Loading...
HomeMy WebLinkAboutSR_Hazen_HS_Portables_230727_FINALDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT SR_Hazen HS Portables_230727_FIN A. ADMINISTRATIVE REPORT & DECISION Decision: APPROVED APPROVED SUBJECT TO CONDITIONS DENIED Report Date: July 28, 2023 Project File Number: PR23-000068 Project Name: Hazen High School Portables Land Use File Number: LUA23-000127, SA-A Project Manager: Alex Morganroth, Senior Planner Owner: Renton School District No. 403, Matthew Feldmeyer, Executive Director, Capital Planning and Construction, 300 SW 7th St, Renton, WA 98057 Applicant/Contact: Lisa Klein, AHBL /2215 N 30th St, Tacoma , WA 98402 / klein@ahbl.com Project Location: 1101 Hoquiam Ave NE (APN 1023059278) – Hazen High School Project Summary: The applicant, the Renton School District (RSD), is requesting Administrative Site Plan Review in order to add four (4) portable classroom buildings at the Hazen High School site located at 1101 Hoquiam Ave NE (to be constructed on APN 1023059278). The site is approximately 33.3 acres in size and is developed with multiple school buildings, surface parking, and sports fields. The area of the site where the portables are proposed to be placed has a Comprehensive Plan Land Use of Designation of Residential Medium Density and a zoning designation of Residential-8 (R-8) dwelling units per net acre (du/ac). According to the applicant, each portable is 64 feet long and 28 feet wide with a total area of 1,792 sq. ft. Each building contains two (2) classrooms and has two (2) entrances accessed via aluminum stairs or a central ADA ramp. The four (4) portables will occupy a total area of 7,168 sq. ft. of an existing surface parking lot on the north of the site. Approximately 51 parking stalls would be eliminated as a result of the building placement. The proposal would not result in the removal of any landscaping or trees on the site. No new impervious surface is proposed. According to COR Maps, sensitive slopes are mapped on the site. The applicant submitted an Environmental Determination of Non-Significance, a Drainage Memo, and a Transportation Analysis with the application. Site Area: 33.3 ac Project Location Map DocuSign Envelope ID: CF47A1ED-D2D0-48F7-B909-4ACAFFC7A3EB City of Renton Department of Community & Economic Development Hazen High School Portables Administrative Staff Report LUA23-000127, SA-A Report of July 28, 2023 Page 2 of 23 B. EXHIBITS: Exhibit 1: Admin Decision Exhibit 2: Site Plan Exhibit 3: Civil Plan Sheets Exhibit 4: Boundary Survey Exhibit 5: Determination of Non-Significance SEPA Consultation issued by the Renton School District, dated April 7, 2023 Exhibit 6: Architectural Elevations Exhibit 7: Drainage Memo, prepared by Jacobson Consulting Engineering, dated April 24, 2023 Exhibit 8: Traffic Memo, prepared by Heffron Transportation Inc, dated March 1, 2023 Exhibit 9: Transportation Concurrency Memo, prepared by Brianne Bannwarth, dated April 28, 2023 Exhibit 10: Advisory Notes C. GENERAL INFORMATION: 1. Owner(s) of Record: Renton School District No. 403, Matthew Feldmeyer, Executive Director, Capital Planning and Construction, 300 SW 7th St, Renton, WA 98057 2. Zoning Classification: Residential-8 (R-8) 3. Comprehensive Plan Land Use Designation: Residential Medium Density (RMD) 4. Existing Site Use: High School 5. Critical Areas: Sensitive slopes 6. Neighborhood Characteristics: a. North: Single-family residential; Residential-8 (R-8) zone b. East: Single-family residential; Residential-8 (R-8) zone c. South: Single-family residential; Residential-8 (R-8) zone d. West: Single-family and multi-family residential; Residential-8 (R-8) and Commercial Arterial (CA) zones 7. Site Area: 33.3 ac D. HISTORICAL/BACKGROUND: Action Land Use File No. Ordinance No. Date Hazen Annexation A-75-002 2945 07/16/1975 Site Plan Review and Variance LUA99-137 N/A 03/22/2000 DocuSign Envelope ID: CF47A1ED-D2D0-48F7-B909-4ACAFFC7A3EB City of Renton Department of Community & Economic Development Hazen High School Portables Administrative Staff Report LUA23-000127, SA-A Report of July 28, 2023 Page 3 of 23 Site Plan Review LUA09-138 N/A 01/26/2010 Comprehensive Plan N/A 5758 06/22/2015 Zoning N/A 5758 06/22/2015 E. PUBLIC SERVICES: 1. Existing Utilities a. Water: The proposed development is within the City’s water service area. There is an existing 10” water main that runs east/west just south of the site’s northern property line in NE 12th St, which is an unimproved gravel access road for adjacent properties and the City’s water tower. The existing water main loops around the high school to provide fire flow and supply the nearby hydrants that can deliver a maximum flowrate of 2,500-3,000 gallons per minute (gpm) with a static water pressure ranging from 40-45 psi. It continues north to the water tower property north of the site and west to the City’s distribution system in Duvall Ave NE. b. Sewer: The proposed development is within the City’s sewer service area. There is an existing 8” PVC sewer flowing west to east at the intersection of Hoquiam Ave NE and NE 12th St adjacent to the site’s northeast corner. There is also an existing 8” PVC sewer flowing west to east at the intersection of Hoquiam Ave NE and NE 11th Ct adjacent to the site’s east property line. c. Surface/Storm Water: The site contains only minor steep slope hazard areas. The site topography is bisected at a high point near the middle of high school with the north half generally sloping to the north and collected by onsite conveyance and the south half generally sloping to the south and collected by the onsite conveyance system. City records show that the majority of the site is collected and conveyed to the southwest through a series of private stormwater facilities which ultimately discharge into the public storm drainage system in NE 10th St. A portion of the northeast school parking lot is collected and conveyed via private storm drainage system that flows north in Hoquiam Ave NE. A portion of the southeast school parking lot, ball fields and tennis courts is collected and routed into the conveyance system in Hoquiam Ave Ne that runs north to south (see City stormwater plan no. R-28510C). City records indicate three (3) discharge points from the site with one (1) discharge at the site’s northeast corner, another at the site’s east property line close to the site’s southeast corner, and the other at the site’s southwest corner. 2. Streets: The site fronts Hoquiam Ave NE, a Minor Arterial Road with an existing ROW width of sixty feet (60’) along the east property line. 3. Fire Protection: Renton Regional Fire Authority (RRFA) F. APPLICABLE SECTIONS OF THE RENTON MUNICIPAL CODE: 1. Chapter 2 Land Use Districts a. Section 4-2-020: Purpose and Intent of Zoning Districts b. Section 4-2-070: Zoning Use Table c. Section 4-2-110: Residential Development Standards 2. Chapter 3 Environmental Regulations a. Section 4-3-050: Critical Area Regulations 3. Chapter 4 Property Development Standards 4. Chapter 6 Streets and Utility Standards a. Section 4-6-060: Street Standards DocuSign Envelope ID: CF47A1ED-D2D0-48F7-B909-4ACAFFC7A3EB City of Renton Department of Community & Economic Development Hazen High School Portables Administrative Staff Report LUA23-000127, SA-A Report of July 28, 2023 Page 4 of 23 5. Chapter 9 Permits – Specific a. Section 4-9-200: Master Plan and Site Plan Review 6. Chapter 11 Definitions G. APPLICABLE SECTIONS OF THE COMPREHENSIVE PLAN: 1. Land Use Element H. FINDINGS OF FACT (FOF): 1. The Planning Division of the City of Renton accepted the above master application for review on April 27, 2023 and determined the application complete the same day. The project complies with the 120-day review period. 2. The project site is located 1101 Hoquiam Ave NE, made of multiple parcels (APN 1023059057, 1023059278, 1023059201, 1023059277, 1023059094, 1023059292, 1023059084, 1023059072). All work would occur on a single parcel on the campus site (APN 1023059278). The project site is currently developed with the Hazen High School campus. 3. Access to the site would remain via four (4) existing driveways off of Hoquiam Ave NE. 4. A total of 465 existing parking stalls are located on the site. Additionally, 16 uncovered bicycle parking spaces are provided on site near the front building entrance. The applicant has proposed the removal of 51 parking stalls and addition of 18 bicycle spaces. 5. The project proposes constructing four (4) portable classroom buildings. Each portable would be approximately 64 feet long by 28 feet wide for a total area of 1,792 sq. ft. Each portable would have two (2) aluminum stair systems and a central ADA ramp for access. The tallest point of each portable building would be sixteen feet (16’) as measured from existing grade. 6. The property is located within the Residential Medium Density (RMD) Comprehensive Plan land use designation. 7. All parcels comprising the Hazen High School site are located within the Residential-8 (R-8), except for one parcel on the west side of the site zoned Residential Multi-family (RM-F). 8. The site topography is bisected at a high point near the middle of high school with the north half generally sloping to the north and the south half generally sloping to the south. 9. No trees are proposed for removal. 10. The site is mapped with sensitive slopes, however no sensitive slopes are within vicinity of the location of the portables. 11. Minimal cutting is proposed for the utility trenching. 12. The applicant is proposing to begin construction in summer of 2023 and end in the fall of 2023. 13. Staff received no public comment letters. 14. No other public or agency comments were received. 15. The Renton School District acted as lead agency for the State Environmental Policy Act (SEPA) Review for the project. On April 7, 2023 the Renton School District issued a Determination of Non-Significance (DNS) for the Hazen High School project (Exhibit 5). A 14-day comment period commenced on April 7, 2023 and ended on April 21, 2023. No comments were received on the threshold determination according to the Renton School District. DocuSign Envelope ID: CF47A1ED-D2D0-48F7-B909-4ACAFFC7A3EB City of Renton Department of Community & Economic Development Hazen High School Portables Administrative Staff Report LUA23-000127, SA-A Report of July 28, 2023 Page 5 of 23 16. Representatives from various city departments have reviewed the application materials to identify and address issues raised by the proposed development. These comments are contained in the official file, and the essence of the comments has been incorporated into the appropriate sections of this report and the Departmental Recommendation at the end of this report. 17. Comprehensive Plan Compliance: The site is designated Residential Medium Density (RMD) on the City’s Comprehensive Plan Map. The purpose of the MD designation is to allow a variety of single-family and multi-family development types, with continuity created through the application of design guidelines, the organization of roadways, sidewalks, public spaces, and the placement of community gathering places and civic amenities. The proposal is compliant with the following development standards if all conditions of approval are met: Compliance Comprehensive Plan Analysis  Policy L-2: Support compact urban development to improve health outcomes, support transit use, maximize land use efficiency, and maximize public investment in infrastructure and services.  Goal L-BB: Maintain a high quality of life as Renton grows by ensuring that new development is designed to be functional and attractive.  Goal L-FF: Strengthen the visual identity of Renton and its Community Planning Areas and neighborhoods through quality design and development.  Policy L-50: Maintain existing, and encourage the creation of additional places and events throughout the community where people can gather and interact. Allow for flexibility in public gathering places to encourage place-making efforts and activities.  Policy L-52: Include human-scale features such as pedestrian pathways, quality landscaping, and public spaces that have discernible edges, entries, and borders to create a distinctive sense of place in neighborhoods, commercial areas, and centers.  Policy L-57: Complement the built environment with landscaping using native, naturalized, and ornamental plantings that are appropriate for the situation and circumstance and which provide for respite, recreation, and sun/shade.  Policy CF-10: Coordinate with federal, state, regional and local jurisdictions, private industry, businesses and citizens in the planning, design and development of facilities serving and affecting the community. 18. Zoning Development Standard Compliance: The specific parcel (APN 1023059278) the proposed portable classrooms would be located on is classified Residential-8 (R-8) on the City’s Zoning Map. The R-8 Zone is established for single-family residential dwellings and is intended to implement the Residential Medium Density Comprehensive Plan Designation. The proposal is compliant with the following development standards, as outlined in RMC 4-2-110.A, if all conditions of approval are met: Compliance R-8 Zone Development Standards and Analysis N/A Density (R-8): The allowed density range in the R-8 zone is a minimum of 4.0 to a maximum of 8.0 dwelling units per net acre. Net density is calculated after the deduction of sensitive areas, areas intended for public right-of-way, and private access easements. Staff Comment: No dwelling units are proposed. DocuSign Envelope ID: CF47A1ED-D2D0-48F7-B909-4ACAFFC7A3EB City of Renton Department of Community & Economic Development Hazen High School Portables Administrative Staff Report LUA23-000127, SA-A Report of July 28, 2023 Page 6 of 23  Lot Dimensions (R-8): The minimum lot size permitted in the R-8 zone is 5,000 sq. ft. A minimum lot width of 50 feet is required (60 feet for corner lots) and a minimum lot depth of 80 feet is required. Staff Comment: The subject parcel that the portables would be built on is approximately 178,596 sq. ft. (4.1 acres) in size with a width of 345 feet and a depth of 632 feet. Therefore, the existing lot exceeds the minimum lot size, width and depth standards.  Setbacks (R-8): The required setbacks in the R-8 zone are as follows: front yard is 20 feet, side yard is 5 feet, secondary front yard (applies to corner lots) is 15 feet, and the rear yard is 25 feet. Staff Comment: The four (4) proposed portable classroom buildings would have a front yard setback of approximately 70 feet from the front property line (east). Side yard setbacks for the proposed buildings would be approximately 67 feet (north) and 200 feet (south). The rear yard setback (west) would be approximately 223 feet. Therefore, the buildings would comply with all setbacks upon completion. Compliance not yet demonstrated Building Standards (R-8): The R-8 zone has a maximum building coverage of 50% and a maximum impervious surface coverage of 65%. The allowed height of public facilities shall be determined through site plan review. Staff Comment: Upon installation of the portable classroom buildings, the building coverage on site would be approximately 60,954 square feet, or 34% (178,596 sq. ft. / 60,954 sq. ft = .034). Due to the complexity of the site and dispersed landscaping elements, compliance with the impervious surface coverage could not be verified. The portable classroom buildings would be installed within an existing parking lot and would not result in an increase of impervious surface coverage on the site. However, the applicant would be required to demonstrate compliance with the impervious surface coverage requirements at the time of formal building permit application review. The tallest point of the proposed portable classroom would be approximately 16 feet above grade. See analysis under FOF 19: Site Plan Review; Structure Scale for additional height analysis. Compliance with the building coverage, impervious coverage, and height requirement would also be verified at the time of formal building permit application review. N/A Landscaping: The City’s landscape regulations (RMC 4-4-070) require a 10-foot landscape strip along all public street frontages. Additional minimum planting strip widths between the curb and sidewalk are established according to the street development standards of RMC 4-6-060. Street trees and, at a minimum, groundcover, shall be planted within planting strips pursuant to standards set forth in RMC 4-4- 070F.2. Nonresidential Development in a Residential Zone: A fifteen-foot (15') wide partially sight-obscuring landscaped visual barrier, or ten-foot (10') wide fully sight-obscuring landscaped visual barrier, is required along common property lines. Parking Lots: Vehicle parking lots shall meet minimum landscape standards: All parking lots shall have perimeter landscaping as provided in RMC 4-4-070H.4. Perimeter landscaping may not substitute for interior landscaping. DocuSign Envelope ID: CF47A1ED-D2D0-48F7-B909-4ACAFFC7A3EB City of Renton Department of Community & Economic Development Hazen High School Portables Administrative Staff Report LUA23-000127, SA-A Report of July 28, 2023 Page 7 of 23 Interior Parking Lot Landscaping: Surface parking containing between 51-99 parking spaces shall provide a minimum landscape area of 25 square feet per parking space. Interior parking lot landscaping dimensions are stipulated in RMC 4-4-070H.5 Storm Drainage Facility Landscaping: A landscaping strip with a minimum fifteen feet (15') of width shall be located on the outside of the fence, unless otherwise determined through the site plan review or subdivision review process. The landscape strip shall be located entirely within the boundaries of the storm drainage facility tract when associated with a subdivision. Staff Comment: Per RMC 4-4-080B.1, the landscaping requirements are not applicable to additions that increase the gross square footage of a building by less than one third, other changes in the use of a property or remodel of a structure that requires improvements equal to or greater than fifty percent (50%) of the assessed property valuation. According to the King County Assessor’s office, in 2023, the total assessed value of the property is approximately $36,822,800. According to the applicant, the total estimated value of the work proposed is $1,600,000, or 4.3% of the total value (1,600,000 / 36,822,800 = .043). Therefore, the proposed additions do not trigger compliance with the landscaping regulations in RMC 4-4-080.  Tree Retention: For residential or institutional development, the City’s adopted Tree Retention and Land Clearing Regulations (4-4-130) require the retention of 30 percent of trees. Tree credit requirements shall apply at a minimum rate of thirty (30) credits per net acre based on values for existing or new trees as provided in RMC 4-4- 130H.1.b.v. Significant trees shall be retained in the following priority order: Priority One: Landmark trees; significant trees that form a continuous canopy; significant trees on slopes greater than twenty percent (20%); significant trees adjacent to critical areas and their associated buffers; and significant trees over sixty feet (60') in height or greater than eighteen inches ( 18") caliper. Priority Two: Healthy tree groupings whose associated undergrowth can be preserved; other significant native evergreen or deciduous trees; and other significant non- native trees. Priority Three: Alders and cottonwoods shall be retained when all other trees have been evaluated for retention and are not able to be retained, unless the alders and/ or cottonwoods are used as part of an approved enhancement project within a critical area or its buffer. Staff Comment: The applicant has not proposed the removal of any trees and therefore, the project complies with the tree retention requirements in the R-8 zone. If the applicant proposes removal of any trees as part of an updated landscape plan, a tree retention worksheet would be required to be submitted at the time of building permit application, to ensure compliance with the R-8 zone tree retention standards. Based on a total parcel size of approximately 4.1 acres, the applicant would be required to provide a minimum of 123 tree credits on the parcel. However, alterations to impervious surface are exempt from the tree credit requirements. In addition, the portables are temporary in nature. DocuSign Envelope ID: CF47A1ED-D2D0-48F7-B909-4ACAFFC7A3EB City of Renton Department of Community & Economic Development Hazen High School Portables Administrative Staff Report LUA23-000127, SA-A Report of July 28, 2023 Page 8 of 23  Parking: The parking regulations, RMC 4-4-080, require a specific number of off-street parking stalls be provided based on the number of employees and number of busses to be parked onsite. Staff Comment: The following ratios would be applicable to the site: Use Ratio Required Spaces Senior High School A minimum and maximum of 1 per employee and 1 per every 10 students 1 off-street parking space for each bus of a size sufficient to park each bus. 325 (based on 155 employees and 1,694 students) According to the applicant, the total number of employees and students at the school would not change as a result of the project. Approximately 465 parking stalls on currently located on the site. Installation of the portable classroom buildings would result in the removal of 51 parking stalls, reducing the total number of stalls on site to 414. Based on a total of 155 employees and an approximate enrollment of 1,694 students, the applicant is required to provide 325 total parking stalls in order to meet code. The site currently has significantly more parking stalls than required by code and will continue to after removal of the 51 stalls. While the site would continue to exceed the parking stall maximum after completion of the project, the removal of stalls decreases the non-conformity and therefore the project complies with the parking requirements. The parking conforms to the minimum requirements for drive aisle, parking stall, dimensions and the provision of ADA accessible parking stalls. An existing school bus load and unload area is located off of Hoquiam Ave NE between the south parking lot and the tennis courts. The bus loading area would not be changed as a result of the project. Per RMC 4-4-080F.11 the number of bicycle parking spaces shall be at least equal to 10 percent of the number of required off-street vehicle parking spaces. The school has 16 existing uncovered bicycle parking spaces, fewer than the minimum required. The applicant has proposed adding eighteen (18) additional outdoor bike parking spaces near the proposed portable structures. Therefore, the project complies with the bicycle parking requirements.  Refuse and Recyclables: Per RMC 4-4-090, office, educational and institutional developments require a minimum of 2 square feet per every one thousand (1,000) square feet of building gross floor area be provided for recyclables deposit areas and a minimum of four (4) square feet per one thousand (1,000) square feet of building gross floor area shall be provided for refuse deposit areas. A total minimum area of one hundred (100) square feet shall be provided for recycling and refuse deposit areas. Outdoor refuse and recyclables deposit areas and collection points shall not be located within fifty feet (50') of a lot zoned residential, except by approval through the site development plan review process, or through the modification process if exempt from site development plan review. The gate opening for any separate building or other roofed structure used primarily as a refuse or recyclables deposit area/collection point shall have a vertical clearance of at least eleven (11’) feet but shall not exceed fourteen (14') feet. Staff Comment: After installation of the portable classroom buildings, the gross square footage of all schools buildings would total 60,441 sq. ft., the school is required to DocuSign Envelope ID: CF47A1ED-D2D0-48F7-B909-4ACAFFC7A3EB City of Renton Department of Community & Economic Development Hazen High School Portables Administrative Staff Report LUA23-000127, SA-A Report of July 28, 2023 Page 9 of 23 provide a total area of 121 sq. ft. for recyclables deposit and 242 sq. ft. for refuse deposit, totally 363 sq. ft. The school current provides two (2) 30 cubic yard in a centrally located area south of the main school building. The dumpsters are located in an area approximately 1,000 square feet in size, which far exceeds the minimum area requirement for office, education, and institutional developments. The area the dumpsters are located is not visible from the public ROW and is screened from the surrounding properties by the existing parking lot landscaping along the southern property line. N/A Fences and Retaining Walls: For commercial, industrial, and nonresidential uses, a maximum of eight feet (8') anywhere on the lot provided the fence, retaining wall or hedge does not stand in or in front of any required landscaping or pose a traffic vision hazard. Staff Comment: The applicant has not proposed the installation of any new fencing or retaining walls on the site. Any new fences proposed shall comply with the fence and wall standards in RMC 4-4-040. N/A Screening: All onsite surface mounted utility equipment shall be screened from public view. Screening shall consist of equipment cabinets enclosing the utility equipment, solid fencing or a wall of a height at least as high as the equipment it screens, or a landscaped visual barrier allowing for reasonable access to equipment. Equipment cabinets, fencing, and walls shall be made of materials and/or colors compatible with building materials. All operating equipment located on the roof of any building shall be enclosed so as to be screened from public view. Staff Comment: No surface or roof-mounted equipment is proposed due to the temporary nature of the buildings. If equipment is proposed at the time of building permit submittal, compliance with the screening requirements would be reviewed at that time. 19. Site Plan Review: Pursuant to RMC 4-9-200.B, Site Plan Review is required for all K-12 educational institutions regardless of zone. Site Plan applications are evaluated for compliance with the specific requirements of the RMC 4-9-200.E.3 and the following table contains project elements intended to comply with level of detail needed for Site Plan requests: Compliance Site Plan Criteria and Analysis  a. Comprehensive Plan Compliance and Consistency. Staff Comment: See previous discussion under FOF 17, Comprehensive Plan Analysis. Compliant if conditions of approval are met b. Zoning Compliance and Consistency. Staff Comment: See discussion under FOF 18, Zoning Development Standard Compliance. N/A c. Design Regulation Compliance and Consistency. Staff Comment: The Urban Design Regulations are not applicable to Senior high educational institutions located in R- 8 zone. DocuSign Envelope ID: CF47A1ED-D2D0-48F7-B909-4ACAFFC7A3EB City of Renton Department of Community & Economic Development Hazen High School Portables Administrative Staff Report LUA23-000127, SA-A Report of July 28, 2023 Page 10 of 23 N/A d. Planned action ordinance and Development agreement Compliance and Consistency. Staff Comment: The subject property is not located in a Planned Action Ordinance area and a Development Agreement is not proposed.  e. Off-site Impacts. Structures: Restricting overscale structures and overconcentration of development on a particular portion of the site. Staff Comment: The positioning and size of the new portable buildings on the site is respectful of the neighboring residential-scaled properties due their small sizes relative to the significantly larger main high school building on the campus. Each portable has a gross floor area of approximately 1,792 sq. ft., or approximately 1% the gross floor area of the main high school building (170,791 sq. ft.). In addition, the portables would be installed on a developed portion of the site within an existing parking lot located between the two (2) main wings of the main building. The north side of the existing building is sited approximately 84 feet from the nearest residential-zoned lot and approximately 140 feet to the nearest residential structure. Once installed, the portable classrooms would be sited approximately 65 feet from the nearest residential-zoned lot and approximately 120 feet to the nearest residential structure. While closer to the residential uses north of the site than the main school building, the significantly lesser height and overall size of the proposed portables would not result in an overconcentration of development on the site. In addition, the portables would be mostly hidden from the street (Hoquiam Ave NE) and would therefore not visually impact the residential properties on the east side of Hoquiam Ave SE across from the school campus. Therefore, the school will continue to integrate into the surrounding residential neighborhood and the portable classrooms would not result in an overscale structure or overconcentration of development on any portion of the site. Circulation: Providing desirable transitions and linkages between uses, streets, walkways and adjacent properties. Staff Comment: See “Internal Circulation” under criterion ‘g’ below for analysis. Utilities, Loading and Storage Areas: Locating, designing and screening storage areas, utilities, rooftop equipment, loading areas, and refuse and recyclables to minimize views from surrounding properties. Locate utilities underground consistent with RMC 4-6-090. Staff Comment: The applicant has not proposed any changes to the trash and recyclables area and the structure does not contain any rooftop equipment. See additional analysis under FOF 18: Zoning Development Standard Compliance, Refuse and Recycling. Views: Recognizing the public benefit and desirability of maintaining visual accessibility to attractive natural features. Staff Comment: Due to the small size of the portable classrooms relative to the existing school building and highly developed nature of the campus site, the additions would not significantly impact any of the limited views in the immediate area. Landscaping: Using landscaping to provide transitions between development and surrounding properties to reduce noise and glare, maintain privacy, and generally enhance the appearance of the project. DocuSign Envelope ID: CF47A1ED-D2D0-48F7-B909-4ACAFFC7A3EB City of Renton Department of Community & Economic Development Hazen High School Portables Administrative Staff Report LUA23-000127, SA-A Report of July 28, 2023 Page 11 of 23 Staff Comment: No landscaping is proposed for removal as part of the project. Existing landscaping on site includes parking lot perimeter and interior landscaping, a large treed area on western edge of the campus site, and areas near the central plaza by the front entrance. The existing landscaped areas help provide transitions between campus and the predominantly single-family residential neighborhood while enhancing the overall site. See comment under FOF 18, Zoning Development Standard: Landscaping. Lighting: Designing and/or placing exterior lighting and glazing in order to avoid excessive brightness or glare to adjacent properties and streets. Staff Comment: No lighting was proposed in the land use application submittal documents. If lighting is added to the project, lighting impacts would be evaluated at the time of building permit review.  f. On-site Impacts. Structure Placement: Provisions for privacy and noise reduction by building placement, spacing and orientation. Staff Comment: The proposed portable classroom buildings represent a small increase in the building coverage on the site and would be located on a developed area of the site between two (2) existing building wings. Therefore, the portables would not create privacy or noise issues on the site beyond those found at a typical high school. Structure Scale: Consideration of the scale of proposed structures in relation to natural characteristics, views and vistas, site amenities, sunlight, prevailing winds, and pedestrian and vehicle needs. Staff Comment: The four (4) portables buildings are significantly smaller than the existing structures on the high school campus and would not result in a significant visual change to the building or site due to the small size and locations of portables. Natural Features: Protection of the natural landscape by retaining existing vegetation and soils, using topography to reduce undue cutting and filling, and limiting impervious surfaces. Staff Comment: The applicant has not proposed the removal of any vegetation or trees on the site. In addition, no significant cut or fill has been proposed as the portables are temporary in nature and only minor utility trenching is necessary. No significant natural features are present on the site. Reducing Parking Impervious Areas: Design parking areas to minimize impervious surfaces, including but not limited to: (1) breaking up parking areas and directing stormwater flows to multiple low impact development features such as bioretention areas; (2) locating parking near trees to provide storm water uptake; (3) retaining or adding vegetation to parking areas; (4) placing existing parking that exceeds maximum parking ratios in permeable pavement designed consistent with the Surface Water Design Manual in RMC 4-6-030; and (5) using other low impact development techniques consistent with RMC 4-6-030 Staff Comment: No expansions of the existing surface parking areas are proposed. Landscaping: Use of landscaping to soften the appearance of parking areas, to provide shade and privacy where needed, to define and enhance open spaces, and generally to enhance the appearance of the project. Landscaping also includes the DocuSign Envelope ID: CF47A1ED-D2D0-48F7-B909-4ACAFFC7A3EB City of Renton Department of Community & Economic Development Hazen High School Portables Administrative Staff Report LUA23-000127, SA-A Report of July 28, 2023 Page 12 of 23 design and protection of planting areas so that they are less susceptible to damage from vehicles or pedestrian movements. Staff Comment: See FOF 18, Zoning Development Standard: Landscaping for analysis.  g. Access and Circulation. Location and Consolidation: Providing access points on side streets or frontage streets rather than directly onto arterial streets and consolidation of ingress and egress points on the site and, when feasible, with adjacent properties. Staff Comment: The site is currently accessed via four (4) existing driveways off of Hoquaim Ave NE, the site’s only street frontage. No changes to the access points on the site are proposed. Internal Circulation: Promoting safety and efficiency of the internal circulation system, including the location, design and dimensions of vehicular and pedestrian access points, drives, parking, turnarounds, walkways, bikeways, and emergency access ways. Staff Comment: The applicant has proposed minor changes to the sites pedestrian and vehicular circulation in order to provide adequate spacing for the portable classrooms. For pedestrians, a striped pathway is proposed connecting a sidewalk and landing area southwest of the proposed portables. For vehicles, a drive aisle in the parking lot the portables would be installed on would be removed. Due to removal of the interior parking stalls on either side of the drive aisle, the aisle is no longer necessary. The parking stalls on the perimeter of the lot would continue still be accessible via an existing drive aisle. New curb stops are proposed along the existing stalls adjacent to the portables in order to provide separation between the stalls and buildings. The aisle proposed for removal is not a designated fire lane and therefore emergency vehicle access on the site would not change. The applicant has proposed extruded curbing along the north side of the portables in order to provide separation between the drive aisle and the portable buildings. Overall, the larger site allows for adequate vehicle and pedestrian access via the existing internal driveways and pedestrian linkages connecting the track area, pool building, both parking lots, and the main school building, which will continue after construction of the portable buildings. Loading and Delivery: Separating loading and delivery areas from parking and pedestrian areas. Staff Comment: No changes to the loading and delivery areas are proposed. Transit and Bicycles: Providing transit, carpools and bicycle facilities and access. Staff Comment: Per RMC 4-4-080F.11.a bicycle parking spaces are required at 10% of the number of required off-street parking spaces. See FOF 18: Zoning Standards; Parking for analysis. King County Metro Transit provides bus service in the vicinity of the project site with the closest stops served by Route 105, 114 and Route 240. The routes have stops located approximately 0.5-miles northwest of the site near the intersections of NE Sunset Blvd and Duvall Ave NE. School bus transportation is provided to non-walkers attending the existing high school. DocuSign Envelope ID: CF47A1ED-D2D0-48F7-B909-4ACAFFC7A3EB City of Renton Department of Community & Economic Development Hazen High School Portables Administrative Staff Report LUA23-000127, SA-A Report of July 28, 2023 Page 13 of 23 Pedestrians: Providing safe and attractive pedestrian connections between parking areas, buildings, public sidewalks and adjacent properties. Staff Comment: A new four (4’)-foot wide striped pedestrian pathway is proposed across the parking area in order to connect the central area between the proposed portable buildings with the existing sidewalk system near the main building (Exhibit 3). The pathway would be required to maintain ADA compliance throughout its entire length. See Advisory Notes (Exhibit 10) for additional comments. See above under ‘Internal Circulation’ for additional analysis.  h. Open Space: Incorporating open spaces to serve as distinctive project focal points and to provide adequate areas for passive and active recreation by the occupants/users of the site. Staff Comment: Open space is currently provided on the site via multiple elements including the various sports fields, grassy areas adjacent to the pedestrian walkways, an interior courtyard adjacent south of the proposed portables. No new significant open space is proposed as part of the project and no existing open space would be eliminated.  i. Views and Public Access: When possible, providing view corridors to shorelines and Mt. Rainier, and incorporating public access to shorelines Staff Comment: The proposed structure would not block view corridors to shorelines or Mt. Rainier. The public access requirement is not applicable to the proposal.  j. Natural Systems: Arranging project elements to protect existing natural systems where applicable. Staff Comment: No noteworthy natural systems are located on or adjacent to the site.  k. Services and Infrastructure: Making available public services and facilities to accommodate the proposed use: Police and Fire. Staff Comment: Police and Fire Prevention staff indicated that sufficient resources exist to furnish services to the proposed development, if the applicant provides Code required improvements and fees. This includes the potential installation of one (1) new fire hydrant to serve the two (2) western-most portables. The need for an extra hydrant would be determined by the Renton Regional Fire Authority at the time of formal building permit application review. A Fire Impact Fee, based on amount per square foot per the City of Renton Fee Schedule in effect at the time of building permit application submittal would be applicable to the proposal. Water and Sewer. Staff Comment: Water and sewer service to the site is provided by the City of Renton. The portable classrooms would not be hooked up to either water or sewer. No changes to the existing water or sewer connections are proposed. Drainage. Staff Comment: A Drainage Memorandum prepared by Jacobson Consulting Engineers and dated April 24, 2023 (Exhibit 7) was submitted by the applicant. Based on the City’s flow control map, the site falls within the Flow Control Duration Standard area DocuSign Envelope ID: CF47A1ED-D2D0-48F7-B909-4ACAFFC7A3EB City of Renton Department of Community & Economic Development Hazen High School Portables Administrative Staff Report LUA23-000127, SA-A Report of July 28, 2023 Page 14 of 23 matching Forested Site Conditions and is within the May Creek – Honey Creek Drainage Basin. City records show that the majority of the site is collected and conveyed to the southwest through a series of private stormwater facilities which ultimately discharge into the public storm drainage system in NE 10th St. A portion of the northeast school parking lot is collected and conveyed via private storm drainage system that flows north in Hoquiam Ave NE. A portion of the southeast school parking lot, ball fields and tennis courts is collected and routed into the conveyance system in Hoquiam Ave Ne that runs north to south (see City stormwater plan no. R-28510C). City records indicate three (3) discharge points from the site with one (1) discharge at the site’s northeast corner, another at the site’s east property line close to the site’s southeast corner, and the other at the site’s southwest corner. The memorandum submitted by the applicant states the clearing limits for utility trenching is approximately 1,500 sf. However, the civil plans submitted by applicant (Exhibit 3) show approximately 1,830 sf of replaced impervious. The drainage memo also refers to “two” double-classroom structures in the narrative, while four (4) are proposed. Depending on updates to memo, a full drainage review may be required. Staff accepts the memorandum in lieu of a formal drainage report with the understanding that all phases of the improvements shall meet the requirements of the City of Renton’s adopted surface water design manual at the time of permit submittal, and that a complete Technical Information Report shall be provided at the time of Civil Construction Permit application if deemed required. See Exhibit 10 Advisory Notes for additional comments. Erosion control measures to meet the City requirements shall be provided. Transportation. Staff Comment: The proposed development fronts Hoquiam Ave SE along the east property line for a length of approximately 1,260 feet. 128th Ave SE is classified as a 2- lane Collector arterial with parking and flush 5’ sidewalks on both sides. The road has an existing right-of-way (ROW) width of approximately 60 feet. In order to meet the City’s complete street standards for Collector Arterial streets, the minimum ROW is 83 feet, necessitating approximately 11.5 feet of ROW dedication in front of the site. In addition, half street improvements would include a pavement width of 46 feet (23 feet from centerline), a 0.5-foot curb, an 8-foot planting strip, an 8-foot sidewalk, 2 feet of clear space at back of walk, street trees and storm drainage improvements. The Transportation Analysis prepared by Heffron Transportation, dated March 1, 2023 analyzed the trip rate demand for the school based on the new additions. The analysis concluded that the student enrollment capacity and employment would not change as a result of the proposed portable classrooms and therefore, no additional trips would be created. City Staff concurs with this assessment and concludes that a formal Traffic Impact Analysis is not required. The proposal has passed the City’s Traffic Concurrency Test per RMC 4-6-070.D (Exhibit 9), which is based upon a test of the citywide Transportation Plan, consideration of growth levels included in the LOS-tested Transportation Plan, and future payment of appropriate Transportation Impact Fees. N/A l. Phasing: The applicant is not requesting any phasing. DocuSign Envelope ID: CF47A1ED-D2D0-48F7-B909-4ACAFFC7A3EB City of Renton Department of Community & Economic Development Hazen High School Portables Administrative Staff Report LUA23-000127, SA-A Report of July 28, 2023 Page 15 of 23 N/A m. Stormwater: Providing optimal locations of stormwater infiltrating low impact development facilities. Avoiding placement of buildings or impervious areas on soils with infiltration capability to the maximum extent practicable. Staff Comment: Infiltration is not feasible on the site due to the location of the portables on an existing parking lot. 20. Critical Areas: Project sites which contain critical areas are required to comply with the Critical Areas Regulations (RMC 4-3-050). The proposal is consistent with the Critical Areas Regulations, if all conditions of approval are met: I. CONCLUSIONS: 1. The subject site is located in the Residential Medium Density (RMD) Comprehensive Plan designations and complies with the goals and policies established with this designation, see FOF 17. 2. The subject site is located in the Residential-8 (R-8) zoning designation and complies with the zoning and development standards established with this designation provided the applicant complies with City Code and conditions of approval, see FOF 18. 3. The proposal complies with Site Plan Review decisional criteria provided the applicant complies with City Code and conditions of approval, see FOF 19. 4. The proposal complies with the street standards as established by City Code, provided the project complies with all advisory notes and conditions of approval contained herein, see FOF 19. 5. The proposal complies with the Critical Areas Regulations provided the applicant complies with City Code and conditions of approval, see FOF 20. 6. There are adequate public services and facilities to accommodate the proposal, see FOF 19. 7. A key feature which is integral to this project is the proposed location of the four (4) portables which results in no new impervious surface and no removal of vegetation or trees. Compliance Critical Areas Analysis  Geologically Hazardous Areas: Based upon the results of a geotechnical report and/or independent review, conditions of approval for developments may include buffers and/or setbacks from buffers. A standard 15-foot building setback is required for all structures from Protected Slope areas. A 50-foot buffer and 15-foot building setback are required from Very High Landslide Hazard Areas. Staff Comment: The City’s COR mapping database identifies sensitive slopes (15-40%) located along the western edge of the project site. The proposed portable classroom buildings would be located on mostly flat area of the site currently used as surface parking and would not be located on or near the mapped sensitive slopes. Therefore, the project complies with the Critical Area Regulations in RMC 4-3-050. DocuSign Envelope ID: CF47A1ED-D2D0-48F7-B909-4ACAFFC7A3EB City of Renton Department of Community & Economic Development Hazen High School Portables Administrative Staff Report LUA23-000127, SA-A Report of July 28, 2023 Page 16 of 23 J. RECOMMENDATION: The Hazen High School Portables, File No. LUA23-000127, SA-A, as depicted in the site plan (Exhibit 2) is approved. DATE OF DECISION ON LAND USE ACTION: SIGNATURE: Angie Mathias, Acting Planning Director Date TRANSMITTED on July 28, 2023 to the Owner/Applicant/Contact: Owner: Applicant: Contact: Renton School District No. 403, Matthew Feldmeyer, Executive Director, Capital Planning and Construction, 300 SW 7th St, Renton, WA 98057 Lisa Klein, AHBL /2215 N 30th St, Tacoma , WA 98402 / klein@ahbl.com Lisa Klein, AHBL /2215 N 30th St, Tacoma , WA 98402 / klein@ahbl.com TRANSMITTED on July 28, 2023 to the Parties of Record: None TRANSMITTED on July 28, 2023 to the following: Vanessa Dolbee, Interim CED Administrator Brianne Bannwarth, Development Engineering Director Gina Estep, Economic Development Director Matt Herrera, Current Planning Manager Anjela Barton, Fire Marshal K. LAND USE ACTION APPEALS, REQUEST FOR RECONSIDERATION, & EXPIRATION: The administrative land use decision will become final if the decision is not appealed within 14 days of the decision date. APPEAL: This administrative land use decision will become final if not appealed in writing to the Hearing Examiner on or before 5:00 PM on August 11, 2023. An appeal of the decision must be filed within the 14-day appeal period (RCW 43.21.C.075(3); WAC 197-11-680). Due to the ongoing state of emergency enacted by Governor’s Proclamation 20-28.14 (and as amended), the City Clerk’s Office is working remotely. For that reason, appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted electronically. Appeals to the Hearing Examiner are governed DocuSign Envelope ID: CF47A1ED-D2D0-48F7-B909-4ACAFFC7A3EB 7/28/2023 | 4:05 PM PDT City of Renton Department of Community & Economic Development Hazen High School Portables Administrative Staff Report LUA23-000127, SA-A Report of July 28, 2023 Page 17 of 23 by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. EXPIRATION: The Administrative Site Development Plan Review decision will expire two (2) years from the date of decision. A single two (2) year extension may be requested pursuant to RMC 4-9-200. RECONSIDERATION: Within 14 days of the decision date, any party may request that the decision be reopened by the approval body. The approval body may modify his decision if material evidence not readily discoverable prior to the original decision is found or if he finds there was misrepresentation of fact. After review of the reconsideration request, if the approval body finds sufficient evidence to amend the original decision, there will be no further extension of the appeal period. Any person wishing to take further action must file a formal appeal within the 14-day appeal time frame. THE APPEARANCE OF FAIRNESS DOCTRINE: provides that no ex parte (private one-on-one) communications may occur concerning the land use decision. The Doctrine applies not only to the initial decision, but to Appeals to the Hearing Examiner as well. All communications after the decision/approval date must be made in writing through the Hearing Examiner. All communications are public record and this permits all interested parties to know the contents of the communication and would allow them to openly rebut the evidence in writing. Any violation of this doctrine could result in the invalidation of the appeal by the Court. DocuSign Envelope ID: CF47A1ED-D2D0-48F7-B909-4ACAFFC7A3EB City of Renton Department of Community & Economic Development Hazen High School Portables Administrative Staff Report LUA23-000127, SA-A Report of July 28, 2023 Page 18 of 23 The following exhibits are included with the Administrative report: Exhibit 1: Admin Decision Exhibit 2: Site Plan Exhibit 3: Civil Plan Sheets Exhibit 4: Boundary Survey Exhibit 5: Determination of Non-Significance SEPA Consultation issued by the Renton School District, dated April 7, 2023 Exhibit 6: Architectural Elevations Exhibit 7: Drainage Memo, prepared by Jacobson Consulting Engineering, dated April 24, 2023 Exhibit 8: Traffic Memo, prepared by Heffron Transportation Inc, dated March 1, 2023 Exhibit 9: Transportation Concurrency Memo, prepared by Brianne Bannwarth, dated April 28, 2023 Exhibit 10: Advisory Notes CITY OF RENTON DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT ADMINISTRATIVE REPORT & DECISION EXHIBITS Project Name: Hazen High School Portables Land Use File Number: LUA23-000127, SA-A Date of Report July 28, 2023 Staff Contact Alex Morganroth Senior Planner Project Contact/Applicant Lisa Klein, AHBL /2215 N 30th St, Tacoma , WA 98402 / klein@ahbl.com Project Location 1101 Hoquiam Ave NE (APN 1023059278) – Hazen High School DocuSign Envelope ID: CF47A1ED-D2D0-48F7-B909-4ACAFFC7A3EB