Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutFinal Agenda Packet
CITY OF RENTON
AGENDA - City Council Regular Meeting
7:00 PM - Monday, August 7, 2023
Council Chambers, 7th Floor, City Hall – 1055 S. Grady Way
Please note that this regular meeting of the Renton City Council is being offered as a hybrid
meeting and can be attended in person at the Council Chambers, 7th floor of City Hall, 1055 S
Grady Way, Renton, 98057 or remotely through Zoom.
For those wishing to attend by Zoom: Please (1) click this link
https://us02web.zoom.us/j/84938072917?pwd=TUNCcnppbjNjbjNRMWpZaXk2bjJnZz09 (or
copy/paste the URL into a web browser) or (2) call-in to the Zoom meeting by dialing 253-215-
8782 and entering 849 3807 2917 Passcode 156708, or (3) call 425-430-6501 by 5 p.m. on the
day of the meeting to request an invite with a link to the meeting.
Registration for Audience Comment: Registration will be open at all times, but speakers must
register by 5 p.m. on the day of a Council meeting in order to be called upon. Anyone who
registers after 5 p.m. on the day of the Council meeting will not be called upon to speak and
will be required to re-register for the next Council meeting if they wish to speak at that next
meeting.
• Request to Speak Registration Form:
o Click the link or copy/paste the following URL into your browser:
https://forms.office.com/g/bTJUj6NrEE
• You may also call 425-430-6501 or email jsubia@rentonwa.gov or
cityclerk@rentonwa.gov to register. Please provide your full name, city of residence,
email address and/or phone number, and topic in your message.
• A sign-in sheet is also available for those who attend in person.
Video on Demand: Please click the following link to stream Council meetings live as they
occur, or to select previously recorded meetings:
Renton Channel 21 Video on Demand
1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE
2. ROLL CALL
3. PROCLAMATION
a) Farmers Market Week - August 6 - 12, 2023
4. SPECIAL PRESENTATION
a) Councilmember Ryan McIrvin - Certificate of Municipal Leadership from the Association
of Washington Cities (AWC).
5. PUBLIC HEARINGS
a) 2024-2029 Six-Year Transportation Improvement Program (TIP)
b) Establishing Transportation Benefit District
6. ADMINISTRATIVE REPORT
a) Administrative Report
7. AUDIENCE COMMENTS
• All remarks must be addressed to the Council as a whole, if a response is requested
please provide your name and address, including email address, to the City Clerk to
allow for follow‐up.
• Speakers must sign-up prior to the Council meeting.
• Each speaker is allowed three minutes.
• When recognized, please state your name & city of residence for the record.
NOTICE to all participants: Pursuant to state law, RCW 42.17A.555, campaigning for any
ballot measure or candidate in City Hall and/or during any portion of the council meeting,
including the audience comment portion of the meeting, is PROHIBITED.
8. CONSENT AGENDA
The following items are distributed to Councilmembers in advance for study and review, and
the recommended actions will be accepted in a single motion. Any item may be removed for
further discussion if requested by a Councilmember.
a) Approval of Council Meeting minutes of July 17, 2023.
Council Concur
b) AB - 3392 Mayor Pavone recommends confirmation of the appointment of Gabriel Jones
to the youth position on the Renton Equity Commission, with a term expiring
12/31/2025.
Refer to Community Services Committee
c) AB - 3387 City Clerk submits the quarterly list of fully executed contracts between
4/1/2023 - 6/30/2023, and a report of agreements expiring between 7/1/2023 –
12/31/2023.
None; Information Only
d) AB - 3388 City Clerk submits the 2022 Joint Legislative Audit & Review Committee (JLARC)
report. The report summarizes the City's responsiveness to public records requests for
the period January 1, 2022 to December 31, 2022.
None; Information Only
e) AB - 3395 City Clerk reports submission of a street vacation petition, VAC-23-001,
petitioner Mark Peterson, for a portion of alleyway lying between N 31st St & N 32nd St
and Park Ave N & Burnett Ave N, and recommends adopting a resolution setting a public
on September 11, 2023 to consider the matter.
Council Concur; Set Public Hearing on 9/11/2023
f) AB - 3403 Community & Economic Development Department reports bid opening on July
24, 2023 for CAG-23-241, Downtown Core Streetscape Phase 2 - Williams Ave S project,
and recommends awarding the contract to the lowest responsive and responsible bidder,
Active Construction, Inc., in the amount of $1,109,109; and authorize an additional
budget appropriation of $646,646 offset by additional CDBG revenues in the same
amount to cover the total budget expenses.
Refer to Finance Committee
g) AB - 3393 Community & Economic Development Department recommends approval of a
contract with Fresh Family, in the amount of $216,000, to provide cleaning services that
complement city cleaning services within the Downtown Business District for a one-year
term.
Refer to Finance Committee
h) AB - 3396 Equity, Housing, and Human Services Department recommends adoption of a
resolution approving the First Amendment to the Joint Interlocal Agreement (ILA)
regarding roles and responsibilities in managing the City's annual federal Community
Development Block Grant (CDBG) funds with King County that adds fair housing and civil
rights obligations language required by the U.S. Department of Housing and Urban
Development (HUD).
Council Concur
i) AB - 3397 Equity, Housing, and Human Services Department recommends adoption of a
resolution approving the First Amendment to the HOME Investment Partnerships
Program managed by King County on behalf of the Community Development Block Grant
(CDBG) Consortium, that adds fair housing and civil rights obligations language required
by the U.S. Department of Housing and Urban Development (HUD).
Council Concur
j) AB - 3398 Equity, Housing, and Human Services Department recommends approval of
Amendment No. 2 to CAG-22-216, contractor King County as administrator for the
Community Development Block Grant (CDBG) Joint Agreement, which adds prior year
CDBG funding in the amount of $664,646 to the current $350,292 allocated for the
Streetscapes Improvements - Phase 2 project, and approval of the revised 2022 CDBG
Funding Contingency Plan. This project constructs new sidewalks, streetlights, street
trees, fenced landscape areas, litter receptacles, and repaving of street and parking areas
along Williams Ave S between S 2nd and S 3rd streets.
Refer to Finance Committee
k) AB - 3394 Parks & Recreation Department submits a fee waiver request in the amount of
$360 for an event at Ron Regis Park on August 19, 2023 hosted by the Save the Cedar
River organization; and a fee waiver request in the amount of $2,400 for an event at
Gene Coulon Memorial Beach Park on August 2, 9, 16, and 23, 2023 hosted by the
Inspired Child Community organization.
Refer to Finance Committee
l) AB - 3399 Parks & Recreation Department recommends approval of a contract with
United Way of King County to accept $9,500 in grant funds to support the 2023 Summer
Meals Program which reduces food insecurity in King County by serving over 12,000 meals
within in the Renton School District.
Refer to Finance Committee
m) AB - 3385 Parks & Recreation Department - PPNR submits CAG-22-042, Cascade Park
Playground Replacement project, contractor with Northwest Playground Equipment,
Inc., and requests acceptance of the project and authorization to release retainage in the
amount of $16,179.28 after 60 days after all state releases are obtained and all claims
against the retainage have been legally cleared.
Council Concur
n) AB - 3389 Police Department recommends approval of a Memorandum of Understanding
between the Federal Bureau of Investigations (Joint Terrorism Task Force, JTTF) and the
department for the purpose of information sharing and offering local assistance to
federal investigations within or having a nexus to the City of Renton.
Refer to Public Safety Committee
o) AB - 3390 Police Department requests authorization to hire a Police Communications and
Engagement Manager at Step E of salary grade m30.
Refer to Finance Committee
p) AB - 3402 Police Department recommends approval to execute the CR 2(A) agreement
with Yang Li and Wozheng Lei which forfeits the real property located at 16218 49th Ave
S in Tukwila, WA. The approximate market value of the property is $1.1 million. After the
property is acquired and prepared for sale, 17% of the final sale proceeds will be returned
to the Claimants and the City will keep the remaining 83%. These proceeds will be
deposited into the Police Drug Forfeiture fund.
Refer to Finance Committee
q) AB - 3405 Police Department recommends approval of the Edward Byrne Memorial
Justice Assistance Grant (JAG) agreement in order to receive up to $35,106 in
reimbursements that will assist with victim advocate overtime costs, training conference
for crimes against women, peer support training, and implementation of new software
that will enhance the ability to enter and track orders of protection.
Refer to Finance Committee
r) AB - 3401 Public Works Transportation Systems Division recommends approval to execute
Supplement No. 3 to CAG-20-083, agreement with KPG Psomas, Inc., in the amount of
$484,647, for final engineering design services for the SW 43rd St Preservation project.
Refer to Transportation (Aviation) Committee
9. UNFINISHED BUSINESS
Topics listed below were discussed in Council committees during the past week. Those topics
marked with an asterisk (*) may include legislation. Committee reports on any topics may be
held by the Chair if further review is necessary.
10. LEGISLATION
Resolutions:
a) Resolution No. 4503: Adopting 2024-2029 Six-Year Transportation Program (TIP) (See 5.a)
b) Resolution No. 4504: Setting Public Hearing for Peterson Street Vacation Petition: VAC-
23-001 (See 8.e)
c) Resolution No. 4505: Joint Interlocal Agreement Regarding the Community Development
Block Grant Program (See Item 8.h)
d) Resolution No. 4506: HOME Investment Partnerships Program Interlocal Cooperation
Agreement Amendment (See Item 8.i)
Ordinances for first reading:
e) Ordinance No. 6115: Establishing Transportation Benefit District (See 5.b)
f) Ordinance No. 6116: N 30th St Comprehensive Plan Amendment & Rezone
(Recommended for Adoption by P&D Committee on 6/12/2023)
11. NEW BUSINESS
(Includes Council Committee agenda topics; visit rentonwa.gov/cityclerk for more
information.)
12. ADJOURNMENT
COMMITTEE OF THE WHOLE MEETING AGENDA
(Preceding Council Meeting)
6:00 p.m. - 7th Floor - Council Chambers / Video Conference
Hearing assistance devices for use in the Council Chambers are available upon request to the City Clerk
CITY COUNCIL MEETINGS ARE TELEVISED LIVE ON GOVERNMENT ACCESS CHANNEL 21
To view Council Meetings online, please visit rentonwa.gov/councilmeetings
ArmondoPavoneMayorWhereas,farmersandranchersprovideAmericansaccesstohealthyfoodsproducedlocallyandregionallythroughfarmersmarkets,whichareexpandingandevolvingtoaccommodatethedemandforadiversearrayofagriculturalproducts;and‘Whereas,farmersmarketsincubatenewfarmbusinessesandyoungfarmerswithsmallbudgetstohonetheirentrepreneurialskills,developproducts,growaloyalshopperbase,andbuildexperiencetobesuccessful;andMThereas,farmersmarketsserveasvitalhubsforrediscoveringcommunity,helpingruralandurbancommunitiesreconnectwithoneanother,stimulatinglocalfarmingandDowntownbusinesses,andcreatingmoreequitableeconomicopportunities;andWhereas,farmersmarketsofferwomen,infants,children,andseniorsparticipatinginWICandSeniorFarmers’MarketNutritionProgramstheopportunitytoredeemtheirbenefitsforfreshproduce,andofferelectronicbenefitstransfertechnologyforSupplementalNutritionAssistanceProgramrecipientsinredeemingandmatchingtheirbenefits;andWhereas,farmersmarketprofessionalsworkcloselywithhealthofficialsandriskmanagerstoensuresafeshoppingexperiencesandmeetservicedemandsthatmakecommunityspacessafe,engaging,educational,andaccessibletothepublic;andMlhereas,theRentonFarmersMarketiscelebratingits22ndseason,openeachTuesdaythroughSeptemberfrom3:00to7:00p.m.inthebeautifulDowntowncoreatPiazzaandGatewayParks;Now,therefore,I,ArmondoPavone,MayoroftheCityofRenton,doherebyproclaimAugust6through12,2023tobeFARMERSMARKETWEEKintheCityofRenton,andIencourageallresidentstojoinmeinthisspecialobservance.Inwitnesswhereof,IhavehereuntosetmyhandandcausedthesealoftheCityofRentontobeaffixedthis7thdayofAugust,2023.AonMayorCitofReton,WashingtonPROCLAMATIONWV’RentonCityHaIl,7thFloor1055SouthGradyWay,Renton,WA98057.rentonwa.govAGENDA ITEM #3. a)
Councilmember Ryan McIrvin
City of Renton
Presented: June 26, 2023
AGENDA ITEM #4. a)
State law requires the preparation and annual updating of a
six-year comprehensive transportation program.
The six-year plan reflects the involvement of City Citizens and
Elected Officials, implements the City of Renton Mission Statement,
and is used to coordinate Transportation Systems projects and
programs with other jurisdictions and agencies.
The Transportation Systems Division creates and maintains an interconnected,
multimodal network so that people and goods move safely and efficiently.
2024 –2029 TRANSPORTATION IMPROVEMENT PROGRAM
DEPARTMENT OF PUBLIC WORKS
AGENDA ITEM #5. a)
The annual update of the TIP helps maintain that Transportation Capital Programming and future
Planning stays aligned with the City’s current goals and aspirations.
What’s
Happening
Now?
What
Obstacles to
Overcome?
What’s the
Next Target?
What Should
Be Happening?+=-
TRANSPORTATION
IMPROVEMENT
PROGRAMPROGRAM INPUT
Maintenance and
Operations
Walkway and Safety
Bridge and Guardrail
Project
Development/Planning
COMMUNITY PLANS
City Center Community Plan
Benson Hill Community Plan
Sunset Area Community
Investment Strategy
Downtown Civic Core
Vision and Action Plan
Renton Trails and Bicycle
Master Plan
Capital Investment
Program (CIP)
Funded Priorities
How much can
be funded?
What/Where
are the needs?
COMPREHENSIVE PLAN
Land Use Vision
How do we best plan?AGENDA ITEM #5. a)
The Transportation Systems Division creates and maintains an interconnected, multimodal network so that people and goods move safely and efficiently.
2024 -2029 TRANSPORTATION IMPROVEMENT PROGRAM
•Prioritization
•Funding Status Identifier Updated
•Adjusted Project Scopes/Funding on Existing Projects
•New Projects
•Removal of Completed Projects
•Updated Page Layout
•Added New Potential Local Funding Source –Transportation Benefit District (TBD)
What’s New?
Annual TIP Updates
AGENDA ITEM #5. a)
The Transportation Systems Division creates and maintains an interconnected, multimodal network so that people and goods move safely and efficiently.
Each program or project is assigned a category type, much like the CIP :AGENDA ITEM #5. a)
Project
Idea
Plan
Implementation
and Compliance
Operations and
Safety
Active
Transportation /
Multi-modal
Maintenance
and Preservation
The Transportation Systems Division creates and maintains an interconnected, multimodal network so that people and goods move safely and efficiently.
Since most projects or programs fall into
more than one category type, each item in
the TIP
denotes which PROJECT ASPECTS or goals
that it intends to meet. AGENDA ITEM #5. a)
Prioritization Process
Each program/project is evaluated based on how it meets the
prioritization criteria using a scoring guide of 0-5 that then
translates into a High, Medium or Low visual ranking (0 being
lowest, 5 being highest). The Safety, Financial, and Directive
criteria bands are weighted more heavily at a 1:2 ratio. The Plan
Implementation, System Integrity, and Mitigative bands are not
weighted and are scored at a straight 1:1 ratio. These scores are
then totaled and sorted to create the initial prioritized list.
The prioritization list is developed primarily for rank order in the
Transportation CIP budget documents and then adjusted for
significant changes in the mid-biennium TIP. Council and the
Mayor provide feedback and comments for final ranking.
The Transportation Systems Division creates and maintains an interconnected, multimodal network so that people and goods move safely and efficiently.AGENDA ITEM #5. a)
City-wide projects or programs not mapped.
2024-2029
TIP PROJECTS
AGENDA ITEM #5. a)
Funding Status
Each program/project has a current FUNDING
STATUS that identifies if it has funding or if it is
a “candidate” project with no determined
funding source at this time.
The Transportation Systems Division creates and maintains an interconnected, multimodal network so that people and goods move safely and efficiently.AGENDA ITEM #5. a)
The Transportation Systems Division creates and maintains an interconnected, multimodal network so that people and goods move safely and efficiently.
Expenditures and Revenues
AGENDA ITEM #5. a)
The Transportation Systems Division creates and maintains an interconnected, multimodal network so that people and goods move safely and efficiently.
New and Advanced Funding
Grady Way & Rainier Ave Intersection Improvements, TIP #23-27 (New)
This project received $750,000 in the 2023-2025 State Capital Transportation Budget to fund Planning activities needed
to determine if the current scope is the best alternative for improving access to the new South Renton Transit Center.
The project will be a coordinated effort between the City of Renton, Sound Transit and the Washington State
Department of Transportation (WSDOT).
Sunset Trail, TIP #23-16.1 (Advanced)
This project received a Congestion Mitigation and Air Quality (CMAQ) grant in the amount of $1,378,810 for Design
($960,150)/ROW ($418,660) in 2022 for FY 2025/2026. The City worked diligently to advance the Design funds so work
could begin in 2023. The Sunset Trail project will install a multi-use trail on the north side of NE Sunset Blvd from
Edmonds Ave NE to NE 10th Street. The scope of this project was previously included in the NE Sunset Blvd (SR 900)
Corridor Improvements project but was extracted in an effort to phase the project so that it became more financially
feasible for the City to complete within a reasonable timeframe. AGENDA ITEM #5. a)
The Transportation Systems Division creates and maintains an interconnected, multimodal network so that people and goods move safely and efficiently.
South 116th Sidewalk Project, TIP #23-04.1
This project will install sidewalk, curb and gutter, drainage and possible planter strip along S 116th St from SE
162nd St to SE 160th St.
Traffic Calming Program, TIP #23-07.2
The City developed a traffic calming program that targets speeding in or around residential areas. Traffic calming
devices can include raised sidewalks, speed cushions, mini-roundabouts or other treatments that actively reduce
speeding.
Maplewood Sidewalk Rehabilitation, TIP #23-10.1
This project will remove and replace curb and sidewalks in the Maplewood Glen neighborhood.
Sunset Trail, TIP #23-16.1
To address area growth, this project will improve access to transit and the non-motorized facility network by
installing a multi-use trail on the north side of NE Sunset Blvd between Edmonds Ave NE and NE 10th St, planter
between the trail and the street, street lighting, retaining walls, and ADA upgrades.
New Projects and Programs Added
AGENDA ITEM #5. a)
The Transportation Systems Division creates and maintains an interconnected, multimodal network so that people and goods move safely and efficiently.
Projects Under Construction in 2024
South 116th Sidewalk Project, TIP #23-04.1
Maplewood Sidewalk Rehabilitation, TIP #23-10.1
SW 43rd St Preservation, TIP #23-02
Park Ave North Extension, TIP #23-17
Rainier Ave Corridor Improvements –Phase 4, TIP #23-18
South 7th Street Corridor Improvements, TIP #23-23 AGENDA ITEM #5. a)
The Transportation Systems Division creates and maintains an interconnected, multimodal network so that people and goods move safely and efficiently.
Projects Completed in 2023
Bronson Way Bridge –Seismic Retrofit and Painting, TIP #22-15
AGENDA ITEM #5. a)
The Transportation Systems Division creates and maintains an interconnected, multimodal network so that people and goods move safely and efficiently.
Projects Completed/Nearing Completion in 2023
Duvall Ave NE Roadway Improvements, TIP #22-17 AGENDA ITEM #5. a)
The Transportation Systems Division creates and maintains an interconnected, multimodal network so that people and goods move safely and efficiently.
Projects Completed/Nearing Completion in 2023
Safe Routes to Transit, TIP #23-07.1 (Programmatic/Ongoing)
Improvements at SE 168th St/128th Ave SE Talbot Rd S at S 7th St AGENDA ITEM #5. a)
Recommended Action
Approve the annual updates to the 2024-2029
Transportation Improvement Program
Present the Resolution for reading and adoption
The Transportation Systems Division creates and maintains an interconnected, multimodal network so that people and goods move safely and efficiently.AGENDA ITEM #5. a)
Formation of a Transportation
Benefit District for Meeting Local
Preservation and Mobility Needs
August 7, 2023 –Public Hearing AGENDA ITEM #5. b)
Presentation Outline
•Pavement Preservation Needs
•Citywide Sidewalk Needs
•Local Funding Option –Transportation Benefit District (TBD)
•Formation of TBD Requirements
•Future Funding Options for Meeting Transportation Needs
•Next Steps
AGENDA ITEM #5. b)
City of Renton 10-year Pavement Preservation Plan
Pavement Asset
Inventory
The City has:
•320 centerline miles
•61 arterial miles
•259 non-arterial miles
•753 lane miles
Pavement Asset Replacement Value:
$1,056,000,000
City of Renton 10-year Pavement Preservation Plan AGENDA ITEM #5. b)
10-year Pavement Preservation Plan
Interactive storymap to view recommended treatments on Renton’s streets over the
next 10 years (click here)
Streets were evaluated and
rated using a standard rating
system known as the
Pavement Condition Index
(PCI):AGENDA ITEM #5. b)
City of Renton 10-year Pavement Preservation Plan
Asset Condition –Estimated Backlog
•$60 million in estimated maintenance for PCI 55-70
•$35 million in estimated maintenance for PCI 40-55
•$100 million in estimated maintenance for Local
Roadways
•Major, Minor, and Collector Roadways make up
the remaining $45 million
Estimated backlog of $145 million in roadway maintenance AGENDA ITEM #5. b)
City of Renton 10-year Pavement Preservation Plan
How will the preservation work be performed?
*includes overlays and seal projects
$600,000
City
Maintenance
Crews
$1,500,000
Annual
Overlay
Contract*
$2,100,000+
Annual
Pavement
Preservation
Additional City programs contributing to pavement:
Capital Improvement Project (Public)
Capital Improvement Project (Private)AGENDA ITEM #5. b)
Comprehensive Walkway Plan
Interactive storymap to view existing neighborhood conditions, missing sidewalk, and provide input on
pedestrian needs (click here)AGENDA ITEM #5. b)
•Any city or county may form a TBD by ordinance, following a public
hearing, if it finds that the action is in the public interest (RCW
36.73.050). The establishing ordinance must specify the boundaries
of the district -which may include all or part of the city or county
establishing the TBD -and the transportation improvements that will
be funded. The boundaries and functions of the TBD may not be
changed without further public hearings.
Transportation Benefit District (TBD) Formation
AGENDA ITEM #5. b)
New Chapter 5.27 Renton Transportation Benefit District
•Establishing of the Transportation Benefit District
•Citywide Boundary
•Governing Board
•City Council
•Powers of the District
•Authority to Raise Revenue for Transportation Purposes
•Administrative Roles
•Use of Funds
•Any Purpose Allowed by chapter 36.73 RCW
•Emphases on City’s Overlay and Walkway Program
•Dissolution of the District AGENDA ITEM #5. b)
•For TBDs that include all of the territory within the boundaries of the
jurisdiction(s) that established the TBD, the legislation authorizes the
governing board to impose 0.1% of the sales tax councilmanically
(without voter approval) up to 10 years at a time. (for Renton a 0.1%
sales would have generated $4.39 million in revenues for
transportation projects and programs in 2022.
•Increases the maximum transportation benefit district (TBD) sales tax
authority from 0.2% to 0.3% and authorizes indefinite renewals of up
to 10 years with voter approval.
New TBD legislation:Effective July 1, 2022,Sec. 406-407 of ESSB
5974
AGENDA ITEM #5. b)
TBD Funding Allocation to Transportation Needs
Based on Annual Revenue of $3.5M
•10 Year Pavement Preservation Plan -$1.5M Annually
•Walkway Plan -$2.0M Annually
Other Eligible Improvements Could be Those Identified in the City’s
Transportation Improvement Plan (TIP).AGENDA ITEM #5. b)
Next Steps –Legislative Schedule
•Establishing the Renton Transportation Benefit District (RTBD)•August 7th Public Hearing & First Reading of the Ordinance•August 14th Second & Final Reading of the Ordinance•August 17th Adopted Ordinance Summary Published in Seattle Times•August 22nd Ordinance in Effect
•City Assumption of the RTBD
•September 11th to Council & Referred to September 18th Finance Committee
•October 2nd Public Hearing & First Reading of the Ordinance Committee
•October 17th Ordinance in Effect
•Imposing a One-tenth of One-percent Sales Tax*
•November 6th to Council & Referred to November 16th Finance Committee
•December 4th Public Hearing & First Reading of the Ordinance
•December 19th Ordinance in Effect
*Sales tax collection would begin April 1, 2024 AGENDA ITEM #5. b)
Staff Recommendation
•Adopt an ordinance adding a new chapter 27, establishing the Renton
Transportation Benefit District, to Title V of the Renton Municipal
Code.AGENDA ITEM #5. b)
Public Comments & Questions
AGENDA ITEM #5. b)
Mayor’s Office
Memorandum
DATE: August 7, 2023
TO: Valerie O’Halloran, Council President
Members of Renton City Council
FROM: Armondo Pavone, Mayor
Ed VanValey, Chief Administrative Officer
SUBJECT: Administrative Report
• “Renton Roots – Farm to You” is a free food delivery program for US Service
Veterans who live at Compass Housing Alliance, a Veterans housing facility in
Renton. The program was created in 2022 by Carrie Olson, Farmers Market
Coordinator, and two of the City’s AmeriCorps VISTAs, Sophie DeWitt and Victoria
Kvitek. This program offers healthy food to folks in need, while at the same time
providing more sales opportunities for local Washington farmers.
Funds from the Veterans, Seniors, and Human Services Levy (VSHSL) grant are used
to purchase fresh produce on Market Tuesdays. The next day, participants choose
fruits and vegetables in a “farmers market” venue at the housing facility, and receive
recipe cards and helpful tips for keeping produce fresh. Cooking demonstrations are
offered by WSU’s Supplemental Nutrition Assistance Program Education (SNAP Ed)
program at the housing facility.
• For everyone’s enjoyment in and around City parks and trails, patrons are reminded
to be familiar with and follow Parks Rules and Regulations (Renton Municipal Code
2-9-8) or risk being cited by Police. Except for City-sponsored events, please note
the following:
Amplified sound, bounce houses, and alcohol are not permitted at any time.
Vehicles are to remain in designated parking areas only; driving or parking on
grass or sidewalks is prohibited.
Groups larger than 50 people require a temporary event permit.
All activities should cease when parks and trails close at sunset.
For more information contact Parks and Recreation Department at
rentonwa.gov/parks or (425) 430-6600.
• Information about preventative street maintenance, traffic impact projects, and
road closures happening this week can be found at http://rentonwa.gov/traffic. All
projects are weather permitting and unless otherwise noted, streets will always
AGENDA ITEM #6. a)
Valerie O’Halloran, Council President
Members of Renton City Council
Page 2 of 2
August 7, 2023
remain open. Preventative street maintenance, traffic impact projects, and road
closures will be at the following locations:
Monday, August 7 through Thursday, August 10, 7:00 a.m. to 4:00 p.m.
Intermittent lane closure on 156th Ave SE between NE 4th St and SE 142nd Pl for
crack sealing.
Monday, August 7 through Friday, August 11, 8:00 a.m. to 3:00 p.m.
Intermittent lane closure on NE 12th St and Jefferson Ave NE for utility
installation. Questions may be directed to Brad Stocco, 425-282-2373.
Monday, August 7 through Friday, August 11, 8:00 a.m. to 3:00 p.m.
Intermittent westbound lane closure on S. Grady Way at Williams Ave S for
construction work. Questions may be directed to Tom Main, 206-999-1833.
Monday, August 7 through Friday, August 11, 8:00 a.m. to 3:00 p.m. Road
closure on Kirkland Ave NE between NE Sunset Blvd and NE 12th St for utility
installation. Detour route will be provided. Questions may be directed to Brad
Stocco, 425-282-2373.
Monday, August 7 through Friday, August 11, 8:00 a.m. to 3:00 p.m.
Intermittent lane closure on Lincoln Ave NE at the 4100 block for construction
work. Questions may be directed to Kip Braaten, 206-503-1746.
Monday, August 7 through Friday, August 11, 8:00 a.m. to 3:00 p.m.
Intermittent lane closure on NE Sunset Blvd between Edmonds Ave NE and
Kirkland Ave NE for construction work. Questions may be directed to Brad
Stocco, 425-282-2373.
Monday, August 7 through Friday, August 11, 8:00 a.m. to 3:00 p.m.
Intermittent lane closure on Williams Avenue S at Grady Way S for construction
work. Questions may be directed to Tom Main, 206-999-1833.
Monday, August 7 through Friday, August 11, 9:00 a.m. to 3:00 p.m.
Intermittent lane closure on eastbound NE 4th St for construction work.
Questions may be directed to Kip Braaten, 206-503-1746.
Ongoing Street Closure through October 4, 2023 (City of Renton Resolution No.
4446). FULL STREET CLOSURE on Sunset Lane NE between NE 10th Street and
Harrington Place NE in support of the Solera Development Project (LUA20-
000305). Questions may be directed to Brad Stocco, 425-282-2373.
AGENDA ITEM #6. a)
July 17, 2023 REGULAR COUNCIL MEETING MINUTES
CITY OF RENTON
MINUTES - City Council Regular Meeting
7:00 PM - Monday, July 17, 2023
Council Chambers, 7th Floor, City Hall – 1055 S. Grady Way
CALL TO ORDER AND PLEDGE OF ALLEGIANCE
Mayor Pavone called the meeting of the Renton City Council to order at 7:00 PM and led the
Pledge of Allegiance.
ROLL CALL
Councilmembers Present:
Valerie O'Halloran, Council President
Ed Prince, Council Position No. 5
James Alberson, Jr., Council Position No. 1
Carmen Rivera, Council Position No. 2
Ryan McIrvin, Council Position No. 4
Ruth Pérez, Council Position No. 6
Kim-Khánh Vǎn, Council Position No. 7
Councilmembers Absent:
ADMINISTRATIVE STAFF PRESENT
Armondo Pavone, Mayor
Ed VanValey, Chief Administrative Officer
Shane Moloney, City Attorney
Jason Seth, City Clerk
Melissa McCain, Deputy City Clerk
Kari Roller, Finance Department Administrator
Vanessa Dolbee, Interim Community & Economic Development Administrator
Brianne Bannwarth, Development Engineering Director
Amanda Free, Assistant Economic Development Director
Chief Jon Schuldt, Police Department Administrator
Deputy Chief Jeff Hardin, Police Department
Attended Remotely:
Judith Subia, Council Liaison
Ellen Bradley-Mak, Human Resources / Risk Management Administrator
Kristi Rowland, Deputy Chief Administrative Officer
AGENDA ITEM #8. a)
July 17, 2023 REGULAR COUNCIL MEETING MINUTES
Martin Pastucha, Public Works Administrator
Ron Straka, Public Works Utility Systems Director
Rhemy King, Neighborhood Program Coordinator
PROCLAMATION
Disability Pride Month - July 2023: A proclamation by Mayor Pavone was read declaring July
2023 to be Disability Pride Month in the City of Renton, encouraging all residents to join in
this special observance. Kristina Brown, Director of Public Affairs for Kindering, accepted the
proclamation with appreciation.
MOVED BY O'HALLORAN, SECONDED BY PRINCE, COUNCIL CONCUR IN THE
PROCLAMATION. CARRIED.
SPECIAL PRESENTATIONS
Mayor’s Recognition of Summer Cameron: Diane Cooper, Co-President of Nelson Middle
School PTSA, introduced Summer Cameron and displayed her award-winning video to Council.
Ms. Cameron accepted a Certificate of Recognition from Mayor Pavone with appreciation.
Mayor’s Recognition of Elleanna Smith: Diane Cooper, Co-President of Nelson Middle School
PTSA, introduced Elleanna Smith and displayed her award-winning video to Council. Ms. Smith
accepted a Certificate of Recognition from Mayor Pavone with appreciation.
ADMINISTRATIVE REPORT
CAO Ed VanValey reviewed a written administrative report summarizing the City’s recent
progress towards goals and work programs adopted as part of its business plan for 2023 and
beyond. Items noted were:
• Renton River Days, our annual family festival and community celebration, returns on
July 21 - 23, 2023, with three days of family-oriented events, activities, and parade.
Please go to Rentonwa.gov/riverdays for all updated information and the event
details, locations, and schedule. This year’s theme is “Where Community Grows,”
highlighting our Parks and Recreation month. We look forward to seeing you there.
• The Parks and Recreation dept. was awarded $904,440 from King County for Henry
Moses Aquatic Center updates. Work will include stabilization of the failing perimeter
tile and the entire liner of the leisure activity pool. Additional work will enhance
circulation and access/egress at the main facility entrance by removing an unused
water feature and creating an open, inviting area for the public. The projected start
date is January 2024 with completion by the end of May 2024, prior to the 2024
HMAC season.
• The Parks and Recreation dept. was awarded a $350,000 grant from the RCO funding
board for design and construction improvements to existing tennis and pickleball
courts at Talbot Hill Reservoir Park. In addition to sport court improvements, the
project includes installation of new park amenities including a covered seating area,
water fountain, bike rack, benches, refuse containers, and paddle holders. The
existing parking lot will be renovated with seal coat, curbing, striping, and signage to
better serve park users.
• Preventative street maintenance will continue to impact traffic and result in
occasional street closures.
AGENDA ITEM #8. a)
July 17, 2023 REGULAR COUNCIL MEETING MINUTES
AUDIENCE COMMENTS
• Judith Schroeder, Renton, urged Council to pass renter protections such as the
elimination of daily late fees. She stated that the elimination of daily fees and
reduction of other fees would have a direct impact on reducing homelessness in
Renton.
• Kim Loulias, Renton, stated that he believed the development of a property in the
vicinity of N 31st St in Renton with File No. LUA23-0000181, was done without
properly notifying nearby residents.
• Gretchen Wix, Renton, questioned why comments from residents impacted by the
development on N 31st St was not considered, and why residents were not notified of
the project. She urged Council to make the developer start the process over.
• Mark Peterson, Renton, made a clarifying statement about a letter sent by the
Kennydale Neighborhood Association regarding the petition submitted to vacate
right-of-way (VAC-23-001) located in the vicinity of N 31st St and N 32nd St. He also
noted that 37 of 41 property owners affected by the development of the alleyway
had signed the petition to vacate the right-of-way.
• Bob Baker, Renton, stated that lack of parking is one of the biggest complaints of new
and old businesses in downtown Renton. He added that removing parking on Burnett
Ave S would have a negative impact on the VFW and other businesses located nearby.
• S. "Dutch" Deutschman, unincorporated King County, emphasized that removing 84
parking stalls on Burnett Ave S would create a serious economic hardship for the VFW
and Red House restaurant.
• Valentine Portolana, Renton, expressed appreciation to City officials and staff for the
neighborhood program, and shared her experience at a recent picnic held for the
South Renton neighborhood.
• Jeannie Greene-Crook, Renton, expressed opposition to the removal of parking stalls
near the VFW Hall in downtown. She stated that removing nearby parking stalls
would have a negative economic impact on the Hall because rental fees are a main
source of revenue.
• Jeffrey Berridge, Renton, expressed appreciation for recent neighborhood picnic
conducted for the South Renton neighborhood. He also thanked City officials for
providing a way for residents to express their opinions to Council.
CONSENT AGENDA
The following items are distributed to Councilmembers in advance for study and review, and the
recommended actions will be accepted in a single motion. Any item may be removed for further
discussion if requested by a Councilmember.
Approval of Council Meeting minutes of July 10, 2023.
MOVED BY O'HALLORAN, SECONDED BY PRINCE, COUNCIL CONCUR TO APPROVE
THE CONSENT AGENDA AS PRESENTED CARRIED.
AGENDA ITEM #8. a)
July 17, 2023 REGULAR COUNCIL MEETING MINUTES
UNFINISHED BUSINESS
Topics listed below were discussed in Council committees during the past week. Those topics marked
with an asterisk (*) may include legislation. Committee reports on any topics may be held by the Chair if
further review is necessary.
a) Transportation Committee: Chair McIrvin presented a report concurrence in the staff
recommendation to authorize the following two temporary total closures of Northeast
44th Street:
1. Between the night of Friday, July 28, 2023 to the morning of Monday, July 31,
2023 for the purpose of installing a fish passage culvert.
2. Between the night of Friday, September 8, 2023 to the morning of Monday,
September 11, 2023 for the purpose of reconfiguring the interchange at
Northeast 44th Street.
The Committee further recommends that the resolution regarding this item be
presented for adoption at tonight’s Council meeting.
MOVED BY MCIRVIN, SECONDED BY PÉREZ, COUNCIL CONCUR IN THE
COMMITTEE RECOMMENDATION. CARRIED.
b) Transportation Committee: Chair McIrvin presented a report recommending concurrence
The Transportation/Aviation Committee recommends concurrence in the staff
recommendation to:
1. Approve the annual updates to the 2024-2029 Six-Year Transportation
Improvement Program.
2. Conduct a public hearing to be held on August 7, 2023, as established on July 10,
2023.
3. Present the resolution for reading and adoption following the public hearing on
August 7, 2023.
MOVED BY MCIRVIN, SECONDED BY PÉREZ, COUNCIL CONCUR IN THE
COMMITTEE RECOMMENDATION. CARRIED.
c) Transportation Committee: Chair McIrvin presented a report recommending concurrence in the
staff recommendation to authorize the Mayor and City Clerk to execute the amendment
with Century West Engineering for the final design and bidding services associated with
the Taxiway Alpha Rehabilitation project, not to exceed $859,863.
MOVED BY MCIRVIN, SECONDED BY PÉREZ, COUNCIL CONCUR IN THE
COMMITTEE RECOMMENDATION. CARRIED.
AGENDA ITEM #8. a)
July 17, 2023 REGULAR COUNCIL MEETING MINUTES
d) Finance Committee: Chair Pérez presented a report recommending concurrence in the staff
recommendation to:
1. Approve the budget amendment and adopt the ordinance amending the
2023/2024 biennial budget to increase revenues by $2,328,089 for an amended
total revenues of $669,611,690 over the biennium, and increase expenditures by
$4,279,497 for an amended total expenditures of $790,796,650 over the
biennium; and amending the 2023 salary table. The Committee further
recommends that Section 6.13 of Policy & Procedure 800-07 be waived and that
the related ordinance be presented for first and second and final reading and
adopted at tonight’s Council meeting.
2. Approve and adopt the resolution amending the 2023/2024 Fee Schedule at
tonight’s Council meeting.
MOVED BY PÉREZ, SECONDED BY ALBERSON, COUNCIL CONCUR IN THE
COMMITTEE RECOMMENDATION. CARRIED.
e) Finance Committee: Chair Pérez presented a report recommending concurrence in the staff
recommendation to set August 7, 2023, as the public hearing date for establishing the Renton
Transportation Benefit District. The Committee further recommends that the ordinance adding a
new Chapter 27, establishing the Renton Transportation Benefit District, to Title V of the Renton
Municipal Code be presented for first reading after the public hearing.
MOVED BY PÉREZ, SECONDED BY ALBERSON, COUNCIL CONCUR IN THE
COMMITTEE RECOMMENDATION. CARRIED.
f) Finance Committee: Chair Pérez presented a report recommending concurrence in the staff
recommendation to award the construction contract to All Stripes, LLC in the amount of
$137,952.00, and approve a budget transfer in the amount of $192,213.00 from
unassigned fund balance in Fund 317 to cover anticipated expenditures for the
construction phase of this project.
MOVED BY PÉREZ, SECONDED BY ALBERSON, COUNCIL CONCUR IN THE
COMMITTEE RECOMMENDATION. CARRIED.
g) Finance Committee: Chair Pérez presented a report recommending concurrence in the staff
recommendation to authorize the Mayor and City Clerk to execute the agreement with
King County and The Hazardous Waste Management Program to accept $70,822.08 of
non-matching grant funds available in 2023-2024 to implement household hazardous
waste reduction, recycling, and education programs.
MOVED BY PÉREZ, SECONDED BY ALBERSON, COUNCIL CONCUR IN THE
COMMITTEE RECOMMENDATION. CARRIED.
h) Finance Committee: Chair Pérez presented a report recommending concurrence in the staff
recommendation to approve the requested fee waivers of $ 5,125.00 in temporary open space
rentals fees, use fees, and permit fees for Summer 2023 community events.
MOVED BY PÉREZ, SECONDED BY ALBERSON, COUNCIL CONCUR IN THE
COMMITTEE RECOMMENDATION. CARRIED.
AGENDA ITEM #8. a)
July 17, 2023 REGULAR COUNCIL MEETING MINUTES
LEGISLATION
Resolutions:
Resolution No. 4501: A resolution of the City of Renton, Washington, amending the
2023/2024 City of Renton Fee Schedule.
MOVED BY PÉREZ, SECONDED BY ALBERSON, COUNCIL ADOPT THE RESOLUTION
AS PRESENTED. CARRIED.
Resolution No. 4502: A resolution of the City of Renton, Washington, authorizing two
temporary full street closures of Northeast 44th Street between the I-405 Northbound and
Southbound freeway ramps.
MOVED BY MCIRVIN, SECONDED BY PÉREZ, COUNCIL ADOPT THE RESOLUTION AS
PRESENTED. CARRIED.
Ordinance for first reading and advancement to second and final reading:
Ordinance No. 6114: An ordinance was read amending the City of Renton Fiscal Years
2023/2024 Biennial Budget as adopted by Ordinance No. 6088 and amended by Ordinance
No. 6110, by Increasing the Budgeted Revenues and Expenditures by $2,328,089 and
$4,279,497 respectively, amending the 2023 Salary Table, providing for severability, and
establishing an effective date.
MOVED BY PÉREZ, SECONDED BY ALBERSON, COUNCIL ADVANCE THE
ORDINANCE FOR SECOND AND FINAL READING AT TONIGHT'S MEETING.
CARRIED.
Following first reading, it was:
MOVED BY PÉREZ, SECONDED BY ALBERSON, COUNCIL ADOPT THE ORDINANCE
AS READ. ROLL CALL: ALL AYES. CARRIED.
NEW BUSINESS
Please see the attached Council Committee Meeting Calendar.
EXECUTIVE SESSION & ADJOURNMENT
MOVED BY O'HALLORAN, SECONDED BY PRINCE, COUNCIL RECESS INTO
EXECUTIVE SESSION TO DISCUSS POTENTIAL LITIGATION PURSUANT TO RCW
42.30.110(1)(i) FOR APPROXIMATELY 20 MINUTES, WITH NO OFFICIAL ACTION TO
BE TAKEN AND THAT THE COUNCIL MEETING BE ADJOURNED WHEN THE
EXECUTIVE SESSION IS ADJOURNED. CARRIED. TIME: 8:11 P.M.
Chief VanValey announced that an additional 25 more minutes were needed to
finish the session. Executive Session was conducted, and no action was taken. The
Council meeting adjourned when the executive session adjourned. Time: 8:55 p.m.
AGENDA ITEM #8. a)
July 17, 2023 REGULAR COUNCIL MEETING MINUTES
Jason A. Seth, MMC, City Clerk
Jason Seth, Recorder
17 Jul 2023
AGENDA ITEM #8. a)
Council Committee Meeting Calendar
July 17, 2023
July 24, 2023
Monday
Council Holiday – No Meetings
July 31, 2023
Monday
5th Monday – No Meetings
August 7, 2023
Monday
CANCELED Community Services Committee, Chair Rivera
CANCELED Transportation Committee, Chair McIrvin
5:00 PM *
CANCELED *
Utilities Committee, Chair Alberson
Location: Council Conference Room/Videoconference *
1. Emerging Issues in Utilities *
• Surface Water Utility Pollutant Source Control Program *
6:00 PM Committee of the Whole, Chair O’Halloran
Location: Council Chambers/Videoconference
1. Community Survey Executive Summary
7:00 PM Council Meeting
Location: Council Chambers/Videoconference
* revised 08/03/23
AGENDA ITEM #8. a)
AB - 3392
City Council Regular Meeting - 07 Aug 2023
SUBJECT/TITLE: Appointment to Equity Commission-Gabriel Jones
RECOMMENDED ACTION: Refer to Community Services Committee
DEPARTMENT: Mayor Pavone
STAFF CONTACT: April Alexander, Executive Assistant
EXT.: x6520
FISCAL IMPACT SUMMARY:
None
SUMMARY OF ACTION:
Mayor Pavone appoints Gabriel Jones to the youth position on the Equity Commission for a term expiring
12/31/25.
EXHIBITS:
A. Recommendation Memo
B. Application
STAFF RECOMMENDATION:
Approve Mayor Pavone's appointment of Gabriel Jones to the Equity C ommission.
AGENDA ITEM #8. b)
DATE:July 19,2023
TO:Armondo Pavone,Mayor
FROM:Maryjane Van Cleave,Equity,Housing,&Human Services pg
Administrator
SUBJECT:Recommendation for New Appointments to the
Equity Commission
The Equity Commission currently has three vacant positions,one of which is the youth position
which has been vacant for 11 months.The Equity,Housing,and Human Services Department
has consistently worked with the Communications Division to advertise the regular and youth
vacancies through various forms of outreach,including providing notification to the Renton
School District and Renton Technical College.
Staff interviewed the only youth applicant July 19 and recommends your consideration to
appoint the following individual to ?ll the vacant Equity Commission youth position.
Gabriel Jones
Recommendation to Appoint
Term:Upon Approval-December 31,2025
Mr.Jones quali?es to ?ll the vacant youth position.He has worked as a special education aide
and explained several situations in which he recognizes some facilities and amenities are not
accessible to all populations.Mr.Jones has aided students as they transition out of high school
into adult life.He is interested in serving his community to work toward equality and improving
accessibility.He is a member of the LGBTcommunity and interested in dispelling
misinformation about this community.Mr.Jones displayed energy,good listening skills,and the
ability to be open-minded.He will bring experiences to the Commission that are not currently
represented such as his work with special education populations.
Thank you for considering this recommendation for appointment to the Renton Equity
Commission.If you have any questions,please contact Equity,Housing,and Human Services
at ext.6713.
Equity,
Human Departme
ntMemor
andum
cc:Ed Vanva
lev,
Chi
ef
Administ
rative
Officer
Kristi Ro
wla
nd,
Deput
y
ChiefAdministrativeOfficer
Jason Set
h,
Ci
ty
Clerk
AprilAle
xan
der,
Executi
ve
AssistanttotheMayor
Linda Mo
sch
etti
-
Ne
wi
ng,
AdministrativeAssistant
m
va
nc
|
ea
ve
@
re
nt
o
n
w
a.AGENDA ITEM #8. b)
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open
attachments unless you know the content is safe.
From:notification@civiclive.com
To:April Alexander
Subject:Application for Boards/Commissions/Committees 2023-02-02 05:13 PM(PST) Submission Notification
Date:Thursday, February 2, 2023 5:13:27 PM
Application for Boards/Commissions/Committees 2023-02-02 05:13 PM(PST) was
submitted by Guest on 2/2/2023 8:13:23 PM (GMT-08:00) Canada/Pacific
Name Value
Airport Advisory Committee*
Civil Service Commission*
Community Plan Advisory Board - Benson Hill
Community Plan Advisory Board - City Center
Equity Commission Equity Commission
Historical/Museum Board*
Housing Authority*
Human Services Advisory Committee*Human Services Advisory Committee*
Lodging Tax Advisory Committee*
Parks Commission*
Planning Commission*
Municipal Arts Commission*
River Days Advisory Board*
Senior Advisory Board*
Sister City Committee - Cuautla
Sister City Committee - Nishiwaki
Gender Mr.
Name Gabriel Jones
Address:13004 SE 151st Street, Renton, WA,
98058
Email Jgabe550@gmail.com
Phone 4078404821
AltPhone:
Resident Yes
ResidentSince June 2021
formerresidence Illinois
EducationBackground
I’m a political science student at Green
River College, after graduating high
school in 2021
I worked as a cashier and bagger at
Kroger from June of 2018-October of
2020. During that time I worked on
AGENDA ITEM #8. b)
OccupationalBackground multiple political campaigns and political
consulting jobs, and worked for Disney
for one year.
Employer:Top Golf in Renton
CommunityActivities
I have volunteered in my schools Gay,
Straight alliance, and volunteered as a
domestic violence shelter.
Reasonforapplying
I want to fight for active change. I want to
cause food in my community and help the
poor and desperate. I want equality for all,
and i want to make my town, my
community, and the world the best place
imaginable. I want to help cause active
change and this is how I believe I can do
it.
Day Meetings Day Meetings
Night Meetings Night Meetings
To view this form submission online, please follow the link below:
https://rentonwa.gov/form/one.aspx?
objectId=19322542&contextId=9212967&returnto=submissions
AGENDA ITEM #8. b)
AB - 3387
City Council Regular Meeting - 07 Aug 2023
SUBJECT/TITLE: 2nd Quarter 2023 Contract Report
RECOMMENDED ACTION: None; Information Only
DEPARTMENT: City Clerk
STAFF CONTACT: Jason Seth, City Clerk
EXT.: 6502
FISCAL IMPACT SUMMARY:
N/A
SUMMARY OF ACTION:
Fully executed in second quarter 2023 were 172 contracts & leases, 55 addenda, 33 change orders, and 45 are
highlighted as being over 10% and/or $100,000 of original amount The six -month expiration report shows 492
agreements that will expire between July 1, 2023, and December 31, 2023.
EXHIBITS:
A. Contracts fully executed (4/1/2023 - 6/30/2023)
B. Contracts expiring (7/1/2023 - 12/31/2023)
STAFF RECOMMENDATION:
None - Information Only.
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Attorney
CAG-22-245 Arete Law Group PLLC - Legal services in regards to King County Cause
No. 22-2-09015-4 KNT
$75,000 $110,000 P 7/21/2022 12/31/2024
Contractor: (005737) ARETE LAW GROUP PLLC
Number DateType DescriptionAmount
Adden #1-23 - ARETE LAW GROUP PLLC - Amending Compensation
section to increase maximum compensation amount to $110,000.00 (New
Expiration Date: 12/31/2024)
$35,000Addendum Adden #1-23 6/1/2023
1
$35,000
1
$35,000
1
$35,000
1
$35,000
Total
Addendum
TotalPayablesAttorney Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 1 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
CED
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 2 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
CED
CAG-23-037 Department of Transportation - Signage and a 'Green-Scaped' entry into
the city of Renton as a part of the I-405/NE 44th St Interchange
$0 $0 M 4/11/2023 9/30/2025
Contractor: UNKNOWN VENDOR
4/11/2023
CAG-23-104 Department of Commerce (DOC) - Grant to assist City of Renton for 2024
Growth Management Act Periodic Update Rec: $162,500.00
$162,500 $162,500 R 4/6/2023 12/31/2024
Contractor: UNKNOWN VENDOR
4/6/2023
CAG-23-142 U.S. Small Business Administration - Grant Award Number:
SBAHQ23I0017 - Project Title: Logan Place Market Rehabilitation (Rec:
$1,500,000.00)
$1,500,000 $1,500,000 R 4/19/2023 7/1/2025
Contractor: UNKNOWN VENDOR
4/19/2023
CAG-23-168 Sadhana - Art Grant funding for the 2023 Tagore Festival $1,400 $1,400 P 4/4/2023 12/31/2023
Contractor: (070103) SADHANA
Minority Owned, Women Owned
4/4/2023
CAG-23-180 Seattle Soccer, LLC - Springbrook Creek Wetland Mitigation Bank
Mitigation Credit Purchase Agreement and Acknowledgement for the
Sounders FC Center at Longacres REC: $ 247,851.56
$247,852 $247,852 R 5/11/2023 1/12/2025
Contractor: UNKNOWN VENDOR
5/11/2023
CAG-23-181 HIGHSCHOOL.GG - Lodging Tax funding for 2023 Renton City Retro event $20,000 $20,000 P 5/15/2023 12/31/2023
Contractor: (033247) HIGHSCHOOL.GG
5/15/2023
CAG-23-192 BAILE DIOR STUDIOS LLC - Lodging Tax funding for Stomp and Shake
multi-state dance competition
$6,500 $6,500 P 5/19/2023 12/31/2023
Contractor: (001430) BAILE DIOR STUDIOS LLC
Minority Owned, Disadvantaged Business, Women Owned
5/19/2023
CAG-23-201 UYET A LANDSCAPE & MAINTENANCE - Contract for installation and
maintenance of the downtown hanging flower baskets (May through
October 2023)
$42,000 $42,000 P 5/22/2023 12/31/2023
Contractor: (085151) UYETA LANDSCAPE & MAINTENANCE
Minority Owned
5/22/2023
CAG-23-202 Jeromeskee LLC dba Massive Break Challenge Breakdance League - Arts
Commission funding for Massive Breakdance Challenge
$3,400 $3,400 P 4/20/2023 12/31/2023
Contractor: (039098) JEROMESKEE LLC
Minority Owned
4/20/2023
CAG-23-206 AHBL, Inc - Consultant agrees to provide landscape architecture services
for the Renton Gateway Design Project
$46,950 $46,950 P 5/25/2023 6/15/2024
Contractor: (001129) AHBL INC
5/25/2023
CAG-23-214 COSTAR REALTY INFORMATION INC - Custom CoStar LoopLink Query
plugin subscription for WhyRenton.com
$4,740 $4,740 P 5/30/2023 5/30/2024
Contractor: (018516) COSTAR REALTY INFORMATION INC
5/30/2023
CAG-23-215 DAVID AMES dba Chrome Molly - Performance Agreement for Summer
Concert at Coulon
$750 $750 P 5/30/2023 12/31/2023
Contractor: (020171) DAVID AMES
5/30/2023
CAG-23-216 DAVID SAMEK dba THE KENNYDALES - Performance Agreement for
Summer Concert at Coulon
$1,200 $1,200 P 5/30/2023 12/31/2023
Contractor: (070400) SAMEK, DAVID
5/30/2023
CAG-23-217 RAINIER CHORALE - Arts Commission funding for Pops Concert in June $2,500 $2,500 P 5/30/2023 12/31/2023
Contractor: (065529) RAINIER CHORALE
5/30/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 3 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
CED
CAG-23-235 RENTON DOWNTOWN PARTNERSHIP - Lodging tax funding for Main
Street Money program
$75,000 $75,000 P 6/21/2023 12/31/2023
Contractor: (067104) RENTON DOWNTOWN PARTNERSHIP
6/21/2023
CAG-23-248 Stacy Jones - Agreement for Summer Concert performance on July 6 $750 $750 P 5/24/2023 7/31/2023
Contractor: (076810) STACY JONES
Women Owned
5/24/2023
BELOW CONTRACTS RECORDED FROM PREVIOUS REPORTING PERIOD
CAG-23-046 Sky Urban Empowerment and Transformation Center - (Renton King
County Black Alliance for
Equity and Justice Program) - Lodging Tax funding for black history month
and the Juneteenth Celebration organized by Sky Urban as part of the
Renton King County Black Alliance for Equity and Justice program
$10,000 $10,000 P 2/15/2023 12/31/2023
Contractor: (075258) SKY URBAN EMPOWERMENT CTR
2/15/2023
CAG-23-081 RENTON DOWNTOWN PARTNERSHIP - Art Grant for 2023 downtown
History and Art walking tour program
$2,500 $2,500 P 3/8/2023 12/31/2023
Contractor: (067104) RENTON DOWNTOWN PARTNERSHIP
3/8/2023
CAG-23-105 BERK CONSULTING INC - Provide review and evaluation of the Renton
Comprehensive Plan under GMA by December 31, 2024
$325,000 $325,000 P 3/28/2023 12/31/2024
Contractor: (009274) BERK CONSULTING INC
3/28/2023
CAG-23-112 MARSHA L ROLLINGER - Contract with artist for original utility box art $800 $800 P 3/23/2023 4/30/2023
Contractor: (047100) MARSHA L ROLLINGER
Women Owned
3/23/2023
CAG-23-113 Tommy Segundo - Art contract for original art for utility box wrap program $800 $800 P 3/30/2023 4/30/2023
Contractor: (080875) THOMAS A SEGUNDO
3/30/2023
CAG-23-114 Emily Mozzone - Art contract for original art for utility box art program $800 $800 P 3/30/2023 4/30/2023
Contractor: (023940) EMILY ANNE MOZZONE
3/30/2023
CAG-23-115 Amy Ferron - Art contract for original art for utility box wrap program $800 $800 P 3/30/2023 4/30/2023
Contractor: (004710) AMY FERRON
Women Owned
3/30/2023
CAG-23-116 Johanna Porter - Art contract for original art for utility box wrap program $800 $800 P 3/23/2023 4/30/2023
Contractor: (005728) JOHANNA H PORTER
Women Owned
3/23/2023
CAG-23-117 Look, Listen and learn TV - Art Grants funding for event for a community
event to launch children's public television program
$8,500 $8,500 P 3/30/2023 12/31/2023
Contractor: (037905) LOOK LISTEN AND LEARN TV
3/30/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 4 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
21
$555,190
21
$555,190
3
$1,910,352
3
$1,910,352
1
$0
1
$0
25
$2,465,542
25
$2,465,542
Total
New
TotalMiscellaneousReceivablesPayablesCED Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 5 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Ehhs-Admin
CAG-23-205 Health Commons Project - Agreement for Behavioral Health Referral Hub $50,000 $55,050 P 5/25/2023 9/30/2023
Contractor: (033230) HEALTH COMMONS PROJECT
Number DateType DescriptionAmount
CAG-23-257 BOUNCIN AROUND SEATOWN LLC - Agreement for inflatable bounce
house rental for a Juneteenth event.
$947 $947 P 6/28/2023 6/25/2023
Contractor: (010625) BOUNCIN AROUND SEATOWN LLC
Minority Owned, Women Owned
6/28/2023
CAG-23-261 PARTY HOPPERS SEATAC LLC - Agreement for inflatable bounce house
rental for a Neighborhood BBQ.
$621 $621 P 6/30/2023 5/20/2023
Contractor: (060579) PARTY HOPPERS SEATAC LLC
6/30/2023
3
$51,568
3
$51,568
3
$51,568
3
$51,568
Total
New
TotalPayablesEhhs-Admin Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 6 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Ehhs-Hs
CAG-22-289 King County Community Development - CDBG-CV3 Activities Grant. Term:
1/1/2022 - 4/30/2023.
$531,736 $531,736 R 9/8/2022 9/30/2023
Contractor: UNKNOWN VENDOR
Number DateType DescriptionAmount
Adden #1-23 - King County Community Development - time extension to
9/30/2023 (New Expiration Date: 09/30/2023)
$0Addendum Adden #1-23 4/30/2023
CAG-22-333 St. Vincent de Paul - Centro Rendu - CDBG-CV3 Contract for Rent
Assistance
$100,000 $100,000 P 1/1/2022 8/31/2023
Contractor: (070296) ST. VINCENT DE PAUL, ATTN: ACCTG
Number DateType DescriptionAmount
Adden #1-23 - Society of St. Vincent de Paul Seattle/King County -
Centro Rendu - Time extension (New Expiration Date: 08/31/2023)
$0Addendum Adden #1-23 4/30/2023
CAG-22-339 Domestic Abuse Women's Network (DAWN) - CDBG-CV3 Human Services
Agreement
$30,000 $30,000 P 1/1/2022 8/31/2023
Contractor: (020390) DAWN
Number DateType DescriptionAmount
Adden #1-23 - Domestic Abuse Women's Network (DAWN) - time
extension (New Expiration Date: 08/31/2023)
$0Addendum Adden #1-23 4/30/2023
CAG-22-353 King County Sexual Assault Resource Center - CDBG-CV3 Contract for
Sexual Assault services (Term: 1/1/2022 - 4/30/2023)
$45,000 $45,000 P 1/1/2022 7/31/2023
Contractor: (042170) KING CNTY SEXUAL ASSAULT
Number DateType DescriptionAmount
Adden #1-23 - King County Sexual Assault - CDBG-CV3 Time extension
(New Expiration Date: 07/31/2023)
$0Addendum Adden #1-23 6/12/2023
CAG-23-189 SOS Emergency Feeding Program of Seattle/King County - 2023-2024
Human Services Agreement - SOS Pop-up Lunch Program
$29,995 $29,995 P 4/1/2023 12/31/2024
Contractor: (023985) EMERGENCY FEEDING PROGRAM
Minority Owned
4/1/2023
CAG-23-252 Consejo Counseling & Referral Services - 2023-2024 Human Services
Agreement
$20,000 $20,000 P 6/28/2023 12/31/2024
Contractor: (018020) CONSEJO COUNSELING & REFERRAL
6/28/2023
CAG-23-253 Catholic Community Services of Western Washington - 2023-2024 Human
Services Agreement
$24,000 $24,000 P 6/28/2023 12/31/2024
Contractor: (014310) CATHOLIC COMMUNITY SERVICES
6/28/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 7 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Ehhs-Hs
BELOW CONTRACTS RECORDED FROM PREVIOUS REPORTING PERIOD
CAG-23-092 Lutheran Community Services NW - 2023-2024 Human Services
Agreement - Counseling at Refugees NW
$20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (045585) LUTHERAN COMMUNITY SERVICES N
1/1/2023
CAG-23-093 Sound Generations - 2023-2024 Human Services Agreement - Volunteer
Transportation Services (VTS)
$20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (073590) SOUND GENERATIONS
1/1/2023
CAG-23-094 Sound Generations - 2023-2024 Human Services Agreement - Community
Dining
$24,000 $24,000 P 1/1/2023 12/31/2024
Contractor: (073590) SOUND GENERATIONS
1/1/2023
CAG-23-095 KidVantage - 2023-2024 Human Services Agreement - Basic Needs for
Children
$30,000 $30,000 P 1/1/2023 12/31/2024
Contractor: (022975) KIDVANTAGE
1/1/2023
CAG-23-096 Refugee Women's Alliance (ReWA) - 2023-2024 Human Services
Agreement - Basic Needs Program
$20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (066309) REFUGEE WOMENS ALLIANCE
1/1/2023
CAG-23-097 Ukrainian Community Center - 2023-2024 Human Services Agreement -
Crisis Family Intervention (CFI)
$20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (083215) UKRAINIAN COMMUNITY CNTR OF WA
1/1/2023
CAG-23-098 Ukrainian Community Center - 2023-2024 Human Services Agreement -
Refugee Assistance Program (RAP)
$30,000 $30,000 P 1/1/2023 12/31/2024
Contractor: (083215) UKRAINIAN COMMUNITY CNTR OF WA
1/1/2023
CAG-23-101 St. Vincent de Paul Council of Seattle/King County - 2023-2024 Human
Services Agreement - St. Anthony's Conference Emergency Assistance
Program
$39,442 $39,442 P 1/1/2023 12/31/2024
Contractor: (070296) ST. VINCENT DE PAUL, ATTN: ACCTG
1/1/2023
CAG-23-102 Chinese Information and Service Agency - 2023-2024 Human Services
Agreement - South King County Family Resource Center
$20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (015422) CHINESE INFORMATION & SVC CTR
1/1/2023
CAG-23-106 Hero House NW - 2023-2024 Human Services Agreement - Supported
Employment
$20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (033883) HERO HOUSE
1/1/2023
CAG-23-109 St Stephen Housing Assoc - 2023-2024 Human Services Agreement -
SSHS Housing Stability Program
$20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (070300) ST STEPHEN HOUSING ASSOCIATION
1/1/2023
CAG-23-110 DAWN - Domestic Violence Women's Network - 2023-2024 Human
Services Agreement - Domestic Violence Emergency Shelter
$30,000 $30,000 P 1/1/2023 12/31/2024
Contractor: (020390) DAWN
1/1/2023
CAG-23-111 Aerospace Machinists Joint Training Committee - 2023-2024 Human
Services Agreement - Advanced Manufacturing Training Programs
$20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (001079) AEROSPACE MACHINIST
1/1/2023
CAG-23-118 King County Sexual Assault Resource Center - 2023-2024 Human
Services Agreement - Comprehensive Sexual Assault Advocacy Services
$187,984 $187,984 P 1/1/2023 12/31/2024
Contractor: (042170) KING CNTY SEXUAL ASSAULT
1/1/2023
CAG-23-131 Solid Ground Washington - 2023-2024 Human Services Agreement -
Housing Stability Project
$30,000 $30,000 P 1/1/2023 12/31/2024
Contractor: (075930) SOLID GROUND WA
1/1/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 8 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Ehhs-Hs
CAG-23-132 Crisis Connections - 2023-2024 Human Services Agreement - Teen Link $20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (018970) CRISIS CONNECTIONS
1/1/2023
CAG-23-133 Open Doors for Multicultural Families - 2023-2024 Human Services
Agreement - Multicultural Family Support Program
$20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (058075) OPEN DOORS FOR MULTICULTURE
1/1/2023
CAG-23-134 Big Brother Big Sisters of Puget Sound - 2023-2024 Human Services
Agreement - 2023-2024 Youth Mentoring
$20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (009650) BIG BROTHERS BIG SISTERS
1/1/2023
CAG-23-135 Institute for Family Development - 2023-2024 Human Services Agreement -
Parents and Children Together (PACT)
$123,920 $123,920 P 1/1/2023 12/31/2024
Contractor: (037556) INSTITUTE FOR FAMILY DEV
1/1/2023
CAG-23-136 Child and Youth Justice Center - 2023-2024 Human Services Agreement -
Leadership, Intervention, Change (LINC)
$20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (015184) CHILDREN & YOUTH JUSTICE CTR
1/1/2023
CAG-23-137 OneAmerica - 2023-2024 Human Services Agreement - English
Innovations
$20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (058046) ONEAMERICA
1/1/2023
CAG-23-138 Crisis Connections - 2023-2024 Human Services Agreement - Crisis Line $20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (018970) CRISIS CONNECTIONS
1/1/2023
CAG-23-152 REACH Center of Hope - 2023 Human Services Agreement - REACH Meal
Coalition
$15,000 $15,000 P 1/1/2023 12/31/2023
Contractor: (067105) RENTON ECUMENICAL ASSOCIATION
1/1/2023
CAG-23-153 Eastside Legal Assistance - 2023-2024 Human Services Agreement -
ELAP Pooled Cities General Request
$20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (022985) EASTSIDE LEGAL
1/1/2023
CAG-23-154 Communities in Schools of Renton-Tukwila - 2023-2024 Human Services
Agreement - Integrated Student Support
$20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (017602) COMMUNITIES IN SCHOOL INC
1/1/2023
CAG-23-155 Kindering Center - 2023-2024 Human Services Agreement - Families in
Transition (FIT)
$22,500 $22,500 P 1/1/2023 12/31/2024
Contractor: (041078) KINDERING CENTER
1/1/2023
CAG-23-156 Puget Sound Opportunities Industrialization Center - 2023-2024 Human
Services Agreement - Pathways to Self-Sufficiency
$20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (064537) PUGET SOUND TRAINING CENTER
1/1/2023
CAG-23-157 Northwest Education Access - 2023-2024 Human Services Agreement -
Helping Opportunity Youth (OY)
$20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (010259) NW EDUCATION ACCESS
1/1/2023
CAG-23-158 REACH Center of Hope - 2023 Human Services Agreement - Homeless
Services/Housing (HHS)
$51,630 $51,630 P 1/1/2023 12/31/2023
Contractor: (067105) RENTON ECUMENICAL ASSOCIATION
1/1/2023
CAG-23-159 WestSide Baby - 2023-2024 Human Services Agreement - Children's Basic
Needs Program
$20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (090549) WESTSIDE BABY
1/1/2023
CAG-23-160 Tenants Union of Washington - 2023-2024 Human Services Agreement -
BIPOC Tenance Empowerment
$20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (080320) TENANTS UNION OF WA
1/1/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 9 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Ehhs-Hs
CAG-23-173 Ubumwe Women Association Services - 2023-2024 Human Services
Agreement -Immigrant Single Parent Support
$20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (083210) UBUMWE WOMEN ASSOC SVCS
1/1/2023
CAG-23-177 YWCA of Seattle-King County-Snohomish County - 2023-2024 Human
Services Agreement - Emergency Shelter Program
$30,000 $30,000 P 1/1/2023 12/31/2024
Contractor: (093463) YWCA
1/1/2023
CAG-23-186 Eastside Legal Assistance - 2023-2024 Human Services Agreement -
Housing Stability
$20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (022985) EASTSIDE LEGAL
1/1/2023
CAG-23-193 BrightSpark Early Learning (formerly Child Care Resources) - 2023-2024
Human Services Agreement - Homeless Child Care Program
$20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (015193) CHILD CARE RESOURCES
1/1/2023
CAG-23-194 ANEW - 2023-2024 Human Services Agreement - Housing Stability $20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (004911) ANEW
1/1/2023
CAG-23-211 Eastside Legal Assistance - 2023-2024 Human Services Agreement -
Medical-Legal Partnership
$20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (022985) EASTSIDE LEGAL
1/1/2023
CAG-23-226 Issaquah Cultural Circle - Cultural Navigation $20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (038554) ISSAQUAH CULTURAL CIRCLE
Minority Owned, Women Owned
1/1/2023
CAG-23-232 Families of Color Seattle (FOC) - 2023-2024 Human Services Agreement -
Families of Color Services
$20,000 $20,000 P 1/1/2023 12/31/2024
Contractor: (012145) FAMILIES OF COLOR SEATTLE
Minority Owned, Disadvantaged Business, Women Owned
1/1/2023
42
$1,228,471
3
$0
45
$1,228,471
0
$0
1
$0
1
$0
42
$1,228,471
4
$0
46
$1,228,471
Total
Addendum
New
TotalReceivablesPayablesEhhs-Hs Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 10 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Es-Admin
CAG-23-129 State of Washington - Opioid Distributor Settlement Agreement $0 $0 M 4/4/2023 12/31/2040
Contractor: UNKNOWN VENDOR
4/4/2023
CAG-23-233 BOUNCIN AROUND SEATOWN LLC - Agreement for inflatable bounce
house rental for a Neighborhood BBQ.
$435 $435 P 5/18/2023 5/20/2023
Contractor: (010625) BOUNCIN AROUND SEATOWN LLC
Minority Owned, Women Owned
5/18/2023
1
$435
1
$435
1
$0
1
$0
2
$435
2
$435
Total
New
TotalMiscellaneousPayablesEs-Admin Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 11 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Es-Cc
BELOW CONTRACTS RECORDED FROM PREVIOUS REPORTING PERIOD
CAG-23-108 Olbrechts & Assoc - Hearing Examiner Services - Phil Olbrechts $200,000 $200,000 P 3/30/2023 1/1/2028
Contractor: (057800) OLBRECHTS & ASSOCIATES PLLC
3/30/2023
1
$200,000
1
$200,000
1
$200,000
1
$200,000
Total
New
TotalPayablesEs-Cc Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 12 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Es-Comm
CAG-23-122 Rhay Design - Agreement for graphic design services $20,000 $20,000 P 4/3/2023 12/31/2023
Contractor: (068179) RHAY DESIGN LLC
4/3/2023
1
$20,000
1
$20,000
1
$20,000
1
$20,000
Total
New
TotalPayablesEs-Comm Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 13 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Es-Em
CAG-23-072 WA State Military Dept - Emergency Management Division - 2022
Emergency Management Performance Grant (E23-151) -
6/12/2022-9/30/2023 ($63,547 Rev)
$63,547 $63,547 R 4/12/2023 9/30/2023
Contractor: UNKNOWN VENDOR
4/12/2023
1
$63,547
1
$63,547
1
$63,547
1
$63,547
Total
New
TotalReceivablesEs-Em Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 14 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Es-It
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 15 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Es-It
CAG-09-133 Enterprise GIS Project - ELA to provide GIS data & Information services
which allows unlimited access using existing licenses ($50,000 x 3 years)
exp: 6/25/2012
$150,000 $336,408 P 6/30/2009 7/24/2024
Contractor: (024349) ENVIRONMENTAL SYSTEMS RESEARC
Number DateType DescriptionAmount
Adden #2-23 - ENVIRONMENTAL SYSTEMS RESEARCH - Business
Analyst and ArcGIS Urban Subscriptions, 07/25/2023 - 07/24/2024 (New
Expiration Date: 07/24/2024)
$4,743Addendum Adden #2-23 5/19/2023
CAG-09-152 NEOGOV, Inc - Online application & applicant tracking software system $19,283 $171,202 P 8/19/2009 12/31/2040
Contractor: (030811) GOVERNMENTJOBS.COM INC
Number DateType DescriptionAmount
Adden #9-23 - GOVERNMENTJOBS.COM/NeoGov - Annual Renewal of
NeoGov Software, 07/01/23 - 06/30/24 (New Expiration Date:
12/31/2040)
$58,650Addendum Adden #9-23 6/12/2023
CAG-10-061 Principal Decision Systems International, Inc. - Police Timekeeping System
- telestaff software (Expires - Ongoing)
$37,440 $64,529 P 5/10/2010 12/31/2999
Contractor: (042961) KRONOS INC
Number DateType DescriptionAmount
Adden #3-23 - Kronos Inc - Annual Maintenance Renewal of UKG
TeleStaff (through 5/31/2024) (New Expiration Date: 12/31/2999)
$5,868Addendum Adden #3-23 4/19/2023
CAG-11-094 Permitting, inspection & licensing software to replace Permits Plus (current
software system) ($582,148.00 - 1st year)
$582,148 $709,495 P 5/6/2011 12/31/2999
Contractor: (023171) TYLER TECHNOLOGIES INC
Number DateType DescriptionAmount
Adden #5-23 - Tyler Technologies - Annual Maintenance Renewal of
EnerGov System (5/1/2023 - 4/30/2024) (New Expiration Date:
12/31/2999)
$41,691Addendum Adden #5-23 4/19/2023
CAG-11-176 Community Connectivity Consortium - Interlocal Agreement for Joint fiber
optic projects ($10,000 payable is to City of Kirkland - not paid through this
vendor).
$0 $15,355 M 11/3/2011 12/31/2061
Contractor: UNKNOWN VENDOR
Number DateType DescriptionAmount
Adden #8-23 - Community Connectivity Consortium - 2023 Annual
Membership Fee (New Expiration Date: 12/31/2061)
$5,355Addendum Adden #8-23 4/19/2023
CAG-15-111 Azteca Systems, Inc - Cityworks asset management work order processing
software
$180,000 $424,227 P 5/4/2015 12/31/2999
Contractor: (007045) AZTECA SYSTEMS LLC
Number DateType DescriptionAmount
Adden #3-23 - Azteca Systems LLC - Annual Maintenance Renewal of
CityWorks, 04/13/2023 - 04/12/2024 (Prevous Expiration Date:
12/31/2999)
$77,698Addendum Adden #3-23 4/13/2023
CAG-18-084 Cities Digital, Inc - Laserfiche Rio Upgrade $95,927 $405,046 P 5/15/2018 12/31/2999
Contractor: (015775) CITIES DIGITAL INC
Number DateType DescriptionAmount
Adden #8-23 - CITIES DIGITAL INC - Annual Software Maintenance
Renewal of Laserfiche (New Expiration Date: 12/31/2999)
$78,458Addendum Adden #8-23 5/23/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 16 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Es-It
CAG-21-218 AV Capture All - Subscription Agreement for two Court Judicial Recording
Application (JRA) Systems - recording and publishing (orig invoice was
paid without contract #)
$0 $25,463 P 5/1/2013 12/31/2999
Contractor: (007000) AV CAPTURE ALL INC
Number DateType DescriptionAmount
Adden #4-23 - AV CAPTURE ALL INC - Annual Maintenance Renewal of
AV Capture All, 05/01/2023 - 04/30/2024 (New Expiration Date:
12/31/2999)
$8,918Addendum Adden #4-23 4/19/2023
CAG-21-228 Advanced Technology Systems - Voyager Software License and
Subscription Agreement
$0 $1,872 P 1/1/2007 12/31/2999
Contractor: (001086) ADVANCED TECHNOLOGY SYSTEMS
Number DateType DescriptionAmount
Adden #4-23 - ADVANCED TECHNOLOGY SYSTEMS - Annual
Maintenance Renewal of Voyager FFP, 03/09/23 - 03/08/24 (New
Expiration Date: 12/31/2999)
$480Addendum Adden #4-23 6/13/2023
CAG-22-017 Midwestern Software Solutions - Cash Analysis & Transportation Data
Management System (TDMS) - $24,900 payable (not submitted through
contract system)
$0 $21,765 P 2/21/2014 3/31/2024
Contractor: (049485) MIDWESTERN SOFTWARE SOLUTION
Number DateType DescriptionAmount
Adden #4-23 - MIDWESTERN SOFTWARE SOLUTIONS - Annual
Software Maintenance Renewal of Cloud Based TCLS, 04/01/2023 -
03/31/2024 (New Expiration Date: 03/31/2024)
$7,633Addendum Adden #4-23 4/1/2023
Adden #5-23 - Midwestern Software Solutions - Annual Renewal of MS2
Systems from 07/01/23 - 06/30/24 (New Expiration Date: 03/31/2024)
$2,951Addendum Adden #5-23 4/1/2023
CAG-22-018 CDW Government - MobileIron Mobile Remote Management System
($9,485.44 payable - not submitted through contract system)
$0 $79,928 P 6/14/2016 8/8/2024
Contractor: (014396) CDW GOVERNMENT LLC
Number DateType DescriptionAmount
Adden #3-23 - CDW GOVERNMENT LLC - Annual Renewal of
MobileIron Mobile Remote Management System, 08/09/23 - 08/08/24
(New Expiration Date: 08/08/2024)
$29,287Addendum Adden #4-23 6/13/2023
CAG-22-173 Club Prophet Systems - Pro Shop Keeper Point of Sale license and support
agreement.
$6,056 $12,155 P 5/23/2022 2/29/2024
Contractor: (063698) CLUB PROPHET SYSTEMS
Number DateType DescriptionAmount
Adden #1-23 - CLUB PROPHET SYSTEMS - Annual software renewal of
Club Prophet Systems and Pro Shop Keeper, 03/01/23 - 02/29/24 (New
Expiration Date: 02/29/2024)
$6,078Addendum Adden #1-23 5/30/2023
CAG-22-202 DHI Water & Environment Inc - Annual maintenance renewal for MIKE+
hydraulic modeling software 7/1/2022 - 7/1/2023
$9,911 $21,049 P 6/9/2022 7/1/2024
Contractor: (020997) DHI WATER & ENVIRONMENT INC
Number DateType DescriptionAmount
Adden #1-23 - DHI WATER & ENVIRONMENT INC - Annual
Maintenance Renewal of MIKE+ Hydraulic and Modeling Software (New
Expiration Date: 07/01/2024)
$11,138Addendum Adden #1-23 5/19/2023
CAG-22-348 G12 Communications - SIP line for phones (original contract not processed
through Clerk's Office)
$0 $22,700 P 3/25/2020 12/31/2023
Contractor: (068268) G12 COMMUNICATIONS LLC
Number DateType DescriptionAmount
Adden #3-23 - G12 COMMUNICATIONS LLC - Addition of funds for
processing SIP telephone service monthly invoices (New Expiration Date:
12/31/2023)
$15,000Addendum Adden #3-23 5/2/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 17 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Es-It
CAG-22-364 PageFreezer Software Inc - Social Media archiving for city NextDoor
account (no vendor set-up - payment will be made through credit card
account).
$1,320 $1,981 M 10/31/2022 4/30/2024
Contractor: UNKNOWN VENDOR
Number DateType DescriptionAmount
Adden #1-23 - Additional NextDoor Social Media Site for Police (amount
paid via credit card, not through A/P - Canadian company) (New
Expiration Date: 04/30/2024)
$661Addendum Adden #1-23 5/4/2023
CAG-23-016 CDW GOVERNMENT LLC - Annual renewal of CrowdStrike Falcon
Complete, 01/29/2023 - 01/28/2024
$91,274 $111,226 P 1/19/2023 1/28/2024
Contractor: (014396) CDW GOVERNMENT LLC
Number DateType DescriptionAmount
Adden #1-23 - CDW Government, LLC. - Addition of Identity Threat
Protection (ITP) to our current CrowdStrike Falcon Complete platform.
(New Expiration Date: 01/28/2024)
$19,952Addendum Adden #1-23 6/21/2023
CAG-23-033 IVOXY CONSULTING INC - HCI Deployment Services $8,276 $8,276 P 2/2/2023 12/31/2023
Contractor: (038692) IVOXY CONSULTING INC
Number DateType DescriptionAmount
Adden #1-23 - IVOXY CONSULTING INC - Expiration date extension
(New Expiration Date: 12/31/2023)
$0Addendum Adden #1-23 6/13/2023
CAG-23-050 RIGHT SYSTEM INC - A virtual replacement to our current hardware Kemp
load balancer, along with software and licensing.
$18,360 $18,360 P 2/16/2023 1/26/2029
Contractor: (068463) RIGHT SYSTEM INC
Number DateType DescriptionAmount
Adden #1-23 - RIGHT SYSTEM INC - Authorization for Progress
Software Corporation to assist in the configuration of the Kemp load
balancers. (New Expiration Date: 01/26/2029)
$0Addendum Adden #1-23 4/11/2023
CAG-23-083 Savance - Annual Renewal of Savance EIOBoard, 05/07/2023 -
05/07/2024
$750 $750 P 5/7/2023 5/7/2024
Contractor: (070780) SAVANCE LLC
5/7/2023
CAG-23-147 AXON ENTERPRISE INC - Annual Renewal of Axon Input Ace, 10/01/2022
- 09/30/2023
$0 $0 P 4/21/2023 9/30/2023
Contractor: (080094) AXON ENTERPRISE INC
4/21/2023
CAG-23-148 PCS MOBILE - Annual Software Maintenance Renewal of Route1 $10,600 $10,600 P 4/24/2023 4/30/2024
Contractor: (060719) PCS MOBILE
Women Owned
4/24/2023
CAG-23-162 CARAHSOFT TECHNOLOGY CORP - Purchase of Cellebrite Premium $12,001 $12,001 P 5/1/2023 2/22/2024
Contractor: (013578) CARAHSOFT TECHNOLOGY CORP
5/1/2023
CAG-23-187 METRO/KING COUNTY FINANCE - Net Services (3-year term through
5/17/2026, then auto-renewal yearly)
$48,678 $48,678 P 5/17/2023 12/31/2999
Contractor: (041608) KING CNTY FINANCE
5/17/2023
CAG-23-191 ZOHO CORPORATION - Subscription to the ManageEngine ServiceDesk
Plus Platform
$47,857 $47,857 P 5/17/2023 12/31/2999
Contractor: (093556) ZOHO CORPORATION
5/17/2023
CAG-23-195 CASTUS CORPORATION - Annual Maintenance Renewal of Castus C4 $1,200 $1,200 P 5/19/2023 12/31/2999
Contractor: (014321) CASTUS CORPORATION
5/19/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 18 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Es-It
CAG-23-196 ZONES INC - Annual Support Renewal of Cisco Smartnet $4,066 $4,066 P 5/19/2023 12/31/2999
Contractor: (093554) ZONES, LLC
5/19/2023
CAG-23-197 QBSI - XEROX - Multifunction Printer Agreement $49,000 $49,000 P 5/19/2023 12/31/2999
Contractor: (065100) QBSI - XEROX
5/19/2023
CAG-23-198 ENTRANCE CONTROLS - Annual Renewal of Lenel SSA Software $2,619 $2,619 P 5/19/2023 7/15/2024
Contractor: (043705) ENTRANCE CONTROLS
5/19/2023
CAG-23-199 RIGHT SYSTEM INC - Edge Router Replacement Services $11,000 $11,000 P 5/19/2023 9/1/2023
Contractor: (068463) RIGHT SYSTEM INC
5/19/2023
CAG-23-209 CI SECURITY - NDA with Critical Insight $0 $0 M 4/20/2023 4/20/2026
Contractor: UNKNOWN VENDOR
4/20/2023
CAG-23-227 KNOWBE4 INC - Annual Renewal of KnowBe4 Security Awareness
Training, 07/31/23 - 07/30/24
$11,812 $11,812 P 6/13/2023 7/31/2024
Contractor: (042590) KNOWBE4 INC
6/13/2023
CAG-23-228 SOFTWARE TOOLBOX INC - Annual Maintenance Renewal of TOP
Server, 08/20/23 - 08/20/24
$491 $491 P 6/13/2023 8/20/2024
Contractor: (075950) SOFTWARE TOOLBOX INC
6/13/2023
CAG-23-239 CUBIC ITS, INC - Upgrade and Renewal of Synchro $8,662 $8,662 P 6/13/2023 6/6/2026
Contractor: (031649) CUBIC ITS, INC
6/13/2023
CAG-23-245 CDW GOVERNMENT INC - Annual Renewal of Adobe Subscriptions,
06/13/23 - 06/12/24
$37,430 $37,430 P 6/20/2023 6/12/2024
Contractor: (014396) CDW GOVERNMENT LLC
6/20/2023
CAG-23-246 AINSWORTH INC - Annual Software License Renewal of EnteliWEB,
04/01/23 - 03/31/24
$1,723 $1,723 P 6/23/2023 6/12/2024
Contractor: (001151) AINSWORTH INC
6/23/2023
16
$247,887
17
$368,544
33
$616,431
1
$0
2
$6,016
3
$6,016
17
$247,887
19
$374,560
36
$622,447
Total
Addendum
New
TotalMiscellaneousPayablesEs-It Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 19 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Es-Od
CAG-22-266 Eric Stewart (Energized Ideas) - AGREEMENT FOR TRAINING
SERVICES
$12,000 $28,000 P 8/11/2022 6/1/2023
Contractor: (024156) ENERGIZED IDEAS EDUCATION LLC
Number DateType DescriptionAmount
Adden #2-23 - ENERGIZED IDEAS EDUCATION LLC - Training, Lean
Belt, Project Management (New Expiration Date: 06/01/2024)
$12,000Addendum Adden #2-23 5/22/2023
CAG-22-420 COMENGAGE LLC - Providing services for City-Wide Community Survey
in 2023
$60,000 $70,000 P 1/3/2023 12/31/2023
Contractor: (016224) COMENGAGE LLC
Women Owned
Number DateType DescriptionAmount
Adden #1-23 - COMENGAGE LLC - Adding additional translation
languages for Community Survey; adding business survey (New
Expiration Date: 12/31/2023)
$10,000Addendum Adden #1-23 6/2/2023
CAG-23-203 Campbell Consulting - Emotional Intelligence, Quarterly Leadership
Meeting
$8,000 $8,000 P 5/22/2023 6/30/2023
Contractor: (052620) NANCY CAMPBELL
5/22/2023
1
$8,000
2
$22,000
3
$30,000
1
$8,000
2
$22,000
3
$30,000
Total
Addendum
New
TotalPayablesEs-Od Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 20 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Finance
CAG-18-142 Retail Lockbox, Inc, - Wholesale lockbox services for tax and license filings
(auto-renewal, no expiration date).
$90,000 $201,850 P 7/12/2018 12/31/2999
Contractor: (068072) RETAIL LOCKBOX INC
Number DateType DescriptionAmount
Adden #3-23 - Retail Lockbox Inc - Additional Compensation (New
Expiration Date: 12/31/2999)
$76,000Addendum Adden #3-23 5/16/2023
CAG-19-200 Pacifica Law Group LLC - Bond Counsel Services $95,000 $95,000 P 4/15/2019 4/15/2027
Contractor: (059960) PACIFICA LAW GROUP LLP
Number DateType DescriptionAmount
Adden #1-23 - PACIFICA LAW GROUP LLP - Time extension (New
Expiration Date: 04/15/2027)
$0Addendum Adden #1-23 4/20/2023
CAG-23-259 KING COUNTY - Regional agreement for Renton to join the King County
Opioid Abatement Council where they will handle the administrative and
reporting tasks for use of opioid
$0 $0 M 6/29/2023 12/31/2039
Contractor: UNKNOWN VENDOR
6/29/2023
0
$0
2
$76,000
2
$76,000
1
$0
0
$0
1
$0
1
$0
2
$76,000
3
$76,000
Total
Addendum
New
TotalMiscellaneousPayablesFinance Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 21 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Judicial
CAG-23-223 Ideal Options PLLC - SUBSTANCE USE DISORDER (SUD)
EVALUATIONS AND CARE NAVIGATION FOR IN-CUSTODY AND
OUT-OF-CUSTODY DEFENDANTS OF THE MUNICIPAL COURT
$20,000 $20,000 P 6/5/2023 2/28/2024
Contractor: (035550) IDEAL OPTION PLLC
6/5/2023
1
$20,000
1
$20,000
1
$20,000
1
$20,000
Total
New
TotalPayablesJudicial Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 22 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Police
CAG-22-313 Cost Reimbursement Agreement - 2022 - 2023 Registered Sex Offender
Grant (REV: $ 15,410.95 )
$15,411 $20,411 R 9/21/2022 6/30/2023
Contractor: UNKNOWN VENDOR
Number DateType DescriptionAmount
Adden #1-23 - King County Sheriff's Office - Granted an additional $5000
for cost reimbursement. (New Expiration Date: 06/30/2023)
$5,000Addendum Adden #1-23 6/2/2023
CAG-23-161 OCDETF SLOT Agreement - State and Local overtime and authorized
expense/strategic initiative. Investigators anticipate that his investigation
will last for the duration of FY 2023. Rec $20,000
$20,000 $20,000 R 5/3/2023 9/30/2023
Contractor: UNKNOWN VENDOR
5/3/2023
CAG-23-212 Washington Traffic Safety commission - 2023-AG-4859- King County
Distracted Driving Campaign (REC: $2,500.00)
$2,500 $2,500 R 6/2/2023 9/30/2023
Contractor: UNKNOWN VENDOR
6/2/2023
CAG-23-225 Regional Motorcade - allow the mentioned vehicles to provide traffic control
for funeral processions in accordance with WAC 308-330-466 using lights
and sirens to alert the public of our approach, presence and intent to clear
the route of the funeral procession in the City of Renton.
$0 $0 M 4/20/2023 9/14/2024
Contractor: UNKNOWN VENDOR
4/20/2023
BELOW CONTRACTS RECORDED FROM PREVIOUS REPORTING PERIOD
CAG-22-170 Kenyon Disend, PLLC - Provide legal services to COR to prosecute the
seizure and intended forfeiture of property claimed by Lei and Li
$35,000 $70,000 P 4/7/2022 12/31/2023
Contractor: (040841) KENYON DISEND, PLLC
Number DateType DescriptionAmount
Adden #1-23 - Kenyon Disend, PLLC. - Amending contract with a time
extension (New Expiration Date: 12/31/2023)
$35,000Addendum Adden #1-23 3/10/2023
CAG-22-313 Cost Reimbursement Agreement - 2022 - 2023 Registered Sex Offender
Grant (REV: $ 15,410.95 )
$15,411 $20,411 R 9/21/2022 6/30/2023
Contractor: UNKNOWN VENDOR
Number DateType DescriptionAmount
CAG-22-416 Matthew Traino - Private - Lateral Police Officer $0 $0 M 12/20/2022 12/31/2999
Contractor: UNKNOWN VENDOR
12/20/2022
CAG-23-047 Community Animal Resourse & Education Society (CARES) - Provide
Animal Shelter Space & related services not to exceed $75,000.00
$75,000 $75,000 P 2/7/2023 12/31/2024
Contractor: (013753) CARES
2/7/2023
CAG-23-059 City of Seattle - FY2022 Edward Byrne Memorial Justice Assistance Grant
(JAG Grant). Rec: $33,543.00
$33,543 $33,543 R 3/7/2023 9/30/2025
Contractor: UNKNOWN VENDOR
3/7/2023
1
$75,000
1
$35,000
2
$110,000
4
$71,454
1
$5,000
5
$76,454
2
$0
0
$0
2
$0
7
$146,454
2
$40,000
9
$186,454
Total
Addendum
New
TotalMiscellaneousReceivablesPayablesPolice Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 23 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Pr-Golf
CAG-23-242 ALL STRIPES LLC - Maplewood Golf Course (MWGC) Red Line &
Handicap Striping
$5,455 $5,455 P 6/21/2023 9/30/2023
Contractor: (001992) ALL STRIPES LLC
6/21/2023
1
$5,455
1
$5,455
1
$5,455
1
$5,455
Total
New
TotalPayablesPr-Golf Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 24 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Pr-Parks
CAG-22-013 Terra Dynamics, Inc. - Kiwanis Park Improvements $4,780,000 $5,336,213 P 4/14/2022 7/31/2023
Contractor: (080368) TERRA DYNAMICS
Number DateType DescriptionAmount
CO #5-23 - TERRA DYNAMICS - Includes COP #20 thru COP #25 - see
attached Contract Change Order Agreement dated 5/19/2023 for details.
Extension of Contract Time to July 31, 2023. (New Expiration Date:
07/31/2023)
$14,818Change CO #5-23 5/24/2023
CAG-22-015 Active Construction Inc.- Philip Arnold Park Site Improvements $4,711,486 $4,891,692 P 7/13/2022 7/31/2023
Contractor: (000767) ACTIVE CONSTRUCTION INC
Number DateType DescriptionAmount
CO #5-23 - ACTIVE CONSTRUCTION INC - Change Order for RPBA
Supply and Stump Removal/Pier Reinstall (New Expiration Date:
07/31/2023)
$14,824Change CO #5-23 4/12/2023
CO #7-23 - ACTIVE CONSTRUCTION INC - Added playground survey
and ramp, irrigaiton sleeving, and shelter plinths (New Expiration Date:
07/31/2023)
$19,505Change CO #7-23 6/13/2023
CO #6-23 - ACTIVE CONSTRUCTION INC - Added gravel borrow and
native material removal (New Expiration Date: 07/31/2023)
$37,817Change CO #6-23 6/13/2023
CO#8-23 - Active Construction, Inc. - Change Order No. 8 for added soil
import/export and drainage connection at Philip Arnold Park. (New
Expiration Date: 07/31/2023)
$43,534Change CO #8-23 6/15/2023
CAG-23-169 William G. Moss (Biff Moss) - Entertainment for Farmers Market $500 $500 P 5/3/2023 9/30/2023
Contractor: (043158) WILLIAM G MOSS
5/3/2023
CAG-23-170 AQUA TECHNEX LLC - Vegetation Management at Coulon and Kennydale
Beach Parks
$5,969 $5,969 P 5/8/2023 8/8/2023
Contractor: (005250) AQUA TECHNEX LLC
5/8/2023
CAG-23-183 AC MOATE INDUSTRIES - Parking Lot Striping at Coulon Park $32,627 $32,627 P 5/10/2023 7/10/2023
Contractor: (000098) AC MOATE INDUSTRIES
5/10/2023
CAG-23-184 Altus Traffic Management, LLC - Traffic Control Services to Close Logan
Ave S for Renton Farmers Market
$12,789 $12,789 P 5/15/2023 9/29/2023
Contractor: (006602) ALTUS TRAFFIC MANAGEMENT LLC
5/15/2023
CAG-23-218 MOUNTAIN MIST- Water Filtration unit rentals for Park shops $3,000 $3,000 P 6/1/2023 12/31/2025
Contractor: (051555) MOUNTAIN MIST
6/1/2023
CAG-23-219 King County Library System (KCLS) - Story Walk Program at Liberty Park
and Sunset Neighborhood Park. (June 1-30, 2023 at Liberty Park; July
1-31, 2023 at Sunset Neighborhood Park)
$0 $0 M 6/1/2023 8/1/2023
Contractor: UNKNOWN VENDOR
6/1/2023
BELOW CONTRACTS RECORDED FROM PREVIOUS REPORTING PERIOD
CAG-22-013 Terra Dynamics, Inc. - Kiwanis Park Improvements $4,780,000 $5,336,213 P 4/14/2022 7/31/2023
Contractor: (080368) TERRA DYNAMICS
Number DateType DescriptionAmount
CO #4-23 - Terra Dynamics - Signage modifications, RPA size
modifications, light post coupling modifications, and Extension of Contract
Time to May 31, 2023 (New Expiration Date: 05/31/2023)
$19,265Change CO #4-23 3/30/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 25 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
5
$54,886
6
$149,763
11
$204,648
1
$0
0
$0
1
$0
6
$54,886
6
$149,763
12
$204,648
Total
Change
New
TotalMiscellaneousPayablesPr-Parks Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 26 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Pr-Ppnr
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 27 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Pr-Ppnr
CAG-19-360 Hough Beck & Baird - Design & construction admin support for Philip
Arnold Park site improvements
$392,829 $540,408 P 12/12/2019 8/31/2023
Contractor: (035300) HOUGH BECK & BAIRD INC
Disadvantaged Business, Women Owned
Number DateType DescriptionAmount
Adden #6-23 - Hough Beck & Baird Inc - Provide additional professional
services for the Philip Arnold Park Site Improvements project. (New
Expiration Date: 08/31/2023)
$21,586Addendum Adden #6-23 5/24/2023
CAG-20-011 Bruce Dees & Associates - Professional Design & Construction Admin
Services for Kiwanis Park Site Improvements
$364,045 $408,267 P 1/13/2020 9/30/2023
Contractor: (011885) BRUCE DEES & ASSOCIATES LLC
Number DateType DescriptionAmount
Adden #5-23 - Bruce Dees & Associates - Provide Professional Services
for the Kiwanis Park Site Improvements for project CA and closeout -
Contract time extension (New Expiration Date: 09/30/2023)
$12,950Addendum Adden #5-23 5/24/2023
CAG-22-014 Redside Construction, LLC - Construction of Coulon North Water Walk Site
Improvements
$4,659,432 $4,831,838 P 9/14/2022 10/1/2023
Contractor: (044941) REDSIDE CONSTRUCTION LLC
Number DateType DescriptionAmount
CO #4-23 - REDSIDE CONSTRUCTION LLC - Additional painting of the
Pilot House roof for the Coulon North Water Walk (New Expiration Date:
10/01/2023)
$27,346Change CO #4-23 4/4/2023
CO #5-23 - REDSIDE CONSTRUCTION LLC - Additional galvanizing
cost for structural steel. (New Expiration Date: 10/01/2023)
$32,916Change CO #5-23 5/18/2023
CO #6-23 - REDSIDE CONSTRUCTION LLC - Coulon North Water Walk
- New light boxes, core driling, angle ledger/pour, patching, survey,
custom clips, replace dock arm (New Expiration Date: 10/01/2023)
$20,790Change CO #6-23 6/14/2023
CAG-22-042 Northwest Playground Equipment, Inc - Cascade Park Playground
Equipment Replacement
$291,856 $356,268 P 2/15/2022 5/24/2023
Contractor: (056742) NW PLAYGROUND EQUIPMENT INC
Number DateType DescriptionAmount
CO #2-23 - NW PLAYGROUND EQUIPMENT INC - Additional grading,
fencing/barriers, and hydroseeding and Time Extension to May 24, 2023
(New Expiration Date: 05/24/2023)
$7,852Change CO #2-23 5/3/2023
CAG-22-399 COMBINED CUTTING CONTRACTORS - 2023 On-Call Tree Maintenance
Services
$35,000 $40,200 P 12/15/2022 12/31/2023
Contractor: (016969) COMBINED CUTTING CONTRACTORS
Number DateType DescriptionAmount
CO #1-23 - Combined Cutting Contractors - On-Call Tree Services
Agreement to add funds to contract. Urgent work at Liberty Park on eight
(8) trees. (New Expiration Date: 12/31/2023)
$5,200Change CO #1-23 4/20/2023
Adden #2-23 - COMBINED CUTTING CONTRACTORS - Addendum to
Adden #2-23 - COMBINED CUTTING CONTRACTORS - On-Call Tree
Services Agreement to pay for services rendered. $26,424.00 to be
disbursed from balance remaining on contract. (New Contract balance =
$13 (New Expiration Date: 12/31/2023)
$0Addendum Adden #2-23 5/3/2023
CAG-22-405 The Davey Tree Expert Company - 2023 On-Call Tree Maintenance
Services
$35,000 $35,000 P 12/21/2022 12/31/2023
Contractor: (020110) THE DAVEY TREE EXPERT COMPANY
Number DateType DescriptionAmount
Adden #1-23 - The Davey Tree Expert Company - Addendum to On-Call
Tree Services Agreement for invoice payment ($20,771.47 to be
disbursed from balance remaining on contract. New Contract Balance =
$14,228.53) (New Expiration Date: 12/31/2023)
$0Addendum Adden #1-23 6/5/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 28 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Pr-Ppnr
CAG-23-077 RON'S STUMP REMOVAL & TREE SVC - Late Winter 2023 Tree Services
Agreement
$31,544 $31,544 P 3/7/2023 9/1/2023
Contractor: (069196) RON'S STUMP REMOVAL & TREE SVC
Number DateType DescriptionAmount
CO #1-23 - RON'S STUMP REMOVAL & TREE SVC - Extend contract
period (from 6/30/2023 to 9/01/2023) (New Expiration Date: 09/01/2023)
$0Change CO #1-23 6/5/2023
CAG-23-119 Ron's Stump Removal & Tree Service - Spring 2023 Tree Services
Agreement
$35,397 $35,397 P 4/5/2023 9/1/2023
Contractor: (069196) RON'S STUMP REMOVAL & TREE SVC
Number DateType DescriptionAmount
CO #1-23 - Ron's Stump Removal & Tree Service - Extend contract
period (from 8/4/2023 to 9/01/2023).
$0Change6/5/2023
CAG-23-120 Al Riedmann, Riedmann Enterprises, LLC dba Seattle Grow - 2023
Landscape & Tree Watering Services Agreement
$100,000 $100,000 P 4/5/2023 12/31/2023
Contractor: (001508) AL RIEDMANN
4/5/2023
CAG-23-140 Mid Pac Construction, Inc.- Tennis Court resurfacing and court repairs at
Liberty Park Tennis Court.
$51,444 $51,444 P 4/19/2023 6/30/2023
Contractor: (049490) MID PAC CONSTRUCTION INC
4/19/2023
CAG-23-204 Northwest Playground Equipment, Inc. - Replace slide at Kennydale Beach
Playground
$4,733 $4,733 P 5/18/2023 9/30/2023
Contractor: (056742) NW PLAYGROUND EQUIPMENT INC
5/18/2023
CAG-23-207 Trelstad Tree - 2023 Maple Valley Highway Roadside Tree Maintenance
Agreement
$49,545 $49,545 P 5/30/2023 8/25/2023
Contractor: (082475) TRELSTAD TREE
5/30/2023
CAG-23-236 NOW Environmental Services, Inc. - Asbestos and Lead Survey at 2718
Duvall Ave NE, Renton, WA (May Creek Park).
$1,500 $1,500 P 6/15/2023 7/31/2023
Contractor: (056000) NOW ENVIRONMENTAL SERVICES INC
Women Owned
6/15/2023
CAG-23-240 RAVE Foundation - Agreement for Futsal Court at Tiffany Park. $0 $0 M 6/15/2023 12/31/2023
Contractor: UNKNOWN VENDOR
6/15/2023
BELOW CONTRACTS RECORDED FROM PREVIOUS REPORTING PERIOD
CAG-22-399 COMBINED CUTTING CONTRACTORS - 2023 On-Call Tree Maintenance
Services
$35,000 $40,200 P 12/15/2022 12/31/2023
Contractor: (016969) COMBINED CUTTING CONTRACTORS
Number DateType DescriptionAmount
Adden #1-23 - COMBINED CUTTING CONTRACTORS - Remove 1
large Cottonwood blown over River (no increase to contract dollar amount
- $13,762.50 to be disbursed from contract balance) (New Expiration
Date: 12/31/2023)
$0Addendum Adden #1-23 1/11/2023
CAG-23-121 Landau Associates, Inc.- Environmental Site Assessment & Report for
Parcel ID 0323059164 (May Creek Park Acquisition).
$7,500 $7,500 P 3/30/2023 5/30/2023
Contractor: (043313) LANDAU ASSOCIATES INC
3/30/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 29 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
7
$250,120
5
$34,536
7
$94,103
19
$378,759
1
$0
0
$0
0
$0
1
$0
8
$250,120
5
$34,536
7
$94,103
20
$378,759
Total
Change
Addendum
New
TotalMiscellaneousPayablesPr-Ppnr Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 30 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Pr-Rec
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 31 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Pr-Rec
CAG-21-174 King County Dept of Community & Human Services - oversight
coordination & implementation of Renton Senior Activity Center Hub
($115,384 rev)
$115,384 $168,969 R 7/13/2021 12/31/2023
Contractor: UNKNOWN VENDOR
Number DateType DescriptionAmount
Adden #1-23 - King County Comm & HS Adult Services Division - Renton
Senior Center Hub VSHSL, time extension, distribution 2022 reduction,
2023 addition. (New Expiration Date: 12/31/2023)
$53,585Addendum Adden #1-23 4/5/2023
CAG-22-331 Pacific Northwest Basketball Officials Assoc - Providing Officials for Men’s
Rec Basketball Leagues
$20,000 $20,000 P 10/6/2022 8/31/2023
Contractor: (059510) PACIFIC NW BASKETBALL OFFICALS
Minority Owned
Number DateType DescriptionAmount
Adden #1-23 - PACIFIC NW BASKETBALL OFFICALS - New agreement
for PNBOA referee fees (New Expiration Date: 08/31/2023)
$0Addendum Adden #1-23 4/11/2023
CAG-23-139 SNAPOLOGY OF EASTSIDE - Provide STEAM Specialty Camps $30,000 $30,000 P 4/11/2023 12/31/2023
Contractor: (075995) SNAPOLOGY OF EASTSIDE
4/11/2023
CAG-23-145 JAPAN CREATIVE ARTS - Tiako Drumming Performance for Recreation
Program
$1,882 $1,882 P 4/13/2034 5/12/2023
Contractor: (039021) JAPAN CREATIVE ARTS
Minority Owned, Women Owned
4/13/2034
CAG-23-150 CHELSEA HUENNEKENS - Provide Enrichment Classes $12,000 $12,000 P 4/25/2023 12/31/2023
Contractor: (015059) CHELSEA HUENNEKENS
4/25/2023
CAG-23-171 ROACH GYMNASTICS INC - May-December 2023 gymnastics instructor
for Rec programming.
$36,000 $36,000 P 5/4/2023 12/31/2023
Contractor: (068800) ROACH GYMNASTICS INC
5/4/2023
CAG-23-172 NATIONAL EVENT PROS - National Event Pros is providing rides and ride
staff for the Kids Zone at Renton River Days
$60,000 $60,000 P 5/15/2023 9/30/2023
Contractor: (016395) NATIONAL EVENT PROS
5/15/2023
CAG-23-175 SEA METRO SOFTBALL UMPIRE ASSN - Contract with Seattle Metro
Softball Umpire Association for game officials for softball season
$25,000 $25,000 P 5/9/2023 11/30/2023
Contractor: (072700) SEA METRO SOFTBALL UMPIRE ASSN
5/9/2023
CAG-23-182 Triple Threat, LLC - Live band performance for Senior Center Juneteenth
lunch
$1,600 $1,600 P 5/10/2023 6/16/2023
Contractor: (022560) DWAIN BICKHAM
Minority Owned
5/10/2023
CAG-23-185 JORDAN BYE - Instructor of enrichment classes $10,000 $10,000 P 5/15/2023 12/31/2023
Contractor: (039828) JORDAN BYE
5/15/2023
CAG-23-200 BELL LAP PRODCUTIONS LLC - Race Timing for Dragon Dash 5K and
K9 Candy Cane Race
$6,000 $6,000 P 5/19/2023 12/3/2023
Contractor: (008566) BELL LAP PRODCUTIONS LLC
Women Owned
5/19/2023
CAG-23-208 STEVEN A SCHMIDT - Contract for rec course instructor $450 $450 P 5/30/2023 5/24/2024
Contractor: (078129) STEVEN A SCHMIDT
5/30/2023
CAG-23-210 ELIZABETH CHRISTIAN BANTA - Professional services agreement for line
dancing instruction.
$15,000 $15,000 P 6/1/2023 5/30/2024
Contractor: (023685) ELIZABETH CHRISTIAN BANTA
6/1/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 32 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Pr-Rec
CAG-23-220 Animal Encounters - Petting zoo for Renton River Days 2023 $9,250 $9,250 P 6/1/2023 7/23/2023
Contractor: (005122) ANIMAL ENCOUNTERS
6/1/2023
CAG-23-221 SOUNDS UNLIMITED - DJ Services for Adaptive Programs $450 $450 P 5/16/2023 12/31/2023
Contractor: (065720) RANDELL KRUSE
5/16/2023
CAG-23-222 MARTHA N SOTO - Forza Dragon Martial Arts - Instructor for Tae Kwon
Do classes at Highlands Community Center
$35,000 $35,000 P 6/16/2023 12/31/2023
Contractor: (047255) MARTHA N SOTO
Minority Owned, Women Owned
6/16/2023
CAG-23-243 FUNFLICKS - Provide outdoor movie equipment rentals for summer
outdoor movies.
$18,000 $18,000 P 6/24/2023 8/31/2023
Contractor: UNKNOWN VENDOR
6/24/2023
CAG-23-247 RENTON ROWING CENTER - Instruction for Row, Paddle, Play program $8,000 $8,000 P 6/27/2023 8/11/2023
Contractor: (067180) RENTON ROWING CENTER
6/27/2023
BELOW CONTRACTS RECORDED FROM PREVIOUS REPORTING PERIOD
CAG-22-139 King County Natural Resources & Parks - Grant funds for scholarships &
equipment purchase for Adaptive Recreation Program ($10,000 rev)
$10,000 $10,000 R 4/25/2022 12/31/2023
Contractor: UNKNOWN VENDOR
Number DateType DescriptionAmount
Adden #1-23 - King County Natural Resources & Parks - Get Active Stay
Active Grant term extension to 12/31/2023 (New Expiration Date:
12/31/2023)
$0Addendum Adden #1-23 3/24/2023
CAG-23-026 Lomax Kvitek - Age-friendly Renton Action Plan and Resource Webpage
Development (1/20/2023-3/31/2023)
$15,000 $22,500 P 1/12/2023 1/23/2024
Contractor: (042451) VICTORIA LOMAX KVITEK
Minority Owned, Women Owned
Number DateType DescriptionAmount
Adden #1-23 - Lomax Kvitek - Work modification and time extension
(New Expiration Date: 01/23/2024)
$7,500Change Adden #1-23 3/31/2023
CAG-23-144 Law offices of Daniel Kellogg - Senior Center Free Legal Advice $0 $0 M 1/24/2023 12/31/2023
Contractor: UNKNOWN VENDOR
1/24/2023
16
$268,632
1
$0
1
$7,500
18
$276,132
0
$0
2
$53,585
0
$0
2
$53,585
1
$0
0
$0
0
$0
1
$0
17
$268,632
3
$53,585
1
$7,500
21
$329,717
Total
Change
Addendum
New
TotalMiscellaneousReceivablesPayablesPr-Rec Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 33 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Public Works
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 34 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Public Works
CAG-16-103 RH2 Engineering, Inc. - Replace Highlands 435 Pressure Zone Reservoirs
and Mains - Final Design and Bidding
$697,088 $1,472,294 P 6/8/2016 12/31/2023
Contractor: (068180) RH2 ENGINEERING INC
Number DateType DescriptionAmount
Adden #8-23 - RH2 ENGINEERING INC - Replacement of Highlands
435 Pressure Zone Reservoirs and Mains - Final Design and Bidding
(New Expiration Date: 12/31/2023)
$348,330Addendum Adden #8-23 6/14/2023
CAG-17-082 Perteet, Inc. - N. Park Avenue Extension - Preliminary Design and Design
Report Phase
$159,655 $1,051,836 P 5/9/2017 12/31/2026
Contractor: (061292) PERTEET INC
Number DateType DescriptionAmount
Adden #17-23 - Perteet, Inc. - Supplement 17 N. PARK AVENUE
EXTENSION- PRELIMINARY DESIGN AND DESIGN REPORT PHASE
(New Expiration Date: 12/31/2026)
$0Addendum Adden #17-23 5/5/2023
REVISED Adden #17-23 - Perteet, Inc. - Supplement 17 N. PARK
AVENUE EXTENSION- PRELIMINARY DESIGN AND DESIGN
REPORT PHASE
$538,957Addendum Adden #17a-23 6/6/2023
CAG-18-201 Department of Ecology - DOE - Duvall Avenue NE Project - Grant
agreement to include water quality improvements
$1,631,919 $1,631,919 R 9/23/2018 6/30/2023
Contractor: (4638) WA STATE DEPT OF ECOLOGY
Number DateType DescriptionAmount
Adden #3-23 - Washington State Department of Ecology - Extend grant
agreement expiration date and adjust budget among tasks (New
Expiration Date: 06/30/2023)
$0Addendum Adden #3-23 5/16/2023
CAG-20-032 DGK, Inc. - Park Ave North Extension Project (Environmental & Permitting)$34,970 $160,704 P 1/28/2020 12/31/2027
Contractor: (091850) WIDENER & ASSOCIATES
Number DateType DescriptionAmount
Adden #3-23 -Weidener & Associates - PARK AVE NORTH EXTENSION
PROJECT (ENVIRONMENTAL & PERMITTING) (New Expiration Date:
12/31/2027)
$34,963Addendum Adden #3-23 5/1/2023
CAG-20-065 Reed Trucking & Excavating, inc. - Duvall Av NE Construction Contract $5,218,172 $5,911,393 P 7/21/2021 12/31/2999
Contractor: (066295) REED TRUCKING & EXCAVATING INC
Number DateType DescriptionAmount
CO #30-23 - Reed Trucking & Excavating, Inc. - Adjustments in bid item
quantities (New Expiration Date: 12/31/3000)
$443,000Change CO #30-23 4/7/2023
CO #32-23 - REED TRUCKING & EXCAVATING INC - wood fence (New
Expiration Date: 12/31/2999)
$1,892Change CO #32-23 5/25/2023
CO #31-23 - - REED TRUCKING & EXCAVATING INC - monument
restake (New Expiration Date: 12/31/2999)
$1,185Change Adden #31-23 5/25/2023
CAG-20-092 Widener & Associates - Support Services to relieve the flood caused
blockage of the Seaplane Base at the City of Renton Municipal Airport
$74,573 $74,573 P 4/28/2020 12/31/2024
Contractor: (091851) COWLING & CO LLC
Number DateType DescriptionAmount
Adden #2-23 - Cowling & Co, LLC - Time Extension (New Expiration
Date: 12/31/2024)
$0Addendum Adden #2-23 4/5/2023
CAG-20-106 Mott MacDonald, LLC - Assessment of flood damages to the Airport
Seaplane Base Infrastructure & nagavational areas
$67,700 $87,995 P 5/18/2020 12/31/2024
Contractor: (051522) MOTT MACDONALD LLC
Number DateType DescriptionAmount
Adden #3-23 - MOTT MACDONALD LLC -Time Extension Only (New
Expiration Date: 12/31/2024)
$0Addendum Adden #3-23 5/26/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 35 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Public Works
CAG-20-126 Active Construction, Inc. - Lake Washington Loop Trail Project $1,709,709 $1,784,872 P 4/7/2021 12/31/2030
Contractor: (000767) ACTIVE CONSTRUCTION INC
Number DateType DescriptionAmount
CO #32-23 - Active Construction, Inc. - Pavement Marking Revisions
(New Expiration Date: 12/31/2030)
$-17,592Change CO #33-23 4/10/2023
CO #32-23 - Active Construction, Inc. - Pavement Marking Revisions
(New Expiration Date: 12/31/2030)
$0Change CO #32-23 4/10/2023
CAG-20-399 BHC Consultants LLC - Burnett Ave S and Williams Ave S Water Quality
Retrofit Project (SWP274088)
$493,533 $543,409 P 10/26/2020 9/3/2024
Contractor: (009510) BHC CONSULTANTS LLC
Number DateType DescriptionAmount
Adden #2-23 - BHC Consultants, LLC. - Burnett Ave S & Williams Ave S
Water Quality Retrofit Project (New Expiration Date: 09/03/2024)
$49,876Addendum Adden #2-23 5/4/2023
CAG-21-193 RH2 Engineering, Inc. - West Hills Booster Pump Station Improvements
Design
$216,343 $264,929 P 8/5/2021 6/30/2023
Contractor: (068180) RH2 ENGINEERING INC
Number DateType DescriptionAmount
RH2 ENGINEERING INC - Additional design work for West Hill Booster
Pump Station Improvements Project WTR-27-04184 (New Expiration
Date: 06/30/2023)
$48,586Addendum Adden #3-23 4/4/2023
CAG-21-231 Wagner Architects - Provide a master plan that will include layout,
development and location for parks maintenance shop
$50,000 $80,000 P 9/30/2021 12/31/2024
Contractor: (068828) ROBERT WAGNER ARCHITECTS
Number DateType DescriptionAmount
Adden #2-23 - Wagner Architects - Additional site assessment for Parks
Maintenance Shop - Time Extension only (New Expiration Date:
12/31/2023)
$0Addendum Adden #2-23 4/14/2023
CAG-22-237 Reynolds General Contracting - Renton Airport Office Renovation project -
243 Building
$679,800 $827,371 P 12/29/2022 12/31/2023
Contractor: (068090) REYNOLDS GENERAL CONTRACTING
Number DateType DescriptionAmount
CO #4-23 - Reynolds General Contracting - Increase scope of work &
cost: Includes abatement of hazardous drywall & wall panel mastic.
HVAC pipe/connections found missing during the demo of ceilings.
Mechanical equip. not working properly. Replace furnace (New Expiration
Date: 12/31/2023)
$48,529Change CO #4-23 4/14/2023
CO #3-23 - Reynolds General Contracting - RENTON AIRPORT OFFICE
RENOVATION PROJECT - 243 BUILDING (New Expiration Date:
12/31/2023)
$4,862Change CO #3-23 4/17/2023
CO #5-23 - Reynolds General Contracting - Bollard and furniture removal
and disposal (New Expiration Date: 12/31/2023)
$8,740Change CO #5-23 6/8/2023
CO #6-23 - Reynolds General Contracting - HAZMAT Abatement &
HVAC (New Expiration Date: 12/31/2023)
$43,425Change CO #6-23 6/8/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 36 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Public Works
CAG-22-311 Kamins Construction Inc. - Safe Routes to Transit - NE Sunset Blvd Project
- adding a crossing and signal adjustments at NE Sunset Boulevard and
Edmonds Avenue Northeast, adding midblock crossings on Northeat
Sunset Boulevard between Northeast 10th Street and Kirkalnd Avenue
Northeast.
$318,149 $427,066 P 3/15/2023 12/31/2999
Contractor: (040115) KAMINS CONSTRUCTION INC
Number DateType DescriptionAmount
CO #4-23 - Kamins Construction, Inc. - Installation of electrical service
cabinet on new foundation (New Expiration Date: 12/31/2999)
$40,916Change CO #4-23 12/31/2999
CO #5-23 - Kamins Construction, Inc. - Installation of electrical service
cabinet on new foundation (New Expiration Date: 12/31/2999)
$4,000Change CO #5-23 5/17/2023
CO #6-23 - Kamins Construction, Inc. -Install/Remove curb and gutter per
revised project plans (New Expiration Date: 12/31/2999)
$35,000Change CO #6-23 5/17/2023
CO #8-23 - Kamins Construction, Inc. - Patch roadway from removal of
c-curbing at Edmonds intersection (New Expiration Date: 12/31/2999)
$1,000Change CO #8-23 5/26/2023
CO #1-23 - Kamins Construction, Inc. - Directional Boring FA (New
Expiration Date: 12/31/2999)
$16,000Change CO #1-23 6/2/2023
CO #2-23 - Kamins Construction, Inc. - Removal of installation of
detectable warning surfaces (New Expiration Date: 12/31/2999)
$0Change CO #2-23 5/25/2023
CO #3-23 - Kamins Construction, Inc. - Removal of conflicting pavement
markings and adjustments to tuft curb locations (New Expiration Date:
12/31/2999)
$10,000Change CO #3-23 5/9/2023
CO #7-23 - Kamins Construction Inc. - Roadside restoration around
newly installed pedestrian ramps and service cabinet (New Expiration
Date: 12/31/2999)
$2,000Change CO #7-23 5/17/2023
CAG-22-343 HCON Incorporated - Sunset Gardens Off-Site Water Main Improvements
(WTR-27- 4199)
$879,534 $927,769 P 1/30/2023 12/31/2023
Contractor: (033165) HCON INCORPORATED
Number DateType DescriptionAmount
CO #1-23 - HCON Incorporated - Sunset Gardens Off-Site Water Main
Improvements (WTR-27-4199) CO-01 (New Expiration Date: 12/31/2023)
$48,235Change CO #1-23 5/4/2023
CAG-22-376 Graham Baba Architects - Concept designs (3) and estimates for Pavilion $106,862 $116,862 P 12/6/2022 6/30/2023
Contractor: (012908) GRAHAM BABA ARCHITECTS PLLC
Number DateType DescriptionAmount
Adden #1-23 - Graham Baba Architects - Additional services requested
by the City (New Expiration Date: 06/30/2023)
$10,000Addendum Adden #1-23 4/4/2023
CAG-23-005 GARY HARPER CONSTRUCTION INC - Construction Contract for West
Hill Booster Pump Station Improvements Project WTR-27-04184
$2,669,705 $2,669,705 P 4/24/2023 12/31/2024
Contractor: (028562) GARY HARPER CONSTRUCTION INC
4/24/2023
CAG-23-048 LASER UNDERGROUND - Thunder Hills Interceptor Rehabilitation $2,052,253 $2,052,253 P 6/2/2023 12/31/2023
Contractor: (043664) LASER UNDERGROUND
Women Owned
6/2/2023
CAG-23-103 WSDOT - WSDOT Utility Construction Agreement LJTB 1048 for City cost
for utilities removal and restoration as part of the Lind Ave SW Bridge
Repair Project
$220,602 $220,602 P 4/18/2023 12/3/2024
Contractor: (089300) DEPT. OF TRANSPORTATION
4/18/2023
CAG-23-125 Installation of a New LNL-X3300 Panels at 4 City Locations; City Shop,
Facilities Shop, Senior Center, and Vehicle Evidence
$16,494 $16,494 P 4/4/2023 8/1/2023
Contractor: (043705) ENTRANCE CONTROLS
4/4/2023
CAG-23-126 Installation of 23 Card Access Door Systems and associated equipment at
City Hall and Public Work
$135,006 $135,006 P 4/5/2023 10/1/2023
Contractor: (043705) ENTRANCE CONTROLS
4/5/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 37 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Public Works
CAG-23-127 BlueLine - NE 12th St Water Main Replacement Project (WTR-27-04233) $178,810 $178,810 P 4/5/2023 6/30/2024
Contractor: (010224) THE BLUELINE GROUP, LLC
4/5/2023
CAG-23-128 Century West Engineering Corp - Taxiway Alpha Reconstruction - Design $973,192 $973,192 P 4/5/2023 12/31/2025
Contractor: (014533) CENTURY WEST ENGINEERING CORP
4/5/2023
CAG-23-130 RH2 Engineering, Inc. - Services During Construction (SDC) contract -
West Hill Booster Pump Station Improvements Project, WTR-27-04184
$220,000 $220,000 P 5/19/2023 1/31/2025
Contractor: (068180) RH2 ENGINEERING INC
5/19/2023
CAG-23-143 GeoEngineers, Inc - Panther Creek at Talbot Road S Culvert Replacement
Project
$576,746 $576,746 P 5/10/2023 6/5/2024
Contractor: (029436) GEO ENGINEERS INC
5/10/2023
CAG-23-146 DKS ASSOCIATES - to assist with community engagement and the
development of traffic safety lessons for elementary, middle, and high
school youth as well as young adults
$98,700 $98,700 P 4/24/2023 1/31/2024
Contractor: (021454) DKS ASSOCIATES
4/24/2023
CAG-23-163 DOWL, LLC - This agreement with DOWL, LLC, in an amount not to
exceed $209,368, is for design services for security improvements and
enhancements at the Renton Municipal Airport.
$209,368 $209,368 P 5/4/2023 12/31/2024
Contractor: (021970) DOWL LLC
5/4/2023
CAG-23-164 PERKINS COIE LLP - Review of construction documents $20,000 $20,000 P 4/28/2023 12/31/2023
Contractor: (061142) PERKINS COIE LLP
4/28/2023
CAG-23-165 SEATTLE MODERN OFFICE LLC - Seattle Modern Office will assist the
city on space planning and design.
$34,500 $34,500 P 4/28/2023 12/31/2023
Contractor: (072638) SEATTLE MODERN OFFICE LLC
4/28/2023
CAG-23-166 DKS ASSOCIATES - To assist with community engagement and the
development of traffic safety lessons for elementary, middle, and high
school youth as well as young adults.
$98,700 $98,700 P 5/4/2023 1/31/2024
Contractor: (021454) DKS ASSOCIATES
5/4/2023
CAG-23-167 Fehr & Peers - Complete an update of the 2008 Comprehensive Walkway
P
$92,460 $92,460 P 5/4/2023 12/31/2024
Contractor: (025801) FEHR & PEERS
5/4/2023
CAG-23-174 City-wide window washing, pressure washing and gutter cleaning project $81,813 $81,813 P 5/9/2023 12/31/2023
Contractor: (001777) ALEXANDER MOORE HOMES
Minority Owned, Women Owned
5/9/2023
CAG-23-176 State of Washington Department of Ecology - Burnett and Williams Water
Quality Retrofit (SWP-27-4088, WQC-2023-Renton-00022 ) REC:
$927,000
$927,000 $927,000 R 5/12/2023 6/30/2025
Contractor: UNKNOWN VENDOR
5/12/2023
CAG-23-178 QWEST CORPORATION - Joint Utility Trench Agreement - Rainier Ave
Corridor Improvements Phase 4 - JUT Agreement with CenturyLink/Lumen
(receivable)
$0 $0 R 5/17/2023 12/9/2999
Contractor: UNKNOWN VENDOR
5/17/2023
CAG-23-179 FOSTER GARVEY PC - Legal Services, Permanent Easement,
Temporary Construction Easement, Purchase and Sale Agreement,
Monroe Ave NE Infiltration Facility
$25,000 $25,000 P 5/11/2023 12/31/2024
Contractor: (027127) FOSTER GARVEY PC
5/11/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 38 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Public Works
CAG-23-188 Comcast Cable Communications Management, LLC - Rainier Ave s
Corridor Improvements Project Joint Utility Trench -Joint Utility Trench
Agreement - Rainier Ave Corridor Improvements Phase 4
$385,691 $385,691 R 6/13/2023 12/31/2040
Contractor: UNKNOWN VENDOR
6/13/2023
CAG-23-190 Pivetta Bros Construction - Rainier Ave S Corridor Improvements Phase 4
project- PERMISSION TO PARK/STAGING LAYDOWN AT 300 RAINIER
AVE N PARKING LOT
$0 $0 M 5/26/2023 4/30/2025
Contractor: UNKNOWN VENDOR
5/26/2023
CAG-23-213 Sound Resource Management Group, LLC. - Solid Waste Consultant
Services
$32,000 $32,000 P 5/26/2023 12/31/2024
Contractor: (076055) SOUND RESOURCE MGMT GROUP INC
5/26/2023
CAG-23-229 THREE RIVERS MOSQUITO & VECTOR - 2023 Mosquito Abatement
Program SWP-27-2000
$87,271 $87,271 P 6/14/2023 12/1/2023
Contractor: (081341) THREE RIVERS MOSQUITO & VECTOR
6/14/2023
CAG-23-231 GREAT FLOORS COMMERCIAL - Police 1st floor carpet replacement. $13,442 $13,442 P 6/14/2023 9/14/2023
Contractor: (013781) GREAT FLOORS COMMERCIAL
6/14/2023
CAG-23-237 FRESH FAMILY LLC - Removal of Awning and ensure Building Envelope
once removed at the Liberty Park Grandstand
$11,836 $11,836 P 6/15/2023 7/31/2023
Contractor: (056000) NOW ENVIRONMENTAL SERVICES INC
Women Owned
6/15/2023
CAG-23-238 FOSTER GARVEY PC - Legal representation and consultation for the
Kennydale Lakeline Sewer Upgrade Project.
$25,000 $25,000 P 6/15/2023 12/31/2026
Contractor: (027127) FOSTER GARVEY PC
6/15/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 39 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Public Works
BELOW CONTRACTS RECORDED FROM PREVIOUS REPORTING PERIOD
CAG-17-037 RH2 Engineering, Inc. - Water and Wastewater Utilities 2017/2018 General
Services
$227,322 $391,502 P 3/6/2017 12/31/2024
Contractor: (068180) RH2 ENGINEERING INC
Number DateType DescriptionAmount
Adden #4-23 - RH2 Engineering, inc. - Water and Water \Waste Utilities
2017/2018 General Services (New Expiration Date: 12/31/2024)
$0Addendum Adden #4-23 3/21/2023
CAG-17-082 Perteet, Inc. - N. Park Avenue Extension - Preliminary Design and Design
Report Phase
$159,655 $1,051,836 P 5/9/2017 12/31/2026
Contractor: (061292) PERTEET INC
Number DateType DescriptionAmount
Adden #16-23 - Perteet, Inc. - Supplement 16 redistributes remaining
design phase budget to Chudgar Engineering for design phase costs and
to Perteet for early construction services. (New Expiration Date:
12/31/2025)
$0Addendum Adden #16-23 3/30/2023
CAG-20-127 Perteet, Inc. - Williams Avenue S and Wells Avenue S Conversion Project
Construction Management Services
$1,539,857 $1,824,153 P 6/30/2020 12/31/2024
Contractor: (061292) PERTEET INC
Number DateType DescriptionAmount
Adden #7-23 - Perteet, Inc - Supplement #7 funds the required additional
construction management services to cover the extra work on this project
during the extended project duration in order to close out the project,
change orders, and negotiations (New Expiration Date: 12/31/2024)
$51,316Addendum Adden #7-23 3/21/2023
CAG-21-040 Washington State Department of Ecology - Heather Downs Detention WQ
Retrofit Project Construction Grant 00187 (SWP273980) Grant - $307,000
($230,250 Grant, $76,750 City Match)
$0 $0 R 6/11/2021 12/31/2022
Contractor: UNKNOWN VENDOR
Number DateType DescriptionAmount
Adden #1-23 - Washington State Department of Ecology - Deobligating
funds - Heather Downs Detention Pond WQ Retrofit (SWP-27-3989,
WQC-2021-Renton-00 187) (New Expiration Date: 12/31/2022)
$0Addendum Adden #1-23 3/31/2023
CAG-21-151 Perteet, Inc. - Evaluation of Pavement Management Plan Strategies $23,680 $71,840 P 6/10/2021 7/31/2023
Contractor: (061292) PERTEET INC
Number DateType DescriptionAmount
AMENDED Adden #2A-23 - Perteet, Inc - The Consultant will now be
responsible for the development of specific projects. This should have
had an amount of $14,470.00 to pay on it. since we put .01 in the 2nd
addendum we are now adding 14,469.99 in
$14,470Addendum Adden 2A 1/12/2023
CAG-22-094 West Coast Signal, Inc. - Signal pole replacement (not to exceed $25,000) $25,000 $25,000 P 4/5/2022 3/3/2023
Contractor: (090547) WEST COAST SIGNAL INC
4/5/2022
CAG-22-163 PIVETTA BROS CONSTRUCTION INC - Rainier Ave S Corridor
Improvements Phase 4 - Construction Contract
$28,284,173 $28,284,173 P 12/22/2022 12/31/2999
Contractor: (062035) PIVETTA BROS CONSTRUCTION INC
Number DateType DescriptionAmount
PIVETT A BROS CONSTRUCTION INC - Night Work (New Expiration
Date: 12/31/2999)
$0Change CO #1-23 3/30/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 40 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Public Works
CAG-22-190 Carollo Engineers, Inc. - Long Range Wastewater Management Plan
Submittal and Support
$23,992 $49,950 P 5/31/2022 12/31/2023
Contractor: (013783) CAROLLO ENGINEERS PC
Number DateType DescriptionAmount
Adden #1-23 - Carollo Engineers, Inc - Long Range Wastewater
Management Plan Submittal and Support (New Expiration Date:
12/31/2023)
$25,958Addendum Adden #1-23 3/9/2023
CAG-22-219 Reynolds General Contracting, Inc. - Renton City Hall - HR Tenant
Improvements Project
$383,148 $383,148 P 3/17/2023 12/31/2023
Contractor: (068090) REYNOLDS GENERAL CONTRACTING
3/17/2023
CAG-22-265 Olson Brothers Excavating, Inc -Park Avenue N Extension - construction
Contract
$3,635,342 $3,635,342 P 3/21/2023 12/5/2028
Contractor: (057809) OLSON BROTHERS EXCAVATING INC
3/21/2023
CAG-22-311 Kamins Construction Inc. - Safe Routes to Transit - NE Sunset Blvd Project
- adding a crossing and signal adjustments at NE Sunset Boulevard and
Edmonds Avenue Northeast, adding midblock crossings on Northeat
Sunset Boulevard between Northeast 10th Street and Kirkalnd Avenue
Northeast.
$318,149 $427,066 P 3/15/2023 12/31/2999
Contractor: (040115) KAMINS CONSTRUCTION INC
Number DateType DescriptionAmount
CAG-22-390 Western Mechanical & Controls LLC - Replacement of Split Unit HVAC at
Liberty Park Admin Bldg.
$8,660 $8,660 P 12/12/2022 8/1/2023
Contractor: (090884) WESTERN MECHANICAL & CONTROLS
12/12/2022
CAG-22-391 Western Mechanical & Controls LLC - Fire Station #12 Split Unit Upgrade
for EOC Server Room from a 2 Ton to a 5 Ton
$28,562 $28,562 P 12/12/2022 8/1/2023
Contractor: (090884) WESTERN MECHANICAL & CONTROLS
12/12/2022
CAG-22-394 Department of Ecology - 2021-2023 Biennial Water Quality Stormwater
Capacity Grant - Receivable $50,000.00
$50,000 $50,000 R 3/6/2023 3/31/2023
Contractor: UNKNOWN VENDOR
3/6/2023
CAG-23-013 King County - 2023-2024 WRR Grant - this one covers solid waste projects
(rec: $194,334.00)
$194,334 $194,334 R 3/21/2023 12/31/2024
Contractor: UNKNOWN VENDOR
3/21/2023
CAG-23-064 2023-2024 ORCAS Cards and Business Passport ProductsKing County
Metro -
$86,279 $86,279 P 3/10/2023 2/28/2024
Contractor: (041608) KING CNTY FINANCE
3/10/2023
CAG-23-082 OSBORN CONSUL TING INC - Final Design of the SE 172nd St & 125th
Ave SE GSI Project
$132,614 $132,614 P 3/17/2023 12/31/2023
Contractor: (058414) OSBORN CONSULTING INC
3/17/2023
CAG-23-091 DKS ASSOCIATES - Safer Access to Neighborhood Destinations -Benson
Hill and West Hill communities including related School Districts to
understand the neighborhood destination and develop and administer
targeted traffic safety activities and 1MJrkshops
$98,700 $98,700 P 3/24/2023 1/31/2024
Contractor: (021454) DKS ASSOCIATES
3/24/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 41 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
32
$40,873,524
15
$1,122,456
19
$691,192
66
$42,687,172
5
$1,557,025
2
$0
0
$0
7
$1,557,025
1
$0
0
$0
0
$0
1
$0
38
$42,430,549
17
$1,122,456
19
$691,192
74
$44,244,197
Total
Change
Addendum
New
TotalMiscellaneousReceivablesPayablesPublic Works Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 42 of 43
AGENDA ITEM #8. c)
Contracts Fully Executed Detail
For 04/01/2023 to 06/30/2023
149
$43,859,167
47
$1,693,536
33
$942,557
229
$46,495,260
13
$3,602,378
6
$58,585
0
$0
19
$3,660,963
10
$0
2
$6,016
0
$0
12
$6,016
172
$47,461,544
55
$1,758,137
33
$942,557
260
$50,162,239
Total
Change
Addendum
New
TotalMiscellaneousReceivablesPayablesGrand Total by Type
1
$18,000
202
$44,107,864
1
$21,586
5
$76,995
2
$26,500
8
$148,976
10
$2,095,339
229
$46,495,260
18
$3,660,963
1
$0
0
$0
0
$0
0
$0
0
$0
0
$0
19
$3,660,963
12
$6,016
0
$0
0
$0
0
$0
0
$0
0
$0
0
$0
12
$6,016
31
$3,684,978
203
$44,107,864
1
$21,586
5
$76,995
2
$26,500
8
$148,976
10
$2,095,339
260
$50,162,239
Total
Women Owned
Minority Owned, Women Owned
Minority Owned, Disadvantaged
Business, Women Owned
Minority Owned
Disadvantaged Business, Women
Owned
Non-WMBE
Unknown Vendor
TotalMiscellaneousReceivablesPayablesGrand Total by WMBE
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:06:28AM Printed: 7/13/2023 Page 43 of 43
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Attorney
CAG-13-219 Pearlmark Harvest Lakeshore, LLC dba The Landing - Agreement related
to the Maintenance of the Landing's Rights-of-Way
$0 $0 M 12/13/2013 12/31/2023
Contractor: UNKNOWN VENDOR
12/13/2013
1
$0
1
$0
Total
TotalMiscellaneousAttorney Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 1 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
CED
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 2 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
CED
CAG-13-160 The Boeing Company - MOU regarding future dedication of certain
right-of-way along Logan Av & N 6th St
$0 $0 M 7/26/2013 12/31/2023
Contractor: UNKNOWN VENDOR
7/26/2013
CAG-20-162 Renton Housing Authority - Sunset Neighborhood Center Capital Grant
Agreement ($400,000)
$400,000 $400,000 R 9/1/2020 8/1/2023
Contractor: UNKNOWN VENDOR
9/1/2020
CAG-22-058 BERK Consulting, Inc - RAINIER/GRADY JUNCTION PLANNED ACTION $240,000 $337,600 P 3/3/2022 7/1/2023
Contractor: (009274) BERK CONSULTING INC
3/3/2022
BERK Consulting, Inc - Services for the Rainier/Grady Junction Planned
Action (add scope of work on travel demand model update) (New
Expiration Date: 07/01/2023)
$97,600Addendum Adden #2-22 9/5/2022
CAG-22-059 Department of Commerce - RAINIER/GRADY JUNCTION PLANNED
ACTION
$250,000 $250,000 P 3/3/2022 7/1/2023
Contractor: UNKNOWN VENDOR
3/3/2022
CAG-22-158 Port of Seattle - Agreement for funding through the Economic Development
Partnership Program (Rec $120,000)
$120,000 $120,000 R 5/16/2022 12/31/2023
Contractor: UNKNOWN VENDOR
5/16/2022
CAG-22-275 Sound Publishing - Shop Local Program $300,000 $300,000 P 8/23/2022 12/12/2023
Contractor: (076056) SOUND PUBLISHING INC
8/23/2022
CAG-22-409 KPG PSOMAS INC. - Professional services for preparation of Design and
Construction Standards
$98,014 $98,014 P 12/28/2022 12/31/2023
Contractor: (042774) KPG PSOMAS INC.
12/28/2022
CAG-22-413 Reid Middleton - Reid Middleton, Inc. agrees to provide structural and non-
structural plan review.
$4,000 $4,000 P 12/28/2022 12/31/2023
Contractor: (066451) REID MIDDLETON INC
12/28/2022
CAG-22-414 BHC Consultants - BHC Consultants, LLC agrees to provide structural and
non-structural plan review services, verifying compliance to current Renton
City Code requirements.
$34,500 $34,500 P 12/28/2022 12/31/2023
Contractor: (009510) BHC CONSULTANTS LLC
12/28/2022
CAG-22-415 Uyeta Landscape & Maintenance - Agreement for the purchase of Flower
Basket (Phase 1) for the downtown business district for spring 2023
through fall 2023.
$13,335 $13,335 P 12/28/2022 12/31/2023
Contractor: (085151) UYETA LANDSCAPE & MAINTENANCE
Minority Owned
12/28/2022
CAG-23-001 Kolke Consulting Group - Consultant agrees to provide structural and
non-structural plan review services, verifying compliance to current City
Code.
$4,000 $4,000 P 12/16/2022 12/31/2023
Contractor: (042740) KOLKE CONSULTING GROUP INC
12/16/2022
CAG-23-003 4LEAF, INC - 4LEAF, Inc. agrees to provide structural and non-structural
plan review services, verifying compliance to current Renton City Code
requirements.
$15,000 $15,000 P 1/3/2023 12/31/2023
Contractor: (000062) 4LEAF INC
1/3/2023
CAG-23-041 Renton Chamber of Commerce - Lodging Tax support for the 2023
operations of the Chamber Visitor's Center
$75,000 $75,000 P 2/13/2023 12/31/2023
Contractor: (066950) RENTON CHAMBER OF, COMMERCE
2/13/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 3 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
CED
CAG-23-046 Sky Urban Empowerment and Transformation Center - (Renton King
County Black Alliance for
Equity and Justice Program) - Lodging Tax funding for black history month
and the Juneteenth Celebration organized by Sky Urban as part of the
Renton King County Black Alliance for Equity and Justice program
$10,000 $10,000 P 2/15/2023 12/31/2023
Contractor: (075258) SKY URBAN EMPOWERMENT CTR
2/15/2023
CAG-23-054 RENTON CIVIC THEATER - Art grant funding for production of A Day in
Hollywood, a Night in Ukraine produced by the Renton Civic Theatre
$10,000 $10,000 P 2/21/2023 12/31/2023
Contractor: (066952) RENTON CIVIC THEATER
2/21/2023
CAG-23-070 RENTON DOWNTOWN PARTNERSHIP - Contracted services for the
facilitation of the Main Street Entrepreneur Workshop and Pitch
Competition
$30,000 $30,000 P 3/8/2023 12/31/2023
Contractor: (067104) RENTON DOWNTOWN PARTNERSHIP
3/8/2023
CAG-23-081 RENTON DOWNTOWN PARTNERSHIP - Art Grant for 2023 downtown
History and Art walking tour program
$2,500 $2,500 P 3/8/2023 12/31/2023
Contractor: (067104) RENTON DOWNTOWN PARTNERSHIP
3/8/2023
CAG-23-117 Look, Listen and learn TV - Art Grants funding for event for a community
event to launch children's public television program
$8,500 $8,500 P 3/30/2023 12/31/2023
Contractor: (037905) LOOK LISTEN AND LEARN TV
3/30/2023
CAG-23-168 Sadhana - Art Grant funding for the 2023 Tagore Festival $1,400 $1,400 P 4/4/2023 12/31/2023
Contractor: (070103) SADHANA
Minority Owned, Women Owned
4/4/2023
CAG-23-181 HIGHSCHOOL.GG - Lodging Tax funding for 2023 Renton City Retro event $20,000 $20,000 P 5/15/2023 12/31/2023
Contractor: (033247) HIGHSCHOOL.GG
5/15/2023
CAG-23-192 BAILE DIOR STUDIOS LLC - Lodging Tax funding for Stomp and Shake
multi-state dance competition
$6,500 $6,500 P 5/19/2023 12/31/2023
Contractor: (001430) BAILE DIOR STUDIOS LLC
Minority Owned, Disadvantaged Business, Women Owned
5/19/2023
CAG-23-201 UYET A LANDSCAPE & MAINTENANCE - Contract for installation and
maintenance of the downtown hanging flower baskets (May through
October 2023)
$42,000 $42,000 P 5/22/2023 12/31/2023
Contractor: (085151) UYETA LANDSCAPE & MAINTENANCE
Minority Owned
5/22/2023
CAG-23-202 Jeromeskee LLC dba Massive Break Challenge Breakdance League - Arts
Commission funding for Massive Breakdance Challenge
$3,400 $3,400 P 4/20/2023 12/31/2023
Contractor: (039098) JEROMESKEE LLC
Minority Owned
4/20/2023
CAG-23-215 DAVID AMES dba Chrome Molly - Performance Agreement for Summer
Concert at Coulon
$750 $750 P 5/30/2023 12/31/2023
Contractor: (020171) DAVID AMES
5/30/2023
CAG-23-216 DAVID SAMEK dba THE KENNYDALES - Performance Agreement for
Summer Concert at Coulon
$1,200 $1,200 P 5/30/2023 12/31/2023
Contractor: (070400) SAMEK, DAVID
5/30/2023
CAG-23-217 RAINIER CHORALE - Arts Commission funding for Pops Concert in June $2,500 $2,500 P 5/30/2023 12/31/2023
Contractor: (065529) RAINIER CHORALE
5/30/2023
CAG-23-235 RENTON DOWNTOWN PARTNERSHIP - Lodging tax funding for Main
Street Money program
$75,000 $75,000 P 6/21/2023 12/31/2023
Contractor: (067104) RENTON DOWNTOWN PARTNERSHIP
6/21/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 4 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
CED
CAG-23-248 Stacy Jones - Agreement for Summer Concert performance on July 6 $750 $750 P 5/24/2023 7/31/2023
Contractor: (076810) STACY JONES
Women Owned
5/24/2023
26
$1,345,949
2
$520,000
1
$0
29
$1,865,949
Total
TotalMiscellaneousReceivablesPayablesCED Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 5 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Ehhs-Admin
CAG-23-049 Giggles Entertainment, Inc.- Balloon artists for up to five EHHS
Neighborhood Program summer events.
$3,000 $3,000 P 2/15/2023 12/31/2023
Contractor: (029580) GIGGLES ENTERTAINMENT
Minority Owned, Women Owned
2/15/2023
CAG-23-090 RAIN CITY CATERING - Facility rental for the September 9, 2023
Multicultural Festival
$3,441 $3,441 P 3/20/2023 9/9/2023
Contractor: (065523) RAIN CITY CATERING
3/20/2023
CAG-23-205 Health Commons Project - Agreement for Behavioral Health Referral Hub $50,000 $55,050 P 5/25/2023 9/30/2023
Contractor: (033230) HEALTH COMMONS PROJECT
5/25/2023
3
$61,491
3
$61,491
Total
TotalPayablesEhhs-Admin Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 6 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Ehhs-Hs
CAG-22-289 King County Community Development - CDBG-CV3 Activities Grant. Term:
1/1/2022 - 4/30/2023.
$531,736 $531,736 R 9/8/2022 9/30/2023
Contractor: UNKNOWN VENDOR
9/8/2022
Adden #1-23 - King County Community Development - time extension to
9/30/2023 (New Expiration Date: 09/30/2023)
$0Addendum Adden #1-23 4/30/2023
CAG-22-333 St. Vincent de Paul - Centro Rendu - CDBG-CV3 Contract for Rent
Assistance
$100,000 $100,000 P 1/1/2022 8/31/2023
Contractor: (070296) ST. VINCENT DE PAUL, ATTN: ACCTG
1/1/2022
Adden #1-23 - Society of St. Vincent de Paul Seattle/King County -
Centro Rendu - Time extension (New Expiration Date: 08/31/2023)
$0Addendum Adden #1-23 4/30/2023
CAG-22-339 Domestic Abuse Women's Network (DAWN) - CDBG-CV3 Human Services
Agreement
$30,000 $30,000 P 1/1/2022 8/31/2023
Contractor: (020390) DAWN
1/1/2022
Adden #1-23 - Domestic Abuse Women's Network (DAWN) - time
extension (New Expiration Date: 08/31/2023)
$0Addendum Adden #1-23 4/30/2023
CAG-22-353 King County Sexual Assault Resource Center - CDBG-CV3 Contract for
Sexual Assault services (Term: 1/1/2022 - 4/30/2023)
$45,000 $45,000 P 1/1/2022 7/31/2023
Contractor: (042170) KING CNTY SEXUAL ASSAULT
1/1/2022
Adden #1-23 - King County Sexual Assault - CDBG-CV3 Time extension
(New Expiration Date: 07/31/2023)
$0AddendumAdden #1-23 6/12/2023
CAG-23-022 Mary's Place Seattle - 2022 Human Services Agreement-Supplemental
funding
$12,800 $12,800 P 1/5/2023 12/31/2023
Contractor: (040678) MARYS PLACE
1/5/2023
CAG-23-152 REACH Center of Hope - 2023 Human Services Agreement - REACH Meal
Coalition
$15,000 $15,000 P 1/1/2023 12/31/2023
Contractor: (067105) RENTON ECUMENICAL ASSOCIATION
1/1/2023
CAG-23-158 REACH Center of Hope - 2023 Human Services Agreement - Homeless
Services/Housing (HHS)
$51,630 $51,630 P 1/1/2023 12/31/2023
Contractor: (067105) RENTON ECUMENICAL ASSOCIATION
1/1/2023
9
$254,430
2
$531,736
11
$786,166
Total
TotalReceivablesPayablesEhhs-Hs Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 7 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Es-Admin
CAG-22-136 Diane Whaley - Agreement for Monitoring Services $20,000 $20,000 P 4/22/2022 12/31/2023
Contractor: (091520) WHALEY LAW FIRM PLLC
Women Owned
4/22/2022
CAG-22-183 AppleOne Employment Services - Agreement for Temporary Hire Services $30,000 $30,000 P 5/24/2022 12/21/2023
Contractor: (005219) APPLEONE EMPLOYMENT SVCS
Minority Owned, Women Owned
5/24/2022
Adden #1-22 - AppleOne Employment Services - extension of contract for
temporary hire services (New Expiration Date: 12/31/2023)
$0Addendum Adden #1-22 11/21/2022
3
$50,000
3
$50,000
Total
TotalPayablesEs-Admin Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 8 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Es-Cc
CAG-22-001 Avidex Industries, LLC - AV System technology upgrades in Council
Chambers and Video Booth
$297,218 $351,123 P 1/13/2022 12/31/2023
Contractor: (007002) AVIDEX INDUSTRIES LLC
1/13/2022
CO #1-22 - Avidex Industries - add cost of Contract Bond total (New
Expiration Date: 04/30/2022)
$2,596Addendum CO #1-22 2/23/2022
CO #2-22 - Avidex Industries - adjust monitor type, and adjust monitor
heights in conference room. (New Expiration Date: 04/30/2022)
$3,552Change CO #2-22 4/6/2022
CO #3-22 - Avidex Industries, LLC - Add display to the rear wall of
Council Chambers, add equipment to 7th Floor Conferencing center.
(New Expiration Date: 12/31/2023)
$47,757Change CO #3-22 12/21/2022
4
$351,123
4
$351,123
Total
TotalPayablesEs-Cc Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 9 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Es-Comm
CAG-20-428 Bradley Law, LLC - Cable TV Franchise Management Consulting Services $20,000 $60,000 P 11/16/2020 12/31/2023
Contractor: (011181) BRADLEY BERKLAND HAGEN HERBST
11/16/2020
Adden #1-23 - BRADLEY BERKLAND HAGEN HERBST - Additional
compensation and time extension through 2023 (New Expiration Date:
12/31/2023)
$40,000Addendum Adden #1-23 1/23/2023
CAG-21-222 Tripepi Smith & Assoc - Agreement for Communications Services $75,000 $75,000 P 9/23/2021 12/31/2023
Contractor: (082700) TRIPEPI SMITH ASSOCIATES INC
9/23/2021
Adden #1-22 - Tripepi Smith - additional compensation and time
extension (New Expiration Date: 12/31/2023)
$0Addendum Adden #1-22 12/5/2022
CAG-22-111 Cassia Creations - agreement for graphic design services $25,000 $25,000 P 4/14/2022 12/31/2023
Contractor: (014280) CASSIA CREATIONS
Women Owned
4/14/2022
Adden #1-22 - Cassia Creations - Graphic design services - time
extension (New Expiration Date: 12/31/2023)
$0Addendum Adden #1-22 12/5/2022
CAG-23-122 Rhay Design - Agreement for graphic design services $20,000 $20,000 P 4/3/2023 12/31/2023
Contractor: (068179) RHAY DESIGN LLC
4/3/2023
7
$180,000
7
$180,000
Total
TotalPayablesEs-Comm Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 10 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Es-Em
CAG-23-072 WA State Military Dept - Emergency Management Division - 2022
Emergency Management Performance Grant (E23-151) -
6/12/2022-9/30/2023 ($63,547 Rev)
$63,547 $63,547 R 4/12/2023 9/30/2023
Contractor: UNKNOWN VENDOR
4/12/2023
1
$63,547
1
$63,547
Total
TotalReceivablesEs-Em Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 11 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Es-It
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 12 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Es-It
CAG-14-011 Various Cities - MOU for planning, funding, implementation of a Joint
Human Services application/funding program
$1,000 $3,000 P 1/30/2014 12/31/2023
Contractor: (040752) CITY OF KENT
1/30/2014
Adden #1-11 - City of Kent - Annual Maintenance renewal for Share1App
(1/1/22-12/31/22)
$1,000Addendum2/7/2022
Adden #2-23 - City of Kent - Annual Maintenance of Share1App between
01/01/2023 and 12/31/2023 (New Expiration Date: 12/31/2023)
$1,000Addendum Adden #2-23 2/16/2023
CAG-16-110 Reliance Communications - Website Redesign $160,100 $179,195 P 6/29/2016 7/25/2023
Contractor: (090419) INTRADO INTERACTIVE SVCS CORP
6/29/2016
Adden #1-22 - Intrado Interactive Svcs Corp - Annual Maintenance
Renewal for CivicLive CMS between 07/26/2022 and 07/25/2023. (New
Expiration Date: 07/25/2023)
$19,095Addendum Adden #1-22 7/26/2022
CAG-16-213 WEBQA, Inc. - WebQA Master Service Agreement $19,350 $88,686 P 12/19/2016 12/14/2023
Contractor: (030815) GRANICUS LLC
12/19/2016
Adden #1-18 - additional service agreement $750 for 2018 & $1,500 for
2019 and time extension until 12/31/2019
$2,250Addendum Adden #1-18 6/12/2018
Adden #2-19 - additional service agreement $750 for 2018 & $1,500 for
2019 and time extension until 12/31/2019
$5,000Change Adden #2-19 9/22/2019
Adden #3-21 - GovQA, LLC - Annual Maintenance for GovQA System
(12/15/2021-12/14/2022) (New Expiration Date: 12/14/2022)
$26,496Addendum Adden #3-21 12/6/2021
Adden #4-22 - Granicus LLC - Annual Software Maintenance Renewal
with Granicus, 12/15/22 - 12/14/23 (New Expiration Date: 12/14/2023)
$25,990Addendum Adden #4-22 12/15/2022
CAG-17-152 Dude Solutions, Inc - Work Management Software $116,774 $214,238 P 7/13/2017 12/31/2023
Contractor: (022353) BRIGHTLY SOFTWARE INC
7/13/2017
Adden #1-21 - Dude Solutions - Annual Maintenance Renewal
(1/1/2022-12/31/2022) (New Expiration Date: 12/31/2022)
$46,412Addendum Adden #1-21 12/21/2021
Adden #2-22 - Brightly Software Inc - Annual Maintenance Renewal for
Brightly (formerly Dude Solutions), 01/01/2023 - 12/31/2023 (New
Expiration Date: 12/31/2023)
$51,053Addendum Adden #2-22 1/1/2023
CAG-18-260 Intradyn, Inc. - Email Archival System Products & Services $31,673 $98,433 P 12/3/2018 12/3/2023
Contractor: (038531) INTRADYN
12/3/2018
Adden #1-21 - Intradyn - Email Archival System - corrected end date and
maintenance payment of $3,874.50 (included in original contract amount);
Addendum term expires 12/02/2022. (New Expiration Date: 12/03/2023)
$0Addendum Adden #1-21 11/8/2021
Adden #2-22 - Intradyn - Adding social media archiving services to
contract (New Expiration Date: 12/03/2023)
$6,000Addendum Adden #2-22 10/17/2022
Adden #3-22 - Intradyn - Scope of work amendment as specified in
Exhibits A-3 and B-3 (New Expiration Date: 12/03/2023)
$60,760Addendum Adden #3-22 12/30/2022
CAG-19-323 Tyler Technologies Inc - Brazos Parking Citation System $29,746 $39,707 P 11/6/2019 11/30/2023
Contractor: (023171) TYLER TECHNOLOGIES INC
11/6/2019
Adden #1-22 - Tyler Technologies - Annual Maintenance Renewal
12/1/2020 - 11/30/2021 (New Expiration Date: 11/30/2021)
$2,976Addendum Adden #1-22 5/5/2022
Adden #1-22 - Tyler Technologies - Annual Maintenance Renewal
12/1/2021 - 11/30/2022 (New Expiration Date: 11/30/2022)
$3,133Addendum Adden #2-22 5/5/2022
Adden #3-23 - Tyler Technologies - additional Software and Licenses
added to Tyler Technologies' Brazos Interface (no add'l cost) (New
Expiration Date: 11/30/2023)
$0Addendum Adden #3-23 2/14/2023
Adden #4-23 - Tyler Technologies - Annual Maintenance Renewal of
Brazos eCitation System, 12/01/2022 - 11/30/2023 (New Expiration Date:
11/30/2023)
$3,852Addendum Adden #4-23 3/6/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 13 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Es-It
CAG-19-336 Motorola Solutions, Inc. - Transfers ownership of Public Enginers contract
to Motorola - Yearly maintenance is $3,300.00 - 25 years ($82,500)
CrimeReports.com - Motorola Solutions, Inc. - Transfers ownership of
CrimeReports.com from Public Engineers contract to Motorola - Yearly
maintenance is $3,300.00 - 25 years ($82,500)
$82,500 $92,406 P 12/14/2018 10/4/2023
Contractor: (051512) MOTOROLA INC
12/14/2018
Adden #1-21 - Motorola Solutions Inc - CrimeReports annual
maintenance renewal 2020 (New Expiration Date: 10/04/2021)
$3,300Addendum Adden #1-21 10/22/2021
Adden #2-21 - Motorola Solutions Inc - CrimeReports annual
maintenance renewal 2021 (New Expiration Date: 10/04/2022)
$3,303Addendum Adden #2-21 10/22/2021
Adden #3-22 - Motorola Solutions, Inc - Annual Maintenance Renewal of
CrimeReports.com, 10/05/2022 - 10/04/2023 (New Expiration Date:
10/04/2023)
$3,303Addendum Adden #3-22 10/5/2022
CAG-20-154 Insight Public Sector - Microsoft 365 Licenses $228,226 $684,678 P 9/1/2020 8/31/2023
Contractor: (016972) INSIGHT PUBLIC SECTOR INC
9/1/2020
Adden #1-22 - Insight Public Sector - added amount as a correction only
to original contract (total amount should be $912,904.20). (New
Expiration Date: 08/31/2023)
$684,678Addendum Adden #1-22
Adden #1-22a - corrected amount (total original contract amount should
be $684,678.15). (New Expiration Date: 10/31/2023)
$-228,226Addendum Adden #1-22a 8/9/2022
CAG-20-496 Bluebeam, Inc - Software License for Bluebeam Studio Prime $2,400 $4,976 P 12/17/2020 7/21/2023
Contractor: (012984) CADD MICROSYSTEMS INC
12/17/2020
Adden #1-22 - CADD MICROSYSTEMS INC - Annual Maintenance
Renewal for Bluebeam Studio Prime between 7/22/2022 and 7/21/2023
(New Expiration Date: 07/21/2023)
$2,576Addendum Adden #1-22 6/7/2022
CAG-21-189 Vincent Jessel - Veoci Airport Management System $18,222 $24,497 P 7/30/2021 7/29/2023
Contractor: (088191) VEOCI INC
Minority Owned
7/30/2021
Adden #1-22 - Veoci Inc - Annual maintenance renewal fo Veoci Airport
Management System between 7/30/2022 and 7/29/2023 (New Expiration
Date: 07/29/2023)
$6,276Addendum Adden #1-22 7/5/2022
CAG-21-209 Miller Mendel, Inc - eSOPH Software as-a Service (SaaS) for Police Dept $11,538 $18,111 P 8/25/2021 8/12/2023
Contractor: (049520) MILLER MENDEL INC
8/25/2021
Adden #1-22 - Miller Mendel, Inc - Annual Maintenance renewal of
eSOPH service for 8/20/2022 to 8/19/2023 (New Expiration Date:
08/12/2023)
$6,573Addendum Adden #1-22 9/1/2022
CAG-21-217 Carahsoft/Salesforce - Software as a Service (Cloud) Salesforce for HRAP,
EHHS/HS Dept ($9,336.30 payable - processed separately outside of
contract).
$0 $18,775 P 9/1/2016 8/31/2023
Contractor: (013578) CARAHSOFT TECHNOLOGY CORP
9/1/2016
Adden #1-21 - Carahsoft/Salesforce - Contract renewal for software as a
service for HRAP, EHHS/HS Dept (New Expiration Date: 08/31/2022)
$9,387AddendumAdden #1-21 9/1/2021
Adden #2-22 - Carahsoft Technology Corp - annual maintenance renewal
for Salesforce between 09/01/2022 and 08/31/2023. (New Expiration
Date: 08/31/2023)
$9,387Addendum Adden #2-22 9/6/2022
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 14 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Es-It
CAG-21-226 LEFTA Systems - Software as a Service for PD Personnel and Training
Records
$10,724 $21,857 P 10/1/2021 9/30/2023
Contractor: (038080) INTL BUSINESS INFORMATION TECH
10/1/2021
Adden #1-22 - LEFTA Systems - Annual maintenance renewal for
10/01/2022 - 09/30/2023 (New Expiration Date: 09/30/2023)
$10,032Addendum Adden #1-22 9/6/2022
Adden #2-22 - LEFTA Systems - add an additional LEFTA application for
Police Staff Services. (New Expiration Date: 09/30/2023)
$1,101Addendum Adden #2-22 10/11/2022
CAG-21-255 StreetScan, Inc. - Transportation Access to Streetlogix Asset Management
Module and associated Data Hosting
$19,000 $35,500 P 10/25/2021 9/14/2023
Contractor: (078464) STREETSCAN INC
10/25/2021
Adden #1-22 - Streetscan - Annual StreetLogix platform renewal for
Transportation (9/15/2022-9/14/2023) (New Expiration Date: 09/14/2023)
$16,500Addendum Adden #1-22 9/8/2022
CAG-21-268 Aspect Software, Inc - Voxeco Prophecy Licenses for CED IVR Phone
Inspection ($2,804.40 payable - not submitted through Clerk Office)
$0 $1,334 P 10/1/2012 11/30/2023
Contractor: (006076) ALVARIA INC
10/1/2012
Adden #1-21 - Aspect Software, Inc - Annual Software Maintenance for
Alvaria CXP IVR Software (New Expiration Date: 11/30/2022)
$654Addendum Adden #1-21 11/22/2021
Adden #2-22 - Alvaria, Inc. - Annual Software Maintenance Renewal for
Alvaria CXP IVR Software (New Expiration Date: 11/30/2023)
$681Addendum Adden #2-22 12/1/2022
CAG-21-275 Diligent Corporation - iCompass Meeting Manager Software to manage
Agenda Bills (assigning CAG# for original 2007 contract - $12,500 payable
not processed through Clerk's Office)
$0 $40,139 P 12/20/2007 12/31/2023
Contractor: (021264) DILIGENT CORPORATION
12/20/2007
Adden #1-21 - Diligent Corporation - Annual Maintenance Renewal for
iCompass FilePro Meeting Manager (New Expiration Date: 12/31/2022)
$19,773Addendum Adden #1-21 12/6/2021
Adden #2-22 - DILIGENT CORPORATION - Annual maintenance of
Meeting Manager (formerly iCompass), 01/01/2023 - 12/31/2023 (New
Expiration Date: 12/31/2023)
$20,366Addendum Adden #2-22 1/1/2023
CAG-21-319 Industrial Software Solutions - Annual maintenance renewal for AVEVA
Historian and HMI SCADA System
$12,942 $26,661 P 12/21/2021 12/31/2023
Contractor: (037302) INDUSTRIAL SOFTWARE SOLUTIONS
12/21/2021
Adden #1-22 - Industrial Software Solutions - Annual maintenance
renewal for AVEVA Historian SCADA System (1/1/2023 - 12/31/2023)
(New Expiration Date: 12/31/2023)
$13,718Addendum Adden #1-22 11/18/2022
CAG-22-036 Quadrant Systems LLC - Annual Support Agreement for Quadrant Systems
RASWIN Cashiering System
$2,312 $4,762 P 2/7/2022 12/31/2023
Contractor: (065104) QUADRANT SYSTEMS LLC
2/7/2022
Adden #1-22 - Quadrant Systems LLC - Annual Maintenance Renewal of
RASWIN Cashiering Systems, 01/01/2023 - 12/31/2023 (New Expiration
Date: 12/31/2023)
$2,450AddendumAdden #1-22 12/12/2022
CAG-22-276 Transoft Solutions - AutoTURN Software purchase ($2959 - original
contract not submitted through Clerk's Office)
$0 $578 P 8/4/2020 7/31/2023
Contractor: (082350) TRANSOFT SOLUTIONS (U.S.) INC
8/4/2020
Adden #1-22 - Transoft Solutions - Annual Maintenance Renewal for
AutoTURN Software (New Expiration Date: 07/31/2023)
$578Addendum Adden #1-22 8/22/2022
CAG-22-295 InfoWater and XPSWMM Software Purchase (original contract was not
submitted through Clerk's Office)
$0 $14,236 P 8/31/2022 10/16/2023
Contractor: (093227) INNOVYZE INCORPORATED
8/31/2022
Adden # 1-22 - Innovyze - annual maintenance renewal for InfoWater and
XPSWMM (Term: 10/17/2022 - 10/16/2023) (New Expiration Date:
10/16/2023)
$14,236Addendum Adden #1-22 8/31/2022
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 15 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Es-It
CAG-22-318 Progress Software Corp - DevCraft Telerik Software (original contract not
submitted through Clerk's Office)
$0 $825 P 9/20/2013 9/20/2023
Contractor: (063678) PROGRESS SOFTWARE CORPORATIO
9/20/2013
Adden #1-22 - Progress Software Corp - Annual maintenance renewal for
DevCraft Telerik license between 09/21/2022 and 09/20/2023 (New
Expiration Date: 09/20/2023)
$825Addendum Adden #1-22 9/21/2022
CAG-22-340 CenturyLink Sales Solutions, Inc. (Lumen) - ISDN PRS, DSS (PRI)
Telephone Service Agreement (Term: 10/23/22 - 10/23/23)
$7,000 $7,000 P 10/23/2022 10/23/2023
Contractor: (065185) CENTURYLINK
10/23/2022
CAG-22-348 G12 Communications - SIP line for phones (original contract not processed
through Clerk's Office)
$0 $22,700 P 3/25/2020 12/31/2023
Contractor: (068268) G12 COMMUNICATIONS LLC
3/25/2020
Adden #1-22 - G12 Communications - Additional SIP line for phones
(New Expiration Date: 08/17/2023)
$7,700Addendum Adden #1-22 8/17/2022
Adden #2-23 - G12 COMMUNICATIONS LLC - Authorization for G12 to
port 28 of 100 lines per original contract. (New Expiration Date:
08/17/2023)
$0Addendum Adden #2-23 3/28/2023
Adden #3-23 - G12 COMMUNICATIONS LLC - Addition of funds for
processing SIP telephone service monthly invoices (New Expiration Date:
12/31/2023)
$15,000Addendum Adden #3-23 5/2/2023
CAG-22-350 IVOXY Consulting - License purchase/renewal of M365 data protection. $10,000 $10,000 P 11/2/2022 11/1/2023
Contractor: (038692) IVOXY CONSULTING INC
11/2/2022
CAG-22-352 StoneShare Corp - M365 Sharepoint Online Implementation Professional
Services
$42,000 $42,000 P 11/1/2022 12/31/2023
Contractor: (078458) STONESHARE CORPORATIION
11/1/2022
CAG-22-358 Plante & Moran - Information Technology Strategic Plan $131,000 $131,000 P 11/2/2022 12/31/2023
Contractor: (062194) PLANTE & MORAN, PLLC
11/2/2022
CAG-22-369 Ivoxy Consulting - Evergreen support for Pure Storage Support Renewal
(12/07/2022 - 12/06/2023)
$46,920 $46,920 P 11/29/2022 12/6/2023
Contractor: (038692) IVOXY CONSULTING INC
11/29/2022
CAG-22-370 Interview Now Inc - InterviewNow SMS recruiting tool for the Police
Department hiring process
$8,000 $8,000 P 11/18/2022 11/30/2023
Contractor: (037937) INTERVIEW NOW INC
Minority Owned
11/18/2022
CAG-22-397 INSIGHT PUBLIC SECTOR INC - One Year of Pluralsight Business
Professional for training IT Staff
$11,441 $11,441 P 12/15/2022 12/11/2023
Contractor: (016972) INSIGHT PUBLIC SECTOR INC
12/15/2022
CAG-22-398 CDW-Government - Annual FireWall Service and Support for our Palo Alto
NGFW, 12/19/2022 - 12/19/2023
$27,823 $27,823 P 12/19/2022 12/19/2023
Contractor: (014396) CDW GOVERNMENT LLC
12/19/2022
CAG-23-012 Right! Systems - Annual Network Switch Service and Support for some of
our Juniper Networks Hardware (12/17/2022 - 12/17/2023)
$12,929 $12,929 P 1/13/2023 12/17/2023
Contractor: (068463) RIGHT SYSTEM INC
1/13/2023
CAG-23-018 Annual Renewal of FireEye Netwrok Security Licensing and Support,
01/01/23 - 12/31/23
$17,066 $17,066 P 1/18/2023 12/31/2023
Contractor: (014396) CDW GOVERNMENT LLC
1/18/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 16 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Es-It
CAG-23-033 IVOXY CONSULTING INC - HCI Deployment Services $8,276 $8,276 P 2/2/2023 12/31/2023
Contractor: (038692) IVOXY CONSULTING INC
2/2/2023
Adden #1-23 - IVOXY CONSULTING INC - Expiration date extension
(New Expiration Date: 12/31/2023)
$0Addendum Adden #1-23 6/13/2023
CAG-23-036 Range Servant America - Golf Course Golf Ball Dispenser with Supporting
Software
$36,070 $36,070 P 2/8/2023 12/31/2023
Contractor: (065742) RANGE SERVANT AMERICA
2/8/2023
CAG-23-085 Griffeye, Inc - Annual Renewal of Griffeye Analyze DI Pro Software (initial
CAG set-up/no payable amount)
$0 $0 P 3/20/2023 7/5/2023
Contractor: (031670) GRIFFEYE INCORPORATED
3/20/2023
CAG-23-086 Magnet Forensics - Annual renewal of Magnet Forensics AXIOM software
(initial CAG set-up/no payable amount)
$0 $0 P 3/20/2023 12/31/2023
Contractor: (046284) MAGNET FORENSICS USA INC
3/20/2023
CAG-23-087 KSA Dynamics - Agreement for training services $15,000 $15,000 P 3/20/2023 12/31/2023
Contractor: (067228) KSA DYNAMICS LLC
3/20/2023
CAG-23-099 State33, Inc DBA Manage My Market - Agreement for Manage My Market
software for the Renton Farmers Market
$900 $900 P 3/20/2023 12/31/2023
Contractor: (046707) STATE33 INCORPORATED
3/20/2023
CAG-23-147 AXON ENTERPRISE INC - Annual Renewal of Axon Input Ace, 10/01/2022
- 09/30/2023
$0 $0 P 4/21/2023 9/30/2023
Contractor: (080094) AXON ENTERPRISE INC
4/21/2023
CAG-23-199 RIGHT SYSTEM INC - Edge Router Replacement Services $11,000 $11,000 P 5/19/2023 9/1/2023
Contractor: (068463) RIGHT SYSTEM INC
5/19/2023
CAG-98-022 New World Systems Corporation - Purchase agreement for Police Dept.
computer information system and hardware
$716,273 $1,150,415 P 3/5/1998 11/30/2023
Contractor: (023171) TYLER TECHNOLOGIES INC
3/5/1998
Adden #1-06 - New World Systems - upgrading the existing PD AS 400
Records System to the new Windows platform (Prevous Expiration Date:
09/01/2012 and New Expiration Date: 09/01/2012)
$218,800Addendum Adden #1-06 12/19/2006
Adden #2-22 - Tyler Technologies - Professional Services to upgrade
New World Systems to version 2022.1 and ESRI 10.8. (New Expiration
Date: 03/31/2023)
$17,352Addendum Adden #2-22 5/31/2022
Adden #5-22 - Tyler Technologies, Inc - Annual Maintenance Renewal for
New World Systems between 09/01/2022 and 08/31/2023. NOTE: see
CAG-05-151 for Adden #3 and #4 (merged with this contract). (New
Expiration Date: 08/31/2023)
$167,930Addendum Adden #5-22 9/1/2022
Adden #6-23 - TYLER TECHNOLOGIES INC - Additional Software and
Licenses for New World Systems NCIC Module (no add'l cost for this
Addendum) (New Expiration Date: 11/30/2023)
$0Addendum Adden #6-23 2/1/2023
Adden #7-23 - Tyler Technologies Inc - Addition of Licenses and Services
for Orders of Protection (New Expiration Date: 11/30/2023)
$30,060Addendum Adden #7-23 3/6/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 17 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
88
$3,171,133
88
$3,171,133
Total
TotalPayablesEs-It Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 18 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Es-Od
CAG-21-332 Aperture EQ - Agreement for Leadership Team Training $15,000 $30,000 P 12/30/2021 12/31/2023
Contractor: (005117) APERTURE EQ
Women Owned
12/30/2021
Adden #1-22 - Aperture EQ - Extension of agreement for leadership
training (New Expiration Date: 12/31/2023)
$15,000Addendum Adden #1-22 11/22/2022
CAG-22-420 COMENGAGE LLC - Providing services for City-Wide Community Survey
in 2023
$60,000 $70,000 P 1/3/2023 12/31/2023
Contractor: (016224) COMENGAGE LLC
Women Owned
1/3/2023
Adden #1-23 - COMENGAGE LLC - Adding additional translation
languages for Community Survey; adding business survey (New
Expiration Date: 12/31/2023)
$10,000Addendum Adden #1-23 6/2/2023
CAG-22-421 MANAGING DYNAMICS LLC - Providing "Renton 101" and other
professional development trainings available to city employees
$15,000 $15,000 P 12/23/2022 12/31/2023
Contractor: (046709) MANAGING DYNAMICS LLC
Women Owned
12/23/2022
CAG-23-006 Technology Learning Group Inc - Agreement for providing technology
training (specifically "Tech Tuesdays" programs/offerings coordinated by
Org. Development) available for all city staff
$15,000 $15,000 P 12/23/2022 12/31/2023
Contractor: (055156) TECHNOLOGY LEARNING GROUP INC
12/23/2022
6
$130,000
6
$130,000
Total
TotalPayablesEs-Od Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 19 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Executive
CAG-22-355 Foster Government Relations - Provide legislative and governmental affairs
services for state, regional and federal interests
$77,000 $77,000 P 11/1/2022 12/31/2023
Contractor: (027105) FOSTER GOVERNMENT RELATIONS
11/1/2022
CAG-23-029 OUTCOMES BY LEVY LLC - Legislative and governmental affairs services $50,000 $50,000 P 2/13/2023 12/31/2023
Contractor: (058621) OUTCOMES BY LEVY LLC
2/13/2023
2
$127,000
2
$127,000
Total
TotalPayablesExecutive Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 20 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Finance
CAG-15-245 WA State Department of Revenue - Data Sharing Agreement for
Tax/Licensing Information
$0 $0 M 10/21/2015 10/20/2023
Contractor: UNKNOWN VENDOR
10/21/2015
Adden #1-21 - WA Department of Revenue - time extension (New
Expiration Date: 10/21/2022)
$0Addendum Adden #1-21 7/15/2021
Adden #2-22 - WA State Department of Revenue - Time extension (New
Expiration Date: 10/20/2023)
$0Addendum Adden #2-22 12/2/2022
CAG-18-038 Tax Recovery Services (TRC) LLC - Tax Audit Services $40,000 $40,000 P 2/28/2018 12/31/2023
Contractor: (080150) TAX RECOVERY SERVICES INC
2/28/2018
Adden #1-19 - Tax Recovery Services LLC - Contract extension (New
Expiration Date: 12/31/2020)
$0Addendum Adden #1-19 11/6/2019
Adden #2-21 - Tax Recovery Services - time extension (New Expiration
Date: 12/31/2021)
$0Addendum Adden #2-21 1/4/2021
Adden #3-23 - TAX RECOVERY SERVICES LLC - Tracfone Wireless
audit and investigation services (New Expiration Date: 12/31/2023)
$0Addendum Adden #3-23 1/9/2023
CAG-20-448 Daizy Logik LLC - Agreement for Praxis Support Services $45,000 $45,000 P 11/23/2020 12/31/2023
Contractor: (019812) DAIZY LOGIK LLC
11/23/2020
CAG-21-157 Pacifica Law Group - B&O Tax Legal Services $90,000 $90,000 P 6/15/2021 12/31/2023
Contractor: (059960) PACIFICA LAW GROUP LLP
6/15/2021
CAG-23-062 Milliman, Inc - Actuarial services for the City $30,000 $30,000 P 3/3/2023 12/31/2023
Contractor: (049805) MILLIMAN INC
3/3/2023
7
$205,000
3
$0
10
$205,000
Total
TotalMiscellaneousPayablesFinance Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 21 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Hrrm
CAG-20-013 Public Safety Testing, Inc - Written & Physical Ability Testing for Police
Officer/Law Enforcement candidates
$22,864 $52,816 P 10/18/2019 7/1/2023
Contractor: UNKNOWN VENDOR
10/18/2019
Adden #1-22 - Public Safety Testing (PST) - increases in price rates for
services (New Expiration Date: 07/01/2023)
$29,952Addendum Adden #1-22 7/27/2022
CAG-22-019 Summit Law Group, PLLC - Agreement for Legal Consultation and Advice $35,000 $50,000 P 8/5/2021 12/31/2023
Contractor: (078794) SUMMIT LAW GROUP PLLC
8/5/2021
Adden #1-22 - Summit Law Group, PLLC - extends term to 12/31/2023,
adds Exhibit of rates, increases payables to $50,000 (New Expiration
Date: 12/31/2023)
$15,000Addendum Adden #1-22 1/1/2023
CAG-22-213 Renton Police Guild - 2021-2023 Collective Bargaining Agreement for City
of Renton commissioned police officers and sergeants
$0 $0 M 6/15/2022 12/31/2023
Contractor: UNKNOWN VENDOR
6/15/2022
CAG-22-220 Alliant Insurance Services - Insurance policy for City's Property, Pollution,
and Cyber insurance coverage for the period of July 1, 2022 - July 1, 2023
$944,498 $944,498 P 7/1/2022 7/1/2023
Contractor: (001910) ALLIANT INSURANCE SERVICES
7/1/2022
CAG-22-321 Symetra - Excess loss insurance (stop loss insurance) for high cost claims
to the city's medical plan.
$0 $0 M 1/1/2023 12/31/2023
Contractor: UNKNOWN VENDOR
1/1/2023
CAG-22-342 Police Guild Non-Commissioned - 2021-2023 Labor contract between
Police Guild, Non-Commissioned Employees, and City of Renton
$0 $0 M 10/20/2022 12/31/2023
Contractor: UNKNOWN VENDOR
10/20/2022
CAG-22-359 Gallagher Benefit Services - Healthcare broker and consultant services -
oversight and administration services regarding employee healthcare
coverage
$90,900 $90,900 P 1/1/2023 12/31/2023
Contractor: (028347) GALLAGHER BENEFIT SERVICES INC
1/1/2023
CAG-22-366 Kaiser Permanente - Premium rate increase for Kaiser Permanente's
healthcare plan for city employees.
$0 $0 M 1/1/2023 12/31/2023
Contractor: UNKNOWN VENDOR
1/1/2023
CAG-22-367 HMA - Healthcare Management Administrators, Inc - Agreement for
ongoing healthcare management services for city employees, and the 2023
HMA Administrative Fee Schedule
$0 $0 M 1/1/2023 12/31/2023
Contractor: UNKNOWN VENDOR
1/1/2023
CAG-22-403 ALLIANT INSURANCE SERVICES- 2023 Liability Insurance package -
excess liability, workers' compensation, pollution, airport liability and
unmanned aircraft renewal
$682,776 $682,776 P 1/1/2023 12/31/2023
Contractor: (001910) ALLIANT INSURANCE SERVICES
1/1/2023
CAG-23-023 Aperture EQ - Administer the 2023 Police Commander Work Rating and
promotional exam via an Assessment Center
$15,000 $15,000 P 1/23/2023 7/1/2023
Contractor: (005117) APERTURE EQ
Women Owned
1/23/2023
8
$1,835,990
5
$0
13
$1,835,990
Total
TotalMiscellaneousPayablesHrrm Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 22 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Judicial
CAG-23-060 Washington State Court Administrator - Agreement between researchers &
Trial Courts regarding participation in Statewide Jury Study
$0 $0 M 3/3/2023 12/31/2023
Contractor: UNKNOWN VENDOR
3/3/2023
1
$0
1
$0
Total
TotalMiscellaneousJudicial Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 23 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Police
CAG-21-126 Edward Byrne Memorial Justice Assistance Grant (JAG) FY 2020 Local
Solicitation - 2020 FY JAG ($31,613)
$31,613 $31,613 R 5/12/2021 9/30/2023
Contractor: UNKNOWN VENDOR
5/12/2021
CAG-22-170 Kenyon Disend, PLLC - Provide legal services to COR to prosecute the
seizure and intended forfeiture of property claimed by Lei and Li
$35,000 $70,000 P 4/7/2022 12/31/2023
Contractor: (040841) KENYON DISEND, PLLC
4/7/2022
Adden #1-23 - Kenyon Disend, PLLC. - Amending contract with a time
extension (New Expiration Date: 12/31/2023)
$35,000Addendum Adden #1-23 3/10/2023
CAG-22-360 Washington Traffic Safety Commission - To provide funding for the law
enforcement agencies in WTSC Region 7 & 8 to conduct straight time or
overtime enforcement activities (traffic safety emphasis patrols) as outlined
in the Statement of Work, in support of Target Zero priorities. The city of
Renton will receive $17,000 of the allocated funds for this region.
$17,000 $17,000 R 12/1/2022 9/30/2023
Contractor: UNKNOWN VENDOR
12/1/2022
CAG-22-387 Washington State Criminal Justice Training Commission - grant agreement
with the Washington State Criminal Justice Training Commission, to accept
$30,000 in grant funds for the purpose of funding an Officer Wellness
Check-In program.
$30,000 $30,000 R 12/29/2022 12/31/2023
Contractor: UNKNOWN VENDOR
12/29/2022
CAG-23-161 OCDETF SLOT Agreement - State and Local overtime and authorized
expense/strategic initiative. Investigators anticipate that his investigation
will last for the duration of FY 2023. Rec $20,000
$20,000 $20,000 R 5/3/2023 9/30/2023
Contractor: UNKNOWN VENDOR
5/3/2023
CAG-23-212 Washington Traffic Safety commission - 2023-AG-4859- King County
Distracted Driving Campaign (REC: $2,500.00)
$2,500 $2,500 R 6/2/2023 9/30/2023
Contractor: UNKNOWN VENDOR
6/2/2023
2
$70,000
5
$101,113
7
$171,113
Total
TotalReceivablesPayablesPolice Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 24 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Pr-Admin
CAG-18-078 The Riley Group - Geotechnical Services for Family First Community
Center
$7,950 $32,215 P 5/9/2018 12/31/2023
Contractor: (068472) RILEY GROUP INC
5/9/2018
Adden #1-20 - The Riley Group -provide geotechnical inspections for
Family First Community Center (New Expiration Date: 12/31/2021)
$16,265Addendum Adden #1-20 1/15/2020
Adden #2-22 - The Riley Group - Time Exension (New Expiration Date:
12/31/2023)
$0Addendum Adden #2-22 2/1/2022
Adden #3-22 - The Riley Group - Add fees for inspections (New
Expiration Date: 12/31/2023)
$5,000Addendum Adden #3-22 5/26/2022
Adden #4-22 - The Riley Group - Additional fee for inspections and final
letter (New Expiration Date: 12/31/2023)
$3,000Addendum Adden #4-22 12/12/2022
5
$32,215
5
$32,215
Total
TotalPayablesPr-Admin Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 25 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Pr-Golf
CAG-23-242 ALL STRIPES LLC - Maplewood Golf Course (MWGC) Red Line &
Handicap Striping
$5,455 $5,455 P 6/21/2023 9/30/2023
Contractor: (001992) ALL STRIPES LLC
6/21/2023
1
$5,455
1
$5,455
Total
TotalPayablesPr-Golf Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 26 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Pr-Parks
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 27 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Pr-Parks
CAG-10-092 Seattle Public Utilities - Memorandum of Agreement - Cedar River Access
Facility & Broodstock collection facility on city properties
$0 $0 M 7/12/2010 8/21/2023
Contractor: UNKNOWN VENDOR
7/12/2010
Adden #1-13 - Seattle Public Utilities - Memorandum of Agreement -
Cedar River Access Facility & Brookstock Collection - 10 year extension
(Prevous Expiration Date: 08/21/2013 and New Expiration Date:
08/21/2023)
$0Addendum Adden #1-13 8/7/2013
CAG-19-111 USDA APHIS Wildlife Services Program - Interlocal Agreement for
Waterfowl Mgmt Program
$11,000 $11,000 P 4/17/2019 12/31/2023
Contractor: (083655) USDA, APHIS; GENERAL
4/17/2019
CAG-19-145 The Boeing Company - License Agreement for access to Cedar River Trail
Park
$0 $0 M 5/3/2019 12/31/2023
Contractor: UNKNOWN VENDOR
5/3/2019
Adden #1-19 - Boeing Company - Apron B - Manhole Connection to King
County Sewer R01-42 (New Expiration Date: 12/31/2022)
$0Addendum Adden #1-19 7/2/2019
Adden #2-22 - The Boeing Company - permission to add a Portable
Outbuilding (New Expiration Date: 12/31/2022)
$0Addendum Adden #2-22 1/28/2022
Adden #3-22 - The Boeing Company - Extension to term of agreement for
Access to Cedar River Trail Park for Apron 'R' Construction Project (New
Expiration Date: 12/31/2023)
$0Addendum Adden #3-22 11/21/2022
CAG-20-079 WA State Department of Health - Point of sale incentives to SNAP clients
at the Renton Farmers Market
$7,500 $62,000 R 3/30/2020 12/31/2023
Contractor: (1255) WASHINGTON STATE
3/30/2020
Adden #1-21 - State of Washington Department of Health - additional
$5,000 in Grant funding for SNAP Match (New Expiration Date:
06/30/2021)
$5,000Addendum Adden #1-21 11/17/2020
Adden #2-21 - State of Washington Department of Health - additional
$22,000 in Grant funding and time extension (New Expiration Date:
12/31/2021)
$22,000AddendumAdden #2-21 4/14/2021
Adden #3-22 - WA State Department of Health - additional funding (New
Expiration Date: 12/31/2022)
$27,500Addendum Adden #3-22 2/23/2022
Adden #4-23 - WA State Dept of Health - $22,350 (rev) reimbursement for
SNAP Match Incentive (1/1/2023-12/31/2023) (New Expiration Date:
12/31/2023)
$0Addendum Adden #4-23 1/1/2023
CAG-20-139 FitLot - Partnership Agreement- AARP-sponsored Outdoor Fitness Park $0 $3,510 M 7/9/2020 12/31/2023
Contractor: UNKNOWN VENDOR
7/9/2020
Adden #1-21 - FitLot - Use of Grant for Annual Fitness Class funding &
one-time Social Media Support funding ($4,010 rev) (New Expiration
Date: 04/30/2022)
$0Addendum Adden #1-21 5/12/2021
Adden #2-22 - Fit Lot - Partnership Agreement- AARP-sponsored
Outdoor Fitness Park - Programming Grant (New Expiration Date:
12/31/2023)
$3,510Adden #2-22 11/8/2022
CAG-21-006 GeoEngineers - Design, Permitting & Construction Support for Cedar River
Trail Relocation & Bank Stabilization Project
$375,638 $375,638 P 1/11/2021 12/31/2023
Contractor: (029436) GEO ENGINEERS INC
1/11/2021
Adden #1-21 - GeoEngineers - Scope of Work amended to revise written
description of "trail relocation;" time of performance extended. (New
Expiration Date: 12/31/2023)
$0Addendum Adden #1-21 5/24/2021
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 28 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Pr-Parks
CAG-22-013 Terra Dynamics, Inc. - Kiwanis Park Improvements $4,780,000 $5,336,213 P 4/14/2022 7/31/2023
Contractor: (080368) TERRA DYNAMICS
4/14/2022
CO #1-22 - Terra Dynamics, Inc.- Changes in scope of work required for
unforseen conditions. Credit amount of (-$16,255.53) applied to contract.
Substantial completion date is January 9, 2023. (New Expiration Date:
01/31/2023)
$-16,256Change CO #1-22 12/1/2022
CO #2-23 - Terra Dynamics - Kiwanis Park Improvements - time
extension and additional scope of work required for unforeseen
conditions-change CB#206 (New Expiration Date: 03/31/2023)
$17,268Change CO #2-23 2/8/2023
CO #3-23 - Terra Dynamics - Storm Water Drainage addition for
neighborhood drainage connection, including all labor and materials.
(New Expiration Date: 03/31/2023)
$45,064Change CO #3-23 2/18/2023
CO #4-23 - Terra Dynamics - Signage modifications, RPA size
modifications, light post coupling modifications, and Extension of Contract
Time to May 31, 2023 (New Expiration Date: 05/31/2023)
$19,265Change CO #4-23 3/30/2023
CO #5-23 - TERRA DYNAMICS - Includes COP #20 thru COP #25 - see
attached Contract Change Order Agreement dated 5/19/2023 for details.
Extension of Contract Time to July 31, 2023. (New Expiration Date:
07/31/2023)
$14,818ChangeCO #5-23 5/24/2023
CAG-22-015 Active Construction Inc.- Philip Arnold Park Site Improvements $4,711,486 $4,935,226 P 7/13/2022 7/31/2023
Contractor: (000767) ACTIVE CONSTRUCTION INC
7/13/2022
CO #1-22 - Active Construction Inc. - Additional pedestrian detour scope
and time extension for Philip Arnold Park Improvements Project
$17,490Change11/4/2022
CO #1 (Corrected) - adding sales tax for pedestrican detour scope - Philip
Arnold Improvements Project (New Expiration Date: 07/17/2023)
$1,475Change CO #1 (Corrected 11/4/2022
CO #2-23 - ACTIVE CONSTRUCTION INC - Additional stormwater and
signage scope and time extension (New Expiration Date: 07/21/2023)
$27,498Change CO #2-23 2/14/2023
CO #3-23 - Active Construction Inc - Level spreader adjustments,
over-excavation, and junction box up-sizing, time extension (New
Expiration Date: 07/31/2023)
$29,344Change CO #3-23 3/15/2023
CO #4-23 - ACTIVE CONSTRUCTION INC - Change Order for gravel
borrow import to replace unsuitable native materials. (New Expiration
Date: 07/31/2023)
$32,253Change CO #4-23 3/20/2023
CO #5-23 - ACTIVE CONSTRUCTION INC - Change Order for RPBA
Supply and Stump Removal/Pier Reinstall (New Expiration Date:
07/31/2023)
$14,824Change CO #5-23 4/12/2023
CO #6-23 - ACTIVE CONSTRUCTION INC - Added gravel borrow and
native material removal (New Expiration Date: 07/31/2023)
$37,817Change CO #6-23 6/13/2023
CO #7-23 - ACTIVE CONSTRUCTION INC - Added playground survey
and ramp, irrigaiton sleeving, and shelter plinths (New Expiration Date:
07/31/2023)
$19,505Change CO #7-23 6/13/2023
CO#8-23 - Active Construction, Inc. - Change Order No. 8 for added soil
import/export and drainage connection at Philip Arnold Park. (New
Expiration Date: 07/31/2023)
$43,534Change CO #8-23 6/15/2023
CAG-22-385 King Conservation District - Member Jurisdiction Grant for Cedar River Trail
and Bank Stabilization Project ($53,811.00 rev)
$53,811 $53,811 R 12/5/2022 12/31/2023
Contractor: UNKNOWN VENDOR
12/5/2022
CAG-23-169 William G. Moss (Biff Moss) - Entertainment for Farmers Market $500 $500 P 5/3/2023 9/30/2023
Contractor: (043158) WILLIAM G MOSS
5/3/2023
CAG-23-170 AQUA TECHNEX LLC - Vegetation Management at Coulon and Kennydale
Beach Parks
$5,969 $5,969 P 5/8/2023 8/8/2023
Contractor: (005250) AQUA TECHNEX LLC
5/8/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 29 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Pr-Parks
CAG-23-183 AC MOATE INDUSTRIES - Parking Lot Striping at Coulon Park $32,627 $32,627 P 5/10/2023 7/10/2023
Contractor: (000098) AC MOATE INDUSTRIES
5/10/2023
CAG-23-184 Altus Traffic Management, LLC - Traffic Control Services to Close Logan
Ave S for Renton Farmers Market
$12,789 $12,789 P 5/15/2023 9/29/2023
Contractor: (006602) ALTUS TRAFFIC MANAGEMENT LLC
5/15/2023
CAG-23-219 King County Library System (KCLS) - Story Walk Program at Liberty Park
and Sunset Neighborhood Park. (June 1-30, 2023 at Liberty Park; July
1-31, 2023 at Sunset Neighborhood Park)
$0 $0 M 6/1/2023 8/1/2023
Contractor: UNKNOWN VENDOR
6/1/2023
PAG-23-001 The Boeing Company - License for Boeing to Decommission Wells at
Cedar River Trail Park and Renton Airport
$0 $0 M 2/27/2023 12/31/2023
Contractor: UNKNOWN VENDOR
2/27/2023
23
$10,709,963
6
$115,811
11
$3,510
40
$10,829,284
Total
TotalMiscellaneousReceivablesPayablesPr-Parks Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 30 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Pr-Ppnr
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 31 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Pr-Ppnr
CAG-19-360 Hough Beck & Baird - Design & construction admin support for Philip
Arnold Park site improvements
$392,829 $540,408 P 12/12/2019 8/31/2023
Contractor: (035300) HOUGH BECK & BAIRD INC
Disadvantaged Business, Women Owned
12/12/2019
Adden #1-21 - HBB Landscape Architecture (Hough Beck & Baird Inc) -
Additional professional design services for Philip Arnold Park site
improvements and signage (New Expiration Date: 12/31/2022)
$47,796Addendum Adden #1-21 1/20/2021
Adden #2-21 - HBB Landscape Architecture (Hough Beck & Baird Inc) -
additional professional design services for Philip Arnold Park site
improvements (New Expiration Date: 06/01/2023)
$4,557Addendum Adden #2-21 11/10/2021
Adden #3-22 - Hough Beck & Baird, Inc - Additional professional design
services for Philip Arnold Park Site Improvements (New Expiration Date:
06/01/2023)
$26,683Addendum Adden #3-22 3/15/2022
Adden #4-22 - Hough Beck & Baird, Inc - Provide additional professional
construction administration services for the Philip Arnold Park Site
improvements. (New Expiration Date: 06/01/2023)
$43,959Addendum Adden #4-22 8/15/2022
Adden #5-23 - Hough Beck & Baird Inc - Provide additional geotechnical
engineering services for Philip Arnold Park Site Improvements and time
extension to 8/31/2023 (New Expiration Date: 08/31/2023)
$3,000Addendum Adden #5-23 1/9/2023
Adden #6-23 - Hough Beck & Baird Inc - Provide additional professional
services for the Philip Arnold Park Site Improvements project. (New
Expiration Date: 08/31/2023)
$21,586Addendum Adden #6-23 5/24/2023
CAG-20-010 PND Engineers - Design & Construction Admin Support for Coulon
Memorial Beach Park North Waterwalk Improvements
$285,783 $532,600 P 1/13/2020 10/1/2023
Contractor: (061121) PND ENGINEERS
1/13/2020
Adden #1-20 - PND Engineers - Corrosion Protection Study - North
Waterwalk piles (New Expiration Date: 03/31/2022)
$8,250Addendum Adden #1-20 4/27/2020
Adden #2-20 - PND Engineers - Design/construction support services for
pile corrosion protection & add'l regulatory coordination (New Expiration
Date: 03/31/2022)
$64,039Addendum Adden #2-20 12/16/2020
Adden #3-21 - PND Engineers - Provide services associated with
Restoration and Planting (RAP) Mitigation and Planting Design - Coulon
Park North Waterwalk Improvements (New Expiration Date: 03/31/2022)
$35,640AddendumAdden #3-21 9/16/2021
Adden #4-22 - PND Engineers Inc - Provide additional services
associated with design, permitting, bidding, and construction
administration (New Expiration Date: 10/01/2023)
$138,889Addendum Adden #4-22 4/29/2022
CAG-20-011 Bruce Dees & Associates - Professional Design & Construction Admin
Services for Kiwanis Park Site Improvements
$364,045 $408,267 P 1/13/2020 9/30/2023
Contractor: (011885) BRUCE DEES & ASSOCIATES LLC
1/13/2020
Adden #1-21 - Bruce Dees & Associates - Additional scope of work - Lot
Line Adjustment (New Expiration Date: 07/30/2021)
$3,000Addendum Adden #1-21 3/3/2021
Adden #2-21 - Bruce Dees & Associates - Contract time extension for
Kiwanis park Improvements professional Design Services (New
Expiration Date: 12/31/2021)
$0Addendum Adden 2 7/28/2021
Adden #2-21a - expiration date corrected to 12/31/2022 (New Expiration
Date: 12/31/2022)
$0Addendum2/7/2022
Adden #3-22 - Provide additional professional services for the Kiwanis
Park Site Improvements for project completion and time extension - all
work to be performed no later than May 31, 2023 (New Expiration Date:
05/31/2023)
$15,066Addendum Adden #3-22 12/22/2022
Adden #4-23 - Bruce Dees & Associates - provide Professional Services
for the Kiwanis Park Site Improvements for revision to storm water
drainage (New Expiration Date: 05/31/2023)
$13,206Addendum Adden #4-23 2/16/2023
Adden #5-23 - Bruce Dees & Associates - Provide Professional Services
for the Kiwanis Park Site Improvements for project CA and closeout -
Contract time extension (New Expiration Date: 09/30/2023)
$12,950Addendum Adden #5-23 5/24/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 32 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Pr-Ppnr
CAG-22-014 Redside Construction, LLC - Construction of Coulon North Water Walk Site
Improvements
$4,659,432 $4,831,838 P 9/14/2022 10/1/2023
Contractor: (044941) REDSIDE CONSTRUCTION LLC
9/14/2022
CO #1-23 - REDSIDE CONSTRUCTION LLC - Pile repair, painting scope
change, and misc cap crack/spall and bolt tightening repairs. (New
Expiration Date: 10/01/2023)
$9,462Change CO #1-23 1/12/2023
CO #2-23 - REDSIDE CONSTRUCTION LLC - additional contract
language and insurance required for King County Grant Agreement (New
Expiration Date: 10/01/2023)
$10,090Change CO #2-23 2/10/2023
CO #3-23 - REDSIDE CONSTRUCTION LLC - Additional structural steel
detailing and fabrication for the Coulon North Water Walk (New Expiration
Date: 10/01/2023)
$71,803Change CO #3-23 3/22/2023
CO #4-23 - REDSIDE CONSTRUCTION LLC - Additional painting of the
Pilot House roof for the Coulon North Water Walk (New Expiration Date:
10/01/2023)
$27,346ChangeCO #4-23 4/4/2023
CO #5-23 - REDSIDE CONSTRUCTION LLC - Additional galvanizing
cost for structural steel. (New Expiration Date: 10/01/2023)
$32,916Change CO #5-23 5/18/2023
CO #6-23 - REDSIDE CONSTRUCTION LLC - Coulon North Water Walk
- New light boxes, core driling, angle ledger/pour, patching, survey,
custom clips, replace dock arm (New Expiration Date: 10/01/2023)
$20,790Change CO #6-23 6/14/2023
CAG-22-341 Otto Rosenau & Associates - Provide material testing and special
inspection for the Coulon North Water Walk Project.
$19,980 $19,980 P 10/17/2022 9/1/2023
Contractor: (058570) OTTO ROSENAU & ASSOCIATES INC
Women Owned
10/17/2022
CAG-22-399 COMBINED CUTTING CONTRACTORS - 2023 On-Call Tree Maintenance
Services
$35,000 $40,200 P 12/15/2022 12/31/2023
Contractor: (016969) COMBINED CUTTING CONTRACTORS
12/15/2022
Adden #1-23 - COMBINED CUTTING CONTRACTORS - Remove 1 large
Cottonwood blown over River (no increase to contract dollar amount -
$13,762.50 to be disbursed from contract balance) (New Expiration Date:
12/31/2023)
$0Addendum Adden #1-23 1/11/2023
CO #1-23 - Combined Cutting Contractors - On-Call Tree Services
Agreement to add funds to contract. Urgent work at Liberty Park on eight
(8) trees. (New Expiration Date: 12/31/2023)
$5,200Change CO #1-23 4/20/2023
Adden #2-23 - COMBINED CUTTING CONTRACTORS - Addendum to
Adden #2-23 - COMBINED CUTTING CONTRACTORS - On-Call Tree
Services Agreement to pay for services rendered. $26,424.00 to be
disbursed from balance remaining on contract. (New Contract balance =
$13 (New Expiration Date: 12/31/2023)
$0Addendum Adden #2-23 5/3/2023
CAG-22-405 The Davey Tree Expert Company - 2023 On-Call Tree Maintenance
Services
$35,000 $35,000 P 12/21/2022 12/31/2023
Contractor: (020110) THE DAVEY TREE EXPERT COMPANY
12/21/2022
Adden #1-23 - The Davey Tree Expert Company - Addendum to On-Call
Tree Services Agreement for invoice payment ($20,771.47 to be
disbursed from balance remaining on contract. New Contract Balance =
$14,228.53) (New Expiration Date: 12/31/2023)
$0Addendum Adden #1-23 6/5/2023
CAG-22-406 Trelstad Tree (Trelstad Enterprises, LLC) - 2023 On-Call Tree Maintenance
Services
$35,000 $35,000 P 12/21/2022 12/31/2023
Contractor: (082475) TRELSTAD TREE
12/21/2022
Adden #1-23 - Trelstad Tree (Trelstad Enterprises, LLC) - Addendum to
On-Call Tree Services Agreement for payment for services rendered
($5,642.63 to be disbursed from balance remaining on contract - new
contract balance = $29,357.37) (New Expiration Date: 12/31/2023)
$0Addendum Adden #1-23 1/1/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 33 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Pr-Ppnr
CAG-23-053 Davey Resource Group, Inc. - Consultant Inspecting Arborist Services,
Urban Forestry & Natural Resources
$81,600 $81,600 P 2/27/2023 8/31/2023
Contractor: (020112) DAVEY RESOURCE GROUP INC
2/27/2023
CAG-23-077 RON'S STUMP REMOVAL & TREE SVC - Late Winter 2023 Tree Services
Agreement
$31,544 $31,544 P 3/7/2023 9/1/2023
Contractor: (069196) RON'S STUMP REMOVAL & TREE SVC
3/7/2023
CO #1-23 - RON'S STUMP REMOVAL & TREE SVC - Extend contract
period (from 6/30/2023 to 9/01/2023) (New Expiration Date: 09/01/2023)
$0Change CO #1-23 6/5/2023
CAG-23-119 Ron's Stump Removal & Tree Service - Spring 2023 Tree Services
Agreement
$35,397 $35,397 P 4/5/2023 9/1/2023
Contractor: (069196) RON'S STUMP REMOVAL & TREE SVC
4/5/2023
CO #1-23 - Ron's Stump Removal & Tree Service - Extend contract
period (from 8/4/2023 to 9/01/2023).
$0Change6/5/2023
CAG-23-120 Al Riedmann, Riedmann Enterprises, LLC dba Seattle Grow - 2023
Landscape & Tree Watering Services Agreement
$100,000 $100,000 P 4/5/2023 12/31/2023
Contractor: (001508) AL RIEDMANN
4/5/2023
CAG-23-204 Northwest Playground Equipment, Inc. - Replace slide at Kennydale Beach
Playground
$4,733 $4,733 P 5/18/2023 9/30/2023
Contractor: (056742) NW PLAYGROUND EQUIPMENT INC
5/18/2023
CAG-23-207 Trelstad Tree - 2023 Maple Valley Highway Roadside Tree Maintenance
Agreement
$49,545 $49,545 P 5/30/2023 8/25/2023
Contractor: (082475) TRELSTAD TREE
5/30/2023
CAG-23-236 NOW Environmental Services, Inc. - Asbestos and Lead Survey at 2718
Duvall Ave NE, Renton, WA (May Creek Park).
$1,500 $1,500 P 6/15/2023 7/31/2023
Contractor: (056000) NOW ENVIRONMENTAL SERVICES INC
Women Owned
6/15/2023
CAG-23-240 RAVE Foundation - Agreement for Futsal Court at Tiffany Park. $0 $0 M 6/15/2023 12/31/2023
Contractor: UNKNOWN VENDOR
6/15/2023
44
$6,747,612
1
$0
45
$6,747,612
Total
TotalMiscellaneousPayablesPr-Ppnr Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 34 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Pr-Rec
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 35 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Pr-Rec
CAG-21-174 King County Dept of Community & Human Services - oversight
coordination & implementation of Renton Senior Activity Center Hub
($115,384 rev)
$115,384 $168,969 R 7/13/2021 12/31/2023
Contractor: UNKNOWN VENDOR
7/13/2021
Adden #1-23 - King County Comm & HS Adult Services Division - Renton
Senior Center Hub VSHSL, time extension, distribution 2022 reduction,
2023 addition. (New Expiration Date: 12/31/2023)
$53,585Addendum Adden #1-23 4/5/2023
CAG-22-139 King County Natural Resources & Parks - Grant funds for scholarships &
equipment purchase for Adaptive Recreation Program ($10,000 rev)
$10,000 $10,000 R 4/25/2022 12/31/2023
Contractor: UNKNOWN VENDOR
4/25/2022
Adden #1-23 - King County Natural Resources & Parks - Get Active Stay
Active Grant term extension to 12/31/2023 (New Expiration Date:
12/31/2023)
$0Addendum Adden #1-23 3/24/2023
CAG-22-235 GooseChase Adventures - Provide access to the GooseChase Adventures
Application (invoices to be paid through US Bank card).
$5,000 $5,000 P 7/8/2022 7/12/2023
Contractor: (083670) US BANK ONE CARD
7/8/2022
CAG-22-253 Environmental Science Center - Environmental Programming and Use of
Space at Liberty Park Building
$0 $0 M 8/2/2022 12/30/2023
Contractor: UNKNOWN VENDOR
8/2/2022
CAG-22-282 Afterglow Fitness LLC - Provide fitness classes and orientations on how to
utilize fitness equipment
$30,000 $30,000 P 9/1/2022 9/1/2023
Contractor: (001128) AFTERGLOW FITNESS LLC
Women Owned
9/1/2022
CAG-22-291 Linda Mounts - Fit Lot Exercise Instructor Agreement $11k $11,000 $11,000 P 9/1/2022 9/1/2023
Contractor: (073899) LINDA M MOUNTS
Minority Owned, Disadvantaged Business, Women Owned
9/1/2022
CAG-22-292 Linda Mounts - Fit Lot Exercise Instructor Agreement $20k $20,000 $20,000 P 9/1/2022 9/1/2023
Contractor: (073899) LINDA M MOUNTS
Minority Owned, Disadvantaged Business, Women Owned
9/1/2022
CAG-22-331 Pacific Northwest Basketball Officials Assoc - Providing Officials for Men’s
Rec Basketball Leagues
$20,000 $20,000 P 10/6/2022 8/31/2023
Contractor: (059510) PACIFIC NW BASKETBALL OFFICALS
Minority Owned
10/6/2022
Adden #1-23 - PACIFIC NW BASKETBALL OFFICALS - New agreement
for PNBOA referee fees (New Expiration Date: 08/31/2023)
$0Addendum Adden #1-23 4/11/2023
CAG-22-346 Skyhawks Sports Academy - Sports programs provided through Renton
Recreation ($20,000 rev)
$20,000 $20,000 R 10/18/2022 10/31/2023
Contractor: UNKNOWN VENDOR
10/18/2022
CAG-22-347 Drama Kids of South & East King County - Materialized LLC - Instructor for
Creative Arts Program
$10,000 $10,000 P 10/18/2022 12/31/2023
Contractor: (022105) DRAMA KIDS OF S & E KING CNTY
Women Owned
10/18/2022
CAG-23-002 EASTSIDE DREAM ELITE LLC - Provide cheerleading recreation classes $20,000 $20,000 P 12/29/2022 12/31/2023
Contractor: (022980) EASTSIDE DREAM ELITE LLC
Women Owned
12/29/2022
CAG-23-011 THE OFTEN COMPANY - Adaptive Recreation Enrichment Classes $10,000 $10,000 P 1/10/2023 12/31/2023
Contractor: (080792) THE OFTEN COMPANY
Women Owned
1/10/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 36 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Pr-Rec
CAG-23-139 SNAPOLOGY OF EASTSIDE - Provide STEAM Specialty Camps $30,000 $30,000 P 4/11/2023 12/31/2023
Contractor: (075995) SNAPOLOGY OF EASTSIDE
4/11/2023
CAG-23-144 Law offices of Daniel Kellogg - Senior Center Free Legal Advice $0 $0 M 1/24/2023 12/31/2023
Contractor: UNKNOWN VENDOR
1/24/2023
CAG-23-150 CHELSEA HUENNEKENS - Provide Enrichment Classes $12,000 $12,000 P 4/25/2023 12/31/2023
Contractor: (015059) CHELSEA HUENNEKENS
4/25/2023
CAG-23-171 ROACH GYMNASTICS INC - May-December 2023 gymnastics instructor
for Rec programming.
$36,000 $36,000 P 5/4/2023 12/31/2023
Contractor: (068800) ROACH GYMNASTICS INC
5/4/2023
CAG-23-172 NATIONAL EVENT PROS - National Event Pros is providing rides and ride
staff for the Kids Zone at Renton River Days
$60,000 $60,000 P 5/15/2023 9/30/2023
Contractor: (016395) NATIONAL EVENT PROS
5/15/2023
CAG-23-175 SEA METRO SOFTBALL UMPIRE ASSN - Contract with Seattle Metro
Softball Umpire Association for game officials for softball season
$25,000 $25,000 P 5/9/2023 11/30/2023
Contractor: (072700) SEA METRO SOFTBALL UMPIRE ASSN
5/9/2023
CAG-23-185 JORDAN BYE - Instructor of enrichment classes $10,000 $10,000 P 5/15/2023 12/31/2023
Contractor: (039828) JORDAN BYE
5/15/2023
CAG-23-200 BELL LAP PRODCUTIONS LLC - Race Timing for Dragon Dash 5K and K9
Candy Cane Race
$6,000 $6,000 P 5/19/2023 12/3/2023
Contractor: (008566) BELL LAP PRODCUTIONS LLC
Women Owned
5/19/2023
CAG-23-220 Animal Encounters - Petting zoo for Renton River Days 2023 $9,250 $9,250 P 6/1/2023 7/23/2023
Contractor: (005122) ANIMAL ENCOUNTERS
6/1/2023
CAG-23-221 SOUNDS UNLIMITED - DJ Services for Adaptive Programs $450 $450 P 5/16/2023 12/31/2023
Contractor: (065720) RANDELL KRUSE
5/16/2023
CAG-23-222 MARTHA N SOTO - Forza Dragon Martial Arts - Instructor for Tae Kwon
Do classes at Highlands Community Center
$35,000 $35,000 P 6/16/2023 12/31/2023
Contractor: (047255) MARTHA N SOTO
Minority Owned, Women Owned
6/16/2023
CAG-23-243 FUNFLICKS - Provide outdoor movie equipment rentals for summer
outdoor movies.
$18,000 $18,000 P 6/24/2023 8/31/2023
Contractor: UNKNOWN VENDOR
6/24/2023
CAG-23-247 RENTON ROWING CENTER - Instruction for Row, Paddle, Play program $8,000 $8,000 P 6/27/2023 8/11/2023
Contractor: (067180) RENTON ROWING CENTER
6/27/2023
CAG-23-264 WATCHDOG MEDIA - Agreement for musical entertainment for Renton
River Days 2023.
$2,000 $2,000 P 7/10/2023 7/23/2023
Contractor: (067300) WATCHDOG MEDIA
7/10/2023
CAG-23-265 JAPAN CREATIVE ARTS - Taiko drumming entertainment for Renton River
Days 2023.
$650 $650 P 7/10/2023 7/23/2023
Contractor: (039021) JAPAN CREATIVE ARTS
Minority Owned, Women Owned
7/10/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 37 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
23
$378,350
5
$198,969
2
$0
30
$577,319
Total
TotalMiscellaneousReceivablesPayablesPr-Rec Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 38 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Public Works
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 39 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Public Works
CAG-09-188 AssetWork, Inc - Automated Fuel Dispensing Vendor $62,138 $106,866 P 11/16/2009 12/31/2023
Contractor: (006350) ASSETWORKS LLC
11/16/2009
Adden #1-21 - AssetWorks - annual maintenance renewal for Assetwork
Fleet Management System (1/1/2022-12/31/2022) (New Expiration Date:
12/31/2022)
$21,504Addendum Adden #1-21 12/6/2021
Adden #2-22 - Assetworks - Annual maintenance renewal for Assetwork
Fleet Management System - 01/01/2023 - 12/31/2023 (New Expiration
Date: 12/31/2023)
$23,224Addendum Adden #2-22 10/17/2022
CAG-13-141 FAA - Taxiway Bravo Rehabilitation Project FAA Grant 24. Rev:
$7,150,000
$7,150,000 $7,400,000 R 6/27/2013 12/31/2023
Contractor: (1020) FEDERAL AVIATION ADMIN
6/27/2013
FAA - Grant 024 - Adden #1-14 - Amendment to increase the Grant
amount. Rev $250,000.00 (Prevous Expiration Date: 12/31/2023 and New
Expiration Date: 12/31/2023)
$250,000Addendum Adden #1-14 9/8/2014
CAG-16-103 RH2 Engineering, Inc. - Replace Highlands 435 Pressure Zone Reservoirs
and Mains - Final Design and Bidding
$697,088 $1,472,294 P 6/8/2016 12/31/2023
Contractor: (068180) RH2 ENGINEERING INC
6/8/2016
Adden #1-17 - RH2 Engineering, Inc. - additional work & time extension.
(Prevous Expiration Date: 03/31/2018 and New Expiration Date:
06/30/2018)
$227,276Addendum Adden #1-17 8/15/2017
Adden #2-18 - RH2 Engineering, Inc. - time extension.only (New
Expiration Date: 06/30/2019)
$0Addendum Adden #2-18 6/28/2018
Adden #3-19 - RH2 Engineering - Time Extension only (New Expiration
Date: 12/31/2019)
$0Addendum Adden #3-19 6/28/2019
Adden #4-19 - RH2 Engineering, Inc. - Additional work and Time
extension (New Expiration Date: 12/31/2020)
$199,600Addendum Adden #4-19 11/26/2019
Adden #5-20 - RH2 engineering, inc. - Time Extension for Final Design
and Bidding (WTR2703888) (New Expiration Date: 12/31/2021)
$0Addendum adden #5-20 12/10/2020
Adden #6-21 - RH@ Engineering, inc. - Replacement of Highlands 435
pressure zone reservoirs and mains - Final Design and bidding - time
extension (New Expiration Date: 12/31/2022)
$0Addendum Adden #6-21 12/28/2021
Adden #7-22 - RH2 Engineering, Inc. - Replacement of Highlands 435
Pressure Zone Reservations Time Extension only (New Expiration Date:
12/31/2023)
$0Addendum Adden #7-22 12/21/2022
Adden #8-23 - RH2 ENGINEERING INC - Replacement of Highlands
435 Pressure Zone Reservoirs and Mains - Final Design and Bidding
(New Expiration Date: 12/31/2023)
$348,330Addendum Adden #8-23 6/14/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 40 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Public Works
CAG-16-108 Stantec Consulting Services - Thunder Hills Sanitary Sewer Interceptor
Replacement Project - Design and Construction Services
$313,700 $610,765 P 6/23/2016 10/31/2023
Contractor: (077215) STANTEC CONSULTING SVCS INC
6/23/2016
Adden #1-17 - Stantec Consulting Services, Inc. - additional mitigation
plan development and incorporation. (Prevous Expiration Date:
12/31/2018 and New Expiration Date: 12/31/2018)
$82,492Addendum Adden #1-17 5/15/2017
Adden #2-17 - Stantec Consulting Services, Inc. - additional work.
(Prevous Expiration Date: 12/31/2018 and New Expiration Date:
12/31/2018)
$21,700Addendum Adden #2-17 8/23/2017
Adden #3-19 - Stantec Consulting - Extend Expiration Date only (New
Expiration Date: 09/30/2020)
$0Addendum Adden #3-19 1/30/2019
Adden #4-19 - Stantec Consulting Services, Inc. - Additional Services for
permit completion (New Expiration Date: 03/31/2021)
$170,833Addendum Adden #4-19 4/25/2019
Adden #5-21 - Stantec Consulting Services, Inc - Time Extension for
Thunder Hills Sewer Project (WWP2703921) (New Expiration Date:
03/31/2022)
$0Addendum Adden #5-21 3/18/2021
Adden #6-22 - Stantec Consulting Services, Inc - Budget increase and
time extension for Thunder Hills Sewer - Design & Construction Services
(WWP2703921) (New Expiration Date: 10/31/2023)
$22,040AddendumAdden #6-22 3/29/2022
CAG-16-140 DGK, Inc. (dba Widener and Associates) - Environmental professional
services for Duvall Ave NE project
$16,714 $65,912 P 9/19/2016 12/31/2023
Contractor: (091850) WIDENER & ASSOCIATES
9/19/2016
Adden #1-17 - DGK, Inc dba Widener & Associates - Duvall Ave NE
Project - time extension only (Prevous Expiration Date: 12/31/2017 and
New Expiration Date: 12/31/2018)
$0Addendum Adden #1-17 12/4/2017
Adden #2-18 - DGK, Inc. -Time Extension only - Duvall Av NE Project$0Addendum Adden #2-18 12/9/2018
Adden #3-19 - DGK, Inc. dba Widener & Associates - Time extension
only - Duvall Av NE Project (New Expiration Date: 12/31/2021)
$0Addendum Adden #3-19 12/17/2019
Adden #4-20 - DGK, Inc. (Widener & Associates) - Additional design
environmental services/permitting support and construction
environmental services/permitting support
$49,199Addendum Adden #4-20 8/26/2020
Adden #4-20 - DGK Inc - UPDATING THE EXPIRATION DATE THAT
WASN'T UPDATED IN 2020 - #4 had an expiration date of 12/31/2023
(New Expiration Date: 12/31/2023)
$0Addendum Adden #4-20 10/1/2020
CAG-16-174 State of Washington Dept of Enterprise Services (DES) - Engergy Utility
Conservation Project Management & Monitoring Services
$58,300 $120,800 P 11/1/2016 12/31/2023
Contractor: (020831) DEPT OF ENTERPRISE SERVICES
11/1/2016
Adden #3-20 - WA State Department of Enterprise Services (DES) -
Additional project management services - Renton City Hall Ph 2 (New
Expiration Date: 12/31/2023)
$62,500Addendum Adden #3-20 12/10/2020
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 41 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Public Works
CAG-17-050 RH2 Engineering, Inc. - Lift Station and Force Main Rehabilitation Group 1
Facilities Predesign
$176,379 $1,218,869 P 3/20/2017 12/31/2023
Contractor: (068180) RH2 ENGINEERING INC
3/20/2017
Adden #1-17 - RH2 Engineering, Inc. - waste water and stormwater pump
stations telemetry panel replacement. (Prevous Expiration Date:
06/30/2018 and New Expiration Date: 06/30/2018)
$27,071Addendum Adden #1-17 8/24/2017
Adden #2-18 - RH2 Engineering - Final Design & Services during
construction
$332,000Addendum Adden #2-18 7/11/2018
Adden #3-19 - RH2 Engineering - Services during construction (New
Expiration Date: 06/30/2020)
$72,593AddendumAdden #3-19 4/5/2019
Adden #3-19 - RH2 Engineering, Inc - Services during construction$72,593Addendum Adden #3-19 4/11/2019
CORRECTION - DUPLICATE NEEDED DELETED. Adden #3-10 - RH@
Engineering, Inc. Services during construction entered 4/30/2019
$-72,593Addendum Adden #3-19 4/11/2019
Adden #4-20 - RH2 Engineering - Time extension (WWP273954) (New
Expiration Date: 06/30/2021)
$0Addendum Adden #4-20 6/1/2020
Adden #5-21 - RH2 engineering, Inc. - Time Extension (WWP273954)
(New Expiration Date: 12/31/2021)
$0Addendum Adden #5-21 7/22/2021
Adden #6-21 - RH2 engineering, inc. - Preliminary design of Group 2 and
final design of Groups 1 and 2 (WWP273954) (New Expiration Date:
12/31/2021)
$0Addendum Adden #6-21 10/14/2021
Adden #6-21 -Amount was left off the last entry - RH2 engineering, inc. -
Preliminary design of Group 2 and final design of Groups 1 and 2
(WWP273954)
$520,826Addendum10/22/2021
REVISED Adden #6-21 - the amount in the last entry was forgotten - RH2
engineering, inc. - Preliminary design of Group 2 and final design of
Groups 1 and 2 (WWP273954)
$520,826Addendum Adden 6 10/14/2021
REVISED FOR DUPLICATED 3342 & 3343 WERE DOUBLED Adden
#6-21 - the amount in the last entry was forgotten - RH2 engineering, inc.
- Preliminary design of Group 2 and final design of Groups 1 and 2
(WWP273954)
$-520,826Addendum12/13/2021
REVISED Adden #6-21 - Time extension was missed. it should be
12/31/2022 (New Expiration Date: 12/31/2022)
$0Addendum Adden 6 12/13/2021
Adden #7-22 - RH2 engineering, inc. - Lift Station and Force Main Rehab
Phase 2 - Services During Const.
$90,000Addendum Adden #7-22 4/14/2022
Adden #8-22 - RH2 Engineering, Inc. - Lift Station and Force Main Rehab
Phase 2 - time extension only (New Expiration Date: 12/31/2023)
$0Addendum Adden #8-22 12/21/2022
CAG-18-085 Watershed Science & Engineering - Madsen Creek Improvement Project
Phase 1 for Surveying, Hyraulic Analysis, Preliminary Design
$466,098 $639,776 P 5/1/2018 12/31/2023
Contractor: (089970) WATERSHED SCIENCE ENGINEERING
5/1/2018
Adden #1-20 - Watershed Science & Engineering, Inc. - Madsen Creek
Improvements Final Design SWP-27-3976 (New Expiration Date:
12/31/2021)
$99,903Addendum Adden 1 3/26/2020
Adden #2-20 - Watershed Science & Engineering, Inc. - Madsen Creek
Improvements Design Changes (SWP2703976) (New Expiration Date:
12/31/2021)
$73,775Addendum Adden #2-20 12/21/2020
Adden #3-21 - Watershed Science & Engineering, Inc. - Madsen Creek
Improvement Project - time Extension (SWP27-39-76)
$0AddendumAdden #3-21 12/10/2021
CAG-18-114 Universal Sealed Services, Inc. - Wells & Williams Ave Conversion Project
- ROW Acquisition Services
$40,627 $85,829 P 9/20/2018 12/31/2023
Contractor: (084350) UNIVERSAL FIELD SERVICES INC
9/20/2018
Adden #1-19 - Universal Field Services, Inc. - Additional Right-of-Way
Services for Wells/Williams
$15,349Addendum Adden #1-19 5/16/2019
Adden #2-19 - Universal Field Services, Inc. - Right-of-Way Services for
Houser Way Complete Streets
$29,853Addendum Adden #2-19 5/7/2019
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 42 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Public Works
CAG-18-167 Perkins Coie LLP - Legal Professional Service for Family First Community
Center
$20,000 $30,000 P 8/15/2018 12/31/2023
Contractor: (061142) PERKINS COIE LLP
8/15/2018
Adden #1-22 - Perkins Coie, LLC - Extends time and adds fee for
as-needed legal services
$10,000Addendum1/24/2022
CAG-19-019 Baylis Architects - Architect for Family First Community Center $1,239,097 $1,307,107 P 1/23/2019 9/30/2023
Contractor: (008187) BAYLIS ARCHITECTS
1/23/2019
Adden #1-19 - Baylis Architects - additional scope of work per ASR 1 & 2
and time extension (New Expiration Date: 04/30/2021)
$24,614Addendum Adden #1-19 5/10/2019
Adden #2-21 - Baylis Architects - time extension only (New Expiration
Date: 06/30/2023)
$0Addendum Adden #2-21 6/15/2021
Adden #3-21 - Baylis architects - amendment 4 to PSA (New Expiration
Date: 09/30/2023)
$43,396Addendum Adden #3-21 11/10/2021
CAG-19-203 King County Flood Control Zone District - Cedar River 205 Levee
Recertification Grant
$5,000 $5,000 R 7/17/2019 12/31/2023
Contractor: (1067) KING COUNTY
7/17/2019
CAG-19-306 WSDOT - Renton Elementary & Middle School Crossings Project Grant
$66,300.00
$66,300 $66,300 R 11/27/2019 12/31/2023
Contractor: (1257) WA ST DOT - NW REGION
11/27/2019
Adden #1-20 - WSDOT - Supplemt #1 Agreement to obligate construction
funding for the Renton School Xings project rev: $662,605.00
$0Addendum Adden #1-20 9/14/2020
CAG-19-333 Gray & Osborne, Inc. - Design Engineering Services - 2020 Street Patch &
Overlay
$23,565 $114,552 P 12/3/2019 12/31/2023
Contractor: (031245) GRAY & OSBORNE INC
12/3/2019
Adden #1-20 - Gray & Osborne, Inc. - Additional design services for 2020
Street Patch & Overlay Project
$54,790Addendum Adden #1-20 3/4/2020
Adden #2-22 - Gray & Osborne, Inc. - Engineering Services during
construction & materials testing for the 2022 overlay project (New
Expiration Date: 12/31/2023)
$36,196Addendum Adden #2-22 10/24/2022
CAG-19-334 Gray & Osborne, Inc. - Design Engineering Services - 2019 - 2020 Curb
Ramps for Overlay
$86,016 $197,365 P 12/3/2019 12/31/2023
Contractor: (031245) GRAY & OSBORNE INC
12/3/2019
Adden #1-20 - Gray & Osborne - additional design services for
2019-2020 curb ramps for overlay project (New Expiration Date:
12/31/2022)
$75,267Addendum Adden #1-20 3/5/2020
Adden #2-22 - Gray & Osborne, inc.- Assistance during bidding,
engineering support during project’s construction phase, and materials
testing (New Expiration Date: 12/31/2023)
$36,082Addendum Adden #2-22 5/3/2022
CAG-19-366 All Traffic Data Services - Provide More traffic Counts on an on-call basis $25,000 $50,000 P 12/13/2019 12/31/2023
Contractor: (001985) ALL TRAFFIC DATA SERVICES INC
Women Owned
12/13/2019
Adden #1-21 - All traffic Data -Extension of our contract for Traffic Count
Data (New Expiration Date: 12/31/2022)
$0Addendum Adden #1-21 12/9/2021
Adden #2-22 - All Traffic Data - Extension of our contract for fee amount
and traffic gathering data (New Expiration Date: 12/31/2023)
$25,000Addendum Adden #2-22 11/28/2022
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 43 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Public Works
CAG-20-101 McKinstry-ESCO - Design & construction to retrofit existing building
systems for energy efficiency
$130,115 $2,695,534 P 6/22/2020 12/21/2023
Contractor: (048353) MCKINSTRY ESSENTION LLC
6/22/2020
Adden #1-20 - McKinstry-ESCO - Project Design, construction &
verification - provide new fire pumps, boilers, computer room cooling
(New Expiration Date: 12/31/2023)
$2,407,491Addendum Adden #1-20 12/11/2020
CO #1-21 - McKinstry - Subcontract Labor Escalation (New Expiration
Date: 12/21/2023)
$28,162Change CO #1-21 4/20/2021
CO #3-21 - McKinstry - Cost Delta for Fuel Shortage Tank Size Increase
(New Expiration Date: 12/21/2023)
$7,541ChangeCO #3-21 4/20/2021
CO #4-21 - McKinstry - IT Room Wall Structure Modifications (New
Expiration Date: 12/21/2023)
$2,697Change CO #4-21 4/20/2021
CO #2-21 - McKinstry - Boiler Room Drain Waste Line (New Expiration
Date: 12/21/2023)
$13,876ChangeCO #2-21 4/20/2021
CO #5-21 - McKinstry - revisions to ESCO phase 2 Scope of work$93,225Change CO #5-21 11/29/2021
CO #6-22 - McKinistry Essention - Contingency Use Acknowledgement$0Change CO #6-22 1/5/2022
CO #7-22 - McKinistry Essention - Provide New Canopy Light Fixtures$12,427Change CO #7-22 1/5/2022
CAG-20-133 RH2 Engineering, Inc. - Highlands Reservoir Phase 1 - Offsite
Improvements
$350,827 $350,827 P 3/19/2021 12/31/2023
Contractor: (068180) RH2 ENGINEERING INC
3/19/2021
Adden #1-22 - RH2 Engineering, inc. - Services during Construction of
Highlands Reservoir Phase 1-Off-Site - time extension only (New
Expiration Date: 12/31/2023)
$0Addendum Adden #1-22 12/23/2022
CAG-20-163 Carollo Engineers, Inc. - Kennydale Lakeline Sewer System Improvements
Project (WWP2704134)
$1,188,560 $1,188,560 P 9/15/2020 12/31/2023
Contractor: (013783) CAROLLO ENGINEERS PC
9/15/2020
Adden #1-21 - Carollo Engineers, Inc. - Amendment 1 - Kennydale
lakeline project (New Expiration Date: 12/31/2022)
$0Addendum Adden #1-21 12/22/2021
Adden #2-22 - Carollo Engineer's Inc. - Amendment 2 - Kennydale
Lakeline Project (New Expiration Date: 12/31/2023)
$0Addendum Adden #2-22 12/12/2023
REVISED Adden #2-22 - Carollo Engineer's Inc. - to include the
expiration date of 12/31/2023 - Kennydale Lakeline Project (New
Expiration Date: 12/31/2023)
$0Addendum12/20/2022
CAG-20-378 WSP USA Inc. - Stormwater Facility Feasibility Study for future Water
Quality Improvement (SWP274129)
$228,721 $258,225 P 9/30/2020 12/31/2023
Contractor: (060557) WSP USA INC
9/30/2020
Adden #1-22 - WSP USA, Inc - Add work and increase compensation for
Stormwater Facility Retrofit Study Project (New Expiration Date:
06/30/2022)
$29,504Addendum Adden #1-22 2/24/2022
Adden #2-22 - WSP USA, Inc. - Time Extension to December 31, 2023
(New Expiration Date: 12/31/2023)
$0AddendumAdden #2-22 6/24/2022
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 44 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Public Works
CAG-21-001 SCI Infrastructures, LLC - Downtown Utilities Improvement Project $10,555,987 $13,688,101 P 2/5/2021 12/31/2023
Contractor: (071455) SCI INFRASTRUCTURE LLC
2/5/2021
CO #1-21 - SCI Infrastructures, LLC. - Additional quantities - Downtown
Utilities Improvement Project (New Expiration Date: 03/31/2023)
$2,852,414Change CO #1-21 12/14/2021
CO #2-22 - SCI Infrastructure, LLC - Change order for additional work
(New Expiration Date: 03/31/2023)
$67,443Change CO #2-22 3/22/2022
CO #3-22 - SCI Infrastructure, LLC - Change order for additional work$40,087Change CO #3-22 5/5/2022
CO #4-22 - SCI Infrastructure, LLC - Change order for additional work -
Extra excavation and materials
$18,455Change CO #4-22 4/26/2022
CO #5-22 - SCI Infrastructure, LLC - Change order for additional work$60,042Change CO #5-22 6/7/2022
CO #6-22 - SCI Infrastructure, LLC - Change order for additional work$31,737Change CO #6-22 5/26/2022
CO #7-22 - SCI Infrastructure, LLC - Change order for additional work$34,980Change CO #7-22 6/24/2022
CO #8-22 - SCI Infrastructure, LLC - Change order for additional work
(New Expiration Date: 03/31/2023)
$1,801Change CO #8-22 7/22/2022
CO #9-22 - SCI Ingrastruture, llc - Change order for additional work (New
Expiration Date: 03/31/2023)
$4,916Change CO #9-22 7/22/2022
CO #10-22 - SCI Infrastructure, LLC - Change Order for Additional Work
(New Expiration Date: 03/31/2023)
$20,238Change CO #10-22 8/9/2022
Expiration should have been 12/31/2023 - SCI Infrastructure, LLC (New
Expiration Date: 12/31/2023)
$0Change12/1/2022
CAG-21-011 Murraysmith, Inc. - Services During Construction for the Downtown Utility
Improvement Project (WWP2703949)
$1,597,678 $1,775,364 P 1/13/2021 8/31/2023
Contractor: (052444) CONSOR NORTH AMERICA INC
1/13/2021
Adden #1-21 - Murraysmith, Inc. - Downtown Utility Improvement Project
Services During Construction (WWP2703949) (New Expiration Date:
01/21/2023)
$177,686Addendum Adden #1-21 9/27/2021
Adden #2-23 - Consor North America, Inc. - Downtown Utility
Improvement Project Services during construction (New Expiration Date:
08/31/2023)
$0Addendum Adden #2-23 1/12/2023
CAG-21-017 Century West Engineering Corporation - A&E On-Call Professional
Services - Pavement
$30,000 $215,931 P 1/20/2021 12/31/2023
Contractor: (014533) CENTURY WEST ENGINEERING CORP
1/20/2021
Adden #1-21 - Century West Engineering Corporation - Increase
Compensation
$26,527Addendum Adden #1-21 12/31/2021
added incorrect expiration date before - Adden #1a-21 - Century West
Engineering Corporation - Increase Compensation
$0Addendum2/16/2021
Adden #2-21 - Century west engineering Corporation - Increase
Compensation
$46,879Addendum Adden #2-21 4/12/2021
Adden #3-21 - Century West Engineering Corporation- Increase
compensation
$66,607Addendum Adden #3-21 5/27/2021
Adden #4-21 - Century West Engineering Corporation - Increase
Compensation (New Expiration Date: 12/31/2021)
$7,920Addendum Adden #4-21 12/28/2021
Adden #1-22 - Midwestern Software Solutions - Annual maintenance
renewal for TDMS (4/1/2022-3/31/2023) (New Expiration Date:
03/31/2023)
$7,270Addendum Adden #1-22 1/20/2022
Adden #5-22 - Century West Engineering Corporation - Increase
Scope/Compensation (New Expiration Date: 12/31/2021)
$37,999Addendum Adden #5-22 1/12/2022
EDIT: This is the wrong Adden #1-22 - Midwestern Software Solutions -
Annual maintenance renewal for TDMS (4/1/2022-3/31/2023)
$-7,270Addendum1/24/2022
Adden #6-22 - Century West Engineering Corporation - Increase
Scope/Compensation - expiration date (New Expiration Date: 12/31/2023)
$0Addendum Adden #6-22 9/26/2023
AMENDED EXPIRATION DATE - Adden #6-22 - Century West
Engineering Corporation - Increase Scope/Compensation - expiration
date (New Expiration Date: 12/31/2023)
$0Addendum10/5/2022
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 45 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Public Works
CAG-21-130 ARC Architects - Design Services - Henry Moses Aquatics Center $55,000 $154,550 P 5/13/2021 12/31/2023
Contractor: (003922) ARC ARCHITECTS INC
5/13/2021
Adden #1-22 - ARC Architects - Additional design services for HMAC
renovation (New Expiration Date: 12/31/2023)
$99,550Addendum Adden #1-22 9/5/2022
CAG-21-140 Greene Gasaway Architects - Architectural Design Services $20,000 $347,449 P 5/24/2021 12/31/2023
Contractor: (026569) GREENE GASAWAY ARCHITECTS
5/24/2021
Adden #1-21 - Greene Gasaway architects - additional scope and time
extention (New Expiration Date: 12/31/2021)
$12,510Addendum Adden #1-21 12/23/2021
Adden #1A-21 - SCHEDULED COMPLETION PUT IN INCORRECTLY
Greene Gasaway architects - additional scope and time extention (New
Expiration Date: 12/31/2022)
$0Addendum12/31/2021
Adden #2-22 - Greene Gasaway Architects - Design services to construct
new behavioral health unit (New Expiration Date: 12/31/2023)
$314,939Addendum Adden #2 9/5/2022
CAG-21-151 Perteet, Inc. - Evaluation of Pavement Management Plan Strategies $23,680 $71,840 P 6/10/2021 7/31/2023
Contractor: (061292) PERTEET INC
6/10/2021
Adden #1-22 - Perteet, Inc. - Develop the project over the 10 year period
determining specific treatments and funding levels (New Expiration Date:
07/31/2023)
$33,690Addendum Adden #1-22 7/27/2022
Adden #2-23 - Perteet, Inc - The Consultant will now be responsible for
the development of specific projects. (New Expiration Date: 07/31/2023)
$0Addendum Adden #2-23 1/12/2023
AMENDED Adden #2A-23 - Perteet, Inc - The Consultant will now be
responsible for the development of specific projects. This should have
had an amount of $14,470.00 to pay on it. since we put .01 in the 2nd
addendum we are now adding 14,469.99 in
$14,470Addendum Adden 2A 1/12/2023
CAG-21-190 Gscott Works - Signage Design for Family First Community Center $25,000 $25,000 P 7/30/2021 12/31/2023
Contractor: (028220) G SCOTT WORKS LLC
7/30/2021
Adden #1-22 - G Scott Works - Amendment 1 - time extension (New
Expiration Date: 12/31/2023)
$0AddendumAdden #1-22 8/24/2022
CAG-21-261 Gary Harper Construction, Inc. - Lift Station and Force Main Rehabilitation
Phase 2 (Group 1B)
$518,571 $518,571 P 3/28/2022 12/31/2023
Contractor: (028562) GARY HARPER CONSTRUCTION INC
3/28/2022
CAG-21-263 Renton Safer Access to Neighborhood Destinations Grant ($247,397.00
REV)
$247,397 $247,397 R 11/23/2021 9/30/2023
Contractor: UNKNOWN VENDOR
11/23/2021
Adden #1-22 - Washington Traffic Safety Commission - Signature
Request for 2nd Year of SANDS Grant (New Expiration Date:
09/30/2023)
$0Addendum Adden #1-22 9/21/2022
CAG-21-306 Pacifica Law Group - Legal Services - Rainier Av Phase 4 - conflict
properties
$30,000 $30,000 P 12/20/2021 12/31/2023
Contractor: (059960) PACIFICA LAW GROUP LLP
12/20/2021
CAG-22-035 Provide special inspections for Family First Community Center - Materials
Testing and Consulting
$20,000 $20,000 P 2/2/2022 12/31/2023
Contractor: (047590) MATERIALS TESTING & CONSULTING
2/2/2022
CAG-22-039 David Evans and Associates (DEA) Inc. - CMP Rehabilitation Design
Services
$92,900 $92,900 P 2/11/2022 12/21/2023
Contractor: (020180) DAVID EVANS & ASSOCIATES INC
2/11/2022
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 46 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Public Works
CAG-22-047 Makenzie Engineering - 7th floor Tenant Improvements Design
Development
$187,572 $227,352 P 2/23/2022 12/31/2023
Contractor: (045998) MACKENZIE ENGINEERING INC
2/23/2022
Adden #1-22 - Mackenzie Engineering - Redesign work for the 7th floor
HR area (New Expiration Date: 07/31/2022)
$24,980Addendum Adden #1-22 10/26/2022
REVISED EXPIRATION DATE - Adden #1-22 - Mackenzie Engineering -
Redesign work for the 7th floor HR area (New Expiration Date:
12/31/2023)
$0Addendum Adden #1-23 12/20/2022
Adden #2-23 - Mackenzie Engineering - Redesign work for the 7th floor
HR area - FFE Design Assistance (New Expiration Date: 12/31/2023)
$14,800AddendumAdden #2-23 2/24/2023
CAG-22-071 Johnston architects - Professional Services Agreement for A&E Services $63,540 $83,330 P 3/16/2022 7/31/2023
Contractor: (039717) JOHNSTON ARCHITECTS LLC
Women Owned
3/16/2022
Adden #1-22 - Johnston Architects - Increase Compensation & Scopre
(New Expiration Date: 07/31/2022)
$11,860AddendumAdden #1-22 6/16/2022
Adden #2-22 - Johnston Architects - Increase compensation and scope
rebid (New Expiration Date: 07/31/2022)
$7,930Addendum Adden #2-22 10/31/2022
Adden #2a-22 - EXPIRATION DATE EXTENDED TO 7/31/2023 -
Johnston Architects - Increase compensation and scope rebid (New
Expiration Date: 07/31/2023)
$0AddendumAdden #2-22 12/20/2022
CAG-22-072 WSP USA, Inc. - Hardie Avenue SW – SW 7th Street Storm System
Improvement Project, Phase 3 - Easement Assessment & Technical
Supports
$34,825 $34,825 P 3/10/2022 12/31/2023
Contractor: (060557) WSP USA INC
3/10/2022
CAG-22-073 Pace engineers - As Build survey of fire Station 15 storm water system $3,500 $3,500 P 3/10/2022 12/31/2023
Contractor: UNKNOWN VENDOR
3/10/2022
CAG-22-159 Judha of Lion Landscaping and Services - Curb Ramp Replacement $82,612 $83,676 P 8/8/2022 12/31/2023
Contractor: (039884) JUDHA OF LION LANDSCAPING
8/8/2022
CO #1-22 - Judha of Lion Landscaping and Services - Curb Ramp
Replacement - Adding Sales Tax
$1,064Change CO #1-22 10/19/2022
Adden #1-22 - Port of Seattle - Clarification on carryforward funds not
allocated in 2022 to be spent in 2023. (New Expiration Date: 12/31/2023)
$0Addendum Adden #1-22 11/29/2022
CAG-22-161 DWR Security LLC. DBA Pono Security - Building Security - City Center
Parking Garage
$58,861 $214,824 P 5/16/2022 7/31/2023
Contractor: (062458) PONO SECURITY
5/16/2022
Adden #1-22 - DWR Security LLC. DBA Pono Security - Security
coverage for the downtown parking garage - time extension (New
Expiration Date: 12/31/2022)
$56,962Addendum Adden #1-22 10/27/2022
Adden #2-23 - PONO SECURITY - Downtown Parking Garage Security -
Time Extension (New Expiration Date: 07/31/2023)
$99,000Addendum Adden #2-23 3/9/2023
CAG-22-190 Carollo Engineers, Inc. - Long Range Wastewater Management Plan
Submittal and Support
$23,992 $49,950 P 5/31/2022 12/31/2023
Contractor: (013783) CAROLLO ENGINEERS PC
5/31/2022
Adden #1-23 - Carollo Engineers, Inc - Long Range Wastewater
Management Plan Submittal and Support (New Expiration Date:
12/31/2023)
$25,958Addendum Adden #1-23 3/9/2023
CAG-22-219 Reynolds General Contracting, Inc. - Renton City Hall - HR Tenant
Improvements Project
$383,148 $383,148 P 3/17/2023 12/31/2023
Contractor: (068090) REYNOLDS GENERAL CONTRACTING
3/17/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 47 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Public Works
CAG-22-237 Reynolds General Contracting - Renton Airport Office Renovation project -
243 Building
$679,800 $827,371 P 12/29/2022 12/31/2023
Contractor: (068090) REYNOLDS GENERAL CONTRACTING
12/29/2022
CO #1-23 - Reynolds General Contracting - Renton Airport Office
Renovation project - Pre-Abatement (New Expiration Date: 12/31/2023)
$13,647Change CO #1-23 2/10/2023
CO #2-23 - Reynolds General Contracting - Renton Airport Office
Renovation project - HAZ-MAT Abatement (New Expiration Date:
12/31/2023)
$28,369Change CO #2-23 2/10/2023
CO #4-23 - Reynolds General Contracting - Increase scope of work &
cost: Includes abatement of hazardous drywall & wall panel mastic.
HVAC pipe/connections found missing during the demo of ceilings.
Mechanical equip. not working properly. Replace furnace (New Expiration
Date: 12/31/2023)
$48,529ChangeCO #4-23 4/14/2023
CO #3-23 - Reynolds General Contracting - RENTON AIRPORT OFFICE
RENOVATION PROJECT - 243 BUILDING (New Expiration Date:
12/31/2023)
$4,862Change CO #3-23 4/17/2023
CO #5-23 - Reynolds General Contracting - Bollard and furniture removal
and disposal (New Expiration Date: 12/31/2023)
$8,740ChangeCO #5-23 6/8/2023
CO #6-23 - Reynolds General Contracting - HAZMAT Abatement &
HVAC (New Expiration Date: 12/31/2023)
$43,425Change CO #6-23 6/8/2023
CAG-22-244 McClure and Sons, Inc. - Filter Media Replacement - Maplewood Water
Treatment Plant Filter Media Replacement (WTR-27-3
$628,323 $628,323 P 11/16/2022 12/31/2023
Contractor: (048017) MCCLURE AND SONS INC
11/16/2022
CAG-22-343 HCON Incorporated - Sunset Gardens Off-Site Water Main Improvements
(WTR-27- 4199)
$879,534 $927,769 P 1/30/2023 12/31/2023
Contractor: (033165) HCON INCORPORATED
1/30/2023
CO #1-23 - HCON Incorporated - Sunset Gardens Off-Site Water Main
Improvements (WTR-27-4199) CO-01 (New Expiration Date: 12/31/2023)
$48,235Change CO #1-23 5/4/2023
CAG-22-390 Western Mechanical & Controls LLC - Replacement of Split Unit HVAC at
Liberty Park Admin Bldg.
$8,660 $8,660 P 12/12/2022 8/1/2023
Contractor: (090884) WESTERN MECHANICAL & CONTROLS
12/12/2022
CAG-22-391 Western Mechanical & Controls LLC - Fire Station #12 Split Unit Upgrade
for EOC Server Room from a 2 Ton to a 5 Ton
$28,562 $28,562 P 12/12/2022 8/1/2023
Contractor: (090884) WESTERN MECHANICAL & CONTROLS
12/12/2022
CAG-22-395 Johansen Construction Company, LLC - Emergency agreement to fix
sinkhole due to failed storm CMP at Talbot Rd S & S Renton Village Pl
$145,000 $145,000 P 12/28/2022 7/31/2023
Contractor: (039317) JOHANSEN CONSTRUCTION INC
12/28/2022
CAG-22-411 Apex Mechanical - Replacement of Both Centrifugal Pumps and Motors for
the Lazy River Feature at the Henry Moses Aquatic Center.
$54,483 $54,483 P 1/3/2023 12/31/2023
Contractor: (001075) APEX MECHANICAL LLC
1/3/2023
CAG-23-009 Core Tap Construction LLC - Agreement for the Side Sewer Connection
Repair at 2412 NE 9th PL
$27,481 $27,481 P 1/17/2023 7/12/2023
Contractor: (018402) CORE TAP CONSTRUCTION LLC
1/17/2023
CAG-23-015 Transpo Group - Design Agreement - South 7th Street Active Mode
Improvements project
$797,894 $797,894 P 3/9/2023 12/31/2023
Contractor: (082361) TRANSPO GROUP USA INC
3/9/2023
CAG-23-027 ORCA Pacific - Replacement of HMAC boiler #2 with a New Raypak boiler
and add ATS Controls to allow viewing of the boiler parameters
$62,070 $62,070 P 1/30/2023 12/31/2023
Contractor: (058124) ORCA PACIFIC INC
Minority Owned, Disadvantaged Business
1/30/2023
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 48 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Public Works
CAG-23-048 LASER UNDERGROUND - Thunder Hills Interceptor Rehabilitation $2,052,253 $2,052,253 P 6/2/2023 12/31/2023
Contractor: (043664) LASER UNDERGROUND
Women Owned
6/2/2023
CAG-23-071 SOUND CLEANING RESOURCE - Replace gutters and clean roofs at
City-owned locations
$63,708 $63,708 P 3/9/2023 7/31/2023
Contractor: (076031) SOUND CLEANING RESOURCE
3/9/2023
CAG-23-082 OSBORN CONSUL TING INC - Final Design of the SE 172nd St & 125th
Ave SE GSI Project
$132,614 $132,614 P 3/17/2023 12/31/2023
Contractor: (058414) OSBORN CONSULTING INC
3/17/2023
CAG-23-125 Installation of a New LNL-X3300 Panels at 4 City Locations; City Shop,
Facilities Shop, Senior Center, and Vehicle Evidence
$16,494 $16,494 P 4/4/2023 8/1/2023
Contractor: (043705) ENTRANCE CONTROLS
4/4/2023
CAG-23-126 Installation of 23 Card Access Door Systems and associated equipment at
City Hall and Public Work
$135,006 $135,006 P 4/5/2023 10/1/2023
Contractor: (043705) ENTRANCE CONTROLS
4/5/2023
CAG-23-164 PERKINS COIE LLP - Review of construction documents $20,000 $20,000 P 4/28/2023 12/31/2023
Contractor: (061142) PERKINS COIE LLP
4/28/2023
CAG-23-165 SEATTLE MODERN OFFICE LLC - Seattle Modern Office will assist the
city on space planning and design.
$34,500 $34,500 P 4/28/2023 12/31/2023
Contractor: (072638) SEATTLE MODERN OFFICE LLC
4/28/2023
CAG-23-174 City-wide window washing, pressure washing and gutter cleaning project $81,813 $81,813 P 5/9/2023 12/31/2023
Contractor: (001777) ALEXANDER MOORE HOMES
Minority Owned, Women Owned
5/9/2023
CAG-23-229 THREE RIVERS MOSQUITO & VECTOR - 2023 Mosquito Abatement
Program SWP-27-2000
$87,271 $87,271 P 6/14/2023 12/1/2023
Contractor: (081341) THREE RIVERS MOSQUITO & VECTOR
6/14/2023
CAG-23-231 GREAT FLOORS COMMERCIAL - Police 1st floor carpet replacement. $13,442 $13,442 P 6/14/2023 9/14/2023
Contractor: (013781) GREAT FLOORS COMMERCIAL
6/14/2023
CAG-23-237 FRESH FAMILY LLC - Removal of Awning and ensure Building Envelope
once removed at the Liberty Park Grandstand
$11,836 $11,836 P 6/15/2023 7/31/2023
Contractor: (056000) NOW ENVIRONMENTAL SERVICES INC
Women Owned
6/15/2023
LAG-19-005 Northwest Seaplanes Inc - Land & Building Lease at 608 W. Perimeter
Road
$0 $0 R 5/21/2019 10/31/2023
Contractor: UNKNOWN VENDOR
5/21/2019
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 49 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
ExecutedContract # Description Original Amt Current Amt Class Expiration
Public Works
LAG-99-002 Lease with Pro-Flight Aviation - Property located 350 feet west of and
parallel to the runway centerline. Adden #1 - Change in Sq foot & CPI
increase - revenue of $11,700.08
$39,190 $39,190 R 3/12/1999 7/31/2023
Contractor: (4328) 540 RENTON HANGAR LLC
3/12/1999
Adden #1-04 - Pro-Flight Aviation - Airport lease agreement - rate
increase $11,700.087 (Prevous Expiration Date: 12/31/2999 and New
Expiration Date: 12/31/2999)
$0Addendum Adden #1-04 11/12/2004
Adden #2-08, #3-09, #4-10 - Pro-Flight Aviation - periodic ground lease
adjustments (these were not previously entered in Eden). (Prevous
Expiration Date: 12/31/2999)
$0Addendum Adden #2-08, #3 10/26/2010
Adden #5-13 - 540 Renton Hangar LLC - lease rate adjustment
(Assignment of Lease from Pro-Flight Aviation to 540 Renton Hangar LLC
was effective 12/21/2010).
$0Addendum11/22/2013
Adden #6-16 - 540 Renton Hangar LLC - ground lease rate adjustment$0Addendum Adden #6-16 11/15/2016
Adden #7-18 - 540 Renton Hangar LLC - lease term extension (Prevous
Expiration Date: 07/31/2028 and New Expiration Date: 07/31/2023)
$0AddendumAdden #7-18 9/20/2018
171
$34,690,141
14
$7,757,887
185
$42,448,028
Total
TotalReceivablesPayablesPublic Works Subtotal
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 50 of 51
AGENDA ITEM #8. c)
Expiring Contracts Summary
For 07/01/2023 to 12/31/2023
432
$60,345,851
35
$9,289,063
25
$3,510
492
$69,638,424
Total
TotalMiscellaneousReceivablesPayablesGrand Total
\\EDEN\EdenReports\reports\SiteSpec\renton\Linked Reports\CM\contracts_executed.rpt
Data as of: 7/13/2023 9:09:19AM Printed: 7/13/2023 Page 51 of 51
AGENDA ITEM #8. c)
AB - 3388
City Council Regular Meeting - 07 Aug 2023
SUBJECT/TITLE: 2022 Joint Legislative Audit and Review Committee Public Records
Request Report
RECOMMENDED ACTION: None; Information Only
DEPARTMENT: City Clerk
STAFF CONTACT: Jason Seth, City Clerk
EXT.: 6502
FISCAL IMPACT SUMMARY:
N/A
SUMMARY OF ACTION:
Per Policy & Procedure 100-05, the City Clerk hereby submits the Joint Legislative Audit and Review
Committee (JLARC) Report for 2022. This report contains a number of measures used to audit and evaluate
the City's responsiveness to Public Records Requests from January 1, 2022 to December 31, 2022. A copy of
the attached report was submitted to the State of Washington. Highlights include:
Requests received: 4,348 (2021); 4,589 (2022)
Requests closed: 4,063 (2021); 3,504 (2022)
Median Number of Days to Final Disposition: 3 (2021); 7 (2022)
Number of Requests Denied in Full: 25 (2021); 120 (2022)
Estimated Total Staff Time in Hours: 31,702 (2021); 35,512 (2022)
Average Staff Time per Request: 7 (2021); 7 (2022)
Estimated Total Costs Incurred to Fulfill Records Requests: $753,957 (2021); $1,081,959 (2022)
EXHIBITS:
A. 2022 JLARC Report
STAFF RECOMMENDATION:
N/A
AGENDA ITEM #8. d)
AGENDA ITEM #8. d)
AGENDA ITEM #8. d)
AGENDA ITEM #8. d)
AGENDA ITEM #8. d)
AGENDA ITEM #8. d)
AGENDA ITEM #8. d)
AGENDA ITEM #8. d)
AB - 3395
City Council Regular Meeting - 07 Aug 2023
SUBJECT/TITLE: Street Vacation Request: Portion of Alley between N 31st St & N 32nd
St and Park Ave N & Burnett Ave N; Petitioner: Peterson; VAC-23-001
RECOMMENDED ACTION: Council Concur; Set Public Hearing on XX/XX/XXXX
DEPARTMENT: City Clerk
STAFF CONTACT: Jason Seth, City Clerk
EXT.: 6502
FISCAL IMPACT SUMMARY:
N/A
SUMMARY OF ACTION:
On July 10, 2023, a finalized street vacation petition (VAC-23-001) was submitted by Mark Peterson.
Community and Economic Development staff have reviewed and verified the validity of the petition. The
petitioner is requesting a portion of alleyway lying b etween N 31st St & N 32nd St and Park Ave N & Burnett
Ave N be vacated for safety and environmental reasons. The petitioner also believes it will preserve
neighborhood character. CED staff is requesting a public hearing to consider this matter be set on Se ptember
11, 2023.
A separate agenda bill will be submitted referring the item to the Transportation Committee after the public
hearing if Council accepts the petition and directs the petitioner to submit an appraisal of the right -of-way
being proposed for vacation.
EXHIBITS:
A. Petition
B. CED Verification Memo
C. Resolution Setting Public Hearing
STAFF RECOMMENDATION:
Adopt the resolution setting a public hearing on September 11, 2023 to consider the matter of vacating a
portion of right-of-way (ROW) located between N 31st St & N 32nd St and Park Ave N & Burnett Ave N.
AGENDA ITEM #8. e)
CITYOF RENTON
PETITION FOR STREET VACATION JUN 2023INTHECITYOFRENTON25
To the Honorable Mayor and Date J9 2'3;Rl_EECl;'-
llT<|'\SEC?
FF|CE
Members of the City Council
City of Renton Circulated By:(H I E 2
1055 S.Grady Way ~
Renton,WA 98055 Address:Q3 /3511KA|?
?
D M d C 'l M be 2earayoranounciemrs
Telephone:425.;/#2 .y
We,the undersigned property owners abutting a certain portion of public Right-of-Way,
respectfully request the vacation of the street or alleyway as described on the attached
“Exhibit A”and
commonly known as:N
’(Insert closest cross streets and referen the street name,Le.NE Bog Street from Bicycle Alley to Slalom Avenue NE.)UM8+8
We request a time and place be ?xed when this petition will be heard by the City Council.
Of the property owners abutting the area of this petition 82.%[2/3 or more required]of the
lineal frontage have agreed and indicated their joining this petition with their signatures
below:
.____;j_‘.-..-»(
A
signature signature
Q—Il’\(uC/)1-‘:1Hudcnj
print name phone print name phone
_W3/.rr 5 ‘Met_£2/am,Ll//‘l
address address
_L34-.2/0../651’
property identi?cation number property identi?cation number
Instructions:
1.Insert name of street.(i.e.NE 4th,alleyway east of Sunset Blvd.)
2.Attach complete legal description (i.e.metes and bounds,etc.)
3.Have the applicable property owners provide the following:
a)Sign name.(Signatures of owners of 2/3 of lineal frontage _I_nLtsign.
Spouses do not need to sign.Owners in common ?I_s_t_sign.)
b)Print name and phone number.
c)List Property address and King County tax parcel identi?cation number.
4.Attach a map to the petition designating the vacation boundaries.
Attach a brief statement of the purpose to be served by the street vacation.
6.Submi $2-59:09 ?ling fee with application.
5'40.-06
SUBMIT PETITION TO THE CITY CLERK,SEVENTH FLOOR,RENTON CITY HALL.
U‘:
PRM -Property Services Administration\Administrative\Forms\StreetVacation\StreetVacation Petition.doc
AGENDA ITEM #8. e)
0
The undersigned property owners request an ordinance abandoning the alley right-of-way extending
between N 31“&N 32n Streets and Park Ave N and Burnett Ave N
Signa?re 3 Signature
E'I§1g44,g:B5m[gg g/2-554-7347 20$€‘m.~nodaucaw 5mZ¥s?ou
Print name phone Print name phone
+Z2 15 Z ,M 1”-
Address Address
337;/0“3,335121015,36
property identi?cation number property identi?cation number
ca,.L,v\~o<5“———-—;>
Signature
I
Signature *1?QLVL 2/?ts5./3€7"€/“Sm;\§3\ci.\.,\g§ig,_.Em
Print name phone Print name phone
3/$5 Park Aveaxl 3w3"D5M Q
Address Address
3342/0/zg 31 3272/0/é?%
property identi?cation number property identi?cation number
Ignature «MW,if7 L‘,0 <g0(Signature
LmmA/g4/,1
Print name phone
lLo[N 51”’97’
Address Address
">‘5‘12/‘o/(poo 336‘?/0 /5521
property identi?cation number property identi?cation number
AGENDA ITEM #8. e)
?
The undersigned property owners request an ordinance abandoning the alley right-of-way extending
between N 31“&N 32n S ets and Park Ave N and Burnett Ave N
Signature Signature
fG:9 A,c EA}HA
Print name phone Print name phone
/2/A N 31*}:
Address 305,5)Address
property identi?cation number property identi?cation number
‘I ’
‘(Hing [unit/Lx?
Print name ,(“5'r(0»i7ge Print na e phone
HQQ Q J?l?kj??.ll’-3*3
Address Address
3 3512/0 /5 87 331Z/0/Q97
property identi?cation number property identi?cation number
Signature Signature
Print name phone Print name phone
Address Address
property identi?cation number property identi?cation number
AGENDA ITEM #8. e)
The undersigmd property 0 t
“e phone
[[01 &5Z’‘i,§7L52%I
Address
3 2/9/574
Printname phone
Address
property identi?cation number
Signature
Print name phone
Address
property identi?cation number
-rs request an ordinance abandoning the alley right—of-wayextending
-:*and/rkAyeNand Burnett Ave N
.1/
/
Signature
#5 75/mag
Print name phone
Address
property identi?cation number
Signature
Print name phone
Address
property identi?cation number
Signature
Print name phone
Address
property identi?cation number
AGENDA ITEM #8. e)
The undersigned property owners request an ordinance abandoning the alley right-of—wayextending
between N 315‘&N 32n Streets and Park Ave N and Burnett Ave N
J_«’i__;
Signature Signature
SUNIL swanPARIHAQe4£—771-W3a‘/‘J\‘|~:a9-OeLA/QWLsmite/im.s
Print name phone Print name phone
200 193 2247
iH‘=’=N3zr\L sew em 'wA ‘moss low,A;3;“;9,,,e¢,.;,,\c,,i «mad,
Address Address
33‘/2.101655
property identi?cation number property identi?cation number
Signature Qo(°_E/5-3..I 53¢Signature 3 \_”A9|A_;Arm “J HW__,_§
K/+TH/tktm/c.’Tau Ema “,3 &»,L.,(«’-4,1,
Print name phone Print name phone
VJ0 Zoo 79 2 22%1
"W N 32 ST iggzk A)32.‘;9 ?mlm u.4‘)?’054»
Address Address
33‘/2/pl 557
property identi?cation number property identi?cation number
phone
Address Address
%34\$\Q31659
property identi?cation number property identi?cation number
AGENDA ITEM #8. e)
The undersigned property owners request an ordinance abandoning the alley right—of—wayextending
between N 31“&N 32n Streets and Park Ave N and Burnett Ave N
Signature 0 N
Signature
ii/ll/In In/E)/14,44
Print name phone Print name phone
/2]§A//3221‘/95+1/zgzzé o7so
Address Address
334 [ow/0
property identi?cation number property identi?cation number
Signatu Signature
gg nqa E 420%£35 £24 ;"('54 Comécu
P 't ,,h P 't hrmname,7;2>_[9/‘$2327 rm name P one
-.*.1.4.19 -,,
/9-/"7 U.sa »»'s:—./,}~/2 u.5a -5143?»2974957
Address Address
gagat/0/z,L0 3532,/o/ge 20
property identi?cation number property identi?cation number
Signature Signature
Print name phone Print name phone
Address Address
property identi?cation number property identi?cation number
AGENDA ITEM #8. e)
v
If and when the City Council approves the Vacationat a public hearing,payment of a post-
hearing processing fee of $250.00 will be required.
print name
10/8/Vé/9*§Hep:)i£
address
gszmoe/zizé
property identi?cation number
signature
L4/‘(plea EL\\4'.‘..U (‘53”i€2£3/95-7c
print name phone
_/0/Z/9/’§‘7(Voe,7/’
address
2&4 2/9—/’+/;“
signature
print name phone
address
property identi?cation number
signature
print name phone
address
signature
print name phone
address
property identi?cation number
signature
print name phone
address
PRM -Property Services Administra?on\Administrative\Forms\StreetVacation\StreetVacation Petition.doc
AGENDA ITEM #8. e)
If and when the City Council approves the vacation at a public hearing,payment of a post-
hearing processing fee of $250.00 will be required.
‘
,_78g%nature
A c§6atWBu
print name H print name phone
5“2Q Q Z5f
address address
.P.r9I3e3Iv_i_<*_e:=t_if.'1<.=%1ti.°.n_I1u_n112*=_r_____________________-pr<2Iz<=£y.is1s=r2tifE9a3i9:1pslmbsz___________-_
signature
.
signature
print name phone print name phone
address address
.v.r929r£xid99£i€19a_ti°3l_I1u3912eI______________________1>r9I2<=I*!_i99I2tifE9a£i99Ilmbfr_____________
signature
.
signature
print name phone print name phone
address address
.P.r9I2e_r£v_i.d99£i1_i9a1ti.°31_r1u.n2*2e:______________________P59I2e£v.i99r3ti?<aa3i9:1swabs:...........--
PRM -Property Services Administration\Administntive\Forms\StreetVacation\StreetVacation Petition.doc
AGENDA ITEM #8. e)
If and when the City Council approves the vacation at a public hearing,payment of a post-
hearing processing fee of $250.00 will be required.
I
signature
V
(0
:3 M as.\‘.at “R36 (L57,
print name
7
phone
rd/dzzr’/V2/6*if
3'54/M0 ’/éé 5
signature
/70 SHAH?rm$25 -M2-<+av0
print name phone
430N M4‘81
address
~;‘642/0 //7 6 0
P_’9F_"E”Yid°“‘_“_i‘Ea.?_°"““"_“Ze_’_____._._______-
signature
print name phone
address
property identi?cationnu_mber ____________
(Jim/7,»
signature
Soaak Qmmak “iZ5—3CX0_(gL{®q
print name phone
[/24 /V3/56%
address
Z342/0//(?e?
property identi?cation number
signature
print name
.
phone
address
____I>I9I2°_rty_isi9r3téfE°_ati°nnuznbsz____________-
signature
print name phone
address
property identification number ______
PRM -Property Services Administration\Administrative\Forms\StreetVacation\StreetVacation Petitiomdoc
AGENDA ITEM #8. e)
If and when the City Council approves the vacation at a public hearing,payment of a post-
hearing processing fee of $250.00 will be required.
signature
O
signature
£/-95 L?!//ZCH}2m>)2y7—wa4\"K0“‘5
0 (’7’;«5‘>;z7/»
/‘757hprintnamephoneprintname
I
one
‘Mo xv.3/‘rsr raw/rv_:g.44 7;/c.<r4«€16 «V,-3//‘lg/f‘T [/14 7305¢,
address address /
signature
property identi?cation number
signature
print name phone
address
signature
print name phone
address
property_i_d_e{1t_if_icationn_u_rr_1l3e_r_______________
print name phone
address
property identi?cation number
signature
print name phone
address
pr<3r3er1_y_ig1<:-nti?catiogl_n_u{n_b_e:_____________
PRM —Property Services Administration\Administrative\Forms\StreetVacation\StreetVacation Petition.doc
AGENDA ITEM #8. e)
If and when the City Council approves the vacation at a public hearing,payment of a post-
hearing processing fee of $250.00 will be required.--
si ature signa
gm Lowas Z535 19°14N‘!0 €M\w<429755/3/7019
print name
7
_
phone print name phone
m;N35‘5+max).315*5*‘
address address
334Z(owl(/Is’J54zIo«:<n§
.I1r929r£xi.<1s=:1*_i£‘19‘=1ti.°.rl.*:u.rI2*z'=.r....................._i°r9129r*!_i99'1t£*E<aa:i99zlymbyz_____________
signature 0
print name phone print name phone
*/
’0/0304vi’?Stan‘aamsof 13
address address
.12r9I3e.r£y.£d_e:1£i£i9a:ti°31_I11an2*:eI______________________PI9rzeIt1_isi9r3t£f3<:a3i9:1Jlymbsz_____________
signature
‘
signature
517///ah I69/)_{(;y
print name
$4
phone print name =-phone
/(3%/V$1 97',’v9.5:10.1.3351
address address
i‘;‘fZL_0-MZE
_P_r913'~:IIv_i_<1.e:1t_if_'I9*2ti.°_n.r1u_“2lz'=_r______________________PI<2I2'=It!.i§9I3t£*3ea3i993mbs=£____________-
PRM -Property Services Administration\Administrative\Forms\StreetVacation\StreetVacation Petitiomdoc
AGENDA ITEM #8. e)
If and when the City Council approves the vacation at a public hearing,payment of a post-
hearing processing fee of $250.00 will be required.
signature (7!
.
(muss Cvvsbic105/40M
print name phone print name phone
gm A/,7“9*é?m Mi38054 M2 Maéfef
address address
€642/0 em95 3%!2/0 «MB;
.P.r9i.>€r£v_i_d_e£i£if_i9r1ti_°:1_r1ii_n2*2eI______________________PI9r2e!£¥.i99I:ti?9aIi9:iPymbsx_____________
siéa?reQ .
signature
print name phone print name phone
M my
address
?’W"‘¢(20643-312 342/0’/@310 a
property identi?cation number ___________r>_r<3rze_r1_y_igi<_rr_it§rjic_a3i_<>:in_u:n_b_er_____________
{'
sign re signature :
I
P
jzgll?Fmzirng Kama miammj5'377'%‘H0
print name
¢L
pho print name phone
11Z?/‘/4 /9 31‘7
address address
gzggro ~/goo 3212/0»/are
_v_r9r_><:r§y_id:=:i@tisa:ti°:i_r1iar2iz<=r______________________pr9r1€r£¥_i9s9t£*E9aIi99Iizlmbsz...........__
PRM -Property Services Administration\Administrative\Forms\StreetVacation\StreetVacation Petition.doc
AGENDA ITEM #8. e)
If and when the City Council approves the vacation at a public hearing,payment of a post-
hearing processing fee of $250.00 will be required.
signature
print name print name phone
6 -*LQ24 /V‘L 34
address address
@3742/0 ~/19 0
.I2r9ee_r£v_i_d5=9t.it’19%zti_°31_r1u3I312<=:______________________pI9r1e£v_i9912ti?9aIi99zwmbsz_____________
signature
'
signature
print name phone print name phone
address address
.rar91;-913:/_i.d_e11t_if39*1ti_°11_r1u:r3'2‘=3_______________________PI‘2E°E3’_i£‘S”3‘§?€"Ei9PPM”?!___________-_
signature
.
signature
print name phone print name phone
address address
,r:r9r_><:11v.i.d_e9t_if_'I<_=%1ti.°_r1_r1u_rr112e_r_______________________Pr912e£y_i99r3ti?<za3i99Pslmbft...........--
PRM —Property Services Administration\Administrative\Forms\StreetVacation\StreetVacationPetition.doc
AGENDA ITEM #8. e)
If and when the City Council approves the vacation at a public hearing,payment of a post-
hearing processing fee of $250.00 will be required.
signature
-//l ‘J ’\O[gt/me;Z-ceclvxeilV “
print name phone print name phone
(/111/313.?it
address address
_,..342%2/0 -1 >235
.r1r9I3<:r£v_i_d:=:*£if.i9*1ti.°:1.'1u_n2*2e_r_______________________I=:<2rze_rt_v_isis=r2tif3°_a3i9:Ipymbsz_________--
signature signature
print name phone print name phone
address address
_P.'9B‘E’EY_id99£i*39%ti_°P.r1u?2*2eI______________________PI‘2F1eEY_iS"E‘}‘if§Ea}i9{‘P991”?!_____________
signature signature
print name phone print name phone
address address
_P_r92'2r£y_i_d_e9t_if_'1sa_ti_°:1_'1u_rr212er_______________________PI9Ee:t!.i999t3?9aIi99."9mb:=£_____________
PRM -Property Services Administr-ation\Administrative\Forms\StreetVacation\StreetVacationPctitiomdoc
AGENDA ITEM #8. e)
The undersigned property owners request an ordinance abandoning the alley right—of—wayextending
between N 315‘&N 32n Streets and Park Ave N and Burnett Ave N
Signature Signature
Ni(Die 1 ?fad La V 20¢‘-}qS/'
Print name phone Print name phone
j0‘7 N.3 ‘?r.Kevrim\/Y)l‘iX<17(a
Address Address
33%’Zia/S20
property identi?cation number property identi?cation number
Signature Signature
Brod.Lm\<c.r\2o(,,~%I°:~«§1to
Print name phone Print name phone
‘io?N 32$5+.Rervib?ooa
Address 990%Address
331+210 6910
property identi?cation number property identi?cation number
Signature Signature
Print name phone Print name phone
Address Address
property identi?cation number property identi?cation number
AGENDA ITEM #8. e)
Jaqumu uoueagguapg Auadmd Jaqwnu uogeagnuapg Auadmd
W92;\0\1F<£‘E
sseuppv ssa.Ippv
'-7»<,09b¥0’\’C<_LmU?’t&9:2mmWW H
auoqd aweu mud auoqd aweu mud
(£8)1-C561/°73C‘c:p?\?\7L9MW]
aJn1eu8gs
V
H
aJn;éu8gs
Jaqumu uogeogpuapg Auadmd Jaqumu uopeaguuapg Auadmd
?/337a/75%z9g 03 \1 1 V4,,
o?<3<?32.7 ssaJppv ssmppv
“W07 3 +§r'W/W7?
auoqd aweu mud
L/QC’?HQ 2"!/(W772i
\
3Jn1BU3_|S
Jaqwnu uogeognuapg Au$doJd Jaqwnu uoueagguapg A1JadoJd
O°).Slo["c‘1-_.S.ui?21 0/75/orchii
sseuppv sseuppv
+3 ')9u‘C£N mm 75035WW/va-«V35!‘FISH tool
auoqd aweu mud auoqd aweu mudQnv?aoz 541%?123.1,039702 74 ‘AIMEE:/WMVC,
V
amuau?gs axmeu?gs
N a/xv naumg pue N am med pue s1aa.us uzg N 131519N use/maq
BugpuaxxaAeM-;o-1q8g.IAaneamSuguopueqe a3ueugpJo ue 1sanbaJsJauMo Auadmd pauSgsJapun aql
AGENDA ITEM #8. e)
The undersigned property owners request an ordinance abandoning the alley right-of-way extending
between N 31“&N 32n Streets and Park Ave N and Burnett Ave N
Signature Signature
E:94 m;7(o V 1;k _s:gs='zz’7-35%
Print name phone Print name phone
‘7/5
Address
7”’S7//W Z5
property identi?cation number
Signature
Print name phone
Address
property identi?cation number
Signature
Print name phone
Address
property identi?cation number
property identi?cation number
Signature
Print name phone
Address
property identi?cation number
Signature
Print name phone
Address
property identi?cation number
AGENDA ITEM #8. e)
EXHIBIT"A"
LEGALDESCRIPTION
The following described alley to wit:
An alley right—of-way,having width of 12 feet,running in an east-west direction through block 15,C.D.
Hi||man’s Lake Washington Garden of Eden Division No.1,as recorded in Volume 11 of plats,page 63,
records of King County,Washington;and lying westerly of the westerly right—of-wayline of Park Avenue
North,extended and easterly of the southerly extension of the west line of Lot 3,Block 15 from the
southwest corner of Lot 3 to the northwest corner of Lot 48,Block 15,of said plat.
As situated within the southwest ‘ASection 32,Township 24 N.,Range 5 E.,W.M.
VACATIONAREA
.IIII lllllllllllllllllllllwng
-i—----...V-,--......._,..-.__.,_,_w________
_‘__________
____‘____l_‘V
_.__N __.-‘mm.a
_
v‘*".-.-H--1.".............-..
I.-1..‘'.
)..2?V
*4.
I
5
ll}!!!...-......-.-........-....._,.,.......-......,'
I
'_,,,__,g,“(L
I
-.-........._..-...-..-_..-..--.---..._..._.,,.._
I .--I_“\,
f .\to t
'
3-3
0 -I '
I .‘
,u iI/llII//IIIIIIIII/I/III/I//IIIIIIIIIIIIII/IIIIII:s
,.
:v A»‘.
‘
a,...-....._.-.-..-.....-.._..-.....-._.-.....
_w’_._-_....-...-.......-.-.-.-..-....-....-_..-.-.--_...-.-..,..4;..I
AGENDA ITEM #8. e)
EXHIBIT"B"MAP AGENDA ITEM #8. e)
EXHIBIT"C"
PUBLICBENEFITEXPLANATION
While this alley right—of-wayhas been part of the plat since 1904,it has not been used as such for several
decades.The following points justify our request for abandonment:
Safety:
The eastern alley access to Park Avenue North would be within a few feet of the summit of a hill
where there are already sight—lineissues for cars pulling off 31“and 32"“streets.
The existing western stub—al|eyaccess to Burnett Ave N has sight—lineissues imposed by the
adjoining property fence.
Orienting garages onto alleys imposes greater turning clearance issues for cars accessing those
garages.
Street—facinggarages and driveways provide more parking,keeping vehicles off the street.
Alleys increase the potential for burglaries and other crimes.The Arizona State University Center
for Problem-Oriented Policing stated in their 2005 publication Response Guide No.2:"Reducing
through—traffic by closing streets or alleys means that...burg|ars cannot so easily gain access to
properties,especially from alleys behind houses”.
The current street grid contains street-lighting.While lack of lighting in alleys poses safety and
security issues,placement of street lighting in alleys will be an additional degradation of privacy,
as it shines into yards and bedroom windows.
Illegal dumping occurs on a regular basis in the neighborhood.An alley creates additional
opportunities for illegal dumping with less likelihood of being seen and reported.
Neighborhood Character:
Most of the alley rights—of—wayin lower Kennydale have previously been granted abandonments.
Requiring the establishment of an alley here constitutes disparate treatment for homeowners in
this block and is inconsistent with the character of the neighborhood.New homes in the other
blocks in lower Kennydale have garages oriented to the street while still accommodating the
City's desire to establish sidewalks.
Renton Community and Economic Development Director Chip Vincent told the Council in 2013
that the Administrative Code interpretation regarding garages and parking areas to the rear is
’’principally for new development in new subdivisions and would not be applied to individual
log”[Renton City Council Minutes,Page 282,September 16,2013].
Other homes built recently have not been required to open alleys,even in one case where an
physical alley exists.
Environment:
The establishment of an alley will remove a substantial quantity of large,mature trees and
reduce bird habitat.
The establishment of an alley will increase non—permeable surfaces and result in groundwater
drainage issues.
Abutting property owners have improved the right—of-wayarea,relieving the City of a
maintenance burden.
Establishing an alley would eliminate the sense of peace,tranquility,and safety currently
enjoyed by homeowners and renters in this block.
AGENDA ITEM #8. e)
1.0
September 16.2013 Kenton city CouncilMinutes Page 282
AGENDA ITEM #8. e)
King County Data as of:06/15/2023SevenLineReport
Number of Properties:45
Owner Name:Teclemicael I Habto Year Built/Eff:1946/
Site Address:901 N 32nd St,Renton,WA 98056 LivingArea:1,150
Mailing Address:351 Pasco Dr NE,Renton,WA 98059 Lot Area /Acres:5,100 /0.12
Legal Description:Hillmans Lk Wn Garden Of Eden #1 Plat Block:15 Plat Lot:1 Res I Comm Units:1 I
APN:334210-1510 Land Use:SFR Bedrooms:4
Salel Rec Date:03/31/2021 /04/16/2021 Sale Price /Type:$569,000 I Baths (F I H):1 /
Assessed Value:$592,000 Land Value:$592,000 Improvement Value:
Owner Name:Straight ArrowHomes LLC Year Built/Eff:2023/
Site Address:905 N 32nd St,Renton,WA 98056 LivingArea:3,510
Mailing Address:12015 NE 8th St #5,Bellevue,WA 98005 LotAreaI Acres:5,025 I 0.12
Legal Description:Hillmans Lk Wn Garden Of Eden #1 Less St Per Rec#20220506001579 Pl...Res I Comm Units:
APN:334210-1511 Land Use:SFR Bedrooms:4
Salel Rec Date:03/26/2021 /04/07/2021 Sale Price /Type:$559,000/Baths (Fl H):2/1
Assessed Value:$592,000 Land Value:$592,000 Improvement Value:
Owner Name:Larkin,Bradford William/Larkin,Nicole M Year Built/Eff:1910 I 2014
Site Address:909 N 32nd St,Renton,WA 98056 LivingArea:1,950
Mailing Address:1005 N 33rd Pl,Renton,WA 98056 Lot Area I Acres:5,100 I 0.12
Legal Description:HillmansLk Wn Garden Of Eden #1 Plat Block:15 Plat Lot:3 Res /Comm Units:1 I
APN:334210-1520 Land Use:SFR Bedrooms:3
Sale I Rec Date:01/08/2023 I 01/09/2023 Sale Price I Type:$865,000/Baths (F I H):2/0
Assessed Value:$932,000 Land Value:$585,000 Improvement Value:$347,000
Owner Name:Pavlik,BeatriceJ Year Built /Eff:2019/
Site Address:915 N 32nd St,Renton,WA 98056 LivingArea:3,130
Mailing Address:16261 SE 7th St,Bellevue,WA 98008 Lot Area /Acres:5,025 /0.12
Legal Description:HillmansLk Wn Garden Of Eden #1 Less Por For Rd Per Deed Rec#201805...Res I Comm Units:1 /
APN:334210-1525 Land Use:SFR Bedrooms:5
Salel Rec Date:01/10/1995 I 01/12/1995 Sale Price IType:$122,000/Baths (Fl H):2 /0
Assessed Value:$1,404,000 Land Value:$585,000 Improvement Value:$819,000
Owner Name:Estes,Scott Arnold Year Built/Eff:1954/
Site Address:921 N 32nd St,Renton,WA98056 Living Area:1,300
Mailing Address:921 N 32nd St,Renton,WA 98056 Lot Area I Acres:10,200 /0.23
Legal Description:Hillmans Lk Wn Garden Of Eden If 1 Res I Comm Units:1 I
APN:334210-1530 Land Use:SFR Bedrooms:3
Sale /Rec Date:07/13/2006 /07/14/2006 Sale Price I Type:$231,800 IConfirmed Baths (F/H):1 /0
Assessed Value:$994,000 Land Value:$801,000 Improvement Value:$193,000
Owner Name:Dominik,Damian M/Dominik,Marzena K Year BuiltI Eff:1908/1946
Site Address:1001 N 32nd St,Renton,WA 98056 LivingArea:900
Mailing Address:1001 N 32nd St,Renton,WA 98056 Lot Area /Acres:8,670 I 0.20
Legal Description:Hillmans Lk Wn Garden Of Eden #1 7 &8 Less E 15 Ft Res /Comm Units:1 I
APN:334210-1540 Land Use:SFR Bedrooms:2
Sale I Rec Date:10/07/2008/10/16/2008 Sale Price /Type:$345,900 /Confirmed Baths (F I H):1 /0
Assessed Value:$682,000 Land Value:$615,000 Improvement Value:$67,000
Owner Name:Dudgeon,Michael I Dudgeon,Dianne Year Built/Eff:1951 I
Site Address:1007 N 32nd St,Renton,WA 98056 Living Area:1,630
Mailing Address:1007 N 32nd St,Renton,WA 98056 Lot Area /Acres:6,630 I 0.15
Legal Description:Hillmans Lk Wn Garden Of Eden #1 E 15 Ft Of 8 &AllOf 9 Res I Comm Units:1 I
APN:334210-1546 Land Use:SFR Bedrooms:3
Salel Rec Date:01/29/2002 /01/31/2002 Sale Price /Type:$242,000 /Confirmed Baths (F /H):2/0
Assessed Value:$872,000 Land Value:$598,000 Improvement Value:$274,000
‘ML 0 2023 DATATRACEINFORMATIONSERVICESLLCAND/ORITSAFFILIATES.ALLRIGHTSRESERVED.PAGE 1 OF 6
HAINIERTITLE
AGENDA ITEM #8. e)
10
ll
12
13
14
15
Owner Name:
Site Address:
MailingAddress:
Legal Description:
APN:
Sale I Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Sale I Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Sale I Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Salel Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
AFN:
Sale I Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Sale I Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Sale I Rec Date:
Assessed Value:
Owner Name:
Site Address:
MailingAddress:
Legal Description:
APN:
Salel Rec Date:
Assessed Value:
.at..m:-...
RAINIEFITWLE
Straight ArrowHomes LLC
1013 N 32nd St,Renton,WA 98056
Po Box 3946,Bellevue,WA 98009
Hillmans Lk Wn Garden Of Eden #1 Plat Block:15 Plat Lot:10
334210-1555 Land Use:Vacant -Residential L...
04/19/2023 /04/27/2023 Sale Price I Type:$900,000 I
$585,000 Land Value:$585,000
Straight Arrow Homes LLC
WA
Po Box 3946,Bellevue,WA98009
Hillmans Lk Wn Garden Of Eden #1 Plat Block:15 Plat Lot:11
334210-1557 Land Use:Vacant -Residential L...
04/19/2023 I 04/27/2023 Sale Price I Type:$900,000/
$585,000 Land Value:$585,000
Toppano,Gina M
1019 N 32nd St,Renton,WA 98056
1019 N 32nd St,Renton,WA 98056
Hillmans Lk Wn Garden Of Eden #1 Plat Block:15 Flat Lot:12
334210-1560 Land Use:SFR
04/20/2002 I 04/23/2002 Sale Price I Type:$434,000 I Confirmed
$1,112,000 Land Value:$585,000
Baker,Aaron L
1025 N 32nd St,Renton,WA 98056
1025 N 32nd St,Renton,WA 98056
HillmansLk Wn Garden Of Eden #1 Plat Block:15 Plat Lot:13
334210~1565 Land Use:SFR
05/13/2016 I 05/17/2016 Sale Price I Type:$611,111 I
$1,026,000 Land Value:$585,000
Galvin,Gary C I Galvin,Sharon L
1101 N 32nd St,Renton,WA 98056
1101 N 32nd St,Renton,WA 98056,(No Mail)
Hillmans Lk Wn Garden Of Eden #1 Plat Block:15 Plat Lot:14
334210-1574 Land Use:SFR
02/10/1997 I 02/12/1997 Sale Price I Type:$156,450 I
$886,000 Land Value:$585,000
Uppal,Hardip Singh
1105 N 32nd St,Renton,WA 98056
1105 N 32nd St,Renton,WA 98056
Hillmans Lk Wn Garden Of Eden #1 Plat Block:15 Flat Lot:15
334210-1575 Land Use:SFR
02/26/1991 I 02/28/1991 Sale Price I Type:$95,000/
$897,000 Land Value:$585,000
Freeman,James J
1109 N 32nd St,Renton,WA 98056
4741 193rd Pl SE,lssaquah,WA 98027
Hillmans Lk Wn Garden Of Eden #1 Plat Block:15 Flat Lot:16
334210-1585 Land Use:SFR
05/18/1993 I 05/20/1993 Sale Price I Type:$118,000 I
$690,000 Land Value:$585,000
Parihar,Sunil S I Parihar,Pallavi Sin
1115 N 32nd St,Renton,WA 98056
1115 N 3rd St,Renton,WA 98056
HillmansLkWn Garden Of Eden #1 Plat Block:15 Plat Lot:17
334210-1590 Land Use:SFR
01/19/2011 I 01/20/2011 Sale Price I Type:$450,000 I Confirmed
$1,318,000 Land Value:$644,000
Year BuiltI Eff:
LivingArea:
LotArea I Acres:
ResIComm Units:
Bedrooms:
Baths (FI H):
Improvement Value:
Year Built I Eff:
LivingArea:
Lot Area I Acres:
Res/Comm Units:
Bedrooms:
Baths (F I H):
improvement Value:
Year Built/Eff:
LivingArea:
Lot Area I Acres:
Res I Comm Units:
Bedrooms:
Baths (F I H):
improvement Value:
Year Built I Eff:
Living Area:
Lot Area I Acres:
Res I Comm Units:
Bedrooms:
Baths (FI H):
Improvement Value:
Year Built /Eff:
LivingArea:
Lot AreaI Acres:
Res I Comm Units:
Bedrooms:
Baths (F I H):
Improvement Value:
Year Built I Eff:
Living Area:
Lot Area I Acres:
Res I Comm Units:
Bedrooms:
Baths (FI H):
Improvement Value:
Year Built I Eff:
Living Area:
Lot Area I Acres:
Res I Comm Units:
Bedrooms:
Baths (F I H):
Improvement Value:
Year Built I Eff:
Living Area:
Lot Area I Acres:
Res I Comm Units:
Bedrooms:
Baths (F I H):
Improvement Value:
(0 2023 DATATRACEINFORMATIONSERVlCESLLCANDIOR ITSAFFILIATES.ALLRIGHTSRESERVED.
0
5,100 I 0.12
0
5,100 I 0.12
2001 I
2,570
5,100 I 0.12
1 I
3
2 I 1
$527,000
1949/2007
1,900
5,100/0.12
1/
3
2/0
$441,000
1975/
1,890
5,100/0.12
1/
4
1 I 1
$301,000
1975/
1,420
5,100/0.12
1/
3
1/1
$312,000
1935/1957
1,220
5,100/0.12
1/
3
1/0
$105,000
1994/
2,610
5,100 I 0.12
1 I
3
2/1
$674,000
PAGE2 OF 6
AGENDA ITEM #8. e)
16
17
18
19
20
21
22
23
Owner Name:
Site Address:
MailingAddress:
Legal Description:
APN:
Sale /Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Sale!Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Salel Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Sale /Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Salel Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Sale /Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Sale /Rec Date:
Assessed Value:
Owner Name:
Site Address:
MailingAddress:
Legal Description:
APN:
Salel Rec Date:
Assessed Value:
Sterling,Katharine K
1119 N 32nd St,Renton,WA 98056
1119 N 32nd St,Renton,WA 98056
Hillmans Lk Wn Garden Of Eden #1 Plat Block:15 Plat Lot:18
334210-1595 Land Use:SFR
12/09/2002 /12/11/2002 Sale Price I Type:$221,000 /Confirmed
$756,000 Land Value:$585,000
Goldfarb,LoriI Myers,Jeff
1125 N 32nd St,Renton,WA 98056
1125 N 32nd St,Renton,WA 98056
HillmansLk Wn Garden Of Eden if 1 Flat Block:15 Plat Lot:19
334210-1596 Land Use:SFR
11/23/2007 I 11/30/2007 Sale Price /Type:$339,950 /Confirmed
$746,000 Land Value:$644,000
Nealy,Linda G
1201 N 32nd St,Renton,WA98056
1201 N 32nd St,Renton,WA 98056
HillmansLk Wn Garden Of Eden #1 Plat Block:15 Plat Lot:20
334210-1600 Land Use:SFR
05/19/2004 /05/21/2004 Sale Price /Type:$255,000 /Confirmed
$725,000 Land Value:$585,000
Hattatoglu,Goren C
1211 N 32nd St,Renton,WA 98056
1211 N 32nd St,Renton,WA98056
Hillmans Lk Wn Garden Of Eden #1 Less N 1.5 Ft Of Lot 21 Per City Of Rento...
334210-1605 Land Use:SFR
07/25/2001 /07/27/2001 Sale Price /Type:$295,000 /Confirmed
$1,057,000 Land Value:$644,000
Cunningham,Terry L
1215 N 32nd St,Renton,WA 98056
1215 N 32nd St,Renton,WA 98056,(No Mail)
Hillmans Lk Wn Garden Of Eden #1 Plat Block:15 Plat Lot:22
334210-1610 Land Use:SFR
Sale Price /Type:
$1,070,000 Land Value:$667,000
Conger,Barry F /Conger,Patricia E
1217 N 32nd St,Renton,WA 98056
1217 N 32nd St,Renton,WA 98056
Hillmans Lk Wn Garden Of Eden #1 Lot 23 &W 10 Ft Lot 24
334210-1620 Land Use:SFR
05/07/2008 I 05/16/2008 Sale Price /Type:$526,202 /Confirmed
$1,182,000 Land Value:$673,000
Pederson,Lyle J /Pederson,Rosalyn K
3113 Park Ave N,Renton,WA 98056
28851 140th Ave SE,Auburn,WA 98092
Hillmans Lk Wn Garden Of Eden #1 Lots 24 &25 Less W 10 Ft Of Lot 24
334210-1630 Land Use:SFR
07/05/2018 /07/27/2018 Sale Price /Type:$413,570 I
$1,018,000 Land Value:$673,000
Peterson,Mark S I Peterson,Michele L
3103 Park Ave N,Renton,WA 98056
3103 Park Ave N,Renton,WA 98056
Hillmans LkWn Garden Of Eden #1 Plat Block:15 Plat Lot:26
334210-1634 Land Use:SFR
05/03/2003 /05/06/2003 Sale Price /Type:$235,000 /Confirmed
$877,000 Land Value:$585,000
Year Bui|t/Eff:
Living Area:
Lot Area /Acres:
Res /Comm Units:
Bedrooms:
Baths (Fl H):
improvement Value:
Year Built /Eff:
LivingArea:
Lot Areal Acres:
Res I Comm Units:
Bedrooms:
Baths (F /H):
Improvement Value:
Year Built /Eff:
LivingArea:
Lot Area /Acres:
Res I Comm Units:
Bedrooms:
Baths (Fl H):
Improvement Value:
Year Built/Eff:
LivingArea:
Lot Area I Acres:
Res /Comm Units:
Bedrooms:
Baths (F I H):
improvement Value:
Year Built/Eff:
LivingArea:
Lot Areal Acres:
Res /Comm Units:
Bedrooms:
Baths (F I H):
Improvement Value:
Year BuiltI Eff:
LivingArea:
Lot Area/Acres:
Res/Comm Units:
Bedrooms:
Baths (Fl H):
Improvement Value:
Year Built /Eff:
Living Area:
Lot Area /Acres:
Res I Comm Units:
Bedrooms:
Baths (F /H):
Improvement Value:
Year Built /Eff:
LivingArea:
Lot Area/Acres:
Res /Comm Units:
Bedrooms:
Baths (F /H):
Improvement Value:
©2023 DATATRACEINFORMATIONSERVICESLLCAND/OR ITSAFFILIATES.ALLRIGHTSRESERVED.
1972/
1,020
5,100 /0.12
1/
3
1/0
$171,000
1918/1968
810
5,100/0.12
1/
2
1/0
$102,000
1972/
1,020
5,100/0.12
1/
3
1/0
$140,000
1995/
2,200
5,025/0.12
1/
3
1 I 1
$413,000
1997 /
1,990
5,100 /0.12
1 /
3
2/1
$403,000
1995/
2,640
6,120 /0.14
1 I
3
2 I 1
$509,000
1961/
1,950
9,180/0.21
1/
4
1/0
$345,000
1943/1976
1,620
5,100 /0.12
1 I
2
1 /0
$292,000
PAGE3 OF 6
AGENDA ITEM #8. e)
24
25
26
27
28
29
30
31
Owner Name:
Site Address:
MailingAddress:
Legal Description:
APN:
Salel Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Sale I Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Sale I Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
AFN:
Salel Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Sale I Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Sale I Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Salel Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Sale I Rec Date:
Assessed Value:
j...£:~...RAINIERTTTLE
Bednarz,Gallardol Bednarz,Bryan
1222 N 31st St,Renton,WA 98056
1222 N 31st St,Renton,WA98056
Hillmans Lk Wn Garden Of Eden #1 Plat Block:15 Plat Lot:27
334210-1635 Land Use:SFR
10/28/2013 I 10/31/2013 Sale Price I Type:$485,000 I
$1,297,000 Land Value:$585,000
Pernaa,Gary
1216 N 31st St,Renton,WA 98056
Po Box2521,Renton,WA 98056
HillmansLk Wn Garden Of Eden #1 Plat Block:15 Plat Lot:28
334210-1645 Land Use:SFR
Sale Price I Type:
$700,000 Land Value:$585,000
Carter,Micah
1212 N 31st St,Renton,WA98056
1212 N 31st St,Renton,WA 98056
HillmansLk Wn Garden Of Eden if 1 Flat Block:15 Flat Lot:29
334210-1650 Land Use:SFR
12/26/2000/12/28/2000 Sale Price I Type:$183,200/
$696,000 Land Value:$585,000
Washingtonia Property Manag
1206 N 31st St,Renton,WA 98056
4621 88th Ave SE,Mercer lsland,WA 98040
Hillmans Lk Wn Garden Of Eden #1 Plat Block:15 Flat Lot:30
334210-1655 Land Use:SFR
05/18/2015 I 05/28/2015 Sale Price I Type:$315,000/
$784,000 Land Value:$585,000
Andrew,Bernice E
1202 N 31st St,Renton,WA 98056
1202 N 31st St,Renton,WA 98056
HillmansLk Wn Garden Of Eden #1 Plat Block:15 Plat Lot:31
334210-1660 Land Use:SFR
07/20/2002 I 07/23/2002 Sale Price I Type:$225,000 I Confirmed
$735,000 Land Value:$585,000
Crosbie,Curtiss Ross Brian I Crosbie,Kari Michelle
1124 N 31st St,Renton,WA 98056
1106 N 31st St,Renton,WA 98056
Hillmans Lk Wn Garden Of Eden #1 Plat Block:15 Plat Lot:32
334210-1665 Land Use:SFR
08/06/2021 I 08/09/2021 Sale Price I Type:$1,220,000 I
$1,456,000 Land Value:$585,000
Fruehling,Jacobl Fruehling,Karina
1120 N 31st St,Renton,WA 98056
1120 N 31st St,Renton,WA 98056
Hillmans Lk Wn Garden Of Eden #1 Flat Block:15 Plat Lot:33
334210-1666 Land Use:SFR
07/11/2013 I 07/15/2013 Sale Price I Type:$599,000 I
$1,468,000 Land Value:$585,000
Lykken,Jeff
1116 N 31st St,Renton,WA 98056
1116 N 31st St,Renton,WA 98056
HillmansLk Wn Garden Of Eden #1 Plat Block:15 Plat Lot:34
334210-1670 Land Use:SFR
Sale Price I Type:
$1,207,000 Land Value:$585,000
Year BuiltI Eff:
LivingArea:
Lot AreaI Acres:
Res I Comm Units:
Bedrooms:
Baths (F/H):
Improvement Value:
Year BuiltI Eff:
LivingArea:
Lot Area I Acres:
Res I Comm Units:
Bedrooms:
Baths (F I H):
Improvement Value:
Year Built/Eff:
LivingArea:
Lot Area I Acres:
Res I Comm Units:
Bedrooms:
Baths (F I H):
Improvement Value:
Year Built I Eff:
Living Area:
Lot Area I Acres:
Res I Comm Units:
Bedrooms:
Baths (F I H):
improvement Value:
Year Built I Eff:
LivingArea:
Lot Area I Acres:
Res I Comm Units:
Bedrooms:
Baths (F I H):
Improvement Value:
Year BuiltI Eff:
LivingArea:
Lot AreaI Acres:
Res I Comm Units:
Bedrooms:
Baths (F/H):
Improvement Value:
Year Built/Eff:
Living Area:
Lot Area I Acres:
Res I Comm Units:
Bedrooms:
Baths (F/H):
Improvement Value:
Year Built I Eff:
LivingArea:
Lot AreaI Acres:
Res I Comm Units:
Bedrooms:
Baths (F I H):
Improvement Value:
O 2023 DATATRACEINFORMATIONSERVICESLLCAND/OR ITSAFFILIATES.ALLRlGHTSRESERVED.
2002/
2,710
5,100 I0.12
1/
3
2/1
$712,000
1946/
1,140
5,100 I 0.12
1/
3
1/0
$115,000
1970/
950
5,100 I 0.12
1/
3
1/0
$111,000
1970/
1,210
5,100 I 0.12
1/
3
1/0
$199,000
1970/1990
960
5,100/0.12
1/
3
1/0
$150,000
2013/
3,200
5,100 I0.12
1/
4
2/1
$871,000
2013 I
3,040
5,100 I 0.12
1 I
4
2/0
$883,000
2004/
3,270
5,100 I 0.12
1 I
4
2/1
$622,000
PAGE 4 OF 6
AGENDA ITEM #8. e)
32
33
34
35
36
37
38
39
Owner Name:
Site Address:
MailingAddress:
Legal Description:
APN:
Sale I Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Sale/Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Sale/Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Sale/Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Sale /Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Sale/Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
AFN:
Sale/Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Sale/Rec Date:
Assessed Value:
Loulias,Kim N I Loulias,Gretchen P
1112 N 31st St,Renton,WA 98056
1112 N 31st St,Renton,WA 98056
Hillmans Lk Wn Garden Of Eden #1 Plat Block:15 Plat Lot:35
334210-1675 Land Use:SFR
06/17/2004 I 06/21/2004 Sale Price /Type:$459,950 /Confirmed
$1,152,000 Land Value:$585,000
Crosbie,Curtiss /Crosbie,Kari
1106 N 31st St,Renton,WA 98056
1106 N 31st St,Renton,WA98056
Hillmans Lk Wn Garden Of Eden #1 Flat Block:15 Plat Lot:36
334210-1685 Land Use:SFR
03/04/2013 /03/08/2013 Sale Price /Type:$650,000 /
$1,414,000 Land Value:$585,000
Martinez,Chris M /Martinez,Kuyanna
1100 N 31st St,Renton,WA98056
1100 N 31st St,Renton,WA 98056
HillmansLk Wn Garden Of Eden #1 Flat Block:15 Plat Lot:37
334210-1687 Land Use:SFR
02/05/2016 /02/08/2016 Sale Price /Type:$589,900 I
$1,392,000 Land Value:$585,000
Bonaci,Gordon R
1036 N 31st St,Renton,WA 98056
5011 120th Ave SE,Bellevue,WA 98006
Hillmans Lk Wn Garden Of Eden #1 38 &E 1/2 Of 39
334210-1693 Land Use:SFR
06/29/2017 /07/11/2017 Sale Price /Type:$500,000 /
$947,000 Land Value:$608,000
Mcconville,James J /McConville,Diane
1030 N 31st St,Renton,WA 98056
1030 N 31st St,Renton,WA 98056
Hillmans Lk Wn Garden Of Eden #1 W 25 Ft Of 39 &E 35 Ft Of 40
334210-1696 Land Use:SFR
Sale Price /Type:
$755,000 Land Value:$592,000
Terpay,Pavel
1024 N 31st St,Renton,WA 98056
26115 126th Ave SE,Kent,WA98030
Hillmans Lk Wn Garden Of Eden #1 W 15 Ft Of 40 &All 41
334210-1700 Land Use:SFR
06/05/2023 /06/08/2023 Sale Price /Type:$695,000 /
$796,000 Land Value:$598,000
Ewald,Linda Susan /Ewald,Cohrt T
1018 N 31st St,Renton,WA 98056
11330 DiamondBack Way,Grass Valley,CA 95945
Hillmans Lk Wn Garden Of Eden if 1
334210-1715 Land Use:SFR
03/22/2021 /03/25/2021 Sale Price /Type:$1,050,000/
$1,232,000 Land Value:$623,000
Samshar Management LLC Shiras Ventures LLC
1002 N 31st St,Renton,WA 98056
11803 157th Ave NE,Redmond,WA 98052
Hillmans Lk Wn Garden Of Eden #1 Plat Block:15 Plat Lot:44
334210-1725 Land Use:SFR
09/07/2021 /09/17/2021 Sale Price /Type:$620,000/
$690,000 Land Value:$585,000
Year Built/Eff:
LivingArea:
Lot Area/Acres:
Res/Comm Units:
Bedrooms:
Baths (F /H):
Improvement Value:
Year Built /Eff:
LivingArea:
LotArea /Acres:
Res /Comm Units:
Bedrooms:
Baths (Fl H):
Improvement Value:
Year Built/Eff:
LivingArea:
Lot Area /Acres:
Res /Comm Units:
Bedrooms:
Baths (F!H):
Improvement Value:
Year Built/Eff:
LivingArea:
Lot Area I Acres:
Res /Comm Units:
Bedrooms:
Baths (F /H):
Improvement Value:
Year Built /Eff:
Living Area:
Lot Area /Acres:
Res /Comm Units:
Bedrooms:
Baths (F /H):
Improvement Value:
Year Built/Eff:
LivingArea:
Lot Area /Acres:
Res /Comm Units:
Bedrooms:
Baths (F/H):
Improvement Value:
Year Built /Eff:
Living Area:
Lot Area /Acres:
Res /Comm Units:
Bedrooms:
Baths (F/H):
Improvement Value:
Year Built /Eff:
LivingArea:
Lot Area/Acres:
Res /Comm Units:
Bedrooms:
Baths (Fl H):
Improvement Value:
O 2023 DATATRACEINFORMATIONSERVICESLLCAND/OR ITSAFFILIATES.ALLRIGHTSRESERVED.
2004/
2,720
5,100 I 0.12
1 /
3
2/1
$567,000
2006/
3,290
5,100 /0.12
1 /
3
2/1
$829,000
1992/
3,680
5,100 /0.12
1 /
3
3/2
$807,000
1949/
1,660
7,650 /0.18
1 /
3
1 /1
$339,000
1953/
1,890
6,120/0.14
1/
3
1/0
$163,000
1952/
990
6,630/0.15
1/
2
1/1
$198,000
1992 /
2,200
10,200 /0.23
1 /
4
2/1
$609,000
1970/
1,070
5,100/0.12
1/
4
1/0
$105,000
PAGE5 OF 6
AGENDA ITEM #8. e)
41
42
43
45
OwnerName:
Site Address:
MailingAddress:
Legal Description:
APN:
Salel Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Sale I Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Sale I Rec Date:
Assessed Value:
Owner Name:
Site Address:
MailingAddress:
Legal Description:
APN:
Salel Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Sale I Rec Date:
Assessed Value:
Owner Name:
Site Address:
Mailing Address:
Legal Description:
APN:
Sale I Rec Date:
Assessed Value:
.il...¢£.>._
RAINIERTITLE
Siu,Po Shan
930 N 31st St,Renton,WA 98056
Hillmans Lk Wn Garden Of Eden If 1 Plat Block:15 Plat Lot:45
3342101730 Land Use:SFR
07/19/2020 I 07/29/2022 Sale Price /Type:$800,000 I
$868,000 Land Value:$585,000
Burch,EIlisI Burch,Sharon M
920 N 31st St,Renton,WA 98056
920 N 31st St,Renton,WA 98056
Hillmans Lk Wn Garden Of Eden #1 Plat Block:15 Plat Lot:47
334210-1735 Land Use:SFR
09/16/1989 I 09/19/1989 Sale Price /Type:$75,000/
$846,000 Land Value:$585,000
Hon,Po Yee I Su,Zhi
926 N 31st St,Renton,WA 98056
6809 115th Ct SE,Newcastle,WA 98056
Hillmans Lk Wn Garden Of Eden #1 Plat Block:15 Plat Lot:46
334210-1736 Land Use:SFR
12I19/2016/12/21/2016 Sale Price I Type:$500,000/
$873,000 Land Value:$585,000
Tu &Ngo Family Investment
916 N 31st St,Renton,WA 98056
2016 NE 32nd St,Renton,WA 98056
Hillmans Lk Wn Garden Of Eden If 1 Plat Block:15 Plat Lot:48
334210-1745 Land Use:SFR
07/09/2009 I 07/20/2009 Sale Price I Type:$280,000 I Confirmed
$717,000 Land Value:$585,000
Straight ArrowHomes LLC
910 N 31st St,Renton,WA 98056
910 N 31st St #5,Renton,WA 98056
Hillmans Lk Wn Garden Of Eden #1 Less Rd (Row Dedication Per City Of Ren...
334210-1750 Land Use:SFR
08/31/2021 I 09/01/2021 Sale Price I Type:$600,000/
$585,000 Land Value:$585,000
Sakiyama,Fumio
3100 Burnett Ave N,Renton,WA 98056
3100 Burnett Ave N,Renton,WA 98056
Hillmans Lk Wn Garden Of Eden #1 Flat Block:15 Plat Lot:50
334210-1755 Land Use:SFR
02/20/1995 I 02/22/1995 Sale Price I Type:$157,950I
$909,000 Land Value:$585,000
Year Built I Eff:
LivingArea:
Lot Area I Acres:
Res I Comm Units:
Bedrooms:
Baths (F /H):
Improvement Value:
Year Built I Eff:
Living Area:
Lot Area I Acres:
Res I Comm Units:
Bedrooms:
Baths (F I H):
Improvement Value:
Year Built I Eff:
Living Area:
Lot Area I Acres:
Res I Comm Units:
Bedrooms:
Baths (F I H):
Improvement Value:
Year Built I Eff:
LivingArea:
Lot Area I Acres:
Res I Comm Units:
Bedrooms:
Baths (Fl H):
Improvement Value:
Year Built I Eff:
LivingArea:
Lot Area I Acres:
Res I Comm Units:
Bedrooms:
Baths (F I H):
Improvement Value:
Year Built I Eff:
Living Area:
Lot Area I Acres:
Res I Comm Units:
Bedrooms:
Baths (F I H):
Improvement Value:
0 2023 DATATRACEINFORMATIONSERVICESLLCAND/OR ITSAFFILIATES.ALLRIGHTSRESERVED.
1971/
1,350
5,100/0.12
1/
3
2/0
$283,000
1977/
1,200
5,100/0.12
1/
3
1/0
$261,000
1977 I
1,620
5,100 I 0.12
1 I
4
2/0
$288,000
1971/
1,300
5,100/0.12
1/
4
1/0
$132,000
2023 I
3,490
5,025 I 0.12
5
2/1
1977 I
2,040
5,100 I 0.12
1 I
3
2 I 1
$324,000
PAGE 6 OF 6
AGENDA ITEM #8. e)
OTV DF RENTON
PETITION FOR STREET VACATION
IN THE CITY OF RENTON
To the HonorableMayor and o...Jggg 23,Z 0&1},2.C‘}_§g%§<‘f}
gEgmCEMembersoftheCityCouncil
City of Ramon ctr:-med w=CITYOF BENTONtosss.Grady Way
Renton.WA 93055 Addrx:Egm:El JULl02023
Dear Mayorand Council Members:
Ta :
?fzj-_
TYgLEECl;qEK|I
\éE8FFlCEWe.the undersignedproperty owners abutting a certain portion of public Right-of-Way,£5/'56 (1 fl *4);0‘r'~
respectfullyrequest the vacation of the street or alleyway as described on the attached
"Exhibit A"and
.,,-if «auto’.°:.".:."m?':rm*:’.........i’...f...‘..’3.2’.‘.3’f.£....{“‘f
£f‘§”5»’5ctr.4ve~We request a time and place be fixed when this petition will be heard by the City Council.
Of the property owners abutting the area of this petition 32.%llllaruonveqchedl ofthe
lineal frontage have agreed and indicatedtheir joining this petition with their signatures
below:
W}?rfn;'tt1i;‘:'
‘1 f""’.-—-—Shaomin Huang is the Registered Agent for
V _
Washingtonia Property Management LLC
:1’h§!‘Q1:n Hutu‘!“t~‘‘
L-%9C2kqJ)"ir,i4,:"
'
Mme phonepunt
_.w6
address
3&a£¢)-/65'1"
proputy identiticutionnumber
See attached LLCdocumentation
instructions:
I.insert name of street.(i.e.NE 4th.alleyway curt of Sunset Blvd.)
2.Attach complete legal description(t'.e.mete:and bounds,etc.)
3.Have the applicableproperty owners provide the following:
8)Sign name.(Signatures of owners of 2/3 of lineal frontage mmsign.
Spouses do not need to sign.Owners in common gggsign.)
b)Print name and phone number.
c)List Property addremand King County tax parcelidenti?cationnumber.
4.Attaclumaptothepetitiondcsignatingthevaeationboundaries.
Attachabriefstatententofthepmpoaetobescwedbythestreetvacation.
6.Submi 3350:“?lhtg .with
55¢.»
SUBMlT PETITIONTO THECITY Cl.F.RK.SEVENTH FLOOR.RENTON CITY llAl.l..
V‘.\
AGENDA ITEM #8. e)
Corporations and Charities FilingSystem
Business information
BUSINESSINFORMATION
‘‘‘I WASFTINGTONIAPROPERW MANAGEMENTLU:
Business Type:WA UMITEDLIABILITVCOMPANY
Pfln?ipai Office Street Address:4621 88TH AVE SE.MERCER ISLAND.WA,9349404421,
UNITED STATES
Expiration Dam:06I30I2024
Formationl Registration Date:06/14/2013
inactive Dale:
REGISTEREDAGENTINFORMATION
vs :—:.=redsxsent I-..=rr.I-:1 SHAOMIN HUANG
SW93‘Addiessz 4621 88TH AVE SE.MERCERISLAND.WA.980404421.UNITED
STATES
GOVERNORS
T Governors Type I Entity Name
GOVERNOR INDIVIDUAL
GOVERNOR INDIVIDUAL
UBI Number:604295530
Business Status:ACTIVE
Phncipai Office Maiiing Address:4621 33TH AVE SE.MERCER ISLAND,WA.98040-4421.
UNTTEDSTATES
jurisdiction:UNITEDSTATES.WASHTNGTON
Period of Duration:PERPETUAL
Nature 0.‘Business:PROPERTYMANAGEMENT.REAL ESTATEREAL PROPERTY
|NVESTMENT.ELDERPEOPLE TRYINGTO MAKE SOME
MONEYFOR SURVIVING
MailingAddress:4621 88TH AVESE.MERCERISLAND.WA.98040-4421.UNITED
STATES
FivstName Last Name
SHAOMIN HUANG
MiAN TAN
AGENDA ITEM #8. e)
The undersigned property owners request an ordinance abandoning the ailey right-of-way extending
betweenN31“&N32nStreetsandParkAve Hand BumettAveN
M‘:-‘"1'1pi‘Lr1j,L‘
w"WHw#w'‘-w-_H
/
‘
y I
.._...........—————-—--—-——---—~—--—--—~—--
‘
qvumm ’/sigrmmc
1-»Js~mg*5J -,,’?'(1y_,e‘v?4~*«*»21/("J___.__,_,,,_m __________________-;;,W,punt mm:phone Pm‘him‘W‘
(050 xv-aw’??%"¢'!55?W%,
gjdg-cg:Ilklltx?
3%-~
................................
.4
James McConvi||e is sole owner of parcel ID 334210-1696.King county records includes an af?davit indicating his wife passed away
on December 9 2008.Per that affidavit James is sole owner of said parcel number.See following pages for a copy of the record.
A full reconveyance record from King County records in 2020 shows James Mcconville as the sole trustor.See attached copy.
AGENDA ITEM #8. e)
IETUIWANDRES-S
Ewocu V.M/«limo.Arrouusv AT Law
400 SHATYUCKAvenue Scum
Ramon.WA 98057-2425
?le Mc(‘a«iil:~M'bavn n (‘annually hopmy Annual its Noni!Emu I-I049?{Riv 0!-Rm
[B91100]
~DIANE M.Mc(?ONVl1.LE.Mmas I.
cum;McCO "
»,DIANEM.Mcm:~wu.u=.JAMES J.
LeplDcaicnpuon:ANSLKWNGARDENOFEDENHIW2SF‘TOF39&E35|’-TOF~40
_mbcml:asmoiooooa
STATE or WASl{INGTOW"§_,
couwrvOF KING
James J.Mc(2unvillc.tvcin§‘:’9%ulyswam under oath says:Af?am is the surviving
spans:of Diane M.McConvillc.who?ilatRamon.King County.Washington.on Daccmhcr
9.2008.Nciihct my wife not I had legal proceedings (0 dissolve our marriage
,.w.y
as of the date of my wife‘;death and I was on mhcr 9.2008 and am now legally competent
to slate as lollmvs:
l.The disposition of all community 3;bctwecn Milan!and said deceased
spouse.Diana:M.Mcconvillc,was provided for under SurvivmshipAgtccmcnl dalcd May 20.
I969.recorded May 6.2009.under King C-manlyAuditors Fil:Number 200905000952.
2.‘met:an:no unpaid cmdilors of said decedent or of the formcr manial community not
unpaid funeralexpense and the expenses of last illness have been paid or pnovided for.
AGENDA ITEM #8. e)
3.The total value of all assets in this estate is less than the minimum value,which re-
quircs the ?ling of a Federal Estate Tax mum under Federal law applicable as of thc date of
death.
4.No taxes imposed by the Washington Estate and Transfer Tax Reform Act of I931 are
due.
5.Among other items ofgnfhpiunityproperty was the following real property:
East 35 feet of Lot 40,an
Lakc Washington Garden 0
the plat thexcof rccoxdcdin -
County,Washington.
HallofLot 39.all in Block 15.Hillman‘s
Additionto Seattle No.1,according to
11 of Plats,Pages 63,mcords of King
commonly known as 1030 North 31st Stmct;
Assessed Valuation:Land
Improvements
for the State of Washington.rcsidin .
My appointmentexpires:November 7.2012
AGENDA ITEM #8. e)
Instrument Number:20200729000175 Documcmzl-‘RRec:5121.50 Page!of 1
Record Date:7/29120208:34 AM
Elenronically Recorded King County.WA
WhenRecorqed Mail To:
Trustee Semees.Inc.
P_.0.Box 2980
Sxlverdale,WA 983834980
Whereas meanders’Deedof’l‘mstdescribelownnddoeshereb zppo
isP.0.Box2980,Sl|verdale,WA98383as ocesso
'husteeServ‘.1 .accepts ‘d munen'us 'Tmsteeand nanttothc
request of me?m;no ?M gergsppodoyshereby_reeonve§vwithoutwargattsynothe
persona)emittedthereto.anestate now he!d“by1!under sandDeed of Trust.
Tnmot:JAMES J.MCCONVILLB
Trustee:REGIONALTRUSTEE SERVICES.INC
0n'g1nal'Bene?ci :BOEINGӎMPLOYEBS'CREDITUNION
Da!ed:O7/1512005 Recorded:07f2SI2005 Aud§tor‘si:2005(Y725000089
$3:Rc»Reeorded:Audmor‘s1:
Filed for record in KING State of WASHINGTON
Daiedz(T7127/2020
BOEINGEMPLOYEES’CREDIT UNION
_&___
AGENDA ITEM #8. e)
The undersigned property ownets request an ordinance abandoning the alley right—of~wayextending
bu.-tweenN 31*‘8:N 32:‘:Streets and Park Ave N and Burnett Ave N
&‘L{Ad .,‘M,«.,Prim name phone
A31:-1;“‘\‘\““;2"“""---—-———————11‘(LN ‘aw J’M’L .1211 N 32"“St Renton WA 98055
M
1
Address
'4”Ci ,1 sw ‘>
-
5
-334210-1605
property identi?cation number
AGENDA ITEM #8. e)
The undersigned property owners request an ordinance abandoning the alley right-of-wayextending
between N 31“8-N 32n Streets and Park Ave N and Burnett Ave N
;
r '
«r I’~’-
Signature
W“Marzena K Dominik 106 -eéo ~may
~2M4\.»w"u T.:..u zen669‘N2?pm,mm,pm",
Printnanua phone
1001 N 32"“St Renton WA 98056
00 I '3 ‘arm»mi 9 ca’:
‘am’
Address
3“M,S W
334210-1540
._............_......._:.............._..._..
nrooenvidedi?u?on number property rdentificanon number
AGENDA ITEM #8. e)
If and when the City Council approves the vacation at a public hearing,payment of a post-
hearing processing fee of $250.00 will be required.
signature
print name phone
address
property identi?cation number
signature
prim name
J
pnone print name pnone
M ,‘LaZ §A/Z7 Gt
address address
3%Z /0"_L§Q2 ___:_____?____
.r>_r9r_’e.r£v_i.d:=:It_it‘"2=zti_°_n_I11=.H2*z*=_r_______________________PI9FZ°£Y_‘9E"3‘i‘§‘ia!‘9!‘PEN”?!_____________
;HMM»3 -
signature signature
H >9o7-.DI€-3-U FPHL
print name phone print name phone
Md,_/7EM7/§‘1£2-"’l7£/ti
address address
3 2 4 $1 0 ,4g4;
_rzr9r_><zr£v_i_ds=:1t_if_'1<2=2ti_°:!_r:u_n1*2e_r_____________________-P:9I2ert!.i9912t£?9a3i99swabs:...........--
PRM -Property Services Administration\Administrative\Forms\StreetVacation\StreetVacation Petition.doc
AGENDA ITEM #8. e)
If and when the City Council approves the vacation at a public hearing,payment of a post-
hearing processing fee of $250.00 will be required.
'V D‘g4.._m .
signature signature
K ?c,
print name phone print name phone
@071 45zz,1 ?t’
address address
3?+2/0 ~/v ?y
property identi?cation number property identi?cation number
’lo6~'72.'—/—1:‘/‘3‘i
signature signature
prlnt name pnone print name pnone
address address
.P_r99e_':w_i_d_e9tit'1sa_ti.°:‘_r1u_n3*ze_r_______________________PI‘2E°EY_i£“E‘3‘i*3€"}‘9£‘.“}'EbFE_____________
signature
.
signature
print name phone print name .phone
address address
.P_r9I3e_r£v_i.d9:'£i£'1<_=%1ti_°3*_r1u_n312e:______________________PI<2I2e3*!_i99'1ti?9aIi99_"mb5=E...........-_
PRM -Property Services Administration\Administrative\Forms\StreetVacation\StreetVacation Petition.doc
AGENDA ITEM #8. e)
The undersigned property owners request an ordinance abandoning the alley right-of-way extending
between N 31‘8:N 32:!Streets and Park Ave N and Burnett Ave N
swam";Signature 0,.es
«7?
SUNIL spun PA£IHA§m-m»oH§NU“/‘S ‘N 206 777 H
phone 3Printname Print name 1 phone
HI":N 32:1 5+Pcrhn wit 16056 _1115 N 32"“St Renton WA 98056
Mdma
V
I Address
334215/570 _334210-1590
property number
property identi?cation number
AGENDA ITEM #8. e)
The undersigned property owners request an ordinance abandoning the aiiey right-of-wayextending
between N 31"&N 32n Streets and Park Ave N and Burnett Ave N
Signature Signature
Ciint Mead Clint Mead StZ§_L/é6.6;Z3
prim namg p,i,o,,,¢Print name phone
1013L N 32”’St Renton WA 98056 1013R N 32“St R€nt0n WA 93055
Addfgsg Address
334210-1555 334210-1557
property identificationnumber WOPERV Wmbef
Straight Arrow Homes registered agent is Clint Mead.
Business Information
BUSINBS INFORMATION
Business Name:STRADGHTNIROW HOMES LLC UBJ Number:604 I85 618
Business Type:WA uuntn UABILITVCOMPANY Business Status:ACINE
Prinnpai Offite Street Address:12015 NE 311-!S7 FIE 5.BEILEVUE.Wk.980053141.UNITED Principal Offite Mailing Address:12015 NE 81H SY STE 5.BELLEVUE.WA.980053141.UNITED
SYKIES SYATES
Expiration Date:08/31/2024 Jimsdittion:UNITEDSTATES.WASHINGTON
Formation!Regstration Date:0811412019 Perind at Duration:PERPEYUAL
inactive Date:Nature of Business:CONSTRUCHON
IEGISFERED AGENTINRMIMATION
Registered Agent Name:CUNT MEAD
Street Address:l20‘|5 NE 8TH SI’STE 5.BELLEVUEWA.98M1‘5—3141.UNITED Mailing Address:PO BOX 3946.BELLEVUEWA.swwaus.UNITED STATES
SYATES
AGENDA ITEM #8. e)
u
I
The undersigned property owners request an ordinance abandoning the a?ey right-of—wayextending
between N 31"&N 32n ?at;and Park Ave N and Burnett Ave N
Signature
93 gx /,EEEAJA/4
Print name phone
memy?w
Address 306_,Q73
334210-1645
property identification number
Signature
Pnnt name phone
Address
property identification number
3 33/gr0 /14>6/”
property identi?cation number
Signature
Print name phrmv
Address
property identi?cation number
3.312/0/Q3’7
property identi?cation number
Signature:
Print nnrna phone
Address
property identi?cation number
AGENDA ITEM #8. e)
lfand whenthe?ty Cuumil awmvcsthevacationatspublic heating,paymentofa.post-
hearing processingfee of $250.00 willhe required.
$4...-
334210-1735
...........................................
sigxmutc Egmm
pnmnnm:phone pnm Mme phum.
&“”mm ””'*
....
%’”"‘”“”'"‘“""‘”’”"“""‘“""""‘mm:
pn'mmmc phon:primnnme phunc
address address
idemi?c-M MM ...........-_
HIM ~Pnpeny Sanka A «u&mVm&%m vacuumfdubndar
AGENDA ITEM #8. e)
lfandwhenthecity Councilappmvesthevacaxionmapublic hearing,payment ofaposb
hearing processingfee of $250.00 win he required.
3*“9"‘“"‘/'5204.‘W
Z
7.’‘‘i"6%L%¢1._.__.___._.._____._.__.....__._...._.___..._
mmname N prim name phone
gg,2,.g _§¢.17’%§‘7)
nddmu addnm
334210-1660
.......................-.
sxgmmrc
W m
signnlune
punt name phone print name phone
$7.13"W "ddnns
”W
................................-.
mm“
m..,,..,_.__...s;.;;;;.r:W._....______._“-.W-,.
pnmrwnc phone p7?EfFE”m””'""'"‘”'”-‘Ibo?-C“
mg.-gm S}"mn-u
Identt?anon number ptopcny mu?um numbe»
“*-
-..—.....-..........¢-.u .o u -.-..q ......--.-..-.--u..
AGENDA ITEM #8. e)
PRM25-0071
DEPARTMENT OF COMMUNITY
& ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE:July 17, 2023
TO:Jason Seth, City Clerk
FROM:Amanda Free, Economic Development Assistant Director
SUBJECT:Petition for Street Vacation: Kennydale Alley: lying between
N 31st St & N 32nd St and Park Ave N and Burnett Ave N
Petitioner: Mark Peterson, VAC-23-001
I have received and reviewed the above referenced petition and find it valid.
•More than two-thirds of the abutting property owners have signed the petition.
83% of the frontage is represented by those who have signed the petition.
•The petitioner’s maps and legal description were provided. City staff will provide
maps and legal description to be used for the recording document.
•The petitioner’s explanation of public benefit was provided and will be used in
the public hearing.
Please request the City Council to set a resolution which fixes the time for a public
hearing pursuant to Section 9-14-3 of the RMC.
Finally, please add the following Department File Number to your indexing information:
PRM25-0074.
Thank you.
AGENDA ITEM #8. e)
1
CITY OF RENTON, WASHINGTON RESOLUTION NO. ________ A RESOLUTION OF THE CITY OF RENTON, WASHINGTON SETTING A PUBLIC HEARING DATE REGARDING VACATION OF A PORTION OF THE EAST-WEST RIGHT OF WAY THROUGH BLOCK 15, C.D. HILLMANS LAKE WASHINGTON GARDEN OF EDEN (PETERSON STREET VACATION PETITION VAC-23-001.)
WHEREAS, a petition was filed with the City Clerk on or about June 26, 2023, pursuant to
the requirements of chapter 35.79 RCW and Renton Municipal Code 9-14-2, petitioning for the
vacation of a portion of the east-west right of way through block 15 of C.D. Hillmans Lake
Washington Garden of Eden Division No. 1, as hereinafter more particularly described, and the
petition was signed by the owners of more than two-thirds (2/3) of the property abutting upon
that portion of the right of way sought to be vacated, and same being described in Exhibit A, and
depicted in Exhibit B, attached hereto and made a part hereof as if fully set forth herein.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO
RESOLVE AS FOLLOWS:
SECTION I. That the 11th day of September, 2023, at the hour of 7:00 P.M., is hereby
fixed as the date and time for a public hearing to consider the above-mentioned petition for
vacating the Street; which hearing date is not more than sixty (60) nor less than twenty (20) days
from the date of passage of this resolution.
SECTION II. The City Clerk is hereby authorized and directed to give notice of the time
and date of the public hearing as provided in RMC 9-14-3.A, including instructions on accessing
the hearing via Zoom, if applicable, and/or providing comment, and any and/or all persons
interested therein or objecting to said vacation may then appear and be heard, or they may file
AGENDA ITEM #8. e)
RESOLUTION NO. ________
2
their written objections with the City Clerk at or prior to the time of public hearing on the
vacation.
SECTION III. After the close of the public hearing, the City Council shall determine
whether the vacation of the Street should be granted. If the City Council determines that the
Street should be vacated, the City reserves the right to retain an easement for public utility and
related purposes.
SECTION IV. If the City Council determines that the Street should be vacated, at a future
date to be determined, the City Council shall determine the classification of the Street to be
vacated and, in accordance with the discretion provided in RCW 35.79.030, the amount of
compensation, if any, to be paid by the petitioner-owner(s) to the City for such vacation.
PASSED BY THE CITY COUNCIL this ______ day of _______________________, 2023.
______________________________
Jason A. Seth, City Clerk
APPROVED BY THE MAYOR this ______ day of _______________________, 2021.
______________________________
Armondo Pavone, Mayor
AGENDA ITEM #8. e)
RESOLUTION NO. ________
3
Approved as to form:
______________________________
Shane Moloney, City Attorney
RES:1947:7/31/23
AGENDA ITEM #8. e)
The following described alley to wit:
EXHIBIT "A"
LEGAL DESCRIPTION
An alley right-of-way, having width of 12 feet, running in an east-west direction through block 15, C.D .
Hillman's Lake Washington Garden of Eden Division No . 1, as recorded in Volume 11 of plats, page 63,
records of King County, Washington; and lying westerly of the westerly right-of-way line of Park Avenue
North, extended and easterly of the southerly extension of the west line of Lot 3, Block 15 from the
southwest corner of Lot 3 to the northwest corner of Lot 48, Block 15, of said plat.
As situated within the southwest¼ Section 32, Township 24 N., Range 5 E., W.M .
VACATION AREA
-~ '
------·--·--·· -... _ ... -·--•-• ------• .. --·--;;; iaiotr· -~~·-• -~!!.! ~-~-· · ··--•" • • --·--• • --•--·• -....... ,. --·· ............ j ' ~ .~-~M--~
~ \) i
' -.. ----.. ---·-·· ...... ----........ -·-·· -.... -------.. ---·-.. ------·--.. ----·-·--.... -----·-.. ---------1 t-----
39
-......... _._ .... _._ __ -....... ,•·••··· -.... •·~--·--.... ---;:,~·••·• .... --·-·· -. •·: -·-·· •---..... ------. --------.. -........... -.. •·• -.. --------.. +--·-.... -----·-·-.. -.. -______ ·: --.. .
AGENDA ITEM #8. e)
AGENDA ITEM #8. e)
AB - 3403
City Council Regular Meeting - 07 Aug 2023
SUBJECT/TITLE: Bid Award-Downtown Core Streetscape Phase 2 – Williams Avenue
South Construction Contract CAG-23-241
RECOMMENDED ACTION: Refer to Finance Committee
DEPARTMENT: Community & Economic Development Department
STAFF CONTACT: Michael Sippo, Civil Engineer III
EXT.: 7298
FISCAL IMPACT SUMMARY:
The submitted low bid of $1,109,109 is under the engineer’s estimate of $1,244,916 by $135,807.
The estimated total project cost is $1,448,981, including services during design and bidding, construction
contract, services during construction, contingencies, business/property owner outreach, and contract
administration. As of July 31, 2023, $99,034 of the total project cost h ad been incurred, with $1,349,947
outstanding.
The previously authorized budget for the project is $833,551 (account nos. 316.060199.007.594.58.63.005 –
CDBG and 316.060199.007.594.58.63.006 - General Fund). As of July 31, 2023, the balance of the previously
authorized budget is $734,517.
Council’s authorization is requested for an additional budget appropriation in the amount of $664,646 offset
by additional grant revenues of the same amount, which when coupled with the previously authorized budget,
will cover the outstanding project costs including the construction contract. The additional grant revenues will
be provided by Community Development Block Grant (CDBG) federal funds that were approved by City Council
(“Council”) and earmarked to be expended on the streetscape project in previous years (2021 and 2022), but
only recently received through an agreement with King County on July 28, 2023.
The King County CDBG agreement and acceptance of the 2022 and 2023 CDBG funds ($664,646) is the subject
of AB-3398 which is being considered concurrently with this item.
The additional budget appropriation of $664,646 will be included in the 2023 mid -bi budget adjustment.
SUMMARY OF ACTION:
The City Clerk Division reports that bids for this construction contract were received on Thursday, July 20,
2023, and opened on Monday, July 24, 2023. A total of five (5) bids were submitted and bid amounts are
summarized below.
Bid Submitted by Bid Amount
Active Construction $1,109,109
Northwest Cascade $1,205,205
RW Scott Construction $1,255,036
Titan Earthwork $1,263,999
AGENDA ITEM #8. f)
Westwater Construction $1,556,180
The project, Downtown Core Streetscape Phase 2 – Williams Avenue South Construction Contract CAG-23-241,
consists of the installation of new streetscape along the 200 block of Williams Avenue South (between South
2nd and 3rd streets), including new sidewalks, streetlights, street trees, fenced landscaped areas, litter
receptacles, and repaving of the street and parking areas.
Per City Policy 250-02, the bid award must be referred to the appropriate city council committee for review
and action if one or more of these criteria are not met:
1. There was more than one bid,
2. The lowest responsive and responsible bid was within the project budget, and
3. The lowest responsive and responsible bid contained no significant irregularities
Since the second criteria has not been met, staff requests that t his item be referred to the Finance Committee
for authorization of additional funding and for recommendation of award of the construction contract.
Determination of Responsive Bid and Responsible Bidder
The Development Engineering staff have reviewed th e submitted bid and determined that the bid is
responsive and that Active Construction is a responsible bidder as defined in RCW 39.04.350, in Renton City
policy 250-02, and in section 1-02.14 of the project specifications (see Exhibit B – Bidder Assessment – Active
Construction). The surety company has confirmed that the bid bond submitted by Active Construction is valid.
Active Construction has successfully completed multiple public works projects with the City, including federally
funded projects, and has been determined to have the required experience and expertise to perform the
project. Attached are the engineer’s bid tabulation and the completed bid assessment form.
Budget Adjustment Request
The previously authorized project budget is $833,551 ($396,551 from account 316.060199.007.594.58.63.005
– CDBG and $437,000 from account 316.060199.007.594.58.63.006 - General Fund). The estimated total
project cost is $1,448,981 with the following breakd own:
Bid from Active Construction $1,109,109
Professional services during design and bidding $122,014
Professional services during construction $51,770
Contract administration including inspections and
business/property owner outreach $50,000
Contingencies $116,088
Total project cost $1,448,981
Previously approved budget $833,551
Additional budget appropriation of CDBG funds for
subject project $664,646
The CED Development Engineering Division requests an additional budget appropriation o f $664,646 in 2022
and 2023 CDBG funds to cover the balance of the outstanding project costs, including the construction
contract. The additional budget appropriation of $664,646 in CDBG funds will be included in the 2023 mid -bi
budget adjustment.
EXHIBITS:
A. Staff Recommendation Memo
B. Bid Tabulation
C. Final Bid Assessment
AGENDA ITEM #8. f)
D. Recommendation of Award Letter – Active Construction
E. City Clerk Bid Tab
STAFF RECOMMENDATION:
Award the construction contract for the Downtown Core Streetscape Phase 2 – Williams Avenue South Project
CAG-23-241 to the lowest responsive and responsible bidder, Active Construction, in the amount of
$1,109,109.
Additionally, authorize an additional budget appropriation in the amount of $664,646 offset by additional
CDBG revenues of the same amount, which when coupled with the previously authorized budget, will cover
the outstanding project costs including the construction contract. The additional bud get appropriation of
$664,646 will be included in the 2023 mid-bi budget adjustment.
AGENDA ITEM #8. f)
DEPARTMENT OF COMMUNITY
& ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: August 1, 2023
TO: Jason Seth, City Clerk
FROM: Vanessa Dolbee, Interim CED Administrator, x7314
STAFF CONTACT: Brianne Bannwarth, Development Engineering Director,
x7299
SUBJECT: Bid Award-Downtown Core Streetscape Phase 2 – Williams
Avenue South Construction Contract CAG-23-241
The Community and Economic Development Department’s Development Engineering Division
has reviewed the bids submitted for the Downtown Core Streetscapes Phase 2 – Williams
Avenue South Project and recommends that contract CAG-23-241 be awarded to the lowest
responsive and responsible bidder, Active Construction, in the amount of $1,109,109. We
request that an agenda bill for Council referral to Finance Committee be prepared for the
August 7, 2023 Council meeting.
The bid opening was held on July 24, 2023. Five (5) bids were submitted for the project and are
summarized below in ascending order:
Bid Submitted by Bid Amount
Active Construction $1,109,109
Northwest Cascade $1,205,205
RW Scott Construction $1,255,036
Titan Earthwork $1,263,999
Westwater Construction $1,556,180
Per City Policy 250-02, the bid award must be referred to the appropriate city council
committee for review and action if one or more of these criteria are not met:
1. There was more than one bid,
2. The lowest responsive and responsible bid was within project budget, and
3. The lowest responsive and responsible bid contained no significant irregularities.
Since the second criteria has not been met, staff requests that this item be referred to the
Finance Committee for authorization of additional funding and for recommendation of award
of the construction contract.
AGENDA ITEM #8. f)
City Clerk
Page 2 of 3
August 1, 2023
The bid submitted by Active Construction was under the engineer’s estimate of $1,244,916 by
$135,807. After analysis of the bids based on the criteria established in the bid documents and
specifications, we determined that the bid submitted by Active Construction to be a
responsible, non-irregular bid, and a fair representation of the cost of the work associated with
this project. The surety company has confirmed that that the bid bond submitted by Active
Construction is valid. Active Construction has completed similar work for the City of Renton.
Enclosed is the engineer’s bid tabulation and the completed bid assessment form.
The previously authorized project budget is $833,551 ($396,551 from account
316.060199.007.594.58.63.005 – CDBG and $437,000 from account
316.060199.007.594.58.63.006 - General Fund). The estimated total project cost is $1,448,981
with the following breakdown:
Bid from Active Construction $1,109,109
Professional services during design and bidding $122,014
Professional services during construction $51,770
Contract administration including inspections and business/property owner outreach $50,000
Contingencies $116,088
Total project cost $1,448,981
Previously approved budget $833,551
Additional budget appropriation of CDBG funds for subject project $664,646
The CED Development Engineering Division requests an appropriation in the amount of
$664,646 offset by additional grant revenues of the same amount, which when coupled with
the previously authorized budget, will cover the outstanding project costs including the
construction contract. The additional grant revenues will be provided by Community
Development Block Grant (CDBG) federal funds that were approved by City Council and
earmarked to be expended on the streetscape project in previous years (2021 and 2022), but
only recently received through an agreement with King County on July 28, 2023.
The additional budget appropriation of $664,646 in CDBG funds will be included in the 2023
mid-bi budget adjustment.
Please note that the King County CDBG agreement and acceptance of the 2022 and 2023 CDBG
funds ($664,646) is the subject of AB-3398 which should be considered concurrently with this
item.
The project will continue the City’s efforts to implement the Downtown Civic Core Vision and
Action Plan and related city initiatives by upgrading the downtown environment with accessible
and attractive streetscapes. Streetscape improvements facilitate city maintenance efforts,
reduce long term costs through use of durable materials, promote pedestrian safety and
comfort, enhance economic activity, provide businesses with better storefront settings, and
enhance livability and usability for downtown and surrounding neighborhood residents. The
AGENDA ITEM #8. f)
City Clerk
Page 3 of 3
August 1, 2023
initial phase of improvements was completed in 2021 on the 200 block of Wells Avenue South
(one block east).
The subject project consists of the installation of new streetscape along the 200 block of
Williams Avenue South (between South 2nd and 3rd streets), including new sidewalks,
streetlights, street trees, fenced landscaped areas, litter receptacles, and repaving of the street
and parking areas between South 2nd and South 3rd streets. The project construction contract
document allows for 40 working days to complete construction.
Attachments: 1a. Bid Tabulation
1b. Final Bid Assessment_Active Construction_8-1-23
1c. City Clerk Bid Tab
1.d. Recommendation of Award Letter – Active Construction, dated 7-27-2023 by
KPG Psomas
cc: Michael Sippo, Civil Engineer III
John Collum, Redevelopment Manager
AGENDA ITEM #8. f)
Project: Downtown Core Streetscape Phase 2 - Williams Ave S
CAG-23-241 Engineers Estimate
Bid Date: July 20, 2023 @ 1:00 pm
Item Unit Est. Unit Bid Unit Bid Unit Bid Unit Bid Unit Bid Unit Bid
No.Quantity Price Amount Price Amount Price Amount Price Amount Price Amount Price Amount
1 Minor Change EST 1 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00
2 Roadway Surveying LS 1 15,700.00 15,700.00 10,000.00 10,000.00 10,000.00 10,000.00 11,550.00 11,550.00 9,900.00 9,900.00 11,000.00 11,000.00
3 Record Drawings LS 1 800.00 800.00 800.00 800.00 2,500.00 2,500.00 1,000.00 1,000.00 125.00 125.00 1,500.00 1,500.00
4 SPCC Plan LS 1 600.00 600.00 500.00 500.00 1,000.00 1,000.00 500.00 500.00 125.00 125.00 1,000.00 1,000.00
5 Mobilization LS 1 85,000.00 85,000.00 125,500.00 125,500.00 150,000.00 150,000.00 116,000.00 116,000.00 87,206.00 87,206.00 100,000.00 100,000.00
6 Project Temporary Traffic Control LS 1 91,000.00 91,000.00 105,725.00 105,725.00 180,000.00 180,000.00 12,500.00 12,500.00 73,000.00 73,000.00 80,000.00 80,000.00
7 Relocate Street Tree EA 6 1,500.00 9,000.00 1,100.00 6,600.00 5,000.00 30,000.00 500.00 3,000.00 2,800.00 16,800.00 3,200.00 19,200.00
8 Removal of Structures and Obstructions LS 1 9,000.00 9,000.00 7,200.00 7,200.00 30,000.00 30,000.00 71,140.00 71,140.00 15,000.00 15,000.00 54,000.00 54,000.00
9 Asphalt Conc. Pavement Removal SY 930 18.00 16,740.00 23.00 21,390.00 75.00 69,750.00 9.00 8,370.00 22.00 20,460.00 30.00 27,900.00
10 Cement Conc. Sidewalk Removal SY 910 15.00 13,650.00 13.00 11,830.00 112.00 101,920.00 18.00 16,380.00 17.00 15,470.00 35.00 31,850.00
11 Curb Removal LF 840 12.00 10,080.00 5.00 4,200.00 20.00 16,800.00 8.00 6,720.00 8.00 6,720.00 28.00 23,520.00
12 Crushed Surfacing Base Course TON 550 54.00 29,700.00 59.00 32,450.00 100.00 55,000.00 50.00 27,500.00 53.00 29,150.00 65.00 35,750.00
13 HMA Cl. 1/2" PG 58-H-22 TON 470 175.00 82,250.00 187.50 88,125.00 250.00 117,500.00 152.50 71,675.00 150.00 70,500.00 160.00 75,200.00
14 Planing Bituminious Pavement SY 1,660 10.00 16,600.00 9.00 14,940.00 15.00 24,900.00 6.00 9,960.00 12.00 19,920.00 4.00 6,640.00
15 Downspout and Roof Drains LS 1 11,000.00 11,000.00 40,000.00 40,000.00 35,000.00 35,000.00 11,250.00 11,250.00 9,700.00 9,700.00 14,000.00 14,000.00
16 Furnish and Install New Frame and Grate, Adjust to Grade EA 3 1,000.00 3,000.00 900.00 2,700.00 2,000.00 6,000.00 1,025.00 3,075.00 1,350.00 4,050.00 1,500.00 4,500.00
17 Connection to Drainage Structure EA 3 2,500.00 7,500.00 780.00 2,340.00 500.00 1,500.00 700.00 2,100.00 1,000.00 3,000.00 1,200.00 3,600.00
18 Storm System Cleanout EA 4 600.00 2,400.00 400.00 1,600.00 1,500.00 6,000.00 825.00 3,300.00 464.00 1,856.00 500.00 2,000.00
19 Adjust Cleanout to Grade EA 3 500.00 1,500.00 200.00 600.00 500.00 1,500.00 600.00 1,800.00 500.00 1,500.00 700.00 2,100.00
20 Adjust Water Valve Box to Grade EA 8 550.00 4,400.00 275.00 2,200.00 1,500.00 12,000.00 600.00 4,800.00 465.00 3,720.00 500.00 4,000.00
21 Adjust Sewer Manhole to Grade EA 1 800.00 800.00 675.00 675.00 500.00 500.00 600.00 600.00 725.00 725.00 1,500.00 1,500.00
22 Adjust Storm Drainage Structure to Grade EA 6 800.00 4,800.00 385.00 2,310.00 1,000.00 6,000.00 600.00 3,600.00 538.00 3,228.00 900.00 5,400.00
23 Adjust Area Drain to Grade EA 1 500.00 500.00 175.00 175.00 500.00 500.00 600.00 600.00 480.00 480.00 1,000.00 1,000.00
24 Adjust Monitoring Well to Grade EA 2 600.00 1,200.00 475.00 950.00 500.00 1,000.00 600.00 1,200.00 480.00 960.00 1,500.00 3,000.00
25 Furnish and Install New Water Meter Box EA 8 1,000.00 8,000.00 1,295.00 10,360.00 1,500.00 12,000.00 825.00 6,600.00 380.00 3,040.00 600.00 4,800.00
26 Erosion Control and Water Pollution Prevention LS 1 9,000.00 9,000.00 7,500.00 7,500.00 2,000.00 2,000.00 24,800.00 24,800.00 4,200.00 4,200.00 2,500.00 2,500.00
27 Topsoil Type A CY 62 80.00 4,960.00 80.00 4,960.00 100.00 6,200.00 89.00 5,518.00 89.00 5,518.00 75.00 4,650.00
28 Bark or Wood Chip Mulch CY 2 100.00 200.00 190.00 380.00 250.00 500.00 139.00 278.00 140.00 280.00 64.00 128.00
29 PS Nyssa Sylvatica 'David Odom' / Afterburner Tupelo; 2.5" cal., 12'-14' ht. EA 4 700.00 2,800.00 857.00 3,428.00 1,000.00 4,000.00 725.00 2,900.00 725.00 2,900.00 760.00 3,040.00
30 PS Parrotia persica 'Vanessa'/ Vanessa Persian Ironwood; 2.5" cal., 12'-14' ht. EA 7 700.00 4,900.00 857.00 5,999.00 1,000.00 7,000.00 725.00 5,075.00 725.00 5,075.00 215.00 1,505.00
31 PS Quercus x Bimundorum 'JFS-KW2QX'/ JFS-KW2QX Skinny Genes Oak; 2.5" cal., 12'-14' ht.EA 3 700.00 2,100.00 857.00 2,571.00 1,000.00 3,000.00 725.00 2,175.00 725.00 2,175.00 760.00 2,280.00
32 PS Sesleria autumnalis/ Autumn Moor Grass; 1 Gal. Cont.EA 24 22.00 528.00 29.00 696.00 50.00 1,200.00 22.00 528.00 22.00 528.00 31.00 744.00
33 PS Bouteloua gracilis 'Blonde Ambition'/ Blonde Ambition Blue Gramma Grass; 1 Gal. Cont. EA 39 22.00 858.00 23.00 897.00 50.00 1,950.00 22.00 858.00 22.00 858.00 31.00 1,209.00
34 Root Barrier LF 390 20.00 7,800.00 21.00 8,190.00 25.00 9,750.00 17.00 6,630.00 17.00 6,630.00 24.00 9,360.00
35 Plant Establishment - 1 Year LS 1 5,000.00 5,000.00 4,000.00 4,000.00 5,000.00 5,000.00 4,450.00 4,450.00 4,475.00 4,475.00 10,000.00 10,000.00
36 Irrigation System LS 1 25,000.00 25,000.00 45,000.00 45,000.00 40,000.00 40,000.00 28,600.00 28,600.00 21,650.00 21,650.00 50,000.00 50,000.00
37 Cement Conc. Traffic Curb and Gutter LF 830 40.00 33,200.00 39.00 32,370.00 65.00 53,950.00 50.50 41,915.00 53.00 43,990.00 35.00 29,050.00
38 Cement Conc. Driveway Entrance SY 130 180.00 23,400.00 210.00 27,300.00 200.00 26,000.00 193.00 25,090.00 221.00 28,730.00 175.00 22,750.00
39 Cement Conc. Sidewalk SY 760 100.00 76,000.00 164.00 124,640.00 165.00 125,400.00 129.00 98,040.00 127.00 96,520.00 141.00 107,160.00
40 Cement Conc. Curb Cut Access EA 1 2,500.00 2,500.00 3,750.00 3,750.00 1,000.00 1,000.00 2,350.00 2,350.00 1,675.00 1,675.00 8,000.00 8,000.00
41 Illumination System Along Williams Avenue, Complete LS 1 461,000.00 461,000.00 364,875.00 364,875.00 200,000.00 200,000.00 351,000.00 351,000.00 311,000.00 311,000.00 290,400.00 290,400.00
42 Spare Conduit System, Complete LS 1 39,000.00 39,000.00 34,818.00 34,818.00 75,000.00 75,000.00 45,544.00 45,544.00 27,000.00 27,000.00 50,000.00 50,000.00
43 Permanent Signing LS 1 8,400.00 8,400.00 2,650.00 2,650.00 6,500.00 6,500.00 4,450.00 4,450.00 3,750.00 3,750.00 5,000.00 5,000.00
44 Paint Line LF 980 5.00 4,900.00 2.00 1,960.00 2.00 1,960.00 1.60 1,568.00 1.75 1,715.00 2.00 1,960.00
45 Plastic Line LF 160 10.00 1,600.00 7.00 1,120.00 10.00 1,600.00 7.25 1,160.00 7.00 1,120.00 8.00 1,280.00
46 Plastic Access Parking Space Symbol EA 1 750.00 750.00 375.00 375.00 1,000.00 1,000.00 404.00 404.00 385.00 385.00 400.00 400.00
47 Tree Grate EA 10 3,500.00 35,000.00 4,200.00 42,000.00 3,500.00 35,000.00 7,900.00 79,000.00 7,150.00 71,500.00 6,700.00 67,000.00
48 Waste Receptacle EA 2 2,200.00 4,400.00 1,275.00 2,550.00 3,000.00 6,000.00 2,150.00 4,300.00 2,200.00 4,400.00 2,500.00 5,000.00
49 Landscape Strip Fencing LF 88 300.00 26,400.00 100.00 8,800.00 350.00 30,800.00 379.00 33,352.00 300.00 26,400.00 320.00 28,160.00
50 Resolution of Utility Conflicts EST 1 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00
1,244,916.00 1,263,999.00 1,556,180.00 1,205,205.00 1,109,109.00 1,255,036.00
$1,244,916.00 $1,263,999.00 Total $1,556,180.00 Total $1,205,205.00 Total $1,109,109.00 Total $1,255,036.00
By:
Michael Sippo, Project Manager
Red Numbers = Corrected Numbers
Titan Earthwork Westwater Construction RW Scott Construction
Description
Subtotal
10.1% Sale Tax
Total
Northwest Cascade Active Construction
Bid Tab Page 1
Michael Sippo 8/1/23 AGENDA ITEM #8. f)
Bidder:ACTIVE CONSTRUCTION INC.
0
WA UBI No.:273001533
License No.: ACTIVCI164JL
Entity Type:Corporation
Item Description Determination
1. A Proposal will be considered irregular and will be rejected if:
Criteria Met
(Per Below)
1.a. The bidder is not prequalified when so required;N/A
1.b. The authorized proposal form furnished by the Contracting Agency is not used or is altered;No
1.c. The complete proposal form contains any unauthorized additions, deletions, alternate bids, or conditions;No
1.d. The bidder adds provisions reserving the right to reject or accept the award, or enter into the Contract;No
1.e. A price per unit cannot be determined from the bid proposal;No
1.f. The proposal form is not properly executed;No
1.g. The Bidder fails to submit or properly complete a Subcontractor list, if applicable, as required in Section 1-02.6;No
1.h The Bidder fails to submit or properly complete a Disadvantaged Business Enterprise Certification (WSDOT Form 271-015), if
applicable, as required in Section 1-02.6;N/A
1.i
The Bidder fails to submit Written Confirmations (WSDOT Form 422-031) from each DBE firm listed on the Bidder's
complete DBE Uitlization Certification that they are in agreement with the bidder's DBE particiaption commitment, if
applicalbe, as required in Section 1-02.6, or if the written confirmation that is submitted fails to meet the requirements of
the Special Provisions;
N/A
1.j The Bidder fails to submit DBE Good Faith Effort documentation, if applicable, as required in section 1-02.6, or if the
documentation that is submitted fails to demonstrate that a Good Faith Effort to meet the Condition of Award was made;N/A
1.k The Bidder fails to submit a DBE Bid Item Breakdown (WSDOT Form 272-054), if applicable as required in Section 1-02.6, or
if the documentation that is submitted fails to meet the requirements of the Special Provisions;N/A
1.h.The Bidder fails to submit DBE Trucking Credit Forms (WSDOT Form 272-058), if applicable, as required in Section 1-02.6, or
if the documentation that is submitted fails to meet the requirements of the Special Provisions;N/A
1.m. The bid proposal does not constitute a definite and unqualified offer to meet the material terms of the bid invitation.No
1.n. More than one proposal is submitted for the same project from a Bidder under the same or different names.No
Item Description Determination
2. A Proposal may be considered irregular and may be rejected if:
Criteria Met
(Per Below)
2.a. The Proposal does not include a unit price for every Bid item.No
2.b.Any of the unit prices are excessively unbalanced (either above or below the amount of a reasonable Bid) to the potential
detriment of the Contracting Agency;No
2.c. Receipt of Addenda is not acknowledged;No
2.d.A member of a joint venture or partnership and the joint venture or partnership submit Proposals for the same project (in
such an instance, both Bids may be rejected); or No
2.e. If the Proposal form entried are not made in ink.No
Item Description Determination
0
A Bidder will be deemed not responsible and the proposal rejected if the bidder does not meet the responsibility criteria in
RCW 39.04.350(1), as amended; or does not meet Supplemental Criteria 1-7 listed in this Section. The Contracting Agency
will verify that the Bidder meets the mandatory bidder responsibility criteria in RCW 39.04.350(1), and Supplmental Cirteria
1-2. Evidence that the Bidder meets Supplmental Criteria 3-7 shall be provided by the Bidder as stated later in this Section.
Criteria Met
(Per Below)
Bidder Assessment
CAG-23-241
Bid Opening
Downtown Core Streetscape Phase 2 – Williams Avenue South
City Special Provisions 1-02.13 Irregular Proposals (December 30, 2022 APWA GSP)
City Special Provisions 1-02.14 Disqualification of Bidder (May 17, 2018 APWA GSP, Option B)
City Special Provisions 1-02.13 Irregular Proposals (December 30, 2022 APWA GSP)
07/24/2023
Bidder Assessment-West Hill BPS Improvements Project Page 1 of 4
AGENDA ITEM #8. f)
1 Delinquent State Taxes:
Criteria Met
(Per Below)
1.a.Criterion: The Bidder shall not owe delinquent taxes to the Washington State Department of Revenue without a payment
plan approved by the Depeeartment of Revenue.No
1.b.
Documentation: The Bidder, if and when required as detailed below, shall sign a statement (on a from to be provided by
the Contracting Agency) that the Bidder does not owe delinquent taxes to the Washington State Department of Revenue, or
if delinquent taxes are owned to the Washington State Department of Revenue, the Bidder must submit a written payment
plan approved by the Department of Revenue, to the Contracting Agency by the deadline listed below.
No
2 Federal Debarment
2.a. Criterion: The Bidder shall not currently be debarred or suspended by the Federal government. No
2.b.Documentation: The Bidder shall not be listed as having an "active exclusion" on the U.S. government's "System for Award
Management" database (www.sam.gov).No
3 Subcontractor Responsibility
3.a.
Criterion: The Bidder's standard subcontract form shall include the subcontractor responsibility language required by RCW
39.06.020, and the Bidder shall have an established procedure which it utilizes to validate the responsibility of each of its
subcontractors. The Bidder's subcontract form shall also include a requirement that each of its subcontractors shall have
and document a similar procedure to determine whether the sub-tier subcontractors with whom it contracts are also
"responsible" subcontractors as defined by RCW 39.06.020.
Included in response to
City RFI dated 7/31/23.
Response provided
7/31/23
3.b.
Documentation: The Bidder, if an when required as detailed below, shall submit a copy of its standard subcontract form for
review by the Contracting Agency, and a written description of its procedure for validating the responsibility of
subcontractors with which it contracts.
Included in response to
City RFI dated 7/31/23.
Response provided
7/31/23
4 Claims Against Retainage and Bonds
4.a.
Criterion: The Bidder shall not have a record of excessive claims filed against the retainage or payment bonds for public
works projects in the three years prior to the bid submittal date, that demonstrate a lack of effetive management by the
Bidder of making timely and appropriate payments to its subcontractors, suppliers, and workers, unless there are
exenuating circumstances and such circumstances are deemed acceptable to the Conracting Agency.
No claims. Included by
response to City RFI dated
7/31/23. Response
provided 7/31/23
4.b.
Documentation: The Bidder, if and when required as detailed below, shall submit a list of the public works projects
completed in the three years prior to the bid submittal date that have had claims against retainage and bonds and include
for each project the following information: Name of project; The owner and contact information for the owner; A list of
claims filed against the retainage and/or payment bond for any of the projects listed; A written explanation of the
circumstances surrounding each claim and the ultimate resolution of the claim.
No Claims. Included in
response to City RFI dated
7/31/23. Response
provided 7/31/23
5 Public Bidding Crime
5.a.Criterion: The Bidder and/or its owners shall not have been convicted of a crime involving bidding on a public works
contract in the five years prior to the bid submittal date.
No. Signed form included
in response to City RFI
dated 7/31/23. Response
provided 7/31/23
5.b.
Documentation: The Bidder, if and when required as detailed below, shall sign a statement (on a form to be provided by
the Contracing Agency) that the Bidder and/or its owners have not been convicted of a crime involving bidding on a public
works contract.
No. Signed form included
in response to City RFI
dated 7/31/23. Response
provided 7/31/23
6 Termination for Cause/Termination for Default
6.a.
Criterion: The Bidder shall not have had any public works contract terminated for cause or terminated for default by a
government agency in the five years prior to the bid submittal date, unless there are extenuating circumstances and such
circumstances are deemed acceptable to the Contracting Agency.
No. Signed form included
in response to City RFI
dated 7/31/23. Response
provided 7/31/23
6.b.
Documentaiton: The Bidder, if and when required as detailed below, shall sign a statement (on a form to be provided by
the Contracting Agency) that the Bidder has not had any public works contract terminated for cause or terminated for
default by a government agency in the five years prior to the bid submittal date; or if Bidder was terminated, describe the
circumstances.
No. Signed form included
in response to City RFI
dated 7/31/23. Response
provided 7/31/23
7 Lawsuits
7.a.
Criterion: The Bidder shall not have lawsuits with judgments entered against the Bidder in the fie years prior to the bid
submittal date that demonstrate a pattern of failing to meet the terms of contracts, unless there are extenuating
circumstances and such circumstances are deemed acceptable to the Contracting Agency.
No. Signed form included
in response to City RFI
dated 7/31/23. Response
provided 7/31/23
Bidder Assessment-West Hill BPS Improvements Project Page 2 of 4
AGENDA ITEM #8. f)
7.b.
Documentation: The Bidder, if and when required as detailed below, shall sign a statement (on a form to be provided by
the Contracting Agency) that the Bidder has not had any lawsuits with judgments entered against the Bidder in the five
years prior to the bid submittal date that demonstrate a pattern of failing to meet the terms of contracts, or shall submit a
list of all lawsuits with judgments entered against the Bidder in the five years prior to the bid submittal date, along with a
written explanation of the circumstances surrounding each such lawsuit. The Contracting Agency shall evaluate these
explanations to determine whether the lawsuits demonstrate a pattern of failing to meet of terms of construction related
contracts.
No. Signed form included
in response to City RFI
dated 7/31/23. Response
provided 7/31/23
Item Description Determination
(1)Before award of a public works contract, a bidder must meet the following responsibility criteria to be considered a
responsible bidder and qualified to be awarded a public works project. The bidder must:
Criteria Met
(Per Below)
Yes
0
0
(1)(b) Have a current state unified business identifier number;Yes
(1)(c)If applicable, have industrial insurance coverage for the bidder's employees working in Washington as required in
Title 51 RCW;Yes
(1)(d) Not be disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3);Not disqualified
(1)(e)
If bidding on a public works project subject to the apprenticeship utilization requirements in RCW 39.04.320, not have been
found out of compliance by the Washington state apprenticeship and training council for working apprentices out of ratio,
without appropriate supervision, or outside their approved work processes as outlined in their standards of apprenticeship
under chapter 49.04 RCW for the one-year period immediately preceding the date of the bid solicitation;
Not found out of
compliance
(1)(f)
Have received training on the requirements related to public works and prevailing wage under this chapter and
chapter 39.12 RCW. The bidder must designate a person or persons to be trained on these requirements. The training must
be provided by the department of labor and industries or by a training provider whose curriculum is approved by the
department. The department, in consultation with the prevailing wage advisory committee, must determine the length of
the training. Bidders that have completed three or more public works projects and have had a valid business license in
Washington for three or more years are exempt from this subsection. The department of labor and industries must keep
records of entities that have satisfied the training requirement or are exempt and make the records available on its web
site. Responsible parties may rely on the records made available by the department regarding satisfaction of the training
requirement or exemption; and
Satisfied
(1)(g)
Within the three-year period immediately preceding the date of the bid solicitation, not have been determined by a final
and binding citation and notice of assessment issued by the department of labor and industries or through a civil judgment
entered by a court of limited or general jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of
chapter 49.46, 49.48, or 49.52 RCW.
Satisfied
(1)(a) At the time of bid submittal, have a certificate of registration in compliance with chapter 18.27 RCW;
RCW 39.04.350 Bidder Responsibility Criteria
Bidder Assessment-West Hill BPS Improvements Project Page 3 of 4
AGENDA ITEM #8. f)
Bid Bond Verification:
Active Construction – Propel Insurance 253-759-2200 Yes, 7/28/23 Carlee Esperito
Northwest Cascade – Fidelity Insurance Yes serviced through Propel Yes, Carlee Esperito 7/28/23
RW Scott – Fidelity Insuance Yes serviced through Propel Yes, Carlee Esperito 7/28/23
Titan Earthwork – Propel Insurance Yes serviced through Propel Yes, Carlee Esperito 7/28/23
Westwater – Merchants Bonding Co
· Phone Conversation with Carlee Esperito on 7/28/23 determined that 4 bid bonds were serviced
through Propel Insurance or subsidiaries
AGENDA ITEM #8. f)
KPG
July 27,2023
City of Renton
Michael Sippo
1055 S Grady Way
Renton,WA 98057
RE:Downtown Core Streetscape Phase 2 Project
Dear Michael Sippo,
As requested,KPG has completed the verification for Active Construction,Inc.for the Downtown Core Streetscape
Phase 2 project.
We have checked the status of Active Construction,Inc.on the Washington State Labor and Industries web page to
confirm they are currently insured,bonded,and licensed.Additionally,no strikes or debarment records arose
federally or statewide regarding Active Construction,Inc.Subcontractors noted in their bid documents have also
been verified and are compliant.
It is KPG’s recommendation that the Downtown Core Streetscape Phase 2 project be awarded to Active
Construction,Inc.
We have enclosed the contractor verification package for your review
Respectfully,
Cassie Kendall
Senior Documentation Specialist
KPG Psomas
Cc:John Collum,Oliva Paraschiv,Justin Wu,Jake Williams
AGENDA ITEM #8. f)
CITYOF RENTON
BID TABULATION SHEET
Project:Downtown Core Streetscape Phase 2 -Williams Av S -CAG-23-241
Due Date:July 20,2023 at 1:00 p.m.
Opening Date:July 24,2023 at 1:00 p.m.
Bid Total from
Bidder Proposal Federal Cert of Non—Co||Sub Recycled Sig Bid Adden Schedule of Prices
Cover Proposal aird Comp Aff List Materials Page Bond Ack *|ncludes Sales Tax
Active Construction,Inc.
P.O.Box 430
Puyallup $1,109,109.00
WA
98371 .
Northwest Cascade,Inc.
P.O.Box 73399
Puyallup $1,205,205.00
WA
98373
R.W.Scott Construction,Co.
4006 West Valley Highway,Suite A
1,206.436.00
Engineer's Estimate:$1,244,916.00AGENDA ITEM #8. f)
CITYOF RENTON
BID TABULATION SHEET
Project:Downtown Core Streetscape Phase 2 -Williams Av S -CAG-23-241
Due Date:July 20,2023 at 1:00 p.m.
Opening Date:July 24,2023 at 1:00 p.m.
Bid Total from
Bidder Proposal Federal Cert of Non—Co||Sub Recycled Sig Bid Adden Schedule of Prices
Cover Proposal aird Comp Aff List Materials Page Bond Ack *lncludes Sales Tax
Titan Earthwork
1585 Valentine Av SE
Pacific $1,263,999.00
WA
98047
Westwater Construction Company
P.O.Box 59237
Renton $1,549,180.00
WA
98058
Engineer's Estimate:$1,244,916.00AGENDA ITEM #8. f)
AB - 3393
City Council Regular Meeting - 07 Aug 2023
SUBJECT/TITLE: Contract for Downtown Business District Clean Initiative
RECOMMENDED ACTION: Refer to Finance Committee
DEPARTMENT: Community & Economic Development Department
STAFF CONTACT: Gina Estep, Economic Development Director
EXT.: (206) 305-3615
FISCAL IMPACT SUMMARY:
The proposed contract sets a maximum compensation of $216,000 to be allocated to Fresh Family for their
cleaning services. This compensation will cover the services rendered by Fresh Family. To meet the financial
requirements of the contract, a budget adjustment in the amount of $216,000 was formally requested and
approved during the second quarter budget adj ustment process. The allocated funds will be sourced from
available resources within the General Fund.
SUMMARY OF ACTION:
The Department of Community and Economic Development issued a Request for Proposals (RFP) for Renton Downtown
Core Cleaning Services within the Renton Downtown Business District (DBD). The DBD encompasses the area bounded
by South 2nd Street and South 3rd Street between Rainier Ave. South, and Mill Ave. South and South 4th Street,
between Burnett Ave. South and Main Ave. South. The RFP aimed to solicit competitive bids from vendors and
independent contractors to provide cleaning services that complement city services within the DBD for a one-year term.
After a thorough evaluation process, Fresh Family was selected. They will be responsible for providing scheduled
sidewalk cleaning, pressure washing services, and minor landscaping services within the designated areas of the DBD.
The contract is expected to commence in August 2023 and continue for a period of 12 months.
The contractor's scope of services includes sidewalk/gutter sweeping, sidewalk pressure washing, trash removal and
container cleaning, graffiti removal, human bio-waste removal, and painting/touch-up/washing as needed. The
frequency of these services will be determined by a regular schedule and on-call services requested by the City. The
contract will adhere to the prevailing wage requirements mandated by the State of Washington.
EXHIBITS:
A. Contract
STAFF RECOMMENDATION:
Authorize the Mayor to sign the contract with Fresh Family for the Downtown Clean Initiative.
AGENDA ITEM #8. g)
SMALL PUBLIC WORKS CONTRACT AGREEMENT
THIS AGREEMENT (“Agreement”) is made as of the 18 day of July 2023, (the “Effective Date”) by
and between the City of Renton, a non-charter code city under RCW 35A, and a Washington
municipal corporation (“City”), Economic Development Department and Fresh Family LLC
Trucking dba Fresh Family, (“Contractor”), a Washington State Limited Liability Company who
are collectively referred to as the “Parties”, to provide cleaning services for the Renton
Downtown Business District (DBD). City and Contractor agree as set forth below.
1. Scope of Work : Contractor will provide all material and labor necessary to perform all
work described in the Scope of Work which is attached and fully incorporated into this
Agreement by reference as Attachment “A.”
2. Changes in Scope of Work: City, without invalidating this Agreement, may order changes
to the Scope of Work consisting of additions, deletions or modifications, the Agreement
Sum being adjusted accordingly by Parties mutual agreement. Such changes in the work
shall be authorized by written Change Order or Amendment signed by the Parties.
3. Time of Performance: Contractor shall commence performance of the Agreement no later
than 30 (thirty) calendar days after the Agreement’s Effective Date.
4. Term of Agreement: The Term of this Agreement shall end at completion of the Scope of
Work, no later than July 30, 2024. This Agreement may be extended to accomplish change
orders, if required, upon mutual written agreement of City and Contractor.
5. Agreement Sum: The total amount of this Agreement is the sum of ($216,000.00) which
includes Washington State Sales Tax. This amount may be adjusted to a mutually agreed
amount based on changes to the Scope of Work.
6. Consideration: In exchange for Contractor’s performance of the items and responsibilities
identified in the Scope of Work, City agrees to make payment of the amount identified as
the Agreement Sum.
7. Prevailing Wage/ Method of Payment/ Retainage/ Bonding: Payment by the City for the
Work will only be made after the Work has been performed and a voucher or invoice is
submitted in a form acceptable to the City.
A. Prevailing Wage Rates:
Contractor must comply with the State of Washington prevailing wage
requirements. Contractor must file an Intent To Pay Prevailing Wage at the
beginning of the project and an Affidavit of Wages Paid at the end of the project
with the Washington State Department of Labor and Industries.
AGENDA ITEM #8. g)
PAGE 2 OF 11
The State of Washington prevailing wage rates applicable for this project, which is
located in King County, may be found at the following website address of the
Department of Labor and Industries:
http://www.lni.wa.gov/TradesLicensing/PrevWage/default.asp
http://www.lni.wa.gov/TradesLicensing/PrevWage/WageRates/default.asp
Pursuant to WAC 296-127-011, the applicable effective date for prevailing wage
rates paid for the duration of this contract shall be the date the contract is
executed as reflected in the “Effective Date” identified at the top of the first page
of this Agreement.
Upon request, the City will provide a copy of the applicable prevailing wages for
this project. Alternatively, the rates may be viewed at the City of Renton City Hall
by making an appointment with the contact person identified herein or prior to
contract award with the contact person identified as the City of Renton contact in
Paragraph 15 Notices of this agreement.
B. Retainage held by the City or in Escrow Account:
Pursuant to RCW Chapter 60.28, a sum equal to five percent (5%) of the monies
earned by the Contractor will be retained from payments made by the City to the
Contractor under this Contract. This retainage shall be used as a trust fund for the
protection and payment (1) to the State with respect to taxes imposed pursuant
to RCW Title 82 and (2) the claims of any person arising under the Contract.
Monies retained under the provisions of RCW Chapter 60.28 shall be:
Contractor must pick one – if contractor does not pick one then the first option
(retainage held in a fund by the City) applies.
_______ Retained in a fund by the City.
or
________ Deposited by the City in an escrow (interest-bearing) account in a bank,
mutual saving bank, or savings and loan association (interest on monies so
retained shall be paid to the Contractor). Deposits are to be in the name of the
City and are not to be allowed to be withdrawn without the City’s written
authorization. The City will issue a check representing the sum of the monies
reserved, payable to the bank or trust company. Such check shall be converted
into bonds and securities chosen by the Contractor as the interest accrues.
At or before the time the Contract is executed, the Contractor shall designate the
option desired. The Contractor in choosing option (2) agrees to assume full
responsibility to pay all costs that may accrue from escrow services, brokerage
AGENDA ITEM #8. g)
PAGE 3 OF 11
charges or both, and further agrees to assume all risks in connection with the
investment of the retained percentages in securities.
The City may also, at its option, accept a bond in lieu of retainage.
C. For Agreements over $150,000:
Pursuant to RCW 60.28 and 39.08 The City requires a 5 % Retainage be withheld
and that the Contractor will provide a Performance and Payment (Contract) Bond
on the City approved form upon execution of the Agreement. Payment of the initial
95% will be made in the next pay cycle of the Renton Finance Department after
receipt of such voucher or invoice (pay cycles are bi-weekly). The remaining 5%
will be retained for the purpose of completion of the project and fulfillment of
claims and liens.
D. For Agreements under $150,000 [RESERVED]
E. For limited Public Works Contracts under $50,000. [RESERVED]
F. City shall have the right to withhold payment to Contractor for any work not
completed in a satisfactory manner until such time as Contractor modifies such
work so that the same is satisfactory.
G. Final Acceptance. Final Acceptance of the Project occurs when the Public Works
Director has determined that the Project is one hundred percent (100%) complete
and has been constructed in accordance with the Plans and Specifications.
H. Payment in the Event of Termination. In the event this Contract is terminated by
the either party, the Contractor shall not be entitled to receive any further amounts
due under this Contract until the work specified in the Scope of Work is
satisfactorily completed, as scheduled, up to the date of termination. At such time,
if the unpaid balance of the amount to be paid under the Contract exceeds the
expense incurred by the City in finishing the work, and all damages sustained by
the City or which may be sustained by the City or which may be sustained by the
reason of such refusal, neglect, failure or discontinuance of Contractor performing
the work, such excess shall be paid by the City to the Contractor. If the City’s
expense and damages exceed the unpaid balance, Contractor and his surety shall
be jointly and severally liable therefore to the City and shall pay such difference to
the City. Such expense and damages shall include all reasonable legal expenses
and costs incurred by the City to protect the rights and interests of the City under
the Contract.
AGENDA ITEM #8. g)
PAGE 4 OF 11
8. Hold Harmless: Contractor shall indemnify, defend and hold harmless City, its elected
officials, officers, agents, employees and volunteers, from and against any and all claims,
losses or liability, or any portion of the same, including but not limited to reasonable
attorneys’ fees, legal expenses and litigation costs, arising from injury or death to persons,
including injuries, sickness, disease or death of Contractor’s own employees, agents and
volunteers, or damage to property caused by Contractor’s negligent act or omission,
except for those acts caused by or resulting from a negligent act or omission by City and
its officers, agents, employees and volunteers.
Should a court of competent jurisdiction determine that this agreement is subject to RCW
4.24.115, (Validity of agreement to indemnify against liability for negligence relative to
construction, alteration, improvement, etc., of structure or improvement attached to real
estate…) then, in the event of liability for damages arising out of bodily injury to persons
or damages to property caused by or resulting from the concurrent negligence of the
contractor and City, its officers, officials, employees and volunteers, Contractor’s liability
shall be only to the extent of Contractor’s negligence.
It is further specifically and expressly understood that the indemnification provided in this
Agreement constitute Contractor’s waiver of immunity under the Industrial Insurance Act,
RCW Title 51, solely for the purposes of this indemnification. The Parties have mutually
negotiated and agreed to this waiver. The provisions of this section shall survive the
expiration or termination of this Agreement.
9. Insurance: Contractor shall secure and maintain:
A. Commercial general liability insurance in the minimum amounts of $1,000,000 for
each occurrence/$2,000,000 aggregate for the Term of this Agreement.
B. Professional liability insurance, in the minimum amount of $1,000,000 for each
occurrence, shall also be secured for any professional services being provided to
City that are excluded in the commercial general liability insurance.
C. Workers’ compensation coverage, as required by the Industrial Insurance laws of
the State of Washington, shall also be secured.
D. It is agreed that on Contractor’s commercial general liability policy, the City of
Renton will be named as an Additional Insured on a non-contributory primary
basis. City’s insurance policies shall not be a source for payment of any Contractor
liability.
E. Subject to City’s review and acceptance, a certificate of insurance showing the
proper endorsements, shall be delivered to City before executing the work of this
Agreement.
AGENDA ITEM #8. g)
PAGE 5 OF 11
F. Contractor shall provide City with written notice of any policy cancellation, within
two (2) business days of their receipt of such notice.
G. Additional Insurance if marked as “Required” by City:
1. ☐ Required. Builders Risk insurance covering interests of the City, the
Contractor, Subcontractors, and Sub-contractors in the work. Builders Risk
insurance shall be on a special perils policy form and shall insure against
the perils of fire and extended coverage and physical loss or damage
including flood, earthquake, theft, vandalism, malicious mischief, and
collapse. The Builders Risk insurance shall include coverage for temporary
buildings, debris removal and damage to materials in transit or stored off-
site. This Builders Risk insurance covering the work will have a deductible
of $5,000 for each occurrence, which will be the responsibility of the
Contractor. Higher deductibles for flood and earthquake perils may be
accepted by the City upon written request by the Contractor and written
acceptance by the City. Any increased deductibles accepted by the City will
remain the responsibility of the Contractor. The Builders Risk insurance
shall be maintained until final acceptance of the work by the City.
2. ☐ Required. Contractors Pollution Liability insurance covering losses
caused by pollution conditions that arise from the operations of the
Contractor. Contractors Pollution Liability insurance shall be written in an
amount of at least $1,000,000 per loss, with an annual aggregate of at least
$1,000,000. Contractors Pollution Liability shall cover bodily injury,
property damage, cleanup costs and defense including costs and expenses
incurred in the investigation, defense, or settlement of claims.
If the Contractors Pollution Liability insurance is written on a claims-made
basis, the Contractor warrants that any retroactive date applicable to
coverage under the policy precedes the effective date of this contract; and
that continuous coverage will be maintained or an extended discovery
period will be exercised for a period of three (3) years beginning from the
time that work under the contract is completed.
The City shall be named by endorsement as an additional insured on the
Contractors Pollution Liability insurance policy.
If the scope of services as defined in this contract includes the disposal of
any hazardous materials from the job site, the Contractor must furnish to
the City evidence of Pollution Liability insurance maintained by the disposal
site operator for losses arising from the insured facility accepting waste
AGENDA ITEM #8. g)
PAGE 6 OF 11
under this contract. Coverage certified to the Public Entity under this
paragraph must be maintained in minimum amounts of $1,000,000 per loss,
with an annual aggregate of at least $1,000,000.
Pollution Liability coverage at least as broad as that provided under ISO
Pollution Liability-Broadened Coverage for Covered Autos Endorsement CA
99 48 shall be provided and the Motor Carrier Act Endorsement (MCS 90)
shall be attached.
10. Discrimination Prohibited: Except to the extent permitted by a bona fide occupational
qualification, the Contractor agrees as follows:
A. Contractor, and Contractor’s agents, employees, representatives, and volunteers
with regard to the Work performed or to be performed under this Agreement,
shall not discriminate on the basis of race, color, sex, religion, nationality, creed,
marital status, sexual orientation or preference, age (except minimum age and
retirement provisions), honorably discharged veteran or military status, or the
presence of any sensory, mental or physical handicap, unless based upon a bona
fide occupational qualification in relationship to hiring and employment, in
employment or application for employment, the administration of the delivery of
Work or any other benefits under this Agreement, or procurement of materials or
supplies.
B. The Contractor will take affirmative action to insure that applicants are employed
and that employees are treated during employment without regard to their race,
creed, color, national origin, sex, age, sexual orientation, physical, sensory or
mental handicaps, or marital status. Such action shall include, but not be limited
to the following employment, upgrading, demotion or transfer, recruitment or
recruitment advertising, layoff or termination, rates of pay or other forms of
compensation and selection for training.
C. If Contractor fails to comply with any of this Agreement’s non-discrimination
provisions, City shall have the right, at its option, to cancel the Agreement in whole
or in part.
D. Contractor is responsible to be aware of and in compliance with all federal, state
and local laws and regulations that may affect the satisfactory completion of the
project, which includes but is not limited to fair labor laws and worker's
compensation.
11. Independent Contractor: Contractor’s employees, while engaged in the performance of
any of Contractor’s Work under this Agreement, shall be considered employees of the
AGENDA ITEM #8. g)
PAGE 7 OF 11
Contractor and not employees, agents, representatives of City and as a result, shall not be
entitled to any coverage or benefits from the City of Renton. Contractor’s relation to City
shall be at all times as an independent contractor. Any and all Workman’s Compensation
Act claims on behalf of Contractor employees, and any and all claims made by a third-party
as a consequence of any negligent act or omission on the part of Contractor’s employees,
while engaged in Work provided to be rendered under this Agreement, shall be the solely
Contractor’s obligation and responsibility.
12. City of Renton Business License: The Consultant shall obtain a City of Renton Business
License prior to performing any Work and maintain the business license in good standing
throughout the term of this agreement with the City.
Information regarding acquiring a city business license can be found at:
http://www.rentonwa.gov/cms/One.aspx?portalId=7922741&pageId=9824882
Information regarding State business licensing requirements can be found at:
http://dor.wa.gov/doing-business/register-my-business
13. Record Keeping and Reporting: Contractor shall maintain accounts and records, which
properly reflect all direct and indirect costs expended and Work provided in the
performance of this Agreement. The Contractor agrees to provide access to and copies of
any records related to this Agreement as required by the City to audit expenditures and
charges and/or to comply with the Washington State Public Records Act (Chapter 42.56
RCW).
14. Public Records Compliance. To the full extent the City determines necessary to comply
with the Washington State Public Records Act, Contractor shall make a due diligent search
of all records in its possession, including, but not limited to, e-mail, correspondence,
notes, saved telephone messages, recordings, photos, or drawings and provide them to
the City for production. In the event Contractor believes said records need to be protected
from disclosure, it shall, at Contractor’s own expense, seek judicial protection. Contractor
shall indemnify, defend, and hold harmless the City for all costs, including attorneys’ fees,
attendant to any claim or litigation related to a Public Records Act request for which
Contractor has responsive records and for which Contractor has withheld records or
information contained therein, or not provided them to the City in a timely manner.
Contractor shall produce for distribution any and all records responsive to the Public
Records Act request in a timely manner, unless those records are protected by court order.
15. Other Provisions:
A. Administration and Notices. Each individual executing this Agreement on behalf
of City and Contractor represents and warrants that such individuals are duly
authorized to execute and deliver this Agreement on behalf of City or Contractor.
AGENDA ITEM #8. g)
PAGE 8 OF 11
Notice: Except for Service of Process in a legal proceeding, any notices required to be
given by the Parties shall be delivered at the addresses set forth below. Any notices
may be delivered personally to the addressee of the notice or may be deposited in the
United States mail, postage prepaid, to the address set forth below. Any notice so
posted in the United States mail shall be deemed received three (3) calendar days after
the date of mailing. Email notice will be deemed received the date of the email so long
as sent before 12:00 noon on a business day, if after 12:00 Noon it will be deemed
received the next business day – a copy of email notice must be mailed as set forth
above. This Agreement shall be administered by and any notices should be sent to the
undersigned individuals or their designees.
CITY OF RENTON
Jessie Kotarski
1055 South Grady Way
Renton, WA 98057
Phone: (425) 430-7271
jkotarski@rentonwa.gov
CONTRACTOR
Ron Jones
8605 S 218th St Kent, WA 98031
Phone: (253) 277-2180
info@freshfamilyco.com
And to:
City Clerk
cityclerk@rentonwa.gov
B. Amendment and Modification. This Agreement may be amended only by an
instrument in writing, duly executed by both Parties.
C. Assignment and Subcontract. Contractor shall not assign or subcontract any
portion of this Agreement without the City of Renton’s prior express written
consent.
D. Compliance with Laws. Contractor and all of the Contractor’s employees shall
perform the Work in accordance with all applicable federal, state, county and city
laws, codes and ordinances. A copy of this language must be made a part of any
contractor or subcontractor agreement.
E. Conflicts. In the event of any inconsistencies between contractor proposals and
this contract, the terms of this contract shall prevail.
F. Governing Law. This Agreement shall be made in and shall be governed by and
interpreted in accordance with the laws of the State of Washington.
AGENDA ITEM #8. g)
PAGE 9 OF 11
G. Joint Drafting Effort. This Agreement shall be considered for all purposes as
prepared by the joint efforts of the Parties and shall not be construed against one
party or the other as a result of the preparation, substitution, submission or other
event of negotiation, drafting or execution.
H. Jurisdiction and Venue. Any lawsuit or legal action brought by any party to enforce
or interpret this Agreement or any of its terms or covenants shall be brought in the
King County Superior Court for the State of Washington at the Maleng Regional
Justice Center in Kent, King County, Washington, or its replacement or successor.
Contractor hereby expressly consents to the personal and exclusive jurisdiction
and venue of such court even if Contractor is a foreign corporation not registered
with the State of Washington.
I. Severability. A court of competent jurisdiction’s determination that any provision
or part of this Agreement is illegal or unenforceable shall not cancel or invalidate
the remainder of this Agreement, which shall remain in full force and effect.
J. Sole and Entire Agreement. This Agreement contains the entire agreement of the
Parties and any representations or understandings, whether oral or written, not
incorporated are excluded.
K. Third-Party Beneficiaries. Nothing in this Agreement is intended to, nor shall be
construed to give any rights or benefits in the Agreement to anyone other than the
Parties, and all duties and responsibilities undertaken pursuant to this Agreement
will be for the sole and exclusive benefit of the Parties and no one else.
L. Waivers. All waivers shall be in writing and signed by the waiving party. Either
party’s failure to enforce any provision of this Agreement shall not be a waiver and
shall not prevent either City or Contractor from enforcing that provision or any
other provision of this Agreement in the future. Waiver of breach of any provision
of this Agreement shall not be deemed to be a waiver of any prior or subsequent
breach unless it is expressly waived in writing.
** SIGNATURE PAGE TO FOLLOW **
AGENDA ITEM #8. g)
PAGE 10 OF 11
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of
Effective Date.
CITY OF RENTON
_____________________________
CONTRACTOR
____________________________
Armondo Pavone, Mayor
1055 South Grady Way
Renton, WA 98057
Ron Jones
8605 S 218th St
Kent, WA 98031
_____________________________
Date
Attest
_____________________________
Jason A. Seth
City Clerk
____________________________
Date
Approved as to Legal Form
_______________________________
M. Patrice Kent
Renton Sr. Assistant City Attorney
Small works Contract 3-16-23 (FILE: CONTRACT/2023/2661)
AGENDA ITEM #8. g)
PAGE 11 OF 11
Attachment A
SCOPE OF WORK
AGENDA ITEM #8. g)
City Information Contractor Information
Name City of Renton Company FRESH FAMILY LLC
Address 1055 S Grady Way Name Debbie Wilson
City, State ZIP Renton, WA 98057 Address 8605 S 218th St
Phone City, State ZIP Kent, WA 98031
Email jkotarski@rentonwa.gov Phone 253-277-2180
Owner Contact Jessie Kotarski Email info@freshfamilyco.com
Project name 2023 Downtown
Clean City Initiative
Contracting
Contact
Ron Jones
206-747-6890
Frequency of Services:
We will provide services four (4) days per week, and in response to City requests within forty-
eight (48) hours for service calls.
Services Expected:
According to the schedule above, we will provide services to clean sidewalks and alleyways,
including but not limited to:
•Sidewalk cleaning
•Pressure washing
•Graffiti removal
•Litter removal
•Hazmat removal
•Seasonal services such as snow (weather permitting) and leaf removal.
These services are outlined in detail in the submitted RFP bid form
Number of Personnel:
We will employee 2 staff members to cover the DBD. 4 hours per workday. Allowing for 1
person for 8 hours when coverage is needed and reasonable. We will primarily look to substitute
the worker before we would
EXHIBIT A: Page 1 of 2AGENDA ITEM #8. g)
Sidewalk/Gutter Sweeping
$120 per hour per worker - Prevailing wage class "Cleanup laborer"
Sidewalk Pressure Washing:
$300 per hour for the service – crew size dependent on service needs. – “Clean up Laborer”
Trash Removal and Container Cleaning
$120 per hour per worker – Prevailing wage class “hazardous worker C”
Graffiti Removal
$120 per hour per worker – Prevailing wage class “Clean Up Labor”
Human Bio-waste
$120 per hour per worker – Prevailing wage class “hazardous worker C”
Painting/touch-up/washing – Prevailing wage class “Painters”
$120.00 per hour per worker for painting and touch-up services.
$132 average cost | $125 Adjusted cost
TOTAL PROPOSED BID MONTHLY COST: $17,333.00 per month
Cost breakdown as $250 per hour. At 4 hours per day for 2 staff members to cover the DBD
area 4 days per week.
EXHIBIT A: Page 2 of 2AGENDA ITEM #8. g)
AB - 3396
City Council Regular Meeting - 07 Aug 2023
SUBJECT/TITLE: Resolution Approving Amendment No. 1 to the Joint Interlocal
Agreement Regarding the Community Development Block Grant
Program
RECOMMENDED ACTION: Council Concur
DEPARTMENT: Equity, Housing, and Human Services Department
STAFF CONTACT: Lori Fleming, Human Services Coordinator
EXT.: 6655
FISCAL IMPACT SUMMARY:
Amendment No. 1 has no fiscal impact.
SUMMARY OF ACTION:
The City is part of the King County Community Development Block Grant (CDBG) Consortium through a Joint
Interlocal Agreement signed with King County in 2014. This Interlocal Agreement delineates the party's roles
and responsibilities in the managing the City's annual federal CDBG funds. King County was recently notified
by the U.S. Department of Housing and Urban Development (HUD) that the agreement does not contain all
the required language regarding fair housing and civil rights obligations and needs to be amended to include
them. This is a technical amendment to state the required language, with King County already meeting the
requirements.
EXHIBITS:
A. Resolution
STAFF RECOMMENDATION:
Adopt the Resolution approving the First Amendment to the Joint Interlocal Agreement Regarding the
Community Development Block Grant Program.
AGENDA ITEM #8. h)
First Amendment to Joint Interlocal Agreement
Page 1 of 4
FIRST AMENDMENT TO THE JOINT INTERLOCAL AGREEMENT
REGARDING THE COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM
BETWEEN THE CITY OF RENTON AND KING COUNTY
This First Amendment to the Interlocal Cooperation Agreement Regarding the Community
Development Block Grant Program between the City of Renton and King County (the “First
Amendment”) is made by and between the City of Renton (“the City”), and King County (“the
County”), both of which entities being a unit of general local government in the State of
Washington and which may be referred to hereinafter individually as a “Party” and collectively
as the “Parties.”
RECITALS
A. On 7/25/2014, pursuant to Ch. 39.34 RCW, the Parties entered that certain Interlocal
Cooperation Agreement Regarding the Community Development Block Grant Program
(the “Agreement”).
B. As acknowledged by the Agreement, the area encompassed by unincorporated King
County and all participating cities has been designated by the United States Department
of Housing and Urban Development (“HUD”) as an urban county for the purpose of
receiving Community Development Block Grant (“CDGB”) funds, as administered under
the Housing and Community Development Act of 1974 (the “Act”).
C. Signatory jurisdictions to the Agreement are CDBG Consortium Partners for purposes of
the Agreement and the Act.
D. Under the Agreement and pursuant to the Act, King County is responsible to the federal
government for all activities undertaken with CDBG funds and for ensuring that all
CDBG assurances and certifications King County is required to submit to HUD under the
Annual Action Plan are met.
E. Urban counties are periodically required to requalify for their entitlement status under
CDGB and related federal programs.
F. Under Notice CPD-23-02, issued by HUD April 10, 2023, and setting forth instructions
for continuing qualification for participating urban counties in the CDBG program for
Fiscal Years 2024-2026, all existing urban counties are required to have incorporated in
their cooperation agreements certain required language regarding fair housing and civil
rights obligations.
G. The Agreement does not contain all the required language regarding fair housing and
civil rights obligations.
DocuSign Envelope ID: 7DA0973D-4FCC-41FC-8149-F01E4E9832EE
In Process
AGENDA ITEM #8. h)
First Amendment to Joint Interlocal Agreement
Page 2 of 4
H. Under Notice CPD-23-02, urban counties have the option of drafting a separate
amendment to their existing cooperation agreements with signatory jurisdictions that
include the required language rather than drafting a new cooperation agreement that
contains the provisions.
I. The purpose of this First Amendment is to expressly state the required language
regarding fair housing and civil rights obligations and to memorialize the attendant
obligations as though set forth in the Agreement.
AGREEMENT
NOW, THEREFORE, in consideration of the terms, conditions and mutual covenants set forth
herein, the Parties agree to amend the Agreement as follows:
1. The foregoing recitals are true and correct in all respects and are incorporated hereby as if
fully set forth herein.
2. Section I of the Agreement is hereby amended and restated in its entirety as follows:
“The County and City agree to cooperate to undertake, or assist in undertaking, community
renewal and lower-income housing assistance activities., funded from annual CDBG, ESG
and HOME Program funds from federal fiscal years 2024, 2025 and 2026 appropriations,
from recaptured funds and from any program income generated from the expenditure of
such funds. These activities include the provision of decent housing, homeless assistance,
and a suitable living environment and economic development opportunities, principally for
persons with very low to moderate incomes. The County and City shall (i) take all actions
necessary to assure compliance with the County’s certification under Section 104(b) of
Title I of the Housing and Community Development Act of 1974, (ii) assure that all CDBG
grants will be conducted and administered in conformity with Title VI of the Civil Rights
Act of 1964, the implementing regulations at 24 CFR part 1, the Fair Housing Act, and the
implementing regulations at 24 CFR part 100, and (iii) affirmatively furthering fair housing
as defined and in accordance with 24 CFR 5.151 and 5.152 and the implementing
regulations at 24 CFR part 8, 24 CFR part 35 and 24 CFR part 146.”
3. Except as specifically provided for in this First Amendment, all other provisions of the
Agreement shall remain unchanged and in full force and effect.
4. Any capitalized terms not defined in this First Amendment shall have the meanings given
them in the Agreement.
5. This First Amendment shall be effective as of the date it has been executed by both
Parties.
DocuSign Envelope ID: 7DA0973D-4FCC-41FC-8149-F01E4E9832EE
In Process
AGENDA ITEM #8. h)
First Amendment to Joint Interlocal Agreement
Page 3 of 4
6. This First Amendment may be executed in counterparts, each of which shall be deemed
to be an original, but all of which together shall constitute one and the same instrument.
[SIGNATURE BLOCKS ON FOLLOWING PAGE]
DocuSign Envelope ID: 7DA0973D-4FCC-41FC-8149-F01E4E9832EE
In Process
AGENDA ITEM #8. h)
First Amendment to Joint Interlocal Agreement
Page 4 of 4
IN WITNESS WHEREOF, the Parties hereto have caused their duly authorized representatives
to execute this First Amendment to the Agreement as of the date set forth below their signatures.
City of Renton
King County
_________________________________ __________________________________
Name: Armondo Parvone
Date:
Title: Mayor
Attest:___________________________
Name: Jason Seth
Title: City Clerk
For King County Executive
By: Simon P. Foster
Title: Division Director
Housing, Homelessness and Community
Development
Department of Community and Human
Services
Approved as to Form: Approved as to Form:
_____________________________
___________________________________
M. Patrice Kent, Sr. Assistant City Attorney Ryan W. Ridings, King County Senior Deputy
Prosecuting Attorney
DocuSign Envelope ID: 7DA0973D-4FCC-41FC-8149-F01E4E9832EE
In Process
AGENDA ITEM #8. h)
1
CITY OF RENTON, WASHINGTON
RESOLUTION NO. _______
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, AUTHORIZING THE
MAYOR AND CITY CLERK TO ENTER INTO FIRST AMENDMENT TO THE JOINT
INTERLOCAL AGREEMENT REGARDING THE COMMUNITY DEVELOPMENT BLOCK
GRANT PROGRAM BETWEEN THE CITY AND KING COUNTY.
WHEREAS, the federal government, through adoption and administration of the Housing
and Community Development Act of 1974 (the “Act”), as amended, makes Community
Development Block Grant (“CDBG”) funds available to King County for expenditure in three-year
funding cycles; and
WHEREAS, by Resolution No. 4220 (July 7, 2014), the City entered into a consortium with
King County and other participating jurisdictions, pursuant to and authorized by the National
Affordable Housing Act of 1990, as amended, 42 USC 12701, et. seq and 24 CFR Part 92 for
purposes of the HOME Investment Partnerships Program (“HOME Program”), and to cooperate
in undertaking HOME Program activities; and
WHEREAS, the City and Kind County remain committed to targeting CDBG and HOME
Program funds to ensure benefits for very low to moderate-income persons as defined by the
United States Department of Housing and Urban Development (“HUD”); and
WHEREAS, the Interlocal Agreement was entered into pursuant to and in accordance with
the Interlocal Cooperation Act, RCW 39.34, for planning the distribution and administration of
CDBG, HOME Program, and other federal funds received from HUD; and
AGENDA ITEM #8. h)
RESOLUTION NO. _______
2
WHEREAS, in order to maintain access to federal funding, HUD has requested updated
language in Section I of the Interlocal Agreement to memorialize federal civil rights and fair
housing requirements which are consistent with the administrative practices of the consortium.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO
RESOLVE AS FOLLOWS:
SECTION I. The Mayor and City Clerk are hereby authorized to enter into the First
Amendment to the Joint Interlocal Agreement Regarding the Community Development Block
Grant Program Between the City and King County, attached as Exhibit “A” and incorporated by
this reference.
PASSED BY THE CITY COUNCIL this ______ day of _____________________, 2023.
______________________________
Jason A. Seth, City Clerk
APPROVED BY THE MAYOR this ______ day of _____________________, 2023.
______________________________
Armondo Pavone, Mayor
Approved as to form:
______________________________
Shane Moloney, City Attorney
RES-EHHS:1948:08.01.2023
AGENDA ITEM #8. h)
RESOLUTION NO. _______
3
EXHIBIT “A”
FIRST AMENDMENT TO THE JOINT INTERLOCAL AGREEMENT
REGARDING THE COMMUNITY DEVELOPMENT BLOCK GRANT
PROGRAM BETWEEN THE CITY OF RENTON AND KING COUNTY
AGENDA ITEM #8. h)
First Amendment to Joint Interlocal Agreement
Page 1 of 4
FIRST AMENDMENT TO THE JOINT INTERLOCAL AGREEMENT
REGARDING THE COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM
BETWEEN THE CITY OF RENTON AND KING COUNTY
This First Amendment to the Interlocal Cooperation Agreement Regarding the Community
Development Block Grant Program between the City of Renton and King County (the “First
Amendment”) is made by and between the City of Renton (“the City”), and King County (“the
County”), both of which entities being a unit of general local government in the State of
Washington and which may be referred to hereinafter individually as a “Party” and collectively
as the “Parties.”
RECITALS
A. On 7/25/2014, pursuant to Ch. 39.34 RCW, the Parties entered that certain Interlocal
Cooperation Agreement Regarding the Community Development Block Grant Program
(the “Agreement”).
B. As acknowledged by the Agreement, the area encompassed by unincorporated King
County and all participating cities has been designated by the United States Department
of Housing and Urban Development (“HUD”) as an urban county for the purpose of
receiving Community Development Block Grant (“CDGB”) funds, as administered under
the Housing and Community Development Act of 1974 (the “Act”).
C. Signatory jurisdictions to the Agreement are CDBG Consortium Partners for purposes of
the Agreement and the Act.
D. Under the Agreement and pursuant to the Act, King County is responsible to the federal
government for all activities undertaken with CDBG funds and for ensuring that all
CDBG assurances and certifications King County is required to submit to HUD under the
Annual Action Plan are met.
E. Urban counties are periodically required to requalify for their entitlement status under
CDGB and related federal programs.
F. Under Notice CPD-23-02, issued by HUD April 10, 2023, and setting forth instructions
for continuing qualification for participating urban counties in the CDBG program for
Fiscal Years 2024-2026, all existing urban counties are required to have incorporated in
their cooperation agreements certain required language regarding fair housing and civil
rights obligations.
G. The Agreement does not contain all the required language regarding fair housing and
civil rights obligations.
DocuSign Envelope ID: 7DA0973D-4FCC-41FC-8149-F01E4E9832EE
In Process
AGENDA ITEM #8. h)
First Amendment to Joint Interlocal Agreement
Page 2 of 4
H. Under Notice CPD-23-02, urban counties have the option of drafting a separate
amendment to their existing cooperation agreements with signatory jurisdictions that
include the required language rather than drafting a new cooperation agreement that
contains the provisions.
I. The purpose of this First Amendment is to expressly state the required language
regarding fair housing and civil rights obligations and to memorialize the attendant
obligations as though set forth in the Agreement.
AGREEMENT
NOW, THEREFORE, in consideration of the terms, conditions and mutual covenants set forth
herein, the Parties agree to amend the Agreement as follows:
1. The foregoing recitals are true and correct in all respects and are incorporated hereby as if
fully set forth herein.
2. Section I of the Agreement is hereby amended and restated in its entirety as follows:
“The County and City agree to cooperate to undertake, or assist in undertaking, community
renewal and lower-income housing assistance activities., funded from annual CDBG, ESG
and HOME Program funds from federal fiscal years 2024, 2025 and 2026 appropriations,
from recaptured funds and from any program income generated from the expenditure of
such funds. These activities include the provision of decent housing, homeless assistance,
and a suitable living environment and economic development opportunities, principally for
persons with very low to moderate incomes. The County and City shall (i) take all actions
necessary to assure compliance with the County’s certification under Section 104(b) of
Title I of the Housing and Community Development Act of 1974, (ii) assure that all CDBG
grants will be conducted and administered in conformity with Title VI of the Civil Rights
Act of 1964, the implementing regulations at 24 CFR part 1, the Fair Housing Act, and the
implementing regulations at 24 CFR part 100, and (iii) affirmatively furthering fair housing
as defined and in accordance with 24 CFR 5.151 and 5.152 and the implementing
regulations at 24 CFR part 8, 24 CFR part 35 and 24 CFR part 146.”
3. Except as specifically provided for in this First Amendment, all other provisions of the
Agreement shall remain unchanged and in full force and effect.
4. Any capitalized terms not defined in this First Amendment shall have the meanings given
them in the Agreement.
5. This First Amendment shall be effective as of the date it has been executed by both
Parties.
DocuSign Envelope ID: 7DA0973D-4FCC-41FC-8149-F01E4E9832EE
In Process
AGENDA ITEM #8. h)
First Amendment to Joint Interlocal Agreement
Page 3 of 4
6. This First Amendment may be executed in counterparts, each of which shall be deemed
to be an original, but all of which together shall constitute one and the same instrument.
[SIGNATURE BLOCKS ON FOLLOWING PAGE]
DocuSign Envelope ID: 7DA0973D-4FCC-41FC-8149-F01E4E9832EE
In Process
AGENDA ITEM #8. h)
First Amendment to Joint Interlocal Agreement
Page 4 of 4
IN WITNESS WHEREOF, the Parties hereto have caused their duly authorized representatives
to execute this First Amendment to the Agreement as of the date set forth below their signatures.
City of Renton
King County
_________________________________ __________________________________
Name: Armondo Parvone
Date:
Title: Mayor
Attest:___________________________
Name: Jason Seth
Title: City Clerk
For King County Executive
By: Simon P. Foster
Title: Division Director
Housing, Homelessness and Community
Development
Department of Community and Human
Services
Approved as to Form: Approved as to Form:
_____________________________
___________________________________
M. Patrice Kent, Sr. Assistant City Attorney Ryan W. Ridings, King County Senior Deputy
Prosecuting Attorney
DocuSign Envelope ID: 7DA0973D-4FCC-41FC-8149-F01E4E9832EE
In Process
AGENDA ITEM #8. h)
AB - 3397
City Council Regular Meeting - 07 Aug 2023
SUBJECT/TITLE: Resolution Approving Amendment No. 1 to the HOME Investment
Partnerships Program Interlocal Cooperation Agreement
RECOMMENDED ACTION: Council Concur
DEPARTMENT: Equity, Housing, and Human Services Department
STAFF CONTACT: Lori Fleming, Human Services Coordinator
EXT.: x6655
FISCAL IMPACT SUMMARY:
Amendment No. 1 has no fiscal impact.
SUMMARY OF ACTION:
The City is part of the King County Community Development Block Grant (CDBG) Consortium which includes
the HOME Investment Partnerships Program that is managed by King County on behalf of the Consortium. An
Interlocal Cooperation Agreement regarding the HOME Investment Partnerships Program was signed between
Renton and King County in 2014. King County was recently notified by the U.S. Department of Housing and
Urban Development (HUD) that the agreement does not contain all the required language regarding fair
housing and civil rights obligations and needs to be amended to include them. This is a technical amendment
to state the required language, with King County already meeting the requirements.
EXHIBITS:
A. Resolution
STAFF RECOMMENDATION:
Adopt the Resolution approving Amendment No. 1 to HOME Investment Partnerships Program Interlocal
Cooperation Agreement.
AGENDA ITEM #8. i)
Amendment No. 1 to Interlocal Cooperation Agreement
Page 1 of 4
AMENDMENT NO. 1 TO HOME INVESTMENT PARTNERSHIPS PROGRAM
INTERLOCAL COOPERATION AGREEMENT
This First Amendment to the Home Investment Partnerships Program Interlocal Cooperation
Agreement between the City of Renton and King County (“Amendment No. 1” or the “First
Amendment”) is made by and between the City of Renton (“the City”), and King County (“the
County”), both of which entities being a unit of general local government in the State of
Washington and which may be referred to hereinafter individually as a “Party” and collectively
as the “Parties.”
RECITALS
A. On 7/25/2014, pursuant to Ch. 39.34 RCW, the Parties entered that certain Interlocal
Cooperation Agreement Regarding the Community Development Block Grant Program
(the “Agreement”).
B. As acknowledged by the Agreement, the area encompassed by unincorporated King
County and all participating cities has been designated by the United States Department
of Housing and Urban Development (“HUD”) as an urban county for the purpose of
receiving Community Development Block Grant (“CDGB”) funds, as administered under
the Housing and Community Development Act of 1974 (the “Act”).
C. Signatory jurisdictions to the Agreement are CDBG Consortium Partners for purposes of
the Agreement and the Act.
D. Under the Agreement and pursuant to the Act, King County is responsible to the federal
government for all activities undertaken with CDBG funds and for ensuring that all
CDBG assurances and certifications King County is required to submit to HUD under the
Annual Action Plan are met.
E. Urban counties are periodically required to requalify for their entitlement status under
CDGB and related federal programs.
F. Under Notice CPD-23-02, issued by HUD April 10, 2023, and setting forth instructions
for continuing qualification for participating urban counties in the CDBG program for
Fiscal Years 2024-2026, all existing urban counties are required to have incorporated in
their cooperation agreements certain required language regarding fair housing and civil
rights obligations.
G. The Agreement does not contain all the required language regarding fair housing and
civil rights obligations.
DocuSign Envelope ID: 8EA4A1AE-C16D-40EE-A3EB-029272725E68
In Process
AGENDA ITEM #8. i)
Amendment No. 1 to Interlocal Cooperation Agreement
Page 2 of 4
H. Under Notice CPD-23-02, urban counties have the option of drafting a separate
amendment to their existing cooperation agreements with signatory jurisdictions that
include the required language rather than drafting a new cooperation agreement that
contains the provisions.
I. The purpose of this First Amendment is to expressly state the required language
regarding fair housing and civil rights obligations and to memorialize the attendant
obligations as though set forth in the Agreement.
AGREEMENT
NOW, THEREFORE, in consideration of the terms, conditions and mutual covenants set forth
herein, the Parties agree to amend the Agreement as follows:
1. The foregoing recitals are true and correct in all respects and are incorporated hereby as if
fully set forth herein.
2. Section 10 of the Agreement is hereby amended and restated in its entirety as follows:
“The County and City agree to cooperate to undertake, or assist in undertaking, community
renewal and lower-income housing assistance activities, funded from annual CDBG, ESG
and HOME Program funds, from recaptured funds and from any program income generated
from the expenditure of such funds. These activities include the provision of decent
housing, homeless assistance, and a suitable living environment and economic
development opportunities, principally for persons with very low to moderate incomes.
The County and City shall (i) take all actions necessary to assure compliance with the
County’s certification under Section 104(b) of Title I of the Housing and Community
Development Act of 1974, (ii) assure that all CDBG grants will be conducted and
administered in conformity with Title VI of the Civil Rights Act of 1964, the implementing
regulations at 24 CFR part 1, the Fair Housing Act, and the implementing regulations at 24
CFR part 100, and (iii) affirmatively furthering fair housing as defined and in accordance
with 24 CFR 5.151 and 5.152 and the implementing regulations at 24 CFR part 8, 24 CFR
part 35 and 24 CFR part 146.”
3. Except as specifically provided for in this First Amendment, all other provisions of the
Agreement shall remain unchanged and in full force and effect.
4. Any capitalized terms not defined in this First Amendment shall have the meanings given
them in the Agreement.
5. This First Amendment shall be effective as of the date it has been executed by both
Parties.
DocuSign Envelope ID: 8EA4A1AE-C16D-40EE-A3EB-029272725E68
In Process
AGENDA ITEM #8. i)
Amendment No. 1 to Interlocal Cooperation Agreement
Page 3 of 4
6. This First Amendment may be executed in counterparts, each of which shall be deemed
to be an original, but all of which together shall constitute one and the same instrument.
[SIGNATURE BLOCKS ON FOLLOWING PAGE]
DocuSign Envelope ID: 8EA4A1AE-C16D-40EE-A3EB-029272725E68
In Process
AGENDA ITEM #8. i)
Amendment No. 1 to Interlocal Cooperation Agreement
Page 4 of 4
IN WITNESS WHEREOF, the Parties hereto have caused their duly authorized representatives
to execute this Amendment No. 1 to the Agreement as of the date set forth below their
signatures.
City of Renton
King County
_________________________________ __________________________________
Name: Armondo Parvone
Date:
Title: Mayor
Attest:___________________________
Name: Jason Seth
Title: City Clerk
For King County Executive
By: Simon P. Foster
Title: Division Director
Housing, Homelessness and Community
Development
Department of Community and Human
Services
Approved as to Form: Approved as to Form:
_____________________________
___________________________________
M. Patrice Kent, Sr. Assistant City Attorney Ryan W. Ridings, King County Senior Deputy
Prosecuting Attorney
DocuSign Envelope ID: 8EA4A1AE-C16D-40EE-A3EB-029272725E68
In Process
AGENDA ITEM #8. i)
1
CITY OF RENTON, WASHINGTON
RESOLUTION NO. _______
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, AUTHORIZING THE
MAYOR AND CITY CLERK TO ENTER INTO AMENDMENT NO. 1 TO THE HOME
INVESTMENT PARTNERSHIPS PROGRAM INTERLOCAL AGREEMENT BETWEEN
THE CITY AND KING COUNTY.
WHEREAS, King County is an urban county as defined by 24 CFR 92.2 and 24 CFR 570.3;
and
WHEREAS, a unit of general local government that is located within an urban county may
be a part of a consortium pursuant to and authorized by the National Affordable Housing Act of
1990, as amended, 42 USC 12701, et. seq and 24 CFR Part 92 for purposes of the HOME
Investment Partnerships Program (“HOME Program”); and
WHEREAS, by Resolution No. 4216 (June 16, 2014), the City entered into a consortium
with King County and other participating jurisdictions, for purposes of the HOME Program, and
to cooperate in undertaking HOME Program activities; and
WHEREAS, the City and King County remain committed to targeting HOME Program funds
to ensure benefits for very low to moderate-income persons as defined by the United States
Department of Housing and Urban Development (“HUD”); and
WHEREAS, the Interlocal Agreement was entered into pursuant to and in accordance with
the Interlocal Cooperation Act, RCW 39.34, for planning the distribution and administration of
CDBG, HOME Program, and other federal funds received from HUD; and
AGENDA ITEM #8. i)
RESOLUTION NO. _______
2
WHEREAS, in order to maintain access to federal funding, HUD has requested updated
language in Section 10 of the Interlocal Agreement to memorialize federal civil rights and fair
housing requirements which are consistent with the administrative practices of the consortium.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO
RESOLVE AS FOLLOWS:
SECTION I. The Mayor and City Clerk are hereby authorized to enter into the First
Amendment to the Joint Interlocal Agreement Regarding the Community Development Block
Grant Program Between the City and King County, attached as Exhibit “A” and incorporated by
this reference.
PASSED BY THE CITY COUNCIL this ______ day of _____________________, 2023.
______________________________
Jason A. Seth, City Clerk
APPROVED BY THE MAYOR this ______ day of _____________________, 2023.
______________________________
Armondo Pavone, Mayor
Approved as to form:
______________________________
Shane Moloney, City Attorney
RES-EHHS:1949:08.01.2023
AGENDA ITEM #8. i)
RESOLUTION NO. _______
3
EXHIBIT “A”
AMENDMENT NO. 1 TO THE HOME INVESTMENT
PARTNERSHIPS PROGRAM INTERLOCAL AGREEMENT
BETWEEN THE CITY OF RENTON AND KING COUNTY
AGENDA ITEM #8. i)
Amendment No. 1 to Interlocal Cooperation Agreement
Page 1 of 4
AMENDMENT NO. 1 TO HOME INVESTMENT PARTNERSHIPS PROGRAM
INTERLOCAL COOPERATION AGREEMENT
This First Amendment to the Home Investment Partnerships Program Interlocal Cooperation
Agreement between the City of Renton and King County (“Amendment No. 1” or the “First
Amendment”) is made by and between the City of Renton (“the City”), and King County (“the
County”), both of which entities being a unit of general local government in the State of
Washington and which may be referred to hereinafter individually as a “Party” and collectively
as the “Parties.”
RECITALS
A. On 7/25/2014, pursuant to Ch. 39.34 RCW, the Parties entered that certain Interlocal
Cooperation Agreement Regarding the Community Development Block Grant Program
(the “Agreement”).
B. As acknowledged by the Agreement, the area encompassed by unincorporated King
County and all participating cities has been designated by the United States Department
of Housing and Urban Development (“HUD”) as an urban county for the purpose of
receiving Community Development Block Grant (“CDGB”) funds, as administered under
the Housing and Community Development Act of 1974 (the “Act”).
C. Signatory jurisdictions to the Agreement are CDBG Consortium Partners for purposes of
the Agreement and the Act.
D. Under the Agreement and pursuant to the Act, King County is responsible to the federal
government for all activities undertaken with CDBG funds and for ensuring that all
CDBG assurances and certifications King County is required to submit to HUD under the
Annual Action Plan are met.
E. Urban counties are periodically required to requalify for their entitlement status under
CDGB and related federal programs.
F. Under Notice CPD-23-02, issued by HUD April 10, 2023, and setting forth instructions
for continuing qualification for participating urban counties in the CDBG program for
Fiscal Years 2024-2026, all existing urban counties are required to have incorporated in
their cooperation agreements certain required language regarding fair housing and civil
rights obligations.
G. The Agreement does not contain all the required language regarding fair housing and
civil rights obligations.
DocuSign Envelope ID: 8EA4A1AE-C16D-40EE-A3EB-029272725E68
In Process
AGENDA ITEM #8. i)
Amendment No. 1 to Interlocal Cooperation Agreement
Page 2 of 4
H. Under Notice CPD-23-02, urban counties have the option of drafting a separate
amendment to their existing cooperation agreements with signatory jurisdictions that
include the required language rather than drafting a new cooperation agreement that
contains the provisions.
I. The purpose of this First Amendment is to expressly state the required language
regarding fair housing and civil rights obligations and to memorialize the attendant
obligations as though set forth in the Agreement.
AGREEMENT
NOW, THEREFORE, in consideration of the terms, conditions and mutual covenants set forth
herein, the Parties agree to amend the Agreement as follows:
1. The foregoing recitals are true and correct in all respects and are incorporated hereby as if
fully set forth herein.
2. Section 10 of the Agreement is hereby amended and restated in its entirety as follows:
“The County and City agree to cooperate to undertake, or assist in undertaking, community
renewal and lower-income housing assistance activities, funded from annual CDBG, ESG
and HOME Program funds, from recaptured funds and from any program income generated
from the expenditure of such funds. These activities include the provision of decent
housing, homeless assistance, and a suitable living environment and economic
development opportunities, principally for persons with very low to moderate incomes.
The County and City shall (i) take all actions necessary to assure compliance with the
County’s certification under Section 104(b) of Title I of the Housing and Community
Development Act of 1974, (ii) assure that all CDBG grants will be conducted and
administered in conformity with Title VI of the Civil Rights Act of 1964, the implementing
regulations at 24 CFR part 1, the Fair Housing Act, and the implementing regulations at 24
CFR part 100, and (iii) affirmatively furthering fair housing as defined and in accordance
with 24 CFR 5.151 and 5.152 and the implementing regulations at 24 CFR part 8, 24 CFR
part 35 and 24 CFR part 146.”
3. Except as specifically provided for in this First Amendment, all other provisions of the
Agreement shall remain unchanged and in full force and effect.
4. Any capitalized terms not defined in this First Amendment shall have the meanings given
them in the Agreement.
5. This First Amendment shall be effective as of the date it has been executed by both
Parties.
DocuSign Envelope ID: 8EA4A1AE-C16D-40EE-A3EB-029272725E68
In Process
AGENDA ITEM #8. i)
Amendment No. 1 to Interlocal Cooperation Agreement
Page 3 of 4
6. This First Amendment may be executed in counterparts, each of which shall be deemed
to be an original, but all of which together shall constitute one and the same instrument.
[SIGNATURE BLOCKS ON FOLLOWING PAGE]
DocuSign Envelope ID: 8EA4A1AE-C16D-40EE-A3EB-029272725E68
In Process
AGENDA ITEM #8. i)
Amendment No. 1 to Interlocal Cooperation Agreement
Page 4 of 4
IN WITNESS WHEREOF, the Parties hereto have caused their duly authorized representatives
to execute this Amendment No. 1 to the Agreement as of the date set forth below their
signatures.
City of Renton
King County
_________________________________ __________________________________
Name: Armondo Parvone
Date:
Title: Mayor
Attest:___________________________
Name: Jason Seth
Title: City Clerk
For King County Executive
By: Simon P. Foster
Title: Division Director
Housing, Homelessness and Community
Development
Department of Community and Human
Services
Approved as to Form: Approved as to Form:
_____________________________
___________________________________
M. Patrice Kent, Sr. Assistant City Attorney Ryan W. Ridings, King County Senior Deputy
Prosecuting Attorney
DocuSign Envelope ID: 8EA4A1AE-C16D-40EE-A3EB-029272725E68
In Process
AGENDA ITEM #8. i)
AB - 3398
City Council Regular Meeting - 07 Aug 2023
SUBJECT/TITLE: Amendment No. 2 to CAG-22-216, King County Community
Development Joint Agreement City Contract 2021/2022, for
Community Development Block Grant Funds Allocated to the
Streetscapes Improvement Project – Phase 2 and Revision to the
Community Development Block Grant Funding Contingency Plan
RECOMMENDED ACTION: Refer to Finance Committee
DEPARTMENT: Equity, Housing, and Human Services Department
STAFF CONTACT: Lori Fleming, Human Services Coordinator
EXT.: 6655
FISCAL IMPACT SUMMARY:
The city has allocated multiple years of Community Development Block Grant (CDBG) funding to the
Streetscapes Improvement Project – Phase 2. The current King County CDBG agreement (CAG-22-216) for
FY2021 funding is $350,292. Amendment No. 2 will add the other years funding as follows:
FY2020 – $46,259 (budgeted/remainder from Streetscapes Phase 1)
FY2021 – $350,292 (budgeted/current contract)
FY2022 – $350,949
FY2023 – $313,697
Total CDBG Funding – $1,061,197
Authorization is requested for additional budget appropriations totaling $664,646 offset by additional grant
revenues of the same amount. An adjustment for the appropriations will be included in the next budget
adjustment ordinance.
SUMMARY OF ACTION:
The city has allocated multiple years of federal Community Development Block Grant (CDBG) funding to the
Streetscapes Improvement Project – Phase 2. The current King County CDBG agreement (CAG-22-216) for
FY2021 funding is $350,292. Amendment No. 2 will add the other years of CDBG funding for a total allocation
of $1,061,197. Additional city funds of $437,000 have also been allocated to the project, for a total project
budget of $1,498,197.
The Streetscapes Improvement Project – Phase 2 is located along Williams Avenue South between South 2nd
and South 3rd streets. Project improvements include new sidewalks, streetlights, street trees, fenced
landscape areas, litter receptacles, and repaving of street and parking areas. Construction bids were due July
20, 2023. Bid opening was held July 24, 2023. City staff is currently evaluating the bids and has tentatively scheduled a
bid award recommendation for Council consideration August 14, 2023. The approval of Amendment No. 2 authorizes
the additional budget appropriation of $664,646 needed for the project. A budget adjustment for budget appropriation
of 2022 and 2023 CDBG funds will be included in the next budget adjustment ordinance.
AGENDA ITEM #8. j)
In addition, the 2022 CDBG Funding Contingency Plan approved by Council on October 11, 2021 needs to be
revised to delete the provision stating any downtown Streetscapes Improvement Project funds not under
contract by December 31, 2022 will be allocated to the Healthy Housing Program (aka Housing Repair). The
Streetscapes Improvement Project – Phase 2 has already accounted for the 2022 CDBG allocation, and
contracting for this allocation funds has been delayed due to project phase shifting and staff changes. The
Healthy Housing Program has received $250,000 in additional funds from the King County Veterans, Seniors,
and Human Services Levy (VSHSL) this year.
EXHIBITS:
A. Amendment No. 2 to CAG-22-216
STAFF RECOMMENDATION:
Authorize the Mayor and City Clerk to execute Amendment No. 2 to CAG-22-216, King County Community Development
Joint Agreement – City Contract 2021/2022 for CDBG funds allocated to the Streetscapes Improvement Project – Phase 2
and authorize the additional budget appropriation of $664,646 from 2022 and 2023 CDBG funds. Staff also recommends
approval of the proposed revision to the 2022 CDBG Funding Contingency Plan.
AGENDA ITEM #8. j)
City of Renton Page 1 of 3 2020 Contract Amendment – 6242242
Department of Community and Human Services
Housing, Homelessness and Community
Development Division
(206) 263-9100 TTY Relay: 711
CONTRACT AMENDMENT
DCHS / Community Development Contract No. 6242242
Project/Exhibit(s) I - Renton Streetscapes Phase II Original Contract Date 05/01/2021
Contractor City of Renton Amendment No. TBD
Address 1055 South Grady Way Amendment Start Date 07/01/2023
Renton, WA 98055-
Amendment Requested By: Amendment Effects:
X Scope of Service
Housing, Homelessness and Community Development
Division
X Time of Performance
X Compensation
Lynn Scherer / (206) 263-1969 Method of Payment
PURPOSE
The purpose of this amendment is to: 1. Extend the contract period to April 30, 2024.2. Add
construction to the scope of services.3. Add additional CDBG funding.4. Add Build America, Buy
America (BABA) rule.
A.STANDARD CONTRACT CHANGES
Change funding table as follows:
Exhibit Name Amount Fund Source
I Renton Streetscapes Phase II $1,061,197 CDBG CFDA #:
14.218
TOTAL $1,061,197
B.EXHIBIT CHANGES
This Amendment adds funding for construction to the Renton Streetscapes Phase II Project.
Section III A.
Add the following paragraph (14)
14. COUNTY staff shall verify that federal Build America, Buy America (BABA) Requirements,
set forth through the United States Infrastructure Investment and Jobs Act, Title IX, Sections
70901-70941 , have been met prior to approving any payment on the PROJECT. Payment will
be withheld for any costs by SUBRECIPIENT, the PRIME or any subcontractor of construction
(2)
AGENDA ITEM #8. j)
City of Renton Page 2 of 3 2020 Contract Amendment – 6242242
that is out of compliance.
Replaces Attachment B: Federal Award Information Number Table with Attachment B as
follows:
Agency Name City of Renton
Agency’s Unique Identifier UG2PSBS6UJJ3
Federal Award Id #’s B-21-UC-530001 B-21-UC-530001 B-21-UC-530001
Federal Award Dates 8/11/2021 8/11/2021 8/11/2021
Agency Periods of
Performance Start/End 5/1/2021-4/30/2024 5/1/2021-4/30/2024 5/1/2021-4/30/2024
Amount of Federal Funds
Obligated by this action by
the pass-through entity to
the subrecipient;
$350,292 $350,949 $313,697
Total Amount of Federal
Funds Obligated to the
subrecipient by the pass-
through entity including the
current financial obligation;
$1,061,197 $1,061,197 $1,061,197
Total Amount of the Federal
Award committed to the
subrecipient by the pass-
through entity;
$1,061,197 $1,061,197 $1,061,197
Assistance Listing Number
and Title; CDFA # 14.218 CDBG CDFA # 14.218 CDBG CDFA # 14.218 CDBG
Dollar amount made
available under each Federal
award and the assistance
listing number at time of
disbursement;
$5,751,697 $5,751,697 $5,751,697
Federal award project description, as required to be responsive
to the Federal Funding Accountability and Transparency Act
(FFATA)
CDBG Funds will pay for sidewalk
and related infrastructure
improvements in a LMI Area in
the Joint Agreement City of
Renton.
Name of Federal awarding agency, pass-through entity, and
contact information for awarding official of the pass-through
entity;
HUD
Carma Reed
Seattle Regional Office
909 1st Ave #200
Seattle, WA 98104
carma.reed@hud.gov
Identification of whether the award is R&D; and No
Indirect cost rate for the Federal award (including if the de
minimis rate is charged per § 200.414 Indirect (F&A) costs).
No Indirect Cost Rate is being
charged.
Is the agency a subrecipient for the purposes of this agreement? Yes
AGENDA ITEM #8. j)
City of Renton Page 3 of 3 2020 Contract Amendment – 6242242
IN WITNESS HEREOF, the parties hereto have caused this amendment to be executed and instituted
on the date first above written.
KING COUNTY
CITY OF RENTON
King County Executive
Signature
Date NAME (Please type or print)
________________________________________
Date
AGENDA ITEM #8. j)
AB - 3394
City Council Regular Meeting - 07 Aug 2023
SUBJECT/TITLE: Parks and Recreation Temporary Event Permit Fee Waiver Requests
8.2023
RECOMMENDED ACTION: Refer to Finance Committee
DEPARTMENT: Parks & Recreation Department
STAFF CONTACT: Roberta Graver, Administrative Assistant
EXT.: 6604
FISCAL IMPACT SUMMARY:
Waiver of Use and Application Fees of $2,760.00
SUMMARY OF ACTION:
The City of Renton provides numerous opportunities to engage in the community, its culture, and its citizens
through single, seasonal, and reoccurring programs and events. Historically, fee waivers are provided to
groups who provide these opportunities, who may not be able to put them on with the added burden of these
logistical parking, use, rental, permit, and application fees. The following groups are requesting fee waivers.
1. The 'Save the Cedar River' organization is putting on a public obstacle cou rse/fun run on August 19, 2023 at
Ron Regis Park; planning for 500-1,000 attendees. This is an event for all ages outside to unite the community
in a fun way and to raise donations to use towards attorney fees to fight saving the Cedar River from an
asphalt plant being built on the river. They say that saving the Cedar River is vital for all community members
of all ages in various ways. They are requesting the full $360.00 in fees waived.
2. Inspired Child Community has been doing in -person outreach to underserved communities in Renton at
Coulon Beach and Renton River Days. They are hosting free swim sessions at the Henry Moses Aquatic Center
for Renton families to enjoy access to life-guarded swimming, ADA accessible swimming opportunities and
enjoy free African Diasporan entertainment during the early session. They will host 2 swim sessions on August
2, 9, 16, and 23rd; expecting 100 attendees at each swim session. Total fees and permits are $4,800.00, they
are requesting a fee reduction of $2,400.00. The remaining is $2,400 is being covered by grants the
organization secured. More details are available in the Fee Waiver Request Form.
EXHIBITS:
A. Fee Waiver Request Save Cedar River 8.2023
B. Fee Waiver Request Dash and Splash 8.2023
STAFF RECOMMENDATION:
Approve the requested fee waivers, totaling $ 2,760.00 in temporary open space rental, use and application
fees.
AGENDA ITEM #8. k)
CITY OF RENTON
PARKS AND RECREATION DEPARTMENT
FEE WAIVER OR REDUCTION REQUEST
Fee waiver and/or reduction requests will be submitted for approval to the City Council via
the Finance Committee.
Request date:
Name of group:
Group contact/number:
Address (Street, State, Zip):
Email address:
Date of event:
Number in party:
Location/Address:
Type of event:
Staff contact/number:
What is the total cost of the rental and applicable fees?
What is the cost of the fee waiver or reduction requested?
Describe event and explain why a reduction or waive of fees will benefit our Renton citizens:
AGENDA ITEM #8. k)
CITY OF RENTON
PARKS AND RECREATION DEPARTMENT
FEE WAIVER OR REDUCTION REQUEST
Fee waiver and/or reduction requests will be submitted for approval to the City Council via
the Finance Committee.
Request date: Tuesday July 25, 2023
Name of group: Inspired Child Community
Group contact/number: 206‐841‐0539
Address (Street, State, Zip): 3823 37th Avenue S Seattle WA 98118
Email address: inspiredchildcommunity@gmail.com
Date of event: August 2, 9, 16, 23 (from 4‐7PM)
Number in party: 100 per event, 400 total
Location/Address: Henry Moses Aquatic Center 1719 Maple Valley Hwy, Renton, WA 98057
Type of event: Dance & Splash!
Families get to get moving together dancing to live music from the African Diaspora and then in the pool
for free swimming.
Staff contact/number: 206‐371‐9493
What is the total cost of the rental and applicable fees? $4,800
AGENDA ITEM #8. k)
What is the cost of the fee waiver or reduction requested? $2400
Describe event and explain why a reduction or waive of fees will benefit our Renton citizens:
This program seeks to address the existing and ongoing racial and financial equity issues associated with
access to aquatics recreation. As well as seeks to provide culturally relevant water exposure and
swimming opportunities to underserved communities with a focus on African American, African
Diasporan, and continental African communities. Water is not only a source of recreation but a natural
wonder and a sacred resource for our community to reconnect to. In particular we are providing, through
these events, free access to life guarded and ADA accessible swimming opportunities for Renton Citizens
as currently there are no life guarded beaches this summer in Renton. In addition Coulon beach has been
closed for weeks due to bacteria issues, however the community is still swimming there. We hope these
events will provide a healthy options for these families.
Inspired Child Community has been doing in‐person outreach to underserved communities in Renton at
Coulon Beach and Renton Rivers Days.
During these programs all participants at the Renton Aquatic Center will be able to enjoy free African
Diasporan entertainment provided from 4‐5 pm.
AGENDA ITEM #8. k)
AGENDA ITEM #8. k)
AB - 3399
City Council Regular Meeting - 07 Aug 2023
SUBJECT/TITLE: 2023 Summer Meals Program in King County
RECOMMENDED ACTION: Refer to Finance Committee
DEPARTMENT: Parks & Recreation Department
STAFF CONTACT: Cailín Hunsaker, Parks and Trails Director
EXT.: 6606
FISCAL IMPACT SUMMARY:
Requesting approval to receive $9,500.00 in grant funding as reimbursements from United Way of King County
for the 2023 Summer Meals Program in King County.
SUMMARY OF ACTION:
City of Renton will actively participate in reducing food insecurity through the 2023 Summer Meals Program in
King County. United Way of King County and partners set a goal of serving over 12,000 meals within the
Renton School District and over 500,000 meals throughout the Puget Sound region. In order to achieve this
goal in Renton, United Way is teaming up with Summer Food Service Program sponsors, such as Renton
School District, to provide meals and snacks to youth ages 18 years and younger.
To complement food service at designated parks and local churches, City staff teams up with AmeriCorps
members to engage youth to participate in recreation activities. Funding from this grant goes toward the
purchase of arts and crafts supplies and sports equipment to support these activities.
Participants work to reduce barriers to participation and increase awareness of the program through
marketing promotions. Specifically, United Way-supported sites utilize and display United Way's Free Summer
Meals marketing materials.
In line with the Renton Business Plan, this Program supports the City's mission to meet growing service
demands with high quality customer service and through partnerships, innovation and outcome management.
EXHIBITS:
A. United Way of King County Grantee Agency Funding Contract 2023
STAFF RECOMMENDATION:
Authorize the Mayor and City Clerk to enter into the agreement with United Way of King County to accept
$9,500.00 in grant funds with spending authority for the 2023 Summer Meals Program in King County.
AGENDA ITEM #8. l)
United Way of King County
Contract No. 15980
This contract is made between United Way of King County and City of Renton (referred to as
"the Contractor").
From June 1, 2023 to August 31, 2023
A. Term and Scope of Contract
Throughout the term of this Agreement, which shall begin on June 1, 2023 and terminate on August
31, 2023, the Contractor shall provide United Way of King County (UWKC) with the scope and range
of services and performance commitments described in the exhibits attached hereto. Such services
shall at all times be provided on a basis that United Way of King County in its sole discretion considers
to be satisfactory, and shall at a minimum be consistent with the performance standards set forth in
Exhibit A-1 attached hereto and incorporated herein by this reference.
The Contractor agrees to comply with all federal and state laws pertaining to charitable organizations
and to maintain its existence and good standing in accordance with such laws. The Contractor agrees to
comply with all UWKC terms, conditions and requirements as stipulated in this contract and exhibits.
At any time during the contract period, UWKC may conduct an audit to verify compliance with
contract terms and Contractor will promptly cooperate with respect to such audit and promptly and
timely comply with UWKC’s requests for information and documentation that UWKC considers to be
necessary or beneficial to the conduct of such audit.
B. Amount of Contract
United Way of King County shall compensate the Contractor according to the payment schedule shown
in Exhibit B for satisfactory performance of the scope and range of services identified in the attached
exhibits; provided, however, that in no event shall the total payments provided to the Contractor by
UWKC hereunder exceed the sum of $9,500.00.
C. Reports and Information
Grantee Agency Funding Contract
United Way's Commitment to Racial Equity
We recognize that…
The United Way of King County (UWKC) benefits from systems of racial inequity and oppression
and operates in a society deeply rooted in white supremacy that perpetuates harm and injustice
for BIPOC people and communities.
Given this, Racial Equity is critical to our work because…
In our role as a grant-maker, fundraiser, and service provider we have a responsibility to restore
power and resources to Black, Indigenous, and People of Color, and communities, address racial
disparities, and support systems change.
All people deserve the opportunity to thrive, manage their own destiny, and contribute their
unique strengths. By centering expertise, and especially the lived experience of BIPOC people
and communities, we can tackle the root causes of inequity to bring us closer to our vision of
justice, liberation, and progress for all.
City of Renton - Contract #15980 page 1 of 8
DocuSign Envelope ID: A5B783E0-6B13-452E-AD77-00AE31F98D66
AGENDA ITEM #8. l)
The Contractor shall timely furnish United Way of King County with (a) the reports and other
information required under the Scope of Work attached as Exhibit A-1 and the Reporting Requirements
attached as Exhibits A-2 and A-3; and (b) such other reports and information as may be requested by
UWKC related to this contract or the services provided hereunder with program funds, including
statements and data demonstrating the effectiveness of the services provided in achieving the goals and
objectives set forth in Exhibit A-1, Scope of Work. The Contractor will timely supplement, augment,
and/or replace any such reports or other information upon request if and to the extent that United Way
of King County finds them to be deficient, incomplete, or otherwise unsatisfactory for its purposes.
UWKC may withhold payments otherwise due to the Contractor pending timely delivery of all such
reports and information (including items requested during any audit conducted pursuant to the
provisions of Paragraph A above).
D. Amendments
United Way of King County, at its sole discretion, may adjust amounts awarded under this contract or
otherwise amend the contract, with at least thirty (30) days’ written notice, for changes in economic and
other conditions affecting our community, including but not limited to:
1.Determination that UWKC revenues are insufficient to meet current or emerging priorities,
or
2.Determination that significant changes in public sector funding warrant changes in UWKC’s
funding.
E. Termination of Contract
If the Contractor fails to meet or comply with the terms of this contract, United Way of King County
may, at its sole discretion, take one or more, without limitation, of the following actions:
1.Work with the Contractor to develop a goal and timeline for compliance
2.Defer payments
3.Eliminate payments
4.Amend the award
5.Terminate the contract
During the contract period, the Contractor will notify UWKC at least thirty (30) days prior to the
effective date should the Contractor plan to discontinue a program that is tied to the funded work.
UWKC may withhold payments and/or terminate all of its contractual obligations hereunder
immediately if, at the sole discretion of UWKC, the Contractor mismanages or makes improper use of
any funds provided hereunder, or refuses to comply with any of the terms and conditions of this
contract. United Way of King County will require repayment of any funds determined by UWKC to be
mismanaged by the Contractor.
F. Entire Agreement
This Agreement consists of nine (9) sections, together with the following exhibits. This Agreement and
the exhibits set forth below contain the entire Agreement of the parties:
Exhibit A1 – Scope of Work
Exhibit A2 – Program Reporting Requirements
Exhibit A3 – Grantee Requirements
G. Governing Law
Exhibit B – Payment Schedule
City of Renton - Contract #15980 page 2 of 8
DocuSign Envelope ID: A5B783E0-6B13-452E-AD77-00AE31F98D66
AGENDA ITEM #8. l)
This Agreement, including all matters of construction, validity and performance, shall be governed by
and construed and enforced in accordance with the laws of the State of Washington, as applied to
contracts made, executed and to be fully performed in such state by citizens of such state, without
regard to its conflict of law rules.
H. No Assignment
Contractor may not assign any right, remedy, obligation, or liability arising under or pursuant to this
Agreement without the consent of UWKC, which may be granted or withheld by UWKC in its
discretion for any reason or no reason.
I. Signatures
The signatures on this document indicate that the parties are in agreement with all stipulations made
herein. Contractor, your signature further indicates that you are currently in compliance with all contract
terms, conditions and requirements.
UNITED WAY OF KING COUNTY CITY OF RENTON
Gordon McHenry, Jr.
President/CEO
Director/CEO Signature*
Director/CEO Name (printed)*
Director/CEO Title (printed)*
Date SignedDate Signed
* Required
June 13, 2023
City of Renton - Contract #15980 page 3 of 8
DocuSign Envelope ID: A5B783E0-6B13-452E-AD77-00AE31F98D66
6/14/2023
Ar
Armondo Pavone
AGENDA ITEM #8. l)
Breaking the Cycle of Poverty Award
Investment Area 3007 Child Nutrition $9,500.00
Investment Area exempt from client demographic data collection
Scope of Work
The Contractor will actively participate in reducing summer hunger through the 2023
Summer Meals program in King County. United Way of King County (UWKC) and partners
have set a goal of serving 500,000 meals this summer. In order to achieve this goal, UWKC is
partnering with Summer Food Service Program sponsors and sites to expand access to meals
and snacks during the summer months while youth are not in school.
As a 2023 Summer Meals program grantee, you will work to reduce barriers to participation
in the program and increase awareness of the program through promotion. Specifically, sites
are expected to utilize and display United Way's Free Summer Meals marketing materials at
United Way supported sites.
DELIVERABLES
The Contractor will operate federal Summer Food Service Program sites in King
County, in accordance with the information and plans submitted to United Way of
King County through the funding process. The Contractor will distribute Free
Summer Meals outreach materials, provided by OSPI and United Way, to
community members within their service area.
AWARD TOTAL
$9,500.00
Exhibit A-1
Scope of Work
City of Renton - Contract #15980 page 4 of 8
DocuSign Envelope ID: A5B783E0-6B13-452E-AD77-00AE31F98D66
AGENDA ITEM #8. l)
Exhibit A-2
Program Reporting Requirements
REQUIREMENT DUE DATE
1.Reporting
The Contractor will provide services as outlined in Exhibit A-1 Scope of Work and
will report to United Way regarding results achieved.
Submission shall be made via email to: mvistica@uwkc.org,
SSeelmeyer@uwkc.org and communityservices@uwkc.org
1.End-of-contract Report should include:
◦An overview of the Contractor’s Summer Meals program and activities
◦Meal counts and program results
◦Accomplishments: describe what you were able to do as a result of
United Way of King County funding
◦Challenges: describe any issues that affected services
◦Recommendations: detail any recommendations for United Way’s
Summer Meals program, including recommendations related to
AmeriCorps deployment, outreach materials, funding, or overall
strategy
◦Success story and at least two photos from Summer Meals program
sites, if available
End-of-contract
Report
10/01/2023
2.Success Story
When requested, the Contractor will arrange for access to program staff and families
for interviews, briefing sessions and other educational opportunities for individuals
and groups such as donors and public officials. United Way will be sensitive to the
number of requests made and will consult the Contractor about scheduling.
The Contractor will work collaboratively with United Way to seek out and respond
to funding opportunities for our core programs in ways that support the overall
expansion in King County and build system sustainability. United Way may arrange
coordination of payment under this contract.
Submission shall be made via email to: mvistica@uwkc.org,
SSeelmeyer@uwkc.org and communityservices@uwkc.org
With End-of-
Contract report
10/01/2023
City of Renton - Contract #15980 page 5 of 8
DocuSign Envelope ID: A5B783E0-6B13-452E-AD77-00AE31F98D66
AGENDA ITEM #8. l)
Exhibit A-3
Grantee Requirements
The Contractor agrees to the following requirements:
1.Non-Discrimination Compliance Measures
The Contractor shall not discriminate on the basis of age, gender, race, sexual
orientation, national origin, religion, presence of a disability, or any other
requirements of federal, state, or local law in the delivery of service. The
Contractor acknowledges and understands United Way of King County’s strong
commitment to and preference for funding contractors who prohibit
discrimination based on age, gender, race, sexual orientation, national origin,
religion and presence of a disability in all areas, including governance,
employment or volunteer recruitment.
Ongoing
2.Anti-Terrorism Compliance Measures
In compliance with the spirit and intent of the USA Patriot Act and other
counterterrorism laws, the Contractor represents that it takes reasonable steps to:
Ongoing
a.Verify that individuals or entities to which it provides, or from which it
receives, funds or other material support or resources are not on the U. S.
Government Terrorist Related Lists*;
b.Protect against fraud with respect to the provision of financial, technical, in-
kind or other material support or resources to persons or organizations on such
lists; and
c.Ensure that it does not knowingly provide financial, technical, in-kind or other
material support or resources to any individual or entity that it knows
beforehand is supporting or funding terrorism (whether through direct
allocation by the United Way of King County Board of Directors or through the
distribution of donor designated funds which it processes for donors
participating in a United Way of King County fundraising campaign).
*In this form, “U. S. Government Terrorist Related Lists” refers to (a) the list of
persons and entities in Executive Order 13244, (b) the master list of Specially
Designated Nationals and Blocked Persons maintained by the Treasury
Department, and (c) the list of Foreign Terrorist Organizations maintained by the
Department of State, as may be updated from time-to-time.
3.If the Contractor has a website, it will display the United Way of King County
logo on its home page with hyperlink to http://www.uwkc.org and the statement,
“Supported by United Way of King County.”
Ongoing
4.The Contractor will display the amount of funding received from United Way of
King County in newsletters, e-newsletters, annual reports or other documents
where it acknowledges funding received.
Ongoing
5.The Contractor will provide copies of electronic or hard-copy newsletters to:
Communications Director, United Way of King County, 720 Second Avenue,
Seattle, WA 98104, or to jerlandson@uwkc.org.
Ongoing
City of Renton - Contract #15980 page 6 of 8
DocuSign Envelope ID: A5B783E0-6B13-452E-AD77-00AE31F98D66
AGENDA ITEM #8. l)
6.The Contractor will maintain an up-to-date listing in the 211 registry.Ongoing
7.If funded for results targeting homeless individuals, the Contractor will comply
with HMIS reporting requirements, unless specifically exempted from
participation. All other results are exempt from this requirement.
Ongoing
8.Throughout the contract period United Way of King County may provide
opportunities for representatives of the Contractor to be involved in its fundraising
campaign. The Contractor shall not use the United Way of King County
fundraising campaign for its own fundraising purposes.
Ongoing
City of Renton - Contract #15980 page 7 of 8
DocuSign Envelope ID: A5B783E0-6B13-452E-AD77-00AE31F98D66
AGENDA ITEM #8. l)
Exhibit B
Payment Schedule
Payment for (month)Date Payable Payment Amount
June 2023 June 30, 2023 $9,500.00
Total Contract $9,500.00
Payment from United Way of King County for this contract shall not exceed $9,500.00 pending receipt of
signed contract from Contractor. Payment(s) to be made on or before the last working day of the month as
per the schedule below.
City of Renton - Contract #15980 page 8 of 8
DocuSign Envelope ID: A5B783E0-6B13-452E-AD77-00AE31F98D66
AGENDA ITEM #8. l)
AB - 3385
City Council Regular Meeting - 07 Aug 2023
SUBJECT/TITLE: Release of Retainage - Cascade Park Playground Equipment
Replacement
RECOMMENDED ACTION: Council Concur
DEPARTMENT: Parks & Recreation Department - PPNR
STAFF CONTACT: Betsy Severtsen, Capital Projects Coordinator
EXT.: 425-757-6657
FISCAL IMPACT SUMMARY:
Retainage release payment for CAG-22-042 in the amount of $16,179.28.
SUMMARY OF ACTION:
The Parks and Recreation Department submits CAG-22-042, Cascade Park Playground Replacement, for
release of retainage. Work began on February 15, 2022, and was completed on February 6, 2023. The
contractor, Northwest Playground Equipment, Inc., met the terms of the contract by supplying playground
equipment, demolishing existing equipment and play area, relocating the playground, installing concrete
curbs, seating areas, drainage, play equipment and engineered wood fiber safety surfacing, and providing
clean-up, site restoration and debris removal.
EXHIBITS:
A. Notice of Completion - CAG-22-042
STAFF RECOMMENDATION:
Approve the project and release of retainage for CAG-22-042, in the amount of $16,179.28, upon all required
lien releases from the State.
AGENDA ITEM #8. m)
F215-038-000 Notice of Completion of Public Works Contract -2020
Notice of Completion of
Public Works Contract
Department Use Only
Assigned to Date Assigned
Date Form Version Revision Reason
Awarding Agency Information
Company Name UBI Number
Address City State Zip Code
Contact Name Phone Number Email Address
Prime Contractor Information
Company Name UBI Number
Address City State Zip Code
Contact Name Phone Number Email Address
Project Information
Project Name Contract Number Affidavit ID Number
Jobsite Address City State Zip Code
Date Awarded Date Work Commenced Date Work Completed Date Work Accepted
Is this a Federally Funded Transportation Project?Yes No If yes, attach the Contract Bond Statement
Have Subcontractors been used?Yes No If yes, complete Addendum A
Contract/Payment Bond Waived? Yes No Retainage Bond Waived? Yes No
Detailed Description of Work Completed
DOR Tax Information
Calculated Amount Liquidated Damages
Additions (+) Amount Disbursed
Reductions (-) Amount Retained
Sub-Total Other
Sales Tax Amount Sales Tax Rate
Total Total
Both totals must to be equal
Apprentice Utilization Information
Was apprentice utilization required?Yes No Engineer’s Estimate:
Utilization %: If utilization did not meet or exceed 15%, was a Good Faith Estimate approved? Yes No
Comments
The Disbursing Officer must submit this completed notice immediately after acceptance of the work done under this contract. No
payment shall be made from the retained funds until receipt of all release certificates and affidavits.
Complete and submit for by email to all three agencies below
Contract Release
(855) 545-8163, option # 4
ContractRelease@LNI.WA.GOV
Employment Security Department
Registration, Inquiry, Standards &
Coordination Unit
(360) 890-3499
publicworks@esd.wa.gov
AGENDA ITEM #8. m)
Subcontractor's Name: UBI Number: (Required)
This addendum can be submitted in other formats.
Provide known affidavits at this time.
For tax assistance or to request this document in an alternate format, please call 1-800-647-7706. Teletype (TTY) users may use the
Washington Relay Service by calling 711.
REV 31 0020e Addendum (10/26/15) F215-038-000 -20
AGENDA ITEM #8. m)
AB - 3389
City Council Regular Meeting - 07 Aug 2023
SUBJECT/TITLE: Agreement between the FBI (JTTF) and the Renton Police Department
RECOMMENDED ACTION: Refer to Public Safety Committee
DEPARTMENT: Police Department
STAFF CONTACT: Ryan Rutledge, Deputy Chief of Police
EXT.: 7512
FISCAL IMPACT SUMMARY:
1.) No budget or additional funding requested
2.) No fund transfers requested
3.) RPD is entering into agreement where staff member, Commander D. Figaro would attend meetings, share
information, and (potentially assist with or act as a liaison) to active federal investigations occurring in and
near the City of Renton.
SUMMARY OF ACTION:
On June 14th 2023 a MOU was submitted by RPD Commander Dan Figaro. The MOU is a part -time agreement
between the FBI (Joint Terrorism Task Force, JTTF) and the Renton Police Department for the purpose of
information sharing and offering local assistance to federal investigations within or having a nexus to the City
of Renton. The FBI has requested a RPD staff member currently holding a federal security clearance and with
federal task force experience to act as the local liaison. Commander Figaro meets the se requirements and has
requested to enter into this agreement for part -time assistance by attending meetings, sharing information,
and assisting (or liaising) with federal investigations. This agreement supports on -going local/federal law
enforcement partnerships. This agreement would help support public safety in our region by having a liaison
with more direct access to information, potential threats, and federal resources. This agreement can be
terminated at any time if decided by the Chief of Police or the FBI's special agent in charge. The MOU shall be
reviewed every three years based on its effective date.
EXHIBITS:
A. MOU BETWEEN THE FBI AND THE RENTON POLICE DEPARTMENT
STAFF RECOMMENDATION:
Enter into this agreement between the Renton Police Department and the FBI (JTTF).
AGENDA ITEM #8. n)
CCUNCLASSIFIED//FOUOSEATTLEJOINTTERRORISMTASKFORCE(JUF)StandardMemorandumofUnderstandingBetweenFEDERALBUREAUOFINVESTIGATIONAndRENTONPOLICEDEPARTMENTPARTIESThisMemorandumofUnderstandingfMOU)isenteredintobyandbetweentheFederalBureauofInvestigation(FBI)andtheRentonPoliceDepartment(hereafter“ParticipatingAgency”).TheFBIandtheParticipatingAgencyarealsoreferredtohereinindividuallyasaPartyorcollectivelyastheParties.AUTHORITIESTheFBIisauthorizedtocoordinateintelligence,investigative,andoperationalresponsestovariouscriminal,cyber,andnationalsecuritythreats,attacks,andintrusionspursuanttovariousstatutoryandexecutiveauthorities.Theseinclude28U.S.C.§533,42U.S.C.§3771,28C.F.R.0.85,ExecutiveOrder12333,asamended,theAttorneyGeneralSection905GuidelinesRegardingDisclosureofForeignIntelligenceAcquiredinaCriminalInvestigation(September23,2002)(AGG-DOM),AnnexIItoNSPD46/HSPD-15;NSPD-54/HSPD-23and18U.S.C.§1030,50U.S.C.§1801,etseq.PURPOSE/PREAMBLEThisMOUistoformalizetherelationshipbetweentheFBIandtheParticipatingAgencyinordertomaximizecooperationandtocreateacohesiveunitcapableofaddressingthemostcomplexterrorisminvestigations.ForpurposesofthisMOU,allmentionsofJTfFalsoincludetheNationalJointTerrorismTaskForce(NJUF).ThisMOUdelineatestheresponsibilitiesandcommitmentsoftheFBIandtheParticipatingAgencyintheSeattleJTTF.ThisMOUisnotintendedto,andshouldnotbeconstruedto,createanyrightorbenefit,substantiveorprocedural,enforceableatlaworotherwisebyanythirdpartyagainsttheParties,theirparentagency,theUnitedStates,ortheofficers,employees,agents,orotherassociatedpersonnelthereof.1NeitherthisdocumentnoritscontentsmaybereleasedwithoutpriorauthorizationofFBIHeadquarters.UNCLASSIFIED//FOUOAGENDA ITEM #8. n)
CcUNCLASSIFIED//FOUOMISSIONThemissionoftheJUFistoleveragethecollectiveresourcesofthePartiesfortheprevention,preemption,deterrenceandinvestigationofterroristactsthataffectUnitedStatesinterests,andtodisruptandpreventterroristactsandapprehendindividualswhomaycommitorplantocommitsuchacts.Tofurtherthismission,theJTTFshallserveasameanstofacilitateinformationsharingamongJUFparticipatingagencies.SUPERVISIONANDCONTROL•AllJTTFpersonnel,onceon-board,willbeunderthesupervisionoftheFBIwhileworkingontheJUFtowhichtheyareassigned.•OverallcommandandmanagementoftheJTTFshallbetheresponsibilityoftheNJTTFSectionChief(SC)andhis/herdesigneeatthelevelofFBIHeadquarters(FBIHQ)ortheAssistantDirectorinCharge(ADIC)orSpecialAgentinCharge(SAC)oftheFBIfieldofficetowhichtheJTTFpersonnelareassigned,andhis/herdesignee.•AllguidanceoninvestigativemattershandledbytheuHFwillbeissuedbytheAttorneyGeneral(AG)ortheFBI.TheFBIwillmakeavailabletotheParticipatingAgencyapplicableguidelinesandpolicies,includingtheAGG-DOMandtheFBI’sDomesticInvestigationsandOperationsGuide(DIOG).•TheADIC,SACortheSCshalldesignateoneSupervisorySpecialAgent(SSA)tosuperviseday-todayoperationalandinvestigativematterspertainingtotheJUF.StaffingissuesaretheresponsibilityoftheFBIchainofcommand.•InordertocomplywithPresidentialDirectives,thepolicyandprogrammanagementoftheJUFistheresponsibilityofFBIHeadquarters(FBIHQ).Theoperationalchainofcommandbeginningatthehighestlevel,ineachJTTFwillbeasfollows:ADIC(ifassigned),SACorSC,AssistantSpecialAgentinCharge(ASAC)orUnitChief(UC),andJUFSSAs.•EachFBIADIC,SAC,orSC,throughhisorherchain-of-command,isresponsibleforadministrativeandoperationalmattersdirectlyassociatedwiththeJUF.OperationalactivitieswillbesupervisedbyFBIJTTFSSAs.StaffingissuesaretheresponsibilityoftheFBIchainofcommand.•TherelevantFBIJUFSSAwillberesponsibleforopening,monitoring,directing,andclosingJTTFinvestigationsinaccordancewithexistingFBIpolicyandtheapplicableUnitedStatesAGGuidelines.•Assignmentsofcasestopersonnelwillbebasedon,ataminimum,experience,training,andperformanceinadditiontothediscretionoftherelevantuHFSSA.STAFFINGCOMMITMENTANDRESPONSIBILITIES•Inlightofthesignificantcostandeffortinon-boardingnewuHFpersonnel,aswellastheneedforcontinuitytosuccessfullycombatnationalsecurity,criminal,andcyberthreats,attacks,andintrusions,theParticipatingAgencyagreestoprovideitspersonneltotheFBIJUFforaperiodofatleasttwo(2)years.ThisMOUimposesnomaximumlimitastothetimethatanyindividualmayremainontheuHF.TheFBIretainsdiscretionoverthelengthofserviceofJUFpersonnel,incoordinationwiththeParticipatingAgency.2NeitherthisdocumentnoritscontentsmaybereleasedwithoutpriorauthorizationofFBIHeadquarters.UNCLASSIFIED//FOUOAGENDA ITEM #8. n)
CCUNCLASSIFIED//FOUO•Duringperiodsofheightenedthreatsandemergencies,theJUFmayneedtooperate24-hoursadayforanextendedperiodoftime.Tofunctionproperly,theJUFdependsupontheuniquecontributionsofeachParticipatingAgency.Duringtheseperiods,allJUFpersonnelareexpectedtosupportJUFactivitiesunlessreleasedtotheParticipatingAgency.•DuetotheoperationalneedsoftheJUF,assignmentoffulltimeJUFpersonneltospecialdetailsordutiesfortheirhomeagencyoutsidetheJTTFbytheParticipatingAgencymustbecoordinatedwiththerelevantuHFSSA.•AlthoughJTTFpersonnelwillreporttohis/herParticipatingAgencyfornon-investigativeadministrativematters,leaverequestswillbecoordinatedwiththeJUFSSAtoensurestaffingavailability.•uHFpersonnelmustadheretotheFBI’sethicalstandardsandtheSupplementalStandardsofEthicalConductforemployeesoftheJusticeDepartment,andthesamerulesandregulationsasFBIemployeeswithregardtosecuritypolicies,conductandactivitieswhileinFBIspace,thehandlingofFBIproperty,theoperationofFBIvehicles,andtheconductofJHFbusiness.•ContinuedassignmenttotheuHFwillbeincoordinationwiththeADICorSACandtheParticipatingAgency.TheFBIADIC,SACorSCretainsthediscretiontoremoveanyJUFpersonnelfromtheuHF.•JTTFpersonnelaresubjecttoremovalfromtheuHFbytheFBIforanyviolationofanyprovisionofthisMOU,theFBI’sethicalstandards,theSupplementalStandardsofEthicalConductforemployeesoftheDepartmentofJustice,anyotherapplicableagreements,rules,andregulations,oratthediscretionoftheFBI.•JHFpersonnelmustsignanacknowledgmentoftheirrespectiverolesandresponsibilitiesbeforecomingon-board.•AllJTTFpersonnelarerequiredtoattendFBIlegaltrainingincompliancewithFBIregulationsandanyothertrainingdeemedmandatoryand/ornecessarybytheFBIchainofcommand.TheFBIisresponsibleforthecostsofsuchtraining.TheParticipatingAgencywillbearthecostsofitstrainingrequiredofitsownemployees.•Theparticipationofotherfederal,state,local,tribal,andterritorialpartnersontheJHFiscriticaltothelong-termsuccessoftheendeavor.Duetocongressionallymandatedreporting,articulatingthelevelofeffortforthesepartnershipsisakeymeasureoftheJHF’sperformance.Accordingly,allJUFpersonnelwillberequiredtorecordtheirworkloadintheTimeUtilizationRecordkeeping(TURK)systemusedbytheFBI.•TheParticipatingAgencywillensurethatdetailedJTTFpersonnelaremedicallyqualifiedaccordingtotheagency’sstandardstoperformJUFduties,includinglawenforcementduties,functions,andresponsibilities.DEFINITIONOFJTTFPERSONNELAsusedinthisMOU,theterm“JHFpersonnel”meansandincludesTaskForceOfficer,TaskForceMember,andTaskForceParticipant,asthosetermsatedefinedinDIOGsection3.ThissectionoftheDIOGisavailableshoulditberequested.DEPUTATIONState,local,tribal,andterritoriallawenforcementofficers(LEO5)whoserveontheJHFmustbefederallydeputizedunderTitle18oftheUSCwhileassignedtotheJHF.TheFBImaylikewiserequire3NeitherthisdocumentnoritscontentsmaybereleasedwithoutpriorauthorizationofFBIHeadquarters.UNCLASSIFIED//FOUOAGENDA ITEM #8. n)
CCUNCLASSIFIED//FOUO-federalLEOswhoserveontheJUFtobedeputizedwhileassignedtotheJUF.TheFBIwillsecuretherequitedauthorizationfordeputations,asneeded.UnderthetermsofthisMOU,theParticipatingAgencyagreesthatnon-LEOsdetailedtotheJUFwillnot:(1)participateinlawenforcementactivities;(2)carryaweapon,eitherlethalornon-lethal;or(3)participateintheexecutionofsearch/arrestwarrants.SECURITYCLEARANCEJTTFpersonnelmayberequiredtohandlesensitiveandclassifiedinformation,haveaccesstoclassifiedsystems,and/orhaveaccesstosecureofficespace.Therefore,uHFpersonnelmustbeeligibletoobtainandmaintainanappropriatesecurityclearance,uptoandincludingTopSecretandaccesstoSensitiveCompartmentalizedInformation(SCI)inaccordancewiththeFBI’sSecurityDivisionPolicies.AllJUFpersonnelwillexecutenon-disclosureagreementsdeemednecessarybytheFBIfortheprotectionofclassifiedandsensitiveinformation,includingbutnotlimitedtoanSF-312,ClassifiedNondisclosureAgreement.SupervisorsintheParticipatingAgencyresponsiblefortheuHFpersonnelmayonlybeprovidedwithclassifiedinformationiftheyhavetheappropriatesecurityclearancetoreceivetheclassifiedinformationandtherequisite“needtoknow.”AllmembersoftheJUFmustcertifytheyhavenotfailedaFBIpolygraphatanytime.IfapotentialuHFmemberhasatonetimefailedaFBIpolygraph,theyarenoteligibletobeinFBIspaceand,therefore,noteligibletobeamemberofthetaskforce.DEADLYFORCEPOLICYNon-FBIJUFpersonnelwillfollowtheParticipatingAgency’spolicyconcerningtheuseofdeadlyforce.Less-than-LethalDevices•PursuanttoSectionVIIIoftheDOJLess-Than-LethalDevicesPolicydatedMay16,2011,allstate/localofficersparticipatinginJTTFoperationsmustbemadeawareofandadheretothepolicyanditslimitsonDO]officers.•TheParticipatingAgencyofeachindividualassignedtotheJUFwillensuretheagency’spoliciesandproceduresforuseofanyless-than-lethaldevicethatwillbecarriedbyJUFpersonnelareconsistentwiththeDOJpolicystatementontheUseofLess-Than-LethalDevices.•TheParticipatingAgencyofeachindividualassignedtotheuHFwillensurethat,whiletheindividualisparticipatinginFBI-led]UFoperationsinthecapacityofJHFpersonnel,theindividualwillcarryonlyless-than-lethaldevicestheParticipatingAgencyhasissuedtotheindividual,andonwhichtheindividualhasbeentrained,inaccordancewiththeagency’spoliciesandprocedures.COORDINATIONIntelligence,lawenforcement,andoperationalactionswillbecoordinatedandcooperativelycarriedoutwithintheJHF.TheParticipatingAgencywillnotknowinglyactunilaterallyonanymatter4NeitherthisdocumentnoritscontentsmaybereleasedwithoutpriorauthorizationofFBIHeadquarters.UNCLASSIFIED//FOUOAGENDA ITEM #8. n)
CCUNCLASSIFIED//FOUOaffectingtheJUF.ThePartiesagreethemattersdesignatedtobehandledbytheJUFshallnotknowinglybesubjecttonon-JUFornon-FBIintelligence,lawenforcement,oroperationaleffortsbytheParticipatingAgency.Alllawenforcementactionswillbecoordinatedandcooperativelycarriedout.TheJUF’scriminalinvestigativeprocedureswillconformtotherequirementsoftheFBIandforfederalprosecution.ItisexpectedthattheappropriateUnitedStatesAttorney,inconsultationwiththeFBIandaffectedJUFpartners,willdetermineonacase-by-casebasiswhethertheprosecutionofcaseswillbeatthefederalorstatelevel,baseduponwhichwouldbetteradvancetheinterestsofjustice.AllmediareleasesinvolvingJTTFmatterswillbeconductedbytheFBI.Nopressreleaseinvolvinga]UFmatterwillbeissuedwithoutpriorFBIapproval.CONFIDENTIALHUMANSOURCES•ThedisclosureofFBIinformants,orConfidentialHumanSources(CHSs),tonon-JUFpersonnelwillbelimitedtothosesituationswhereitisessentialtotheeffectiveperformanceoftheJUF,andonlyafterapprovalbyanFBIsupervisoryemployee.ThesedisclosureswillbeconsistentwithapplicableFBIguidelines.•Non-FBIJUFpersonnelmaynotmakeanyfurtherdisclosureoftheidentityofanFBICHS,includingtootherindividualsassignedtotheJUF.Nodocumentswhichidentify,tendtoidentify,ormayindirectlyidentifyanFBICHSmaybereleasedwithoutpriorFBIapproval.•InthoseinstanceswheretheParticipatingAgencyprovidesaCHS,theFBImay,atthediscretionoftheSACandincoordinationwiththeParticipatingAgency,becomesolelyresponsiblefortheCHS’scontinueddevelopment,operation,andcompliancewithnecessaryadministrativeproceduresregardingoperationandpaymentassetforthbytheFBI.•TheUnitedStatesAGGuidelinesandFBIpolicyandprocedureforoperatingFBICHSsshallapplytoallCHSsopenedandoperatedinfurtheranceofFBIJTTFinvestigations.Documentationof,andanypaymentsmadeto,FBICHSsshallbeinaccordancewithFBIpolicyandprocedure.•Operation,documentation,andpaymentofanyCHSopenedandoperatedinfurtheranceofauHFinvestigationmustbeinaccordancewiththeUnitedStatesAGGuidelines,regardlessofwhetherthehandlingagencyisanFBIuHFParticipatingAgency.Documentationofstate,county,orlocalCHSsopenedandoperatedinfurtheranceofJHFinvestigationsshallbemaintainedatanagreeduponlocation.•AllJTTFundercoveroperationswillbeconductedandreviewedinaccordancewithFBIguidelinesandtheAttorneyGeneral’sGuidelinesonFederalBureauofInvestigationUndercoverOperations.TheParticipatingAgencymayberequestedtoenterintoanadditionalagreementifanemployeeoftheParticipatingAgencyisassigneddutieswhichrequiretheofficertoactinanundercovercapacity.INFORMATIONSHARING/REPORTSANDRECORDS•AllinvestigativeandintelligencereportingwillbepreparedanddisseminatedincompliancewithFBIpolicy,assetforthinDIOGsection14.Subjecttoanylegalorpolicyrestrictions,copiesofdocumentscreatedforauHFmatterbaseduponinformationobtainedfromparticipationontheuHFbyanyuHFpersonnelwillbeconsideredtobefederaldocumentsunderthecontroloftheFBIandshallbemaintainedinaccordancewithFBIrecordsmanagementpolicyandapplicable5NeitherthisdocumentnoritscontentsmaybereleasedwithoutpriorauthorizationofFBIHeadquarters.UNCLASSIFIED//FOUOAGENDA ITEM #8. n)
CCUNCLASSIFIED//FOUO—law.AllJTTFmaterialsandinvestigativerecords,includinganyMOUs,originatewith,belongto,andwillbemaintainedbytheFBI.•AllinformationlearnedduringthecourseofaJTfFinvestigationissubjecttoFBIinformationsharingpoliciesandmaynotbedisclosedoutsideoftheFBIwithouttheapprovaloftheFBIJUFSupervisor.LikeanyFBIemployee,JUFpersonnelmaynotdiscloseanyFBIorJUF-relatedinformationoutsideoftheFBI,includinganydisclosuretotheParticipatingAgency,withoutthepriorapprovaloftheFBIJUFSSA.•AlluHFmaterialsandinvestigativerecordsoriginatewith,belongto,andwillbemaintainedbytheFBI,toincludebutnotlimitedto:MOUs,interviewreports(i.e.FD-302),interviewnotes,surveillancelogs,subpoenaedrecords,orotherinvestigativeinformation.AllinformationgeneratedinthecourseofinvestigationsbytheJTTFwillbecontrolledsolelybytheFBIandmayonlyberemovedfromFBIspacewiththeapprovaloftheJTTFSSA.AllofficialrecordsandinformationwillbekeptinaccordancewithestablishedFBIrecordsmanagementandretentionpolicies.•JTTFpersonnelarestrictlyprohibitedfromdisclosinganyunclassifiedinformationtoindividualswithoutaneedtoknow.LikeanyFBIemployee,JTfFpersonnelarestrictlyprohibitedfromdisclosinganyclassifiedinformationtoindividualswhodonotpossesstheappropriatesecurityclearanceandaneedtoknow.TheParticipatingAgencyagreestohaveuHFpersonnelsignanFD-868(NondisclosureAgreementforJointJUFMembers,Contractors,Detailees,Assignees,andInterns).ThisactionobligatesanindividualparticipatingintheJUF,whoisacceptingapositionofspecialtrustwithaccesstoclassifiedandotherwisesensitiveinformation,tobeboundbyprepublicationreviewtoprotectagainsttheunauthorizeddisclosureofsuchinformation.•JUFinformationmayidentifyindividualswhoseinformationmaybeprotectedbythePrivacyActof1974and“UnitedStatespersons”whoseinformationmaybeprotectedbyExecutiveOrder12333(asamendedoranysuccessorthereto).Allsuchinformationshallbehandledlawfullypursuanttotheprovisionsthereof.•JUFpersonnelmayberequiredtohandleandprocessProtectedCriticalInfrastructureInformation,asdefinedbylawandregulatedbytheU.S.DepartmentofHomelandSecurity(DHS).AllJUFpersonnelwilluseanddiscloseDHSPCIIinaccordancewithapplicablelawandregulation.•JUFpersonnelmustalsocomplywithallapplicabledisseminationrestrictionswhensharinginformationwithnon-JUFindividuals.Suchrestrictionsincludebutarenotlimitedtoclassificationrules,grandjuryinformation,foreigngovernmentinformation,andanyoriginatorcontrolledcaveats.•TheFBIandtheParticipatingAgencywillimmediatelyreporttoeachothereveryinstancewhereindatareceivedfromeachotherisused,disclosed,oraccessedinanunauthorizedmanner(includinganydatalossesorbreaches).•TheFBIandtheParticipatingAgencyagreetoabidebytheDOJPrivacy,CivilRights,andCivilLibertiesProtectionPolicyfortheInformationSharingEnvironment(January25,2010)totheextentthatanyuHF-relatedinformationiscoveredbythatpolicy.Ataminimum,theFBIandParticipatingAgencyshallnotifyeachotherofanyerroneousdisclosureofinformationconcerningaU.S.citizenorlegalpermanentresidentalienandtakereasonablestepstocorrectsucherror.SALARY/OVERTIMECOMPENSATION/FUNDING•Subjecttofundingavailabilityandlegislativeauthorization,theFBImayreimbursetheParticipatingAgencyforthecostofovertimeworkedbydeputizednon-federalLEOsassignedfull6NeitherthisdocumentnoritscontentsmaybereleasedwithoutpriorauthorizationofFBIHeadquarters.UNCLASSIFIED//FOUOAGENDA ITEM #8. n)
CCUNCLASSIFIED//FOUOtimetotheJUF,providedovertimeexpenseswereincurredasaresultofJUFrelatedduties.AseparateCostReimbursementAgreement(CRA)mustbeexecutedbetweentheFBIandtheParticipatingAgency,consistentwithregulationsandpolicy.Otherwise,overtimeshallbecompensatedinaccordancewithapplicableParticipatingAgencyovertimeprovisions.•TheParticipatingAgencyJTTFpersonnelwilleachreporttohisorherrespectiveagencyforpersonneladministrativematters.TheParticipatingAgencyshallberesponsibleforthepay,overtime,leave,performanceappraisals,andotherpersonnelmattersrelatingtoitsemployeesdetailedtoanFBIJTTF.•TheFBIwillprovideofficespaceforalluHFpersonnelmembersandsupportstaff.Inaddition,theFBIwillprovideallnecessarysecretarial,clerical,automation,andtechnicalsupportfortheJUFinaccordancewithFBIguidelinesandprocedures.TheFBIwillprovideallfurnitureandofficeequipment.•TheintroductionofofficeequipmentandfurnitureintoFBIspacebytheParticipatingAgencyisdiscouraged,asanysuchmaterialissubjecttoexaminationfortechnicalcompromise,whichmayresultinitsbeingdamagedordestroyed.•Subjecttofundingavailabilityandlegislativeauthority,theFBImayprovideequipment,suchasavehicle(butonlytonon-federalLEOswhoworkonthemE),fuelpurchasecard(butonlytonon-federalLEOswhoworkontheJUF),andsmartphone,toJUFpersonnelforuseincarryingoutJUFrelatedduties.Receivingpersonnelwillberequiredtoexecuteacceptableuseagreementsbeforebeingissuedtheseitems.•EmployeesoftheParticipatingAgency(non-federalLEOsonly)maybepermittedtodriveFBIownedorleasedvehiclesforsurveillance,casemanagementandinvestigationinconnectionwithanyJTTFinvestigation.FBIownedorleasedvehicleswillonlybemadeavailabletonon-federalLEOs,andmayonlybeusedinaccordancewithapplicableFBIrulesandregulations.•EmployeesoftheParticipatingAgencywhoareassignedanFBIownedorleasedvehiclemustsignandabidebythefollowingagreement:“FBINATIONALVEHICLELEASEVEHICLEUSEAGREEMENT—NON-FBIPERSONNEL.”•AnycivilliabilityarisingfromtheuseofanFBI-ownedorleasedvehiclebyanindividualfromaParticipatingAgencywhileengagedinanyconductotherthanhisorherofficialdutiesandassignmentsunderthisMOUshallnotbetheresponsibilityoftheFBIortheUnitedStates.Totheextentpermittedbyapplicablelaw,theParticipatingAgencywillholdharmlesstheFBIandtheUnitedStatesforanyclaimforpropertydamageorpersonalinjuryarisingfromanyuseofanFBIownedorleasedvehiclebyanindividualfromtheParticipatingAgencythatisoutsideofthescopeofhisorherofficialdutiesandassignmentsunderthisMOU.•Forofficialinventorypurposes,allequipmentincludingfuelcards,radios,badges,credentialsandotherformsofiTTFidentificationsubjecttoFBIpropertyinventoryrequirementswill,uponrequest,beproducedbyeachindividualwhoparticipatesintheiHE.•Atthecompletionofanindividual’sassignmentontheJUF,uponrequest,oruponwithdrawalorterminationoftheParticipatingAgencyfromtheJUF,allFBIequipmentandpropertywillbereturnedtothesupplyingagencyinaccordancewithFBIpolicy.•ThisMOUisnotanobligationorcommitmentoffundsnorabasisforatransferoffunds.EvenwhereoneofthePartiestothisMOUhasagreed(orlaterdoesagree)toassumeaparticularfinancialresponsibility,suchParty’sexpresswrittenapprovalmustbeobtainedbeforeincurringanyexpenseexpectedtobeassumedbytheotherParty.AllobligationsofanexpendituresbythePartiestothisMOUwillbesubjecttoeachParty’srespectivebudgetaryandfiscalprocesses7NeitherthisdocumentnoritscontentsmaybereleasedwithoutpriorauthorizationofFBIHeadquarters.UNCLASSIEIED//FOUOAGENDA ITEM #8. n)
CCUNCLASSIFIED//FOUOandavailabilityoffundspursuanttoallapplicablelaws,regulations,andpolicies.ThePartiestothisMOUacknowledgethatthereisnointimation,promise,orguaranteethatfundswillbeavailableinfutureyears.TRAVELAllJUFrelatedtravelofnon-FBIpersonnelrequirestheapprovaloftheJUFSSA,andParticipatingAgencyauthorization,priortotravel.Toavoiddelayinoperationaltravel,theParticipatingAgencywillprovidegeneraltravelauthoritytoallofitsparticipatingemployeesforthedurationoftheemployee’smembershipintheuHF.Fordomestictravel,uHFpersonnelwillberesponsibleforappropriatenotificationswithinhisorherParticipatingAgency,aswellasstandardFBItravelapprovalsandnotification.TheJTTFwillobtainEBIHUauthorizationandcountryclearancesforuHFpersonnelrequiredtotraveloutsidetheUnitedStates.TheFBIwillpaycostsfortravelinaccordancewiththeFederalTravelRegulationsofallJUFpersonneltoconductinvestigationsoutsidethefieldofficeorhomeagencyterritory.LIABILITYGeneral.ThePartiesacknowledgethatthisMOUdoesnotalterapplicablelawgoverninganyclaimforcivilliabilityarisingoutofanyactivityconductedpursuanttothisMOUorotherwiserelatingtothisMOU.TheDepartmentofJusticefDOJ)may,initsdiscretion,determineonacase-by-casebasisthatanindividualshouldbeaffordedlegalrepresentation,legaldefense,orindemnificationofaciviljudgment,pursuanttofederallawandDOJpolicyandregulations.CommonLawTortClaims•CongresshasprovidedthattheexclusiveremedyforthenegligentorwrongfulactoromissionofanemployeeoftheU.S.Government,actingwithinthescopeofhisorheremployment,shallbeanactionagainsttheUnitedStatesundertheFederalTortClaimsAct(FTCA),28U.S.C.§1346(b),and§2671-2680.•ForthelimitedpurposeofdefendingcivilclaimsarisingoutofJHFactivity,anemployeedetailedfromaParticipatingAgencywhoisactingwithinthecourseandscopeofhisorherofficialdutiesandassignmentspursuanttothisMOUmaybeconsideredan“employee”oftheU.S.government,asdefinedat22U.S.C.§2671.See5U.S.C.§3374fc)(2).•UndertheFederalEmployeeLiabilityReformandTortCompensationActof1998(commonlyknownastheWestfallAct),see28U.S.C.§2679(b)f1),ifanemployeeoftheUnitedStatesisnamedasadefendantinacivilaction,theAttorneyGeneralorhisorherdesigneemaycertifythatthedefendantactedwithinthescopeofhisorheremploymentatthetimeoftheincidentgivingrisetothesuit.28U.S.C.§2679(d)f1)&f2)TheUnitedStatescanthenbesubstitutedfortheemployeeasthesoledefendantwithrespecttoanytortclaimsallegedintheaction.28U.S.C.§2679(d)(1)&(2).Decisionstocertifythatanemployeewasactingwithinthescopeofhisorheremploymentatthetimeoftheincidentgivingrisetothesuit,see28U.S.C.§2679(1)&(2),aremadeonacase-by-casebasis,andsuchcertificationcannotbeguaranteed.8NeitherthisdocumentnoritscontentsmaybereleasedwithoutpriorauthorizationofFBIHeadquarters.UNCLASSIFIED//FOUOAGENDA ITEM #8. n)
CCUNCLASSIFIED//FOUO•IftheAttorneyGeneraldeclinestocertifythatanemployeewasactingwithinthescopeofemployment,“theemployeemayatanytimebeforetrialpetitionthecourttofindandcertifythattheemployeewasactingwithinthescopeofhisofficeoremployment.”28U.S.C.§2679(d)(3).ConstitutionalClaims•LiabilityforviolationsoffederalconstitutionallawmayrestwiththeindividualfederalagentorofficerpursuanttoBivensv.SixUnknownNamesAgentsoftheFederalBureauofNarcotics,403U.S.388(1971)orpursuantto42U.S.C.§1983forstateofficers.•Federal,state,local,andtribalofficersenjoyqualifiedimmunityfromsuitforconstitutionaltorts,“insofarastheirconductdoesnotviolateclearlyestablishedstatutoryorconstitutionalrightsofwhichareasonablepersonwouldhaveknown.”Harlowv.Fitzgerald457U.S.800(1922).•IfanyParticipatingAgency’sJUFpersonnelarenamedasadefendantinhisorherindividualcapacityinacivilactionallegingconstitutionaldamagesasaresultofconducttakenwithinthescopeofJUF-relatedduties,theindividualmayrequestrepresentationbyDOJ.28C.F.R.§50.15,50.16.•Anemployeemaybeprovidedrepresentation“whentheactionsforwhichrepresentationisrequestedreasonablyappeartohavebeenperformedwithinthescopeoftheemployee’semployment,andtheAttorneyGeneral,orhisorherdesignee,determinesthatprovidingrepresentationwouldotherwisebeintheinterestoftheUnitedStates.”28C.F.R.§50.15(a).•AwrittenrequestforrepresentationbyJUFpersonnelshouldbedirectedtotheAttorneyGeneralandprovidedtotheChiefDivisionCounsel(CDC)oftheFBIdivisioncoordinatingtheJTTF.TheCDCwillforwardtherepresentationrequesttotheFBI’sOfficeoftheGeneralCounsel(OGC),togetherwithaletterheadmemorandumconcerningthefactualbasisofthelawsuit.FBI’sOGCwillthenforwardtherequesttotheCivilDivisionofDO],togetherwithanagencyrecommendationconcerningscopeofemploymentandDO]representation.28C.F.R.§50.15(a)(3).•IfanyJUFpersonnelisfoundtobeliableforaconstitutionaltort,heorshemayrequestindemnificationfromDOJtosatisfyanadversejudgmenttenderedagainsttheemployeeinhisorherindividualcapacity.28C.F.R.§50.1Sfc)f4).ThecriteriaforpaymentaresubstantiallysimilartothoseusedtodeterminewhetherafederalemployeeisentitledtoDO]representationunder28C.F.R.50.15(a).•DeterminationsconcerninglegalrepresentationandindemnificationbytheUnitedStatesatediscretionaryandaremadebyDO]onacase-by-casebasis.TheFBIcannotguaranteethattheUnitedStateswillprovidelegalrepresentation,legaldefense,orindemnificationtoanyfederalorstateemployeedetailedtotheJUF,andnothinginthisMOUshallbedeemedtocreateanylegalrightonthepartofanyJUFpersonnel.ExpressReservations•ThePartiesdonotwaiveanyapplicabledefensesand/orlimitationsonliability.9NeitherthisdocumentnoritscontentsmaybereleasedwithoutpriorauthorizationofFBIHeadquarters.UNCLASSIFIED//FOUOAGENDA ITEM #8. n)
CCUNCLASSIFIED//FOUONoassignmentofrights,duties,orobligationsofthisMOUshallbemadebyanyPartywithouttheexpresswrittenapprovalofadulyauthorizedrepresentativeofallotherParties.DURATIONThisMOUshallbereviewedeverythreeyearsbaseduponitseffectivedate,butmaybeterminatedatanytimeuponwrittenmutualconsentoftheFBIandtheParticipatingAgencyinvolved.ThisMOUwillremainineftectuntilitisterminatedbywrittenmutualconsentoftheFBIandParticipatingAgency,oruntilsuchtimeanewMOUisexecutedbetweentheFBIandtheParticipatingAgency.AnyParticipatingAgencymaywithdrawfromtheJUFatanytimebywrittennotificationtotheADIC,SAC,SCorsubstantiveunitatFBIHeadquartersatleast60dayspriortowithdrawal.UponterminationofthisMOU,allequipmentprovidedtotheJTfFwillbereturnedtothesupplyingParticipatingAgency.Inaddition,whenaParticipatingAgencywithdrawsfromtheMOU,theParticipatingAgencywillreturnequipmenttothesupplyingParticipatingAgency.Similarly,anyremainingParticipatingAgencywillreturntoawithdrawingParticipatingAgencyanyunexpendedequipmentsuppliedbythewithdrawingParticipatingAgency.FORFEITURETheFBIshallberesponsibleforprocessingassetsseizedforfederalforfeitureinconjunctionwithJUFoperations.Assetforfeitureswillbeconductedinaccordancewithfederallaw,andtherulesandregulationssetforthbytheFBIandDOJ.ForfeituresattributabletoJUFinvestigationsmaybeequitablysharedwiththeagencyparticipatingintheJTTF.DISPUTERESOLUTIONIncasesofoverlappingjurisdiction,thePartiesagreetoworkinconcerttoachievetheJTTF’smissionandobjectives.ThePartiesagreetoattempttoresolveanydisputesregardingjurisdiction,caseassignments,workload,etc.,atthefieldlevelfirstbeforereferringthemattertosupervisorypersonnelforresolution.MODIFICATIONSThisagreementinnomanneraffectsanyexistingagreementswiththeFBIoranyotheragency.Thisagreementmaybeamendedonlybymutualwrittenconsentoftheparties.ThemodificationsshallhavenoforceoreffectunlesssuchmodificationsarereducedtowritingandsignedbyanauthorizedrepresentativeoftheFBIandtheParticipatingAgency.10NeitherthisdocumentnoritscontentsmaybereleasedwithoutpriorauthorizationofFBIHeadquarters.UNCLASSIFIED//FOUOAGENDA ITEM #8. n)
CUNCLASSIFIED//FOUOCSIGNATORIES:______________________________________________Date:________ArmondoPavoneMayor,CityofRenton______________________________________________Date:________RichardA.CollodiSpecialAgent-in-ChargeSeattleFieldOfficeFederalBureauofInvestigation11NeitherthisdocumentnoritscontentsmaybereleasedwithoutpriorauthorizationofFBIHeadquarters.UNCLASSIFIED//FOUOAGENDA ITEM #8. n)
AB - 3390
City Council Regular Meeting - 07 Aug 2023
SUBJECT/TITLE: Compensate Communication and Engagement Manager at Step E,
Grade m30
RECOMMENDED ACTION: Refer to Finance Committee
DEPARTMENT: Police Department
STAFF CONTACT: Jon Schuldt, Chief
EXT.: 7555
FISCAL IMPACT SUMMARY:
This request will have no fiscal impact for 2023, it was budgeted as part of the department's 2023 budget and
has gone unfilled until our anticipated hire date on or around September 1, 2023. the first 9 months of salary
savings by not having this position filled will offset the increase in compensation. An additional $14,129.52 will
be added to the 2024 budget as part of the mid -bi budget adjustment.
SUMMARY OF ACTION:
Candidate for the position of Police Communications and Engagement Manager Meeghan Black has earned a
bachelor's degree from the University of Washington in Political Science and Communications. Over her
career she has worked in broadcast television as a news anchor, reporter, producer and host. Meeghan has
worked in public relations and as a media specialist consultant. Currently she works for the Bellevue Police
Department as the Public Information Officer, where her duties include overseeing internal and external
communications, social media channels and media relations as well as discover, plan and execute community
engagement opportunities. She also coaches and trains staff on interacting with the media.
These and many other attributes make Meeghan an extremely qualified and highly sought after candidate.
EXHIBITS:
N/A
STAFF RECOMMENDATION:
Authorize the Administration to compensate candidate for the position Police Communications and
Engagement Manager, Meeghan Black, at Step E of salary grade m30 upon hire date.
AGENDA ITEM #8. o)
AB - 3402
City Council Regular Meeting - 07 Aug 2023
SUBJECT/TITLE: Agreement to Forfeit Real Property located at 16218 49th Ave. S.
Tukwila WA 98188
RECOMMENDED ACTION: Refer to Finance Committee
DEPARTMENT: Police Department
STAFF CONTACT: Jon Schuldt, Chief of Police
EXT.: 7555
FISCAL IMPACT SUMMARY:
The property has about $500,000 in equity, and the approximate market value of the property is $1.1M. After
the property is acquired and prepared for sale, 17% of the final sale pr oceeds will be returned to the Claimants
and the City will keep the remaining 83%. These proceeds will be deposited into the Police Drug Forfeiture
fund.
SUMMARY OF ACTION:
In the fall of 2021, the Renton Police Department seized two houses, including the real property located at
16218 49th Ave. S. in Tukwila, WA, for intended forfeiture due to the houses' connection to drug
manufacturing. The owners of both houses submitted a claim to the properties, effectively commencing a
lawsuit against the City of Renton. The City retained Kenyon Disend as its counsel to oversee this legal process.
In June, the parties finalized the attached CR 2(A) Agreement to resolve the dispute. The City effectively takes
ownership of the Tukwila house with the intention of preparing it for a future sale. After accounting for the
City's expenses to prepare it for sale, the City then agrees to pay 17% of the net proceeds once it is sold to the
claimants, which will conclude the transaction.
Pursuant to Council policy 800-12, the council must approve this agreement before the City can assume
ownership of the property. Once the City assumes ownership of the property, it will be prepared for sale, and
the City will keep 83% of the proceeds, which must be deposited into the City's drug forfeiture fund by state
law.
EXHIBITS:
A. CR 2A Agreement & Exhibit A
STAFF RECOMMENDATION:
Approve the agreement forfeiting the real property located at 16218 49th Ave. S. in Tukwila, WA to the City of
Renton.
AGENDA ITEM #8. p)
AGENDA ITEM #8. p)
AGENDA ITEM #8. p)
AGENDA ITEM #8. p)
05/31/2023
Hillary J. Evans
Attorney for City of Renton
AGENDA ITEM #8. p)
AGENDA ITEM #8. p)
AB - 3405
City Council Regular Meeting - 07 Aug 2023
SUBJECT/TITLE: Grant Approval: Edward Byrne FY 2023 Justice Assistance Grant
RECOMMENDED ACTION: Refer to Finance Committee
DEPARTMENT: Police Department
STAFF CONTACT: Chandler Swain, Commander
EXT.: 7573
FISCAL IMPACT SUMMARY:
There is no grant match required for the acceptance of these funds. Authorization is requested for additional
budget appropriations in the amount of $35,106 offset by additional grant revenues of the same am ount and
will be included in the budget adjustment.
SUMMARY OF ACTION:
The Renton Police Department has been awarded funds from the Edward Byrne Memorial Justice Assistance Grant for
the past 19 years. This year we have been awarded funds that will assist with victim advocate overtime costs,
training conference for crimes against women, peer support training, and a ViDoc hand held single point
measurement device with 3D scanning. that will be used to scan and record serious traffic collisions and crimes
scenes.
The conference for crimes against women is a training conference we have found beneficial and select
officers and/or sergeants from divisions to attend. This grant funds the entire training for 3 to 4 employees
and our domestic violence advocate. This training has been attended for several years, each year paid for
by this grant.
Peer to peer training is a yearly conference in which we send 2 to 3 peer support employees to get up to
date strategies and programs to bring back to our department. This training and our peer support program
assists officers with learning ways to cope with stresses of the job, home life, and financial issues. This grant
has paid for this important training for the past two years.
This year's grant was written to purchase a handheld 3D scanner made by ViDoc. This device quickly documents crimes
scenes and traffic collisions using Lidar technology. This device will replace our total station, which is technology we
have been using since early 2000’s. It will also greatly reduce hours spent processing traffic collisions and crime scenes.
EXHIBITS:
A. Grant MOU
B. JAG Budget Worksheet
STAFF RECOMMENDATION:
Approve the Edward Byrne Memorial Justice Assistance Grant (JAG) agreement in order to receive up to
$35,106 in reimbursements to support the department's domestic violence victim ad vocacy program.
AGENDA ITEM #8. q)
23-00258 Renton FY22 JAG MOU Contract Page 1 of 7
Memorandum of Understanding -Contract
Edward Byrne Memorial
Justice Assistance Grant (JAG) Program
FY 2022 Local Solicitation
Executed by
City of SeattleDepartmentAuthorizedRepresentative: Kathryn Finau6105thAvenuePOBox34986Seattle, WA 98124-4986
and
City of Renton, UEI UG2PSBS6UJJ3, hereinafter referred to as “Subrecipient” JAG Grant Manager: Commander Swain1055SGradyWayRenton, WA 98057-3232
CAG-23-059
AGENDA ITEM #8. q)
23-00258 Renton FY22 JAG MOU Contract Page 2 of 7
IN WITNESS WHEREOF, the parties have executed this Agreement by having theirrepresentativesaffixtheirsignaturesbelow.
City of Renton City of Seattle
Armondo Pavone, Mayor Brian Maxey, Chief Operating OfficerSeattlePoliceDepartment
Date: _________ Date: ____________
Authorized by: Edward Byrne Memorial Justice Assistance Grant (JAG) ProgramWHEREAS, the Justice Assistance Grant (JAG) Program is the primary provider of federalcriminaljusticefundingtostateandlocaljurisdictions; andWHEREAS, the JAG Program supports all components of the criminal justice system, frommulti-jurisdictional drug and gang task forces to crime prevention and domesticviolenceprograms, courts, corrections, treatment, and justice information sharinginitiatives; andWHEREAS, the United States Congress authorized $829,956 in the Justice Assistance Grant (JAG) Program for jurisdictions in King County; andWHEREAS, 13 jurisdictions in King County were required to apply for a JAG Program awardwithasingle, joint application; andWHEREAS, the City of Seattle (“City”), as the identified Fiscal Agent, had DOJ submit thejointapplicationtotheBureauofJusticeAssistanceonAug8, 2022 to request JAGProgramfunds; andWHEREAS, based on the City’s successful application, the Bureau of Justice Assistance hasawarded $829,956 to the City from these JAG Program funds; andWHEREAS, pursuant to the terms of the grant whereby the City, as the identified FiscalAgentforthisaward, is to distribute grant funds to co-applicants, the City intends totransfersomeoftheJAGfundsitreceivestothoseco-applicants; andWHEREAS, the City is not obligated to continue or maintain grant funding levels for the JAGProgramoncegrantfundshavelapsed; andWHEREAS, Subrecipients of JAG funds from the City should not anticipate the City willassumeresponsibilityforanyprogramcostsfundedbyJAGonceJAGfundsarespent;
NOW THEREFORE, the parties hereto agree as follows:
Attest:
Jason A. Seth, City Clerk
3-2-2023
Brian Maxey (Mar 7, 2023 12:50 PST)
03/07/2023
AGENDA ITEM #8. q)
23-00258 Renton FY22 JAG MOU Contract Page 3 of 7
This Interagency Agreement contains seven Articles:
ARTICLE I: TERM OF AGREEMENTThetermofthisInteragencyAgreement shall be in effect from the date it is executed, untilSeptember30, 2025, unless terminated earlier pursuant to the provisions hereof.
ARTICLE II: DESCRIPTION OF SERVICESTheservicestobeperformedunderthisAgreement shall be conducted for the statedpurposesoftheByrneMemorialJusticeAssistanceGrant (JAG) Program (42 U.S.C. 3751(a.) The Edward Byrne Memorial Justice Assistance Grant (JAG) Program is the primaryprovideroffederalcriminaljusticefundingtostateandlocaljurisdictions. The JAGProgramprovidesstatesandunitsoflocalgovernmentswithcriticalfundingnecessary tosupportarangeofprogramareasincludinglawenforcement; prosecution and courtprograms; prevention and education programs; corrections and community corrections; drug treatment and enforcement; crime victim and witness initiatives; and planning, evaluation, and technology improvement programs.
ARTICLE III: SPECIAL CONDITIONS1. Funds are provided by the U.S. Department of Justice, Office of Justice Programs, BureauofJusticeAssistancesolelyforthepurposeoffurtheringthestatedobjectivesoftheEdwardByrneMemorialJusticeAssistanceGrant (JAG) Program. The Subrecipient shallusethefundstoperformtasksasdescribedintheScopeofWorkportionofthisAgreement. 2. The Subrecipient acknowledges that because this Agreement involves federal funding, the period of performance described herein will likely begin prior to the City’s receiptofappropriatedfederalfunds. The Subrecipient agrees that it will not hold the City ortheDepartmentofJusticeliableforanydamages, claim for reimbursement, or any typeofpaymentwhatsoeverforservicesperformedunderthisAgreementpriortotheCity’sreceiptanddistributionoffederalfunds. 3. This contract is funded with federal grant funds under CFDA 16.738. The grant is FY2022JusticeAssistanceGrantProgramAward #15PBJA-22-GG-02095-JAGX. All federalfinancialandgrantmanagementrulesandregulationsmustbeadheredtointheexecutionofthiscontract. Exhibit Attachment A is a copy of the federal awarddocuments. All special conditions stated in the award documents apply to the executionofthiscontract. All Subrecipients are assumed to have read, understood, and acceptedtheAwardasbinding. 4. The Subrecipient acknowledges that all allocations and use of funds under thisagreementwillbeinaccordancewiththeEdwardByrneMemorialJusticeAssistanceGrant (JAG) Program: FY 2022 Local Solicitation. Allocation and use of grant fundingmustbecoordinatedwiththegoalsandobjectivesincludedintheLocalSolicitation. AllSubrecipientsareassumedtohaveread, understood, and accepted the LocalSolicitationasbinding.
AGENDA ITEM #8. q)
23-00258 Renton FY22 JAG MOU Contract Page 4 of 7
5. Subrecipient agrees to obtain a valid DUNS profile and create an active registration withtheCentralContractorRegistration (CCR) database no later than the due date of theSubrecipient’s first quarterly report after a subaward is made. 6. The Subrecipient shall comply with all applicable laws, regulations, and programguidance. The Uniform Administrative Requirements, Cost Principles, and AuditRequirementsin2C.F.R. Part 200, as adopted and supplemented by the Department ofJustice (DOJ) in 2 C.F.R Part 2800 (together, the “Part 200 Uniform Requirements”) apply to this 2020 award from the Office of Justice Programs (OJP). 7. The Subrecipient must comply with the most recent version of the AdministrativeRequirements, Cost Principals, and Audit Requirements. a. Non-Federal entities that expend $750,000 or more in one fiscal year in Federalawardsshallhaveasingleorprogram-specific audit conducted for that year inaccordancewiththeOfficeofManagementandBudget (OMB) Circular A-133-Audits of States, Local Governments, and non-Profit Organizations. Non-federalentitiesthatspendlessthan $750,000 a year in federal awards are exempt fromfederalauditrequirementsforthatyear, except as noted in Circular No. A-133, butrecordsmustbeavailableforrevieworauditbyappropriateofficialsoftheFederalagency, pass-through entity, and General Accounting Office (GAO). b. Subrecipients required to have an audit must ensure the audit is performed inaccordancewithGenerallyAcceptedAuditingStandards (GAAS), as found in theGovernmentAuditingStandards (the Revised Yellow Book) developed by theComptrollerGeneralandtheOMBComplianceSupplement. The Subrecipient hastheresponsibilityofnotifyingtheWashingtonStateAuditor’s Office andrequestinganaudit. c. The Subrecipient shall maintain auditable records and accounts so as to facilitatetheauditrequirementandshallensurethatanysub-recipients also maintainauditablerecords. d. The Subrecipient is responsible for any audit exceptions incurred by its ownorganizationorthatofitssubcontractors. Responses to any unresolvedmanagementfindingsanddisallowedorquestionedcostsshallbeincluded withtheauditreportsubmittedtotheSeattlePoliceDepartment. The Subrecipientmustrespondtorequestsforinformationorcorrectiveactionconcerningauditissuesorfindingswithin30daysofthedateofrequest. The City reserves the righttorecoverfromtheSubrecipientalldisallowedcostsresultingfromtheaudit. e. If applicable, once any single audit has been completed, the Subrecipient mustsendafullcopyoftheaudittotheCityandaletterstatingtherewerenofindings, or if there were findings, the letter should provide a list of the findings. TheSubrecipientmustsendtheauditandtheletternolaterthanninemonthsafter theendoftheSubrecipient’s fiscal year(s) to: Kathryn Finau, JAG Program ManagerSeattlePoliceDepartment
AGENDA ITEM #8. q)
23-00258 Renton FY22 JAG MOU Contract Page 5 of 7
610 5th AvenuePOBox34986Seattle, WA 98124-4986206-233-3722Kathryn.finau3@seattle.gov
f. In addition to sending a copy of the audit, the Subrecipient must include acorrectiveactionplanforanyauditfindingsandacopyofthemanagement letter ifonewasreceived. The Subrecipient shall include the above audit requirements inanysubcontracts. g. The Subrecipient agrees to cooperate with any assessments, national evaluationefforts, or information or data collection requirements, including, but not limitedto, the provision of any information required for assessment or evaluation ofactivitieswithinthisagreement, and for compliance BJA reporting requirements. h. Suspension and Debarment: The Subrecipient certifies that neither it nor itsprincipalsarepresentlydebarred, suspended, proposed for debarment, declaredineligible, or voluntarily excluded from participating in transactions by anyFederaldepartmentoragency. By signing and submitting this Agreement, theSubrecipientisprovidingthesignedcertificationsetoutbelow. The certificationthisclauseisamaterialrepresentationoffactuponwhichreliancewasplacedwhenthistransactionwasenteredinto. If it is later determined that the Subrecipient rendered an erroneous certification, the Federal Government and City may pursue available remedies, includingterminationand/or debarment. The Subrecipient shall provide immediate writtennoticetotheCityifatanytimetheSubrecipientlearnsthatitscertificationwaserroneouswhensubmittedorhasbecomeerroneousbyreasonofchangedcircumstances. The Subrecipient agrees by signing this Agreement that it shall not enter into anycoveredtransactionwithapersonorsubcontractorwhoisdebarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded fromparticipationinthiscoveredtransaction, unless authorized in writing by the City. The Subrecipient shall include the requirement in this section in any subcontracts.
ARTICLE IV: SCOPE OF WORKTheScopeofWorkofthisAgreement and the time schedule for completion of such work isasdescribedinAttachmentB: JAG Budget Worksheet, as approved by BJA. Attachment B isattachedtoandmadepartofthisagreement. The work shall, at all times, be subject to the City’s general review and approval. TheSubrecipientshallconferwiththeCityperiodicallyduringtheprogressoftheWork, andshallprepareandpresentsuchinformationandmaterials (e.g. a detailed outline ofcompletedwork) as may be pertinent, necessary, or requested by the City or BJA todeterminetheadequacyoftheWorkorSubrecipient’s progress.
AGENDA ITEM #8. q)
23-00258 Renton FY22 JAG MOU Contract Page 6 of 7
ARTICLE V: PAYMENT1. CompensationTheSubrecipient shall be reimbursed on an actual cost basis. Compensation under thisAgreementcannotexceed $33,532. The Subrecipient shall incur authorized allowable expenses in accordance with theProjectBudget, as detailed in Attachment B. The Subrecipient may request additional reimbursement up to the amount of interestaccruedontheirportionofthegrantaward. The City will provide quarterly statementstotheSubrecipient, once the interest balance accrued equals at least $1,000. Reimbursements will not be made for interest accrued that is less than $1,000. Reimbursements can be requested, up to the total amount of interest accrued, after theinitialquarterlystatementhasbeensent, to perform tasks in accordance with theProjectBudget, as detailed in Attachment B. No travel or subsistence costs, including lodging and meals, reimbursed with federalfundsmayexceedfederalmaximumrates, which can be found at: http://www.gsa.gov. 2. Manner of PaymentTheSubrecipientshall submit reimbursement requests not more than monthly, and atleastquarterly. After the first quarter, monthly submission is preferred. Requests are due no later than 30 days after the end of the period in which the workwasperformed. Reimbursement request forms are provided. Substitute forms areacceptable. With each reimbursement request, the Subrecipient shall submit: Detailed spreadsheet of expenditures by task and related financial documents (timesheets, invoices) These documents and invoices must be kept on file by the Subrecipient and be madeavailableuponrequestbytheCityortostateorfederalauditors, for at least sixyearsaftertheclosureofthegrant. Reimbursement will not be processed without accompanying documentation for thecorrespondingcosts. Once the above conditions are met, payment shall be made by theCitytotheSubrecipient. Submit invoicing to Submit Documentation toFiscalAccountsPayableSeattlePoliceDepartment6105thAvenuePOBox34986Seattle, WA 98124-4986SPDAP@seattle.gov
Kathryn Finau, JAG Program ManagerSeattlePoliceDepartment6105thAvenuePOBox34986Seattle, WA 98124-4986206-233-3722Kathryn.finau3@seattle.gov
AGENDA ITEM #8. q)
23-00258 Renton FY22 JAG MOU Contract Page 7 of 7
ARTICLE VI. COOPERATION IN MONITORING AND EVALUATION1. SPD Responsibilities: SPD shall monitor, evaluate and provide guidance and direction to Subrecipient in theconductofApprovedServicesperformedunderthisAgreement. SPD has theresponsibilitytodeterminewhetherSubrecipienthasspentfundsinaccordance withapplicablelaws, regulations, including the federal audit requirements and agreementsandshallmonitortheactivitiesofSubrecipienttoensurethatSubrecipienthasmetsuchrequirements. SPD may require Subrecipient to take corrective action ifdeficienciesarefound. SPD will not monitor Subrecipient’s adherence to SpecialConditions31-41 and 70 in the Grant Award and Special Conditions documents. 2. Subrecipient Responsibilities. a. Subrecipient shall permit SPD to carry out monitoring and evaluation activities, including any performance measurement system required by applicable law, regulation, funding sources guidelines or by the terms and conditions of theapplicableNoticeofPrimeAward, and Subrecipient agrees to ensure, to the greatestextentpossible, the cooperation of its agents, employees and board members insuchmonitoringandevaluationefforts. This provision shall survive the expirationorterminationofthisAgreement. b. Subrecipient shall cooperate fully with any reviews or audits of the activities underthisAgreementbyauthorizedrepresentativesofSPD, DOJ, the U.S. GovernmentAccountabilityOfficeortheComptrollerGeneraloftheUnitedStatesandSubrecipientagreestoensuretotheextentpossiblethecooperationofitsagents, employees and board members in any such reviews and audits. This provision shallsurvivetheexpirationorterminationofthisAgreement.
ARTICLE VII: AMENDMENTSNomodificationoramendment of the provisions hereof shall be effective unless in writingandsignedbyauthorizedrepresentativesofthepartieshereto. The parties heretoexpresslyreservetherighttomodifythisAgreement, by mutual agreement.
AGENDA ITEM #8. q)
23-00258 Renton FY22 JAG MOU Contract Page 1 of 7
Memorandum of Understanding -Contract
Edward Byrne Memorial
Justice Assistance Grant (JAG) Program
FY 2022 Local Solicitation
Executed by
City of SeattleDepartmentAuthorizedRepresentative: Kathryn Finau6105thAvenuePOBox34986Seattle, WA 98124-4986
and
City of Renton, UEI UG2PSBS6UJJ3, hereinafter referred to as “Subrecipient” JAG Grant Manager: Commander Swain1055SGradyWayRenton, WA 98057-3232
CAG-23-059
AGENDA ITEM #8. q)
23-00258 Renton FY22 JAG MOU Contract Page 2 of 7
IN WITNESS WHEREOF, the parties have executed this Agreement by having theirrepresentativesaffixtheirsignaturesbelow.
City of Renton City of Seattle
Armondo Pavone, Mayor Brian Maxey, Chief Operating OfficerSeattlePoliceDepartment
Date: _________ Date: ____________
Authorized by: Edward Byrne Memorial Justice Assistance Grant (JAG) ProgramWHEREAS, the Justice Assistance Grant (JAG) Program is the primary provider of federalcriminaljusticefundingtostateandlocaljurisdictions; andWHEREAS, the JAG Program supports all components of the criminal justice system, frommulti-jurisdictional drug and gang task forces to crime prevention and domesticviolenceprograms, courts, corrections, treatment, and justice information sharinginitiatives; andWHEREAS, the United States Congress authorized $829,956 in the Justice Assistance Grant (JAG) Program for jurisdictions in King County; andWHEREAS, 13 jurisdictions in King County were required to apply for a JAG Program awardwithasingle, joint application; andWHEREAS, the City of Seattle (“City”), as the identified Fiscal Agent, had DOJ submit thejointapplicationtotheBureauofJusticeAssistanceonAug8, 2022 to request JAGProgramfunds; andWHEREAS, based on the City’s successful application, the Bureau of Justice Assistance hasawarded $829,956 to the City from these JAG Program funds; andWHEREAS, pursuant to the terms of the grant whereby the City, as the identified FiscalAgentforthisaward, is to distribute grant funds to co-applicants, the City intends totransfersomeoftheJAGfundsitreceivestothoseco-applicants; andWHEREAS, the City is not obligated to continue or maintain grant funding levels for the JAGProgramoncegrantfundshavelapsed; andWHEREAS, Subrecipients of JAG funds from the City should not anticipate the City willassumeresponsibilityforanyprogramcostsfundedbyJAGonceJAGfundsarespent;
NOW THEREFORE, the parties hereto agree as follows:
Attest:
Jason A. Seth, City Clerk
3-2-2023
AGENDA ITEM #8. q)
23-00258 Renton FY22 JAG MOU Contract Page 3 of 7
This Interagency Agreement contains seven Articles:
ARTICLE I: TERM OF AGREEMENTThetermofthisInteragencyAgreement shall be in effect from the date it is executed, untilSeptember30, 2025, unless terminated earlier pursuant to the provisions hereof.
ARTICLE II: DESCRIPTION OF SERVICESTheservicestobeperformedunderthisAgreement shall be conducted for the statedpurposesoftheByrneMemorialJusticeAssistanceGrant (JAG) Program (42 U.S.C. 3751(a.) The Edward Byrne Memorial Justice Assistance Grant (JAG) Program is the primaryprovideroffederalcriminaljusticefundingtostateandlocaljurisdictions. The JAGProgramprovidesstatesandunitsoflocalgovernmentswithcriticalfundingnecessary tosupportarangeofprogramareasincludinglawenforcement; prosecution and courtprograms; prevention and education programs; corrections and community corrections; drug treatment and enforcement; crime victim and witness initiatives; and planning, evaluation, and technology improvement programs.
ARTICLE III: SPECIAL CONDITIONS1. Funds are provided by the U.S. Department of Justice, Office of Justice Programs, BureauofJusticeAssistancesolelyforthepurposeoffurtheringthestatedobjectivesoftheEdwardByrneMemorialJusticeAssistanceGrant (JAG) Program. The Subrecipient shallusethefundstoperformtasksasdescribedintheScopeofWorkportionofthisAgreement. 2. The Subrecipient acknowledges that because this Agreement involves federal funding, the period of performance described herein will likely begin prior to the City’s receiptofappropriatedfederalfunds. The Subrecipient agrees that it will not hold the City ortheDepartmentofJusticeliableforanydamages, claim for reimbursement, or any typeofpaymentwhatsoeverforservicesperformedunderthisAgreementpriortotheCity’sreceiptanddistributionoffederalfunds. 3. This contract is funded with federal grant funds under CFDA 16.738. The grant is FY2022JusticeAssistanceGrantProgramAward #15PBJA-22-GG-02095-JAGX. All federalfinancialandgrantmanagementrulesandregulationsmustbeadheredtointheexecutionofthiscontract. Exhibit Attachment A is a copy of the federal awarddocuments. All special conditions stated in the award documents apply to the executionofthiscontract. All Subrecipients are assumed to have read, understood, and acceptedtheAwardasbinding. 4. The Subrecipient acknowledges that all allocations and use of funds under thisagreementwillbeinaccordancewiththeEdwardByrneMemorialJusticeAssistanceGrant (JAG) Program: FY 2022 Local Solicitation. Allocation and use of grant fundingmustbecoordinatedwiththegoalsandobjectivesincludedintheLocalSolicitation. AllSubrecipientsareassumedtohaveread, understood, and accepted the LocalSolicitationasbinding.
AGENDA ITEM #8. q)
23-00258 Renton FY22 JAG MOU Contract Page 4 of 7
5. Subrecipient agrees to obtain a valid DUNS profile and create an active registration withtheCentralContractorRegistration (CCR) database no later than the due date of theSubrecipient’s first quarterly report after a subaward is made. 6. The Subrecipient shall comply with all applicable laws, regulations, and programguidance. The Uniform Administrative Requirements, Cost Principles, and AuditRequirementsin2C.F.R. Part 200, as adopted and supplemented by the Department ofJustice (DOJ) in 2 C.F.R Part 2800 (together, the “Part 200 Uniform Requirements”) apply to this 2020 award from the Office of Justice Programs (OJP). 7. The Subrecipient must comply with the most recent version of the AdministrativeRequirements, Cost Principals, and Audit Requirements. a. Non-Federal entities that expend $750,000 or more in one fiscal year in Federalawardsshallhaveasingleorprogram-specific audit conducted for that year inaccordancewiththeOfficeofManagementandBudget (OMB) Circular A-133-Audits of States, Local Governments, and non-Profit Organizations. Non-federalentitiesthatspendlessthan $750,000 a year in federal awards are exempt fromfederalauditrequirementsforthatyear, except as noted in Circular No. A-133, butrecordsmustbeavailableforrevieworauditbyappropriateofficialsoftheFederalagency, pass-through entity, and General Accounting Office (GAO). b. Subrecipients required to have an audit must ensure the audit is performed inaccordancewithGenerallyAcceptedAuditingStandards (GAAS), as found in theGovernmentAuditingStandards (the Revised Yellow Book) developed by theComptrollerGeneralandtheOMBComplianceSupplement. The Subrecipient hastheresponsibilityofnotifyingtheWashingtonStateAuditor’s Office andrequestinganaudit. c. The Subrecipient shall maintain auditable records and accounts so as to facilitatetheauditrequirementandshallensurethatanysub-recipients also maintainauditablerecords. d. The Subrecipient is responsible for any audit exceptions incurred by its ownorganizationorthatofitssubcontractors. Responses to any unresolvedmanagementfindingsanddisallowedorquestionedcostsshallbeincluded withtheauditreportsubmittedtotheSeattlePoliceDepartment. The Subrecipientmustrespondtorequestsforinformationorcorrectiveactionconcerningauditissuesorfindingswithin30daysofthedateofrequest. The City reserves the righttorecoverfromtheSubrecipientalldisallowedcostsresultingfromtheaudit. e. If applicable, once any single audit has been completed, the Subrecipient mustsendafullcopyoftheaudittotheCityandaletterstatingtherewerenofindings, or if there were findings, the letter should provide a list of the findings. TheSubrecipientmustsendtheauditandtheletternolaterthanninemonthsafter theendoftheSubrecipient’s fiscal year(s) to: Kathryn Finau, JAG Program ManagerSeattlePoliceDepartment
AGENDA ITEM #8. q)
23-00258 Renton FY22 JAG MOU Contract Page 5 of 7
610 5th AvenuePOBox34986Seattle, WA 98124-4986206-233-3722Kathryn.finau3@seattle.gov
f. In addition to sending a copy of the audit, the Subrecipient must include acorrectiveactionplanforanyauditfindingsandacopyofthemanagement letter ifonewasreceived. The Subrecipient shall include the above audit requirements inanysubcontracts. g. The Subrecipient agrees to cooperate with any assessments, national evaluationefforts, or information or data collection requirements, including, but not limitedto, the provision of any information required for assessment or evaluation ofactivitieswithinthisagreement, and for compliance BJA reporting requirements. h. Suspension and Debarment: The Subrecipient certifies that neither it nor itsprincipalsarepresentlydebarred, suspended, proposed for debarment, declaredineligible, or voluntarily excluded from participating in transactions by anyFederaldepartmentoragency. By signing and submitting this Agreement, theSubrecipientisprovidingthesignedcertificationsetoutbelow. The certificationthisclauseisamaterialrepresentationoffactuponwhichreliancewasplacedwhenthistransactionwasenteredinto. If it is later determined that the Subrecipient rendered an erroneous certification, the Federal Government and City may pursue available remedies, includingterminationand/or debarment. The Subrecipient shall provide immediate writtennoticetotheCityifatanytimetheSubrecipientlearnsthatitscertificationwaserroneouswhensubmittedorhasbecomeerroneousbyreasonofchangedcircumstances. The Subrecipient agrees by signing this Agreement that it shall not enter into anycoveredtransactionwithapersonorsubcontractorwhoisdebarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded fromparticipationinthiscoveredtransaction, unless authorized in writing by the City. The Subrecipient shall include the requirement in this section in any subcontracts.
ARTICLE IV: SCOPE OF WORKTheScopeofWorkofthisAgreement and the time schedule for completion of such work isasdescribedinAttachmentB: JAG Budget Worksheet, as approved by BJA. Attachment B isattachedtoandmadepartofthisagreement. The work shall, at all times, be subject to the City’s general review and approval. TheSubrecipientshallconferwiththeCityperiodicallyduringtheprogressoftheWork, andshallprepareandpresentsuchinformationandmaterials (e.g. a detailed outline ofcompletedwork) as may be pertinent, necessary, or requested by the City or BJA todeterminetheadequacyoftheWorkorSubrecipient’s progress.
AGENDA ITEM #8. q)
23-00258 Renton FY22 JAG MOU Contract Page 6 of 7
ARTICLE V: PAYMENT1. CompensationTheSubrecipient shall be reimbursed on an actual cost basis. Compensation under thisAgreementcannotexceed $33,532. The Subrecipient shall incur authorized allowable expenses in accordance with theProjectBudget, as detailed in Attachment B. The Subrecipient may request additional reimbursement up to the amount of interestaccruedontheirportionofthegrantaward. The City will provide quarterly statementstotheSubrecipient, once the interest balance accrued equals at least $1,000. Reimbursements will not be made for interest accrued that is less than $1,000. Reimbursements can be requested, up to the total amount of interest accrued, after theinitialquarterlystatementhasbeensent, to perform tasks in accordance with theProjectBudget, as detailed in Attachment B. No travel or subsistence costs, including lodging and meals, reimbursed with federalfundsmayexceedfederalmaximumrates, which can be found at: http://www.gsa.gov. 2. Manner of PaymentTheSubrecipientshall submit reimbursement requests not more than monthly, and atleastquarterly. After the first quarter, monthly submission is preferred. Requests are due no later than 30 days after the end of the period in which the workwasperformed. Reimbursement request forms are provided. Substitute forms areacceptable. With each reimbursement request, the Subrecipient shall submit: Detailed spreadsheet of expenditures by task and related financial documents (timesheets, invoices) These documents and invoices must be kept on file by the Subrecipient and be madeavailableuponrequestbytheCityortostateorfederalauditors, for at least sixyearsaftertheclosureofthegrant. Reimbursement will not be processed without accompanying documentation for thecorrespondingcosts. Once the above conditions are met, payment shall be made by theCitytotheSubrecipient. Submit invoicing to Submit Documentation toFiscalAccountsPayableSeattlePoliceDepartment6105thAvenuePOBox34986Seattle, WA 98124-4986SPDAP@seattle.gov
Kathryn Finau, JAG Program ManagerSeattlePoliceDepartment6105thAvenuePOBox34986Seattle, WA 98124-4986206-233-3722Kathryn.finau3@seattle.gov
AGENDA ITEM #8. q)
23-00258 Renton FY22 JAG MOU Contract Page 7 of 7
ARTICLE VI. COOPERATION IN MONITORING AND EVALUATION1. SPD Responsibilities: SPD shall monitor, evaluate and provide guidance and direction to Subrecipient in theconductofApprovedServicesperformedunderthisAgreement. SPD has theresponsibilitytodeterminewhetherSubrecipienthasspentfundsinaccordance withapplicablelaws, regulations, including the federal audit requirements and agreementsandshallmonitortheactivitiesofSubrecipienttoensurethatSubrecipienthasmetsuchrequirements. SPD may require Subrecipient to take corrective action ifdeficienciesarefound. SPD will not monitor Subrecipient’s adherence to SpecialConditions31-41 and 70 in the Grant Award and Special Conditions documents. 2. Subrecipient Responsibilities. a. Subrecipient shall permit SPD to carry out monitoring and evaluation activities, including any performance measurement system required by applicable law, regulation, funding sources guidelines or by the terms and conditions of theapplicableNoticeofPrimeAward, and Subrecipient agrees to ensure, to the greatestextentpossible, the cooperation of its agents, employees and board members insuchmonitoringandevaluationefforts. This provision shall survive the expirationorterminationofthisAgreement. b. Subrecipient shall cooperate fully with any reviews or audits of the activities underthisAgreementbyauthorizedrepresentativesofSPD, DOJ, the U.S. GovernmentAccountabilityOfficeortheComptrollerGeneraloftheUnitedStatesandSubrecipientagreestoensuretotheextentpossiblethecooperationofitsagents, employees and board members in any such reviews and audits. This provision shallsurvivetheexpirationorterminationofthisAgreement.
ARTICLE VII: AMENDMENTSNomodificationoramendment of the provisions hereof shall be effective unless in writingandsignedbyauthorizedrepresentativesofthepartieshereto. The parties heretoexpresslyreservetherighttomodifythisAgreement, by mutual agreement.
AGENDA ITEM #8. q)
Page 1 of 3
Memorandum of Understanding
FY 2023 Edward Byrne Memorial Justice Assistance Grant
July 7, 2023
This Memorandum of Understanding (MOU) outlines the responsibilities and protocols
for participating jurisdictions pertaining to the FY 2023 Edward Byrne Memorial Justice
Assistance Grant.
I. Participating Jurisdictions
The participating jurisdictions, relevant to this MOU, in the Edward Byrne Memorial
Justice Assistance Grant are:
• City of Seattle
• City of Auburn
• City of Bellevue
• City of Burien
• City of Des Moines
• City of Federal Way
• City of Kent
• King County
• City of Renton
• City of SeaTac
• City of Seattle
• City of Shoreline
• City of Kirkland
• City of Tukwila
II. Background and Purpose
Proposed to streamline justice funding and grant administration, the Edward Byrne
Memorial Justice Assistance Grant (JAG) Program allows states, tribes, and local
governments to support a broad range of activities to prevent and control crime based
on their own local needs and conditions. JAG blends previous Byrne Formula and Local
Law Enforcement Block Grant (LLEBG) Programs to provide agencies with the flexibility to
prioritize and place justice funds where they are most needed.
III. Disparate Certification
Jurisdictions certified as disparate must submit a joint application for the aggregate of
funds allocated to them, specifying the amount of funds that are to be distributed to
each of the units of local government and the purposes for which the funds will be used,
and indicating who will serve as the applicant/fiscal agent for the joint funds. The above
jurisdictions are certified as disparate.
AGENDA ITEM #8. q)
Page 2 of 3
IV. Fiscal Agent and Fund Allocation
The City of Seattle will act as the applicant and will serve as the fiscal agent for the joint
funds. The City of Seattle will charge a 3.7% administrative fee for these services.
The allocation of funding is as follows:
V. Project Allocations and Reporting
Participating jurisdictions are responsible for identifying their own projects for funding,
and for providing project information to the identified fiscal agent, the City of Seattle, for
purposes of submitting one joint application on behalf of all participating jurisdictions.
Upon receipt of award documents, and prior to expense of funds pertaining to the JAG
Program, the fiscal agent will enter into MOU Contract with all participating jurisdictions.
VI. Funds Remaining at End of Grant
If an agency has funds remaining that it will not spend and no extension is requested, all
parties agree that the funds will be re-obligated to Seattle within the final three months
of the grant. Notification between Seattle and the agency willing to forgo funds will
occur three months prior to the end of the period of performance.
Base Allocation
before 3.7%
Admin Fee
Minus 3.7% Grant
Admin Fee
PROPOSED FINAL
ALLOCATION AFTER
3.7% ADMIN FEE
KING COUNTY 285,151 10,551 274,600
AUBURN CITY 39,795 1,472 38,323
BELLEVUE CITY 19,861 735 19,126
BURIEN CITY 24,423 904 23,519
DES MOINES CITY 11,278 417 10,861
FEDERAL WAY CITY 44,608 1,650 42,958
KENT CITY 53,694 1,987 51,707
RENTON CITY 36,455 1,349 35,106
SEATAC CITY 15,624 578 15,046
SEATTLE CITY 348,519 - 369,622
KIRKLAND 10,703 396 10,307
SHORELINE 11,745 435 11,310
TUKWILA CITY 17,024 630 16,394
918,880$ 21,103$ 918,880$
PROPOSED FINAL ALLOCATIONS
AGENDA ITEM #8. q)
Page 3 of 3
Memorandum of Understanding
FY 2023 Edward Byrne Memorial Justice Assistance Grant
Signature Page
Jurisdiction:
Signature:
Name & Title:
Date:
Must be signed by Mayor, City Administrator or Executive
AGENDA ITEM #8. q)
AB - 3401
City Council Regular Meeting - 07 Aug 2023
SUBJECT/TITLE: Approval of Supplement No. 3 to CAG-20-083 with KPG Psomas Inc.
for SW 43rd Street Preservation Project
RECOMMENDED ACTION: Refer to Transportation (Aviation) Committee
DEPARTMENT: Public Works Transportation Systems Division
STAFF CONTACT: Emily Logan, Transportation Project Manager
EXT.: 7393
FISCAL IMPACT SUMMARY:
The Preliminary Engineering budget (317.122999.015.595.11.63.000) to date is $577,850. The total
expenditure to date is $42,461. The Preliminary Engineering budget balance is $535,388. There is sufficient
funds in the Preliminary Engineering budget to accommodate Supplement No. 3 in the amount of $484,647
with KPG Psomas. The summation of the Original Contract and Supplement 2 is $110,553. The new maximum
amount payable is $595,200.
SUMMARY OF ACTION:
This project will resurface SW 43rd Street from the western city limits to the SR 167 ramps, with the exception
of where there are existing concrete panels. The project will also upgrade intersection curb ramps disturbed by
resurfacing limits to public right-of-way accessibility guideline requirements and install and replace all traffic
delineation to city standards. Also included in the project are the adjustment and evaluation for replacement
of existing features affected by resurfacing such as monuments, catch basins or drainage grates. After the 10%
submittal review, it was determined to expand the Scope of Work to include King County Metro Safe Routes to
Transit projects #5 and #8 (pedestrian signal systems) located within the project limits and stormwater
improvements at Lind Ave SW intersection and throughout the corridor.
Supplement No. 3 includes final engineering design which consist of Plans, Specifications, and Cost Estimate
(PS&E) for final design and bid documents. Also included in Supplement No. 3 is stormwater analysis, pub lic
involvement, utility coordination, maximum extent feasible (MEF) documentation, and WSDOT coordination.
Additional services will include environmental documentation, construction engineering support services,
construction administrations services
EXHIBITS:
A. Agreement – Supplement No. 3
STAFF RECOMMENDATION:
Authorize the Mayor and City Clerk to execute Supplement No. 3 to CAG-20-083 with KPG Psomas Inc. in the
amount of $484,647 for final engineering design services for SW 43rd Street Preservation Project.
AGENDA ITEM #8. r)
DOT Form 140-063
Revised 09/2005
Supplemental Agreement
Number
Organization and Address
Phone:
Original Agreement Number
Project Number Execution Date Completion Date
Project Title New Maximum Amount Payable
Description of Work
The Local Agency of
desires to supplement the agreement entered in to with
and executed on and identified as Agreement No.
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
I
Section 1, SCOPE OF WORK, is hereby changed to read:
II
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days
for completion of the work to read:
III
Section V, PAYMENT, shall be amended as follows:
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate
spaces below and return to this office for final action.
By: By:
Consultant Signature Approving Authority Signature
Date
AGENDA ITEM #8. r)
City of Renton
SW 43rd Street Preservation
Final Design KPG Psomas Inc.
Project Number: 20015 1 June 2023
EXHIBIT A
CITY OF RENTON
SW 43rd STREET PRESERVATION PROJECT
FINAL DESIGN
SCOPE OF WORK
SUPPLEMENT 3
June 5, 2023
A. PROJECT BACKGROUND / DESCRIPTION
The City of Renton (“City”) will resurface approximately 6,000 LF of SW 43rd Street from
approximately 200 feet east of the Renton/Tukwila City boundary vicinity of the
Interurban Trail and BNSF crossing eastward across SR 167 to the Northbound SR 167
ramps intersection (including the intersection). This project will also upgrade all curb
ramps located at the intersections along the corridor.
For the purposes of this scope, following improvements were assumed:
· Grind and overlay SW 43rd St from the western City limits eastward to the NB SR
167 ramps, except where there are existing concrete panels
· Full depth pavement repair where alligator cracking is present (along SW 43rd St
from Renton/Tukwila City boundary eastward to the NB SR 167 ramps
intersection).
· Replacement of existing curb and gutter segments where severe deterioration
is observed (along SW 43rd St from Renton/Tukwila City boundary eastward to
the NB SR 167 ramps intersection).
· New curb ramps at the intersections of SW 43rd St/Oakesdale Ave SW, SW 43rd
St/Lind Ave SW, SW 43rd St/East Valley Hwy (all four corners, including the right
turn slip lane to island crossings on the NE and SW corners of the intersection),
and new curb ramps for SW 43rd St/NB SR 167 ramps intersection (all four
corners, including the right turn slip lane to island crossing on the SE corner of
the intersection).
· New channelization on SW 43rd St from the western City limits to east of the NB
SR 167 ramps intersection.
· Upgrade traffic loops with new video detection where disturbed by asphalt
grinding operations at the intersections of SW 43rd St & Oaksdale Ave SW, SW
43rd St & Lind Ave SW, SW 43rd St & East Valley Hwy, and SW 43rd St & the NB SR
167 ramps intersection.
AGENDA ITEM #8. r)
City of Renton
SW 43rd Street Preservation
Final Design KPG Psomas Inc.
Project Number: 20015 2 June 2023
· New pedestrian signal systems intersections of SW 43rd St & Oaksdale Ave SW,
SW 43rd St & Lind Ave SW, SW 43rd St & East Valley Hwy, and SW 43rd St & the
NB SR 167 ramps intersection.
· New storm system improvements consisting of 15 total new manholes: 4
manholes at the intersection of SW 43rd St & Lind Ave SW, and 11 manholes
along SW 43rd St between Lind Ave SW and Oaksdale Ave SW for lateral runs.
· A Preliminary Stormwater Technical Memorandum including an assessment of
Core Requirements will be provided at the conceptual (10%) level. A Full (90% &
100%) Stormwater Technical Information Report is not included in this scope of
work.
· Water manhole lids will be replaced with water valve covers
· No other utility upgrades are anticipated in the project design
This scope outlines the design effort, supplemental services, and coordination efforts
required to achieve the City’s Project goals. KPG Psomas Inc. (“Consultant”) will provide
the following services that will result in Bid ready Plans, Specifications, and Estimates:
· Preliminary Stormwater Analysis
· Coordination with Utilities and Stakeholders
· Final Design (90%, 100%) – Plans, Specifications, and Estimates
· WSDOT Bid Review Submittal
Design Phase 2 of this project was completed in March 2023. Items already completed
under Design Phase 1 include Survey and Basemapping, Right of Way Determination and
Geotechnical Pavement Investigation and Reporting. Items already completed under
Design Phase 2 include Preliminary Design (10%). It is anticipated that once the City has
reviewed and approved the Preliminary Design Submittal, this scope of services will be
amended to complete the Final Design effort.
The City was awarded a $1,000,000 Surface Transportation Program (STP) grant for
Pavement Preservation in 2018. In 2020, the federal STP funds were swapped with City
Funds in the Williams Ave S and Wells Ave S Conversion Project.
In a meeting with the City on February 22, 2023 City directed the Consultant to revise the
original project scope/limits to include the following City of Renton Safe Routes to Transit
(SRTT) projects: SW 43rd St and East Valley Hwy, SW 43rd St and NB SR 167 Ramps. Project
limits and improvements have been updated to reflect the addition of these Safe Routes
to Transit projects in this Supplement 3 scope. These two SRTT projects will be fully
integrated and assumed into the SW 43rd Street Preservation project name and work, no
separate documentation for SRTT project titles or SRTT project funding will be required
in the project plan set, cost estimate, or design memo.
AGENDA ITEM #8. r)
City of Renton
SW 43rd Street Preservation
Final Design KPG Psomas Inc.
Project Number: 20015 3 June 2023
In a meeting with the City on May 5, 2023 City directed the Consultant to revise the
original project scope to include new storm system utility improvements. City Surface
Water group will attempt to go after a TIB Grant in August 2023 to aid in the costs
associated with these stormwater improvements.
B. DESIGN CRITERIA
The following design criteria will adhere to:
City of Renton Municipal Code
City of Renton Standard Plans
Public Right-of-Way Accessibility Guidelines (PROWAG), July 26, 2011
WSDOT Design Manual, M 22-01, September 2022
WSDOT Pavement Policy, September 2018
WSDOT Standard Plans, M 21-01, September 2022
WSDOT 2023 Standard Specifications, M 41-10, 2023
Manual on Uniform Traffic Control Devices (MUTCD), 2009 Edition
King County Surface Water Design Manual (KCSWDM), 2021 Edition
C. ASSUMPTIONS
The following assumptions were identified to provide direction with design:
There is no design DBE Goal established for the PE Phase.
NEPA is not required for City funded project or in WSDOT limited access areas of the
project or with TIB funds for storm utility improvements.
The project is exempt from SEPA per WAC 197-11-800 (23)(b), assuming all new storm
utility improvements will be 12 inches or less in diameter.
It is anticipated The Project will not require environmental support services. If it is
determined later that environmental permitting documentation will be needed, the
Consultant can provide environmental support services to the City’s selected
environmental services consultant at an additional cost. This may include support with
technical reports, aerial maps, quantities, and figures.
The Project will not require ROW Acquisition Services. The Consultant will assist with
defining existing ROW in areas where curb ramps are to be reconstructed.
WSDOT MEF Documentation Approval will be required.
Structural engineering is not included in this scope of work.
AGENDA ITEM #8. r)
City of Renton
SW 43rd Street Preservation
Final Design KPG Psomas Inc.
Project Number: 20015 4 June 2023
D. KPG PSOMAS INC. DELIVERABLES
Deliverables prepared by the Consultant are identified at the end of each Work Element
(WE).
E. CITY OF RENTON PROVIDED ITEMS:
The City of Renton will be responsible for the following:
Submittal reviews, comments, and approvals (1 to 2 sets of comments per submittal)
Public notices, property owner mailings, postage, and host a project website
Meeting room arrangements
Right-of-entries for construction, if required
Environmental Permits
Traffic data and vehicle classification
Title Reports, if necessary
F. SCOPE OF WORK
WORK ELEMENT 6 – MANAGEMENT / COORDINATION / ADMINISTRATION
The Estimated project duration is 10 months.
6.1 The Consultant will provide continuous project management for the project’s
duration (estimate 10 months). The Consultant will prepare monthly progress
reports identifying work completed in the previous month, work in progress,
upcoming work elements, and reporting of any delays, problems, or additional
information needs. These reports will be submitted with the Consultant invoices.
6.2 Prepare for and attend bi-weekly design coordination meetings with City Staff and
other project stakeholders. These meetings are to be held at Renton City Hall or
via Video Conferencing (estimate 20 meetings total).
6.3 The Consultant will prepare and update a project schedule.
6.4 The Consultant will manage the project team and conduct regular project team
meetings (estimate 20 meetings total) with internal staff and subconsultants.
Work Element 6 Deliverables:
Monthly progress reports (10 months) – Delivered to the City Monthly
Project Schedule and Updates – Delivered to the City upon request
Meeting notes – Delivered to the City 3 business days after scheduled meeting
AGENDA ITEM #8. r)
City of Renton
SW 43rd Street Preservation
Final Design KPG Psomas Inc.
Project Number: 20015 5 June 2023
WORK ELEMENT 7 – ADDITIONAL SURVEY & BASEMAPPING
7.1 Review of survey basemap info and surfaces provided to Consultant from
Parametrix CAD files for the City of Renton Safe Routes to Transit (SRTT) projects:
SW 43rd St and East Valley Hwy, SW 43rd St and NB SR 167 Ramps. Conversion of
CAD files and linetypes styles for compatibility and use in the SW 43rd Street
Preservation project plans. Control points and existing roadway rights of way
(ROW) within the additional project limits will be reviewed for consistency and
compatibility for use in the project plans.
7.2 Additional field survey within the SRTT projects limits not already completed with
Design Phase 1 original scope of work:
· Additional field survey of planimetric features and utilities. Topographic mapping
of the existing ground will be taken at the following intersections where curb
ramps are to be reconstructed:
o SW 43rd St/East Valley Hwy
o SW 43rd St/NB SR 167 Ramps
· This WE will include locating signal loops. Perform observation and measure-
downs of existing storm drain catch basins and manholes and sewer manholes
within the intersection requiring a full survey (not already included in the
Parametrix CAD SRTT basemap provided). The approximate size, type (brick,
concrete), and general condition of the structures to confirm suitability for
adjustment.
7.3 Updating basemap to incorporate additional field survey for expanded project
limits.
Work Element 7 Deliverables:
Electronic copies of the updated basemap – Delivered to the City within 2 months after
the Notice to Proceed date
WORK ELEMENT 8 – PRELIMINARY STORMWATER ANALYSIS
This WE covers the necessary effort required to perform a preliminary stormwater
analysis to assess core requirement applicability at the conceptual (10%) level.
8.1 The Consultant shall prepare a Preliminary Stormwater Technical Memorandum
including a delineation of project limits, Threshold Discharge Area(s), and
existing/proposed hydrology, as well as a calculation of new/replaced impervious
AGENDA ITEM #8. r)
City of Renton
SW 43rd Street Preservation
Final Design KPG Psomas Inc.
Project Number: 20015 6 June 2023
surfaces and subsequent Core Requirements assessment.
Work Element 8 Deliverables:
Electronic pdf copy of the Preliminary Stormwater Technical Memorandum
Work Element 8 Assumptions:
Per conversations with the City, a Full Stormwater Technical Information Report (TIR)
is not anticipated to be required as thresholds for Flow Control and Water Quality
Treatment facilities are not anticipated to be exceeded. If preliminary stormwater
analysis indicates that Flow Control and/or Water Quality Treatment facilities are
required, then a Full TIR may be necessary at additional cost.
WORK ELEMENT 9 – PUBLIC INVOLVEMENT
This WE covers the effort required to support the City led public involvement process
during the development of the project. The goal of this effort is to obtain input from
project stakeholders, including business/property owners located within the project
limits.
9.1 The Consultant will assist the City in the preparation of website graphics and up
to two (2) project fliers to be distributed to the public.
Work Element 9 Deliverables:
Website Graphics and Project Fliers (2), Electronic PDF and JPEG’s – Delivered to the
City upon completion
Work Element 9 Assumptions:
City will host, maintain, and update the project website.
WORK ELEMENT 10 – UTILITY COORDINATION FINAL DESIGN
The Consultant will coordinate with private utilities affected by the proposed
improvements. Efforts included under this WE are as follows:
10.1 Prepare letters with updated design plans to send to purveyors at each submittal
phase.
10.2 Update Utility Conflict Plan: This plan will be submitted to all purveyors with
utilities in the project limits to assess whether said utilities may conflict with the
proposed improvements.
10.3 Potholing services will be used to identify potential utility conflicts (33 estimated).
The locations of the potholes will be surveyed and added to the basemap (WE 2).
AGENDA ITEM #8. r)
City of Renton
SW 43rd Street Preservation
Final Design KPG Psomas Inc.
Project Number: 20015 7 June 2023
The Consultant will collect and analyze the pothole data necessary to develop the
Utility Conflict Plan (WE 10.2).
Work Element 10 Deliverables:
Letters to Utility Purveyors – Delivered to the City upon request
Utility Conflict Figure (11x17) – Delivered to the City upon completion
Updated basemap showing utility potholes
WORK ELEMENT 11 – FINAL DESIGN (90, 100%)
The Consultant shall prepare 90% and 100% Plans, Specifications and Estimates for review
and approval by the City. Plans shall be formatted to provide enough detail for
convenient field layout of all proposed facilities. City Standard Details and WSDOT
standard plans will be supplemented with project specific details as required. All design
plans and documents will be signed by a licensed professional engineer in the State of
Washington.
11.1 The consultant shall prepare 90% plans for review and approval by the City. The
90% submittal will include all comments received from the Preliminary Design
(10%) project meetings.
11.2 The consultant shall prepare 100% plans for review and approval by the City. The
100% submittal will include all comments received from the 90% review.
11.3 Consultant will calculate quantities and prepare construction cost estimates in
support of the 90% and 100% submittals.
11.4 Consultant will prepare specifications based on 2023 WSDOT Standard
Specifications, using contract boilerplate, federal funding requirements, and
general special provisions provided by the City for the 90% and 100% submittals.
11.5 The Consultant will provide internal quality assurance/quality control (QA/QC)
reviews of all major deliverables prior to submittal to the City.
Work Element 11 Deliverables:
Five (5) ½-size bound of the 90% Design Plans and PDF – Delivered to the City on the
90% Submittal date
Five (5) ½-size bound of the 100% Design Plans and PDF – Delivered to City on the 100%
Submittal date
One (1) hard copy, and two (2) electronic versions (PDF and Excel) of the 90% and 100%
Engineer’s Estimate – Delivered to the City with each submittal at 90%, 100%.
Five (5) hard copies, and electronic versions (PDF) of the 90% and 100% Specifications
– Delivered to the City with each submittal at 90%, 100%.
AGENDA ITEM #8. r)
City of Renton
SW 43rd Street Preservation
Final Design KPG Psomas Inc.
Project Number: 20015 8 June 2023
QA/QC Checklist (Signed and Initialed) – Delivered to the City with each submittal at
90%, 100%.
Work Element 11 Assumptions:
Consultant will utilize existing and proposed information provided by the City from the
City of Renton Safe Routes to Transit (SRTT) projects: SW 43rd St and East Valley Hwy,
SW 43rd St and NB SR 167 Ramps as preliminary design information.
Project will be bid as one project and one bid package, SRTT project work will not be
separated out. City assumes no funding sources tied to the SRTT project work moving
forward with final design. Storm utility improvements will be a separate schedule on
the cost estimate. City assumed possible TIB funding sources tied to storm utility
improvement work moving forward with design.
Design provided by Parametrix will be utilized as a guide only to develop the
Consultant’s final design for this project.
One project cover page and plan set will be assumed for the project, no separate
documentation for SRTT project work or storm utility improvements will be completed.
One cost estimate will be assumed for the project, SRTT work will not be separated out
in the cost estimate. Schedule of prices for storm utility improvements will be
separated out in the cost estimate. Schedule of prices can be separated out for any
other separate franchise utilities or WSDOT limited access work requiring separate
taxing on items.
One project specification package is assumed for the project, SRTT work and storm
utility improvements will not be separated out.
WORK ELEMENT 12 – WSDOT CHANNELIZATION PLAN REVIEW AND BID DOCUMENTS
The Consultant shall provide WSDOT Maximum extent feasible (MEF) Plan Review and
approval by WSDOT for the NB SR 167 ramps intersection. WSDOT MEF Plan will be
stamped, signed and dated by a licensed professional engineer in the State of
Washington.
12.1 The Consultant shall coordinate with WSDOT and prepare WSDOT MEF plans that
meet current WSDOT documentation requirements (NB SR 167 ADA Ramp
intersection only), and design vehicle turning movement analysis. It is anticipated
that WSDOT channelization plans and Basis of Design report will not be required
for documentation based on City’s previous correspondence with WSDOT for the
SRTT projects. It is estimated an approval will require (3) submittals of the WSDOT
MEF plans.
12.2 Prepare and submit Maximum Extent Feasible (MEF) documentation in
accordance with City of Renton requirements for ADA ramps outside of the NB SR
167 ramp intersection. (NB SR 167 ADA ramp intersection documentation will be
completed with WSDOT Chan plan submittal WE 12.1
).
AGENDA ITEM #8. r)
City of Renton
SW 43rd Street Preservation
Final Design KPG Psomas Inc.
Project Number: 20015 9 June 2023
12.3 Prepare and submit a WSDOT Traffic Control Plan (TCP) at 90% Submittal for the
NB SR 167 ramp intersection. (2 sheets – 20 scale)
12.4 The Consultant shall prepare Bid Documents (Plans, Specifications and Cost
Estimate) for advertisement by the City. Consultant will also assist the City during
the bidding process in answering questions by the Contractors, or in providing
information for an addendum (assume 2), as requested by the City. Consultant will
also prepare conformed documents.
The estimated sheet count is the following:
Sheet List
Cover sheet (1 sheet)
Sheet Index, Survey Control & Alignment Data (1 sheet)
Legend and Abbreviations (1 sheet)
Traffic Control Plans (11 sheets)
Roadway Typical Sections (1 sheets)
Roadway Details (1 sheets)
Site Preparation Plans (8 sheets)
Roadway Plans (8 sheets)
Storm Plans and Profiles (8 sheets)
Storm Details (2 sheets)
Curb Ramp Details (10 sheets)
Traffic Signal Plans and Notes (8 sheets)
Channelization and Signing Plans (8 sheets)
TOTAL = 68 sheets
Work Element 12 Deliverables:
PDF of WSDOT MEF Plans and supporting documentation – Delivered to the City 1
month after WSDOT’s final MEF Plan approval.
City MEF Documentation – Delivered to the City 1 month after the 100% review
comments are received
Five (5) ½-size bound of the Bid Plans and PDF – Delivered to the City within 1 month
after the 100% review comments are received
One (1) hard copy, and two (2) electronic versions (PDF and Excel) of the Bid Engineer’s
Estimate – Delivered to the City within 1 month after the 100% review comments are
received
Five (5) hard copies, and electronic versions (PDF) of the Bid Specifications – Delivered
to the City within 1 month after the 100% review comments are received
Addenda (assume up to 2) and Answers to Questions During Bidding
Work Element 12 Assumptions:
The City will provide the Consultant with copies of approved City MEF documentation
format.
AGENDA ITEM #8. r)
City of Renton
SW 43rd Street Preservation
Final Design KPG Psomas Inc.
Project Number: 20015 10 June 2023
ICE (Intersection Control Evaluation) report and Signal Warrant Analysis for NB SR 167
ramps intersection assumed not required as part of WSDOT MEF approval
documentation.
Project will be bid as one project and one bid package, SRTT project work and storm
utility improvement work will not be separated out. City assumes no funding sources
tied to the SRTT project work moving forward with final design. City assumes possible
TIB funding sources tied to storm utility improvement work moving forward with
design.
WORK ELEMENT 13 – ADDITIONAL PRELIMINARY DESIGN (10%)
This WE covers the additional effort required to incorporate the City of Renton Safe
Routes to Transit (SRTT) projects: SW 43rd St and East Valley Hwy, SW 43rd St and NB SR
167 Ramps project work into the current SW 43rd Street Preservation project Preliminary
Design (10%) submittal.
13.1 The Consultant shall incorporate the SRTT project work into the 10% submittal
documents. This includes incorporation into the preliminary design scroll plot,
option of cost, and design report memo. Consultant shall review CAD drawings
and surface information provided to Consultant from Parametrix CAD files for the
SRTT projects. Conversion of CAD files and linetypes styles for compatibility and
use in the SW 43rd Street Preservation project will be completed. The 2 additional
intersections (SW 43rd St and East Valley Hwy, SW 43rd St and NB SR 167 Ramps)
will be analyzed and incorporated into the preliminary design report memo and
10% preliminary option of cost.
Work Element 13 Deliverables:
10% submittal will include SRTT project work incorporated into the PDF of the
Preliminary Design Roll Plot, (PDF and Excel) Preliminary Design Option of Cost, PDF of
the Design Report Memo – delivered to the City at the 10% submittal date
Work Element 13 Assumptions:
Consultant will utilize existing and proposed information provided by the City from the
City of Renton Safe Routes to Transit (SRTT) projects: SW 43rd St and East Valley Hwy,
SW 43rd St and NB SR 167 Ramps as preliminary design information. Consultant will
assume final design of SRTT projects into the SW 43rd Street Pavement Preservation
project and prepare for bid.
ADDITIONAL SERVICES
The City may require additional services of the Consultant. The scope of these services
will be determined based on the unanticipated project needs or other considerations at
the sole discretion of the City. This work may include items identified in the current WE
AGENDA ITEM #8. r)
City of Renton
SW 43rd Street Preservation
Final Design KPG Psomas Inc.
Project Number: 20015 11 June 2023
authorizations as well other items, which may include, but are not necessarily limited to
the following:
· Separated bid packages for SRTT project work, storm utility improvement work,
or separate funding sources
· City Utility Design Services
· Environmental Support Services
· Full Stormwater Technical Information Report (TIR) (if later required)
· Providing Construction Engineering Support Services
· Providing Construction Administration Services
· ROW Acquisition Services
These services will be authorized under a future contract supplement if necessary. At the
time these services are required, the Consultant shall provide a detailed scope of work
and an estimate of costs. The Consultant shall not proceed with the work until the City
has authorized the work and issued a notice to proceed.
AGENDA ITEM #8. r)
EXHIBIT B
PRIME CONSULTANT COST COMPUTATIONS - Supplement 3 (Final Design)
City of Renton
SW 43rd Street Preservation Project
KPG Psomas Inc. Project Number:20015
Date: 6/5/2023
Engineering ManagerSenior EngineerSenior Project EngineerProject Engineer IIIProject Engineer IIProject Engineer IDesign Engineer IIDesign Engineer IEngineering TechnicianSurvey Crew II (W/Equip)Survey Crew I (W/Equip)Project SurveyorSurveyor IIIConstruction ManagerSenior CAD TechnicianCAD TechnicianBusiness ManagerSenior AdminOffice AdminOffice AssistantNegotiated Hourly Rate $251.00 $215.00 $203.00 $188.00 $175.00 $149.00 $140.00 $133.00 $114.00 $260.00 $205.00 $164.00 $137.00 $185.00 $138.00 $124.00 $178.00 $133.00 $103.00 $82.00 Hours Totals
6.1 Administration, Coordination, Supervision, Invoicing (10 months)5 5 12 10 20 52 7,736.00$
6.2 Meetings with City Staff (20 meetings) 5 5 20 30 6,390.00$
6.3 Prepare and Update Schedule 2 12 14 2,866.00$
6.4 Management of Team and Internal Meetings (20 meetings) 5 10 20 10 2 47 9,141.00$
15 22 64 0 0 0 10 0 0 0 0 0 0 0 2 0 0 10 0 20 143 26,133.00$
7.1 Review, Compatibility of SRTT Project Survey Data 2 16 18 3,126.00$
7.2 Additional Survey 4 12 12 16 44 9,208.00$
7.3 Update Basemap 2 16 16 34 5,318.00$
8 0 0 0 0 0 0 0 0 12 12 48 16 0 0 0 0 0 0 0 96 17,652.00$
8.1 Preliminary Stormwater Technical Memorandum 2 32 34 5,198.00$
0 2 0 0 0 32 0 0 0 0 0 0 0 0 0 0 0 0 0 0 34 5,198.00$
9.1 Website Graphics and Fliers (2 Fliers)16 18 24 58 8,960.00$
0 0 16 0 0 0 18 24 0 0 0 0 0 0 0 0 0 0 0 0 58 8,960.00$
10.1 Utility Letters 4 12 16 2,492.00$
10.2 Utility Conflict Plan 4 12 46 62 8,610.00$
10.3 Potholing Services 4 16 20 3,052.00$
0 0 12 0 0 0 40 46 0 0 0 0 0 0 0 0 0 0 0 0 98 14,154.00$
11.1a 90% Plans Submittal - Engineering Design 4 20 130 8 100 140 180 20 40 4 646 99,102.00$
11.1b 90% Plans Submittal - Signal Design 45 55 8 108 17,902.00$
11.1c 90% Plans Submittal - Storm Design 4 20 120 140 284 42,784.00$
11.2a 100% Plans Submittal - Engineering Design 4 55 8 30 60 85 30 20 4 296 43,972.00$
11.2b 100% Plans Submittal - Signal Design 25 40 8 73 11,607.00$
11.2c 100% Plans Submittal - Storm Design 4 12 40 60 116 17,944.00$
11.3a Quantities and Cost Estimates (90%, 100%) - Engineering Design 4 30 8 25 45 12 124 19,139.00$
11.3b Quantities and Cost Estimates (90%, 100%) - Signal Design 10 16 8 34 5,190.00$
11.3c Quantities and Cost Estimates (90%, 100%) - Storm Design 2 4 8 16 30 4,794.00$
11.4a Specifications (90%, 100%) - Engineering Design 4 50 30 2 86 15,308.00$
11.4b Specifications (90%, 100%) - Signal Design 20 12 32 5,896.00$
11.4c Specifications (90%, 100%) - Storm Design 4 12 32 48 8,352.00$
11.5 QAQC 6 32 32 16 16 8 16 32 8 24 190 33,730.00$
36 200 297 16 32 346 457 465 94 0 0 0 0 24 0 60 0 30 0 10 2067 325,720.00$
12.1 WSDOT MEF Documentation - NB SR167 Intersection 4 22 45 20 10 101 14,831.00$
12.2 City Maximum Extent Feasible (MEF) Documentation 8 12 45 20 85 12,421.00$
12.3 WSDOT TC Plan - NB SR167 Intersection 8 16 16 8 48 6,568.00$
12.4 Assistance During Bidding 2 8 12 8 8 8 46 7,698.00$
2 20 54 0 0 0 0 114 64 0 0 0 0 0 0 18 0 8 0 0 280 41,518.00$
13.1 Preliminiary Design (10%) Roll plot, Option of Cost, Design Memo 10 12 14 24 16 76 11,562.00$
0 10 12 0 0 0 14 24 16 0 0 0 0 0 0 0 0 0 0 0 76 11,562.00$
61 242 443 16 32 346 525 649 158 12 12 48 16 24 2 78 0 48 0 30 2,818 450,897.00$
Potholing (33 @ $1000 each estimate) 33,000.00$
Subtotal 33,000.00$
33,000.00$
Mileage at current IRS rate 750.00$
Reproduction Allowance
750.00$
484,647.00$
Client:
Project Name:
Task Total
Task
No.
WE 9 - Public Involvement
Task Total
WE 10 - Utility Coordination Final Design
Labor Hour Estimate
Total Hours and Labor
Cost Computions by Task
WE 6 - Management/Coordination/Administration
Task Total
Task Description
WE 7 - Additional Survey & Basemapping
Task Total
Total Estimated Budget
Total Labor Hours and Fee
Subconsultants
WE 11 - Final Design (90%, 100%)
Task Total
Total Subconsultant Expense
Reimbursable Direct Non-Salary Costs
Total Reimbursable Expense
WE 12 - WSDOT Review and Bid Documents
Task Total
WE 13 - Additional Preliminary Design (10%)
Task Total
WE 8 - Preliminary Stormwater Analysis
Task Total
AGENDA ITEM #8. r)
Est Direct Salary
Office Overhead
@173.37% Fee @ 30% of DL 2023 Inclusive Rate
1.7337 30%
Classification Low Hi Costs (DSC) Of DSC of DSC (Rounded to $1)
Principal 89 99 93.91 162.81 28.17 285
Engineering Manager 79 87 82.73 143.43 24.82 251
Senior Engineer 67 75 71.00 123.09 21.30 215
Senior Project Engineer 64 70 67.00 116.16 20.10 203
Project Engineer I 47 51 49.00 84.95 14.70 149
Project Engineer II 55 61 57.75 100.12 17.33 175
Project Engineer III 59 65 62.00 107.49 18.60 188
Design Engineer I 42 46 44.00 76.28 13.20 133
Design Engineer II 44 48 46.00 79.75 13.80 140
Engineering Technician 36 40 37.69 65.34 11.31 114
Technician 32 35 33.60 58.26 10.08 102
Engineering Assistant 29 32 30.23 52.40 9.07 92
Senior Project Manager Survey 79 87 82.73 143.43 24.82 251
Survey Crew I (w/Equip)64 71 67.50 117.02 20.25 205
Survey Crew II (w/Equip)81 90 85.78 148.72 25.73 260
Field Surveyor I 29 32 30.25 52.44 9.08 92
Field Surveyor II 38 42 40.25 69.78 12.08 122
Field Surveyor III 45 50 47.75 82.78 14.33 145
Survey Assistant 29 32 30.25 52.44 9.08 92
Project Surveyor 51 57 54.00 93.62 16.20 164
Surveyor I 29 32 30.00 52.01 9.00 91
Surveyor II 38 42 40.00 69.35 12.00 121
Surveyor III 43 47 45.00 78.02 13.50 137
Urban Design Manager 63 69 66.02 114.46 19.81 200
Project Landscape Architect 48 54 51.00 88.42 15.30 155
Landscape Technician 32 35 33.48 58.04 10.04 102
Landscape Assistant 28 31 29.81 51.68 8.94 90
Senior Transportation Planner 59 66 62.50 108.36 18.75 190
Transportation Planner 36 39 37.54 65.08 11.26 114
Environmental Manager 72 74 72.12 125.03 21.64 219
Senior Environmental Planner I 58 61 60.00 104.02 18.00 182
Senior Environmental Planner II 77 83 81.00 140.43 24.30 246
Managing Biologist I 58 61 60.00 104.02 18.00 182
Managing Biologist II 65 68 67.00 116.16 20.10 203
Managing Biologist III 74 77 76.00 131.76 22.80 231
Senior Archaeologist 55 58 55.46 96.15 16.64 168
GIS Manager 52 55 52.89 91.70 15.87 160
Senior Biologist I 44 47 45.00 78.02 13.50 137
Senior Biologist II 51 54 52.00 90.15 15.60 158
Word Processor 39 42 39.18 67.93 11.75 119
Biologist I 25 28 26.00 45.08 7.80 79
Biologist II 33 37 35.00 60.68 10.50 106
Biologist III 40 43 42.00 72.82 12.60 127
Environmental Planner 50 53 52.00 90.15 15.60 158
Editor 29 33 29.99 51.99 9.00 91
GIS Tech 28 31 28.85 50.02 8.66 88
Cultural Resource Specialist 23 28 27.00 46.81 8.10 82
Senior Construction Manager 77 85 80.76 140.01 24.23 245
Construction Manager 58 64 61.00 105.76 18.30 185
Senior Resident Engineer 54 60 56.75 98.39 17.03 172
Resident Engineer 48 54 51.00 88.42 15.30 155
Assistant Resident Engineer 45 50 47.60 82.52 14.28 144
Senior Construction Observer 60 66 63.00 109.22 18.90 191
Construction Observer I 33 37 35.00 60.68 10.50 106
Construction Observer II 41 45 43.00 74.55 12.90 130
Construction Observer III 44 50 47.00 81.48 14.10 143
Construction Technician 29 32 30.23 52.40 9.07 92
Document Control Specialist I 38 42 40.00 69.35 12.00 121
Document Control Specialist II 45 49 47.00 81.48 14.10 143
Document Control Admin 33 36 34.32 59.50 10.30 104
Construction Assistant 24 26 24.96 43.27 7.49 76
CAD Manager 56 62 59.39 102.97 17.82 180
Senior CAD Technician 43 48 45.34 78.61 13.60 138
CAD Technician 39 43 41.00 71.08 12.30 124
Business Manager 56 61 58.52 101.46 17.56 178
Senior Admin 42 46 44.00 76.28 13.20 133
Office Admin 32 36 34.00 58.95 10.20 103
Office Assistant 26 28 27.04 46.88 8.11 82
Subs billed at cost plus 5%.
Reimbursables billed at actual costs.
Mileage billed at the current approved IRS mileage rate.
KPG Psomas Inc.
Summary of Negotiated Costs
Effective January 1, 2023 through December 31, 2023
Estimated Salary Range
AGENDA ITEM #8. r)
CITY OF RENTON, WASHINGTON
RESOLUTION NO. _______
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, UPDATING AND
EXTENDING RENTON’S SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
FOR 2024-2029.
WHEREAS, the City of Renton had adopted a Six-Year Transportation Improvement
Program (“TIP”) pursuant to RCW 35.77.010 (Perpetual advanced six-year plans for coordinated
transportation program expenditures); and the TIP has been updated, amended, and modified
from time to time as authorized and required by law; and
WHEREAS, the City Council held a duly noticed public hearing on August 7, 2023, for the
purpose of considering updates to the TIP; and
WHEREAS, the City Council has reviewed the work accomplished under the TIP,
considered any public testimony given at the public hearing held on August 7, 2023, considered
proposed updates to the TIP, and determined current City transportation needs;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO
RESOLVE AS FOLLOWS:
SECTION I. The City of Renton’s 2024-2029 Six-Year Transportation Improvement
Program, attached as Exhibit A and fully incorporated herein by this reference, is adopted as the
City’s updated and extended TIP.
SECTION II. The updated and extended TIP, as attached, shall be and constitute
Renton’s 2024-2029 Six-Year Transportation Improvement Program for purposes of compliance
with RCW 35.77.010, and shall remain in full force and effect until further revised, amended, and
modified as provided by law.
AGENDA ITEM # 10. a)
RESOLUTION NO. _______
2
SECTION III. The Administrator of the Public Works Department and the City Clerk are
authorized and directed to file this resolution, together with Exhibit A, with the Washington State
Secretary of Transportation within 30 days of its adoption.
PASSED BY THE CITY COUNCIL this 7th day of August, 2023.
___________________________
Jason A. Seth, City Clerk
APPROVED BY THE MAYOR this 7th day of August, 2023.
___________________________
Armondo Pavone, Mayor
Approved as to form:
___________________________
Shane Moloney, City Attorney
RES- PW:1946:6/28/23
AGENDA ITEM # 10. a)
EXHIBIT A
2024 – 2029
TRANSPORTATION IMPROVEMENT
PROGRAM
AGENDA ITEM # 10. a)
Transportation Improvement Program
2024—2029 | Six-Year Adopted
“DRAFT”
Department of Public Works
Transportation Systems Division
AGENDA ITEM # 10. a)
Acknowledgements
Mayor
Armondo Pavone
City Council
Valerie O’Halloran, Council President
Ed Prince
James Alberson, Jr.
Ryan McIrvin
Ruth Pérez
Carmen Rivera
Kim-Khánh Văn
Chief Administrative Officer
Ed VanValey
Public Works
Martin Pastucha, Public Works Administrator
Jim Seitz, Transportation Systems Director
Ellen Talbo, Transportation Planning and Programming Manager
Bob Hanson, Transportation Design Manager
Chris Barnes, Transportation Operations Manager
Eric Cutshall, Transportation Maintenance Manager
Heather Gregersen, Program Development Coordinator
2024 – 2029 Transportation Improvement Program
1
AGENDA ITEM # 10. a)
It is the City's policy to assure full compliance with Title VI of the Civil Rights Act of 1964, the
Civil Rights Restoration Act of 1987, and related statutes and regulations in all programs and
activities. Title VI requires that no person shall, on the grounds of race, color, sex, or national
origin be excluded from the participation in, be denied the benefits of, or be otherwise
subjected to discrimination under any Federal Aid Highway program or other activity for which
the City of Renton receives Federal financial assistance.
Any person who believes they have been aggrieved by an unlawful discriminatory practice under
Title VI has a right to file a formal complaint with the City of Renton. Any such complaint must
be in writing and filed with the City of Renton Human Resources within one hundred, eighty
(180) days following the date of the alleged discriminatory occurrence. Title VI Discrimination
Complaint Forms may be obtained from the City's website (www.rentonwa.gov) or from the
Human Resources office at no cost to the complainant by calling (425) 430-7655.
如果您需要此信息翻譯成中文 請電郵 ada@rentonwa.gov.
Si necesita traducir esta información al español, correo electrónico ada@rentonwa.gov.
Nếu quý vị cần thông tin này chuyển ngữ sang tiếng Việt xin gửi đến hòm thư điện tử
ada@rentonwa.gov.
Title VI Declaration
To Request Translated Materials
2
AGENDA ITEM # 10. a)
Table of Contents
Section A – Introduction
Purpose of the Transportation Improvement Program 5
Section B – Projects Map and Index Location
Map Index 10
Transportation Improvement Program Map 11
Section C – Development and Prioritization
TIP Development 13
City Business Plan 16
Expenditures and Revenues 17
Summary of Projects and Prioritization 18
Section D – Program/Project Descriptions
Individual Program/Project Pages 25
Section E – Appendix
Abbreviations and Acronyms
Resolution to Adopt Six-Year 2024-2029 TIP
2024 – 2029 Transportation Improvement Program
3
AGENDA ITEM # 10. a)
Section A
Introduction
2024 – 2029 Transportation Improvement Program
4
AGENDA ITEM # 10. a)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
Purpose of the Transportation Improvement Program
This document is Renton’s comprehensive transportation program for the ensuing six calendar years and is
mandated by the Revised Code of Washington and Washington Administrative Code. The Transportation
Improvement Program (TIP) is a multi-year planning tool that updates the future plans for transportation
projects and programs within the City that:
•support the mission and vision of the Renton Business Plan
•include new or enhanced bicycle or pedestrian facilities
or other applicable changes that promote non-motorized transit
•reflect the involvement of the public and the City’s elected officials
This document enables the Mayor and the City Council to review work that has been accomplished as well as
current and future transportation needs. The TIP is a planning document that identifies transportation-
related projects which are, or may become, eligible for federal, state and/or local funding. Local projects
must be included in the TIP in order to be eligible for state and federal grant programs.
TRANSPORTATION
IMPROVEMENT
PROGRAM
COMPREHENSIVE PLAN
Land Use Vision
COMMUNITY PLANS
City Center Community Plan
Benson Hill Community Plan
Sunset Area Community
Investment Strategy
Downtown Civic Core Vision
and Action Plan
Renton Trails and Bicycle
Master Plan
PROGRAM INPUT
Maintenance and
Operations
Walkway and Safety
Bridge and Guardrail
Project Development/
Planning
STATE & REGIONAL
TRANSPORTATION
IMPROVEMENT
PROGRAM
(STIP/RTIP)
Mandated by law
Capital Investment
Program (CIP)
Funded Priorities
Projects in the City to be
built to City standards/
plans By Others
Other Regional Projects in
which the City may wish
to Participate
5
AGENDA ITEM # 10. a)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
Changes from previous TIP
NEW TRANSPORTATION FUNDING/ADVANCED FUNDING
Transportation received funding in the State Transportation Budget in 2023 for the Grady Way & Rainier Ave
Intersection Improvements project and worked diligently to advance future funds for the Sunset Trail project
in order to help meet the Region’s annual delivery targets. Details are noted in the specific project sheets.
Current City efforts continue to be focused on delivering existing grant-funded projects through their
completion and preparing for delivering new pavement and sidewalk projects utilizing potential
transportation benefit district funds. The City will need to continue identifying revenues to contribute toward
local match amounts to continue to be competitive in future grant opportunities.
PROJECTS/PROGRAMS ADDED
• South 116th Sidewalk Project (TIP #23-04.1)
• Traffic Calming Program (TIP #23-07.2)
• Maplewood Sidewalk Rehabilitation (TIP #23-10.1)
• Sunset Trail (TIP #23-16.1)
PROJECTS COMPLETED/REMOVED:
• Safer Access to Neighborhood Destinations (SAND) (TIP #22-15)
• Bronson Way Bridge—Seismic Retrofit and Painting (TIP #22-16)
• Duvall Ave NE Roadway Improvements (TIP #22-17)
• Lake Washington Loop Trail Phase 5 (TIP #22-19)
PROJECTS UNDER CONSTRUCTION:
• Park Ave North Extension (TIP #23-17)
• Rainier Ave Corridor Improvements—Phase 4 (TIP #23-18)
Project Title Funding Phase Amount Fiscal Year
Grady Way & Rainier Ave Intersection
Improvements State Planning $ 750,000 2023
TOTAL $ 750,000
6
AGENDA ITEM # 10. a)
7
AGENDA ITEM # 10. a)
Section B
Projects Map and Index
2024 – 2029 Transportation Improvement Program
8
AGENDA ITEM # 10. a)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
Project Numbering and Map
This section explains the annual TIP number system. All TIP numbers start with the year the TIP document is
adopted then followed by a “-” (dash). The TIP project numbering system starts with programmatic activities
that typically have annual financial allocations. With this in mind, the TIP numbers for these programs
often remain the same for future TIPs and are at the beginning of the list since they are often citywide.
The next grouping of projects in alphabetical order are projects with full or partial funding secured, such as
with federal or state grants or developer contributions, or where the City has a financial commitment to
implementing within the six-year period.
The last group of projects, where the projects start over in alphabetical order, are unfunded local projects.
The final grouping are mostly outside agency-led projects, that have been identified in other long-range
plans for the City.
The following map shows the projects in the 2024 - 2029 Transportation Improvement Program (TIP), listed
by TIP number after the prefix “23-___”. City-wide projects or programs are challenging to display on a map
and are not shown.
9
AGENDA ITEM # 10. a)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
MAP INDEX
Programs are not shown on map.
TIP #23-07.1 Safe Routes to Transit
project locations have been
identified separately due to the
potential of becoming discrete TIP/
CIP projects in the future.
Individual project locations include:
S 43rd St/S Carr Road & Talbot Rd S
S Puget Dr/Royal Hills Dr SE/116th
Main Ave S/S 3rd St
Houser Way/Mill Ave S
NE 12th St; west of Sunset Blvd
NE 12th St; east of Sunset Blvd
Bronson Way N/Park Ave N;
adjacent to Liberty Park
SR900/Oakesdale Ave SW
SE Petrovitsky Dr/118th Ave SE
SE Petrovitsky Dr/122 Pl SE
Map # Project Name
2 SW 43rd St Preservation
3 Oakesdale Ave SW Preservation Project
4.1 South 116th Sidewalk Project
6.1 Oakesdale Ave SW & SW 41st St Intersection Improvements
7.1 Safe Routes to Transit
10.1 Maplewood Sidewalk Rehabilitation
15 Houser Way Bridge Seismic Retrofit and Painting
16 NE Sunset Boulevard (SR 900) Corridor Improvements
16.1 Sunset Trail
17 Park Ave North Extension
18 Rainier Ave Corridor Improvements Phase 4
19 Rainier Ave N Corridor Improvements Phase 5
20 Renton Connector
21 SE 168th St Protected Bike Lanes
22 South 2nd Street Conversion Project
23 South 7th Street Corridor Improvements
24 Williams Ave N Bridge Seismic Retrofit and Painting
25 116th Ave SE Improvements
26 Carr Road improvements
27 Grady Way & Rainier Ave Intersection Improvements
28 Hoquiam Ave NE Non-motorized Improvements
29 Houser Way Non-Motorized Improvements
30 Houser Way North Shared Use Path
31 Lind Ave SW Roadway Widening
33 Logan Ave North Improvements
34 Maple Valley Highway Barriers
35 Monster Road SW/68th Ave S Roadway Improvements
36 N 8th St Direct Access Ramps
37 NE 3rd Street Corridor Improvements
38 NE 4th St Corridor Improvements
39 NE Sunset Blvd Transit and Access Improvements
40 Nile Ave NE Bridge Replacement
41 Renton-Maple Valley Highway & 140th Way SE
42 Renton Bus Rapid Transit (BRT) Improvements
43 South 3rd Street Conversion Project
44 South Grady Way Multi-Modal Improvements
46 Lake to Sound (L2S) Trail
47 South Lake Washington Transit Hub
48 Southport Pedestrian Connection
49 SW 27th Street/Strander Boulevard Connection
50 NE 44th Street/I-405 Park and Ride
51 Eastrail
CED-1 I-405/44th Gateway Signage & Green-scaping Improvements
10
AGENDA ITEM # 10. a)
11
AGENDA ITEM # 10. a)
Section C
Development and Prioritization
2024 – 2029 Transportation Improvement Program
12
AGENDA ITEM # 10. a)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
TIP Development
The Transportation Systems Division creates and maintains an interconnected, multimodal network so that
people and goods move safely and efficiently. The six-year Transportation Improvement Program (TIP) is a
short-range planning document that is annually updated based on needs and policies identified in the City of
Renton’s Comprehensive Plan, and other adopted plans such as: the City Center Community Plan, Sunset
Area Community Investment Strategy, Benson Hill Community Plan, Downtown Civic Core Vision & Action
Plan, and the Renton Trails and Bicycle Master Plan.
As the city Business Plan is updated annually and reflects current Council priorities, the annual update of the
TIP helps ensure that Transportation Capital Programming stays aligned with the City’s current goals and
aspirations. Programs and long-term plans are intended for equitable outcomes citywide and to address
historical inequities in the services that the Transportation System Division provides. Out of these efforts
come the discreet projects that are funded or waiting to be funded.
TIP project and financial development activities are intricately intertwined and involve interactions with
multiple groups and agencies at the local, regional, state and federal levels. Within the Transportation
Systems Division, the Planning and Programming Section coordinates project development year-round
with the Transportation Operations, Transportation Maintenance Section, and the Transportation Design
Section.
Within the City of Renton, there are actions and interactions involving other departments and divisions, the
private sector, the City Council and Administration, which strongly influence the direction of the
transportation program. With its heavy dependence on many different and unpredictable sources of
external funding and with the significant impacts created by ongoing local and regional land use decisions,
transportation project development is a continuous activity comprised of a multitude of diverse elements.
This TIP represents Renton’s current list of needed projects and programs for the next six years.
13
AGENDA ITEM # 10. a)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
The TIP process increases
transparency and alignment to
the City’s vision as projects or
programs get added, edited, or
removed with each annual
update. Each program and
project is assigned a category
type for CIP organization:
Operations and Safety (OS),
Maintenance and Preservation
(MP) , Roadway Corridor (RC),
Non-Motorized (NM) and
Other Programs/Planning (OP).
However, some projects or
programs fall into more than
one category and this is
conveyed by the project
aspects, or goals/purposes,
listed on each project
information page.
PROJECT ASPECTS:
Maintenance and Preservation: Projects with this aspect include transportation assets that should be
replaced or rehabilitated at the point of lowest cost in the life-cycle to maximize use of funding sources.
Projects that preserve and maintain an asset will extend the useful life before more extensive and costly
repairs or reconstruction are needed.
Operations and Safety: Projects and programs with this aspect help the safety and efficiency of traffic
operations. Typical project elements include roadway widening, road diets, channelization, signage,
street lighting, traffic signals, transit speed and reliability, and roadside safety.
Non-Motorized: Projects that address improved mobility of any self-propelled, human-powered mode
of transportation improve community quality of life. A safe and vibrant community depends on the
ability to provide safe access to those walking, riding bicycles or other non-motorized vehicles. Projects
typically included in the TIP with this aspect expand the pedestrian and bicycle network throughout the
city where missing or where there is needed improvement.
Plan Implementation and Compliance/Other Programs: This aspect involves efforts needed for
planning, designing, and construction of roadway improvements necessitated by new development,
regulatory compliance and other reasons, such as regional transportation projects, economic
development, Council policy and/or directive(s).
Roadway Corridor: This aspect involves efforts to improve whole segments of the system through a
corridor approach that address safety and adequate flow-through.
14
AGENDA ITEM # 10. a)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
Each program/project has a current FUNDING STATUS that identifies if it has funding or if it is a “candidate”
project with no determined funding source at this time.
Plan Category Funding Status Project Status TIP Actions
Fully Funded - CN Under Construction /
Project Closeout
All funds programmed and all grant funds
obligated.
Funded - CN
Design >60% Complete /
Funded for Construction
Getting ready for Construction
Documentation.
All funds programmed and/or will
obligate grant funds when ready, and if
necessary.
Partially Funded - CN
Design In Progress/ <60% Complete .
Environmental process complete.
Getting ready for Final Review plans.
Some funds programmed for Construction
phase, such as grant funding. More
funding needed.
Partially Funded
- PE/ROW
Design In Progress/ >30% Complete.
ROW phase is relevant to project.
Programmed for PE and ROW and/or will
obligate for ROW grant funds when ready
and if necessary.
Construction Phase NOT FUNDED.
Partially Funded - PE
Design In Progress. Project only funded
for Design. Waiting for available revenue
sources for other phases.
Programmed for PE only and other
analysis remains to be done.
Construction Phase NOT FUNDED.
Program Funding Multiple Projects in various phases. Funding is allocated annually.
Candidate Project identified in other Planning
Document(s) as high priority/high need.
No determined funding programmed.
May need further analysis.
Other – Led by Others Projects led by other departments or
agencies but affects overall system.No determined funding programmed.
CONSTRAINED
Unprogrammed
Each program/project is ranked against the others on the
list using select criteria to create an initial priority list. The
prioritization list is developed primarily for rank order in
the Transportation CIP budget documents and then
adjusted for significant changes in the mid-biennium TIP.
Council and the Mayor provide feedback and comments for
final ranking.
•Addresses identified hazard
•Addresses traffic safety concerns
•Preventative actions to reduce injuries
Safety
•Listed in existing city planning documents
•Aligns with existing City Plans
•Supports economic development
Plan
Implementation
•Essential to transportation network operations
•Improves/maintains Infrastructure or System
•Fills gap in facilities or network
System Integrity
•Grant commitment/delivery needs
•Prevent loss of funds
•Reduces risk or liability
Financial
•Identified as priority by elected official
•Regulator directed/court order
•High rank in previous TIP
Directives
•Addresses environmental impacts
•Addresses development impactsMitigative
High
Medium
Low
15
AGENDA ITEM # 10. a)
INSERT BUSINESS PLAN
16
AGENDA ITEM # 10. a)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
Expenditures and Revenues
The City relies heavily on grant funding to leverage the amount of local funding to implement the larger
capital projects. Since projects need to be included in the TIP to be eligible for grants, the projects and
programs included in the TIP are projects the City would like to implement in the six-year timeframe if
funding were available. The document also identifies secured or reasonably expected revenues for each of
the projects included in the TIP to aid in future budget discussions.
The City is proposing the adoption of a citywide Transportation Benefit District (TBD) that is anticipated to
generate approximately $3,500,000 in revenue annually. The TBD revenues can enhance investment in
various transportation projects and programs including those outlined in the TIP, Trails and Bicycle Master
Plan, and the ADA Transition Plan.
This document is one step in developing the fiscally-constrained Transportation CIP as part of the City’s
17
AGENDA ITEM # 10. a)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
Summary of Projects and Prioritization
The prioritization of the TIP is influenced by the interconnection and/or interdependence among TIP
projects, projects by other City departments, projects by other jurisdictions, as well as the timing of those
other projects. The significance of the prioritization process of the TIP in preparation for budget discussions
is that the projects and programs are in a ranked order and provide one way to look at the program as a
whole. The projects/programs that do not have secured funding would not appear in budget documents.
The ratings across the scoring criteria are qualitative because the intent is to create an initial prioritized list
of all the projects and programs listed in the TIP. This prioritization does not directly affect how much
funding specific projects or programs receive. Ultimately, this is dependent on how much funding is
available and final funding decisions are made by the elected policy makers. The TIP is a resource that can
be used to help make policy and budget decisions.
Summary of Projects/Programs by
Neighborhood Planning Area
18
AGENDA ITEM # 10. a)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
Prioritization Summary
19
AGENDA ITEM # 10. a)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
Prioritization Summary
High
Medium
Low
•Addresses identified hazard
•Addresses traffic safety concerns
•Preventative actions to reduce injuries
Safety
•Listed in existing city planning documents
•Aligns with existing City Plans
•Supports economic development
Plan
Implementation
•Essential to transportation network operations
•Improves/maintains Infrastructure or System
•Fills gap in facilities or network
System Integrity
•Grant commitment/delivery needs
•Prevent loss of funds
•Reduces risk or liability
Financial
•Identified as priority by elected official
•Regulator directed/court order
•High rank in previous TIP
Directives
•Addresses environmental impacts
•Addresses development impactsMitigative
20
AGENDA ITEM # 10. a)
21
AGENDA ITEM # 10. a)
Section E
Program/Project Details
2024 – 2029 Transportation Improvement Program
22
AGENDA ITEM # 10. a)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
2024-2029
TIP# Name Planning Area
23-01 Street Overlay Citywide
23-02 SW 43rd St Preservation Valley
23-03 Oakesdale Ave SW Preservation Project Valley
23-04 Walkway Program Citywide
23-04.1 South 116th Sidewalk Project Benson
23-05 Roadway Safety and Guardrail Program Citywide
23-06 Intersection Safety & Mobility Program Citywide
23-06.1 Oakesdale Ave SW & SW 41st St Intersection Improvements Valley
23-07 Traffic Safety Program Citywide
23-07.1 Safe Routes to Transit Various
23-07.2 Traffic Calming Program Citywide
23-08 Traffic Signal Preservation Program Citywide
23-09 Intelligent Transportation Systems (ITS) Program Citywide
23-10 Sidewalk Rehabilitation and Replacement Program Citywide
23-10.1 Maplewood Sidewalk Rehabilitation Cedar River
23-11 Bridge Inspection & Repair Program Citywide
23-12 Barrier-Free Transition Plan Implementation Citywide
23-13 Project Development & Pre-Design Program Citywide
23-14 Arterial Circulation Program Citywide
23-15 Houser Way Bridge Seismic Retrofit and Painting City Center
23-16 NE Sunset Boulevard (SR 900) Corridor Improvements Highlands
23-16.1 Sunset Trail Highlands
23-17 Park Ave North Extension City Center
23-18 Rainier Ave Corridor Improvements Phase 4 City Center
23-19 Rainier Ave N Corridor Improvements Phase 5 City Center
23-20 Renton Connector City Center
23-21 SE 168th St Protected Bike Lanes Benson
23-22 South 2nd Street Conversion Project City Center
23-23 South 7th Street Corridor Improvements City Center
23-24 Williams Ave Bridge Seismic Retrofit and Painting City Center
23-25 116th Ave SE Improvements Benson
23-26 Carr Road improvements Talbot, Benson
23-27 Grady Way & Rainier Ave Intersection Improvements City Center
23-28 Hoquiam Ave NE Non-Motorized Improvements East Plateau
23-29 Houser Way Non-Motorized Improvements City Center
23-30 Houser Way North Shared Use Path City Center
23
AGENDA ITEM # 10. a)
2024-2029
TIP# Name Planning Area
23-31 Lind Ave SW Roadway Widening Valley
23-32 Local Road Safety Plan Implementation Citywide
23-33 Logan Ave North Improvements City Center
23-34 Maple Valley Highway Barriers Cedar River
23-35 Monster Road SW/68th Ave S Roadway Improvements Valley
23-36 N 8th St Direct Access Ramps City Center
23-37 NE 3rd Street Corridor Improvements Highlands, East Plateau
23-38 NE 4th St Corridor Improvements Highlands, East Plateau
23-39 NE Sunset Blvd Transit and Access Improvements Highlands
23-40 Nile Ave NE Bridge Replacement East Plateau
23-41 Renton-Maple Valley Highway & 140th Way SE Cedar River
23-42 Renton Bus Rapid Transit (BRT) Improvements City Center
23-43 South 3rd Street Conversion Project City Center
23-44 South Grady Way Multi-Modal Improvements City Center
23-45 Transit Master Plan Citywide
23-46 Lake to Sound (L2S) Trail City Center
23-47 South Lake Washington Transit Hub City Center
23-48 Southport Pedestrian Connection City Center
23-49 SW 27th Street/Strander Boulevard Connection Valley
23-50 NE 44th Street/I-405 Park and Ride Kennydale
23-51 Eastrail City Center
CED-1 I-405/44th Gateway Signage & Green-scaping Improvements Kennydale
24
AGENDA ITEM # 10. a)
PROGRAM
Priority Rank:11
Project Account #:122108
Planning Area:Citywide
Street Classification:varies
Project Length:various
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Maintenance and Preservation
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits 424,241 88,241 - 336,000 56,000 56,000 56,000 56,000 56,000 56,000
Planning - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 10,345,376 1,222,307 459,069 8,664,000 1,444,000 1,444,000 1,444,000 1,444,000 1,444,000 1,444,000
Construction Services - - - - - - - - - -
Total Expenses 10,769,617 1,310,548 459,069 9,000,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 1,769,617 1,310,548 459,069 - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
*Trans Benefit District (TBD)9,000,000 - - 9,000,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000
Total Resources 10,769,617 1,310,548 459,069 9,000,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000
This program funds resurfacing and other pavement preservation treatments for city streets and alleyways. Installation of ADA-
compliant curb ramps is incorporated into the overlay program in accordance to federal requirements.
Street Overlay TIP #: 23-01
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
To extend the useful life of the pavement surface and reduce the need for roadway reconstruction.
The City's average Pavement Condition Index (PCI) is currently rated at 73. City staff has developed a 10 year pavement preservation
plan to keep the citywide average PCI at or above 70 and forecasts the annual funding need will be at least $2,100,000. This program
has the potential to be funded through Transportation Benefit District (TBD) financing. We anticipate TBD would generate
$3,500,000/year and $1,500,000 would be applied to this program starting in 2024. The annual Street Overlay contract will require
annual investment of $1,500,000 to keep the roads in good working condition. The remaining $600,000 of funding need is work
performed by city maintenance crews as part of their annual maintenance preservation work.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
1,769,617
25
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:12
Project Account #:122999
Planning Area:Valley
Street Classification:Principal Arterial
Project Length:1.14 mi
Funding Status:Partially Funded - CN
Project Description:
Program Aspects: Maintenance and Preservation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - -
Preliminary Engineering 508,314 80,463 427,851 - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 4,719,700 - - 4,719,700 4,719,700 - - - - -
Construction Services 700,000 - - 700,000 700,000 - - - - -
Total Expenses 5,928,014 80,463 427,851 5,419,700 5,419,700 - - - - -
Source of Fund:
REET 1/2 2,250,000 427,851 1,822,149 1,822,149 - - - - -
B&O Tax 1,263,314 80,463 - 1,182,851 1,182,851 - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 2,414,700 - - 2,414,700 2,414,700
Total Resources 5,928,014 80,463 427,851 5,419,700 5,419,700 - - - - -
SW 43rd St Preservation,
west City limits to SR 167 ramps TIP #: 23-02
To extend the useful life of SW 43rd St and improve public safety.
The project had been federally funded, but the federal funds were swapped out with local funds and reallocated to another city project
in order to assist the Region with meeting its annual delivery target. As a result, the City agreed to complete construction of the project
with local funds. Design will be complete in 2023. Construction is set to begin in Spring 2024.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This project will resurface the roadway from the western city limits to the SR 167 Ramps, except where there are existing concrete
panels. This project will also upgrade all intersection ramps to current ADA standards as well as install and replace all delineation to City
of Renton standards. Also included in this project are storm drainage improvements and the adjustment or evaluation for replacement
of existing features affected by resurfacing such as monuments, catch basins, or drainage grates.
3,513,314 2,414,700
26
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:13
Project Account #:122104
Planning Area:Valley
Street Classification:Minor Arterial
Project Length:1.14 mi
Funding Status:Funded - CN
Project Description:
Program Aspects: Maintenance and Preservation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - -
Preliminary Engineering 400,000 - 400,000 - - - - - - -
R-O-W (includes Admin)50,000 - - 50,000 50,000 - - - - -
Construction 2,008,110 - - 2,008,110 - 2,008,110 - - - -
Construction Services - - - - - - - - - -
Total Expenses 2,458,110 - 400,000 2,058,110 50,000 2,008,110 - - - -
Source of Fund:
REET 1/2 1,158,110 400,000 758,110 50,000 708,110 - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (Federal)1,300,000 - - 1,300,000 - 1,300,000 - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - -
Total Resources 2,458,110 - 400,000 2,058,110 50,000 2,008,110 - - - -
Oakesdale Ave SW Preservation Project,
SW 34th St to SW 16th St TIP #: 23-03
The current conditions of the pavement and the amount of heavy traffic on this roadway warrants the need for preventative
maintenance. This project is on a major truck route on a key transit corridor. Resurfacing this roadway will improve the overall condition
of the pavement and the project will extend the pavement life.
This project received a federal Surface Transportation Block Grant (STBG) for construction in 2022 in the amount of $1,300,000. Design
began in 2023. Construction funding will be available FY 2025.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This project will resurface the roadway along Oakesdale Ave SW from SW 34th St northward to SW 16th St. This project will install signed
and marked bike lanes, update channelization, adjust or upgrade intersection ramps and corners to current ADA standards, adjust or
evaluate the replacement of existing features affected by resurfacing such as monuments, catch basins, or drainage grates. The existing
shoulders north of SW 27th St serve as unofficial bike lanes as noted in the Trails and Bicycle Master Plan.
2,458,110 -
*Picture: Current Intersection of Oakesdale Ave SW and SW 27th St.
27
AGENDA ITEM # 10. a)
PROGRAM
Priority Rank:34
Project Account #:120009
Planning Area:Citywide
Street Classification:varies
Project Length:N/A
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 12,317,096 - 317,096 12,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000
Construction Services - - - - - - - - - -
Total Expenses 12,317,096 - 317,096 12,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 317,096 - 317,096 - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
*Trans Benefit District (TBD)12,000,000 - - 12,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000
Total Resources 12,317,096 - 317,096 12,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000
Walkway Program TIP #: 23-04
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This program provides for the design and construction of non-motorized transportation facilities for pedestrians as well as to provide City
match funding for larger federal and state funded projects. This fund can also be used as City/local match for grant applications.
To provide safe and convenient non-motorized facilities to complete the city-wide transportation network. Specific improvements will
respond to the needs of school children, the elderly and persons with disabilities, and support increased use of transit.
Staff is in the process of identifying where walkways do not exist citywide. Once identified, funding will be used to replace or install the
missing sidewalks based on a prioritized schedule. This program has the potential to be funded through Transportation Benefit District
(TBD) financing. We anticipate TBD would generate $3,500,000/year and $2,000,000 would be applied to the annual Walkway Program
in future years. There is current funding programmed for improvements along South 116th St that is shown in its own TIP sheet (TIP #23-
04.1).
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
317,096
*Picture: Example of missing sidewalk in Benson neighborhood.
28
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:6
Project Account #:122804
Planning Area:Benson
Street Classification:Minor Arterial
Project Length:0.16 mi
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 1,000,000 - 500,000 500,000 500,000 - - - - -
Construction Services - - - - - - - - - -
Total Expenses 1,000,000 - 500,000 500,000 500,000 - - - - -
Source of Fund:
REET 1/2 1,000,000 - 500,000 500,000 500,000 - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources 1,000,000 - 500,000 500,000 500,000 - - - - -
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This project will install sidewalk, curb and gutter, drainage and possible planter strip along S 116th St from SE 162nd St to SE 160th St.
To provide safe and convenient non-motorized facilities to complete the city-wide transportation network.
New project.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
1,000,000 -
*Picture: Existing conditions along 116th Ave SE.
South 116th Sidewalk Project TIP #: 23-04.1
29
AGENDA ITEM # 10. a)
PROGRAM
Priority Rank:18
Project Account #:120110
Planning Area:Citywide
Street Classification:varies
Project Length:N/A
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Maintenance and Preservation; Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 335,000 - 35,000 300,000 50,000 50,000 50,000 50,000 50,000 50,000
Construction Services - - - - - - - - - -
Total Expenses 335,000 - 35,000 300,000 50,000 50,000 50,000 50,000 50,000 50,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 35,000 - 35,000 - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 300,000 - - 300,000 50,000 50,000 50,000 50,000 50,000 50,000
Total Resources 335,000 - 35,000 300,000 50,000 50,000 50,000 50,000 50,000 50,000
Before After
Roadway Safety and Guardrail Program TIP #: 23-05
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This program will provide guardrail improvements annually and will improve the safety of the roadside environment.
To implement roadside safety improvements including barrier systems and hazardous object removal.
This program will develop a policy and standardized criteria for barriers and selection of projects.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
35,000 300,000
30
AGENDA ITEM # 10. a)
PROGRAM
Priority Rank:19
Project Account #:122601
Planning Area:Citywide
Street Classification:varies
Project Length:N/A
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - -
Preliminary Engineering 66,096 26,734 39,362 - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 940,001 257,271 182,730 500,000 - 100,000 100,000 100,000 100,000 100,000
Construction Services - - - - - - - - - -
Total Expenses 1,006,097 284,005 222,092 500,000 - 100,000 100,000 100,000 100,000 100,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 406,097 284,005 122,092 - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation 600,000 - 100,000 500,000 - 100,000 100,000 100,000 100,000 100,000
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources 1,006,097 284,005 222,092 500,000 - 100,000 100,000 100,000 100,000 100,000
Intersection Safety & Mobility Program TIP #: 23-06
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This program will install new traffic signals, central signal system upgrades or make improvements to existing signals to improve traffic
signal operations. Historically, one traffic signal is designed and constructed every 2-3 years to meet safety and mobility needs.
To meet safety and mobility needs, new traffic signals are needed to meet increasing demand for signalized traffic control. Elements
used to prioritize project intersections may include vehicular approach volumes, accident analysis, signal-warrant analysis, and
pedestrian volume.
Preliminary engineering for intersection improvements at Oakesdale Ave SW and SW 41st St (TIP #23-06.1) were complete in 2021. The
project remains on hold until all funding for construction and sufficient staff resources have been identified. A portion of 2023
expenditures are shown in the Oakesdale Ave SW and SW 41st St TIP sheet.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
1,006,097 -
31
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:20
Project Account #:
Planning Area:Valley
Street Classification:Principal Arterial
Project Length:N/A
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 1,195,565 - 650,000 545,565 545,565 - - - - -
Construction Services 239,113 - - 239,113 239,113 - - - - -
Total Expenses 1,434,678 - 650,000 784,678 784,678 - - - - -
Source of Fund:
REET 1/2 - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation 650,000 - 650,000 - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 784,678 - - 784,678 784,678
Total Resources 1,434,678 - 650,000 784,678 784,678 - - - - -
Oakesdale Ave SW & SW 41st St Intersection
Improvements TIP #: 23-06.1
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This project would install a new traffic signal with marked crosswalks at the intersection of Oakesdale Ave SW and SW 41st St.
To improve access and safety to meet safety and mobility needs. The project will help meet increasing demand and reduce the potential
for crashes, making the corridor more attractive to users of the adjacent Springbrook Creek Trail and for motorists/freight vehicles
travelling through to the major retailers and businesses along this corridor and within the vicinity.
This project was designed within the Intersection Safety and Mobility Program. Design is complete however Staff is currently evaluating
whether culvert replacement is needed at the intersection. Project is currently on hold until the full construction funding can be
identified. *Funding shown in 2023 will be programmed in a subsequent budget adjustment.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
650,000 784,678
32
AGENDA ITEM # 10. a)
PROGRAM
Priority Rank:9
Project Account #:122115
Planning Area:Citywide
Street Classification:varies
Project Length:N/A
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Other 30,024 30,024 - - - - - - - -
Professional Services 109,211 97,211 12,000 - - - - - - -
Preliminary Engineering 31,681 31,681 - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 1,669,496 16,559 102,937 1,550,000 50,000 300,000 300,000 300,000 300,000 300,000
Construction Services - - - - - - - - - -
Total Expenses 1,840,412 175,476 114,937 1,550,000 50,000 300,000 300,000 300,000 300,000 300,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 340,412 175,476 114,937 50,000 50,000 - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 1,500,000 - - 1,500,000 - 300,000 300,000 300,000 300,000 300,000
Total Resources 1,840,412 175,476 114,937 1,550,000 50,000 300,000 300,000 300,000 300,000 300,000
*Picture: Benson Rd S/S 29th St where crossing improvements, including installation of a Rectangular Rapid Flashing Beacon (RRFB), have been completed.
Traffic Safety Program TIP #: 23-07
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This program funds small-scale traffic safety improvements that require materials, labor, or equipment. These types of improvements
include, but are not limited to, converting school zone signs to electronic operation, installation of pedestrian safety traffic signals, radar
speed signs, and physical devices for traffic calming. This program has become increasingly important after the city's adoption of a Local
Road Safety Plan that helped prioritize safety related projects throughout the city.
To address traffic safety concerns, increase pedestrian/bicycle safety, and help encourage responsible driving through engineering.
Ongoing based on requests received by the public and city staff for evaluation and analysis. Funds can be supplied from this program to
construct the projects developed from the year, 2020, Safe Routes to Transit project (TIP #23-07.1) in association with the Renton-Kent-
Auburn Area Mobility Plan for the design and purchase of materials for pedestrian safety improvements. The City is constructing speed
cushions along Lake Washington Blvd (TIP #23-07.2) to address speeding concerns and will fund the completion of design work for a
HAWK signal at the intersection of Duvall Ave NE and NE 6th Street.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
340,412 1,500,000
33
AGENDA ITEM # 10. a)
PROGRAM
Priority Rank:17
Project Account #:123009
Planning Area:various
Street Classification:varies
Project Length:N/A
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - -
Preliminary Engineering 1,515,076 1,515,076 - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 1,942,924 818 452,106 1,490,000 250,000 250,000 220,000 345,000 425,000 -
Construction Services - - - - - - - - - -
Total Expenses 3,458,000 1,515,894 452,106 1,490,000 250,000 250,000 220,000 345,000 425,000 -
Source of Fund:
REET 1/2 468,000 41,930 426,070 - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (KC Metro)1,500,000 1,473,964 26,036 - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 1,490,000 - - 1,490,000 250,000 250,000 220,000 345,000 425,000 -
Total Resources 3,458,000 1,515,894 452,106 1,490,000 250,000 250,000 220,000 345,000 425,000 -
Safe Routes to Transit TIP #: 23-07.1
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
Capital projects that improve safety, convenience and accessibility for people walking, bicycling and using assistive mobility devices
(such as wheelchairs or walkers) to connect to transit services and facilities. King County Metro agreed to compensate the City for design
and acquire materials ($1,500,000) for agreed upon locations in Fall 2020. Construction is estimated to extend through 2028.
To improve safety, convenience and accessibility for people walking, bicycling and using assistive mobility devices (such as wheelchairs
or walkers) to connect to transit services and facilities.
All 18 projects have pre-100% or completed design plans. Three projects were completed by city Transportation Sign Maintenance crews
including a cycle track and two intersection lane configurations using low-cost delination devices, signing and pavement marking. One
project is currently under construction by an outside contractor for three pedestrian crossings with pedestrian signalization, flashing
beacons and wheelchair ramps along NE Sunset Blvd. Available funds within the Traffic Safety Program can be transferred to this
program to help fund the construction of the remaining projects, as needs arise. Where possible, the remaining projects can be funded
and constructed within the limits of other transportation projects being constructed, i.e. E. Valley Rd./S. 180th St. Pedestrian
Crossing/Ramp improvements as part of the city overlay project. Future funding allocated to this program will be utilized to fund
remaining projects.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
1,968,000 1,490,000
*Picture: Improvements made at 128th Ave SE and SE 168th St.
34
AGENDA ITEM # 10. a)
PROGRAM
Priority Rank:36
Project Account #:123010
Planning Area:Citywide
Street Classification:Local or Collector
Project Length:Varies
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - -
Preliminary Engineering 409,000 - - 409,000 50,000 45,000 45,000 154,000 45,000 70,000
R-O-W (includes Admin)- - - - - - - - - -
Construction 1,057,650 - 196,650 861,000 183,000 82,000 83,000 278,000 109,000 126,000
Construction Services 176,350 - 53,350 123,000 26,000 12,000 12,000 39,000 16,000 18,000
Total Expenses 1,643,000 - 250,000 1,393,000 259,000 139,000 140,000 471,000 170,000 214,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 250,000 - 250,000 - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 1,393,000 - - 1,393,000 259,000 139,000 140,000 471,000 170,000 214,000
Total Resources 1,643,000 - 250,000 1,393,000 259,000 139,000 140,000 471,000 170,000 214,000
Traffic Calming Program TIP #: 23-07.2
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
The City developed a traffic calming program that specifically targets speeding in or around residential areas by utilizing tier 1 traffic
calming devices, and then utilizing tier 2 traffic calming devices, only after exhausting tier 1 traffic calming devices. Tier 1 traffic calming
devices would include signing, plastic curbing, pavement markings, or other treatments that passively reduce speeding. Tier 2 traffic
calming devices would include raised crosswalks, speed cushions, mini-roundabouts or other treatments that actively reduce speeding.
The City is on track to complete the first speed cushion installation on Lake Washington Blvd N in summer 2023, and has preliminary
engineering designs for six other locations that will be completed as funding becomes available. The City will also consider other suitable
traffic calming treatments to reduce speeds at these locations if speed cushions are less feasible. List of locations can be found in the
City's 2022-2023 Traffic Calming Locations: Technical Analysis Summary report.
Reduce speeding in or around residential areas on streets classified as local or collector with 25 mph or less.
New program. *Funding shown in 2023 will be programmed in a subsequent budget adjustment.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
250,000 1,393,000
35
AGENDA ITEM # 10. a)
PROGRAM
Priority Rank:21
Project Account #:122904
Planning Area:Citywide
Street Classification:varies
Project Length:N/A
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Maintenance and Preservation, Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Other 77,981 77,981 - - - - - - - -
Professional Services - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 707,147 25,115 182,032 500,000 - 100,000 100,000 100,000 100,000 100,000
Construction Services - - - - - - - - - -
Total Expenses 785,128 103,096 182,032 500,000 - 100,000 100,000 100,000 100,000 100,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 285,128 103,096 182,032 - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 500,000 - - 500,000 - 100,000 100,000 100,000 100,000 100,000
Total Resources 785,128 103,096 182,032 500,000 - 100,000 100,000 100,000 100,000 100,000
Traffic Signal Preservation Program TIP #: 23-08
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
The City of Renton owns and operates 135 traffic signals. This program replaces obsolete and failed video detection cameras, signal
heads, signal cabinets, UPS batteries and LED indications as needed based on the findings from the following annual preventative
maintenance programs: Signal cabinet replacement program, signal head replacement program and the LED change out program.
To maintain the City's traffic signals operating as efficiently as possible and to maintain the retroflectivity of all the traffic signs.
Most of Renton's traffic signals and UPS systems require extensive maintenance and preventative maintenance programs to keep traffic
signals operating as efficiently as possible and to prevent them from going into red flash failure mode. Pavement deterioration has
increased the number of failed loops throughout the City and as loops fail they are replaced with video detection cameras and associated
equipment, greatly increasing public safety. Funding will be used for the replacement of up to 60 traffic signal UPS batteries, 4 signal
cabinets, 4 intersection signal head change outs, and 32 intersection LED change outs.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
285,128 500,000
36
AGENDA ITEM # 10. a)
PROGRAM
Priority Rank:35
Project Account #:122162
Planning Area:Citywide
Street Classification:varies
Project Length:N/A
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Maintenance and Preservation, Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Planning 30,000 - 30,000 - - - - - - -
Professional Services - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 555,493 - 133,493 422,000 47,000 75,000 75,000 75,000 75,000 75,000
Construction Services - - - - - - - - - -
Total Expenses 585,493 - 163,493 422,000 47,000 75,000 75,000 75,000 75,000 75,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 210,493 - 163,493 47,000 47,000 - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 375,000 - - 375,000 - 75,000 75,000 75,000 75,000 75,000
Total Resources 585,493 - 163,493 422,000 47,000 75,000 75,000 75,000 75,000 75,000
Intelligent Transportation Systems (ITS) Program TIP #: 23-09
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
Intelligent Transportation Systems (ITS) includes physical tools and technologies/software such as signal controller upgrades, fiber optic
communication, supporting communication equipment, security of the transportation network, cameras for monitoring traffic
congestion and effects of signal timing, a data management system and traffic adaptive systems, dynamic message signs and transit
signal priority.
To maximize the operations and efficiency of the roadway system without adding additional capacity.
Current funding will cover the cost to conduct an ITS Master Plan and to cover the cost to pay WSDOT for placement of city conduit
within and across the I-405 and 44th Street Interchange. Future years funding will be used for high priority projects identified in the ITS
Master Plan. The Plan will help staff prioritize future shadow conduit opportunities with franchise utilities as well as other needs, such as
ITS security software programs and hardware equipment for the Transportation fiber optic networks.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
210,493 375,000
37
AGENDA ITEM # 10. a)
PROGRAM
Priority Rank:22
Project Account #:122801
Planning Area:Citywide
Street Classification:varies
Project Length:N/A
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Maintenance and Preservation, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 600,000 630 99,370 500,000 - 100,000 100,000 100,000 100,000 100,000
Construction Services - - - - - - - - - -
Total Expenses 600,000 630 99,370 500,000 - 100,000 100,000 100,000 100,000 100,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 100,000 630 99,370 - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 500,000 - - 500,000 - 100,000 100,000 100,000 100,000 100,000
Total Resources 600,000 630 99,370 500,000 - 100,000 100,000 100,000 100,000 100,000
Sidewalk Rehabilitation and Replacement Program TIP #: 23-10
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This program provides for the replacement of existing curb and gutter, sidewalks, and curb ramps where such facilities have deteriorated
or have been damaged.
To address existing sidewalk deficiencies and provide safer facilities for pedestrians on neighborhood streets.
The City completed a condition survey of the existing sidewalks in 2021. Staff are currently validating the data and will begin work on
prioritizing sidewalk locations for repairs and maintenance. The money programmed in 2023 is for improvements along Cedar Ave S and
the money programmed in 2024 is shown in it's own TIP sheet (TIP #23-10.1) and will be used to complete improvements in the
Maplewood Glen neighborhood subdivision.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
100,000 500,000
38
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:29
Project Account #:122803
Planning Area:Cedar River
Street Classification:varies
Project Length:varies
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Maintenance and Preservation, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 1,000,000 - - 1,000,000 1,000,000 - - - - -
Construction Services - - - - - - - - - -
Total Expenses 1,000,000 - - 1,000,000 1,000,000 - - - - -
Source of Fund:
REET 1/2 1,000,000 - - 1,000,000 1,000,000 - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources 1,000,000 - - 1,000,000 1,000,000 - - - - -
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This project will remove and replace curb and sidewalks in the Maplewood Glen neighborhood.
To address existing sidewalk deficiencies and provide safer facilities for pedestrians on neighborhood streets. Also provides for
pavement/roadway overlay.
New project.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
1,000,000 -
Maplewood Sidewalk Rehabilitation TIP #: 23-10.1
39
AGENDA ITEM # 10. a)
PROGRAM
Priority Rank:3
Project Account #:120106
Planning Area:Citywide
Street Classification:varies
Project Length:N/A
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Maintenance and Preservation, Plan Implementation and Compliance
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits 25,000 10,509 14,491 - - - - - - -
Professional Services 145,496 58,090 87,406 - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services 510,133 5,873 204,260 300,000 50,000 50,000 50,000 50,000 50,000 50,000
Total Expenses 680,630 74,472 306,157 300,000 50,000 50,000 50,000 50,000 50,000 50,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 430,630 74,472 306,157 50,000 50,000 - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 250,000 - - 250,000 - 50,000 50,000 50,000 50,000 50,000
Total Resources 680,630 74,472 306,157 300,000 50,000 50,000 50,000 50,000 50,000 50,000
Bridge Inspection & Repair Program TIP #: 23-11
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
Per 23 CFR 650 Subpart C, the City is required to perform condition inspections on all City owned bridge structures, located in the
public right-of-way, open for public use and spanning 20-ft or more. There are presently 27 bridge structures included in the program.
They are inspected every two years to monitor the condition of bridge elements and identify deficiencies in need of repair. Updates to
bridge load ratings and scour evaluations are periodically performed based upon the condition of the bridge structures and/or new
directives from.
The goals of the program are to keep the bridges open and safe for public use, preserve bridge infrastructure by maximizing the useful
life through active maintenance, retrofitting and rehabilitation, and replace bridges with reliable new structures when repair or
rehabilitation is not feasible.
Funds shown under construction are for minor repairs to bridge structures.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
430,630 250,000
40
AGENDA ITEM # 10. a)
PROGRAM
Priority Rank:15
Project Account #:122705
Planning Area:Citywide
Street Classification:varies
Project Length:N/A
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Operations and Safety, Plan Implementation and Compliance
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 1,396,921 96,921 50,000 1,250,000 50,000 240,000 240,000 240,000 240,000 240,000
Construction Services - - - - - - - - - -
Total Expenses 1,396,921 96,921 50,000 1,250,000 50,000 240,000 240,000 240,000 240,000 240,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 196,921 96,921 50,000 50,000 50,000 - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 1,200,000 - - 1,200,000 - 240,000 240,000 240,000 240,000 240,000
Total Resources 1,396,921 96,921 50,000 1,250,000 50,000 240,000 240,000 240,000 240,000 240,000
Barrier-Free Transition Plan Implementation TIP #: 23-12
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This program provides funding for designing and building features in response to individual requests to improve access for pedestrians
and evaluates per the current ADA Transition Plan.
To support the City's effort to transition pedestrian facilities within the right-of-way into conformity with provisions contained in the
Americans with Disabilities Act (ADA) Guidelines. An updated ADA Transition Plan was adopted on December 13, 2021. A
programmatic approach is required to ensure compliance with federal law.
An update to the ADA Transition Plan was complete in 2021. The plan recommended additional investment of $240,000/year over
historical funding allocation (over 50 years) to support plan implementation for pedestrian barrier removal.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
196,921 1,200,000
41
AGENDA ITEM # 10. a)
PROGRAM
Priority Rank:26
Project Account #:122150
Planning Area:Citywide
Street Classification:varies
Project Length:N/A
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Plan Implementation and Compliance
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 471,688 61,419 110,269 300,000 50,000 50,000 50,000 50,000 50,000 50,000
Preliminary Engineering 250,709 709 - 250,000 - 50,000 50,000 50,000 50,000 50,000
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 722,397 62,128 110,269 550,000 50,000 100,000 100,000 100,000 100,000 100,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 222,397 62,128 110,269 50,000 50,000 - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 500,000 - - 500,000 - 100,000 100,000 100,000 100,000 100,000
Total Resources 722,397 62,128 110,269 550,000 50,000 100,000 100,000 100,000 100,000 100,000
Project Development & Pre-Design Program TIP #: 23-13
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This program consists of critical activities to develop future capital improvement projects that consist of, but are not limited to, project
scoping, cost estimates, pre-design, interlocal agreements, analyses of existing and projected transportation problems, local and regional
mobility goals and deficiency analyses.
To develop transportation projects that best serve the needs of Renton and meet eligibility requirements for grant applications.
The funding allocated to this program is mainly used to hire consultants to perform the work listed above.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
222,397 500,000
42
AGENDA ITEM # 10. a)
PROGRAM
Priority Rank:39
Project Account #:120029
Planning Area:Citywide
Street Classification:varies
Project Length:N/A
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Plan Implementation and Compliance
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 383,480 1,060 132,420 250,000 - 50,000 50,000 50,000 50,000 50,000
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 383,480 1,060 132,420 250,000 - 50,000 50,000 50,000 50,000 50,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 133,480 1,060 132,420 - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 250,000 - - 250,000 - 50,000 50,000 50,000 50,000 50,000
Total Resources 383,480 1,060 132,420 250,000 - 50,000 50,000 50,000 50,000 50,000
Arterial Circulation Program TIP #: 23-14
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This program provides for the short and long-range planning and traffic analyses required to evaluate and update proposed
transportation improvements projects, to assess the impacts of new development proposals, and to recommend local and regional
transportation system improvements for all modes of travel. This program also covers programmatic activities to maintain compliance in
federal and state regulations, such as assuring that project specifications and management comply with current State and Federal
standards and regulations, Title VI reporting and ADA Transition Plan implementation.
To perform critical activities needed for the development of transportation projects that will best serve the needs of Renton and be
eligible for grant applications.
A Network Mobility Evaluation was completed in 2021 to prepare for the update of the Transportation Element of the City's
Comprehensive Plan. Funding for this program will be evaluated as needs arise.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
133,480 250,000
43
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:4
Project Account #:123001
Planning Area:City Center
Street Classification:Principal Arterial
Project Length:N/A
Funding Status:Funded - CN
Project Description:
Program Aspects: Maintenance and Preservation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 620,000 107,881 300,000 212,119 212,119 - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 2,072,700 - - 2,072,700 - 2,072,700 - - - -
Construction Services 435,000 - - 435,000 - 235,000 200,000 - - -
Total Expenses 3,127,700 107,881 300,000 2,719,819 212,119 2,307,700 200,000 - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 128,700 22,881 40,500 65,319 20,319 45,000 - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (Federal)2,999,000 85,000 259,500 2,654,500 191,800 2,262,700 200,000 - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources 3,127,700 107,881 300,000 2,719,819 212,119 2,307,700 200,000 - - -
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
Houser Way Bridge - Seismic Retrofit and Painting,
across Cedar River TIP #: 23-15
The project will remove the existing paint from the steel girders, repair corrosion damage and apply a new protective paint system. The
project will also perform a seismic analysis and retrofit and replace/upgrade the bridge rails along with other improvements. The Houser
Way Bridge was built by the City of Renton in 1960. It is a three span bridge that crosses over the Cedar River. The main span is carried
by steel girders. The girders are coated with paint to protect the steel from corrosion. Corrosion causes section loss which results in a
reduced load carrying capacity of the girders. The existing paint is failing. The bridge is located in a zone of moderate to high liquification
susceptibility during seismic events. The bridge rail has been damaged.
To help extend the service life of the Houser Way Bridge and reduce the seismic vulnerability.
In late 2017, the project was awarded a Federal Highway Administration (FHWA) grant of $2,999,000 to perform a seismic retrofit and
painting of the bridge. The project is currently in the design phase. Construction is anticipated for summer 2024.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
3,127,700 -
44
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:45
Project Account #:122902
Planning Area:Highlands
Street Classification:Principal Arterial
Project Length:0.93 mi
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety, Active Transportation, Plan Implementation and Compliance
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 2,000,000 - - 2,000,000 - - 1,500,000 500,000 - -
R-O-W (includes Admin)3,000,000 - - 3,000,000 - - - 1,500,000 1,500,000 -
Construction 14,000,000 - - 14,000,000 - - - - 5,000,000 9,000,000
Construction Services 1,000,000 - - 1,000,000 - - - - - 1,000,000
Total Expenses 20,000,000 - - 20,000,000 - - 1,500,000 2,000,000 6,500,000 10,000,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 20,000,000 - - 20,000,000 - - 1,500,000 2,000,000 6,500,000 10,000,000
Total Resources 20,000,000 - - 20,000,000 - - 1,500,000 2,000,000 6,500,000 10,000,000
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This project addresses pedestrian, transit and bicycle needs through key improvements such as channelization, traffic signal
modifications, signal treatments, possible queue jumps, access management through installation of medians and installation of a multi-
use trail. Project will be implemented in phases.
To address area growth, this project will improve access to transit and a non-motorized facility network.
The Sunset Trail project (TIP #23-16.1) will serve as Phase 1 and will construct the multi-use trail portion of the original project. Future
phases and timing will be determined based on available funding.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 20,000,000
NE Sunset Blvd (SR900) Corridor Improvements,
Sunset Blvd NE to Monroe Ave NE TIP #: 23-16
45
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:8
Project Account #:122105
Planning Area:Highlands
Street Classification:Principal Arterial
Project Length:0.32 mi
Funding Status:Partially Funded - PE/ROW
Project Description:
Program Aspects: Operations and Safety, Active Transportation, Plan Implementation and Compliance
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 1,143,000 - 692,150 450,850 450,850 - - - - -
R-O-W (includes Admin)484,000 - - 484,000 - 300,000 184,000 - - -
Construction 7,010,000 - - 7,010,000 - - 3,000,000 4,010,000 - -
Construction Services - - - - - - - - - -
Total Expenses 8,637,000 - 692,150 7,944,850 450,850 300,000 3,184,000 4,010,000 - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 248,190 - 132,000 116,190 50,850 39,800 25,540 - - -
Fund Balance - - - - - - - - - -
Grants Awarded (Federal)1,378,810 - 560,150 818,660 400,000 260,200 158,460 - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 7,010,000 - - 7,010,000 - - 3,000,000 4,010,000 - -
Total Resources 8,637,000 - 692,150 7,944,850 450,850 300,000 3,184,000 4,010,000 - -
Sunset Trail,
Edmonds Ave NE to NE 10th St TIP #: 23-16.1
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This project will install a multi-use trail on the north side of NE Sunset Blvd from Edmonds Ave NE to NE 10th Street, planter between
the trail and the street, street lighting, retaining walls, and ADA upgrades. The scope of this project was previously included in the NE
Sunset Boulevard (SR 900) Corridor Improvements project (TIP #23-16) but was extracted in an effort to phase the project so that it
became more financially feasible for the City to complete within a reasonable timeframe.
To address area growth, this project will improve access to transit and the non-motorized facility network.
The Sunset Trail project received a Congestion Mitigation and Air Quality (CMAQ) grant in the amount of $1,378,810 for Design
($960,150)/ROW ($418,660) in 2022. The City advanced the Design funds so work can begin in 2023.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
1,627,000 7,010,000
46
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:2
Project Account #:122190
Planning Area:City Center
Street Classification:Principal Arterial
Project Length:0.23 mi
Funding Status:Fully Funded - CN
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Other 137,401 137,401 - - - - - - - -
Preliminary Engineering 1,392,116 1,392,116 - - - - - - - -
R-O-W (includes Admin)4,565,736 3,992,517 573,219 - - - - - - -
Construction 3,952,789 - 3,952,789 - - - - - - -
Construction Services 1,139,080 - 639,080 500,000 500,000 - - - - -
Total Expenses 11,187,123 5,522,035 5,165,088 500,000 500,000 - - - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation 2,945,536 222,869 2,222,667 500,000 500,000 - - - - -
Bonds / LID's Formed 8,241,587 5,299,166 2,942,421 - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources 11,187,123 5,522,035 5,165,088 500,000 500,000 - - - - -
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
Park Ave North Extension,
Logan Ave N to Southpark TIP #: 23-17
The project will extend Park Ave N to the north of Logan Ave N, to provide access to Southport and The Boeing Company. Improvements
include the construction of a railroad crossing, signal improvements, utility improvements, illumination installation, underground utility
relocation and landscaping. The project is funded by Local Revitalization Financing (LRF) and Mitigation funding.
To improve accessibility and address additional development growth in the South Lake Washington Revitalization Area.
Construction is currently underway.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
11,187,123 -
47
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:1
Project Account #:122195
Planning Area:City Center
Street Classification:Principal Arterial
Project Length:0.51 mi
Funding Status:Fully Funded - CN
Project Description:
Program Aspects: Maintenance and Preservation, Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 3,339,314 3,314,314 25,000 - - - - - - -
R-O-W (includes Admin)4,317,459 4,060,407 257,052 - - - - - - -
Construction 25,446,000 - 9,086,000 16,360,000 14,360,000 2,000,000 - - - -
Construction Services 3,736,275 26,834 1,000,000 2,709,441 2,209,441 500,000 - - - -
Total Expenses 36,839,049 7,401,556 10,368,052 19,069,441 16,569,441 2,500,000 - - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (Federal)19,074,850 5,600,000 3,260,559 10,214,291 9,214,291 1,000,000 - - - -
Grants Awarded (State)7,355,150 - 1,000,000 6,355,150 5,855,150 500,000 - - - -
Mitigation 10,409,049 1,801,556 6,107,493 2,500,000 1,500,000 1,000,000 - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources 36,839,049 7,401,556 10,368,052 19,069,441 16,569,441 2,500,000 - - - -
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
Rainier Ave Corridor Improvements Phase 4,
S 3rd St to NW 3rd Pl TIP #: 23-18
Phase 4 of the Rainier Ave Corridor Improvements will extend previous corridor improvements from S 3rd St to 1,000 feet north of Airport
Way (NW 3rd Pl). Project elements include extending southbound BAT lane from S 2nd St to S 3rd St, pedestrian improvements with street
scaping, High Intensity Activated Crosswalk (HAWK), transit facility upgrades, access management, and a segment of a regional ped/bike
path trail (Lake Washington Loop Trail) from Airport Way to 1,000 feet north of Airport Way.
To improve traffic operations, reduce collisions, and provide greater ease of non-motorized and transit-based travel.
A Surface Transportation Program (STP) grant in the amount of $2,600,000 was awarded (2014) for Design of Phase 4. Additional grants
received for the project include; (2018) STP $3,000,000 for Right-of-Way; (2018) STP $4,500,000, (2020) STP $4,793,000, (2021) WSDOT
Regional Mobility $2,000,000, and (2021) Transportation Improvement Board (TIB) $5,000,000 for Construction. The project also received
supplemental federal funding for the Construction phase in 2022 in the amount of $4,181,850 as well as an increase to the TIB funding
participation ($355,150). Construction is currently underway.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
36,839,049 -
48
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:30
Project Account #:
Planning Area:City Center
Street Classification:Principal Arterial
Project Length:0.76 mi
Funding Status:Candidate
Project Description:
Program Aspects: Maintenance and Preservation, Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 3,694,886 - - 3,694,886 1,000,000 2,694,886 - - - -
R-O-W (includes Admin)3,464,400 - - 3,464,400 - 1,732,200 1,732,200 - - -
Construction 16,474,430 - - 16,474,430 - - 2,474,430 10,000,000 4,000,000 -
Construction Services 2,000,000 - - 2,000,000 - - - 1,000,000 1,000,000 -
Total Expenses 25,633,716 - - 25,633,716 1,000,000 4,427,086 4,206,630 11,000,000 5,000,000 -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 25,633,716 - - 25,633,716 1,000,000 4,427,086 4,206,630 11,000,000 5,000,000 -
Total Resources 25,633,716 - - 25,633,716 1,000,000 4,427,086 4,206,630 11,000,000 5,000,000 -
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
Rainier Ave N Corridor Improvements Phase 5,
NW 3rd Pl to north city limits TIP #: 23-19
Phase 5 of the Rainier Ave Corridor Improvements will extend the improvements from NW 3rd Pl to the northern City limits. Project
elements include widening of sidewalks with streetscaping, adding pedestrian-scale illumination and planted buffer strips. There is excess
road capacity north of NW 3rd Pl (NB) where the project will remove one of the two NB lanes on Rainier Ave N. On the east side of
Rainier Ave S/N, a new multi-use trail will be installed (previously referred to as the Lake Washington Loop Trail Phase 5).
The project will separate pedestrians and bicyclists from the vehicular traffic, enhancing safety and encouraging residents to use active
transportation modes.
The City is seeking available funding for the project. Phase 4 of the Rainier Ave Corridor Improvements is currently in construction (TIP
#23-18).
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 25,633,716
49
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:33
Project Account #:122103
Planning Area:City Center
Street Classification:Collector
Project Length:0.3 mi
Funding Status:Partially Funded - PE
Project Description:
Program Aspects: Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 1,760,612 251,951 1,000,000 508,661 508,661 - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 11,250,000 - - 11,250,000 - 500,000 2,000,000 6,000,000 2,750,000 -
Construction Services 1,950,000 - - 1,950,000 - - - 1,200,000 750,000 -
Total Expenses 14,960,612 251,951 1,000,000 13,708,661 508,661 500,000 2,000,000 7,200,000 3,500,000 -
Source of Fund:
REET 1/2 166,122 - 74,523 91,599 91,599 - - - - -
B&O Tax 94,490 34,013 60,477 - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (Federal)1,500,000 217,938 865,000 417,062 417,062 - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 13,200,000 - - 13,200,000 - 500,000 2,000,000 7,200,000 3,500,000 -
Total Resources 14,960,612 251,951 1,000,000 13,708,661 508,661 500,000 2,000,000 7,200,000 3,500,000 -
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
Renton Connector,
S 2nd St to S 5th St TIP #: 23-20
The Renton Connector project will install a continuous non-motorized facility along Burnett Ave S between S 2nd St and S 5th St via
separated walkways, protected bicycle lanes (cycle track), and a multi-use path. This project will also include landscaped medians,
reconfigured public parking areas, curb ramp upgrades to ADA standards, and traffic signalization improvements.
To create a signature north-south non-motorized connection in the downtown core via a corridor for pedestrians and cyclists between
the Cedar River and the South Renton Transit Center to the South via S 7th St (TIP # 23-23). This becomes an essential link that connects
to the Cedar River Trail, Lake to Sound Trail, Lake Washington Loop Trail, and the Eastside Rail Corridor.
Transportation received Surface Transportation Program (STP) funding ($1,500,000) from the contingency list in 2019. Design is
currently underway.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
1,760,612 13,200,000
50
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:37
Project Account #:
Planning Area:Benson
Street Classification:Collector
Project Length:0.76 mi
Funding Status:Partially Funded - PE
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 25,000 - 25,000 - - - - - - -
Preliminary Engineering 600,000 - 400,000 200,000 200,000 - - - - -
R-O-W (includes Admin)80,000 - - 80,000 - 80,000 - - - -
Construction 2,500,000 - - 2,500,000 - - 1,500,000 1,000,000 - -
Construction Services - - - - - - - - - -
Total Expenses 3,205,000 - 425,000 2,780,000 200,000 80,000 1,500,000 1,000,000 - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 125,000 - 75,000 50,000 50,000 - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (State)500,000 - 350,000 150,000 150,000 - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 2,580,000 - - 2,580,000 - 80,000 1,500,000 1,000,000 - -
Total Resources 3,205,000 - 425,000 2,780,000 200,000 80,000 1,500,000 1,000,000 - -
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
SE 168th St Protected Bike Lanes,
108th Ave SE to 128th Ave SE TIP #: 23-21
This project will construct protected bike lanes on SE 168th St between 108th Ave SE and 128th Ave SE.
To install an east-west bike route that connects multiple community destinations and improves access to transit.
The City was awarded a $500,000 allocation in the 2021-2023 State Capital Budget. Staff is currently in the process of conducting additional
public outreach, including surveying of the adjacent property owners along SE 168th St, and may redefine scope based on community
feedback. *Funding shown in 2023/2024 will be programmed in a subsequent budget adjustment.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
625,000 2,580,000
51
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:27
Project Account #:123006
Planning Area:City Center
Street Classification:Principal Arterial
Project Length:0.7 mi
Funding Status:Partially Funded - PE
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 200,000 - 200,000 - - - - - - -
Preliminary Engineering 1,551,956 10,525 1,041,431 500,000 500,000 - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 17,150,000 - - 17,150,000 1,250,000 5,900,000 4,500,000 3,500,000 2,000,000
Construction Services - - - - - - - - - -
Total Expenses 18,901,956 10,525 1,241,431 17,650,000 500,000 1,250,000 5,900,000 4,500,000 3,500,000 2,000,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 411,206 2,543 358,663 50,000 50,000 - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (Federal)1,340,750 7,982 882,768 450,000 450,000 - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 17,150,000 - - 17,150,000 - 1,250,000 5,900,000 4,500,000 3,500,000 2,000,000
Total Resources 18,901,956 10,525 1,241,431 17,650,000 500,000 1,250,000 5,900,000 4,500,000 3,500,000 2,000,000
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
South 2nd Street Conversion Project,
Rainier Ave S to Main Ave S TIP #: 23-22
The South 2nd Street Conversion Project will convert the existing 4–lane one-way roadway to a roadway with one through-lane in each
direction between Main Ave South and Rainier Ave South. This project also includes pedestrian and bicycle facilities, traffic operations
improvements, and transit upgrades that will provide better traffic operation and circulation for all modes of transportation. Transit
facility upgrades include new RapidRide stops and a transit queue jump at the new traffic signal at the Shattuck intersection.
To improve multimodal mobility in and around the downtown core. This project also hopes to enhance downtown Renton as a
destination, while improving circulation and enhancing pedestrian safety. The intersection of S 2nd St and Burnett is a key connection to
the Renton Connector Project (TIP #23-20).
The City was awarded $1,340,750 in Surface Transportation Program (STP) funds for preliminary engineering in the PSRC Countywide
competition in 2018. Additional planning will occur before Design work begins in 2022. Construction estimates are preliminary and will
depend on the results of the additional planning work the City is conducting. *Funding shown in 2023 for Planning will be programmed in a
subsequent budget adjustment.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
1,751,956 17,150,000
52
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:7
Project Account #:122151
Planning Area:City Center
Street Classification:Minor Arterial
Project Length:1.13 mi
Funding Status:Funded - CN
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 885,000 11,803 873,197 - - - - - - -
R-O-W (includes Admin)100,000 - - 100,000 100,000 - - - - -
Construction 2,000,000 - - 2,000,000 985,000 1,015,000 - - - -
Construction Services 285,000 - - 285,000 165,000 120,000 - - - -
Total Expenses 3,270,000 11,803 873,197 2,385,000 1,250,000 1,135,000 - - - -
Source of Fund:
REET 1/2 635,000 - - 635,000 500,000 135,000 - - - -
B&O Tax 185,000 11,803 173,197 - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (Federal)1,450,000 - - 1,450,000 450,000 1,000,000 - - - -
Grants Awarded(SoundTran)1,000,000 - 700,000 300,000 300,000 - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources 3,270,000 11,803 873,197 2,385,000 1,250,000 1,135,000 - - - -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
South 7th Street Corridor Improvements,
Oakesdale Ave SW to Burnett Ave S TIP #: 23-23
This project develops S/SW 7th St as a key east-west bicycle route into the downtown: between Oakesdale Ave S and Burnett Ave S. This
project will install a multi-use path on S 7th St, between Shattuck and Burnett Ave S, and install intersection improvements at multiple
intersections along the corridor from Shattuck Ave S to Oakesdale Ave SW. The intersection improvements from Shattuck Ave S westward
along this corridor will improve bicycle facilities and intersection operations to provide upgraded signage to bicyclists and will help simplify
bicycle movements through complex intersections. Bicycle improvements include push-button activation, green bike lanes through
conflict/crossing zones, and pavement markings. This project will also upgrade an existing marked crosswalk with flashing beacons with
higher visibility technology.
To create a designated east-west ped/bike route through the City's commercial core and an important link between regional trails.
Phase 1 was completed which included a traffic signal and an eastbound right-turn lane at S 7th St/Shattuck Ave S. In 2019, Sound Transit
awarded $1,000,000 toward Design and Construction of the multi-use path between Talbot and Shattuck. In 2020, $1,450,000 of Surface
Transportation Program (STP) funds was awarded for FY 2024 for construction of the multi-use path between Shattuck and Burnett Ave S as
well as various intersection improvements. Design is currently underway.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
3,270,000 -
53
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:5
Project Account #:123003
Planning Area:City Center
Street Classification:Minor Arterial
Project Length:N/A
Funding Status:Funded - CN
Project Description:
Program Aspects: Maintenance and Preservation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 620,000 90,767 301,548 227,685 227,685 - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 2,143,700 - - 2,143,700 - 2,143,700 - - - -
Construction Services 350,000 - - 350,000 - 350,000 - - - -
Total Expenses 3,113,700 90,767 301,548 2,721,385 227,685 2,493,700 - - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 128,700 13,802 40,500 74,398 29,398 45,000 - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (Federal)2,985,000 76,965 261,048 2,646,987 198,287 2,448,700 - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources 3,113,700 90,767 301,548 2,721,385 227,685 2,493,700 - - - -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Williams Ave Bridge - Seismic Retrofit and Painting,
across Cedar River TIP #: 23-24
The project will remove the existing paint from the steel girders, repair corrosion damage and apply a new protective paint system. The
project will also perform a seismic analysis and retrofit along with other improvements. The Williams Ave Bridge was built by the City of
Renton in 1954. It is a three span bridge that crosses over the Cedar River. The main span is carried by steel girders. The girders are coated
with paint to protect the steel from corrosion. Corrosion causes section loss which results in a reduced load carrying capacity of the girders.
The existing paint is failing. The bridge is located in a zone of moderate to high liquefication susceptibility during seismic events.
To extend the service life of the Williams Ave Bridge and reduce seismic vulnerability.
In late 2017, the project was awarded a Federal Highway Administration (FHWA) grant of $2,985,000 to perform a seismic retrofit and
painting of the bridge. The project is currently in the design phase. Construction is anticipated for summer 2025.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
3,113,700 -
54
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:23
Project Account #:122117
Planning Area:Benson
Street Classification:Minor Arterial
Project Length:2.5 mi
Funding Status:Candidate
Project Description:
Program Aspects: Active Transportation, Plan Implementation and Compliance
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 1,689,000 - - 1,689,000 - 689,000 1,000,000 - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 1,689,000 - - 1,689,000 - 689,000 1,000,000 - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 1,689,000 - - 1,689,000 - 689,000 1,000,000 - - -
Total Resources 1,689,000 - - 1,689,000 - 689,000 1,000,000 - - -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
116th Ave SE Improvements,
SE 168th St to SE 160th St TIP #: 23-25
Widen roadway to provide a 3-lane roadway with bike lanes along 116th Ave SE and Edmonds Way SE, including new pavement, curb,
gutter, sidewalk, street lights, traffic signals, storm drainage, channelization and landscaping from Puget Drive SE to the southern City limits.
Benson Hill Community Plan recommended improvements for a first phase, based on the neighborhood needs. The priority, cost and
schedule for the phased improvements will be determined based on available funding.
Improvements will enhance vehicular, bicycle and pedestrian safety along this important north-south transportation corridor.
Transportation has received $1,000,000 in funding to construct sidewalks near the Family First Center (TIP #23-04.1). Staff is continuing to
look for grant opportunities for the larger project. Programmed funding is for Preliminary Engineering only.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 1,689,000
55
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:24
Project Account #:122920
Planning Area:Talbot, Benson
Street Classification:Principal Arterial
Project Length:1.87 mi
Funding Status:Candidate
Project Description:
Program Aspects: Maintenance and Preservation, Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 200,000 - - 200,000 - 200,000 - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 200,000 - - 200,000 - 200,000 - - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 200,000 - - 200,000 - 200,000 - - - -
Total Resources 200,000 - - 200,000 - 200,000 - - - -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Carr Road Improvements,
Davis Ave S to 109th Ave SE TIP #: 23-26
This project would design needed infrastructure improvements on Carr Road, from Valley Medical Center past the SR 515/108th Ave SE
intersection. Potential improvements vary from roadway realignment/widening at several locations to address geometric deficiencies,
widening to 5-lane roadway (2 lanes westbound, 3 lanes eastbound), pavement restoration/reconstruction including bicycle lanes on new
alignment.
Improvements are necessary to enhance vehicle traffic capacity and safety for vehicles, bicycles, and pedestrians on this major east-west
transportation corridor.
A corridor study prepared by King County in 2003 identified the need for roadway improvements from the Lind Ave SW and SW 43rd St
intersection extending east and crossing SR 167 and ending at 116th Ave SE. Previous expenditures were for corridor signal upgrades
associated with a federal grant. Future roadway improvement options include spot safety improvements, bicycle and pedestrian
improvements, roadway widening and roadway on new alignment. Programmed estimates are for Planning only.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 200,000
56
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:38
Project Account #:
Planning Area:City Center
Street Classification:Principal Arterial
Project Length:N/A
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 750,000 - 750,000 - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 750,000 - 750,000 - - - - - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (State)750,000 - 750,000 - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources 750,000 - 750,000 - - - - - - -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Grady Way & Rainier Ave Intersection Improvements TIP #: 23-27
The project will be a coordinated effort between the City of Renton and WSDOT and will make the following improvements; provide grade
separation of one eastbound and one westbound lane of Grady Way South over SR167, construct an additional right turn lane from
eastbound Grady Way South to southbound SR 167, construct new curbs, gutters, storm drainage and sidewalk improvements and; install
Transit Signal Priority through the intersection of SR 167 & Grady Way South.
The project will provide a connection point to the Rainier Avenue transit corridor which leads to Renton’s key regional growth centers -
downtown and Southport/The Landing.
The City received $750,000 in the State Transportation Budget in 2023 for Planning. Additional planning work is needed to determine if the
current scope is the best alternative for improving access to the new South Renton Transit Center. Additional funding sources have yet to be
identified. Programmed funding is for Planning only. Total project cost is estimated at $55M.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
750,000 -
57
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:42
Project Account #:
Planning Area:East Plateau
Street Classification:Collector
Project Length:0.42 mi
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 50,000 50,000 - - - - - - - -
Preliminary Engineering 500,000 - - 500,000 - - 500,000 - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 1,500,000 - - 1,500,000 - - - 1,000,000 500,000 -
Construction Services - - - - - - - - - -
Total Expenses 2,050,000 50,000 - 2,000,000 - - 500,000 1,000,000 500,000 -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 50,000 50,000 - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 2,000,000 - - 2,000,000 - - 500,000 1,000,000 500,000 -
Total Resources 2,050,000 50,000 - 2,000,000 - - 500,000 1,000,000 500,000 -
Hoquiam Ave NE Non-Motorized Improvements,
NE 10th Pl to NE Sunset Blvd TIP #: 23-28
*Picture: Shows existing narrow shoulders along Hoquiam Ave, north of NE 12th St.
Project Expenditures & Resources TOTAL Programmed Six-Year Program
This project would improve the experience for people walking and biking along Hoquiam Ave NE between NE 10th Pl and NE Sunset Blvd by
installing a walkway where needed and improving crossings.
Improve the experience for people walking and biking along Hoquiam Ave NE between NE 10th Pl and NE Sunset Blvd.
A feasibility study to evaluate constructability requirements and to address environmental challenges was complete in May 2022. The
preferred alternative may be a good candidate for Safe Routes to School-type grants. Project will be on hold until construction funding is
identified.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
50,000 2,000,000
58
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:50
Project Account #:
Planning Area:City Center
Street Classification:varies
Project Length:0.36 mi
Funding Status:Candidate
Project Description:
Program Aspects: Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 220,000 - - 220,000 - - - 220,000 - -
R-O-W (includes Admin)165,000 - - 165,000 - - - - 165,000 -
Construction 1,802,000 - - 1,802,000 - - - - - 1,802,000
Construction Services - - - - - - - - - -
Total Expenses 2,187,000 - - 2,187,000 - - - 220,000 165,000 1,802,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 2,187,000 - - 2,187,000 - - - 220,000 165,000 1,802,000
Total Resources 2,187,000 - - 2,187,000 - - - 220,000 165,000 1,802,000
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Houser Way Non-Motorized Improvements,
Mill Ave S to Bronson Way S TIP #: 23-29
This project would install a separated bike facility on the north side of Houser Way S/N, between Mill Ave S. and Bronson Way N.
Intersection crossings would be improved at Cedar River Park Drive and Mill Ave S. The project will include planning and pavement overlay,
channelization, and intersection crossing improvements. For feasibility and constructability issues, the roadway and pedestrian bridge
sections would not be part of this project. The feedback during the public engagement process for the Trails and Bicycle Master Plan update
identified Houser Way as the route for the Eastside Rail Corridor alignment. With the development of the Civic Core Plan, development of
this section of the bicycle network creates an important connection point for bicycle traffic between the north and south portions of the
City's urban growth center.
To create a bike facility that creates a connection to the Cedar River Trail and downtown. The crossing at Cedar River Park Drive is a
connection point for people connecting from Liberty Park to the Renton Community Center.
This project is pending available funding but is also subject to the schedule of the Houser Way Bridge - Seismic Retrofit and Painting project
(TIP #23-15) and the redevelopment of the 200 Mill site.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 2,187,000
59
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:55
Project Account #:
Planning Area:City Center
Street Classification:Minor Arterial
Project Length:0.57 mi
Funding Status:Candidate
Project Description:
Program Aspects: Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 100,000 - - 100,000 - - - - 100,000 -
Preliminary Engineering 1,000,000 - - 1,000,000 - - - - - 1,000,000
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 1,100,000 - - 1,100,000 - - - - 100,000 1,000,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 1,100,000 - - 1,100,000 - - - - 100,000 1,000,000
Total Resources 1,100,000 - - 1,100,000 - - - - 100,000 1,000,000
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Houser Way North Shared Use Path,
N 8th St to Lake Washington Blvd TIP #: 23-30
This project will develop a shared use path along the east side of Houser Way from Lake Washington Boulevard N to the existing shared use
path on N 8th St.
To create an established bicycle facility connecting the Eastside Rail Corridor to the downtown core.
This project was originally a widening and realignment project. The scope was changed to align with the Trails and Bicycle Master Plan and
is subject to available funding. A public engagement process would be required during design to ensure involvement of surrounding
businesses. Programmed estimates are for Planning and Design only.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 1,100,000
60
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:52
Project Account #:120024
Planning Area:Valley
Street Classification:Principal Arterial
Project Length:0.73 mi
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety, Plan Implementation and Compliance
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 200,000 - - 200,000 - - - - 200,000 -
Preliminary Engineering 1,300,000 - - 1,300,000 - - - - - 1,300,000
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 1,500,000 - - 1,500,000 - - - - 200,000 1,300,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 1,500,000 - - 1,500,000 - - - - 200,000 1,300,000
Total Resources 1,500,000 - - 1,500,000 - - - - 200,000 1,300,000
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Lind Ave SW Roadway Widening,
SW 16th St to SW 34th St TIP #: 23-31
Widen existing roadway to five lanes where required. Includes new roadway, curbs, sidewalks, drainage, signals, lighting, signing and
channelization. Additionally, these improvements address demands resulting from an interchange at Lind Ave SW which is included in the
WSDOT I-405 Master Plan (currently unfunded). A potential project could be a signal at the intersection at Lind Ave SW and SW 34th St
which is currently unsignalized.
To increase the capacity of this major north/south arterial to meet increasing traffic demands in the Valley due in part to development.
In 2020, a subarea TOD study for the South Grady/north Valley area was begun. This roadway is critical for the I-405 Master Plan and may
be important for any future light rail planning for the city. Programmed estimates are for Planning and Preliminary Engineering only.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 1,500,000
61
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:10
Project Account #:
Planning Area:Citywide
Street Classification:varies
Project Length:varies
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 50,000 - - 50,000 50,000 - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 750,000 - - 750,000 - 150,000 150,000 150,000 150,000 150,000
Construction Services - - - - - - - - - -
Total Expenses 800,000 - - 800,000 50,000 150,000 150,000 150,000 150,000 150,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 800,000 - - 800,000 50,000 150,000 150,000 150,000 150,000 150,000
Total Resources 800,000 - - 800,000 50,000 150,000 150,000 150,000 150,000 150,000
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Local Road Safety Plan Implementation TIP #: 23-32
This program would design and construct improvements identified in the Local Road Safety Plan. An adopted plan is created from analyzing
the data of the fatal and serious injury crashes in the city and the conditions that exist when those crashes occurred. A prioritized list of
projects are developed by a set of criteria after analyzing the data.
To address and mitigate or reduce the risk of fatal or serious injury crashes.
The City's Local Road Safety Plan was adopted in 2022. The City is working with a consultant on the next step in the process, which is
developing a Safer Mobility Action Plan. Plan implementation will be contingent on available funding. Staff is currently looking for grant
opportunites.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 800,000
62
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:51
Project Account #:122303
Planning Area:City Center
Street Classification:Principal Arterial
Project Length:0.76 mi
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 200,000 - - 200,000 - - - 200,000 - -
Preliminary Engineering 3,500,000 - - 3,500,000 - - - - 1,500,000 2,000,000
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 3,700,000 - - 3,700,000 - - - 200,000 1,500,000 2,000,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 3,700,000 - - 3,700,000 - - - 200,000 1,500,000 2,000,000
Total Resources 3,700,000 - - 3,700,000 - - - 200,000 1,500,000 2,000,000
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Logan Ave North Improvements,
S 2nd St to Park Ave N TIP #: 23-33
Phase 1 (Cedar River Bridge to N 6th St) is complete. Phase 2 (N 6th St to Park Ave N) will add a NB lane, new curb, gutter, sidewalks (on the
east side), landscaped buffer, and a pedestrian/bicycle trail (west side), streetlights, pedestrian scale illumination, crosswalks,
channelization.
The increase in traffic and the new RapidRide transit have warranted widening to add a northbound lane. Included with the improvements
are urban roadway amenities to implement "Complete Streets" practice per City code.
Project continues to be on hold until the Boeing Company is in a position to dedicate right-of-way to the project. Planning studies would
have to be conducted to analyze if intersection improvements are required to adjust for current traffic conditions. Programmed estimates
shown are for Planning and Preliminary Engineering phases.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 3,700,000
63
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:46
Project Account #:
Planning Area:Cedar River
Street Classification:Principal Arterial
Project Length:N/A
Funding Status:Candidate
Project Description:
Program Aspects: Maintenance and Preservation, Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 522,970 - - 522,970 - - 299,035 223,935 - -
R-O-W (includes Admin)156,300 - - 156,300 - - - 156,300 - -
Construction 2,458,630 - - 2,458,630 - - - 619,765 1,000,000 838,865
Construction Services - - - - - - - - - -
Total Expenses 3,137,900 - - 3,137,900 - - 299,035 1,000,000 1,000,000 838,865
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 3,137,900 - - 3,137,900 - - 299,035 1,000,000 1,000,000 838,865
Total Resources 3,137,900 - - 3,137,900 - - 299,035 1,000,000 1,000,000 838,865
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Maple Valley Highway Barriers,
SE 5th St to approximately 1800 feet west of intersection TIP #: 23-34
This project includes two barriers: One is to install a concrete median barrier between east and westbound travel lanes of the SR 169 S-
Curve between the Riviera Apartments and S. 5th Street including associated roadway widening to add the barrier. The second barrier
improvement will remove the existing concrete barrier end treatment located eastbound (east of the Riviera Apartments) and replace with
2 new concrete barriers extending west.
Maple Valley Highway (SR 169) is a principal arterial carrying 44,000 vehicles per day. This project will improve safety for traffic on Maple
Valley Highway (SR 169) at this location, which has been the site of numerous collision impacts.
The design report for the Cedar River half bridge is complete and was funded by the Roadway Safety and Guardrail Program (TIP # 23-05).
Final design and construction is pending funding availability.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 3,137,900
64
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:48
Project Account #:
Planning Area:Valley
Street Classification:Principal Arterial
Project Length:2.2 mi
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 500,000 - - 500,000 - - 500,000 - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 500,000 - - 500,000 - - 500,000 - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 500,000 - - 500,000 - - 500,000 - - -
Total Resources 500,000 - - 500,000 - - 500,000 - - -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Monster Rd SW/68th Ave S Roadway Improvements TIP #: 23-35
Widen existing roadway to four lanes plus two-way-left-turn-lane where needed and bike lanes. Realign Beacon Coal Mine Road approach
to intersection with the Monster Road SW roadway. Includes new roadway, curbs, sidewalk, drainage, street lighting, traffic signals,
channelization, retaining walls and widening the existing bridge.
Will serve growing north-south traffic demand and help provide another truck route into the city.
Phase 1 of improvements will address drainage problems between the Monster Rd Bridge and the City limits. A preliminary design study
was completed in 1999. The project cost is estimated at $32M, with the City's share estimated at $13M and King Co. at $19M at the time.
Scope, cost and implementation schedule to be determined. Programming includes planning studies only to scope of possible phased
implementation in coordination with King County.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 500,000
65
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:16
Project Account #:
Planning Area:City Center
Street Classification:Collector
Project Length:N/A
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 20,000,000 - - 20,000,000 - 7,500,000 10,000,000 2,500,000 - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 20,000,000 - - 20,000,000 - 7,500,000 10,000,000 2,500,000 - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 20,000,000 - - 20,000,000 - 7,500,000 10,000,000 2,500,000 - -
Total Resources 20,000,000 - - 20,000,000 - 7,500,000 10,000,000 2,500,000 - -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
N 8th St Direct Access Ramps TIP #: 23-36
This project would be part of the I405 Implementation Plan to achieve a successful Regional Bus Rapid Transit (BRT) network and improve
transit service utilization.
Direct access ramps at North 8th Street would provide improved access to the neighborhoods west of I-405: residential neighborhoods
within the City Center (North Renton and South Renton), West Hill, south Seattle, and unincorporated King County. These direct access
ramps would not only improve access to businesses such as, The Boeing Company, PACCAR Inc., and SECO Development, but also would help
decrease congestion in other parts of the City that need access to I-405.
The 2022 Legislature approved a substantial "Move Ahead Washington" transportation package that included the N 8th St Direct Access
Ramp project ($245,000,000). The City is awaiting updates as the project moves forward in the legislative process. Programmed funding
includes Preliminary Engineering only.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 20,000,000
66
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:43
Project Account #:122176
Planning Area:Highlands, East Plateau
Street Classification:Principal Arterial
Project Length:0.92 mi
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 100,000 - - 100,000 - - - 100,000 - -
Preliminary Engineering 4,982,500 - - 4,982,500 - - - 200,000 2,000,000 2,782,500
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 5,082,500 - - 5,082,500 - - - 300,000 2,000,000 2,782,500
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 5,082,500 - - 5,082,500 - - - 300,000 2,000,000 2,782,500
Total Resources 5,082,500 - - 5,082,500 - - - 300,000 2,000,000 2,782,500
Project Expenditures & Resources TOTAL Programmed Six-Year Program
NE 3rd Street Corridor Improvements,
Sunset Blvd N to Jefferson Ave NE TIP #: 23-37
This project involves a series of improvements in this corridor to improve traffic operations such as rechannelization and traffic signal
modifications, possible transit priority signal treatments and queue jumps.
To improve traffic operations for all modes of transportation, especially addressing the needs of transit, bicycle and pedestrian traffic.
This corridor has a strong potential for transit usage and is experiencing rapid residential and retail growth. The NE 3rd/4th Corridor Study
was adopted in May 2005. Funding will need to be identified to conduct a renewed public engagement process and redefine/reconfirm
project scope. Programmed estimates are for Planning and Preliminary Engineering only.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 5,082,500
67
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:44
Project Account #:
Planning Area:Highlands, East Plateau
Street Classification:Principal Arterial
Project Length:1.05 mi
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 100,000 - - 100,000 - - - - - 100,000
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 100,000 - - 100,000 - - - - - 100,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 100,000 - - 100,000 - - - - - 100,000
Total Resources 100,000 - - 100,000 - - - - - 100,000
Project Expenditures & Resources TOTAL Programmed Six-Year Program
NE 4th Street Corridor Improvements,
Jefferson Ave NE to Duvall Ave NE TIP #: 23-38
This project involves a series of improvements to traffic operations such as rechannelization and traffic signal modifications, possible transit
priority signal treatments and queue jumps. This project also may include a new signal at NE 4th St and Bremerton Ave NE, if warranted by
development.
To improve traffic operations for all modes of transportation, especially addressing the needs of transit, bicycle and pedestrian traffic.
The NE 3rd/4th Corridor Study was adopted in May 2005. Funding will need to be identified to conduct a renewed public engagement
process and redefine/reconfirm project scope. Programmed estimates are for Planning only.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 100,000
68
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:53
Project Account #:
Planning Area:Highlands
Street Classification:Principal Arterial
Project Length:0.70 mi
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 100,000 - - 100,000 - - 100,000 - - -
Preliminary Engineering 5,480,000 - - 5,480,000 - - - 2,500,000 1,490,000 1,490,000
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 5,580,000 - - 5,580,000 - - 100,000 2,500,000 1,490,000 1,490,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 5,580,000 - - 5,580,000 - - 100,000 2,500,000 1,490,000 1,490,000
Total Resources 5,580,000 - - 5,580,000 - - 100,000 2,500,000 1,490,000 1,490,000
Project Expenditures & Resources TOTAL Programmed Six-Year Program
NE Sunset Blvd Transit and Access Improvements,
Union Ave NE to Hoquiam Ave NE TIP #: 23-39
This project would address transit and traffic operational needs through key improvements such as channelization, traffic signal
modifications, signal treatments, possible queue jumps, access management through installation of medians. This project would also
include EB right turn only lanes at Elma Pl NE and Hoquiam Ave NE.
Improve traffic operations and safety.
This project focuses on the eastern end of SR 900 around Duvall and prepares for potential upgrade of Metro route 240 to bus rapid transit
service. Programmed estimates are for Planning and Preliminary Engineering only.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 5,580,000
69
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:25
Project Account #:123004
Planning Area:East Plateau
Street Classification:Collector
Project Length:1.16 mi
Funding Status:Candidate
Project Description:
Program Aspects: Maintenance and Preservation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 750,000 - - 750,000 - - 250,000 500,000 - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 6,000,000 - - 6,000,000 - - - - 3,000,000 3,000,000
Construction Services - - - - - - - - - -
Total Expenses 6,750,000 - - 6,750,000 - - 250,000 500,000 3,000,000 3,000,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 6,750,000 - - 6,750,000 - - 250,000 500,000 3,000,000 3,000,000
Total Resources 6,750,000 - - 6,750,000 - - 250,000 500,000 3,000,000 3,000,000
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Nile Ave NE Bridge Replacement,
across May Creek TIP #: 23-40
The Nile Ave NE Bridge was built by King County in 1951. Ownership was transferred to the City in 2009 as part of the MacKay Annexation
(Ord #5456). It is a single span bridge that crosses over May Creek. The initial phase of this project will evaluate replacement options with a
type, size and location (TS&L) study.
The bridge is 20 years beyond its original design life of 50 years. It will very likely need to be replaced or significantly retrofitted within the
next 10 years. The main span is comprised of precast concrete girders. The girders are supported on treated timber piles with timber caps.
Some of the timber piles are showing signs of deterioration.
To date the project has not received grant funding for replacement. However, with a TS&L study, the City will be in a very good position to
apply for Federal Highway Administration (FHWA) funding when the bridge condition qualifies for replacement funding. The City plans to
move forward with the TS&L study in 2026.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 6,750,000
70
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:31
Project Account #:
Planning Area:Cedar River
Street Classification:Principal Arterial
Project Length:
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 3,650,000 - - 3,650,000 - 1,650,000 2,000,000 - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 7,710,595 - - 7,710,595 - - - 5,000,000 2,710,595 -
Construction Services 1,500,000 - - 1,500,000 - - - 1,000,000 500,000 -
Total Expenses 12,860,595 - - 12,860,595 - 1,650,000 2,000,000 6,000,000 3,210,595 -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 12,860,595 - - 12,860,595 - 1,650,000 2,000,000 6,000,000 3,210,595 -
Total Resources 12,860,595 - - 12,860,595 - 1,650,000 2,000,000 6,000,000 3,210,595 -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Renton-Maple Valley Highway & 140th Way SE TIP #: 23-41
The Renton-Maple Valley Highway & 140th Way SE intersection experiences significant congestion and queuing during the afternoon
commute and the City has identified a need to improve traffic operations at this intersection. A consultant prepared an analysis that
evaluates two improvement options to add a second west bound left turn lane at the intersection.
Renton-Maple Valley Highway is an important principal arterial connecting Downtown Renton and I-405 with neighborhoods and other
cities to the east and south. Renton-Maple Valley Highway is designated as State route 169 and is controlled by WSDOT, changes to the
roadway require WSDOT approval.
Staff is working to review the two proposed improvement options as prepared by the Consultant. Project is awaiting available funding. Total
estimated project cost is $13M.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 12,860,595
71
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:54
Project Account #:
Planning Area:City Center
Street Classification:Principal Arterial
Project Length:0.37 mi
Funding Status:Other-Led by Others
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 2,300,000 - - 2,300,000 - - - 300,000 1,000,000 1,000,000
Construction Services - - - - - - - - - -
Total Expenses 2,300,000 - - 2,300,000 - - - 300,000 1,000,000 1,000,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 2,300,000 - - 2,300,000 - - - 300,000 1,000,000 1,000,000
Total Resources 2,300,000 - - 2,300,000 - - - 300,000 1,000,000 1,000,000
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Renton Bus Rapid Transit (BRT) Improvements,
S Renton Village Pl extension to S Grady Way TIP #: 23-42
New transit access road improvements from I-405 exit 3 (Talbot Rd) to South Renton Transit Center. Includes reconfiguration of Grady Way,
Lake Ave S and S Renton Village Place to accommodate transit.
With current traffic conditions and configurations, improvements will be needed to ensure speed and reliability of the BRT system into and
out of the South Renton Transit Center. This transit hub is currently and will remain a key connection point for transit users for both Metro
and Sound Transit. Proximity to the Sounder Station and future increase of parking availability also plays a key role in improving accessibility
needs.
Estimated cost in Regional Transportation Plan is $23,856,858. Design and Construction should be implemented and coordinated with
South Renton Transit Center, development of Renton Village, and implementation of I-405 Bus Rapid Transit. Project completion year falls
outside the 6 years of the TIP.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 2,300,000
72
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:28
Project Account #:
Planning Area:City Center
Street Classification:Principal Arterial
Project Length:0.55 mi
Funding Status:Candidate
Project Description:
Program Aspects: Active Transportation, Plan Implementation and Compliance
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 4,000,000 - - 4,000,000 - - 500,000 1,700,000 1,500,000 300,000
R-O-W (includes Admin)100,000 - - 100,000 - - - - - 100,000
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 4,100,000 - - 4,100,000 - - 500,000 1,700,000 1,500,000 400,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 4,100,000 - - 4,100,000 - - 500,000 1,700,000 1,500,000 400,000
Total Resources 4,100,000 - - 4,100,000 - - 500,000 1,700,000 1,500,000 400,000
Project Expenditures & Resources TOTAL Programmed Six-Year Program
South 3rd Street Conversion Project,
Rainier Ave S to Main Ave S TIP #: 23-43
The project provides pedestrian and bicyclist facilities and enhancements, traffic operation and circulation improvements in Downtown. The
improvements include adding raised intersections with bulb outs, parklets, pedestrian plaza, lighting, street furniture, streetscape, bicycle
Blvd., bike racks, signage, wayfinding and converting S 3rd St to two-way operations.
This project is one of the strategies identified in the City Center Community Plan and the Downtown Civic Core Plan. The project enhances
downtown Renton as a destination area, while improving circulation, reducing traffic speeds and enhancing pedestrian safety. A feasibility
study, including a Downtown Circulation Traffic Analysis for the conversion to two-way operations was completed.
This project will continue downtown improvements, further enhancing the pedestrian and bicyclist environment. Project is pending future
grant funding availability. Total estimated project cost is $21M. Programmed estimates are for Preliminary Engineering and ROW.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 4,100,000
73
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:47
Project Account #:
Planning Area:City Center
Street Classification:Principal Arterial
Project Length:1.16 mi
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 100,000 - - 100,000 - - - - 100,000 -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 100,000 - - 100,000 - - - - 100,000 -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 100,000 - - 100,000 - - - - 100,000 -
Total Resources 100,000 - - 100,000 - - - - 100,000 -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
South Grady Way Multi-Modal Improvements,
Rainier Ave S to Talbot Rd South TIP #: 23-44
The project will remove the islands at the intersections of S Grady Way with Lake Ave S and Shattuck Ave S, to allow for a continuous
eastbound lane from Rainier Ave S to Talbot Rd S. Included are modifications to traffic signals, new pedestrian crossings and channelization.
This project will perform a comprehensive analysis of multi-modal transportation improvements, including review of potential transit
improvements along Grady Way, such as Business Access and Transit (BAT) lanes and Traffic Signal Priority (TSP).
To improve speed and reliability of transit, improve traffic operations at intersections for all modes, and ease congestion in the Downtown.
Project is pending future grant funding availability. The Rapid Ride I Line will implement a portion of this work. Reassessment should occur
after construction. Estimated project cost is $6.5M. Programmed estimates are for Planning only.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 100,000
74
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:40
Project Account #:123005
Planning Area:Citywide
Street Classification:varies
Project Length:N/A
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 500,000 - - 500,000 - - 250,000 250,000 - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 500,000 - - 500,000 - - 250,000 250,000 - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 500,000 - - 500,000 - - 250,000 250,000 - -
Total Resources 500,000 - - 500,000 - - 250,000 250,000 - -
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
Transit Master Plan TIP #: 23-45
The plan establishes scalable short- and long-term strategies, and identifies projects that will foster a high-quality transit system to meet
Renton’s needs. Transportation staff have worked on and are currently working on multiple transit projects such as the Renton Access to
Transit Study (King County 2019 Proviso), Renton-Kent-Auburn Mobility Plan (RKAAMP), Rapid Ride I-Line, and Sound Transit I-405 BRT
(Stride).
The Transit Master Plan provides the city with a means to influence decisions made by regional transit authorities. It also provides a basis
on which to begin advancing proposed capital projects for further study, design and prioritization, and position them to be strong
competitors for grant funding.
Metro updated their guiding documents, Service Guidelines and METRO CONNECTS in 2021. This work would be to adjust to the new
regional transit vision to ensure the needs of Renton are met.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 500,000
75
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:41
Project Account #:122903
Planning Area:City Center
Street Classification:varies
Project Length:1.6 mi
Funding Status:Other-Led by Others
Project Description:
Program Aspects: Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses - - - - - - - - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources - - - - - - - - - -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Lake to Sound (L2S) Trail,
Black River Riparian Forest to Cedar River TIP #: 23-46
The Lake to Sound (L2S) Trail is a joint partnership between the cities of Renton, SeaTac, Tukwila, Burien and Des Moines, in coordination
with King County. The 17-mile L2S Trail will provide an east-west connection between the shoreline of Lake Washington (Renton) and the
shoreline of Puget Sound (Des Moines). Phase A goes from Naches Ave SW (Renton) to Fort Dent Park (Tukwila). The length between
Naches Ave SW and Mill Ave S are future phases. Construction of Phase A (Naches Ave SW to Fort Dent Park in Tukwila) was completed in
early 2020.
Phase A connects Fort Dent (Tukwila) to the larger system of regional trails in South King County, including the Green River Trail, the
Interurban Trail and the Cedar River Trail. Phase A provides a 12-foot wide asphalt paved multi-use trail, with 2-foot gravel shoulders. In the
Downtown Civic Core Plan, the L2S Trail connects to the Eastside Rail Corridor (ERC) and the Renton Connector (TIP #23-20).
City staff will be developing scope, cost and schedule for future phases. Alignment within BNSF would require King County to purchase ROW
and new bridges to cross roadways. An alignment on S 7th Street (TIP #23-23) can be developed as a reasonable alternative or parallel
route as a trail within railroad ROW is developed. Pending available funding.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- -
76
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:57
Project Account #:
Planning Area:City Center
Street Classification:Principal Arterial
Project Length:N/A
Funding Status:Other-Led by Others
Project Description:
Program Aspects: Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses - - - - - - - - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources - - - - - - - - - -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
South Lake Washington Transit Hub,
vicinity of Southport Dr N and Garden Ave N TIP #: 23-47
This project will implement a Rapid Ride Bus Transit Station in the vicinity of Park Ave. N and Garden Ave N. The project would include the
kit of parts associated for a Rapid Ride stop such as weather protection, lighting, seating, and litter receptacles.
The project is proposed to meet recent travel demand growth in the area and as a part of the connectivity of the regional transit system.
This transit hub will provide service to Southport and other new development in the area which includes two hotels. In addition, a large
manufacturing company's employees will benefit from the transit hub's location as well as visitors to The Landing and the 57-acre Gene
Coulon Park.
This project is pending available funding and coordination with King County Metro.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- -
77
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:56
Project Account #:
Planning Area:City Center
Street Classification:Local
Project Length:0.15 mi
Funding Status:Other-Led by Others
Project Description:
Program Aspects: Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses - - - - - - - - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources - - - - - - - - - -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Southport Pedestrian Connection TIP #: 23-48
A pedestrian path underneath the BNSF trestle that connects into Southport. The repair/rebuild of the trestle, and other associated work, is
funded by LRF which is programmed within the Park Ave N Extension project (TIP #23-17).
To create a pedestrian connection from Lake Washington Boulevard to the boardwalk in Southport.
This project would be designed, constructed, and funded by the developer.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- -
78
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:49
Project Account #:
Planning Area:Valley
Street Classification:Minor Arterial
Project Length:1.27 mi
Funding Status:Other-Led by Others
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses - - - - - - - - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources - - - - - - - - - -
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
SW 27th Street/Strander Boulevard Connection TIP #: 23-49
The project will provide a grade-separated crossing at the Union Pacific Railroad (UPRR) and Burlington Northern Santa Fe (BNSF)
railroad tracks. Bicycle and pedestrian connections will be provided to the Tukwila Station and the Interurban Trail. Phase 1 - Seg 2a - 2
lane roadway from Naches Ave SW to the Sounder Station, including a BNSF bridge has been completed.
A new east-west arterial roadway will connect the cities of Renton and Tukwila and provide significant congestion relief to existing
arterials. The new road will provide access to the Tukwila Train/Sound Transit Station.
The City of Tukwila had taken the lead for future phases, however, Tukwila City Council voted unanimously in 2019 to terminate their
efforts to manage the next phase of the Strander Blvd. Improvements due to multiple issues including rising project costs that had
surpassed sustainable funding levels for local jurisdictions to be the lead on.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- -
79
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:14
Project Account #:123011
Planning Area:Kennydale
Street Classification:Collector
Project Length:
Funding Status:Other-Led by Others
Project Description:
Program Aspects: Plan Implementation and Compliance
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 37,641 32,500 5,141 - - - - - - -
Preliminary Engineering 1,500,000 - - 1,500,000 1,500,000 - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 18,500,000 - - 18,500,000 500,000 2,000,000 8,000,000 8,000,000 - -
Construction Services - - - - - - - - - -
Total Expenses 20,037,641 32,500 5,141 20,000,000 2,000,000 2,000,000 8,000,000 8,000,000 - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 37,641 32,500 5,141 - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 20,000,000 - - 20,000,000 2,000,000 2,000,000 8,000,000 8,000,000 - -
Total Resources 20,037,641 32,500 5,141 20,000,000 2,000,000 2,000,000 8,000,000 8,000,000 - -
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
NE 44th Street/I-405 Park and Ride TIP #: 23-50
This project will construct a Park and Ride adjacent to the Sound Transit NE 44th Street/I-405 Stride inline transit station. The park and
ride will be constructed with approximately 200 stalls plus amenities such as bike lockers. A boardwalk will also be constructed to
connect the park and ride to the sidewalks along NE 44th Street leading to the in-line station.
New high capacity transit SRIDE service will begin in 2026 connecting regional growth centers along the I-405 corridor between
Lynnwood and Burien with 2 stations in Renton. In order to provide adequate access to the station at NE 44th Street the construction of
a park and ride is critical given its location and lack of local transit access.
The project received $258,000 for the pedestrian boardwalk as part of the 2022 supplemental state capital budget. The City is working to
execute an agreement with Sound Transit to secure the construction funding. Final estimates are still in development. Current opinion of
cost is $20M.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
37,641 20,000,000
80
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:32
Project Account #:332084
Planning Area:City Center
Street Classification:varies
Project Length:1 mi
Funding Status:Other-Led by Others
Project Description:
Program Aspects: Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 6,000,000 - 6,000,000 - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 6,000,000 - 6,000,000 - - - - - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (State)6,000,000 - 6,000,000 - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources 6,000,000 - 6,000,000 - - - - - - -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Eastrail TIP #: 23-51
Project will be coordinated by King County Department of Natural Resources and Parks and BNSF for acquisition of property rights, then
design and construction of the Eastrail between Milepost 5 and Southport/South Coulon Park access road.
A coalition of King and Snohomish counties, multiple cities, Sound Transit, PSE, and the non-profit 'Eastrail Partners' that includes SECO
Development and others are working to construct a continuous 42-mile "Eastrail" along BNSF trackage between Renton and South
Snohomish County. One of the key gaps is in Renton, where the existing Eastrail terminates at Milepost 5, just north of the north vehicle
entrance to Coulon Park. Extending the trail offers opportunities for Eastrail users to connect to employment centers and regional trails
such as the Cedar River Trail, Lake to Sound Trail, Lake WA Loop Trail and other shared-use paths within Renton.
The project was allocated $6,000,000 in funding through the Move Ahead Washington budget package for pedestrian and bike safety
projects. Project completion year falls outside the 6 years of the TIP. Programmed funding is for Planning only.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
6,000,000 -
81
AGENDA ITEM # 10. a)
PROJECT
Priority Rank:
Project Account #:122102
Planning Area:Kennydale
Street Classification:Collector
Project Length:N/A
Funding Status:Partially Funded - CN
Project Description:
Program Aspects: Plan Implementation and Compliance
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 57,700 - 57,700 - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 410,000 - - 410,000 410,000 - - - - -
Construction Services - - - - - - - - - -
Total Expenses 467,700 - 57,700 410,000 410,000 - - - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 57,700 - 57,700 - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (State)210,000 - - 210,000 210,000 - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)200,000 - - 200,000 200,000 - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources 467,700 - 57,700 410,000 410,000 - - - - -
*Image shown is one of the final design options under consideration.
Project Expenditures & Resources TOTAL Programmed Six-Year Program
This project will install major entry signage, enhanced landscaping, lighting and electrical features as part of the I-405/NE 44th St
Interchange project.
To create a unique gateway for the city as part of the WSDOT I-405 Renton to Bellevue Widening and Express Toll Lanes project.
The WSDOT I-405 project started construction in 2020. The City received $210,000 from the State Legislature to fund gateway entry signage
into the City. The City also received $200,000 from Flat Iron to help fund construction. City staff is currently working through Design.
Construction is anticipated to start in 2024.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
467,700 -
I-405/44th Gateway Signage & Green-Scaping
Improvements TIP #: CED-01
82
AGENDA ITEM # 10. a)
83
AGENDA ITEM # 10. a)
Section E
Appendix
2024 – 2029 Transportation Improvement Program
84
AGENDA ITEM # 10. a)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
Abbreviations and Acronyms
The following list defines the abbreviated words and/or acronyms used in the City of Renton’s Six-Year
Transportation Improvement Program.
ADA American Disability Act
BAT Business Access Transit
BNSF Burlington Northern Santa Fe
BRAC Bridge Replacement Advisory Committee
CBD Central Business District
CIP Capital Improvement Program
CMAQ Congestion Mitigation and Air Quality
CTR Commute Trip Reduction (State Act)
DOE Department of Ecology
EB Eastbound
ECL East City Limits
EIS Environmental Impact Study
FHWA Federal Highway Administration
FMSIB Freight Mobility Strategic Investment Board
FY Fiscal Year
GIS Geographic Information System
GMA Growth Management Act
HOV High Occupancy Vehicles
ITS Intelligent Transportation System
LF Linear Feet
LID Local Improvement District
LRF Local Revitalization Financing
LOS Level of Service
MAP-21 Moving Ahead for Progress in the 21st Century Act
METRO Municipality of Metropolitan Seattle
MOU Memorandum of Understanding
MUTCD Manual on Uniform Traffic Control Devices
NCL North City Limits
NB Northbound
PS&E Plans, Specifications, and Estimates
ROW Right-of-Way
RKAAMP Renton Kent Auburn Area Mobility Plan
RTA Regional Transit Authority
SB Southbound
SCL South City Limits
SOV Single Occupant Vehicle
ST Sound Transit
SR State Route
STP Surface Transportation Program
TDM Transportation Demand Management Program
TIB Transportation Improvement Board
TIP Transportation Improvement Plan
WB Westbound
WCL West City Limits
WSDOT Washington State Department of Transportation
85
AGENDA ITEM # 10. a)
1
CITY OF RENTON, WASHINGTON RESOLUTION NO. ________ A RESOLUTION OF THE CITY OF RENTON, WASHINGTON SETTING A PUBLIC HEARING DATE REGARDING VACATION OF A PORTION OF THE EAST-WEST RIGHT OF WAY THROUGH BLOCK 15, C.D. HILLMANS LAKE WASHINGTON GARDEN OF EDEN (PETERSON STREET VACATION PETITION VAC-23-001.)
WHEREAS, a petition was filed with the City Clerk on or about June 26, 2023, pursuant to
the requirements of chapter 35.79 RCW and Renton Municipal Code 9-14-2, petitioning for the
vacation of a portion of the east-west right of way through block 15 of C.D. Hillmans Lake
Washington Garden of Eden Division No. 1, as hereinafter more particularly described, and the
petition was signed by the owners of more than two-thirds (2/3) of the property abutting upon
that portion of the right of way sought to be vacated, and same being described in Exhibit A, and
depicted in Exhibit B, attached hereto and made a part hereof as if fully set forth herein.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO
RESOLVE AS FOLLOWS:
SECTION I. That the 11th day of September, 2023, at the hour of 7:00 P.M., is hereby
fixed as the date and time for a public hearing to consider the above-mentioned petition for
vacating the Street; which hearing date is not more than sixty (60) nor less than twenty (20) days
from the date of passage of this resolution.
SECTION II. The City Clerk is hereby authorized and directed to give notice of the time
and date of the public hearing as provided in RMC 9-14-3.A, including instructions on accessing
the hearing via Zoom, if applicable, and/or providing comment, and any and/or all persons
interested therein or objecting to said vacation may then appear and be heard, or they may file
AGENDA ITEM # 10. b)
RESOLUTION NO. ________
2
their written objections with the City Clerk at or prior to the time of public hearing on the
vacation.
SECTION III. After the close of the public hearing, the City Council shall determine
whether the vacation of the Street should be granted. If the City Council determines that the
Street should be vacated, the City reserves the right to retain an easement for public utility and
related purposes.
SECTION IV. If the City Council determines that the Street should be vacated, at a future
date to be determined, the City Council shall determine the classification of the Street to be
vacated and, in accordance with the discretion provided in RCW 35.79.030, the amount of
compensation, if any, to be paid by the petitioner-owner(s) to the City for such vacation.
PASSED BY THE CITY COUNCIL this ______ day of _______________________, 2023.
______________________________
Jason A. Seth, City Clerk
APPROVED BY THE MAYOR this ______ day of _______________________, 2021.
______________________________
Armondo Pavone, Mayor
AGENDA ITEM # 10. b)
RESOLUTION NO. ________
3
Approved as to form:
______________________________
Shane Moloney, City Attorney
RES:1947:7/31/23
AGENDA ITEM # 10. b)
The following described alley to wit:
EXHIBIT "A"
LEGAL DESCRIPTION
An alley right-of-way, having width of 12 feet, running in an east-west direction through block 15, C.D .
Hillman's Lake Washington Garden of Eden Division No . 1, as recorded in Volume 11 of plats, page 63,
records of King County, Washington; and lying westerly of the westerly right-of-way line of Park Avenue
North, extended and easterly of the southerly extension of the west line of Lot 3, Block 15 from the
southwest corner of Lot 3 to the northwest corner of Lot 48, Block 15, of said plat.
As situated within the southwest¼ Section 32, Township 24 N., Range 5 E., W.M .
VACATION AREA
-~ '
------·--·--·· -... _ ... -·--•-• ------• .. --·--;;; iaiotr· -~~·-• -~!!.! ~-~-· · ··--•" • • --·--• • --•--·• -....... ,. --·· ............ j ' ~ .~-~M--~
~ \) i
' -.. ----.. ---·-·· ...... ----........ -·-·· -.... -------.. ---·-.. ------·--.. ----·-·--.... -----·-.. ---------1 t-----
39
-......... _._ .... _._ __ -....... ,•·••··· -.... •·~--·--.... ---;:,~·••·• .... --·-·· -. •·: -·-·· •---..... ------. --------.. -........... -.. •·• -.. --------.. +--·-.... -----·-·-.. -.. -______ ·: --.. .
AGENDA ITEM # 10. b)
AGENDA ITEM # 10. b)
1
CITY OF RENTON, WASHINGTON
RESOLUTION NO. _______
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, AUTHORIZING THE
MAYOR AND CITY CLERK TO ENTER INTO FIRST AMENDMENT TO THE JOINT
INTERLOCAL AGREEMENT REGARDING THE COMMUNITY DEVELOPMENT BLOCK
GRANT PROGRAM BETWEEN THE CITY AND KING COUNTY.
WHEREAS, the federal government, through adoption and administration of the Housing
and Community Development Act of 1974 (the “Act”), as amended, makes Community
Development Block Grant (“CDBG”) funds available to King County for expenditure in three-year
funding cycles; and
WHEREAS, by Resolution No. 4220 (July 7, 2014), the City entered into a consortium with
King County and other participating jurisdictions, pursuant to and authorized by the National
Affordable Housing Act of 1990, as amended, 42 USC 12701, et. seq and 24 CFR Part 92 for
purposes of the HOME Investment Partnerships Program (“HOME Program”), and to cooperate
in undertaking HOME Program activities; and
WHEREAS, the City and Kind County remain committed to targeting CDBG and HOME
Program funds to ensure benefits for very low to moderate-income persons as defined by the
United States Department of Housing and Urban Development (“HUD”); and
WHEREAS, the Interlocal Agreement was entered into pursuant to and in accordance with
the Interlocal Cooperation Act, RCW 39.34, for planning the distribution and administration of
CDBG, HOME Program, and other federal funds received from HUD; and
AGENDA ITEM # 10. c)
RESOLUTION NO. _______
2
WHEREAS, in order to maintain access to federal funding, HUD has requested updated
language in Section I of the Interlocal Agreement to memorialize federal civil rights and fair
housing requirements which are consistent with the administrative practices of the consortium.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO
RESOLVE AS FOLLOWS:
SECTION I. The Mayor and City Clerk are hereby authorized to enter into the First
Amendment to the Joint Interlocal Agreement Regarding the Community Development Block
Grant Program Between the City and King County, attached as Exhibit “A” and incorporated by
this reference.
PASSED BY THE CITY COUNCIL this ______ day of _____________________, 2023.
______________________________
Jason A. Seth, City Clerk
APPROVED BY THE MAYOR this ______ day of _____________________, 2023.
______________________________
Armondo Pavone, Mayor
Approved as to form:
______________________________
Shane Moloney, City Attorney
RES-EHHS:1948:08.01.2023
AGENDA ITEM # 10. c)
RESOLUTION NO. _______
3
EXHIBIT “A”
FIRST AMENDMENT TO THE JOINT INTERLOCAL AGREEMENT
REGARDING THE COMMUNITY DEVELOPMENT BLOCK GRANT
PROGRAM BETWEEN THE CITY OF RENTON AND KING COUNTY
AGENDA ITEM # 10. c)
First Amendment to Joint Interlocal Agreement
Page 1 of 4
FIRST AMENDMENT TO THE JOINT INTERLOCAL AGREEMENT
REGARDING THE COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM
BETWEEN THE CITY OF RENTON AND KING COUNTY
This First Amendment to the Interlocal Cooperation Agreement Regarding the Community
Development Block Grant Program between the City of Renton and King County (the “First
Amendment”) is made by and between the City of Renton (“the City”), and King County (“the
County”), both of which entities being a unit of general local government in the State of
Washington and which may be referred to hereinafter individually as a “Party” and collectively
as the “Parties.”
RECITALS
A. On 7/25/2014, pursuant to Ch. 39.34 RCW, the Parties entered that certain Interlocal
Cooperation Agreement Regarding the Community Development Block Grant Program
(the “Agreement”).
B. As acknowledged by the Agreement, the area encompassed by unincorporated King
County and all participating cities has been designated by the United States Department
of Housing and Urban Development (“HUD”) as an urban county for the purpose of
receiving Community Development Block Grant (“CDGB”) funds, as administered under
the Housing and Community Development Act of 1974 (the “Act”).
C. Signatory jurisdictions to the Agreement are CDBG Consortium Partners for purposes of
the Agreement and the Act.
D. Under the Agreement and pursuant to the Act, King County is responsible to the federal
government for all activities undertaken with CDBG funds and for ensuring that all
CDBG assurances and certifications King County is required to submit to HUD under the
Annual Action Plan are met.
E. Urban counties are periodically required to requalify for their entitlement status under
CDGB and related federal programs.
F. Under Notice CPD-23-02, issued by HUD April 10, 2023, and setting forth instructions
for continuing qualification for participating urban counties in the CDBG program for
Fiscal Years 2024-2026, all existing urban counties are required to have incorporated in
their cooperation agreements certain required language regarding fair housing and civil
rights obligations.
G. The Agreement does not contain all the required language regarding fair housing and
civil rights obligations.
DocuSign Envelope ID: 7DA0973D-4FCC-41FC-8149-F01E4E9832EE
In Process
AGENDA ITEM # 10. c)
First Amendment to Joint Interlocal Agreement
Page 2 of 4
H. Under Notice CPD-23-02, urban counties have the option of drafting a separate
amendment to their existing cooperation agreements with signatory jurisdictions that
include the required language rather than drafting a new cooperation agreement that
contains the provisions.
I. The purpose of this First Amendment is to expressly state the required language
regarding fair housing and civil rights obligations and to memorialize the attendant
obligations as though set forth in the Agreement.
AGREEMENT
NOW, THEREFORE, in consideration of the terms, conditions and mutual covenants set forth
herein, the Parties agree to amend the Agreement as follows:
1. The foregoing recitals are true and correct in all respects and are incorporated hereby as if
fully set forth herein.
2. Section I of the Agreement is hereby amended and restated in its entirety as follows:
“The County and City agree to cooperate to undertake, or assist in undertaking, community
renewal and lower-income housing assistance activities., funded from annual CDBG, ESG
and HOME Program funds from federal fiscal years 2024, 2025 and 2026 appropriations,
from recaptured funds and from any program income generated from the expenditure of
such funds. These activities include the provision of decent housing, homeless assistance,
and a suitable living environment and economic development opportunities, principally for
persons with very low to moderate incomes. The County and City shall (i) take all actions
necessary to assure compliance with the County’s certification under Section 104(b) of
Title I of the Housing and Community Development Act of 1974, (ii) assure that all CDBG
grants will be conducted and administered in conformity with Title VI of the Civil Rights
Act of 1964, the implementing regulations at 24 CFR part 1, the Fair Housing Act, and the
implementing regulations at 24 CFR part 100, and (iii) affirmatively furthering fair housing
as defined and in accordance with 24 CFR 5.151 and 5.152 and the implementing
regulations at 24 CFR part 8, 24 CFR part 35 and 24 CFR part 146.”
3. Except as specifically provided for in this First Amendment, all other provisions of the
Agreement shall remain unchanged and in full force and effect.
4. Any capitalized terms not defined in this First Amendment shall have the meanings given
them in the Agreement.
5. This First Amendment shall be effective as of the date it has been executed by both
Parties.
DocuSign Envelope ID: 7DA0973D-4FCC-41FC-8149-F01E4E9832EE
In Process
AGENDA ITEM # 10. c)
First Amendment to Joint Interlocal Agreement
Page 3 of 4
6. This First Amendment may be executed in counterparts, each of which shall be deemed
to be an original, but all of which together shall constitute one and the same instrument.
[SIGNATURE BLOCKS ON FOLLOWING PAGE]
DocuSign Envelope ID: 7DA0973D-4FCC-41FC-8149-F01E4E9832EE
In Process
AGENDA ITEM # 10. c)
First Amendment to Joint Interlocal Agreement
Page 4 of 4
IN WITNESS WHEREOF, the Parties hereto have caused their duly authorized representatives
to execute this First Amendment to the Agreement as of the date set forth below their signatures.
City of Renton
King County
_________________________________ __________________________________
Name: Armondo Parvone
Date:
Title: Mayor
Attest:___________________________
Name: Jason Seth
Title: City Clerk
For King County Executive
By: Simon P. Foster
Title: Division Director
Housing, Homelessness and Community
Development
Department of Community and Human
Services
Approved as to Form: Approved as to Form:
_____________________________
___________________________________
M. Patrice Kent, Sr. Assistant City Attorney Ryan W. Ridings, King County Senior Deputy
Prosecuting Attorney
DocuSign Envelope ID: 7DA0973D-4FCC-41FC-8149-F01E4E9832EE
In Process
AGENDA ITEM # 10. c)
1
CITY OF RENTON, WASHINGTON
RESOLUTION NO. _______
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, AUTHORIZING THE
MAYOR AND CITY CLERK TO ENTER INTO AMENDMENT NO. 1 TO THE HOME
INVESTMENT PARTNERSHIPS PROGRAM INTERLOCAL AGREEMENT BETWEEN
THE CITY AND KING COUNTY.
WHEREAS, King County is an urban county as defined by 24 CFR 92.2 and 24 CFR 570.3;
and
WHEREAS, a unit of general local government that is located within an urban county may
be a part of a consortium pursuant to and authorized by the National Affordable Housing Act of
1990, as amended, 42 USC 12701, et. seq and 24 CFR Part 92 for purposes of the HOME
Investment Partnerships Program (“HOME Program”); and
WHEREAS, by Resolution No. 4216 (June 16, 2014), the City entered into a consortium
with King County and other participating jurisdictions, for purposes of the HOME Program, and
to cooperate in undertaking HOME Program activities; and
WHEREAS, the City and King County remain committed to targeting HOME Program funds
to ensure benefits for very low to moderate-income persons as defined by the United States
Department of Housing and Urban Development (“HUD”); and
WHEREAS, the Interlocal Agreement was entered into pursuant to and in accordance with
the Interlocal Cooperation Act, RCW 39.34, for planning the distribution and administration of
CDBG, HOME Program, and other federal funds received from HUD; and
AGENDA ITEM # 10. d)
RESOLUTION NO. _______
2
WHEREAS, in order to maintain access to federal funding, HUD has requested updated
language in Section 10 of the Interlocal Agreement to memorialize federal civil rights and fair
housing requirements which are consistent with the administrative practices of the consortium.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO
RESOLVE AS FOLLOWS:
SECTION I. The Mayor and City Clerk are hereby authorized to enter into the First
Amendment to the Joint Interlocal Agreement Regarding the Community Development Block
Grant Program Between the City and King County, attached as Exhibit “A” and incorporated by
this reference.
PASSED BY THE CITY COUNCIL this ______ day of _____________________, 2023.
______________________________
Jason A. Seth, City Clerk
APPROVED BY THE MAYOR this ______ day of _____________________, 2023.
______________________________
Armondo Pavone, Mayor
Approved as to form:
______________________________
Shane Moloney, City Attorney
RES-EHHS:1949:08.01.2023
AGENDA ITEM # 10. d)
RESOLUTION NO. _______
3
EXHIBIT “A”
AMENDMENT NO. 1 TO THE HOME INVESTMENT
PARTNERSHIPS PROGRAM INTERLOCAL AGREEMENT
BETWEEN THE CITY OF RENTON AND KING COUNTY
AGENDA ITEM # 10. d)
Amendment No. 1 to Interlocal Cooperation Agreement
Page 1 of 4
AMENDMENT NO. 1 TO HOME INVESTMENT PARTNERSHIPS PROGRAM
INTERLOCAL COOPERATION AGREEMENT
This First Amendment to the Home Investment Partnerships Program Interlocal Cooperation
Agreement between the City of Renton and King County (“Amendment No. 1” or the “First
Amendment”) is made by and between the City of Renton (“the City”), and King County (“the
County”), both of which entities being a unit of general local government in the State of
Washington and which may be referred to hereinafter individually as a “Party” and collectively
as the “Parties.”
RECITALS
A. On 7/25/2014, pursuant to Ch. 39.34 RCW, the Parties entered that certain Interlocal
Cooperation Agreement Regarding the Community Development Block Grant Program
(the “Agreement”).
B. As acknowledged by the Agreement, the area encompassed by unincorporated King
County and all participating cities has been designated by the United States Department
of Housing and Urban Development (“HUD”) as an urban county for the purpose of
receiving Community Development Block Grant (“CDGB”) funds, as administered under
the Housing and Community Development Act of 1974 (the “Act”).
C. Signatory jurisdictions to the Agreement are CDBG Consortium Partners for purposes of
the Agreement and the Act.
D. Under the Agreement and pursuant to the Act, King County is responsible to the federal
government for all activities undertaken with CDBG funds and for ensuring that all
CDBG assurances and certifications King County is required to submit to HUD under the
Annual Action Plan are met.
E. Urban counties are periodically required to requalify for their entitlement status under
CDGB and related federal programs.
F. Under Notice CPD-23-02, issued by HUD April 10, 2023, and setting forth instructions
for continuing qualification for participating urban counties in the CDBG program for
Fiscal Years 2024-2026, all existing urban counties are required to have incorporated in
their cooperation agreements certain required language regarding fair housing and civil
rights obligations.
G. The Agreement does not contain all the required language regarding fair housing and
civil rights obligations.
DocuSign Envelope ID: 8EA4A1AE-C16D-40EE-A3EB-029272725E68
In Process
AGENDA ITEM # 10. d)
Amendment No. 1 to Interlocal Cooperation Agreement
Page 2 of 4
H. Under Notice CPD-23-02, urban counties have the option of drafting a separate
amendment to their existing cooperation agreements with signatory jurisdictions that
include the required language rather than drafting a new cooperation agreement that
contains the provisions.
I. The purpose of this First Amendment is to expressly state the required language
regarding fair housing and civil rights obligations and to memorialize the attendant
obligations as though set forth in the Agreement.
AGREEMENT
NOW, THEREFORE, in consideration of the terms, conditions and mutual covenants set forth
herein, the Parties agree to amend the Agreement as follows:
1. The foregoing recitals are true and correct in all respects and are incorporated hereby as if
fully set forth herein.
2. Section 10 of the Agreement is hereby amended and restated in its entirety as follows:
“The County and City agree to cooperate to undertake, or assist in undertaking, community
renewal and lower-income housing assistance activities, funded from annual CDBG, ESG
and HOME Program funds, from recaptured funds and from any program income generated
from the expenditure of such funds. These activities include the provision of decent
housing, homeless assistance, and a suitable living environment and economic
development opportunities, principally for persons with very low to moderate incomes.
The County and City shall (i) take all actions necessary to assure compliance with the
County’s certification under Section 104(b) of Title I of the Housing and Community
Development Act of 1974, (ii) assure that all CDBG grants will be conducted and
administered in conformity with Title VI of the Civil Rights Act of 1964, the implementing
regulations at 24 CFR part 1, the Fair Housing Act, and the implementing regulations at 24
CFR part 100, and (iii) affirmatively furthering fair housing as defined and in accordance
with 24 CFR 5.151 and 5.152 and the implementing regulations at 24 CFR part 8, 24 CFR
part 35 and 24 CFR part 146.”
3. Except as specifically provided for in this First Amendment, all other provisions of the
Agreement shall remain unchanged and in full force and effect.
4. Any capitalized terms not defined in this First Amendment shall have the meanings given
them in the Agreement.
5. This First Amendment shall be effective as of the date it has been executed by both
Parties.
DocuSign Envelope ID: 8EA4A1AE-C16D-40EE-A3EB-029272725E68
In Process
AGENDA ITEM # 10. d)
Amendment No. 1 to Interlocal Cooperation Agreement
Page 3 of 4
6. This First Amendment may be executed in counterparts, each of which shall be deemed
to be an original, but all of which together shall constitute one and the same instrument.
[SIGNATURE BLOCKS ON FOLLOWING PAGE]
DocuSign Envelope ID: 8EA4A1AE-C16D-40EE-A3EB-029272725E68
In Process
AGENDA ITEM # 10. d)
Amendment No. 1 to Interlocal Cooperation Agreement
Page 4 of 4
IN WITNESS WHEREOF, the Parties hereto have caused their duly authorized representatives
to execute this Amendment No. 1 to the Agreement as of the date set forth below their
signatures.
City of Renton
King County
_________________________________ __________________________________
Name: Armondo Parvone
Date:
Title: Mayor
Attest:___________________________
Name: Jason Seth
Title: City Clerk
For King County Executive
By: Simon P. Foster
Title: Division Director
Housing, Homelessness and Community
Development
Department of Community and Human
Services
Approved as to Form: Approved as to Form:
_____________________________
___________________________________
M. Patrice Kent, Sr. Assistant City Attorney Ryan W. Ridings, King County Senior Deputy
Prosecuting Attorney
DocuSign Envelope ID: 8EA4A1AE-C16D-40EE-A3EB-029272725E68
In Process
AGENDA ITEM # 10. d)
1
CITY OF RENTON, WASHINGTON
ORDINANCE NO. ________
AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, ESTABLISHING A
TRANSPORTATION BENEFIT DISTRICT WITHIN THE CORPORATE CITY LIMITS,
PROVIDING FOR TRANSPORTATION IMPROVEMENTS WITHIN THE DISTRICT,
ADOPTING A NEW CHAPTER 27, RENTON MUNICIPAL CODE, TITLE V, FINANCE
AND BUSINESS REGULATION, “TRANSPORTATION BENEFIT DISTRICT”, AND
PROVIDING FOR SEVERABILITY, AND ESTABLISHING AN EFFECTIVE DATE.
WHEREAS, RCW 35.21.225 authorizes the legislative authority of a city to establish a
transportation benefit district (TBD), for the purpose of acquiring, constructing, improving,
providing, and funding transportation improvements with the TBD, subject to the provisions of
Chapter 36.73; and
WHEREAS, transportation improvements are defined in RCW 36.73.015 to include
projects contained in the transportation plan of a city, and which projects may also include the
operation, preservation, and maintenance of these facilities or programs; and
WHEREAS, the City of Renton’s Transportation Improvement Program (TIP), as now
existing and as it may exist in the future, constitutes a “transportation plan” as contemplated by
RCW 36.73.015; and
WHEREAS, the Street Overlay Program within the City’s TIP describes the need for a
coordinated, cost-efficient approach to street resurfacing improvements and other
improvements that may be funded by a TBD; and
WHEREAS, the Walkway Program within the City’s TIP describes the need to provide safe
and convenient non-motorized facilities to complete the city-wide transportation network that
may be funded by a TBD; and
AGENDA ITEM # 10. e)
ORDINANCE NO. ________
2
WHEREAS, the City Council finds that the establishment of a TBD would enable the City,
in conjunction with the process for the adoption of its annual updates to the TIP, to fund required
City street resurfacing and walkway improvements in a coordinated, efficient manner; and
WHEREAS, the City Council, after giving proper notice, conducted a public hearing and
took public comment regarding the establishment of a TBD in accordance with RCW 36.73.050;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO
ORDAIN AS FOLLOWS:
SECTION I. All portions of the Renton Municipal Code in this ordinance that are not
shown in strikethrough and underline edits or are not explicitly repealed herein remain in effect
and unchanged.
SECTION II. The purpose of this Ordinance is to establish a Transportation Benefit District
pursuant to RCW 35.21.225 and RCW 36.73. The City Council finds that it is in the public interest
to provide adequate levels of funding for the purposes of ongoing transportation improvements
that preserve, maintain, and as appropriate construct or reconstruct the transportation
infrastructure of the City of Renton, consistent with Chapter 36.73 RCW.
SECTION III. Title V of the Renton Municipal Code is amended to add a new chapter 27,
entitled “Renton Transportation Benefit District” to read as follows:
CHAPTER 5.27
RENTON TRANSPORTATION BENEFIT DISTRICT
SECTION:
5-27-010: Establishing Transportation Benefit District.
5-27-020: Governing board.
5-27-030: Powers of the district.
5-27-040: Use of funds.
5-27-050: Dissolution of the District
AGENDA ITEM # 10. e)
ORDINANCE NO. ________
3
5-27-010 ESTABLISHING TRANSPORTATION BENEFIT DISTRICT:
There is hereby created Renton Transportation Benefit District (RTBD) with
geographical boundaries comprised of the existing corporate limits of the City, and
as those boundaries may be adjusted in the future.
5-27-020 GOVERNING BOARD:
The governing board of the RTBD shall be the Renton City Council acting in an ex
officio and independent fashion.
5-27-030 POWERS OF THE DISTRICT:
A. The Board shall have and may exercise any powers set out in chapter 36.73
RCW to fulfill the purpose of the RTBD.
B. Consistent with RCW 36.73.020(4), the secretary/treasurer of RTBD shall
be the City Finance Administrator. As such, the Finance Administrator shall
establish those funds and accounts on behalf of RTBD as required and shall
disburse funds and pay claims as approved by the RTBD Board and prepare and
maintain such accounts as appropriate and/or required by state or federal law.
C. The City Attorney will serve as legal advisor to the RTBD Board, except
where separate counsel is engaged by RTBD.
D. Other City employees shall carry out the operations of RTBD as agreed
by RTBD and the City. Such employees and the contracts of RTBD shall be overseen
and administrated by the Mayor and/or her/his designee.
E. The RTBD Board shall develop a material change policy to address major
plan changes that affect project delivery or the ability to finance the plan,
AGENDA ITEM # 10. e)
ORDINANCE NO. ________
4
pursuant to the requirements set forth in RCW 36.73.160(1). At a minimum, if a
transportation improvement exceeds its original cost by more than twenty
percent, as identified in the District’s original plan, a public hearing shall be held
to solicit public comment regarding how the cost change should be resolved.
F. The RTBD Board shall issue an annual report, pursuant to the requirements of
RCW 36.73.160(2).
5-27-040 USE OF FUNDS:
Funds available to the RTBD may be used for any purpose allowed by chapter
36.73 RCW with emphases on meeting the unfunded needs of the City’s Overlay
Program and Walkway Program within the currently adopted Six Year
Transportation Program.
5-27-050 DISSOLUTION OF THE DISTRICT:
The district shall be dissolved when all indebtedness of the district is retired and
when all the district’s anticipated responsibilities have been satisfied.
SECTION IV. Upon approval of the City Attorney, the City Clerk is authorized to direct
the codifier to make necessary corrections to this ordinance, including the corrections of
scriveners or clerical errors; references to other local, state, or federal laws, codes, rules, or
regulations; or ordinance numbering and section/subsection numbering and references. The City
Clerk is further authorized to direct the codifier to update any chapter, section, or subsection
titles in the Renton Municipal Code affected by this ordinance.
SECTION V. If any section, subsection, sentence, clause, phrase, or word of this
ordinance should be held to be invalid or unconstitutional by a court of competent jurisdiction,
AGENDA ITEM # 10. e)
ORDINANCE NO. ________
5
such invalidity or unconstitutionality thereof shall not affect the constitutionality of any other
section, subsection, sentence, clause, phrase, or word of this ordinance.
SECTION VI. This ordinance shall be in full force and effect five (5) days after publication
of a summary of this ordinance in the City's official newspaper. The summary shall consist of this
ordinance's title.
PASSED BY THE CITY COUNCIL this day of , 2023.
Jason A. Seth, City Clerk
APPROVED BY THE MAYOR this day of , 2023.
Armondo Pavone, Mayor
Approved as to form:
Shane Moloney, City Attorney
Date of Publication:
ORD-PW:2272:06.23.23
AGENDA ITEM # 10. e)
1
CITY OF RENTON, WASHINGTON
ORDINANCE NO. ________
AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, AMENDING THE CITY’S
COMPREHENSIVE PLAN LAND USE MAP, AND THE ZONING MAP OF THE RENTON
MUNICIPAL CODE BY APPLYING THE RESIDENTIAL HIGH DENSITY LAND USE
DESIGNATION AND APPLYING THE COMMERCIAL NEIGHBORHOOD ZONING
DISTRICT TO THREE PARCELS ADJACENT TO NORTH 30 TH STREET, PROVIDING FOR
SEVERABILITY, AND ESTABLISHING AN EFFECTIVE DATE.
WHEREAS, the Council has heretofore adopted and filed a Comprehensive Plan, and the
Council has implemented and amended the Comprehensive Plan from time to time, together
with the adoption of amendments to the Zoning Map of Title IV of the Renton Municipal Code;
and
WHEREAS, the Planning Commission has heretofore fully recommended to the Council,
from time to time, certain amendments to the City’s Comprehensive Plan; and
WHEREAS, the City initiated the proceeding Comprehensive Plan amendment and rezone
for three parcels, identified with Assessor’s Parcel Numbers 3342103256, 3342103255,
3342103270, with the support of the property owners; and
WHEREAS, this matter was duly referred to the Planning Commission for investigation
and study, and the matter was considered by the Planning Commission; and
WHEREAS, pursuant to RCW 36.70A.106, on April 28, 2023, the City notified the State of
Washington of its intent to adopt amendments to its development regulations; and
WHEREAS, the Planning Commission held a public hearing on May 17, 2023, considered
all relevant matters, and heard all parties in support or opposition, and subsequently forwarded
a recommendation to the City Council.
AGENDA ITEM # 10. f)
ORDINANCE NO. ________
2
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO
ORDAIN AS FOLLOWS:
SECTION I. All portions of the City’s Comprehensive Plan Land Use Map and the Zoning
Map of the Renton Municipal Code in this ordinance that are not shown as amended herein
remain in effect and unchanged.
SECTION II. The Land Use Map of the Comprehensive Plan is hereby amended as
shown in Attachment A. The Planning Division is hereby authorized and directed to change the
Land Use Map of the Comprehensive Plan to evidence said amendment according to Attachment
A attached hereto and made part hereof as if fully set forth herein.
SECTION III. The Zoning Map adopted in Section 4-2-010 of the Renton Municipal Code
is hereby amended as shown in Attachment B. The Planning Division is hereby authorized and
directed to change the City of Renton Zoning Map to evidence said amendment according to
Attachment B attached hereto and made part hereof as if fully set forth herein.
SECTION IV. Upon approval of the City Attorney, the City Clerk is authorized to direct
the codifier to make necessary corrections to this ordinance, including the corrections of
scriveners or clerical errors; references to other local, state, or federal laws, codes, rules, or
regulations; or ordinance numbering and section/subsection numbering and references. The City
Clerk is further authorized to direct the codifier to update any chapter, section, or subsection
titles in the Renton Municipal Code affected by this ordinance.
SECTION V. If any section, subsection, sentence, clause, phrase, or word of this
ordinance should be held to be invalid or unconstitutional by a court of competent jurisdiction,
AGENDA ITEM # 10. f)
ORDINANCE NO. ________
3
such invalidity or unconstitutionality thereof shall not affect the constitutionality of any other
section, subsection, sentence, clause, phrase, or word of this ordinance.
SECTION VI. This ordinance shall be in full force and effect five (5) days after publication
of a summary of this ordinance in the City’s official newspaper. The summary shall consist of this
ordinance’s title.
PASSED BY THE CITY COUNCIL this day of , 2023.
Jason A. Seth, City Clerk
APPROVED BY THE MAYOR this day of , 2023.
Armondo Pavone, Mayor
Approved as to form:
Shane Moloney, City Attorney
Date of Publication:
ORD-CED:2266:07.14.2023
AGENDA ITEM # 10. f)
RHD
RMD
RMD
RHD
Park Ave NN 28th Pl
N 29th St
N 30th St
N 31st St
¯0 100
US Feet
Land Use Changes
RMD to RHD
Land Use Designations
RMD - Residential Medium Density
RHD - Residential High Density
N 30th St CPA and Rezone
Attachment A
Comprehensive Plan Land Use Map
Change from RMD to RHD
AGENDA ITEM # 10. f)
R-8
R-8
R-10
R-8
R-10 CN
R-8
R-8
R-6
R-6
R-8
CN
CN
Park Ave NN 28th Pl
N 29th St
N 30th St
N 31st St
¯0 100
US Feet
Rezone Area
R-6 to CN
Zoning Designations
R-6 (Residential 6 DU/Acre)
R-8 (Residential 8 DU/Acre)
R-10 (Residential 10 DU/Acre)
CN (Commercial Neighborhood)
Change from R-6 to CN
N 30th St CPA and Rezone
Attachment B
Zoning Map
AGENDA ITEM # 10. f)