Loading...
HomeMy WebLinkAboutEx16_Hearing Examiner’s Decision for Topgolf CITY OF RENTON DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT HEARING EXAMINER DECISION ADDITIONAL EXHIBITS Project Name: Topgolf Project Number: LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD Date of Report August 13, 2019 Staff Contact Clark H. Close Project Contact/Applicant Jenelle Taflin Navix Engineering 11235 SE 6th St, Ste. 150 Bellevue, WA 98004 Project Location 745 Park Ave N, Renton WA 98057 (APN 0886610010) The following exhibits were entered into the record by Hearing Examiner: Exhibits 1-21: As shown in the Environmental Review Committee (ERC) Report Exhibits 22-30: As shown in the Staff Report to the Hearing Examiner Exhibit 31: Staff PowerPoint Exhibit 32: COR Maps, http://rp.rentonwa.gov/Html5Public/Index.html?viewer=CORMaps Exhibit 33: Google Aerial Maps, https://www.google.com/maps Exhibit 34: Applicant PowerPoint TopgolfMaster Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner Conditional Use Permit, 2 Variances and Street ModificationFile LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MODHearing Examiner Public HearingClark H. Close, Senior PlannerAugust 13, 2019 13.68-acre parcel 745 Park Ave N, Renton WA The Landing in Renton Urban Center (UC) zone Urban Design District ‘C’ Commercial & Mixed Use (CMU)Location and ZoningSITEN 8th StPark Ave N Logan Ave N 2 Site CharacteristicsSITEThe LandingSouthportBoeingBoeingBoeingLogan Ave N N 8th StN 6th St3Project ProposalPhase IPhase II4 Project ProposalLandscape PlanPlazaParkingFlexParkingPatio5Project Proposal6 Project ProposalBuilding Elevations7Project ProposalBuilding Elevations8 Variances To allow more than 60’ of street frontage parking in the front yard setback between the building and the pedestrian-oriented street.9Variances Up to 170’ high poles to support the barrier netting system around the outdoor driving range outfield.10 Street Modification Retain the existing frontage improvements along Logan Ave N, N 8th St and Park Ave N11 Requesting approval of Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner Conditional Use Permit, 2 Variances and Street Modification and Waiver of Street Improvements. The application was received on May 1, 2019 and the application was determined incomplete on May 8, 2019. On June 17, 2019, the master application was reviewed for completeness and the application was determined complete on June 18, 2019. The project complies with the 120-day review period. Staff received no public comment letters or agency comments for Topgolf. On July 22, 2019 , the ERC issued a DNS-M with 8 mitigation measures. A 14-day appeal period commenced on July 26, 2019 and ended on August 9, 2019. No appeals of the threshold determination were filed.Approvals Requested12 Design DistrictThe project site is located within Design District ‘C’. The proposal complies with the standards and guidelines of Design District ‘C’ if all recommended conditions of approval are complied with.Zoning Development Standard Compliance and ConsistencyThe proposal has demonstrated compliance with most development standards of the Urban Center (UC) zoning classification if all recommended conditions of approval are complied with.Comprehensive Plan Compliance and ConsistencyThe proposal complies with the City’s Comprehensive Plan objectives and policies if all recommended conditions of approval are complied with.Mater Plan and Site Plan ReviewThe proposal is compliant with the Master Plan and Site Plan Review requirements if all recommended conditions of approval are complied with.Analysis13Availability and Impact on Public ServicesPolice and Fire Prevention have indicated that sufficient resources exist to furnish services to the proposed development; subject to the condition that the applicant provides Code required improvements and fees.The site is served by the City of Renton sewer and water.Conditional UseThe proposal has demonstrated compliance with the Conditional Use criteria if all recommended conditions of approval are complied with.Critical Area Compliance and ConsistencyAccording to the submitted reports settlement is anticipated and a portion of the southeastern corner of the site falls within the Downtown Wellhead Protection Area Zone 2. The proposal is compliant with the Critical Area regulations if all recommended conditions of approval are complied with.Variances and Street ModificationThe proposal is compliant with the Variance and Modification criteria if all recommended conditions of approval are complied with.Analysis cont’d14 Staff recommends approval of the Topgolf application, File No. LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD, as depicted in the Overall Site Improvement Plan (Exhibit 2) and Site Improvement Plan (Exhibit 3), subject to 24 conditions of approval.Recommendation15 Renton, WASHINGTON patio RENTON, WASHINGTON PHASING Phase IIPhase I SITE PLAN Standard Stalls 167 Compact Stalls 21 ADA Stalls 9 Flex Stalls 119 Total Parking 336 Bike Parking 36 PHOTOMETRICS GAME PLAY LIGHTING PLAZA PATIO PHASE II Phase II •Greater than 20% of overall site •Enough space for multitude of uses •Compliant with CUP PARKING + SETBACK VARIANCE POLE HEIGHT VARIANCE SITE GRADING & DRAINAGE LANDSCAPING TRAFFIC SIGNALS Full Access Right-In Right-Out Signal Improvements ACCESS + OPERATION