HomeMy WebLinkAboutWWP273082 (2)ACORD CERTIFICATE OF LIABILITY INSURANCE DATFEB 2603 )
TM.
PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
MICHAEL J. HALL & COMPANY ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
19578 10TH AVENUE N.E. HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
POULSBO WA 98370 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
PHONE: (360)598-3700
FAX: (360) 598-3703 „ I u. n, A-- INSURERS AFFORDING COVERAGE NAIL #
INSURED INSURER A: HARTFORD FIRE INSURANCE COMPANY
PENHALLEGON ASSOCIATES CONSULTING ENGINEERS INSURER B: CNA INSURANCE COMPANY
INC
TARGET SURVEYORS INSURER C:
750 SIXTH STREET SOUTH SUITE 200 I INSURER D:
KIRKLAND WA 98033 INSURER E:
!`n\/C D A 1 _ CC
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSF
LTR
TYPE OF INSURANCE
POLICY NUMBER
I
POLICY EFFECTIVE
DATE 1MMfDDfYYI
POLICY EXPIRATION
DATE MMIDD
LIMITS
GENERAL LIABILITY
I 52SBADE5745
APR 27 02
APR 27 03
EACH OCCURRENCE
$ 2,000,000
DAMAGE TO RENTED
PR MISES Ee 000urence
$ 300,000
X COMMERCIAL GENERAL LIABILITY
CLAIMS MADE I� OCCUR
MED. EXP (Any One Person)
$ 10,000
A
PERSONAL & ADV INJURY
$ 2,000,000
GENERAL AGGREGATE
$ 4,000,000
GEN'L AGGREGATE LIMIT APPLIES PER:
PRODUCTS-COMP/OP AGG.
$ 4,000,000
POLICY
AUTOMOBILE
LIABILITY
ANY AUTO
I 52SBADE5745
APR 27 02
APR 27 03
COMBINED SINGLE LIMIT
• (Ea accident)
i$ 1,000,000
ALL OWNED AUTOS
BODILY INJURY
A
SCHEDULED AUTOS
��ppmm��
(Per person)
$ 0
X
BODILY INJURY
(Per accident)
$ O
HIRED AUTOS
NON -OWNED AUTOS
�
I
I(f7/�e 0
ier,
2003
R
X
PROPERTY DAMAGE
$ 0
GARAGE LIABILITY
I
STEMS 4
AUTO ONLY - EA ACCIDENT
$ 0
OTHER THAN EA ACC
AUTO ONLY:
AGG
$ _ _ 0
$ 0
ANY AUTO
i
EXCESS / UMBERELLA LIABILITY
52SBADE5745
APR 27 02 I
APR 27 03
EACH OCCURRENCE
�$ 1,000,000
X OCCUR CLAIMS MADE
is 1,000,000
AGGREGATE
A
o I$
0
DEDUCTIBLE
0
$ 0
RETENTION $ 10,000
0 Is
0
A
WORKERS COMPENSATION AND
EMPLOYERS' LIABILITY
ANY PROPRIETOR/PARTNER/EXECUTIVE
52SBADE5745
APR 27 02
APR 27 03
X TORYTLIMITS I OTHER
E.L. EACH ACCIDENT
$ 1,000,000
E.L. DISEASE -EA EMPLOYEE IS
-
1,000,000
OFFICERfMAMBER EXCLUDED?
If yeaIiescribe under
,
SPECIAL PROVISIONS below I
I
E.L. DISEASE -POLICY LIMIT •
----
S 1,000,000
OTHER: j
PRA 11 399 75 87 1
APR 27 01
APR 27 04
$1,000,000 EACH CLAIM
B
PROFESSIONAL LIABILITY
CLAIMS MADE FORM
$1,000,000 AGGREGATE
RETRO DATE: 4/27/92
DESCRIPTION OF OPERATION S/LOCATIONNEHICLES/EXCLUSIONS ADDED ENDORSEMENT/ SPECIAL PROVISIONS
PROJECT: EARLINGTON SEWER REPLACEMENT
THE CERTIFICATE HOLDER IS ADDITIONAL INSURED ON THE GENERAL LIABILITY POLICY AS RESPECTS WORK DONE BY, OR ON
BEHALF OF, THE NAMED INSURED. SEE ATTACHED
r`CDTICIf'ATC Ur'll IOCD I ADDITIONAL INSIIRFD• INSIIRFR I FTTFR• /^Aunci I ATIA\I
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED, OR MATERIALLY
CHANGED, BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL
MAIL 45 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT.
CITY OF RENTON
1055 SOUTH GRADY WAY
RENTON, WA 98055
AUTHORIZED REPRESENTATIVE
Attention: MICHAEL BENOIT
ACORD 25 (2001/08) Certificate # 19436 ASHLEY HURD
POLICY NUMBER: 52SBADE5745 COMMERCIAL GENERAL LIABILITY
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
ADDITIONAL INSURED -OWNERS, LESSEES OR
CONTRACTORS (Form B)
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY
SCHEDULE
Name of Person or Organization; CITY OF RENTON
1055 SOUTH GRADY WAY
RENTON, WA 98055
(If no entry appears above. information required to complete this endorsement will be shown in the
Declarations as applicable to this endorsement.)
WHO IS AN INSURED (Section II) is amended to include as an insured the person or organization
shown in the Schedule, but only with respect to liability arising out of "your work' for that insured by
or for you
CG 20 10 11 85 Copyright. Insurance Services Office, Inc., 1984
Certificate # 19436
CITY OF RENTON
•p�N�� HUMAN RESOURCES & RISK MANAGEMENT
DEPARTMENT
MEMORANDUM
RECEIVED
DATE: February 28, 2003 MAR - 4 2003
TO: Mik it, Utility Systems CITY OF RENTON
UTILITY SYSTEMS
FROM: Webby, HR&RM Administrator
SUBJECT: Insurance Review/ Penhallegon Associates Consulting Engineers, Inc.
Earlington Sewer Replacement
I have reviewed the certificate of insurance for the above -mentioned contract. The insurance
coverage, provided for this contract, meets the City's risk management requirements.
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
MEMORANDUM
DATE: February 27, 2003
TO: Mike Webby, HR & Rick Management Administrator
FROM: Mike Benoit iZ
SUBJECT: Earlington Sewer Replacement / Rehabilitation
Survey Contract
Please review the attached consultant contract agreement for insurance requirements. A response
by March 6, 2003 would be appreciated. If you have any questions, please contact me at Ext.
7206.
W:\WWP-27-3082 Earlington Sewer Repl PH I\Webby01.doc\mab
SURVEYING
SERVICES AGREEMENT
THIS AGREEMENT, made and entered into on this , day of , 20 , by and between the
CITY OF RENTON, WASHINGTON, A MUNICIPAL CORPORATION HEREINAFTER CALLED THE "CITY,"
and the consulting firm Penhallegon Associates Consulting Engineers, Inc. whose address is,
750 Sixth Street South, Kirkland, WA 98033 at which work will be available for inspection, hereinafter called the
"SURVEYOR."
PROJECT NAME: Earlington Sanitary Sewer Replacement / Rehabilitation
WHEREAS, the City has not sufficient qualified engineering employees to provide surveying services within a
reasonable time and the City deems it advisable and is desirous of engaging the professional services and assistance
of a qualified professional surveying firm to do the necessary field surveying work for Public Works projects and the
maintenance of the City's horizontal and vertical control, and
WHEREAS, the Surveyor has represented and by entering into this Agreement now represents, that it is in full
compliance with the statutes of the State of Washington for registration of professional land surveyor, has a current
valid corporate certificate from the State of Washington or has a valid assumed name filing with the Secretary of
State and that all personnel to be assigned to the work required under this Agreement are fully qualified to perform
the work to which they will be assigned in a competent and professional manner, and that sufficient qualified
personnel are on staff or readily available to staff this Agreement.
WHEREAS, the Surveyor has indicated that it desires to do the work set forth in the Agreement upon the terms and
conditions set forth below.
NOW THEREFORE, in consideration of the terms, conditions, covenants and performances contained herein below,
the parties hereto agree as follows:
OBJECTIVES AND SCOPE OF WORK
The objective of this Agreement is to provide land surveying services for the various departments which require
such services during the planning, design and/or construction of City of Renton projects and for the development
and maintenance of the City's maps.. The scope of work shall include all services necessary to accomplish the work
and shall detail the documents to be provided as agreed to under Scopes of Work authorized during the duration of
this Agreement.
The Surveyor shall furnish, and hereby warrants that it has, the necessary equipment, materials, and professionally
trained and experienced personnel to facilitate completion of the work described in Exhibit A, Scope of Work,
which is attached hereto and incorporated into this Agreement as though fully set forth herein.
The work shall be verified for accuracy and completeness by the Consultant. The Surveyor will be held responsible
for the accuracy and completeness of the work, even though the work has been accepted
The Surveyor shall perform all work described in this Agreement and accompanying scopes of work to conform with
the policies and standards set forth in Section H.
wAwwp-27-3082 earlington sewer repl ph i\survey contract.doc\ mab I FRM- Q7.Cnr P.,nr rtnt/hh
II
DESIGN CRITERIA
The City will designate the basic premises and criteria for the work needed. Reports and plans, to the extent
feasible, shall be developed in accordance with the latest edition and amendments of local and State regulations,
guidelines, and specifications, including, but not limited to the following:
1. Draft GeoSpatial Positioning Accuracy Standards for the National Spatial Data Infrastructure by the
Federal Geographic Data Subcommittee, December 1996.
2. All pertinent Washington State legislation, e.g. Chapter 58 of the Revised Code of Washington (RCW).
3. All pertinent sections of the Washington State Administrative Code (WAC), e.g. Chapters 332 WAC.
4. City of Renton Survey Specifications as set forth in Section 1-11 of the City of Renton Supplemental
Specifications for the 1997 Standard Specifications for Road, Bridge, and Municipal Construction,
adopted May 19, 1997.
III
ITEMS TO BE FURNISHED TO THE CONSULTANT
BY THE CITY
The City will furnish the Surveyor copies of documents which are available to the City that will facilitate the
preparation of the plans, studies, specifications, and estimates within the limits of the assigned work.
All other records needed for the study must be obtained by the Surveyor. The Surveyor will coordinate with other
available sources to obtain data or records available to those agencies. The Surveyor shall be responsible for this
and any other data collection. The Surveyor shall be responsible for the verification of existing records to insure
they represent the accurate and current field conditions. Should field studies be needed, the Surveyor will perform
such work. The City will not be obligated to perform any such field studies.
IV
OWNERSHIP OF PRODUCTS AND
DOCUMENTS TO BE FURNISHED BY THE CONSULTANT
Documents, exhibits or other presentations for the work covered by this Agreement shall be furnished by the
Surveyor to the City upon completion of the various phases of the work. All such material, including working
documents, notes, maps, drawings, photographs, photographic negatives, etc. used in the Scope of Work, shall
become and remain the property of the City and may be used by it without restriction; except that, any use of such
documents by the City not directly related to the Scope of Work pursuant to which the documents were prepared by
the Surveyor shall be without any liability whatsoever to the Surveyor.
Where possible and feasible all written documents and products shall be printed on recycled paper. Final
documents, and interim drafts as feasible, will be printed on both sides of the recycled paper.
V
TIME OF BEGINNING AND COMPLETION
This basic agreement shall be in effect for twelve (12) months from the date of formal acceptance by the City. This
agreement may be extended for a maximum of three (3) years, upon agreement by both parties and written
authorization by the City. The Surveyor shall not begin work under the terms of this Agreement until authorized in
writing by the City by an executed Scope of Work. The time for completion of work performed under this
Agreement shall be specified in the Authorized Scope of Work and as authorized in writing. If this contract would
expire prior to the completion date of any Scope of Work, then this contract shall be automatically extended to the
termination date of the Scope of Work.
w:\wwp-27-3082 earlington sewer repl ph i\survey contract.doc\ mab 2 FRM 07..0—evnr rint/hh
Established completion time shall not be extended because of any delays attributable to the Surveyor, but may be
extended by the City in the event of a delay attributable to the City or because of a delay caused by an act of God or
governmental actions or other conditions beyond the control of the Surveyor. A supplemental agreement issued by
the City is required to extend the established time.
Delays attributable to or caused by one of the parties hereto amounting to 30 days or more affecting the completion
of the work may be considered a cause for re negotiation or termination of this Agreement by the other party.
VI
PAYMENT
The Surveyor shall be paid by the City for completed work for services rendered under this Agreement as provided
hereinafter. Such payment shall be full compensation for work performed or services rendered and for all labor,
materials, supplies, equipment, and incidentals necessary to complete the work. All billings for compensation for
work performed under this Agreement will list actual time (days and/or hours) and dates during which the work was
performed and the compensation shall be figured using the rates in Exhibit A.
Time & Materials Billing
Payment for work accomplished shall be on the basis of the Surveyor's hourly billing rate per crew or man hours as
appropriate plus material expenses. It is assumed that the billing rate for personnel provided covers the overhead
and profit margins for the firm. No payment will be made for overhead or profit beyond the rates established in
Exhibit A.
1. The billing rates should cover the salary expense for professional and technical personnel and principals
for the time they are productively engaged in the work necessary to fulfill the terms of this Agreement.
The billing rates are set forth in the attached Exhibit "A" and by this reference made a part of this
Agreement. The billing rates may be updated annually by written approval of the
Planning/Building/Public Works Administrator.
2. The material costs are those costs directly incurred in fulfilling the terms of this Agreement, including,
but not limited to travel, reproduction, telephone, supplies, and fees of outside consultants. The material
costs will be established for each Scope of Work which when executed will become a part of this
Agreement. Billings for any material costs shall be supported by copies of original bills or invoices.
Reimbursement for outside consultants and services shall be no greater than 1.10 times the invoiced
amount.
3. The maximum amount payable for completion of all work under this Agreement on a time and materials
basis is determined by the total of Authorized Scope of Work as shown in Exhibit "A."
4. Progress payments may be claimed monthly for time and materials actually incurred to date as supported
by detailed statements. Final payment of any balance due the Surveyor of the gross amount earned per
Scope of Work will be made promptly upon its verification by the City after completion and acceptance
by the City of the work for each Scope of Work under this Agreement. Acceptance, by the Surveyor of
final payment on the Scope of Work shall constitute full and final satisfaction of all amounts due or
claimed to be due, for the specific Scope of Work.
Payment for extra work performed under this Agreement shall be paid as agreed to by the parties hereto in writing at
the time extra work is authorized. (Section VIH "EXTRA WORK").
A short narrative progress report shall accompany each voucher for progress payment. The report shall include
discussion of any problems and potential causes for delay.
To provide a means of verifying the invoiced time for consultant employees and material expenses, the City may
conduct employee interviews. Time for the interviews can be billed at normal billing rates.
w:\wwp-27-3082 earlington sewer repl ph Asurvey contract.doc\ mab 3 FRM• 97.Cmvevnr dnt/hh
Acceptance of such final payment by the Surveyor shall constitute a release of all claims of any nature, related to,the
specific Scope of Work, which the Surveyor may have against the City unless such claims are specifically reserved
in writing and transmitted to the City by the Surveyor prior to its acceptance. Said final payment shall not, however,
be a bar to any claims that the City may have against the Surveyor or to any remedies the City may pursue with
respect to such claims.
The Surveyor and its subconsultants shall keep available for inspection, by the City, for a period of three years after
final payment, the cost records and accounts pertaining to this Agreement and all items related to, or bearing upon,
these records. If any litigation, claim or audit is started before the expiration of the three-year retention period, the
records shall be retained until all litigation, claims or audit findings involving the records have been resolved. The
three-year retention period starts when the Surveyor receives final payment.
VII
CHANGES IN WORK
The Surveyor shall make all such revisions and changes in the completed work for each Scope of Work as are
necessary to correct mistakes and blunders appearing therein, when required to do so by the City, without additional
compensation.
Should the City find it desirable for its own purposes to have previously satisfactorily completed work or parts
thereof revised, the Surveyor shall make such revisions, if requested and as directed by the City in writing. This
work shall be considered as Extra Work and will be paid for as provided in Section VIE.
VIE
EXTRA WORK
The City may desire to have the Surveyor perform work or render services in connection with a Scope of Work
Assignment in addition to or other than work provided for by the expressed intent of the Scope of Work. Such work
will be considered as Extra Work and will be specified in a written supplement to the Scope of Work which will set
forth the nature and scope thereof. Work under a supplemental Scope of Work shall not proceed until authorized in
writing by the City. Any dispute as to whether work is Extra Work or work already covered under a Scope of Work
shall be resolved before the work is undertaken.
IX
EMPLOYMENT
The Surveyor warrants that it has not employed or retained any company or person, other than a bona fide employee
working solely for the Surveyor, to solicit or secure this contract and that he has not paid or agreed to pay any
company or person, other than a bona fide employee working solely for the Surveyor, any fee, commission,
percentage, brokerage fee, gifts or any other consideration, contingent upon or resulting from the award or making of
this contract. For breach or violation of this warranty, the City shall have the right to annul this Agreement without
liability, or in its discretion to deduct from the Agreement price or consideration or otherwise recover, the full
amount of such fee, commission, percentage, brokerage fee, gift or contingent fee.
Any and all employees of the Surveyor, while engaged in the performance of any work or services required by the
Surveyor under this Agreement, shall be considered employees of the Surveyor only and not of the City and any and
all claims that may or might arise under the Workman's Compensation Act on behalf of said employees, while so
engaged and any and all claims made by a third party as a consequence of any negligent act or omission on the part
of the Surveyor's employees, while so engaged on any of the work or services provided to be rendered herein, shall
be the sole obligation and responsibility of the Surveyor.
The Surveyor shall not engage, on a full or part-time basis, or other basis, during the period of the contract, any
professional or technical personnel who are, or have been at any time during the period of this contract, in the
employ of the City except regularly retired employees, without written consent of the public employer of such
person.
If during the time period of this agreement, the Surveyor finds it necessary to increase its professional, technical, or
clerical staff as a result of this work, the Surveyor will actively solicit minorities through their advertisement and
interview process.
w:\wwp-27-3082 earlington sewer repl ph i\survey contract.doc\ mab 4 FRM QZGrcvevnr dnt/hh
X
NONDISCRIMINATION
The Surveyor agrees not to discriminate against any client, employee or applicant for employment or for services
because of race, creed, color, national origin, marital status, sex, age or handicap except for a bona fide occupational
qualification with regard to, but not limited to the following: employment upgrading; demotion or transfer;
recruitment or any recruitment advertising; layoff or terminations; rates of pay or other forms of compensation;
selection for training; rendition of services. The Surveyor understands and agrees that if it violates this Non -
Discrimination provision, this Agreement may be terminated by the City and further that the Surveyor shall be
barred from performing any services for the City now or in the future, unless a showing is made satisfactory to the
City that discriminatory practices have terminated and that recurrence of such action is unlikely.
XI
TERMINATION OF AGREEMENT
A. The City reserves the right to terminate this Agreement at any time upon not less than ten (10) days
written notice to the Surveyor, subject to the City's obligation to pay Surveyor in accordance with
subparagraphs C and D below.
B. In the event of the death of a member, partner or officer of the Surveyor, or any of its supervisory
personnel assigned to the project, the surviving members of the Surveyor hereby agree to complete the
work under the terms of this Agreement, if requested to do so by the City. This section shall not be a bar
to re -negotiations of this Agreement between surviving members of the Surveyor and the City, if the City
so chooses.
In the event of the death of any of the parties listed in the previous paragraph, should the surviving
members of the Surveyor, with the City's concurrence, desire to terminate this Agreement, payment shall
be made as set forth in Subsection C of this section.
C. In the event this Agreement is terminated by the City other than for fault on the part of the Surveyor, a
final payment shall be made to the Surveyor for actual time and material expenses for the work complete
at the time of termination of the Agreement. In addition, the Surveyor shall be paid on the same basis as
above for any authorized extra work completed. No payment shall be made for any work completed after
ten (10) days following receipt by the Surveyor of the Notice to Terminate, except for work which may
be required to complete checking of finalized work and record surveys as required by Washington State
law. If the accumulated payment made to the Surveyor prior to Notice of Termination exceeds the total
amount that would be due as set forth herein above, then no final payment shall be due and the Surveyor
shall immediately reimburse the City for any excess paid.
D. In the event the services of the Surveyor are terminated by the City for fault on the part of the Surveyor,
the above stated formula for payment shall not apply. In such an event the amount to be paid shall be
determined by the City with consideration given to the actual costs incurred by the Surveyor in
performing the work to the date of termination, the amount of work originally required which was
satisfactorily completed to date of termination, whether that work is in a form or of a type which is
usable to the City at the time of termination, the cost to the City of employing another firm to complete
the work required and the time which may be required to do so, and other factors which affect the value
to the City of the work performed at the time of termination. Under no circumstances shall payment
made under this subsection exceed the amount which would have been made if the formula set forth in
subsection C above had been applied.
E. In the event this Agreement is terminated prior to completion of the work, the original copies of all
Engineering plans, reports and documents prepared by the Surveyor prior to termination shall become the
property of the City for its use without restriction. Such unrestricted use not occurring as a part of this
project, shall be without liability or legal exposure to the Surveyor.
w:\wwp-27-3082 earlington sewer repl ph i\survey contract.doc\ mab 5 FRM- Q7Rnrvevnr dnt/hh
F. Payment for any part of the work by the City shall not constitute a waiver by the City of any remedies of
any type it may have against the Surveyor for any breach of this Agreement by the Surveyor, or for
failure of the Surveyor to perform work required of it by the City. Forbearance of any rights under the
Agreement will not constitute waiver of entitlement to exercise those rights with respect to any future act
or omission by the Surveyor.
XII
DISPUTES
Any dispute concerning questions of facts in connection with work not disposed of by agreement between the
Surveyor and the City shall be referred for determination to the Director of Planning/Building/Public Works or
his/her successors and delegees, whose decision in the matter shall be final and conclusive on the parties to this
Agreement.
In the event that either party is required to institute legal action or proceedings to enforce any of its rights in this
Agreement, both parties agree that any such action shall be brought in the Superior Court of the State of
Washington, situated in King County.
XIII
LEGAL RELATIONS
The Surveyor shall comply with all Federal Government, State and local laws and ordinances applicable to the work
to be done under this Agreement. This contract shall be interpreted and construed in accordance with the laws of
Washington.
The Surveyor agrees to indemnify, defend and hold the City and its officers and employees harmless from and shall
process and defend at its own expense all claims, demands or suits at law or equity arising in whole or part from the
Surveyor's negligent acts, errors, or omissions under this Agreement provided that nothing herein shall require the
Surveyor to indemnify the City against and hold harmless the City from claims, demands or suits based upon the
conduct of the City, its officers or employees and provided further that if the claims or suits are caused by or result
from the concurrent negligence of (a) the Surveyor's agents or employees and (b) the City, its agents, officers and
employees, this provision with respect to claims or suits based upon such concurrent negligence shall be valid and
enforceable only to the extent of the Surveyor's negligence or the negligence of the Surveyor's agents or employees
except as limited below.
The Surveyor shall secure general liability, property damage, auto liability, and professional liability coverage in the
amount of $1.0 million, with a General Aggregate in the amount of $2 million, unless waived or reduced by the City.
The Consultant shall submit a completed City of Renton Insurance Information Form, and the Standard Acord. The
City of Renton shall be named as an "additional insured" on all contracts/projects. Surveyor shall furnish copies of
the declarations pages of relevant insurance policies to the City prior to execution of any Scope of Work. The
Certification and Declaration page(s) shall be in a form as approved by the City. If the City's Risk Manager has the
Declaration page(s) on file from a previous contract and no changes in insurance coverage has occurred, only the
Certification Form will be required.
All coverages provided by the Surveyor shall be in a form, and underwritten by a company acceptable to the City.
The City will normally require carriers to have minimum A.M. Best rating of A XII. The Surveyor shall keep all
required coverages in full force and effect during the life of any Scope of Work, and a minimum of thirty days'
notice shall be given to the City prior to the cancellation of any policy.
The Surveyors's relation to the City shall be at all times as an independent contractor.
XIV
SUBLETTING OR ASSIGNING OF CONTRACTS
The Surveyor shall not sublet or assign any of the work covered by this Agreement without the express consent of
the City.
w:\wwp-27-3082 earlington sewer repl ph i\survey contract.doc\ mab E) FRM Q7Girvrvnr dnt/hh
XV
ENDORSEMENT OF PLANS
The Surveyor shall place their certification on all plans, specifications, estimates or any other engineering data
furnished by them in accordance with RCW 18.43.070.
XVI
COMPLETE AGREEMENT
This document and referenced attachments contain all covenants, stipulations, and provisions agreed upon by the
parties. Later Scope of Works will be in writing and executed and will become part of this agreement. No agent, or
representative of either party has authority to make, and the parties shall not be bound by or be liable for, any
statement, representation, promise, or agreement not set forth herein. No changes, amendments, or modifications of
the terms hereof shall be valid unless reduced to writing and signed by the parties as an amendment to this
Agreement.
The invalidity or unenforceability of any provision in this Agreement shall not affect the other provisions hereof,
and this Agreement shall be construed in all respects as if such invalid or unenforceable provision were omitted.
XVIH
EXECUTION AND ACCEPTANCE
This Agreement may be simultaneously executed in several counterparts, each of which shall be deemed to be an
original having identical legal effect. The Surveyor does hereby ratify and adopt all statements, representations,
warranties, covenants, and agreements contained in the Request for Qualifications, and the supporting materials
submitted by the Surveyor, and does hereby accept the Agreement and agrees to all of the terms and conditions
thereof.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the day and year first above
written.
CONSULTANT
l -- ------� '.L,. , Z10'i
Signature Date
AN1'j'F- C. SYcIAvNO S
type or print name
Title
CITY OF RENTON
Jesse Tanner, Mayor
ATTEST:
Bonnie I. Walton, City Clerk
Date
w:\wwp-27-3082 earlington sewer rep] ph i\survey contract.doc\ mab 7 FRM• 97Rnrvevnr Ant/hh
It is the policy of the City of Renton to promote and provide equal treatment and service to all citizens and to
ensure equal employment opportunity to all persons without regard to race, color, national origin, ethnic
background, gender, marital status, religion, age or disability, when the City of Renton can reasonably
accommodate the disability, of employees and applicants for employment and fair, non-discriminatory
treatment to all citizens. All departments of the City of Renton shall adhere to the following guidelines:
(1) EMPLOYMENT PRACTICES - The City of Renton will ensure all employment related
activities included recruitment, selection, promotion, demotion, training, retention and
separation are conducted in a manner which is based on job -related criteria which does not
discriminate against women, minorities and other protected classes. Human resources
decisions will be in accordance with individual performance, staffing requirements, governing
civil service rules, and labor contract agreements.
(2) COOPERATION WITH HUMAN RIGHTS ORGANIZATIONS - The City of Renton will
cooperate fully with all organizations and commissions organized to promote fair practices
and equal opportunity in employment.
(3) AFFIRMATIVE ACTION PLAN - The City of Renton Affirmative Action Plan and Equal
Employment Program will be maintained and administered to facilitate equitable
representation with the City work force and to assure equal employment opportunity to all. It
shall be the responsibility of elected officials, the Mayor, the Affirmative Action Officer,
department administrators, managers, supervisors, Contract Compliance Officers and all
employees to carry out the policies, guidelines and corrective measures set forth in the
Affirmative Action Plan and Equal Employment Program.
(4) CONTRACTORS' OBLIGATIONS - Contractors, sub -contractors, consultants and
suppliers conducting business with the City of Renton shall affirm and subscribe to the Fair
Practices and Non-discrimination policies set forth by the law and in the City's Affirmative
Action Plan and Equal Employment Program.
Copies of this policy shall be distributed to all City employees, shall appear in all operational documentation
of the City, including bid calls, and shall be prominently displayed in appropriate city facilities.
CONCURRED IN by the City Council of the City of RENTON, Washington, this 7thday of October, 1996.
CITY OF RENTON:
Mayor
,Attest:
City Clerl
RENTON CITY COUNCII.:
Council President
w:\wwp-27-3082 earlington sewer repl ph i\survey contract.doc\ mab 10 FRM: 97Surveyor.dot/bh
AFFIDAVIT OF COMPLIANCE
vn s tJ-i�
( Name of co actor/subconti
by confirms and declares that
I. It is PACE `> policy to offer equal
( Name of contractor/subcontractor/consultant/supplier)
opportunity to all qualified employees and applicants for employment without regard to
the race, creed, color, sex, national origin, age, disability or veteran status.
II. PACE complies with all applicable federal,
( Name of contractor/subcontractor/consultant/supplier)
state and local laws governing non-discrimination in employment.
H. When applicable, '1,ACC will seek out and
( Name of contractor/subcontractor/consultant/supplier)
negotiate with minority and women contractors for the award of
subcontracts.
Print Agent/Representative's Name and Title
l
Agent/Representative's Signature
Instructions: This document MUST be completed by each contractor, subcontractor, consultant and/or supplier.
Include or attach this document(s) with the contract.
wAwwp-27-3082 earlington sewer rep] ph Asurvey contract.doO mab I I FRM: Murveyondot/bh
Penhallegon Associates Consulting Engineers, Inc.
Engineering
Planning
Surveying
February 12, 2003
Michael A. Benoit
City of Renton
1055 South Grady Way
Renton, WA 98055
Re: Request for Survey Services for the Earlington
Sewer Replacement Projecit
Dear Michael:
RECEIVED
FEB 14 2003
CITY OF RENTON
UTILITY SYSTEMS
P03-759/205B
Penhallegon Associates Consulting Engineers, Inc. (PACE) is pleased to present this estimate to
provide Surveying Services for the Earlington Sewer Replacement project based on your letter to
Don Fordney dated January 22, 2003.
Penhallegon Associates Consulting Engineers, Inc., hereinafter referred to as the "Surveyor",
agrees to provide professional services in connection with the Project described herein to the City
of Renton hereinafter referred to as the "Client".
Article L Scope of Services — Topographic Survey
Pu ose: The preparation of a base map for future design.
Area of Coverage: Approximately 15,200 linear feet in length in the Earlington Area of
Renton. Approximately 12,000 feet within street right-of-ways and approximately 3,200 feet
along existing sewer lines outside of street right-of-ways.
Description:
■ All surveying will be tied to City of Renton NAD 83/91 horizontal control points and
NAVD 88 vertical control points. All survey work shall be conducted in accordance with
the City of Renton requirements.
■ An electronic design locate will be ordered.
■ Establish right-of-way, centerlines and boundaries.
■ Set additional Bench Marks at beginning and end of streets, if needed. Maximum distance
between bench marks to be 1000 feet in distance or 100 feet in elevation.
■ Show spot elevations on hard surfaces on a separate layer.
Federal Way Seattle Kirkland
253.568.6500 1601 Second Avenue, Suite 1000 • Seattle WA 98101-3511 425.827.2014
P. 206.441.1855 • F.206.448.7167
Portland 888.723.7853
Michael A. Benoit
City of Renton
Earlington Sewer Replacement
P03-759/205B
February 12, 2003
Page 2
■ Show all data and 10 feet beyond right-of-way lines.
■ Show contour lines at 2-foot intervals.
■ Show all known utilities, note size, type, invert elevations and direction of flow.
■ Show all prominent landmarks.
■ Show front edge of houses, house numbers, property lines and right-of-way lines.
■ Show ground elevations to nearest tenth of a foot at two main house corners with note to
the existence of a basement and approximate measure up to main floor.
■ One print for each street for review purposes. City will prepare plan and profile sheets.
■ Project shall be prepared in AutoCAD version 2000 at a scale of 1"=20'.
■ Two sets of prints will be provided for review, corrections will be made and two sets
provided for final review.
■ Final Product: Disk or CD
Task A. Supervision, research and centerline control survey
Objective: Establish centerline of the streets, set benchmarks and provide project
coordination.
Approach: Recover monuments or set PK nail and aluminum washer or equal at street
intersections. Recover plat and subdivision monuments together with other
available survey control points to establish street intersections for plotting right-of-
ways. Run vertical control and elevate control points for topographic survey
work. Run a level loop through the horizontal control, and set at least one
benchmark at each street intersection and/or as called for in description of the
work.
Task B. Calculations
Objective: Establish coordinates and elevations for control points and fix street intersections
and right-of-way lines.
Approach: Compute traverse closures and coordinates on recovered points.
Task C Field Topographic Survey
Objective: Acquire topographic features for final map compilation.
Approach: Radial topography. Data collect surface utilities and all other topography within
streets and along existing sewers outside right-of-way as shown on attached map.
Prepare sketches and acquire measure downs to inverts of existing utility
structures.
Task D. Mapping
Objective: Preparation of Final Mapping.
Approach: AutoCAD drafting in Release 2000. Check all data for correctness, plot located
and calculated data on base map.
Product: Disk only.
Michael A. Benoit
City of Renton
Earlington Sewer Replacement
Project Assumptions
P03-759/205B
February 12, 2003
Page 3
The following conditions clarify the assumptions and limitations of our scope of services:
• It is assumed that we will be able to obtain permission from the property owners to trim or
cut brush and small trees if necessary. If permission cannot be obtained, where needed, our
ability to perform the field survey as detailed in this scope may be limited.
• For the purpose of this estimate we have assumed the mapping will be limited to the exterior
of the buildings.
Project Exclusions
The following conditions clarify the exclusions from our scope of services:
• Entering manholes or other structures to obtain invert elevations or other dimensions.
• Locating features in or mapping the insides of the buildings.
• Excavating or potholing to locate buried utilities.
Article II. Basic Services Fee
Basic Services compensation for Tasks A, B & C will be on an hourly basis not to exceed
$69,861.00 plus reimbursable expenses of $6,319.20 for a total of $76,180.20.
The hourly rate charges shall be billed using the hourly rates in effect at the time the services are
provided.
The breakdown for the above fees is shown on attachment A.
Article III. Schedule
To be negotiated.
Significant changes in the schedule following negotiations may be cause for request for additional
compensation.
Article IV. Terms
A. This letter shall serve as a contract unless it is included in another written agreement.
B. The Owner shall make payment for services monthly. The payments shall be in proportion
to the progress of the Surveyor's work.
Michael A. Benoit
P03-759/205B
City of Renton February 12, 2003
Earlington Sewer Replacement Page 4
C. The Owner shall make no deduction from the Surveyor's compensation on account of
penalties, liquidated damages or other sums withheld from the Contractor(s) through no
fault of the Surveyor.
B. The Surveyor shall submit requests for payment monthly on forms provided and in a
manner prescribed by the Owner.
Article V. Compensation for Additional Services and Reimbursable
All additional services shall be authorized in writing prior to performance of the work.
A. Surveyor shall submit monthly requests for payment authorized additional services and
reimbursable expenses.
B. When requesting payment for additional services or reimbursable expenses, the Surveyor
shall submit an itemized billing showing unit cost and quantity of each item billed, and
referencing the specific authorizing document.
C. Additional Services shall be billed on an hourly basis using the hourly rates in effect at the
time the services are provided.
Article VI. Approval
If the above meets with your approval, please sign below and return one copy of this letter to our
office for our files. This scope and fee proposal reflects our understanding of the work at this
time. If you feel we do not accurately understand the project, please do not hesitate to let us
know. We appreciate the opportunity to submit this proposal, and look forward to discussing the
work in more detail with you. Please contact us if you need additional information.
Sincerely,
PENHALLEGON ASSOCIATES
_CONSULTING ENGINEERS, INC.
Don�®rdln,L
PrincSurveyor
Accepted for the City of Renton by:
Authorized Signature Title Date
PACE I I AttachmentA Project Budget Worksheet
Project Name Earlington Sewer Replacement Project Prepared By: EMF
Project #: P03-759 Billing Group #: Location: Earlington Area - Renton, WA Date: 31-Jan-03
Drawing/ Labor Hours by Classification
Project Project Survey Project
Drawing/Task Title Task Manager Engineer Engineer ; CADD Tech ; Manager Surveyor ; Survey Crew: QA/QC Admin Admin Admin Total
A. Research & Control 2 24 40 0.5 66.5
0.0
B. Calculations
4 1
60
0.5
64.5
0.0
C. Field Togographic Survey
40
264 1
305.0
0.0
D. Mapping
260 4
40
0.5
304.5
0.0
0.0
0.0
0.0
0.0
.... ........ .
Total Hours
0.0: 0.0: 0.0: 260.0: 10.0:
164.0:
304.0: 0.0: 2.5: 0.0: 0.0
740.5
Hourly Rate
$0.00 ; $0.00 ; $0.00 ; $73.00 ; $104.00 ;
$88.00 '
$116.00 ' $0.00 ; $58.00 ; $0.00 ; $0.00
Labor Total
$0 ; $0 ; $0 ; $18,980 ; $1,040 ;
$14,432 ;
$35,264 ; $0 ; $145 ; $0 ; $0
.....,. .
DD..::.............................1Q..................100.................. QO.,.,.,......._....Ill).........,OQ...
Expenses
rate/unit
Reimbursable
----------- ..........
Quantity : Cost
Reprographics/Copying
Plotter j
Photo/Video
Mileage $0.35
912; $319,20
Utility Locate Service (APS) $75.00
80: $6,000.00
PerDiem
Total
$6,319.20
$0
Total Project Budge $76,180.20
File: 032058.xls, Fee Worksheet Page 1 of 1 Printed: 2/12/03, 4:11 PM
CITY OF RENTON COUNCIL AGENDA BILL
Al #:
Submitting Data: Planning/Building/Public Works
Dept/Div/Board.. Wastewater Utility
Staff Contact...... Mike Benoit (x-7206)
Subject:
Earlington Sanitary Sewer Replacement Survey
Consultant Contract with Penhallegon Associates
Exhibits:
Consultant Contract
Recommended Action:
Refer to Utilities Committee
Fiscal Impact:
Expenditure Required...
Amount Budgeted.......
Total Project Budget
$76,180.20
$90,000
$1,100,000 (Ph I - 2003)
(approved 2003 appropriation;
SUMMARY OF ACTION:
For Agenda of:
24.2003
Agenda Status
Consent ..............
Public Hearing..
Correspondence..
Ordinance .............
Resolution........... .
Old Business........
New Business.......
Study Sessions......
Information........ .
Approvals:
Legal Dept ......... X
Finance Dept ...... X
Other ...............
Transfer/Amendment....... $0
Revenue Generated......... $0
City Share Total Project..
The Earlington area is one of the areas identified for Sanitary Sewer Main Replacement and
Rehabilitation in the 2003 Capital Improvement Program (CIP). The 2003 CIP estimates a
project expense of $4,400,000, anticipates that the project will begin in 2003, and will be
phased annually with a completion date of 2006.
X
As a first step in the project, we are proposing to have Penhallegon Associates survey the
project area. The cost of the proposed contract is $76,180.20. Approved budget authority for
Sanitary Sewer Main Replacement and Rehabilitation for the year 2003 is $1,200,000, of which
$1,100,000 is earmarked for Earlington.
STAFF RECOMMENDATION:
Staff recommends that Council authorize the Mayor and City Clerk to execute the attached
contract with Penhallegon Associates for survey work associated with the Earlington Sanitary
Sewer Replacement project.
W:\WWP-27-3082 Earlington Sewer Repl PH I\AGENDA BILL PACE.doe\MAB:If
CITY OF RENTON COUNCIL AGENDA BILL rrt� rml�, rrsx;D
Submitting Data: Planning/Building/Public Works
For Agenda of:
Dept/Div/Board.. Wastewater Utility
February 24, 2003
Staff Contact...... Mike Benoit (x-7206)
Agenda Status
Consent .............. X
Public Hearing..
Subject:
Earlington Sanitary Sewer Replacement Survey
Correspondence..
Consultant Contract with Penhallegon Associates
Ordinance .............
Resolution........... .
Old Business........
New Business.......
Exhibits:
Consultant Contract
Study Sessions......
Information........ .
Recommended Action:
Council Concur
Fiscal Impact:
Expenditure Required..
Amount Budgeted.......
Total Project Budget
$76,180.20
$90,000
$1,100, 000 (Ph I - 2003)
(approved 2003 appropriation)
SUMMARY OF ACTION:
Approvals:
Legal Dept......... X
Finance Dept ...... X
Other ...............
Transfer/Amendment....... $0
Revenue Generated......... $0
City Share Total Project..
The Earlington area is one of the areas identified for Sanitary Sewer Main Replacement and
Rehabilitation in the 2003 Capital Improvement Program (CIP). The 2003 CIP estimates a
project expense of $4,400,000, anticipates that the project will begin in 2003, and will be
phased annually with a completion date of 2006.
As a first step in the project, we are proposing to have Penhallegon Associates survey the
project area. The cost of the proposed contract is $76,180.20. Approved budget authority for
Sanitary Sewer Main Replacement and Rehabilitation for the year 2003 is $1,200,000, of which
$1,100,000 is earmarked for Earlington.
STAFF RECOMMENDATION:
Staff recommends that Council authorize the Mayor and City Clerk to execute the attached
contract with Penhallegon Associates for survey work associated with the Earlington Sanitary
Sewer Replacement project.
\\DAEDALUS\SYS2\SHARED\File Sys\WWP - Waste Water\WWP-27-3082 Earlington Sewer Repl PH RAGENDA BILL PACE.doc\MAB:If
SURVEYING
SERVICES AGREEMENT
THIS AGREEMENT, made and entered into on this , day of , 20 , by and between the
CITY OF RENTON, WASHINGTON, A MUNICIPAL CORPORATION HEREINAFTER CALLED THE "CITY,"
and the consulting firm Penhallegon Associates Consulting Engineers, Inc. whose address is,
750 Sixth Street South, Kirkland, WA 98033 at which work will be available for inspection, hereinafter called the
"SURVEYOR."
PROJECT NAME: Earlington Sanitary Sewer Replacement / Rehabilitation
WHEREAS, the City has not sufficient qualified engineering employees to provide surveying services within a
reasonable time and the City deems it advisable and is desirous of engaging the professional services and assistance
of a qualified professional surveying firm to do the necessary field surveying work for Public Works projects and the
maintenance of the City's horizontal and vertical control, and
WHEREAS, the Surveyor has represented and by entering into this Agreement now represents, that it is in full
compliance with the statutes of the State of Washington for registration of professional land surveyor, has a current
valid corporate certificate from the State of Washington or has a valid assumed name filing with the Secretary of
State and that all personnel to be assigned to the work required under this Agreement are fully qualified to perform
the work to which they will be assigned in a competent and professional manner, and that sufficient qualified
personnel are on staff or readily available to staff this Agreement.
WHEREAS, the Surveyor has indicated that it desires to do the work set forth in the Agreement upon the terms and
conditions set forth below.
NOW THEREFORE, in consideration of the terms, conditions, covenants and performances contained herein below,
the parties hereto agree as follows:
OBJECTIVES AND SCOPE OF WORK
The objective of this Agreement is to provide land surveying services for the various departments which require
such services during the planning, design and/or construction of City of Renton projects and for the development
and maintenance of the City's maps.. The scope of work shall include all services necessary to accomplish the work
and shall detail the documents to be provided as agreed to under Scopes of Work authorized during the duration of
this Agreement.
The Surveyor shall furnish, and hereby warrants that it has, the necessary equipment, materials, and professionally
trained and experienced personnel to facilitate completion of the work described in Exhibit A, Scope of Work,
which is attached hereto and incorporated into this Agreement as though fully set forth herein.
The work shall be verified for accuracy and completeness by the Consultant. The Surveyor will be held responsible
for the accuracy and completeness of the work, even though the work has been accepted
The Surveyor shall perform all work described in this Agreement and accompanying scopes of work to conform with
the policies and standards set forth in Section H.
w:\wwp-27-3082 earlington sewer rep] ph Rsurvey contract.doc\ mab ] PRM- 97Girvevnr rint/hh
Hj
DESIGN CRITERIA
The City will designate the basic premises and criteria for the work needed. Reports and plans, to the extent
feasible, shall be developed in accordance with the latest edition and amendments of local and State regulations,
guidelines, and specifications, including, but not limited to the following:
1. Draft GeoSpatial Positioning Accuracy Standards for the National Spatial Data Infrastructure by the
Federal Geographic Data Subcommittee, December 1996.
2. All pertinent Washington State legislation, e.g. Chapter 58 of the Revised Code of Washington (RCW).
3. All pertinent sections of the Washington State Administrative Code (WAC), e.g. Chapters 332 WAC.
4. City of Renton Survey Specifications as set forth in Section 1-11 of the City of Renton Supplemental
Specifications for the 1997 Standard Specifications for Road, Bridge, and Municipal Construction,
adopted May 19, 1997.
ITEMS TO BE FURNISHED TO THE CONSULTANT
BY THE CITY
The City will furnish the Surveyor copies of documents which are available to the City that will facilitate the
preparation of the plans, studies, specifications, and estimates within the limits of the assigned work.
All other records needed for the study must be obtained by the Surveyor. The Surveyor will coordinate with other
available sources to obtain data or records available to those agencies. The Surveyor shall be responsible for this
and any other data collection. The Surveyor shall be responsible for the verification of existing records to insure
they represent the accurate and current field conditions. Should field studies be needed, the Surveyor will perform
such work. The City will not be obligated to perform any such field studies.
ILIVA
OWNERSHIP OF PRODUCTS AND
DOCUMENTS TO BE FURNISHED BY THE CONSULTANT
Documents, exhibits or other presentations for the work covered by this Agreement shall be furnished by the
Surveyor to the City upon completion of the various phases of the work. All such material, including working
documents, notes, maps, drawings, photographs, photographic negatives, etc. used in the Scope of Work, shall
become and remain the property of the City and may be used by it without restriction; except that, any use of such
documents by the City not directly related to the Scope of Work pursuant to which the documents were prepared by
the Surveyor shall be without any liability whatsoever to the Surveyor.
Where possible and feasible all written documents and products shall be printed on recycled paper. Final
documents, and interim drafts as feasible, will be printed on both sides of the recycled paper.
V
TIME OF BEGINNING AND COMPLETION
This basic agreement shall be in effect for twelve (12) months from the date of formal acceptance by the City. This
agreement may be extended for a maximum of three (3) years, upon agreement by both parties and written
authorization by the City. The Surveyor shall not begin work under the terms of this Agreement until authorized in
writing by the City by an executed Scope of Work. The time for completion of work performed under this
Agreement shall be specified in the Authorized Scope of Work and as authorized in writing. If this contract would
expire prior to the completion date of any Scope of Work, then this contract shall be automatically extended to the
termination date of the Scope of Work.
wAwwp-27-3082 earlington sewer repl ph i\survey contract.doc\ mab 2 FRM Q7G rvevnr dm/hh
Established completion time shall not be extended because of any delays attributable to the Surveyor, but may be
extended by the City in the event of a delay attributable to the City or because of a delay caused by an act of God or
governmental actions or other conditions beyond the control of the Surveyor. A supplemental agreement issued by
the City is required to extend the established time.
Delays attributable to or caused by one of the parties hereto amounting to 30 days or more affecting the completion
of the work may be considered a cause for re negotiation or termination of this Agreement by the other party.
VI
PAYMENT
The Surveyor shall be paid by the City for completed work for services rendered under this Agreement as provided
hereinafter. Such payment shall be full compensation for work performed or services rendered and for all labor,
materials, supplies, equipment, and incidentals necessary to complete the work. All billings for compensation for
work performed under this Agreement will list actual time (days and/or hours) and dates during which the work was
performed and the compensation shall be figured using the rates in Exhibit A.
Time & Materials Billing
Payment for work accomplished shall be on the basis of the Surveyor's hourly billing rate per crew or man hours as
appropriate plus material expenses. It is assumed that the billing rate for personnel provided covers the overhead
and profit margins for the firm. No payment will be made for overhead or profit beyond the rates established in
Exhibit A.
1. The billing rates should cover the salary expense for professional and technical personnel and principals
for the time they are productively engaged in the work necessary to fulfill the terms of this Agreement.
The billing rates are set forth in the attached Exhibit "A" and by this reference made a part of this
Agreement. The billing rates may be updated annually by written approval of the
Planning/Building/Public Works Administrator.
2. The material costs are those costs directly incurred in fulfilling the terms of this Agreement, including,
but not limited to travel, reproduction, telephone, supplies, and fees of outside consultants. The material
costs will be established for each Scope of Work which when executed will become a part of this
Agreement. Billings for any material costs shall be supported by copies of original bills or invoices.
Reimbursement for outside consultants and services shall be no greater than 1.10 times the invoiced
amount.
3. The maximum amount payable for completion of all work under this Agreement on a time and materials
basis is determined by the total of Authorized Scope of Work as shown in Exhibit "A."
4. Progress payments may be claimed monthly for time and materials actually incurred to date as supported
by detailed statements. Final payment of any balance due the Surveyor of the gross amount earned per
Scope of Work will be made promptly upon its verification by the City after completion and acceptance
by the City of the work for each Scope of Work under this Agreement. Acceptance, by the Surveyor of
final payment on the Scope of Work shall constitute full and final satisfaction of all amounts due or
claimed to be due, for the specific Scope of Work.
Payment for extra work performed under this Agreement shall be paid as agreed to by the parties hereto in writing at
the time extra work is authorized. (Section VIII "EXTRA WORK").
A short narrative progress report shall accompany each voucher for progress payment. The report shall include
discussion of any problems and potential causes for delay.
To provide a means of verifying the invoiced time for consultant employees and material expenses, the City may
conduct employee interviews. Time for the interviews can be billed at normal billing rates.
w:\wwp-27-3082 earlington sewer repl ph i\survey contract.doc\ mab 3 FRTvf dot/hh
Acceptance of such final payment by the Surveyor shall constitute a release of all claims of any nature, related to the
`specific Scope of Work, which the Surveyor may have against the City unless such claims are specifically reserved
in writing and transmitted to the City by the Surveyor prior to its acceptance. Said final payment shall not, however,
be a bar to any claims that the City may have against the Surveyor or to any remedies the City may pursue with
respect to such claims.
The Surveyor and its subconsultants shall keep available for inspection, by the City, for a period of three years after
final payment, the cost records and accounts pertaining to this Agreement and all items related to, or bearing upon,
these records. If any litigation, claim or audit is started before the expiration of the three-year retention period, the
records shall be retained until all litigation, claims or audit findings involving the records have been resolved. The
three-year retention period starts when the Surveyor receives final payment.
VII
CHANGES IN WORK
The Surveyor shall make all such revisions and changes in the completed work for each Scope of Work as are
necessary to correct mistakes and blunders appearing therein, when required to do so by the City, without additional
compensation.
Should the City find it desirable for its own purposes to have previously satisfactorily completed work or parts
thereof revised, the Surveyor shall make such revisions, if requested and as directed by the City in writing. This
work shall be considered as Extra Work and will be paid for as provided in Section VIII.
VIII
EXTRA WORK
The City may desire to have the Surveyor perform work or render services in connection with a Scope of Work
Assignment in addition to or other than work provided for by the expressed intent of the Scope of Work. Such work
will be considered as Extra Work and will be specified in a written supplement to the Scope of Work which will set
forth the nature and scope thereof. Work under a supplemental Scope of Work shall not proceed until authorized in
writing by the City. Any dispute as to whether work is Extra Work or work already covered under a Scope of Work
shall be resolved before the work is undertaken.
IX
EMPLOYMENT
The Surveyor warrants that it has not employed or retained any company or person, other than a bona fide employee
working solely for the Surveyor, to solicit or secure this contract and that he has not paid or agreed to pay any
company or person, other than a bona fide employee working solely for the Surveyor, any fee, commission,
percentage, brokerage fee, gifts or any other consideration, contingent upon or resulting from the award or making of
this contract. For breach or violation of this warranty, the City shall have the right to annul this Agreement without
liability, or in its discretion to deduct from the Agreement price or consideration or otherwise recover, the full
amount of such fee, commission, percentage, brokerage fee, gift or contingent fee.
Any and all employees of the Surveyor, while engaged in the performance of any work or services required by the
Surveyor under this Agreement, shall be considered employees of the Surveyor only and not of the City and any and
all claims that may or might arise under the Workman's Compensation Act on behalf of said employees, while so
engaged and any and all claims made by a third party as a consequence of any negligent act or omission on the part
of the Surveyor's employees, while so engaged on any of the work or services provided to be rendered herein, shall
be the sole obligation and responsibility of the Surveyor.
The Surveyor shall not engage, on a full or part-time basis, or other basis, during the period of the contract, any
professional or technical personnel who are, or have been at any time during the period of this contract, in the
employ of the City except regularly retired employees, without written consent of the public employer of such
person.
If during the time period of this agreement, the Surveyor finds it necessary to increase its professional, technical, or
clerical staff as a result of this work, the Surveyor will actively solicit minorities through their advertisement and
interview process.
w:\wwp-27-3082 earlington sewer repl ph i\survey contract.doc\ mab 4 FRM- Q7Cnrvevnr rint/hh
X
NONDISCRIMINATION
The Surveyor agrees not to discriminate against any client, employee or applicant for employment or for services
because of race, creed, color, national origin, marital status, sex, age or handicap except for a bona fide occupational
qualification with regard to, but not limited to the following: employment upgrading; demotion or transfer;
recruitment or any recruitment advertising; layoff or terminations; rates of pay or other forms of compensation;
selection for training; rendition of services. The Surveyor understands and agrees that if it violates this Non -
Discrimination provision, this Agreement may be terminated by the City and further that the Surveyor shall be
barred from performing any services for the City now or in the future, unless a showing is made satisfactory to the
City that discriminatory practices have terminated and that recurrence of such action is unlikely.
X1
TERMINATION OF AGREEMENT
A. The City reserves the right to terminate this Agreement at any time upon not less than ten (10) days
written notice to the Surveyor, subject to the City's obligation to pay Surveyor in accordance with
subparagraphs C and D below.
B. In the event of the death of a member, partner or officer of the Surveyor, or any of its supervisory
personnel assigned to the project, the surviving members of the Surveyor hereby agree to complete the
work under the terms of this Agreement, if requested to do so by the City. This section shall not be a bar
to re -negotiations of this Agreement between surviving members of the Surveyor and the City, if the City
so chooses.
In the event of the death of any of the parties listed in the previous paragraph, should the surviving
members of the Surveyor, with the City's concurrence, desire to terminate this Agreement, payment shall
be made as set forth in Subsection C of this section.
C. In the event this Agreement is terminated by the City other than for fault on the part of the Surveyor, a
final payment shall be made to the Surveyor for actual time and material expenses for the work complete
at the time of termination of the Agreement. In addition, the Surveyor shall be paid on the same basis as
above for any authorized extra work completed. No payment shall be made for any work completed after
ten (10) days following receipt by the Surveyor of the Notice to Terminate, except for work which may
be required to complete checking of finalized work and record surveys as required by Washington State
law. If the accumulated payment made to the Surveyor prior to Notice of Termination exceeds the total
amount that would be due as set forth herein above, then no final payment shall be due and the Surveyor
shall immediately reimburse the City for any excess paid.
D. In the event the services of the Surveyor are terminated by the City for fault on the part of the Surveyor,
the above stated formula for payment shall not apply. In such an event the amount to be paid shall be
determined by the City with consideration given to the actual costs incurred by the Surveyor in
performing the work to the date of termination, the amount of work originally required which was
satisfactorily completed to date of termination, whether that work is in a form or of a type which is
usable to the City at the time of termination, the cost to the City of employing another firm to complete
the work required and the time which may be required to do so, and other factors which affect the value
to the City of the work performed at the time of termination. Under no circumstances shall payment
made under this subsection exceed the amount which would have been made if the formula set forth in
subsection C above had been applied.
E. In the event this Agreement is terminated prior to completion of the work, the original copies of all
Engineering plans, reports and documents prepared by the Surveyor prior to termination shall become the
property of the City for its use without restriction. Such unrestricted use not occurring as a part of this
project, shall be without liability or legal exposure to the Surveyor.
w:\wwp-27-3082 earlington sewer rep] ph i\survey contract.doc\ mab S FRM Q7..0— v,vnr dWhh
F. Payment 'for any part of the work by the City shall not constitute a waiver by the City of any remedies of
any type it may have against the Surveyor for any breach of this Agreement by the Surveyor, or for
failure of the Surveyor to perform work required of it by the City. Forbearance of any rights under the
Agreement will not constitute waiver of entitlement to exercise those rights with respect to any future act
or omission by the Surveyor.
X1I
DISPUTES
Any dispute concerning questions of facts in connection with work not disposed of by agreement between the
Surveyor and the City shall be referred for determination to the Director of Planning/Building/Public Works or
his/her successors and delegees, whose decision in the matter shall be final and conclusive on the parties to this
Agreement.
In the event that either party is required to institute legal action or proceedings to enforce any of its rights in this
Agreement, both parties agree that any such action shall be brought in the Superior Court of the State of
Washington, situated in King County.
X11I
LEGAL RELATIONS
The Surveyor shall comply with all Federal Government, State and local laws and ordinances applicable to the work
to be done under this Agreement. This contract shall be interpreted and construed in accordance with the laws of
Washington.
The Surveyor agrees to indemnify, defend and hold the City and its officers and employees harmless from and shall
process and defend at its own expense all claims, demands or suits at law or equity arising in whole or part from the
Surveyor's negligent acts, errors, or omissions under this Agreement provided that nothing herein shall require the
Surveyor to indemnify the City against and hold harmless the City from claims, demands or suits based upon the
conduct of the City, its officers or employees and provided further that if the claims or suits are caused by or result
from the concurrent negligence of (a) the Surveyor's agents or employees and (b) the City, its agents, officers and
employees, this provision with respect to claims or suits based upon such concurrent negligence shall be valid and
enforceable only to the extent of the Surveyor's negligence or the negligence of the Surveyor's agents or employees
except as limited below.
The Surveyor shall secure general liability, property damage, auto liability, and professional liability coverage in the
amount of $1.0 million, with a General Aggregate in the amount of $2 million, unless waived or reduced by the City.
The Consultant shall submit a completed City of Renton Insurance Information Form, and the Standard Acord. The
City of Renton shall be named as an "additional insured" on all contracts/projects. Surveyor shall furnish copies of
the declarations pages of relevant insurance policies to the City prior to execution of any Scope of Work. The
Certification and Declaration page(s) shall be in a form as approved by the City. If the City's Risk Manager has the
Declaration page(s) on file from a previous contract and no changes in insurance coverage has occurred, only the
Certification Form will be required.
All coverages provided by the Surveyor shall be in a form, and underwritten by a company acceptable to the City.
The City will normally require carriers to have minimum A.M. Best rating of A XII. The Surveyor shall keep all
required coverages in full force and effect during the life of any Scope of Work, and a minimum of thirty days'
notice shall be given to the City prior to the cancellation of any policy.
The Surveyors's relation to the City shall be at all times as an independent contractor.
XIV
SUBLETTING OR ASSIGNING OF CONTRACTS
The Surveyor shall not sublet or assign any of the work covered by this Agreement without the express consent of
the City.
w:\wwp-27-3082 earlington sewer repl ph i\survey contract.doc\ mab 6 FRM- Q7Rnrvev—dm[hh
XV
ENDORSEMENT OF PLANS
The Surveyor shall place their certification on all plans, specifications, estimates or any other engineering data
furnished by them in accordance with RCW 18.43.070.
XVI
COMPLETE AGREEMENT
This document and referenced attachments contain all covenants, stipulations, and provisions agreed upon by the
parties. Later Scope of Work s will be in writing and executed and will become part of this agreement. No agent, or
representative of either party has authority to make, and the parties shall not be bound by or be liable for, any
statement, representation, promise, or agreement not set forth herein. No changes, amendments, or modifications of
the terms hereof shall be valid unless reduced to writing and signed by the parties as an amendment to this
Agreement.
The invalidity or unenforceability of any provision in this Agreement shall not affect the other provisions hereof,
and this Agreement shall be construed in all respects as if such invalid or unenforceable provision were omitted.
XVIIl
EXECUTION AND ACCEPTANCE
This Agreement may be simultaneously executed in several counterparts, each of which shall be deemed to be an
original having identical legal effect. The Surveyor does hereby ratify and adopt all statements, representations,
warranties, covenants, and agreements contained in the Request for Qualifications, and the supporting materials
submitted by the Surveyor, and does hereby accept the Agreement and agrees to all of the terms and conditions
thereof.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the day and year first above
written.
CONSULTANT
Signature
type or print name
Title
CITY OF RENTON
Date Jesse Tanner, Mayor
Bonnie I. Walton, City Clerk
Date
w:\wwp-27-3082 earlington sewer rep] ph i\survey contract.doc\ mab 7 FRM QZCnrvevnr dnt/hh
Engineering
Planning
Surveying
January 31, 2003
Michael A. Benoit
City of Renton
1055 South Grady Way
Renton, WA 98055
Re: Request for Survey Services for the Earlington
Sewer Replacement Project
Dear Michael:
P03-759/205
Penhallegon Associates Consulting Engineers, Inc. (PACE) is pleased to present this estimate to
provide Surveying Services for the Earlington Sewer Replacement project based on your letter to
Don Fordney dated January 22, 2003.
Penhallegon Associates Consulting Engineers, Inc., hereinafter referred to as the "Surveyor",
agrees to provide professional services in connection with the Project described herein to the City
of Renton hereinafter referred to as the "Client".
Article L Scope of Services — Topographic Survey
Purpose: The preparation of a base map for future design.
Area of Coverage: Approximately 15,200 linear feet in length in the Earlington Area of
Renton. Approximately 12,000 feet within street right-of-ways and approximately 3,200 feet
along existing sewer lines outside of street right-of-ways.
Description:
■ All surveying will be tied to City of Renton NAD 83/91 horizontal control points and
NAVD 88 vertical control points. All survey work shall be conducted in accordance with
the City of Renton requirements.
■ An electronic design locate will be ordered.
■ Establish right-of-way, centerlines and boundaries.
■ Set additional Bench Marks at beginning and end of streets, if needed. Maximum distance
between bench marks to be 1000 feet in distance or 100 feet in elevation.
• Show spot elevations on hard surfaces on a separate layer.
Federal Way Seattle Kirkland
253.568.6500 1601 Second Avenue. Suite 1000 • Seattle WA 98101-3511 425.827.2014
P. 206.441.1855 • F.206.448.7167
Portland 888.723.7853
Michael A. Benoit
City of Renton
Earlington Sewer Replacement
P03-759
January 31, 2003
Page 2
■ Show all data and 10 feet beyond right-of-way lines.
■ Show contour lines at 2-foot intervals.
• Show all known utilities, note size, type, invert elevations and direction of flow.
■ Show all prominent landmarks.
■ Show front edge of houses, house numbers, property lines and right-of-way lines.
■ Show ground elevations to nearest tenth of a foot at two main house corners with note to
the existence of a basement and approximate measure up to main floor.
■ One print for each street for review purposes. City will prepare plan and profile sheets.
■ Project shall be prepared in AutoCAD version 2000 at a scale of 1"=20'.
■ Two sets of prints will be provided for review, corrections will be made and two sets
provided for final review.
■ Final Product: Disk or CD
Task A. Supervision, research and centerline control survey
Objective: Establish centerline of the streets, set benchmarks and provide project
coordination.
Approach: Recover monuments or set PK nail and aluminum washer or equal at street
intersections. Recover plat and subdivision monuments together with other
available survey control points to establish street intersections for plotting right-of-
ways. Run vertical control and elevate control points for topographic survey
work. Run a level loop through the horizontal control, and set at least one
benchmark at each street intersection and/or as called for in description of the
work.
Task B. Calculations
Objective: Establish coordinates and elevations for control points and fix street intersections
and right-of-way lines.
Approach: Compute traverse closures and coordinates on recovered points.
Task C Field Topographic Survey
Objective: Acquire topographic features for final map compilation.
Approach: Radial topography. Data collect surface utilities and all other topography within
streets and along existing sewers outside right-of-way as shown on attached map.
Prepare sketches and acquire measure downs to inverts of existing utility
structures.
Task D. Mapping
Objective: Preparation of Final Mapping.
Approach: AutoCAD drafting in Release 2000. Check all data for correctness, plot located
and calculated data on base map.
Michael A. Benoit
City of Renton
Earlington Sewer Replacement
Product: Disk only.
Project Assumptions
P03-759
January 31, 2003
Page 3
The following conditions clarify the assumptions and limitations of our scope of services:
• Cutting of brush and small trees will be permitted if necessary to perform the field survey.
• For the purpose of this estimate we have assumed the mapping will be limited to the exterior
of the buildings.
Project Exclusions
The following conditions clarify the exclusions from our scope of services:
• Entering manholes or other structures to obtain invert elevations or other dimensions.
• Locating features in or mapping the insides of the buildings.
• Excavating or potholing to locate buried utilities.
Article II. Basic Services Fee
Basic Services compensation for Tasks A, B & C will be on an hourly basis not to exceed
$69,861.00 plus reimbursable expenses of $6,319.20 for a total of $76,180.20.
The hourly rate charges shall be billed using the hourly rates in effect at the time the services are
provided.
The breakdown for the above fees is shown on attachment A.
Article III. Schedule
To be negotiated.
Significant changes in the schedule following negotiations may be cause for request for additional
compensation.
Article IV. Terms
A. This letter shall serve as a contract unless it is included in another written agreement.
B. The Owner shall make payment for services monthly. The payments shall be in proportion
to the progress of the Surveyor's work.
C. The Owner shall make no deduction from the Surveyor's compensation on account of
penalties, liquidated damages or other sums withheld from the Contractor(s) through no
fault of the Surveyor.
Michael A. Benoit P03-759
City of Renton January 31, 2003
Earlington Sewer Replacement Page 4
B. The Surveyor shall submit requests for payment monthly on forms provided and in a
manner prescribed by the Owner.
Article V. Compensation for Additional Services and Reimbursable
All additional services shall be authorized in writing prior to performance of the work.
A. Surveyor shall submit monthly requests for payment authorized additional services and
reimbursable expenses.
B. When requesting payment for additional services or reimbursable expenses, the Surveyor
shall submit an itemized billing showing unit cost and quantity of each item billed, and
referencing the specific authorizing document.
C. Additional Services shall be billed on an hourly basis using the hourly rates in effect at the
time the services are provided.
Article VI. Approval
If the above meets with your approval, please sign below and return one copy of this letter to our
office for our files. This scope and fee proposal reflects our understanding of the work at this
time. If you feel we do not accurately understand the project, please do not hesitate to let us
know. We appreciate the opportunity to submit this proposal, and look forward to discussing the
work in more detail with you. Please contact us if you need additional information.
Sincerely,
PENHALLEGON ASSOCIATES
CONSULTING ENGINEERS, INC.
Don F rdn
Principal Surveyor
Accepted for the City of Renton by:
Authorized Signature Title Date
PACE I I Attachment �A Project Budget Worksheet
Project Name l Earlington Sewer Replacement Project Prepared By:FE-MF
1
Project #: L P03.759 Billing Group Location: I Earlington Area - Renton, WA Date:31-Jan-03
Drawing/
Labor Hours by Classification
Project Project Survey Project
DrawingiTask Title Task
Manager Engineer Engineer CADD Tech Manager Surveyor Survey Crew: QA/QC Admin Admin Admin
Total
A. Research & Control
2 24 40 0.5
66.5
0.0
B. Calculations
4 60 0.5
64.5
0.0
C. Field Togographic Survey
40 264 1
305.00.0
D. Mapping
260 4 .40 05
304.5
Total Hours
Hourly Rate
Labor Total
0.0
0.0
0.0
0.0
0.0
0.0:
0.0:
0.0:
260.0:
10.0:
164.0:
304,0:
0.0:
2.5:
0.0:
0.0
740,5
$0.00
$0.00
$0.00
$73.00
$104.00
$88.00
$116.00
$0.00
$58.00
$0.00
$0.00
.....
$0
$0
$0
$18,980
$1,040
$14,432
$35,264
$0
$145
$0
$0
Expenses
rate/unit
Reimbursable
Quantity Cost
Rep rog rap h ics/Copying
Plotter
PhotoNideo
Mileage j $0.35
912: $319.20
Utility Locate Service (APS) $75.00
80: $6,000.00
PerDiem
Total
Labor
S $69,861.00
........................
......... ...
Subconsultan ts
............
Architect ...........
Mechanical Engineer ......
Electrical Engineer PACE Billed Labor Total
$67861.00
File: 03759.xls, Fee Worksheet Page 1 of 1 Printed: 2/3/03, 3:22 PM
CITY OF RENTON COUNCIL AGENDA BILL
Submitting Data: Planning/Building/Public Works
Dept/Div/Board.. Wastewater Utility
Staff Contact...... Mike Benoit (x-7206)
Subject:
Earlington Sanitary Sewer Replacement Survey
Consultant Contract with Penhallegon Associates
Exhibits:
Consultant Contract -4
Recommended Action
Council Concur
Fiscal Impact:
Expenditure Required...
Amount Budgeted.......
Total Project Budget
ern c�a ��ecl ,
$76,180.20
$90,000
$1,100,000 (Ph I - 2003)
(approved 2003 appropriation;
Al a:
For Agenda of:
February 24, 2003
Agenda Status
Consent ..............
Public Hearing..
Correspondence..
Ordinance .............
Resolution.......... .
Old Business........
New Business.......
Study Sessions.....
Information......... "
Approvals:
Legal Dept ......... X
Finance Dept ...... X
Other ...............
R.
65
.. _ LTIALJU'�
Transfer/Amendment....... $0
Revenue Generated......... $0
City Share Total Project..
SUMMARY OF ACTION:
The Earlington area is one of the areas identified for Sanitary Sewer Main Replacement and
Rehabilitation in the 2003 Capital Improvement Program (CIP). The 2003 CIP estimates a
project expense of $4,400,000, anticipates that the project will begin in 2003, and will be
phased annually with a completion date of 2006.
As a first step in the project, we are proposing to have Penhallegon Associates survey the
project area. The cost of the proposed contract is $76,180.20. Approved budget authority for
Sanitary Sewer Main Replacement and Rehabilitation for the year 2003 is $1,200,000, of which
$1,100,000 is earmarked for Earlington.
STAFF RECOMMENDATION:
Staff recommends that Council authorize the Mayor and City Clerk to execute the attached
contract with Penhallegon Associates for survey work associated with the Earlington Sanitary
Sewer Replacement project.
\\DAEDALUS\SYS2\SHARED\Fi1e Sys\WWP - WasteWater\WWP-27-3082 Earlington Sewer Repl PH I\AGENDA BILL PACE.doc\MAB:If
AGENDA BILL SCHEDULE
AGENDA BILL TITLE — Q C-�r►vc
PREPARED BY: Extension: ,K 7o2-V C0
llll-- WE
GREGG'S SIGNATURE
2 ( - 03
TRANSMIT TO CLERK (Done by
2 f g D 3
JAY'S AGENDA BILL MEETING: 10 am - 7th floor
COUNCIL MEETING DATE Rere �,
�6ium t o & h-CLk�
/
COMMITTEE MEETING DATE (Take Committee Report)
/
CO E
Time: lace:
COUNCIL MEETING REPO D OUT
AB-SCI Ulf
CITY OF RENTON COUNCIL AGENDA BILL
Al #:
Submitting Data: toj P VJ _
Dept/Div/Board.. (,� P.+.t�G LAtt
Staff Contact...... Mike Benoit (x-7206)
Subject:
Earlington Sanitary Sewer Replacement Survey
Consultant Contract
Exhibits:
Consultant Contract
Recommended Action:
Council Concur
Fiscal Impact:
Expenditure Required...
Amount Budgeted.......
Total Project Budget
$76,180.20
$90,000
$1,100,000 (Ph I - 2003)
(approved 2003 appropriation.
SUMMARY OF ACTION:
7 i5 One of the areas identified for
apI gram (CIP) J&tl
expense of $4,400,000; anticipates that t]
annually with a completion date of 2006.
For Agenda of:
February 24, 2003
Agenda Status
Consent ..............
Public Hearing..
Correspondence..
Ordinance .............
Resolution........... .
Old Business........
New Business.......
Study Sessions......
Information......... /
Approvals:
Legal ..... /
Finance Dept/..... i,
Other...... /........
Transf /Amendment....... $0
Rev nue Generated......... $0
C' y Share Total Project..
in Replacement and Rehabilitation in the 2003
ington area. The 2003 CIP estimates a project
ect will begin in 2003; and will be phased
As a first step in the project we are p posing to have Penhalle 61 Associates survey the project
area. The cost of the proposed con act is $76,180.20. Appro4ed budget authority for Sanitary
Sewer Main Replacement and Re abilitation for the year 2003 is $1,200,000 of which
$1,100,000 is earmarked for E lington.
STAFF RECOMMENDATI
Staff recommends that C uncil authorize the Mayor and City Clerk to execute the attached
contract with Penhalle n Associates for survey work associated with the Earlington Sanitary
Sewer Replacement oject.
W:\WWP-27-3082 Earlington Sewer Repl PH I\AGENDA BILL PACE.doc
CITY OF RENTON COUNCIL AGENDA BILL COPY'
Al a:
Submitting Data: Planning/Building/Public Works
For Agenda of:
Dept/Div/Board.. Wastewater Utility
February 24, 2003
Agenda Status
Staff Contact...... Mike Benoit (x-7206)
Consent .............. X
Public Hearing..
Subject:
Earlington Sanitary Sewer Replacement Survey
Correspondence..
Consultant Contract with Penhallegon Associates
Ordinance .............
Resolution........... .
Old Business........
New Business.......
Exhibits:
Consultant Contract
Study Sessions......
Information........ .
Recommended Action:
Council Concur
Fiscal Impact:
Expenditure Required...
Amount Budgeted.......
Total Project Budget
$76,180.20
$90,000
$1,100,000 (Ph I - 2003)
(approved 2003 appropriation;
SUMMARY OF ACTION:
Approvals:
Legal Dept......... X
Finance Dept ...... X
Other ...............
Transfer/Amendment....... $0
Revenue Generated......... $0
City Share Total Project..
The Earlington area is one of the areas identified for Sanitary Sewer Main Replacement and
Rehabilitation in the 2003 Capital Improvement Program (CIP). The 2003 CIP estimates a
project expense of $4,400,000, anticipates that the project will begin in 2003, and will be
phased annually with a completion date of 2006.
As a first step in the project, we are proposing to have Penhallegon Associates survey the
project area. The cost of the proposed contract is $76,180.20. Approved budget authority for
Sanitary Sewer Main Replacement and Rehabilitation for the year 2003 is $1,200,000, of which
$1,100,000 is earmarked for Earlington.
STAFF RECOMMENDATION:
Staff recommends that Council authorize the Mayor and City Clerk to execute the attached
contract with Penhallegon Associates for survey work associated with the Earlington Sanitary
Sewer Replacement project.
\\DAEDALUS\SYS2\SHARED\File Sys\WWP - WasteWater\WWP-27-3082 Earlington Sewer Rep] PH BAGENDA BILL PACE.doc\MAB:If
_ V
SURVEYING
SERVICES AGREEMENT
THIS AGREEMENT, made and entered into on this , day of , 20 , by and between the
CITY OF RENTON, WASHINGTON, A MUNICIPAL CORPORATION HEREINAFTER CALLED THE "CITY,"
and the consulting firm Penhallegon Associates Consulting Engineers, Inc. whose address is,
750 Sixth Street South, Kirkland, WA 98033 at which work will be available for inspection, hereinafter called the
"SURVEYOR."
PROJECT NAME: Earlington Sanitary Sewer Replacement / Rehabilitation
WHEREAS, the City has not sufficient qualified engineering employees to provide surveying services within a
reasonable time and the City deems it advisable and is desirous of engaging the professional services and assistance
of a qualified professional surveying firm to do the necessary field surveying work for Public Works projects and the
maintenance of the City's horizontal and vertical control, and
WHEREAS, the Surveyor has represented and by entering into this Agreement now represents, that it is in full
compliance with the statutes of the State of Washington for registration of professional land surveyor, has a current
valid corporate certificate from the State of Washington or has a valid assumed name filing with the Secretary of
State and that all personnel to be assigned to the work required under this Agreement are fully qualified to perform
the work to which they will be assigned in a competent and professional manner, and that sufficient qualified
personnel are on staff or readily available to staff this Agreement.
WHEREAS, the Surveyor has indicated that it desires to do the work set forth in the Agreement upon the terms and
conditions set forth below.
NOW THEREFORE, in consideration of the terms, conditions, covenants and performances contained herein below,
the parties hereto agree as follows:
OBJECTIVES AND SCOPE OF WORK
The objective of this Agreement is to provide land surveying services for the various departments which require
such services during the planning, design and/or construction of City of Renton projects and for the development
and maintenance of the City's maps.. The scope of work shall include all services necessary to accomplish the work
and shall detail the documents to be provided as agreed to under Scopes of Work authorized during the duration of
this Agreement.
The Surveyor shall furnish, and hereby warrants that it has, the necessary equipment, materials, and professionally
trained and experienced personnel to facilitate completion of the work described in Exhibit A, Scope of Work,
which is attached hereto and incorporated into this Agreement as though fully set forth herein.
The work shall be verified for accuracy and completeness by the Consultant. The Surveyor will be held responsible
for the accuracy and completeness of the work, even though the work has been accepted
The Surveyor shall perform all work described in this Agreement and accompanying scopes of work to conform with
the policies and standards set forth in Section U.
w:\wwp-27-3082 earlington sewer repl ph i\survey contract.doc\ mab I FRM' 97..0--pv— rint/hh
H
DESIGN CRITERIA
The City will designate the basic premises and criteria for the work needed. Reports and plans, to the extent
feasible, shall be developed in accordance with the latest edition and amendments of local and State regulations,
guidelines, and specifications, including, but not limited to the following:
1. Draft GeoSpatial Positioning Accuracy Standards for the National Spatial Data Infrastructure by the
Federal Geographic Data Subcommittee, December 1996.
2. All pertinent Washington State legislation, e.g. Chapter 58 of the Revised Code of Washington (RCW).
3. All pertinent sections of the Washington State Administrative Code (WAC), e.g. Chapters 332 WAC.
4. City of Renton Survey Specifications as set forth in Section 1-11 of the City of Renton Supplemental
Specifications for the 1997 Standard Specifications for Road, Bridge, and Municipal Construction,
adopted May 19, 1997.
111
ITEMS TO BE FURNISHED TO THE CONSULTANT
BY THE CITY
The City will furnish the Surveyor copies of documents which are available to the City that will facilitate the
preparation of the plans, studies, specifications, and estimates within the limits of the assigned work.
All other records needed for the study must be obtained by the Surveyor. The Surveyor will coordinate with other
available sources to obtain data or records available to those agencies. The Surveyor shall be responsible for this
and any other data collection. The Surveyor shall be responsible for the verification of existing records to insure
they represent the accurate and current field conditions. Should field studies be needed, the Surveyor will perform
such work. The City will not be obligated to perform any such field studies.
IV
OWNERSHIP OF PRODUCTS AND
DOCUMENTS TO BE FURNISHED BY THE CONSULTANT
Documents, exhibits or other presentations for the work covered by this Agreement shall be furnished by the
Surveyor to the City upon completion of the various phases of the work. All such material, including working
documents, notes, maps, drawings, photographs, photographic negatives, etc. used in the Scope of Work, shall
become and remain the property of the City and may be used by it without restriction; except that, any use of such
documents by the City not directly related to the Scope of Work pursuant to which the documents were prepared by
the Surveyor shall be without any liability whatsoever to the Surveyor.
Where possible and feasible all written documents and products shall be printed on recycled paper. Final
documents, and interim drafts as feasible, will be printed on both sides of the recycled paper.
V
TIME OF BEGINNING AND COMPLETION
This basic agreement shall be in effect for twelve (12) months from the date of formal acceptance by the City. This
agreement may be extended for a maximum of three (3) years, upon agreement by both parties and written
authorization by the City. The Surveyor shall not begin work under the terms of this Agreement until authorized in
writing by the City by an executed Scope of Work. The time for completion of work performed under this
Agreement shall be specified in the Authorized Scope of Work and as authorized in writing. If this contract would
expire prior to the completion date of any Scope of Work, then this contract shall be automatically extended to the
termination date of the Scope of Work.
w:\wwp-27-3082 earlington sewer repl ph Rsurvey contract.doc\ mab 2 FRM- 97.Ciirvrvnr dnt/hh
Established completion time shall not be extended because of any delays attributable to the Surveyor, but may be
extended by the City in the event of a delay attributable to the City or because of a delay caused by an act of God or
governmental actions or other conditions beyond the control of the Surveyor. A supplemental agreement issued by
the City is required to extend the established time.
Delays attributable to or caused by one of the parties hereto amounting to 30 days or more affecting the completion
of the work may be considered a cause for re negotiation or termination of this Agreement by the other party.
VI
PAYMENT
The Surveyor shall be paid by the City for completed work for services rendered under this Agreement as provided
hereinafter. Such payment shall be full compensation for work performed or services rendered and for all labor,
materials, supplies, equipment, and incidentals necessary to complete the work. All billings for compensation for
work performed under this Agreement will list actual time (days and/or hours) and dates during which the work was
performed and the compensation shall be figured using the rates in Exhibit A.
Time & Materials Billing;
Payment for work accomplished shall be on the basis of the Surveyor's hourly billing rate per crew or man hours as
appropriate plus material expenses. It is assumed that the billing rate for personnel provided covers the overhead
and profit margins for the firm. No payment will be made for overhead or profit beyond the rates established in
Exhibit A.
1. The billing rates should cover the salary expense for professional and technical personnel and principals
for the time they are productively engaged in the work necessary to fulfill the terms of this Agreement.
The billing rates are set forth in the attached Exhibit "A" and by this reference made a part of this
Agreement. The billing rates may be updated annually by written approval of the
Planning/Building/Public Works Administrator.
2. The material costs are those costs directly incurred in fulfilling the terms of this Agreement, including,
but not limited to travel, reproduction, telephone, supplies, and fees of outside consultants. The material
costs will be established for each Scope of Work which when executed will become a part of this
Agreement. Billings for any material costs shall be supported by copies of original bills or invoices.
Reimbursement for outside consultants and services shall be no greater than 1.10 times the invoiced
amount.
3. The maximum amount payable for completion of all work under this Agreement on a time and materials
basis is determined by the total of Authorized Scope of Work as shown in Exhibit "A."
4. Progress payments may be claimed monthly for time and materials actually incurred to date as supported
by detailed statements. Final payment of any balance due the Surveyor of the gross amount earned per
Scope of Work will be made promptly upon its verification by the City after completion and acceptance
by the City of the work for each Scope of Work under this Agreement. Acceptance, by the Surveyor of
final payment on the Scope of Work shall constitute full and final satisfaction of all amounts due or
claimed to be due, for the specific Scope of Work.
Payment for extra work performed under this Agreement shall be paid as agreed to by the parties hereto in writing at
the time extra work is authorized. (Section VIII "EXTRA WORK").
A short narrative progress report shall accompany each voucher for progress payment. The report shall include
discussion of any problems and potential causes for delay.
To provide a means of verifying the invoiced time for consultant employees and material expenses, the City may
conduct employee interviews. Time for the interviews can be billed at normal billing rates.
w:\wwp-27-3082 earlington sewer repl ph i\survey contract.doc\ mab 3 FRM 07Curvevn, d t/hh
Acceptance of such final payment by the Surveyor shall constitute a release of all claims of any nature, related to the
specific Scope of Work, which the Surveyor may have against the City unless such claims are specifically reserved
in writing and transmitted to the City by the Surveyor prior to its acceptance. Said final payment shall not, however,
be a bar to any claims that the City may have against the Surveyor or to any remedies the City may pursue with
respect to such claims.
The Surveyor and its subconsultants shall keep available for inspection, by the City, for a period of three years after
final payment, the cost records and accounts pertaining to this Agreement and all items related to, or bearing upon,
these records. If any litigation, claim or audit is started before the expiration of the three-year retention period, the
records shall be retained until all litigation, claims or audit findings involving the records have been resolved. The
three-year retention period starts when the Surveyor receives final payment.
VII
CHANGES IN WORK
The Surveyor shall make all such revisions and changes in the completed work for each Scope of Work as are
necessary to correct mistakes and blunders appearing therein, when required to do so by the City, without additional
compensation.
Should the City find it desirable for its own purposes to have previously satisfactorily completed work or parts
thereof revised, the Surveyor shall make such revisions, if requested and as directed by the City in writing. This
work shall be considered as Extra Work and will be paid for as provided in Section VIII.
VIII
EXTRA WORK
The City may desire to have the Surveyor perform work or render services in connection with a Scope of Work
Assignment in addition to or other than work provided for by the expressed intent of the Scope of Work. Such work
will be considered as Extra Work and will be specified in a written supplement to the Scope of Work which will set
forth the nature and scope thereof. Work under a supplemental Scope of Work shall not proceed until authorized in
writing by the City. Any dispute as to whether work is Extra Work or work already covered under a Scope of Work
shall be resolved before the work is undertaken.
IX
EMPLOYMENT
The Surveyor warrants that it has not employed or retained any company or person, other than a bona fide employee
working solely for the Surveyor, to solicit or secure this contract and that he has not paid or agreed to pay any
company or person, other than a bona fide employee working solely for the Surveyor, any fee, commission,
percentage, brokerage fee, gifts or any other consideration, contingent upon or resulting from the award or making of
this contract. For breach or violation of this warranty, the City shall have the right to annul this Agreement without
liability, or in its discretion to deduct from the Agreement price or consideration or otherwise recover, the full
amount of such fee, commission, percentage, brokerage fee, gift or contingent fee.
Any and all employees of the Surveyor, while engaged in the performance of any work or services required by the
Surveyor under this Agreement, shall be considered employees of the Surveyor only and not of the City and any and
all claims that may or might arise under the Workman's Compensation Act on behalf of said employees, while so
engaged and any and all claims made by a third party as a consequence of any negligent act or omission on the part
of the Surveyor's employees, while so engaged on any of the work or services provided to be rendered herein, shall
be the sole obligation and responsibility of the Surveyor.
The Surveyor shall not engage, on a full or part-time basis, or other basis, during the period of the contract, any
professional or technical personnel who are, or have been at any time during the period of this contract, in the
employ of the City except regularly retired employees, without written consent of the public employer of such
person.
If during the time period of this agreement, the Surveyor finds it necessary to increase its professional, technical, or
clerical staff as a result of this work, the Surveyor will actively solicit minorities through their advertisement and
interview process.
w:\wwp-27-3082 earlington sewer repl ph Asurvey contract.doc\ mab 4 FRM- 97.Curvevnr dnt/hh
X
NONDISCRIMINATION
The Surveyor agrees not to discriminate against any client, employee or applicant for employment or for services
because of race, creed, color, national origin, marital status, sex, age or handicap except for a bona fide occupational
qualification with regard to, but not limited to the following: employment upgrading; demotion or transfer;
recruitment or any recruitment advertising; layoff or terminations; rates of pay or other forms of compensation;
selection for training; rendition of services. The Surveyor understands and agrees that if it violates this Non -
Discrimination provision, this Agreement may be terminated by the City and further that the Surveyor shall be
barred from performing any services for the City now or in the future, unless a showing is made satisfactory to the
City that discriminatory practices have terminated and that recurrence of such action is unlikely.
XI
TERMINATION OF AGREEMENT
A. The City reserves the right to terminate this Agreement at any time upon not less than ten (10) days
written notice to the Surveyor, subject to the City's obligation to pay Surveyor in accordance with
subparagraphs C and D below.
B. In the event of the death of a member, partner or officer of the Surveyor, or any of its supervisory
personnel assigned to the project, the surviving members of the Surveyor hereby agree to complete the
work under the terms of this Agreement, if requested to do so by the City. This section shall not be a bar
to re -negotiations of this Agreement between surviving members of the Surveyor and the City, if the City
so chooses.
In the event of the death of any of the parties listed in the previous paragraph, should the surviving
members of the Surveyor, with the City's concurrence, desire to terminate this Agreement, payment shall
be made as set forth in Subsection C of this section.
C. In the event this Agreement is terminated by the City other than for fault on the part of the Surveyor, a
final payment shall be made to the Surveyor for actual time and material expenses for the work complete
at the time of termination of the Agreement. In addition, the Surveyor shall be paid on the same basis as
above for any authorized extra work completed. No payment shall be made for any work completed after
ten (10) days following receipt by the Surveyor of the Notice to Terminate, except for work which may
be required to complete checking of finalized work and record surveys as required by Washington State
law. If the accumulated payment made to the Surveyor prior to Notice of Termination exceeds the total
amount that would be due as set forth herein above, then no final payment shall be due and the Surveyor
shall immediately reimburse the City for any excess paid.
D. In the event the services of the Surveyor are terminated by the City for fault on the part of the Surveyor,
the above stated formula for payment shall not apply. In such an event the amount to be paid shall be
determined by the City with consideration given to the actual costs incurred by the Surveyor in
performing the work to the date of termination, the amount of work originally required which was
satisfactorily completed to date of termination, whether that work is in a form or of a type which is
usable to the City at the time of termination, the cost to the City of employing another firm to complete
the work required and the time which may be required to do so, and other factors which affect the value
to the City of the work performed at the time of termination. Under no circumstances shall payment
made under this subsection exceed the amount which would have been made if the formula set forth in
subsection C above had been applied.
E. In the event this Agreement is terminated prior to completion of the work, the original copies of all
Engineering plans, reports and documents prepared by the Surveyor prior to termination shall become the
property of the City for its use without restriction. Such unrestricted use not occurring as a part of this
project, shall be without liability or legal exposure to the Surveyor.
w:\wwp-27-3082 earlington sewer repl ph i\survey contract.doc\ mab 5 PRM- 07..0—"p nr rint/hh
F. Payment for any part of the work by the City shall not constitute a waiver by the City of any remedies of
any type it may have against the Surveyor for any breach of this Agreement by the Surveyor, or for
failure of the Surveyor to perform work required of it by the City. Forbearance of any rights under the
Agreement will not constitute waiver of entitlement to exercise those rights with respect to any future act
or omission by the Surveyor.
XII
DISPUTES
Any dispute concerning questions of facts in connection with work not disposed of by agreement between the
Surveyor and the City shall be referred for determination to the Director of Planning/Building/Public Works or
his/her successors and delegees, whose decision in the matter shall be final and conclusive on the parties to this
Agreement.
In the event that either party is required to institute legal action or proceedings to enforce any of its rights in this
Agreement, both parties agree that any such action shall be brought in the Superior Court of the State of
Washington, situated in King County.
XIII
LEGAL RELATIONS
The Surveyor shall comply with all Federal Government, State and local laws and ordinances applicable to the work
to be done under this Agreement. This contract shall be interpreted and construed in accordance with the laws of
Washington.
The Surveyor agrees to indemnify, defend and hold the City and its officers and employees harmless from and shall
process and defend at its own expense all claims, demands or suits at law or equity arising in whole or part from the
Surveyor's negligent acts, errors, or omissions under this Agreement provided that nothing herein shall require the
Surveyor to indemnify the City against and hold harmless the City from claims, demands or suits based upon the
conduct of the City, its officers or employees and provided further that if the claims or suits are caused by or result
from the concurrent negligence of (a) the Surveyor's agents or employees and (b) the City, its agents, officers and
employees, this provision with respect to claims or suits based upon such concurrent negligence shall be valid and
enforceable only to the extent of the Surveyor's negligence or the negligence of the Surveyor's agents or employees
except as limited below.
The Surveyor shall secure general liability, property damage, auto liability, and professional liability coverage in the
amount of $1.0 million, with a General Aggregate in the amount of $2 million, unless waived or reduced by the City.
The Consultant shall submit a completed City of Renton Insurance Information Form, and the Standard Acord. The
City of Renton shall be named as an "additional insured" on all contracts/projects. Surveyor shall furnish copies of
the declarations pages of relevant insurance policies to the City prior to execution of any Scope of Work. The
Certification and Declaration page(s) shall be in a form as approved by the City. If the City's Risk Manager has the
Declaration page(s) on file from a previous contract and no changes in insurance coverage has occurred, only the
Certification Form will be required.
All coverages provided by the Surveyor shall be in a form, and underwritten by a company acceptable to the City.
The City will normally require carriers to have minimum A.M. Best rating of A XII. The Surveyor shall keep all
required coverages in full force and effect during the life of any Scope of Work, and a minimum of thirty days'
notice shall be given to the City prior to the cancellation of any policy.
The Surveyors's relation to the City shall be at all times as an independent contractor.
XIV
SUBLETTING OR ASSIGNING OF CONTRACTS
The Surveyor shall not sublet or assign any of the work covered by this Agreement without the express consent of
the City.
w:\wwp-27-3082 earlington sewer repl ph i\survey contract.doc\ mab O FRM- 97Cnmpe,n—tnt/hh
XV
ENDORSEMENT OF PLANS
The Surveyor shall place their certification on all plans, specifications, estimates or any other engineering data
furnished by them in accordance with RCW 18.43.070.
XVI
COMPLETE AGREEMENT
This document and referenced attachments contain all covenants, stipulations, and provisions agreed upon by the
parties. Later Scope of Work s will be in writing and executed and will become part of this agreement. No agent, or
representative of either party has authority to make, and the parties shall not be bound by or be liable for, any
statement, representation, promise, or agreement not set forth herein. No changes, amendments, or modifications of
the terms hereof shall be valid unless reduced to writing and signed by the parties as an amendment to this
Agreement.
The invalidity or unenforceability of any provision in this Agreement shall not affect the other provisions hereof,
and this Agreement shall be construed in all respects as if such invalid or unenforceable provision were omitted.
XVIII
EXECUTION AND ACCEPTANCE
This Agreement may be simultaneously executed in several counterparts, each of which shall be deemed to be an
original having identical legal effect. The Surveyor does hereby ratify and adopt all statements, representations,
warranties, covenants, and agreements contained in the Request for Qualifications, and the supporting materials
submitted by the Surveyor, and does hereby accept the Agreement and agrees to all of the terms and conditions
thereof.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the day and year first above
written.
CONSULTANT
Signature
type or print name
Title
Date
CITY OF RENTON
Jesse Tanner, Mayor
001:L11M
Bonnie I. Walton, City Clerk
Date
w:\wwp-27-3082 earlington sewer repl ph i\survey contract.doc\ mab 7 FRM Q7G,mevnr int/hh
Penhallegon Associates Consulting Engineers, Inc.
Engineering
Planning
Surveying
January 31, 2003
Michael A. Benoit
City of Renton
1055 South Grady Way
Renton, WA 98055
Re: Request for Survey Services for the Earlington
Sewer Replacement Project
Dear Michael:
P03-759/205
Penhallegon Associates Consulting Engineers, Inc. (PACE) is pleased to present this estimate to
provide Surveying Services for the Earlington Sewer Replacement project based on your letter to
Don Fordney dated January 22, 2003.
Penhallegon Associates Consulting Engineers, Inc., hereinafter referred to as the "Surveyor",
agrees to provide professional services in connection with the Project described herein to the City
of Renton hereinafter referred to as the "Client".
Article L Scope of Services — Topographic Survey
Purpose: The preparation of a base map for future design.
Area of Coverage: Approximately 15,200 linear feet in length in the Earlington Area of
Renton. Approximately 12,000 feet within street right-of-ways and approximately 3,200 feet
along existing sewer lines outside of street right-of-ways.
Description:
■ All surveying will be tied to City of Renton NAD 83/91 horizontal control points and
NAVD 88 vertical control points. All survey work shall be conducted in accordance with
the City of Renton requirements.
■ An electronic design locate will be ordered.
■ Establish right-of-way, centerlines and boundaries.
■ Set additional Bench Marks at beginning and end of streets, if needed. Maximum distance
between bench marks to be 1000 feet in distance or 100 feet in elevation.
■ Show spot elevations on hard surfaces on a separate layer.
Federal Way Seattle Kirkland
253.568.6500 1601 Second Avenue. Suite 1000 • Seattle WA 98101-3511 425.827.2014
P. 206.441.1855 • F 206.448.7167
Portland 888.723.7853
f
Michael A. Benoit P03-759
City of Renton
Earlington Sewer Replacement
January 31, 2003
Page 2
■ Show all data and 10 feet beyond right-of-way lines.
■ Show contour lines at 2-foot intervals.
■ Show all known utilities, note size, type, invert elevations and direction of flow.
■ Show all prominent landmarks.
■ Show front edge of houses, house numbers, property fines and right-of-way lines.
■ Show ground elevations to nearest tenth of a foot at two main house corners with note to
the existence of a basement and approximate measure up to main floor.
■ One print for each street for review purposes. City will prepare plan and profile sheets.
• Project shall be prepared in AutoCAD version 2000 at a scale of 1"=20'.
■ Two sets of prints will be provided for review, corrections will be made and two sets
provided for final review.
■ Final Product: Disk or CD
Task A. Supervision, research and centerline control survey
Objective: Establish centerline of the streets, set benchmarks and provide project
coordination.
Approach: Recover monuments or set PK nail and aluminum washer or equal at street
intersections. Recover plat and subdivision monuments together with other
available survey control points to establish street intersections for plotting right-of-
ways. Run vertical control and elevate control points for topographic survey
work. Run a level loop through the horizontal control, and set at least one
benchmark at each street intersection and/or as called for in description of the
work.
Task B. Calculations
Objective: Establish coordinates and elevations for control points and fix street intersections
and right-of-way lines.
Approach: Compute traverse closures and coordinates on recovered points.
Task C Field Topographic Survey
Objective: Acquire topographic features for final map compilation.
Approach: Radial topography. Data collect surface utilities and all other topography within
streets and along existing sewers outside right-of-way as shown on attached map.
Prepare sketches and acquire measure downs to inverts of existing utility
structures.
Task D. Mapping
Objective: Preparation of Final Mapping.
Approach: AutoCAD drafting in Release 2000. Check all data for correctness, plot located
and calculated data on base map.
f Michael A. Benoit
City of Renton
Earlington Sewer Replacement
Product: Disk only.
Project Assumptions
P03-759
January 31, 2003
Page 3
The following conditions clarify the assumptions and limitations of our scope of services:
• Cutting of brush and small trees will be permitted if necessary to perform the field survey.
• For the purpose of this estimate we have assumed the mapping will be limited to the exterior
of the buildings.
Project Exclusions
The following conditions clarify the exclusions from our scope of services:
• Entering manholes or other structures to obtain invert elevations or other dimensions.
• Locating features in or mapping the insides of the buildings.
• Excavating or potholing to locate buried utilities.
Article II. Basic Services Fee
Basic Services compensation for Tasks A, B & C will be on an hourly basis not to exceed
$69,861.00 plus reimbursable expenses of $6,319.20 for a total of $76,180.20.
The hourly rate charges shall be billed using the hourly rates in effect at the time the services are
provided.
The breakdown for the above fees is shown on attachment A.
Article III. Schedule
To be negotiated.
Significant changes in the schedule following negotiations may be cause for request for additional
compensation.
Article IV. Terms
A. This letter shall serve as a contract unless it is included in another written agreement.
B. The Owner shall make payment for services monthly. The payments shall be in proportion
to the progress of the Surveyor's work.
C. The Owner shall make no deduction from the Surveyor's compensation on account of
penalties, liquidated damages or other sums withheld from the Contractor(s) through no
fault of the Surveyor.
Michael A. Benoit
P03-759
City of Renton January 31, 2003
Earlington Sewer Replacement Page 4
B. The Surveyor shall submit requests for payment monthly on forms provided and in a
manner prescribed by the Owner.
Article V. Compensation for Additional Services and Reimbursable
All additional services shall be authorized in writing prior to performance of the work.
A. Surveyor shall submit monthly requests for payment authorized additional services and
reimbursable expenses.
B. When requesting payment for additional services or reimbursable expenses, the Surveyor
shall submit an itemized billing showing unit cost and quantity of each item billed, and
referencing the specific authorizing document.
C. Additional Services shall be billed on an hourly basis using the hourly rates in effect at the
time the services are provided.
Article VI. Approval
If the above meets with your approval, please sign below and return one copy of this letter to our
office for our files. This scope and fee proposal reflects our understanding of the work at this
time. If you feel we do not accurately understand the project, please do not hesitate to let us
know. We appreciate the opportunity to submit this proposal, and look forward to discussing the
work in more detail with you. Please contact us if you need additional information.
Sincerely,
PENHALLEGON ASSOCIATES
CONSULTING ENGINEERS, INC.
Don F rdn
Principal Surveyor
Accepted for the City of Renton by:
Authorized Signature Title Date
PACE
11 Attachment A
Project Budget Worksheet
Project Name
Eadington Sewer Replacement Project
Prepared By: EMF
Project #:
P03-759
Billing Group
Location: I Earlington Area - Renton, WA
Date: 31-Jan-03
Drawing/
Labor Hours by Classification
Project
Project
Survey Project
Drawing/Task Title
Task
Manager
Engineer Engineer CADD Tech
Manager Surveyor Survey Crew: QA/QC
Admin
Admin Admin
Total
A. Research & Control
2 24 40
0.5
66.5
0.0
B. Calculations
4 60
0.5
64.5
0.0
C. Field Togographic Survey
40 264
1
305.0
0.0
D. Mapping
260
4 40
0.5
304.5
0,0
0.0
0.0
0.0
0.0
Total Hours
........
0,0:
0,0: 0.0:
260.0:
10.0: 164.0: 304,0: 6.0;
2.5:
77 0.0
740.5
Hourly Rate
$0.00
$0.00 $0.00
$73.00
$104.00 $88.00 $116.00 $0.00
$58.00
$0.00 $0.00
77=
Labor Total
$0
$0 $0
$18,980
$1,040 $14,432 $35,264 $0
$145
$0 $0
. .......... . . . . . . . . . ........... ........
.0 J
.. .................... ...........
. . ............... Labor Co $69,861.00
Expenses
rate/unit
Reimbursable
----------- ..........
Quantity Cost
Reprographics/Copying
Plotter
Photo/Video
Mileage j $0.35
912: $319.20
Utility Locate Service (APS) $75.00
80: $6,000.00
PerDiem
Total
$6 �31 9.20
File: 03759.xls, Fee Worksheet Page 1 of 1 Printed: 213/03, 3:22 PM
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
MEMORANDUM
DATE: February 27, 2003
TO: Mike Webby, HR & Rick Management Administrator
FROM: Mike Benoit iV6
SUBJECT: Earlington Sewer Replacement / Rehabilitation
Survey Contract
Please review the attached consultant contract agreement for insurance requirements. A response
by March 6, 2003 would be appreciated. If you have any questions, please contact me at Ext.
7206.
W:\WWP-27-3082 Earlington Sewer Rep] PH ]\Webby0l.doc\mab
.1 Y
CITY OF RENTON
♦ + 1055 S. GRADY WAY
RENTON, WA 98055
�IyTO
VENDOR:060869
PENHALLEGON ASSOC CONSULTING
750 6TH ST S
KIRKLAND, WA 98033
Page 1 1
DATE F18/0000256
NUMBER
3/7/03
SHIP TO:
FOB Point: Req. No.:
Terms: net term Dept.: PLNG/BLDG/PUB WKS UTILITY SYS
Req. Del. Date: Contact: FERKINGSTAD, LINDA
Pre -Assigned PO#?: NO
Special Inst:
Quantity I Unit Description __ Unit Price Ext. Price
THIS IS A REVISED PURCHASE ORDER _�.
CAG 03-024 Survey Earlington Sewer ia;T90 20
Replcmt
BILL TO
h l
SUBTOTAL 80,180.20
TAX 0.00
FREIGHT 0.00
TOTAL 80,180.20
Account Number I Work Order Function Number Amount 5,L1'
E 421.000400.018.5960.0035.65.045300 5405/5160 80,180.20
Authorized Signature Authorized Signature
Pagel 1
�Y
CITY OF RENTON
♦ ♦ 1055 S. GRADY WAY
RENTON, WA 98055
VENDOR:060869
PENHALLEGON ASSOC CONSULTING
750 6TH ST S
KIRKLAND, WA 98033
FOB Point:
Terms: net term
Req._Del. Date
Special Inst:
F S DATE, °" 4 �MBER_x$
3/7/2003 18/0000256
SHIP TO:
Req. No.:
Dept.: PLNG/BLDG/PUB WKS UTILITY SYS
Contact: FERKINGSTAD, LINDA
Pre -Assigned PO#?: NO
>c"M
CAGn03-024 Survey Earlingto4{n Sewer
76,180.20
}
yy��
— r'l,A.
-3
¢, " e b '!. rr- E�^ �F d
5�
3 3 a
'`f �61F �- S
�,''�
I
u".�£�aL�d.:
. I y i :^� 3 h •d
� �.. Y � G..:..d3i._�`.+_ 1�ru�S:. - � � "3
£.3gV"S „Y
d
l�� t.C.�,,a
`•^•,•xi
No le
3'"tliefu23.'n.+lme''-L�SFiY_3i�s.u�":.-e
�.
hUC-)
I
a�vc3:v.i'
..•33(�
?++�"i m
`��,h��'s $: 3yp��N^�` s{w�,.�EH�es�yF� '� Y.^•�t�+ +T t;:�a ��{3!,������y��� i����i:. :r�
q'?
���..v`%�"t'U� �7i�{ph���
����hr��v�' i
«::st.+F.e+i'-'u'�F..,.�
p xN L
r as � r
c�
-�4u;Ya
3
bnc`
' _. E
4f
�„��
`°i
r
j
_ pyah'ri�`5w��.i"+s+'=bi
'YS' t {E, .N3R 5"ha�_� if 'tr.-.. 7 ` �f r"i
S$
,
'Y�. .i. T?GIQ 4
�:a x _� "F
`�-.t��"'
., _. ,
.c:�; ., :.�,_ . m`�.�1�.'..,��.`ss...::i.v. .,. ,.. _ ��3..�_._ .v..
- . ,�
'�
d�'Y`��'�'„^�
-
^-
kg : ttxr r : '4 r�r'r-^; '�.rs ,. f �'-a`'
f
z
a.. T,--:.-
""^rl'T k
a, ""c '':. e fv Y
ram'.
..v .>_u ..s _--ir'S.
,
,,j,!�. _-
,c+x7'�' -" {' do-} 1�95"F ... i
7'k^Y -=d`
11
_
PrM rt
o _i a 4 tz
FORMER
m:�
MOVIE
y
HIM
iMMM
n
76,180.20
SUBTOTAL
BILL TO: TAX
0.00
FREIGHT
0.00
TOTAL
76,180.20
`Work]L J fd r Function Number
�.. .._ ��.,�, ,� _� ter. MM
:.,...WAmoun
E 421.000400.018.5960.0035.65.045300
5405/5160
76,180.20
Penhallegon Associates Consulting Engineers, Inc.
750 Sixth Street South, Kirkland, Washington 98033
Phone 425.827.2014
To: City Of Renton Attn: Mr. Mike Benoit ;SUN ` -'F 2-003
1055 S. Grady Way `SIT y c)F R N ► OKi
Renton, WA 98055 OTILITY SYSTEMS
Project: 03827 Earlington Sewer Replacement Project - TOPO Survey
Professional Services for the Period: 5/1/2003 to 5/31/2003
Billing Group: 10
-- Completed field survey
-- Delivered preliminary prints and electronic files
Contract Maximum:
Previous Billings Against Maximum:
Current Billings Against Maximum:
Balance After This Invoice:
Professional Services
Invoice
June 11, 2003
Invoice: 23899
$80,180.20
$74,774.20
$5,406.00
$0.00
Survey
Bill Hours
Bill Rate
Charge
Senior Project Surveyor
John F. Williamson
28.50
72.00
2,052.00
Project Surveyor
Fred M. Warner
15.50
80.00
1,240.00
Sr. Computer Technician
Ross Stolen
11.50
80.00
920.00
Party Chief
Connor Hammond
3.00
58.00
174.00
Instrument Person
Brian DeBoer
9.50
52.00
494.00
Instrument Person
Deborah Colombi
3.00
52.00
156.00
Instrument Person
Dwayne Barmettler
6.00
52.00
312.00
CAD Drafter
Dennis Boyd
1.00
58.00
58.00
Survey Total:
78.00
$5,406.00
Professional Services
Totals:
$5,406.06
Total Invoice Amount
$5,406.00
All invoices are due upon receipt. A service fee of 1.5% will be added to any unpaid balance after 30 days.
ery
CITY OF RENTON
1055 S. GRADY WAY
RENTON, WA 98055
VENDOR: 060869
PENHALLEGON ASSOC CONSULTING
750 6TH ST S
KIRKLAND, WA 98033
FOB Point:
Terms: net term
Req. Del. Date:
Special Inst:
CT'x.,, ' Pagel 1
DATE a :PO NUMBER
3/7/2003 18/0000956
SHIP TO:
Req. No.:
Dept: PLNG/BLDG/PUB WKS UTILITY SYS
Contact: FERKINGSTAD, LINDA
Pre -Assigned PO#?: NO
46
' e
Penhallegon Associates Consulting Engineers, Inc.
750 Sixth Street South, Kirkland, Washington 98033
Phone 425.827.2014
To: City Of Renton �ECEwV�
11 -�
Attn: Mr. Mike Benoit CC
MAY 2 Zo�3 DATE
1055 S. Grady Way
Renton, WA 98055 CITY OF NAME
UTILITY SYYS CMS TON:tri.1�
Project: 03827 Earlington Sewer Replacement Project - TOPO
Professional Services for the Period: 4/1/2003 to 4/30/2003
Billing Group: 10
Invoice
May 09, 2003
Invoice: 23655
TE
-- completed 90% fieldwork
-- completed 90% Cad work
Professional Services
Survey
Bill Hours
Bill Rate
Charge
Senior Project Surveyor
John F. Williamson
72.00
73.00
5,256.00
Project Surveyor
Fred M. Warner
18.00
80.00
1,440.00
Project Surveyor
Sheldon Gull
1.50
80.00
120.00
Sr. Computer Technician
Ross Stolen
23.00
80.00
1,840.00
Party Chief
Connor Hammond
114.00
58.00
6,612.00
Party Chief
Richard Willyerd
64.00
58.00
3,712.00
Instrument Person
Deborah Colombi
112.50
52.00
5,850.00
Instrument Person
Dennis Boyd
18.00
52.00
936.00
Instrument Person
Vance Marsten
64.00
52.00
3,328.00
Survey Technician I
Joseph E. Carnahan
87.50
65.00
5,687.50
Principal Surveyor
Dan P. Hallin
3.50
104.00
364.00
Principal Surveyor
Donald Fordney
1.00
104.00
104.00
Survey Totai:
579.00
$35,249.50
Professional Services Totals: $35,249.50
Reimbursables
Survey Charge
Mileage - Billable 151.90
Reimbursables Totals: $151.90
Total Invoice Amount $35,401.40
All invoices are due upon receipt. A service fee of] % will be added to any unpaid balance after 30 days.
April 2003
MILEAGE LOG: COMPANY VEHICLES
FOR MONTH OF APRIL 2003 TR #
JOB
BILL
AMOUNT @
LOG SHEET
PROJECT #
GROUP
TASK
OUT
IN
MILES
$ 0.351MILE
TOTAL
COMMENTS
81114
01777
03
414
423
9
$ 3.11
miles @ 0.345
81773
01777
03
844
850
6
$ 2.07
1
miles @ 0.345
81773
01777
03
52
62
10
$ 3.45
$ 8.63
miles @ 0.345
81114
01955
454
487
33
$ 11.56
$ 11.55
81114
01984
345
349
4
$ 1.40
$ 1.40
51353
01985
58
379
462
83
$ 29.05
51353
01985
58
462
534
72
$ 25.20
$ 54.25
51692
01985
59
719
726
7
$ 2.45
$ 2.45
81114
02860
198
219
21
$ 7.25
$ 7.25
miles @ 0.345
81114
02867
274
322
48
$ 16.80
81114
02867
349
414
65
1 $ 22.75
$ 39.55
81773
02885
886
914
28
$ 9.80
81773
02885
958
988
30
$ 10.50
$ 20.30
51216
03827
10
216
353
137
$ 47.95
miles over 30 @ 0.35
51353
03827
10
353
379
26
$ 9.10
miles over 30 @ 0.35
51544
03827
10
632
692
60
$ 21.00
miles over 30 @ 0.35
51692
03827
10
692
719
27
$ 9.45
miles over 30 @ 0.35
51692
03827
10
726
807
81
$ 28.35
miles over 30 @ 0.35
51802
03827
10
802
935
133
$ 46.55
$ 151.90
miles over 30 @ 0.35
81114
03830
219
274
55
$ 19.25
81773
03830
914
958
44
$ 15.40
$ 34.65
51802
03834
10
935
1028
93
$ 32.55
$ 32.55
51353
03838
10
534
544
10
$ 3.50
$ 3.50
51544
03841
10
544
605
61
$ 21.35
$ 21.35
81773
03845
10
865
886
21 S 7.35
$ 7.35
399.
t-
Vehicle: Nt G—j V A j
Beginning Odometer Reading:
MILEAGE LOG
Date
Initials
Project #
Task #
Project Name / Purpose
Odometer Reading
Start Stopuse
For Accounting
oni
'► "`Aar
d 3
Can
1-7
SI 2P�
S`r Z�3
AM0 3
c'
1w
Y
SP Lq-3
Si Z 7o
c—vE)L0-1 w EE K-
"'""""" PLEASE TURN IN SHEET TO ACCOUNTING Mileage Log.xis:4/11/02
Vehicle: "t� 6j V 4a�
Beginning Odometer Reading:
MILEAGE LOG
E 1 353
Date
Initials
Project #
Task #
Project Name / Purpose
Odometer Reading
Start
For Accounting
use Only
2Stop
-5
6 (3 71
s t 1%z.
85
9
U)
�1462-
534
-7:;4
1° Ap o3
L �y
15 q
10
Lv E,21 w e�- IC--
"""'" PLEASE TURN IN SHEET TO ACCOUNTING """""" Mileage Log.xls:4/11/02
►wuMyow M"scM ru cw..�ro�.v E�ph.w.. lr.c.
Vehicle: J b
Beginning Odometer Reading:
MILEAGE LOG
S1 J-4 4
Date
Initials
Project #
Task #
Project Name / Purpose
Odometer Reading
Start Stop
For Accounting
Use Only
14 A PB'- 3
ple,
� •-
5
4
r�
.0 53
Y
!S�
l 6S
�'
St G6.5
rs 2
<M Or
53 8 Ll
sb
Dr Reo,14m
S ab 3
t
-7
1� 2
3
evee j weEY--
""*'**** PLEASE TURN IN SHEET TO ACCOUNTING """""'" Mileage Log.xis:4/11/02
Vehicle: uo V bO J
Beginning Odometer Reading:
MILEAGE LOG
Date
Initials
Project #
Task #
Project Name / Purpose
Odometer Reading
Start Stop
For Accounting
Use Only
6392.-7
C -,, Or 40-r,��16'�Z
51719
a�
b N s
s ?1
s(7
-7
ti3
02-,
,o
C
7 0
8I
01)
f
17 °o
(o07
C-\J02-y weEV,�-
PLEASE TURN IN SHEET TO ACCOUNTING """"'"' Mileage Log.xls:4/11/02
Vehicle: ' W 61-1 41'4N
Beginning Odometer Reading:
MILEAGE LOG
Date
Initials
Project #
Task #
Project Name / Purpose
Odometer Reading
Start Stop
For Accounting
use Only
Z a 3
to
b3827
!:s
C -.. 0-�. a,v
8b2
10
ti
l
5 [
5 bps
�a o3
0 ° S
5 s
Cv E'e-Y w ee K-
}}}}}}}f}A PLEASE TURN IN SHEET TO ACCOUNTING !AfH """"" Mileage Log.xls:4/11/02
Page 1 1
Y
13� CITY OF RENTON
♦ ♦ 1055 S. GRADY WAY
RENTON, WA 98055
NT fv
VENDOR: 060869
PENHALLEGON ASSOC CONSULTING
750 6TH ST S
KIRKLAND, WA 98033
FOB Point:
Terns: net term
Req. Del. Date:
Special Inst:
DATEI PO NUMBER
3/7/2003 1 18/0000256
SHIP TO:
Req. No.:
Dept.: PLNG/BLDG/PUB WKS UTILITY SYS
Contact: FERKINGSTAD, LINDA
Pre -Assigned PO#?: NO
uatt .
_
Description Ail"Unit
CAG 03-024 Survey Earlington Sewer
Replcmt
u.- /0 - o o 3
Price
IExt- Price
76,180.20
a-
SUBTOTAL
TILL TO: TAX
FREIGHT
TOTAL
76,180.20
0.00
0.00
76,180.20
Account Numbe Work Order Function Number Amount
E 421.000400.018.5960.0035.65.045300 5405/5160 76,180.20
Y
660
Penhallegon Associates Consulting Engineers, Inc.
750 Sixth Street South, Kirkland, Washington 98033
Phone 425.827.2014
To: City Of Renton t;{�
°�0�
Attn: Mr. Mike Benoit '
1055 S. Grady Y Wa
`
Renton, WA 98055 !''` ``Y '''?
: -Invoice
April 08, 2003
i
i
Project: 03827 Earlington Sewer Replacement Project - TOPO Survey
Professional Services for the Period: 3/ l/2003 to 3/31/2003
Billing Group: 10
Invoice:
23348
-- completed 60% field work
-- completed 25% Cad work
Professional Services
Survey
Bill Hours
Bill Rate
Charge
Senior Project Surveyor
John F. Williamson
76.50
88.00
6,732.00
Project Surveyor
Sheldon Gull
1.00
80.00
80.00
Party Chief
Connor Hammond
72.50
58.00
4,205.00
Party Chief
Richard Willyerd
48.00
58.00
2,784.00
Instrument Person
Brian DeBoer
0.50
52.00
26.00
Instrument Person
Deborah Colombi
86.00
52.00
4,472.00
Instrument Person
Vance Marsten
93.00
52.00
4,836.00
Survey Technician I
Duane Briley
45.00
65.00
2,925.00
Survey Technician I
Joseph E. Camahan
27.50
65.00
1,787.50
Principal Surveyor
Dan P. Hallin
6.00
104.00
624.00
Principal Surveyor
Donald Fordney
9.00
104.00
936.00
Survey Project Manager
Neil Cabbage
4.00
96.00
384.00
Survev Total: 469.00
$29.791.50
Professional Services Totals:
$29,791.50
Outside Services
Survey
Charge
Applied Professional Svc.
9,487.50
Outside Services Totals:
$9,487.50
Reimbursables
Survey Charge
Mileage - Billable 93.80
Reimbursables Totals: . $93.80
Total Invoice Amount $39,372.80
All invoices are due upon receipt. A service fee of] % will be added to any unpaid balance after 30 days.
INVOICE
Aj�S
BILL TO:
APPLIED PROFESSIONAL
SERVICES INC.
Solutions That Exceed Expectations
43530 SE North Bend Way • North Bend, WA 98045
Phone:(425) 888-2490 Fax:(425) 888-2554
Toil Free: (866) 474-6446
PACE-SEATTLE
ATTN: FRED WILLIAMSON
1601 SECOND AVE
SUITE 1000
SEATTLE WA 98101
INVOICE NO. 0040674-IN
CUSTOMER _N6 PACOU$
Q ? 2003
SHIP TO:
JOB SITE LOCATION
LANGSTON/STEVENS/POWELL/
EARLINGTON
RENTON, WA
•__tom .:
03/31/2003 NET 30 DAYS
03827.10 03/31 /2003
mg
OUANTIITV rrEmwo. DESCRIPTION UNIT PRICE EXTENDED
115.000 LOCWA
PLEASE AMUVE
2.
PROJECT
DATE
WA UTILITY LOCATING PER ATTACHED
WORK PERFORMED: 3/10 - 3/28/03
75.000 8,625.00
Invoice Total: ���625.00
Terms: Net 30 Days 1.5% late charge on past due invoices.
REORDER FROM YOUR LOCAL SAFEGUARD DISTRIBUTOR. IF UNKNOWN, CALL 800-523-2422
M98SFOD0825M 1198
T_
APPLIED PROFESSIONAL
SERVICES INC.
A Als Solutions That Exceed Expectations
43530 SE North Bend Way - North Bend, WA 98045
Phone: (425) 888-2590 Fax: (425) 888-2554
LOCATE REQUEST
DATE: 715h 3:"PURCHASE ORDER #:g��
-
CUSTOMER: PHONE:
/000
BILLING ADDRESS: -City: 7re-E zip: 98fo
CONTACT PERSON: PHONE NUMBER: SX142_�
BILLING SUMMARY
DATE OF LOCATE: 8/o
LOCATOR'S NAME: Zw, Llw / C*weL IV I A
LOCATE ADDRESS:
DESCRIPTION OF LOCATE:
0)1-A)7,e AYX> 7iO77/C 516 Alo9t_ Ll 6&�IAlvc
TOTAL TIME -INCLUDING TRAVEL:
o.em JJE1
.7
"�6T�request
i is be Fe dWjOvae! ecK?S is - I knowledge Pf`. d�tq!' h
T,nA ffkfiigh6 mslms in 0 requested
JPPX 01; -_-z �., .. ". 1 11 1.6i..
01 i�ko
a other
TV,
ar&LAPS
dergro�hd dfilifiEk'w'%�fi n the 2� not ifiabld�lbrdam' y
type agetoan
U of IC
of facilityused by'such damage.
PAYMENT' T"ERMS: NET. 30.DAYS. I li2 PERCENT FINANCE CHARGE ON BALANCES OVER 30 DAYS.
CUSTOMER SIGNATURE:
LOCATOR SIGNATURE: ZZ DATE:',
March 2003
MILEAGE LOG: COMPANY VEHICLES
FOR MONTH OF MARCH 2O03
_
TR #
JOB
BILL
AMOUNT @
LOG SHEET
PROJECT #
GROUP
TASK
OUT
IN
MILES
$ 0.35/MILE
TOTAL COMMENTS
50493
01985
53
516
527
11
$ 3.85
$ 3.85
50493
01985
54
504
516
12
$ 4.20
$ 4.20
50598
01985
55
731
829
98
$ 34.30
$ 34.30
51081
01985
57
205
216
11
$ 3.85
$ 3.85
50541
02873
10
541
557
16
$ 5.60
50493
02873
1 10
493
504
11
$ 3.85
50493
02873
10
527
541
14
$ 4.90
$ 14.35
50598
03827
10
598
731
133
$ 46.55
50541
03827
10
557
598
41
$ 14.35
51081
03827
10
1081
1205
124
1 $ 43.40
$ 104.30
298
$ 93.80
miles over 30 ® 0.35
$ 164.85 $ 258.65
Vehicle: /f Iff V191`1
Beginning Odometer Reading: 6 1 O 8 1
MILEAGE LOG
Date
Initials
Project #
Task #
Project Name / Purpose
Odometer Reading
Start Stopuse
For Accounting
oni
2 iW AR-03
0 (
p 3 6.�7
/ 0
��NrsN �q,¢uN�
s / D & /
5 / J
f'
?-C
CVE) Y WEE IL
•"•«'•••` PLEASE TURN IN SHEET TO ACCOUNTING WHEN P r--ETo"r't «'�����«�� Mileage Log.xls:4/11/02
("p
Vehicle: ► W AN
MILEAGE LOG
Beginning Odometer Reading: 5 O 5 I
Date
Initials
Project #
Task #
Project Name / Purpose
Odometer Reading
Start Stop
For Accountlng
Use Only
dc�{{
3mA�o�
O `Lt 8�3
0
2� zP�7c�
s i
5 o 5
k-
cb1.$7 3
lo
`7
7 ab�
ti�
o38Z'l
b
�f ►-�� (>
� 0
wwwww►wwww PLEASE TURN IN SHEET TO ACCOUNTING ""'"""" Mileage Log.xls:4/11/02
Vehicle: IJ CCU UA,*J
11:= f
Beginning Odometer Reading: I `"" -'' .� ,
MILEAGE LOG
Date
Initials
Project #
Task #
Project Name / Purpose
Odometer Reading
Start Stop
For Accounting
use Onl
3�>
`l
w
r1
✓1
d I
b 7 J
►� �^a"`�
("A
VIOL
5S
5 s �
3 i
562L�
a
"•"•""•' PLEASE TURN IN SHEET TO ACCOUNTING W f ""'""""" Mileage Log.xls:4/11/02
CITY OF RENTON
EFK:,V*�OV HUMAN RESOURCES & RISK MANAGEMENT
DEPARTMENT
MEMORANDUM
DATE: April 23, 2003
TO: Joh44.bson, Utility Systems
FROM: Mi Webby, HR&RM Administrator
SUBJECT: Insurance Renewal Review/ Penhallegon Associates
Consulting Engineers
Earlington Sewer Replacement
I have reviewed the certificate of insurance for the above -mentioned contract. The insurance
coverage, provided for this contract, meets the City's risk management requirements.
RECEIVED
APR 2 4 2003
CITY OF RENTON
UTILITY SYSTEMS
ACORD
TM. CERTIFICATE OF LIABILITY INSURANCE
DATE (MM/DD/YY)
APR 1703
PRODUCER
MICHAEL J. HALL & COMPANY
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
19578 10TH AVENUE N.E.
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
POULSBO WA 98370
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
PHONE: (360)598-3700
FAX: (360) 5983703 Agency Lic#: 91-1461089
INSURERS AFFORDING COVERAGE
NAIC #
INSURED
INSURER A: HARTFORD FIRE INSURANCE COMPANY
INSURER B: CNA INSURANCE COMPANY
PENHALLEGON ASSOCIATES CONSULTING
ENGINEERS, INC.
750 SIXTH STREET SOUTH
INSURER C:
INSURER D:
KIRKLAND WA 98033
INSURER E:
rnvFRAnP_q
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES, AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS,
INS
LTR
TYPE OF INSURANCE
POLICY NUMBER
POLICY EFFECTIVE
DATE MM/DD
POLICYEXPIRATION
DATE MWDD
LIMITS
A
GENERAL LIABIUTY
X COMMERCIAL GENERAL LIABILITY
CLAIMS MADE IX] OCCUR
52SBADE5745
APR 27 03
APR 27 04
EACH OCCURRENCE
$ 2,000,000
DAMAGE TO RENTED
PREMISES Ea occurs
$ 300,000
MED. EXP (Any One Person)
$ 10,000
PERSONAL & ADV INJURY
$ 2,000,000
GENERAL AGGREGATE
$ 410009000
GEN'L AGGREGATE LIMIT APPLIES PER:
X POLICY
PRODUCTS-COMP/OP AGG.
$ 4,000,000
A
AUTOMOBILE
LIABILITY
ANY AUTO
ALL OWNED AUTOS
SCHEDULED AUTOS
HIRED AUTOS
NON -OWNED AUTOS
52SBADE4745
APR 27 03
APR 27 04
COMBINED SINGLE LIMIT
(Ea accident)
$ 2,000,000
BODILY INJURY
(Per person)
$ 0
X
BODILY INJURY
(Per accident)
$
X
PROPERTY DAMAGE
$ 0
GARAGE LIABILITY
ANY AUTO
AUTO ONLY - EA ACCIDENT
$ 0
OTHER THAN EA ACC
AUTO ONLY: AGG
$ 0
$ 0
A
EXCESS / UMBERELLA LIABILITY
X OCCUR CLAIMS MADE
DEDUCTIBLE
RETENTION $
52SBADE5745
APR 27 03
APR 27 04
EACH OCCURRENCE
$ 19000,000
AGGREGATE
$ 19000,000
$ 0
$
$
A
WORKERS COMPENSATION AND
EMPLOYERS' LIABILITY
ANY PROPRIETOR/PARTNERIEXECUTIVE
OFFICER/MAMBER EXCLUDED?
If yo, do Abe under
SPECAAL PROVISIONS bolo.
52SBA DE5745
APR 27 03
APR 27 04
TORYTLIMITS
OTHER
E.L. EACH ACCIDENT
$ 1,000,000
E.L. DISEASE -EA EMPLOYEE
$ 1,000,000
E.L. DISEASE -POLICY LIMIT
$ 1,000,000
B
OTHER:
PROFESSIONAL LIABILITY
CLAIMS MADE FORM
PRA 11 399 75 87
APR 27 01
APR 27 04
$1,000,000 EACH CLAIM
$1,000,000 AGGREGATE
RETRO DATE 04127/92
DESCRIPTION OF OPERATIONS/LOCATIONIVEHICLES/EXCLUSIONS ADDED ENDORSEMENT/ SPECIAL PROVISIONS
PROJECT: EARLINGTON SEWER REPLACEMENT
THE CERTIFICATE HOLDER IS ADDITIONAL INSURED ON THE GENERAL LIABILITY POLICY AS RESPECTS WORK DONE BY, OR ON BEHALF
OF, THE NAMED INSURED. SEE ATTACHED
CFRTIFICATF HOI nFR I I ADDITIONAL INSURED; INSURER LETTER: CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED, OR MATERIALLY
CHANGED, BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL
MAIL 45 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT.
CITY OF RENTON
1055 SOUTH GRADY WAY
RENTON, WA 98055
AUTHORIZED REPRESENTATIVE
Q
Attention: MICHAEL BENOIT
ACORD 25 (2001108) Certificate # 19436 ASHLEY HURD
POLICY NUMBER: 52SBADE5745 COMMERCIAL GENERAL LIABILITY
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
ADDITIONAL INSURED -OWNERS, LESSEES OR
CONTRACTORS (Form B)
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY
SCHEDULE
Name of Person or Organization; CITY OF RENTON
1055 SOUTH GRADY WAY
RENTON, WA 98055
(If no entry appears above. information required to complete this endorsement will be shown in the
Declarations as applicable to this endorsement.)
WHO IS AN INSURED (Section II) is amended to include as an insured the person or organization
shown in the Schedule, but only with respect to liability arising out of "your work' for that insured by
or for you
CG 20 10 11 85 Copyright. Insurance Services Office, Inc., 1984
Certificate # 19436
40
gWL
Jesse Tanner, Mayor
March 6, 2003
Don Fordney
Penhallegon Associates Consulting Engineers, Inc.
1601 Second Avenue, Ste. 1000
Seattle, WA 98101-3511
CITY OF RENTON
PlanninouildingTublicWorks Department
Gregg Zimmerman P.E., Administrator
SUBJECT: REQUEST FOR SURVEY SERVICES FOR THE EARLINGTON SEWER
REPLACEMENT PROJECT
Dear Don:
Enclosed for your records is an original survey contract for the Earlington Sewer Replacement project.
If you have any questions, please call me at 425-430-7206.
Sincerely,
Michael A. Benoit
Wastewater Utility Engineer
Enclosures
H-\File Sys\WWP - Wastewater\WWP-27-3082 F,arlington Sewer Rep I PH I\PaceO3.doc\MAR-If
1055 South Grady Way - Renton, Washington 98055
® This paper contains 50 % recycled material, 30 % post consumer
RENTON
AHEAD OF THE CURVE
ACORD OF LIABILITY INSURANCE DATE
TM. APR1703
-CERTIFICATE
PRODUCER
MICHAEL J. HALL & COMPANY
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
19578 10TH AVENUE N.E.
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
POULSBO WA 98370
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
PHONE: (360)5983700
FAX: (360) 5983703 Agency Lic#: 91-1461089
INSURERS AFFORDING COVERAGE
NAIC #
INSURED
INSURER A: HARTFORD FIRE INSURANCE COMPANY
PENHALLEGON ASSOCIATES CONSULTING
INSURER B: CNA INSURANCE COMPANY
ENGINEERS, INC.
750 SIXTH STREET SOUTH
INSURER C:
INSURER D:
KIRKLAND WA 98033
INSURER E:
COVERAGES
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
LTR
TYPE OF INSURANCE
POLICY NUMBER
POLICY EFFECTIVE
DATE MWDD
POLICY EXPIRATION
DATE MM/DD
LIMITS
A
GENERAL LIABIUTY
XCOMMERCIAL GENERAL LIABILITY
CLAIMS MADE IX] OCCUR
52SBADE5745
APR 27 03
APR 27 04
EACH OCCURRENCE
$ 2,000,000
RNT:.a MGSTO Ea
$ 300,000
MED. EXP (Any One Person)
$ 10,000
PERSONAL & ADV INJURY
$ 2,000,000
GENERAL AGGREGATE
$ 4,000,000
GEN'L AGGREGATE LIMIT APPLIES PER:
X POLICY
PRODUCTS-COMP/OP AGG.
$ 4,000,000
A
AUTOMOBILE
LIABILITY
ANY AUTO
ALL OWNED AUTOS
SCHEDULED AUTOS
HIRED AUTOS
NON -OWNED AUTOS
52SBADE4745
APR 27 03
APR 27 04
COMBINED SINGLE LIMIT
(Ea accident)
$ 2,000,000
BODILY INJURY
(Per person)
$ 0
X
BODILY INJURY
(Per accident)
$ 0
X
PROPERTY DAMAGE
$ 0
GARAGE LIABILITY
ANY AUTO
AUTO ONLY - EA ACCIDENT
$ 0
OTHER THAN EA ACC
AUTO ONLY: AGG
$ 0
$ 0
A
EXCESS / UMBERELLA UABILITY
X OCCUR CLAIMS MADE
DEDUCTIBLE
RETENTION $
52SBADE5745
APR 27 03
APR 27 04
EACH OCCURRENCE
$ 1,000,000
AGGREGATE
$ 1,000,000
$ 0
$
$
A
WORKERS COMPENSATION AND
EMPLOYERS' LIABILITY
ANY PROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MAMBER EXCLUDED?
N yos, dosvlbo under
SPECIAL PROVISIONS below
52SBA 9E5745
APR 27 03
APR 27 04
OT RYTLIMITS OTHER
E.L. EACH ACCIDENT
$ 1,000,000
E.L. DISEASE -EA EMPLOYEE
_
$ 1,000,000
E.L. DISEASE -POLICY LIMIT
$ 1,000,000
B
OTHER:
PROFESSIONAL LIABILITY
CLAIMS MADE FORM
PRA 11 399 75 87
APR 27 01
APR 27 04
$1,000,000 EACH CLAIM
$1,000,000 AGGREGATE
RETRO DATE 04/27/92
DESCRIPTION OF OPERATIONS/LOCATION/VEHICLES/EXCLUSIONS ADDED ENDORSEMENT/ SPECIAL PROVISIONS
PROJECT: EARLINGTON SEWER REPLACEMENT
THE CERTIFICATE HOLDER IS ADDITIONAL INSURED ON THE GENERAL LIABILITY POLICY AS RESPECTS WORK DONE BY, OR ON BEHALF
OF, THE NAMED INSURED. SEE ATTACHED
CERTIFICATE HOLDER I I ADDITIONAL INSURED; INSURER LETTER: CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED, OR MATERIALLY
CHANGED, BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL
MAIL 45 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT.
CITY OF RENTON
1055 SOUTH GRADY WAY
RENTON, WA 98055
AUTHORIZED REPRESENTATIVE
�
Attention: MICHAEL BENOIT
ACORD 25 (2001108) Certificate # 19436 ASHLEY HURD
POLICY NUMBER: 52SBADE5745
COMMERCIAL GENERAL LIABILITY
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
ADDITIONAL INSURED -OWNERS, LESSEES OR
CONTRACTORS (Form B)
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY
SCHEDULE
Name of Person or Organization; CITY OF RENTON
1055 SOUTH GRADY WAY
RENTON, WA 98055
(If no entry appears above. information required to complete this endorsement will be shown in the
Declarations as applicable to this endorsement.)
WHO IS AN INSURED (Section II) is amended to include as an insured the person or organization
shown in the Schedule, but only with respect to liability arising out of "your work' for that insured by
or for you
CG 20 10 11 85 Copyright. Insurance Services Office, Inc., 1984
Certificate # 19436
CRITY Off' Rom+ NTON
..tl
6 Planning/Building/PublicWorks Department
Jesse Tanner, Mayor. Gregg Zimmerman P.E., Administrator
January 22, 2003
Don Fordney
Penhallegon Associates Consulting Engineers, Inc.
1601 Second Avenue, Ste. 1000
Seattle, WA 98101-3511
SUBJECT: REQUEST FOR SURVEY SERVICES FOR THE EARLINGTON SEWER
REPLACEMENT PROJECT
Dear Don:
I am writing to request a proposal to perform survey work for use in sanitary sewer replacement projects
in the Earlington area. I have enclosed an exhibit map showing the area of survey coverage needed for
the new base maps.
The base map for this proposal is approximately 15,200 feet in length; 3,200 feet of the survey is along
existing sewers that are not in right-of-way. Plan on mapping to twenty feet on either side of existing
sewers.
The remaining 12,000 feet of the survey is in right-of-way. For the majority of this survey, plan on `all
data and 10 feet beyond the right-of-way'. For the side streets and sewers that intercept into Sunset Blvd,
plan to continue the width of the survey out into Sunset. For the 500 feet along Sunset and any other
work entering that street, plan on just surveying the north half of the road.
The scope should be similar to the one that was recently prepared for John Hobson's East Kennydale
Sewer Infill Project (not including the as -built portion). Since the scope may have been prepared in
Kirkland, I am sending a copy to you.
I have also enclosed the following information that I found in our system, for your use:
• King County Assessor Maps encompassing the new base map areas.
• Plat Maps surrounding the new base map areas.
• All available utility design and as -built drawings for the associated areas.
• City of Renton survey benchmarks and monument information.
If you have any questions, please call me at 425-430-7206.
Sincerely,
Michael A. Benoit
Wastewater Utility Engineer
Enclosures
\\nAFDAI I IS\SVS7\SHARFD\File'yc\WWP - WacteWater\WWP-77-3OR7 Farlingtnn CPwer Repi PH i\ParrM rinC� B �T T O N
1055 South Grady Way - Renton, Washington 98055 1` 1 �1
®This paper contains 50 %recycled material, 30 % post consumer
AHEAD OF THE CURVE