Loading...
HomeMy WebLinkAboutD-401703L A K E Y OU NG S W A Y S E LAKE Y O U N G S C T S E 8645500170 8645500180 8645500190 8645500200 8645500210 8645500220 8645500230 8645500240 8645500250 8645600040 8645600030 8645500130 8645500140 8645500150 8645500160 RIGHT OF WAY (TYPICAL) 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 4 5 4 4 4 44 4 4 4 4 2 4 4 4 4 4 6 6 4 4 6 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 9 9 99 9 8 8 8 3 3 2 1 2 8 5 5 3 2 2 10 4 5 11 12 4 14 13 4 2BID SETSWP - 27 - 4017LAKE YOUNGS CT SE STORM & WATER IMPROVEMENTS N Feet1:240 4020010 TESC & DEMOLTION LEGEND CLEARING LIMITS INLET SEDIMENT PROTECTION SAWCUT: APPROX. 2" TO 3" DEPTH REMOVE SIDEWALK/DRIVEWAY REMOVE ASPHALT REMOVE CURB AND GUTTER KEY NOTES PRESERVE AND PROTECT EXISTING ASPHALT. PROVIDE NEAT SAWCUT. PRESERVE AND PROTECT EXISTING SIDEWALK AND/OR DRIVEWAY. PRESERVE AND PROTECT EXISTING UTILITY. PLUG PIPE(S) PER 2018 WSDOT STANDARD SPEC 7-08.3(4) PRESERVE AND PROTECT EXISTING TREE. KEYNOTE NOT APPLIED PRESERVE AND PROTECT EXISTING CURB AND GUTTER. ABANDON IN PLACE EXISTING WATER MAIN AND EXISTING WATER LATERALS UPON TRANSFER OF DOMESTIC SERVICES. SAWCUT TO BE DONE AT EXISTING JOINT. EXISTING NEWSPAPER STAND SHALL BE PERMANENTLY RELOCATED ACROSS THE STREET. SEE SHEET C300 FOR MORE INFORMATION. EXISTING MAILBOX STAND SHALL BE TEMPORARILY RELOCATED ACROSS THE STREET DURING CONSTRUCTION AND THEN RETURNED ONCE THE PROPOSED SIDEWALKS HAVE BEEN CONSTRUCTED. SEE SHEET C300 FOR MORE INFORMATION. EXISTING 2" BLOW-OFF ASSEMBLY TO BE ABANDONED, LID AND TOP SECTION OF VALVE BOX TO BE REMOVED. ENCASE ASSEMBLY WITH CDF. EXISTING SECTION OF CONCRETE SIDEWALK TO BE REMOVED AND REPLACED. EXISTING 4" GATE VALVE ON STEEL WATER MAIN, TO BE ABANDONED, LID AND TOP SECTION OF VALVE BOX TO BE REMOVED, UPON COMPLETION OF NEW WATER MAIN; SEE SHEET C500. ENCASE GATE VALVE WITH CDF. EXISTING SECTION OF ROADWAY TO BE REMOVED AND REPLACED. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 TESC & DEMOLITION NOTES 1.ALL EXISTING IMPROVEMENTS WITHIN CLEARING LIMITS SHALL BE DEMOLISHED AND REMOVED FROM THE SITE UNLESS OTHERWISE IDENTIFIED. 2.THE WORK UNDER THE CONTRACT INCLUDES ALL CLEARING NECESSARY TO COMPLETE ALL WORK ASSOCIATED WITH THIS PROJECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FULLY REVIEW THE SITE CONDITIONS AND TO CORRELATE THESE OBSERVATIONS WITH THE PROJECT WORK AND INCLUDE ALL NECESSARY DEMOLITION, WHETHER SHOWN OR NOT, AND INCLUDE ALL SUCH COSTS IN THE SCOPE OF THE WORK. 3.CONTRACTOR SHALL LEGALLY DISPOSE OF ALL DEMOLISHED AND REMOVED MATERIALS FROM THE SITE UNLESS OTHERWISE NOTED. 4.ALL EXISTING WATER METER BOXES TO BE REMOVED UPON TRANSFER OF DOMESTIC SERVICES. 5.THE TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) PLAN OUTLINED HEREIN IS CONCEPTUAL. THE CONTRACTOR IS REQUIRED TO SUBMIT A FINAL TEMPORARY WATER POLLUTION AND EROSION CONTROL PLAN IN ACCORDANCE WITH SPECIAL PROVISIONS SECTION 1-07.15. 6.THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION , MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/ESC SUPERVISOR UNTIL ALL CONSTRUCTION IS APPROVED. 7.THE ESC FACILITIES SHOWN ON THESE PLANS ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND MODIFIED TO ACCOUNT FOR CHANGING SITE CONDITIONS (E.G., ADDITIONAL SUMP PUMPS, RELOCATION OF DITCHES AND SILT FENCES, ETC.). 8.THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE APPLICANT/ESC SUPERVISOR AND MAINTAINED TO ENSURE CONTINUED PROPER FUNCTIONING. WRITTEN RECORDS SHALL BE KEPT OF WEEKLY REVIEWS OF THE ESC FACILITIES DURING THE WET SEASON (OCT. 1 TO APRIL 30) AND OF MONTHLY REVIEWS DURING THE DRY SEASON (MAY 1 TO SEPT. 30). 9.PUBLIC STREETS SHALL BE CLEANED ONCE PER DAY OR AS DIRECTED BY THE CITY. FLUSHING OF STREETS WITH WATER WILL NOT BE ALLOWED. 10.IN ACCORDANCE WITH DEPARTMENT OF ECOLOGY REQUIREMENTS, WASTEWATER FROM CEMENT CONCRETE MASONRY, OR ASPHALT CONCRETE CUTTING, OR POURING OPERATIONS SHALL NOT BE DISCHARGED INTO STORM DRAINAGE SYSTEMS OR SURFACE WATERS. IMPERVIOUS SURFACES CONTAMINATED WITH SEDIMENT FROM GRIT AND CUTTING, PLANNING OR PULVERIZING OPERATIONS SHALL BE VACUUM-CLEANED TO PREVENT CONTAMINANTS FROM ENTERING THE STORM DRAINAGE SYSTEM OR SURFACE WATERS. 11. ALL DEWATERING WATER AND RUNOFF WITHIN CONSTRUCTION AREAS SHALL BE TREATED VIA SEDIMENTATION, FILTRATION THROUGH VEGETATION IN APPROVED AREAS, OR PORTABLE FILTRATION SYSTEMS (UTILIZING TANKS AND FILTERS), AS NEEED, PRIOR TO DISCHARGE TO DOWNSTREAM SYSTEM IN ORDER TO MEET ALL APPLICABLE LOCAL, STATE AND FEDERAL WATER QUALITY REGULATIONS. CONTRACTOR MAY ALSO DISCHARGE TO THE SANITARY SEWER SYSTEM AFTER OBTAINING APPLICABLE PERMITS AND MEETING PRETREATMENT REQUIREMENTS. 1 C201 TESC & DEMO PLAN GENERAL NOTES 1.SEE DRAWING C300 FOR PAVING AND RESTORATION IMPROVEMENTS. SEE DRAWING C400 FOR STORM IMPROVEMENTS. SEE DRAWING C500 FOR WATER IMPROVEMENTS. 2.SEE DRAWING C101 FOR ADDITIONAL TESC NOTES 1 C101 JARE D MCDON A LDPROF ESSIONAL ENG I N E ERREGISTER EDSTATE OF WASHIN G TON05/09/19AS-BUILTAS-BUILT1 BS 06/28 JM D-401703