HomeMy WebLinkAboutCM_Construction Narrative_PACCAR_230623_v1.pdf
DLR Group inc.
a Washington corporation
51 University Street, Suite 600
Seattle, WA 98101
April 27, 2023
City of Renton Planning Division
1055 South Grady Way, 6th Floor
Renton, WA 98057
Re: PACCAR Kenworth R&D Center Construction Mitigation Narrative
Dear Planning Division,
No site disruption will be taking place as part of this project so storm water and erosion control will not be
applicable. Site laydown space and storage during construction will be secured on site in existing parking lot /
storage areas. Waste will be collected, sorted, and hauled on site as well by the General Contractor.
Sincerely,
DLR Group
Mike Vander Ploeg
Workplace Sector Leader NW
Principal