Loading...
HomeMy WebLinkAboutEx21_Advisory NotesDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 2 LUA23-000201 ADVISORY NOTES TO APPLICANT The following notes are supplemental information provided in conjunction with the administrative land use action. Because these notes are provided as information only, they are not subject to the appeal process for the land use action. Planning: (Contact: Clark Close, 425-430-7289, cclose@rentonwa.gov) 1. RMC section 4-4-030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless otherwise approved by the Development Services Division. 2. Commercial and other nonresidential construction activities shall be restricted to the hours between seven oclock (7:00) a.m. and eight oclock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between nine oclock (9:00) a.m. and eight oclock (8:00) p.m. No work shall be permitted on Sundays. 3. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an appropriate ground cover over any portion of the site that is graded or cleared of vegetation and where no further construction work will occur within ninety (90) days. Alternative measures such as mulch, sodding, or plastic covering as specified in the current King County Surface Water Management Design Manual as adopted by the City of Renton may be proposed between the dates of November 1st and March 31st of each year. The Development Services Divisions approval of this work is required prior to final inspection and approval of the permit. 4. A National Permit Discharge Elimination System (NPDES) permit is required when more than one acre is being cleared. 5. The applicant may not fill, excavate, stack or store any equipment, dispose of any materials, supplies or fluids, operate any equipment, install impervious surfaces, or compact the earth in any way within the area defined by the drip line of any tree to be retained. 6. The applicant shall erect and maintain six foot (6’) high chain link temporary construction fencing around the drip lines of all retained trees, or along the perimeter of a stand of retained trees. Placards shall be placed on fencing every fifty feet (50’) indicating the words, NO TRESPASSING Protected Trees or on each side of the fencing if less than fifty feet (50’). Site access to individually protected trees or groups of trees shall be fenced and signed. Individual trees shall be fenced on four (4) sides. In addition, the applicant shall provide supervision whenever equipment or trucks are moving near trees. Development Engineering: (Contact: Yong Qi, 425-430-7439, yqi@rentonwa.gov) 1. See attached Development Engineering Memo dated July 10, 2023. Fire Authority: (Contact: Corey Thomas, 425-276-9582, cthomas@rentonrfa.org) 1. No comments at this time. Technical Services: (Contact: Stephanie Rary, 425-430-6592, srary@rentonwa.gov) 1. No comments at this time. Community Services: (Contact: Erica Schmitz, 425-430-6614, eschmitz@rentonwa.gov) ADVISORY NOTES TO APPLICANT Page 2 of 2 LUA23-000201 2. No comments at this time. Police: (Contact: Sandra Havlik, 425-430-7520, shavlik@rentonwa.gov) 1. No comments at this time. Building: (Contact: Rob Shuey, 425-430-7290, rshuey@rentonwa.gov) 1. Recommendations of the geotechnical report must be followed as a condition of building permits. DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE:July 10, 2023 TO:Clark Close, Principal Planner FROM:Yong Qi, Development Engineering SUBJECT:8TH Street Short Plat Preliminary Short Plat 780 Logan Ave N LUA23-000201 I have completed the review for the above-referenced proposal located at parcel 0886610010. The following comments are based on the land use application submittal made to the City of Renton by the applicant. EXISTING SITE CONDITIONS AND CODE REQUIREMENTS The project site consists of a phased development including Phase 1 (LUA19-000094) of Topgolf with surface parking stalls, Phase 2 (LUA22-000291) of a retail building, and Phase 3 (LUA23-000066) of LivAway Renton Hotel project. Please refer to those land uses for detailed utility conditions and code requirements. PRELIMINARY SHORT PLAT COMMENTS A preliminary short plat prepared by Axis Survey & Mapping, Inc., dated June 2, 2023, was submitted by the Applicant with the Land Use Application. 1. On the second page of the plat map, there is a recorded public water utility easement (recording #20220822000289) as part of Phase 1 development. The water utility easement portion on proposed LOT 2 needs to be modified, and additional public water utility easement is required for the upcoming water main extension on Phase 2 and 3 developments. 2. The existing and proposed utilities (pipes and structures of water, storm, sewer) shall be removed from the preliminary short plat.