No preview available
HomeMy WebLinkAboutRES 4501CITY OF RENTON, WASHINGTON RESOLUTION NO. 4501 A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, AMENDING THE 2023/2024 CITY OF RENTON FEE SCHEDULE. WHEREAS, on November 23, 2009, the Council adopted Ordinance No. 5509, which removed many fees from the Renton Municipal Code and consolidated them into the 2010 City of Renton Fee Schedule brochure, which has been subsequently amended; and WHEREAS, on November 14, 2022, the City Council passed Resolution No. 4484, adopting an amended fee schedule for 2023 and 2024; and WHEREAS, the fee schedule for 2023 and 2024 was subsequently amended by Resolution No. 4492; and WHEREAS, it is necessary to approve an amended fee schedule to make periodic updates as part of the City's 2nd Quarter Budget amendment; and WHEREAS, several Aquatic Fees and Parks and Facilities Use and Rental Fees in the November 14, 2022 amended fee schedule were inadvertently not updated as intended; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO RESOLVE AS FOLLOWS: SECTION I. The fee schedule is amended and replaced with the 2023-2024 City of Renton Fee Schedule brochure, which is attached hereto and adopted by this reference ("Fee Schedule"). An updated copy of the Fee Schedule shall at all times be filed with the City Clerk as required by Ordinance No. 5509. 1 RESOLUTION NO. 4501 SECTION II. The fees set forth in Section IV. Aquatic Fees and Section VI. Parks and Facilities Use and Rental of the Fee Schedule are effective as of January 1, 2023, and fees charged prior to the date of this Resolution are hereby approved and ratified. SECTION III. Except as provided separately herein, or within the Fee Schedule, the amended Fee Schedule adopted by Section I of this resolution shall be effective on July 24, 2023 and thereafter act as the City of Renton's Fee Schedule for all fees or changes referenced therein. The Fee Schedule shall remain in effect until amended or otherwise replaced by the City Council. In the event the Fee Schedule is not amended prior to the year 2025, the fees specified for the year 2024 shall continue to apply into and beyond 2025 until amended by the City Council. PASSED BY THE CITY COUNCIL this 17th day of July, 2023. APPROVED BY THE MAYOR this 17th day of Jam, 2023. Approved as to form: "//Z� -�Z� Shane Moloney, City Attorney RES-FIN:1945:6/23/23 2 City of Renton Fee Schedule 2023-2024 City of Renton 2023-2024 Rev. May 2023 City of Renton Fee Schedule 2023-2024 Table of Contents Page SECTION I. MISCELLANEOUS FEES 1 SECTION II. MAPLEWOOD GOLF COURSE 2 SECTION III. CITY CENTER PARKING FEES 2 SECTION IV. AQUATIC FEES 3 SECTION V. CARCO THEATER (REPEALED) 3 SECTION VI. PARKS AND FACILITIES USE AND RENTAL 3 SECTION VII. COMMUNITY CENTER PASS CARD & FEES 4 SECTION VIII. AIRPORT CHARGES 4 SECTION IX. ANIMAL LICENSES FEES* - RMC 5-4-2 4 SECTION X. BUSINESS LICENSES 5 SECTION XI. ADULT ENTERTAINMENT LICENSES 5 SECTION XII. DEVELOPMENT FEES 6 Building Fees: 6 Land Use Review Fees: 8 Site Work, Utilities, and Right of Way Fees: 10 Technology Surcharge Fee 14 Impact Fees: 14 Miscellaneous Fees: 15 SECTION XIII. FIRE DEPARMENT FIRE MARSHAL FEES (RFA) 15 SECTION XIV. MONETARY PENALTY SCHEDULE FOR INFRACTIONS ISSUED UNDER 16 THE AUTHORITY OF CHAPTER 7.80 RCW City of Renton Fee Schedule 2023-2024 SECTION 1. MISCELLANEOUS FEES' 2023 2024 Zoning maps - standard 11 x 17 b. Zoning maps - large 24 x 36 $12 $12 C. Comprehensive Plan map - standard 11 x 17 $4 $4 d. Comprehensive Plan map - large 24 x 36 $12 $12 e. Precinct maps $5 $5 2. Plat: a. First page $2 $2 b. Each additional page $1 $1 3. Photocopies: a. Each 8.5" x 11" or 8.5" x 14" $0.15 $0.15 b. Each 11" x 17" $0.20 $0.20 C. Each 8.5" x 11" or 8.5" x 14" color $0.25 $0.25 4. Budget: a. City's Budget $10 $10 b. City's Budget to other municipality or quasi -municipal corporation or other nonprofit charitable or education organizatior N/C N/C S. Audio or Video Recording Copies: a. Audio recording, each copy $2 $2 b. Video recording, each copy $2 $2 6. Regulations and Plans: a. Comprehensive Plan and Map $30 $30 b. Title IV, Development Regulations: (i) Text and Zoning Map $110 $110 III) Text only $100 $100 C. Individual Chapters of Development Regulations $10 $10 d. Renton Municipal Code (two volumes) $400 $400 e. Code Supplements, per year: (i) Titles I - III and VI - X $70 $70 (ii) Title IV $70 $70 7. Miscellaneous Services: a. Certification and Notary Fees -Clerk's Certification $10 $10 b. Notary Public Attestation or Acknowledgement or as $10 $10 otherwise provided for in RCW 42.28.090, per signature Hold Harmless Agreements and other similar documents not otherwise provided for d. Lamination of licenses, pictures e. Community Development Block Grants (CDBG) Loan Program: (i) Application Fee (ii) Loan Origination Fee $20 $20 $200 $200 $150 or 0.25%of loan amount, $150 or 0.25%of loan amount, whichever is greater whichever is greater (iii) Closing Costs (including any legal fees) 50%of total actual costs 50% of total actual costs S. Miscellaneous Charges for Police Services: a. Police Reports per page $0.15 $0.15 b. Record Checks (Written Response) $5 $5 C. Photographs -Digital on CD $2 $2 d. Photographs - black & white or color -Cost of developing film Cost Cost e. Fingerprint Cards $5 $5 (i) Each additional card $1 $1 9. Charges for Fire Documents: a. Fire reports per page $0.15 $0.15 b. Fire investigative report on CD $2 $2 C. First copy - black & white or color - Cost of developing film Cost Cost d. Additional copy - black&white or color- Cost of developing film Cost Cost 10. Computer Listings: a. City of Renton new business list $10 $10 b. List of all business licenses $20 $20 C. Copies requested to be faxed, local number $3 $3 d. Copies requested to be faxed, long distance number (i) Multi -family: 2 units, Duplexes, & Accessory Dwelling Unit (ADU)' $30 $10 (n) Six (6) or more pages (ten (10) page limit) $20 $20 11. Utility Fee: a. Special Request Water Meter Reading $30 $30 b. Utility New Account Setup $25 $25 C. Utility Billing Account Transfer (tenant billing form) $5 $5 d. Water utility outstanding balance search requested by $25 $25 fax, messenger, or letter e Water turn off and turn on fee $60 $60 f Water utility shutoff list processing fee $60 $60 g Water delinquent late fee of 1D% of past due charges but not less than fifty cents 10% 10% h Water after hours service charge to turn on water after 3 p.m. (additional fee) $90 $90 1 Tenant notification fee for impending shutoff of water per tenant $5 $5 j Petition filing fee for stormwater appeal from category determination and assessment $75 $75 k Meter Accuracy Reading - For testing 3/4"through 2" meter $40 $40 1 Meter Accuracy Reading - For testing meters larger than 2" Time & Materials, requires Time & Materials, requires a $60 refundable deposit a $60 refundable deposit prior to test prior to test 12. Schedule of Fines for False Alarms - Security/Burglar: (effective February 1, 2019) a. One-time Registration Fee $25 $25 b. Annual Registration Renewal N/C N/C C. First False Alarm in a registration year' N/C N/C d. Second False Alarm in a registration year' $100 $100 e. Third or more False Alarm in a registration year' $250 $250 f. Late Payment Fee $25 $25 g. Unregistered Alarm System Fee $50 $50 City of Renton Fee Schedule 2023-2024 ' A registration year shall mean January 1 thru December 31 each year. ,SECTION• • s) 2023 2024 13. NSF Check Fees $25 $25 14. Veteran Park Tile: Three lines $75 $75 15. Electronic Records''z'': a. Photocopies or printed copies of electronic records, per page $0.15 $0.15 b. Scanning paper records, per page $0.10 $0.10 C. Electronic files or attachments uploaded for electronic delivery (email, cloud -based data storage service, or other means of $0.05 $0.05 electronic delivery), for each four (4) files d. Transmission of records in an electronic format or for the use of agency equipment to send the records electronically, per $0.10 $0.10 gigabyte (GB) e. Body worn camera footage redaction, per minute of documented staff time, plus other documented costs of redactior $0.64 $0.64 ' The charges identified in RCW 42.56.120(3)(b) (and referenced above) may be combined to the extent that more than one type of charge applies to copies produced in response to a particular request. The actual cost of any digital storage media or device provided by the agency. Alternatively, the City may charge a flat fee of up to $2 for the entire request as long as the cost of uploading and transmitting the electronic records is reasonably estimated to equal or exceed that amount. Only one $2 flat fee per request is authorized for electronic records produced in installments. When records are provided electronically on a CO, OVD, thumb drive, flash drive, or other electronic device, the requestor will be charged for the cost of the electronic storage device. The City may charge an actual -cost service charge for requests that require use of IT expertise to prepare data compilations or provide customized electronic access services when not used by the City for other nurnoses. A cost estimate and exolanatinn will be provided to the renuestor hefom incurring the costs- 2 Option to waive charges. The City may waive charges associated with fulfilling a request. The decision will be based on various factors, including the volume and format of the responsive documents. The decision to assess fees for fulfilling a public records request shall be made on a consistent and equitable basis, dependent primarily upon the amount of staff time required for copying, scanning. shipping. uploading. and/or transmitting the records associated with fulfilling a reauest. ' Certified copies. If the requestor is seeking a certified copy of a City record, an additional charge of $1.00 per each complete document may be applied to cover the additional expense and time required for certification. 26. Document Recording Fees: a. The applicant shall pay all document recording fees charged by King county and all administrative fees charged by the title Actual Costs Actual Costs company for processing. Payment in full shall by submitted to the City before documents are sent for recording. b. Miscellaneous charges associated with document recording, such as courier fees Actual Costs Actual Costs 17. Publication Fees: The applicant shall pay all Publication fees charged by publication outlet used by the City (The Seattle Times or equivalent). Actual Costs Actual Costs Payment in full shall be made to the City Driorto public hearing. permit aooroval or issuance. whichever comes first. ' Should Section I fees due total less than $4.00 and no other fee is due to the City at the same time, the department administrator may authorize to waive the entire amount due at their discretion SECTION••• GOLF COURSEt2024 1. Green Fees a. Weekday: (i) 18 Hole $43 $43 (ii) 9 Hole $32 $32 (iii) 18 Hole, Senior $34 $34 (iv) 9 Hole, Senior $26 $26 (v) 18 Hole, Junior $25 $26 (vi) 9Hole, Junior $19 $20 b. Weekend: (i) 18 Hole $50 $50 (ii) 9 Hole $32 $35 For purposes of this section, "weekend" shall mean Friday, Saturday, and Sunday. "Weekday" shall mean the remaining four days of the week. "Junior" shall mean ages 17 and under, "Senior' shall mean ages 62 and over. Off-season and promotional rates determined by management; posted on website. 2. Club Rental': a. Regular $30 $35 b. Premium $60 $65 3. Golf Cart Fees': a. 18 Hole $36 $38 b. 18 Hole Single Rider $28 $28 C. 9 Hole $24 $26 d. 9 Hole Single Rider $18 $18 e. Trail Fee $15 $15 f. Half Cart, 18 Hole $18 $19 g. Half Cart, 9 Hole $12 $13 4. Driving Range Fees': a. Large Bucket $13 $14 b. Small Bucket $10 $11 S. Lesson Fees: a. 1 2 Hour Private $55 $60 b. 1 Hour Private $80 $90 C. 1/2 Hour Series Private $200 $220 d. 1 Hour Series Private $300 $330 e. Group Series $140 $160 f. 1/2 Hour Private, Junior $35 $40 g. Playing Lesson(3-hole minimum/9-hale maximum) per hole $25 $30 ' Rates include Washington State Sales Tax (WSST) SECTIONt2024 1. City Center Parking Garage Fees: Parking rates for retail parking will be as follows: a. Zero (0) -two (2) hours N/C N/C b. Two (2) -four (4) hours $2 $2 C. Four (4) - six (6) hours $4 $4 d. Six (6) - (10) hours $6 $6 e. 10 hours or more $10 $10 f. Monthly pass -holders, tax included $35 $35 City of Renton Fee Schedule 2023-2024 SECTION IV. AQUATIC FEES 2023 2024 1. Admission for the Aquatic Center shall be as follows: a. Regular Session: (i) Infants - under 1 year N/C N/C (ii) Youth - 1 to 4 years $8 $8 (iii) Ages 5 and up $16 $16 (iv) Lap swim- water walking only $5 $7 (v) Locker Rental $0.25 $0.25 b. Canopy Rental Fees': (includes canopy and admission for one leisure swim session): (i) Henry Moses Party Tent #1 (10' x 20' for up to twenty-five (25) guests on wave pool): (1) Resident Rate, per session $600 $600 (2) Non-resident Rate, per session $700 $700 (ii) Henry Moses Party Tent #2 (10' x 20' for up to twenty-five (25) guests): (1) Resident Rate $500 $500 (2) Non -Resident Rate $600 $600 (iii) Henry Moses Parry Tent#3 (10' x 10'for up to ten (10) guests): (1) Resident Rate, per session 200$250 $250 (2) Non-resident Rate, per session 240$300 $300 C. Resident Rate all inclusive' $1,900$3,800 $3,800 d. Non-resident Rate all inclusive' $3,390 $4,800 $4,800 e. Swim Lesson Program: Fees and associated descriptions are published in the "Let's Go Renton" Renton Activities Guide f. End -of -year School Party Rentals: (i) Renton School District (1) 001-299students $1,900 $1,900 (2) 300-399students $2,250 $2,250 (3) 400-499students $2,400 $2,400 (4) 500 -599 students $2,550 $2,550 (ii) Other Schools and Districts (1) 001-299students $2,450 $2,450 (2) 300 -399 students $2,850 $2,850 (3) 400-499students $3,150 $3,150 (4) 500-599students $3,360 $3,360 ' Sales tax not included in the rental fee 2. Boat Launch Rates: a. Daily resident - 7 days a week 10 $20 15 $20 b. Daily Non-resident -7 days a week 20 $25 $25 C. Overnight resident - 7 days a week 20 $25 $25 d. Overnight Nan -resident - 7 days a week 40 $45 $45 e. Annual parking boat launch permit - resident $60 $70 $70 f. Annual parking boat launch permit - non-resident "$130 $130 g. Fishing Tournaments at Coulon Beach (additional rental fee if using the Pavilion area for weigh in and or electricity at the current rental rate) per event (1) Resident rate 60$110 35$110 b. Non-resident 2. Gene Coulon Beach Park Shelters (South #1, South #2 and Creekside) Maximum of 75 people: a. Resident 10am-7pm $150 $150 b. Non-resident 10am-7pm $290 $290 e. South Shelters 1 & 2 Resident rate $310 $310 f. South Shelters 1 & 2 Non-resident rate $610 $610 3. Gene Coulon Beach Park Shelters (North Shelter): a. Resident 10am-7pm $200 $200 b. Non-resident 10am-7pm $360 $360 4. TannicrBasketbalW�ii 6 court rate per hour (Tournament Play Only): w Tenn is - saw cF $10 $30 a �4eeurt a. (i� AesidenE-rate sr10$25 $25 b. {ii) Non- Nen-residen4sate $ 0 $30 $30 c, sand ve11eyball ceurf S. Open Space Area in the Parks (Cascade, Teasclale, Phillip Arnold, Cedar River, Earlington, Gene Coulon, Glencoe, Kennydale Lions, Sunset, and Riverview Parks): a. Resident rate per hour $d0 $25 $25 b. Non-resident rate per hour $24 $30 $30 C. Spe"Temporary Event Permit Fee $85 $85 6. Piazza Park Open Space Event Rental a. Full day rental loam -7pm $500 $500 7. Photo Shoots per hour: a. Commercial Film and Photo Shoots per hour $300 $300 S. Electrical Spider Box rental: a. Electrical spider box rental per box, per event, with special event approval 200 200 City of Renton Fee Schedule 2023-2024 SECTION (CONTINUED) r2024 9. Athletic Field Rental, Lights and Prep Fees: a. Sports field rental per hour - resident 25$30 $30 b. Sports field rental per hour - non-resident a0$36 $36 C. Renton Area youth Sports Agencies, per hour 6 $8 $8 d. Field prep for softbal l/baseball- resident per occurrence aO$35 $35 e. Field prep for soccer - resident per occurrence 4& $50 $50 f. Custom Field prep- resident per occurrence $100 $100 g. Field prep for softball/baseball - non-resident per occurrence $35 $40 h. Field prep for soccer - non-resident per occurrence $50 $55 I. Custom Field prep - non-resident per occurrence $100 $100 j. Field lights all sports - resident per hour 26 $30 $30 k. Field lights all sports - non-resident per hour aA $36 $36 10. Banquet & Classroom Rental - Community Center & Senior Activity Center: a. Friday evening 5 hour minimum - resident 660 $750 $750 b. Weekend Rates 30 hour minimum - resident 3 300 $1,500 $1,500 C. Extra hours - per hour - resident 44G$150 $150 d. Friday 5 hour minimum - non-resident 760$900 $900 e. Weekend Rates 30 hour minimum - non-resident 444DG $1,800 $1,800 f. Extra hours - per hour - non-resident 460$180 $180 g. KliGheRshaicge PeFhOUF $400 $100 h. g. Banquet Room - Mon - Fri - daytime - resident/hr 3 hour min gb$100 $100 I. h. Banquet Room - Mon - Fri - daytime - non-resident/hr 3 hour min $90 $120 J.i. Damage deposit $550 $550 U $2W $360 m.j. Cancellation Fee - Less than 90 days $550 $550 11. Classroom and Gymnasium Rental - Renton Community Center: a. Resident single gym athletic - per hour $46 $50 $50 b. Non-resident single gym athletic - per hour "0 $60 $60 C. Resident double gym athletic - per hour $90$300 $100 d. Non-resident double gym athletic - per hour $400 $120 $120 e. Resident single gym non -athletic $"a$1,000 $1,000 f. Non-resident single gym nonathletic $6n $1,200 $1,200 g. Resident double gym non -athletic $1400 $2,000 $2,000 h. Non-resident double gym non -athletic $1,350 $2,400 $2,400 I. Carpet fee single gym - resident & non-resident $325 $325 I. Carpet fee double gym - resident & non-resident $650 $650 k. Classroom resident 3&$40 $40 I. Classroom Non-resident 40$48 $48 12. Facility Rental - Neighborhood Center: a. Meeting room - resident $35 $40 b. Gymnasium - resident $35 $40 C. Meeting room - non-resident $40 $48 d. Gymnasium - non-resident $40 $48 13. Farmer's Market a. 10x10 Lot $40 $40 b. Half Lot $20 $20 C. Application fee $30 $30 d. Electrical fee $5 $5 24. Parklet Rentals a. Parklet Rental including Installation per Occurrence' $500 $500 ' Long -Term Right of Way Permit will be required if located within the City Right of Way. See Section XII, Development Fees, of the City of Renton Fee Schedule Brochure: Subsection a of subsection 3 Site Work Utilities and Right of Way Fees 15. Outlying Park Buildings (Tiffany Park Building, Kennydale Park Building, Teasdale Park Building) a. 6-hour block - resident $200 $200 b. 6-hour block - non-resident $240 $240 C. Deposit resident & non-resident $250 $250 d. Non-profit fee - per hour (no deposit required) SECTION e r: FEES $40 2023r' $40 Fees and associated descriptions are published and available in the "Let's Go Renton" Recreation Guide. Vill. AIRPORTs t ' ISECTION 1. Airport Fuel Flow Charge: per gallon $0.08 $0.08 2. JetA Fuel Flow Charge: per gallon $0.10 $0.10 1 r--._-.,._. ­.. __--,.-a", <R SR 4. Hangar wait list, one ti S. Tie -down wait list, one 7. T-Hangar, Non -Refundable Move -in Fee >t:,u & Penalty for violation of Minimum Standards/Airport Rules & Regulations (each occurrence) $500 $500 9. Penalty for Movement Area Incursions (each occurrence), assessed to sponsor/tenant $500 $500 1. Altered Animal Annual License >su »u 2. Unaltered Animal Annual License $50 $50 3. Economically Qualified Resident Special Lifetime License $0 $0 4. Duplicate Tag $10 $10 Please note, impounded animals are subiect to license fees, microchipping costs, and other out-of-pocket costs as specified in RMC 6-6-2. City of Renton Fee Schedule 2023-2024 1. General Business License: a. Registration Fee $150 $150 b. Appeal of Business License Decision 5750 S?sn 2. Penalties: a. The penalty to reinstate an expired business license $50 $50 b. The penalty for failure to obtain a business license $250 $250 C. Failure to pay the license fee within one day after the day on which it is due and payable pursuant to subsection C7 of Chapter 5 of the RMC shall render the business enterprise subject to a penalty of (5%) of the amount of the license fee for the first month of the delinquency and an additional penalty of (5%) for each succeeding month of delinquency, but not exceeding a 5%-15% 5%-15% total penalty of (15%) of the amount of such license fee. for a adult Adult Entertainment Business License b. Entertainer $75 $75 C. Manager $75 $75 d. License Replacement $10 $10 2. Penalties: a. Civil Penalty, per violation $1,000 $1,000 City of Renton Fee Schedule 2023-2024 SECTION XII. DEVELOPMENT FEES 2023 2024 1. BuildiTff Fees: a• Building and Demolition Permit Fees' (i) Base Fee/Valuation$1.00 to$500.00 $42 $42 Ili) Valuation $501.00 to $2,000.00 $42 + $4.70 x each $42 + $4.70 x each $100 value $100 value (ill) Valuation$2001.00 to 25,000.00 $112.57+$21.63 x each $112.57 + $21.63 x each $1,000 value $1,000 value (iv) Valuation $25,001.00 to $50,000.00 $610.06 +$15.57 x each $610.06+ $15.57 x each $1,000 value $1,000 value M Valuation $50,001.00 to $100,000.00 $999.31 + $10.85 x each $999.31 + $10.85 x each $1,000 value $1,000 value (vi) Valuation$100,001.00 to$500,000.00 $1,541.81 + $8.63 x each $1,541.81 + $8.63 xeach $1,000 value $1,000 value (vii) Valuation $500,001.00 to $1,000,000.00 $4,993.81 + $7.33 x each $4,993.81 + $7.33 x each $1,000 value $1,000 value (viii) Valuation $1,000,001.00 and up $8,659.81 + $5.66 x each $8,659.81 +$5.66 x each $1,000 value $1,000 value ' This fee shall be $0 for Accessory Dwelling Units (ADUI. b• Combination Building Permit Fees''' (1) Plumbing up to 3,000 sq ft $317 $317 (ii) Plumbing over 3,000 sq ft $348 $348 (ill) Mechanical up to 3,000 sq ft $254 $254 (iv) Mechanical over 3,000 sq ft $285 $285 M Electrical up to 3,000 sq ft $285 $285 (vi) Electrical over 3,000 sq ft $348 $348 ' This fee shall be $0 for Accessory Dwelling Units (ADU►. ' Combination Building Permit fees are required for each new single family residential structure. C. Building Plan Check Fee' (1) Initial Building Plan Check Fee' 65% of permit fee 65%of permit fee (ii) Additional Building Plan Check Fee 50% of initial plan Check Fee 50% of initial plan Check ' This fee shall be $0 for Accessory Dwelling Units (ADU). ' Building Plan Check Fee is in addition to the building permit fees, demolition permit fees, and combination building permit fees. The plan check fee is equal to 6S% of the building permit fee, or the demolition permit fee, or the combination building permit fee. Includes three (3) review cycles. d. State Building Code Fee: (i) Non-residential projects $25 $25 (ii) Residential projects: (1) Base Residential Fee $6.50 $6.50 (2) Each additional unit after first unit $2 $2 e• Electrical Permit Fees': (i) Residential Fees - Single -Family and Duplex (1) New Service - Single Family and Duplex' (a) Upto200AMP $269 $269 (b) Over 200 AMP $285 $285 (2) Service Changes/New Circuits - Single Family and Duplex: (a) Change up to 200 AMP $209 $209 (b) Change over 200 AMP $221 $221 (c) Any new circuits added to above price is per each up to a maximum of $80.00 $26 $26 (d) Minimum fee for remodel/addition of new circuits without a service charge $209 $209 (e) Cooling system circuit for new or replaced appliance $93 $93 (ii) Multi -Family, Commercial and Industrial Fees: Fees based on value of work. (1) $1.00 to $500.00 $82 $82 (2) $500.01 to$1,000.00 $82+4.89%of value $82+4.89%of value (3) $1,000.01 to 5,000.00 $106.45 + 4.93% of value $106.45 + 4.93% of value Mull$5,000.01 to$50,000.00 $303.78 + 2.58% of value $303.78 + 2,58% of value (5) $50,000.01 to$250,000.00 $1,463.10 + 1.70% of value $1,463.10 + 1.70% of value (6) $250,000.O1to$1,000,000.00 $4,870.92 + 1.45% of value $4,870.92 + 1.45% of value (7) $1,000,000.01andup $15,775.97 + 0.53% of value $15,775.97 + 0.53% of value (ill) Temporary Electrical Services $209 $209 (iv) Miscellaneous Electrical Fees (1) Job Trailers $209 $209 (2) Signs per each $209 $209 (3) Mobile Homes $209 $209 (4) Low Voltage Work (e.g., alarm systems; thermostats; computer, data, or phone lines; fiber optics, cable 50% of commercial fees 50% of commercial fees television, etc.) Minimum $209 Minimum $209 (5) Residential Photovoltaic (PV) Solar Panel (a) Review Fee $135 $135 (b) Permitfee $209 $209 ' This fee shall be $0 for Accessory Dwelling Units (ADU)• ' Exemption: Residential telephone communication systems, thermostats, security systems, and cable television installations are exempt from fees f• House Moving' - minimum per hour Inspection Fee: $190 $190 ' This covers only the Building Section inspection of the structure prior to move. There is a separate additional fee charged by the Public Works Department to cover the actual house move permit. A building permit is also required in order to site the structure on the new site. g. Inspection Fee For Condominium Conversions $190 on 1st unit / $24 each $190 on 1st unit / $24 each add'I unit add'I unit City of Renton Fee Schedule 2023-2024 1. Building Fees: h• Manufactured/Mobile Home Installation Fees': (i) Within a manufactured home park $190 $190 (ii) Outside of a manufactured home park Building Permit Fees Building Permit Fees ' Includes plan review and inspection fees for the foundation (electrical, plumbing, mechanical, sewer and water connection fees are in addition to the below amounts). Mechanical Permit Fees:' (i) Residential - Mechanical Permit base fee plus itemized fees below: $65 $65 (1) Heating system (furnace, heat pump, suspended heater, fireplace, wood stove, etc.). A/C system (air $26 $26 conditioner, chiller or Air Handling Unit (VAV) including ducts and vents (2) Boiler or Compressor $26 $26 (3) Appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for $26 $26 which no other fee is listed in this code (4) Ventilation/exhaust fan $26 $26 (5) Fuel Gas Piping (each gas piping system up to 6 outlets' $26 $26 (ii) Commercial or Multi -Family - Mechanical Permit base fee plus itemized fees below: $96 $96 (1) Heating system (furnace, heat pump, suspended heater, fireplace, wood stove, etc.). A/C system (air $45 $45 conditioner, chiller or Air Handling Unit (VAV) including ducts and vents (2) Boiler or Compressor $96 $96 (3) Refrigeration System $96 $96 (4) Commercial Hood: Installation of each served by a mechanical exhaust, including the ducts for such hood each $96 $96 (5) Incinerator: Installation or relocation of each $127 $127 (6) Appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for $45 $45 which no other fee is listed in this code (7) Fuel Gas Piping (each gas piping system up to 6 outlets; $45 $45 ' This fee shall be $0 for Accessory Dwelling Units (ADU). Plumbing Permit Fees:' (i) Residential - Plumbing Permit base fee plus itemized fees below $65 $65 (1) Per plumbing fixture (e.g., sink, shower, toilet, dishwasher, tub, etc.) or set of fixtures on one trap $12 $12 (2) Water Service: For meter to house $12 $12 (3) Per fixture for repair or alteration of drainage or vent piping $12 $12 (4) Per drain for rainwater systems $12 $12 (5) Per lawn sprinkler system, includes backflow prevention $12 $12 (6) Per vacuum breaker or backflow protection device on tanks, vats, etc. $12 $12 (7) Per interceptor for industrial waste pretreatment $12 $12 (8) Fuel Gas Piping: (each gas piping system up to 6 outlets $26 $26 (ii) Commercial or Multi -Family: Plumbing Permit base fee plus itemized fees below $96 $96 (1) Per plumbing fixture (e.g., sink, shower, toilet, dishwasher, tub, etc.) or set of fixtures on one trap $19 $19 (2) Water Service: For meter to building $19 $19 (3) Per fixture for repair or alteration of drainage or vent piping $19 $19 (4) Per drain for rainwater systems $19 $19 (5) Per lawn sprinkler system, includes backflow prevention $19 $19 (6) Per vacuum breaker or backflow protection device on tanks, vats, etc. $19 $19 (7) Per interceptor for industrial waste pretreatment $19 $19 (8) Fuel Gas Piping: (each gas piping system up to 6 outlets) $33 $33 (9) Medical Gas Piping: (each gas piping system up to 6 outlets) $96 $96 ' This fee shall be $0 for Accessory Dwelling Units IADU). Sign Permit Fees: (i) Permanent Signs: (1) Roof, projecting, awning, canopy, marquee, and wall signs $317 $317 (2) Freestanding ground and pole signs $317 $317 (ii) Temporary and Portable Signs: (1) Real Estate Directional Signs, pursuant to RMC 4-4-10012, permit valid for a 12-months period $96 $96 (2) Grand Opening Event Signs, pursuant to RMC 4-4-10016d(i) $96 $96 (3) Event Signs, pursuant to RMC 4-4-10016d(ii) and (iii) per sign, per promotion $63 $63 (4) A -Frame Signs, pursuant to RMC 4-4-30015 Charge is for the first sign, all subsequent signs are $50.00 $158 $158 (5) Commercial Property Real Estate Banner each sign permit is valid for 12 months. $96 $96 (6) Decorative Flags fee is per entrance and valid until flag(s) are removed $96 $96 Miscellaneous Fees: (i) Inspection Fees (1) Minimum Housing Inspection $158 $158 (2) WABO -Adult Family Home; Misc building inspection $158 $158 (3) Reinspection Fee; Misc building inspection $158 $158 (4) After hours inspection $175/hr $175/hr (ii) Plan Review Fees: (1) Electrical, Plumbing, or Mechanical Permits (percentage of permit fee) 40% 40% (2) Additional Plan Review Fees: Over three review cycles (percentage of plan review fee) 50% 50% (3) Miscellaneous Plan Review: hourly fee. $158/hr $158/hr (4) Site Plan/Zoning Review' S% of Permit Fee 5% of Permit Fee (5) Engineering Review' S%of Permit Fee 5%of Permit Fee (III) Work commencing before permit Issuance: Where work for which the permit is required is started prior to obtaining 2 X Permit Fee 2 X Permit Fee the permit, a special investigation fee in an amount equal to twice the permit fee shall be charged. The special investigation fee shall be paid in addition to the required permit fees ' This fee shall be $0 for Accessory Dwelling Units (ADUI• z Applies to inspection performed on Saturdays, Sundays, observed City of Renton holidays, and non -holiday Monday -Fridays outside the hours of 7:OOAM to 3:30PM City of Renton Fee Schedule 2023-2024 ;SECTION•• • • s 2. Land Use Review Fees: General Land Use Review': (i) Additional Animals Permit $56 $56 (ii) Address Change $120 $120 (iii) Annexation: (1) Lessthan 30 acres $5,900 $5,900 (2) 10 acres or more $5,900 $5,900 (iv) Appeal of: (1) Hearing Examiner's Decision $560 $560 (2) Administrative Decision $560 $560 (3) Environmental Decision $560 $560 (v) Binding Site Plan (total fee for both preliminary and final phases) $5,930 $5,930 (vi) Code Text Amendment (vii) Comprehensive Plan Map or Text Amendment (each) $5,900 $5,900 (viii) Conditional Use Permit: (1) HEX $3,710 $3,710 (2) Administrative $1,800 $1,800 (3) Revision (minor, administrative) 5D%of Application Fee 50% of Application Fee (4) Revision (major) Application Fee Application Fee (ix) Critical Areas Exemption N/C N/C (x) Critical Areas Permit $1,410 $1,410 (xi) Critical Areas Review Fee: for those projects that propose impacts to critical areas and will be billed at the cost of 100% of contract cost 10(rof contract cost contract biologist's review' (xii) Development Agreement $11,240 $11,240 (xiii) Environmental Impact Statement Cost include the coordination, review and appeal. Draft and Final" 100% of cost 100% of cost (xiv) Environmental Checklist Review $1,800 $1,800 (xv) Environmental(SEPA) Addendum $1,800 $1,800 (xvi) Fence Permit (special) $180 $180 (xvii) Grading and Filling Permit (Hearing Examiner) $6,080 $6,080 (xviii) Landscape Review Fee $180 $180 (xix) Legal Lot Segregation N/C N/C (xx) Lot Consolidation $570 $570 ("I) Lot Line Adjustment $1,230 $1,230 (xxii) Manufactured/Mobile Home Park: (1) Tentative $1,230 $1,230 (2) Preliminary $3,650 $3,650 (3) Final $1,800 $1,800 (xxiii) Open Space Classification Request $170 $170 (xxiv) Plats: (1) Preliminary Short Plat $6,080 $6,080 (2) Final Short Plat $3,040 $3,040 (3) Preliminary Plat $12,170 $12,170 (4) Final Plat $6,080 $6,080 (5) Minor Plat Amendment 50% of Application Fee 50% of Application Fee (6) Major Plat Amendment Application Fee Application Fee (xxv) Planned Urban Development: (1) Preliminary Plan $6,080 $6,080 (2) Final Plan $3,030 $3,030 (xxvi) Reasonable Use Exception: (1) In conjunction with land use permit $570 $570 (2) Stand alone $1,730 $1,730 (xxvii) Public Arts Exemption N/C N/C (xxviii) Rezone $5,900 $5,900 (xxix) Routine Vegetation Management Permit without Critical Areas $120 $120 (xxx) Shoreline -Related Permits: (1) Shoreline Permit Exemption N/C N/C (2) Substantial Development Permit $3,030 $3,030 Muh Conditional Use Permit $3,650 $3,650 (4) Variance $3,650 $3,650 (xxxi) Site Development Plan (Site Plan or Master Plan which includes design review fee for projects subject to RMC 4-3-100): (1) Hearing Examiner Review $4,270 $4,270 (2) Administrative Review $3,030 $3,030 (3) Modification (minor, administrative) 50% of Application Fee 50% of Application Fee (4) Modification (major) required new application and repayment of fee required Application Fees Application Fees (xxxii) Small Cell Permit, per site° $570 $570 (xxxiii) Special Permit (Hearing Examiner) $3,030 $3,030 (xxxiv) Street Naming (Honorary) (1) Application $280 $280 (2) Installation $280 $280 (xxxv) Temporary Use Permits: (1) Tier 1 $120 $120 (2) Tier 2 $230 $230 (xxxvi) Variance (per each variance requested) Administrative or Hearing Examiner $1,490 $1,490 (xxxvii) Waiver or Modification of Code Requirements cost is per request $290 $290 (xxxviii) Zoning Compliance Letter $540 $540 City of Renton Fee Schedule 2023-2024 SECTION X11. DEVELOPMENT r) 2023 2024 2. Land Use Review Fees: (Continued) a. General Land Use Review'. (Continued) ' Exception for Projects Vested in the County: For those projects that have vested to a land use permit under the development regulations of King County, the King County Land Use Review Fee Schedule shall apply. and is hereby adopted by reference. A coov of that fee schedule has been filed with the City Clerk and is available at the City Clerk's office for public review. ' Per RMC 4-3-051 the City may charge and collect fees from any applicant to cover costs incurred by the City in review of plans, studies, monitoring reports and other documents related to evaluation of impacts to or hazards from critical areas and subsequent code -required monitoring. ' When the City is the lead agency for a proposal requiring an Environmental Impact Statement (EIS) and the Environmental Review Committee (ERC) determines that the EIS shall be prepared, the City may charge and collect a reasonable fee from any applicant to cover costs incurred by the City in preparing the EIS. The ERC shall advise the applicant(s) of the projected costs for the EIS prior to actual preparation; the applicant shall post bond or otherwise ensure payment of such costs. The ERC may determine that the City will contract directly with a consultant for preparation of an EIS, or a portion of the EIS, and may bill such costs and expenses directly to the applicant. Such consultants shall be selected by mutual agreement of the City and applicant after a call for proposals. If a proposal is modified so that an EIS is no longer required, the ERC shall refund any fees collected under this subsection which remain after incurred costs are paid. The City may collect a reasonable fee from an applicant to cover the cost of meeting the public notice requirements of this Title relating to the applicant's proposal. The City shall not collect a fee for performing its duties as a consulted agency. The City may charge any person for copies of any document prepared under this Title, and for mailing the document, in a manner provided by chapter 42.17 RCW. " Prior to issuance of a small cell permit, the applicant shall pay the actual administrative expenses incurred by the City that are directly related to the City's review of the application, including plan inspection, and approval, as authorized by RCV/ 35.21.81 as may be amended. b. Miscellaneous Fees: (i) Permit review staff overtime (applies only if permit review is requested by the applicant to be performed on $175/hr $175/hr Saturdays, Sundays, observed City of Renton holidays, and non -holiday Monday -Fridays outside of the hours of city staff regular work schedule) ' Exception for Projects Vested in the County: For those projects that have vested to a land use permit under the development regulations of King County, the King County Land Use Review Fee Schedule shall apply. and is hereby adopted by reference. A coov of that fee schedule has been filed with the City Clerk and is available at the City Clerk's office for public review. SECTION XII. DEVELOPMENT FEES CONTINUED ON THE NEXT PAGE City of Renton Fee Schedule 2023 2024 3. Site Work, Utilities, and Right of Way Fees: a. Site Work and Civil Construction Fees: Clearing, Grading, Excavation, and Mining Permits and License Fees: Fees shall be based on the highest tier Tier Grade and Fill Quantity Cleared or Disturbed Am New or Replaced Hard Surface 0 < 50 cy < 7,000 sf < 2,000 sf 1 50 cy -499 cy 7,000 sf-<34acre 2,DDO sf-4,999 sf 2 500 cy -4,999 cy 34ac-<1 at 5,000 sf - clot 3 5000cy -49,999 cV lac-<2.5 ac lac-<2.5 ac 4 50000cy -99,999 cy 2.5 ac-<5ac 2.5 ac-<5 ac 5 1DO,000 cy and larger 5 ac and larger 5 ac and larger Ill Review/Intake Fee: (a) Tier 0 (no permit required) N/A (b) Tier 1 $520 (c) Tier 2 $700 (d) Tier $1,050 (fI Tier $1,400 (e) Tier $1,750 (2) Inspection/Issuance Fee: (a) Tier 0 (no permit required) N/A (b) Tier 1 $500 It) Tier $1,000 (d) Tier $1,330 in Tier $2,660 (e) Tier 5 $3,990 (3) Solid Waste Fills Review Fee': 1.5 x Review/Intake Fee (4) Annual Licenses of Solid Waste Fills Review Fee": 1.5 x Review/Intake Fee Civil construction plan review and inspection fees`'''' (1) $150,000.00 or less 6%of cost (2) Over $150,000.00 but less than $350,000.00 $9,000 a 5% over $150,000 (3) $350,DOO.00 and over $17,500.4%over $350,000 Site Plan/Zoning Review and Inspection Feea' 0.5%of cost Plan Revision following Permit Issuance: N/A $520 $700 $1,050 $1,400 $1,750 N/A $500 $1,000 $1,330 $2,660 $3,990 1.5 x Review/Intake Fee 1.5 x Review/Intake Fee 6% of cost $9,000. 5% over $150,000 $17,500 ♦ 4% over $350,000 0.5%of cost 11) Minor (Results in a change 10% or less than the cost of improvements'. Excludes minor adjustments that are $280 $280 approved by the City to be shown on record drawines.) (21 Major (Results in a change of greater than 10% of the cost of improvements'.) $1,700 $1,700 lv) Wet weather (annuaI fee) $3,000 $3,000 ' The fee for a grading license authorizing additional work to that under a valid license shall be the difference between the fee paid forthe original license and the fee shown for the entire project. ' Any unused fee may be carried forward to the next year. If any work is done before the license is issued, the grading license fee shall be doubled. s All developers, municipal or quasi -municipal entities, or utility corporations or companies, except those specifically exempted, shall pay fees under this Section. Exempted entities include City -franchised cable TV, cable modem, natural ns, telecommunications, and electrical Power. ` Includes three 13) review cycles. Additional reviews will be charged $1,700 each. ' If deemed necessary by the City in its sole discretion, the City will contract with one or more consultants to provide plan reviews and/or inspections with the related costs and expenses payable bythe applicant. ` The fee shall be based up percentage of the estimated cost of improvements. ' Cost of improvements shall be based on the City's bond quantity worksheet and shall include all project related improvements outside of the building envelopes, including, but not limited to, all costs required to construct the following: paved parking lots, private sidewalks or walkways; private and public storm water management facilities; temporary erosion and sedimentation control facilities; water quality facilities; public and private streets; public and private sanitary sewers; public water main improvements; required off -she street, bike and pedestrian improvements; street lighting improvements; required landscaping and street tree improvements; and site grading and mobilization costs. The applicant may elect to submit a separate, itemized cost estimates for each item of improvement subject to the approval by the City. a Fifty Percent 150%) of the fee is due at Civil Construction Permit Application and the remaining shall be due prior to permit issuance. Latecomers' Agreement Application Fees': lil Processing fee' (Nonrefundable) (1) $50,000 or less $1,120 $1,120 (2) Over $50,000 but less than $200,000 $2,250 $2,250 (3) $200,000 and over $4,500 $4,500 (ii) Multi -family: 2 units, Duplexes, & Accessory Dwelling Unit (ADUI' (1) $50,000 or less 15% of total 15% of total (2) Over $50,000 but less than $200,000 10% of total 10% of total (3) $200,000 and over 5% of total 5% of total (iii) Segregation processing fee, if applicable $840 $8W ' Fees are based on the amount covered by the Latecomers. 2 The administration and collection fee is deducted from each individual latecomer fee payment and the balance forwarded to the holder of the latecomers agreement pursuant to RMC 9-5, Tender of Fee. Utility System Development Charges (SDC): (i) Water and Wastewater System Development Charges(SDC) (1) 5/8 x 3/4 inch and 1 inch: (a) Water service fee''° $4,850 $4,850 (b) Fire sprinkler service fee" $648 $648 (c) Wastewaterfee1z $3,650 53,650 (2) 1-1/2 inch: (a) Water service fee $24,250 $24,250 @I Fire sprinkler service fee" $3,238 $3,238 (c) Wastewaterfee° $18,250 $18,250 (3) 2 inch: (a) Water service fee $38,800 $38,800 (b) Fire sprinkler service fee 2'' $5,181 S5,181 (c) Wastewaterfee $29,200 $29,200 10 City of Renton Fee Schedule 2023-2024 3. Site Work. Utilities, and Right of Way Fees: [Continued) Utility System Development Charges (SDC): (Continued) 141 3 inch: (a) Water service fee' (b) Fire sprinkler service fee" (c) Wastewater fee' (5) 4 inch: (a) Water service fee' (b) Fire sprinkler service fee'' (c) Wastewater fee' (6) 6 inch: (a) Water service fee° (b) Fire sprinkler service fee " (c) Wastewater fee' (7) 8inch: (a) Water service fee' (b) Fire sprinkler service fee" (c) Wastewaterfee' III) Storm Water System Development Charges (SDC): (1) New single family residence (including mobile/manufactured homes) & Accessory Dwelling Unit (ADU)' (2) Addition to existing single family residence greater than 500 square feet (including mobile/manufactured homes) Fee not to exceed $2,300 (3) All other uses charge per square foot of new impervious surface, but not less than $2,300 �Id) Utility SOC Segregation Requests [iv) Temporary Utility Connections: (1) Storm Water Fee; Fee equal to thirty percent (30%) of the current SDC applicable to that portion of the $77,600 $10,362 $58,400 $121,250 $16,191 $91,250 $242,500 $32,383 $182,500 $388,000 $51,812 $292,000 $2,300 $0.920 per sq foot $0.920 per sq foot $940 + administrative costs 30% of SDC $77,600 $10,362 $58,400 $121,250 $16,191 $91,250 $242,500 $32,383 $192,500 $398,000 $51,812 $292,000 $2,300 $0.920 per sq foot $0.920 per sq foot $840 + administrative costs property. (2) Wastewater Fee; Annual fee equal to thirty percent 130%1 of the current SDC applicable to the size of the 30% of SDC temporary domestic water meter(s). (3) Water Fee; Annual fee equal to thirty percent (30%) of the current SDC applicable to the size of the temporary 30% of SDC water meter(s). ' This fee shall be reduced by fifty percent ISO%) for Accessory Dwelling Units (ADU). z Based upon the size of the fire sprinkler service (NOT detector bypass meter) ' Unless a separate fire sprinkler service is provided, the system development charge(s) shall be based upon the size of the meter installed and a separate Fire sprinkler service fee will not be charged. 3D% of SDC 30% of SDC 30% of SDC 4 Any parcel that currently has water and or sewer service is eligible for a prorated system development charge is eligible for credit of the existing connection. Feels) based upon meter(,) proposed for final project will be reduced by the feels) based upon meter existing on site. s The applicant shall pay the City's administrative costs for the preparation, processing and recording of the partial payment of the feels). If the same segregation is used for more than one utility's special assessment district, and/or latecomer's charge, then only one administrative fee is collected. ' Temporary connection may be granted for a one-time, temporary, short-term use of a portion of the property for a period not to exceed three (3) consecutive years. Fee shall be paid annually Inon-prorated), and shall be nonrefundable, nontransferable (from one portion of the property to another) and shall not constitute a credit to the system development charge due at the time of permanent use of the utility system. The application for temporary connection shall consist of a detailed plan and a boundary line of the proposed development service area for use in the fee determination. d. Utility Construction Permit Fees: (i) Water Construction Permit Fees: (1) Water Testing, Construction, and Administration Fees: (a) Water meter tests for 3/4" to 2" meter $50 $50 (b) Water meter tests on meters 2" or larger $60 deposit + $60 deposit + time and materials time and materials (c) Open and close fire hydrants for fire flow tests conducted by others. Time and materials Time and materials (d) Water service disconnection (cut at main) $275 $275 (e) Meter resets $95 $95 (f) Repair of damage to service $250 $250 (g) Water main connections $560 $560 (h) Water main cut and cap $1,025 $1,025 (i) Water quality/inspection/purity tests $80 $80 (j) Specialty water tests (lead, copper, etc) Cost of test+ Cost of test + $70 processing fee $70 processing fee (k) Water turn ons/offs after hours $185 $185 (1) Installation of isolation valve. $2,000 deposit+ $2,000 deposit + time and materials time and materials (m) New water line chlorination fee. Fee plus $0. 15 per lineal foot for any footage after the first two hundred $250 + $0.15 per lineal foot $250 +$0.15 per lineal foot fifty (250) lineal feet (n) Miscellaneous water installation fees. Time and materials Time and materials (o) Service size reductions $50 $50 (p) Installation fees for ring and cover castings $200 $200 (2) Water meter installation fees- City installed: (a) 3/4" meter installed by City within City limits.' (1) Installation of stub service and meter setter only. $2,875 $2,875 Qil Drop in meter only $400 $400 (b) 3/4" meter installed by City outside City limits' (i) Installation of stub service and meter setter only. $2,935 $2,935 (II) Drop in meter only $400 $400 (c) 1" meter installed by the City.' 11) Installation of stub service and meter setter only. $2,875 $2,875 fill Dropinmeteronly $460 $460 (d) 1-1/2" meter installed by the City. III Installation of stub service and meter setter only $4,605 $4,605 III) Drop in meter only $750 $750 m City of Renton Fee Schedule 2023-2024 3. Site Work, Utilities, and Right of Way Fees: (Continued) d. Utility Construction Permit Fees: (Continued) (e) 2" meter installed by the City. (i) Installation of stub service and meter setter only. $4,735 $4,735 (ii) Drop in meter only $950 $950 (3) Water meter processing fees — Applicant installed: For meters larger than 2", the applicant must provide $220 $220 materials and install the meter. (4) Hydrant Meter fees: (a) Hydrant meter permit fee $50 $50 (b) Deposits: (i) 3/4" meter and backfiow prevention assembly. $500 $500 (H) 3" meter and backfiow prevention assembly. $2,000 $2,000 (iii) Deposit processing charge, nonrefundable. $25 $15 (cl Meter rental (begins on day of pickup): (1) 3/4" meter and backnow prevention assembly. Per month. $50 $50 111) 3" meter and backflow prevention assembly. Per month. $250 $250 Wastewater and Surface Water Construction Permit Fees': (1) Residential: (a) Wastewater permit fee $375 $375 (b) Surface water permit fee $375 $375 (2) Commercial: (a) Wastewater permit fee $375 $375 (b) Surface water permit fee $375 $375 (3) Industrial: (a) Wastewater permit fee $375 $37S III) Surface water permit fee $375 $375 (4) Repair or modification of any of the above (a) Wastewater permit fee $375 $375 (b) Surface water permit fee $375 $375 (5) Cut and Cap/Demolition Permit: (a) Wastewater permit fee $375 $375 (b) Surface water permit fee $375 $375 (6) Reinspection for Wastewater or Surface Water Permits $375 $375 (7) Ground water discharge (temporary connection to wastewater system for discharge of contaminated ground $375 $375 water over 50,000 gallons) Rate plus billed for current Renton and King County sewer rate on discharged plus King County sewer rate on discharged amount plus King County sewer rate on discharged amount (meter provided by property owner) amount (iv) Street light system fee, per new connection to power system $525 $525 Iv) Utility Locate Refresh Fee (Fee is due each time excavator calls in for locate refresh during 45-day locate ticket) (1) Standard locate $500 $500 (2) Large project locate $1,000 $1,0D0 ' This fee shall be $0 for Accessory Dwelling Units (ADUI. ' This fee shall be reduced by fifty percent (50%) for Accessory Dwelling Units (ADU). Right of Way (ROW) Use Permits Fees' 0) Franchise Permit Fees: (1) Master Service Agreement Application Fee' $5,620 $5,620 (2) Franchise Permit Fees: ♦s (a) Small work, including trenching less than 60 linear feet or installation of 6 or less utility poles $670 $670 (bl All other work, permit fee plus staff time per hour $670. Time and Materials $670 . Time and Materials (c) Other public agencies constructing utilities within City right-of-way $670 $670 13) Small Cell Master Lease Agreement including Site License Addendum and Small Cell Permits (a) Master Lease Agreement Administrative Costs, Staff time per hour and/or cost of materials.' Time a and Materials Time and Materials a (b) Pole Reservation, per pole $135 $135 (c) Administrative Fee, Base plus time and/or cost of materialas $850 deposit. Time and Materials $850 deposit. Time and Materials Jill Public Reimbursement (any costs incurred by the City on behalf of the permit applicant for installation or operation of site equipment) V.) Electrical service (annual fee) I1) Tier 1, Daily peak kWh <20 $715.39 $715.38 12) Tier 2, Daily peak kWh 21 -40 $1,430.76 $1,430.76 13) Tier 3, Daily peak kWh 41-60 $2,146.14 $2,146.14 (4) Tier 4, Daily peak kWh 61 - 80 $2,861.51 $2,961.51 (5) Tier S, Daily peak kWh>81 $3,576.89 $3,576.89 (ii) All other reimbursement Actual cost Actual cost (e) Site License Addendum Rent $270 $270 (f) All other tees` Actual cost Actual cost (4) Conduit Lease Rates per Lineal Foot (annual fee): (a) Tier 1, conduit in existing planter strips $10.00 $10.00 (b) Tier 2, conduit outside of planter strips excluding signalized intersection crossings, bridges and train tracks $20.00 $20.00 (c) Tier 3, conduit within signalized intersection crossings, bridges and train tracks $30.00 $30.00 IiH Short -Term ROW Permit Fees Iduration 30 days or less)'''. (1) Single family residence, one unit only $370 $370 (2) All other uses, excluding those listed $700 $700 (3) Wastewater or storm water service $375 $375 12 City of Renton Fee Schedule 2023-2024 3. Site Work, Utilities, and Right of Way Fees: (Continued) e• Right of Wav Use Permits Fees' (Continued) (III) Long Term ROW Permit Fees (duration over 30 days)': (1) Duration greater than thirty (30) days but no more than one (1) year: (a) Within City Limits"; Short -Term ROW Permit Fee associated with use plus leasehold excise tax (LET)' Short -Term ROW Short -Term ROW Permit Fee . LET' Permit Fee + LET' (b) King County ROW Permits/Inspections: (I) Service Installation Only $1,025 $1,025 (ii) Utility Extension per 100' of Length (Min 200' Length) $1,025 $1,025 Duration greater than one (1) yeart10: (i) Single family and two family uses"; fee assessed annually plus leasehold excise tax (LET)', if $50+ LET' $50+ LET' applicable All uses without public benefit; fee is a per month charge assessed annually based on property value" 0.5%x Value13 + LET' 0.5%x Values' + LET' of land to be utilized, plus leasehold excise tax', if applicable. (in) All other uses; fee is a per year charge of assessed value of land adjoining the property", plus C.5%x Value" + LET' 0.5%x Values' + LET' leasehold excise tax', if applicable. In no case less than $50.00. IN) Oversize Load Permits $10 $10 ' Bond required pursuant to RMC 940-5 ' Work and/or use of the right of way, including those associated with a Civil Construction Permit and excludes utilities from other public agencies and service providers which shall be considered under is franchise permit. ' The fixed application fee established herein is intended to coverthe City's internal administrative costs in processing and administering the franchise. In addition to the fixed application fee, the City may require applicants to either directly pay or reimburse the City for external costs reasonably incurred to process the application and/or administer the franchise agreement. The City may require applicants to deposit funds in advance to cover legal and/or other omfessi,nal services fees as thev are incurred. ° The City may decide to contract with a consultant to perform plan reviews and inspections and may bill such costs and expenses directly to the applicant. ' If a franchise agreement does not specify the fee amount, the generic fee, as identified in this fee schedule, shall be collected. ° Regular hours and standard after hour and overtime fees apply. 'A no fee permit may be issued for the following' individual homeowners performing work in street ROW for street tree or parking strip irrigation systems; residential moving pods or moving trucks provided that they are in the ROW for no more than three (3) days; use in CD zone provided ground disturbing activity is not proposed; and work associated with City of Renton capital improvement projects or City funded projects. ° A no fee permit may be issued for the following: A public agency and when the proposed use of the right-of-way provides a direct service to the public (e.g., Metro applications for right-of-way for bus shelters); and work associated with City of Renton capital improvement oroiects or City funded projects. s Leasehold excise tax (LET) imposed pursuant to Chapter 82.29A RCW on leasehold interests for the use of real or personal public property shall be collected from the permittee at a rate established by the State of Washington. 10 Insurance Required: Public Liability and property damage insurance is also required pursuant to RMC 9-2-58, Minimum Permit Requirements for Excess Rightof-Wav Use. ss Except those single family and two family uses that utilize right of way along a waterfront. " Right-of-way value shall be based on the assessed value of the land adjoining the property as established by the King County Assessor. f. Release of easement fees: The imposition, collection, payment and other specifics concerning this charge are detailed in chapter 9-1 RMC, Easements. (0 Filing fee (iil Processing fee Street and Alley vacation Fees: The imposition, collection, payment and other specifics concerning this charge are detailed in chapter 9-14 RMC, Vacations. (i) Filing fee (ijl Processing and completion fee, payable upon Council approval of the vacation and upon administrative determination of appraised value of vacated rightof-way. Appraised Value of Vacated right-of-way: (1) Less than $25,000 (2) $25,000 to$75,000 (3) Over$75,000 Miscellaneous Fees: W Street Frontage Improvements Fee -In -Lieu's (1) All eligible uses except Single Family Additions less than 1,160 sq ft: (a) Street with existing storm drainage main line (b) Street with existing conveyance ditch (2) Single Family Additions less than 1,160 Sq Ft' Proportional share of the fee in lieu of all eligible uses fee based $280 5280 $280 $280 $560 $560 $840 $840 $1,410 $1,410 $2,250 $2,250 $130/LF $130/LF $150/LF $150/LF (Sq Ft of addition / 1,160 sq ft) of Fee-m-lieu (Sq Ft of addition / 1,160 sq ft) of Fee-in-Reu n square footage of addition. (ii) Re -inspection Fee $158 $158 (III) Inspection for Unscheduled Work' $158 $158 (iv) Regular Staff Review and Inspection Hours' $158/hr $158/hr (y) After hours inspection° $175/hr $175/hr (VI) Permit review staff overtimes $175/hr $175/hr (vii) Public Works Reimbursements Actual cost Actual cost (viii) Standard or minor drainage adjustment review $670 $670 ' This fee shall be $0 for Accessory Dwelling Units IADU). ' Unscheduled work includes, but is not limited to, site work that is found to be occurring, or did occur, for which an inspection was not scheduled. Fee is sublect to be applied for each occurrence but does not replace a stop work order or other code violation as determined applicable by the City. The fee is in addition to any other applicable inspection fees. The fee may provide day of inspection at the discretion and availability of the City inspector. s Applies only to those fees that am noted as time and materials and performed during city staff regular work schedule. ° Applies to inspections performed on Saturdays, Sundays, observed City of Renton holidays, and non -holiday Monday -Fridays outside the hours of 7:DOam to 3:30pm. ' Applies only R permit review is requested by the applicant to be performed on Saturdays, Sundays, observed City of Renton holidays, and non -holiday Monday -Fridays outside of the hours of city staff regular work schedule 'Any work performed by City forces or under City contract on behalf of a permit applicant to repair damage to the City infrastructure or caused by the permit applicant or contractor under its control, or any and all roadway or right-of-way cleanup efforts performed by City forces or under City contract that resulted from the work performed by the permit applicant or contractors under its control. 13 City of Renton Fee Schedule 2023-2024 'SECTIONDEVELOPMENT • •) 2023 2024 4. Technology Surcharge Fee An additional technology surcharge shall be required for all fees included in the following Subsections of Section XII, Development 5.0% 5.0% Fees, of the City of Renton Fee Schedule Brochure: Subsection 1, Building Fees; Subsection a, except for appeals, critical areas review fee, and direct EIS costs, of subsection 2, Land Use Review Fees; Subsections a, b, c(iii), d, and e, except Master Franchise/Small Cell Permit Application Fee and Long Term ROW Permit Fees (duration over one year), of subsection 3, Site Work, Utilities, and Right of Way Fees; and Section Kill, Fire Department Fire Marshall Fees S. Impact Fees: a. School Impact Fees: (i) Issaquah School District (1) Single Family Fee $11,377 $11,377 (2) Multi Family, Duplex, & Accessory Dwelling Fee (ADU) $4,718 $4,718 (ii) Kent School District (1) Single Family Fee $0.00 $0.00 (2) Multi Family, Duplex, & Accessory Dwelling Fee (ADU) $0.00 $0.00 (iii) Renton School District (1) Single Family Fee $2,911 $2,911 (2) Multi Family, Duplex, & Accessory Dwelling Fee (ADU)' $3,697 $3,697 (iv) School Impact Fee Administration 5%x School Impact Fee 5%x School Impact Fee ' This fee shall be $0 for Accessory Dwelling Units (ADU). b. Transportation Impact Fees: (i) Light Industrial, per sq foot $10.68 $10.68 (ii) Apartment, per dwelling & Accessory Dwelling Unit (ADU)' $7,550.02 $7,550.02 (iii) Church, per sq foot $6.02 $6.02 (iv) Coffee/Donut Shop, no drive up, per sq foot $248.51 $248.51 (v) Coffee/Donut Shop, with drive up, per sq foot $261.04 $261.04 (vi) Condominium & Duplexes per dwelling $6,345.23 $6,345.23 (vii) Convenience market - 24 hour, per sq foot $249.31 $249.31 (viii) Daycare, per sq foot $54.94 $54.94 (ix) Drinking Place, per sq foot $69.16 $69.16 (x) Drive-in bank, per sq foot $157.10 $157.10 (xi) Fast food, no drive -up, per sq foot $159.44 $159.44 (xii) Fast food, with drive -up, per sq foot $203.13 $203.13 (xiii) Gas station with convenience store, per pump $73,411.90 $73,411.90 (xiv) Gas station, per pump $98,150.27 $98,150.27 (xv) General office, per sq foot $16.39 $16.39 (xvi) Health/fitness club, per sq foot $40.49 $40.49 (xvii) Hospital, per sq foot $8.76 $8.76 (xviii) Hotel, per room $4,819.16 $4,819.16 (xix) Manufacturing, per sq foot $8.04 $8.04 (xx) Marina, per boat berth $2,570.22 $2,570.22 (xxi) Medical office, per sq foot $37.02 $37.02 (xxii) Mini -warehouse, per sq foot $2.89 $2.89 (xxiii) Mobile home, per dwelling $7,228.75 $7,228.75 (xxiv) Motel, per room $4,417.57 $4,417.57 (xxv) Movie theater, per seat $722.88 $722.88 (xxvi) Nursing home, per bed $2,007.98 $2,007.98 (xxvii) Restaurant: sit-down, per sq foot $68.51 $68.51 (xxviii) Senior housing - detached, per dwelling $3,293.10 $3,293.10 (xxix) Shopping center, per sq foot $29.88 $29.88 lux) Single family house, per dwelling $12,208.54 $12,208.54 (xxxi) Supermarket, per sq foot $73.97 $73.97 (xxxii) Net New PM Peak Hour Person Vehicle Trip (Proposed - Existing), per PM Peak Hour Person Vehicle Trip $8,031.94 $8,031.94 ' This fee shall be $0 for Accessory Dwelling Units (ADU). C. Park Impact Fees: (i) Single family $3,276.44 $3,276.44 (III Multi -family: 2 units, Duplexes, & Accessory Dwelling Unit (ADU)' $2,659.70 $2,659.70 (iii) Multi -family: 3 or 4 units $2,531.21 $2,531.21 (iv) Multi -family: 5 or more units $2,222.84 $2,222.84 (v) Mobile home $2,325.63 $2,325.63 ' This fee shall be $0 for Accessory Dwelling Units (ADU). Fire Impact Fees: (i) Residential - single family (detached dwellings & duplexes), per dwelling unit $829.77 $829.77 (ii) Residential - multi family & Accessory Dwelling Unit (ADU)', per dwelling unit $964.53 $964.53 (iii) Hotel/motel/resort, per sq foot $1.29 $1.29 (iv) Medical care facility, per sq foot $3.92 $3.92 (v) Office, per sq foot $0.26 $0.26 (vi) Medical/dental office, per sq foot $1.99 $1.99 (vii) Retail, per sq foot $1.25 $1.25 (viii) Leisure facilities, per sq foot $2.36 $2.36 (ix) Restaurant/lounge, per sq foot $5.92 $5.92 (x) Industrial/manufacturing, per sq foot $0.15 $0.15 (xi) Church, per sq foot $0.56 $0.56 (xii) Education, per sq foot $0.72 $0.72 (xiii) Special public facilities, per sq foot $4.48 $4.48 •(i)-(ii) is per unit •(iii)-(xiii) is per square foot ' This fee shall be $0 for Accessory Dwelling Units (ADU). 14 City of Renton Fee Schedule 2023-2024 SECTIONDEVELOPMENT FEES (CONTINUED)r2024 5. Impact Fees: (Continued) e. Independent Fee Calculation Review (or unless otherwise established by School District or Renton Regional Fire Authority) $560 $560 f. Impact Fee Deferral Administration: (i) Each Lot, Single Family Dwelling, or Condominium $100 $100 (ii) Each Multi -family Building $100 $100 6. Miscellaneous Fees a. Multifamily Tax Exemption Application $1,000.00 $1,000.00 b. Tree Fee in lieu, credit replacement, and/or credit supplement (i) Per diameter inch measured at 4.5 feet above grade $225.00 $225.00 (ii) Labor cost for each 2" caliper (or 6ft tall) tree to be planted $500.00 $500.00 a. Fire plan review and inspection fees: (i) $0 to $249.99 $50 $50 (ii) $250.00 to$999.99 $50+2%of the cost $50+2%of the cost (iii) $1,000.00 to $4,999.99 $75 + 2% of the cost $75 + 2% of the cost (iv) $5,000.00 to$49,999.99 $200+1.5%of the cost $200+1.5%of the cost (v) $50,000.00 to $99,999.99 $450 + 1.2% of the cost $450 + 1.2% of the cost (vi) $100,000.00 and above $950+.75%of the cost $950+.75%of the cost (vii) Construction Re -inspection. Fee is per hour with a 2 hour minimum. The minimum may be assessed if She $175 $175 requested inspection does not meet the approval of the inspector. (viii) Violation/Second Re -Inspection after 30-day period (whenever 30 days or more have passed since Fire Department $150 $150 notification of a violation, which required a first re -inspection, and such violation has not been remedied or granted an extension) (ix) Third and subsequent re-Inspection/Pre-Citation Follow -Up Inspection when re -inspections are required beyond $250 $250 the first and second re -inspections (x) Preventable Fire alarm fee: (1) First, second, and third preventable alarms N/C N/C (2) Fourth and fifth preventable alarms in a calendar year, fee is per each alarm. $75 $75 (3) Sixth preventable alarm and successive preventable alarms in a calendar year, fee is per each alarm. $150 $150 (xi) Late Payment Penalty $35 $35 b. Fire Permit type: (i) Operational fire code permit (issued in accordance with Section 105.6 of the IFC) fee is yearly (includes items such $150 $150 as fire special events, covered stages, mobile food facilities, hot works, etc.) (ii) Permits for Mobile food facilities that have passed a fire and life safety inspection in another jurisdiction that has $75 $75 reciprocity with Renton RFA (iii) Hazardous materials and HPM facilities yearly $250 $250 (iv) Construction permit: 20% of plan review fee - 20% of plan review fee - Min. $75 Min. $75 (v) Hazardous production materials permit (for businesses storing, handling, or using hazardous production materials $250 $250 as regulated in the fire code) permit is yearly (vi) Underground tank removal permit (commercial) See Fire plan review and See Fire plan review and construction permit fees construction permit fees (vii) Underground tank removal or abandonment -in- place permit (residential) $200 $200 (viii) Other requested inspection when not required by the fire code. Fee is per hour with a minimum 1 hr when $175 $175 approved by the Fire Marshal, such as home daycares (ix) (Vill) Non -emergency Billable Services (ie: boat assists, etc) Rates published at: WFC Current Wage and WFC Current Wage and www.washingtonfirechiefs.com Equipment Rate Equipment Rate (x) NSF check fees $25 $25 (xi) RFA technology surcharge fee applied to Fire Department Fire Marshal Fees, subsection a. (i, ii, iii, iv, v, vi) and 5% 5% subsection b. (iii) 15 City of Renton Fee Schedule 2023-2024 ,SECTION•NETARY PENALTY SCHEDULE FOR INFRACTIONS ISSUED UNDER THE AUTHORITYOF :1 2023 2024 1. Effect of Schedule. This schedule establishes default base penalties for violations of the Renton Municipal Code that are issued as infractions under the authority of RCW 7.80 RCW, but these penalties do not include any state -imposed statutory assessments. Except as otherwise prohibited by law or court rule, a court with jurisdiction over the infraction may impose on a defendant a lesser penalty in an individual case. Provided that, whenever the base penalty plus mandatory statutory assessments results in a total payment that is not an even dollar amount, the base penalty is deemed to be amended to a higher amount which produces the next greatest even dollar total 2. Penalties Established by Court Rule or Specific Penalty Established by law. This schedule does not apply to penalties established by state or local court rule or to a penalty that is established in law with a specific amount (i.e. ordinance or statute setting a penalty equal to a specified amount rather than a penalty up to a maximum amount). To the extent a penalty scheduled herein conflicts with a state or local court rule or a penalty that is established in law, this schedule shall be deemed preempted by the court rule or penalty established in law 3. Penalties: The following violations shall carry the following listed default base penalty, not including statutory assessments: a. Violation of Park Rules (Civil Infraction) RMC 2-9-S.0 $73 $73 I. Activities Prohibited in a Park RMC 2-9-S.C.1 $73 $73 ii. Disregard Park Trail Sign RMC 2-9-S.C.2 $73 $73 iii. Unauthorized Vehicle in a Park RMC 2-9-8.C.3 $73 $73 iv. Operating Motorized Vehicle on Park Trail RMC 2-9-8.C.4 $73 $73 V. Dismount Zone Violation RMC 2-9-S.C.5 $73 $73 vi. Speeding on Trails RMC 2-9-S.C.6 $73 $73 vii. Vehicle/Boat Repair in Park RMC 2-9-8.C.7 $73 $73 viii. Racing in Park RMC 2-9-8.C.8 $73 $73 ix. SCUBA Diving in Park RMC 2-9-8.C.9 $73 $73 X. Camping/Overnight Stay in Parks RMC 2-9-8.C.10 $73 $73 A. Fire/Barbeque in Park RMC 2-9-S.C.11 $73 $73 xii. Metal Detecting RMC 2-9-8.C.12 $73 $73 xiii. Glass Container in Park with Swimming Area RMC 2-9-8.C.13 $73 $73 xiv. Group Rally/Special Use Permit RMC 2-9-8.C.14 $73 $73 xv. Parking & Mooring Violation RMC 2-9-8.C.15 $73 $73 xvi. City Events Violation RMC 2-9-S.C.16 $73 $73 xvii. Alcohol in Park RMC 2-9-8.C.17 $73 $73 xviii. Smoking in Park RMC 2-9-S.C.17 $73 $73 b. Possession/Sale/Discharge of Fireworks RMC 4-5-070.C.102 $49 $49 c. Animal Control —No License RMC 5-4.1 $49 $49 d. Littering RMC 6-14-22 $50 $50 I. Litter in Public Spaces RMC 6-14-3 $50 $50 ii. Placement of Litter in Receptacles RMC 6-14-4 $50 $50 iii. Sweeping Litter in Gutters RMC 6-14-5 $50 $50 iv. Merchants' Duty RMC6-14-6 $50 $50 V. Litter Thrown By Persons in Vehicles RMC 6-14-7 $50 $50 A. Truck Loads Causing Litter RMC 6-14-8 $50 $50 vii. Litter in Lakes and Fountains RMC 6-14-10 $50 $50 viii. Throwing/Distributing Commercial Handbills in RMC6-14-11 Public Places $50 $50 ix. Placing Handbills on Vehicles RMC 6-14-12 $50 $50 X. Depositing Handbills on Uninhabited/Vacant RMC 6-14-13 Premises $50 $50 xi. Prohibiting Distribution of Handbills Where RMC 6-14-14 Properly Posted $50 $50 xii. Distributing Handbills at Inhabited Private Premises RMC 6-14-15 $50 $50 xiii. Dropping Litter from Aircraft RMC 6.14-16 $50 $50 xiv. Posting Notices Prohibited RMC 6-14-17 $50 $50 xv. Litter on Occupied Private Property RMC 6-14-18 $50 $50 xvi. Owner to Maintain Premises Free of Litter RMC 6-14-19 $50 $50 xvii. Litter of Vacant Lots RMC 6-14-20 $50 $50 e. Animal Control —Animal at Large RMC 6-6-1.A $49 $49 f. Animal Control —Animal/Fowl Habitual Noise RMC 6-6-S.A $49 $49 g. Encroachment on Public Property RMC 9-17-30 $100 $100 h. Negligent Operation of Watercraft RMC 9-3-5 $42 $42 I. Speed Regulations of Watercraft RMC9-3-7 $42 $42 J. Obstructions of Waterways RMC 9-3-10 $122 $122 It. Equipment Numbering Violation RMC 9-3-26 $42 $42 I. Violation of Rules of the Road RMC 9-3-31 $42 $42 m. Inattentive Driving RMC 10-12-25 $67 $67 n. Truck Route Violation RMC 10-12-26 $42 $42 o. Avoiding Intersection RMC 10-12-27 $42 $42 p. Unsafe Use of Scooter RMC 30-12-28.0 $42 $42 q. Use of Scooter Where Prohibited RMC 10-12-28.D $42 $42 r. Use of Scooter Without a Helmet RMC 30-12-28.E.1 $42 $42 S. No Reflectors on Scooter RMC 10-12-28.E.2 $42 $42 t. No Muffler on Scooter RMC 10-12-28.F $42 $42 U. Scooter Operator Under Age 13 RMC 10-12-28.G $42 $42 V. Operating Scooter When Prohibited RMC 10-12.28.H $42 $42 w. Violation of ATV Ordinance RMC 10-2-5 $47 $47 All other violations identified by Renton Municipal Code as an infraction not listed or otherwise specified by court rule or law. $48 $48 16