HomeMy WebLinkAboutD-403001COVER SHEET
Sheet Index
Sheet Number Sheet Number Sheet Title
1 C100 COVER SHEET
2 C200 SITE PREP PLAN
3 C300 STORM DRAINAGE PLAN
GENERAL NOTES
HORIZONTAL DATUM
VERTICAL DATUM
1.ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE LOCAL,
STATE AND FEDERAL LAWS. SEE THE "STANDARD DETAILS" SECTION OF THE
PROJECT SPECIFICATIONS FOR REFERENCED CITY OF RENTON (COR)
STANDARD DETAILS AND ANY REFERENCED WASHINGTON STATE DEPARTMENT
OF TRANSPORTATION (WSDOT) STANDARD DETAILS. ALL WORK AND MATERIALS
SHALL BE IN ACCORDANCE WITH THE CITY OF RENTON STANDARDS AND THE
CONTRACT SPECIAL PROVISIONS
2.ALL WORK SHALL BE SUBJECT TO INSPECTION BY THE CITY ENGINEER OR
DESIGNATED REPRESENTATIVE.
3.PRIOR TO BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL MEET WITH
THE CITY ENGINEER FOR A PRECONSTRUCTION CONFERENCE.
4.A COPY OF THESE APPROVED PLANS AND PROJECT SPECIFICATIONS MUST BE
ON THE SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
5.LOCATIONS OF EXISTING UTILITIES ARE APPROXIMATE. LOCATIONS ARE BASED
ON A COMBINATION OF ONE OR MORE OF THE FOLLOWING: OBSERVATION OF
SURFACE FEATURES, GEOGRAPHIC INFORMATION SYSTEM DATA, PAINT MARKS
APPLIED BY AN UNDERGROUND UTILITY LOCATING SERVICE, CCTV, AND
RECORD SCHEMATIC DRAWINGS. UTILITIES SHOWN IN THESE DRAWINGS ARE
FOR THE PURPOSES OF ASSISTING THE CONTRACTOR WITH LOCATING
UTILITIES. THE CITY OF RENTON ASSUMES NO LIABILITY FOR THE ACCURACY OF
THE RECORD INFORMATION. CONTRACTOR SHALL FIELD LOCATE ALL UTILITIES
WITHIN PROPOSED EXCAVATION LIMITS. CONTACT UNDERGROUND UTILITY
LOCATE SERVICE (1-800-454-5555) A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION TO OBTAIN ON-SITE UTILITY LOCATIONS. CONTRACTOR SHALL
POTHOLE ALL UNDERGROUND GAS, WATER, SERVICE CONNECTIONS, AND ALL
OTHER UNDERGROUND UTILITIES PRIOR TO THE START OF CONSTRUCTION AND
NOTIFY THE ENGINEER OF ANY CONFLICTS. PRECAUTIONS AND REMEDIAL
MEASURES SHALL BE TAKEN AS REQUIRED TO PROTECT PERSONS AND
PROPERTY AND TO AVOID DISRUPTION OF SERVICE. UNLESS OTHERWISE
NOTED, PROJECT ALL UTILITIES FROM DAMAGE WHICH SHALL INCLUDE
PROVIDING TEMPORARY SUPPORT SYSTEMS AND SHORING AROUND UTILITIES
DURING EXCAVATION, IF AN EXISTING PRIVATE UTILITY CONFLICTS WITH
PROPOSED IMPROVEMENTS, COORDINATE THE RELOCATION OF THE PRIVATE
UTILITY WITH THE UTILITY OWNER UNLESS NOTED OTHERWISE OR DIRECTED BY
THE ENGINEER.
6.EXISTING WATER LINE BEND AND BLOCKING ARE NOT SHOWN.
7.STORM SEWER LENGTHS ARE MEASURED BETWEEN CENTERS OF MANHOLES
AND CATCH BASINS UNLESS OTHERWISE NOTED.
8.EXCEPT AS OTHERWISE NOTED, CATCH BASIN AND MANHOLE RIM ELEVATIONS
GIVEN ARE APPROXIMATE. FINAL ELEVATIONS SHALL MATCH FINAL GRADE.
9.USE CDF FOR BEDDING AND BACKFILLING AROUND EXISTING OR NEW UTILITIES
WHERE STANDARD METHODS DO NOT PERMIT COMPACTION REQUIREMENTS TO
BE MET, AS SHOW ON THE DRAWINGS, OR AS DIRECTED BY THE ENGINEER.
10.SITE CONSTRUCTION LIMITS (PRESERVATION LINES) COINCIDE WITH CITY
RIGHT-OF-WAY UNLESS SHOWN OTHERWISE.
11.FOR CLARITY OF DRAWINGS, OVERHEAD POWER AND TELECOM ARE NOT
SHOWN ON THE DRAWINGS. CONTRACTOR IS ADVISED THAT THERE ARE
OVERHEAD POWER AND TELECOM THROUGHOUT PROJECT AREA, INCLUDING
DIRECTLY OVER PROPOSED PIPE IMPROVEMENTS. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO PERFORM THE WORK IN A SAFE MANNER AND IN
ACCORDANCE WITH ANY REQUIREMENTS SET FORTH BY THE UTILITY OWNER
AND APPLICABLE LAWS AND REGULATIONS.
12.NO STAGING AREA IS PROVIDED TO THE CONTRACTOR. ALL STAGING AREAS
SHALL BE ON A CONTRACTOR SECURED AREA. ALL TESC REQUIREMENTS APPLY
TO THE CONTRACTOR'S OBTAINED STAGING AREA.
13.CONTRACTOR SHALL COORDINATE WITH CITY OF RENTON WATER UTILITY
ABOUT ANY RELOCATION OR MODIFICATION TO SERVICE LINES. TEMPORARY
WATER SERVICE RELOCATION INCLUDES SERVICE LINE AND CONNECTION
FITTINGS AND SHALL BE INCIDENTAL TO OTHER PAYMENT ITEMS.
14.THE NEW STORM CROSSES EXISTING UNDERGROUND GAS MAINS AND GAS
SERVICES IN MULTIPLE LOCATIONS. IF NOT PREVIOUSLY POTHOLED BY PSE,
CONTRACTOR SHALL POTHOLE GAS A MINIMUM OF 10 DAYS IN ADVANCE OF
PERFORMING WORK IN THE AREA AND PROVIDE RESULTS TO ENGINEER. IF
EXISTING GAS MAIN IS IN CONFLICT WITH NEW STORM, CITY WILL PROVIDE NEW
PROFILE GRADES FOR THE STORM PIPING. ADJUSTMENT OF THE STORM
ALIGNMENT SHALL BE AT NO ADDITIONAL COST TO THE CITY. IF EXISTING GAS
MAIN (OR SERVICE) IS IN CONFLICT WITH NEW STORM AND STORM PROFILE
CANNOT BE ADJUSTED, CONTRACTOR SHALL COORDINATE WITH PSE FOR GAS
RELOCATION (CONTACT PSE GAS REPRESENTATIVE CHANG PAK AT
253-395-6988). ALL COST FOR COORDINATION WITH PSE FOR GAS SERVICE
RELOCATION SHALL BE PAID FOR BY FORCE ACCOUNT.
15.CONTRACTOR SHALL NOT ORDER PRECAST MANHOLES/CATCH BASINS UNTIL
ALL POTENTIAL CONFLICTS THAT COULD AFFECT THE MANHOLES/CATCH
BASINS HAVE BEEN POTHOLED TO CHECK FOR CONFLICT, AND THOSE
CONFLICTS HAVE BEEN RESOLVED.
16.ALL STORM DRAINAGE PIPES SHALL HAVE WATERTIGHT JOINTS PER
MANUFACTURER RECOMMENDATION.
17.EXISTING STORM DRAINAGE PIPES SHALL BE ABANDONED AND FILLED WHERE
INDICATED ON THE PLANS IN ACCORDANCE WITH SECTION 2-02.3(4) OF THE
SPECIAL PROVISIONS FOR PIPES AND SECTION 7-05.3(2) OF THE STANDARD
SPECIFICATIONS AND SPECIAL PROVISIONS FOR STRUCTURES.
18.CONTRACTOR SHALL REPLACE ANY SURVEY MONUMENTS DISTURBED IN
ACCORDANCE WITH SECTION 1-05.4 OF THE SPECIAL PROVISIONS AND CITY OF
RENTON SURVEY STANDARDS AT NO ADDITIONAL COST TO THE CITY OF
RENTON.
19.FOR PAVEMENT RESTORATION, CONTRACTOR IS REQUIRED TO PROVIDE A HOT
MIX ASPHALT TRENCH PATCH IN ACCORDANCE WITH COR STANDARD PLAN
220.20.
20.WHERE TYPE 2 CATCH BASINS ARE INSTALLED IN ROADWAY GUTTER SECTION
THEY SHALL BE PLACED IN ACCORDANCE WITH COR STANDARD PLAN 101.1.
WASHINGTON STATE PLANE COORDINATE SYSTEM, NORTH ZONE, NAD 83/91
NAVD 88
TAYLOR AVE NW
STORM IMPROVEMENTS
VICINITY MAP N
PROJECT
LOCATIONSWP - 27 - 4030TAYLOR AVE NW
STORM IMPROVEMENTS
H:\CAD\_PROJECTS\SWP\27-4030_TAYLOR\DWGTAYLOR AVE NWRAINIER AVE NRENT
O
N
AV
E
E
XT
NW 2ND PL
GENERAL ESC NOTES
1.THE TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) PLAN OUTLINED
HEREIN IS CONCEPTUAL. THE CONTRACTOR IS REQUIRED TO SUBMIT A FINAL
TEMPORARY WATER POLLUTION AND EROSION CONTROL PLAN IN ACCORDANCE
WITH SPECIAL PROVISIONS SECTION 1-07.15.
2.THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION,
MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS
THE RESPONSIBILITY OF THE APPLICANT/ESC SUPERVISOR UNTIL ALL
CONSTRUCTION IS APPROVED.
3.THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED PRIOR TO
OR IN CONJUNCTION WITH ALL CLEARING AND GRADING SO AS TO ENSURE
THAT THE TRANSPORT OF SEDIMENT TO SURFACE WATERS, DRAINAGE
SYSTEMS, AND ADJACENT PROPERTIES IS MINIMIZED.
4.THE ESC FACILITIES SHOWN ON THESE PLANS OR SPECIFIED HEREIN ARE THE
MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE
CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS
NEEDED FOR UNEXPECTED STORM EVENTS AND MODIFIED TO ACCOUNT FOR
CHANGING SITE CONDITIONS (E.G., ADDITIONAL SUMP PUMPS, RELOCATION OF
DITCHES AND SILT FENCES, ETC.).
5.THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE APPLICANT/ESC
SUPERVISOR AND MAINTAINED TO ENSURE CONTINUED PROPER FUNCTIONING.
WRITTEN RECORDS SHALL BE KEPT OF WEEKLY REVIEWS OF THE ESC
FACILITIES DURING THE WET SEASON (OCT. 1 TO APRIL 30) AND OF MONTHLY
REVIEWS DURING THE DRY SEASON (MAY 1 TO SEPT. 30).
6.ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT
WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON OR SEVEN
DAYS DURING THE DRY SEASON SHALL BE IMMEDIATELY STABILIZED WITH THE
APPROVED ESC METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING,
ETC.).
7.ANY AREA NEEDING ESC MEASURES NOT REQUIRING IMMEDIATE ATTENTION
SHALL BE ADDRESSED WITHIN FIFTEEN (15) DAYS.
8.THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED
A MINIMUM OF ONCE A MONTH OR WITHIN FORTY-EIGHT (48) HOURS FOLLOWING
A STORM EVENT.
9.AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO
ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE
LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL
NOT FLUSH SEDIMENT-LADEN WATER INTO THE DOWNSTREAM SYSTEM.
10.WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT
SHALL BE APPLIED AT A MINIMUM THICKNESS OF 2 TO 3 INCHES.
11.NO STOCKPILING/STAGING WILL BE CONDUCTED WITHIN THE RIGHT OF WAY OR
CITY OWNED SITE. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ITS OWN
STOCKPILE/STAGING AREAS.
12.PUBLIC STREETS SHALL BE CLEANED ONCE PER DAY OR AS DIRECTED BY THE
CITY. FLUSHING OF STREETS WITH WATER WILL NOT BE ALLOWED.
13.IN ACCORDANCE WITH THE DEPARTMENT OF ECOLOGY REQUIREMENTS,
WASTEWATER FROM CEMENT CONCRETE MASONRY, OR ASPHALT CONCRETE
CUTTING, OR POURING OPERATIONS SHALL NOT BE DISCHARGED INTO STORM
DRAINAGE SYSTEMS OR SURFACE WATERS. IMPERVIOUS SURFACES
CONTAMINATED WITH SEDIMENT FROM GRIT AND CUTTING, PLANING OR
PULVERIZING OPERATIONS SHALL BE VACUUM-CLEANED TO PREVENT
CONTAMINANTS FROM ENTERING THE STORM DRAINAGE SYSTEM OR SURFACE
WATERS.
14.CATCH BASIN INSERTS SHALL BE PLACED AT ALL CATCH BASINS ALONG PIPE
ALIGNMENT. SEE CITY OF RENTON STANDARD PLAN 216.30.
15.INSTALL SILT FENCING AROUND ENTIRE STAGING/STOCKPILE AREAS PER COR
STANDARD PLAN 214.
16.TEMPORARY SEDIMENTATION TANK MAY BE REQUIRED IN CONTRACTOR
STAGING AREA IF THE SILT FENCING IS NOT ADEQUATE.
17.KEEP PUBLIC AND PRIVATE ROADWAYS/PARKING LOTS, SIDEWALKS, AND TRAILS
FREE OF DEBRIS AND SEDIMENT.
18.CONSTRUCT TEMPORARY STORMWATER BYPASSES AS NEEDED DURING
CONSTRUCTION TO DIVERT STORMWATER AROUND TRENCHING AND PIPE
INSTALLATION ACTIVITIES AND MAINTAIN DRAINAGE OF UPSTREAM
STORMWATER. CONTRACTOR IS RESPONSIBLE FOR DESIGN OF STORM DRAIN
BYPASS PLAN. UNLESS OTHERWISE NOTED, BYPASSES ARE TO BE DESIGNED TO
HANDLE THE VOLUME AND PEAK FLOWS OF THE 2-YEAR STORM EVENT AT A
MINIMUM. SUBMIT AS PART OF WATER CONTROL PLAN. STORM DRAIN BYPASS
PLAN SHALL ALSO ADDRESS THE DOWNSTREAM SYSTEM AND PREVENTION OF
STORMWATER ENTERING THE WORK AREA BY BACKING UP FROM
DOWNSTREAM.
19.ALL DEWATERING WATER AND RUNOFF WITHIN CONSTRUCTION AREAS SHALL
BE TREATED VIA SEDIMENTATION, FILTRATION THROUGH VEGETATION IN
APPROVED AREAS, OR PORTABLE FILTRATION SYSTEMS (UTILIZING TANKS AND
FILTERS), AS NEEDED, PRIOR TO DISCHARGE TO DOWNSTREAM SYSTEM IN
ORDER TO MEET ALL APPLICABLE LOCAL, STATE AND FEDERAL WATER QUALITY
REGULATIONS. CONTRACTOR MAY ALSO DISCHARGE TO THE SANITARY SEWER
SYSTEM AFTER OBTAINING APPLICABLE PERMITS AND MEETING PRETREATMENT
REQUIREMENTS.AS-BUILTAS-BUILT1 BS 07/12 JM