HomeMy WebLinkAboutMFP22004763.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP22004763
IVR Number: 22004763
Permit Information
Permit Name: Comcast Cable Franchise Permit
Address/Location:09/07/2022Application Date:7224000425Parcel Number: 303 PARK AVE N
Permit Type:09/15/2022Issue Date:Franchise
Permit Work Class:09/15/2023Expiration Date:Minor Utility
Job Number: 1106005Franchise Type:Cable
Description: Comcast JB0001106005 REVISION BORE PATHED MOVED INTO STREET. SEE PLANS FOR DETAILS.
REMOVE EXISTING CONCRETE SIDEWALK PANELS, TRENCH, PLACE (1) 2" CONDUIT & PULL COAX THROUGH
SET (2) 24"x36" NEW VAULTS REMOVE EXISTING CONCRETE SIDEWALK PANELS, TRENCH, PLACE(1) 4"
CONDUIT & PULL COAX THROUGH. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON
STANDARDS.
Contacts
Name Address PhoneTypeBilling
David Standring
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
B: (253)
922-2787x286
Applicant
Corrie Lamb
Comcast
2525 Beaufort Dr.
Modesto, CA 95355
Contact
David Standring
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
B: (253)
922-2787x286
Contractor
Business License Number: 20838Construction Contractor: CANNOCL791JK
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
X
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐New Construction ☐Repair/Relocate ☐Underground ☐Overhead ☐Sidewalk ☐Street
☐Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Comcast Cable Communications Management
JB0001106005 -MFP22004763
Jessamin Santos
253-225-0596
jessamin_santos@comcast.com
315 GARDEN AVE N RENTON, WA 98057 315 GARDEN AVE N RENTON, WA 98057
- SET (1) 24"X36" NEW VAULTS. - REMOVE EXISTING CONCRETE SIDEWALK PANELS, TRENCH, PLACE (1) 2" CONDUIT & PULL COAX THROUGH.
DIRECTIONAL DRILL, PLACE (1) 4" CONDUIT & PULL COAX THROUGH.
Cannon Construction LLC - David Standring 253-922-2787
601590363 20838
07/17/2023
MFP22004673
Scott Warlick 8/2/2023 POTHOLE ALL EXISTING UTILITIES
RESTORATION PER CITY OF RENTON STANDARDS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
- SET (1) 24"X36" NEW VAULTS. - REMOVE EXISTING CONCRETE SIDEWALK PANELS, TRENCH, PLACE (1) 2"
CONDUIT & PULL COAX THROUGH. - DIRECTIONAL DRILL, PLACE (1) 4" CONDUIT & PULL COAX THROUGH.
JB0001106005 MFP22004763
315 GARDEN AVE N RENTON, WA 98057
Monday Friday 8am 3pm
Cannon Construction
Jessamin Santos 206-401-2188
410 Valley Ave NW, Suite 12, Bldg C Puyallup
Scott Warlick CED 8/2/2023
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Jessamin Santos
07/17/2023
250
326
310
247
323
1201 1207
322
301
300
1005
314
315
250
1007 1009
332
316
249
303
PARK AVE NN 3RD STN 3RD ST PARK AVE NROW ROW ROW ROW ROWROWROWROWROWROWROWROWROWROWROWROWROWEOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPS/W S/W S/W S/W S/W S/W S/W S/W S/WS/WS/WS/WS/WS/WS/WS/WS/WS/WS/WS/WS/W S/W S/W S/W S/W S/W ROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROWEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOP
EOP EOP EOP EOP EOP EOP
ROW ROW ROW ROW
ROWROWEOP EOP EOP EOP EOP EOP EOP EOP
EOPEOPEOPROWROWROW
ROWROWEOPEOPEOPEOPEOPEOPEOPEOP
EOPEOPROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW
ROWROWROWROWROWROWROWROW
ROWROWROW ROW ROW ROW
ROWROWS/WS/WS/WS/WS/WS/WS/WS/WS/WS/WXXXWTLWTPLACE
AT THE CORNER
OF PARK AVE N &
N 4TH ST
FASX
XLANDSCAPE LANDSCAPER2-1
R2-1
R2-1
315B TRAFFIC CONTROL PLAN
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
DISCLAIMER
All traffic control setups, sign spacing, and procedures will conform to the
specifications stated in the federal Manual on Uniform Traffic Control Devices
(M.U.T.C.D)
Cities and various municipalities may have also adopted specialized guidelines
for traffic control within their jurisdiction. It is the responsibility of the on-site
traffic control personnel to verify if any special conditions exist.
TRAFFIC CONTROL ADDITIONAL NOTES
- Will coordinate with any businesses that will be affected by construction
- Temporary "NO PARKING" signs to be placed at least 72 hours prior to work
- Driveway access will be maintained unless otherwise noted
- Sidewalk of 4' width will be maintained for pedestrian access unless
otherwise noted, spotter on site to escort pedestrians through work zone
- All work will stop while pedestrians are escorted through work zones
- Signs within roadway will be protected by channelization devices
- All traffic control devices used for night work must be retroreflective
FLAGGERSPOTTERLEGEND
Work Vehicle Truck Mounted Attenuator Work Area
Flagger Spotter Traffic Safety Cone/Drum
WT WT
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
/
PM CONTACT INFORMATION:
DRAWN BY:
PROJECT MANAGER:
N
S
EW
CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCChristopher White
(P): (253) 348-9733
(E): cwhite@teamcannon.comJB0001106005315 GARDEN AVE N RENTON315 GARDEN AVE N RENTON, WA 98057FORCED RELOCATE17-050
09/07/2022
C.WHITE
B.ETICHA
TRAFFIC CONTROL
1 1
WORK TYPE:UNDERGROUND WORK
MFP22004673
WORK AREA
PAGE 5
PROJECT MAP:
POLE INFORMATION:
POLE COUNT =
POLES THAT NEED PERMIT =
POLES THAT NEED MAKE READY =
TRANSMISSION =
DISTRIBUTION =
0
0
0
0
0
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
SITE ADDRESS:
315 GARDEN AVE N
RENTON, WA 98057
CONTACTS:
CANNON COMPANIES
Silas Schroeder - (253) 709-3302 - sschroeder@teamcannon.com
COMCAST COMMUNICATION
Danny Cooley - (253)-215-7020 - Danny_Cooley@comcast.com
SCOPE OF WORK:
JB0001106005
315 GARDEN AVE N RENTON
SHEET INDEX
1 -COVER
2 -GENERAL NOTES
3 -LEGEND
4 -DETAILS
5 -CONSTRUCTION PLAN
- SET (1) 24"X36" NEW VAULTS.
- REMOVE EXISTING CONCRETE SIDEWALK PANELS, TRENCH, PLACE (1) 2" CONDUIT &
PULL COAX THROUGH.
- DIRECTIONAL DRILL, PLACE (1) 4" CONDUIT & PULL COAX THROUGH.
N
S
EW
*ALL FOOTAGES AND MATERIALS ARE ESTIMATEDBILL OF MATERIALS*:
NEW AERIAL =
OVERLASH =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
RISER =
TOTAL ROW FOOTAGE =
FT.
FT.
FT.
FT.
FT.
FT.
ROW FOOTAGES*:
NEW BUILDING PATHWAY =
EXISTING BUILDING PATHWAY =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
TOTAL SITE FOOTAGE =
FT.
FT.
FT.
FT.
FT.
SITE FOOTAGES*:
TOTAL PROJECT FOOTAGE = FT.
0
0
118
0
(0)0
118
0
0
0
0
0
118
FTCOAX118
FORCED RELOCATES
MFP22004673
STANDARD
1. THE LOCATIONS OF UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. ALL UTILITY LOCATIONS SHALL BE VERIFIED PRIOR TO
CONSTRUCTION. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL MAKE EXCAVATIONS AND BORINGS AHEAD OF THE WORK, AS
NECESSARY, TO DETERMINE THE EXACT LOCATIONS OF UTILITIES AND UNDERGROUND STRUCTURES. IT IS UNDERSTOOD THAT
THERE WILL BE INTERFERING UTILITIES AND OTHER UNDERGROUND PIPES, DRAINS OR STRUCTURES ENCOUNTERED THAT ARE
NOT SHOWN OR AREAS SHOWN INCORRECTLY ON THE PLANS OR THAT HAVE NOT BEEN PREVIOUSLY DISCOVERED IN THE FIELD.
THE CONTRACTOR AGREES THIS IS A NORMAL AND USUAL OCCURRENCE IN THE CONSTRUCTION OF UNDERGROUND
IMPROVEMENTS. FURTHERMORE, CONTRACTORS UNDERSTAND AND AGREE THAT WORK IN SOME CASES PROPOSED PATH MAYBE
IN CLOSE PROXIMITY TO SAID UTILITIES AND UNDERGROUND PIPES, DRAINS AND STRUCTURES NOT SHOWN ON THE PLANS WHICH
MAY REQUIRE A CHANGE IN OPERATIONS AND MAY CAUSE SLOUGHING OF THE TRENCH, ADDITIONAL TRAFFIC CONTROL,
ADDITIONAL PAVEMENT AND BACKFILL COSTS AND TIME. THE CONTRACTOR AGREES THAT A REASONABLE NUMBER OF THESE
OCCURRENCES IS USUAL AND ORDINARY, AND ARE REFLECTED IN THE BID AND PLAN OF OPERATION. THE CONTRACTORS AGREES
TO PROVIDE FOR THESE CONFLICTS AND AGREES TO PROVIDE FOR A REASONABLE AMOUNT OF TIME FOR DESIGN CHANGES
AND/OR UTILITY RELOCATIONS DUE TO SAID CONFLICTS.
2. CALL THE UTILITIES UNDERGROUND LOCATION CENTER AT 811
3. INSPECTIONS - THE CONTRACTOR SHALL NOTIFY LOCAL JURISDICTIONS FOR REQUIRED INSPECTION SERVICES.
4. EXCESS WATER - SHOULD WATER BE ENCOUNTERED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
DEWATER, AS PER LOCAL JURISDICTIONS STANDARD SPECIFICATIONS, BEFORE CONSTRUCTION CONTINUES.
5. NO SILT LADEN WATER IS TO BE DISCHARGED FROM THE SITE WITHOUT PASSING THROUGH AN EROSION CONTROL SYSTEM.
6. THE CONTRACTOR SHALL SCHEDULE AND CONTROL HIS/HER WORK SO AS TO COMPLY WITH ALL APPLICABLE ORDINANCES TO
PREVENT ANY HAZARDS TO PUBLIC SAFETY, HEALTH AND WELFARE.
7. ALL STREETS SHALL BE KEPT FREE OF DIRT AND DEBRIS ON A CONTINUOUS BASIS.
8. AN APPROVED COPY OF THESE PLANS WILL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
9. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS OF THE JOB SITE, INCLUDING SAFETY
OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY
AND NOT BE LIMITED TO NORMAL WORKING HOURS.
10. PEDESTRIAN AND VEHICULAR ACCESS TO ADJACENT PROPERTIES SHALL BE MAINTAINED AT ALL TIMES EXCEPT WHERE PRIOR
WRITTEN APPROVAL FROM THE PROPERTY OWNER HAS BEEN OBTAINED.
11. BARRICADE OPEN DEPRESSIONS AND HOLES OCCURRING AS PART OF THIS WORK, AND POST WARNING LIGHTS ON ADJACENT
PROPERTIES WITH PUBLIC ACCESS. OPERATE WARNING LIGHTS DURING HOURS FROM DUSK TO DAWN EACH DAY AND AS
OTHERWISE REQUIRED.
12. PROTECT STRUCTURES, UTILITIES, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL
MOVEMENT, UNDERMINING WASHOUT AND OTHER HAZARDS CREATED BY OPERATIONS UNDER THIS SECTION.
TRAFFIC CONTROL
1. THE CONTRACTOR IS ADVISED THAT ALL LANE CLOSURES SHALL BE KEPT TO A MINIMUM. LOCAL JURISDICTIONS WILL APPROVE
ONLY THOSE LANE AND ROADWAY CLOSURES DETERMINED TO BE NECESSARY FOR THE CONTRACTOR TO ACCOMPLISH A
SPECIFIC TASK. NO LANE OR ROADWAY CLOSURES WILL BE PERMITTED WITHOUT PRIOR APPROVALS.
2. THE CONTRACTOR SHALL KEEP ALL TRAFFIC LANES AND SHOULDERS CLEAR OF EQUIPMENT AND MATERIALS DURING
NON-WORKING HOURS. EQUIPMENT AND MATERIALS SHALL NOT BE STORED ON THE STREETS. THE CONTRACTOR'S EMPLOYEES
AND AGENTS SHALL NOT PARK PRIVATE VEHICLES ALONG THE ROADWAY OR MEDIAN.
SITE PREPARATION
1. SOD AND LAWN TO BE REMOVED SHALL BE CUT TO A NEAT VERTICAL LINE 6" MINIMUM BEYOND THE TRENCH LINE. SOD SHALL BE
EITHER REMOVED FROM THE SITE, OR CAREFULLY STOCKPILED FOR REUSE.
2. SAW CUT PAVEMENT TO A NEAT VERTICAL LINE 8" TO 12" MINIMUM BEYOND THE TRENCH LINE. REPLACE PAVEMENT WITH LIKE
MATERIAL (I.E., ASPHALT WITH ASPHALT, CONCRETE WITH CONCRETE).
3. EXCEPT AS NOTED HEREIN, ALL MATERIAL REMOVED SHALL BE TAKEN FROM THE SITE AND DISPOSED OF BY THE CONTRACTOR.
TRENCH EXCAVATION AND BACKFILL
1. TRENCH BACKFILL - WHERE MATERIAL EXCAVATED FROM TRENCHES IS UNSUITABLE FOR BACKFILL, THE CONTRACTOR SHALL
BACKFILL WITH BANK RUN GRAVEL OR MAY ELECT TO USE CDF IN LIEU OF THE COMPACTION/PROCTOR PROCESS. STONEWAY MIX
351 IS ACCEPTABLE IN ALL LOCATIONS. QUICK SETTING MIX 1004 IS ACCEPTABLE IN NON-TRAFFIC AREAS. MIX 1121 IS TO BE USED IN
TRAFFIC-BEARING LOCATIONS.
2. COMPACTION, WHEN NECESSARY, SHALL BE PERFORMED IN ACCORDANCE WITH LOCAL JURISDICTION REQUIREMENTS.
UTILITY DUCT
1. BURIED DUCT SHALL BE SCHEDULE 80 PVC OR EQUIVALENT, UNLESS NOTED OTHERWISE. MINIMUM CONDUIT COVER SHALL BE 36"
WITH A MINIMUM SLOPE OF 1/2 % TO VAULT.
2. THOROUGHLY CLEAN CONDUIT BEFORE USING OR LAYING. DURING CONSTRUCTION AND AFTER THE DUCT LINE IS COMPLETED,
PLUG ENDS OF CONDUITS TO PREVENT WATER WASHING INTO CONDUIT OR MANHOLES, TAKE PARTICULAR CARE TO KEEP
CONDUITS CLEAR OF CONCRETE, DIRT AND ANY OTHER SUBSTANCE DURING THE COURSE OF CONSTRUCTION.
3. AFTER DUCT PLACEMENT HAS BEEN COMPLETED, PROOF AND CLEAN DEBRIS FROM EACH DUCT, ITS ENTIRE LENGTH. INSTALL PULL
ROPE AND PLACE WATERTIGHT COMPRESSION PLUGS AT BOTH ENDS. ANY CONDUITS CONTAINING FIBER CABLE WILL REQUIRE
SIMPLEX COMPRESSION PLUGS SEALING THE CONDUITS AROUND THE CABLE.
4. OUTSIDE INNERDUCT SHALL BE 1-1/4" OPTIC-GUARD NON-METALLIC FLEXIBLE, IN COLOR SUCH AS RED OR ORANGE, WITH PULL
ROPES AND PLUGS. EXPOSED INNERDUCT INSIDE OF BUILDINGS SHALL BE PLENUM-RATED.
CEMENT CONCRETE PAVEMENT
1. ALL CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED ACCORDING TO THE STANDARD
SPECIFICATIONS OF EACH JURISDICTION.
ASPHALT CONCRETE PAVEMENT
1. ALL ASPHALT CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED WITH CLASS B ASPHALT
CONCRETE ACCORDING TO THE REQUIREMENTS OF EACH JURISDICTION.
GRAVEL AREAS
1. ALL GRAVEL AREAS DAMAGED OR REMOVED BY THIS WORK SHALL BE REPLACED WITH CRUSHED SURFACING TOP COURSE IN
ACCORDANCE WITH THE REQUIREMENTS OF EACH JURISDICTION.
SITE RESTORATION
1. ALL DISTURBED OR DAMAGED AREAS SHALL BE RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED
PRIOR TO PLACEMENT OF THE CONDUIT AND STRUCTURES.
2. VEGETATION REMOVED FOR THIS WORK SHALL BE REPLACED WITH IN-KIND PLANT MATERIAL AND SHALL BE PROPERLY PLANTED
AND WATERED IN TO ENSURE ITS SURVIVAL.
3. SITE RESTORATION SHALL INCLUDE REPLACING EXISTING CABLING AND PULL ROPES IN EXISTING CONDUITS AS THEY EXISTED
PRIOR TO CONSTRUCTION.
WATER QUALITY
1. CONSTRUCTION ACTIVITIES OCCURRING ADJACENT TO STORM DRAINAGE STRUCTURES SHALL COMPLY WITH THE STATE OF
WASHINGTON'S WATER QUALITY STANDARDS
2. THE CONTRACTOR SHALL LIMIT THE USE OF PETROLEUM PRODUCTS ON THE SITE.
DIRECTIONAL BORING
1. WHEN BORING ROADWAYS, INSTALL (1) 4" SCHEDULE 40 PVC CONDUIT WITH PULL ROPES AND PLUGS.
2. PROTECT EXISTING UTILITIES -- COORDINATE WITH LOCAL JURISDICTIONS TO POTHOLE AS REQUIRED TO LOCATE EXISTING
UTILITIES.
FIRE PROTECTION
1. ALL INSTALLED BACKBOARDS SHALL BE PAINTED WITH FIRE-RESISTANT PAINT.
2. ALL FIRE SEALED DUCT ENDS AND CORES SHALL BE 2 HOUR FIRE-RATED. ALL FIRE SEAL IN EXISTING LOCATIONS SHALL BE
REPAIRED OR REPLACED UPON DUCT OR CABLE PLACEMENT.
AERIAL INSTALLATION
1. ALL AERIAL CONSTRUCTION IS TO BE PERFORMED TO INDUSTRY ACCEPTABLE STANDARDS.
2. ALL NEW AERIAL (AND EXISTING) CABLE HEIGHTS OF ATTACHMENT TO BE DOCUMENTED AT TIME OF CONSTRUCTION.
3. 6.35 MM STRAND TO BE USED WITH STANDARD 1/4" POLE LINE HARDWARE UNLESS OTHERWISE SPECIFIED. BOND STRAND TO
POWER MAIN WHERE APPLICABLE.
4. ALL ANCHORS TO BE USED WILL BE 3/4" SCREW TYPE.
5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN AND FOLLOW ALL NESC CODES ALONG WITH APPLICABLE LOCAL AND
REGIONAL GOVERNING AUTHORITIES. ANY DISCREPANCIES BETWEEN THESE AUTHORITIES AND OR THE CONSTRUCTION PERMITS
IS TO BE VALIDATED WITH THE DESIGNER OR ENGINEER PRIOR TO CONSTRUCTION.
/
DATE:
DRAWN BY:
PROJECT MANAGER:
CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0001106005315 GARDEN AVE N RENTON315 GARDEN AVE NRENTON WA 98057FORCED RELOCATE17-050
09/07/2022
C.WHITE
B.ETICHA
GENERAL NOTES
2 5
SCALE:
NO
SCALE
MFP22004673
/
DATE:
DRAWN BY:
PROJECT MANAGER:
CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0001106005315 GARDEN AVE N RENTON315 GARDEN AVE NRENTON WA 98057FORCED RELOCATE17-050
09/07/2022
C.WHITE
B.ETICHA
LEGEND
3 5
SCALE:
NO
SCALE
MARK-UP NOTATIONSSYMBOLSLINE TYPES HATCH PATTERNS
LANE LINE
CENTER LINE / STATION LINE
FOG LINE
EDGE OF PAVEMENT
RIGHT OF WAY
SIDEWALK
FENCE
GUARD RAIL
POWER
TRAFFIC SIGNAL
COMMUNICATION
TELECOMMUNICATION
SEWER MAIN
SIDE SEWER
DRAIN MAIN
DRAINAGE DITCH
GAS
OIL
STEAM
WATER
UNKNOWN UTILITY
STRAW WATTLES
TRAFFIC CONES
PROPOSED NEW CONDUIT
PROPOSED NEW STRUCTURE
PROPOSED NEW AERIAL STRAND
FL FL
EOP EOP
ROW ROW
S/W S/W
U U U U
P P
TS TS
C C
T T
S S
SS SS
D D
DD DD
G G
OIL OIL
ST ST
W W
UNK UNK
EXISTING CONDUIT/INFRASTRUCTURE
EXISTING AERIAL
UTILITY POLE (EXIST / NEW)
STREET LIGHT
CROSS WALK SIGNAL
SHRUBBERY
TREE
CATCH BASIN
CATCH BASIN W/ SOCK
MANHOLE
UTILITY VALVE
WATER METER
UTILITY RISER (EXIST / NEW)
CB
CB
V
M
CW
SL
R
FIRE HYDRANTFH
MH
17X30 VAULT
24X36 VAULT
36X48 VAULT
4X4 VAULT
25-TA VAULT
233-LA
444-LA
253-TA VAULT
35-TA VAULT
UNK VAULT (SIZE MAY VARY)
DH
TH
DOG HOUSE
TIGER HOUSE
P PEDESTAL
EXISTING SPLICE CASE
DISTANCE STATIONSTA 0+00
CONSTRUCTION NOTE CALLOUT#
DISTANCE DIMENSION
A
#
CROSS SECTION SYMBOL
CROSS SECTION NAME
CROSS SECTION PAGE
WORK BEING DONE1LOCATION
PHOTO NOTE CALLOUT
PHOTO LOCATOR/ORIENTATION
CONCRETE ASPHALT
CONCRETE PANELS
LANDSCAPE
LIMITS OF RESTORATION
#
NEW SPLICE CASE
NEW STORAGE
FOOTAGE NOTE
FOOTAGE NOTE OVER(339')
339'
MULTIPLE SHEETS CALLOUT
GRAVEL
BRICK/COBBLE
200'
PARCEL LINES
BOREPIT
BOREPIT (SIZE MAY VARY)
N
S
EW
BUILDING OUTLINE
UTILITY POTHOLE
STREET SIGN
NORTH ARROW
LANE DIRECTION INDICATOR
#
POLE ANCHOR/GUY PROPOSED
CROSSWALK
R
POLE # CALLOUT#
CAB CABINET
NEW COAX TAP
BUS STOP LOCATION
MFP22004673
BULK424C072
HDPE STRUCTURAL FOAM/CHANNELL
SHIELD COVER
CHANNELL'S BULK VAULT ASSEMBLY
ANTI-SLIP TREAD PATTERN
ON CHANNELL SHIELD COVER
INSIDE DIMENSIONS
LENGTH WIDTH DEPTH
34.75"23"24"
FEATURES:
-VAULT BODY: 24 X 36 X 24 INCHES (OPEN
FLOOR)
-HDPE BODY - CHANNELL POLYMER COVER -
LOAD RATED
TIER 22 (SNSI/SCTE 77 2010)
-1 SHIELD COVER, TIER 22, WITH SLIP RESISTANT
TREAD
-2 COVER LOCKING BOLTS, 916 STAINLESS STEEL
HEX HEAD
BOLTS 3/8-16 UNC X 3-12" THREAD BOLTS WITH
WASHERS-2 BOX SELF CENTERING STAINLESS STEEL
CORROSION
RESISTANT NUTS
-2 TEMPORARY DROP DOOTS: 2 EACH SIDE-MINIMUM OF 2 LIFTING SLOTS IN COVEREQUIPPED WITH
STAINLESS STEEL PINS (SLOTS APPROXIMATELY 34"
X 2")
-4 REINFORCED POLYMER STEP RACKS, 2 PER
SIDE
-2 LIFTING SLOTS APPROXIMATELY 34" X 4" WITHSTAINLESS
STEEL LIFTING PINS
WEIGHT & SHIPPING:
-COVER WEIGHT: 50 LBS
-BOX WEIGHT: 55 LBS
-ASSEMBLY WEIGHT: 105 LBS
-LOADED PALLET WEIGHT: 210 LBS-PER PALLET#: 2
-PALLET DIMENSIONS: 58"L X 40"W X 42"H
LOAD RATINGS:
-ANSI/SCTE 77 TIER 22
-PROOF LOAD: 33,750 LBF
C H A N N E L L
3"
35 12"
24"
24"
28 34"
40 38"
HDPE
BODY
LOGO
LOCATION
VERTICAL
RACKING
LIFT PIN FOR
HANDHOLE
COVER
CHANNELL SHIELD COVER
24x36 VAULT
STANDARD DETAIL36"CONCRETE TRENCH DETAIL
STANDARD DETAIL
8" MIN CONCRETE (MATCH
EX IF GREATER
PANEL WIDTH PER PLAN
12" MIN.12" MIN
6" MIN COMPACT
MINERAL AGGREGATE
TYPE 2
COMPACTED
BACKFILL3' MIN.24"
12"
EX CONCRETE
SURFACE
ZONE OF INFLUENCE
1
/
DATE:
DRAWN BY:
PROJECT MANAGER:
CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0001106005315 GARDEN AVE N RENTON315 GARDEN AVE NRENTON WA 98057FORCED RELOCATE17-050
09/07/2022
C.WHITE
B.ETICHA
DETAILS
4 5
SCALE:
NO
SCALE6"ASPHALT TRENCH DETAIL
STANDARD DETAIL
3" HMA (CL 1/2")
(MATCH EX IF GREATER
PATCH WIDTH PER PLAN
12" MIN.12" MIN
11" HMA
(CL 1/2 OR 1)
6" MIN COMPACT MINERAL
AGGREGATE TYPE 2
COMPACTED
BACKFILL3' MIN.24"
12"
EX ASPHALT
SURFACE
CONTRACTOR TO VERIFY
SPECIFICATION WITH CITY OF
SEATTLE
2
MFP22004673
301
315
303
N 3RD STN 3RD ST PARK AVE NROW ROW ROW ROW ROWROWROWROWROWROWROWEOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPC C C C CCCCP P PPPP PPPS/W S/W S/W S/W S/WS/WS/WS/WS/WS/WS/WS/W S/W S/W ROWROWROWROWROWROWROWROW ROW ROWEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOPROWROWROWROWROWROWROWS
SS
S
SSSSSSSSSSSDDDDDD
DD
D
DDDDD
DD
W
CC
W
W W WWWWWWWWM S/WS/WS/WS/WS CBCBD
VV
V
STREET LIGHT
STREET LIGHT
POWER
POWER
PPOWERP
P P P P
P P P PPM
POWER CBPOWER
STA 10+50
STA 11+00
STA 11+50
STA 12+00
STA 11+87
3
100'LANDSCAPE1R
1
315
1
S
SS
S
S
S
SSSSSSSSSSSSSSSSSS
DDDDD
DD
D D
DD
D
DDDDDDNEWNEW2
2
9'BOREPIT
9'BOREPIT
22'3'6'
22'3'6'
1R
2R
2R
8'
7'5'5'
8'
7'5'
5'
STA 10+87
STA 11+27
STA 11+32
3'X3' BOREPIT
3'X3' BOREPIT
D
CONSTRUCTION NOTES:
SET (1) 24"X36" NEW VAULTS.
REMOVE EXISTING CONCRETE SIDEWALK
PANELS, TRENCH, PLACE (1) 2" CONDUIT & PULL
COAX THROUGH.
DIRECTIONAL DRILL, PLACE (1) 4" CONDUIT &
PULL COAX THROUGH.
1
2
3
D
D
RESTORATION NOTES:
RESTORE CONCRETE SIDEWALK PANELS PER
CITY OF RENTON'S SPECIFICATIONS.
RESTORE ASPHALT CONCRETE ROADWAY PER
CITY OF RENTON'S SPECIFICATIONS.
1R
2R
UTILITY LOCATION DISCLAIMER
ALL LOCATIONS OF UTILITY SHOWN ARE APPROXIMATE.
LOCATIONS OF ALL UTILITIES TO BE VERIFIED PRIOR TO
CONSTRUCTION. CALL UTILITY UNDERGROUND LOCATION
CENTER AT 1-800-424-5555
/
DATE:
DRAWN BY:
PROJECT MANAGER:
CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0001106005315 GARDEN AVE N RENTON315 GARDEN AVE NRENTON WA 98057FORCED RELOCATE17/14/23move proposed path into road & change trench for drillBESS17-050
09/07/2022
C.WHITE
B.ETICHA
CONSTRUCTION PLAN
5 5
PROPOSED PATH DISCLAIMERS
1. PROPOSED PATHWAY MAY CHANGE AT TIME OF
CONSTRUCTION DUE TO UTILITY LOCATIONS AND
INSPECTOR REQUIREMENTS
2. UNKNOWN UTILITY DEPTH TO BE VERIFIED IN FIELD
DURING TIME OF CONSTRUCTION WHEN TRENCHING
DRAINAGE SYSTEM DISCLAIMER
EXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.)
SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT
THE CONSTRUCTION PROJECT. IF ANY PARTS OF THE
SYSTEM ARE IMPACTED BY CONSTRUCTION ACTIVITIES,
THEY SHALL BE RESTORED TO THE ORIGINAL CONDITIONS.
UTILITY NOTE
WHEN CROSSING EXISTING SEWER, STORM MAIN,
WATER, AND GAS UTILITIES, PROPOSED CONDUIT MUST
MAINTAIN A MINIMUM OF 12" ABOVE AND 18" BELOW
VERTICAL CLEARANCE (MEASURED FROM OUTSIDE EDGE
OUTSIDE EDGE
WHEN PARALLEL TO GAS UTILITIES PROPOSED CONDUIT
MUST MAINTAIN A MINIMUM OF 3' HORIZONTAL
CLEARANCE. WHEN PARALLEL TO ALL OTHER UTILITIES
PROPOSED CONDUIT MUST MAINTAIN A MINIMUM OF 5'
HORIZONTAL CLEARANCE.
STATION START
STATIONING STARTS AT THE INTERSECTION OF10+00
PARK AVE N & N 3RD ST
SCALE:
0 10 20
N
S
EW
POTHOLE DISCLAIMER
POTHOLING WILL BE PERFORMED IN
SOFT SURFACES WHEN APPLICABLE TO
REDUCE HARD SURFACE RESTORATION.
PATCH POTHOLE LOCATIONS PER
LOCAL JURISDICTION SPECIFICATIONS
LOCATION
MFP22004673