CITY OF RENTON
PRECONSTRUCTION MEETING
Westview Lift Station Upgrades
WWP-27-3536
FIFTH FLOOR CONFERENCE ROOM-511-9:00 A.M.
January 27.2011
City Project Manager: John Hobson
Office: 425-430-7279
Fax: 425-430-7241
Email: jh.obson@ rentonwa.gov
City Inspector: Mark Wetherbee
Mobile 9 206-999-1829
Advanced Construction, Inc.
4640 Campus P1— Ste 150, Mukilteo, WA 98275
Project Manager: AJ Smith
Office: (425) 493-1826
FAX: (425) 49)-1827
aj smith@advancedconstructioninc.net
Project Superintendent: Zane Gardner
Cell: ( )
FAX: (425) 493-1827
zane@advancedconstructionine.net
Qwest Communications — Ken Kobes
r Melanie Wheeler
206-345-3488
206-345-4055
Fax:1-253-372-5176
Puget Sound Energy — Kathy Johnson
425-462-3381(office)
206-240-2482 cell
425-462-3355
Comcast —Bill Walker, Cell 206-255-6975
253-288-7538
253-288-7500
King Co Transp. Div — Steve Wilson
206-296-8144
206-296-8198
Metro Bus Routes — Richard Garcia
206-684-2732
206-684-2686
Renton School Dist Trans. Michael Shahan
425-204-4455
425-204-4465
Waste Management Rainier - Steve Aiton
206-505-9171
206-695-6100
INTRODUCTIONS:
SCHEDULE:
6 Estimated start date.
e Construction schedule for construction
a Work hours are weekdays, 7:00 AM to 5:00 PM. Work on Saturday by approval only and no work
will be allowed on Sundays. Any changes to work hours shall have prior approval from the City of Renton.
No work on Sundays or holidays. No equipment shall be started prior to 7:00 a.m.
C Holidays: None
0 Progress Payments: Typically once a month. When we issue the notice to proceed, we will agree on the
schedule. Quantities from inspection reports will take preceder ice. Cut off for quantities will typically be
the Friday before our Finance Cutoff Day (see finance calendar). Submittals of quantities should be by the
end of the day the Tuesday before our Finance Cutoff Day. This should give us opportunity to work out
discrepancies. If they can not be worked out prior to our cutoff day, we will use inspection reports and
work it out for the next pay estimate.
Checks are typically mailed 11 days after the Finance Cutoff Day.
WASTE MANAGEMENT
a Coordinate Garbage pickup.
PRIVATE UTILITIES
9 Private Utilities Concerns and Questions..
GENERAL:
NOTIFY FIRE AND POLICE OF THE CONSTRUCTION SCHEDULE. CALL 911 FROM A LOCAL
LAND LIi iE ONLY. FIRE DISPATCH FROM CELL PHONE: 253-852-2121.
o Overtime takes special authorization. Pay schedule is $75 per hour for overtime. The City shall cover
inspection overtime hours from 3:00 — 5:00 PM, Monday -Friday.
• Keep the streets clean. Truck washing and other measures, as approved, are required for the duration of the
project. Provide whatever measures necessary for cleanup and dust control during the job and at night. All
truck maneuvering and materials storage to be within the project area only. Right of way to remain
unobstructed when possible.
a Erosion control: Best management practices. There is both catch basins and ditches to protect.
Maintenance of erosion control systems will be monitored.
a Haul legal loads.
e Keep a set of approved City construction drawings and construction documents on -site at all times.
Contractors are advised to only use sets of drawings stamped and signed by the City of Renton for
constructing utility and transportation improvements. The approved plans do not constitute a fill and grade
permit or grant any rights to fill and/or grade outside of the right-of-way.
a All utilities must be inspected prior to backfill.
a For any field changes: If minor, submit a shop drawing or schematic through the inspector, by FAX-425-
430-7241, or by email (jhobson@ rentonwa.gov). If major, the contractors project engineer should submit
drawings and complete justification, information and calculations as applicable to the City's project
manager. The City will answer by memo or schedule a meeting within two days.
SPECIAL PROJECT CONSIDERATIONS:
a Proposed staging areas?
a Minimize construction vehicles on residential streets outside of the project area.
a Traffic Control shall be per the approved plans.
HAFile Sys\WWP - WasteWater\WWP-27-3536 Westview Lift Station Upgrades\CONSTRUCTIOWRECON-agenda-Westview.clot
r
o Access for emergency vehicles (fire, medical, police) shall be maintained at all times.
a Be careful to keep the site clean of mud and dust.
MATERIAL SUBMITTALS
o Electronic material submittals are preferable for review and approval.
CITY INSPECTION
City inspection (Mark Wetherbee)
All work to be inspected by City inspector prior to backfill. All thrust blocks must be inspected. Refer to
contract specifications for water main installation, testing, cleaning and final connection.
Pothole to verify horizontal and vertical alignment of existing pipes before installing new line.
SEWER
Scope of Work
Contractor's proposed schedule and work plan
a Final acceptance shall be after final walk through inspection, adjustment of all structures and approval of
as-builts.
H:Tile Sys\WWP - Waste Water\WWP-27-3536 Westview Lift Station Upgrades\CONSTRUCTION\PR-CON-agenda-Westview.doc
PROJECT: Westview Lift Station
w'% ') pur . �7 �.rr r.+¢'u:' ' � �A. P..76N!n""-. Trti 'C�`"�-„'•, "'�,. e?!;,":S V'.�'�F'i',T"'.tt
a.rtrw,�+,,.'1 .-, .. ' c ..r ;t� ::ws '�,r,r "Y'(.;,ri'� � •�,�.
tlrrari e ' si urG rc�lri h, W, ORGETYA . ,r UNT0;LABO,R� RAdTIS&Yzt� � s ,
�„ ? .a. , .0,1mo
OVERTIME RATE
TOTAL
F.A.
FICA, TOTAL
HOURLY FICA, SUTA, IND. Small Trans. & BASE
Prev. Wa SUTA, IND. F.A OT.
EMPLOYEE NAMES Labor Classification WAGE FRINGE FUTA INS. Tools Perdiem RATE
OT Rate FUTA INS. RATE
a upennten,_,ent „ 4 .47 + 7.0 %"3:04 + 58 52
72.71
10.52
3.04
86.2
Laborer„�
40.03
.: `:
5.79
1.A'04:..A886:
60.05
8.69
3.04
;.> ._.
.: n ..,;;
Iti
PowerEqup;Oper '.<-
49.48
,; ', ;
7.16
4.74
?
61 38
74.22
10.74
4.74
9. 0
fi "
Painter,
34.87
5.05j42°96`•
52.31
7.57
3.04
„
.9
1
—
ptt
s.
ffisi
' C�.�1,x�Si'',
_
x, r�• r.i��
-
r..
1-j
i a i
h.x, Jl.d.`
-
-
-
.l a Ji k - � , _u ip.C.. z�.Y •�.l
` - � k �'. d f
5 a
,v
I
'AXES = SS+MED+SUTA+FUTA = 14.47%
I hereby certify all wages and rates contained herein to be true and
C.;y
Signature
Contractors Project Organization and
Prepared by: Advanced Construction,
Westview Lift Station Upgrades
No. WWP-27-3536
Contact List
Inc.
Project Manager
AJ Smith
425-493-1826 main office
425-493-1827 main office fax
aismith(a�-advancedconstructioninc.net
The project manager will oversee all aspects of the project and resolve any
disputes, provide scheduling and coordinate subcontractors.
2. Superintendent
Zane Gardner
425-493-1826 main office
425-493-1827 main office fax
zane(Dadvancedconstructioninc.net
The Superintendent will be full time onsite for the day to day operations of this
project.
3. Document Control
Katy Mitrofanova
425-493-1826 main office
425-493-1827 fax
Katy(a)advancedconstructioninc.net
The Document Controller will submit all required paperwork under the
contract,
4. Controller
Linda Burkhert
425-493-1826 main office
425-493-1142 fax
linda(a?advancedconstructioninc net
The Controller is responsible for payrolls, EEO reports, invoicing, change
order reconciliation, and force account documentation.
EXECUTIVE DEPARTMENT D oCityof
J,
�G�G-� VOG�U ♦��S
M E M O R A N D U M
DATE: January 11, 2011
TO: John Hobson, PW — Utility Systems
FROM:0
1Cindy Moya, Records Management Specialist
SUBJECT: CAG-10-142 —Advanced Construction, Inc.
The attached original documents have been fully executed and are being returned to
you. Please transmit the original to the contractor and retain a copy for your file. The City
Clerk has retained an original for the file.
Thank you!
hAcitycierkArecords special i st\correspondence & memos - cindy\fully executed contract
memo.doc
PRECONSTRUCTION CONFERENCE Sign -in Sheet Q�h0�
Project Name: Westview Lift Station Upgrades
Location: City Hall, 51h Floor, Room 511
Project Manager: John Hobson, x7279 Contractor Name: Advanced Construction, Inc.
Contact Name: AJ Smith
Please print clearly
Phone Number: 425-493-1826
Name
Company
Contact Phone/E-Mail
John Hobson (project manager)
City of Renton
425-430-7279
jhobson@ren-tonwa.gov
Mark Wetherbee (inspector)
City of Renton
206-999-1829
mwetherbee@rentonwa.gov
((��
4-5
g.l
dLc, o
bc&seG Caro Ilo. covh
TYLE/2 l/(�HI TC/`f0l.�s
201, 0
v� wti i �e'tLCL ;-e � a �o //o . CO vil
�C_`/L� ��`Aj.�—w
2 �J!✓
(G1
� L A iJJit— � 1 C.Pr� Jk� Vc%ha , St7\i