Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutSWP273531 (9)Jrnw 4r Treatment Technologies
http://www.ecy.wa. ogi...
Ecology home > Water Quality > Stormwater >Evaluation of Emerging Stormwater Treatment Technologies >
Stormwater Treatment Technologies
Types of Stormwater Treatment Technologies Approved through TAPE and
CTAPE
The following list separates the types of treatment technologies, defines them and lists
manufacturers who make them.
• Pretreatment
• Oil Treatment
• Enhanced Treatment
• Phosphorous Treatment
• Construction Site
Ecology's use level designation is also listed as an acronym for each manufacturer:
GULD - General Use Level Designation
General Use Level Designation (GULD) technologies may be used Washington subject to
use level designation conditions.
CULD - Conditional Use Level Designation
Conditional Use Level Designation (CULD) allows continued use of the technology for a
specified time period during which field testing must be completed by the vendor and/or
developer. Not all CULD technologies are required to conduct field testing. Units that
are in place do not have to be removed after the specified time period. Use is subject to
the use level designation conditions.
PULD - Pilot Level Use Designation
Pilot Use Level Designation (PULD) allows limited use of the technology to allow field
testing to be conducted. PULD technologies may be installed provided that the vendor
and/or developer agree to conduct field testing based on the TAPE at all installations.
Governments covered by a municipal stormwater NPDES permit must notify Ecology
when a PULD technology is proposed (form is available in TAPE documentation). Use is
subject to the use level designation conditions.
Pretreatment
Pretreatment is generally applied to:
Project sites using infiltration treatment
I of ; 02 021 'low k �3 XM
SJrnixva e:r'Freatment Technologies hap: !'►►,n►v.ecy.wa.;ov/Programs/wq/storm►►,ater/newtech/technolog ...
• Treatment systems where needed to assure and extend performance of the downstream basic
or enhanced treatment facility.
Pretreatment is intended to achieve 50% removal of fine (50 micron -mean size) and 80% removal
of coarse (125-micron-mean size) total suspended solids for influent concentrations greater than
100 mg/L, but less than 200 mg/L. For influent concentrations less than 100 mg/L, the facilities are
intended to achieve effluent goals of 50 mg/L of fine and 20 mg/L of coarse total suspended solids.
• Aqua Shield Aqua -Swirl Concentrator (GULD)
• BaySeparator CULD@
• Environment 21 V2131 Treatment System (PULD)**
• CONTECH Stormwater Solutions Inc. CDSTM Stormwater Treatment System
GULD
• CONTECH Stormwater Solutions Inc. Vortechs System (GULD)
• Hydro International Downstream Defender (GULD)
• Stormceetor(GULD)
Back to top
Oil Treatment
Oil treatment is intended to achieve the goals of no ongoing or recurring visible sheen and a daily
average total petroleum hydrocarbon concentration no greater than 10 mg/L with a maximum of
15 mg/L for discrete (grab) samples.
• Americast filterra® system (GULD)
• Aqua Shield Aqua -Filter Concentrator (PULD)**
• (Expired) ADS Water Quality Treatment Unit (PULD)**
• Royal Environmental Systems, Inc. ecoSepTM (PULD)**
**At each site where a pilot use level designation is proposed, a Quality Assurance
Project Plan must be approved by Ecology before the device is employed.
Back to top
Basic Treatment
Basic treatment is intended to achieve a goal of 80% removal of total suspended solids for an
influent concentration range of 100mg/L to 200 mg/L. For influent concentration less than
100mg/L the effluent goal is 20mg/L total suspended solids. For influent concentrations greater
than 200mg/L a higher treatment goal is intended.
• CONTECH Stormwater Solutions, Inc. CDS_Media _Filtration System (GULD)
• CONTECH Stormwater Solutions Inc. Stormfilter using ZPG Media (GULD)
• WSDOT -•. Drain GULD)
• Americast hiter system (GULD)
• Aqua Shield Aqua -Filter Concentrator (PULD)**
• Royal Environmental Systems Inc. ecoStorm plus (PULD)**
• Kristar FloGard Perk Filterg (PULD)**
• BayFilter® (PULD)
• Hydro International, Inc. Up-FIOT`" Filter (PULD)**
• JellyfishTm Filter (PULD)
2 of 3 02/02/2010 8:53 AM
SJrmw: r Treatment Technolo-ies
http: //w ww.ecy.wa.gov/Programs/w q,'stoi-mw ater/newtecii/tec hnol ogi...
**At each site where a pilot use level designation is proposed, a Quality Assurance
Project Plan must be approved by Ecology before the device is employed.
Back to top
Enhanced Treatment
Enhanced treatment is intended to achieve a higher level of treatment than basic treatment.
Enhanced treatment is targeted at removing dissolved metals.
• WSDOT Media Filter Drain (GULD)
• Americast filterra® system (GULD)
• Aqua Shield Aqua -Filter System (PULD)**
**At each site where a pilot use level designation is proposed, a Quality Assurance
Project Plan must be approved by Ecology before the device is employed.
Back to top
Phosphorous Treatment
Phosphorus treatment is intended to achieve a goal of 50% total phosphorus removal for an
influent concentration range of 0.1 to 0.5 mg/L as well as achieving basic treatment.
• WSDOT Media Filter Drain (GULD)
• Americast filterra® system (CULD)
• Aqua Shield Aqua -Filter System (PULD)**
**At each site where a pilot use level designation is proposed, a Quality Assurance
Project Plan must be approved by Ecology before the device is employed.
Back to top
Construction Site
• Chitosan-Enhanced Sand Filtration Using StormKlearTM LiquiFlocTM 1% Solution
GULD
• Chitosan-Enhanced Sand Filtration Using FlocClearTM(GULD and CULD)
• Chitosan Enhanced Sand Filtration Using ChitoVanTM (GULD)
• Water Tectonics Electrocoagulation Subtractive Technology (CULD)
• Chitosan-Enhanced Sand Filtration Using StormKlearOLiq_uiFloc®Maximum
Strength 3% Solution (GULD and CULD}
Back to top
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.
cif 3 02/02/2010 8:53 AM
• � � .11 AVE S. ` Y
- I ..E -- _
/ CITY OF RENTON
o�GYPSY SUB -BASIN / l
DRAINAGCE
EXISTING COMM RCLAURESIDENTIAL LAND USE CD
APPROXIMATE EXTENT OF
y FORMAL WETLAND
❑ DELINEATION
V.
Q�
JONES AVE N.E.
WETLAND 7 {WETLANDS 7A(7B)
! CONTINUES OFFSITE
:.v ° 1 , TO THE EAST
} WETLAND 7B -? CREEK
D
'
J
1 r t �r i� vC x'UCSr'�AGtit
\ IN
mmr"
APPROXIMATE EXTENT OF
FORMAL WETLAND
WETLAND i DELINEATION
2 �1
PARK AVE N. na
LEGEND
L - -_ -_ _ - ' EXISTING RESIDENTIAL LAND USE
Ex STING ROAD
GYPSY SUBBASIN VIA 44TH STORNWATER POND
e
F7;= GYPSY SUBBASIN
i
yt� t e MAY CREEK SUBBASIN
9S
a iso 30D 4so,Q DIRECTION [IF FLOW
FEET � e - REFERENCE: HUGH G. GOLDSMITH & ASSOCIATES.
Associated Earth Sciences, Inc. EXISTING DRAINAGE PATTERNS AND SENSITIVE AREAS FIGURE 3-3
IN® ® pm® 1-405/NE 44TH STREET INTERCHANGE EA PROJECT NO.
REET
STREET I
w
z
g
m
CAMAS /
AVENUE
IvJRTHEAST
STREET
uj
a 1
w 2
z r-
gr0
m z
-1 47030'00"
122 ° N' 15"
To determine it flood insurance is available. contact an insurance agent or
call the National Flood Insurance Program at (800) 638-6620.
4
APPROXIMATE SCALE IN FEET
500 0 500
NATIONAL FLOOD INSURANCE PROGRAM
FIRM
FLOOD INSURANCE RATE MAP
KING COUNTY,
WASHINGTON AND
INCORPORATED AREAS
PANEL 664 OF 1725
(SEE MAP INDEX FOR PANELS NOT PRINTED)
CONTAINS:
COMMUNITY NUMBER PANEL SUFFIX
KING COUNTY.
UNINCORPORATED AREAS 530071 0664 F
RENTON. CITY OF 5300M 0664 F
MAP NUMBER
53033CO664 F
MAP REVISED:
MAY 16,1995
Federal Emergency Management Agency
Appendix B
otak
X1
122011' 15"
— t 47031'52"
(n
f—
J
IULI
Q
cr
O
Ir
O
U
X
Z'
O
Z Z
LJ
c C)
U— U
O
_Z
]L
U
RFET
-TY
s0 AREAS
,L1 RENTI�N
530088
ZONE X
y
4211���
0
N
LEGEND
SPECIAL FLOOD HAZARD AREAS INUNDATED
BY 100-YEAR FLOOD
ZONE A No base flood elevations determined.
ZONE AE Base flood elevations determined.
ZONE AH Flood depths of I to 3 feet lusually areas
of ponding); base flood elevations
determined.
ZONE AO Flood depths of 1 to 3 feet (usually sheet
flow on sloping terrain); average depths
determined. For areas of alluvial fan flooding,
velocities also determined.
ZONE A99 To be protected from 100--year flood by
Federal flood protection system under
construction; no base elevations determined.
ZONE V Coastal flood with velocity hazard (wave
action); no base flood elevations determined.
ZONE VE Coastal flood with velocity hazard (wave
action); base flood elevations determined.
FLOODWAY AREAS IN ZONE AE
L� OTHER FLOOD AREAS
ZONE X Areas of SOf>-year flood; areas of 100-year
Flood with average depths of less than
1 foot or with drainage areas less than
1 square mile; and areas protected by
levees from 100-year flood.
--7 OTHER AREAS
JI ZONE X Areas determined to be outside 500-year
floodplain.
ZONE D Areas in which flood hazards are
undetermined.
UNDEVELOPED COASTAL BARRIERS
\ \
F771
Identified
Identified
Otherwise
1983
1990
Protected Areas
Coastal barrier areas are normally located within or adjacent to Special
Flood Hazard Areas.
Flood Boundary
Floodway Boundary
Zone D Boundary
Boundary Dividing Special Flood
®
Hazard Zones, and Boundary
Dividing Areas of Different
Coastal Base Flood Elevations
Within Special Flood Hazard
Zones.
Base Flood Elevation Line;
513
Elevation in Feet. See Map Index
for Elevation Datum.
D D
Cross Section Line
Base Flood Elevation in Feet
(EL 987)
Where Uniform Within Zone.
See Map Index for Elevation Datum.
RM7
X
Elevation Reference Mark
0 M2
River Mile
Horizontal Coordinates Based on North
97007'30". 32022"30"
American Datum of 1927 (NAD 27)
Projection,
NOTES
This map is for use in administering the National Flood Insurance Program:
it does not nec— ilv irlant'rfv
all A —in sohteet to floodina. oarticularly from
local drainage
Special Flood
Coastal base f
the effects of
from those
s+v —tin nlammnn
Appendix B
otak
JOINS PANEL 0675
t
N
n
N
�Q
a°
o�
Q$�
OQ
NORTH 37TH SIRE
Q
'
0J
NORTH 36TH STREET
oNORTH
35TH STREET
O
NORTH 34TH STREET
z
cc
m
NORTH 33RD PLACE
NORTH
33RD STREET
r
rQ
a
NORTH
32ND STREET
-+
w
�
z
1J
LU
a
NORTH
31ST STREET
1
NORTH
30TH STREET
�.
x
cc
.,
2
NORT
Note: Datum
= 1929 NGVD
Scale: 1" = 5001
OF
DETAILED STUDY
ZONE X
I) / �
40TH STREET
ZONE
x
NORTH 38TH ST
N
REET z
ORTH
May
0
Z
MEADOW
pVE NORTHCr
37TH STREET
0
Q
w
NORTH 36TH STREET
NORTH 32ND STREET
Uj
F
47
ZONE X-
CM
77
AE
ZONE X
z
w
z
a
z
J
U
z
J
32
KINI
UNINCORI
May
NE X
ZONE
ZONE AE' "' �
NORTHEAST 30TH ZONE X
STREET
2
m
Appendix B
otak
FLOOD
INSURE
KING COUNTY,
WASHINGTON
AND INCORPORATED AREAS
VOLUME 1 OF 3
COMMUNITY COMMUNITY
NAME NUMBER
AUBURN,CITY OF ...........
530073
BELLEVUE,CITY OF ..........
530074
BLACK DIAMOND,TOWN OF ....
530272
BURIEN,CITY OF ............
530321
CARNATION,TOWN OF .......
530076
DES MOINES,CITY OF ........
530077
DUVAL,TOWN OF ...........
530282
ENUMCLAW,CITY OF ........
530319
FEDERAL WAY,CITY OF...... ,
530322
ISSAGUAH,CITY OF .........
530079
KENT,CITY OF .............
530080
KING COUNTY,
UNINCORPORATED AREAS ..
530071
KIRKLAND,CITY OF ...........
530081
LAKE FOREST PARK,CITY OF ...
530082
NORMANDY PARK,CITY OF ....
530084
NORTH BEND,CITY OF ........
530085
PACIFIC,CITY OF ...........
530086
REDMOND,CITY OF ..........
530087
RENTON,CITY OF ...........
530088
SEATLE,CITY OF ............
530089
SEATAC,CITY OF ...........
530320
SKYKOMISH,TOWN OF ........
530236
SNOGUALMIE,CITY OF .......
530090
TUKWILA,CITY OF ..........
530091
WOODINVILLE, CITY OF
530324
REVISED: MAY 16,1995
Federal Emergency Management Agency
Appendix B
otak
100
LL+{%-.t-5.
't' j'
f-j
_ _ L{.' ..1' _�.
'-,. -J-r-i
1 rj4.
'Fi
i` F-•+�+;
i+j
1., t
-{
+'{
__��- ,-r '.
T--�-t +-i
-:-. .7 -:
-��-��-•r•-T-
•rrti..i�_.-�
�.,_.,�
�.r_
T�1�-:'
r
I-�';'.
- '-r
I 'T.1
=--r
..
I 1-
, -,
�:
L: ,-
,
_IY'-iF
,
_
�•t'I
100
1
TT
-771-1 T
- 1
1
W. ��
t 1i=;
j-} Ji 1-
+'
.Z .r..+ i .. '
��..L
.—�-F
'-t
90
-r_
i i
j .l •-f.-
.J • T
1
t y II' r
•_ t 1d : {.
t _ :—a.+ r
�..�.} +1..{...
�f 1. -.
� r r,. ��..i.
'.
t
.�}.. I->_j
}_t
� I
t�
J i..."?•1
+�-i "r' -
..{.J
--
i
.i'1<.1_
`
L
,Ti
_..,
....�.
�90
.�.;..l...T1_{
..i._ -}-'.•
4-4
y"1-
1 (_
-i" '-
_ _
' -L
-
-j _
��i
I
I
F?
:
80
.a. 1.
-r`i
;� - l�
1 t
t�
I -T
80
cn
W
!. T
�.
{ I
- .L_t i
}
"I' -.
1 + 1'._.
_
-}.T
.J �-.
• 1
r-}..r+l'
_
1
`f. T.'_
I
I
y
#j'}'{-,`
O
CC
W
W
d'
�••1 jtl
L.
,
1.1i y..
_ _
T
1� t
y�' .�
.j
i
T
I
_
G.
�
It
J- 1
_
t_
..,
Wit_
I
1
7 o
o
+
E
-r•t
i it•i, y
r-F+-T
Fi'1-1 r
t +
iT
4..
1-f
y-
1 1 f*_
-
_L
'{•1
r i rl
-
_ .i-`-i.
- i }
�.._..
+,�tl_
_
60
r--i
_
�-=-••1T-
_ "
. _+ {�. -,.-:, :_
-t ' in
t J
• i'Y'
-
I_I-•--_ 8O
_ ,
.._
I1
rt
-
J
1
�;17
1,r
- Note: Datum
= 1929
NGVD
+
i
60-+
t7-
>
�.,
T
'•'.
F _...•,.� 50
4_1._1
r
1 r
jj
2
4
'�._ .. __..
.__.. ., }
f
, : : ., ..; .I
i
I
Q •
--
-
!. T i
,-! 1. , I
- 7
T 1.+
'�-i i -+-
1_.
1.1.��'•-j
•!-•1-1
i-
-
-
+- • ' i
_ .i
FI I
-� .?
1
i - i _.
t
f . + ['�"' . t
: 1 t
-r'+
-'
JJjjjj
W
Z
T
,.y. 1�
1 _i-1�-
l_
-'_T.
iJ.�
1.
14..1J1,.S
r __
._l.�p
'i
.f.��J
W
-
f
r, -i
t
y I '
iT 1 -�
30
i
�7t•
r-1-i--!-�'r•T'�'...r..i.�.
..i.�-
C9 O
LEGEND
-.1.. I
I
f..
'-1
..-t"J
'
f -!"i_IIX
lr{-
I'1 .
500-YEAR FLOOD
r2 OO
- -
I
f•:
+I�--''"
-+t 1 r.-,--1 }.
L.:... ! •..�
__.
_ 1
_1
1i
_
i_f.'_' i
i e 1�
11'; .''_'
-i
---- 100-YEAR FLOOD
-
2 V CL
ku O
20
_- `.
11�--.
�_
�. , _
.'y_ _
i
I_ _i
a•
�1�i
t_ 1. _
-
W -YEAR FLOOD
- - - - - - - 10-YEAR FLOOD
3��\��\\`r•/\\'IU\ STREAM BED
20
C7
¢ Z U
W Y Z
J O
K
-l. ��.�
W Q
'
I
1_
..
~
.: M
CROSS SECTION
LOCATION
C '
10
-
-.•y.!
1
�_�
_._
:.
�_- ��
- _ ..
__ _ La-
- _. _
W
10
0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4
LL
STREAM DISTANCE IN FEET ABOVE MOUTH Ayyendvc8
l
U9F
otak
1
11 ,
1
1
1
1
11
r e v ry1 r '`,�'' 1♦ r r v � � y r
fill
i
; R-120.00'
M21'006' R-180:00' 1 S88'48'340E
j L-86.?3' 77.10'
�yx If
HAWK'S
LANDING
HOTEL
I•IN. FLOOR a 38.0 +;+ J�•• _ '
R
ICON NE:(.
L: !�I` r i J• t DOWN
Oppp r.
dooms
,. ICU
If
�'! I // ' ��* � i 1. i I +� � h yy%• � � \ �' 1!
Amj
� , J
I I ,
—
f+ '
I 2' CPP=27.76 ,y �
1 I , r _
E
I
Steve Lee
From: Ronald Straka
Sent: Tuesday, June 22, 2010 2:54 PM
To: Clint Chase
Cc: spencer@alpertcapital.com; danmitzel@hansellmitzel.com; Steve Lee; Suzanne Dale Estey;
Vanessa Dolbee; Gregg A. Zimmerman; Steve Van Til
Subject: RE: Renton Storm and Water System Improvement Project - Pan Abode Site Letter of
Understanding - Update request
Thanks Clint. 1 appreciate your prompt response and granting my request to authorize the Surface Water Utility to
submit the permit applications for the City project, along with all your work on the letter of understanding. Have a good
vacation.
Thanks
Ronald J. Straka, P.E.
Utility Engineering Supervisor
City of Renton Surface Water Utility
Renton City Hall - 5th Floor
1055 South Grady Way
Renton, WA 98057-3232
Email: rstraka@rentonwa.gov
Ph: 425-430-7248
From: Clint Chase [mailto:ClintC@vulcan.com]
Sent: Tuesday, June 22, 2010 2:44 PM
To: Ronald Straka
Cc: spencer@alpertcapital.com; danmitzel@hansellmitzel.com; Steve Lee; Suzanne Dale Estey; Vanessa Dolbee; Gregg A.
Zimmerman; Steve Van Til
Subject: RE: Renton Storm and Water System Improvement Project - Pan Abode Site Letter of Understanding - Update
request
Ron,
The City of Renton Surface Water Utility is authorized to submit permit applications that show work on the Pan Abode
site that is owned by the Port Quendall Company, provided that final land rights (easements and dedications) are
executed prior to the construction of the proposed improvements.
The letter of understanding is routing through our approval process and should be complete in about a week. I am
leaving tomorrow on vacation for a couple of weeks, and in my absence, Steve Van Til, the head of our portfolio
management group, can answer any questions regarding any status updates. I am copying Steve here so you have his
email address.
Thanks, Clint
From: Ronald Straka [ma i Ito: rstraka @Rentonwa.gov]
Sent: Tuesday, June 22, 2010 12:04 PM
To: Clint Chase
Cc: spencer@alpertcapital.com; danmitzel@hansellmitzel.com; Steve Lee; Suzanne Dale Estey; Vanessa Dolbee; Gregg A.
Zimmerman
Subject: RE: Renton Storm and Water System Improvement Project - Pan Abode Site Letter of Understanding - Update
request
Clint,
I just wanted see if you could give me an update on the status of the letter of understanding approval. If getting the
letter of understanding finalized is going to take another week or more, I wanted to see if it would be possible to get
permission via email from the Port Quendall Company to proceed with submitting our permit application
(SEPA/Shoreline permit) for the City project in advance of the letter of understanding being completed. The permission
is needed because the City project includes the construction of the biofiltration swale and sidewalk on the Pan Abode
site. Every week that the start of the City project permitting process is delayed, the start of the City project construction
is delayed by one week. An email stating that "the City of Renton Surface Water Utility is authorized to submit permit
applications that show work on the Pan Abode site that is owned by the Port Quendall Company, provided that final
land rights (easements and dedications) are executed prior to the construction of the proposed improvements" is all
that we need in order to start the City project permit review process. The idea is to use the email to allow the permit
applications to be submitted and then place the letter of understanding in the permit file once it has been approved and
signed.
Please authorize the City to submit permit applications that includes work on the Pan Abode site this week, if it is going
to take another week or more to finalize the letter of understanding. Please also provide your best estimate as to when
Vulcan's approval of the Letter of Understanding will be completed.
Thanks
Ronald J. Straka, P.E.
Utility Engineering Supervisor
City of Renton Surface Water Utility
Renton City Hall - Sth Floor
1055 South Grady Way
Renton, WA 98057-3232
Email: rstraka@rentonwa.gov
Ph: 425-430-7248
From: Ronald Straka
Sent: Wednesday, June 16, 2010 9:34 AM
To: Clint Chase
Cc: spencer@alpertcapital.com; danmitzel@hansellmitzel.com; Steve Lee; Suzanne Dale Estey; Vanessa Dolbee; Gregg A.
Zimmerman
Subject: RE: Renton Storm and Water System Improvement Project - Pan Abode Site Letter of Understanding
Clint,
The City is willing to accept the "non -binding" section that you added to the letter of understanding (attached). We
recognize that until the final easement documents, right-of-way dedication and other documents are signed and
recorded, there is no guarantee that the requested documents will be approved by Vulcan. We trust that Vulcan
understands the importance of the items listed in the letter of understanding and will agree to approve and sign the
formal documents for the easement needed for the storm water quality treatment biofiltration swale, the WSDOT storm
system relocation and the dedication of the additional right-of-way necessary for the construction of the sidewalk on the
Pan Abode site. Based upon our phone conversation today, you wanted the non -binding clause added to help in the
review process on your end, but don't see any problems with the future approval of the easement documents. If
possible please, authorize us to submit for permit application via email, so we can get the City project permitting started
even though the full signature process of the letter of understanding has not be completed.
Please continue with routing the letter of understanding with the non -binding clause for internal approval and return
the signed letter to me or Steve Lee. We will have Gregg Zimmerman, Public Works Department Administrator, sign the
letter and send you a copy. It is important that we expedite the signing of the letter of understanding, so we can start
the permitting process for the City project and advance the project to construction, or provided us separate
authorization to submit for permit application as requested above. We will be sending you the formal easement and
right-of-way dedication documents for approval and signature by the Port Quendall Company by mid -July, which will
need to be approved prior to construction bid advertisement currently scheduled for August 171h, in order to maintain
the current project schedule.
The City project is using public funds to make significant improvements (storm system, water system and curb, gutter
and sidewalk improvements) that benefit and provide real value the Pan Abode property. We would not want to
expend (waste) these funds on developing a project design that we cannot constructed due to not being able to obtain
the easements and right-of-way needed for the construction of the public improvements. In our meeting we discuss this
as an agreement in concept, pending the opportunity to review and approve the final easement and right-of-way
dedication documents. The intent of the Letter of Understanding was to provide a high degree of confidence to the City
that Vulcan would grant the required permission to submit permit applications showing work on the Pan Abode site an
grant required land rights (easements and dedications) necessary for the construction of the public improvements.
The City approved a right-of-way vacation that granted 12,100 sf of public right-of-way to the Port Quendall Company
(Pan Abode site property owner) with the condition that an equivalent area be granted to the City for storm water
management in the southwestern portion of the Pan Abode site. The approved vacation, once the required appraisal of
the vacation area is completed and the vacation ordinance is approved, will legally obligates the property owner to
grant area to the City for surface water management, otherwise the right-of-way vacation condition would not be
satisfied and the right-of-way vacation will not be completed. As it stands City is requesting easement area that is less
than the right-of-way vacation area. The right-of-way vacation and the relocation of the WSDOT storm system to allow
the release of the existing WSDOT drainage easement on the Pan Abode site improves the value of the site by adding
more developable area and removing an encumbrance that restrict development of the site. The right-of-way vacation
and release of the existing WSDOT drainage easement on the Pan Abode site is needed in order for the Hawks Landing
Hotel project to be a viable project.
The primary items that the City needs at a minimum for construction of the City project includes the following:
1. Permission to submit permit applications that includes work on the Pan Abode Site as required by the SEPA
checklist
2. An easement for the storm water quality treatment biofiltration swale
3. Dedication of addition right-of-way needed for the construction of sidewalk in the area south of the proposed
Hawks Landing Hotel entrance.
4. A temporary construction easement to the City for the construction of the new 24-inch WSDOT storm system
along the northern portion of the site
5. An easement to WSDOT for the new 24-inch storm system along the northern portion of the site.
6. Temporary construction easements and right -of -entry for construction of slopes and installation of catch basins
The items related to right -of -entry and temporary construction easement needed for staging area are not critical items
that we can work with Vulcan and the Hotel Developer on to resolve or work out alternatives location not on the Pan
Abode site for construction staging.
We look forward continuing to working with the Port Quendall Company (Vulcan) as needed to gain the approval the
primary items in the letter of understanding that the City needs at a minimum for the construction of the City project
and to ensure that the Hawks Landing Hotel project is viable.
Thanks
Ronald J. Straka, P.E.
Utility Engineering Supervisor
City of Renton Surface Water Utility
Renton City Hall - 5th Floor
1055 South Grady Way
Renton, WA 98057-3232
Email: rstraka@rentonwa.gov
Ph: 425-430-7248
From: Clint Chase [mailto:ClintC@vulcan.com]
Sent: Monday, June 14, 2010 2:51 PM
To: Ronald Straka; Steve Lee; spencer@alpertcapital.com; danmitzel@hansellmitzel.com; Suzanne Dale Estey; Vanessa
Dolbee
Subject: FW: Renton Storm and Water System Improvement Project - Pan Abode Site Letter of Understanding
Ron,
I added some language about the letter being non -binding, which we all agreed to in our meeting. PQC's intent is to
move forward and advance the design as you have outlined in the letter. If you agree this is acceptable, then I will
continue to route for internal approval, and we can get this letter of understanding signed. Thanks for your patience.
Clint
From: Ronald Straka [mailto:rstraka@Rentonwa.gov]
Sent: Wednesday, June 09, 2010 12:59 PM
To: Clint Chase
Cc: Suzanne Dale Estey; Steve Lee; danmitzel@hansellmitzel.com; spencer@alpertcapital.com
Subject: Renton Storm and Water System Improvement Project - Pan Abode Site Letter of Understanding
Per your voice message to Suzanne Dale Estey on 6/9/10, it sounded like you wanted to make some changes to the
wording of the letter of understanding. The electronic copy of the letter understanding that the City sent you on
5/11/10 is attached for you to revise to be in the form that is acceptable to Vulcan.
The most critical items in the letter of understanding that are needed is the approval for the City to submit permit
applications that includes work on the Pan Abode Site and a commitment to grant the right-of-way dedication and
easements needed for the construction of the biofiltration swale, sidewalk and storm system construction on the Pan
Abode site. The letter of understanding will give us the assurance that we can proceed with the permitting and final
design of the project with confidence that the necessary final easements and right-of-way dedication documents would
be approved by Vulcan prior to the City advertising the project for construction.
Please revise the letter as necessary to satisfy your needs and provides a red -lined version showing the changes so we
can see how it has been changed to ensure that the revisions will satisfy our needs.
If there is anything I can do to assist you in getting approval of this letter of understanding, or if you want to discuss
proposed changes to the letter of understanding, please feel free to contact me.
Thanks
Ronald J. Straka, P.E.
Utility Engineering Supervisor
City of Renton Surface Water Utility
Renton City Hall - 5th Floor
1055 South Grady Way
Renton, WA 98057-3232
Email: rstraka@rentonwa.gov
Ph: 425-430-7248
Steve Lee
From: Ronald Straka
Sent: Tuesday, April 27, 2010 2:49 PM
To: clintc@vulcan.co; spencer@alpertcapital.com; danmitzel@hansellmitzel.com
Cc: Steve Lee; Vanessa Dolbee; Suzanne Dale Estey
Subject: FW: Easements vs. Dedication Lake WA Blvd.
Attachments: 100323-ESMT1 NEEDS.pdf
In the our write-up regarding easement needs that was provided to you on March 29, 2010 and during our meeting on
4/21/10 we indicated that the additional area on the Port Quendall Company property that is needed for sidewalk could
be granted to the City as an easement. After subsequent internal City discussion with Transportation, Planning and
Development Services Divisions, it was determined that the addition area needed for sidewalk really should be granted
to the City through a right-of-way dedication and not through an easement. The Hawks Landing Hotel Hearing
Examiners report required that the site plan be revised to reflect the location of the 10-ft landscape strip and 12-foot
sidewalk along the street frontage for the 3.07 acre development site. This sidewalk area would then normally be
dedicated to the City as a condition of the permit approval for the Hotel project. Below is an email message from
Vanessa Dolbee explaining the requirement for dedication, how it doesn't impact the hotel development plans or the
future development plans on the portion of the Port Quendall Company property south of the proposed Hotel project,
with respect to land use density and setback requirements. Since the City water and storm system improvement project
is moving forward prior to the Hotel project, we would like to change our request for the additional sidewalk area south
of the Hotel project site that is needed from the property owner, to be dedicated to the City as right-of-way instead of
an easement. This would allow the City to construct the sidewalk south of the Hotel project entrance. The construction
of the sidewalk and dedication of any additional right-of-way to the City would be required anyway when this portion of
the site is developed in the future. It is just happening sooner since the City is constructing frontage improvements that
would normally are constructed by any future development on the southern portion of the site frontage. The right-of-
way dedication is also in exchange for the City's approval of a public right-of-way vacation at the northern entrance.
The sidewalk area (3,282 sf) needed for the construction of the sidewalk as part of the City project (south of the Hotel
entrance driveway) can be dedicated by itself and then the sidewalk area that will be constructed by the Hotel can be
dedicated when the Hotel project permit is approved. Alternatively, the total area on the Port Quendall Company
property that is needed for sidewalk along the full frontage of the Port Quendall Company site (7.24 acre site), could be
dedicated at one time, but the responsibility for the construction of the sidewalk would still remain the same. The
combined dedication of the total area on the Port Quendall Company property needed for sidewalk would be the
recommended approach, but we would be ok with just dedicating the area that is needed for the City project sidewalk
construction south of the Hotel project entrance.
We will revise the attached figure that shows the sidewalk area to reflect that it is a dedication instead of an easement
along with our write-up regarding the land rights needs. We intend to make this change and send you a draft letter of
understanding with the updated land rights needs description and exhibit. If needed we can discuss any concern you
may have regarding the dedication of the additional area on the site needed for sidewalk. Please let me know if you
would prefer to do one dedication for the total sidewalk area needed on the Port Quendall Company property, or would
prefer to keep the dedications separate.
Thanks
Ronald J. Straka, P.E.
Utility Engineering Supervisor
City of Renton Surface Water Utility
Renton City Hall - 5th Floor
1055 South Grady Way
Renton, WA 98057-3232
Email: rstraka@rentonwa.gov
Ph: 425-430-7248
From: Vanessa Dolbee
Sent: Tuesday, April 27, 2010 10:08 AM
To: Ronald Straka; Steve Lee; Neil R. Watts
Cc: Chip Vincent
Subject: Easements vs. Dedication Lake WA Blvd.
To All
At the time of development of the HL hotel, dedication would be required for the street frontage improvements on the
northern 3.07 acre site. Dedication of the necessary right-of-way for the 10-foot planter strip and 12-foot sidewalk as
required by the hearing examiner for the approval of the HL hotel, would also be required at the time of development of
the southern portion of the Pan Abode site. Dedication of the full frontage width would not impact the potential for the
future development of the remainder of the Pan Abode site. This is due to the properties location within the COR zone.
The COR zone development standards do not stipulate specific setbacks; setbacks is determined through the site plan
review process. As such, the dedication of a strip of property that fronts Lake Washington Boulevard, would not
negatively impact future development plans for the area. Furthermore, the dedication would theoretically move the
existing property line east, bringing it closer to the existing warehouse buildings located on the site. The movement of
the property line would not impact the existing warehouse buildings in terms of conformance with development
standards. A second concern may be that the dedication would reduce the amount of land area that could be used to
calculate maximum density for the subject site. The City uses net density to determine minimum and maximum
residential density in any zone. When calculating net density, the City subtracts land area that includes, access
easements, required dedications, and critical areas. If the City was not financing the improvements for the south
portion of the Pan Abode site it would be the responsibility of the developer to construct these improvements. As such,
during the review of any residential development for the south portion of the Pan Abode site the City would subtract the
land area that would be required to be dedicated at the time of development. Therefore, the land area needed to
construct the planned improvements now, would not be included in density calculations in the future therefore
dedicating the land area now would not have an adverse impact on the maximum density of the site in the future.
Moreover, the dedication of the frontage area would be required at some point in the future in order for the subject
property to be redeveloped. As such a dedication now would provide a cleaner transition for the City in terms of
maintenance and construction of the planned frontage improvements.
Vanessa Dolbee
(Acting) Senior Planner
City of Renton
Department of Community & Economic Development
1055 South Grady Way
Renton, WA 98057
(425)430-7314
2
SEC24N— TWP29—RNG05E
/
0 40 80
1:40
EDGE OF
PROPOSED Curet
Ex. ROAD
R O.W.
i
_. EIDSTNG
WSDOT EASaW
PROPOSED TO BE
RELEASED (4116 SF)
DL ROAD
0
°
°
o°
� S106144J(3 LANDSCAPE
NORTH OF THIS LINE SHALL
BE CONSTRUCTED BY Q� oo° SIDEWALK k LANDSCAPE
HOTEL DEVELOPER (HAWKS LAM". LLC) �/ ,
0oo DEDICATION AREA NEEDED = 2291 S<
I'm BE BULT RY
�o° \ HOTEL DEVELOPER)
/ DmTNc
ff EATER NTIJIY
EASEMENT
✓J I
DL ROAD \
RO.W.
ry
' -
I
PROPOSED BIOSWALE EASEMENT AREA
t-:
;I
�6832 SF)
DEDICATION AREA PER HEARINGS
TIONS FOR 10—FT LANDSCAPING
;CONDITIONS
& 12—FT SIDEWALK (3283 SF)
i
I
VACATION AREA GRANTED
TO PROPERTY OWNER
FOR EOUIV. AREA PROVIDED BACK
TO CITY (12,100 SF)
PROPOSED WSDOT EASEMENT
_
_- --- ___
AREA (1,960 SF)
o°o°o°o°o°oN
HOTEL DEVELOPER TO CONSTRUCT
o°0000000000e
o°off
IMPROVEMENTS FOR SIDEWALK AREA
(2,291 SF)
_I
125' /
I, I
SHEET D£SCRIPDCAT
LAND. RI GH TS. NEEDS. EXHiBI T
SCALE 1 "=40
DRAM B DRAwN
Df90ED BC DESIGN
CHECKED BY.CHECKED
DATE 0514 2010
PRA.CCJ
CITY OF_ REN TON
FOR
FOR
LAKE. WASHINGTON. BL VD. N.
scc-rwP-RUG
XB NO.
roe -No.
DRAWNG NAME
DHSHEET
SHT—NO
I'
CALL 48 HOURS,!
�EFOR� YOU DIG(
�800-424-5
_ _ _- __ -- _—
_
_ —
-
_Tr_
A
I
,3752 50D SHEETS. FLLER 5SOUAAC
42-38/ SO SHEETS EE'i'E�-EASP 5 SOUARE
Matioml'B&and 42 t 8IftTS {r119P5SOUME
t2.9W 20D SHEETS M4ASEa 5 SOLMRE
d2.DC2 TLD RECYCLED WTE 5 SOUAIE
4240 ZO RECYCLED WHITE 5SOUARE
w•� e u a
S -1- %Y
—,fir ,, -Xa3zJ a*w
/GP
(v-01-L7-aS SsovL, ?
(V419(VIN9J f -17)G7 Q0scd0zd,
c Vfloo-rv)
dI'my
jc1'� H i1r 32! �- �l5c�i �vy'-u�l S
mod 03¢-aaN
O
XU M�UJ,
fir' -"' 'r . •
��♦ (,� i a , Mu3a wZe1S
ID a ��-
01
LvuatrA
l
A3
Ci'sa �N
�[V7W�Slf�
anvl �jNbl 1
�32c132 N a� is a.A I J
- - -► -
CITY OF RENTON
Lake Washington Boulevard North Storm and Water Systems
Improvement Project
Easements and Approvals Needed from the Port Quendall Company
(Vulcan)
Date: March 25, 2010
The following easements and approvals are needed from the Port Quendall Company in order to move
ahead with the City's Lake Washington Boulevard North Storm and Water System Improvement project
and get state grant funds committed via construction this year. Delays in gaining easement signatures
may result in this project being constructed next year and possibly result in increased construction costs
from contractors or even the state reducing/cancelling the grant appropriation for the storm and water
system improvement project. The City is currently expediting the design, but needs the following
easements and approvals from the property owner (Port Quendall Company) in order to continue with
the project:
1. The City of Renton requests approval from the Port Quendall Company to sign as the project
representative for Environmental Review, Shoreline Review, and JARPA Application. This is
needed because the project proposes to construct improvements in areas outside of City -owned
right-of-way on property owned by the Port Quendall Company. The improvements would be
constructed in easement areas as described below. After the Port Quendall Company approval
is granted, the City shall sign the Affidavit of Ownership on these applications and move forward
with the Lake Washington Boulevard North Storm and Water Improvement project.
2. The City has completed the 35% plan set design which includes the wet biofiltration swale
facility to treat surface water runoff from portions of Lake Washington Boulevard North. (See
easement needs exhibit attached for the location of the biofiltration Swale.) The wet
biofiltration swale and maintenance access area needed is approximately 6,832 square feet and
is located mostly within the 200-feet shorelines setback of May Creek. During the City of Renton
vacation for the access road on the north portion of the site, the City vacated 12,100 square feet
of uplands right-of-way area with a condition of release that included provisions for a City storm
water treatment facility in the southwest portion of the parcel (see City of Renton VAC file #09-
001). Note that construction of the biofiltration swale will require approximately six to seven
feet of existing asphalt in the southwest area to be removed.
3. Approximately 3,283 square feet of sidewalk easement is needed for the project to construct
the sidewalk south of the proposed Hawks' Landing south entryway (see hatched area in
attached easement exhibit). This area is required as part of the 12-feet wide sidewalk width
H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-3531 Lake Washington Blvd -Hawks'
Landing\1201 Easements\Lake_Wash_Blvd_ESMTbulletneeds_100325.docx\STLtp
conditioned by the Hearings Examiner on August 25, 2009. (See City of Renton File No. LUA 09-
060, ECF). If this easement area is not granted, then the hotel developer shall be responsible for
construction of the south sidewalk. In addition, the construction of the sidewalk and wet bio-
filtration swale access areas will impact the southwest foundation of the existing building on -
site. The demolition of at least a portion of the existing building to eliminate the potential
effects of soil foundation uplift of the building when the City project is constructed needs to be
understood by the Port Quendall Company. The whole existing building has to be demolished as
part of the Hawks' Landing Hotel project construction. Our goal is to coordinate construction of
the City's project with the Hawks' Landing Hotel project construction so that the existing
building is demolished prior to the City's project construction occurs in the area of the building.
4. The City's proposed new 24-inch WSDOT storm pipe on the north end of the site will require a
new easement to WSDOT and the City of approximately 1,960 square feet. The existing storm
pipe easement area is under the proposed new Hawks' Landing hotel building and the City will
be constructing the new 24-inch storm pipe system in a new location that will not conflict with
the proposed hotel. The City needs to be included in the easement in order to construct the
storm pipe. An appraisal of the value of the existing WSDOT storm easement area, along with
the appraisal value of the new WSDOT easement area plus the value of the City constructed new
storm pipe in the new WSDOT easement area, will be performed and compared to each other to
determine if any compensation for the release of the existing WSDOT easement is required as
part of the WSDOT release of easement real estate process. Our goal is to have the value of the
existing WSDOT easement being released equal to the value of the new WSDOT easement area
plus the new storm system value. This would eliminate the need for the property owner or the
Hawks' Landing Hotel developer to have to provide any compensation to WSDOT for the release
of the existing WSDOT easement. (See easement exhibit for existing and proposed easements.)
The existing WSDOT easement area is recorded as #7811221071 and is currently in the appraisal
process started by the City, which the City is funding from the state grant funds ($10,000).
Approval by the Port Quendall Company of the new WSDOT easement location, in order to
provide WSDOT the new storm easement and assist in vacating the existing WSDOT drainage
easement, is needed for the City to construct the WSDOT drainage connection. In addition, the
releases of the existing WSDOT storm easement will un-encumber land under the proposed
Hawks' Landing hotel building. WSDOT also needs consent from the existing the Port Quendall
Company or hotel developer on who will assume payment responsibilities for any compensation
for their release of the existing WSDOT easement, if there is any compensation required. The
need for compensation will be determined after appraisals are completed and negotiations with
WSDOT. This information is needed by the WSDOT regional headquarters prior to their
progressing with the real estate valuation process that is needed for the release of the
easement.
5. A temporary construction easement will be needed from the back of sidewalk from south of the
proposed south entry in order to construct a fill slope (2:1) behind the sidewalk and to construct
a catch basin to collect localized building and land runoff west of the existing building. A second
temporary construction easement will be needed east of the proposed bio-swale to construct
H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-3531 Lake Washington Blvd -Hawks'
Landing\1201 Ease ments\Lake_Wash_Blvd_ESMTbuIletneeds_100325.docx\STLtp
the drainage connection for existing runoff that currently is piped into the Lake Washington
Boulevard North ditch. Finally, the last temporary construction easement for staging,
constructing the WSDOT connection under the north access road and material deliveries will be
needed. The staging area can be moved to an area that will not disrupt the property owner's
operation for the site.
The City's Storm and Water System Improvement construction plans are currently at 35% design. The
City will not start the permitting process to proceed with the 60% design plans until a determination of
the WSDOT easement needs are agreed upon by the property owner. The 60% design plans are needed
by WSDOT in order for them to move forward with their easement release appraisal process. A written
assurance by the Port Quendall Company for the following items is needed:
• The Port Quendall Company owner agrees to authorize the City of Renton to submit permit
applications for Environmental Review, Shoreline Review, and JARPA Application that includes
work on the privately -owned property (bio-filtration swale, new 24" storm system in a new
WSDOT easement, and sidewalk).
• The Port Quendall Company agrees to grant the City of Renton the required easement for the
bio-filtration swale and sidewalk area to be located on private property south of the proposed
Hawks' Landings Hotel project. In addition, the Port Quendall Company will grant a temporary
construction easement for the new 24-inch storm system on the north end of the property, to
be constructed by the City and located in a new WSDOT easement. The City would provide the
Port Quendall Company the final easement documents to review and approve prior to the
advertisement of the City project for construction.
• The Port Quendall Company agrees to grant WSDOT a new easement of approximately 1,960
square feet in exchange for WSDOT releasing the existing WSDOT easement located under the
proposed Hawks' Landing Hotel building.
• The Port Quendall Company or the Hawks' Landing Hotel developer agrees to assume payment
responsibilities for any compensation required by WSDOT for the release of the existing WSDOT
easement on the property, if there is any compensation required, which will be determined
after appraisals are completed and negotiations with WSDOT.
• The Port Quendall Company agrees to grant the City temporary construction easements, the
construction of back of sidewalk slopes, and installation of storm system catch basin to provide
drainage to the private property.
H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-3531 Lake Washington Blvd -Hawks'
Landing\1201 Easements\Lake_Wash_Blvd_ESMTbulletneeds_100325.docx\STLtp
Steve Lee
From: Dan Mitzel [danmitzel@hansellmitzel.com]
Sent: Monday, April 19, 2010 12:02 PM
To: Steve Lee
Cc: spencer@alpertcapital.com; dave@dujardindev.com; Steve Van Til; Clint Chase;
dave@dujardindev.com
Subject: RE: Pan Abode - Bioswale Questions
Steve:
Thanks for making yourself available. I want to use this meeting to provide whatever
information that Clint Chase needs as part of his role in facilitating Vulcan's involvement
and cooperation. Below are the initial questions that I received from Clint Chase pertaining
to the project memo that you sent out. I responded to these questions as completely as I
could and in a number of cases there were questions that I felt would be better dealt with at
a face to face meeting. I will see you at 11:00 am Wednesday and Clint Chase has already
confirmed his availability. Please let me know what floor and room that the meeting
will take place in.
Thanks!
Dan Mitzel
From: Clint Chase
To: spencer@alpertcapital.com
To: 'Dan Mitzel'
Subject: Pan Abode - Bioswale Questions
Sent: Apr 13, 2010 11:38 AM
Steve and I met yesterday with one of our development managers to discuss the
bioswale/easements matter posed by you and the City of Renton. We don't see any serious
issues, but we had a few questions about the bioswale. We want to understand some of the
issues in more detail before we talk with the Renton people.
1. What exactly is the bioswale for? Storm water treatment?
Yes the Swale is for storm water treatment.
2. In addition to treating water from Lake Washington Blvd., would
it treat surface run-off water from the Pan Abode property and the eventual Hawk's Landing
development project? The swale will be constructed to handle all new impervious surface area
that is created as a result of the widening of Lake Washington Blvd and it will treat a minor
amount of storm water at the entrance into the Hawks Landing project. We have discuss with
the the City the possibility of expanding the swale to the north to allow for treatment oof a
significant portion of the storm water from our project and it does appear to be feasible to
expand the swale in the future as part of our storm water treatment plan. The swale will not
be treating any of the existing runoff from the Pan Abode site.
3. What exactly is it cleaning?
The swale will treat the storm water by removing sediments and other pollutants to a level of
treatment that meets the City of Renton, King County and DOE standards.
4. Once treated, where does the discharge product go and how does
it get there?
The discharge point is into the existing ditch in close proximity to the ditches confluence
with May Creek.
5. What happens if it overflows? How is that addressed?
There is a bypass structure and pipe that allows for excessive flows to bypass the swale and
go into May Creek.
A 6. How will it be finished? Landscape? Hardscape?
These details are not yet worked out and will be forthcoming as the City continues the design
of the project.
* 7. Since it's the "front door" to the project, how will it look
will it look when complete?
We will be very involved in making sure that the swale is in no way a detracting factor for
the Hawks Landing project. -7 -J —"-
8. We would like to know how the greater storm water system works
around the current property.
This question should be addressed at a face to face meeting with Steve Lee at the City of
Renton.
9. Who maintains the bioswale once completed? Will this be
addressed in the easement document?
The city of Renton will have full maintenance responsibility.
10. Is the project designed to handle storm water from surrounding
property? What landowners benefit?
The swale will not benifit any other private property owner.
,J- 11. Can you confirm the timing of construction? This summer?
At this time I believe that the City wants to build it in late summer / early fall of 2010.
A meeting with the City will provide additional information concerning timing of
construction.
12. What exactly does Renton want from us right now? In what form?
I believe that the last part of the memo from the City spells out what needs to happen. A
meeting with the City will provide additional details. I do know that the City needs to move
quickly to meet their desired schedule so the sooner we meet the better.
13. Can you confirm that the current understanding with Renton is
that it will deed to PQC the excess land at the north end of the property (approx. 12,000
S.F.) in exchange for PQC granting the easements described in the proposal Spence gave us
last week.
Conceptually the plan is to swap values and an appraisal process will determine the values of
each parcel and easement. Once these values are agreed to by all parties then the final
determination of who is writing a check to who will be determined. Hawks Landing LLC will be
paying for any amount owed by the property owner if there is any amount owed.
2
Thanks for helping us understand this in more detail.
Clint
-----Original Message -----
From: Steve Lee [mailto:Slee@Rentonwa.gov]
Sent: Monday, April 19, 2010 9:51 AM
To: Dan Mitzel
Cc: spencer@alpertcapital.com; dave@dujardindev.com; Steve Van Til; Clint Chase;
dave@dujardindev.com
Subject: RE: Pan Abode - Bioswale Questions
Hi Dan,
Yes, this Wednesday at 11am works. I will reserve a room for us and email the room...
-Steve
-----Original Message -----
From: Dan Mitzel [mailto:danmitzel@hansellmitzel.com]
Sent: Monday, April 19, 2010 9:30 AM
To: Steve Lee
Cc: spencer@alpertcapital.com; dave@dujardindev.com; Steve Van Til; Clint Chase;
dave@dujardindev.com
Subject: RE: Pan Abode - Bioswale Questions
Steve:
Are you available to meet this Wednesday at 11:00 with myself and Clint Chase who is
representing Vulcan in regards to the Lake Washington Blvd.
project? We would like to meet at city Hall if at all possible.
Dan
-----Original Message -----
From: Clint Chase [mailto:ClintC@vulcan.com]
Sent: Monday, April 19, 2010 9:33 AM
To: Dan Mitzel
Cc: Steve Lee; spencer@alpertcapital.com; dave@dujardindev.com; Steve Van Til
Subject: RE: Pan Abode - Bioswale Questions
I can make Wednesday at 11:00 in Renton.
-----Original Message -----
From: Dan Mitzel [mailto:danmitzel@hansellmitzel.com]
Sent: Monday, April 19, 2010 9:18 AM
To: Clint Chase
Cc: Steve Lee; spencer@alpertcapital.com; dave@dujardindev.com
Subject: RE: Pan Abode - Bioswale Questions
Clint:
3
I would like to set up a meeting for this Wednesday at 11:00 am at the City of Renton to
further discuss the requests being made by the City of Renton in regards to the Hawks Landing
project. I wanted to check your availability before I contact Steve Lee at the City. Does
11:00 work for you if I can get Steve lined up?
Dan
-----Original Message -----
From: Clint Chase [mailto:ClintC@vulcan.com]
Sent: Tuesday, April 13, 2010 11:38 AM
To: 'spencer@alpertcapital.com'; Dan Mitzel
Subject: Pan Abode - Bioswale Questions
Steve and I met yesterday with one of our development managers to discuss the
bioswale/easements matter posed by you and the City of Renton. We don't see any serious
issues, but we had a few questions about the bioswale. We want to understand some of the
issues in more detail before we talk with the Renton people.
1. What exactly is the bioswale for? Storm water treatment?
2. In addition to treating water from Lake Washington Blvd., would
it treat surface run-off water from the Pan Abode property and the eventual Hawk's Landing
development project?
3. What exactly is it cleaning?
4. Once treated, where does the discharge product go and how does
it get there?
5. What happens if it overflows? How is that addressed?
6. How will it be finished? Landscape? Hardscape?
7. Since it's the "front door" to the project, how will it look
will it look when complete?
8. We would like to know how the greater stormwater system works
around the current property.
9. Who maintains the bioswale once completed? Will this be
addressed in the easement document?
10. Is the project designed to handle stormwater from surrounding
property? What landowners benefit?
11. Can you confirm the timing of construction? This summer?
12. What exactly does Renton want from us right now? In what form?
13. Can you confirm that the current understanding with Renton is
that it will deed to PQC the excess land at the north end of the property (approx. 12,000 sf)
in exchange for PQC granting the easements described in the proposal Spence gave us last
week.
Thanks for helping us understand this in more detail.
Clint
4
t �..
'S SyrY--v I 44_
'7 Ile v CITY OF RENTON
off' C�
Lake Washington Boulevard North Storm and Water Systems
Improvement Project
Easements and Approvals Needed from the Port Quendall Company
(Vulcan)
Date: March 25, 2010
The following easements and approvals are needed from the Port Quendall Company in order to move
ahead with the City's Lake Washington Boulevard North Storm and Water System Improvement project
and get state grant funds committed via construction this year. Delays in gaining easement signatures
may result in this project being constructed next year and possibly result in increased construction costs
from contractors or even the state reducing/cancelling the grant appropriation for the storm and water
system improvement project. The City is currently expediting the design, but needs the following
easements and approvals from the property owner (Port Quendall Company) in order to continue with
the project:
1. The City of Renton requests approval from the Port Quendall Company to sign as the project
representative for Environmental Review, Shoreline Review, and JARPA Application. This is
needed because the project proposes to construct improvements in areas outside of City -owned
right-of-way on property owned by the Port Quendall Company. The improvements would be
constructed in easement areas as described below. After the Port Quendall Company approval
is granted, the City shall sign the Affidavit of Ownership on these applications and move forward
with the Lake Washington Boulevard North Storm and Water Improvement project.
2. The City has completed the 35% plan set design which includes the wet biofiltration swale
facility to treat surface water runoff from portions of Lake Washington Boulevard North. (See
easement needs exhibit attached for the location of the biofiltration swale.) The wet
biofiltration swale and maintenance access area needed is approximately 6,832 square feet and
is located mostly within the 200-feet shorelines setback of May Creek. During the City of Renton
vacation for the access road on the north portion of the site, the City vacated 12,100 square feet
of uplands right-of-way area with a condition of release that included provisions for a City storm
water treatment facility in the southwest portion of the parcel (see City of Renton VAC file #09-
001). Note that construction of the biofiltration swale will require approximately six to seven
feet of existing asphalt in the southwest area to be removed.
3. Approximately 3,283 square feet of sidewalk easement is needed for the project to construct
the sidewalk south of the proposed Hawks' Landing south entryway (see hatched area in
attached easement exhibit). This area is required as part of the 12-feet wide sidewalk width
H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-3531 Lake Washington Blvd -Hawks'
Landing\1201 Easements\Lake_Wash_Blvd_ESMTbulletneeds_100325.docx\STLtp
conditioned by the Hearings Examiner on August 25, 2009. (See City of Renton File No. LUA 09-
060, ECF). If this easement area is not granted, then the hotel developer shall be responsible for
construction of the south sidewalk. In addition, the construction of the sidewalk and wet bio-
filtration swale access areas will impact the southwest foundation of the existing building on -
site. The demolition of at least a portion of the existing building to eliminate the potential
effects of soil foundation uplift of the building when the City project is constructed needs to be
understood by the Port Quendall Company. The whole existing building has to be demolished as
part of the Hawks' Landing Hotel project construction. Our goal is to coordinate construction of
the City's project with the Hawks' Landing Hotel project construction so that the existing
building is demolished prior to the City's project construction occurs in the area of the building.
4. The City's proposed new 24-inch WSDOT storm pipe on the north end of the site will require a
new easement to WSDOT and the City of approximately 1,960 square feet. The existing storm
pipe easement area is under the proposed new Hawks' Landing hotel building and the City will
be constructing the new 24-inch storm pipe system in a new location that will not conflict with
the proposed hotel. The City needs to be included in the easement in order to construct the
storm pipe. An appraisal of the value of the existing WSDOT storm easement area, along with
the appraisal value of the new WSDOT easement area plus the value of the City constructed new
storm pipe in the new WSDOT easement area, will be performed and compared to each other to
determine if any compensation for the release of the existing WSDOT easement is required as
part of the WSDOT release of easement real estate process. Our goal is to have the value of the
existing WSDOT easement being released equal to the value of the new WSDOT easement area
plus the new storm system value. This would eliminate the need for the property owner or the
Hawks' Landing Hotel developer to have to provide any compensation to WSDOT for the release
of the existing WSDOT easement. (See easement exhibit for existing and proposed easements.)
The existing WSDOT easement area is recorded as #7811221071 and is currently in the appraisal
process started by the City, which the City is funding from the state grant funds ($10,000).
Approval by the Port Quendall Company of the new WSDOT easement location, in order to
provide WSDOT the new storm easement and assist in vacating the existing WSDOT drainage
easement, is needed for the City to construct the WSDOT drainage connection. In addition, the
releases of the existing WSDOT storm easement will un-encumber land under the proposed
Hawks' Landing hotel building. WSDOT also needs consent from the existing the Port Quendall
Company or hotel developer on who will assume payment responsibilities for any compensation
for their release of the existing WSDOT easement, if there is any compensation required. The
need for compensation will be determined after appraisals are completed and negotiations with
WSDOT. This information is needed by the WSDOT regional headquarters prior to their
progressing with the real estate valuation process that is needed for the release of the
easement.
5. A temporary construction easement will be needed from the back of sidewalk from south of the
proposed south entry in order to construct a fill slope (2:1) behind the sidewalk and to construct
a catch basin to collect localized building and land runoff west of the existing building. A second
temporary construction easement will be needed east of the proposed bio-swale to construct
H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-3531 Lake Washington Blvd -Hawks'
Landing\1201 Easements\Lake_Wash_Blvd_ESMTbulletneeds_100325.docx\STLtp
the drainage connection for existing runoff that currently is piped into the Lake Washington
Boulevard North ditch. Finally, the last temporary construction easement for staging,
constructing the WSDOT connection under the north access road and material deliveries will be
needed. The staging area can be moved to an area that will not disrupt the property owner's
operation for the site.
The City's Storm and Water System Improvement construction plans are currently at 35% design. The
City will not start the permitting process to proceed with the 60% design plans until a determination of
the WSDOT easement needs are agreed upon by the property owner. The 60% design plans are needed
by WSDOT in order for them to move forward with their easement release appraisal process. A written
assurance by the Port Quendall Company for the following items is needed:
• The Port Quendall Company owner agrees to authorize the City of Renton to submit permit
applications for Environmental Review, Shoreline Review, and JARPA Application that includes
work on the privately -owned property (bio-filtration swale, new 24" storm system in a new
WSDOT easement, and sidewalk).
• The Port Quendall Company agrees to grant the City of Renton the required easement for the
bio-filtration swale and sidewalk area to be located on private property south of the proposed
Hawks' Landings Hotel project. In addition, the Port Quendall Company will grant a temporary
construction easement for the new 24-inch storm system on the north end of the property, to
be constructed by the City and located in a new WSDOT easement. The City would provide the
Port Quendall Company the final easement documents to review and approve prior to the
advertisement of the City project for construction.
• The Port Quendall Company agrees to grant WSDOT a new easement of approximately 1,960
square feet in exchange for WSDOT releasing the existing WSDOT easement located under the
proposed Hawks' Landing Hotel building.
• The Port Quendall Company or the Hawks' Landing Hotel developer agrees to assume payment
responsibilities for any compensation required by WSDOT for the release of the existing WSDOT
easement on the property, if there is any compensation required, which will be determined
after appraisals are completed and negotiations with WSDOT.
• The Port Quendall Company agrees to grant the City temporary construction easements, the
construction of back of sidewalk slopes, and installation of storm system catch basin to provide
drainage to the private property.
H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-3531 Lake Washington Blvd -Hawks'
Landing\1201 Ease ments\Lake_Wash_Blvd_ESMTbuI letneeds_100325.docx\STLtp
CITY OF RENTON
Lake Washington Boulevard North Storm and Water Systems
Improvement Project
Easements and Approvals Needed from the Port Quendall Company
(Vulcan)
Date: March 25, 2010
The following easements and approvals are needed from the Port Quendall Company in order to move
ahead with the City's Lake Washington Boulevard North Storm and Water System Improvement project
and get state grant funds committed via construction this year. Delays in gaining easement signatures
may result in this project being constructed next year and possibly result in increased construction costs
from contractors or even the state reducing/cancelling the grant appropriation for the storm and water
system improvement project. The City is currently expediting the design, but needs the following
easements and approvals from the property owner (Port Quendall Company) in order to continue with
the project:
1. The City of Renton requests approval from the Port Quendall Company to sign as the project
representative for Environmental Review, Shoreline Review, and JARPA Application. This is
needed because the project proposes to construct improvements in areas outside of City -owned
right-of-way on property owned by the Port Quendall Company. The improvements would be
constructed in easement areas as described below. After the Port Quendall Company approval
is granted, the City shall sign the Affidavit of Ownership on these applications and move forward
with the Lake Washington Boulevard North Storm and Water Improvement project.
2. The City has completed the 35% plan set design which includes the wet biofiltration Swale
facility to treat surface water runoff from portions of Lake Washington Boulevard North. (See
easement needs exhibit attached for the location of the biofiltration Swale.) The wet
biofiltration Swale and maintenance access area needed is approximately 6,832 square feet and
is located mostly within the 200-feet shorelines setback of May Creek. During the City of Renton
vacation for the access road on the north portion of the site, the City vacated 12,100 square feet
of uplands right-of-way area with a condition of release that included provisions for a City storm
water treatment facility in the southwest portion of the parcel (see City of Renton VAC file #09-
001). Note that construction of the biofiltration Swale will require approximately six to seven
feet of existing asphalt in the southwest area to be removed.
3. Approximately 3,283 square feet of sidewalk easement is needed for the project to construct
the sidewalk south of the proposed Hawks' Landing south entryway (see hatched area in
attached easement exhibit). This area is required as part of the 12-feet wide sidewalk width
H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-3531 Lake Washington Blvd -Hawks'
Landing\1201 Ease ments\Lake_Wash_Blvd_ESMTbulletneeds_100325.docx\STLtp
conditioned by the Hearings Examiner on August 25, 2009. (See City of Renton File No. LUA 09-
060, ECF). If this easement area is not granted, then the hotel developer shall be responsible for
construction of the south sidewalk. In addition, the construction of the sidewalk and wet bio-
filtration swale access areas will impact the southwest foundation of the existing building on -
site. The demolition of at least a portion of the existing building to eliminate the potential
effects of soil foundation uplift of the building when the City project is constructed needs to be
understood by the Port Quendall Company. The whole existing building has to be demolished as
part of the Hawks' Landing Hotel project construction. Our goal is to coordinate construction of
the City's project with the Hawks' Landing Hotel project construction so that the existing
building is demolished prior to the City's project construction occurs in the area of the building.
4. The City's proposed new 24-inch WSDOT storm pipe on the north end of the site will require a
new easement to WSDOT and the City of approximately 1,960 square feet. The existing storm
pipe easement area is under the proposed new Hawks' Landing hotel building and the City will
be constructing the new 24-inch storm pipe system in a new location that will not conflict with
the proposed hotel. The City needs to be included in the easement in order to construct the
storm pipe. An appraisal of the value of the existing WSDOT storm easement area, along with
the appraisal value of the new WSDOT easement area plus the value of the City constructed new
storm pipe in the new WSDOT easement area, will be performed and compared to each other to
determine if any compensation for the release of the existing WSDOT easement is required as
part of the WSDOT release of easement real estate process. Our goal is to have the value of the
existing WSDOT easement being released equal to the value of the new WSDOT easement area
plus the new storm system value. This would eliminate the need for the property owner or the
Hawks' Landing Hotel developer to have to provide any compensation to WSDOT for the release
of the existing WSDOT easement. (See easement exhibit for existing and proposed easements.)
The existing WSDOT easement area is recorded as #7811221071 and is currently in the appraisal
process started by the City, which the City is funding from the state grant funds ($10,000).
Approval by the Port Quendall Company of the new WSDOT easement location, in order to
provide WSDOT the new storm easement and assist in vacating the existing WSDOT drainage
easement, is needed for the City to construct the WSDOT drainage connection. In addition, the
releases of the existing WSDOT storm easement will un-encumber land under the proposed
Hawks' Landing hotel building. WSDOT also needs consent from the existing the Port Quendall
Company or hotel developer on who will assume payment responsibilities for any compensation
for their release of the existing WSDOT easement, if there is any compensation required. The
need for compensation will be determined after appraisals are completed and negotiations with
WSDOT. This information is needed by the WSDOT regional headquarters prior to their
progressing with the real estate valuation process that is needed for the release of the
easement.
5. A temporary construction easement will be needed from the back of sidewalk from south of the
proposed south entry in order to construct a fill slope (2:1) behind the sidewalk and to construct
a catch basin to collect localized building and land runoff west of the existing building. A second
temporary construction easement will be needed east of the proposed bio-swale to construct
H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-3531 Lake Washington Blvd -Hawks'
Landing\1201 Easements\Lake_Wash_Blvd_ESMTbulletneeds_100325.docx\STLtp
the drainage connection for existing runoff that currently is piped into the Lake Washington
Boulevard North ditch. Finally, the last temporary construction easement for staging,
constructing the WSDOT connection under the north access road and material deliveries will be
needed. The staging area can be moved to an area that will not disrupt the property owners
operation for the site.
The City's Storm and Water System Improvement construction plans are currently at 35% design. The
City will not start the permitting process to proceed with the 60% design plans until a determination of
the WSDOT easement needs are agreed upon by the property owner. The 60% design plans are needed
by WSDOT in order for them to move forward with their easement release appraisal process. A written
assurance by the Port Quendall Company for the following items is needed:
• The Port Quendall Company owner agrees to authorize the City of Renton to submit permit
applications for Environmental Review, Shoreline Review, and JARPA Application that includes
work on the privately -owned property (bio-filtration Swale, new 24" storm system in a new
WSDOT easement, and sidewalk).
• The Port Quendall Company agrees to grant the City of Renton the required easement for the
bio-filtration swale and sidewalk area to be located on private property south of the proposed
Hawks' Landings Hotel project. In addition, the Port Quendall Company will grant a temporary
construction easement for the new 24-inch storm system on the north end of the property, to
be constructed by the City and located in a new WSDOT easement. The City would provide the
Port Quendall Company the final easement documents to review and approve prior to the
advertisement of the City project for construction.
• The Port Quendall Company agrees to grant WSDOT a new easement of approximately 1,960
square feet in exchange for WSDOT releasing the existing WSDOT easement located under the
proposed Hawks' Landing Hotel building.
• The Port Quendall Company or the Hawks' Landing Hotel developer agrees to assume payment
responsibilities for any compensation required by WSDOT for the release of the existing WSDOT
easement on the property, if there is any compensation required, which will be determined
after appraisals are completed and negotiations with WSDOT.
• The Port Quendall Company agrees to grant the City temporary construction easements, the
construction of back of sidewalk slopes, and installation of storm system catch basin to provide
drainage to the private property.
H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-3531 Lake Washington Blvd -Hawks'
Landing\1201 Ease ments\Lake_Wash_Blvd_ESMTbuIletneeds_100325.docx\STLtp
CITY OF RENTON
Lake Washington Boulevard North Storm and Water Systems
Improvement Project
Easements and Approvals Needed from the Port Quendall Company
(Vulcan)
Date: March 25, 2010
The following easements and approvals are needed from the Port Quendall Company in order to move
ahead with the City's Lake Washington Boulevard North Storm and Water System Improvement project
and get state grant funds committed via construction this year. Delays in gaining easement signatures
may result in this project being constructed next year and possibly result in increased construction costs
from contractors or even the state reducing/cancelling the grant appropriation for the storm and water
system improvement project. The City is currently expediting the design, but needs the following
easements and approvals from the property owner (Port Quendall Company) in order to continue with
the project:
1. The City of Renton requests approval from the Port Quendall Company to sign as the project
representative for Environmental Review, Shoreline Review, and JARPA Application. This is
needed because the project proposes to construct improvements in areas outside of City -owned
right-of-way on property owned by the Port Quendall Company. The improvements would be
constructed in easement areas as described below. After the Port Quendall Company approval
is granted, the City shall sign the Affidavit of Ownership on these applications and move forward
with the Lake Washington Boulevard North Storm and Water Improvement project.
2. The City has completed the 35% plan set design which includes the wet biofiltration swale
facility to treat surface water runoff from portions of Lake Washington Boulevard North. (See
easement needs exhibit attached for the location of the biofiltration swale.) The wet
biofiltration swale and maintenance access area needed is approximately 6,832 square feet and
is located mostly within the 200-feet shorelines setback of May Creek. During the City of Renton
vacation for the access road on the north portion of the site, the City vacated 12,100 square feet
of uplands right-of-way area with a condition of release that included provisions for a City storm
water treatment facility in the southwest portion of the parcel (see City of Renton VAC file #09-
001). Note that construction of the biofiltration Swale will require approximately six to seven
feet of existing asphalt in the southwest area to be removed.
3. Approximately 3,283 square feet of sidewalk easement is needed for the project to construct
the sidewalk south of the proposed Hawks' Landing south entryway (see hatched area in
attached easement exhibit). This area is required as part of the 12-feet wide sidewalk width
H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-3531 Lake Washington Blvd -Hawks'
Landing\1201 Ease ments\Lake_Wash_Blvd_ESMTbuIletneed s_100325.docx\STLtp
conditioned by the Hearings Examiner on August 25, 2009. (See City of Renton File No. LUA 09-
060, ECF). If this easement area is not granted, then the hotel developer shall be responsible for
construction of the south sidewalk. In addition, the construction of the sidewalk and wet bio-
filtration swale access areas will impact the southwest foundation of the existing building on -
site. The demolition of at least a portion of the existing building to eliminate the potential
effects of soil foundation uplift of the building when the City project is constructed needs to be
understood by the Port Quendall Company. The whole existing building has to be demolished as
part of the Hawks' Landing Hotel project construction. Our goal is to coordinate construction of
the City's project with the Hawks' Landing Hotel project construction so that the existing
building is demolished prior to the City's project construction occurs in the area of the building.
4. The City's proposed new 24-inch WSDOT storm pipe on the north end of the site will require a
new easement to WSDOT and the City of approximately 1,960 square feet. The existing storm
pipe easement area is under the proposed new Hawks' Landing hotel building and the City will
be constructing the new 24-inch storm pipe system in a new location that will not conflict with
the proposed hotel. The City needs to be included in the easement in order to construct the
storm pipe. An appraisal of the value of the existing WSDOT storm easement area, along with
the appraisal value of the new WSDOT easement area plus the value of the City constructed new
storm pipe in the new WSDOT easement area, will be performed and compared to each other to
determine if any compensation for the release of the existing WSDOT easement is required as
part of the WSDOT release of easement real estate process. Our goal is to have the value of the
existing WSDOT easement being released equal to the value of the new WSDOT easement area
plus the new storm system value. This would eliminate the need for the property owner or the
Hawks' Landing Hotel developer to have to provide any compensation to WSDOT for the release
of the existing WSDOT easement. (See easement exhibit for existing and proposed easements.)
The existing WSDOT easement area is recorded as #7811221071 and is currently in the appraisal
process started by the City, which the City is funding from the state grant funds ($10,000).
Approval by the Port Quendall Company of the new WSDOT easement location, in order to
provide WSDOT the new storm easement and assist in vacating the existing WSDOT drainage
easement, is needed for the City to construct the WSDOT drainage connection. In addition, the
releases of the existing WSDOT storm easement will un-encumber land under the proposed
Hawks' Landing hotel building. WSDOT also needs consent from the existing the Port Quendall
Company or hotel developer on who will assume payment responsibilities for any compensation
for their release of the existing WSDOT easement, if there is any compensation required. The
need for compensation will be determined after appraisals are completed and negotiations with
WSDOT. This information is needed by the WSDOT regional headquarters prior to their
progressing with the real estate valuation process that is needed for the release of the
easement.
S. A temporary construction easement will be needed from the back of sidewalk from south of the
proposed south entry in order to construct a fill slope (2:1) behind the sidewalk and to construct
a catch basin to collect localized building and land runoff west of the existing building. A second
temporary construction easement will be needed east of the proposed bio-swale to construct
H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-3531 Lake Washington Blvd -Hawks'
Landing\1201 Easements\Lake_Wash_Blvd_ESMTbulletneeds_100325.docx\STLtp
the drainage connection for existing runoff that currently is piped into the Lake Washington
Boulevard North ditch. Finally, the last temporary construction easement for staging,
constructing the WSDOT connection under the north access road and material deliveries will be
needed. The staging area can be moved to an area that will not disrupt the property owner's
operation for the site.
The City's Storm and Water System Improvement construction plans are currently at 35% design. The
City will not start the permitting process to proceed with the 60% design plans until a determination of
the WSDOT easement needs are agreed upon by the property owner. The 60% design plans are needed
by WSDOT in order for them to move forward with their easement release appraisal process. A written
assurance by the Port Quendall Company for the following items is needed:
• The Port Quendall Company owner agrees to authorize the City of Renton to submit permit
applications for Environmental Review, Shoreline Review, and JARPA Application that includes
work on the privately -owned property (bio-filtration swale, new 24" storm system in a new
WSDOT easement, and sidewalk).
• The Port Quendall Company agrees to grant the City of Renton the required easement for the
bio-filtration swale and sidewalk area to be located on private property south of the proposed
Hawks' Landings Hotel project. In addition, the Port Quendall Company will grant a temporary
construction easement for the new 24-inch storm system on the north end of the property, to
be constructed by the City and located in a new WSDOT easement. The City would provide the
Port Quendall Company the final easement documents to review and approve prior to the
advertisement of the City project for construction.
• The Port Quendall Company agrees to grant WSDOT a new easement of approximately 1,960
square feet in exchange for WSDOT releasing the existing WSDOT easement located under the
proposed Hawks' Landing Hotel building.
• The Port Quendall Company or the Hawks' Landing Hotel developer agrees to assume payment
responsibilities for any compensation required by WSDOT for the release of the existing WSDOT
easement on the property, if there is any compensation required, which will be determined
after appraisals are completed and negotiations with WSDOT.
• The Port Quendall Company agrees to grant the City temporary construction easements, the
construction of back of sidewalk slopes, and installation of storm system catch basin to provide
drainage to the private property.
H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-3531 Lake Washington Blvd -Hawks'
Landing\1201 Ease ments\Lake_Wash_Blvd_ESMTbuiletneeds_100325.docx\STLtp
CITY OF RENTON
Lake Washington Boulevard North Storm and Water Systems
Improvement Project
Easements and Approvals Needed from the Port Quendall Company
(Vulcan)
Date: March 25, 2010
The following easements and approvals are needed from the Port Quendall Company in order to move
ahead with the City's Lake Washington Boulevard North Storm and Water System Improvement project
and get state grant funds committed via construction this year. Delays in gaining easement signatures
may result in this project being constructed next year and possibly result in increased construction costs
from contractors or even the state reducing/cancelling the grant appropriation for the storm and water
system improvement project. The City is currently expediting the design, but needs the following
easements and approvals from the property owner (Port Quendall Company) in order to continue with
the project:
1. The City of Renton requests approval from the Port Quendall Company to sign as the project
representative for Environmental Review, Shoreline Review, and JARPA Application. This is
needed because the project proposes to construct improvements in areas outside of City -owned
right-of-way on property owned by the Port Quendall Company. The improvements would be
constructed in easement areas as described below. After the Port Quendall Company approval
is granted, the City shall sign the Affidavit of Ownership on these applications and move forward
with the Lake Washington Boulevard North Storm and Water Improvement project.
2. The City has completed the 35% plan set design which includes the wet biofiltration Swale
facility to treat surface water runoff from portions of Lake Washington Boulevard North. (See
easement needs exhibit attached for the location of the biofiltration swale.) The wet
biofiltration swale and maintenance access area needed is approximately 6,832 square feet and
is located mostly within the 200-feet shorelines setback of May Creek. During the City of Renton
vacation for the access road on the north portion of the site, the City vacated 12,100 square feet
of uplands right-of-way area with a condition of release that included provisions for a City storm
water treatment facility in the southwest portion of the parcel (see City of Renton VAC file #09-
001). Note that construction of the biofiltration swale will require approximately six to seven
feet of existing asphalt in the southwest area to be removed.
3. Approximately 3,283 square feet of sidewalk easement is needed for the project to construct
the sidewalk south of the proposed Hawks' Landing south entryway (see hatched area in
attached easement exhibit). This area is required as part of the 12-feet wide sidewalk width
H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-3531 Lake Washington Blvd -Hawks'
Landing\1201 Easements\Lake_Wash_Blvd_ESMTbulletneeds_100325.docx\STLtp
conditioned by the Hearings Examiner on August 25, 2009. (See City of Renton File No. LUA 09-
060, ECF). If this easement area is not granted, then the hotel developer shall be responsible for
construction of the south sidewalk. In addition, the construction of the sidewalk and wet bio-
filtration swale access areas will impact the southwest foundation of the existing building on -
site. The demolition of at least a portion of the existing building to eliminate the potential
effects of soil foundation uplift of the building when the City project is constructed needs to be
understood by the Port Quendall Company. The whole existing building has to be demolished as
part of the Hawks' Landing Hotel project construction. Our goal is to coordinate construction of
the City's project with the Hawks' Landing Hotel project construction so that the existing
building is demolished prior to the City's project construction occurs in the area of the building.
4. The City's proposed new 24-inch WSDOT storm pipe on the north end of the site will require a
new easement to WSDOT and the City of approximately 1,960 square feet. The existing storm
pipe easement area is under the proposed new Hawks' Landing hotel building and the City will
be constructing the new 24-inch storm pipe system in a new location that will not conflict with
the proposed hotel. The City needs to be included in the easement in order to construct the
storm pipe. An appraisal of the value of the existing WSDOT storm easement area, along with
the appraisal value of the new WSDOT easement area plus the value of the City constructed new
storm pipe in the new WSDOT easement area, will be performed and compared to each other to
determine if any compensation for the release of the existing WSDOT easement is required as
part of the WSDOT release of easement real estate process. Our goal is to have the value of the
existing WSDOT easement being released equal to the value of the new WSDOT easement area
plus the new storm system value. This would eliminate the need for the property owner or the
Hawks' Landing Hotel developer to have to provide any compensation to WSDOT for the release
of the existing WSDOT easement. (See easement exhibit for existing and proposed easements.)
The existing WSDOT easement area is recorded as #7811221071 and is currently in the appraisal
process started by the City, which the City is funding from the state grant funds ($10,000).
Approval by the Port Quendall Company of the new WSDOT easement location, in order to
provide WSDOT the new storm easement and assist in vacating the existing WSDOT drainage
easement, is needed for the City to construct the WSDOT drainage connection. In addition, the
releases of the existing WSDOT storm easement will un-encumber land under the proposed
Hawks' Landing hotel building. WSDOT also needs consent from the existing the Port Quendall
Company or hotel developer on who will assume payment responsibilities for any compensation
for their release of the existing WSDOT easement, if there is any compensation required. The
need for compensation will be determined after appraisals are completed and negotiations with
WSDOT. This information is needed by the WSDOT regional headquarters prior to their
progressing with the real estate valuation process that is needed for the release of the
easement.
5. A temporary construction easement will be needed from the back of sidewalk from south of the
proposed south entry in order to construct a fill slope (2:1) behind the sidewalk and to construct
a catch basin to collect localized building and land runoff west of the existing building. A second
temporary construction easement will be needed east of the proposed bio-swale to construct
H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-3531 Lake Washington Blvd -Hawks'
Landing\1201 Ease ments\Lake_Wash_Blvd_ESMTbuII etneeds_100325.docx\STLtp
the drainage connection for existing runoff that currently is piped into the Lake Washington
Boulevard North ditch. Finally, the last temporary construction easement for staging,
constructing the WSDOT connection under the north access road and material deliveries will be
needed. The staging area can be moved to an area that will not disrupt the property owner's
operation for the site.
The City's Storm and Water System Improvement construction plans are currently at 35% design. The
City will not start the permitting process to proceed with the 60% design plans until a determination of
the WSDOT easement needs are agreed upon by the property owner. The 60% design plans are needed
by WSDOT in order for them to move forward with their easement release appraisal process. A written
assurance by the Port Quendall Company for the following items is needed:
• The Port Quendall Company owner agrees to authorize the City of Renton to submit permit
applications for Environmental Review, Shoreline Review, and DARPA Application that includes
work on the privately -owned property (bio-filtration Swale, new 24" storm system in a new
WSDOT easement, and sidewalk).
• The Port Quendall Company agrees to grant the City of Renton the required easement for the
bio-filtration swale and sidewalk area to be located on private property south of the proposed
Hawks' Landings Hotel project. In addition, the Port Quendall Company will grant a temporary
construction easement for the new 24-inch storm system on the north end of the property, to
be constructed by the City and located in a new WSDOT easement. The City would provide the
Port Quendall Company the final easement documents to review and approve prior to the
advertisement of the City project for construction.
• The Port Quendall Company agrees to grant WSDOT a new easement of approximately 1,960
square feet in exchange for WSDOT releasing the existing WSDOT easement located under the
proposed Hawks' Landing Hotel building.
• The Port Quendall Company or the Hawks' Landing Hotel developer agrees to assume payment
responsibilities for any compensation required by WSDOT for the release of the existing WSDOT
easement on the property, if there is any compensation required, which will be determined
after appraisals are completed and negotiations with WSDOT.
• The Port Quendall Company agrees to grant the City temporary construction easements, the
construction of back of sidewalk slopes, and installation of storm system catch basin to provide
drainage to the private property.
H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-3531 Lake Washington Blvd -Hawks'
Landing\1201 Ease ments\Lake_Wash_Blvd_ESMTbuIletneeds_100325.docx\STLtp
CITY OF RENTON
Lake Washington Boulevard North Storm and Water Systems
Improvement Project
Easements and Approvals Needed from the Port Quendall Company
(Vulcan)
Date: March 25, 2010
The following easements and approvals are needed from the Port Quendall Company in order to move
ahead with the City's Lake Washington Boulevard North Storm and Water System Improvement project
and get state grant funds committed via construction this year. Delays in gaining easement signatures
may result in this project being constructed next year and possibly result in increased construction costs
from contractors or even the state reducing/cancelling the grant appropriation for the storm and water
system improvement project. The City is currently expediting the design, but needs the following
easements and approvals from the property owner (Port Quendall Company) in order to continue with
the project:
1. The City of Renton requests approval from the Port Quendall Company to sign as the project
representative for Environmental Review, Shoreline Review, and JARPA Application. This is
needed because the project proposes to construct improvements in areas outside of City -owned
right-of-way on property owned by the Port Quendall Company. The improvements would be
constructed in easement areas as described below. After the Port Quendall Company approval
is granted, the City shall sign the Affidavit of Ownership on these applications and move forward
with the Lake Washington Boulevard North Storm and Water Improvement project.
2. The City has completed the 35% plan set design which includes the wet biofiltration swale
facility to treat surface water runoff from portions of Lake Washington Boulevard North. (See
easement needs exhibit attached for the location of the biofiltration Swale.) The wet
biofiltration swale and maintenance access area needed is approximately 6,832 square feet and
is located mostly within the 200-feet shorelines setback of May Creek. During the City of Renton
vacation for the access road on the north portion of the site, the City vacated 12,100 square feet
of uplands right-of-way area with a condition of release that included provisions for a City storm
water treatment facility in the southwest portion of the parcel (see City of Renton VAC file #09-
001). Note that construction of the biofiltration Swale will require approximately six to seven
feet of existing asphalt in the southwest area to be removed.
3. Approximately 3,283 square feet of sidewalk easement is needed for the project to construct
the sidewalk south of the proposed Hawks' Landing south entryway (see hatched area in
attached easement exhibit). This area is required as part of the 12-feet wide sidewalk width
H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-3531 Lake Washington Blvd -Hawks'
Landing\1201 Easements\Lake_Wash_Blvd_ESMTbulletneeds_100325.docx\STLtp
conditioned by the Hearings Examiner on August 25, 2009. (See City of Renton File No. LUA 09-
060, ECF). If this easement area is not granted, then the hotel developer shall be responsible for
construction of the south sidewalk. In addition, the construction of the sidewalk and wet bio-
filtration swale access areas will impact the southwest foundation of the existing building on -
site. The demolition of at least a portion of the existing building to eliminate the potential
effects of soil foundation uplift of the building when the City project is constructed needs to be
understood by the Port Quendall Company. The whole existing building has to be demolished as
part of the Hawks' Landing Hotel project construction. Our goal is to coordinate construction of
the City's project with the Hawks' Landing Hotel project construction so that the existing
building is demolished prior to the City's project construction occurs in the area of the building.
4. The City's proposed new 24-inch WSDOT storm pipe on the north end of the site will require a
new easement to WSDOT and the City of approximately 1,960 square feet. The existing storm
pipe easement area is under the proposed new Hawks' Landing hotel building and the City will
be constructing the new 24-inch storm pipe system in a new location that will not conflict with
the proposed hotel. The City needs to be included in the easement in order to construct the
storm pipe. An appraisal of the value of the existing WSDOT storm easement area, along with
the appraisal value of the new WSDOT easement area plus the value of the City constructed new
storm pipe in the new WSDOT easement area, will be performed and compared to each other to
determine if any compensation for the release of the existing WSDOT easement is required as
part of the WSDOT release of easement real estate process. Our goal is to have the value of the
existing WSDOT easement being released equal to the value of the new WSDOT easement area
plus the new storm system value. This would eliminate the need for the property owner or the
Hawks' Landing Hotel developer to have to provide any compensation to WSDOT for the release
of the existing WSDOT easement. (See easement exhibit for existing and proposed easements.)
The existing WSDOT easement area is recorded as #7811221071 and is currently in the appraisal
process started by the City, which the City is funding from the state grant funds ($10,000).
Approval by the Port Quendall Company of the new WSDOT easement location, in order to
provide WSDOT the new storm easement and assist in vacating the existing WSDOT drainage
easement, is needed for the City to construct the WSDOT drainage connection. In addition, the
releases of the existing WSDOT storm easement will un-encumber land under the proposed
Hawks' Landing hotel building. WSDOT also needs consent from the existing the Port Quendall
Company or hotel developer on who will assume payment responsibilities for any compensation
for their release of the existing WSDOT easement, if there is any compensation required. The
need for compensation will be determined after appraisals are completed and negotiations with
WSDOT. This information is needed by the WSDOT regional headquarters prior to their
progressing with the real estate valuation process that is needed for the release of the
easement.
5. A temporary construction easement will be needed from the back of sidewalk from south of the
proposed south entry in order to construct a fill slope (2:1) behind the sidewalk and to construct
a catch basin to collect localized building and land runoff west of the existing building. A second
temporary construction easement will be needed east of the proposed bio-swale to construct
H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-3531 Lake Washington Blvd -Hawks'
Landing\1201 Easements\Lake_Wash_Blvd_ESMTbulletneeds_100325.docx\STLtp
the drainage connection for existing runoff that currently is piped into the Lake Washington
Boulevard North ditch. Finally, the last temporary construction easement for staging,
constructing the WSDOT connection under the north access road and material deliveries will be
needed. The staging area can be moved to an area that will not disrupt the property owner's
operation for the site.
The City's Storm and Water System Improvement construction plans are currently at 35% design. The
City will not start the permitting process to proceed with the 60% design plans until a determination of
the WSDOT easement needs are agreed upon by the property owner. The 60% design plans are needed
by WSDOT in order for them to move forward with their easement release appraisal process. A written
assurance by the Port Quendall Company for the following items is needed:
• The Port Quendall Company owner agrees to authorize the City of Renton to submit permit
applications for Environmental Review, Shoreline Review, and JARPA Application that includes
work on the privately -owned property (bio-filtration swale, new 24" storm system in a new
WSDOT easement, and sidewalk).
• The Port Quendall Company agrees to grant the City of Renton the required easement for the
bio-filtration swale and sidewalk area to be located on private property south of the proposed
Hawks' Landings Hotel project. In addition, the Port Quendall Company will grant a temporary
construction easement for the new 24-inch storm system on the north end of the property, to
be constructed by the City and located in a new WSDOT easement. The City would provide the
Port Quendall Company the final easement documents to review and approve prior to the
advertisement of the City project for construction.
• The Port Quendall Company agrees to grant WSDOT a new easement of approximately 1,960
square feet in exchange for WSDOT releasing the existing WSDOT easement located under the
proposed Hawks' Landing Hotel building.
• The Port Quendall Company or the Hawks' Landing Hotel developer agrees to assume payment
responsibilities for any compensation required by WSDOT for the release of the existing WSDOT
easement on the property, if there is any compensation required, which will be determined
after appraisals are completed and negotiations with WSDOT.
• The Port Quendall Company agrees to grant the City temporary construction easements, the
construction of back of sidewalk slopes, and installation of storm system catch basin to provide
drainage to the private property.
H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-3531 Lake Washington Blvd -Hawks'
Landing\1201 Easements\Lake_Wash_Blvd_ESMTbulletneeds_100325.docx\STLtp
Rentonnet City Clerk Card File
Page 1 of 1
CiMe
ty Clerk Card Fite
Record 15 of 22 0 0
Title:
PRELIMINARY PLAT, LAKE WASHINGTON VIEW ESTATES DIV 2/LK WA BLVD N
2008
Effective Date:
Jun 9, 2008
Date Entered:
Sep 9, 2008 by User: CMoya
Last Modified:
Mar 8, 2010 by User: jseth
Scheduled Destruction
Date: Destroyed Date:
Narrative:
■ 06/09/2008 - Application for Preliminary Plat and Shoreline Management
Substantial Development permit by Greg Fawcett, Rob -Clarissa Partnership
on behalf of The Rob -Clarissa Partnership & Clarissa M. Fawcett, owner
(Contact: Jim Hanson, Hanson Consulting), for the subdivision of a 5.53 acre
parcel into 13 single-family residential lots, located at 4200 Lake Washington
Blvd N, known as the Lake Washington View Estates.
■ PID 3224059081
■ 8/5/2008 — Public Hearing
■ 8/14/2008 - Hearing Examiner's Decision, approved subject to conditions
■ 8/25/2008 — Shoreline Management Substantial Development Permit
Approval
■ 9/15/2008 - Council approval
Keywords:
■ LUA-08-057 (SEE PP)
■ SM-08-057 (SEE PP)
■ PP-08-057
■ LAKE WASHINGTON VIEW ESTATES DIV 2 2008
■ FAWCETT GREGG 2008
■ THE ROB CLARISSA PARTNERSHIP 2008
■ FAWCETT CLARISSA 2008
■ HANSON JIM 2008
■ HANSON CONSULTING 2008
■ 4200 LAKE WASHINGTON BL N 2008
Location:
BANK 4 Category:
http://rentonnet.org/intranetICityClerkDept/CardFile/index.cfm?fuseaction=showdetail&... 03/ 19/2010
Rentonnet City Clerk Card File
Page 1 of 1
city emp""w4m. card File
Record 16 of 22 0
Title: PRELIMINARY PLAT, LAKE WASHINGTON VIEW ESTATES DIV 1/LK WA BLVD N 2007
Effective Date: Apr 3, 2007
Date Entered:
Aug 14, 2008 by User: SWeir
Last Modified:
Sep 9, 2008 by User: cmoya
Scheduled Destruction Date:
Destroyed Date:
Narrative:
■
04/03/2007 - Application for Preliminary Plat, Environmental (SEPA) review,
and Shoreline Management Substantial Development permit by Volarehigh
Land Development LLC, on behalf of The Rob -Clarissa Partnership &
Clarissa M. Fawcett, owner (Contact: Jim Hanson, Hanson Consulting) for
the subdivision of a 5.53 acre parcel into 13 single-family residential lots,
located at 4200 Lake Washington BI, known as the Lake Washington View
Estates.
■
PID 3224059081
■
10/22/2007 - ERC Review — Determination of non -significance, mitigated.
■
11/20/2007 — Public Hearing — applicant requested additional time to modify
plat.
■
3/27/2008 — Application dismissed by Hearing Examiner for failure of the
applicant to diligently pursue the application.
Keywords:
■
LUA-07-039 (SEE PP)
■
ECF-07-039 (SEE PP)
■
SM-07-039 (SEE PP)
■
PP-07-039
■
LAKE WASHINGTON VIEW ESTATES DIV 1 2007
■
VOLAREHIGH LAND DEVELOPMENT LLC 2007
■
THE ROB CLARISSA PARTNERSHIP 2007
■
FAWCETT CLARISSA M 2007
■
HANSON CONSULTING 2007
■
HANSON JIM 2007
■
4200 LAKE WASHINGTON BL 2007
Location:
BANK 4
Category:
http://rentonnet.org/intranetICityClerkDeptICardFile/index.cfm?fuseaction=showdetail&... 03/19/2010
Steve Lee
From: Abdoul Gafour
Sent: Wednesday, September 01, 2010 2:01 PM
To: Stacey Clear
Cc: Steve Lee
Subject: RE: Hawk's Landing
Attachments: detail-090110.pdf; dead-man-block.pdf, STD PLAN 330.2-Layout1.pdf
Hello Stacy,
Your proposal to use of the 2- 90 degree bends instead of the 22.5 or 45 degree bends at Sta. 11+15, is
acceptable, in order to reduce the cutting into the existing concrete panels.
Since there may not be sufficient room behind the new westerly bend due the vicinity of the 12" high pressure
gas line, to accommodate a much larger block for the 90 degree bend, we will need to install a new dead -man
block on the east side of the new bend. The south side of the bend will be restrained with shackled rods to
the existing dead -man block south of the connection point. See attached sketch.
I am also attaching a copy of the City's special detail for a dead -man block, which you can either show on the
plan sheet, or insert it in the back of the specifications book along with other related standard details.
As you know, the static pressure is about 120 psi, the test pressure will be 270 psi, and as such the size, and
bearing area of the thrust block for the easterly bend will be significantly increased from changing the 22
degree to a 90 degree bend.
Let me know if you have any questions,
Sincerely,
Abdoul Gafour
Water Engineering Supervisor
City of Renton Public Works
1055 S Grady Way
Renton, WA 98057
425-430-7210
agafour@rentonwa.gov
From: Stacey Clear [mailto:sclear@g-o.com]
Sent: Tuesday, August 31, 2010 11:50 AM
To: Abdoul Gafour
Cc: Steve Lee
Subject: Hawk's Landing
Hello Abdoul,
Would you entertain putting a 90 degree bend at Station 11+15 (south end of the Hawk's Landing project) so that we
could just do a straight sawcut across the concrete panels to the east side of the road instead of having to cut them at an
angle?
Stacey Clear, P.E.
Design Engineer
Gray & Osborne, Inc.
3710 168th St. NE, Suite B210
Arlington, WA 98223
Ph(360)454-5490
Fax (360) 454-5491
Electronic File Transfer -
Note that these electronic files are provided as a courtesy only. Gray & Osborne, Inc. in no way guarantees the accuracy
or completeness of the digital data contained within these files. Furthermore, Gray & Osborne, Inc. assumes no liability
for any errors or omissions in the digital data herein. Anyone using the information contained herein should consult the
approved or certified hard copy drawings or reports for the most current information available.
l.Al� UJ 1 • t�lt/tD �i . �, � g�c,�cc. Gha�v'+��
12 t��4��L NPriu ± S•r'P 11 } IS y I �1 to
.. . .. .. .. ..
:. .: :. .:. .:. :. ...
l ' �t it
... .. .. .. .. .. .. .. .. .. ........ .. .. .� .. ... ... .. ...
.............:....
1..:.t��....�_...:.._.......................;.............._......._..:.... _ ... _. _ .....
Atula
_ _hnct..:........:� __.. .....
f i .6V ....._..... tea+ 1Z" G'V Y. pEi .� S ' .. ..
:. .:. .:. .. ... _
.:..:. . .: .:..:. :
� �b c�c iSh r
_...._�.....__.._.._......�.................. .. _. ._ _. _. _
.............. .. .. .. ..
_............ :.... _.... �............. _.............:... ....................... ..........
Rini n
... .. ...('A:. lac... ..
.. .. .. .. .. i .. .. .. .. .........
.. .. .. .. .. .. .. t .. .. .. ..
.. .. .. t .. .. .. .. .. .. .. .. .. .. ..
.. .. ... ... ....................... ... ' .. ... ... ... .. .....
i.. .. .. .. .. .. .. .. .. .. .. ..
.. .. .. .. .. .. .. .. .. .. .. .. .. .. ..
i .. .. .. ..
.. .. ...�...
.. .... ` .... ... ... ... ... ... ... .. ... .. ... ... ...
...
................
.. .. .. ..
..................... ... ... ... .. .. ... ......................................
................... ...................
...................
.. .. .. .. .. .. .. .. .. .. .. .. .....
.... .. .. .......
TOP SECTION VIEW
NOT TO SCALE 1E'
MEGALUG
GLAND
O„ 4
c O n
o
r
TURBED EARTH
DEAD END ANCHOR SCHEDULE
III OF
LINE SIZE
'A'
'B'
'C'
'D'
3/4'
RODS
6'
2'-0'
1'-0'
1'-6'
1'-0'
2
8'
2'-0'
1'-6'
1'-6'
2
10'
2'-6'
1'-6'
1'-6'
1'-6'
2
12'
2'-6'
2'-0'
1'-6'
1'-6'
4
16'
3'-0'
2'-6'
2'-0'
NOTES:
1. CONCRETE SHALL 3000 P.S.I.
2. REINFORCED BARS SHALL BE DEFORMED BARS AND TIED TOGETHER.
3. PLACE THRUST COLLAR ON ONE FULL JOINT OF PIPE
4. FORMWORK AT FACE OF ANCHOR WALLS MUST BE REMOVED.
BACMLL AT FACE OF ANCHOR WALL MUST BE
COMPACTED TO 95X MAX DRY DENSITY BASED
ASTM D1557 PRIOR TO REINSTATING SERNCE OF THE WATER MAIN.
THRUST COLLAR & BLOCKING WITH MEGALUG RETAINER GLAND
NOT TO SCALE
\!
II SIDE
0V
SECTION VIEW
NOT TO SCALE J
ai
3/4' CORTEN CONTINUOUS
THREAD RODS INSTALLED
SYMME1171CALLY AROUHD PIPE
IN
TO MATCH BOLT HOLES
(SEE TABLE BELOW)
• I • c
• I
0 . ' i • P
SEE TRENCH DETAIL
A' MAX. AT COLLAR
A 'A'
Ilrl. MAXWUM ANAL.
ELEVATION VIEW
NOT TO 9CAU
10/22/07 NEW DETAIL LC AG
h
�111!_La.!
3' MIN. (10' PIPE h SMALLER)
MIN. (12' PIPE R LARGER)
µ REBAR AT e' ON CENTER
WITH 180' STANDARD HOOKS
O BOTH ENOS
MEGALUG SERIES I100/1100SO
MECHANICAL JOINT
RESTRAINER GLAND FOR O.I.P.
THRUST COLLAR & BLOCIUNG
WITH MEGALUG RETAINER GLAND
ADOPTED
crrr of NRIITON
WrANDM PLAWH
LAT D47C:10/07
DWG. NAME.:TCB-1 SP PACE:XXXXX
EE
11-1/4' BEND
- E a n--,, -
CAP
22-1/2-BEND 45' BEND
TEE
90' BEND
THRUST BLOCK BEARING AREA IN SQUARE FEET (SEE NOTES) FOR HORIZONTAL AND DOWNWARD VERTICAL BENDS
SOIL
FIRM SILT OR
FIRM SILTY SAND
COMPACT SAND
COMPACT SAND & GRAVEL
90'
45' BEND
11 1/4-
90'
45' BEND
11 1/4'
90'
45- BEND
11 1/4'
FITTING
BEND
TEE
CAP OR PLUG
& 22 1/2'
BEND
TEE
CAP OR PLUG
& 22 1/2-
BEND
TEE
CAP OR PLUG
& 22 1/2-
BEND
BEND
BEND
4"
7.0
4.2
4.2
1.7
2.9
2.1
2.1
1.0
2.2
1.6
1.6
1.0
6"
13.3
9.4
9.4
3.8
6.7
4.7
4.7
1.9
5.0
3.5
3.5
1.4
8"
23.3
16.7
16.7
6.7
11.7
8.4
8.4
3.4
8.6
6.3
6.3
2.5
12'
53.0
37.5
37.5
15.0
26.5
18.8
18.8
7.5
20.0
14.0
1 14.0
5.6
AREAS CALCULATED ON 300 PSI TEST PRESSURE. 3'-0" MIN. COVER FOR WATERMAIN LESS THAN 12".
4'-0" MIN. COVER FOR WATERMAIN 12" OR GREATER.
MAX. HEIGHT OF THRUST BLOCK (FT) - 0.5 x DEPTH OF TRENCH
MIN. HEIGHT OF THRUST BLOCK (FT) - O.D. PIPE + 1.0'
TRUST BLOCK BE,
2EA REFERS TO '
SCE OF BLOCK MI
IN SCUARE FEET
NOTES
1. LOCATION AND SIZE OF BLOCKING FOR PIPE LARGER THAN 12-DIAMETER AND FOR SOIL TYPES
DIFFERENT THAN SHOWN SHALL BE DETERMINED BY THE ENGINEER.
2. ALL BLOCKING SHALL BE POURED IN PLACE AGAINST UNDISTURBED NATIVE GROUND.
3. ALL POURED THRUST BLOCKS SHALL BE BACKFILLED AFTER MIN. 1 DAY. PRESSURE TESTING
SHALL OCCUR AFTER CONCRETE HAS REACHED NOMINAL COMPRESSIVE STRENGTH.
4. ALL BLOCKING SHALL BE CONCRETE CL 5 (1-1/2-).
S. BLOCKING AGAINST FITTINGS SHALL BEAR AGAINST THE GREATEST FITTING SURFACE AREA
POSSIBLE, BUT SHALL NOT COVER OR ENCLOSE BELL ENDS, JOINT BOLTS OR GLANDS
REASONABLE ACCESS TO BOLTS AND GLANDS SHALL BE PROVIDED.
CONCRETE BLOCKING FOR STD. PLAN - 330.2
a �• PUBLIC WORKS
� HORIZONTAL AND DOWNWARD
�� - DEPARTMENT VERTICAL BENDS MARCH 2O10
1. CEMENT CONCRETE CURBS as shown in the plans shall meet the requirements of the City
of Renton Standard Plan.
2. CEMENT CONCRETE CURB TREATMENT AT DRAINAGE STRUCTURE as shown
in the plans shall meet the requirements of the City of Renton Standard Plan.
3. CEMENT CONCRETE DRIVEWAY ENTRANCE Types R1, C2, C3, and C-MAX (with or
without buffer) where shown in the plans, shall meet the requirements of the City of Renton
Standard Plan.
4. CEMENT CONCRETE SIDEWALK as shown in the plans shall meet the requirements of the
City of Renton Standard Plan. Monolithic Cement Concrete Curb and Sidewalk, if installed,
will not be accepted by the Owner.
5. ASPHALT PATCHING, as shown in the plans, shall meet the requirements of the following
City of Renton Standard Plans:
CURB AND GUTTER REPLACEMENT DETAIL,
TYPICAL LONGITUDINAL PATCH AND OVERLAY FOR FLEXIBLE
PAVEMENT, or
TYPICAL TRANSVERSE PATCH FOR FLEXIBLE PAVEMENT
6. SIDEWALK RAMP Type 1, Type 2, and Type 3A, where shown in the plans, shall meet the
requirements of the City of Renton Standard Plan.
7. SIDEWALK RAMP Type 3B, Type 4A, Type 4B, or Type 4C, where shown in the plans, shall
meet the requirements of the WSDOT Standard Plan. Type 5 shall not be used.
8. GROUND MOUNTED SIGN PLACEMENT shall meet the requirements of the WSDOT
Standard Plan.
9. TIMBER SIGN SUPPORTS as shown in the plans shall meet the requirements of the WSDOT
Standard Plan.
10. SIGN INSTALLATION ON SIGNAL AND LIGHT STANDARDS as shown in the plans shall
meet the requirements of the WSDOT Standard Plan.
11. SIGN BRACING as shown in the plans shall meet the requirements of the WSDOT Standard
Plan.
12. MAILBOX SUPPORT Type 1, Type 2, or Type 3, as shown in the plans shall meet the
requirements of the WSDOT Standard Plan. Snow Guards shall be omitted from the
installation.
13. MAILBOX CLUSTER BOX UNIT (CBU) AND SIDEWALK WIDENING as shown in the
plans shall meet the requirements of the City of Renton Standard Plan.
14. MONUMENT CASE AND COVER, as shown in the plans shall meet the requirements of the
City of Renton Standard Plan.
15. BOLLARD Type 1 or Type 2, as shown in the plans shall meet the requirements of the WSDOT
Standard Plan.
16. SURVEY STAKE MARKINGS shall meet the requirements of the WSDOT Standard Plan.
17. EROSION CONTROL Measures as shown in the plans, whether Silt Fence, Storm Drain Inlet
Protection, Check Dams, Straw Bale Barriers, Wattles, or Blankets, shall meet the requirements
of the corresponding WSDOT Standard Plan.
18. HIGH VISIBILITY FENCE as shown in the plans shall meet the requirements of the WSDOT
Standard Plan.
19. WORK ZONE TRAFFIC CONTROL PLANS submitted for approval shall meet the
requirements of the WSDOT Standard Plans.
20. MOTORCYCLE SUPPLEMENTAL SIGNING as shown in the plans shall meet the
requirements of the WSDOT Standard Plan.
21. TEMPORARY CHANNELIZATION as shown in the plans shall meet the requirements of the
WSDOT Standard Plan.
22. CLASS A CONSTRUCTION SIGNING INSTALLATION as shown in the plans shall meet the
requirements of the WSDOT Standard Plan.
23. TYPE 3 BARRICADE as shown in the plans shall meet the requirements of the WSDOT
Standard Plan.
24. TEMPORARY CONCRETE BARRIER as shown in the plans shall meet the requirements of
the WSDOT Standard Plan. All Temporary Concrete Barrier shall be anchored per the
requirements of the WSDOT Standard Plan.
25. ACCESS CONTROL GATES as shown in the plans shall meet the requirements of the WSDOT
Standard Plan.
26. GORE AREA MARKINGS as shown in the plans, whether painted, thermoplastic, or
supplemented and/or substituted with Raised Pavement Markers, shall meet the requirements of
the WSDOT Standard Plan.
27. TWO-WAY LEFT -TURN AND MEDIAN CHANNELIZATION as shown in the plans shall
meet the requirements of A Policy On Geometric Design Of Highways And Streets, the
American Association of State Highway and Transportation Officials (AASHTO), Fifth Edition.
28. HIGH OCCUPANCY VEHICLE (HOV) LANE MARKINGS as shown in the plans, whether
painted or thermoplastic, shall meet the requirements of the WSDOT Standard Plan.
29. BICYCLE LANE MARKINGS as shown in the plans, whether painted or thermoplastic, shall
meet the requirements of the WSDOT Standard Plan.
30. RAILROAD CROSSING MARKINGS as shown in the plans, whether painted or thermoplastic,
shall meet the requirements of the WSDOT Standard Plan.
31. LONGITUDINAL MARKING PATTERNS ("Lane Lines") as shown in the plans, shall meet
the requirements of the City of Renton CHANNELIZATION MARKERS DETAIL
Standard Plan.
The WSDOT Standard Plans are available in PDF Format at:
http://www. wsdot.wa. gov/eesc/design/design$tandards[HTM/fOC.htm
The City of Renton Standard Details are available in PDF Format at:
http://rentonwa.gov/business/defaull.aspx?id=1324
STREETS
STANDARD PLAN 100
May, 2009
MEMORANDUM
TO: Steve Lee, City of Renton
FROM: Stacey Clear, P.E.
Barry Baker, P.E.
DATE: July 15, 2010
SUBJECT: Design Issues for Hawk's Landing
Gray & Osborne held a Quality Assurance/Quality Control review of the project on July
14, 2010. In this process, senior level staff not directly involved in the process, reviewed
the plans and specifications and provided comment and feedback. The meeting was
conducted with Barry Baker, Stacey Clear, Tim Osborne (Senior Transportation Manager
at G&O), and Roger Kuykendall (Stormwater and City Engineer for various G&O
clients). Since these senior level staff members have not been a part of all the discussions
with the client, some issues raised may have already been addressed or direction was
already provided by the client.
As a result of our internal quality assurance/quality control meeting, we have listed a
number of concerning issues related to the design of the Hawk's Landing project as it
exists today. The issues raised are as follows.
CONCERNS
Concrete Panels
We need to verify if concrete panels exist and what depth the concrete is likely to be in
the roadway. Is there any geotech information in close proximity (i.e the Ripley Lane
project, WSDOT I-405 improvements, bridge installation) that confirms that concrete
panels exist under the roadway and where these panels might be located within the road
prism? We note the 1991 Earth Consultants Report has no data on Lake Washington
Boulevard.
It is presumed by looking at the survey that the existing utilities are located in their
current alignment to avoid concrete panels in the roadway. This forces the water main to
either be in the concrete panels or off the roadway. It will be costly to place the water
main within the roadway if concrete panels exist, both in sawcutting and in restoration.
We are unaware of the city standards on trenchlroad restoration through concrete panels
but in doing a quick cost estimate based on the assumption of filling the trench with
bankrun gravel, 18" of CDF and then 6" of HMA on top of the CDF, we find that the
water main would cost approximately $33,000 more if concrete panels were present. The
July 20, 2010
Page 2
additional cost involves primarily the addition of CDF and extra sawcutting depth. For
our estimate, we used CDF and extra sawcutting prices from jobs we are currently
working on. Although not included in the price above, removal of structures and
obstructions and traffic control would be greater as well. If the city standard is to replace
the entire concrete panel, the cost would be significantly more.
Utility conflicts
Gas Main Conflict
At Station 11+10, where the new fire hydrant is supposed to be located, it appears there is
a conflict with the 12" high pressure gas main and the 6" fire hydrant stub. We would
propose moving this fire hydrant to a location on the east side of the road. One
alternative is to replace the existing 8" main that crosses the road with a new 12" main.
We would then keep the 12" water main on the east side of road, out of the concrete
panels in the roadway for the remainder of the project (to Station 25+35). The water main
could follow the new curb line. To maintain the city's separation requirement, the
stormwater pipe would have to move further east, closer to the existing ditch line.
Fiber Optics
At Station 20+55, a 12" DI water main stub is intended to cross over the fiber optics
located in this area. Fiber optics are always difficult to contend with. If the water main
were placed under the curb line, we would avoid the fiber optics.
Drainage along Roadway
Due to the flat elevation along the road between Station 17+50 and 21+50, the City may
need to provide an additional type 1 catch basin/inlet placed along this curb alignment to
ensure drainage of this flat area. If needed in the future, Inserta tees could easily be used
on the 24" pipe if the City needed to go in after the project was completed to help
eliminate ponding in an unforeseen low spot.
Pervious Concrete Sidewalk
Due to the vehicle weight restrictions, we recommend leaving driveway/maintenance
access entrances as regular, non -pervious concrete. In addition, we wanted to make the
City aware that pervious concrete sidewalks typically cost at least 10% more than non -
pervious concrete sidewalks and are usually not as visually appealing as typical sidewalks
due to the large voids present. Likewise, drainage will seep under the sidewalk and is
likely to continue to flow to the area where it currently goes today (i.e. toward the
proposed wet bioswale).
July 20, 2010
Page 3
RECOMMENDATIONS
We are aware that some of these issues have been discussed previously with the City.
The recommendations from the QA/QC team are:
• Confirm the presence/absence of concrete panels. _` f ('
• If the panels are present, move the new 12" water main to the east side of the road,
away from the presumed concrete panel and under the proposed curb line. This
recommendation is based on the extensive production cost of working in concrete
panels, restoration requirements, and due to the indicated utility conflicts.
• Due to the separation requirement, the storm water pipe would move to the
existing ditch line.
• Provide standard concrete driveway ramps through the sidewalk for
driveway/maintenance access.
• Complete a proposed curb and gutter design for number and placement of
catchbasin/inlets and as a result, multiple type 1 catch basins may need to be
added between Section 17+50 and 21+50.
** 5 ? ct S � 6 4 e, fk- .
July 20, 2010
Page 3
RECOMMENDATIONS
We are aware that some of these issues have been discussed previously with the City.
The recommendations from the QA/QC team are:
• Confirm the presence/absence of concrete panels.
• If the panels are present, move the new 12" water main to the east side of the road,
away from the presumed concrete panel and under the proposed curb line. This
recommendation is based on the extensive production cost of working in concrete
panels, restoration requirements, and due to the indicated utility conflicts.
• Due to the separation requirement, the storm water pipe would move to the
existing ditch line.
• Provide standard concrete driveway ramps through the sidewalk for
driveway/maintenance access.
• Complete a proposed curb and gutter design for number and placement of
catchbasin/inlets and as a result, multiple type 1 catch basins may need to be
added between Section 17+50 and 21+50.
Steve Lee
From: Stacey Clear [sclear@g-o.com]
Sent: Tuesday, July 27, 2010 9:25 AM
To: Steve Lee; Abdoul Gafour
Cc: 'Barry Baker'
Subject: Specs
Steve,
In regards to the specs, we had the following questions:
Thanks.
pI I- J .,S -
Which WSDOT specs should we be referring to (2006? 2008;, 2010?
Should the 6" stubs to the fire hydrants be encased with polyethylene as well?
How would the City like pavement markings to be restored? In -kind? Are there new standards that the Contractor
will need to adhere to that differ than what's on the site?
Stacey Clear, P.E.
Design Engineer
Gray & Osborne, Inc.
3710 168th St. NE, Suite B210
Arlington, WA 98223
Ph(360)454-5490
Fax (360) 454-5491
Electronic File Transfer -
Note that these electronic files are provided as a courtesy only. Gray & Osborne, Inc. in no way guarantees the accuracy
or completeness of the digital data contained within these files. Furthermore, Gray & Osborne, Inc. assumes no liability
for any errors or omissions in the digital data herein. Anyone using the information contained herein should consult the
approved or certified hard copy drawings or reports for the most current information available.
MEMORANDUM
TO: Steve Lee, City of Renton
FROM: Stacey Clear, P.E.
Barry Baker, P.E.
DATE: July 15, 2010
SUBJECT: Design Issues for Hawk's Landing
Gray & Osborne held a Quality Assurance/Quality Control review of the project on July
14, 2010. In this process, senior level staff not directly involved in the process, reviewed
the plans and specifications and provided comment and feedback. The meeting was
conducted with Barry Baker, Stacey Clear, Tim Osborne (Senior Transportation Manager
at G&O), and Roger Kuykendall (Stormwater and City Engineer for various G&O
clients). Since these senior level staff members have not been a part of all the discussions
with the client, some issues raised may have already been addressed or direction was
already provided by the client.
As a result of our internal quality assurance/quality control meeting, we have listed a
number of concerning issues related to the design of the Hawk's Landing project as it
exists today. The issues raised are as follows.
CONCERNS
Concrete Panels
We need to verify if concrete panels exist and what depth the concrete is likely to be in
the roadway. Is there any geotech information in close proximity (i.e the Ripley Lane
project, WSDOT I-405 improvements, bridge installation) that confirms that concrete
panels exist under the roadway and where these panels might be located within the road
prism? We note the 1991 Earth Consultants Report has no data on Lake Washington
Boulevard.
It is presumed by looking at the survey that the existing utilities are located in their
current alignment to avoid concrete panels in the roadway. This forces the water main to
either be in the concrete panels or off the roadway. It will be costly to place the water
main within the roadway if concrete panels exist, both in sawcutting and in restoration.
We are unaware of the city standards on trench/road restoration through concrete panels
but in doing a quick cost estimate based on the assumption of filling the trench with
bankrun gravel, 18" of CDF and then 6" of HMA on top of the CDF, we find that the
water main would cost approximately $33,000 more if concrete panels were present. The
July 20, 2010
Page 2
additional cost involves primarily the addition of CDF and extra sawcutting depth. For
our estimate, we used CDF and extra sawcutting prices from jobs we are currently
working on. Although not included in the price above, removal of structures and
obstructions and traffic control would be greater as well. If the city standard is to replace
the entire concrete panel, the cost would be significantly more.
Utility conflicts
Gas Main Conflict
At Station 11+10, where the new fire hydrant is supposed to be located, it appears there is
a conflict with the 12" high pressure gas main and the 6" fire hydrant stub. We would
propose moving this fire hydrant to a location on the east side of the road. One
alternative is to replace the existing 8" main that crosses the road with a new 12" main.
We would then keep the 12" water main on the east side of road, out of the concrete
panels in the roadway for the remainder of the project (to Station 25+35). The water main
could follow the new curb line. To maintain the city's separation requirement, the
stormwater pipe would have to move further east, closer to the existing ditch line.
Fiber Optics
At Station 20+55, a 12" DI water main stub is intended to cross over the fiber optics
located in this area. Fiber optics are always difficult to contend with. If the water main
were placed under the curb line, we would avoid the fiber optics.
Drainage along Roadway
Due to the flat elevation along the road between Station 17+50 and 21+50, the City may
need to provide an additional type 1 catch basin/inlet placed along this curb alignment to
ensure drainage of this flat area. If needed in the future, Inserta tees could easily be used
on the 24" pipe if the City needed to go in after the project was completed to help
eliminate ponding in an unforeseen low spot.
Pervious Concrete Sidewalk
Due to the vehicle weight restrictions, we recommend leaving driveway/maintenance
access entrances as regular, non -pervious concrete. In addition, we wanted to make the
City aware that pervious concrete sidewalks typically cost at least 10% more than non -
pervious concrete sidewalks and are usually not as visually appealing as typical sidewalks
due to the large voids present. Likewise, drainage will seep under the sidewalk and is
likely to continue to flow to the area where it currently goes today (i.e. toward the
proposed wet bioswale).
Steve Lee
From: Vanessa Dolbee
Sent: Tuesday, August 17, 2010 9:06 AM
To: Steve Lee
Subject: RE: Lake Washington Blvd: Planning and DSD comments
This all sounds great. Thank you.
From: Steve Lee
Sent: Tuesday, August 17, 2010 8:45 AM
To: Vanessa Dolbee
Subject: RE: Lake Washington Blvd: Planning and DSD comments
Reponse to your comments:
1. Sidewalk detail will be supplemented with a cross section detail with width of landscape strip. It was noted in
my redline comments to them already.
2. This was the 60% plan submittal, before landscaping was forced on us a few weeks ago by Parks and Planning.
We are working the addendum to get the LS architect on board that Parks wants. The LS architect Parks
suggested has been scoping the work to ensure what is needed is provided. The last second addition of LS (not
in SEPA submittal remember) may cause us to delay the project bid opening... It will be included in the 90% plan
submittal. We cannot redo the 60% plan submittal since that would require a re -scope and increased consultant
fees and additional delays.
3. The sidewalk easement line follows the street curbing, not the sidewalk. The sidewalk location was suggested
by HL and approved by Transportation, but the ROW dedication line follows the curb offset of 0.5 feet for curb
width, 12 feet for landscape width (does not matter if there is an entrance of not since we do not fully know if
HL will fund their project, then we will need that full offset), 10 feet for sidewalk and 1 feet for back of sidewalk.
That is why the different location... which follows the curb, not the sidewalk. Note that landscaping tapers to the
proposed, future south HL entryway... Therefore the difference in the ROW dedication line and back of sidewalk.
4. Note will be added for the 90% plan set. We cannot redo the 60% plan set 3 or 4 times.
Hope this answers your questions...
-Steve
From: Vanessa Dolbee
Sent: Tuesday, August 17, 2010 8:25 AM
To: Steve Lee
Subject: RE: Lake Washington Blvd: Planning and DSD comments
Steve,
The following are a few minor comments/questions about the 60% plans.
- The Sidewalk detail does not include the landscape strip between the back of the curb and the sidewalk.
However the width was corrected.
- Landscaping was not provided on any of these plan sets, will this come later? (I know it is a new item).
- The sidewalk easement line is still in a weird location, is this what was intended?
- Did we need a note on the plans about plating the pervious sidewalk?
Thank you for the opportunity to review the plans.
16� nessa (Dolbee
CED, x7314
From: Steve Lee
Sent: Monday, August 16, 2010 2:53 PM
To: Arneta I Henninger; Vanessa Dolbee
Subject: Lake Washington Blvd: Planning and DSD comments
Attached are the 60% plans. Please provide comments. I have numerous redlines already from water and surface
water, but would lie to send to you for planning and development services review. You will note that items needed
include revising page numbers correctly, labeling street names in some sheets, etc.
Thanks,
Steve Lee
c_� ' ' `��
(� C��J�c.�.Wl.�-��� vim- �,
��
Y
m
c
m
JN
Y
2
a
m
DO
Ln
In
0
0
Z
O
H
LU
Ce
SECTION 32, TWP 24 N, R 5 E, W.M.
CITY OF RENTON
LAKE WASHINGTON BLVD. NORTH STORM AND WATER SYSTEM IMPROVEMENT PROJECT
PROJECT SWP-27-3531
SECTION 32, TWP 24 N) R 5 E, W.M.
PROJECT PLAN AND SURVEY CONTROL
SCALE: 1 '=200'
SURVEY CONTROL POINTS
POINT
NORTHING
EASTNG
EleV.
DESCRIPTION
CAP'GAO CONTROL', N GRAVELNW
100
19584539
130220231
42.93518-REBAR/RED
SIDE LW BLVD, TN W OF EP, 14.5N W OF WTR VALVE
LGMAG NABlTAG'G&0 CONTROL', N BWCURB NW
101
19605/.91
130233626
39.
COR S/WALK NTXLW BLVD/N.41ST ST @ PT
102
195784.74
1302198.44
43.99
CASED 21/2' BRASSY W/'X' 11i "l— RLS 23613', N. BND
LANE LW BLVD, 79 SW ENTR TO EAST SHORES APT.
103
19592890
1302284
41.70
CASED 21/2-BRASSY W/ PUNCH B'1997 RLS 23613'. 90'
NNW OF CL ENTR TO EASTPORT SHORES APT.
104
19WT527
1302513.82
35.93
BENCHMARK 3- DOMED BRASSY, NO MARK CL E.
SAVAU( OF BRIDGE, F N. OF S. EDGE S/1V ALK
105
196728.81
13D274239
3,,
LG MAG NAl/TAG'G80 OONTROL',INTX OF LW BLVD/
N. 43RD ST IN 1144 OF BK/CURB OF S'LY CURB RETURN
3' DOMED BRASSY W/ PUNCH A CROSS'T24N, R5E' 8
106
19676355
1302B31
33.D4
'PLS 247801995', SE SHOULDER LW BLVD, 3' N W OF
CURB, JUST N. OF NTX W 1 N 43RD
LG MAG NAIL/TAG-G80 CONTROL', N ASPHALT 5' N.
107
196903.74
130301151
4 _
OF CURB IN SSW COR NTX LW BLVD/RPLN N, a!-
15' SE FROM END OF FOGLNE
CASED 1 3/4- BRASSY W/ PUNCH, W SIDE RPLEY LN,
106
197011.82
1302948A0
45.d
N.PW.OF ROVED CURB, NEXT TO E'LY TURN ARROW
SGN..J_50, W/ OF LW BLVD
109
19674449
1303748.13
37.36
CASED BRASS PIN IN CON C. POST
HORIZ. DATUM: NAUM,51.911, VLKI. UAIUM: NAVU6tl
INDEX
SHEET NO. DESCRIPTION
1
COVER VICINITY do LOCATION MAPS AND
INDEX, SURVEY CONTROL TABLE
2
SYMBOL LEGEND, ABBREVIATIONS
3-4
EROSION CONTROL (TESC)
5-9
STORM DRAINAGE IMPROVEMENT PLAN do
PROFILE, STORM DETAILS
10-12
PLAN AND PROFILE
13
UTIUTY DETAILS
14
WATERLINE RESTRAINT DETAIL
15
CURB, OVERLAY & RESTRIPING PLAN
CHFGKF➢ FOR COMPLIANCE WITH CITY STANDARDS
BY----------------- Date '--------
BY�---------------- Date ---------
By ---------------- Dote'------
BYI--------------- Date' --------
RECOMMENDED FOR APPROVAL
...................
Dote'--------
BY'---------------- Date'--------
HY�--------------- Date'--------
BY'Date-________
PROPERTY LINE DISCLAIMER
The orvert or lk—
=sho.n Ic+ran n
.� oRe a nFrnoton, ro: .
+.Yed 1omS nM ore Pdy
aPp—dNete.
Tm 11 Hgu-
p, d �Y ANN EST CENTER
(ONE CALL CENT I-aO0-Q-5555) FORFlwE1D U7GTION nON of LMUTIES.
THE CONTRACTOR SHALL BE RESPONSIB E FOR VERIFYING THE LOCATION.
ee� �� DT`s Q Department oCommerce WHETHER
AND
DEPTH ES ALL PLANS
OR NOT.
By tHOU THE PROJECT,
h 1111EfH1U SHONN ON THESE PAND OR NOT, L DCA OUNG THE UnUT16
AM SURVEYING THE VERTICAL AND HORIZONTAL LOCATION PRIOR TO
K ; • e t �` { our
WNNWWUUY OFTRU FIVE wCTOONNGG DAYS RIN ADVANCE OF OWLICTS SHALL
PIPELIN 1TREND 4
' pogC ••F 3T3A.�e `}6'` <r ••e s' +`�" Innovation 1 s # 1 1 V u r nature. AYNVAION. THE
UnnunES � SUBJECT TO PLANS
RE BASED
CONFLICTS
�S70NAL G s"ONAL OCCUR THE CONTRFGfOR SHALL CONSULT THE PROJECT ENGINEER TO
RESOLVE THE PROBIEY PRIOR TO POCEEDM WIN CONSTRUCTION. D — 3 5 3 11011
.0 � •� Is. CITY OF �7/20/10
PRELIMINARY .� LAKE WASHINGTON BLVD NORTH .�
B.P.B.TK
WATER &
Cs3nay �Qaborue, I33c NOT FOR DATUM REIN TON STORMIMPROVEMENTS WATER MAIN covER
o�. CJ.K.
CONSULTING ENGINEERS —SA.0 ' ' Public Works Dept.
o „ a CONSTRUCTION
1iATTLL vAsaN:'rTr Rsle� x.«�o N0. REVISION BY DATE APPR
T.a 1 '` 15
-7
ABBREVIATIONS
AVE AVENUE
AC ASBESTOS CEMENT PIPE
ADJ ADJUST
ALT ALTERNATE
ALUM ALUMINUM
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ASPH ASPHALT
ASTM AMERICAN SOCIETY OF TESTING AND MATERIALS
ASSY ASSEMBLY
BF BLIND FLANGE
BLDG BUILDING
BLK BLOCK
80 BLOW OFF
CTR CENTER
CAP CORRUGATED ALUMINUM PIPE
CB CATCH BASIN
CI
CAST IRON
q
CENTER LINE
CLR
CLEARANCE
CMP
CORRUGATED METAL PIPE
CO
CLEANOUT
CONIC
CONDUIT
CONN
CONNECTION
CONTR
CONTRACTOR
CONT
CONTINUOUS
CPEP
CORRUGATED POLYETHYLENE PIPE
CPLG
COUPLING
CY
CUBIC YARD
CONT
CONTINUED
CL
CLASS
CF
CUBIC FEET
ABBREVIATIONS
RED
REDUCER
REINF
REINFORCE
REEQD
REQUIRED
IGHT—OF—WAY
S(W
SLOPE
S
SOUTH
SCH
SCHEDULE
SF
SQUARE FEET
SFM
FOUND MONUMENT
SHT
SHEET
SPECS
SPECIFICATIONS
SQ
SQUARE
SSCO
SANITARY SEWER CLEANOUT
SSMH
SANITARY SEWER MANHOLE
SSNT
SET NAIL/TAG
SSRC
SET REBAR/CAP
STA
STATION
STD
STANDARD
TB
THRUST BLOCK
TC
TOP OF CURB
TEL
TELEPHONE
THIRD
THREADED
THRU
THROUGH
TYP
TYPICAL
VERT
VERTICAL
W
WEST
W/ WITH
W/0 WITHOUT
WTR WATER
DCUBIC FEET
CRDCDEGE
UCTI OCURVATURE SYMBOL LEGEND
DI DIRON
DIA DIAMETER EXISTING PROPOSED DESCRIPTION
DOT DEPARTMENT OF TRANSPORTATION
DIM
DWGS
DIMENSIO
DRAWING S)
RAIN
EOA
EDGE OF ASPHALT
EST
EACH
A
EL
ELEVATION
EL
ELBOW
ELEC
ELECTRICAL
EXIST
EXISTING
F
FORCE MAIN
FIG
FIGURE
FIN
FINISHED
FL
FLANGE
FT
FEET
FO
FIBER OPTIC —
FOC
FACE OF CURB
GA
GAUGE
GALV
GALVANIZED —
GI
GALVANIZED IRON
GV
CATE VALVE —
HDPE
HIGH DENSITY POLYETHYLENE PIPE
ID
INSIDE DIAMETER —
IE
INVERT ELEVATION
INV
INVERT —
IN
CURB & GUTTER
ASPHALT PAVEMENT
GRAVEL SURFACING
( CONCRETE SURFACING
L
LENGTH
---10---
LB
POUND
LF
LINEAR FEET
—TV
MAX
MAXIMUM
MFR
MANUFACTURER
FO--
MH
MANHOLE
MIN
MINIMUM
P—
MJ
MECHANICAL JOINT
MISC
MISCELLANEOUS
T
N
NORTH
W
NO
NUMBER
NTS
NOT TO SCALE
OC
ON CENTER
—G—
OD
OUTSIDE DIAMETER
PI
POINT OF INTERSECTION
—^
PP
POWER POLE
S
PVI
POINT OF VERTICAL INTERSECTION
PE
PLAIN END
SD
PERF
PERFORATED
PVC
POLYVINYL CHLORIDE
PVMT
PAVEMENT
PVT
POINT OF VERTICAL TANGENT
PC
POINT OF CURVATURE
PT
POINT OF TANGENCY
F—
QTY
QUANTITY
R
RADIUS
._ .
RET
RETAINING
RR
RAILROAD
P. L ANN
g4 +glt'�p e�+�' o+ ■ � pLeF�
37MO pp !4 mop NMI
s ,O
IOft6L
w
- D -
CONCRETE SIDEWALK
RIGHT—OF—WAY LINE
CENTERLINE OF ROADWAY
PROPERTY LINE
PERMANENT EASEMENT UNE
TEMPORARY EASEMENT UNE
CONTOUR LINE
BURIED CABLE TV
BURIED FIBER OPTIC
BURIED POWER
BURIED TELEPHONE
WATER MAIN (SIZE AS NOTED)
GAS MAIN
IRRIGATION UNE
SANITARY SEWER
STORM DRAIN
SANITARY SEWER FORCE MAIN
DITCH
SECTI%%y ftbIP L2e(yEjq(fp E, W.M.
SECTION 32, TWP 24 N, R 5 E, W.M.
EXISTING PROPOSED DESCRIPTION
0
MANHOLE OR DRYWELL (AS NOTED)
o
CLEANOUT
❑
■
TYPE 1 CATCH BASIN OR CURB INLET
®
TYPE 2 CATCH BASIN
POLE WITH GUY WIRE
..q_
POWER / TELEPHONE / GUY POLE
LUMINAIRE
YARD LIGHT
0
JUNCTION BOX (AS NOTED)
Da
H
CATE VALVE
Db
BUTTERFLY VALVE
®
WATER METER
T
FIRE HYDRANT
REDUCER
p
THRUST BLOCK
TRANSITION COUPLING OR
FLANGE COUPLING ADAPTER
7
CAP/PLUG
4
1
BLOW —OFF
Q
AIR RELEASE VALVE
o
MAIL BOX (NOTED)
SIGN
EMBANKMENT
NOTED
+-I TREE (CONIFER)
NOTED
Lr:I� TREE (DECIDUOUS)
SHRUBS
BUILDINGS
ROCK WALL
0 ELEVATION POINT
c9
MONUMENT
p
ANGLE POINT / CONTROL POINT
BENCH MARK
1
1
DETAIL NUMBER
REFERENCE SHEET
CULVERT (SIZE & TYPE AS NOTED) SH-1
FENCE (TYPE AS NOTED)
FENCE (WITH GATE)
TELEPHONE VAULT
POWER VAULT
TELEPHONE MANHOLE
GEOTECHNICAL BOREHOLE
GRADING QUANITIES
CUT: 2,380 cy
FILL: 2,450 cy
GENERAL CONSTRUCTION NOTES
1. ALL TYPE 2 CATCH BASINS AND ACCESS RISERS SHALL HAVE FLAT TOPS
2. LENGTHS OF PIPE AND INVERT ELEVATIONS ARE SHOWN AT CENTERLINE OF
STRUCTURE.
3. CONSTRUCTION WORK HOURS SHALL BE FROM 7:00 AM TO 5:00 PM, MONDAY
THROUGH FRIDAY UNLESS NOTED OTHERWISE IN THE SPECIFICATIONS.
4. LOCATE ALL CATCH BASIN AND MANHOLE FRAMES AND GRATES OUTSIDE OF
VEHICLE WHEEL PATH WHERE FEASIBLE.
5. ALL TYPE 1 AND 2 CATCH BASINS SHALL HAVE VANED GRATES EXCEPT WHERE
NOTED ON THE PLANS.
UTILITY NOTE:
THE CONTRACTOR SHALL CALL THE UTILITY LOCATION REQUEST CENTER
(ONE CALL CENTER; 1-800-424-5555) FOR FIELD LOCATION OF UTILITIES.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION,
DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WITHIN THE PROJECT,
WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOLING THE UTILITIES
AND SURVEYING THE VERTICAL AND HORIZONTAL LOCATION PRIOR TO
CONSTRUCTION. ALL POTENTIAL UTILITY CONFLICTS SHALL BE POTHOLED A
MINIMUM OF FIVE WORKING DAYS IN ADVANCE OF ANY PIPELINE TRENCH
EXCAVATION. THE UTIUTIES SHOWN ON THE PLANS ARE BASED UPON
AVAILABLE INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS
OCCUR THE CONTRACTOR SHALL CONSULT THE PROJECT ENGINEER TO
RESOLVE THE PROBLEM PRIOR TO PROCEEDING WITH CONSTRUCTION.
PRELIMINARY �= CITY OF LAKE WASHINGTON BLVD NORTH 7/20/10
9P.B. t R EN TON STORM WATER & WATER MAIN
Cry &O.bor>ae, Inc. NOT FOR C.I.K. DATUM IMPROVEMENTS
CONSIATING ENGINEERS � F PuWiC WOrki Dept 2
m Ionn .pou NaT� YR C !ID CONSTRUCTION
N0. REVISION BY DATE APPR
,R5E,W.M.
£ _� l—� ..---
------------
E. --------------
NOTES:
1. CONDITION OF USE
I.I. CONSTRUCTION ENTRANCE SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION
STE AND TRAVELING ON PAVED ROADS OR OTHER PAVED AREAS WITHIN 1.000 FEET OF THE SITE
GRAB TENSILE STRENGTH CASTM D4751 200 PS MIN.
GRAB TENSILE ELONGATION ASTM D4632 301G MAX.
MULLEN BURST STRENGTH ASTM D3786-80A 400 PS MIN.
A05 ASTM D4751 20-45 U.S. STANDARD SIEVE SIZE
2. DESIGN AND INSTALLATION SPECIFICATIONS
2.1. HOG FUEL (WOOD BASED MULCH) MAY BE SUBSTITUTED FOR OR COMBINED WITH QUARRY SPALLS IN
AREAS THAT WILL NOT BE USED FOR PERMANENT ROADS. HOG FUEL IS NOT RECOMMENDED FOR
ENTRANCE STABILIZATION IN URBAN AREAS. THE INSPECTOR MAY AT ANY TIME REQUIRE THE USE OF
QUARRY SPALLS IF THE HOG FUEL IS NOT PREVENTING SEDIMENT FROM BONG TRACKED ONTO
PAVEMENT OR IF THE HOG FUEL IS BEING CARRIED ONTO THE PAVEMENT.
2.2. FENONG SHALL BE INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TOT HE CONSTRUCTION ENTRANCE.
2.3. WHENEVER POSSIBLE, THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM, COMPACTED SUBGRADE
TI-IIS CAN SUBSTANTIALLY INCREASE THE EFFECTIVENESS OF THE PAD AND REDUCE THE NEED FOR
MAINTENANCE.
3. MAINTENANCE STANDARDS
3.1. QUARRY SPALLS SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE
SPECIFICATIONS.
3.2. IF THE ENTRANCE IS NOT PREVENTING SEDIMENT BEING TRACKED ONTO PAVEMENT, THEN ALTERNATIVE
MEASURES TO KEEP THE STREETS FREE OF SEDIMENT SHALL BE USED. THIS MAY INCLUDE STREET
SWEEPING. AN INCREASE IN THE DIMENSIONS OF THE ENTRANCE, OR THE INSTALLATION OF THE WHEEL
WASH. IF WASHING IS USED, IT SHALL BE DONE ON AN AREA COVERED WITH CRUSHED ROCK, AND
WASHED WATER SHALL DRAIN TO A SEDIMENT TRAP OR POND.
3.3. ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING. THE
SEDIMENT COLLECTED BY SWEEPEING SHALL BE REMOVED OR STABILIZED ON SITE. THE PAVEMENT
SHALL NO BE CLEANED BY WASHING DOWN THE STREET, EXCEPT WHEN SWEEPING 15 INEFFECTIVE AND
THERE IS A THREAT TO PUBLIC SAFETY. IF IT IS NECESSARY TO WASH THE STREETS, A SMALL SUMP
MUST BE CONDUCTED. THE SEDIMENT WOULD THEN BE WASHED INTO THE SUMP WHERE IT CAN BE
CONTROLLED AND DISCHARGED APPROPRIATELY.
3.4. ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD AND END LIP ON THE ROADWAY SHALL BE
REMOVED IMMEDIATELY.
3.5. IF VEHICLES ARE ENTERING OR EXITING THE SITE AT POINTS OTHER THAN >R=25*
UCTION
ENTRANCE(S), FENCING SHALL BE INSTALLED TO CONTROL TRAFFIC.C'pS�NG 1'OPD
MINA /l:z
oA r J73JB a �°
Nor tttte
�ar0r(AL
CLE.ARII
ARING EMITS LIMIT$
(SEE DETAIL 212 )
♦ LT' FENCE
I II
�I
I
I ICI
I II
11
'I
�o
SURVEY FLAGGING BALING WIRE DO NOT NAIL OR STAPLE
TII WIRE TO TREES
I
3' MIN
10 -20 ETAL FENCE
POST
12" MIN
I
NOTES:
1. CONOIT10N OF USE
1.1. TO ESTABLISH CLEARING LIMITS, STAKE OR WIRE FENCE MAY BE USED:
1.1.1. AT THE BOUNDARY OF CRITICAL AREAS, THEIR BUFFERS AND OTHER
AREAS REQUIRED TO BE LEFT UNCLEAR.
1.1.2. AS NECESSARY TO CONTROL THE VEHICLES TO AND ON THE SITE.
2 MAINTENANCE AND REQUIREMENTS
2.1. IF THE FENCE IS DAMAGED OR VISIBILITY REDUCED, IT SHALL BE
REPAIRED OR REPLACED IMMEDIATELY AND VISIBILITY RESTORED.
22. DISTURBANCE OF A CRITICAL AREA, CRITICAL BUFFER AREA, NATIVE
GROWTH RETENTION AREA, OR OTHER AREA REQUIRED TO BE LEFT
UNDISTURBED SHALL BE REPORTED TO THE CITY OF RENTON FOR
RESOLUTION.
2.3. THE CITY MAY REQUIRE MORE SUBSTANTIAL FENCING IF THE FENCE DOES
NOT PREVENT ENCROACHMENT INTO THOSE AREAS THAT ARE NOT TO BE
DISTURBED.
STAKE AND WIRE FENCE -STD. PLAN - 212.00
NOT TO SCALE
DRIVEWAYS SHALL BE PAVED TO THE EDGE OF R-O-W PRIOR TO
INSTALLATION OF THE CONSTRUCTION ENTRANCE TO AVOID
DAMAGING OF THE ROADWAY
IT IS RECOMMENDED THAT THE ENTRANCE BE CROWMED SO THAT
RUNOFF DRAINS OFF THE PAD.
INSTALL DRIVEWAY CULVERT IF TERE-� \
IS A ROADSIDE DITCH PRESENT, AASILN
PER CITY ROAD STANDARDS
FeG6i a4�.�.0 4"-8" QUARRY AS
• * GEOTEXTLE { 15' MIN.
PROVIDE FULL WIDTH OF
A: T �o.A rrt 76RT ♦� �` 12" MIN. THICKNESS INGRESS /EGRESS AREA
Tt �
SIORAL` STABILIZED CONSTRUCTION ENTRANCE -STD. PLAN - 215.10
NOT TO SCALE
JOINTS IN FILTER FABRIC SHALL BE SPLICED
AT POSTS, USE STAPLES, WIRE RINGS, OR
EQUIVALENT TO ATTACH FABRIC TO POSTS.
2%2" BY 14 GAGE WIRE OR
EQUIVALENT, IF STANDARD
STRENGTH FABRIC USED
2' MIN
FILTER FABRIC
6' MAX
I
--MINIMUM /
12- MIN
IL JI
IL JI
4"x4'
TRENCH
BACKFILL
POST SPACING MAY BE
TRENCH WIN
INCREASED TO 8' IF WIRE
NATIVE SOIL
BACKING IS USED
2"x4" WOOD POSTS, STEEL
FENCE POSTS, REBAR, OR
EQUIVALENT
NOTES:
1. CONDITION OF USE
1.1. SILT FENCE MAY BE USED DOWNSLOPE OF ALL DISTURBED AREAS.
1.2. SILT FENCE IS NOT INTENDED TO TREAT CONCENTRATED FLOWS, NOR IS INTENDED
TO TREAT SUBSTANTIAL AMOUNTS OF OVERLAND FLOW. ANY CONCENTRATED FLOW
MUST BE CONVEYED THROUGH THE DRAINAGE SYSTEM TO A SEDIMENT TRAP OR
POND.
2. DESIGN AND INSTALLATION SPECIFICATIONS
2.1. THE GEOTEXTILE USED MUST MEET THE STANDARD LISTED BELOW. A COPY OF THE
MANUFACTURER'S FABRIC SPECIFICATIONS MUST BE AVAILABLE ON SITE.
AOS(ASTM 04751
JD-100 SEW SZE (0.50-0.15MM) FUR SLT FILM
5D-100 SIEVE SIZE (0.30-0.15MM) FOR OTHER FABRICS
WATER PflWIT"V ASTM D491
0.02 SEC" -MINIMUM
GRAB TENSILE s ASTM D4632
IBO Les MIN. FOR EXTRA STRENGTH FABRIC
100 LES MIN. FOR STANDARD STRENGTH FABRIC
GRAB TENSILE ELONGATION ASTI D4632
309 MAX
ULTRAVIOLET RESISTANCE ASTM D4355)
7OX MN.
3. MAINTENANCE STANDARDS
3.1. ANY DAMAGE SHALL BE REPAIRED IMMEDIATELY.
3.2 IF CONCENTRATE FLOWS ARE EVIDENT UPHILL FROM THE FENCE, THEY MUST BE
INTERCEPTED AND CONVEYED TO A SEDIMENT TRAP OR POND.
3.3. IT IS IMPORTANT TO CHECK THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE
FENCE CLOGGING AND ACTING AS A BARRIER TD FLOW AND THEN CAUSING
CHANAUZATON OF FLOWS PARALLEL TO THE FENCE IF THIS OCCURS, REPLACE
THE FENCE OR REMOVE THE TRAPPED SEDIMENT.
3.4. SEDIMENT MUST BE REMOVED WHEN SEDIMENT IS 6 INCHES HIGH.
3.5. IF THE FILTER FABRIC (GEOTE(TILE) HAS DETERIORATED DUE TO ULTRAVIOLET
BREAKDOWN, IT SHALL BE REPLACED.
SILT FENCE -STD. PLAN - 214.00
NOT TO SCALE
\ SILTS'
DRAINAGE GRATE
CRATE FRAME
SEDIMENT AND
DEBRIS
FILTER
WATER
DRAINAGE CRt.EMCE
^� RECTANGU
GRATE SHOW
BELOW INLET GRATE
• SECTION VIEW
�5" MAX.
I TRIM
OVERFLOW BYPASS
BELOW INLET ORATE DEVICE
RETRIEVAL SYSTEM (TYP)
OVERFLOW BYPASS (TYP)
ISOMETRIC VIEW
1. SIZE THE BELOW INLET GRATE DEVICE (BIGD) FOR THE
STORM WATER STRUCTURE IT WILL SERVICE
2. THE BIGO SHALL HAVE A BUILT-IN HIGH -FLOW RELIEF
SYSTEM (OVERFLOW BYPASS).
3. THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF THE
BIGD WITHOUT SPILLING THE COLLECTED MATERIAL.
4. PERFORM MAINTENANCE IN ACCORDANCE WITH
STANDARD SPECIFICATIONS B-01.3(15).
CATCH BASIN FILTER -STD. PLAN-216.3
NOT TO SCALE
UTILITY NOTE:
THE CONTRACTOR SILL CALL THE UTILITY LOCATION REOU67 GETTER
(ONE MI. CETERZ 1-900-424-5555) FOR FIELD Loaum OF Lmnes
THE CONTRACIOR SIMLL BE RET:PUNSIBLi FOR VERIFYING THE IDCITION,
D9ET90N. AND DEPTH OF ALL EXISTING UTILITIES WITHIN THE PROJECT.
WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOUIG THE UTUI95
AND SURVEYING THE: VERWX AND HOFrZONTAL LOCATION PRIOR TO
CONSTRUCTION. ALL POIETTNL UTILITY CONFLICTS S1NLL BE POTHOUED A
MINIMUM OF FIVE WORIONG DAIS N ADVANCE OF ANY PIPELINE TRENCH
EXCAVATION. THE UTILITIES SHOWN ON THE PLANS ARE BASED UPON
AVAILABLE INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS
DCTXR TIE CONTRACTOR SHALL CONSULT THE PR06JECT ENGINEER TO
RESOLVE THE PROBLEM PRIOR M PROCEEDING NTTH CONSTRUCTION,
50 25 0 50' 100'
1-=50'
PRELIMINARY CITY OF LAKE WASHINGTON BLVD NORTH 7/20/1D
Pa -� R EN TON STORM WATER AND WATER MAIN
Gvft3r 8cO.bLowne, Inc, NOT FOR "! C.rIL -
—
CONSULTINGENGINEIERS CONSTRUCTION ' SAG "� DATUM Planning/Building/Public Works Dept IMPROVEMENTS TEsct
, NO. REVISION BY DATE APPR � PR �x TEMPORARY EROSION CONTROL DETAILS 3 P 11
SECTION 32, TWP 24 N, R 5 E, W.M.
EROSION CONTROL NOTES 2010
1. THESE NOTES SHALL APPEAR FOR ALL PROJECTS - SITE IMPROVEMENTS, SURFACE WATER
UTUTY, WASTERWATER UTILITY, WATER UTILITY, AND TRANSPORTATION.
2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION
MEETING MUST BE HELD WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER.
3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF VEGETATION PRESERVATION AS
PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING IN
THE FIELD PRIOR TO CONSTRUCTION IN ACCORDANCE WITH APPENDIX D OF THE SURFACE
WATER DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION. DURING THE CONSTRUCTION
PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE
CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE
DURATION OF CONSTRUCTION.
4. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF
CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL
MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE
REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK OUT TO ROAD
RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT.
5. ALL REQUIRED SEDIMEN TA IT ON CONTROL FACILITIES MUST BE CONSTRUCTED AND IN
OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION
OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL
EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION
UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR
ON -SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND
ADDITIONS TO EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY
OF THE PERMITEE.
6, THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE
INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS
CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEA50NAL CONDITIONS DICTATE, THE
PERMITEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES
WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE.
DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY
OF THE PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE
ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM
REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER
WAUTY OF THE RECEIVING DRAINAGE SYSTEM.
7. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT
CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES,
RESTRICTORS, CHANELS, OR RETENTION FACILITIES.
8. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE
DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH MARCH 30TH)
OR SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST THROUGH SEPTEMBER 30TH) SHALL
BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING,
MULCHING, PLASTIC COVERING, ETC.).
9. WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL
CONSTRUCTIONS SITES CLEARING BETWEEN OCTOBER ISH AND MARCH 30TH INCLUSIVE,
UNLESS OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS.
10. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX D OF THE SURFACE
WATER DESIGN MANUAL.
11, ANY AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE
ADDRESSED WTHIN SEVEN (7) DAYS.
12. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM
OF ONCE AN MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT.
13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE
WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED
PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER
INTO THE DOWNSTREAM SYSTEM.
14. DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH MARCH 30TH, ALL PROJECT
DISTRIBUTED SOIL AREAS GREATER, THAT ARE TO BE LEFT UN -WORKED FOR MORE THAN 12
HOURS, SHALL BE COVERED BY MULCH, SODDING OR PLASTIC COVERING.
15. ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN
SHALL BE MODIFIED WTH THE NECESSARY EROSION CONTROL MEASURES AND SHALL
PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACUTY IS TO FUNCTION
ULTIMATELY AS AN INFILTRATION SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH
GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL
GRADE OF THE PERMANENT FACILITY.
16. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED AREAS
SHALL BE REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE
WINTER RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING
OF THE WET SEASON. A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS
TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY OF RENTON FOR RENEW.
p, ANN
�FQ@Yo, r•aeje'1,f�? �FF'�pr •ue Cl
a
4
�gC.4P'rzsoP�<<Ixrs`4u =6°'
sflONAL �O NAl CWG
EROSION AND SEDIMENT CONTROL RECOMMENDED CONSTRUCTION SEQUENCE
1. PRE -CONSTRUCTION MEETING.
2. POST SIGN WITH NAME AND PHONE NUMBER OF ESC SUPERVISOR (MAY BE CONSOLIDATED WITH THE
REQUIRED NOTICE OF CONSTRUCTION SIGN).
3. FLAG OR FENCE CLEARING LIMITS.
4. INSTALL CATCH BASIN PROTECTION IF REQUIRED.
5. GRADE AND INSTALL CONSTRUCTION ENTRANCE(S).
6. INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.).
7. GRADE AND STABILIZE CONSTRUCTION ROADS.
8. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.)
SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT.
9. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH APPENDIX D OF THE SURFACE WATER
DESIGN MANUAL AND MANUFACTURER'S RECOMMENDATIONS.
10. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS
CHANGE THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH THE CITYS EROSION
AND SEDIMENT CONTROL STANDARDS.
11. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON
OR TWO DAYS DURING THE WET SEASON WTI STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING
OR EQUIVALENT.
12. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS.
13. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS.
14. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND BMPS REMOVED
IF APPROPRIATE.
UTILITY NOTE
THE CONTRACTOR SHALL CALL THE VOUtY LOCATION REQUEST CENTER
(ONE CALL CENTER; 1-500-424 5555) FOR NEID LOCAMN OF UTILITIES.
THE CONTRACTOR SHALL BE RESPONSIME FOR VERIMNG THE LOCATION.
DIMENSION. AND DEPTH OF ALL DWnNC URJ11ES WITHIN THE PROJE77.
WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOUNC THE UTILITIES
AND SURVEYING THE VERTICAL AND HORIZONTAL LOCATION PRIOR M
CONSTRLCRON. ALL POTENT14L UTILITY COIRUCTS SHALL BE POTHOLED A
MNIMUM OF FIVE WORIONG DAYS IN ADVANCE OF ANT PIPELINE TRENCH
EXCAVATION. THE URU7TS SHOWN ON THE PLANS ARE BASED UPON
AVAILABLE INFORMATION AND ARE SUBJECT TO VARIATION. IF COWUCTS
OCCUR THE CONTMCTOR 94AU CONSULT THE PRWMT ENGINEER TO
RESOLVE THE PROBLEM PRIOR TO PROCCEDINC WITH CONSTRUCTION.
PRELIMINARY t� CITY OF LAKE WASHINGTON BLVD NORTH 7/20/10
@B.P.B -� RENTON STORM WATER AND WATER MAIN
GI sy g OBbo�, �. NOT FOR '"` CJA. —I DATUM �L6
CONSL.TING ENGINEERS S.'C. �` Panning/Building/Public Works Dept IMPROVEMENTS TESC2
CONSTRUCTION NO. REVISION BY DATE APPR ��� TEMPORARY EROSION CONTROL NOTES
---- - _ - _-- --
N _ L
X - - - - - - - "- -? �u�u` G — G
- - - - -. _- _ - - G
—------- - - -
x — -- z _ --� G w G — G
CEMENT CONCRETE DRIVEWAY -ENTRANCE -
x- - - -__- _-�-' r __ - ' - - 13 - - - �----- _. ____ - -
_ - LAKE WASHIN' BL -G NORTH'S GLu
- unun POLE TO eE G F-
RELOCATED BY oTHE �- � I
.. -"1- -- _ 4. PJFIE
�-
�_. ES - _ _ OF WALK
.-� """ G TRACTOR TO POTHOLE FIBER —CONT7tACi0R�I0-- �-• �E1tlSTINC CB DSTEHAUI I W
�nn1F3t UTILLIl PRIOR COORDINATE W/PSE 21+00 TO BACK _
G.- - G REA1pVE AND WASTEHAUL _ _ 13 TO CO TRUCTION 20+00 _ ``�` i (n
NG Ham^ - CURB LINE 19+ _ - - 4-TYPE W
EXISTING WALL 2AN �
\� S CULVERT PROPOSED CU CB 3-TYPE 1, OPEN CURB FACE T T -^ Ill
T T _ _ " (n
' - - i r 1a+00 PER CDR STD P `
-
r 17+60 ~ r o c cum
18 LFt 12' CP
r
�r -_ _ - - +-fit-- -
N
-CNI
- -
.r Q
I -DF.-WAY -
r-
�^.. _ -- _ --_-- - _
-• I
SIDEYt9LK_ USEMEILT-L NE _ _ - _ - . - f - - - - - _ _ --1 W
PROPOSED PERV1W5151DEWAtJC t _ _ -1 _ - ROUTE 18" EP
Z
CF . GLOW J
- - IV
V
"�t
1-TYPE-2-. - - 2 2 // / (LE.-26.69) 1 7 -
j - - 28 -TYPE 2, 72'f W/SOLID LID
/ $ I (FLOW SPUTTER)
_S-o.O_OIFT/FT
*� 27
12 LFt 12* CPEP /
�j 9 I ROUTE 12` CPEP STORM STUB TO EXISTING
3 �
- HOW ELEVATION OF DITCH (1Er25.02) AFTER
?' wNiNT"AT
'y
-_-- _--�0SW�r�q§'j,�F1.7T IJNE STA. 16+ 60' FIT THE BACK OF THE WALK IS CONSTRUCTED
T - - --_--- STA 17+39 61' R 1 I.E.-26.29 /DEBRIS BARRIER N
t GRAVEL ACCESSLF-26 19 W/DEBRI BARRIER (SEE DET CDR STD PLAN 223.00)
WITH CONCRETE ACCESS PAD' PROPOSED BIO-S 4
1 2 REMOVE AND WASTEHAUL
STA. 17+17r 72" FIT 9 '20 LF OF EXISTING 12" DRAIN PIPE. 13 1
I.E.-27.57 1 �- OAYUGHTIXISTINC 12' MAIN INTO NEW BIOSW
i
NEW ENTRANCE INTO THE BIOSWALE
0_:................ .....: ...................:. .........' ...........:.... .... ...... ........ ._.. _... ..... ..... ....... ......... . ...... ........ .......... 0
... i... i........................ - .............. ...................................................... ...... .. ... ...... ................... ..... .... ....... ................... ... J
PROP05>=D �GUR
i A
5
0.:.. d... .............................. .................. ..... ................... :... ..........
775 lF# 24 CPEP��
5=0.000
LFt 24' CPEP 92 LFf 24' CPEP
0.0001 � i S=0.0002
25
�i
-----
5.. .................................:.:.... .....................:.........................:............... 12'.A1sL. z.1� o�Yrmae...- .-....-....:-..---.-.-- -
20'0
_ _ ..... .. .
...................:..................:.................:.................. ................... .............. .:...:...:..
0
o.:.
... . -i.
16+00 17+00 0 18+00 19+00 20+00 21+ 0 2+ 0
r v_ 7Qo _ < _
Vs=Z'-� CD
CD ~ VvvZ v
W 3c `i„v
NVI ZW 'x p. 00 Z Eli ZI00yWji a N Z
�fL Oa Vd rR Waaa. W WW Z¢ W �� WW4as �C aWa
E5 I N V V
m- N N W
m N +N •F NN - N N N
W 11 f ! /1 N Nam.- ,u t�
17- Hnh _.�b0 WaO�[)NNNWN imp +wi tpO.2 +2 D
p I n NtnV N 166 F WA0 b nb OI fV� NT 10 iG Ar Nr)b 0
_ 1 - 111111 I-nnr�to r�r� I--r.lm I "rN NNN I nNN
ry mV~<1a WW WW N<�11 111 n��1 mH�414)41 WI ml-mWW
m H- W W W W W m 41
UNm___- VwE--
E� P. h! 4 ANN UTILITY m• Nom,
THE CONTRACTOR SHALL Cwt1 THE unuTY LOCATION REOIEST CENTER
me- +oF'� r.�',• (ORE CALL CENIER ALL RE az4PONS FOR REtn FYING THE
OF uraON.
y : TIE OION, AND
DEPTH
ff ALL
EXIS LNG FOR VERFTHIN THE LROMCT,
OWE71S1oN, AND OEPTH OF ALL EXISTING UTl1TIE'S WITHIN THE PROJECT.
WHETHER S140M ON THESE BANS OR NOT. BY PORIOIMG THE M UTIES
•CO '' , ` b �OA 'ANt 76AI `o ,r.� MO SONEYNG THE VER rAL AND HORIZONTAL LOCATION RWWR To
a��IOBE POTHOLED A
N OFCONSTRFFFIVE WOE DA. ALL POTENTIALYS Aaw a wrcOONFUCTS YPPELI E TFENCH
CSSJONAL o" �a'ONAL v 0CMIUON. THE LrrLM 5 SHORN ON THE RAMS ARE BASED UPON
LAW IR T CONTRACTOR
SHALL ARE SECT ,o VANaTIOL E EER 70IS D 3 5 3 1 0 5
OCCUR THE OOTRTIONDAR CONMT WO PROJECT EKA CON To
RESOLVE THE PROMEN PRIOR TO PROCEIIANG WITH OOSTR11CIWN.
PRELIMINARY 1'=20' 3 CITY OF LAKE WASHINGTON BLVD NORTH 7/2a/10
BP.B. REN TON STORM WATER AND WATER MAIN
C;7.7- ar III NOT FOR ` C J.K. i 1
CONSULTING ENGINEERS S.A.C. DATUM Planning/Building/Public Works Dept IMPROVEMENTS .� $
¢nvwuEIM a �r CONSTRUCTION �,�., STORM PLAN AND PROFILE SHEETS NO. REVISION �, ATE �� ,@ 5 '' 71
e P.B.
hs
'ONAL ORAL
CONSULTING ENG.INEERS
r
G
t
IFS
Lh
24+ 00
Lu
Lu
- - - - - - - - - - - -
V)
A,
LLI
LLJ
V)
O_114
I F:t 24" CPEP i1w
CD
+
LLI
z
REM011r,5 LF OF EASTING 24STORM PIPE.
PLUG ANQ ABANDON PER CITY STANDARDS. +
25+00
-TYPE 2
7-
.7-
C,
E.6G 24' S I'l
50
.......................................---------------- ...................
................ ................... ................... ................... ........................... ........
............ ...... .............
................... ................... .................... ........................... ........... .................. ..........
EXISTING G90UND AT
STORM ALIGNMENT
70 LF:k: 24" CPEP
S-0.000
45
..............................................
................ ... . .. .... ..... .... . ................ ...............
...... .... ................... ...................
..... .............
.......... ....... .............. ................... ........... ..................
40
...... ...... .......................... ........................
. /PROPOSEDi. CURS..uNe .................... ..... .......
........... ....
.......
.. .
... .... .... ... ........................................ ..................... ...........
35
. .......................................
............ ................ ................... ................... ................... .............
.
... ....
.... ... ........... ................... ....................................... ........... ... . . ...........
Ap
a; 52
30
................... ..............
. . . ....... ............... ............... ................... ...................
........... ....
------------ .........................
..
................... .............. .................... ................... .......
-IP!7 247 CPEP
53 LF± 24. CPEP
S 0.0001
5-0.0002
25
................. . .... ............
...... . ----- ---- - -- ----- ................... ----- .......... ................... ...............
........... .... .. ................... ............
-------- ---- --- ................... ................... ................... ................. ................ ........
20
............ .................... : ................... ------
. ............... ....................................... ............. ..... ...................
..............
............
.... ................... .....
............
...... ................... ............ ................... ................... ................... ............. ....
22
1-00
234-00
244-00
2-5i-00 26
................... ................... ...............................................................................................................................................................
..............
.... .................. ............
. . . . ............. . . .. .................................................................... .......... ...............
ZZ
(L
_H
Ina:
PRELIMINARY
CITY OF
_apa
NOT FOR
G.N.CONSTRUCTION
RENTON
SAC.
I 4r_,7_-
Plonning/Building/Public Works Dept
NO.
REVISION
BY
DATE
A.PPR
llm Nom, THE CONTRAMOR 5"1 CALL THE UrLrrY LOCATION RIEDUM CMER
(ONE COIL CENrM I-W4-5555) FOR FIELD LOCATION OF UTILRIES.
THE CONTRACTOR STALL BE RESPONS81 FOR VERIFYING THE LOCATION.
OlMEN%ON, NO DEFM OF ALL D=NG UIXME3 WnHIN THE PROA=,
WHETHER SHOWN ON THESE PLANS OR NOT. BY POT140LING THE UTILR
AND SURVEYING THE VERMCk AND MWON'TAL LOCATION PRIOR TO
CONTIRUCTION. ALL POTENW UnLrrY CONFL)m SHALL SE POTHOLED A
MINIALIN OF FIVE WORIONG DAYS IN ADVANCE OF ANY PPELINE TRENCH
D(CAVAr . THE LMLMES SHOWNON THE PUNS ARE BASED UPON
AVALASUE INFQFMTDN AND ARE suSiM m vAR%noK. F DONFLP=
OCCUR THE CONTRACTOR SHALL CONSULT THE PMECT 916ro1FFR TO
RESOLVE THE PROBLEM PRIOR TO PROCEEDW WITH CDNsTRvcnDm.
LAKE WASHINGTON BLVD NORTH L7129110
STORM WATER AND WATER MAIN
IMPROVEMENTS
SURFACE WATER STANDARD PLAN NOTES
1. THESE NOTES SHALL APPEAR ON PROJECTS FOR THE SURFACE WATER
UTIUTY.
2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A
PRE -CONSTRUCTION MEETING MUST BE HELD BETWEEN THE CITY OF
RENTON PLAN REVIEW SECTION AND THE APPLICANT.
3. ALL DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE
RENTON MUNICIPAL CODE (RMC), THE LATEST EDITION OF THE STANDARD
SPECIFICATIONS FOR THE ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION
PREPARED BY WSDOT AND THE AMERICAN PUBLIC WORKS ASSOCIATION
(APWA), AS AMENDED BY THE CITY OF RENTON PUBLIC WORKS
DEPARTMENT. IT SHALL BE THE SOLE RESPONSIBILITY OF THE APPLICANT
AND THE PROFESSIONAL CIVIL ENGINEER TO CORRECT ANY ERROR, OMISSION
OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THESE PLANS.
ALL CORRECTIONS SHALL BE AT NO ADDITIONAL COST TO THE CITY.
4. APPROVAL OF THIS ROAD. GRADING, PARKING AND DRAINAGE PLAN DOES
NOT CONSTITUTE AN APPROVAL OF ANY OTHER CONSTRUCTION (E.G.
DOMESTIC WATER CONVEYANCE, SEWER CONVEYANCE, GAS, ELECTRICAL
ETC.) THE SURFACE WATER DRAINAGE SYSTEM SHALL BE CONSTRUCTED
ACCORDING TO THE APPROVED PLANS, WHICH ARE ON FILE WITH THE CITY.
ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE WRITTEN
APPROVAL FROM THE CITY OF RENTON PUBLIC WORKS DEPARTMENT,
SURFACE WATER UTILITY SECTION.
5. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER
CONSTRUCTION IN IN PROGRESS.
5. GRADING ACTIVITIES (SITE ALTERATION) ARE LIMITED TO THE HOURS OF 7
A.M. TO 7 P.M. MONDAY THROUGH SATURDAY AND NO WORK ON SUNDAY
IS ALLOWED, UNLESS OTHERWISE APPROVED WITHA WRITEEN DECISION BY
THE CITY OF RENTON.
7. IT SHALL BE THE APPLICANTS/CONTRACTOR'S RESPONSIBILITY TO OBTAIN
ALL CONSTRUCTION EASEMENTS NECESSARY BEFORE INITIATING OFF -SITE
WORK. EASEMENTS REQUIRE CITY REVIEW AND APPROVAL PRIOR TO
CONSTRUCTION.
B. FRANCHISED UTILITIES OR OTHER INSTALLATIONS THAT ARE NOT SHOWN ON
THESE APPROVED PLANS SHALL NOT BE CONSTRUCTED UNLESS AN
APPROVED SET OF PLANS THAT MEET ALL REQUIREMENTS OF CHAPTER 4
OF THE SURFACE WATER DESIGN MANUAL ARE SUBMITTED TO THE CITY OF
RENTON.
9. DATUM SHALL BE NAVD 88 UNLESS OTHERWISE APPROVED BY THE CITY OF
RENTON. REFERENCE BENCHMARK AND ELEVATION ARE NOTED ON THE
PLANS.
10. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF
STORMWATER FACILITIES MUST BE SUBMITTED TO THE CITY FOR REVIEW AND
APPROVAL
11. ALL UTILITY TRENCHES AND ROADWAY SUBGRAOE SHALL BE BACKFILLED
AND COMPACTED TO 95 PERCENT DENSITY, STANDARD PROCTOR.
12. OPEN CUTTING OF EXISTING ROADWAYS FOR NON -FRANCHISED UTILITY OR
STORM DRAINAGE WORK IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED
BY THE CITY OF RENTON AND NOTED ON THESE APPROVED PLANS. ANY
OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH THE CITY OF RENTON
TRENCH RESTORATION STANDARDS.
13. ALL SEDIMENTATIDN/EROSION FACILITIES MUST BE IN OPERATION PRIOR TO
CLEARING AND BUILDING CONSTRUCTION, AND THEY MUST BE
SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETED AND THE
POTENTIAL FOR ON -SITE EROSION HAS PASSED.
14. ALL RETENTION/DETEN TION FACILITIES MUST BE INSTALLED AND IN
OPERATION PRIOR TO OR IN CONJUCTION WITH ALL CONSTRUCTION ACTIVITY
UNLESS OTHERWISE APPROVED BY THE PUBLIC WORKS DEPARTMENT,
SURFACE WATER UTILITY SECTION.
15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED
FOUNDATION IN ACCORDANCE WITH THE CURRENT STATE OF WASHINGTON
STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THIS
SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOMOR THE TOP
OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION
OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE 50 THAT THE ENTIRE
LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE,
UNYIELDING BASE ALL PIPE BEDDING SHALL BE APWA CLASS 'C', WITH
THE EXCEPTIO OF PVC PIPE.
16. STEEL_ PIPE SHALL BE ALUMINIZED, OR GALVANIZED WITH ASPHALT
TREATMENT /1 OR BETTER INSIDE AND OUTSIDE
17. ALL DRAINAGE STRUCTURES, SUCH AS CATCH BASINS AND MANHOLES
SHALL HAVE SOLID LOCKING LIDS. ALL DRAINAGE STRUCTURES ASSOCIATED
MATH A PERMANENT RETENTION/DETENTION FACILITY SHALL HAVE SOLID
LOCKING LIDS.
18. BUILDING AND OTHER STRUCTURES SHALL BE PLACED IN ACCORDANCE WITH
TABLE 4.1 EASEMENT WIDTHS AND BUILDING SETBACKS LINES.
19. ALL CATCH BASIN GRATES SHALL BE DEPRESSED 0.10 FEET BELOW
PAVEMENT LEVEL.
P. L )INN
•may r ct
P ♦ sTZIB 4p�0 mq of Will
ACSS20NAL .iaG\r rsslONAL
Cep 8t Oabr�, Imo.
-INSULTING ENGINEERS
TW ICx1il1 •vTM.e .vTx� IY
PRELIMINARY
NOT FOR
CONSTRUCTION
SECTION 32, TWP 24 N, R 5 E, W.M.
20. ALL DRIVEWAY CULVERTS LOCATED WITHIN CITY OF RENTON RIGHT-OF-WAY SHALL
BE OF SUFFICIENT LENGTH TO PROVIDE A MINIMUM 3:1 SLOPE FROM THE EDGE OF
THE DRIVEWAY TO THE BOTTOM OF THE DITCH. ROC( FOR EROSION PROTECTION OF
ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF SOUND QUARRY ROCK PLACED
TO A DEPTH OF ONE (1) FOOT AND MUST MEET THE FOLLOWING SPECIFICATIONS:
4-8 INCH ROCK / 40-70% PASSING;
2-4 INCH ROCK / 30-40% PASSING; AND
LESS THAN 2 INCH ROCK / 10-20% PASSING.
21. ALL BUILDING DOWNSPOUTS AND FOOTING DRAINS SHALL BE CONNECTED TO THE
STORM DRAINAGE SYSTEM, UNLESS APPROVED BY THE CITY PLAN REVIEWER OR
SURFACE WATER UTILITY SECTION. AN ACCURATELY DIMENSIONED, CERTIFIED
AS -BUILT DRAWING OF THIS DRAINAGE SYSTEM WILL BE SUBMITTED TO THE CITY
UPON COMPLETION.
22. DRAINAGE OUTLETS (STUB -OUTS) SHALL BE PROVIDED FOR EACH INDIVIDUAL LOT,
EXCEPT FOR THOSE LOTS APPROVED FOR INFILTRATION BY THE CITY. STUB -OUTS
SHALL CONFORM TO THE FOLLOWING:
A. EACH OUTLET SHALL BE SUITABLY LOCATED AT THE LOWEST ELEVATION ON
THE LOT, SO AS TO SERVICE ALL FUTURE ROOF DOWNSPOUTS AND FOOTING
DRAINS, DRIVEWAYS, YARD DRAINS, AND ANY OTHER SURFACE OR SUBSURFACE
DRAINS NECESSARY TO RENDER THE LOTS SUITABLE FOR THEIR INTENDED USE.
EACH OUTLET SHALL HAVE FREE -FLOWING, POSITIVE DRAINAGE TO AN
APPROVED STORMWATER CONVEYANCE SYSTEM OR TO AN APPROVED OUTTALL
LOCATION.
B. OUTLETS ON EACH LOT SHALL BE LOCATED WITH A FIVE -FOOT -HIGH, 2'x4'
STAKE MARKED 'STORM' OR 'DRAIN". THE STUB -OUT SHALL EXTEND ABOVE
SURFACE LEVEL., BE VISIBLE, AND BE SECURED TO THE STAKE.
C. PIPE MATERIAL SHALL CONFORM TO UNDERDRAIN SPECIFICATIONS DESCRIBED IN
CHAPTER 4 OF THE SURFACE WATER DESIGN MANUAL AND, IF NON-METALUC,
THE PIPE SHALL BE PLACED IN A TRENCH WITH A TRACING WIRE ABOVE OR
OTHER ACCEPTABLE DETECTION.
D. PRIVATE DRAINAGE EASEMENTS ARE REQUIRED FOR DRAINAGE SYSTEMS
DESIGNED TO CONVEY FLOWS THROUGH INDIVIDUAL LOTS.
E. THE APPLICANT/CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE
LOCATIONS OF ALL STUB -OUT CONVEYANCE LINES WITH RESPECT TO OTHER
UTILITIES (E.G. POWER, GAS, TELEPHONE, TELEVISION).
F. ALL INDIVIDUAL STUB -OUTS SHALL BE PRIVATELY OWNED AND MAINTAINED BY
THE LOT HOME OWNER.
G. STORM DRAINAGE PIPE SYSTEMS SHALL NOT PENETRATE BUILDING
FOUNDATIONS. EXCEPT FOR SUMP PUMP DISCHARGE LINES USED TO DRAIN
CRAWL SPACES. PROVIDED THE SUMP PUMP SYSTEM INCLUDES BACKFLOW
PREVENTION OR A CHECK VALVE-
23. ALL DISTURBED PERVIOUS AREAS (COMPACTED, GRADED, LANDSCAPED, ETC.) OF THE
DEVELOPMENT SITE MUST DEMONSTRATE ONE OF THE FOLLOWING: THE EXISTING
DUFF LAYER SHALL BE STAGED AND REDISTRIBUTED TO MAINTAIN THE MOISTURE
CAPACITY OF THE SOIL OR; AMENDED SOIL SHALL BE ADDED TO MAINTAIN THE
MOISTURE CAPACITY.
24. PROOF OF LIABILITY INSURANCE SHALL BE SUBMITTED TO THE CITY PRIOR TO
CONSTRUCTION PERMIT ISSUANCE
25. ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY OF RENTON
DOES NOT RELIEVE THE OWNER OF THE CONTINUING LEGAL OBUGA71ON AND/OR
LIABILITY CONNECTED WITH STORM SURFACE WATER DISPOSITION. FURTHER, THE CITY
OF RENTON DOES NOT ACCEPT ANY OBLIGATION FOR THE PROPER FUNCTIONING AND
MAINTENANCE OF THE SYTEM PROVIDED DURING CONSTRUCTION.
26. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARD,
SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, ANDANY OTHER NEEDED
ACTIONS TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO
PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK. ANY WORK
WITHIN THE TRAVELED RIGHT-OF-WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW
SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVED BY THE PUBLIC WORKS
DEPARTMENT, TRANSPORTATION SYSTEMS DIVISION. ALL SECTIONS OF THE NSDOT
STANDARD SPECIFICATIONS 1-07-23 TRAFFIC CONTROL SHALL APPLY.
27. PROJECT LOCATED WITHIN THE AQUIFER PROTECTION AREA (APA) SHALL COMPLY
WITH SPECIAL REQUIREMENT #6 OF THE SURFACE WATER DESIGN MANUAL AND
AQUIFER PROTECTION REGULATIONS (RMC 4-3-050).
STRUCTURAL NOTES
1. THESE PLANS ARE APPROVED FOR STANDARD ROAD AND DRAINAGE IMPROVEMENTS
ONLY. PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS, AND RETAINING WALLS
REQUIRE A SEPARATE REVIEW AND APPROVAL BY THE CITY PRIOR TO CONSTRUCTION
2. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION
CONTROL ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS.
ALL ROCKERIES IN CITY ROAD RIGHT-OF-WAY SHALL BE CONSTRUCTED IN ACCORDANCE
WITH CITY STANDARDS, ROCKERIES OUTSIDE OF ROAD RIGHT-DF-WAY SMALL BE
CONSTRUCTED IN ACCORDANCE MATH THE INTERNATIONAL BUILDING CODE.
NOTE:
1. This debris barrier is for use outside roadways on pipes 36" do. and smaller.
2. See drawing 223.10 for debns barriers on pipes projecting from driveways
roadway side slopes.
3. All steel parts must be galvanized and asphalt coated (Treatment 1 or bet
4. CPEP- smooth Interior pipe requires bolts to secure debris barner to pipe.
II�
PLAN
NTS
SIDE VIEW
NTS
ENTO
e.Ke.e 0
DRAIN
C a,�< twee eorror. view
eoN oo4n..o osTUL
Aj:
,Fl.. � ouaT osaove oeT.n
eAANc sernoH View Nores-,e,a..,.mm.,,�...r..< .
■ PL'BUC IrORKS STORM ROUND FRAME ANO COVER PLV7 W4.50
.',:I` ' DEPARr"a r
MARCH zoos
I_RnMPTRIC
IVIJ
motor smooth bars
rs to at y., .� fi mu 0W 1
least 2 corregatfons
of metal pipe (typlcal)
boB to LCPE pipe END VIEW
DEBRIS BARRIER STD. PLAN - 223.00
swum ,w �w.
'! CJJC
'�s.�c.
NO. REVISION BY DATE APPR o 0 0 ��
A. Rs
CITY OF
RENTON
Public Worts Dept.
NTS
Lynn NOTE:
THE CONTRACTOR SFIALL CALL THE UTILOY LOCH" REQUEST CENTER
(ONE CALL CENTETt 1-500-424-5555) FOR FIELD LOCATION OF UTILTIES.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATgN,
DIMENSION, AND DEPTH OF ALL EXIT U UT1ES WmaN THE PROJECT,
WHETHER SHOWN ON THESE PLANS OR NOT, BY PDTHOLINC THE UTILITIES
AND SURVEYING THE VERTICAL AND HORIZONTAL LOCATION PRIOR TO
CONSTRUCTION. ALL POTENrW_ UTIUTY CONFLICM SHALL BE POTHOLED A
WNINUM OF FIVE WORONG HAYS IN ADVANCE OF ANY PPEUNE TRENCH
EXCAVATION. THE UITUTIES SHOWN ON THE RANG ARE BASED UPON
AVAILABLE INFORMVI INFORMATION AND ARE SUBJECT TO VARIATION. F CONFLICTS
OCCUR THE CONTRACTOR SHALL CONSULT THE PROJECT ENGINEER TO
RESOLVE THE PROBLEM PRIOR TO PROCEEDING WITH CONSTRUCTION.
LAKE WASHINGTON BLVD NORTH
STORM WATER & WATER MAIN
IMPROVEMENTS 7
STORM NOTES AND DETAILS •a 7 P 15
11 � aAA.•EL aAaa�u wR
PrE RucE eEGDsw
vre GAT MY
r aAsw r�� vNWo wAre
xGLd .over
caAAaaavrtrtscrrno�il
9JVI IoP
M (TvwJ
mCPIG sRTl
za4� roe
rcc eFoonc
SECTION 32, TWP 24 N, R 5 E, W.M.
1. No sNq ar4 rapaed wlwr fMptl4 {wire
2. TM b.tbrn a M Sokol Bash m.r a roan b boWYly daeri9a.
3. THw r.cpnpria rr.,w and Scab ma, W kabla4 call e. tlrpa w w dprl
Tlw lath. m.y e. uM hb 1M aq.m.rladw�
4. Kno JOW sfr tvwe •.Y tlichrlaas al r maawan b 2S nwanaan. Preba
a 1.5' aaieam pap batwnn n» M Jkoul car an0 eia a4Wa d 9r pipe Ana
aw Sofia 4,, Sot a. A tlr 9aP wimkbi mww h amed.in wlh 9hnmrd
Spedgollo0 B-01.3.
CATCH BASIN DIMENSIONS
CATCH
yiALL RISE
M4KIMUM
MINIMUM BASE REINFORCING STEEL
7/fL
DINAETFR
1HICKt1ESS THICKNESS
sla
DISTANCE M IN EACH DIRECTION
BEfY/EF.H ....... .. __.-- .._-....._.....
I
KNOCKOUTS SEPARATE BASE INTEGRAL BASE
5{'
4x
S
4r
r 0.19
MIS
fig•
s
S
4e•
r 0.25
0.25
-
C
6P
lr 0.35
U1!._.....
--_.72---.____B
a4•
-_.
C
1r
___..-.___
TY
. ........_._..-.
1r 03]9
__. ..
0.29
96•
s
1 it
1 e4•
I Ir 0.39
0.29
PIPE ALLOWANCES
CATCH
arSIN
SCLJO PROFI
DIAMETER
COIICRE
METAL G'
PKe
PVG
se.
24-
j 30- 24-
27-
30-
54-
30'
36" 30'
27-
36-
60-
36-
42- 36-
M.
42-
72-
42•
54" 1 4e
36-
W.
96- 1 60- I 72- I 60- 35- 45•
�I (C(errugalad PdyethylStd.(r(n))a)) Storm S... Plea (Std. Spa.. 9-05.20)
(Sld. Spat 9-05.12(2))
CATCH BASIN TYPE 2 STD. PLAN • 201.00
TYP
1/2- MIN. 6
112 OPEMNG DPEMNG "EIGHT
p
TO 1" CLJL
HEIGHT 4• MIN
TOP OF GRATE
SEE NOTE 3
SAFETY BAR r DEBRIS GUARD
Us' MIN. CLAM STEEL ROD
SEE NOTE 2
29- MN.
1- MIN_ 20 1/4
Typ.
BEE NOTE 4
-� �P)
SEE NOTE
rP.l
;
1
HOLE OR SLOT FOR
N
ATTACHING HOOD (IN7'
TOP VIEW
FRAME DETAIL
OPEN CURB Ff
P. 6 4 ANN
w h
b
BOA fop 31iR � .irdAI �O� 14a 7ST11 `S
r■Ta� \ ta�,S rrt
SJDNAL 70NAL 6
DETAIL SECTION (D
CA707 BASIN
a Y
(p 0. )
FACE OF 3-
CURB RJ D.i57
taRAtE �
na 34" WIDE
CwJj TCHBASIN 1
{p 4W(WIDE ID
TCH BASIN TYPE 1
SEE NOTE 1
SECTION OA
1. The asymmetry of the Combination Inlet shall be consderea when
calculating the offset distance for the Ca671 basin. Sea SECTION A.
2. The dlmenslon s of the Frame and Hood may very Mighty among df-
ferent manufacturers. The Frame may have cast features Intended
to support a grate guard. Hood units shall mount outside of the
Frame. The methods for fastening the Safely Bar J Dells Guard Rod
to the Hood may vary. The Hood may Include casting lugs. The top
of the Hood may be Cast with a pattern.
3. Attach the Hood to the frame with two 3)4- a 2- hex head Oohs. nuts•
and oversize washers. The Washers shag have diameters adequate
FRAME to assure full bearing across the Woes.
4. When boll -down grates are specified In the contact, provide two
holes In the frame that are vertically aligned with the grate sots.
ac Tap eh hole to swept a 5/8" a • 11 NC • 2" alien head cap screw.
Location of bolt -down holes varies among different manufachurers.
See BOLT_ DOWN DETAIL. Standard Plan B30.10.
5. Drdy ductile Iron Vaned Grates shall be used. See Standard Plans
B-30.30 and &30AD for grate details. Refer to Standard Sp-&
Cation 9-05.15(2) for addi= requirements.
6. This plan is Intended to show the Installation details of a manufac-
tured product- It Is not Ill Intent of this plan to allow the sPsofk
details necessary to fabricate the castings shwwn on INS drawing.
CURB OR CURB AND GUTTER
MATCH TOP OF HOOD--
TO TOP OF CURB (TYP.)
HOOD
SAFETY BAR / DEBRIS GUARD
1 / 20' T 24- VANED GRATE
FRAM
ISOMETRIC VIEWFRAME- HOOD, AND VANED GRATE
K -0
-41 0 1�%,
�Vp6 AT r,Q.�q•
� rl
t(el
�N
4
6. OR 12-
I�
ONE. BAR HOOP FOR E HF.
TWO a3 BAR HOOPS FOR lr HEKiR
RECTANGULAR ADJUSTMENT SECTION
'✓t Svb�
/SFFN�a
f3 BAN EACH CORN
03 UAR EACH SIDE
TOP AND BOTTOM
ONE aS BAR
ACROSS BOTTOM
PRECAST BASE SECTION
on
TOP
PIPE ALLOWANCES
1. As acceptable attematives to the rebar shown In the PRECAST BASE
---
SECTION • fibers (placed according to 8w Standard Specifications), or
PIPE MA700A.
wire mesh having a minimum area of 0.12 square Inches par foot shall
-TER,
be used with the minimum required rebar shown In the ALTERNATIVE
...._ _._... _._..•.....lr ...
PRECAST BASE SECTION. Mire mesh shall rot be dared in tte
aorav®a
raAW u.Or[a
knockouts.
I
2. The knockout diameter shag not be greater than 18". Knockouts shall
w �� Pr[ is
have a wall thickness of 2" minimum to 2.5" madmum. Provide a 1.5-
minimum gap between the knockout wall and the outside of the pipe.
vss *
fsA xec 2.0 lr
Aflar [Ir3 pipe Is installed, fill the gap with Joint mortar In accordance
with Standard SpecliI 9-04.3.
mull rru five l>-
(sro. sPEd a-mla(1B
3. The marJmum depth from the finished grace to the lowest pipe invert
shag be S.
,emu mWA PVC
(sm. Yee ►4s1al271 r>-
4. The frame and grate may be Installed with the flange up or down. The
srw awlel� ux
tram may be Cast Into the adjustment section.
5. The Precast Base Section may have a rounded floor, and the wags rosy
be sloped at a rate of 124 or steeper.
6. The opening shag be measured at the by of the precast base section.
7. All pickup holes shall be grouted full after the inlet has been placed.
a3 BAR EACH CORNER
is MIN
N BAR HOOP
SEE NOTE 1
ALTERNATE PRECAST BASE SECTION
CONCRETE INLET STD. PLAN - 200.30 g
A
SECTION
ISOMETRIC
1. Wtwn boa4 prates are apadSed hew CP*00L PR4b Ee twp rb
Inaw prate that - vertically snplyd rah the loin In Sw kar-
Location of ballEown sbN vsan amwkT dWWwa mwatsmaws.
2 Re. b SU-I Spadliuton 9-05.15(2) for ad/Swul repawnxls
3. Urirn .locales aperJeed. ranee Scats. stall be used wen sbWra
fame In M Bad w". puew w shwldw. Vwud gree > r not W
locaNtl whin wessr , U. vane a- by rYad waK
31 4a.
YE NOR1
BOLT -DOWN SLOT DETAIL
RECTANGULAR VANED GRATE STD. PLAN - 204.20 r
THRY NOTE,
E CONTRACTOR SHALL CAL THE UTILITY LOCATION REQUEST CENTER
(ME CALL CENTER; 1-a00-424-5555) FOR FIELD LAGTIUN OF UTTLITIM
THE CONTRACTOR SRAL BE RESPONSIBLE FOR VERIFYING THE LOCATION,
DIMENSION. AM DEPTH OF ALL DUSTING UITURES WITHIN THE PROJECT.
WHETHER SHOWN ON D16E PLANS OR NOT Er PORNOUNG THE UTILITIES
AND SUINFTNG HE TVERTICAL AND HORIZONTAL LOOMIOI PRIOR TO
CONS"Kcn0fc ALL POTENTIAL UTILITY CONFUCLS SITAR BE POTHOLED A
MOO" OF FIVE WOMRIC DAYS N ADVANCE OF ANY PIPELINE TA04CH
ESCAVATION. THE UTILITIES SHOWN ON 11E PLANS ARE BASED UPON
JAMIU MIE I FORMIMI N AND ARE SUBIECT TO VAfaAT101L IF CON UJCTS
OCCUR THE CONTRACTOR STMLL CONSULT THE PRCUIE.TT ENGINEER TO
RESOLVE THE PROBLEM PRIOR TO PROCEEDING WITH CONSTRUCTION.
...a. rr =M1 ,AA. CITY OF LAKE WASHINGTON BLVD NORTH 7/20/10
PRELIMINARY 9.P8 -„
C,3L,sy O•bo)L�e, I� NOT FOR onnM RENTON STORM WATER & WATER MAIN
�` cr.Ic � a
A4 Public works DcVL IMPROVEMENTS 8
m CeormrDF611LTING ENGINEERS S
.war H3RTv r.rrt >m CONSTRUCTION NO. REVISION BY DATE APPR �'®"" STORM NOTES AND DETAILS
aTATnJ, vARbLTDr ,.., ®b a-eess gird.
P. (ANN
ONAL Sa�OflAL
SECTION 32, TWP 24 N, R 5 E, W.M.
30'x36' ACCESS
HATCH E
BAFFLE WALL ((��
EL-28.62
I
I I / `111
BYPASS PIPE
24 CPEP T � "� I i �••�
42*
/
40'
i INLET PIPE
-- 24' CPEP
LEE-26.62
72"0 PRECAST MH
1- (POLY) SAFETY TYPE
MANHOLE STEPS
LOCATED AT 12" O.C.
48
SHEAR GATE W/CONTROL
ROD FOR CLEANOUT
w N FLOW RESTRICTOR/SEPARATOR
a aD
w
H V N
Z N l+i
A
FLOW SPLITTER MANHOLE
NOT TO SCALE 3
M1H Ig,
AO 0
" MIN.
GRADE TO DRAIN (TYP.)
SEPERA71ON GEOTEXTILE TO BE
\ MINCED UNDER ROCK (SEE NOTE 1).
3' MINUS ROCK
- 25.0', TYP.
!i
1. tEOTE)MLE SHALL MEET THE FOU.00ING STANDARDS
OIL18 TENSILE 57IIENGTH (ASTM D4751) 2Do PSI MK
GRAB 1F7/9.E SIREIIGTH (ASIM D4832) 3OZ MAX
MlAIEN BURST MREHGIH (ASN D3786-8Dv) 400 PS MK
AOS (ASTM D4751) 20-45 (U.S. STANDARD SIEVE SIZE)
GRAVEL ACCESS PAD (a1
NOT TO SCALE TYP
RIM EL 33.05
FLOW RESTRICTOR/SEPERATDR 12"t
v
PIPE SUPPORTS}
SEE NOTE 3
OUTLET PIPE
12" CPEP
TO BIOSWALE
I.E.=27.79
24" CPEP
I.E-26.62
1.0' SECTION OF PIPE —
ATTACHED BY GASKETED
BAND TO ALLOW IT TO BE
REMOVED.
RESTRICTOR PLATE
NTH 3' DIA.
ORIFICE AT
EL-25.79
D
18" DIA
2 DOOR HATCH
30'x36' BY EAST
JORDAN IRON WORKS
OR APPROVED EQUAL
I
C... .
7Z'O PRECAST MH
D
I.E.=30.00
SHEAR GATE W/CONTROL
ROD FOR CLEANOUT
BAFFLE WALL
EL 28.62
D
2,-0" MIN
-T
2'-C' MIN-T
p"
1
2'-0' MIN p
it
SECTION e
N0T TO SCALE
24' CPEP
I.E.=26.62
T.O.S. EL=23.79
NOTES:
1. THE RESTRICTOR/SEPARATOR SHALL BE FABRICATED FROM .60"
ALUMINUM OR .064' ALUMINIZED STEEL OR .064" GALVANIZED STEEL
PIPE IN ACCORDANCE WITH AASHTO M 36. M196 AND M274. GALVANIZED
STEEL SHALL HAVE ASPHALT TREATMENT 1.
2. OUTLET SHALL BE CONNECTED TO STORM DRAIN PIPE WITH A COUPLING
BAND.
3. PROVIDE AT LEAST ONE 3'xO.D90' SUPPORT BRACKET ANCHORED TO
CONCRETE WALL (MAXIMUM 3'-0' VERTICAL SPACING.)
4. FRAME AND LADDER OR STEPS SHALL BE OFFSET SO THAT (1)
CLEANOUT GATE IS VISIBLE FROM TOP. (2) CUMB-DOWN SPACE IS CLEAR
OF RISER AND CLEANOUT GATE (3) FRAME IS CLEAR OF CURB,
5. CLEANOUT GAPE/SHEAR GATE:
ALUMINUM ALLOY PER ASTM 826-ZG32A OR CAST IRON ASTIR A45
CLASS 30B AS REQUIRED. LIFT HANDLE EITHER SOLID OR TUBING
WITH ADJUSTABLE HOOK AS REQUIRED. NEOPRENE RUBBER GASKETS
REQUIRED BETWEEN FLANGES.
6. METAL PARTS: CORROSION RESISTANT ALUMINUM. IF STEEL SUBSTITUTED
FOR ALUMINMUM, GALVANIZED PARTS NEED TO HAVE ASPHALT
TREATMENT 1.
PRELIMINARY a CITY OF LAKE WASHINGTON BLVD NORTH 7/20/10
C'-�y 8tc)ebo.' I..' NOT FOR ^ �,x {���� ��M -� RENTON STORM WATER MEATS WATER MAIN � A
CONSULTING ENGINEERS SAC oA ' Public Works Dept. IMPROVE�p p J
m�.vwx,a CONSTRUCTION
NO. REVISION +Erl.. APPR
er.e. 9 ' 15
i m Wm m
m
O >01�OW 1aK mN OW CW 03 NgJOJ 0 J Lrt.m NOTE,
O W o v RiU O IO + + + + _ < + _ < TOE CONTRACTORSF1ALL CALL THE llflfTY LOCATION RFAUEST CETITF7t
++S n nj in O n
W U - ap C7 W ' • W (�CONTT A_ SHALL BE `Z DEPTH Of ALL _ VE»'MC THE LOCAM.
WHETHER SHOWN THESE MANS OR �POTHOLMO THE VrLMES
to —N Un yt N rn N N' AND SUTNETING THE VERTICAL AND HORZONrAL LOOMM PRIOR TO
CONSTRUCRON. ALL POIEKTVIL UQJTY CDNFlJCIS SHALL BE POTHOLED A
MMMM OF FNE NONQM. DAYS N ADVANCE OF ANY PIPEIIE TRENCH
P. ppANN E)CAVATION. THE Ur%JRFS SHOWN ON THE PLANS ARE BASED UPON
AVA4ABE NFDRMAION AND ARE SUBJECT TO VAFtKnoN. i CONFLICTS
OCCUR THE CONTRACTOR SORT CONSULT THE PROJECT GNEERUCTO TO!J7 `�`♦ s�� OjFe'' ♦^ RESOLVE THE P'fNBZI/ PNIDR TOPI1OCEmIHINO WFIH CONSTRUCTION.
'p0 ♦ 373A o �Ma ?+ ♦ ]6311 pra
'"�. '�,. ra•`�O� O AQJ.* •` ti 20' 10' O 20' 40'
sSRONAL 6� d�.ONAL 20' — 3 S 31 10
PRELIMINARY �- CITY OF LAKE WASHINGTON BLVD NORTH 1/20/10
BP.& -� RENTON STORM WATER AND WATER MAIN
L`:re�B�Q�ba�ne,jTon NOT FOR IMPROVEMENTS —R10
i Planning/Buildirtg/Public Works Dept
.tea . Ee"GENERE� m CONSTRUCTION —S''D' WATER MAIN PLAN AND PROFILE SHEETS
REVISION - BY *DIAT.EA.PPR '� 10 " 1 1
BP.B
N
CY
Q
CA
C
9
fa
S
m
J
GO
LI
m
0
z
O
Z
SECTION 32, TWP 24 N, R 5 E, W.M.
X
RESTRAINED 12' WELDED STEEL
P
PIPE IN E1gST1NC 18- CASING
PinFlrn_Ncc
1 '
X
X
X
X-
_ ---- --- -
-
- STA I7+62, 7 RT
._. -
-
--
-
x-
--12-'GV. �MJAYJ) - -
- -
_
_ __
------
G
- - W/MEGALUG -
- _ _. -
- - _— �- --
�-------
'LT
X
X
-
- - - -.. _ - - -
Ol i C
---_- �-_ -�_� ---- _
T=
--'G - -
4 w
G r(wF-
- - _..
r.— GG 0 — G
W
- - ��_-----
_ -,------ --_., 52'� 4_5'9END -MJ- -' - _ ".._---._---.- _ __.
- -
G C
^ —� ..ui
}
. -- -
-•�-, -= - - - - I W/MEGALUG AND TB ---'^'~ r- - -. - - - - - - -
- -- - 0 �� �-
- -- _ BLVD
UJI- _ -- — G
-_ -
�- - UnLITY POLE TOBESTA
G ~�2�x6 MJ'�)W RELOCATED BY
s OTHERS. CONTRACTOR
ASSEMBLY, TCOORDINATE.—
7 "-�G �_
20+55, 11' RT
12' TEE, (FLxFL) W/TB 6 - G
s-1 c�L-(F3�lAd)�
21 +oo
_
y
W
W __- --- _ _ _ o - c G _— LAKE WASHINGTON
- ,.....
I_
1 FlRE HYDRANT 20+00
27
-
_ --
.... - --
= Y G \ .:-�-..
r 19+00
Lu - _ 4 �; `STA 7743. 18' RT ',
AJL B102 -
D -
12'
O
N STAr17+13, 18'rRT T 12- 45' BEND MJ _ 18+00 CUI� LINE 12� DI CL 52
_.STA 16+Q3 17' RT 12' TES (Fl�E'L)-14/ - W/MEGALUC D TB _ PR O
': • '. 3-GV, ' 111 - -
T i =-r
—" f �_.. - -- -
--'_
-~ T _ "- - ."
N
�~
— - - -Tk =��T�
'i -`
T
N
45- VER . BEN r - •'.• . (FLWO 17. A -
(MJzM.� W/MEGALUC -f ,. .'r
r T .. ,�,
- _— --� — _ __ —
_. _ ___ —
.___
>_� _ _ _
_ - _ o
_ _ �-
N
p IE00 A T8- T r
p .STA 16+94. 18' RT . � r '���.--_--- -- ---- _-_
�8-- ST� r 12' 45' VERT. BEND, _ -'^, �� _ _- —�' _ `-�
:. CASINC PIPE AJd W/ME6,LUC ANDLu
r
�_
-- -- -- CLEAwnc uMrtS -
-
—_ - 1
-- - 6 � _ ---
~"I -
_ _ _ - _ _ _- ____ _ -
- - -- - _
I I - _ _ — - _
-
F.'
V)
I I
-
�� 171
err
- "\ 4" q' _ I I I { � __ I --- -- --
t24 '__,
%•
_
SIDEWALK EASEMENT• NE'
-
_
--
--
' /J -
-
_ 3
- -_ -
W r' �� -- STA 17+06 18 R7 yyi..7'_I
� --- -_ - ___ I
- - -- 4"
C'.. -STA 20+57, 46' RT� I
--
Z _ i 12' 45' VERTU BEND. �---- :- _.�_
r~ T' /MEGALLG AND TB .) _ _ - - - STTEA7f35ri8"�i�^=- 29 28
..
G AP, (MIJ,)
f
_
/
STA
J 16+14y 17' RT .,, { ., _ .. _ MJ _ S I
_ 1 45' VERT.• END,' DETAIL - - -- _&:- L(MJITFL�' 6 I
(MJxMJ /MEIG UG _ FOR PIPE,.. -'-FIRE HYDRANT ASS'Y, (25-RT)
j RESTRAINTS I PER STANDARD DETAIL B102 I
-
Al.ND TB
i--'-'J-7i
_
-
9`627I '-- I
-/'--� 1 Q1)
CITYNOR TO CONSTRUCT CURB
` 3--- I
DONL
OE
NORTH OF THIS LOCATION. DOES
/ %
--_.-.- ------ ----------
------------ BIOSWALE EASEMENT LINE
- - -STA 17+14. 39' RT
12-END CAP, (MJ)
FsP
NOT INCLUDE SIDEWALK OR
LANDSCAPING.
/ /•/
/
r Hm 1' W/2- BLOWI7,FF ASSEMBLY' AND TS
Z
!(
p � IFAPoNC LIMITS
O. H3
z
W
40 .............. ..... ... ...._ ....... ...._.. ...._ .....
.. � ...... ... .. ... ......... ... ...
.. ... �'
... ...
.... .. .............................. C.
4
......................_...__...............................------.--- .:.......
:. TZ'. WELDED: STEEL: WATER MAIN ... :.. ... :.. ....... ..........
:.
�.
.... o
W/ IN-rERIOR/EXTERIOR COATING
g PER AWWA C213-01
STING 16' _ -
v �:
p
XISIING i STEEL CASING
�. :�.. .. i .... .: SIDEWALK 'PIPE. :.;. ' :. ::-
35. ...... ............ ............
-
OSE�.LURB..
z _
�W
_ -0 -
-3
d
a_
<
/
30 ...... .... ................... .... ............: �...: . - ..................... ...................... ...... ..................................
... .............
_........:. ............
..... ...... ..... .._. :.
3
. ... - . i 4- MINIMUM COVER. ' 1 24'. CPEP STORM PIP
.. ..
.
12- DI CL 52 W/POLYWRAP
20:...:............:......................... ......................:... .......... .............................. .. .. ........... ....... ------
.. .. ......
_
2
-
—J15
16+0 3 # 17 oo— ; ; 18+00 19+00
N
20+00
N
21+00 22+0
W Z
� JJ O O
W W W W ; m
M
3
x OO
m m m O m J N N
�Fr Fr
O_ N0 N
} +> U + + + + + +
m h min < VO n in n W r n in n in n j
^ + Y Y w
< Z <s <a <: <. < <
~
a
< N
4
+
O
<.
UnLITY NOTE
THE CONiIiWCiGR SRNLL CJ1LL THE UMT LOCATION taWllESf CORER
R 11121D LOCATM OF UTILITIES.
THE CONTMCIOR SHALL BE RESPORSIKE MR VERIFYING THE LOCATION,
F N N H-N O ON O N ON ON H-N O N
fn .- N ^ U ? N ^ N ^ N ^ N ^ N ^ N
H-N
Hry
DWERSION. NO OEP1H OF ALL E)QSTING UnUr'o WITHIN THE PROJECT.
WHETHER SHOWN ON THESE PLANS OR NOT. BY POTHOLING THE UTLITIES
P. B .� AJVIV C
° 1c
AND SURVEYING THE VERTICTL AND HOWZONTIL LOCATION PRIOR ro
CQbTRAICTON. ALL POTENTLAL UTRTY CONFLICTS SMALL BE POTHOLED A
MMMUN OF FNE WOROONG DAYS IN ADVANCE OF ANY PIPEIRE TRENCH
UPON
�MTTHE CO NACT � SUHOWN �BEC'T HE PR ATKRTHE PLANS ARE �i CER To 5
OCCUR THE CONTRACTOR NOR CONSIST THE PROJECT Cf ETWCNEOt ro
RTsavE THE PROdEL PRIOR ro PROCEEDING WITH CONSTRVCfg11.
'Q a
Oq �� 3rJX
°r
20' 10' 0 20' 40'
rr,� ♦ r +n t� ♦
�S10NAL VONAL
1' = 20' D 1315131
(3iIs7$L
PRELIMINARY
NOT FOR
+
xnM
A RITY O
LAKE WASTORM HINGTONTER AND BLVDWATNORTH
7/20/10
Bpi
'� cr.IL
°�swG.
cDnwLrinG ETCIAIN
EERS
Hum CONSULTINGrEERs
ENGI R,Tc Hm
CONSTRUCTION
Planning/Building/Public Works Dept
WATER
IMPROVEMENTS
MAIN PLAN AND PROFILE SHEETS
B.P IL
vrnA. r.PW W.a swn Wsal H'1.i1
NO.
REVISION
BY
DATE
APPR
07
EXISTING 12' DI yfKT�RMAl 24 _ .._ .�`�- STA 24+75, & RT
RCP. CONTF* OR SHALL P bLE TO - - I
VERIFYytVMT AND D REMOVE i _ �'� r - -- 12` TEE. (FL 'L) w/1B
S G 24` RCP N�DR l G — — 'i — — - I � 3-12' GV. (FUMJ)` 10
NECTION TTL�EX+STIRC WA - -
_ 8 _"SiA 0+56, 16' RT = 24+00
N _ 12 4SVERT. BEND =lam - STA 24+14, 14'. b- --
/ l2+49'TS.. RT 6 (M1 wi38--- "� - - _ 121..22 7i' BEHO. MJ) w/TB
W _ cRoss (Flx�i). w/Tra _ _+66`—
LLI _3-12- GV, ( � —' rr — — _ = PROPOSED CURB I l
W Ruwc
W 12, 52
N
i
cm
N�� `
N - TA 22+40`-45RT• x r�y� , r. r ` f - ` - -
\12
MJ)CLEARING LIMITS -
tA
_ STA 22+74, 16' RT
W
- rt
g 6 C;V TEE (MJxFL) WITH _ - -
1 0
W
Q
N,
-DO A
- l
' l-
I
I -TA 25+35,
I 12' VERT. POLLYPIGGING _
_-
I STATION
1 PER STANDARD DETAL B114 -
�- STA 24 `Er RT
/ I-'--..12`x6" TEE ) W/TH 10
....
I v-sv. (F'hdlJ) 6
1-FIRE HYDRANT A BLY
1-_ 1- (25+11,'•47', RT)
Jam` PER STANDARD ULI 151
STA 24 l% 53' RT
12"W (MJ).,W/BLOWOFF
SSEME1LY AND.. TB
5
SECTION 32, TWP 24 N, R 5 E, W.M.
12'
SECTION
3/8"x 1-1/2"—
CONTRACTiON JOINT
O 15' O.C.
CURB AND
GUTTER. SEE
DETAIL 2.
SEE Pt
-
3/8"x6" EXPANSION JOINT ADJUST EXISTING
DRIVEWAY GRADE
3/8" X 13" EXPANSION JOINT
�AS REOUIREO
FELT TO EXTEND 1" PAST BOTTOM
5-1/2" 2% 6" MIN ,
OF CURB AND GUTTER
1/Z" T--------- _
4-INCH COMPACTED DEPTH=
CRUSHED SURFACING TOP COURSE
- _
18 4" CRUSHED SURFACING
TOP COURSE
THICKEN EDGE OF APPROACH TO .
FULL DEPTH OF CURB
SECTION A -A
1. THRU JOINTS AND CONTRACTION JOINTS SHALL BE AS
i SHOWN ABOVE THRU JOINTS SHALL ALSO BE PLACED
i � IN THE SIDEWALK SECTION AT DRIVEWAY AND ALLEY
RETURNS. ALL JOINTS SHALL BE CLEAN AND EDGED
NTH AN EDGE HAVING 1/4" RADIUS. JOINTS SHALL BE
FLUSH NTH THE FINISHED SURFACE
5
2z
i i
i 2. ALL UTILITY POLES, METER BOXES, ETC, IN SIDEWALK
TCURB AREAS SHALL HAVE 3/8" JOINT MATERIAL (FULL
CUTTER DEPTH) PLACED AROUND THEM BEFORE PLACING
i CONCRETE
15,
i 3.PREMOLOED JOINT FILLER SHALL BE 3/8" x 2"
S
2%
i i ASPHALT SATURATED FELT OR PAPER.
i
4. FORMS SHALL BE OTHER WOOD OR STEEL AND SHALL
MEET ALL REQUIREMENTS OF THE SPECIFICATIONS.
i 5. CONCRETE SHALL BE PERVIOUS PER THE
DIRECTION
OF BROOM
i SPECIFICATIONS.
5
FINISH
i
6. THE SURFACE FINISH SHALL BE LIGHTLY BRUSHED IN A
:1/4" TRANSVERSE DIRECTION NTH A SOFT BRUSH. ALL
:GROOVE O MAX. EDGES TO BE FINISHED WITH A 3" TROWEL
5' O.C.
L� Y
SEE PLANS
PERVIOUS CONCRETE SIDEWALK DETAIL
NOT TO SCALE 4
21'
SLOPE FOR DRY SWALE AREA
III— f 2.85 I SLOPE FOR WET SWALE AREA _I —
_
I I�
NOTES:
1. PLANTS WTHIN THE WET BIOSWALE SHALL BE TOLERANT OF I �- I
PONDING FLUCTUATIONS AND SATURATED SOIL CONDITIONS
AND DROUGHT DURING THE SUMMER MONTHS. ALLOWABLE I BOTTOM WIDTH-72' _
PLANTS AND SPACING ARE SHOWN IN TABLE 1.
2. PLANT SEVERAL SPECIES OF GRASS FOR MORE FAVORABLE
GROWTH.
3. WEILAND SEED MIX MAY BE APPLIED, BUT IF COVERAGE IS
POOR THEN REPLANTING WITH ROOTSTOCK IS REWIRED.
(POOR COVERAGE IS CONSIDERED TO BE MORE THAN 30%
BARE AREAS.)
4. CATTAIL PLANTINGS NOT ALLOWED.
p. �q ANN C,
�c
s a
�^ '�> 7T77B � b"b AA tAp SQJIf �p �b
C'STBNALr�sU�NAL`
WET 6108WALE CROSS SECTIONr4
4
2" COMPOST TILLED INTO
6" NATIVE SOIL
CEMENT CONCRETE DRIVEWAY ENTRANCE TYPE 1
NOT TO SCALE 4
TABLE I
ALLOWABLE PLANTS AND SPACING
O.C.
f
4NSION
12.0' ONE LANE WIDTH(LONGIT
6.5' MIN (TRANSVERSE)
1' MIN (TRANSVERSE XINC) r1' MIN 1' MIN
3' MIN (LONGINTUNDINAL XINC) !
SPECIAL PRECAUTIONS
TO PROTECT PIPE TO
THIS LEVEL. DEPTH
TO PIPE CROWN
VARIES, SEE PLANS 12"1
MIN.
CPEP FOR STORM
OR DUCTILE IRON
PIPE WITH
POLYWRAP FOR
WATER MAIN
FINISHED
GRADE
12 — 3'-0"
24" — 4'-0"
v
FACE
CURB °F� 6 1/2"
1/2"R
i/2"RA • 1
m
a
• o
6 c
MATCH EXISTING
GENERAL NOTES:
1. PREMCLDED JOINT FILLER SHALL BE ASPHALT SATURATED FELT OR
PAPER.
2. FORM AND SUBGRADE INSPECTION SHALL BE REWIRED PRIOR TO
POURING CONCRETE
3. INSTALL ON A 2" COMPACTED DEPTH LAYER OF CRUSHED
SURFACING TOP COURSE.
3
4. CONCRETE SHALL BE A COMMERCIAL CLASS CONCRETE 4 5
NOT TO SCALE
1' MIN (TRANSVERSE XING)
3' MIN (LONGINTUNDINAL XING)
2" HMA CL lZ"
PG 58-22
6" HMA CL )4"
PG 58-22
6" CRUSHED SURFACING TOP COURSE
PER WSDOT SPECS 9-03.9(3)
TRENCH BACKFIL.L PER
WSDOT 9-03.19
PIPE ZONE BEDDING
PER WSDOT 9-03.12(3)
24" FOUNDATION MATERIL
PER WSDOT 9-03.12(3)
TYPICAL ROAD RESTORATION / TRENCH SECTION
NOT TO SCALE
PRELIMINARY CITY OF LAKE WASHINGTON BLVD NORTH/10
B.P.& -L NOT FOR REN TON STORM WATER & WATER MAIN
E
"' ��.K
CONSULTING NGINEERS@sAc. °ANM Public Works DepL IMPROVEMENTS ..... 13
CONSTRUCTION
N0. REVISION BY DATE APPR
Y
Y
U
2
v
'r
iD
N
rn
0
~O
N
'-1
n
n
SECTION 32, TWP 24 N, R 5 E, W.M.
S n y h
y BRIDGE n
(` r 17+00
, 12 4�VERf BEND (FL X MJ) -
12' 45' kERT.I�BEND X MJ) W/MEGALUG S'M.4CKLE -TO THRUST BLOCK,
W/MEGALUG AND THR T BLOCIV n 12' 45- VERY. BEND (MJ X XJ)
n. W/MEGALUG AND THRUST BLOCK,
IN - 12" 45' VERT, BEND (FL X MJ)
W/MEGALUG SHACKLE TO THRUST BLOCK,
10' MIN 63't 10' MIN
t
12" WATER MAIN PLAN
SCALE: 1 "=10'
RESTRAINED JOINT PIPE AND FITTINGS
100'
EXISTING BRIDGE AND
SID AL
Lmmm
10' MIN
12" WELDED STEEL FIANCE
12" DI SPOOLS (TYPICAL) m
4,L P. 6� ANIV C
q. r .4� �- G r •� l�
met•e�? y
c� ��e aroe � �„ r°o� �•• atn w v`
'1'/Ol1AL "S/AAAL
CONSULTING ENGIPEERS
xwrnr. vnmciu �sur
EXISTING 18' STEEL -
\CARRIER PIPE (17.50 I.D.)
J ANCHOR BLOCK
�12' I.D. WELDED STEEL PIPE
WITH FACTORY APPLIED
FUSION EPDXY COATING PER
AWWA C213.
RUNNERS e
RESTRAINED JOINT PIPE AND FITTINGS
1 DO'
12" WELDED STEEL FLANGE
- EXISTING GRADE
f12' 45- BEND (FL X MJ) W/MEGALUG
- SHACKLE TO THRUST BLOCK,
J• 12- 45- BEND (MJ X MJ) W/MEGALUG
AND THRUST BLOCK, p
� V
POOL
12- DI CL 52
ANCHOR BLOCK �Z;v
12"z12' TEE (FL
W/TRUST BLOCK
THRUST BLOCK THRUST BLOCK 3-12" GATE VALVES
(FL X MJ)
12" WATER MAIN PROFILE
NOT TO SCALE
CASING SCHEDULE
LOCATION
DWQ
CASING
LENGTH
NUMBER OF
SUPPORTS
No.
SIZE
FEET)
REOURIED
LAKE WASHINGTON BLVD
4
18'
65,
8
12'
CARI
EXIS
INERS
STEEL CASING DETAIL
NOT TO SCALE
TYPE 'A- BLOCKING
FOR 11 1/4-22 1/2-30'
VERTICAL BENDS
J
❑L7
❑ z
j
W
� Y
m
z
W
4 o
U
Q U
y z
0:
W
Lr
K
Q t Y
V
W
4 W
❑
N H
(L
.V.. V
A
W
Z
❑
❑ N
W N
F W
W Z
y¢
�-
H
H
❑
❑
W
A Z
Q o
V
a z
d0
H
W
>
z W
N J
OK
A ❑U.z"
4'
300
2
3/4'
1 8
22 1/
12
2 1/4
24
6'
300
1 1/4
iP
231/4
3/4'
24
1/
27
8'
300
2 1/2
3/4'
24
22 1/P125
3 1/2
12-
300
4
1
24
22 I/
5 1
1 1
36
TYPE 'B' BLOCKING
FOR - 45' VERTICAL BENDS
4'
300
L
27
3
3/4'
20
6'
64
4
S.
l25
5
1,
216
6
1
30
SHACKLE RODS
(TYP)
2 TURNBUCn
VB
THREAD 6'T
J
UNDISTURBED
EARTH
S•.CLASS 5
U 1/2' CONC.)
Ij S
TYPE
&-LOCKING
PAINT AS FOR
SHACKLE RODS
4 TURNBUCKLES
THREAD 6' 45'
� 0
r ,
UNDISTURBED
EARTH
S
.. .
CLASS 5
. , . f1: • U 112' CONC.)
r
S�'j I
TYPE 'B'' BLOCKING
VERTICAL ANCHOR BLOCK -STD. PLAN-330.3 3
NOT TO SCALE -
+� CITY OF /20/10
PRELIMINARY
B.P.B. RENTON LAKE WASHINGTON BLVD NORTH
NOT FOR ` C.J.K.STORM WATER & WATER MAIN
CONSTRUCTION 'Sic DATUM Public Works Dept IMPROVEMENTS �14
NO. REVISION BY DATE APPR ar.a '°'z im"�•" _ .m 14"15
.71
_%
Lake Washington Blvd N.
Horizontal and vertical Control
Plans included a table for survey control points but did not sho9w a tie to the City of Renton Horizontal
and vertical Control Survey Network. Typically a developer would be required to show both tie and a
control diagram.
Plans need to include a Sect. Twp. & Rng. at the top of each plan sheet
Storm:
Storm did not show any stationing or offsets. 1�
Storm plan needs to show the R/W linework .�
CB#4 appears to be installed in the sidewalk. Verify
Stationing is on centerline —verify -�
Street intersections need to show a station on centerline —see sheet 5 and label street to south
Water:
Watermain needs to be labeled with pipe length.
Plan set needs to show a 'Before and After' connection detail
Not clear why fire hydrant spacing is up to 100 feet closer than City standard. Typical spacing between
fire hydrants in single family use district zone is 600 feet and in commercial and apartment (including
duplex) is 300 feet
TB= either Tie Bolts or Thrust Block
Plans need to station the high point and install an air vac release.
General:
Delete the shading, it does not microfilm
The sheet numbering is confusing —plan set shows 2 sheet 4 which at first glance look identical, even
the title blocks are close & the line work on both implies that it is the design sheet —I would require the
developer to screen or lighten the utility that was not the main focus. The storm sheet would say storm
water in the title block and the storm pipe would be bold but not the water.
Delete heavy x-hatch it does not micrcofilm
Edit street name to read Lake Washington Blvd N
Project description includes Ripley Lane and Seahawk Way —the plans do not reference either one.
Arneta
SPACEING 1
SAND FILLE
15" WIDE i.
r�aNATFRI WE
■rrrrr�rr�rr�r`�irrmin r�rmmr�rr
r ■rmrrwrr�■ rUrr�r�ra�■
MATCIH>W SEE %JEST W2
♦#
1 /2" CLEARANGL tJt l vyr-r- v r vim. • , ••
AND END OF BELL OF D.I. PIPE
.I. PIPE
VC SDR-35
0" DIAMETER CASING
SING SPACER
EXTEND CASING TO A MINIMUM
20' ON EACH SIDE OF THE CROSSING
rj-
CASING:
SIZE AND MINIMUM DIAMETER OF CASING SHALL BE AS SHOWN ON TH
CONTRACT
ENWIHOWEVER ETINPONSIBLE
FOR LECTTITHE THICKCONSISTENT WITH HIS SHALL
ERAO
CASING SEAL
MINIMUM 3/16" THICK, SHEET TYPE SYNTHETIC RUBBER WITH STAINLESS
STEEL BANDS.
SCHEMATIC SECTION FOfm PVC ENCASE'rvwm-_-NT
NOT TO SCALE �-si TrQ — i 7 — 2POO _-
*DEPTH PER APPLICABLE CCTY/STATE REQUIREMENTS
Steve Lee
From: Steve Lee
Sent: Thursday, May 27, 2010 10:38 AM
To: 'Isaac, Bob'
Subject: RE: Lake WAshington Blvd Storm and Water System Improvement Project
Okay. Great. I had that information too for the sewer.
Our water utility is currently reviewing the 90% plans and will most likely revise the bend and thrust block near the
sewer to get more separation between the two utilities. The water piping is a restrained joint setup and will also have
an extra set of protection with the thrust blocking too.
Thanks for the information. When I get the revised 90%, 1 will send you the final copy.
-Steve
From: Isaac, Bob[mailto:Bob.Isaac@kingcounty.gov]
Sent: Thursday, May 27, 2010 10:19 AM
To: Steve Lee
Subject: RE: Lake WAshington Blvd Storm and Water System Improvement Project
Steve,
I have attached a couple of drawings for your reference. My initial reaction is that the proposed vertical bend and thrust
block are too close to the 36-inch pipe to insure some degree of safety. Look at the elevations and let me know what you
think.
Bob
B. Robert (Bob) Isaac, PIMP
LPA Coordinator (Acting)
201 So. Jackson St.
KSC-NR-0508
Seattle, WA 98104
206-684 1029
bob.isaac@kinocountv.clov
Note: King County a -mails have changed. Please update your contact Isit. Thank you.
From: Steve Lee [mailto:Slee@Rentonwa.gov]
Sent: Thursday, May 27, 2010 8:40 AM
To: Isaac, Bob
Cc: Barry Baker; Stacey Clear
Subject: Lake WAshington Blvd Storm and Water System Improvement Project
:..
Thanks for getting back to me and talking this morning. Attached is the water system plan improvement portion
(approximately 80%-90% design). We plan on starting water construction work during mid to late September if
everything falls together in time. Any sort of information you may have would be greatly appreciated.
Again Thanks.
Steve Lee, PE
City of Renton
Project Manager
425-430-7205
FIRE UU;"-R
& EMERGENCY SERVICES
DEPARTMENT
M E M O R A N D U M
DATE: May 25, 2010
TO: Steve Lee, Surface Water Engineer
FROM: Corey Thomas, Plans Review Inspector
SUBJECT: Lake Washington Boulevard North Water System
Improvements (Fronting Hawks Landing)
I have reviewed the 90% water system improvement plans for the above referenced
project and have found them to be acceptable without further revision. Thank you for the
opportunity for imput.
Steve Lee
From: Pat S [pat@sdg-Ilc.com]
Sent: Friday, May 21, 2010 9A2 AM
To: Steve Lee
Cc: danmitzel@mitzel.net
Subject: RE: Hawks Landing - Lake Washington Blvd Utilities
Attachments: SBHC35310052107350. pdf
Steve
I have been discussing options with storm for the Hawks Landing Project, Please review the storm options we would like
to discuss further with the City as outlined below and clouded in Blue on the attached scanned image:
1.) We would like a 12" or greater storm stub at our South Boundary we would like this stubb to be as deep as
possible with gravity drainage to the outfall into May Creek
2.) We would like to re -positions the cities swale such that we can install a additional swale on parallel to Lake
Washington Blvd. This will minimize the impact of the swales on developing the property as well as providing
water quality treatment areas for both projects. This would require some additional piping as shown. I believe the
swales can be maintained from the proposed sidewalk or potentially from the neighboring property depending on
what happens with it.
3.) We would also like a storm stub roughly in the location of the proposed entrance to our site as shown on the
sheet. This stub we would like as deep as possible with positive drainage to the May Creek outfall
Please review and get back with Dan or I concerning these comments. Sorry this took a while to get back to you
Thanks for your time
Pat Severin P.E.
Sound Development Group
P.O. Box 1705
1111 Cleveland Street Suite 202
Mount Vernon, WA 98273
Email: pat(a)sda-Ilc.com
Ph: 360-404-2010
Fax: 360-404-2013
From: Steve Lee [mailto:Slee@Rentonwa.gov]
Sent: Wednesday, May 12, 2010 7:11 AM
To: Pat S; Dan Mitzel
Subject: RE: Hawks Landing - Lake Washington Blvd Utilities
Pat
Yes, we are at the 4" design Swale depth for the designed Swale. We did not want to ask for more drainage easement
area than was necessary to treat roadway runoff off LWB, nor were we asked to provide on -site hotel runoff from Dan
or Spence. That would need to be agreed upon via an agreement.
In order to decrease the swale depth, the width would need to be modified or another 100-feet swale would need to be
built. I believe it would be easier (and cheaper) to physically change only one side of the existing swale in the future to a
wider swale, but that may impact what gets built in that area for Phase 2.
-Steve
From: Pat S [mailto:pat@sdg-Ilc.com]
Sent: Tuesday, May 11, 2010 12:40 PM
To: Steve Lee; danmitzel@mitzel.net; pat@sdg-Ilc.com
Subject: RE: Hawks Landing - Lake Washington Blvd Utilities
Steve
I would like to get a copy of the design drainage calc's for the swale and the analysis of what is being used by the swale
provided. Are you indicating that we are already at the 4" design depth and there is no remaining capacity?
Pat Severin P.E.
Sound Development Group
P.O. Box 1705
1111 Cleveland Street Suite 202
Mount Vernon, WA 98273
Email: pat(cbsdg-Ilc.com
Ph: 360-404-2010
Fax: 360-404-2013
From: Steve Lee [mailto:Slee@Rentonwa.gov]
Sent: Monday, May 10, 2010 9:49 AM
To: Pat S; Dan Mitzel
Cc: Vanessa Dolbee
Subject: FW: Hawks Landing - Lake Washington Blvd Utilities
Pat,
See below comments by Abdoul Gafour. The water has been modified already.
Also, our preliminary work with the 60% designs already have stubs, etc. for an additional future wet bio-swale facility (if
needed). Remember that for wet bioswale facilities design parameters allow only 4"maximum depth of flow in a wet
bio-swale and a 100-feet minimum length with access for a vactor to reach the inlet and outlet. So you may want to
ensure the future facility fits into that space longitudinally. I know the bioswale can be expanded wider to
accommodate more treatment area (which depends on the future development building for phase 2 of course), but
longer I have not looked into.
Thank you for your comments.
-Steve
From: Abdoul Gafour
Sent: Monday, May 10, 2010 9:34 AM
To: Steve Lee
Subject: RE: Hawks Landing - Lake Washington Blvd Utilities
Steve,
My review comments of the 60% design plans already included 12" water stubs with 3-valves cluster to both the south
driveway (Sta. 20+55) and to the north driveway (Sta. 24+75) to the Hawks landing development.
We are also providing another 12" stub to the south property line (Sta. 17+10), south of the proposed bioswale, in case
we need a looped water main around the proposed southwest tower building.
The majority of the existing on -site 12" water line must be abandoned to accommodate the new buildings and related
improvements. A small section of the existing along the southeast corner of the property will remain.
Abdoul Gafour
Water Engineering Supervisor
City of Renton Public Works
1055 S Grady Way
Renton, WA 98057
425-430-7210
agafour@rentonwa.gov
From: Steve Lee
Sent: Monday, May 10, 2010 8:19 AM
To: Ronald Straka; Abdoul Gafour
Subject: FW: Hawks Landing - Lake Washington Blvd Utilties
Abdoul,
Attached is an email from the hotel developers' engineer. I do not see a problem with stubbing out with a 12-inch line
to their site except with potential water quality water age issues if they do not use too much water? Let me know if you
have any problems with us making those tees into 12"x12"x12" junctions.
Thanks,
Steve
From: Pat S [mailto:pat@sdg-Ilc.com]
Sent: Friday, May 07, 2010 11:14 AM
To: Steve Lee
Cc: danmitzel@mitzel.net; Pat S
Subject: Hawks Landing - Lake Washington Blvd Utilties
Steve
I do have a couple of comments on your plans after discussing them with Dan Mitzel
1.) The proposed waterlines (2) to serve our site are 8", 1 would request that this lines be made a 12" line as this is what
currently serves our site as well as giving the developer more option on site as well as raising a question. The plans
appear to indicate that the existing 12" looped line through out site is going to be abandoned. Is this the case?
2.) We were discussing the options for storm and I came up with the following schematic. It show you diverting structure
being moved north so we could utilize more length in a future bio filtration swale expansion to take our sight into
consideration or to treat the additional flow from our development. We would have to temporarily run the swale water
around the existing building which could be done with a couple of clean outs. We would also like a stub to our site so we
can "plug" into this system. The flow diverter could be done so we can change the orifice to divert additional flows. I would
think a 60" mahole with a dividing wall set at the top of the outlet(diverting structure) would work. I would meter flow to the
swale now and in the future with a 12" (or whatever the pipe size is) plug. The drill the appropriate hole diameter with a
head that given by the wall height.
Let me know what you think and thanks for your consideration
Pat Severin P.E.
Sound Development Group
P.O. Box 1705
1111 Cleveland Street Suite 202
Mount Vernon, WA 98273
Email: pat .sdg-Ilc.com
Ph: 360-404-2010
Fax: 360-404-2013
N.14f MON\MSEI It W. WA - IMwY3 11rNY•y CmnWmr ImPV1INSlTrlNyl�N 4rRTi-•aG.lpu11, 7/1 i//010.i1 . if N1, lM4
r AINw(.
,�
� i
h�
•r-
b
I
`
y V
�
r
it `a!■! �
� 1
��
��
I
�f
�� ' y4 �• All
_
ryi
�t
�
pAls11
r • 1 ���` I�r �,v
, , I �
�9 •I
F
v
��Y S �r a e�f•�_s � MHip
sil
A'S
XL
0 ,
, 1
`
...
F
` t wig••• �!!
J�� V,
c
b
F
•a
tSL=r
-oc m
A,SSV LNYMOA)oau _ +
o
Sov .vz +u r 1 r s m
30 n 09 ■av3� a aV��, 1 1 N
�mrFaisr orn 3AOM37f k
m
1�i—_�------- or.+
— / OIONU.zL "T-
l+ouvam s+Ht eo wnow ct
+d B=T4xiatsr+oo of uo
x--... __ _._ _-.-_
x
I
x 1 O t�` // ' C1TY TO CONSTt5UC7 (MRB-C*& !`✓
�; _ _ �� i — / I TO NORTH OF TWS IOCATtON-
. �
Al
DOES NO. 04CLUDE zw EX x
'�_--�
STA 17+50-----�—J.£
—N�'�--�
`
AL G G LMTY POLE TO BE—
G-1
..
G —` Y tt If,
c—vyasHIGTO�i gLVD OTHERS A�CTot-
L/ETO
1
d o G
G —__ �- G _—
MJ W,itB�
STA t6d
—
=
T r T�
11
\`. 1J W, �DI
[t�REMOVE AMD A516tAM E7DSTtNG
124�AD5 D 60M OF ETaSTWG
1
♦\.------
1�
a.�T.
/.AVEL ACCESS—�=27.15 ---
1MTH CONCRETE
ACCESS PAt7
T
VVF
40`n
`,
Y�
m
((h��
Z¢
G ly+
IL N�
Y!�
35`
30
2
20 16+30
n
—1 jam. -GRAVEL ACCESS
WTH CONCRETE
y [ ACCESS PAD
W
K
.. .. - .... .... ...... ... .. --........_. ... ..._ - ... .. . .
40
Efi SING GRCUNO AT
PROPOSED STORY- '-CROUICS AT - ': 35
ALICNMCNT.
41
— tFro.ottoz.._--
-�tY1
..'!56 LF 24�
t t 24 0 i96 1F* 24' PVC
_mil_ _
-- --- —
- - 2 5
T cool
_s.. _..... .........
.= ..._
s�naom
_.. _..
-OI1iLET
t'
1-E-26.46-
:. ... __�
.*oo.
------- - 1a+oc
i _ _
- -
zifso.... .... _..... _..- ... ...... od20
�?
�Zz
3W
tZW
1�/IZN
ZN •
tl
NW �
oa
1aa Y
O
�
(N�Z
>�
I
I
UUU I
46W
a
UU(a � I
6Q
UU I
as
h
rY N
rrfv N
Yr/V
rr
rr
NN as
Nh p-p CCC
NN
00
51-
1 1
1 1 1
h! o
37331
t or. I-•�G�i-
,'T'DXAL ,"ORAL *'
20' 10' 0 20' 40'
= 20:
PRELIMINARY a AM �r _1 CITY OF HAWKS WASHILANDINSTORMLLV ER 2/26/10
�O�oa�n, Yat> NOT FOR K IMPROVEMENTS
COHSULTSHG E1+GINEERS CONSTRUCTION r�5�,
1 wNu Plenning/Buildinq/Public Work3 Deft. 4
n vm .w.a< Imu aurrz re n
N0. REo> e 4 r. 7
VISION BY pATt APPR a°`I ®'
a r Wes•
1 • � � ' a . ae c
o
*00
PP'At UK:
a<<�. ' � �s�w��r--���Y.l���'�A��fs �� J �1��1� 10s v _�`s� • .�- • v �• ..
•i �r��' •o -``:%�i±r" l�,P 1►a•'•�I�'�/��aN N 1W:i�0� •f i�61'',♦,_�+"`+., �•�.r�
0.
r`� ♦.sir. �f �' \`�'�%� •a =• I� C �Ii a"•ji Y+�I �� �� .
VON
r �. �.. /F� /•. . 1 `'••C��,�'�S:P� a`• _
``i�•y+ +- ► rO M ♦ : `� ♦� : •�
_1 •a � • .. '� • �\�-I . sr+�f f r� �� ��i ,�•/+♦M�Mi+p. �-(��iv°'''�� r�r � aN��S�r+ �+P�
rs'.. �0���'Ns�/1'[al:�W�� lL�i�-�.i�L+iE ���t�tA�\�1H�i11►�s�
•1 1
tea.
- .. •h
ft
I. '.T' r rile" ¢rb r//RrvvT vm /
♦.��� .5C .'Q'��'� T'� i•H 4sy`,yiV•HVr'!/i/P/iY'd''iY ••'v �i'i'i'i H'i� .i v�ia•i iHH/i:2r iriv H'i'
♦ ♦ ♦ � �',�' � i Hl' <'�'C � '' "�iv�/�/�/'/�v�/"� 'i vv H-/ri H'H•/'��/'i /'i-i�:��'J-� r y,.y� ��� ��'
1 �� � �,• �� � � � �.G,f�r�/` .�,t.<:�;U•;�i�i:.c.Yi.Y;�T/ivi /i'H�. ✓i y`H.Yi,'/,�'• 1:•�' 1
r rr „ rl 1
rIN
P. �.{ ILL C
k 0 *, 37a. `�`.•�• �oa�,.�0 wn �s,•G ' 20' 10' 0 20' 40'
A ONAL JS�ONAL T'`
1' = 20:
� D-35310
PRELIMINARY a" CITY OF LAKE WASHINGTON BLVD 2/26/10
RENTON HAWKS LANDING STORM WATER
C=a,a��Om�,aam,Iaa NOT FOR ��J'N' IMPROVEMENTS
_CONSULTING ENGINEERS °m�$AC,
w 1 Plonning/Building/Public Works Dept. 4
�•»>�>m.. CONSTRUCTION . NoREvsION ar DATE APPR
aurnt .oairra ,der a.0 sr-s.e B.P.E. �...®�.
SUBMITTAL REQUIREMENTS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
City of Renton Planning Division
1055 South Grady Way -Renton, WA 98057
Phone: 425-430-7200 Fax: 425-430-7231
PURPOSE: To ensure proposed shoreline development is consistent with the goals and policies of the
Shoreline Master Program.
FREE CONSULTATION MEETING: Prior to submitting an application, the applicant should informally
discuss the proposed development with the Planning Division. The Planning Division will provide
assistance and detailed information on the City's requirements and standards. Applicants may also take
this opportunity to request the waiver of the City's typical application submittal requirements, which may
not be applicable to the specific proposal. For further information on this meeting, see the instruction
sheet entitled "Submittal Requirements: Pre -Application."
APPLICATION SCREENING: Applicants are encouraged to bring in one copy of the application
package for informal review by staff, prior to making the requested number of copies, colored
drawings, or photo reductions. Allow approximately 45 minutes for application screening.
COMPLETE APPLICATION REQUIRED: In order to accept your application, each of the numbered
items must be submitted at the same time. If you have received a prior written waiver of a submittal
item(s) during a pre -application meeting, please provide the waiver form in lieu of any submittal item not
provided. All plans and attachments must be folded to a size not exceeding 81/2by 11 inches.
APPLICATION SUBMITTAL HOURS: Applications should be submitted to Development Services staff
at the 6th floor counter of Renton City Hall, 1055 South Grady Way, between 8:00 A.M. and 4:00 P.M.
Monday through Friday. Please call your assigned project manager to schedule an appointment or call
(425) 430-7200 extension 4 to reach the Planning Division. Due to the screening time required,
applications delivered by messenger cannot be accepted.
ADDITIONAL PERMITS: Additional permits from other agencies may be required. It is the applicant's
responsibility to obtain these other approvals. Information regarding these other requirements may be
found at http://apps.ecy.wa.gov/opas/
All Plans and Attachments must be folded 8'/2"bY 11"
APPLICATION MATERIALS:
1. ❑ Pre -Application Meeting Summary: If the application was reviewed at a "pre -application
meeting", please provide 5 copies of the written summary provided to you.
2. ❑ Waiver Form: If you received a waiver form during or after a "pre -application meeting", please
i - 06/09
H:ICEDIData\Forms-Templates\Self-Help HandoutslPlanning\sm.doc
provide 5 copies of this form.
3. ❑ Plat Certificate or Title Report: Please provide 3 copies of a current Plat Certificate or Title
Report obtained from a title company documenting ownership and listing all encumbrances of the
involved parcel(s). The Title Report should include all parcels being developed, but no parcels
that are not part of the development. If the Plat Certificate or Title Report references any
recorded documents (i.e. easements, dedications, covenants) 5 copies of the referenced
recorded document(s) must also be provided. All easements referenced in the Plat Certificate
must be located, identified by type and recording number, and dimensioned on the Site Plan.
4. ❑ Land Use Permit Master Application Form: Please provide the original plus 11 copies of the
COMPLETED City of Renton Planning Division's Master Application form. Application must have
notarized signatures of ALL current property owners listed on the Title Report. If the property
owner is a corporation, the authorized representative must attach proof of signing authority on
behalf of the corporation. The legal description of the property must be attached to the
application form.
5. ❑ Rezone, Variance, Modification, or Conditional Use Justification: Please contact the
Planning Division to determine whether your project proposal triggers any additional land use
permits. If so, additional information may be required.
6. ❑ Environmental Checklist: Please provide 12 copies of the Environmental Checklist. Please
ensure you have signed the checklist and that all questions on the checklist have been filled in
before making copies. If a particular question on the checklist does not apply, fill in the space
with "Not Applicable."
7. ❑ Project Narrative: Please provide 12 copies of a clear and concise description of the proposed
project, including the following:
• Project name, size and location of site
• Land use permits required for proposed project
• Zoning designation of the site and adjacent properties
• Current use of the site and any existing improvements
• Special site features (i.e. wetlands, water bodies, steep slopes)
• Statement addressing soil type and drainage conditions
• Proposed use of the property and scope of the proposed development
• For plats indicate the proposed number, net density and range of sizes (net lot area)
of the new lots
• Access
• Proposed off -site improvements (i.e. installation of sidewalks, fire hydrants, sewer
main, etc.)
• Total estimated construction cost and estimated fair market value of the proposed
project
• Estimated quantities and type of materials involved if any fill or excavation is
proposed
• Number, type and size of any trees to be removed
• Explanation of any land to be dedicated to the City
• Any proposed job shacks, sales trailers, and/or model homes
• Any proposed modifications being requested (include written justification)
For projects located within 100 feet of a stream or wetland, please include:
Distance in feet from the wetland or stream to the nearest area of work
For projects located within 200-feet of Black River, Cedar River, Springbrook Creek, May Creek
and Lake Washington please include the following additional information:
• Distance from closest area of work to the ordinary high water mark.
• Description of the nature of the existing shoreline
• The approximate location of and number of residential units, existing and potential,
that will have an obstructed view in the event the proposed project exceeds a height
of 35-feet above the average grade level
-2-
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\sm.doc
O6/09
8. ❑ Construction Mitigation Description: Please provide 5 copies of a written narrative
addressing each of the following:
• Proposed construction dates (begin and end dates)
• Hours and days of operation
• Proposed hauling/transportation routes
• Measures to be implemented to minimize dust, traffic and transportation impacts,
erosion, mud, noise, and other noxious characteristics
• Any special hours proposed for construction or hauling (i.e. weekends, late nights)
• Preliminary traffic control plan
If your project requires the use of cranes, please contact the City's Airport Manager at (425) 430-
7471 to determine whether Federal Aviation Administration notification will be required.
9. ❑ Fees: The application must be accompanied by the required application fee (see Fee Schedule).
Land use fees are calculated by charging the full amount for the most expensive land use permit
needed and half-price for each additional land use permit. Please call (425) 430-7294 to verify
the exact amount required. Checks should be made out to the City of Renton and cannot be
accepted for over the total fee amount.
10. ❑ Neighborhood Detail Map: Please provide 12 copies of a map drawn at a scale of 1" = 100' or
1" = 200' (or other scale approved by the Planning Division) to be used to identify the site
location on public notices and to review compatibility with surrounding land uses. The map shall
identify the subject site with a much darker perimeter line than surrounding properties and
include at least two cross streets in all directions showing the location of the subject site relative
to property boundaries of surrounding parcels. The map shall also show: the property's lot lines,
surrounding properties' lot lines, boundaries of the City of Renton (if applicable), north arrow
(oriented to the top of the plan sheet), graphic scale used for the map, and City of Renton (not
King County) street names for all streets shown. Please ensure all information fits on a single
map sheet.
Kroll Map Company (206-448-6277) produces maps that may serve this purpose or you may use
the King County Assessor's maps as a base for the Neighborhood Detail Map. Additional
information (i.e. current city street names) will need to be added by the applicant.
11. ❑ Landscape Plan, Conceptual: Please provide 5 copies of a fully -dimensioned plan drawn at
the same scale as the project site plan (or other scale approved by the Planning Division), clearly
indicating the following:
• Date, graphic scale, and north arrow
• Location of proposed buildings, parking areas and access, and existing buildings to
remain
• Names and locations of abutting streets and public improvements, including
easements
• Existing and proposed contours at two -foot intervals or less
• Location and size of planting areas
• Location and height of proposed berming
• Location and elevations for any proposed landscape -related structures such as
arbors, gazebos, fencing, etc.
• Location, size, spacing and names of existing (to remain) and proposed shrubs,
trees, and ground covers. Locations of decorative rocks or landscape improvements
in relationship to proposed and existing utilities and structures
• Trees to be retained and associated driplines
• For wireless communication facilities, indicate type and locations of existing and new
plant materials used to screen facility components and the proposed color(s).
12. ❑ Site Plan: Please provide 12 copies of a fully -dimensioned plan sheet drawn at a scale of 1 "=20'
(or other scale approved by the Planning Division). We prefer the site plan be drawn on one
- 3 - 06/09
H:\CED\Data\Forms-Templates\Self-Help HandoutsTlanning\sm.doc
sheet of paper unless the size of the site requires several plan sheets to be used. If you are
using more than a single plan sheet, please indicate connecting points on each sheet.
The Site Plan should show the following:
• Name of proposed project
• Date, scale, and north arrow (oriented to the top of the paper/plan sheet)
• Drawing of the subject property with all property lines dimensioned and names of
adjacent streets
• Widths of all adjacent streets and alleys
• Location of all existing public improvements including, but not limited to, curbs,
gutters, sidewalks, median islands, street trees, fire hydrants, utility poles, etc., along
the full property frontage
• Location and dimensions of existing and proposed:
1. structures
2. parking, off-street loading space, curb cuts and aisle ways
3.fencing and retaining walls
4.free-standing signs and lighting fixtures
5.refuse and recycling areas
6. utility junction boxes and public utility transformers
7.storage areas and job shacks/sales trailers/model homes
• Location and dimensions of all easements referenced in the title report with the
recording number and type of easement (e.g. access, sewer, etc.) indicated
• Location and dimensions of natural features such as streams, lakes, required buffer
areas, open spaces, and wetlands
• Ordinary high water mark and distance to closest area of work for any project
located within 200-feet from a lake or stream
13. ❑ Architectural Elevations: Please provide 5 copies, for each building and each building face
(N,S,E,W), of a 24" x 36" fully -dimensioned architectural elevation plan drawn at a scale of 1/4" _
1' or 1/8" = 1' (or other size or scale approved by the Planning Division). The plans must clearly
indicate the information required by the "Permits" section of the currently adopted Uniform
Building Code and RCW 19.27 (State Building Code Act, Statewide amendments), including, but
not limited to the following:
• Identify building elevations by street name (when applicable) and orientation i.e.
Burnett Ave. (west) elevation
• Existing and proposed ground elevations
• Existing average grade level underneath proposed structure
• Height of existing and proposed structures showing finished roof top elevations
based upon site elevations for proposed structures and any existing/abutting
structures
• Building materials and colors including roof, walls, any wireless communication
facilities, and enclosures
• Fence or retaining wall materials, colors, and architectural design
• Architectural design of on -site lighting fixtures
• Screening detail showing heights, elevations, and building materials of proposed
screening and/or proposed landscaping for refuse/recycling areas
• CROSS SECTION OF ROOF SHOWING LOCATION AND HEIGHT OF ROOF -TOP
EQUIPMENT (INCLUDE AIR CONDITIONERS, COMPRESSORS, ETC.) AND
PROPOSED SCREENING
14. ❑ Floor Plans: Please provide 5 copies of a plan showing general building layout, proposed uses
of space, walls, existing and proposed locations of kitchens, baths, and floor drains, with
sufficient detail for City staff to determine if an oil/water separator or grease interceptor is
required and to determine the sizing of a side sewer.
15. ❑ Wetland Assessment: Please provide 12 copies of the map and 5 copies of the report if ANY
wetlands are located on the subject property or within 100 feet of the subject property. The
- 4 - 06/09
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\sm.doc
wetland report/delineation must include the information specified in RMC 4-8-120D. In addition,
if any alteration to the wetland or buffer is proposed, 5 copies of a wetland mitigation plan is
also required.
16. ❑ Standard Stream or Lake Study: Please provide 12 copies of a report containing the
information specified in RMC Section 4-8-120D. In addition, if the project involves an
unclassified stream, a supplemental stream or lake study is also required (12 copies). If any
alteration to a water -body or buffer is proposed a supplemental stream or lake study (12
copies) and a mitigation plan (12 copies) are also required.
17. ❑ Tree Cutting/Land Clearing (Tree Inventory) Plan: Please provide 4 copies of a plan, based
on finished grade, drawn to scale with the northern property line at the top of the paper if ANY
trees or vegetation are to be removed or altered (if no trees or vegetation will be altered, please
state so in your project narrative). The plan shall clearly show the following:
• All property boundaries and adjacent streets
• Location of all areas proposed to be cleared
• Types and sizes of vegetation to be removed, altered, or retained. This requirement
applies only to trees 6" caliper "at chest level" and larger
• Future building sites and drip lines of any trees which will overhang/overlap a
construction line
• Location and dimensions of rights -of -way, utility lines, and easements
• Any trees on neighboring properties which are within 25-feet of the subject property
and which may be impacted by excavation, grading or other improvements
18. ❑ Tree Retention Worksheet: Please provide 2 copies of a completed City of Renton tree
retention worksheet.
19. ❑ Flood Hazard Data: Please provide 12 copies of a scaled plan showing the nature, location,
dimensions, and elevations of the area in question; existing or proposed structures, fill, storage of
materials, and drainage facilities. Also indicate the following:
• Elevation in relation to mean sea level of the lowest floor (including basement) of all
structures
• Elevation in relation to mean sea level to which any structure has been floodproofed
• Certification by a registered professional engineer or architect the floodproofing
methods criteria in RMC 4-3-050 have been met
• Description of the extent to which a watercourse will be altered or relocated as a
result of proposed development
20. ❑ Habitat Data Report: If the project site contains or abuts a critical habitat per RMC 4-3-050135b,
please provide 12 copies of a report containing the information specified in Section 4-8-120D of
the Renton Municipal Code.
21. ❑ Grading Plan, Conceptual: This is required if the proposed grade differential on -site will exceed
24" from the top of the curb or if the amount of earth to be disturbed exceeds 500 cubic yards.
Please provide 12 copies of a 22" x 34" plan drawn by a State of Washington licensed civil
engineer or landscape architect at a scale of 1" to 40' (horizontal feet) and 1" to 10' (vertical feet)
(or other size plan sheet or scale approved by the Planning Division Plan Review Supervisor)
clearly indicating the following:
• Graphic scale and north arrow
• Dimensions of all property lines, easements, and abutting streets
• Location and dimension of all on -site structures and the location of any structures
within 15-feet of the subject property or that may be affected by the proposed work
• Accurate existing and proposed contour lines drawn at two -foot, or less, intervals
showing existing ground and details of terrain and area drainage to include
surrounding off -site contours within 100-feet of the site
• Location of natural drainage systems, including perennial and intermittent streams
and the presence of bordering vegetation
- s - 06/09
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\sm.doc
• Setback areas and any areas not to be disturbed
• Finished contours drawn at two foot intervals as a result of grading
• Proposed drainage channels and related construction with associated underground
storm lines sized and connections shown
• Finished floor elevation(s) of all structures, existing and proposed
General notes addressing the following (may be listed on cover sheet):
• Area in square feet of the entire property
• Area of work in square feet
• Both the number of tons and cubic yards of soil to be added, removed, or relocated
• Type and location of fill origin, and destination of any soil to be removed from site
22. ❑ Utilities Plan, Generalized (sewer, water, stormwater, transportation improvements):
Please provide 5 copies of a plan drawn on 22" x 34" plan sheets using a graphic scale of 1" _
40' (or other size or scale approved by the Planning Division) clearly showing all existing (to
remain) and proposed public or private improvements to be dedicated or sold to the public
including, but not limited to, curbs, gutters, sidewalks, median islands, street trees, fire hydrants,
utility poles, free-standing lighting fixtures, utility junction boxes, public utility transformers, etc.,
along the full property frontage. The finished floor elevations for each floor of proposed and
existing (to remain) structures shall also be shown.
23. ❑ Drainage Control Plan: Please provide 5 copies of a plan drawn to scale and stamped by a
Washington State licensed professional engineer and complying with the requirements of Renton
Municipal Code, Section 4-6-030 and the King County Surface Water Management Design
Manual, 1990 edition, as adopted by the City of Renton.
24. ❑ Drainage Report: Please provide 4 copies of a report complying with the requirements of the
City of Renton Drafting Standards, Section 4-6-030 of the City of Renton Municipal Code and the
King County Surface Water Management Design Manual (KCSWDM), 1990 edition, as adopted
by the City of Renton. The report must contain the following:
• The stamp and signature of a Washington State licensed professional engineer
• Complete Technical Information Report (TIR) Worksheet
• A description of the existing and proposed on -site drainage features and
construction required
• Core and Special Requirements: Show that Core Requirements 1 — 5
Section 1.2 of KCSWDM are addressed
• Show that all Special Requirements in Section 1.3 of KCSWDM that are
applicable to this project are addressed
• Biofiltration swale preliminary and conceptual design calculations (per Section 4.6),
if for project site sub -basins with more than 5000 square feet of new
impervious area subject to vehicular use or storage of chemicals
• Wet pond sizing preliminary and conceptual design calculations
• A Level 1 Off -Site Analysis, as described in Core Requirement #2. (Level 2
or 3 analysis may be requested later if a downstream problem is found or
anticipated from review of the initial submittal of the Drainage Report)
25. ❑ Geotechnical Report: Please provide 5 copies of a study prepared and stamped by a State of
Washington licensed professional engineer including soils and slope stability analysis, boring
and test pit logs, and recommendations on slope setbacks, foundation design, retaining wall
design, material selection, and all other pertinent elements.
26. ❑ Traffic Study: Please provide 5 copies of a report prepared by a State of Washington licensed
professional engineer containing the elements and information identified in the City of Renton
"Policy Guidelines for Traffic Impact Analysis of New Development" in sufficient detail to define
potential problems related to the proposed development and identify the improvements
necessary to accommodate the development in a safe and efficient manner.
.6. 06/09
H:\CED\Data\Forms-Templates\Self-Help HandoutsTlannin&m.doc
27. ❑ Engineering Report (For dredging operations only): Please provide 5 copies of an
engineering report detailing all proposed dredging operations planned by an appropriate State
licensed professional engineer per RMC 4-3-0901-6.
28. ❑ Urban Design Regulations Analysis: For projects located within an Urban Design District (see
map in RMC 4-3-100134), please provide 3 copies of a narrative outlining how the applicant's
proposal addresses the City's Urban Design Regulations found in RMC 4-3-100. Prior to
submitting your application, please contact your assigned City staff planner to obtain the
applicable design district checklist to assist you in addressing issues relative to your particular
site and project.
29. ❑ Plan Reductions: Please provide one 81/2" x 11" legible reduction of each full size plan sheet
(unless waived by your Project Planner). The sheets that are always needed in reduced form
are: landscape plans, conceptual utility plans, site plan or plat plan, neighborhood detail map,
topography map, tree cutting/land clearing plan, critical areas plans, grading plan, and building
elevations. These reductions are used to prepare public notice posters and to provide the public
with information about the project. The quality of these reductions must be good enough so that
a photocopy of the reduced plan sheet is also legible. The reduced plans are typically sent in
PDF format to the print shop and then are printed on opaque white mylar-type paper (aka rhino
cover) to ensure legibility. If your reduced plans are not legible once photocopied, you will need
to increase the font size or try a different paper type. Illegible reductions cannot be accepted.
Please also be sure the reduced Neighborhood Detail Map is legible and will display enough
cross streets to easily identify the project location when cropped to fit in a 4" by 6" public notice
space. Once the reductions have been made, please also make one 81/2" x 11" regular
photocopy of each photographic reduction sheet. Some of the local Renton print shops that
should be able to provide you with reductions of your plans are Alliance Printing (425) 793-5474,
Apperson Print Resources (425) 251-1850, and PIP Printing (425) 226-9656. Nearby print shops
are Digital Reprographics (425) 882-2600 in Bellevue, Litho Design (206) 574-3000 and
Reprographics NW/Ford Graphics (206) 624-2040.
30. ❑ Colored Maps for Display (DO NOT MOUNT ON FOAM -CORE OR OTHER BACKING):
Please color 1 copy of each of the following full size plan sheets (24" x 36") or other size
approved by the Planning Division) with a 1/4" or larger felt tip marker for use in presenting the
project to the Environmental Review Committee and at any required public hearing:
• Neighborhood Detail Map
• Site Plan
• Landscaping Plan
• Elevations
The following colors are required:
Red -North Arrow, outer property boundary. Proposed new lot lines (dashed). Do not color
existing lot lines which are to be eliminated or relocated.
Blue -Street names identified with lettering of at least 1" in height. Street names must be
legible at a distance of 15-ft.
Brown -Existing buildings (Please do not color buildings which will be demolished or
removed)
Yellow -Proposed buildings
Light Green -Landscaped areas
Dark Green -Areas of undisturbed vegetation
All Plans and Attachments must be folded to 81/2" by 11"
- 7 - 06/09
H:\CED\Data\Forms-Templates\Self-Help HandoutsTlanning\sm.doc
REVIEW PROCESS: Once a complete land use application package has been accepted for initial
review, the Planning Division will post three notices of the pending application at or near the subject site
and mail notices to property owners within 300 feet of the project site. The proposal will be routed to
other City departments and other jurisdictions or agencies who may have an interest in the application.
The reviewers have two weeks to return their comments to the Planning Division. Within approximately
two weeks, the Planning Division will prepare a report regarding the proposal's compliance with
applicable codes and the City's review criteria.
The application will then be presented to the City's Environmental Review Committee. The
Environmental Review Committee is comprised of the Administrator of Public Works, the Administrator of
Community and Economic Development, the Administrator of Community Services, and the Fire Chief.
The Committee is responsible for determining whether the proposal will result in significant adverse
environmental impacts. To do this, the committee will consider such issues as environmental health
hazards, wetlands, groundwater, energy and natural resources and will then issue its decision
(Environmental Threshold Determination).
The Environmental Review Committee will either issue a:
Determination of Non -Significance (DNS) -Make a determination the proposal will have no
significant negative environmental impacts, or
Mitigated Determination of Non -Significance (DNS-M)-Make a determination the proposal, if
modified, would have no significant negative environmental impacts, or
Determination of Significance (DS)-Make a determination the proposal will have significant
adverse environmental impacts and require the applicant to submit an Environmental Impact
Statement (EIS) prepared by a qualified consultant.
Once the Environmental Review Committee has issued its Environmental Threshold Determination
(provided an EIS is not required), a public notice of the Determination is printed in the Renton Reporter
and three notices are posted at or near the site. A 14-day appeal period commences following the
publication date. At the discretion of the City, a separate and additional 15-day comment period may be
added prior to the 14-day appeal period. The remainder of the review process differs depending on
whether a public hearing is required. Section 4-2-060 of the Renton Municipal Code stipulates whether
or not a public hearing is required.
Shoreline Development Not Requiring a Variance or Conditional Use Permit: A
public hearing is not required. The Planning Division reviews the proposal in
conjunction with the Environmental Review Committee decision and any staff or public
comments prior to making a decision. The decision to approve, conditionally approve,
or deny the proposal will be mailed to all persons listed on the Master Application and
all parties of record. The decision will also be mailed to the State of Washington
Department of Ecology. After receipt of the decision, the Department of Ecology
commences a 21-day review period during which appeals can be made.
Shoreline Development Requiring a Variance, Conditional Use Permit, or
Environmental Review: A public hearing is required. After review of the proposal and
any staff or public comments, the Planning Division staff will forward a report and
recommendation and the Environmental Review Committee decision to the Hearing
Examiner prior to the hearing. This report will be mailed to all persons listed on the
Master Application and all parties of record. Notice of the public hearing will be
published in the Renton Reporter at least 10 days prior to the hearing, the site will be
posted again, and parties of record will receive notices of the hearing via mail.
Applicants are strongly encouraged to attend the public hearing for their proposal. City
staff will first make a presentation to the Hearing Examiner about the proposal. Then
- 8 - 08l09
H:\CED\Data\Forms-Templates\Self-Help HandoutsTlanning\sm.doc
the applicant and any citizens in support of the proposal will give testimony. When
giving testimony, names and addresses must be stated for the record. Following this,
individuals with neutral or opposing comments will give their testimony to the Hearing
Examiner. City staff or the applicant will address additional questions raised throughout
the hearing. The Hearing Examiner will review the proposed application concurrently
with any environmental appeals and issue a final decision(s) within 14 days of the
hearing unless, at the time of the public hearing, the Hearing Examiner indicates
additional time will be required for issuance of the decision. The decision to approve,
conditionally approve, or deny the proposal will be mailed to all persons listed on the
Master Application and all parties of record. The Examiner's decision on any
environmental appeals will also be mailed. The determination of the Examiner is then
forwarded to the Sate Attorney General's Office and the State Department of Ecology
for final approval or denial. If the Department off Ecology and/or Attorney General do
not object to the Examiner's determination within 30 days, the Examiner's decision will
become final.
APPEAL AND RECONSIDERATION PROCESS FOR DECISIONS: Any person, including the
applicant, aggrieved by the granting or denial of an application, may make a written application for
reconsideration to the Reviewing Official within 14 calendar days of the date of the decision. After review
of the request, the Reviewing Official may take whatever action is deemed proper. The Reviewing
Official's written decision on the reconsideration request will be mailed to all parties of record within 10
days from the date the request was filed. If any party is still not satisfied after a reconsideration decision
has been issued, an appeal may be submitted within 14 days to:
The Hearing Examiner for Administrative decisions
The State Shorelines Hearing Board concurrently with State Department of Ecology,
State Attorney General's office, City of Renton Planning/Building/Public Works
Department and the City Clerk for Hearing Examiner decisions. Either the
Department of Ecology or the Attorney General must verify the appeal request as
valid in order to the review to continue. Certification must be given within 30 days.
If the request is verified, the Hearings Board conducts a review and sustains or
overturns the decision of the City of Renton. Any party who fails to obtain
verification or is aggrieved by the decision of the Hearings Board may appeal to the
Superior Court.
An appeal may be filed without first requesting reconsideration by the Reviewing Official;
however, it must be filed within 14 days of the date when the original decision was issued. See
Renton Municipal Code, Section 4-8-110 for further information on the appeal process and time
frames.
BUILDING AND CONSTRUCTION PERMIT ISSUANCE AND INSTALLATION OF IMPROVEMENTS:
In the City of Renton, a Building Permit must be obtained to build buildings and structures. A
Construction Permit must be obtained to install utility lines, transportation improvements and undertake
work in City right-of-ways. Building and Construction Permits are separate permits.
Applicants may apply for building and construction permits concurrently with their request for a land use
application. However, the applicant should be aware any conditions of land use permit approval may
create a need for revisions to other permit applications whereby additional fees may be charged.
Refunds of building permit charges are not available.
If no appeals or reconsideration requests are filed within 14 days of the effective date of the decision to
approve the application, the applicant may obtain building and construction permits. A construction
permit for the installation of on -site and off -site utilities will be issued upon the review and approval of
civil engineering drawings by the Division's Public Works Section and receipt of all applicable
development and permit fees. A building permit will be issued upon the Building Section's approval of
building plans and receipt of all applicable fees.
- 9 - 06/09
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\sm.doc
DEFERRAL OF IMPROVEMENTS: If a developer wishes to defer certain on -site or off -site
improvements (i.e. landscaping, curbs and sidewalks), written application with full and complete
engineering drawings must be submitted to the Planning Division. The application should explain the
reasons why such delay is necessary. If approval is granted, security in the form of an irrevocable letter
of credit, set -aside fund, assignment of funds, certified check or other type of security acceptable to the
City shall be furnished to the City in an amount equal to a minimum of 150% of the estimated cost of the
required improvements.
EXPIRATION AND EXTENSIONS: An approved Shoreline Substantial Development Permit and/or
Shoreline Conditional Use Permit and/or Shoreline Variance shall expire, becoming null and void, two
years from the effective date of the Shoreline Permit/Conditional Use/Variance unless construction
activities have commenced. Where no construction activities are involved, the use or activity shall be
commenced within two years of the effective date of a substantial development permit.
The effective date of a substantial development permit shall be the date of the last action required on the
substantial development permit and all other government permits and approvals for the development
authorizing the development to proceed, including all administrative and legal actions on any permits or
approvals.
A greater length of time may be approved by the City at the time of permit issuance upon finding of good
cause. However, actual construction of the project must be completed within five years of the effective
date of the Shoreline Permit approval. The City of Renton may authorize a single extension for a period
not to exceed one year based on reasonable factors, if a request for extension has been filed before the
expiration date and notice of the proposed extension is given to parties of record on the substantial
development permit and to the State Department of Ecology.
EXPIRATION OF BUILDING PERMIT: Authorization to conduct construction activities shall terminate
five years after the effective date of a substantial development permit. However, the City may authorize
a single extension for a period not to exceed one year based on reasonable factors, if a request for
extension has been filed before the expiration date and notice of the proposed extension is given to
parties of record and to the department.
_ 1 0 _ 06/09
H:\CED\Data\Forms-Templates\Self-Help HandoutsTlanning\sm.doc
City of Renton
LAND USE PERMIT
MASTER APPLICATION
PROPERTY OWNER(S)
NAME:
ADDRESS:
CITY: ZIP:
TELEPHONE NUMBER:
APPLICANT (if other than owner)
NAME
COMPANY (if applicable):
ADDRESS:
CITY: ZIP:
TELEPHONE NUMBER:
CONTACT PERSON
NAME:
COMPANY (if applicable):
ADDRESS:
CITY: ZIP:
TELEPHONE NUMBER AND EMAIL ADDRESS:
PROJECT INFORMATION
PROJECT OR DEVELOPMENT NAME:
PROJECT/ADDRESS(S)/LOCATION AND ZIP CODE:
KING COUNTY ASSESSOR'S ACCOUNT NUMBER(S):
EXISTING LAND USE(S):
PROPOSED LAND USE(S):
EXISTING COMPREHENSIVE PLAN MAP DESIGNATION:
PROPOSED COMPREHENSIVE PLAN MAP DESIGNATION
(if applicable)
EXISTING ZONING:
PROPOSED ZONING (if applicable):
SITE AREA (in square feet):
SQUARE FOOTAGE OF PUBLIC ROADWAYS TO BE
DEDICATED:
SQUARE FOOTAGE OF PRIVATE ACCESS EASEMENTS:
PROPOSED RESIDENTIAL DENSITY IN UNITS PER NET
ACRE (if applicable)
NUMBER OF PROPOSED LOTS (if applicable)
NUMBER OF NEW DWELLING UNITS (if applicable):
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\masterapp.doe - I - 06/09
PROJECT INFORMAL
NUMBER OF EXISTING DWELLING UNITS (if applicable):
SQUARE FOOTAGE OF PROPOSED RESIDENTIAL
BUILDINGS (if applicable):
SQUARE FOOTAGE OF EXISTING RESIDENTIAL
BUILDINGS TO REMAIN (if applicable):
SQUARE FOOTAGE OF PROPOSED NON-RESIDENTIAL
BUILDINGS (if applicable):
SQUARE FOOTAGE OF EXISTING NON-RESIDENTIAL
BUILDINGS TO REMAIN (if applicable):
NET FLOOR AREA ON NON-RESIDENTIAL BUILDINGS (if
applicable):
NUMBER OF EMPLOYEES TO BE EMPLOYED BY THE NEW
PROJECT (if applicable):
IVN (continued
PROJECT VALUE:
IS THE SITE LOCATED IN ANY TYPE OF
ENVIRONMENTALLY CRITICAL AREA, PLEASE INCLUDE
SQUARE FOOTAGE (if applicable):
❑
AQUIFIER PROTECTION AREA ONE
❑
AQUIFIER PROTECTION AREA TWO
❑
FLOOD HAZARD AREA
sq. ft.
❑
GEOLOGIC HAZARD
sq. ft.
❑
HABITAT CONSERVATION
sq. ft.
❑
SHORELINE STREAMS & LAKES
sq. ft.
❑
WETLANDS
sq. ft.
LEGAL DESCRIPTION OF PROPERTY
Attach legal description on separate sheet with the following information included
SITUATE IN THE QUARTER OF SECTION TOWNSHIP RANGE IN THE CITY
OF RENTON, KING COUNTY, WASHINGTON
TYPE OF APPLICATION & FEES
List all land use applications being applied for:
1. 3.
2 4.
Staff will calculate applicable fees and postage: $
AFFIDAVIT OF OWNERSHIP
I, (Print Name/s) , declare under penalty of perjury under the laws of the State of
Washington that I am (please check one) the current owner of the property involved in this application or _ the authorized representative to act
for a corporation (please attach proof of authorization) and that the foregoing statements and answers herein contained and the information herewith are
in all respects true and correct to the best of my knowledge and belief.
(Signature of Owner/Representative)
I certify that I know or have satisfactory evidence that
signed this instrument and acknowledge it to be his/her/their free and voluntary
act for the uses and purposes mentioned in the instrument.
Notary Public in and for the State of Washington
(Signature of Owner/Representative)
Notary (Print)
My appointment expires:
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\masterapp.doc - 2 - 06/09
PLANNING DIVISION
ENVIRONMENTAL CHECKLIST
City of Renton Planning Division
1055 South Grady Way -Renton, WA 98057
Phone: 425-430-7200 Fax: 425-430-7231
PURPOSE OF CHECKLIST:
The State Environmental Policy Act (SEPA), Chapter 43.21C RCW, requires all governmental agencies
to consider the environmental impacts of a proposal before making decisions. An Environmental Impact
Statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the
quality of the environment. The purpose of this checklist is to provide information to help you and the
agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be
done) and to help the agency decide whether an EIS is required.
INSTRUCTIONS FOR APPLICANTS:
This environmental checklist asks you to describe some basic information about your proposal.
Governmental agencies use this checklist to determine whether the environmental impacts of your
proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most
precise information known, or give the best description you can.
You must answer each question accurately and carefully, to the best of your knowledge. In most cases,
you should be able to answer the questions from your own observations or project plans without the need
to hire experts. If you really do not know the answer, or if a question does not apply to your proposal,
write "do not know" or "does not apply'. Complete answers to the questions now may avoid unnecessary
delays later.
Some questions ask about governmental regulations, such as zoning, shoreline, and landmark
designations. Answer these questions if you can. If you have problems, the governmental agencies can
assist you.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of
time or on different parcels of land. Attach any additional information that will help describe your proposal
or its environmental effects. The agency to which you submit this checklist may ask you to explain your
answers or provide additional information reasonably related to determining if there may be significant
adverse impact.
USE OF CHECKLIST FOR NONPROJECT PROPOSALS:
Complete this checklist for nonproject proposals, even though questions may be answered "does not
apply." IN ADDITION, complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D).
For nonproject actions (actions involving decisions on policies, plans and programs), the references in
the checklist to the words "project," "applicant," and "property or site" should be read as "proposal,"
"proposer," and "affected geographic area," respectively.
- 1 - 06/09
H:ICED\Data\Forms-Templates\Self-Help Handouts\Planning\envchlst.doc
A. BACKGROUND
1. Name of proposed project, if applicable:
2. Name of applicant:
3. Address and phone number of applicant and contact person:
4. Date checklist prepared:
5. Agency requesting checklist:
6. Proposed timing or schedule (including phasing, if applicable):
7. Do you have any plans for future additions, expansion, or further activity related to or connected
with this proposal? If yes, explain.
8. List any environmental information you know about that has been prepared, or will be prepared,
directly related to this proposal.
9. Do you know whether applications are pending for governmental approvals of other proposals
directly affecting the property covered by your proposal? If yes, explain.
10. List any governmental approvals or permits that will be needed for your proposal, if known.
11. Give brief, complete description of your proposal, including the proposed uses and the size of the
project and site.
- 2 - 06/09
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\envchlst.doc
12. Location of the proposal. Give sufficient information for a person to understand the precise
location of your proposed project, including a street address, if any, and section, township, and
range if known. If a proposal would occur over a range of area, provide the range or boundaries
of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if
reasonably available. While you should submit any plans required by the agency, you are not
required to duplicate maps or detailed plans submitted with any permit applications related to this
checklist.
B. ENVIRONMENTAL ELEMENTS
1. EARTH
a. General description of the site (circle one); flat, rolling, hilly, steep slopes, mountainous,
other
b. What is the steepest slope on the site (approximate percent slope?)
C. What general types of soils are found on the site (for example, clay, sand, gravel, peat,
muck)? If you know the classification of agricultural soils, specify them and note any
prime farmland.
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so,
describe.
e. Describe the purpose, type, and approximate quantities of any filling or grading
proposed. Indicate source of fill.
f. Could erosion occur as a result of clearing, construction, or use? If so, generally
describe.
g. About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)?
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any:
-3-
06/09
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\envchlst.doc
2. AIR
a. What types of emissions to the air would result from the proposal (i.e., dust, automobile,
odors, industrial wood smoke) during construction and when the project is completed? If
any, generally describe and give approximate quantities if known.
b. Are there any off -site sources of emission or odor that may affect your proposal? If so,
generally describe.
C. Proposed measures to reduce or control emissions or other impacts to air, if any:
3. WATER
a. Surface Water:
1 } Is there any surface water body on or in the immediate vicinity of the site (including year-
round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type
and provide names. If appropriate, state what stream or river it flows into.
2) Will the project require any work over, in, or adjacent to (within 200 feet) the described
waters? If yes, please describe and attach available plans.
3) Estimate the amount of fill and dredge material that would be placed in or removed from
surface water or wetlands and indicate the area of the site that would be affected.
Indicate the source of fill material.
4) Will the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate quantities if known.
5) Does the proposal lie within a 100-year flood plain? If so, note location on the site plan.
6) Does the proposal involve any discharges of waste materials to surface waters? If so,
describe the type of waste and anticipated volume of discharge.
- 4 - 06/09
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\envchlst.doc
b. Ground Water:
1) Will ground water be withdrawn, or will water be discharged to ground water? Give
general description, purpose, and approximate quantities if known.
2) Describe waste material that will be discharged into the ground from septic tanks or other
sources, if any (for example: Domestic sewage; industrial, containing the following
chemicals...; agricultural; etc.). Describe the general size of the system, the number of
such systems, the number of houses to be served (if applicable), or the number of
animals or humans the system(s) are expected to serve.
C. Water Runoff (including storm water):
1) Describe the source of runoff (including storm water) and method of collection and
disposal, if any (include quantities, if known). Where will this water flow? Will this water
flow into other waters, If so, describe.
2) Could waste material enter ground or surface waters? If so, generally describe.
d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if
any:
4. PLANTS
a. Check or circle types of vegetation found on the site:
deciduous tree: alder, maple, aspen, other
evergreen tree: fir, cedar, pine, other
shrubs
grass
pasture
crop or grain
wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
water plants: water lily, eel grass, milfoil, other
other types of vegetation
b. What kind and amount of vegetation will be removed or altered?
C. List threatened or endangered species known to be on or near the site.
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance
vegetation on the site, if any:
- 5 - 06/09
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\envchlst.doc
5. ANIMALS
a. Circle any birds and animals, which have been observed on or near the site or are known
to be on or near the site:
Birds: hawk, heron, eagle, songbirds, other
Mammals: deer, bear, elk, beaver, other
Fish: bass, salmon, trout, herring, shellfish, other
b. List any threatened or endangered species known to be on or near the site.
C. Is the site part of a migration route? If so, explain
d. Proposed measures to preserve or enhance wildlife, if any:
6. ENERGY AND NATURAL RESOURCES
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet
the completed project's energy needs? Describe whether it will be used for heating,
manufacturing, etc.
b. Would your project affect the potential use of solar energy by adjacent properties? If so,
generally describe.
C. What kinds of energy conservation features are included in the plans of this proposal?
List other proposed measures to reduce or control energy impacts, if any:
7. ENVIRONMENTAL HEALTH
a. Are there any environmental health hazards, including exposure to toxic chemicals,
risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this
proposal? If so, describe.
1) Describe special emergency services that might be required.
2) Proposed measures to reduce or control environmental health hazards, if any:
- 6 - 06/09
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\envchlst.doc
b. Noise
1) What types of noise exist in the area which may affect your project (for example: traffic,
equipment, operation, other)?
2) What types and levels of noise would be created by or associated with the project on a
short-term or a long-term basis (for example: traffic, construction, operation, other)?
Indicate what hours noise would come from the site.
3) Proposed measures to reduce or control noise impacts, if any:
8. LAND AND SHORELINE USE
a. What is the current use of the site and adjacent properties?
b. Has the site been used for agriculture? If so, describe.
C. Describe any structures on the site.
d. Will any structures be demolished? If so, what?
e. What is the current zoning classification of the site?
f. What is the current comprehensive plan designation of the site?
g. If applicable, what is the current shoreline master program designation of the site?
h. Has any part of the site been classified as an "environmentally sensitive" area? If so,
specify.
i. Approximately how many people would reside or work in the completed project?
- 7 - 06/09
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\envchlst.doc
j. Approximately how many people would the completed project displace?
k. Proposed measures to avoid or reduce displacement impacts, if any:
I. Proposed measures to ensure the proposal is compatible with existing and projected
land uses and plans, if any:
9. HOUSING
a. Approximately how many units would be provided, if any? Indicate whether high, middle,
or low-income housing.
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low-income housing.
C. Proposed measures to reduce or control housing impacts, if any:
10. AESTHETICS
a. What is the tallest height of any proposed structure(s), not including antennas; what is
the principal exterior building material(s) proposed.
b. What views in the immediate vicinity would be altered or obstructed?
C. Proposed measures to reduce or control aesthetic impacts, if any:
11. LIGHT AND GLARE
a. What type of light or glare will the proposal produce? What time of day would it mainly
occur?
b. Could light or glare from the finished project be a safety hazard or interfere with views?
- g - 06/09
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\envchlst.doc
C. What existing off -site sources of light or glare may affect your proposal?
d. Proposed measures to reduce or control light and glare impacts, if any:
12. RECREATION
a. What designated and informal recreational opportunities are in the immediate vicinity?
b. Would the proposed project displace any existing recreational uses? If so, describe.
C. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any:
13. HISTORIC AND CULTURAL PRESERVATION
a. Are there any places or objects listed on, or proposed for, national state, or local
preservation registers known to be on or next to the site? If so, generally describe.
b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or
cultural importance known to be on or next to the site.
C. Proposed measures to reduce or control impacts, if any:
14. TRANSPORTATION
a. Identify public streets and highways serving the site, and describe proposed access to
the existing street system. Show on site plans, if any.
b. Is site currently served by public transit? If not, what is the approximate distance to the
nearest transit stop?
C. How many parking spaces would the completed project have? How many would the
project eliminate?
- 9 - 06/09
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\envchlst.doc
d. Will the proposal require any new roads or streets, or improvements to existing roads or
streets, not including driveways? If so, generally describe (indicate whether public or
private?
e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation?
If so, generally describe.
f. How many vehicular trips per day would be generated by the completed project? If
known, indicate when peak volumes would occur.
g. Proposed measures to reduce or control transportation impacts, if any:
15. PUBLIC SERVICES
a. Would the project result in an increased need for public services (for example: fire
protection, police protection, health care, schools, other)? If so, generally describe.
b. Proposed measures to reduce or control direct impacts on public services, if any.
16. UTILITIES
a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service,
telephone, sanitary sewer, septic system, other.
b. Describe the utilities that are proposed for the project, the utility providing the service,
and the general construction activities on the site or in the immediate vicinity which might
be needed.
C. SIGNATURE
I, the undersigned, declare under penalty of perjury under the laws of the State of Washington
that to the best of my knowledge the above information is true, correct, and complete. It is
understood that the lead agency may withdraw any declaration of non -significance that it might
issue in reliance upon this checklist should there be any willful misrepresentation or willful lack of
full disclosure on my part.
Proponent Signature:
Name Printed:
Date:
-10-
H:10ED\Data\Forms-Templates\self-Help Handouts\Planning\envchlst.doc
06ios
D. SUPPLEMENTAL SHEETS FOR NONPROJECT ACTIONS
(These sheets should only be used for actions involving decisions on policies, plans and
programs. You do not need to fill out these sheets for project actions.)
Because these questions are very general, it may be helpful to read them in conjunction with the
list of the elements of the environment.
When answering these questions, be aware of the extent the proposal, or the types of activities
likely to result from the proposal, would affect the item at a greater intensity or at a faster rate
than if the proposal were not implemented. Respond briefly and in general terms.
How would the proposal be likely to increase discharge to water; emissions to air; production,
storage, or release of toxic or hazardous substances; or production of noise?
Proposed measures to avoid or reduce such increases are:
2. How would the proposal be likely to affect plants, animals, fish, or marine life?
Proposed measures to protect or conserve plants, animals, fish, or marine life are:
3. How would the proposal be likely to deplete energy or natural resources?
Proposed measures to protect or conserve energy and natural resources are:
4. How would the proposal be likely to use or affect environmentally sensitive areas or areas
designated (or eligible or under study) for governmental protection; such as parks, wilderness,
wild and scenic rivers, threatened or endangered species habitat, historic or cultural sites,
wetlands, flood plains, or prime farmlands?
Proposed measures to protect such resources or to avoid or reduce impacts are:
5. How would the proposal be likely to affect land and shoreline use, including whether it would
allow or encourage land or shoreline uses incompatible with existing plans?
Proposed measures to avoid or reduce shoreline and land use impacts are:
06109
H:10ED\Data\Forms-Templates\Self-Help Handouts\Planning\envchlst.doc
How would the proposal be likely to increase demands on transportation or public services and
utilities?
Proposed measures to reduce or respond to such demand(s) are:
Identify, if possible, whether the proposal may conflict with local, state, or federal laws or
requirements for the protection of the environment.
SIGNATURE
I, the undersigned, declare under penalty of perjury under the laws of the State of Washington
that to the best of my knowledge the above information is true, correct, and complete. It is
understood that the lead agency may withdraw any declaration of non -significance that it might
issue in reliance upon this checklist should there be any willful misrepresentation or willful lack of
full disclosure on my part.
Proponent Signature:
Name Printed:
Date:
-12-
06/09
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\envchlst.doc
PLANNING DIVISION
WAIVER OF SUBMITTAL REQUIREMENTS
FOR LAND USE APPLICATIONS
This requirement may be waived by:
1. Property Services PROJECT NAME:
2. Public Works Plan Review
3. Building DATE:
4. Planning
H \CED\Data\Forms-Templates\Self-Help Handouts\Planning\waiverofsubmittalregsxls 06/09
PLANNING DIVISION
WAIVER OF SUBMITTAL REQUIREMENTS
FOR LAND USE APPLICATIONS
Traffic Study 2
Tree;Cutfng/Land Clearing Plan
Urban Design Regulations Analysis 4
Utilities Plan, Generalized 2
Wetlands Mitigation Plan, Final 4
Wetlands Mftigation;Plan, Preliminary 4
Wetlands Report/Delineation 4
Wireless:
Applicant Agreement Statement 2 AND 3
Inventory of Existing Sites 2 AND 3
Lease Agreement, Draft 2 AND 3
Map of Existing Site Conditions 2 AND 3
Map of View Area 2 AND 3
PhotosimulationS 2 AND 3
This requirement may be waived by:
1. Property Services PROJECT NAME:
2. Public Works Plan Review
3. Building DATE:
4. Planning
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\waiverofsubmittairegs.xls 06/09
PUBLIC WORKS DEPARTMENT �(6City of
8
��0�
M E M O R A N D U M
DATE: May 24, 2010
TO: Mark Peterson, Fire Chief
Mike Stenhouse, Maintenance Services Director
Richard Marshall, Maintenance Manager
Jim Seitz, Transportation Planning Supervisor
Neil Watts, Development Services Director
Abdou) Gafour, Water Utility System Engineering Supervisor
Dave Christensen, Sewer Utility System Engineering Supervisor
Ron Straka, Surface Water Utility Engineering Supervisor
FROM: Steve Lee, Surface Water Engineer (0205)
SUBJECT: Review of 35% Lake Washington Boulevard North Storm and
Water System Improvement Project (Fronting Hawks Landing)
Please distribute, review and provide comments on the 35% plans for the above
referenced project. We are about to submit for SEPA after gaining easement and road
dedication approvals, but wanted to get City technical comments back by the end of
May in order to expedite all comments together for the next plan revision.
Please return the redlined comments back to Steve Lee, 5th Floor Public Works
Department by May 31s2.
Thank you.
Attachments 51�lwVe
AbE ow1,�4 ao 416el5e P10ys e
143 -6 re vt" , L>a. k Q�amid
4V reA.,lue"I�
st ��f�r S Hvt v
Ap" 5-kgwl K ca A I zya N f -001 Ga ";J1
2n �,ew A v� f aK • l k
i� � �, dsdewa .
604- "4 1,
1116/2010
HAFile Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-3531 Lake Washington Blvd -
Hawks Landing\1010 Corres Consult\InsMemoRM-Nov2009.doc\STP
PUBLIC WORKS DEPARTMENT p City of
M E M O R A N D U M
DATE: May 24, 2010
TO: Mark Peterson, Fire Chief
Mike Stenhouse, Maintenance Services Director
Richard Marshall, Maintenance Manager
Jim Seitz, Transportation Planning Supervisor
Neil Watts, Development Services Director
Abdoul Gafour, Water Utility System Engineering Supervisor
Dave Christensen, Sewer Utility System Engineering Supervisor
Ron Straka, Surface Water Utility Engineering Supervisor
FROM: Steve Lee, Surface Water Engineer (x7205)
--?J-L—
SUBJECT: Review of 35% Lake Washington Boulevard North Storm and
Water System Improvement Project (Fronting Hawks Landing)
Please distribute, review and provide comments on the 35% plans for the above
referenced project. We are about to submit for SEPA after gaining easement and road
dedication approvals, but wanted to get City technical comments back by the end of
May in order to expedite all comments together for the next plan revision.
Please return the redlined comments back to Steve Lee, 5th Floor Public Works
Department by May 315t
Thank you.
Attachments `
HAFile Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-3531 Lake Washington Blvd -
Hawks Landing\1010 Corres Consult\InsMemoPM-Nov2009.doc\STP