HomeMy WebLinkAboutWWP273162 (6)Sunset Interceptor, Phase 3
July 21, 2005
Inserts for Contract Specifications
<INSERT 1>
The work shall also include the installation and/or replacement of the storm and sanitary sewer system,
including but not limited to installing catch basins, storm and sanitary sewer manholes and pipes, side
sewers; furnishing, installing and maintaining erosion control measures, providing traffic control, and
patching and restoring all disturbed area.
Duvall Avenue NE/SR 900 July. 2005
Intersection Improvement Project
<INSERT 2>
DUVALL AVENUE NE/SR 900 (SUNSET BLVD)
INTERSECTION IMPROVEMENT PROJECT
Schedule of Prices
(Note: Unit prices for all items, all ertensions, and total amount of bid must be shown. All entries must be written or entered in
ink. Show unit prices in both xords and figures and inhere conflict occurs, the written or typed words shall prevail)
Schedule B
ITEM
APPROX.
UNITS
ITEM WITH UNIT PRICED BID
UNIT PRICE
AMOUNT
No.
QUANTITY
Unit Prices to be 6Vritten in Words
DOLLARS CTS
DOLLARS CTS
1
1
LS
Mobilization & Demobilization
1-09.7
$
$
$
Per Lump Sum
2
1
LS
Trench Excavation Safety System
2-09
$
$
$
Per Lump Sum
3
1
LS
Temporary Erosion/Sedimentation
Controls 8-01
Per Lump Sum
4
1
LS
Construction Surveying, Staking,
And As-builts 1-05
Per Lump Sum
5
1
LS
Landscape Restoration
8-02
Per Lump Sum
6
1255
LF
Television Inspection of Sanitary
Sewers 7-17
$
$
$
Per Lineal Foot
7
1200
LF
15-Inch Diameter PVC Sewer Pipe
7-17
$
$
$
Per Lineal Foot
8
55
LF
8-Inch Diameter PVC Sewer Pipe
7-17
Per Lineal Foot
9
200
LF
6-Inch Diameter PVC Side Sewer
Pipe 7-18
Per Lineal Foot
Duvall Avenue NFJSR 900 I July, 2005
Intersection Improvement Project
DUVALL AVENUE NE/SR 900 (SUNSET BLVD)
INTERSECTION IMPROVEMENT PROJECT
Schedule of Prices
(Note: Unit prices for all items, all ertensions, and total amount of bid must be shown. All entries must be written or entered in
ink. Show unit prices in both words and figures and where conflict occurs, the written or typed x-ords shall prerail.)
Schedule B (continued)
ITEM
APPROX.
UNITS
ITEM WITH UNIT PRICED BID
UNIT PRICE
AMOUNT
No.
QUANTITY
Unit Prices to be Written in Words
DOLLARS CTS
DOLLARS CTS
10
3
EA
54-Inch Diameter Sanitary Sewer
Manhole 7-05
Per Each
11
5
EA
48-Inch Diameter Sanitary Sewer
Manhole 7-05
$
$
$
Per Each
12
I
EA
48-Inch Diameter Cut -in Sanitary
Sewer Manhole 7-05
Per Each
13
5
EA
Connections to Existing Manholes
7-05
Pef Lump Sum
14
20
CY
Ab'an-Eyisnng Sanitary Sewer
Main 7-05
Per Cubic Yard
15
4
EA
Abandon Existing Sanitary Sewer
Manhole 7-05
$
$
$
Per Each
16
70
Ton
Foundation Gravel
7-10
Per Ton
17
1570
Ton
Select Imported Trench Backfill
7-10
Per Ton
18
340
Ton
Crushed Surfacing Top Course
4-04
$
$
Per Ton
Duvall Avenue N E/SR 900 2 July, 2005
Intersection Improvement Project
DUVALL AVENUE NE/SR 900 (SUNSET BLVD)
INTERSECTION IMPROVEMENT PRO.IECT
Schedule of Prices
(Note: Unit pricer for all items, all e-rtensions, and total antount of bid Hurst be shown. A11 entries must be written or entered in
ink. Shoiv emit prices in both words and figures and x,here conflict occurs, the written or typed words shall prevail.)
Schedule B (continued)
ITEM
APPROX.
UNITS
ITEM WITH UNIT PRICED BID
UNIT PRICE
AMOUNT
No.
21JANTITY
(Unit Prices to be Written in Words
DOLLARS CTS
DOLLARS CTS
19
250
Ton
Asphalt Concrete Patch Class B
5-04
Per Ton
20
20
SY
Remove/Replace Concrete Sidewalk
& Driveways 8-14
Per Square Yard
21
30
LF
Remove/Replace Concrete Curb
& Gutter 8-04
Per Lineal Foot
Total of extended amount in words:
and
Total Schedule B
Cents.
Dollars
THE UNDERSIGNED BIDDER HEREBY AGREES TO COMMENCE WORK ON THIS PROJECT,
IF AWARDED HIM, NO LATER THAN 10 DAYS AFTER FINAL EXECUTION AND TO
COMPLETE THE WORK WITHIN 150 CALENDAR DAYS.
Dated at
this day of 2005
Duvall Avenue iNF:/SR 900 ' 3 July, 2005
Intersection Improvement Project
<INSERT 3>
City of Renton
Duvall Avenue NE/SR 900 (Sunset Blvd) Intersection)
Improvement Project
Amendments to the Standard Specifications
Schedule B — Sanitary Sewer Improvements
The amendments in the following section apply to the Sanitary Sewer Main Improvements associated
with Schedule B. These amendments are in addition to the other information contained in this Contract.
Any inconsistencies in the parts of the contract shall be resolved as described in Section 1-04.2 of the
Special Provisions with these amendments falling between the Proposal Form and the Special Provisions.
1-01 DEFINITIONS AND TERMS
1-01.3 Definitions
Section 1-01.3 is revised and supplemented by the following:
CITY
The City of Renton
1-04 SCOPE OF THE WORK
1-04.12 Hours of Work
This new section is added as follows:
General hours of work for the Project shall be limited to the hours of 7:00 a.m. to 5:00 p.m. The Hours
of work may be changed at the discretion of the Engineer when it is in the interest of the public or the
Contractor due to reasons of safety, health and welfare and must be approved in writing prior to the start
of work. The Contractor shall give a minimum of 48 hours notice to the Contracting Agency prior to
work on any roadway and shall do no work on the roadway without a traffic control plan approved by the
City Transportation Division.
1-05 CONTROL OF WORK
1-05.4 Conformity with and Deviations from Plans and Stakes
Delete the first sentence of the first paragraph of this section and replace with the following:
The Contractor shall lay out and set any construction stakes and marks needed to establish the lines,
grades, slopes, and cross -sections.
1-05.5 Construction Stakes (APWA Only)
1=05.5(1)A General (APWA Only)
The first paragraph is revised to read:
The Contractor shall provide all construction stakes and marks establishing lines, slopes, and grades as
stipulated in Sections 1-05.4, and 1-05.5. The Contractor shall assume full responsibility for detailed
dimensions, elevations, and excavation slopes measured from all furnished stakes and marks. All costs
of this survey work shall be incidental to other bid items.
1-05.5(2) Road and Utility Surveys (APWA Only)
Add the following to the set of information to be furnished by the Contractor
E. Sanitary sewer and water line alignment and grade stakes (50' max, interval for laser
control, 30' max. interval for batter boards)
City of Renton Amendments — Schedule B Only
1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC
1-07.16(1) Private/Public Property
Section 1-07.16(1) is supplemented by adding the following:
Private property such as plants, shrubs, trees, fences, and rockeries within the work area shall be removed
and restored to the satisfaction of the property owner. It shall be the Contractor's responsibility to notify
each property owner when it is necessary to remove such improvements to facilitate the Contractor's
progress, and to remove those improvements to locations requested by the property owner or to restore
them to near original location in as near original condition as possible.
For the purpose of this contract, all property not within the Right of Way, including property owned by
the City of Renton, shall be considered private property.
The Contractor shall notify all property owners along the construction area, by mail, prior to the start of
construction. Names and addresses will be furnished by the Owner. The Contractor shall further notify
each occupancy in person a minimum of three days prior to construction adjacent to each property.
1-07.16(2) Vegetation Protection and Restoration
Section 1-07.16(2) is supplemented by adding the following:
All lawn within the area to be disturbed by the Contractor's operations shall be cut with a sod -cutting
machine, removed and disposed. The disturbed lawn area shall be restored with sod, after trench is
backfilled and compacted. The restoration of the distributed lawn area shall be performed under the
following guidelines:
A. Topsoil shall be placed at a depth of 3 inches.
B. Topsoil shall be tilled to a depth sufficient to key into the ked to a smooth even
grade without low areas to trap water and compacted l as approved by
the Engineer.
C. Sod strips shall be placed within 48 hours of being cut. Placement shall be without voids
and shall have the end joints staggered. The sod shall be rolled with a smooth roller
following placement.
D. Barriers shall he erected, with warning signs where necessary, to preclude pedestrian
traffic from access to the newly placed lawn during the establishment period.
E. The watering schedule of all newly laid sod shall be four times a week for three weeks.
The watering shall be such duration as to soak the replaced sod thoroughly and promote
good root growth.
F. Such removal, complete restoration and maintenance of the lawn shall be considered
incidental to other items of work and no further compensation shall be made.
1-07.17 t1tilities and Similar Facilities
Section 1-07.17 is supplemented by adding the following:
City of Renton Amendments - Schedule B Only
The Contractor shall provide written notification to the Engineer whenever an adjustment to the new
sewer line location or grade is known to be required in order to avoid conflicts.
Locations and dimensions shown in the plans for existing buried facilities are in accordance with
available information obtained without uncovering, measuring, or other verification. The Contractor shall
be responsible for determining their exact location. All utilities should be potholed to locate them
horizontally and vertically a sufficient time in advance of the pipe excavation, removal, and laying
operation to allow adjustments to be made as necessary to avoid conflicts. Contractor shall be
responsible for identifying such conflicts reasonably in advance of his construction efforts.
1-09 MEASUREMENT AND PAYMENT
For Schedule B, Section 1-09 is revised and supplemented as follows:
1-09.14 Payment Schedule (Additional Section)
1-09.14(1) Scope
Payment for the various items of the Bid Sheets associated with Schedule B, as further specified herein,
shall include all compensation to be received by the CONTRACTOR for furnishing all tools, equipment,
supplies, and manufactured articles, and for all labor, operations, and incidentals appurtenant to the items
of work being described, as necessary to complete the various items of the work in accordance with the
requirements of the Contract Documents, including all appurtenances thereto, and including all costs of
compliance with the regulations of public agencies having jurisdiction, including but not limited to
Safety and Health Administration of the U.S. Department of Labor (OSHA). Separate payment shall not
be made for any item that is not specifically set forth in the Bid Schedules and all costs therefore shall be
included in the prices named in the Bid Schedules for the various appurtenant items of work.
1-09.14(2) Mobilization & Demobilization
Mobilization and Demobilization shall be measured as a lump sum and shall include the establishment of
all site improvements required to begin construction associate with Schedule B, including: project
schedule, and transportation of equipment to the project site, receipt of all bonds and insurance policies,
obtaining all required permits, along with any other submittal and shop drawing requirements, provide
protection of existing facilities and removal of all materials and equipment from the construction site
after project completion.
Mobilization and Demobilization shall be paid as described in Section 1-09.7 and as modified in these
documents.
1-09.14(3) Trench Excavation Safety Systems
Section 2-09.4 is revised and supplemented as follows:
Shoring or Extra Excavation. Measurement for trench excavation safety systems shall be based on a
percentage defined as the amount of sanitary sewer pipelines installed divided by the total length of
sanitary sewer pipe shown to be installed.
Section 2-09.5 is revised and supplemented as follows:
City of Renton Aniendments — Schedule Q Only 3
Shoring or Extra Excavation. Payment for trench excavation safety systems shall be made at the
measured percentage amount for the pay period times the lump sum amount bid. Said payment shall be
complete compensation for all equipment, labor, materials, hauling, planning, design, engineering,
submittals, furnishing and constructing and removal and disposal of such temporary sheeting, shoring,
and bracing complete as required under the provisions of any permits and in the requirements of OSHA
and RCW Chapter 49.17, etc. required to complete this item of work in conformance with the Contract
Documents.
1-09.14(4) Temporary Erosion/Sedimentation Controls
Delete the fifteenth paragraph of Section 1-07.15 and replace Section 8-01.4 with the following:
Measurement for temporary erosion/sediment control(s) shall be based on the percentage of total work
complete for Schedule B, by dollar value, at the time of measurement.
Replace Section 8-01.5 with the following:
Payment for temporary erosion/sedimentation control(s) shall be at the lump sum amount bid multiplied
times the measured percentage of total work completed for the contract. Said payment shall be complete
compensation for all labor, materials, equipment, straw -bale dikes, silt fencing, plastic sheeting, etc.
required to complete this item of work in conformance with Contract Documents.
1-09.14(5) Construction Surveying, Staking, and As-builts
Measurement for construction surveying, staking and as -built information shall be based on the
percentage of total work complete, by dollar value, at the time of measurement.
Payment for construction surveying, staking and as -built information shall be at the lump sum amount bid
multiplied times the measured percentage of total work completed for the contract. Said payment shall
be complete compensation for all labor, materials, equipment, travel, surveying needed to construct the
improvements to the line and grade as shown on the plans, to provide the required construction and as -
constructed field (as -built information) notes and drawings, etc. required to complete this item of work in
conformance with the Contract Documents. No more than 50% of the bid amount for this item shall be
paid prior to the review and acceptance of the as -constructed information by the Engineer.
1-09.14(6) Landscape Restoration
Replace Section 8-02.4 with the following:
Measurement for landscape restoration shall be per lump sum of landscape restored as required to
complete this item in conformance with the Contract Documents.
Replace Section 8-02.5 with the following:
Payment for landscape restoration shall be per lump sum, which payment shall be complete
compensation for all labor, equipment, materials, materials hauling, sod, topsoil, preparation, forming,
placement, finishing, watering, cleanup, etc. required to compete this item in conformance with the
Contract Documents.
City of Renton Amendments - Schedule B Only 4
1-09.14(6) Television Inspection of Sanitary Sewers
Section 7-17.4 is revised and supplemented as follows:
Measurement for television inspection of the new sewers shall be based on the lineal feet of pipe
inspected.
Section 7-17.5 is revised and supplemented as follows:
Payment for television inspection of the new sewers in accordance with Section 7-17.3(2)H shall be
made at the amount bid per linear foot. Said payment shall be considered complete compensation for all
labor, materials, and equipment required to perform a television inspection of the pipe and to prepare a
videotape record of all new sanitary sewers constructed under this contract. Contractor shall bear all
costs incurred in correcting any deficiencies found during testing, including the cost of any additional
testing that may be required by the Owner to verify the correction of said deficiency. The Contractor
shall be responsible for all costs incurred in any television inspection performed solely for the benefit of
the Contractor.
1-09.14(7) 5--Inch Diameter PVC Sewer Pipe
Measurement for furnishing and installing /-!:5-- inch diameter sanitary sewer pipe shall be per Section
7-17.4 for each size and type of pipe required.
Section 7-17.5 is revised and supplemented as follows:
Payment for furnishing and installing sanitary sewer pipe shall be made at the amount bid per linear foot.
Said payment shall be complete compensation for all labor, materials, and equipment required to furnish
and install the pipe of the size and type required. Work shall also include but not be limited to any
hauling; pavement cutting; asphalt or cement concrete pavement removal; temporary traffic control,
dewatering; bypass pumping of existing sanitary sewage; casing the sewer pipe at water main crossings
with insufficient separation; removal and disposal of waste material; placement, maintenance and
removal of temporary pavement patching; and testing pipe (exfiltration or low pressure air tests and
deflection testing) required to complete the work in accordance with the Contract Documents.
Furnishing and installing pipe bedding; backfilling with native materials, and compacting all backfill
shall also be included in this bid item. Select imported trench backfill materials shall be paid under other
bid items.
1-09.14(8) 6-Inch Diameter PVC Side Sewer Pipe
Measurement shall be as specified in Section 7-18.4:
Delete Section 7-18.5. Payment shall be as specified in Sections 1-09.14(7) and 7-17.5.
1-09.14(9) 54-Inch Diameter Sanitary Sewer Manhole
Section 7-05.4 is revised and supplemented as follows;
Measurement for furnishing and installing , =inch sanitary sewer manholes shall be per each for each
type manhole installed in conformance with the Contract Documents. Measurement of manhole heights
for payment purchases shall be the distance from the finished rim elevation to the invert of the lowest
outlet pipe.
Clt} of Renton Amendments - Schedule H Only
Section 7-05.5 is revised and supplemented as follows;
Payment for furnishing and installing inch sanitary sewer manholes of the size required shall be
made at the unit price bid per each. Said payment shall be complete compensation for all labor,
equipment, and materials required to furnish and install the manhole of the size required. Work shall
also include but not be limited to any hauling; pavement cutting; asphalt or cement concrete pavement
removal; dewatering; removal and disposal of waste material; placement, maintenance and removal of
temporary pavement patching; adjusting frames to grade; channeling manhole, testing manhole, and
connecting manhole to new and/or existing pipes required to complete all manholes in conformance with
the Contract Documents. Furnishing and installing foundation material, backfilling with native material,
and compacting native backfill shall also be included in this bid item. Payment for cut -in manholes shall
also include the cost of bypassing sewage as necessary to complete the installation. Select imported
trench backfill materials shall be paid under other bid items.
Each manhole shall include but not be limited to a concrete base, precast concrete manhole sections,
gaskets, coating system (sealer), manhole frame and lid, ladder and rungs, and other associated
appurtenances.
1-09.14(10) Connections to Existing Manholes
Section 7-05.4 is revised and supplemented as follows;
Measurement for connecting the new sewer main to an existing manhole shall be per each for connection
made in conformance with the Contract Documents.
Section 7-05.5 is revised and supplemented as follows;
Payment for connections to existing manholes shall be made at the unit price bid per each. Said payment
shall be complete compensation for all labor, equipment, and materials required to make each
connection. Work shall include but not be limited to excavating around and protecting the existing
manhole; core drilling for the new connection, rechanneling the existing manhole; removing the existing
manholes if necessary; furnishing and installing any fittings and/or adaptors; hauling any materials;
disposing of waste material; relocating ladder and rungs if necessary; making all pipe to manhole
connections; placing subsequent native backfill; compacting backfill; cleaning; and testing required to
complete all the connections in conformance with the Contract Documents. Select imported trench
backfill materials are included in other bid items.
1-09.14(11) Abandoning Existing Sanitary Sewer Main
Section 7-05.4 is revised and supplemented as follows;
Abandoning existing gravity sewers shall be measured by the cubic yards of Controlled Density Fill
required to completely fill the pipes being abandoned.
Section 7-05.5 is revised and supplemented as follows;
Payment for abandoning the existing sanitary sewer pipes shall cover the complete cost of providing all,
labor, materials, and equipment required to fill and plug the identified existing sanitary sewer mains.
The work shall include but not be limited to furnishing, delivering, and placing the controlled density fill
('sty of Renton Amendments Schedule B Only 6
and installing permanent and temporary plugs and blocks as needed to ensure that the pipes being
abandoned are completely filled with controlled density fill.
1-09.14(12) Abandon Existing Sanitary Sewer Manhole
Section 7-05.4 is revised and supplemented as follows;
Measurement for abandon existing sanitary sewer manholes shall be per each for existing manholes
abandoned in conformance with the Contract Documents.
Section 7-05.5 is revised and supplemented as follows;
Payment for abandon existing sanitary sewer manholes shall cover the complete cost of providing all
labor, materials, and equipment required to complete the Work. The Work shall include but not be
limited to saw -cutting the existing surface as needed; removing and salvaging portions of the structure as
identified on the Drawings; fracturing the base to prevent standing water; plugging all pipe inlets;
furnishing and installing sand or other gravel material inside the manhole; compacted the sand to 90
percent density; hauling and disposing of waste materials; backfilling with native material: compacting
backfill; and placing, maintaining and removing temporary pavement patching in conformance with the
Contract Documents. Select imported trench backfill materials (except sand used to fill the manhole) are
included in other bid items.
1-09.14(13) Foundation Gravel
Replace the first sentence of the fifth paragraph of Section 7-10.4 with the following:
Removal and replacement of unsuitable foundation material shall be measured in tons based on the
placed weight of material installed. Placement of foundation gravel shall be measured only for the
area(s) authorized by the Engineer. Certified weight tickets shall accompany each load, a copy of tickets
shall be given to the Engineer daily. Wasted materials shall not be included in the measurement.
Replace the fifth paragraph of Section 7-10.5 with the following:
Payment for removal and replacement of unsuitable foundation material shall be made at the amount bid
per ton. Said payment shall be complete compensation for all labor, materials, equipment, excavation,
foundation gravel, haul, placement, water, compaction, removal and disposal of waste material, etc.
required to complete this item of work in conformance with the Contract Documents.
1-09.14(14) Select Imported Trench Backfill
Replace the sixth paragraph of Section 7-10.4 with the following:
Measurement for select imported trench backfill shall be measured in tons based on the weight of
material installed. Certified weight tickets shall accompany each load, a copy of tickets shall be given to
the Engineer daily. Wasted materials shall not be included in the measurement or payment. Only
materials placed within the pay limits shown shall be considered for payment. Material placed outside of
the pay limits shown on the plans or as approved by the Engineer shall be deducted from the certified
tickets.
Replace the sixth paragraph of Section 7-10.5 with the following
City of Renton Amendments — Schedule n Only 7
Payment for select imported trench backfill shall be made at the amount bid per ton. Said payment shall
be complete compensation for all labor, materials, equipment, hauling, placement, water, compaction,
removal and disposal of waste materials, etc. required to complete this item of work in conformance with
the Contract Documents.
1-09.14(15) Crushed Surfacing Top Course
Section 4-04.4 is revised and supplemented as follows;
Measurement for crushed surfacing top course shall be measured in tons based on the weight of material
installed. Certified weight tickets shall accompany each load, a copy of tickets shall be given to the
Engineer daily. Wasted materials shall not be included in the measurement or payment. Only materials
placed within the pay limits shown shall be considered for payment. Material placed outside of the pay
limits shown on the plans or as approved by the Engineer shall be deducted from the certified tickets.
Section 4-04.5 is revised and supplemented as follows;
The unit price Bid for crushed surfacing shall constitute full compensation for all Work, labor, materials,
and equipment required to furnish, deliver, place and compact the crushed surfacing in trenches at all
transverse crossings of streets or existing utilities and on disturbed roads and shoulders to the width and
depth indicated in these Specifications and where required by the governing road agency. The cost of all
motor patrol or grader Work, or any equipment required to shape the roadway to proper grade before the
crushed surfacing is placed shall also be included in this unit price Bid. The unit price Bid for crushed
surfacing shall also include removing and disposing of all material that is replaced by the imported
crushed surfacing.
1-09.14(16) Asphalt Concrete Patch Class B
Section 5-04.4 is revised and supplemented as follows;
Asphalt Concrete Patch Class B shall be measured by the ton in accordance with Section 1-09.1, with no
deduction being made for the weight of asphalt binder, blending sand, mineral filler, or any other
component of the mixture.
Section 5-04.5 is revised and supplemented as follows;
Payment for asphalt concrete patch shall be made at the amount bid per ton. Said payment shall be
complete compensation for all labor, materials, haul, surface preparation, compaction, water, pavement
saw cutting, asphaltic materials, tack oil, placement, final trench patch, utility adjustments, cleanup, etc.
required to complete this item of work in conformance with the contract documents. No additional
payment shall be made for work necessary to correct an asphalt concrete patch not installed in
accordance with specifications.
1-09.14(17) Remove/Replace Concrete Sidewalk & Driveways
Measurement for remove/replace concrete sidewalk and driveways shall be in square _yards of sidewalk
and driveway repair required for installation of the utilities as shown in the Contract Documents, unless
otherwise approved by the Engineer.
City of Renton Amendments - Schedule B Only 8
Payment for remove and replace concrete sidewalk and driveways shall be made at the amount bid per
square yard. Said payment shall be complete compensation for all labor, equipment, and materials
required to remove any existing materials; hauling all materials; and any and all preparation, forming,
placing, finishing, cleanup, etc. required to complete this item in conformance with the Contract
Documents.
1-09.14(18) Remove/Replace Concrete Curb & Gutter
Measurement for remove/replace concrete curb & gutter shall be in lineal feet of curb repair required for
installation of utilities as shown in the Contract Documents, unless otherwise approved by the Engineer.
Payment for remove/replace concrete curb and gutter shall be made at the amount bid per lineal foot.
Said payment shall be complete compensation for all labor, equipment, and materials required to remove
any existing materials; hauling all materials; and any preparation, forming, placing, finishing, cleanup,
etc. required to compete this item in conformance with the Contract Documents.
1-10 TEMPORARY TRAFFIC CONTROL
1-10.1(1) General
Section 1-10.l(1) is revised and supplemented as follows:
Two weeks prior to construction, the contractor shall erect informational signs alerting motorists to
expect delays during construction along NE Sunset Blvd and Duvall Avenue NE. The signs shall give
the date that construction will begin and an approximate ending date. "Businesses Open" signs shall be
erected in areas that will be affected by the construction. Provisions shall be made to maintain ingress
and egress to all businesses adjacent to the construction zone.
Two-way traffic shall be maintained in areas with more than one lane in each direction. Areas that have
only one lane in each direction shall maintain a "flagged" lane to allow traffic to pass through the
construction zone when possible. Detours will be allowed through areas where motorists cannot safely
pass through the construction zone.
Lane closures will .be necessary through portions of the project. "Water -filled", high -visibility,
temporary, traffic barriers will be required for lane separation if one direction of travel is diverted into a
lane or lanes that normally travel in the opposite direction. All traffic control devices shall meet the
requirements as set forth by the Manual of Uniform Traffic Control Devices.
In addition to the City of Renton's review and approval, Washington State Department of Transportation
review and approval will be required for traffic control through portions of the project.
1-10.4(1) Lump Sum Bid for Project (No Unit Items)
Section 1-10.4(1) is revised and supplemented as follows:
No separate measurement for traffic control work associated with Schedule B shall be made. Traffic
control shall be considered incidental to the pipe bid items for Schedule B.
1-10.5(1) Lump Sum Bid for Project (No Unit Items)
Section 1-10.5(1) is revised and supplemented as follows:
City of Renton Amendments — Schedule B Only 9
No separate payment for traffic control for traffic control work associated with Schedule B shall be
made. Traffic control shall be considered incidental to the pipe bid items for Schedule B.
5-04 ASPHALT CONCRETE PAVEMENT
5-04.3(5) Conditioning of Existing Surface
Section 5-04.3(5) is revised and supplemented as follows:
The Contractor shall maintain existing surface contours during patching, unless instructed otherwise by
City Engineer.
5-04.3(5)A Preparation of Existing Surface
Section 5-04.3(5)A is revised and supplemented as follows:
The Contractor shall provide its own mechanical sweeping equipment. The sweeper shall be on the
project prior to the start of paving, to insure the streets to be paved are clean before the tack coat is
applied. The sweeper shall keep the streets clean ahead of the paving machine and clean the streets
behind the empty trucks that have dumped their loads into the paving machine. The sweeper must sweep
all streets made dirty by the CONTRACTOR'S equipment. If the paving machine is "walked" from one
site to another, the sweeper must sweep up behind paving machine. The sweeper shall not leave the
overlay site until given permission by the City's inspector.
All utilities shall be painted with a biodegradable "soap" to prevent the tack and ACP from sticking to
the lids. Diesel shall not be used. After the application of soap, catch basins must be covered to prevent
tack and ACP from getting into catch basins.
The Contractor shall locate all utilities for access immediately after any paving and mark the location by
means of painting a circle around the location and scooping a portion of asphalt 4" - 6" in diameter and
the depth of the patch from the center of the utility location. The Contractor shall locate and completely
expose gas and water valves for access immediately after final rolling.
Utility adjustments shall begin no later than the day following the start of application of ACP. The
Contractor shall have a crew adjusting utilities every workable working day until all adjustments are
complete. Utility adjustments must be completed within 15 working days after patch is complete, and
within the specified contract time.
During the adjustment of any utility, existing concrete bricks or grouting material that has been broken or
cracked shall be removed and replaced at the CONTRACTOR's expense.
5-06 TEMPORARY RESTORATION IN PAVEMENT AREAS (Additional Section)
5-06.1 Description (Additional Section)
Pavement areas that have been removed by construction activities must be restored by the Contractor
prior to the end of each working period, prior to use by vehicular traffic. Within paved streets, the
Contractor may use temporary pavement to allow vehicular traffic to travel over the construction areas.
Temporary pavement shall be placed around trench plates or others devices used to cover construction
activities in a manner that provides a smooth and safe transition between surfaces.
City of Renton Amendineias — Schedule B Only 10
Within paved alleys; the Contractor may use the compacted backfill to allow vehicular traffic to travel
over the construction areas. Trench plates or others devices used to cover construction activities shall be
placed and anchored in a manner that provides a smooth and safe transition between and across surfaces.
5-06.2 Materials (Additional Section)
Materials for temporary restoration in pavement areas shall be `Hot Mix'.
The composition of other components of the temporary asphalt pavement shall be determined by the
Contractor to provide a product suitable for the intended application. The Contractor shall not use
materials that are a safety or health hazard.
Temporary pavement material that does not form a consolidated surface after compaction shall be
considered unsuitable and shall be removed from the site. Unsuitable temporary pavement shall be
disposed of offsite.
5-06.3 Construction Requirements (Additional Section)
The roadway subsurface shall be prepared for the temporary pavement as defined in Section 2-06.
Temporary pavement areas greater than ten (10) square feet shall be a minimum of four (4) inches thick
and roller compacted to consolidation. The completed pavement shall be free from ridges, ruts, bumps,
depressions, objectionable marks, or other irregularities.
The Contractor shall immediately repair, patch, or remove any temporary pavement that does not provide
a flat transition between existing pavement areas.
All temporary asphalt pavements shall be removed from the site by the end of the project and shall not be
used as permanent asphalt pavement or subgrade material.
7-05 MANHOLES, INLETS, AND CATCH BASINS
7-05.2 Materials
Section 7-05.2 is revised and supplemented as follows:
Manholes shall be precast concrete unless otherwise specified. Manholes shall be sized as indicated on
the Drawings with eccentric reducing cones conforming to WSDOT/AWWA Standard Plan B-23A
unless shown otherwise on the Drawings or herein. Poured in place bases shall not be allowed.
Maximum allowable dimension from top of cone to top of casting shall be 20 inches. A minimum of one
adjustment ring shall be installed between the top cone and the manhole cover.
Internal concrete channels, benches and fillets shall be formed using 4000LS (Low Shrinkage) 5 sack
mix with pea gravel to 5/8-inch (mac size) aggregate. A water reducing admixture shall be included in
the mix.
Pipe to manhole couplings shall be "Kor-n-Seal" boot, GPK Adaptor or approved equal.
Manhole sections shall have rubber gasket joints conforming to ASTM C 443. Flexible plastic gaskets
shall not be used. All pick holes and manhole sections shall be sealed from the inside and outside with a
sand and Portland cement concrete mortar to form a watertight seal. Quick set concrete grouts, such as
Jet Set Grout, are not allowed.
City of Renton Amendments - Schedule B Onh 1 1
Controlled density fill used to fill sanitary sewers being abandoned under this Contract shall be the
following mix or approved equal. The controlled density fill must have a strength of at least 100 PSI and
shall have flow characteristics appropriate for filling a sanitary sewer. The mix design for the controlled
density fill and the method of installation shall be approved by the Engineer prior to beginning operation.
Material Weight (lbs. per cubic yard) Yield, (cubic feet)
(Saturated, Surface Dry)
Ashgrove Type II 100 0.51
Fly Ash 400 2.85
CDF Sand 2,419 14.80
Water 225 (27.0 Gal -US) 3.61
Total Air (20.0%) 5.44
Total = 27.21
Water/Cement Ratio, 0.45 Lbs/Lb
Slump, 10.00 inches
Concrete unit Weight, 115.6 PCF
Add one Darafill Egg Capsule per Cubic Yard
7-05.3 Construction Requirements
Section 7-05.3 is revised and supplemented as follows:
Manhole base sections shall be placed on a graded and firmly compacted granular bedding course
conforming to the requirements for sewer bedding in Sections 7-08.2 and 7-08.3(1)C of the Standard
Specifications. The bedding shall be at least 6-inches thick and extend at least 12-inches beyond the
limits of the base section all around. The bedding shall be graded to ensure uniform contact and support
of the manhole in a true vertical position.
Manhole channels shall conform to the City's standard details and the construction plans. All manholes
shall be installed with locking frame and cover as shown on City of Renton detail BR29.
Contractor shall re -channel existing manhole as necessary to smoothly direct the flow into the existing
system. Any leaks in the entry couplings or other areas created while connecting to the existing manhole
shall be sealed with Strata Tech ST-520 injection resin or approved equal.
All pick holes and joints shall be sealed inside and outside with a sand and Portland cement concrete
mortar to provide a waterproof seal. All manholes shall be watertight.
Excavation for manholes, clean -outs, inlets, and catch basins shall be provided with adequate safety
systems meeting the requirements of the Washington State Industrial Safety and Health Act (WISHA),
Chapter 49.17 RCW, and all regulations adopted pursuant thereto. Contractor shall have a structural
engineer prepare and stamp any and all shoring plans and calculations. The Contractor alone shall be
responsible for worker safety and the Owner and Engineer assume no responsibility.
7-05.3(2)A Abandon Existing Sanitary Sewer Pipes (Additional Section)
Section 7-05.3(2)A is added as follows. -
City of Renton Amendments — Schedule 13 Only 12
Where it is required that an existing sanitary sewer pipe be abandoned, the pipe shall be filled with a
controlled density fill and both ends of the pipe as well as all lateral connections to the pipe shall be
plugged with 3000 PSI cement concrete.
7-05.3(5) Manhole Coatings (Additional Section)
Section 7-05.3(5) is added as follows:
All new sanitary sewer manholes shall be coated as specified below.
Interior Coatin
Coating Material:
High Solids Urethane
Surfaces:
Concrete
Surface Preparation:
In accordance with SSPC SP-7 (Sweep or brush off blast)
Application:
Shop/Field
System Thickness:
6.0 mils dry film
Prime Coating:
One coat of Wasser MC-Aroshield high solids urethane (2.0 DFT)
Finish Coating:
Two or more coats of Wasser MC-Aroshield (min. 4.0 DFT)
Color:
White
The drying time between coats shall not exceed 24 hours in any case
7-08 GENERAL PIPE INSTALLATION REQUIREMENTS
7-08.2 Materials
Section 7-08.2 is revised and supplemented as follows:
Bedding material for PVC pipe shall meet the requirements of Section 9-03.16.
7-08.3(1)A Pipe Zone Bedding
Section 7-08.3(1)A is revised and supplemented as follows:
Trench excavation shall be unclassified. The CONTRACTOR shall excavate all materials encountered
to the depth shown on the Drawings or as directed by the ENGINEER. No extra payment shall be
allowed for bedrock, boulders, hard pan, cemented gravel, or any other material encountered.
All ledge rock, boulders, and stones shall be removed to provide a minimum of four inches clearance
under all portions of the pipe. All rock larger than two inches in diameter shall be disposed of at a site
obtained by the CONTRACTOR, and shall not be used for trench backfill.
7-08.3(1)C Pipe Zone Bedding
Section 7-08.3(1)C is revised and supplemented as follows:
Hand compaction of the bedding materials under the pipe haunches will be required. Hand compaction
shall be accomplished by using a suitable tamping tool to firmly tamp bedding material under the
haunches of the pipe. Care shall be taken to avoid displacement of the pipe during the compaction effort.
Compaction shall provide adequate support along the pipe to prevent settling of the pipe.
City of Renton Amendments — Schedule 13 Only 13
If the native material at the trench bottom meets the gradation as specified for bedding material, the
bottom shall be hand finished to grade so that the pipe will have uniform support along the barrel and
bell. When native material at the trench bottom is stony or otherwise non -uniform, the trench shall be
over -excavated a minimum of 6 inches below the specified grade and a layer of pipe bedding material
shall be placed to the specified grade. If the native material at the trench bottom is unsuitable for
foundation purposes or will have difficulty providing uniform bearing for the pipe, such material shall be
removed and replaced with a minimum of 6 inches of compacted foundation material.
7-08.3(1)D Pipe Foundation (Additional Section)
Section 7-08.3(1)D is added as follows:
When soft or unstable material is encountered at the subgrade which, in the opinion of the Engineer, will
not uniformly support the pipe, such material shall be excavated to an additional depth as required by the
Engineer and backfilled with foundation gravel material placed in maximum 12-inch lifts. Foundation
gravel shall be ballast and conform to the requirements of Section 9-03.9(1) of the Standard
Specifications.
Excess excavation below the required grade shall be backfilled with foundation gravel as specified above
and thoroughly compacted to the required grade line.
7-08.3(1)E Trench Dewatering (Additional Section)
Section 7-08.3(1)E is added as follows:
All pipe and fittings shall be laid "in the dry" unless otherwise approved by Engineer. Dewatering may
be required during construction of the sewer lines. Dewatering shall be considered incidental to bid
items for installation of the utilities. If necessary, dewatering may consist of a combination of trench
pumping, well points, and/or wells, and must satisfy the following requirements:
• Prevent water from entering the trench and maintain dry trench conditions at the
foundation level.
• Prevent caving of the trench walls related to water migration through the walls.
• Minimize turbidity in the effluent by utilizing properly sized filter pack materials on
sumps, wells, and well points.
• Preserve strength of foundation soils.
• Recovery of water levels may be rapid if pumping is interrupted. The Contractor shall
provide standby equipment installed and ready to operate to ensure continuous pumping.
• When wells and/or well points are no longer required, they shall be removed, backfilled,
and abandoned. Wells can be left in place except the top three feet must be removed
provided they are abandoned in accordance with Chapter 173-160 WAC.
• Turbid water must be treated if discharged to the storm system. Discharge of dewatering
effluent to the storm system must comply with DOE dewatering permit conditions. The
Contractor is required to obtain this permit prior to discharging dewatering effluent to
the storm sewer system. All costs necessary to treat and monitor the dewatering effluent
in accordance with the permit shall be the Contractor's responsibility.
• The dewatering program must be completed in such a way as to avoid excessive
dewatering related settlement of adjacent facilities.
City of Renton Amendments - Schedule 13 Only 14
7-08.3(1)F Hazardous Waste Training (Additional Section)
Section 7-08.3(1)F is added as follows:
Construction crews working with excavated soils shall have at least 40 hour of training in safety
requirements for working with hazardous materials should they be encountered.
7-08.3(2)A Survey Line and Grade
Section 7-08.3(2)A is revised and supplemented as follows:
The Contractor shall be responsible for securing the services of a professional land surveyor or qualified
engineer who shall provide all survey staking needed in conjunction with the project.
The Contractor shall assume full responsibility for the accuracy of the staking and shall provide all
replacement staking or re -staking needed. The Contractor shall paint the project stationing baselines on
the ground at 50 foot intervals.
The Contractor shall have his surveyor locate each major item of work done under this contract by
centerline station, offset, and elevation. In addition, the Contractor shall have his surveyor locate, by
centerline station, offset, and elevation, all existing utilities uncovered or crossed during Work covered
under this contract.
The Contractor's surveyor shall maintain accurate field notes that record as a minimum centerline
station, offset and cut to each manhole, side sewer, utility crossing, as well as all other changes in
alignment or grade as may be needed to draw accurate as -constructed records of the project. These notes
shall be kept legibly, in a format conforming to good engineering practice in a hard covered field book.
Major items of work shall be defined to include the following items:
• Manholes, Catch Basins and Cleanouts
• Side Sewer Tees and locations at edge of right of way
• Casing end points
• Major changes in design grade(s)
• Existing utility crossings
After completion of the work covered by this contract, the Contractor shall provide a copy of all survey
field notes containing the construction staking and as -built notes to the Engineer in a hard cover binder
along with one set of white prints of the construction drawings upon which the Contractor has plotted the
locations of existing utilities, and one set of white prints of the construction drawings upon which the
Contractor has plotted the as -built location of the new work as recorded in the field book(s). These
drawings shall bear the surveyor's seal and signature certifying its accuracy.
7-08.3(2)B Pipe Laying - General
Section 7-08.3(2)B is revised and supplemented as follows:
Isolated grade deviations limited to less than 18 feet in length (each) due to pipe bellies or pipe settling
shall not exceed one-half inch.
City of Renton Amendments - Schedule 13 Only 15
7-08.3(2)J Storing Pipe (Additional Section)
Pipe shall be stored on clean, level ground to prevent undue scratching or gouging of the pipe. If the pipe
must be stacked for storage, such stacking shall be done in accordance with the pipe Manufacturer's
recommendations. The handling of the pipe shall be done in such a manner that it is not damaged by
dragging over sharp objects or cut by chokers or lifting equipment. The interior of all pipe and fittings
shall be kept free of debris and lifting equipment at all times.
7-08.3(3) Backfilling
Section 7-08.3 is revised and supplemented as follows:
Select imported trench backfill conforming to Section 9-03.12(1)C shall be placed between the pipe
bedding and the base of the subgrade where the native material is not suitable for backfill as determined
by the Engineer. The remaining depth shall be restored as noted on the plans.
To the maximum extent available, suitable material obtained from trench excavation shall be used for
trench backfill. All material placed as trench backfill shall be free from rocks or stones larger than 2
inches in their greatest dimension, brush, stumps, logs, roots, debris and organic or other deleterious
materials. No stones or rock shall be placed in the upper three feet of trench backfill. Rock or stones
within the allowable size limit incorporated in the remainder of fills shall be distributed so that they do
not congregate or interfere with proper compaction. Contractor shall be responsible for the disposal of
any excess excavated soil material.
Contractor shall protect suitable native excavated material from becoming unsatisfactory as a result of
moisture or separation. Suitable native backfill shall meet the requirements of Section 9-03.16 or 9-
03.19.
Backfill within paved areas shall be compacted to at least 95 percent of maximum dry density as
determined by the modified proctor compaction test, ASTM D1557. This includes the foundation,
backfill, and base course materials. Maximum lift thickness of backfill shall not exceed 24 inches
between the top of the bedding and 4 feet below grade and 12 inches from 4 feet below grade to the base
of the subgrade. The Engineer may be on -site to collect soil samples and to test compaction. The
Contractor shall provide site access at all times for compaction testing and sample collection. Areas of
the trench which fail to meet the compaction requirements shall have the backfill removed, replaced and
re -compacted at the Contractor's expense.
The Contractor shall be responsible for any settlement of backfill, sub -base, and pavement which may
occur during the period stipulated in the contract conditions. All repairs necessary due to settlement shall
be made by the Contractor at his expense.
Backfill in unimproved areas shall be compacted to at least 90 percent of maximum dry density as
determined by the modified proctor compaction test, ASTM D1557.
7-17 SANITARY SEWERS
7-17.2 Materials
Replace the first paragraph with first table, and the fourth paragraph with second table of Section 7-17.2
with the following:
City of Renton Amendments — schedule B Only 16
Gravity sewer pipe shall PVC Sewer Pipe conforming to Section 9-05.12(l) unless indicated otherwise
on the plans. PVC pipe shall be considered flexible conduit. The Contractor shall provide two copies of
the pipe manufacturer's technical literature and tables of dimensional tolerances to the Engineer. Any
pipe found to have dimensional tolerances in excess of those prescribed or having defects that prevent
adequate joint seal or any other damage shall be rejected. If requested by the Engineer, not less than
three or more than five lengths of pipe for each size, selected from stock by the Engineer, shall be tested
as specified for maximum dimensional tolerance of the respective pipe.
All fittings shall be of the same type and class as the pipe unless specifically called out for herein or on
the Drawings. PVC sewer pipe and fittings shall be fumished with bells and spigots which are integral
with the pipe wall. PVC pipe joints shall be rubber gasket type. Solvent cement joints shall not be used.
7-17.3(2)F Air Pressure Test for Sanitary Sewers Constructed of Non Air -Permeable Materials
Section 7-17.3(2)F is revised and supplemented as follows:
Side sewers stubbed to the property line shall be air -tested in conjunction with the main sewer pipe.
7-17.3(2)H Television Inspection
Section 7-17.3(2)F is revised and supplemented as follows:
The video inspection shall be done after the manholes have been channeled and the line cleaned and
flushed. The video inspection shall be done with a minimum flow of water in the pipe and inspected in
the direction of the flow unless otherwise directed by the ENGINEER. The camera shall have rotational
capabilities and be used by the operator to view up each side sewer connection and provide best views of
any non -conforming items.
Once the television inspection has been completed the contractor shall submit the written reports of the
inspection plus the video tapes to the Engineer. Said video tapes are to be in color and compatible with
the City's viewing and recording systems. The City system accepts %-inch wide high density VHS tapes.
The tapes shall be run at standard speed SP (1 5/16 I.P.S.). The Contractor shall use TV inspection
report forms that are considered industry standard and as approved by the Owner, and provide completed
forms and video tapes of the completed TV inspection to the Owner.
8-13 1NIONUMENT CASES
8-13.1 Description
Section 8=13.1 is revised and supplemented as follows:
The Contractor shall retain the services of a registered surveyor for re-establishing monuments impacted
by construction.
8-13.3 Construction Requirements
Replace the last paragraph of Section 8-13.3 with the following:
The monument shall be furnished and set by the Contractor's surveyor.
City of Renton Amendments — Schedule B Only 17
9-03 AGGREGATES
9-03.12(1)C Select Imported Trench Backfill (Additional Section)
Aggregate for select imported trench backfill shall consist of granular material, either naturally occurring
or processed, and shall meet the following requirements for grading and quality.
Sieve Size
Percent Passing
1-1/4" square
100
'/4" square
25 min.
U.S. No. 40
40 max.
U.S. No. 200
7.0 max.
Sand Equivalent
50 min.
City of Renton Amendments — Schedule 13 Only Is
MORTAR FILLET
MANHOLE FRAME AND COVER
SEE DRAWING BR29
(SP PAGE BO74)
ADJUSTMENT (4" MIN.)
CONE
RUBBER GASKETED JOINTS IN
ACCORDANCE WITH ASTM C-443
STEPS - 3/4" DEFORMED BAR
STEPS SHALL BE INCLUDED
CONCRETE RISER BY PIPE INC.,
OR APPROVED EQUAL.
MAX. PIPE SIZE - 'E'
LADDER -STD. ALUMINUM
OR GALVANIZED STEEL
CONCRETE SHELF
PRECAST BASE SECTION
OR CAST IN SHELF.
SANITARY MANHOLE TYPICAL DETAIL
NOT TO SCALE
`A'
'B'
'C'
'D'
'E'
48" MH
48"
6" MIN.
5"MIN
24" MIN.
21" I.D.
54" MH
54"
8" MIN.
5.5" MIN,
24" MIN.
24" I.D.
60" MH
60"
8" MIN.
6" MIN.
42" MIN.
30" I.D.
NOTES
1. STEPS TO BE 3/4" 0 DEFORMED BAR GALVANIZED SAFETY STEPS OR EQUAL.
2. STEPS ARE TO BE IN PLACE BEFORE MANHOLE SECTIONS ARE INSTALLED.
3. CASTING TO BE PER DRAWING BR29.
4. MANHOLE SECTIONS TO BE OF REINFORCED PRECAST CONCRETE.
5. ALL JOINTS SHALL BE GROUTED.
6. SANITARY SEWER MANHOLES SHALL HAVE ALL INTERIOR SURFACES, INCLUDING CHANNELING,
COATED (SEALED) WITH A HIGH SOLIDS URETHANE COATING; WASSER MC—AROSHIELD OR
APPROVED EQUAL; COLOR OF COATING SHALL BE WHITE.
7. RUBBER GASKETED JOINTS SHALL BE IN CONFORMANCE WITH ASTM C-443.
8. CHANNEL HEIGHT SHALL BE A MINIMUM OF 3/4 THE INSIDE DIAMETER OF THE LARGEST PIPE.
9. CONNECTIONS TO MANHOLE SHALL BE MADE USING GPK ADAPTOR, KOR—N—SEAL BOOTS OR
APPROVED EQUAL.
10. MANHOLES EQUAL TO AND GREATER THAN 20 FEET DEEP SHALL HAVE A "SURETRACK" CLIMBING
AND FALL PROTECTION SYSTEM INSTALLED.
104/10/OA
Revised notes.
IJOH
I DMC
0/17/961
Added notes.
IDcy
I AG
DATE
I REVISION
I BY
IAPPR'D
SANITARY MANHOLE
TYPICAL DETAIL
ADOPTED
CITY OF RENTON
STANDARD PLANS
LST DATE: 04/03
DWG. NAME: BR28 SP PAGE: BO7
J= 6'
( 234' —1
334'
NOTES:
1. ALL COVERS SHALL BE LOCKING LID PER INLAND FOUNDRY CO. INC.
No. 817 (LOCKING) OR EQUAL.
2. USE FRAME AND COVER FOR STORM (SPECIFY "DRAIN" ON COVER),
SANITARY (SPECIFY "SEWER"), OR WATER (SPECIFY "WATER").
04/10/03
1Revised notes and Detail.
JDH
I DMC
110/17/961
Added notes.
DCV
I AG
DATE
I REVISION
I BY
APPR'D
m
-I-II-I-I
I-I--I-I-�
-1'1�11�1�1-
Le,
'121' f�
SPECIFY
LETTERING
MANHOLE
FRAME AND COVER
**wc
ADOPTED
C[TY OF RENTON
STANDARD PLANS
LSP DATE: 4/2003
DWG. NAME: BR29 SP PAGE: B074
SEAL WITH AR 4000 AND
DRY SAND AFTER PATCHING
U
NOTES:
PATCHED AREA
IN I J
SECTION A- A
REMOVE PAVEMENT AND BASE MATERIALS FOR A DISTANCE
WHICH IS EOUAL TO THE DIAMETER OF THE FRAME PLUS TWO FEET.
ADJUST CASTING FRAME TO PAVEMENT SURFACE USING CONCRETE
BLOCKS.
REPLACE ALL BUT TOP 2" OF EXCAVATED MATERIAL WITH
CLASS 3000 CONCRETE (3/4). FINISH PAVEMENT SURFACE
WITH 2" OF A.C. CLASS " G".
SEE CITY OF RENTON SUPPLEMENTAL
SPECIFICATIONS SECTION 7-05.3(1).
4/10/03
Revised notes and Detail.
lJDH
I DMC
10/17/96
Added notes.
jDCVI
AG
DATE
REVISION
I BY
APPR'D
m
.C. CLASS "G"
CONCRETE
TYPICAL UTILITY COVER
ADJUSTMENT FOR
PAVEMENT OR OVERLAY
ICY p ADOPTED
O CITY OF RENTON
f � f
STANDARD PLANS
�NV LST DATE: 04/2003
DWG. NAME: BR36 SP PAGE: B001
yx�I� 16 Bars at 7" centers
bottom face
with I" MIN cover
C I ear on ce
TYP x I�� 1�
v� {�
NOTES
I. Proprietary manhole steps and alternate oIcstic
ladders are occeptoble, provided that trey con.ur,n
to Section R, ASTM C 476 (AASHTO M 199) o,�d mee+
all WISHA requirements.
2. Manhole step legs shall be parallel or approximately
rod; al of the option of the manufacturer, eycept
that all steps in any manhole shall be similor,
Penetration of outer wall is prohibited,
12" MIN
18 Galvanized deformed rebor
96 TOP SLAB W��HI2 MIN•5 Bars at 6" Qcenters bottom face
2" with 1" MIN cover
Clearance MANHOLE STEP DROP RUNG
TYP MANHOLE STEP
48'
— m 113/4" Center to center
72" TOP SLAB
14 Bars at 6'
Centers bottom face
with 1" MIN Cover
Clearance
TYP
46 , 54" AND 60" TOP SLAB
15,1 24,. 15"!
—{r
I" Clearance °4 Dar
GRADE RING
3
I_ Sig , , R
:7�-17 Galvanized
Smooth steel
x
a
s
6"
•8 Galvanized U/ u
deformed rebor —
PREFABRICATED LADDER
MISCELLANEOUS
MANHOLE DETAILS
)•le•�4 Revised notes. _ _ ADN _
5 .7?! 1,%ld,.,60" 1e0 MOP dlTensln�nntl rcplpnitl, SJO � _--
p,�r� .r,(vIa ON er �rPwD
ADOPTED
CITY OF RENTON
• .
Standard Plans
I st Datc3/18/94
a; B -24
SP PAGE B034
6" MIN
PROPERTY LINE
3,_0„ MIN, .,
6,_0"
FUTURE
6" BUILDING SEWER PIPE
BUILDING SEWER
;2; T w
2"x 4" STUD SERVICE MARKER PAINT UPPER
TEE WITH 6" SIDE OUTLET
-'
PORTION WHITE ANS STENCIL ON SIDE
D#6GWIRE'SEWWRAPPIED TH HIGH
ASTUDCK EANDRS.
AND AROUND THE
6" SIDE SEWER AND BUILDING SEWER w
EXTENDED TO THE TOP OF THE STUD.
0
°-
UNLESS OTHERWISE
APPROVED BY THE CITY, MAKE TAP THROUGH CAST
IRON SADDLE SECURED TO SEWER MAIN WITH STAINLESS STEEL BANDS
WHEN CONNECTING
NEW SIDE SEWERS TO EXISTING MAIN,
60" ALLOWABLE MAX,
VITRIFIED CLAY, PLAIN AND REINFORCED CONCRETE, DI PIPE AND CI
FOR CAST IRON PIPE
PIPE SEWER MAINS
ARE TO BE CORE DRILLED
OR DUCTILE IRON PIPE,
/
/ oU�
11315 mix
CONCRETE
BLOCKING
--
_
— — — — — —
—
MIN SLOPE
HORI20NTAL
6" SIDE OUTLET TEE
ZC��
SEWER MAIN .
EWER MAIN
CONCRETE BLOCKING ANGLE
OF TEE AT MAIN OVER 25 TYPICAL SIDE SEWER ELEVATION
ELEVATION
NOTE,
UNLESS OTHERWISE SHOWN ON PLAN, SIDE SEWER SHALL HAVE A MINIMUM 5' COVER AT PROPERTY
LINE OR 3-5' LOWER THAN THE LOWEST HOUSE ELEVATION, WHICHEVER IS LOWER,
DATE I REVISION 19Y1APPR'QI
STANDARD SIDE SEWER INSTALLATION
(SEWER MAIN TO PROPERTY LINE)
%t ADOPTED
CITY Or RENTON
♦ i
Standard plane
1ST DATE:12/1S/91
DWC, NAME: BR39 SP PACE: 8078
LENGTH FT
w 0
a 50
100
Li 150
200
< 250
0
300
Z 350
400
450
LENGTH FT
w 0
a 50
a
100
150
200
0
250
Z 300
550
000
450
6 IN. DIAMETER PIPE
0
50
100
150
200
250
300
350
4001
450
1 500
0
20
40
59
79
1 99
119
139
158
170
170
35
55
75
95
114
134
154
174
178
177
177
70
90
110
130
150
169
187
186
184
183
182
106
125
145
165
185
195
193
191
189
187
186
141
161
180
200
202
199
197
195
193
191
190
176
196
214
209
205
202
200
198
196
194
193
211N22
208
205
202
200
198
197
195
227
210
207
205
202
201
199
197
227
E2-
211.
209
206
204
202
201
199
227
213 1
210
208
206
204
202
201
TIME SECONDS
6 IN. DIAMETER PIPE
0
50
100
150
200
250
300
350
4001
450
1 500
0
20
40
59
79
99
119
139
158
170
1 170
55
75
95
114
134
154
174
192
190
188
186
110
130
150
169
189
209
210
207
203
201
198
165
185
205
224
233
227
222
217
214
210
208
220
240
257
248
241
1 235
230
225
222
218
215
275
271
261
253
247 1
241
236
232
1 228
225
222
283
273
264
257
251
246
241
237
233
230
227
283
274
267
260
254
249
245
41
237
234
231
283
275
269
263
257
252
248
J44
241
238
235
283
276
270
264
259
255
2517
244
241
238
TIME SECONDS
PROCEDURE:.
SLOWLY PRESSURIZE THE PIPE TO 4.0 P.S.I.G.
ALLOW 2 MINUTES FOR STABILIZATION, ADDING AIR
AS REQUIRED. TIME THE DROP FROM 3.5 P.S.I.G.
TO 2.5 P,S.I.G. READ THE MAXIMUM ALLOWABLE
TIME IN SECONDS FROM THE TABLES.
LENGTH FT
w 0
a
IL 50
w 100
w 150
< 200
23250
Z 300
350
400
a50
LENGTH FT
a 0
n 50
w 100
w 150
200
0 250
z 300
350
400
450
6 IN. DIAMETER PIPE
0
50
100
150
200
250
300
350
400
450
500
0
20
40
59
79
99
119
139
158
170
170
79
99
119
139
158
178
198
208
204
201
198
158
178
198
218
238
246
238
232
227
222
219
238
257
277
283
272
263
255
248
243
238
234
317
321
306
294
283
275
267
261
255
250
246
340
325
1 312
301
291
283
276
270
264
259
255
340
327
316
306
298
290
283
277
272
267
263
340
329
319
310
302
295
289
283
278
274
269
340
330
321
313
306
300
294
288
283
279
275
340
331
323
316
309
303
298
292
288
283
279
TIME SECONDS
6 IN. DIAMETER PIPE
0
50
t00
150
200
250
300
350
400
450
500'
0
20
1 40
59
79
99
119
139
158
170
170
124
144
163
183
203
223
243
237
231
225
221
247
267
287
307
312
298
286
276
268
261
255
371
391
371
352
336
323
312
302
293
286
279
425
402
383
366
352
340
329
320
312
304
298
425
406
390
376
363
352
342
333
326
318
312
425
409
395
383
371
361
352
344
336
329
323
425
411J04
99
388
378
368
360
352
345
338
332
425
41302
392
383
374
366
359
352
346
340
425
414
395
387
379
371
365
358
352
347
TIME SECONDS
AIR TEST TABLE (LOW PRESSURE)
FOR SEWER MAINS
G���
~ ADOPTED
11 CITY .OF RENTON
♦ 7&V4
STANDARD PLANS
�LST DATE: 12/96
DWG. NAME: BR07 SP PAGE: 8083
Roth Hill Engineering Partners, LLC
RothHil
16 1 121
CITY OF REiv i ON
UTILITY SYST -,�J
LETTER OF TRANSMITTAL
To: John Hobson
Municipal Building - 5th Floor
1055 South Grady Way
Renton, WA 98055
Please find: ❑ Herewith
via:
2600 116"' Avenue NE, Suite 100
Bellevue, Washington 98004
Tel. 425.869.9448
800.835.0292
Fax 425.869.1190
Date: August 8, 2005
Client: City of Renton
Contract No:
Project No: 0015.0001 1.001
Subject: Sunset Interceptor, Phase 3
COPIES
DATE
NO.
DESCRIPTION
1
Contract Specifications by Ber er/Abam
1
Contract Specifications/Inserts by RHEP
THESE ARE TRANSMITTED as checked below:
❑ As requested ❑ For your file ❑ Approved as noted
❑ For review and comment ❑ For your information ❑ Returned for corrections
❑ For approval ❑ Approved as submitted ❑ Resubmit copies
El
REMARKS: I am returning the spec book that Dave provided me with some redlines as well as the
specifications from RHEP for the sanitary sewer work. I have laid out RHEP's specs as inserts to the
contract, with the majority of the specs being incorporated as a separate section. If that doesn't work or if
you have any questions, please call me.
COPIES: File
F. \0015\00011 \DesigniCorresp\Owner\JH_080805_TF_transmtl_Speafications.doc
SIGNED:
Tony Fisher, P.E.
Roth Hill Engineering Partners, LLC
RothHill
LETTER OF TRANSMITTAL
To: Dave Christensen
City of Renton
Planning/Building/Public Works
1055 South Grady Way
Renton, WA 98055
Please find: ❑ Herewith
via: Hand Deliver
2600 116t" Avenue NE, Suite 100
Bellevue, Washington 98004
Tel. 425.869.9448
800.835.0292
Fax 425.869.1190
Date: July 20, 2005
Client: City of Renton
Contract No:
Project No: 0015.00003.001
Subject: Sunset Interceptor, Ph. 3
COPIES
DATE
NO.
DESCRIPTION
1
7/20/05
Review Comments on Preliminary Drawings
THESE ARE TRANSMITTED as checked below:
❑ As requested
❑ For review and comment
❑ For approval
REMARKS:
❑ For your file ❑ Approved as noted
❑ For your information ❑ Returned for corrections
❑ Approved as submitted ❑ Resubmit copies
I have attached my review comments on the Sunset Interceptor, Phase 3 Project. My review focused on
trying to find and resolve conflicts between the storm sewer improvements and the sanitary sewer
improvements. I was able to address the majority of those conflicts by lowering the sanitary sewer main
slightly, but the storm sewer will need to be raised about a foot as marked on Sheet UT2 in order to avoid
a conflict with the sewer main and a side sewer.
I also looked at the contract specifications and noted that they did not include any edits for the sewer
portion of the project. I am not sure we ever sent those edits to Berger/Abam. After looking at the format,
I want to spend some time massaging our specifications to mesh with the other specifications. I will send
those modifications to you next week.
Please let me know if you have any questions.
COPIES: File SIGNED: v'�--_- --
F.\0015`,000111Design,Corresp�OwnerlDC_072005_TF_Transmtl_DesignDwgs.doc Tony Fisher, P.E.
CITYOFRENTON
RECEIVED
JUL 2 0 2005
BUILDINGDIVISION
A PORTION OF SW 1/4, SEC. 3, T. 23 N., R. 5E., W.M.
co EN S - 71=0105
CITY OF RENTON
NE SUNSET BOULEVARD (SR 900)/
DUVALL AVENUE NE INTERSECTION
IMPROVEMENT PROJECT
FED. AID NO. STPH-0900(21)
' ���i� VICINITY MAP
z fi
CALL 4$ HOURS 33301 9THAVENUE SOUTH
s�O2tL FEDERAL WAY, WASHINGTON
�s BEFORE YOU DIG BERGERIAHAA4 98003-26M
1-800-424-5555 c. VOICE[ (206)431-2300
(cis tiwc s, zaab FAX: (206)431-2250 No.
REVISION
AREA MAP
PROJECT AREA
DRAWING INDEX
Dig
2No
sneer
IVo
Drawrng Td1e S
11
1
Index and Vicinity Map
Al
2
Alignment Plan
Lt
3
Legend, Abbrewations and General Notes
R1
4
Typical Roadway Section - Sheet 1 of 2
R2
5
Typical Roadvay Section - Sheet 2 of 2
UQ1
6
Drainage Quantities
UTt
7
Drainage & Utility Plan - Sheet 1 of 4
t1T2
8
Drainage & Utility Plan - Sheet 2 of 4
Ufa
9
Drainage & Utility Plan - Sheet 3 of 4
UT4
10
Drainage & Utility Plan - Sheet 4 of 4
UT5
11
Drainage Laterals
UT6
12
Drainage Details
PV1
13
PWng Plan - Sheet I of 2
PV2
14
Paving Plan - Sheet 2 of 2
DI
15
Typical Details
CHI
16
Channelization Plan - Sheet 1 of 3
CH2
17
Channelization Plan - Sheet 2 of 3
CH3
18
Channelization Plan - Sheet 3 of 3
QT1
19
Quantity Tabdation - Channelization
TS1
20
Traffic Signal Plan
TS2
21
Traffic Signal Standard Plan
TS3
22
Traffic Signal Wire Terminations
SG1
1 23
Signing Plan - Sheet 1 of 3
SG2
1 24
iSiong Plan - Sheet 2 of 3
SG3
1 25
ISigning Plan - Sheet 3 of 3
- AS SHOWN- t► CITY OF
--- '::8R RENTON
DATUM
--�-- Plonning/Building/Public Works Dept.
By DATr_ APPR
NE SUNSET BOULEVARD (SR 900); 5/4/0:
DUVALL AVE NE INTERSECTION
INDEX AND VICINITY MAP ol;
I
0
169+00
i
A PORTION OF SW 1/4, SEC. 3, T. 23 N.,
i
. 7
T
u- t--_-- 7
T T -
• --^-
Viz. 12' IN N-•----•-
.� - -�.
3
3
I170+00
A -LINE
❑4
-
_111+00
—
CALL 48 HOURS
er BEFORE YOU DIG
1-800-424-5555
nrwa March u. zaac
33301 9TH AVENUE SOUTH
FEDERAL WAY, WASHINGTON
BERC"/ARAM 9eoo3-26M
VOICE: (206)431-2300
FAX: (206)431-2250 �.
T�!-
172+00
R. 5E-.1 W.M.
cf�
— ; --- T
3
!^a
Z 173+00
`tTs
iw
SAS SHOWN
REVISION BY DATE I APPR �� 61"®"'a•
CITY OF
-� RENTON
PI—oN/Buitdng/Public Works Dept.
NE SUNSET BOULEVARD (SR 900)/ 5/+/0+
DUVALL AVE NE INTERSECTION
DRAINAGE & UTILITY PLAN UT j
SHEET 1 OF 4 7 �•2,
(V
9
A PORTION OF SW 1/4, SEC. 3, T. 23 N.,
h�
IS\ / S
SS _
T P
N�'OTE LEGEND:
t0S'/( DENOTES PROPOSED STRUCTURE,
L- T 12 . 01„_----- W j S SEE THIS PLAN OR LATERAL
�I S.R. 900/SUNSET BLVD,
~ 174+011
I a
qti
_
a
I h oleo
430
....
....
.........
.........
.........
.........
....
....
....
.........
... ... .
....
llT2
A
420
....
....
....
....
.........
.........
.........
.........
.........
.........
.........
.........
....
....
....
....
410
....
....
....
.........
.........
.........
.........
.........
.........
....
....
....
....
....
....
.........
.........
.........
.........
....
....
....
....
....
.........
.........
.........
O.50%...
.........
.........
.........
.........
....
....
....
400
:...
390
V200
LF:::::::
:::: 1:2"
SCHEDULE
::::SEE
SHEET:
380
....
....... .
.........
.
174+00
—r I ot PROFILE SHEETS.
A —LINE '. O DENOTES EXISTING STRUCTURE TO
�.1z� BE MODIFIED, SEE STRUCTURE
175+00 � NOTES.
0 ` O BEOTES EXISTING STRUCTURE TO
REMOVED, SEE STRUCTURE
I LLJJ �=3U NOTES.
O�
175+00
33301 9TH AVENUE SOUTH
�=12 CALL 48 HOURS ; FEDERAL WAY, WASHINGTON
BEFORE YOU DIG 8ERGER/AR4M 98003-2600
1-800-424-5555 E■. 1 II E E E E 1■ a VOICE: (206)431-2300
uvua5 MA"ts, mee 7 ='TM' FAX: (208F131-2250 NO.
I ❑3 ADJUST WATER VALVE
BOX/MANHOLE TO GRADE.
�i HYDRANT MARKER, INSTALLED BY
RENTON FIRE DEPARTMENT.
T ECONSTRUCT FOUNDATION AND
RELOCATE STREET LIGHT AND
JUNCTION BOX PER CITY OF
RENTON STANDARD PLANS JR-06
& JR-35.
ADJUST MONUMENT CASE AND
COVER TO GRADE PER WSDOT
STANDARD PLAN H-7.
4`s a v.I� rMl
AA�,.,�,.le
DRAINAGE & UTILITY PLAN
SCALE: 1 "=20'-0"
R.5E., W.M.Ci n_
U
178+DO
s S.R 900��NSET g p /�
6 -�_ -i
1 -i
—ram_
176+00 177+00 178+00 179+00
10 0 10 20 20 0
1"=10, 1 "=20'
VERT Scale feet HORIZ scale
AS SHOWN '"®10"O ""' 8 CITY OF NE SUNSET BOULEVARD (SR 900)/
r° RENTON DUVALL AVE NE INTERSECTION
DATUM Planning/Building/Public Works Dept. DRAINAGE & UTILITY PLAN
REVISION BY DATE APPR """m01in' SHEET 2 OF 4
430
420
410
400
390
380
20 40
feet
5/4/04
UT2
14TRAL4500 HIGHLANDS PLAZA
173+00
440
430
420
410
400
390
A PORTION OF SW
I.�
ODMA °ANDS PLAZA
PROPERTIES /
1 �
2 �
\ 174+00
o\
o�
-° \ L—_---_—_—It
51697000
Efa?MY lQ&LN RFARJWNTS
I
I
NO
I
11
I
I
[B—LINE
DUVALL AVE. NE
175+00
4A /
jo
D rsca
5
D _D=
�DIP
O
4B o ��
4
1/4, EjE:o, 39
Te23,N.7 R. 5E., W.M.
1 �
T
rn�40
� k
O
D�D OD
D p
\ 10
5A s 8 SD
` 6 1OA
5161100122 I
BP REST COAST
PRODUCTS LLC
C1_
9cv I
G
B—LINE
10 TRAFF2 DETEcraR Loos 176+00 0 ' +00 - -
G 3 _
Z s
6A Ntr� A -LINE \T r q
,g \
6 7 7A �L
0 8�� I \
D
>72.1' HIGH
VENTS
® 6B a�rkap
R
ASPHALT ® D 9.2" HIGH �i •\ �`
STEEL POST
2" VERi. PM-1-1 O
PIPE IN
CONTROL BOX CI.S' qA O /
FUEL CAP
(TYP.J L
3.0' DIA.
DRAINAGE & UTILITY PLAN
- SCALE: 1 "=20'-0"
0.8' STEEL RIM -. r
/ ftl.(ED W/CONCRETE
ASPHALT
� / I
• � I
• \ I
.........
.........
......
.......
.........
.....
.........
.........
........
... .. ..
:: :: :.'
.........
.........
.........
.........
.........
.........
.........
.........
.........
.........
.........
.........
.........
.........
......::
.........
.........
CB TYPE:
.........
.........
::4g"::':
.........
8:: ::::
.........
.........
:: :.
.........
12:.:: CB
.........
...
TY-P
.........
.........
.........
.........
:.:::
8:S7
173+63._
3::. liT3
B: STA
74+23.61
_:. UT3
::::: :::
:::::::::
::
:::::
B STA 17
+16.16
T3
3 B _
TA 1-77+
9.93 ....
::::::::
.........
.........
.........
..
29.
lT .....
......
31:82`
LT ......
....
......
.......
:::::::
.........
22.00'.L
.::::
_:
48':�T.::
::: ::::
RIM=-
4.4:8::::
:::::::::
RIM=40
;8.......
:::::::::
:::::::::
::::::::
- :::::::
:::::::::
:::::::::
:::::::::
:::::::
: RIM= 408.:
}::::::::
::::::::
.........
.........
.........
..
[.[: N:S
= 400.6:2:
:::......
........
:::::::::
:::::::::
:::::::::
:::::::::
:::::::::
:::::::
:I:E•. Nr .
36::::
::::::::
:::::
:E35........
:
.................
..................
..................
.401:24::
[.E:'E)=
tOt.20
:
::::::::
:: :::
R
W)=408
:
...:.:...:.:
.
......
5
B TYPE. t
.........
. ...
RROF SS
:.......
:::::
.. ....
:::::::
::::::
..
_ AOISA
:::: ..
..... .
.........
..
....
.......
iT3..
.STA 175
19.03
...
...
.... :
.......
...
. ..
::::::.
:::..
:
.....-::
137:LP::
:::::::
'::..:::
:P
P:SD.::::
:.:..::
.........
.........
.........
..
......
.........
.........
.......
.........
........
IM=406.1.
:::::::::
... .� ..
..
EX:24".:R
::....
EX � 12
VJA TAR
:::EX:2
":RCP.:::
.........
......
.........
....
.........
.........
.........
.........
.........
.........
.........
.........
..
..
..
.........
......
......
.........
.........
.........
.........
.........
.........
.......
.......
......
.........
..
EX 3:5 T
........I.
LE: :..:I.
N:S)=:4
. (NE)- 40
2:02.....
:06::::::
Tb BE
(........
...........
P OP
R
::::PROP
2 4" Sfl
'
::.:.:
:::
:::
EX '12
:::::
: SD"
PROP A.
:SD:: '
ABANDON
EX
3:5" TELE
.......
....
..
.........
........:
:..
....
....
.......
.....
.......
.... .
I
.........
.........
.50%::.
.........
........
�A
:o-
. .....
.........
.........
........
..
......
.........
.........
.
.......
.......
........
.........
...j....
.........
.........
...
.....
:.....
....
EX.3:5:7ELE
........
.........
.........
.........
.........
.........
.........
.........
..
.......
_::
: ' ::::
E
GT 6T
PEC8
tOA" ::..
129 5
HEDUL..".
]Z:RCP.
.:: '''::
''
24'
SCHEDLIL
:A'.:24'.
SCHEDUL
'A:''.
12..
CHEDULE
A
W THRp
/
CH:SEWE
:'UJ ..
E UT
.....::::::EX
B
STA;
2i::::
UT3'
:::. SEE
.....
ET:UT4
.....
......
B:.STA=1
5+42:06
..
.166
LF ::.:.'
.:
.::
12
SCHEDU L
�A
=
...
:::::::::
:::::::::
: RIM=406
92
ET: U
2::::::
IE
12`: R404:6
t
: (TO :BE:
ANDONE
): ':::.........
..... _ ..
.........
._.......
.......
:LE::24":
.CP_(E)-
02 25::::
::
....::::::
:::.:.:
.E::fS)=
.Q2:25:::
::......
24" R
404:0
:::::::::
......
F{rL_ ��lYfiiCY:
173+00
174+00
175+00
PLn
.p ,^` 33301.9TH AVENUE SOUTH
+g, ffi12 CALL 48 HOURS J`" ! FEDERAL WAY, WASHINGTON
BEFORE YOU DIG BERGER/AB" 98003-26M
1-800-424-5555 E E E 4 I N E E R I M
� VOICE: (206)131-2300
Dips MAIItH 15, ID06 FAX: (206)431-2250 NO
---. n_ un>sr,c ., ,,.. v.0 ...uwr �,_u--. nlvWl�.n✓Liu_n bli•uM.4...In�.r...,:...1„/_°IA-. 4..4.I
REVISION
176+00
BY i DATE i APPR
AS SHOWN
-� DATUM
177+00
CITY OF
.. RENTON
Plonning/Building/Public Works Dept.
440
430
420 1
NOTE LEGEND:
O DENOTES PROPOSED STRUCTURE,
SEE THIS PLAN OR LATERAL
PROFILE SHEETS.
OX DENOTES EXISTING STRUCTURE TO
BE MODIFIED, SEE STRUCTURE
NOTES.
OX DENOTES EXISTING STRUCTURE TO
BE REMOVED, SEE STRUCTURE
NOTES.
RELOCATE HYDRANT ASSEMBLY PER
CITY OF RENTON STANDARD PLAN
BR-24.
RELOCATE WATER MAIN METER PER
CITY OF RENTON STANDARD PLAN
BR-42A.
O7 SEWER MANHOLE TO BE ADJUSTED
TO GRADE.
3❑ ADJUST WATER VALVE
BOX/MANHOLE TO GRADE.
❑4 HYDRANT MARKER, INSTALLED BY
RENTON FIRE DEPARTMENT.
5 CONSTRUCT FOUNDATION AND
RELOCATE STREET LIGHT AND
JUNCTION BOX PER CITY OF
RENTON STANDARD PLANS JR-06
& JR-35.
ADJUST MONUMENT CASE AND
COVER TO GRADE PER WSDOT
STANDARD PLAN H-7.
410 D SSeWe, LC
A-4w%oCM—r. rt� s< •
i!%t 1�•E � s
400
390
80 10 0 10 20
1"=10'
VERT scale feet
20 0 20 40
1 "=20'
HORIZ scale feet
NE SUNSET BOULEVARD (SR 900u 5/4/04
DUVALL AVE NE INTERSECTION
DRAINAGE & UTILITY PLAN UT3
SHEET 3 OF 4 _
CD
I
i 2 i
I 1
�nl 4 )NO
~' I ,l 8+00
Z � 3 -I -
WI FOUND 1/2" REBAR
V1 3 W/CAP 'HARSiAD
LS/ 1J781
A PORTION OF SW 1/4, SEC. 31
_LdQL
p
[�I�,\ J
12 STORY
1 OLDG.
—T O 3�
I I W
s V) I
rsm sua s KING_ COUNAI
OF RENT
D D O
T T T
U v
+00
fE \ 12' DI
w s
T T T T—
D
—
FOUNO TACK —�
IN LEAD —
O.J' OIA
' I STEEL �O
s° 1 0o 0
o V90R1
- I Fl%p w ca`�rr`eNEie � 0PwNu'�ue�Sl�(jjlll0
71PICAL Il,•�
440
430
420
410
400
390
38
T. 23 N., R. 5E., W.M.
nUVALL AVE. NE
180+00 181+00
12-
D�" D " D �� D D W D D—
T T ��--�T��T T T T T T
D D D D D— 0 D D
— �T— — T — — T ——T-1_�T-
a-
1
1 P i
I EA
I \ 1 STORY 1
1 6LDG. I
[[l\\
1 ,
1 ,
DRAINAGE & UTILITY PLAN
SCALE: 1 "=20'—O"
...—
C
::
CB
2:48
........ ....
.
.........
.........
......
......... ...........................
... .U....3T...
....8...:. ...:
.
..
....
U::::::
:STA :1
E.
.TBST
17909:9
:.::
...
'::::::::
::::....
PE:2:CB:
:GB:
.E:2..:...:...:4:B
......(22.00
4..:..::.
:..
:.................
........
4L
RIM=1
.......
....
.........
.
.
,................
T.::RIM=414.
402:42:::
:::::::::
::I;E._ N
410:33 ::
::::
::::
......:::
:':::::::
:::::::Rl.
= 416.56:
...:: ::. ..
RIM
41.7.01:':
.
:: I;E.. W.
a92.3j:::
::.
EX
6": WATE.
....
.....
I.E
:24":RCP
(fd)=41.1... ;;::
:I;E.(
)=4......
:::::
..
:.....
:::::::
:::::::::
:::I;E•. W.
)=403.2.
:::
::
:::
:::
:::::I:E.:24":RCP.
(S)' 411:::::
::.
.......
....
...
..
3: EX
6".:WATER
:::::::::
......
I:E.:1$".:RCP.
(E):=411:0 ::.:
:. .
2.
X....::::
TELE
::
::::::2h
....
........:.............
::::
::::::EX:
":ITLE
.......
":::
.....
..
..
....::::
::.:4:
:.:::
..
:::::::..
:::::Ex:
-
=-SCHEOULA
:.
..........
�243%:............
.......
..._..
::::.::
........
.......... .........
....
.... ...
.........
......
......
..
.........
.........
...
. ...
.........
.........
.........
..
........
.........
....
. .......
....
" : 30:
F:......:
....
..
...
....:
EX:
4': RCP::
:........
'
..:.......
..
EX -CB
0 TYPE
CB
EX 8
5S
9mff
X .F414.05::
T
PE::2 CB:
D-5
B,STA_17
+39:18
..
...
1.59:2
186.-LF
2d9
Lf:. .. -
..
(30.
"...'
M=41E.
12.:SCH
DULE :A.
12'
SCFiEOULE
{i
' '
RIM:
::::::::
_5EE
.....
.....:
....
SHEET:U:
.::::::::
:...
LE:
=408.91
:::::::..
.::::::::
I:E: (NW)
41_T.35::::::
_:
)=408.B
::::::::
.E.: {E7=4
1.62:::::I.:E.:(.}
409. .
:. ...
(UNABLE:
0_DETEf2.INE:PIPE;
ICE
.
AND TYPE
.W/O.Efd-
RMO_)::::
........
......
178+00 179+00 180+00 181+00
4 L Pg�J _
3=19TH AVENUE SOUTH
nsLe CALL 48 HOURS~ 1 FEDERAL WAY, WASHINGTON
BEFORE YOU DIG BERGERIABAM 98003-2600
Wu 1-800-424-5555 E M. 1 A E E E t i E e. VOICE: (206)431-2300
Ex —pm- ;;F—w -6. zm ? t FAX: (206r431-2250 NO.
440
430
420
410
400
390
80
��. AS SHOWN
DATUM
REVISION BY DATE APPR
NOTE LEGEND:
OX DENOTES PROPOSED STRUCTURE,
SEE THIS PLAN OR LATERAL
PROFILE SHEETS.
ODENOTES EXISTING STRUCTURE TO
BE MODIFIED, SEE STRUCTURE
NOTES.
OX DENOTES EXISTING STRUCTURE TO
BE REMOVED, SEE STRUCTURE
NOTES.
�1 RELOCATE HYDRANT ASSEMBLY PER
CITY OF RENTON STANDARD PLAN
BR-24.
�4 HYDRANT MARKER, INSTALLED BY
RENTON FIRE DEPARTMENT.
10 0 10 20
1 "=10'
VERT scale feet
20 0 20 40
1 "=20'
HORIZ scale feet
MY OF NE SUNSET BOULEVARD (SR 900)/ 5/4/04
RENTON DUVALL AVE NE INTERSECTION
ncc
Planning/Building/Public Works Dept. DRAINAGE 8 UTILITY PLAN UT4
SHEET 4 OF 4 . 11
-
FLOW CONTROL STRUCTURE NOTES:
1. REFER TO WSDOT STD PLAN B-3 AND ASSOCIATED PLAN
o
NOTE 1 FOR VERTICAL PIPE SUPPORT(S).
1=
2. REFER TO WSDOT STD PLAN B-3 AND ASSOCIATED PLAN
NOTES 4, 7, 8, AND 9 FOR SHEAR GATE.
-
3. REFER TO WSDOT STD PLAN B-3 AND ASSOCIATED PLAN
NOTE 7 FOR LIFT HANDLE.
4. REFER TO WSDOT STD PLAN B-3 AND ASSOCIATED PLAN
NOTE 1, 2, 3 AND 5 FOR VERTICAL
RESTRICTOR/SEPARATOR PIPE.
I c
c I
i
n
to
to
5. REFER TO ORIFICE ELBOW DETAILS SHOWN ON WSDOT STD
PLAN B-3.
6. PIPE SIZES AND SLOPES PER PLANS.
7. OUTLET CAPACITY: 100 YEAR, 24 HR STORM EVENT.
8, METAL PARTS: CORROSION RESISTANT. GALVANIZED PARTS
TO HAVE ASPHALT TREATMENT 1 PER WSDOT STD SPEC.
9. METAL OUTLET PIPE CONNECTS TO REINFORCED CONCRETE
PIPE. OUTLET PIPE TO HAVE SMOOTH OD EQUAL TO
CONCRETE PIPE ID LESS 1/4
10. FRAME AND LID PER WSDOT STD PLAN B-25.
49'-D" S �tiK�
----------------------------------
NOTE:
ALL VAULT AREAS MUST
BE WITHIN 50' OF AN
I
ACCESS POINT
I
� I
I
I
i
I
FLOW
I
12" RCP
OUTLET PIPE
ORIFICE ELBOW
SEE NOTE 5, TYP
FINISH GROUND��
n PLAN - DETENTION VAULT
�J SCALE: 1/4-=V-0"
FRAMES, GRATES AND ROUND SOLID
COVERS MARKED "DRAIN" WITH LOCKING
BOLTS. SEE NOTE 10, TYP
RESTRICTOR PLATE
WITH 1.50" ORIFICE m _
CUT ROUND
AND SMOOTH
PIPE SUPPORT LIFT H
SEE NOTE 1 e SHEAR
FLOW SEE N
RESTRI
OUTLET EL=394.67 _ WITH
o z
_I � SEE NOTE 9 e CUT R
FLOOR GRATE WITH
2'x2' HINGED ACCESS z
DOOR (1"xl/4"
GALVANIZED 4'-0" MIN o
METAL BARS)
RESTRICTOR PLATE N
WITH 0.50"
ORIFICE CUT
ROUND OTH
CALL 48 HOURS
8r• BEFORE YOU DIG
1-800-424-5555
� �ucR to zaa6
7n
n
EL = 398.98
DET DESIGN WS 398.25
ANDLE, SEE NOTE 3
z
GATE, 8-0 MIN,
OTE 2 N a
W Ir
CTOR PLATE ^ V) �
0.50" ORIFICE io
OUND AND SMOOTH
18"0 RESTRICTOR/SEPARATOR
PIPE, SEE NOTE 4
49'-0"
A SECTION - DETENTION VAULT
SCALE: 1/4-=1'-0"
33301 9TH AVENUE SOUTH
FEDERAL WAY, WASHINGTON
BERG��ABAM 98003-2600
VOICE: (208)131-2300
FAX: (206)431-2250 NO.
1n'-n"
c
I
CESS DOORS OR
vIOVABLE PANEL
AVERAGE 1' SEDIMENT
STORAGE (FIRST CELL)
0.5% MIN, SLOPE /
TROWEL FINISH
SECTION - WET VAULT
SCALE: 1 /4-= V-0"
ACCESS OPENING o
WITH OSHA +
CONFINED SPACE r-
WARNING, TYP a
V)
a
INLET PIPE o
I
O
FLOW �►—
23'-3"
REMOVABLE
BAFFLE
a
V)
a VENTILATION PIPE,
12" MIN, TYP
LADDER
"V" SHAPED BOTTOM
OUTLET PIPE J 1ST CELL I 2ND CELL
7'-6" T 15'-9" "t
PLAN - WET VAULT
- SCALE: 1/4"=1'-0-
72" STAND PIPE
SEE NOTES 1 do 4
z 13 LF
12" RCP
e °�o
WQ DESIGN WS
398.35
STANDARD GALV z — INLET LE NE
STEEL LADDER e DEPTH 5
/ � DEPTH 5.25' _ = 396.25
STEPS, TYP e
WALL fANGE, TYP z z
o
® N
\�EL (NE)=397.25
BOTTOM SLOPE 0.5-2%
BOTTOM SLOPE 0.5-2%
TOWARD INLET END
TOWARDS OUTLET END FIRST CELL SIZED
OF SECOND CELL FOR 25% TO 35% AVERAGE SEDIMENT
OF WETPOOL VOLUME STORAGE 1' MIN
SECTION - WET VAULT
SCALE: 1/4-=1'-0-
As SHOWN A� CITY OF NE SUNSET BOULEVARD (SR 900)/ 5/4/04
� RENTON DUVALL AVE NE INTERSECTION
DATUM Plannin Buildie/ n Pe/ublic Works Dept P DRAINAGE DETAILS UT6
REVISION BY DATE APPR �""®1p'n•
�� 12 m25
t r'nr'Alr%
LCVCIVLJ
"IS I INCH
FOUND TACK IN LEAD
o
BOLLARD
O
TYPE 1 CATCH BASIN
a
POWER TRANSFORMER
a
TRAFFIC SIGN AS NOTED
Br
TV RISER
!�
TELEPHONE MANHOLE
ED
TV ,JUNCTION BOX
STREET LIGHT
®
BUS STOP SIGN
X1
YARD LIGHT
[D-
TELEPHONE JUNCTION BOX
o,,e
STREET LIGHT CONTROL BOX
®
CABLE TV VAULT
mw
POWER METER
®
CABLE TV VAULT
mti
POWER JUNCTION BOX
WATER BLOWOFF VALVE
IS
WATER METER
O
TRAFFIC DETECTOR LOOP (TYPICAL)
WATER VALVE
Ip
GAS VALVE
gym/
�_?•
CONIFEROUS TREE, SIZE AND SPECIES AS NOTED:
GEOTECH BORLNG
C-CEDAR, D=DEODORA. Fa FIR. H=HOLLY, HM-HEMLOCK,
�.
J=JUNIPER, M-MADRONA. P-PINE. S-SPRUCE
-...—...—
DITCH
O
DECIDUOUS TREE, SIZE AND SPECIES AS NOTED:
—•/vim'—
AERIAL POWER LINE W/ TELEPHONE
A -ALDER, AP=APPLE, B=BIRCH, C=CHERRY. CW-COTTONWOOD,
CN=CHESTNUT, D=DECIDUOUS, DW-DOGWOOD, H=HAWTHORN,
POWER LINE
P-PLUM, PP -POPLAR, W-WILLOW
c
GAS
o
MAILBOX
--1—
TELEPHONE LINE
®
MONITOR WELL
-fo—
FIBER OPTICS LINE
ME
WATER SPIGOT
----------
STORM LINE
�:�
SEWER MANHOLE
- - - - - - - -
SANITARY SEWER LINE
TRAFFIC SIGNAL POLE
- - - - - - - -
WATER LINE
i
TELEPHONE VAULT
- -
RIGHT-OF-WAY
P
POWER VAULT
-
RIGHT-OF-WAY CENTERUNE
O rSC9
TRAFFIC SIGNAL CONTROL 80X
FENCE LINE
BUILDING
CROSSWALK SIGNAL
®
FOUND MONUMENT AS NOTED
CONTOUR LINE (5-INTERVALS)
a.
TELEPHONE RISER
an
TELEPHONE MARKER
CONTOUR LINE (10-INTERRVALS)
®
POWER TRANSFORMER
SHRUB
PROPOSED
cart
CITY OF RENTON
RP.m
RAISED PAVEMENT MARKERS
SANITARY SEWER LINE
p.
POWER RISER
®
FIBER OPTIC MANHOLE
04
SEWER MANHOLE
4o
SEWER CLEANOUT
8I Roth Hill Engineering Partners, LLC
71300 t IBM Awru Ifi iltA
Rot H i I I T 425. B°°°'
F-425,MAIRO
B"'Al � CITY OF
W" s RENTON
� DATuu
Planning/Building/Public Works Dept.
NO. REVISION BY DATE APPR
SUNSET INTERCEPTOR
PHASE 3
INDEX SHEET & LEGEND
4/13/2005
ovv rcj-0
1lE7¢ OMIMIIAE RHE Ne3'MI® iSulA TOPOWP.0 YAVEY �®!r YT[H ILL
B[3IEtIBG Y,IS®IPOItAROEiT aAi1L MMCE O]af♦DeIATEe 1tHERu'B®e1
POOtAT10R YIONIIB BAI®IFOM R(LVIm RBP/�Ru1TIE REIP£CTT£11Tt/TY
TEt8RB 6eI001 PYEt](�Ip 910Y1YT1E f110fiF AlE GIII�Ai®Gl�tiVliSD
YR.MeAM KlAMDA 191091APNCtt/!RYABVOh®!Y 191�Y.pW
MWm6R P$D LDGITro dF OBPi9L4SE f0[IL'r6 OP � VIM®. 011MT® OF TfE
PRO-e
F]6H:T®InuTOBN nEUIVIIamarE rsnlnaTw�wwlmro�s»Iouo�
YAYFf MY6lT BLYA11010 fORA0Mt9(f GTOI l4toBM6ETWITMOWAS%1MB
worE: mnVA"coma�orvmae em�m
NOTE: CfTY TO
FY LOCATION
BCN�+i .c ox rte manwrAMr. nalMwas euA�vurte A0e 9e�Atar.erar erArow
m"
fiOlp6�YB M
BNQ®NTIEMLOCK7t
AYIAAYE eOPE siT]OIDWM aat»ARE 9MOYNAr AtsA®O�i1lS A/y anEaevnm
RAM MfN mFWIM MNiARf
MP.eINO FA4T6 eT—Y MaM RIBET OLXENet eur llQltDE THE bv(fARYtss�
w.rs aM au�Y1uPINaAMD YTY®13fAT10M
MIS 10T SF CMXDK
M+AL UTSYt AIOl lDGt71010 AfE MQfaunt OC�fYMEi TET CaIAC eE
GB.M
CAOS 1 NTEPOWUAAE9gM1AT A101 DSMWALfWIDEFf TlE9EVlEffr
acre PwPS AIOWMQF9
I
OF SIDE
ERS
ETw®I6TAT061@�AMD
IwmAMD xs.m aM DUIauAMaaE IIE tlMThPDBItB�1'B)RIDYYa:rlr>E
aBrtsar�. n8lE wveE AnaffgMN llTIflFE wrw T}E Ro�o�slr.enraluE oa Aeamm
TIMT NE MafRuwoMn�DAnrm
Qc*49m BMmw ATTVTffE TEDUTiw.TaA swiBE�®lF saclsaT'Pn
ItE HtvATlf66VRm aaxamPraDammPBlwr<.-iw
waTra+ur�vo maeeilr e011�V�SPiR TlE eatsE Ra>ESTuna wMol wrMlue
asrtcnB oM TM� Draanres.
1
6' DtA")N KCAL
F(e' olAu) TrPKcu
i
GS
� l
TL/516970-Dt15
1 I
I I
\V------------------------------------------------i5
a .........
..
....I::.:
_.......
...._...
I:I:::... I:.......
...I.....:::::::I::::::::::::::::...
......-
::::._::::I:::::::::::::::::::::::--
.
.........
.........
......::I
::::::_
:....
: ..:::
.......
::::I:
::':'-
-..
........
.........
. ........
.........
.........
.
..................
.........
.........
.. ......
.........
.........
.........
.
..
..... ..
.
"':
::::
':
:':
:::" :
......
.........
.........
_ .........
.........
.........
.........
.........
.........
.....I: I
.........
...
...- ...
.........
.........
.........
.........
.........
.........
.........
.........
.........
.........
......... .........
......... .........
...
........I
.........
.........
.........
. ... ...
.:...:..
.
.....
..::::.
.
.........
....:....
" ..:
::
......:
:: ::::
:::::::
::::::
:::::::
"
.......
:::
:
:::::
::::
:':I:::
:..
...
::::
:::::.
:::::
:::::
:::.:
::'
.......
. .....
......
......
4Q:
8
.........
. ........
.........
.........
..
...
.. ...
.......
.........
.....
.........
.........
.........
..... .............
.. .. ... ...
.....
.........
....... «
.POSSE
PC PEA
TF1 ....
ORO ORAUNM-
.........
.........
.........
.........
.........
.........
.........
.........
........
........:
I:::::::
.......
.......
.......
.......
.......
....
.......
.......
.......
.......
...
r iX
..
.......
:.. .:
... --
.. .........
.........
:..... ..
....
....
..
..
.........
.........
.........
.........
... ...
.........
.........
.........
.........
.........
(APPR01LtDG
.........
.........
.........
.........
.........
.........
.........
...
........
.........
....... .
.........
.....
.........
.-.......
.......
.......
.......
.......
.......
.......
..
...
.........
......
.......I:
.......
.........
....... .
W.........
.........
z
.........
.........
.. .. ..
*.....
..
..
..
.........
.........
.........
.........
....
....
... .........
.. ..
.......
.........
.... ...
........
....
.......
:..-.....
.......
:.......:
:....::::
......-
:..
....
.......
....
... ....
.......
.....-.
......
.......
.......
.......
.......
.......
.......
.......
.......
.......
.......
.......
.......
:::40:
.......
:.. ....
.......
..-....
.. .....
.......
.......:
.........
tti .........
. ........
........
.... ....
........
.......
.......
..
..
..
.........
...-.....
.........
.........
....
....
.... ..
.... ..
......
......
.... ....
.... ....
... .�....
....
....
..
..:
.......
:.......:
:
....
:....:
.......
:......-
.......
.......
.......
::::::I
........
.......
.......
.......
....
.._.
.:
......
....II
....__.
.......
.......
.....
.......
.......
.......
.... ...
.......
_. ....
::.:
.......
::::
.......
.....
.......
..:.
.....
:::.:::
.......
I:I::::
...
..
.......
::::..:
.....I'
: ::::.
.......
:::::
. ........
.......
.......
..
.........
...-.....
.........
..
......
....�::.:
:..:
::.
:........
....
':
......
.......
.......
.......
....
.......
.......
.......
III::.:
.... ...
.. ...
.......
.......
.......
.......
......
.......
.......
.
:G
.......
..-....
.......
.......
. ........
. ........
.......
.......
.......
.......
3fl :::
::::::::
.........
:::::::
:::
::::�::::
.....
:::::
:::
:........
.
.......
......
...-...
.......
.......
.......
......
..
�ioo LF
....
....
:
.......
.......
...
.......
......
..
......
.......:
.....
.......
39
.....I
:.......
....I::
.. ...
.......
......
.........
8 .........
.......
.......
.........
.........
....
.... .
.......
.....
...
.........
.........
.
.
.....
.....:
.......
:........
....
51? :pot
..
.. ..
p :... .
�:
....
':
...
.........
. ........
.......
.......
...... ..
......
.........
.........
....
....
.......
�:a5
.... ...
PVC::
LF...
:..
...
......�2
......
....
.........
........
.......
.-.
:::::::
::.....
�.::
::..
.".....
::.:
.......
.....
.......
..:..::
.......
::::::
.......
.......:
SSr]H
5Tk'172+
9
,11.L ....
.......
':
..
,.:..':.
.......
.......
...--�-
.........
.........
........
......
..
......
.. .........
....
:SLR
.0045
.15..
-lu
VC.�..
t
3.
...
5.. vG
.....
.........
.....
.........
.........
..... ...
.........
.......
........
........
.....
...
93NH
ois
�:y:Q:L::
'. ..
..
:.......
.......
.......
.....
IE�
I......::
; 4
� 4.G
.:sr t
:q b:
: :E
/✓�� .:
f 4i
::::::::
.........
g
........
.:.
.........
.....
.....
.....1::
....
.... ....
.........
, ...
....
.........
AI.
.......
_
....
le
rL�T
.....
...
::
.....
.... .::::
PROP.
.9
'SS
.........
_'
IE 392.9
10-NE)
::::::. ::::EX-:.
. 90 ...
OP.:
90AT
ST.
168t9 : ; 1
LT:: " ::::
...:::..
.. .
.: ::::
::.....
.....-.
.......
.......
....:::
.......
.......
.......
.......
.......
.......
..... _
.......
-.....
...-...I
.....:.
.........
. ........
.....IEo39
.... .IE-39
15
-
. ,.....
15 .PVg.
IE= 392.3
WS ) ...
......... ....STA.1
.. : ...
1E�391
8{62..22.
5 EX.+15
(
(((1-
ti.
tE=392
+85. 22. R
5 15 N ..
(( )
......IE-
......
2.35 d6
))r515T
NW ....
N F ....I
.........
.........
.........
.........
.........
......I:
........
..-.....:
...
:::::::
...
-
I
. ........
:35 t?
15.
::12 LE...
PLUG.
ON 31
-S
FOLLOINNG.
::::
-391.
- ..
5.
R. IE.392.
:.15. VJ;..
......IE-
�.
JS.7
.....
..-..
::::::::I
.........
:::I::...
.........
:........
:-......
...-...
.......
.......
..-....
-......
..-....
.......
...-_..
._._...
.......
.......
.........
.... .IE-39
.........
:25
..SL 0.003
_.
.Ie..3928
. £jLTO .
.......-.
.....-... ..
-PLUG '
UAN
.........
.........
.........
25
.....1 ...
S E ...
.-...
.........
.......
.......
.......
-......
......
.......
.......
.......
.......
....._.
.. ..
...
_..._..
.. ..
.......
.......
- ...
- ..-
::
'::
IE= 392.9
EIC.IO'E�.
..
-::'ME F
'OVATIG ':
..
...:
�.
....
.-..
�..
�..
.....
.. -
.VERIFY IN
T& PRIOR
....
..
I -39
7(
W
... ..
..
..
..
..
�..
..
...
...
...
..
..�-
.. ...
...
....
..
....
..
.:....
..
TO G9t+NE
71orv.
fY
EVFMON. RI
. .
-
....:::..
..:.::...
:::............::.
.....::.. ::::TO
.. :
-.
........
......-..
.........
.........
.........
.........
.........
.--......
......-..
...-.....
.........
..-......
.........
Roth Hlll Engineering Partners, LLC _
1>D011&Yl Avene NE n00 SCALE 1-=zo' .�t�..:P�.I �., ,� SUNSET INTERCEPTOR 7/5/2005
CITY OF
20 0 20 .0 I "m -n RENTON PHASE
R o t h H i 11 �"'•�`
Tra2s.te92M ( FEET ) I -i DAnN Planning/Building/Public works Dept. SEWER PLAN AND PROFILE
v FQ425M.1190 1 INCH = 20 I, NO. REVISION BY DATE WPR -� �" �= NE SUNSET BOULEVARD
3 :. 8
i
A9ilALi � I
---------- I---�,
o �QQ
J1Y 0-41"
UfLfiB Nr"tlWAT01 ®6l'®ll'fA/iEtAf�4 RE®4®fiia•1 TlE Af�K'fNF URIh'
TI$¢fMM1AiE-EK PREPAA®-A TOPOGRARY:R 11tpC1 R MLL
EN[ S6 'O3A1® WON AFRF.EGT Mild VAF Ca0Rp1N YaE
1/E0H'I1C DF[IOOI P'PE(%SflM69 YOYM MIME PPaFiEYEfI11]UT®M�uO,iBD
PRDMM FELD IflGM16 memPARE PDRTO MnOMIEUTL E&ESTY MTf TlE
FlaSl®LL%AibaaP EMOtIfEDIDMTKiW610iPaQIDtE MD UF01
NU1O®61
�BWNMI@6N®CS �CIMOA7�a�tMQ; IlA�F11600CEp 9Y g0'AdYI
LIVET OF M9lT9MATOY WN M�Y�lf Gl01lA10 YM@f TIMT MV1�Nlb16
70100
tllCAIgIM PpaAfID YIIE lOP0010WCHfREYRSFtO'Y GEILi6tMYl ElL'bE K M
OOR fts �1TART. RQnfltllYYVtY 11Cf1 ARE DEIBtM111ESf06fAT[ll
A�WINE Y1ElRfOItltAYO96Y1G1ME ATAgI®DEPnR Nl anBl U(VfY
UlE1ML AlO®tY10<UYYal01m ARE Maf IDOMIF]Z9TM61E If ET CdiDE
1it,oAlO Etsr DF lTATIDM IiNCaFaMEf
OI ffl TEMQiEMEYI]MI ATA64 CED AMM DE MOFT)EEU
TFHE WTlEAOOfn01VL Uilti8lYFI/M T1E ItlADM1,ErtIB1lAE OR ABAI�Ea,
WMQESIEIR®IdTAlgM 1Q,ro A101MAO161s�TROlPfJp NO SE1fE�l iTATkl6
0RD916 15R XCM MrMSTME T CCNTR MRS XERES06dEw AWMa
TBT—
TYNT ARE YDT90'AF OM TIEg OAAIQs
11f�A10IDMm OI CINAIl AYBAE TFE ORMTY25 REID1H ROtl 11111n11E
TIEHEYAI[f16TEUR1 CFCO�lMrtaDRTa(DSIRLTION
RIQ•(TffiM1 At[I PR[yBifY YlId11 JfOR T1E Blif�Ai6EL'f 11f181MO1Ran11LL6
REii8,114I DR THE ORAMtlS
A9TF" CJaAACiURBW1�EVElDPd$HiITPAS$
- nAR YIEiI [aMECIMO ro EA4S1D ANOTARt
' aErtaFrRPEauorwnEn
NOTE: C" TO FY LOCATION
OF SIDE IRS
SS t1
.............................
. .
.........
..................
..................
.........
..
..................
.........
.........
........
........ I
.........
.........
.........
.........
.........
.........
.........
.........
.........
.........
.........
.........
.. .........
.......
.........
.........
.... .....
.........
.........
.........
. :::::.
......... .........
........
.........
::: :.
.
.......
........
.........
":::
.........
...... ..
:
....
....... .
.. ..
.........
.......
.........
.......
.... ....
::
.......
.........
::
.... ..
........
....... .
.......
.........
::::::
..
.....
.......
.........
..........
.
.........
_ .........
.........
.........
.........
.........
.........
.........
...
.........
..... ..
.........
.........
.........
.........
.
........
.........
.........
.........
.........
.........
......
.........
.........
.. .........
.........
..
.........
.........
.........
........
.........
.........
:...
.......
........:
. ....: .. .....
:....
...
... ..
:'":
.........
::::::
.... .
:::::::
...........
....
::'.
" ..:
:.
...
...
.........
.......
.......
.......
: .......
..
.. .
......
.........
..
o.........
S .........
.........
...... ..
.........
.........
.........
...
...
...
........ .
.........
: ......
.....
...
.......
.......
.....
..
.......
....
.....
.......
....
.... ....
......
: " ::::
.........
.....
..
.........
.......
:::::::::
:::::::::
:::::::::
::: :::::
:::: ::::
:........
::::.:::
.............
:::.::
.
.........
....
.........
y.........
......
......
..
..
.........
.........
.........
.........
.........
...
.......
.......
......
.......
.......
.
�: .-
.....
.......
.......
.......
....
.......
.......
....
u.........
i........
.
..... _
.. .........
......
.........
...
.......
.....
_...
..
...
......
.......
.. ..
.......
.......
.......
.........
......
..
.........
........
.........
.........
.........
.........
.........
.........
.........
.........
.........
......
�:....
:.......:
:.......
.........
......
.....
........
.........
.........
.........
.........
......195
:
:.......:
.....
.......
.......
SL=9;00
.......
.....
......
....
.......
....
...::::..
:
:::::::::
":::-....
.........
.........
.........
......:::
.........
.........
EX. S511H
t(a �8 - .........
-.......
.......
-:::::::
:::::::
......:
::::"..
:::::::
:::::::
:::':::
:::::..
..... :
:::::::
:::::::
:::::::
:::::::
::::.._
.......
.......
.... ..
.........
.........
PROF..
...:276A :
.........
.........
.........
:STA :T7.fl+
T,:t3':Li:: .........
.......:
.........
:.......:
.........
:......
.......::
:-......
.......
.......
.....
.......
.......
.......
.......
...
.......
.. ....
.. .........
.........
.........
E- l
}:4i4 At.1' 1
(
:::::::::
:::::::::
:::::::::
:::::::::
:::::::::
iE-403.0%
a f)......
.. ...
.......
.......
.........
.......
.........
....:
.......
.........
:.......
.......
..
.......
.......
.......
:':
......
::::
.......
.......
... . ..
.......
. .
.....
3:(.l5" ::
:::::::::
....
.......
........
.......
.......
.......
.......
.......
.......
.......
.......
.......
.......
.......
.......
....:::
::.::::
......:
.........
.........
.........
.......
..
.....
...
...
...
. ..
...
::::
.. ..
..
..
..
. . .
.......
. ...
17
w ...
... .....
. .....
... .
........
.........
.........
.........
.........
.........
.........
......
...
...
. ..
....
........
Roth Hill Engineering Partners, LLC _
e �. �e1"a 20 0SCALE 2O 40 U& t'=zo' �® '" i� CITY OF SUNSET INTERCEPTOR 7/5/2005
REN TON PHASE 3
R o_t h/H i I I T.14�� ( �r ) � � I. i Planning/Building/Public works Dept SEWER PLAN AND PROFILE
V F.AaS.aw.tTeo I INCH - 20 FT NO. REVISION BY NE SUNSET BOULEVARD
f
U \ �54'0 MH
\ \
54'0 YH
\y
EX. 10 'CONC. W
FILL. IN EX i�PLUC k ABANDON
IETP RECAST I I I I —NEW PRECAST
YANHQE BASE
MANHOLE I AFTER PROP.SEW R IN SERNCE
MANHOLE SECnoN
CHANNEL (T'YP) .�
gCt7M
48'0 MH
I � \ EX. YH-0 UNKNOWN
z
f
�
2
L
:
:
i
0
--
c
RECHANNEL EX ay1
MH TO
-
��
i ACCOMMODATE \5
. r
NEW FLOW
DIRECTION (TYP) b
NEW COWLING
� `-` _
\gam
`
\� J�_J{{ Ex B CONC.
``��V�+� M0~'�N+
I````\
(llT'IGIL)
4'- 0' f%711PAC1ED
BEDDING uATt:.TaK
EMIIW SEPFR YAM
AG COLLAR MH ADAPTER
EX 12 CONC OUT F ^
(% �P• SiRrVtf /� SQf V Vu
FOR PVC PIPE ONLY (TYP)
ELEVATION
3 EX. MANHOLE 90 DETAIL MANHOLE 87A DETAIL
MM�� � PRD
1
MANHOLE 90A DETAIL
2 MANHOLE 90B DETAIL
�Q NTS
1. CONTRACTOR WILL TEWPORARLY PLUG UIE AT UPSTREAM MAP04OLL
NTS
NTS
"^
EI)5E 2 PAND REMOVE EOSTINC PIPE
'CONC.
1 PLACE EOSTIMG PPE RrTH NEW A.0 OOU_AR5 THROUGH NEW MANHOLE BASE SICCTOL
CUT PIPE SECTION CONTAINS A PPEN. E BREPLACE PPE WITH A NEW
i EX 10
IN
AS
I
EXB-PVC N Df�_ sNCA ^ i ^ SQY V \ �.!
STRAIGHT
STRAIGHT SECTION OF PPE, OR OWCTED BY THE OSTFSCT.
4. SET MANHOLE AND PPE N P(ACE TO PROPER AOGOEXT AND GRADE
"
S4'0 MH
a
c 1 '
N '
'
: v ' i FTC lei--0 UNKNOWN
Y fECONECT PPE CO IUMMS (RO AC. Md SLEEVE OR PVC SIP COUPLNG).
6. CHANNEL MA CLE PER CITY STANDARDS.2
»
;\' __ i
\7�1
l
x �' N' �EXB'PVC (ABANDONED)
t
7. BEMIRE PPE INSIDE MANHOLE-
EX PIPE -UNKNOWN 00Jf
EX 10 'CONC, IN ` � �
MANHOLE CUT —IN DETAIL
\5
' /
ACTIVE CONNECDON
Q A
�StAvaA• n
NOT TO SCALE
�
titr
P��(►. i
� —RECHANNEL EX.
MH TO
---
FlLL INEXL.
MANHOLE
RECHANNELIX
.L --
ACCOMMODATE
NEW FLOW
�031 \';
CHANNEL (TIP)
N u;
EX MH-. UNKNOWN
TOANNEl
ACCOMMODATE EXB'PVC OUT-1.-- - DIRECTION (TYP)
DRECTTION -V
I l
IE K. I �p �' RI4 MCP 1j tG/` Tu
G SSMH
(TYP)
`\
EX TO OU
Q1•y t +dY�-fFYl�
EXB'PVC M
FIL H EX
P..p, Se�,r�. i Tel V -cn
MANHOLE
O(AWg'L (TYP)
5
MANHOLE 87B DETAIL
6 EX. MANHOLE 92 DETAIL
7 EX. MANHOLE 87 DETAIL
S M N —
HITS
NTS
-NTS �+
�' 'JG{ ►� N� NJti C iC. S I r
NA, P. TctrA�"
P�r� fY J:'I.�wIM'44C"
g
-DNB -PVC
ETC 48*0 MH
=
4 0..
8OYACP
- 0
-
TRANS.
RECHANNEL EX-
EX8' PVC
.
c.
L
_
ACCOMMODATE
$
i :
NEW FLOW
--- DIRECTION (TYP )
y%� ---N '�EXB' PVC INRE
{---
w
'
HE
\I
tj
G
DB
FILL IN Fx
N MANHOLE
--
ti A
WHEN NEW 15'SEWER
IS READY FOR
) i CHANNEL (ll'P)
) I
' L
SERVICE, RECHANNEL
MH TO ACCOMMODATE
i 'H�EX8' PVF OUT
Pt `S Ad--j w
i '
;�
EX8' PVC OUT
N T
(-�
NEW FLOW DIRECTION
(TYP)
i_ti Pf. p uyr{^
_-J
8 MANHOLE
NL
B DETAIL 9
(r
i� 5.144
X. MANHOLE 216 DETAIL
NTS
10
EX. MANHOLE 72 DETAIL
NTS
A � Ill,
k�ufV
s" SEWER MANHOLE
CHANNELING DETAILS
P,..p
8 Roth Hill Engineering
Partners, LLC —
�IIO 11MAwne NE t100
R o t h H_i 11�
TM 4zsaeas44a
/
of y
Fu425M.1190
NO.
REVISION
BY DATE APPR
54'0 MH
[ANNEL Ex NOTES:
)MMOOATE
FLOW 1. ALL MANHOLES SHALL BE CONSTI
.TION (TYP) SPECS. UNLESS OTHERWISE NOTI
2 THE MINIMUM CHANNEL DEPTH IN
BE 314 THE INSIDE DIAMETER OF T
3. CORE DRILL ALL NEW INLETSIOUT
MANHOLES
�tf
i
.i
8'
r MA i4.
MANHOLE FRAME AND COVER
E P� DRAWINGOR29
(a" MIN.)
2i• a' FRAME AND L8
PER DRAWC 0112, sP PACE Bma.
tFf PaoaT
Ste e
- r ( t
� r P.L. 1 >' j
NO CIT TO VE OF AVE NT
v
�STMENT
w - K
tay�wssl
\ IN
PRO T Li — G N UN BL & AL VE
-I (
RUBBER CASKETE7 JOWT5 IN
ACCORDANCE WITH ASTAL C-aU
E , T AA® rAOs
. ^•-^ •r waft 9Y¢1 E grtui
'C•
...; p
a" M8t TO
STEPS - 3/4- DEFORMED BAR
-
,r MAIL
aaore tmlmm w 1K TPET3L}Ia15
� �
STEPS SHALL BE INCLUDED
A>o+HALr '4+TCAlY 'E
a-, /2'
-
-
P�
i
CONCRETE RISER BY PIPE INC..
2i
Y YW.
OR APPROVER EQUAL
.•
•A
' i
f,
11 I" —
]/saA [ IY u.Ic Ourt� EPf1if (YJ.Im OO.O 9A%
ta•
_
tun • 1r a m•tER I r 1w• a Au Ea1.a zm
MAX PIPE SIZE - T'
12-
LZ
z
cunt wm
i.•-t!- '
12' (TYP)
t
..•
coaAct¢
1
LADDER -STD. A-U10NuN
�tFP
='
tmo+ e,ouu mcACRO OIfsEO >NAVAaa
AEr >pmuwa tv mrsg
OR GALVANIZED STEEL
lu »xtAan
MORTAR FIU.ET
RETE CONCSHar
a 1;�
x-
f
1 ItTx
PRECAST BASE SECTION
ORCAST N EL SHF.
"�, '
12 A'
CUT AND PANEL REPLA(Dm101 IT DETERNMA7t
••
�' t.
.'- -. .•
`.a "•"'•'•
FULL CEMENT CONCRETE PANEL REPLACEMENT : FOR CEMENT CONCRETE SURFACE STREETSIE, T
6' HNPT. (TIP)
..•�_•'
t. O6 t1EAItaR R SLY l0 E t»
AT IIE PONI®N OF nE lift (IF
Sd 161Td dOE7El
IOBIW RESTORATION SHALL E FULL PANEL REoLALi?E)IT. F ONE OR MORE I THE
FOUDYMC CONDITIONS E)OST;
6'
L Fat
Y BE CAS ]Ot10
'Wr i L nu.T w
A'
.�.
F-7 EX@® M THE NFU L r% kR'09:
a TO ALLOW DE OM TO ElOYOC
T THE NIMT HL1.11a1 OFm mE IO1
H
aB' u {8- 8 H®R S 24 MIK 21 ID.
BJRM DESIGNS. ALL TA£ LOOS atAlt
54" INi MN. SS' MIL. 21 ERN. 24' LD.
t'III.gS:
u¢ eTAOMO XUL emeL f PAX eon
14H 0O' i811 8 INN. t IIIL 30I.D.
AYd
I. STEPS TO BE 3/4' • OEFUOEEL BAR GALVANIZED SAFETY STEPS OR EQUAL
Pw� Jet
smkw CMKFCM OASS mm
2 STEPS ARE TO BE N PUCE BEFORE MANHOLE SECTIONS ARE INSTALLED.
Am a
PA�NI PST
tHaa
1. f180 A t 7/t P w aALYM® .AETT STEP] m [WAN
3. CASTING TO E PER DRAWAC BR29.
{. MANHOLE SECDOLS TD BE E RF760RCED RECAST CONCRETE
"a �
•f'E YAIERAL AS !� OLMQIR am AO 00mER A!
L SWS AR A S w RAG ees4e MA•NH4L 6Tau A11E NmAttn
S OPE1MG SHOULD BE ONDOM$IREAY SIDE.IT
DE pp� tm!•® Iv rtA10A0 ETAL TRAIw6
>a PAX
A aRwO A c 14 aulro OAa
L ALL .101175 SHALL BE6WUTED.
IXOL
a AU. a13 t c aW>m YTE1L9P1T -
7. SANITARY SEER MANHOLES 9011 HA%E ALL rnQOOI SURFACES. NQIEIRNC
a errrAEY >rMi MAYpi/ a ILLK AO IAIQgt zweAesy •Infala tMA1NRK
CHAINEINO. COATED (SEALED) ■DT A NOI SODS UEMAE COATING.
00A>®aWEOI >AL A WN Gam uanwa aoaslR rmL Mo-rtann E
/Hole mMl. 0aat v 00atNC swL eE Krz,
WASSER MG-ARO9EID CR APPROVED Ea1A: COLOR OF COATM SHALL E weTL
T. wl®t sAtmeo ma weal e w mrorArt¢ 1.eH ASTM La•1
d RUBBER GAS E7ED JOINTS SHALL E N CO FO dNNE: WTH ASTM F{N,y
i To IwHOLE wn E Imc �o � 1mAv-�IU e�om a
9. CHANNEL HEIGHT SHALL BE A MMAN OF3/A THE NEE UAYETER OF THE
LARGEST PPE
If•
wE Y
an
Ia rAwaia N)OML W INo arAmt 1WN1 m
A10 FALL PN1m6ovt fTI1Bl wSTAViR
Itst OEa tlwL wLa A �AatnAa' tlAsn
BOOTS OR APPROVED EQUAL
YAM cNN JOKM
THEE BAC611 MAY E USED N LET! OF RESTORING COMM RKiD BASE AT THE 0150SEl1OH OF
THE EM@EERP.
SANITARY MANHOLE TYPICAL
DETAIL
SANITARY SHALLOWMANHOLE
TYPE B
NOT TO SCALE
NOT TO SCALE
8' CLEANOUT FOR 'DRY
SEWER
TYPICAL PATCH FOR RIGfD PAVEMENT
PAVEXNT PATCHING AND 5 ORATION DETAI
NOT TO SCALE
NOT TO SCALE
1 1' 2 5'------{{{ 1'
IMIN MIN (MINI11!r
0
p=po pa° p
°poIo .�I
tEW'
LANE IEE
MARIOG
STMDARD+INI
oQ°p°�
VMIN
K
N
g
StcTyp'Hc ,� RN•.I
A OF R 0
— -- _
),L
Tti�•
P.,t,•+• Je w-CLASS
•
Stye Ty ic.I k CRUSHED
SSURFACINGCP
t
.,
CLASS tbm@R- B'
Lr.diY� Ec.'�'1AIcEne:s
TOP COLME
S0.i
�
YI
�2"
RoEc�1i•"�j bs
6" CRUSHED
7"
OR GRIND L a
c
a At�
TO 6"
C �„r P��E�
SURFACING TOP COURSE
EQU00°'0R
ETJl1K
L
I >aY H
CLASS
CENTER LINE
LANE LINE
OR
ra 44vrYlht fs
CRUSHED ROCK,
Ow6C 2-s
CLAS
PLOWABLE FILL
OR ROAR � FILL
OR
AS
OR AS rEQLwaFD !TY ENGINEER
AS REQUIRED BY ENGINEER
us
'tOYNREI Afp OASS i' s tY T)eC]OESS s+ALL W--
ROI®AL/1010R/OOLLLECTON ARTURIAL STREETS a INDUSTRIAL
ISi
C S
Sqw c.t�3
REA9115ET TWLACOMSaSTRUTS 2' � CLASS 'E' OR V
Q QQ Ac?
O CTR i S '�
"OTC
UPON REO OF
NOTES,
1 At t817Ea. SNAG) IE LDamc LID PER eu vc
ITIINORY co INC
\
TYPICAL PATCH FOR FLEXIBLE PAVEMENT
EST EMIR NEW ROADWAY PAYD"T
SECTION MAY BE DESKXED USM AN APPRO� �7N0D i0N
y Nn E17 (LOUONO) OR EQUAL
.
WHEYPERP
DICULAR TO ROADWAY(.
N FRS IN
2 USE FRAME AND tDKR ELN SANLTMY (L_ •SEVER-).
NOT TO SCALE
IYPICP.L LONGITUDINAL PATCH AND
OVERLAY FOR FLEXIBLE PAVEMFNT
MANHOLE FRAME
AND COVER
NOT TO SCALE
NOT TO SCALE
8—Roth Hill Engineering
Partners, LLC
=01Ift A-1E#100
1-=20'
�`409 �
.} CITY OF
7K
SUNSET INTERCEPTOR
PHASE 3
�6/2005
R o t h H i l l
W tdiryLn
Bd
RENTON
_
TdA25.BB9Bt18
425-
anM
nn
Planning/Building/Public Works Dept.
DETAILS
NO.
REVISION
BY
DATE
APPR
V Fu 425.BBM.1T90
a
PLANNING/BUILDING/PUBLIC WORKS DEPARTMENT
Renton City Hall 1055 South Grady Way, Renton, WA 98055
❑ UTILITY SYSTEMS DIVISION 425.430 7234 Fax: 425-430-7241
�
X TRANSPORTATION SYSTEMS DIVISION 425-430.73�11Fax: 425-430.7376
TO: G,9r� Y !� N ( L L I P S
DATE: �E5z.4 0S` JOB No. CA6- 03 -13
RE: Su SET Zp u LEI LL
1�12G(✓� fI/"I L`a/��N'�E2S N
/V -F C- P" 55c---T-r�^�
33-3 oc %w /Nc SSv,r� 3oo
FED L lt/A Y WA -Tboo 3,- zc, oa
WE ARE SENDING YOU ❑ ATTACHED
❑ SHOP DRAWING ❑ PRINTS
❑ COPY OF LETTER ❑
❑ Under Separate Cover via the following items:
❑ REPRODUCABLE PLANS 'X SPECIFICATIONS ❑ ORIGINALS
COPIES
DATE
NUMBER
DESCRIPTION / REMARKS
J► 5T
Y aTK /-!/4-L-
l Z d -3 cc -,,Al (1AA/ i SPam.
MESSAGE:
�.; 6E (Al Cof�o/� 7CD (/UTo (<'Ev1Slon/S GcJ(�&ZE,�J—( L y
IN' P2o"ESS , c/OKN lfd,3sv,.1�TH�hr«c_ G-(UCN
Yo a 4cw5c o vEr� S (a/vs or- THE w SEA T S
Z.
These are transmitted as checked below:
❑
FOR SIGNATURE APPROVAL
❑ APPROVED AS SUBMITTED
❑
RESUBMIT COPIES FOR APPROVAL
❑
FOR YOUR USE
❑ APPROVED AS NOTED
❑
SUBMIT COPIES FOR DISTRIBUTION
❑
AS REQUESTED
❑ RETURNED FOR CORRECTIONS
❑
RETURN CORRECTED PRINTS
❑
FOR REVIEW AND COMMENT
❑
❑
PRINTS RETURNED AFTER LOAN TO US
Copies to:
L- I- J t-}HNDT 604) A 6reM6�sOFrom
R aG A-r) c/-(A/1 l L- L FX ( T cr I L- )
J o N N 14 v e Sv ^j /r`S)
IF ENCLOSURES ARE NOT AS NOTED, PLEASE NOTIFY US AT ONCE.
PBPW5001 09/99 bh