DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Plan LUA19-000062
Satisfied
PLN - Administrative Decision Condition
1. The applicant shall submit a final detailed landscape plan in compliance with RMC 4 -8-120D.12 at the time of Civil
Construction Permit application that includes the following:
a. Required street trees within the public ROW of Duvall Ave NE, and within the planter strip of NE 24PPthPP
Street, to the east of the proposed stormwater vault; and
b. Two (2) additional trees on Lot 2 in order to meet the minimum tree density requirement of four (4) trees onsite.
Comments: A final detailed landscape plan was submitted, reviewed, and approved on February 19, 2021, under
the Civil Construction Permit (C20000816). The street trees and additional required trees were provided as part
of that design and installed.
2. The applicant shall either: 1) Install the required onsite landscaping on Lot 2 prior to short plat recording, or, 2) Submit
for and finalize a demolition permit for the existing single-family residence prior to short plat recording.
Comments: The required onsite landscaping on Lot 2 has been installed per the approved landscape plan.
3. The applicant shall submit a revised site plan with the civil construction permit application that demonstrates
compliance with the driveway width and surface standards for Lot 2.
Comments: A revised site plan was submitted, reviewed, and approved on February 19, 2021, under the Civil
Construction Permit (C20000816) that is in compliance with the driveway width and surface standards for Lot 2.
4. The applicant shall install a cedar fence between the new public half -street (NE 24PPthPP Street) and the private
street to the north. The cedar fence shall be identified on the civil construction permit application, for review and
approval by the Current Planning Project Manager, prior to Civil Construction Permit issuance. The cedar fence shall
be installed prior to short plat recording.
Comments: A cedar fence was submitted, reviewed, and approved on February 19, 2021, under the Civil
Construction Permit (C20000816). The cedar fence has been installed as permitted.
5. The applicant shall provide a safe route to school plan for review and approval by the Current Planning Project
Manager prior to construction permit issuance.
Comments: A safe route to school plan has been submitted, reviewed and approved on February 19, 2021, under the
Civil Construction Permit (C20000816). A deferral permit (DEF23001287) was issued on March 11, 2023, with an
expiration of September 29, 2023.