STORM DRAINAGE CALCULATIONS
FOR
ALLPAK CONTAINER, INC.
S.W. 27TH ST. WEST OF LIND AVE. S.W.
RENTON, WASHINGTON
BY
BUSH, ROED & HITCHINGS, INC.
2009 MINOR AVENUE EAST
SEATTLE, WASHINGTON 98102
(206) 323-4144
BRH JOB NO. 90135.04
JULX 31, 1990
REV i to -t 1-70
.• �N J . IV, •�
i /fi,c� W'�iyiy :`Q
I �
f jw•
fA
QEvcs6v
i z- �d
u
S /J- 2 %-IAA
(2D
**** STORM WATER HYDROLOGY ****
Runoff by Rational Method
STEEL EQUhTIOH COEFFICIENTS:
K = 39.09
b = 9.48
WATERCOURSE TYPES;
1 FOREST wi HEAVY GROUND LITTER
2 MINIMUM TILLAGE CULTIVATION
3 SHORT GRASS PASTURE & LAWNS
4 NEARLY BARE GROUND
5 GRASSED WATERWAY
6 PAVED AREA
7 OTHER
SEA 25 YR ALLPAK 12/4i90
INIT Tc = 5.00 min
INIT 28C = 0.00
OVERLAND FLOW:
RUNOFF:
POINT CB 13 TO CB 17
Tc =
5.00
min
FIRER =
0.52
acres
C =
0.86
EAC =
0.45
I =
2.70
inzhr
Q DESIGN =
1.21
cis
V DESIGN =
2.59
ft/sec
PIPE=
INVERT IN =
14.50
it
INVERT OUT =
14.15
it
LENGTH =
140.00
it
n =
0.012
DIAM =
12.00
in
SLOPE =
0.25
%
Q FULL =
1.93
cis
V FULL
2.46
ftisec
FLOW TIME =
0.90
min
gol35, o �
POINT CB 17 TO CB 16A
Tc =
5.90
min
AREA =
0.65
acres
C =
0.87
2AC =
1.01
I =
2.54
inihr
Q DESIGN =
2.57
cis
V DESIGN =
3.86
ftisec
PIPE=
INVERT IH =
14.15
it
INVERT OUT =
13.35
it
LENGTH =
169.00
it
n =
0.012
DIAM =
12.00
in
SLOPE =
0.48
%
Q FULL =
2.66
cis
V FULL =
3.39
ft/sec
FLOW TIME =
0.73
min
POINT CB 16A TO 16
Tc =
6.63
min
AREA =
0.56
acres
C =
0.84
ERC =
1.48
I =
2.43
in/hr
Q DESIGN =
3.59
cis
V DESIGN =
3.55
ft/sec
PIPE=
A�.
INVERT IN =
13.35
it
INVERT OUT =
13.03
it
LENGTH =
106.00
it
n =
0.012
DIAM =
15.00
in
SLOPE =
0.30
%
Q FULL =
3.83
cis
V FULL =
3.12
ft/sec
FLOW TIME =
0.50
min
POINT CS 16 TO CB 15R
Tc =
7.13
min
AREA =
0.00
acres
C =
0.90
IRC =
1.48
I =
2.35
in/hr
Q DESIGN =
3.48
cis
V DESIGN =
3.10
ftisec
PIPE:
INVERT IN =
13.03
it
INVERT OUT =
12.88
it
LENGTH =
74.00
it
n =
0.012
DIAM =
18.00
in
SLOPE =
0.20
Q FULL =
5.09
cis
V FULL =
2.88
ft/sec
FLOW TIME =
0.40
min
----------
POINT CB 15A
TO CB 15
Tc =
7.52
min
AREA
= 0.'0
acres
C =
0.74
MAC
= 1.62
1 =
2.30
inihr
Q DESIGN
= 3.73
cfs
V DESIGN
= 3.15
ftisec
PIPE:
INVERT IN
= 12.88
ft
INVERT OUT
= 12.64
ft
LENGTH
= 120.00
ft
n
= 0.012
DIAM
= 18.00
in
SLOPE
= 0.28
Q FULL
= 5.09
cfs
V FULL
= 2.88
ft/sec
FLOW TIME
= 0.64
Min
POINT CB 15 TO CB 14
Tc =
8.16
min
AREA =
0.14
acres
C =
0.77
MAC =
1.73
1 =
2.22
inihr
Q DESIGN =
3.84
cfs
V DESIGN =
3.46
ft/sec
PIPE:
INVERT IN =
12.64
ft
INVERT OUT =
12.34
ft
LENGTH =
120.00
ft
n =
0.012
DIAM =
18.00
in
SLOPE =
0.25
Q FULL =
. 5.69
cfs
V FULL =
3.22
ft/sec
FLOW TIME =
0.58
min
POINT CB 14 TO CB 2
Tc =
8.74
min
AREA =
0.13
acres i
C =
0.89
MAC =
1.85
1 =
2.15
in/hr
Q DESIGN =
3.97
cfs
V DESIGN =
3.92
ftisec
PIPE:
INVERT IN =
12.34
ft
INVERT OUT =
12.81
ft
LENGTH =
96.00
ft
n =
0.012
DIAM =
18.00
in
SLOPE =
0.34
%
Q FULL =
6.63
cfs
V FULL =
3.76
ft/sec
FLOW TIME =
0.41
min
3�
%lE7/ 12-6-So
w
`7013 5.o 7
POINT CB ZOT TO CS 19
Tc =
5.00
min
ARER =
0.26
acres
is =
0.90
SAC =
0.24
=
70
in/hr
1] DESIGN =
y.54
cfs
V DESIGN =
6.45
inset
PIPE
INVERT 1N =
INVERT OUT =
LENGTH =
n =
DIAM =
SLOPE _
Q FULL =
V FULL =
FLOW TIME _
POINT CB 11 TO CB 2
10.75 it
9.00 it
39.00 it
0.E+12
8.00 in
4.50 ,
2. 73 cis
7.96 ftisec
0.10 win
Tc =
5.00
min
AREA =
0.65
acres
C =
0.69
7AC =
0.45
I =
2.70
in/hr
0 DESIGN =
1.21
cis
V DESIGN =
2.80
ftisec
PIPE
INVERT IN =
12.16
it
INVERT OUT =
12.01
it
LENGTH =
43.00
it
n =
0.012
DIAM =
12.00
in
SLOPE =
0.31
%:
0 FULL =
2.13
cfs
V FULL =
2.72
inset
FLOW TIME =
0.29
win
33Ala
8
I )Z—&,—So
�Jw
C/o /3S.07
r
D . •4 7 AcrzE (O l (, 2. 02- (Go r- A L C.Arl c"' s, )
Cc A, = /.;v 6,a,-, = o , 22 3 LFS
o v.L2 -%Lr-s =- o. 5 S S
\/ _ 34P (29 53) _ �o �ZS• s3���. SS 8� _
5 Zs,53 -f .7 873 c�
ACAS:
i'I�iC �rys'� ✓�Li1ME 1 S �rn�cc.t,�-.. T+F�ry � veac.v�� i� T�rE
012-A&, VJLUrAC
5714vLTLR. c'. Aa'J> / N 7-+-c l �I'iL0T 5T,4-Y e5115e,, IA44-Y
"'1t� ��E',
Tlfi� G.U,
I4r.�D
P��NI'P s�ZinJG, G4u..VL�4-77oN� R��A�r,J
coc-u - r-Jo. /o
AT = 0,32ACzc-
G = 0.8.5
6�, = /00if, 0.'z-,C. s
27 3 L-�5 _ o. 82
Ld•3�i(o•SS�
n,BZ
3 3 l3/3
�>w
90135.a7
(34Zo)(i�.bs)
z�(.548 c- Pre 7-T C-r
At le
fto--, CAVC'S / rN6. /O'Yoviter.
/ I
,vA (70 X J
X215io cF. � w /7 S CF-
�ov�
77ff ?c.wA P 5, Z i t-16 C A-t C is t-A-n opS 7*- ejw ✓ 6.
Golder Associates Inc.
4104.148th Avenue, NE
Redmond, WA 98052
Telephone (206) 883-0777
Fox (206) 882-5498
October 24, 1994
William Polk Associates
1120 Post Alley
Seattle, WA 98101
ATTENTION: Mr. Tom Schilb
RE: GEOTECHNICAL DESIGN EVALUATION
PROPOSED K-MART ADDITION, STORE #4480
RENTON, WASHINGTON
Dear Tom:
qdmI.Golder
Associates
Our ref: 943-1622
Golder Associates Inc. is pleased to present the results of our foundation
recommendations for the proposed addition to K-Mart store #4480, Renton, Washington.
The purpose of this study was to review the earlier geotechnical report and addendum
by Klohn Leonoff Inc., re-evaluate the liquefaction risks and consequences, and develop
pile design recommendations for foundation support of the proposed addition. Our
work was completed in general accordance with our scope under task 1 of our proposal
to William Polk Associates dated April 6, 1994.
Specific issues that are addressed in this letter report include the following:
• evaluation of the liquefaction potential of the on site soils,
• pile design recommendations,
• estimates of seismic displacements, and
• comments on pile installation.
Based on the results of our analysis, the proposed project appears feasible from a
geotechnical standpoint, provided the addition is supported on a pile foundation. The
results of our analysis indicate that the loose to medium dense sands and silts below the
water table have a high risk of liquefaction under typical earthquake design peak
horizontal accelerations of 0.2 g to 0.3 g. However, the pile foundations can be designed
to support the estimated down drag loads and lose of lateral soil suppo �Erint
OF�ON
liquefaction. E I V E D
PROJECT AND SITE DESCRIPTION
NOV - 1 1994
The project consists of adding an addition to the existing K-mart Store #14VA.CV463DIVISION
southeast of the corner of Rainer Ave. and South 3rd Place, in Renton, W-3-srungton.
Design drawings by William Polk Associates, dated August 18, 1994, show a proposed
Q- I -x 3'�
OFFICES INAUSTRALIA, CANADA, GERMANY, HUNGARY, ITALY, SWEDEN, UNITED KINGDOM, UNITED STATES
October 24 1994 2 943-1622
85-foot extension of the main building to the north, combined with an adjoining auto
service center and new garden center. The finished floor elevation will match the
existing building floor slab elevation of about 26 feet, with anticipated maximum floor
slab loads of 300 pounds per square foot. Information on the plans provided to us
indicated a lightly loaded one-story building with load bearing walls with loads of 2 to 3
kips per lineal foot and column loads of up to 140 kips.
At the time of Golder Associates' involvement with this project, the proposed addition
and foundation had been designed. The previous geotechnical report, by Klohn Leonoff,
gave several options for foundation support of the proposed building and floor slab, and
it is our understanding an auger -cast pile foundation and structural floor slab were
selected for support of the building.
It is our understanding the existing 84,000-square-foot building is supported on a
spread -footing foundation with slab -on -grade floor support and was constructed in the
early 1970's. It is reported that the site was preloaded to limit post -construction
settlements and a prism of structural fill was placed under the foundation elements.
Topographic relief across the entire site is on the order of 4 feet, but is nearly level in the
proposed expansion area. It is our understanding that the area to be developed contains
the existing garden shop and adjacent asphalt surfaced parking areas.
PREVIOUS WORK
Klohn Leonoff Inc. performed a subsurface investigation and produced a geotechnical
engineering report for the proposed project in the summer of 1992 (Klohn Leonoff, 1992).
A subsequent addendum dated August 20, 1992 addressing lateral pile capacities and
potential free -field deflections in the event of liquefaction during the design earthquake.
Five borings were advanced to depths of up to 35 feet across the site during Klohn
Leonoffs subsurface investigation.
SUBSURFACE CONDITIONS
The subsurface conditions were interpreted from the previous borings performed for
Klohn Leonoff s the geotechnical report, dated July 1, 1994. Please refer to this report for
locations and detailed boring descriptions and laboratory test results.
Based on the borings by Klohn Leonoff, the site is generally underlain by varying
thicknesses of fill, over loose silty sands and soft silts to a depth of 15 feet below the
ground surface. Below 15 feet, generally dense sands, gravelly sands, or stiff silts were
encountered in the borings. Groundwater was encountered in all of Klohn Leonoff's
borings at about 7 feet below the existing ground surface.
For our pile foundation and liquefaction analysis, we have assumed an average soil
profile that consists of the following:
0-3 feet, loose, moist, granular fill, native sands or sandy silt, blow counts
Golder Associates
October 24 1994 3 943-1622
(N) ranging from 2 to 12 blow counts, material is quite variable;
• 3-7 feet, soft, low -plastic, wet clayey silt, Plasticity Index (PI) in the 10 to 20
range, N ranging from 2 to 5;
• 7-10 feet, soft, low -plastic, saturated clayey silt, PI in the 10 to 20 range, N
from 2to5;
• 10-15 feet, loose/medium dense, saturated sand to silty sand, N ranging
from 7 to 18, silt content from 10 to 33%; and
• 15-35 feet, dense, saturated sand, gravely sand or stiff, saturated silt, blow
counts ranging from 11 to 88, this material is quite variable.
CONCLUSIONS AND RECOMMENDATIONS
General
Based on our review of the previous geotechnical subsurface information and the results
of our geotechnical engineering study, we concur with Klohn Leonoffs recommendation
regarding supporting the proposed addition, to K-Mart Store #4480, on an auger cast pile
foundation combined with a structural floor slab. Other options are available for
foundation support, however, the liquefaction risk and potential for compressible
settlement at this site prevents the use of spread footings and slab -on -grade construction
unless substantial ground improvement is accomplished.
Liauefaction Analvsis
Liquefaction refers to a temporary condition in which vibrations or ground shaking,
usually from earthquake forces, results in high pore pressure and subsequent loss of
shear strength. In general, soils that are most susceptible to liquefaction include soft
sandy silts and loose fine sands. For the proposed project, the liquefiable soils include
the loose to medium dense sands below the water table. Although the test results
indicated it to be plastic and non -susceptible to liquefaction, we also treated the clayey
silt unit as being essentially non -plastic and susceptible to liquefaction. This is
conservative and reflects the possibility that some of the unit may grade to non -plastic
silts. The major implications of liquefaction for this project are the potential loss of lateral
pile support and the potential for settlement of the soils creating a vertical down -drag
force on the upper portion of the piles. Although the soils were not investigated below
the existing building, liquefiable soils likely occur below the existing building footprint.
The liquefaction potential of the on -site soils was evaluated using Harder and Seed's
(1991) method of analysis, which determines whether the soils can liquefy during a large
seismic event. Using this approach, we found that there is a potential for liquefaction of
the loose to medium dense sand, silty sand, and soft plastic silt layers below the
groundwater table for a seismic event that produces peak ground accelerations on the
order of 0.2 to 0.3 g. Horizontal ground accelerations of this magnitude could be
produced by a magnitude 7.0 earthquake, which would be representative of the Uniform
Building Code (UBC) zone 3.
Golder Associates
October 24, 1994 4 943-1622
Based on this analysis, the potentially -liquefied zone is generally located 7 to 15 feet
below the existing ground surface. Due to the limited thickness of the material,
liquefaction is not expected to significantly reduce the axial capacity of the piles.
However liquefaction of this layer would reduce the lateral resistance of the soil and
increase the deflection of the pile under the lateral load.
Liquefaction has been known to induce lateral spreading of the ground on slopes as flat
as a few degrees. There is no rigorous method to evaluate the risk of lateral spreading.
As discussed in the Klohn Leonoff August 1992 report, the theoretical maximum limits of
lateral movements could be quite large if spreading occurs. It is not practical to design
the foundation for the new addition to resist these maximum theoretical movements.
Ground densification is also not practical since it would likely damage the adjacent
existing structure. Even if the new addition could be designed for lateral spreading, the
adjacent existing structure would not resist lateral spreading. However, in our opinion
the risk of lateral spreading at this site is small due to the flat slopes and limited
thickness of liquefiable soils. Thus it is considered appropriate to ignore the condition of
lateral spreading in the design of the foundation provided the owner understands that
there is a small residual risk that lateral spreading could damage the structure.
Pile Foundations
General
Auger -cast piles are considered appropriate for this project because they can be installed
next to the existing structure with minimal ground disturbance and vibration.
Installation of driven piles could cause damage to the existing structure. The
disadvantage of auger -cast piles is that they are more sensitive to the contractor's
installation methods. For this reason, we recommend that only pre -qualified,
experienced, auger -cast -pile contractors be considered and installation of all piles be
observed by a geotechnical engineer or his representative.
An auger -cast pile is formed by drilling with continuous flight augers to a set depth and
backfilling the hole with grout, pumped though the hollow stem, as the auger is steadily
withdrawn. Pre -tied or welded rebar cages can be pushed down into the unset grout to
provide internal reinforcing.
Auger -cast piles can be designed and installed at various diameters. We are providing
design recommendations for a 16-inch diameter auger cast pile foundation which are
shown on the current design drawings.
Vertical Capacity
Based on the subsurface borings by Klohn Leonoff and our analysis, we recommend a
60-kip allowable vertical capacity for a properly installed auger -cast pile embedded 10 feet
into bearing soils consisting of dense deposits below the potentially liquefiable zone. For
a 16-inch diameter, properly installed auger cast pile, embedded 15 feet into dense
deposits below the potentially liquefiable zone, we recommend a 75-kip allowable vertical
capacity. These allowable capacities include a reduction of 15 kips due to down drag
imposed on the pile by settlement of the upper soils following a liquefaction event.
Golder Associates
October 24, 1994 5 943-1622
Based on this design criteria, average lengths of 25 to 30 feet are estimated for 60-kip and
75-kip axial design loads, respectively.
Uplift Capacity
Uplift pile capacity develops as a result of side friction between the pile and the adjacent
soils. For 10 feet of embeddment in dense, bearing soils, a 16-inch diameter auger cast
pile can be designed with an allowable uplift capacity of 20 kips. An allowable uplift
capacity of 30 kips is recommended 16-inch auger cast pile embedded 15 feet into dense
bearing soils. Piles subjected to uplift must have internal reinforcing capable of
transferring the uplift forces to the portion of the pile below the potentially liquefiable
zone.
Lateral Deflection
To compute lateral deflection of the pile during a potential liquefaction event, a computer
program, LPILE (Reese and Wang, 1993) was used. This program calculates deflection,
shear, moment, soil reaction and total stress along the pile shaft. A fixed head pile was
assumed in the analysis, based on discussions with the structural engineer. To simulate
liquefaction of the soil layer from 7 to 15 feet below the ground surface, the friction angle
of the soil was assumed to be zero and with a nominal cohesion. To allow for reduced
soil strength of the non -liquefied deposits during a seismic event, the cyclic loading
option on the LPILE program was used during the analysis. A total of 30 loading cycles
were select during the computer run in order to simulate the design earthquake. The
following soil properties were used in the LPILE analysis to simulate a single pile:
• 0 - 3 ft. Friction Angle = 30 deg.
Cohesion = 0
Effective Unit Weight = 115 pcf (0.067 pci)
Modulus of Subgrade Reaction = 25 pci
• 3 - 7 ft. Friction Angle = 0 deg.
Cohesion = 200 psf (1.389 psi)
Effective Unit Weight = 110 pcf (0.067 pci)
• 7- 15 ft. Friction Angle = 0 deg.
Cohesion = 5 psf (0.035 psi)
Effective Unit Weight = 53.6 pcf (0.031 pci)
• 15 - 30 ft. Friction Angle = 38 deg.
Cohesion = 0
Effective Unit Weight = 67.4 pcf (0.039 pci)
Modulus of Subgrade Reaction = 125 pci
The pile was modeled as a 16-inch diameter concrete pile with a modulus of elasticity of
4 X 106 psi. To simulate group effects for piles spaced 2.5 to 3 pile -diameters apart, the
modulus of subgrade reaction was reduced to 25% of that for a single pile. A reduction
of this magnitude to the modulus of subgrade reaction is considered to be conservative
for pile groups that only have two or three piles in line with lateral loading.
Golder Associates
October 24, 1994 6 943-1622
The LPILE program was run for a 30 foot long 16-inch diameter auger cast pile for 5-, 10-
and 15-kip lateral loads for a single pile and pile groups. The loading criteria is based on
discussions with the structural engineer. Group pile loading is based on two piles spaced
at 2.5 times the pile diameter, in the line of the direction of lateral loading. Table 1 lists
the calculated deflections and maximum moments from the LPILE program. The output
for the 10-kip single pile run and influence diagrams, for six runs from the LPILE
program are attached to this letter report.
Settlement
If properly installed, the pile foundation is anticipated to settle less than 1/2 inch with
differential settlements of about 1/4 to 1/2 inch.
TABLE 1
LPILE CALCULATED LATERAL PILE DEFLECTIONS
Pile Loading
Lateral Load Per Pile
(kips)
Deflection at
Top of Pile (in)
Maximum Moment
(k-in)
single
5
0.12
-279
group
5
0.26
-395
single
10
0.36
-673
group
10
0.60
-847
single
15
0.72
-1,163
group
15
0.98
-1,327
Pile Spacing
A minimum center -to -center pile spacing of 2.5 times the pile diameter is recommended
for design.
Pile Caps
Pile caps along the exterior of the building should extend a minimum of 18 inches below
exterior ground surface to minimize the risk of frost heave.
Pile Installation Criteria
Strict quality control of auger cast pile installation is required as the structural integrity of
the pile is sensitive to operator control. Structural integrity of the pile could be
Golder Associates
October 24, 1994 7 943-1622
compromised by incomplete filling of the pile hole, discontinuities along the shaft and
reduction of cross sectional area. Also, as based on the soil borings, the depth to bearing
soils varies across the site. For these reasons, we recommend a geotechnical engineer or
his representative observe the installation of all piles to verify adequate embeddment into
bearing soils and proper installation.
As recommend by Neely (1991), when drilling, the auger should be advanced at a steady
rate. At the required depth, the auger should be raised to one to two feet while positive
rotation is maintained. After grout pressure is built up and a volume equivalent to two
feet of pile is discharge, the auger should be relowered to the original depth and
sufficient grout pumped to create a minimum five foot grout head above the auger. The
should than be withdrawn at a rate consistent with grout supply while maintaining
positive rotation of the auger to retain the soil on the auger and to insure the grout fills
the entire pile cross section. In order to minimize the undesirable effect of soil
decompression (i.e. when the auger is tending to transport soil to the surface faster than
it is penetrating the ground) equipment with at least 20,000 ft-lb of torque and auger
pitch equal to one-half the diameter should be used.
At all times, the volume of grout pumped must be greater than the theoretical volume of
the hole created by the auger. The volume of grout used for each pile should be
measured and should be greater than 1.4 times the theoretical volume. For saturated
alluvial deposits it is not uncommon to have actual grout volumes of up to 1.6 time the
theoretical volume.
Upon withdrawal of the auger, a short steel sleeve should be placed at the top of each
pile to prevent contamination of the grout by the surrounding soil and provide a level
pile at the design elevation of the butt. Reinforcing steel is typically installed by pushing
rebar or a pre -fabricated cage into the unset grout. As a minimum, we recommend that
the piles be design with one centralized rebar which extends the full length of the piles.
The purpose of the centralized rebar is to confirm the pile has a continuous grout column
and there is no discontinuities or soil necking along the pile shaft.
Installation of adjacent piles should be avoided until the grout has set a minimum of 24
hours. If the grout surface subsides from installation of adjacent piles, that pile should be
abandoned and redrilled.
Pile Load Verification
Provided the pile installation is monitored by a geotechnical engineer or his
representative and no pile damage is noted, load verification tests are not recommended.
Golder Associates
October 24 1994 8 943-1622
Existine Buildine/Addition Interaction
As the existing building is supported on spread footings and the proposed addition on
piles, the two structures will likely behave differently during a seismic event. Discussions
with the structural engineer indicate that during a seismic event, the existing building
and proposed structure will have horizontal deflections similar in magnitude to those at
the foundation. Assuming that the two buildings are out of phase during an earthquake
and based on the LPILE results, horizontal foundation deflection at the connection of the
two structures is estimated to be two times the calculated lateral pile deflection.
If liquefaction is induced by a seismic event of sufficient magnitude and duration, the
ground surface will settle as the pore pressures dissipate and the liquefied deposits
density. As the new addition is proposed to be founded on a pile foundation with a
structural floor slab, settlement of the ground surface would only impact the existing
building, which is founded on spread footings. Based on the scenario of eight feet of soil
liquefying during the design earthquake, we estimate vertical ground settlements on the
order of 2 to 4 inches. As the liquefiable soils are of alluvial origin and tend to vary in
density, consistency and thickness over relatively short distances, liquefaction typically
would not be uniform across the site and differential settlements of up to 1/2 the total
settlement could be expected.
Long term settlement of the existing structure may continue over time as the soil creeps,
or the possibility of lower of the groundwater table. We estimate up to one inch of long
term vertical settlement of the existing building relative to the proposed addition.
To allow for vertical and horizontal settlements between the two structures, we
recommend the two buildings be structurally isolated from each other and also allow for
the estimated horizontal displacement during the design seismic event. This could be
accomplished by providing a non -loading carrying joint between the two structures and
a minimum open space.
CLOSURE
The conclusions and recommendations presented in report are based on subsurface
explorations by others, and geotechnical analysis by Golder Associates Inc. The integrity
of the foundation depends on proper site preparation and construction procedures. We
are available to provide geotechnical engineering services during the construction and
design phases of this project.
Golder Associates
October 24, 1994 9 943-1622
We appreciate the opportunity to provide you with this information. If you have any
questions, please contact us.
Respectfully submitted,
GOLDER ASSOCIATES INC.
1
lRobe
D. Luark, P.E.
hni al ngineer %
11 um, -� \
Principal
RDL/RLP/cla
•.1
_, i0,
7 524
SfQ14ALW
�+RES �
Golder Associates
October 24, 1994 10 943-1622
REFERENCES
Klohn Leonoff, Inc (July, 1992), "Subsurface Investigation and Geotechnical Engineering
Report Proposed K Mart Addition, Store # 4480, Renton Washington"
Klohn Leonoff, Inc (August, 1992), "Addendum To the Geotechnical Report Store # 4480"
Neely, W.J., (1991). 'Bearing Capacity of Auger -Cast Piles in Sand." Journal of Geotechnical
Engineering, Vol. 117 No. 2, ASCE, 331-345.
Reese, L.C., and Wang, S. (1993), 'Documentation of Computer Program LPILE, Version
4.0", Ensoft, Inc., Austin, Texas
Seed, R.B., and Hardner, L.F., Jr. (1990), "SPT-Based Analysis of Cyclic Pore Pressure
Generation and Undrained Residual Strength:, Proc. of H. Bolton Seed Memorial Symposium,
Berkeley, CA, Vol II, 351-376.
Golder Associates
APPENDIX A
Golder Associates
APPENDIX A
I. DEFLECTION, MOMENT, AND SHEAR DIAGRAMS FROM LPILE PROGRAM
FOR:
A. fixed head, 5 kip lateral load
B. fixed head, 10 kip lateral load
C. fixed head, 15 kip lateral load
D. fixed head, modulus of subgrade reaction reduced to account for pile group
effects, 5 kip lateral load
E. fixed head, modulus of subgrade reaction reduced to account for pile group
effects, 10 kip lateral load
F. fixed head, modulus of subgrade reaction reduced to account for pile group
effects, 15 kip lateral load
II. LPILE OUTPUT FOR 10 FIXED HEAD, 10 KIP LATERAL LOAD
Golder Associates
APPENDIX B
Golder Associates
Depth (Inches)
to r r r r r
O Co O O O O Co o 0 o
O I
rmTMTFT
A
O
.................. .............. ..... ..... .....
C
.........}........�......... }........ {.........: ............... ....... :..............
I
N
A
7
K
Nu
_ ...... ..... ...... _ ..... ...... ...
.................i.........;......... i r.........}........ ........:........
O
[[
m D
N
.
........ _.......................:.................. ........:... .. ... ... .. .. ............
V
-v
m-
mo m
..... ................... ...... ..... ................... ..... ......
0
o
moam
0
C mD
..... ...... ...
n
Np
A
v,pZ
-pmm
ro-°
o
;
�-.�r
'Mom
M
OC C
M
nv=iiF
0.00
0
20
40
60
d
80
r
U
C
►" 100
v
r
d 120
C
140
160
180
200
Deflection (Inches)
0.10 0.20 0.30 0.40
RUN? G5.GRF
Cntl-P to Print Screan
FIXED HEAD SINGLE PILE WITH SOIL
SUBGRADE MODULUS REDUCED TO ACCOUNT
FOR PILE GROUP AT 5 KIP LATERAL LOAD
POLK/KMARK/WA
PROJECT NO.943 1622 DRAWING NO, 53549 DATE IW4/94 DRAWN BY EA Golder Associates
Shear(Pounds) C1000' s)
2.0 3.0 4.0 5.0 6.0
O
2 O ...... ..... ..... ..... .. ...... .....
40 .............. ......... .......:......... i................... {.........
60 ...... .....
n
m80 .. .................... :......... .................. ......... .........
t
C
100 t t i
t
a120 ...... ..... ..... ..... ..................
C
140 :.........:........:.........'.........:..........I........:.........
160 i........:.........c.......... :........:.........i........c.........
1 8 D;.......... '......... i.........
;........i................... :........
.
200
RUN7GS.GRF Cnt1-P to Print Scream
FIXED HEAD SINGLE PILE WITH SOIL
SUBGRADE MODULUS REDUCED TO ACCOUNT
FOR PILE GROUP AT 5 KIP LATERAL LOAD
POLKNMARKMA
eHWtGI NO.943 1622 UHAWING NO. 53550 DATE IW4/94 DRAWN BY EA Golder Associates
Deflection (Inches)
0.00 0.20 0.40 0.60 0.90
C
210
40
60
BO
100
120
140
160
100
200
RUN7G10.GRF
Cntl-P to Print Screen
FIXED HEAD SINGLE PILE WITH SOIL
SUBGRADE MODULUS REDUCEDTO ACCOUNT
FOR PILE GROUP AT 10 KIP LATERAL LOAD
POLK/KMARK/WA
PROJECT N0. 943 1622 DRAWING NO. 53551 DATE 1=4194 DRAWN aV EA Golder Associates
Moment (Inch -Pounds) C1000000's)
-1.0 -0.5 0.0 0.5 1.0
O
20
40
60
80
100
120
140
160
180
200
;.........,........: ......:.........�........... .......
;..........
:.................. i......... ......... i......... >........t.........
RUN7G10.GRF
Cntl-P to Print Screen
FIXED HEAD SINGLE PILE WITH SOIL
SUBGRADE MODULUS REDUCED TO ACCOUNT
FOR PILE GROUP AT 10 KIP LATERAL LOAD
POLK/KMARKMA
PROJECT NO. 9431622 DRAWING NO. 53552 DATE 1012494 DRAWN BY EA Golder Associates
Shear(Pounds) (1000's)
4.0 6.0 8.0 10.0 12.0
O
20 .. ...... ...... ..... ...... ... .................
40 .. ...... .......i. ...................
60 _ .. .......... _ .......................
n
M80 .. ..c .........................}........F.. ...... .�...........
t
u
C
100
L
rr
Q 120 ..... ..... ...... .......
d
G
140 .. ..... ..... ..... ..... ..... .....
160 ..... ..... ......
1 S O ...?..........................'..................}.................
200
RUN7G10.GRF
Cntl-P to Print Screen
FIXED HEAD SINGLE PILE WITH SOIL
SUBGRADE MODULUS REDUCED TO ACCOUNT
FOR PILE GROUP AT 10 KIP LATERAL LOAD
POLK/KMARK/WA
PROJECT NO. 943 1622 DRAWING NO. 53553 DATE 10/24194 DRAWN BY EA Golder Associates
pa
JZir
aoO
y
O
60
LLJIL
M
�.
� O
d
O.pJ
o
W
d
oQY
Z a r
CC
W
...... ......
J
=�O
p a oc
c
.. ...... .....
X0W
........................_..........
o a
o
Wi
O
...................................' t. ......}................... i........:.........
00
y
......... ..... ................... ... ............. _........
ri
(A
w
a
:..................
•�
o-
i..........
.......... ......... ..........
2
0
N
60
O O O
ro a �o co O cQv p
cco O
(sayZ)Ul) gld-a
k,
Moment <Inch -Pounds) (1000000's)
-2.0 -1.0 0.0 1.0 2.0
O
20
40
60
80
100
120
140
160
ISO
200
............. N...... ......... ........ ............................
RUN7G15.GRF
Cnti-P to Print Screen
FIXED HEAD SINGLE PILE WITH SOIL
SUBGRADE MODULUS REDUCED TO ACCOUNT
FOR PILE GROUP AT 15 KIP LATERAL LOAD
POLK/KMARK/WA
PROJECT NO.943 1622 DRAWING NO. 53555 DATE 1W494 DRAWN BY EA Golder Associates
J F— p Q
Z
m
(n m O cr
u
H V
Q
�Q[Co
L
Wa
J �F-
a
o
LU W
V
a
(� p Y
Zptn
.,
W �--
U)
-�+
C (/)
........................................ ...... i................... :........ ........
W J a.
u a
=DO
p O cc
..... ...... ..... ...
X2W
o
v......
........................_.....
"oa
IA
N
.... j. ..... ...... ......:........{...... .... .....
(�
00
a...
L
_ ..... ......
_. .... :... .... ...... ......
N
lA
� O
d
H..
t
...... ..... .�. .. ...... ..... ...... ..... ...... .....
.�.
Q! O N O
�•1 .-� al rl .� N
(say,auI) g4aap
III
G1
cc
a
O
M
U)
a
L
C1
v
O
a
...1 F-- p a
ZQ
U)DOcc
d
d
=U §
"
�QMO,
++
w 0 LLJ a
a`
a J
UpY
a
ZW4-)
O
N
Q�0.
............................:......
= J 0
O
o
..... ..... ..... ......
pQU
C.....
.....
X 2
J
:........_:....................
wwa
........ ....... ...... ..... ...... ....
cc
. .............. ......... ........ i......... f........ .....
m U.
ai
_..... ....._............................................... .....
1
W
(n
N
V
O
z.
N..
............ ... ... ..�..... ... ;......... {... ......�........ {..........
cc
O
_
... ...... ..... ...... ...... ..... ...... ... .. ...... .....
°
(Y
O
O O O O O a 0 0 G O
O
rl .•� .1 .� ,� N
(sa4)uI> 41da4
k
0
m
c
z
W
C
Ql
�>
v
�m-n
mom
0vv
�r-rn
ainv
�mN
v,vz
0
A C r
mom
�
.�
-UmOm
°MD*
W
ro=
n=
n
moCc
Dv-ir
Depth (Inches)
N r r r r r
0 o gCo
0
0 0 0
N
700 0
7�
IF T q o
.... ...... ..... ...
.........t.........:........:.........'y.........
..... ....... .......�...
........�.........s........: ......
...._ ..... _ ..... ..... _ .•• 1.�
0
a
0
O
�l
R..... •...rr .. ,r... .. ... ... ..... ..... ..... ...... .....
....:................... :.........
.........
........ . ..... ...................
�....�........ �.........j.........:
.........y........
T..... ... ... ...r. rrr.. ...... ..... .....
...... .....
N p m N Oa 00
•� •� ,� rl "� N
(sayauI) Nlaaa
J I— Cl a
U)=0�
O�
I=UQ
�<
Wa
J 0 F"
a � J
W
�QY
F�o
L� (n Q
w-ja
=DO
W 0 O
x2W
ULWJ
°aa
CC M
m O
Cn
_.- •. rr.w+-�
1 ,
Moment <Inch -Pounds) C1000000's>
-1.0 -0.5 0.0 0.5 1.0
O
20
40
60
80
100
120
140
160
180
200
j.........:.........�.........;........i......... y........ ;.......
..1
RUN 7 E10. OW
Cntl-P to Print Scre an
FIXED HEAD SINGLE PILE WITH SOIL
SUBGRADE MODULUS REDUCEDTO ACCOUNT
FOR PILE GROUP AT 10 KIP LATERAL LOAD
POLKNMARKMA
PROJECT NO. 943 1622 DRAWING NO. 53560 DATE ID124194 DRAWN BY EA
Golder Associates
W
mC
O�
M
�v
r'm-n
DOm
mov
cr-
=
MCn
aNv
�mcn
ooz
xCr
umm
nom
-UM 0m
�rn� 0=
0
r
nZ0
nG—Ir
z
a
I
vi
Depth (Inches)
Co
O O 0 O D O n N
................ ..... ..... .... .. .....y4
r
0
0
7
Cn
C
-n Ca
O0
M M
.2 a
r= m -n
Moo
CT r-
YCD
>Nv
im(n
0 10Z
ACM
Mmm
nod
-Umom
0
z:,rn�
moo=
mprcn
> 00
I F
P
R
�r
V
0
N
n
Z
0
Depth (Inches)
O O O O O O O O O O
O O
O
0
O
0
Co
O
Mo++en t ( I ncFr Pounds ) (1000000' r )
-1.5
-1.0 -0.5 0.0 0.5
O
20
.. ...... ...... .....
40
:..................I.... ............. i......... y........ ;.........
so......
..... ..... .................. .....
n
aeo
v
.................:.................. .........................
r
u
c
100
..... ...... .....
t
a 120
................
c
140 ..
...... ..... ...... .................. .... .....
160 ..
18O....
y.......... ......... i......................... y........ ;.........
200
RUN7E15.GRF
Cnt2-P to Print Screen
FIXED HEAD SINGLE PILE WITH SOIL
SUBGRADE MODULUS REDUCED TO ACCOUNT
FOR PILE GROUP AT 15 KIP LATERAL LOAD
POLK/KMARKMA
PROJECT NO. 943 1622 DRAWING NO. 53563 DATE t0/24�94 DRAWN BY EA
Golder Associates
0.5
0
20
40
60
8 80
d
L
u
c
100
L
a 120
a
0
140
160
180
200
Shear(Pounds) (10000's)
1.0 1.5 2.0 2.5
Ililllllllll�llllllllillllllllfallll
................ ..... j.................. j......... y........ .........
..j.........:.........j................... j......... j........ {.........
RUH7E15.GW
Cntl-P to Print Screen
FIXED HEAD SINGLE PILE WITH SOIL
SUBGRADE MODULUS REDUCED TO ACCOUNT
FOR PILE GROUP AT 15 KIP LATERAL LOAD
POLK/KMARK/WA
rnwtt,1 NU, B431622 UHAWING NO. 53564 DATE 70/24/94 DRAWN BY EA Golder Associates
* PROGRAM LPILE 4.0
* (C) COPYRIGHT ENSOFT, INC., 1993
* ALL RIGHTS RESERVED
* -----------------------------------------------
* *
* Prepared for
* *
* Golder Associates
* 4104 1048 Ave. NE.
* Redmond, WA 98052
* License No. 674-092393
* *
* Program to be used only by Licensee
* Duplication permitted only for backup copy
* *
*******************************************************
PROGRAM LPILE Version 4.0
(C) COPYRIGHT 1986, 1987, 1989, 1993 ENSOFT, INC.
ALL RIGHTS RESERVED
RENTON K-MART LATERIAL PILE ANALYSIS - LIQUIFIED CONDITION
UNITS--ENGLISH UNITS
I N P U T I N F O R M A T I O N
*********************************
THE LOADING IS CYCLIC
NO. OF CYCLES = .30D+02
--------------------------
PILE GEOMETRY AND PROPERTIES
----------------------------
PILE LENGTH
2 POINTS
X
IN
.00
360.00
SOILS INFORMATION
-----------------
DIAMETER
IN
16.000
16.000
= 360.00 IN
MOMENT OF
AREA
INERTIA
IN**4
IN**2
.322D+04
.201D+03
.322D+04
.201D+03
X AT THE GROUND SURFACE _ .00 IN
SLOPE AT THE GROUND SURFACE _ .00 DEG.
5 LAYER(S) OF SOIL
MODULUS OF
ELASTICITY
LBS/IN**2
.400D+07
.400D+07
LAYER 1
THE SOIL IS A SAND - P-Y CRITERIA BY REESE ET AL, 1974
X AT THE
TOP OF THE LAYER =
.00 IN
X AT THE
BOTTOM OF
THE LAYER =
36.00
IN
MODULUS
OF SUBGRADE
REACTION =
.250D+02
LBS/IN**3
LAYER 2
THE SOIL
IS A SOFT
CLAY
X AT THE
TOP OF THE
LAYER =
36.00
IN
X AT THE
BOTTOM OF
THE LAYER =
84.00
IN
MODULUS OF SUBGRADE
REACTION =
.000D+00
LBS/IN**3
LAYER 3
THE SOIL
IS A SOFT CLAY
X AT THE
TOP OF THE
LAYER =
84.00
IN
X AT THE
BOTTOM OF THE LAYER =
120.00
IN
MODULUS OF SUBGRADE
REACTION =
.000D+00
LBS/IN**3
LAYER 4
THE SOIL
IS A SOFT CLAY
X AT THE
TOP OF THE
LAYER =
120.00
IN
X AT THE
BOTTOM OF THE LAYER =
180.00
IN
MODULUS OF SUBGRADE
REACTION =
.000D+00
LBS/IN**3
LAYER 5
THE SOIL
IS A SAND -
P-Y CRITERIA BY
REESE ET
AL, 1974
X AT THE
TOP OF THE
LAYER =
180.00
IN
X AT THE
BOTTOM OF THE LAYER =
360.00
IN
MODULUS OF SUBGRADE
REACTION =
.125D+03
LBS/IN**3
DISTRIBUTION OF EFFECTIVE
UNIT WEIGHT
WITH DEPTH
10
POINTS
X,IN
WEIGHT,LBS/IN**3
.00
.67D-01
36.00
.67D-01
36.00
.64D-01
84.00
.64D-01
84.00
.31D-01
120.00
.31D-01
120.00
.31D-01
180.00
.31D-01
180.00
.39D-01
i
360.00
.39D-01
DISTRIBUTION OF STRENGTH PARAMETERS WITH DEPTH
10 POINTS
X,IN
C,LBS/IN**2
PHI,DEGREES
E50
.00
.000D+00
.300D+02
-----
36.00
.000D+00
.300D+02
-----
36.00
.139D+01
.000
.200D-01
84.00
.139D+01
.000
.200D-01
84.00
.35OD-01
.000
.200D-01
120.00
.35OD-01
.000
.200D-01
120.00
.35OD-01
.000
.200D-01
180.00
.35OD-01
.000
.200D-01
180.00
.000D+00
.380D+02
-----
360.00
.000D+00
.380D+02
-----
BOUNDARY AND LOADING CONDITIONS
------------------------------
LOADING NUMBER 1
BOUNDARY CONDITION CODE
LATERAL LOAD AT THE PILE HEAD
SLOPE AT THE PILE HEAD
AXIAL LOAD AT THE PILE HEAD
2
.100D+05 LBS
.000D+00 IN/IN
_ .000D+00 LBS
FINITE -DIFFERENCE PARAMETERS
NUMBER OF PILE INCREMENTS = 200
DEFLECTION TOLERANCE ON DETERMINATION OF CLOSURE _ .100D-04 IN
MAXIMUM NUMBER OF ITERATIONS ALLOWED FOR PILE ANALYSIS = 100
MAXIMUM ALLOWABLE DEFLECTION = .16D+03 IN
OUTPUT CODES
KOUTPT = 1
KPYOP = 0
INC = 1
O U T P U T I N F O R M A T I O N
*********************************
LOADING NUMBER 1
BOUNDARY CONDITION CODE
LATERAL LOAD AT THE PILE HEAD
SLOPE AT THE PILE HEAD
AXIAL LOAD AT THE PILE HEAD
X DEFLECTION MOMENT SHEAR
IN
*****
.00
1.80
3.60
5.40
7.20
9.00
10.80
12.60
14.40
16.20
18.00
19.80
21.60
23.40
25.20
27.00
28.80
30.60
IN
**********
.362D+00
.362D+00
.362D+00
.361D+00
.361D+00
.360D+00
.359D+00
.358D+00
.357D+00
.356D+00
.354D+00
.353D+00
.351D+00
.349D+00
.347D+00
.345D+00
.343D+00
.341D+00
LBS-IN
**********
-.671D+06
-.653D+06
-.635D+06
-.617D+06
-.599D+06
-.582D+06
-.564D+06
-.546D+06
-.529D+06
-.511D+06
-.494D+06
-.478D+06
-.461D+06
-.445D+06
-.429D+06
-.414D+06
-.399D+06
-.385D+06
LBS
**********
.100D+05
.100D+05
.999D+04
.997D+04
.994D+04
.989D+04
.983D+04
.975D+04
.966D+04
.954D+04
.940D+04
.924D+04
.905D+04
.884D+04
.860D+04
.833D+04
.805D+04
.773D+04
= 2
.100D+05 LBS
.000D+00 IN/IN
_ .000D+00 LBS
SOIL
REACTION
LBS/IN
**********
.000D+00
-.353D+01
-.809D+01
-.138D+02
-.207D+02
-.286D+02
-.375D+02
-.477D+02
-.590D+02
-.715D+02
-.838D+02
-.969D+02
-.111D+03
-.126D+03
-.140D+03
-.154D+03
-.167D+03
-.182D+03
TOTAL
STRESS
LBS/IN**2
**********
.167D+04
.162D+04
.158D+04
.154D+04
.149D+04
145D+04
.140D+04
.136D+04
.131D+04
.127D+04
.123D+04
.119D+04
.115D+04
.111D+04
.107D+04
.103D+04
.993D+03
.958D+03
FLEXURAL
RIGIDITY
LBS-IN**2
**********
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
32.40 .339D+00-.371D+06 .739D+04-.196D+03 .924D+03 .129D+ll
34.20 .336D+00-.358D+06 .703D+04-.211D+03 .891D+03 .129D+ll
36.00 .334D+00-.346D+06 .679D+04-.510D+02 .861D+03 .129D+ll
37.80 .331D+00-.334D+06 .670D+04-.520D+02 .831D+03 .129D+ll
39.60 .329D+00-.322D+06 .660D+04-.530D+02 .801D+03 .129D+ll
41.40 .326D+00-.310D+06 .651D+04-.540D+02 .771D+03 .129D+ll
43.20 .323D+00-.299D+06 .641D+04-.550D+02 .743D+03 .129D+ll
45.00 .320D+00-.287D+06 .631D+04-.560D+02 .714D+03 .129D+ll
46.80 .317D+00-.276D+06 .621D+04-.570D+02 .686D+03 .129D+ll
48.60 .314D+00-.265D+06 .610D+04-.579D+02 .659D+03 .129D+ll
50.40 .311D+00-.254D+06 .600D+04-.588D+02 .631D+03 .129D+ll
52.20 .308D+00-.243D+06 .589D+04-.598D+02 .605D+03 .129D+ll
54.00 .305D+00-.233D+06 .578D+04-.607D+02 .579D+03 .129D+ll
55.80 .302D+00-.222D+06 .567D+04-.616D+02 .553D+03 .129D+ll
57.60 .298D+00-.212D+06 .556D+04-.625D+02 .528D+03 .129D+ll
59.40 .295D+00-.202D+06 .545D+04-.633D+02 .503D+03 .129D+ll
61.20 .292D+00-.193D+06 .533D+04-.642D+02 .479D+03 .129D+ll
63.00 .288D+00-.183D+06 .522D+04-.650D+02 .455D+03 .129D+ll
64.80 .285D+00-.174D+06 .S10D+04-.659D+02 .432D+03 .129D+ll
66.60 .281D+00-.165D+06 .498D+04-.667D+02 .410D+03 .129D+ll
68.40 .277D+00-.156D+06 .486D+04-.675D+02 .388D+03 .129D+ll
70.20 .274D+00-.147D+06 .474D+04-.683D+02 .366D+03 .129D+ll
72.00 .270D+00-.139D+06 .461D+04-.690D+02 .345D+03 .129D+ll
73.80 .266D+00-.131D+06 .449D+04-.693D+02 .325D+03 .129D+ll
75.60 .263D+00-.123D+06 .437D+04-.690D+02 .305D+03 .129D+ll
77.40 .259D+00-.115D+06 .424D+04-.687D+02 .286D+03 .129D+ll
79.20 .255D+00-.107D+06 .412D+04-.683D+02 .267D+03 .129D+ll
81.00 .251D+00-.100D+06 .400D+04-.680D+02 .249D+03 .129D+ll
82.80 .247D+00-.931D+05 .387D+04-.676D+02 .231D+03 .129D+ll
84.60 .243D+00-.862D+05 .381D+04-.170D+01 .214D+03 .129D+ll
86.40 .240D+00-.793D+05 .381D+04-.169D+01 .197D+03 .129D+ll
88.20 .236D+00-.725D+05 .381D+04-.168D+01 .180D+03 .129D+ll
90.00 .232D+00-.656D+05 .380D+04-.167D+01 .163D+03 .129D+ll
91.80 .228D+00-.588D+05 .380D+04-.166D+01 .146D+03 .129D+ll
93.60 .224D+00-.520D+05 .380D+04-.165D+01 .129D+03 .129D+ll
95.40 .220D+00-.451D+05 .379D+04-.164D+01 .112D+03 .129D+ll
97.20 .216D+00-.383D+05 .379D+04-.163D+01 .953D+02 .129D+ll
99.00 .212D+00-.315D+05 .379D+04-.162D+01 .783D+02 .129D+ll
100.80 .208D+00-.247D+05 .378D+04-.161D+01 .614D+02 .129D+ll
102.60 .204D+00-.179D+05 .378D+04-.160D+01 .444D+02 .129D+ll
104.40 .200D+00-.111D+05 .378D+04-.159D+01 .275D+02 .129D+ll
106.20 .196D+00-.427D+04 .378D+04-.158D+01 .106D+02 .129D+ll
108.00 .192D+00 .252D+04 .377D+04-.156D+01 .628D+01 .129D+ll
109.80 .188D+00 .931D+04 .377D+04-.155D+01 .232D+02 .129D+ll
111.60 .184D+00 .161D+05 .377D+04-.154D+01 .400D+02 .129D+ll
113.40 .179D+00 .229D+05 .376D+04-.153D+01 .569D+02 .129D+ll
115.20 .175D+00 .296D+05 .376D+04-.152D+Dl .737D+02 .129D+ll
117.00 .171D+00 .364D+05 .376D+04-.151D+01 .906D+02 .129D+ll
118.80 .167D+00 .432D+05 .376D+04-.150D+01 .107D+03 .129D+ll
120.60 .163D+00 .499D+05 .375D+04-.148D+01 .124D+03 .129D+ll
122.40 .159D+00 .567D+05 .375D+04-.147D+01 .141D+03 .129D+ll
124.20 .156D+00 .634D+05 .375D+04-.146D+01 .158D+03 .129D+ll
126.00 .152D+00 .702D+05 .375D+04-.145D+01 .175D+03 .129D+ll
127.80 .148D+00 .769D+05 .374D+04-.143D+01 .191D+03 .129D+ll
129.60 .144D+00 .837D+05 .374D+04-.142D+01 .208D+03 .129D+ll
131.40 .140D+00 .904D+05 .374D+04-.141D+01 .225D+03 .129D+ll
133.20 .136D+00 .971D+05 .374D+04-.140D+01 .242D+03 .129D+ll
135.00 .132D+00 .104D+06 .373D+04-.138D+01 .258D+03 .129D+ll
136.80 .128D+00 .111D+06 .373D+04-.137D+01 .275D+03 .129D+ll
138.60 .124D+00 .117D+06 .373D+04-.136D+01 .292D+03 .129D+ll
140.40 .121D+00 .124D+06 .373D+04-.134D+01 .308D+03 .129D+ll
142.20 .117D+00 .131D+06 .372D+04-.133D+01 .325D+03 .129D+ll
144.00 .113D+00 .137D+06 .372D+04-.131D+01 .342D+03 .129D+ll
145.80 .110D+00 .144D+06 .372D+04-.130D+01 .358D+03 .129D+ll
147.60 .106D+00
149.40 .102D+00
151.20 .988D-01
153.00 .953D-01
154.80 .919D-01
156.60 .884D-01
158.40 .851D-01
160.20 .817D-01
162.00 .785D-01
163.80 .752D-01
165.60 .721D-01
167.40 .690D-01
169.20 .659D-01
171.00 .629D-01
172.80 .599D-01
174.60 .571D-01
176.40 .542D-01
178.20 .515D-01
180.00 .488D-01
181.80 .462D-01
183.60 .436D-01
185.40 .411D-01
187.20 .387D-01
189.00 .364D-01
190.80 .341D-01
192.60 .320D-01
194.40 .298D-01
196.20 .278D-01
198.00 .258D-01
199.80 .240D-01
201.60 .221D-01
203.40 .204D-01
205.20 .187D-01
207.00 .171D-01
208.80 .156D-01
210.60 .142D-01
212.40 .128D-01
214.20 .115D-01
216.00 .102D-01
217.80 .907D-02
219.60 .796D-02
221.40 .691D-02
223.20 .593D-02
225.00 .501D-02
226.80 .414D-02
228.60 .334D-02
230.40 .259D-02
232.20 .189D-02
234.00 .124D-02
235.80 .641D-03
237.60 .900D-04
239.40-.415D-03
241.20-.876D-03
243.00-.130D-02
244.80-.168D-02
246.60-.202D-02
248.40-.232D-02
250.20 -.259D-02
252.00-.283D-02
253.80-.304D-02
255.60-.322D-02
257.40-.337D-02
259.20-.350D-02
261.00-.360D-02
.151D+06 .372D+04
.157D+06 .371D+04
.164D+06 .371D+04
.171D+06 .371D+04
.177D+06 .371D+04
.184D+06 .371D+04
.191D+06 .370D+04
.198D+06 .370D+04
.204D+06 .370D+04
.211D+06 .370D+04
.217D+06 .369D+04
.224D+06 .369D+04
.231D+06 .369D+04
.237D+06 .369D+04
.244D+06 .369D+04
.251D+06 .368D+04
.257D+06 .368D+04
.264D+06 .368D+04
.271D+06 .346D+04
.276D+06 .302D+04
.281D+06 .259D+04
.286D+06 .217D+04
.289D+06 .177D+04
.292D+06 .139D+04
.294D+06 .104D+04
.296D+06 .709D+03
.297D+06 .395D+03
.297D+06 .818D+02
.297D+06-.237D+03
.296D+06-.562D+03
.295D+06-.891D+03
.293D+06-.122D+04
.291D+06-.155D+04
.288D+06-.186D+04
.284D+06-.215D+04
.280D+06-.242D+04
.275D+06-.267D+04
.270D+06-.290D+04
.265D+06-.311D+04
.259D+06-.330D+04
.253D+06-.347D+04
.247D+06-.362D+04
.240D+06-.376D+04
.233D+06-.387D+04
.226D+06-.397D+04
.219D+06-.405D+04
.211D+06-.412D+04
.204D+06-.417D+04
.196D+06-.421D+04
.189D+06-.423D+04
.181D+06-.424D+04
.173D+06-.424D+04
.166D+06-.422D+04
.158D+06-.419D+04
.151D+06-.415D+04
.143D+06-.411D+04
.136D+06-.405D+04
.129D+06-.398D+04
.122D+06-.391D+04
.115D+06-.383D+04
.108D+06-.374D+04
.101D+06-.364D+04
.948D+05-.354D+04
.885D+05-.344D+04
-.128D+01
-.127D+O1
-.126D+01
-.124D+01
-.122D+01
-.121D+01
-.119D+01
-.118D+01
-.116D+01
-.115D+01
-.113D+01
-.111D+01
-.110D+01
-.108D+01
-.106D+01
-.105D+01
-.103D+01
-.101D+01
-.248D+03
-.242D+03
-.235D+03
-.226D+03
-.216D+03
-.204D+03
-.191D+03
-.176D+03
-.173D+03
-.176D+03
-.179D+03
-.182D+03
-.184D+03
-.186D+03
-.178D+03
-.166D+03
-.155D+03
-.144D+03
-.133D+03
-.122D+03
-.111D+03
-.100D+03
-.898D+02
-.796D+02
-.696D+02
-.599D+02
-.505D+02
-.414D+02
-.327D+02
-.243D+02
-.162D+02
-.853D+01
-.122D+01
.571D+01
.123D+02
.184D+02
.242D+02
.296D+02
.346D+02
.392D+02
.435D+02
.473D+02
.509D+02
.540D+02
.568D+02
.593D+02
.375D+03
.392D+03
.408D+03
.425D+03
.441D+03
.458D+03
.475D+03
.491D+03
.508D+03
.524D+03
.541D+03
.557D+03
.574D+03
.590D+03
.607D+03
.623D+03
.640D+03
.656D+03
.673D+03
.687D+03
.700D+03
.710D+03
.719D+03
.726D+03
.732D+03
.736D+03
.738D+03
.739D+03
.739D+03
.737D+03
.734D+03
.729D+03
.723D+03
.715D+03
.706D+03
.696D+03
.684D+03
.672D+03
.659D+03
.644D+03
.629D+03
.613D+03
.597D+03
.579D+03
.562D+03
.544D+03
.526D+03
.507D+03
.488D+03
.469D+03
.450D+03
.431D+03
.412D+03
.394D+03
.375D+03
.356D+03
.338D+03
.320D+03
.303D+03
.285D+03
.268D+03
.252D+03
.236D+03
.220D+03
.129D+ll
.129D+ll
.129D+ll
.129D+ll
129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
262.80
264.60
266.40
268.20
270.00
271.80
273.60
275.40
277.20
279.00
280.80
282.60
284.40
286.20
288.00
289.80
291.60
293.40
295.20
297.00
298.80
300.60
302.40
304.20
306.00
307.80
309.60
311.40
313.20
315.00
316.80
318.60
320.40
322.20
324.00
325.80
327.60
329.40
331.20
333.00
334.80
336.60
338.40
340.20
342.00
343.80
345.60
347.40
349.20
351.00
352.80
354.60
356.40
358.20
360.00
-.368D-02 .824D+05
-.374D-02 .765D+05
-.379D-02 .708D+05
-.381D-02 .653D+05
-.381D-02 .601D+05
-.381D-02 .550D+05
-.378D-02 .502D+05
-.375D-02 .456D+05
-.370D-02 .412D+05
-.364D-02 .370D+05
-.358D-02 .331D+05
-.35OD-02 .294D+05
-.342D-02 .259D+05
-.333D-02 .226D+05
-.324D-02 .195D+05
-.314D-02 .166D+05
-.304D-02 .140D+05
-.293D-02 .115D+05
-.282D-02 .922D+04
-.271D-02 .713D+04
-.259D-02 .524D+04
-.248D-02 .352D+04
-.236D-02 .197D+04
-.225D-02 .583D+03
-.213D-02-.641D+03
-.201D-02-.171D+04
-.190D-02-.264D+04
-.178D-02-.343D+04
-.167D-02-.408D+04
-.155D-02-.462D+04
-.144D-02-.503D+04
-.133D-02-.534D+04
-.122D-02-.554D+04
-.111D-02-.565D+04
-.100D-02-.567D+04
-.899D-03-.562D+04
-.794D-03-.549D+04
-.692D-03-.530D+04
-.590D-03-.505D+04
-.490D-03-.476D+04
-.391D-03-.442D+04
-.293D-03-.405D+04
-.197D-03-.366D+04
-.101D-03-.325D+04
-.564D-05-.283D+04
.887D-04-.241D+04
.182D-03-.200D+04
.276D-03-.160D+04
.369D-03-.123D+04
.461D-03-.894D+03
.553D-03-.598D+03
.646D-03-.351D+03
.738D-03-.163D+03
.830D-03-.431D+02
.922D-03 .000D+00
OUTPUT VERIFICATION
-.333D+04 .615D+02
-.322D+04 .633D+02
-.310D+04 .649D+02
-.298D+04 .661D+02
-.286D+04 .671D+02
-.274D+04 .678D+02
-.262D+04 .682D+02
-.250D+04 .684D+02
-.237D+04 .684D+02
-.225D+04 .682D+02
-.213D+04 .678D+02
-.201D+04 .671D+02
-.189D+04 .663D+02
-.177D+04 .654D+02
-.165D+04 .642D+02
-.154D+04 .630D+02
-.143D+04 .616D+02
-.132D+04 .601D+02
-.121D+04 .585D+02
-.111D+04 .567D+02
-.101D+04 .549D+02
-.908D+03 .531D+02
-.814D+03 .511D+02
-.724D+03 .491D+02
-.638D+03 .470D+02
-.555D+03 .449D+02
-.476D+03 .427D+02
-.401D+03 .405D+02
-.330D+03 .383D+02
-.263D+03 .360D+02
-.200D+03 .338D+02
-.142D+03 .315D+02
-.873D+02 .291D+02
-.369D+02 .268D+02
.916D+01 .244D+02
.510D+02 .221D+02
.886D+02 .197D+02
.122D+03 .173D+02
.151D+03 .149D+02
.176D+03 .125D+02
.196D+03 .100D+02
.212D+03 .760D+01
.223D+03 .514D+01
.230D+03 .265D+01
.233D+03 .150D+00
.231D+03-.238D+01
.224D+03-.493D+01
.213D+03-.752D+01
.197D+03-.101D+02
.176D+03-.128D+02
.151D+03-.155D+02
.121D+03-.182D+02
.855D+02-.209D+02
.453D+02-.237D+02
.GOOD+00-.266D+02
.205D+03
.190D+03
.176D+03
.162D+03
.149D+03
.137D+03
.125D+03
.113D+03
.102D+03
.921D+02
.823D+02
.730D+02
.643D+02
.561D+02
.485D+02
.413D+02
.347D+02
.286D+02
.229D+02
.177D+02
.130D+02
.874D+01
.489D+01
.145D+01
.159D+01
.426D+O1
.656D+01
.852D+01
.102D+02
.115D+02
.125D+02
.133D+02
.138D+02
.141D+02
.141D+02
.140D+02
.137D+02
.132D+02
.126D+02
.118D+02
.110D+02
.101D+02
.910D+01
.808D+01
.704D+01
.599D+01
.497D+01
.399D+01
.306D+01
.222D+01
.149D+01
.872D+00
.405D+00
.107D+00
.GOOD+00
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
.129D+ll
THE MAXIMUM MOMENT IMBALANCE FOR ANY ELEMENT = .276D-05 IN-LBS
THE MAX. LATERAL FORCE IMBALANCE FOR ANY ELEMENT =-.849D-06 LBS
OUTPUT SUMMARY
PILE -HEAD DEFLECTION = .362D+00 IN
COMPUTED SLOPE AT PILE HEAD = .216D-15
MAXIMUM BENDING MOMENT =-.671D+06 LBS-IN
MAXIMUM SHEAR FORCE _ .100D+05 LBS
NO. OF ITERATIONS = 15
NO. OF ZERO DEFLECTION POINTS = 2