HomeMy WebLinkAbout7945.04 E 2023 0717Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 2 Report ID 7945.04 E 2023 0717 Date Mon 7/17/2023 Weather 75°F Clear Arrival/Departure Time(s) 9:15AM; 10AM Travel Time (hr)1.0 Project Name Canopy Property Location 413 Lincoln Ave NE, Renton ESNW Rep. & Phone Willem Scherwin | 206 793 8569 Client Info/Contact Century Communities | Stacia Bloom General Contractor Info/Contact Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. ESNW rep was onsite to observe water main backfill in alley 2. Water Main Backfill ESNW rep was onsite to observe and test the backfill of water main onsite. ESNW rep observed the contractor had excavated approximately 3’ in depth to place the water main in alley 2. Rep observed the contractor excavating into native tan sandy silt with gravel. ESNW rep observed the contractor backfill the excavation in approximately 12” lifts and compact the fill with a medium sized hoe pack. ESNW rep took compaction tests and observed adequate compaction of least 95% of the modified proctor at the specific tested locations. Please see map and table below. Test Number Test Location Elevation Reference Proctor Maximum Dry Density (pcf) Test Moisture (%) Test Dry Density (pcf) % of MDD 162 Water Main Backfill SG 9 128.5 12.1 121.5 95 163 Water Main Backfill SG 9 128.5 11.5 121.7 95 164 Water Main Backfill SG 9 128.5 12.4 122.1 95 165 Water Main Backfill SG 9 128.5 11.7 122.8 96 Report ID 7945.04 E 2023 0717 Page 2 of 2 Earth Solutions NW, LLC 162 163 164 165