- 1- /If er-IFINe ' - :�','
a a Tno - Btu ...-, Apr11. 1980 h--- a.►w v sue. •
•
. kw... JOM1 R. HANSEN, INC., a Washt r. .,r r� "• t
• •
,' nlgtal corporation C rla�IlLY- _, , ..
rr...el„called 1r-weer'..d RONALD'6. NEUBAUER an undivided 33-1/3%interest; DELTON J. BONDS ;..
an undivided 33-1/3i interest* KENNETii L. THOMPSONN and MERTON COHEN. •
s an undivided 33-1/3% interest ALL D/B/A JAG-RENTON ASSOCIATES, a general partnership
' /� !
km sun. .ar:d the-paren..r: A
{TIT'.I.'•ITII That the.:Lr.arm.o wu to lr p.r•t.v,sod It.Penh..,dorm to pith..Iron de sun r lb*1.11..ue # ;, I ,-,
deseN.1 Ira!ratr.nth the aiy,r..ae n,m ,King Couve,:late of Washm,.er
• - AS PER ATTACHMENT HERETO AND BY THIS REFERENCE IS WOE A PART HEREOF: "EXHIBIT •A' AND"B'
,:v ..
w. SUBJECT TO AND TOGETHER WITH EASEMENTS. RESTRICTIONS AND RESERVATIONS AND CONDITIONS AS , • '
RECORDED UNDER AUDITOR'S FILE NO. 8002220257, (Exhibit "C" hereto attached) OF REAL ESTATE
4#' CONTRACT DATED FEBRUARY 12, 1980, BETWEEN RICHARD B. OGILVIE. not as an individual but •,"•--
n. solely as Trustee of the property of Chicago, Milwaukee, St. Paul and Pacific Railroad -
•
Conipany, Debtor. 'Seller', and JOHN R. HANSEN, INC., a Washington corporation, "Purchaser'.
}` which conditions and covenants, as enumerated in EXHIBIT •C", purchaser agrees to assume
Mf . I and perform according to their terms.
• 3;i -
t'. To,ranu and roe hens.m the••a , .•.. U.K.... nr r.-.s..pncr a ONE MILLION AND 00/100 ----------' •
• .�` J
.' _ --------
-_ _�' _---- •+1,000 000•00 I mum.m obit: •
a'} TWO HUNDRED THOUSAND AND 00/100 tt 200.000.00 )nunso.hat, •
:,r'3, leen laid,the rr.efpl.b ...t is brn!.y.,hr...•. -d.and the haLmr of said yanha r Aire ohm be paid a.follows. 'r+
h_, ++FORTY THOUSAND AND 00/100 ------------(f40,000.00) Dollars,or more, at purchasers ."y •
4 i option, on or before the 12th day of August, 1980 and FORTY THOUSAND AND 00/100
:i ($40,000.00) Dollar. or more. at purchasers option, on or before the 12th day of February w e•,,,
1181 and FORTY THOUSAND AND 00/100--------($40,000.00) Dollars. or more,at purchasers `•`t ;,^ 'i
j •, option, on or before the 12th day of each August and February,until the balance of said
... •
purchase price shall hate been fully paid. The purchaser further agrees to pay interest on .,,y i'
the balance of said purchase price.at the rate of ten (10%) percent per annum from the +r`,.
ti ,k 12th day of February, 1980. Above payments are interest only. LA"
•
•
SELLER AGREES TO DEED RELEASE subject property by existing contiguous tax lots 4 '"":a'
* based on .65 per sq. ft., applied to principal over and above the normal contract ° , ,
• •• payment. EXCEPT for Tax Lot 81; 182305-9081-01. 722950-0250-06 and 722950-0260-04. • '1, >f
•, THIS CONTRACT DUE AND PAYABLE IN FULL FIVE (5) YEARS FROM THE DATE OF CLOSING.
"
• ` , a,rrnrrd to m the contract- date I a.a.,.r February 12. 1760 J, ii
S+7 11•The Irn1. r aaumr.and a'n o pm bet or drhn;Irn...I•a r,and a..r.trent.that may as between motor and metre • r L` 1
hernitrr home•ben on ward eel r•.Ir.1 and al I.:e Irrn.ad t .antra the mar burr has•s.umrd pa.mml of an martian. 3..[ 11
r ' s contract or other tenumran.r..r ha..a..n.1 ia.mrc ..Iu r acme I' ;.rotas.u•.n:to.an.lawn or aan•ernts now a ben on Yid 11�ya 11
rat emir•the larerwer' '. 1••l..:L.•.n r 1r I.n 1.'s.•n.... ,Y'', I
1:.Tr pun1.1l an'..•air•..it-h•r,..a+pan•...lull.1.:!. 1•rl••hr bui•hna.n..*and hereafter placed on,door oral estate ,.. 1 r
,A — inured, the actual tub.'.aloe Ober e_.n,I.,..r :..+.ac.I.1.'n wind...r, n•"mina's.acceptable Is the sellersad for e,•� r I
the rakes bevel.a•has cairn.,n . app...and t.la.an t.... -.••roar•.r and I. &herr ale policies and r reds:Osumi to
the.1kr /
'ei • II:The earths. ••hat 1I11 n ..I...n ad•..I r at s•'••. .•tr...nenbre 1hr seller nor his amens,hall he held ,
4. 1 n+wetav ch. n,;.e.n .an:e,..n -',r. rat.ha.er n rller orthe auens of n,brr le brief to ' :�j
n I ..um par aeror,vnt I..t antra.:••1:^Orr•.•...n' Pt...r�,.e, r. ...rani us armament r,Lrd on a contained hrrein or n `_
.n :a+l.•I..I.rd la a,,.Ima.h•. - •t tb.....n:r-• on
her^.n
.a• 1....1,',.•!....•.:e.•a 1 L.,.• •1.tars;.I• - w•:-'. •...rtall oral rate or hereafter pia,d
o t•e ! •:I.. .^I_ ..h.Lou..da,ru.l..n..r falser.Hall - 1
�'* ...r:.:,e..'.::.....• ..•...• n 1:. .n�1 •I ,he. n..d of ran the
p award
,r�,•;. •' 'I . lq.M•1 a.11:.mrnln Ibe pueblo. • .•;a
aYi' 1•r . -. • • ..r .......her n•r and In rah.nl.r.rh,r .loco
t •1.. nose.•', n�.aea t 1he mF.l•urn r�* •;,
1 ..1 I •he sell.•for aN+s drain.n 1W
• •. •• :whey al Idle l c
•I -... r . ••.sat n.. .e...t..•..p.ne.re .1n. •a.!w.n a.1 e
•, d• 1
.. ••1...'1., sal. w a.., to.-l.,•• .,n I c ..•r menu• y
.`)}.4" 1.1 r n.r� .~ an•1 • sear.:. . shah the .Iona s• (I
r •
. \-... ...r 41 or aut..•.a .1..rfa..,..•. r•mu sant m. a nn ennui.or other obi..,,., shah 9�.1-<
• .f I t •Sd W twat binU m..I.r -.tk
s
-2 k. .
+. , ,-.to,
id V*
r r
: i :',.i Y �i rz'r .h' ,� .- } 3 C • + +A t '
, . - - •, s
. a qi-
/
l
•
•
•
•
•
•
>z t*;
•ale .�'
�.- iv If seder's tale to and teal c.d.N solved �r sR
! or an.m,.nnee.a . m nnlras.e.rM coning,.under.h'an vela .n.k halt add teal late, r
Ghee a.ha ha.the rite.1.ken t paler saner,I..ale.ink mote thnt.e
Y taah.awl link the Man Ihe made
sad -;-..
w`� , I real d•wit,the pan►arr sash lean the Mt to make r l rycomm. evry to emote Ibe boon.and u•I.I .I..w.1•r.ode "
s•. le alYied It,Ihe pet meat•nett fahme due the wake mike tuns contra co"a
,.{io, I. Tlo rare aerie..up.mewing lab payment I the purchase price and inbreed Y the mature abort ..Itrd.I.me me and y ,•
a.N dabs.,•,.punka..a atubr...r.aoty fulfillment .Led to said nal.-.ate..,.tan:a.,l.a,.1heorof hereafter « +
- taken tor'Ode use Inn mil rnrumbran.n.aline Bar that may attach alto d.r eel rl,.-Inc though any per..,.wk.,I.,.14 lam.red
a 3a
• i wLpat to the lolb.alr
,17,,I,.....
..... _.s.
f ., • •
p t;,, t i ALL EASEMENTS. RESTRICTIONS MO RESERVATIONS OF RECORD. IF ANT. 4 `y.: t
f'a f e
1- °° (at L'olep a diffe vet date is posidel for herein,the parcharr.hall be entitled to possession of sad real .Ian dale of closing f�a
• 5 . and to retain poa roes no lone as ryrcharr b not in&lain•hereunder The purchaser cotenant.to keep thy bwldme.and other Improve- M t
j`. I meal.or. id real Nate m nod re., me not In imam,.1,and not to use.or permit the toe of.the real rUate for y Octal
pawnor.The punhwr cotenants In pat all date t dome'Ion err ennirunr•m charms for water,nosey.rMralle,suture or aber utility ' X
.7 amen furnished to said teal Nate alter Inc dale pun has.is entitled to(.s.esnlon, •'4'n
•
�"fF_•`a ..) I.,In car the purchaserfail.Io make am punned hinny peptide.]or t..maintain insurance.a.herein required,the seller may make t 'Of
_ft
e ,,Q well busmen•or attest with insurance•and any amount.m paid Lc the teller.In_•rther.doh interest al the rate 01 1^^•In tumult]thereon y
""'nn31 from date.f payment until moat.shah be reparable by purchaser co•a lle o demand,I.all without preju,L.e In an der riebl Ib.Meer ,t• t 1
d'Lk might base by reason of web drlank. d
t a e lint Ttrne to of the mste tool tbu eontran,and m u soloed that n ear ter puth.rr.hall fail Io comply with er preform key =• ;
Inb,e err ointment heml ate to make ant lass m,eel rerwred hymn der pmmptls a the mime anal m the manmr hmie repuirrd.the v.
rdor inn eke:to declare all the plr.ha.rr's rich,Mmm•I.r t.cr.rent.I.and upon I...douse so.all rytmoN•made by the rynha en yf;: I-
w I,.rrun.l.r and all improtemmt•{panne ul••n tl,. al..tat. 41.1:I. L•nonr.l to.Ihr w lbw a-liquidated daman• aril the elk.shall .'St..
a' `` ' hate n;ht to re-enter and tale p.••no m of•he nal e..a,r.and no sensor I,.Ihr'ellr of ant do.in on the pan ere for punka er shall fro A...
.ly eonirned a•a•,o ter of any wloryuml default
„ I ••n Firma purehaar an all tkmand• 1.ell.or other Pala...alb n i.•t to,1...I.aver and t b.c ion of punharr i rirht.man be F
•
node In United Stale,Mail.pouare me-pail.Mum n,.e•I reeve i.1.dun•.,1 In the telnb..r at h•s ad in..tar Inoue to the M'4r N f
�waa I It I Upon.elkri election to Deane win to ml•err ane ruminant of the.•e,noon t.on.lvdm_.an to rol4.l an.ry.mrnt ngwred x+ Re
tL #-• ` M n, r.the lei purchaser
an aetee.to pet-a iodate m 1u„met'.ton am!all.•..t.and eapn.o•m tonmmunn.nit suds suit.which r `r••re
any jadereenl n..rare entered in such rue +•."t
' wino I We seller dull Win,;soil to procure Jluduabrm of thy tcrounaio.n.,I thy puaharri ra:h4 h.reandar,and iudemenl' •
F entered the p••.hare acres to pat a reasonable sum a• porn,.\fe,and all n-t.an,.pent in meson.nit inch our.and also !.-
":T` / the reanrable coy of.ea,ntooe rrroeds 1n tlnemdn•the condition of tale at the date such was isomrmvml.which sums shall be '>i
� included an mdement or deem entered in...kb Wit ."a%
—) IN WITNESS WM:RIOT.the runs hereto lase everuted then m:^moot a.•I Its date Let•r,ten alane to -
•
P /! IW •
t JOHN R. HSEN. INC.
y Ronald b � I'rat ter
'sY`• • All
Kenneth L. arnrta.� :1 r
Thmptm tr
•
„e a r 1- .T.\T}'n1 \c\.III'trTatO ' Merton Cohen a
',natty al King i ..-•`;
Ca •'�' rd I On this j] .1,, e0.r...g; .prrwrull-y appeared vet 'April Ise cared l �4
•
John R. Hansen made
t to me known to be the Hr.,Lint goal Ittaaallal rryreainah••of
it •
t. the corporation Ihal r•saauled the 1,:...•,I•, i i. .ter I I• .I.1:.t1.n•I w•nunnel 1.•1.the Inre and aduntan * nX`
e * Mt and Bredof Saki the atin Des .use,.restpu Vot
e,'nvolesuo•I:oat.m,. er oh stat •tlan he is ^c'a,.,;.."
,,k•-; authnrind to raceme the tail'in•numrnl and Ida,,Ihr ae.d nfi.u-0 i•the ur(erale.e.tl of>lid corporation. ,--,.. Ya^a�:•
�, `1 a 1 I In With,.Whereof I have to feud'.set ins h.nut he day and ors,Arts.ante written. ..0n 1.toil.floret nay tJ(.Pal•.J 1 - y
^�!G'
� •
7*T', Note,r.h�ea mud jo•a,?mite of II'at4i.gtn., .`h»a .
a .F ri,hrt lollttvus ati`
�r, •
frgPIONEER NATIONAL +•:•. • ;"
.n ^ TITLE INSURANCE •
S •A•; •MOII COMPANY �'+.'r• `
st•a. Flied for Rr ttrd a Request of • '``c'S•
a � _ L;
,,"` Ile Uri .l 1.4 sa iw r$i
•44 r,'"1
•
TO r y S -
geA IglkL eLl6'r� 4,,a
, h' Filial./ ii
... a i
c p «!r' t • -- — sTy h
w•
4 u '• -
•
ah. sp..,.. ••
- ' Ys i e4a i - t - _r _ - e- . .+ .- T. r Yl.r^
�
xa � k ' 1 eaw • ; t , T t iSe '
� { W'- .- ''fr. r-,:. ,- .s
•
•
•
xJti
TY x. r.A, r 'S, `
4.Y'`..o
r 11.111,4.1 -
•-:arse, xi.vluccc, St. r_ 8 :aai.ic--+•road i.,�._" - _ ...scr c= =-r,-_r« To :la Sold. ,.$ ' 1i �.:_t to Lion of he .:.7•rtheast csar`�.:.- ..4 he coi.t..woot i 1
r + ; i in r c for of Scotian 13, Township 23 North Rance 4 mast, :.
i I -, cl ... :.a pztic c. t::a sett:.vest •c..:_:.c: of Scc'cia.
4 Q 1E, Township 23 Worth, ,Ta:.sc f East, W. X. all in Yizt '4'
. '1'', ', ` C Co...ty„ as._«sto.: descri..ad as follows: E,
x I
_ 3' * t ' r ' lr :egi_.iaq at the ee"th :�.crter corner of said Sectio:. .3; ` • _ 3' a",'Ss' . I co _ -- i450.2Z• - - _ -South ccate.li:: o i `.
iY0,PA •J :._idsSection 13 . distance a-�Z34.84-fact to the southeast y
x• corner o•' _..c_ 25 o: Reato:. S ore`a.ds Second Scyrlo=......._ 3
rr s 1 bNaps,r1953, and '.he true point oflecin:i:.y;
'I i S 72°37.52. :'I c_ -- '.::a south hoc::.da-y of said - i
a .3 a :Y...c:.ca of 332.33 feet; _ , '^ , ►.
a.ec 7J'S4'J2• k a long* the scut:: =.c�.d rf of said ttcce 9 ,Jvh
`,2. ' 26 a distance of 73.51� to the ecEt .ice of the Chu=1cc $e
•
-Cr ..=o.:.�__ Zona_ion —.d C.a..=No. C''•
1°24.04" = along id oast lino a dis':ance of :6
., . } feet
Thence N
. r: •r S50.58 feet to ` lice 35 "southerly of and parallel " + ri
t tYto �
nz
wi h the ce:terlino of the -.. cti:y -most :ou'therly tc _ ~� i
��. ._ o_fthe Chicago, Xi_waukee, St. Paul d Pacific Railro cd 4 '- ' f,
t..". rL f L 5' :"recce along said lino 35 feet soft arty a1 Lod parallol
1 ',.'
•4 ; w.,.h C:..:: centerline of the nest sou_.xAv track,_ •olonc -
curve to isht, the r canter of which hears S 5°22.32" a
, . ' :.vi:.- a radiusof 2,790.19feet, :.c arc distzcco of 659.24
•
- through
control aa6.eof .3°32..4• tam.. point of <
,.,- �;•Pet,
i + cj Thence C:GCC a curvo to the riche, aio.-.G said per-"-' 1i:.o, ,
.s., the ec: of'which hec . S J:°SO'IE• F. :cvics c rc.. of
45w l ' ,102.45 feet; a arc distance of 807.11 foot through a
c•<'^� central ccsle�of 41°55,460; } :
. E Thane*: S 49°55'32" E, c_c:z said parallel lino, .. dist anco r
'lW , ./ )x of^157.07 fee-.; h►.
:w rog�1 •
41
::eau:. —=ens ce.-vc a t o ' r_
-ci parallel lite
w A� �t ;,r764"2.;•
• 'a. . y •
. , „,,-,. :„,.....:7,.
' ` G •- . 1.. to .ice.
•
{4',t 51,.E � \.
L 11
ACC •
{��l/.]J� �- - .'•
,
• ,....N f
';-..„,m,--,,,-41„ -t. . 1, x /
j •«.K ,,, . . �
.4--'•1N,,�, �, x .. �. - - - _ .l r, " �, �t
•
, ; • • 1 ` '
.....,r d._cr_,r.or'cc•.r• . ?aqa 2;,."-'''.,',4.g - • ri411... .
tf
•__v_:x a radiv.s o_• '_ L25.73 .act, az •=a di taaca 02 100.07
t 1, .I . ..rough - can—.al rac,:a o: C.S°4:•4a';
4* ,Q'µ ' / i ! _':: C t _ :v_..y _::s: lino, S CG�1'44• E C. d:.^t::Co �,
.7 „ a c•_'s5._ o: c c a oo:::: :Una of t:o ..urii»g:oa - _
'r _honco a_ -- a LL:GVO 'O ::..: l..a, along; .. d LOt_a lino, t'h3
-• .pie' * G , - cf _._e: rar: 4:°.3.15' ' :cvag a rcdi_: of
-,....,5. 7 a:c LL3_.-.CO C. 549..4 _u3t .•::ro••:g:.
:= _ _ a:.glo�of•31°17.19" to '- tangcat on :._E" a:'
: err.1 Liao of r... . __iaLr... ..a_a load 3igr'.rctWay;
•
' ? • Loutho y",I * m . ___ ; . 5; = aa 1 with ta ox:c i-5• f•
r RE-` ] I• Louthboundtrack, adistaaca of 225.53 coat to the woat ._a.. ,. �-�
Of said :cation _2; O
yy9 € G 4
X 6. :. - Co:` :cia, ..:.g L idr..oct lino 71°2Se03r - c•"•'
'� _ c _or :art:+ o SSG „4•1
+ +: f ^o`r he aouthwaat quarto: of tho LOL•t w30t C•ri._rtor o2 °- ;
o~ ▪ J LS°:.0•: - a.a-- r.:. north line 02 •::.a Lout: 653 ,
- ..
«7`<•.4i`" ......... _3•r• _ ...... _cot t0 ..... ..r..r r_..r ..r _....
s't ;; i, j • ....__:x_Lr qual-tor o_ cc_::r......t_ca _ ,
':' .,...:er 2 i °: :,. 2 along _:a :o=t:: lino of roe ae= .5:.
▪ _ 3: t::a .:aa - - a. sa_d aoa`13 - distal..o
7', a▪- _...S: ;..rr to a.• "t - 't;v �`
• . �,r ' : i, • j a 27'2_ 12 _ .S Laid o-rt.. boundary a distazca ;.
( "'"O' . v_ 157.•i2 .. .t•TOr... gla SOS ;y ~' �•^
• *? "-''Yq; • t 1 c3 2 03°17.25° - o:c ..aidr:out: botadsry a dist:.»ca `` '.
f r:71.17 Zact;
s.`__Z__ii,y y:.3.c, S 43°22.22' 2 along aid Lont: bou dary a diataac3 '
.'... �' 11C L•.:a:03 S 72°17•02• _c:- acid zcu_:: oou:.c.a-y a Gia`ra:..:.. w _ ' a •
'�y r'• `��• o 72.33 foot to tya t.ruo polarr;Of ragiOIIing. L'.
.f z,- '';, 4/.,.Z1.•# . ::.d t21-: .
. S . ,t, -
•Jr" �'.' y /&I ..... LS} "' fi `.� _ • ,
r
•
-: / .. - _ - o: :ve 'c ttc= o Scct_'oa 13 _:.d the
41so k son_.`,c _ co=rter of Scc` ca`_3 z11 it Torsaip 23 North ,
::;c`•:�-...t, U. X. - <i:.c Cct::.ty, �"r.::.i:ctoa Goad I:.G..:. 1.
follows: •
4' ; I,
i x. t•-- :i - el ::ing -t Cho ac::ta cr•'t•r. co».:: o. said Sod:_'a-. 13; f ` :I.
"• t a`� . .' :•- . u:.�'So'20• 2 c:o:.y «a :o:tc.-:.o_: coatarlisa o: • t ! f f i
. ,,ti_:.:. 2. C - - _27 3 �JJt to 23J sJta:AGst .. '_ '
1` N • i4`.'.Je cia.omoa o= 13_7.3 r�
jt hh o_ vov-•-_cnr .... 7 of _ i` SJ:moo. 13; ,'I t
�; I� Thence 2 :,7°io•53" -:o.-.' sot:e~._i._o o. .id Govo_:.a.-_t , ± I1 IR
" y -1 ` • .at.7 - :::c_:.:;J o•'42S-25 Jot to t:t ::::t lino o: :`.a ,L 4• 10. 1
n - c::w_oa wo-^c1- .7onCtioa c-a_..::c. 4:;•j +"� tit •
*i ¢• , .-,,foot .- . __:.- - - -t•- _ _�.a `lle_ ,rt";.
. with
ant
'e' +s r . w C:._r:..=c, ::Live e, St.r=Q� :=L 2oci_ic 3ti:_ot4 , x �i
r= .._..:. _:•.: - - -1 j J: - Boa Lo::.:.e_:y trac C, - "_' .. 4 •1:
r.4,t Jr4 1. ▪•-y_ _ - - 2,7_3cantor- :rc� rc2 ". ° 1 •
py •. p_
9
` ,,, y' _ = I-�Ce..�.._ ....:�_3 G_`_ ems•..s to _.:. G� T = ,at ii
"'F ro,'y{ r 3% :-Q_ .._..._.�:~.. ccr.•.�`"1,;_::a.._`vy''..- :J'•� ; r.�. :
4y -'i}'• • •Lvi - - _a.:_ _ :: -..a3:'37• C or._`sCC.. i .•v., * o
f• y n (ilko. :ter __«.,a:. _ +.y- - oho`....__ '•J Of t:a :L'•l .-.y:C. , Alf
;,r _ ay: _. Y.
qta!
i •
� sp
....* yo
�
af t �
. t
,4 b � >`.i-,+ k ? '4 t .' f 4
•
•
Y -
( I . , i.iit.'..tri...
t
..,‘",::.
• '�h
. -"air'-� 3:�'•
o^e
i 1 c _ =..e-i�tie. e' _.... G3+ sosc . -_, ooi.: cd ' I Yew
i42: ;' • vela
jir
✓t $ :: - _c= ::ac a-_y lar.- acid sout7. rise alonr, a c�.-ve ; I wit'
` tom tha carts- a waic:: : .�^ S 35.24.23. 3 e
f r.v .c _cc: us o ,G S :7 no se dis:::.w o: , I t►�
.wa �1� 252.34 ..2t . rough .. ca:gal ..:.gia•o 14°23.53•; .0 r `I`� ' 7::
re^t�t� ` . L ea 1a '+^ _ It Ss a distcaco ti lo +
• . av::: said scL•i.:: :iao, :t 4C°:1 .4^
a_ 12;.24 .Gat to ,o_-t on ^ liaa 35 :cat sottho=ly o-2
1' ccd - vit:: ._c w::e_iiao oc t.e existisq awt , f( .�
•
an:•. O .:a Chicag0. :ilwar co, St. Paul and OD non(
; es::
t`.ya•
1 ? along said`li no 35 .act sc:a:,a=iy f G . C.n kallo_ o d• •‹6..• sv9;
,?c - withth •ccata-1 i-a c_ . e most sont::a--y •:=ac.:, along - j'r� J=• ►)
�_, curve. to.-::o la- having radius o 1,:29.7. foot, • M t pun
r aa:. arc dist.Inca b7 coot th-o zh cant-ai saslo o .! we
a 4:':3 32• W. along said parallel Zinn, • dicta.ea
Lt.,
•
f
'z CO"'
� ' '
. a�t' ' id
having _. 0 1,1G_.•.J Zaot, O_ `wca O_ S.7._
M; R y ,
• PR. . _ a ._a. c y1 o= 41�d 45^ tc �i:t o= a9 r.
cos- : curvo; • - ',�`'" the
. 'AN• hcaca _r C-�=v:: to tha ln_t, lcag said .....,.l a._ ,_a+ l r !Ws..�W' having - _ oc 2.75J__: oatr - di •t o.3 a t 1 .24 - -, ,
_ '°32•:4• to Can= ii:e ens
+ -'Ip': ssG a,_°14•34' .: ala:: id ease __no dist:.:.aa cl , ( � 11 suc
.)?°.''IS 47.0 _..a. to tha .-::a ,point c. ?.aci===-•i.•� -6. I ! exe
t {aQ':; 1. act..
!
�J r S r•'
..... 1 1' peg
, .... ..,,, ', ',AA,
i t by
"f r$ K 11!
"?* t ;' � out
a .. • f?`.� the
sec' :<
ar' ? j cos
a 1'ia" w11
try • :. A, t .F. rl-* ant
`4' • , I `/fir '..
•.�' L •.
•
•
aasaaa♦.i
' :x,.,g.r 'C X
t • < 4
Seller will retain an assignable easement for a strip of right of way conta'ning 1'
3.06 acres within subject real estate to be used for railroad purposes as described on • in�,.';i um 1,Exhibit 3 of that certain real estate contract dated February IL1980. bebeeen • S ,
Jr -, lr R:C='aR:3. OGILVIE. not as an individual but solely as Trustee of the pveoerty o'
I
?iCAGO. MILWI:'CEE. ST, PALL MO PACIFIC RAILROAD COMPANY. Debtor. 'Seller'. and i
e, t I ...0W R. HAWSER. INC., a Washington corporation. 'Purchaser'. Purchaser ray construct b. x a'. �+ •
'••; b
?� one or rs>re industry tracks across said easement to serve adjoining lane, If Seller or s, e a
:. I it's assigns gives notice in writing of its intention to use said easement wit^in two 1
n
4 • :� I , years iron the date of this contract. Seller or its assigns will pay the then fair'market • ' -a
, •i I in
il
value for the land described in said Exhibit B. This right for purchase of an easement }
will expire if not exercised within two years from the date of this contract. ' ' `;
C I - ,� H
i'i Prior to fulf111rent of.this contract Seller will grant to Purchaser a permanent, i i ''i t n
1 •& no/exclusive roadway easement with a maximum width of 60 feet at a mutually agreeable , •i I? ' .n
;; \' rii location for ingress and egress from subject real estate to Monster Road. ;� `,j ` .
Upon fulfillment of this contract Seller will reserve a 60 foot wide, per'marer:. . . ';� - _
+ i" i co nonexclusive easement at a mutually agreeable location. over and across subject real j4 ;+
L*:x?s, }I. ,
" estate to provide ingress and egress from Seller's remaining property to the Y.est c` i`— : t
° �. subject real estate to the nearest public street lying Southerly of subject real estate. . U. s': i
a J.a
as Purchaser hereby agrees that when it improves the street to City standards, purchaser a' 1
cry:
: - s will dedicate said easement to the public for street purposes. ••
,'`: °'t, Purchaser agrees to pay the entire cost of any industry spur track '.t may wish :o i •/ i:-� •
I II
= i1•�jS construct frog the existing Chicago. Milwaukee, St. Paul &Pacific Railroad _ompany tract • n/� •
',.
• 'ileai le; adjacent to the Northerlyside of subject real estate. Purchaser also agrees to enter •.t.!,
�,-, {i::a'i. into the Milwaukee Railroad's standard form of construction. maintenance and operation
ti agreement providing for the construction and future maintenance of such spur track at ' N
I
a the expense of the Purchaser. r,. N, e
• F' .. "'a Upon fulfillment of this contract, Seller will reserve a 10 foot wide permanent i " l
A 'af�►,:,Ji
easement for use. maintenance and renewal, with right of access. of Seller's communication ;;'a. ® • +
.`' line as it now exists across subject real estate. If at sore future date. Purchaser, his it
it
1` •+ successors or assigns, desires to relocate said co-runicatlon line, he will do so at his . f: I .`
y' •' expense and if said comnnmicetion line is relocated on subject real estate, instead of o" "S"`; tI' :"'
,;.--of. .D. adjoining railroad right of way. then Purchaser, his successors or assigns, will grant a • .. X,c
.a.; lL �f
permanent 10 foot wide easement for the new location. = x% '
: '. ' S w
'� t
`,I• Purchaser agrees to protect drainage across subject real estate in a ranner approved • a t
• ) ,
J !i f)••f, by the City of Renton and acceptable to the Seller's Division Engineer. �,,,� ._ 1J'"e yl4 . •
;-
s r, Purchaser shall and will protect the subject real estate frm and against any and all * } :
tr �,,i.7r ;-;A liens and claims of lien whatsoever arising from or growing out of anything done or °.^. 'x ' M
• authorized to be done by the Purchaser. and shall and will indemnify and save harmless ;„ `a1" •'•, w
• i•• the Seiler and the subject real estate from any and all such liens, claims of lien and __ "7:. ',
a'.' :::r, costs incident thereto. The Purchaser shall and hereby covenants and agrees that Purchaser dz
�;
.,a will release, indemnify and save harmless the Seller from any and all liability. loss, " •
1-.T'fi.- I P
-' damages and elates for damages to or destruction of property;,whCther real or personal, - 1l74<j :•
and •
injuries to any person or persons whomsoever, whether resulting in death Qr otherwise. _
3 attributable to the condition of subject real estate. `.,,%
'• ..$ fit-• :,:.
The Seller shall reserve mineral rights, right of`s�N,ace entry, f•-a_ ,r
if----. arcoacx. wares 1 �1 `' )+�'`l a : .
. ,y' .. nrnrrr.ry n.. ._.. ..... ...,m bY�
r'' .' ..,, d".
,
',y . ~ t- yai ;�7r` r - _ ? maw.. }• 1' %` =`fir< 1
3,-4.,''''
_ .
.-. %., .,.s....,1 V " -..• ),...;-: -,,-,-. ...-,„ATh'* 4, CZ"'":'• fr7'*, ----"---7.--3-.,-...:, , , f .
:..-=1 t -.-- •- .,--- - !....., -
‘tt _'. ..:* , , .,,,,^ " •, ,',.'1, •3•.,-, --. ••),.. -1 ,' ,,4 ..;- • - •
, L.. - • IV 2S3 i ' '''''•-'''' .' ' . '
IN CONSIDERATION W * • • .
. . ,
.• • .
Ono Thousand has Hundred Elghtrelght end 118/1.00"
r . „
• ' ?.. the receipt of which is hereby ockwaxobeeta,the State of!Washington does hereby grant,beryahs,sell
,,..:: , ....
• ,,
end convey lotto —
i 1 •-.
L°: CNICAGOL MILWAUKEE, ST. PAUL and PACIFIC RAILROAD COMPANY. a Wisconsin corporation, its .-...
. ''.
heirs aitol assigns,the followhig deserlbcd tidsuor shore!midi of the pet class,situate Is ftvist of Mb .,
., •,.
•
••`•.::'•v.:-' City of Renton ilt----51111 —Collisty.Weeiblgtomilb--
-.7,• : -
, .- ,,.• , - 1 --------
, . .
— --- ..=-
• ...,„
—"'"-----Tracts 25, 26. 29 and 33. Second Supplemental Maps of Renton Shore Lands, as
Z: 7 *.; .1.41 show, on the official maps thereof on file In the office of the Commissioner of
Public Lands at Olympia. Washington. 4* 4
Subject, however, to an easement for a right of way for a drainage ditch granted t.-I..
• -^',.,,ri..,.,- ' to King Count; Drainage District No. I. August II. 1960, 'under Application No. 25C22.
'IN.4!:•7",•,;il"' Suaject. however, to an easement for a right of way for a storm sewer. granted
,. t.'-`,0 to tht. City cilt Renton on November II, 1962 under Application No. 27581't
. SuJject. however, to an easement for a right.of way for a gas pipeline granted
4,5,;. ,A
ta VashinL,ton Natural Gas Company. November II. 1956 under Apnlication No. 2b,36. -
Su..).icct. however, to an easement for a right of way for a flood control dam,
rate,: ta the City of Renton on Septemuer 13. 1961 under Application No. 2EP55. -
n -..t..,1
--------
__ _________„/
_ •,'
„ .
___------"-• ,
AAA..",V ea.,..., ,,.‘•
..........••••••'..
'34'•r'''*'' .' • • ........ .. '''''
. •,
• 1"..'
^
. • * ..
-, • -
.
--------.----- •
.
• I .."^ .
, - -'-,--The thsee domes&loots ale moth=Meth to ill the porelthres el Chapter m et the feethea Los al 1117.to slake.ntheatere Is ber=
",.., ' ;1••-i, meth.eel elsieh doll be a bratee up=the Mathes owl ety insomosor is kibrat rea omelet et met est all ..
areeer. L.
. ththloet,to=.1.11sr.grultrouidtbilArey este tall lei...othiOTeeb lo...zt zr&ar.14.0. ...j.=.......a.1.v ra.,....weeem•. ...
s rotresterrortagyeeivelthe tot bus than threw.ohr Zaloe 14, I 113111.IttlthltxT thelelethlesty acres thrheettheireVe L.
•c''
losox-opprosed Werth b.SIM Wee camber SI at aC ma.
. t• • -Tho greeter berate,esetheray them.thos4.71 ext el the greet leotery nide.11111::ref,Ito ooroomen mei sweets tenser.al
. , _ elth Ira soot.ereo.missals awl theette el ...y.-F.,....,....„.............,.=:„......r.,. ....br,„4„, ...=
.„,„ .. g..,r . part teemed.end the rl,ithl Pr/spire Mr osse_
outocesore ads aw mpa to ether iloettjt= me •
t , ...rot=est,..1.ol.r,=.,ser.r.........o.n.......• m ..4 -yr perFna.a.teethed. Edens
... f• -. ,, mil West out airt the=.., rs...... -11.31eileneh etth.to=Mot.sa....... ..,e4 sod to .eed tenter expressly seethes
4 :' .".eillt).. is W"bireestnart.Weil us& bre soorthothel7.--nas molaUrbrerelio.=la shaft.eTthaorsi"essTriToot roil , ....,
le remota ea satA ts,.1......thior ory port ........ ..... a •emi 1....=%c zafrie wm 1..dis=jaw be zeroa.642:1:
orrthels"ris11--- la""rtre.athress-Till—PEW"thisother—r.r=,..-- .-.... err esthesteat to molts bon:
o,•":Lr.r..-^'- ,,,,` „ &ad me offisters the esth.Mho eateysthett erg pathcarestiZhe =es=itzuertha6. ....z.e...tinehatt be zonther.
- .1•,,.,4,-' ^....".: the osrel et the Mod Wthses to=LItieW.7=1:reservell is illorrtertio estesthero it scythe or meets to be esrentherL toe perottha
, " ,•-^*"...* "Li , tar oil stsetheth ulral by oath other.by rows is eolertht W..ad his.
....." ',' -: • ',. ''.''•L.- . • 1 •- •
.
TO HAVE AND To HOLD the add premises,with their apportetwaces,onto the azid
•')-_ r:•t•-'• MC I CAGO. MILWAUKEE. ST. PAUL•And PACIFIC ,
-1
- .. ••ft.,-• .. RAILROAD COMPANY. a Wisconsin co-rporaticin. its i
_Sas and assigns forever. -.• •
• -,..;..,. .
04,,•••••••-•‘."., ., . '' I -t i '-,- •-' 'I•!' ' ' • • - '
r :
r, „!.....„,.,-. . 't ,', •' t • ' WITNESS the Seal of the State,affixed this
.
_.,--A:",f4 t ) ' c, -•• ':'",„,E.;''.4.,..- 1 .,...''.,i A, - -? f . - '.:. •
.•
•40•-- • 1
1 • 7'....:.: .12.-..te_s____. ___2_—__ .i9 /..4 - ''''':.•
•
, - L., . ,‘ •• ••.•---f.:-.'"°V !
f4'•,V 4'• • •,-.i.,•••••-.4',. 4. „ , „ r i . i
i a,F"-* = 9.t ,,..•*.,,- ..t'1.-','NA. . -I ,.-
r a142:11:, , .! - L
.A....
.11 A 1 'T.'S.*' ..'C.‘i --:.." *
' t
Clasersev, . .
-1'"' ' ' •
:•••• ,,..,71.• -.' , . i • •. ,
0;•,. .1-' •1:- • 0\... - , ••• -; ..a, 7 :.•., --.:;.•.•• * '::'-'-'
7:*.f.: ..0,4'..",,:-.'.1.•••• • e,.... i fr-40.,.., A.•. "•• ::':-_,,,-..`....• -....• _, •
• 'NC 'I ."'".4.. .(...(1i.- .V.e.--.,--;;r• I., 4
'10• ' - • ' '-.,"s•-' ' 1 - ..- 6 '4289• - --1-4.41--.---.7,:-•;,-.:,,...., ri-r ,,,, ....-„,! .--‘2.,!- 1. : ..--,2, ,•:-),:, .. ,, , ,
„L.
as.,ar. 2165 ,,....... .. ____7.1k,....iitiiti,,2- .4-,c, 714.,.i ...1.4„, .•Irierds. v-atine43::.-il•.3 , -nipaies...,
• • r; • -. -,-',_-. tr-, ,,,,,:-, ._., ,
. .
4.4- ,, 4,„„, -s•4 . Cad.XL rad isr lamp .e..".71 f IP tor ,egh AIL i,- , ,, 4 . V•ttZ ,t+. ,,.,:,, r .,,:,:-:".":0‘.1;.,:,?1,1•V ' fr,,,,,L„'' ",-*::•,, '..,:-, '
-.a..•.0. .•,-:_...... t''I .----,'"1.4•4,e, '1,1-'1' .•••••• . •f-‘•••-‘,Jet-I .•. . ,..'",•.,4,..: ',,-,„,
imam d fop 7.." os...,----, , • - frei- ..4.a.,,,, Y-0--- • , 4 " L•rA ...4,...„=.4%; -^. • ,, .
^•,^ - *, LLILL, 1 • &Ls&ai ' &MUT A.1ACII1!S.Gary Awiaw
''' ?.4 .. '.... # 1 • ...'."...0''.'.Z.4 C.V1...r.stit4j: c7j.2.A.}.. .:.411:-Ii. r.i:S.;t.',.:r:Si4atill iiA 4LceZjre).10;41:4,..4 ..,..”'''''
I
1.
/ ' ' -
. .
. . .
f'
. ,1.1.1.WIt
../
./,--•-t''‘. 1 . . -. •' 1_'''',..---411P4,.,
-, - ?..., , .z ," • "' ' ' -. j,,,,,Ii2.,,f :%,.;',.,f • . '' 1
• -1
....1-',„,•')-54,;'/L,1-1 '''',,k`!.."'i. ,..-; -4-,!-;.,-,'" s')- ..• -4.- ., ..• ' 2-i..:,,,z7.7f-t.:2-, ,..,41,s-v,..-Fi-,p_It.4,11,F.--.-.?;,_2,cie,, . •- •,-,,i..-7•72,,,,,,ic.,4•4',., ].....::.,-..4. .i.,,,..i _ 1
„i:itiI4.4 :,..c...7.raik:k..:-... -...-,..-: •-• i- . - - - ...- ,,,,'...., -,1:..f---,- -. ‘-',,:' -‘;1 :,.,...•-- , •,.
, =-:'-;• . -'• - •
•
I'ft I 46 .
.A.41-,0;:.',' • .
. a • . I e.•,.
S.
. 471F ' •
....... - ' REAL!STATE CONTRACT I;. •
, .,....-1.".. .c't......?".'
..-...
741A4 1,•si,
THIS CONTRACT. mode and entered into thia/Fr day of/6-44f4elf. .
4':''S+1 -AZ,
.t.T. -, . sc.s..„..-k•
NA,
1964" between RICHARD N. OGILVIE, not as en individual but eolely as
4 .f-A-N
V,. Yr....4,1
Trustee of the property of CHICACO. NIIMAIDDLE. ST. PAUL AND PACIFIC PAUDOAD
...._
COWART, Debtor. being in possession of all the assets and property of said 4; 475'0 44.-41 L-3 7: ''._1"', 4:4-*e..t1-511:ti
,
VILL • t.'4,,,?..1,.4 44 01
44,1,1 ''
Railroad Coupany under authority of the United States District Court for , •.e/", -,-,,-, 65' '74
Ccli the Northern District of Illinois, Eastern Division, Docket No. 77 I 6999 in ,'F- #4 ..i
,i4. -f-•,- iv 14 C:) proceedings under Section 77 of the Bankruptcy Act and pursuant to Order 'I."; l'it
.
t=Al No. 221 of said Court entered October 1, 1979. hereinafter called the -,, 4,71";1. ti:.-
t °3
,. , •11-•-• .7"." a "Seller". and JOHN R. HANSEN, INC., •Washington corporation, hereinafter ...-AV'
-tr, .. -1,,,,:: 4,-4 • .„.f*I-. _,..,
,' 1 !,..r.'#,.. Th.
4,3i.ri.:'4,,,,„ ,..44-*'.."...--"r' called the "Purchaser". ' ,... -,
- "-t3r2t".;.,O'cr
?0'15 aga:ZIL. WITNESSETH : 1 I''.75WS-Seli. I
kt,-44.t 4"%:F:•„71:!4. .., Seller agrees to sell to the Purchaser and the Purchaser
•,* ,..''' ,,,.a:.. ..... I agrees to purchase from the Seller approximately 46.31 acres of real estate
..7," , Vil..... _r-,..,;...i
in King County, Washington as described on Exhibit A attached hereto and
I :.;--t. -:•1:•:43:4iz,i4
•N, !!'^- 'TX-Q.4,4 .-,:', :1 made a part hereof. hereinafter referred to as subject real estate.
-v--.iv
i3'• • 1-,,-.• ..rtt‘1 - . The terns and conditions of this contract are as follows:
e-.....k-----.-•-
As-X 4 4
1 .
, . .. .
....., :,...... -,-Isrs,..1.-:.-4.,...i.a.;
:7--:_
1. The purchase price is FOUR HUNDRED SIXTY THREE THOUSAND OHE
4 /;:W.. v..
,..,.„,., r.; . HUNDRED AND NO/100 DOLLARS (6463.100.00). of which TWO HUNDRED THOUSAND AND "...,.....:4: , --:,iv.::,',..,-;
.Ottefe..0"., 173 r;
.,:-.:,..41- •."':....t-w..gt IN0/100 DOLLARS ($200,000.00) has been paid, the receipt of which is hereby ,...4. -4 .,. t4 :
- .*.$-% iTik4„,i.e.
7,i,e,Nr1.4, .sV,i7f04,'
.10*/* f47'..:"04 4,0::
acknowledged. and the balance of said purchase price in the amount of TWO , i i '• +" "' "Cr'}'S.,{.::4%.*
• ,,,,‘ , -,•.--t
•••W '44`:..3:4 '"*`' q" .
, „ '
,,„4 .i'.7.1. HUNDRED SIXTY THREE THOUSAND ONE HUNDRED AND NO/100 DOLLARS ($263,1°03.130). ...Ai',
e 1
It
plus interest at the rate of /4 W percent ( ) per annum on unpaid 1
. . ,
*.i1-4.. principal balance, will be due and payable within one year from the date of I
..... :. .,7^1, .z,
. -- ..
t•
•- I
- ,.74rtaw :- this contract. ,5 ..t
7S(
. ..?"....,'. . 2. The Purchaser shall pay, prior to delinquency, all taxes due ! V
,.:...4-P...7.,e*
g."•-- ". ..,_ .1,.", --.. , on or after closing date, together with all special assessments. including '''. ,-e:.', sil.
tti
water charges. If any, and any other assessments of whatsoever nature
14tgA- •, 4s., C. • . -_,-
,"111E-';' eZt4, -04'. : levied or assessed upon or against subject real estate, and shall furnish •
l'''' '''' *44':-:ti.t.:'• I
to the Seller receipts showing payment of such taxes and assessments before g... " • c., •
4',.,!):1• , .44.-tAt...,,,'..,,--.. .--• -•.--..----1...: -
•-.7-- ,-.• •
I
' 3. , 'Ll'L-411.:•t...;_r,
s n.5!,
, 1 4"j-,4:" ."
1 delinquency. EXCISE 1AX PAID
I FEB211990 • . .., • ',,,,.,,,-,4..t 1
2 ,...,....,
'''''CLt-*'if :' s E0580'Z'72 •
,131
; "..t-7.-iii1/4..-.-;‘-:.,11
,:.4.'.4. .t - - •,,
- - ,i-
,.gl-'LF r--7,,,,, ,, — . -
-•..?..,..... "e'''', -4,1--i-
t, ,, ., ...-, ,•45— v4. . --,- --
4 ..e,'::-tr.-e _.„..4-Tv--*,•s"*_.,7!,_ ,... \ . 4, ... c , ,.. ';",.c.'`,V41,.f.i: ._
..,.. ...'1 %.• ' ' ': z‘* =. ..- ..,-. ,,.... ......,......,,z,3. 7,.7. ••••., : :.....
.' ,...--"%:'-'''+' '-'"---V"..'`.....1-.'....-: Za;.,'';:"'%'.. ..•"--1"."...,_,. ..
,;•.;>, . $,k 7,,,...,,, ... .- , ,, -. , .., . , „..7,-.4,,,.....,yx.1. ge,•?.., ----= ,,,:i.4...; , .,4f,,--;,:...-$.7 :Al
-.."'. ',.... ."t: i'.• 1 '''`'. -..: = ..r. =,,,'; - ' 'fr',47.. ..` ,' . a+4 41,:, ,,',.• ' .. 0,. ,. ' . f 1. ., , .4- , * ,t. . .44 ' -, "
^t -:� ,,=.v`,uc is;•:'1� "' ti . '.c.� :�`�E: T3>: .^,�',-_',•``. yw�'sr�' .,'�`'"rLoit" TMr, a .„-`.,Y`.,.„.,�
., ''✓ , '� sy` .; :v.;.matey , c"'r K ?;
s�. iyf� - ..�f*` x�Stv a r tg _ .e ,d• .,- r ,fR�n, :,...A'.;:g1a'.rc M "t.�.-
.P- .�i z, r,�4}+'.': 'zt^. rA-f '` '°.'^.xi�.o: •p:;:'-� 1.::y�' �4 f S ._,,, 1 p., Y`�� �� ,�t`�
r L $'`.},ts 'vi,, ,,,,.;t a, J4tom ,• v7 .i,..r£ P',,.� d- �,r'el.�,r`�'7•.+,,.,t',3`!%��� .,3?�'��-."..;,�i��.;�i�=,•w.� �,'_•=atiny�'�{ :s;} d� 14� *��' �M '�b4�"`- I ,• + ?��,�, '. �x'`sS-'''..• 7,-,,,Y-.',-fi.a.rGY '''� f ,,; Lk.+- x 't�,;.
r.'" s .F- - 5�,�' cr 9w E _ ..`t.".�,.Y.:3.' �0'.af-� '�. a`rt`ait� 1 ar .'� k.
*} ",.{`4 � � - .. ; fin' •i+-..t- .:•': .. .. ��....+,-',`.i,.,• � 4' -
-
n _ i:`•::`,,s*a:.r `%+ . ,4 3`.
.• . ,.iv'S:..�:. -,:It .,a.,;„^.•<".- .ifs...
S. Its Purchaser shall pay all costs sad M Of this aaUe k
t #�
' VS
excepting only boundary wormy.real waste commission and Seller's legal - • '1 br4 8 {t
'rti ' fess. _ ,. .r 3 k4,,y''y��++;;
;� �'i a. Purchaser assumes all baseda of damage to or destruction o! r � { 5-1 a
C„r' any improvements now on subject real estate o thereon and hereafter placed there and ,�`
_.= F,tilt' of the taking of subject real estate or any part thereof for public uses
fir' h ,L�•
+_ I and specs that>a such damage. destruction or taking shall constitute a ') ;. � y r ., r01 ' failure of considerat'_on. In case any part of subject real estate is taken ton " .
r � for public use, any coodamnation award received shall be paid to the Seller t �s°.j�
r"'"'`• c and applied as payment on the purchase price if such taking Impairs Seller's * * " *..
i}
,.-::
x ? security. but otherwise to the Purchaser; and. if such impairs Seller's - �'i�0",
N, iE t I K
a
jy Wei security. Seller can elect to allow Purchaser to apply all or a portion of ' iH, � `y'
♦*C' such condemnation award to the rebuilding or restoration of any improvements Kr
r
'� i. damaged by such taking. In the event of damage to or destruction of any ^ay.
" ,� building or improvements. the same shall be promptly repaired. reconstructed "` `
'.*'-..y`b and restored. or removed by the Purchaser at Purchaser's sole cost and ' 144�
' { ..h expense, i •F i mow. .
3
ion ML i,'CC ''.` 5. Seller will retain an assignable easement for a strip of ° }'.
,w: 'eF^3.tt",, r right of way containing 3.06 acres within subject real estate to be used „ b c', ;,`1
t!.3 F.�:'Y it `. for railroad purposes as described on Exhibit D attached hereto and made a ;:r: - _.
;fur ,, 4- it, 1. `'
' „1 pert hereof. Purchaser may construct one or more industry tracks across •w 3"_ ,,,.,:3'i;
', s , ..' said easement to serve adjoining land. If Seller or its assigns gives • t ht i•;-
notice in writing of its intention to use said easement within twoyears .+t
„y. from the date of this contract. Seller or its assigns will pay the then y ,.
r
,t'
, , ." : t fair market value for the land described in said Exhibit S. This right for '+'' ,,�.1 �(,,,, .
purchase of an easement will expire if cat exercised within two years from /,` et' .,let,
,. ,rY ,, _t v the date of this contract. X• '0 ,e,
FS. Prior to fulfillment of this contract Seller will pent to _ _ �4;- ,+ ..;
•,G ' fk; w fi y� :, Purchaser a permanent. nonexclusive roadway easement with a maxima width
",t I of 60 feat at a mutually agreeable eeable llocation for ing ess and eg ess from ° a.'s t
4.• `,d"•,S. S r: 1 subject real estate to Monster Road. f. i ^+ tpx v in f
It..if.'.: 0 ,k1
'.. ''' _ '•t•'X5�'
f - , ,.5 :J.: .t+
t t •- !i�7*"--.- 'r """'" ", 5s,ft, d, .. aY
`
rI '#Y . - Y ,� .. y •,, - ,i,- x ,°e
N1 yK i + C. ' , 1
V. . . . ; .
•
fC, '
,��• TC.— ,— - . t, ;,,...-g,
r � '' a �} A [R''iry... r
. Y .' •, ,
,
* � t-. , f% 4 r1
= `',M f• { 1 x
r fs .• ` .* :,.s"'t ,.410tV j ;t3 ''X-.- C' _1 .z t n;1`'w ;, y r1e- � Ka..;• ,�-£ d
,
Y „... -_, . 7. opus fnlf Wn t of this eostaact faller will reserve a 1O.
:;
foot wide. parsaaest. somssclwlve easement at a mutually agreeable location. r'
e r over and across subject red estate to provide tagrw and egrw from
- ' follor�s raalataf property eo w coos of subject real atau sow Xit o'r
r
t • .'
14C . IVY
asarat public street lying southerly of subject real estate. purchaser Sf
art hereby agrees that when it improves the street to City standards, Purchaser t '
•-; ram+" ^`•:ram" will dedicate said easement to w public for street purposes.
k't, ' A I
y �s I S. Purchaser agrees to pay the entire cost of any industry spar '+ 1
4.+ v
�s .5. ' ', 1 track it say wish to construct from w existing Chicago, Milwaukee, St. gbrr'`r* i--
11,
•'-„ .17
j Paul A!mettle Railroad Company track adjacent to the northerly side of A's r+l'
' i subject real estate. Purchaser also agrees to enter into w Milwaukee r,'. .Tr
l -r'. 5yl"'•C Railroad's standard fore of construction, maintenance and operation agreement 4 1,`' L
Wt �;*' 'r-i + a
u*'r. 't tgi; providing for the construction and future maintenance of such spur track at }".}}.
, `, theexpense of the Purchaser. r
- 'V.i a 9. Upon fulfillment of this contract, Seller vill reserve a 10
''+ foot wide permanent easement for see, maintenance and renewal, with right 'rr t
• },,' of access, of Seller's communication line as it now exists across subject . rkr 'IA
•#* • '. .. reel estate. If at sons future date, Purchaser, his successors or assigns, •.,� - •` ,++tt]]�
. A .4.4 . desires to relocate said communication line, be will do so at his expanse , ,+
, •,*r L., r''k� A and if said cum unication line i.e relocated on subject real estate, instead t :''0-24
,h of on adjoining railroad right of way, then Purchaser, his successors ^^s'r
„ •
�$4" ;, X)' or assigns, will g permanent 10 foot wide wement for the new ,, v `o
�V location.
,h "Sty f• Sp• ` 10. Purchaser agrees to protect drainage across subject real �'r
c
y^.1.y
• ` e� 'f. �'" '. estate in a manner approved by theCity of Renton and acceptable to the
". :t Y Seller's Division Engineer. rS '
.. ,n. x��S a.
' •:.;- e - 40+ , 11. The Seller agrees to deliver within a reasonable floe after 4,+ �3 f •
k '
As-. the ssscotlou of We contract, a purchaser's policy of title Lowrance is } T
et
r.,t "y`.Y --• standard fore, subject to all exceptions contained Chorale. insuring the .', ..-
}.�, 'A, Purchaser la the fall amount of 700E 10�1ID SIITT Tn 1f00EAJD Off r' *fit. �`
wi' j J
: -`vxa (. .a` f�Ain 20/100 DOLLARS (240.100.00). Said policy of title lauruee ;.
t i ,. 7.
-h 4 t ',,, J\. sill be at the espouse of the purchaser. "T1lI
.� -;^tea + :� 12. the Pt/rasher aser shall mot. without first laving the consent is ', « ,a 'l'g'
A:at� y• y,,;: Inciting of the Seller. assign this m.traet or any istersst wrsunder. ` 'T
M1 t. r ` -ems. a_
. clip:
• -.' .+.ah 3. k- t I y a-t.--wa s a 'r�eh yr t S " • a ou r�C�t
2' . 4' .s,...,' ' 'j -....'..-:,:----,9_,..y -0 �� _ -, y. .- - • r. --- ,�.t#. - _ 'YEA.. '7•^'}`_
� , y t �ia• Jig,`,+ 4'
/
7.4 1 .. F� '6..4Ydr Egj„fri.. .'' a .e z+ ! •�ay;.'iR=e^'�r-':,,s.�'- - - �.F• . �.MJ"
.1.4 r,. Y �-^l -$.�.L¢1 ''Y,_ °z. .va y:; .l.•y."[' �'h!?i+�.;.'w•;•. t°'r'',r •' 7,�,
�,,0 •, ,�4" 'l' ti a r I _ :'' +G�:.---7-;'.c_ :ti.-;'?. t I
;,:a= :R43 rrK ..oY S rt Q xr4 -k3err;_•. +'"' . -,.+ a.e<e. t...,.:7�_ 't. -:.
^ •'•^ .�::1S tf r' ('j','{=. e a':.n,�- = .,.w�.•� a w• dime Y`1Pt•. 4' a� ,,,.$. . "� ,- .,i
k'''' -T�-': _� al ' . y l� `se a 2.~-'•.- f-. ,`' - $^it ji !YS• iy - 1 v i� ..
`~F. 4.{ .y < ���a •.�'w 3 � a "�- ;n^ •f�'e.�.. �ta a�� �SP '°r, ...R�-�.�'�rt'� - Y± ,1^�Z`1:'"". Tip
: -.. • . 13. The Purchaser stall ad will protect the midget reel estate" -. -' .> y\ 3'
41 v I from ssd against b and all lfees W chiles et lies*batmen!erlaimg •
. ,- �+:::, '
` r I from or growing sot of ai ytbims done or authorised to be does by the Per.. =s ie r•,`.4.
� +, t K r r k chaser, sad obeli sad will fadsedly d sue harmless the Seller and the ° , '
-'4,4' •}� r g;,.. I subject real estate from any and all such liens, claims of Ilea wad coots •r ,i, ,l
•• '' y I incident thereto. The Pure-hamar shall end hereby covenants and agrees that .� ,. te`•
-tR Purchaser will release. indemnify and save harmless the teller from any sad L` ' =% '�^ iJ
a 4.. ,t i t. .% ,f%..k..? ,tint. `...
'S ;• all liability, loss, damages and clams for damage. to or destruction of ry t*"
•,i=EY' " `a .' - property, w• hether real or personal, end injuries to any person or persome 'i =c' ,Z '
+ ', ; 4; whomsoever, whether resulting in death or otherwise, attributable to the �� y .
ft
x Y 4.1 .. ` condition of subject real estate. g=r. `''�
r tti"^ = 14. Title to subject real estate shall be and remain in the •• '"" rr
a - �
,d{c 1•„ 7
Seller until the Purchaser shall have made full payment of said purchase �r
{
r • +, fi
�", ,� air '"..,,t price and all of the payments by Purchaser to be made as hereinbefore ` :• yL "•yt
. . _•,,yy -: specified, and until the Purchaser shall have fully and promptly performed
• iv¢' ir`k .c tr.
4. �:
r s t-f} * 5'. ••fh end every covenant end agreement contained herein. Contemporaneously -4.- .,ti j -._
S-, with the serous and delivery of this contract, Seller shall make, sign and s" • e k {41- ;i
1. k's�. a, , t r
j.::n'S' +•••(• deliver its performance dead to be held in escrow by Seattle-first Rational . i +.,.' y•-.
r
{+•.�. t ,,. lank, Metropolitan Branch. 1309 4th aveme, ‘aatthi. Washington 95101. for I "�'t1 � ,� ,
xl t`Ra r P-26,tx - v;+4k
�, • delivery to Purchaser upon Purchaser's full performance of Purchaser's • .. YY
, 'z`"` �f• obligations hereunder. Upon 1 Ale full payment and performance, the escrow 1 • �`: ., f .,''-•
._ ,-
�,b ,.e,gym,` holder shall deliver to the Purchaser a good and sufficient quitclaim deed ' •,.•-•
t -•.� . t i:, of conveyance of subject real estate. Said deed shall be subject to all 1...
�
cam. • ,`. -'. covenants, restrictions and end .
reservation. contained herein e to be assumed .=1 _ ' .r�.
Fgtiii-� 4,3'AiTand by the Purchaser, to all liens encumbrances suffered or incurred by the a ' *.MM-r
{, < x 4 z+y Purchaser,'end to ell easements of right of way. whether or not of record. r 4 O.`f°t',
t re, ,,R a
y� r 1. J1+:w:; The Seller shall reserve mineral rights. but without right of surface `r •`i
tine r ,�. r q"
,.5-. i, �` ,.t.�.y s' ester. - �� r Y K�
ri qx>t`". .+.,, 13. TTaa is of the essence L this agreement. L the event the ae}34 •+"tr•
.' ,„ rid-, Y
��.` ` "t s' i'.- Purchaser shall fall to mate say payment herein'verified to ha made by ,• jr:;:r".";o y
—,....,...4-7,'—k. 1,..74.- ---t1:7---.. - =. =.4.',.'." 't„...‘•'•FtvArj
s w s' 4 . soya+. - ;4- re;ri.m.,,,N, ^ti- k ,,.,r e ';4 e`:}
r f,4 r . `'.�� ,i.yam �•. . ` , .a + . " ."„r r
t,,, r:"ys^ -,-.;..,e i f♦7t� _ i •. L » r ;,: ` , + 1•: , Time ..';',.`bi yet'4' • i'.A,'•"t :41.' -
•
•�...,r.1' r. • 'f' ':'_G' fir- • . '.',±4 •'. ,,
64
"•.mots f �' ��"r"=�' � •_ �'{: '��� r�_:..•2,,4...�' .L.
fi•
•
-.1> •'4 k • . Purchaser promptly at the time the sass shall fall doe as herslmhsfere +T e� ?
.•t« •Nit: ,i
•
- .y , Led. or Promptly to Perform aspeoeeaaat er agreement aforesaid. the # '�.
,"em Sellergive notice in writing > r
� 'i ..' way to the Tareh...r of said default. apse!- .
;� '14 } Lyig the aatare thereof. and stating that unless said default or defaults ' .•-.•
:;
t ;q 0.
are cured within the period of thirty (30) days from the date of said +. �c" '4 r
-," • h notice. the Seller will declare forfeiture and cancellation of the agreement. •
rx�
t ic"«-��`I, ' �•y.", `4 and if the Purchaser. after the giving of such Kitten notice. shall permit . ,.gTF
y�`` 1 .ten : •. .M�.w[
•c+a fl4T+y g.. ,. j ,::
...4 } t said thirty-day period to elapse without having wholly cured any default or _ .�w�
' a .`^'s,... defaulta specified in said notice. the Seller may elect to declare forfeiture - -P'""> ''A;
i�' and cancellation of this agreement. and upon such election being made, all -' ?44. ....-7 9
R. *4exa;•',,i '";' rights of the Purchaser hereunder shall cease and determine and any payments ^ v*.
i -Ifi - i .,,',: • heretofore made hereunder by the Purchaser shall be retained by the Seller • 3
,.
v am
i .t r * ^t t'el.':- in liquidation of all damages sustainedby reason of such failure. Service .i• •c
•• •_Ta •�• , „
i♦
of all demands. notices or other papers with respect to such declaration of
T. .«,. forfeiture and cancellation may be made by registered mail at the following 4
,e,,, ', x�43 i address: - (
•
r!R* = ,!': ,Sohn It. Hansen. Inc.
• ' h 'a 3268 Hunts Point load l y -) `
,¢. Bellevue. VA 98006 : _
<�.,' ,,,,A,-,:� § or at such other address as the Purchaser will indicate in writing to theit: h
,:a•.. . ' Seller. Or the Seller may elect to bring action or actions on any intermediate• 2 •
• ,� overdue installment or payment. or on any payment, or payments. made by the ;�. •-.y, . �
-- ,,} ' Seller and repayable by the Purchaset, it being stipulated that the covenant `4 sr-:
+y� 4
'G'15 �'�., to pay intermediate installments. to make intermediate payments or to pay • l»4 1 yrtr i
Zµ*f, 6 :ter repayable by the Purchaser are independent of the covenant to makes A� * ems, ,�,
.. • ° ua-ask
� de.•' and that every such action is an action arising on contract for the � _ K �'�.•
✓{.;"+ , recovery of money only as if the promise to pay had been asprasaed in a ,y,;,. +�• ;, :�,
• r ,%
';'
different instrument and that no such action shall constitute an election w', tI. .4 ,:
, '54. N:" �, .a
� j ♦ not to proceed otherwise as u may subsequent default, and no waiver M chs i y
.. •,' �y.h4i '-,�' Seller of any default on the part of the Purchaser shall be construed as a _, �' •} � '
vt l;� +. f" waiver of any subsequent default. 1
,� _t."14 •
,�.. i:
t S L .B- •. .
y'17:-4. ' "'''-,: „'-;:-.' -:..';.- -F.'..-',::::;-. 47,1::,,---,.1 _:.,., • ". . ;-,. _,‘,":":%.,.*:, ,:,. , ''".:", ..,-:.,:".'.:''.7:•;!,,''',:1!"•;:4.:4":1':=_4'":
. ,
._.....• _ .,
. Y��F «iT�.. T ,- a'•My -, - .,;.,. r, k•, =� 2`.T
, _. • •-
, . -, • . . i
_• _
.. . - • .
•
_ ___-___—.—...- .
7 -- . .... :--,,„7-• . ...„-,4Y •••-.L . _
•..r-•- •
. , _ •,.• ._4, . ,. •. - „.........,,s.,:r:-:•••:•••- .•;,,i0,77.,•:.,•.,:, , :.;,,....r......,It•tre.4. ..4,, .
'.1*,'.. ' • '
/ rt • v'!"
,... • ,- . ,..,..r&: .•:•'-,s. ..:•.W1,:,-i., .,..4 - • . .IA'?,-,1:- .,..4,e,.
,4 ''tl ''' ftc4:.:rrl;fj:--b''.-r.::-::''1',..;'''.1.'n-it.I.S.--,L.-4:-.4:::.,. ^. 1 •-,*.1‘,.:;,+:,.:,,'....,. . •-•:!:::,:ILF:.i''''''
AA'.."'--'14,. -''' '''''''''--. '' - .e. ' AneE5:4443k
-;•. ••• . • ,..,• • --',-F.:•....1,. ..,••••,••Li,,., ._,,,
-,-. • • .,,
. - .•.• :-.‘''•S'2iect.'•••i0•,', ,ToL-•
. • :.......F,•••-• .",- . (.1,--:",:ii5-,..,) '• ' ...
2::i, .• ,.:_
-- • . A• . . ' ' '''',..."......e.....V,. t`,.',..' -.. ''',';'74,...11:1,.:" ',.., .... '''''' .
' . a ;.,;•.....:. _ -,.'--:;',',' •• ,..'.'9'..:::`,7..!'i...k 6,..", L, ..; _,,
te. ., . .•.- ' 10. . .. , ," -,r..2.',.",t!- . !'••
'.'1.;: ,. .- . ".
'• - •
t`0.., S'4 7-11Vef.7%' • lg. The previsiess of this egressat shall be Wallas epos mg ' "-
2:42 %•„..P"'sA'a„.
t , ._.,
• i Lars to the beekefit of the pertise harete. their metesessre awl asalassi ....., 7 ':4:.1.",'W'S..."-'
- ,'..,:';‘ •,, :/-,:::
Iti ' '
...:4Z,I .. 1 provided however that this&greenest, or soy right ferule, ehall mot be
. % . I assigned by the Parcheesi.thither voluntarily or isrelesterily. accept
"41C• '..,;.;"-'.-.if7.'“'"
4 i-_--i.,„ ;,
:,,,p........„.
,epos written sorest of the Seller and on the tens mid coalitions set
t forth .:
l meth written comment. end tray immigment mede othenrise thee as is
: : Ile.'''-••-•;. ..zt..-"I•
-: -1'-; • '.it'f-_•!
e
' ' tt, this section'provided shall be mull and void mad the Seller may at its *
c; 2•', ... • ..4;j:-..4,:t 1:i j r•
. 1r c .--. ..?,-',,,.—Ii'l r'f:•'
option declare this agreement forfeited and canceled and may avail itself
,,....3 .
•...'....' J. '",c
X. • - *.... .., , of the rights and remedies bereinbefore set forth.
rt`ii 1-':::•,77-•• i -• 1:/, *.ii.,e -7,, .
E
.,,•.,- :....
... . .. .._.
1. ,,. ... 17. Upon the election of either party to bring suit to enforce
.
any covenant of this contract. Including suit to collect any payment hereunder, ' '"'tr
.,..* I .*',-11. the prevailing party shall be entitled to reasonable attorneys fees in
addition to cost and necessary disbursements. "Prevailing party"means the ' .. ‘••'.- ‘...•,...P.1,1. e
•••••-• ',-.:',;„•i,••-.."1
party in whose favor final judgment is rendered. .1
- •.4.:..--%Itzsl.
;414: 4 ..„1 i le. In the event Purchaser desire, to divide or subdivide subject - 4
• '.7^P...„4.t e;!:,-"/„'„..?
^1. ",$.t;trt?,./„..„,• 4... ' '., ,7,4•:"4, 9',.."
4 -•V--4.1.4'*. s expense real estate at Purchaser' . Seller shall sign and deliver all
' r .'-1••••••,14-• . .
.4.. . _ „.,...1:, -, - . .;;?: tyl.•-.4,.,:,..,
applications, petitions and documents required to be signed by the owner
under applicable local governmental regulations. provided however. that ,;!
•
.
0., ,"..7'-.1.1.47,:i,t • '. -1 ,, ^ i'.4:..;,.„_•,-a...1-
.'t: Ir''.7:.: 4" • Purchaser, at the time of seeking such cooperation, bar fully and faithfully - ' t -' -.?..i. i*:!,-,47.-•:',z''-;;;;;
performed Purchaser's obligation@ under this contract to the data of such -
•
^,:-t„.. ,.1-,r.'21:0-`,t-_,- •
• i
'
1-.,,,:t- application. . 7 ''''.'`-:‘' V..::1 .....1,.•
1 • .,...,'"....r....,#•w•
le, ',Z.j.•,,;Al',
i
IN WITItESS VRIREOP. the parties hereto have executed this
., ' •'S.7.:w"-:•w, ,1,_
I. . . ,,,,--. •.: tvife.44=v4
s'..‘i,0 , '. f''74 1,-,,e,•-•-)tt,:1,-.,,,,
0 ' ?..,.'..-4".;*.,;- instroment in duplicate the day and year first above written. 1
,A.' ..4 !...4.,"' ' ect - '
t . ' - C,'..V,
RICHARD B. OGILVIE, not as an .. -.. •
•
...'7 •...:-. ,,,..e..'.4..../,
••'..i- '• -''.i..7:C.7'. vidual but solely as Trustee of - .."..:.....• ",fle4•:'-';'4:-..7".&:l.•
'.. • . 1..:-
it.,. 3 chi roperty of Chicago, Milwaukee. '.' -;':.kf;Vc.!
•+`,..:-.4,..- lit' and Pacific Railroad
i
4 414% • 1 ,40.4k • , Debtor
_4",:i,' 4 •,::7,!,,,,..:.;4-4.:!-,j,
ti , ..:t. .4:-.i. ''Ir" ',1,421ZATi4
1 "...i...1.-e?Vol-0,7e17,„,„ .
, itrITESS: 11.11:10ILIFIE ''•,i'r. .--":?•-'1•.:4V•st-'••.
4' • ''' "' •fr''''t'•-'?i..
, ,..,
*.,` 4,.-4,„7 I.
:IV -••••r.J''i l-
.. •5 q".7.n. ••..r.‘
. .. ••'.-- ' For said Trustee : -...••'`. "..4,•,-•
;•r". •';.• lt, 1 1 ". •'''°e ft G.GRUDNOWSK1 Staskaf . • i • -,,V...""s,.e"..'47:ti:-.1.''..".7 1,Attest' JOSS R. BAISSI. sm. . -- '
...- ,„...„-,,,,,,,-•
• •rwf-,0...,-,-.
41i ' :r.'40;
.0,, .
" 4../1-.1. r.-L6it''''77— --:-• : .-•;:t-.4'4-4'-„,
74 ..,,,.--,• ...,.:= 1. . _ ......•JP.. laid. , 4- 'it... ,•,-,,t...&,;!-,V,rik."1,1
i, ."-:7 ...': -` , ir - Secretary , ' -`.. .1,g:;•=, t.'
1.... •,-4.,•1'
.-'' ''''''.
t :.e,
-6-
-••••— " i
4 ' ',.i:1:';',:*;"1•:!1'.
- cr".•.;',..4a, r, ',-'le tr..,.....
.,. -....„,..
, ., t1.4: ,,,.,.. . ,:::..f•-'.,L,.-- -,;- --"'.:"..-. "L L -
'.;.;. a- .0-14 „.....tr,L *,*,,...,. ..f.-4. .„,,,,;--, .•-,.. -,. .- .. .
31,-;„-•,-. ....- .,-, ,-,..-..,;.t, If t.' . * -. - . - ..• '--: ' - - .-, ,.
.,. : - ., -,,...- • - I_ . ' , . ..-.,' , , yi •--- -.:,,., '.. ';..:•triW
.•.,,..' - ;445.'• :•4<•1*--.. ii••••,-.!'--,i*'•'".7.-iI•-••-• '=7 • •
'''-isr"•t'.;&-tii';;;-4-fag;: .-.•t•s-1-'• ,..:•„--t•i..'-' -y:1442,,, , , -;, , , , - •
I 2 ,......
/ ..---,
. , .
. -
•
_ ..
•
i2.. ,
,.-. - . ,,...._-c.. ,- - .- —..*,...-„,,7,•,:,_,.._,..;. _ ,
• . . ....„..,_,.,; -.. .,1,,,..vr_tecil;..01,..",,i4; r t„
..,.'
°-1„V:1,40., , ,' ,' 4..4'/.••„ ,„ • •
•' . .AW,../.1,/7„,......X.' .',,Ilz, .:. •AA ..:%A.Tt'',',AT!,'..•`.- .. •-;'..•". oi
o. .-..s ....P--"1-_:,;:f,•:,,-0-,A4 ewpf•-• ,•,-,1 .‹,..-`,".•"- '--
, - -.,--,.-..',-ci•••1;,`,•,...--.:4--
,,,,v4.4c:$:,,,t1.1,--,..a• -,,,,v.i.gs..-: - , , _„LIN.,.=1„?f.:,,,,,-.,,,,,%/;,141-A0a,,f,4f. T f - •'.• . al 41•NT‘IF7 vX:I. .,* Si....
'' • • - T''', , ,,,,,,,tiii*-41•ct..4"iNT.• •''' , Orr,"•44T ..; •' ...4.7..,-...7,"r eV, •.7c t•••-T.,r,„
- • • , ,;,,,.1::'-, cf/.71, j4V'••ds,',..
• • -. .,...-....•,:.: -,.3.,:,..... -, „ .,4.- ,..,, ,
1,4‘.,%. • - .." 4.-,-_es,...:•-•-
% 4 . •
• '. ', . , .,' '..-.;',.....; . • , -_;,:?.'",./I'‘; .03:'1... ' "., .:01';',.'-‘4 .-?:,.
- r ' ':.:-::•:: "el* ' ;':.2tr A •
1(TV 1 .:-.s. ';',1-':: •..4, .,. - ,.., tr.-.
',,,......"...t.r.,i.,:,'
'T
'1?4'144e..i • A
'::..e'40..r.;' STUN or ILLINOIS ) . , S....
o,i-,-;..,•
•'tor- •' I U. • 4. ,":/. ' . ...4 '.." '''./2
COOT? CO COOK )
. ,
, V;day ;.;.,'",++ . '4-,04,,,-•
thfo f/ af Ire 1 fC14 riild ,A.D.. 163S. before ma tas '.'' ''''krAtt•'- nil
.
madareigned. •Notary Public la amd for County sad State. penman; -
•gra11624_,:_,_. . to me known to lia the identical ; 4 1 el......1.
lel
i ,r,,,,. ,,,•C .1 id in and who executed the foregoing instrumeat, and acknooledged •,t..-,; '',.•:.•:1...%.* Pe
, Skri,,'''' -;. Pe that hi•Mipamted the same as his voluntary set and dead as Trustee aforesaid. In SDI
• ";.4" '' ''.•
C: 0 ..-•-, . ' ' 11',7A''.-44-.. qua
i: :. ..1 i-;- ,..-", •:- "••1,.-1)-'41i-' I.
il-Lfe-,it.,,,-: , :._ •- -., imi -...•` • 44.4,-----,4 ie.
1,•,,, ,-,& :- - ..) .!
, ;i...., • '' l'il.s, .i'- ;.,14 Cou
. ',.t .... ..., •_43
`;',1-;A'''k t • .„ • • ,
# sun or wAsorscrom ) Notary Pub e
•
II lrMIST/N.KFTrAN
Noe.,rul.:i.,C.,.1....t.,...M.
III C.r.-.11.01.•Ll.ii •No.33,ins
... .. ,-,. , -4.71
-- . .., . ,...... ,..„.••. Soo
Sho
aai
.4-..,-;,7- •
I ... oar
t 7
•,-v2I- - - couNrr or "46 l'a e' ) Sop
- -,, '••' • .
On this it.6 day of ad/ ' . 1920, before me parson- Tho
')oS!.•-•• •'-‘.... ally appeared a,--„..6 etd ' . 8. 1411.........- , to - • ".4'--1::::'., 26
se known to be t SAt I.= ••end jtAa.-1. /4.. ; T , respectively. ,,, -. _r.-.
•;
ti.:',:-:14,:-.1.of JOON R. HANSEN, INC.. the corporation that euted the within and -
. - ',.' Ilte
foregoing instrument, and acknowledged said instrument to be the fleaqtrid , , ,. ,
26
voluntary act and deed of the corporation, for the uses and purpossa.zbarela Itro
s;:":',-; ".A... mentioned, and on oath stated that they were authorized to zrzecute,pd.f.61'.5 . , ' -; •• , ' '"•,,'
'."•-114-'''s instrument and that the seal affixed is the corporate seal of the glz?Opa7c."'.. - • 4 . The
tion. . •--fi
.-'-e ..,,f;'31•• •-; ti- 'I ,•-!-•,....-..., IMO
C•.••,,,..','' ,' of' wit
%.,,,,..• r IN tilitIESS NHEREOT, I have hereunto sat lay band end attimad Id: " • , ...,..
Of
7,1.;-'.•• official seal the day and year first above written. . ,
• trill
fr7: .r4L...1.. -',I.•....... ' .. •
-i114-(4rats^ v g 4.- • . .. I, . The
..p.,,„;•'.1150 c'," . , Id
4764 IMOTAILY TWILIC pi.and for dr State f Washington,
residing at lkyo.tiri.40,r-,' •. .
'4 • - her
-• ?"14 It
''''.P,0 CU!
I
1 .! k ", fly cosmiesion asp/robs 9-214/ • ' .i ..• ' -, ', ; , ,''' . , foe
'* ',Iti° cox
' .--
=air;It The
.% . . • ' • ...' ' l ,•,., the
; - 1.1
. ,
Can
14011, - ., ' .
• ,T1'./ The
- -
., ' , of
*,":„, .0:•• • ' . Th.
f••• 4; ' . . .. ,
-
., .,„••• ;.," .
. ., .
.. I.. , . .. .
• ..
-
•:,...-r,-,t-, k . .
.
f,''
, , i .•• . . .
.. r • -..,
, •'1.• ..."...,
) P-4a '
,,,..,...* -,,,., . ;
, , .&
_.
4
• /.../.0.-4...............11.,,"^r; ..... . .1.. ,,..t
.0./1
ithessa:1-3 . ,.. ,
k7'. . .- - . •
•
...•. , ,.„• i,."- "'" ,• . •(--;
,
— `,'i " • '
,
, _4,•..S0.Z.,...r.,Sttiot.' f..,-,g.. ...,' •• ' --- •••.,,..4;...-_:(fox',--- •-e- - • ' • ----.1'-'0
, ) ,.,.•.
' •-.10.. .:,,,-„;,,,,,,...,-...-4-•-.— -. ...--,- ' • . N4_,, • ''' ,o.T' • • : ' e-.. .
,.1", ...,..o. ; t, , . ..., . e„ . .: , .... • . 'j: ,;4'.',...T., irl`_" ' '•-• ' - - ,,.
.44,1'4,4.4,,,... ,.' ',...11^,* ''•,.• '' ..:_4•3.,,,-• _.'; '--::'f, ".4, .. , "
tce. ". "...,,,I. .• , •••,.,,5•:-..z ...a.
.... .7".•• g5,24,k4.41.4.-,•.,,.t./7.'. ''',./i-. ' ' •••-•-• ..../Ter.,. T',..'''
ft,71.; 4.-r 4.4.•,-, :‘,.. 7", .1 . - • ' .
•
! _ _ is-- -1 'A,e P.,.. .,,,k3-',' ." ^i:-r_• `' 4,-- r— L- .,sP . .r^.1'^".a! ,-t-- t ,'fir a,rr..:a;,`.y-ter—=
! rt` Ce`i:f _ ,'�� rl�.�:%- .•�y• _ 4 .?*$�`�•+'�'4'pr}xY:`e���`^++.t�'• )1:4%
a1e �..i,.,r-~'" y " 'tir`ag�''�'^•_•'l-- •,A�`�;�:;.µ,. t+,d•Nra ' t '.`+ *"^�' !' ,y,x"-4:i'..e•. V'e' 4 ':,vy'a"•i,'}'f. ••1; ' Vt+k. }$q, '' .��Sf+',+mm',`tt7-* ?.sF ,is. .r iY:y=„4. ,f44.1-' f'Ai..1 1'-1 6r. glad 1-' c'.:.3,siJz
' ,a X✓"w gsla$...i - ''•f'':6.'k�:$;-,aS. #Z+',�, :,. `"+,,c ..,3�`r,, .,F i{5+ i,:..n . : 'i; + ni$'y ..,4'.'tx,i_?
;''''' • • .:, ' . .ci",. . A.N-7-:e.4.- -..0...,-,-,... ., :,,,,.. ,..„, ...
•
:-'. "Yrr.- Chicago, Rilviukse, St. Paul Si Pacific Railroad ..f ,m v •' N t 3 k_a3
1F ., M.•a + I 'll!
v- dal De0Cripticn of Procerts TO Ra Sold. + ' ,` r.. •
r, ^ That portion of the southeast quarter and the southwest .+r w
Wig,. 4, goartar of Section 13, Township 23 North, Range 4 Vast, + ` + :r bawl:
V. B. and that portion of tau southwest quarter of Section ;% feet
t1'
d 18, Township 23 North, Range 5 Vast W. N. all in Xing *, `+ r
County,,sashington described as follows: :.;fi , Thaw
PFCu M.
f Beginning.at the south quarter cantor of said Section 13; ,••.,.as.
• s.. 'Itl sort)
• z .
'4: Thence V 0065e•2e• ! along the North-South centerline of + t} Thew
c "`•3 said Section 13 a distance of 864.84 feet to the southeast •..- �. - r cent'
.. corner of Tract 26 of Renton Sborelaads Second Supplemental bra 1,00'
saps, 1958, and the true point of beginning, • - a
le
• ^r. x •r cents
! Thence 8 72•37152• • along the south boundary of said Tract x `'' ..1 soutl
.. 26 a distance of 382.60 feet: •.' ,- 1 ..:...s '
a ;.0 Then,
Thence N 70.54.02• M along the south boundary of said Tract . ` rout?
� - 26 a distance of 73.51 feet to the east line of the Charles -47• '',c-.• of s.
•5 Brownell Donation Land Clain No. 41; s �,i `
>J' i .c. v 'I y Then.
=i, >�'•- Thence s 01.24•04• s along said oast line a distance of •- .. , #:` , dist-
-L 7; 950.58 feet to • line 35 feet southerly of and parallel `" ' +' feat
with the centerline of the existing most southerly track f ` said
`c - of the Chicago, iilwauks;• St. Paul & Pacific Railroad
v $; .,/ tracks; - • {, .i••. .1 Than
.-1,- ,
".--1.' Thence along said line 35 feet southerly of and parallel `•' `t ", e - , ,'r feet
,.; with the centerline of the moat southerl track, along • ,z ;. •t r.. Soot
curve to the right, the center of which bears 115. 132• I _ soot
s 1� having a radius of 2,790.19 feet an arc diutanos of 659.24 ,-..., ' `.;'
Then
-t .{ -der fast through a central angle of 13•32.14• to • point of I ; .' feet
s, compound earns: - 'i.t - # ..
` Thanes along a curve to the right, along said parallel line, -, L sµ�r� True
the center of which bears S 01 50•le• V having •• radius of ' i" . Then
�• 1,102.46 feet, an arc distance of'807.11 fest through • of 1
{�� central angle of 41.56.46•; „ar'
;} ,•:r Thence S 49.53.32• I, along said parallel line, a distance t -- Then
"-i.4, of 167.07 feet; ti °f 3
9.- a?' !�. m '�° Then
}� Thence along a curve to the right, along said parallel line
=: 1.... ..ark of
%�� °r Than
'yF = ' ,,f of 3
s` � - wry. -.`• Then
a 3� .,+ • of 7
koes" . 1� • "'
. • ' fir.,
k° . '! }�e.'''''Ci',.,41Cfi,
TM!4"; + '`rT,'•c ?? �'-'". =`ti ,:,,.- >..° `y �T��'f i„..„'�>.r -fdvt.�.j .,,,, ` �+u aF 74 • -
yl
.� yo ,ti:{. ]s, `•.. • er. ', `t''"•l-.,.,t�:•k;'" " n,,, Ire.+- f * ',.rY. f S P 4,�.r �".:,,!^' ��^^ y e
., : „,_, ,r• ,' •f y` @'f - - . ,t. I.P: .a..i. %` $4.\ u - µr• ��'•f
F[ �' 'STY ' �' _ e ' ' •r� •- ;.. 'aS X± .'.�
r� f 4".._ �' . ..• r:9'..r-h• •Y' g. x.,fi,�, t sstir:`r:
[,
,11l‘
-..,r, `,A y',5• - '.• '41
`, rl:ks% Lc.-a1 description cont'd Pegs I `}cq*ra:
,.lk`
` �' having • radius of 1,622.76 feat an arc distance of 309.67 - " �f x 1. ; �«
- foot through a central angle of 09.4114e•; r 4..,'.J of
J04 i''' Thence leaving said parallel line, s 40611,44■ I a distance ^.2,,,t,
•., fit' a• of 126.24 feet to • point on the south line of the Burlington ''. *,a'.".'
S x ; , .z ; Northern Railroad Right of Way;
" ` •te .tk,'t.�` Thence along a curve to the left, along said south line, the s`- ,i•
> 'Y'`"".•r'• center of which bears I 49048116• I Laving a radius of '
..„,.+*5• "F''j 2,005.37 feet, an arc distance of 549.02 feet through • • . . i
r w. ;,t +v "; central angle of 31'17'19• to a point of tangent on said
++ - ' * - M ` south line of the Burlington Northern Railroad Right of Way; ,'
i .4 4• - t ' tY II,
.
+ ;u R.74)..t..TIC ]C
a k' x Thanes continuing along said south line, s 71'29'01• I along •��.k`'•
x:s- �YS ,:C .`' * • line 50 fast south of and parallel with the existing'
S -`:-. • ,,..; southbound track a distance of 026.56 feet to the west line - -• p
#.fy,1lr, .s r of said Section is; -t '.,`
Thence continuing along said south line S 71'29'03• R a •;r .
•
4 f F` distance of 65.52 feet to the north line of the south 650 '
' •.` - feat of the southwest quarter of the southwest quarter of
�� said Section 16; W
t. - Thence N 69•10'25• w along the north line of the south 650 ` r
'•` feet of said southwest quarter of the southwest quartos of
Section 1e a distance of 61.57 feet to the east line of the 1 .
r' ,-.1s:. • * •- + , ' southeast quarter of said Section 113; f' - 1 ,
•.' . 4 +:•s ^a� Thence N 66'13100• B along the north line of the north 650 "; '^
h $. c ' feet of the southeast quarter of said Section 13 a distance
- ; of 2261.41 feet to an angle point on the south boundary of ;'.,V
" Tract 25 of Renton Shore Lands, 1256;
qk, -.1 `. A, C; Thence N 33'07'250 N along said south boundary a distance •
g, of 154.51 feet to an angle point; •
t ,, •
Z �e r r. Sh• one*
]e7.]2 !1't0 an an 32" IC along sapoid south boundary a distance .. ,2.�,.
C
' ; c 1i 44r Thence N 6]'17'25" N along said south boundary • distance :,, (
..,.• , ,•L. of 171.17 feet; ;x',, t
f- - . '
•
;' , .• s r�y Thencealong saidsouthboundary adistance a 46'22'22• N ' I .
{, of 324.66 feet; o
. - Thence N 72'37,52• V along said south boundary a distance '
of 76.33 Coat to the true point of beginning.
c . ,., !, - EXHIBIT-A , ,.. .-. .... , ...„
.„
, ,,,...t . .....„ :,...., ,_
4-''' •, M•:wv'N �»'.
r'.ei;., i' ,,' ,1 + '- x '4 '..' ... :.Sum .0 .F i + �, . -
i.
•
y
,Ld3n; ,
-, q'• - 9pC#.w
' « •
•
`, , ib ,+
) t+
7 �;
a ' :• Loral Deserllvtion of the 651 Easement. I , I , E •
��"` 'PsmT; tin,:J 4 ,
That portion of the southwest quarter of libation 12 and tha f <" ` sx:
3-„. • southeast quarter of Section 1i all is Township 23 North, I R � •j<
Y Range 4 Last, W. K. in King County, Washington described as E sP
" N follows: i +a,
,hex • °. Beginning at the south quarter corner of said Section 13; 1 ' .- . SIP s l' ;,.,4-.
r""
-rum 1 •
Thence 8 00•SB�28• E along the north-south centerline of I Y } `� ' N
" said Section 13 a distance of 1327.26 lest to the southeast c
44
s corner of government Lot 7,of said Section 13; .» , � '}
Thence 1 87•38.53" V along'the south line of said government •
•
.7-111 1 •1 � .�
>; Lot 7 a distance of 429.05'feet to the east line of the
} Charles Brownell Donation Land Claim 1o. 41; '-- r r �k<
•.!'m Thence 1 01.24.04• E along said east line a distance of - }v •.
Zit1,ot 332.32.feet to a line 100 feet southerly of and parallel �'�
with the ceatariine of the existing nest southerly track ,` ' '
of the Chicago, Milwaukee, St. Paul and Pacific Railroad • a ��
tracks,and the true point of beginning, a
r
r
• � 3,f Thence along said line 100 Neat southerly of and parallel ,' ro -„y 1
,. •. . with the centerline of tha�nost southerly track, along a
curve to the right, the center of-which bears S 1S047119• I t
" having a radius of 2,725.19 feet an arc distance of 663.50 1
..'"gT feet through a central angle of 13°561690 to a point of x, w
•nd N ,-Nib.
t����-'t. compound a{{r0e, I w . F.E.�-�.• .
fr ",. Thence along a curve to the right, along said parallel line, * -y�•`
e *,,. the center of which bears I O1 SOFl8• E having a radius of
1,037.46 feet, an arc distance of 759.52 feet; # '' r ,e
e 11`4 Thence S 49.57'720 E, along said parallel line, a distance - I'`. r' :7::,-.4-,(.
y '•-.'„ of 167.07 feet; ''1. .M rib-. r�•
i
,• iit'"r, Thence along a curve to the right, along said parallel line ..,,-.:,,,,,,..-.4,n ,
having a radius of 1,764.78 feet an arc distance of 295.67 I t r "
feet through a central angle of b9•41•480; I -
.` - 4 Thence leaving said parallel line, 154•35'37• E a distance
• of 308.43 feat to a point on the oath line of the 9urlingtoa a' x ' °'
. # • s
• fa Northern Railroad Right of 1Wayt
^',.'.'''
t
T 1 n '
-- Y ate`'-� "f:€-
•
Rt
-so 41.,
EHiBITB ib M: :k
d is .-...,4-,,,--r 4-,ti 4 ,. R ,yr. •A. 4. ,,$
r�S „.,.'� �,A '3' _a r_ a '• .: .rye,u r"" `,4,)...,'
'', '•+. r"`.' s'�•C *Yf,`.
r
•
f ` mr.. - r'.`•! k`P,,,t.6 - r ``'.vim,,,... .
„ ';':_TK:r ::,'""',-,7.-, .ram 1 .• A •- -, 3 .
..i tr - •. - a-r.r.t. ♦ ..;F,,.""` fit. .•
.:Fss::�:as st ecaa�twonree....��. _. . -- ---`--- f •' r. s ; Y sFz�, 6 & a,
J1 Fj. ti 3..j i4.1
t •
Legal Description of the 65. Easement. oontiswad ,L f,
:''''"If"1.4
�` r = Thence northwesterly along said south line along a curve t.t,„:•-;.' •:-71'7:�4+�11 .*
. -0 5412 to the sight the center of which bears Ii 35•24•230 i ^?f ;• � yy'
having a radius of 1,005.37 feet, an arc distance of L • � t
252.64 feat through a central angle of 14°23.53•; , e
`s Thence leaving said ..outh line, 8 40.11'440 w a distance x• t�
x4.. of 126.24 feet to a point on a line 35 lest southerly of
, 'Fi and parallel with the centerline of the existing most ,
' r southerly track of the Chicago, Mllwaukes, St. Paul and . � '
A^;.t Pacific Railroad tracks; , ,
a y, Thanes along said line 35 feet southerly of and parallel �•
, ,,..' with the centerline of the most southerly track, along '4-'$4 .'
a curve to.the. left having ■ radius of 1,829.Ts !se! xt tf°t i
an arc distance of 309.67 feet through a central angle "^ !-•v ,&r ,
b of 09.41'480; • •r x,.r .;u�
Thence r 49.53'320 W. along said parallel line, a distance A;'A' �'
of 167.07 feet; :, ?d} .fw -
" ' Thence along ■ curve to the left, along said parallel line ;k'. . ` • ' +
E* having ■ radius of 1,102.46 fast, an arc distance of 807.1.1 •I.
`• ��
;' � lest through a central angle of 41056'460 to • point of r t' LL ' ,
a r 'tic. eoopoeid Clime; t • ti .,.. t
+J
1 , Thence along • curve to the left, along said parallel line ► • * +�
gam;. a having a radius of 2,790.19 Lest an arc distance of 659.24 •
` feet through a central angle of 13.32'14• to the east line ; '� . "s
• ow of the Charles Brownell Donation Land Clain No. 41; i i , , 'fn`•
.
Thence I 01024.040 f along said east line a distance of f f. r ffi
4 , 67.97 feet to the true point of beginning. i ;"
`(C,' l p,
k .',1i' .� ' '9L^rx' N
,c:'` ,� N AIM
,. t . .:��''e' r eta' N 4A1 Ia
7 y IT S7 3. =>?i: f. Rill N
r s a rZ ^9-q,,
• EXHIBIT-B f•, wn. ti _.. ,.
Y t 'c,,m,.. 1 y +.. x, flja.....,,..„,,_•„4r...
•
s.. . ..„
;,
, .
. ....
y. '6,,r r,f .•• _^4 +_ ,-,..v yw.^M 1, - ^.Y' f• ,' ,:� y *.yi ii Y vs
4.
1,!£� + M "s,''rrx',v* r . c-''`., ; c. ".N r 4'3.-it 0.,,,,# '"'�•,t '4
'�.- ;f. ; • 4.+.J......!i3-,r a, 'f.. `" X �. ^ 4.1. ..-.. ,-'`'."•
' .., '?...t'iwr„i6•r,. t `_. '+'', '�``,t '�'`q,, :r +� ? •.vJs"1,Y°,. t a+;
lr • ' i{ �j� ��(r� 7q • �
a, 's a ,.:.'�' + 'a,.;•� •� #Z• —!S?z� .iw�,<4«j" -�^i'^r sX a s 1 • �� �� 1.� ✓ems ' tl ).
' . ) ti.-,4 t '.k # » .); .t w'rf
j '- •;•,:r •, a=a ', , : �,`, Y�. �^, „ • 1"�+,-•.rU, I.,
a
',3'^,,*„.• tt I.' y .7 "' ;: • I;4'♦`S},,.,„. a ,,.., ,441, ..i yi ) .` ,,. Jt` .7 r"4,} .;..t: N n •j 1 '+�#+.,, •4 . }. :; '1".•' C.:t.'Y•',gn,:Z''",nti's, '
,.,,, ' '', y. '-r' `• .11 s .i4.1. *e7 ,+'.. „Atit :�'.. z ;,t ',:v •',}' ,•• ,I ''�yc t ryr,,,,i.,4,, rr.,. �. ,1 i� "ny.`' ,
r F' m s ?+' •lfi <. °f..F ' *; ,i, , rJa, �"s �_'t :„ . 'a y,... "1�,, ,,. a a.;•at,, +` 'fit ,k$:''2'� P
;4. �;�.�'�� .'3' �, ;, \,� � s` � ».f{ "� � � � � •*3'•ri �{ �,'�� (�•.i��47.{ �4.",� , �S¢ � *i•`�Y�w,y% ,r"�,'ri?'•°iy�•
. �t' t sy��
• • f ?
4 .•f ,tr..�. ,,, y:F+,Ye;; ,t 4 A,?',J•1'�+ F }_.,Cu','..,whrq 4Y S $'{�t ;.:r,•J "+•}`f't '}: ._'4 1 • _ ; •5� sti'i„i
t 8002220257 �L
A': Y `M1 laii . .
:ti %..:i •
it •e ' n: s•:
•
•
•
T.iY ,+1 yyam�.. 'f V
•
ham ..x '
z
•
"°b+"+.' ` ,z11, 3x' a�S'• . .
4,.•.y,.t``���i I
Is a'.
. f. J 6 'W"lY. 'J ''
iv,?A I;;-.9 4F's I''t z
•
•
„•'•'=.'........ '''''•4,0'_k='y`_.., .,. _ q:^'.t;s.1, z:q-.,••.•„. .. ..,•,,.:,
•'`'•; ry .i-,4, F1-. T� .s,- ,4' '4 j:
d�' '�C'i' '/. � - "1•!t_v:::.. '4 .:r5•h:•.:.t'ft l'.. ,r.4-r ,t�� ^! 2•
'1;'
�,9� :�i:,c.n'.,„,,,.::',-' - :,i. ass:`. ,'ic,:, ,r.. Jam. 3.•., •s , 1nH•e. �];� T\� \ ..,rr.: 1, '.'
f=`` " a'i. ., Ste^ �•!Z l(�.''' 'n4.. . . 'i.:y.!y"ti'.i' ;:�%4i •f'T. ry� q ny,,, . t .7 d l'.,��y!t��j
•
s T•• , \ t' • Y ' s •,,� 1 f Yi;i R" ..,•x`e• ro. e +,LA �CrZ `r• }'! . 4'n;;),4-xr ,'I-a:,.` s:'', fia a i,-4:i; *- T`A. ,, a`e,^�'i .,.:,�',�.�
+ ',N S.t� ,. ; t ..5. .;r..' * M",'; '' .3 S s ','f1 Y,J a � F1 r'y - �,. 4 i-.:. yj, ., ..;-.
a,W` .Y, .t ) 2• _ ''k,", ,ad" a i 5 7. �, �. :.F,, .. f�. '
•., ., �, s{ t'' s'' ,. :,. ,:j -, - "'0, t 4.;�4-y.. :tom,,Ia"' itst`,!,.„,,''•-r� : :; ;
\ t. • K �' '.i` 3 y{ '''rifr0fr* ''`y.. _ .. t ,' ' A i.r ..i.':•m a, '_.4-, 43
•W'14r.I'-'tt x'f S..3.4K•e rye'h • S+.CF'''''' +_ •"w.. ,,,.i.' ._z_ __ .- —.— —
• ',`• .• `.•h '.^V,
.t f1Fl n MUM MU �vvzz��ZB®
o E - ..
•
., . ., _. .
m i
-L.
.....-
• ;,.'.',,,,-4,..- ',7 .7..- -_..
',*.4•1-.1'',' ' ' ' .... . ..
!:...t.',,i• ''''i'''.1.'•:. .
. ..•,.. ' ••., ..,
•:;e'''''4'''r' . '' ,
'-.4.." •",-:,••!',`,
• ..itl'iikyl• j•••••, L••••••*;,'Z,
-,...-;:. :-•'.,,''
''‘, .'•
p. •.• .ibe.v..:••••,.2••,r .•.-
s '•• ""•"4-44•••• • "4-f •••• . ;''.
:.5r.,:,;;•';.1!):'•,i-.•;;f1-.",,,,-,-.•
.2 - 4•04::- ':••.,,,,.•,•'.,•..,',4,:.
. ..4.4.5 Tea.?
...,'.;?'-'••-''."rr''i, Y5..24."4 f•'
%; "•::•-";3 ''.. ",nr r•.'K'.,A•'.•••4•"4..i4
'4'•.''''r".".4 "k "••,'.:"•••-•'''.,''''.._
? , - •-... .- 1 • ,t4i4"r'r ' -1' r.:11,,‘SiI;A:Ae,'
.'-'',IV.':•";.:"--;,.144`-` "''.1.••-tilA,'..'f',..••••":•et'6„;"..'' • ' •;",--•-.,, :,:4• Al.."(...•..•i• • ,?...•• L'.'4..5-Pr,'.:- 42, '''' :4,--.4;."''.e.,-• -: ,,vz,,,
i;........,,. - .v.% ,•-:: ;:-....47••7,1- ......
QUITCLAIM Eft: t • ' T • ‘,::-•':...:
'.•,- ,
, ,.
t-A::*•'-i•; .r. .. .
••
1•
4''- ''''1••,.:; '.• __..- -
4.....e.„. •... t '4 .,
-—t--
s
Grantor. SI:MARd B. alitru. not ar an individual but solely as Trustee:'I.I''.--4.•''',I...,1i" ' .1- ' : . 't.r.4""---*'7.-tr••' " ,
of the rroperty of CHICAGO. MILWAUKEE. ST. PAUL AND iikcir:L RAILROAD JI,A",..; . ,.
',.. 4: ' tv
. ,
8
. , .
. COMPANY. Debtor. being in possession of all the assets and pro;.erty of said i
-'es441vr'•, 64 4
1 Railroad Company under authority at the United States District Court for I
4 -‘•et',...,,,,, ,
let - .."-1•`' :, •
. .
41•44..;...''''• '
' .M -
•
,•-i.. ...,,,,, ••••_ zg• , 1
• i,.,
*. • .-''
the Northern District of Illinois, Eastern _iv slot, socket No. 77 B 8999
• ...
cc
i' . , a
• : -,. .."...•mm. .
......4f."7,: ..
!: T In proceedings under Section 77 of the Ban1ruptcv Act and pursuant to Order :. 1 No. 221 of said Court entered October 1. 1479. for and In consideration of i: .14"; - 'at-": ,•
.. 7'.,"!...4"'a.-1;Y:7-'•
- S
"m ''''':•'''' .•.. , ,,i'. 1 . ...
. .. ,. . 1:
I.the sum of r)uR HUNDRED SIXTY TH-REE THOUSAND ONE HUNDRED AND NO/100 DOLLARS . ;f• . •. • 1 . ,-- •
(S463,100.001. the receipt and sufficiency whereof are hereby acknowledged, : i • • •,`,...7-.'" .; ,.
. . i
.'',,,,,i,•••1 ..'" . „ -r . r , ','.•
,does hereby CONVEY and QUITCLAIM. tree from the liens of said Railroad 1
i e
•
. . .:. .1
IN :Company's first Mortgage and General Mortgage, each dated as of Zanuary 1. . :•• tr'''"4'- ', ••••- 4
"-1.." er -.1..../.'r* -' • :- _ 7'
1944, and all mortgages supplementary thereto, and from all other liens and •
.: - ' • C_,"..". •4 ""•*; • '
_.• ,•!..:-.:',_ : ',4 - 0 1
"...:
le.•'• '•-,..fl'•'•'!",r:':'• 1 I:T.1 claims as provided in said Order No.221. unto JOIN R. Kamm. INC., •
4.it ;.‘t....i*-4::;::!.... ,•::: • ' r. . ,-, 'Washington corporation. Grantee. subject to any and all esceptiotw and
,,,i ;"ir•':',:::c. . ' ,
A li reservations hereinafter set forth, approximately 46.31 acres of real
• : --•••';' •••'''''' '"'••••;,•;... ..' - '
lt-'., 3: •- . '''* '.: ) 1, .. ...
•
estate situated and being in King County, Washington, as described on
. • _,:Exhibit A attached hereto and m.de a part herioof. .
;i _ _,. '7 - .
Reserving
unto the Grantor, his successors or assigns, the following •- •• • '. '
:141'''• '''''
's i easements over the-seal estate herein described on Exhibit At ' N'' • '. -"-. ....,-'..,....- - . • . -
. . .
1. Am assignable easement for railroad purposes on a strip of ... . , 7!,' '".4-).•.:•,... ? 5• t
-43 .•'` •-'2,•• • ' ,
land containing 3.06 acres as described on ExhIbIt'B attached hereto and . .
3
1.'" ',,1::';',..:: ••• •... I,
made a part hereof. Grantee say construct one or more industry tracks 4 se • -
•
'-'s" - 1•••'ri , ... 4", ..
across said easement to serve adjoining land. If Grantor, his successors •."••Z •••';' '-••'•••; .•li- . ' " •••4•,:' • • .• •ii-0, ,:,;,' •1 .'i
4 ...1!..1: or assigns gives notice In writing of his intention to use said easement
within two years (too the date of this deed. Grantor his succensors or '.(''''',';"-'-,i• •.,.. • ... ,.'„,,... .
.
..
' assigns will pay the then fair market value for the land described in said ,
-% •4'.''- ".:.'...-, ' '4''..‘,..-•-:.,-":, 7- • .\ :
II
..,'."''', ,-',.::: '.4,,„'- •', -.,:,-..-.'144',r ..', ''.' '' '; -%,.-, fi •
4 4..Exhibit B. This right for purchase of an easeeent vill expire if not
i'• : .t
it
.
IIIexercised with two years from the &as of this deed.
...,. ,.:.--7, t
.11e-, --, . • , , ' ':"...---,. „I'•:. 1 t' .
II
,..-•:',;Q:.,-;,:=.1.A,':-',.• ''' ''''''. .... .....
'141f:',;%;...: -'..1. -' •''
- 1 -
.. ..
..„....,.....; ..: •
• =
. ..,..,;. :. . . .. ..:. ..,.•-•.,..••,.....,,,,,,,,,,,:-•.:,.;.;:=,.:,,,,,-4....,,,,,,,...,g.,:%;_,,,,,44,,:„-,..„:,,,,..;„,.4..„,,. .,...,,,,,..,..-„,...„,-.'.„.•,:i:-.....:,‘'-,,,:"F:,:::,-, ,::.,,,;-.41.",',,-,--,'",:',. -•, ..., . -, •'-'
C. . ...;' ',,-.,, -...- ,-...,",•,•`.`,1:i- -.7.-J-:i-'4,5-4 g-Z,*•t.;;JTV$1%,71'..:',.:7,7fr',:---V-4:61-4,'"'iPX, IF74.-j"-Ik''''''''''''' - - ' ' - ... • ...• '
-. -:--:4,'..,•-•-..',4,-2-,'-r!.";'.4 il,=,-,-...\,,,s;,-‘,,te---,, ,13.015*.s`lfr. ,",--,...7":..,;Y::A.,,:n:!. ..,-- 3',..:__' -..4:,44,2R,QA , f -,
- • ..-4,•;',,-.:!.4,4,-,,-.,-,Ti:;,.,',-„,?,::.:""Yc44,3 1,•': ,--i,.2,- . -',,,,-.!tzti,,-.7tx.,:s:.;-,-,_, ,...:-.. -,--4,3, , :,:',-1- ,:. ..,,,I.or,0,•: ,- y.,,5,„„.,,V,;?1.,,W,;:;:.: . ,'`„4 , ......:, ,
1.11 4 '.." 4-'1/405t.r..!....i.'1•••• "..'•••N• ''''''''.;,:-"•:.I.,-4.-A•Ca''''','"-".'.•!'''2.':'-''' ' ' - . ..' • ‘:" ;2X.-‘14
.,',-,.:•,.:.:,,L. ;4.T.'"-,'''.,,'•''..;,_-;i;„.',--:,,'r 1..-`5,-: ""'.,'..,,, ,I,r, ,:-''-'4`x,;3 ,, ,,,,,,'•,,,,,,,, -;,,,t;,....r4-,,E..i,34.,, vt--''-',:-A!!‘'.,1 'r":;.11,`,74t,r1:-:;•..!••.: AT i ,• ',,-,:.„..", '_ . F.. -_,,6•:! i//11/4 -- ••.:L.41.,.4,1,--"-r•.;,.....%,',.1 -'''''..' - ' 1 -,.. .174,7 -‘„„ . ..,. : , ,. . _:.r.,' '..: ;,..1„il'••„:„=:•i.:A,-1,-:";•a`fA.:::,-:„.:r ;:••....,.....
\ :" .c '':; ''!'ll'''' '. '': 7.. t .*:4'..,''' ^4"' ' r, ,4..., ; .• , ' .244:4Varc'',1i4L 'r ',e5'.'::..;1 '• 4fik '''.-4". 2.v-
',",•:', ,-.t.'f'; :0‘-..,!,.,4'1.,-.,..• . -,':
, . ..
ik.',:..T•; '
• .
.�.,'t YAP • } ' , "'4'5
i .. f -._ .
? 4�,,•e,, N, ,. , A !0 foot ride pert•wm nt ea-•-.ant for _se, nrintenanee and renewal,
,{t with right of access, of Grantor's communication line as it now exists across • f N -, :, i-
s r
;rf f ,•�.•t ; ': 8 real estate described on Exhibit A. If, at some future date. Grantee, his ,, w,+"2
. 7.
v #
N successors or assigns, desires to relocate said communication line. he rill _ Y''•� , f;
'r do so at his expense, and If said communication line Is relocated on real ,' ''`,�t p. '' t t
x w 4 - 'S
�t .' y,` estate described on Exhibit A, Instead of on adjoining railroad right of woe, S b^ A-'' 1 s
' t
.y,Y
L°W�y' X:f tl.cn Ca•antee, his successors or assigns, will grant a permanent 10 foot wide I + .,12 _:
„ a
$ 5�j.• ,,; easement for the new location.
• 4.., . t
lif'' "12 ' This conveyance is subject to all easements of right of way, whether or _ • -
a p%, 4 c not of record, and to all other encumbrances, exceptions and reservations of u C"
record, and the Grantor reserves to himself mineral rights, but without the -' .:
•
„el, _, y ,,. ;;,-, '+ right of surface entry. `* t .};
• This deed is given in fulfillment of that certain Real Estate Contract
,; .•i '>`,,. .yam 'i ` • :- •�' •
i - `1 ?.-•.`.. } • dated February 1.. 1960 and recorded under Auditor's File Number 80Ct170257, -
�,: %+ {-• ' records of King County. Washington, between the parties hereto, and condi- "e .-.0 _
... .."' s + i'+' tinned for the conveyance of the above described property. - ' • - r
£%(-tbl_. % ' -.1 c-$C'7-7Z_ a T '.
Pam' .
•
•
•
I.. t
wr 9 ,rj,=,ci:-c t V'� • ,
�-ri.,. ;,t _ 4.-1.i+{ .' .Y r, . a M f r �{ �j. ,3-4, AA��'++,r''„ , .. , ' 4tqil
�F )' r L '''''. "i M ... y• •1•,,-- —�.,i`.7W 7..•,ti -'{,, • ,4• a .sty
a , aye -R, ,,t.,,;.. ,y «k.4 'iGx ..... ,a'?th.4,$.,t; - , " ,
•
w
nrY
• J •
,;1
.. . ' .
.-illivet,
. il:lrii::-'-'
clicago, Milwaukee, St. Paul & Pacific Railroad
si N •egal DeacriPtioa of Property To Be fold. • •
.Z F ,'?' l-- That portion of the southeast 4 ; Nr",e'; `
;1 N quarter and the southwest i ,
'•k".' quarter of Section 13, Township 23 Borth, Range 4 East,
.,`* — V. M, and that portion of the southwest quarter of Section }
— le. Township 33 North, Range 5 tut U. M. all in fig ✓• +.'
county,Washington described se follows: }_.
-'i Seginning at the south Quarter corner of said Section 12; d+�`t <-.
+ Thence M 00•Se42C• E along the North-South centerline of e II
-
. :Li, ,..,..,
t * - r said Section 13 • distance of 684.84 feet to the southeast y .R. r corner of Tract 26 of Renton Shorelands Second Supplemental
*tick Maps, 1,5e. and the true point of beginning; `
,7 Thence S 72037452• m along the south boundary of said Tract .. .,eSV,w•rt� g#. r 4':ti 26 a distance of 382.60 feet; , n,
+ '* • -.• i
• a Thence V 70•54402• V also; the south •
., ,, , 426 • distance o! 72.51 feet to the ens of the Charles * 4
t • t Brownell Donation Land Claim Ste. 41; _� ,. a�
Thence M 01024406• E along said east line •distance e! � �,.Fa
550.se feet to a line 35 feet southerly e! and parallel -
'E`
- - - - - with the centerline of the wasting moat eoetherl track---- + `
of the Chicago, Milwaukee, St. Paul a Pacific Railroad -— 4
tracks; nor'. y
1 Theses along said lino 1$ feet southerly of end parallel r ' •' f
with the centerline of the most southerly track, along • i
curve to the • It right, the center of which bans E is°22•S2 `_�` •
,✓�F r: having a radius of 2,7f0.1f lest en arc distance of 6Sf.2a
•4 s feet through a central angle of 12022.14* to a pert of .
eo•pouart curve;
• ,t `;",_:. • right,' -- -- Thence along a curve to the rt�, along said parallel line, k"
the canter e! which bears E 0166041!• E having a radius of
ykr+z-ice { t 1,102.46 fest, an arc distance of 807.11 feet thrones a
• central angle of 41056e46•; - .4
• ti,, oil •" ' Thence a ee•S2.32• E. along - ..f
, said parallel line, adistance v. . i Y
of 167.07 feet; • Ct. i c, f
s Y Thence along • curve to the tight, along cold parallel lies ' L 4
T= �#-.
6.., t0
•
r. .,,,,..,,,,t, L ...:.._ . tr EXHiari-A . . , . ,
,.
,,... ..... ,, p„, .r,.. . . . ,t,.
, Its, ..t..: . _ ..,....,
•
.,,...-:-....,-., -.,,, i,- .,,......,._, ,
,, „,. ., ,.,... .,,. . . . _ , , r„.. - — -
c,,.........:,;.-.. •41.t. . ,.„,._. , .
_ __. • ...., ,__ „,... _ , • ......„„1 .......,_„..t.,. ....,,...;4. ......,::_.„.,„..fr,,;0;-'-'-.•*-'7,:r< 4'0',..... ., 47. .,,',•-•''''', ,' ..-1.
t ' � ' yy r .'r "'�a �.ter zir --
• • i' K.. Y :7 / r+l;„' 1 . t . X S:ySg =� r f R m`�1 «� (' �p i ai + � zyk . d � raI . , ..:`.` Y..J' e�` 'i��i�t�G'4Lri ; .7 .: ,. .� tr !yc. WrS,{:' �'.6''^'v-r.••;,i•1y;.. 4.5,,`v`,ti3f L _
••• ,.7k'n.'� z � o" r .. � tiM _,, L .v ^ ••' Z .� y?-�',�.. . r � '4V`ds L, 'Tct,4 vfi `-0• 7 -,- 4,• : : ro- ' i- - ? f
/ f
,
.
' a
•: f,t '.
,,, jet'•
{
;'+f", Legal description cont.d ,I. 4
Page 2 .
2
". + O having • radius of 1,829.78 feet, an arc distance of 309.67
;4 feet through a central angle od 09•41•48•; ' f 4T�
-' .}. �
l 43 Thence leaving sold parallel line, i 40.11•44• t a distance 4 s - t , • of 126.24 feet to a point on the mouth line of the Burlington "; F
f.
5 t northern Railroad Right of Vey; :,
x
` Thence along • curve to the left, along said south line, the ' x
•, center of which bar■ N 49.48•16. 6 having • radius of
1,005.37 feet, an arc distance of 549.02 feet through • i
1 Y,
`
central angle of 31•17•19• to • point of tangent o said 7 ter.
• south line of the Burlington Northern Railroad Right of Way;
y+" - Thence continuing .` ,
ng along said south line, I 71.29•03• I along r " '"g• ?'
.wig,:, F a line 50 feet mouth of and parallel with the existing' 1 ,.-, ;
southbound track • distance of 826.56 feet to the west line 3 ' :.,,
Mi ,� , p of said Section Is:
Thence continuingalong . , � ;, `said south line i 71 29 03• 8 •distance of 85.52 feet to the north line of the mouth 650 feet of the southwest quarter of the southwest quarter of
Y said Section le; :R
+ " ? Thence N 65•10•2s• r%1 .. •
feat of u!Q sout west the of north line of the south iof t i i,+.
'.:
v quarter fe the southwest line of of i
s section le • distance of •1.57 teat co she ease linen o! *he
southeast quarter of Said section 13;
Thence N ee•15•00• r along the north line of the south 650'* 4_ -•s feet of the southeast quarter of said Section 13 a distance
L : ; (% t. of 2261.41 feet to an angle point on the south boundary of r• b*.
Tract 25 of Renton Shore '*^
t.M �� +^ lands, rase; }
k -T•
ct3 Thence N 33.07.25• V along said south boundary • distance ,
of 154.53 feet to en angle Nuts Po ,
5r Thence N 27.21•32• I al ` , i .•;�; ong Said south boundary • distance
4 «tt of 387.32 feet to an angle point; ,
"�} ;t' Thence N 83•17•25• r alongc . r h said south boundary a distance d;
a 0'r M of 171.17 feet;
r° x Thence a 46.22422• Y along said south boundary a distance • ...
'.. ii of 324.66 feat; •;i -
y{
'. .L _ l
Thence s 72.37•52• Y along maid south boundary a distance ▪t
er of 76.33 feet to the true
&�4,, point of beginning. ; g
2
t rye{, •- rid' .
'� �`fi L+ ti ram s i
fig` EXHIBIT-A . . -. .:..:
• +-:: P: .4.4•, - `i ;�. •� �"•. •ra a. ,
- ' � V ' '� �d � � :.T;r` ?'a'' .. . f : va,Ai:',i ' ."<� _^ • ;,-�t •JQ_ 1t":%i;?r31at�: .'4 t rra%?�. c�k�. .�.b :.5r ..+;'�Yt-ti, •li: ,,�,' r -i! .� ' l y .. ppr� cri SaY'4,,k-, + , 4`ir, -,,9'?i, 0-exr ' 1 t� , - ?;`; aa e Sa• i stt :.
,.s-,y " t g4-' 4 -E ,7;t"4 'LI' ,fV I,^a, i . `* •,,,;�'-4,-,l ..:,.k� . , ; -,,• . aELJr:.,.- rt ' .,•,.. ,,--yrs;. r, :. s � , �T r• `„.- , *r :� xx i ' s4
t� ;., {Y= 0'• '.-t1 `t • _c_* I,a t t.� T 4 '� 4..r'i y*'� •'�`h L �• ,k�
4.4R' . . ! .. .... ... - M•i 5
1 .a-i AT f:iiii { r. t
' fi�.r� i
• '.- /
, , N i
44 4 ,
°' Legal PeocriPtion of the 65' 6akvecnt. yI
That portion of the southwest quarter of Section 13 and the '`. +` ', _
' p southeast quarter of Section 13 all in Township 23 North. 11 +c ; ,t, N
_ _ Range 4 East, W. N. in Ring County, Washington described es I . _ ,d O
follows • ,•s•r, C
F " + (V
fi;i Beginning at the south quarter corner of sold Section 13; o
.0,
' ,• ' Thence N Oo•58'2a• C along the north.south centerline of '• �° S
j„ ; naid Section 13 a distance of 1327.26 feat to the southeast k t
• t corner of Government Lot 7 of said Section 13; . h
,r. Thence N 87.38'53• W along the south line of said oov.rn..nt , -
v Lot 7 • distance of •29.05 feet to the vet line of the - �, 7
• i Charles Brownell Donation Land Clots Me. al; o
' Thence N 01.24,01• N alongsaid east lime a distance of • '• . �' 2 a
saf''i 232.32 feet to a lino 100 feet southerly.f and parallel u �t"> • £ p
° ' with the centerline of the eatlati* waft Soutltwsly trail ""
-• of the Chicago, Milwaukee, St. Paul and Pacific Railroad �'� !
4. tracks.;and the true poles of beginning; ti w
,��tf� Thence along said lino 100 feet southerly of and parallel ,` a
'A , --- with thu centerline of the Roost southerly track, along a - - — - - '' e
curve to the right, the center of whirrs bears $ 1s•d7•1!• M
i having a radius of 2,725.1! feet an arc distance of 513.50 . !
feet through a central angle of Ls•si'ss' to a point of Al
Ti e
compound curve; -- - -
' Thence alonga curve to the right. along �Fr !
gh ` said parallel 1!•0. •
the center of which bears S 01 30 1e• M bsvleg a radius of • `
J , 1,037.44 feet, an are distance of 759.52 feet; 2. .! c
Thence 1 49•53'I2• N, along said parallel line, a distance ~, ""11 !
- of 1a7.07 f.st; " h
: f
'r Thence along a curve to the right, along said parallel line a t'
,e� having • radius of 1 7Gd.7a fest an arc distance of 2111.67 •
7� iti r . •- '-f• !
feet through a central angle of bs•N•!0•; <,
" c Thence leaving said parallel line, S 51•11,17• it • distance e
of 701.e3 feet to a point on the south line of the $urlingtoo ' `
F. t
• •-, Northern Railroad Right of Way;
• s:
..
Sp, ExIornT..•B i., ... ,. ,-r 7.'',. , , .Ff1s t .t
,-+.. F.. 'c.sy �,Ky Yt�s"S Ake As-,-,c try lrt-r -. ,tie , ,• dS,�J ,•tree
. - J 1 4 �L c}KSY.} -., t 'f'' ,,,•„ - R •.r;, .F r . .�! !`_l..�,- ----•• }�i p ,. +TR...'ri.'�.�:.•• ' -�.
y.. t ;, is w,• % �5';. *y0 wry 9 : �� o 1 i
F ,
.0
r ya M '�' , '.w r rj.`v .• p a • — >c L'• o N
,
A` � r'+�'"� �_ 7; " 1 �4 t' • � 4''s",`�x .ct"'� riC +�a-i^�Fa.. 4 ..s.'Stt -"•:�.r.. 9• .... 'e� _. .. '" i•
/
A o',0,-.•:-.44,-,., •• f;,,..r,....,.'',.,.,-,,.•.:
-
t
r
::,
D +�5u w.4 Fey4' ,..., •
, ..
•rat riq,t
ler"
t i
* i"•. ., N Legal Description of the 650 Laseeont. continued :,�r �4
i OD
e p
it '. Thence northwesterly along1 •','�'` 4 m Y said .oath line along a curve
to the right, the center of which bears R 35.24.23. a - ' • , $
i , " having • radius of 1,005.37 feet, an arc diotance of 01r" .
r 212.64 feet through a central angle of 1e°23.53.;
'1.'.4rf* '' Thence leaving said south line, d 40°11444. M ■ distance
' F".i of 126.24 feat to a point on • line 15 feet southerly of
r : and parallel with the centerline of the existing most
• r 'motherly trade of the Chicago, Milwaukee. it. Paul sad 1 7::
f
• " Pacific Railroad tracks;
• i
r ` ;- Thence along said line K feet southerl of and parallel -
with the centerline of the neat southerly track, along - - -- - }
- --- a curve to.the left hafts;a radius of 1,023.70 feet -
•
:,yii.
an 09•el arc distance of 301.67 feet through • central angle
,, Thence R 49•53•72• W. along said parallel Ilse, a distance `
'� of 167.07 feet; , , ::::42:
.
Thence along a curve to-the left, along said parallel lie•
o having • radius of 1,102.46 last an arc distance of 007.11 ; 3 1
VP s ?:. feetcentral angle o! al'56.K` to a gist •! ',r curve:compound -:
Thence along a carve to the left, along said parallel lima :E.;a� having a radius of 2,700.1! feet an arc dista�es et SSf.01 "s r ., • s 1
i of the Cfeet harles 0rowns11 Don• central natisn or iLLand,Clete Me. 4114' to the •ast 1!M ,� > > •
4#
e . Thence I 01•21'04. ■ along said east line a distance of 6.
67.97 feet to the true point of beginning. `fir
Y
i j 140.4 ,:. . __. ,-).. Zgal • t 0
i ..
•
EXHIBIT. �} µF
y.
tt0(4.: -.•-•,... , -
i 4 1' 4 .1}} .
"'� '.IS'— .�i_^, »�C.` :•f T-1'•'✓;t:�F;: c.'w''�i �7': 'r;F%�,. '?7= } `' .' '' �.,,�.'-.
r 2_ „ _ �.�.Z. '=:-4„ :• +:_ipj ail��. 'z': i t •,,-;' ' ..
'.(.... '4.:�\�Y;.....AV!:e ,r77,:.•R"�{ �r 4``,.x"40;.''{-'rX-}4.?,:N:10:7Z1.2Y''x^: T 4... Kars'., x{"r.... , � ci•v�4•t,1'`;''.:., ....L i� -r!�` - P,�• 7t �c
j,di
x`: - - - ., - t .c,."14.,,,, `,:i c¢ °y,r i,�.�'' �xr h� "h�. ihls's.1 ';P''4:_,',- _.-q
414\
'�{ �"' s '^h..r t u y 4- * : . h . k .1 yr # d ri- �4h ems. i "., Y, = ,.r
IMP
Ss' + °°.3i" ± i# �� 'ter
1Y ,iM. �F �1 Nt:....r ia1-'k4 r. . ..i. , r r.. i t"�"
FINAL
ENVIRONMENTAL
IMPACT STATEMENT
BLACK RIVER OFFICE PARK
APRIL 1982
♦ e�►
ru
CITY OF RENTON
FINAL
ENVIRONMENTAL IMPACT STATEMENT •
FOR
BLACK RIVER OFFICE PARK
PREPARED FOR THE
CITY OF RENTON
-PLANNING DEPARTMENT •
RENTON, WASHINGTOW
BY
R. W. THORPE AND ASSOCIATES
Prepared in Compliance with:
The State Environmental Policy Act of 1971
Chapter 43.21C, Revised Code of Washington, as amended
SEPA Guidelines, Effective January 16, 1976
Chapter 197-10, Washington Administrative Code, as revised
L-I
TABLE OF CONTENTS Page number
INTRODUCTION ii
DISTRIBUTION LIST iv'
LOCATION MAP vi
VICINITY MAP .. . vii
CONCEPTUAL SITE PLAN viii
PREFACE ix
SUMMARY x
COMMENT LETTERS
Written Comments from Governmental Agencies and
Response to Comments
1. United States Department of the Army 1
2. United States Department of Agriculture,
Soil Conservation Service 7
3. United States Department of the Interior 12
4. Washington State Department of Ecology 15
5. Washington State Department of Fisheries 17
6. Washington State Department of Game 21
7. Washington State Department of Transportation 24
8. Municipality of Metropolitan Seattle 31.
9. Puget Sound Air Pollution Control Agency 34
10.. King County Department of Planning and
Community Development 36
11. City of Renton Fire Marshall . . 48
12. City of Renton Police Department 50
Written Comments from Neighborhood Residents, Community Groups
and other Interested Private Parties and Responses to Comments
1. Seattle Audubon Society 54
2. . Green River Study Group 58
3. Alhadeff, Leavitt, Wesley & Bopp 61
4. Lauri Johnsen 65
Letters Not Requiring Response
1. Washington State Office of Archaeology and
Historic Preservation 70
2. Seattle/King County Department of Public Health 71
3. Seattle/King County Commuter Pool 26
4. City of Seattle Department of Construction
and Land Use 72
APPENDICES
A. Black River Office Park Water Quality Impact Assessment
B. Black River Office Park Rezone Traffic Analysis
C. Correspondence from the Renton Public Works Director
D. Black River Office Park Drainage Analysis Supplement
-i-
•
INTRODUCTION
Project Sponsor
Alterra Corporation
2120-A S.W. 152nd Street
P.O. Box 66101 .
Seattle, WA 98116
Nature of the Proposal
• The proponent is requesting a rezone of 71.16 acres from General
Classification (G) to Manufacturing Park (MP) in order to con-
struct in two phases an office park and rail-served warehouse uses.
Project Location
The site of the proposed rezone is a 71.16 acre parcel of land
located approximately one mile west of the Renton central business
district. The site is bounded on the north.by the Burlington-North-
ern Railroad right-of-way, on the east by the proposed Earlington
Woods Planned Unit Development_, on the south by. the Earlington Golf
Course (proposed to be developed. into an industrial park) and on the
west by Monster- Road and the P-I pumping station.
Lead•Agency
City of Renton Planning Department
Responsible Official
David Clemens, Acting Planning Director
Planning Department
City of Renton
Contact Person .
David Clemens, Acting Planning Director
City of Renton Planning Department
Municipal Building
200 Mill Avenue South
Renton, WA 98055
Tel: (206) 235-2551
Date of Issue of Draft EIS: April 24, 1981
Date of Issue of Final EIS: April 22, 1982
Cost of the Document: $ 5.00
i ',
-ii-
Authors and Principal Contributors
This EIS was prepared under the direction of the City of Renton
Planning Department; research and analyses were provided by the
following firms:
R. W. Thorpe & Associates Entranco Engineers •
815 Seattle Tower. Hydrology
3rd & University 1515-116th Avenue N.E.
Seattle, WA 98101 • Bellevue, WA 98004
(206) 624-6239 (Contact: David Morency)
(Contact: Deborah Krouse)
Rittenhouse-Zeman & Associates, Inc.
Geotechnical Engineering
13837 N.E. 8th Street
Bellevue, WA 98005
(Contact: Craig LaVielle)
The TRANSPO Group
Traffic and Circulation
23-148th Avenue S.E.
Bellevue, WA 98007
(Contact: David Markley)
Present Actions, Permits and Licenses Required
Rezone
This EIS involves a request for a rezone only. If and when specific
development plans are proposed in the future, the following permits
may be required as well as additional individual supplemental environ-
ment analysis pursuant to WAC 197-10-660.
Street Use Permits
Preliminary Plat Approval Electrical Permits
Shoreline Management Substantial Occupancy Permits
Development Permit Sign Permits
Flood Control Permit Fisheries Permits •
Final Plat Approval All other permits necessary
Site Plan Approval to construct the buildings
Grading Permit and improvements proposed on
Hydraulics Permit the site.
Building Permits
Mechanical Permit
I _
Location of EIS Background Data
R. W. Thorpe & Associates Renton Planning Department
815 Seattle Tower City of Renton
3rd & University Municipal Building
Seattle, WA 98101 200 Mill Avenue South
Renton, WA 98005
-iii-
RECIPIENTS OF THIS FINAL. ENVIRONMENTAL IMPACT STATEMENT
Federal
Environmental Protection Agency
. Department of Housing and Urban Development
Department of Energy .
Army Corps of Engineers, Seattle District
Soils Conservation Service, Department of. Agriculture
Department of Interior, Fish and Wildlife
State
Governor's Office
Office of Program Planning and Fiscal Management
Department of Ecology
Department of Fisheries
Department of Game
Department of Transportation
Department of Social and Health Services
Ecological Commission
Office of Archaeology and Historic Preservation
Office of Public Archaeology, University of Washington
Regional
Metro- Water Quality Division
Metro- Transit
Puget Sound Air Pollution Control Agency
Puget. Sound Council of Governments
• Seattle - King County Department of Public Health.
Local Government
King County Department of Public Works, Hydraulics Division
King County Building and Land Development Division
• King County Planning and Community Development Division
King. County Soil and Water Conservation District
City of Kent Department of Community Development
City of Tukwila Department of Community Development
City of Seattle Department of Construction and Land Use
City of Renton
Mayor
City Council
Hearing Examiner's Office
Planning Commission
Public Works Department
Parks and Recreation Department
Police Department
Fire Department
City Attorney
SEPA Information Center
Planning Department
-iv-
RECIPIENTS, continued.
Utilities/Services
Renton School District #403
Puget Sound Power and Light Company
Washington Natural Gas Company
Pacific Northwest Bell
Libraries
Renton Public Library
University of Washington Library, College of Architecture and
Urban Planning
King County Public Library
Newspapers
Seattle Times
Seattle Post-Intelligencer
Daily Journal of Commerce
Renton Record Chronicle
Private Organizations and Others
Seattle Audubon Society
Greater Seattle Chamber of Commerce
Rainier Audubon Society
East Lake Washington Audubon Society
Green River Study Group
Alhadeff, Leavitt, Wesley and Bopp
Lauri Johnsen
Muckleshoot Tribal Chairman
Duwamish Indian Tribe
-v-
•
a sit j�.;:'F �1i3.��: .c z•:.., ":7,s3,,,, 'MS ^;-:`'.
AA M Y ,
(000.„ .."
Plitk` , I
°s` F pppp BELLEV.UE�, j,.
v•
. `�, „r tarn'<;s ?€a';M y x ,.„ "- A r TL ■ �;1✓ LAKE
ti -`>,,r�% "` / AMMAMISH
yp ��m� .Z' ...i
.4,..,,,if: z.,,,,,pqx,,,,,,
a,,, b
k
,,�� *...4,.
site.
rs 405 RENTON
' s ' UKWILA
g
t3„r, LAKE_
, 4j 17' YOUNGS
MAPLE .
�� VALLEY_
. .4 ''S't KENT._ 1�0
tee. �i } s�'" �.•F'"A `.,•,T�'" ,• I`
g
aYe ".
, �off a ad . .,x F [ a' , �it, •
Tilt.fh BLACK kco- � N AUBURN_ DIAMOND yo..y, 9* . q
y" ViK=„...„',Attt,-..
yr, , , FIFE
. ; ' TA OMA
1 LOCATION MAP
BLACK RIVER
• OFFICE PARK
•
NORTH .. R. W. THORPE & ASSOCIATES
v`i
t•
'.'a,,::;:���,•�;�'..4 t.-::-:�;i `gct' ;;lt-'-,?:':;Sniff tryl I I' •.[-5�,• 41, f '11-\.�- (" C�� CV• inillYE
::_,,,.2.
•
• ,,
..._.,.,_•__,
,. kg___(_.
';,17r�.•: '03 "!'.� .f ±� 'iii!':i' 'i o•`ag_ 'rt Im, f4 1� 9e'�,-1 f--—�ie"�-a__'_�TL's1• _ •'"�.,;� a • E w rc I
jk' !y't. }:1111' l}:•.:�:� , Y ki _I!•i^.) //� 'Y�L'--1 Rat•♦ ��11. Rnw� �_ .C'\ wJI� "
> 4 0
:'i 1 Y�_- JJJ INC:::� Ir
!---:'-' ,-=,-;-t',-'--Az' ,,,'L� . '- _•:iy �n 1!. nr,2..Ws...= - / ;--- 7 N
r''a _f;'; l-�+ n S¢� '{,,.Yrx 7 :�-t`;��.;.,.•,,; .;,' 0. :c9J i{ \1 • .,,,�""��'' _�lfs `.,._ �' r "•.'..'
•
ni y
7„f''XI„s ....,..:41,A\,,,srIrr-'llits41,',3.•:-.,=';A' -;-•.:'•`•:5.--,,9J-.1,..-p \,,,,..,91,1' =-...\, -:,)s,,—,- -
--"•ki;.$)T-,:i.:-<\-. ° r ?^.t.' ', .t _- /' s�1_�_;,;3^;•;_i� .,r.ama.':s-- e :'�':a•r.+..x.,.v r .. .t.'" _- _----_:_ /��
�rF, '?f•:x,w '' a ,`i '-�",''; 'r� t-_H Vo:t.` .t .. .,a;._..,:. •..,.:--u'<:.a,-.+cY._._. _ _ -- - ii
1/4
\,,A,`,?,;I:•.•.1•.-\L.•"•V.L..t
AIC(.IMlLi.i l
:T' nj' kg''" 3 �ti7t - 'q,r%ZY'�-�t ! 1 \ F3 `•b ;' R. T f`, I Q
-R•ii::i ti:::a 2 \ii? 7 ':!..":4•1,i.•lv
•c.Cv,./ 'p •' "-•'fib:LE ; ••
•
.J..-• 4
4 :'+.!•::t H''4!ti x•':V.r ::.Fy , Y►L'„:T;' 7: _____ p_ _ ___ __ ry
,,.,.?t/I-/.,.''..,,.Ii-
•1_r--_7.1r_gl;______.*,e\1\.,\i\‘•".\t,E,y\,:a,,1,*...•••:.,
"\,.'t 1 g-,....-.:•45...%•
\4_: ''1..• }tt�.• /gg-'_ .. Yf:^T..fFY�•_;rri a !)/ _. _. l4_ -- _ —__.._ - "'1 \ r,.L.
. '� :;:1;: . • gyp" T"-�.. ^' r� Z -- 14 kf \ --
:2,}a:_ t:. ;.,,�...•r,. ' tfji;- , ;car:c•r
1 r:
Q
0 EC•
1 4-,....:4,-....--;k4.:;••:;;: ••.1N.••••:,:\:.411.1.1.i ')ii I r.7.7..':';`)m?.:..1!?7631:731 lt, \ 1 .n i .
l
r >^ t 'i ,':• . r' -::' {_ 1 to
is < "g :: 9
M
•
�s,'''''-..--,.,-,:? . ..f..,-,''.....',,,r,%i...,.;-•• �, •fit _�� -°�a`` .•/ %�;:'fir;_ ; :::., Z :..-17.74:::,..7::::_i:
. ..wR
F / : /
•i
�,{,t.t�• ; ,rt)�t• Y J '1 ,,rrii, y ". (7 LL /I
m rop '� ►A• /T U t� U I \1
. :::�/r •:��.1 „,I. .1 tr((T ' Yt*f � Grp ,�`', 7, 0 t(to (13 I t I
4\':t� }:\1t \)'
`t'' R, .a" 1, ., t l; f - ---- ..- --f r_ W .
'1 • I /i "i ,�1‘7,07 - �� m Jf 0 to
.1,,...-;„---_,,,, ___ C‘k•*--/i ,-. ___ ---- :::,..-7_„17,..,E,A r-,-1,„ a . --j _ -
•
o
A.
\� T/r°,. CS)k` .. fit` ��-! •JJ•
Irtkilt • i1 (I, . -,s m ti !' _._ _ /, ," • %Tit, DUI
a
cr6.1; . \'''. d... -1,; .:4 bi,.,,. t ,t-Lk
N ib',/ -.7-,A,..14v "',;., I 1 .--,-",-* \\
C'1 '6 e''';':(1.„,. ('-`,47-r''!)*;'''P -1?;.))1\ I' i -'1 zr' ''' /(?) )
"'� �`. .,•, tt�er- f �,{{--..,,r r'"•�,.t,°�i[, x% / :-,c).L.,,, `fo�'. '�G% r` A1� [!L=� .-s".1 I �°'1 _rnI'r.a,,, \ ; `z,-:E,.�•%/ rt'fr.'< ,, •,,; � .E' '.,;.,r /� � oa /� t=.. \ c.:= ---f4 11_ 9'f `�`^a •;�`~:;-r_2��,r%•�J�'s%t'k%c�'�� I � \\. ' ���4/r�1�1 1•-1 "��1`lZ �-----"J �� Q
r .,
,,,
BLACK
RIVER
OFFICE PARK
PHASE 38 PHASE 1 33Acres R.VIL THORPE AND ASSOCIATES
•
r7_____--7---77--- _ _ nil
�_ 'a`4ft, 0," ,::. -,,eil- °a ,°e` fti 800 NORTH
4° N. ° E aOftsOo v� �O. •.o�
��a� 4?" i K. O 00 00 0 �, • ,
4 p. e, w� °� 0,441
.� s,;,
.,49epr le , ,, O 1 Oal.y4. eOA�[1� 0',, f0.
14,0 , o 0o. F.3e.edeb a .t,,s ,/J1.)6 a 4: `0o,
.0.•P s e.^ IS ill •0.44 O aad�� 1' OHO OSO O I 60 ,.. �M�R
N- �:+oO�i Opo Osoo�d�0-0
ee// 1,.i!raW.0IPOp a Oe40.e.° '.41.° a::'...).4 q? ap�ctiVadegia..,, w .
a Ov /i \
�;,sisceIng err _AMA �. N jay!: :��, �lW. � ��� Pi• ' �I ELOP NT
u —
I _ - P.1 'M y V �� () Q, / „,1[_ I IO
..„.......„
NORTH
M \ \r />"--2-'
aC
mr .
fa
om -
ar
mD .
mZ
PREFACE
This document, together with the Draft Environmental Impact
Statement issued July 10, 1981, is the Final EIS for the
proposed Black River Office Park Rezone.
The Draft EIS is not reprinted herein.
This EIS has been prepared pursuant to WAC 197-10-580(2) .
ix
I '
SUMMARY
OF TIE •PROPOSAL
r
- I. The Proposed Action
The project sponsor proposes to rezone a 71.16 acre site from General
Classification (G) to Manufacturing Park (MP) designation in order to
construct, in 2 phases, an office park and rail served warehousing.
Future environmental consequences of specific on-site development will
be addressed in more detail in future environmental documents.
Off-site improvements may be required to serve this proposal , or this
proposal in conjunction with other developments anticipated in the
future in this area.. These include improvements to the P-1 drainage
channel (see other Governmental Services, p. 86 . of the DEIS) ,. and con-
struction of the Valley Parkway.
II. Impacts and Mitigating Measures
A. PHYSICAL ENVIRONMENT
1... Earth
a. Geology and Soils
Impacts
Import of fill and reposition and cover of topsoils due to
excavation and filling activities.
Mitigating Measures
Excavation and grading operations on the site will be performed in
•
conformance with the City of Renton Mining, Excavation and Grading
• Ordinance
b. Topography
Impacts
Topography will be modified in order to create buildings and road
sites.
Mitigating Measures
Topographic changes could be restricted to limited areas of the
site.
c. Unique Physical . Features
Impacts
Development of the proposal will necessitate removal of 38.6 acres
of the 59.5 acre riparian forest located on the site.
Mitigating Measures
- Existing vegetation will be preserved on significant portions
of the site.
- A master landscape plan will be prepared to ensure good design
practice and preservation of as much of the riparian vegetation
as possible.
- As many of the existing trees as possible should be retained -,
through maintenance of greenbelt areas in order that large
groups of trees and understory remain undisturbed.
- The Black River Channel will be protected by a 50 to 100 foot
setback from the top of- the bank.
2. Air
Impacts
There will be a short-term increase in dust and fumes during
construction. Over the long-term, automobile-related pollutants
will increase as local traffic levels increase.
Mitigating Measures
- Low emission construction equipment will be used whenever
possible.
- Measures to control construction dust, such as watering,
cleaning and sweeping of streets at the end of hauling
activities should be performed by the contractor.
3. Water
a. Surface Water Quantity/Quality
Impacts
Increased surface runoff from the site as well as increased levels -
of polluted surface runoff would result from the proposed action.
Alteration of runoff characteristics will occur in that diversion
of stormflow into ditches and storm pipes will prevent water from
flowing to low lying areas and may cause some drying up of wetlands
that will be preserved on site, unless storm drainage measures are
undertaken to protect them.
-xi-
•
Mitigating Measures
- Temporary detention and settling ponds should be utilized
during construction of foundations to collect silt and minimize
turbidity.
- Stormwater runoff will be collected in a storm sewer system
approved by the Renton Public Works Department.
- Oil/water separators should be utilized to remove petroleum
products from storm water.
• - Adequate street and parking area cleaning and maintenance of
the stormwater system should be provided.
- Catch basins and screens should be included in the stormwater
system to collect litter and debris.
- No development will occur within a 50 foot setback from the top
of the bank of the Black River Channel .
b. Floods
Impacts •
Fill material will be utilized to bring . building sites above the .
100 year flood elevations.
Mitigating Measures
- Fill material will be required to bring some building sites
above the 100 year flood plain which will prevent on-site
flooding.
- Some areas could be left unfilled which may reduce the amounts
of flood storage displacement that occurs on the site.
c. Groundwater Quantity/Movement
Impacts
Project development would result in an increase of impervious
surface on the site, which would decrease the amount of
infiltration of precipitation.
Mitigating Measures
A reduction in building site coverage could require less filling.
-xii-
4. Flora
Impacts
Approximately 84% of the site consists of a unique wetland
deciduous forest, a part of the largest forest of this type in the
Seattle area. As a result of the proposed action about 78io of this
riparian forest would be removed and be replaced by building
foundations, roads and parking areas.
Mitigating Measures
- As many of the existing trees as possible should be retained
through maintenance of green belt areas in order that large
groups of trees and understory remain undisturbed.
- A master landscape plan will be prepared to assure good design
practice and preservation of as much of the riparian vegetation
as possible.
- Placement of building sites, parking lots and roads should be
based on tree inventories provided by field surveys.
- Vegetation along the Black River Channel should be preserved
and maintained by the proponent.
5. Fauna
Impacts
Removal of most wildlife habitat and reduction in most native
wildlife due to intrusion of human activity.
Mitigating Measures
- Landscaping materials that provide food sources for birds and
small animals should be utilized.
- As much natural vegetation should be retained as possible.
- Surface water quality along Black River should be
preserved by planting natural riparian vegetation along the
drainage-way banks and maintaining wetlands wherever possible.
•
-xiii-
6. Noise
Impacts (Short-Term)
Noise levels will increase considerably during construction
activities with frequent noise peaks depending on the type of
equipment used: Traffic noise will increase on adjacent streets.
Mitigating Measures
- Noisy operations should be scheduled so that they are not
concurrent.
- Phased development should be planned which would reduce the
size of movements of construction noise.
- Construction equipment should be operated only between the
hours of 7:00a.m. and 7:00p.m. Monday through Friday.
- Only construction equipment that does not exceed State of
, Washington maximum environmental noise standards should be used.
- Construction equipment should be placed as far away from
sensitive noise receptors as possible.
- Construction activity should be scheduled so that all truck
traffic does not occur concurrently in order to avoid vehicle
congestion.
Impacts (Long-Term)
Increase in traffic and train movements will result in a
proportionate increase in noise levels. Increases in noise levels
due to human activity at the site will occur.
Mitigating Measures
- Landscaping, careful site design and berming should be utilized
near main roads to deflect noise and reduce its impact.
- See "Vehicular Transportation Generated - Mitigating Measures,"
p• 81 of the DEIS.
- Installation of rubberized railroad crossings where the access
road would intersect the railroad spurs to the south of the
site would decrease noise generation.
-xiv-
•
7. Light and Glare
Impacts
Addition of low level lighting on the site. The traffic generated
by the site will increase the incidence of headlight glare. Some •
glare will be produced by reflections from windows and possibly the
buildings themselves.
Mitigating Measures
- Building wash lighting should not be used.
- Perimeter landscaping, fencing and berming, especially around
parking areas and road entrances could reduce light spillage.
- Parking area lighting could be directed so that no direct light
spills off the site.
8. Land Use
Impacts
Change in the land use from old growth riparian forest and open space
to office park with warehousing.
Mitigating Measures
An. alternative development design with limited building area could
retain significant areas of the site in open space.
9. Natural Resources
Impacts
Removal of most of the existing vegetation and open space on the
site. Consumption of some natural resources for construction and
maintenace of the project.
Mitigating Measures
Building elements could be analyzed for use of techniques, wherever
possible, permitting recovery of materials used in construction.
10. Risk of Explosion or Hazardous Emission -
Impacts
There will be a slight risk of hazardous emission or explosion
during construction and potentially from future tenants.
-xv-
Mitigating Measures
None.
B. HUMAN ENVIRONMENT
1. Population and Housing
Impacts
A slight increase in local housing demand may result due to
employees desiring to relocate near .their work. Also, day time
population levels 'at the site will increase to about approximately
4,100 permanent employees. •
2. Employment
Impacts
Increased short-term employment during construction and long-term
employment. once the development is complete.
Mitigating Measures
None.
• 3. Transportation/Circulation
Impacts
The proposed Black River Office Park is anticipated to generate be—
tween 9,070 and 34,030 vehicles per day and between 1,250 and 3,970
vehicles during the evening peak hour. This additional volume will
exacerbate the existing congestion at most of the intersections
along major arterials.
Mitigating Measures'
a) To reduce potential safety hazard, Monster Road should be
upgraded to accommodate heavy trucks and increased traffic
volumes. This may involve recharmel i 7ntion and possible
sig al;zation of the Sunset Boulevard/Monster Road inter-
section.
. -xvi-
b) To discourage the use of single occupant vehicles, the City
may consider limiting the number of required parking spaces
to less than is currently prescribed by the zoning code.
c) The road proposed to be constructed along the west edge of
Earlington Park, to the south of the site, could be extended
in such a way to provide westerly access from the Black River
Office Park, in order to reduce traffic volumes that flow
through Earlington Park.
d) Establish a new bus route or modify an existing bus route to
pass through the project.
e) If bus service is modified to be convenient, provide bus
passes as a company or office park benefit.
f) Office park management should advise tenants and their
employees of the advantages of fleet ride, vanpool and car-
pool programs through a package of information provided at
initial occupancy for each tenant and coordinated through the
Seattle-King County Commuter Pool agency. Office park manage-
ment should also schedule public information meetings for
employers and employees.
g) As much as practical, office park management should encourage
employers to initiate a flextime work schedule so peak period
traffic can be distributed more evenly over the 3:30 to 5:30
p.m. peak period.
h) Any roadwork on-site could be conditioned to allow open at all
times a portion of the road wide enough to permit emergency
vehicle access.
i) Grade an alignment from was Avenue S.W. which would intersect
the road system on-site with a gravel sub base wide enough to
allow emergency vehicle access.
j) Disruption of traffic flail in the internal road system could be
minimized by installing utilities, within the right-of-way, but
outside the roadway proper.
-xvii-
4. Public Services
a. Fire Service
Impacts
Over the short-term, construction activity may increase the
hazards of fire fighting. Construction of the proposal would
significantly impact the fire protection responsibilities of
the Renton Fire Department. This development, coupled with
future development in the area, would necessitate improvements
to provide timely first response capabilities.
Mitigating Measures
- Sprinkler systems installed in buildings per City Code and
Fire Marshall 's requirements, will reduce the amount of fire
flow required.
- Non-combustible building materials would reduce risks of
fire.
▪ Industrial tenants could be limited to uses that do not
utilize flammable materials.
b. Police Service
Impacts
Demand for police protection will increase.
Mitigating Measures
- Tax revenues generated from the development will help offset
the cost of additional service..
-xviii-
- Internal security systems could be installed in the building.
- Exterior lighting should be placed at strategic locations to
provide additional security measures.
c. Hospital Facilities
Impacts
The proposed project is not expected to significantly affect
usage of the Valley General Hospital .
Mitigating Measures
On-site first aid facilities within major buildings should be
provided.
d. Parks and Recreation
Impacts
Development of the site will preclude any future development or
designation for park use.
Mitigating Measures
None.
e. Maintenance
Impacts
Increased demand for City maintenance of streets, water,
sanitary sewer and stormwater drainage systems.
Mitigating Measures
None.
5. Energy
Impacts
.Increase in demand for electrical power and natural gas and
possible increase in demand for energy associated with
transportation.
-xix-
Mitigating Measures
- Insulation in roof, walls, flooring and glass should be
utilized.
- Energy analysis of building design should be performed.
6. Communication
Impacts
Increase in demand for telephone service.
Mitigating Measures
- All telephone lines will be installed underground.
- Installation of telephone lines will be coordinated with
installation of electrical lines.
7. Public Utilities
Impacts
Existing water supply and system would experience some
additional demand. Deterioration of water quality entering the
combined sewer and storm drainage system is possible during
construction activities. In the long-term, the quantity of
water entering the system will increase due to increased
impervious surfaces on the site. Also, project development
would generate increased solid waste and sewage flows from the
site.
Mitigating Measures
Site runoff will be directed to the old Black River Channel
where it will receive wetland treatment prior to its discharge
into Springbrook Creek.
8. Human Health
Impacts
Increased noise levels due to construction, traffic and other
human activities may affect the health of nearby residents.
-xx-
Mitigating Measures
- Noisy operations should be scheduled so that they are not
concurrent.
- Phased development should be planned which would reduce the
size of movements of construction noise.
- Construction equipment should be operated only between the
hours of 7:00 a.m. and 7:00 p.m. Monday through Friday.
- Only construction equipment that does not exceed State of
Washington maximum environmental noise standards should be
used.
- Construction equipment should be placed as far away from
sensitive noise receptors as possible.
- Construction activity should be scheduled so that all truck
traffic does not occur concurrently in order to avoid
vehicle congestion. •
9. Aesthetics
Impacts •
Visual appearance of the site will be altered.
Mitigating Measures
Site design and retention of some existing vegetation will
soften the impacts of the bulk and mass of buildings.
10. Archaeological/Historical
Impacts
Project development may cover potentially archaeologically
significant portions of the site, specifically Duwamish Indian
sites. (Refer to the letter from the Office of Public
Archaeology in Appendix D of the DEIS.)
Mitigating Measures
The Office of Public Archaeology of the University of
Washington will conduct borings at 25 meter intervals in the
areas considered to have high archaeological potential and at
50 meter intervals at other undisturbed areas to confirm
specific locations prior to development of the site.
-xxi-
11. Economic Factors
Impacts
The project would create short-term construction employment.
The development would also partially ease the demand for
industrial building space. The City of Renton will receive an
increase in tax revenues and municipal costs generated from the
project.
Mitigating Measures
None.
III. Alternatives - Please refer to the comparative analysis in Table 10 on
page 111a.
Alternative 1 - Development of 75% of the site with 25% in concentrated
open space.
•
This alternative is slightly greater in density than the proposed action,
but the site plan would be so designed to allow 25% of the site to remain
in concentrated open space. This open space would most likely manifest
as' a greenbelt of varying width along the old Black River Channel and
Springbrook Creek located at the site' s southern perimeter.
Impacts
This alternative would retain approximately 25% of the site in its
natural state as a riparian forest. The impacts of this development
alternative would be slightly greater than the proposed action; however,
the difference in impacts is not readily quantifiable. It is expected
that this alternative would generate slightly greater impacts in the
following elements: soils, topography, erosion, air quality, runoff,
flora, fauna, noise, light and glare, natural resources, employment,
transportation/circulation, public services, aesthetics, and economic
factors. When definite site plans become available for review, specific
differences in impacts can be assessed.
-xxii-
Feasibility
According to the developer, this alternative is economically desirable
and feasible. However, the increased impacts caused by an increase in
density would reduce feasibility with respect to service from city and
public utilities, as well as diminish the acceptability of project
development in regard to the physical environment (soil , topography,
runoff patterns, flora, fauna, light and glare, noise levels and natural
resources.)
Alternative 2 - Development of 46% (33 acres) of the site with 38 acres
remaining in open space.
Description
This alternative differs from the proposal in that building would occur
on only Phase 1 of the property with the remaining 38 acres (the western
one-half of the site) preserved in open space reserve to mitigate the
development impacts.
Impacts
Overall , this alternative would place decreased demand on the physical
environment. Specifically, no development would take place in the
western portion of the site. This area would be preserved as open space
which would eliminate the impacts on soils, topography, runoff patterns,
flora, fauna, light and glare, noise levels and natural resources for
that areas Impacts to the physical environment in the developed areas
would be comparable to those of the proposed project.
Impacts to the human environment (public services, utilities, energy and
archaeological resources) would be similar to the proposed project.
However, impacts on such elements as transportation/circulation, air
quality, noise and employment would be diminished.
Feasibility
This alternative would reduce the amount of leasable building space by an
undetermined amount. There is a high demand for rail-served warehousing
which may not be tapped if the project were to exclude this use.
-xxiii-
Alternative 3 - No Development
Description
This alternative would leave the site in its undeveloped state on a
permanent basis or on a temporary basis until some other proposal for
development is approved by the City. However, pressure to develop would
continue due to Manufacturing Park designation on the Comprehensive Plan,
development of the surrounding properties and increasing demand for
industrial land development.
Impacts
All adverse environmental impacts of the project would be eliminated with
this alternative. The positive economic benefits of the project, such as
increased property taxes, creation of short- and long-term employment and
partial alleviation in demand for industrial land would also not occur.
The most significant impact of this alternative would be preservation of
the riparian forest which would extend the opportunity to the City to
purchase the site and preserve it as a green belt. No development would
shift the impacts of development to other sites which may be more or less
suited for these uses.
Feasibility
. The "no develoment" alternative would not meet the objectives of the
proponents. The feasibility of the City in acquiring the site for the
purpose of presesrvation is unlikely due to the market value of property
and the City's Comprehensive Plan designation of the site for manu-
facturing park use. However, the City may require preservation of
substantial portions of the site due to the potentially adverse
environmental consequence of development.
IV. Unavoidable Adverse Environmental Impacts
I. The Physical Environment
A. Earth
1. Changes in the contours of the site, including excavation depths of a
maximum of 10 feet for utilities.
2. Addition of fill over native soils.
-xxiv-
• I
B. Air
1. Increased air pollution from automobile emissions.
2. Increased particulate levels due to construction activity and
additional traffic volumes.
3. Short-term odors during construction activities.
C. Water
1. Increased surface runoff from the site which may contain an increased
level of urban pollutants.
2. Potential alteration of ground water movement, quantity and quality on
it
the site.
D. Flora
About two-thirds of the natural riparian vegetation on the site would be
removed.
E. Fauna
1. A reduction in the ability of the site to serve as habitat for
wildlife.
2. Reduction in number and diversity of wildlife.
F. Noise
1. Increased noise levels over the short-term due to construction i
activity.
2. Increased noise levels over the long-term due to human activity and
increased traffic and rail volumes.
G. Light and Glare
Light and glare will be emitted from the site to surrounding properties.
-xxv-
H. Land Use
1. Loss of open space.
2. Preclusion of alternative land uses for the site during the life of
the project.
I. Natural Resources
1. Consumption of building materials and energy.
2. Conversion of open space to warehousing and commercial uses.
II. The Human Environment
A. Population and Housing
Very slight increase in population to the City.
B. Employment
None.
C. Transportation/Circulation
Traffic impacts will be increased as a result of project development.
D. Public Services and Utilities
Increased demand for all public utilities and public services.
Cumulatively, with other developments in the valley, utilities and
services will eventually need to be increased.
E. Aesthetics
Visual appearance of the site will be altered.
F. Archaeological/Historical
The potential removal of an archaeological site.
G. Economics
Unknown.
-xxvi-
DESCRIPTION OF THE PROPOSAL
I. Name of Proposal
Black River Office Park
II. Project Sponsor
Alterra Corporation
2120-A S.W. 152nd St.
P.O. Box 66101
Seattle, WA 98166
The proponents have requested a rezone of 71.16 acres from General
Classification (G) to Manufacturing Park (MP). The development, to be
completed in two phases, will contain rail-served warehouse and an
office park.
III. Project Location
The proposed project is to be located on a 71.16 acre site, approxi-
mately one mile west of the Renton central business district. The site
is bounded on the north by the Burlington Northern Railroad Right-of-
Way, on the east by the proposed Earlington Woods Planned Unit
Development, on the south by the proposed Earlington Industrial park, '
and on the west by Monster Road and the P-1 pumping station.
IV. Other Agencies Maintaining Files on the Proposal
None. •
V. Site Description
Roughly 11.5 acres of the 71.16 acre site have been cleared and about
59.5 acres consist of riparian forest. Approximately 5 acres of the
cleared portion of the site is presesntly used for dumping purposes for
a land fill . Access to the fill area is via a dirt road adjacent to
the railroad intersecting Monster Road. The remainder of the site is
heavily vegetated by a riparian forest. The site is generally level
except for those areas near the railroad tracks which have been filled.
-xxvii-
VI. Description of the Surrounding Area
The immediate vicinity of the project site is characterized by a com-
bination of rapidly developing industrial lands and undeveloped open space
with several residences to the east. The site is north of and contiguous
with the Earlington Golf Course; this acreage has been proposed for industrial
park. North of the site is the Burlington Northern railroad tracks. Across
the tracks from the site is a heavily wooded slope covering the south side of
Earlington Hill . To the west is the King County Black River Wastershed pump
station and Monster Road. To the east and northeast is the proposed Earlington
Woods Planned Unit Development,
VII. Major Physical and Engineering Aspects of the Proposal
• Definite site plans have not been determined. However, tentative land
use percentages are as follows:
Site Coverage
Use Acreage Percentage
Warehouse, 12.09 . 17%
Office 35.58 50% •
Roads 2.85 4%
Total Developed 50.52 71%
Open Space 20.64 29%
(Approximately 35% of the riparian forest would remain
upon development.)
Also, the proponent intends to impose development restrictions,
including the following:
1. The minimum tract size for any development shall be 2 acres.
2. Maximum land coverage by building shall be 40 percent.
3. Maximum site coverage by impervious surfaces shall be 70 percent.
4. Each developed site shall retain a minimum of 20 percent of the
is
natural vegetation in a contiguous pattern.
5. An architectural control committee shall approve all structures in
order to ensure that the design is complementary to the existing
environment in the area.
-xxviii-
II .
II
yf .
II - WRITTEN COMMENTS FROM GOVERNMENTAL AGENCIES
II' AND RESPONSES TO COMMENTS
-It •
III .
ill
r17:" ' ''' .
.11
I1
741, .
II .
1
71.
fl, .
71
Ti
ali
1
•
� � id�, DEPARTMENT OF THE ARMY
a�/.;- � /• /-\2, SEATTLE DISTRICT. CORPS OF ENGINEERS
W ,�:71 r ' ly P.O. BOX C-3755
G`� �II 41'14"s;*,..)
SEATTLE. WASHINGTON 98124
3r4res cs�
NPSEN-PL-ER 2 n " " 1981
David R. Clemens, Acting Planning Director
Environmental Review Committee
City of Renton
200 Mill Avenue South
Renton, Washington 98055
Dear Mr. Clemens:
We have reviewed the draft environmental impact statement for the Black
River Office Park Rezone, Renton, Washington, with respect to the U.S. Army
Corps of Engineers' areas of responsibility for flood control, navigation,
and regulatory functions. Our comments are attached as inclosure 1.
Thank you for the opportunity to review this statement. If you have any
questions, please contact Dr. Steven F. Dice, .telephone (206) 764-3624, of
my staff.
Sincerely,
.47 04,,k... (....,'
• /01," g
1 Inc1 SION6 KNUTSON, P.E.
As stated 1 .Wet Engineefing pitied
Copies furnished:
See attached page
x(CrF
7: RECEIVED 0
,.\
1 (,)
JUN 1 1981
I ..1\1.s,,,,,,..,...........•■••=.................1.0.110 till,
4A,G DEPP�/
1
1
1
—i.—
NPSEN-PL-ER
David R. Clemens, Acting Planning Director
Copies furnished w/incl:
Mr. William Cokely
Soil Conservation Service
232 Main Street South
Renton, Washington 98055
Mr. Donovan Tracy
King County Division of Planning
King County Courthouse, Room W217
516 Third Avenue
Seattle, Washington 98104
Richard Houghton, Acting Director
Public Works
City of Renton .
200 Mill Avenue South
Renton, Washington 98055
Honorable Barbara Y. Shinpoch
Mayor of Renton
Renton, Washington 98055
Dave Clemens, Acting Director
Planning Department
200 Mill Avenue South
Renton, Washington 98055
ii
2
•
•
NPSEN-PL-ER 20 May 1981
COMMENTS: Draft Environmental Impact Statement (EIS) , Black River Office
Park Rezone, Renton, Washington
1. Under Section 404 of the Clean Water Act, a Department of the Army
permit is required for the discharge of dredged or fill material into L
the Black River west of the dam and pumping stations near Fort Dent
Park, as well as for any fill in wetlands associated with the western-
most reach of the Black River.
2. Page 3, paragraph b, Floods. The majority of the proposed site is
classified as a Broadleaf Swamp, with a smaller portion on the northwest 2
border classified as Shrub Swamp, according to classification criteria
developed by the U.S. Fish and Wildlife Service (FWS) in their National
Wetland Inventory. Both classifications provide valuable benefits for
storm water retention, wildlife habitat, and water filtration/purifica-
tion. Filling or alteration of these areas may also require concurrence
on the project from the FWS, as well as a Section 404 permit from the 3
Corps of Engineers.
3. Detailed analyses are required to evaluate impacts on flooding from
deletion of existing storage areas and acceleration of runoff to assure
that flooding will not be aggravated.
4. Page 55, paragraph 3A, second paragraph, and page 88, paragraph 4F,
last paragraph. The proposed development would have little adverse
effect on runoff if the proposed Soil Conservation Service (SCS) East
Side Watershed Project is completed. The SCS design has sufficient
hydraulic capacity to accommodate all the increase in runoff related to
the development described in the EIS. The Black River pumping plant has
sufficient capacity with or without completion of the channel improve-
ments upstream of the pump plant. However, since conveyance to the pump
plant is insufficient without cha.no.el improvements, loss of storage r 4
spa'-e by landfill would force water presently stored in the proposed
office park area to other areas.
5. The EIS clearly (and correctly) states that "project development
will result in increased surface runoff and simultaneous reduction in
flood storage capacity of the site which will contribute to flooding
conditions. . ." (page 98). However, it does not provide enough
detailed information or data to adequately assess the impacts from this
increase in surface runoff, decrease in flood storage, and the contribu-
tion to flooding.
a. There is no quantitative data to indicate the magnitude of
increase in runoff, decrease in flood storage, or the type and magnitude
of change in flooding proolems resr.1`ing from the proposed project.
., •ti / -3 •
-
b. More specifically, there is no quantitative data on the impacts
of this project on the SCS.'s Eastside Watershed Project. Will it impact
the feasibility or flexibility of the SCS project? SCS's project should
be listed on page 19, "The Relationship of Proposal to Existing Laws,
Policies, and Plans."
c. There is no discussion of what will be done about the proposed
project's "contribution to flooding conditions" until the construction
of SCS's P-1 channel and detention pond are completed (see page 98).
The proposed Black River project will contribute to the flooding problem
and there is no guarantee of when, if ever, the Eastside SCS project
will be constructed. Further analysis is needed on the impacts of the
project on flooding in the absence of the SCS project. The EIS should
indicate alternatives available, if any, to the valley cities in con-
taining additional rates of storm water runoff. If studies indicate
that the expected increases in runoff rates and volumes cannot be pro-
vided �'•
for, the EIS should then point out anticipated impacts to the
natural environment as well as to plans for valley flood reduction
measures now proposed by the Corps of Engineers, King County, and other
valley cities.
d. The EIS does not discuss the combined impacts and/or cumulative
effects of the proposed Black River Office Park project and the Earling-
ton Woods Planned Unit Development (PUD), located east of the proposed
project site, with regard to increased surface runoff, changing drainage
patterns, etc. The Earlington Woods PUD is being constructed, and run-
off from the site is and will be routed through the Black River Office
Park site and into Springbrook Creek which drains the wetlands at the
proposed site (page 54). .a
e. The EIS states that storm water runoff will receive "wetland
treatment." First, this term needs to be defined. Second, since the 5
proposed project will increase surface runoff and decrease the wetlands,
will the remaining wetlands be adequate for "wetland treatment" of the
runoff?
6. Generally, the EIS lacks detailed information. It is difficult to
assess the impacts of the project on flood plain management objectives,
water quality, the need for a 404 permit, the SCS project, and induced
flooding (these last two are of interest and indirectly related to the
Corps' Green River Flood Damage Reduction Study).
-4-
Response to Comments from the Seattle District Corps of Engineers
Comment Number: 1
The applicant has discussed with representatives of the Corps of
Engineers the applicability of the Section 404 permit to potential
development on the subject site. The Corps of Engineers indicated that
a previous decision regarding waterways upstream from the P-1 Pump Plant
could possibly exempt the site from the requirements of the 404 permit.
This matter will be reviewed in. full at such future. time when building
permits are sought in association with a specific development proposal.
Comment Number: 2
To incorporate the information provided in the comment letter from the
Seattle District Corps of Engineers, the following sentence is hereby
added to the discussion of "Surface Water Quantity/Quality - Existing
Conditions," on page 54 of the Draft EIS:
- "These. swamps provide valuable benefits for
storm water retention, wildlife habitat,
and water filtration/purification."
• Comment Number: 3
Please refer to the response to comment 1, above.
Comment Number: . 4
The consulting firm of Entranco Engineers has conducted a drainage
analysis for the Black River Office Park which has been included as
Appendix D of this document. The report addresses in detail the
existing and future conditions of estimated flood elevations and the
rate and volume of local stormwater runoff generated on the project
site. Table 1 on page 6 of Appendix D summarizes the estimated
volume of runoff accumulation and corresponding flood stage ele-
vation both with and without the P-1 Channel and for present and
projected future levels of development as indicated in accordance
with existing land use plans.
-5-
I I
Comment Number: 5
•
Entranco Engineers has conducted a water quality impact analysis, the
results of which have been included in this document as Appendix A.
The details of the wetland treatment proposed for the Earlington Park
and Black River Office Park developments are discussed on page A-3
• of that report. Entranco Engineers has concluded that the old Black
River Channel has adequate storage ability "to provide a high degree
of water quality treatment for the combined stormwater runoff from
• existing and proposed projects in the vicinity." (page A77)
•
These water quality improvements can not be achieved with the imple-
mentation of the P-1 forebay since the forebay includes major portions
of the existing Black River Channel. However, the existing quality
of Springbrook Creek is only slightly better than anticipated runoff
quality, and it is unlikely post development runoff will result in any
measurable increase in pollutant concentrations in Springbrook Creek.
(See Water• Quality Impact Analysis by ENTRANCO Engineers, Appendix A,
page 7) .
Comment Number: 6
•
Please refer to the response to comment 4 , above.
-6-
•
m::;'. United States Soil,
Department of . Conservation Room 360 U. S. Courthouse
Agriculture Service . Spokane, Washington 99201
June 1, 1981 R
•
Mr. Dave Clemens 0-CE \
Acting Planning Director
City of Renton SUN 3 1981
200 Mill Avenue South �-o •�___,.._..�.---•�Z
Renton, Washington 98055 e �
Re: Black River Office Park--DEIS ',1/4/
Dear Mr. Clemens:
The Soil Conservation Service (SCS) has reviewed the Draft. EIS for Black River
Office Park and' has the following comments:
--The relationship of the proposed development to the current plans fcr the
East Side Green River Watershed Project should be discussed in greater
length than as on page 55. The site plan indicates that the area north �.
and northeast of the Black River pump plant will be developed. Green River•. •
Project Plans include this area as part of a holding pond (forebay) . We,
therefore, recommend that this area be excluded from development.
--0n page 61, the report; states that "vegetation along the Black River Channel
should be preserved and maintained by the proponent." It is important
that the width and length be stated, as'the forest is an important design 2.
feature of Green River's holding pond. The pond area will be designed to
provide habitat for wetland wildlife which will be enhanced by the "edge
effect" provided by the existing forest.
--Page 22, the development of. the : :parian forest would be a loss of a natural
resource which has scientific and educational value. This is not recognized. 15,6.
The forest is a rare, old growth riparian stand of mature trees similar to
the vegetation that once existed along the Green River in this area. In
addition the riparian forest is a unique visual resource, in that it has high .4.
visual resource quality. It provides the large mass of green relief needed
in the landscape and acts as a screen and landmark.
--The statement considers saving isolated trees to enhance the visual effect
of the development. Considering the species involved and their tolerance
to development, it is questionable whether the trees designated to be re-
tained
will survive. . Such development will severely interrupt the ecosystem
presently functioning in the riparian forest.
--On page 37, there is a list of cer- in basic factors and site conditions 1, 1(,.
desirable for industrial development. Some clarification is needed as to
drainage since the area is a wetland. It is also questionable as to the 1.
adequacy of the present road for high volume traffic.
•
•
O
The Soil Conservation Service SCS-AS-1
is an agency of the • 10-79
Department of Agriculture •
-7—
Dave Clemens - 2
The City of Renton's recent wetlands study report, which indicates the multi-
purpose uses of wetlands and the ranking of the riparian forest, should be ack-
nowledged. •
We suggest that consultation with the City of Renton continue to avoid conflicting}
9.
circumstances.
If you have any questions, please contact Charles McAfee, state resource conserva-
tionist, Spokane, at 456-3708.
Thank you for the opportunity to comment.
Sincerely,
6:142.;;Y (. /".-2777.4"`-1
I6l-NN A. BROWN
State Conservationist •
•
•
•
•
•
•
•
•
. Response to Comments from the U.S.D.A. Soil Conservation Service
Comment Number: 1
The East Side Wastershed Project is discussed in reasonable detail
on pages 86-88 of the Draft EIS, under "F. Other Governmental Ser-
vices." According to David Clemens of the Renton Planning Department,
the design for the placement of the P-1 Channel calls for a small
portion of the project site to be included in the forebay area, but
none of the forest is planned to be included. However, the proponent
of the Black River Office Park has indicated that he will revise the
site design as necessary to accommodate the placement of the P-1
improvements, once its. plans are finalized. See also the response to
comment 4, letter from the Seattle District Corps of Engineers, on
page 5 of this Final EIS.
Comment Number: 2 .
As illustrated on the conceptual site plan on page. viii of the Final EIS,
the vegetative setback from the southern property line would vary
from 50 feet to 150 feet and extend the. full length of the southern
property line,, .excluding the 'segments intersected by the access roads.
The southern property line is approxmiately 5800 feet long of which 1150
feet have previously been filled. The remaining 4,650 lineal feet is pre-
sently
forested.
Comment Number: 3
To incorporate the concerns of the Soil Conservation Service, the
following information is hereby included in the discussions of
"1.F. RESOURCE OBJECTIVE" (page 22) and "Parks and Recreation -
Impacts" (page 85) of the Draft EIS:
"The site, characterized by a rare, old growth
riparian stand of mature trees, exhibits scien-
tific and educational value which would be af-
fected upon project development.:'Development of
the property as proposed in Figure 3 would elim-
inate approximately 65% of this resource."
-9-
Comment Number: 4 •
The final sentence of the initial paragraph of the discussion of •
"Aesthetics - Existing Conditions" on page 94 of the Draft EIS is
hereby amended to read as follows:
"It serves as a visual relief from the sur-
rounding developed areas of the Valley."
The final sentence of the discussion of "Aesthetics - Impacts" on
page 95 of the Draft EIS is hereby amended to read as follows:
"Development of the property as illustrated
by Figure 3 will eliminate a portion of this
visual relief. (Approximately 65 percent of
the riparian forest is proposed to be removed) .
The perception of reduction in visual relief will
vary depending on vantage points."
Comment Number: 5
Comment noted. These impacts are acknowledged on page 61 of the
Draft EIS.
•
Comment Number: 6
The factors and site conditions considered desirable for industrial
'development listed on pages 37 and 39 of the Draft EIS were quoted
from the Renton Urban Area Comprehensive Plan. The discussion of
consistency of the proposed Black River Office Park with these guide- ' {
lines commences on page 40, where it is acknowledged that the proposal
site is characterized by poor drainage and that it will be necessary
to introduce fill material in order to bring some areas of the site
above the 100-year flood level. The proposal is also inconsistent with
several related objectives of the City's Comprehensive Plan as described
on pages 21 - 24 in the Draft EIS. i~
Comment Number: 7
The TRANSPO Group has conducted a general traffic analysis of the po-
tential impacts of the proposed rezone of the subject site, which has
been included in this document as Appendix B. On page 4 and 5 of that
report, the existing conditions as well as proposed mitigations for '
Monster Road are discussed.
-10-
Funding of the improvements outlined in the attached traffic analysis,
(Appendix B) , will be based on a proportional use formula. The costs
for road and intersection improvements should be allocated in propor-
tion to the traffic volumes generated by the proposal compared to the
total traffic volume using the section of road and/or intersection that
is improved. Thus, costs would be allocated in proportion to the bene-
fit received. Necessary transportation improvements will be consistent
with phasing of development.
The issue of how the City of Renton and/or other developers fund nec-
essary improvements, excluding those required of the development des-
cribed in this EIS, are beyond the scope of this EIS. An in depth traf-
fic.:operational study to define problem areas and offer measures of
mitigation will be done when a definite development proposal is submit-
ted for this site. See letter from City of Renton Public Work Director
Richard Houghton, last page of this EIS.
Comment Number: 8
On February 28, 1981, the City of Renton issued Wetlands Study: A
Reconnaissance Study of Selected Wetlands in the City of-Renton
which evaluates significant remaining wetlands in the City with the
intention to develop an overall policy for protection of wetland
functions. The study contains general policy recommendations as well
as specific recommendations for preserving certain wetlands. The
• Black River Riparian Forest, contained within the subject site, was
ranked by the study as the most important wetland in the study area,
thereby warrenting all reasonable measures to permanently'protect it.
According to David Clemens of the Renton Planning Department, the study .
has been accepted as a technical document and is awaiting review by
the Planning Commission. . It has not been adopted as policy by the
City Council.
Comment Number: 9
Comments noted.
-11-
United States Department of the Interior
_ 1 FISH AND WILDLIFE SERVICE
Ecological Services
2625 Parkmont Lane, S.W. , Bldg. B-3
Olympia, WA 98502 pF „
May 28, 1981 �`� ��\�
David Clemens, Acting Planning Director MAY 29
198
City of Renton Planning Department
Municipal Building
200 Mill Avenue South ;;.4•
Renton, Washington 98055 ��D�Pfr
Dear Mr. Clemens:
We have reviewed the draft EIS for the Black River Office Park Rezone
and are opposed to the proposed action. The Fish and Wildlife Service
has repeatedly emphasized the wildlife values of the Black River Riparian
Forest in our review of various proposed projects (e.g. the SCS East
Side Green River Project) . Its value is also mentioned in the EIS
itself, as well as in your own City of Renton Wetlands Study: "This
forested wetland in (sic) considered the most valuable wetland within
the City. It is large, fairly isolated, has high overall wildlife
diversity, high wildlife and waterfowl potential , and an extremely
unique vegetational character composed of a complex of old growth
riparian species. It provides high value open space and aesthetic
qualities. The interaction with Springbrook Creek and the P-1 channel
detention basin increases its wildlife habitat value (p. 11 )."
Although we have not made a detailed study of the area, wildlife charac-
teristic to this type of habitat include: mink, long-tailed weasel ,
river otter, raccoon, screech owl , great horned owl , red-tailed hawk,
. grouse, swallows, belted kingfisher, land great blue heron. These
animals and the forest itself can provide a valuable recreational and
educational resource for your community. These urban wildlife areas are
increasing in importance as both general public appreciation and recrea- L
tional travel costs rise. Accordingly, we do not believe a decision to
enact the proposed rezone would be defensible from a public interest
perspective.
We appreciate the very real difficulties faced by a city in acquiring
such lands, but we firmly believe such long-term protection is as vital
to the public interest as a viable business community. The uniqueness 2.
of this area may make its acquisition of interest to the Nature Conservancy.
Additionally, it is our understanding that the area is under priority
consideration for acquisition under King County's proposed Park and Open
-12-
•
Space Bond Program. King County presently has a landscape architect
preparing conceptual development plans for including the forest in a 2.
recreation system linking Fort Dent Park and other areas along P-1
Channel and the Green River.
Obviously, the final decision is up to the city and will reflect your
underlying goals and objectives for, presumably, a balance between
economic development and resource protection that will result in the
quality of life desired by your constituents. We urge you to give our
comments your serious consideration.
Yours sincerely,
SorICharles A. Dunn
Field Supervisor
•
•
-13-
Response to Comments from the United States Department of the Interior
Comment Number: 1
Comments reflecting opposition to the proposed rezone are noted. Any
future zoning or other land use decisions must balance the benefits
and detriments of development of the subject site. The proponent must
clearly support the proposals consistency with appropriate public plans
and policies, and show that the proposal is timely. If any of these is-
sues are unresolved, the plan as proposed could be modified, rejected
or deferred until sufficient certainty is achieved.
Comment Number: 2
According to Jeanette Veasey of the King County Parks Planning Department,
the King County Parks and Open Space General Obligation Bond Proposal is
tentatively scheduled to be placed on the ballot in the Fall of 1982.
The General Obligation Bond proposed is recommended in a report devel-
oped by a citizen committee entitled "Pro-Parks." However, Ms. Veasey
indicated that the riparian forest on the site is not included in the
acreage to be considered for acquisition.
•
-14-
•
•
;t IN5!'I I l,`:1Ai'� DONALD W.MOOS
Director
5!: ii:: v,SI-iUNC,lONE
DE),AR `MLN ( ECOLOGY
• M'iia Stop I'V-i 1 a ayirpiv, '✓ ,Ishinrton 98504 ,, (206)753-2800
May 21, 1981
•
•
•
Mr. David Clemens •
Acting Planning Director
City of Renton . • •
Municipal Building '
200 Mill Avenue South
Renton, Washington 98055 •
Dear Mr. Clemens:
Thank you for the opportunity to review and comment on the draft
environmental impact statement (EIS) , Black River Office Park.
Department staff at our Headquarters and Northwest Regional Office
(NWRO) have reviewed the document and have the following comment.
•
Renton Sewage Treatment Plant is currently operating at or
above capacity and occasionally violates National Pollutant
Discharge Elimination System permit limits. It may be
several years before the plant is upgraded. The sewer
service for additional sewage flow may not be available
until the treatment plant is expanded.
If you have any questions, please contact Mr. Mike Dawda (885-1900)
at our Northwest Regional Office, 4350 - 150th Avenue N.E. , Redmond,
WA 98052.
• Sincerely,
�L'6�t.: .jt,CJ-Cc}C.
Debbie Fristoe
Environmental Review Section
DF:me
cc: Mr. Mike Dawda
•
•
•
Response to Comments from the Washington State Department of. Ecology
Comment Number: 1
The EIs is concerned primarily with the request for rezone, however, it
attempts to anticipate potential impacts to elements of the environment
that construction of an office/industrial park may have. If treatment
capacity at the Renton Plant is insufficient,--a--moratorium on sewer
service is possible at the time of a specific development proposal,
however, insufficient capacity may also be a factor in the city's review
of the rezone and its decision as to whether the rezone is "timely"or not.
-16-
\,. ril)1LAI\iLI I I N
(.Governor D:rec:Jr
i I tF:;l/S INIC i(.;N
DEPA'-1 iviEN`,! C.)F FIST-IER ES
Building J 1.)0 ;pia, Washington 98504 W (20 )7S3 buid) •(SC'\N)_3-;-!4,(A)
May 28, 1981
7..OF R4�,
RECEIVE!
• City of Renton Planning Departmen,.
Municipal Building. (1( MAY 291981
200 Mill Avenue South
Renton, Washington 98055
• Attention David Clemens N/ !
�GDEp�'¢
Gentlemen: •
•
Draft EIS - Black River Office Park
Sponsored by Alterra Corporation
The Department of Fisheries' staff have reviewed the above referenced
. Environmental Impact Statement and have the following concerns.
Reference is made several times in the EIS that a 50-foot setback from the
top of the bank of the Black River channel will be maintained. The EIS
also indicates that the majority of the site is wetland and will require fill .
For the purpose of measuring the 50-foot setback, what is considered to be �.
the top of the bank? What would be the physical dimensions and configuration
of the riparian zone?
The EIS indicates that oil/water separators could remove most pollutants from
the stormwater runoff. Apparently the applicant or the City of Renton is
designing an improved, system. This is encouraging from the standpoint that 2.
most of the systems currently in use are inadequate to maintain desired water
quality. We would be interested in reviewing the updated designs for
oil/water separator .systems.
It is also planned to route stormwater runoff from the site to the Black River
Channel where it will receive wetland treatment prior to discharge into
Springbrook Creek. However, one of the unavoidable adverse impacts will be
an increase in urban pollutant levels in the runoff. What will be the effects
of these pollutants upon the wet:and? Will the character of the wetland be 3
altered, thus further eliminating what is described in the Draft EIS as,
• . . a 70-acre climax riparian hardwood ecosystem, the last remaining example
in the lower Green River Valley" (page 49)?
•
The statement on page 63 should be corrected. . Chum salmon are an important 4.
species in the Green River system, however, they do not migrate into the J
Springbrook system.
City of Renton -2- May 28, 1981
It would also be helpful to show how this project will relate to the current
plans being developed by the Soil Conservation Service for the flood storage } g.
area upstream of the P-1 pump plant.
A Hydraulic Project Approval issued by the Washington Department of Fisheries
and the Washington Department of Game will be required prior to the start t,
of any work activity within the , rdinary high flow line of Springbrook Creek,
the Black River, or their tributaries.
Thank you for the opportunity to comment.
Sincerely,
/ 411 -(Ze4(.4d.c.--' .
Rolland A. Schmitten,
Director
{
-10-
•
Response to Comments from the Washington State Department of Fisheries
Comment Number: 1
•
The minimum 50-foot setback from the Black River Channel depicted on
the conceptual site plan on page viii of the Final EIS, was calculated
from the southern property line of the site. The applicant, as well
as Other owners of property abutting the proposed P-I Channel improve-
ments, are continuing to negotiate with the King County Hydraulics and
Soil Conservation District in considering their design criteria in re-
lation to proposed development for adjacent properties. In this respect,
the precise location of the preserved riparian zone has yet to be finalized.
In order to assure a minimum natural setback of 50 •feet the final land use
design should calculate this setback from the future P-1 forebay property
line. It should be noted that the 50 foot setback is the proponent's de-
sign proposal. Specific dimensions approved by the city in the land use
approval process may be more or less than this dimension. ,
Comment Number: 2 '
As discussed on page A-3 of Appendix A, entitled Water Quality Impact
Assessment by Entranco Engineers, the use of oil/water separators, in
conjunction with the proposed wetland treatment, and gabion structures,
as well as frequent street cleaning, should result in sufficient water
quality treatment so that no significant degradation to Springbrook
, Creek would occur. Installation and maintenance costs of the storm •
water system which treats On-site storm water will be borne by the pro-
ponent.
Comment Number: 3
Development of the property as currently proposed would eliminate approx-
- imately 77 percent of the riparian forest. Entranco Engineers has ana-
lyzed the influence of. the combined surface water runoff from Earlington
Woods PUD, Earlington Park and the proposed Black River Office Park on the
proposed wetland treatment of the old Black River Channel. The results of
analysis have been included in this document as Appendix A. As stated on
page A-5 of that report, ". . . the treatment available in the old Black
- River is sufficient to remove more than 70 percent of pollutants." result-
-19-
ing a higher quality of runoff than presently exists in Springbrook
Creek. However, implementation of the P-1 Forebay would eliminate the
Black River Channel's ability to filter out pollutants since the forebay
includes major portions of the existing Black River Channel. (See the
Water Quality Analysis, Appendix A, page 7 of the Draft EIS.)
Comment Number: 4
The discussion of "Fauna - Existing Conditions," on page 63 of the Draft
EIS is hereby revised as follows:
"A Washington State Department of Fisheries report
indicates that Springbrook Creek is one of the im-
portant tributaries supporting runs of Coho salmon.
However, Chum salmon do not migrate into Springbrook
Creek."
Comment Number: 5
A graphic depiction of the proximity of the subject site to the
current design of the SCS forebay area is shown on the site plan on
page viii of this document. This forebay area would require about
Without the P-1 system, implementation of the proposal would increase
flood storage elevations by up to .3 feet. In addition, included as
Appendix D of this document is a Drainage Analysis conducted by Entranco
Engineers, which examines the estimated flood elevations with and without
the P-1 Channel project for both present and future levels of development.
This information is summarized on Table 1, page 6 of Appendix D.
'Comment 'Nuntbet: 6
Please refer to thee.response to comment 4, letter from the Army Corps
of Engineers, on page 5 of this document.
-20-
Stara
`gyXrtIp.
m.
" � FRANK LOCKARD
JOHN SPELLMANDi
a rya
Governor 91 IAM7!• mct«
STATE OF WASHINGTON
DEPARTMENT OF GAME
600 North Capitol Way,GI-11 • Olympia, Washington 98504 • (206)753-5700
June 8, 1981 1--
r ,
t• 12 1981
aL
Mr. David Clemens _- .__------�"
City of Renton
Municipal Building ; /'✓,•:..��A�
200 Mill Avenue South
Renton, Washington 98055 ~ "'
DRAFT ENVIRONMENTAL IMPACT STATEMENT:
Black River Office Park, 71. 16-acre
manufacturing park adjacent to Black
River. in Renton, King County
Dear Mr. Clemens:
Your document was reviewed by our staff as requested; our comments
follow.
You state, "Approximately 84% of the site consists of a unique
wetland deciduous forest, a part of the largest forest of this
type in the Seattle area. As a result of the proposed action
about 78% of this riparian forest would be removed and be replaced
by building foundations, road and parking areas. " (page 4)
As you know, wetlands such as this wooded swamp are important for
fish and wildlife resources. Wetlands serve as sponges. They
store water in winter and buffer flood flows. In the summer they
dry out and release their water to adjacent streams. This helps
maintain low flows in the stream in summer.
You mention on page 54, "The Black River exhibits relatively high
nutrient concentrations and low levels of both dissolved oxygen
concentrations and turbidity. Springbrook Creek is characterized
by high bacterial contamination and nutrient concentration; in
addition, state standards for dissolved oxygen concentrations are
exceeded. "
The loss of wetlands would be expected to reduce dissolved oxygen
in the creek and river as flows are reduced in summer.
This proposal as planned may have some very serious consequences
for water quality.
21 =4-,•3
Mr. David Clemens
June 8, 1981
Page Two
You state on page 55, "It is planned that stormwater runoff will
be directed to the Black River Channel where it will receive
wetland treatment prior to discharge into Springbrook Creek. "
Under this proposal, would silt, oil, grease, and other contaminants
be routed to the wetland? It is unlikely the remaining wetland
(50-foot wide) would be able to remove silt, let alone prevent
oil and grease from entering Springbrook Creek and Black River.
Further water quality degradations would impact fish resources
in the creek and river.
Wetlands are important wildlife habitat. Wooded swamps provide
habitat for several tiers of wildlife. Because they border a
stream, they have increased wildlife value. Riparian areas serve
as wildlife corridors.
Your document lists mitigation measures that should or might be
done. We wonder what requirements would be placed on the develop- 3.
ment to mitigate impacts, especially loss of wetlands, water
quality, and fish and wildlife habitat.
From your discussion of fauna and flora, it seems that a U. S.
Army Corps of Engineers section 404 permit would be required for
any fill in the wetlands. You will need to contact the Corps 4.
to find out if they have jurisdiction. However, any unauthorized
wetland fill in an area under the Corps' jurisdiction could be _
subject to removal and financial penalty.
In short, we are very concerned over the loss of the public' sIF 5
fish and wildlife resources that would accompany this project.
Growth is going to have to be planned and be orderly if fish and
wildlife are to survive while urbanization is directed to those
areas most suited for it.
Thank you for sending your document. We hope you find our
comments helpful.
Sincerely,
THE DEPARTMENT OF GAME :
/-2"1.1
Bob Zeigler App ed Ecologist
Environmental Affairs Program
Habitat Management Division
BZ:cv
cc: Agencies
Region
-99-
Response to Comments from the Washington State Department of Game
Comment Number: 1
Entranco Engineers has conducted a water quality impact analysis, the
results of which have been included in this document as Appendix A.
The report includes a discussion of the effects of combined wetland
treatment of storm runoff discharge from Earlington Woods PUD, Earling-
ton Park and the proposed Black River Office Park. The use of oil/water
separators, installation of gabion structures, as well as frequent
street cleaning and the proposed wetland treatment, should result in
sufficient water quality treatment so that no:discernable degradation
would occur to Springbrook Creek. Also see response 3 on page 19 of
this EIS.
. Comment Number: 2
"Existing Conditions - Fauna; " on page 56 of the Draft
EIS is hereby amended to include: "Wetlands are important wildlife hab-
itat.. Wooded swamps provide habitat for several tiers of wildlife. Be-
cause they border a stream, they have increased wildlife value. Riparian
areas serve as wildlife corridors."
Comment Number: 3
When the Draft EIS states that mitigating measures "will" be undertaken,
it indicates that such measures are already planned as part of the proposal
or that the action sponsor will implement them. Use of other language
(such as "should" or "could") indicates that the City, at its discretion,
and in conformance with the City SEPA Ordinance and SEPA policies, will
consider these mitigating measures as possible conditions in association
with approval of a rezone or other development permit. Also see response
1 on page 14 of this EIS.
Comment Number: 4
Please refer to the response to comment 1, letter from the Army Corps of
Engineers on page 5 of this Final EIS.
-23-
Comment Number: 5
According to results of the hydrologic analysis conducted by Entranco
Engineers, water quality in the site vicinity would not be adversely
affected with the implementation of all the recommended mitigations.
Also, refer to the fourth paragraph of the response letter from the
Municipality of Metropolitan Seattle on page 32 of the Final EIS.
r--
-23a-
•
(;( enlur Y'%!! , Secretary
STATE OF WASP IINGTON
•
DEPARTMENT OF TRANSPORTATION
1 ut'Itway-Glm6ustrahcin liuiklin,' e Olympia, Wishinl;lun 9850.1 e (20o)75f-1)005
May 18, 1981•
+: .•)t. '
•
Mr. David Clemens, Acting Director
City of Renton Planning Department NV 19 1981
Municipal Building
200 Mill Avenue South 1/
Renton, Washington 98055
City of Renton .- -
Black River Office Park
Draft Environmental Impact Statement
Dear Mr. Clemens:
We have reviewed -the subject document and have the following comments:
The Transportation/Circulation Section of this Draft Environmental
Impact Statement is very brief and general . The traffic that this
proposal will generate was not assigned to any of the existing or
proposed site access roads. Therefore, we have to assume that a
large number of the potential 9,070 to 34,030 vehicle trips per day
that this development may generate will pass through the Monster '
Road (68th Avenue 'South)/Sunset Blvd. (SR 900) intersection. Given
this assumption we agree with the statement made on Page 81a of
this document, "This may involve rechannelization and possible sig •
-
nalization of the Sunset Blvd./Monster Road intersection."
The Department would like to point out that we have no money in our
current operating program to finance these improvements. The
developer through the lead agency should arrange to finance these
improvements in the project capitilization to prevent the existing
and new users of the aforementioned intersection from suffering
under poor safety and operative conditions for the foreseeable future.
If you have any questions, please call. Jim Leonard at 753-6644.
Sincerely,
ROBERT S. NIELSEN
Assistant Secretary for Public •
Tran tation and Planning
6/1
' By: JOSEPH BELL, Manager
Planning Implementation and
Environmental Policy
RSN:sab
JB/WBH
r•• J. f: 7irK1p/T_ R_ .;ur�_e -24- ;j
r � 3
I
Response to Comments from the Washington State Department of
Transportation •
•
Comment Number: 1
The TRANSPO Group has expanded its preliminary assessment of traffic
. conditions in the vicinity of the Black River Office Park site, the
results of which are included in this document as Appendix B. It con-
tains a travel. assignment estimate for volumes on Monster Road (page
2) and recommends various mitigations and improvements to enhance
smooth traffic flows (pages 4 and 5) . Because of the wide range of
potential traffic volumes that could use Monster Road (because of the .
wide range, of development potentials for this and other parcels in this
area) ,' it is impractical to specify a specific proportion at this point.
It is suggested, therefore, that at the time a more refined development
is planned for this site, the detailed traffic analysis and traffic as-
signment be used as a basis for determining the appropriate proportion
of costs. - The City indicates that any roadway and intersection improvements -1
j
shall be installed by the developer with appropriate reimbursement through a
latecomers agreement. The developer, however, has questions regarding the
legality of this approach.
Comment Number: 2
•
As noted above, the funding for any of the improvements recommended in the
Traffic Analysis is intended to be based on a proportional use formula.
The costs for improvements to any connection with Monster Road and/or
extension of the roadway along the west side of Earlington Park should .
be allocated in proportion to the traffic volumes generated by this
•
proposal compared with the total traffic volume using the section of
road that is improved. Thus, costs would be allocated in proportion
to the benefit received. Because of the wide range of potential volumes
that could use this road (because of the wide range of development poten-
tentials for this and other areas, in the area) , it is impractical to
specify a specific proportion at this point.. It is suggested, therefore,
that at the time a more refined development is planned for .the site and •
its application filed, the detailed traffic analysis and traffic assignment
• be used as a basis for determining the appropriate proportion of costs.
-25-
IrTTIl
lb
CREW
4PECETIED4%4%
COMMUTER POOL May 28, 1981
VANPOOLS
BUSPOOLS
RIDEMArcHING David Clemens, Acting Planning Director I MAY 29 1981
FLEXIBLE WORKING HOURS City of Renton Planning Department PARKING MANAGEMENT ``
Municipal Building
%9y ��'
200 Mill Avenue South
Renton, WA 98055 y��' DEP P���
:;III 1,1r 1(;r:OMPAf f I C 1
District Administrator Dear Mr. Clemens:
Washington State
Department of Transportation The Seattle/King County Commuter Pool has completed its review of the
Public Works Director Draft Environmental Impact Statement for proposed Black River Office
t;itv of f lr;nlon Park
Traffic Engineer project. With respect to the Transportation/Circulation section
King Countyof the EIS, Commuter Pool would like to make the following comments.
Director of Public Works We commend and encourage the proponents initiative in addressingthe
City of Kirkland g P �
Manager of transportation impacts and possible mitigating measures at this early
Transit Development stage of project development. The suggestions to reduce parking space
Metro requirements at the project site, to provide subsidized transit
Transportation Engineer passes, to actively inform tenants and employees of fleetride, van-
City of Bellevue pool, and carpool options, and to encourage the flex-time system of
Traffic Engineer work scheduling, are all acceptable methods to encourage alternatives
City of Seattle to the single occupancy vehicle.
We realize this DEIS is intended to address the environmental impacts
of the proposed rezone only at-the general "land-use" level and that
specific site plans and au:'. mpanying detailed traffic/parking data are
still forthcoming. We nevertheless feel compelled at this time to
make several additional suggestions in an effort to more clearly spe-
cify the level of commitment required of the proponent to successfully
• mitigate the adverse traffic impacts of this proposal.
We would like to recommend, upon completion of a detailed study of on-
site parking availability and usage, that the proponent thoroughly
• explore the potential for supplementing an aggressive ridesharing
program which would include preferential carpool/vanpool parking,
sponsorship of a vanpool program, and other affirmative efforts as a
means to reduce the traffic/parking impacts. We believe this is
important because merely "advising" tenants and employees of the
advantages of fleetride, carpool, vanpool etc. is an insufficient
degree of commitment to brir, about the desired results. Neither is
it sufficient to assume that the worsening traffic conditions will
persuade commuters to seek alternative modes of travel. It has been
our experience that for large numbers of commuters to change their
travel behavior they must be given an opportunity to do so through
SEA F/KING COUNTY
I,C)r 1Mltfl•lt POOL
Arr uc fBuiirlinq.Room 600
704 Third Avenue
:;(2.tali Wn:hinrllon OH 104
f:'06)6:'S 4651
I -26-
page two
May 28, 1981
II
an organized ridesharing program. Such a program for this proposal
(especially if coordinated with the nearby Earlington Office Park
development) could reduce the adverse traffic impacts to a more
tolerable level.
As the proposal design and activity mix become clearer, these
suggestions will more direcv.y relate to the Black River Office Park
and can therefore be more effectively addressed in a subsequent draft.
We are including a list of possible methods the proponent might employ
in devising solutions to the traffic/parking problem. Commuter Pool
would be happy to provide any assistance or answer any questions you
might have. If so, please contact Jan Aarts at 625-4500.
Sincerely,
LA,N,
William T. Roach
Program Manager
WTR:JAm
-27-
1.
ei Initiate carpool/vanpool program for employees, either in-house or
through participation with Commuter Pool. (Ridesharing Prog.)
l�' Employee transit subsidy provision to those employees who are unable
to participate in a car- or vanpool. Preferably pre-paid, and dis-
count included. (Ridesharing Prog.)
(5 Reduction in employer provi:jsd parking. /Restriction in emplyee parking
spaces (long-term) (Parking Mgmt..
Preferential parking for car-vanpool vehicles in employer provided
lots between 6 A.M. - 10 A.M. (parking Mgmt.)
•
5. Inverted parking fee rate structure, e.g. , :
a. 50% discount for carpools of 2 passengers, including
driver. .
b. 75% discount for carpools of 3 rp passengers, including
driver.
c. 100% discount for cx«pools of 4 passengers, including
driver. (Parking Mgmt.)
•
6., Work with Commuter Pool in adopting a suitable flexible work hour Cflex-
time) program, e.g. , :
a. Employee-chosen staggered starts, with stable daily
schedules, but letting each employee's schedule begin
insofar as possible at the time he prefers over a
designated range such as 7:00 to 9:30-A.M. and end at
at time dependent on the staring time.
b. Flexible starts over a designated range such as 7:0Q to
9:30 A.M. , with a fixed lunch hour and variation in
quitting time dependent on the starting time.
c. Flexible hours, defined as flexible starts plus per-
mission to vary the daily lunch hour at each employee's •
convenience, usually over a specified range.
d.. Flexible days, which in addition to flexible hours permit
variations in the length of time worked each day, such
as from six to none or ten hours, so that excess time
worked can be accumulated and used to take a part or all
of a day off--the most popular is Friday afternoon--from
time to time. (RidesharingTrog.)
. Work with Commuter Pool in determining the feasibility •of developing a
'vanpool program for the employees, e.g., :
a. Employer operate
r
-28-
Z.
b. Owner/Employee operated
c. Third party operated (Ridesharing Prog.)
8. Where there are on-site residential accomodations, a one month free
transit pass be provided to all new tenants. (Residential)
6) For employers with at least five company-owned vehicles, work with
Commuter Pool in determining the feasibility of permitting those
vehicles to simultaneously be utilized for employee ridesharing
purposes. (Ridesharing Prog.)
10. A reduction in the leasing rate, contingent upon the leasee*s pro-
vision of preferential parking treatment of carpools and vanpools,
coupled with charging for parking. (Parking Mgmt.).
41) Subsidize or share the cost of a subscription bus or shuttle bus
service where feasible. (Ridesharing Prog.)
0. Establish a transit/ridesharing information center in a visable,
well travelled area of the building providing information regarding
transit routes carpools and vanpools, location of Commuter Pool
program office. (Information)
Conduct a carpool and public transit information day twice a year
with the assistance of Metro and Commuter Pool. (Information).
14. Establish parking rates where none previously existed which reflect 1
the actual cost of each space. (Parking Mgmt.)
15. Provide carpool, vanpool and transit information to all new residents '
(provided by C.P.) . (Residential)
16. Allocate a portion of guest parking lot facilities as common staging
areas for car/vanpools on weekdays from 7 A.M. to 6 P.M. (Residential)
-29-
Response to Comments from the Seattle/King County Commuter Pool
Comment Number: 1
The proponent of the proposed• action appreciates the concerns of the
Commuter Pool with respect to the potential transportation impacts
associated with development of the site and will cooperate in. estab-
' lishing a voluntary ridesharing program to reduce the traffic/parking
impacts.
•
-30-
(53,70)i;
41 Municipality of Metropolitan Seattle
Exchange Bldg. • 821 Second Ave.,Seattle,Washington 981O4
•
May 26, 1981 Ty 4-;'.l f 10%
5''• 1
CIT
David Clemens, Acting Director `i3 ~v ti
Renton Planning Department
Municipal Building `` �� ..;
200 Mill Avenue South
Renton, Washington 98055
Dear Mr. Clemens:
Draft Environmental_ Impact Statement
Black River Office Park Rezone
Metro staff has reviewed this proposal and offers the
following comments.
•
Wastewater Facilities/Water Quality
We note the proposal is located. within Metro' s Renton
Treatment Plant service area. Metro is preparing a
facilities plan for the Renton system with a grant from
DOE and EPA, in part because the Renton Treatment Plant has
reached its "design" capacity and continued development is
occurring within the service area. A draft plan for the
Renton service area was recently released for review and
comment and contains a recommended program for upgrading
the Renton system so that water quality and health will
continue to be protected.
The following water quality concerns should be discussed
in the FEIS:
•- Design and maintenance plans for the on-site stormwater
detention facilities should be incorporated into the
Final EIS . The riparian forest and wetland on the
site are water recharge areas, and would serve a
valuable function in the stormwater control system if
they were saved from development.
• The Soil Conservation Service' s East Watershed Project
is described on pp. 86-88 of the DEIS. That section
lists elements of the SCS project which will control
stormwater from this and other developments within the Z.
Black River drainage sub-basin. The proponent should
provide a schedule of the East Watershed Project as it
relates to the schedule for development of the office
park.
-31-
David Clemens
DEIS/Black River Office Park Rezone
May 26, 1981
Page two
We anticipate no significant adverse impacts to adjacent
water quality provided that all mitigating measures listed
on pp. 104-105 of the DEIS are implemented. For further
discussion regarding the above comments please contact
Metro's Monitoring and Analysis Section at 447-6359 .
Transportation
We note the measures listed on page 8 of the DEIS regarding
use of transit to mitigate transportation impacts of the
proposal. Mr. Jerry Dow of Metro' s Transit Development
Division is available at 447-6627 to discuss possible
service extensions to the site. Ms. B. J. Carol, Supervisor 3'
of Customer Assistance, can be reached at 447-4829 to
discuss employee bus passes, transit information, and other
transit incentive measures. y .
Thank you for the opportunity to review and comment.
Very truly yours,
! Q 1
Rodney G. Proctor, Manager
Environmental Planning Division
RGP:shm
cc: B.J. Carol ^ '
Jerry Dow
Monitoring & Analysis
-32-
I ,
Response to Comments from the Municipality of Metropolitan Seattle
Comment Number: l
Development of the site as currently proposed would eliminate approx-
imately 65.4% of the riparian forest on the project site, and would
replace approximately 70% of the site with impervious surfaces, thereby
reducing the natural stormwater control and groundwater recharge propor-
tionately. As stated on page 55 of the Draft EIS, the stormwater drainage
will not be detained on the site, in accordance with the East Side Green
River Watershed Project. The EIS suggests that temporary stormwater
detention facilities be installed during the construction period. This
mitigation may be required as a condition of development, in which case,
the developer will install the facilities. This EIS has addressed the
impacts of rezoning the site from General Classification to Manufacturing
Park and development generally consistent with this zoning. When specific
development plans are proposed, additional...EISs will be issued and, at
that time, specific design plans for on-site stormwater detention facilities
will be included.
Comment Number: 2
As stated above, this EIS has addressed the impacts of the rezone of the
site from General Classification to Manufacturing Park, and the general
uses allowable by such rezone, rather than the impacts of a specific
development proposal. This site plan on page viii of this Final EIS is
intended to be representative of probable development to occur on the site;
however, as yet, no specific proposal is planned. Therefore, the relation-
ship of site development to the scheduling of the Eastside Drainage Project
cannot be determined at this time. However, failure of the SCS P-1 system
to be developed could affect development of the subject property. Natural
flood storage wouldlneed to be maintained unless an alternate flood reduc-
tion system were established. Such a program would be the subject of
other environmental documents and permit approval requirements.
Comment Number: 3
Please refer to the response to comment 1, letter from Commuter Pool on
page 30 of this Final EIS.
4 I
-33-
--,, tS�uyilr i .1
: t�E�%r>�.tY~�~:-�_:`�r�s, �/ �;=?�! 410 West Harrison Street,P.O.Box 9863 (206)344.7330
;I i*"'6 -L s%y rz^r Seattle,Washington 98109.
;"s rs r y.;:—yaCr1
May 27, 1981
•
Mr. David ClemenskECE�
Acting Planning Director NftsJ vvED��o
2
City of Renton Planning Dept. • JUN I
Municipal Building lsa1
200 Mill Avenue South �.a _ .
Renton, Washington, 98055 (.1 ��).
Dear Mr. Clemens: Alg.,_DEPA
Black River Office Park J'
•
We are submitting the following comments based on our review of the
Black River Office Park draft e:rrironmental impact statement. •
- - It does not appear that the air quality impact from the estimated
9;000 to 34,000 vehicle trips per day has been addressed. This is
• a significant amount of vehicle trips and the amount of potential
pollutants needs to be evaluated. It is suggested that on-site I. 1
monitoring and modeling be performed to determine current and future •
carbon monoxide concentrations. We strongly recommend that modeling
be performed to determine whether the project will delay attainment
of the carbon monoxide and ozone standards, since this project is -
located in the carbon monoxide and ozone nonattainment area. It is.
also recommended that all mitigating measures discussed in the re- 2.
•
port (page 53) be implemented to reduce construction related emissions.
The upgrading of existing roadways and other mitigating measures dis-
cussed in the Transportation section (page 80) should be implemented.
Thank you for the opportunity to comment.
SERVING:
KING COUNTY Sincere
410 West Hat rison St. y,
P.O.Boa 9863
Soallle.ening •
(209)344•r33u
KITSAP COUNTY
Dial Operator for Toll . R. Da t r r koe hle r
Free Number Zenith 8385
Bainbridge Island.98110 Air Pollution Control Officer
Dial 344.7330
•
PIERCE COUNTY SC
- 213 Hess Building
•
Tacoma.98402
(206)383.5851
SNOHOMISH COUNTY
(206)259.0288 '
BOARD OF DIRECTORS •
CHAIRMAN*Gene Lobe.Commissioner Kitsao County: VICE CHAIRMAN'James B Haines.Councilman Sranonush County
Ron Du tap.King County Eaccuhre: Glenn K.Jarslad.Mayo:2:emetion. William E.Moore.Mayor Everett: Mike Parker.Mayor Tacoma
Halsey S.Poe,Member al Large. Charles Royer.Mayor Seattle: Joe Slortini,Commissioner Pierce County: A R.Dammlroenler,Ai!Pouul,on Control Olticer
—34— •
Response to Comments from the Puget Sound Air Pollution Control Agency
Carbon monoxide monitoring in the area was conducted at the Puget Power
Yard until June 1977. The peak hour carbon monoxide concentration re-
corded at that facility was 3.2 parts per million (ppm) , substantially
less than'. the Washington State ambient air quality standard of 35 parts
per. million. It may be assumed that existing peak hour carbon monoxide
concentrations have increased from the 1977 level due to the increase in
traffic volumes in the area.
The methodology outlined in AP-42 "Compilation of Air Pollutant Emission
Factors," Second Edition, Supplement No. 5, February, 1976 was utilized
in calculating the potential increases in carbon monoxide concentrations
resulting from development of the proposed Black River Office Park. This
analysis was based upon worst case conditions occuring during the evening
peak hour, during which, according to the traffic consultant, maximum of
3,790 vehicles could be generated. In addition, base conditions for this
analysis are as follows: rush hour conditions (50% cold start, 10% hot
start)'; vehicle mix for a central city area at 10 miles per hour; 100 -
foot receptor distance; parallel winds (2 mph wind speeds) and 50o temper-
atures. The results of this analysis indicate that maximum traffic vol-
umes generated by project implementation could potentially produce average
peak one-hour carbon monoxide concentrations of approxmiately 10.4 parts
per million (ppm) .
The Washington State Air Monitoring Data for 1980, published by the
Washington State Department of Ecology, indicates that the nearest moni-
toring station recording levels of ozone is located in Kent, at which
there were no recorded violations of the national standard.
A more detailed air quality impact analysis will be prepared when speci-
fic development plans are proposed.
Comment Number: 2
Comment noted.
-35-
•
King County,State of Washington am' PlanningDivision
Ron Dunlap,County Executive r+J�y
b � r^4 %' to pi W217 King County Courthouse
Department of Planning and y
Community Development 516 3rd le, ue
John P.Lynch,Director ��. Seattle,Washington 98104
(206)344-4218
May 29, 1981
gUTP
f O
Mr. David Clemens : f'V 1 �
Acting Planning Director JUt�
City of Renton Planning Dept.
Municipal Building
• 200 Mill Avenue South .94/
Renton Washington 98055 -"iNG DEp�P
Dear Mr. Clemens:
Re: Black River Office Park--Draft EIS
We have reviewed the subject EIS and feel the proposal raises a number
of significant issues that need i.o be addressed prior to further ap-
provals by the City'. Our concerns are as follows.
GENERAL COMMENTS
Relationship of Riparian Forest to East Side Project
Local sponsors of the East Side Watershed Project with the cooperation
of the Soil Conservation Service are completing right-of-way and design
studies for the first phase of the project, which includes the storage
pond area immediately south of the proposed action. Design studies
include plans dealing with revegetation and landscaping, fish and wild-
life enhancement and passive recreation development, all intended to
promote the storage pond area as a viable wetland marsh and wildlife
habitat offsetting the adverse impacts of channel construction in the
Renton area.
The riparian "edge" between the storage pond and Black River woods has
been identified as a significant element, important in its unaltered
form, for the habitat and wildlife potential of the storage pond to
realize its maximum potential . The final EIS and future site plans
should acknowledge the significance of the Springbrook Creek riparian
edge and should discuss what measures are proposed to minimize adverse
affects that would compromise enhancement plans for the storage pond
area.
Additional Studies and Analysis
The draft EIS indicates that future environmental and economic consequences
—36—
Mr. David Clemens May 29, 1981
Page 2
of the proposed development will be addressed in supplementary plans
and studies. These additional studies are noted throughout the draft
statement and include detailed site plans, additional environmental
documents, economic analyses of costs and revenues accruing to Renton
from the development, groundwater and soils studies, transportation and
traffic analyses and a subsurface coring program to determine if ar-
chaeological significant resources exist on the site. The process and
schedule for conducting these studies and their relationship to the
current EIS and future actions by the City of Renton on the project 2
need to be more clearly outlined in the final statement. Based on the
number of additional studies and the significance of their scope, we
feel the rezone decision should be not be made until these analyses
are substantially completed.
Public Acquisition of Black River Woods Site
The EIS has understated the nu action alternative and potential for e
public acquisition of the site, suggesting that because of the high I,
market value of the property and its designation in the comprehensive
plan for manufacturing park use the feasibility is unlikely. Current 3
studies underway as part of a County-wide parks and open space bond
program have recommended the Black River woods property as the third
highest priority wetland for acquisition under the bond program. The
site was originally recommended to the parks bond program by the City
of Renton.
It is expected the bond issue will be presented for voter approval in
1982 with funds potentially available later in the year for site acqui-
sition. Public acquisition of the site is. a potential alternative which
should be developed more comprehensively in the final EIS including a
detailed evaluation contrasting the benefits and impacts of such an al-
ternative with other development alternatives.
Balance Goals for Resource Protection and Economic Development
The proposed action and alternatives 1 and 2 which require removal of
from 67 to 80 percent of the riparian forest are inconsistent with many
of the environmental , open space and resource preservation objectives of
the City's recently adopted Comprehensive Plan--Policy Statement. Miti-
gation measures proposed to offset these adverse impacts are generally limited
to saving of significant trees and vegetation in undefined greenbelt areas,
implementation of a master landscape plan, and preservation of vegetation
in a 50 foot corridor along the Black River channel .
We do not feel these measures compensate for the detrimental impacts
the proposed action will have on the riparian forest which is acknow-
ledged in the EIS as unique, rare and the best remaining climax
-37
'
Mr. David Clemens
May 29, 1981
Page 3
riparian forest in the Seattle area. The final EIS should clearly discuss
how the City's goals and objectives for protection and preservation of 4
unique natural resources have been balanced with goals for economic
development.
SPECIFIC COMMENTS
pg. xiii The conceptual site plan should be corrected to show the flood
storage pond upstream of the P-1 pump plant in its present
design configuration. Preliminary land rights maps, including 5
proposed spoil disposal areas, are available from the Renton
Watershed Office of the Soil Conservation Service.
pg. 9 Park and recreation impacts fail to note the substantial re-
I] (9
creation demand which will be created by the projected 4,100
employees who wi77 work at the business park.
pg. 19 The statement does not reference the Renton Parks and Recreation
Plan which cites the Black River Woods as "potential wetland" 7
or the Renton Wetlands Report which describes in detail the
unique ecological significance of the Black River woods.
pg. 48 The draft EIS notes that up to 70 percent of the surface top
soils will be displaced or covered by landfill as a result of g
the development. The final statement should discuss opportunities
for utilizing topsoils in landscaping and berming and the
potential for removing and stockpiling topsoil resources prior
to landfilling the site.
Low slope gradients to not guarantee that erosion will be minimal
during disruptive e:._avation, filling and construction activities.
Erosion and sedimentation control plans should be prepared for 9
the development, particularily due to the close proximity of
the site to the Black River channel and Springbrook Creek. _
pg. 55 The East Side Watershed project does not require that surface
runoff be removed from the site as quickly as possible.
Runoff controls are regulated by the City of Renton which re-
quire stormwaters to be retained on-site and released at a to
natural rate incorporating natural drainage features (pg. 22) .
The final EIS should contrast the trade-offs between retaining
runoff on-site in retention ponds which could be developed as
site amenities and piped stormwater systems discharging directly —
to receiving waters as proposed for the project.
pg. 57 State Flood Control regulations do not require that lands in
floodplain areas be filled to accomplish flood protection, only 11
that development be floodproofed above future flooding elevations.
-39-
Mr. David Clemens
May 29, 1981
Page 4
Landfill has been the conventional method of floodproofing in
the Green River Valley however, other alternatives are available.
pg. 60 The vegetation map is very general and not completely consis-
tent with the Renton Wetlands report and other existing field i
inventories. Further we do not agree that trees in this area
will tolerate a heavy layer of crushed rock and resulting soil
compaction.
Tree inventories should be done in the context of site and open
space planning, considering opportunities to mass greenbelt
areas around important trees and other significant vegetation i3
or wetland areas. Saving individual trees without attendant
plant and soil support systems will not enhance the surviv-
ability of the trees or their significance as part of the
overall site plan.
pg. 81a Access to Monster Road to the west via a bridge across the pump-
ing plant outlet channel may result in a hazardous and ineffi-
cient intersection without substantial improvements to Monster
Road. Although the EIS suggests that Monster Road should be
upgraded, it should go on to discuss the specific improvements
proposed, a schedule for their implementation and how these
improvements will be funded.
The statement suggests an alternative westerly access from the
Black River site by extending the west perimeter road in
Earlington Park to the north. Such an extention would appear
to require a crossl"g of the planned flood storage pond upstream
of the P-1 pumping plant which would be inconsistent with pro-
grams under study to enhance the storage pond for wildlife and t4
recreation purposes. The final EIS should clearly document
the need under any circumstances for a westerly access from the
site particularily for site plans which would concentrate
development on the eastern part of the site.
pg. 82 The mitigating measures proposed under fire s rvices do not deal
with the impacts and concerns expressed by th Fire Marshall in is
Appendix D; specifically, that "further develo ment in this
area should be limited until such time as improvements can be
made to provide timely first response capabilities."
pg. 85 Field inventories ari recreation analysis currently being con-
ducted for the East Aide Project have not concluded that heavy
vegetation on the Black River woods site preclude opportunities
for passive forms of recreation. To the contrary, the site is
seen to have outstanding potential for scientific, educational
and interpretive forms of recreation with very minor site alter-
ations to improve access.
-39-
Mr. David Clemens
May 29, 1981
Page 5
Conceptual recreation plans for the East Side Project will be
completed later this year. A significant component of these
plans will be recreation guidelines dealing with the relation-
ship of the East Side project rights-of-way with other adjacent 17
park and open spaces as well as trail linkages between Green
River parks and other facilities. Trail corridors through the
Black Ri""er woods and Earlington Park areas will be more
definitive at that '.ime and hopefully can be incorporated into
site development plans.
pg. 88 The term "wetland treatment" needs additional definition. '
•
Discharging storm drainage immediately into the Black River
channel where residence time in a wetland environment may. . !S
tend to enhance; the quality of the water leaving the channel
should be compared with the effect such discharges will have
on the health and ecological viability of the wetland. —
pg. 109 Tables showing acreages for different uses and percentages
of expected site coverage for these uses under the several r9
alternatives are very confusing and not consistent with textual
descriptions of the alternatives describing how much of the
site will be developed and how much will be left in open space.
Further, these acreages and percentages are not consistent zo
with one another throughout much of the EIS (e.g. , pg. 2,
pg. 15 and pg. 55).
The concentrated development alternative may not result in
reduced building space and profitability if transfer of Z�
development credits concept is applied. Alternative 2 should
be expanded or another alternative should be developed to
discuss such an option.
Thank you for the opportunity to review the statement. If you have questions
concerning our comments please feel free to contact Dave Clark at 344-7990.
Sincerely,
arold Rober on, Act. Mgr.
Pla::.ling Division •
HR:le
cc: Bob Edmundson,
County SEPA Coordinator
Herb Young,
Surface Water Management
-an-
^ -I
Response to Comments from the King. County Department of Planning •
and Community Development
•
•
Comment Number.: 1
The conceptual site plan for the proposed rezone action has indicated
that a 50-150, foot buffer preserved from development would be maintained
along the southern property. line, which would. ensure that the valuable
Springbrook Creek riparian edge would remain undisturbed. Also, see corn-
ment 1 on page 19 of this EIS.
Comment Number: 2
This Draft and Final EIS are intended to address the environmental impacts
of the proposed rezone and the total proposal. Development parameters have
been. assumed to permit reasonable. analysis of impacts 'which may occur as a
result of development, although specific development plans have not been
developed. Specific site plans and detailed economic and groundwater anal-
yses, as well as tree inventories, and traffic and parking data will be
developed if and when site specific development plans are proposed. The
scheduling for the subsurface coring program will be decided by the City
of Renton Environmental Review Committee.
As noted in response to comment number 1, page 14, establishing the propriety
of a rezone .proposal lies with the proponent. If the support provided by
the applicant and evaluated for its environmental impacts herein are insuf-
ficient, the proposal may be modified or rejected.
Comment Number: 3
According to Jeanette Veasey of the King County Parks Planning Department,
the King County Parks and Open Space General Obligation Bond Proposal is
tentatively scheduled to be placed on the ballot in Fall of 1982. However,
Ms. Veasey indicated that the riparian forest on the site is not included in
.the acreage to be considered for acquisition.
Comment Number: 4
In as much as 78% of riparian forest will be removed, the proposal is not
consistent with the Balanced Development Objective. The proposal is gener-
ally a tradeoff between private gain as well as additional commercial and
-41-
industrial facilities for the city and the transformation of a natural
area. This tradeoff will be evaluated during consideration of the rezone
proposal and at further points in the review of specific site plans.
Comment Number: 5
Please refer to the conceptual site plan on page viii of the Final EIS
for graphic depiction of the proposed P-1 storage pond in relation to the •
site.
Comment Number: 6
To reflect the concern raised in the letter from the King County Planning
Division, the following information is hereby inserted in the discussion
• of "Parks and Recreation - Impacts," on.pages 9 and 85 of the Draft EIS,
as follows:
"An increase in demand for recreational
outlets will be created on .the site with
the addition of approxmiately 4,100 em-
ployees."
According to Mr. John Webley, City of Renton Parks' and Recreation Director,
there is no accepted set of standards for determining park and recreation
facility demand based upon projected employment. However, at the time
specific site plans, are developed, the proponent will work with the City
of Renton Park and Recreation Department to develop on-site recreational
facilities in order, to mitigate demand generated by the proposed develop-
ment for existing off-site recreational facilities. (Source: Telephone
I_ conversation with Mr.. John Webley, Director. of Parks and Recreation for
the City of Renton, March 11, 1982.)
. Comment Number: 7
For a discussion of the Renton Wetlands Report please refer to the
response to comment 8, letter from the U.S.D.A. Soil Conservation
Service on page 11 of the Final EIS.
The following discussion of the City of Renton Comprehensive Parks and
Recreation Plan is hereby inserted into the Draft EIS on page 44 as
follows:
;
-42-
"This document contains an inventory and
evaluation of existing recreation condi-
tions by geographical area, as well as
recommendations for future acquisition
and development of parklands. Specific
to the subject proposal, a graphic on
page G-15 of the report indicates that a
portion of the subject site is desig-
nated for acquisition as wetlands. On
page H-1 of the Plan, the Summary of
Recommended Acquisition Priorities ranks
wetland acuqisition as the fourth prior-
ity. According to the Plan, $400,000 was
budgeted for wetland acquisition for 1980.
None of the budgeted funds have been allo-
cated to purchase of the Black River forest. "
Comment Number: 8
According to the project soils engineer, the topsoil on the site
is intended to remain to serve as a mat separating the fill and
construction machinery from the silty fine sand underneath, which,
if disturbed, would turn to unsupporting mud.
Comment Number: 9
On pages 3 and 56 of the Draft EIS, it is suggested that temporary
storm water detention and settling facilities be installed during the
construction period to collect silt and minimize turbidity. This mi-
tigation may be required as a condition of project approval, in which
case, the developer will install the facilities. This EIS has addressed
the impacts of the rezone of the site from General Classification (G)
to Manufacturing Park (MP) . When specific development plans are proposed,
supplemental environmental analysis may be required in accord with the
SEPA guidelines. At such time, engineering information and details re-
sonable related to the proposal's definiteness will be prepared.
Comment Number: 10
It is the intention of the designers of the East Side Drainage Project
and consistent with the City of Renton policy that storm water runoff
be discharged from the site to the P-1 pump station as quickly as pos-
sible before the peak flow from upstream reaches it. The proximity of
the subject property to the P-1 Channel precludes the need for on-site
-41-
storm water detention, subject to previously discussed provisions to
insure discharge water quality.
Comment Number: 11
Comments noted.
Comment Number: 12
• A review has been made of the various existing studies of the vegetative
character of the subject property and it was concluded that the discrep-
ancies between them are not of sufficient magnitude to affect the con-
clusions respectively drawn. If rezoning of the site is granted, more
specific analysis will be provided regarding the compatibility of the
riparian vegetation' with the precise development proposal.
Comment Number: 13
As indicated in the response to comment 2, above, when specific site devel-
opment plans are proposed following granting of the rezone, then supple-
mental environmental analyses, including a tree inventory, may be required
by the Renton Planning Department pursuant to the SEPA Guidelines.
-44-
Comment Number: 14 •
It is intended that Monster Road be improved to a minimum two-lane
•
•
roadway with no parking. Right-of-way should be retained in areas
where there are existing or possible intersections with driveways and/
. or streets to permit the addition of auxiliary turning lanes where
traffic volumes warrent. -
The funding for any of the improvements outlined is intended to be
based on a proportional use formula. The costs of improvements to
any connection with Monster Road and/or extension of the roadway along
the west side of Earlington Park should be allocated in proportion to
the peak hour traffic volumes generated by this proposal compared with
the peak hour traffic volume using the section of road that is improved.
Thus, costs would be allocated in proportion .to the benefit received.
Because of the wide range of potential volumes that could use this road
(because of the wide range of development potentials for this and other
parcels in the area) , it is impractical to specify a precise proportion
at this point. It is suggested, therefore, that at the time a more re
fined development is planned for this site, the detailed traffic .analysis
and traffic assignment be used as a basis for determining the appropriate
proportion of costs.-
The westerly connection could divert up to 25 percent of the traffic
generated by the Black River Office Park and a like percentage of the
traffic generated by Earlington Park. This mitigating measure is recom-
mended since diversion of travel to the west would tend to slow down
traffic growth on Rainier Avenue, I-405, and Grady Way. Such an improve-
ment would simply decrease the length of the peak period in the vicinity
of the project. This improvement would not eliminate nor result in an
improved level of service on these routes since conditions already
operate at LOS E (capacity) . If full development of the site is provided
for in the zoning process, the westerly access will he required hy the Phase
I site development. Initial construction would consist of 2 travel lanes
with the remaining improvements accomplished during Phase 2.
•
-45-
Comment Number: 15
Please refer to the added mitigation to offset fire protection
impacts, stated as the response to comment 1, letter from the City of
Renton Fire Marshall, on page .49 of the Final EIS.
Comment Number: 16
To reflect the concerns of the King County Planning Division response
• letter, the final sentence of the discussion of "Parks and Recreation -
Existing Conditions," on page 85 of the Draft EIS, is hereby revised
to read as follows:
"The site is presently heavily vegetated,
which precludes any opportunity for trad-
itional forms of active recreation, but
would support scientific, education and
interpretative forms of passive recreation
with minor site'. alteration to improve access."
'
Comment Number: 17 ;
Comment noted.
Comment Number: 18
Please refer to the response to comment. 5, letter from the Seattle
District Corps of Engineers, on page 6,, and U.S. Department of Interior
comment 3,-page 19 of the Final EIS.
Comment Number: 19
A comparative review of the information contained within the text of
the alternatives discussion on pages 109-111 and. that on Table 10 on
page 112 of the Draft EIS does reveal discrepancies between them. To
correct the inaccuracies, the text of the respective alternatives is
hereby revised to reflect the percentages listed on Table 10 entitled
"Comparative Analyses of Alternatives."
-46-
•
Comment Number: 20.
To correct the inaccuracies in open -space and riparian forest calculations
the following revisions are hereby made: The. initial sentence on page 2
li
of the Draft EIS is revised to read as follows:
"Development of the proposal will necessi- -i
tate removal of 46.11 acres of the 59.5
acre riparian forest located on the site."
Also, the sentence describing "Flora - Unavoidable Adverse Environmental
iI
Impacts," on page 15 of the Draft EIS is hereby revised to read as
follows:
"About 77 percent of the natural riparian
vegetation on the site would be removed."
This impact would be partially offset by the. introduction of landscaping
on the project site.
• Comment Number: 21
An additional alternative depicting concentrated development has
been included in this Final EIS, -as depicted on the conceptual site
plan on the following page. Project design would include the replace-
ment of scattered smaller structures with three larger, 6 to 10 story
structures. The height would be determined in part by the adequate
ratio of parking which could be installed on the site with this
alternative. This alternative would result in 29% of the site being
developed with 24.7 acres (42%) of the riparian forest preserved from
development. The largest nodes of preserved riparian forest vege-
tation are illustrated on the site plan. These would include areas
of : Node A = 9 acres
Node B = 6 acres
Node C = 5 acres
The
remaining
4.7 acres are included in smaller lineal connections
between the more prominant nodal areas. The feasibility of this alter-
native depends upon future construction costs and market conditions.
-46a-
j
1
1
• . .
•
BLACK __ RIVER
OFFICE PARK
RIM THORPE AND ASSOCIATES
Imo,;. \
%z I .. ..
■ o _ .. eo.s^. 0100 _ - 400 _ ._ 800 NORTH
.4,„„So ..-iii , IV
•
A °i t=•°.b� ii: �a Imo_ .i:O ore �e c. P% • ••-: ��- t�� tl si I_ -
o
m 71 O s YS' d•,7nawMaaulr 0• /.,��✓�— } h. 'i+t ���GGGJJ_ 'f� T
;u 1 a , a'Dro, a o• ..�, �� �, a r4at�ogo�
�S` / A - - O%.f \ _ 1.�•'� _ �•��P���• .i���• •lp_i°d0:01?i•500�
iatt 1.
•
D N I 1 Lei. �l :11 : f P P NT_
_v y_\ iI ! 1yl� r
a1°�w� \ �I L I-1; l /
z m --� 9 .
O `� I. ,
n \ 4tr
0) "I \
N m * - o IES
O n 7f 6 10 STORIES
A
m
Nm .11
•
LVI, .rah.a.•
FROM THE DESK OF . . . 4/3/81
JIM MATTHEW
FIRE MARSHAL
TO: Dave Clemens, Acting Planning Director
RE: Black River Office Park Rezone
Dave,
•
I have reviewed the draft document for environmental impact on the above named
project. Its impact is very similes_ to that of the Earlington Park Project.
To look at one requires considering the overall effect of the total development
in the area and its impact on present city services.
The mitigating measures expressed on page 82 do not demonstrate how the developer
plans to provide the necessary fire services for the area. Our concerns are in
regard to site access and timely response to the area. The present site access
is limited to essentially a one-way response from the main station at South 2nd
and Mill Ave So.. It cannot be assumed that the response will always come from
the station, since many times the equipment is in the district on inspection and
detail. Access to the proposed development from the north is restricted by nat-
ural and man-made barriers. The steep hillside and railroad right-of-way prohibit
travel directly from the north. Trucks on detail in the north would have to back-
track through Renton in the event of an alarm.in a building located in this de-
velopment.
The private fire protection proposed is an important aspect of the project but it cannot completely substitute for a ,basic fire response. The need for addition-
al fire facilities located in the valley presents itself with this development.
The purpose of the SW 19th and Lind Ave S. W. side was dedicated just for this
purpose. Mitigation of the response time problem.could be accomplished by the
construction of a station at that site, providing an engine company staffed on
a 24-hour basis with 3 personnel. .
Consideration should be given now to providing a method of funding and timetable
nstruction of this station.
f 4. d./- 7
/JAMES F. MATTHEW'
Fire Marshal
•
JFM/wp
-48-
Response to Comment from the City of Renton 'Fire 'Marshall
Comment Number: 1
It is recognized that the site is relatively isolated with access
generally limited to emergency response from the east. As a result,
consideration should be given to methods of reducing the fire hazards
and life safety exposure. This can include locating a new station in
closer proximity to the site, reducing the overall development density
and allocating allowable development only to those areas of the site
within a five minute response distance from the current stations. Funding
for new fire station capital costs will be borne in part by the developer.
Comment Number: 2
The project is proposed to be constructed in two phases with Phase 1
accessed by a single road connecting to the road system to serve the, proposed
Earlington Park development adjacent to the south of the site. Phase 2,
on the western portion of the site, will connect to the Phase 1 road system
and also be served by a secondary access to Monster Road across the P-1 -
drainage channel. Thus, at project completion, the total site would be
served by roads extending to both the east and west. Also, please refer
to the response to comment 1, above.
49
OF
o THE CITY OF RENTON
U 4/ Z MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.98055
_ �h
2 NAL • BARBARA Y. 'SHINPOCH. MAYOR o POLICE DEPARTMENT
o HUGH R.DARBY, CHIEF
A Q`
0,91TzO soleMO�
MEMORANDUM
March 31 , 1981
TO: Dave Clemons, Planning Department
•
FROM: Lt. Don Persson
SUBJECT: BLACK. RIVER OFFICE PARK
This development will have an impact on police services in three area that are
not adequately addressed in the preliminary impact statement. They are:
(1 ) Traffic Problems
Every roadway into the area is currently operating at its peak level .
The addition of phase one of this project without the completion of
the entire roadway system needed for both phase one and two would put
a burden on the roadway system that would generate numerous traffic
collisions and traffic tie-ups. This would dictate additional traffic
enforcement and traffic accident enforcement in the area that would
put an additional burden on the Renton Police Department Traffic
Division. Thus, it is imperative that the entire roadway system for
both phase one and phase tto be built prior to any construction.
(2) Police Services
Since the initial questions were asked ', the police department in
regards to the impact of this development, several other projects
within the city have been started or completed. Due to these projects,
this development will have a major impact that cannot be adequately
handled without some mitigating measures such as: (1) all buildings
in the area be prewired for intrusion alarms; (2) exterior lighting
be placed so it shines in on the building rather than being placed
on the building shining outward. Exterior lighting, when placed on
the side of a building so that it shines outward blinds the police
officer who has to respond to the business during the hours of darkness.
(3) dead bolts installed on all doors; (4) large, easily readable
building numbers on all buildings; (5) no excavation work on Saturdays
or Sundays unless the contractor hires an offduty Renton Police officer
-50-
MEMORANDUM - Page 2
to monitor the overweight and tracking violations that are generated
from this type of operatio9.
(3) Noise
The department's concern on noise generated from this type project is in
two areas. (1) Construction Noise. The hours of construction should be
regulated from 7:00 am to 7:00 pm, Monday through Friday, 10:00 to 4:00
pm, Saturdays and Sundays. Further, the construction, workers should not
be allowed to play their stereo systems on the job site as they try to
have their stereo systems louder than the construction equipment, which
generates numerous complaints from residents in the area.And this particular
area will be a problem due to its closeness to Burlington Hill and the new
housing development being built behind Sears.(2) Railroad crossings should -
be of the new rubber type to reduce the amount of noise when cars and trucks
pass over the crossings late at night.
DRP:bf
-51-
Response to Comments from the City of Renton Police-Department
Comment Number: 1
It is acknowledged that much of the road system currently operates
at capacity. However, not all intersections nor all road sections
operate at this level. It is also acknowledged that there is likely
to be an increase in the number of accidents resulting from the in-.
••
creased traffic volume that would be generated by this and other
projects in the vicinity. While it is a general rule that the
traffic accident rate increases once a roadway operates at or beyond
capacity, the traffic accident history in the vicinity of the project
does not support this generalization. Based on several years of
traffic accident history data, the traffic accident rate has been
equal to or less than the rate of increase in traffic volume. The
creation of the road system west of the site is not expected to meas-
urably reduce the number of accidents that would occur as a result of
this project; rather, it. will simply shift the location of where
_ those accidents might occur.
As stated in the Traffic Analysis in Appendix B of the Final EIS,
because many of the intersections in the site vicinity currently
operate at capacity and because relatively little can be done to
increase the capacity of these intersections and/or freeway, there
will be several impacts associated with this or any new development
in Renton:
•Capacity conditions at key locations will extend
over longer periods of time such that hour-long
capacity conditions today may extend for more than
one hour in the future.
•People will seek alternative routes to avoid
congestion.
•Some people may shift their mode of travel to
transit or may choose to carpool, vanpool, or fleet
ride to and from work.
-52-
Recommended mitigations for congestion are described in the discussion
of "Vehicular Transportation Generated - Mitigating Measures," on
pages 7-8 and 81a of the Draft EIS. In addition, the following miti-
gation is hereby added to the list on pages 7 and 8 of the Final
EIS as follows:
•The City could encourage the use of alternative'
modes of transportation by installing paid parking
areas, reducing the parking supply, and designating
a portion of the lot for carpool use."
The developer shall provide an operational traffic analysis for each
phase of development when specific site plans are available.
As indicated on page 2 of the Traffic Analysis in Appendix B of
this Final EIS, during Phase 1 all project traffic .will enter and
exit via the Earlington Park development to the south. It is, there-
%
fore, not considered necessary to construct the complete roadway system
prior to construction of Phase 1 of the proposed development.
The developer will participate in street and intersection improvements, •
including the intersection of Monster Road and Sunset Boulevard,
Monster Road and the roadway to be constructed along the western peri-
meter of the Earlington Park development, paralleling the alignment
of the proposed Valley Parkway. There may be other traffic operation
improvements which may be made at some intersections in the vicinity of
the project. However, such detailed improvements can not be reliably
forecast because of the wide range of development potentials for the
project. Such detailed analysis will be provided at the time a more
specific proposal is developed. Please refer to the letter from Mr.
Richard Houghton, Renton Public Works Director, on the final page of.
this Final EIS.
-53-
•
Comment Number: 2
To reflect the concerns of the Police Department comment letter, the
lists of mitigations regarding police protection on pages 8-9 and
83-84 of the Draft EIS are hereby expanded to include the following:
". - All doors should be equipped with dead bolt locks.
- All buildings should be prewired for intrusion alarms.
- Indirect exterior building lighting should. be utilized.
- Large, easily-read numbers should be placed on all
buildings.
- No excavation work should be conducted on the weekends."
• Comment Number: 3
The suggested mitigations involving construction hours and rubber-
ized railroad crossings have been included already on pages 5 and
72-73 of the Draft EIS. To reflect the concerns of the Police
Department comment letter, the following mitigation is hereby added
to the lists on pages 5 and 73 of the Draft EIS:
" - The volume of radios and stereo systems utilized
by construction workers should be restricted to
a level which does not intrude upon nearby resid-
ential uses."
-53a-
WRITTEN COMMENTS FROM NEIGHBORHOOD RESIDENTS, COMMUNITY GROUPS,
AND OTHER INTERESTED PRIVATE PARTIES AND RESPONSES TO COMMENTS
,:. 1: .
V J t '
v
(:)4-:
bnFi i. 1 ;
9 &44d.... --- ieZeZi-i• ,.. --oce-e. -(/ ,
34,.
t . /� 4' _ ., t•L. p ��
/ l
•,u `� r; A`W10+4,1O.r C lt.r of National Audubon Society
Jr, fir+ 619 Joshua 6r..nuhdit�. •,.%fourth A Ind Pike St.. Seattle, Wash. 98101 •(206) 622-6695
• iItf M^S' -..� 1 : t
,-..)1
i \ ---'"~ . '~ April 28, 1981
e.s . t•
David Clements • �'/'/ r T `
Acting Planning Director .. .
City of Renton Planning Dept..
Municipal Building .
200 Mill Ave. So.
Renton, Wa. 98055
Dear Mr. Clements,
Thank you for the opportunity to comment on the DEIS for
the Black River Office Park. On behalf of Seattle Audubon,
I must say it was discouraging to see this document so soon
after Renton' s very commendable Wetlands Study, and its rec-
ommendations. More on this later in the letter.
The Black River Office Park DEIS is generally clearly
written and adequate in meeting SEPA guidelines, however, two il
parts of the statement should be strengthened. In the alter-
native section, alternative two of a lower intensity develop- f
ment is hardly analyzed at all. Certainly some pros and cons of .
such an alternative' development scheme should be addressed.
Secondly, the hydrologic analysis leaves many questions unan- _,
swered. . Where does' the water in the Black River forest come
from--overflow of the Black River channel-Springbrook Creek, 2
. . groundwater seepage, or gravity flow from Earlington Hill to the
1 north? What is the yearly or seasonal fluctuation of water
levels on various parts of the site? At the very least some —
site testing as included in Appendix B should have been dis-
cussed,. and such sites monit..red over several months ' time.
The property is an importnnt wetland which providers consider-
able flood storage, and the riparian forest species (notably
the Oregon Ash and Black Cottonwood) are dependent on high —
water levels for, most of the year.
Although the idea of leaving some of the site undisturbed
is a good one,; it is very unlikely such a small tract (13 acres) .
will survive as riparian forest. On page 19 of the Renton 3
Wetlands Study, it states, " . . .at least 40 acres of wetland in one
contiguous block would have to be retained in its natural con-
dition in order for. the riparian forest to continue as a func-
tioning habitat. " If a large part of the natural wetland is —
filled, then what remains will slowly but surely die off. To
preserve the uniqueness of the riparian forest,• the site itself
must be mostly preserved.
The proposed re-zone of the site to M-P would contradict
most of the natural, systems goals of the 1981 Renton Policy
1
-54-
2.
Element (see pp.19-2' in tn. EIS) . Furthermore, the Black
River woods were identified in the Renton Wetlands Study as
the number one wetland area for preservation. The woods have
a tremendous present value for flood storage and as a green- 4
belt or urban separator. They provide homes and resting
places for many wildlife species, and serve as a close-in
• "outdoor laboratory" for education and scientific study..
Surely greater Seattle will need more offices and busi- —
ness parks, but at what price? On page 102 the EIS preparers.
admit,,"Implementation of the proposed project will convert
the best remaining riparian forest in the Seattle area to a
warehousing/office park. " Surely alternative sites are avail-
able for such facilities at a lower environmental cost than I
the loss of the Black River Forest..
Please notify us of any public hearings about the re-zone
of this property, to my attention..
Sincerely yours,
J' d Marshall
Seattle Audubon Wetlands
Committee
i
;
I -
L_
-55-
' I
Response to Comments from the Seattle Audubon Society
•
Comment Number: 1
Comment noted. The discussion of the impacts of Alternative 2
on page 110 of the,Draft EIS in relation to those of the proposal
quantifies the differences between the two development options.
The major benefits ;of a less intensive alternative are enumer-
ated in the impacts discussion, whereas its major drawback in-
•
volves its economic infeasibility.
A modified alternative has been added to the Final EIS and is
discussed in the response to comment 21, letter from the King
County Department of Planning and Community Development, on
page 46a of the Final EIS.
Comment Number: 2
•
The consulting firm of Entranco Engineers has conducted a Drainage
Analysis, the results of which are included as Appendix D in this
document.. The local storm drainage patterns are detailed on page 7
of that report.
Comment Number: 3
Short-term retention of the site in its undeveloped state will be
addressed. as part of the rezone approval (see the response to comment
1, on page 14 of this document.) The City could also be constrained
from allowing development if the environment is determined to be signi-
ficantly adversely affected by such development. According to the City
of Renton Planning Department, long-term preservation of the site in its
natural state could provide the City an opportunity to purchase and/or
encourage dedication of portions of the property for public ownership
by the property owner.
•
-56-
1
Comment Number: 4
Comment noted. The proposed action, which would be consistent with
the land uses proposed to the south of the site, may be considered as •
"in-fill" growth in that it is located in close proximity to an urban
center. It is acknowledged, however, that about 1,000 acres in Renton
presently zoned for Manufacturing Park already.feature or are currently
developing street access and utilities necessary for industrial devel-
opment of this type. As stated on page 97 of the Draft EIS, the site
is unique as one of two sites in the Valley equipped with reciprocal
switching from two railroad lines without penalty to the shipper, in
most cases. The light warehousing use proposed for the site would
take advantage of this feature. Alternative rail-served sites also
exist in other South King County areas. (i.e. Tukwila, Kent, Auburn, etc) :
However, those sites- are not under the control of the project proponent.
-57-
r
•
GREEN RIVER STUDY GROUP P.O. Box 772, Kent, Wash. 98031 -';:.
-- +-�— May 26, 1981
Mr. navid Clemens, Acting Planning Director
City of Renton Planning Department
Municipal Building
200 Mill Avenue South
Renton, Washington 98055
I have reviewed the Black River Office Park DEIS •and I am primarily con-
cerned about the impact of this project on a unique wildlife habitat. I am
also concerned about the effects on traffic of this gevelopment and others
planned for this area.
The Black River Office Park is to be built on a 70 acre parcel that is
a unique example of a climax riparian forest. According to the City of Renton
Wetland Study (February, 1981), the Black River Forest is "the most valuable
wetland within the City".(Pg. 11) According to the DEIS (pg. 63) "this tract --
of wetland remains for both wildlife and plants an especially large, mature
and varied habitat, considering its urban location. As such, it is one of the
only habitats suitable for certain species in the Seattle metropolitan area."
Admittedly the proposed development will attempt to leave 22% of the native
vegetation in large areas, particularly along the Black River. But, according
to the informationon page 61 of the DEIS, the trees in this area areaall
shallow rooted and will not survive the soil compaction from heavy traffic or
paving. These trees areaalso susceptible to wind damage, and the thinning
and clearing during development will magnify the wind damage problem. It seems
clear that the efforts to mitigate the impacts of development on the Black
River Forest are of questionable effectiveness.
Any development on this site will destroy a unique and irreplaceable
habitat, and there is no way to mitigate its loss.
The impact of the area's transportation system is clearly negative.
The development will generate between 9,070 and 34,030 vehicles per day in
an area where the LOS is E to F at the present time. (At no point in this
DEIS did I see LOS ratings for the a 'fected arterials and intersections.
My information comes from the Earlington Park DEIS.) When the traffic from Z
this project is combined with that of other developments in the area, the
increase in truck and automobile traffic will be substantial. People will
surely seek alternative routes to avoid congestion, but the aternatives in
this area are few. Unfortunately, there is little that can realistically be
done to improve the capacity of efficiency of I-405, Grady Way, or Rainier
Avenue. The already severe congestion will get worse. -
-58-
•
•
Black River Rorest Office Park DEIS
Page 2
GREEN RIVER STUDY GROUP P.O. Box 772, Kent, Wash. 98031
•
Improvements to Monster Road are recommended as a way of mitigating
the traffic impacts. How Will these improvements be funded?
The Black River Forest is a unique, beautiful natural area. I urge
the City of Renton .to delay any development on this irreplaceable site
until methods of preserving this area can be explored. Since this site ?j
• is being considered as a regional priority in the proposed County bond
issue, it would be reasonable to preserve the area until the bond issue
can be decided.
Sincerely,
•
L (�
Carol Stoner -
11 t
.•
•
•
•
•
•
_
Response to Comments from the Green River Study Group
Comment Number: 1
Comments noted.
Comment Number: 2
These issues are discussed in an expanded traffic analysis, the
full text of which has been included in this document as Appendix
B. The congested levels of traffic flows in the site vicinity as
well as mitigations are detailed on pages 2 through 5 of that report.
An explanation of the proposed method of funding may be found in the
response to comment 2, letter from the Washington State Department
of Transportation, on page 25 of the Final EIS. See also the
response to comment 1, on page 52 of the Final EIS.
Comment Number: 3
Please refer to the response to comment 1, letter from the United
States Department of the Interior, on page 14 of the Final EIS.
-60-
ALHADEFF, LEAVITT, WESLEY & BOPP
ATTORNEYS AT LAW
ALAN C.ALHADEFF THIRD &BLANCHARD BUILDING TELEPHONE
GERALD L.BOPP 2184 THIRD AVENUE LO6 .682-e192
STEPHEN N.POWELL SEATTLE,WASHINGTON 98121
R.JOSEPH WESLEY
JON R.ZULAUF i
THOMAS E.LEAVITT
ON LEAVE May 28, 1981
ECUVE o
MAY 29 1981
Mr, . David Clemens
Acting Planning Director 9y ,���
City of Renton ti4NG DE.4
1 ' Planning Department
Municipal Building -
200 Mill Avenue
Renton, Washington 98055
Re: Black River Office Park Draft
Environmenta.) .' Impact Statement
Dear Mr. Clemens:
This letter will serve as the comments of our
client, the Duwamish Indian Tribe on the Black River Environ-
mental Draft Impact Statement.
Our client' s primary concern regarding the rezone
and ultimate development of the office park and rail-served
warehouse is the impact such use will have on the Indian
archaeological sites in that location. The assessment done
by the Office of Public Archaeology of the University of
Washington appended to the draft EIS is an excellent first
step toward proper protection of this property. It is our
position, however, that further studies need be done as
recommended by the Office of Public Archaeology prior to the
final EIS and, of course, prior- to the actual rezone.
Unless full information is obtained on this issue,
a final EIS would never be determined adequate under state
law.
The Washington Supreme Court has recognized the
adoption of the State Environmental Property Act (SEPA) as
"an attempt by the people to shape their future environment
by deliberation, not default. " Stempel v. Department of
Water Resources, 82 Wn.2d 109, 118, 508 P.2d 166 (1973) .
SEPA, therefore, "mandates governmental evaluation of environ-
mental factors when choices are still available" . Eastlake
Community Council v. Roanoke Assoc. , 82 Wn.2d 475, 496, 513
P. 2d 36 (1973) .
-61-
Mr. David Clemens
May 28, 1981
Page Two
C
Further stressing the importance and function of
this informational purpose, the Supreme Court has declared:
The clear mandate of SEPA, and the purpose
behind the environmental impact statement
requirement, is consideration of environmental
values based on full information before a
decision is made . . . one of the purposes
of this complete information requirement
is to help the agency decide what protective
conditions are needed.
Norway Hill v. King County Council, 87 Wn.2d 267, 279, 552
P.2d 674 (1976) (emphasis in original) .
We do not feel that a deferral of a full and MEW.
proper analysis of this impact until the construction stage
of this project is proper under the law. Case law in
Washington requires full assessment of known impacts at the
earliest stage possible. This rule is �m ently reasonable f.
in the instant case. The City has been asked to rezone the
entire site but it has the choice of rezoning just part of
the property (see p. ix of EIS) . Until the actual location
of archaeologiEir sites are known, the City cannot make a
reasoned decision about what part of the site should be left _
in its natural state.
The means for such further assessment - subsurface
coring - is available now, as acknowledged by the EIS. To
defer complete analysis would make the EIS inadequate and
any rezone decision improper.
While we focus on this particular impact, we
concur with those comments which we know you will receive
regarding the project's eft on the physical environment.
The removal of the riparian forest, displacement of a unique
wetland, and detrimental effects on groundwater and surface
water quality are all significant impacts of this project
which should be fully considered by the City before taking
this first step of rezoning.
Mr. David Clemens
May 28, 1981
Page Three
Finally, the Duwamish Tribe was not listed in the
Draft EIS as a recipient of the document. Please add them,
in care of this office, so that we may receive the final
EIS and notices of public hearings.
Thank you.
Sincerely,
ALHADEFF, LEAVITT, WESLEY & BOPP
r .7y/
By: „it„,,,r,
Ala4. A L def f
By: .--OWri-vX41-00.
Stephen R. Powell
SRP/ldf
cc: Ms. Linda Littrell,
Small Tribes of Western Washington (STOWW)
Ms. Cecile Maxwell, C :airperson, Duwamish Tribe
Ms. Lisa Steinbrueck
Office of Public Archaeology
-63-
JI
Response to Comments from Alhadeff, Leavitt, Wesley & Bopp
Comment Number: 1
As stated on page 96 of the Draft EIS, the proponent will authorize
a coring program prior to the commencement of construction activities.
If significant archaeological resources are discovered on the site,
conditions of either the rezone or future development may require
protection of these resources through alternative site design or
retention as open space until excavation of such resources can be
completed. Please also refer to the response letter from the Washing-
ton State OFfice of Archaeology and Historic Preservation, on page 70 of this document.
11
--I
I
I j
`I
-64-
City of Renton Planning Dept. • z,- � May 27, 1981
200 Mill Ave. S. Box 161
Renton, Wash. 98055 `, ;; Renton, Wash.
'N ,o `/ 98055
/
,
Subject: EIS Proposed Black River Office Park
I have read the EIS for the proposed Black River Office Park and believe
that any benefits that the public might derive from this project are far out-
numbered by the adverse impacts which are certain to occur. The mitigation
outlined in the EIS does not show that the environmental damage can be re-
duced to an acceptable level. That was the conclusion of the traffic analysis
(D-8) as well as the vegetation and bird report (C-3) and the comments from the
Renton Fire Marshall (D-5),.
Only Alternative 3 will retain riparian forest habitat in an amount large
enough to afford significant protection of its unique qualities and this altern •
-
ative was given little discussion.. Acquisition of this property for a public
park was dismissed as unlikely, however, that remains a very viable option.
The uniqueness of the Black River forest is well-recognized and the fact that
the site remains high on a list of priority projects for a proposed County Parks
and Open Space bond issue should not be ignored; nor have other funding altern-
atives been thoroughly explored.
The recent Renton Wetlands Study indicates that a minimum of 40 contiguous
acres of wetland must be preserved in order for the riparian forest to retain its
current habitat functions o The EIS fails to relate the probable long-term im-
pacts of partial development, whatever the scale, on the ability of any preserved
areas of forest to survive. Recommendations on page C-3 seem to conflict with
those of the soil report which indicate that extensive filling and an extensive
surface water and ground water drainage system will be necessary.
The issue of water quality is licitly considerede.and cannot be isolated
from that of adjacent projects, as yet uncompleted, whose runoff will also be 3
directed into the Black River channel. The ability of the small wetland area
to accept and adequately treat an unlimited volume of runoff must not be assumed. _
The potential revenues to the City were cited as an economic benefit but no
figures presented to show how these might offset added public costs necessitated 4
by development of this land. Is there certain funding for the major road im-
provements that are discussed? Will police and fire safety be reduced in other.
areas of the City?
How might the proposed westerly access to this development for mitigation 5
of some traffic impacts affect preservation of the western half of the site should
alternative 2 be chosen?
There seems to be general agreement among the various governmental bodies
that a buffer zone of 200 feet is needed to afford some protection to a river Co
environment. What is the justification for this proposal's setback of 50 feet
along the Black River channel?
-65-
Page 2 EIS response
There continues to be an abundance of undeveloped valley land which is
already properly zoned for industrial purposes and where improvements, includ-
ing rail, already exist. The demand for rail-served warehousing can be full- -7
filled elsewhere and, in fact, is planned elsewhere including a site adjacent
to the subject property. These sites sho9ld be utilized before additional lands
are rezoned for the same purpose.
The City's Land Use Comprehensive plan dates back to the 1960fs. Since
then there have been several studies of the Black River forest which indicated
its unique features as an environmentally sensitive and historical area, a fact g
not earlier recognized. The new Plan revisions proposed by the Planning Com-
mission for this general vicinity indicate that reduced density of development
and additional greenbelt area may be more appropriate.
The BIS accurately notes that this proposed rezone represents a signifi-
cant change in land use--replacement of one-of-a-kind old growth riparian forest
with an office park/warehouse complex now increasingly familiar in our valley.
Perhaps no other area remains on the valley floor where such a rezone could
effect such a profound alteration of the environment. Attempts to preserve a
portion of this sensitive forest habitat are not guaranteed of success. The
balance of development and preservation of open space that is sought is best
achieved by allowing this property to remain a part of the open space network
proposed for the valley floor.
Sincerely,
Lauri Johnsen
.11
J• -
r.1
-66-
Response to Comments from Lauri Johnsen
Comment Number: 1
Please refer to the response to comment 1, letter from the United
States Department of the Interior, on page 14 of the Final EIS.
Comment Number: 2
The discussion of "Flora - Impacts," on page 63 of the Draft EIS,
which is condensed from the full discussion on page C-3 of Appendix
C, does acknowledge the risk of partial development on the remainder
of the riparian forest. It is .noted that gradual losses and elim-
ination of certain plants and species would likely occur.
Comment Number: 3
The issue of water quality and wetland treatment for this and other
proposed development in the immediate vicinity of the subject site
has been addressed in the Water Quality Impact Assessment completed
by the consulting firm of Entranco Engineers. The full text of that
analysis has been included in this document as Appendix A. As dis-
cussed on page A-3 of that report, the use of oil/water separators,
in conjunction with the proposed wetland treatment, gabion structures,
and frequent street cleaning, should result in sufficient water qual-
ity treatment so that no, discernable degradation should occur 'to •
Springbrook Creek.
Comment Number: 4
Please refer to the response to comment 2, letter from the Washington
State Department of Transportation, on page 25 of the Final EIS for
a discussion of the, proposed method of. funding transportation improve-
ments. Refer, also, to the added mitigation to offset fire protection
impacts, stated as the response to comment 1, letter from the City of
Renton Fire Marshall, on page 49 of the Final EIS. In addition,
-67-
Comment Number: 4, continued.
several mitigations have been added in response to comment 2, letter
from the City of Renton Police Department ( on page 53a of this docu-
ment) , intended to reduce potential impacts on police protection
services.
Comment Number: 5
It is acknowledged that the mitigating measure to build a roadway
connection to Monster Road would have some impacts on the preservation
of vegetation on the western half of the site, since either a direct
connection to Monster Road or the extension of the roadway along the
west side of Earlington Park would need to cross certain drainage areas
and would temporarily disrupt the flow of water to vegetation in this
area. The extension of roadways and utilities into the westerly portion
of this site could also precipitate future development in these areas,
thus reducing the size and value of the remaining riparian forest.
Comment Number: 6
As stated on page 43 of the Draft EIS, the Washington State Shoreline
Management Act applies to the areas 200 feet from either side of the
Black River Channel, measured from the ordinary high water mark. The
SMA regulations restrict the type of development permissible within
certain distances from designated water bodies. However, they do not
prohibit development within 200 feet of the Black River Channel. The
rezone approval, Substantial Development permit (SMA regulations) and
site development permit can be conditioned upon preservation of vege-
tative buffers adjoining the Black River Channel.
Comment Number: 7
The proposed action, which would be consistent with the land uses pro- (.
posed to the south of the site, may be considered as "in-fill" growth
in that it is located in close proximity to an urban center. It is
acknowledged, however, that about 1,000 acres in Renton presently zoned
for Manufacturing Park already feature or are currently developing street
-68-
Comment Number: 7, continued.
access and utilities necessary for industrial development of this type.
As stated on page 97 of the Draft EIS, the site is unique as one of two
sites in the Valley equipped with reciprocal switching from two railroad
lines without penalty to the shipper, in most cases. The light ware-
housing pse proposed for the site would take advantage of this feature.
Comment Number: 8
Please refer to the response to comment 8, letter from the U.S.D.A.
Soil Coservation District, on page 11 of the Final EIS for a discussion
of the City of Renton Wetlands Report. The study has been accepted as
a technical document and is awaiting review by the Planning Commission.
It has not been adopted as policy by the City Council.
As noted in the Draft EIS on pages 19 - 42, the proposal is consistent
with the City of Renton Comprehensive Plan Map. However., the proposed
development is not in conformance with policies regarding the natural
environment (i.e. wetlands, flora, fauna, and open space) . This EIS has
disclosed the relationship of the proposed rezone to applicable goals,
policies and objectives of the Renton Comprehensive Plan, as well as other
applicable laws,, policies and plans.
-69-
LETTERS NOT REQUIRING RESPONSES
:Il ill,.• I.''.:
it.WIN SPIT L(V1AN ' `' ►ACOB THO.\AS
Governor ,n.„ • Director
STATE OF WASHINGTON
OFFICE OF ARCHAEOLOGY AND HISTORIC PRESERVATION
111 West Twenty-First Avenue,tit-11 • Olympia, Washington 98504 • (206)753-4011
•
•
May 27, 1981
Mr. David Clemens
Acting. Planning Director
City of Renton Planning Dept.
Municipal Building
200 Mill Avenue South •
Renton, WA 98055
Log' Reference: 155-C-KI-06
•
Re: Black River Industrial Park DEIS
•
Dear Mr. Clemens: •
A staff review has been completed of your draft environmental impact state-
ment. The document exhihits a well considered concern for the cultural
environment. We note your commitm.:r.t to identify, preserve, and protect
cultural resources which are known. or anticipated to be present in the
project area. . . .
Please accept our, sincere' appreciation for your commendable efforts to
protect our cultural heritage.
Sincerely,
SheiTa
• Archaeologist
db •
•
•
—703
J •
011 .
•
"-'.,`'o Seattle-King County/DEPARTMENT OR PUBLIC HEALTH
2'Sice 400 Yesler Way Seattle, Washington 98104 (206) 625-2161
JESSE W.TAPP, M.D., M.P.H. •
Director of Public Health ; • .
.
May 4, 1981
I •
The City of Renton
Municipal Building
200 Mill Avenue South
Renton, Washington 98055
Attn: David R. Clemens
Dear Mr. Clemens:
Re: Draft Environmental Impact Statement
.Black River Office Park Rezone
This department has reviewed the above draft environmental impact
statement and does not foresee any significant adverse effect on the
environment as a result of the project.
Very trulyc:::: o ----- ;.
yours,
y ;•)../5..;•eAdr...:....
n P. Nordin
Chief, Environmental Health Services
•
®I:m1a.
_- i 11 „r'll`h `�1
( (.1 1'::1.rill/Pp
O
' 7.. -".''''''''''''''. ,A. /
DISTRICT SERVICE CENTERS: .
CENTRAL NORTH EAST SOUTHEAST SOUTHWEST
' ' Public Safety Building 10501 Meridian Ave.N. ' 2424-156th Ave.N.E. 3001 N.E.4th SL 10821 8th Ave.S.W.
Seattle 98104 Seattle 98133 Bellevue 98007 Renton 98055 Seattle 98146
625-2571 363-4765 885-1278 228.2620 244-6400
—71—
'�t:l(:CtL�tS-:
• 1)(.'.1 1i'% :ti.'•is. O �J�'�4l;riniction anti'Land Use ;'p
William J.Justen, P.E, Director
Charles Royer,Mayor May 14, 1981
•
. Mr. Dave Clemens
Acting Planning Director
City of Renton Planning Department
Renton, Washington 98055
Dear Mr. Clemens:
We appreciate the opportunity to review the Black River Office Park
DEIS. The City has no comments on this proposal.
• Very truly yours,
WILLIAM J.. JUSTEN, P.E., Director
kiC aAU' atek2A-44
By: DIANE' L. ALTHAUS
Environmental Specialist
•
DLA:mr •
t.11 i •
i ' D O
r
tisl rf 1 ?vVi •
----------.............
.
,�1
•
•
An equal employment opportunity-affirmative action employer.
Seattle Department of Construction and Land Use.503 Municipal Building,Seattle.Washington 98104
nn
APPENDICES
A. Black River Office Park Water Quality Impact Assessment
B. Black River Office Park Expanded Traffic Analysis
C. Correspondence from the Renton Public Works Director
D. Black River Office Park Drainage Analysis Supplement
APPENDIX A
EFFECTS ON COMBINED WETLAND TREATMENT OF
STORM RUNOFF DISCHARGE FROM BLACK RIVER OFFICE PARK,
EARLINGTON PARK, AND EARLINGTON WOODS
INTRODUCTION
1I ,
The information provided in this report is in response to comments received
on the Draft Environmental Impact Statement for Black River Office Park. The
lead agency, the City of Renton, requested the project sponsor, Alterra
Corporation, provide additional information on the water quality impacts
attributable to the project. Specifically, the Environmental Review
Committee requested additional study regarding the ". . .ability of the Black
River channel to handle runoff from this project in light of Earlington Park
and other developments in the vicinity while maintaining a 'wetland
treatment' ."
DESCRIPTION OF ANALYSIS
In the Earlington Park Water Quality Impact Assessment (Entranco, 1981) , it
was determined that the old Black River channel could provide sufficient
wetland treatment for stormwater runoff from Earlington Park and Earlington
Industrial Park for a one-year storm. To determine the impact of runoff from
the Black River Office Park development, runoff from the total area
discharging into the Black River channel was calculated to determine the
effect of combined discharge on wetland treatment. The total drainage area
includes Earlington Park, Black River Office Park, Earlington Woods PUD, and
a portion of the hillside north of the Black River Office Park. The total
drainage area for specific land uses was calculated and runoff coefficients
were determined. The peak runoff rate was then calculated using the rational
method. The total peak runoff for a one-year storm for proposed (post-
development) land use conditions was determined to be 110 cfs.
1
. l
SUMMARY OF EARLINGTON PARK WATER QUALITY IMPACT ASSESSMENT
The existing water, quality in the Black River watershed and the impacts of
stormwater runoff and mitigative measures have been thoroughly analyzed and
discussed in the Earlington Park Water Quality Impact Assessment by Entranco
Engineers. (A copy of the assessment is included by reference. ) The
following conclusions can be drawn from the Entranco report:
- 1 . Existing water quality in Springbrook Creek is relatively poor and only
slightly better than typical stormwater runoff quality. Springbrook
Creek exceeds water quality standards for dissolved oxygen, total
• coliforms, nitrate, ammonia, and phosphorus.
J
2. Existing poor water quality in Springbrook Creek is attributable to 1
stormwater discharge from existing commercial , industrial , and
residential land uses upstream in the watershed.
3. The existing old Black River channel is providing wetland treatment
(physical , chemical , and biological removal of pollutants); for stormwater
discharging from the existing 60-inch storm sewer outfall . The
concentration of most pollutants is lower in wetland-treated runoff than —'
in Springbrook Creek.
4. The quality of wetlands in the old Black River channel has been degraded
by the present discharge of storm runoff. Most notable are accumulations
of floating oil and grease and other debris.
5. Under existing conditions, the old Black River channel possesses little,
if any, value as fish rearing or spawning habitat. Downstream and
adjacent upstream segments of Springbrook Creek similarly provide little
or no value as spawning and/or rearing habitat for anadromous fish jam,
species and are therefore of value only for anadromous fish passage.
Other system characteristics, particularly the P-1 pump station, are
likely to be more limiting to fish passage than water quality.
2
6. Previous work by Entr::Anco Engineers and others has demonstrated that
significant fractions (60 to 95 percent) of stormwater pollutants are
contained in suspended and settleable forms that are potentially
treatable by sedimentation.
7 . Use of the old Black' River channel wetlands would provide sedimentation
treatment as well asjchemical and biological removal of stormwater
pollutants from existing and post-development runoff (Earlington Park and
Earlington Industrial Park) from stormflows equal to or less than the
estimated annual discharge rate of 45 (cubic feet per second) cfs. APWA
criteria for sedimentation basin design indicate that 2,030 square feet
of sedimentation area are required for each cfs of stormwater discharge
to remove particles ;(and associated pollutants) of 10 microns and larger.
The old Black River 'channel occupies 97,500 square feet of surface area
and actually exceeds1 the surface area (91,350 square feet) necessary to
provide the proposed level of, treatment.
8. Gabions should be installed in the old Black River channel to: (a)
provide dead storage; (b) increase surface area of wetland contact;
(c) reduce hydraulic; scouring during storm events; (d) provide for
primary sedimentation separation; and (e) provide for accidental spill
control .
9. The provision of wetland treatment as proposed, in conjunction with oil
and grease separators and periodic street sweeping, should result in
sufficient water quality treatment such that no significant impacts to
Springbrook Creek will occur. The basis for this conclusion is derived
from the fact that: (a) Springbrook Creek water quality is already very
poor; (b) the post-development discharge from the project site will
represent less than 6 percent of flow in- Springbrook Creek; and
(c) wetland treatment is expected to provide water quality superior to
water quality in Springbrook Creek.
3
The following assumptions and limitations should be considered 'in reviewing
this water quality impact analysis:
i
1 . According to DOE water quality regulations, existing water quality
represents the water quality standard in those circumstances where
existing water quality exceeds the designated water quality standard.
2. DOE water quality regulations contain a provision for nondegradation of
existing water quality.
3. It is assumed that design criteria for water quality treatment facilities
can be limited to consideration of the annual discharge rate and that it
is reasonable not to provide the same high level of treatment for larger
storms of lesser frequency (5-, 10-, 25-, 50-, and 100-year, design
storms) . In this respect, water quality design criteria are intended to
provide treatment for the majority of storm volume and not for maximum I i
discharge rate.
4. It is possible that pollutants that accumulate during periods of low flow.
(annual discharge rate and lower flows) may be flushed from the system
during periods of high flow (storm flows exceeding annual discharge
rate) . Provisions of gabions and dead storage, and the presence of
wetland vegetation, should substantially reduce the probability of such
flushing.
5. It is essential that all runoff be discharged to the upstream end of the
old Black River channel .
4
INFLUENCE ON WETLAND TREATMENT OF ADDITIONAL RUNOFF FROM BLACK RIVER OFFICE
PARK AND EARLINGTON WOODS PUD
As indicated above, the combined post-development runoff from the Black River
Office Park, Earlington Woods PUD, Earlington Park, and Earlington Industrial
Park has been estimated at 110 cfs for a one-year storm.
The old Black River channel provides approximately 90,000 square feet of
wetland treatment area. As shown in Figure 1, this wetland area will remove
all particles approximately 16 microns in diameter or greater for the design
discharge rate of 110 cfs. Treatment for smaller streamflows will be greater
and will remove particles smaller than 16 microns.
Entranco Engineers (1980) has reported that significant quantities of most
stormwater pollutants are contained in the suspended and settleable solids
fractions. These data provide the rationale for physical stormwater
treatment and indicate that as much as 60 to 95 percent of stormwater
pollutants can be treated by physical removal of suspended and settleable
solids. In a study of street surface runoff (Sarter, 1975) , it was found
that, with the exception of phosphorus and nitrogen, 70 percent of the
pollutants measured (total solids, volatile solids, biochemical oxygen
demand, chemical oxygen demand, Kjeldahl nitrogen, nitrates, phosphates,
total heavy metals, and total pesticides) were contained in particles 43
microns in diameter and larger (44 percent for phosphates) . Therefore, the
treatment available in the old Black River channel is 'sufficient to remove
more than 70 percent of most pollutants.
Ongoing research being carried out by the University of Washington includes
observations supporting the wetland treatment concept (1981) . Although the
final report has not been published, preliminary results suggest that a
grass-lined channel 60 meters (197 feet) long will remove 80 to 100 percent
of the initial lead concentration; the results for zinc, total suspended
solids, and chemical oxygen demand demonstrate similar tendencies.
5
104X ;_ .. . /
'
• .
•
j
i
•
......:.:. ....i. '
I
-,t
_
• I
S
i.
�..._..... ... .... .'..... ._., f'
i'
•
•
•
103X • .. . — _ .-..... - _ - -• _ .- -
i
•
CI
.. ... _ - 1
...... ..::::
�._.. .._ _. ::_.
W • _
CO
,
._ ...-- --. `r:c' - : '— c _ 'i-t .I - - - - - is•
-m 1. _ .- -- — 7_.,,_.1 - ' I " ;_ _. . ' ' .,._ . _ f I , _I-.
� •�.— r
11OCFS :.' • - •' .
l:•_. i :. I:. i1
"_ 'j'.:,,� � i 11 l 1' ti .I ;j•�: 1
1:
1 T
,` '1 '
:f-: ' - :-
. F - - -- : : - -- - - t -. -- - - -- - i ..
a: : is t '. T.'l-- ..i'• 'I
I.
4' -
i
1
i"
i • 'r l
.I
1
f
ii
I--t ._r, i. ;I, ;•, ;1,•,-_i: .ILIA.-, ' 1 ,_. •
.. . ._ 'I; -I: 1.. ••i.;• _ .f. .,• ...I :• ; .. I.
1_ _1_--I--I-
I I•_ II iA I. i !: ' i ! • ' :I .•• II :I I• I f ''. • i
i_ . .---'- -. i.: is L is ,..:... t
1
10 X 1 I—X"101 :•_ . . .•'-J. ... - • - X102 - .. 1 r. i,X103.
PARTICLE DIAMETER -
•
MICRONS .
FIGURE 1
SEDIMENT REMOVAL PER TOTAL CFS •
FOR 90,000 S.F. AREA
APWA (1974) CRITERIA .
i
All of these studies support the adequacy of the old Black River channel to
provide a high degree of water quality, treatment for the combined stormwater
runoff from existing and proposed projects in the vicinity.
EFFECT OF THE P-1 DETENTION BASIN
The preliminary design of the Earlington Park storage pond (January 21, 1981)
by the Soil Conservation Service shows the old Black River channel included
in the. total area. of the storage pond. If this. design is used for
construction, much of the old Black River channel would be eliminated and
would no longer be available for wetland treatment. Although the storage
pond itself would provide sedimentation treatment, this treatment would not
occur prior to discharge into' Springbrook Creek. However, as shown in the
• water quality assessment for Earlington Park (Entranco, 1980) ,. the existing
quality of Springbrook Creek is only slightly better than anticipated runoff
• quality, and it is doubtful that post-development runoff will result in any
measurable increases in 'the pollutant concentrations in Springbrook Creek.
CONCLUSION
The old Black River channel is of sufficient area and length to be able to
• provide adequate wetland treatment for the stormwater runoff from the Black
River Office Park and the other developments in the vicinity. This
conclusion assumes the installation of. gabion structures and implementation
of supporting mitigative, measures as proposed in the Earlington Park Water
Quality Impact Assessment (Entranco Engineers, 1980) , and the Black River
Office Park Draft EIS (R!.W. Thorpe & Associates, 1981) . Discharge of all
runoff to the upper terminus of the old Black River channel would also be
required.
•
•
LIST OF REFERENCES .
American Public Works Association, 1974. Practices in Detention of Urban
Stormwater Runoff. Special Report No. 43.
Entranco Engineers, Inc. , 1980. Restoration Analysis of Wapato Lake, Tacoma,
Washington. An Evaluation of Dilution and Stormwater Control as Urban
Restoration Techniques.
Entranco Engineers, Inc. , 1980. Earlington Park Water Quality Impact
Assessment. Prepared for First City Equities.
Environmental Protection Agency, 1972. Water Pollution Aspects of Street
Surface Contaminants.
Thorpe, R.W. and Associates, 1981. Draft Environmental Impact Statement for
Black River Office Park. Prepared for the City of Renton, Washington.
Thorpe, R.W. and Associates, 1980. Draft Environmental Impact Statement for
Earlington Park. Prepared for the City of Renton, Washington.
University of Washington, 1981. Highway Runoff Water Quality Report #13.
Prepared for the Washington State Department of Transportation Highway Runoff
Water Quality Research Project..
8
APPENDIX B
The
Transportation Engineering & Planning Consultants TRANSPO
November 20, 1981 Gr®Vp
Ms. Deborah Krouse
R. W. Thorpe and Associates
815 Seattle Tower
Third & University
Seattle, WA 98101
SUBJECT: BLACK RIVER REZONE
Dear Ms. Krouse:
Thank you for asking The TRANSPO Group to expand on our preliminary
assessment of traffic conditions associated with the proposed Black
River Rezone. This letter presents an estimate of the daily and eve-
ping peak hour trip generation, a general estimate of travel distribution
_ and and traffic assignment, a summary of anticipated traffic problems or
concerns, and a list of reasonable mitigating measures. This letter also
responds to comments on the Draft Environmental Impact Statement (DEIS).
We have duplicated much of the information contained in our March 29, 1981
preliminary assessment to avoid cross-referencing of information and to
help readers unfamiliar with the background leading to the final environ-
mental impact statement a more complete understanding of the traffic issues.
We might also mention that in preparing this analysis, we met with Mr. Gary
Norris, Traffic Engineer, and Mr. Dick Houghton, Acting Director of Public
Works to discuss the specific level of detail that would be required in
this analysis. We all concluded that the description of the development
proposal as expressed in the rezone application was too general for detailed
traffic operations analysis to be meaningful . Thus, we agreed that this
general analysis was more appropriate and at such time as a specific project
proposal is defined, a more detailed traffic analysis would need to be
prepared by the project sponsor. Subsequent to this meeting I spoke with
Mr. David Clements, Acting Planning Director. He indicated that he needed
some traffic assignment information in order to estimate air quality impacts.
Project Description
This analysis is based on the site plan and project description which was
provided by your office. From this information, we understand the project
will include about 35.58 acres of office development and about 12.09 acres
of warehousing. The warehousing is proposed to be served by rail The
offices could be one or two stories in height, depending on the market for
office space at the time the buildings are being designed. We understand
the project is proposed to be constructed in two phases with access to
Phase I provided by a single road that connects to the road system that •
serves the proposed Earlington Park development. The second phase, on the
Twenty-three 148th Avenue Southeast •Bellevue,Washington 98007•(206) 641-3881
Ms. Deborah Krouse
The
November 20, 1981 TRANSPO
Page 2
ghrOW
western portion of the site, will connect with the Phase I road system
and plans a secondary access to Monster Road across the P-1 drainage
channel .
Trip Generation
Trip generation estimates (number of cars in and out of the development)
were made using a range of assumptions regarding possible building designs
and functions (e.g, one-story or two-story office buildings; office park;
or general office development, etc. ) The Institute of Transportation
Engineers Trip Generation Manual , 1979 and Arizona DOT Trip Generation
Intensity Factors, 1980 were the sources of trip generation rate information
(trips per 1000 square feet) . Applying these trip generation rates to
the proposed development, it was found that this development could generate
between 9,070 and 34,030 vehicles per day (vpd) . The evening peak hour for
the warehousing portion of the project generally falls slightly before the
traditional 4:30 to 5:30 PM evening peak hour. Nonetheless, because the
office development will comprise the majority of this proposal , a 4:30 to
5:30 PM time period was used as part of this analysis. Combined office and
warehouse uses are forecasted to generate between 1,250 and 3,970 vehicles
per hour (vph) .
Trip Distribution and Assignment
The travel distribution for a development like tie Black River Office Park ' -,
is largely based on the distribution of populate since a majority of the
trips to and from an employment center start or end at the employee's home.
This distribution needs to be tempered by other travel patterns like those
associated with general business activity (e.g. , sales) and service and
delivery activities. During Phase I , all traffic will enter and exit via
the Earlington Park development. The majority of this traffic is expected
to travel along 7th Avenue to Rainier Avenue and Lind Avenue SW (about 70
percent) , while the remainder will use Powell Avenue to gain access to
Grady Way. As the access road along the alignment of Valley Parkway is
built, this route will also be used by traffic just for the valley area to
the south. Because construction of this road is dependent on the action of
another developer, no traffic was assigned to this route.
Figure 1 shows the travel assignment that is expected to occur after full
development, assuming that connection with Monster Road is provided. It
can be seen that a large proportion of the traffic (about 25 percent) will
be using Monster Road to Sunset Boulevard where it will split with approxi-
mately 15 percent traveling north to nearby residential areas and to connect
with I-5. The remainder will follow Sunset Boulevard east to Rainier Avenue
where traffic will split with some continuing on east and the remainder
turning north on Rainier Avenue. The majority of traffic destined to the
south will continue to use 7th Street, Rainier Avenue, Powell Avenue and
Lind Avenue, and Grady Way as primary access routes. This assignment
The
Ms. Deborah Krouse TRANSPO
November 20, 1981
Page 3 GrOVp
reflects both daily and PM peak travel patterns. During the midday, I-405
and other major arteries are less congested than during the PM peak hour
so the traffic distributions for each are slightly different. Thus, during
the peak hour, travel on minor roads and on routes that may appear to be
out of direction is to avoid the congestion on more major, direct routes.
Like the trip generation, the travel assignment shown depicts ranges of
travel volumes that could potentially use the roadway system. The project
enerated traffic volumes are added to estimated 1984 traffic volumes
volumes without Black River Office Park) . This shows that Sunset Boulevard
east of Monster Road could carry between 2,800 and 6,600 vpd and between
400 and 950 vph during the PM peak hour. Rainier Avenue S south of Grady
Way could potentially serve between 66,780 and 76,750 vpd and 6,610 to
7,400 vph during the evening rush hour. Grady Way west of Powell Street is
forecasted to carry between 13,490 and 18,400 vpd and 6,160 to 7,400 vph
during the evening peak hour.
Impacts
As you know, a display of traffic volumes alone does not give a true impres-
sion of the impacts that would be created from traffic generated by a new
development. Rather, traffic volumes must be examined in the context of
many factors including, the street and intersection design, traffic control ,
and characteristics of the traffic flow. Techniques have been developed to
incorporate these factors and are called level of service analysis. In
urban areas these levels of service are measured at intersections. Unfor-
tunately, the range of volumes that could be generated by this project is
too broad to give meaningful results.
Nonetheless, it is important for the City to have some feeling for the impacts
that might be created.. To provide a point of reference, along Rainier Avenue
the street is now or will be (before this project is built) operating at
capacity (LOS E) . Likewise, some of the major intersections along Grady Way
are at or near capacity. Sunset Boulevard, except for the intersection at
Rainier Avenue operates above capacity (approximately LOS C) . There is some
potential relief to these capacity problems with the construction of Valley
Parkway. While this and other improvements like widening of Grady Way will
result in some relief to the local street system, the primary traffic arteries
like I-405 and Rainier, Avenue will continue to operate at capacity.
Thus, even if the majority of the traffic generated by this proposal travels
on routes that operate below capacity much of the volume will ultimately
travel through one or more of the intersections or on a road that presently
operates at capacity. As a consequence, the congestion during peak hours
will become more severe resulting in more delay, assuming all drivers attempt
to make their trip during the peak hour. In the last several years, other
cities have experienced some of the same levels of congestion problems that
now exist in Renton. Drivers have responded by modifying their travel habits
to avoid this congestion by:
The
Ms. Deborah Krouse
November 20, 1981 unIANSM
Page 4 er0\ip
• Changing the time they travel to and from work. This does not
eliminate traffic but it spreads the peak hour over a longer period
resulting in capacity conditions that may extend longer than one
hour.
• Change from driving alone to carpooling.
• Change mode to use transit.
The intersection of Monster Road and Sunset Boulevard should be upgraded to
serve the increased volume and it is expected that the signal should be set
into full operation in contrast to the present flashing operation. While
Sunset Boulevard carries a relatively high volume of traffic, this inter-
section is expected to operate at about LOS C or LOS D in 1984 with this
project. Even though Sunset Boulevard is less congested than some other
arterials, it does not provide a direct connection to a majority of desti-
nations and it eventually intersects with more congested arterials. Thus,
any advantage that can be achieved through using Sunset Boulevard as a bypass
is offset by the out of direction travel and down stream congestion problems.
As 'a consequence, Sunset Boulevard is not forecasted to be used to the extent
that might appear appropriate at a first, cursory review.
Following occupancy of Phase II , the street that would experience the largest
proportional increase in traffic would be Monster Road. This road is pres-
ently a very narrow winding road and has a moderate grade south of Sunset
Boulevard, and has not been built to carry all of the volume that is likely
to be generated by this project. The increased volume in combination with
the substandard design of the road would probably contribute to an increase
in the accident rate.
In the evaluation of these impacts, it is very important to recognize that
any new development in the City of Renton is going to have some individual
or cumulative impact on the major streets in the vicinity of this project.
Thus, the only way to ensure congestion levels will remain the same as they
are today is to stop any and all new development or redevelopment that will
add traffic to the street system.
Mitigating Measures
As discussed before, congestion will get worse or extend over longer time
periods when this project is developed. Roads like Rainier Avenue and I-405 } }
cannot be widened to increase their capacity so the impacts on these routes
will be difficult to mitigate by applying traditional road construction
solutions. Some road improvements that can be made include the upgrading
of Monster Road to improve both horizontal and vertical alignment to eliminate I
line of sight restrictions, and enhance safety. Because of the proposed
The
Ms. Deborah Krouse TRIANSPO
November 20, 1981
Page 5 Gr®Vp
construction of a road along the western edge of Earl.ington Park (along
the alignment of the proposed Valley Parkway) , it is suggested that im-
provements to Monster' Road north of Earlington Park match with this road
and extend north to the Sunset Boulevard. In addition, the Monster Road
intersection with Sunset Boulevard should be examined at the time a more
specific development proposal is proposed and any project-related channeli-
zation or signalization improvements (e.g. , vehicle detection) that are
warranted be made.
There may be other traffic operations improvements that can be made at
' some intersections in the project vicinity but as noted earlier, such
detailed improvements cannot be reliably forecast because of the wide range
of development potentials for this project. Such a detailed analysis may
be appropriate at the time a more specific proposal is developed.
While the potential for physical construction solutions to solve problems
is limited, there are a number of policy and program improvements that can
be effective in reducing or eliminating impacts. These include the following:
• Establish a new bus route or modify an existing bus route to
pass through the project.
• If bus service is modified to be convenient, provide subsidy of
bus passes asia company or office park benefit.
• Office park management should advise tenants and their employees
of the advantages of fleet ride, vanpool and carpool programs
through a package of information provided at initial occupancy
for each tenant and coordinated through the Seattle-King County
Commuter Pool agency. Office park management should also schedule
public information meetings for employers and employees.
• As much as practical , office park management should encourage
employers to initiate a flextime work schedule so peak period
traffic can be distributed more evenly over the 3:30 to 5:30 PM
peak period, and thus have less impact on the already congested
road system.
• As an inducement to achieve these objectives, the City may want
to consider limiting the number of required parking spaces to less
than is currently prescribed by code to discourage the use of
the single occupant vehicle. Another, less rigorous approach is
to reserve a portion of the parking spaces for carpools. Because
carpool incentives have not played a large role in the development
of new employment centers, it is suggested that about 5 percent of
the total number of parking spaces be reserved and that the Seattle-
,
The
Ms. Deborah Krouse IT' a N ST
November 20, 1981
Page 6 rovp
King County Commuter Pool monitor their use and increase the
percentage of reserved spaces when use reaches 80 percent
occupancy.
Many persons believe these policies are not as effective as physical solutions.
Yet in this region in cities like Seattle and Bellevue where traffic volumes
have reached capacity congestion levels, these types of policies have had
a substantial impact on maintaining or decreasing the rate of increase of
traffic growth. To illustrate the effectiveness of these policies, an in-
crease of the average vehicle occupancy from 1.1 persons per vehicle to 1.25
persons per vehicle represents an enhanced level of service from LOS E
(capacity) to LOS D. In a community like Renton where much of the employment
is concentrated along several major employers, policies to encourage ride-
sharing are increased.
Response to Comments
In addition to the above analysis we have been asked to respond to several
of the comments that the City of Renton received on the DEIS. The following
summarizes these responses. �l
Renton Planning Staff - (June 8, 1981)
In response to the desire for detailed traffic analysis, we met with the
Director of Public Works and the City of Renton Traffic Engineer and it was
determined that a detailed traffic analysis is not appropriate for this
proposed rezone EIS since the very general nature of the proposal results ,R
in a broad range of potential traffic volumes and impacts. The range is
too broad to make the detailed traffic analysis that is typically requested
by the City meaningful . Please see the attached memo dated August 7, 1981.
More important, the level of detailed traffic analysis typically requested
by the City is not appropriate for inclusion in an environmental impact
statement. We refer you to the State Environmental Policy Act and specifi-
cally reference the following:
WAC 197-10-440 (7) (i)
WAC 197-10-440 (7) (ii)
WAC 197-10-440 (7) (a) (iv)
Such detail is appropriate as part of detailed design studies. It is not
important for the City to know detailed improvements that need to be made.
Rather, it is essential that they know where improvements are needed and
the general ability for the improvement to mitigate the impact. Because
the City must give final design approval on any plans for improvements to
the public road system, specifics regarding the design aspects of these
improvements can be determined during the preliminary design phase of the
preparation of plans, specifications and cost estimates.
The
Ms. Deborah Krouse
November 20, 1981TRANS-.'•
Page 7 sbrovp
The request to know the difference in impact between the 9,000 vpd and
34,000 vpd range of potential development options is somewhat mute since
most major arterials presently operate at or beyond capacity (please see
Police Department letter dated March 31, 1981) . We can understand that
the City would like some quantified measure of the difference in impacts
that would result from the wide range of options. We can understand that
they may believe that a detailed estimate of delay or some other measure
could be estimated. Unfortunately, the science of traffic engineering
is not as discrete as, other physical sciences like hydraulic or structural
engineering. Often, people believe that the relationship between traffic
volume and the street system is analogous to pouring water through a funnel
such that when the water is poured in faster than it goes out, the funnel
overflows the top. In the case of the street system, this analogy would
mean that delays would simply become longer and longer. . Fortunately, however,
cars are not like water molecules - cars have drivers who make decisions.
Experience shows that these drivers will withstand only so much inconven-
ience (delay) and then they seek some alternative (seek the path of least
resistance). As we have discussed above, drivers will attempt to find another
route (pour water into another funnel ) ; change the time that they travel
(wait to pour water until the funnel is partially emptied or start to pour
in water before the funnel is filled) ; or choose another mode like transit
or carpooling (convert the water to steam so it can pass with less inter-
ference) . Because of the dynamics of driver decision making, there is no
reliable way to predict (at the level of detail requested in an EIS) these
differences.
Because many of the intersections on Rainier Avenue, I-405, and Grady Way
are already at capacity, it can only be said that these capacity conditions
will continue and that the peak hour time periods will become longer. If
the City chooses to actively encourage the use of transit and high occupancy
vehicle modes as suggested in the Seattle-King County letter dated May 28, 1981,
the length of these peak periods may be shortened. Unfortunately, there is
not an exact method to assess the level of impact that is likely to occur
, if these mitigating measures are promoted.
King County Planning and Community Development (May 29, 1981)
It is intended that Monster Road be improved to a minimum two-lane roadway
with no parking. Right-of-way should be retained in areas where there are
existing or possible intersections with driveways and/or streets to permit
the addition of auxiliary turning lanes where traffic volumes warrant.
The funding for any of the improvements outlined is intended to be based
on a proportional use formula. In other words, the costs for improvements
to any connection with Monster Road and/or extension of the roadway along
the west side of Earlington Park should be allocated in proportion to the
The
Ms. Deborah Krouse
TRANSPO
November 20, 1981
Page 8 grow
traffic volumes generated by this proposal compared with the total traffic
volume using the section of road that is improved. Thus, costs would be
allocated in proportion to the benefit received. Because of the wide range
of potential volumes that could use this road (because of the wide range
of development potentials for this and other parcels in the area) , it is
impractical to specify a specific proportion at this point. It is suggested,
therefore, that at the time a more refined development is planned for this
site, the detailed traffic analysis and traffic assignment be used as a
basis for determining the appropriate proportion of costs. Final determina-
'tion of funding should be negotiated with the City using the proportional
use formula as a basis.
The westerly connection could divert up to 25 percent of the traffic generated
by the Black River Office Park and a like percentpge of the traffic generated
by Earlington Park. This mitigating measure is recommended since diversion
of travel to the west would tend to slow down traffic growth on Rainier Avenue,
I-405, and Grady Way. Such an improvement would simply decrease the length 1
of the peak period in the vicinity of the project. This improvement would
not eliminate nor result in an improved level of service on these routes
since conditions already operate at LOS E (capacity) .
Seattle King County Commuter Pool (May 28, 1981)
The suggestions offered by the Seattle King County Commuter Pool are acknowl-
edged. The success of the recommended measures may depend largely on the
mix of tenants. In the event the office space is occupied by one or several
large tenants, the possibility for these programs to be effective is enhanced.
If, on the other hand, the office is oriented towards smaller tenants, the
ability to coordinate these programs may be somewhat diminished. As a supple-
ment to the mitigating measures proposed, it is recommended that these pro-
grams be monitored such that they can be adjusted to respond to changes in
the tenant mix and respond to the success and/or failure of any of the measures.
If the demand for carpool and vanpool parking spaces increases, the propor-
tion as recommended above should be increased. On the other hand, if certain
programs prove to be unsuccessful , it is not prudent that they be continued
at the recommended levels.
li
City of Renton Police Department (March 31, 1981)
It is acknowledged that much of the road system currently operates at capacity.
We do not, however, agree that every intersection or every road section oper-
ates at this level . We also generally concur that there is likely to be
increase in the number of accidents resulting from the increased traffic vol-
ume that would be generated by this and other ap.d—ottrerrprojects in the area.
While it is a general rule that the traffic accident rate increases once a
roadway operates at or beyond capacity, the traffic accident history in the
The
Ms. Deborah Krouse
November 20, 1981 IMANSPO
Page 9 @MI/
vicinity of the project does not support this generalization. Based on
several years of traffic accident history, the traffic accident rate has
been equal to or less than the rate of increase in traffic volume. The
creation of the road system west of the site is not expected to measurably
reduce the number of accidents that would occur as a result of this project;
rather, it.will simply shift the location where those accidents might occur.
Citizen Letter (May 27, 1981)
It is acknowledged that the mitigating measure to build a roadway connection
to Monster Road would have some impact on the preservation vegatation of the
western half of the site since either a direct connection to Monster Road
or the extension of the roadway along the west side of Earlington Park would
need to cross cerLtain drainage areas and would temporarily disrupt the flow
of water and vegptation in this area.
Green River Study Group (May 26, 1981)
The comments offered by the Green River Study Group are discussed in this
letter and mitigating measures are outlined. A discussion of funding for
these improvements is also discussed above in the response to comments to
the King County Department of Planning and Community Development.
Department of Transportation (May 18, 1981)
The comments offered by the Washington State Department of Transportation
are acknowledged. The formula for funding any improvements outlined in the
mitigating measures section of this letter have been discussed above in the
response to the King County Department of Planning and Community Development.
I trust this letter responds to the questions you and City staff have regarding
traffic impacts generated by this project. If you have any questions, I
encourage you to call me.
Sincerely,
The TRANSPO Group, Inc.
David D. Markley
Principal
DDM/jk
Attachments
p I 1
LEGEND* 1360-5100 N/A ,
250-800 N/A
1984
PROJECT W/ THE
GENERATED PROJECT
XXX AAA DAILY N
YYY 888 PM PEAK o
cA a
? I4
CI AZ' 2860-6600
e w 250-800 400-950
'� ;��` PRO
gni
4.o .c .
..
450-1700 1450-270D •
�� 60-200 160-300 �a •1
A �,��s %0 \ t% •
0
Os liC •
1810-6800 13.490-18.400 :
250-800 2500-3050
1
%
?!,1 41ke lIl 1. 1
y 10.
‘INI\ 6
_ Powell Ave SW e
■• 1880-6800 11,880-16,800 Qa -
1585-2000
1 y t
N 1.1
U Z 1.
ft ® 900-3400 30,850-33,350
Lind Ave SW ' ., 125-400 2375-2650
12270-8500 113,950-20,18011 Q .
310-1000 1640-2330 Z
0
450-1700 10,200-11.450 0 �o 1149
60-200 1210-1350 ,p _ 0
0.. o o
n n
N N o 'w
. wnr Y'
y .ti
G N
II
`j6 1 50D-,2.150
E Valley Hwy
1111
Vail®y
Hwy47- Rainier A� 55D
3630-I3,600 66,780-76.750 45�360o0-,�TSO
900-3400I 60,900-63,400 _ 560-1800 6160-7400 north
I I85-600 I N/A 1 `
0 4444. ,. .
I
`1
1984 DAILY AND PM PEAK HOUR The
BLACK RIVER PROJECT GENERATED TRAFFIC AND MIANSPO
OFFICE PARK TOTAL TRAFFIC WITH PROJECT rO��
V
•
OF R APPENDIX C
A.
© z PUBLIC WORKS DEPARTMENT
TRAFFIC ENGINEERING DIVISION • 235-2620
nD MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON.WASH.98055
9$ Pam.
94TE0 SEPIt-
BARBARA Y. SHINPOCH
MAYOR August 7, 1981
TO : David Clemens, Acting Planning Director
FROM: Richard C. Houghton, Acting Public Works Director
SUBJECT: Black River Office Park
Please be advised that David Markley of The Transpo Group, Bob Thorpe of R. W.
Thorpe & Associates, Gary Norris -and myself met to discuss the EIS for the
subject proposal .
From that meeting, we determined that the best approach would be a document
which addressed the overall traffic impacts of the range of possible developments
on that parcel of land. From such an analysis, we believe that we can develop
a "feel" for the appropriate scale for the proposed development.
When a definite proposal is secured for that parcel of land, the developer will
be required to do an in-depth traffic operational study to define problem areas
and offer measures of mitigation. This analysis will involve all critical
intersections within an area defined by FAI 405 on the south, Sunset Highway
on the north, Rainier Ave. on the east and West Valley Highway on the west.
The above should be placed as a condition for all permit processes regarding this
parcel of property.
If you have any questions, please contact Gary Norris. Thank you.
c.)10,4%57
GAN:ad
cc: David Markley - ( r�,�', n �4 ^r-; -
I 7
Bob Thorpe I- -= � 1r�; .
Clint Morgan
1 0 � '
• •:.. ........s ........c:�.r..._..,. ".'i
�.•.L
. "C
•
APPENDIX D
DRAINAGE ANALYSIS SUPPLEMENT
TO BLACK RIVER OFFICE PARK EIS
March 26, 1982
•
_
DRAINAGE ANALYSIS SUPPLEMENT
TO BLACK RIVER OFFICE PARK EIS
Hydrologic/Hydraulic Modeling •
There have been at least two comprehensive hydrologic and hydraulic studies
of flooding in the Eastside-Green River (e.g. , Springbrook Creek) drainage
basin. The first study of note was a Watershed Work Plan developed by the
Soil Conservation Service (SCS) between 1965 and 1976, to assess the impact
of a proposed flood control drainage project (namely, the P-1 Channel pro-
ject) upon flooding in the Eastside-Green River area. The second comprehen-
sive study of note was a Flood Insurance Study prepared under the sponsorship
of the Federal Emergency Management Agency (FEMA). Both studies modeled the
Eastside-Green River drainage basin using the SCS-curve number method and the
SCS TR-20 hydrologic computer program. The studies also used the same design
. storm criteria. Although the same methodology was used by both studies, the
results of the analysis are quite dissimilar. The reason for the difference
can be attributed largely to the judgments made in estimating curve numbers,
time of concentration, and channel flow velocities and in the attention given
to the effect that flow retention-detention-control structures have in modi-
fying the hydrograph. The SCS study also used a drainage area that was
approximately 3% (0.7 sq. mi . ) larger than the drainage area used in the FEMA
study.
Both studies used similar curve numbers in describing the rainfall-runoff
relationship for the future condition in the drainage basin. Therefore, the
total volumes of design storm runoff predicted by the two studies for the
future condition are similar. This similarity is fortunate since the volume
of runoff is singularly the most important parameter in determining the
elevation of floodwaters in the lower portion of the Eastside-Green River basin.
The time distribution of flood flow arrival at the pump station is also im-
portant to floodwater accumulation, but to a lesser extent.
The curve numbers used by the FEMA study for existing conditions are,
however, significantly lower than the SCS curve numbers; therefore the
runoff volume predicted by the FEMA study for existing conditions is
approximately 20% less than the runoff volume predicted by the SCS study.
For both present and future conditions, the estimated time of concentra-
tion and the estimated flood flow channel velocities are respectively
longer and lower for the FEMA study than the SCS study. The FEMA study also
includes consideration of a greater number of structures that act to retain
or detail storm runoff. As a consequence, the design storm runoff hydro-
graph developed by the FEMA study exhibits an attenuation of peak flows and
a much greater "spreading out" of storm runoff over time than the SCS hydro-
graph. Figure 1 illustrates the difference in the runoff hydrographs
developed by the SCS and FEMA studies. In our assessment of the two studies
we observed that the SCS study devoted much more effort to the development of
accurate curve numbers, for each subbasin than did the FEMA study. The FEMA
study, on the other hand, appeared to devote more effort to the definition '
and inclusion of channel restrictions that either detain and/or retain storm-
water runoff flows.
Stage-Storage Relationship
The Stage-Storage curves of Figure 2 indicates the volume of flood storage
that is available below a given elevation behind the Black River Pump Station.
The upper curve represents existing conditions and the lower curve represents
conditions estimated to exist following construction of the SCS P-1 Channel
project. The curves can be used to obtain an estimate of the elevation that
floodwaters will rise for any given volume of floodwater accumulation behind
the pump station.
I
1 2
The Stage-Storage curves developed for the FEMA Flood Insurance Study differs
significantly from the curves developed by the Soil Conservation Service and
the difference in the two curves resulted in flood elevation predictions that
• varied by as much as three and one-half feet for future conditions. The SCS
b cu.rve construction for existing conditions was based on 1962 aerial survey
maps with five-foot contour intervals. (1 ) The FEMA existing conditions
curve was constructed with a more recent (1975) and more precise Corps of
Engineers aerial survey map with two-foot contour intervals.
Due to the discrepancy in available data, our staff made an independent. calcu-
lation of available flood storage using the most recent, 1980 Corps of
Engineers aerial survey map with two-foot contour intervals. The results of
our calculations tended to support the stage-storage relationship developed
for the FEMA study. (2) Consequently, we are utilizing the existing con-
ditions, Stage-Storage curve developed for the FEMA study but modified to
reflect a reduction in storage volume due to recent filling for development.
The stage-storage curve for the post-project situation reflects the excavation
of a little more than 300 acre-feet of soil below the fifteen feet MSL eleva-
tion for construction of the pump station forebay pond and phase one of the P-1
channel and assumes redistribution of the spoils within the project limits. be- it
tween the elevation of fifteen feet MSL and twenty feet MSL. This assumption
accounts for the fact that the pre-project and post-project stage-storage ! ?
curves merge at the twenty-foot elevation stage. Aside from the aforementioned.
1I
.spoils disposal assumption, if fill is imported into the project area the stage-
storage curve will move to the left. Likewise, if excavation spoils are trans
ported out of the project area the curve will shift. to the right. The curve
presented in Figure 2 is valid only if the imported fill and exported excavation
spoils trade-off are equivalent for each elevation interval ' in 'the project area.
1Per the telephone conversation with Keith Busch, SCS, Spokane, WA.
2In developing our stage-storage relationship, all storage below four-foot
MSL was assumed dead storage. In addition, it was assumed that non-contiguous'
topographic depressions did not provide effective storage below the level of
the surrounding ground elevation and that no effective storage was provided by
storage volume below elevation ten feet MSL, that was not contiguous with the
SRringbrook Creek channel . It was allowed that these non-contiguous low areas i
could be subject to seasonal ponding and therefore not be available for flood
storage. •
.
3
For example, it would require approximately 150 acre-feet of fill to raise
50.5 acres of the proposed Black River Office Park above the 17.0 MSL ele-
vation. It would require approximately 50 acre-feet of fill for each foot
of fill above the 14-foot MSL elevation. If all of the fill is imported
from outside the floodplain area, the stage--storage curves of Figure 2 should
be modified by reducing' the storage capacity available at 15.0 feet MSL by
50 acre-feet and reducing the storage capacity available at 16.0 feet MSL by
100 acre-feet, and reducing the storage capacity available at 17.0 feet and
above by 150 acre-feet.
Flood Volume Accumulation
The flood water elevation in the area behind the Black River Pump Station
is a function of the volume of water that accumulates behind the pump station.
The maximum accumulation can be estimated by applying the continuity equation
(storage = inflow-outflow) to the storm runoff flows, arriving at the pump
station. Flood waters will accumulate behind the pump station whenever the
rate of stormwater inflow exceeds the rate of pump station discharge and the
accumulation will continue until the inflow rate receeds below the pump station
discharge rate.
At present, the maximum discharge of the Black River Pump Station is constrained
by the rate of flow in the Green River. The Green River channel has a design
maximum flood flow capacity of 12,000 cfs at the Auburn USGS streamflow gaging
station. Flows or discharges entering the Green River when the flow is 12,000
cfs at the Auburn gage are in excess of the river systems design limit and en-
croach upon the systems flood control safety factor. The Corps of Engineers,
who control discharges to the Green River, have agreed to allow the Black River
Pump Station to discharge up to 400 cfs when the flow of the Green River is
12,000 cfs at the Auburn gage. The agreement is purported to be a negotiated
privilege rather than a contractual right.
Assuming that the 400 cfs pumping allowance agreement is honored, the worst case
condition for flood water accumulation behind the pump. station (e.g. , maximum
flood water accumulation) is the situation where the design flood for the Eastside-
Green River drainage area (e.g. , Springbrook Creek drainage area) occurs during
4
1'
fl
a period when the Green River is at maximum design flood stage. Under this
set of conditions the discharge of the Black River Pump Station is limited
to 400 cfs. The best case situation (e.g. , no flood water accumulation) is
where the design flood occurs when the Green River is at a level that will
allow the pump station to discharge at a rate equal to the rate of inflow to .
1
the pump station forebay.
, I
An intermediate flood water storage design condition that has been presented
by the Soil Conservation Service is the situation where the pump station can
discharge at an unlimited pumping rate for a period of twenty-two hours, at
which time it must curtail pumping to the 400 cfs level . The twenty-two hour
unlimited pumping period is based on the estimated time of travel for flood
waters released from Howard A. Hansen Dam to reach the point of discharge from
the Black River Pump Station. The rationale is based upon the scenario where 1
-
the design storm hits the entire Green River drainage basin simultaneously,
and in response to the storm the release from Howard A. Hansen Dam is imme-
diately increased from some nominal level to the maximum design release rate.
Still another condition evaluated is the situation where the pump station can
discharge at an unlimited rate for a period of twenty-two hours at which time
it must curtail pumping to a 300 cfs level . This particular situation is in-
cluded only as it represents the scenario used for the FEMA Flood Insurance
Study. .
Table 1 gives a summary of the estimated volume of runoff accumulation and
corresponding flood stage elevation for each of the aforementioned situations,
with and without the P-1 Channel project and for both present and projected
future levels of development. The results on Table 1 indicate that the design j
storm estimated flood stage elevation behind the Black River Pump Station for
present-day conditions is, most probably, in the range of 13.1 feet MSL to
14.7 feet MSL, dependent upon the particular pump station operating scenario
adopted, and that these flood stage elevations will increase to the range of
15.0 feet MSL to 17.0 feet MSL without the P-1 project when the drainage basin
has attained full development in accordance with existing land use plans.
5
TABLE 1
FLOOD STORAGE REQUIREMENTS AND FLOOD STAGE
ELEVATIONS BEHIND BLACK RIVER PUMP STATION
Required Storage Estimated Flood
Conditions Volume (AcFt) Stage Elevation (Ft)(1 )
1 . Existing Conditions - Without P-1 Chauel
a. No outlet - total storage 2900 19.2 (19.5)
b. 300 cfs max. discharge 1100 15.2 (15.4)
c. 400 cfs max. discharge 970 14.7 (14.9)
d. 22 hrs. unlimited pumping 640 13.2 (13.2)
2. Existing Conditions, - With P-1 Channel
a. No outlet - total storage 3000 19.4 (19.7)
b. 300 cfs max. discharge 1230 14.6 (14.8)
c. 400 cfs max. discharge 1000 13.6 (13.6)
d. 22 hrs. unlimited pumping 650 11 .7 (11 .7)
3. Future Conditions - Without P-1 Channel (2)
a. No outlet - total storage 3500 20.1 (20.5)
b. 400 cfs max. discharge 1800 17.1 (17.4)
c. 22 hrs. unlimited pumping 1070 15.0 (15.3)
4. Future Conditions - With P-1 Channel (2)
a. No outlet - total storage 3600 20.2 (20.6)
b. 400 cfs max. discharge 1910 17.2 (17.4)
c. 22 hrs. unlimited pumping 1090 14.0 (14.0)
(1 ) Figures in parenthesis indicate flood elevation with Black River Office Park
site filled to 18 feet MSL elevation with imported fill .
(2) Future condition assumes compensating storage for fill such that the storage
at each elevation remains unchanged from the present conditions.
With the P-1 project complete the range of estimated future flood stage
elevations will be diminished to a range between 13.9 feet MSL and 16.7 j'
feet MSL.
The flood volume accumulation and the flood stage elevation are based on
the flood hydrographs developed using the SCS TR-20 computer model as modi-
fied for use on small computers by Tudor Engineering and the data base
developed for the 1980 FEMA flood study, but updated to reflect present (1982)
and future (ultimate development in accordance with adopted Land Use Plans for
the drainage area) conditions.
j ~i
! -
Local Storm Drainage
The 71-acre site of the proposed Black River Office Park is, for the most
part, a fairly level , heavily wooded site of poor, ill-defined drainage, with
numerous areas of large, shallow topographic depressions that trap local
i
drainage and experience ponding following periods of heavy or prolonged pre-
cipitation. As a result, the natural retention and detention storage of the
existing site is relatively large. Most of the site is at an elevation be-
low fourteen feet MSL and the groundwater table at the site is high much of
the year.. In fact, several of the site depressions have standing water
throughout all but the driest seasons.
The site is bordered to the north by a set of Burlington Northern Railroad
tracks on a raised grade. Just beyond the tracks is a steep, heavily wooded
slope (e.g. , greater than 20% slope) that rises to and beyond the Empire Way
Highway. (See enclosed map. ) This slope, due to its steepness, is likely to
remain relatively undeveloped in the future.
A field inspection of the site located three drainage culverts that pene-
trated the BNRR track embankment. Of these three culverts only the most west-
erly culvert appeared to discharge to a defined drainage channel , that
7
eventually discharges to the Black River channel just upstream from the
existing Pump Station forebay. Discharge from the remaining two culverts
appeared to apread overland across the site in an ill-defined pattern, and
a large portion of this runoff, particularly from the center culvert, is
likely intercepted and detained in topographic depressions and only reaches .
the Black River channel via the groundwater or after depression storage has
been satisfied.
The most easterly culvert penetrating the railroad embankment is a 24-inch
diameter culvert that discharges storm drainage from the Earlington Woods •
Planned Unit Development located east of the subject site. Runoff from this
culvert is ultimately to the old Black River channel .
The largest portion of on-site precipitation is subject to the same fate as
the discharge from the two most easterly culverts. It is possible, however,
for worst case conditions, that the ground could be saturated and the de-
' pression storage satisfied. Under this situation the site could contribute a
rate and volume of direct runoff to the Black River channel that far exceeds
the textbook-calculated runoff for an undeveloped forested site. It is
possible that a wet-season storm could generate runoff from the existing con-
ditions that would be in the same ballpark as runoff from post-development
conditions.
After development, stormwater runoff, either generated from or transported
across Black River Office Park site, will be collected in an underground storm
drainage system and discharged to the old Black River channel . Underground
detention storage will be provided if required; however, it is proposed that
the stormwater be discharged directly to the old channel to take advantage of
any period of unrestricted pumping that may be available at the Black River
Pump Station during periods of intense storms. (See discussion of Flood Volume
Accumulation.) The Black River Office Park site is in such close proximity to
the Pump Station that stormwater detention appears to serve no beneficial pur-
pose and most likely would increase maximum floodwater accumulation and, as a
result, maximum flood stage elevation.
8
• it
II
Table' , below, provides a summation of the estimated 25-year stormwater • ':
runoff that discharges to the Black River channel from the proposed develop-
ment site. The Rational Method of Runoff estimation was used to construct
Tablet .
1 �
TABLE 2
ESTIMATION OF STORMWATER RUNOFF
FROM BLACK RIVER OFFICE PARK SITE
•
25-Year.Storm Runoff
Drainage PREDEVELOPMENT POSTDEVELOPMENT(1 )
Description Area Max.Rate(2) Volume Max.Rate(2) Volume ;'
(Acres) (CFS) (AC-FT) (CFS) (AC-FT) ! '
1 . Black River Office Park 71 .1 28.4(3) 13.7(3) 55.0 20.5
2. West Culvert 31 .5 7 1 .3 7 2.0
3. Center Culvert 15 • 4 0.8 4 1 .2
4. East Culvert (4) 51 .0 18.2 11 .0 44.2 13.2 {,' __I
(1 ) Post development assumes 80% of site will be filled and improved with t,
buildings, roads, or parking areas and the remaining 20% will be left natural -
or developed for flood storage. -
(2) Maximum runoff rates are not additive due to differences in time of concentra •
-
ti.on. Runoff volumes are additive.
(3) Assumes an Rational Method Runoff coefficient of 0.4 for runoff, rate and an •
SCS curve number of 83 for runoff volume estimate; however•, runoff. rate and
volume values could be higher as discussed in text.
• (4) Consists of West Hills drainage area north of Empire Way (32 Ac. ) and
Earlington Woods P.U.D. (19 Ac. ).
9
SCS
2500- . Future Conditions
1
2000/
4* -FEMA
Future Conditions
uu.. 1500- s• fiiu # 4®
v
®®
100a 4.4# �O®
0
• �•®
® 4%
. J
0 *®
50 ® ®®
400 cis ®A
,# N 4®
e lb 15 • 20 25 3'0 35 4b 4!5
HOURS
Figure 1
COMPARISON OF SCS AND FEMA STORM DISCHARGE HYDROGRAPHY STUDIES
25
I
20 y . Y: ..,. •
Without Project �_ •M.y
15 ,� '0♦
• •oo
s •° With Project
•
c 10
"®
m .
*' 5
cr.
•
0�
0 1000 2000 3000 4000
Storage Capacity (Acre-Feet)
Figure 2
FLOOD STAGE ELEVATION
STORAGE CAPACITY CURVE BEHIND BLACK RIVER PUMP STATION
OF RA,A
BUILDING & ZONING DEPARTMENT
RONALD G. NELSON - DIRECTOR
o .. rn
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
90 <0.
094),613
SEP�E�0
BARBARA Y. SHINPOCH
MAYOR
May 11, 1984
Burlington Northern Railroad Company
2100 First Interstate Center
Seattle, Washington 98101
Attn: Fred Brandson
Subject: Stop Work Order Posted - Vicinity Monster Road/Black River Junction
Dear Sirs:
A stop work order was posted for lack of required permits. You are in violation
of the Mining Grading Ordinance, Chapter 23, Title IV, Code of General Ordinance
of the City of Renton.
No further work can proceed until the necessary approvals and permits are issued.
Sincerely,
eaa •
- onald G. Nelson
Building Director
RGN:mbt
OF R4,
49
41 '_ ' ° BUILDING & ZONING DEPARTMENT
RONALD G. NELSON - DIRECTOR
0 � MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
Qs
0gr6.D SEP1°4�
BARBARA Y. SHINPOCH
MAYOR
December 5. 1983
Mr. Joel Haggard
Attorney at Law
720 Olive Way, Suite 1700
Seattle, WA 98101
RE: Black River Office Park
LLA-013-83; R-129-80
Dear Mr. Haggard:
The approval and recording of the lot line adjustment for the Black River Office Park
(LLA-013-83) complies with the intent of Section 4 of the "Agreement" (dated December
29, 1982). That section required that the property owners "make application to the City,
within one year after the final adoption by the City Council of an ordinance changing the
zoning classification" ... "to have the Greenbelt property in the Flood Control Property
segregated into separate legal lots." The ordinance was adopted on December 27, 1982.
The formal documentation of the transfers of title and easements should now be
forthcoming from your clients.
Sincerely,
—33 \A}c%...
Roger J. Blaylock
Zoning Administrator
RJB:se
340B
cc: Dick Houghton
Dave Clemens
Ron Nelson
Bob Bergstrom
Larry Warren
OF 1
0
4' © z THE CITY OF RENTON
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055
o BARBARA Y. SHINPOCH, MAYOR • MAXINE E.MOTOR.
• 9'OO Q,� CITY CLERK • (206) 235-2500
9-ED SEP"0-'16�
January 13, 1983
Mr. Joel Haggard
1700 Daon Building
720 Olive Way
Seattle, WA 98101
Subject: City of Renton - Ordinance No. 3694
Alterra Corporation Rezone 129-80
Dear Mr. Haggard:
The Renton City Council, at its regular meeting of December 27, 1982
has adopted Ordinance No. 3694 rezoning your property from General
Classification District (G) to Manufacturing Park (MP).
As a condition of the rezone an agreement was recorded with King Co.
Records and Elections receiving Recording No. 8301050539.
A copy of the above-referenced Ordinance is enclosed.
Very truly yours;
CITY OF RENTON
Maxine E. Motor
City Clerk
MEM:db
Enclosure: 1
cc: Hearing Examiner
No
. 115651
RECEIPT FOR CERTIFIED MAIL
NO.INSURANCE COVERAGE PROVIDED—
.NOT FOR INTERNATIONAL MAIL
(See Reverse)
SEN N04
S EET AND NO.
2
/ 0 r7 �
P.O.,ZifE AND ZIP CODE
POSTAGE , $
CERTIFIED FEE 4
LaiSPECIAL DELIVERY Q
• RESTRICTED DELIVERY Q'
SHOW TO
CC ,DELIVERED WHOM AND DATE 4
la
2 iv
H SHOW TO WHOM,DATE,AND
H Q d ADDRESS OF DELIVERY
Z W,
SHOW TO WHOM AND DATE
d CC DELIVERED WITH RESTRICTED
DELIVERY
•
.f'. STICK POSTAGE STAMPS TO ARTICLE TO COVER FIR
, '' CERTIFIED MAIL FEE,AND CHARGES FOR ANY SELECTED OPTI
r
1. ; If you want this receipt postmarked, stick the gummed stub o
+side of the article,leaving the receipt attached,and present th
window or hand it to-your rural carrier. (no extra charge)
2. If you do not want this receipt postmarked stick the gummed
address side of the article, date,detach and retain the receipt,a
•- 3. If you want a return receipt, write the certified-mail number and
return receipt card,Form 3811,and attach it to the front of the ar
ends if space permits.Otherwise,afix to back of article.Endorse fro
REQUESTED adjacent to the number.
-.4. If you want delivery restricted to the addressee, or to an authori
endorse RESTRICTED DELIVERY on the front of the article.
5. Enter fees'for the services requested in the appropriate spaces on I
return receip requested,check the applicable blocks in Item 1 of
6. Save this r and present it if you make inquiry.
* GP
•c$i.• ®SEND Comp eEa items 1,2,and 3. ` ,.
o Add yotw addee s in-t e"32ETUt N TO"agac�asi
reva:rsa
ig I. The following service,is requested(check one.) '
v
❑ Show to whom and date delivered.' • *
• 0 Show to wham;date and address of deliver'...__
- ❑ RES 1 RIC TEtlDELIVERY
401, Show to whom and date delivered _ .
1 ❑ RE.STRI TEI)DELIVERY.
Show to whom,date;and address of delive y.5_ ._. `
(CONSULTPOSTMASTER FOR FEES) '
z. ARTICLE ADt3RE ED TO: t
Burlington Northern R ' l
R i
3, Attn: Fred Brandson i
m N_._• 210.0 First Interstate Ctr.
9,
om 3. AF7:C 9E—m PEsisSeFhEo No i a in1 i tISURED Cia 1.
I
Z 115651
rif
1, (c.twrsys obtain stjei it im of set:Ira*,,sr3a ar aiys,t)
rra — i
• I have received the article desc.dbed above.
viGt ATESiir a',ddr2sac0 QAatxcr=�•ad.Irrit
DATE OF t: L.tir -J 9CnS@NARK,
_MAY_16-1 y1y
5. !-I.D0ei e. :n3 ICe of a r-ei j FT requetsmi) C
— G. LitlA$t_Fi a CELA''4'H Zir CAUSE: CL ESKI 1
trl
i i 3f.
*GPO:is rt,-..1cte,5;Ri)'
•
UNITED STATES POSTA GE ,� _�;�
OFFICIAL BUSINESS. ,�� ." tom' _
PENALTY,. OR PRIVATE' - ---
SENDER INSTRUCTI 1$ USE'TO AVOIID PAYMESt,_-," - --
R., �F-POSTJAGE,4S300 _-
Print your name,address,and ZIP Code 1 gm so pa a below: ug; �
• • Complete items 1,I,and:3• ' e d,I 1 AV • — - -- '!!!
• Attach to front of article if; - erlflijk^ w �= ` —�
.otherwise affix to back o `". ,=� .---•— ' '�'
• Endorse article"Return Receipt
Requested"
adjacent to number.
RETURN .• : RENTON BUILDING DEPARTMM
O MUNICIPAL BUILDING
200 MILL AVENUE SOUTii
RENTON,WASH 98O0
• (Name of Sender) '.
•
(Street of P.O.Box) . - •• • '�r
. • '(City,State,and ZI le) ' ' •
I le. _ 1a9- at)
/4
IP IP
• Affidavit of Publication
STATE OF WASHINGTON (
COUNTY OF KING ss.1
y ,„ CITY,TIENTON,
- • •WASHINGTON
Cindy L="';t i� ORDINANCE NO. 3694
being first duly sworn on AN ORDINANCE OF THE
• CITY OF RENTON,
S},,� C}�-ief clerk. WASHINGTON, CHANG
oath,deposes and says that is the of ING THE ZONING CLAS-
THE DAILY NEWS JOURNAL,a newspaper published six(6)times a week. ' S I FI CATIONS OF CER-
That said newspaper is a legal newspaper and it is now and has been for • ; TAIN PROPERTIES WITH-j
more than six months prior to the date of publication referred to,printed I IN THE CITY OF RENTON
and published in the English language continually as a newspaper ' t FROM GENERAL CLAS-; •.
published four(4)times a week in Kent,King County,Washington,and it is SIFICATION DISTRICT(G)!
now and during all of said time was printed in an office maintained at the TO MANUFACTURE PARK!
aforesaid place of publication of said newspaper. That the Daily News ; (MP) (R-129-80 ALTERRAf
Journal has been approved as a legal newspaper by order of the Superior " CORP)
Court of the County in which it is published,to-wit,King County, WHEREAS under Chap-!
ter 7,Title IV(Building Regu-I
Washington.That the annexed is a 01", i-,i7 i'.;^c;- .1' 55 I' lations) of Ordinance No.'
° 1628 known as "Code of
' General Ordinances of the
City of Renton", as amend-
ed, and the maps and re-1
ports adopted in conjunction t '
X as it was published in regular issues(and therewith, the property
not in supplement form of said newspaper) once each issue for a period hereinbelow described has I '
of •
1 •consecutive issues,commencing on the Public Notice- ' Public Notice i
1 I -,,-. c? heretofore been zoned as specified;subject to the find-
day of ,19 ,and ending the• i General Classification Dis- ings, conclusions and deci-
trict(G);and sion of the Hearing Examin-
WHEREAS a-proper peti- er dated July 29, 1982; the
1 tion for change of. zone Building and Zoning Director
..7.:th.day of Aii l Uary ,19.4. ..,both dates classification of said proper- is hereby authorized and
inclusive, and that such newspaper was regularly distributed to its sub- ,ty has been filed with the directed to change the maps I
scribers during all of said period. That the full amount of the fee ' Building and Zoning Depart- of the Zoning Ordinance,as
ment on or about June 2, amended, to evidence said
charged for the foregoing publication is the sum of $.!.;. ?.,.?.;lwhich 1982, which petition was rezoning, to-wit: Said pro-
f
has been paid in full at the rate of per folio of one hundred words for the ' duly inerr foro t investigation,the Hearing pert.7tbehStreet located east oNorf t e
first insertion and per folio of one hundred words for each subsequent Examiner lich S.W. se . h n the
insertion. ) study and public hearing, proposed P-1 •Channel,
and a public hearing having south of the old Chicago
, been held thereon on or Milwaukee St.Paul Railroad
c.,__'2'.'
., �,.,,,G , ;... -A-'1 about June 15,,1982, and right-of-way,and west of the
said matter having been duly extension of Thomas, Av-
considered by the Hearing enue S.W. •
. ` Examiner and said zoning SECTION II: This Ordi-
I request being in conformity nance shall be effective up-
7-th with the City's Comprehen- on its passage,approval and
Subscribed and sworn to before me this day of sive Plan,as amended,and five days after its publica-
- the City Council having duly tion.
.considered all matters relev- PASSED BY THE CITY
U ' ' u� ;19 '�3 ant thereto, and all parties COUNCIL this 27th day of
�� having_beenheard appear-r MaxineDecember,E. 1982,
ing.in support thereof or in Maxine E.Motor,City Clerk
Notary Public in a r the Sta�tte of Washington, opposition thereto, NOW APPROVED BY THE
eliding at Krei3t, King County. THEREFORE, MAYOR this 27th day of
THE CITY COUNCIL OF December, 1982.
I c_'-c ay? '1 `'7j.x - _ THE CITY OF RENTON, BarbaraY.Shinpoch,Mayor
WASHINGTON, •DO OR- Approved as to form:
ssed by the Legislature,1955,known as Senate Bill 281,effective June DAIN AS FOLLOWS: Lawrence J.Warren,
\1955. SECTION I:The following' City Attoreny
described property in the Published in the Daily Re-
7n Union Telegraph Co. rules for counting words and figures, City of Renton is hereby cord Chronicle January 7,
by the newspapers of the State. rezoned to Manufacturing 1983. R8391 .
Park (MP) as hereinbelow _. -sJ J
, — w _
,
e7 Rev.7-79
/
i.
o
CITY OF RENTON, WASHINGTON
ORDINANCE NO. 3694
AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, CHANGING
THE ZONING CLASSIFICATION OF CERTAIN PROPERTIES WITHIN THE
CITY OF RENTON FROM GENERAL CLASSIFICATION DISTRICT (G) .
- TO MANUFACTURING PARK (MP) (R-129-80 ALTERRA CORP)
WHEREAS under Chapter 7 , Title IV (Building Regulations) of
Ordinance No . 1628 known as "Code of General Ordinances of the City
of Renton" , as amended, and the maps and reports adopted in
conjunction therewith, the property hereinbelow described has
heretofore been zoned as General Classification District (G) ; and
WHEREAS a proper petition for change of zone classification
of said property has been filed with the Building and Zoning Department
on or about June 2 , 1982, which petition was duly referred to the
Hearing Examiner for investigation, study and public hearing, and
a public hearing having been held thereon on or about June 15 , 1982 ,
and said matter having been duly considered by the Hearing Examiner
and said zoning request being in conformity with the City ' s
Comprehensive Plan, as amended, and the City Council having duly
considered all matters relevant thereto , and all parties having
been heard appearing in support thereof or in opposition thereto ,
NOW THEREFORE,
THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO ,
ORDAIN AS FOLLOWS :
SECTION I : The following described property in the City
of Renton is hereby rezoned to Manufacturing Park (MP) as hereinbelow: . : ;,
specified; subject to the findings , conclusions and decision of
the Hearing Examiner dated July 29, 1982 ; the Building and Zoning
Director is hereby authorized and directed to change the maps of
the Zoning Ordinance , as amended, to evidence said rezoning, to-wit :
See Exhibit "A" attached hereto and made a part hereof
as if fully set forth herein.
(Said property being located North of S .W. 7th Street
east of the proposed P-1 Channel , south of the old
Chicago Milwaukee St . Paul Railroad right-of-way, and
west of the extension of Thomas Avenue S .W. )
SECTION II : This Ordinance shall be effective upon its
passage, approval and five days after its publication .
PASSED BY THE CITY COUNCIL this27th day of December , 1982 .
e
Maxine E. Motor , City Clerk
APPROVED BY THE MAYOR this27th day of December, 1982 .
, S •
Bar ara Y. zinpocz, Mayor
Approved as to form:
Lawrence J . Warren, City Attorney
Date of Publication : January 7, 1983
•
EXHIBIT "A"
LEGAL DESCRIPTION •
. ALTERRA REZONE, File R-129-80 1 OF 2
ORDINANCE No.
PAGE. 1 of 7
PARCEL A:
THAT PORTION OF THE SOUTHWEST QUARTER OF .SECTION_13,. TOWNSHIP 23 •
. NORTH, RANGE 4 EAST, N.H.• IN KING COUNTY, WASHINGTON; AND
THAT PORTION OF 'JUNCTION ADDITION TO CITY OF SEATTLE, ACCORDING TO THE
PLAT RECORDED IN VOLUME 12 OF PLATS, PAGE 75, IN KING COUNTY, '
WASHINGTON, TOGETHER WITH VACATED STREETS ADJOINING WHICH WOULD ATTACH
TO SAID PREMISES BY OPERATION OF LAW, AND OF C. E. BROWNELL'S DONATION
CLAIN NO. 41. AND OF THAT PORTION OF TRACT • RENTON SHORE LANDS 2ND
SUPPLEMENTAL, DESCRIBED AS FOLLOWS: •
BEGINNING AT THE. SOUTH QUARTER CORNER OF SAID SECTION 13; THENCE NORTH
00058'28" EAST ALONG THE NORTH-SOUTH CENTERLINE OF SAID SECTION 13 A
DISTANCE OF 004.84 FEET TO THE SOUTHEAST CORNER OF TRACT 26 OF RENTON
SHORELANDS SECOND SUPPLEMENTAL MAPS, 1958; THENCE SOUTH 72°37'52" WEST
ALONG THE SOUTH BOUNDARY OF SAID TRACT 26 A DISTANCE OF 382.60 FEET;
THENCE NORTH 70°54'02" WEST ALONG SAID SOUTH . BOUNDARY OF TRACT 26 A
DISTANCE. OF• 73.50 FEET TO THE EAST LINE OF THE CHARLES BROWNELL
DONATION LAND CLAIM NO. 41 AND THE TRUE POINT OF BEGINNING; THENCE
CONTINUING NORTH 70°54'O2" WEST ALONG SAID SOUTH BOUNDARY OF TRACT 26 I
DISTANCE OF 281 .02 FEET; THENCE SOUTH 73°56'O1" WEST ALONG SAID SOUTH
BOUNDARY OF TRACT 26 A DISTANCE OF 130.08 FEET; THENCE SOUTH 41°16'07"
WEST ALONG SAID SOUTH BOUNDARY OF TRACT 26 A DISTANCE OF 316.18 FEET It
THE NORTH BOUNDARY OF A TRACT OF LAND DEEDED TO KING COUNTY AND
DESCRIBED UNDER KING COUNTY AUDITOR'S FILE NO. 6607786; THENCE
WESTERLY ALONG SAID NORTH BOUNDARY ON A CURVE TO THE LEFT, THE CENTER
OF WHICH BEARS SOUTH 39°41'39" WEST HAYING A RADIUS OF 627.46 FEET AN
• ARC DISTANCE OF 434.70 FEET THROUGH A CENTRAL ANGLE OF 39°41'39";
THENCE NORTH A DISTANCE OF 25.00 FEET ALONG SAID NORTH BOUNDARY;
THENCE WEST A DISTANCE OF 280.69 FEET ALONG SAID NORTH BOUNDARY;
THENCE SOUTH 59°53'47" WEST ALONG SAID NORTH BOUNDARY A DISTANCE OF
377.52 FEET; . THENCE SOUTH..749.13!19"__WEST . ALONG..SAID NORTH BOUNDARY A
DISTANCE OF 443.31 FEET TO THE NORTHERLY MARGIN OF THE- CHARLES MONSTER
COUNTY ROAD; THENCE NORTH 34°18'31" WEST ALONG SAID NORTHERLY MARGIN A
DISTANCE OF 43.46 FEET TO THE SOUTH LINE OF THE BURLINGTON NORTHERN
RAILROAD RIGHT-OF-WAY; THENCE ALONG A CURVE TO THE LEFT, ALONG SAID
SOUTH LINE, THE CENTER OF WHICH BEARS NORTH 06°34'41" WEST HAVING A
RADIUS OF 696.00 FEET, AN ARC DISTANCE OF 45.43 FEET THROUGH A CENTRAL
ANGLE OF 03°44'25" TO A POINT OF COMPOUND CURVE; THENCE ALONG A CURVE
TO THE LEFT, ALONG SAID SOUTH LINE, THE CENTER OF WHICH BEARS NORTH
10°19'06" WEST HAVING A RADIUS OF 19055.00 FEET, AN ARC DISTANCE OF
209.95 FEET THROUGH A CENTRAL ANGLE OF 11°24 ' 08" TO A POINT OF COMPOUND
CURVE; THENCE ALONG A CURVE 70 THE LEFT, ALONG SAID SOUTH LINE, THE
CENTER OF WHICH DEARS NORTH 21°43'14" WEST HAVING A RADIUS OF 727.00
FEET, AN ARC DISTANCE OF 214.77 FEET THROUGH. A CENTRAL ANGLE OF
16°55'35" TO A POINT OF COMPOUND CURVE; THENCE ALONG A CURVE TO THE
LEFT, ALONG SAID SOUTH LINE, THE CENTER OF WHICH BEARS NORTH 38°38'49"
•
2 OF 2
NEST HAVING A RADIUS OF ' 1,571.00 FEET. AN ARC DISTANCE OF 206.57 FEE
THROUGH A CENTRAL ANGLE OF 07°32°02" TO A POINT OF TANGENCY; THENCE
NORTH 43°49'09" EAST ALONG SAID SOUTH LINE A DISTANCE OF 97.17 FEET TO
A LINE 35 FEET SOUTHERLY OF AND PARALLEL WITH THE CENTERLINE OF THE
EXISTING MOST SOUTHERLY TRACK OF THE CHICAGO, MILWAUKEE, ST. PAUL AO '
PACIFIC RAILROAD TRACKS; THENCE ALONG SAID PARALLEL LINE ON A CURVE TO
THE RIGHT, THE CENTER OF WHICH BEARS SOUTH 42°43' 18" EAST HAVING A
RADIUS OF 696.89 FEET• AN ARC DISTANCE OF 40.09 FEET THROUGH A CENTRAL
ANGLE OF 03°17'45"; THENCE NORTH 50°34°27" EAST ALONG SAID PARALLEL
LINE A DISTANCE OF 248.50 FEET; THENCE ALONG SAID PARALLEL LINE ON a
CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH 39°25'33" EAST
HAVING A RADIUS OF 676.58 FEET, AN ARC DISTANCE OF 93.64 FEET THROUG4 A
CENTAL ANGLE OF 07°55'47" TO A POINT OF REVERSE CURVE; THENCE ALONG
SAID PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS
NORTH 31°29'46" WEST HAVING A RADIUS OF 428.64 FEET, AN ARC. DISTANCE OF
73.32 FEET THROUGH A CENTRAL ANGLE OF. 09°48 '04" TO A POINT OF REVERSE
CURVE; THENCE ALONG SAID PARALLEL LINE ON A CURVE TO THE RIGHT, THE
CENTER OF WHICH• BEARS SOUTH 41°17'50" EAST HAVING A RADIUS OF 2,580.74
FEET, AN ARC DISTANCE OF 437.40 FEET THROUGH A CENTRAL ANGLE OF
09°42'39" TO A POINT OF COMPOUND CURVE; THENCE ALONG SAID PARALLEL LINE
ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH 31°35'11"
EAST HAVING A RADIUS OF 2,790.19 FEET, AN ARC DISTANCE OF 789.44 FEET
THROUGH A CENTRAL ANGLE OF 16°12'39" TO THE EAST LINE OF THE CHARLES
BROWNELL DONATION LAND. CLAIH NO. 41 ; THENCE SOUTH 01°24'04" WEST ALC
SAID EAST LINE A DISTANCE OF 950.58 FEET TO THE TRUE POINT OF
BEGINNING. •
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
EXHIBIT "A"
LEGAL DESCRIPTION
ALTERRA REZONE, File R-129-80
ORDINANCE No.
PAGE 2 o 7
EXHI C "A"
LEGAL DESCRIPTION
ALTERRA REZONE, File R-129-80
" ORDINANCE No.
PAGE .3 o f 7' --` 1 OF 3
•
•
•
. .
PARCH Bt
• THAT PORTION OF. C. E. BROWNELL'S DONATION CLAIM NO. 41• AND OF THE
SOUTHWEST QUARTER AND THE SOUTHEAST QUARTER OF SECTION 13• TOWNSHIP 23
NORTH. RANGE 4 EAST,, W.H.• IN KING COUNTY. WASHINGTON, DESCRIBED AS
FOLLOWS:
BEGINNING AT THE SOUTH QUARTER CORNER OF SAID SECTION 13; THENCE NORTH
00°58'28" EAST. ALONG THE NORTH-SOUTH CENTERLINE OF SAID SECTION 13 A
DISTANCE OF 884.54- FEET. TO THE SOUTHEAST CORNER OF TRACT 26 OF RENTON
SHORELANDS SECOND SUPPLEMENTAL MAPS, 1958; THENCE SOUTH 72°37'5.2" WEST
ALONG THE SOUTH BOUNDARY OF SAID TRACT 26 A DISTANCE OF 382.60 FEET;THENCE NORTH .70°54'02" WEST- ALONG SAID SOUTH BOUNDARY OF TRACT 26 A
DISTANCE OF 73.50 FEET TO THE EAST LINE .OF THE CHARLES BROWNELL
DONATION LAND CLAIM ND. 41; THENCE NORTH. 01°24'04" EAST ALONG SAID
EAST LINE OF THE CHARLES BROWNELL DONATION LAND CLAIM ND. 41 A DISTANCE
OF 950.58 FEET TO A LINE 35 FEET SOUTHERLY OF AND PARALLEL WITH THE
CENTERLINE OF THE .EXISTING MOST SOUTHERLY TRACK OF THE CHICAGO•
MILWAUKEE• ST. PAUL E PACIFIC RAILROAD TRACKS AND THE TRUE POINT OF
BEGINNING; THENCE WESTERLY ALONG SAID PARALLEL LINE ON A CURVE TO THE
LEFT, THE CENTER OF WHICH BEARS SOUTH 15°22'32" EAST HAVING. A RADIUS 9F
2790.19 FEET, AN ARC DISTANCE OF 789.44 FEET THROUGH A CENTRAL ANGLE OF
16°12'39" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
.
2 OF 3
PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS SOUTH
31035'11" EAST HAVING A RADIUS OF 2580.74 FEET• AN ARC DISTANCE OF
437.40 FEET THROUGH A CENTRAL ANGLE OF 09°42' 39" TO A POINT OF REVERSE
CURVE; THENCE CONTINUING ALONG SAID PARALLEL LINE ON A CURVE TO THE
RIGHT, THE CENTER OF WHICH BEARS NORTH 41°17'50" WEST HAVING A RADIUS
OF. 428.64 FEET, AN ARC DISTANCE OF 73.32 FEET THROUGH A CENTRAL ANGLE
OF 09°48'04"•• TO A POINT OF REVERSE CURVE; THENCE CONTINUING ALONG SAID
PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS SOUTH
31°29'46" EAST HAVING A RADIUS OF 676.58 FEET, AN ARC DISTANCE OF 93.64
FEET THROUGH A CENTRAL ANGLE OF 07°55'47" TO A • POINT OF TANGENCY;
THENCE CONTINUING ALONG' SAID PARALLEL •LINE SOUTH 50°34'27" WEST A
DISTANCE OF 248.50 FEET TO A POINT OF CURVE; THENCE CONTINUING ALONG
SAID PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS .
SOUTH 39°25'33" EAST HAVING A RADIUS OF 696.89 FEET, AN ARC DISTANCE OF
40.09 FEET THROUGH A CENTRAL ANGLE OF 03°17 '45" TO THE SOUTH LINE OF
THE BURLINGTON NORTHERN RAILROAD RIGHT-OF-WAY; THENCE NORTH 43°49'09"
EAST ALONG SAID SOUTH LINE A DISTANCE OF 173.83 FEET TO A POINT OF
CURVE; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE
RIGHT, THE CENTER OF WHICH BEARS SOUTH 46°10' 51" EAST HAVING A RADIUS
OF 4030.00 FEET, AN ARC DISTANCE OF 197.57 FEET THROUGH A CENTRAL ANGLE
OF 02°48'32" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID,
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
43°22'19" EAST HAVING A RADIUS OF 1853.00 FEET, AN ARC DISTANCE OF
194.75 FEET THROUGH A CENTRAL ANGLE OF 06°01' 18" TO A POINT OF COMPOUND
CURVE; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE RIGHT,
THE CENTER OF WHICH BEARS,. SOUTH 37°21'01" EAST HAVING A RADIUS OF
10543.00 FEET• AN ARC DISTANCE OF 186.51 FEET THROUGH A CENTRAL ANGLE
OF 01°00'49" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
36°20'12" EAST HAVING A RADIUS OF 1657.00 FEET AN ARC DISTANCE OF
193.93 FEET THROUGH A CENTRAL ANGLE OF. 06°42'20" TO A POINT OF COMPOUND
CURVE; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE RIGHT,
THE CENTER OF WHICH BEARS SOUTH 29°37'52" EAST HAVING A RADIUS OF
6738.00 FEET, AN ARC DISTANCE OF 197.76 FEET THROUGH A CENTRAL ANGLE OF
O1°40'54" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
27°56'58" EAST HAVING A RADIUS OF 1768.00 FEET, AN ARC DISTANCE OF
194.45 FEET THROUGH A CENTRAL ANGLE OF 060111'06" TO A POINT OF COMPOUND
CURVE; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE RIGHT, '
THE CENTER OF WHICH BEARS SOUTH 21°38'52" EAST HAVING A RADIUS OF
8603.00 FEET, AN ARC DISTANCE OF 204.54 FEET THROUGH A CENTRAL ANGLE OF
01°21'44" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
20°17'O8" EAST HAVING A RADIUS OF 1922.10 FEET, AN. ARC DISTANCE OF
178.79 FEET THROUGH A CENTRAL ANGLE OF 05°19'46" TO A POINT OF COMPOUND
CURVE ON THE EAST LINE OF SAID CHARLES BROWNELL DONATION LAND CLAIM NO.
41; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE RIGHT,
THE CENTER OF WHICH BEARS SOUTH 14°57'22" EAST HAVING A RADIUS OF
2014.93 FEET, AN ARC DISTANCE OF 659.42 FEET THROUGH A CENTRAL ANGLE OF
13°25'19" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
EXHIBIT "A"
LEGAL DESCRIPTION
ALTERRA REZONE, File R-129-80
ORDINANCE NO.
PAGE 4 O 7
•
3 OF 3
01°32'03" EAST HAVING A RADIUS OF 1165.09 FEET, AN ARC DISTANCE OF
10'97.05 FEET THROUGH A CENTRAL ANGLE OF 53°57 .00" TO A POINT OF
TANGENCY; THENCE CONTINUING ALONG SAID SOUTH LINE SOUTH 37°35•03" EAS
A DISTANCE OF 306.70 FEET TO A POINT OF CURVE; THENCE -CONTINUING ALON
SAID SOUTH LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS
NORTH 52°24'57" EAST HAVING A RADIUS OF 1005.37 FEET, AN ARC DISTANCE
OF 45.82 FEET THROUGH A CENTRAL ANGLE OF 02°36'41" TO A LINE 35 FEET
SOUTHERLY OF AND PARALLEL WITH THE CENTERLINE OF THE EXISTING MOST
SOUTHERLY TRACK OF THE CHICAGO, MILWAUKEE, ST. PAUL C PACIFIC RAILROA1
TRACKS; THENCE WESTERLY ALONG SAID PARALLEL LINE NORTH 40°11'44" WEST
DISTANCE OF 126.24 FEET TO A POINT OF CURVE; THENCE CONTINUING ALONG
SAID PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS
SOUTH 49°43'16" WEST HAVING A RADIUS OF 1829.78 FEET, AN ARC DISTANCE
OF 309.67 FEET THROUGH A CENTRAL ANGLE OF 09°41'48"; THENCE NORTH
49°53'32" WEST ALONG SAID PARALLEL LINE A DISTANCE OF 167.07 FEET 70 J
POINT OF CURVE; THENCE CONTINUING ALONG SAID PARALLEL LINE ON A CURV;
TO THE LEFT, THE CENTER OF WHICH BEARS SOUTH 40°06'28" WEST HAVING A
RADIUS OF 1102.46 FEET, AN ARC DISTANCE OF 807.11 FELT THROUGH A
CENTRAL ANGLE OF 41°56'46" TO A POINT OF COMPOUND CURVE; THENCE
CONTINUING ALONG SAID PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER
OF WHICH BEARS SOUTH 01°50' 18" EAST HAVING A RADIUS OF 2790.19 FEET, A
ARC DISTANCE OF 659.24 FEET THROUGH A CENTRAL ANGLE OF 13°32' 14" TO
THE TRUE POINT OF BEGINNING.
•
•
EXHIBIT "A"
LEGAL DESCRIPTION
ALTERRA REZONE, File R-129-80
ORDINANCE No.
PAGE 5 of-7—
1 O1'
EXHIBIT "A"
LEGAL DESCRIPTION
ALTERRA REZONE, File R-129-80
ORDINANCE No.
PAGE 6 or-7—
PARCEL "C"
THAT PORTION OF TRACT 25, RENTON SHORELANDS SECOND
SUPPLEMENTAL: AND
THAT PORTION OF THE SOUTHEAST QUARTER OF SECTION 13, AND THE
SOUTHWEST QUARTER OF SECTION 13 IN TOWNSHIP 23 NORTH, RANGE 4 EAST
W.M., AND THE SOUTHWEST QUARTER OF SECTION 18, TOWNSHIP 23 NORTH,
RANGE 5 EAST W.M. IN KING COUNTY, WASHINGTON DESCRIBED AS FOLLOWS:
BEGINNING AT THE SOUTH QUARTER CORNER OF SAID SECTION 13; THENCE
NORTH 00°58'28" EAST ALONG THE NORTH-SOUTH CENTERLINE OF SAID SECTION
13, A DISTANCE OF 884.84 FEET TO THE SOUTHEAST CORNER OF TRACT 26 OF
RENTON SHORELANDS SECOND SUPPLEMENTAL MAPS, 1958, AND THE TRUE POINT
OF BEGINNING; THENCE SOUTH 72°37'52" WEST ALONG THE SOUTH BOUNDARY OF
SAID TRACT 26, A DISTANCE OF 382.60 FEET; THENCE NORTH 70°54'02" WEST
ALONG THE SOUTH BOUNDARY OF SAID TRACT 26, A DISTANCE OF 73.51 FEET TO
THE EAST LINE OF THE CHARLES BROW NELL DONATION LAND CLAIM NO. 41;
THENCE NORTH 01°24'04" EAST ALONG SAID EAST LINE, A DISTANCE OF 950.58
FEET TO A LINE 35 FEET SOUTHERLY OF AND PARALLEL WITH THE CENTERLINE
OF THE EXISTING MOST SOUTHERLY TRACK OF THE CHICAGO, MILWAUKEE, ST.
PAUL AND PACIFIC RAILROAD TRACTS; THENCE ALONG SAID LINE 35 FEET
SOUTHERLY OF AND PARALLEL WITH THE CENTERLINE OF THE MOST SOUTHERLY
TRACK, ALONG A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
15°22'32" EAST, HAVING A RADIUS OF 2,790.19 FEET, AN ARC
2 OF 2
' •
•�
DISTANCE OF 659.24 FEET THROUGH A CENTRAL ANGLE OF 13°32' 14"
TO A POINT OF COMPOUND CURVE;
THENCE ALONG A CURVE TO THE RIGHT, ALONG SAID PARALLEL LINE,
THE CENTER OF WHICH BEARS SOUTH O1°50' 18" EAST HAVING A
RADIUS OF 1,102.46 FEET, AN ARC DISTANCE OF 807.11 FEET
THROUGH A CENTRAL ANGLE OF 41°56'46"; THENCE SOUTH 49°53'32"
EAST, ALONG SAID PARALLEL LINE, A DISTANCE OF 167.07 FEET;
• THENCE ALONG A CURVE TO THE RIGHT, ALONG SAID PARALLEL LINE, .
HAVING A RADIUS OF 1,829.78 FEET, AN ARC DISTANCE OF 309.67
FEET THROUGH A CENTRAL ANGLE OF 09°41.48"; THENCE
LEAVING SAID PARALLEL LINE, SOUTH 40°11 '44" EAST, A '
DISTANCE OF .126.24 FEET TO A POINT ON THE SOUTH LINE OF THE
BURLINGTON NORTHERN RAILROAD RIGHT-OF-WAY;
THENCE ALONG A CURVE TO THE LEFT, ALONG SAID SOUTH LINE♦ THE
CENTER OF WHICH BEARS NORTH 49°48'16" EAST HAVING A RADIUS
OF 1,005.37 FEET, AN ARC DISTANCE OF 549.02 FEET THROUGH A
CENTRAL ANGLE OF 31°17'19" TO A POINT OF TANGENT ON SAID
SOUTH LINE OF THE BURLINGTON NORTHERN RAILROAD RIGHT-OF-WAY;
THENCE CONTINUING ALONG SAID SOUTH LINE, SOUTH 71°29'03". -
EAST ALONG A LINE 50 FEET SOUTH OF AND PARALLEL WITH THE
EXISTING SOUTHBOUND TRACK,-A DISTANCE OF 826.56 FEET- TO THE -
WEST LINE OF SAID SECTION 18; THENCE CONTINUING ALONG' SAID
SOUTH LINE SOUTH 71°29'03" EAST, A DISTANCE 'OF85.52 FEET TO THE
NORTH LINE OF THE SOUTH 650 FEET OF THE SOUTHWEST QUARTER OF
THE SOUTHWEST QUARTER OF SAID SECTION 18; THENCE NORTH
89°10'25" WEST ALONG THE NORTH LINE OF SAID SOUTHWEST QUARTER
OF THE SOUTHWEST QUARTER OF SECTION 18, A DISTANCE OF 81.57
FEET TO THE EAST LINE OF .THE SOUTHEAST QUARTER OF SAID SECTION
13; THENCE NORTH 88°15 '00" WEST ALONG THE NORTH LINE OF THE
NORTH 650 FEET OF THE SOUTHEAST QUARTER OF SAID SECTION 13, •
A DISTANCE OF 2,261.41 FEET TO AN ANGLE POINT ON THE SOUTH
BOUNDARY OF TRACT 25 .OF RENTON SHORE LANDS, 1958; THENCE
NORTH 33°07 '25" WEST ALONG SAID SOUTH BOUNDARY, A DISTANCE
OF 154.51 FEET TO AN ANGLE POINT; THENCE NORTH 27°21'32"
EAST ALONG SAID SOUTH BOUNDARY, A DISTANCE OF 387.32 FEET
TO AN ANGLE POINT; THENCE NORTH 83°17'25" WEST ALONG SAID SOUTH
BOUNDARY, A DISTANCE OF-- 171.17 FEET;-THENCE -SOUTH•-46°22122" -- - .
WEST ALONG SAID SOUTH BOUNDARY, A DISTANCE OF 324.66 FEET; -
THENCE SOUTH 72°37'52" WEST ALONG SAID SOUTH BOUNDARY, A
DISTANCE OF 76.33 FEET TO THE TRUE POINT OF BEGINNING.
EXHIBIT "A"
LEGAL DESCRIPTION
ALTERRA REZONE, File R-129-80
ORDINANCE No.
PAGE 7 p 7
l ''''R
, , , Ar--- _. / a q- go
. 1
c,
, •
H ,
3:'01::05 #FI I57,9 B
• REO D F 29.50
i=HSH L :4:**29. 50
AGREEMENT 22
This AGREEMENT (this "Agreement" ) is made
this 29th day of December , 1982, by and between
Renton Property Associates, a Washington general
partnership ( "RPA" ) , JAG-Renton Associates, a Washington
general partnership ( "JAG" ) , and the City of Renton, a
Washington municipal corporation (the "City" ) .
o RPA is the fee owner of that certain real
property legally described on Exhibit 1 hereto ( "Parcel
0 A" ) and that certain real property legally described on
p Exhibit 2 hereto ( "Parcel B" ) .
e-i
o JAG is the owner of a contract vendee 's interest
JD in that certain real property legally described on Exhibit
3 hereto ( "Parcel C" ) pursuant to that certain Real Estate
Contract recorded as Instrument No. 8004240435 in the
Records of King County, Washington, by and between JAG and
John B. Hansen, Inc . , a Washington corporation
( "Hansen" ) .
Alterra Corporation, a Washington corporation
( "Alterra" ) , as agent for RPA and JAG, has requested the
City to rezone Parcel A, Parcel B, and Parcel C
(collectively the "Rezone Property" ) from their present
classification of G-1 to the new classification of M-P
under the City Municipal Code . A general diagram of the
Rezone Property is attached as Exhibit 4 hereto. The
City's Office of the Land Use Hearing Examiner has
recommended changing the zoning classification of the
Rezone Property to the M-P classification upon certain
terms and conditions as set forth in that certain Report
and Recommendation to the Renton City Council (the
"Report" ) dated July 29, 1982, issued under File No.
R-129-80 . RECORDED 1 HIS
Now, therefore, the parties hereto do hereby JAN 5 2 0811
agree as follows:
BY T HC Ciiv' duj
• Section 1 . Condition. Pursuant to the Report, REcOWA, 11E0',
RPA and JAG are required to take certain actions before KIN(J :OLJNTY
the City ordinance on the rezone requested by Alterra is
heard and decided . The terms and conditions of this
Agreement shall be without prejudice to the City Council' s
deliberations on said ordinance, but this Agreement and
each and every provision herein are conditioned upon the
City's changing the zoning classification of the Rezone
Property to M-P subject only to the terms and conditions
set forth in the Report . If the City fails to change the
zoning classification of the Rezone Property to M-P, this
Agreement shall be null and void and none of the parties
hereto shall have any rights hereunder .
Section 2 . Easement Grant . The provisions of
this Section 2 are conditioned upon the City's compliance
with each and every term of this Agreement .
2 . 1 RPA hereby conveys and quit claims to
the City an easement for greenbelt and open-space purposes
in those portions of that certain real property legally
described on Exhibits 5 , 6 and 7 hereto (the 'Greenbelt
Ilik
12/17/82
7792E 1
. ✓ _ - .
Property" ) located within Parcel A and Parcel B and an
easement for greenbelt, open-space, wildlife habitat and
flood control purposes in that portion of that certain
real property described on Exhibit 8 hereto (the "Flood
Control Property" ) located within Parcel A. Prior to the
conveyance anticipated by Section 4 hereof, neither RPA
nor the City shall be entitled to locate any structures
upon the Greenbelt Property. RPA and the City shall each
be entitled to excavate the Flood Control Property for
flood control purposes and locate structures serving flood
control purposes, and no others, upon the Flood Control
Property.
0 • 2 .2 JAG hereby conveys and quit claims to
c1 the City an easement for greenbelt and open-space purposes
';) in those portions, of the Greenbelt Property located within
O Parcel C and an easement for greenbelt, open-space,
O wildlife habitat and flood control purposes in that
portion of the Flood Control Property located within
CD Parcel C. Prior to the conveyance anticipated by Section
GO 4 hereof, neither JAG nor the City shall be entitled to
locate any structures upon the Greenbelt Property. JAG
and the City shall each be entitled to excavate the Flood
Control Property for flood control purposes and locate
structures serving flood control purposes, and no others,
upon the Flood Control Property.
2 .3' JAG and RPA hereby convey and quit
claim to the City an access easement over and across the
Rezone Property for purposes of excavating and
constructing flood control structures upon the Flood
Control Property; provided, that ( i) the City shall only
use such portions of the Rezone Property that are not
within the Greenbelt Property and or the Flood Control
Property (the "Retained Property" ) for such access
purposes as may be reasonably designated for such use by
RPA and or JAG, (ii) the City shall make reasonable
efforts to restore and repair any damage caused by its use
of the Retained Property, and (iii) the City shall execute
and acknowledge any and all instruments reasonably
requested by RPA and or JAG for the purpose of confirming
the exact location or locations of the easement granted
the City by this Section 2.3 .
2 .4 JAG and RPA each hereby reserve the
right to locate utility lines, including, without
limitation, lines for water, sewer, gas, electric and
telephone service, over and across the Greenbelt Property
and or the Flood Control Property and the right to enter
upon said properties for the purpose of installing,
maintaining and relocating such lines, provided that ( i)
JAG and or RPA shall make reasonable efforts to restore
such properties to their original condition after the
installation of any such utility lines and (ii) such
utility lines shall not be located in a manner that will
unreasonably interfere with either any then existing •
utility lines of the City or any utility lines which the
City then has specific and definite plans to install in
specific locations.
Section 3. Limitation. The easement rights
granted the City herein -are granted on a quit claim basis
only and are subject to all rights, covenants,
reservations, and restrictions applicable to the Greenbelt
12/17/82
7792E 2
I 1�l ;
J
Property and the Flood Control Property as of the date
hereof, including, without limitation, those matters
described in Exhibit 9 hereto.
Section 4 . Fee Title . Provided that the City is
not in breach of any of the terms and conditions hereof,
at such time or times as the Greenbelt Property and or the
Flood Control Property have been segregated into separate
legal lots, RPA and or JAG, as appropriate, shall quit
claim the fee title to the Greenbelt property and the
Flood Control Property to the City; provided that any such
conveyances shall ( i) be subject to all matters described
in Section 3 and 'Exhibit 9 hereof, (ii) restrict the City
from using the subject property except as set forth in
c'l Section 2 hereof, and (iii) reserve the rights set forth
to in Section 2 .3 hereof, and provided further that any
Q conveyance of all, or part of the Flood Control Property
c3 shall reserve a flood control easement in the Flood
ri Control Property for the grantor, which easement shall
c0 include the right to excavate, locate structures upon and
up maintain the subject property for flood control purposes .
RPA and JAG shall also (i) make application to the City,
within one year after the final adoption by the City
Council of an ordinance changing the zoning classification
of the Retained Property to M-P subject only to the terms
and conditions set forth in the Report, to have the
Greenbelt property in the Flood Control Property
segregated into separate legal lots.
Section 5. Development Credit . Notwithstanding
either the easements granted the City under Section 2
hereof or a conveyance to the City pursuant to Section 4
hereof, for purposes of all land use and or building
applications of any kind related to the Retained Property,
the City and each of its individual departments, offices,
agencies, officers, agents and employees shall (i) treat
the Retained Property as if it included the area of the
Greenbelt Property and the Flood Control Property within
its boundaries and (ii) credit the Retained Property with
the flood storage capacity of the Flood Control Property,
which credit shall include any increase in flood storage
capacity beyond that existing on the date hereof . In
addition, no buildings or other structures or improvements
located upon either the Greenbelt Property or the Flood
Control Property shall in any way reduce the number of
gross square feet which may be constructed upon the
Retained Property ,or increase any flood storage capacity
or storm water retention requirements for the Retained
Property. For example, without limitation, RPA and or JAG
shall receive credit for the development acreage
equivalencies of the Greenbelt Property and the Flood
Control Property and the flood storage capacity of the
Flood Control Property when developing the Retained
Property. Notwithstanding anything contained herein to
the contrary, the City shall not be obligated to allow the
construction of more than. 995,781 .5 gross square feet upon
the Retained Property.
Section 6 . Joinder . Hansen joins in this
Agreement for the purpose of subjecting its interest in
the Greenbelt Property and the Flood Control Property to
the terms and conditions contained herein. Furthermore,
as long Hansen retains an interest in the Greenbelt
Property and or the Flood Control Property, it agrees to
12/17/82 '
7792B 3
JAG:
JAG-RENTON ASSOCIATES ,
a Washingto general partrj ship
By
• Ronald G. Neu er
General Partne
B(yr-h
dir \
a7 Delton J. Bonds
General Partner
4
O
In
BY ,
V1 enneth L. Thompso0
• General Partner
By
Me ton Cohen
General Partner
HANSEN:
JOHN 0, HANSEN, INC.
a Washington corporation
By
STATE OF WASHINGTON )
ss.
COUNTY OF KING )
On this day personally appeared before me Barbara
Y. Shinpoch and Maxine E. Motor
to me known to be
the Mayor and City Clerk
respectively, of the City of Renton, the municipal
corporation that executed the within and foregoing
instrument, and acknowledged the said instrument to be the
free and voluntary act and deed of said corporation for
the uses and purposes therein mentioned, and on oath
• stated that he was authorized to execute said instrument,
and that the seal affixed is the corporate seal of said
corporation.
Given under my hand and official seal .this 29th
day of December , 1982.
\\k);‘)0c->
Notary Public i13 ac <.foz�.th'e.
State of Washirigres i•n'g
• at �eh1ot� : . i�� •
0r
12/17/82 t: '•
7792B 5 j,, ;r� ;roJ,,•r'.�Y.
•
STATE OF WASHINGTON )
ss.
COUNTY OF KING )
On this day personally appeared before me Ronald
G. Neubauer, to me known to be a General Partner, of
RENTON PROPERTY• ASSOCIATES, the partnership that executed
the within and foregoing instrument, and acknowledged the
said instrument to be the free and voluntary act and deed
of said corporation for the uses and purposes therein
mentioned, and on oath stated that he was authorized to
execute said instrument .
Given under my hand and official seal this tI \,
0 day of D , 1982.
kk3c:a ... .....
Cs
ri
a Public in and for the
M to Washi gton,
GO at
STATE OF WASHINGTON )
ss. .
COUNTY OF KING )
On this day personally appeared before me Delton
J. Bonds, to me known to be a General Partner, of RENTON
PROPERTY ASSOCIATES, the partnership that executed the
within and foregoing instrument, and acknowledged the said •
instrument to be the free and voluntary act and deed of
said corporation for the uses and purposes therein
mentioned, and on oath stated that he was authorized to
execute said instrument .
Given under my hand and official seal this k-1.•
day of , 1982.
1Q
No r Public in and for the
St to Washington, residing
at
12/17/82
7792B 6
• Z
•
•
•
STATE OF WASHINGTON )
ss .
COUNTY OF KING • •
On this day personally appeared before me Kenneth •
L. Thompson, to me known to be a General Partner, of
• RENTON PROPERTY ASSOCIATES, the partnership that executed
the within and foregoing instrument, and acknowledged the
said instrument t'o be the free and voluntary act and deed
of said corporation for the uses and purposes therein
mentioned, and on oath stated that he was authorized to
. execute said instrument .
Given under my hand and official seal this w.e. .. . ' .,i
day of /7 , 1982.•
•r� • l•% - ., �L• Y
vv GI -
Notary Public .in and fo'r .;t�he:`• -
•
• State of Washington, resid�n�j !'� ,•'
oo • at A;:, i . .
•
•
•
STATE OF WASHINGTON . )
• ) ss.
COUNTY OF KING - )
•
On this day personally appeared before me Merton
Cohen, to me known to be a General Partner, of RENTON
PROPERTY ASSOCIATES, the partnership that executed the
within' and foregoing instrument, and acknowledged the said
instrument to be the free and voluntary act and deed of
said corporation -for the uses and purposes therein
mentioned, and on oath stated that he was authorized to
execute said instrument .
•
Given under my hand and official seal this .nl C>
• day of l,) ,6(i, , 1982. .
•
•
• • 4///;‘(7-.- / : . •- • :
• Notary Public in and for 'he' �'-�.r,t: •
• State s in ton ,�g»,,�• ' >
• at ti /4/. i,
•
•
•
•
•
•
•
•
•
•
12/17/82 .
7792B 7
•
STATE OF WASHINGTON )
) • ss .
COUNTY OF KING )
•
On this ,day personally appeared before me Ronald
G. Neubauer, to me known to be a General Partner, of
JAG-RENTON ASSOCIATES, the partnership that executed the
within and foregoing instrument, and acknowledged the said •
instrument to be the free and voluntary act and. deed of
said corporation for the uses and purposes therein •
mentioned, and on oath stated that he was authorized to ••
execute said instrument .
•
Given un9fer my hand and official seal this ' e;2- - .
day o Jf �� l�� 'G'�982. `_ ,','�� e,
4 Not y P,ubl is in •a d for the
S to Wa�}� n ton, residing
at � _�.,
•
•
STATE OF WASHINGTON . • . )
F ) ss.
COUNTY OF KING ) •
On this day personally appeared before me Delton
J. Bonds, to me known to be a General Partner, of
JAG-RENTON ASSOCIATES, the partnership that executed the
within and foregoing instrument, and acknowledged the said
instrument to be the free and voluntary act and deed of
said corporation for the uses and purposes therein
mentioned, and on oath stated that he was authorized to
execute said instrument.
/Given upder my hand and official seal this
day of , ,t;,e40, w.— , 1982. .
v • ••, •
•
•
•
•
No ryPubl is id for he.�``•�„''r
State o Jn] sh , resi•c ii•v' `�� ! •'
•
•
•
•
12/17/82
7792B 8 •
STATE OF WASHINGTON )
ss .
COUNTY OF KING )
On this day personally appeared before me Kenneth
L. Thompson, to me known to be a General Partner, of
JAG-RENTON ASSOCIATES, the partnership that executed the
within and foregoing instrument, and acknowledged the said
instrument to be the free and voluntary act and deed of
said corporation for the uses and purposes therein
mentioned, and on oath stated that he was authorized to
execute said instrument .
•
Given under my hand and official seal this • ) %1
day of /) , 1982.
/<Z
Notary Public iii and for ,..t•l
State of Washington, resi, ing • .• ,
at ////- A"/. //--//%) 4
c GO
) J /
STATE OF WASHINGTON ) i'
ss.
COUNTY OF KING )
On this day personally appeared before me Merton
Cohen, to me known to be a General Partner, of JAG-RENTON
ASSOCIATES, the partnership that executed the within and
foregoing instrument, and acknowledged the said instrument
to be the free and voluntary act and deed of said
corporation for the uses and purposes therein mentioned,
and on oath stated that he was authorized to execute said
instrument .
•'iven u er my hand and official seal this '
day of /VQ�-C?21,v�`, �1982 .
ary' Public ' n / nd for the
State/0,1p ton, residing;} 'r++
at c u:
r y fi +,
12/17/82
7792E 9
•
STATE OF WASHINGTON
ss .
COUNTY OF KING )
On this day personally appeared before me 7%�.,`(,
!e /1/1:1 u. e ,i a n d
, to me known to be
the /"'4 4 s , 4,f a�� t and ,
respectively, of JOHN B. HANSEN, INC. , the corporation
that executed the within and foregoing instrument, and
acknowledged the said instrument to be the free and
voluntary act and deed of said corporation for the uses
and purposes therein mentioned, and on oath stated that he
was authorized to execute said instrument, and that the
seal affixed is the corporate seal of said corporation.
Given under my hand and official seal this ;' z
day of /) c.ek , e r • , 1982.
0
0
Notary Public in and for the
� '\\ i't T Stateeof 31ashington, residing
at 1.i ;✓/e ✓ k -e.
U `<< t 1 • •
f ,o►1n1�
.'4 ip 1(1 • ,r-•
•
STATE OF WASHINGTON )
ss .
COUNTY OF KING )
On this day personally appeared before me Jeanne B.
Hansen to me known to be Secretary-Treasurer of JOHN R. HANSEN,
INC. , the corporation that executed the within and foregoing
instrument, and acknowledged the said instrument to be the free
and voluntary act and deed of said corporation for the uses and
purposes therein mentioned, and on oath stated that she was
authorized to execute said instrument, and that the seal affixed
is the corporate seal of said corporation.
Given under my hand and official seal this 31st day of
December, 1982.
Notary. Public in and=?foax�, he`'
State of Washington lin6.Y
at King County. •• •''
12/17/82
7792B 10
•
•
•
• • • . 1 OF 2
EXHIBIT 1 TO
AGREEMENT •
•
PARCEL A: •
THAT PORTION OF THE, SOUTHWEST QUARTER OF SECTION .13,. TOWNSHIP 23 •
. NORTH, RANGE 4 EAST, W.H., IN KING COUNTY, WASHINGTON; AND
THAT PORTION OF *JUNCTION ADDITION TO CITY OF SEATTLE, ACCORDING TO Th
PLAT RECORDED IN VOLUME 12 OF PLATS, PAGE 75, IN KING COUNTY,
; WASHINGTON, TOGETHER WITH VACATED STREETS ADJOINING WHICH WOULD ATTAC
0 TO SAID PREMISES BY OPERATION OF LAW, AND OF C. E. BROWNELL'S DONATIC
CLAIM NO. 41. AND OF THAT PORTION OF TRACT 26, RENTON SHORE LANDS 2N0
SUPPLEMENTAL, DESCRIBED AS FOLLOWS: •
•
000 BEGINNING AT THE SOUTH QUARTER CORNER OF SAID SECTION 13; THENCE NORT
00°58'28" EAST• ALONG THE NORTH-SOUTH CENTERLINE OF SAID SECTION 13 A
DISTANCE OF 884.84 FEET TO THE SOUTHEAST CORNER OF TRACT 26 OF RENTON
SHORELANDS SECOND SUPPLEMENTAL MAPS, 1958; THENCE SOUTH 72°37 '52" WES'
ALONG THE SOUTH BOUNDARY OF SAID TRACT 26 A DISTANCE OF 382.60 FEET;
THENCE NORTH 70°54'02" WEST ALONG SAID SOUTH . BOUNDARY OF TRACT 26 A
DISTANCE. OF. 73:50 FEET. TO THE EAST LINE .OF THE CHARLES BROWNELL
DONATION LAND CLAIM NO. 41 AND THE TRUE POINT OF BEGINNING; THENCE
CONTINUING NORTH 70054'02" WEST ALONG SAID SOUTH BOUNDARY OF TRACT 26
DISTANCE OF 281.02 FEET; THENCE SOUTH 73°56'O1" WEST ALONG SAID SOUTH
BOUNDARY OF TRACT 26 A DISTANCE OF 130.08 FEET; THENCE SOUTH 41°16'07'
WEST ALONG SAID SOUTH BOUNDARY OF TRACT 26 A DISTANCE OF 316.18 FEET
THE NORTH BOUNDARY OF A TRACT OF LAND DEEDED TO KING COUNTY AND
DESCRIBED UNDER KING COUNTY AUDITOR'S FILE ND. 6607786; THENCE
WESTERLY ALONG SAID NORTH BOUNDARY ON A CURVE TO THE LEFT, THE CENTER
OF WHICH BEARS SOUTH 39°41'39" WEST HAVING A RADIUS OF 627.46 FEET AN
• ARC DISTANCE OF 434.70 FEET THROUGH A CENTRAL ANGLE OF 39°41'39";
THENCE NORTH A DISTANCE OF 25.00 FEET ALONG SAID NORTH BOUNDARY;
THENCE WEST A DISTANCE OF 280.69 FEET ALONG SAID NORTH BOUNDARY;
THENCE SOUTH 59°53'47" WEST ALONG SAID NORTH BOUNDARY A DISTANCE OF
377.52 FEET; . THENCE SOUTH..74°13.'19"_WEST._ ALONG SAID NORTH BOUNDARY A
• DISTANCE OF 443.31 FEET TO THE NORTHERLY MARGIN OF THE CHARLES MONSTER
COUNTY ROAD; THENCE NORTH 34°18'31" WEST ALONG SAID NORTHERLY MARGIN A
DISTANCE OF 43.46 FEET TO THE SOUTH LINE OF THE BURLINGTON NORTHERN
RAILROAD RIGHT-OF-WAY; THENCE ALONG A CURVE TO THE LEFT, ALONG SAID
SOUTH LINE, THE CENTER OF WHICH BEARS NORTH 06°34'41" WEST HAVING A
RADIUS OF 696.00 FEET, AN ARC DISTANCE OF 45.43 FEET THROUGH A CENTRAL
ANGLE OF 03°44'25" TO A POINT OF COMPOUND CURVE; THENCE ALONG A CURVE
TO THE LEFT, ALONG SAID SOUTH LINE, THE CENTER OF WHICH BEARS NORTH
10°19'06" WEST HAVING A RADIUS OF 1 .055.00 FEET, AN ARC DISTANCE OF
• 209.95 FEET THROUGH A CENTRAL ANGLE OF 11°24' 08" TO A POINT OF COMPOUN
CURVE; THENCE ALONG A CURVE TO THE LEFT, ALONG SAID SOUTH LINE, THE
CENTER OF WHICH BEARS NORTH 21°43'14" WEST HAVING A RADIUS OF 727.00
FEET, AN ARC DISTANCE OF 214.77 FEET THROUGH A CENTRAL ANGLE OF
16°55'35" TO A POINT OF COMPOUND CURVE; THENCE ALONG A CURVE TO THE
LEFT, ALONG SAID SOUTH LINE, THE CENTER OF WHICH BEARS NORTH 38°38'49"
2 OF 2
WEST HAVING A RADIUS OF 1,571.00 FEET, AN ARC DISTANCE OF 206.57 FEET
. THROUGH A CENTRAL ANGLE 'OF 07.032'02" TO A POINT OF TANGENCY; THENCE
NORTH 43°49'09" EAST ALONG SAID SOUTH LINE A DISTANCE OF 97.17 FEET TI
A LINE 35 FEET SOUTHERLY OF AND PARALLEL WITH THE CENTERLINE OF THE
EXISTING MOST SOUTHERLY TRACK OF THE CHICAGO, MILWAUKEE, ST. PAUL A4T
PACIFIC RAILROAD TRACKS; THENCE ALONG SAID PARALLEL LINE ON A CURVE T[
THE RIGHT, THE CENTER OF WHICH BEARS SOUTH 42°43' 18" EAST HAVING A
RADIUS OF 696.89 FEET, AN ARC DISTANCE OF 40.09 FEET THROUGH A CENTRAL
ANGLE OF 03°17'45"; THENCE NORTH 50°34'27" EAST ALONG SAID PARALLEL
LINE A DISTANCE OF 248.50 FEET; THENCE ALONG SAID PARALLEL LINE ON 11
CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH 39°25'33" EAST
HAVING A RADIUS OFI676.58 FEET, AN ARC DISTANCE OF 93.64 FEET THROUGH{
CENTAL ANGLE OF 07°55'47" TO A POINT OF REVERSE CURVE; THENCE ALONG
SAID PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS
NORTH 31°29 '46" WEST HAVING A RADIUS OF 428.64 FEET, AN ARC• DISTANCE 0
0 73.32 FEET THROUGH-A CENTRAL ANGLE OF. 09°48 '04" TO A POINT OF REVERE
CURVE; THENCE ALONG' SAID PARALLEL LINE ON A CURVE TO THE RIGHT, THE
O CENTER OF WHICH• BEARS SOUTH 41°17'50" EAST HAVING A RADIUS OF 2,580.74
FEET, AN ARC DISTANCE OF 437.40 FEET THROUGH A CENTRAL ANGLE OF
,i) 09°42'39" TO A POINT OF COMPOUND CURVE; THENCE ALONG SAID PARALLEL LINT
ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH 31°35'11"
EAST HAVING A RADIUS OF 2,790.19 FEET, AN ARC DISTANCE OF 789.44 FEET
THROUGH A CENTRAL ANGLE OF 16°12'39" TO THE EAST LINE OF THE CHARLES
BROWNELL DONATION LAND CLAIM NO. 41 ; THENCE SOUTH O1°24'04" WEST AL G
SAID EAST LINE A DISTANCE OF 950.58 FEET TO THE TRUE POINT OF
. BEGINNING.
•
•
•
•
•
•
•
•
' 1 • .` r ,'��.�.�yl,(';1.L'y' �r� %,* .�:', ! ,'�'"�'t4•°!'•41`j{� �., r' i%•? , .�� • ,r. ��,r .•{;',1 r.;% r.,f O.
•
•
1 OF 3
•
EXHIBIT 2 TO •
AGREEMENT . •
•
•
•
PARCEL B:
1,0
C THAT PORTION OF Co E. BROWNELL'S DONATION CLAIM NO. 41, AND OF THE
SOUTHWEST QUARTER AND THE SOUTHEAST QUARTER OF SECTION 13, TOWNSHIP 2
O NORTH, RANGE 4 EAST, W.M., IN KING COUNTY, WASHINGTON, DESCRIBED AS
FOLLOWS:
QD
BEGINNING AT THE SOUTH QUARTER CORNER OF SAID SECTION 13; THENCE NORT!
00°58'28" EAST ALONG THE NORTH—SOUTH CENTERLINE OF SAID SECTION 13 A
DISTANCE OF 884.84 FEET TO THE SOUTHEAST CORNER OF TRACT 26 OF RENTOI
SHORELANDS SECOND SUPPLEMENTAL MAPS, 1958; THENCE SOUTH 72°37'52" WES1
ALONG THE SOUTH BOUNDARY OF SAID TRACT 26 A DISTANCE OF 382.60 FEET;
THENCE NORTH 70°54'02" WEST- ALONG SAID SOUTH BOUNDARY OF TRACT 26 A
DISTANCE OF 73.50 FEET TO THE EAST LINE -OF THE CHARLES BROWNELL
DONATION LAND CLAIM ND. 41; THENCE NORTH. 01°24'04" EAST ALONG SAID
EAST LINE OF THE CHARLES BROWNELL DONATION LAND CLAIM NO. 41 A DISTA.ZI
OF 950.58 FEET TO A LINE 35 FEET SOUTHERLY OF AND PARALLEL WITH THE
CENTERLINE OF THE .EXISTING MOST SOUTHERLY TRACK OF THE CHICAGO,
MILWAUKEE? ST. PAUL E PACIFIC RAILROAD TRACKS AND THE TRUE POINT OF
BEGINNINGp THENCE WESTERLY ALONG SAID PARALLEL LINE ON A CURVE TO TIE
LEFT, THE CENTER OF WHICH BEARS SOUTH 15°22 '32" EAST HAVING• A RADIUS 1f
2790.19 FEET, AN ARC DISTANCE OF 789.44 FEET THROUGH A CENTRAL ANGLE M
16°12'39" TO A POINT OF COMPOUND CURVE";\ THENCE CONTINUING ALONG SAID
.fir ,
•
2 OF 3
PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS SOUTH
31°35'11" EAST HAVING A RADIUS OF 2580.74 FEET, AN ARC DISTANCE OF
437.40 FEET THROUGH A CENTRAL ANGLE OF 09°42'39" TO A. POINT OF REVERS'
CURVE; THENCE CONTINUING ALONG SAID PARALLEL LINE ON A CURVE TO THE
RIGHT, THE CENTER OF WHICH BEARS NORTH 41°17' 50" WEST HAVING A RADIUS
OF 428.64 FEET, AN ARC DISTANCE OF 73.32 FEET THROUGH A CENTRAL ANGLE
OF 09°48'04" TO A POINT OF REVERSE CURVE; THENCE CONTINUING ALONG SAI1
PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS SOUTH
31°29'46" EAST HAVING A RADIUS OF 676.58 FEET, AN ARC DISTANCE OF 93.1
FEET THROUGH A CENTRAL ANGLE OF 07°55'47" TO A . POINT OF TANGENCY;.
THENCE CONTINUING ALONG' SAID PARALLEL 'LINE SOUTH 50°34'27" WEST A
DISTANCE OF 248.50 FEET TO A POINT OF CURVE ; THENCE CONTINUING ALONG
SAID PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS .
SOUTH 39°25'33" EAST HAVING A RADIUS OF 696.89 FEET, AN ARC DISTANCE
'47) . 40.09 FEET THROUGH A CENTRAL ANGLE OF 03°17 '45" TO THE SOUTH LINE OF
THE BURLINGTON NORTHERN RAILROAD RIGHT-OF-WAY; THENCE NORTH 43°49'09"
EAST ALONG SAID SOUTH LINE A DISTANCE OF 173.83 FEET TO A POINT OF
CURVE; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE
RIGHT, THE CENTER OF WHICH BEARS SOUTH 46°10' 51" EAST HAVING A RADIUS
OF 4030.00 FEET, AN ARC DISTANCE OF 197.57 FEET THROUGH A CENTRAL ANGL
CID OF 02°48'32" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAI
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
43°22'19" EAST HAVING A RADIUS OF 1853.00 FEET, AN ARC DISTANCE OF
194.75 FEET THROUGH A CENTRAL ANGLE OF 06°01' 18" TO A POINT OF COMPOUN
CURVE; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE RIGHT
THE CENTER OF WHICH BEARS SOUTH 37°21'O1" EAST HAVING A RADIUS OF
10543.00 FEET, AN ARC DISTANCE OF 186.51 FEET THROUGH A CENTRAL ANGLE'
OF O1°00'49" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAII
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
36°20'12" EAST HAVING A RADIUS OF 1657.00 FEET AN ARC DISTANCE OF
193.93 FEET THROUGH A CENTRAL ANGLE OF, 06°42'20" TO A POINT OF COMPOUN
CURVE; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE RIGHT
THE CENTER OF WHICH BEARS SOUTH 29°37'52" EAST HAVING A RADIUS OF
6738.00 FEET, AN ARC DISTANCE OF 197.76' FEET THROUGH A CENTRAL ANGLE 0
O1°40'54" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
27°56'58" EAST HAVING A RADIUS OF 1768.00 FEET, AN ARC DISTANCE OF
194.45 FEET THROUGH A CENTRAL ANGLE OF 06°18'06" TO A POINT OF COMPOUNI
CURVE; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE RIGHT,
THE CENTER OF WHICH BEARS. SOUTH 21°38'52" EAST HAVING A RADIUS OF
8603.00 FEET, AN ARC DISTANCE OF 204.54 FEET THROUGH A CENTRAL ANGLE 01
O1°21'44" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
20°17'08" EAST HAVING A RADIUS OF 1922.10 FEET, AN ARC DISTANCE OF
178.79 FEET THROUGH A CENTRAL ANGLE OF 05°19'46" TO A POINT OF COMPOUN(
CURVE ON THE EAST LINE OF SAID CHARLES BROWNELL DONATION LAND CLAIM NO.
41; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE RIGHT,
THE CENTER OF WHICH BEARS SOUTH 14°57'22" EAST HAVING A RADIUS OF
2814.93 FEET, AN ARC DISTANCE OF 659.42 FEET THROUGH A CENTRAL ANGLE OF
13°25'19" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
• • , . 3 OF 3
O1°32 '03" EAST HAVING A RADIUS OF 1165.09 FEET, AN ARC DISTANCE OF
1097.05 FEET THROUGH A CENTRAL ANGLE OF 53°57 '00" TO A POINT OF
TANGENCY; THENCE CONTINUING ALONG SAID SOUTH LINE SOUTH 37°35'03" El
A DISTANCE OF 308.70 FEET TO A POINT OF CURVE; THENCE CONTINUING AL(
SAID SOUTH LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS
NORTH 52°24'57n EAST HAVING A RADIUS OF 1005.37 FEET, AN ARC DISTAN(
OF 45.82 FEET THROUGH A CENTRAL ANGLE OF 02°36'41" TO A LINE 35 FEE1
SOUTHERLY OF AND PARALLEL WITH THE CENTERLINE OF THE EXISTING MOST
SOUTHERLY TRACK OF THE CHICAGO, MILWAUKEE, ST. PAUL E PACIFIC RAILRC
TRACKS; THENCE WESTERLY ALONG SAID PARALLEL LINE NORTH 40°11'44" WE5
DISTANCE OF 126.24 FEET TO A POINT OF CURVE; THENCE CONTINUING ALONG
SAID PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS
SOUTH 49°48'16" WEST HAVING A RADIUS OF 1829.78 FEET, AN ARC DISTANC
. SOUTH
309.67 FEET THROUGH A CENTRAL ANGLE OF 09°41 '48"; THENCE NORTH
49°53'32" WEST ALONG SAID PARALLEL LINE A DISTANCE OF 167.07 FEET TO
POINT OF CURVE; THENCE CONTINUING ALONG SAID PARALLEL LINE ON A CURV
TO THE LEFT, THE CENTER OF WHICH BEARS SOUTH 40°06' 28" WEST HAVING A
in RADIUS OF 1102.46 FEET, AN ARC DISTANCE OF 807.11 FEET THROUGH A
CENTRAL ANGLE OF 41°56'46" TO A POINT OF COMPOUND CURVE; THENCE
CONTINUING ALONG SAID PARALLEL LINE ON A CURVE TO THE LEFT, THE CENT
• OF WHICH BEARS SOUTH O1°50' 18" EAST HAVING A RADIUS OF 2790.19 FEET,
ARC DISTANCE OF 659.24 FEET THROUGH A CENTRAL ANGLE OF 13°32' 14" TO
THE TRUE POINT OF BEGINNING.
•
•
•
•
•
•
•
•
•• .iL.u• r •m.& NCi.;7.h.'i•i. d._ �c.1•..i' .�• . .... ..:.c._Li.: d. _!' a•i.r► 4 .c
loft
EXHIBIT 3
Cr) TO AGREEMENT
C'D
III
If) PARCEL "C"
THAT PORTION OF TRACT 25, RENTON SHORELANDS SECOND
p SUPPLEMENTAL; AND
THAT PORTION OF THE SOUTHEAST QUARTER OF SECTION ' 13, AND THE
SOUTHWEST QUARTER OF SECTION 13 IN TOWNSHIP 23 NORTH, RANGE 4 EAST
W.M., AND THE SOUTHWEST QUARTER OF SECTION 18, TOWNSHIP 23 NORTH,
RANGE 5 EAST W.M. IN KING COUNTY, WASHINGTON DESCRIBED AS FOLLOWS:
BEGINNING AT TI-1E SOUTH QUARTER CORNER OF SAID SECTION 13; THENCE
NORTH 00°58'28" EAST ALONG THE NORTH-SOUTH CENTERLINE OF SAID SECTION
13, A DISTANCE OF' 884.84 FEET TO THE SOUTHEAST CORNER OF TRACT 26 OF
RENTON SHORELANDS SECOND SUPPLEMENTAL MAPS, 1958, AND THE TRUE POINT
OF BEGINNING; THENCE SOUTH 72°37'52" WEST ALONG THE SOUTH BOUNDARY OF
SAID TRACT 26, A DISTANCE OF 382.60 FEET; THENCE NORTH 70°54'02" W EST
ALONG THE SOUTH BOUNDARY OF SAID TRACT 26, A DISTANCE OF 73.51 FEET TO
THE EAST LINE OF THE CHARLES BROWNELL DONATION LAND CLAIM NO. 4];
THENCE NORTH 01°24'04" EAST ALONG SAID EAST LINE, A DISTANCE OF 950.58
FEET TO A LINE 35 FEET SOUTHERLY OF AND PARALLEL WITH THE CENTERLINE
OF THE EXISTING MOST SOUTHERLY TRACK OF THE CHICAGO, MILWAUKEE, ST.
PAUL AND PACIFIC RAILROAD TRACTS; THENCE ALONG SAID LINE 35 FEET
SOUTHERLY OF AND PARALLEL WITH THE CENTERLINE OF THE MOST SOUTHERLY
TRACK, ALONG A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
15°22'32" EAST, HAVING A RADIUS OF 2,790.19 FEET, AN ARC
- - .
2 OF 2
•
•
•
DISTANCE OF 659.24 FEET THROUGH A CENTRAL ANGLE OF 13°32' 14"
TO A POINT OF COMPOUND CURVE;
THENCE ALONG A CURVE TO THE RIGHT, ALONG SAID PARALLEL LINE,
THE CENTER OF WHICH BEARS SOUTH 01°50° 18" EAST HAVING A
RADIUS OF 1,102.46 FEET, AN ARC DISTANCE OF 807.11 FEET
THROUGH A CENTRAL ANGLE OF 41°56'46"; THENCE SOUTH 49°53'32"
�.' EAST, ALONG SAID PARALLEL LINE, A DISTANCE OF 167.07 FEET;
THENCE ALONG A CURVE TO THE RIGHT, ALONG SAID PARALLEL LINE, .
i; n HAVING A RADIUS OF 1,829.78 FEET, AN ARC DISTANCE OF 309.67
p FEET THROUGH A CENTRAL ANGLE OF 09°41 '48" ; THENCE
O LEAVING SAID PARALLEL LINE, SOUTH 40°11 °44" EAST, A
' DISTANCE OF .126.24 FEET TO A POINT ON THE SOUTH LINE OF THE
BURLINGTON NORTHERN RAILROAD RIGHT-OF-WAY;
THENCE ALONG A CURVE TO THE LEFT, ALONG SAID SOUTH LINE, THE
CENTER OF WHICH BEARS NORTH 49°48'16" EAST HAVING A RADIUS
OF 1,005.37 FEET, AN ARC DISTANCE OF 549.02 FEET THROUGH A
CENTRAL ANGLE OF 31°17 '19" TO A POINT OF TANGENT ON SAID
SOUTH LINE OF THE BURLINGTON NORTHERN RAILROAD RIGHT-OF-WAY;
THENCE CONTINUING ALONG SAID SOUTH LINE, SOUTH 71°29'03"
EAST ALONG A LINE 50 FEET SOUTH OF AND PARALLEL WITH THE
EXISTING SOUTHBOUND TRACK,-A DISTANCE OF 826.56 FEET- TO THE
WEST LINE OF SAID SECTION 18.; THENCE CONTINUING ALONG . SAID
. SOUTH LINE SOUTH 71°29 '03" EAST, A DISTANCE OF .85.52 FEET TO THE
NORTH LINE OF THE SOUTH 650 FEET OF THE SOUTHWEST QUARTER OF
THE SOUTHWEST QUARTER OF SAID SECTION 18; THENCE NORTH
89°10'25" WEST''ALONG THE NORTH LINE OF SAID SOUTHWEST QUARTER
OF THE SOUTHWEST QUARTER OF SECTION 18, A DISTANCE OF 81.57
FEET TO THE EAST LINE OF .THE SOUTHEAST QUARTER OF SAID SECTION -
13; THENCE NORTH 88°15 '00" WEST ALONG THE NORTH LINE OF THE
NORTH 650 FEET OF THE SOUTHEAST QUARTER OF SAID SECTION 13, - -
A DISTANCE OF 2,261 .41 FEET TO AN ANGLE POINT ON THE SOUTH
BOUNDARY OF TRACT 25 .0F RENTON SHORE LANDS, 1958; THENCE
NORTH 33°07 '25" WEST ALONG SAID SOUTH BOUNDARY, A DISTANCE
OF 154.51 FEET TO AN ANGLE POINT; THENCE NORTH 27°21'32"
EAST ALONG SAID SOUTH BOUNDARY, A DISTANCE OF 387.32 FEET
TO AN ANGLE POINT; THENCE NORTH 83°17 '25" WEST ALONG SAID SOUTH •
BOUNDARY, A DISTANCE OF-171.17 FEET-;---THENCE -SOUTH. 46°22 '2212-- - - -
WEST ALONG SAID SOUTH BOUNDARY, A DISTANCE OF 324.66 FEET; --
THENCE SOUTH '72°37'52" WEST ALONG SAID SOUTH BOUNDARY, A
DISTANCE OF 76.33 FEET TO THE TRUE POINT OF BEGINNING.
•
.. r '7... ,.,. . .. .r..y•',.). 'iJ.'.w v_ .e ... .....ft. -..-- -_ . .f i. •. ..}b.. --.._ _u.. ._.. . .. ._. _...___.._..0 ... .r-._.. _►t.... . _ .....•
t
• 2
. -
•
•
EXHIBIT 4 TO
. AGREEMENT
•
The Company has not surveyed the premises described in _-�=L...
The sketch below is furnished without charge solely for liability he pose or ofin assis ss rating
no
in locating said premises and the Company assumes
cies
therein. It does.not purport to show all highways, roads and easements adjoining
2 or affecting said premises.
Z I
.
I VI D• I . 0.
( ' j G ' -
9 , .
v • `•- ' v
1 6 I
. • .
._
It
1
, .. .
i.
• `� 1 _ _
1
. 1 i
i A %A '.. • 4
• I ``� o
\;ati`‘` !
•
- -- - 9 I A
k . . : . - -
i� \ • r
�� - • •
1 `. .
I i ' .
. t
i .
I • - .4. 1
I5
• ( , '4 - I
it. .
, (- . 9
. • . . ' \ (•� C •
• -- — — —"\ • IMZCN L7NC.. •
II
•
.• a••.. w --..�•• d:..a.•..•.J f•w•i/ r�••}•...•4r _..M_.__., - ..a•a� • .. ►�..�... . ..r. 4•4. .1.. -. _ ......_:..I..f(••*"41.01:.4..�.trtfiLb .
1
•
•
In •
41 �LL oZ�
•
The Company has not surveyed the premises described in
ri The sketch below is furnished without charge solely for the purpose of assisting
-3 in locating said premises and the Company assumes no liability for inaccuracies
0 ' therein. It does not purport to show all highways, roads and easements adjoining
or affecting said premises. '1 �\
Q .
; •
___,‘ 1....E.Lc_IN 1.____.1_,kie:„ _ _____ ____ _ _
IP
§. '
•
U G I i------% \ . . .
r
I
i- --- - ' ' t`/ 7Zatit Zva p .
LCY3�! J D
-4 .
/ I -1
/ N o i . 5
I / • a
L
I . • .
•
-• • • .
• __
•
i•
•I
. l
I •
•
A0 _ �� .. .V a
.1111
• EXHIBIT 5 TO
AGREEMENT
•
That portion of the..south_half of Section 13, Township 23 North, Range 4 East, W.H.
In King County; Washington and of Junction Addition to the City of Seattle, according
to plat recorded in Volume 12 of Plats, page 75, records of said King County, and of
C.E. Brownell's Donation Claim No. 41 described as follows:
•
7 Beginning at the south quarter corner of said Section 13;
thence NOO°58'28"E along
the north-south centerline thereof 1092.82 feet; thence N68°03 '54"E 224.45 feet to
the TRUE POINT OF BEGINNING; thence S68°03'54"W 575.56 feet; thence N72°04'34"W
389.92 feet; thence 568°06'46"W 429.32 feet; thence south 85.47 feet to a point of
curve; thence on a curve to the left, having a radius of 60.00.feet, thru a central
O angle of 126°52' 10", an arc distance of 132.86 feet; thence N53°07'50"E 199.18 feet
to a point of curve; thence on a curve to the right, having a radius of 200.00 feet
thru a central angle of 53°59'30", an arc distance of 188.47 feet; thence S72°52'40"E
290.00 feet to a point of curve; thence on a curve to the left, having a radius of
197.00 feet, thru a central angle of 39°08'51", an arc distance of 134.60 feet; thence
N67°58'29"E 380.92 feet; thence N31°27'12"E 204.86 feet to the TRUE POINT OF BEGINNING,
Containing 165,263 square feet or 3.794 acres more or less.
•
•
•
•
1V,a f.l fry. N.• M,`._o •.. r.�,• ►J w.•i w,l �. w .:. :w.'..I ,'.A1.A..1_,l w.:•.�....� ..._ _... . . , _ ,. ._ _ _ _
EXHIBIT 6 TO
AGREEMENT
That portion of the south half of Section 13, Township 23 North, Range 4 East, W.M.
in King County, Washington, of Junction Addition to the City of Seattle, according
to the plat recorded in Volume 12 of Plats, page 75, records of said King County,
and of C.E. Brownell 's Donation Claim No. 41 , described as follows:
Beginning at the south quarter corner of said Section 13; thence NDO°58'28"E along
the north-south centerline thereof 1092.82 feet; thence 568°03'54"W 351. 11 feet to
the TRUE POINT OF BEGINNING; thence N68°03'54"E 575.56 feet; thence N12°01 '00"W
40.75 feet; thence S77°59'00"W 133.01 feet to a point of curve; thence along a
curve to the right having a radius of 230.00 feet, through a central angle of
27°47'31" an arc distance of 111.56 feet to a point of compound curvature; the
`' center of said curve bears N15°46'31"E 160.00 feet; thence along said curve to the
right, through a central angle of 70°48' 19" an arc distance of 197.73 feet; thence
V.) S82°15'00"W 67.68 feet; thence S3I°32'22"W 71 .06 feet; thence N81°11135"W 193.00
feet; thence S82°15'00"W 92.99 feet; thence 535°29'30"W 143. 18 feet; thence
N74°44'00"W 84.85 feet; thence 560°16'00"W 67.00 feet; thence 512°16'00"E 97.35
Q feet; thence N68°06'46"E 53.79 feet to a point which bears N72°04'34"W from the
'-r
Q TRUE POINT OF BEGINNING; thence S72°04'34"E 389.92 feet to the TRUE POINT OF
VI BEGINNING.
Containing 182,206 square feet or 4. 1829 acres more or less.
•
•
• TRIAD ASSOCIATES
11416 N.E. 128TH STREW WRITTEN BY cJ_M
, KIRKLAND, WA 8803$
CHECKED Gi(
COMPAREDi\"\\\\
• •
•
EXHIBIT 7 TO.:
• AGREEMENT . •
That portion of the southwest quarter of Section 13, Township 23 No'rth, Range 4 East,
W.H. in King County, Washington and that portion of Junction Addition to City of
Seattle, according to plat recorded in Volume 12 of Plats, page 75, records of said
King County, together with vacated streEts adjoining which Bfownell 's DonationuClaimld tNoh 41,to Sdesaid
cribed
� premises by operation of' law,_and of C.E.
•
as follows:. . •
0
Beginning at the south quarter corner of •
,said Section 13; thence NOO°58'28"E along
the north-south centerline thereof 884.84 feet to the southeast corner of Tract 26,
�-1 1958; thence 572°37'S2"�� 382•60 feet to
Renton Shoreiands Second Supplemental Maps
CO an angle point in the south line of said Tract 26; thence N70°54'02"W 354.53 feet to
t to
. • an angle point in the south line of said Tract 26; thence.S41°]6'07"M► along the esouth
an angle point in the south line of
line of said Tract 26 a distance of 316.18 feet
Kin the
Countynorth
Recordingboundary
Numbert6607786;
ract of
land deeded to King County; and described under 9
thence westerly along said north boundary on a curve to the left, thearccent which
ncchof
bears S39°41 '39"W 627.46 feet, thru a central, ang le of 39 1 39 ; anthence westd rtaancg
434.70 feet; thence north along said north boundary 25.00 feet;
said north boundary 245.69 feet to the TRUE POINT OF BEGINNING; thenceonorths156.13ly
feet;' thence N50°39'19"E 330.21 feet; thence N33°00'54"W 109• on
7 er
margin of the Burlington Northern Rao2roao��Ei9853°OO,feet;said
thencent westerlying aajongtsaid
a curve, the center which bears. 539 3 an arc
southerly margin and curve to the left, thru a central angle of 3°59'19".
distance of 129.00 feet to a pointof compound curve, the center of said curve bears
S43°22' 19"E 4030.00 feet; .thence westerly along said southerly margin and curve to
the left, thru a central angle of 2°48'32", an arc distance of 197.5
7
of tangency; thence S43°49'09"W along said south margin 271.00 feet to a point of
curve; thence on a curve to the right along said"Southerl an arc y
e hoaving 6.a radieus
to
of 1571.00 feet, thru a central angle of 7 3 0
a point of compound curve,ithe center which bears N38°38'49"W 727.00 feet; thence
westerly along said southerly margin and curve to the right, thru a central angle of
16°55'35", an arc distance of 214.77 feet to a point of compound curve, the center
which bears N21°43'14"W 1055.00 feet; thence westerly along said southerly margin
and curve to the right, thru a central angle of 11°24'08", an arc distance of 209.95
feet to a point_of com_ pound curve; the center which bears N10°19'061'14 696.00 feet;
thence westerly along said southerly margin and curve•to the right thru a central of _
3°44'25", an arc distance of 45.43 feet to the easterly margin
offtthe
et ChCharles
nMonster
County Road; thence S34°18'31"E along said easterly margin6
boundary of said tract deeded to King County and described under King County Record-
ing Number 6607786; thence N74t 13 19 E along said north boundary 443.31 feet; thence
t�59°53'47"E along said north boundary 77. ; thence east along said north
boundary 35.00 feet to the TRUE POINT OF BEGINNING.
Containing 114,401 square feet or 2.626 acres more or less.
•
•
•
•i i 'h: :.. 1. r c� �+ .� ,y �� 'f• 'i.',i ,;!
r � �.t. •� .'• t 1 Y:�..M'. .i'��"IZ .': '��f'ri:!i .41't•.'h�l:rr�!F '..�r� Al��I•� `_j% �:a�' !!11:S,Y�% .•�+�{i�1�:N.d."�r'!'t:i+,e!�S� • �'1 i r 7
•
_ EXHIBIT 8 TO
AGREEMENT.
•
r_._. • . ..�___ . _.
That portion of the south half of Section 13, Township 23 North, Range 4 East, W.H.
In King County, Washington; and of Junction Addition to the City of Seattle, according
to the plat recorded in Volume 12 of Plats, page 75, records of said_ King _County,
together with vacated streets adjoining which would Nattao. ch to odsaidTpremisrctses bydes by opera
Cr) tion of Law; and of C.E: Brownell s Donation Cl� ScrTbed as follows:
Renton Shore Lands 2nd Supplemental flaps 1958, described
CD
Beginning at the south quarter corner of said Section 13; thence N00°58128"E along the
0
ri north-south centerline thereof 1092.82 feet; thence N68°03154"E 224.45 feet to a point
A hereinafter called "Point A"; thence 568°03'54"W 575.56. feet; thence N72°04'34"ll
Cl
0 389.92 feet; thence S68°06'46"W 429.32 feet. to the TRUE POINT OF BEGINNING; thence .
south 85.47 feet to a point of curve; thence on a curvearcdistance having 1vg6 frad
a radius
of 60.00 feet, thru a central angle of 126 52 10 , an
thence N53°07'50"E 199.18 feet to a point of curve; thence on a curvearc
o dhetae ight,
having a radius of 200.00 feet'thru a central angle of 53°59'30", an
of
188.47 feet; thence S72°52'40"E 290.00 feet to a point of curve; thence on a curve to
the left having a radius of 197.00 feet, thru a central angle of 39°08',51", an arc
distance of 134.60 feet; thence N67°58'29"E 380.92 feet;. thence N31°27'12"E 204.86
feet to aforementioned "Point A"; thence N80°04'48"E 232.00 feet; thence 542°06'O8"E
215.00 feet; thence S31°14'05"W 356.99 feet; thence 547°10'O 1" 71 .34 feet; th
east 114.27 feet; thence south 68.91 feet to the southerly line of said Tract 25;
thence along the southerly ;line of said Tracts 25 and 26, the following courses and
distances: N88°15'00"W 180.65 feet; I133°07'25"W 154.51 feet; N27°21'32"E 387.32
feet; N83°17'25"W 171 .17 feet; S46°22'22"W 324.66 feet; 572°37'52"W 458.93 feet;
N70°54'02"W 354.53 feet; S73°56'01"W 130.08 feet; and s41°16'07"W 316.18dfeetto the
County north boundary of a tract of land deeded to King
Uner King
County Receiving Number 6607786; thence westerly along said north boundary on a curve
to the left, the center whiich bears S39°41 '39"W 627.46 feet thru a central angle of
391141 '39", an arc distance Of 434.70 feet; thence north along said north boundary
25.00 feet; thence west along said north boundary 245.69 feet; thence north 156.13 .
feet; thence N50°39' 19"E 3310.21 feet; thence 578°41 '24"E 180.00 feet to a point of
curve; thence on a curve to the right, having a radius of 195.01 feet, thru a central
angle of 78°41 '24", an-arc distance of 267.83. feet to the TRUE POINT OF BEGINNING.
Containing 382,725 square feet or 8.786 acres more or less.
•
•
i � . •J�'„l •'i�lsa )L.% . 1 r' .kvi :'M 1if t':.1!014\c11er} b'i Al ti'1+liS_'' 1 16.01
Z M•ifdr'oili•':F_. :�.T.�'�2, M� � p. -4+ t. MILS AIA-. �C.v. •:, Iti.�
EXHIBIT 9 TO
AGREEMENT
1 . The portions of the Greenbelt Property and the Flood
Control Property located within Parcel A are subject
to the following :
( i) Rights, reservations, covenants and
restrictions contained in that certain Supplemental
Agreement, recorded as Instrument No . 8012230800 in the
0) Records of King County, Washington;
O ( ii) Rights, reservations, covenants and
restrictions contained in that certain Real Estate
CD
4-1 Contract recorded as Instrument No, 8009300609 in the
CD Records of King County, Washington;
VI
QD
( iii ) Easement recorded under Instrument No.
6626569 in the Records of King County, Washington;
(iv) Easement granted to the City of Renton on
November 14, 1962, under Application No. 27583 ; and
(v) Easement granted to King County Drainage
District No. 1 on August 11, 1960, under Application No.
25422 .
2. The portion of the Greenbelt Property located within
Parcel B is subject to the following:
( i) Rights, reservations, covenants and
restrictions contained in that certain Real Estate
Contract recorded as Instrument No. 8009300611 in the
Records of King County, Washington; and
( ii ) Easement recorded under Instrument No.
6626569 in the Records of King County, Washington.
3 . The portions of the Greenbelt Property and the Flood
Control Property located within Parcel C are subject
to the following :
( i ) Rights, reservations, covenants and
restrictions contained in that certain Real Estate
Contract recorded as Instrument No . 8002220257 and in that
certain Quitclaim Deed recorded as Instrument No.
8110210021 in the Records of King County, Washington;
( ii ) Rights, reservations, covenants and
restrictions contained in that certain Real Estate
Contract recorded as Instrument No . 8004240435 in the
Records of King County, Washington;
12/27/82
7794E 1
o
a.
( iii ) Rights, reservations, covenants and
restrictions contained in that certain deed recorded under
Instrument No . 5780049 in the Records of King County,
Washington;
( iv) Easement granted to the City of Renton on
November 14, 1962, under Application No . 27583 ;
(v) Easement recorded under Instrument No.
8108200425 in the Records of King County, Washington; and
Cr) (vi) Easement granted to King County Drainage
c') District No . 1 on August 11 , 1960 , under Application No.
It) 25422 .
If
ri
0
450
•
•
ti 10 TIED3h TA 0.03.31150 4�N `ri
.mZ.311 134; tt
12/27/82
7794B 2
Renton City Council
December 27, 1982
Page 3
CORRESPONDENCE continued
Group W Cable of the franchise holder regarding service to the Housing Authority, ,
Pending Rate Carco Theatre, Tiffany Park area, as well as communication with
Increase the City's cable television consultant., In view of receipt of the
continued Seattle Hearing Examiner report and request from the Renton Housing
Authority, it was MOVED BY REED, SECONDED BY MATHEWS, THIS ISSUE
BE REFERRED TO THE COMMUNITY SERVICES COMMITTEE. CARRIED. Mayor
Shinpoch reminded Council that action must be taken by January 15
or the pending proposed rate will be approved.
continued James Robinow, General Manager of Group W Cable, explained that what
appeared to be a lack of cooperation was due partly to a change in
personnel at Group W causing him to fall behind in his correspondence.
He stated Group W would be prepared to answer all questions at the
Community Services Committee meeting. Community Services Committee
Chairman Reed announced the Committee would meet to discuss the
Group W rate increase on Tuesday, December 28, at 4:00 p.m. in the
th+rd floor conference room, Renton Municipal Building. (See later
Audience Comment.)
OLD BUSINESS
Community Community Services Committee Chairman Reed presented a report -out-
Services lining progress on the new City shop facility which is planned to
Committee go to bid in the spring of 1983. The Committee reviewed building
New City plans and layout program as well as plans for the interior"roadway
Shop Facility system and parking lot, landscaping and utilities. Onsite roadways,
Update parking lots and utility work will be advertised for bid in the
near future. Access roads to the site, Monroe NE and NE Second
Street, are under construction as a joint project with King County.
This report for Council information, no action required.
ORDINANCES AND RESOLUTIONS
Ways and Means Ways and Means Committee Chairman Stredicke presented a report
Committee recommending the following ordinances for first readings:
Alterra Corp. An ordinance was, read changing the zoning classification of
Rezone property located north of SW Seventh Street east of the proposed
R-129-80 P-1 Channel , south of the old Chicago-Milwaukee-St. Paul Railroad
and right-of-way, and west of the extension of Thomas Avenue SW from
Easement " General Classification District -(G) to Manufacturing Park (MP) ;
Agreement Alterra Corporation Rezone #R-129-80. This ordinance was accompanied
by an agreement between the City and JAG-Renton Associates and Renton
Property Associates providing for easements for greenbelt, open-space,
wildlife habitat, flood control and utilities in relationship to
the Alterra Rezone. MOVED BY STREDICKE, SECONDED BY ROCKHILL,
COUNCIL ACCEPT THE AGREEMENT BETWEEN THE CITY AND JAG-RENTON ASSOCIATES
AND RENTON; PROPERTY ASSOCIATES AS PROPOSED AND AUTHORIZE THE MAYOR
AND CITY CLERK TO SIGN SAME. CARRIED. MOVED BY STREDICKE, SECONDED
BY HUGHES, , COUNCIL SUSPEND THE RULES AND ADVANCE THIS ORDINANCE TO
SECOND AND FINAL READING. CARRIED.
Ordinance #3694 An ordinance was read changing the zoning classification of
Alterra Corp. property located north of SW Seventh- Street east of the proposed
Rezone P-1 Channel , south of the old Chicago-Milwaukee-St. Paul Railroad
R-129-80 right-of-way, and west of the extension of Thomas Avenue SW from
General Classification District (G) to Manufacturing Park (MP) ;
Alterra Corporation Rezone'#R-129-80. MOVED BY STREDICKE, SECONDED
BY HUGHES, COUNCIL ADOPT THE ORDINANCE AS PRESENTED. ROLL CALL:
ALL AYES. CARRIED.
Park Department An ordinance was read providing for appropriation and transfer of
Fund Transfer funds in the amount of $19,616.24 from Unanticipated Revenue ($5,000
Rotary Club donation) and Community Facilities Fund ($14,616.24) unto
Park Fund/Facilities for improvement of Renton High School 's west
field. MOVED BY STREDICKE, SECONDED BY ROCKHILL, COULCIL SUSPEND
THE RULES AND ADVANCE THIS ORDINANCE TO SECOND AND FINAL READING.
CARRIED.
a - t
WAYS AND MEANS COMMITTEE
COMMITTEE REPORT
DECEMBER 27, 1982
ORDINANCES
The Ways and Means Committee recommends the following ordinances for first
reading and further recommends suspension of the rules advancing them to
second and final reading:
Alterra Corp. Rezone (R-129-80)
Transfer of Funds - Renton High School Field Improvement
The Ways and Means Committee recommends the following ordinances for second
and final reading:
Cooks Street Vacation (VAC 05-82)
Halsen Street Vacation (VAC 08-82)
REAPPOINTMENTS
The Ways and Means Committee recommends concurrence in the Mayor' s reappointments
of the following persons to the Municipal Arts Commission for three-year terms
effective to December 31 , 1986: Gerald Edlund , Ronald Ringwood, and Connie
Tajon.
APPROVAL OF VOUCHERS
The Ways and Means Committee recommends approval of Vouchers No. 43232 through
No. 43423 in the amount of $726,499.35.
Mr-(7-6-01 c
Richard Stredicke, Chairman
?C4 (/'{-2-
RoberHughes
(/ I:)) /
Randy Rod
HAGGARD, TOUSLEY & BRAIN
ATTORNEYS AND COUNSELORS AT LAW
RUSSELL F.TOUSLEY 1700 DAON BUILDING
JOEL E.HAGGARD 720 OLIVE WAY
CHRISTOPHER I.BRAIN
SEATTLE,WASHINGTON 98101 TELECOPIER
WILLIAM N. SNELL (2O6)624-5299 (206)624-8959
WILLIAM H. BLOCK
MICHAEL G. FULBRIGHT
KIM D.STEPHENS December 27, 1982 OUR FILE NO:
N-15004
Mr . Dave Clemens
Director, Policy Deveoplment
City Hall - Renton
Renton, Washington
Dear Dave:
Enclosed, is the executed original Agreement per
our discussions. This is tendered to the City in ac-
cordance with its. terms and is subject to City adoption of
the zoning and execution by the City. Please send us a
copy of the recorded instrument . No signature has been
secured from the Chicago, Milwaukee, St . Paul and Pacific
Railroad Company as it has been paid off and the Contract
Fulfillment Deeds are being prepared for recording . (See
December 22, 1982 letter from Mr . R.D. Argue to Mr . Del
Bonds - Enclosed) .
We have also obtained for our mutual information
an updated preliminary title report as of December 21,
1982 (See Enclosure) . There are some differences in
format with the earlier one from Pioneer . For example,
Restrictions 15 and 16 in Chicago Title amplify its Re-
striction 21 to call attention to the terms of the ease-
ment . The only substantive difference is that John R.
Hansen, Inc. is now vested in title to Parcel C. This
eliminates Restriction No. 8 in the Pioneer report . A
copy of Instrument No. 8110210021 is enclosed for your
information. We accordingly amended paragraph 3 ( i) in
Exhibit 9 to reflect the Quitclaim deed which follows
Instrument No . 8002220257 .
Sincerely yours,
HAGGARD, USLEY & BRAIN
Jo agg rd
JEH/ab
0212C
Enclosures
cc: Mr . Del Bonds
OF R4,
I, 0 THE .CITY OF RENTON
U t$ ® Z
POLICY DEVELOPMENT DEPARTMENT • 235-2552
z „{� o
0 mom °' MUNICIPAL BUILDING 200 MILL AVE.SO< RENTON,WASH. 98055
,0 0o•
0,9�T�D
BARBARA Y. SHINPOCH MEMORANDUM
MAYOR
•
December 27, 1982
•
TO: Maxine Motor
City Clerk
FROM: David R. Clemens
Policy Development Director •
RE: ALTERRA 'REZONE, R-129-80
Transmitted herewith is the Alterra rezone file, R-129-80, which
includes a legal description of the property in question and the
original of the agreement between the applicants and the City.
The 1 egal description has been reviewed by the Public Works
Department. Changes requested by Richard Houghton, Public Works
Director were made, and the document is now considered accurate.
The Agreement has been reviewed by the City Attorney as to form.
DRC:wr
0008d
THE '
MILWAUKEE Chicago, Milwaukee, St. Paul
ROAD and Pacific Railroad Company
82dSkinner Building
1326 Fifth Avenue (a ( S
Seattle,Washington 98101 Q */(e
Phone: 206 628-3912
,ry
December 22, 1982
Mr. .Delton J. Bonds
•
Alterra Corporation
15004 Ambaum Blvd. Southwest
Seattle, Wasington 98166
FILE: S - Wash. - Renton
• John R: Hansen; Inc: (Sale •NO. 2)
S .- •Wash. —.Renton
• John R: •Hansen Inc: • (Sale 'NO. 3)
•
Dear Mr. Bonds:
This is to advise that John R. Hansen, Inc. has paid in full all money
due under .Real Estate Contract dated August 29, 1980 on the' sale of
approximately 21.26 acres' of land .at .Renton, and all money due on
Real Estate Contract dated August 19, 1980 covering sale of approximately
3.90' acres' of land at Renton.
I am arranging for preparation of appropriate Contract Fulfillment Deeds
from.the' Trustee of the Milwaukee to John R. Hansen, Inc. , purchaser,
in accordance'with each of the' contracts. Recording of such deeds will
then' show title in the' name Of John R. Hansen, Inc. •
Very my your
i
if
R. D. ARGUE
Regional Manager
RDA:rw:3-15
cnic'- : TITLE INSURANCE COMPANY .. ;
1100 Olive Way.
Seattle, Washington 98101
Unit 1
Title Officer, Gary Bean ° 1/1/1
Telephone: 628-5676
A.L.T.A. COMMITMENT
SCHEDULE A
THIRD REPORT
Your No:
Effective Date: December 21 , 1982 at 8 :00 a.m.
Our No: 58116
Alterra Corporation
15004 Ambaum Blvd. S .W.
Seattle, Washington
Attention: Del Bonds
1 . Policy or Policies to be issued: PREMIUM
A. ALTA Residential Policy Form Amount $ $
Proposed Insured: Tax
B. ALTA Owner 's Policy Form B ' 1970 Amount $ 5 ,000 ,000.00 $6 ,411 .25
(Amended 10-17-70) SHORT TERM RATE Tax 416.73
Standard (X) Extended ( )
Proposed Insured:
TO BE DISCLOSED.
C . ALTA Loan Policy - 1970 Amount $ _ $
(Amended 10-17-70) , Tax
Standard ( ) Extended ( ) -
Proposed Insured:
D. Amount $ $
Tax
TOTAL PREMIUM $6 ,827.98
2. The estate or interest in the land described herein and which is
covered by this commitment is: A Fee
3. The estate or interest referred to herein is at, Date of Commitment
vested in:
RICHARD B. OGILVIE, as Trustee of the property of CHICAGO, MILWAUKEE,
ST. PAUL AND PACIFIC RAILROAD COMPANY, A Wisconsin Corporation, under
authority of the United States District Court for the Northern
District of Illinois, Eastern Division Docket No. 77 B 8999 in
Proceedings under Section 77 of the Bankruptcy Act, as to Parcels A
and B; and JOHN R. HANSEN, INC. , a Washington Corporation, as to
Parcel C.
4 . The land referred to in this commitment is situated in the County
of King, State of Washington, and is described on Schedule A, pages 2
through 7 , attached.
CHICAGO TITLE INSURANCE cUMYANX
• k.L.T.A. COMMITMENT 58116
SCHEDULE A
Page 2
4 . THE LAND REFERRED TO IN THIS COMMITMENT IS SITUATED IN THE
COUNTY OF KING, STATE OF WASHINGTON, AND IS DESCRIBED AS
FOLLOWS:
PARCEL A:
That portion of the southwest quarter of Section 13,
Township 23 North, Range 4 East, W.M. , in King County,
Washington;
•
AND
That portion of Junction Addition to the City of Seattle,
according to the plat thereof recorded in Volume 12 of
Plats, page 75, in King County, Washington, TOGETHER WITH
vacated streets adjoining which would attach to said
premises by operation of law;
AND
of C. E. Brownell' s Donation Claim No. 41 AND of that
portion of Tract 26 , Renton Shore Lands 2nd Supplemental ,
described as follows:
Beginning at the south quarter corner of said Section 13;
thence north 00°58 '28" east along the north-south center-
line of said Section 13 a distance of 884.84 feet to the
southeast corner of Tract 26 of Renton Shorelands Second
Supplemental Maps, 1958 ;
thence south 72°37 ' 52" west along the south boundary of said
Tract 26 a distance of 382 .60 feet;
thence north 70°5.4' 02" west along said south boundary of
Tract 26 a distance of 73 .50 feet to the east line of the
Charles Brownell Donation Land Claim No. 41 and the true
point of beginning;
thence continuing north 70°54' 02u west along said south
boundary of Tract 26 a distance of 281 .02 feet;
thence south 73° 56' 01 " west along said south boundary of
Tract 26 a distance of 130 .08 feet;
thence south 41'° 16 ' 07" west along said south boundary of
Tract 26 a distance of 316 . 18 feet to the north boundary of
a tract of land deeded to King County and described under
King County Recording Number 6607786;
thence westerly along said north boundary on a curve to the
left, the center of which bears south 39°41 ' 39" west having
a radius of 627.46 feet an arc distance of 434.70 feet
through a central angle of 39°41 '39" ;
thence north a distance of 25.00 feet along said north
boundary;
thence west a distance of 280.69 feet along said north
boundary;
(continued)
/ C:tiilAC�U T11Lr; I UNAM.Cs l.UP1rALVI
• A.L.T.A. COMMITMENT 58116
' SCHEDULE A
Page 3
thence south 59°53' 47" west along said north boundary a
distance of 377 .52 feet;
thence south 74° 13' 19" west along said north boundary a
distance of 443.31 feet to the northerly margin of the
Charles Monster County Road;
thence north 34° 18'31" west along said northerly margin a
distance of 43 .46 feet to the south line of the Burlington
Northern Railroad right-of-way;
thence along a' curve to the left, along said south line, the
center of which bears north 06°34 '41" west having a radius
of 696 .00 feet, an arc distance of 45 .43 feet through a
central angle of 03°44 '25" to a point of compound curve;
thence along a; curve to the left , along said south line, the
center of which bears north 10° 19'06" west having a radius
of 1 ,055 .00 feet, an arc distance of 209 .95 feet through a
central angle of 11 °24' 08" to a point of compound curve;
thence along al curve to the left , along said south line, the
center of which bears north 21 °43' 14" west having a radius
of 727 .00 feet', an arc distance of 214 .77 feet through a
central angle of 16°55 ' 35" to a point of compound curve;
thence along & curve to the left, along said south line, the
center of which bears north 38°38 '49" west having a radius
of 1 ,571 .00 feet , an arc distance of 206 .57 feet through a
central angle of 07°32' 02" to a point of tangency;
thence north 43°49 '09" east along said south line a distance
of 97. 17 feet to a line 35 feet southerly of and parallel
with the centerline of the existing most southerly track of
the Chicago, Milwaukee, St. Paul and Pacific Railroad
Tracks; '
thence along said parallel line on a curve to the right, the
center of which bears south 42°43 ' 18" east having a radius
of 696.89 feet, an arc distance of 40.09 feet through a
central angle of 03°17 '45" ;
thence north 50°34' 27" east along said parallel line a
distance of 248 .50 feet;
thence along said parallel line on a curve to the right , the
center of which bears south 39°25 '33" east having a radius
of 676.58 feet;, an arc distance of 93.64 feet through a
central angle of 07°55 '47" to a point of reverse curve;
thence along said parallel line on a curve to the left , the
center of which bears north 31 °29 '46" west having a radius
of 428.64 feet, an arc distance-of 73.32 feet through a
central angle of 09°48 '04" to a point of reverse curve;
thence along said parallel line on a curve to the right , the
center of which bears south 41 °17 ' 50" east having a radius
of 2 ,580.74 feet, an arc distance of 437 .40 feet through a
central angle of 09°42'39" to a point of compound curve;
thence along said parallel line on a curve to the right ,
the center of which bears south 31 °35 ' 11 " east having a
radius of 2,790. 19 feet, an arc distance of 789.44 feet
through a central angle of 16° 12 ' 39" to the east line of the
Charles Brownell Donation Land Claim No. 41 ;
thence south 0'1 °24 '04" west along said east line a distance
of 950.58 feet' to the true point of beginning.
(continued)
/ CHICAG O TITLE INEUHANuE cuMYHNx
• lk.L.T.A. COMMITMENT 58116
SCHEDULE A
Page 4
PARCEL B:
That portion of C. E. Brownell' s Donation Claim No'. 41 , and
of the southwest quarter and the southeast quarter of
Section 13, Township 23 North, Range 4 East , W.M. , in King
County, Washington, described as follows:
Beginning at the south quarter corner of said Section 13;
thence north 00°58 '28" east along the north-south centerline
of said Section 13 a distance of 884.84 feet to the
southeast corner of Tract 26 of Renton Shorelands Second
Supplemental Maps, 1958;
thence south 72°37 ' 52" west along the south boundary of said
Tract 26 a distance of 382 .60 feet;
thence north 70°54' 02" west along said south boundary of
Tract 26 a distance of 73 .50 feet to the east line of the
Charles Brownell Donation Land Claim No. 41 ;
thence north 01 °24 ' 04" east along said east line of the
Charles Brownell Donation Land Claim No. 41 a distance of
950 .58 feet to , a line 35 feet southerly of and parallel with
the centerline 'of the existing most southerly track of the
Chicago, Milwaukee, St. Paul and Pacific Railroad Tracks and
the true pointiof beginning;
thence westerly along said parallel line on a curve to the
left, the center of which bears south 15°22' 32" east having
a radius of 2790. 19 feet, an arc distance of 789.44 feet
through a central angle of 16° 12 '39" to a point of compound
curve;
thence continuing along said parallel line on a curve to the
left , the center of which bears south 31 °35 ' 11 " east having
a radius of 2580.74 feet , an arc distance of 437.40 feet
through a central angle of 09°42 ' 39" to a point of reverse
curve;
thence continuing along said parallel line on a curve to the
right, the center of which bears north 41 ° 17 ' 50" west having
a radius of 428 .64 feet, an arc distance of •73.32 feet
through a central angle of 09°48 ' 04" to a point of reverse
curve;
thence continuing along said parallel line on a curve to the
left, the center of which bears south 31 °29 '46" east having
a radius of 676 .58 feet , an arc distance of 93.64 feet
through a central angle of 07°55 '47" to a point of tangency;
thence continuing along said parallel line south 50°34 ' 27"
west a distance of 248 .50 feet to a point of curve;
thence continuing along said parallel line on a curve to the
left, the center of which bears south 39°25 ' 33" east having
a radius of 696.89 feet, an arc distance of 40.09 feet
through a central angle of 03° 17 '45" to the south line of
the Burlington Northern Railroad right-of-way;
(continued)
! / CHICAGO TITLE INSURANCE COMPANY
k.L.T.A. COMMITMENT 58116
SCHEDULE A
Page 5
thence north 43°49 ' 09" east along said south line a distance
of 173.83 feet to a point of curve;
thence continuing along said south line on a curve to the
right, the center of which bears south 46°10 '51" east having
a radius of 4030.00 feet, an arc distance of 197.57 feet
through a central angle of 02°48 ' 32" to a point of compound
curve;
thence continuing along said south line on a curve to the
right, the center of which bears south 43°22' 19" east having
a radius of 1853.00 feet, an arc distance of 194.75 feet
through a central angle of 06°01 ' 18" to a point of compound
curve;
thence continuing along said south line on a curve to the
right, the center of which bears south 37°21 ' 01 " east having
a radius of 10543.00 feet, an arc distance of 186.51 feet
through a central angle of 01 °00 '49" to a point of compound
curve;
thence continuing along said south line on a curve to the
right, the center of which bears south 36°20 ' 12" east having
a radius of 1657.00 feet an arc distance of 193. 93 feet
through a central angle of 06°42 '20" to a point of compound
curve;
thence continuing along said south line on a curve to the
right, the center of which bears south 29°37 ' 52" east having
a radius of 6738.00 feet, an arc distance of 197.76 feet
through a central angle of 01 °40 ' 54" to a point of compound
curve;
thence continuing along said south line on a curve to the
right, the center of which bears south 27°56 ' 58" east having
a radius of 1768.00 feet, an arc distance of 194.45 feet
through a central angle of 06° 18 ' 06" to a point of compound
curve;
thence continuing along said south line on a curve to the
right, the center of which bears south 21 °38 ' 52" east having
a radius of 8603.00 feet, an arc distance of 204.54 feet
through a central angle of 01 °21 '44" to a point of compound
curve;
thence continuing along said south line on a curve to the
right, the center of which bears south 20°17 ' 08" east
having a radius of 1922. 10 feet , an arc distance of 178.79
feet through a central angle of 05° 19 ' 46" to a point of
compound curve on the east line-of said Charles Brownell
Donation Land Claim No. 41 ;
thence continuing along said south line on a curve to the
right , the center of which bears south 14°57 '22" east having
a radius of 2814 . 93 feet , an arc distance of 659.42 feet
through a central angle of 13°25 ' 19" to a point of compound
curve;
thence continuing along said south line on a curve to the
right, the center of which bears south 01 °32'03" east having
a radius of 1165.09 feet, an arc distance of 1097.05 feet
through a central angle of 53°57 '00" to a point of
tangency;
thence continuing along said south line south 37°35' 03" east
a distance of 308 .70 feet to a point of curve;
(continued)
I// . V111%.AVV 111LY la.✓va.aaa.v✓ vv..r....+ _
r �.L.T.A. COMMITMENT 58116
• 1, SCHEDULE A
Page 6 ....
thence continuing along said south line on a curve to the
left, the center of which bears north 52°24' 57" east having
a radius of 1005.37 feet, an arc distance of 45.82" feet
through a central angle of 02°36 '41" to a line 35 feet
southerly of and parallel with the centerline of the
existing most southerly track of the Chicago, Milwaukee, St .
Paul and Pacific Railroad Tracks;
thence westerly along said parallel line north 40° 11 '44"
west a distance of 126.24 feet to a point of curve;
thence continuing along said parallel line on a curve to the
left, the center of which bears south 49°48 ' 16" west having
a radius of 1829 .78 feet, an arc distance of 309 .67 feet
through a central angle of 09°41 ' 48" ;
thence north 49°53' 32" west along said parallel line a
distance of 167.07 feet to a point of curve;
thence continuing along said parallel line on a curve to the
left, the center of which bears south 40°06' 28" west having
a radius of 1102.46 feet , an arc distance of 807 .11 feet
through a central angle of 41 ° 56'46" to a point of compound
curve;
thence continuing along said parallel line on a curve to the
left, the center of which bears south 01 °50 ' 18" east having
a radius of 2790 . 19 feet, an arc distance of 659.24 feet
through a central angle of 13°32 ' 14" to the true point of
beginning.
PARCEL C:
That portion of Tract 25, Renton Shorelands 2nd
Supplemental;
AND
That portion of the southeast quarter of Section 13, AND the
southwest q u at 1--�e-cti9- , �- u ar t e r
of Sectio (v 1 in Township 23 North, Range 4 East , W.M. ,
in King Cou . . 'nrt+ .,., .aos„Y;4,.a_ se,-Eo-1- .
Beginning at the south quarter corner of said Section 13;
thence north 00°58 '28" east along the north-south centerline
of said Section 13, a distance of 884. 84 feet to the
southeast corner of Tract 26 of- Renton Shorelands Second
Supplemental Maps, 1958 , and the true point of beginning;
thence south 72°37 ' 52" west along the south boundary of said
Tract 26, a distance of 382.60 feet;
thence north 70°54 '02" west along the south boundary of said
Tract 26, a distance of 73. 51 feet to the east line of the
Charles Brownell Donation Land Claim No. 41 ;
thence north 01 °24' 04" east along said east line, a distance
of 950 .58 feet to a line 35 feet southerly of and parallel
with the centerline of the existing most southerly track of
the Chicago, Milwaukee, St. Paul and Pacific Railroad
Tracks;
(continued)
1$-l2-ZI
14Ri )' l'Pykr
0119g
moult *-5
CHICAv1) TITLE 1N5U1Q NG1•; cuPWANx
• ! ,k.L.T.A. COMMITMENT 58116
SCHEDULE A
Page 7
thence along said line 35 feet southerly of and parallel
with the centerline of the most southerly track, along a
curve to the right, the center of which bears south
15°22 '32" east , having a radius of 2 ,790 .19 feet, an arc
distance of 659 .24 feet through a central angle of 13°32' 14"
to a point of compound curve;
thence along a curve to the right, along said parallel line,
the center of which bears south 01 °50 ' 18" east having a
radius of 1 , 102.46 feet, an arc distance of 807. 11 feet
through a central angle of 41 °56 '46" ; '
thence south 49°53' 32H east, along said parallel line, a
distance of 167 .07 feet;
thence along a curve to the right, along said parallel line,
having a radius of 1 ,829 .78 feet, an arc distance of 309 .67
feet through a central angle of 09°41 ' 48" ;
thence leaving said parallel line, south 40°11 ' 44" east, a
distance of 126.24 feet to a point on the south line of the
Burlington Northern Railroad right-of-way;
thence along a curve to the left, along said south line, the
center of which bears north 49°48 ' 16" east having a radius
of 1 ,005. 37 feet, an arc distance of 549.02 feet through a
central angle of 31 ° 17 ' 19" to a point of tangent on said
south line of the Burlington Northern Railroad right-of-way;
thence continuing along said south line, south 71 °29 ' 03"
east along a line 50 feet south of and parallel with the
existing southbound track, a distance of 826 .56 feet to the
west line of said Section 18;
thence continuing along said south line south 71 °29 '03"
east, a distance of 85.52 feet to the north line of the
south 650 feet of the southwest quarter of the southwest
quarter of said Section 18;
thence north 89° 10 '25" west along the north line of said
southwest quarter of the southwest quarter of Section 18, a
distance of 81 . 57 feet to the east line of the southeast
quarter of said Section 13;
thence north 88° 15' 00" west along the north line of the
south 650 feet of the southeast quarter of said Section 13 ,
a distance of 2,261 .41 feet to an angle point on the south
boundary of Tract 25 of Renton Shore Lands, 1958;
thence north 33°07 '25" west along said south boundary, a
distance of 154 .51 feet to an angle point;
thence north 27°21 ' 32" east along said south boundary, a
distance of 387 .32 feet to an angle point;
thence north 83° 17 '25" west along said south boundary, a
distance of 171 . 17 feet;
thence south 46°22' 22" west along said south boundary, a
distance of 324 .66 feet;
thence south 72°37 ' 52" west along said south boundary, a
distance of 76 .33 feet to the true point of beginning.
r ' Ln1Lc�uU TIILL inoummnLE kAmirLtr41
/1 • A.L.T.A. COMMITMENT 58116
SCHEDULE B
STANDARD COVERAGE
Schedule B of the policy or policies to be issued will contain
exceptions to the following matters unless the same are disposed
of to the satisfaction of the Company.
1. Defects, liens, encumbrances , adverse claims or other mat-
ters, if any, created, first appearing in the public records
or attaching subsequent to the effective date hereof but
prior to the date the proposed insured acquires for value of
record the estate or interest or mortgage thereon covered by
this Commitment.
2. Rights or claims of parties in possession not shown by the
public records.
3. Encroachments, overlaps, boundary line disputes, and any
other matters which would be disclosed by an accurate survey
and inspection of the premises.
4. Easements or claims of easements not shown by the public
records .
5 . Any lien, or right to a lien, for services, labor or materi-
al heretofore or hereafter furnished, imposed by law and not
shown by the public records.
6. Liens under the Workman 's Compensation Act not shown by the
public records.
7 . Any service, installation, connection, maintenance or con-
struction charges for sewer, water, electricity or garbage
removal.
8. General taxes riot now payable; matters relating to special
assessment and special levies, if any, preceding the same
becoming a lien.
9 . (a) Reservations or exceptions in patents or in Acts
authorizing the issuance thereof;
(b) water rights , claims or title to water.
10. Requirements: Instruments creating the estate or interest
to be insured must be approved and filed for record.
(continued)
cui(ac-�iU TITLE INSURANCE CUMk'ANX
• ,A.L.T.A. COMMITMENT
SCHEDULE B E 58116
Page 2
11 . AN EASEMENT AFFECTING THE PORTION OF SAID PREMISES AND FOR
THE PURPOSES STATED HEREIN, AND INCIDENTAL PURPOSES:
FOR: Construction and
maintenance of a wing wall
IN FAVOR OF: King County, a municipal
corporation
DISCLOSED BY INSTRUMENT
RECORDED: March 5, 1970
RECORDING NUMBER: 6626569
AFFECTS:
A strip of land in Tract 23 of Junction Addition to Seattle
and in the 30 feet wide platted road northwesterly of said
Tract 23, 20 feet in width, begin 15 feet easterly, and 5
feet westerly from the following described line: Beginning
at the southwest corner of Section 13, Township 23 North,
Range 4 East , W.M. , in King County, Washington; thence south
87°26 '48" east 990.77 feet on and along the south line of
said Section 13; thence north crossing the Monster Road, to
a point identified by Washington State Lambert Grid
Coordinates (North Zone) as North 176 ,811 .00 East
1 , 651 , 145.00, which is the true point of beginning; thence
north 40° west 200 .00 feet to a point which is described by
Washington State Lambert Grid Coordinates (North Zone) as
North 176 ,964 .21 , East 1 ,651 ,016 .44.
Said instrument contains the folloiwng, recital:
The grantor reserved unto itself, its successors, assigns ,
tenants and licensees , the right to maintain, renew,
modernize and develop the existing railroad signal and
communication lines which cross the above-described parcel.
If the construction of a wing wall upon the above-described
property by the grantee shall necessitate any change or
relocation of the grantor's said signal and communication
lines, the grantee agrees to pay the cost of such change or
relocation. The grantor also reserves unto itself, its
successors, assigns , tenants and licensees , the right to
construct , operate and maintain railroad tracks across and
upon said real estate, and to operate trains thereover.
12. Storm sewer drainage ( 10 foot wide) easement granted to the
City of Renton 'on 'November 14, 1962 under Application No.
27583 as delineated on the Second Supplemental Maps of
Renton Shore Lands.
AFFECTS: Southerly portion of Parcel
A; southerly, westerly and
easterly portion of Parcel
C and other lands
(continued)
I// CHICs''!) TITLE INSURANCE COMPANY _
L.T.A. COMMITMENT
( ` SCHEDULE B 58116
Page 3
13. AN EASEMENT AFFECTING THE PORTION OF SAID PREMISES AND FOR
THE PURPOSES STATED HEREIN, AND INCIDENTAL PURPOSES:
FOR: Railroad purposes
DISCLOSED BY INSTRUMENT
RECORDED: February 22, 1980
RECORDING NUMBER: 8002220257
AFFECTS: Portion of the northerly 65
feet of said Parcel C
14. AN EASEMENT AFFECTING THE PORTION OF SAID PREMISES AND FOR
THE PURPOSES STATED HEREIN, AND INCIDENTAL PURPOSES:
FOR: Pipeline or pipelines, for
the transportation of oil
and gas
IN FAVOR OF: Olympic Pipe Line Company,
A Delaware Corporation
DISCLOSED BY INSTRUMENT
RECORDED: August 20, 1981
RECORDING NUMBER: 8108200425
AFFECTS:
The westerly 30 feet of Parcel C lying within Government Lot
15 , Section 18 ; Township 23 North, Range 5 East, W.M. , in
King County, Washington.
15. EASEMENT AND THE TERMS AND CONDITIONS THEREOF:
RESERVED BY : Richard B. Ogilvie, not as
as individual but solely as
Trustee of the property of
Chicago, Milwaukee, St.
Paul and Pacific Railroad
Company
PURPOSE: Railroad purposes
AREA AFFECTED:
Portion of Parcel C, described as follows: That portion of
the southwest quarter of Section 13 and the southeast
quarter of Section 13, all in Township 23 North, Range 4
East, W.M. , in 'King County, Washington, described as
follows: Beginning at the south quarter corner of said
Section 13 ; the,nce north 00°58 '28" east along the
north-south centerline of said Section 13 a distance of
1327 .26 feet to the southeast corner of Government Lot 7 of
said Section 131; thence north 87°38 ' 53" west along the south
line of said Government Lot 7 a distance of 429 .05 feet to
the east line of the Charles Brownell Donation Land Claim
No. 41 ; thence north 01 °24 '04" east along said east line a
distance of 332'. 32 feet to a line 100 feet southerly of and
parallel with the centerline of the existing most southerly
track of the Chicago, Milwaukee, St . Paul and Pacific
Railroad tracks', and the true point of beginning; thence
along said line 100 feet southerly of and parallel with the
centerline of the most southerly track, along a curve to the
right, the center of which bears south 15°47 ' 19" east having
a radius of 2 ,725 .19 feet, an arc distance of 663.50 feet
through a central angle of 13°56' 59" to a point of compound
curve; thence along a curve to the right, along said
(continued)
'/ CHIC (7n TITLE INSURANCE COMPANY
• r ,.L.T.A. COMMITMENT
SCHEDULE B 58116
Page 4
parallel line,' the center of which bears south 01 °50' 18"
east having a radius of 1 ,037 .46 feet, an arc distance of
759.52 feet; thence south 49°53' 32" east, along said
parallel line,i' a distance of 167 .07 feet; thence along a
curve to the right, along said parallel line having a radius
of 1 ,764 .78 feet, an arc distance of 298 .67 feet through a
central angle of 09°41 ' 48" ; thence leaving said parallel
line, south 54735 '37" east a distance of 388 .43 feet to a
point on the south line of the Burlington Northern Railroad
Right of Way; thence northwesterly along said south line
along a curve to the right, the center of which bears north
35°24 '23" east having a radius of 1 ,005 .37 feet, an arc
distance of 252.64 feet through a central angle of
14°23'53" ; thence leaving said south line, north 40° 11 '44"
west a distance of 126 .24 feet to a point on a line 35 feet
southerly of and parallel with the centerline of the
existing most southerly track of the Chicago, Milwaukee, St .
Paul and Pacific Railroad tracks; thence along said line 35
feet southerly of and parallel with the centerline of the
most southerly track, along a curve to the left having a
radius of 1 , 829.78 feet, an arc distance of 309.67 feet
through a central angle of 09°41 '48" ; thence north 49°53'32"
west, along said parallel line, a distance of 167.07 feet;
thence along a ; curve to the left, along said parallel line ,
having a radius of 1 , 102.46 feet, an arc distasnce of 807 . 11
feet through a ,central angle of 41 °56 '46" to a point of
compound curve; thence along a curve to the left, along said
parallel line, ihaving a radius of 2 ,790 .19 feet , an arc
distance of 659.24 feet through a central angle of 13°32' 14"
to the east line of the Charles Brownell Donation Land Claim
No. 41 ; thence south 01 °24' 04" west along said east line a
distance of 67 .97 feet to the true point of beginning.
DATED: February 12, 1980
RECORDED: October 21 , 1981
RECORDING NUMBER: 8110210021
16. EASEMENT AND THE TERMS AND CONDITIONS THEREOF:
RESERVED BY: I Richard B. Ogilvie, not as
an individual but solely as
Trustee of the property of
Chicago, Milwaukee, St.
Paul and Pacific Railroad
Company
PURPOSE: Use, maintenance and
renewal with right of
access to a communication
line
AREA AFFECTED: As it now exists across
Parcel C
DATED: February 12, 1980
RECORDED ' October 21 , 1981
RECORDING NUMBER: 8110210021
(continued)
ct11LAt;U TITLE 1NSUI ANLN cUMYANY
• .L.T.A. COMMITMENT
SCHEDULE B 58116
Page 5
If , at some future date, Grantee, his successors or assigns,
desired to relocate said communication line, he will do so
at his expense, and if said communication line is relocated
on real estate' described on Exhibit A, instead of on
adjoining railroad right of way, then Grantee, his
successors or assigns, will grant a permanent 10 foot wide
easement for the new location.
17. Easement for a; drainage ditch granted to King County
Drainage District No. 1 on August 11 , 1960 under Application
No. 25422 as delineated on the Second Supplemental Maps of
Renton Shore Lands.
AFFECTS: Portions of Tracts 25 and
26 of Renton Shore Lands
2nd Supplemental, as
described in Parcels A and
1 C.
18. RESTRICTIONS , EASEMENTS AND LIABILITIES TO MAINTENANCE FEES
AS CONTAINED IN INSTRUMENTS
RECORDED: February 22, 1980 and April
24 , 1980
RECORDING NUMBERS: 8002220257 and 8004240435
AS FOLLOWS:
Seller will retain an assignable easement for a strip of
right-of-way containing 3 .06 acres within subject real
estate to be used for railroad purposes as described on
Exhibit B attached hereto and made a part hereof. Purchaser
may construct one or more industry tracks across said
easement to serve adjoining land. If seller or its assigns
gives notice in writing of its intention to use said
easement assigns will pay the then fair market value for the
land describedlin said Exhibit B. This right for purchase
of an easement will expire if not exercised within two years
from the date of this contract. Prior to fulfillment of
this contract seller will grant to purchaser a permanent ,
non-exclusive roadway easement with a maximum width of 60
feet at a mutually agreeable location for ingress and egress
from subject real estate to Monster Road.
Upon fulfillment of this contract seller will reserve a
60-foot wide, permanent, non-exclusive easement at a
mutually agreeable location, over and across subject real
estate to provide ingress and egress from seller' s remaining
property to the west of subject real estate to the nearest
public street lying southerly of subject real estate.
Purchaser herein agrees that when it improves the street to
city standards,' purchaser will dedicate said easement to the
public for street purposes.
(continued)
CHICncn TITLE INSURANCE CURL NY
L.L.T.A. COMMITMENT
SCHEDULE B 58116
Page 6
Purchaser agrees to pay the entire cost of any Industry Spur
Track it may wish to construct from the existing Chicago,
Milwaukee, St . ' Paul and Pacific Railroad Company Track
adjacent to the northerly side of subject real estate.
Purchaser also agrees to enter into the Milwaukee Railroad's
standard form of construction, maintenance and operation
agreement providing for the construction and future
maintenance of such Spur Track at the expense of the
purchaser.
Upon fulfillment of this contract, seller will reserve a 10
foot wide permanent easement for use, maintenance and
renewal, with right of access, of seller' s communication
line as it now exists across subject real estate. If at
some future date, purchaser, his successors or assigns ,
desires to relocate said communication line, he will do so
at his expenseiand if said communication line is relocated
on subject real estate, instead of on adjoining railroad
right-of-way, then purchaser, his successors or assigns ,
will grant a permanent 10 foot wide easement for the new
location.
Purchaser agrees to protect drainage across subject real
estate in a mariner approved by the City of Renton and
acceptable to the seller' s division engineer.
AFFECTS: Parcel C
19. RESTRICTIONS, EASEMENTS AND LIABILITIES TO MAINTENANCE FEES
AS DISCLOSED IN INSTRUMENT
RECORDED: September 30, 1980
RECORDING NUMBER: 8009300609
AS FOLLOWS:
Purchaser agrees to pay the entire cost of any Industry Spur
Tract it may wish to construct from the existing Chicago,
Milwaukee, St . Paul and Pacific Railroad Company Tracks
adjacent to the northerly side of subject real estate.
Purchaser also agrees to enter into the Burlington
Northern's Railroad's or other operating standard form of
construction, maintenance and operation agreement providing
for the construction and future maintenance of such spur
track at the expense of the purchaser.
Upon fulfillment of this contract, seller will reserve a 10
foot wide permanent easement for use, maintenance and
renewal, with right of access, of seller's communication
line as it now exists across subject real estate. If at
some future date, purchaser, his successors or assigns,
desires to relocate said communication line, he will do so
at his expense and if said communication line is relocated
on subject real estate, instead of on adjoining railroad
right-of-way, then purchaser, his successors or assigns,.
will grant a permanent .10 foot wide easement for the new
location.
(continued)
r LU1(.JU.J TITLE 11V5UNAlvl.D L.UL1Z'* Ldi
1.L.T.A. COMMITMENT
. r SCHEDULE B • 58116
Page 7
Purchaser agrees to protect drainage across subject real
• estate in a manner approved by the City of Renton and
acceptable to the seller' s division engineer.
AFFECTS: Parcel A
20. RESTRICTIONS, EASEMENT AND LIABILITIES TO MAINTENANCE FEES
AS CONTAINED IN INSTRUMENT
RECORDED: September 30, 1980
RECORDING NUMBER: 8009300611
AS FOLLOWS:
Purchaser agrees to grant Burlington Northern Inc. , or
seller the right to purchase, for railroad purposes, subject
property for a period of one year from June 23, 1980. In
the event Burlington Northern Inc. , or seller elects to
purchase subject property, purchaser will sell to Burlington
Northern, Inc. , or seller, at the then fair market value,
but not less than your remaining contractual obligation plus
your cash investment, including interest and incidental
expenses. If the Burlington Northern Inc. , or seller does
not purchase subject property in accordance with paragraph 5
above, purchaser may use or remove all, or portions therof,
of the 2 .38 miles of railroad track described above,
provided purchaser enters into a written agreement with
Burlington Northern Inc. to cover use and maintenance of the
tracks located on Burlington Northern Inc. right-of-way, or
else secures written agreement from Burlington Northern Inc.
to enter upon Burlington Northern Inc. right-of-way for the
purpose of removing those tracks from subject property.
Purchaser agrees to pay the entire cost of any Industry Spur
Tract it may wish to construct from the existing tracks on
or adjacent to ;subject real estate.- Purchaser also agrees
to enter into the Burlington Northern's Inc. 's or other
operating railroad' s standard form of construction,
maintenance and operation agreement providing for the
construction and future maintenance of such spur track at
the expense of the purchaser.
Purchaser agrees to protect drainage across subject real
estate in a manner approved by the City of Renton and
acceptable to the seller' s division engineer.
AFFECTS: Parcel B
(continued)
j a \r it J. Z # i11LaJ iaalV aL71\Vu vvaaa aaaa
'�.L.T.A. COMMITMENT
SCHEDULE B = 58116
Page 8
21 . EXCEPTIONS AND RESERVATIONS CONTAINED IN DEED:
• FROM:
Richard B. Ogilvie, not as an individual but solely as
trustee of the property of Chicago, Milwaukee, St. Paul and
Pacific Railroad Company, debtor, being in possession of all
the assets and ',property of said railroad company under
authority of the United States District Court for the
Northern District of Illinois , Eastern Division, Docket No.
77 B 8999 in proceedings under Section 77 of the Bankruptcy
Act and pursuant to Order No. 349 of said court entered June
23, 1980.
RECORDING NUMBERS: 8002220257, 8004240435,
8009300609 , 8009300611
and 8110210021
AS FOLLOWS: The seller shall reserve
mineral rights, but with-
out right of surface entry.
22. Exceptions and Reservations contained in deed from the State
of Washington, ;whereby the Grantor excepts and reserves all
oil, gases, coal, ores , minerals, fossils, etc. , and the
right of entry for opening, developing and working the same
and providing that such rights shall not be exercised until
provision has been made for full payment of all damages sus-
tained by reason of such entry; Recorded under Recording
Number 5780049 :
Right of State of Washington or its successors , subject to
payment of compensation therefore, to acquire rights of way
for private railroads, skid roads, flumes , canals , water
courses or other easements for transporting and moving tim-
ber, stone, minerals and other products from this and other
property, as reserved in deed referred to above.
AFFECTS:
Portion of said Parcels A and C, lying within Tracts 26 and
25, Second Supplemental Maps of Renton Shore Lands.
23. We are unable to determine if the recital "to have and to
hold unto second party so long as used for railroad
purposes" affects that portion of Parcel B, lying within the
original conveyance of the 40 foot railroad right of way
granted by John C. Monster to Columbia and Puget Sound
Railroad Company under deed filed May 18 , 1882 in Volume
22D, page 732, 1File No. B-380.
24. Payment of Real Estate Excise Tax, if required .
The property described herein is situated within the bound-
aries of local taxing authority,of: City of Renton.
Present Rate of Real Estate Excise Tax as of the date herein
is 1 .32%
(continued)
CHICsr'f) TITLE INSURANCE COMPANY
�.L.T.A. COMMITMENT
SCHEDULE B 58116
• Page 9
25. DELINQUENT GENERAL TAXES:
YEAR: 1981 1982
AMOUNT BILLED: ; $2,475.28 $2 ,363.22
AMOUNT PAID: $ 0.00 $ 0.00
AMOUNT DUE: $2,475 .28 $2,363 .22 PLUS INTEREST
TAX ACCOUNT NO: 377920-0116-00
AFFECTS: Parcel A
26. DELINQUENT GENERAL TAXES:
YEAR: 1981 1982
AMOUNT BILLED: ' $496.78 $474.29
AMOUNT PAID: $ 0 .00 $ 0 .00
AMOUNT DUE: $496.78 $474.29 PLUS INTEREST
TAX ACCOUNT NO: 132304-9012-01
AFFECTS: Parcel B
i
27 . DELINQUENT GENERAL TAXES:
YEAR: 1981 1982
AMOUNT BILLED: $3.84 $3.67
AMOUNT PAID: $0.00 $0.00
AMOUNT DUE: ! $3.84 $3 .67 PLUS INTEREST
TAX ACCOUNT NO: 182305-9081-01
AFFECTS:
Portion of Parcel C lying within Section 18, Township 23
North, Range 5 East , W.M. , in King County, Washington,
except coal and mineral rights .
DELINQUENT GENERAL TAXES:
YEAR: 1981 1982
AMOUNT BILLED: $ .96 $ .92
AMOUNT PAID: 1 $.00 $.00
AMOUNT DUE: $ .96 $ .92 PLUS INTEREST
TAX ACCOUNT NO: 182305-9276-06
AFFECTS:
Coal and mineral rights of that portion of Parcel C lying
within Section118 , Township 23 North, Range 5 East, W.M. , in
King County, Washington.
DELINQUENT GENERAL TAXES :
YEAR: 1980 1981 1982
AMOUNT BILLED: $3 ,245 .43 $5 ,065.86 $4 ,836 .53
AMOUNT PAID: $ 0. 00 $ 0.00 $ 0.00
AMOUNT DUE: $3 ,245 .43 $5 ,065.86 $4 ,836 .53
PLUS INTEREST
TAX ACCOUNT NO: 132304-9024-07
AFFECTS:
That portion of Parcel C lying within Section 13, Township
23 North, Range 4 East, W.M. , in King County, Washington,
except coal and mineral rights .
(continued)
CHIC"•r.9 TITLE INSURANCE COMPANY
..L.T.A. COMMITMENT
SCHEDULE B - 58116
Page 10
DELINQUENT GENERAL TAXES :
YEAR: 1980 1981 1982
AMOUNT BILLED: $ 1 .44 $ .96 $ .92
AMOUNT PAID: $ .72 $.00 $.00
AMOUNT DUE: $ .72 $ .96 $ .92
PLUS INTEREST
TAX ACCOUNT NO: 132304-9083-05
AFFECTS:
Coal and mineral rights of that portion of Parcel C lying
within Section 13, Township 23 North, Range 4 East, W.M. , in
King County, Washington.
28. CONTRACT OF SALE AND THE TERMS AND CONDITIONS THEREOF:
SELLER:
Richard B. Ogilvie, not as an individual but solely as
trustee of the property of Chicago, Milwaukee, St. Paul and
Pacific Railroad Company, debtor, being in possession of all
the assets and property of said railroad company under
authority of the United States District Court for the
Northern District of Illinois, Eastern Division, Docket No .
77 B 899 in proceedings under Section 77 of the Bankruptcy
Act and pursuant to Order No. 349 of said court entered June
• 23, 1980 .
PURCHASER: John R. Hansen, Inc. , a
Washington Corporation
DATED: August 29, 1980
RECORDED: September 30, 1980
RECORDING NUMBER: 8009300609
EXCISE TAX RECEIPT NUMBER: E-0609148
AFFECTS: Parcel A
Said contract , among other things, contains the following
stipulation:
The purchaser shall not, without first having the consent in
writing of the seller, assign this contract or any interest
thereunder.
PURCHASER'S INTEREST WAS ASSIGNED AND SAID PREMISES CONVEYED
BY PURCHASER'S ASSIGNMENT OF CONTRACT AND DEED:
DATED: - September 26, 1980
RECORDED: September 30, 1980
RECORDING NUMBER 8009300610
ASSIGNEE: Renton Property Associates
EXCISE TAX RECEIPT NUMBER(S) : E-0609149
SUPPLEMENTAL AGREEMENT OF SAID CONTRACT AND THE TERMS AND
CONDITIONS THEREOF:
DATED: December 22, 1980
RECORDED: December 23, 1980
RECORDING NUMBER: 8012230800
AS FOLLOWS :
(continued)
► CHIC;"^1 TITLE INSURANCE COMPANY
/. .4.L.T.A. COMMITMENT
SCHEDULE B 58116
Page 11
Whereas , under Real Estate Contract dated August 29, 1980 ,
recorded under ',Recording Number 8009300609, records of King
County, Washington, the seller agreed to sell and the
purchaser agreed to purchase approximately 21 .26 acres of
real estate, as described in said contract, and
Whereas, said contract was assigned to grantee by
Purchaser' s Assignment of Contract and Deed, dated September
26, 1980 , recorded under Recording Number 8009300610,
records of King County, Washington, and
Whereas , when said contract was executed, the purchaser and
the seller were unaware of a railroad track across the
extreme west end of the 21 .26 acre parcel as shown on survey
recorded October 8 , 1980 under Recording Number 8010089004,
records of King County, Washington, and
Whereas , it was not the intention of the seller to sell said
railroad track to purchaser, and
Whereas, said track will be sold to Oregon-Washington
Railroad & Navigation Company,
Now therefore, the seller will retain a permanent assignable
easement for the operation and maintenance of a railroad
track without the right to fence or barricade said easement
on a strip of land thirty (30) feet in width, being fifteen
( 15) feet on either side of said railroad track, and upon
fulfillment of said real esate contract, grantee agrees to
accept title to the 21 .26 acre parcel of land subject to
said railroad easement which will run until the track is
permanently removed or if abandoned for a period of one
year.
Except as herein amended, all other provisions of said
contract of August 29 , 1980, remain in full force and
effect.
29. CONTRACT OF SALE AND THE TERMS AND CONDITIONS THEREOF:
SELLER:
Richard B. Ogilvie, not as as individual but solely as
trustee of the property of Chicago, Milwaukee, St. Paul and
Pacific Railroad Company, debtor, being in possession of all
the assets and property of said railroad company under
authority of the United States District Court for the
Northern District of Illinois, Eastern Division, Docket No .
77 B 8999 in Proceedings under Section 77 of the Bankruptcy
Act and pursuant to Order No. 349 of said court entered June
23, 1980
PURCHASER: John R. Hansen, Inc. , a
Washington Corporation
DATED: August 29, 1980
RECORDED: September 30, 1980
RECORDING NUMBER: 8009300611
EXCISE TAX RECEIPT NUMBER: E-0609150
AFFECTS: Parcel B
(continued)
/ 1P1►7U1ItL '..Z l.Vrlrritlx
•
.L.T.A. COMMITMENT
. SCHEDULE B 58116
• `' Page 12
Said contract , among other things , contains the following
recital:
The purchaser shall not, without first having the consent in
writing of the Iseller, assign this contract or any interest
thereunder.
PURCHASER'S INTEREST WAS ASSIGNED AND SAID PREMISES
CONVEYED BY PURCHASER'S ASSIGNMENT OF CONTRACT AND DEED:
DATED: September 26, 1980
RECORDED: I September 30, 1980
RECORDING NUMBER 8009300612
ASSIGNEE: Renton Property Associates
EXCISE TAX RECEIPT NUMBER(S) : E-0609151
30. CONTRACT OF SALE AND THE TERMS AND CONDITIONS THEREOF:
SELLER: John R. Hansen, Inc. , a
Washington Corporation
PURCHASER:
Ronald G. Neubauer, an undivided 33-1/3% interest; Delton J.
Bonds, an undivided 33-1/3% interest; Kenneth L. Thompson
and Merton Cohen, an undivided 33-1/3% interest , all doing
business as Jag-Renton Associates, a general partnership
DATED: April 22, 1980
RECORDED: April 24, 1980
RECORDING NUMBER: 8004240435
EXCISE TAX RECEIPT NUMBER: E-0589018
AFFECTS: Parcel C
The purchaser's interest is presumptively subject to the
community interest of their respective spouses if married on
or since April 22, 1980 date of said contract.
31 . JUDGMENT
AGAINST: Merton L. Cohen and Carol
Sue Cohen, husband and
wife, individually and
against their marital
community
IN FAVOR OF: 1 Henry Bacon Building
- Materials, Inc, a
Washington corporation
FOR: $10 ,546 .32 plus additional
attorney' s fees in amount
$100 .00. Said judgment
shall bear interest from
June 1 , 1982 until paid at
rate of 1-1/2% per month.
ENTERED: October 5, 1982
KING COUNTY JUDGMENT NO: 82-9-14555-1
SUPERIOR COURT' CAUSE NO: 82-2-02948-3
ATTORNEY FOR JUDGMENT
CREDITOR: Robert J. Frederick
(continued)
, CHIC'•'''1 TITLE INSURANCE COMPANY
�.L.T.A. COMMITMENT
SCHEDULE B 58116
Page 13
32. Matters disclosed by survey recorded under Recording Number
8010089004 , copy attached.
AFFECTS: Parcel A
33. Matters disclosed by survey recorded under Recording Number
8010089005, copy attached.
AFFECTS: Parcel B
34. Matters disclosed by survey recorded under Recording Number
8001309003, copy attached.
AFFECTS: Parcel C
The description in said survey was corrected by instrument
recorded February 28, 1980 under Recording Number
8002280821 .
35. PENDING BANKRUPTCY PROCEEDINGS:
U.S . DISTRICT COURT:
CASE NUMBER: 77B-8999
BANKRUPT: Chicago Milwaukee, St. Paul
and Pacific Railway Company
FILED: Not disclosed at this time
TRUSTEE: Richard B. Ogilvie
ATTORNEY FOR BANKRUPT: Not disclosed at this time
ANY SALE, MORTGAGE OR PURCHASE MUST BE, PURSUANT TO COURT
ORDER.
36. Terms and conditions of the partnership agreement for Renton
Property Associates, a Washington Partnership.
NOTE: A copy of the partnership agreement must be
submitted. -
37. Any conveyance or mortgage by Renton Property Associates , a
Washington partnership, must be executed by all of the
general partners and their respective spouses as of the date
of acquisition or evidence submitted that certain designated
partners have been authorized to act for the partnership.
38. Matters of record, if any, against the names of the undis-
closed general partners of Renton Property Associates, a
Washington partnership.
39. Terms and conditions of the partnership agreement for
Jag-Renton Associates, a General Partnership. •
NOTE: A copy of the partnership agreement must be •
submitted.
40. Any conveyance or mortgage by Jag-Renton Associates, a
general partnership, must be executed by all of the general
partners and their respective spouses as of the date of
acquisition or evidence submitted that certain designated
partners have been authorized to act for the partnership.
(continued)
l:ri1l:P`='I� TITLE 1NSUKANLG LUMYALVY
.L.T.A. COMMITMENT
SCHEDULE B 58116
• Page 14
A
41 . Matters of record, if any, against the names of the
undisclosed general partners of Jag-Renton Associates, a
general
partnership.
42. Matters which may be disclosed by a search of the records
against the name of the spouses of Ronald G. Neubauer,
Delton J. Bonds and Kenneth L. Thompson, if married.
43. Assessments, if any, which will follow by supplemental
report.
END OF SCHEDULE B
•
II
CR/mw
D-2512
HAGGARD, TOUSLEY & BRAIN
ATTORNEYS AND COUNSELORS AT LAW
RUSSELL F.TOUSLEY 1700 DAON BUILDING
JOEL E.HAGGARD 720 OLIVE WAY
CHRISTOPHER I.BRAIN
SEATTLE,WASHINGTON 98101 TELECOPIER
WILLIAM N. SNELL (206)624-5299 (206)624-8959
WILLIAM H. BLOCK
MICHAEL G. FULBRIGHT
KIM D.STEPHENS
OUR FILE NO:
December 17, 1982
N-15004 .A
Mr . David R. Clemens
Policy Development Director CITY OF RENTON
Policy Development Department
City of Renton Municipal Bldg. DEC 201982
200 Mill Avenue South
Renton, Washington 98005 - POLICY
DEVELOPMENT nEPT.
RE: Alterra Rezone Dedication
Dear Mr . Clemens: .
Enclosed are ( i) a final copy of the Agreement
which is presently being circulated for execution and (ii)
a map of the property described on Exhibit 6 (the Central
Preserve Area) of the enclosed Agreement.
We understand that an ordinance rezoning our
client ' s property is currently being prepared . We assume
the ordinance will be consistent with the enclosed
Agreement and the Hearing Examiner ' s report. We would
appreciate your sending us a copy of the ordinance as soon
as it is available.
If you have any questions, please feel free to
call . Thank you for your cooperation.
Very truly yours,
HAGGARD, TOUSLEY & BRAIN
s.
Michael G. Fulbright
MGF/dlb
0108C
Enclosures
cc: Ronald Neubauer , Esq.
Mr . Del Bonds
Renton City Council
December 13, 1982
Page 3
Meeting Council reconvened at 9:30 p.m. All Council Members were present
Reconvened at roll call .
CONSENT AGENDA The following items are adopted by one motion which follows the
items included:
,. Alterra Rezone. Land Use Hearing Examiner recommended approval of rezone, File No.
R-129-80 R-129-80, Alterra Corporation from G-1 (General ) to M-P (Manufacturing
Park) for property located on the north side of S.W. 7th Street, east
of the proposed P-1 Channel , south of old Chicago Milwaukee Railroad,
and west of Thomas Avenue S.W. Also included were letters from the
Hearing Examiner and Policy Development Director requesting Council
deliberation of specific use of greenbelt property. Refer to Ways
and Means Committee.
Revisions to Planning Commission submitted recommendations for zoning issues
Zoning Code concerning Public District (P-1) , proposed Office Park District (OP) ,
and proposed Landscaping Ordinance; and amendment to Office Park
Comprehensive Plan Policy. Refer to Ways and Means Committee for
report and recommendation.
Fire Truck Mayor Shinpoch concurred in Fire Chief Geissler's recommendation to
Purchase purchase 1950 Kenworth 1500 GM fire truck with 400 Hall Scott engine
from Seattle Fire Department. Refer to Public Safety Committee for
review and recommendation.
Tax Anticipation Finance Department requested ordinance authorizing issuance of
Notes Ordinance $2,925,000.00 of tax anticipation notes to provide for short term
cash flow requirements of the city.; repayment of notes at year's
end from property taxes and other revenue sources. Refer to Ways
and Means Committee.
Water and Sewer Finance Department requested amendment to Ordinance No. 3594 to adjust
Rates 1983 water rates effective January 1 , 1983; and Ordinance No. 3595 to
adjust sewer rates effective January 1 , 1983. Refer to Ways and Means
Committee.
Garbage Rates Finance Department requested amendment to Ordinance No. 3630 to
1983 reflect 1983 garbage rate increases effective January 1 , 1983. Refer
to Ways and Means Committee.
Equipment Rental Finance Department requested amendment to Ordinance No. 3596 to reflect
Rates 1983 1983 Equipment Rental rates effective January 1 , 1983. Refer to Ways
and Means Committee.
N.E. 12th Street Design Engineering Department requested acceptance of N.E. 12th Street
Project Improvement Project (CAG 040-82) , approval of final pay estimate, and
CAG-040-82 commencement of 30-day lien period on December 13, 1982. If, after
expiration of the lien period, no liens or claims have been filed
against the project and all taxes paid, the retainage amount of
$14,403.95 shall be paid to the contractor, West Coast Construction. .
Council concur.
Park Ave. N. Public Works Department requested authorization to proceed with Park
Signal Project Avenue N. Signal Interconnect Project, 100% funded through Federal
Aid Urban Systems Funds (FAUS) , from N.' 6th Street 'to FAI-405
northbound on/off ramps (North Renton Interchange) , for replacement
of traffic controllers on Park Avenue, installation of new vehicle
detection system, interconnection to new traffic signal computer,
and development of operational programs for input to computer. Refer
to Ways and Means Committee for resolution.
Consolidation Personnel Department recommended consolidation of Police and Fire
of Fire & Police Civil Service Commissions to gain standardization in administration
Civil Service of rules; proposal has been reviewed and approved by members of both
Commissions existing commissions. Refer to Public Safety Committee for review
and report. .
Claim for Damages' Claim for damages filed by Peggy Rollins in the amount of $52.97 for
Rollins, CL-59-82 alleged unnecessary impoundment of automobile on 12-1-82 near her
residence, 628 Shattuck S. Refer to City Attorney & Insurance Carrier.
Renton City Council
December 13, 1982
Page 4
CONSENT AGENDA continued
Claim for Damages Claim for damages was filed by Marion Russell in the amount of 5374.50
Russell , CL 60-82 for damage to automobile hood and fender by tree which allegedly slipped
from hands of city workman on 11-30-82 on Airport Way. Refer to
City Attorney and Insurance Carrier.
Consent Agenda MOVED BY CLYMER, SECONDED BY ROCKHILL, COUNCIL ADOPT CONSENT AGENDA
Approved AS AMENDED. CARRIED.
The following items were removed from the Consent Agenda for separate
consideration.
Reappointment Mayor Shinpoch reappointed Municipal Court Judges Pro tempore for
of Municipal 1983 as follows: Gary Faull , Peter Banks, Richard Jackson, Deborah
Court Judges Fleck, Robert Anderson, David Tracy and Kameron Kayce. MOVED BY
Pro tempore HUGHES, SECONDED BY CLYMER, COUNCIL CONFIRM APPOINTMENTS. CARRIED.
Renewal of Public Works Department requested renewal of CATV contract for
CATV Contract services, 1983, for 3-H Management and Consultants, Inc. at an
1983 annual increase of $845.25 which includes added activities of
public service programs and monitor of Senate bills affecting
local governmental control of telecommunication regulation.
Moved by Clymer, seconded by Trimm, Council approve CATV contract
without referral to Ways and Means Committee. Councilman Stredicke
indicated the motion should include authorization for the Mayor and
City Clerk to sign the agreement. MOVED BY CLYMER, SECONDED BY
TRIMM, COUNCIL AUTHORIZE MAYOR AND CITY CLERK TO SIGN THE 1983
CATV CONTRACT. CARRIED.
CORRESPONDENCE Letter from Mayor Shinpoch requested Council concurrence in the
Marine Patrol recommendation to secure support and assistance from the Association
Funding of Washington Cities in efforts to draft and implement legislation
providing a long-term funding solution for marine patrol services
for the eight lakeside cities. Expiration of the current contract
with King County will occur after the 1983 boating season, and
levels of service may be expanded only upon imposition of some form
of boat tax or registration fee which State Legislature must authorize.
MOVED BY CLYMER, SECONDED BY HUGHES, COUNCIL CONCUR IN THE REQUEST
AND REFER THE MATTER TO THE WAYS AND MEANS COMMITTEE. Responding to
Councilman Rockhill 's query regarding inclusion of the entire state
or just the eight lakeside cities for potential registration fees,
Administrative Assistant Michael Parness advised that although a
specific proposal has not been formulated, inclusion of study of
either a state-wide or regional approach to marine patrol funding
will be requested in the AWC legislative package. MOTION CARRIED.
Central Area Planning Commission submitted the Central Area Comprehensive Plan
Comprehensive Amendment recommending adoption by the City Council , and noting
Plan Amendment a public hearing, although not required, may be held. The letter
requested consideration of whether or not to hold a public hearing.
or meeting, and whether to send the matter to Planning and Development
Committee for a report or to Ways and Means Committee to prepare an
ordinance. MOVED BY ROCKHILL, SECONDED BY REED, REFER THE CENTRAL
AREA COMPREHENSIVE PLAN AMENDMENT TO THE PLANNING AND DEVELOPMENT
COMMITTEE FOR RECOMMENDATION: MOVED BY STREDICKE, SECONDED BY
CLYMER, AMEND MOTION TO INCLUDE REQUIREMENT OF PUBLIC HEARING ON
JANUARY 24, 1983. CARRIED. Discussion was held regarding possible
violation of Appearance of Fairness Doctrine if the committee
presents a recommendation prior to holding a public hearing. City
Attorney Warren explained matter could be studied in committee prior
to public hearing as long as Council Members did not express
predetermined opinions at the hearing. Further discussion indicated
that the motion as amended does not prevent the Planning and Development
Committee from reporting a recommendation as long as it follows the
public hearing. *ORIGINAL MOTION AS AMENDED CARRIED.
OLD BUSINESS
Utilities Utilities Committee Chairman Mathews presented a report recommending
Committee concurrence in the recommendation of the Public Works Department for
Grady Way approval of the Grady Way Associates Latecomer Agreement for Water
Associates Main improvements, and further recommends that the City Council
Latecomers authorize the Mayor and City Clerk to execute said agreement. MOVED
Agreement BY MATHEWS, -SECONDED BY TRIMM, COUNCIL CONCUR IN THE RECOMMENDATION
OF THE UTILITIES COMMITTEE. CARRIED.
•
For.Use By City Clerk's Office Only
A. I . #
AGENDA ITEM
RENTON CITY COUNCIL MEETING
SUBMITTING
Dept./Div./Bd./Comm. Land Use Hearing Examiner For Agenda Of December 13, 1982
(Meeting Date)
Staff Contact Willis Roberts
(Name) Agenda Status:
SUBJECT: File No. R-129-80; Alterra Consent
Corp.; Request for Rezone Public Hearing
Correspondence
Ordinance/Resolution X
Old Business
Exhibits: (Legal Descr. , Maps, Etc. )Attach New Business
Study Session X
A. Examiner's Report, 7-29-82 Other
B. Correspondence from Policy Development •.. • -
Director Approval :
C. Correspondence from Hearing Examiner
D. Applicant's Letter and Draft Agreement Legal Dept. Yes No N/A X
COUNCIL ACTION RECOMMENDED: Finance Dept. Yes No. N/A X
Referral to Ways and Means Committee Other Clearance
FISCAL IMPACT:
Expenditure Required $ Amount $ Appropriation- $
Budgeted Transfer Required
SUMMARY (Background information, prior action and effect of implementation)
(Attach additional pages if necessary.)
The appeal period for the attached Examiner's Report and Recommendation
expired on August 12, 1982. An agreement was negotiated during the interim
to satisfy conditions of the Recommendation. The matter is hereby forwarded
to the City Council for review and referral to the Ways and Means Committee
for the preparation of an ordinance.
PARTIES OF RECORD/INTERESTED CITIZENS TO BE CONTACTED:
SUBMIT THIS COPY TO CITY CLERK BY NOON ON THURSDAY WITH DOCUMENTATION.
CITY' OF RENTON
uEC 131982
HAGGARD, TOUSLEY & BRAIN POLICY
ATTORNEYS AND COUNSELORS AT LAW DE\IFl.OPMF1 T r FPT.
RUSSELL F.TOUSLEY
JOEL E.HAGGARD
CHRISTOPHER I.BRAIN
1700 DAON BUILDING
720 OLIVE WAY
SEATTLE,WASHINGTON 98101 TELECOPIER
WILLIAM N. SNELL (206)624-5299 (206) 624-8959
WILLIAM H. BLOCK
MICHAEL G. FULBRIGHT
KIM D.STEPHENS
OUR FILE NO:
!// i N-1504.A
December 10 , 1982
Mr . David R. Clemens
Policy Development Director
Policy Development Department
City of Renton Municipal Bldg .
200 Mill Avenue S .
Renton, WA 98005
Re: Alterra Rezone Dedication
Dear Mr . Clemens:
The property commonly known as the Central
Preserve Area was described in Exhibit 6 of the Agreement
(the "Agreement" ) which was forwarded to you by our letter
of November 30 , 1982 . Triad Associates has revised the
legal description of the Central Preserve Area in the
manner you and Joel Haggard have discussed . Accordingly,
a revised Exhibit 6 to Agreement is enclosed for you to
substitute in place of Exhibit 6 of the Agreement
forwarded to yo.0 by our letter of November 30 .
In addition, given the number of parties that
must execute the Agreement, we would like to add a new
Section 7 .3 to the Agreement which provides for its
execution in counterparts . A revised page 4 of the
Agreement which contains our new Section 7 .3 is enclosed
for your review. Please let us know if you have any
problems with our Section 7 .3 . Unless we hear from you to
the contrary, we will assume that you have no objection to
our Section 7 .3 and proceed upon that basis .
•
Very truly yours,
HAGGARD, TOUSLEY & BRAIN
7722,-,ke_
Michael G. Fulbright
MGF/td
9957B
Enclosures
cc: Ron Newbauer , Esq.
Mr . Del Bonds
•
equivalencies of the Greenbelt Property and the Flood
Control Property ',and the flood storage capacity of the
Flood Control Property when developing the Retained
Property. Notwithstanding anything contained herein to
the contrary, the City shall not be obligated to allow the
• construction of more than 995,781 .5 gross square feet upon
the Retained Property.
Section 6 . Joinder . Trustee and Hansen join in
this Agreement for the purpose of subjecting their
interests in the Greenbelt Property and the Flood Control
Property to the terms and conditions contained herein.
Furthermore, as long as Trustee and or Hansen retain an
interest in the Greenbelt Property and or the Flood
Control Property,, they each agree to join in any future
conveyances pursuant to Section 4 hereof . The provisions
of this Section 6 shall be binding upon the successors and
assigns of Trustee and or Hansen.
Section 7 . Miscellaneous .
7 .1 The captions of this Agreement are for
convenience only and shall not be considered or referred
to in resolving questions of interpretation or
construction.
7 .2 Each and all of the provisions of this
Agreement shall be binding upon and inure to the benefit
of each of the parties hereto, and their heirs, successors
and assigns.
7 .3 This Agreement may be executed in any
number of counterparts and all counterparts shall be
deemed to constitute a single agreement. The execution of
one counterpart by any party shall have the same force and
effect as if that party had signed all other counterparts.
IN WITNESS WHEREOF, the undersigned have entered
into this Agreement as of the date hereinabove first
mentioned.
CITY:
CITY OF RENTON,
a Washington municipal corporation
By
By
RPA:
RENTON PROPERTY ASSOCIATES,
a Washington general partnership
By
By
12/01/82
7792B 4
r-,
1 •
EXHIBIT 6 TO
AGREEMENT CIT"+� OF RENTON
U E C 13 1982
POLICY
DEVELOPMFh!T WEPT.
That portion of the south half of Section 13, Township 23 North, Range 4 East, W.M.
in King County, Washington, of Junction Addition to the City of Seattle, according
County,
the plat recorded in Volume 12 of Plats, page 75, records of said King
and of C.E. Brownell 's Donation Claim No. 41 , described as follows:
Beginning at the south quarter corner of said Section 13; thence N00°58'28"E along
the north-south centerline thereof 1092.82 feet; thence 568°03'54"W 351.11 feet to
the TRUE POINT OF BEGINNING; thence N68°03'54"E 575.56 feet; thence N80°04'48"E
232.00 feet; thence S42°06108"E 215.00 feet; thence N49°16'27"E 47.54 feet; thence
N41°23'00"W 158.97 feet to a point of curve; thence on a _curve to the left, having
a radius of 145.00 feet, thru a central angle of 60°38'00", an arc distance of
153.45 feet; thence 577 59 00"W 207.77 feet to a point of curve; thence on a curve
to the right, having a radius of 230.00 feet, thru a central angle of 79°13'15",
an arc distance of 318.01 feet; thence S82°15'00"W 457.99 feet; thence s60°16'00"W
28.17 feet; thence S34°20'00"E51 feet to a 572°04'34"E 43�35 f eet which
tobears
the TRUEOP INT OFr�
the TRUE POINT OF BEGINNING; thence
BEGINNING.
Containing 180,421 square feet or 4. 142 acres more or less.
OF R4
00 O THE CITY OF RENTON
%$ p. z
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH. 98055
•
o ° BARBARA' Y. SHINPOCH, MAYOR • LAND USE HEARING EXAMINER
90 FRED J. KAUFMAN. 235-2593
0 SEPI°4-
December 6, 1982
411
DEC 6. 10* 2
Mr. Joel Haggard
1700 Daon Building
720 Olive Way CITY CLERK
Seattle, WA 98101
RE: File No. R-129-80; Alterra Corporation, Request for Rezone
Dear Mr. Haggard:
Now that the agreement has been negotiated, as recommended in the Examiner's
Report and Recommendation to the City Council, this matter is being sub-
mitted to the City Clerk this date for transmittal to the City Council for
review.
You will receive notification of final approval as well as a copy of the
enacting ordinance upon adoption by the City Council.
If further assistance or: information is desired, please do not hesitate to
contact this office.
Sincerely,
Fred J. Ka man
Hearing Examiner
cc: Delton Bonds/
City Clerk
Building & Zoning Department
OF R4,,
THE CITY OF RENTON
`• MUNICIPAL BUILDING 200 MILL AVE. $O. RENTON,WASH.98055
oNIL
BARBARA` Y. SHINPOCH, MAYOR • LAND USE HEARING EXAMINER
90 `O FRED J. KAUFMAN. 235-2593
09gr�p SEP�E�`e�Q December 3, 1982
Members of the City Council
Renton, Washington
RE: ALTERRA REZONE: FILE R-129-80)
Dear Council Members:
This office has reviewed that "Agreement" which by its terms purports to represent the
conditions recommended to the Council by this office in the report of July 29, 1982, on the
above entitled matter.
The agreement appears to further those purposes identified by both the city, the applicant, and
other concerned parties at the hearing stage. The conditions were intended to mitigate to
some extent the impact of the rezone and development of the subject site upon both the
unique riparian forest identified in the Environmental Impact Statement (EIS) and the flood
hazard of the valley.
•
The purpose for the easements and dedications of land was for both flood control purposes and
to preserve certain "valuable" natural habitat. The tenor of the entire hearing was to that •
effect. Under terms of the agreement, the applicant will be credited with the land so set aside
and will be entitled to develop the remaining acreage at a density equal to the entire acreage.
This is not unlike the case in which open space credit is given in the Planned Unit Development
process. Conclusion #8 specifically indicates that the applicant will be entitled to develop the
51 remaining acres as though it were 71 acres. There was no evidence presented at the
hearing which would have indicated that the land so carefully designated for greenbelt and
flood control might be used for other purposes, save utility easement.
The only reason the applicant agreed not to develop the entire acreage was the credit given
for flood control/habitat preservation which the record reflected was necessary to approve the
rezone. By rezoning the property under terms of the agreement, the city will in effect transfer
the development rights of the dedicated acreage to the remaining acreage. Since this is the
. case, the city could potentially violate the general density standards if it reserved the right to
develop the property for other than its intended flood control and open space uses.
Conclusion #7 indicated that the land should remain in open space perpetually in order for the
applicant to receive the development credit. That was the intent of the recommendation of
this office and the agreement as it now stands appears to carry out that intention.
I hope this correspondence assists you in your deliberations on this matter.
Sincerely,
\(0'w*Affj
Fred J. Kaufman
Hearing Examiner
OF I
THE CITY OF RENTON •
U •Z
POLICY DEVELOPMENT DEPARTMENT • 235-2552
0 MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH. 98055
09 �.
P
094), SEPT,140
BARBARA Y. SHINPOCH
MAYOR •
MEMORANDUM
DATE: December 2, 1982
TO: Fred J. Kaufman, Land Use Hearing Examiner
FROM: David R. Clemens, Policy Development Director II
SUBJECT: ALTERRA REZONE
We are in receipt of the final revised agreement for dedication of property under the
Alterra Rezone application. The Engineering Department is reviewing the legal
descriptions of the areas to be dedicated and they appear to generally consistent with
Exhibit #12 of the rezone, however, Mr. Haggard and I will be reviewing that map in
more detail on Friday, December 3rd, at 1:00 p.m.
As noted in paragraph #2 of the transmittal letter of November 30, 1982, the issue of
"other municipal purposes" for the areas to be dedicated is an issue which deserves
City Council deliberation.
Based upon the foregoing, we recommend that this matter be set for City Council
deliberation on December 6th.
Attachments: Revised final documents.
RECEIVED
CITY OF RFNTON
HEARING EXAMINER
DES' 2 1932
AM PM
7,8,9e10,11e12o1 0213►41510
e
HAGGARD, TOUSLEY & BRAIN
ATTORNEYS AND COUNSELORS AT LAW
RUSSELL F.TOUSLEY 1700 DAON BUILDING
JOEL E.HAGGARD 720 OLIVE WAY
CHRISTOPHER I.BRAIN
SEATTLE,WASHINGTON 98101 TELECOPIER
WILLIAM N. SNELL (206)624-5299 (206) 624-8959
WILLIAM H. BLOCK
MICHAEL G. FULBRIGHT
KIM D.STEPHENS
OUR FILE NO:
November 30, 1982
N-15004 .A
HAND DELIVERED
CITY OF RENTON
Mr . David R. Clemens UC.0 2 1982
Policy Develoment Director
POLICY
Policy Development Department DEVELOPMENT DEPT.
. City of Renton Municipal Bldg .
200 Mill Avenue South
Renton, Washington 98005
RE: Alterra Rezone Dedication
Dear Mr . Clemens:
Enclosed are two copies of a revised Agreement
(the "Agreement" ) which has been modified substantially
along the lines suggested in your letter to us of November
24, 1982 . One of the enclosed copies is marked to show
changes from the last draft and the other copy is a clean
one.
Sections 2 .1, 2 .2 and 2 .3 were amended as you
suggested, except that "other municipal purposes" was not
added to the easement purposes contained in Sections 2 .1
and 2 .2 . We do not believe that it is appropriate for
either the applicant or the various departments of the
City to go beyond the easement purposes specified by the
Hearing Examiner . We do not, however, intend to oppose
any suggestion that the City Council expand the easement
purposes to "other municipal purposes" and if it does so .
we can easily and quickly revise the Agreement . In
addition, given that the changes to Sections 2 .1 and 2 .2
contemplate the City locating structures upon the
Greenbelt. Property, a new sentence was added to Section 5
to protect the development rights of our clients.
With respect to Section 4, we made the form but
not the substantive changes which you suggested . The
reason is that we have no direct control over the govern-
mental approvals which will be needed to segregate the
Mr . David R. Clemens
December 1, 1982
Page 2
Greenbelt Property and the Flood Control Property into
separate legal lots. We did, however, add a sentence to
Section 4 which requires our clients to make application,
within one year of the final adoption of a rezone ordi-
nance to have said properties segregated into separate
legal lots.We believe the present version of Section 4
adequately protects the interests of both the City and our
clients.
If you have any questions, please feel free to
call.
Very truly yours,
HAGGARD, TOUSLEY & BRAIN
41/44-447A?' -1A7
Michael G. Fulbright
MGF/ab
9563B
Enclosures
cc: Mr . Ronald Neubauer
Mr . Del Bonds
•
AGREEMENT
This AGREEMENT (this "Agreement" ) is made
this day of , 1982, by and between
Renton Property Associates, a Washington general
partnership ( "RPA" ) , JAG-Renton Associates, a Washington
general partnership ( "JAG" ) , and the City of Renton, a
Washington municipal corporation (the "City" ) .
RPA is the fee owner of that certain real
property legally described on Exhibit 1 hereto ( "Parcel
A" ) and that certain real property legally described on
Exhibit 2 hereto ( "Parcel B" ) .
JAG is the owner of a contract vendee 's interest
in that certain real property legally described on Exhibit
3 hereto ( "Parcel C" ) pursuant to that certain Real Estate
Contract recorded as Instrument No . 8004240435 in the
Records of King County, Washington, by and between JAG and
John B. Hansen, Inc. , a Washington corporation
( "Hansen" ) . Hansen acquired its interest in Parcel C
pursuant to that certain Real Estate Contract recorded as
Instrument No . 8002220254 in the Records of King County,
Washington, by and between Hansen and Trustee.. in his
capacity as trustee pursuant to Order No . 221 issued in
Case No. 77 B 8999 by the Eastern Division of the United
States District Court for the Northern District of
Illinois.
Alterra Corporation, a Washington corporation
( "Alterra" ) , as agent for RPA and JAG, has requested the
City to rezone Parcel A, Parcel B, and Parcel C
(collectively the "Rezone Property" ) from their present
classification of G-1 to the new classification of M-P
under the City Municipal Code. A general diagram of the
Rezone Property is attached as Exhibit 4 hereto. The
City's Office of the Land Use Hearing Examiner has
recommended changing the zoning classification of the
Rezone Property to the M-P classification upon certain
terms and conditions as set forth in that certain Report
and Recommendation to the Renton City Council (the
"Report" ) dated July 29, 1982, issued under File No.
R-129-80 .
Now, therefore, the parties hereto do hereby
agree as follows:
Section 1 . Condition. Pursuant to the Report,
RPA and JAG are required to take certain actions before
the City ordinance on the rezone requested by Alterra is
heard and decided. The terms and conditions of this
Agreement shall be without prejudice to the City Council' s
deliberations on said ordinance, but this Agreement and
each and every provision herein are conditioned upon the
City 's changing the zoning classification of the Rezone
Property to M-P subject only to the terms and conditions
set forth in the Report . If the City fails to change the
zoning classification of the Rezone Property to M-P, this
Agreement shall be null and void and none of the parties
hereto shall have any rights hereunder .
12/01/82
7792B 1
• N, .
Section 2 . Easement Grant. The provisions of
this Section 2 are conditioned upon the City's compliance
with each and every term of this Agreement.
2 .1 RPA hereby conveys and quit claims to
the City an easement for greenbelt and open-space purposes
in those portions of that certain real property legally
described on Exhibits 5, 6 and 7 hereto (the "Greenbelt
Property" ) located within Parcel A and Parcel B and an
easement for greenbelt, open-space, wildlife habitat and
flood control purposes in that portion of that certain
real property described on Exhibit 8 hereto (the "Flood
Control Property" ) located within Parcel A. Prior to the
conveyance anticipated by Section 4 hereof, neither RPA
nor the City shall be entitled to locate any structures
upon the Greenbelt Property. RPA and the City shall each
be entitled to excavate the Flood Control Property for
flood control purposes and locate structures serving flood
control purposes, and no others, upon the Flood Control
Property.
2 .2 JAG hereby conveys and quit claims to
the City an easement for greenbelt and open-space purposes
in those portions of the Greenbelt Property located within
Parcel C and an easement for greenbelt, open-space,
wildlife habitat and flood control purposes in that
portion of the Flood Control Property located within
Parcel C. Prior to the conveyance anticipated by Section
4 hereof, neither JAG nor the City shall be entitled to
locate any structures upon the Greenbelt Property. JAG
and the City shall each be entitled to excavate the Flood
Control Property for flood control purposes and locate
structures serving flood control purposes, and no others,
upon the Flood Control Property.
2 .3 JAG and RPA hereby convey and quit
claim to the City an access easement over and across the
Rezone Property for purposes of excavating and
constructing flood control structures upon the Flood
Control Property; provided, that ( i) the City shall only
use such portions of the Rezone Property that are not
within the Greenbelt Property and or the Flood Control
Property (the "Retained Property" ) for such access
purposes as may be reasonably designated for such use by
RPA and or JAG, ( ii) the City shall make reasonable
efforts to restore and repair any damage caused by its use
of the Retained Property, and (iii) the City shall execute
and acknowledge any and all instruments reasonably
requested by RPA and or JAG for the purpose of confirming
the exact location or locations of the easement granted
the City by this Section 2 .3 .
2 .4 JAG and RPA each hereby reserve the
right to locate utility lines, including, without
limitation, lines for water, sewer, gas, electric and
telephone service, over and across the Greenbelt Property
and or the Flood Control Property and the right to enter
upon said properties for the purpose of installing,
maintaining and relocating such lines, provided that ( i)
JAG and or RPA shall make reasonable efforts to restore
such properties to their original condition after the
installation of any such utility lines and (ii) such
utility lines shall not be located in a manner that will '
12/01/82,
7792B 2
unreasonably interfere with either any then existing
utility lines of the City or any utility lines which the
City then has specific and definite plans to install in
specific locations.
Section 3. Limitation. The easement rights
granted the City herein are granted on a quit claim basis
only and are subject to all rights, covenants,
reservations, and restrictions applicable to the Greenbelt
Property and the Flood Control Property as of the date
hereof, including, without limitation, those matters
described in Exhibit 9 hereto.
Section 4 . Fee Title . Provided that the City is
not in breach of any of the terms and conditions hereof,
at such time or times as the Greenbelt Property and or the
Flood Control Property have been segregated into separate
legal lots, RPA and or JAG, as appropriate, shall quit
claim the fee title to the Greenbelt property and the
Flood Control Property to the City; provided that any such
conveyances shall ( i) be subject to all matters described
in Section 3 and Exhibit 9 hereof, (ii) restrict the City
from using the subject property except as set forth in
Section 2 hereof, and (iii) reserve the rights set forth
in Section 2 .3 hereof, and provided further that any
conveyance of all or part of the Flood Control Property
shall reserve a flood control easement in the Flood
Control Property for the grantor, which easement shall
include the right to excavate, locate structures upon and
maintain the subject property for flood control purposes.
RPA and JAG shall also (i) make application to the City,
within one year after the final adoption by the City
Council of an ordinance changing the zoning classification
of the Retained Property to M-P subject only to the terms
and conditions set forth in the Report, to have the
Greenbelt property in the Flood Control Property
segregated into separate legal lots.
Section 5 . Development Credit . Notwithstanding
either the easements granted the City under Section 2
hereof or a conveyance to the City pursuant to Section 4
hereof, for purposes of all land use and or building
applications of any kind related to the Retained Property,
the City and each of its individual departments, offices,
agencies, officers, agents and employees shall ( i) treat
the Retained Property as if it included the area of the
Greenbelt Property and the Flood Control Property within
its boundaries and (ii) credit the Retained Property with
the flood storage capacity of the Flood Control Property,
which credit shall include any increase in flood storage
capacity beyond that existing on the date hereof . In
addition, no buildings or other structures or improvements
located upon either the Greenbelt Property or the Flood
Control Property shall in any way reduce the number of
gross square feet which may be constructed upon the
Retained Property or increase any flood storage capacity
or storm water retention requirements for the Retained
Property. For example, without limitation, RPA and or JAG
shall receive credit for the development acreage
12/01/82
7792B 3
equivalencies of the Greenbelt Property and the Flood
Control Property and the flood storage capacity of the
Flood Control Property when developing the Retained
Property. Notwithstanding anything contained herein to
the contrary, the City shall not be obligated to allow the
construction of more than 995 ,781 .5 gross square feet upon
the Retained Property.
Section 6 . Joinder . Trustee and Hansen join in
this Agreement for the purpose of subjecting their
interests in the Greenbelt Property and the Flood Control
Property to the terms and conditions contained herein.
Furthermore, as long as Trustee and or Hansen retain an
interest in the Greenbelt Property and or the Flood
Control Property, they each agree to join in any future
conveyances pursuant to Section 4 hereof . The provisions
of this Section 6 shall be binding upon the successors and
assigns of Trustee and or Hansen.
Section 7. Miscellaneous .
7 .1 The captions of this Agreement are for
convenience only and shall not be considered or referred
to in resolving questions of interpretation or
construction.
7 .2 Each and all of the provisions of this
Agreement shall be binding upon and inure to the benefit
of each of the parties hereto, and their heirs, successors
and assigns.
IN WITNESS WHEREOF, the undersigned have entered
into this Agreement as of the date hereinabove first
mentioned.
CITY:
CITY OF RENTON,
a Washington municipal corporation
By
By
RPA:
RENTON PROPERTY ASSOCIATES,
a Washington general partnership
By
By
12/01/82
7792B 4
JAG:
JAG-RENTON ASSOCIATES ,
a Washington general partnership
By
Ronald G. Neubauer
General Partner
By
Delton J. Bonds
General Partner
By
Kenneth L. Thompson
General Partner
By
Merton Cohen
General Partner
TRUSTEE:
Richard B. Ogilvie, Trustee
HANSEN:
JOHN B. HANSEN, INC.
a Washington corporation
By
By
12/01/82
7792B 5
1 II/
STATE OF WASHINGTON
ss .
COUNTY OF KING
On this day personally appeared before me
and
, to me known to be
the and
respectively, of the City of Renton, the municipal
corporation that executed the within and foregoing
instrument, and acknowledged the said instrument to be the
free and voluntary act and deed of said corporation for
the uses and purposes therein mentioned, and on oath
stated that he was authorized to execute said instrument ,
and that the seal affixed is the corporate seal of said
corporation.
Given under my hand and official seal this
day of , 1982 .
Notary Public in and for the
State of Washington, residing
at
STATE OF WASHINGTON )
ss.
COUNTY OF KING
On this day personally appeared before me
and
, to me known to be
the and
respectively, of Renton Property Associates, the
partnership that executed the within and foregoing
instrument, and acknowledged the said instrument to be the
free and voluntary act and deed of said corporation for
the uses and purposes therein mentioned, and on oath
stated that he was authorized to execute said instrument .
Given under my hand and official seal this
day of , 1982.
Notary Public in and for the
State of Washington, residing
at
12/01/82
7792B 6
1
STATE OF WASHINGTON
ss.
COUNTY OF KING
On this day personally appeared before me Ronald
G. Neubauer , to me known to be a General Partner, of
JAG-RENTON ASSOCIATES, the partnership that executed the
within and foregoing instrument, and acknowledged the said
instrument to be the free and voluntary act and deed of
said corporation for the uses and purposes therein
mentioned, and on oath stated that he was authorized to
execute said instrument.
Given under my hand and official seal this
day of , 1982 .
Notary Public in and for the
State of Washington, residing
at
STATE OF WASHINGTON
ss.
COUNTY OF KING
On this day personally appeared before me Delton
J. Bonds, to me known to be a General Partner, of
JAG-RENTON ASSOCIATES, the partnership that executed the
within and foregoing instrument, and acknowledged the said
instrument to be the free and voluntary act and deed of
said corporation for the uses and purposes therein
mentioned, and on oath stated that he was authorized to
execute said instrument .
Given under my hand and official seal this
day of , 1982 .
Notary Public in and for the
State of Washington, residing
at
12/01/82
7792B 7
STATE OF WASHINGTON
ss .
COUNTY OF KING
On this day personally appeared before me Kenneth
L. Thompson, to me known to be a General Partner, of
JAG-RENTON ASSOCIATES, the partnership that executed the
within and foregoing instrument, and acknowledged the said
instrument to be the free and voluntary act and deed of
said corporation for the uses and purposes therein
mentioned, , and on oath stated that he was authorized to
execute said instrument.
Given under my hand and official seal this
day of , 1982 .
Notary Public in and for the
State of Washington, residing
at
STATE OF WASHINGTON
ss.
COUNTY OF KING )
On this day personally appeared before me Merton
Cohen, to me known to be a General Partner, of JAG-RENTON
ASSOCIATES, the partnership that executed the within and
foregoing instrument, and acknowledged the said instrument
to be the free and voluntary act and deed of said
corporation for the uses and purposes therein mentioned,
and on oath stated that he was authorized to execute said
instrument .
Given under my hand and official seal this
day of , 1982 .
Notary Public in and for the
State of Washington, residing
at
12/01/82
7792B 8
111
STATE OF WASHINGTON )
ss .
COUNTY OF KING )
On this day personally appeared before me Richard
V. Ogilvie, to me; known to be the individual described in
and who executed the within and foregoing instrument, and
acknowledged that he signed the same as his free and
voluntary act and, deed, for the uses and purposes therein
mentioned.
Given under my hand and official seal this
day of , 1982.
Notary Public in and for the
State of Washington, residing
at
STATE OF WASHINGTON )
ss.
COUNTY OF KING )
On this day personally appeared before me
and
, to me known to be
the and
respectively, of JOHN B. HANSEN, INC. , the corporation
that executed the within and foregoing instrument, and
acknowledged the said instrument to be the free and
voluntary act and deed of said corporation for the uses
and purposes therein mentioned, and on oath stated that he
was authorized to .execute said instrument, and that the
seal affixed is the corporate seal of said corporation.
Given under my hand and official seal this
day of , 1982 .
Notary Public in and for the
State of Washington, residing
at •
12/01/82
7792B 9
' I I
•
• 1 OF 2
EXHIBIT 1 TO
AGREEMENT
•
PARCEL A:
THAT PORTION OF THE SOUTHWEST QUARTER OF SECTION 13, TOWNSHIP 23 •
• NORTH, RANGE 4 EAST, W.H.• IN KING COUNTY, WASHINGTON; AND
THAT PORTION OF--JUNCTION ADDITION TO CITY OF SEATTLE, ACCORDING TO THE
• PLAT RECORDED IN VOLUME 12 OF PLATS, PAGE 75, IN KING COUNTY, •
WASHINGTON, TOGETHER WITH VACATED STREETS ADJOINING WHICH WOULD ATTACH
TO SAID PREMISES BY OPERATION OF LAW, AND OF C. E. BROWNELL'S DONATION.
CLAIM NO. 41- AND OF THAT. PORTION OF TRACT 26, RENTON SHORE LANDS 2ND
SUPPLEMENTAL, DESCRIBED AS FOLLOWS:
BEGINNING AT THE• SOUTH QUARTER CORNER OF SAID SECTION 13; THENCE NORTH
00°58'28" EAST ALONG THE NORTH-SOUTH CENTERLINE OF SAID SECTION 13 A
DISTANCE OF 884.84 FEET TO THE SOUTHEAST CORNER OF TRACT 26 OF RENTON
SHORELANDS SECOND SUPPLEMENTAL MAPS, 1958; THENCE SOUTH 72°37'52" WEST
ALONG THE SOUTH BOUNDARY OF SAID TRACT 26 A DISTANCE OF 382.60 FEET;
THENCE NORTH 70°54'02" WEST ALONG SAID SOUTH BOUNDARY OF TRACT 26 A
DISTANCE. OF- 73.50 FEET TO THE EAST LINE OF THE CHARLES BROWNELL
DONATION LAND CLAIM NO. 41 AND THE TRUE POINT OF BEGINNING; THENCE
CONTINUING NORTH 70°54'02" WEST ALONG SAID SOUTH- BOUNDARY OF TRACT 26 A
DISTANCE OF 281.02 FEET; THENCE SOUTH 73°56'01" WEST ALONG SAID SOUTH
BOUNDARY OF TRACT 26 A DISTANCE OF 130.08 FEET; THENCE SOUTH 41°16'07"
WEST ALONG SAID SOUTH BOUNDARY OF TRACT 26 A DISTANCE OF 316.18 FEET TO
THE NORTH BOUNDARY OF A TRACT OF LAND DEEDED TO KING COUNTY AND
DESCRIBED UNDER KING COUNTY AUDITOR'S FILE NO. 6607786: THENCE
WESTERLY ALONG SAID NORTH BOUNDARY ON A CURVE TO THE LEFT, THE CENTER
OF WHICH BEARS SOUTH 39°41'39" WEST HAVING A RADIUS OF 627.46 FEET AN
ARC -DISTANCE OF 434.70 FEET THROUGH A CENTRAL ANGLE OF 39°41'39";
THENCE NORTH A DISTANCE OF 25.00 FEET ALONG SAID NORTH BOUNDARY;
THENCE WEST A DISTANCE OF 280.69 FEET ALONG SAID NORTH BOUNDARY;
THENCE SOUTH 59°53'47" WEST ALONG SAID NORTH BOUNDARY A DISTANCE OF
377..52 FEET; THENCE SOUTH 74°13'19" WEST ALONG SAID NORTH BOUNDARY A
DISTANCE OF 443.31 FEET TO THE NORTHERLY MARGIN OF THE CHARLES MONSTER
COUNTY ROAD; THENCE NORTH 34°18'31" WEST ALONG SAID NORTHERLY MARGIN A
DISTANCE OF 43.46 FEET TO THE SOUTH LINE OF THE BURLINGTON NORTHERN
RAILROAD RIGHT-OF-WAY; THENCE ALONG A CURVE TO THE LEFT, ALONG SAID-
SOUTH LINE, THE CENTER OF WHICH BEARS NORTH 06°34'41" WEST HAVING A
RADIUS OF 696.00 FEET, AN ARC DISTANCE OF 45.43 FEET THROUGH A CENTRAL
ANGLE OF 03°44'25" TO A POINT OF COMPOUND CURVE; THENCE ALONG A CURVE
TO THE LEFT, ALONG SAID SOUTH LINE, THE CENTER OF WHICH 'BEARS NORTH
10°19'06" WEST HAVING A RADIUS OF 1,055.00 FEET, AN ARC DISTANCE OF
209.95 FEET THROUGH A CENTRAL ANGLE OF 11°24'08" TO A POINT OF COMPOUND
CURVE; THENCE ALONG A CURVE TO THE LEFT, ALONG SAID SOUTH LINE, THE
CENTER OF WHICH BEARS NORTH 21°43'14" WEST HAVING A RADIUS OF 727.00
FEET, AN ARC DISTANCE OF 214.77 FEET THROUGH A CENTRAL ANGLE OF
16°55'35" TO A POINT OF COMPOUND CURVE; THENCE ALONG A CURVE TO THE
LEFT, ALONG SAID SOUTH LINE, THE CENTER OF WHICH BEARS NORTH 38°38'49"
•
2 OF 2
WEST HAVING A RADIUS OF 1,571.00 FEET, AN ARC DISTANCE OF 206.57 FEEI
THROUGH A CENTRAL ANGLE OF 07°32'02" TO A POINT OF TANGENCY; THENCE
NORTH 43°49'09" EAST ALONG SAID SOUTH LINE A DISTANCE OF 97.17 FEET TO
A LINE 35 FEET SOUTHERLY OF AND PARALLEL WITH THE CENTERLINE OF THE
EXISTING MOST SOUTHERLY TRACK OF THE CHICAGO, MILWAUKEE, ST. PAUL Mil
PACIFIC RAILROAD TRACKS; THENCE ALONG SAID PARALLEL LINE ON A CURVE TO
THE RIGHT, THE CENTER OF WHICH BEARS SOUTH 42°43' 18" EAST HAVING A
RADIUS OF 696.89 FEET, AN ARC DISTANCE OF 40.09 FEET THROUGH A CENTRAL
ANGLE OF 03°17'45"; THENCE NORTH 50°34'27" EAST ALONG SAID PARALLEL
LINE A DISTANCE OF 248.50 FEET; THENCE ALONG SAID PARALLEL LINE ON A
CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH 39°25'33" EAST
HAVING A RADIUS OF 676.58 FEET, AN ARC DISTANCE OF 93.64 FEET THROUGH A
CENTAL ANGLE OF 07°55'47" TO A POINT OF REVERSE CURVE; THENCE ALONG
SAID PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS
NORTH 31°29 '46" WEST HAVING A RADIUS OF 428.64 FEET, AN ARC. DISTANCE OF
73.32 FEET THROUGH A CENTRAL ANGLE OF. 09°48 '04" TO A POINT OF REVERSE .
CURVE; THENCE ALONG SAID PARALLEL LINE ON A CURVE TO THE RIGHT, THE
CENTER OF WHICH..BEARS SOUTH 41°17'50" EAST HAVING A RADIUS OF 2,580.74
FEET, AN ARC DISTANCE OF 437.40 FEET THROUGH .A CENTRAL ANGLE OF
09°42'39" TO A POINT OF COMPOUND CURVE; THENCE ALONG SAID PARALLEL LINE
ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH 31°35'll"
EAST HAVING A RADIUS OF 2,790.19 FEET, AN ARC DISTANCE OF 789.44 FEET
THROUGH A CENTRAL ANGLE OF 16°12'39" TO THE EAST LINE OF THE CHARLES
BROWNELL DONATION LAND CLAIM NO. 41 ; THENCE SOUTH O1°24'04" WEST ALi?AG
SAID EAST LINE A DISTANCE OF 950.58 FEET TO THE TRUE POINT OF
BEGINNING.
•
•
1 OF 3
EXHIBIT 2 TO •
AGREEMENT .
•
•
PARCM. B:
THAT PORTION OF Co E. BROWNELL'S DONATION CLAIM NO. 41, AND OF THE
SOUTHWEST QUARTER AND THE SOUTHEAST QUARTER OF SECTION 13, TOWNSHIP 23
NORTH, RANGE 4 EAST, W.M., IN KING COUNTY, WASHINGTON, DESCRIBED AS
FOLLOWS:
BEGINNING AT THE SOUTH QUARTER CORNER OF SAID SECTION 13;
THENCE
00°58.28" EAST ALONG THE NORTH—SOUTH CENTERLINE OF SAID SECTION 13OATN
DISTANCE OF 884.84 FEET TO THE SOUTHEAST CORNER OF TRACT 26 OF RENTOO
SHORELANDS SECOND SUPPLEMENTAL MAPS, 1958; THENCE SOUTH 72°37'52" WET
ALONG THE SOUTH BOUNDARY OF SAID TRACT 26 A DISTANCE OF 382.60 'FEET; .
THENCE NORTH 70°54°02" WEST ALONG SAID SOUTH BOUNDARY OF TRACT 26 A
DISTANCE OF 73.50 FEET TO THE EAST LINE .OF THE CHARLES BROWNELL
DONATION LAND CLAIM NO. 41; THENCE NORTH. 01°24604" EAST ALONG SAID
EAST LINE OF THE CHARLES BROWNELL DONATION LAND CLAIM NO. 41 A DISTAXE
OF 950.58 FEET TO A LINE 35 FEET SOUTHERLY OF AND PARALLEL WITH THE
CENTERLINE OF THE .EXISTING MOST SOUTHERLY TRACK OF THE CHICAGO,
MILWAUKEE, ST. PAUL C PACIFIC RAILROAD TRACKS AND THE TRUE POINT OF
BEGINNING; THENCE WESTERLY ALONG SAID PARALLEL LINE ON A CURVE TO THE
LEFT, THE CENTER OF WHICH BEARS SOUTH 15°22'32" EAST HAVING. A RADIUS2+F
2790.19 FEET, AN ARC DISTANCE OF 789.44 FEET THROUGH A CENTRAL ANGLE DV
16°12'39" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
•
• 2 OF 3
PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS SOUTH
31°35'11" EAST HAVING A RADIUS OF 2580.74 FEET, AN ARC DISTANCE OF
437.40 FEET THROUGH A CENTRAL ANGLE OF 09°42'39" TO A POINT OF REVERSE
CURVE; THENCE CONTINUING ALONG SAID PARALLEL LINE ON A CURVE TO THE
RIGHT, THE CENTER OF WHICH BEARS NORTH 41°17'50" WEST HAVING A RADIUS
OF 428.64 FEET, AN ARC DISTANCE OF 73.32 FEET THROUGH A CENTRAL ANGLE
OF 09°48'04" TO A POINT OF REVERSE CURVE; THENCE CONTINUING ALONG SAID
PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS SOUTH
31°29'46" EAST HAVING A RADIUS OF 676.58 FEET, AN ARC DISTANCE OF 93.64
FEET THROUGH A CENTRAL ANGLE OF 07°55'47" TO A POINT OF TANGENCY;
THENCE CONTINUING ALONG SAID PARALLEL .LINE SOUTH 50°34'27" WEST A
DISTANCE OF 248.50 FEET TO A POINT OF CURVE ; THENCE CONTINUING ALONG
SAID PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS
SOUTH 39°25'33" EAST HAVING A RADIUS OF 696.89 FEET, AN ARC DISTANCE OF
40.09 FEET THROUGH A CENTRAL ANGLE OF 03°17'45" TO THE 'SOUTH LINE OF
THE BURLINGTON NORTHERN RAILROAD RIGHT-OF-WAY; THENCE NORTH 43°49'09"
EAST ALONG SAID SOUTH LINE A DISTANCE OF 173.83 FEET TO A POINT OF
CURVE; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE
RIGHT, THE CENTER OF WHICH BEARS SOUTH 46°10'51" EAST HAVING A RADIUS
OF 4030.00 FEET, AN ARC DISTANCE OF 197.57 FEET THROUGH A CENTRAL ANGLE
OF 02°48'32" TO A POINT OF COMPOUND CURVE ; THENCE CONTINUING ALONG SAID
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
43°22'19" EAST HAVING A RADIUS OF 1853.00 FEET, AN ARC DISTANCE OF
194.75 FEET THROUGH A CENTRAL ANGLE OF 06°01' 18" TO A POINT OF COMPOUND
CURVE; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE RIGHT,
THE CENTER OF WHICH BEARS SOUTH 37°21'O1" EAST HAVING A RADIUS OF
10543.00 FEET, AN ARC DISTANCE OF 186.51 FEET THROUGH A CENTRAL ANGLE
OF 01°00'49" TO A POINT OF COMPOUND CURVE ; THENCE CONTINUING ALONG SAID
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
36°20'12" EAST HAVING A RADIUS OF 1657.00 FEET AN ARC DISTANCE OF
193.93 FEET THROUGH A CENTRAL ANGLE OF 06°42'20" TO A POINT OF COMPOUND
CURVE; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE RIGHT,
THE CENTER OF WHICH BEARS SOUTH 29°37'52" EAST HAVING A RADIUS OF
6738.00 FEET, AN ARC DISTANCE OF 197.76 FEET THROUGH A CENTRAL ANGLE OF
01°40'54" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
27°56'58" EAST HAVING A RADIUS OF 1768.00 FEET, AN ARC DISTANCE OF
194.45 FEET THROUGH A CENTRAL ANGLE OF 06°18'06" TO A POINT OF COMPOUND
CURVE; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE RIGHT,
THE CENTER OF WHICH BEARS SOUTH 21°38'52" EAST HAVING A RADIUS OF
8603.00 FEET, AN ARC DISTANCE OF 204.54 FEET THROUGH A CENTRAL ANGLE OF
O1°21'44" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
20°17'08" EAST HAVING A RADIUS OF 1922.10 FEET, AN ARC DISTANCE OF
178.79 FEET THROUGH A CENTRAL ANGLE OF 05°19'46" TO A POINT OF COMPOUND
CURVE ON THE EAST LINE OF SAID CHARLES BROWNELL DONATION LAND CLAIM NO.
41; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE RIGHT,
THE CENTER OF WHICH BEARS SOUTH 14°57'22" EAST HAVING A RADIUS OF
2814.93 FEET, AN ARC DISTANCE OF 659.42 FEET THROUGH A CENTRAL ANGLE OF
13°25'19" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
.�•,
Q (.q�eiM`s'rY:.` YX:lSR_��ty ': �� "r - -"" �.
3 OF 3
01°32'03" EAST HAVING A RADIUS OF 1165.09 FEET, AN ARC DISTANCE OF
1097.05 FEET THROUGH A CENTRAL ANGLE OF 53°57'00" TO A POINT OF
TANGENCY; THENCE CONTINUING ALONG SAID SOUTH LINE SOUTH 37°35'03" EAS'
A DISTANCE OF 308.70FEET TO A POINT OF CURVE; THENCE CONTINUING ALONI
SAID SOUTH LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS
NORTH 52°24'57" EAST HAVING A RADIUS OF 1005.37 FEET, AN ARC DISTANCE
OF 45.82 FEET THROUGH A CENTRAL ANGLE OF 02°36'41" TO A LINE 35 FEET
SOUTHERLY OF AND 'PARALLEL WITH THE CENTERLINE OF THE EXISTING MOST
SOUTHERLY TRACK OF THE CHICAGO, MILWAUKEE, ST. PAUL E PACIFIC RAILROAE
TRACKS; THENCE WESTERLY ALONG SAID PARALLEL LINE NORTH 40°11'44" WEST
DISTANCE OF 126.24 FEET TO A POINT OF CURVE ; THENCE CONTINUING ALONG
SAID PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS
, SOUTH 49°48'16" WEST HAVING A RADIUS OF 1829.78 FEET, AN ARC DISTANCE
OF 309.67 FEET THROUGH A CENTRAL ANGLE OF 09°41 '48"; THENCE NORTH
•49°53'32" WEST ALONG SAID PARALLEL LINE A DISTANCE OF 167.07 FEET TO A
POINT OF CURVE; THENCE CONTINUING ALONG SAID PARALLEL LINE ON A CURVE
TO THE LEFT, THE CENTER OF WHICH BEARS SOUTH 40°06'28" WEST HAVING A
RADIUS OF 1102.46 FEET, AN ARC DISTANCE OF 807.11 FEET THROUGH A
CENTRAL ANGLE OF 41°56'46" TO A POINT OF COMPOUND CURVE; THENCE
CONTINUING ALONG SAID PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER
OF WHICH BEARS SOUTH O1°50' 18" EAST HAVING A RADIUS OF 2790.19 FEET, k
ARC DISTANCE OF 659.24 FEET THROUGH A CENTRAL ANGLE OF 13°32' 14" TO
THE TRUE POINT OF BEGINNING.
i .
1 OF 2
•
•
•
EXHIBIT 3 TO
AGREEMENT
•
PARCEL C:
THAT PORTION OF TRACT 25, RENTON SHORELANDS 2ND SUPPLEMENTAL; AND
THAT PORTION OF THE SOUTHEAST QUARTER OF SECTION 13, AND THE
SOUTHWEST QUARTER OF SECTION 13, AND THE SOUTHWEST QUARTER
OF SECTION 18, ALL IN TOWNSHIP 23 NORTH, RANGE 4 EAST, W.M.•
IN KING COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS:
BEGINNING AT THE SOUTH QUARTER CORNER OF SAID SECTION 13;
THENCE NORTH 00°58'28" EAST ALONG THE NORTH-SOUTH CENTERLINE •
OF SAID SECTION 13, A DISTANCE OF 884.84 FEET TO THE
SOUTHEAST CORNER OF TRACT 26 OF RENTON SHORELANDS SECOND
SUPPLEMENTAL MAPS, 1958, AND THE TRUE POINT OF BEGINNING;
THENCE SOUTH 72°37'52" WEST ALONG THE SOUTH BOUNDARY OF SAID
TRACT 26, A DISTANCE OF 382.60 FEET;
THENCE NORTH 70°51002" WEST ALONG THE SOUTH BOUNDARY OF SAID
TRACT 26, A DISTANCE OF 73.51 FEET TO. THE EAST LINE OF THE
CHARLES BROWNELL DONATION LAND CLAIM NO. 41;
THENCE NORTH O1°24'04" EAST ALONG SAID EAST LINE, A DISTANCE
OF 950.58 FEET TO ' A LINE 35 FEET SOUTHERLY OF AND PARALLEL •
WITH THE CENTERLINE OF THE EXISTING MOST SOUTHERLY TRACK OF
• THE CHICAGO, MILWAUKEE, ST. PAUL AND PACIFIC RAILROAD TRACTS;
THENCE ALONG SAID LINE 35 FEET SOUTHERLY OF AND PARALLEL
WITH THE CENTERLINE OF THE MOST SOUTHERLY TRACK, ALONG A
CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
15°22'32" EAST, HAVING A RADIUS OF 2,790.19 FEET, AN ARC
W, .
di
1
2 OF 2
•
!I DISTANCE OF 659.24 FEET THROUGH A CENTRAL ANGLE OF 13°32' 14"
TO A POINT OF COMPOUND CURVE;
THENCE ALONG A CURVE TO THE RIGHT, ALONG SAID PARALLEL LINE,'
THE CENTER OF WHICH BEARS SOUTH O1°50' 18" EAST HAVING A
RADIUS OF 1,102.46 FEET, AN ARC DISTANCE OF 807.11 FEET
THROUGH A CENTRAL ANGLE OF 41°56'46"; THENCE SOUTH 49°53'32"
EAST, ALONG SAID PARALLEL LINE, A DISTANCE OF 167.07 FEET ;
THENCE ALONG A CURVE TO THE RIGHT, ALONG SAID PARALLEL LINE, .
HAVING A RADIUS OF 1,829.78 FEET, AN ARC DISTANCE OF 309.67
FEET THROUGH A CENTRAL ANGLE OF 09°41'48" ; THENCE
LEAVING SAID PARALLEL LINE, SOUTH 40°11 '44" EAST, A
DISTANCE OF .126.24 FEET TO A POINT ON THE SOUTH LINE OF THE
BURLINGTON NORTHERN RAILROAD RIGHT-OF-WAY ;
THENCE ALONG A CURVE TO THE LEFT, ALONG SAID SOUTH LINE, THE
CENTER OF WHICH BEARS NORTH 49°48'16" EAST HAVING A RADIUS
OF 1,005.37 FEET, AN ARC DISTANCE OF 549.02 FEET THROUGH A
CENTRAL ANGLE OF 31°17 '19" TO A POINT OF TANGENT ON SAID
SOUTH LINE OF THE BURLINGTON NORTHERN RAILROAD RIGHT-OF-WAY;
THENCE CONTINUING ALONG SAID SOUTH LINE, SOUTH 71°29'03"
EAST ALONG A LINE 50 FEET SOUTH OF AND PARALLEL WITH THE
EXISTING SOUTHBOUND TRACK, A DISTANCE OF 826.56 FEET TO THE
WEST LINE OF SAID SECTION 18; THENCE CONTINUING ALONG SAID
SOUTH LINE SOUTH 71°29 '03" EAST, A DISTANCE 'OF85.52 FEET TO THE
NORTH LINE OF THE SOUTH 650 FEET OF THE SOUTHWEST QUARTER OF
THE SOUTHWEST QUARTER OF SAID SECTION 18; THENCE NORTH
89°10'25" WEST ALONG THE NORTH LINE OF SAID SOUTHWEST QUARTER
OF THE SOUTHWEST QUARTER OF SECTION 18, A DISTANCE OF 81.57
FEET TO THE EAST LINE OF .THE SOUTHEAST QUARTER OF SAID SECTION
13; THENCE NORTH 88°15 '00" WEST ALONG THE NORTH LINE OF THE
NORTH 650 FEET OF THE SOUTHEAST QUARTER OF SAID SECTION 13,
A DISTANCE OF 2,261 .41 FEET TO AN ANGLE POINT ON THE SOUTH
BOUNDARY OF TRACT 25 OF RENTON SHORE LANDS, 1958; THENCE
NORTH 33°07'25" WEST ALONG SAID SOUTH BOUNDARY, A DISTANCE
OF 154.51 FEET TO AN ANGLE POINT; THENCE NORTH 27°21'32"
EAST ALONG SAID SOUTH BOUNDARY, A DISTANCE OF 387.32 FEET
TO AN ANGLE POINT; THENCE NORTH 83°17'25" WEST ALONG SAID SOUTH
BOUNDARY, A DISTANCE OF 171.17 FEET; THENCE SOUTH 46°22'22"
WEST ALONG SAID SOUTH BOUNDARY, A DISTANCE OF 324.66 FEET ;
THENCE SOUTH 72°37'52". WEST ALONG SAID SOUTH BOUNDARY, A
DISTANCE OF 76.33 FEET TO THE TRUE POINT OF BEGINNING.
.si ,, .:._ , , ,
. ,
• 1 OF 2
f.
L
EXHIBIT 4 TO
AGREEMENT
,
The Company has not surveyed the premises described in k?') 1=�-%Z�
The sketch below is furnished without charge solely for the purpose of assisting
in locating said premises and the Company assumes no liability for inaccuracies
therein. It does not purport to show all highways, roads and easements adjoining
or affecting said premises.
I , •
I
I zg -
'
v
0 . 1 .
f 1 GI
b I , Y
r ' w
I 6 1 . 1
I tit .
•
i./I\ \� N • s
7
ale \' ,y
1)
1 ." _ <
v
,
I •
\' \
� ` -
1
•.r
I is / . '
I g
I
a
o -4. 4 1 V
Z � r\ o
w I �' �' 4.
Vrt.."-•—• I\ \ ' t+�11.
CN 1..11.1z__
2 OF 2
The Company has not surveyed the premises described in N.22)Ii_a_�
The sketch below is furnished without charge solely for the purpose of assisting
in locating said premises sand the Company assumes no liability for inaccuracies
therein. It does not purport to show all highways, roads and easements adjoining
or affecting said premises. ++ \
\
t+.RZLH Lll.►E_.
\N
\• \
•
•
IP 5. ' • • .
U I I:----
s D 10
m
r �� +! ro
('
1, - r
s / - •
i— —_____ - /
/ 7QH.1 +vQi.ria2S - A
J D
D i
if
/
/
u � .4
I
I
i
I -
•
l 7
N
1
= —� .. -- ... .. s ..-. .-..-,- _.---- ....-„,:,.may,.,., ...s.i'..e:......».asa" _'4,,....4,-..4;<`".=.:? 'P.<±,,:,Sb/`3?"`,.Y.Y.,. _ 41
jili
416
EXHIBIT 5 TO
AGREEMENT,
That portion of the south half of Section 13, Township 23 North, Range 4 East, W.M.
in King County, Washington and of Junction Addition to the City of Seattle, according
to plat recorded in Volume 12 of Plats, page 75, records of said King County, and of
C.E. Brownell 's Donation Claim No. 41 described as follows:
Beginning at the south quarter corner of said Section 13; thence N00°58128"E along
the north-south centerline thereof 1092.82 feet; thence N68°03 '54"E .224.45 feet to
the TRUE POINT OF BEGINNING; thence S68°03'54"W 575.56 feet; thence N72°04'34"W
389.92 feet; thence S68°06'46"W 429.32 feet; thence south 85.47 feet to a point of
curve; thence on a curve to the left, having a radius of 60.00 feet, thru a central
angle of 126°52' 10", an arc distance of 132.86 feet; thence N53°07'50"E 199.18 feet .
to a point of curve; thence on a curve to the right, having a radius of 200.00 feet
thru a central angle of 53°59'30", an arc distance of 188.47 feet; thence S72°52'40"E
290.00 feet to a point of curve; thence on a curve to the left, having a radius of
197.00 feet, thru a central angle of 39°08'51", an arc distance of 134.60 feet; thence
N67°58'29"E 380.92 feet; thence N31°27'12"E 204.86 feet to the TRUE POINT OF BEGINNING.
Containing 165,263 square feet or 3.794 acres more or less.
•
•
•
•
•
EXHIBIT .6 TO
AGREEMENT
That portion of the south half of Section 13, Township 23 North, Range 4 East, W.M.
in King County, Washington, of Junction Addition to the City of Seattle, according
to the plat recorded in Volume 12 of Plats, page 75, records of said King County,
and of C.E. Brownell 's Donation Claim No. 41 , described as follows:
Beginning at the south quarter corner of said Section 13; thence N00°58'28"E along
the north-south centerline thereof 1092.82 feet; thence 568 03 54 'W 351.11 feet to
the TRUE POINT OF BEGINNING; thence N68°03'54"E 575.56 feet; thence N80°04'48"E
232.00 feet; thence 542°06'08"E 215.00 feet; thence N49°16'27"E 47.54 feet; thence
N41°23'00"W 158.97 feet to a point of curve; thence on a_curve to the left, having
a radius of 145.00 feet, thru a central angle of 60°38'00", an arc distance of
153.45 feet; thence 577°59'00"W �07.77 feet to a point of curve; thence on a curve
to the right, having a radius of 230.00 feet, thru a central angle of 79°13'15",
an arc distance of 318.01 feet; thence S82°15'00"W 457.99 feet; thence 560°16'00"W
28.17 feet; thence S34°20'00"E 357.51 feet to a point which bears N72°04'34"W from
the TRUE POINT OF BEGINNING; thence S72°04'34"E 43.35 feet to the TRUE POINT OF
BEGINNING.
Containing 180,421 square feet or 4.142 acres more or less.
EXHIBIT 7 TO: .
AGREEMENT
That portion of the southwest quarter of Section 13, Township 23 North, Range 4 East,
W.M. in King County, Washington and that portion of Junction Addition to City of
Seattle, according to plat recorded in Volume 12 of Plats, page 75, records of said
King County, together with vacated streets adjoining which would attach to said
premises by operation of law, and of C.E. Brownell 's Donation Claim No. 41 , described
as follows:
Beginning at the south quarter corner of said Section 13; thence NOO°58'28"E along
the north-south centerline thereof 884.84 feet to the southeast corner of Tract 26,
Renton Shorelands Second Supplemental Maps 1958; thence S72°37'52"14 382.60 feet to
an angle point in the south line of said Tract 26; thence N70°54'02"W 354.53 feet to
' an angle point in the south line of said Tract 26; thence S73°56'01"W 130.08 feet to
an angle point in the south line of said Ti-act 26; thence 541°16'07"W along the south
line of said Tract 26 a distance of 316.18 feet to the north boundary of a tract of
land deeded to King County and described under King County Recording Number 6607786;
thence westerly along said north boundary on a curve to the left, the center which
bears S39°41 '39"W 627.46 feet, thru a central. angle of 39°41 '39"; an arc distance of
434.70 feet; thence north along said north boundary 25.00 feet; thence west along
said north boundary 245.69 feet to the TRUE POINT OF BEGINNING; thence north 156.13
feet; thence N50°39' 19"E 330.21 feet; thence N33°00'54"W 109.47 feet to the southerly
margin of the Burlington Northern Railroad Right-of-Way, said point being a point on
a curve, the center which bears. S39°23'00"E 1853.00 feet; thence westerly along said
southerly margin and curve to the left, thru a central angle of 3°59'19", an arc
distance of 129.00 feet to a point of compound curve, the center of said curve bears
S43°22' 19"E 4030.00 feet; thence westerly along said southerly margin and curve to
the left, thru a central angle of 2°48'32", an arc distance of 197.57 feet to a point
of tangency; thence S43°49'09"W along said south margin 271 .00 feet to a point of
curve; thence on a curve to the right along said southerly margin, having a radius
of 1571 .00 feet, thru a central angle of 7°32'02", an arc distance of 206.57 feet to
a point of compound curve, the center which bears N38°.38'49"W 727.00 feet; thence
westerly along said southerly margin and curve to the right, thru a central angle of
16°55'35", an arc distance-of 214.77 feet to a point of compound curve, the center
which bears N21°43'14"W 1055.00 feet; thence westerly along said southerly margin
and curve to the right, thru a central angle of 11°24'08", an arc distance of 209.95
feet to a point of compound curve; the center which bears N1O°19'06"W 696.00 feet;
thence westerly along said southerly margin and curve to the right thru a central of
3°44'25", an arc distance of 45.43 feet to the easterly margin of the Charles Monster
County Road; thence S34°18'31"E along said easterly margin 43.46 feet to the north
boundary of said tract deeded to King County and described under King County Record-
ing Number 6607786; thence N74°13' 19"E along said north boundary 443.31 feet; thence
N59°53'47"E along said north boundary 377.52 feet; thence east along said north
boundary 35.00 feet to the TRUE POINT OF BEGINNING.
Containing 114,401 square feet or .2. 626 acres more or less.
•
•
EXHIBIT 8 TO
AGREEMENT
That portion of the south half of Section 13, Township 23 North, Range 4 East, W.M.
in King County, Washington; and of Junction Addition to the City of Seattle, according
to the plat recorded in Volume 12 of Plats, page 75, records of said King County,
together with vacated streets adjoining which would attach to said premises by opera-
tion of Law; and of C.E. Brownell 's Donation Claim No. 41 , and of Tracts 25 and 26,
Renton Shore Lands 2nd Supplemental Maps 1958, described as follows:
Beginning at the south quarter corner of said Section 13; thence N00°58'28"E along the
north-south centerline thereof 1092.82 feet; thence N68°03 '54"E 224.45 feet to a point
hereinafter called "Point A"; thence 568.°03 '54"W 575.56 feet; thence N72°04134"W
389.92 feet; thence 568°06'46"W 429.32 feet to the TRUE POINT OF BEGINNING; thence
south 85.47 feet to a point of curve; thence on a curve to the left, having a radius
of 60.00 feet, thru a central angle of 126°52'10", an arc distance of 132.86 feet;
thence N53°07'50"E 199.18 feet to a point of curve; thence on a curve to the right,
having a radius of 200.00 feet thru a central angle of 53°59'30", an arc distance of
188.47 feet; thence 572°52'40"E 290.00 feet to a point of curve; thence on a curve to
the left having a radius of 197.00 feet, thru a central angle of 39°08;51", an arc
distance of 134.60 feet;---thence N67°58'29"E- 380.92 feet;_ thence N31°27'12"E.204.86
feet to aforementioned "Point A"; thence N80°04'48"E 232.00 feet; thence S42°06'08"E
215.00 feet; thence S31°14'05"W 358.99 feet; thence S47°10'01"E 71 .34 feet; thence
east 114.27 feet; thence south 68.91 feet to the southerly line of said Tract 25;
thence along the southerly line of said Tracts 25 and 26, the following courses and
distances: N88°15'00"W 180.65 feet; 1433°07 '25"W 154.51 feet; N27°21 '32"E 387.32
feet; N83°17'25"W 171 .17 feet; S46°22'22"W 324.66 feet; S72°37'52"W 458.93 feet;
N70°54'02"W 354.53 feet; S73°56'01"W 130.08 feet; and 541°16'07"W 316.18 feet to the
north boundary of a tract of land deeded to King County and described under King
County Receiving Number 6607786; thence westerly along said north boundary on a curve
to the left, the center which bears 539°41 '39"W 627.46 feet thru a central angle of
39°41 '39", an arc distance of 434.70 feet; thence north along said north boundary
25.00 feet; thence west along said north boundary 245.69 feet; thence north 156.13 .
feet; thence N50°39'19"E 330.21 feet; thence S78°41 '24"E 180.00 feet to a point of
curve; thence on a curve to the right, having a radius of 195.01 feet, thru a central
angle of 78°41 '24", an arc distance of 267.83 feet to the TRUE POINT OF BEGINNING.
Containing 382,725 square feet or 8.786 acres more or less.
A
♦ a ,
0
EXHIBIT 9 TO
AGREEMENT
1 . The portions .of the Greenbelt Property and the Flood
Control Property located within Parcel A are subject
to the following:
( i) Rights, reservations, covenants and
restrictions contained in that certain Supplemental
Agreement, recorded as Instrument No . 8012230800 in the
Records of King County, Washington;
( ii) Rights, reservations, covenants and
restrictions contained in that certain Real Estate
Contract recorded as Instrument No , 8009300609 in the
Records of King County, Washington;
( iii) Easement recorded under Instrument No .
6626569 in the Records of King County, Washington;
( iv) Easement granted to the City of Renton on
November 14, 1962, under Application No . 27583 ; and
(v) Easement granted to King County Drainage
District No. 1 on %August 11, 1960, under Application No.
25422 .
II
2 . The portion of the Greenbelt Property located within
Parcel B is subject to the following:
(i ) Rights, reservations, covenants and
restrictions contained in that certain Real Estate
Contract recorded Instrument. No . 8009300611 in the
Records of King Coiunty, Washington; and
( ii) Easement recorded under Instrument No .
6626569 in the Records of King County, Washington.
3 . The portions of the Greenbelt Property and the Flood
Control Property located within Parcel C are subject
to the following:
( i) Rights, reservations, covenants and
restrictions contained in that certain Real Estate
Contract recorded as Instrument No . 8002220257 in the
Records of King County, Washington;
(ii) Rights, reservations, covenants and
restrictions contained in that certain Real Estate
Contract recorded as Instrument No . 8004240435 in the
Records of King County, Washington;
09/22/82
7794B 1
41/1
. Y
} 401
` Q
( iii) Rights, reservations, covenants and
restrictions contained in that certain deed recorded under
Instrument No . 5780049 in the Records of King County,
Washington;
( iv) Easement granted to the City of Renton on
November 14, 1962,, under Application No . 27583 ;
(v) Easement recorded under Instrument No .
8108200425 in the Records of King County, Washington; and
(vi) Easement granted to King County Drainage
District No . 1 on August 11, 1960, under Application No.
25422 .
09/22/82
7794B 2
--- .
pri __
% OF R&A t
.► . ., 0 THE CITY OF RENTON
U c% 'Z
POLICY DEVELOPMENT DEPARTMENT • 235-2552
n r 5' rn MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.98055
0,9A Pam.
0,9-1T�D SEP1 ��
BARBARA Y. SHINPOCH
MAYOR
•
• November 24, 1982
Haggard, Tousley and Brain
1700 Daon Budding
720 Olive Way
Seattle, WA 98101
ATTENTION: Joal Haggard
SUBJECT: ALTERRA REZONE DEDICATION
Dear Mr. Haggard:
Pursuant to our phone conversation of this morning, please find attached the corrections we
propose in Section 2.1, 2.2, 2.3 and 4.0. The Policy Development, Public Works, Building
Department and City Attorney will all be recommending the "other municipal purposes"
provisions for both the greenbelt and flood control zone areas. These four departments feel
that without that provision, the agreement would ultimately become unworkable.
At the present time, our intention is to present the Examiner's report along with the revised
agreement to the City Council on December 6th. We would need the corrected agreement to
be available for transmittal to the City Council by Thursday, December 2nd, in order to meet
the December 6th review date.i
If I can be of assistance, please feel free to contact me at your earliest convenience.
Very iy'yours, /
avidlR.` lemens
Policy Development Director
DRC:cl ,)
cc: Daniel Kellogg
Robert E. Bergstrom
Roger J. Blaylock
.ac..L4.VI, L . casement Grant . The. provisions of
this Sectio_n ;2 are conditioned upon 1 City 's compliance
with each d every term of this Agri- __:ant. •
2 .1 RPA hereby conveys and quit claims to
the City an easement for greenbelt and open-space and
oth.en_mun,i.a4g1. purposes
in those portions of that certain real property legally
described on Exhibits 5, 6 and 7 hereto (the "Greenbelt •
Property' ) located within Parcel A and Parcel B and an
easement for greenbelt, open-space w.i.edti6e habitat
and flood control
and others mun cipaL •
purposes in that portion of that certain. real property
described on Exhibit 8 hereto (the "Flood Control
Property" ) loated within Parcel A. pntian to the conveyance
. anticipated under. 4ect.Lon 4 Neither RPA nor the
City shall be entitled to locate any structures upon the
Greenbelt Property. RPA and the City shall each be
entitled to excavate the Flood Control Property for flood • •
• control purposes and locate structures serving flood
control purposes, and no others, upon the Flood Control
Property.
; 2 .2 JAG hereby conveys and quit claims to
the City an easement for greenbelt and open-space and •
othen mun.ic.idat purposes .
in those portions of the Greenbelt Property located within
Parcel C and an easement for greenbelt, open-space and
.witdtilie habitat •
flood control and other mun.ie.ipa.2 punpoa ez
• in that portion of the Flood
Control Property located within Parcel C. pn.ion to
the conveyance anticipated unden4Sect,ion 4 Neither JAG nor
the City shall be entitled to locate any structures upon
the Greenbelt Property . JAG and the City shall each be
entitled to excavate the Flood Control Property for flood
control purposes and locate structures serving flood
• control purposes, and no others, upon the Flood Control
Property.
2 .3 JAG and RPA hereby convey and quit
claim to the City an access easement over and across the /✓el/
Rezone Property for purposes of excavating and
constructing flood control structures upon the Flood
Control Property; provided, that (i ) the City shall only
use such portions of the Rezone Property that are not
within the Greenbelt Property and or the Flood Control
Property (the "Retained Property" ) for such access
purposes as may be reasonably designated for such use by
RPA and or JAG, (ii) the City shall make neaaenabLe
ebionts to restore and repair any
damage caused; by its use of the Retained Property, and
( iii ) the City shall execute and acknowledge any and all
instruments reasonably requested by RPA and or JAG for the
purpose of confirming the exact location or locations of
the easement granted the City by this Section 2 .3 .
2 .4 JAG and RPA each hereby reserve the
right to locate utility lines, including, without
limitation, lines for water, sewer , gas, electric and
telephone service, over and across the Greenbelt Property
and or the Flood Control Property and the right to enter
upon said properties for the purpose of installing,
maintaining and relocating such lines, provided that ( i)
JAG and or RPA shall make reasonable efforts to restore
such properties to their original condition after the
installation of any such utility lines and ( ii) such
utility lines : shall not be located in a manner that will
unreasonably interfere with either any then existin
utilitv_ lines ,of the City or any utility lines which the
City then has ; s.lecific and definite plans to install—in
specific locations. -
Section 3. Limitation. The easement rights
granted t- City herein are granted a quit claim basis
only and subject to all rights, enants,
reservations and restrictions applicable to the Greenbelt
Property andl, the Flood Control Property as of the date
hereof, including, without limitation, those matters
described in Exhibit 9 hereto.
Section 4 . Fee Title . Provided that the City is
not in breach of any of the terms and conditions hereof,
at such timcior times ac the Greenbelt Property and or the
Flood Con-trot Property have been segregated into separate
legal lot3, RPA and or JAG, as appropriate, shall within
one yeah o4 he execution oU this instnument, quit
claim the fete title to the Greenbelt Pnopenty and the
F.eood Con-no! Pnopenty said p roperticc to the City;
provided that any such conveyances shall ( i) be subject to
all matters described in Section 3 and Exhibit 9 hereof,
(ii) restrict the City from using the subject property
except as set forth in Section 2 hereof, and ( iii) reserve
the rights set forth in Section 2 .3 hereof, and provided
further that any conveyance of all or part of the Flood
Control Property shall reserve a flood control easement in
the Food Contno!
cubjcct property for the grantor, Which easement shall
include the right to excavate, locate structures upon and
maintain the subject property for flood control purposes.
Section 5 . Development Credit . Notwithstanding
either the easements granted the City under Section 2
hereof or a conveyance to the City pursuant to Section 4
hereof, for purposes of all land use and or building_
applications of any kind related to the Retained Property,
the City and each of its individual departments, offices,
agencies, officers, agents and employees shall ( i) treat
the Retained Property as if it included the area of the
Greenbelt P operty and the Flood Control Property within
its boundaries and (ii) credit the Retained Property with
the flood storage capacity of the Flood Control Property,
which credit shall include any increase in flood storage
capacity beyond that existing op the date hereof . For
example, without limitation, RPA and or JAG shall receive
credit for the development acreage equivalencies of the
Greenbelt Property and the Flood Control Property and the
flood storage capacity of the Flood Control Property when
developim^the Retained Propertotwithstanding
anything contained herein to the contrary, the City shall
not be obligated to allow the construction of more than
995 ,781 .5 gross square feet upon the Retained Property.
Section 6 . Joinder . Trustee and- Hansen join in
this Agreement for the purpose of subjecting their
interests in the Greenbelt Property and the Flood Control
Property to the terms and conditions contained herein.
Furthermore, as long as Trustee and or Hansen retain an
interest in the Greenbelt Property and or the Flood
Control Property, they each agree to join in any future
conveyances pursuant to Section 4 hereof . The provisions
of this Section 6 shall be binding upon the successors and
assigns of Trustee and or Hansen .
Section 7 . Miscellaneous .
7 . 1 The captions of this Agreement are for
convenience only and shall not be considered or referred
to in resolving questions of interpretation or
construction.
11/03/82
7792B 3
1 � `
OF R4,
41 ® _a 1171L -�17 ,_J� E CITY OF RENTON
NOV 198 PO DEVELOPMENT DEPARTMENT • 235-2552
� 16
MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.98055
WARREN KELLOGG
'9 /7/0.Z
grEp SEPlE° 6Y
BARBARA Y. SHINPOCH MEMORANDUM
- MAYOR
Dom/ ,*Ti9A✓
AT
%7W/7- t'T /.v G/ //f 5 o/V. /Tewe
HAGGARD, TOUSLEY & BRAIN
ATTORNEYS AND COUNSELORS AT LAW
RUSSELL F.TOUSLEY 1700 DAON BUILDING
JOEL E.HAGGARD 720 OLIVE WAY
CHRISTOPHER I.BRAIN SEATTLE,WASHINGTON 98101 TELECO PIER
WILLIAM N. SNELL (206)624-5299 (206)624-8959
WILLIAM H. BLOCK
MICHAEL G. FULBRIGHT
KIM D.STEPHENS
November 3 , 1982 OUR FILE NO:
15004
Mr . David R. Clemens
Policy Development Director
Policy Development Department CITY OF RENTON
City of Renton
Municipal Building NOV 5 1982
200 Mill Avenue South
Renton, Washington 98055 POLICY
DEVELOPMENT OFPT.
RE: Alterra Rezone Dedication
Dear Mr . Clemens:
Enclosed is a Agreement (the "Agreement" ) which
has been revised in accordance with our letter to, you of
October 22, 1982 . The enclosed Agreement is marked to
show the changes from the previous Agreement . In addition
to the matters discussed in our letter to you of October
22 , 1982 , a couple of additional typographical errors,
which are marked on the enclosed Agreement, were corrected
and the second paragraph on page 1 of the Agreement was
revised to indicate that Renton Property Associates has
acquired fee ownership of Parcel A.
Also, with a couple of exceptions, copies of the
items set forth on Exhibit 9 to the Agreement are
enclosed. The exceptions are the easement granted to the
City of Renton on November 14, 1962 under Application
No . 27583 and the, Easement granted to King County Drainage
District No . 1 on. August 11, 1960 under Application
No . 25422 . Apparently, neither of the aforementioned
easements was recorded . I assume you can obtain access to
the easement granted to the City of Renton. As for the
easement granted to King County Drainage District No . 1 ,
we are in the process of tracking' it down and will forward
a copy to you as soon as it is available . Its absences
should not be a basis from getting this to the Council.
NOV 161982
WARREN&t KELLOGG
By
I
Mr . David R. Clemens
November 3 , 1982
Page 2
If you have any questions, please feel free to
call.
Very truly yours,
HAGGARD, TOUSLEY & BRAIN
Michael G. Fulbright
MGF/dlb
8950B
Enclosures
cc: Mr . Del Bonds
Ron Neubauer, Esq.
i J j
1 r
COPY MARKED TO SHOW CHANGES
(_06_-_INDICATES DELETION)
AGREEMENT
This AGREEMENT (this "Agreement" ) is made
this day of; , 1982, by and between
Renton Property Associates, a Washington general
partnership ( "RPA" ) , JAG-Renton Associates, a Washington
general partnership ( "JAG" ) , and the City of Renton, a
Washington municipal corporation (the "City" ) .
RPA is the fee owner of that certain real Revi5-e4
property legally described on Exhibit 1 hereto ( "Parcel
A" ) and that certain real property legally described on
Exhibit 2 hereto ( "Parcel B" ) .
JAG is the owner of a contract vendee's interest
in that certain real property legally described on Exhibit
3 hereto ( "Parcel ' C" ) pursuant to that certain Real Estate
Contract recorded1as Instrument No. 8004240435 in the
Records of King County, Washington, by and between JAG and
John B. Hansen, Inc. , a Washington corporation
("Hansen" ) . Hansen acquired its interest in Parcel C
pursuant to that certain Real Estate Contract recorded as
Instrument No . 8002220254 in the Records of King County,
Washington, by and between Hansen and Trustee in his
capacity as trustee pursuant to Order No . 221 issued in
Case No . 77 B 8999 by the Eastern Division of the United
States District Court for the Northern District of
Illinois.
Alterra Corporation, a Washington corporation
("Alterra" ) , as agent for RPA and JAG, has requested the
City to rezone Parcel A, Parcel B, and Parcel C
(collectively the '"Rezone Property" ) from their present
classification of1G-1 to the new classification of M-P
under the City Municipal Code . A general diagram of the
Rezone Property is attached as Exhibit 4 hereto. The
City's Office of the Land Use Hearing Examiner has
recommended changing the zoning classification of the
Rezone Property to the M-P classification upon certain
terms and conditions as set forth in that certain Report
and Recommendation to the Renton City Council (the
"Report" ) dated July 29, 1982, issued under File No.
R-129-80 .
Now, therefore, the parties hereto do hereby
agree as follows:
Section l. Condition. Pursuant to the Report ,
RPA and JAG are required to take certain actions before
the City ordinancelon the rezone requested by Alterra is
heard and decided . , The terms and conditions of this
Agreement shall be without prejudice to the City Council's
deliberations on said ordinance, but this Agreement and
each and every provision herein are conditioned upon the
City's changing the zoning classification of the Rezone
Property to M-P subject only to the terms and conditions
set forth in the Report . If the City fails to change the
zoning classification of the Rezone Property to M-P, this
Agreement shall belnull and void and none of the parties
hereto shall have any rights hereunder.
11/03/82
7792B 1
1
1
I
Section 2 . Easement Grant. The provisions of
this Section 2 are conditioned upon the City's compliance
with each and every term of this Agreement. ,,�.y✓
2 .1 RPA hereby conveys a d quit cla ' s to
the City an easement for greenbelt�C "open-space purposes
in those portions! of that certain real property legally
described on Exhibits 5, 6 and 7 hereto (the "Greenbelt
Property" ) located within Parcel A an Parcel B and an 4a
an easement for greenbelt, open-space dad flood control o
purposes in that portion of that certain real property
descr ' d on Exhibit 8 hereto (the "Flood Control
perty" ) located within Parcel A. Neither RPA nor the
City shall be entitled to locate any structures upon the
;V s Greenbelt Property. RPA and the City hall each be ,/ 1
entitled to excavate the Flood Control operty for flood 4A control purposes and locate structures se 'ng flood
74r51:1
control purposes, ' and no others, upon the Floo VI
Property. - , V
2 .2 � JAG hereby conveys and quit cl ims to
the City an easement for greenbelt and open-space purposes
in those portions ' of the Greenbelt Property located within
Parcel C and an easement for greenbelt, open-space, and tA
flood control purposes in that portion of the Flood
Control Property to ed within Parcel C. Neither JAG nor
the City s e ,entitled to locate any s uctures upon -Z=1-4-1
/ the enbelt Property. JAG and the City sh 1 each be /
ntitled to excavate the Flood Control Propert for flood ✓ , p
control purposes and locate structures serving f
control purposes, land no others, upon the Flood Control . . '
Property.
'2 .31 JAG and RPA hereby convey and quit
claim to the City an access easement over and across the (V e 1 A/
Rezone Property for purposes of excavating and
constructing flood control structures upon the Flood
Control Property; provided, that (i) the City shall only
use such portions of the Rezone Property that are not
within the Greenbelt Property and or the Flood Control
Property (the "Retained Property" ) for such access
purposes as may be, reasonably designated for such use by
RPA and or JAG, (ii) the City shall restore and repair any
damage caused by its use of the Ret ined Property, and
(iii) the City shall execute and ack owledge any and all
instruments reasonably requested by and or JAG for the
purpose of confirming the exact locatio or locations of
the easement granted the City by this Sect .3 .
2 .4 IJAG and RPA each hereby reserve the
right to locate utility lines, including, withoutAiro 41'
limitation, lines for water, sewer, gas, electric and
telephone service, over and across the Greenbelt Property
and or the Flood Control Property and the right to enter
upon said properties for the purpose of installing,
maintaining and relocating such lines, provided that ( i)
JAG and or RPA shall make reasonable efforts to restore
such properties toltheir original condition after the
installation of any such utility lines and (ii) such
utility lines shall not be located in a manner that will
unreasonably interfere with either any then existing '
utilitv_liues of the City or any utility lines which the
City then has specific and definite plans to install in
specific locations:
11/03/82 ,
7792B I 2
1
I
Section 3 . Limitation. The easement rights
granted the City herein are granted on a quit claim basis
only and are subject to all rights, covenants,
reservations, and' restrictions applicable to the Greenbelt
Property and the Flood Control Property as of the date
hereof, including, without limitation, those matters
described in Exhibit 9 hereto.
Section 4 . Fee Title . Provided that the City is
not in breach of any of the terms and conditions hereof,
o-
I
i___g l 41 RPA and or JAG, as appropriate, shall quit Q.,.a.
claim the fee title to r_ _r__ _ to the Cit ,
provided that any - conveyances shall ( i) be subject to u,G�
all matters de - ibed in Section 3 and Exhibit 9 hereof, Cl
(ii) res the City from using the subject property
e , as set forth in Section 2 hereof, and (iii) reserve tg .
the rights set forth in Section 2 .3 hereof, and provided
further that any conveyance of all or part of the Flood
Control Prop rty shall reserve a flood control easement in
64, ,� the .e-crb j lfroperty for the grantor, which easement shall
Pf~ include the right to excavate, locate structures upon and
� ain in the subject property for flood control purposes.
eser5
Section 5 . Development Credit . Notwithstanding
either the easements granted the City under Section 2
hereof or a conveyance to the City pursuant to Section 4
hereof, for purposes of all land use and or building
applications of any kind related to the Retained Property,
the City and each of its individual departments, offices,
agencies, officers, agents and employees shall (i) treat
the Retained Property as if it included the area of the
Greenbelt Property and the Flood Control Property within
its boundaries and (ii) credit the Retained Property with
the flood storage 'capacity of the Flood Control Property,
which credit shall include any increase in flood storage
capacity beyond that existing on the date hereof . For
example, without limitation, RPA and or JAG shall receive
credit for the development acreage equivalencies of the
Greenbelt Property and the Flood Control Property and the
flood storage capacity of the Flood Control Property when
developing, a Retained Propert otwithstanding
anything contained: herein to the contrary, the City shall
not be obligated to allow the construction of more than •
995 ,781 .5 gross square feet upon the Retained Property.
-
Section 6'. Joinder . Trustee and Hansen join in
this Agreement for the purpose of subjecting their
interests in the Greenbelt Property and the Flood Control
Property to the terms and conditions contained herein.
Furthermore, as long as Trustee and or Hansen retain an
interest in the Greenbelt Property and or the Flood
Control Property, they each agree to join in any future
conveyances pursuant to Section 4 hereof . The provisions
of this Section 6 shall be binding upon the successors and
assigns of Trustee and or Hansen.
Section 7. Miscellaneous . •
7 .1 The captions of this Agreement are for
convenience only and shall not be considered or referred
to in resolving questions of interpretation or
construction.
11/03/82
7792B I 3
1
•
e ti
7 .2 Each and all of the provisions of this
Agreement shall be binding upon and inure to the benefit
of each of the parties hereto, and their heirs, successors
and assigns.
IN WITNESS WHEREOF, the undersigned have entered
into this Agreement as of the date hereinabove first
mentioned.
CITY:
CITY OF RENTON,
a Washington municipal corporation
By
By
RPA:
RENTON PROPERTY ASSOCIATES,
a Washington general partnership
By
By
JAG:
JAG-RENTON ASSOCIATES ,
a Washington general partnership
By
Ronald G. Neubauer
General Partner
By
Delton J. Bonds
General Partner
By
Kenneth L. Thompson
General Partner •
By
Merton Cohen
General Partner
11/03/82
7792B 4
TRUSTEE:
Richard B. Ogilvie, Trustee
HANSEN:
JOHN B. HANSEN, INC.
a Washington corporation
By
By
STATE OF WASHINGTON )
ss.
COUNTY OF KING )
On this day personally appeared before me
and
, to me known to be
the and
respectively, of the City of Renton, the municipal
corporation that executed the within and foregoing
instrument, and acknowledged the said instrument to be the
free and voluntary act and deed of said corporation for
the uses and purposes therein mentioned, and on oath
stated that he was' authorized to execute said instrument,
and that the seal affixed is the corporate seal of said
corporation.
Given under my hand and official seal this
day of , 1982 .
Notary Public in and for the
State of Washington, residing
at
11/03/82
7792B 5
STATE OF WASHINGTON )
ss.
COUNTY OF KING
On this day personally appeared before me
and
, to me known to be
the and
respectively, of Renton Property Associates, the
partnership that executed the within and foregoing
instrument, and acknowledged the said instrument to be the
free and voluntary act and deed of said corporation for
the uses and purposes therein mentioned, and on oath
stated that he was authorized to execute said instrument .
Given under my hand and official seal this
day of , 1982 .
Notary Public in and for the
State of Washington, residing
at
STATE OF WASHINGTON )
ss.
COUNTY OF KING )
On this day personally appeared before me Ronald
G. Neubauer, to me known to be a General Partner, of
JAG-RENTON ASSOCIATES, the partnership that executed the
within and foregoing instrument, and acknowledged the said
instrument to be the free and voluntary act and deed of
said corporation for the uses and purposes therein
mentioned, and on oath stated that he was authorized to
execute said instrument .
Given under my hand .and_official seal this
day of I , 1982 .
Notary Public in and for the
State of Washington, residing
at
11/03/82
7792B 6
STATE OF WASHINGTON )
) ss .
COUNTY OF KING i )
On this day personally appeared before me Delton
J. Bonds, to me known to be a General Partner, of
JAG-RENTON ASSOCIATES, the partnership that executed the
within and foregoing instrument, and acknowledged the said
instrument to be the free and voluntary act and deed of
said corporation for the uses and purposes therein
mentioned, and on, oath stated that he was authorized to
execute said instrument.
Given under my hand and official seal this
day of , 1982 .
Notary Public in and for the
State of Washington, residing
at
STATE OF WASHINGTQN )
ss.
COUNTY OF KING )
On this day personally appeared before me Kenneth
L. Thompson, to me known to be a General Partner, . of
JAG-RENTON ASSOCIATES, the partnership that executed the
within and foregoing instrument, and acknowledged the said
instrument to be the free and voluntary act and deed of
said corporation for the uses and purposes therein
mentioned, and on loath stated that he was authorized to
execute said instrument .
Given under my hand and official seal this
day of , 1982 .
Notary Public in and for the
State of Washington, residing
at
11/03/82
7792B 7
I
STATE OF WASHINGTON )
) ss .
COUNTY OF KING )
On this :day personally appeared before me Merton
Cohen, to me known to be a General Partner, of JAG-RENTON
ASSOCIATES, the partnership that executed the within and
foregoing instrument, and acknowledged the said instrument
to be the free and voluntary act and deed of said
corporation for the uses and purposes therein mentioned,
and on oath stated that he was authorized to execute said
instrument.
Given under my hand and official seal this
day of , 1982 .
Notary Public in and for the
I State of Washington, residing
at
STATE OF WASHINGTON )
ss.
COUNTY OF KING l )
On this day personally appeared before me Richard
V. Ogilvie, to melknown to be the individual described in
and who executed the within and foregoing instrument, and
acknowledged that ,he signed the same as his free and
voluntary act and 'deed, for the uses and purposes therein
mentioned.
Given under my hand and official seal this
day of I , 1982 .
Notary. Public in and for the
State of Washington, residing
at
1
11/03/82
7792B 8
1
STATE OF WASHINGTON )
) ss .
COUNTY OF KING )
On this day personally appeared before me
and
, to me known to be
the and
respectively, of JOHN B. HANSEN, INC. , the corporation
that executed the within and foregoing instrument, and
acknowledged the said instrument to be the free and
voluntary act andIdeed of said corporation for the uses
and purposes therein mentioned, and on oath stated that he
was authorized to execute said instrument, and that the
seal affixed is the corporate seal of said corporation.
Given under my hand and official seal this
day of , 1982.
i
Notary Public in and for the
State of Washington, residing
at
11/03/82
7792B 9
I .
• 1 OF 2
EXHIBIT 1 TO
AGREEMENT
•
PARCEL A: •
THAT PORTION OF THE SOUTHWEST QUARTER OF SECTION 13, TOWNSHIP 23 •
. . NORTH, RANGE 4 EAST, N.M.• IN KING COUNTY, WASHINGTON; AND
THAT PORTION OFJUN;CTION ADDITION TO CITY OF SEATTLE, ACCORDING TO THE
PLAT RECORDED IN VOLUME 12 OF PLATS, PAGE 75, IN KING COUNTY, '
WASHINGTON, TOGETHER WITH VACATED STREETS ADJOINING WHICH WOULD ATTACH
TO SAID PREMISES BYIOPERATION OF LAW, AND OF C. E. BROWNELL'S DONATION
CLAIM NO. 41- AND OF THAT PORTION OF TRACT 26, RENTON SHORE LANDS 2N0
SUPPLEMENTAL, DESCRIBED AS FOLLOWS:
BEGINNING AT THE SOUTH QUARTER CORNER OF SAID SECTION 13; THENCE NORTH
00°58'28" EAST- ALONG THE NORTH-SOUTH CENTERLINE OF SAID SECTION 13 A
DISTANCE OF 884.84 FEET TO THE SOUTHEAST CORNER OF TRACT 26 OF RENTON
SHORELANDS SECOND SUPPLEMENTAL MAPS, 1958; THENCE SOUTH 72°37'52" WEST
ALONG THE SOUTH BOUNDARY OF SAID TRACT 26 A DISTANCE OF 382.60 FEET;
THENCE NORTH 70°54'02" WEST ' ALONG SAID SOUTH BOUNDARY OF TRACT 26 A
DISTANCE. OF- 73.50 FEET TO THE EAST LINE OF THE CHARLES BROWNELL •
DONATION LAND CLAIM, NO. 41 AND THE TRUE POINT OF BEGINNING; THENCE
CONTINUING NORTH 70°54'02" WEST ALONG SAID SOUTH BOUNDARY OF TRACT 26 1
DISTANCE OF 281.02 FEET; THENCE SOUTH 73°56'Ol" WEST ALONG SAID SOUTH
BOUNDARY OF TRACT 26 A DISTANCE OF 130.08 FEET; THENCE SOUTH 41°16'07"
WEST ALONG SAID SOUTH BOUNDARY OF TRACT 26 A DISTANCE OF 316.18 FEET T(
THE NORTH BOUNDARY OF A TRACT OF LAND DEEDED TO KING COUNTY AND
DESCRIBED UNDER KING COUNTY AUDITOR'S FILE NO. 6607786; THENCE
WESTERLY ALONG SAID NORTH BOUNDARY ON A CURVE TO THE LEFT, THE CENTER
OF WHICH BEARS SOUTH 39°41'39" WEST HAVING A RADIUS OF 627.46 FEET AN
ARC DISTANCE OF 434:70 FEET THROUGH A CENTRAL ANGLE OF 39°41'39";
THENCE NORTH A DISTANCE OF 25.00 FEET ALONG SAID NORTH BOUNDARY;
THENCE WEST A DISTANCE OF 280.69 FEET ALONG SAID NORTH BOUNDARY;
THENCE SOUTH 59°53'47" WEST ALONG SAID NORTH BOUNDARY A DISTANCE OF
377.52 FEET; THENCE 'SOUTH 74°13'19" WEST ALONG SAID NORTH BOUNDARY A
DISTANCE OF 443.31 FEET TO THE NORTHERLY MARGIN OF THE CHARLES MONSTER
COUNTY ROAD; THENCE NORTH 34°18'31" WEST ALONG SAID NORTHERLY MARGIN A
DISTANCE OF 43.46 FEET TO THE SOUTH LINE OF THE BURLINGTON NORTHERN
RAILROAD RIGHT-OF-WO; THENCE ALONG A CURVE TO THE LEFT, ALONG SAID
SOUTH LINE, THE CENTER OF WHICH BEARS NORTH 06°34°41" WEST HAVING A
RADIUS OF 696.00 FEET, AN ARC DISTANCE OF 45.43 FEET THROUGH A CENTRAL
ANGLE OF 03°44'25" TO A POINT OF COMPOUND CURVE; THENCE ALONG A CURVE
TO THE LEFT, ALONG SAID SOUTH LINE, THE CENTER OF WHICH BEARS NORTH
10°19'06" WEST HAVING A RADIUS OF 10055.00 FEET. AN ARC DISTANCE OF
• 209.95 FEET THROUGH A CENTRAL ANGLE OF 11°24'08" TO A POINT OF COMPOUND
CURVE; THENCE ALONG A CURVE TO THE LEFT, ALONG SAID SOUTH LINE, THE
CENTER OF WHICH BEARS NORTH 21°43.14" WEST HAVING A RADIUS OF 727.00
FEET, AN ARC DISTANCE OF 214.77 FEET THROUGH A CENTRAL ANGLE OF
16°55'35" TO A POINT1OF COMPOUND CURVE; THENCE ALONG A CURVE TO THE
LEFT, ALONG SAID SOUTH LINE, THE CENTER OF WHICH BEARS NORTH 38°38'49"
2 OF 2
WEST HAVING A RADIUS OF 1,571.00 FEET, AN ARC DISTANCE OF 206.57 FEET
THROUGH A CENTRAL ANGLE OF 07°32'02" TO A POINT OF TANGENCY; THENCE
NORTH 43°49'09" EAST ALONG SAID SOUTH LINE A DISTANCE OF 97.17 FEET TO
A LINE 35 FEET SOUTHERLY OF AND PARALLEL WITH THE CENTERLINE OF THE
EXISTING MOST SOUTHERLY TRACK OF THE CHICAGO, MILWAUKEE, ST. PAUL A'
PACIFIC RAILROAD TRACKS; THENCE ALONG SAID PARALLEL LINE ON A CURVE TO
THE RIGHT, THE CENTER OF WHICH BEARS SOUTH 42°43' 18" EAST HAVING A
RADIUS OF 696.89 FEET, AN ARC DISTANCE OF 40.09 FEET THROUGH A CENTRAL
ANGLE OF 03°17'45"; THENCE NORTH 50°34'27" EAST ALONG SAID PARALLEL
LINE A DISTANCE OF1,248.50 FEET; THENCE ALONG SAID PARALLEL LINE ON A
CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH 39°25'33" EAST
HAVING A RADIUS OF 676.58 FEET, AN ARC DISTANCE OF 93.64 FEET THROU[ [ A
CENTAL ANGLE OF 07°55'47" TO A POINT OF REVERSE CURVE; THENCE ALONG
SAID PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS
NORTH 31°29'46" WEST HAVING A RADIUS OF 428.64 FEET, AN ARC. DISTANCE OF
73.32 FEET THROUGH A CENTRAL ANGLE OF. 09°48 '04" TO A POINT OF REVERSE
CURVE; THENCE ALONG SAID PARALLEL LINE ON A CURVE TO THE RIGHT, THE
CENTER OF WHICH- BEARS SOUTH 41°17'50" EAST HAVING A RADIUS OF 2,580.74
FEET, AN ARC DISTANCE OF 437.40 FEET THROUGH A CENTRAL ANGLE OF
09°42'39" TO A POINT OF COMPOUND CURVE; THENCE ALONG SAID PARALLEL LINE
ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH 31°35' 11"
EAST HAVING A RADIUS OF 2,790.19 FEET, AN ARC DISTANCE OF 789.44 FEET
THROUGH A CENTRAL ANGLE OF 16°12'39" TO THE EAST LINE OF THE CHARLES
BROWNELL DONATION LAND CLAIM NO. 41 ; THENCE SOUTH O1°24'04" WEST ALA
SAID EAST LINE A DISTANCE OF 950.58 FEET TO THE TRUE POINT OF
BEGINNING.
•
•
•
•
•
•
1 OF 3
•
EXHIBIT 2 TO
AGREEMENT .
- _... .
•
•
•
•
•
. ---- PARCEL B: ..
THAT PORTION OF C. E. BROWNELL'S DONATION CLAIM NO. 41, AND OF THE
SOUTHWEST QUARTER AND THE SOUTHEAST QUARTER OF SECTION 13, TOWNSHIP 23
NORTH, RANGE 4 EAST, W.M., IN KING COUNTY, WASHINGTON, DESCRIBED AS
FOLLOWS:
BEGINNING AT THE SOUTH QUARTER CORNER OF SAID SECTION 13;
THENCE
00°58'28" EAST ALONG THE NORTH-SOUTH CENTERLINE OF SAID SECTION 130ATN
DISTANCE OF 884.84 FEET TO THE SOUTHEAST CORNER OF TRACT 26 OF RENTON
SHORELANDS SECOND SUPPLEMENTAL MAPS, 1958; THENCE SOUTH 72°37'52" WElT
ALONG THE SOUTH BOUNDARY OF SAID TRACT 26 A DISTANCE OF 382.60 FEET; .
THENCE NORTH 70°54'02" WEST ALONG SAID SOUTH BOUNDARY OF TRACT 26 A
DISTANCE OF 73.50 FEET TO THE EAST LINE -OF THE CHARLES BROWNELL
DONATION LAND CLAIM ND. 41; THENCE NORTH. 01°24'04" EAST ALONG SAID
EAST LINE OF THE CHARLES BROWNELL DONATION LAND CLAIM NO. 41 A DISTANCE
OF 950.58 FEET TO A LINE 35 FEET SOUTHERLY OF AND PARALLEL WITH THE
CENTERLINE OF THE -EXISTING MOST SOUTHERLY TRACK OF THE CHICAGO,
MILWAUKEE, ST. PAUL E PACIFIC RAILROAD TRACKS AND THE TRUE POINT OF
BEGINNING; THENCE WESTERLY ALONG SAID PARALLEL LINE ON A CURVE TO THE
LEFT, THE CENTER OF WHICH BEARS SOUTH 15°22'32" EAST HAVING A RADIUSE,F
2790.19 FEET, AN ARC DISTANCE OF 789.44 FEET THROUGH A CENTRAL ANGLE W
16°12'39" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
i; ,ir ^ V `•"�!.+.'fit l •
r 2e -•
yr
2 OF 3
PARALLEL LINE ON A 'CURVE TO THE LEFT, THE CENTER OF WHICH BEARS SOUTH
31°35°11" EAST HAVING A RADIUS OF 2580.74 FEET, AN ARC DISTANCE OF
437.40 FEET THROUGH A CENTRAL ANGLE OF 09°42'39" TO A POINT OF REVERSE
CURVE; THENCE CONTINUING ALONG SAID PARALLEL LINE ON A CURVE TO THE
RIGHT, THE CENTER OF WHICH BEARS NORTH 41°17'50" WEST HAVING A RADIUS
OF 428.64 FEET, AN 'ARC DISTANCE OF 73.32 FEET THROUGH A CENTRAL ANGLE
OF 09°48'04" TO A POINT OF REVERSE CURVE; THENCE CONTINUING ALONG SAID
PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS SOUTH
31°29'46" EAST HAVING A RADIUS OF 676.58 FEET, AN ARC DISTANCE OF 93.64
FEET THROUGH A CENTRAL ANGLE OF 07°55'47" TO A POINT OF .TANGENCY;•
THENCE CONTINUING ALONG. SAID PARALLEL .LINE SOUTH 50°34'27" WEST A
DISTANCE OF 248.50 FEET TO A POINT .OF CURVE; THENCE CONTINUING ALONG
SAID PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS
SOUTH 39°25'33" EAST HAVING A RADIUS OF 696.89 FEET, AN ARC DISTANCE OF
40.09 FEET THROUGH A CENTRAL ANGLE OF 03°17'45" TO THE SOUTH LINE OF
THE BURLINGTON NORTHERN RAILROAD RIGHT-OF-WAY; THENCE NORTH 43°49'09"
EAST ALONG SAID SOUTH LINE A DISTANCE OF 173.83 FEET TO A POINT OF
CURVE; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE
RIGHT, THE CENTER OF WHICH BEARS SOUTH 46°10'51" EAST HAVING A RADIUS
OF 4030.00 FEET, AN1ARC .DISTANCE OF 197.57 FEET THROUGH A CENTRAL ANGLE
OF 02°48'32" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID_
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
43°22'19" EAST HAVING A RADIUS OF 1853.00 FEET, AN ARC DISTANCE OF
194.75 FEET THROUGH IA CENTRAL ANGLE OF 06°O1'18" TO A POINT OF COMPOUND
CURVE; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE RIGHT,
, THE CENTER OF WHICH !BEARS . SOUTH 37°21°01" EAST HAVING A RADIUS OF
10543.00 FEET, AN ARC DISTANCE OF 186.51 FEET THROUGH A CENTRAL ANGLE - -
OF O1°00'49" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
36°20'12" EAST HAVING A RADIUS OF 1657.00 FEET AN ARC DISTANCE OF
193.93 FEET THROUGH A CENTRAL ANGLE OF 06°42'20" TO A POINT OF COMPOUND
CURVE; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE RIGHT,
THE CENTER OF WHICH BEARS SOUTH 29°37'52" EAST HAVING A RADIUS OF
6738.00 FEET, AN ARC! DISTANCE OF 197.76 FEET THROUGH A CENTRAL ANGLE OF
O1°40'54" TO A POINT! OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
27°56'58" EAST HAVING A RADIUS OF 1768.00 FEET, AN ARC DISTANCE OF
194.45 FEET THROUGH A CENTRAL ANGLE OF 06°18'06" TO A POINT OF COMPOUND
CURVE; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE RIGHT,
THE CENTER OF WHICH BEARS SOUTH 21°38'52" EAST HAVING A RADIUS OF
8603.00 FEET, AN ARC DISTANCE OF 204.54 FEET THROUGH A CENTRAL ANGLE OF
O1°21'44" TO A POINT !OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
20°17'08" EAST HAVING A RADIUS OF, 1922.10 FEET, AN ARC DISTANCE OF
178.79 FEET THROUGH A CENTRAL ANGLE OF 05°19'46" TO A POINT OF COMPOUND
CURVE ON THE EAST LINE OF SAID CHARLES BROWNELL DONATION LAND CLAIM NO.
41; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE RIGHT,
THE CENTER OF WHICH BEARS SOUTH 14°57'22" EAST HAVING A RADIUS OF
2814.93 FEET, AN ARC 'DISTANCE OF 659.42 FEET THROUGH A CENTRAL ANGLE OF
13°25'19" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
o
3 OF 3
O1°32'03" EAST HAVING A RADIUS OF 1165.09 FEET, AN ARC DISTANCE OF
1097.05 FEET THROUGH A CENTRAL ANGLE OF 53°57'00" TO A POINT OF
TANGENCY; THENCE CONTINUING ALONG SAID SOUTH LINE SOUTH 37°35'03" EA!
A DISTANCE OF 308.70 FEET TO A POINT OF CURVE; THENCE CONTINUING ALOE
SAID SOUTH LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS
NORTH 52°24'57" EAST HAVING A RADIUS OF 1005.37 FEET, AN ARC DISTANCE
OF 45.82 FEET THROUGH A CENTRAL ANGLE OF 02°36'41" TO A LINE 35 FEET
SOUTHERLY OF AND PARALLEL WITH THE CENTERLINE OF THE EXISTING MOST
SOUTHERLY TRACK OF THE CHICAGO, MILWAUKEE, ST. PAUL 6 PACIFIC RAILROW
TRACKS; THENCE WESTERLY ALONG SAID PARALLEL LINE NORTH 40°11'44" WEST
DISTANCE OF 126.24 FEET TO A POINT OF CURVE ; THENCE CONTINUING ALONG
SAID PARALLEL LINE ON A CURVE TO . THE LEFT, THE CENTER OF WHICH BEARS
, SOUTH 49°48'16" WEST HAVING A RADIUS OF 1829.78 FEET, AN ARC DISTANCE
OF 309.67 FEET THROUGH A CENTRAL ANGLE OF 09°41 '48"; THENCE NORTH'
•49°53'32" WEST ALONG SAID PARALLEL LINE A DISTANCE OF 167.07 FEET TO
POINT OF CURVE; THENCE CONTINUING ALONG SAID PARALLEL LINE ON A CURVE
TO THE LEFT, THE CENTER OF WHICH BEARS SOUTH 40°06'28" WEST HAVING A
RADIUS OF 1102.46 ,FEET, AN ARC DISTANCE OF 807.11 FEET THROUGH A
CENTRAL ANGLE OF 41°56'46" TO A POINT OF COMPOUND CURVE; THENCE
CONTINUING ALONG SAID PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTEI
• OF WHICH BEARS SOUTH O1°50' 18" EAST HAVING A RADIUS OF 2790.19 FEET, •
ARC DISTANCE OF 659.24 FEET THROUGH A CENTRAL ANGLE OF 13°32' 14" TO
THE TRUE POINT OF 'BEGINNING.
•
1 OF 2
•
EXHIBIT 3 TO
AGREEMENT
•
•
PARCEL C: •
THAT PORTION OF TRACT 25, RENTON SHORELANDS 2ND SUPPLEMENTAL; AND
THAT PORTION OF THE SOUTHEAST QUARTER OF SECTION 13, AND THE
SOUTHWEST QUARTER OF SECTION 13, AND THE SOUTHWEST QUARTER
OF SECTION 18, ALL IN TOWNSHIP 23 NORTH, RANGE 4 EAST, W.M.•
IN KING COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS:
BEGINNING AT THE SOUTH QUARTER CORNER OF SAID SECTION 13;
THENCE NORTH 00°58'28" EAST ALONG THE NORTH-SOUTH CENTERLINE
OF SAID SECTION 13, A DISTANCE OF 884.84 FEET TO THE
SOUTHEAST CORNER OF TRACT 26 OF RENTON SHORELANDS SECOND
SUPPLEMENTAL MAPS• 1958, AND THE TRUE POINT OF BEGINNING;
THENCE SOUTH 72°37'52" WEST ALONG THE SOUTH BOUNDARY OF SAID
TRACT 26, A DISTANCE OF 382.60 FEET;
THENCE NORTH 70°54'02" WEST ALONG THE SOUTH BOUNDARY OF SAID
TRACT 26, A DISTANCE OF 73.51 FEET TO. THE EAST LINE OF THE
CHARLES BROWNELL DONATION LAND CLAIM NO. 41 ;
THENCE NORTH O1°24'04" EAST ALONG SAID EAST LINE, A DISTANCE
OF 950.58 FEET TO A LINE 35 FEET SOUTHERLY OF AND PARALLEL
WITH THE CENTERLINE OF THE EXISTING MOST SOUTHERLY TRACK OF
THE CHICAGO, MILWAUKEE, ST. PAUL AND PACIFIC RAILROAD TRACTS;
THENCE ALONG SAID LINE 35 FEET SOUTHERLY OF AND PARALLEL
WITH THE CENTERLINE OF THE MOST SOUTHERLY TRACK, ALONG A
CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
15°22'32" EAST, HAVING A RADIUS OF 2,790.19 FEET, AN ARC
i L
2 OF 2
•1.
° DISTANCE OF 659.24' FEET THROUGH A CENTRAL ANGLE OF 13°32' 14"
TO A POINT OF COMPOUND CURVE;
THENCE ALONG A CURVE TO THE RIGHT• ALONG SAID PARALLEL LINE,
THE CENTER OF WHICH BEARS SOUTH 01°50' 18" EAST HAVING A
RADIUS OF 1,102.46 . FEET, AN ARC DISTANCE OF 807.11 FEET
THROUGH A CENTRAL ANGLE OF 41°56'46"; THENCE SOUTH 49°53'32"
. EAST, ALONG SAID PARALLEL LINE, A DISTANCE OF 167.07 FEET;
THENCE ALONG A CURVE TO THE RIGHT, ALONG SAID PARALLEL LINE, .
1 HAVING A RADIUS OF 1,829.78 FEET, AN ARC DISTANCE OF 309.67
1 FEET THROUGH A CENTRAL ANGLE OF 09°41 '48" ; THENCE
LEAVING SAID PARALLEL LINE, SOUTH 40°11 '44" EAST, A
I
DISTANCE OF .126.24 FEET TO A POINT ON THE SOUTH LINE OF THE
BURLINGTON NORTHERN RAILROAD RIGHT-OF-WAY ;
THENCE ALONG A CURVE TO THE LEFT, ALONG SAID SOUTH LINE, THE
CENTER OF WHICH BEARS NORTH 49°48'16" EAST HAVING A RADIUS
OF 1,005.37 FEET, AN ARC DISTANCE OF 549.02 FEET THROUGH A
CENTRAL ANGLE OF 31°17 '19" TO A POINT OF TANGENT ON SAID •
SOUTH LINE OF THE BURLINGTON NORTHERN RAILROAD RIGHT-OF-WAY;
THENCE CONTINUING ALONG SAID SOUTH LINE, SOUTH 71°29'03"
EAST ALONG A LINE 50 FEET SOUTH OF AND PARALLEL WITH THE
EXISTING SOUTHBOUND' TRACK, A DISTANCE OF 826.56 FEET TO THE
WEST LINE OF SAID SECTION 18;- -THENCE- CONTINUING ALONG SAID
. SOUTH LINE SOUTH 71°29'03" EAST, A DISTANCE 'OF 85.52 FEET TO THE
NORTH LINE OF THE SOUTH 650 FEET OF THE SOUTHWEST QUARTER OF
THE SOUTHWEST QUARTER OF SAID SECTION 18; THENCE NORTH
89°10'25" WEST ALONG THE NORTH LINE OF SAID SOUTHWEST QUARTER
OF THE SOUTHWEST QUARTER OF SECTION 18, A DISTANCE OF 81.57
FEET TO THE EAST LINE OF .THE SOUTHEAST QUARTER OF SAID SECTION
13; THENCE NORTH 88°15 '00" WEST ALONG THE NORTH LINE OF THE
NORTH 650 FEET OF THE SOUTHEAST QUARTER OF SAID SECTION 13,
A DISTANCE OF 2,261:41 FEET TO AN ANGLE POINT ON THE SOUTH
BOUNDARY OF TRACT 25 OF RENTON SHORE LANDS, 1958; THENCE
NORTH 33°07'25" WEST ALONG SAID SOUTH BOUNDARY, A DISTANCE
OF 154.51 FEET TO AN ANGLE POINT; THENCE NORTH 27°21'32"
EAST ALONG SAID SOUTH BOUNDARY, A DISTANCE OF 387.32 FEET
TO AN ANGLE POINT; THENCE NORTH 83°17'25" WEST ALONG SAID SOUTH
BOUNDARY, A DISTANCE OF 171.17 FEET; THENCE SOUTH 46°22'22"
WEST ALONG SAID SOUTH BOUNDARY, A DISTANCE OF 324.66 FEET;
THENCE SOUTH 72°37'52" WEST ALONG SAID SOUTH BOUNDARY, A
DISTANCE OF 76.33 FEET TO THE TRUE POINT OF BEGINNING.
Y
1 OF 2
EXHIBIT 4 TO
AGREEMENT
•
_ ..
The Company has not surveyed the premises described in
The sketch below is furnished without charge solely for the purpose of assisting
in locating said premises and the Company assumes no liability for inaccuracies
therein. It does not purport to show all highways, roads and easements adjoining
or affecting said premises.
I ' Z
D .
0 1
1 61 , v
1 ,
. 01 ,
.. . _ . .
( / . � ;`. 4 .
I `\�0 ,� �aa •
• `ti - ti
L.
.. A
I
. . •
i
I ‘I
" ,i • .
. ; • l .
t4 I 6 i
05
1 �jl 1 �` •
�, -y I
L
4
Zb 1 ` S
i 1 \ a r-
w � I ‘� C • j 4'V ,
, _ a�.�• — — — — -
I
•
i \, • ,;,.,p
: '� '19_ .4..t... ,fs •
2 OF 2
The Company has not surveyed the premises described in Q1.°)30Z_
The sketch below is furnished without charge solely for the purpose of assisting
in locating said premises and the Company assumes no liability for inaccuracies
therein. It does not purport to show all highways, roads and easements adjoining
or affecting said premises. 1
\ N•A-•L N LIME_
\i
• •
••
i . - 1
•
Vi , ,ev . .
•
_ .b
. \ 1; 4 .
0 y -� i ,• ,
ri s tJ' i `J, V 17
Iv
• Ir 1 r
I
j- --- - __ i� I ; A
7cHs rain32!
•
--
a
u • .i
- --1 - - -' - V' _
I
I
. . • .
- i •
I i .4
• b
N
I
I
I
— — A _-. - - .�_ ` _:•.....+.......+.:r:. -_.....n:.:,ti; ""
L .
EXHIBIT 5 TO
AGREEMENT
That portion of the south half of Section 13, Township 23 North, Range 4 East, W.M.
In King County, Washington and of Junction Addition to the City of Seattle, according
to plat recorded in Volume 12 of Plats, page 75, records of said King County, and of
C.E. Brownell 's Donation Claim No. 41 described as follows:
Beginning at the south quarter corner of said Section 13; thence N00°58'28"E along
the north-south centerline thereof 1092.82 feet; thence N68°03 '54"E 224.45 feet to
the TRUE POINT OF BEGINNING; thence S68°03'54"W 575.56 feet; thence N72°04'34"W
389.92 feet; thence S68°O6'46"W 429.32 feet; thence south 85.47 feet to a point of
curve; thence on a to! the left, having a radius of 60.00 feet, thru a central
angle of 126 52 10��, an arc distance of 132.86 feet; thence N53°07'50"E 199.18 feet .
to a point of curve; thence on a curve to the right, having a radius of 200.00 feet
thru a central angle of 53°59'30", an arc distance of 188.47 feet; thence S72°52'40"E
290.00 feet to a point of curve; thence on a curve to the left, having a radius of
197.00feet, thru a centralthencele of N31°27'12"E51", an arc 204.86 feet tothee of TRUE134.60 POINT OFeBEGINNING.
N67°58'29"Et; thence
380.92 feet;
Containing 165,263 square feet or 3.794 acres more or less.
EXHIBIT 6 TO •
AGREEMENT
That portion of the south half of Section 13, Township 23 North, Rarige 4 East, W.M.
in King County, Washington, of Junction Addition to thecCity of s of saidSeattle,
according
to the plat recorded in Volume 12 of Plats, page 75,
and of C.E. Brownell 's Donation Claim No. 41 , described as follows:
Beginning at the south quarter corner of said Section 13; thence N00°58'28"E along
the north-south centerline thereof 1092.82 feet; thence S68°03'54"W 351.11 feet to
the TRUE POINT OF BEGINNING; thence N68°03'54"E 575.56 feet; thence N80°04'48"E
232.00 feet; thence S42°06'08"E 215.00 feet; thence N49°16'27"E 47.54 feet; . thence
N41°23'00"W 158.97 feet to a point of curve; thence on a_curve to the left, having
a radius of 145.00 feet, thru a central angle of 60°38'00", an arc distance of
153.45 feet; thence S77°59'OO"W 207.77 feet to a point of curve; thence on a curve
to tie right, having a radius of 230.00 feet, thru a central angle of 79°13'15",
an arc distance of 318.01 feet; thence S82°15'00"W 457.99 feet; thence S60°16'00"47
28.17 feet; thence
thence51 feet to a S72°04'34"E 43!35 feet which
tobears
the TRUEOPOINT OF
the TRUE POINT OF BEGINNING;
BEGINNING.
Containing 180,421 square feet or 4.142 acres more or less.
•
EXHIBIT 7 TO: •
-
AGREEMENT -
That portion of the southwest quarter of Section 13, Township 23 No'rth, Range 4 East,
W.M. in King County, Washington and that portion of Junction Addition to City of
Seattle, according to plat recorded in Volume 12 of Plats, page 75, records of said
King County, together with vacated streets adjoining which would attach to said
premises by operation of• law, and of C.E. Brownell 's Donation Claim No. 41, described
as follows:. S
Beginning at the south quarter corner of said
Section
the southeast corner of
thence
BTract 26,along
the north-south centerline thereof 884.84 feet to
Renton Shorelands Second Supplemental Maps 1958; thence S72°37'52"14 382.60 feet to
an angle point in the south line of said Tract 26; thence N70°54'02"W 354.53 feet to
. an angle point in the south line of said Tract 26; thence S73°56'01"W 130.08 feet to
an angle point in the south line of said Ti-act 26; thence S41°16'07"W along the south
line of said Tract 26 a distance of 316.18 feet to the north boundary of a tract of
land deeded to King County and described under King County Recording Number 6607786;
thence westerly along said north boundary on a curve to the left, the center which
bears S39°41 '39"W 627.46 feet, thru a central, angle of 39°41 '39"; an arc distance of
434.70 feet; thence north along said north boundary 25.00 feet; thence west along
said north boundary 245.69 feet to the TRUE POINT OF BEGINNING; thence north 156.13
feet; thence N50°39' 19"E 330.21 feet; thence N33°00'54"W 109.47 feet to the southerly
margin of the Burlington Northern Railroad Right-of-Way, said point being a point on
a curve, the center which bears. S39°23'00"E 1853.00 feet; thence°westerly
along
said
southerly margin and curve to the left, thru a central angle of 3 59 19 , an arc
distance of 129.00 feet to a point of compound curve, the center of said curve bears
543°22' 19"E 4030.00 feet; thence westerly along said southerly margin and curve to
the left, thru a central angle of 2°48'32", an arc distance of 197.57 feet to a point
of tangency; thence 543°49'09"W along said south margin 271 .00 feet to a point of
curve; thence on a curve to the right along said southerly margin, having a radius
of 1571.00 feet, thru a central angle of 7°32'02", an arc distance of 206.57 feet to
a point of compound curve, the center which bears N38°38'49"W 727.00 feet; thence
westerly along said southerly margin and curve to the right, thru a central angle of
16°55'35", an arc distance of 214.77 feet to a point of compound curve, the center
which bears N21°43'14"W 1055.00 feet; thence westerly along said southerly margin
and curve to the right, thru a central angle of 11°24'08", an arc distance of 209.95
feet to a point of compound curve; the center which bears N10°19'06"W 696.00 feet;
thence westerly along said southerly margin and curve to the right thru a central of
3°44'25", an arc distance of 45.43 feet to the easterly margin of the Charles Monster
County Road; thence S34°18'31"E along said easterly margin 43.46 feet to the north
boundary of said tract deeded to King County and described under King County Record-
ing Number 6607786; thence N74°13' 19"E along said north boundary 443.31 feet; thence
N59°53'47"E along said north boundary 377.52 feet; thence east along said north
boundary 35.00 feet to the TRUE POINT OF BEGINNING.
Containing 114,401 square feet or 2.626 acres more or less.
EXHIBIT 8 TO
AGREEMENT
- -- - - - -
That portion of the south half of Section 13, Township 23 North, Range 4 East, W.H.
in King County, Washington; and of Junction Addition to the City of Seattle, according
to the plat recorded in Volume 12 of Plats, page 75, records of said King County,
together with vacated streets adjoining which would attach to said premises by opera-
tion of Law; and of C.EBr Manstion 1958Claim descNibedo. lasand of followsracts 25 and 26,
Renton Shore Lands 2nd SupplementalP
Beginning at the south quarter corner of said Section 13; thence N00°58'28"E along the
north-south centerline thereof 1092.82 feet; thence N68°03'54"E 224.45 feet to a point
hereinafter called "Poiot6A46��Wh42Ce326feet'to''the7TRU E POINT OF thence
BEGINNING;�'thence
389.92 feet; thence 568 0 9
south 85.47 feet to a point of curve; thence on a curve to the left, having a radius
of 60.00 feet, thru a central angle of 126°52'l0", an arc distance of 132.86 feet;
thence N53°07'50"E 199.18 feet to a point of curve; thence on a curve to the right,
having a radius of 200.00 feet thru a central angle of 53°59'30", an arc distance of
188.47 feet; thence 572 52 40 E 290.00 feet to a point of curve; thence on a curve to
the left having a radius of 197.00 feet, thru a central angle of 39°08'51", an arc
distance of 134.60 feet; thence N67°58'29"E 380.92 feet;- thence N31°27'12"E.204.86
feet to aforementioned "Point A";thence N80°04'48"E 232.00 feet; thence S42°06'08"E
215.00 feet; thence 531°14'05"W 358.99 feet; thence S47°10'01"E 71 .34 feet; thence
east 114.27 feet; thence south 68.91 feet to the southerly line of said Tract 25;
thence along the southerly line of said Tracts 25 and 26, the following courses and
distances: N88°15'00"W 180.65 feet; N33°07 '25"W 154.51 feet; N27°21 '32"E 387.32
feet; N83°17'25"W 171 .17 feet; S46°22'22"W 324.66 feet; S72°37'52"W 458.93 feet;
N70°54'02"W 354.53 feet; 573°56'O1"W 130.08 feet; and 541°16'07"W 316.18 feet to the
north boundary of a tract of land deeded to King County and described under King
County Receiving Number 6607786; thence westerly along said north boundary on a curve
to the left, the center which bears S39°41 '39"W 627.46 feet thru a central angle of
39°41 '39", an arc distance of 434.70 feet; thence north along said north boundary
25.00 feet; thence west along said north boundary 245.69 feet; thence north 156.13 .
feet; thence N50°39'19"E 330.21 feet; thence 578°41 '24"E 180.00 feet to a point of
curve; thence on a curve to the right, having a radius of 195.01 feet, thru a central
angle of 78°41 '24", an arc distance of 267.83 feet to the TRUE POINT OF BEGINNING.
Containing 382,725 square feet or 8.786 acres more or less.
EXHIBIT 9 TO
"�2 EMENT
1. The portions of the Greenbelt Property and the Flood
Control Property located within Parcel A are subject
to the following:
( i) Rights, reservations, covenants and
restrictions contained in that certain Supplemental
Agreement, recorded as Instrument No . 8012230800 in the
Records of King County, Washington;
(ii) Rights, reservations, covenants and
restrictions contained in that certain Real Estate
Contract recorded , as Instrument No, 8009300609 in the
Records of King County, Washington;
(iii) Easement recorded under Instrument No.
6626569 in the Records of King County, Washington;
(iv) Easement granted to the City of Renton on i'e1' i'ez/
November 14, 1962, under Application No . 27583 ; and
(v) Easement granted- to -King County- Drainage --
District No. 1 on August 11, 1960, under Application No.
25422.
2 . The portion of the Greenbelt Property located within
Parcel B is subject to the following:
(i) Rights, reservations, covenants and
restrictions contained in that certain Real Estate
Contract recorded as Instrument No. 8009300611 in the
Records of King County, Washington; and
(ii) Easement recorded under Instrument No.
6626569 in the Records of King County, Washington.
-
3 . The portions of the Greenbelt Property and the Flood
Control Property located within Parcel C are subject
to the following:
( i) Rights, reservations, covenants and
restrictions contained in that certain Real Estate
Contract recorded as Instrument No. 8002220257 in the
Records of King County, Washington;
(ii) Rights, reservations, covenants and
restrictions contained in that certain Real Estate
Contract recorded as Instrument No . 8004240435 in the
Records of King County, Washington;
09/22/82
7794B 1
A
(iii) Rights, reservations, covenants and
restrictions contained in that certain deed recorded under
Instrument No. 5780049 in the Records of King County,
Washington;
( iv) Easement granted to the City of Renton on
November 14, 1962 , under Application No . 27583 ;
(v) Easement recorded under Instrument No .
8108200425 in the Records of King County, Washington; and
(vi) Easement granted to King County Drainage
District No. 1 on August 11, 1960, under Application No.
25422.
09/22/82
7794B 2
HAGGARD, TOUSLEY & BRAIN
ATTORNEYS AND COUNSELORS AT LAW
RUSSELL F.TOUSLEY 1700 DAON BUILDING
JOEL E.HAGGARD 720 OLIVE WAY
CHRISTOPHER I.BRAIN
SEATTLE,WASHINGTON 98101- TELECOPIER
WILLIAM N.SNELL (206)624-5299 (2061 6246.6959
WILLIAM H. BLOCK
MICHAEL G. FULBRIGHT
KIM D.STEPHENS
November 3, 1982 OUR FILE NO:
15004
Mr . David R. Clemens
Policy Development Director
Policy Development Department CITY OF RENTON
City of Renton
Municipal Building NOV 5 1982
200 Mill Avenue South
Renton, Washington 98055 c F� Pou�T nFPr.
RE: Alterra Rezone Dedication
Dear Mr . Clemens:
Enclosed is a Agreement (the "Agreement" ) which
has been revised in accordance with our letter to you of
October 22, 1982. The enclosed Agreement is marked to
show the changes from the previous Agreement . In addition
ta the matters discussed in our letter to you of October
22, 1982, a couple of additional typographical errors,
which are marked on the enclosed Agreement, were corrected
and the second paragraph on page 1 of the Agreement was •
revised to indicate that Renton Property Associates has
acquired fee ownership of Parcel A. .
Also, with a couple of exceptions, copies of the
items set forth on Exhibit 9 to the Agreement are
enclosed. The exceptions are the easement granted to the .
City of Renton on November 14, 1962 under- Application
No. 27583 and the Easement granted to King County Drainage
District No. 1 on August 11, 1960 under Application
No. 25422 . Apparently, neither of the aforementioned
easements was recorded . I assume you can obtain access to
the easement granted to the City of Renton. AS for the
easement granted to King County Drainage District No. 1,
we are in the process of tracking it down and will forward
a copy .to you as soon:..as, it is available . Its absences
should not be a basis from getting ths 'to 'the Council. '
Mr . David R. Clemens
November 3, 1982
Page 2
If you have any questions, please feel free to
call.
Very truly yours,
HAGGARD, TOUSLEY & BRAIN
‘7,14,./-". :71"411111,447/1
Michael G. Fulbright
MGF/dlb
8950B
Enclosures
cc: Mr. Del Bonds
Ron Neubauer, Esq.
HAGGARD, TOUSLEY & BRAIN
ATTORNEYS AND COUNSELORS AT LAW
RUSSELL F.TOUSLEY 1700 DAON BUILDING
JOEL E.HAGGARD 720 OLIVE WAY
CHRISTOPHER I.BRAIN SEATTLE,WASHINGTON 98101 TELECOPIER
WILLIAM N. SNELL (206)624-5299 (206) 624-8959
WILLIAM H. BLOCK
MICHAEL G. FULBRIGHT
KIM D.STEPHENS
OUR FILE NO:
October 22; 1982
15004
Mr. David R. Clemens CITY OF RENTON
Policy Development Director
Policy Development Department !r; f 2 51982
City of Renton
Municipal Building POLICY
200 Mill Avenue South (DEVELOPMENT DEPT.
Renton; Washington 98055 � k,la Llj
OCT 2 5 1982
RE: Alterra Rezone Dedication
Dear Mr. Clemens :
This letter is in response to your letter to me
of October 15; 1982.
We agree that "in" should be changed to "and" in
the fifth line of the opening paragraph of the draft
Agreement (the "Agreement" ) provided you. Copies of the
items referred to in Exhibit 9 of the Agreement are being
obtained and will be forwarded to you. We do not see a
problem with granting a construction easement across our
clients ' remaining property as long as there are adequate
safeguards for our clients, such as limiting its use to
reasonable times and areas reasonably designated by our
clients and requiring restoration of any damage caused by
such use.
As for your request that the uses of the property
being dedicated be expanded, we believe that the language
contained in the Agreement as drafted is consistent with
the Hearing Examiner ' s report. Expansion of uses by
either of us would not be appropriate. However, if during
the City Council ' s consideration of our rezone request,
they desire to expand the uses along the lines you
indicate; we would not be inclined to oppose it as long as
there are adequate assurances that the expanded uses will
not adversely affect the property retained by our clients.
\r
Mr. David R. Clemens
October 22, 1982
Page 2
In addition; as for your suggestion in limiting
our rights under Section 2. 3 of the Agreement, we are glad
that you believe it appropriate for us to retain the right
to locate utility lines across the property being
dedicated to the City and are not opposed to placing some
reasonable limits on our right to locate those utility
lines. However the language you suggest appears too
broad. A provision providing that our utility lines may
not be located in a manner that would unreasonably
interfere with any existing City lines or lines which the
City has definite plans to install might solve both our
problems.
Finally; your request that the City use our
property for spoil disposal raises entirely new issues
which are beyond the scope of any of the proceedings to
date. We think it is inappropriate to try to now add such
a taking of our property into the Agreement. The
unrestricted dumping of spoil could cause our clients
great hardship. We are not; however; unalterably opposed
to all spoil disposal and believe this can be worked out
in the future. But there should be no delay in adopting
the rezone due to this issue. We think an arrangement
allowing spoil disposals in areas mutually agreeable to
both parties and which meet criteria that ensure against
hardship to our clients can be worked out. It will take
significant technical input to develope appropriate
criteria. We would appreciate your thoughts on this.
We will revise the Agreement in the manner
described above and forward a new copy to you early next
week.
Sincerely yours;
HAGGARD; OUS EY & BRAIN
/
Jo 1 Haggard
JEH/dlb
8602B
October 20, 1982
Office of the Hearings Examiner
City of Renton
200 Mill Ave. South.
Renton, Wa. 98055
I would like a complete transcript of the re-zone
hearing for the Black River Office. Park (Alterra Corporation,
proponent) . The file number is R-129-80. Enclosed is
a check for 43.85 as requested. If you could please in-
clude a written receipt in the packet I would be grateful.
Sincerely yours,(AA eg.{.44,
Albert E. Marshall
40S7, 8th .Ave. NE
Seattle, Wa. 98105
OF R4,,
A
•' z. o THE CITY OF RENTON
U `�
♦i .
Z MUNICIPAL BUILDING 2Q0 MILL AVE. SO. RENTON,WASH.98055
smIL
amm BARBARA' Y. SHINPOCH, MAYOR • LAND USE HEARING EXAMINER
09.0 `O FRED J. KAUFMAN. 235-2593
9,1 TEo s .c' O
October 5, 1982
TO: Don Monaghan, Design Engineering Division
FROM: Fred Kaufman, Hearing Examiner
RE: File No. R-129-80; Alterra Corporation Rezone.
An agreement resulting from a reclassification of certain properties
may result in a contract conveying to the city either an easement or
fee in those properties. The attached legal descriptions purport to
describe those properties . The contract is being reviewed by the
City Attorney's office. Please review the legal descriptions and
prepare a map of same and estimate the number of acres contained
within each area.
Sincerely,
Fred J. fman
Attachments
i r�
OF RA,A
t$ ® ° BUILDING & ZONING DEPARTMENT
z RONALD G. NELSON - DIRECTOR
09 MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
091, SEPT"
BARBARA Y. SHINPOCH MEMORANDUM
MAYOR
DATE: September 30, 1982
TO: Fred J. Kaufman, Land Use Hearing Examiner
FROM: Roger J. Blaylock, Zoning Administrator
SUBJECT: R-129-80/DEDICATION OF P-1 CHANNEL AND GREENBELT
Joel Haggard, representing the Alterra Corporation, has submitted the attached
agreement to comply with the dedications of land as required in Conclusion #6 of the
Hearing Examiner's Report. The issue was raised by Mr. Haggard whether the property
could be deeded to the City without formally subdividing it. I have referred this
problem to the City Attorney.
Please advise whether this agreement fulfills your original intent.
.....) 0 . .. .
- PLANNING AND ZONING- 35A.63.U8U ..
• plan and zoning ordinance, and re- City council's decision to grant • `
zoning is resisted, proponents of rezoning of property from public .
rezoning must demonstrate a use 'to general commercial classi-
change of circumstances to prevail. fication was not arbitrary or ca-
Hayden v: City of Port Townsend pricious,in that decision came after
(1980) 93 Wn 2d 870, 613 P2d 1164. public hearings at which both pro •
-
Preparation and consideration of --ponents and opponents of action
environmental impact statement had input, and thus, no procedural
was not required prior to decision defects existed, and decision.was -
by city council to rezone property based on a request that was not
from public use to general commer- unreasonable even though the ap-
cial classification, in that rezoning plication came within five years of.
carried no specific'building project adoption of the general zoning
in connection with it, council re- scheme,in that designation of city's
tained authority to require an en- downtown for historical preserve-
vironmental evaluation at project tion left insufficient land area
permit stage, an environmental available to accommodate develop- . •
check was submitted to accompany ment contemplated for property,
rezoning application, and a nonim- and thus, test of changed circum- •
pact threshold determination was stances warranting a rezoning was
•
made by city engineer. Hayden v met. Hayden v City of Port Town-
City of Port Townsend (1980) 93 send (1980) 93 Wn 2d 870, 613 P2d
Wn 2d 870, 613 P2d 1164. 1164. - • . .
35A.63.080 Comprehensive plan—Effect. From the date ;
of approval by the legislative body the comprehensive plan, its
parts and modifications thereof, shall serve as a basic source of ,
reference for future legislative and administrative action:- Pro- ,
vided, That the comprehensive plan shall not be construed as a
regulation of property rights'or land uses: ` Provided Further, -
That no procedural irregularity or informality in the considera-
tion, hearing, and development of the comprehensive plan or a
part thereof, or any of its elements, shall affect the validity of
any zoning ordinance or amendment thereto enacted by the ,
code city after the approval of the comprehensive plan:
t -
The comprehensive plan.shall be consulted as a preliminary .
to the establishment, improvement,.abandonment, or vacation of
any street, park, public way, public building, or public structure,
and no dedication of any street or other area for public use shall -
be accepted by the legislative body until the location, character, - •
extent, and effect thereof shall have been considered by the plan-
ning agency with reference to the comprehensive plan. The
legislative body shall specify the time within which the planning -
agency shall report and make a recommendation with respect '
thereto. Recommendations of the planning agency shall be .
advisory only.
Comprehensive zoning plan is Since planning agency reports •
not regulatory but merely suggests and recommendations on proposed
regulatory measures. Barrie v Kit- projects and controls, which must. -
sap County (1980) 93 Wn 2d 843, indicate conformity or nonconform-
613 P2d 1148. - ity with comprehensive plan, are RECEIVED
175 CITY OF" RENT'
• HEARING EXAMINE
J U L 1 31982
- 1Z1.8,9110,11112t1,2131-
% � ; ,,
14
AGREEMENT
This AGREEMENT (this "Agreement" ) is made
this day of ; 1982, by and between
Renton Property Associates, a Washington general
partnership ( "RPA" ) , JAG-Renton Associates, a Washington
general partnership ( "JAG" ) , i the City of Renton, a
Washington municipal corporatiol\ (t(�he "City" ) .
RPA is the owner of a contract vendee' s interest
in that c ai . real property legally described on Exhibit
1 hereto ( "Par e A" ) and that certain real property
legally describes on Exhibit 2 hereto ( "Parcel B" ) . The
owner of the contract vendor ' s interest in both Parcel A
and Parcel B is Richard V. Ogilvie ( "Trustee" ) . as Trustee
pursuant to Order No. 349 issued in Case -No. 77 B 8999 by
the Eastern Division of the United States District Court
for the Northern District of Illinois.
JAG is the owner of a contract vendee' s interest
in that certain real property legally described on Exhibit
3 hereto ( "Parcel C" ) pursuant to that certain Real Estate
Contract recorded as Instrument No. .8004240435 in the
Records of King County, Washington, by and between JAG and
John B. Hansen,. Inc. , a Washington corporation
( "Hansen" ) . Hansen acquired its interest in Parcel C
pursuant to that certain Real Estate Contract recorded as
Instrument No. 8002220254 in the Records of King County,
Washington, by and between Hansen and Trustee in his
capacity as trustee pursuant to Order o. 221 issued in
Case No. 77 B 8999 by the Eastern Division of the United
States District Court for the Northern District of
Illinois.
Alterra Corporation, a Washington corporation
( "Alterra" ) , as agent for RPA and JAG, has requested the
City to rezone Parcel A; Parcel B, and Parcel C
(collectively the "Rezone Property" ) from their present
classification of G-1 to the new classification of M-P
under the City Municipal Code. A general diagram of the
Rezone Property is attached as Exhibit 4 hereto. The
City' s Office of the Land Use Hearing Examiner has ,
recommended changing the zoning classification of the
Rezone Property to the M-P classification upon certain
terms and conditions as set forth in that certain Report
and Recommendation to the Renton City COWleil. ktk
"Report" ) dated July 29, 1982, issued under File No.
R-129-80.
Now, therefore, the parties hereto do hereby
agree as follows:
Section 1. Condition. Pursuant to the Report,
RPA and JAG are required to take certain actions before
the City ordinance on the rezone requested by Alterra, is
heard and decided. The terms and conditions of this
Agreement shall be without prejudice to the City Council's •
• deliberations on said ordinance, but this Agreement and
each and every provision herein are conditioned upon the
\ City' s changing the zoning classification of the Rezone ,Q
Property to M-P subject only to the terms and conditions c die
set forth in the Report. If the City fails to change the 114-tom-J4
zoning classification of the Rezone Property to M-P, this V �
Agreement shall be null and void and none of the parties
hereto shall have any rights hereunder.
Nt -
ci i o iapvc ii
li,i3 P, \vi
UU ccp 27 1982
09/22/82
7792B 1 U PT.
Esl�l4_viiUfiiLv
11,0117 •
Section 2. Easement Grant. The provisions of
this Section 2 are conditioned upon the City' s compliance
with each and every term of this Agreement.
2.1 RPA hereby conveys and quit claims to
the City an easement for greenbelt and open-space purposes
in those portions of that certain real property legally
described on Exhibits 5; 6 and 7 hereto (the "Greenbelt
Property" ) located within Parcel A and Parcel B and an
easement for greenbelt, open-space and flood control
purposes in that portion of that certain real property
described on Exhibit 8 hereto (the "Flood Control
' Property") located within Parcel A. Neither RPA nor the
\� City shall be entitled to locate any structures upon the
• Greenbelt Property. RPA and the City shall each be
entitled to excavate the Flood Control Property for flood
control purposes and locate structures serving flood
control purposes; and no others, upon the Flood Control
Property.
2. 2 JAG hereby conveys and quit claims to
the City an easement for greenbelt and open-space purposes
in those portions of the Greenbelt Property located within
Parcel C and an easement for greenbelt, open-space and ( `'
flood control purposes in that portion of the Flood c�,� � � 701.
Control Property located within Parcel C. Neither JAG nor
€he City shall be entitled to locate any structures upon / A'
�,
the Greenbelt Property. JAG and the City shall each be �� /
entitled to excavate the Flood Control Property for flood /J
control purposes and locate structures serving flood
control purposes, and no others; upon the Flood Control
Property.
2. 3 JAG and RPA each hereby reserve the
right to locate utility lines, including, without
limitation, lines for water, sewer, gas, electric and �11
telephone service, over and across the Greenbelt Property Qf b
and or the Flood Control Property and the right to enter JAAr-< /�
upon said. properties for the purpose of installing, //)/ -
maintaining and relocating such lines, provided that JAG
and or RPA shall make reasonable efforts to restore such creel-/;7
properties to their original° condition after the '
installation of any such utility lines. / 11-
Section 3. Limitation. The easement rights
granted the City herein are granted on a quit claim basis
only and are subject to all rights, covenants,
reservations, and restrictions applicable to the Greenbelt
Property and the Flood Control Property as of the date
hereof, including, without limitation, those matters
described in Exhibit 9 hereto.
Section 4. Fee Title. Provided that the City is
not in breach of any of the terms, and conditions hereof.
at such time or times as the Greenbelt Property and or the
Flood Control Property have been segregated into; separate
legal lots, RPA and or JAG, as appropriate, shall quit
claim the fee title to said properties to the City;
provided that any such conveyances shall (i ) be subject to
all matters described in Section 3 and Exhibit 8 hereof,
( ii ) restrict the City from using the subject property
except as set forth in Section 2 hereof, and ( iii) reserve
the rights set forth in Section 2. 3 hereof, and provided
further that any conveyance of all or part of the Flood
Control Property shall reserve a flood control easement in
the subject property for the grantor, which easement shall
include the right to excavate, locate structures upon and
maintain the subject property for flood control purposes.
09/22/82
7792B 2
Section 5. Development Credit. Notwithstanding
either the easements granted the City under Section 2
hereof or a conveyance to the City pursuant to Section 4
hereof, for purposes of all land use and or building
applications of any kind related to the Rezone Property,
the City and each of its individual departments, offices,
agencies, officers, agents and employees shall (i ) treat
the Rezone Property as if it included the area of the
Greenbelt Property and the Flood Control Property within
its boundaries and (ii) credit the Rezone Property with
the flood storage capacity of the Flood Control Property,
which credit shall include any increase in flood storage
capacity beyond that existing on the date hereof. For
example, without limitation, RPA and or JAG shall receive
credit for the development acreage equivalencies of the
Greenbelt Property and the Flood Control Property and the
flood storage capacity of the Flood Control Property when
developing portions of the Rezone Property other than the
Greenbelt Property and the Flood Control Property.
Notwithstanding anything contained herein to the contrary, /
the City shall not be obligated to allow the construction �c r\'
of more than 995, 781.5 gross square feet upon the Rezone
Property.
Section 6. Joinder. Trustee and Hansen join in
this Agreement for the purpose of subjecting their
interests in the Greenbelt Property and the Flood Control
Property to the terms and conditions contained herein.
Furthermore, as long as Trustee and. or Hansen retain an
interest in the Greenbelt Property. and or the Flood
Control Property, they each agree to join in any future
conveyances pursuant to Section 4 hereof. The provisions
of this Section 6 shall be binding upon the successors and
assigns of Trustee and or Hansen.
Section 7. Miscellaneous.
7.1 The captions of this Agreement are for
convenience only and shall not be considered or referred
to in resolving questions of interpretation or
construction.
7.2 Each and all of the provisions of this
Agreement shall be binding upon and inure to the benefit
of each of the parties hereto, and their heirs, successors
and assigns.
IN WITNESS WHEREOF, the undersigned have entered . . . .
into this Agreement as of the date hereinabove first
mentioned.
CITY:
CITY OF RENTON,
a Washington municipal corporation
By
By
09/22/82
7792B 3
RPA:
RENTON PROPERTY ASSOCIATES,
a Washington general partnership
By
By
JAG:
JAG-RENTON ASSOCIATES,
a Washington general partnership
By
Ronald G. Neubauer
General Partner
By
Delton J. Bonds
General Partner
By
Kenneth L. Thompson
General Partner
By
Merton Cohen
General Partner
TRUSTEE:
Richard B. Ogilvie, Trustee
•
09/22/82
7792B 4
HANSEN:
JOHN B. HANSEN, INC.
a Washington corporation
-By
By
STATE OF WASHINGTON )
) ss.
COUNTY OF KING )
On this day personally appeared before me
and
; to me known to be
the and
respectively; of the City of Renton, the municipal
corporation that executed the within and foregoing
instrument, and acknowledged the said instrument to be the
free and voluntary act and deed of said corporation for
the uses and purposes therein mentioned, and on oath
stated that he was authorized to execute said instrument,
and that the seal affixed is the corporate seal of said
corporation.
Given under my hand and official seal this
day of , 1982.
Notary Public in and for the
State of Washington, residing '
at
09/22/82
7792E 5
STATE OF WASHINGTON )
) ss.
COUNTY OF KING )
On this day personally appeared before me
and
, to me known to be
the and
respectively, of Renton Property Associates, the
partnership that executed the within and foregoing
instrument, and acknowledged the said instrument to be the
free and voluntary act and deed of said corporation for
the uses and purposes therein mentioned, and on oath
stated that he was authorized to execute said instrument.
Given under my hand and official seal this
day of , 1982.
Notary Public in and for the
State of Washington, residing
at •
STATE OF WASHINGTON )
ss.
COUNTY OF KING )
On this day personally appeared before me Ronald
G. Neubauer, to me known to be a General Partner, of
JAG-RENTON ASSOCIATES, the partnership that executed the
within and foregoing instrument, and acknowledged the said
instrument to be the free and voluntary act and deed of
said corporation for the uses and purposes therein
mentioned, and on oath stated that he was authorized to
execute said instrument.
Given under my hand and official seal this
day of , 1982.
Notary Public in and for the
State of Washington, residing
at •
09/22/82
7792E 6
-
STATE OF WASHINGTON )
) ss.
COUNTY OF KING )
On this day personally appeared before me Delton
J. Bonds, to me known to be a General Partner, of
JAG-RENTON ASSOCIATES, the partnership that executed the
within and foregoing instrument, and acknowledged the said
instrument to be the free and voluntary act and deed of
said corporation for the uses and purposes therein
mentioned, and on oath stated that he was authorized to
execute said instrument.
Given under my hand and official seal this
day of , 1982.
Notary Public in and for the
State of Washington, residing
at
STATE OF WASHINGTON )
) ss.
COUNTY OF KING )
On this day personally appeared before me Kenneth
L. Thompson, to me known to be a General Partner, of
JAG-RENTON ASSOCIATES, the partnership that executed the
within and foregoing instrument, and acknowledged the said
instrument to be, the free and voluntary act and deed of
said corporation for the uses and purposes therein
mentioned, and on oath stated that he was authorized to
execute said instrument.
Given under my hand and official seal this
day of , 1982.
Notary Public in and for the
State of Washington, residing
at
09/22/82
7792B 7
STATE OF WASHINGTON )
) ss.
COUNTY OF KING )
On this day personally appeared before me Merton
Cohen, to me known to be a General Partner, of JAG-RENTON
ASSOCIATES, the partnership that executed the within and
foregoing instrument, and acknowledged the said instrument
to be the free and voluntary act and deed of said
corporation for the uses and purposes therein mentioned,
and on oath stated that he was authorized to execute said
instrument.
Given under my hand and official seal this
day of , 1982.
Notary Public in and for the
State of Washington, residing
at •
STATE OF WASHINGTON )
ss.
COUNTY OF KING )
On this day personally appeared before me Richard
V. Ogilvie, to me known to be the individual described in
and who executed the within and foregoing instrument, and
acknowledged that he signed the same as his free and
voluntary act and deed, for the uses and purposes therein
mentioned.
Given under my hand and official seal this
day of , 1982.
Notary Public in and for the
State of Washington, residing
at - •
09/22/82
7792B 8
/1
STATE OF WASHINGTON )
) ss.
COUNTY OF KING )
On this day personally appeared before me
and
to me known to be
the and
respectively, of JOHN B. HANSEN, INC. , the corporation
that executed the within and foregoing instrument, and
acknowledged the said instrument to be the free and
voluntary act and deed of said corporation for the uses
and purposes therein mentioned, and on oath stated that he
was authorized to execute said instrument, and that the
seal affixed is the corporate seal of said corporation.
Given under, my hand and official seal this
day of , 1982.
Notary Public in and for the
State of Washington, residing
at
09/22/82
7792B 9
•
1 OF 2
EXHIBIT 1 TO •
AGREEMENT •
•
•
PARCEL A;
•
• THAT PORTION OF THE SOUTHWEST QUARTER OF SECTION 13, TOWNSHIP 23
• NORTH, RANGE 4EAST, W.H., IN KING COUNTY, WASHINGTON; AND
THAT PORTION OF. JUNCTION ADDITION TO CITY OF SEATTLE, ACCORDING TO TI
PLAT RECORDED IN VOLUME 12 OF PLATS, PAGE 75v IN KING COUNTY, •
WASHINGTON, TOGETHER WITH VACATED STREETS ADJOINING WHICH WOULD ATTAI
TO SAID PREMISES BY OPERATION OF LAW, AND OF C. E. BROWNELL'S DONATII
CLAIM ND. 41- AND OF THAT PORTION OF TRACT 26v RENTON SHORE LANDS 2ND
SUPPLEMENTAL, DESCRIBED AS FOLLOWS:
•
BEGINNING AT THE SOUTH QUARTER CORNER OF SAID SECTION 13; THENCE NOR1
00°58'28I EAST. ALONG THE NORTH-SOUTH CENTERLINE OF SAID SECTION 13 A
DISTANCE OF 884.84 FEET TO THE SOUTHEAST CORNER OF TRACT 26 OF RENTOt
SHORELANOS SECOND SUPPLEMENTAL MAPS, 1958; THENCE SOUTH 72°37'5261 WE!
ALONG THE SOUTH BOUNDARY OF SAID TRACT 26 A DISTANCE OF 382.60 FEET;
THENCE NORTH 70°54'02" WEST ALONG SAID SOUTH BOUNDARY OF TRACT 26 A
DISTANCE. OF. 73.50 FEET TO THE EAST LINE OF THE CHARLES BROWNELL
DONATION LAND CLAIM NO. 41 AND THE TRUE POINT OF BEGINNING; THENCE
CONTINUING NORTH 70°54'02" WEST ALONG SAID-SOUTH -BOUNDARY OF TRACT 2E
DISTANCE OF 281.02 FEET; THENCE SOUTH 73°56'01" WEST ALONG SAID SOUTH
BOUNDARY OF TRACT 26 A DISTANCE OF 130.08 FEET; THENCE SOUTH 41°16'01
WEST ALONG SAID SOUTH BOUNDARY OF TRACT 26 A DISTANCE OF 316.18 FEET
THE NORTH BOUNDARY OF A TRACT OF LAND DEEDED TO KING COUNTY AND
DESCRIBED UNDER KING COUNTY AUDITOR'S FILE NO. 6607786; THENCE
WESTERLY ALONG SAID NORTH BOUNDARY ON A CURVE TO THE LEFT, THE CENTER
OF WHICH BEARS SOUTH 39°41'39" WEST HAVING A RADIUS OF 627.46 FEET AN
ARC DISTANCE OF 434.70 FEET THROUGH A .CENTRAL ANGLE OF 39°41'39";
THENCE NORTH A DISTANCE OF 25.00 FEET ALONG SAID NORTH BOUNDARY;
THENCE WEST A DISTANCE OF 280.69 FEET 'ALONG SAID NORTH BOUNDARY;
THENCE SOUTH 59°53'47" WEST ALONG SAID NORTH BOUNDARY A DISTANCE OF
377.52 FEET; THENCE SOUTH 74°13'19" WEST ALONG SAID NORTH BOUNDARY A
DISTANCE OF 443.31 FEET TO THE NORTHERLY MARGIN OF THE CHARLES HONSTE
COUNTY ROAD; THENCE NORTH 34°18'31" WEST ALONG SAID NORTHERLY MARGIN
• DISTANCE OF 43.46 FEET TO THE SOUTH LINE OF THE BURLINGTON NORTHERN
RAILROAD RIGHT-OF-WAY; THENCE ALONG A CURVE TO THE LEFT, ALONG SAID.
SOUTH LINE, THE CENTER OF WHICH BEARS NORTH 06°34'41" WEST HAVING A
RADIUS OF 696.00 FEET• AN ARC DISTANCE OF. 45.43 FEET THROUGH A CENTRAL
ANGLE OF 03°44'25" TO A POINT OF COMPOUND CURVE; THENCE ALONG A CURVE
TO THE LEFT, ALONG SAID SOUTH LINE,, THE CENTER OF WHICH BEARS NORTH
10°19'06" WEST HAVING A RADIUS OF 1,055.00 FEET, AN ARC DISTANCE OF
• 209.95 FEET THROUGH A CENTRAL ANGLE OF 11°24'08" TO A POINT OF COMPOUI
CURVE; THENCE ALONG A CURVE TO THE LEFT, ALONG SAID SOUTH LINE, THE
CENTER OF WHICH BEARS NORTH 21°43°14" WEST HAVING. A RADIUS OF 727.00
FEET, AN ARC DISTANCE OF 214.77 FEET THROUGH. A CENTRAL ANGLE OF
16°551'35" TO A POINT OF COMPOUND CURVE; THENCE ALONG A CURVE TO THE
LEFT, ALONG SAID SOUTH LINE, THE CENTER OF WHICH BEARS NORTH 38°38'49'
9
2 OF 2 •
WEST HAVING A RADIUS, OF 1,571.00 FEET, AN ARC DISTANCE OF 206.57 FEEL
THROUGH A CENTRAL ANGLE OF 07°32.02" TO A POINT OF TANGENCY; THENCE
NORTH 43°49.09" EAST ALONG SAID SOUTH LINE A DISTANCE OF 97.17 FEET TO
ALINE 35 FEET SOUTHERLY OF AND PARALLEL WITH THE CENTERLINE OF THE
EXISTING MOST SOUTHERLY TRACK OF THE CHICAGO, MILWAUKEE, ST. PAUL AZ
PACIFIC RAILROAD TRACKS; THENCE ALONG SAID PARALLEL LINE ON A CURVE TO
THE RIGHT, THE CENTER OF WHICH BEARS SOUTH 42°43618" EAST HAVING A
RADIUS OF 696.89 FEET° AN ARC DISTANCE OF 40.09 FEET THROUGH A CENTRAL
ANGLE OF 03°17'45"; THENCE NORTH 50°34'27" EAST ALONG SAID PARALLEL
LINE A DISTANCE OF 248.50 FEET; THENCE ALONG SAID PARALLEL LINE ON A
CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH 39°25.33" EAST
HAVING A RADIUS OF 676.58 FEET, AN ARC DISTANCE OF 93.64 FEET THROWN A
CENTAL ANGLE OF 07°55'47" TO A POINT OF REVERSE CURVE; THENCE ALONG
SAID PARALLEL LINE ON A CURVE TO THE LEFT, THE' CENTER OF WHICH BEARS
NORTH 31°29'46" WEST 'HAVING A RADIUS OF 428.64 FEET, AN ARC• DISTANCE OF
73.32 FEET THROUGH A CENTRAL ANGLE OF. 09°48 .04" TO A POINT OF REVERSE ,
CURVE; "THENCE ALONG SAID PARALLEL LINE ON A CURVE TO THE RIGHT, THE
CENTER OF WHICH. BEARS SOUTH 41°17.50" EAST HAVING A RADIUS OF 2,580.74
FEET, AN ARC DISTANCE OF 437.40 FEET THROUGH A CENTRAL ANGLE OF
09°42°39" TO A POINT ' OF: COMPOUND CURVE; THENCE ALONG SAID PARALLEL LINE
ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS .SOUTH 31°35'11"
EAST HAVING A RADIUS OF 2,790.19 FEET, AN ARC" DISTANCE OF 789.44 FEET
THROUGH A CENTRAL ANGLE OF 16°12.39" TO THE EAST LINE OF THE CHARLES
BROWNELL DONATION LAND CLAIM NO. 41; THENCE SOUTH 01°24.04" WEST ALaiG
SAID EAST LINE A DISTANCE OF 950.58 FEET TO THE TRUE POINT OF
BEGINNING.
•
•
1 OF 3
•
EXHIBIT 2 TO '
• AGREEMENT . •
•
•
•
PARCEL B: •
-- -
•
THAT PORTION OF Co E. BROWNELL'S DONATION CLAIM NO. 41, AND OF THE
SOUTHWEST QUARTER AND THE SOUTHEAST QUARTER OF SECTION 13, TOWNSHIP a
NORTH, RANGE 4 EAST, U.M.• IN KING COUNTY, WASHINGTON, DESCRIBED AS
FOLLOWS:
•
BEGINNING AT THE SOUTH QUARTER CORNER 'OF SAID SECTION 13; THENCE NORT1
00°58'28" EAST ALONG THE NORTH—SOUTH CENTERLINE OF SAID SECTION 13 A
DISTANCE OF 884.84 FEET TO THE SOUTHEAST CORNER OF TRACT 26 OF RENTER
SHORELANDS SECOND SUPPLEMENTAL MAPS, 1958; THENCE SOUTH 72°37'52" WES1 ALONG THE SOUTH BOUNDARY OF SAID TRACT 26 A DISTANCE OF 382.60 'FEET; ,
THENCE NORTH 70654'02u WEST. ALONG SAID SOUTH BOUNDARY OF TRACT 26 A
DISTANCE OF 73.50 FEET TO. THE EAST LINE -OF THE CHARLES BROWNELL
DONATION LAND CLAIM ND. 41; THENCE NORTH. 01°24'04" EAST ALONG SAID
. EAST LINE OF THE CHARLES BROWNELL DONATION LAND CLAIM NO. 41 A DISTARC
OF 950.58 FEET TO A LINE 35 FEET SOUTHERLY OF AND PARALLEL WITH THE
CENTERLINE OF THE .EXISTING MOST SOUTHERLY TRACK OF. THE CHICAGO,
MILWAUKEE• ST. PAUL 6 PACIFIC RAILROAD TRACKS AND THE TRUE POINT OF
BEGINNING; THENCE WESTERLY ALONG SAID PARALLEL LINE ON A CURVE TO TIE
LEFT, THE CENTER OF WHICH BEARS SOUTH 15622°32" EAST HAVING. A RADIUS 9i
2790.19 FEET, AN ARC DISTANCE OF 789.44 FEET THROUGH A CENTRAL ANGLE Di
16°12°39" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
• 2 OF 3
•
PARALLEL LINE .ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS SOUTH
31°35'11" EAST HAVING A RADIUS OF 2580.74 FEET, AN ARC DISTANCE OF
437.40 FEET THROUGH A CENTRAL ANGLE OF 09°42'39" TO. A POINT OF -REVERSI
CURVE; THENCE CONTINUING ALONG SAID PARALLEL LINE ON A CURVE TO THE
RIGHT, THE CENTER' OF WHICH BEARS NORTH 41°17650". WEST HAVING A RADIUS
OF 428.64 FEET, AN ARC DISTANCE OF 73.32 : FEET THROUGH• A CENTRAL ANGLE
OF 09°48'04" TO. A POINT OF REVERSE CURVE; THENCE CONTINUING ALONG SAII
PARALLEL LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS SOUTH
31°29'46" EAST HAVING A RADIUS OF 676.58 : FEET, AN ARC DISTANCE OF 93.0
FEET THROUGH A CENTRAL ANGLE OF 07°55'47" TO A POINT OF TANGENCY;.
THENCE CONTINUING ALONG' SAID PARALLEL 'LINE SOUTH 50°34'27" WEST A
DISTANCE OF 248..50 FEET TO A POINT OF CURVE; THENCE CONTINUING ALONG
SAID PARALLEL LINE oN A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS .
SOUTH 39°25'33" EAST HAVING A RADIUS, OF 696.89 FEET, AN ARC DISTANCE C
40.09 FEET THROUGH A CENTRAL ANGLE 00 03°17°45" TO THE SOUTH LINE OF
THE BURLINGTON NORTHERN RAILROAD RIGHT-OF-4AY; THENCE NORTH 43°49'09"
EAST ALONG SAID SOUTH LINE A DISTANCE OF , 173.83 FEET TO A POINT OF
CURVE; THENCE -CONTINUING. ,ALONG SAID SOUTH LINE ON..A CURVE TO THE
RIGHT, THE CENTER OF WHICH BEARS SOUTH 46°10'51" EAST HAVING A RADIUS
OF 4030.00; FEET, AN ARC .DISTANCE OF 197.57 FEET THROUGH A CENTRAL ANGL
' OF 02°48'32" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAI
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
43°22'19" EAST HAVING A RADIUS- OF 1853.00 FEET, AN : ARC DISTANCE OF
194.75 FEET THROUGH A CENTRAL; 'ANGLE OF 06°01' 18" TO A POINT OF COMPOUN
CURVE; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE RIGHT
THE CENTER OF WHICH BEARS SOUTH 37°21'01" EAST HAVING A RADIUS OF
10543.00 FEET, AN ARC DISTANCE OF 186.51 FEET THROUGH A CENTRAL ANGLE
OF 01°00'49" TO A POINT OF COMPOUND CURVE;-- THENCE CONTINUING ALONG SAII
SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
36°20'12" EAST HAVING A RADIUS OF 1657.00: FEET AN ARC DISTANCE OF
193.93 FEET THROUGH A CENTRAL ANGLE OF 06°42'20" TOA . POINT OF COMPOUNI
CURVE; THENCE CONTINUING ALONG SAID SOUTH: LINE ON A CURVE TO THE RIGHT,
THE CENTER OF WHICH' BEARS SOUTH 29°37'52".` EAST HAVING A RADIUS OF
6738.00 FEET, AN ARC DISTANCE OF 197.76 FEET. THROUGH A CENTRAL ANGLE 01
O1°40'54" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
SOUTH LINE :ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
27°56'58" EAST HAVING A RADIUS OF 1768.00 FEET, AN ARC DISTANCE OF
194.45 FEET THROUGH A CENTRAL ANGLE OF 06°18106" TO A POINT OF COMPOUNI
CURVE; THENCE CONTINUING ALONG SAID SOUTH LINE ON A CURVE TO THE RIGHTI
THE CENTER , OF WHICH BEARS SOUTH 21°38'52" EAST HAVING A RADIUS OF
8603.00 FEET, AN ARC DISTANCE OF 204.54 FEET THROUGH A CENTRAL ANGLE OF
01°21'44" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
SOUTH LINE ;ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
20°17'08" EAST HAVING A RADIUS OF 1922.10 'FEET, AN ARC DISTANCE OF
178.79 FEET. THR000H A CENTRAL ANGLE OF 05°19'46" TO A POINT OF COMPOUND
CURVE ON THE EAST LINE OF SAID CHARLES BRONNELL DONATION LAND CLAIM NO.
41; THENCE CONTINUING ALONG SAID SOUTH LI'NE .ON A CURVE TO THE RIGHT,
THE CENTER OF WHICH BEARS SOUTH 14°57'22" EAST HAVING A RADIUS OF
2814.93 FEET, AN ARC DISTANCE OF 659.42 FEET THROUGH A CENTRAL ANGLE OF
13°25'19" TO A POINT OF COMPOUND CURVE; THENCE CONTINUING ALONG SAID
. SOUTH LINE ON A CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
^�►Y ''f':; :6i1'6`v 2�`rt'�3'�744'l'&`j6aC'F'+"'r .
• 3 OF 3
01°32'03° EAST HAVING A RADIUS OF 1165.09 FEET, AN ARC DISTANCE OF
1097.05 FEET THROUGH A CENTRAL ANGLE OF 53°57'00" TO A POINT OF
TANGENCY; THENCE, CONTINUING ALONG SAID SOUTH LINE SOUTH 37°35'03" EA
A DISTANCE OF -368.70 FEET TO A POINT OF CURVE; THENCE CONTINUING AID
SAID SOUTH LINE ON A CURVE TO THE LEFT, THE CENTER OF WHICH BEARS
NORTH 52°24'57° EAST HAVING A RADIUS OF 1005.37 FEET9 AN ARC DISTANCI
• OF 45.82 fEET THROUGH A CENTRAL ANGLE OF 02°36.41" TO A LINE 35 FEET
SOUTHERLY OF AND PARALLEL WITH THE CENTERLINE OF THE EXISTING MOST
SOUTHERLY TRACK OF 'THE CHICAGO, MILWAUKEE• ST. PAUL 6 PACIFIC RAILRO(
TRACKS; THENCE WESTERLY ALONG SAID PARALLEL LINE NORTH 40°11'44" WEST
DISTANCE OF 126.24 FEET TO A POINT OF CURVE; THENCE CONTINUING ALONG
SAID PARALLEL LINE ,ON A CURVE TO THE LEFTS THE CENTER OF WHICH BEARS
, SOUTH 49°48'16" WEST HAVING A RADIUS OF 1829.78 FEET, AN ARC DISTANCE
OF 309.67 FEET THROUGH A CENTRAL ANGLE OF 09°41 '48"; THENCE NORTH'
49°53'32" WEST ALONG SAID PARALLEL LINE A DISTANCE OF 167.07 FEET TO
POINT OF CURVE; THENCE CONTINUING ALONG SAID PARALLEL LINE ON A CURVE
TO THE LEFT, THE CENTER OF WHICH BEARS SOUTH 40°06'28" WEST HAVING A
RADIUS OF 1102.46 FEET, AN ARC DISTANCE OF 807.11 FEET THROUGH A
CENTRAL ANGLE OF 41°56'46" TO A POINT OF COMPOUND CURVE; THENCE
CONTINUING ALONG SAID PARALLEL LINE ON A CURVE TO -THE LEFTS THE CENTS
• OF WHICH BEARS SOUTH O1°50'18" EAST HAVING A RADIUS OF 2790.19 FEET,
ARC DISTANCE OF 659.24 FEET THROUGH A CENTRAL ANGLE OF 13°32' 14" TO
THE TRUE POINT OF BEGINNING.
•
•
•
I OF 2 •
•
•
•
EXHIBIT 3 TO •
AGREEMENT
•
•
•
PARCEL C:
THAT PORTION OF TRACT 25, RENTON SHORELANDS 2ND SUPPLEMENTAL; AND
•
THAT PORTION OF- THE SOUTHEAST QUARTER OF SECTION 13, AND THE
SOUTHWEST QUARTER OF SECTION 139 AND THE SOUTHWEST QUARTER
OF SECTION189 ALL IN TOWNSHIP 23 NORTH, RANGE 4 EAST, W.M.9
IN KING COUNTY, WASHINGTON, DESCRIBED' AS FOLLOWS:
BEGINNING AT THE SOUTH QUARTER CORNER OF SAID SECTION 13;
THENCE NORTH 00°58'28" EAST ALONG THE NORTH-SOUTH CENTERLINE
OF SAID SECTION 139 A DISTANCE' OF 884.84 FEET TO THE
SOUTHEAST CORNER OF TRACT 26 OF RENTON SHORELANDS SECOND
SUPPLEMENTAL MAPS, 1958, AND' THE TRUE POINT OF BEGINNING;
THENCE SOUTH 72°37'52" WEST ALONG THE ,SOUTH BOUNDARY OF SAID
TRACT 269 A DISTANCE OF 382.60 FEET;
• THENCE NORTH 70°54'02" WEST ALONG THE SOUTH BOUNDARY OF SAID
TRACT 26, A DISTANCE OF 73.51. FEET TO. ,THE EAST LINE OF THE
CHARLES BROWNELL DONATION LAND CLAIM NO: 41; • •
THENCE NORTH O1°24'04" EAST ALONG SAID EAST LINE, A DISTANCE
OF 950.58 FEET TO A LINE 35 FEET SOUTHERLY OF AND PARALLEL •
WITH THE CENTERLINE OF THE EXISTING MOST SOUTHERLY TRACK OF
• THE CHICAGO, MILWAUKEE, ST. PAUL AND PACIFIC RAILROAD TRACTS;
THENCE ALONG SAID LINE 35 FEET SOUTHERLY OF AND . PARALLEL
WITH THE CENTERLINE OF THE MOST SOUTHERLY TRACK, ALONG A
CURVE TO THE RIGHT, THE CENTER OF WHICH BEARS SOUTH
15°22'32" EAST, HAVING A RADIUS OF '2,790.19 FEET, AN ARC
. - .
•
2 OF 2
•
•
-- -- _� - -
DISTANCE OF 659.24 FEET THROUGH A CENTRAL ANGLE OF 13°32' 14"
' TO A POINT OF COMPOUND CURVE;
THENCE ALONG A CURVE. TO THE RIGHT, ALONG SAID PARALLEL LINE,
THE CENTER OF WHICH BEARS SOUTH 01°50'18" EAST HAVING. A
RADIUS OF 1,102.46 FEE:T,, AN ARC -DISTANCE OF 807.11 FEET
, THROUGH A CENTRAL ANGLE OF 41°56'46"; THENCE SOUTH 49°53°32"
EAST, ALONG SAID PARALLEL LINE, A DISTANCE OF 167.07 FEET;
THENCE ALONG A CURVE TO THE RIGHT, ALONG SAID •PARALLEL LINE, .
HAVING A RADIUS OF 1,829.78 FEET, AN ARC DISTANCE OF 309.67
FEET THROUGH A CENTRAL ANGLE OF 09°41°48" ; THENCE
LEAVING SAID PARALLEL LINE, SOUTH 40°11 '44" EAST, A
DISTANCE OF .126.24 FEET TO A., POINT ON THE SOUTH LINE OF THE
BURLINGTON NORTHERN RAILROAD RIGHT-OF-WAY; .
THENCE ALONG A CURVE TO THE LEFT, ALONG SAID SOUTH LINE, THE
CENTER OF WHICH BEARS NORTH 49°48°16" EAST HAVING A RADIUS
OF 1,005.37 FEET,_ AN ARC DISTANCE OF 549.02 FEET THROUGH A
CENTRAL ANGLE OF 31°17'19" TO A POINT OF TANGENT ON SAID •
• SOUTH LINE OF THE. BURLINGTON NORTHERN RAILROAD RIGHT-OF-WAY;
THENCE CONTINUING ALONG SAID SOUTH LINE, SOUTH 71°29'03"
EAST ALONG A LINE. 50FEET SOUTH OF AND PARALLEL WITH .THE
_ EXISTING SOUTHBOUND -TRACK, ..A. DISTANCE OF 826.56 FEET TO THE
WEST LINE OF SAID SECTION 18; THENCE CONTINUING ALONG SAID
• , SOUTH LINE SOUTH 71`O29'03" EAST, A DISTANCE-OF 85.52 FEET TO THE
NORTH LINE: OF THE SOUTH 650 FEET OF THE SOUTHWEST QUARTER OF
• THE SOUTHWEST QUARTER OF SAID SECTION 18; THENCE NORTH
89°10°25" WEST ALONG THE NORTH LINE OF SAID •SOUTHWEST QUARTER
OF THE SOUTHWEST QUARTER OF SECTION 18, A DISTANCE OF 81.57
FEET TO THE EAST LINE OF .THE SOUTHEAST QUARTER OF SAID SECTION
. 13; THENCE NORTH 88°15'00" WEST ALONG THE NORTH LINE OF THE
NORTH 650 FEET OF THE SOUTHEAST QUARTER OF SAID SECTION 13,
A DISTANCE . OF 2,261.41 FEET TO AN ANGLE POINT ON THE SOUTH
BOUNDARY OF TRACT 25 OF RENTON SHORE LANDS, 1958; THENCE
NORTH 33°07°25" WEST ALONG SAID SOUTH BOUNDARY, A DISTANCE
OF 154.51 FEET TO AN ANGLE POINT; THENCE NORTH 27°21°32" •
EAST ALONG SAID SOUTH BOUNDARY, A DISTANCE OF 387.32 FEET
TO AN ANGLE POINT; THENCE NORTH 83°17°25" WEST ALONG SAID SOUTH
BOUNDARY, A DISTANCE OF 171.17 FEET; THENCE SOUTH 46°22°22"
WEST ALONG SAID SOUTH BOUNDARY, A DISTANCE OF 324.66 FEET;
THENCE SOUTH 72°37'52" WEST ALONG SAID SOUTH BOUNDARY, A
DISTANCE OF 76.33 FEET TO THE TRUE POINT OF -BEGINNING.
4 N 4:72 ,:�..,-:- - 1 OF 2
s:, ,.
yy ,
i.Ki•.U-•}}}}}�����.,, Sri.:-+... %
-stPt' Qr i.'
EXHIBIT 4 TO
AGREEMENT
•
The Company has not surveyed the premises described in k2.1==677._3
The sketch below is furnished without charge solely for the purpose of assisting
in locating said premises and the Company assumes no liability for inaccuracies
therein. It does not purport to show all highways, roads and easements adjoining
or affecting said premises.
•.
•1 1
gi Z �
D
I G r -- 1 --
-- - - - -
O . r 1
o 61 .
. � i '`
t
/1(,r1,-;1 ' y0
•
0 4,E.‘ A
y
e
„0 A \1).
I . )kr % 444, ‘
91 4, ' . •
I 1 \ - ( '
•
• • �� `
I
I 1 f e .
.
W . I t• . i, 9 -
s I • 1 �% 6
I 1 g
•
aaa.cn• _ _ _ _ _• _ _
• ••
2 OF 2
7
S
1
The Company has not surveyed the premises described in 11.2naoZ—
The sketch below is furnished without charge solely for the purpose of assisting
in locating said premises and the Company assumes no liability for inaccuracies
therein. It does not purport to show all highways. roads and easements adjoining
or affecting said premises. 1 \ .
) g I 5.
NQ 1 . \ to•ATCAN Like_ _ _ _
,
I • -
V n
/ � atils raicr�! J _
Z.
I a
I • 1'r
I . • L •
•
1 •
I
•
•
1 f
•
o - _.-• -
•
•
. EXHIBIT 5 TO
• AGREEMENT '
•
•
That portion of the south half of Section 13. Township 23 North, Range 4 East, W.M.
In King County; Washington and of;.Junction Addition to the City of Seattle, according
to plat recorded in Volume 12 of Plats, page 75, records of said King County, and of
C.E. Brownell's Donation Claim No: 41 described as follows:
Beginning at the south quarter corner of said Section 13; thence NOO°58'28"E along
the north-south centerline thereof 1092.82 feet; thence N68°03'54"E 224.45 feet to
the TRUE POINT 'OF BEGINNING; . thence S68°03'54"W 575.56 feet; thence N72°04'34"W
389.92 feet; thence S68°06'46'Wd 429.32 feet; thence south 85.47 feet to a point of
curve; thence on a curve to the left, having a radius of 60.00 feet, thru a central
angle of 126°52'10", an arc distance of 132.86 feet; thence N53°07'50"E 199.18 feet .
to a point of curve; thence on a curve to the right, having a radius of 200.00 feet
thru a central angle of 53°59'30". an arc distance of 188.47 feet; thence S72°52'40"E
• 290.00 feet to a point of curve; thence on a curve to the left, having a radius of -
197.00 feet, thru a central angle,of 39°08'51", an arc distance of 134.60 feet; thence
N67°58'29"E 380.92 feet; thence N31°27'12"E 204.86 feet to the TRUE POINT OF BEGINNING
Containing 165,263 square feet or 3.794 acres more or less.
•
EXHIBIT .6 TO •
AGREEMENT
That portion of the south half of Section 13, Township 23 North, .Radge 4 East, W.M.
in King County, Washington, of Junction Addition to the City of Seattle, according
to the plat recorded in Volume 12 of Plats, page 75, records of said King County,
and of C.E. Brownell 's Donation Claim No. 41, described as follows:
•
Beginning at the south quarter corner of said, Section 13; thence NOO°58'28"E along
. the north-south centerline thereof 1092.82 feet; thence S68'03'54"W 351.11 feet to
•
the TRUE POINT OF BEGINNING; thence N68°03°54"E 575.56 feet; thence N80°04'48"E
232.00 feet; thence 542°06'O8"E 215.00 feet; thence 1449°16'27"E 47.54 feet; thence
N41'23100"W 158.97 feet to a point of curve; thence on a_curve to the left, having
a radius of 145.00 feet, thru a central angle of 60°38'00", an arc distance of
153.45 feet; thence S77°59'OO"W 207.77 feet to a point of curve; thence on a cUrve
to the right,. having a radius of 230.00 feet, thru a central angle of 79°13'15",
an arc distance of 318.01 feet; thence S82°15'00"W 457.99 feet; thence S60'16'00"W
28.17 feet; thence S34°20'00"E 357.51 feet to a point which bears N72°04'34'QW from
the TRUE POINT OF BEGINNING; thence S72°04'34"E 43.35 feet to the TRUE POINT OF
BEGINNING. •
Containing 180,421 square feet or 4.142 acres more or less.
•
EXHIBIT 7 TO: ,
- AGREEMENT
That portion of the southwest quarter of Section 13. Township 23 Noith, Range 4 East,
W.M. in King County, Washington and that portion of Junction Addition to City of
Seattle. according to plat recorded in Volume 12 of Plats, page 75. records of said
King County. together with vacated streets adjoining which would attach to said
premises by operation of. law, and of C.E. Brownell 's. Donation Claim No. 41, described
as follows:, -
Beginning at the south quarter corner of
feet to the southeast coner of Tract 26,
said
Section
thence
rBalong
the north-south centerline thereof 884.
Renton Shorelands Second Supplemental Maps 1958; thence 572°37'52"W 382.60 feet to
an angle point in the south line of said Tract 26; thence N70°54'02"W 354.53 feet to
• an angle point in the south line of said Tract 26; thence S73°56'O1"W 130.08 feet to
.an angle point in the south line of said Tract 26; thence 541'16'07"W along the south
line of said Tract 26 a distance of 316.18 feet to the north boundary of a tract of
land deeded to King County and described under King County Recording Number 6607786;
thence westerly along said north boundary on a curve to the left, the
arc distance er whichhc of
bears 539'41 '39"W 627.46 feet, thru a central, angle of 39 41 39
"; an434.70 feet; thence north along said north boundary 25.00 feet; thence west along
said north boundary 245.69 feet to the TRUE POINT OF BEGINNING; thence north 156.13
feet; thence N50°39'.19"E 330.21 feet; thence N33"00'54"W 109.47 feet to the southerly
margin of the Burlington Northern Railroad Right-of- Jay, said point being a point on
a curve, the center which bears. S39°23'00"E 1853.00 feet; thence westerly along said
southerly margin and curve to the left, thru a central angle of 3°59'19". an arc
distance of 129.00 feet to a point of compound curve, the center of said curve bears
543'22'19"E 4030.00 feet; .thence westerly along said southerly margin and curve to
the left, thru a central angle of 2'48'32". an arc distance of 197.57 feet to a point
of tangency; thence S43°49'09"W along said south margin 271.00 feet to a point of
curve; thence on a curve to the right along said southerly margin, having a radius
of 1571.00 feet, thru a central angle of 7°32'O2", an arc distance of 206.57 feet to
a point of compound curve. the center which bears N38°.38'49"W 727.00 feet; thence
westerly along said southerly margin and curve to the right, thru a central angle of
16'55'35", an arc distance of 214.77 feet to a point of compound curve, the center
which bears N21°43'14"W 1055.00 feet; thence westerly along said southerly margin
and curve to the right, thru a central angle of 11°24'08", an arc distance of 209.95
feet to a point of compound curve; the center which bears N10°19'06"W 696.00 feet;
thence westerly along said southerly margin and curve to the right thru a central of
3'44'25", an arc distance of 45.43 feet to the easterly margin of the Charles Monster
County Road; thence S34°18'31"E along said easterly margin 43.46 feet to the north
boundary of said tract deeded to King County and described under King County Record-
ing Number 6607786; thence N74°13'19"E along said north boundary 443.31 feet; thence
N59°53'47"E along said north boundary 377.52 feet; thence east along said north
boundary 35.00 feet to the TRUE POINT OF BEGINNING.
Containing 114,401 square feet or 2.626 acres more or less.
•
•
•
•
EXHIBIT' 8 TO
AGREEMENT
•
•
•
•
. -- --= - . - . _-_ . __. .
That portion of the south half. of Section 13, Township 23 North, Range 4 East, W.M.
In King County, Washington; and of Junction Addition to the City of Seattle, according
• to the plat recorded in Volume. 12 of Plats, page 75, records of said King County,
together with vacated streets adjoining which would attach to said premises by opera-
tion of Law; and of C.E. Brownell 's Donation Claim No. 41 , and of Tracts 25 and 26,
Renton Shore Lands 2nd Supplemental Maps 1958, described as follows:
Beginning at the south quarter corner of said Section 13; thence NOO°58'28"E along the
eg 9
north-south centerline thereof 1092.82 feet; thence N68°03'54"E 224.45 feet to a point
hereinafter called "Point A"; thence 568°03'54"W 575.56 feet; thence N72°04'34"W .
389.92 feet; thence S68°06'46"W 429.32 feet to the TRUE POINT OF BEGINNING; thence .
. south 85.47 feet to a point of curve; thence on a curve to the left, having a radius
of 60.00 feet, thru a central angle of 126°52'10". an arc distance of 132.86 feet;
thence N53°07'50"E 199.18 feet to a point of curve; thence on a curve to the right,
having a radius of 200.00 feet.thru a central angle of 53°59'30", an arc distance of •
188.47 feet; thence S72°52'40"E 290.00 feet to a point of curve; thence on a curve to
the left having a radius of 197.00 feet. thru a central angle of 39°08;51", an arc
distance of 134.60 feet;-thence N67°58'29"E-380.92 feet;_thence N31°27'12"E-204.86 ---.-.
feet to aforementioned "Point A"; thence N80°04'48"E 232.00 feet; thence S42°06'08"E
215.00 feet; thence S31'14'05"W.358.99 feet; thence 547°10'O1"E 71.34 feet; thence
east 114.27 feet; thence south 68.91 feet to the southerly line of said Tract 25; .
thence along the southerly line of said Tracts 25 and 26, the following courses and
distances: N88°15'00"W 180.65 feet; N33°07'25"W 154.51 feet; N27°21 '32'-'E.387.32
_ feet; N83'17'25"W 171.17 feet; S46°22'22"W 324.66 feet; 572°37'52"W 458.93 feet;
N70°54'02"W 354.53. feet; 573°56'01"W 130.08 feet; and S41°16'07"W 316.18 feet to the
north boundary of a tract of land deeded to King County and described under King
County Receiving Number 6607786; thence westerly along said north boundary on a curve
to the left, the center which bears 539°41 '39"W 627.46 feet thru a central angle of
39'41'39". an arc distance of 434.70 feet; thence north along said north boundary
25.00 feet; thence west along said north boundary 245.69 feet; thence north 156.13 .
feet; thence N50°39'19"E 330.21 feet; thence 578°41 '24"E 180.00 feet to a point of
curve; thence on a curve to the right, having a radius of 195.01 feet, thru a central
angle of 78°41 '24", an arc distance of 267.83 feet to the TRUE POINT OF BEGINNING.
Containing 382,725 square feet or 8.786 acres more or less.
. `
EXIBIT 9 TO
AGREEMENT
1. The portions, of the Greenbelt Property and the Flood
Control Property located within Parcel A are subject
to the following:
(i ) Rights, reservations, covenants and
restrictions contained in that certain Supplemental
Agreement, recorded as Instrument No. 8012230800 in the
Records of King County, Washington;
(ii) Rights, reservations, covenants and
restrictions contained in that certain Real Estate
Contract recorded as. Instrument No, 8009300609 in the
Records of King County, Washington;
(iii) Easement recorded under Instrument No.
6626569 in the Records of King County, Washington;
(iv) Rights, reservations; covenants and
restrictions contained in that certain deed recorded under
Instrument No. 27583 in the Records of King County,
' Washington; and
.(v) _Easement granted to_King_Co.unty Drainage
District No. 1 on August 11, 1960, under Application No.
25422.
2. The portion of the Greenbelt Property located within
Parcel B is subject to the following:
(i) Rights, reservations, covenants and
restrictions contained in that certain Real Estate
Contract recorded as Instrument No. 8009300611 in the
Records of King County, Washington; and
(ii ) Easement recorded under Instrument No.
6626569 in the Records of King County, Washington.
3. The portions of the Greenbelt Property and the Flood
Control Property located within Parcel C are subject
to the following:
(i ) Rights, reservations, covenants and
restrictions contained in that certain Real Estate
Contract recorded as Instrument No. 8002220257 in the
Records of King County, Washington;
(ii ) Rights, reservations, covenants and
restrictions contained in that certain Real Estate
Contract recorded as Instrument No. 8004240435 in the
Records of King County, Washington;
09/22/82
7794B 1
(iii ) Rights, reservations, covenants and
restrictions contained in that certain deed recorded under
Instrument No. 5780049 in the Records of King County,
Washington;
(iv) Easement granted to the City of Renton on
November 14; 1962; under Application No. 27583;
(v) Easement recorded under Instrument No.
8108200425 in the Records of King County, Washington; and
(vi ) Easement granted to King County Drainage
District No. 1 on August 11, 1960, under Application No.
25422.
09/22/82
7794B 2
'HAGGARD, TOUSLEY &. BRAIN
ATTORNEYS AND COUNSELORS AT LAW
RUSSELL F.TOUSLEY 1700 DAON BUILDING
JOEL E.HAGGARD 720 OLIVE WAY
CHRISTOPHER I.BRAIN SEATTLE,WASHINGTON 98101
T ELECOPIER
WILLIAM N. SNELL (206)624-5299 (206) 624-8959
WILLIAM H. BLOCK
MICHAEL G. FULBRIGHT
KIM D.STEPHENS
OUR FILE NO:
August 10, 1982
RCal OF UNION N15 0 0 4
I
FIJ• r( F11 Cal ; jMr . Roger Blaylock � �
City of Renton AUG 10 1982
Renton City Hall
Renton, Washington BUILD;NG/ZONIiNG DE PT.
Dear Roger:
We have received legal descriptions for the
various parcels in the Black River Office Park rezone
which would be donated or transferred to the City of Ren-
ton. The property is basically divided as we understand
it into two lots which will necessitate 1) a splitting of
the donations with respect to the existing lot lines, and
2) acquiring signatures from all parties of interest. We
are maintaining a high priority on obtaining this infor-
mation and will be communicating with you as it develops
and a draft of the deeds are prepared. It may be such
that we will be able to submit a draft of the deed without
identifying all of the parties of interest to you to
facilitate your review with respect to the terms and con-
ditions of the deeds.
Sincerely yours,
HAGG , USL Y & BRAIN
J 1 Haggard
JEH/lg
6805B
cc: Mr. Del Bonds
'ENDING
OF FILE
FILE TITLE el4finidetiv
k 8D
Revised
Black River Office Park
Final EIS
0* 7
March 29, 1982
soa;"
.R7,7
ci,e4
4k4.424*'
•
•
FINAL
ENVIRONMENTAL IMPACT STATEMENT
FOR
BLACK RIVER OFFICE PARK
PREPARED FOR THE
CITY OF RENTON -
PLANNING DEPARTMENT
RENTON, WASHINGTON
BY
R. W. THORPE AND ASSOCIATES
Prepared in Compliance With
The State Environmental Policy Act of 1971
Chapter 43.21C, Revised Code of Washington, as amended
SEPA Guidelines, Effective January 16, 1976 CITY OF RENTON
Chapter 197-10, Washington Administrative Code, as revised
MAR n 1982
POLICY
DEVELOPMENT nFP!.
TABLE OF CONTENTS Page number
INTRODUCTION . .
DISTRIBUTION LIST iv
LOCATION MAP vi
VICINITY MAP vii
CONCEPTUAL SITE PLAN viii
PREFACE ix
SUMMARY x
COMMENT LETTERS
Written Comments from Governmental Agencies and
Response to Comments
1. United States Department of the Army 1
2. United States Department of Agriculture,
Soil Conservation Service 7
3. United States Department of the Interior 12
4. Washington State Department of Ecology 15
5. Washington State Department of Fisheries 17
6. Washington State Department.of Game 21
7. Washington State Department of Transportation 24
8. Municipality of Metropolitan Seattle 31
9. Puget Sound Air Pollution Control Agency 34
10. King County Department of Planning and
Community Development 36
11. City of Renton Fire Marshall 48
12. City of Renton Police Department 50
Written Comments from Neighborhood Residents, Community Groups j
and other Interested Private Parties and Responses to Comments I
- I
1. Seattle.Audubon Society 54,
2. Green River Study Group 58
3. Alhadeff, Leavitt, Wesley & Bopp 61.
4. Lauri Johnsen 65
Letters Not.Requiring Response
1. Washington State Office of Archaeology and.
Historic Preservation 70
2. Seattle/King County Department of Public Health 71
3. Seattle/King County Commuter Pool 26
4. City of Seattle Department of Construction .
and Land Use 72
APPENDICES
A. Black River Office Park Water Quality Impact Assessment
B. Black River Office Park Rezone Traffic Analysis
C. Correspondence from the Renton Public Works Director
D. Black River Office Park Drainage Analysis Supplement
-i-
INTRODUCTION ,
Project Sponsor
Alterra Corporation
2120-A S.W. 152nd Street
P.O. Box 66101
Seattle, WA 98116
Nature of the Proposal
The proponent is requesting a rezone of 71.16 acres from General
Classification (G) to Manufacturing Park (MP) in order to con-
struct in two phases an office park and rail-served warehouse uses.
Project Location
The site of the proposed rezone is a 71.16 acre parcel of land
located approximately one mile west of the Renton central business
district. The site is bounded on the north by the Burlington-North-
ern Railroad right-of-way, on the east by the proposed Earlington
Woods Planned Unit Development, on the south by the Earlington Golf
Course (proposed to be developed into an industrial park) and on the
west by Monster Road and the P-I pumping station.
Lead Agency
City of Renton Planning Department
Responsible Official
David Clemens, Acting Planning Director
Planning Department
City of Renton
Contact Person
David Clemens, Acting Planning Director
City of Renton Planning Department
Municipal Building
200 Mill Avenue South
Renton, WA 98055
Tel: (206) 235-2551
Date of Issue of Draft EIS: April 24, 1981
Date of Issue of Final EIS:
Cost of the Document:
-ii-
Authors and Principal Contributors
This EIS was prepared under the direction of the City of Renton
Planning Department; research and analyses were provided by the
following firms:
R. W. Thorpe & Associates Entranco Engineers
815 Seattle Tower Hydrology
3rd & University 1515-116th Avenue N.E.
Seattle, WA 98101 Bellevue, WA 98004
(206) 624-6239 (Contact: David Morency)
(Contact: Deborah Krouse)
Rittenhouse-Zeman & Associates, Inc.
Geotechnical Engineering
13837 N.E. 8th Street
Bellevue, WA 98005
(Contact: Craig LaVielle)
The TRANSPO Group
Traffic and Circulation
23-148th Avenue S.E.
Bellevue, WA 98007
(Contact: David Markley)
Present Actions, Permits and Licenses Required
Rezone
This EIS involves a request for a rezone only. If and when specific
development plans are proposed in the future, the following permits
may be required as well as additional individual supplemental environ-
ment analysis pursuant to WAC 197-10-660.
Street Use Permits
Preliminary Plat Approval Electrical Permits
Shoreline Management Substantial Occupancy Permits
Development Permit Sign Permits
Flood Control Permit Fisheries Permits
Final Plat Approval All other permits necessary
Site Plan Approval to construct the buildings
Grading Permit and improvements proposed on
Hydraulics Permit the site.
Building Permits
Mechanical Permit
Location of EIS Background Data
R. W. Thorpe & Associates Renton Planning Department
815 Seattle Tower City of Renton
3rd & University Municipal Building
Seattle, WA 98101 200 Mill Avenue South
Renton, WA 98005
-iii-
•
RECIPIENTS OF THIS FINAL ENVIRONMENTAL IMPACT STATEMENT
Federal
Environmental Protection Agency
Department of Housing and Urban Development
Department of Energy
Army Corps of Engineers, Seattle District
Soils Conservation Service, Department of Agriculture
Department of Interior, Fish and Wildlife
State
Governor's Office
Office of Program Planning and Fiscal Management
Department of Ecology
Department of Fisheries
Department of Game
Department of Transportation
Department of Social and Health Services
Ecological Commission
Office of Archaeology and Historic Preservation
Office of Public Archaeology, University of Washington
Regional
Metro- Water Quality Division
Metro- Transit
Puget Sound Air Pollution Control Agency
Puget Sound Council of Governments
Seattle - King County Department of Public Health
Local Government
King County Department of Public Works, Hydraulics Division
King County Building and Land Development Division
King County Planning and Community Development Division
King County Soil and Water Conservation District
City of Kent Department of Community Development
City of Tukwila Department of Community Development
City of Seattle Department of Construction and Land Use
City of Renton
Mayor •
City Council
Hearing Examiner's Office
Planning Commission
Public Works Department
Parks and Recreation Department
Police Department
Fire Department
City Attorney
SEPA Information Center
Planning Department
-iv-
RECIPIENTS, continued.
Utilities/Services
• Renton School District #403
Puget Sound Power and Light Company
Washington Natural Gas Company
Pacific Northwest Bell
Libraries
Renton Public Library
University of Washington Library, College of Architecture and
Urban Planning
King County Public Library
Newspapers
Seattle Times
Seattle Post-Intelligencer
Daily Journal of Commerce
Renton Record Chronicle
Private Organizations and Others
Seattle Audubon Society
Greater Seattle Chamber of Commerce
Rainier Audubon Society
East Lake Washington Audubon Society
Green River Study Group
Alhadeff, Leavitt, Wesley and Bopp
Lauri Johnsen
Muckleshoot Tribal Chairman
Duwamish Indian Tribe
-v-
M; ---- •
tJ:
„a` 3,
•
1
J
__41 ''''.;:-.--,2-..;;?•, :‘•:,•:, )!;••••,:•,,..•••.,,,,,,:„:„, •...
i „Nf II
4A
MI •
'5M-?••• --:'4 1 BELLEVUE /
SH
'` �•�y' -` ���j A .L LAKE
•;.ry
MMAMI
l
1 •
I I 1 9
•
ttp)... 4 *
''...:.‘• ••••••,":V..•':.:•,•,':!,?.,M.!•.:,:c: ... • /.,;:,.. 4
14 C
1 i
•
•
,
;� , W AI •,:;,,,.--
UKILA 405 ® �E �760 .
,..,::1 ,I.'::',.';',.
.LAKE_
_. 1 -`','-i.;':,,•:}.a,,'.,:.-.::,f;;.,::•::::;.1-x..:.;w;0.::;,4,,k
•
YOUNGS
;'•::''•,'.:'.!:.•''•:.4'':.•••;1:::5:-i,.1-...-';1',::::1:,- , .:*,:' ,,i,iN.,
�:.�":::,=.:- .". , MAPLE
\ sf*7 s
"�. = ""':;:
,/> ALLEY
•
ID
=` ' '; BLACK .®
TI . ...„.„,
,„‘„, °;;% < ^$ ®A• UBURN.. DIAMOND
•
.70 FIFE
�i ;k:44..._� Ate® A,
•
•
•
• . .
•
•
, i .
1 LOCATION MAP
BLACK RIVE
` ` • OFFICE_ A
NOPT1-9 R. W. THORPE S. -ASSOCI^TES 1
•
•
r i 4.
1
cf "R .tr ▪ '``.5:.4i .i.•: I_t.".` ) F'-^.rrrn 1.1 .il • • :.. .I!I �"+4` VC -
,i.:....$'!...:,..:,,,7.i ,•'•!;--,!--;:•-:,--•.,.-::•,,,,..---,•;::;.•;•.:-..--.••••,,..,.••,:::-..',::.,:•,;-;:•,•:::Ax•-..-__ . (... -,, ,:,t.".1. :..i.:, .-,.... ... ........-... . ...:,.. :, ..,J111;,....,,‘,...:::::.6 . . . • ..- i- el tl 0 ..,..
•
•I,`;• iL.�l
+F.'}�ai� _i4 .L AI )�' /' ±i1.r • : •�• - ,..- '7 ® '"` N
..f;..� L•:II '!„; J::'rh? n'c.,y - i , , ,A ''I- '�•I. ' :1 - f1 •�r., I!/
1 `', , !ri ;'� ?: . :r. C'. Q
ri
_I{';irr..�,1.f1 ^r:•�.i. p71- �„�O-''j1`11'�` •�-`.ar•, er-7 �.• r„( r'�igi `�. •• I .s" .''
}f;;.,1 ' �'ii• n•,,.fit;:� y. I`. "V h �1 '[1 d a'• {• •ti' ) ` r'i _ - 3 -
•
. .: 4 Lii,„ 8 . :
-z'�Y; r.'Y., .`: .f..:;° "€r• -'' 0 ,1••; t • • (r`:J '•1 i I)
,, :%•:, -", �.,, + �' {:•. \ •. III
,:t :.;.. . • 3 1• { it
,; Alt; ,'' ¢t,• . Q ;. , • `f •
�I to
j; �^Jtfi,e ,i,t':.'“,,; ,",'•. • i';;0 0' rill 1.-.i U.,t.il 0 � ,;'-,. • '' )1 II a7
•
•
fØ
', \`;%r`tl; fY tit.• 1'! \ v_.-„ •
,. .t'. 7, LL"l)r 7`�..:^.�t �7/r,. ;t' i,• ',t.t•••�•• '� ! cn
•
:i�''?�$'; _;5i° j%k' j.' �;•tii:,�tl▪•�. ?�:,:.:Q_J.6 .\....-.- -}"r'r;:. k/ -—--,(:. ••••••] ..,--..-.,:::,:-z ..:..,:::,-....7.: '' -1' t t-r 4 '
•\\
'i '' . r",:f CC .\ III
•;?r'.:;Y•{'.,t f;,+ .�;t^••�':7(fir. • -. `• ,'7 'j ,�.r. O,� •
I .. :1,...:,.
:."'W . \ I i • - . - .
irr•'its Y.�•.. ::,r;:•�-c IN,':, J , .• ---•--�1 _ . I
, , . ... :.,.:.....
•
•
41
:..;;::off';; ,' <. ,;::. o.. f
fir;.. `3; / /,: 0 I/ I
III . €" dr yea: a1111 p�3 _� Li
,: :.1 ; 0 I c+) [� 0 • 4i�`� i" 7 c, h, v/\ *;;jriIj(/4'( frf z• �� m; , ti,'.Qill� _a I v, {cp.{;.r7 :t•`J� l c \ _ I �
•
: ='.;. it �. ,a;�__ • ::._.._Jv. r 0 •
r' • `'. ).p
L:�,1. 1\ )\,.."..\:,.-.......v.......'
`;. F 1 t,f.•1. 'rq • =� u= Y_ }_I �» �,I o ID
Q—i F
;it `�Ifikiii'.y,.1 \ \.q .trsr �" • - ./ I •Mr6'•"w: F ',s(, i``^ �, -"' AA',_. �•
,4,, !A''7li•r'j. � \ t •t�:lt>. ' :� a;l ' r 1 ,(rs^'. r" A. -�• • ('•• vet^` �{ • (n
11 �• 4, \.:. r10 \. (�l��._ .��,//-Y: 1 C :•.4 •r • d ,..'�`��`�`f • 1 r�1111
I'lyl1-fr.,41'
`\t \)/.,• per �,. .1, ''•` y•: `lam._...`' "-.:.�'„f• :� �� r1"'.'F ' II , Cr
. . .:.
7 b•,' fQ ( !f1 `Y`•i 1-}'r�\F`j}( '. I % [ICI •
, ,r T -
/.' ,a\\ • �T,r' .: ` r-` ��Is
17 .. l 1 ( j ' / :'\ n :..... • =G'f -_-•
( - -ryy--}} ! '▪ ' 'T ,t;l'C M• .t f I�� t.a -„1 ..—. _j4(1.1...A...0.,....fr. :�� 4,_ y} —�
un
_`"t,- ' `r -!' 4 1`f ti-• f=: .•i.:: 'I!"Z'`^.`_ V: 1,_ a.-�?s; •.z�.,-''i� w - •='''; __ .
1I i fir' 1 7 , .fi;fr' — I ,7,: R:''`''' :`-_: .,�.- MI it74"6:.,
e-
I. .v —i )'J')ric .;;:',t l • ,f/ /i' �� ^� '��; '` F 3V F .( .6 i "I C�
r _ \`_ - .-.2 — 5 ;c I n
•
(I h £ 3a'..t;J;i.,%xC 1 • Cw! {{ is II
i-� _ i 1 i `,. 'l 1� `� !4 I!t:' If'"e� �'� ry
•
•
!
, . - , •
, , , . . -; ' . ; • ' - ' -
, . , • I ' .
• . . _ , 1 . ' . 'F..,-.., - - - --- •-. -
•
V7'‘:...*7 • ' .
.....,:
.:•;'.',.'-'' ' . ' .
•
',?.; :;•• ' ,;'T • ,
. . .
no 'A
air ,
•
.i........-,
RIVER
,,,,„,:, , •
. ..
(„..„, . ..,
•
4c-y.:, .
t,!;'...:. - ' , , ' .
. . OFFICE .PARK
,,:•,„
PHASE A 38 i PHASE 1 33ACreS R.W.THORPE AND ASSOCIATES;',',„ • .- . e- •
- _ _ ----r------ .,_. , .• - -
..A. ..
• .
, ,•., _._ .._ 3 , in 7
I - ,
- w-- .- 6 0----
800 NORTH
• eip
,----11..- -...<' _ .1:3 li :j I -.C.U 4;••..- \‘... - .
ify,ri i •,—. . INA ;_tSJIh._
f'',:•. . : /) &a.11-1P1P 4,1 4611..1 i ri I. eta fil i
F.-,'..• . •
.7<lAW 01' se ;it %,; •nr—„ 1 --..i° °ea k
-i,:.'.',.' . /4,4. e.:••• \ - . - 6-1 L.4 -•040• ... 67
•
,,•!,,,:: . . ....,,,ir'..c3, Vi - 0.ia IraI •\oil III 104 114
:t::J,. ..4) 0 . a; *k c :1 .er"' 4,$/ We ' -•-•.' *II '',...
FT.,:,,,.',• ,' iarf". . ...-,#,
co?. sipeo 0 0741:e.:- fig°ill
:,;,,,• .,._ .
jt.'""' " 0"' e .0 . a--:. •- :.1.11L T.j • _.•t.. . .„„, .,
R:.',I . • ..40e; 0#6'160 erlii,er —'t'0.-°--:'' E' ' V 4 eeii . .00.0% wi, ' , 111.%:1 • WA1,.cr _ __ .
,•'< . - Arri 000 0•00.,,,a0 ki,1./// g
E \ii+1#074S0T10.0A0dot illarissiilf,:- teem 1,41441 ..,
eri:..f•:,,,,:•%:t':1'::.:',-
-.:-•:•,;.,I',.::•'r ,
..-) - • ,,,, .- -.___---._--..--„---—...„_-A-.r—t-nicc,,,rAN.,o,,RtKiE.
..
I A . 1SW.7111 An5.
P[A < D
iVE
LO. P._._-M NTu „ —
0 NORTH•
alTh
, M
\ . •
';-.,'. 9 VI - •
. ,
• .
f1:1:';' • I W . .
.''''''''' 33 C • • . ' '
. .
. .
;•: .', Pk„,% . .
...„,,. 1 . •
. .
01 • . .
• .
'-i- '• • > . .
. .
.,.: • .
. .
-.:Th M M • .
- :•;, 0 . . .
01 . .
,--.'.-- —
•
'•:!:.' )1 r . . . -
,
., . 1
ni 7 )) . .-.- •
• . , .
to 2 ••, . • • . . : . .•
:;',.,;.:•:
._ . ____ .....
.c.,
. .
•;v -.. .
. .
..•:., . •
- . . , • .
PREFACE
This document, together with the Draft Environmental Impact
Statement issued July 10, 1981, is the Final EIS for the
proposed Black River Office Park Rezone.
The Draft EIS is not reprinted herein.
This EIS has been prepared pursuant to WAC 197-10-580(2) .
ix
SUMMARY
OF THE PROPOSAL
I . The Proposed Action
The project sponsor proposes to rezone a 71.16 acre site from General
Classification (G) to Manufacturing Park (MP) designation in order to
construct, in 2 phases, an office park and rail served warehousing.
Future environmental consequences of specific on-site development will
be addressed in more detail in future environmental documents.
Off-site improvements may be required to serve this proposal , or this
proposal in conjunction with other developments anticipated in the
future in this area. These include improvements to the. P-1 drainage
channel (see other Governmental Services, p. 86 of the DEIS) , and con-
struction of the Valley Parkway.
II. Impacts and Mitigating Measures
A. PHYSICAL ENVIRONMENT
1. Earth •
a. Geology and Soils
Impacts
Import of fill and reposition and cover of topsoils due to
excavation and filling activities.
Mitigating Measures
Excavation and grading operations on the site will be performed in
conformance with the City of Renton Mining, Excavation and Grading
Ordinance
b. Topography
Impacts
Topography will be modified in order to create buildings and road
sites.
Mitigating Measures
Topographic changes could be restricted to limited areas of the
site.
-x-
c. Unique Physical Features
Impacts
Development of the proposal will necessitate removal of 38.6 acres
of the 59.5 acre riparian forest located on the site.
Mitigating Measures
- Existing vegetation will be preserved on significant portions
of the site.
- A master landscape plan will be prepared to ensure good design
practice and preservation of as much of the riparian vegetation
as possible.
- As many of the existing trees as possible should be retained
through maintenance of greenbelt areas in order that large
groups of trees and understory remain undisturbed.
- The Black River Channel will be protected by a 50 to 100 foot
setback from the top of the bank.
2. Air
Impacts
There will be a short-term increase in dust and fumes during
construction. Over the long-term, automobile-related pollutants
will increase as local traffic levels increase.
Mitigating Measures
- Low emission construction equipment will be used whenever
possible.
- Measures to control construction dust, such as watering,
cleaning and sweeping of streets at the end of hauling
activities should be performed by the contractor.
3. Water
a. Surface Water Quantity/Quality
Impacts
Increased surface runoff from the site as well as increased levels
of polluted surface runoff would result from the proposed action.
Alteration of runoff characteristics will occur in that diversion
of stormflow into ditches and storm pipes will prevent water from
flowing to low lying areas and may cause some drying up of wetlands
that will be preserved on site, unless storm drainage measures are
undertaken to protect them.
-xi-
Mitigating Measures
- Temporary detention and settling ponds should be utilized
during construction of foundations to collect silt and minimize
turbidity.
- Stormwater runoff will be collected in a storm sewer system
approved by the Renton Public Works Department.
- Oil/water separators should . be utilized to remove petroleum
products from storm water.
• - Adequate street and parking area cleaning and maintenance of
the stormwater system should be provided.
- Catch basins and screens should be included in the stormwater
system to collect litter and debris.
- No development will occur within a 50 foot setback from the top
of the bank of the Black River Channel .
b. Floods .
Impacts
Fill material will be utilized to bring building sites above the
100 year flood: elevations.
Mitigating Measures
- Fill material will be required to bring some building sites
above the 100 year flood plain which will prevent on-site
flooding.
- Some areas could be left unfilled which may reduce the amounts
of flood storage displacement that occurs on the site.
c. Groundwater Quantity/Movement
Impacts
Project development would result in an increase of impervious
surface on the site, , which would decrease the amount of
infiltration of precipitation.
Mitigating Measures
A reduction in building site coverage could require less filling.
-xii-
4. Flora
Impacts
Approximately 84% of the site consists of a unique wetland
deciduous forest, a part of the largest forest of this type in the
Seattle area. As a result of the proposed action about 78% of this
riparian forest would be removed and be replaced by building
foundations, roads and parking areas.
Mitigating Measures
- As many of the existing trees as possible should be retained
through maintenance of green belt areas in order that large
groups of trees and understory remain undisturbed.
- A master landscape plan will be prepared to assure good design
practice and preservation of as much of the riparian vegetation
as possible.
- Placement of building sites, parking lots and roads should be
based on tree inventories provided by field surveys.
- Vegetation along the Black River Channel should be preserved
and maintained by the proponent.
5. Fauna
Impacts
Removal of most wildlife habitat and reduction in most native
wildlife due to intrusion of human activity.
Mitigating Measures
- Landscaping materials that provide food sources for birds and
small animals should be utilized.
- As much natural vegetation should be retained as possible.
- Surface water quality along Black River I should be
preserved by planting natural riparian vegetation along the
drainage-way banks and maintaining wetlands wherever possible.
Xiii-
6. Noise
Impacts (Short-Term)
Noise levels will increase considerably during construction
activities with frequent noise peaks depending on the type of
equipment used. Traffic noise will increase on adjacent streets.
Mitigating Measures
- Noisy operations should be scheduled so that they are not
concurrent.
- Phased development should be planned which would reduce the
size of movements of construction noise.
- Construction equipment should be operated only between the
hours of 7:00a.m. and 7:00p.m. Monday through Friday.
- Only construction equipment that does not exceed State of
Washington maximum environmental noise standards should be used.
- Construction equipment should be placed as far away from
sensitive noise receptors as possible.
- Construction activity should be scheduled so that all truck
traffic does not occur concurrently in order to avoid vehicle
congestion.
Impacts (Long-Term)
Increase in traffic and train movements will result in a
proportionate increase in noise levels. Increases in noise levels
due to human activity at the site will occur.
Mitigating Measures
- Landscaping, careful site design and berming should be utilized
near main roads to deflect noise and reduce its impact.
- See "Vehicular Transportation Generated - Mitigating Measures,"
p. 81 of the DEIS.
- Installation of rubberized railroad crossings where the access
road would intersect the railroad spurs to the south of the
site would decrease noise generation.
-xiv-
7. Light and Glare
Impacts
Addition of low level lighting on the site. The traffic generated
by the site will increase the incidence of headlight glare. Some
glare will be produced by reflections from windows and possibly the
buildings themselves.
Mitigating Measures
- Building wash lighting should not be used.
- Perimeter landscaping, fencing and berming, especially around
parking areas and road entrances could reduce light spillage.
- Parking area lighting could be directed so that no direct light
spills off the site.
8. Land Use
Impacts
Change in the land use from old growth riparian forest and open space
to office park with warehousing.
Mitigating Measures
An alternative development design with limited building area could
retain significant areas of the site in open space.
9. Natural Resources
Impacts
Removal of most of the existing vegetation and open space on the
site. Consumption of some natural resources for construction and
maintenace of the project.
Mitigating Measures
Building elements could be analyzed for use of techniques, wherever
possible, permitting recovery of materials used in construction.
10. Risk of Explosion or Hazardous Emission
Impacts
There will be a slight risk of hazardous emission or explosion
during construction and potentially from future tenants.
-xv-
•
Mitigating Measures
None.
B. HUMAN ENVIRONMENT
1. Population and Housing
Impacts
A slight increase in local housing demand may result due to
employees desiring to relocate near their work. Also, day time
, population levels at the site will increase to about approximately
4,100 permanent employees.
2. Employment
Impacts
Increased short-term employment during construction and long-term
employment once the development is complete.
Mitigating Measures
None.
3. Transportation/Circulation
Impacts
The proposed Black River Office Park is anticipated to generate be-
tween 9,070 and 34,030 vehicles per day and between 1,250 and 3,970
vehicles during the evening peak hour. This additional .volume will
exacerbate the existing congestion .at most of the intersections
along major arterials.
•
Mitigating Measures
a) To reduce potential safety hazard, Monster Road should be
upgraded to accommodate heavy trucks and increased traffic
volumes. This may involve recharmelization and possible
signalization of the Sunset Boulevard/Monster Road inter-
section.
•
•
•
-xvi- .
b) To discourage the use of single occupant vehicles, the City
may consider limiting the number of required parking spaces
to less than is currently prescribed by the zoning code.
c) The road proposed to be constructed along the west edge of
Earlington Park, to the south of the site, could be extended
in such away to provide westerly access from the Black River
Office Park, in order to reduce traffic volumes that flow
through rarlington Park.
d) Establish a new bus route or modify an existing bus route to
pass through the project.
e) If bus service is modified to be convenient, provide bus
passes as a company or office park benefit.
f) Office park management should advise tenants and their
employees of the advantages of fleet ride, vanpool and car-
pool programs through a package of information provided at
initial occupancy for each tenant and coordinated through the
Seattle-King County Commuter Pool agency. Office park manage-
ment should also schedule public information meetings for
employers and employees.
g) As much as practical, office park management should encourage
employers to initiate a flextime work schedule so peak period
traffic can be distributed more evenly over the 3:30 to 5:30
p.m. peak period.
h) Any roadwork on-site could be conditioned to allow open at all
times a portion of the road wide enough to peLlydt emergency
vehicle access.
i) Grade an alignment from Thomas Avenue S.W. which would intersect
the road system on-site with a gravel sub-base wide enough to
allow emergency vehicle access.
j) Disruption of traffic flow in the internal road system could be
minimized by installing utilities, within the right-of-way, but
outside the roadway proper.
•
-xvii-
4. Public Services
a. Fire Service
= Impacts
Over the short-term, construction activity may increase the
hazards of fire fighting. Construction of the proposal would
significantly impact the fire protection responsibilities of
the Renton Fire Department. This development, coupled with
future development in the area, would necessitate improvements
to provide timely first response capabilities.
Mitigating Measures
- Sprinkler systems installed in buildings per City Code and
Fire Marshall 's requirements, will reduce the amount of fire
flow required.
- Non-combustible building materials would reduce risks of
fire.
- Industrial tenants could be limited to uses that do not
utilize flammable materials.
b. Police Service
Impacts
Demand for police protection will increase.
Mitigating Measures
- Tax revenues generated from the development will help offset
the cost of additional service.
-xviii-
•
- Internal security systems could be installed in the building.
- Exterior lighting should be placed at strategic locations to
provide additional security measures.
•
c. Hospital Facilities
Impacts
The proposed project is not expected to significantly affect
usage of the Valley General Hospital .
Mitigating Measures
On-site first aid facilities within major buildings should be
provided.
d. Parks and Recreation
Impacts
Development of the site will preclude any future development or
designation for park use. ! -
Mitigating Measures
None.
e. Maintenance
Impacts
Increased demand for City maintenance of streets , water,
sanitary sewer and stormwater drainage systems.
Mitigating Measures
None.
5. Energy
Impacts
Increase in demand for electrical power and natural gas and
possible increase in demand for energy associated with
transportation.
-xix-
Mitigating Measures
- Insulation in roof, walls, flooring and glass should be
utilized.
- Energy analysis of building design should be performed.
6. Communication
Impacts
Increase in demand for telephone service.
Mitigating Measures
- All telephone lines will be installed underground.
- Installation of telephone lines will be coordinated with
installation of electrical lines.
7. Public Utilities
Impacts
Existing water supply and system would experience some
additional demand. Deterioration of water quality entering the
combined sewer and storm drainage system is possible during
construction activities. In the long-term, the quantity of
water entering the system will increase due to increased
impervious surfaces on the site. Also, project development
would generate increased solid waste and sewage flows from the
site.
Mitigating Measures
Site runoff will be directed to the old Black River Channel
where it will receive wetland treatment prior to its discharge
into Springbrook Creek.
8. Human Health
Impacts
Increased noise levels due to construction, traffic and other
human activities may affect the health of nearby residents.
-xx-
Mitigating Measures
- Noisy operations should be scheduled so that they are not
concurrent.
- Phased development should be planned which would reduce the
size of movements of construction noise.
- Construction equipment should be operated only between the
hours of 7:00 a.m. and 7:00 p.m. Monday through Friday.
- Only construction equipment that does not exceed State of
Washington maximum environmental noise standards should be
used.
- Construction equipment should be placed as far away from
sensitive noise receptors as possible.
- Construction activity. should be scheduled so that all truck
traffic does not occur concurrently in order to avoid
vehicle congestion.
9. Aesthetics
Impacts
Visual appearance of the site will be altered.
Mitigating Measures
Site design and retention of some existing vegetation will
soften the impacts of the bulk and mass of buildings.
10. Archaeological/Historical
Impacts
Project development may cover potentially archaeologically
significant portions of the site, specifically Duwamish Indian
sites . (Refer to the letter from the Office of Public
Archaeology in Appendix D of the DEIS.)
Mitigating Measures
The Office of Public Archaeology of the University of
Washington will conduct borings at 25 meter intervals in the
areas considered to have high archaeological potential and at ,
50 meter intervals at other undisturbed areas to confirm
specific locations prior to development of the site.
-xxi-
11. Economic Factors
Impacts
The project would create short-term construction employment.
The development would also partially ease the demand for
industrial building space. The City of Renton will receive an
increase in tax revenues and municipal costs generated from the
project.
Mitigating Measures
None.
III . Alternatives - Please refer to the comparative analysis in Table 10 on
page llla.
Alternative 1 - Development of 75% of the site with 25% in concentrated
open space.
This alternative is slightly greater in density than the proposed action,
but the site plan would be so designed to allow 25% of the site to remain
in concentrated open space. This open space would most likely manifest
as a greenbelt of varying width along the old Black River Channel and
Springbrook Creek located at the site' s southern perimeter.
Impacts
This alternative would retain approximately 25% of the site in its
natural state as a riparian forest. The impacts of this development
alternative would be slightly greater than the proposed action; however,
the difference in impacts is not readily quantifiable. It is expected
that this alternative would generate slightly greater impacts in the
following elements: soils, topography, erosion, air quality, runoff,
flora, fauna, noise, light and glare, natural resources, employment,
transportation/circulation, public services, aesthetics, and economic
factors. When definite site plans become available for review, specific
differences in impacts can be assessed.
-xxii-
Feasibility
According to the developer, this alternative is economically desirable
and feasible. However, the increased impacts caused by an increase in
density would reduce feasibility with respect to service from city and
public utilities, as well as diminish the acceptability of project
development in regard to the physical environment (soil , topography,
runoff patterns, flora, fauna, light and glare, noise levels and natural
resources.)
Alternative 2 - Development of 46% (33 acres) of the site with 38 acres
remaining in open space.
Description
This alternative differs from the proposal in that building would occur
on only Phase 1 of the property with the remaining 38 acres (the western
one-half of the site) preserved in open space reserve to mitigate the
development impacts.
Impacts
Overall , this alternative would place decreased demand on the physical
environment. Specifically, no development would take place in the
western portion of the site. This area would be preserved as open space
which would eliminate the impacts on soils, topography, runoff patterns,
flora, fauna, light and glare, noise levels and natural resources for
that area. Impacts to the physical environment in the developed areas
would be comparable to those of the proposed project.
Impacts to the human environment (public services, utilities, energy and
archaeological resources) would be similar to the proposed project.
However, impacts on such elements as transportation/circulation, air
quality, noise and employment would be diminished.
Feasibility
This alternative would reduce the amount of leasable building space by an
undetermined amount. There is a high demand for rail-served warehousing
which may not be tapped if the project were to exclude this use.
-xxiii-
Alternative 3 - No Development
Description
This alternative would leave the site in its undeveloped state on a
permanent basis or on a temporary basis until some other proposal for
development is approved by the City. However, pressure to develop would
continue due to Manufacturing Park designation on the Comprehensive Plan, .
development of the surrounding properties and increasing demand for
industrial land development.
Impacts
All adverse environmental impacts of the project would be eliminated with
this alternative. The positive economic benefits of the project, such as
increased property taxes, creation, of short- and long-term employment and
partial alleviation in demand for industrial land would also not occur.
The most significant impact of this alternative would be preservation of
the riparian forest which would extend the opportunity to the City to
purchase the site and preserve it as a green belt. No development would
shift the impacts of development to other sites which may be more or less
suited for these uses.
Feasibility
. The "no develoment" alternative would not meet the objectives of the
proponents. The feasibility of the City in acquiring the site for the
purpose of presesrvation is unlikely due to the market value of property
and the City's Comprehensive Plan designation of the site for manu-
facturing park use. However, the City may require preservation of
substantial portions of the site due to the potentially adverse
environmental consequence of development.
IV. Unavoidable Adverse Environmental Impacts
I. The Physical Environment
A. Earth
1. Changes in the contours of the site, including excavation depths of a
maximum of 10 feet for utilities.
2. Addition of fill over native soils. - .
B. Air
1. Increased air pollution from automobile emissions.
2. Increased particulate levels due to construction activity and
additional traffic volumes.
3. Short-term odors during construction activities.
C. Water
1. Increased surface runoff from the site which may contain an increased
level of urban pollutants.
2. Potential alteration of ground water movement, quantity and quality on
the site.
D. Flora
About two thirds of the natural riparian vegetation on the site would be
removed.
E. Fauna
1. A reduction in the ability of the site to serve as habitat for
wildlife.
2. Reduction in number and diversity of wildlife.
F. Noise
1. Increased noise levels over the short-term due to construction
activity.
2. Increased noise levels over the long-term due to human activity and
increased traffic and rail volumes.
G. Light and Glare
Light and glare will be emitted from the site to surrounding properties.
-xxv-
H. Land Use
1. Loss of open space.
2. Preclusion of alternative land uses for the site during the life of
the project.
I. Natural Resources
1. Consumption of building materials and energy.
2. Conversion of open space to warehousing and commercial uses.
II. The Human Environment
A. Population and Housing
Very slight increase in population to the City.
B. Employment
None.
C. Transportation/Circulation
Traffic impacts will be increased as a result of project development.
D. Public Services and Utilities
Increased demand for all public utilities and public services.
Cumulatively, with other developments in the valley, utilities and
services will eventually need to be increased.
E. Aesthetics
Visual 'appearance of the site will be altered.
F. Archaeological/Historical
The potential removal of an archaeological site.
G. Economics
Unknown.
-xxvi-
DESCRIPTION OF THE PROPOSAL
I. Name of Proposal
Black River Office Park
II. Project Sponsor
Alterra Corporation
2120-A S.W. 152nd St.
P.O. Box 66101
Seattle, WA 98166
The proponents have requested a rezone of 71.16 acres from General
Classification (G) to Manufacturing Park (MP) . The development, to be
completed in two phases, will contain rail-served warehouse and an
office park.
III. Project Location
The proposed project is to be located on a 71.16 acre site, approxi-
mately one mile west of the Renton central business district. The site
is bounded on the north by the Burlington Northern Railroad Right-of-
Way, on the east by the proposed Earlington Woods Planned Unit
Development, on the south by the proposed Earlington Industrial park,
and on the west by Monster Road and the P-1 pumping station.
IV. Other Agencies Maintaining Files on the Proposal
None.
V. Site Description
Roughly 11.5 acres of the 71.16 acre site have been cleared and about
59.5 acres consist of riparian forest. Approximately 5 acres of the
cleared portion of the site is presesntly used for dumping purposes for
a land fill . Access to the fill area is via a dirt road adjacent to
the railroad intersecting Monster Road. The remainder of the site is
heavily vegetated by a riparian forest. The site is generally level
except for those areas near the railroad tracks which have been filled.
xxvii- .
•
VI. Description of the Surrounding Area
The immediate vicinity of the project site is characterized by a
combination of rapidly developing industrial lands and undeveloped open
space with several residences to the east. The site is north of and
contiguous with the Earlington Golf Course; this acreage has been
r proposed for development as Earlington Industrial Park. North of the
site is the Burlington Northern (B.N.) railroad tracks. Across the tracks
• from the site is, a heavily wooded slope covering the south side of
Earlington Hill. To the west is the King County Black River Watershed
pump station and Monster Road. To the east and northeast is the proposed
Earlington Woods Planned Unit Development.
•
•
. VII. Major Physical and Engineering Aspects of the Proposal
Definite site plans have not been determined. However, tentative land
use percentages are as follows:
• Site Coverage
Use Acreage Percentage •
Warehouse 12.09 17%
Office 35.58 50% •
Roads 2.85 4%
Total Developed 50.52 71% .
Open Space • 20.64 29%
(Approximately 35% of the riparian forest would remain
upon development.)
Also, the proponent intends to impose development restrictions,
including the following:
;
1. The minimum tract size for any development shall be 2 acres..
2. Maximum land coverage by building shall be 40 percent.
3. Maximum site coverage by impervious surfaces shall be 70 percent.
4. Each developed site shall' retain a minimum of 20 percent of the L
natural vegetation in a contiguous pattern.
5. An architectural control committee shall approve all structures in
order to ensure that the design is complementary to the existing
environment in the area. •
. I.
• -xxviii- . •
A
: .,
. .
;4r
WRITTEN COMMENTS FROM GOVERNMENTAL AGENCIES
F
11 AND RESPONSES TO COMMENTS
i.
i.
AI .. .
4. -
�'
4
el
7gl
. .
I/
't
A .
4 .
. .
. .
4
•
4.17)$!S
T1T,rp�,� DEPARTMENT OF THE ARMY
SEATTLE DISTRICT. CORPS OF ENGINEERS
ki P.O. BOX C-3755
isC :' SEATTLE. WASHINGTON 98124
- - \AT[S'OFAglei2
NPSEN-PL-ER '"." t981
David R. Clemens, Acting, Planning Director
Environmental Review Committee
City of Renton
200 Mill AvenueSouth
Renton, Washington 98055
•
Dear Mr. Clemens:
We have reviewed the draft environmental impact statement for the Black
River Office Park Rezone, Renton, Washington, with respect to the U.S. Army
Corps of Engineers' areas of responsibility for flood control, navigation,
and regulatory functions. Our comments are attached as inclosure 1.
Thank you for the opportunity to review this statement. If you have any
questions, please contact Dr. Steven F. Dice, telephone (206) 764-3624, of
my staff.
Sincerely,
1421V.1 A/'";4/ 7t1.1
1 Incl =NO KNUTSON, P.E.
- - As stated AUL Enginaring Division
Copies furnished:
See attached page •
,�% RFC
RECE141Ea c)
i fv
JUN 1 1981
NPSEN-PL-ER
David R. Clemens , Acting Planning Director
Copies furnished w/incl:
Mr. William Cokely
Soil Conservation Service
232 Main Street South
Renton, Washington 98055
Mr. Donovan Tracy
King County Division of Planning
King County Courthouse, Room W217
516 Third Avenue
Seattle, Washington 98104
Richard Houghton, Acting Director
Public Works
City of Renton
200 Mill Avenue South
Renton, Washington 98055
Honorable Barbara Y. Shinpoch
Mayor of Renton
Renton, Washington 98055
Dave Clemens, Acting Director
Planning Department
200 Mill Avenue South
Renton, Washington 98055
2
I .
NPSEN-PL-ER 20 May 1981
COMMENTS: Draft Environmental Impact Statement (EIS) , Black River Office
Park Rezone, Renton, Washington
• 1. Under Section 404 of the Clean Water Act, a Department of the Army
permit is required for the discharge of dredged or fill material into
the Black River west of the dam and pumping stations near Fort Dent
Park, as well as for any fill in wetlands associated with the western-
most reach of the Black River.
2. Page 3, paragraph b, Floods. The majority of the proposed site is
classified as a Broadleaf Swamp, with a smaller portion on the northwest 2.
border classified as Shrub Swamp, according to classification criteria
developed by the U.S. Fish and Wildlife Service (FWS) in their National
Wetland Inventory. Both classifications provide valuable benefits for
storm water retention, wildlife habitat, and water filtration/purifica-
tion. Filling or alteration of these areas may also require concurrence
on the project from the FWS, as well as a Section 404 permit from the
Corps of Engineers.
3. Detailed analyses are required to evaluate impacts on flooding from
deletion of existing storage areas and acceleration of runoff to assure
that flooding will not be aggravated.
•
4. Page 55, paragraph 3A, second paragraph, and page 88, paragraph 4F,
last paragraph. The proposed development would have little adverse
effect on runoff if the proposed Soil Conservation Service (SCS) East
Side Watershed Project is completed. The SCS design has sufficient
hydraulic capacity to accommodate all the increase in runoff related to
the development described in the EIS. The Black River pumping plant has
sufficient capacity with or without completion of the channel improve-
ments upstream of the pump plant. However, since conveyance to the pump
plant is insufficient without charo'el improvements, loss of storage r 4
spa^.e by landfill would force water presently stored in the proposed
office park area to other areas.
5. The EIS clearly (and correctly) states that "project development
will result in increased surface runoff and simultaneous reduction in
flood storage capacity of the site which will contribute to flooding
conditions. . ." (page 98). However, it does not provide enough
detailed information or data to adequately assess the impacts from this
increase in surface runoff, decrease in flood storage, and the contribu-
tion to flooding.
a. There is no quantitative data to indicate the magnitude of
increase in runoff, decrease in flood storage, or the type and magnitude
of change in flooding proolems resr:ing from the proposed project.
/' I -3-
b. More specifically, there is no quantitative data on the impacts
of this project on the SCS's Eastside Watershed Project. Will it impact
the feasibility or flexibility of the SCS project? SCS's project should
be listed on page 19, "The Relationship of Proposal to Existing Laws,
Policies, and Plans."
c. There is no discussion of what will be done about the proposed
project's "contribution to flooding conditions" until the construction
of SCS's P-1 channel and detention pond are completed (see page 98).
The proposed Black River project will contribute to the flooding problem
and there is no guarantee of when, if ever, the Eastside SCS project
will be constructed. Further analysis is needed on the impacts of the
project on flooding in the absence of the SCS project. The EIS should
indicate alternatives available, if any, to the valley cities in con-
taining additional rates of storm water runoff. If studies indicate
that the expected increases in runoff rates and volumes cannot be pro- 1.
vided for, the EIS should then point out anticipated impacts to the
natural environment as well as to plans for valley flood reduction
measures now proposed by the Corps of Engineers, King County, and other
valley cities.
d. The EIS does not discuss the combined impacts and/or cumulative
effects of the proposed Black River Office Park project and the Earling-
ton Woods Planned Unit Development (PUD), located east of the proposed
project site, with regard to increased surface runoff, changing drainage
patterns , etc. The Earlington Woods PUD "is being constructed, and run-
off from the site is and will be routed through the Black River Office
Park site and into Springbrook Creek which drains the wetlands at the
proposed site (page 54). -
e. The EIS states that storm water runoff will receive "wetland
treatment." First, this term needs to be defined. Second, since the
proposed project will increase surface runoff and decrease the wetlands,
will the remaining wetlands be adequate for "wetland treatment" of the
runoff?
6. Generally, the EIS lacks detailed information. It is difficult to
assess the impacts of the project on flood plain management objectives, (Q
water quality, the need for a 404 permit, the SCS project, and induced
flooding (these last two are of interest and indirectly related to the
Corps' Green River Flood Damage Reduction Study).
-4-
Response to Comments from the Seattle District Corps of Engineers
Comment Number: 1
The applicant has discussed with representatives of the Corps of
Engineers the applicability of the Section 404 permit to potential
development on the subject site. The Corps of Engineers indicated that
a previous decision regarding waterways upstream from the P-1 Pump Plant
could possibly exempt the site from the requirements of the 404 permit.
This matter will be reviewed in full at such future time when building
permits are sought in association with a specific development proposal.
Comment Number: 2
To incorporate the information provided in the comment letter from the
Seattle District Corps of Engineers, the following sentence is hereby
added to the discussion of "Surface Water Quantity/Quality - Existing
Conditions," on page 54 of the Draft EIS:
"These swamps provide valuable benefits for
storm water retention, wildlife habitat,
and water filtration/purification."
Comment Number: 3
Please refer to the response to comment 1, above.
Comment Number: 4
The consulting firm of Entranco Engineers has conducted a drainage
analysis for the Black River Office Park which has been included as
Appendix D of this document. The report addresses in detail the
existing and future conditions of estimated flood elevations and the
rate and volume of local stormwater runoff generated on the project
site. Table 1 on page 6 of Appendix D summarizes the estimated
volume of runoff accumulation and corresponding flood stage ele-
vation both with and without the P-1 Channel and for present and
projected future levels of development as indicated in accordance
with existing land use plans.
-5-
Comment Number: 5
Entranco Engineers has conducted a water quality impact analysis, the
results of which have been included in this document as Appendix A.The details of the wetland treatment proposed for the Earlington Park
and Black River Office Park developments are discussed on page A-3
of that report. Entranco Engineers has concluded that the old Black
River Channel has adequate storage ability "to provide a high degree
of water quality treatment for :the combined stormwater runoff from
existing and proposed projects in the vicinity." (page A-7)
These water quality improvements can not be achieved with the imple-
mentation of the P-1 forebay since the forebay includes major portions
of the existing Black River Channel. However, the existing quality
of Springbrook Creek is only slightly better than anticipated runoff
quality, and it is unlikely post development runoff will result in any
measurable increase in pollutant concentrations in Springbrook Creek.
(See Water- Quality Impact Analysis 'by ENTRANCO Engineers, Appendix A,
page 7) .
•
Comment Number: 6
Please refer to the response to comment 4 , above. •
-6-
,.,;;;,.Z..,. Wilted States Soil
.6� , Department of Conservation • Room 360 U. S. Courthouse
'q1 Agriculture Service Spokane, Washington 99201
June 1, 1981 C .z.,
. rt en'''JQ-\
Mr. Dave Clemens -
c,c,: �\i -!A
Ld Iv
Acting Planning Director o a
City of Renton ,u `' 1.,`�1
200 Mill Avenue South ��__.�.. -•
Renton, Washington 98055 . '� j
/
Re: Black River Office Park--DEIS ����/.�G DE� %��
Dear Mr. Clemens:
The Soil Conservation Service (SCS) has reviewed the Draft EIS for Black River
Office Park and has the following comments:
--The relationship of the proposed development to the current plans fcr the
East Side Green River Watershed Project should be discussed in greater
length than as on page 55. The site plan indicates that the area north I.
and northeast of the Black River pump plant will be developed. Green River.
Project Plans include this area as part of a holding pond (forehay) . We,
therefore, recommend that this area be excluded from development.
--On page 61, the report states that "vegetation along the Black River Channel
should be preserved and maintained by the proponent." It is important
that the width and length be stated, as the forest is an important design 2. •
feature of Green River's holding pond. The pond area will be designed to
provide habitat for wetland wildlife which will be enhanced by the "edge
effect" provided by the existing forest.
--Page 22, the development cf. the ; :parian forest would be a loss of a natural
• resource which has scientific and educational value. This is not recognized. )-
The forest is a• rare, old growth riparian stand of mature trees similar to
the vegetation that once existed along the Green River in this area. In
addition the riparian forest is a unique visual resource, in that it has high 4.
visual resource quality. It provides the large mass of green relief needed
in the landscape and acts as a screen and landmark.
•
--The statement considers saving isolated trees to enhance the visual effect
of the development. Considering the species involved and their tolerance
to development, it is questionable whether the trees designated to be re- . '
tained will survive. . Such development will severely interrupt the ecosystem
. presently functioning in the riparian forest.
--On page 37, there is a list of certain basic factors and site conditions 1 (0.
. desirable for industrial development. Some clarification is needed as to J
drainage since the area is a wetland. It is also questionable .as to the 1 7.
adequacy of the present road for high volume traffic.
•
•
. 6The Soil Conservation Service SCS-AS-1
A is an agency of Ino 10_79
\., , Department of Agriculture
-7-
Dave Clemens - 2
The City of Renton's recent wetlands study report, which indicates the multi- 8
purpose uses of wetlands and the ranking of the riparian forest, should be ack- • '
nowledged.
We suggest that consultation with the City of Renton continue to avoid conflicting l 9. '
circumstances.
If you have any questions, please contact Charles McAfee, ' state resource conserva-
tionist, Spokane, at 456-3708.
Thank you for the opportunity to comment.
Sincerely,
GYNN A. BROWN .
State Conservationist •
•
•
•
•
•
•
•
-8-
Response to Comments from the U.S.D.A. Soil Conservation Service
Comment Number: 1
• The East Side Wastershed Project is discussed in reasonable detail
on pages 86-88 of the Draft EIS, under "F. Other Governmental Ser-
vices. " According to David Clemens of the Renton Planning Department, •
the design for the placement of the P-1 Channel calls for a small
portion of the project site to be included in the forebay area, but
none of the forest is planned to be included. However, the proponent
of the Black River Office Park has indicated that he will revise the
site design as necessary to accommodate the placement of the P-1
improvements, once its plans are finalized. See also the response to
comment 4, letter from the Seattle District Corps of Engineers, on
page 5 of this Final EIS.
Comment Number: 2
As illustrated on the conceptual site plan on page viii of the Final EIS,
the vegetative setback from the southern property line would vary
from 50 feet to 150 feet and extend the full length of the southern
property line, excluding the segments intersected by the access roads.
The southern property line is approxmiately 5800 feet long of which 1150
feet have previously been filled. The remaining 4,650 lineal feet is pre-
sently forested.
Comment Number: 3
To incorporate the concerns of the Soil Conservation Service, the
following information is hereby included in the discussions of
"1.F. RESOURCE OBJECTIVE" (page 22) and "Parks and Recreation -
Impacts" (page 85) of the Draft EIS:
"The site, characterized by a rare, old growth
riparian stand of mature trees, exhibits scien-
tific and educational value which would be af-
fected upon project development. 'Development of
the property as- proposed in Figure 3 would elim-
mate approximately 65% of this resource."
-9-
Comment Number: 4
The final sentence of the initial paragraph of the discussion of
"Aesthetics - Existing Conditions" on page 94 of the Draft EIS is
hereby amended to read as follows: _
"It serves as a visual relief from the sur-
rounding developed areas of the Valley." -
The final sentence of the discussion of "Aesthetics - Impacts" on
page 95 of the Draft EIS is hereby amended to read as follows:
"Development of the property as illustrated
by Figure 3 will eliminate a portion of this
visual relief. (Approximately 65 percent of
the riparian forest is proposed to be removed) .The perception of reduction in visual relief will
vary depending on vantage points."
Comment Number: 5
Comment noted. These impacts are acknowledged on page 61 of the
Draft EIS.
Comment Number: 6
The factors and site conditions considered desirable for industrial
development listed on pages 37 and 39 of the Draft EIS were quoted
from the Renton Urban Area Comprehensive Plan. The discussion of
consistency of the proposed Black River Office Park with these guide-
lines commences on page 40, where it is acknowledged that the proposal
site is characterized by poor drainage and that it will be necessary
to introduce fill material in order to bring some areas of the site
above the 100-year flood level. The proposal is also inconsistant with
several related objectives of the City's Comprehensive Plan as described
on pages 21 - 24 in the Draft EIS.
Comment Number: 7
The TRANSPO Group has conducted a general traffic analysis of the po-
tential impacts of the proposed rezone of the subject site, which has
been included in this document as Appendix B. On pages 4 and 5 of that
report, the existing conditions as well as proposed mitigations for
Monster Road are discussed.
-10-
Funding of the improvements outlined in the attached traffic analysis,
(Appendix B) , will be based on a proportional use formula. The costs
for road and intersection improvements should be allocated in propor-
tion to the traffic volumes generated by the proposal compared to the
total traffic volume using the section of road and/or intersection that
is improved. Thus, costs would be allocated in proportion to the bene-
fit received. Necessary transportation improvements will be consistent
with phasing of development.
The issue of how the City of Renton and/or other developers fund nec-
essary improvements, excluding those required of the development des-
cribed in this EIS, are beyond the scope of this EIS. An in depth traf-
fic operational study to define problem areas and offer measures of
mitigation will be done when a definite development proposal is submit-
ted for this site. See letter from City of Renton Public Works Director
Richard Houghton, last page of this EIS.
Comment Number: 8
On February 28, 1981, the City of Renton issued Wetlands Study: A
Reconnaissance Study of Selected Wetlands in the City of Renton
which evaluates significant remaining wetlands in the City with the
intention to develop an overall policy for protection of wetland
functions. The study contains general policy recommendations as well
as specific recommendations for preserving certain wetlands. The
Black River Riparian Forest, contained within the subject site, was
ranked by the study as the most important wetland in the study area,
thereby warrenting all reasonable measures to permanently protect it.
According to David Clemens of the Renton Planning Department, the study
has been accepted as a technical document and is awaiting review by
the Planning Commission. . It has not been adopted as policy by the
City Council.
Comment Number: 9
Comments noted.
-11-
V. •
z ,"$I Ofi
�(' f� United' States Department of th•
e Interior
/4 „ `2r -
W
roi i�tsv;. 1 .'O�
,, /-/ FISH AND WILDLIFE SERVICE
\'-,:r". :'= / Ecological Services
2625 Parkmont Lane, S.W. ,. Bldg. B-3
• O1'ympia, WA 98502 .
May 28, 1981 '�•
r �'6�s,
\
David Clemens,. Acting Planning Director 1 PLAY 29 1981
City of Renton Planning Department . • •�
Municipal Building ``9
. 200 Mill Avenue South :.j.
,,," _
. Renton, Washington 98055 • \LNG UEpA�
Dear Mr. Clemens: •
•
We have reviewed the, draft EIS for the Black River Office Park Rezone
and' a"re opposed to the proposed action. The Fish and Wildlife Service
has repeatedly emphasized the wild1ife'values of the Black River Riparian
• Forest in our review of various proposed projects (e.g.. the SCS East
Side 'Green River Project) . . Its value is also mentioned in the EIS
itself, as well as in your, own City of Renton Wetlands Study: "This '
forested wetland in (sic) considered the. most valuable wetland within .
the City. It is large, fairly isolated, has high Overall wildlife
diversity, high wildlife and waterfowl potential , and an extremely . •
_ unique vegetational character composed of a complex of old growth "
riparian species. It provides high value open: space and aesthetic
qualities. The interaction with Springbrook Creek and the P-1 channel
detention basin increases its wildlife habitat val.ue-(p. 11 )."
Although we have not made a detailed study- of the area, wildlife charac-
._ teristic to this type of habitat include: mink, long-tailed weasel , .
. river otter, raccoon, scr&^ch owl , great. horned owl , red-tailed hawk, • .
. grouse, swallows, belted kingfisher, 4nd great blue heron: These -
animals and the forest itself can provide a valuable recreational and
educational resource for:your community. These urban "wildlife areas are -
increasing in importance as both general public appreciation and recrea- L •
tional travel'. costs .rise. Accordingly, we do not believe a decision to .
enact the proposed rezone would be defensible from .a public interest
pe'rspective.-
•
We appreciate the very real difficulties faced by a city in acquiring
such lands, but we firmly' believe such long-term protection is as vital •
to the public interest as a viable business community. The uniqueness " 2
i of this area may, make its acquisition of interest to the Nature Conservancy.
Additionally, it is our understanding that the area is under priority
consideration for acquisition under King County's proposed Park and Open
-12-
1
.Space Bond Program. King County presently has a landscape architect
preparing conceptual development plans for including the forest in a Q.
recreation system linking Fort Dent Park and other areas along P-1
Channel and the Green River.
Obviously, the final decision is up to the city and will reflect your
underlying goals and objectives for, presumably, a balance between
economic development and resource protection that will result in the
quality of life desired by your constituents. We urge you to give our
comments your serious consideration.
Yours sincerely,
-
Charl es A. Dunn
Field Supervisor
•
-13-
Response to Comments from the United States Department of the Interior
Comment Number: 1
Comments reflecting opposition to the proposed rezone are noted. Any
future zoning or other land use decisions must balance the benefits
and detriments of development of the subject site. The proponent must
clearly support the proposals consistency with appropriate public plans
and policies, and show that the proposal is timely. If any of these is-
sues are unresolved, the plan as proposed could be modified, rejected
or deferred until sufficient certainty is achieved.
Comment Number: 2
According to Jeanette Veasey of the King County Parks Planning Department,
the King County Parks and Open Space General Obligation Bond Proposal is
tentatively scheduled to be placed on the ballot in the Fall of 1982.
The General Obligation Bond proposed is recommended in a report devel-
oped by a citizen committee entitled "Pro-Parks." However, Ms. Veasey
indicated that the riparian forest on the site is not included in the
acreage to be considered for acquisition.
-14-
-
...
DONALL)W mOOS
r.. Director
S iiNC,TON
kTivili NT OF ECOLOGY
PV-H ' iipf ; igt on 98504 o (206)753-2800
May 21, 1981
- . •
•
• •
Mr. David Clemens •
Acting Planning Director • . •
City of Renton . . • •
Municipal Building
200 Mill Avenue South
Renton, Washington 98055
Dear Mr. Clemens:
Thank you for the opportunity to review and comment on the draft
environmental impact statement (EIS) , Black River Office Park.
Department staff at our Headquarters and Northwest Regional Office
(NWRO) have reviewed the document and have the following comment.
Renton Sewage Treatment Plant is currently operating at or
above capacity and occasionally violates National Pollutant
Discharge Elimination System permit limits. It may be
several years before the plant is upgraded. The sewer
. service for additional sewage flow may not be available
•
until the treatment plant is expanded. •
If you have any questions, please contact Mr. Mike. Dawda (885-1900)
at our Northwest Regional Office, 4350 - 150th Avenue N.E. , Redmond,
WA 98052.
Sincerely,
cL1--b-104ti-
Debbie Fristoe
• • Environmental Review Section
DF:me
•
cc,: Mr. Mike Dawda
5 .
2'15= 1 •
Response to Comments from the Washington State Department of Ecology
z
Comment Number: 1
The EI5 is concerned primarily with the request for rezone, however, it
attempts to anticipate potential impacts to elements of the environment
that construction of an office/industrial park may have. If treatment
capacity at the Renton Plant is insufficient, a moratorium on sewer
service is possible at the time of a specific development proposal,
however, insufficient capacity may also be a factor. in the city's review
of the rezone and its decision as to whether the rezone is "timely"or not.
•
•
•
•
•
•
•
-16 •
-
•
_
GOVerMP
I_j _i Al•. T IviEl i OF FISHERIES
J '. ii,liii h:, Vi /I;;Iii{On`ly:>0-r it (.!X,J i.�..> h Cto) C: '(5C.`tilaf_.i-;-1,(q,/
May 28, 1981
City of Renton Planning Departmen,. d
Municipal Building MAY 29 1981
200 Mill Avenue South
Renton , Washington 98055• -
• Attention David Clemens j�, EPt`�D
Gentlemen:
Draft EIS - Black River Office Park
Sponsored by Alterra Corporation
The Department of Fisheries ' staff have reviewed the above referenced
Environmental Impact Statement and have the following concerns.
Reference is made several times in the EIS that a 50-foot setback from the
top of the bank of the Black River channel will be maintained. The EIS
also indicates that the majority of the site is wetland and will require fill .
For the purpose of measuring the 50-foot setback, what is considered to be
the top of the bank? What would be the physical dimensions and configuration
of the riparian zone?
The EIS indicates that oil/water separators could remove most pollutants from
the stormwater runoff. Apparently the applicant or the City of Renton is
designing an improved system. This is encouraging from the standpoint that . 2.
most of the systems currently in use are inadequate to maintain desired water
quality. We would be interested in reviewing the updated designs for
oil/water separator systems.
It is also planned to route stormwater runoff from the site to the Black River
Channel where it will receive wetland treatment prior to discharge into
Spr.ingbrook Creek. However, one of the unavoidable adverse impacts will be
an increase in urban pollutant levels in the runoff. What will be the effects
of these pollutants upon the wet:and? Will the character of the wetland be
altered, thus further eliminating what is described in the Draft EIS as , 3'
" .. a 70-acre climax riparian hardwood ecosystem, the last remaining example
in -the lower Green River Valley" (page 49)?
The statement on page 63 should be corrected. . Chum salmon are "an important q._ •
species in the Green River system, however, they do not migrate into the J
Springbrook system.
City of Renton -2- May 28, 1981
It would also be helpful to show how this project will relate to the current e
plans being developed by the Soil Conservation Service for the flood storage }
area upstream of the P-1 pump plant. .
A Hydraulic Project Approval issued by the Washington Department of Fisheries
and the Washington Department of Game will be required prior to the start O.
of any work activity within the 1rdinary high flow line of Springbrook Creek,
the Black River, or their tributaries.
Thank you for the opportunity to comment. • .
Sincerely,
• Rolland A. Schmitten, '
Director
•
•
•
•
•
•
•
-18-
Response to Comments from the Washington State Department of Fisheries
Comment Number: 1
The minimum 50-foot setback from the Black River Channel depicted on
the conceptual site plan on page viii of the Final EIS, was calculated
from the southern property line of the site. The applicant, as well
as other owners of property abutting the proposed P-I Channel improve-
ments, are continuing to negotiate with the King County Hydraulics and
Soil Conservation District in considering their design criteria in re-
lation to proposed development for adjacent properties. In this respect,
the precise location of the preserved riparian zone has yet to be finalized.
In order to assure a minimum natural setback of 50 feet the final land use
design should calculate this setback from the future P-1 forebay property
line. It should be noted that the 50 foot setback is the proponent's de-
sign proposal. Specific dimensions approved by the city in the land use
approval process may be more or less than this dimension.
Comment Number: 2
As discussed on page A-3 of Appendix A, entitled Water Quality Impact
Assessment by Entranco Engineers, the use of oil/water separators, in
conjunction with the proposed wetland treatment, and gabion structures,
as well as frequent street cleaning, should result in sufficient water
quality treatment so that no significant degradation to Springbrook
Creek would occur. Installation and maintenance costs of the storm
water system which treats on-site storm water will be borne by the pro-
ponent./
Comment Number: 3
Development of the property as currently proposed would eliminate approx-
imately 77 percent of the riparian forest. Entranco Engineers has ana-
lyzed the influence of the combined surface water runoff from Earlington
Woods PUD, Earlington Park and the proposed Black River Office Park on the
proposed wetland treatment of the old Black River Channel. The results of
analysis have been included in this document as Appendix A. As stated on
page A-5 of that report, ". . . the treatment available in the old Black
River is sufficient to remove more than 70 percent of pollutants." result-
-19-
ing a higher quality of runoff than presently exists in Springbrook
Creek. However, implementation of the P-1 Forebay would eliminate the
Black River Channel's ability to filter out pollutants since the forebay
includes major portions of the existing Black River Channel. (See the
Water Quality Analysis, Appendix A, page 7 of the Draft EIS.)
Comment Number: 4
The discussion of "Fauna - Existing Conditions," on page 63 of the Draft
EIS is hereby revised as follows:
"A Washington State Department of Fisheries report
indicates that Springbrook Creek is one of the im-
portant tributaries supporting runs of Coho salmon.
However, Chum salmon do not migrate into Springbrook
Creek."
Comment Number: 5
A graphic depiction of the proximity of the subject site to the
current design of the SCS forebay area is shown on the site plan on
page viii of this document. This forebay area would require about
four acres of the proposal site, In addition, included as Appendix D
of this document is a Drainage Analysis conducted by Entranco Engineers,
which examines the estimated flood elevations with and without. the P-1
Channel project for both present and future levels of development.
This information is summarized on Table 1, page 6 of Appendix D.
Comment Number: 6
Please refer to the response to comment 4, letter from the Army Corps
of Engineers, on page 5 of this document.
-20-
. . , .
. .
.t„f
!
. .
G.
, :
:
, • f Tv
JOHN SPELLMAN -ei FRANK LOCKARD
Governor . . .114 /qyy W OW STATE OF WASHINGTON
DEPARTMENT OF GAME .
600North Capitol Way,G/-11 • Olympia, Washington 98504 • (206)753-5700
June 8 , 1981
• r; � �ti,. i`11Ln 0
.1A
• ', 11
.; ;4 12. 19 81 -
Mr. David Clemens • f )
'\�, ,5 -- ___----- <`
City of Renton �`..,� .A.t';%
Municipal Building �;�' c,...
�! G -' `'
200. 2",ill Avenue South r
Renton, Washington 98055
- DRAFT ENVIRONMENTAL IMPACT STATEMENT:
Black River Office Park; 71. 16-acre
. manufacturing park adjacent to Black
• River in Renton, King County
Dear Mr. Clemens: . .
•
Your document was reviewed by our staff as requested;- our comments • •
follow.
You state, "Approximately 84% of the site consists .of a unique ,
wetland deciduous forest, .a. part of the largest forest of this
type in the Seattle area. • As a result of the proposed action
about 78% of this riparian forest would be removed and be replaced .
by building foundations, road and parking areas. " (page 4)
•
• As you know, wetlands such as this wooded swamp are ,important for
fish and wildlife resources. Wetlands serve as sponges. They •
store water in winter and buffer flood flows. In the summer they
dry out and release their water. to adjacent streams. This helps
maintain low flows in the stream in summer. .
1
You mention on page 54, "The Black River exhibits relatively high I
nutrient concentrations and low levels of both dissolved oxygen
concentrations and turbidity. Springbrook Creek is characterized
by high bacterial contamination and nutrient concentration; in
addition, state standards for dissolved oxygen concentrations are
exceeded. " .
The loss of wetlands would be expected to reduce dissolved oxygen
in the creek and river as flows are reduced in summer. • L
This proposal as planned may have some very serious consequences
for water quality.
• •
. . . -21 '- ', � -
Mr. David Clemens
June 8, 1981
Page Two 0
You state on page 55, "It is planned that stormwater runoff will
be directed to the Black River Channel where it will receive
wetland treatment prior to discharge into Springbrook Creek. "
Under this proposal, would silt, oil, grease, and other contaminants
be routed to the wetland? It is unlikely the remaining wetland
(50-foot wide) would be able to remove silt, let alone prevent
oil and grease from entering Springbrook Creek and Black River.
Further water quality degradations would impact fish resources
in the creek and river.
' Wetlands are important wildlife habitat. Wooded swamps provide
habitat for several tiers of wildlife. Because they border a
stream, they have increased wildlife value. Riparian areas serve
as wildlife corridors.
Your document lists mitigation measures that should or might be
done. We wonder what requirements would be placed on the develop-I 3.
ment to mitigate impacts, especially loss of wetlands, water
quality, and fish and wildlife habitat.
From your discussion of fauna and flora, it seems that a U. S.
Army Corps of Engineers section 404 permit would be required for
any fill in the wetlands. You will need to contact the Corps 4..
to find out if they have jurisdiction. However, any unauthorized
wetland fill in an area under the Corps' jurisdiction could be
subject to removal and financial penalty.
In short, we are very concerned over the loss of' the public' s \,
5.
fish and wildlife resources that would accompany this project. ,
Growth is going to have to be planned and be orderly if fish and
wildlife are to survive while urbanization is directed to those
areas most suited for it.
Thank you for sending your document. We hope you find our
comments helpful.
Sincerely,
THE DEPARTMENT OF GAME . .
Bob Zeigler App ed Ecologist
Environmental Affairs Program
Habitat Management Division
BZ :cv
cc: Agencies
Region ,
-22-
Response to Comments: from the Washington State Department of Game
Comment Number: 1
Entranco Engineers has conducted a water quality impact analysis, the
results of which have been included in this document as Appendix A.
•
The report includes a discussion of the effects of combined wetland
treatment of storm runoff discharge from Earlington Woods PUD, Earling-
ton Park and the proposed Black River Office Park. The use of oil/water
separators, installation of gabion structures, as well as frequent
street cleaning and the proposed wetland treatment, should result in
sufficient water quality treatment so that no discernable degradation
would occur to Springbrook Creek. Also see response 3 on page 19 of
this EIS.
Comment Number: 2 ,
"Existing Conditions - Fauna, " on page 56 of the Draft
EIS is hereby amended to include: "Wetlands are important wildlife hab-
itat. Wooded swamps provide habitat for several tiers of wildlife. Be-
cause they border a stream, they have increased wildlife value. Riparian
areas serve as wildlife corridors."
Comment Number: 3
When the Draft EIS states that mitigating measures "will" be undertaken,
it indicates that such measures are already planned as part of the proposal
or that the action sponsor will implement them. Use of other language
(such as "should" or "could") indicates that the City, at its discretion,
and in conformance with the City SEPA Ordinance and SEPA policies, will
consider these mitigating measures as possible conditions in association
with approval of a rezone or other development permit. Also see response
1 on page 14 of this EIS,
Comment Number: 4
Please refer to the response to comment 1, letter from the Army Corps of
Engineers on page 5 of this Final EIS.
-23-
Comment Number: 5
According to results of the hydrologic analysis conducted by Entranco
Engineers, water quality in the site vicinity would not be adversely
affected with the implementation of all the recommended mitigations.
Also, refer to the fourth paragraph of the response letter from the
Municipality of Metropolitan Seattle on page 32 of the Final EIS.
-23a-
•
it tI IN VI I I.\1•\\ • \V A UUI t t_1
c t n.or ; Secretary.
WASI IINGTON
DEPARTMENT OF TRANSPORTATION
li;i;l;tt,n lr;rru 11ra(I(st!>wirlm•G o Olyntl.;t•m, l•V'•ishinh(on 9850! o (20o);53-6005 •
May 18, 1981• • Cj •
Mr. David Clemens, Acting Director MAY of Renton Planning Department f'iA i 9 1981
Municipal Building •r,�1 ......................
200 Mill Avenue South '
Renton, Washington 98055
• City of Renton --•
Black River Office Park
Draft Environmental Impact Statement
Dear Mr. Clemens:
We have reviewed the subject document and have the following comments:
•
The Transportation/Circulation Section of this Draft Environmental
Impact Statement is very brief and general . The traffic that this
proposal will generate was not assigned to any of the existing or
proposed site access roads. Therefore, we have to assume that a
large number of the potential 9,070 to 34,030 vehicle trips per day •
that this development may generate will pass through the Monster
Road (68th Avenue South)/Sunset Blvd. (SR 900) intersection. Given •
this assumption we agree with the statement made on Page 81a of •
this document, "This may involve rechannelization and possible sig •
-
nalization of the Sunset Blvd./Monster Road intersection. "
The Department would like to point out that we have no money in our
current operating program to finance these improvements. The
developer through the lead agency should arrange .to finance these 2 .
improvements in the project capitilization to prevent the existing
and new users of the aforementioned intersection from suffering
under poor safety and operative conditions for the foreseeable future.
If you have any questions, please call Jim Leonard at 753-6644.
Sincerely,
•
ROBERT S. NIELSEN •
Assistant Secretary for Public
Tr-an tation and Planning
/(C
• By: JOSEPH BELL, Manager
Planning Implementation and
• Environmental Policy
RSN:sab
• JB/WBH
Response to Comments from the Washington State Department of
Transportation
Comment Number: 1
The TRANSPO Group has expanded its preliminary assessment of traffic
conditions in the vicinity of the Black River Office Park site, the
results of which are included in this document as Appendix B. It con-
tains a travel assignment estimate for volumes on Monster Road (page
2) and recommends various mitigations and improvements to enhance
smooth traffic flows (pages 4 and 5) . Because of the wide range of
potential traffic volumes that could use Monster Road (because of the
wide range of development potentials for this and other parcels in this
area) , it is impractical to specify a specific proportion at this point.
It is suggested, therefore, that at the time a more refined development
is planned for this site, the detailed traffic analysis and traffic as-
signment be used as a basis for determining the appropriate proportion
of costs. Final determination will be negotiated with the City using
the proportional use formula as a basis. (See Traffic Analysis, Appendix
B, pages 7 and 8.)
Comment Number: 2
As noted above, the funding for any of the improvements recommended in the
Traffic Analysis is intended to be based on a proportional use formula.
The costs for improvements to any connection with Monster Road and/or
extension of the roadway along the west side of Earlington Park should
be allocated in proportion to the traffic volumes generated by this
proposal compared with the total traffic volume using the section of
road that is improved. Thus, costs would be allocated in proportion
to the benefit received. Because of the wide range of potential volumes
that could use this road (because of the wide range of development poten-
tentials for this and other areas in the area) , it is impractical to
specify a specific proportion at this point. It is suggested, therefore, '.I
that at the time a more refined development is planned for the site and
its application filed, the detailed traffic analysis and traffic assignment
be used as a basis for determining the appropriate proportion of costs.
-25-
Comment Number: 2, (continued)_
Final determination of funding should be negotiated with the City using
the proportional use formula as a basis; the applicant has agreed to add
this funding mechanism as a condition of the rezone approval.
-25a-
•
•
! -
IMMUTER POOL May 28, 1981
VANPOOLS ��
RECE{VFb ®
BUSPOOLS .
PIDEMAFCHING David Clemens, Acting Planning Director MAY 29 1981
:XIL;LE WORKING HOURS City of Renton Planning Department .�
ARKING MANAGEMENT I Municipal Building ``� "'" •
200 Mill Avenue South
Renton, WA 98055 ®EPN��
;li i !;I:it;r:ohilrv)II II !-
District Administrator I Dear Mr. Clemens: •
Washington State
uaru,ient of Transportation I The Seattle/King County Commuter Pool has completed its review of the
Public Works Director I Draft Environmental Impact Statement for proposed Black River Office
;Ily 0! ;union
Park project. With respect to the Transportation/Circulation section
Traffic Enyine'er
of the EIS, Commuter Pool would like to make the following comments.
Km<)County
'Director at Public Works
City o,Kirkland I We commend and encourage the proponents initiative in addressing the
; transportation impacts and possible mitigating measures at this early
Manager of
Transit Development ' stage of project development. The suggestions to reduce parking space
Metro requirements at the project site; to provide subsidized transit
rran::portntion Engineer ! passes, to actively inform tenants and employees of fleetride, van-
c;flyof Bellevue ! pool, and carpool options, and to encourage the flex-time system of
Traffic Engineer I work scheduling, are all acceptable methods to encourage alternatives
Cry of Seattle Ito the single occupancy vehicle.
We realize this DEIS is intended to address the environmental impacts
•
lof the proposed rezone only at the general "land-use" level and that
! specific site plans and ac: Dmpanying detailed traffic/parking data are
still forthcoming. We nevertheless feel compelled at this time to
make several additional suggestions in an effort to more clearly spe-
cify the level of commitment required of the proponent to successfully
mitigate the adverse traffic impacts of this proposal.
We would like to recommend, upon completion of a detailed study of on-
site parking availability and usage, that the proponent thoroughly
explore the potential for supplementing an aggressive ridesharing
program which would include preferential carpool/vanpool parking, •
sponsorship of a vanpool program, and other affirmative efforts as a
means to reduce the traffic/parking impacts. We believe this is
• important because merely "advising" tenants and employees of the
advantages of fleetride, carpool, vanpool etc. is an insufficient
degree of commitment -to brir,, about the desired results. Neither is
it sufficient to assume that the worsening traffic conditions will
persuade commuters to seek alternative modes of travel. It has been
our experience that for large numbers of commuters to change their
travel behavior they must be given an opportunity to do so through
.
Arlt I-'KIN,COUN COUNTY
c i�'•u,till l?POOL
;'vrau iiuiklIng.Hoorn b00
r O. ri wci Avenue
,tsal{at W:r.r:u,r;Lon rfirl04
;:'ue) 'tiihl
-26-
•
page two
May 28, 1981
an organized ridesharing program. Such a program for this proposal
• (especially if coordinated with the nearby Earlington Office Park
development) could reduce the adverse traffic impacts to a more
tolerable level.
As the proposal design and activity mix become clearer, these
suggestions will more direc.v•'.y relate to the Black River Office Park
and can therefore be more effectively addressed in a subsequent draft.
We are including a list of possible methods the proponent might employ • _.
in devising solutions to the traffic/parking problem. Commuter Pool
would be happy to provide any assistance or answer any questions you
might have. If so, please contact Jan Aarts at 625-4500.
Sincerely,
r
V1)/// • I
.�i'
William T. Roach
Program Manager,
•
WTR:JAm
•
•
• -27-
•
1.
11 Initiate carpool/vanpool program for employees, either in-house or
•
through participation with Commuter Pool. (Ridesharing Ptog.)
• (. j' Employee transit subsidy provision to those employees who are unable
to participate in a car- or vanpool. Preferably pre- aid, and dis-
count included. (Ridesharing Prog.)
. Reduction in employer provi...ad parking. /Restriction in enplyee parking
spaces (long-term) (Parking Mgmt.)
Preferential parking for car-vanpool vehicles in employer provided
lots between 6 A.M. - .10 A.M. (Parking Mgmt.)
•
•
5. Inverted parking fee rate structure, e.g. , :
•
a. 50% discount for carpools of 2 passengers, including
driver.
b. 75% discount for carpools of 3 passengers, including
driver.
c. 100% discount for corpools of 4 passengers, including
driver. (Parking Mgmt.)
•
6) Work with Commuter Pool in adopting a suitable flexible work hour (flex-
time) program, e.g. , .
•
a. Employee-chosen staggered starts, with stable daily
schedules, but letting each employee's schedule begin
insofar as possible at the time he prefers over a
designated range such as 7:00 to 9:30 A.M. and end at
at time dependent on the staring time.
b. Flexible starts over a designated range such as 7:00. to
9:30 A.M. , with a fixed lunch hour and variation in
quitting time dependent on the starting time.
c. Flexible hours, defined as flexible starts plus per •
-
mission to vary the daily lunch hour at each employee's
convenience, usually over a specified range.
•
•
• d. Flexible days, which in addition to flexible hours permit
variations in the length of time worked each day, such
' as from six to none or ten hours, so that excess time
worked can be accumulated and used to take a part or all
of a day off--the most popular is Friday afternoon--from
time to time. (Ridesharing'Trog.)
65 . Work with Commuter Pool in determining the feasibility .of developing a
'vanpool program for the employees, e.g. , :
a. .Employer operate / .
•
•
• -28- '
•
b. Owner/Employee operated
c. Third party operated (Ridesharing Prog.)
8. Where there are on-site residential accomodations, a one month free
transit pass be provided to all new tenants. (Resedential) •
For employers with at least five company-owned vehicles, work with
Commuter Pool in determining the feasibility of permitting those
vehicles to simultaneously be utilized for employee ridesharing
purposes. (Ridesharing Prog.)
10. A reduction in the leasing rate, contingent upon the leasee's pro-
vision of preferential parking treatment of carpools and vanpools,
coupled with charging for parking. (Parking Mgmt.Z
4.1) Subsidize or share the cost of a subscription bus or shuttle bus
service where feasible. (Ridesharing Prog.)
Establish a transit/ridesharing information center in a visable,
well travelled area of the building providing information regarding
transit routes carpools and vanpools, location of Commuter Pool
program office. (Information)
Conduct a carpool and public transit information day twice a year •
with the assistance of Metro and Commuter Pool. (Information)
14. Establish parking rates where none previously existed which reflect
the actual cost of each space. (Parking Mgmt.)
15. Provide carpool, vanpool and transit information to all new residents '
(provided by C.P.) . (Residential)
16. Allocate a portion of guest parking lot facilities as common staging
areas for car/vanpools on weekdays from 7 A.M. to 6 P.M. (Residential)
•
•
•
•
•
-29-
Response to Comments from the Seattle/King County Commuter Pool
Comment Number: 1
The proponent of the proposed action appreciates the concerns of the
Commuter Pool with respect to the potential transportation impacts
associated with development of the site and will cooperate in estab-
lishing . a voluntary ridesharing program to reduce the traffic/parking
impacts.
-30-
•
•
> hQ ..
Municipality of Metropolitan Seattle
Exchange Bldg. ® 821 Second Ave.,Seattle,Washington 98104.
•
May 26, 1981
-••;\\
David Clemens, Acting Director
Renton Planning Department _
Municipal Building �. -- . f
200 Mill Avenue South
Renton, Washington 98055
Dear Mr. Clemens:
•
Draft Environmental. Impact Statement
Black River Office Park Rezone
• Metro staff has reviewed this proposal and offers the
following comments.
• Wastewater Facilities/Water Quality
We note the proposal is located within Metro' s Renton
Treatment Plant service area. Metro is preparing a
facilities plan for the Renton system with a grant from
DOE and EPA, in part because the Renton Treatment Plant has •
. reached its "design" capacity and continued development is
occurring within the service area. A draft plan for the
Renton service area was recently released for review and
comment and contains a recommended program for upgrading
the Renton system so that water quality and health will
continue to be protected. '
• The following water quality concerns should be discussed
in the FEIS:
•
to Design and maintenance plans for the on-site stormwater
detention facilities should be incorporated into the
Final EIS . The riparian forest and wetland on the
site are water recharge areas, and would serve a
valuable function in the stormwater control system if
they were saved from development. •
•
• • The Soil Conservation Service' s East Watershed Project
is described on pp. 86-88 of the DEIS . That section
lists elements of the SCS project which will control
stormwater from this and other developments within the 2.
Black River drainage sub-basin. The proponent should
• provide a schedule of the East Watershed Project as it
relates to the schedule for development of the office
park.
•
.•.�`,k:.1.TSi::.��,.« +;.L,r.,*c.-y*'4.'s 3. 8.'.C'F.',Ily'??.�h;?�F> ^P^�w
_—_� —-- - ti.iar�_ :�.f_:,ssui�s:l�+r3.�_�, ;,-=;,,o-:s�''�-.'1L•�'l,�i v'RS��`�'4,s±�y�.�^'-��'R'�fP:`t.-%`a,t..�.,�,:g' "- '�y.,.'.y" ,.�3°,ca 4-T:f t�-" mot;"
-31-
David Clemens
DEIS/Black River Office Park Rezone
May 26 , 1981
Page two
We anticipate no significant adverse impacts to adjacent
water quality provided that all mitigating measures listed
on pp. 104-105 of the DEIS are implemented . For further
discussion regarding the above comments please contact
Metro ' s Monitoring and Analysis Section at 447-6359 .
Transportation
We note the measures listed on page 8 of the DEIS regarding
use of transit to mitigate transportation impacts of the
proposal . Mr. Jerry Dow of Metro' s Transit Development
Division is available at 447-6627 to discuss possible
service extensions to the site . Ms . B. J. Carol , Supervisor 3 '
of Customer Assistance, can be reached at 447-4.829 to
discuss employee bus passes, transit information, and other
transit incentive measures .
Thank you for the opportunity to review and comment.
Very truly yours,
Rodney G. Proctor, Manager
Environmental Planning Division
RGP: shm
cc: B.J. Carol
Jerry Dow
Monitoring & Analysis
Response to Comments from the Municipality of Metropolitan Seattle
Comment Number: 1
Development of the site as currently proposed would eliminate approx-
imately 65.4% of the riparian forest on the project site, and would
replace approximately 70% of the site with impervious surfaces, thereby
reducing the natural stormwater. control and groundwater recharge propor-
tionately. As stated on page 55 of the Draft EIS, the stormwater drainage
will not be detained on the site, in accordance with the East Side Green
River Watershed Project. The EIS suggests that temporary stormwater
detention facilities be installed during the construction period. This
mitigation may be required as a condition of development, in which case,
the developer will install the facilities. This EIS has addressed the
impacts of rezoning the site from General Classification to Manufacturing
Park and development generally consistent with this zoning. When specific
development plans are proposed, additional:.EISs will be issued and, at
that time, specific design plans for on-site stormwater detention facilities
will be included.
Comment Number: 2
-As stated above, this EIS has addressed the impacts of the rezone of the
site from General Classification to Manufacturing Park, and the general
uses allowable by such rezone, rather than the impacts of a specific
development proposal. This site plan on page viii of this Final EIS is
intended to be representative of probable development to occur on the site;
however, as yet, no specific proposal is planned. Therefore, the relation-
ship of site development to the scheduling of the Eastside Drainage Project
cannot be determined at this time. However, failure of the SCS P-1 system
to be developed could affect development of the subject property. Natural
flood storage would need to be maintained unless an alternate flood reduc-
tion system were established. Such a program would be the subject of
other environmental documents and permit approval requirements.
Comment Number: 3
Please refer to the response to comment 1, letter from Commuter Pool on
page 30 of this Final EIS.
-33-
•
410 West Harrison Street,P.O.Box 9863 (206)344-7330
i' s� rti*; Seattle,Washington 98109}
^r)v�•`F•I,�•�J.7ks:'4 Cad\A�) lV%••3
•
May 27, 1981 •
Mr. David Clemens kECII�ED
16
Acting Planning Director V .�
City of Renton Planning Dept.
Municipal Building JUN 11981
200 Mill Avenue South .a
Renton, Washington 98055 • � •
Dear Mr. Clemens:
•
Black River Office Park
We are submitting the following comments based on our review of the
Black River Office Park draft E.:vrironmental impact statement.
•
It does not appear that the air quality impact from the estimated
9,000 to 34,000 vehicle trips per day has been addressed. This is
a significant amount of vehicle trips and the amount of potential
pollutants needs to be evaluated. It is suggested that on-site -7 I.
monitoring and modeling be performed to determine current and future
carbon monoxide concentrations. We strongly recommend that modeling
be performed to determine whether the project will delay attainment
of the carbon monoxide and ozone standards, since this project is -
located in the carbon monoxide and ozone nonattainment area. It is
also _recommended that all mitigating measures discussed in the re- 2•
port (page 53) be implemented to reduce construction related emissions.
•
The upgrading of existing roadways and other mitigating measures dis-
cussed in the Transportation section (page 80) should be implemented.
Thank you for the opportunity to comment.
SERVING:
KING COUNTY Sincere
410 Wesl Harnson SI. y
P.O.Box 9863
•
Seattle,g11180
(206)344/330
KITSAPCOUNTY \ w`" A'r'DL
jL
Dial Operator for Toll A. R. Dan koehler
Free Number Zenilh 8385
_ Bainbridge Island.98110 Air Pollution Control Officer
Dial 344.7330
PIERCE COUNTY .
213 Hess Building SC
•
Tacoma.98402
-,(206)383.5851
SNOHOMISH COUNTY •
(206)259-0288 •
•
BOARD OF DIRECTORS
_' CHAIRMAN Gene Lobe.Commissioner Kitsap County: VICE CHAIRMAN James B Flames,Councilman Snohomish County
F1oo Dunl:rp.Kurd County Executive. Glenn K.Jarslad,Mayo:Bame:4)o. William E.Mooro.Mayor Everett: F.Wc Parker,Mayo.Tacoma
Harvey S Poll.Member at Large. Charles Royer.Mayor Seattle, Joe Slorpni,Commissioner PierceCounly: A R D,unmkoehler,An Pollution Control Officer
-34-
Response to Comments from the Puget Sound Air Pollution Control Agency
Carbon monoxide monitoring inthe area was conducted at the Puget Power
Yard until June 1977. The peak hour carbon monoxide concentration re-
corded at that facility was 3.2 parts per million (ppm) , substantially
less than:, the Washington State ambient air quality standard of 35 parts
per million. It may be assumed that existing peak hour carbon monoxide
concentrations have increased from the 1977 level due to the increase in
traffic volumes in the area.
The methodology outlined in AP-42 "Compilation of Air Pollutant Emission
Factors," Second Edition, Supplement No. 5, February, 1976 was utilized .in calculating the potential increases in carbon monoxide concentrations
resulting from development of the proposed Black River Office Park. This
analysis was based upon worst case conditions occuring during the evening
peak hour, during which, according to the traffic consultant, maximum of
3,790 vehicles could be generated. In addition, base conditions for this
analysis are as follows: rush hour conditions (50% cold start, 10% hot
start) ; vehicle mix for a central city area at 10 miles per hour; 100 -
foot receptor distance; parallel winds (2 mph wind speeds) and 500 temper-
atures. The results of this analysis indicate that maximum traffic vol-
umes generated by project implementation could potentially produce average.
peak one-hour carbon monoxide concentrations of approxmiately 10.4 parts
per million (ppm) . .
The Washington State Air Monitoring Data for 1980, published by the
Washington State Department of Ecology, indicates that the nearest moni-
toring station recording levels of ozone is located in Kent, at which
there were no recorded violations of the national standard.
A more detailed air quality impact analysis will be prepared when speci-
fic development plans are proposed.
Comment Number: 2
Comment noted. .
-35-
King County,State of Washington ' Planning Division
Ron Dunlap,County Executive .1:1
Department of Planning and : ;• { `-: ss W217 King County Courthouse
Community Development ';;'�� • r : ,i,'i`,i 5163rd Avenue
/ Seattle,Washington 98104
John P.Lynch,Director
(206)344-4218
May 29, 1981
ccp.Vr
Ls t;_�'i t_� `4
Mr. David Clemens 110 DR
Acting Planning Director ,AA
City of Renton Planning Dept. _ v�/f
Municipal Building A ......
4 ,
200 Mill Avenue South ��,
Renton Washington 98055 \NG DV.0%
Dear Mr. Clemens:
Re: Black River Office Park--Draft EIS
We have reviewed the subject EIS and feel the proposal raises a number
of significant issues that need '.o be addressed prior to further ap-
provals by the City. Our concerns are as follows .
GENERAL COMMENTS
Relationship of Riparian Forest to East Side Project
Local sponsors of the East Side Watershed Project with the cooperation
of the Soil Conservation Service are completing right-of-way and design
studies for the first phase of the project, which includes the storage
pond area immediately south of the proposed action. Design studies
include plans dealing with revegetation and landscaping, fish and wild-
life enhancement and passive recreation development, all intended to
promote the storage pond area as a viable wetland marsh and wildlife
habitat offsetting the adverse impacts of channel construction in the
Renton area.
The riparian "edge" between the storage pond and Black River woods has
been identified as a significant element, important in its unaltered
form, for the habitat and wildlife potential of the storage pond to
realize its maximum potential . The final EIS and future site plans
should acknowledge the significance of the Springbrook Creek riparian
edge and should discuss what measures are proposed to minimize adverse
affects that would compromise enhancement plans for the storage pond
area. _
Additional Studies and Analysis
The draft EIS indicates that future environmental and economic consequences
—36—
Mr. David Clemens
May 29, 1981
Page 2
of the proposed development will be addressed in supplementary plans
and studies. These additional studies are noted throughout the draft
statement and include detailed site plans, additional environmental
documents, economic analyses of costs and revenues accruing to Renton
from the development, groundwater and soils studies , transportation and
traffic analyses and a subsurface coring program to determine if ar-
chaeological significant resources exist on the site. The process and
schedule for conducting these studies and their relationship to the
current EIS and future actions by the City of Renton on the project
need to be more clearly outlined in the final statement. Based on the
number of additional studies and the significance of their scope, we
feel the rezone decision should be not be made until these analyses
are substantially completed. —'
Public Acquisition of Black River Woods Site
The EIS has understated the nu action alternative and potential for
public acquisition of the site, suggesting that because of the high
market value of the property and its designation in the comprehensive
plan for manufacturing park use the feasibility is unlikely. Current 3
studies underway as part of a County-wide parks and open space bond
program have recommended the Black River woods property as the third
highest priority wetland for acquisition under the bond program. The
site was originally recommended to the parks bond program by the City _
of Renton.
It is expected the bond issue will be presented for voter approval in
1982 with funds potentially available later in the year for site acqui-
sition. Public acquisition of the site is a potential alternative which
should be developed more comprehensively in the final EIS including a
detailed evaluation contrasting the benefits and impacts of such an al-
ternative with other development alternatives.
Balance Goals for Resource Protection and Economic Development
The proposed action and alternatives 1 and 2 which require removal of
from 67 to 80 percent of the riparian forest are inconsistent with many
of the environmental , open space and resource preservation objectives of
the City's recently adopted Comprehensive Plan--Policy Statement. Miti-
gation measures proposed to offset these adverse impacts are generally limited
to saving of significant trees and vegetation in undefined greenbelt areas,
implementation of a master landscape plan, and preservation of vegetation
in a 50 foot corridor along the Black River channel .
We do not feel these measures compensate for the detrimental impacts
the proposed action will have on the riparian forest which is acknow-
ledged in the EIS as unique, rare and the best remaining climax
-37-
Mr. David Clemens
May 29, 1981
Page 3
riparian forest in the Seattle area. The final EIS should clearly discuss
how the City's goals and objectives for protection and preservation of . �j-
unique natural resources have been balanced with goals for economic
development. —
SPECIFIC COMMENTS
pg. xiii The conceptual site plan should be corrected to show the flood
storage pond upstream of the P-1 pump plant in its present
design configuration. Preliminary land rights maps , including 6
proposed spoil disposal areas, are available from the Renton
Watershed Office of the Soil Conservation Service.
pg. 9 Park and recreation impacts fail to note the substantial re-
creation demand which will be created by the projected 4,100
employees who wi;; work at the business park.
pg. 19 The statement does not reference the Renton Parks and Recreation
Plan which cites the Black River Woods as "potential wetland" 7
or the Renton Wetlands Report which describes in detail the
unique ecological significance of the Black River woods.
pg. 48 The draft EIS notes that up to 70 percent of the surface top
soils will be displaced or covered by landfill as a result of B
the development. The final statement should discuss opportunities
for utilizing topsoils in landscaping and berming and the
potential for removing and stockpiling topsoil resources prior
to landfilling the site.
Low slope gradients to not guarantee that erosion will be minimal
during disruptive e:. avation, filling and construction activities.
Erosion and sedimentation control plans should be prepared for 9
the development, particularily due to the close proximity of
the site to the Black River channel and Springbrook Creek. _
pg. 55 The East Side Watershed project does not require that surface
runoff be removed from the site as quickly as possible.
Runoff controls are regulated by the City of Renton which re-
quire stormwaters to be retained on-site and released at a /0
natural rate incorporating natural drainage features (pg. 22) .
The final EIS should contrast the trade-offs between retaining
runoff on-site in retention ponds which could be developed as
site amenities and piped stormwater systems discharging directly —
to receiving waters as proposed for the project.
pg. 57 State Flood Control regulations do not require that lands in
floodplain areas be filled to accomplish flood protection, only II
that development be floodproofed above future flooding elevations.
-38-
Mr. David Clemens
May 29, 1981
Page 4
Landfill has been the conventional method of floodproofing in
the Green River Valley however, other alternatives are available.
pg. 60 The vegetation map is very general and not completely consis-
tent with the Renton Wetlands report and other existing field 12'
inventories. Further we do not agree that trees in this area
will tolerate a heavy layer of crushed rock and resulting soil _J
compaction.
Tree _inventories should be done in the context of site and open
space planning, considering opportunities to mass greenbelt
areas around important trees and other significant vegetation
or wetland areas. Saving individual trees without attendant
plant and soil support systems will not enhance the surviv-
ability of the trees or their significance as part of the
overall site plan.
pg. 81a Access to Monster Road to the west via a bridge across the pump-
ing plant outlet channel may result in a hazardous and ineffi-
cient intersection without substantial improvements to Monster
Road. Although the EIS suggests that Monster Road should be
upgraded, it should go on to discuss the specific improvements
proposed, a schedule for their implementation and how these
improvements will be funded.
The statement suggests an alternative westerly access from the
Black River site by extending the west perimeter road in
Earlington Park to the north. Such an extention would appear
to require a cross1og of the planned flood storage pond upstream
of the P-1 pumping plant which would be inconsistent with pro-
grams under study to enhance the storage pond for wildlife and 14
recreation purposes. The final EIS should clearly document
the need under any circumstances for a westerly access from the
site particularily for site plans which would concentrate
development on the eastern part of the site.
pg. 82 The mitigating measures proposed under fire services do not deal
with the impacts and concerns expressed by theFire Marshall in 15'
Appendix D; specifically, that "further development in this
area should be limited until such time as improvements can be _
made to provide timely first response capabilities."
pg. 85 Field inventories ari recreation analysis currently being con-
ducted for the East :Ade Project have not concluded that heavy
vegetation on the Black River woods site preclude opportunities /�
for passive forms of recreation. To the contrary, the site is
seen to have outstanding potential for scientific, educational
and interpretive forms of recreation with very minor site alter-
ations to improve access.
-39-
Mr. David Clemens
May 29, 1981
Page 5
Conceptual recreation plans for the East Side Project will be
• completed later this year. A significant component of these
plans will be recreation guidelines dealing with the relation-
ship of the East Side project rights-of-way with other adjacent
park and open spaces as well as trail linkages between Green
River parks and other facilities. Trail corridors through the
Black Ri"er woods and Earlington Park areas will be more
definitive at that time and hopefully can be incorporated into
site development plans.
pg. 88 The term "wetland treatment" needs additional definition. '
Discharging storm drainage immediately into the Black River
channel where residence time in a wetland environment may 1$
tend to enhance the quality of the water leaving the channel
should be compared with the effect such discharges will have
on the health and ecological viability of the wetland. —
pg. 109 Tables showing acreages for different uses and percentages
of expected site coverage for these uses under the several /9
alternatives are very confusing and not consistent with textual
descriptions of the alternatives describing how much of the
site will be developed and how much will be left in open space. —
Further, these acreages and percentages are not consistent ],zo
with one another throughout much of the EIS (e.g. , pg. 2,
pg. 15 and pg. 55).
The concentrated development alternative may not result in —
reduced building space and profitability if transfer of
development credits concept is applied. Alternative 2 should
be expanded or another alternative should be developed to
discuss such an option. —'
Thank you for the opportunity to review the statement. If you have questions
concerning our comments please feel free to contact Dave Clark at 344-7990.
Sincerely,
arold Robert on, Act. Mgr.
Pl a;:.li ng Division
HR:le
cc: Bob Edmundson,
County SEPA Coordinator
Herb Young,
Surface Water Management
-40-
Response to Comments from the King County Department of Planning
and Community Development
Comment Number: 1
The conceptual site plan for the proposed rezone action has indicated
that a 50-150 foot buffer preserved from development would be maintained
along the southern property line, which would ensure that the valuable
Springbrook Creek riparian edge would remain undisturbed. Also, see com-
ment 1 on page 19 of this EIS.
Comment Number: 2
This Draft and Final EIS are intended to address the environmental impacts
of the proposed rezone and the total proposal. Development parameters have
been assumed to permit reasonable analysis of impacts which may occur as a
result of development, although specific development plans have not been
developed. Specific site plans and detailed economic and groundwater anal-
yses, as well as tree inventories, and traffic and parking data will be
developed if and when site specific development plans are proposed. The
scheduling for the subsurface coring program will be decided by the City
of Renton Environmental Review Committee.
As noted in response to comment number 1, page 14, establishing the propriety
of a rezone proposal lies with the proponent. If the support provided by
the applicant and evaluated for its environmental impacts herein are insuf-
ficient, the proposal may be modified or rejected.
Comment Number: 3
According to Jeanette Veasey of the King County Parks Planning Department,
the King County Parks and Open Space General Obligation Bond Proposal is
tentatively scheduled to be placed on the ballot in Fall of 1982. However,
Ms. Veasey indicated that the riparian forest on the site is not included in
the acreage to be considered for acquisition.
Comment Number: 4
In as much as 78% of riparian forest will be removed, the proposal is not
consistent with the Balanced Development Objective. The proposal is gener-
ally a tradeoff between private gain as well as additional commercial and
-41-
I
industrial facilities for the city and the transformation of a natural
area. This tradeoff will be evaluated during consideration of the rezone
proposal and at further points in the review of specific site plans.
Comment Number: 5
Please refer to the conceptual site plan on page viii of the Final EIS '
for graphic depiction of the proposed P-1 storage pond in relation to the
site.
Comment, Number: 6
To reflect the concern raised in the letter from the King County Planning
Division, the following information is hereby inserted in the discussion
of "Parks and Recreation - Impacts," on pages 9 and 85. of the Draft EIS,
as follows:
"An increase in demand for recreational
outlets will be created on the site with
the addition of approxmiately 4,100 em-
ployees."
According to Mr John Webley, City of Renton Parks and Recreation Director,
there is no accepted set of standards for determining park and recreation
facility demand based upon projected employment. However, at the time
specific site plans are developed, the proponent will work with the City
of Renton Park and Recreation Department to develop on-site recreational
facilities in order, to mitigate demand generated by the proposed develop-
ment for existing off-site recreational facilities. (Source: Telephone
conversation with Mr. John Webley, Director. of Parks and Recreation for
the City of Renton, March 11, 1982.)
Comment Number: 7
For a discussion of the Renton Wetlands Report please refer to the
response to comment 8, letter from the U.S.D.A. Soil Conservation
Service on page 11 of the Final EIS.
The following discussion of the City of Renton Comprehensive Parks and
Recreation Plan is hereby inserted into the Draft EIS on page 44 as
follows:
-42- .
"This document contains an inventory and
evaluation of existing recreation condi-
tions by geographical area, as well as
recommendations for future acquisition
and development of parklands. Specific
• to the subject proposal, a graphic on
page G-15 of the report indicates that a
portion of the subject site is desig-
nated for acquisition as wetlands. On •
page H-1 of the Plan, the Summary of
Recommended Acquisition Priorities ranks
wetland acuqisition as the fourth prior-
ity. According to the Plan, $400,000 was
budgeted for wetland acquisition for 1980.
None of the budgeted funds have been allo-
cated to purchase of the Black River forest. "
Comment Number: 8
According to the project soils engineer, the topsoil on the site
is intended to remain to serve as a mat separating the fill and
construction machinery from the silty fine sand underneath, which,
if disturbed, would turn to unsupporting mud.
Comment Number: 9
On pages 3 and 56 of the Draft EIS, it is suggested that temporary
storm water detention and settling facilities be installed during the
construction period to collect silt and minimize turbidity. This mi-
tigation may be required as a condition of project approval, in which
case, the developer will install the facilities. This EIS has addressed
the impacts of the rezone of the site from General Classification (G)
to Manufacturing Park (MP) . When specific development plans are proposed,
supplemental environmental analysis may be required in accord with the
SEPA guidelines. At such time, engineering information and details re-
sonable related to the proposal's definiteness will be prepared.
Comment Number: 10
It is the intention of the designers of the East Side Drainage Project
and consistent with the City of Renton policy that storm water runoff
be discharged from the site to the P-1 pump station as quickly as pos-
sible before the peak flow from upstream reaches it. The proximity of
the subject property to the P-1 Channel precludes the need for on-site
-43-
•
storm water detention, subject to previously discussed provisions to
insure discharge water quality.
Comment Number: 11
Comments noted.
Comment Number: 12
A review has been made of the various existing studies of the vegetative
character of the subject property and it was concluded that the discrep-
ancies between them are not of sufficient, magnitude to affect the con-
clusions respectively drawn. If rezoning of the site is granted, more
specific analysis will be provided regarding the compatibility of the
riparian vegetation with the precise development proposal.
Comment Number: 13
As indicated in the response to comment 2, above, when specific site devel-
opment plans are proposed following granting of the rezone, then supple-
mental environmental analyses, including a tree inventory, may be required
by the Renton Planning Department pursuant to the SEPA Guidelines.
-44-
Comment Number: 14
It is intended that Monster Road be improved to a minimum two-lane
roadway with no parking. Right-of-way should be retained in areas
where there are existing or possible intersections with driveways and/
or streets to permit the addition of auxiliary turning lanes where
traffic volumes warrent.
The funding for any of the improvements outlined is intended to be
based on a proportional use formula. The costs of improvements to
any connection with Monster Road and/or extension of the roadway along
the west side of Earlington Park should be allocated in proportion to
the peak hour traffic volumes generated by this proposal compared with
the peak hour traffic volume using the section of road that is improved.
Thus, costs would be allocated in proportion to the benefit received.
Because of the wide range of potential volumes that could use this road
(because of the wide range of development potentials for this and other
parcels in the area) , it is impractical to specify a precise proportion
at this point. It is suggested, therefore, that at the time a more re-
fined development is planned for this site, the detailed traffic analysis
and traffic assignment be used as a basis for determining the appropriate
proportion of costs. Final determination of funding will be negotiated
with the City using the proportional use formula as a basis.
The westerlyconnection could divert upto 25 percent of the traffic
generated by the Black River Office Park and a like percentage of the
traffic generated by Earlington Park. This mitigating measure is recom-
mended since diversion of travel to the west would tend to slow down
traffic growth on Rainier Avenue, I-405, and Grady Way. Such an improve-
ment would simply decrease the length of the peak period in the vicinity
of the project. This improvement would not eliminate nor result in an
improved level of service on these routes since conditions already
operate at LOS E (capacity) .
-45-
Comment Number: 15
Please refer to the added mitigation to offset fire protection
impacts, stated as the response to comment 1, letter from the City of
Renton Fire Marshall, on page 49 of the Final EIS.
Comment Number: 16
To reflect the concerns of the King County Planning Division response
letter, the final sentence of the discussion of "Parks and Recreation -
Existing Conditions," on page 85 of the Draft EIS, is hereby revised
to read as follows:
"The site is presently heavily vegetated,
which precludes any opportunity for trad-
itional \ forms of active recreation, but
would support scientific, education and
interpretative forms of passive recreation
with minor site alteration to improve access."
Comment Number: 17
Comment noted.
Comment Number: 18
Please refer to the response to comment 5, letter from the Seattle
District Corps of Engineers, on page 6,, and U.S. Department of Interior
eouunent 3, -page 19 of the Final EIS.
Comment Number: 19
A comparative review of the information contained within the text of
the alternatives discussion on pages 109-111 and that on Table 10 on
page 112 of the Draft EIS does reveal discrepancies between them. To
correct the inaccuracies, the text of the respective alternatives is
hereby revised to reflect the percentages listed on Table 10 entitled
"Comparative Analyses of Alternatives,"
-46-
Comment Number: 20
To correct the inaccuracies in open space and riparian forest calculations
the following revisions are hereby made: The initial sentence on page 2
of the Draft EIS is revised to read as follows:
"Development of the proposal will necessi-
tate removal of 46.11 acres of the 59.5
acre riparian forest located on the site."
Also, the sentence describing "Flora - Unavoidable Adverse Environmental
Impacts," on page 15 of the Draft EIS is hereby revised to read as
follows:
"About 77 percent of the natural riparian
vegetation on the site. would be removed."
This impact would be partially offset by the introduction of landscaping
on the project site.
Comment Number: 21
An additional alternative depicting concentrated development has
been included in this Final EIS, as depicted on the conceptual site
plan on the following page. Project design would include the replace-
ment of scattered smaller structures with three larger, 6 to 10 story
structures. The height would be determined in part by the adequate
ratio of parking which could be installed on the site with this
alternative. This alternative would result in 29% of the site being
developed with 24.7 acres (42%) of the riparian forest preserved from
development. The largest nodes of preserved riparian forest vege-
tation are illustrated on the site plan. These would include areas
of : Node A = 9 acres
Node B = 6 acres
Node C = 5 acres
The remaining 4.7 acres are included in smaller lineal connections
between the more prominant nodal areas. The feasibility of this alter-
native depends upon future construction costs and market conditions.
-46a-
. ,
• . .
, • ,
. . .
. ,
. . -
. . .
• *... :.L
A•-
t K RIVER
0FFICc
. PARK
_ RW.THORPE AND ASSOCIATES
4.-011117,'\. ,
nn. ...1 . ..
. ,11-c::::3 II (12=P=3 ll cozem 4 --41111%11b o 100 400 .- BOO NORTH
• ..a.eib p .,.....,•!_r• ''' _ ab",z . 4/
i .
..e6
--"-' 01.- ' Et••
,a • "VA.1.,,o .._
104 •
-.]
4:11:°:zoLiv:°-.4`to,1 ' -••- .."' . :74":07:e.t:1:1..;*111111.".1e.ii l'a):1[11111
1 j
En: 1 4*z.,. —op.:.
•L 6.'7..44% .) ..•• • ei- '6
1140 0 •7.:- / A • akb ---, • .
O 3 • .. a oil
-.•:/,-ar. A •ite T-444.:-..‘.!;":,,.,
Ititi.,(14° . • ..; , , . •ig,1117.1
et, ------ .- --- , ...:...:7.7 ---- '-`111444 .____ etat,"•11'a
• xi NM (sir 0 -Krniam roaraikam-••..A..::/ _.;,..,.._. .--• a • ... , .kr.:-.__.-____
V D • ":-;-1 1, 0.dailt•co•oralitS •1117.
P.,.,' 'Aztrs" ' • Item .- .•••• aNialfdireemeo, ' , •
Adkcai t.-.. .,:+z,
eaia) ''.• - • •PAP,4.::-..•'40(, )
M IV MIMI ../1
—-----.. . ..4!. '.I. 1011 i pRfOVELOpMENT
.0) .
I 1111"- P-/caup,,,L
-.......„. .1
I 1
-.----..
''
a •
M A .
M •
STORIES
01• M -it .
n 2 0
. . • _ - _
.4 ... „, . . •
• m < III . •
w M A . . .
•
_ .
•
• ,
mr.". o.i rr�.ci
•
f FROM THE DESK OF 4/3/81
J I M MATTHEW
FIRE MARSHAL
TO: Dave Clemens, Acting Planning Director
RE: Black River Office Park Rezone
Dave,
•
I have reviewed the draft document for environmental impact on the above named
project. Its impact is very similar to that of the Earlington Park Project.
To look at one requires considering the overall effect of the total development
in the area and its impact on present city services.
The mitigating measures expressed on page 82 do not demonstrate how the developer
plans to provide the necessary fire services for the area. Our concerns are in
regard to site access and timely response to the area. The present site access
is limited to essentially a one-way response from the main station at South 2nd
and Mill Ave So.. It cannot be assumed that the response will always come from
the station, since many times the equipment is in the district on inspection and
detail. Access to the proposed development from the north is restricted by nat-
ural and man-made barriers. The steep hillside and railroad right-of-way prohibit
travel directly from the north. Trucks on detail in the north would have to back-
track through Renton in the event of an alarm,in a building located in this de-
velopment.
The private fire protection proposed is an important aspect of the project but
it cannot completely substitute for a .basic fire response. The need for addition-
al fire facilities located in the valley presents itself with this development.
The purpose of the SW 19th and Lind Ave S. W. side was dedicated just for this
purpose. Mitigation of the response time problem.could be accomplished by the
construction of a station at that site, providing an engine company staffed on
a 24-hour basis with 3 personnel. •
Consideration should be given now to providing a method of funding and timetable
f r'-` nstruction of this station.
V;;;1.--2
//)i' ,ill
/JAMES F. MATTHEW'
Fire Marshal .
•
JFM/wp
-AP-
Response to Comments from the City of Renton Fire Marshall
Comment Number: 1
In order to incorporate the concerns of the Fire Marshall regarding
the lack of available fire protection services to the proposed
development, the following mitigation is hereby added to the lists
on pages 8a and 83 of the Draft EIS, as follows:
"The community facilities charge established by
the City will in part provide for future fire
station improvements. As a result, other sources
of capital funding will be required, in addition
to the recurring annual costs of personnel and
similar services."
Comment Number: 2
The project is proposed to be constructed in two phases with
Phase 1 accessed by a single road connecting to the road system
to serve the proposed Earlington Park development adjacent to the
south of the site. Phase 2, on the western portion of the site, will
connect to the Phase 1 road system and also be served by a secondary
access to Monster Road across the P-1 drainage channel. Thus, at
project completion, the total site would be served by roads extending
to both the east and west. Also, please refer to the response to
comment 1, above.
-49-
OF R4,4,
THE CITY OF RENTON
U ®10 MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON.WASH.98055
m • BARBARA Y. SHINPOCH. MAYOR ® POLICE DEPARTMENT
(c, HUGH R. DARBY. CHIEF
.o P
*4-0 SEP1 040
MEMORANDUM
•
March 31 , 1981
TO: Dave Clemons, Planning Department •
FROM:. Lt. Don Persson
SUBJECT: BLACK. RIVER OFFICE PARK
This development will have an impact on police services in three area that are
not adequately addressed in the preliminary impact statement. They are:
(1 ) Traffic Problems
Every roadway into the area is currently operating at its peak level .
The addition of phase one of this project without the completion of
the entire roadway system needed for both phase one and two would put
a burden on the roadway system that would generate numerous traffic
collisions and traffic tie-ups. This would dictate additional traffic
enforcement and traffic accident enforcement in the area that would
put an additional burden on the. Renton Police Department Traffic
Division. Thus, it is imperative that the entire roadway system for
both phase one and phase tHo be built prior to any construction.
(2) Police Services
Since the initial questions were asked ', the police department in
regards to the impact of this development, several other projects
within the city have been started or completed.. Due to these projects,
this development will have a major impact that cannot be adequately
handled without some mitigating measures such as: (1) all buildings
in the area be prewired for intrusion alarms; (2) exterior lighting
be placed so it shines in on the building rather than being placed
on the building shining outward. Exterior lighting, when placed on
the side of a building so that it shines outward blinds the police
officer who has to respond to the business during the hours of darkness.
(3) dead bolts installed on all doors; (4) large, easily readable
building numbers on all buildings; (5) no excavation work on Saturdays
or Sundays unless the contractor hires an offduty Renton Police officer
-50-
MEMORANDUM - Page 2
to monitor the overweight and tracking violations that are generated
from this type of operation.
(3) Noise
The department's concern on noise generated from this type project is in
two areas. (1 ) Construction Noise. The hours of construction should be
regulated from 7:00 am to 7:00 pm, Monday through Friday, 10:00 to 4:00
pm, Saturdays and Sundays. Further, the construction workers should not
be allowed to play their stereo systems on the job site as they try to
have their stereo systems louder than the construction equipment, which
generates numerous complaints from residents in the area.And this particular
area will be a problem due to its closeness to Burlington Hill and the new
housing development being built behind Sears. (2) Railroad crossings should '
be of the new rubber type to reduce the amount of noise when cars and trucks
pass over the crossings late at night.
DRP:bf
•
-51-
Response to Comments from the City of Renton Police-Department
Comment Number: 1
It is acknowledged that much of the road system currently operates
at capacity. However, not all intersections nor all road sections
operate at this level. It is also acknowledged that there is likely
to be an increase in the number of accidents resulting from the in-
creased traffic volume that would be generated by this and other
projects in the vicinity. While it is a general rule that the
traffic accident rate increases once a roadway operates at or beyond
capacity, the traffic accident history in the vicinity of the project
does not support this generalization. Based on several years of
traffic accident history data, the traffic accident rate has been
equal to or less than the rate of increase in traffic volume. The
creation of the road system west of the site is not expected to meas-
urably reduce the number of accidents that would occur as a result of
this project; rather, it will simply shift the location of where
those accidents might occur.
As stated in the Traffic Analysis in Appendix B of the Final EIS,
because many of the intersections in the site vicinity currently
operate at capacity and because relatively little can be done to
increase the capacity of these intersections and/or freeway, there
will be several impacts associated with this or any new development
in Renton:
*Capacity conditions at key locations will extend
over longer periods of time such that hour-long
capacity conditions today may extend for more than
one hour in the future.
•People will seek alternative routes to avoid.
congestion.
-Some people may shift their mode of travel to
transit or may choose to carpool, vanpool, or fleet
ride to and from work.
-52-
Recommended mitigations for congestion are described in the discussion
of "Vehicular Transportation Generated - Mitigating Measures," on
pages 7-8 and 81a of the Draft EIS. In addition, the following miti-
gation is hereby added to the list on pages 7 and 8 of the Final
EIS as follows:
•The City could- encourage the use of alternative
modes of transportation by installing paid parking
areas, reducing the parking supply, and designating
a portion of the lot for carpool use."
The developer shall provide an operational traffic analysis for each
phase of development when specific site plans are available.
As indicated on page 2 of the Traffic Analysis. in Appendix B of
this Final EIS, during Phase 1 all project traffic will enter and
exit via the Earlington Park development to the south. It is, there-
fore, not considered necessary to construct the complete roadway system
prior to construction of Phase 1 of the proposed development.
The developer will participate in street and intersection improvements,
including the intersection of Monster Road and Sunset Boulevard,
Monster Road and the roadway to be constructed along the western peri-
meter of the Earlington Park development, paralleling the alignment
of the proposed Valley Parkway. There may be other traffic operation
improvements which may be made at some intersections in the vicinity of
the project. However, such detailed improvements can not be reliably
forecast because of the wide range of development potentials for the
project. Such detailed analysis will be provided at the time a more
specific proposal is developed. Please refer to the letter from Mr. , -
Richard Houghton, Renton Public Works Director, on the final page of
this Final EIS. -
-53-
Comment Number: 2
To reflect the concerns of the Police Department comment letter, the
lists of mitigations regarding police protection on pages 8-9 and
83-84 of the Draft EIS are hereby expanded to include the following:
" - All doors should be equipped with dead bolt locks.
- All buildings should be prewired for intrusion alarms.
- Indirect exterior building lighting should be utilized.
- Large, easily-read numbers should be placed on all
buildings.
- No excavation work should be conducted on the weekends."
Comment Number: 3
The suggested mitigations involving construction hours and rubber-
ized railroad crossings have been included already on pages 5 and
72-73 of the Draft EIS. To reflect the concerns of the Police
Department comment letter, the following mitigation is hereby added
to the lists on pages 5 and 73 of the Draft EIS:
" - The volume of radios and stereo systems utilized
by construction workers should be restricted to
a level which does not intrude upon nearby resid-
ential uses."
-53a-
WRITTEN COMMENTS FROM NEIGHBORHOOD RESIDENTS, COMMUNITY GROUPS,
AND OTHER INTERESTED PRIVATE PARTIES AND RESPONSES TO COMMENTS
•
•
aLF��3 t;51 "rlkt.+��Q.,AM
(7. . j
, r,y1,t4.4, ,,k, :;'4
;7
b 1,, •
LCL
rw
= „*��� . A'Washirigtar Chapter of National Audubon Society
L 619 \) r \•
;, '* .V '
' �, � wog Joshua Green•Sui dIr • .�Pourth Avenue and Pike St., Seattle. Wash. 98101 • (206) 622-6695
-5,44,160, tr: ,' ...) r',"1
. ,*4.,1,ViMeito , .>AP . 1 - }-- i
`. ,;�:/, April 28, 1981
ia
David Clements . ••,. ! ,r• ,-
Acting, Planning Director •'
City of Renton Planning Dept.
Municipal Building
200 Mill Ave. So.
Renton, Wa. 98055
Dear Mr. Clements,
Thank you for the opportunity to comment on the DEIS for
the Black River Office Park. On behalf of Seattle Audubon,
I must say it was discouraging to see this document so soon
after Renton' s very commendable Wetlands Study; and its rec-
ommendations. More on this later in the letter.
The Black River Office Park DEIS is generally clearly
written and adequate in meeting SEPA guidelines.. however, two _
parts of the statement should be strengthened. In the alter-
native section, alternative two of a lower intensity develop-. f
ment is hardly analyzed at all. Certainly some pros and cons of
such an alternative development scheme should be .addressed. —
Secondly, the hydrologic analysis leaves. many questions unan-
swered. Where does the water in the Black River forest come
from--overflow of the Black River channel-Springbrook Creek, 2
groundwater seepage, or gravity flow from Earlington Hill to the
north? What is the yearly or seasonal fluctuation of water
levels on various parts of the site? At the very least some
site testing as included in Appendix B should have been dis-
cussed,. and such sites monit;.red over several months ' time. .
The property is an important wetland which provides consider-
able flood storage , and the riparian forest species (notably
the Oregon Ash and Black Cottonwood) are dependent on high
. water levels for most of the year.
Although the idea of leaving some of the site undisturbed
. is a' good one,; it is very unlikely such a small tract (13 acres) .
will survive as riparian forest. On page 19 of the Renton 3
WetlandsStudy, it states, " . . .at least 40 acres of wetland in one
contiguous block would have to be retained in its natural con-
dition in order for the riparian forest to continue as a func-
tioning habitat. " If a large part of the natural wetland is —
filled, then what remains will slowly but surely die off. To
• preserve the uniqueness of the riparian forest, the site itself •
must be mostly preserved.
The proposed re-zone of the site to M-P would contradict
most of the natural systems goals of the 1981 Renton Policy .
•
—54—
2 .
Element (see pp,19-2L in EIS) . Furthermore, the Black -
River woods were identified in the 'Renton Wetlands Study as
the number one wetland area for preservation. The woods have
a tremendoiis present value for flood storage and as a green-
belt or urban separator. They provide homes and resting
places for many wildlife species, and serve as a close-in
• "outdoor laboratory" for education and scientific study..
Surely greater Seattle will need more offices and busi-
ness parks, but at what price? On page 102 the EIS preparers.
admit,. "Implementation of the proposed project will convert'
the best remaining riparian forest in the Seattle area to a
warehousing/office park. " Surely alternative sites are avail-
able for such facilities at a lower environmental cost than
the loss of the Black River Forest,.
Please notify us of any .public hearings about the re-zone
of this property, to my attention,,
Sincerely yours,
• Jed iiarshall
Seattle Audubon Wetlands
Committee
•
•
•
-55-
Response to Comments from the Seattle Audubon Society
Comment Number: 1
Comment noted. The discussion of the impacts of Alternative 2
on page 110 of the Draft EIS in relation to those of the proposal
quantifies the differences between the two development options.
The major benefits of a less intensive alternative are enumer-
ated in the impacts discussion, whereas its major drawback in-
volves its economic infeasibility.
A modified alternative has been added to the Final EIS and is
discussed in the response to comment 21, letter from the King
County Department of Planning and Community Development, on
page 46a of the Final EIS.
Comment Number: 2
The consulting firm of Entranco Engineers has conducted a Drainage
Analysis, the results of which are included as Appendix D in this
document. The local storm drainage patterns are detailed on page 7
of that report.
Comment Number: 3
Short-term retention of the site in its undeveloped state will be
addressed as part of the rezone approval (see the response to comment
1, on page 14 of this document.) The City could also be constrained
from allowing development if the environment is determined to be signi-
ficantly adversely affected by such development. According to the City
of Renton Planning Department, long-term preservation of the site in its
natural state could provide the City an opportunity to purchase and/or
encourage dedication of portions of the property for public ownership
by the property owner.
-56-
Comment Number: 4
Comment noted. The proposed action, which would be consistent with
the land uses proposed to the south of the site, may be considered as
"in-fill" growth in that it is located in close proximity to an urban
center. It is acknowledged, however, that about 1,000 acres in Renton
presently zoned for Manufacturing Park already feature or are currently
developing street access and utilities necessary for industrial devel-
opment of this type. As stated on page 97 of the Draft EIS, the •site
is unique as one of two sites in the Valley equipped with reciprocal
switching from two railroad lines without penalty to the shipper, in
most cases. The light warehousing use proposed for the site would
take advantage of this feature.
•
-57- -
•
•
GREEN RIVER STUDY GROUP P.O. Box 772, Kent, Wash. 98031 •
a �-- May 26, 1981
Mr. David Clemens, Acting Planning Director
City of Renton Planning Department
Municipal Building
200 Mill Avenue South
Renton, Washington 98055
I have reviewed the Black River Office Park DEIS -and I am primarily con-
cerned about the impact of this project on a unique wildlife habitat. I am
also concerned about the effects on traffic of this development and others
planned for this area.
The Black River Office Park is to be:built on a 70 acre parcel that is
a unique example of a climax riparian forest. According to the City of Renton
Wetland Study (February, 1981), the Black River Forest is "the most valuable
wetland within the City".(pg. 11) According to the DEIS (pg. 63) "this tract --
of wetland remains for both wildlife and plants an especially large, mature
and varied habitat, considering its urban location. As such, it is one of the
only habitats suitable for certain species in the Seattle metropolitan area."
Admittedly the proposed development will attempt to leave 22% of the native
vegetation in large areas, particularly along the Black River. But, according
to the informationon page 61 of the DEIS, the trees in this area areaall
shallow rooted and will not survive the soil compaction from heavy traffic or
paving. These trees areaalso susceptible to wind damage, and the thinning
and clearing during development will magnify the wind damage problem. It seems
clear that the efforts to mitigate the impacts of development on the Black
River Forest are of questionable effectiveness.
Any development on this site will destroy a unique and irreplaceable
habitat, and there is no way to mitigate its loss.
The impact of the area's transportation system is clearly negative.
The development will generate between 9,070 and 34,030 vehicles per day in
an area where the LOS is E to F at the present time. (At no point in this
DEIS did I see LOS ratings for the affected arterials and intersections.
My information comes from the Earlington Park DEIS.) When the traffic from this project is combined with that of other developments in the area, the
increase in truck and automobile traffic will be substantial. People will
surely seek alternative routes to avoid congestion, but the aternatives in
this area are few. Unfortunately, there is little that can realistically be
done to improve the capacity of efficiency of I-405, Grady Way, or Rainier
Avenue. The already severe congestion will get worse, -
-58-
Black River Rorest Office Park DEIS
Page 2
GREEN RIVER STUDY GROUP P.O. Box 772, Kent, Wash. 98031
�,� � irk
Improvements to Monster Road are recommended as a way of mitigating
the traffic impacts. How riill these improvements be funded?
The Black River Forest is a unique, beautiful natural area. I urge
the City of Renton to delay any development on this irreplaceable site
until methods of preserving this area can be explored. Since this site 3
is being considered as a regional priority in the proposed County bond
issue, it would be reasonable to preserve the area until the bond issue
can be decided.
Sincerely,
Carol Stoner
1 • �vL
•
•
i
-59-
•
Response to Comments from the Green River Study Group
Comment Number: 1
Comments noted. .
Comment Number: 2
These issues are discussed in an expanded traffic analysis, the
full text of which has been included in this document as Appendix
B. The congested levels of traffic flows in the site vicinity as
well as mitigations are detailed on pages 2 through 5 of that report.
An explanation of the proposed method of funding may be found in the
response to comment 2, letter from the Washington State Department
of Transportation, on page 25 of the Final EIS. See also the
response to comment 1, on page 52 of the Final EIS.
I
I
Comment Number: 3
Please refer to the response. to comment 1, letter from the United
States Department of the Interior, on page 14 of the Final EIS. '
•
•
-60-
ALHADEFF, LEAVITT, WESLEY & B OPP
ATTORNEYS AT LAW
ALAN C.ALHADEFF THIRD SC BLANCHARD BUILDING TELEPHONE
GERALD L.UOPP 21J4 THIRD AVENUE - (2O ) GO -4.1193..
STEPHEN H. POWELL SEATTLE,WASHINGTON 98121
R.JOSEPH WESLEY
JON R.ZULAUF
THOMAS E.LEAVITT
ON LEAVE May 28 , 1981
of EivF?Ek-bitt
ie
r
AY 29 1981
Mr. David Clemens "Acting Planning Director • 4i 4`
City of Renton \ 41/N •
Planning Department
Municipal Building
200 Mill Avenue
Renton, Washington 98055
Re: Black River Office Park Draft
Environmenta.l Impact Statement
Dear Mr. Clemens:
This letter will serve as the comments of our
client, the Duwamish Indian Tribe on the Black River Environ-
mental Draft Impact Statement.
Our client' s primary concern regarding the rezone
and ultimate development of the office park and rail-served
warehouse is the impact such use will have on the Indian
archaeological sites in that location. The assessment done
by the Office of Public Archaeology of the University of
Washington appended to the draft EIS is an excellent first
step toward proper protection of this property. It is our
position, however, that further studies need be done as
recommended by the Office of Public Archaeology prior to the
final EIS and, of course, prior to the actual rezone.
Unless full information is obtained on this issue,
a final EIS would never be determined adequate under state
law.
The Washington Supreme Court has recognized the
adoption of the State Environmental Property Act (SEPA) as
"an attempt by the people to shape their future environment
by deliberation, not default. " Stempel v. Department of
Water Resources, 82 Wn.2d 109, 118 , 508 P.2d 166 (1973 .
SEPA, therefore, "mandates governmental evaluation of environ-
mental factors when choices are still available" . Eastlake
Community Council v. Roanoke Assoc. , 82 Wn. 2d 475, 496, 513
P. 2d 36 (1973) .
-61-
Mr. David Clemens
May 28 , 1981
Page Two
Further stressing the importance and function of
this informational purpose, +.he Supreme Court has declared:
The clear mandate of SEPA, and the purpose
behind the environmental impact statement
requirement, is consideration of environmental
values based on full information before a
decision is made . . . one of the purposes
of this complete information requirement
is to help the agency decide what protective
conditions are needed.
Norway Hill v. King County Council, 87 Wn.2d 267, 279, 552
P. 2d 674 (1976) (emphasis in original) .
We do not feel that a deferral of a full and
proper analysis of this impact until the construction stage
of this project is proper under the law. Case law in
Washington requires full assessment of known impacts at the
earliest stage possible. This rule is imminently reasonable j -
in the instant case. The City has been asked to rezone the
entire site but it has the. choice of rezoning just part of
the property (see p. ix of EIS) . Until the actual location
of archaeological sites are known, the City cannot make a
reasoned decision about what part of the site should be left _
in its natural state.
The means for such further assessment - subsurface
coring - is available now, as acknowledged by the EIS. To
defer complete analysis would make the EIS inadequate and
any rezone decision improper.
While we focus on this particular impact, we
concur with those comments which we know you will receive
regarding the project' s efi-^t on the physical environment.
The removal of the riparian forest, displacement of a unique
wetland, and detrimental effects on groundwater and surface
water quality are all significant impacts of this project
which should be fully considered by the City before taking
this first step of rezoning.
-62-
•
•
Mr. David Clemens
May 28, 1981
Page Three
Finally, the Duwamish Tribe was not listed in the
Draft EIS as a recipient of the document. Please add them,
in care of this office, so that we may receive the final
EIS and notices of public hearings.
•
. Thank you.
Sincerely,
ALHADEFF, LEAVITT, WESLEY & BOPP
•
By: .%/ / ) / / ,
Alap' C. Alhadeff//
L• �
By: s'l._6 f L�r l-cJ-t�'J�-'L...
Stephen R. Powell
SRP/ldf
cc: Ms. Linda Littrell,
Small Tribes of Western Washington (STOWW)
Ms. Cecile Maxwell, C :airperson, Duwamish Tribe
Ms. Lisa Steinbrueck
Office of Public Archaeology
•
•
•
-63-
Response to Comments from Alhadeff, Leavitt, Wesley & Bopp
Comment Number: 1
As stated on page 96 of the Draft EIS, the proponent will authorize
a coring program prior to the commencement of construction activities,
If significant archaeological resources are discovered on the site,
conditions of either the rezone or future development may require
protection of these resources through alternative site design or
retention as open space until excavation of such resources can be
completed. Please also refer to the response letter from the Washing-
ton State OFfice of Archaeology and Historic Preservation, on page 70
of this document.
-64-
r !\ ! r ,
l 1
•
•
•
4
City of Kenton Planning Dept. ,� May 27, 1981
200 Mill Ave. S. Box 161
Renton, Wash. 98055 r Renton, Wash.
• 98055
Subject: EIS Proposed Black River Office Park
I have read the EIS for the proposed Black River Office Park and believe •
that any benefits that the public might derive from this project are far out-
numbered by the adverse impacts which are certain to occur. The mitigation
outlined in the EIS does not show that the environmental damage can be re-
duced to an acceptable level. That was the conclusion of the traffic analysis
(D-8) as well as the vegetation and bird report (C-3) and the comments from the
Renton Fire Marshall (D-5).
Only Alternative 3 will retain riparian forest habitat in an .mount large
enough to afford significant protection of its unique qualities and this altern-
ative was given little discussion,. Acquisition of this property for a public
park was dismissed as unlikely, however, that remains a very viable option, • j
The uniqueness of the Black River forest is well-recognized and the fact that
the site remains high on a list of priority projects for a proposed County Parks
and Open Space bond issue should not be ignored; nor have other funding altern- _
atives been thoroughly explored.
The recent Renton Wetlands Study indicates that a minimum of 40 contiguous
acres of wetland must be preserved in order for the riparian forest to retain its
current habitat functions, The EIS fails to relate the probable .long-term im- 2-
pacts of partial development, whatever the scale, on the ability of any preserved
areas of forest to survive. Recommendations on page C-3 seem to conflict with
those of the soil report which indicate that extensive filling and an extensive
surface water and ground water drainage system will be necessary.
The issue of water quality is liCztly considered,.and cannot be isolated
from that of adjacent projects, as yet uncompleted, whose runoff will also be 3
directed into the Black River channel. The ability of the small wetland area
to accept and adequately treat an unlimited volume of runoff must not be assumed. _
The potential revenues to the City were cited as an economic benefit but no
figures presented to show how these might offset added public costs necessitated 4
by development of this land. Is there certain funding for the major road im-
provements that are discussed? Will police and fire .safety be reduced in other
areas of the City?
How might the proposed westerly access to this development for mitigation . — 5
of some traffic impacts affect preservation of the western half of the site should
alternative 2 be chosen? •
. There seems to be general agreemen-o among the various governmental bodies
that a buffer zone of 200 feet is needed to afford some protection to a river Cv
environment. What is the justification for this proposal's setback of 50 feet
along the Black River channel?
•
-65 •
-
Page 2 EIS response
There continues to be an abundance of undeveloped valley land which is
already properly zoned for industrial purposes and where improvements, includ-
ing rail, already exist. The demand for rail-served warehousing can be full- -7
filled elsewhere and, in fact, is planned elsewhere including a site adjacent
to the subject property. These sites should be utilized before additional lands
are rezoned for the same purpose.
The City's Land Use Comprehensive plan dates back to the 19601s. Since
then there have been several studies of the Black River forest which indicated '
its unique features as an environmentally sensitive and historical area, a fact e5
not earlier recognized. The new Plan .. visions proposed by the Planning Com-
mission for this general vicinity indicate that reduced density of development
and additional greenbelt area may be more appropriate. -r
The EIS accurately notes that this proposed rezone represents a signifi-
cant change in land use--replacement of one-of-a-kind old growth riparian forest
with an office park/warehouse complex now increasingly familiar in our valley.
Perhaps no other area remains on the valley floor where such a rezone could
effect such a profound alteration of the environment. Attempts to preserve a
portion of this sensitive forest habitat are not guaranteed of success. The
balance of development and preservation of open space that is sought is best
achieved by allowing this property to remain a part of the open space network
proposed for the valley floor.
Sincerely,
/>
Lauri Johnsen
•
•
•
•
•
•
•
•
•
_F�_
Response to Comments from Lauri Johnsen
Comment Number: 1
Please refer to the response to comment 1, letter from the United
States Department of the Interior, on page 14 of the Final EIS.
Comment Number: 2
The discussion of "Flora - Impacts," on page 63 of the Draft EIS,
which is condensed from the full discussion on page C-3 of Appendix
C, does acknowledge the risk of partial development on the remainder
of the riparian forest. It is noted that gradual losses and elim-
ination of certain plants and species would likely occur.
Comment Number: 3
The issue of water quality and wetland treatment for this and other
proposed development in the immediate' vicinity of the subject site
has been addressed in the Water Quality Impact Assessment completed
by the consulting firm of Entranco Engineers. The full text of that
analysis has been included in this document as Appendix A. As dis-
cussed on page A-3 of that report, the use of oil/water separators,
in conjunction with the proposed wetland treatment, gabion structures,
and frequent street cleaning, should result in sufficient water qual-
ity treatment so that no discernable degradation should occur to
Springbrook Creek.
Comment Number: 4
Please refer to the response to comment 2, letter from the Washington
State Department of Transportation, on page 25 of the Final EIS for
a discussion of the proposed method of funding transportation improve-
ments. Refer, also, to the added mitigation to offset fire protection
impacts, stated as the response to comment 1, letter from the City of
Renton Fire Marshall, on page 49 of the Final EIS. In addition,
-67-.
Comment Number: 4, continued.
several mitigations have been added in response to comment 2, letter
from the City of Renton Police Department ( on page 53a of this docu-
ment) , intended to reduce potential impacts on police protection
services.
Comment Number: 5
It is acknowledged that the mitigating measure to build a roadway
connection to Monster Road would have some impacts on the preservation
of vegetation on the western half of the site, since either a direct
connection to Monster Road or the extension of the roadway along the
west side of Earlington Park would need to cross certain drainage areas
and would temporarily disrupt the flow of water to vegetation in this
area. The extension of roadways and utilities into the westerly portion
of this site could also precipitate future development in these areas,
thus reducing the size and value of the remaining riparian forest.
Comment Number: 6
As stated on page 43 of the Draft EIS, the Washington State Shoreline
Management Act applies to the areas 200 feet from either side of the
Black River Channel, measured from the ordinary high water mark. The
SMA regulations restrict the type of development permissible within
certain distances from designated water bodies. However, they do not
prohibit development within 200 feet of the Black River Channel. The
rezone approval, Substantial Development permit (SMA regulations) and
site development permit can be conditioned upon preservation of vege-
tative buffers adjoining the Black River Channel.
Comment Number: 7
The proposed action, which would be consistent with the land uses pro-
posed to the south of the site, may be considered as "in-fill" growth
in that it is located in close proximity to an urban center. It is
acknowledged, however, that about 1,000 acres in Renton presently zoned
for Manufacturing Park already feature or are currently developing street
-68-
•
• Comment :lumber: 7, continued.
access and utilities necessary for industrial development of this type.
As stated on page 97 of the Draft EIS, .the site is unique as one of two
sites in the Valley equipped with reciprocal switching from two railroad
lines without penalty to the shipper, in most cases. The light ware-
housing use proposed for the site would take advantage of this feature.'
Comment Number: 8
Please refer to the response to comment 8, letter from the U.S.D.A.
Soil Coservation District, on page 11 of the Final EIS for a discussion
of the City of Renton Wetlands Report. The study has been accepted as
a technical document and is awaiting review by the Planning Commission.
It has not been adopted as policy by the City Council. .
As noted in the Draft EIS on pages 19 - 42, the proposal is consistent
with the City of Renton Comprehensive Plan Map. However, the proposed •
development is not in conformance with. policies regarding the natural
environment (i.e. wetlands, flora, fauna, and open space) : This EIS has
disclosed the relationship of the proposed rezone to applicable goals,
policies and objectives of the Renton Comprehensive Plan, as well as other
applicable laws, policies and plans.
•
•
-69-
•
LETTERS NOT REQUIRING RESPONSES
- I
1'llf
it)1 IN SPLI[MAN :! ', JACOB TFIOn1AS
Governor '�"\
� ,.�.:: Director
STATE OF WASHINGTON
OFFICE OF ARCHAEOLOGY AND HISTORIC PRESERVATION
ill West Twenty-First Avenue,KL-11 o Olympia, Washington 98504 ® (206)753-4011
•
May 27, 1981
•
Mr. David Clemens
Acting Planning Director •
City of Renton Planning Dept.
Municipal Building
200 Mill Avenue South •
Renton, WA 98055
Log' Reference: 155-C-KI-06
Re: Black River Industrial Park DEIS
Dear Mr. Clemens: •
•
A staff review has been completed of your draft environmental impact state-
ment. The document exhihits a well considered concern for the cultural
environment. We note your commitm.;r.t to identify, preserve, and protect
cultural resources which are known or anticipated to be present in the
project area.
Please accept our sincere appreciation for your commendable efforts to
protect our cultural heritage.
•
Sincerely, •
•
Sheia A. at mp •
-
Archaeologist
•
db '
•
t .. ' J
•
-70- 3� '
Seattle-King County/®EPARTIVIENT OF PUBLIC HEALTH
= J � L
, � 400 Yesler Way Seattle, Washington 98104 (206) 625-2161
JESSE W.TAPP, M.D., M.P.H.
Director of Public Health
May 4, 1981
The City of Renton
Municipal Building ,
200 Mill Avenue South
Renton, Washington 98055
Attn: David R. Clemens
Dear Mr. Clemens:
Re: Draft Environmental Impact Statement
Black River Office Park Rezone
This department has reviewed the above draft environmental impact
statement and does not foresee any significant adverse effect on the
environment as a result of the project.
Very truly yours, •
y ?'"Srlieiz-e-:--•
hn P. Nordin
Chief, Environmental Health Services
•
®I:mla
l•CI 1, lnSl
•
DISTRICT SERVICE CENTERS:
CENTRAL NORTH EAST SOUTHEAST SOUTHWEST
Public Safety Building 10501 Meridian Ave.N. 2424-156th Ave.N.E. 3001 N.E.4th St. 10821 8th Ave.S.W.
Saattle 98104 Seattle 98133 Bellevue 98007 Renton 98055 Seattle 98146
625-2571 363-4765 885-1278 228-2620 244-6400
• —71—
•
/Y
•� �-Li., : Tq-,�i 1, ?LA
it .•, ��..,., ,'t 1z-5..... . .i'�, S`;r•!', Stt9id _Ji.>fcY. U c
William J.Justen, RE., Director
Charles foyer, Mayor May 14, 1981
I .
Mr. Dave Clemens
Acting Planning Director
City of Renton Planning Department
Renton, Washington 98055
Dear Mr. Clemens:
We appreciate the opportunity to review the Black River .Office Park
DEIS. The City has no comments on this proposal.
Very truly yours,
WILLIAM J. JUSTEN, P.E., Director •C�/►U attia-A-b4
By: DIANE L. ALTHAUS
Environmental Specialist
•
DLA:mr •
,I
•ry 111
•
An equal employment opportunity-affirmative action employer.
Scats e Dcparlment of Construct;on and Land We.503 Mun,ctpal tluttdmg,Seattle.Washington 98104
—7)_
APPENDICES
A. Black River Office Park Water Quality Impact Assessment
B. Black River Office Park Expanded Traffic Analysis
C. Correspondence from the Renton Public Works Director
D. Black River Office Park Drainage Analysis Supplement
APPENDIX A
F' 'Y
November 4, 1981
• E T ANCO Engineers
• - ENVIRONMENTAL AND TRANSPORTP.T;ON CONSULTANTS
1515-116th AVE.N.E..SUITE 200.BELLE.VUE,WASHINGTCN 98004
(206)454-0383
Pair. Del Bond
Aiterra Corporation
2120 A S.W. 152nd Street
Seattle, Washington 98166•.
Re: Black River Office Park •
Project No. 82024-30
Dear Mr. Bond: •
Enclosed is our analysis of water quality impacts of proposed combined
stormwater discharges to the old Black River channel in accordance with our
letter agreement of September 22, 1981.
During the course of this analysis we have uncovered additional concerns
regarding flood control and wetland filling. We will be providing you with a
brief analysis of these issues in a separate letter.
We are very pleased to be able to provide this service for you. If you have
any questions regarding this submittal , please call .
Sincerely, . •
•
EUTRANCO ENGINEERS
ea-f-g• "" • .
•
Patrick H. McCullough, P.E. •
Vice-President
•
PM:l be
Encl .
•
cc: Bob Thorpe •
-
•
•
Alex J.Redford,P E. • John T.Bannon.P.E Patrick H.McCullough,RE
EFFECTS ON COMBINED WETLAND TREATMENT OF
STORM RUNOFF DISCHARGE FROM BLACK RIVER OFFICE PARK,
EARLI 'GTON PARK, AND EARLINGTON WOODS
INTRODUCTION
The information provided in this report is in response to comments received
on the Draft Environmental Impact Statement for Black River Office Park. The
lead agency, the City of Renton, requested the project sponsor, Alterra
Corporation, provide additional information on the water quality impacts
attributable to the project. Specifically, the Environmental Review
Committee requested additional study regarding the ". . .ability of the Black
River channel to handle runoff from this project in light of Earlington Park
and other developments in the vicinity while maintaining a 'wetland
treatment' . "
DESCRIPTION OF ANALYSIS
In the Earlington Park Water Quality Impact Assessment (Entranco, 1981) , it
was determined that the old Black River channel could provide sufficient
wetland treatment for stormwater runoff from Earlington Park and Earlington
Industrial Park for a one-year storm. To determine the impact of runoff from
the Black River Office Park development, runoff from the total area
discharging into the Black River channel was calculated to determine the
effect of combined discharge on wetland treatment. The total drainage area
includes Earlington Park, Black River Office Park, Earlington Woods PUD, and
a portion of the hillside north of the Black River Office Park. The total
drainage area for specific land uses was calculated and runoff coefficients
were determined. The peak runoff rate was then calculated using the rational
method. The total peak runoff for a one-year storm for proposed (post-
development) land use conditions was determined to be 110 cfs.
1
•
SUMMARY OF EARLIPIGTOPI PARK WATER QUALITY IMPACT ASSESSMENT
The existing water quality in the Black River watershed and the impacts of
stormwater runoff and mitigative measures have been thoroughly analyzed and
discussed in the Earlington Park Water Quality Impact Assessment by Entranco
Engineers. (A copy of the assessment is included by reference. ) The
following conclusions can be drawn from the Entranco report:
1 . Existing water quality in Springbrook Creek is relatively poor and only
slightly better than typical stormwater runoff quality. Springbrook
Creek exceeds water quality standards for dissolved oxygen, total •
coliforms, nitrate, ammonia, and phosphorus.
2. Existing poor water quality in Springbrook Creek is attributable to
stormwater discharge from existing commercial , industrial , and
residential land uses upstream in the watershed.
3 . The existing old Black River channel is providing wetland treatment
(physical , chemical , and biological removal of pollutants) for stormwater
discharging from the existing 60-inch storm sewer outfall . The
concentration of most pollutants is lower in wetland-treated runoff than
in Springbrook Creek.
4. The quality of wetlands in the old Black River channel has been degraded
. by the present discharge of storm runoff. Most notable are accumulations
of floating oil and grease and other debris.
5. Under existing conditions, the old Black River channel possesses little,
if any, value as fish rearing or spawning habitat. Downstream and
adjacent upstream segments of Springbrook Creek similarly provide little
or no value as spawning and/or rearing habitat for anadromous fish
species and are therefore of value only for anadromous fish passage.
Other system characteristics, particularly the P-1 pump station, are
likely to be more limiting to fish passage than water quality.
•
6. Previous work by Entr:.nco Engineers and others has demonstrated that
significant fractions (60 to 95 percent) of stormwater pollutants are
contained in suspended and settleable forms that are potentially , -
treatable by sedimentation.
7 . Use of the old Black River channel wetlands would provide sedimentation
treatment as well as chemical and biological removal of stormwater
pollutants from existing and post-development runoff (Earlington Park and
Earlington Industrial Park) from stormflows equal to or less than the
estimated annual discharge rate of 45 (cubic feet per second) cfs. APWA
criteria for sedimentation basin design indicate that 2,030 square feet
of sedimentation area are required for each cfs of stormwater discharge
to remove particles (and associated pollutants) of 10 microns and larger.
The old Black River channel occupies 97,500 square feet of surface area
and actually exceeds the surface area (91,350 square feet) necessary to
provide the proposed level of treatment.
8. Gabions should be installed in the old Black River channel to: (a)
provide dead storage; (b) increase surface area of wetland contact;
(c) reduce hydraulic scouring during storm events; ( d) provide for
primary sedimentation separation; and (e) provide for accidental spill
control .
9. The provision of wetland treatment as proposed, in conjunction with oil
and grease separators and periodic street sweeping, should result in
sufficient water quality treatment such that no significant impacts to
Springbrook Creek will occur. The basis for this conclusion is derived
from the fact that: (a) Springbrook Creek water quality is already very
poor; (b) the post-development discharge from the project site will
represent less than 6 percent of flow in- Springbrook Creek; and
(c) wetland treatment is expected to provide water quality superior to
water quality in Springbrook Creek.
3
•
The following assumptions and limitations should be considered in reviewing
this water quality impact analysis:
1 . According to DOE water quality regulations, existing water quality
represents the water quality standard in those circumstances where
existing water quality exceeds the designated water quality standard.
2. DOE water quality regulations contain a provision for nondegradation of
existing water quality.
3. It is assumed that design criteria for water quality treatment facilities
can he limited to consideration' of the annual discharge rate and that it
is reasonable not to provide the same high level of treatment for larger
storms of lesser frequency (5-, 10-, 25-, 50-, and 100-year •design
storms) . In this respect, water quality design criteria are intended to
provide treatment for the majority of storm volume and not for maximum
discharge rate. •
4. It is possible that pollutants that accumulate during periods of low flow
(annual discharge rate and lower flows) may be flushed from the system
during periods of high flow (storm flows exceeding annual discharge
rate) . Provisions of gabions and dead storage, and the presence of
wetland vegetation, should substantially reduce the probability of such
flushing.
5. It is essential that all runoff be discharged to the upstream end of the
old .131 ack River channel .
• •
•
INFLUENCE ON WETLAND TREATMENT OF ADDITIONAL RUNOFF FROM BLACK RIVER OFFICE
PARK AND EARLINGTON WOODS PUD
As indicated above, the combined post-development runoff from the Black River
Office Park, Earlington Woods PUD, Earlington Park, and Earlington Industrial
Park has been estimated at 110 cfs for a one-year storm.
The old Black River channel provides approximately 90,000 square feet of
wetland treatment area. As shown in Figure 1, this wetland area will remove
all particles approximately 16 microns in diameter or greater for the design
discharge rate of 110 cfs, Treatment for smaller streamflows will be greater
and will remove particles smaller than 16 microns. •
Entranco Engineers (1980) has reported that significant quantities of most
stormwater pollutants are contained in the suspended and settleable solids
fractions. These data provide the rationale for physical stormwater
treatment and indicate that as much as 60 to 95 percent of stormwater •
pollutants can be treated by physical removal of suspended and settleable
solids. In a study of street surface runoff (Sarter, 1975) , it was found
. that, with the exception of phosphorus and nitrogen, 70 percent of the
pollutants measured (total solids, volatile solids, biochemical oxygen
demand, chemical oxygen demand, Kjeldahl nitrogen,' nitrates, phosphates,
total heavy metals, and total pesticides) were contained in particles 43
microns in diameter and larger (44 percent for phosphates) . Therefore, the
treatment available in the old Black River channel is 'sufficient to remove
more than 70 percent of most pollutants.
•
Ongoing research being carried out by the University of Washington includes
observations supporting the wetland treatment concept (1981) . Although the
final report has not been published, preliminary results suggest that a
grass-lined channel 60 meters (197 feet) long will remove 80 to 100 percent
of the initial lead concentration; the results for zinc, total suspended
solids, and chemical oxygen demand demonstrate similar tendencies.
• •
. .
•
•
. .
•. -
• . -
io4x .• , ... . _ . .. . .
.
. • . .. ... •
, .
-- , r •,••
... .. - e
. . . . . .
. . . :. ...
.. .
• • . . . .•-•;-• ••• •:-.• ••• .•'.-.:•-.. -•-••'----...---:':--.•:-•:• • - . •- ::,•.• - ,
•
. . . . .. ..
•
.' .
. •. . . .. .. ... . .
- • • 7: -•:, - . • % . ' . .
•
, . . , .... ..... . .. _ • . . •. .. . .• ... t . .• .
.. . ..
. ... . . •
- .
. .
- .
- - ... -..:.1.•'•-•: ' '-;".•'•.'-' -::••:: -:----.-.-;--; .-:.--:.-1. i
- •
- .....:-.--......-:•':-.7-: •:-r. ..• i-..:.i.-:-.- -;.'•••..... .:::-.•-•:. t . . •
12.....-:;:..::'.. i...........-i:......:T....i ::::;:-.•::1..:.r.... ..• i - . - •
. - -
•
. ;••-'.:.-;-: ,•: ••• 1.,i'.H-...---', ...Ft--!-..7--; : !• :i' •/ . "i• "- ••'•'• -•-1'_:.'.;St-:-...,.:_•'.:f 7:'...-.::::•..i.;_:.11.....•'•1 . 1:....i.. 1 . .
1--- -:-. ---.-.1.:-..-..,---!-:...-"T---.-",•.--".:,, -,. ..".'..--:;-.:......:-.:-:::-.:_.....1..... ,,.....;.•:_ •:•:i-• -:.----,••• -i::::::-.... • ••.'.•1 . .
- '-•-•••‘-.1.7 . ' i ' i— l'• • ' ' • ' / ' 1' ' ' ' • ' .1..:, '.„...: :!.•'....!...i...''.' '.:•_', . .. ,..••i!.-......!.: ...--:-. .. .---,-..,- -,, ••!,•,--;---•!-., •- ! r ' '•' •f ' , , ,,•, ; ,• i ,••• :• :::. , ; •
• .
• I . . ; • 'I. •.1 ••••1.. • 1 .•• • ' . ; • ,I I ,• • + T•'•• •'-: _..1;;.: •• ..; ' ..
•:.. .1 • i ' ! L • :L. '1,-• ;:••••.; ' ; : ., i . ._.;..-I: . ...I.__ ........; • :1.• •.1' ......... :.........,...; •: : , : •-• ,,
10-'X •• • - '7.-..7 .• '—:'::•i:....-.7.••--:._:::;.77.. 1 :::. ,...'...,......:-. .....:.. • .:-...•• -::-: .: - -.... -••::-.....1. .:..-• -.;.. ...-, •. .
• •
CI is:•--:•.-----:_ ;•:,••=7:.•••:'--• L•-••:::-',-.7'..--:-:..•,-:: .:'•---L--'.-•:•:.i•:::.'';...........: -- ..,..:,..:..: . ...-::-:,_.:.i•..:-::...::_...;'•."_..;...• •..., .
Z .
0 ._........ ..:1_,...i-.::.-_ I - . .,_ -..,r•.1,...-•:-.::.- -.•i••.:,-::-.•7 . ..... ,,.;_ .;..,...... . ......:.,...........,. ,..,.., ,..r.....,„:,.......-..i
(-) -•;77:•7.-.7-..-;-"-*:--L .:•-•;.-;.• !77-•- ._,',,..:::•.: , .•: .: r•-;.::: • .'.- .11„:::-.;:, ,•.:-. . ..:,-;.:f;',...•.!..: :........,. .;.-.• • :::. i •
Lil
. 69 F'1".-.-..7.-.---..Z•-•'.--,•-..-7.77:::::".',:.f_7-:.:-:,-,7,- --.;7-1.--.7:. : ',-:..•• --.7..-.. ... ':-•,.- .,,;,:: ',...•.:... ..,..•..E._.,:...:::;..:••..:...;.; : ,:.:•,,.. t
•
. ......
al
a.
• .
•,-...--:-.--";:;---,---•.;'•,-. • -:-..-i, . ::--.; .-! ...c...-..-....-:.:-:."i-:..±... .:•: --.. .:•. ••4;,:.-.!. .• •...:,...:;':..;,..:-...;:...;••.-.;.-.....-.7:-..,•., -
I--
LLIr•-•-•-•••-':-.;--•- '-..--• ,•:-L--,..:.•:,7:! •.,:',-.".'".:,' :-.1.:::, .!:,L.:','".• .: '!'' ':.::)...•.'.:7,.-":....7. .,,,.-.;;1.7..::.::.•....:.!:. .....'.1.- , . •
•
• Ill
Li. . • - - • • •
f i-..,-,-:..•;-* ,-1.“,-,,-.:1----,-1 -i:'•-;••",. ..1",1 .7: •.., • ; . _ :..,..I..,.,...,._:..;;,..:.'........,.:::__. 1,....,! .....•.--•;; ., . . ... -
- ,
0
_ .„;.;---.2...;-;----j,...-- :. .,:••1•-•:•[..;••••-• s-•-;-•• r•-•;!-:•. ; •:•.:. .-; ,-.•-1-.L-7 !••;:; . ::',..:..I, • .
. CO 1----- :,-- ,1--,•••:,-.•• , -1-.7-1-'71-:,.1-1- '-'' - ", "•'"-;--•"! 2";.....l..-s.:1:1":":.:;....`,.1.:":;••• ::...-:i'Ll_; :..;,1 .:;.:... I .
1-'-'-','''-F.'- :"'•-•--TH.-:;:,1-i".:.1—.1.7. '... ......,....i.:...'.j:'-.- ...1-1"............i....'.-;'.'•.'' ',- 1 :.,.. .!'''.• • '•:''' •--1 .....`.'• ,
. .
. . •
. 1,._:_.:_•••_i__!••••-••••• •-,........-1---.---..-:„.•.--.--,i-:-:•1--::1.7.7,1••-:-.,i:•-;-.1-•:....:-.,..-.,••:•::-:.i..-.,---,- ---:,-....-:-..--.--,•.-.:.-.....-:-.:;;••••••,•-••••:;;:;-;-7.,-.•:-_,----..-;:-_-1-_---.:••••.--,-,;,.-•; • .
, 0 .
••"••••-•.• !-:--ct-- --c.•:;;:.:.;:'Th--771- •.. .; : ;: .. 1 :-; ••1•;•:, : • : : :..:.;;;;•1 t..;;I.'.L.:;;;;i...:,;,...:ii ,...,,:;:.1,._„1,....1.•, • ''
• , : -•-:- -;•-•• •--f-;"-.-;,-- •-:,-,-F.- :. r'-'!'-••:;' -1,-";..:-',.'''"'------• '-; ;-".---.-11,-••F;;;1;•••1:1;•,17,1•;:---•;;:ill:, .-::;,1.;•; . , - .-.
. . •. 1 10 CFS • , , • .,...-. 1.! -;•:!-:..1.!• - ..,:-.........1....L ,..1. :.....4.. .,;.i.:,„..-......::,!;,..., __!,.,.: .-:. ..:;i;i.i.l.....1,........,,..,• -, ;. .
•- . .. .• . . , ./..' :LI:.'• hi•;1_;L;i:'..:1._:1...11.!_-.; -••1).',_1 -..:.'.;•.:i_.'_...,...‘.. _!..-..1_.',1;.......1..T.!.-' •1:1.•;....F-- 1.'._::i- !...L..-.i 4 ..... - ;
• -
1 0 2 X -;-:.7---7;7 7.' - -.--.-F-'-f.::."2--.T"-_-:':-...--:::::.:::.."'::.-ill"1.•:''..:_f•-;:172." -:-.;;.-.........;..-,.....,-7- :,...- T.....:.-ILPT'.....,:•'':*!',,..1.'',.:.'1,-,:.7.':....-.,' ..7,...:.:,,•';•..,-:',....:,....•; . ,. , ,.
,. .... • c,!'''''';'•''•'-''';• ' '---'; •••••-•-•:''''.1-:"7.1.::::':r•:-:::.;"-,7-:-:•.-.77,-7.:'',...-.,'..-i•i'1'..--.•;•-'.,•-i.: -...f-.:77.7.,:-•.--7_-,•-,'-:•• ':',1 i•1 :::.F.-•.11- •-.:••••::'•• -•-.-..;.:.. ., -• ' , - '- :....
. .• „
.. . .. .. • ' . • ' ''[.::...;..f.7:. . ..•I.: .:.:::-F...":1:“-i:r.-'..E1.14r-i..-1-.1-.E.::::•-•.:::;'7F...1..::.•,:::'.•1•:::..7.;.1•::,7:..."•:;.;i1. ...._i:.::::r;r:..1.7....:.-...-:::...L.;:._-_...: ........:F........_,..1:;•?.t:-,,1-::::,.`----z•;•:I,-......',1•::-:.•-:-;-:•,.!;-.1 . :,,-.,.•,. .,,,, ,
.._...
. . ... .. ;-.• :....Jr •..-:!:1-:.::;:1;;:i1,--.•,-;,••::.:;•_::1::-..•:.1::.I-.•::,:...-1-::2:::;.•:•-•-•:-_1. .;-.-.•:...:.•:-.-_-.1.-;:•...--,-.1::;•;-....;.:;,..;.••.....-.-:,;:::•;::•-•_:.;_;;.,..i.•;::.;.....:;;.:i ; ,....:„ ,. ....• ; .,...•
., . ',;: ' '. • ' . -••• I•7-•;• •-.•;:..!:. ..-..::.4::::,...V.•.;:-1'.;.-‘;:j•::.-.1i..:::.;,r.;.;••••..:::-_-:;-;;;:::t•::•1::,:•.-....--,._-- -1_-;':.-:::;1-;.;.5.•;',:;.•:•1-:„*.!;•••:••1:-.-,-,.1:::::h'i ..•,.: ...f., , •,,,,,;;...,'.' -
• , . ' '';'i— -7--,-•r- '''''':;','-:-:::::,',71';"7.'"!':';'...,''.''''••'7.r7:-.1", -717L-7,.' s:--?-is"7:-.;-.:F.:7,-.7f.'I'1-.7-7 i:";:r;;''',7j;')-Lil.'::7:".1:•,.."77-p,-1...i-.-•-:-...:-:-,,:-.•! ,
•I f:t''.:•.-1:-.1'.•.-:;r:-:7_:,..-.-;:•-•-:::;-1•:.•,•,•.;•.;•.•;',.:-,,LI,•,•,•:-,-.1:.;:1-,.-:.-.:.,•;=:,:.::.,..•-,,,'i ,.•_ ,• '.'
. ; •3•-_--.1.••••:-..:.1.••-r,....-_:±.-...r;.:1 :.r•.'2r;:t•.'.-.,:..:'1_:...'....:•:.1.::_:-.--.:_l_•-t•-•-.I ---'..:':-.!::.:,.......:,..,....-...-:.!.....,.1::-.. .'.- .- .--- . . . -
• , '. - '-'',..,--.'" 7:-...T,.:.,.!:...;•4-i...:.:.;'.1-i-,...F-; E:,..:.,:• :•-: .1..:.-7:i.....:.f.•.I.; i -.•.--,..".-..,--•.7•,..,..:71.....:-:.'..i.•...:j.":',!•,.1.;i-•:,..7.•,..,i't.':,..,-.,_.,:.:r, t,...,..1......!...;.,1 ,' : ,-,,. :, , • :-,
, .• . i .:-..E.ri...::::;. •. :.1.:.,:-....;•:::t-..1::•'.:.'.:'.'.!..;;''.'"1.. ::'."' i'. '."'.• ::-„......:...;.:_il,•,...•:7;.. :.., ...:.1r-.:..........:::..,,...:...„.......!";......,..:,,,, . . -
' . ''. ',1:7•.-7•77-7:";'''''.. --::-E'17t:•7;' 11-,.:':..F ;:::4 T."...7::-.:._-; :__•...-i_::::::.*1-•-:',.:*;.-::ii;-:.;'.;:'....i.F.::-:•1,-::1 -.1.,..::-.4
1..'"::';-•''''''-'s -••••••••'-;;•-.:'-'-:---:•1 :;----I' ';',:.-.-- L.;•:::. ;•:-_'-:::•:1.- ::-.:3::_:_;i:-.,-...::::i..!::y••••ti';'.-,:-..-_•:',::,:;:.::: - z:-., .,.• ..-:','... .•
i:-:-.----L:.;••••••.:T! :-7-trr-i•::::::,.!:..:...-..iiP_:,..;.E.,ir.......ill:.7..,.• ;''...',...41:_li''_•• '-'..."J.I.,..1.:..:•.-,'I',.. •'....-'!.. ;,......--.11.4::-`•••• •!.... ,‘,....!..:..1 • . '
. .
. . .. .
F-;f'...;iii;:•."71:;-...1.:..j..-1 .•, i.:.:L.:!..;. ,,..•,. ...:.. , 1. . ....t.I..•.,i... r. .: ::,,, .. ,;.! . .: ,••. ; :,e .. •
S...L:4.::_.2.;...;..1..;.::,..;i;i.,:;',.„.',2,....L.!..:.:-..:.:1.,......:..;.:r.:4.....',;L'.1...."-1 ...:.:.,'.'• • -
Fr;-'.-1.'•• '';''';7 7:;'''1;"'';;;;I.;.'i i...::-.1:::''''';',...•'•;'..',...I;•r.,:-....:"..;.11 ..'..,....": 'i-.:;-.7 .....11.':::i 1 s:;.;-'./.i'II'H I: ;,:i.......1.'':..; ''.: ',;.::•. • ,
I.,..:..1..:.:.. . . ....!-,_::'7 i'.;•.:11-;,,L:.-:.,.-.Li r....r.:'''.;•.:'..:'!:I;•.:1.:F.";--;I...,:i.- •:• . , I •---I,-,•-•i•,,,T 'I• •;I':,!-:-•-...;....''.•,:,'- • ! ;
. • -• .--,- -. -'--:-I--'..---1:•:::7- ''•': - 7 —-7--7-.-- '-..:-.-7-:.T. _, ...:,...• •.:.i . •:,.:;;.. : •:
.. .. .
. :—•-7-7•--;•;•; - . • 1.•;-;;;;h:P.C:,i11:-,r.;•1..;._:•;.r.- ;::;:',•:-.:1..;F:_•....1•..1 1 : :.:.;.1.1.; .. .:L:i.....pi..,i... 1: „. .11;:•1:.".•....; • •-•• . •
....1.,. .ii.....;;.1. :::i.:,,i..„,.•.,,........! .i.11;....:•..1:,:; ;,_: :.;.. ; ..: ._:..!..:.,.;; •..,.1. •,;• •,: 1::::. . 1,,.,i ;:•,•!..1 -.. .i..:........„, ••.•!; ,••:-•:1, •••101.•-•:••;•••.•;-.1,,;!•••-.•:•.•••-I •••.•,•,:il-•:-•-; 7 • - ';--•-i .::• :!.:1," ••;;;,--1 -i•--.:::;;;;r:r •; •:';:, I • , .. .
., .•
1.._;....-1 ;••••1 •):;•:1;:....:,.....1.1:,...;••..• •....1.:;•_.,.....: .• ,._ ....,...1 .:.d •,,I. .!::...!.....i..... _........,:,........: , •-:,-•••—1 •• 1.,; i ;.••:.• . I. ••—• :,•••• • .• . • • II ••,i: i•—•• ! -,,..•1•• •••••I : ••• : .
. . •
• ..
• • . I_....i.;,..• ;I;!';.j.;;:ii;:,,, :;.; ',..•,..1; :.1:..:;• :.:4.:..',:•4 : .1 ; . ....:.! ....;.!;;.:1•—•'• :•.:!.• 1,::1 • .! -; I• .!,•••!;.• • . ; -
. .
• ; • ; ; I
•. .. • • • ..1..L ' —t--I- 1. . [..'.1:-;;- , 1. . J.''. . . '' .....:•,;J.L.. . 1J11
1__ .,, 1i_... J
IX10 : . L CC1) 102 .'..'t'X103 .
... . .. ... •..• • •. .. . . ,
. . . . . .
• • .
. . .. .. •.• . ' . .. .
•
. •
PARTICLE DIAMETER . • • . •
• . .
• . . - . • . .•.• ..
- . . . MICONSR .,. . . . .. .• .. . • •. -
•. .. • .. . • , ..- . .
. .
. - . .
. .
. •. . . • . . • • .
• . - • • •
. . . . •
. . . . . . .
. . .
. . .. .
. .
. .. . • •
. . • . .
.
.... .-
FIGURE 1 . .
. ' ' • - .
• : • .
. .. . -
• .
- , SED1MEi\1T REMOVAL PER TOTAL CFS . , _
.
.
. . . . •
•
.. .. ... , ,, ,.., . . ..... -. ,.
,. .
. .. .,....
. . . . ' FOR 907000 S.F. AREA .
._ . . . ....
. . . , . ..
. .
. . . ..
. . . . • . . . .• : .
• . .•
. . • . ....,. .. .. .. , .
. ..
•
. . . . .:...•.. . ... . . . .. . ... ..
. ' • . APWA (1974) CRITERIA.
.. . ,. .
,.. .
• . -. . .. .
•• • ..
.. : ... . . ..
, .. . . . . ,. . . . . . •
. . . . . • .
. .. ... . . - .
.. . . .. .
. • . . . .„ ,
- . . . . .
. - . . , • ,- ..
. .
- _ ., . . . .. .
All of these studies support the adequacy of the old Black River channel to
provide a high degree of water quality. treatment for the combined stormwater
runoff from existing and proposed projects in the vicinity.
EFFECT OF THE P-1 DETENTION BASIN
The preliminary design of the Earlington Park storage pond (January 21, 1981)
by the Soil Conservation Service shows the old Black River channel included
in the total area of the storage pond. If this. design is used for
construction, much of the old Black River channel would be eliminated and
would no longer be available for wetland treatment. Although the storage
pond itself would provide sedimentation treatment, this treatment would not
occur prior to discharge into Springbrook Creek. However, as shown in the
water quality assessment for Earlington Park (Entranco, 1980) ,. the existing
quality of Springbrook Creek is only slightly better than anticipated runoff
quality, and it is doubtful that post-development runoff will result in any
measurable increases in the pollutant concentrations in Springbrook Creek.
CONCLUSION •
The old Black River channel is of sufficient area and length to be able to
provide adequate wetland treatment for the stormwater runoff from the Black •
River Office Park and the other developments in the vicinity. This
conclusion assumes the installation of. gabion structures and implementation •
of supporting mitigative measures as proposed in the Earlington Park Water
Quality Impact Assessment (Entranco Engineers, 1980) , and the Black River
Office Park Draft EIS (R.W. Thorpe & Associates, 1981) . Discharge of all
runoff to the upper terminus of the old Black River channel would also be
required.
•
•
•
LIST OF REFERENCES .
American Public Works Association, 1974. Practices in Detention of Urban
Stormwater Runoff. Special .Report No. 43.
Entranco Engineers, Inc. , 1980. Restoration Analysis of Wapato Lake, Tacoma,
Washington. An Evaluation of Dilution and Stormwater Control as Urban
Restoration Techniques.
Entranco Engineers, Inc. , 1980. Earlington Park Water Quality Impact
Assessment. Prepared for First City Equities.
Environmental Protection Agency, 1972. Water Pollution Aspects of Street •
Surface Contaminants.
Thorpe, R.W. and Associates, 1981. Draft Environmental Impact Statement for
Black River Office Park. Prepared for the City of Renton, Washington.
Thorpe, R.W. and Associates, 1980. Draft Environmental Impact Statement for
Earlington Park. Prepared for the City of Renton, .Washington.
University of Washington, 1981. Highway Runoff Water Quality Report #13.
Prepared for the Washington State Department of Transportation Highway Runoff
• Water Quality Research Project.
•
•
•
•
•
•
•
APPENDIX B
The
Transportation Engineering & Planning Consultants • `
111
November 20, 1981 Crr'Qi\Jr
Ms. Deborah Krouse
R. W. Thorpe and Associates
815 Seattle Tower
Third & University
Seattle, WA 98101
SUBJECT: BLACK RIVER REZONE
Dear Ms. Krouse:
Thank you for asking The TRANSPO Group to expand on our preliminary
assessment of traffic conditions associated with the proposed Black
River Rezone. This letter presents an estimate of the daily and eve-
ning peak hour trip generation, a general estimate of travel distribution
and traffic assignment, a summary of anticipated traffic problems or
concerns , and a list of reasonable mitigating measures. This letter also
responds to comments on the Draft Environmental Impact Statement (DEIS) .
We have duplicated much of the information contained in our March 29, 1981
preliminary assessment to avoid cross-referencing of information and to
help readers unfamiliar with the background leading to the final environ-
mental impact statement a more complete understanding of the traffic issues.
We might also mention that in preparing this analysis, we met with Mr. Gary
Norris, Traffic Engineer, and Mr. Dick Houghton, Acting Director of Public
Works to discuss the specific level of detail that would be required in
this analysis. We all concluded that the description of the development
proposal as expressed in the rezone application was too general for detailed
traffic operations analysis to be meaningful . Thus, we agreed that this
general analysis was more appropriate and at such time as a specific project
proposal is defined, a more detailed traffic analysis would need to be
prepared by the project sponsor. Subsequent to this meeting I spoke with
Mr. David Clements, Acting Planning Director. He indicated that he needed
some traffic assignment information in order to estimate air quality impacts.
Project Description
This analysis is based on the site plan and project description which was
provided by your office. From this information, we understand the project
will include about 35.58 acres of office development and about 12.09 acres
of warehousing. The warehousing is proposed to be served by rail The
offices could be one or two stories in height, depending on the market for
office space at the time the buildings are being designed. We understand
the project is proposed to be constructed in two phases with access to
Phase I provided by a single road that connects to the road system that
serves the proposed Earlington Park development. The second phase, on the
T«enh•three 1-18th :\venue Southeast • Bellevue, Washington 98007• (206) 641-3881
Ms. Deborah Krouse e
November 20, 1981 ,
Page 2 � �
Grow
western portion of the site, will connect with the Phase I road system
and plans a secondary access to Monster Road across the P-1 drainage
channel .
Trip Generation
Trip generation estimates (number of cars in and out of the development)
were made using a range of assumptions regarding possible building designs
and functions (e.g, one-story or two-story office buildings; office park;
or general office development, etc. ) The Institute of Transportation
Engineers Trip Generation Manual , 1979 and Arizona DOT Trip Generation
Intensity Factors, 1980 were the sources of trip generation rate information
(trips per 1000 square feet) . Applying these trip generation rates to
the proposed development, it was found that this development could generate
between 9,070 and 34,030 vehicles per day (vpd) . The evening peak hour for
the warehousing portion of the project generally falls slightly before the
traditional 4:30 to 5:30 PM evening peak hour. Nonetheless, because the
office development will comprise the majority of this proposal , a 4:30 to
5:30 PM time period was used as part of. this analysis. Combined office and
warehouse uses are forecasted to generate between 1,250 and 3,970 vehicles
per hour (vph) .
Trip Distribution and Assignment
The travel distribution for a development like the Black River Office Park
is largely based on the distribution of populati;n since a majority of the
trips to and from an employment center start or end at the employee's home.
This distribution needs to be tempered by other travel patterns like those
associated with general business activity (e.g. , sales) and service and
delivery activities. During Phase I , all traffic will enter and exit via
the Earlington Park development. The majority of this traffic is expected
to travel along 7th Avenue to Rainier Avenue and Lind Avenue SW (about 70
percent) , while the remainder will use Powell Avenue to gain access to
Grady Way. As the access road along the alignment of Valley Parkway is
built, this route will also be used by traffic just for the valley area to
the south. Because construction of this road is dependent on the action of
another developer, no traffic was assigned to this route.
Figure 1 shows the travel assignment that is expected to occur after full
development, assuming that connection with Monster Road is provided. It
can be seen that a large proportion of the traffic (about 25 percent) will
be using Monster Road to Sunset Boulevard where it will split with approxi-
mately 15 percent traveling north to nearby residential areas and to connect
with I-5. The remainder will follow Sunset Boulevard east to Rainier Avenue
where traffic will split with some continuing on east and the remainder
turning north on Rainier Avenue. The majority of traffic destined to the
south will continue to use 7th Street, Rainier Avenue, Powell Avenue and
Lind Avenue, and Grady Way as primary access routes. This assignment
llll�
Ms. Deborah Krouse
November 20, 1981
Page 3 @row
•
reflects both daily, and PM peak travel patterns. During the midday, I-405
and other major arteries are less congested than during the PM peak hour •
so the traffic distributions for each are slightly different. Thus, during
the peak hour, travel on minor roads and on routes that may appear to be
out of direction is to avoid the congestion on more major, direct routes.
Like the trip generation, the travel assignment shown depicts ranges of
travel volumes that could potentially use the roadway system. The project
generated traffic volumes are added to estimated 1984 traffic volumes
(volumes without Black River Office Park) . This shows that Sunset Boulevard
east of Monster Road could carry between 2,800 and 6,600 vpd and between
400 and 950 vph during the PM peak hour. Rainier Avenue S south of Grady
Way could potentially serve between 66,780 and 76,750 vpd and 6,610 to
7,400 vph during the evening rush hour. Grady Way west of Powell Street is
forecasted to carry between 13,490 and 18,400 vpd and 6,160 to 7,400 vph
during the evening peak hour.
Impacts
As you know, a display of traffic volumes alone does not give a true impres-
sion of the impacts that would be created from traffic generated by a new
development. Rather, traffic volumes must be examined in the context of
many factors including the street and intersection design, traffic control ,
and characteristics of the traffic flow. Techniques have been developed to
incorporate these factors and are called level of service analysis. In
urban areas these levels of service are measured at intersections. Unfor-
tunately, the range of volumes that could be generated by this project is
too broad to give meaningful results.
Nonetheless , it is important for the City to have some feeling for the impacts
that might be created. To provide a point of reference, along Rainier Avenue
the street is now or will be (before this project is built) operating at
capacity (LOS E) . Likewise, some of the major intersections along Grady Way
are at or near capacity. Sunset Boulevard, except for the intersection at
Rainier Avenue operates above capacity (approximately LOS C) . There is some
potential relief to these capacity problems with the construction of Valley
Parkway. While this and other improvements like widening of Grady Way will
result in some relief to the local street system, the primary traffic arteries
like I-405 and Rainier Avenue will continue to operate at capacity.
Thus, even if the majority of the traffic generated by this proposal travels
on routes that operate below capacity much of the volume will ultimately
travel through one or more of the intersections or on a road that presently
operates at capacity. As a consequence, the congestion during peak hours
will become more severe resulting in more delay, assuming all drivers attempt
to make their trip during the peak hour. In the last several years , other
cities have experienced some of the same levels of congestion problems that
now exist in Renton. Drivers have responded by modifying their travel habits
to avoid this congestion by:
The
Ms. Deborah Krouse
November 20, 1981 ;. :
Page 4 Grovp
• Changing the time they travel to and from work. This does not
eliminate traffic but it spreads the peak hour over a longer period
resulting in capacity conditions that may extend longer than one
hour.
• Change from driving alone to carpooling.
• Change mode to use transit.
The intersection of Monster Road and Sunset Boulevard should be upgraded to
serve the increased volume and it is expected that the signal should be set
into full operation in contrast to the present flashing operation. While
Sunset Boulevard carries a relatively high volume of traffic, this inter-
section is expected to operate at about LOS C or LOS D in 1984 with this
project. Even though Sunset Boulevard is less congested than some other
arterials , it does not provide a direct connection to a majority of desti-
nations and it eventually intersects with more congested arterials. Thus,
any advantage that can be achieved through using Sunset Boulevard as a bypass
is offset by the out of direction travel and down stream congestion problems.
As a consequence, Sunset Boulevard is not forecasted to be used to the extent
that might appear appropriate at a first, cursory review.
Following occupancy of Phase II , the street that would experience the largest
proportional increase in traffic would be Monster Road. This road is pres-
ently a very narrow winding road and has a moderate grade south of Sunset
Boulevard, and has not been built to carry all of the volume that is likely
to be generated by this project. The increased volume in combination with
the substandard design of the road would probably contribute to an increase
in the accident rate.
In the evaluation of these impacts, it is very important to recognize that
any new development in the City of Renton is going to have some individual
or cumulative impact on the major streets in the vicinity of this project.
Thus, the only way to ensure congestion levels will remain the same as they
are today is to stop any and all new development or redevelopment that will
add traffic to the street system.
Mitigating Measures
As discussed before, congestion will get worse or extend over longer time
periods when this project is developed. Roads like Rainier Avenue and I-405
cannot be widened to increase their capacity so the impacts on these routes
will be difficult to mitigate by applying traditional road construction
solutions. Some road improvements that can be made include the upgrading
of Monster Road 'to improve both horizontal and vertical alignment to eliminate
line of sight restrictions, and enhance safety. Because of the proposed
e
Ms. Deborah Krouse 4k i :
November 20, 1981
Page 5 @row
construction of a road along the western edge of Earlington Park (along
the alignment of the proposed Valley Parkway) , it is suggested that im-
provements to Monster Road north of Earlington Park match with this road
and extend north to the Sunset Boulevard. In addition, the Monster Road
intersection with Sunset Boulevard should be examined at the time a more
specific development proposal is proposed and any project-related channeli-
zation or signalization improvements (e.g. , vehicle detection) that are
warranted be made.
There may be other traffic operations improvements that can be made at
some intersections in the project vicinity but as noted earlier, such
detailed improvements cannot be reliably forecast because of the wide range
of development potentials for this project. Such a detailed analysis may
be appropriate at the time a more specific proposal is developed.
While the potential for physical construction solutions to solve problems
is limited, there are a number of policy and program improvements that can
be effective in reducing or eliminating impacts. These include the following:
• Establish a new bus route or modify an existing bus route to
pass through the project.
• If bus service is modified to be convenient, provide subsidy of
bus passes as a company or office park benefit.
• Office park management should advise tenants and their employees
of the advantages of fleet ride, vanpool and carpool programs
through a package of information provided at initial occupancy
for each tenant and coordinated through the Seattle-King County
Commuter Pool agency. Office park management should also schedule
public information meetings for employers and employees.
• As much as practical , office park management should encourage
employers to initiate a flextime work schedule so peak period
traffic can be distributed more evenly over the 3:30 to 5:30 PM
peak period, and thus have less impact on the already congested
road system.
• As an inducement to achieve these objectives, the City may want
to consider limiting the number of required parking spaces to less
than is currently prescribed by code to discourage the use of
the single occupant vehicle. Another, less rigorous approach is
to reserve a portion of the parking spaces for carpools. Because
carpool incentives have not played a large role in the development
of new employment centers, it is suggested that about 5 percent of
the total number. of.parking spaces be reserved and that the Seattle-
The
Ms. Deborah Krouse b• .- , - "_
November 20, 1981
Page 6 wow
•
King County Commuter Pool monitor their use and increase the
percentage of reserved spaces when use reaches 80 percent •
occupancy.
Many persons believe these policies are not as effective as physical solutions. --
Yet in this region in cities like Seattle and Bellevue where traffic volumes
have reached capacity congestion levels , these types of policies have had
a substantial impact on maintaining or decreasing the rate of increase of
traffic growth. To illustrate the effectiveness of these policies, an in-
crease of the average vehicle occupancy from 1.1 persons per vehicle to 1.25
persons per vehicle represents an enhanced level of service from LOS E
(capacity) to LOS D. In a community like Renton where much of the employment
is concentrated along several major employers, policies to encourage ride-
sharing are increased.
Response to Comments
In addition to the above analysis we have been asked to respond to several
of the comments that the City of Renton received on the DEIS. The following
summarizes these responses.
Renton Planning Staff - (June 8, 1981)
In response to the desire for detailed traffic analysis, we met with the
Director of Public Works and the City of Renton Traffic Engineer and it was
determined that a detailed traffic analysis is not appropriate for this
proposed rezone EIS since the very general nature of the proposal results in a broad range of potential traffic volumes and impacts. The range is
too broad to make the detailed traffic analysis that is typically requested
by the City meaningful . Please see the attached memo dated August 7, 1981.
More important, the level of detailed traffic analysis typically requested
by the City is not appropriate for inclusion in an environmental impact
statement. We refer you to the State Environmental Policy Act and specifi-
cally reference the following:
WAC 197-10-440 (7) (i)
WAC 197-10-440 (7) (ii )
WAC 197-10-440 (7) (a) (iv)
Such detail is appropriate as part of detailed design studies. It is not
important for the City to know detailed improvements that need to be made.
Rather, it is essential that they know where improvements are needed and
the general ability for the improvement to mitigate the impact. Because
the City must give final design approval on any plans for improvements to
the public road system, specifics regarding the design aspects of these
improvements can be determined during the preliminary design phase of the
preparation of plans, specifications and cost estimates. -
e
Ms. Deborah Krouse LC. A".
November 20, 1981 4 ,
Page 7
The request to know the difference in impact between the 9,000 vpd and
34,000 vpd range of potential development options is somewhat mute since
most major arterials presently operate at or beyond capacity (please see
Police Department letter dated March 31, 1981) . We can understand that
the City would like some quantified measure of the difference in impacts
that would result from the wide range of options. We can understand that
they may believe that a detailed estimate of delay or some other measure
could be estimated. Unfortunately, the science of traffic engineering
is not as discrete as other physical sciences like hydraulic or structural
engineering. Often, people believe that the relationship between traffic
volume and the street system is analogous to pouring water through a funnel
such that when the water is poured in faster than it goes out, the funnel
overflows the top. In the case of the street system, this analogy would
mean that delays would simply become longer and longer. Fortunately, however,
cars are not like water molecules - cars have drivers who make decisions.
Experience shows that these drivers will withstand only so much inconven-
ience (delay) and then they seek some alternative (seek the path of least
resistance) . As we have discussed above, drivers will attempt to find another
route (pour water into another funnel ) ; change the time that they travel
(wait to pour water until the funnel is partially emptied or start to pour
in water before the funnel is filled) ; or choose another mode like transit
or carpooling (convert the water to steam so it can pass with less inter-
ference) . Because of the dynamics of driver decision making, there is no
reliable way to predict (at the level of detail requested in an EIS) these
differences.
Because many of the intersections on Rainier Avenue, I-405, and Grady Way
are already at capacity, it can only be said that these capacity conditions
will continue and that the peak hour time periods will become longer. If
the City chooses to actively encourage the use of transit and high occupancy
vehicle modes as suggested in the Seattle-King County letter dated May 28, 1981,
the length of these peak periods may be shortened. Unfortunately, there is
not an exact method to assess the level of impact that is likely to occur
if these mitigating measures are promoted.
King County Planning and Community Development (May 29, 1981)
It is intended that Monster Road be improved to a minimum two-lane roadway
with no parking. Right-of-way should be retained in areas where there are
existing or possible intersections with driveways and/or streets to permit
the addition of auxiliary turning lanes where traffic volumes warrant.
The funding for any of the improvements outlined is intended to be based
on a proportional use formula. In other words, the costs for improvements
to any connection with Monster Road and/or extension of the roadway along
the west side of Earlington Park should be allocated in proportion to the
71h8
Ms. Deborah Krouse >; Amp°.
November 20, 1981
Page 8 r@Vp
traffic volumes generated by this proposal compared with the total traffic
volume using the section of road that is improved. Thus, costs would be
allocated in proportion to the benefit received. Because of the wide range
of potential volumes that could use this road (because of the wide range
of development potentials for this and other parcels in the area) , it is
impractical to specify a specific proportion at this point. It is suggested,
therefore, that at the time a more refined development is planned for this
site, the detailed traffic analysis and traffic assignment be used as a
basis for determining the appropriate proportion of costs. Final determina-
tion of funding should be negotiated with the City using the proportional
use formula as a basis.
The westerly connection could divert up to 25 percent of the traffic generated
by the Black River Office Park and a like percentage of the traffic generated
by Earlington Park. This mitigating measure is recommended since diversion
of travel to the west would tend to slow down traffic growth on Rainier Avenue,
I-405, and Grady Way. Such an improvement would simply decrease the length
of the peak period in the vicinity of the project. This improvement would
not eliminate nor result in an improved level of service on these routes
since conditions already operate at LOS E (capacity) .
Seattle King County Commuter Pool (May 28, 1981)
The suggestions offered by the Seattle King County Commuter Pool are acknowl-
edged. The success of the recommended measures may depend largely on the
mix of tenants. In the event the office space is occupied by one or several
large tenants, the possibility for these programs to be effective is enhanced.
If, on the other hand, the office is oriented towards smaller tenants , the
ability to coordinate these programs may be somewhat diminished. As a supple-
ment to the mitigating measures proposed, it is recommended that these pro-
grams be monitored such that they can be adjusted to respond to changes in
the tenant mix and respond to the success and/or failure of any of the measures.
If the demand for carpool and vanpool parking spaces increases , the propor-
tion as recommended above should be increased. On the other hand, if certain
programs prove to be unsuccessful , it is not prudent that they be continued
at the recommended levels.
City of Renton Police Department (March 31, 1981)
It is acknowledged that much of the road system currently operates at capacity.
We do not, however, agree that every intersection or every road section oper-
ates at this level . We also generally concur that there is likely to be lc-;c.
increase in the number of accidents resulting from the increased traffic vol-
ume
that would be generated by this and other and-other- projects in the area.
While it is a general rule that the traffic accident rate increases once a
roadway operates at or beyond capacity, the traffic accident history in the
I,_
71h8
Ms. Deborah Krouse � ,
November 20, 1981 7 .40
Page 9
Grove
vicinity of the project does not support this generalization. Based on
several years of traffic accident history, the traffic accident rate has
been equal to or less than the rate of increase in traffic volume. The •
creation of the road system west of the site is not expected to measurably
reduce the number of accidents that would occur as a result of this project;
rather, it will simply shift the location where those accidents might occur.
Citizen Letter (May 27, 1981)
It is acknowledged that the mitigating measure to build a roadway connection
to Monster Road would have some impact on the preservation vegatation of the
western half of the site since either a direct connection to Monster Road
or the extension of the roadway along the west side of Earlington Park would
need to cross certain drainage areas and would temporarily disrupt the flow
of water and vegetation in this area.
Green River Study Group (May 26, 1981)
The comments offered by the Green River Study Group are discussed in this
letter and mitigating measures are outlined. A discussion of funding for
these improvements is also discussed above in the response to comments to
the King County Department of Planning and Community Development.
Department of Transportation (May 18, 1981)
The comments offered by the Washington State Department of Transportation
are acknowledged. The formula for funding any improvements outlined in the
mitigating measures section of this letter have been discussed above in the
response to the King County Department of Planning and Community Development.
I trust this letter responds to the questions you and City staff have regarding
traffic impacts generated by this project. If you have any questions, I
encourage you to call me.
Sincerely,
The TRANSPO Group, Inc.
David D. Markley
Principal
DDM/jk
Attachments
1
LEGENDe ' 1360-5100 N/A --
250-800 N/A
1984
PROJECT .M/ THE
GENERATED PROJECT
XXX AAA DAILY N
STY BBB PM PEAK. O
? �,
O 1360-5100 2860-6600
m w . 250-800 400-950
i
44 PROdIE4
•
'a•
• 450-1700 1450-2700 - '
60-200 160-300 1.6 1
LO1' i
Q i
• 1810-6800 13,490-18,400
250-800 2500-7050
•
' e":,,,, , 4''',i.. m_ici 4
• •,,N, . A .
. Powell Ave SW t � . • '7
° 1
11880-6800 I 11.880-16.8001 b
185-600 1585-2000 :i CO
. .
tit ty
d 0
40 900-3400 30.850-33,350 .
Lind Ave SW a 125-400 2375-2650
12237100- 000 l 1319650-22010 8J1
4
/ t
450-1700 10.200-11,450 1 N c N.
60-200 1210-1350 , 1, o a _
• � � 3
N //� I
N Y'
p Y1 F.
a N
N
i
N
liii N O ,44 t6e St
�
m
N R
' ,` 5p0'\Z 7SO
E Valley Hwy 44. ._,
v
e . '
y •
Hwy -441‘ aainier A S60
•
46.
an e `3630-13,600 66, �'6o0'�'j50 1
760-76,750 ®46•
• 985-6000 60.900-63,400 560-I800 6160-7400 j north+
185-600 i N/A l ` �
J I
1984 DAILY AND PM PEAK HOUR The
BLACK RIVER • PROJECT GENERATED TRAFFIC AND �
OFFICE PARK •
TOTAL TRAFFIC WITH PROJECT JJ
J
`�r�
1
. •
OF 1?4, APPENDIX C
A.
ci t$ z
PUBLIC WORKS DEPARTMENT
TRAFFIC ENGINEERING DIVISION • 235-2620
p MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON.WASH. 98055
9 �o.139gTF0 SEPS����P
BARBARA Y. SHINPOCH
MAYOR August 7, 1981
__H TO : David Clemens, Acting Planning Director
FROM: Richard C. Houghton, Acting Public Works Director
SUBJECT: Black River Office Park-
Please be advised that David Markley of The Transpo Group, Bob Thorpe of R. W.
Thorpe & Associates, Gary Norris and myself met to discuss the EIS for the
subject proposal .
From that meeting, we determined that the best approach would be a document
which addressed the overall traffic impacts of the range of possible developments
on that parcel of land. From such an analysis, we believe that we can develop
a "feel" for the appropriate scale for the proposed development.
When a definite proposal is secured for that parcel of land, the developer will
be required to do an in-depth traffic operational study to define problem areas
and offer measures of mitigation. This analysis will involve all critical
intersections within an area defined by FAI 405 on the south, Sunset Highway
on the north, Rainier Ave. on the east and West. Valley Highway on the west.
The above should be placed as a condition for all permit processes regarding this
parcel of property.
If you have any questions, please contact Gary Norris. Thank you.
GAN:ad
cc: David Markley ��1 In,F�n �`,^'- -:;
I ,
Bob Thorpe — -' :; ? !
C1 int Morgan r
rt .1 lr'
APPENDIX D
122
DRAINAGE ANALYSIS SUPPLEMENT
TO BLACK RIVER OFFICE PARK EIS
March 26, 1982
2
•
I
DRAINAGE ANALYSIS SUPPLEMENT
TO BLACK RIVER OFFICE PARK EIS
•
Hydrologic/Hydraulic Modeling •
There have been at least two comprehensive hydrologic and hydraulic studies
of flooding in the Eastside-Green River (e.g. , Springbrook Creek) drainage
basin. The first study of note was a Watershed Work Plan developed by the
Soil Conservation Service (SCS) between 1965 and 1976, to assess the impact
of a proposed flood control drainage project (namely, the P-1 Channel pro-
ject) upon flooding in the Eastside-Green River area. The second comprehen-
sive study of note was a Flood Insurance Study prepared under the sponsorship
of the Federal Emergency Management Agency (FEMA) . Both studies modeled the
Eastside-Green River drainage basin using the SCS-curve number method and the
SCS TR-20 hydrologic computer program. The studies also used the same design
storm criteria. Although the same methodology was used by both studies, the
results of the analysis are quite dissimilar. The reason for the difference
can be attributed largely to the judgments made in estimating curve numbers,
time of concentration, and channel flow velocities and in the attention given
to the effect that flow retention-detention-control structures have in modi-
fying the hydrograph. The SCS study also used a drainage area that was
approximately 3% (0.7 sq. mi . ) larger than the drainage area used in the FEMA
study.
•
Both studies used similar curve numbers in describing the rainfall-runoff
relationship for the future condition in the drainage basin. Therefore, the
total volumes of design storm runoff predicted by the two studies for the
future condition are similar. This similarity is fortunate since the volume
of runoff is singularly the most important parameter in determining the
elevation of floodwaters in the lower portion of the Eastside-Green River basin. 1
The time distribution of flood flow arrival at the pump station is also im-
portant to floodwater accumulation, but to a lesser extent.
1
1
The curve numbers used by the FEMA study for existing conditions are,
however, significantly lower than the SCS curve numbers; therefore the
runoff volume predicted by the FEMA study for existing conditions is
approximately 20% less than the runoff volume predicted by the SCS study.
For both present and future conditions, the estimated time of concentra-
tion and the estimated flood flow channel velocities are respectively
longer and lower for the FEMA study than the SCS study. The FEMA study also
includes consideration of a greater number of structures that act to retain
or detail storm runoff. As a consequence, the design storm runoff hydro-
graph developed by the FEMA study exhibits an attenuation of peak flows and
a much greater "spreading out" of storm runoff over time than the SCS hydro-
graph. Figure 1 illustrates the difference in the runoff hydrographs
developed by the SCS and FEMA studies. In our assessment of the two studies
we observed that the SCS study devoted much more effort to the development of
accurate curve numbers for each subbasin than did the FEMA study. The FEMA
study, on the other hand, appeared to devote more effort to the definition
and inclusion of channel restrictions that either detain and/or retain storm-
water runoff flows.
Stage-Storage Relationship
The Stage-Storage curves of Figure 2 indicates the volume of flood storage
that is available below a given elevation behind the Black River Pump Station.
The upper curve represents existing conditions and the lower curve represents
conditions estimated to exist following construction of the SCS P-1 Channel
project. The curves can be used to obtain an estimate of the elevation that
floodwaters will rise for any given volume of floodwater accumulation behind
the pump station.
2
The Stage-Storage curves developed for the FEMA Flood Insurance Study differs
significantly from the curves developed by the Soil Conservation Service and
the difference in the two curves resulted in flood elevation predictions that
• varied by as much as three and one-half feet for future conditions. The SCS
curve construction for existing conditions was based on 1962 aerial survey
maps with five-foot contour intervals. (1 ) The FEMA existing conditions
curve was constructed with a more recent (1975) and more precise Corps of
Engineers aerial survey map with two-foot contour intervals.
Due to the discrepancy in available data, our staff made an independent calcu-
lation of available flood storage using the most recent, 1980 Corps of
Engineers aerial survey map with two-foot contour intervals. The results of
our calculations tended to support the stage-storage relationship developed
for the FEMA study. (2) Consequently, we are utilizing the existing con-
ditions, Stage-Storage curve developed for the FEMA study but modified to
reflect a reduction in storage volume due to recent filling for development.
The stage-storage curve for the post-project situation reflects the excavation
of a little more than 300 acre-feet of soil below the fifteen feet MSL eleva-
tion for construction of the pump station forebay pond and phase one of the P-1
channel and assumes redistribution of the spoils within the project limitsbe-
tween the elevation of fifteen feet MSL and twenty feet MSL. This assumption
accounts for the fact that the pre-project and post-project stage-storage
curves merge at the twenty-foot elevation stage. Aside from the aforementioned'
spoils disposal assumption, if fill is imported into the project area the stage
storage curve will move to the left. Likewise, if excavation spoils are trans-
ported out of the project area the curve will shift to the right. The curve
presented in Figure 2 is valid only if the imported fill and exported excavation
spoils trade-off are equivalent for each elevation interval in the project area.
1Per the telephone conversation with Keith Busch, SCS, Spokane, WA.
2In developing our stage-storage relationship, all storage below four-foot
MSL was assumed dead storage. In addition, it was assumed that non-contiguous
topographic depressions did not provide effective storage below the level of
the surrounding ground elevation and that no effective storage was provided by
storage volume below elevation ten feet MSL, that was not contiguous with the
Springbrook Creek channel . It was allowed that these non-contiguous low areas
could be subject to seasonal ponding and therefore not be available for flood
storage.
1 3
' I
For example, it would require approximately 150 acre-feet of fill to raise
50.5 acres of the proposed Black River Office Park above the 17.0 MSL ele-
vation. It would require approximately 50 acre-feet of fill for each foot
of fill above the 14-foot MSL elevation. If all of the fill is imported .
from outside the floodplain area, the stage-storage curves of Figure 2 should
be modified by reducing the storage capacity available at 15.0 feet MSL by
50 acre-feet and reducing the storage capacity available at 16.0 feet MSL by
100 acre-feet, and reducing the storage capacity available at 17.0 feet and
above by 150 acre-feet.
Flood Volume Accumulation
The flood water elevation in the area behind the Black River Pump Station
is a function of the volume of water that accumulates behind the pump station.
The maximum accumulation can be estimated by applying the continuity equation .
(storage = inflow-outflow) to the storm runoff flows, arriving at the pump
station. Flood waters will accumulate behind the pump station whenever the
rate of stormwater inflow exceeds the rate of pump station discharge and the
accumulation will continue until the inflow rate receeds below the pump station
discharge rate.
At present, the maximum discharge of the Black River Pump Station is constrained
by the rate of flow in the Green River. The Green River channel has a design
maximum flood flow capacity of 12,000 cfs at the Auburn USGS streamflow gaging
station. Flows or discharges entering the Green River when the flow is 12,000
cfs at the Auburn gage are in excess of the river systems design limit and en-
croach upon the systems flood control safety factor. The Corps of Engineers,
who control discharges to the Green River, have agreed to allow the Black River
Pump Station to discharge up to 400 cfs when the flow of the Green River is
12,000 cfs at the Auburn gage. The agreement is purported to be a negotiated
privilege rather than a contractual right.
Assuming that the 400 cfs pumping allowance agreement is honored, the worst case
condition for flood water accumulation behind the pump. station (e.g. , maximum
flood water accumulation) is the situation where the design flood for the Eastside-
Green River drainage area (e.g. , Springbrook Creek drainage area) occurs during
4
I
1
a period when the Green River is at maximum design flood stage. Under this i
set of conditions the discharge of the Black River Pump Station is limited
: to 400 cfs. The best case situation (e.g. , no flood water accumulation) is --
where the design flood occurs when the Green River is at a level that will
allow the pump station to discharge at a rate equal to the rate of inflow to :
the pump station forebay.
An intermediate flood water storage design condition that has been presented
by the Soil Conservation Service is the situation where the pump station can
discharge at an unlimited pumping rate for a period of twenty-two hours, at
1 which time it must curtail pumping to the 400 cfs level . The twenty-two hour
unlimited pumping period is based on the estimated time of travel for flood
Iwaters released from Howard A. Hansen Dam to reach the point of discharge from --I
the Black River Pump Station. The rationale is based upon the scenario where
1 the design storm hits the entire Green River drainage basin simultaneously, '_ '
and in response to the storm the release from Howard A. Hansen Dam is imme-
diately increased from some nominal level to the maximum design release rate.
Still another condition evaluated is the situation where the pump station can
Idischarge at an unlimited rate for a period of twenty-two hours at which time
it must curtail pumping to a 300 cfs level . This particular situation is in- -
_1
cluded only as it represents the scenario used for the FEMA Flood Insurance
Study.
1
Table 1 gives a summary of the estimated volume of runoff accumulation and
corresponding flood stage elevation for each of the aforementioned situations,
with and without the P-1 Channel project and for both present and projected '
future levels of development. The results on Table 1 indicate that the design
^
storm estimated flood stage elevation behind the Black River Pump Station for
present-day conditions is, most probably, in the range of 13.1 feet MSL to
14.7 feet MSL, dependent upon the particular pump station operating scenario
adopted, and that these flood stage elevations will increase to the range of l
i15.0 feet MSL to 17.0 feet MSL without the P-l .project when the drainage basin _
has attained full development in accordance with existing land use plans.
I
5
rl
TABLE 1
FLOOD STORAGE REQUIREMENTS AND FLOOD STAGE
ELEVATIONS BEHIND BLACK RIVER PUMP STATION
Required Storage Estimated Flood
Conditions Volume (AcFt) Stage Elevation (Ft)(1 )
• 1 . Existing Conditions - Without P-1 Chanrel
a. No outlet - total storage 2900 19. 2 (19.5)
b. 300 cfs max. discharge 1100 15.2 (15.4)
c. 400 cfs max. discharge 970 14.7 (14. 9)
d. 22 hrs. unlimited pumping 640 13.2 (13.2)
2. Existing Conditions - With P-1 Channel
a. No outlet - total storage 3000 19.4 (19.7)
b. 300 cfs max. discharge 1230 14.6 (14.8)
c. 400 cfs max. discharge 1000 13.6 (13.6)
d. 22 hrs. unlimited pumping 650 11 .7 (11 .7)
3. Future Conditions - Without P-1 Channel (2)
a. No outlet - total storage 3500 20.1 (20.5)
b. 400 cfs max. discharge 1800 17.1 (17.4)
c. 22 hrs. unlimited pumping 1070 15.0 (15.3)
4. Future Conditions - With P-1 Channel (2)
a. No outlet - total storage 3600 20.2 (20.6)
b. 400 cfs max. discharge 1910 17.2 (17.4)
c. 22 hrs. unlimited pumping 1090 14.0 (14.0)
(1 ) Figures in parenthesis indicate flood elevation with Black River Office Park
site filled to 18 feet MSL elevation with imported fill .
(2) Future condition assumes compensating storage for fill such that the storage
at each elevation remains unchanged from the present conditions.
r
I ` !
With the P-1 project complete the range of estimated future flood stage I ,,
ielevations will be diminished to a range between 13.9 feet MSL and 16.7
feet MSL.
1 I;
The flood volume accumulation and the flood stage elevation are based on
the flood hydrographs developed using the SCS TR-20 computer model as modi- �--
fied for use on small computers by Tudor Engineering and the data base
developed for the 1980 FEMA flood study, but updated to reflect present (1982)
and future (ultimate development in accordance with adopted Land Use Plans for
the drainage area) conditions. ,-.
1
Local Storm Drainage
The 71-acre site of the proposed Black River Office Park is, for the most
Ipart, a fairly level , heavily wooded site of poor, ill-defined drainage, with
numerous areas of large, shallow topographic depressions that trap local
drainage and experience ponding following periods of heavy or prolonged pre-
cipitation. As a result, the natural retention and detention storage of the _
existing site is relatively large. Most of the site is at an elevation be-
1 low fourteen feet MSL and the groundwater table at the site is high much of
the year.. In fact, several of the site depressions have standing water 1
1 throughout all but the driest seasons. -
IThe site is bordered to the north by a set of Burlington Northern Railroad
tracks on a raised grade. Just beyond the tracks is a steep, heavily wooded 1_
1 slope (e.g. , greater than 20% slope) that rises to and beyond the Empire Way
Highway. (See enclosed map. ) This slope, due to its steepness, is likely to
remain relatively undeveloped in the future.
A field inspection of the site located three drainage culverts that pene- , -
1 trated the BNRR track embankment. Of these three culverts only the most west-
erly culvert appeared to discharge to a defined drainage channel , that
1
eventually discharges to the Black River channel just upstream from the
existing Pump Station forebay. Discharge from the remaining two culverts
. appeared to apread overland across the site in an ill-defined pattern, and
a large portion of this runoff, particularly from the center culvert, is
likely intercepted and detained in topographic depressions and only reaches
the Black River channel via the groundwater or after depression storage has
been satisfied.
The most easterly culvert penetrating the railroad embankment is a 24-inch
diameter culvert that discharges storm drainage from the Earlington Woods
Planned Unit Development located east of the subject site. Runoff from this
culvert is ultimately to the old Black River channel .
The largest portion of on-site precipitation is subject to the same fate as
the discharge from the two most easterly culverts. It is possible, however,
for worst case conditions, that the ground could be saturated and the de-
' pression storage satisfied. Under this situation the site could contribute a
rate and volume of direct runoff to the Black River channel that far exceeds
the textbook-calculated runoff for an undeveloped forested site. It is
possible that a wet-season storm could generate runoff from the existing con-
ditions that would be in the same ballpark as runoff from post-development
• conditions.
After development, stormwater runoff, either generated from or transported
across Black River Office Park site, will be collected in an underground storm
drainage system and discharged to the old Black River channel . Underground
detention storage will be provided if required; however, it is proposed that
the stormwater be discharged directly to the old channel to take advantage of
any period of unrestricted pumping that may be available at the Black River
Pump Station during periods of intense storms. (See discussion of Flood Volume
Accumulation. ) The Black River Office Park site is in such close proximity to
the Pump Station that stormwater detention appears to serve no beneficial pur-
pose and most likely would increase maximum floodwater accumulation and, as a
result, maximum flood stage elevation.
8
I i
Table 2, below, provides a summation of the estimated 25-year stormwater
runoff that discharges to the Black River channel from the proposed develop-
ment site. The Rational Method of Runoff estimation was used to construct
Table 2 . •
TABLE 2 ;!
I
ESTIMATION OF STORMWATER RUNOFF
FROM BLACK RIVER OFFICE PARK SITE
25-Year Storm Runoff
Drainage PREDEVELOPMENT POSTDEVELOPMENT(1 )
Description Area Max.Rate(2) Volume Max.Rate(2) Volume
(Acres) (CFS) (AC-FT) (CFS) (AC-FT)
1 . Black River Office Park 71 .1 28.4(3) 13.7(3) 55.0 20.5 i!
2. West Culvert 31 .5 7 1 .3 7 2.0
3. Center Culvert 15 4 0.8 4 1 .2
4. East Culvert (4) 51 .0 18.2 11 .0 44.2 13.2
I
(1 ) Post development assumes 80% of site will be filled and improved with
buildings, roads, or parking areas and the remaining 20% will be left natural
or developed for flood storage. •
(2) Maximum runoff rates are not additive due to differences in time of concentra-
tion. Runoff volumes are additive. -
(3) Assumes an Rational Method Runoff coefficient of 0.4 for runoff rate and an
SCS curve number of 83 for runoff volume estimate; however, runoff rate and
volume values could be higher as discussed in text.
(4) Consists of West Hills drainage area north of Empire Way (32 Ac. ) and
Earlington Woods P.U.D. (19 Ac. ) .
I
I
•
_, F - I 1
• 1 .
F. '{ SCS
250• • Future Conditions
200• • •
-
FEMA .
. � ', Future Conditions
�•S
L
150. . r 0�- r.,
`:,. S
Y_
i
® %.:®4
' •
}, 100' ®4449 44
o 4®
ik44474. 44. 44.4:s.•
400 cfs t" .� • -,-.,. ®��
• 1b . • 15 20 i 25 30 35 4b - 45
. HOURS
• Figure 1 .
. COMPARISON OF SCS AND FEMA STORM DISCHARGE HYDROGRAPHY STUDIES
r
I r....i w.rr r.rrd timrr• 11=01111 Wow/ tr.n.- Immeemil tpaic.y r.sra- ..ter t+aai.0 roar_ rouamrt u...Qll lidiligall taiMA rural.
25
g
co
0 20- Without Project a< y ,�y N` �� .� ...
i � � �'.
m
5- r,�,,
1 0
0
s 15 �RIA
®®®® With Project
s10 4e - --- .
W 'q'4
p,
0
J
5 ''
v`
-a
0
0
0- ,
0 1000 2000 3000 4000
Storage Capacity (Acre-Feet)
Figure 2
FLOOD STAGE ELEVATION
STORAGE CAPACITY CURVE BEHIND BLACK RIVER PUMP STATION
- I
43
6. Shoreline Management Program
The Washington State Shoreline Management Act applies to 200 feet from
either side of the Black River measured from the ordinary high water mark
and all associated wetlands which includes most of the site. The law
I
requires that a permit be obtained from the City of Renton for any
substantial development within this zone. The master program adopted by
the City of Renton designates any development of which the total cost. or
fair market value exceeds $1,000 as a substantial development.
The subject site has been designated as an "urban environment." The
objective of this classification is as follows:
"Objective
The objective of an urban environment is to ensure optimum utilization
of shorelines within urbanized areas by providing for intensive public
use, especially access to and along the water's edge and by managing
development so that it enhances and maintains shorelines for a
multiplicity of viable and necessary uses."
Comment:
Generally, the proposed action meets the objective of the Shoreline
Management Program. Access will be provided to the Black River.
Application for substantial development permit will be filed with the
City of Renton for development within the 200-foot overzone.
7. King County Sub-Regional Plan, Puget Sound Council of Governments
The Regional Development Plan (adopted 1/25/79) sets out a detailed
policy guide at the county level within a framework of regional
development goals. The primary purpose of the sub-regional plan is to
provide guidance to local governments in making growth management
decisions related to phasing growth, defining activity centers, provision
of transportation and utilities, and intergovernmental coordination.
Comment:
The proposed project is substantially consistent with the draft plan in
that the project would support the policy of concentrating jobs,
DRAFT
ENVIRONMENTAL IMPACT STATEMENT
FOR
If
BLACK RIVER OFFICE PARK REZONE
PREPARED FOR THE
CITY OF RENTON
RENTON PLANNING DEPARTMENT
RENTON, WASHINGTON
r'
•
BY
s- ,
R.W. THORPE AND ASSOCIATES
( f
Prepared in Compliance With
The State Environmental Policy Act of 1971
Chapter 43.21C, Revised Code of Washington, as amended
SEPA Guidelines, Effective January 16, 1976
Chapter 197-10, Washington Administration Code, as revised
i
r
TABLE OF CONTENTS
LIST OF FIGURES AND TABLES
INTRODUCTION iv
DISTRIBUTION LIST vii
SECTION ONE
SUMMARY
I. The Proposed Action 1
•
II. Impacts and Mitigating Measures 1
III. Alternatives Considered 12
i IV. Unavoidable Adverse Environmental Impacts 14
SECTION TWO
DESCRIPTION OF THE PROPOSAL
I. Name of the Proposal 17
II.. Project Sponsor 17
III. Project Location 17
IV. File. Numbers of Other Agencies Involved 17
V. Site Description 17
VI. Description of the Surrounding Area 18
VII. Major Physical and Engineering Aspects of the
Proposal 18
VIII. Relationship to Existing Laws, Plans and Policies 19
SECTION THREE
EXISTING CONDITIONS, IMPACTS, MITIGATING MEASURES AND
UNAVOIDABLE ADVERSE IMPACTS
I. Index of Elements of the Environment 45
II. Elements of the Physical Environment 47
III. Elements of the Human Environment 77
SECTION FOUR
UNAVOIDABLE ADVERSE ENVIRONMENTAL IMPACTS 98
SECTION FIVE
IMPACTS DETERMINED NOT TO BE ADVERSE 101
SECTION SIX
SHORT-TERM USE VS. LONG-TERM PRODUCTIVITY 101
•
1
SECTION SEVEN
IRREVERSIBLE AND IRRETRIEVABLE COMMITMENT OF RESOURCE 102
SECTION EIGHT
l
MITIGATING MEASURES 104
SECTION NINE
ALTERNATIVES TO THE PROPOSAL 109
SECTION TEN
REFERENCES 113
APPENDICES
A. Legal Description
B. Soils Analysis
C. Vegetation and Bird Report
D. Incoming Correspondence
Letter from the Washington State Office of Archaeology &
Historic Preservation
Letter from the Office of Public Archaeology
Letter from Mr. Jim Matthew, Renton Fire Marshall
Letter from Mr. Milton Reimers of Coldwell Banker
Letter from the TRANSPO Group
l
1 I
ii
i ZZZ
LIST OF FIGURES AND TABLES
FIGURES
1. Location Map xi
2. Vicinity Map xii
3. Conceptual Site Plan xiii
4. Comprehensive Plan 38
5. Existing Zoning 42A
6. Existing Vegetation 60
7. Noise Monitoring Stations 65
8. Existing Land Use 75
TABLES
1. Summary of Suspended Particulate Concentrations 51
2, Other Pollutant Concentrations 51
3. Washington State Ambient Air Quality Standards 52
4. Washington State Department of Ecology Noise
Limitations 67
5. Existing Noise Levels in Decibels (dBA) in the Vicinity
of the Proposed Black River Office Park Development 67
6. Typical Noise Levels at Various Distances from
Railroad Activities 68
7. Anticipated Maximum Noise Levels from Construction
Equipment 70
8. Immediate Abatement Potential of Construction
Equipment 71
9. Population and Household Characteristics and Trends 78
10. Coraparative Analyses of Alternatives 112
I
iv
INTRODUCTION
Project Sponsor
Alterra Corporation
2120-A S.W. 152nd St.
P.O. Box 66101
Seattle, WA 98116
Nature of the Proposal
The proponent is requesting a rezone of 71.16 acres from General
Classification (G) to Manufacturing Park (MP) in order to construct in
two phases an office park and rail-served warehouse uses.
Project Location
The site of the proposed project is a 71.16 acre parcel of land located
approximately one mile west of the Renton central business district. The
site is bounded on the north by the Burlington Northern Railroad right-
of-way, on the east by the proposed Earlington Woods Planned Unit
Development, on the south by the Earlington Golf Course (proposed to be
developed as an industrial park) and on the west by Monster Road and the
P-1 pumping station.
Lead Agency
City of Renton Planning.Department
Responsible Official I
David Clemens, Acting Planning Director
Planning Department
City of Renton
Contact Person �—
David Clemens, Acting Planning Director
City of Renton Planning Department
Municipal Building
200 Mill Avenue South
Renton, WA 98055
Tel : (206) 235-2551
V
I S
Authors and Principal Contributors
This EIS was prepared under the direction of the City of Renton Planning
Department; research and analyses were provided by the following firms. :
R.W. Thorpe & Associates
815 Seattle Tower Building
3rd & University
Seattle, WA 98101
Tel : (206) 624-6239
(Contact: Deborah Krouse)
Rittenhouse - Zeman and Associates, Inc.
Geotechnical Engineering
13837 N.E. 8th St.
Bellevue, WA 98005
(Contact: Craig Lavielle)
The TRANSPO Group (Traffic & Circulation)
23-148th Avenue S.E.
Bellevue, WA 98007
(Contact: David Markley)
Actions, Permits and Licenses Required
Rezone Street Use Permits
Preliminary Plat Approval Electrical Permits
Shoreline Management Substantial Occupancy Permits
Development Permit Sign Permits
Flood Control Permit Fisheries Permits
Final Plat Approval All other permits necessary
Site Plan Approval to construct buildings and
Grading Permit improvements proposed on the
Hydraulics Permit site.
Building Permits
Mechanical Permit
Location of EIS Background, Data
R.W. Thorpe & Associates
815 Seattle Tower
3rd & University
Seattle, WA 98101
Renton Planning Department
City of Renton
Municipal Building '
200 Mill Avenue South
Renton, WA 98055
i ',
' I
vi
Date of Issue of Draft EIS : April 24, 1981
Date Responses on Draft EIS must be
Received bythe Lead Agency May 28, 1981
Cost to Public of Copies of Draft EIS $ 5.00
•
Mail Comments to:
All comments on this Draft EIS should be addressed to:
David Clemens, Acting Planning Director
City of Renton Planning Department
Municipal Building
200 Mill Avenue South
Renton, WA 98055
•
.� I
•
•
•
rl
vii
RECIPIENTS OF THIS DRAFT ENVIRONMENTAL IMPACT STATEMENT
Federal
Environmental Protection Agency
Department of Housing and Urban Development
Department of Energy
Army Corps of Engineers, Seattle District Engineer
Soils Conservation Service, Department of Agriculture
U.S. Department of Interior, Fish and Wildlife
State
Governor' s Office
Office of Program Planning and Fiscal Management
Department of Ecology
Department of Fisheries
Department of Game
Department of Transportation
Department of Social and Health Services
Ecological Commission
Office of Archaeology and Historic Preservation
Office of Public Archaeology, University of Washington
Regional
Metro - Water Quality Division
Metro - Transit
Puget Sound Air Pollution Control Agency
Puget Sound Council of Governments
Seattle - King County Department of Public Health
Local Government
King County Department of Public Works, Hydraulics division
King County Building and Land Development Division
King County Planning and Community Development Department
King County Soil and Water Conservation District
City of Kent
City of Tukwilla
City of Seattle
City of Renton
Mayor
City Council
Hearing Examiner' s Office
Planning Commission
Public Works Department
Parks and Recreation Department
Police Department
Fire Department
City Attorney
SEPA Information Center
Planning Department
•
viii
Utilities/Services
Renton School District #403
. Puget Sound Power and Light •
Washington Natural Gas Company
Pacific Northwest Bell
Libraries
Renton Public Library
University of Washington Library, College of Architecture and Urban
Planning
King County Public Library
Newspapers
Seattle Times
Seattle Po t-Intelligencer
Daily Journal of Commerce
Renton Record Chronicle
Private Organizations and Others
Seattle Audubon Society
Greater Seattle Chamber of Commerce
Rainier Audubon Society
East Lake Washington Audubon Society
1
ix
PREFACE
This draft environmental impact statement is intended to evaluate the
environmental consequences of rezoning 71.16 acres from "G" - General (large
lot, single family residence) to "MP" - Manufacturing Park. The EIS will
I/
discuss the impacts of changing all or part of the existing undeveloped
riparian forest to an intensive, urban office and warehouse use. No specific
site development plans have been prepared; therefore, this EIS will address
only the environmental impacts at the general "land use" level . At such time
as site specific construction plans have been completed, a further EIS will be
prepared, or if appropriate, a supplement to this EIS may be issued.
11
In order that this EIS may be effectively utilized in the zoning review
process, this document will discuss both the proponent's rezone proposal of
the site in its entirety and three primary zoning options. The alternatives
$ are as follows:
1. Development of 75% of the site (53± acres) into warehouse and office
park use while retaining 25% of the riparian forest in concentrated
open space and natural habitat.
2. Retention of the east or west one-half of the site (35+ acres) in its
natural state while allowing warehouse and office development on the
• 'remainder.
3. No urban development or other action and retention of the site in its
entirety in the current undeveloped state.
'
i .
•
•
X
The alternatives section of this EIS, commencing an page 109, contains
a qualitative analysis and comparison of the three land use alternatives
enumerated above. Those impacts on elements of the natural and human
environments, such as earth, water, flora and fauna, and aesthetics are
xpanded in detail. Thus the alternatives section trill provide a concise11
reference for the City's decisionmakers in the rezone process.
1
11
r
11
11
X1•
I:Tke, ,0,-,
..::,
, -,,,,,,,,,3-:p.,. .. ti%,.','itZ•,'It;1"::: :- 11,:;...1.?,;:.:A*:=1:5,;.,t 1
''''''''A:::':'!"7:i=i4; 1::':i.s] :&•. '"?...:,;'.,''':07ei,',.MtPP;40,r;'.;gX"'.1
1 .
,
'..-. z .
,ivii,00082?,:. j_a_ '...-
'1/4.''''
. 'F''''''''.i- -;IM . . 'Yialii,...u1,14J.:;,04 .
. , kyme*. ,,,% .,o..iiii,.,. <:Nt k.
, r,
▪ )
,.....x.. -r---
. ,,,
N., t.... . .,::L.,,,„0
*. .
. ;,.,.%:4i.•:,":,, ,..03;`,Vg' •
\...***.
A.:t. ..„„.• .....,-..'-.,,:;,..:.;;: ,•
...
' 14.
• BELLEVUE
:, ,; :. •••?:,:aagioe..4t'fr,,:w:.-7,4 V,
-...-„,-,•
: .‘'i <,.%
)
- .
.,,.. e
.„A .........„. L.,:,..L.. .,..., .
., '. titc
:!Ai:!:'.:)'i,ff••••''?'4..''.VA.$;v4V,4,.. r.T ''' • 7,,,, LAKE
?..;.
•4 1 , ,,..09,P., ig,,,,i,,,,,,, •,, ki*T',W..
'' k;.:',fr,':•,...
i.',.,-,.,-1-4, . .? .:',:ti,'..,N)"."'ReiVAA-" ,::.
'-,i,,,,,N'zu. ':-..ffi.< '`.. ',.t' ''.4:t;:A.:),,,-.. , it ,far411160
,Ii']:::'!';::1!'r '..N':: :.:'.4 .-a,"---•,0 •• c,,,:::::? , 4'' ' .44.,'',1 :MMAMISH
••
. .
........,..,.. ,. .
. \ 1
„. ,,....y.,
„.„1..
- . , %,, . , • :klritirOP...'"),Offs4g40,' I
/ .
..
s ,
,,,,
,..
V.,•;40z,IrmirMA i i ik 1
') .., .Zioi..*I.k.
fiffj ',...M.,,,,,
Atm Site
iii.til '14.1P.4it".0.,
,.
'OM VIViii 4#11:11 eRENTON
::/.4,1 littai 7.
:ifEtNeri. UKW1LA
,4,,,,,--. ,s,..A.,,y,.y,t,,o
I
m4tt. . ,,...,
_LAKE_
,,,s•r,,,,
4':." 1.!..4,844.4";
:„..-, .
.-...:,k YOUNGS
...,
0 1 :;,:tyl:(V-471 ."4'<i At1/4.
..
4.4.fftn:!, 11,*'.
:I -V i '.q 4g4 *.%.
t.gl'c....
MAPLE
Y
'''4 AO
..0.,,,f I-';'>...if 4.`VirAVOC'l. • '
tv„,,wir t.g,...:,.: ,;46,k,440,,,, A.)..:...,4,.. ." . W •
' h
BLACK..
.,.
OAUBURN DIAMOND ...
_.
'..t:::A N".°•.i'aiS.;:>.: '',4W: ' 40
`....-.0
.Ej t., .•.,:,.16.-qrAi:'.0 §...,-.:
\VI:AWN'.
re ....„. ,t.,,,,,,,,,,,,,,,,,,,..
> „..t
,,,,
' Z..,v:;::,4v.'nf -z'.R.Zt7.-„, :-.,',,t .44 • i,..,..,: le- '.
41-4.0 . YN., ,:',;.1..,..:..•:..i
aw • FIFE
TAcoMtok .
,
.. .
I LOCATION MAP
BLACK RIVER.
OFFICE PARK
. .
.____
..,... NORTH R. W. THORPE & ASSOCIATES
xii • ,
-...:-' ''-',-;;-%. ____1_,--....... .'------ •••''.---.•-•, ',!;.':,'.",--i',5,:;.::,,„,.,,':'.,,••vi'f:Z,7Zi.,'::.5:-:":' ,'.'Z;;:,''..:$':::.;',';i•?4'•:7i,:'..., i:i.,: i1::::>:::;,:i.:; ':::,I%';',:::,-,.-.',,,,'..'S i:'',.;',•i''',..;.?.;?:,.?..'?',•,; :4t,'"\ ..';'="IL,7,1 ''''...':',':,,',...,:',?„::::-,7,'•.;:::::f.'..., :',V::.'.';::,::',"ci:?1, .
-----•=iy.-.-.7.,y,f,-----.... ;....,1....-7,,,, ,--,--„ -
.1:4-,---, ;,--.:,..,, , 4.:,. s.
*-:,,,,, 1---7,,,7•N ------,...._, .,,1,,,,"7:,,,tft:ii.,, ,,';:,...y:, .,,::<:;:.::,?•••,,;;'';.='...,::,:,;.*:;;;.::;c:p ,,,,..';: :::5'!""<;*".--V,-,,,;;-:‘''',-1‘..,:::7',''''''4',3:`,":2:-:-:'''.•';'..::•,.',..::;:,-2,',..,;:.t:? ,:..i,',',▪ `-' 4 F\i: j•J_;":",:±•\..:•'.. .,1",,,
''.:'-'''''',`:•',-.'-,-,„(,,LIar".--- .,---',,,,',",,,`,M,.;';1:4.., ::::',5?::::i,i':','X'2'... ..'.44:t.':,:i!!•:;: ::•ill.i:;•:',..,',.;•,:',",.:::,: :::::;', ;:.a.,-:-: ,,cf'5:.:1:.:;'::::,;2,...f-,": ":.i.';1.: ,== ;.,,;::.,.;:i-`:::',',. ;,'",t•1)\,!,'-;:s.-"--.1. 1 i,''7' --'• 4`.::%1:;,;:t-1';,i.
'I"1 'i,,,::::::::7;s:-::--1 '81,4,--- ..,',"..., e:::::.:;:.:1.;,-,,,,,,,2.,zaki5:,!,.;«;;,:;;;,;F:Ir*;:,:e.:':----"::,:`2.5:?..,;•>7.,T,tp:-• ;:,,,I,*^:: :0:::-`,:1:14.,°;;,,:::`,'f.:::,;,;;I,-'1's. ..(:: ::::: ',1'."P
4,?,,,,f;',4,,w;:e,',,e(
4..,-- .„-,,...,..,, „:„.„:„-..,,,.....::„:„..,:.‘,„..,;;.:,„.:.,..„._.,,,,...„,,c.,,,,.,..„,....„,......,„„,..,,:„..,,,,,,..,:.,.•„:„.„..„:„:„....::„,..„,„:„..i.;:::„..,...„,-,,,,..:,..0„,„.,.,,,,,,,,..„:„,„„Lt.:_zpv
< :&.,,''•:•,-,,s,:°,::,,t,,7=-..:1,-,c,\:,:•-!!,,,-.•,,t-',;,..s.z.,-,,..i'v•-•:•••^5?,,,A,.., ,. ,, .,::-•k::,.i,,,,:f•,-,,„,,,,':,;,,,4..;?•,,,,,::-i,••°,•.;,;,,::;•;,.:,:i.,;:.%.....,c;.;.:0,,,,,„::::1:„..;,:::: ,,, ,0 _,..,
7,,''.-- :•,t).412Li. 3:zz•:.2:;, ,,.<..........,,,;:,;.:.--, ":',!:;"•:,•:.4.,--A,P,..7:, ,: ,j,,;.•,,..4?..;;,. : ,,:,. .., . .:,•,,,:3,-.,.,,7:::: ,::.,,:,,,,,51,,,,I.,,•:,::0;,,,,:.,,,,,;:;;:•;,;:;.A.. ..5 ,U l,I,',. ;;•.. 1., ly•:::-7,---23 :,:;:i:::::<':::::,
/1 /' k.,............:__:::"',•- •::,':22-, ....:,...--...:___,...::„.„.„-":"4"'„,..„",,,,,,,,-,,,x;_f:,:::?:, :..:::: ,7,.4:!•;;;;:',0.,::;.?:::?, ,,f.:,,;!....., •:,::::::::t'!;l2,4;:,;""t,.*::::,,,•,',',,:lt,,,.::::°,,,,',:::,,..:-.,',4,:".;f::,•;:pe,,;:: .I,1..,..,1:,0 , _ _',.•,,..,i, •--'- -,:,,,,,,,,,i,::;,,,:,..,:,
I
-- ', -,.:,,,,,.._ ,, ...,.- ...,-- -•`•• -.:.'-1, '.!.,:*---:":77.-,."...,,-,,,.,,,,,,,,,,,:,ii,,,_7';'" ••.:':',0yl,,,pi,.:,:-;',. :,:',.41,i;,Me.:^n';':',--l.,?:,,V:::\.:4:".44,•Yrri:. :I--7,'''',-"''"--L,.' -'-',1'-'i''.:{'''r:r"55'14'.`T,
I-!i;V.../ I :L_._. ,,,_o''''' '," ,---•--„,:7,:„:„:::,„,',,,,,c,,,?-:.--- ,:-:----'"--,---4.f,,,.:.:1,.!•,:i,S.",:,:e;','",!!:,!-:.4%;04., : if.•,,,,A,":::,,,,,:;,,,.:::,:;:;,:::,7::.,:::/fi^:;',:f:.:;;;.,'7::::`,•,:.:;:,,l,`:::p?,; .";,,,,i .: ,...,','1
it((l''' ' _:)/7-7-IT-',"'„„- -.--.,,;,,::•,55:::;-- , • •'--1,-,jif,. .':V ",::fi-ii`4A-i:i:A"i`i,lili,.:',,,,:;:tii;,)j,,e-'- '-..ii;itt .1,, !i„ „iL,'',•.,
.kk'` ‘----1------;_,Ziri ;-":"1 -1-='-----11:: -------„..---'-':,i•',.,'JtktA:Zi'-TiVr:iiV4,2:5,'"iN.Ui.--,`•. .,i'-':.1;ri .N::::,'iii'!:-:',4°..:?Xtl. ,":•V„-,6'
--"i-----'- 1 y -,------ ,,-------: ---, '`,.'",,,•,,,,'",,'",i,:i:.1;=iiMi.e•,?tiits .,,ik,§::-:::]:„iiiiit0'.:',:5-;i,,ii,..• ;:: :27ii,'-.,'ji'-',•‘',7-,,-"77.:',iij?2ir--7,776--75-i:,-,--i.'--7;M:17''iti(j7;,: iv4 ,
'0 .12:i'Z•,:,--,...,-,,,/,./ it / ,,,-„,--- +_______.>,,,,., --,,,,, v„,,,„44.:_-„,,,,,c,,:;;;,,,ii,i,,,iii' itfi'i-ci.,'•*ii,,,i,:i;.,,t.-iii:pitf„i•:•,-:.rii:iiii:, --,;,,,-.-',,=ik---,• '•\''' --.,-,,,, ii..iii•,:z,',:,-fki,,--, :ii,:,:ifi,, ii,'„1:
'"' .r''''t' ,"17 "---''`i ..-r-----'•-"---• :::::;-,77,777-''i---,.-"----,,,.. 's-;,,,S\''•":',Iii":":.,Acti,i -i.',i':.'i:!_17-:;:i71!,'Is,;i,--;:',.',c:ii§31-',if;:i;--;e:it..ii°,'•,-'7,f,'-i,;;)• IiiZ.2'•-•,,, ,,•,-',i,'A ,,,,j.,--,.••••tiL_,,,i,,,,,,, ,,•, ,,i.i .,?.',,iAi,,Vft
-•-,••„<":,,,, -,,,, -,,,,,....:,:•\;•‘•i. ....:44,P,,,,-,•;.v,-,-,,ti.,:,,,k ii!,°:•:,•-•:,,,,,,,,,,,,,7...ow:,itf/IA. ,, i,,\,,,,,,,,,t,• -- _. ii•-•-i,,,-.;.i,,,p,iii-:'4.::,,,i-,••••,c.ici i-i-,--v
V,--4-4-..,, , ..--4 ,....-,f, (//,/y.A-:.i,.ii4dIR..6.41Ji!!.;! !!!q!!!,!!,:!!!!!!1!,!:.,.'%•,. •) \,,,,,, ,-,,Til`i,,,.ii.-AXiii,:,'„: 1•4 .-R!...','.'„,;:,,-;-,:i.,'::•:;"-frt(V;,,''-giii1-.‘-;--,<-4 ,\A**°,', -\'''. '4...,ii;,:',iti;ii2,,4F:';',:i...k,'-,"-:',,,i' ff,
' -,\:-.,,i_l',4,„,,,-":"" 4:P i 1\,,,„„,,,,<-,,,,,',...;,,,,..-girrile.Z .,•::.0',..,,'''', :i '4\ '-\.., -r--_::,,,,,4,-,j,,,,,..-:4-, i,-,,,;:,;.....i.:siii3,i,a,gs•iiiit i-) . \:\,,,,
,. , .;•::-I-..,„,.; .,,Z4.),ii, '00.........1_,; a "*".i•iiiii,ii.,°,!-iii-,,,,v,i,-„,,,Y\: i.,\,„i2,i,i,:,..,,,,,, ', \,,.'Ws:\ ' ,.,,,,,,:,.. ,,i,,c,i,-;:-.:,:i?„.,(_,-tcfp:::4,ii3.1.,q,:.1,
•-,.ii,,,,,i, •:,...,,i;.:'..-.
7.' ' ...'') i i..'S.''*': 1".:^:-...,:e,.:...: 1:.?.. ' ','''!."'',1%:''''',0:4A'::.' ,i'!..;:: :'.' ...'4.'.! .:.f..,',r.".",N,‘'.:,,...::;i::----.5Z,j., _EAR LI NGTOIV WOOD ",',,,, ...,,`"\•.1-1---•".--:•••,:;iii'6-i'-'n'''''--ir ,
%,/,,,;,-,, ,, :-;,-..„ ,,,-.-,1,:f;,i,„,f,..,i,.:,,,,,,,.,,,,,,,,,,,,i,,,,, ,,,,i-) ,,11.,i,i:',i.,.,-.•,.:-,:4.,,,,i,..:,,,i,-...-,,,,,::ii,ii,:,',,',..,,, ::-.---'•••---ts„,._,,,,-„_,::.......I\ t tr*,..pU 0 %‘,., --- ,„,c,,,i---,'..!",-,•ii-,:if.;.,-•-•::',,•:•,,i:Iii.-2.rliifii.i'i:(c...ii.`i,', •i'•••f.
'''k,`„..),.,„,.„-4,,,--3,--.1-ist.:,\M?:.. ,:ii:; ....0,i-..'ilit:••; :ii,
-,..,''" '';'.i ,-------.; t,-`-'-.,. i> '?ii, ...,, , ,,,,i, . , ;i1M:`•:,,,,:
-,...,, .1.„
.E A R L I N GT 0 N PARK_ vi -'''--,''',:::,_,''"1-'7:*'::--L--,---'''''-'-'-' '''''''' -1,„.4,,.:777:----,,\:\Ll/7') i,'::1.:142.''''''\'''-::17/,',//41).?..,:',:•'''iii".;7,1,•7:;;'::i'r: ::.°;!..3 :1!;I:;71!
.'S_ ,V\*-, (PROPOSED)
? . ' ' i • ...-r /:, . '-...-•....,`'..:;k:,:a......,44.ra.4.4'4...........Z.'-'-' •.--fj i ---—'. ': •- --.M-Y\—--•——'----—,c.---•. ----' ',L.".417"7-
...----"7C77;41:k\
1 Lj,:: ,,_,,,„.1 9,, ,,,,,,,,...,1;*li ,I,,,1 II i 4.4:5, _.---1010.,•,,„,„:5•'F'i3\'';
.,,,., ,,.--:-1. 13 ., '1 ;-,-.7 irq , ii „,',, ..,-:71 'I 1 .'
.k1.1._
\
.,....,7•Cs . '
.":_i N'.,.,:‘A,. • ('-'-'-..----P";',' 1\ I,:i i..*$.1 I'7.:'j1., '
:;EARLI ' 0-,-nti.,mici._z,iii.‘i- •-,,, ("A\ Golf Course
,.„.--:--;-:--it,„!!,• l;'. 1
•,i7.- :..,s' = ,_,.....-----;;;;-;-'-:71. il .',J t ,,, L'I 1,i
- ..-t4, -::.--,.,--,.----il, " il ',•,„ : '.. 11 ,
_ ',::!•11'i'll \ 1111,1-(CI5-rc:0,0\-‘,_'.,-,,,3 ,..' II!
Nisio„' ''"/,--......-,-......,--,.....,-*i, ,,t, t• .,,,, qi
s,1
1 "••$_NI.\\\\.i? „---,-,52, t.,,a, • ;1 ,cr,( .........._„--- -; :_f_:...,,,,:;:t --,,,:,, , ,1,'. ,----,..,1 t
„ill p. ...---. ..,---. 1..,, ,,. .P,A -• , ------1:---,--' •
''''.•:::" •,,,1 3-°.-.i'-'''„--•-'-"'"---'-''75-'''f'\q.•--' .. -,z.:j 1 t: !ft-\tv, '''' ;',71.!'t-'.."ik Sewage , Or.„_..,...r.,,,-...._.----"-i „.„1„--,.-„.:-;.rig; ..' ' .,,,,,,,f.1;.e..r,,,,, .6 ,,,,, c ,..., !-.17.',!
\l,,,,,' . .-‘-•i,2.„...J.,-..-::;--•„ ir „,„ ...1.:.....i.„.,.:1 ‘-4,1 ,s,‘,„ ..........:,,. .,..,;_,.,2,..,,,,,,,,-,, .
40,4 .-- '7:::::2,_-:91. : lra:;:„,7_,:;::;;1i,;,:in,':j:':„_':::i'::':':,\i\:::,\A.,::::tv71:..:1-4-:'":„._:.::::,_Tclj:'1,,,.4*:t,i.7;„'-';:17:.,Fr;„:',...;:'''jr,la ...:1[\.f::::',-;1:7'tji''; •L 2
/ \,,,.,,.., s • ,... 0„,„....- „...„,,,,...:
,,,_-_-:::,, ,,,,.„,
. „ . ,„,....,..,„ „1„,,,,,,,,,,.„. ,,,,2. ,r ,\N\\
....• i • „,,,,,..„.:4„,:::.\\\ : /2›.- 77.-•-„,-„.....-_,,,,,--. , 1 1 . ,,. , is,,c„.v. / 1".r, --"A' .3 ."'.!
::•.'-.'"Z:-....;,,-.--,..,,.1 .s. —)-1\k\ ..`‘,,,,,,,....-:;,..-- -'''' a'' 1'.
.. ,. a m - t ..-".'N,•\-'),::.,11,5:1 i Ile. Is 'I: ' :I 0,
,'.'`;'''\'', \\''.4 -•--,""••-•-•=7.-.V:\‘‘i' '.,•;;;;,::',.:-,',74`'-'0.;."5':-!--'''':" r..-1,2 k.--,r,i ' BM!:16 ,
.....---,...,...41/ • 1,..1!1°.,))
ii t\ a '•'''' '44i ,1:1;t:.',:ti.::.'I,.,, _
,i, '1.:1Vi.7,21:1,'' * ‘ ';'''' I 1•E31 I, . 11 '1 A4
Longacre \'1°. 1 1-1•:,,,,,, ,,'''''''''''1,j',. *,+ A'si:;:: 1' 0..i..PJ .
GV rap. 1,', .t
.. =......-.-. 11 il
• \\\‘‘ '\
j I Ir..11c-ay I
• lt,tr'/ i
9
24._.--„------4\.i), ' IA'''"v,...,'011'r3 i I 1 1,--.7j 1 R/O•erc to,,,,o, li , 1V1i
i 1.1
(((\\C\N \'
. -jillil 4 , i
i.,
un 0.......,___;_t,„_ ....._,...-1::-.... ,, 1,., i,
i==II , i ,
,--,Li/ 1,:iilifa,.,,,-..----L-...77 ',,. 1 Of 1.7.z m 1 .. , 1 ' .11\r-A ,
E ` 4-_,4.44,d': p,
g ,,:i 1 ..., 1 , 017 ...„:Z4.‘ a \lia /
'''s. ,gt. 0 I...,,1 II 1 tn, 1 III L,_ .,..,„,„L,i. .
i 0 A
1 1 1 ,-,1-7.1 Track it:a all I a 1:Li \\\\\‘'N\ d •:"....if a lc r'ill 73 \
' i '' ,•\: 0 i a La l'' 13‘1117.'
.._. C,--i ‘,--- ! . .. ii I I i .A'‘''", 1
, r....-,1 C31 il
i—
.:..4; 1 i r':9,-,y-• ,, 4\ Pill 1. i i..'-, ?‘....s----...."'•/ pz=1 iza i 1 . , 77'.---- i ,0 (,),1 4 0
0 I i:,1 r....'.A.--v 1. ii7,iit ISM 1.49 i . -----• f, ii il (-------11 1 wis 6';."...., 1
I
0 I Lg i 4••,,, '
ri
`lip II El 1 ll .) WI 1 HI
V-L-41L-..) C-11 -----1 -,-,-----2) •
I Mil Reservoir ,s,,,,‘
1 1,
--- -
. I
•
• , .
i .
2 VICINITY MAP
1000 2000
BLACK RIVER
homimmom61.1 •
+ USGS BASE OFFICE PARK
. . . .
NORTH R. W. THORPE & ASSOCIATES
'I
. .
BLACK RIVER
. . OFFICE PARK
PHASE 38 I PHASE 1 33Acres RW THORPE AND ASSOCIATES
BM' ,:•�
- - Rfl.....1. ,AN.
,d-oktSIOR_
�71, o7.1N g „y 0100 400 800 NORTH
o s'.'
id`°io1/ are. 0 �,� 6 o aso0e0000Po, �vl A
�'v r p e. ` •'• e_ ,00 y
•,p°a 4, �� I' �4. sa4,1.ao�J a ' e.,
�0 a'� It �*, �d d ysl •0,.. In ••i ,,
do...
, • ' O ,, CS fa.y /J .I,V 0 .a 'off..
.p a t, j • • 0 •
Q
01,0;`�� s co. oaf 9�ecoo sd���� 1'.�Op a0 o _ !,. B�qq
4 0o � a�i, \ w e o O e' O
O:a ,d! O , ed ee� € /004q OOo'�OOp I-- e t i_ �a
o "O !0� ° O // a ** i9 ri . L o *NV `• s.A•
✓ e �o o _ a ea Qp o, a rw o�aS"poi e� e°s•�s a�e`�.,.
w Aoa.q �.pi
OI11 eto:•''"A..e°O„e0so i� \ W+ !� .. dill— �, — u` :1a'a1ti : l; _ a l, P 1 u VELOPM NT
P'1 cHq NNEC `_ i / !/) :up /I
m
33 z ` ___ _.
• \ /� • NORTH
' l _\ f
0 -I
aC .
.0a
mr •
ro,„,„. N • .
om
- ):,
r •
n2 . .
'• 1
SECTION ONE
SUMMARY
I. The Proposed Action
J The project sponsor proposes to rezone a 71.16 acre site from General
Classification (G) to Manufacturing Park (MP) designation in order to
construct, in 2 phases, an office park and rail served warehousing.
Future environmental consequences of specific on-site development will
be addressed in more detail in future environmental documents.
Off-site improvements may be required to serve this proposal , or this
proposal in conjunction with other developments anticipated in the
future in this area. These include improvements to the P-1 drainage
channel (see other Governmental Services, p. 86 ) , and construction of
the Valley Parkway.
II. Impacts and Mitigating Measures
A. PHYSICAL ENVIRONMENT
1. Earth
a. Geology and Soils
Impacts
Import of fill and reposition and cover of topsoils due to
excavation and filling activities.
Mitigating Measures
Excavation and grading operations on the site will be performed in
conformance with the City of Renton Mining, Excavation and Grading
Ordinance
b. Topography
Impacts
Topography will be modified in order to create buildings and road
sites.
11 Mitigating Measures
Topographic changes could be restricted to limited areas of the
site.
2
c. Unique Physical Features
Impacts
11
Development of the proposal will necessitate removal of 38.6 acres
of the 59.5 acre riparian forest located on the site.
Mitigating Measures
- Existing vegetation will be preserved on significant portions
of the site.
- A master landscape plan will be prepared to ensure good design
practice and preservation of as much of the riparian vegetation
as possible.
- As many of the existing trees as possible should be retained
through maintenance of greenbelt areas in order that large
groups of trees and understory remain undisturbed.
- The Black River Channel will be protected by a 50 foot setback
from the top of the bank.
2. Air
Impacts
There will be a short-term increase in dust and fumes during
construction. Over the long-term, automobile-related pollutants
will increase as local traffic levels increase.
Mitigating Measures
- Low emission construction equipment will be used whenever
possible. '
- Measures to control construction dust, such as watering,
11
cleaning and sweeping of streets at the end of hauling
activities should be performed by the contractor.
3. Water
a. Surface Water Quantity/Quality if
Impacts 111
Increased surface runoff from the site as well as increased levels
of polluted surface runoff would result from the proposed action.
Alteration of runoff characteristics will occur in that diversion
of stormflow into ditches and storm pipes will prevent water from I
/// flowing to low lying areas and may cause some drying up of wetlands
that will be preserved on site, unless storm drainage measures are
undertaken to protect them.
is
3
Mitigating Measures
- Temporary detention and settling ponds should be utilized
during construction of foundations to collect silt and minimize
turbidity.
- Stormwater runoff will be collected in a storm sewer system
approved by the Renton Public Works Department.
- Oil/water separators should be utilized to remove petroleum
products from storm water.
- Adequate street and parking area cleaning and maintenance of
the stormwater system should be provided.
- Catch basins and screens should be included in the stormwater
system to collect litter and debris.
- No development will occur within a 50 foot setback from the top
of the bank of the Black River Channel .
b. Floods
Impacts
Fill material will be utilized to bring building sites above the
100 year flood elevations.
Mitigating Measures
- Fill material will be required to bring some building sites
above the 100 year flood plain which will prevent on-site
flooding.
- Some areas could be left unfilled which may reduce the amounts
of flood storage displacement that occurs on the site.
r '
c. Groundwater Quantity/Movement
Impacts
Project development would result in an increase of impervious
surface on the site, which would decrease the amount of
infiltration of precipitation.
Mitigating Measures
A reduction in building site coverage could require less filling.
4
4. Flora
• r�
Impacts
Approximately 84% of the site consists of a unique wetland
deciduous forest, a part of the largest forest of this type in the
Seattle area. As a result of the proposed action about 78% of this
riparian forest would be removed and be replaced by building
li
foundations, roads and parking areas. 4,
Mitigating Measures
- As many of the existing trees as possible should be retained
through maintenance of green belt areas in order that large
groups of trees and understory remain undisturbed.
- A master landscape plan will be prepared to assure good design
practice and preservation of as much of the riparian vegetation
as possible.
- Placement of building sites, parking lots and roads should be
based on tree inventories provided by field surveys.
- Vegetation along the Black River Channel should be preserved
and maintained by the proponent.
5. Fauna
Impacts
Removal of most wildlife habitat and reduction in most native
wildlife due to intrusion of human activity.
1
Mitigating Measures
- Landscaping materials that provide food sources for birds and
small animals should be utilized.
J_t
- As much natural vegetation should be retained as possible.
- Surface water quality along Black River should be
preserved by planting natural riparian vegetation along the
drainage-way banks and maintaining wetlands wherever possible.
11
5
6. Noise
Impacts (Short-Term)
Noise levels will increase considerably during construction
activities with frequent noise peaks depending on the type of
equipment used. Traffic noise will increase on adjacent streets.
Mitigating Measures
- Noisy operations should be scheduled so that they are not
concurrent.
- Phased development should be planned which would reduce the
size of movements of construction noise.
- Construction equipment should be operated only between the
hours of 7:00a.m. and 7:00p.m. Monday through Friday.
- Only construction equipment that does not exceed State of
. Washington maximum environmental noise standards should be used.
- Construction equipment should be placed as far away from
sensitive noise receptors as possible.
- Construction activity should be scheduled so that all truck
traffic does not occur concurrently in order to avoid vehicle
- ! congestion.
Impacts (Long-Term)p
Increase in traffic and train movements will result in a
proportionate increase in noise levels. Increases in noise levels
$ due to human activity at the site will occur.
Mitigating Measures
- Landscaping, careful site design and berming should be utilized
near main roads to deflect noise and reduce its impact.
-
See "Vehicular Transportation Generated - Mitigating Measures,11
1/
- p• 81 •
Installation of rubberized railroad crossings where the access
` road would intersect the railroad spurs to the south of the
site would decrease noise generation.
6
7. Light and Glare
Impacts
Addition of low level lighting on the site. The traffic generated
by the site will increase the incidence of headlight glare. Some
glare will be produced by reflections from windows and possibly the
buildings themselves.
Mitigating Measures
- Building wash lighting should not be used.
- Perimeter landscaping, fencing and berming, especially around
parking areas and road entrances could reduce light spillage.
- Parking area lighting could be directed so that no direct light
spills off the site.
8. Land Use
Impacts
Change in the land use from old growth riparian forest and open space
to office park with warehousing.
Mitigating Measures
An alternative development design with limited building area could
retain significant areas of the site in open space.
9. Natural Resources
Impacts
Removal of most of the existing vegetation and open space on the
site. Consumption of some natural resources for construction and
maintenace of the project.
Mitigating Measures 11
9 9
Building elements could be analyzed for use of techniques, wherever
possible, permitting recovery of materials used in construction. 11
10. Risk of Explosion or Hazardous Emission
Impacts
There will be a slight risk of hazardous emission or explosion
during construction and potentially from future tenants.
Ai
7
Mitigating Measures
None.
B. HUMAN ENVIRONMENT
1. Population and Housing
•
Impacts
A slight increase in local housing demand may result due to
employees desiring to relocate near .their work. Also, day time
population levels at the site will increase to about approximately
4,100 permanent employees.
2. Employment
Impacts
Increased short-term employment during construction and long-term
employment once the development is complete.
Mitigating Measures
None.
3. Transportation/Circulation
Impacts
The proposed Black River Office Park is anticipated to generate be-
tween 9,070 and 34,030 vehicles per day and between 1,250 and 3,970
11 vehicles during the evening peak hour. This additional volume will
exacerbate the existing congestion at most of the intersections
along major arterials.
• Mitigating Measures •
a) To reduce potential safety hazard, Monster Road should be
upgraded to accommodate heavy trucks and increased traffic
volumes. This may involve rechannelization and possible
signali7ation of the Sunset Boulevard/Monster Road inter-
section.
8
b) To discourage the use of single occupant vehicles, the City
may consider limiting the number of required parking spaces
to less than is currently prescribed by the zoning code.
c) The road proposed to be constructed along the west edge of �!
Earlington Park, to the south of the site, could be extended
in such away to provide westerly access from the Black River
Office Park, in order to reduce traffic volumes that flow
through Earlington Park.
d) Establish a new bus route or modify an existing bus route to
pass through the project.
e) If bus service is modified to be convenient, provide bus
passes as a company or office park benefit.
f) Office park management should advise tenants and their
employees of the advantages of fleet ride, vanpool and car-
pool programs through a package of information provided at
initial occupancy for each tenant and coordinated through the
Seattle-King County Commuter Pool agency. Office park manage-
ment should also schedule public information meetings for
employers and employees.
g) As much as practical, office park management should encourage
employers to initiate a flextime work schedule so peak period
traffic can be distributed more evenly over the 3:30 to 5:30
p.m. peak period.
h) Any roadwork on-site could be conditioned to allow open at all
times a portion of the road wide enough to permit emergency
vehicle access.
i) Grade an alignment from Thomas Avenue S.W. which would intersect
the road system on-site with a gravel sub base wide enough to I
allow emergency vehicle access.
j) Disruption of traffic flan in the internal road system could be
minimized by installing utilities, within the right-of-way, but
outside the roadway proper.
8a
4. Public Services
a. Fire Service
-�, Impacts
Over the short-term, construction activity may increase the
hazards of fire fighting. Construction of the proposal would
significantly impact the fire protection responsibilities of
the Renton Fire Department. This development, coupled with
future development in the area, would necessitate improvements
to provide timely first response capabilities.
1._ Mitigating Measures
- Sprinkler systems installed in buildings per City Code and
Fire Marshall 's requirements, will reduce the amount of fire
flow required.
- Non-combustible building materials would reduce risks of
fire.
) - Industrial tenants could be limited to uses that do not
utilize flammable materials.
b. Police Service
Impacts
11 Demand for police protection will increase.
Mitigating Measures
- Tax revenues generated from the development will help offset
r' the cost of additional service.
fj
9
- Internal security systems could be installed in the building.
- Exterior lighting should be placed at strategic locations to
provide, additional security measures.
c. Hospital Facilities
Impacts
The proposed project is not expected to significantly affect
usage of the Valley General Hospital .
Mitigating Measures
On-site first aid facilities within major buildings should be
provided.
d. Parks and Recreation
Impacts
Development of the site will preclude any future development or
designation for park use.
Mitigating Measures
None.
e. Maintenance
Impacts
Increased demand for City maintenance of streets, water,
sanitary sewer and stormwater drainage systems.
Mitigating Measures
None.
5. Energy
Impacts
.Increase in demand for electrical power and natural gas and
possible increase in demand for energy associated with
transportation.
I '
10
Mitigating Measures
r.�
- Insulation in roof, walls, flooring and glass should be
utilized.
- Energy analysis of building design should be performed.
I j
6. Communication
Impacts
Increase in demand for telephone service.
Mitigating Measures
- All telephone lines will be installed underground.
- Installation of telephone lines will be coordinated with
installation of electrical lines.
7. Public Utilities
Impacts
Existing water supply and system would experience some
additional demand. Deterioration of water quality entering the
combined sewer and storm drainage system is possible during
construction activities. In the long-term, the quantity of
water entering the system will increase due to increased
impervious surfaces on the site. Also, project development
would generate increased solid waste and sewage flows from the
site.
Mitigating Measures
Site runoff will be directed to the old Black River Channel
where it will receive wetland treatment prior to its discharge
into Springbrook Creek.
8. Human Health
Impacts
Increased noise levels due to construction, traffic and other
human activities may affect the health of nearby residents.
11
Mitigating Measures
- Noisy operations should be scheduled so that they are not
concurrent.
- Phased development should be planned which would reduce the
size of movements of construction noise.
- Construction equipment should be operated only between the
hours of 7:00 a.m. and 7:00 p.m. Monday through Friday.
- Only construction equipment that does not exceed State of
Washington maximum environmental noise standards should be
used.
- Construction equipment should be placed as far away from
sensitive noise receptors as possible.
- Construction activity should be scheduled so that all truck
traffic does not occur concurrently in order to avoid
vehicle congestion. •
9. Aesthetics
Impacts •
Visual appearance of the site will be altered.
Mitigating Measures
Site design and retention of some existing vegetation will
soften the impacts of the bulk and mass of buildings.
10. Archaeological/Historical
Impacts
Project development may cover potentially archaeologically
significant portions of the site, specifically Duwamish Indian
sites. (Refer to the letter from the Office of Public
Archaeology in Appendix D.)
Mitigating Measures
The Office of Public Archaeology of the University of
Washington will conduct borings at 25 meter intervals in the
areas considered to have high archaeological potential and at
50 meter intervals at other undisturbed areas to confirm
specific locations prior to development of the site.
, I
12
11. Economic Factors
Impacts
The project would create short-term construction employment. ,
The development would also partially ease the demand for
industrial building space. The City of Renton will receive an J
increase in tax revenues and municipal costs generated from the
project.
Mitigating Measures ' _}
None.
III. Alternatives - Please refer to the comparative analysis in Table 10 on
page 111a.
Alternative 1 - Development of 75% of the site with 25% in concentrated
open space.
This alternative is slightly greater in density than the proposed action,
but the site plan would be so designed to allow 25% of the site to remain I'
in concentrated open space. This open space would most likely manifest
as' a greenbelt of varying width along the old Black River Channel and
Springbrook Creek located at the site's southern perimeter.
Impacts
This alternative would retain approximately 25% of the site in its �`
natural state as a riparian forest. The impacts of this' development
alternative would be slightly greater than the proposed action; however,
the difference in impacts is not readily quantifiable. It is expected
that this alternative would generate slightly greater impacts in the
following elements: soils, topography, erosion, air quality, runoff,
flora, fauna, noise, light and glare, natural resources, employment,
transportation/circulation, public services, aesthetics, and economic
factors. When definite site plans become available for review, specific
differences in impacts can be assessed.
13
Feasibility
According to the developer, this alternative is economically desirable
and feasible. However, the increased impacts caused by an increase in
density would reduce feasibility with respect to service from city and
public utilities, as well as diminish the acceptability of project
development in regard to the physical environment (soil , topography,
runoff patterns, flora, fauna, light and glare, noise levels and natural
resources.)
Alternative 2 - Development of 46% (33 acres) of the site with 38 acres
remaining in open space.
Description
This alternative differs from the proposal in that building would occur
on only Phase 1 of the property with the remaining 38 acres (the western
one-half of the site) preserved in open space reserve to mitigate the
development impacts.
Impacts
Overall , this alternative would place decreased demand on thehphysical
environment. Specifically, no development would take place in the
western portion of the site. This area would be preserved. as open space
which would eliminate the impacts on soils, topography, runoff patterns,
flora, fauna, light and glare, noise levels and natural resources for
that area. Impacts to the physical environment in the developed areas
would be comparable to those of the proposed project.
Impacts to the human environment (public services, utilities, energy and
archaeological resources) would be similar to the proposed project.
However, impacts on such elements as transportation/circulation, air
quality, noise and employment would be diminished.
•
Feasibility
This alternative would reduce the amount of leasable building space by an
undetermined amount. There is a high demand for rail-served warehousing
• which may not be tapped if the project were to exclude this use.
�ff
� l
14
Alternative 3 - No Development
Description
This alternative would leave the site in its undeveloped state on a
permanent basis or on a temporary basis until some other proposal for
development is approved by the City. However, pressure to develop would
continue due to Manufacturing Park designation on the Comprehensive Plan,
development of the surrounding properties and increasing demand for
industrial land development.
Impacts
All adverse environmental impacts of the project would be eliminated with
this alternative. The positive economic benefits of the project, such as
increased property taxes, creation of short- and long-term employment and
partial alleviation in demand for industrial land would also not occur.
The most significant impact of this alternative would be preservation of
the riparian forest which would extend the opportunity to the City to ti
purchase the site and preserve it as a green belt. No development would
shift the impacts of development to other sites which may be more or less
suited for these uses.
Feasibility
The "no develoment" alternative would not meet the objectives of the
proponents. The feasibility of the City in acquiring the site for the
purpose of presesrvation is unlikely due to the market value of property
and the City's Comprehensive Plan designation of the site for manu-
facturing park use. However, the City may require preservation of
substantial portions of the site due to the potentially adverse
environmental consequence of development.
IV. Unavoidable Adverse Environmental Impacts
I. The Physical Environment
A. Earth
1. Changes in the contours of the site, including excavation depths of a
maximum of 10 feet for utilities.
2. Addition of fill over native soils.
15
B. Air
1. Increased air pollution' from automobile emissions.
2. Increased particulate levels due to construction activity and
additional traffic volumes.
3. Short-term odors during construction activities.
C. Water
1. Increased surface runoff from the site which may contain an increased
level of urban pollutants.
2. Potential alteration of ground water movement, quantity and quality on
the.. site..
D. Flora
About two thirds of the natural riparian vegetation on the site would be
removed.
E. Fauna
) ` 1. A reduction in the ability of the site to serve as habitat for
wildlife.
2. Reduction in number and diversity of wildlife.
F. Noise
1. Increased noise levels over the short-term due to construction
' activity.
2. Increased noise levels over the long-term due to human activity and
increased traffic and rail volumes.
G. Light and Glare
Light and glare will be emitted from the site to surrounding properties.
16
H. Land Use
1. Loss of open space.
2. Preclusion of alternative land uses for the site during the life of
the project.
I. Natural Resources
1. Consumption of building materials and energy.
2. Conversion of open space to warehousing and commercial uses.
II. The Human Environment
A. Population and Housing
Very slight increase in population to the City.
B. Employment
None.
C. Transportation/Circulation
Traffic impacts will be increased as a result of project development.
D. Public Services and Utilities
Increased demand for all public utilities and public services.
Cumulatively, with other developments in the valley, utilities and
services will eventually need to be increased.
E. Aesthetics
Visual appearance of the site will be altered.
F. Archaeological/Historical
The potential removal of an archaeological site.
G. Economics
Unknown.
17
SECTION TWO
DESCRIPTION OF THE PROPOSAL
•
I. Name of Proposal
i Black River Office Park
II. Project Sponsor
Alterra Corporation
2120-A S.W. 152nd St.
P.O. Box 66101
Seattle, WA 98166
The proponents have requested a rezone of 71.16 acres from General
Classification (G) to Manufacturing Park (MP). The development, to be
completed in two phases, will contain rail-served warehouse and an
office park.
III. Project Location
The proposed project is to be located on a 71.16 acre site, approxi-
mately one mile west of the Renton central business district. The site
is bounded on the north by the Burlington Northern Railroad Right-of-
Way, on the east by the proposed Earlington Woods Planned Unit
Development, on the south by the proposed Earlington Industrial park,
and on the west by Monster Road and the P-1 pumping station.
IV. Other Agencies Maintaining Files on the Proposal
None.
V. Site Description
Roughly 11.5 acres of the 71.16 acre site have been cleared and about
59..5 acres consist of riparian forest. Approximately 5 acres of the
cleared portion of the site is presesntly used for dumping purposes for
a land fill . Access to the fill area is via a dirt road adjacent to
the railroad intersecting Monster Road. The remainder of the site is
heavily vegetated by a riparian forest. The site is generally level
except for those areas near the railroad tracks which have been filled.
18
VI. Description of the Surrounding Area
The immediate vicinity of the project site is characterized by a
combination of rapidly developing industrial lands and undeveloped open
space with several residences to the east. The site is north of and
contiguous with the Earlington Golf Course; this acreage has been
proposed for development as Earlington Industrial Park. North of the
site is the Burlington Northern (B.N.)railroad tracks. Across the tracks
from the site is a heavily wooded slope covering the south side of
Earlington Hill. To the west is the King County Black River Watershed
pump station and Monster Road. To the east and northeast is the proposed
Earlington Woods Planned Unit Development.
VII. Major Physical and Engineering Aspects of the Proposal
Definite site plans have not been determined. However, tentative land
use percentages are as follows:
Site Coverage
Use Acreage Percentage
Warehouse 12.09 17%
Office 35.58 50%
Roads 2.85 4%
Total Developed 50.52 71%
Open Space 20.64 29%
(Approximately 35% of the riparian forest would remain
upon development.)
Also, the proponent intends to impose development restrictions,
including the following:
1. The minimum tract size for any development shall be 2 acres.
2. Maximum land coverage by building shall be 40 percent.
3. Maximum site coverage by impervious surfaces shall be 70 percent.
4. Each developed site shall retain a minimum of 20 percent of the
natural vegetation in a contiguous pattern.
5. An architectural control committee shall approve all structures in
order to ensure that the design is complementary to the existing
environment in the area.
19
6. All development shall maintain a minimum 50 foot setback from the
top of the bank of the Black River Channel .
VIII. Relationship of the Proposal to Existing Laws, Policies, and Plans
The public plans, policies, and laws relevant to the proposed Black
River Industrial Park development include the following:
1. Policy Element of the Comprehensive Plan - 1981
2. 1976 Green River Valley Comprehensive Plan
3. 1965 Renton Urban Area Comprehensive Plan
I
4. Land Use Report - Renton Comprehensive Plan
5. City of Renton Zoning Code
6. Shoreline Management Master Program
7. 1978 King County Sub-Regional Plan, Puget Sound Council of
Governments
8. State Environmental Policy Act of 1971
9. 1965 Renton Arterial Plan
10. City of Renton Utilities Plan
1. Policy Element 1981
The Renton Planning Department has drafted an update of the "Policy
Statement" of the Comprehensive Plan which was adopted in January 1966.
This "Policy Element" is comprised of goals, objectives and policies
which are designed to: 1) serve as a basis for revising the other
elements of the Comprehensive Plan (Land Use, Circulation, and
Community Facilities); 2) interpret and clarify the other elements; and
3) address those areas that are not included in the other elements.
This document was adopted in February 1981 by the Renton City Council .
A detailed discussion of the relationship of the proposal to it has
been included as follows:
j-.
1
1.A. BALANCED DEVELOPMENT OBJECTIVE: In order to maintain an acceptable
quality of life, land use decisions should be based upon a balance of
public services, economic feasibility and environmental considerations.
20
POLICIES:
1. Adequate transportation capacity and utilities necessary to service
new development should be available or provided in conjunction with
actual development.
2. Urban development should be permitted when it is compatible with the
natural and human environment.
3. Urban development should compensate for the services that it
requires.
Comment:
Although basic public utility facilities are available to serve the projected
development, the proposal would require the construction of road access from
the site to Monster Road, which would be completed in conjunction with project
development.
Implementation of the proposed action would result in the elimination of 78%
of the natural riparian forest currently existing on the site, significantly
affecting the natural environment. In this respect, the proposal is
inconsistent with this policy.
As a general rule, new industrial and commercial facilities typically generate
sufficient local tax revenues to offset the additional services required.
However, for this specific development, that has yet to be substantiated.
1.B. POLLUTION OBJECTIVE: Pollution should be minimized.
Comment:
Project development would result in increased traffic volumes which would have
a commensurate increased impact on air quality characteristics in the
immediate vicinity of the site.
1.C. OPEN SPACE OBJECTIVE: Open space should be obtained and retained in
selected areas.
21
POLICIES:
1. Existing open space that serves a public purpose should be retained
and made available for a variety of open space uses.
2. Natural vegetation, ravines, slopes, and waterbodies should be
preserved to retain open space.
3. Open space should be located throughout the City and incorporated as
an integral part of all development.
4. Open space elements should be combined to form a visual and physical
separation between major sectors of the City.
5. Areas of strips of open space should be retained and enhanced to serve
as buffers.
6. Open space areas should not be considered as a reserve for non-open
space uses. If an overriding public purpose requires the use of open
space land, a comparable replacement site should be provided.
7. Multiple uses of open space land should be encouraged, provided that
the uses are compatible and' adequate area is provided for each
function.
8. Open space which is used to preserve views should be retained.
Comment:
The site is heavily vegetated, contains wetlands, and affords visual relief
from the intensive urban developments existing and proposed for the area.
This open space would be significantly reduced as a result of project
implementation and thus, the project would not be consistent with the intent
of this policy to retain open space.
1.D. WILDLIFE HABITAT OBJECTIVEE: Wildlife habitats should be designated,
preserved and enhanced.
Comment:
The deciduous wetland forest on the site offers a rich and varied wildlife
habitat for numerous mammals and birdlife. Project implementation would
significantly reduce the wildlife habitat on the site and thus, is not
consistent with this objective.
22
1.E. VEGETATION OBJECTIVE: To preserve scenic beauty, prevent erosion, protect
against floods and landslides, minimize air pollution, and reduce storm LI
drainage system costs. -'
' POLICIES:
1. Desirable natural vegetation should be retained wherever possible.
2. In unique and/or fragile areas, desirable natural vegetation should be I `
retained or enhanced.
3. Healthy trees should be retained where possible.
Comment:
Implementataion of the project would result in the removal of 78% of the 59.5
acre riparian forest which is considered unique for this area. In addition,
the proposal would displace approximately one-half of the flood storage area
presently found on the site. The subject propsal is, therefore, not
consistent with the intent of this objective.
1.F. RESOURCES OBJECTIVE: Natural resources and areas having scientific or
educational value should be identified and preserved.
Comment:
It is likely that archaeological and cultural resources may be present on the
site given its proximity to the old Black River Channel and other nearby
historic discoveries. Prior to grading operations on the site, a coring
program will be conducted to discern the location of such resources and those
areas may be preserved from development until completion of excavation.
1.G. SURFACE DRAINAGE OBJECTIVE: To remove harmful materials and sediments,
replenish ground water resources, and minimize erosion and floods.
Surface drainage should be controlled.
POLICIES:
1. Stormwaters should be retained on-site and then released at a natural
rate and quality. The City's storm drainage system should be designed
to incorporate natural drainage features.
2. Precipitation should be returned to the soil at natural rates near
where it falls.
23
3. Development should be designed to facilitate percolation and to
minimize impermeable surfaces.
4. Development should include appropriate design and/or equipment to
ensure clean runoff.
Comment:
Consistent with City policy for drainage control in the vicinity of the
proposed P-1 Channel and detention pond, no on-site stormwater detention is
planned. Rather, runoff will be directed immediately to the Black River
Channel where it will receive wetland treatment prior to discharge into
Springbrook Creek.
1.H. WATERBODIES OBJECTIVE: To minimize flood damage, minimize the need for
storm drainage facilities, promote recreational opportunities, protect
wildlife habitats, and enhance adjacent uses natural waterbodies should
be presesrved.
POLICIES:
1. Public access to publicly-owned areas along waterbodies should be
provided.
2. Development should be designed to allow the most compatible and
aesthetic use to be placed near the waterbodies.
3. Development should be designed and constructed to incorporate features
of waterbodies.
4. Development should be oriented towards waterbodies.
5. Selected marshes, bogs and swamps should be preserved and enhanced.
Comment:
A major portion of the riparian forest is a wetland for most of the year and
serves as a flood storage area. Because project development would result in
the elimination of this wetland, it is not considered consistent with this
objective.
1.I. FLOOD PLAINS OBJECTIVE: To protect life and property and provide open
space flood plains should be preserved and enhanced.
24
Comment:
Implementation of the subject proposal would cause the present flood storage
area of the site to be reduced by one-half and thus, does not promote the
realization of this objective.
1.J. MARSHES, BOGS, AND SWAMPS OBJECTIVE: Selected marshes, bogs, and swamps
should be preserved and enhanced for water retention, wildlife habitat,
and open space.
Comment:
The site presently is a wetland during the year, except during the summer
months and serves a viable wildlife habitat for numerous mammals and birdlife.
The wetland area would be significantly reduced upon project development, and
thus, the subject proposal is not consistent with this objective.
2. ECONOMIC GOAL: To promote a sound, diversified economic base.
2.A. FISCAL BALANCE OBJECTIVES: Activities that provide a favorable fiscal
balance between municipal costs and revenue should be encouraged.
POLICIES:
1. Activities must minimize pollution, thereby protecting the public
interest, welfare, health and safety, and the City's image.
2. Activities should not overextend public facilities or services.
3. Activities with a favorable ratio of cost of public services to
potential revenues should be encouraged.
Comment:
Please refer to the comment on 1.A. Balanced Development Objective on p. 19 .
2.B. EMPLOYMENT OBJECTIVE: Activities that provide for a stable work force
should be encouraged.
POLICIES:
1. Diversification of industry should be encouraged.
25
2. A wide range of employment opportunities should be provided.
3. Balanced industrial and commercial growth should be encouraged.
Comment:
The proposed action involves construction of a mix of uses including
rail-served warehousing and an office park. Approximately 4,000 employment
opportunities would be generated in the long-term upon occupancy which would
contribute to the stability of the work force.
3. URBAN DESIGN GOAL: To promote aesthetic and functional harmony and to
provide a proper balance of residential , commercial and industrial areas.
3.A. LAND DEVELOPMENT OBJECTIVE: Growth and development should occur in a
timely and logical progression of the existing urban area to maximize the
use of existing services.
POLICIES:
1. To minimize the necessity for redevelopment, premature development
should only be allowed where it can be shown to be compatible with
future uses in the vicinity.
2.. Development beyond the urban fringe should only be allowed where it is
a consistent extension of urban services.
3. Vacant land surrounded by developed land should be given priority for
development.
4. Land where adequate public utilities are available should be given
priority for development.
5.. A balance of residential , commercial , and industrial areas should be
achieved.
Comment:
The proposed action would occur in an urban area served by adequate public
utilities and characterized by existing and proposed development. In these
respects, it would be consistent with the above objective.
3.B. DISTRICTS OBJECTIVE: Districts should be identified and the integrity
preserved.
26
POLICIES: 0
1. Districts should have efficient and functional relationship between
various land uses.
2. NA
3. Boundaries of districts should be buffered by uses compatible with
each district.
4. Transitional areas should be converted from one use to another as soon
as possible, with new uses designed to be compatible with existing
uses of the district.
5. Districts should project a favorable image.
6. Each district should be encouraged to have its own identity.
7. A landscape theme for each district should be encouraged.
8.. Development should be harmonious both in intensity and architectural
design within a district.
Comment:
The proposed action would be an extension of the manufacturing park concept
that is typified by the existing Earlington Industrial Park and the proposed
Earlington park to replace the existing golf course located to the south of
the project site.
The low-rise architectural nature characterizing these uses would be continued
on the site.
3.C. LANDSCAPE OBJECTIVE: Landscaping should be used for buffering, screening
less attractive activities, and minimizing detrimental impact between
uses.
POLICIES:
1. Landscaping which enhances the primary design should be placed around
all structures, in the interior of parking lots, and along the
periphery of the site. (_
2. Refuse and/or other unsightly areas should be screened and landscaped.
r
3. Landscaping which is suitable for screening and buffering should be
provided between use areas.
4. Transportation corridors and facilities should be landscaped.
27
5. To provide continuity adjacent owners should be encouraged to
landscape and maintain planting strips and portions of unimproved
public rights-of-way.
6. Areas with a common theme or design should be encouraged to adopt a
landscape theme.
7. All developed property should be appropriately landscaped.
Comment:
Retention of portions of the existing vegetation on the site, as well as
preparation and implementation of a landscape plan will provide buffers from
the Earlington Woods PUD to the east of the project site, which may be
'_. considered incompatible with the proposed office and warehouse uses.
Effort will be made to be consistent with the landscaping design to be
implemented on the proposed Earlington Park development to the south of the
site. '
6. INDUSTRIAL GOAL: TO PROMOTE THE DEVELOPMENT, MAINTENANCE OR
REHABILITATION OF INDUSTRIAL FACILITIES.
6.A. AREAS OBJECTIVE: Viable industrial areas should be created and/or
maintained and declining facilities revitalized.
POLICIES: '
1. Industrial areas should be compatible with adjacent land uses.
2. Buffers should be placed between industrial districts and other land
uses.
3. Industrial areas should be located and designed so that access is
convenient to major transportation corridors.
4. To minimize travel and congestion and to promote safety, industrial
areas should be located and designed accordingly.
5. Except for supportive and convenience uses, non-industrial uses should
be prohibited.
6. Compatible design and landscape themes should be encouraged.
28
Comment:
The proposed action would be an extension of the warehousing and office uses
proposed for the Earlington Park, south of the site and the Earlington
Industrial Park to the southeast. A buffer of existing vegetation would
separate the proposed action from the proposed residential uses to the east of
the site and an effort will be made to choose plant materials for the
landscaping plan with similar species to be utilized in the Earlington Park
development. Also, the low-rise nature of Earlington Industrial Park and the
Earlington Park will be continued in the structures to be built in the Black
River Office Park.
The subject site is located with nearby access to I-405 and local arterials,
once the access to Monster Road is completed.
6.B. STRUCTURES AND SITES OBJECTIVE: Industrial structures and sites should be
well-designed, constructed, and maintained.
POLICIES:
1. Structures which minimize energy consumption should be encouraged.
2. Adequate setbacks and enhancement of the views from adjacent
residential property should be considered.
3. The preservation and enhancement of the views from adjacent
residential property should be considered.
Comment:
At this stage of the development plans, specific building designs have not
been formulated, however, energy efficiency will be considered during the
decision-making process.
Retention of existing vegetation and the installation of landscaping materials
will preserve the wooded nature of views from the proposed residential uses to
be constructed to the east of the site. However, the impacted views from the
residences in Empire Estates located upslope to the north of the project,
would not be measurably mitigated by the installation of landscaping.
29
- 8.B. WATER OBJECTIVE: An adequate water supply and distribution system should
be assured.
8.C. STORM DRAINAGE OBJECTIVE : An adequate storm drainage system which
minimizes the impacts on the natural drainage features should be assured.
8.D. SANITARY SEWERS OBJECTIVE: An adequate sanitary sewer system should be
provided.
8.E. REFUSE OBJECTIVE: An adequate refuse collection and disposal system
should be assured.
8.F. ENERGY OBJECTIVE : An adequate energy supply and distribution system
should be assured.
8.G. COMMUNICATIONS OBJECTIVE: Adequate communications systems should be
assured.
Comment:
The extent of the proposal 's impact on the public utilities listed above is
discussed in detail under each appropriate section in this document. Where
applicable and feasible, suggested mitigations are included.
9.E. HERITAGE OBJECTIVE: The City's cultural and historical heritage should be
preserved.
POLICIES:
Archaeological and historical sites and buildings should be recognized
and preserved where practicable.
Comment:
It is likely that archaeological and cultural resources may be present on the
site given its proximity to the old Black River Channel and other nearby
historic discoveries. Prior to grading operations on the site, a coring
program will be conducted to discern the location of such resources and those
areas may be preserved from development until completion of excavation.
30
2. 1976 Green River Valley Comprehensive Plan
The Green River Valley Comprehensive Plan was adopted in 1976. Goals of I )
the Plan are as follows:
r_I
a. "Promote high quality development that will enhance the image of the
City of Renton."
Comment:
rm
The proposed action is intended to be in conformance with this goal
through enforcement of the development restrictions listed on p. 18 of
this document. In addition, this goal will be met through the mechanisms
of platting, environmental analysis and review, and review for permit
approval , as well as through the conditioning of the project during
approvals.
b. "Preserve and/or enhance wildlife habitat."
Comment:
This goal will be impacted by the development of the proposed Black River
Office Park in that there will be loss_ of about 78% of the natural
vegetation and open areas that serve wildlife on the site.
c. "Enhance the tax base of the City of Renton so all the citizens of
Renton are able to benefit."
Comment:
This goal will be supported by the proposal . The existing open space use
has a very limited economic return but virtually no cost to taxing
jurisdictions. The secondary impacts of employment taxes and a
broadening of the employment base in Renton will occur, along with
significant increases in the cost of municipal services.
d. "Minimize noise, air and water pollutants, transportation
difficulties, glare, heat, vibration, and other detrimental effects."
i
31
Comment:
The extent to which the development could impact the environmental
impacts listed above is discussed in detail under each appropriate
section in this document.
e. "Promote aesthetics, including views, from adjacent hillsides."
Comment:
Views would be modified from natural open space to warehouse and office
development. However, minor areas of natural vegetation would be
retained and landscaping will be introduced.
f. "Provide a high quality working environment for employees."
Comment:
The office park area with open space, visual access to the riparian
forest and the landscaped areas will provide a positive working
environment..
g. "Provide a viable economic climate for industrial firms."
Comment:
The subject property is one of the last remaining large parcels of rail
served industrial land which is located in the number one drayage zone in
the Greater Seattle area and also has, in effect, reciprocal switching
with both the Union Pacific and Burlington-Northern railroads.
These factors, coupled with the parcel 's close proximity to two airports
and a highly developed transportation network assures that the proposed
action would provide an economically viable climate for those industrial
firms that locate there.
h. "Promote a diversified economic base."
32
Comment:
The conceptual site plans indicate a mix of land uses to occupy the park.
They will include heavy warehouse and office uses fashioned as office
park.
i
i . "Development should be designed to minimize detrimental impacts."
Comment:
As indicated above, the proponent is planning to institute several
development restrictions, such as retention of at least 20% of the
natural vegetation on each building lot and a minimum of 50 foot setback
from the bank of the Black River Channel . Implementation of these
measures will minimize the detrimental impacts of development.
1. The Land Use Objectives of the Green River Valley Comprehensive Plan are
as follows:
a. "Light industrial office and warehouse uses and those heavy industrial
uses that can be made compatible with the goals of the Valley are the
types of developmental land uses intended for the Valley.
b. Incompatible uses in industrial should be discouraged.
c. Certain areas should be retained in their natural state to meet U.S.
Soil Conservation Service requirements and community needs for
mitigation of wildlife habitat and open space.
d. Land uses should be grouped to promote a harmonious mix.
e. Those greenbelt areas that are suitable for development should remain
as wildlife habitat until they are ready for development."
Comment:
The proposal is substantially consistent with objectives a, b, d, and e
listed above. Retention of certain areas in their natural state
(Objective c) is possible under various alternatives proposed and
mitigating measures drafted for the proposal .
33
2. "Circulation Objectives
a. Access should be limited to controlled ingress and egress points to
avoid conflicts and congestion.
b. Circulation should be designed to minimize the area devoted to rights-
of-way.
c. At-grade railroad service should cross as few streets and trails as
possible to minimize safety problems and inconvenience to other modes
of transportation.
d. Streets should be adequately designed to safely accommodate the types
of vehicles that will be used.
i
e. All parking, servicing and loading and unloading of vehicles should be
only on-site.
f. The possibility of providing mass transit should be considered."
Comment:
The proposal is substantially consistent with objectives a, b, d, and e
listed above; however, because site plans are not definite, the precise
overall traffic consequences are not known. Objective c does not apply
as no access roads nor circulation roads internal to the site will
intersect the railroad spur on the site.
3. "Landscaping and Open Space
a. A. landscape theme and recommended plant list should be established to
provide habitat for wildlife and to promote aesthetics.
Large
b L ge areas should be permanently reserved and managed for wildlife
habitat.
c. A landscaped buffer should be established at the periphery of bounding
streets to create a favorable image; between areas of incompatible
land use to minimize differences; and along water channels and
34
wildlife habitats to minimize impact on wildlife and promote
recreation. !�
d. Whenever feasible unique natural features should be incorporated into
developmental plans to preserve the character of the Valley." __I
Comment:
The preliminary site plan indicates that landscape buffers will be
maintained to separate the proposed development from both the proposed
industrial park directly to the south and the Earlington Woods PUD to the
east. These objectives will further be met by instituting items 4 and 6
of the development restrictions listed on p. 18 of this document.
4. "Design and Development
a. Design standards should be established to insure high quality
development.
b. Development should occur in a logical , systematic manner to prevent
the premature expansion of utilities and minimize the possibilities of
vacant parcels occurring."
Comment:
As discussed on p. 18 of this document, the proponent has established a
set of development restrictions to govern the subsequent development of
the site. The following stipulation will contribute to the compliance
with these objectives.
"An architectural control committee established by the developer shall
approve all structures in order to ensure that the design is
complementary to the existing environment in the area."
5. "Site Objectives:
a. Circulation -
1. Internal circulation should accommodate all modes of
transportation but these should be kept separated as much as
possible.
35
2. Ingress and egress points should be well defined to expedite the
safe movement of vehicles and people.
Parking -
3. Adequate screened and landscaped parking should be provided for
employees and visitors.
•
4. Large interior landscaping islands or a series of smaller parking
lots should be used to break up the large areas of paving.
5. Where feasible pervious paving materials should be employed to
minimize surface water runoff.
b. Landscaping and. Open Space -
1._ A maximum amount of appropriate landscaping should be permanently
' , ' established to provide wildlife habitat.
2. Large amounts of landscaping scattered throughout the site
including along property lines are encouraged to provide a
pleasant environment, minimize the impact of the development and
enhance the visual experience from the adjacent properties,
including hillsides.
3. Areas set aside for future expansion should remain in the
original state or rehabilitated to support wildlife until the
expansion is needed.
L 4.. Whenever feasible unique natural features should be incorporated
into developmental plans to preserve the character of the Valley.
c. Design and Development
1.. The site layout and architectural treatment should be compatible
with the characteristics of the site and the design standards of
the Valley.
36
2. Less aesthetic uses, such as loading areas and outdoor storage
areas, should be adequately screened and laidscaped and placed so
they are not visible from adjacent public rights-of-way.
3. Roofs and other features of the site that are visible from !
adjacent hillsides should be designed to minimize visual impact.
4. All utilities should be placed underground.
5. Firms with large numbers of employees should develop outdoor
recreation facilities.
6. The latest technology should be employed to minimize adverse I.
characteristics."
Comment:
Circulation and Parking:
Both circulation and parking objectives are being considered and complied !^'i
with in site planning. Regarding the final objective, no pervious paving
materials have been considered to date due to the early stage of site
development.
1
Landscaping and Open Space:
The precise type of development, as well as the final landscaping plan,
are undetermined at this time. However, the proposed development may be
1i
consistent with the above objectives if items 4 and 6 of the development
restrictions listed on page 18 of this document are implemented.
Design and Development: i
Objectives 1 and 2 have been considered and employed in the design of the
site plan. Roofing design will be addressed by the architectural control
committee at the time of development. All utilities will be installed
underground. It is possible that the site plan could contain provision
for a connection to the jogging/bike trail that will be incorporated into
the Earlington Industrial Park to the south. Lastly, it is premature at
this time to speculate on the type of technology to be used at the time
37
of construction; these decisions will be made by individual builders at
the time the parcels are subdivided.
3. Renton Urban Area Comprehensive Plan - Renton Planning Commission
The City of Renton adopted a Comprehensive Plan in 1965 which was revised
by the 1976 Green River Valley Plan. The map of Proposed Land Use
included with the policies showed the majority of the subject property
suited for industrial park uses. A small portion of the west corner of
the site is classified as Green Belt (GB). (See Figure 4 on the
following page) .
Comment:
A portion of the area designated as "green belt" would be removed in
order to provide access to the site from Monster Road. However, other
natural areas on the site would be preserved.
The following Goals, Objectives, and Policies of the Renton Comprehensive
Plan are those pertaining to this area.
"Industrial Development
The purpose of indicating industrial areas is not to dictate how industry
should develop, but rather to recommend the best location for industrial
use based on available information and advanced planning principles.
Industry cannot be adapted to just any site or locale. Unless well
planned for, certain detrimental influences such as excessively heavy
traffic, high sound levels, smoke, glare, ground vibration, etc. may
produce blight in the surrounding areas. Certain basic factors and site
conditions are desirable for industrial development. They are:
1. Level land with good drainage.
2. Larger parcels and tracts not broken up by small ownerships or uses.•
3. Direct access to transportation (railroads, highways, airports, and
waterways) .
4. Availabilityof electrical power, water and natural gas systems, and
sewage facilities.
38
1 - v--km-----�--- `".,,,..•. zz....=�,,,,,..•. 4..,:;i..,,, r::R:,,,.:• -,K, c'' 'r:t' „„ }i;,r',: s..,Lk_.._.._..._.,...i....=......s.<......_.,
`--�a•a :-;e:.: .'^-'^^:;:.,.:•.1,.` i!, '�'"k,>r,''%r,:;'3::� -:•r'13�Vim,, c-i:`.,_.. ,�;':�•':�`.i .� :�:.,;. •—'V�.�-�•, r;-;.c�,'ti c.,,;»a
•
}% '- :: `:l:_ �':•"' `i`'-:;•• • ;! `6ws ''r,:'.%; =^cam.,, , .,, `� •,. p
;,,� ,,.r;. .�=«.•^'.t;: .`.it:. `. .4fi ..,Y:d d': ice.=`„, Y'r ..,.,.a I. i "x.;',;:,'�• •.�•. �^ayxm,an"}p;x. 0 .psr-a. �.$'. '.'�'s,:;°.Z: o%�i.' .. ,,).Y, '1 ! ! s,�, �
•,-7,,w. .4.'�• w�•L ;'t s .-c..,::• ,* ��}},,� ,Jf,v-.a. ,,t` . J.},,F.:. ;, }{, .,-`r>ti 1 f ,]i�z,'rao n"'''.,F,'."3�.t H%, .,-#..«. .>��':••'�•�u ;c@•.:'�",�'r,•^„L,.,.r Y�f. _;\'+f�i'i�'>1�;�:•;.5. i'{�t e� :t�,s,�✓ � '
it••:�,,,'.'�•.- ,. �,,-4,`?' +.` :.-„,,,2>i .y. (!: �•: ,^',; ,: .:r"`Y,.:' .Y:k:-`:;'c'_ `'�Di;' ''•;. i`;,, , t�. `:1;^P:':;,.
' 1 �' •,4c=r•..:.;s,,,,.< ,: �& r:::c:;. ":4'4. F: �••'4 3�•'7 � �. ,�;:i`•i";.y'",1 ,y
/F if":"�`]. • .�.=-w=�,a`t�i.IY*';,"'.;*w,;aCx. :°�,`ro-z'°•'`.•-i';••.;. c ..;.,; ".T;.:;-::;:�%::;5� 'ri:�:-.�°r' r;b„,-%:•:;'4 :.;.�- F�;,�< TO.' •�~^' :.�: r_�,:e:.�
77.1 •i•• D `;• 4.;,,._,-,z,,r,,, �:ti„- :41,,L...-,%.•:^' .Fr>.%X.;, :.% < r•r",' • .:" •'t .+' ,,, �, 1 =x•i.' "v , i (.
�i,:,C •..^�. 'S . :;" ;3 �r':;.,,,,y 4.)S.'..r yN°C:, s�.t,•• i�19'� j.
i ,. • i .�i✓. ..,.ti._ •„ =�v--.-+-•-. w. �;dt,:%::•;h.:_ -`�'�t.;�� =:;5 `,r ▪ '�:.C�.�,,i �-:� a., •:y�,'�'`.' 4 ,� �p ...,.d a'""'d#1- �� oc�ly.�.!
•" +4..r'.• •,"J r tr' •Sr•i r.V•+.' •. n•i :`v-,,,,,f';._"•-i,,,ei .,,,,,,,,,S,.. :.:,,'%:'',;:214},t::;i,< ,..!'•••, ',.: �': J _•�i,t�'it l`•,• .!ii ':• ••T':"•�.•"':"..' ,.,�•"ri»+,,,,.1...1.:\':_ t,': %,, f •:+,'e.P,4::'.;',i.;:':'{�� '•'✓ ;'1;� :.✓•_ ® rE°'i�l P .� f,y.,. �„�°�� •:is'
-f-"-';' ..' ,r'. =�-.- ...-..-• .•.-..s ..: ,�-fir:;: +Ls:#•.:�""'j' :<%•;els_�r.,., ,;"t'c<•t i;:;.� i.;,=-'�.; ,.�?^ §, a s..) zu,�f, ro' FJt'
•••i•_.,,• y:,i r''' ''s.ff,•••:.,:-te" ti' >,� ^'-.t.� ,
•. v:.%' „_„✓': •'tii .w;,b:�;;:•:t•.::', �¢X�'� ��ij,'•��, �:�',r�"-;.:.':�3'.�::'s`i,.c -•'r""' 9 S3 R'w'� rvt.
.'�. + .` .yr l,.J •
•- - �:ti.':v ▪�', r. �c,a , a. .-.'•: F t':,.. 1,� n r;t ...,r• `• j4: '.
• .'.',•"' :- ✓.,1,�•'�•- 'i'5' ' �- -, •;'ems:';:%:•°'..:.
v r.`�°••"•
-..i. ,.:J •--•--��.--'. ,r, .�.: �'•` � ?" 5..'�t�=�;'.�Tit,�:v S.
- -, `a C:..='�s�_�.•,.;;:i s �As-
�,• ..
,`:,:.i,..,w e 1 `,". �•,, _•'t' ro-. +t ...fit{;= r,, 't;'. • •'-t:•} " w;:.,..
.YC�Y•.r.Y :,. :y,I�•J 1YY•j•i' G='� :? +,.i:?%�yi:�::::'>:i^?y • ; -.f• .. • ,.. I
• • ,.• :°',..:>: .�:.:�..,
Lti.�.'�.Ghq k'�' ►i•,'f4r.J� . ' '11:+ o; •�,� ti.�^. „'y'...__�',. ..vv, .; :t::
� 1I,' M.•t.`tl � f h, \f '•-i�i:`•�)�-:;.'?.i'•}�':d�iaiiif°jw .s r
�{• ' •j { IIIIIIIi11111R
✓W- •�'C:1..�•..6r•t•5�•• Fr+^ti'.fi \ .".ti"..'•j.Sv"' f.,'''�. _.
";�`�" K. .• iiiiiiiliiiiiiiilP,.,t,-, .;<.,_:.
�.;.• .=tea;,.• l.r• �r���■ ..�L/7 9,':-:. ,:�",c�_y,°.',ue•,'•.::a •:'',:�;.r:',f,S
• YJ;r
�. 111111 ,, iIpr • zi
%;,.:;;;;* - $:::::::::::::::::::::::;::::::::K"V•A'4Yr,L ;' . I ,.,t .' -
i''';`' \-, 4*:::::::::::::::::::::::•:::::::::::;1?4,i'',4 .,..,-..:-..7.- '''''-‘' l',.-9 !II I t`;‘,4 L——'' 1
3 •• •%•:•••; •••• 1• 4 in " )` fir! t
:s�••:�:":••+'•'•Y'"lf .,ems `,•�" "9r' f,'' aqq 2 r a7'.',`-,.�..�,_>_ �,,::.«'�
(--
Vi
ti •� ::. • ;.ty,;" _ ` :,,.,M�s:', ,<>�_ -fir"• . .,..... Is:.< :r,x=•�......_......n�'S{' +=easSn"'.i', r5# g;{ Lrq a'Yx°Y+ '-� �}' \ {r ye , s .41 /
-,-, =— _ -- - -——- ', E f°1 g °i�. 4y. . �•a m..;
\ d'',- 4 _ - -, `1;, �i.i�v .',I +gyp 1 s a sp za /,r -
A =? \ {:�. .. ..i,:- s.'i' I '�I I_,,,ry_-:`,�•^,;tS S» tN# 1 `-" Ad
p� a \,-+.'au-
< } % �y+'•✓'"�-� 7 �v5•�7� �1/1`/3f-•.\s (R `•! , \\\,t o �sy 00-0-_,tii
Ae...1:.r:L'.. 7:tilfrAff :4 ,/ L 1. 111St':,:g*: '4 ' 4 :trAr. r:,// ,g
... 4..
1 ti ;;�� ,1�rv4 ' ''f,,---__,1_______ 47:t1:.,,Vs,L /N.'i. .r4., .. A . eta �) ...,_.J.1 I .) :,/,=w
1 .k a 1g _ .w ;\f ••'f»1,,, v, i \c is �r, " ifi fII( —
•{ii.:„ �i�t'.1'^J-Y1 ?,%yl {\-ice v4:i� '! '' t � f
' ( 1, (� . �.. rit_\/ \ 1'i- .- '` ,) Jew' . ®t y'-•a,
�_G1i ri ��}�/{iL ♦ )1 �} ?b la it
I `•�--_ a)' -Ai Lf 9!3 \Sk l.\-lat lj�;•* i{ .,4-;4,..,„ .._ %e$'3• .,';141;4' 'PL1 hs:I ZE`Ya?��5 dtiT Z",'•rit�.1_._—�.�s +'n j/� .�.Q''.t—e.-
g 1) .'�' 'gym- -'5 S: '*' 41„:..1:1!1141/`t��, r..:t 4t,a4.1: viae.,'�t..,.e__x. .74.2.tU+':rao ?^-.. :,,r",'';ik} lI 1l'-" �tI?t,({� f '-
Vil'
� �' t� ? �LP_ r3..�_/ • F u ( yak
Ei �� -�J.3s 1(fbf'...'.1."`X ('- S �, ? . a ei,ya //
HIGH DENSITY RESIDENTIAL 6� GREENBELT —
u\ 1 ,
COMMERCIAL :'-:.�•:1 PUBLIC,QUASI—PUBLIC i
ue:• si•:�•w•
MANUFACTURING PARK
.I' .;I 1 \_i_RECREATION
t--
1
0 1000 2000 4 COMPREHENSIVE PLAN
•
BLACK RIVER..
U.S.G.S. BASE OFFICE PARK_.
NORTH R. W. THORPE & ASSOCIATES
39
5. An immediate or potential labor supply.
6. Proximity to markets.
7. Proximity to raw materials or supply sources.
i In any suburban area it is well to encourage Industrial Park type
operations as new industries are built. It is desirable that any use
would be allowed in such a park when it conformed to the following:
First, it does not generate or cause smoke, dust, glare, smog, or
excessive odors. Second, it does not result in water pollution beyond
the limits of the plant.
Industrial parks should be designed to protect surrounding uses and
properties by providing screening and adequate setbacks.
The reservation of space in the industrial park is an aid to industry in
providing adequate room for its efficient operation, potential or planned
expansion, employee parking, and landscaping and other site improvements.
While some light industries may be located near residential neighbor-
{ ' hoods, others should be located only within special light industrial
areas with more open space, or adjacent to heavy industrial districts.
Heavy industry should be located where adequate utilities, communication,
and transportation are available, where reasonable distances to living
areas will minimize commuting time, but where the community will be
protected from the greater noise, smoke, odors, and activities of such
installations.
With the construction of many miles of new highways and freeways within
and adjacent to the City, it is the City's objective to aid in creating
and maintaining the appearance of clean, attractively landscaped,
functional circulation systems.
The City further intends to encourage and allow the development of new
commercial and industrial park developments adjacent to these freeways
and highways in appropriate locations. The standards governing location
40
and development shall be based on those adopted by other municipalities
employed in the development of successful industrial and commercial parks
in many parts of the U.S. and Canada. The beneficial results which can
be achieved may be observed in the nearby Andover and Overlake Park
developments located in Tukwila and Bellevue."
Comment:
The proposed site meets each of the aforementioned site conditions. The
proposed action will be consistent with the factors and site conditions
desirable for industrial development outlined in the Renton Comprehensive
Plan as follows:
1. The site of the proposed action is characterized by level topography
with poor drainage in some areas. To bring some building sites up
above 100-year flood levels, fill material may be introduced.
2. The proposed 71.16 acre development will be available for purchase in
small parcels to be developed in tracts of variable size with a
minimum of 2 acres.
3. The heavy warehousing use on the site will have direct railroad
transportation available to it, and all uses will have convenient
access to I-405 and other regional highways. In addition, both the
Renton Municipal and Sea-Tac Airports can easily be reached from the
proposed site.
4. As indicated in the respective sections throughout this document,
electrical power, water and natural gas systems and sewerage
facilities are available to serve the proposed development.
5. The project will employ skilled and semi-skilled workers. Some of
these can be expected to be filled by the unemployed Renton work
force, however, the majority will be transferred from tenants' and
users' alternate sites.
41
6. The site's proximity to Seattle and other Puget Sound metropolitan
areas, satisfies this site condition.
7. The site's ready access to railroad, highway and air transportation
j contributes to its close proximity to raw materials and supply sources.
Although an increase in particulate and dust generation, together with
temporary odors (roofing and asphalt paving) will occur during the
construction period, these will diminish upon occupancy. It is not
expected that smog, smoke and glare would be generated from the uses
proposed for the project site. However, a small amount of dust and
suspended particulates will be generated during occupancy with the
additional vehicular traffic generated by the project. Secondly,
implementation of the mitigating measures listed on pp. 511 would assure
that water pollution initiated on the site would not extend into the
Green River beyond the boundaries of the site.
The proposed development will be separated from the residential uses to
the north by the wooded hillside. The residential/commercial uses being
constructed in the Earlingtron Woods P.U.D. to the east of the site will
be bordered by a green belt. The Metro Waste Treatment Facility located
to the southwest of the site is adequately separated from the project
site by distance, fences and berms. The southern border of the site is
adjacent to the Earlington Golf Course, which is proposed to be developed
into an industrial park.
4. Land Use Report - Renton Comprehensive Plan
L The 1965 Land Use Report, a major element of the Comprehensive Plan,
supports industrial development at the subject property.
"Adequate provision for future industrial expansion has been indicated in
the Earlington flat and Green River Valley areas. Of great importance in
the plan concept is the incorporation of industrial park belts adjacent
to the freeways and major highways in these developing and future
industrial districts."
42
The Land Use Report defines a number of community goals and objectives of
which the following pertain to the proposed development:
1. "Provide opportunities for employment of the City's residents within ,^`r
convenient walking or commuting distance." �__�
2. "Protect property values within the community for the benefit of its
residents and property owners, through the effective control of land
use and the enforcement and application of building and construction
codes."
3. "Encourage the development and utilization of land to its highest and
best use in such a way as to promote the best interest of the
community and contribute to its overall attractiveness and desir-
ability as a place in which to work, shop, live, and play.
•
Comment:
The proposed action substantially conforms to each of the above goals and it
objectives pertaining to the proposed development. The project will
provide opportunities of employment accessible to residents of the City.
The surrounding property values will be increased by the proposed action.
5. City of Renton Zoning Code (See Figure 5 on following page)
The proposal is in an area currently zoned General Classification
District (G)--those areas annexed to the City for which no zoning i !
+�1
classification has been fixed or determined by Ordinance. Single family
homes on 35,000 square feet are permitted in the "G" zone.
1 '
1
Comment:
Prior to project development, the entire site will be required to be 1�
rezoned to Manufacturing Park, which permits essentially the same uses
sanctioned in the L-1, Light Industrial District. However, this zoning —,
designation imposes standards of intensity with respect to use and level
of external effects of the development on traffic congestion, noise
levels, glare and heat, water and air pollution and fire and safety
hazards. To this end, standards regarding buffers, setbacks, screening
and bulk limitations have been established and will be complied with in
the development of the Black River Office Park.
4LA
-- —c, ?- 1 ,_.,".--*--70 .--1 irk!........ "----31.,
L —. l.`! r.r_ 1 T-f�� _L .1 '•F et •,t�-- / . .- —73.ry— 1
1.
j
- ., T _ ��, . _i___,..__LL___,,,1, , 5, ..,,,..., , ,, ,... . , .1/Ili-71_,1, . .•7:17:1
.� -\ •••
i.
r ----: •L':<,)
..A_II ,ffit ; I I e -
_' S 1377. - . -T - 1 41141
•- '� './.
. 4 5 t ' ' 1-7 - i 41;0' Ng NI of-I. .
. Iii; .• ft ffil.11 al# Ar.ii:„.
I . kiktgi Viiii
L .- Ct.,_ 7'7-- , 1 %Ss
filil RP
'...:....".
`t, U1SET BLVD
` SITE — — ''```*QSZ- css��►et0
. ,t a: at?4 72
ci
i to G !oft `4:4cE,
ijiliS
2f' , L } .
-.ate 24
A Y 0•- �•.
- �I •i -�---- i M-P .. __4
N . G 1 \\ . u
I / M E T R1
DISPOSAL.7y1 -
I SNEQN
NOR A F. :'a Illllllllu!f
v.
�� woo i�NIi- i,:.:��pi11
'lllw ►i
.\ t%\ il
4000.....• ��• Ir il':1,301111 dib�•-I 11 Ni• iIN�*'
\ ,I �� ,�� ;,i liiil i�I�j,lr0 �plllllllllI�olull=nY
• 0: 4 0 yS
`� I 1 aDQ „` i i s� ..i:.
j
7,
S
...... . ,,.
, \%, •, j R-4 B-i '' 'i. :i't _-'_r-_-J�Q�-Itii�i-JYf -__- -
, i , < ,--„, --------
1 , ifr )4" - i 1
. 1 3 4.) ---) ;:i r :— --42, i
1--\iI ^' :QI-1-4•.r
5 ZONING
BLACK RIVER
OFFICE PARK
NORTH R. W. THORPE & ASSOCIATES
45
SECTION THREE
EXISTING CONDITIONS, IMPACTS, MITIGATING MEASURES AND
UNAVOIDABLE ADVERSE IMPACTS
I. INDEX OF ELEMENTS OF THE ENVIRONMENT
A. Elements of the Physical Environment
Earth
Geology 47
Soils 47
Topography 48
Unique physical features 49
Erosion 48
Accretion/avulsion NA
Air
Air Quality 50
Odor 50
Microclimate 50
Water
Surface water movement/quantity/quality 53
Floods 56
Groundwater quantity/quality 58
Runoff/absorption 53
Public water supplies 90
Flora
Numbers or diversity of species 59
Unique species 59
Barriers and/or corridors 60
Agricultural crops NA
Fauna
Numbers or diversity of species 62
Unique species 62
Barriers and/or corridors 62
Fish or wildlife habitat 63
Noise 64
Light and Glare 73
Land Use 74
Natural Resources
Rate of use 76
Nonrenewable resources 76
Risk of Explosion or Hazardous Emissions 77
46 L F
B. Elements of the Social Environment
Population and Housing 77
Employment 79 -
Transportation/Circulation
Vehicular transportation generated 81
Parking facilities
Transportation systems
Movement/circulation of people or goods
Waterborne, rail and air traffic
Traffic hazards
Public Services
Fire 82
Police 83
Hospitals 84
Parks or other recreational facilities 84
Maintenance 85
Other governmental services 86
Energy
count required 88 1 -
Source/availability 89
Utilities
gy 88
Communications 90
Water 90
Sewer 91
Stormwater 92
Solid waste 92
93
Human Health (including mental health)
Aesthetics 94
Recreation (See Public Services - Parks & Other o
Recreational Facilities) �4
Archaeological/Historical
95
Additional Population Characteristics (See Housing and
Population)' 77
Economic Factors 96 —�
iy
47
II. ELEMENTS OF THE PHYSICAL ENVIRONMENT
1. Earth
A. Geology
Existing Conditions
The site is located on the lower Green River alluvial plain. The
plain was deposited 10,000 to 15,000 years ago by continuous river
action following the retreat of glaciers from the Puget Sound area.
The physiography of the lower Green River Valley is characteristic of
a mature valley with the river meandering frequently along the
corridor.
Impacts
None.
; _ Mitigating Measures
None proposed.
Unavoidable Adverse Impacts
None.
B. Soils
Existing Conditions
The surface soils in the Duwamish Valley are typically silts and very
fine sands deposited by flooding with some clay and occasional peat.
The U.S. Department of Agriculture, Soils Conservation Service Soil
Survey for King County, 1973 indicates the site is within an area
designated as being covered by Woodinville Series. Woodinville
Series is made up of nearly level and gently undulating, poorly-
drained soils. Slopes are generally 0 to 2 percent. Soil borings
taken on the site are analyzed in detail in Appendix A.
At shallow depth, these borings encountered generally soft, water-
saturated, fine, sandy silt with interbedded layers of silty fine
sand. This horizon varies from 5 to 12 feet in thickness. The lower
stratum is a loose to medium-dense, water-saturated, slightly silty,
fine sand. These soils are probably flood deposits from the Black
River.
48
Near the southern edge of the railroad tracks a large quantity of r !
li
uncontrolled fill has been placed. This fill , 12 feet thick in some
areas, contains large pieces of concrete, steel , and wood along with
saturated grey silts and sands.
The soft silts, loose sands, and uncontrolled fill are not presently
suitable for support of conventional spread or continuous footings
without remedial action. These materials are very low in strength j
and are highly compressible under conventional foundation loadings.
These soils will require a preload or surcharge fill , or pile-
supported foundation and possibly floor slabs will be necessary. An
extensive surface and groundwater drainage system probably will be
necessary in some areas.
Impacts
Existing topsoils will be repositioned or covered due to excavation
and filling activities. It can be expected that up to 70 percent of
surface soils will be displaced, compacted or covered as a result of
the development.
Erosion during construction should be minimal due to the low slope gradients of the site.
Mitigating Measures
Excavation and grading operations on the site will be performed in
conformance with the City of Renton Mining, Excavation and Grading
Ordinance.
Unavoidable Adverse Impacts l
The addition of fill will reposition or cover native soils. —'
i�
C. Topography
Existing Conditions
The topography of the site is generally level with variations in
elevation of approximately 12 feet where a large quantity of fill has
49
been, placed. Just south of the railroad tracks, the topography of
the site generally slopes downward towards the south at a very low
gradient.
Impacts
Grading and filling will occur in order to provide stable foundations
for flood proofing. Changes in elevation are expected to vary only
slightly. Approximately 100,000 cubic yards of fill will be necessary
to bring low lying portions of the site above the 100 year flood plain.
Mitigating Measures
Topographic changes could be restricted to limited areas of the site.
Unavoidable Adverse Impacts
Changes in contours of the site will occur.
rI
D. Unique Physical Features
Existing Conditions
The site is part of a 70-acre climax riparian hardwood ecosystem, the
last remaining example in the lower Green River Valley (Refer to the
discussion of Flora in Appendix C of this document.
The site is adjacent to the Springbrook Creek at the southwest corner
of the site. The creek is considered a "shoreline of significance"
and is protected by the Shoreline Management Act of 1971. The creek
will eventually be part of the planned P-1 Drainage Channel as
described on page 86.
The old Black River Channel meanders through the southern part of the
I
site.
Impacts
Develoment of the proposal will necessitate removal of much of the
portion of the riparian forest located on the site. Springbrook
Creek will remain unaltered. The Black River Channel will be
protected by a 50 foot setback from the top of the bank.
50
Mitigating Measures
a) Existing vegetation will be preserved on significant portions of
the site.
b) A master landscape plan will be prepared to ensure good design
practice and preservation of as much of the riparian vegetation
as possible.
c) As many of the existing trees as possible should be retained
through maintenance of greenbelt areas in order that the large
groups of trees and understory remain undisturbed.
d) The Black River Channel will be protected by a 50-foot setback
from the top of the bank.
Unavoidable Adverse Impacts
See Unavoidable Adverse Impacts for Flora, Fauna, and Surface Water
Quantity/Floods.
2. Air
Existing Conditions
The site is located in the - Green River Valley and has a typical
northwest Pacific Coast marine climate. During the fall and winter,
prevailing winds are from the southwest, and during the late spring
and summer from the northwest.
Low-level temperature inversions may occur in the Valley which,
coupled with low wind speed, can result in the trapping of
pollutants. This condition is most prevalent during the winter
months.. ' 1
Data accumulated by the Puget Sound Air Pollution Control Agency I
(PSAPCA) indicates that the concentration of suspended particulates ,J
in the Renton area has generally increased with increased
•
urbanization of the Valley.
it
, 51
The following tables summarize data collected at a number of
monitoring stations in the general vicinity of the subject site.
TABLE 1
SUMMARY OF SUSPENDED PARTICULATE CONCENTRATIONS
RENTON AREA
•
Distance Suspended Particulates Washington
From Site (micrograms per cubic meter) State
Location (Mi .) 1980 1979 1978 1977 1976 1975 Standard
Renton Municipal
Bldg. 1.5 -- -- 37* 51 50 37 60
S. 2nd & Lake Ave. S. 1.0 -- 59 55* -- -- -- 60
S.E. District Health
Center 2.7 39* 43 36 38 38 27 60
Southcenter 1.2 49* 50 46 48 45 34 60
(Source: Puget Sound Air Pollution Control Agency, Air Quality Data Summary,
1977 and 1978; 1979, and 1980, Quarterly Air Monitoring Data Summary, Department
of Ecology, State of Washington.)
— * Based on less than 12 months data.
TABLE 2
OTHER POLLUTANT CONCENTRATIONS
PARTS PER MILLION (PPM)
Carbon Hydro- Nitrogen
Monoxide Carbons Dioxide
(Ppm) (PPm) (ppm)
Distance Study
From Site Period 1 Hour 8 Hour 6-9 AM Period
Location (Mi .) (mo.,yr.) Max. Max. Avg. Avg.
Puget Power Yard 1.8 6-7, 1977 3.2 2.0 0.37 0.02
3-4, 1977 4.2 3.3 0.28 --
10-11, 1976 8.1 6.6 -- 0.01
6-7, 1976 2.2 1.3 -- 0.04
(Source: Washington State Department of Transportation 1977 Monitoring)
52 •
TABLE 3 �J
WASHINGTON STATE AMBIENT AIR QUALITY STANDARDS F-,
Carbon Monoxide - 1 Hour Standard - 35 ppm
Carbon Monoxide - 8 Hour Standard - 9 ppm
Hydrocarbons - 3 Hour Average - 0.24 ppm
Nitrogen Dioxide - Annual Average - 0.05 ppm
(Source: Washington State Department of Ecology, 1980 Quarterly Air Monitoring Data Summary, September 18, 1980.)
Table 1 indicates the particulate levels are approaching but are still
within the Washington State Ambient Air Quality Standards. Carbon
Monoxide levels are within the standards. However, an automobile-
related pollutant, hydrocarbons, is in excess of the Washington State
standards.
Based on the proximity of the site to the monitoring stations, it is
expected that the air quality conditions are similar to those
i
recorded.
Oxides of nitrogen are well within the annual standard showing the
highest average levels during the summer months. There is a small
amount of pollutant emissions due to railroad activity on adjacent `
rail lines, although the activity level is quite low. The emissions
produced by railroad activity are negligible when compared to the 1
total emissions from vehicles on S.W. Sunset Boulevard and Hardie I 1
Avenue S.W.
The site is currently devoid of any noticeable odors, except for
occasional emissions from the Metro Sewer Treatment Plant.
Impacts
Suspended particulate levels will increase over the short-term due to
construction activities, particularly during excavation and grading.
Noxious odors will be produced from asphalt paving operations, diesel
powered machinery and roofing materials.
53
Long-term increases in automobile-related pollutants will occur as
local traffic levels increase due to implementation of the proposal .
However, progressively more stringent federal air emission controls
may improve the expected vehicle-related pollutant levels.
Mitigating Measures
a) Low emission construction equipment will be used whenever
possible.
b) Measures to control construction dust, such as watering, cleaning
and sweeping of streets at the end of hauling activities should be
performed by, the contractor.
Unavoidable Adverse Impacts
Implementation of the proposal will impact area air quality due to
increased paprticulate levels and short-term odors during construction
activity, and increased air pollution from automobile emissions.
3. Water
A. Surface Water Quantity/Quality
Existing Conditions
The project lies within the Black River Watershed, wherein Mill Creek,
Garrison Creek, Panther Creek, Springbrook Creek and other unnamed
streams are tributary to the Black River. The Black River discharges
into the Green River which becomes the Duwamish River.
Surface water is present on the site in the form of seasonal wetland
and stormwater runoff, which due to the flatness of the terrain and
the fine grain of the soil material , drains poorly into the Black
River Channel .
Three drainage ditches extend northerly from the 18th fairway of the
Earlington Golf Course and serve to disperse runoff into the grove of
Black Cottonwoods at the southern perimeter of the riparian swamp.
These ditches contain standing water during most of the year. In
addition, the old railroad grade forms a trough roughly 10-30 feet
54
wide and 3,200 feet long which is inundated with standing water most
of the year.
Ponding also occurs in two pools positioned to the north and south of
the railroad switching yard fill embankments in the north-central
portion of the site. In general , the riparian forest is dotted with
wetlands containing standing water for all year save for a few months
in the summer season.
According to the Earlington Park Water Quality Impact Assessment
conducted by Entranco Engineers in 1980, both the Black River and
Springbrook Creek have a history of violations of the State Department
of Ecology Class A standards for total coliforms. The Black River
exhibits relatively high nutrient concentrations and low levels of
both dissolved oxygen concentrations and turbidity. Springbrook Creek
is characterized by high bacterial contamination and nutrient
concentrations; in addition, state standards for dissolved oxygen
concentrations are exceeded. However, neither of these water bodies
demonstrated evidence of grease and oil .
The degraded quality of these water bodies results from surface water
runoff from residential , commercial and industrial land uses which
contains high concentrations of pesticides, biochemical oxygen
demand, bacteria, traces of toxic heavy metals, oil and grease and
suspended (and settleable) solids.
The Earlington Woods Planned Unit Development presently under
construction and located east of the subject site will continue to
route stormwater runoff on the western portion of that site through
the subject site. Temporary detention ponds will be constructed on
the Earlington Woods property and will be utilized until construction
completion. Stormwater runoff on the western portion of the
Earlington Woods site drains southward through a 24 inch pipe under
the railroad tracks then enters natural surface water courses on the
subject site and eventually flows into Springbrook Creek.
55
Impacts
Development plans call for 13.39 acres or about 22.5% of the riparian
forest to be retained on the site, which will continue to accommodate
surface water runoff. However, the increase in surface water runoff
due to the addition of impermeable surfaces, coupled with the removal
of the majority of the riparian wetlands will result in a substantial
alteration of existing drainage patterns throughout the site.
In accordance with the East Side Green River Watershed project, (of
S.C.S.) , drainage from the site will not be detained, but removed from
the site as quickly as possible. Increasing the rate of runoff will
enable floodwaters to reach the P-1 pumps more quickly, thereby making
it possible to pump a much greater volume of floodwater out of the
project area before the safe capacity of the Green River Channel is
reached and pumping activities have to be reduced in conformance with
Corps of Engineers requirements for operating Howard A. Hanson dam.
It is planned that stormwater runoff from the site will be directed to
the Black River Channel where it will receive wetland treatment prior
to discharge into Springbrook Creek.
Runoff temperatures during the summer could increase the temperature
of Springbrook Creek. However, discharge into the Green River
following periods of rainfall is infrequent during the summer. During
the winter months there is not likely to be detrimental temperature
impacts.
Oil/water separators could remove most pollutants. However, some
dissolved pollutants may be carried off the site into the Black River
Channel .
Springbrook Creek will remain unaltered. Off-site runoff from
Earlington Woods Planned Unit Development flowing to the subject site
will increase due to an increase in impermeable surfaces.
56 ' '
Mitigating Measures
a) Temporary detention and settling ponds should be utilized during
construction of foundations to collect silt and minimize
turbidity.
b) Stormwater runoff will be collected in a storm sewer system
approved by the Renton Public Works Department.
c) Oil/water separators should be utilized to remove petroleum
products from stormwater.
d) Adequate street and parking area cleaning and maintenance of the
stormwater system should be provided.
e) Catch basins and screens should be included in the stormwater
system to collect litter and debris.
f) No development will occur within a 50 foot setback from the top of
the bank of the Black River Channel .
Unavoidable Adverse Impacts
Coupled with increasing runoff and pollutants from adjacent property
that pass through the site, surface runoff from the site will increase
and urban pollutant levels in the runoff will increase, particularly
during construction.
B. Floods (Refer also to East Side Watershed Project, p. 86.)
Existing Conditions
Construction of both the Howard Hanson dam on the upper Green River
and a levee system on the lower Green River eliminated over-the-bank
flooding at levels less than a 100-year flood. However, as a
consequence of the raised levee system to contain river flows,
drainage of the valley to the river by gravity flow is precluded in
times of flooding. Flooding of the general vicinity caused by Green
River flood waters backing up in the Black River Channel was
eliminated when automatic flood gates were installed. The flood gates
57
were eventually replaced by the P-1 pump station. Pumping capacity of
the existing structure is 2,945 cfs, but is currently being utilized
at less than 10 percent of rated capacity during flow conditions.
Once the P-1 Channel is completed, it is estimated that during a
100-year flood that at least 44% of the total flow from such a flood
will have been discharged into the Green River before the rate of
pumping must be reduced because of increasing flows from the Green
River.
The P-1 Channel will be approximately 8 miles long. About two-tenths
of a mile at the pump plant is already completed; the remaining 7.8
miles will extend to the City of Kent, generally following the courses
of Springbrook Creek and Garrison Creek.
Impacts
. In conformance with State Flood Control requirements, roughly 100,000
cubic yards of fill material will be utilized to bring the lowlying
portion of the site to the 100 year design storm elevations. This
u would reduce by one-half the existing flood storage volume on the
site. The 100-year design storm elevation will be reduced once the
P-1 Channel is completed.
Mitigating Measures
a) Fill material will be required to bring some building sites above
the 100 year flood plain which will prevent on-site flooding.
b) Some areas couldbe left unfilled which may reduce the amount of
y ! flood storage displacement that occurs on the site.
Unavoidable Adverse Impacts
Project development will result in increased surface runoff and
simultaneous reduction in flood storage capacity of the site, which
+ _ will contribute to flooding conditions until the construction of the
P-1 Channel and detention pond is completed.
58
C. Groundwater Quantity/Quality
Existing Conditions
The groundwater within the property is very high and corresponds
closely to the water surface in the Black River Channel . Groundwater
levels fluctuate from 5' to 10' annually.
The increase in surface runoff from upland residential development,
,
together with disrupted drainage patterns on the Valley floor caused
by construction and fill activities, have both contributed to a
general raising of the water table.
Wetlands containing standing water all year except for a few months in
the summer are interspersed throughout the riparian forest on the
site. Please refer to the discussion of "Surface Water - Existing
Conditions" on page 53 for details of the site' s ponding
characteristics.
1
Impacts
Infiltration of precipitation into groundwaters through the surface
soils will be reduced, becoming mainly surface runoff which will be
directed to the old Black River channel .
}
Construction of industrial uses and the addition of automobile traffic
will replace nutrients from vegetation and rainwater with pollutants
from paved surfaces, petroleum products, sediments and heavy metal
traces from automobiles. It is not expected that pollution of
groundwaters will occur to any measurable degree; however, the
potential of contamination resulting from a spill does exist.
It is expected that groundwater level fluctuations may increase with
development; both rising higher during periods of peak flow in the Black
River, and sinking to slightly lower elevations during dry weather. i~N
The average height of the water table is not expected to increase.
59
Mitigating Measures
A reduction in building site coverage could require less filling.
Unavoidable Adverse Impacts
Alteration of groundwater quantity, quality and movement on the site
will result from development of the proposal .
4. Flora
A site investigation and analysis of resident flora and fauna species
currently existing on the site was conducted by Mike Lee, Landscape
Architect. This analysis, from which the following discussion has
been extracted, has been included as Appendix C in this document.
Existing Conditions
Approximately 11.5 acres located in the northern portion of the site
near the railroad tracks have been cleared and utilized as a dump
site. Vegetation on this portion is sparse.
The remaining 59.5 acres of the site comprise a major portion of the
Black River floodplain. The river, which once connected Lake
Washington to the Duwamish River, was cut off from its source when the
level of the lake dropped after the opening of the Lake Washington
Ship Canal in 1916. Since that time, a slow, narrow stream has flowed
through the south edge of the floodplain in an old channel while the
remainder has grown up into an extremely dense wetland deciduous
forest, comprising from 70-80% of the riparian land area. This type
of vegetation is never particularly common and such a large and well-
developed area of it is rare in the Seattle area.
The forest consists primarily of Ash, Cottonwood, Willow, and Alder
with an understory of Blackberry, Knotweed, grasses and herbs. No
rare endangered species were found on the site during the survey.
There are a number of plant communities as shown in Figure 6 . The
communities are not distinct, but rather have been defined by the most
prominent species in the area. The community as a whole is unusual in
composition and maturity. (Please refer to Appendix C.)
PLANT COMMUNITI5
llll! Ash/Cc641000d
111111 Cottonwood
Ei Cottonwood/Willow
® Willow grove
0 Willow savanna
Alder
r1 blackberry/Hawthorn
Kjnatwmd
Grass/herb
:Etiei?�tRltinn:�..:.r•?:_�:�y L �,.:e@t t
• � �I� i11� ` —hI
I1i(' I .., , ---
�IIiY':Ya.111I1tiI' it .•: I - III I'I (( f.• •'I
UI YU4UIIW
1 IIIW —
II�1:14 1••• 1 Y111111/ WYY1"�• 1 '� �
uu.i •
Yn W '6\\\ �DV�'.i ••••.1 IIII ((�IL I I11�i I
Ii11Y1111Y111 I.
6•
VEGETATION
BLACK RIVER
INDUSTRIAL PARK
SOURCE: MIKE LEE/LANDSCAPE ARCHITECT R. W.THORPE & ASSOCIATES
61
, Impacts
Upon project development about 78% or46.11 acres of the wetland forest
would be replaced by buildings, parking lots and roads. The remaining
vegetation would be affected as follows:
, ,
1) The trees of this community are all shallow-rooted and not
tolerant of soil compaction from heavy traffic or paving. Most
would tolerate a heavy layer of crushed rock and light traffic,
but any heavier use of the soil would cause a gradual loss of
trees.
2) Development of the site will cause drainage of wetlands and
lowering of the groundwater level resulting in a gradual change
in forest composition.
3) The trees on this site are susceptible to wind damage. This will
particularly be a problem when trees are cleared or thinned,
removing the protective barrier. This could create a potential
hazard to the property once developed.
Mitigating Measures •
a) As many of the existing trees as possible should be retained
through maintenance of green belt areas in order that large groups
of trees and understory are left undisturbed.
b) A master landscape plan will be prepared to assure good design
practice and preservation of as much riparian vegetation as
possible.
c) Placement of building sites., parking lots and roads should be
based on tree inventories provided by field surveys.
d) Vegetation along Black River Channel should be preserved and
maintained by the proponent.
62 'r
Unavoidable Adverse Impacts
Up to 78 percent of the natural vegetation on the site will be removed
from the site when the proposal is implemented.
5. Fauna
Existing Conditions
The site is rather special in providing a wetland deciduous forest
habitat, an uncommon feature in the Seattle area. The extent of the
site and its largely wooded surroundings would suggest a long bird
list, although six site visits showed a relative scarcity of wildlife
in general . However, the time of year (September) was probably a
factor since previous surveys (May) found much larger numbers and
kinds of birds.
There may be several other reasons for the lower wildlife population
observed here. First, there is no large body of water, although the
stream does attract some waterfowl . Second, there are no evergreen
trees or shrubs, which are needed by many birds and easily found
elsewhere. Third, the site is relatively narrow, with railroad I
activity on one side, the Earlington Golf Course and industrial
development just a few hundred yards away. This narrowness dilutes it
the large size of the site. Fourth, the site is rather isolated from
other similar vegetation communities. Many birds will find little
reason to move to this site from larger deciduous forest networks east
of Lake Washington and in Pierce County. Of these, the last two
conditions have been accentuated in the years since the 1974 study.
Increased construction, traffic and noise on all sides have
undoubtedly caused a deterioration of the site's wildlife capacity.
The most positive aspects of the site for wildlife are its maturity
Jj
(in parts) and the major role it fills in the total wooded and open
space network between Monster Road and Empire Way. Enhancing its
importance to wildlife are the Earlington Golf Course to the south and
the wooded hillside to the north, together providing a rich variety of
habitats. From those characteristics, it is safe to assume that many
birds at least occasionally visit the site, and nest or pass .through
i '.
63
the entire area because of its total extent. Thus the removal or
compromise of the Black River site could well discourage many bird
species from using the area in general . The bird list, while specific
to the site in question, assumes the continued presence of at least
some of the surrounding vegetation.
The list of mammals, reptiles and amphibians in Appendix C of this
document are taken from the 1974 Wilsey and Ham report and annotated
to show current abundance of the species. These are estimates based
on the habitat deterioration of the area since 1974.
Regardless of the environmental degradation around the site, this
tract of wetland remains for both wildlife and plants an especially
large, mature and varied habitat, considering its urban location. As
such, it is one of the only habitats suitable for certain species in
the Seattle metropolitan area.
A Washington State Department of Fisheries report indicates that
Springbrook Creek is one of the more important tributaries supporting
runs of Coho and chum salmon. Another anadromous fish using these
waters include steelhead, sea-run cut-throat, and Dolly Varden.
Impacts
Clearing of vegetation from the site will reduce wildlife habitat. •
Intrusion of human activity will drive many species to alternative
habitats. There; majority will be lost in competition for the
remaining habitat. Migratory and predatory species using the site for
nesting or feeding will be at least partially displaced. The
reduction in food supply will further reduce resident and migratory
species. Species which are more urban tolerant may inhabit the site
in the long-term.
There may be a reduction in fish population due to increased turbidity
and higher water temperatures, particularly among the juvenile fish
population.
64
Mitigating Measures
a) Landscaping materials that provide food sources for birds and
small animals should be utilized. I
b) As much natural vegetation should be retained as possible.
c) Surface water quality along Springbrook Creek should be preserved
by planting natural riparian vegetation along the drainage-way
banks and maintaining wetlands wherever possible.
Unavoidable Adverse Impacts
Reduction in numbers and diversity of wildlife species will occur as a
result of habitat elimination and modification and introduction of
human activity.
6. Noise
Noise levels in this statement are expressed in A-weighted decibels,
or dBA, which best describes the human perception of noise levels.
Each increase of 10 dBA in the noise level is subjectively judged as
an approximate doubling of loudness.
A fluctuating noise can be described statistically by the noise
levels exceeded for given percentages of time during a prescribed time
period. The commonly used statistical levels are L99, L90, L50, L1'0
and L1, for which the number in the subscript indicates the percentage
of time that the given level was exceeded. The L99 and L90 are
indicative of background noise in the absence of local noise events.
The L50 is the median level , exceeded 50 percent of the time. The L10
is usually indicative of noise from typical traffic events. The L1 is
the level exceeded one percent of the time, and is usually indicative
of the highest noise levels from trucks, buses, and aircraft.
Existing Conditions Calibrated noise measurements were taken at two locations in the site
vicinity on April 3, 1980 between 8:00 a.m. and 9:30 a.m. Refer to
Figure 7 for location of sampling stations.
VJ
=--e--a. '^"tip: "i• �a
?m ;., '•� —'.;3-.,w:. :'ir ,.:,;;:'•<,. ,`, •,-':,., .;ay,' 'v.3.. `. r„> :ig,,,k ','( !,, my '^;,
ti�' .,•w-h'•",-%:"t :':°s'�•:•, ,�.;. :�'?v,.,.. :i,r.'✓Y'�S•:.a.�<R _�,.�� I�'ay�,$y� .,.4.i$s>ry �lj�'a�'%,,•.
�Y,-:.�pz` t,<~✓.'4.;'`;:u .yM.;J-.w,r, w , �y��.^'•y ,n il. .1..
l! ,"'+- $ { L° nv•! ,x`F.,::.L`,t. '. ,Po .r^y^we'ee: }�' !
„S. .'.�"`. 'N:'y: v. ''_ e °j�.",3Y:i•' is
f eyy..
r� 3' t arc
/. it r� 4 "'rc�gi,�•^-...,, "w,,•.•�mw, r:.. ' v;`t;:" ;i. ,r`,''.•.,,,, ,. 's.,:. a;Ei, �: (�_ �"*:,✓
y � ..•, .- { ✓,A. ,',�� yam:n7�'.�. qF..� : k 4Y.�n7.Ms+yM4CYKY3 ^R�fd[
y ,¢{i -_�CLE --.-1-• - ;-{=- '""4.•'; •,; $ }: is .- '.',' ':31,,,,, :`Y';;> „ , ;!•:;',V. . is/4 1 ,w`
��,74' _s� k -h ''n ••J, ,:`: i Z.;�;, ' gym' Ai it ' 1!'
1' f` t, � ✓"",�y� .SsPJ..-""•.P: »^.�"^-.-•.4'":' _+..e' s, ^`�` •'.•'��;%.'.3;: ...L. ^,s"•3°le}y,=�'�: K„�rya .ea '�?;� y�a �i k'n ;// 'D �,.y,• /�, -- , ' •,i i `• 'i :d . $,,:n :-;C".4i',•b:;' ,i,,,a.`�.`Si:::,q ,.r.:,.uSr s� ,, ,,c .,'•. it I.
I 1, Ni-"...... / t _xS>-- G�. '_—.,,,� \`"...,-�_/{�./.)`•.':'r^ a v:;W��7d:•�PAr` ,r.(.:a:• �':zLl:.'i'� C,,,k'.,at^:«.•�Y.a^�/j� y N `a^i/ // °9 7i' w•l 14 'C.•� .--',�:
1 i ".,,.._,' •'mil •--_,— ..— `.!, '. ••'.Fti, .:;:'t..,#,,,$:,•.: „ LZJ{ �./. ,„", 6{ ?�r^Y;..,h 8`^.Y£ili*':.,
j , _ .. _ ..a;,?:,�,: .....-,.,•-+...,z�. ;..?'•.�F Ic,'.•..-•.�Nr:�3^'' a +,�' SLe....' � a�'t 1.
.t \ ; iT• f-.,...w ' �'L •:. R': s:.•:'±.� ; , 5,':a ,x.,.s._: .-,:,; 1:
( 'Y jJ `'� w Wia. Z"u S .i;'.,`,.aiy 77.: ..a,:sg, aw*a ..i'r',,:'e'y't";- i,';'•: :.t•--
1 t ��'�1,[Y� ~.`/„ J -//,,... :...._e---;,,\ may,,1,;:�~�'' %:a>:•.:-:�,�.?s'5:: «i,?,� :t,..t.-.z „}.. ,C :Y,&�' !" ,.•..,.•24 .:•. , Y'
fir'+ 1yl�° of ,...`w. .£'., . °t
'> ..,u^^>X<F`t.� --�y' -�, (yam-:o. -�=s: ,�.,�. t% "�!``�, „: t,:
p •,,z•
s,' ',1,. fj / Y \ �'�' -•'Vic.,r;,Y'::}.il':s' - ..,.��:-. r At,4 1,\,,�. 3e='t j:,-.
% J e� ,,, OO'Y`il: d Y:J k�,'-:.._^'4b s'.$•-'.''.' '•'vrX'.e
c,7 so
\mil .3.1$, �"%ex''' 1 f. r' • i r. " .,:r.. , "1";> = : f , w .1.- `rd,
i,..,�3�.m '+"f S/� i^" ",••r'+•�,"�",'�, ;�" 4, 1 r-1»;l".. c:•VS�;S.�•..a.6+�L'..T� •it\ K:�A ��k' S1�,•..;":�•f:;:i•:�;:'': f'.°:
'C`;,� ��`�' a ,r'. ... r>W k �.. ,s._:.:'s•�:- v..•�� A:�,4::;�:=. .•Gca`,.,`�Y'",g.
,,E4.?,R „.4--.-! j . :. f hfl \,y. .�L•..z- ty�z Yr`'"S''., \O� r^ ': �r •°:..?••d,.. .n:Y '^:_�`•;.
h / '
�7.' w•",`-i 7 �°'. � ��� "'�.�.a.s (Jffg{� �»�1 YFw'':.:-..w' ry J e.r. • .:.
,a• w +- "ir;-.'.:: :i .$.,,tea
,
w,
:� - \�� Golf Course '" ' • d�l; s �u a# \-:
1'7��_1 �j1��L' 1 k I, , ,,,,,,,,,,,,_
mo"`; ) r.-. '•' " L•4,J •
itYt::;+' J (-Iva, as , °` tl .....�` :i,.-�.-,-.-a=�s .,-r,. ', r _ _F�,
II ,
�y;^� 7. \ i t i # ` tot_ ...:u.... r fit. i
r \( w, u,,, Sewage GRp`i r';%A° `--= "
;:.. �� awy� ; yam^ lq �ter , �•
i'l ,,,, _ t‘,17!---.7-1-$—'; ,..' ..4.-,---.-;11' i. ‘4' _.,, vp: ,,,,,vattzt,„..,,,,F, '. .
}/ \ ) 4 i } ,:tiA '1 405 s.,liLr--- 7i =! s'�t. <NI°. ;s',"- s s,`
l
�' ✓` wq I ��oe °ll�b « q, ". m`3 N n�7 rL .- _? €'%+ y�> 'A 13 svr "mr m"!
\'�_: .r--.._. .--tt• k1 \ "'t.,' , ,, 3-, 1 B M! 1116 } IF t + wig •. �..,., "Y
J D S . wJ
/ !' 9 » Ii it Y'a: +'• 1 sfsw 1
//1; 1 „„� max,-- -_':c°41�11 r -'.. :.1F-}jx7i. �� li I! c a r,i D e,'"Ap o t�l
' u, 'i a" � �r'.h' �r i it • 1 t,'t aai�i'2.'k �I Y 41 l a 'o c�6• ''!mu' j
o-�''i:k •+ Ymlcz3l,,. n IA I B' • as n
! .�l\\ I La�gacre I ,t ______�'� i'` "Q � nk . = l/
y'" 1, 1 I i is.,,,.m q "� �.
t;: k f I less: P'Ii�° rG'=
\\j... rr z '1 i '�;'-;7 _I Iw r:d. g 4� - --1 1 a r ra
L:
5°f ! n ,Ili r I 3 ,A1 11 n. L"w
1 t:; m :j 111 (4'4.
Y
it czt
:: � \ �i
���'ft ___ JUI.
`•=r Track =,',:l ' k� jk/
r s, Ins l _�� _�_ _ _a_ ,_ -- '�y�, _�ar-
%il
a °' ' " t
'- `'=11 al —� _—_ V=— ) 1I RI Reservoir k'{ % 0 1'1\1''1 \ Li
•
•
7 NOISE MONITORING STATIONS
C 1000 2000 BLACK RIVER.
u.s.G.s. BASE OFFICE PARK
NORTH R. W. THORPE & ASSOCIATES
66
High noise levels in the area of the proposed action are due primarily _!
to motor vehicles operating on public highways (traffic on Grady Way,
Monster Road and I-405) . Other sources of noise include low-flying ;I ;
aircraft, lawnmowers and occasional sounds related to the warehouse
use to the southeast of the project site. These sources are
approximated by the existing noise level readings shown in Table 5.
Rail activity (Burlington-Northern Railroad) is present on the
proposal site, however, there was not activity by trains on the
adjacent rail lines during the measurement period.
Traffic sounds are classified as an "industrial" source of noise
according to the coordinator of the Seattle/King County Department of
Public Health Noise Abatement program. Accordingly, maximum noise
levels for traffic recorded in receiving properties developed for
commercial uses, which includes manufacturing park uses, should not
exceed 65 decibels (dBA) under the King County Ordinance.
The Washington State Department of Ecology (WAC 173-60) has
established maximum noise levels permissible for various areas or
zones called EDNA's (Environmental Designation for Noise Abatement)
which are classified by use as follows: .
Class A - Residential areas, where humans reside and sleep
Class B - Commercial areas
Class C - Industrial , storage and warehouse areas
Maximum noise standards for these environments recommended by the
Washington State DOE are shown below:
li
LI
1,
67
TABLE 4
WASHINGTON STATE DOE NOISE LIMITATIONS
EDNA of Receiving Property
EDNA of Noise Source Class A Class B Class C
Class A 55 dBA* 57 dBA 60 dBA
Class B 57 dBA* 60 dBA 65 dBA
Class C 60 dBA* 65 dBA 70 dBA
* From 10 p.m. to 7 a.m. - 10 dBA reduction for receiving
property within Class A.
These noise levels may be exceeded on the receiving property by 15 dBA
for 1.5 minutes, 10 dBA for 5 minutes and 5 dBA for 15 minutes for any
one hour, day or night.
The L1 levels shown on Table 5 below represent maximum noise levels
recorded on the site during daytime sampling in April 1980. These
levels range from 63 dBA to 68 dBA. Average noise levels (L50) within
the site vicinity are about 55 to 56 dBA. Under the provisions of the
Renton Zoning Code, Section 4-734(K) , continuous levels must not
exceed a maximum of 70 dBA with adjustments for types and duration of
noise.
TABLE 5
EXISTING NOISE LEVELS IN DECIBELS (dBA) IN THE VICINITY
OF THE PROPOSED BLACK RIVER DEVELOPMENT
Station
Number Location L1 L10—L50_1,90 Date and Time
1 South of site,
about 50' east of
Springbrook Creek 63 56.5 55 51.5 April 3,1980 8:20 am
2 Parking lot of
Empire Estates to
the north of site,
150' from c.l . of
Empire Way. 68 61.0 56 50.0 April 3,1980 9:00 am
}
68
Readings were taken by R.W. Thorpe & Associates using Quest ANSI 21.4
(Type 2) sound level meter with an attached wind screen. The sound
level meter was calibrated with Quest 2G-2728 calibrator before and
after each set of measurements. Weather was sunny and about 48
degrees with high clouds and winds between 0-5 miles per hour.
Noise Exposure Forecast contours for Renton Municipal Airport show the
site to be outside the Noise Exposure Forecast (NEF) 25 line, although
aircraft activity is audible. Aircraft activity is expected to
increase slightly since the number of flights using the airport is
expected to increase in the next 20 years according to the 1978
Airport Master Plan. (Source: Earlington Woods PUD DEIS, January 1979.)
During the daytime hours, there is occasional rail activity on the
lines adjacent to the site. Typical ranges of noise levels for these
activities are shown in Table 6 for various distances from the noise
source.
TABLE 6
TYPICAL NOISE LEVELS (dBA)
AT VARIOUS DISTANCES FROM RAILROAD ACTIVITIES
Distance
Railroad Activity 50 feet 1/2 mile (2640' ) 1 mile (5280' )
Mainline Tracks
Coasting 75-85 55-65 --
Normal Pulling 89-98 66-76 44-54
Whistle 91-120 68-92 46-70
Railyard
Switch Engine 61-72 46-52 --
Switching Impacts 83-95 62-73 40-51
Source: Draft EIS for Earlington Woods Planned Unit Development, City of Renton
Planning Department, Renton, Washington, January 1979.
i, ,
69
Passing train noise levels can vary between 75 and 98 dBA at a
distance of 50 feet, depending on whether they are coasting or
pulling. At one-half mile distance, the range is 55 to 76 dBA.
Trains are required by law to sound their whistles when crossing a
right-of-way or when an object is blocking the track. Train whistles
can increase noise levels by approximately 15 dBA for very short
periods of time, but there are no grade crossings in the vicinity and
whistle noises rarely occur within a mile of the site. (Source:
Farlington Woods PUD DEIS, January 1979.)
Planned land use to the south of the site is industrial park, a
potential generator of noise from increased traffic and industrial
activities. Planned land use to. the east of the site is a Planned
Unit Development which would contain multiple-family housing and
business/commercial development. This residential use is considered
noise sensitive.
In summary, slightly adverse noise levels exist on much of the site
due to nearby vehicular traffic. Aircraft noise is audible but within
the acceptable range, and the adjacent rail activity produces
intermittent adverse noise levels for short time periods.
Impacts (Short-term)
During the construction period, noise levels will increase
substantially as outlined in Tables 7 and 8, pp.70-71 . Table 8
indicates the levels of noise generated by particular types of
equipment from certain distances. Table 9 illustrates the percentage
of time that machinery is operating at noisiest mode as well as the
potential abatement levels of that machinery.
The residences to the north of the site, as well as those to be
constructed to the east will be the most sensitive noise receptors of
the project construction noise.
__ Mitigating Measures (During Construction)
a) Noisy operations should be scheduled so that they are not
concurrent.
70 ' '
TABLE 7
ANTICIPATED MAXIMUM NOISE LEVELS FROM CONSTRUCTION EQUIPMENT !
y
Noise (dBA)
Maximum at ,
Phase and Duration Equipment Used 50 feet* At 100 Feet*
Phase I. Dump Truck 80-90 85 , -i
Clearing Bulldozer 80 74
Vibrating 76 70
Grader 85 79
Phase II: Backhoe 85 79
Excavation Bulldozer 80 74
Dump Truck 91 85 j
Concrete Truck 85 79
Phase III : Dump Truck 91 85
Foundation Saw 78 72
Concrete Truck 85 79
Generator 78 72
Concrete Vibrator 76 70 ,
Phase IV: Crane 83 78 _
Frame, Roof, Dump Truck 91 85
and Skin Air Compressor 81 75
Welding Generator 78 72
Concrete Truck 85 79 -
Concrete Pump 82 76
•
Phase V: Dump Truck 91 85
Finishing Air Compressor 81 75
Saw 78 72
Jackhammer 88 82
(Source: Bolt, Beranek and Newman, Noise from Construction Equipment and
Operations, Building Equipment and Home Appliances, U.S. Environmental
Protection Agency, NTID 300.1, 1971.) A'
71
TABLE 8
IMMEDIATE ABATEMENT POTENTIAL OF CONSTRUCTION EQUIPMENT
NOISE LEVEL IN dBA AT 50 FEET
Important
With Feasible1 Noise 2 3
Equipment Present Noise Control Sources Usage
Earthmovfng
front loader 79 75 E CFI H 40
backhoes 85 75 E CFI H 16
dozers 80 75 E CFI H 16
tractors 80 75 E CFI W 40
scrapers 88 80 E CFI W 40
graders 85 75 E CFI W 8
truck 91 75 E CFI T 40
papver 89 80 EDFI 10
Materials Handling
concrete mixer 85 75 ECFWT 40
concrete pump 82 75 E C H 40
crane 83 75 E CFI T 16
derrick 88 75 E CFI T 16
Stationary
pumps 76 75 E C 100
generators 78 75 E C 100
compressors 81 75 ECHI 100
Impact
pile drivers 101 95 W P E 4
jack hammers 88 75 PWEC 10
rock drills 98 80 W E P 4
pneumatic tools 86 80 PWEC 16
Other
saws 78 75 W 4
vibrator 76 75 W E C 40
1Estimated levels obtainable by selecting quieter procedures or machine and
implementing noise control features requiring no major redesign or extreme
cost.
2In order of importance:
T Power Transmission System, Gearing F Cooling Fan
C Engine Casing W Tool-Work Interaction
E Engine Exhaust H Hydraulics
P Pneumatic Exhaust I Engine Intake
3Percentage of time equipment is operating at noisiest mode in most used phase
on site.
' Bolt, Beranek and Newman, Noise from Construction Equipment and Operations,
Building Equipment and Home Appliances, U.S. Environmental Protection Agency,
NTID 300.1, 1971.
72
b) Phased development should be planned which would reduce the size of
movements of construction noise.
c) Construction equipment should be operated only between the hours of
7:00a.m. and 7:00p.m. Monday through Friday.
d) Only construction equipment that does not exceed State of Washington
maximum environmental noise standards should be used.
e) Construction equipment should be placed as far away from sensitive
noise receptors as possible.
f) Construction activity should be scheduled so that all truck traffic
does not occur concurrently in order to avoid vehicle congestion. _I
Impacts (Long-term) —,
The current noise levels of Interstate 405 to the south of the site
and the railroad switching yard to the north exceed the noise levels
likely to be generated by the proposed industrial park, Increased
traffic volumes, and rail traffic, as well as introduction of human
activity and reflective surfaces will cumulatively increase the local
noise levels.
In the event that only a portion of the site were to be developed, the
remaining riparian forest wildlife habitat would be adversely exposed
to increased noise and human activity levels resulting in disruption
of living patterns of more faunal species dependent upon relatively
isolated riparian situations.
Mitigating Measures
a) Landscaping, ,careful site design and berming should be utilized
near main roads to deflect noise and reduce its impact.
b) (See "Vehicular Transportation Generated - Mitigating Measures,"
page 81)• I
73
c) Installation of rubberized railroad crossings where the access
road would intersect the railroad spurs to the south of the site
would decrease noise generation.
Unavoidable Adverse Impacts
Increase in short-term noise due to construction and long-term noise
as a result of increased traffic and rail volumes and introduction of
human activity.
7. Light and Glare
Existing Conditions
The site is currently undeveloped and densely vegetated. Hence, no
light or glare is generated from the site.
Impacts
The proposed development would replace natural vegetation with
warehouse and office buildings and. parking areas which will be lit.
Low level security lighting will also be installed. Street and
sidwalk lighting will also be necessary. Light spill to surrounding
residences should not be a problem due to distance, topography and
vegetation. Some glare will be produced from the buildings and by
reflections from windows. However, intensity of these new sources of
light should not be greater than light generated from the manu-
facturing parks south of the site.
Mitigating Measures
a) Building wash lighting should not be used.
b) Perimeter landscaping, fencing and berming, especially around
parking areas and road entrances could reduce light spillage.
c) Parking area lighting could be directed so that no direct light
spills off the site.
Unavoidable Adverse Impacts
Light and glare will be emitted from the site to surrounding
properties.
74
8. Land Use (See Figure 8 on the following page.)
Existing Conditions
The general vicinity of the site is in a transitional stage in terms
of land use. The surrounding area is a mixture of industrial and
office uses, undeveloped areas, and single-family homes. Between the
Renton Shopping Center and the site are a scattering of single-family
homes. South of the homes and east of the site, land use consists
mainly of warehousing and some office buildings. To the south of the
site is the 18-hole Earlington Golf Course, the Metro Treatment Plant
and the P-1 pump station. West of the site is Monster Road. To the
north is Burlington-Northern Railroad tracks and beyond is the largely
undeveloped, heavily vegetated south side of Earlington Hill .
The site is a natural riparian forest heavily vegetated with
significant deciduous trees such as Ash and Cottonwood. (See existing
conditions, Flora, page 59 and Vegetation report, Appendix C.) A
narrow dirt road runs from Monster Road easterly along the south side
of the railroad tracks. The road has mainly been used by trucks when
dumping fill material on the northern edge of the site.
Impacts
The site will be converted from natural riparian forest into an office
park and warehousing uses. The project is generally consistent with
the Comprehensive Plan Map except for a small portion in the western
portion of the site which is designated as Greenbelt.
Actual building dimensions have not been calculated at this time.
However, very roughly estimated, the building area for office park and
warehousing would be approximately - 775.000 square feet and 155„000
square feet, respectively.
The proposed development is not expected to change the land uses in
the general vicinity due to the lack of undeveloped buildable land.
That land which is not developed in the general vicinity is either
proposed to be developed or is land unsuitable for development.
I D
.: ,•••-•..--.-•-- •-:•.•-•;••••••--.•• - ".-•/--•--•'•-•',,.-%!-.7.,7,::,,,;:::,7,‘„,-.:-.i,..,:,. -,:[,,,,,:;.,;..:,...,,,,:,...),..,..,...._.,:,:„......,,,,,..::„,.,.,„.i.1, ;!.o...!:::::!;:.:!.--.:-...,_--,,.-•:i-l--.. -,_.-- -:ig;...':..--::r. --.=,s.,-;--•':--;'t-.,!.-.:,.'-,•:':.,%.•...k::;',7,*:.:s.„-•.,'..:r!":'•:-:,:-:.:ti',...-'..±,;:1!::!.:::!'::.•':.,:-..-%..,..,;',7.,•,:!'st....•.-„,.:-..**;,!- ;,7. ,,,-. -..--•-•.;,.,,,;',"...;;' ,'•-,.-:,:..".:'•-•••,-4,:---::-,..- -.•. :-:',:-:.•..-4 .t.,„i•.•:',,,.'-t::--;";:,- ,•'.;:';'•-•
-.!--......,,,•-.•!...,•-..-•-•.%•..,..,..,.•„...,•:,..t.,,,-.---.-;•;-;•,,,•.; •.f.••;,';'''.i."-‘,". .•.-•';,::„-J-,-.:,;,:.-.,...,.;,,,......,.....;:,•-:.•'-;,•.-.,•;;•;";-;"---;•.;,!-.7.-:'•:•,....7.:7'.17:',..!;:*"..,!.., ;:•.. ,.•..1,•:•, -,--..11:1,11'('''1.4,;.t.',..„,'";••,,, 4 .4•,,„-..;.',,,,",;...:••-•,'„':,-',„.".
_ .-,.,-..-•, -•,:..•....•,.,.•,•.•.• ,2.-,..•.:„.,„..- .„..,....,,,,...!.,....:•..-.,:,,-.....•-•,....-.•.--„•---.•-,•;,•"......,.-•..;,••. '.,-...:::....., .-.-.--_,...!:,••----,••••,•••.•••!..'••••••.---..!,..,.%.r.,-=•.":N. 1,-"'-'-•- ',,•••-"-:. ..--'- '-72,0"-.-•-•'•:.•
. . „
r
''-''' ' .% .:..-•'-:.:2..".:',
i•ne--- ,,..,-',:-:,..'',-;
••".•-• '' -,u,k;,..,....`.•' .-1,-,=.1..:--•--•-••.•.-..•.."-•-,.•-:,,•:-..!..;.•,."....7:,:!.. .:-.•.-.,.-.:-.:...,-iy.-.......4.,.....,.,:•-•,•,;•••••••.•.••.-•-!--:,•,--;,:.•;;;',,,,,,•-. ;.. .. '..-,....„....,,,•.,,, II;-,,-,, . ;:;,i„7,11 ,..;.:1,-;,..,..
440`,47,144te04,,!'::•':::::,77.11;4_V;•-.:i-.•:;,-.. rr..,...r;•:,,e.-..c......-.1.7.-..',... ....:;.%,...:;:,...7 -.7-'.!,.,-!!':;r::;..7-r,r,.,!,,,:r.,;i.srr,r;.•.,-::•,..,..,•.•.--, -•-•:r-r•,-,-;.•::•,:'•.;•,.7 i ' 4';', D ...z:.'i••••--- •:::•.:;!:.-.•....!,"., C,.t.. t."'`'...4(' 1/0"•::•:-:.!•:!':!-:'''!---,---•--•”---"!•-•--•! -.=-,-.-='-.7--"=.''''''••-•''-'•-----•,:-.... ....... ........-........-. ,,..,..,.•.• --•..t•-..- -........ -.•-.'. . ..• - 7."--, "'"*--"'"3.''''''-3S, -".--•''r••••-'
r:41.a.ctii.i:,,,,,,,•::-.,i,?:, :-,-.2,-;,,,,,--..-...,--:-.;-:.=':;:sii:::::',''''''',',".7".1.7;;'•"•-••,..•'4';',''''. ., ''',.'•••••'.'%!..f.';.:,•':,,%7';••:::::•••••••••:.',';.*..";1`:.%,--...%•,••:.•• '•„ ""Li c)t,''",.t.#c;iii.-tti:VP'.....7r-,•":••:.::4.'73,..:-:-..-';'...-tv,'...!7.:,?:'4•`::,fr.L:ct7-&,•lic:-..,:"...-,!',:7;..7.:.',":;-,-;!:-..7,.;!:':'-',•.'•.,.:!..:!'.•'''.:'.. !;!:',..::•.'i!:::.',`,".7,':."f;',. .--7.:•''....r.',: ":.`...c ,4, !c--.1 "K--.4,'' ..•:!. k-'ii ' -•.4 -_,1-
p.,„4eit,....„.g.),,rwi'...:.-.:.;',...;,:f.Nyff...-s..;:".,:ii.;..;-.-...:z.v,.6-4.n,i,;Axi,oki-'.:i:...,-„•„-;!•,7..,,s,•,.',-.7.", :-..:•.:.,.:,•,...':',,.:.••••;-;•.,.•,•,-;•;•,;•;',.".".t-,,,,!,;!!!..!;t:.•:,'./.",..'•:;1'''".•••,..f.,,,,/,,,,,""II !' !I....s.!,_,' '....., P-.*::-..!'
r.....,•••0•1._,S1:!,;i8Not:.,..,,' .'A,. ,.%."..'''.:'...!;•:;''.;:-:1:''=•.i._;.-..'4',,i475#•,,5%••4•54'.4";'.'1.::;''.44' 'V"';'•:''''-'i,"...ir:''::::"!'•:''';:•!i."!.",:.-",...":;'%""..,:::::fi.t.-"...":!,"';'2,7,,,',:.!,..t‘:', ,' ,-",•,"."tT'',,,••--:;,....„'+' " 4 17,j;:,..,ii,,,,a.:-.,A,,ir1/41;'',',,,
tfi-.e....i,, ,..iet v cw. ''.,,,L,'..;.,,,-",,,,1,:,4-4.5.Wrf;uft.41,,,...5„4,..r.,tit"t4r‘ ....;‘,,41, .. ;,...',.•.•',;,...:,,,,i,,-;:.,„,-,-1.-,,,..,,,,i,%?.;;:t".,,!,;;,..!,:.:',%:',;:•-v:.,!-.72-::"' ,,,,,:;,, -.-:2..,';-7, „2., ,,,,.. 1,:„-Q,,,,,:.;.,•:,.:.;,,;•,.:::::si„,...,..J.:.•-:-.,-., .
.t.....p.'-c.J. :•rznizowviw . -, 4if:441:1,R'::C•'• " ' ''•.f...,,,•,,,,"V;;I•jt.);,.•,,...•:. •;..:,".,,....7 ,.,.;;... ..,..,-.;.,•.::.• ,•:-:•'2"...;:!,';' ,;:•,:..!.,;'!:: ' , ,,,,,:;.,?:',' --a' .'3P ,.17„,:41-.4._„: "::,:::1,k;:::•: •:,:,i ,,'•:,'.•'11:::.:,*„..i-71:.
1...,,,,,, . t.,,,,,c,,, 4•,,,, .. ,, ,,...,,,,,.. .
44411.1 . -.^4.-C:fa.,ilit.",ft:LS• .......,-• . -.. • . 0 . .. • • , ) ,.: '...:', ;.7:1'-'f.;!;•..t.'t•••,!;•i ' ., • , .,,i!,,,,,,,,..--------••••• Th,;..,,,,:-:-,..,::::,:i..:;;;,,•],-;;; ::.::::1:::••?..1
t'•; .,,:*:,•51.105-5,):4,-,eraki ,e_.;,;i:•.,,:. },.,.1.''. - ' ..,.0....'1'h..„.14,_'•,".',V,•:7'.%;7:::•';:...:".-;4:`••:-•':.•:';',•..•.,-, . '.-1••,' 'lilt'); A.,,,,-5,1,-..;?::,1,,:::::,,,,;:,,,,.,,,::),
0.. c.A.-4,. .4%-' -•A-.7:.-:‘..x.,—wok: . '',-,4445.:.-----,-;;,7''.!'; `...!:t.,*_..-t,!,,,':.7,,,,,,'*;,';.,;.':*;,-•:'4-,-;_=7:4:.:,,,,',;7,/,'-'-t `tt ,‘<?1 c.ttt.,;'.?-,,:;7,-,,,?,-2tc,?.:7,t,'.,".*:.;-,',..,..t-•,-
IL '''Z`.4,11.0' ,r,•'''''' ."'' .'. .. - •l'• . \''';'' "'("431. S,,;.' "-••' '". 4,,,..'•^“•,• •-.•,•t, .!01111691111121111.1A .\''>,,) 1,:,::,..,,:.4i•.:::.,:,:t.....',,,:.,:,',,e,.;'•s.
. cot 1/4. 4 r,,tts,.....-,,, ,:•:..t.„..,..,,,,-...„::,,t,,,:....,-;,t,..!,,,,,,,,,,i.,,,,,
.
xx 1:4..i" ,„•4174,i,,1 , f,,i; '; , ', •,tv4 CdP•ti166.,. -,t,..........,-••.t;..,:-.,...wa.,,..• , '\ : ', IL:
MI, ...a.,. V.'. :baz,..cr ,_„,_.„,..,„. .. ,..,, . .,\ illimp,,,,... ..., ,..c.c7v;),.. , : .....,..,... :,.t., :. .,. ,4,,.., ,,,,,. . ,.. ,,..;•,,,:,:.:,,,...<7;,...,,,,,,....,..-c.,-;74-. ,....,, „v:,,, ...,e.,...-,,,,,,„,
_ ,,,,.. ..,,..„)„.4),?,.ey,..,,--t••,.' -'•''.?..-.,'.7.--6..,42.i. --70c101,-.1.;..' • li• '-'-. .-.'.,...•,!,';•,-..%•••;.,!:'•!.-rii;".•.•.•N.smenommi -\ ,,„..,5.:-.4.‘:-.,:;.,,,b.;,-_,,;.,,,;„:: :::,f-:,:4,-,
• Jr 4.-e--'44.,%! ' "r".0 i'-• c,:• •trAt,t,,. " -•-•-••17111,••,41.•••• •'•-.•-•';';/.r.:•.;•-• • •,..,,;‘,.1191111t5111.110111 ,,7,45,../..„.:t g..::
=l' '' ,:64::•,:s....1....t"...,.' . "-"""''' • t,..-:`•..4"... .,.:• rook.• :-•... e.k...•,. • •...•4,:,-• • •,/•-,..•45'.- . ,..IIIIIIIIIIIIIL 0''-',i`-';'...e.---,,4;:=4,;_‘-',-'-:'..:1 ';,:.::::-...,:,:.,::;;;;•.,,y.
.• ,dt--..-u-vt--,...t. - i ' ' ,I,....w, ..(„dk--, pi,. • • .1- ---.-... .r....... •. .,,i,,. • • ••,-,-‘-.-•. . . .1.:.,..mom, , ...,,,--:', ::,...:t-J-.:::;T;;,1:-:i,-::: ‘,,:it:,:::,•,:ti,==,= t..5.v.....1.. . kr: c..., w-"S. -,X.:,,._ ..;;;.z.2:•-....,•icirix'..;•-.,•.N . • • •.•. .. , . ;• -•,.-.•!: -:-,...,..,-•.--Y.`..,:w-'•:•," -;•--'41:'-:•",":-.•
.. (......., 0.. x x...„„x x x x . • .. •. .:•••.. .. .,"••••....Aczal.,.._ -4.,.._::---...iv.,,A.mr:...•.•.•.•. . .,„,••-__---- ..,,,„ ,,,•-",-:.;.;.!..,....•...-.,--,.,,•,,..,,„,,-„...,.,....„,,,,:,„;,,,t.„,
=,'="."-•-• „. . - - • x x r x.•x x x x -'•= r----. -!",:A..-..:••;;;;.1-:',.......::.11::: .',.::.-,-..,..!....,;-:„„,-.;;.!-,!
. ..,..,!...-...;-.•:•'xxxxx - - x
...., -,....,„, . •41.0,‘..igri joA mod,pii x X:3x x x x x x x x x X x x - ... !:...."1"71....,.. .. - 'EURINIMMIlilih' i .--..-:,:,...-,..,:,.. ...,:-.4,-,,,,,•:.,,,....f.,,,:tt,t..,t7.t.
---;•;:',,,,,1".,',,,q?:.'/..:..,-,:,,-..,:t:::!'::•;-:.,-;,*K•-'-...:" .!:'';:.5:::.'t?.•:',1.;#*;:f..;;;'::,:,:,:'.?-:':•:,.,"1%.:*t;',1
x x x /X 7 -, ,:,:••,'...,..r''••••;.,.:'!-';'..'s:'.7•:,;‘:':":•,:;';':;// ,
'•-•"'•:::' :7 - .. , .'7',. ';':•'..•`.'•••,.:',',/::„.1::" .:,::::"P'''''',,.-.:;'-/ .'-'
-‘i''‘ (,Ali...t•WalrAti N...1 X X• X X,-,X.,X X .X X X X
--.1'.4s,,,A.Ntt.4a,.b.• .‘'..-a-2-'-'1,,IRAP;k1NaTbhix-161:tik-v-1,•,-it _ , , ..::::: ,_-_, ., •f'''-'-',..'-'.'-:.:..77 `a2"..-^....--',.. •.--•••,."--sa
.(' t . il 1•Z; ---!"j",. l';`,..
\V-'" 't 4,1" •••'''' ...---"‘k, k k x•,,,,... ..._w x x x x. 1
\ S\•,ttZ;c:tkil... . '' .' • i''(-^', i
, :,`..Cr • • •i ' 'X X X X
X X x -X. xtt-i\AFPOSppl, ,'. .t, ,,,t,..;;t:::, , ? P•7,,,,V7 .41,,'
I ---" „,./,',•;"‘
, •.,,,,1°'.-..Ittig:tt -.'x x x x x. x 1...,x, x x_xx x x ;
xskx\xx xxx. Ab. ,(`
*4.1,;:7TF:,,,..,..':-.4.41X:i
.f•. .."-4;3•1 •..4, _X x-2 i....,e, x,, x• X X X x X
.
t4.7";,.6114tik:ITII..tete41`7, 4"tX%1 6
- ,., • ,1j IZ't -I-'rI
,,,,,,,.."----:,5-4;l'I- Ii 1 I'.. t'„11 I.-—0
Ili:.00I'ririt),d'Acill,..API#,:e,Wlx x x X'x . x X xN,A,X x x x X '
X X!X ,Y,,'''.'III,i1,0._ x X x X x X x "I-.;If I-;I:rr"II-..I. '-.-37i
1.1 1 \j-:,,,y4hAfti_•.•...Zig:77 .-.e,•,,.V'''''..,,,,x'reAMETIFIC,P._5._ .X x)C.x X x'' ej e r,-T1 L,s,‘
IX .._,..:;,:..-'-,,,,-,,:,:r-.---i.:;:Z-:::.'Zili.ittli:S::.:;•••iii§ii,q '',,;:-. .i'',., : ,„._ ,.„.,. i ,.
,.„..,..•_-.•.••.. i 30 ,.*. 1•••$.17,F,,,,,;:, ....f.,,t,..,-Azia....:,..-,-,.• ',,:.:',...",,,... .t. x x 2 --..-.--,...-4.
a "Z.‘,1 1:„.•-•:".",,,,,,,‘", •4,..,._____A.,,,,':'..f.0'.;.'.."!',..1.'1.,,,r1ti,,,,”2%1 :.•39 4.X.r..VU.„,'':,...t.r....,•, . •s,.,...G,....,,,, opt t
..._,..,_,-,,,,,.......,--......:;,:.,..k::::::::::.....)..:.,y,t:::.*:.:::.::::•.,:.•:,;•?_:,5_•*„-",41f,J`k---..„.„‘"It,\
\i\-17--- - v.. :- 4.0,•,r.,:•,.,..", „*..k:'. -:.,,,.. 414•tt.r.' •(,..,,......---- ----,-...... -e.....,....„.„,......4,„.................„,_...........7„:„.„„,,,,, .,.... ,..,,,,,,_„
„,,
......-.,,,,..,
i
. ..: `'...,:'.',-...f.:-.:••,...„-;,....4,-.30,„„M-$13,0•: : „,;:".,:•Xebtt,-"cri..., ::•.:.::::::::;:::::::.::::::::::;;;:.;:*::::::.:,.??? -1,,.,', ) *.:•;,.. •:•-‘..!..,......„...t;„„_,,..,..:-.-,...- ,
, 411;$\\--•4...„;:zt:..,•:..,,,,.„,.‘,..tioq., .. ...."*.x...A.,.:47„,,,,.....•a..,-,---..‘__-----%,,:„.....‘,„,............................, I, ,,,,, ,. ; ___:;_,,,,..,......_„.„,,,,,,-„,,t„ ,i .....„,.............. !-'' '..,•,•:e"+c•,---... ....x.:.:.:.:...................,.v......., t„, ,,,, ._,.,
\2*. /.1 ICP...<:7---=':.'";',r.:...e...ii:g:i4'"------ MN•..60:, '''!:-....''''''''-'------------.:.•:..'•:::•:•,:•:•:•::::::::::::::.:::eg..;7:;:::,,_2,:,,7-„,,,,::::-.,:::..,,-;;;g;;,..,,,,,f_.„,„....:2:.,:-„,i,,,,,:,4,, ii ..i, ,.,_,;
r'''—..c.2:.f..:?r9:.•:°:--- 121;.'''''''''''''' ' ' "77777-.777:77"5-:t-",:::•7":'"*.:;:::::'::;:---;1?--ill-7..- '6../2.4e1Ntll'-'•:ir:;::1.,;11.\,1,., _'s'.1a\,),
,,,--4:„.„1:Y\=,,„.=,.-...:.-....:•.:frifi:::::./:—..._.___74—_,,...,,,,,:....1c't7.:::::..„ '1:::5----:'''' :''-:-'':''''''--."---- ',,. ', t;::.:::::iiiiiiiiiii:.:::.:::.:,:4:„.!,,,,,,,,,,,.4,,,,,,i'',;‘,,.C.-4,4*.,/,.,(''',4i,,t......))11-al,f,:....!!fit411,;'-',.,,0 2.''''
ri801 '
kz,k,„..)1 .i:P*-- ‘i'-'441:41::::.:.•',7:,?-1','...,..=-......;.•: ••'''r": ;:::::*:::,§:::•:::::::::;:z.,,,0,1 ,,i\.2`,Tv. ,‘F---;iff,-qx -I,,,-""'''':!':'..;5-*:.:4,•.•:•:,..*:•!•,•„;-;--:',4;r;.,.'.11,,,,1•.,:',1;!,, . --.-,-- - - ..x....4.%,rr.r-fe,,,,,vl,t,,, 1 1 X.,z111,.- ,,_______,*.5-1;‘,,=-ck'tV,W1,-4.7. -t,',%.,:::.•x_:_x___,,...-t-icl-, ,,,--:,,,,,,, _
rl'e5.47.-61:.41i...4•''',' ..i.:..,,s
---, + T"'''''"..''''Z'3,,,,,10:',., „..1,,,,,,,'...,,t°''';'-';';:•''''''''''''3X X x CIUM...,043-:.,X;24,..3.,,..X4Ixi„,;) '4* *i., '4; '11 (111.;-'
•;", '''''3,,,ca,"„......,,,''',,,:3,'i''x\%8 pt. X- X.,,le--X .X....--417,'Zi.- .,:!,,,,..;,,r5... „.„,,,2,49..:31ti \\,\,,,,\‘‘,„,t. ., ,.., ..1.,
xl x rx,'x- x ''''4, x x,,,r,,,i ' ...?..1:Pg.....4'1474':12:41".,;)
i ,x x x X'• ,x t,x,,,,,iix;. ,13,;0• gt .1,41-.1':d' \ :\\:.I 1)
,.t
elm- x‘rt xf x t 71 x x x k 1?.53'.1)54:•:-.: .3 14: .03 ..c,:koid
-i /70,-.0A,7-, s';''.,,f;•'' 111111160M,i x ii * x I x x x x .1,-314..1,.*-% '11'.,...•::',017.11. i:!x&N
';::'1+15:0::re..• if In y '\. 1\\i :i'("1- ',//\
:11116'jks° etopeT•tyS:1 V\v,,,,. , n 7 ,,-"I,v '..% °
.,,,,,:, i;i 2,.',,,,,,,,,,,,, ,1 IIIMMINIII•x1201 110'4v-I -,,,--A:47;,„,,,,,___,,,,(1 .,„,_._,,,
- '''1'5:';‘,;',1',4: '''' ''.'r. SMIllagiC•1C x 4 r7;-7,--.--, „,IkEi,i,_4,$4,...ivac,,,,Ffr-ivy.53x,f,,,4-4,;:vpiotp?..A,T;;0:g•A 4.1 ‘ 2,-.'!'il 2",q,"m/A-10.1'
, 7;;;:).A`s\':'.1 efil‘i ":"' INIIIMININE x tx:I x 1 x x x x )4 Ar.,.,,,,,-4*.7 )%44,;),..1 ....4.,A'icifir..2:6614,4.3i,Z):•,),;144,26,6,;.:,• d'e•e-t1,.1. .,,
,./---,,,,,,,k 1:A v ,Nromiemin:x„x i 'cIV..`-14 f x k I,- x ,(••,-•,*rk:ii...0.-ir..,,IP-4^4A2ti.„9,...,.,1,-,.....,,,,iiwli....J.N.1......-,77.'•...,..wklf,,,,,,.3.,,,N,,,,, ig,,,,•,,-.\.10 ,/,,, p!.,,..,t„,
--4f v,,...1! Iii? 1,,• MINN .-,,,..L.,ori0-)e,,lc x' x x '..x.„,x....:,-..ere...,:ev.)r.!,p••:•?•):::.14..Q3,,91.•,..".....?..,,fiTY,cre4*%..,-4:'Irk::7;g:a.1... ''''').4‘ Ii(t, \III; , -tr.
_ !I, ' !! il,, .5!?-,:=2.;1,awls-•--,—, ,iis-pe-.ix i x x x :,i-x-x;if-0._•4., 71,e6;.1,...1.;0',..,-,n;:z,41-4,11,7,,-,-(s.v.14,-,:,tol,.;...1„:3,.,11,,,--; .4 1, iit• .1
' ('24'10 ' ,.,..•::::,,,1,,,,,,t,'INMEIN '1;X XIII it3i.?!il k k k '5„:::!°'''"''.,.!.•• '..;•,!;:4).,,-.'1.4'.4-','11,,..-;$:4.,!..•.N.,:!•74*/.'•vol:a."ArtWe-1,-t;'''.4.E•4‘4 ••• •,. ,, ,-.7,,-if ....,..,(1f, 0 z,..,,'„,..,
IN...„..._ ,, Emma•Lix„ il,, ii--,-5,i x I fia.iik x ;%C",ii 1,-'2 NIP., • i..'3."00,allf.%1:rt3,11.34,04...1,.. ...7.1 ,4,171.K,....'s,".../r."!..7‘. '\'''',,,.','3)1 k.V,;// 4/. 1 ,:',..,
1 ••..,_.- .
l'C.3 i'l'HI ‘*"''''''''''.'''''' ‘3•43.:%*:.:<4.247•LI x x-- ,,,11'''''Jir",,,",),x x x x x x,'t x:::x1,-,- '''.';''c ''',.:•24. .C.:1...,..4.;,-....--.A,..1,P24";;,''''.1.:?".•.....1'1.,"1;''''.'N-1.44'-..4tri-•:'•--;...1'4).54-/'• ••f:',..4:-,,,--"1-:1'14...,. '''''''''s''' * 1-*-14 i.2"1-•,-A * '-',...
R.'"'';11--,-,——‘,, ••--i":+"•••••• --—'-1,—*.—x-rx---7---X:7'3C'`)ejX"Ig-a'4,',F.A. '- it-/Y..??.?f.i.••9,17.V.7,••••‘,-Oe-,.....•••••••',..•'...•'•-:477'''''''''''•••• . ',.. '''..-''''...4*-77
1 1<1*qe..1 rl.e.' ' ' ',''.:.:4°:.:.:1;'A "';'.444'-x'-x._x..;,,,,,,i...,..x,..,0.... 1,1.--P-5•-!-,..f.e:c'•,,,,„....10'..: ,....,7-1-•7,'-‘• .7'.'77-77,7.71c.'••,11 1 -,..„117,;)
11 0 Di 1 --.'.•.c.''1.2' ' 11::::::::..4:1:1 X,,'•-•,?.‘,1,41.1x4.'2 t;k., x-x-xe ,I_cc,'-x.-",.-:;',2,..."•;•''' .;•;:',„..%!%.,_?).7.1%. 17.cfr Ail-.7-:""•ii.:,:•:-,-.,,-,::."...-,..'?-,.,!,-,.-.-:•,...:•-::''.::-,..:...:/: ,-.rcI\ ( , - ,- 4,...''', T.4.,..,„..., ..,‘ . „.s.,,,;24,,x1x. x 1 Fte I•x--,--....3e--At.....1t..-...15„*.x- 'it 1 iy..,•,`,"..g,•:..r15,7(1,rt. ::475,.akig.n.i.ez.,.:.;If;...., .'.:_,. ,•.,.,:.:: -,..1•;-.i...
,! i .4t.::,,,x;.:,0 x i 14, x x x x x xi....x.,.x .., 0,,.,....,...:...., ,i,;:,-4.,,ft,t:.. .,h.",..•......1......,:„.','„.,....,,.,.•,.•::,„, ,..
13, ,k I
x x;t1•21_,--?C JL"5- '5-15- ,c.,g.,,,_,,,„2,„.7m,.,,...-,:fiqe.s..0 ......;,-,1-17.4e.-.-Re8apemr-:::........:;...-.4 .-: A \ VA, 1;-1,-------,---...,
t•Atilat.--.x•--Yit'S, . ..,:,..,,::„:„....?•,.....:...,,,,,,-,,,••••.:•,.• i•,,,. • \ li Ni
. ....... ....t.A
•' 1 %.••••• • ... SINGLE FAMILY RESIDENTIAL. . . . . . OFFICE
• • • • • •
•
•..•••••.••.•••.
:•:.f.:::::::•:-.".•:-... MULTI-FAMILY RESIDENTIAL --
_WAREHOUSE-INDUSTRIAL
121: T R A N S I T I 0 N A L .:..,..•, --i ...--'4 QUASI-PUBLIC
.,:,,'...'..;..-....I.L..-j
' iiimmanii x x x :
INNEIONNE COMMERCIAL x x x x x x x x: RECREATION
AN:rni'''•.'..J UNDEVELOPED _____._ --=, MINING. AND QUARRY
• ,•„•_.tits sly,
.t. t.
0 1000 2000 B EXISTING LAND USE
m BLACK RIVER
limmaamiti• i
BASE OFFICE PARK .
U.S.G.S. _ . _
NORTH R. W. THORPE & ASSOCIATES
__ _
•
76
Mitigating Measures
An alternative development design with limited building area could
retain significant areas of the site in open space.
Unavoidable Adverse Impacts
a) Alternative land uses for the site would be precluded during the
life of the buildings.
b) The natural riparian forest existing on the site would be replaced
with warehouse/office uses.
9. Natural Resources
Existing Conditions
The vegetation on the site and its open space characteristic are both
natural resources.
Impacts
The proposed development will alter the majority of the existing open
space and cause the removal of most of the existing vegetation on the
site.
Construction of the buildings and roads will consume natural
resources, including energy and raw materials used in concrete, steel ,
aluminum, glass, copper and other materials of varying scarcity.
Building operation will require cosumption of energy in the form of
electricity and natural gas. Gasoline and diesel fuels will be
expended by employee and service vehicles of the industrial park.
Mitigating Measures
Building elements could be analyzed for use of techniques, wherever
possible, permitting recovery of materials used in construction.
Unavoidable Adverse Impacts
a) Consumption of building materials and energy.
b) Conversion of natural open space to warehousing and office use
with removal of vegetation.
77
10. Risk of Explosion or Hazardous Emission
Existing Conditions
The land is currently undeveloped and heavily vegetated with trees,
shrubs, grasses, and weeds. There is currently no risk of explosion
or hazardous emission. The adjacent rail operations present a slight
risk. However, stringent, federal safety and packing regulations
reduce this risk to a minimum. There are no railroad-related
accidents on record in the area, and the risk is no greater at this
site than at any other site elsewhere in the country located adjacent
to a railroad.
The general vicinity was once mined for coal . Remnant tunnels from
previous coal mining activity containing hazardous gasses may exist in
the surrounding area. However, a U.S. Geological Survey, Preliminary
Geologic Map and Brief Description of the Coal Fields of King County,
Washington: in 1945, by W.C. Warrren, H. Norbisrath, R.M. Grivetti and
S.P. Brown, shows no past mining activity on the subject site.
Impacts
There will be a slight risk of hazardous emission or explosion during
construction. However, risks should be no greater than for any
similar development. It is possible that future tenants may introduce
hazardous substances onto the site.
Mitigating Measures
None.
Unavoidable Adverse Impacts
Project development would result in increased risk of explosion or
hazardous emission.
III. ELEMENTS OF THE SOCIAL ENVIRONMENT
1. Population and Housing
Existing Conditions
The Puget Sound Council of Governments (PSCOG) maintains updated
projections according to activity allocation model (AAM) districts
78 1
comprising one or more census tracts. The proposed project area is
located within Census Tract 259 which, in this case, corresponds
directly with the boundaries for AAM 3800. The population projections
and household data shown in Table 10 compare characteristics of Census
Tract 259, King County and the cities of Renton and Tukwila.
TABLE 9
POPULATION AND HOUSEHOLD CHARACTERISTICS AND TRENDS
Census Tract
Study Areas 259 Renton Tukwila King County
Population:
1970 306 25,828 3,509 1,156,633
1978 268 29,300 3,160 1,164,397
1980* 410 29,885 NA 1,264,991**
1990* 634 NA NA 1,399,700
Households:
Estimated Total
Housing Units-1978 144 11,691# 1,693# 485,651
Average Household
Size-1978 1.89 NA NA 2.42 (�
* Population Projections provided by PSCOG Research Analyst, Jan Pilskog.
** Source: 1980 Population and Housing Preliminary Report, ,FHC 80-P-49, January
1981.
# From the Washington State Office of Financial Management, Population
Enrollment and Economic Studies Division, "Population Trends, 1978." -�
Impacts
The office park development is not anticipated to produce a j
significant increase in the area's population. However, it may be
expected that the estimated 4,105 employment opportunities generated
by the proposal may prompt some non-local employees to relocate near
the site. In the event this occurs, a minimal increase in the demand
for local housing would result.
Mitigating Measures
None.
Unavoidable Adverse Impacts
Very slight increase in housing demand.
79
2. Employment
Existing Conditions
The site presently does not generate employment.
Impacts (Short-term)
Construction of the proposed project will provide short-term
employment, but the number of employment opportunities will depend on
the season, individual deadlines, and the size and number of buildings
being constructed at one given time. However, it is estimated that
the maximum number of construction personnel on the site at one time
would number 30 to 40 and most likely be comprised on local
population.
The hiring of the construction work force will draw from the city's
pool 1 of unemployed, to some degree; however, construction
contractors tyically retain a large portion of their own work force
which may preclude the need to rely on such additional personnel .
Mitigating Measures
None.
Unavoidable Adverse Impacts
None.
Impacts (Long-term)
The project, when completed, is estimated to attract a maximum of
approximately 4,105 permanent employees. (Sources : Puget Sound
Council of Governments, "Land Use Inventory 1961 and 1965," and verbal
confirmation from Don Pethic (PSCOG) and Dave Markley (TRANSPO) .
Thus, the project will create a need for roughly 4,105 skilled and
semi-skilled workers, which representsabout 7.0% of the project 1990
work force of Renton. Some of these positions will be filled by the
unemployed Renton work force; however, the majority will be
transferred from tenants' and users' alternate sires and filled by new
personnel who live outside the community. It is estimated that at
80
least 5% or 205 employees would occupy the site at any given time of
the day or night.
It is reasonable to assume that most of the permanent employees would ,
reside within a 20 to 30 minute commute of the site, but it is
difficult to specify precisely where the new residents would locate.
Mitigating Measures
None.
Unavoidable Adverse Impacts
None.
3. Transportation/Circulation
Vehicular Transportation Generated (Refer to Figures 2 and 3, pp.
xii and xiii)
A prelimiriary analysis of traffic impacts and mitigations associated
with the proposed action was conducted by the TRANSPO Group which
forms the basis for this discussion below.. The consultant's letter
has been included in Appendix D beginning on page D-7.
The Black River Office Park is proposed to be constructed in two
phases. Access to Phase 1, the eastern half of the site, will be
provided by a single road which will connect to the road system
proposed to serve the Earlington Park development adjacent to the
south. Phase 2, on the western portion of the site, will connect
with the Phase 1 circulation system. In addition, a bridge span.-
fling the proposed P-1 Charnel would be constructed to provide r
access to Monster Road. According to project engineer, Dana •
Mower of Triad Associates, construction of this western access
bridge is not anticipated to involve any site distance or grading
problems.
During construction of Phase 1, an alternative access route for
emergency aid vehicles would not be available. This impact could
be mitigated as outlined in the section on "Mitigating Measures"
below.
81
Trip generation estimates were made using a range of assumptions re-
garding building design and function (e.g. , one-story or two-story of-
fice buildings; office park or general office development, etc..) . The
Institute of Transportation Engineers Trip Generation Manual, 1979 and
Arizona DOT Trip Generation Intensity Factors Manual, 1980, were the
sources of trip generation rate information. Applying these trip gen-
eration rates, we found that this development could generate between
9,070 and 34,030 vehicles per day (vpd) . The evening peak hour for
the warehousing generally is slightly before the traditional 4:30 to
5:30 p.m. evening peak hour. During this 4:30 to 5:30 p.m. time per-
iod, the combination of office and warehouse uses are expected to gen-
erate between 1,250 and 3,970 vehicles per hour (vph) .
When these volumes are assigned to the road system, several dominant
T atterns. are forecasted. to e,p emerge. During Phase I development, all
traffic will flow through the Earlington Park development. This ad-
ditional volume will add traffic and increase congestion at most of
the major intersections-along Rainier Avenue and Grady Way. When the
road adjacent to the west side of Earlington Park is developed, a sub-
stantial volume of traffic, especially truck traffic, will shift away
from Rainier Avenue to access I-405 at Interurban Boulevard via Grady
Way. Even following development of Phase 2 and the accompanying road
connection to Monster Road, congestion along Grady Way, Rainier Avenue,
and their intersection with 7th Street, Powell Avenue, and Lind Avenue
will tend to discourage people from driving these routes and will re-
_ salt in a shift of a noticeable portion of traffic onto Monster Road.
While mucdh of the automobile traffic is expected to travel to and from
the north via Sunset Boulevard, there will be a substantial attraction
to and from the south to I-405 via Grady Way and Interurban Avenue.
Because many of these intersections currently operate at capacity and
because relatively little can be done to increase the capacity of these
intersections and/or freeway, there will be several impacts associated
with this or any new development in Renton:
• People will seek alternative routes to avoid congestion.
• Capacity conditions at key locations will extend over longer
periods of time such that hour-long capacity conditions
today may extend for more than one hour in the future
• Some people may shift their mode of travel to transit or may
choose to carpool, vanpool, or fleet ride to and from
work.
81a
Mitigating Measures
a) To reduce potential safety hazard, Monster Road should be
upgraded to accommodate heavy trucks and increased traffic
volumes. This may involve recharnmeli7ition and possible
signali7ation of the Sunset Boulevard/Monster Road inter-
section.
b) To discourage the use of single occupant vehicles, the City
may consider limiting the number of required parking spaces
to less than is currently prescribed by the zoning code.
c) The road proposed to be constructed along the west edge of
Earlington Park, to the south of the site, could be extended
in such away to provide westerly access £LQUI the Black River
Office Park, in order to reduce traffic volumes that flaw
through Earlington Park.
d) Establish a new bus route or modify an existing bus route to
pass through the project.
e) If bus service is modified to be convenient, provide bus
passes as a company or office park benefit. l
f) Office park management should advise tenants and their -'
employees of the advantages of fleet ride, vanpool and car-
pool programs through a package of information provided at + '
initial occupancy for each tenant and coordinated through the
Seattle-King County Commuter Pool agency. Office park manage-
ment should also schedule public information meetings for
employers and employees.
g) As much as practical, office park management should encourage
employers to initiate a flextime work schedule so peak period
traffic can be distributed more evenly over the 3:30 to 5:30
p.m. peak period.
h) Any roadwork on-site could be conditioned to allow open at all
timac a portion of the road wide enough to permit emergency
vehicle access.
i) Grade an alignment from Thomas Avenue S.W. which would intersect
the road system on-site with a gravel sub base wide enough to
allow emergency vehicle access.
j). Disruption of traffic flaw in the internal road system could be
minimized by installing utilities, within the right-of-way, but
outside the roadway proper.
82 •
4. Public Services
A. Fire Services
Existing Conditions
Fire protection to the proposed development will be provided by the
Renton Fire Department. All calls to the site will be handled from
the main station located at 235 Mill Avenue South.
The station has ,a full complement of pumpers, ladder trucks, and air
vehicles, with full-time personnel on duty 24 hours per day. The
maximum emergency response time would be four minutes.
Fire flow near the site is as follows: 4,198 gallons per minute (gpm)
at Monster Road and S.W. 7th Avenue if extended, and 6,200 gpm near
Thomas and 7th. (Source: Earlington Park DEIS.)
Emergency medical aid will be provided by an aid car and two personnel
from the Main Station 11 with an average four-minute response time.
Impacts
The nature of the proposal has been reviewed by the Fire Marshall in
relation to its impact on fire protection services provided by the
Renton Fire Department. His response letter has been included in this
document in Appendix D, p. D-5. The Department is presently operating
at or near capacity and response demand is increasing at a rate of 25%
per year. Also, average response time, as measured in 1979, exceeds
by one minute the minimum standard suggested in the Renton Fire
Department Master Plan. He has concluded that "further development in
this area should be limited until such time as improvements can be
made to provide timely first response capabilities."
Mitigating Measures
a) Sprinkler systems installed in buildings per City code and Fire
Marshall 's requirements will reduce the amount of fire flow
required.
b) Non-combustible building materials will reduce risks of fire.
83
c) Industrial tenants could be limited to uses that do not utilize
any flamable materials.
Il
Unavoidable Adverse Impacts
Increased demand for fire service will result from development of the I
proposal .
B. Police Services
, i
Existing Conditions
Police protection would be provided by the City of Renton Police
Department. The ratio of police personnel to citizens is 1.7 per
1,000 inhabitants which is below the national average of 2.3 officers _
per 1,000 persons.
Personnel in vehicle patrols and at the central station at the -�
Municipal Building would service the site. The maximum emergency
response time to the proposed site would be three minutes.
Impacts
The Renton Police Department has the capacity to provide adequate
service. However, this development coupled with other proposed
developments will require additional personnel . The increase in tax
revenue contributed by this development could help negate this impact.
When site plan details are more clearly defined by the future tenants,
more detailed impacts will be assessed.
(Source: Letter written November 12, 1979 by Hugh R. Darby, Chief of '
Police for the City of Renton, Earlington Park Draft EIS).
Mitigating Measures
a) Tax revenues generated from the development will help offset the
cost of additional service.
b) Internal security systems could be installed in the building.
r,
84
c) Exterior lighting should be placed at strategic locations to
provide additional security measures.
Unavoidable Adverse Impacts
None.
C. Hospital Facilities
Existing Conditions
The nearest hospital serving the proposed development would be the
Valley General Hospital which is located 2-1/2 miles south of the
site. The hospital at present has 254 beds. Although the hospital
presently operates at a 76 percent annual capacity, it often operates
at 90 to 100 percent capacity on weekdays. Optimum use of the
hospital facilities has been determined to be operable at 80 percent
of capacity..
(Source: Telephone Conversation with Bill Murray, Hospital
Administrator, on October 6, 1980).
Impacts
Impacts on the Valley General Hospital cannot be quantified at this
time. However, with the increased automobile traffic generated by the
project and the potential of industrial related accidents, hospital
usage may experience a slight increase.
Mitigating Measures
On-site first aid facilities within major buildings should be
provided.
Unavoidable Adverse Impacts
Slight increase in hospital use.
D. Parks and Recreation
Existing Conditions
The site is not presently used nor proposed for use by the City of
85
Renton as a park. South and contiguous to the site is the 18-hole
Earlington Golf Course. However, this golf course has been proposed
to be replaced by the Farlington Manufacturing Park.
The site is presently very heavily vegetated, which precludes any
opportunity for traditional forms of active recreation and discourages
most attempts of passive recreation, such as nature walks and bird-
watching.
Impacts
• Development of the site will preclude any future development or
designation for park use.
In conformance with the Green River Basth program and to be compatible
with Earlington Park's trail system, the project would continue the
lineal park along Springbrook Creek. Passive greenbelts will also be
included as indicated in the conceptual site plans. (Figure 3 on
page xiii.)
Mitigating Measures
None.
Unavoidable Adverse Impacts
None.
li
E. Maintenance
Existing Conditions
Roads, water, sanitary sewers and storm drainage systems in the
vicinity of the project area are presently maintained by the City of �I
Renton.
Impacts
Demand for public maintenance of roads, water, sanitary sewers and
stormwater drainage systems will increase due to eventual development.
• However, tax revenues generated by future development would help
offset the cost of additional service. i
86
Mitigating Measures
None.
Unavoidable Adverse Impacts
Increased demand for city maintenance service.
F. Other Governmental Services
East Side Watershed Project
The subject site is adjacent to the proposed P-1 Channel of the East
Side Watershed Project. Moreover, portions of the channel and
detention basin may be located within the site. Questions concerning
P-1 Channel location and completion will impact any development on
this site, therefore, and must be considered.
The East Side Green River Watershed Project is a federally assisted
program of watershed protection and flood prevention. It is funded
through the U.S. Department of Agriculture Soil Conservation Service
and locally sponsored by King County, Renton, Kent, Tukwila, and
Auburn.. Authorized by Congress in 1966 under the Watershed Flood
Prevention Act (PL-566) , the East Side Project has undergone a series
of changes in scope, scale, and purpose. The West Side Green River
Watershed Project - originally part of the overall plan - was
deactivated in 1977. Several miles of channel improvements have been
omitted; channel widths have been reduced by placing storage capacity
in detention basins. The original project included benefits to
agriculture, which have been deleted because most of the benefitted
area is in the process of urbanization.
The East Side Project focuses on the Black River and its tributaries -
Springbrook Creek, Panther Creek, Garrison Creek, and Mill Creek.
Proposed structural measures include enlarging or realigning about 11
miles of the existing creeks. Drainage channels will be expanded to
accommodate the 25-year storm runoff. Upstream of the confluence of
the Black River and Green River, a pump plant, which has already been
constructed, will discharge runoff from the East Side Watershed into
the Green River. This P-1 pump plant is designed to handle 100-year
87
peak flows. Because of constraints in operating Howard Hanson Dam on -_
the Green River, continuous pumping capability is limited and storage
must be provided within the East Side Project system. Most of this
stormwater storage will be incorporated in two detention basins, one
of which will be located behind the P-1 pump plant adjacent to the
subject site.
Springbrook Creek runs to the site. At the adjacentpresent time, -�
Springbrook Creek does not have sufficient capacity to pass flood
flows from upstream to the P-1 pump plant. The East Side Watershed i'_J
Project proposes to replace Springbrook Creek with a wider - 180 to
220 feet - man-made channel .
This channel would abut . the subject site to the southwest. Because
the subject site is situated close to the existing P-1 pump plant and
is adjacent to Springbrook Creek, stormwater drainage plans for the
development will be designed to deliver runoff to the creek and the
pump plant as quickly as possible. No permanent on-site retention is
is anticipated. However, the proposed development would be expected
to participate fully in the East Side Project or in other drainage
improvements in the area.
Another element of the S.C.S. East Side Project affecting the proposal
is a 23-acre detention basin immediately upstream of the pump plant
and adjacent to Springbrook Creek. This basin, together with another
detention basin further upstream, has been designed to provide flood
storage during periods of restricted pumping and to provide a large
drawdown pool for the pump plant.
The locations of the P-1 Channel and the detention basin have
tentatively been determined by the Soil Conservation Service and
by the sponsors. About 7 acres of the 23 acre detention basin will be
located within the west end of the Black River Office Park site, just
north of the existing pump plant forebay.
88
Planning for the East Side Watershed Project has been under
consideration more than 15 years. Due to this lengthy time frame, the
possibility that the drainage project may not be completed should be
examined. In the absence of an S.C.S. channel system, stormwater
drainage from the project site and from other urban developments
within the Black River drainage sub-basin--including the watersheds of
Springbrook Creek, Garrison Creek, Mill Creek, and Panther Creek, and
the valley floor in Renton and Kent lying east of the Green River --
would severely impact the existing drainage system. Local juris-
dictions would have to seek alternative means of handling stormwater
runoff. Conceivably, Springbrook Creek would need to be improved and
stormwater storage facilities would have to be provided at various
' locations in thee valley.
Impacts
Storm drainage from the subject site would be routed to the Black
River Channel where it would receive wetland treatment prior to
discharge into the drainage channel replacing Springbrook Creek.
Mitigating Measures
Some areas of the site could remain unfilled which may reduce the
amount of flood storage displacement resulting from the proposed
action.
Unavoidable Adverse Impacts
None.
5. Energy
Existing Conditions
Puget Sound Power and Light Company would provide electrical energy to
the proposed development. The Earlington Substation across I-405 from
the project and the Renton Junction Substation near the intersection
of West Valley Highway and Strander Avenue each distribute 12,470
volts and would supply the proposed project. Underground lines exist
89
along the old railroad grade, just north of Grady Way, curving around
and paralleling Monster Road. Lines also exist along S.W. 7th and
10th Avenues and along Powell Avenue S.W.
(Source: Telephone conversation with Mr. Don Rushing, Puget Sound
Power and Light Company, July 30, 1980.) '
The Washington Natural Gas Company would provide natural gas service
to the development should the developer opt for the energy source in
the future. At present a 20-inch high pressure supply main extends
along Monster Road and could supply the energy needs of the project.
Impacts
Natural gas and/or electrical energy demand from the site would
increase substantially. When site plans are more clearly defined by —I
future tenants, an estimation of energy consumption can be calculated.
, 1
According to W. J. Finnegan of Puget Power and Light's Licensing and
Environmental Compliance Division, the additional electrical load
requirements of the proposal will necessitate modification and
upgrading of the Puget Power distribution system. Development of the {�
subject proposal , in conjunction with other area developments will , as
a minimum, require the installation of a new substation and its
associated 115 kv high voltage lines. New 12.5 kv distribution lines -�
will be constructed as well . Also, Puget Sound Power and Light
Company will require a 15 foot easement on all road frontage property
lines.
In addition, energy will be consumed by commuters and service vehicles
going to and from the site.
Mitigating Measures i j
a) Insulation in roof, walls, flooring and glass should be utilized.
b) Energy analysis of building design should be performed.
90
Unavoidable Adverse Impacts
Increased demand for electrical energy and natural gas would result
from the proposed development.
6. Communications
Existing Conditions
The proposed development is within the service area of Pacific
Northwest Bell Telephone Company. The company has the ability to
supply the needed line capacity for all development in the area as
long as they are aware of the need well in advance. To accommodate
future service demands of the Renton area, Pacific Northwest Bell is
building a new facility which will be completed in late 1981.
Impacts
All telephone lines will be placed underground and will be coordinated
with installation of electrical lines. Upon completion of detailed
site plans, detailed impacts will be assessed.
Mitigating Measures
a) All telephone lines will be installed underground.
b) Installation of telephone lines will be coordinated with
installation of electrical lines.
Unavoidable Adverse Impacts
None.
7. Utilities
A. Water Supply
Existing Conditions
The proposed development is within the jurisdiction of the City of
Renton Public Works Department. A 12-inch main. runs northward along
Monster Road and turns eastward where S.W. 7th Avenue would be if
extended.
91
Fire flow is as follows: 6,200 gallons per minute (GPM) near Thomas
and 7th and 4,198 GPM at Monster Road and S.W. 7th Avenue if extended.
Source: Earlington Park DEIS. I
Impacts
The development will result in increased water demand and water lines
will need to be extended into the site. When the preliminary plat is
initiated, a computer analysis will be developed to assess the impact
of the development on water pressure and availability. --
I
Mitigating Measures
None.
Unavoidable Adverse Impacts
Increased demand on water supply.
B. Sewers
Existing Conditions
The City of Renton is the implementing agency for sewer service in the
area of the proposed development. The Metro gravity line extends
along S.W. 10th Street and terminates at Metro's Renton Sewage
Treatment Plant. A 10-inch sewer line extends from S.W. 7th Avenue
along Powell into the Metro gravity line.
Impacts
The development will result in increased sewage flows. When site �—
plans are more clearly defined by future tenants, an estimated sewage
facility demand will be calculated aid impacts will be assessed.
Mitigating Measures
None.
Unavoidable Adverse Impacts
Increased sewage flows.
92
C. Stormwater
Existing Conditions
Presently there is no closed stormwater drainage system on the site.
All water either percolates back into the ground, ponds, or flows off
the site in the form of runoff. Nearly all soils on the site are
moist to wet throughout the year, with large areas of seasonal
ponding. An 18-inch line runs along Powell Avenue S.W. and empties
into a 36-inch line along S.W. 10th Street. This line empties into
Springbrook Creek south of the site., A 60-inch line along S.W. 7th
Street, which serves properties to the east, discharges into the olH
Black River Channel .. Runoff from the hillside to the north of the site
is partially diked from the site by the railroad. Drainage flows
from the Earlington Woods PUD being constructed will be directed
through a portion of the subject property to the old Black River Channel.
Impacts
The total volume of runoff from the site will increase due to greater
impervious surface. The drainage system for the site will be designed
for no detention capacity and will be able to carry off a 25 year
frequency storm. It is planned that surface water runoff would be
directed to the existing Black River Channel to receive treatment
prior to discharge into Springbrook Creek.
Mitigating Measures
Site runoff will be directed to the old Black River Channel where it
will receive wetland treatment prior to discharge into Springbrook
Creek.
Unavoidable Adverse Impacts
Increased stormwater runoff volume as a result of project development.
D. Solid Waste
Existing Conditions
The businesses and residences in the surrounding vicinity are
currently served by General Disposal Company. Dumpsters will be
required and can be rented from General Disposal , available in 1 to 40
93
yard sizes. The solid waste is taken to the Renton Transfer Station
on N.E. 4th Street and weighed, and ultimately is taken to the Cedar
Hills Landfill off of Maple Valley Highway for disposal . !
Impacts
' The proposed development will increase the demand for solid waste
collection, which can be adequately provided by General Disposal
Company. The solid waste landfill has the capacity to absorb the
increased demand. (Source: Telephone communication with Debra Albiso,
King County Solid Waste Division, 1/21/81) .
Mitigating Measures
None.
Unavoidable Adverse Impacts -The demand for solid waste collection would increase.
8. Human Health
Impacts _J
It is not anticipated that the proposed action would result in adverse
impacts to human health other than possibly noise, especially during
construction.
The human response to noise has been documented by the Environmental
Protection Agency. Continuous noise at high decibels is not only
irritating, but can cause damage to the hearing mechanism and
otherwise impair both physical and mental health. Prolonged noise
exceeding 80 decibels (dBA) can result in hearing loss. Noise in
excess of 55 dBA can interfere with speech and communication, and that
above 35 dBA can disrupt sleep. Other physical effects from
continuous excessively loud noise levels are increase in blood
pressure, and alternations in heart rate, which are usually temporary,
but may become chronic. It is improbable that environmental noise in
itself causes mental illness; however, the continual exposure to a
noise by a person already suffering in a depressed state may promote
stress in that person, which does aggravate the condition of mental
illness.
94
Although noise levels during construction may exceed comfortable
levels for area residents, during occupancy, average noise levels are
expected to remain below the Washington State Department of Energy
Noise Limitations. (See Table 4, p. 67 .)
Mitigating Measures
See "Noise - Mitigating Measures" , p. 71-72.
Unavoidable Adverse Impacts
Increase in potential of aggravation of mental health of nearby
residents due to an increase in noise levels.
9. Aesthetics
Existing Conditions •
The site, located at the southern base of Earlington Hill , is
presently undeveloped and heavily vegetated with riparian forest. It
serves as a visual extension of the open space provided by the
Earlington Golf Course to the south.
The site is most clearly visible from the Empire Estates residential
complex situated atop Earlington Hill to the north of the site. At
this time, southerly views from the higher units afford a vista
consisting of mixed deciduous and conifer hillside in the foreground,
Earlington Golf Course, Longacres and industrial warehousing in the
middle distance, and Mount Rainier and the Cascade foothills in the
far distance.
The hillside southeast of Empire Estates has been cleared and is stated
to be replaced by the Earlington Woods Planned Unit Development.
Impacts
Development of the site will convert a dense riparian forest into an
office park characterized by warehouses and office buildings with
preserved wetland areas incorporated into the design. The development
will be visible to occupants of Empire Estates, Earlington Golf
Course (proposed to be developed as a manufacturing park) , Earlington
Woods P.U.D. and motorists on Monster Road.
95 {
View impacts as a result of development would be noticeable but not '
significant from the residences on Talbot Hill (approximately 1/2 mile
to the southeast) and from Grady Way to the south. More significant
would be the alteration in southerly views from residences in Empire
Estates to the north of the site. Their view of riparian vegetation
would be largely replaced by buildings and parking areas.
Similarly, future residents of the proposed Earlington Woods P.U.D.
would experience westerly views of an office park rather than the
existing riparian forest, on that portion of the proposal site.
Mitigating Measures
Site design and retention of some existing vegetation will soften the
impacts of the bulk and mass of buildings. —�
Unavoidable Adverse Impacts
The visual appearance of the site would be altered in that natural
open space views would be replaced by urban views.
10. Historical/Archaeological
Existing Conditions
Duwamish villages are believed to have existed on the Black River.
One of these, Squo'l-qo, was situated at the confluence of the Black
and Green Rivers. The inhabitants of this village maintained a fish -I
weir on a small creek nearby, possibly Springbrook Creek. Indian
villages moved often, forced by the changing course of the river and -a
the cultural preference for relatively clean surroundings. Recently
two village sites of the 19th century were discovered a short distance
east of the project area. Three other sites have been reported, one
in the Renton Shopping Center, another at the site of the IBM
Building, and a third at the northeast portion of the proposed
Earlington Park.
Given the high population density on the Black River in historic times'
and the large number of recorded and reported sites in the vicinity of
the proposed project, the probability that additional sites exist in
the project area is extremely high.
96
The Institute for Environmental Studies' Office of Public Archaeology
at the University of Washington has conducted a preliminary assessment
of the potential archaeological significance of the subject site. A
letter indicating its findings and recommendations has been included
in Appendix D, p. D-2 of this document. It is suggested that a
subsurface coring program be implemented at intervals of 25 meters in
those areas that are judged to have high archaeological potential and
at 50 meter intervals in other disturbed areas. Thus, coring would
not be conducted along the old Columbia and Puget Sound Railroad grade
bisecting the site from east to west, the present railroad tracks at
the northern boundary of the property and in the channel of the old
Black River.
Impacts
Project development may cover archaeological sites of potential sig-
nificance, specifically DuwanxLsh Indian sites.
Mitigating Measures
Prior to the commencement of construction activities, the proponent
will authorize implementation of a coring program. As suggested by the
Office of Public Archaeology, any portion of the site which may be de-
termined to have archaeological significance could be retained in open
space until excavation can be completed. •
•
Unavoidable Adverse Impact
Potential removal of an archaeological site.
11. Economics
Existing Conditions
The site of the proposed action is located within the Seattle
metropolitan area which is currently' experiencing substantial economic
growth. The lower Green-Duwamish River Valley is evolving as an
industrial-distribution center and has long served as a transportation
center.
A representative of Caldwell Banker, Commercial Real Estate Services
has provided an informational letter which has been included as page
D-6 of Appendix D.
It states that presently there exist 32 uillion square feet (s.f.) of
97 industrial space in Renton-Tukwila-Rent area. Of this space, approx-
imately 1 million s.f. is vacant, which represents a vacancy factor of
3%. (About 485,000 s.f. of this total vacant space was constructed
during 1980.) At the present rate of absorption of 200,000 s.f. per
month, the existing inventory of vacant industrial space would be oc-
cupied in five months.
It is acknowledged that industrial real estate conditions may alter con-
siderably prior to the time the Black River Office Park is scheduled for
completion. However, the proposed site would be attractive to tenants
needing rail access because it is one of two sites in the Valley equip-
ped with reciprocal switching from both Burlington-Northern and Union
Pacific without penalty to the shipper, except on very short, local
hauls.The South Seattle market for office space (which includes the Sea-Tac,
Tukwila and Renton areas) has a low vacancy rate of 3.4 percent, ac-
cording to a market report prepared by the Coldwell Banker Management
Corporation.1 A total of 495,000 square feet of office space is sche-
duled for completion in the winter of 1980. This would represent a
637 increase in the market supply of office space in this area. Az..-
cording to Brent Nicholson of Coldwell Banker, the 1980 absorption
rate for office space in south King County was 562,000 square feet.
Presently, about 253,000 square feet of new office space in this area
is slated to be available for occupancy during 1981, however, because •
1981 absorption rate projections are not readily available, it is dif •
-
ficult to predict the vacancy rate for office space at the time of pro-
ject implementation.
J
Impacts
The project would create short-term construction employment. The
development would also partially ease the demand for industrial
buildings space. The City of Renton will receive an increase in tax
revenues and municipal costs generated from the project.
Mitigating Measures
None.
Unavoidable Adverse Impacts
Unknown.
1'The Seattle Market 1980, Coldwell Banker Commercial Brokerage
Company, January 1980.
98
SECTION FOUR
UNAVOIDABLE ADVERSE ENVIRONMENTAL IMPACTS
I. The Physical Environment
A. Earth
1. Changes in the contours of a portion of the site, including
excavation depths of a maximum of 10 feet for utilities.
2. Addition of fill over native soils.
B. Air
1. Increased air pollution from automobile emissions.
2. Increased particulate levels due to construction activity and
additional traffic volumes.
3. Short-term odors during construction activities.
C. Water
1. Increased surface runoff from the site which will contain an
increased level of urban pollutants.
2. Potential alteration of ground water movement, quantity and quality
on the site.
3. Project development will result in increased surface runoff and
simultaneous reduction in flood storage capacity of the site, ' which
will contribute to flooding conditions until the construction of the
P-1 Channel and detention pond is completed.
D. Flora
Elimination of up to 78% of the natural vegetation on the site.
E. Fauna
A reduction in the ability of the site to serve as habitat for wildlife;
redduction in number and diversity of wildlife through elimination of up
to 78% of the natural vegetation on the site.
99
F. Noise
1. Increased noise levels over the short-term due to construction
activity.
2. Increased noise levels over the long-term due to human activity and
increased traffic and rail volumes.
G. Light and Glare
Light and glare will be emitted from the site to surrounding properties.
H. Land Use
1. Replacement of open space and natural riparian forest on most of the
site with warehouse/office uses.
2. Preclusion of alternative land uses for the site during the life of
the project.
I. Natural Resources
1. Consumption of building materials and energy.
2. Conversion of 'natural open space to warehousing and office uses. I
J. Explosion or Hazardous Emission
Project development would result in increased risk of explosion or ` _
hazardous emission.
II. THE HUMAN ENVIRONMENT v
A. Population and Housing
Very slight increase in population to the city. -
B. Employment �-
None.
C. Transportation/Circulation
Traffic impacts will be increased as a result of project development.
100
D. Public Services and Utilities
Increased demand for all public utilities and public services.
Cumulatively, with other developments in the valley, utilities and
services will eventually need to be expanded.
E. Aesthetics
Visual appearance of the site will be altered in that natural open space
views would be replaced by urban views.
i I
F. Archaeological/Historical
The potential removal of an archaeological site.
G. Economics
•
Unknown.
. u.
•
101
SECTION FIVE
IMPACTS DETERMINED NOT TO BE ADVERSE
- The demand for industrial and related office space served by railroad and
accessible to major arterials (I-405, I-5) will be eased.
- Increase in employment opportunities.
- The City of Renton's tax base will be increased.
r SECTION SIX
SHORT-TERM USES VS. LONG-TERM PRODUCTIVITY
This section addresses (1) the tradee-offs between short-term gains and long-
term environmental losses, (2) the benefits and disadvantages of delaying
development approval , and (3) future options that might be foreclosed by
implementing the project.
Project approval would commit the site to manufacturing park use for at least
50 years, although the structures and foundations would endure for a
considerably longer period of time. Implementation of the project, therefore,
would represent a trade-off between urban development and continuation of the
existing open space.
Realization of the project would result in economic benefits to private
investors, as well as increased employment opportunities and tax base with
related cost to the public and private sectors. An increment of: the regional
demand for rail-served warehousing and business/office park space would be
satisfied. A warehousing/office complex would be provided in the City of
Renton adjacent to established industrial areas. These benefits are balanced
against the permanent loss of approximately 71 acres of open space. In
addition, long-term modification of soils, hydrologic patterns and natural
vegetation would occur.
Benefits of deferring the rezone or reserving areas for future options would
include: delay of an increase in local traffic volumes, noise levels, light
and pollution levels; the retention of existing vegetation and soils and
preservation of habitat areas.
102 -
!i k
I �
Implementation of the project would preclude the exercise of the future option
for the site, namely preservation of a major open space in response to future
demand for urban greenbelts.
•
On the other hand, deferring the rezone would present some disadvantages.
Development at some future time would face increased costs because of
inflation and the potential scarcity and increasing costs of building
materials. Demand for rail-served warehousing and for office space would not
be met at this location. Development of suitable alternate locations within
the region, however, could occur with varying environmental costs of the same
increment of industrial growth.
Delaying of the rezone might allow the development of a project that would be
11 more or less compatible with the surrounding land uses or that would otherwise
result in greater or lesser environmental impacts.
SECTION SEVEN
IRREVERSIBLE AND IRRETRIEVABLE RESOURCE COMMITMENTS j-'
Implementation of the proposed project will convert the best remaining climax
riparian forest in the Seattle area to a warehousing/office park. Although
construction could be planned in phases with retention of some wetlands, the
ultimate result of development will be the irreversible and irretrievable loss
of an open space resource. Approximately 71 acres of open space will be
converted to urban uses. Native soils and natural vegetation of the site will
also be committed to urban development. -
The use of various construction and building materials required for
development of . the proposed land use can be considered an irreversible
commitment of these materials, as well as the energy utilized in providing
them.
Development of the subject site into the proposed land use will require
commitment of human resources. Labor and services required of persons in the
construction operation, and maintenance of the project facilities are
considered an irretrievable commitment of human resources. Additionally, the
103
municipal and public services required to maintain the project will require a
commitment of the associated human resources to this area rather than others.
$ The proposed use will require a long-term commitment of energy resources, and
solid waste facilities. All electrical power and water expended and the waste
treatment and solid waste facilities utilized during construction, operation,
and maintenance of the proposed project are considered irreversible and
irretrievable commitments.
The capital expenditures necessary for construction will require a substantial
monetary commitment by both the proponent and the City of Renton. However,
monies committed to the development should be retrievable over the life time
of the project, through the operation of the project facilities.
Difficulty of retrieving a portion of building materials at the end of the
project's life is dependent on the building design. Glass and aluminum
windows could be recovered. If bricks are used in construction, they could be
re-used.
The form in which other materials will be used is not generally re-useable at
the end of the project's useful life. The commitment of utilities and
services to the subject site could be utilized at the end of the project's
useful life.
1--
104
SECTION EIGHT
MITIGATING MEASURES
The Physical Elements of the Environment
Earth
- Excavation and grading operations on the site will be performed in
conformance with the City of Renton Mining, Excavation and Grading
Ordinance.
- Topographic changes could be restricted to limited portions of the site.
Unique Physical Features
- Existing vegetation will be preserved on significant portions of the site.
- A master landscape plan will be prepared to ensure good design practice
and preservation of as much of the riparian vegetation as possible.
- As many of the existing trees as possible should be retained through
maintenance of greenbelt areas in order that the large groups of trees
and understory remain undisturbed.
Air
- Low emission construction equipment will be used whenever possible.
▪ Measures to control construction dust, such as watering, cleaning and
sweeping of streets at the end of hauling activities should be performed
by the contractor.
Water
- ' ,Temporary detention and settling ponds should be utilized during
construction of foundations to collect silt and minimize turbidity.
' - Stormwater runoff will be collected in a storm sewer system approved by
the Renton Public Works Department.
- Oil/water separators should be utilized to remove petroleum products from
stormwater.
105
- Catch basins and screens should be included in the stormwater system to
collect litter and debris.
- No development will occur within a 50 foot setback from the tops of the
11
bank of the Black River Channel .
- Fill material will be required to bring some building sites above the 100 ti
year flood plain.
•
- Some areas could be left unfilled which may reduce the amount of flood
storage displacement that occurs on the site.
- Adequate street and parking area cleaning and maintenance of the
stormwater system should be provided.
Flora
- As many of the existing trees as possible should be retained through
maintenance of green belt areas in order that large groups of trees and
understory are left undisturbed.
- A master landscape plan will be prepared to assure good design practice
and preservation of as much as the riparian vegetation as possible.
11
- Placement of building sites, parking lots and roads should be based on
tree inventories provided by field surveys.
- Vegetation along Black River Channel should be preserved and maintained
by the proponent.
Fauna 1'
- Landscaping materials that provide food sources for birds and small
animals should be utilized.
- As much natural vegetation should be retained as possible.
1
106
- Surface water quality along Springbrook Creek should be preserved by
planting natural riparian vegetation along the drainage-way banks and
maintaining wetlands wherever possible.
Noise
- Noisy operations should be scheduled so that they are not concurrent.
- Phased development should be planned which would reduce the size of
movements of construction noise.
h - Construction equipment should be operated only between the hours of 7:00
a.m. and 7:00 p.m. Monday through Friday.
- Only construction equipment that does not exceed State of Washington
maximum environmental noise standards should be used.
11
- Construction equipment should be placed as far away from sensitive noise
receptors as possible.
- Construction activity should be scheduled so that all truck traffic does
not occur concurrently in order to avoid vehicle congestion.
h
- Landscaping, careful site design and berming should be utilized near main
roads to deflect noise and reduce its impact.
- Installation of rubberized railroad crossings where the access road would
intersect the railroad spurs to the south of the site would decrease
noise generation.
- (See "Vehicular Transportation Generated - Mitigating Measures," p.81.)
Light and Glare
- Building wash lighting should not be used.
- Perimeter landscaping, fencing and berming, especially around parking
areas and road entrances coudl reduce light spillage.
107
- Parking area lighting could be directed so that no direct light spills
off the site.
Land Use
- An alternative development design with limited building area could retain
significant areas of the site in open space. I
Natural Resources
- Building elements could be analyzed for use of techniques, wherever
possible, permitting recovery of materials used in construction.
The Social Elements of the Environment
Transportation/Circulation
a) To reduce potential safety hazard, Monster Road should be 11
upgraded to accommodate heavy trucks and increased traffic
volumes. This may involve rechanneli7ition and possible
signalization of the Sunset Boulevard/Manster Road inter-
section.
b) To discourage the use of single occupant vehicles, the City
may consider limiting the number of required parking spar as
to less than is currently prescribed by the zoning code.
c) The road proposed to be constructed along the west edge of
Earlington Park, to the south of the site, could be extended
in such away to provide westerly access auk the Black River
Office Park, in order to reri»cP traffic volumes that flora
through Earlington Park.
d) Establish a new bus route or modify an existing bus route to
pass through the project.
e) If bus service is modified to be convenient, provide bus
passes as a company or office park benefit.
107a
f) Office park management should advise tenants and their
employees of the advantages of fleet ride, vanpool and car-
__ pool programs through a package of information provided at
initial occupancy for each tenant and coordinated through the
Seattle-King County Commuter Pool agency. Office park manage-
,
ment should also schedule public information meetings for
employers and employees.
g) As much as practical, office park management should encourage
employers to initiate a flextime work schedule so peak period
traffic can be distributed more evenly over the 3:30 to 5:30
p.m. peak period.
h) Any roadwork on-site could be conditioned to allow open at all
times a portion of the road wide enough to pet emergency
vehicle access.
i) Grade an alignment from Thomas Avenue S.W. which would intersect
the road system on-site with a gravel sub-base wide enough to
allow emergency vehicle access.
j) Disruption of traffic flow in the internal road system could be
minimized by installing utilities, within the right-of-way, but
outside the roadway proper.
Fire Service
- Sprinkler systems installed in buildings per City Code and Fire
Marshall 's requirements will reduce the amount of fire flow required.
- Non combustible building materials would reduce risks of fire.
- Industrial tenants could be limited to uses that do not utilize any
flamable materials.
-1
Police Services
- Tax revenues generated from the development will help offset the cost of
'_ ' additional service.
108
- Internal security systems could be installed in the building.
- Exterior lighting should be placed at strategic locations to provide
additional security measures.
Hospital Facilities
- On-site first aid facilities within major buildings should be provided.
Energy
- Insulation in roof, walls, flooring and glass should be utilized. Energy
analysis of building design should be performed.
Communication
All telephone lines will be installed underground.
Installation of telephone lines will be coordinated with installation of
electrical lines.
Stormwater Drainage
Site runoff will be directed to the old Black River Channel where it will 1
receive wetland treatment prior to its discharge into Springbrook Creek.
Human Health
See "Noise - Mitigating Measures."
Aesthetics
Site design and retention of some existing vegetation will soften the impacts l
of the bulk and mass of buildings.
Archaeological/Historical
Any portion of the site which may be determined to have archaeological
significance could be retained in open space until excavation can be completed.
•
109
SECTION NINE
ALTERNATIVES
1. Development of 75% of the site with 25% of the riparian forest retained in
clustered open space.
Description
Site Coverage
Use Acreage Percentage
Office 34.19 48%
Warehouse 12.13 17%
Roads 2.85 4%
Open Space 7.12 10%
Riparian Forest 14.87 21%
The primary difference between Alternative 1 and the proposal is the configura-
tion of the riparian forest. The proposal would retain the portion of the for-
est which parallels the Old Black River Channel, providing a buffer between de-
velopment and the channel. With Alternative 1, the shape of the riparian for-
est would be clustered or concentrated internal to the site, rather than form-
ing a complete buffer along the channel.
The purpose of including this alternative is to ascertain the advantages of one
11 configuration over another with respect to adverse impacts on the physical and
human environments.
Impacts
Alternative 1 represents approximately the same mixture of uses and building
site coverage percentages as the proposal. Therefore, it may be assumed that
the number of employees, the volumes of traffic, the impacts on air quality and
the demand for public services and utilities to be generated from implementa-
tion of Alternative 1 would closely approximate those impacts of the proposal,
which have been discussed in detail throughout this document. It was also de-
termined that both scenarios would have very similar impacts on soils, topography
and hydrology.
( Although the amount of noise generated in both scenarios would be about the same ,
the impact of higher sound levels on faunal species would differ in each case.
The clustered riparian forest would offer a greater distance from noise sources,
thereby potentially reducing its adverse impact on species which require seclu-
sion from human activities.
With the implementationof either scenario, the diversity of types of both flor-
al and faunal species will be altered. Larger mammal species, such as deer,
hawk and eagle are more apt to be attracted to a clustered forest rather than a
lineal greenbelt. However, because the linear shape would feature increased
brushy, "edge" areas, the populations of birds and small rodents would increase
with an elongated riparian habitat.
110
Feasibility
This alternative would accomplish the objective of the proponent in much the
same manner as the proposal.
2. Concentrated Development "
Description i
Development of 33 acres' ofthe site with 38 acres remaining in open space.
Site Coverage
Percentage
Use Acreage (of 33 acres)
Warehouse 5.86 16%
Office 16.62 50%
Roads .33 1%
• Open Space 11.0 33% ,,�
(About 4.5 acres of the to-be-developed half of the site is presently
cleared. 28.5 acres of this one-half is comprised of riparian forest.
38% (or 11 acres) of this riparian forest would be retained on the
developed half of the site and 72% of the riparian forest would be
retained over the entire site.)
Impacts • "
- 1/
Overall, implementation of Alternative 2 would reduce.by roughly one-half the
adverse impacts resulting from development of the proposed action. Specific-
ally, no development would occur in the western portion of the site. Thus, :
38 acres would remain in open space and riparian forest uses. Direct impacts
on soils, topography, flora, fauna, light and glare, noise levels and natural _
resources for that 38-acre area would be eliminated.
Indirectly, increased noise levels from construction and long-term human activ-
ity an the eastern portion of the site may drive reclusive faunal species from
their habitat and discourage migratory species from utilizing the forest. '
L.
Construction of impervious surfaces on 707. of the 33 acres to be developed
could disrupt natural drainage flows on the western portion of the site, thereby
altering existing types of floral species. ' .
Impacts to the physical environment in the 33 acre developed portion of the site'
would be comparable to those of the proposed project, but the extent of adverse
impact would be theoretically reduced by one-half. Therefore, less than 50,000
cubic yards of fill would be required, rather than the 100,000 cubic yards for -,
the subject proposal. Hydrology over the eastern portion of the site would be ti,
disrupted and directed to the old Black River Channel, whereas the western half
would largely retain its natural drainage flows.
111
Because over half of the site would remain undeveloped, one may similarly
assume that potential adverse impacts on the human environment (employment,
public services and utilities, energy, noise, transportation/circulation
and air quality) would be reduced by about one-half. Therefore, from
4,535 to 17,015 vehicles would be generated each day, with 625 to 1,985
vehicles operating during the evening peak hour. Approximately 2,000
employment opportunities would be created on the site. Retention of
the majority of the riparian forest would minimize the adverse aesthetic
impacts of tree removal resulting from project implementation.
Feasibility
This alternative would reduce the amount of leasable building space by an
undetermined amount. Further, there is a high demand for rail-served
warehousing which may not be fully utilized if the project were to
- limit this use. For those reasons, the proponent considers this
alternative economically infeasible.
3. No Development
Description •
This alternative would leave the site in its undeveloped state on a
permanent basis or on a temporary basis until some other proposal for
development is approved by the City.
Impacts
11 All adverse environmental impacts of the project would be eliminated.
The positive economic benefits of the project are increased property
taxes, creation of short and long-term employment and partial alleviation
in vacant industrial land demand. Municipal services adn capital costs
would not be incurred. The most significant impact of this alternative
would be preservation of the riparian forest. This would extend the
opportunity for the City to purchase the site and preserve it as a green
belt. However, no development would shift the impacts of development to
other sites which could be more or less suited for these uses.
However, pressure to develop would continue due to Manufacturing Park
designation on the Comprehensive Plan, development of the surrounding
properties and, increasing demand for industrial land development.
Feasibility
The "no development" alternative would not meet the objectives of the
proponents. The feasibility of the City acquiring the site for the
purpose of preservation is unknown, but the market value of property is
high and the City' s Comprehensive Plan designates the site for
manufacturing park use.
112
Table 10
Comparative Analyses of Alternatives
Proposed Action Percentage of
Use Acreage Site Coverage
1
Office 35.58 50%
Warehouse 12.09 17%
Roads 2.85 4%
Total developed 50.52 71%
Open Space 7.25 10%
Riparian Forest
to Remain 13.39 19%
(Approximately 22.5% of the riparian forest would remain upon development) 1
Alternative 1 - Development of 75% of the site with 25% of the riparian forest
retained in clustered open space.
Site Coverage
Use Acreage Percentage
Office 34.19 48%
Warehouse 12.13 17%
Roads 2.85 4%
Open Space 7.12 10%
Riparian Forest 14.87 21%
� 5
Alternative 2 - Development of 50% (33 acres) of the site with 38 acres re-
maining in open space. 1/
Site Coverage
Use Acreage Percentage
Office 13.62 46%
Warehouse 5.86 16%
Roads 0.33 1%
Open Space 3.0 4%
Riparian Forest 11.0 33%
(About 4.5 acres of the to-be-developed half of the site is presently cleared.
28.5 acres of this one-half is comprised of riparian forest. 38% (or 11 acres)
of this riparian forest would be retained as open space on the developed half of
site. 72% of the riparian forest would be retained over the entire site. .
Alternative 3 - No Action
Site Coverage
Use Acreage Percentage
Undeveloped open space 71.16 100%
(11.5 acres of the site are presently cleared. About 59.5 acres of the site
are presently comprised of riparian forest and open space.)
113
SECTION TEN
REFERENCES
GEOLOGY, SOILS, TOPOGRAPHY
Preliminary Soils Exploration, Proposed Black River Industrial Park,
Renton, Washington, Rittenhouse-Zeman and Associates, Inc. , December 1979.
Soil Survey for King County, U.S. Department of Agriculture, Soils
Conservaton Service, 1973.
_ 'I AIR
Air Quality Data Summary, Puget Sound Air Pollution Control Agency,
Seattle, WA, 1977, 1978 and 1979.
1980 Quarterly Air Monitoring Data Summary, Department of Ecology, State
of Washington.
Compilation of Air Pollutant Emission Factors, Environmental Protection
Agency, AP-42 (with revisions) , Research Triangle Park, N.C. , 1973.
Ambient Air Quality Standards, Washington State Department of Ecology,
Olympia, WA 1971.
Climatological Handbook-Columbia Basin States, Pacific Northwest River
Basins Commission, Vancouver, Washington, 1968.
WATER (HYDROLOGY AND WATER QUALITY)
Draft EIS, Eastside Green River Watershed Project, King County, WA. , Soil
Conservation Service, USDA, November 1978.
A Profile of Water Quality in the Cedar-Green River Basins , Tech.
Appendix #5, Metro, September 1978.
The East Side Green River Watershed Project, The Black River Marsh, Jones
and Jones, Landscape Architecture Environmental Planning, January 1979.
Wetlands Study: A Reconnaissance Study of Selected Wetlands in the City
of Renton. City of Renton Planning Department and Northwest
Environmental Consultants, Inc., February 1981.
FLORA AND FAUNA
Draft EIS, Eastside Green River Watershed Project, King County, WA. Soil
Conservation Service, USDA, November 1978.
Aerial Photograph, Walker Associates, October 1979.
Black River Office Park Vegetation and Bird Report, Mike Lee, ASLA,
October 1980.
114
NOISE
Maximum Environmental Noise Levels, Washington State Department of
Ecology, (WAC 173-60), Olympia, WA, 1975.
Motor Vehicle Noise Performance Standards, Washington State Department of
Ecology, (WAC 173-62) , Olympia, WA, 1975.
Highway Noise Impact U.S. Environmental Protection Agency, Washington, 1
D.C., May 1977 (550/9-7T-356).
Draft Environmental Impact Statement for Earlington Woods Planned Unit
Development, City of Renton Planning Department, January 1979.
Noise from Construction Equipment and Operations, Building Equipment and
Home Appliances, U.S. Environmental protection Agency, NTID 300.1, 1971,
by Bolt, Beranek and Newman.
Noise Exposure Standards for New Construction Sites, DHUD, Washington,
D.C., 1973. (For HUD financed projects.)
LAND USE
Renton Urban Area Comprehensive Plan, Renton, Washington, July 1965.
King County Agricultural Protection Program, Background and Effects of
Ordinance 3064 Designating Agricultural Lands and Districts in King
County, King County, February 1977.
Preliminary Geologic Map and Brief Description of the Coal Fields of King
County, Washington, 1945, by W.C. Warren, H. Norbisrath, R.M. Griveth and
S.P. Brown.
POPULATION AND HOUSING
Characteristics of the Population - 1970 Census of Population, Census
Bureau, Washington, D.C., 1973.
Puget Sound Council of Governments, Central Puget Sound Region -
Population and Housing Estimates as of April 1, 1976, Seattle, WA, 1977.
Population Trends, 1978, Washington State Office of Financial Management,
Population Enrollment and Economic Studies Division.
Comparison of IRDP , Metro 201/208 RIBCO and RDPI AAM Population
Forecasts, Seattle, WA, 1977.
EMPLOYMENT
Market Profile Analysis, Volumes 1 and 2, by Donnelley Marketing,
1979-1980.
Industrial Vacancy Index of the United States, Coldwell-Banker Commercial
Brokerage Company, March 1979. Seattle Post Intelligencer, April 29,
1979.
115
Land Use Inventory by Puget Sound Council of Governments, 1961 and 1965.
TRANSPORTATION
David Markley of the Transpo Group, "Black River Industrial Park
Analysis."
PUBLIC UTILITIES
Community Facilities Plan, Renton, WA, July 1965.
Utilities Report Renton Urban Area, Renton, WA, April 1965.
ARCHAEOLOGICAL/HISTORICAL
The Identity and Treaty Status of the Duwamish Tribe of Indians, Barbara
Lane, 1975.
GENERAL INFORMATION
Earlington Woods Planned Unit Development Draft EIS, City of Renton
Planning Department, Renton, WA, January 1979.
Zoning Act of the City of Renton, Chapter 7.
Green River Valley Comprehensive Plan.
A River of Green, by Jones and Jones for King County, 1979.
APPENDICES
A. Legal Description
B. Soils Analysis
C. Flora and Bird Report
D. Incoming Correspondence
Letter from the Washington State Office of Archaeology & Historic
Preservation
Letter from Office of Public Archaeology
Letter from Renton City Fire Marshall , Mr. Jim Matthew
Letter from Mr. Milton Reimers of Coldwell Banker
Letter from the TRANSPO Group
•
•
Appendix A - Legal Description
•
•
•
•
•
•
Chicago, Milwaukee, Su Paul & Pacific Railroad
Legal JG.^-.Jcit_on of Property To Be. Sold.
.
That portion of the southeast quarter and the southwest
quarter of Section 13, Township 23 North, Range 4 East,
W. M. and that portion of the southwest quarter . of Section
18, T Ownshi.o 23 North, Range 5 East, W. M. all in King
CDCounty2 .Wa shin gton described as follows: .CLJ `
`d' Beginning at the south quarter corner of said Section 13 ;
CD
CD
' a0 Thence N 00°58' 28" B along the North-South centerline of
. said Section 13 a distance of 884.84 feet to the southeast
corner of Tract 26 of Renton Shorelands Second Supplemental
Maps, 1958, and the true point of beginning;
r
Thence S 72°37' 52" W along the south boundary of said Tract
26 a distance of 382,60 feet;
• bz
Thence N 70°54' 02" W along the south boundary of said Tract c o
26 a distance of 73.51 feet tO the eastline of the Charles rz m
Brownell Donation Land Claim No, 41;
•
o 7 •
Thence N O10-.
°2r' '" B along said east line a distance of
950.58 feet to a line 35 feet southerly of and parallel acn
with the centerline of the existing most southerly track
. of the Chicago, Milwaukee, St. Paul & Pacific Railroad
tracks; • •
Thence along said line 35 feet southerly of. and parallel •
with the centerline of the most southerly ' ck l Vn a
curve to the right,hi'., the center of wh .ch bears s S 15°2 2 0 3 2" E ;?
having a radius of 2,790.19 feet, an arc distance of 659.24
feat through a central angle of 13°32'14" to a point. of
compound curve;
•
Thence along 'a curve to the right, along said parallel line, .
the center of which bears S 01°50' 18" E having a radius of
�'6feet, distance of 807.11 feet ' �h
1, 82.. �� an arc j=�.,�.�, tl.=GiIC"� a
central angle of' 41°56 2 46" ;
•
Thence S 49°53 ' 32" E, along said parallel line, a distance
•
of 167,07 feat;
Thence along a curve to the e'6A7-7-
:c' ht a;tong said parallel line
•
1
•
A-2 '
Legal description co•:t°d • • Page 2
•
having a radius b:s of 1,829.78 feet, an arc distance of 309.67 .
feet through a:i central angle of 09 41. as
CO Thence leaving said parallel line, S 40°11 a 4 •" E a distance
•
0 of i 26.24 feet to a point on the south line of tie Burlington
.d- Northern Railroad Right of Way;
s
N •
CD Thence along a curve to the left, along said south line, the
CD a radius of
center of which bebearsN 4.9°=�•8'iC��a E having
co 1,005.37 feet, an arc distance of 549.02 feet through a
central angle of 31°17°19" to a point of tangent on said ,
south line of the Burlington Northern Railroad Right of Way;
Thence continuing along said south line, S 71°29' 03" B along
a line 50 feet south of and parallel with the .existing' ,
southbound track, a distance of 826..56 feet to the west line
of said Section 18;
Thence continuing along said south line S 71°29; 03" E a
distance of 85.52 feet to the• north line of the south 650 -
feet of the southwest quarter of the southwest quarter of
said Section 18; .
•
Thence e ° , ,^:a Wnorth linesouth650
•.�,..c�.. N 89 10 0 along the of the
. feet of said southwest quarter of the southwest quarter of
Section 18 a• distance of 81.57 feet to the east line of the .
• southeast quarter of said Section 13 :
•
Thence N 88°15 a 00°' W along the north line of the north 650
feet of the southeast quarter of said Section 13 a distance '
. of 2261.41 feet to an angle point on the south boundary of
Tract 25 of RentonShore Lands, 1958;
T: ° 7 " T south distance .
Thence N 33 07 25 1I along said boundary a
. of 154.51 feet to an angle point;
Thence •
° z " said south boundary a distance
N 2 ! 1l s 2 .r along .Jo 1w a..1
of 387.32 feet to an angle point;
• Thence N 83°17' 25" W along said south boundary a distance ,
of 171.17 feet; •
• Thence S 66°22• 22" W alongsaidsouth boundary a distance .
� s .�
of 324.66 feet;
Thence S 72°37' 52" N along said south boundary a distance
of 76.33 feet to the true point of beginning.
•
•
. .
• HA NS EN J OHN R 11N C
•
32-68-H •
. BELLEVUE WA 14,00 •
Ai • • .
•
• •
•
•
••• • . •
• •
. •
OT...9024 __PO.R-OF-S.E....1/4 -C.. SW 1/4- 0 F S7R-13-23,-04-D F. ---b G AT-S -1/4-
CDR OF SU SEC 1 3-TH N 00-58-28 E ALG N/ S C/L OF SD SEC 13 A DIST OF fit3 4.84 PT TO SE CUR OF TR 20
RTM EN ION SHORELAN DS 2ND SUP L C TP 013 TH S 72-37-52 w ALG S BNuRY . SD TR 26 A u1ST OF 382. 60 FT
IJ 70-54-02 W ALG S RY OF SD 1R 2o A DIST OF 73.51 FT . ' TO .E LN OF CriAS BROwNELL DC
41-Iii-N LG S 5- FT-S - PLW tJL OF-.MUST SLY TR
OF C M ST P & P RR IRS TN AU, -. • SD LN 35 FT SLY OF C P LW C/L OF . SD MO ST SLY TR AL G CRV TO .RGT•
C 11-c OF WCH bR S S 15-22-32 E • A RADOF 2790. 19 - FT - ARC DI ST. OP. 659 .24 FT T HRU A C/A OF
-1,4 TAP OF COMPOUND CU RV ATUR E TH A LG A CRV TO RGT -• ALG SD PLL LN - CTR OF WCH BRS- - •
S 01-5U-1 E A.. RA U....OR. 1102.4b AN-A RC--D 1ST- OF--807 .1 1-4:1 -1 HR U ----C/A Oh 41-50-46-TH -S 49-53-32 E-
A 1-6 SU PLL LN 167 .07 FT TN ALG CRV 10 RGT ALG SD PLL L.N A RAD OF 1B 29.78 PT - AN MC LAST OF
3 09.67 Fr THRU A C/ A OF 09-4 1-48 TH LEAVING SU PLL LN . S 40-11-44 E 126. 24 FT TAP ON S
LN OF EN RR R/W TH ALG A CRV TO LPT - ALG SD S LN - CTR WCi BRS N 49-48-16 E A RAD OF
_1.005..37-F-7-AN-. ARC-.D1S T-OE-549.4 U-A-.C/A-.OF-31--1719-TA P-OF„---I AN GE NT-ON-SD- S-- LN OF 8N .
RR R/W CONIC; ALG SD S LN • S 71-29-03 E . ALG A LN 50 FT S • OF C PLW EX IS TI NG SOUTHBOUND:.--...,
1 RA CK 826 .56 FT TU W LN OF SIR 1B-23-05 iM S 01-0 1-27 W 2 5. 99 FT ALG SD W LN T . •
N ots-15-00 N ALL.; 11 LN 0.F 650 •• FT OF SE 1 /4 OF SD SEC 13 A • DIST OF 2261. 41 FT TO AN ANGLE
71- Lt.J S fiNDRY.. 5._SD_REN.TON__I___SH_L DS N-33-07-25- W-1 54 TO-AN ANGLE- PT- -TH
N 27-21-32 E 38'1. 32 FT 10 AN ANGLE PT TM N 83-17-25 W 171 .1.7 FT TH S 4o-22-22 W 324.66 FT •.
TH S 72-37-52 W 76. 33 FT TO TPOB - LESS C/M RGTS • .. .
.. • . . .
. 7 •
• • . .
LA.)
•
•
•
•
. . ...__.._...._._............. ..__ . _ ......._.. . A_4
Chicago, Milwaukee, St. Paul & Pacific Railroad
Legal Dosc_i•:Dtion of P=onasrty To Be Sold.
• That portion of the southeast quarter and the southwest
quarter ter of Section 13, Township 23 North, Range 4 East,
ClIn
W. m. and: that portion or the southwest quarter . o'r Section 1
r, 3 T ^�c�n E'�s t 7 '' n g
1' 18, 1047a18!'iiT� 2J Ivor�h, ..�..._.ge 5 •.c....l., ��. w �.11 i:'Z ��
CDCounty ,Wa s.:ington described as follows : .
Nd" Beginning at the south quarter corner of said Section 13 ; i'
CD
co �' •� a N ° ° .'J " •i^ '10 9 e a)
Thence 00 58 8 alongthe North-South centerline of a
said Section 13 a distance of S84.84 feet to the southeast =t
corner of Tract t. 26 of Renton Shor e1amds Second Supplemental z
Maps, 1958, and the true point of beginning; d
Thence S 72°37° 52a W along the south boundary of said Tract S
26 a distance of 382.60 feet; o ,)
om
Thence N 70°546 02" W along the south boundary of said Tract co
26 a distance of 73.51 feet to the east line of the Charles 112
Brownell Donation Land Claim No. 41;; `t v _
,
Thence N 01°248 04" E along said eastline a distance of = o
950.58 feet to a line 35 feet southerly of and parallel 0"
with the centerline of the existing most southerly track F
or the Chicago, Milwaukee, (St. Paul & Pacific Railroad 1
• tracks; • a
T •
2
Thence along said line J5 - :: . 30� 4_er1� 0 : and parallel ,
with the centerline of the most southerly ly track, along a
curve to the right, the center of which bears S 15°2 2° 3 2" E 6
having a radius of 2,790.19 feet, an arc distance of , 659.24
feet through a central angle of 13°32°14" to a point. of
compound curve;
_,
Thence along a curve to the right, along said parallel line, • U
the center of which bears S 01°50618" E having a radius of
1,102.46 feet, an arc distance of 807.11 feet - through .
central angle of 41°56° 46" ;
Thence S 49°53 ° 32" E, along said parallel line, a distance T
, of 167.07 feet;
. Thence *.long a curve to the '"g1,'-, along said parallel line , --
•
•
•
'.t ;1.!i .ii •tom
r
•41•• Imo.• w•.:..... .�::,%L.
tiff. .,... I.. :
•
l
N is
•
0r.: '1
rJ C) 1) rCr >1 ty fa 0) 0) _ _..:....s
0� t0 U 0 :) Cd 0 •rl U 4-1 c, O O 44
rI r-i 0 tl 4 in 0 :) to ; 0 0) 0) 0) 0) 0)c51 CO _..
' •r" f;ri . :0 `' 0) to 0 t.0 to rd t) U U U ) �..- -•:..�
O i1 •-; . 0 r3 •.-i 4a - •Ii (d l0 11 t:i -ii v1 f-`• 1-i 0 ii 0
C.) !t t• (d 0 fra b1 Ul 4 .(+ C) 0 ,0 U) !-I (Si rd (Si CJ CJ
I.) ,{ . .4 r) 4) -!J i) •r1 rd •i) 4-3 P .1) d) • ;..__..� s... J
•i ) •i-I O .(; N OJ W .3 �-) :3 r U) u) 01 Ul Cl)
i;.1 '� p) i-1 tJl ;.� = •ri r , , 4 CV 4 '� C1
a t51 0 0 •r) vi •ri •ri •ri
0 rn ,3 !:, � C0 -� _ r1 � 0 (SirJ
rd 0 ,c+ 0 0 0 O N 0 co 0 td (11 ;J •ri 0 rJ J r(3• r0 r0 ri1 rd
- 0 ;-3 •r{ •ri .. •ri .C' 0 U) 0 bl r-1 0 i
ON rC 4 `• i 0) 0 co .5) rd . rtt rJ (Si Cd yr
�� r � � ) b
U 0 (j •1 N 0 01 C) .r i i) 1) ,0 r1
13 ti 014 0) r0 0 . 0 N .0 43 4-3 01 Cn �) + ti ?t >- ✓1 vt43 "
3 -ir -P 1_,J id r-t O 4-) 0 .0t,') 0) rd fa 'i !-i 4 IA4 I •
0 v` 'td 0 0) 0 0 N .0 r-1 0) 4i 0 t:-1 0 0 nl • (Si 0 rd 0 0 .
0) RS } N 4-I ✓ 0 A •r) O co r0 rt) nC1 r0 f i
r' '. ri 0 (d bb t'iI {) IA -U) 0) 0 .0 4.3 0 •!) U) 5 f# 4'
al
0 cU
,_i •,i CPI f� •r-i .0 0 U) r•) 00 a 0) U
O ri •rl N t:1 cii .4) ti i OJ 0 5.1 0 )) f. 0) 0 . 0 0 0r� 0 • 0 0
! ' , • 0 01 > 0 0 Pi 0) •ri C) F.; 0 •r•i to •r! co .11 ,.Q .1 r•-r 4) ) -r-I
0 - cis .r1 ;.; oh • r1 3 t..G 11 •0 U) r-I 0 rt 4) 01
5•
f! Ul ,t) • •ri tr1 -I-1 1-1 0) .0 a- 'l3 ••. r-•, :i 4 :: .C� 0)
• t , 0 . .30 (-i r-I • r-I 0) .0 .4' co .0 t 0 CO ,.) -P 0i
• dl
• I rd 0 0 rd i=1 ul •ri O) O � .0 .s1 •,� , r-Ir-IrJ O In 0
d' of N 0 .s- r-I,N .0 -) :� • !i 0 4 0 01 0 • 0 1. 0 1 0 t4�
-0 0) • ••: 4-i P1:� :i r--I CO 4J i 0 t.i C) f: ,,0 r- Ul I
43 51 0) :1 t.0 0 4 0 03 0 0 tl-i f i 0 ti4 0 f: tl-1 0 :) ;.)• 0 1I •ri .C. •. t:-I ri rd 0 0 4 t:-4 0 Cl 0 41 0 •1-1 % r0 0r0 0 'Cl r0 '0 .
t-i 0) !-I :) 0) 0 t!l -ri •ri -rrl •r! •r1 •r-1 •,i 51
1J 0 .-i •:� r t 0) •• 0) r-1 N (iS O N 0) M .c� U U) U .r 5•I 5)4'C3 rd 0 W 0 ri! (d CJ •ri �•
11 rd r-I CO U 0 Pi
i r) r-I 0 ? '4' f7 .1 r 10 0! rii .r. 0 Ii .0 • 0) 11 0 11 0 Pi 0 Pi 0 Cl) 0 c)
CO•
•
r i O 0 00 id O ..,-4 r0 ri U • -0 �- !•I ,-.4 U] �� C?) (Si 1 0 f]1
N U' r--I 4 s:;-I , -t31 : •P t($ f, 5:1 rd 1 r� cd a) ) b ) t.31 0 tip 0 1>>1 r-1 1-1 ) U
• ra r•1 •;) 0 :) .C? (.4 GI it C) N (Si 0 0 00 a r0 14 001 1 i r-I f-: r-1 11 • 0 11
r-. ON kJ (-Si 0 •rl ri fS 4-1 1-
J ) 0' 0 b144 'ri 0 r0l 51 0) 0 is 0 0 0 0 0 0
0 C'! !-i •r•i i) 0 f3 rd " 1 'CP tl-I U) Ul b1 :AO CS ri t3 tit Ci ri %I 2-1 f, ri r-I r-i !-I
:) CO ri r3 0 .t. P N r-I f; 0 •ri !1 i.) (f •1) 0) n1 0 r3 0 0 rJ CJ (Si rd
43
1 01){ Ili 0 01 0 H IA0 rJ (')0 IJ U) C) 4) r:
r) 1i •ri C) !-I !.i O 0 r-i .(1 ri 0 (1) C) C) 44 ri,- rA 0 03 N: 0 N C-1 ►~'-'- ram- rd C)
C) :) 'ZS cJ L4 '> rd CS r-1 f11 rd 41 CJ •- 0 (4 0) ,[; r] 0 0 0 !: = C'i 0 " 41
1.. !a .ri t� 0) C.) :) CO a -
�r4 0 0) (J 0 91 0 ,C1 0 0) 'r}1 0 'ri ON C; in 4-3 4) ii 0 ,r~ :) 0 in 0 N. 0 7. • to N N
. Cj U r) 4J rd U (J 4-i ,c. f; U) :! f+ 1n P •`- t'I •I U) 0 0 43 i) N •I) c•') :.) N cam) to 0'
• t') 0 :: 0 -5) •ri 0 0 •r1 • 0 c) " 0 •r i -3-1 . ;Is :•) f• •� . •. •. .. .1)
4) 0 rJ bl:) 4 ai U s ;J -I. CJ 0 :S In 0 1-4 0 U! r0 4 In 0 O 0 N V r-I •U 1- ii N 4•) N
,.{ Cl 0) Al •r-I Ii Cl) 4-i 1-1 U !-i -d f: 0) 01 ,-{ (Si r-I U) 0) DI 0 0) N 0) r-i 0 N 0) C 4-3.j{ '.1 1 •r I 0 •ri 01,0 C) r--I 0 •ri 0 -!.) 4-) •ri 00 r(j 13 r.) O tli O 0 O Ct) O 0) O (I) O 0
:-c CS 1-A > t:i rd 0 (2 is 4J 4•I r) 4) 4.1 C) 0 01 •ri b4 CO 0 t:•i Ct') 4-1 N t- M 4-i l0 4-1 N 0)
l0
j 0f4 0 t:i 0 0) Cl r3 Cy O 0 4 •'-i c0 rd 0) a) .r-1 r-1 C) VI N CO Cr° N 44
ti) !i 0 0 ti' rI t!i 0 00 0 1: Cl) 0 .!) 43 01 r-I =r) .I) '4' r--I N N
r-1 N f: cJ O i- -I-1 U to U 0 0) U T to % • to ',-.4in :G Oa ?Pir-1 01 l0 V) Ca
0) I J I • 4Ca r-I ri 0 r0 U tt-i 0 4.1 51 al 4 i rl N • • • • M •
U0)
! • (3 0) 0 ,Q •'i 0) 0 0 0 0) 0 0 0 00 l0 Cl)0) 5' N 0) r 1!) '-Si' )
i ' •
f. •) U 01 4 U i0 In {.i ,0 0 0 .0 00 00 •rt .1 0 N ;) 0 In U C33 U NU Cl 0 to
r-1 ,) a 4,) 0i1 -J 4 J) U. r 04) 4) ;3 r; 4JN U 0 ,- i !.I 0 C') 0 r , Cr) 0 is- .
Ui9 0) J) 4 U 0 O 1. 0 Uri P 0 01 0 •.i 0 0 O 0 0) 0 rJ r) r•) 0) 0 0) F.
0 CJ C) SI t:i 0 4 0 '0) 0 .0 0 4-1 c1 •ri 0 cJ t: U 0 O 0 0) 11-I 1.1 0 11-1 4 1'.i t: •ii 0 ':i r.1 11-1 !t
• 1.1 Q
, 111 ,r-1 0 l E-i O r1 O W [-1 0 U) 0 . EA 4ifa C t 1 "IArn C)) C+ t:10 r.•1 1 0 CA 0 f 1 0 C i 0 ---1 0 •
• )
• . .
HANSEN JOHN R INC • •
LINT S-P-0 I-NT--RD . •
• BELLEVUE WA dIFooi
• • . . • . . . .
•. . ••
ST_.- -R - ___T OT...9 0 24_____PO.R:_OF__S.E.-1/4 ..& SW 1/4- 0 TR-13-23-0 4-D A F. B E G-AT.-S--..1/4-
CDR OF SU SEC 13TH-N 00-58 -28 E ALG N/ S C/L OF SD SEC 13 A DIST- . OF 884.84 FT TO SE CUR OF TR 20
R EN1ON SH°KELM DS 2ND SUP L G. • IPOB TH S 72-37-52 W ALG S SWAY . OF SO TR 26 A olST OF 382 .60 FT
Th 11 70-5 4-02 W ALG S iIJRY OF SD 1R 2o A DIST OF 73.51 FT . TO E LN OF CMAS BROwNELL DC
ALG s 58--F-T-TO-A-LN-3 5- FT-S F-C - PLW -C/L. 0 F-.M 0 ST SLY--T R
OF C M ST P & P RR IRS TH AL( •_ SD LN 35 FT SLY OF & PLW C/L OF • SD MOST SLY TR ALG CRV TO • RGT•
Cm OF WC H bRS S 15-22-32 E - !:.• A RAD OF 2790. 19 FT - ARC DI ST• OF.' 659 .24- FT T ii•RU A C/A OF
1 3-32-14 TAP OF COMPOUND .CU RV ATUR E TH AUG A CRV TO RGT -• •• ALG SD PLL LN - C TR OF WC 1-1 BR S •-
s -18_E . A.. kAU OF 110 2.46.. AN-A R(.:-.D 1ST.. OF-807 .11-F1 -1 HR U • C/A-0 F 41-5 0-46.-TH ..S 49-53-32 E
AU, SD pLi. LN 167 .07 FT -TH ALG .CRV TU RGT ALG SD PLL 1..!1 A RAD OF 18 29.78 FT - AN MC DI S T OF
3 09.67 FT THRU A C/ A OF U9-41-48 TH LE AV ING SU PLL LN . 5 40-11-44 E 126.24 FT TAP ON S
LN OF LN RR R/W TH ALG A CRV TO L F•T - ALG SD S LN - CTR W CH B RS N 49-48-16 E A RAD OF
OF-31--171.9 T AN GENT-ON-SD- S.•LN OF 13N
RR R/W ill CONIC; ALG SD S LN •••S 71-29-03 E . ALG A LN 50 FT S . .. OF C PLW EXISTING SC.).UTHBOUND ..
TRACK 826 .56 FT TU W LN OF • .• •SIR 18-23-05 T H S 01-0 1-27 W -•• 25. 99 FT ALG SD W L11 T H
N cits-15-(7 0 W ALb 11 LN 0F 65 0 FT OF SE 1 /4 OF SO SEC 13 A DIST CA: 2261. 41 FT TO AN ANGLE
P.T S . NDRY.. 5__SD_RENION_L_SH_.L DS_T_H N-33-07-25- W-1 ,54 TO-AN- AN GL E- PT-TH
N 27-21-32 E 387. 32 FT TO AN AN GI_ PT TH N 83-17-25 W 171 .17 • FT TH . S 4-6-22-22 W 324.66 FT . •
TH S 72-37-52 W 76. 33 FT TO TPOB LE SS C/M RGTS • :• • . . • . . •••
• • . .
. . . • • • . ;. .
•
•
. - _. .
• 4..
A-7 f;•%. ,. ,.,..7 . .., . ..,
.. if .. _
•
,,,-:. „,,.... ,Ii• „,• . ,cz4• • . .
I.; .. . .. i „,
.•...:., . •..• ....• . , ........._..
. . •i: ,. :., , . .. . ... - ....•••• ,. ....• 1
. ---::...._ : i 7- .., .. .: ' . • - N
1
. / / •,,c / .. .e,. ..___. _• ..
. ,•:,, _,:,,..
, ... •.. m.5.....w.,.. ... •; 4::1.,..7 4 i'''s .: ' . ' 174
• ••' :. , Pa . •. • .tA, 11 i ._ . ., . . •,;,. A • , 7 . 1
. .
, • •. . ./^ b "W.,. ,/. X 1 11 : I.
• .. .
_-.--._•
....••
".•..,..•....
\/\)\(li k•\.t/•...44//.N1r...1'/.."•.••••:.s;.-k...-"I.-1,1•':.7N...s'•ir,',4..4''._•,1‘•s-Y?..1.'!,.-?/'.•7..„...%....•//;"•,./.!'--4—•-/,7.1..:.1'.•
,•...!.••••h2.."-..:.-:..II.-•...".':!/.&1.I:i.7.•
1
1:.•'"S it•
. ; A I 1 • ,
. • .,- •. . •t . . 1.4 I. .0..
/ \ •‘, "'5; .." • ' •;.:, ' - •.,
.
/• /. ••,'' .- • •
7‹/..,...-.\•''.\•'N\.,,.t,.-,,‘••/\'A:-•...,•/"•.•'..','-..:'.:.••i ...•;,: ^.--0;.:.!-•.••. ,
"
- VA I : 1
'.-.•"•.•
•.
.'
•
. . .-•.y• c,
• I
, •/:•.A •;. .• --.... .i. ,.
,•,,.. •
..
• •••<C./ \
I.. ..,..
• •-.••
••••-.....„ p•, ' - / ,,,,.? \ • • .1 ••.• •
/ ...•-•
-- .• A.m. •••••.
-•':•' lc,
•
. ' itl • -----:-1- j. 1 N \ .I i .
i .
-.........flit . •I\fi Q,.\\.). .s .:-i
:;F, , 1 •4
r. .\ - • i
-_..
—... ,i •
r::.I I %---i,......Lk. • _
•
Mi.!. - . • • , .
---,-.....,
•, •
- - -,•iiii:i'l .. 1 .i i • ;11 • ••• - .
In. N..I 1. 1 1 • - •
‘,,_ , . , .4..\ „/ 1 . •
. •
•
0. • •._ .
tl'f•, , 1 , ./
. .
--- --.11V,I. • .. , • • .i
..: 1,, - % ••• •• • •IX . .•\".:!*. /It t Al .
k.,.....:.. • •.... • ).
----„,„......1.1 .:. ••• `.
• •,
', V..f.. •
•;.,,• ......• .
, • , %\•- N• ,-- \ \
, , 1, •,•:•:...:•.,\! , 0 •
. , • '----*`------i\VI-••••'c_ . '-5--7'• . I ...:
,-", ..,- ; '.'j\..-•:)1. : r . . . •
• ..----\‘‘‘,Ns., ‘t‘,6",,P I ,.. '. 7....,,...%"...."7".""•••..................• 1
.A.:.•sr .,'. '.-.4 ! (N . .,---- .7-----.----.1
\-- • ,‘•
..‘•
‘sx::.: . •••••••:-
l'
\*:•-.\:.e.f.;)..,.\\/, ).)1 I
\'14
i• 4
•
.
i
. .
, ------7 . ;.,,,,-x% -,...t.,,..lti•-1-- .- ii .)\:. • •-•(‘ . - ,i
,...,, •
.,....-, ;,‘, .•. ,/,ir .
.....__./- .
..•
,-- ;_.;,,„.. •
. ,....- •A. . ,, :1 -0 . . ..
;- ..
. .• .:j-/j";::,•- 1,1 \\*.k
I-
, • .:,.•1/2 I
' • .i•k•:
1 •
- I41 --------.pi ' ,-, •-, y \ ‘ "• . 'i
---- 1, •,, I i -
,., I .i
•• ,1 1 • 1
. 1 \ .. -`'.?:',1V ''.--• 'L ' ... :=,';'''' ''c 1
. ..
L\ \ ''''''''':"."...I.C.i‘:,"•.47;i 7/1/il.'":"!"://.:V-11-2• ‘1----1friro-, -^:'.. -. '\\\ -...." . . - '
. ....r, \ •, ; . \\I".4
. .. . , \ .„......„, . 0\ .., •
, .
.i. ...!'"1 \ ,. -!..-. -- ‘ l• x ‘. .
Ja 1.2. \ ‘,,rr',..%.7",'.'- .jc.9)ta. .i''''" •s.
. •
2 , ..'•‘,...•'-,.--,'" <r,..,10.**‘ ose.• .... I •
.pe'
6,...........".117:311 ,
--,
4 „Ts
e r '1)., ---• -----1:Arie• i'll •i i'cil._-7:-.3•-• •- . _ •
. : . . ..
Appendix B
RITTENHOUSE-ZEMAN & ASSOCIATES, INC.
GEOLOGY & SOILS ENGINEERING
13837 N.E.8th Street,Bellevue,Washington 98005 (206)746-8020
8050 S.W.Cirrus Drive, Beaverton,Oregon 97005 (503)644-9141
28 December 1979 W-3220
Mr. John R. Hanson
P.O. Box 808 i
Bellevue, Washington 98009
Subject: Preliminary Soils Exploration
Proposed Black River Industrial Park
Renton, Washington
Gentlemen:
In accordance with your request ,we have completed a preliminary soils
exploration of the Milwaukee Road property adjacent to Monster Road and the
Black River. This report includes the results of our work to date, and pre-
sents our comments and recommendations pertinent to future development of the
site. 1 j
.
( We understand that this heavily wooded parcel may be developed as a
warehouse-industrial park, and that our work .is to assess overall soil condi-
tions in a preliminary way to provide a basis for planning. More detailed
investigations will be necessary once plans have been formalized, in order to
determine specific soil bearing capacities, settlement characteristics, wall
pressures, etc. Building layouts, site grades and drainage plans are not as
yet available. -
j
?
B-2
Mr. John R. Hanson Page Two
28 December 1979 W-3220
SITE CONDITIONS
Our investigation of the site consisted of excavating eleven test pits
to depths of approximately 12 feet, using a tractor mounted backhoe. The pits
allowed for direct visual evaluation of subsurface conditions including the various
soil horizons and water seepages. The Test Pit Logs and a Site Plan showing their
approximate location is included in the Appendix of this report.
In general , our Test Pits show the site to be underlain by two soil types.
The surficial soil is a soft, water saturated, grey, mottled brown, fine sandy
silt, with interbedded layers of silty fine sand. This horizon varies from 5 to
12 feet in thickness. The lower stratum is a loose to medium dense, water saturated,
grey-blue, slightly silty fine sand. These soils are probably flood deposits from
the Black River. Drainage across this property is very poor as evidenced by areas
of surface ponding and heavy groundwater seepage within 4 feet of the surface.
Along the southern edge of the railroad tracks a large quantity of
uncontrolled fill has been placed. This fill is as much as 12 feet thick in
some areas and contains large pieces of concrete, steel , and wood, along with
saturated grey, clayey silts and sands.
DESIGN CONSIDERATIONS
I. General
The soft silts, loose sands and uncontrolled fill encountered in our
test pits are not presently suitable for support of conventional spread or
continuous footings, without some remedial action. These materials are very low
in strength and are highly compressible under conventional foundation loadings.
One possible method of dealing with these soils is to utilize a preload or
surcharge fill . This surcharge fill would increase allowable soil bearing
pressures and cause the majority of the expected settlements to occur before
construction begins. A second alternative would be to utilize a pile supported
foundation and if necessary a pile supported floor slab. An extensive surface
B-3
Mr. John R. Hanson Page Three
28 December 1979 W-3220
and groundwater drainage system will also probably be necessary in some areas
of the site
The fill being constructed on the property includes saturated sandy silt
ti
with concrete slabs, debris and trash. This fill is on the order of 10 to 12
feet in depth. It will be subject to large scale settlements, both total and
differential , for many years. This fill will also be difficult, if not
impossible to drive piling through, because of the concrete and debris, it
contains. Such fill can be marginally adequate for parking lots, however,
installation of underground utilities through such material is difficult, at
best.
II. Preload or Surcharge Filling
The use of a preload surcharge fill is recommended on the site to raise
grade and to reduce the amount of anticipated post construction settlement.
Generally, preloading does not eliminate all long term settlement, but places
settlements within a more acceptable range. Since a portion of the soils
beneath the site consists of soft silts and loose sands, settlements will occur
over a long period of time and it does not appear feasible to eliminate all
settlement within the lifespan of the proposed buildings.
With any preloading program, the amount of post construction settlement
to be expected depends on several factors, including the following: 1) height
of preload; 2) time of preloading; 3) subsurface soil characteristics; 4) anti- r-
cipated building and site loads. Ideally, a preload should be considerably
heavier than any anticipated long term site load and left in place for an
extended time period. Within limits, the greater the preload intensity, the
less time is required. We would anticipate a loading time on the order of 4 to
6 months for this specific site. However, this must be determined on the basis
of deeper test borings. It is essential to the successful performance of the
structures that the imported surcharge fill consist of a free draining, clean
material capable of being compacted over a wide range of climatic conditions.
J'T
B-4
Mr. John R. Hanson Page Four
28 December 1979 W-3220
For wet weather work, the soil should generally contain less than 5% fines by
weight passing the Number 200 sieve, with the percentage being based on that
portion passing the Number 4 sieve. The maximum allowable particle size should
be taken as 6 inches. Where building pads are preloaded, this granular fill
should cover the entire area of the structure. The granular fill , which will
remain below floor elevation should be compacted to at least 90 percent density,
based on ASTM:D-1557 (AASHTO:T-180) . Once specific building and locations are
set, detailed soil studies will be necessary to establish final preload dimen-
sions, depths and durations, as well as anticipated settlements .
III. Pile Foundations
Structures may also be pile supported. Piles have the advantage of
negligible post construction settlement. The economic feasibility of piling will
depend upon the anticipated building loads and the depth of pile penetration
required. It should also be realized that piles might not be successfully
driven or bored through appreciable thicknesses of fill containing concrete or
other obstructions. A more detailed soils investigation utilizing test borings
and laboratory testing will be necessary prior to design of a pile supported
foundation system. For estimating purposes, timber piles may be capable of
supporting design loads on the order of 10 to 20 tons each. Higher loads can
be carried by Augercast concrete piles.
IV. Site Preparation
If a preload surcharge fill is chosen, clearing of this site should be
limited to the woody, above ground vegetation, and debris. Grass and sod should
not be removed from the areas to be filled since doing so would cause disturbance
of the underlying soils. Silty soils such as those encountered on the site are
extremely susceptible to disturbance when wet. Therefore, we do not recommend
any site stripping or construction of compacted fills during wet or even margi-
nal weather. If wet weather grading must be performed, the fill should consist
of clean sands or gravels.
B-5
Mr. John R. Hanson Page Five
28 December 1979 W-3220
In summary, the soils encountered on the site are typical of those
• encountered throughout the Kent Valley. They consist of loose sands and silts
which are subject to settlement. Remedial measures required on this site are
also typical of the surrounding industrial areas; the site will likely have to
be surcharged and/or the structures pile supported. —�
We appreciate this opportunity to assist you. If you should have any
questions, please do not hesitate to call .
• Respectfully submitted,
. RITTENHOUSE-ZEMAN & ASSOCIATES, INC.
44;<...e
R
. . st% R. 1 41,
Q.� o4 was/04,44✓ Crai LaVielle, Geological Engineer l•
S'7ONAL E . .
Alvin R. Zeman, P. l f
•
•
•
L
' R. S' IR
, • -\
\----- - --. .-- . --• 1 - . , . _, • , .
,_ . ,
•
_______.
- ,_ , W, , 2.,.
proposed roe .
------ . TPI
- -- - ® TP-10 L1 .1.—_ - rTPII .� S
TP 2
j ®TP3
-
•
,
- - TP4 TP- 8 �
in TP-
1 TP. 9/1 - -, NITP• ®TP•6 I
Black fiver _ - --
it
RITTENHOUSE - ZEMAN & ASSOC., INC.
FOUNDATION AND SOILS ENGINEERING,GEOLOGY
MON STER R D. Is INDICATES NUMBER
13837 N.E. Bth Street 8050 S.W.Cirrus Drive
Bellevue,Washington 98005 Beaverton,Oregon 97005
AND LOCATION 748-8020 644-91 4,
HANSON : MILWAUKEE RD. PROPERTY
OF TEST PITS
W.O.,, 3 al 0 DATE /a- ?
BY e & et1 SCALE l - oloor
}
B-7
APPENDIX A
TEST PIT LOGS
B-8
W-3220
TEST PIT LOGS
Depth (Feet) Soils Classification
Test Pit No. 1
0.0 - 12.0 Soft, saturated, grey mottled brown, fine sandy silt.
Heavy seepage at 3.5 feet.
Test Pit No. 2
0.0 - 7.0 Medium stiff, saturated, grey mottled brown, fine sandy silt.
7.0 - 12.0 Loose, saturated, grey-blue, slightly silty fine sand.
Heavy seepage at 3.0 feet.
Test Pit No. 3
0.0 - 5.0 Soft, saturated, grey mottled brown, fine sandy silt.
5.0 - 11.0 Loose, saturated, grey-blue, slightly silty fine sand.
Heavy seepage at 2.5 feet.
Test Pit No. 4
0.0 3.0 Medium dense, saturated, grey mottled brown, silty fine sand.
3.0 - 5.0 Soft, saturated, grey mottled brown, fine sandy silt with organics.
5.0 - 11 .0 Loose, saturated, grey-blue, slightly silty fine sand.
Heavy seepage at 3.0 feet.
Test Pit No. 5
J
0.0 - 7.0 Medium stiff, saturated, grey mottled brown, silty find sand.
7.0 - 11 .0 Loose, saturated, grey, slightly silty fine sand.
Moderate seepage at 10.0 feet.
B-9
W-3220
Page Two
TEST PIT LOGS
Depth (Feet) Soils Classification
Test Pit No. 6
0.0 - 8.0 Soft, saturated, grey mottled brown, fine sandy silt with
coarse sand layers interbedded.
Heavy seepage at 5.0 feet.
Test Pit No. 7
0.0 - 5.0 Soft, saturated, grey mottled brown, fine sandy silt.
5.0 - 8.0 Loose, saturated, grey slightly silty fine sand.
Moderate seepage at 4.0 feet.
Test Pit No. 8
0.0 - 7.0 Soft, saturated, grey mottled brown, fine sandy silt.
7.0 - 11.0 Loose, saturated, grey slightly silty fine sand.
Moderate seepage at 6.0 feet.
Test Pit No. 9
0.0 - 9.0 Soft, saturated, grey mottled brown, fine sandy silt.
9.0 - 11.0 Loose, saturated, grey, slightly silty fine sand.
Test Pit No. 10
0.0 - 6.0 Medium dense, moist, brown mottled, silty fine sand.
6.0 - 12.0 Soft to medium stiff, saturated, grey mottled brown, fine sandy silt.
No seepage observed.
B-10
W-3220
Page Three
1
TEST PIT LOGS
Depth (Feet) Soils Classification I
Test Pit No. 11
1
0.0 - 8.0 Medium stiff, moist, grey mottled brown fine sandy silt.
8.0 - 10.0 Loose to medium dense, moist, grey silty fine sand.
No seepage observed.
1
I
I
I
1
I
Appendix C
BLACK RIVER INDUSTRIAL PARK
VEGETATION AND BIRD REPORT
The site covers a major portion of the Black River floodplain. The river, which
once connected Lake Washington to the Duwamish River, was cut off from its source
when the level of the lake dropped after the opening of the Lake Washington
Ship Canal in 1916. Since then, only a slow, narrow stream has flowed through
the south edge of the floodplain in an old channel, while the remainder has
grown up into a wetland deciduous forest. This kind of vegetation is never
particularly common and such a large and well-developed area of it is rare in
the Seattle area. Enhancing its importance to wildlife are the golfcourse to
the south and the wooded hillside to the north, providing together a rich var-
iety of habitats.
Nearly all the soils on the site are moist to wet throughout the year, with
large areas of seasonal ponding. Vegetation is extremely dense, 70% to 80% for-
est, entirely deciduous.
Plant Communities
Following are the major plant associations seen on the site:
1. Ash-Cottonwood. Heavy stands of Oregon ash (Fraxinus latifolia) and black
cottonwood (Populus trichocarpa) with average crown heights of 15 to 20
meters and scattered specimens to 40 meters (cottonwood) . Less common are
red alder (Alnus rubra) and willows (Salix spp.) . The understory is sparse
to very dense with major species being red elderberry (Sambucus callicarpa) ,
red-osier (Cornus stolonifera) , nettle (Urtica lyallii) , nightshade (Solarium
dulcamara) , and creeping buttercup (Ranunculus repens) . Reproduction in
the understory is almost exclusively cottonwood and ash, indicating that
this zone is at a climax stage. The largest cottonwoods (40m x 2m) are de-
clining and dying, with young ash and cottonwood soon filling the voids.
The largest ash, also declining, are up to 30m x 1.8m.
2. Cottonwood. Large parts of the site contain these thick, "pole-timber"
stands of cottonwood. The trees are very close, straight and mostly 10
to 18 meters tall. The understory is very sparse, mostly herbaceous, con-
sisting mainly of Himalayan blackberry (Rubus discolor) , nettle (Urtica
lyallii) , baldhip rose (Rosa gymnocarpa) , red-osier (Cornus stolonifera) ,
creeping buttercup (Ranunculus repens) , canary grass (Phalaris arundinacea) ,
and nightshade (Solanum dulcamara) .
This community is undoubtedly progressing to a version of the previous ve-
getation.
3. Cottonwood-willow. Where there is considerable winter ponding, the cotton-
wood community becomes a mixture of cottonwood (20 to 35 meters) and willows
(mostly Salix sitchensis and S. lasiandra to 25 meters) with red-osier
(Cornus stolonifera) , Himalayan blackberry (Rubus discolor) and hawthorn
(Crataegus oxyacantha) . Because of the seasonal water fluctuations, this
is probably the climax vegetation for these spots.
C-1
4. Willow groves. These are pure stands of willow, almost entirely Pacific
willow (Salix lasiandra) and Sitka willow (S. sitchensis) up to 30 meters
tall. The understory is similar to the previous one, with the addition of
hardhack (Spiraea douglasii) . There is standing water during the winter on
part of this community. This vegetation is probably at a climax for such
conditions, though it may eventually become a cottonwood-willow mix.
5. Willow savanna. The climax growth on very wet soils here is usually this
sheet of hacdiack (Spiraea douglasii) with scattered willows (mostly Salix
sitchensis) . Additional species here are red-osier (Cornus stolonifera) and-
some other shrubby willows.
6. Alder. On soils that are never saturated or flooded, the forest composition
favors alder (Alnus rubra) with otherwise the same understory as in the cot-
tonwood zone. Much of this zone will remain in an alder grove; some of it
could eventually contain western red cedar (Thuja plicata) -but no repro-
duction of that species is occuring there yet.
7. Blackberries. Large areas of the site are covered with the introduced
Himalayan blackberry (Rubus discolor) with occasional islands of hawthorn
(Crataegus oxyacantha) . The heavy, unyielding nature of the blackberry
growth virtually eliminates the possibility of any further progression in
the vegetation in this community. The blackberry is still spreading into
the more open, less shaded parts of other zones, though most of the older.
forest should remain free of it.
8. Knotweed. A common knotweed (Polygonum lapathifolium) has formed one-
species layers on flat, seasonally ponding depressions on the site, espec-
ially along the course of the stream. Many of these may ultimately fill in
with spiraea, willow and similar plants from surrounding communities..
9. Grass-herb. Some drier soils, mostly on the east and west ends of the site,
are covered with grasses and herbs because of recent or continuing disturb-
ance. This is also the major vegetation along with streambanks, where it is
being actively invaded by red alder (Alnus rubra to 8 meters) . In the ab-
sence of further human activity, such alder invasion can be expected on all
of this community except on the railroad embankment.
Effects of the Proposed Development:
Plant Community
The flora survey of the site, resulting in the plant list in this report, re-
vealed no rare or endangered species. The community as a whole is unusual in
composition and maturity. As a climax stand, the larger portion of the site
contains few opportunities for invasion by new and unusual plants. The other
parts of the site present no unique habitats for rare plants, though parts of
the stream edge have encouraged the development of special communities. Though
the site is larger and less disturbed than most wetlands in the region, it is
less varied botanically than its overall appearance would suggest. Further, it
is being actively encroached upon by introduced species -- i.e. Himalayan black-
berry -- which threaten to reduce the variations further.
C-2
The fact that this is probably the last and largest old-growth riparian stand in
the Seattle area makes it uniquely valuable as a biological (and historical)
resource. Only retention of the entire ash-cottonwood grove can ensure the
value and integrity of this remnant forest, which is part of the vegetation
which once covered most of the valley bottoms in the region. The stands of old
growth ash and very large Pacific willow are particularly unusual for both size
and number of individuals.
Should partial development occur, the remaining vegetation would be effected in
the following ways:
Soil compaction. The trees of this community are all shallow-rooted and not
tolerant of soil compaction from heavy traffic or paving. Most would tol-
erate a heavy layer of crushed rock and light traffic, but any heavier use
of the soils would cause a gradual loss of trees.
Drainage changes. The present vegetation depends on a high water table as
well as seasonal flooding on poorly drained soils. Any addition of surface
runoff into the forest will cause a gradual change in forest composition; a
severe increase in flooding will kill some species. A decrease in drainage
into the site will be equally serious. The vegetation along the stream is
totally dependent on water and any impediment to stream flow would elimin-
ate many individual plants and perhaps certain species altogether.
Clearing, Thinning. Any areas in which only scattered trees are left will
subject those trees to wind damage. For the kinds of trees on this site,
this would be mostly loss of limbs. It should be noted that all of the
trees found on the site offer serious branch-dropping hazards, as they de-
teriorate badly in age (there is a great accumulation of downed trees and
major limbs in the forest there now) . The exposure of any undisturbed for-
est to the full sun and wind would also cause some loss along the southern
edges. Further, the sun and wind would accelerate evaporation, leading to
losses of some more water-dependent species.
Air pollution. Few of the woody species here are particularly sensitive to
air pollution. Probably some of the more delicate herbaceous species would
react to it, but little data is available.
Irrigation, herbicides, fertilizers. Cultivation of ornamentals should have
negligible effects of the native vegetation, though some loss of annual and
perennial species could be expected immediately around areas of herbicide
use. Extensive use of herbicides would be of some concern if they are sub-
ject to drifting or introduction into surface water. Again, there is in-
• sufficient data on chemical reactions for these species.
C-3
Plant List
The plant list was compiled after six on-foot surveys of the site. Uncertain
species were collected and checked in Flora of the Pacific Northwest, by C. L.
Hitchcock.
R = rare throughout its range
r = rare on this site
x = non-native but established
C = very common
o = less common/sporadic
Trees
o Alnus rubra/red alder
o Acer macrophyllum/bigleaf maple
C Crataegus oxyacantha/English hawthorn
C Fraxinus latifolia/Oregon ash
o Malus fusca/Oregon crabapple
C Populus trichocarpa/black cottonwood
C Salix lasiandra/Pacific willow
o S. scouleriana/Scouler's willow
C S. sitchensis/Sitka willow
•
Shrubs e
C Athyrium flix-foemina/lady fern
o Buddleia davidii/butterfly bush 111
C Cornus stolonifera/red-osier
o Corylus cornuta californica/hazelnut
o Oemleria cerasiformis/Indian plum
✓ Physocarpus capitatus/ninebark
o Ribes divaricatum/straggly currant
✓ R. lacustre/swamp currant I
o Rosa canina/dog rose
C R. gymnocarpa/little wild rose
C Rubus discolor/Himalayan blackberry
C R. lacinatus/evergreen blackberry
C-4
Plant List Continued
•
o R. leucodermis/blackcap
C R. spectabilis/salmonberry
C R. ursinus/dewberry
o Salix pedicellaris/bog willow
C Sambucus callicarpa/red elderberry
C Solanum dulcamara/nightshade •
C Spiraea douglasii/hardhack
C Symphoricarpos albus/snowberry
Herbs .
C Agropyron caninum/broadleaf wheatgrass
C Agrostis sp./bentgrass
o Alisma plantago-aquatica/water-plantain
C Amaranthus albus/tumbleweed
C A. powellii/Powell's amaranth
C A. retroflexus/pigweed
o Anaphalis margaritacea/pearly everlasting
o Anthemis cotula/stinking mayweed
o Artemesia vulgaris/mugwort
o Bidens vulgata/leafy beggar's-tick
o Cardamine pennsylvanica/Pennsylvania bittercress
o Carex obnupta/slough sedge
C Chenopodium album/pigweed
C C. murale/nettle-leaved goosefoot
C Cirsium arvense/Canada thistle
C C. edule/edible thistle
xr Conium maculatum/poison hemlock
o Conyza canadensis/horseweed
xr Daucus carota/wild carrot
o Epilobium angustifolium/fireweed
o E. glandulosum/swamp willow-herb
o Equisetum sp./horsetail
r Eurotia lanata/winter sage
C Gallium asperrimum/rough bedstraw
o Glecoma hederacea/ground ivy
o Gnaphalium uliginosum/marsh codweed
r Glycera elata/tall manna grass.
o Heracleum lanatum/cow parsnip
C Hypericum perforatum/Klamath weed
C-5
Plant List Continued
C Juncus effusus/common rush
C J. drummondii/Drummond's rush
. o Lathyrus latifolius/perennial sweetpea •
o Leersia oryzoides/cutgrass
xr Lobelia erinus/lobelia
C Lycopus uniflorus/northern bugleweed
o Lysimachia nummularia/creeping Jenny
o Medicago hispida/bur clover
o Melilotus alba/white sweet clover
✓ Mimulus dentatus/toothed-leaf monkey flower
✓ Osmorhiza chiloensis/sweet root
• r Phalaris arundinacea/reed canary grass
C Plantago lanceolata/narrowleaf plantain
C P. major/broadleaf plantain
xr Polygonum campanulatum
C P. hydropiperoides/water pepper
C P. lapathifolium/willow weed,
C Polypodium glycirrhiza/licorice fern
o Rorippa islandica/marsh yellowcress
o Rumex crispus/narrow-leaved dock
o R. maritimus/seaside dock
o R. sanguineus red-veined dock
o Scotellaria galericulata/marsh skullcap
o S. alteriflora/blue skullcap
o Senecio vulgaris/common groundsel
• i
o Setaria lutescens/yellow foxtail grass
o Solanum nigram/black nightshade
o Sonchus asper/sow thistle
o Spergularia sp./sandspurry
. o Stellaria media/chickweed
C Taraxacum officinale/dandelion
C Tolmiea menziessii/piggyback plant
o Triticum sp./wheat
o Typha latifolia/cattail
C Urtica lyallii/stinging nettle
o Verbascum thaspus/mullein
C Veronica americana/American brooklime
o V. biloba/bilobed speedwell
o V. scutellata/marsh speedwell
C-6
Effects of the Development on Birds
The site is rather special in providing a wet-land deciduous forest habitat, an
uncommon feature in the Seattle area. The extent of the site and its largely
wooded surroundings would suggest a long bird list, though six site visits
showed a relative scarcity of wildlife in general. . . though the time of year
(September) was probably a factor since previous surveys (May) found much lar-
ger numbers and kinds of birds.
There may be several other reasons for the lower wildlife population seen here.
First, there is no large body of water, although the stream does attract some
waterfowl. Second, there are no evergreen trees or shrubs, something needed by
many birds and easily found elsewhere. Third, the site is relatively narrow,
with railroad activity on one side, the golfcourse and industrial development
only a few hundred yards away. This narrowness dilutes the large size of the
site. Fourth, the site is rather isolated from other similar vegetation commun-
ities. Many birds will find little reason to move to this site from larger de-
ciduous forest networks east of Lake Washington and in Pierce County. Of these,
the last two conditions have been accentuated in the years since the 1974 study.
Increased construction, traffic and noise on all sides have undoubtedly caused
a deterioration of the site's wildlife capacity.
The most positive aspects of the site for wildlife are its maturity (in parts)
and the major role it fills in the total wooded and open space network between
Monster Road, the Earlington Golfcourse and Empire Way. From those character-
istics, it is safe to assume that many birds at least occasionally visit the
site, and nest or pass through the entire area because of its total extent.
Thus the removal or compromise of the Black River site could well discourage
many bird species from using the area in general. The bird list, while specific
to the site in question, assumes the continued presence of at least some of the
surrounding vegetation.
The list of rrnutals, reptiles and amphibians are taken from the 1974 Wilsey and
Ham report and annotated to show current abundance of the species. These are
estimates based on the habitat deterioration of the area since 1974.
Regardless of the environmental degradation around the site, this tract of wet-
land remains for both wildlife and plants an especially large, mature and varied
habitat, considering its urban location. As such, it is one of the only habi-
tats
suitable for certain species in the Seattle metropolitan area.
C-7
Bird List
This list of birds probable for the Black River site was compiled from the fol-
lowing sources:
Jewett, Stanley G. , Birds of Washington.
Peterson, Roger Tory, Field Guide to Western Birds.
This list contains all the birds entering the area for which suitable habitat
exists on the site.
C = common in the region
c = probably common on the site, at least at certain seasons
R = rare in the region
r = probably rare on the site
X = observed on or near the site
o = birds which are most in need of this kind of habitat
ro Great Blue Heron
o American Bittern
XCc Canada Goose (on the golfcourse)
XCco Mallard •
ro Gadwall •
Co American Pintail
Co Green-winged Teal
o Blue Teal
o Cinnamon Teal
ro European Widgeon
o American Widgeon
Co Shoveler
o Wood Duck •
o Ring-neck Duck
o Canvasback
Co Greater Scaup
Co Goldeneye
o Bufflehead
o Northern Ruddy Duck
Co Hooded Merganser
o Common Merganser
r Turkey Vulture
C-8
Bird List Continued
ro Western Goshawk
o Sharpshinned Hawk
o Cooper Hawk
Co Red-tail Hawk
o Pigeon Hawk
XC Ruffled Grouse
Bobwhite
XCo California Quail
C Ring-neck Pheasant
C Coot
C Kildeer
XCo Band-tailed Pigeon
XCc Rock Dove
ro Screech Owl
ro Great Horned Owl
ro Pygmy Owl
o Saw-whet Owl
C Nighthawk
Black Swift
C Rufous Hummingbird
Belted Kingfisher
XCc Flicker
Pileated Woodpecker
XCo Lewis Woodpecker
o Yellow-bellied Sapsucker
Co Hairy Woodpecker
o Downy Woodpecker
C Western Kingbird
Cc Traill Flycatcher
XCc Western Flycatcher
C Olive-sided Flycatcher
C Violet-green swallow
Tree swallow
C Barn swallow
C Canada Jay
XCc Stellar's Jay
XCc Crow
C-9
Bird List Continued
XCc Black-capped Chickadee
XC Chesnut-back Chickadee
Bushtit
White-breasted Nuthatch. •
Red-breasted Nuthatch
C House Wren
XCc Winter Wren
Cc Bewick Wren
XCc Robin
Varied Thrush
Western Bluebird
o Townsend Solitaire
Cr Golden-crowned Kinglet
o Boehmian Waxwing
Co Cedar Waxwing
XCc Starling
Hutton's Vireo
Cassin Solitary Vireo
C Western Warbling Vireo
Orange-crowned Warbler
Yellow Warbler
Townsend Warbler
MacGillivray Warbler
Yellow-throat
Yellow-breasted Chat
C Pileolated Warbler
XCc House Sparrow
C Western Meadowlark
C Bullock Oriole
C Redwing Blackbird
Brewer Blackbird
R Cowbird
Western Tanager
o Evening Brosbeak
Purple Finch
1
XC House Finch
XC Goldfinch
XCco Oregon Towhee
XCc Slate-colored Junco
C-10
Bird List Continued
C Chipping Sparrow
XCc White-crowned Sparrow
C Golden-crowned Sparrow
C Fox Sparrow
XCc Song Sparrow
•
•
C-11
Mammals
Masked Shrew mod. rare
Marsh Shrew common •
Trowbridge's Shrew mod. rare
Vagrant Shrew common
Shrew-Mole common
Townsend's Mole mon. common
Coast Mole mod. rare
Lump-nosed Bat mod. rare
Silvery-haired Bat mod. rare
Hoary Bat mod. rare
Big Brown Bat mod. rare
Hairy-winged Brown Bat mod. rare
California Brown Bat mod. rare
Yuma Brown Bat mod. common
Long-eared Brown Bat mod. common
Eastern Cottontail Rabbit mod. common
Mountain Beaver mod. rare
Townsend's Chipmunk rare
Common Deer Mouse, mod. common
Bushy-tailed Wood Rat rare
Oregon Meadow Mouse common
Townsend's Meadow Mouse common
Muskrat mod. common
Norway Rat mod. common
Black Rat mod. rare
House Mouse mod. common
Pacific Jumping Mouse mod. common
Domestic Dogs common
Coyote rare
Red Fox rare
Raccoon mod. common
Long-tailed Weasel mod. common
Short-tailed Weasel mod. common
Spotted Skunk rare
C-12
•
Mammals Continued
Striped Skunk mod. rare
Domestic Cats rare
Black-tailed deer mod. rare
Reptiles and Amphibians
Northwestern Pond Turtle rare •
Northwestern Fence Lizard mod. common
Northern Alligator Lizard mod. rare
Pacific Rubber Boa mod. common
Puget Sound Garter Snake mod. common
Wandering Garter Snake common
Northwestern Garter Snake common
Northwestern Salamander mod. common
Rough-Skinned Newt mod. common
Western Red-backed Salamander mod, rare
Oregon Salamander mod. rare
Tailed Frog mod. rare
Western boreal Toad mod. common
Pacific Treefrog common
Northern Red-legged Frog mod. common •
Bullfrog mod. rare
,
C-13
Appendix D
1
_••"
STATE OF OFFICE OF ARCHAEOLOGY AND HISTORIC PRESERVATION
: .,f r' .",t ff WASHINGTON I;I Lk . 1'.t1•nry F:a1 A%etit.•.(11,,v1pi.i.W.r.hingl.,i: '.r=dtr1 •2116.m: 4011
�4 Dim/1PP Rely
Governor Date: July 31, 1980
Jon Potter In reply refer to: 155-C-KI-06
R. W. Thorpe & Assoc.
815 Seattle Tower Re: Black River Industrial Park
Seattle, WA 98101
Dear Applicant:
We have reviewed the project materials forwarded to us for the above project and
would like to make the following comments:
Insufficient information: We will need: a detailed narrative of the project
elements; a vicinity map; a map of the project site and surrounding area
showing topography, drainage, specific project boundaries, and indicating
County, Section, Township, and Range; _line drawings of the project; photo-
graphs of structures to be renovated or demolished.
No resources known: No properties are listed in the National or State Registers
of Historic Places or the State Inventory of Historic Places which may be
impacted by the project. Properties include archaeological and historic
resources.
Project area has/_has not been surveyed for cultural resources.
XX Potential effects on unidentified resources: There is reasonable probability that
cultural resources exist in the project areas. XXA cultural resources survey/
monitoring of the project area is recommended as part of project construction.
Resources present: no effect/ effect uncertain; see below for comment.
No adverse effect/ Adverse effect on National Register property. See below for
comment.
XX In the event that cultural materials are disclosed during construction, work in
the immediate vicinity should be discontinued and this office notified.
Sincerely,
JEANNE M. WELCH, Deputy State
Historic Preservation Officer
Sheila A. Stump, Archaeologist
and
Comments: Studies adjacent to the project site have revealed the presence of
significant archaeological sites. Although the entire location has
very high potential for archaeological sites, the eastern portion
is particularly sensitive. The project should be professionally
surveyed. •
D-1 •
UNIVERSITY OF WASHINGTON
SEATTLE,WASHINGTON 98195
December 11 , 1980
Institute for Environmental Studies
Office of Public Archaeology
Engineering Annex, FM-12
Mr. Del Bonds
P.O. Box 66101
Seattle, Washington 98166
RE: Archaeological Assessment of the Black River Industrial Park,
Renton, Washington, T23N/R4E/Section 13.
Dear Mr. Bonds:
In accordance with your request we have assessed the archaeological
potential of the property on which the Black River Industrial Park
is to be located. This parcel of land lies within the drainage of
the former Black River, which flowed from Lake Washington (prior to
1917 when the water level of the lake was lowered due to construc-
tion of the Montlake Cut and Hiram Chittenden Locks) meandered
southwest and drained into the Duwamish River.
Two archaeological sites have been discovered and excavated in the
area in the last three years. The Sba'badid site includes two loci
of cultural activity and is located just west of the Renton Shopping
Center. The two locations at Sba'badid have been interpreted by
the investigator as two historic Native American villages, probably
occupied by members of the Duwamish group of Indians. The older of
the two locations revealed the remains of at least one long house
approximately 30' x 75' in size. Early deposits here contained few
trade goods while in the later deposits trade goods were common.
On the basis of artifacts and subsistence remains, it is thought
that this location was probably occupied as a winter village in the
first years of the 19th century. The second location at Sba'badid
was occupied sometime later, possibly as late as 1865. Preservation
at both locations in Sba'badid was excellent due to the sealing
action of the silt and sand deposited by the Black River.
As you are aware, the Office of Public Archaeology conducted
archaeological assessment and testing of the proposed site of the
Earlington Industrial Park which will be located at the present
Earlington Golf Course. As the result of a systematic subsurface
coring project , a buried archaeological site was found at the north-
east extremity of the property. The portion of the site located
0 Recycled Paper
D-2
Mr. Del Bonds
December 11 , 1980
Page Two
•
within the boundaries of the Earlington Industrial Park was excavated
by a crew from the Office of Public Archaeology. The site is presently
interpreted as a seasonally reoccupied fishing camp which was probably
used before the time of the occupation of the two areas at Sba'badid.
Analysis is currently proceeding on the cultural remains taken from
the site. Our knowledge of the settlement patterns and subsistence
practices of groups occupying the Black River has been substantially
augmented by the archaeological studies at the two sites.
It should be noted however, the northern limits of the site on the
Earlington Golf Course have not been surely established. The possibil-
ity exists that the site (45K159) may extend into the property to be
occupied by the Black River Industrial Park. This possibility, coupled
with the fact that we are now aware of the existence or former exist-
ence
of several village sites in the general area and that local
Indians tended to move their villages often, lead us to believe that
the Black River Industrial Park property has a high potential for
cultural resources.
In order to test the property for possible archaeological sites, we
propose a subsurface coring program because past work in the area has
shown that aboriginal living surfaces tend to have been buried by
alluviation. Both the Sba'badid and the Earlington Golf Course sites
lay buried some depth beneath present ground surface, sealed in by I
the sands and silts deposited by the Black River. We would suggest
that coring be carried out in 25M intervals in areas judged to have
high archaeological potential and at 50M intervals in other undisturbed
areas. This would exclude coring along the old Columbia and Puget
Sound Railroad grade which bisects the property from east to west;
the present railroad tracks at the northern boundary of the property
since this area is covered with a large amount of fill ; and the
channel of the old Black River. These three areas would be excluded
from the coring program. Coring of the remaining area, should serve
to detect the existence of presently unknown archaeological resources
as well as delineate the northern boundary of 45KI59, the Earlington
Golf Course Site.
D-3
Mr. Del Bonds
December 11 , 1980
Page Three
I hope that this assessment and its associated recommendations will
prove adequate to your needs. Please contact me if you have
questions or comments.
Sincerely,
Joan M. Robinson
Staff Archaeologist
Hal Kennedy
Assistant Director
/
cc Robert W. Thorpe ✓
R.W. Thorpe 6, Associates
Jeanne Welch
Deputy SHPO
D-4
m
MEMORANDUM; .,.
FROM THE DESK OF , , , �(V'
1 December 4 , 1980
J I M MATTHEW a` ..... .-.._.._ '-
FIRE MARSHAL
TO: Gordon Y. Ericksen, Planning Director .:-
RE: Rough Draft - E.I .S. for Black River Industrial Park ,
My comments regarding the development of Black River Industrial Park are
based upon present capabilities of the fire department given the follow-
ing information.
1. Virtually the entire area is located outside the 11/2 mile service
radius of the fire departments ' first response engine company, and
2 mile service radius of the first response ladder company as re-
quired by the Survey and Rating Bureau standards.
2. The present statistics indicate that the amount of responses per
calendar year are increasing at a rate of 25% . Present crews are
working at or near capacity to maintain required drill and inspection
time.
3. Average response time for the area based on statistics gathered in
1979 is one minute over the minimum required under the guide lines I
of the Renton Fire Department Master Plan.
4. Plans for a future fire station located on Benson Hwy in the vacinity
of S.E. 170th will not improve the first response capabilities to
this development.
5. Accessibility of surrounding fire departments to the area is limited I
by a man-made and natural barriers; and is subject to inter-agency
agreements.
6. The typical type of occupants in this kind of development is of a I
high hazard classification either high piled stock or of a highly
flammable or hazardous nature requiring special fire protection considerations and increased intervals of inspection.
I
Based upon these considerations , further development of this area should
be limited until such time as improvements can be made to provide timely
first response capabilities.
I would refer you to the Renton Fire Station Location Study conducted in
1973. In it, under recommendations , it mentions considerations for a I
fire station located in the industrial area.
I
i /1-'09",,,/ .... .?__ ,
• J mes F. Matthe , Fire Marshal
1
D-5
1600 PARK PLACE
SEATTLE,WASHINGTON 98101
ti
COMMERCIAL REAL ESTATE SERVICES
March 11 , 1981
Mr. Delton Bonds
P.O. Box 66101
Seattle, WA 98166
Dear Del :
I am enclosing some brochures on projects in the southend area
showing the type of construction and business centers that have been
built to date. As to your request regarding the overall market in
the South King County area, perhaps the following information will be
of help to you in your analysis:
There are presently 32 million sq. ft . of industrial space in the
Renton—Tukwila—Kent area. Of this space, there is approximately
1 million sq. ft. vacant. This would represent a 3% vacancy factor
at the present time. The significant point is that there Has only
485,000 sq. ft. of new space built during 1980. As a result, this
one million sq. ft . of space, that is available today, represents
only five months inventory. Of course, as it is leased, the
available square footage becomes less and less.
Should you have any questions or need additional information, please
fee free to contact me.
Very truly yours,
COLDWELL BANKER
COMMERCIAL REAL ESTATE SERVICES
Milton A. Reimers
Senior Sales Consultant
MAR:jml
Enclosures
D-6
D-7
The
Transportation Engineering& Planning ConsultantsrI'AJJSI
March 20, 1981 gbrO\ip
Ms. Deborah Krouse
R.W. Thorpe and Associates -
815 Seattle Tower
3rd and University
Seattle, WA 98101
SUBJECT: BLACK RIVER OFFICE PARK
Dear Ms. Krouse:
Thank you for asking The TRANSPO Group to make a preliminary assessment
of the traffic conditions associated with the proposed Black River Office
Park. This letter presents an estimate of daily and evening peak hour
trip generation, a list of anticipated traffic problem areas, and a list
of reasonable mitigating measures.
Project Description
The basis of our analysis is the site plan and project description which
was provided by your office. From your letter, we understand this project ' --
will include about 35.58 acres of office development and about 12.09 acres
of warehousing. The warehousing is proposed to be served by rail . The ,
offices could be one or two stories, depending on the market for office
space at the time the buildings are being designed. The project is pro-
posed to be constructed in two phases. Access to Phase I will be provided
by a single road that connects to the proposed road system which serves
the Earlington Park Development. Phase 2, on the western portion of the
site, will connect with the Phase 1 road system and will build a secondary
access to Monster Road across the proposed P-1 channel .
Trip Generation
Trip generation estimates were made using a range of assumptions regarding
building design and function (e.g. , one-story or two-story office buildings;
office park or general office development, etc. ) . The Institute of Trans-
portation Engineers Trip Generation Manual , 1979, and Arizona DOT Trip
Generation Intensity Factors Manual , 1980, were the sources of trip genera-
tion rate information. Applying these trip generation rates, we found that
this development could generate between 9,070 and 34,030 vehicles per day
(vpd) . The evening peak hour for the warehousing generally is slightly
before the traditional 4:30 to 5:30 p.m. evening peak hour. During this
4:30 to 5:30 p.m. time period, the combination of office and warehouse
uses are expected to generate between 1,250 and 3,970 vehicles per hour
(vph) •
Twenty-three 148th Avenue Southeast •Bellevue,Washington 98007•(206)641-3881 :i-
D-8
•
Ms. Deborah Krouse
March 20, 1981
Page 2
Impacts
1 When these volumes are assigned to the road system, several dominant
patterns are forecasted to emerge. During Phase I development, all
traffic will flow through the Earlington Park development. This addi-
tional volume will add traffic and increase congestion at most of the
major intersections along Rainier Avenue and Grady Way. When the road
- 7 adjacent to the west side of Earlington Park is developed, a substan-
tial volume of traffic, especially truck traffic, will shift away from
Rainier Avenue to access I-405 at Interurban Boulevard via Grady Way.
Even following development of Phase 2 and the accompanying road con-
nection to Monster Road, congestion along Grady. Way, Rainier Avenue,
and their intersection with 7th Street, Powell Avenue, and Lind Avenue
will tend to discourage people from driving these routes and will result
in a shift of a noticeable portion of traffic onto Monster Road. While
much of the automobile traffic is expected to travel to and from the
north via Sunset Boulevard, there will be a substantial attraction to
and from the south to I-405 via Grady Way and Interurban Avenue.
In summary, congestion at intersections east and south of the site will
continue to increase. Because many of these intersections currently
operate at capacity and because relatively little can be done to increase
the capacity of these intersections and/or freeway, there will be several
impacts associated with this or any new development in Renton:
• People will seek alternative routes to avoid congestion.
• Capacity conditions at key locations will extend over longer
periods of time such that hour-long capacity conditions today
may extend for more than one hour in the future.
• Some people may shift their mode of travel to transit or may
choose to carpool , vanpool , or fleet ride to and from work.
It must be emphasized that these types of impacts will occur regardless of
the type, size or location of development or its road system.
In addition to the impacts at these intersections, there is likely to be
increased congestion and safety hazard potential on Monster Road which is
narrow and winding and which has been designed to serve moderate volumes
of passenger-sized vehicles. Because much of the traffic will travel north
on Monster Road, there will be increased congestion at its intersection
with Sunset Boulevard.
D-9
' I
Ms. Deborah Krouse
March 20, 1981
Page 3
Mitigating Measures
There is not a great deal that can be done to the traffic to mitigate
impacts through construction of new roads. One exception might be to
extend the road that is proposed to be built along the west edge of
Earlington Park. Such a road could be tied into a westerly access
from the Black River Office Park project and could serve to reduce
traffic volumes that flow through Earlington Park. Moreover, if built
properly, it could eventually serve as the first stage of the Longacres
Parkway. There will likely need to be some upgrading to Monster Road
to increase safety and build up the road to support heavy trucks.
This would likely include the rechannelization and possible signaliza-
tion of the Sunset Boulevard/Monster Road intersection.
There are, however, policies and programs that can be instituted to
mitigate the impacts associated with the additional traffic generated
by this project. These actions could include the following:
• Establish a new bus route or modify an existing bus route
to pass through the project.
• If bus service is modified to be convenient, provide bus
passes as a company or office park benefit.
• Office park management should advise tenants and their em-
ployees of the advantages of fleet ride, vanpool and carpool
programs through a package of information provided at initial
occupancy for each tenant and coordinated through the Seattle-
King County Commuter Pool agency. Office park management
should also schedule public information meetings for employers
and employees.
• As much as practical, office park management should encourage
employers to initiate a flextime work schedule so peak period
traffic can be distributed more evenly over the 3:30 to 5:30 p.m.
peak period, and thus have less impact on the already congested
road system.
As an inducement to achieve these objectives, the City might want to con- H
sider limiting the number of required parking spaces to less than is
currently prescribed by code to discourage the use of the single occupant
vehicle.
D-10
Ms. Deborah Krouse
March 20, 1981
Page 4
Summary
Like any new development, there will be additional traffic volumes
generated by this project -- between 9,070 and 34,030 vpd and between
1,250 and 3,970 vph during the evening peak hour. This additional
volume will add to the existing congestion at intersections along
major arterials. Minor improvements to street channelization and
intersection control will serve to mitigate these congestion and
safety impacts. Greater levels of mitigation can be achieved
through implementation of measures that encourage transit and high
occupancy vehicles.
We trust the City recognizes that traffic flow on the existing trans-
portation system cannot be measurably improved without major capital
improvements like widening I-405, or without significant shifts away
from the single occupant vehicle; and even these types of actions
will not improve or in most cases even maintain the quality of traffic
flow on a local level . In other words, any new development will have
some type of adverse traffic impact. The role of a traffic analysis
is to identify acceptable measures achievable within the context of
project objectives that will mitigate (to make less severe) and de-
sirably, but not necessarily, that will eliminate adverse impacts.
Then, it is the intent of SEPA to balance the benefits derived from
a project with the adverse impacts it generates.
I trust this summary addresses the primary issues that City of Renton
staff needs to understand the general level of impacts associated with
increased traffic volume generated by this project. If you have any
questions relative to the information presented in this report or if
you need more information, I invite you to call me.
Sincerely,
The TRANSPO Group, Inc.
David. D. Markley
Principal
DDM/l f