Loading...
HomeMy WebLinkAboutCM_Construction Narrative_PACCAR_230623_v1.pdf DLR Group inc. a Washington corporation 51 University Street, Suite 600 Seattle, WA 98101 April 27, 2023 City of Renton Planning Division 1055 South Grady Way, 6th Floor Renton, WA 98057 Re: PACCAR Kenworth R&D Center Construction Mitigation Narrative Dear Planning Division, No site disruption will be taking place as part of this project so storm water and erosion control will not be applicable. Site laydown space and storage during construction will be secured on site in existing parking lot / storage areas. Waste will be collected, sorted, and hauled on site as well by the General Contractor. Sincerely, DLR Group Mike Vander Ploeg Workplace Sector Leader NW Principal