Loading...
HomeMy WebLinkAboutA_MechanicalPermit_JavaTradingCo_20170727.v1 H:\CED\Data\Forms-Templates\Self-Help Handouts\Building\MechApp.docx 01/18/2017 1. Job Site Address: 2. Building Permit #: (Required if the work is associated with a Building Permit) 3. Value of work to be performed: 4. Description of work to be performed: Plan Review Required*: dust collection systems, grease hoods, fume hoods, paint rooms, and rooftop HVAC greater than 400 pounds – please provide two (2) sets of plans and one (1) set of any related calculations for Plan Review. NOTE: No new oil heating systems shall be allowed in the Aquifer Protection Areas. 5. Tenant Name (if Commercial or Multi-Family): Suite/Room#: 6. Contact Person: Phone: Email: (If plan review is necessary for this application, the contact person above will be contacted when the permit is ready to issue.) 7. Contractor’s Name: Phone: Street Address: City/State: Zip: 8. State of Washington Contractor’s License # (Required): 9. Contractor’s City of Renton Business License # (Required): BL. 10. Property Owner: Phone: Street Address: City/State: Zip: 11. Base Permit Fee: $49.50 + Itemized Fee(s) from page 2: Technology Fee* TOTAL FEE: * + Add an Additional 3% Technology Surcharge to Calculated Fee Applicant’s Signature: Date: MECHANICAL PERMIT APPLICATION COMMUNITY & ECONOMIC DEVELOPMENT Development Services Division 1055 South Grady Way – Renton, WA 98057 425-430-7200 www.rentonwa.gov www.MyBuildingpermit.com M17003573 / PR17-000339 RECEIVED08/01/2017kjpeterson BUILDING DIVISION 2 01/18/2017 MECHANICAL PERMIT FEES Base Permit Fee: $49.50 Unit Fee Schedule: (enter quantity on line below) 1.Installation, alteration, repair, addition, or relocation of each:$18.75 Heating system (furnace, heat pump, suspended heater, fireplace, wood stove), A/C system (air conditioner, chiller) or Air-handling unit (VAV) including ducts, vents, controls, grills and diffusors. If you are installing or relocating ducts, vents, grills and diffusors for an existing heating system, choose 1 unit per system. 1a. How many of these units are on the roof? _________ If any, please list the weight of the unit/s. ________________________________________________ If any roof top unit is over 400 lbs., plan review is required. (2) Sets of plans required.** 2.Installation or relocation of each boiler or compressor: Single Family or Multi-Family $18.75 Commercial $66.00 3.Installation of commercial refrigeration system:$66.00 4.Each residential ventilation/exhaust fan $ 8.75 5.Each commercial ventilation/exhaust system not a portion of any heating or air-conditioning system authorized by a permit $18.75 6.Installation of each commercial hood served by mechanical exhaust, including the ducts for such hood. Type I hoods will require plan review and associated fees. (2) Sets of plans required.** $55.00 7.Installation or relocation of each incinerator $82.50 8.Each appliance or piece of equipment regulated by this code but not classified in any other appliance category, or for which no other fee is listed in this code. $18.75 9.Each gas piping system: One (1) to four (4) outlets $13.25 Additional outlets, each $2.75 REINSPECTION FEE: $100.00 PER TRIP AS DETERMINED BY INSPECTOR Plan Review Fee**: 40% of permit fee when required by Building Official