HomeMy WebLinkAbout2023-2024 Fee Schedule_2023 Q2City of Renton Fee Schedule
2023‐2024
Rev. July 2023
City of Renton Fee Schedule
2023‐2024
Table of Contents Page
SECTION I. MISCELLANEOUS FEES 1
SECTION II. MAPLEWOOD GOLF COURSE 2
SECTION III. CITY CENTER PARKING FEES 2
SECTION IV. AQUATIC FEES 3
SECTION V. CARCO THEATER (REPEALED) 3
SECTION VI. PARKS AND FACILITIES USE AND RENTAL 3
SECTION VII. COMMUNITY CENTER PASS CARD & FEES 4
SECTION VIII. AIRPORT CHARGES 4
SECTION IX. ANIMAL LICENSES FEES* ‐ RMC 5‐4‐24
SECTION X. BUSINESS LICENSES 5
SECTION XI. ADULT ENTERTAINMENT LICENSES 5
SECTION XII. DEVELOPMENT FEES 6
Building Fees:6
Land Use Review Fees:8
Site Work, Utilities, and Right of Way Fees: 10
Technology Surcharge Fee 14
Impact Fees: 14
Miscellaneous Fees: 15
SECTION XIII. FIRE DEPARMENT FIRE MARSHAL FEES (RFA) 15
16SECTION XIV. MONETARY PENALTY SCHEDULE FOR INFRACTIONS ISSUED UNDER
THE AUTHORITY OF CHAPTER 7.80 RCW
City of Renton Fee Schedule
2023‐2024
SECTION I. MISCELLANEOUS FEES1 2023 2024
1. Maps:
a.$4 $4
b. $12 $12
c. $4 $4
d. $12 $12
e. $5 $5
2. Plat:
a. $2 $2
b. $1 $1
3. Photocopies:
a. $0.15 $0.15
b. $0.20 $0.20
c. $0.25 $0.25
4. Budget:
a. $10 $10
b. N/C N/C
5. Audio or Video Recording Copies:
a.$2 $2
b.$2 $2
6. Regulations and Plans:
a.Comprehensive Plan and Map $30 $30
b.Title IV, Development Regulations:
(i)Text and Zoning Map $110 $110
(ii)Text only $100 $100
c.Individual Chapters of Development Regulations $10 $10
d.Renton Municipal Code (two volumes)$400 $400
e.Code Supplements, per year:
(i)Titles I ‐ III and VI ‐ X $70 $70
(ii)Title IV $70 $70
7. Miscellaneous Services:
a.Certification and Notary Fees ‐ Clerk's Certification $10 $10
b.Notary Public Attestation or Acknowledgement or as $10 $10
otherwise provided for in RCW 42.28.090, per signature
c.Hold Harmless Agreements and other similar documents $20 $20
not otherwise provided for
d.Lamination of licenses, pictures $6 $6
e.Community Development Block Grants (CDBG) Loan Program:
(i)Application Fee $200 $200
(ii)Loan Origination Fee $150 or 0.25% of loan amount,
whichever is greater
$150 or 0.25% of loan amount,
whichever is greater
(iii)Closing Costs (including any legal fees)50% of total actual costs 50% of total actual costs
8. Miscellaneous Charges for Police Services:
a.Police Reports per page $0.15 $0.15
b.Record Checks (Written Response)$5 $5
c.Photographs ‐ Digital on CD $2 $2
d.Photographs ‐ black & white or color ‐ Cost of developing film Cost Cost
e.Fingerprint Cards $5 $5
(i)Each additional card $1 $1
9. Charges for Fire Documents:
a.Fire reports per page $0.15 $0.15
b.Fire investigative report on CD $2 $2
c.First copy ‐ black & white or color ‐ Cost of developing film Cost Cost
d.Additional copy ‐ black & white or color ‐ Cost of developing film Cost Cost
10. Computer Listings:
a.City of Renton new business list $10 $10
b.List of all business licenses $20 $20
c.Copies requested to be faxed, local number $3 $3
d.Copies requested to be faxed, long distance number
(i)Multi‐family: 2 units, Duplexes, & Accessory Dwelling Unit (ADU)1 $10 $10
(ii)Six (6) or more pages (ten (10) page limit)$20 $20
11. Utility Fee:
a.Special Request Water Meter Reading $30 $30
b.Utility New Account Setup $25 $25
c.Utility Billing Account Transfer (tenant billing form)$5 $5
d.Water utility outstanding balance search requested by $25 $25
fax, messenger, or letter
e Water turn off and turn on fee $60 $60
f Water utility shutoff list processing fee $60 $60
g Water delinquent late fee of 10% of past due charges but not less than fifty cents 10%10%
h Water after hours service charge to turn on water after 3 p.m. (additional fee)$90 $90
i Tenant notification fee for impending shutoff of water per tenant $5 $5
j Petition filing fee for stormwater appeal from category determination and assessment $75 $75
k Meter Accuracy Reading ‐ For testing 3/4" through 2" meter $40 $40
l Meter Accuracy Reading ‐ For testing meters larger than 2"Time & Materials, requires Time & Materials, requires
a $60 refundable deposit a $60 refundable deposit
prior to test prior to test
12. Schedule of Fines for False Alarms ‐ Security/Burglar: (effective February 1, 2019)
a.$25 $25
b.N/C N/C
c.N/C N/C
d.$100 $100
e.$250 $250
f.$25 $25
g.$50 $50
1 A registration year shall mean January 1 thru December 31 each year.
13. NSF Check Fees $25 $25
14. Veteran Park Tile: Three lines $75 $75
Audio recording, each copy
Video recording, each copy
City's Budget to other municipality or quasi‐municipal corporation or other nonprofit charitable or education organization
City's Budget
Zoning maps ‐ standard 11 x 17
Zoning maps ‐ large 24 x 36
Comprehensive Plan map ‐ standard 11 x 17
Comprehensive Plan map ‐ large 24 x 36
Precinct maps
First page
Each additional page
Each 8.5" x 11" or 8.5" x 14"
Each 11" x 17"
Each 8.5" x 11" or 8.5" x 14" color
First False Alarm in a registration year1
One‐time Registration Fee
Annual Registration Renewal
Second False Alarm in a registration year1
Third or more False Alarm in a registration year1
Late Payment Fee
Unregistered Alarm System Fee
1
City of Renton Fee Schedule
2023‐2024
SECTION I. MISCELLANEOUS FEES1 (CONTINUED)2023 2024
15. Electronic Records1,2,3:
a.Photocopies or printed copies of electronic records, per page $0.15 $0.15
b.Scanning paper records, per page $0.10 $0.10
c.$0.05 $0.05
d.$0.10 $0.10
e.Body worn camera footage redaction, per minute of documented staff time, plus other documented costs of redaction $0.64 $0.64
16. Document Recording Fees:
a.Actual Costs Actual Costs
b.Actual Costs Actual Costs
17. Publication Fees:
Actual Costs Actual Costs
SECTION II. MAPLEWOOD GOLF COURSE 2023 2024
1.
a.Weekday:
(i)18 Hole $43 $43
(ii)9 Hole $32 $32
(iii)18 Hole, Senior $34 $34
(iv) 9 Hole, Senior $26 $26
(v) 18 Hole, Junior $25 $26
(vi) 9 Hole, Junior $19 $20
b.Weekend:
(i) 18 Hole $50 $50
(ii)9 Hole $32 $35
2. Club Rental1:
a.Regular $30 $35
b.Premium $60 $65
3. Golf Cart Fees1:
a.18 Hole $36 $38
b.18 Hole Single Rider $28 $28
c.9 Hole $24 $26
d.9 Hole Single Rider $18 $18
e.Trail Fee $15 $15
f.Half Cart, 18 Hole $18 $19
g.Half Cart, 9 Hole $12 $13
4. Driving Range Fees1:
a.Large Bucket $13 $14
b.Small Bucket $10 $11
c.Warm‐up Bucket $6 $7
5. Lesson Fees:a.1/2 Hour Private $55 $60
b.1 Hour Private $80 $90
c.1/2 Hour Series Private $200 $220
d.1 Hour Series Private $300 $330
e.Group Series $140 $160
f.1/2 Hour Private, Junior $35 $40
g.Playing Lesson(3‐hole minimum/9‐hole maximum) per hole $25 $30
1 Rates include Washington State Sales Tax (WSST)
SECTION III. City CENTER PARKING FEES 2023 2024
1. City Center Parking Garage Fees:
Parking rates for retail parking will be as follows:
a.Zero (0) ‐ two (2) hours N/C N/C
b.Two (2) ‐ four (4) hours $2 $2
c.Four (4) ‐ six (6) hours $4 $4
d.Six (6) ‐ (10) hours $6 $6
e. 10 hours or more $10 $10
f.Monthly pass‐holders, tax included $35 $35
1 The charges identified in RCW 42.56.120(3)(b) (and referenced above) may be combined to the extent that more than one type of charge applies to copies produced in response to a particular request. The actual
cost of any digital storage media or device provided by the agency. Alternatively, the City may charge a flat fee of up to $2 for the entire request as long as the cost of uploading and transmitting the electronic
records is reasonably estimated to equal or exceed that amount. Only one $2 flat fee per request is authorized for electronic records produced in installments. When records are provided electronically on a CD,
DVD, thumb drive, flash drive, or other electronic device, the requestor will be charged for the cost of the electronic storage device. The City may charge an actual‐cost service charge for requests that require use
of IT expertise to prepare data compilations or provide customized electronic access services when not used by the City for other purposes. A cost estimate and explanation will be provided to the requestor before
incurring the costs.2 Option to waive charges. The City may waive charges associated with fulfilling a request. The decision will be based on various factors, including the volume and format of the responsive documents. The
decision to assess fees for fulfilling a public records request shall be made on a consistent and equitable basis, dependent primarily upon the amount of staff time required for copying, scanning, shipping,
uploading, and/or transmitting the records associated with fulfilling a request.3 Certified copies. If the requestor is seeking a certified copy of a City record, an additional charge of $1.00 per each complete document may be applied to cover the additional expense and time required for
certification.
1 Should Section I fees due total less than $4.00 and no other fee is due to the City at the same time, the department administrator may authorize to waive the entire amount due at their discretion.
For purposes of this section, "weekend" shall mean Friday, Saturday, and Sunday. "Weekday" shall mean the remaining four days of the week. "Junior" shall mean ages 17 and under, "Senior" shall mean ages
62 and over.
Off‐season and promotional rates determined by management; posted on website.
The applicant shall pay all Publication fees charged by publication outlet used by the City (The Seattle Times or equivalent). Payment in full shall
be made to the City prior to public hearing, permit approval or issuance, whichever comes first
Miscellaneous charges associated with document recording, such as courier fees
Transmission of records in an electronic format or for the use of agency equipment to send the records electronically, per gigabyte (GB)
Electronic files or attachments uploaded for electronic delivery (email, cloud‐based data storage service, or other means of electronic
delivery), for each four (4) files
The applicant shall pay all document recording fees charged by King county and all administrative fees charged by the title company for
processing. Payment in full shall by submitted to the City before documents are sent for recording
Green Fees1:
2
City of Renton Fee Schedule
2023‐2024
SECTION IV. AQUATIC FEES 2023 2024
1. Admission for the Aquatic Center shall be as follows:
a.Regular Session:
(i)Infants ‐ under 1 year N/C N/C
(ii)Youth ‐ 1 to 4 years $8 $8
(iii)Ages 5 and up $16 $16
(iv)Lap swim ‐ water walking only $5 $7
(v)Locker Rental $0.25 $0.25
b.Canopy Rental Fees1: (includes canopy and admission for one leisure swim session):
(i)Henry Moses Party Tent #1
(10' x 20' for up to twenty‐five (25) guests on wave pool):
(1) Resident Rate, per session $600 $600
(2) Non‐resident Rate, per session $700 $700
(ii)Henry Moses Party Tent #2
(10' x 20' for up to twenty‐five (25) guests):
(1) Resident Rate $500 $500
(2) Non‐Resident Rate $600 $600
(iii)Henry Moses Party Tent #3
(10' x 10' for up to ten (10) guests):
(1) Resident Rate, per session $250 $250
(2) Non‐resident Rate, per session $300 $300
c.Resident Rate all inclusive1 $3,800 $3,800
d.Non‐resident Rate all inclusive1 $4,800 $4,800
e.Swim Lesson Program: Fees and associated descriptions are published in the "Let's Go Renton" Renton Activities Guide
f.End‐of‐year School Party Rentals:
(i)Renton School District
(1) 001 ‐ 299 students $1,900 $1,900
(2) 300 ‐ 399 students $2,250 $2,250
(3) 400 ‐ 499 students $2,400 $2,400
(4) 500 ‐ 599 students $2,550 $2,550
(ii)Other Schools and Districts
(1) 001 ‐ 299 students $2,450 $2,450
(2) 300 ‐ 399 students $2,850 $2,850
(3) 400 ‐ 499 students $3,150 $3,150
(4) 500 ‐ 599 students $3,360 $3,360
1 Sales tax not included in the rental fee
2. Boat Launch Rates:
a.Daily resident ‐ 7 days a week $20 $20
b.Daily Non‐resident ‐ 7 days a week $25 $25
c.Overnight resident ‐ 7 days a week $25 $25
d.Overnight Non‐resident ‐ 7 days a week $45 $45
e.Annual parking boat launch permit ‐ resident $70 $70
f.Annual parking boat launch permit ‐ non‐resident $130 $130
g.
(i) $110 $110
(ii) $115 $115
SECTION V. CARCO THEATER (REPEALED)2023 2024
SECTION VI. PARKS AND FACILITIES USE AND RENTAL 2023 2024
1. Outlying Picnic Shelters (Cedar River Trail, Liberty Park, Phillip Arnold Park, Teasdale Park and Heritage Park) Maximum of 50 people:
a.Resident 10am‐7pm $150 $150
b.Non‐resident 10am‐7pm $290 $290
2. Gene Coulon Beach Park Shelters (South #1, South #2 and Creekside) Maximum of 75 people:
a.Resident 10am‐7pm $150 $150
b.Non‐resident 10am‐7pm $290 $290
e.South Shelters 1 & 2 Resident rate $310 $310
f.South Shelters 1 & 2 Non‐resident rate $610 $610
3. Gene Coulon Beach Park Shelters (North Shelter):
a.Resident 10am‐7pm $200 $200
b.Non‐resident 10am‐7pm $360 $360
4. Basketball court rate per hour (Tournament Play Only):
a.Resident rate $25 $25
b.Non‐resident rate $30 $30
5.
a.Resident rate per hour $25 $25
b.Non‐resident rate per hour $30 $30
c.Temporary Event Permit Fee $85 $85
6. Piazza Park Open Space Event Rental
a.Full day rental 10am ‐ 7pm $500 $500
7. Photo Shoots per hour:
a.Commercial Film and Photo Shoots per hour $300 $300
8. Electrical Spider Box rental:
a. Electrical spider box rental per box, per event, with special event approval $200 $200
Open Space Area in the Parks (Cascade, Teasdale, Phillip Arnold, Cedar River, Earlington, Gene Coulon, Glencoe, Kennydale Lions, Sunset, and
Riverview Parks):
Fishing Tournaments at Coulon Beach (additional rental fee if using the Pavilion area for weigh in and or electricity at the current rental rate) per
event
Resident rate
Non‐resident rate
3
City of Renton Fee Schedule
2023‐2024
SECTION VI. PARKS AND FACILITIES USE AND RENTAL (CONTINUED)2023 2024
9. Athletic Field Rental, Lights and Prep Fees:
a.Sports field rental per hour ‐ resident $30 $30
b.Sports field rental per hour ‐ non‐resident $36 $36
c.Renton Area Youth Sports Agencies, per hour $8 $8
d.Field prep for softball/baseball ‐ resident per occurrence $35 $35
e.Field prep for soccer ‐ resident per occurrence $50 $50
f.Custom Field prep ‐ resident per occurrence $100 $100
g.Field prep for softball/baseball ‐ non‐resident per occurrence $35 $40
h.Field prep for soccer ‐ non‐resident per occurrence $50 $55
i.Custom Field prep ‐ non‐resident per occurrence $100 $100
j.Field lights all sports ‐ resident per hour $30 $30
k.Field lights all sports ‐ non‐resident per hour $36 $36
10. Banquet & Classroom Rental ‐ Community Center & Senior Activity Center:
a.Friday evening 5 hour minimum ‐ resident $750 $750
b.Weekend Rates 10 hour minimum ‐ resident $1,500 $1,500
c.Extra hours ‐ per hour ‐ resident $150 $150
d.Friday 5 hour minimum ‐ non‐resident $900 $900
e.Weekend Rates 10 hour minimum ‐ non‐resident $1,800 $1,800
f.Extra hours ‐ per hour ‐ non‐resident $180 $180
g Banquet Room ‐ Mon ‐ Fri ‐ daytime ‐ resident/hr 3 hour min $100 $100
h Banquet Room ‐ Mon ‐ Fri ‐ daytime ‐ non‐resident/hr 3 hour min $90 $120
i.Damage deposit $550 $550
j Cancellation Fee ‐ Less than 90 days $550 $550
11. Classroom and Gymnasium Rental ‐ Renton Community Center:
a.Resident single gym athletic ‐ per hour $50 $50
b.Non‐resident single gym athletic ‐ per hour $60 $60
c.Resident double gym athletic ‐ per hour $100 $100
d.Non‐resident double gym athletic ‐ per hour $120 $120
e.Resident single gym non‐athletic $1,000 $1,000
f.Non‐resident single gym non‐athletic $1,200 $1,200
g.Resident double gym non‐athletic $2,000 $2,000
h.Non‐resident double gym non‐athletic $2,400 $2,400
i.Carpet fee single gym ‐ resident & non‐resident $325 $325
j.Carpet fee double gym ‐ resident & non‐resident $650 $650
k.Classroom resident $40 $40
l.Classroom Non‐resident $48 $48
12. Facility Rental ‐ Neighborhood Center:
a.Meeting room ‐ resident $35 $40
b.Gymnasium ‐ resident $35 $40
c.Meeting room ‐ non‐resident $40 $48
d.Gymnasium ‐ non‐resident $40 $48
13. Farmer's Market
a.10x10 Lot $40 $40
b.Half Lot $20 $20
c.Application fee $30 $30
d.Electrical fee $5 $5
14. Parklet Rentals
a. Parklet Rental including Installation per Occurrence1 $500 $500
15. Outlying Park Buildings (Tiffany Park Building, Kennydale Park Building, Teasdale Park Building)
a.6‐hour block ‐ resident $200 $200
b.6‐hour block ‐ non‐resident $240 $240
c.Deposit resident & non‐resident $250 $250
d.Non‐profit fee ‐ per hour (no deposit required)$40 $40
SECTION VII. COMMUNITY CENTER PASS CARD & FEES 2023 2024
Fees and associated descriptions are published and available in the "Let's Go Renton" Recreation Guide.
SECTION VIII. AIRPORT CHARGES 2023 2024
1.Airport Fuel Flow Charge: per gallon $0.08 $0.08
2.JetA Fuel Flow Charge: per gallon $0.10 $0.10
3.Transient airplane parking daily $8 $8
4.Hangar wait list, one time fee $100 $100
5.Tie‐down wait list, one time fee $25 $25
6.Lost gate card fee per occurrence $50 $50
7.T‐Hangar, Non‐Refundable Move‐in Fee $250 $250
8.Penalty for violation of Minimum Standards/Airport Rules & Regulations (each occurrence)$500 $500
9.Penalty for Movement Area Incursions (each occurrence), assessed to sponsor/tenant $500 $500
SECTION IX. ANIMAL LICENSES FEES1 ‐ RMC 5‐4‐2 2023 2024
1.Altered Animal Annual License $30 $30
2.Unaltered Animal Annual License $50 $50
3.Economically Qualified Resident Special Lifetime License $0 $0
4.Duplicate Tag $10 $10
1 Long‐Term Right of Way Permit will be required if located within the City Right of Way. See Section XII, Development Fees, of the City of Renton Fee Schedule Brochure: Subsection e of subsection 3, Site Work,
Utilities, and Right of Way Fees
1 Please note, impounded animals are subject to license fees, microchipping costs, and other out‐of‐pocket costs as specified in RMC 6‐6‐2.
4
City of Renton Fee Schedule
2023‐2024
SECTION X. BUSINESS LICENSES 2023 2024
1. General Business License:
a.Registration Fee $150 $150
b.Appeal of Business License Decision $250 $250
2. Penalties:
a.The penalty to reinstate an expired business license $50 $50
b.The penalty for failure to obtain a business license $250 $250
c.
SECTION XI. ADULT ENTERTAINMENT LICENSES 2023 2024
1. Every person applying for a adult entertainment license shall pay the applicable nonrefundable application fee:
a.Adult Entertainment Business License $750 $750
b.Entertainer $75 $75
c.Manager $75 $75
d.License Replacement $10 $10
2. Penalties:
a.Civil Penalty, per violation $1,000 $1,000
5%‐15%5%‐15%
Failure to pay the license fee within one day after the day on which it is due and payable pursuant to subsection C7 of Chapter 5 of the RMC
shall render the business enterprise subject to a penalty of (5%) of the amount of the license fee for the first month of the delinquency and
an additional penalty of (5%) for each succeeding month of delinquency, but not exceeding a total penalty of (15%) of the amount of such
license fee.
5
City of Renton Fee Schedule
2023‐2024
SECTION XII. DEVELOPMENT FEES 2023 2024
1.
a.
(i)$42 $42
b.
(i)$317 $317
(ii)$348 $348
(iii)$254 $254
(iv)$285 $285
(v)$285 $285
(vi)$348 $348
c.
(i)65% of permit fee 65% of permit fee
(ii)50% of initial plan Check Fee 50% of initial plan Check
d.
(i)$25 $25
(ii)
(1)$6.50 $6.50
(2)$2 $2
e.
(i)
(1)
(a)$269 $269
(b)$285 $285
(2)
(a)$209 $209
(b)$221 $221
(c)$26 $26
(d)$209 $209
(e)$93 $93
(ii)
(1)$82 $82
(2)$82 + 4.89% of value $82 + 4.89% of value
(3)$106.45 + 4.93% of value $106.45 + 4.93% of value
Mult $303.78 + 2.58% of value $303.78 + 2.58% of value
(5)$1,463.10 + 1.70% of value $1,463.10 + 1.70% of value
(6)$4,870.92 + 1.45% of value $4,870.92 + 1.45% of value
(7)$15,775.97 + 0.53% of value $15,775.97 + 0.53% of value
(iii)$209 $209
(iv)
(1)$209 $209
(2)$209 $209
(3)$209 $209
(5)
(a)$135 $135
(b)$209 $209
f.$190 $190
$190 on 1st unit / $24 each
add'l unit
$190 on 1st unit / $24 each
add'l unit
Inspection Fee For Condominium Conversionsg.
50% of commercial fees
Minimum $209
50% of commercial fees
Minimum $209
2 Building Plan Check Fee is in addition to the building permit fees, demolition permit fees, and combination building permit fees. The plan check fee is equal to 65% of the building permit
fee, or the demolition permit fee, or the combination building permit fee. Includes three (3) review cycles.
1 This fee shall be $0 for Accessory Dwelling Units (ADU).
1 This fee shall be $0 for Accessory Dwelling Units (ADU).2 Combination Building Permit fees are required for each new single family residential structure.
$42 + $4.70 x each
$100 value
$42 + $4.70 x each
$100 value
$112.57 + $21.63 x each
$1,000 value
$112.57 + $21.63 x each
$1,000 value
$610.06 + $15.57 x each
$1,000 value
$610.06 + $15.57 x each
$1,000 value
$999.31 + $10.85 x each
$1,000 value
$999.31 + $10.85 x each
$1,000 value
$1,541.81 + $8.63 x each
$1,000 value
$1,541.81 + $8.63 x each
$1,000 value
$4,993.81 + $7.33 x each
$1,000 value
$4,993.81 + $7.33 x each
$1,000 value
$8,659.81 + $5.66 x each
$1,000 value
$8,659.81 + $5.66 x each
$1,000 value
New Service ‐ Single Family and Duplex1
Service Changes/New Circuits ‐ Single Family and Duplex:
Change up to 200 AMP
Change over 200 AMP
Any new circuits added to above price is per each up to a maximum of $80.00
Minimum fee for remodel/addition of new circuits without a service charge
Initial Building Plan Check Fee2
Additional Building Plan Check Fee
Plumbing up to 3,000 sq ft
Plumbing over 3,000 sq ft
Mechanical up to 3,000 sq ft
Mechanical over 3,000 sq ft
Electrical up to 3,000 sq ft
Electrical over 3,000 sq ft
Cooling system circuit for new or replaced appliance
Up to 200 AMP
Over 200 AMP
2 Exemption: Residential telephone communication systems, thermostats, security systems, and cable television installations are exempt from fees
1 This fee shall be $0 for Accessory Dwelling Units (ADU).
1 This covers only the Building Section inspection of the structure prior to move. There is a separate additional fee charged by the Public Works Department to cover the actual house
move permit. A building permit is also required in order to site the structure on the new site.
Base Residential Fee
Each additional unit after first unit
Residential projects:
Residential Photovoltaic (PV) Solar Panel
Permit fee
1 This fee shall be $0 for Accessory Dwelling Units (ADU).
$500.01 to $1,000.00
$1,000.01 to 5,000.00
$5,000.01 to $50,000.00
$50,000.01 to $250,000.00
$250,000.01 to $1,000,000.00
House Moving1 ‐ minimum per hour Inspection Fee:
$1,000,000.01 and up
Building Plan Check Fee1
Building and Demolition Permit Fees:1
Building Fees:
(viii)
(vii)
(vi)
(ii)
(iii)
(iv)
(v)
Base Fee/Valuation $1.00 to $500.00
Valuation $501.00 to $2,000.00
Valuation $2001.00 to 25,000.00
Valuation $25,001.00 to $50,000.00
Valuation $50,001.00 to $100,000.00
Valuation $100,001.00 to $500,000.00
Valuation $500,001.00 to $1,000,000.00
Valuation $1,000,001.00 and up
Combination Building Permit Fees1,2
Review Fee
Temporary Electrical Services
Miscellaneous Electrical Fees
Multi‐Family, Commercial and Industrial Fees: Fees based on value of work.
Residential Fees ‐ Single ‐Family and Duplex
State Building Code Fee:
Electrical Permit Fees2:
Non‐residential projects
$1.00 to $500.00
Signs per each
Mobile Homes
Low Voltage Work (e.g., alarm systems; thermostats; computer, data, or phone lines; fiber optics, cable
television, etc.)
(4)
Job Trailers
6
City of Renton Fee Schedule
2023‐2024
SECTION XII. DEVELOPMENT FEES (CONTINUED)2023 2024
1.
h.
(i)$190 $190
(ii)Building Permit Fees Building Permit Fees
i.
(i)$65 $65
(1)$26 $26
(2) Boiler or Compressor $26 $26
(3)$26 $26
(4) Ventilation/exhaust fan $26 $26
(5) Fuel Gas Piping (each gas piping system up to 6 outlets)$26 $26
(ii)$96 $96
(1)$45 $45
(2) Boiler or Compressor $96 $96
(3) Refrigeration System $96 $96
(4)$96 $96
(5) Incinerator: Installation or relocation of each $127 $127
(6)$45 $45
(7) Fuel Gas Piping (each gas piping system up to 6 outlets)$45 $45
j.
(i) Residential ‐ Plumbing Permit base fee plus itemized fees below $65 $65
(1)$12 $12
(2) Water Service: For meter to house $12 $12
(3) Per fixture for repair or alteration of drainage or vent piping $12 $12
(4) Per drain for rainwater systems $12 $12
(5) Per lawn sprinkler system, includes backflow prevention $12 $12
(6) Per vacuum breaker or backflow protection device on tanks, vats, etc.$12 $12
(7) Per interceptor for industrial waste pretreatment $12 $12
(8) Fuel Gas Piping: (each gas piping system up to 6 outlets)$26 $26
(ii) Commercial or Multi‐Family: Plumbing Permit base fee plus itemized fees below $96 $96
(1)$19 $19
(2)$19 $19
(3)$19 $19
(4)$19 $19
(5)$19 $19
(6)$19 $19
(7)$19 $19
(8)$33 $33
(9)$96 $96
k.
(i)
(1)$317 $317
(2)$317 $317
(ii)
(1)$96 $96
(2)$96 $96
(3)$63 $63
(4)$158 $158
(5)$96 $96
(6)$96 $96
l.
(i)
(1)$158 $158
(2)$158 $158
(3)$158 $158
(4)$175/hr $175/hr
(ii)
(1)40% 40%
(2)50% 50%
(3)$158/hr $158/hr
(4)5% of Permit Fee 5% of Permit Fee
(5)5% of Permit Fee 5% of Permit Fee
(iii)2 X Permit Fee 2 X Permit Fee
Reinspection Fee; Misc building inspection
Electrical, Plumbing, or Mechanical Permits (percentage of permit fee)
Additional Plan Review Fees: Over three review cycles (percentage of plan review fee)
Miscellaneous Plan Review: hourly fee.
Real Estate Directional Signs, pursuant to RMC 4‐4‐100J2, permit valid for a 12‐months period
Grand Opening Event Signs, pursuant to RMC 4‐4‐100J6d(i)
Per plumbing fixture (e.g., sink, shower, toilet, dishwasher, tub, etc.) or set of fixtures on one trap
Work commencing before permit Issuance: Where work for which the permit is required is started prior to obtaining
the permit, a special investigation fee in an amount equal to twice the permit fee shall be charged. The special
investigation fee shall be paid in addition to the required permit fees
Permanent Signs:
Inspection Fees:
Plan Review Fees:
Event Signs, pursuant to RMC 4‐4‐100J6d(ii) and (iii) per sign, per promotion
A‐Frame Signs, pursuant to RMC 4‐4‐100J5 Charge is for the first sign, all subsequent signs are $50.00
Commercial Property Real Estate Banner each sign permit is valid for 12 months.
After hours inspection2
Building Fees: (Continued)
1 This fee shall be $0 for Accessory Dwelling Units (ADU).
1 This fee shall be $0 for Accessory Dwelling Units (ADU).
1 Includes plan review and inspection fees for the foundation (electrical, plumbing, mechanical, sewer and water connection fees are in addition to the below amounts).
WABO ‐ Adult Family Home; Misc building inspection
Commercial Hood: Installation of each served by a mechanical exhaust, including the ducts for such hood each
Heating system (furnace, heat pump, suspended heater, fireplace, wood stove, etc.). A/C system (air
conditioner, chiller or Air Handling Unit (VAV) including ducts and vents
Site Plan/Zoning Review1
Engineering Review1
Fuel Gas Piping: (each gas piping system up to 6 outlets)
Medical Gas Piping: (each gas piping system up to 6 outlets)
Sign Permit Fees:
Plumbing Permit Fees:1
Per fixture for repair or alteration of drainage or vent piping
Per drain for rainwater systems
Per lawn sprinkler system, includes backflow prevention
Per vacuum breaker or backflow protection device on tanks, vats, etc.
Per interceptor for industrial waste pretreatment
Miscellaneous Fees:
Minimum Housing Inspection
Decorative Flags fee is per entrance and valid until flag(s) are removed
Roof, projecting, awning, canopy, marquee, and wall signs
Freestanding ground and pole signs
Temporary and Portable Signs:
Per plumbing fixture (e.g., sink, shower, toilet, dishwasher, tub, etc.) or set of fixtures on one trap
Water Service: For meter to building
Mechanical Permit Fees:1
Residential ‐ Mechanical Permit base fee plus itemized fees below:
Commercial or Multi‐Family ‐ Mechanical Permit base fee plus itemized fees below:
Within a manufactured home park
Manufactured/Mobile Home Installation Fees1:
Appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for
which no other fee is listed in this code
Appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for
which no other fee is listed in this code
Outside of a manufactured home park
Heating system (furnace, heat pump, suspended heater, fireplace, wood stove, etc.). A/C system (air
conditioner, chiller or Air Handling Unit (VAV) including ducts and vents
1 This fee shall be $0 for Accessory Dwelling Units (ADU).2 Applies to inspection performed on Saturdays, Sundays, observed City of Renton holidays, and non‐holiday Monday‐Fridays
outside the hours of 7:00AM to 3:30PM
7
City of Renton Fee Schedule
2023‐2024
SECTION XII. DEVELOPMENT FEES (CONTINUED)2023 2024
2.
(i)$56 $56
(ii)$120 $120
(iii)
(1)$5,900 $5,900
(2)$5,900 $5,900
(iv)
(1)$560 $560
(2)$560 $560
(3)$560 $560
(v)$5,930 $5,930
(vi)
(vii)$5,900 $5,900
(viii)
(1)$3,710 $3,710
(2)$1,800 $1,800
(3)50% of Application Fee 50% of Application Fee
(4)Application Fee Application Fee
(ix)N/C N/C
(x)$1,410 $1,410
(xii)$11,240 $11,240
(xiii)100% of cost 100% of cost
(xiv)$1,800 $1,800
(xv)$1,800 $1,800
(xvi)$180 $180
(xvii)$6,080 $6,080
(xviii)$180 $180
(xix)N/C N/C
(xx)$570 $570
(xxi)$1,230 $1,230
(xxii)
(1)$1,230 $1,230
(2)$3,650 $3,650
(3)$1,800 $1,800
(xxiii)$170 $170
(xxiv)
(1)$6,080 $6,080
(2)$3,040 $3,040
(3)$12,170 $12,170
(4)$6,080 $6,080
(5)50% of Application Fee 50% of Application Fee
(6)Application Fee Application Fee
(xxv)
(1)$6,080 $6,080
(2)$3,030 $3,030
(xxvi)
(1)$570 $570
(2)$1,730 $1,730
(xxvii)N/C N/C
(xxviii)$5,900 $5,900
(xxix)$120 $120
(xxx)
(1)N/C N/C
(2)$3,030 $3,030
Mult $3,650 $3,650
(4)$3,650 $3,650
(xxxi)
(1)$4,270 $4,270
(2)$3,030 $3,030
(3)50% of Application Fee 50% of Application Fee
(4)Application Fees Application Fees
(xxxii)$570 $570
(xxxiii)$3,030 $3,030
(xxxiv)
(1)$280 $280
(2)$280 $280
(xxxv)
(1)$120 $120
(2)$230 $230
(xxxvi)$1,490 $1,490
(xxxvii)$290 $290
(xxxviii)$540 $540
10 acres or more
Land Use Review Fees:
HEX
Revision (minor, administrative)
Revision (major)
Critical Areas Exemption
Critical Areas Permit
(xi) Critical Areas Review Fee: for those projects that propose impacts to critical areas and will be billed at the cost of
contract biologist’s review.2
Lot Line Adjustment
Environmental (SEPA) Addendum
Fence Permit (special)
Grading and Filling Permit (Hearing Examiner)
100% of contract cost 100% of contract cost
General Land Use Review1:
Additional Animals Permit
Address Change
Annexation:
Less than 10 acres
Administrative
Appeal of:
Hearing Examiner's Decision
Administrative Decision
Environmental Decision
Binding Site Plan (total fee for both preliminary and final phases)
Code Text Amendment
Comprehensive Plan Map or Text Amendment (each)
Conditional Use Permit:
Development Agreement
Environmental Impact Statement Cost include the coordination, review and appeal. Draft and Final3
Environmental Checklist Review
Landscape Review Fee
Legal Lot Segregation
Lot Consolidation
Major Plat Amendment
Manufactured/Mobile Home Park:
Tentative
Preliminary
Final
Open Space Classification Request
Plats:
Preliminary Short Plat
Final Short Plat
Preliminary Plat
Final Plat
Minor Plat Amendment
Substantial Development Permit
Planned Urban Development:
Preliminary Plan
Final Plan
Reasonable Use Exception:
In conjunction with land use permit
Stand alone
Public Arts Exemption
Rezone
Routine Vegetation Management Permit without Critical Areas
Shoreline‐Related Permits:
Shoreline Permit Exemption
Application
Conditional Use Permit
Variance
Hearing Examiner Review
Administrative Review
Site Development Plan (Site Plan or Master Plan which includes design review fee for projects subject to RMC 4‐3‐100):
Modification (minor, administrative)
Modification (major) required new application and repayment of fee required
Small Cell Permit, per site4
Special Permit (Hearing Examiner)
Street Naming (Honorary)
Waiver or Modification of Code Requirements cost is per request
Zoning Compliance Letter
Installation
Temporary Use Permits:
Tier 1
Tier 2
Variance (per each variance requested) Administrative or Hearing Examiner
8
City of Renton Fee Schedule
2023‐2024
SECTION XII. DEVELOPMENT FEES (CONTINUED)2023 2024
2.
a.
b.
(i)
SECTION XII. DEVELOPMENT FEES (CONTINUED ON THE NEXT PAGE)
1 Exception for Projects Vested in the County: For those projects that have vested to a land use permit under the development regulations of King County, the King County Land Use Review
Fee Schedule shall apply, and is hereby adopted by reference. A copy of that fee schedule has been filed with the City Clerk and is available at the City Clerk’s office for public review.
1 Exception for Projects Vested in the County: For those projects that have vested to a land use permit under the development regulations of King County, the King County Land Use Review
Fee Schedule shall apply, and is hereby adopted by reference. A copy of that fee schedule has been filed with the City Clerk and is available at the City Clerk’s office for public review.2 Per RMC 4‐3‐050F7, the City may charge and collect fees from any applicant to cover costs incurred by the City in review of plans, studies, monitoring reports and other documents related to
evaluation of impacts to or hazards from critical areas and subsequent code‐required monitoring.3 When the City is the lead agency for a proposal requiring an Environmental Impact Statement (EIS) and the Environmental Review Committee (ERC) determines that the EIS shall be
prepared, the City may charge and collect a reasonable fee from any applicant to cover costs incurred by the City in preparing the EIS. The ERC shall advise the applicant(s) of the projected
costs for the EIS prior to actual preparation; the applicant shall post bond or otherwise ensure payment of such costs. The ERC may determine that the City will contract directly with a
consultant for preparation of an EIS, or a portion of the EIS, and may bill such costs and expenses directly to the applicant. Such consultants shall be selected by mutual agreement of the City
and applicant after a call for proposals. If a proposal is modified so that an EIS is no longer required, the ERC shall refund any fees collected under this subsection which remain after incurred
costs are paid. The City may collect a reasonable fee from an applicant to cover the cost of meeting the public notice requirements of this Title relating to the applicant’s proposal. The City
shall not collect a fee for performing its duties as a consulted agency. The City may charge any person for copies of any document prepared under this Title, and for mailing the document, in a
manner provided by chapter 42.17 RCW.4 Prior to issuance of a small cell permit, the applicant shall pay the actual administrative expenses incurred by the City that are directly related to the City's review of the application,
including plan inspection, and approval, as authorized by RCW 35.21.860(1)(b), as may be amended.
Permit review staff overtime (applies only if permit review is requested by the applicant to be performed on
Saturdays, Sundays, observed City of Renton holidays, and non‐holiday Monday‐Fridays outside of the hours of city
staff regular work schedule)
$175/hr $175/hr
Land Use Review Fees: (Continued)
Miscellaneous Fees1:
General Land Use Review1: (Continued)
9
City of Renton Fee Schedule
2023‐2024
2023 2024
3.
a.
(i)
Grade and Fill Quantity Cleared or Disturbed Area
< 50 cy < 7,000 sf
50 cy ‐ 499 cy 7,000 sf ‐ < 3/4 acre
500 cy ‐ 4,999 cy 3/4 ac ‐ < 1 ac
5,000 cy ‐ 49,999 cy 1 ac ‐ < 2.5 ac
50,000 cy ‐ 99,999 cy 2.5 ac ‐ < 5 ac
100,000 cy and larger 5 ac and larger
(1)
(a)N/A N/A
(b)$520 $520
(c)$700 $700
(d)$1,050 $1,050
(f)$1,400 $1,400
(e)$1,750 $1,750
(2)
(a)N/A N/A
(b)$500 $500
(c)$1,000 $1,000
(d)$1,330 $1,330
(f)$2,660 $2,660
(e)$3,990 $3,990
(3)1.5 x Review/Intake Fee 1.5 x Review/Intake Fee
(4)1.5 x Review/Intake Fee 1.5 x Review/Intake Fee
(ii)
(1)6% of cost 6% of cost
(2)$9,000 + 5% over $150,000 $9,000 + 5% over $150,000
(3)$17,500 + 4% over $350,000 $17,500 + 4% over $350,000
(iii)0.5% of cost 0.5% of cost
(iv)
$280 $280
(2)$1,700 $1,700
(v)$3,000 $3,000
b.
(i)
(1)$1,120 $1,120
(2)$2,250 $2,250
(3)$4,500 $4,500
(ii)
(1)15% of total 15% of total
(2)10% of total 10% of total
(3)5% of total 5% of total
(iii)$840 $840
c.
(i)
(1)
(a)$4,850 $4,850
(b)$648 $648
(c)$3,650 $3,650
(2)
(a)$24,250 $24,250
(b)$3,238 $3,238
(c)$18,250 $18,250
(3)
(a)$38,800 $38,800
(b)$5,181 $5,181
(c)$29,200 $29,200
Solid Waste Fills Review Fee1:
Inspection/Issuance Fee:
Review/Intake Fee:
Tier 0 (no permit required)
Tier 1
Tier 2
Tier 3
Tier 4
Tier 5
Tier 0 (no permit required)
Tier 1
Tier 2
Tier 3
Tier 4
Tier 5
Plan Revision following Permit Issuance:
(1)Minor (Results in a change 10% or less than the cost of improvements7. Excludes minor adjustments that are
approved by the City to be shown on record drawings.)
Major (Results in a change of greater than 10% of the cost of improvements7.)
6 The fee shall be based up percentage of the estimated cost of improvements.
1 The fee for a grading license authorizing additional work to that under a valid license shall be the difference between the fee paid for the original license and the fee shown for the entire project.
2 Any unused fee may be carried forward to the next year. If any work is done before the license is issued, the grading license fee shall be doubled.
Segregation processing fee, if applicable
Over $50,000 but less than $200,000
4 Includes three (3) review cycles. Additional reviews will be charged $1,700 each.
5/8 x 3/4 inch and 1 inch:
Water and Wastewater System Development Charges (SDC):
Utility System Development Charges (SDC):
2 The administration and collection fee is deducted from each individual latecomer fee payment and the balance forwarded to the holder of the latecomer’s agreement pursuant to RMC 9‐5, Tender of Fee.
Latecomers' Agreement Application Fees1:
Processing fee2 (Nonrefundable)
$50,000 or less
Over $50,000 but less than $200,000
$200,000 and over
Fire sprinkler service fee 2,3
Wastewater fee4
Fire sprinkler service fee 2,3
Civil construction plan review and inspection fees6,7,8:
8 Fifty Percent (50%) of the fee is due at Civil Construction Permit Application and the remaining shall be due prior to permit issuance.
Wet weather (annual fee)
5 If deemed necessary by the City in its sole discretion, the City will contract with one or more consultants to provide plan reviews and/or inspections with the related costs and expenses payable by the applicant.
3 All developers, municipal or quasi‐municipal entities, or utility corporations or companies, except those specifically exempted, shall pay fees under this Section. Exempted entities include City‐franchised cable TV, cable
modem, natural gas, telecommunications, and electrical power.
7 Cost of improvements shall be based on the City's bond quantity worksheet and shall include all project related improvements outside of the building envelopes, including, but not limited to, all costs required to construct the
following: paved parking lots, private sidewalks or walkways; private and public storm water management facilities; temporary erosion and sedimentation control facilities; water quality facilities; public and private streets;
public and private sanitary sewers; public water main improvements; required off‐site street, bike and pedestrian improvements; street lighting improvements; required landscaping and street tree improvements; and site
grading and mobilization costs. The applicant may elect to submit a separate, itemized cost estimates for each item of improvement subject to the approval by the City.
1‐1/2 inch:
Multi‐family: 2 units, Duplexes, & Accessory Dwelling Unit (ADU)1
$50,000 or less
Wastewater fee4
2 inch:
Water service fee4
Water service fee4
SECTION XII. DEVELOPMENT FEES (CONTINUED)
New or Replaced Hard Surface
< 2,000 sf
2,000 sf ‐ 4,999 sf
5,000 sf ‐ < 1 ac
1 ac ‐ < 2.5 ac
2.5 ac ‐ < 5 ac
5 ac and larger
Site Work, Utilities, and Right of Way Fees:
Site Work and Civil Construction Fees:
Tier
0
1
2
3
4
5
Clearing, Grading, Excavation, and Mining Permits and License Fees: Fees shall be based on the highest tier
Annual Licenses of Solid Waste Fills Review Fee1,2:
$150,000.00 or less
Over $150,000.00 but less than $350,000.00
$350,000.00 and over
Site Plan/Zoning Review and Inspection Fee6,7
1 Fees are based on the amount covered by the Latecomers'.
Water service fee1,4
Fire sprinkler service fee 2,3
Wastewater fee1,4
$200,000 and over
10
City of Renton Fee Schedule
2023‐2024
2023 2024
3.
c.
(4)
(a)$77,600 $77,600
(b)$10,362 $10,362
(c)$58,400 $58,400
(5)
(a)$121,250 $121,250
(b)$16,191 $16,191
(c)$91,250 $91,250
(6)
(a)$242,500 $242,500
(b)$32,383 $32,383
(c)$182,500 $182,500
(7)
(a)$388,000 $388,000
(b)$51,812 $51,812
(c)$292,000 $292,000
(ii)
(1)$2,300 $2,300
(3)$0.920 per sq foot $0.920 per sq foot
(iii)$840 + administrative costs $840 + administrative costs
(iv)
d.
(i)
(1)
(a)$50 $50
(c)Time and materials Time and materials
(d)$275 $275
(e)$95 $95
(f)$250 $250
(g)$560 $560
(h)$1,025 $1,025
(i)$80 $80
(k)$185 $185
(n)Time and materials Time and materials
(o)$50 $50
(p)$200 $200
(2)
(a)
(i)$2,875 $2,875
(ii)$400 $400
(b)
(i)$2,935 $2,935
(ii)$400 $400
(c)
(i)$2,875 $2,875
(ii)$460 $460
(d)
(i)$4,605 $4,605
(ii)$750 $750
SECTION XII. DEVELOPMENT FEES (CONTINUED)
Site Work, Utilities, and Right of Way Fees: (Continued)
3/4” meter installed by City within City limits.2
3/4” meter installed by City outside City limits2
Installation of stub service and meter setter only.
1” meter installed by the City.2
Installation of stub service and meter setter only.
1‐1/2" meter installed by the City.
2 Based upon the size of the fire sprinkler service (NOT detector bypass meter)
Temporary Utility Connection6:
(2)
$2,000 deposit +
time and materials
Water main cut and cap
Installation of stub service and meter setter only.
$250 + $0.15 per lineal foot
Water meter installation fees – City installed:
Installation fees for ring and cover castings
1 This fee shall be reduced by fifty percent (50%) for Accessory Dwelling Units (ADU).
4 Any parcel that currently has water and or sewer service is eligible for a prorated system development charge is eligible for credit of the existing connection. Fee(s) based upon meter(s) proposed for final project will be
reduced by the fee(s) based upon meter existing on site.
3 Unless a separate fire sprinkler service is provided, the system development charge(s) shall be based upon the size of the meter installed and a separate Fire sprinkler service fee will not be charged.
(l)
(m)
Water quality/inspection/purity tests
Water turn ons/offs after hours
New water line chlorination fee. Fee plus $0.15 per lineal foot for any footage after the first two hundred
fifty (250) lineal feet
3 inch:
Water service fee4
All other uses charge per square foot of new impervious surface, but not less than $2,300
Fire sprinkler service fee 2,3
Wastewater fee4
Water service fee4
Fire sprinkler service fee 2,3
Wastewater fee4
Water service fee4
Utility System Development Charges (SDC): (Continued)
30% of SDC
30% of SDC 30% of SDC
Fire sprinkler service fee 2,3
Wastewater fee4
8 inch:
$0.920 per sq footAddition to existing single family residence greater than 500 square feet (including mobile/manufactured
homes) Fee not to exceed $2,300
Wastewater Fee; Annual fee equal to thirty percent (30%) of the current SDC applicable to the size of the
temporary domestic water meter(s).
Utility SDC Segregation Request5
Meter resets
Repair of damage to service
Water meter tests for 3/4” to 2" meter
Water Testing, Construction, and Administration Fees:
Drop in meter only
Drop in meter only
Drop in meter only
Drop in meter only
Water Fee; Annual fee equal to thirty percent (30%) of the current SDC applicable to the size of the temporary
water meter(s).
(2)
(3)
(1)
Utility Construction Permit Fees:
5 The applicant shall pay the City’s administrative costs for the preparation, processing and recording of the partial payment of the fee(s). If the same segregation is used for more than one utility’s special assessment district,
and/or latecomer’s charge, then only one administrative fee is collected.
30% of SDC 30% of SDC
30% of SDC
Fire sprinkler service fee 2,3
Wastewater fee4
4 inch:
Storm Water System Development Charges (SDC):
New single family residence (including mobile/manufactured homes) & Accessory Dwelling Unit (ADU)1
Storm Water Fee; Fee equal to thirty percent (30%) of the current SDC applicable to that portion of the
property.
Water service fee4
6 inch:
$0.920 per sq foot
6 Temporary connection may be granted for a one‐time, temporary, short‐term use of a portion of the property for a period not to exceed three (3) consecutive years. Fee shall be paid annually (non‐prorated), and shall be
nonrefundable, nontransferable (from one portion of the property to another) and shall not constitute a credit to the system development charge due at the time of permanent use of the utility system. The application for
temporary connection shall consist of a detailed plan and a boundary line of the proposed development service area for use in the fee determination.
(b)
(j)
$250 + $0.15 per lineal foot
Cost of test +
$70 processing fee
Cost of test +
$70 processing fee
$60 deposit +
time and materials
$60 deposit +
time and materials
Water meter tests on meters 2" or larger
Specialty water tests (lead, copper, etc)
Water main connections
$2,000 deposit +
time and materials
Installation of isolation valve.
Open and close fire hydrants for fire flow tests conducted by others.
Water service disconnection (cut at main)
Water Construction Permit Fees:
Miscellaneous water installation fees.
Service size reductions
Installation of stub service and meter setter only.
11
City of Renton Fee Schedule
2023‐2024
2023 2024
3.
d.
(e)
(i)$4,735 $4,735
(ii)$950 $950
(4)
(a)$50 $50
(b)
(i)$500 $500
(ii)$2,000 $2,000
(iii)$25 $25
(c)
(i)$50 $50
(ii)$250 $250
(ii)
(1)
(a)$375 $375
(b)$375 $375
(2)
(a)$375 $375
(b)$375 $375
(3)
(a)$375 $375
(b)$375 $375
(4)
(a)$375 $375
(b)$375 $375
(5)
(a)$375 $375
(b)$375 $375
(6)$375 $375
$375 $375
(iv)$525 $525
(v)
(1)$500 $500
(2)$1,000 $1,000
e.
(i)
(1)$5,620 $5,620
(2)
(a)$670 $670
(b)$670 + Time and Materials $670 + Time and Materials
(c)$670 $670
(3)
(a)Time and Materials Time and Materials
(b)$135 $135
(c)$850 deposit + Time and Materials $850 deposit + Time and Materials
(i)
(1)$715.38 $715.38
(2)$1,430.76 $1,430.76
(3)$2,146.14 $2,146.14
(4)$2,861.51 $2,861.51
(5)$3,576.89 $3,576.89
(ii)Actual cost Actual cost
(e)$270 $270
(f)Actual cost Actual cost
(4)
(a)$10.00 $10.00
(b)$20.00 $20.00
(c)$30.00 $30.00
(ii)
(1)$370 $370
(2)$700 $700
(3)$375 $375
Tier 3, conduit within signalized intersection crossings, bridges and train tracks
All other work, permit fee plus staff time per hour6
Other public agencies constructing utilities within City right‐of‐way
Small Cell Master Lease Agreement including Site License Addendum and Small Cell Permits
Master Lease Agreement Administrative Costs, Staff time per hour and/or cost of materials.6
Pole Reservation, per pole
Administrative Fee, Base plus time and/or cost of materials.6
plus King County sewer rate on discharged amount plus King County sewer rate on discharged
amount
Franchise Permit Fees: 4,5
Surface water permit fee
Commercial:
Wastewater permit fee
Surface water permit fee
Industrial:
Wastewater permit fee
Standard locate
Franchise Permit Fees:
Electrical service (annual fee)
Single family residence, one unit only
All other uses, excluding those listed
Wastewater or storm water service
All other reimbursement
Tier 2, conduit outside of planter strips excluding signalized intersection crossings, bridges and train tracks
Short‐Term ROW Permit Fees (duration 30 days or less)2,7:
Public Reimbursement (any costs incurred by the City on behalf of the permit applicant for installation or
operation of site equipment)
All other fees6
Tier 1, Daily peak kWh <20
Tier 2, Daily peak kWh 21 ‐ 40
Tier 3, Daily peak kWh 41 ‐ 60
Tier 4, Daily peak kWh 61 ‐ 80
Tier 5, Daily peak kWh >81
(d)
Site License Addendum Rent
Conduit Lease Rates per Lineal Foot (annual fee):
Tier 1, conduit in existing planter strips
Right of Way (ROW) Use Permits Fees1
Small work, including trenching less than 60 linear feet or installation of 6 or less utility poles
1 This fee shall be $0 for Accessory Dwelling Units (ADU).
Master Service Agreement Application Fee3
(7)
2 This fee shall be reduced by fifty percent (50%) for Accessory Dwelling Units (ADU).
Cut and Cap/Demolition Permit:
Wastewater permit fee
Surface water permit fee
Reinspection for Wastewater or Surface Water Permits
SECTION XII. DEVELOPMENT FEES (CONTINUED)
Site Work, Utilities, and Right of Way Fees: (Continued)
Utility Construction Permit Fees: (Continued)
Large project locate
Surface water permit fee
3/4” meter and backflow prevention assembly.
3” meter and backflow prevention assembly.
Deposit processing charge, nonrefundable.
Meter rental (begins on day of pickup):
3/4” meter and backflow prevention assembly. Per month.
3” meter and backflow prevention assembly. Per month.
Wastewater and Surface Water Construction Permit Fees1:
Residential:
Wastewater permit fee
Wastewater permit fee
$220 (3) Water meter processing fees – Applicant installed: For meters larger than 2”, the applicant must provide
materials and install the meter.
$220
Installation of stub service and meter setter only.
2” meter installed by the City.
Street light system fee, per new connection to power system
Utility Locate Refresh Fee (Fee is due each time excavator calls in for locate refresh during 45‐day locate ticket)
Ground water discharge (temporary connection to wastewater system for discharge of contaminated ground
water over 50,000 gallons) Rate plus billed for current Renton and King County sewer rate on discharged
amount (meter provided by property owner)
Drop in meter only
Hydrant Meter fees:
Hydrant meter permit fee
Deposits:
Surface water permit fee
Repair or modification of any of the above
12
City of Renton Fee Schedule
2023‐2024
2023 2024
3.
e.
(iii)
(1)
(b)
(i)$1,025 $1,025
(ii)$1,025 $1,025
(2)
(i)
(iv)$10 $10
f.
(i)$280 $280
(ii)$280 $280
g.
(i)$560 $560
(ii)
(1)$840 $840
(2)$1,410 $1,410
(3)$2,250 $2,250
h.
(i)
(1)
(a)$130/LF $130/LF
(b)$150/LF $150/LF
(ii)$158 $158
(iii)$158 $158
(iv)$158/hr $158/hr
(v)$175/hr $175/hr
(vi)$175/hr $175/hr
(vii)Actual cost Actual cost
(viii)$670 $670
Inspection for Unscheduled Work2
After hours inspection4
1 This fee shall be $0 for Accessory Dwelling Units (ADU).
Oversize Load Permits
(iii)All other uses; fee is a per year charge of assessed value of land adjoining the property12, plus
leasehold excise tax9, if applicable. In no case less than $50.00.
0.5% x Value12 + LET9 0.5% x Value12 + LET9
Processing and completion fee, payable upon Council approval of the vacation and upon administrative
determination of appraised value of vacated right‐of‐way. Appraised Value of Vacated right‐of‐way:
Street and Alley vacation Fees: The imposition, collection, payment and other specifics concerning this charge are detailed in
chapter 9‐14 RMC, Vacations.
Release of easement fees: The imposition, collection, payment and other specifics concerning this charge are detailed in
chapter 9‐1 RMC, Easements.
Filing fee
Processing fee
Filing fee
Less than $25,000
$25,000 to $75,000
Re‐inspection Fee
Over $75,000
Street Frontage Improvements Fee‐In‐Lieu:1
Miscellaneous Fees:
5 Applies only if permit review is requested by the applicant to be performed on Saturdays, Sundays, observed City of Renton holidays, and non‐holiday Monday‐Fridays outside of the hours of city staff regular work schedule
6 Any work performed by City forces or under City contract on behalf of a permit applicant to repair damage to the City infrastructure or caused by the permit applicant or contractor under its control, or any and all roadway or
right‐of‐way cleanup efforts performed by City forces or under City contract that resulted from the work performed by the permit applicant or contractors under its control.
1 Bond required pursuant to RMC 9‐10‐5
3 The fixed application fee established herein is intended to cover the City’s internal administrative costs in processing and administering the franchise. In addition to the fixed application fee, the City may require applicants to
either directly pay or reimburse the City for external costs reasonably incurred to process the application and/or administer the franchise agreement. The City may require applicants to deposit funds in advance to cover legal
and/or other professional services fees as they are incurred.4 The City may decide to contract with a consultant to perform plan reviews and inspections and may bill such costs and expenses directly to the applicant.5 If a franchise agreement does not specify the fee amount, the generic fee, as identified in this fee schedule, shall be collected.6 Regular hours and standard after hour and overtime fees apply.
11 Except those single family and two family uses that utilize right of way along a waterfront.12 Right‐of‐way value shall be based on the assessed value of the land adjoining the property as established by the King County Assessor.
Street with existing storm drainage main line
Public Works Reimbursement6
Standard or minor drainage adjustment review
All eligible uses except Single Family Additions less than 1,160 sq ft:
7A no fee permit may be issued for the following: individual homeowners performing work in street ROW for street tree or parking strip irrigation systems; residential moving pods or moving trucks provided that they are in the
ROW for no more than three (3) days; use in CD zone provided ground disturbing activity is not proposed; and work associated with City of Renton capital improvement projects or City funded projects.
8 A no fee permit may be issued for the following: A public agency and when the proposed use of the right‐of‐way provides a direct service to the public (e.g., Metro applications for right‐of‐way for bus shelters); and work
associated with City of Renton capital improvement projects or City funded projects.9 Leasehold excise tax (LET) imposed pursuant to Chapter 82.29A RCW on leasehold interests for the use of real or personal public property shall be collected from the permittee at a rate established by the State of Washington.
3 Applies only to those fees that are noted as time and materials and performed during city staff regular work schedule.
Single Family Additions less than 1,160 Sq Ft: Proportional share of the fee in lieu of all eligible uses fee based
on square footage of addition.
(2)(Sq Ft of addition / 1,160 sq ft) of Fee‐in‐lieu (Sq Ft of addition / 1,160 sq ft) of Fee‐in‐lieu
Permit review staff overtime5
Regular Staff Review and Inspection Hours3
4 Applies to inspections performed on Saturdays, Sundays, observed City of Renton holidays, and non‐holiday Monday‐Fridays outside the hours of 7:00am to 3:30pm.
SECTION XII. DEVELOPMENT FEES (CONTINUED)
Site Work, Utilities, and Right of Way Fees: (Continued)
Right of Way Use Permits Fees1 (Continued)
10 Insurance Required: Public Liability and property damage insurance is also required pursuant to RMC 9‐2‐5B, Minimum Permit Requirements for Excess Right‐of‐Way Use.
King County ROW Permits/Inspections:
Single family and two family uses11; fee assessed annually plus leasehold excise tax (LET)9, if
applicable
Duration greater than thirty (30) days but no more than one (1) year:
Duration greater than one (1) year8,10:
0.5% x Value12 + LET9 0.5% x Value12 + LET9(ii)
$50 + LET9 $50 + LET9
Street with existing conveyance ditch
2 Work and/or use of the right of way, including those associated with a Civil Construction Permit and excludes utilities from other public agencies and service providers which shall be considered under a franchise permit.
Short‐Term ROW
Permit Fee + LET9
Short‐Term ROW
Permit Fee + LET9Within City Limits8; Short‐Term ROW Permit Fee associated with use plus leasehold excise tax (LET)9
Service Installation Only
Utility Extension per 100' of Length (Min 200' Length)
All uses without public benefit; fee is a per month charge assessed annually based on property value12
of land to be utilized, plus leasehold excise tax9, if applicable.
(a)
Long Term ROW Permit Fees (duration over 30 days)2:
2 Unscheduled work includes, but is not limited to, site work that is found to be occurring, or did occur, for which an inspection was not scheduled. Fee is subject to be applied for each occurrence but does not replace a stop
work order or other code violation as determined applicable by the City. The fee is in addition to any other applicable inspection fees. The fee may provide day of inspection at the discretion and availablility of the City inspector.
13
City of Renton Fee Schedule
2023‐2024
2023 2024
4.
5.0% 5.0%
5.
a.
(i)
(1)$11,377 $11,377
(2)$4,718 $4,718
(ii)
(1)$0.00 $0.00
(2)$0.00 $0.00
(iii)
(1)$2,911 $2,911
(2)$3,697 $3,697
(iv)5% x School Impact Fee 5% x School Impact Fee
b.
(i)$10.68 $10.68
(ii)$7,550.02 $7,550.02
(iii)$6.02 $6.02
(iv)$248.51 $248.51
(v)$261.04 $261.04
(vi)$6,345.23 $6,345.23
(vii)$249.31 $249.31
(viii)$54.94 $54.94
(ix)$69.16 $69.16
(x)$157.10 $157.10
(xi)$159.44 $159.44
(xii)$203.13 $203.13
(xiii)$73,411.90 $73,411.90
(xiv)$98,150.27 $98,150.27
(xv)$16.39 $16.39
(xvi)$40.49 $40.49
(xvii)$8.76 $8.76
(xviii)$4,819.16 $4,819.16
(xix)$8.04 $8.04
(xx)$2,570.22 $2,570.22
(xxi)$37.02 $37.02
(xxii)$2.89 $2.89
(xxiii)$7,228.75 $7,228.75
(xxiv)$4,417.57 $4,417.57
(xxv)$722.88 $722.88
(xxvi)$2,007.98 $2,007.98
(xxvii)$68.51 $68.51
(xxviii)$3,293.10 $3,293.10
(xxix)$29.88 $29.88
(xxx)$12,208.54 $12,208.54
(xxxi)$73.97 $73.97
(xxxii)$8,031.94 $8,031.94
c.
(i)$3,276.44 $3,276.44
(ii)$2,659.70 $2,659.70
(iii)$2,531.21 $2,531.21
(iv)$2,222.84 $2,222.84
(v)$2,325.63 $2,325.63
d.
(i)$829.77 $829.77
(ii)$964.53 $964.53
(iii)$1.29 $1.29
(iv)$3.92 $3.92
(v)$0.26 $0.26
(vi)$1.99 $1.99
(vii)$1.25 $1.25
(viii)$2.36 $2.36
(ix)$5.92 $5.92
(x)$0.15 $0.15
(xi)$0.56 $0.56
(xii)$0.72 $0.72
(xiii)$4.48 $4.48
1 This fee shall be $0 for Accessory Dwelling Units (ADU).
1 This fee shall be $0 for Accessory Dwelling Units (ADU).
Restaurant/lounge, per sq foot
Multi‐family: 5 or more units
Mobile home
Fire Impact Fees:
Residential ‐ single family (detached dwellings & duplexes), per dwelling unit
Residential ‐ multi family & Accessory Dwelling Unit (ADU)1, per dwelling unit
Multi‐family: 3 or 4 units
Hotel/motel/resort, per sq foot
Medical care facility, per sq foot
Office, per sq foot
Medical/dental office, per sq foot
Retail, per sq foot
Leisure facilities, per sq foot
Industrial/manufacturing, per sq foot
Church, per sq foot
Education, per sq foot
Special public facilities, per sq foot
*(i)‐(ii) is per unit
*(iii)‐(xiii) is per square foot
Park Impact Fees:
Single family
Multi‐family: 2 units, Duplexes, & Accessory Dwelling Unit (ADU)1
Motel, per room
Gas station with convenience store, per pump
Gas station, per pump
General office, per sq foot
Health/fitness club, per sq foot
Hospital, per sq foot
Hotel, per room
Manufacturing, per sq foot
Marina, per boat berth
Medical office, per sq foot
Mini‐warehouse, per sq foot
Mobile home, per dwelling
Movie theater, per seat
Nursing home, per bed
Restaurant: sit‐down, per sq foot
Senior housing ‐ detached, per dwelling
Shopping center, per sq foot
Single family house, per dwelling
Supermarket, per sq foot
1 This fee shall be $0 for Accessory Dwelling Units (ADU).
Net New PM Peak Hour Person Vehicle Trip (Proposed ‐ Existing), per PM Peak Hour Person Vehicle Trip
Fast food, with drive‐up, per sq foot
Light Industrial, per sq foot
Apartment, per dwelling & Accessory Dwelling Unit (ADU)1
Church, per sq foot
Coffee/Donut Shop, no drive up, per sq foot
Coffee/Donut Shop, with drive up, per sq foot
Condominium & Duplexes per dwelling
Convenience market ‐ 24 hour, per sq foot
Daycare, per sq foot
Drinking Place, per sq foot
Drive‐in bank, per sq foot
Fast food, no drive‐up, per sq foot
Technology Surcharge Fee
Impact Fees:
SECTION XII. DEVELOPMENT FEES (CONTINUED)
Transportation Impact Fees:
School Impact Fees:
Issaquah School District
Single Family Fee
Multi Family, Duplex, & Accessory Dwelling Fee (ADU)
Kent School District
Single Family Fee
Multi Family, Duplex, & Accessory Dwelling Fee (ADU)
Renton School District
Single Family Fee
Multi Family, Duplex, & Accessory Dwelling Fee (ADU)1
School Impact Fee Administration
An additional technology surcharge shall be required for all fees included in the following Subsections of Section XII, Development
Fees, of the City of Renton Fee Schedule Brochure: Subsection 1, Building Fees; Subsection a, except for appeals, critical areas
review fee, and direct EIS costs, of subsection 2, Land Use Review Fees; Subsections a, b, c(iii), d, and e, except Master
Franchise/Small Cell Permit Application Fee and Long Term ROW Permit Fees (duration over one year), of subsection 3, Site Work,
Utilities, and Right of Way Fees; and Section XIII, Fire Department Fire Marshall Fees
1 This fee shall be $0 for Accessory Dwelling Units (ADU).
14
City of Renton Fee Schedule
2023‐2024
2023 2024
5.
e.$560 $560
f.
(i)$100 $100
(ii)$100 $100
6.
a.$1,000.00 $1,000.00
b.
(i)$225.00 $225.00
(ii)$500.00 $500.00
SECTION XIII. FIRE DEPARMENT FIRE MARSHAL FEES (RFA)2023 2024
a.
(i)$50 $50
(ii)$50 + 2% of the cost $50 + 2% of the cost
(iii)$75 + 2% of the cost $75 + 2% of the cost
(iv)$200 + 1.5% of the cost $200 + 1.5% of the cost
(v)$450 + 1.2% of the cost $450 + 1.2% of the cost
(vi)$950 + .75% of the cost $950 + .75% of the cost
(vii)
(viii)
(ix)
(x)
(1)N/C N/C
(2)$75 $75
(3)$150 $150
(xi)$35 $35
b.
$150 $150
$75 $75
(iii)$250 $250
(vii)$200 $200
(ix)WFC Current Wage and
Equipment Rate
WFC Current Wage and
Equipment Rate
(x)$25 $25
(VIII) Non‐emergency Billable Services (ie: boat assists, etc) Rates published at:
www.washingtonfirechiefs.com
Third and subsequent re‐Inspection/Pre‐Citation Follow‐Up Inspection when re‐inspections are required beyond
the first and second re‐inspections
Construction permit:
Operational fire code permit (issued in accordance with Section 105.6 of the IFC) fee is yearly (includes items such
as fire special events, covered stages, mobile food facilities, hot works, etc.)
Permits for Mobile food facilities that have passed a fire and life safety inspection in another jurisdiction that has
reciprocity with Renton RFA
Hazardous materials and HPM facilities yearly
Late Payment Penalty
Violation/Second Re‐Inspection after 30‐day period (whenever 30 days or more have passed since Fire Department
notification of a violation, which required a first re‐inspection, and such violation has not been remedied or
granted an extension)
Preventable Fire alarm fee:
First, second, and third preventable alarms
Fourth and fifth preventable alarms in a calendar year, fee is per each alarm.
Sixth preventable alarm and successive preventable alarms in a calendar year, fee is per each alarm.
Fire Permit type:
(i)
(ii)
(iv)
$175 $175
5%5%
Other requested inspection when not required by the fire code. Fee is per hour with a minimum 1 hr when
approved by the Fire Marshal, such as home daycares
RFA technology surcharge fee applied to Fire Department Fire Marshal Fees, subsection a. (i, ii, iii, iv, v, vi) and
subsection b. (iii)
NSF check fees
20% of plan review fee ‐
Min. $75
20% of plan review fee ‐
Min. $75
$250 $250
See Fire plan review and
construction permit fees
See Fire plan review and
construction permit fees
Underground tank removal permit (commercial)
Hazardous production materials permit (for businesses storing, handling, or using hazardous production materials
as regulated in the fire code) permit is yearly
(v)
Independent Fee Calculation Review (or unless otherwise established by School District or Renton Regional Fire Authority)
SECTION XII. DEVELOPMENT FEES (CONTINUED)
Impact Fees: (Continued)
Impact Fee Deferral Administration:
Each Lot, Single Family Dwelling, or Condominium
Each Multi‐family Building
$175
Fire plan review and inspection fees:
$100,000.00 and above
Construction Re‐inspection. Fee is per hour with a 2 hour minimum. The minimum may be assessed if the
requested inspection does not meet the approval of the inspector.
$0 to $249.99
$250.00 to $999.99
$1,000.00 to $4,999.99
$5,000.00 to $49,999.99
$50,000.00 to $99,999.99
$175
$150 $150
Multifamily Tax Exemption Application
Tree Fee in lieu, credit replacement, and/or credit supplement
Per diameter inch measured at 4.5 feet above grade
Labor cost for each 2" caliper (or 6ft tall) tree to be planted
Miscellaneous Fees
$250 $250
(xi)
(viii)
Underground tank removal or abandonment‐in‐ place permit (residential)
(vi)
15
City of Renton Fee Schedule
2023‐2024
2023 2024
3.
a.RMC 2‐9‐8.C $73 $73
i. RMC 2‐9‐8.C.1 $73 $73
ii.RMC 2‐9‐8.C.2 $73 $73
iii.RMC 2‐9‐8.C.3 $73 $73
iv.RMC 2‐9‐8.C.4 $73 $73
v.RMC 2‐9‐8.C.5 $73 $73
vi.RMC 2‐9‐8.C.6 $73 $73
vii.RMC 2‐9‐8.C.7 $73 $73
viii.RMC 2‐9‐8.C.8 $73 $73
ix.RMC 2‐9‐8.C.9 $73 $73
x.RMC 2‐9‐8.C.10 $73 $73
xi.RMC 2‐9‐8.C.11 $73 $73
xii.RMC 2‐9‐8.C.12 $73 $73
xiii.RMC 2‐9‐8.C.13 $73 $73
xiv.RMC 2‐9‐8.C.14 $73 $73
xv.RMC 2‐9‐8.C.15 $73 $73
xvi.RMC 2‐9‐8.C.16 $73 $73
xvii.RMC 2‐9‐8.C.17 $73 $73
xviii.RMC 2‐9‐8.C.17 $73 $73
b.RMC 4‐5‐070.C.102 $49 $49
c.RMC 5‐4‐1 $49 $49
d.RMC 6‐14‐22 $50 $50
i. RMC 6‐14‐3 $50 $50
ii.RMC 6‐14‐4 $50 $50
iii.RMC 6‐14‐5 $50 $50
iv.RMC 6‐14‐6 $50 $50
v.RMC 6‐14‐7 $50 $50
vi.RMC 6‐14‐8 $50 $50
vii.RMC 6‐14‐10 $50 $50
viii.RMC 6‐14‐11
$50 $50
ix.RMC 6‐14‐12 $50 $50
x.RMC 6‐14‐13
$50 $50
xi.RMC 6‐14‐14
$50 $50
xii.RMC 6‐14‐15 $50 $50
xiii.RMC 6‐14‐16 $50 $50
xiv.RMC 6‐14‐17 $50 $50
xv.RMC 6‐14‐18 $50 $50
xvi.RMC 6‐14‐19 $50 $50
xvii.RMC 6‐14‐20 $50 $50
e.RMC 6‐6‐1.A $49 $49
f.RMC 6‐6‐5.A $49 $49
g.RMC 9‐17‐10 $100 $100
h.RMC 9‐3‐5 $42 $42
i.RMC 9‐3‐7 $42 $42
j.RMC 9‐3‐10 $122 $122
k.RMC 9‐3‐26 $42 $42
l.RMC 9‐3‐31 $42 $42
m.RMC 10‐12‐25 $67 $67
n.RMC 10‐12‐26 $42 $42
o.RMC 10‐12‐27 $42 $42
p.RMC 10‐12‐28.C $42 $42
q.RMC 10‐12‐28.D $42 $42
r.RMC 10‐12‐28.E.1 $42 $42
s.RMC 10‐12‐28.E.2 $42 $42
t.RMC 10‐12‐28.F $42 $42
u.RMC 10‐12‐28.G $42 $42
v.RMC 10‐12‐28.H $42 $42
w.RMC 10‐2‐5 $47 $47
$48 $48
Violation of Park Rules (Civil Infraction)
Possession/Sale/Discharge of Fireworks
SECTION XIV. MONETARY PENALTY SCHEDULE FOR INFRACTIONS ISSUED UNDER THE AUTHORITY OF CHAPTER 7.80
Effect of Schedule. This schedule establishes default base penalties for violations of the Renton Municipal Code that are issued as infractions under the authority of RCW 7.80 RCW, but these
penalties do not include any state‐imposed statutory assessments. Except as otherwise prohibited by law or court rule, a court with jurisdiction over the infraction may impose on a defendant a lesser
penalty in an individual case. Provided that, whenever the base penalty plus mandatory statutory assessments results in a total payment that is not an even dollar amount, the base penalty is deemed
to be amended to a higher amount which produces the next greatest even dollar total
Penalties Established by Court Rule or Specific Penalty Established by Law. This schedule does not apply to penalties established by state or local court rule or to a penalty that is established in law
with a specific amount (i.e. ordinance or statute setting a penalty equal to a specified amount rather than a penalty up to a maximum amount). To the extent a penalty scheduled herein conflicts with
a state or local court rule or a penalty that is established in law, this schedule shall be deemed preempted by the court rule or penalty established in law
Penalties:
The following violations shall carry the following listed default base penalty, not including statutory assessments:
1.
2.
Fire/Barbeque in Park
Activities Prohibited in a Park
Disregard Park Trail Sign
Unauthorized Vehicle in a Park
Operating Motorized Vehicle on Park Trail
Dismount Zone Violation
Speeding on Trails
All other violations identified by Renton Municipal Code as an infraction not listed or otherwise specified by court rule or law.
Animal Control – No License
Littering
Animal Control – Animal at Large
Animal Control – Animal/Fowl Habitual Noise
Violation of ATV Ordinance
Inattentive Driving
Truck Route Violation
Avoiding Intersection
Encroachment on Public Property
Negligent Operation of Watercraft
Speed Regulations of Watercraft
Obstructions of Waterways
Equipment Numbering Violation
Violation of Rules of the Road
Litter Thrown By Persons in Vehicles
Vehicle/Boat Repair in Park
Racing in Park
SCUBA Diving in Park
Camping/Overnight Stay in Parks
Metal Detecting
Glass Container in Park with Swimming Area
Group Rally/Special Use Permit
Parking & Mooring Violation
City Events Violation
Alcohol in Park
Smoking in Park
Litter in Public Spaces
Placement of Litter in Receptacles
Sweeping Litter in Gutters
Merchants’ Duty
Truck Loads Causing Litter
Litter in Lakes and Fountains
Throwing/Distributing Commercial Handbills in
Public Places
Placing Handbills on Vehicles
Depositing Handbills on Uninhabited/Vacant
Premises
Prohibiting Distribution of Handbills Where
Properly Posted
Distributing Handbills at Inhabited Private Premises
Dropping Litter from Aircraft
Posting Notices Prohibited
Litter on Occupied Private Property
Owner to Maintain Premises Free of Litter
Litter of Vacant Lots
Unsafe Use of Scooter
Operating Scooter When Prohibited
Use of Scooter Where Prohibited
Use of Scooter Without a Helmet
No Reflectors on Scooter
No Muffler on Scooter
Scooter Operator Under Age 13
16