HomeMy WebLinkAboutD-401695GENERAL NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR BID
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
18144DET-IRR.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Interdisciplinary Design
SEATTLE
3131 Elliott Ave
Suite 400 WA 98121
(206) 286 1640 www.kpg.com
Tacoma
Wenatchee
Bellevue
STORMWATER GREEN CONNECTIONS PROJECT
NE 16TH ST - JEFFERSON AVE NE
7-17-2020ELIZ A B ETH GIBS
O
NNO. 538 EXP. 08 /1 6 /2 020STATE O F W ASHIN
GTONLAND
S
CAPE A R C H IT ECTIRRIGATION SCHEDULE
AUTOMATIC CONTROL VALVE TYPICAL SWING JOINT
CONTROL WIRE BUNDLE INSTALLATION
SOD
LG
CES
YS
KPG
95 96
JULY 2020
N/A
18144
95
IRRIGATION DETAILS
--------
CONDUIT RISER DETAIL
JARED MCDONALD,PE 11/16/2020
AS-BUILT1BSJM06/28/23AS-BUILT
D-401695