HomeMy WebLinkAboutA_MechanicalPermit_JavaTradingCo_20170727.v1
H:\CED\Data\Forms-Templates\Self-Help Handouts\Building\MechApp.docx 01/18/2017
1. Job Site Address:
2. Building Permit #: (Required if the work is associated with a Building Permit)
3. Value of work to be performed:
4. Description of work to be performed:
Plan Review Required*: dust collection systems, grease hoods, fume hoods, paint rooms, and rooftop HVAC greater
than 400 pounds – please provide two (2) sets of plans and one (1) set of any related calculations for Plan Review.
NOTE: No new oil heating systems shall be allowed in the Aquifer Protection Areas.
5. Tenant Name (if Commercial or Multi-Family): Suite/Room#:
6. Contact Person: Phone: Email:
(If plan review is necessary for this application, the contact person above will be contacted when the permit is ready to issue.)
7. Contractor’s Name: Phone:
Street Address: City/State: Zip:
8. State of Washington Contractor’s License # (Required):
9. Contractor’s City of Renton Business License # (Required): BL.
10. Property Owner: Phone:
Street Address: City/State: Zip:
11. Base Permit Fee: $49.50 + Itemized Fee(s) from page 2:
Technology Fee*
TOTAL FEE:
* + Add an Additional 3% Technology Surcharge to Calculated Fee
Applicant’s Signature: Date:
MECHANICAL
PERMIT
APPLICATION
COMMUNITY & ECONOMIC DEVELOPMENT
Development Services Division
1055 South Grady Way – Renton, WA 98057
425-430-7200
www.rentonwa.gov www.MyBuildingpermit.com
M17003573 / PR17-000339 RECEIVED08/01/2017kjpeterson
BUILDING DIVISION
2 01/18/2017
MECHANICAL PERMIT FEES
Base Permit Fee: $49.50
Unit Fee Schedule: (enter quantity on line below)
1.Installation, alteration, repair, addition, or relocation of each:$18.75
Heating system (furnace, heat pump, suspended heater, fireplace, wood
stove), A/C system (air conditioner, chiller) or Air-handling unit (VAV)
including ducts, vents, controls, grills and diffusors.
If you are installing or relocating ducts, vents, grills and diffusors for an
existing heating system, choose 1 unit per system.
1a. How many of these units are on the roof? _________ If any, please list the
weight of the unit/s. ________________________________________________
If any roof top unit is over 400 lbs., plan review is required. (2) Sets of plans
required.**
2.Installation or relocation of each boiler or compressor:
Single Family or Multi-Family $18.75
Commercial $66.00
3.Installation of commercial refrigeration system:$66.00
4.Each residential ventilation/exhaust fan $ 8.75
5.Each commercial ventilation/exhaust system not a portion of any heating or
air-conditioning system authorized by a permit
$18.75
6.Installation of each commercial hood served by mechanical exhaust, including
the ducts for such hood. Type I hoods will require plan review and associated
fees. (2) Sets of plans required.**
$55.00
7.Installation or relocation of each incinerator $82.50
8.Each appliance or piece of equipment regulated by this code but not classified
in any other appliance category, or for which no other fee is listed in this code.
$18.75
9.Each gas piping system:
One (1) to four (4) outlets $13.25
Additional outlets, each $2.75
REINSPECTION FEE: $100.00 PER TRIP AS DETERMINED BY INSPECTOR
Plan Review Fee**: 40% of permit fee when required by Building Official