HomeMy WebLinkAboutWilliams Bid - Addendum No 2Downtown Core Streetscape Phase 2 – Williams Ave South Addendum No. 2
Page 1 of 1
DOWNTOWN CORE STREETSCAPE PHASE 2 - WILLIAMS AVE SOUTH
ADDENDUM NO. 2
CAG-23-241
DATE OF ADDENDUM ISSUE: July 19, 2023
DUE DATE FOR BIDS: July 20, 2023
DATE OF BID OPENING: July 24, 2023
NOTE TO ALL PLANHOLDERS:
This Addendum No. 2, containing the following revisions, additions, deletions, and/or clarifications, is
hereby made a part of the Plans and Contract Provisions (Contract Documents) for the above-named
project. Bidders shall take this Addendum into consideration when preparing and submitting their bids.
Bidders shall acknowledge receipt and acceptance of this Addendum No. 2 in the space provided on the
Proposal Signature Page or by signing in the space provided below and submitting the signed addendum
with the bid package. Failure to provide this written acknowledgment may result in disqualification of the
Bidder’s submittal.
SPECIAL PROVISIONS
1. DELETE Page SP-99 and REPLACE with attached Page SP-99. Revisions include:
· Delete the requirement for the application of anti-graffiti coating under Special Provision
Section 6-07.2(1).
ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT.
Sincerely,
Michael Sippo
Civil Engineer III
City of Renton
Receipt acknowledged, and conditions agreed to this _____ day of ________, 2023
Bidder _______________________________
Signature
Michael Sippo 7/19/23
Special Provisions – Bid Document SP-99
Downtown Core Streetscape Phase 2 – Williams Avenue South June 2023
Luminaire Poles and
Bases
9-29.10(2)A
Decorative
Pedestrian
Luminaire and arm
assembly, flower
basket arms and
banner arms
RAL 9005TX “Jet Black”
Per Section 6-07.2(1)
of these Special
Provisions
Galvanizing
All fabricated steel components and materials to be galvanized per ASTM 123.
All steel hardware components and materials to be galvanized per ASTM 153.
Paint materials shall comply with the requirements in Section 9-08 unless described in this
section.
6-07.2(1) Materials for Signal and Luminaire Poles, Luminaires, Terminal Cabinets and
Video Detection Systems
The Contractor shall provide a swatch paint sample from the pole manufacturer for use as a
color match for the Engineer’s approval prior to factory finish coating. Contractor shall also
provide two gallons of touch-up paint to the City.
Painting plan submittals shall be per Standard Specifications Section 6-07 Painting.
Steel Poles and Steel Sub-Assemblies Paint Specifications:
Steel poles and sub-assemblies shall be factory galvanized, primed and finished with powder
coating per Section 6-07 and section 9-08 of the Standard Specifications.
Aluminum Poles, Aluminum Sub-Assemblies and Aluminum Luminaire Housings
Specifications:
Aluminum poles, luminaires, terminal cabinets and other aluminum components shall be
factory primed and painted with polyester powder coating to recommended industry standards
and shall meet AAMA 2604 performance requirements and test procedures.