Loading...
HomeMy WebLinkAboutRS_Traffic Memo_PACCAR_230623_v1.pdf DLR Group inc. a Washington corporation 51 University Street, Suite 600 Seattle, WA 98101 April 27, 2023 City of Renton Planning Division 1055 South Grady Way, 6th Floor Renton, WA 98057 Re: PACCAR Kenworth R&D Center Project Narrative Dear Planning Division, The proposed project is an adding 6,000 sf of new office space; however, we are only moving desks from existing shop space into new dedicated office space. The total number of desks / occupant load is only increasing by +10 resulting in peak load traffic impact being <25 tips. No change to existing parking and the current parking is larger than the needed capacity on the site / building. Existing parking count: 195 (shared with other site buildings) Proposed parking count: 195 (shared with other site buildings) No impact to existing infrastructure on site. Sincerely, DLR Group Mike Vander Ploeg Workplace Sector Leader NW Principal