Loading...
HomeMy WebLinkAbout7334.06 Letter 2023 0803 - Bldg Pads15365 N.E. 90th Street, Suite 100 • Redmond, WA 98052 • (425) 449-4704 • FAX (425) 449-4711 Earth Solutions NW LLC Geotechnical Engineering, Construction Observation/Testing and Environmental Services August 3, 2023 ES-7334.06 MainVue WA, LLC 121 – 3rd Avenue Kirkland, Washington 98033 Attention: Ryli Sprague Subject: Final Report – Building Pad Areas (Lots 1 to 8) Brennon Landing 1400 Aberdeen Avenue Northeast Renton, Washington Dear Ryli: In accordance with your request, Earth Solutions NW, LLC (ESNW) provided construction observations, compaction testing, geotechnical consulting services, erosion control observation, and stormwater testing services at the subject site. Our services included providing on-site observations and testing on a part-time basis from September 9, 2022 to June 22, 2023. During this time, our representatives visited the site to observe and test fill placed throughout the subject site, including structural fill placed at building pad areas. ESNW representatives observed building pad fill to be comprised primarily of re-distributed native sand and gravel (recessional outwash). ESNW representatives conducted field density testing in accordance with ASTM Test Designation D6938 (Nuclear Gauge Method). Representative soil samples were returned to our laboratory for analysis of the maximum dry density and optimum moisture content in accordance with ASTM D1557 (Modified Proctor). Representative field density test results during site mass grading and building pad preparation indicate adequate compaction of at least 95 percent was achieved at the tested locations of structural fill placed in lot areas. In addition, ESNW representatives observed dense and suitable soil conditions at both cut and fill lot subgrade areas when the prepared lot areas were probed with a one-half-inch- diameter steel rod (T-probe). ESNW representatives observed competent native soil or tested structural fill within pad areas to be dense and suitable for the design allowable soil bearing capacity of 2,500 psf. In this respect the prepared building pads (lot areas) are considered suitable for support of the new residential building structures. Based on our observations and testing, the earthwork construction associated with the on-site lot grading was accomplished in general accordance with the project plans and our geotechnical recommendations. MainVue WA, LLC ES-7334.06 August 3, 2023 Page 2 Earth Solutions NW, LLC We trust this letter meets your current needs. If you have any questions, please call. Sincerely, EARTH SOLUTIONS NW, LLC B. Tyler Scalise Keven D. Hoffmann, P.E. Senior Project Geologist Associate Principal Engineer cc: MainVue WA, LLC Attention: Allison Rothstein Sean Dickey Barghausen Consulting Engineers, Inc. Attention: Tom Barghausen, P.E. 08/03/2023