Loading...
HomeMy WebLinkAboutD-401626HMA TRANSITION RAMP DETAIL NE 16TH ST AND HARRINGTON AVE NE GRIND / OVERLAY SECTION CEMENT CONC. SIDEWALK REPLACEMENT DETAIL HANDRAIL DETAILHANDRAIL PLACEMENT DETAIL ROCK FACING, CUT SECTION NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR BID DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 18144RD-DET.dwg BID DOCUMENT Public Works Department CITY OF RENTON Interdisciplinary Design SEATTLE 3131 Elliott Ave Suite 400 WA 98121 (206) 286 1640 www.kpg.com Tacoma Wenatchee Bellevue REGIST ER E D NOTGNIHSAWFOETATS ERN EPRFO E NNALIO E S IGS 52116SAM O B D E DOU G LASSTORMWATER GREEN CONNECTIONS PROJECT NE 16TH ST - JEFFERSON AVE NE 7-17-2020-------- ROADWAY DETAILS 26 18144 N/A JULY 2020 9626 KPG DC SOD JF SOD JARED MCDONALD,PE 11/16/2020 AS-BUILT1BSJM06/28/23AS-BUILT D-401626