memorandum
date December 7, 2009
to David Christensen, City of Renton Public Works
Lara Kammereck, Carollo Engineers
from Sara Noland and Cathie Conolly
subject Revised - East Renton Lift Station - Permitting Requirements
Introduction
............................... ......................... .............
The City of Renton Department of Public Works is analyzing a preferred route for a new gravity sewer line
crossing through future Maplewood Park in unincorporated King County adjacent to the City of Renton,
Washington. The study area for this project is a north -south corridor approximately 300 feet wide located in the
central, undeveloped portion of the park. The corridor connects an existing City of Renton pump station located
just north of the park to an existing sewer line within 148th Place SE south of the park.
ESA Adolfson identified seven palustrine forested wetlands (designated Wetlands A through G) and two streams
within the study area boundaries (see Figures la and Ib). These critical areas are discussed in detail in the East
Renton Lift Station Wetland] Stream, and Wildlife Study (ESA Adolfson, 2009).
Maplewood Park is anticipated to be transferred in ownership from King County to the City at some time in the
future. The City has requested assistance in evaluating the permitting requirements and mitigation costs
associated with disturbance of critical areas on the site (streams, wetlands, buffers, trees). The City would also
like to know how the permit requirements for the sewer line may differ depending on whether the park is within
unincorporated King County or annexed to the City of Renton.
This memo addresses streams, wetlands, and wildlife habitat only. It does not address other types of critical areas
that may be present on the site (floodplains, geologic hazards, etc.).
All of the tables and figures referenced below are attached at the end of this memo.
Project Impacts
This memo uses the two alternative sewer line routes developed by Carollo in July 2009 as the basis for the
impacts and permitting discussion (these routes are shown on Figures la and lb). Alternative I is located on the
west side of the stream and Alternative 2 on the east side. The total length of proposed pipeline within the park
property is approximately 790 linear feet for Alternative I and approximately 950 linear feet for Alternative 2.
East Renton Lift Station - Pennitting Requirements
December 7, 2009
Page 2
The areas of impact to streams, wetlands, and buffers were estimated from the alternative route maps provided by
Carollo Engineers (dated July 24, 2009). The area of construction disturbance for the pipeline is assumed to be a
20-foot-wide corridor based on discussion with the City.
Alterative 1, on the west side of the stream, would require one stream crossing and would avoid wetlands.
Alternative 2, on the east side of the stream, would cross one wetland and avoid the stream. Both alternatives
would cross stream/wetland buffers. The area of buffer impact would be substantially greater under County
ownership because of the wider buffers specified in the King County critical areas ordinance (Table 1).
Table 2 lists the estimated impact area quantities for each route alternative and for each jurisdiction. The impact
areas discussed are for a new pipeline only; the City does not anticipate the need for a new access road to the new
pipeline.
Permitting Requirements
Table 1 lists and compares the City and County permitting requirements related to streams, wetlands, and
vegetation specific to the study area. The study area does not contain the types of wildlife habitats that are
regulated by either jurisdiction.
Please note that the U.S. Army Corps of Engineers, Washington State Department of Ecology, and Washington
Department of Fish and Wildlife also regulate alteration of streams or wetlands. The state and federal
requirements are described in Section 6 of the East Renton Lift Station Wetland, Stream, and Wildlife Study
(ESA Adolfson, 2009). These other requirements remain similar tinder either Renton or King County ownership
of the site.
King County has recently changed its approach to pernutting for utilities. The type of pennit required depends on
whether the project meets conditions for new utility corridors within critical areas listed in King County Code
(KCC) 21A.24.045(D)(34)(b). This portion of the code is provided for reference in Attachment A. If all of the
conditions are met to the maximum extent practical, then the County will process the application through a
Clearing and Grading Pennit. If these conditions are not met to the maximum extent practical, then a Critical
Areas Linear Alteration Exception process would be required (KCC 2 1 A.24.070(A)(1)).
For purposes of this memo, we have assumed that the County process would be a Clearing and Grading pennit.
This is different than the City permit process, which would require obtaining variances for reduction of standard
buffers and other impacts (see Table 1).
Permitting Costs
Table 3 compares the estimated pennit application fees for the City of Renton and King County. These costs
include only those local pen -nits related to critical areas. State and federal pennit acquisition costs are not
included, as they may be required and would likely be similar regardless of the local jurisdiction.
The exact costs for pennit application and review are difficult to determine at this stage of the project. Some
differences between City and County fees are apparent. For example, the City does not charge a fee for pre -
application meetings, while King County charges an hourly rate for staff time. Preparing a critical areas
mitigation plan will likely also be more expensive for the County because of the County's greater mitigation
ratios and wider buffers (resulting in a larger area of mitigation required).
East Renton Lift Station - Permitting Requirements
December 7, 2009
Page 3
Tile total costs for City and County staff to process the permit applications are unknown because they depend on
the details of the project, the amount of agency staff time required for review, the number of application revisions
and rounds of review, and third -party consultant review fees.
Mitigation Construction Costs
Table 4 presents the approximate costs of constricting and installing mitigation for critical areas impacts. These
costs are preliminary and have been developed for planning purposes only.
Even though the pipeline would be buried, backfilled, and the construction area revegetated following
construction, the regulatory agencies will likely consider the construction area to be permanently impacted at
some level. Typically, trees cannot be planted over pipelines, and so the character of the pipeline corridor would
change from the current forested condition to a shrub/herbaceous community. This change in vegetation
constitutes a change in the functions of the affected areas that would be considered a permanent impact.
The following assumptions were used to develop the mitigation cost estimates shown in Table 4:
• Impacts to critical areas would be as listed in Table 2. The ntigation ratios in Table I would be applied
where appropriate.
• All mitigation would occur on -site.
• We have assumed the pipeline would be trenched through Wetland A (Alternative 2).
• We have assumed that the stream crossing will be open -cut.
• Costs for earthwork are not included in the estimates.
• We have assumed zero (0%) inflation for costs in 2010, due to the current economy.
• Additional specific assumptions used to develop costs for each type of mitigation or restoration are
presented in Table 4.
As shown in Table 4, mitigation construction costs would generally be higher under King County ownership.
This is a result of larger stream and wetland buffers, resulting in greater areas of buffer impact; higher mitigation
ratios for wetland impacts; and the requirement to provide additional mitigation for buffer impacts.
Cost Summary and Comparison
Tables 5a and 5b summarize the range of total critical areas permitting and mitigation costs for each jurisdiction
and alternative. Overall, Alternative 2 is likely to be more expensive to permit and Mitigate because it includes
wetland impacts and mitigation. Costs are likely to be higher for both alternatives under King County ownership.
As stated earlier, this memo presents only estimated costs. Cost estimates can be refined as more detailed
information about the project is obtained. For example, once the City selects a route alternative, the construction
footprint can be refined and surveyed, and the areas of critical area impact can be precisely determined (e.g., using
ALItoCAD to overlay the constriction footprint over the critical area boundaries).
As discussed above, King County would require significantly more mitigation for wetland impacts than the City,
and so the determination of park ownership is also needed to determine the area of mitigation required. Once
East Renton Lift Station - Permitting Requirements
December 7, 2009
Page 4
these decisions are made, a biologist would need to evaluate the potential wetland rnitigation areas shown on
Figures la and lb in more detail in order to prepare mitigation designs and planting plans. These designs and
plans would specify the amount of earthwork needed to create new wetland area, soil amendment quantities, plant
species and quantities, etc.
Limitations
Within the limitations of schedule, budget, and scope -of -work, we warrant that this study was conducted in
accordance with generally accepted enviromnental science practices, including the technical guidelines and
criteria in effect at the tirne this study was performed. The results and conclusions of this report represent the
authors' best professional judgment, based upon information provided by the project proponent in addition to that
obtained during the course of this study. No other warranty, expressed or implied, is made.
Thank you for the opportunity to provide this information to the City. If you have any questions, please contact
Sara Noland or Cathie Conolly at (206) 789-9658.
East Renton Lift Station - Pernnitting Requirements
December 7, 2009
Page 5
Table 1. East Renton Lift Station — Environmental Permit Matrix
City of Renton
King County.-
Code Section:
Code Section:
RMC 4-3-050(L) - streams
KCC 21A.04.045 — allowed alterations
RMC 4-3-050(M) — wetlands
KCC 21A.24.355, 358 - streams
RMC 4-4-130 — tree removal
KCC 21A.24.318, 325, 340 — wetlands
KCC 16.82 — tree removal
Wetland Classification: Category 3
Wetland Classification: Category II
Wetland Buffers: 25 feet
Wetland Buffers: 125 feet
Stream Classification:
Stream Classification:
Class 3 (main channel)
Type F (main channel)
Class 4 (tributary)
Type N (tributary)
Stream Buffers:
Stream Buffers:
75 feet (Class 3)
115 feet (Type F)
35 feet (Class 4)
65 feet (Type N)
Type of Permit:
Type of Permit:
• Variance for reduction of standard buffers,
If project meets all the requirements of KCC 21 A.24.045
wetland/stream impacts, tree removal in critical
(alteration conditions for new utility corridors), it will be
areas.
processed through a Clearing and Grading Pernnit.
• SEPA review.
SEPA and critical areas review would occur as part of the
• Clearing and grading permit (obtained
Clearing and Grading Permit application.
following land use approvals).
If project does not meet all the above criteria, then a
Critical Areas Linear Alteration Exception would be
required.
East Renton Lift Station - Pennitting Requirements
December 7, 2009
Page 6
IC;
ify of Renton`
King County
Submittal Requirements:
Submttal Requirements (assumes project is processed
through Clearing and Gradingpennit):
• Pre -application meeting
• Variance form
Pre -application meeting
• Title report
Certification of applicant status form
• Land Use permit master form
. Affadavit of application
• Project narrative
• Clearing and Grading Permit application worksheet
• Justification for variance request
0 Fee worksheet
• Neighborhood detail map
0 Site plans
• Site plan
0 Legal description
• Flood hazard data
0 Grading plan
• Utilities plan
0 Erosion control in accordance with King County Surface
• Geotech report
Water Design Manual
• Grading plan
0 Plan to retain soil moisture capacity
• SEPA Checklist
• SEPA Checklist
• Critical Areas Study
0 Geotechnical Study
• Critical Areas Mitigation Plan
0 Critical Areas Study
• Tree Protection and Replacement Plan
0 Mitigation Plan
Wetland Mitigation Ratios:
Wetland Mitigation Ratios:
• Restoration or creation - 1.5:1
0 Creation - 3:1
• Combination - 1:1 restoration or creation plus
0 Combination - 1:1 creation plus 4:1 enhancement
1:1 enhancement
0 Rehabilitation - 8:1
• Enhancement only — not typically allowed
0 Enhancement only - 12: 1
Buffer Mitigation:
Buffer Mitigation:
Restore disturbed buffers with native vegetation.
Restore disturbed buffers with native vegetation.
Provide an additional area of compensatory buffer mitigation
(1.5:1 mitigation ratio assumed; see Table 4).
Review Timeline:
Review Timeline:
Minimum 12 weeks (approximately three months)
Minimum 90 days (approximately three months) following
following receipt of complete application.
receipt of complete application.
East Renton Lift Station - Permitting Requirements
December 7, 2009
Page 7
Table 2. Estimated Impact Areas
Impacted ',
CityO Renton".
King County
Resource
Stream and
Alternative 1:
Alternative 1:
wetland buffers
. Stream buffer: 75 if on each side of
• Stream buffer: 115 If on each side of stream x
stream x 20 ft wide = 3,000 sf
20 ft wide = 4,600 sf
• Wetland E buffer: Contained within
• Wetland buffers: 555 if x 20 ft wide =
stream buffer impact area
11,100 sf
• Wetland C buffer: 50 if along west
Total Alt 1 buffer impact: 15,700 sf
side of wetland x 20 ft wide = 1,000 sf
Total Alt 1 buffer impact: 4,000 sf
Alternative 2:
Alternative 2:
• Wetland A buffer: 25 if on each side
Wetland buffers: 8501f x 20 ft wide =
of wetland x 20 ft wide = 1,000 sf
17,000 sf
Total Alt 2 buffer impact: 1,000 sf
Total Alt 2 buffer impact: 17,000 sf
Stream chamiel
Alterative 1:
Alternative 1:
• 20 if (width of pipeline corridor)
• 20 if (width of pipeline corridor)
Alternative 2:
Alternative 2:
None
None
Wetlands
Alternative 1:
Alternative 1:
None (assumes pipeline can be shifted
None (assumes pipeline can be shifted west to
west to avoid Wetland C)
avoid Wetland C)
Alternative 2:
Alternative 2:
Wetland A: 1001f x 20 ft wide = 2,000 sf
Wetland A: 1001f x 20 ft wide = 2,000 sf
Upland areas
Alternative 1:
None (all uplands are within buffers)
outside of
585 if x 20 ft wide = 11,700 sf
buffers
Alternative 2:
800 If x 20 ft wide = 16,000 sf
East Renton Lift Station - Permitting Requirements
December 7, 2009
Paue 8
Table 3. Estimated Local Permit Fees*
Type of Fee
City of Renton,
King County
Pre -application meeting
Free
To be determined by County after
meeting is scheduled and deposit
collected. County staff time is
billed at $140/hour.
SEPA review
$1,000
Part of Clearing and Grading Permit
review
Critical areas review
100% of contractor's fee for
Part of Clearing and Grading Permit
independent third -party review
review
(Otak)
Variance or exception
$1,200 for each type of variance
Assumed not to be required
(e.g., buffers, tree removal, etc.)
Clearing and Grading Permit
Negligible; counter pernit
Grading Plan Review:
Base fee: $2,173 for less than
1 acre disturbed
Hourly fee ($140) after 17
hours
Grading Site Inspection:
Base fee: $560 for less than 5
acres disturbed
Hourly fee ($140) after 4 hours
Prepare wetland/buffer
Varies depending on selected
Cost likely to be higher than for
mitigation plan
alternative and contractor fees.
City due to larger mitigation ratios
Would be higher for Alternative 2
and wider buffers.
due to need for wetland mitigation.
* Does not include state or federal permits.
Gall RCII(011 Li I I Sid I I Oil - Permitting Requirements
Dcccmhcr 7, 2009
Pagc 9
Table 4 Fsthwited 11n4imi-iry Mitiviitinii Casts
Activity City of Renton King County Comments/Assumptions
Restoration ol Xreas h" .n
slicaill and wellaild huff cl S
Allemative L
Alternative I
Per unit cost assumes main restoration effort is to reseed and install native shrubs ill
Impact area: 4,000 st'
Impact area: 15,700 sf
disturbed areas.
Restoration area: 4,000 sl
ResIoTalion area: 15,700 sf
Restoring SlIffaCe Soils to 1113tCh PIC-ColISMICtioll grades is aSSLIIIICCI to occur as part
Restoration unit cost S3/st'
Restoration unit cost: $3/st'
of'construction. Costs for earthwork arc not included in the per unit cost Shown here.
Total restoration estiniale: $12,000
Total restoration estimate: $47,100
Allemalive 2:
AIICTIIIli\'c 2:
bIlpqct area: 1000 sf
Impact area: 17,000 sf
Restoration area: 1,000 sf
Restoration area: 17,000 sf
Restoration unit cost: S3/sf
Restoration unit cost: $31sf
Tidal restoration estimate: $3,000
Total restoration estimate: $5 1,000
Stream channel
Allcinalive 1:
AIteTIIaIlVC I
Per unit cost based on recent pjqjccI along Swamp Crock in Kcimiote involving
Impact area: 20 11'
Impact area: 20 If
restoration ot'2,000 If of stream banks.
Restoration area: 20 11
Restoration area: 20 If
Restoring surface soils to match pre-constniction grades is assumed to occur as pait
Restoration unit cost: $160/11
Restoration unit cost $160/11'
of construction. Costs for e,-Iftll\%,oik are not included in the per unit cost shown licie.
Total restoration estimate: S3,200
Total restoration estimate: $3,200
Alternative 2:
Alleinalive 2*
Not applicable no stream crossing).
Not applicable (no stream crossing).
Wetlands
Alkemative L
Alternative I
Restoration of'welland following benching is issunied to jcqkme both installation of
Not applicable (no wetland crossing).
Not applicable (no wetland crossing).
native shrubs/herbs and either soil amendments or stockpiling and ieplacunmit of
native topsoil.
Allemalive 2
Alternative 2
Per unit costs are assumed to be intcinlediatc between wetland enhancement (planting
Impact area: 2,000 sf
Impact area: 2,000 sf
only) and wetland creation (settle earthwork).
Restoration area: 2,000 sf
Restoration area: 2,000 sf
We Ilierefore used the middle of the collipells"Itoly wetland mitigation unit cost range
Restoration unit cost: $41st'
Restoration unit cost: S4/sf
($2 - $6 Per sf) described in the Compensatory Mitigation section of this (able below.
Total lestolotioll estimate: S8,000
"Folal restoration estimate: $8,000
Upland areas- Outside of bill'I cis
Alionative I
Not applicable fall uplands arc contained within buffets)
Cost to restore upland areas located outside of buffets (assuming City of'Renton
Impact area: 11 ,700 sf
ownership) was assumed to be less than that to restore regulated buffer areas.
Restoration area: 11,700 sf
This was based on the assumption that restoration of non -buffer areas could be less
Restoration unit cost: S2/sf
Intensive than restoration within buffers. For example, both buffer and noll-bliffel
Total iestoialion estimate: S23,400
areas- would be ievcLictated with native shrubs, bill the dclisilv and diversity (,t,shrub
plantings could be less within non -buffer areas.
Alminative 2
Impact area: 16,000 sf
Restoration area: 16'000sf
Restoration unit cost $2/sf
Total restoration estimate: S32,000
E;lsl Renton Lifl Station - 11crnlitting Requirements
December 7, 2009
Pagc 10
Activity City of Renton Ring County Comments/Assumptions
"Cum pensafun Miligalion ."
\>,%edml.l mitigation (combination
Alternative I:
Alternative I:
Per unit costs presented as a range because there are several factors that alTeci the
of creation and enhanecnpent at
Not applicable (n) direct pvcthuld
Not applicable (no direct wetland impact).
level of effort needed (e.g., amount of earthwork, need for soil anlendnlenis, etc.).
ratios listed in Table I )
impact).
The low end per unit cost is based on ❑ recent wetland miligaliou project that ESA
Note: This is mitigation outside
Adolfson designed fix Picrcc County Public works and which was then cnnsinlcted
of the wetland area dilocth,
Altcrnalke 2:
Allcinative 2:
in April 2008. This project included wetland creation and weilenl.11NO er
Impacted by consinlcooll.
Impact area: 2,000 sf
Impact area: 2,000 sf
enhancement elements. Costs included grading, erosion coulrol nlcesures. plants.
Potential compensatory
Mitigation ratio: 2:1
Mitigation ratio: 5:1
seeding, mulch, compost, and wildlife structures (logs and snags).
miliglltion riles ;Ire shown oil
Mitigation area: 4,000 sf
Mitigation area: 10,000 st
• The high end unit cost is based on actual mitigation costs 1111a City of Everett
Fieures la and 11).
Mitigation unit cost: $2/sf- $6/sf
Mitigation unit cost: $2/sf- $6/st'
mitigation project in 2008. ]'he high end cost estimate assumes more grading and
Total mitigation estimate
"total mitigation estimate:
caillmoik and a larger requirement for soil anlendnlent.
S8,000 - $24,000
$20,000 - $60,000
Buffer enhancement
Not required.
Alternative I :
King Counly indicated that compensatory mitigation may be required for permanent
Impact area: 15,700 sl
changes to vegetation commtwitics in buflcr areas (foresicd to shrub). "fhcy
Note: This is outside
Mitigation ratio: 1.5: 1
suggested using the vegetation conversion table in KCC 21 A.24.340 as a wuy to
of the buflcr nrca directly
len kill
Mitiga0on arch: 23,550 sf
estimate potential ratio requirements.
Mitigation unit cost: $3/sf'
• Miligation ratio of 1.5:1 represents the lower range of nitios ill the KCC vegeln0on
impacted by construction.
Total m,ugauon esllmale: $70,650
conversion table.
Potential compensatory
• Acloal mitigation ratio for buffer impacts would be dctunlined during puma review.
mitigation riles are shown on
Alternative 2:.
Per unit cost assumes main effort is to remove invasive vegela ion, reseed and install
1-Igtll"L`s I and1b
Impact at ea: 17,000 st
native shrubs.
Mitigation ratio: 1.5:1
Mitigation nrca: 25,500
Mitigation unit cost: $3/sf
Total mitigation estimate: $76500
Additional Costs 4'" � ..
- .ter
Financial guarantees
None required.
City would provide a Public Agency Security Agreement to guarantee
completion of mitigatiou. A bond number would be assigned, but no
1'in;u16i 11 de posit re tired.
Monilonl -
Alternative I :
Alternative I:
Costs are presented as rmges clue to variability depending on type and extent of
Construction monitoring:
Constluclion monitoring:
mitigation. .
S3,000 - S5,000
S3,000 - $5,000
Construction monitoring costs assumes biologist will be on-sllc dui up to 40 hours
during pipeline insudlalion.
As -built or rea,rd drawing:
As -bunt or record drapving,
Cost assumes three years of post -construction monitoring; Kill', Counly Imly
S3,000 - S5,000
S3.000 - S5,000
require up to five years depending on the project.
Annual Il lomtomo,,:
Annual monito 111g:
• Costs I'm post-consti"llction 111011110l'illg assumed to be g1'l'atei lot" Alll'i'1lative 2 dale to
S3,000 - $5,000 per year x 3 years =
S4,500 - $7,000 per year x 3 years = S13,500 - $22.500
requirement for compensatory wetland mitigation.
S9,000 - S15,000
Allclualivc 2:
Post -construction monitoring costs under King County ownership ore assumed to be
Construction nloniloring:
1.5 limes higher than Those under Renton ownuship due to larger Counly mitigation
Altumrtive 2:
$3,000 - $5,000
area requirements.
Clm.truction monitoring:
As -built of record drawing:
$3,000 - S5,000
$4,500 - $7,000
As -built or record drawing:
Annual monitoring:
S3,000 - $5,000
$6,000 - $10,500 per year x 3 years = $1 R 000 - $31,500
Anmlal numiloring:
$4 000 - $7,000 per year x 3 years =
$12,000 - S21,000
East Renton Lift Station - Permitting Requirements
December 7, 2009
Page I 1
Table 5a. City of Renton - Summary of Estimated Permitting and Mitigation Costs
item
Alternative1
` 'Alternative 2
Preparation of critical
Variable
Variable; likely higher than for
areas mitigation plan
Alternative 1 due to wetland
mitigation requirement
Agency permit review
Minimum $2,200 plus staff fees for
Similar to Alternative I but
fees
additional variances and third -party
potentially more complex (with
review of critical areas mitigation
higher review fees) due to wetland
plan
impacts and mitigation
Restoration of areas
$38,600
$43,000
disturbed during
construction (stream,
wetland, buffers, non -
buffer uplands)
Compensatory wetland
No wetland impacts
$8,000 - $24,000
mitigation
Compensatory buffer
Not required by City
Not required by City
mitigation
Monitorimcy
$15,000 - $25,000
$18,000 - $31,000
Table 5b. King County - Summary of Estimated Permitting and Mitigation Costs
Item
Alternative:l
Alternative 2
Preparation of critical
Variable
Variable; likely higher than for
areas m iticyation plan
y
Alternative 1 due to wetland
mitigation requirement
Agency pennit review
Minimum $2,700 plus hourly staff
Similar to Alternative 1 but
fees
fees for pre-app meeting, and hourly
potentially more complex (with
fees for grading plan review and site
higher review fees) due to wetland
inspection that exceed base fee
impacts and mitigation
Restoration of areas
$50,300
$59,000
disturbed during
construction (stream,
wetland, buffers, non -
buffer uplands)
Compensatory wetland
No wetland impacts
$20,000 - $60,000
mitigation
Compensatory buffer
$70,650
$76,500
mitigation
Monitoring
$19,500 - $32,500
S25,500 - S43,500
East Renton Lift Station - Permitting Requirements
December 7, 2009
Pave 12
Attachment A. King County Clearing and Grading Permit Requirements
iC
East Renton Lift Station - Permitting Requirements
December 7, 2009
Page 13
KCC 21A.04.045.D.34.
Limited to the pipelines, cables, wires and support structures of utility facilities within utility corridors
if:
a. there is no alternative location with less adverse impact on the critical area and critical area buffer;
b. new utility corridors meet the all of the following to the maximum extent practical:
(1) are not located over habitat used for salmonid rearing or spawning or by a species listed as
endangered or threatened by the state or federal government unless the department determines that there
is no other feasible crossing site;
(2) the mean annual flow rate is less than twenty cubic feet per second; and
(3) paralleling the channel or following a down -valley route near the channel is avoided;
c. to the maximum extent practical utility corridors are located so that:
(1) the width is the minimized;
(2) the removal of trees greater than twelve inches diameter at breast height is minimized;
(3) an additional, contiguous and undisturbed critical area buffer, equal in area to the disturbed
critical area buffer area including any allowed maintenance roads, is provided to protect the critical area;
d. to the maximum extent practical, access for maintenance is at limited access points into the
critical area buffer rather than by a parallel maintenance road. If a parallel maintenance road is
necessary the following standards are met:
(1) to the maxinu.1m extent practical the width of the maintenance road is minimized and in
no event greater than fifteen feet; and
(2) the location of the maintenance road is contiguous to the utility corridor on the side of the
utility corridor farthest from the critical area;
e. the utility corridor or facility will not adversely impact the overall critical area hydrology or diminish
flood storage capacity;
f. the construction occurs during approved periods for instream work;
g. the utility corridor serves multiple purposes and properties to the maximum extent practical;
h. bridges or other construction techniques that do not disturb the critical areas are used to the
maximum extent practical;
i. bored, drilled or other trenchless crossing is laterally constructed at least four feet below the
maximum depth of scour for the base flood;
J. bridge piers or abutments for bridge crossing are not placed within the FEMA tloodway or the
ordinary high water mark;
k. open trenching is only used during low flow periods or only within aquatic areas when they are dry.
The department may approve open trenching of type S or F aquatic areas only if there is not a feasible
alternative and equivalent or greater environmental protection can be achieved; and
1. minor communication facilities may collocate on existing utility facilities if:
(1) no new transmission support structure is required; and
(2) equipment cabinets are located on the transmission support structure.
13
-
LEGEND
FsS-1 .ETERR,T,E21-1—�FE
.1
K1NG_C.OV,, REQUIREMENTS.
RESOURCE ___ .._CLAS51FICATION....__BUFFERS
t
WETLANDS A - G CATEGORY II
125 FEET
I
MAIN STREAM TYPE F
115 FEET
I
TRIBUTARY TYPE N
65 FEET
AI_TE_N�T1vES,
'STREAM B-UHER VIOLATED.ALONG MAJORITY
3 r
9F RQUTE THROUGH MAPLEWOQD PARK FOR
r BOTH ALTERNATIVES
4i r
D1110—
k—FY
aWETthYDa CN1.7
EAjT, GUTS JC Of
UR'hY RI%I4D 11
}
E u
l
MAPLEWOOD PARK
BOUNDARY
.sl /`v1 T
FIGURE 1A
EAST RENTON SEWER ROUTE ALTERNATIVES
KING COUNTY MITIGATION REQUIREMENTS
,r o 25 50 00 2006 WASTEWATER LIFT STATION PRE -DESIGN
I CITY OF RENTON
N s e Feel
C \•.wai'sl .ryrc -Ta4� •drtn]filOPF GU4F. t ft 2 )-]•fM OB 5Um .Sm•' x4EF5'. F n r_.W vp 'm.hrs twm ls,•er
1
MAPIEWOOD PARK
BOUNDARY
3
-- - —. FIGURE I
EAST RENTON SEWER ROUTE ALTERNATIVES
CITY OF RENTON MITIGATION REQUIREMENTS
,1, 0 25 so loo 2009 WASTEWATER LIFT STATION PRE -DESIGN
CITY OF RENTON
N . ._...._.. S-le In F *
G1 .. wwv:�ynj selsE�rrsTE]OTFIGUFEi4tT-IaM OE 15+u11 IREFS'
5309 Shilshole Avenue NW +rmw.adolfson.com
ESAAdolfsori Suite 200
Seattle, WA 98107
206.789.9658 phone
206,789.9684 fax
memorandum
date November 6, 2009
to David Christensen, City of Renton Public Works
Lara Kammereck, Carollo Engineers
from Sara Noland and Cathie Conolly
subject DRAFT East Renton Lift Station - Permitting Requirements
Introduction
The City of Rent artmCofPublic Works is analyzing a preferred route for a new gravity sewer line
crossing through a lewoo nton, Washington. The study area for this project is a north -south
corridor approximately 300 feet wide located in the central, undeveloped portion of the park. The corridor
connects an existing City of Renton pump station located just north of the park to an existing sewer line within
148th Place SE south of the park. This memo uses the two alternative sewer line routes_develoved by Carollo in
A*t�July 2009 as the basis for the permitting discussion (these routes are shown on a map e..ed
Fi arras 1 and 24. Alternative 1 is located on
the west side of the stream and Alternative 2 on the east side.
ESA Adolfson identified seven palustrine forested wetlands (designated Wetlands A through G) and two streams
within the study area boundaries. These critical areas are discussed in detail in the East Renton Lift Station
Wetland, Stream, and Wildlife Study (ESA Adolfson, 2009).
Maplewood Park is anticipated to be transferred in ownership from King County to the City at some time in the
future. The City has requested assistance in evaluating the permitting requirements and mitigation costs
associated with disturbance of critical areas on the site (streams, wetlands, buffers, trees). The City would also
lik to know how the permit requirements for he sewer line may differ depending on whether the park isw*der—
t(� t�slriTrof King County or the Cityenton.
This memo addresses streams, wetlands, and wildlife habitat only. It does not address other types of critical areas
that may be present on the site (floodplains, geologic hazards, etc.).
Permitting Requirements
The attached matrix (Table 1) lists and compares the City and County permitting requirements related to streams,
wetlands, and vegetation specific to the study area. The study area does not contain types of wildlife habitats that
are regulated by either jurisdiction.
COMMENT: Should the TM reference who ESA met with from the City and County, etc? 9D
DRAFT East Renton Lift Station - Permitting Requirements
November 6, 2009
Page 2
Please note that the U.S. Army Corps of Engineers, Washington State Department of Ecology, and Washington
Department of Fish and Wildlife also regulate alteration of streams or wetlands. The state and federal
requirements are described in Section 6 of the East Renton Lift Station Wetland, Stream, and Wildlife Study
(ESA Adolfson, 2009).
Permitting and Mitigation Costs
The following table (Table 2) compares the estimated permit fees for the City of Renton and King County. These
costs include only those local permits related to critical areas. State and federal permits acquisition costs would
Mare not included, as they maybe required sreaardless of the local jurisdiction.
Table 2. Estimated Permit Fees
Type of Fee
City of Renton
King County
Pre -application meeting
Free
Information mtg - Free
Pre-app meeting - $1,500 (est.)
App review mtg - $3,000 (est.)
SEPA review
$1,000
Hourly fee
Critical areas revie�
100% of contractor's fee for
To be determined
independent third -party review
(Otak)
Variance or exception
$1,200 for each type of variance
To be determined
(e.g., buffers, tree removal, etc.)
'
Table 3 below presents the approximate costs of mitigation for critical areas impacts. These costs are preliminary
and have been developed for planning purposes only. The following assumptions were used to develop these
estimates:
• Impact areas were estimated from the June 2009 alternative route maps provided by Carollo Engineers
overlaid on the wetland, stream, and buffer map developed by ESA Adolfson. The area of construction
disturbance for the pipeline is assumed to be a 20-foot-wide corridor based on discussion with the City.
• Impact areas are for the new pipeline only. [question for City and Carollo: would any access roads be
required? If so please provide approximate locations and areas so we can add them to the im act areas
and mitigation costs.] DAVE - We do not anticipate an access road, please confirm.e l' d r `Ed �
• All mitigation would occur on -site.
• Wetland mitigation per unit costs are presented as a range because there are several factors that affect the
level of effort needed (e.g., amount of earthwork, need for soil amendments, etc.). The low end per unit
cost shown in the table is based on a recent wetland mitigation project that ESA Adolfson designed for
Pierce County Public Works and which was then constructed in April 2008. This project included wetland
creation and wetland/buffer enhancement elements. The per unit costs for that project included grading,
erosion control measures, plants, seeding, mulch, compost, and wildlife structures (logs and snags). The
high end unit cost is based on actual mitigation costs that we developed for a City of Everett mitigation
project in 2008. The high end cost estimate assumes more grading and earthwork and a larger
requirement for soil amendment. COMMENT: Since these are 2008 projects, were the cost escalated to
?009 dollars?
2
DRAFT East Renton Lift Station - Permitting Requirements
November 6, 2009 W' " h�
Page 3 v {�el,�X
�
����4
• Buffer mitigation and stream mitigation are assumed to consist of restorin reas that are disturbed durinr
construction. Additional mitigation measures that could be proposed as rt of the project mitigation plan
are not included. COMMENT: What additional measures are missing?
• We have assumed the pipeline would be trenched through Wetland A (Alternative 2). The cost estimate
includes mitigation only for the direct impacts of trenching (estimated at 200 square feet), at the ratios
required by the City and County. Additional indirect wetland impacts may need to be mitigated in areas
where the pipeline is located inside the standard wetland buffers (e.g., where the pipeline crosses between
Wetlands A and B).
• Costs are for construction of mitigation areas only and do not include permitting costs or the fees
associated with mitigation design. COMMENT: Are the pennitting and design costs substantially
different for each alternative?
Table 3. Estimated Preliminary Mitigation Costs
Type of Mitigation
City of Renton
King County
Buffer restoration
Alternative 1:
Alternative 1:
(native shrubs)
Impact area: 7,000 sf
Impact area: 17,000 sf
Mitigation area: 7,000 sf
Mitigation area: 17,000 sf
Mitigation unit cost: $3/sf
Mitigation unit cost: $3/sf
Total mitigation estimate: $21,000
Total mitigation estimate: $51,000
1
Alternative 2:
Alternative 2:
Impact area: 3,000 sf
Impact area: 19,000 sf
Mitigation area: 3,000 sf
Mitigation area: 19,000 sf
Mitigation unit cost: $3/sf
Mitigation unit cost: $3/sf
Total mitigation estimate: $9,000
Total mitigation estimate: $57,000
Wetland mitigation
Alternative 1:
Alternative 1:
(combination of creation and
Not applicable (no direct wetland
Not applicable (no direct wetland
enhancement at ratios listed in
impact).
impact).
attached matrix)
,P /
Alternative 2:
Alternative 2:
�y
Impact area: 200 sf
Impact area: 200 sf
Mitigation area: 400 sf
Mitigation unit cost: $2/sf - $6/sf
Mitigation area: 1,000 sf
Mitigation unit cost: $2/sf - $6/sf
Total mitigation estimate:
Total mitigation estimate:
$800 - $2,400
$2,000 - $6,000
DRAFT East Renton Lift Station - Permitting Requirements
November 6, 2009
Page 4
Type of Mitigation
City of Renton
King County
Stream mitigation (restoration
Alternative 1:
Alternative 1:
of disturbed stream channel)
Impact area: 100 sf
Impact area: 100 sf
/
Mitigation area: 100 sf
Mitigation area: 100 sf
V\Ikb,O
Mitigation unit cost:
Total mitigation estimate:
Mitigation unit cost:
Total mitigation estimate:
Alternative 2:
Alternative 2:
Not applicable (no stream crossing).
Not applicable (no stream crossing).
Restoration of upland areas
Alternative 1:
Not applicable (all uplands are
outside of buffers
Impact area:
contained within buffers)
Mitigation area:
Mitigation unit cost:
Total mitigation estimate:
Alternative 2:
Impact area:
Mitigation area:
Mitigation unit cost:
Total mitigation estimate:
[question for City: what type of
D
vegetation would you typically use
over a pipeline? Shrubs would be
ideal but more expensive than grass.
4
Please advise and we will fill in
costs. City will likely require some
�% ✓ h
J`
tree replacement — could be outside
Gf/
of pipeline corridor.
v
�
COMMENT: Include a summary table of the estimated total range of mitigation costs for both
alternatives for both iurisdictions. It will allow for easier evaluation.
The costs provided above are for construction and installation of mitigation only. The following items are
typically required as part of compensatory mitigation for critical area impacts but are not included in the above
cost estimates:
• Financial guarantees (surety set -asides or bonds);,7�1
1
• Land acquisition; //
• Mitigation plan design; 1A14j,- /r- file"
• Construction monitoring; It
• Restoration of temporarily disturbed areas; t
• Preparation of as -built (record drawing) following installation of mitigation; and /I
4
DRAFT East Renton Lift Station - Permitting Requirements
November 6, 2009
Page 5
• Annual or twice -annual site maintenance and monitoring (five years). //
Mitigation cost estimates can be refined as more detailed information about the site and project is obtained.
COMMENT: Please clarify. what additional data is needed to refine the costs?
Limitations
Within the limitations of schedule, budget, and scope -of -work, we warrant that this studyw was conducted in
accordance with generally accepted environmental science practices, including the technical guidelines and
criteria in effect at the time this study was performed. The results and conclusfonsTof this'report represent the
authors' best professional judgment, based upon information provided by the project proponent in addition to that
obtained during the course of this study. No other warranty, expressed or implied, is.;made.
Thank you for the opportunity to provide this infori
Sara Noland or Cathie Conolly at (206) 789-9658.
ity. If you havc`any questions, please contact
DRAFT East Renton Lift Station - Permitting Requirements
November 6, 2009
Page 6
Table 1. East Renton Lift Station — Environmental Permit Matrix
City of Renton
King County
Code Section:
Code Section:
RMC 4-3-050(L) - streams
KCC 21 A.24.355, 358 - streams
RMC 4-3-050(M) — wetlands
KCC 21 A.24.318, 325, 340 — wetlands
RMC 4-4-130 — tree removal
'KCC 16.82 — tree removal
Wetland Classification: Category
3
��
y,
Wetland Classification: Category II
Wetland Buffers: 25 feet
Wetland Buffers: 125 feet
Stream Classification:
Stream Classification:
Class 3 (main channel)
�;„�
s
Type F (main channel)
Class 4 (tributary)
Type N (tributary)
..:
Stream Buffers:
CStream
Buffers:
75 feet (Class 3)
1 15 feet (Type F)
35 feet (Class 4)f,
65 feet (Type N)
Type of Permit:
Type of Permit:
1
• Variance for reduction of standard
buffers wetland/stream
Critical Areas Linear Alteration Exception from standard
impacts, tree removal in critical areas
buffer requirements and/or for wetland/stream impacts.
• SEPA review.F
SEPA review.
3 vi��,da,t
• Clearing and grading permit (obtained following land use
Clearing and grading permit.
approvals).
DRAFT East Renton Lift Station - Permitting Requirements
November 6, 2009
Page 7
Table 1. East Renton Lift Station — Environmental Permit Matrix
City of Renton
Submittal Requirements:
• Pre -application meeting
• Variance form
• Title report
• Land Use permit master form
• Project narrative
• Justification for variance request
• Neighborhood detail map
• Site plan
• Flood hazard data
c
• Utilities plan
s
• Geotech report
�
6P
f
• Grading plan
Y
• SEPA Checklist
• Critical Areas Study,
• Critical Areas Mati itigon�Plan.
a3
• Tree Protection aana Reolaeemeht P
King County
Submittal Requirements:
• Informational meeting
• Pre-application/feasibility meeting
Application review meeting •
Critical Areas Linear Alteration Exception form
:•' Land Use permit application form
• Legal description
Assessor's maps
Site plan
• Water and sewer availability certificates
• SEPA Checklist
• Affadavit of critical areas compliance
• Applicant legal status form
• Copies of variance decisions
• Fire district receipt
• Proof of legal lot status
• Critical Areas Study
• Mitigation Plan
7
DRAFT East Renton Lift Station - Permitting Requirements
November 6, 2009
Page 8
Table 1. East Renton Lift Station — Environmental Permit Matrix
City of Renton
Wetland Mitigation Ratios:
• Restoration or creation - 1.5:1
• Combination - 1:1 restoration or creation plus 1:1 enhancement
• Enhancement only — not typically allowed
Buffer Mitigation:
Restore disturbed buffers with native vegetation.
Review Timeline:
Minimum 12 weeks tollowiiig,,receipt of complete application.
King County
Wetland Mitigation Ratios:
• Creation 3:1
64
• Combination - 1:1 creation plus 4:1 enhancement
• �Rehabilitat►on - 8:1
•Enhancement only - 12: 1
buffers with native vegetation.
A
ESAAdolfson
memorandum
date November 6, 2009
5309 Shilshole Avenue NW
Suite 200
Seattle, WA 98107
206.789.9658 phone
206.789.9684 fax
to David Christensen, City of Renton Public Works
Lara Kammereck, Carollo Engineers
from Sara Noland and Cathie Conolly
subject DRAFT East Renton Lift Station - Permitting Requirem
Introduction
The City of Renton Department of Public Works is analyzing a pref
crossing through Maplewood Park in Renton, Washington. The stuff
corridor approximately 300 feet wide located in the central, undevel
connects an existing City of Renton pump statioglocated just north
148th Place SE south of the park. This memo uses the two alternati
June 2009 as the basis for the permittmgidi,"" ion -(these, routes ar(
by Tyler Whitehouse, Carollo Engineers,,,, June 10, 2009). Altern
stream and Alternative 2 on the east side.. 4ls
ESA Adolfson identified seven -pal ustri 11
within the study area boundaries.These
Wetland, Stream, and Wildlife Study (E;
Maplewood Park is anticipated to be trai
future. The City has requested assistanc
associated with disturbance of critical ar
like to know how the permit requiremen
the ownership of King County or the Cit
wetlands (design
-as are discussed
on, 2009).
www.ado"'Son,com
lute for a new gravity sewer line
;for this project is a north -south
irrtion of the park. The corridor
ra k to an existing sewer line within
.r line routes provided by Carollo in
i on a map emailed to ESA Adolfson
is located on the west side of the
etlands A through G) and two streams
it in the East Renton Lift Station
ed in=ownership from King County to the City at some time in the
valuating the permitting requirements and mitigation costs
n tliesite (streams, wetlands, buffers, trees). The City would also
the sewer line may differ depending on whether the park is under
Renton.
This memo addresses streams, wetlands, and wildlife habitat only. It does not address other types of critical areas
that may be present on the site (floodplains, geologic hazards, etc.).
Permitting Requirements
The attached matrix (Table 1) lists and compares the City and County permitting requirements related to streams,
wetlands, and vegetation specific to the study area. The study area does not contain types of wildlife habitats that
are regulated by either jurisdiction.
Please note that the U.S. Army Corps of Engineers, Washington State Department of Ecology, and Washington
Department of Fish and Wildlife also regulate alteration of streams or wetlands. The state and federal
�J
DRAFT East Renton Lift Station - Permitting Requirements
November 6, 2009
Page 2
requirements are described in Section 6 of the East Renton Lift Station Wetland, Stream, and Wildlife Study
(ESA Adolfson, 2009).
Permitting and Mitigation Costs
The following table (Table 2) compares the estimated permit fees for the City of Renton and King County. These
costs include only those local permits related to critical areas. State and federal permits would add costs.
Table 2. Estimated Permit Fees ,
Type of Fee
City of Renton
Kin lCoun ty,
Pre -application meeting
Free
Information mtg - Free
Pre.''-app meeting - $1,500 (est.)
App review mtg - $3,000 (est.)
SEPA review
$1,000
Hourly -fee
Critical areas review
100% of contractor'sfee for
Tobe determined_
independent third party review
(Otak)
Variance or exception
$1,200 for each type of variance
L o be determined
(e.g., buffers, tree removal, etc.)
Table 3 below presents the approximate costs of mitigation `for'critical areas impacts. These costs are preliminary
and have been developed"for:planrimg purposes only. The;following assumptions were used to develop these
estimates: %
• Impact areas were at from the June 2009"�alte " ive route maps provided by Carollo Engineers
overlaid on the wetland,stream, and buffer m p developed by ESA Adolfson. The area of construction
k
disturbance for the pipelineJs assumed to be a 20-foot-wide corridor based on discussion with the City.
• Impact areas are for the new pipeline only.,-[ uc#� r City aiid�Carollowould'any access roads be
required ?'Ifso`nleasen'rouide aooroaimate locations and3areas so we:can add hem';to the minact areas
• All mitigation would oecu'r on -site.
=� �,
• Wetland mitigation perpunit costs are presented as a range because there are several factors that affect the
level of effort needed (`e.g., amount of earthwork, need for soil amendments, etc.). The low end per unit
cost shown in the.table is based on a recent wetland mitigation project that ESA Adolfson designed for
Pierce County Public Works and which was then constructed in April 2008. This project included wetland
creation and wetland/buffer enhancement elements. The per unit costs for that project included grading,
erosion control measures, plants, seeding, mulch, compost, and wildlife structures (logs and snags). The
high end unit cost is based on actual mitigation costs that we developed for a City of Everett mitigation
project in 2008. The high end cost estimate assumes more grading and earthwork and a larger
requirement for soil amendment.
• Buffer mitigation and stream mitigation are assumed to consist of restoring areas that are disturbed during
construction. Additional mitigation measures that could be proposed as part of the project mitigation plan
are not included.
DRAFT East Renton Lift Station - Permitting Requirements
November 6, 2009
Page 3
• We have assumed the pipeline would be trenched through Wetland A (Alternative 2). The cost estimate
includes mitigation only for the direct impacts of trenching (estimated at 200 square feet), at the ratios
required by the City and County. Additional indirect wetland impacts may need to be mitigated in areas
where the pipeline is located inside the standard wetland buffers (e.g., where the pipeline crosses between
Wetlands A and B).
• Costs are for construction of mitigation areas only and do not include permitting costs or the fees
associated with mitigation design.
Table 3. Estimated Preliminary Mitigation Costs
Type of Mitigation
City of Renton '''
King County
Buffer restoration
A,,
Alternative 1: =
Alternative l
(native shrubs)
Impact area: 7,000 sf ` '
Impact area: 17,000 sf
Mitigation area: 7,000 sf Pp
011,11
Mitigation area: 17,000 sf
Mitigation unit cost: $3/sf �i
Mitigation unit cost: $3/sf
Total mitigation estimate: $21000�
Total mitigation estimate: $51,000
Alternative 2:
Alternative 2:
Impact area: 3,000 sf
Impact area: 19,000 sf
,- x
Mrtigat�on;area: 3,000 sf
Mitigation area: 19,000 sf
Mitigation unit cost: $3/sf
Mitigation unit cost: $3/sf
rt y ,
Total mitigation estimate: $9,000
Total mitigation estimate: $57,000
Wetland mitigation
iterna e 1: �_�
Alternative l:
(combination of creation and
Notapplicable (no direct wetland
Not applicable (no direct wetland
enhancement at ratios listed in
impact)
impact).
attached matrix)'
Alternative 2:
Alternative 2:
Impact"a11 rea: 200 sf
Impact area: 200 sf
Mitigation area: 400 sf
Mitigation area: 1,000 sf
M tigat16n unit cost: $2/sf - $6/sf
Mitigation unit cost: $2/sf - $6/sf
Total mitigation estimate:
Total mitigation estimate:
=$800 - $2,400
$2,000 - $6,000
Stream mitigation (restoration
Alternative 1:
Alternative 1:
of disturbed stream channel)
Impact area: 100 sf
Impact area: 100 sf
Mitigation area: 100 sf
Mitigation area: 100 sf
Mitigation unit cost
1�Irtigation�unrt cost
Total mitigation estimate
mod....
Total gation estite:
ma
_ �.. .
Alternative 2:
Alternative 2:
Not applicable (no stream crossing).
Not applicable (no stream crossing).
DRAFT East Renton Lift Station - Permitting Requirements
November 6, 2009
Page 4
Type of Mitigation City of Renton King County
Restoration of upland areas iue " Not applicable (all uplands are
outside of buffers Impact area: contained within buffers)
M itigation� area:
3
Mitigation unitcost
Total mit�gat�on estimate:
Alternative 2
Impact area-:
Mitigation area
Mitigation unitcost:
Total mitigatjon`"e _ "mate
�s
The costs provided above are for consiructionIand m installation of itigation only. The following items are
typically required as part of compensator mrtigation for critical area impacts but are not included in the above
cost estimates:
• Financial guarantees (surety
• Land acquisition;
• Mitigation plan design;
• Construction monitoring;
• Restoration of temporarily di
bonds);
areas;
• Preparation of as -built (record'"drawing) following installation of mitigation; and
• Annual or twice -annual site maintenance and monitoring (five years).
Mitigation cost estimates can be refined as more detailed information about the site and project is obtained.
Limitations
Within the limitations of schedule, budget, and scope -of -work, we warrant that this study was conducted in
accordance with generally accepted environmental science practices, including the technical guidelines and
criteria in effect at the time this study was performed. The results and conclusions of this report represent the
authors' best professional judgment, based upon information provided by the project proponent in addition to that
obtained during the course of this study. No other warranty, expressed or implied, is made.
4
DRAFT East Renton Lift Station - Permitting Requirements
November 6, 2009
Page 5
Thank you for the opportunity to provide this information to the City. If you have any questions, please contact
Sara Noland or Cathie Conolly at (206) 789-9658.
5
DRAFT East Renton Lift Station - Permitting Requirements
November 6, 2009
Page 6
Table 1. East Renton Lift Station — Environmental Permit Matrix
City of Renton
King County
Code Section:
Code Section:
RMC 4-3-050(L) - streams
KCC 21 A.24.355, 358 - streams
RMC 4-3-050(M) — wetlands
KCC 21 A.24.318, 325, 340 — wetlands
RMC 4-4-130 — tree removal
KCC 16.82 — tree removal
Wetland Classification: Category 3
may: E
Wetland Classification: Category 11
Wetland Buffers: 25 feet
Wetland Buffers: 125 feet
Stream Classitcation:�
Stream Classification:
Class 3 (main channel)
Type F (main channel)
Class 4 tributary) (
Type N (tributary)
Stream Buffers: p
Stream Buffers:
75 feet (Class 3)
P ...
115 feet (Type F)
35 feet (Class 4)
65 feet (Type N)
Type of Permit:
Type of Permit:
• Variance for reduction of standdrd bdfers wetland/stream
Critical Areas Li • near Alteration Exception from standard
impacts, tree removal in cntAl
icalareas
buffer requirements and/or for wetland/stream impacts.
• SEPA review.
SEPA review.
• Clearing and grading permit (obtained following land
use
Clearing and grading permit.
approvals).
DRAFT East Renton Lift Station - Permitting Requirements
November 6, 2009
Page 7
Table 1. East Renton Lift Station — Environmental Permit Matrix
City of Renton
• Tree Protect ion?rand Renlaceiii&itiP
King County
Submittal Requirements:
• Informational meeting
• Pre-application/feasibility meeting
• Application review meeting
• Critical Areas Linear Alteration Exception form
• Land Use permit application form
• Legal description
Assessor's maps
Site plan
F
• Water and sewer availability certificates
• SEPA Checklist
• Affadavit of critical areas compliance
• Applicant legal status form
• Copies of variance decisions
• Fire district receipt
• Proof of legal lot status
• Critical Areas Study
• Mitigation Plan
7
DRAFT East Renton Lift Station - Permitting Requirements
November 6, 2009
Page 8
Table 1. East Renton Lift Station —. Environmental Permit Matrix
City of Renton
Wetland Miti�,,ation Ratios:
• Restoration or creation - 1.5:1
• Combination - 1:1 restoration or creation plus 1:1 enhancement
• Enhancement only — not typically allowed
Buffer Mitigation:
Restore disturbed buffers with native vegetation.
Review Timeline:
Minimum 12 weeks followiii'g,receipt of comp
King County
Wetland Mitigation Ratios:
• Creation-°','3:1
• Combination - 1:1 creation plus 4:1 enhancement
• Reliabditation - 8:1
• Enhancement only - 12: 1
rbed buffers with native vegetation.
El
�OOOOOi�I'OOOi
t�l
f
C:bw_wabnSblEl.a�AE.V.^[F�MnF]6902�FIWRE I [] 1-xw 0!3]nl .F:mr1 MEiS:
MEilAXO -'-- uiEAN.TrvE1 MEcigN OF SEOw
En1[Y1 � ALTERMI�INE ] ORFC110N OE Ro1Y
1 KING COUNTY REQUIREMENTS
RESOURCE CLASSIFICATION BUFFERS
WETLANDS A - G CATEGORY II 125 FEET
MAIN STREAM TYPE F 115 FEET
ESA DONFlRNEED TRIBUTARY TYPE N 65 FEET
EXIST
NOR T 6
EAST OF
CONCRETE PAD SUMMARY
ON JUNE 19, T009
WETLAND BUFFER VIOLATED ALONG ENTIRE
ROUTE THROUGH MAPLEWOOD PARK FOR BOTH
ALTERNATIVES.
STREAM BUFFER VIOLATED ALONG MAJORITY
OF ROUTE. THROUGH MAPLEWOOD PARK FOR
BOTH ALTERNATIVES
\J ADD�1iONK
'���SYT SURVEY
f REOURED
/7 WETV
EAST.
/7aSURVE
MAPLEWOOD PARK
BOUNDARY
FIGURE 1
EAST RENTON SEWER ROUTE ALTERNATIVES
MITIGATION REQUIREMENTS
2009 WASTEWATER LIFT STATION PRE -DESIGN
CITY OF RFNTON
� Car--�►-�
C:1— ..Ni,.gip,.i.,n s.ljs i iY.m 763g FIGURE f & 2 7-360g 0 5— JS— %REFS:
C Ca rA1l'ot
Engineers... Working Wonders With Water'
1218 THIRD AVENUE, SUITE 1600
SEATTLE, WASHINGTON 98101-3032
FAX: (206) 903-0419
PHONE: (206) 684-6532
TRANSMITTAL FORM
ADDRESS: Renton City Hall - Fifth Floor
1055 South Grady Way
Renton, WA 98057
X.
1
�N
q,JJ SUBJECT:
N w0#:
COPIES TO:
ATTENTION: Dave Christensen, Wastewater Utility Supervisor
THE FOLLOWING ITEMS ARE:
❑ REQUESTED ❑ REPORT
® ENCLOSED ❑ TEST RESULT
❑ SENT SEPARATELY ❑ SPECIFICATION
VIA: UPS
❑ COST ESTIMATE
❑ CHECK PRINT
❑ PROGRESS EST.
April 29, 2010
2009 Wastewater Lift Station
Pre -Design
8235C.00
File
❑ CALCULATIONS
❑ OTHER
NO. OF COPIES
DESCRIPTION
3
30% East Renton Lift Station Elimination Specification TOC
3
30% East Renton Lift Station Elimination Construction Cost Estimate
3
30% East Renton Lift Station Elimination Construction Schedule
3
30% East Renton Lift Station Elimination Drawings
THESE DATA ARE SUBMITTED:
❑ AT YOUR REQUEST ❑ FOR YOUR REVIEW ® FOR YOUR FILES
❑ FOR YOUR APPROVAL ❑ FOR YOUR ACTION ❑ FOR YOUR INFORMATION
GENERAL Please find enclosed three copies of the East Renton Lift Station Elimination project deliverables.
REMARKS:
Sincerely,
CAROLLO ENGINEERS, P.C.
La.A.5_ Kara
By: Lara Kammereck, P.E.
-pw:\1 Cllent\WA\Renton\8235X00\Correspondence\Client\Christensen T-20100429.doc
CITY OF RENTON
EAST RENTON LIFT STATION ELIMINATION
PRELIMINARY - 30% DESIGN SUBMITTAL
TABLE OF CONTENTS
DIVISIONSI-9-SP_ECIAL_P_ROV_ISIONS_(P_ART 1)
2008 WSDOT STANDARD SPECIFICATIONS
2008 WSDOT STANDARD SPECIFICATIONS WITH CITY OF RENTON REVISIONS
DIVISION 10 - SPECIAL PROVISIONS (PART 11)
SECTION 10.01 - GENERAL REQUIREMENTS
SUB -SECTION TITLE
NO.
10.01140 WORK RESTRICTIONS
10.01410 REGULATORY REQUIREMENTS
10.01500 TEMPORARY FACILITIES AND CONTROLS
SECTION 10.02 - SITEWORK
10.02314 LOW DENSITY CONCRETE BACKFILL
10.02992 TEMPORARY STREAM DIVERSION
SECTION 10.03 - CONCRETE
10.03300 CAST -IN -PLACE CONCRETE
SECTION 10.04 - MASONRY
NOT USED
SECTION 10.05 - METALS
NOT USED
SECTION 10.06 - WOOD AND PLASTICS
NOT USED
SECTION 10.07 - THERMAL AND MOISTURE PROTECTION
NOT USED
April 29, 2010 - DRAFT TOC-1 8235C00
pw:\\PHX-POP-PW.Carollo.local:Carollo\Documents\Client\WA\Renton\8235C001Specifications\East Renton Specification TOC.doc
SECTION 10.08 - DOORS AND WINDOWS
NOT USED
SECTION 10.09 - FINISHES
NOT USED
SECTION 10.10 - SPECIALTIES
NOT USED
SECTION 10.11 - EQUIPMENT
NOT USED
SECTION 10.12 - FURNISHINGS
NOT USED
SECTION 10.13 - SPECIAL CONSTRUCTIONS
NOT USED
SECTION 10.14 - CONVEYING SYSTEMS
NOT USED
SECTION 10.15 - MECHANICAL
10.15052 BASIC PIPING MATERIALS AND METHODS
10.15121 PIPE COUPLINGS
10.15265 POLYVINYL CHLORIDE PIPING
10.15267 HIGH DENSITY POLYETHYLENE PIPING
10.15770 TRACER WIRE
10.15956 PIPING SYSTEMS TESTING
SECTION 10.16 - ELECTRICAL
NOT USED
SECTION 10.17 - INSTRUMENTATION
NOT USED
April 29, 2010 - DRAFT TOC-2 8235C00
pw:\\PHX•POP•PW.Carollo.local:Carollo\Documents\Client\WA\Renton\8235C00\Specifications\East Renton Specification TOC.doc -
rgv�ee+s..MbMvp NSvtet NLn �•Mer
PROJECT SUMMARY
Project: East Renton Lift Station Elimination
PRELIMINARY - 30% DESIGN SUBMITTAL
Job #: 8235C00
Location: Renton, WA
Zip Code: 98055
Estimate Class: 3
PIC: Brian Matson
PM: Lara Kammereck
Date: April 28, 2010
By: Tyler Whitehouse
Reviewed: Brian Casey
- NO ,„ `� -' DESCRIPTION �, � � `"�� 'e �'�`"� 'TOTAL• '°�`
•I'Sw &,. .... .v".14 �w S'FT7.�"a. s{4'F..$ �; .8{ "`..; �.. t Tz s �.l`.: ?S '�1h . r.3�. 33..i r<aF r. �sY
01 12-inch SS STA 0+00 to 0+76
$28,725
02 15-inch SS STA 0+76 to 8+58
$148,842
03 15-inch SS STA 8+58 to 10+31
$42,383
TOTAL DIRECT COST
$219,949
Contingency
30.0% $65,985
Subtotal
$285,934
General Contractor Overhead, Profit & Risk
10.0% $28,593
Subtotal
$314,527
Gross Receipts Tax (Based on King County, WA)
9.5% $29,880
Subtotal
$344,407
General Conditions
15.0% $51,661
TOTAL ESTIMATED CONSTRUCTION COST
$400,000
The cost estimate herein is based on our perception of current conditions at the project location. This estimate reflects our professional opinion of
accurate costs at this time and is subject to change as the project design matures. Carollo Engineers have no control over variances in the cost of
labor, materials, equipment; nor services provided by others, contractor's means and methods of executing the work or of determining prices,
competitive bidding or market conditions, practices or bidding strategies. Carollo Engineers cannot and does not warrantor guarantee that proposals,
bids or actual construction costs will not vary from the costs presented as shown.
f/n: East Renton Construction Cost Estimate.xls-PROJECT SUMMARY Page 1 of 1 Printed: 4/28/2010-3:20 PM
Build 60st atrix
Help?
RECAP
MATRIX
Project:East Renton Lift Station Elimination
PRELIMINARY - 30% DESIGN SUBMITTAL
Date : April 28, 2010
Job #:8235C00
Location: Renton, WA
Estimate Class:
3
By: Tyler Whitehouse
SPEC. DIVISION/
DIV. 01
DIV. 02
DIV. 03
DIV. 04
1 DIV. 05
1 DIV. 06
DIV. 07
DIV. OB
DIV. 09
DIV. 10
DIV. 11
DIV. 12
DIV. 13
DIV. 14
DIV. 15
DIV. 16
Div 17
ELEMENT
ELEMENT
ELEMENT
GEN
SITE
CONC
1
MSNRY
1
METALS
WOOD &
MOIST
DOORS &
FINISHES
SPECIAL-
EQUIP
FURN
SPECIAL
CONVEY
PLUMBG
ELECT/
INST.
% of
DESCRIPTION
REQTS
WORK
Plastics
PROTN
WDOS
TIES
CONST
& MECH
I & C
& CONT.
TOTALS
Total
01 12-inch SS STA 0+00 to 0+76
$24,012
$3,287
$1,426
$28,725
13.06
02 15-inch SS STA 0+76 to 8+58
$1121279
$36,562
$148,842
67.67
03 15-inch SS STA 8+58 to 10+31 -------_
____ __ ___
___ $34.294 -------------------------------------------------------------------------------------------------............... '•-•-----•--••---------•-__._"--'------'------••----------'----'----------•---------------"..-•'-'-'---.....'-"-'--'------------------------------•-------...----L.—....--•--'-----------------
$8,069
$42,383
---------'--------'
19.27%
----------------
Total Direct Cost
0
170,585
3 287 0
0 0 0
0 0 0 0
0 0
0 46 077 0
—•----'-------------0.00--------------'—'
0
$219 949
------.-100
-----------------
'-"- . -----------------------------------I------- ---- - ----------"------------_--•
PercentofTotal
------•-...__...._•--
0.00%
"-•-•-------e-.....--.'...'—"---------------'
77.56%
1.49% 0.00%
__.—.__•------_._0.00%...----0.00
0.00% 0.00% 0.00%
.—'-------------------0.00- --------0.00 -------0.00-------
0.00% 0.00% 0.00% 0.00%
0.00...----
0.00% 0.00%
0.00% 20.95% 0.00%
.00%
0.00%
00%
100.00%
COMMENTS/NOTES
_ 1_ Note that the above costs DO NOT include all of the applicable mark-ups for the total construction or project cost. Refer to the SUMMARY for these values
---------------
Tn 11-R-1.0 1—ti.c tE.11— I. -COST MATRIX Page 1 of 1
ca•� :af'-ft
DETAILED COST ESTIMATE
Project:
East Renton Lift Station Elimination
PRELIMINARY - 30% DESIGN SUBMITTAL
Job #:
8235C00
Date : April 28, 2010
Location:
Renton, WA
By: Tyler Whitehouse
Element:
01 12-inch SS STA 0+00 to 0+76
Reviewed: Brian Casey
SPEC NO
DESCRIPTION
QUANTITY
UNIT
UNIT
COST.
SUBTOTAL
TOTAL
z,V71" 1a
_«
44
**((}
Division 02 - Site Construction
02000
Plug Existing Pipeline and Abandon
2.00
LS
$394.82
$789.64
02000
Misc Connection Allowance
2.00
LS
$581.84
$1,163.68
02000
Misc Site Restoration 0+00 to 0+76
1.00
LS
$5,000.00
$5,000.00
02000
Trench Box per Day
10 00—Day
$60:78
$607--82
02000
Bypass Pumping SSMH 73
1.00
LS
$5,000.00
$5,000.00
02000
Bypass Pumping SSMH 72A
1.00
LS
$5,000.00
$5,000.00
02220
Core Drilling, 16" Diameter
1.00
LF
$305.47
$305
02240
10Hp Submersible Pump, 3" Elect.
10.00
DAY
$144.42
$1,444
02300
10 Cy Dump Truck, 10 Miles/Round Trip
24.63
CY
$9.99
$246
Cat 225 Trackhoe, 1 Cy Bucket, Class B (Medium Digging),
02300
0-16' D
118.22
CY
$5.52
$653
Imported Pipe Bed & Zone/Confined Structure Backfill,
02300
Class B Material
24.63
CY
$84.85
$2,090
Native Trench Backfill/Unconfined Struct. Bf, Class B
02300
Material
93.59
CY
$18.29
$1,712
Total
$24,012
Division 03 - Concrete
03000
Concrete Manhole Fill
21.09
CY
$155.85
$3,286.88
Total
$3,287
Division 15 - Mechanical
15265
12" Sdr-35 Pvc Sewer Pipe, In Trench
76.00
LF
$18.77
$1,426
Total
$1,426
Grand Total
$28,725
f/n: East Renton Construction Gosh Estmatn.ds-01 12-inch SS STA 0.0010 0-76 Page 1 of 1 Form Rev. 2008J—
-G
Project: East Renton Lift Station Elimination
PRELIMINARY - 30% DESIGN SUBMITTAL
Job #: 8235C00
Location: Renton, WA
Element: 02 15-inch SS STA 0+76 to 8+58
DETAILED COST ESTIMATE
Date : April 28, 2010
By: Tyler Whitehouse
Reviewed: Brian Casey
P
DESCRIPTION
QUANTITY
fSUBTOTAL
,
0TOTAL
Division 02 - Site Construction
02000
Misc Site Restoration 0+76 to 8+58
1.00
LS
$5,000.00
$5,000.00
02000
Misc Connection Allowance
2.00
LS
$581.84
$1,164
-02000
Stream Diversion Allowance
1.00
LS
$10,000.00
$10,000.00
02000
Utility Relocation Allowance
-.00-ES-$10-,000:00-$10-1000-.00
02000
Restricted Access Allowance
1.00
LS
$5,000.00
$5,000.00
02000
Trench Box per Day
25.00
Day
$60.78
$1,520
02220
Core Drilling, 20" Diameter
1.00
LF
$643.66
$644
02240
10Hp Submersible Pump, 3" Elect.
25.00
DAY
$144.42
$3,611
02300
Cut & Remove Tree, 8" Diameter
13.00
EA
$415.60
$5,403
02300
Cut & Remove Tree, 24" Diameter
9.00
EA
$675.35
$6,078
02300
06 Dozer, Class B (Medium Dig), Grade, Cut, Fill &
Compact, 300'Haul
1,158.52
CY
$10.46
$12,119
02300
10 Cy Dump Truck, 10 Miles/Round Trip
298.68
CY
$9.99
$2,985
02300
Remove Grass & Shrubs, 4" Depth To 1 Acre
0.36
AC
$1,154.03
$415
02300
Tractor/Backhoe, 12" Bucket Class B (Medium Digging), 0-
5'D
41.48
CY
$46.25
$1,918
02300
Hand Excavation, Class B Material To 2.5'Depth
5.19
CY
$149.52
$776
02300
Native Trench Backfill/Unconfined Struct. Bf, Class B
Material
41.48
CY
$18.29
$759
02300
Cat 225 Trackhoe, 1 Cy Bucket, Class B (Medium Digging),
0-16'D
1,031.81
CY
$5.52
$5,698
02300
Imported Pipe Bed & Zone/Confined Structure Backfill,
Class B Material
298.68
CY
$84.85
$25,344
02300
Native Trench Backfill/Unconfined Struct. Bf, Class B
Material
733.13
CY
$18.29
$13,410
02666
40 Mil Hdpe Liner, Not Textured - Under 3 Acres
700.00
SF.
$.62
$436
Total
$112,279
Division 15 - Mechanical
15265
Fusible 16" Sdr-25 Pvc
782.00
LF
$46.76
$36,562
Total
$36,562
Grand Total
$148,842
fl, East R-n C-tion Cost Estwnate.)ds-02 15-itch SS STA 0- 76 to 8-58 Page 1 of 1 Form R- 2008J-
Project: East Renton Lift Station Elimination
PRELIMINARY - 30% DESIGN SUBMITTAL
Job #: 8235C00
Location: Renton, WA
Element: 03 15-inch SS STA 8+58 to 10+31
DETAILED COST ESTIMATE
Date : April 28, 2010
By: Tyler Whitehouse
Reviewed: Brian Casey
SPEC NO
�
DESCRIPTION
QUANTITY
W
UNIT
z
L � ;�.�" F^. iT4"
i UNIT COST'
"§. :9}.
3 SUBTOTAL`;
Division 02 - Site Construction
02000
Misc Site Restoration 8+58 to 10+31
1.00
LS
$5,000.00
$5,000.00
02000
Misc Connection Allowance
2.00
LS
$581.84
$1,164
02000
Trench Box per Day
20.00
Day
$60.78
$1,216
—02220—Demo
Pvc Pipe From Trench,-4"=18'-Incl.-Fittings
173:00—L-F
$434
$751
02220
Asphalt Pavement Cutting
1,384.00
inFT
$.78
$1,078
02220
Core Drilling, 20" Diameter
1.00
LF
$643.66
$644
02220
Remove 4"-6" Asphalt Pavement
994.75
SF
$.67
$670
02240
10Hp Submersible Pump, 3" Elect.
20.00
DAY
$144.42
$2,888
02300
10 Cy Dump Truck, 10 Miles/Round Trip
66.08
CY
$9.99
$660
02300
Cat 225 Trackhoe, 1 Cy Bucket, Class B (Medium Digging),
0-16' D
240.28
CY
$5.52
$1,327
02300
Imported Pipe Bed & Zone/Confined Structure Backfill,
Class B Material
66.08
CY
$84.85
$5,607
02300
Imported Trench Backfill/Unconfined Struct. Bf, Class B
Material
174.20
CY
$41.86
$7,291
02742
4" Pavement Replacement On 6" Abc Over Trench
994.75
SF
$6.03
$5,997
Total
$34,294
Division 15 - Mechanical
15265
15" Sdr-35 Pvc Sewer Pipe, In Trench
173.00
LF
$46.76
$8,089
Total
$8,089
Grand Total
$42,383
f/m East Renton Coratmction Cost Estmate,45-03 15-mh SS STA 8-58 to 10�31 Page 1 of 1 Form R— 200WJ
2
East Renlcn
= Mptilands-_ _
PROJECT SITE_ : f
'ry
Cas•.ade Fnrwvo0(;; s•F wvoA Gd
MapkL ,
Hep�LslaAe+
313 -SC !'6nS MGanIry GAW
Des1rc .i a '.
i
1+67 -
Benson 151I B a a -•
(LP� 1i9
. 4
REFERENCE: 2010 GOOGLE MAP
VICINITY MAP
NO SCALE
REFERENCE: 2007 GOOGLE EARTH
LOCATION MAP
NO SCALE
BURIED UTILITIES IN AREA
PLEASE CALL BEFDRE YOU DIG
1.em.424.5555
CITY OF RENTON
EAST RENTON LIFT STATION_
ELIMINATION
M. C4S
z
,aas2
?'mONAL t'
PRELIMINARY - 30% DESIGN SUBMITTAL
PROJECT NO. WWP-27-3549
CITY OF RENTON
1055 SOUTH GRADY WAY
RENTON, WA 98057
The undersigned has approved this
document for and on l7ehelf
of Carollo Engineers, P.C.
Partner
APRIL 2010
CONTACT PERSONNEL
DAVE CHRISTENSEN WASTEWATER UTILITY SUPERVISOR (425) 430-7212
NO. I REVISION
DRAWING LIST
SHEET NO. DRAWING NO. DESCRIPTION
1
G-01
COVER SHEET
2
G-02
GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS
3
C-01
SITE PLAN, CONSTRUCTION LIMBS, ACCESS, AND STAGING
4
C-02
YARD PIPING KEY PLAN
5
C-03
PIPING PLAN MID PROFILE - STA D+00 - STA 5+00
5
C-04
PIPING PLAN AND PROFILE - STA 5+00 - STA 10+31
7
C-05
MLSCELLANEOUS DETAILS - I'
PRELIMINARY - 30% DESIGN SUBMITTAL
�►® CITY OF EAST RENTON LIFT STATION APRIL2010
RENTON ELIMINATION 7
PlanninglBaiiding/PuElic Wmb Dept COVER SHEET 6-01
i
z
u
GENERAL NOTES: SURVEY LEGEND (EXISTING LINE WORK) MECHANICAL LINE WORK DRAWING CROSS REFERENCE
1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE STARTING WORK
AND SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY DISCREPANCIES.
NEW OR EXISTING STRUCTURES
2. UNLESS DETAILED, SPECIFIED, OR OTHERWISE INDICATED ON THE .� WATER VALVE MONUMENT NOT TIED THIS SURVEY DETAIL OR SECTION
DRAWINGS, CONSTRUCTION SHALL BE AS INDICATED IN THE APPLICABLE HYDRANT NEW OR EXISTING STRUCTURES HIDDEN — — — — — — — IDENTIFICATION
TYPICAL DETAILS AND GENERAL NOTES. TYPICAL DETAILS SHALL APPLY ;_i FIRE DEPT. CONNECTION °`r FOUND CASED MONUMENT
EVEN THOUGH NOT REFERENCED AT SPECIFIC LOCATIONS ON DRAWINGS. WATER METER SET PK NAIL/ALUMINUM WASHER NEW PIPING (TRIPLE LINES) — D 1
POST INDICATOR VALVE STAMPED 'PACE CONTROL' — — — — —
3. WHERE NO CONSTRUCTION DETAILS ARE SHOWN OR NOTED FOR ANY PART NEW PIPING HIDDEN (TRIPLE LINES) —
OF WORK, DETAILS SHALL BE THE SAME AS FOR OTHER SIMILAR WORK 1=�/ MANHOLES (SS/SD) SET 5/8' IRON REBAR W/ YELLOW — — DETAIL OR SECTION TAKEN
CB - PLASTIC CAP STAMPED L.S. #33130 NEW PIPING (SINGLE LINE) ON THE SAME SHEET
{= POWERIUTILITY POLE UNLESS OTHERWISE STATED.
ABBREVIATIONS -- GUY ANCHOR NEW PIPING HIDDEN (SINGLE LINE) — — — — — — —
:y JUNCTION BOX
DETAIL OR SECTION IS
AK
AB ANCHOR BOLT R OR RAD RADIUS POWER TRANSFORMER EXISTING PIPING (TRIPLE LINES) ----- —
�' INDICATED
T EN ON THE DRAWING
ABC AGGREGATE BASE COURSE RREDUCER -- POWERMELEPHONE VAULT
— — — — -- — —
AC ASPHALTIC CONCRETE REF Ef REFERENCE
'-� EXISTING PIPING HIDDEN (TRIPLE LINES) -------- _
AFF ABOVE FINISHED FLOOR REINF REINFORCE (D) (ING) (MENT) �PA1 POWER METER CENTER LINES - ----------- — AT TITLE
AHR ANCHOR REQD REQUIRED t1 TELEPHONEITV RISER PROPERTY LINES
ALM—ALARM --- EXISTING PIPING (SINGLE LINE)
,,"D RIGHT-OF-WAY LINES --------
AL ALUMINUM S SEWAGE ORSOUTH - GAS VALVE EASEMENT LINES
APPROX APPROXIMATE SCV SWING CHECK VALVE 'T GAS METER EXISTING PIPING HIDDEN (SINGLE LINE) — — — — — — — TYPICAL DETAIL REFERENCE
ASTM AMERICAN SOCIETY OF TESTING AND MATERIALS SO STORM DRAIN S--.' LOT LINES — — — ---- BUBBLE
_�—•,_,\ STREET LIGHT DITCH LINE AUTO AUTOMATIC SSIMILAR —
AVG AVERAGE SPEC
NEW EQUIPMENT OR PIPING CENTERLINE
C SPECIFICATION x' SPOT ELEVATION WATER LINE --------
@ AT SS SANITARY SEWER, GRAVITY — SIGN SANITARY SEWER LINE --- TYPICAL DETAIL NUMBER
SSFM SANITARY SEWER FORCE MAIN MAILBOX STORM DRAIN LINE ----- EXISTING EQUIPMENT OR PIPING CENTERLINE -- — IDENTIFICATION
BSP BLACK STEEL PIPE SSMH SANITARY SEWER MANHOLE GAS LINE
ROCKERY --
SST STAINLESS STEEL UNDERGROUND POWER LINES 'r --- NEW EQUIPMENT DETAILORSECTION
CA CONCRETEANCHOR STA STATION'S UNDERGROUND TELEPHONE LINES — ---'- IDENTIFICATION
_� CONIFEROUS TREE UNDERGROUND CABLE TV LINES -- NEW EQUIPMENT HIDDEN N-L N
CB CATCH BASIN STD STANDARD ��, — — —
CHNL CHANNEL STL STEEL �-^� OVERHEAD UTILITY LINES .x ------ TYP D-1
CJ CONSTRUCTION JOINT S/W SIDEWALK { } DECIDUOUS TREE CHAIN LINK FENCE EXISTING EQUIPMENT
CL OR CENTERUNE WIRE FENCE — a -- s . — EFERTAIL OR SECTION
CLP CONTROL PANEL TDH TOTAL DYNAMIC HEAD ICV IRRIGATION CONTROL VALVE WOOD FENCE NEW FITTING
' REFERENCE BUBBLE
CND CONDUIT TOC TOP OF CONCRETE
CO CLEANOUT TYP TYPICAL / DETAIL OR SECTION IS TO BE
COMP COMPACTED EXISTING TO BE REMOVED FOUND ON THE SAME SHEET
CONC CONCRETE V OR VLV VALVE
CONN CONNECTION VERT VERTICAL
CONSTR CONSTRUCTION VOL VOLUME NEW PIPING CALL-OUT3' PW DETAIL SECTION I T
CONT CONTINUE (D) (OUS) OR CONTROL BE FOUND ON THE DRAWING
CP CONTROL POINT W WEST, WIDTH BUILDING MATERIALS INDICATED
CPLG COUPLING W/ WITH TYPICAL
PIPING CALL -OUT 3` F"rti TYPICAL DETAIL IS TO BE
D DRAIN, DEPTH W/O WITHOUT VIEW IN SECTION FOUND
NTHE
sPICAL
DETAIL DBH DIAMETER BREAST HEIGHT DEG DEGREE MATERIAL EXISTING REMOVE NEW
DET DETAIL CLASS -A-, -B-, AND '
DIA OR DIAMETER 'D' CONCRETE '••.• AT CROSS REFERENCE
DIM DIMENSION
DIP DUCTILE IRON PIPE CLASS'C' CONCRETE
DWG DRAWING
EA EAST STEEL ® '�
EL OR ELEV ELEVATION
ELEC ELECTRIC (AL)
EMBED EMBEDMENT CAST IRON OR
ENGR ENGINEER FIBERGLASS
EDP EDGE OF PAVEMENT
EQL EQUAL ALUMINUM
EQPT EQUIPMENT
EXIST EXISTING
FLG FLANGE SOIL
FRP FIBERGLASS REINFORCED PLASTIC
FT FOOT, FEET VIEW IN PLAN (NEW SHOWN - EXISTING SCREENED)
GIS GEOGRAPHIC INFORMATION SYSTEMS
GRATING SPAN PAVEMENT
HOPE HIGH DENSITY POLYETHYLENE
ID INSIDE DIAMETER OR INSIDE DIMENSION
IE INVERT ELEVATION
INVT INVERT OTHER
L LENGTH
LF LINEAR FEET - VIEW IN PLAN
MAX MAXIMUM EXISTING
MOD MAXIMUM DRY DENSITY WETLAND
MECH MECHANICAL
MFRS MANUFACTURER'S
MH MANHOLE, SANITARY
MIN MINIMUM STREAM
MISC MISCELLANEOUS -
N NORTH
NE NORTH EAST .
NO NUMBER
NOM NOMINAL -
NIS NOT TO SCALE
OD OUTSIDE DIAMETER
PL PROPERTY LINE
PNL PANEL
PSI POUND PER SQUARE INCH
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
M. PRELIMINARY - 30% DESIGN SUBMITTAL
Q� of "'y es _ - R
e i NTS - CITY OF EAST RENTONLIFTSTATION APRIL2010
Tv
���� RENTON ELIMINATION _
BURIED UTILITIES IN AREA
PLEASE CALL BEFORE YOU DIG eM DATUM Planning/BuilCing/Public WoDept GENERAL NOTES, ABBREVIATIONSG-O2
�9roNu. BR' rla
1.800.424.5555 NO. REVISION BY DATE APPR AND SYMBOLS
2100
z
o- CONSTRu 7m
19
1
0
Kol
1 1 2 MH 5315 135
4 RIM EL=$98.04t
CL CHNLf12-PVC IN, E)=386.39t
S I
14
IS?GRk'>';ATER
P_ENTENTION
Po1aD
1 -, -- -
) ENE •�„� �r
ff 1 12• SS
I
1
f MH 5: 140 n
ID } IG ..'P. C
WCEDAR
t`"Ilk
-398�
A PLAN
C-02 SCALE: 1- = 20'
FILE: 8235COD-C-100
BURIED VnUTIES IN AREA
PLEASE CALL BEFORE YOU DIG
1.800.424.5555
f
p erl
�3 s-•�
) &0-4
a
i
�{ow
t
EAST RENTON%
LIFT STATION
/ 1 MH 5314 078 � � -
RIM EL = 40120 --•�
CL CHNL 12- (E. W) = 38720
i
lQN WC4
O4 :°� SHE �%•
4
�0 44�tatP"
�alonu 61`'
NO.
REVISION
�� DATUM
GENERAL NOTES:
A.
KEY NOTES: .
1O ANTICIPATED MANHOLE USED FOR TEMPORARY BYPASS
PUMPING. COORDINATE ACCESS WITH CITY PERSONNEL.
2O LOCATION AND DATA FOR EXISTING MANHOLE IS
BASED ON CITY OF RENTON GIS DATA AND IS
APPROXIMATE.
PRELIMINARY - 30% DESIGN SUBMITTAL
CITY OF EAST RENTON LIFT STATION APRIL 2010
RENTON ELIMINATION
Planning/Building/PuNicWmlu:DePL MISCELLANEOUS DETAILS - I C-05
t
GENERAL NOTES:
A.
t
\Z7
r t p
4�;7
'cyTF
KEYNOTES:
25� 215
Sow mw-s BR�AR HILLS
244
-6, rn 0 3 FOOT COVER ASSUMED.
U) CONTRACTOR TO VERIFY.
>
+
%14 C)
F r
E I
1 $2 0150-11JWC
IE W t 02
IE _,�IS E-13110M,107
114a, 4 Lk
TOO,
I",
KINC m
0 cn
aE11111.17
(DW 03)
-,vyN rn
'S riF co*"S RUC. IO.N 15"SS i
A
E CFDAR
.2
"W
•
R = 370.00
14�111l IL .1.
2TE
A=61 2115r
L 396.28 "2
6153-11.12/w
rW71669429
�leoa$ -no
10-09
MH 5314 09
f E 3TcW1(*3X20
STA IG130.730
15"SS
f
L
Will
MH 5314 086t
STA 8+
1
IE Irmp(sw)-n.73
Ki 5314 M
RU El,-37+53
PVC(
CL 0011. Ir HXJ-36.03
om 15
E=13168wlm
DZO-575,71
///���{{{...
t35D-10.2R/C
-1777TT765
r,1318745-5a
aEV-378.22
F�
BLRED GAS
PFUJOE72
PLAN
SCALE: lK = 27
FILE: 8235CDOL-100
72.31 LF
250.00 LF
385
385
k
<
APPROXIMATE
EXISTING GRADE
380
380
4;
APPRO)OMAI
t
EXISTING GRADE
co
9 F-
375
LLI
375
15- SS @ 0-0209
=Wr
U)
LLJ
w
370
c) 370
+
ZZ
$- ss d
0-0209
Lo
365
1-4.
w 365
F-
LL
LU
-J
L)
360
LUd
w
d. k
360
UJ
LU
15' SS --2 004
z
355
355
ij-
kJ
350
>0
z
rt - i,
1:
350
STA 10+50 STA 10+00 STA 9+50 STA 9+00
STA 8+50 STA 8+00 PROFILE S17+1 STA 7+00
STA 6+50 STA 6+00 STA 5+50 STA 5+00
a5carovlffo
't; M.
SCALE: HORIZV� 20'VERT: 1'=
FILE 8235COO-C-100
1�-20`
TM,
PRELIMINARY 30% DESIGN SUBMITTAL
1, m TY 0 F --APRIL 2010
C I EAST RENTON LIFT STATION
ELIMINATION
BURIED UTIUMES IN AREA o
HPG
1
RENTON —
PlanninglBuilding/Public Works Dept PIPING PLAN AND PROFLE -STA 5+00 10+31 7-04
PLEASE CALL BEFORE YOU DIG AL
amc
-STA
I.SW.424.5555 NO.
REVISION BY DATE APPR
GENERAL NOTES:
A.
-2 f `f
x Iz:
�j // \.` 0 I s
s (i. \(j'V -
t
�_'
.�
�/ I �`, DE_EN.ION
C Vc /,� `�" E �x
ti
KEY NOTES:
- t Pit-
IEa330.7
VGNF I
tPp-
I
1 PLUG AND ABANDON IN PLACE? V#s�
2 ONCRETE FILL O LOWEST PIPE INVERT ELEVATION.
\
•
14=178�D5:
E-13166MO% MH 5314 079 I
D_N--3928
3 3 FOOT COVER ASSUMED. CONTRACTOR TO VERIFY.
y l F •1
✓�
I
6 0. `� CFj3
\ ti r80.36E�2
1:af3186S2812 �'i•'3
- MRS OF CON97RLiC?,ON � /.�'�%
'35D-IlliA ['^ Ak '✓ b iOKt i.3� STA 0+75.T7
f..1315501.979
=1
A7
�}. -N-.83 °"9U-Y 2R��
t' 6,y •..ti-r �— .m---�x5}r�ai.lSSe
Ir
15' SS - p.m-._... Q`'Zht'>9 '' _ \•.'^' f9 I
r
I,... -ice
cil
0 `�/ R i
tb�°1�t50 3+SOr r r �.., 3+00
,4�LC` — — — — — .e.
2+50 I, 2+00� 39 1+50i_�
�.- — — — .s...... — e..�. �.� \ � � � ..�. lit�1•��
�L`t`f
:��; - �.�.L .L
\\ 11i Ike.
—_ ___ ".'•-y �r
� � 14�.1 — ---- — �' `�`q�77o s-✓ �� k=37.35
14In
I=1T D Wq t 'j i ' ` �./ l`..._` �l q�� r ` , .•.._,••- Ott` �'!, —' N-----�.� { �. 30_tPE°_
jF .." 7 7 ::.^•+::'^ •' ,2 �iN=39S.;4 i� t i`
�
_
�sl�� 8�:(fe''
f 1 e t �ri.'_'
�4I
0
a
�/ /
f --
� +��• a�'E 3� �?:P{tI51Ap•395.3 p' I ti 6
FENCE '1
2
r t
1
�. �
�—
Gee w
l
:`•i m a
Qt 1 9
L
A /
N r�
zt 3
v r.; oo _ � �
q
1 3;•CFDAR
_ p
t t sti
i j f 2 1
tJ 12' SS
!4' W I .p
t t
t n
16' `l� li
1 � A APLEWQOEJ
O _ t
t/ ESTATES
E - S
'All
MH 5314 080
PLAN STA 0+00.01) EAST RENTON
LIB S7aT1Civ
SCALE: 1• = 20
FILE: 8235C00-C-100
_
424.23 LF
15.77 LF
395
I
APPROXIMATE EXIST G
�—
_ _
395
390
o
_
X �
/J y
�(jj�4j�
390
W
385 UJI
/
,/
I
I
j STA0Ex 97
Ill 390.7:
EA STA 0`�SD
!E 390.e_
f)
i
�.
385
W
Ll!
12' SS i� 0.0022
�
380 0
If—
f'
3
1 f
380
+
I
5• SS � 0.0209
/�r1 .� -
L`d� �
375 W
I
375
IN
Q
370
370
ss p c,.w,55
(
—
w
w
w': �—
365
365
-f
0
1
.o
�n .z azz
360
STA 5+00
STA 4+50 STA 4+00 STA 3+50 STA 3+00
STA 2+50 STA 2+00 STA 1+50 STA 1+00 STA 0+50
PROFILE
STA 0+00
N M.O
41P d • ASS,
SCALE: HORIZ:1•=20'VERT:1• S' PRELIMINARY —
FILE: 8235CD0-C 100
CITY OF EAST RENTON
TWO
30% DESIGN SUBMITTAL
LIFT STATION - nPRa2o10
6�
ELIMINATION
BURIED UTILITIES IN AREA e`tif�s'"
PLEASE CALL BEFORE YOU DIG ��oN4L �''
RENTON
N� DATUM
O4°IIglac Planning/Bullding/Public Wod¢Dept PIPING PLAN AND
PROFILE - STA 0+00 - STA 5+00 6-03
I.BM.424.5555 NO.
REVISION BY DATE APPR
4
I
1
i
I
i
?
I
�
I
I
i
�
I
SEE SHEET C-04
— —
—
i
F-
— — — — — —
I
I
BRIAR HILLS
+
!
No. 4
w
I+
—I---
-----
140LnPL SE
_
I
I
m
I
T
'
I
�
I
z
u
SEE SHEET C-04
I
5;5<
of
BURIED UTILITIES IN AREA
PLEASE CALL BEFORE YOU DIG
1.800.424.5555
st __ �twElf-
C4S
S � a
R Z
a
WETLANDS (1
NO. I REVISION
/,(�I � GD5
4/1
SEE SHEET C-03
— — — — — — — — — — — — — — — — — — — — — —
I
I/ 2 tsss P
STREPIM
no
—�— 2+50
�� DATUM
GENERAL NOTES:
A. INSTALL BURIED PIPE IN ACCORDANCE WITH CITY
STANDARD PLAN 405. BACKFILL IN ACCORDANCE WITH
THE SPECIFICATIONS. COMPACT TO 95% MDO PER ASTM
D1557.
PARKSIDE
COURT
KEY NOTES:
_ _ _ _ _
MINIMUM BEND RADIUS = 370 FEET ALONG ANY POINT OF
— .—..—..—..—..
O
PIPELINE ALIGNMENT.
c+---•
I 2
DIAMETER IS NO PIIAES
—PE.DMER3IP-EUNE—.
? I
_�NSID�E
MATERIAL SH L US"BE F ED (NO JOINTS, LEAK FREE) PVC
I
OR FUSED HOPE TFTTHE`�
—�—
I 1 I
' O
SPECIFICATIONS. /
DETAIL PROVIDED FOR BYPASS PUMPING PURPOSES.
( I I
//'
STORi,R:'ATER
DETENTI&N
POND
f
t I
€ II
S
4r-
E,S T 2NT 0
MAPLEWOOD i
+ ESTATES
I
L
PRELIMINARY - 30% DESIGN SUBMITTAL
CITY OF EAST RENTON LIFT STATION - APRIL2010
RENTON ELIMINATION
Planning/ BuilCing/PuNic W°A6 DepL YARD PIPING KEY PLAN 6-02
CP #9
635D-10'9R/C
I N = 177613-380
! E = 1316607.095
' ELEV = 381.17
v=lriaze.ai ,
= 131676d-41
BRIAR HILLS
i No.4
CP #14 - BRASS DISC W/ PUNCH
N = 17 1.14MIC
N = 31680'113
7437
E = 116801.107
ELEV. (TYP) /\
(DWN: 0.37.3�
1 _ I _-148th PL SE _
I _
(TYP) 4
N = 177426.96 CP #11
o' E = 1316844.17 635D-11.11MNIW
m N = 177587.910
i E - 1316805.9
ELEV = 375:71` _
III
I
3 I �
CP #6
635D-10.6R/C
N = 177801.336
E - 1316600.520
ELEV = 381.31
LIMITS OF CONSTRUCTION
� •1
CP#12
/ / �63511.12MNIW
N = 177869.529
E- =,3161381..
ELEV =380.72
63513-10.9111C
N = 177717.766
E = 1316745.522
ELEV =378.22
'
1 '^ss
rC''.a2`�'a�.
a'._-.....
���
�c3.y�ds��xc� 'S�cc�'A�s
i♦�` O
BURIED UnUTIES IN AREA
PLEASE CALL BEFORE YOU DIG
1.600.424.5555
O
CP #23
635D-31.23R/C
N = 177787.655
E = 1316804.772 WETLANDS (1 .. ,
ELEV = 389.67
�()�I
vo
\ C N = 17828 15.5
1 /E - 7316495.55
CP 92 - BRASS DISC
635D-10.2MON
N = 178279.481
E = 1316508.089
CP 93 CP #8 CP #7 ELEV = 392.67
635D-10.3R/C 6350-10.8R/C 635D-10.7R/C (DWN:
N = 178036.852 N = 178111.131 N = 178210.086
1 E = 1316612-612 E = 1316613.559 E = 1316601:979
ELEV = 390.63 ELEV = 390.08 ELEV = 390.59
20'-0' MAX (TYP), MAPLEWOOD PARK O 15' SS
----- -----9 l_
2__-- �__�__-__- -- __- -:��
PARKSIDE
COURT
I
I N = 178349.58
1
n
I E = 1316495.86
I
STORt:1'rr!tTER
DETENTION
I FOtiL`
I
I
I
I
I
�3�
GENERAL NOTES: i
A. EXISTING SURVEY CONDUCTED MAY 2009 IDENT�,JES�
TREES 81NCHES DBH AND LARGER NOT ALL7TRE
SHRUBBERY ARE SHOWN. LIMITS OF WETLANDS AN�
STREAMS ARE APPROXIMATE.
B. ALL CONSTRUCTION ACTIVITIES SHALL AVOID DIRECT
WETLAND DISTURBANCE.
C. REPLACE ALL DISTURBED FENCING WITH LIKE KIND
REPLACEMENT.
D. EAST RENTON LIFT STATION SHALL REMAIN IN SERVICE
AT ALL TIMES THROUGH COMPLETION OF THE PROJECT.
E. LOCATION OF EXISTING UTILITIES SHOWN IS BASED ON
RECORD DRAWINGS AND FIELD LOCATES. ALL EXISTING
UTILITIES ARE SHOWN APPROXIMATE. CONTRACTOR
SHALL VERIFY THE LOCATION OF ALL EXISTING UTILITIES
AFFECTED BY THIS PROJECT PRIOR TO BEGINNING WORK.
F. CONTRACTOR SHALL MAINTAIN OPERATIONS WITHIN THE
LIMBS OF CONSTRUCTION SHOWN ON THE PLANS.
G. ALL DISTURBED AREAS SHALL BE RESTORED TO EXISTING
CONDITIONS AT THE CONCLUSION OF THE PROJECT.
H. CONTRACTOR IS RESPONSIBLE FOR OBTAINING
REQUIRED PERMITS AND IMPLEMENTING EROSION
CONTROL MEASURES IN ACCORDANCE WITH KING
COUNTY AND CITY STANDARDS AND THESE PLANS AND
SPECIFICATIONS.
I. CONTRACTOR SHALL MAINTAIN ACCESS TO ALL AREAS OF
THE SITE FOR CITY PERSONNEL AT ALL TIMES.
J. CONTRACTOR SHALL PROVIDE TEMPORARY FENCING,
. GATES. AND LOCKS AS REQUIRED TO MAINTAIN SITE
SECURITY AND SAFETY AT ALL TIMES.
�
KEY NOTES:
p
OTERRAIN
EAST AND WEST OF SURVEY IS MAPLEW000
PARK AND IS HEAVILY FORESTED SIMILAR TO WHAT IS
EAST RENTON
SHOWN ON EXISTING SURVEY.
LIFT STATION
\
O
12 FOOT WIDE GRAVEL ACCESS ROAD FROM SE 2ND
' CP
COURT, RENTON, WA 98059.
�
635D-10.5RIC
O
LIMBS OF CONSTRUCTION TO FENCE LINE, UNLESS
N = 17b301.528
OTHERWISE INDICATED.
E=1316729.093
ELEV } 39521
O
LIMBS OF CONSTRUCTION TO CURB, UNLESS OTHERWISE
INDICATED.
�CONSTR CTIUCTIU ON
O
LIMBS OF CONSTRUCTION TO EDGE OF GRAVEL ROAD,
STAGING
UNLESS OTHERWISE INDICATED.
r - -� i N. (T`
O 1
t
O CP#20%`
I J
i 635D-20RIC ^9U 1
�C r� 8162209
E = 1316812.623 T i
J ELEV = 389.00 qq I I j!
CP #22 �y i
635D-31.22RIC 1 T 39h i1 .1
N = 177955.496
ELEV 3882,34.T21 ; � ` ' I '
.78
1 i
MAPLEWOOD PARK O O
5
E 1316824.76
f I 2 A
PLAN
-. �`-
Tn !� i -7
-, PRELIMINARY- 30% DESIGN SUBMITTAL
�� s CITY OF EAST RENTON LIFT STATION APRIL2010
TJW � RENTON ELIMINATION
HM
BMO Planning/Building/Public Works Dept SITE PLAN, CONSTRUCTION LIMITS, ACCESS C-01
By DATE APPR �- AND STAGING
295.
NO. REVISION
FILE:
N =178
- N = 178313.33
� E =`1316825.39
�-�•.'-�--e.w.>...
t
,�iw�! }'lti: _f.. r'�., 1 -t. S �'
635D-10.4RIC
MAPLEWOOD
N = 176309.163�
ESTATES
E=131684fi.654
ELEV=401.80
L
�6'FEt.CE TYP)
a'°
EAST RENTON LIFT STATION ELIMINATION PROJECT
CONSTRUCTION SCHEDULE
PRELIMINARY - 30% DESIGN SUBMITTAL
Task Name Duration Start Finish March I April I May I June JUIV Auqust September October
EAST RENTON LIFT STATION ELIMINATION PROJECT 1155days; TueNfflt Mon 10/3/11
--- - -- - ------- --
Bid Period 65 days�' TueNl/lf Mon 5/30/111
----- ---- ---- -- i
Tu X i / 1 -1 M-
Advertise. for Bids 20 days--------- on 3/28/11
— ---------- -
Pre -Bid Walk Through 10 days:;: Tue3/29/11! Mon4/11/11
Bid Opening 15 days; Tue 4/12/11:: Mon 5/2/11
Award Contract 15 days Tue 5/3/11: Mon 5/23/11
NTP 5 days; Tue 5/24/11; Mon 5/30/11
Submittals 20 daysTue 5/31111 Mon 6/27111
Material Delivery 10 days; Tue 6/21 /11; Mon 7/4/11
- ------- --
Mobilization 10 days;i Tue 6/21 /111 Mon 7/4/11
------- --- Install 15" SS in 148th Place SE (STA 8+58 to STA 10+31) 14 days'. Tue 715/11 Fri 7/22/11
Remove Existing 8" SS 5 days' Tue 7/5/11 Mon 7/11/11
Install 173 LF of 15" SS 5 days! Tue 7/12/11 Mon 7118/11
-- ------ - -
Pipeline Testing 1 clayTue 7/19/111 Tue 7/19/11
Site Restoration Improvements 3 dayss, Wed 7/20/11; Fri 7/22/11
.......... ... ..
Install 15" SS through Maplewood Park (STA 0+76 to STA 8+58) 26daysi Mon7/25/11: Mon8/29/11
10 days, Mon 7/25/1 V Fri 8/5/11
Clearing wide path, 782-LE)-,--'z
------- ------ ------- - — ------ -- -
Fuse, n staT782 LF o15" SS 10 days; Mon 8/8/111 Fri 8/19/11
f
Stream Diversion 3 days:: Tue 8/16/11 Thu 8/18/11
Pipeline Testing 1 clay: Mon 8/22/11 Mon 8/22/11
Site Restoration Improvements 5-day's: Tue 8/23/111 Mon 8/29/11
Install 12" SS near existing lift station (STA 0+00 to 0+76) 25 days: Tue 8/30/11 Mon 10/3/111
-- -------- -
Install 76 LF of 12" SS 2 days Tue 8/30/11 Wed 8/31/11
Install - - - — - Temporary ---------------B-y---p-a--s--s—Pumping Systems 2 da s' Thu 9/1/11, Fri 9/2/11
sj Fill MH 5314 080 and MH 5314 079 with Concrete, Allow to Cure 15 da s: Mon 9/5/11 Fri 9/23/11
----- -------- - -- ------ ---- 3da s,
Make Final Sewer Connections to Manholes 1 day, Mon 9/26/11 Mon 9/26/11
--- - --- ------ - ----- ------- --
Pipeline Testing 1da: Tue,9/27/11. Tue9/27/11
---- ------ —
Confirm Operation of New Sewer Pipeline, Decommission Bypass Pumping Syste s 1 Wed 9/28/11 Wed 9/28/11
------------
Site Restoration Improvements 3days. Thu9/29/11 Mon 10/3/11
Project Completion Odaysi, Mon 10/3/11 Mon 10/3/11
( V .1--, -1;� Lc%� Lj-).Ay
4
pbr
Project: East Renton Lift Station Elimir I Task Progress Summary Ex Jardal asks D Deadline
Date: Thu 4/29/10 Split Milestone p Project Summary -ExTerna Milestone ��
Page 1
EAST RENTON LIFT STATION ELIMINATION PROJECT
CONSTRUCTION SCHEDULE
PRELIMINARY - 30% DESIGN SUBMITTAL
Task Name Duration Start Finish March April May June Jul August September October
_ E B M E B M E_ B M E B I M I E B M E I B I M E I B I M I E B M_
EAST RENTON LIFT STATION ELIMINATION PROJECT 155 days Tue 3/1H1 Mon 10/3111
Bid Period 65 days Tue 3/1/11 Mon 5/30/11
Advertise for Bids 20 days Tue 3/1/11 Mon 3/28/11
Pre -Bid Walk Through 10 days Tue 3/29/11 Mon 4/11/11
Bid Opening 15 days Tue 4/12/11 Mon 5/2/11
Award Contract 15 days Tue 5/3/11 Mon 5/23/11
NTP 5 days Tue 5/24/11 Mon 5/30/11 _
Submittals 20 days Tue 5/31/11 Mon 6/27/11
Material Delivery 10 days Tue 6/21/11 Mon 7/4/11
Mobilization 10 days Tue 6/21/11 Mon 7/4/11
Install 15" SS in 148th Place SE (STA 8+58 to STA 10+31) 14 days Tue 7/5/11 Fri 7/22/11
Remove Existing 8" SS .4f✓ 4 ` 5 days Tue 7/5/11 Mon 7/11/11
Install 173 LF of 15" SS C— 5 days Tue 7/12/11 Mon 7/18/11
Pipeline Testing 1 day Tue 7/19/11 Tue 7/19/11
Site Restoration Improvements 3 days Wed 7/20/11 Fri 7/22/11
Install 15" SS through Maplewood Park (STA 0+76 to STA 8+58) 26 days Mon 7/25/11 Mon 8129/11
Clearing � wide path, 782 LF) `tE, 7 10 days Mon 7125/11 Fri 8/5/11
Fuse and`I15st'all 782 LF of 15" SS 10 days Mon 8/8/11 Fri 8/19/11
Stream Diversion 3 days Tue 8/16/11 Thu 8/18/11
Pipeline Testing 1 day Mon 8/22/11 Mon 8/22/11
Site Restoration Improvements 5 days Tue 8/23/11 Mon 8/29/11
Install 12" SS near existing lift station (STA 0+00 to 0+76) 25 days Tue 8/30/11 Mon 10/3/11
Install 76 LF of 12" SS 2 days Tue 8/30/11 Wed 8/31/11 F
Install Temporary Bypass Pumping Systems Ild
Thu 9/1/11 Fri 9/2/11,
Fill MH 5314 080 and MH 5314 079 with Concrete, Allow to Cure Mon 9/5/11 Fri 9/23/11
Make Final Sewer Connections to Manholes Mon 9/26/11 Mon 9/26/11
Pipeline Testing Tue 9/27/11 Tue 9/27/11Confirm Operation of New Sewer Pipeline, Decommission Bypass Pumping SystemsWed 9/28/11 Wed 9/28/11
Site Restoration Improvements 3 days Thu 9/29/11 Mon 10/3/11
Project Completion 0 days Mon 10/3/11 Mon 10/3/11 ♦ 10/3
Lou,, Ar WAqf, �Iv M41, 'zr,- Gt.c6,f- 'zL{..
ao l eaC 6 1 Z4 6k-)
LAOrt;w_
J;4C'_ t.41.4xrr
Project: East Renton Lift Station Elimir Task Progress Summary E I asks _ Deadline 3
Date: Thu 4/29/10 Split Milestone Project Summary rna Milestone
Page 1
R
LAKE
WASHINGTON
Muiwapai
4
ANW
4
.I
s -• Esst ReAon
1,
"24tt 40
RertlOn
a Hptra�ps
�
��h9
1t
uc..wa cow Y
T
PROJECT SITE
wwe.00p t69
E
U};ape•Fa+wpop �'rvop OaN
S75 tar+►r C�.e
MAvle 7
�� �
���y,
767
e.-v� tii rt.-,o.ran �
1i�
7
i Gio.
REFERENCE: 2010
GOOGLE MAP
VICINITY MAP
NO SCALE
REFERENCE 2007 GOOGLE EARTH
LOCATION MAP
NO SCALE
[taro//c+
CITY OF RENTON
EAST RENTON LIFT STATION
ELIMINATION
PRELIMINARY - 30% DESIGN SUBMITTAL
PROJECT NO. WWP-27-3549
CITY OF RENTON
1055 SOUTH GRADY WAY
RENTON, WA 98057
The undersigned has approved this
document for and on behalf
of Carollo Engineers, P C
Partner
APRIL 2010
CONTACT PERSONNEL
DAVE CHRISTENSEN WASTEWATER UTILITY SUPERVISOR (425) 430-7212
A6
DRAWING LIST
SHEET NO.
DRAWING NO.
DESCRIPTION
1
G-01
COVER SHEET
2
G-02
GENERAL NOTES. ABBREVIATIONS, AND SYMBOLS
3
C-01
SITE PLAN, CONSTRUCTION LIMITS, ACCESS, AND STAGING
4
C-02
YARD PIPING KEY PLAN
5
C-03
PIPING PLAN AND PROFILE - STA 0-00 - STA 5+00
5
C-04
PIPING PLAN AND PROFILE - STA 5.00 - STA 1 D•31
7
C-05
MISCELLANEOUS DETAILS-1
PRELIMINARY - 30% DESIGN SUBMITTAL
BURIED UTImES IN AREA
RELSE CALL BEFORE YOU DIG
1.BO0A24.
GENERAL NOTES:
SURVEY LEGEND (EXISTING LINE WORK)
1. THE
CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE
STARTING
WORK
AND SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY DISCREPANCIES.
2. UNLESS
DETAILED, SPECIFIED, OR OTHERWISE INDICATED ON THE
k WATER VALVE
(j) MONUMENT NOT TIED THIS SURVEY
DRAWINGS, CONSTRUCTION SHALL BE AS INDICATED IN THE APPLICABLE
- - HYDRANT
Si'
TYPICAL
DETAILS AND GENERAL NOTES. TYPICAL DETAILS
SHALL APPLY
FIRE DEPT. CONNECTION
FOUND CASED MONUMENT
EVEN
THOUGH NOT REFERENCED AT SPECIFIC LOCATIONS
ON DRAWINGS.=(
WATER METER
,^; SET PK NAIUALUMINUM WASHER
3. WHERE NO CONSTRUCTION DETAILS ARE SHOWN OR NOTED FOR ANY PART
Y? POST INDICATOR VALVE
STAMPED "PACE CONTROL'
OF WORK, DETAILS SHALL BE THE SAME AS FOR OTHER SIMILAR WORK
r`) MANHOLES (SS/SD)
SET 5/8' IRON REBAR W/ YELLOW
— CB
PLASTIC CAP STAMPED L.S. #33130
{%- POWERAITILITY POLE
UNLESS OTHERWISE STATED.
ABBREVIATIONS
-- GUY ANCHOR
a JUNCTION BOX
AB
ANCHOR BOLT
ROR RAD
RADIUS
POWER TRANSFORMER
C
AGGREGATE BASE COURSE
D
REDUCER
T j POWER/TELEPHONE VAULT
AC
H
ASPHALTIC CONCRETE
REF
REFERENCE
_�
AFF
ABOVE FINISHED FLOOR
REINF
REINFORCE (D) (ING) (MENT)
�P•-_1 POWERMETER
CENTERLINES — — -
AHR
ALM
ANCHOR
ALARM
READ
REQUIRED
TELEPHONE/TV RISER
PROPERTY LINES ------ --
AL
ALUMINUM
S
SEWAGE
GAS VALVE
RIGHT-OF-WAY LINES ---- ---- ------
APPROX
APPROXIMATE
SCV
SWING CHECK VALVE
VALVE
GAS METER
EASEMENT LINES — - -- --- --
ASTM
AMERICAN SOCIETY OF TESTING AND MATERIALS
SD
STORM DRAIN
-_ '� STREET LIGHT
LOT LINES -- — ---- -
DITCH LINE ---- -----
AUTO
AVG
AUTOMATIC
AVERAGE
SIM
SPEC
SIMILAR
SPECIFICATION
�`
X SPOT ELEVATION
WATER LINE —--------
dal
AT
SS
SANITARY SEWER, GRAVITY
= SIGN
SANITARY SEWER LINE---------�—
SSFM
SANITARY SEWER FORCE MAIN
.- MAILBOX
STORM DRAIN LINE -----
BSP
BLACK STEEL PIPE
SSMH
SANITARY SEWER MANHOLE
ROCKERY
GAS LINE — --- --
SST
STAINLESS STEEL
UNDERGROUND POWER LINES--r-----
CA
CONCRETE ANCHOR
STA
STATION
:�. CONIFEROUS TREE
UNDERGROUND TELEPHONE LINES -
CB
CATCH BASIN
STD
STANDARD
i\,
UNDERGROUND CABLE TV LINES ----------^_-----
CHNL
CHANNEL
STL
STEEL
OVERHEAD UTILITY LINES+. ---
ci
CONSTRUCTION JOINT
S/W
SIDEWALK
,% DECIDUOUS TREE
CHAIN LINK FENCE------
CL OR
CENTERLINE
WIRE FENCE -- z ---- z ----- --
CUP
CONTROL PANEL
TDH
TOTAL DYNAMIC HEAD
FCV IRRIGATION CONTROL VALVE
WOOD FENCE -- --- --
CND
CONDUIT
TOC
TOP OF CONCRETE
CO
CLEANOUT
TYP
TYPICAL
COMP
COMPACTED
CONC
CONCRETE
V OR VLV
VALVE
CONN
CONNECTION
VERT
VERTICAL
CONSTR
CONSTRUCTION
VOL
VOLUME
CONT
CONTINUE (D) (OUS) OR CONTROL
BUILDING MATERIALS
CP
CONTROL POINT
W
WEST, WIDTH
CPLG
COUPLING
W/
WITH
W/o
WITHOUT
VIEW IN SECTION
D
DRAIN, DEPTH
DBH
DIAMETER BREAST HEIGHT
MATERIAL EXISTING
REMOVE NEW
DEG
DEGREE
DET
DIAOR
DETAIL
DIAMETER
CLASS "A"' "B", AND
'D'CONCRETE
DIM
DIMENSION
DIP
DUCTILE IRON PIPE
CLASS'C' CONCRETE
DWG
DRAWINGE
EA
EAST
EACH
STEEL
EL OR ELEV ELEVATION
ELEC
EMBED
ELECTRIC (AL)
EMBEDMENT
CAST IRON
i
ENGR
ENGINEER
FIBERGLASS
EOP
EQL
EDGE OF PAVEMENT
EQUAL
ALUMINUM
EQPT
EQUIPMENT
EXIST
EXISTING
SOIL
FLG
FLANGE��
FRP
FIBERGLASS REINFORCED PLASTIC
FT
FOOT, FEET
VIEW IN PLAN (NEW SHOWN - EXISTING SCREENED)
GIS
GEOGRAPHIC INFORMATION SYSTEMS
GRATING SPAN
PAVEMENT
HOPE
HIGH DENSITY POLYETHYLENE
-
ID
INSIDE DIAMETER OR INSIDE DIMENSION
OTHER
OTHER
NVT
INVERNVERT T
L
LENGTH
VIEW IN PLAN
LF
LINEAR FEET
EXISTING
MAX
MAXIMUM
MOD
MAXIMUM DRY DENSITY
WETLAND
MECH
MECHANICAL
MFRS
MANUFACTURER'S
MH
MANHOLE, SANITARY
MIN
MINIMUM
STREAM
MISC
MISCELLANEOUS
N
NORTH
NE
NORTH EAST
_
NO
NUMBER
NOM
NOMINAL
NTS
NOT TO SCALE
OD
OUTSIDE DIAMETER
PL
PROPERTYLINE
PNL
PANEL
PSI
POUND PER SQUARE INCH
PVC
POLYVINYL CHLORIDE
PVMT
PAVEMENT
ff(nfsmof
MECHANICAL LINE WORK
NEW OR EXISTING STRUCTURES
NEW OR EXISTING STRUCTURES HIDDEN
NEW PIPING (TRIPLE LINES)
NEW PIPING HIDDEN (TRIPLE LINES)
NEW PIPING (SINGLE LINE)
NEW PIPING HIDDEN (SINGLE LINE)
EXISTING PIPING (TRIPLE LINES)
EXISTING PIPING HIDDEN (TRIPLE LINES)
EXISTING PIPING (SINGLE LINE)
EXISTING PIPING HIDDEN (SINGLE LINE)
NEW EQUIPMENT OR PIPING CENTERLINE
EXISTING EQUIPMENT OR PIPING CENTERLINE
NEW EQUIPMENT
NEW EQUIPMENT HIDDEN
EXISTING EQUIPMENT
NEW FITTING
EXISTING TO BE REMOVED
NEW PIPING CALL -OUT
EXISTING PIPING CALL -OUT
DRAWING CROSS REFERENCE
DETAIL OR SECTION
NIDENTIFICATION
D-1
DETAIL OR SECTION TAKEN
ON THE SAME SHEET
DETAIL OR SECTION IS
TAKEN ON THE DRAWING
INDICATED
AT TITLE
TYPICAL DETAIL REFERENCE
BUBBLE
TYPICAL DETAIL NUMBER
IDENTIFICATION
DETAIL OR SECTION
IDENTIFICATION
DETAIL OR SECTION
REFERENCE BUBBLE
DETAIL OR SECTION IS TO BE
FOUND ON THE SAME SHEET
DETAIL OR SECTION IS TO
BE FOUND ON THE DRAWING
INDICATED
TYPICAL DETAIL IS TO BE
FOUND ON THE TYPICAL
DETAIL DRAWINGS
AT CROSS REFERENCE
PRELIMINARY - 30% DESIGN SUBMITTAL
BURIED UTILITIES IN AREA
PLEASE CALL BEFORE YOU DIG
1.800.424.5555
Li
his"
j �'} Lel PARKSIDE
RT'v�/ _ \/)VN = 17a282.36 COURT
��1/}/ �(/// E = 7376495.55
CP #2 - BRASS DISC I I
f 635D-10.2MON I i I N= 178349.58
j ( I I N= 778279.487 I i I E= 1316495.86
CP #6 CP #3 CP #8 CP #7 I1 I
( ELEV=392.67 444 2f:'.7A7tn
635D-t0.6R/C 635D-10.3R/C 635D-10.8R/C 635D-10.7R/C I I
(DWN: 1.3)
N = 177801.336 N = 178036.852 N = 178111.131 N = 178210.086 I i, I OE TEtiTCN
I E = 1316600.520 E = 1316612.612 E = 1316613.559 E = 1316601.979
ELEV=381.31 ELEV=390.63 ELEV-390.08 ELEV=390.59
LIMITS OF CONSTRUCTION 20'-0' MAX (TYP),-��
MAPLEWOOD PARK O 15' SS
�
t
CP #9
r
635D-10.9R/C
N = 177613.390
E = 1316607.095
i
ELEV = 381.17
N = 177429.47
.41
�(BRIAR
HILLS
No.4
- BRASS DISC W/ PUNCH
,14MIC437.113
F�N
6801.107
374.17 (fyP) 4.3')
- - ...._I _ '-- _ 146ih PL SE -- - -
I �
J 15" SS
I
++ (TYP) 4
I
1! N = 177426.96 CP #11
Lm E = 1316844.17 635D-11.11MNIW
7 r E = 1316805701
Ii y - - ELEV = 375.71
..-.._..-. ._.._.....
k
� � I
i
�m6Ca►e91
CP#12
/ � �635D-11.12MNAN
E = 1316685..7.
CP#10 ELEV=380.72�
635D-10.9RIC
N = 177717.766
E = 1316745.522
ELEV =378.22
r-
M
c
t
`9N
7
CP #23
g
635D-31.23RIC
N = I T7787.665
` E = 1316804.T72
l ELEV = 389,67
WETLANDS (TYP)
IV - - 5------ -----v
STREAM
CP #22
635D-31.22R/C
N = 177955.496
E = 1316824.221 U`
ELEV = 383.78
MAPLEWOOD PARK O
l
A PLAN
FILE: 8235C00C-100
/ //0' d CP #20
/� 635D-20R/C
09
f E E 1 .623 /
/ ELEVV= = 36389.00
B
O i
= 178295.50 +
= 1316824.76
I
3 IT
GENERAL NOTES:
A. EXISTING SURVEY CONDUCTED MAY 20D91DENT1FIE
TREES B INCHES DBH AND LARGER. NOT ALIiTREES
SHRUBBERY ARE SHOWN. LIMITS OF WETLANDS AN�
STREAMS ARE APPROXIMATE.
B. ALL CONSTRUCTION ACTIVITIES SHALL AVOID DIRECT
WETLAND DISTURBANCE.
C. REPLACE ALL DISTURBED FENCING WITH LIKE KIND
REPLACEMENT.
D. EAST RENTON LIFT STATION SHALL REMAIN IN SERVICE
AT ALL TIMES THROUGH COMPLETION OF THE PROJECT.
E. LOCATION OF EXISTING UTILITIES SHOWN IS BASED ON
RECORD DRAWINGS AND FIELD LOCATES. ALL EXISTING
UTILITIES ARE SHOWN APPROXIMATE. CONTRACTOR
SHALL VERIFY THE LOCATION OF ALL EXISTING UTILITIES
AFFECTED BY THIS PROJECT PRIOR TO BEGINNING WORK.
F. CONTRACTOR SHALL MAINTAIN OPERATIONS WITHIN THE
LIMITS OF CONSTRUCTION SHOWN ON THE PLANS.
G. ALL DISTURBED AREAS SHALL BE RESTORED TO EXISTING
CONDITIONS AT THE CONCLUSION OF THE PROJECT.
H. CONTRACTOR IS RESPONSIBLE FOR OBTAINING
REQUIRED PERMITS AND IMPLEMENTING EROSION
CONTROL MEASURES IN ACCORDANCE WITH KING
COUNTY AND CITY STANDARDS AND THESE PLANS AND
SPECIFICATIONS.
I. CONTRACTOR SHALL MAINTAIN ACCESS TO ALL AREAS OF
THE SITE FOR CITY PERSONNEL AT ALL TIMES.
J. CONTRACTOR SHALL PROVIDE TEMPORARY FENCING,
GATES, AND LOCKS AS REQUIRED TO MAINTAIN SITE
SECURITY AND SAFETY AT ALL TIMES.
y�
p �, ✓
O
KEY NOTES:
TERRAIN EAST AND WEST OF SURVEY IS MAPLEWOOD
PARK AND IS HEAVILY FORESTED SIMILAR TO WHAT IS
EAST ON
SHOWN ON EXISTING SURVEY.
LIFT STATION
O
12 FOOT WIDE GRAVEL ACCESS ROAD FROM SE 2ND
COURT, RENTON, WA 98059,
CP
635D-10.5R/C
O
LIMITS OF CONSTRUCTION TO FENCE LINE, UNLESS
N = 178301.528
OTHERWISE INDICATED.
E = 1316729.093
ELEV = 395.21
O
LIMITS OF CONSTRUCTION TO CURB, UNLESS OTHERWISE
INDICATED.
CONSTRUCTION
O5
LIMITS OF CONSTRUCTION TO EDGE OF GRAVEL ROAD,
STAGING )
UNLESS OTHERWISE INDICATED.
=�N = 178313 33 -0?--
E ='1316825.39
CP #4
MAPLEWOOD N = 178309.163 AM i
ESTATES E = 1316846.654
ELEV = 401.80 � . ` , 8,0 B� An'
+ � a�"
�.
I
b
8
PRELIMINARY - 30% DESIGN SUBMITTAL
BURIED UTILITIES IN AREA
PLEASE CALL BEFORE YOU DIG
1.800.424.5555
r.-
I SEE SHEET C-04
BRIAR HILLS
I No.4
— _ '.4 PLESE _
GENERAL NOTES:
A. INSTALL BURIED PIPE IN ACCORDANCE WITH CITY
STANDARD PLAN 405. BACKFILL IN ACCORDANCE WITH
THE SPECIFICATIONS. COMPACT TO 95% MDD PER ASTM
D1557.
3 A PARKSiDE
C-05 COURT KEY NOTES:
MINIMUM BEND RADIDS = 370 FEET ALONG ANY POINT OF
PIPELINE ALIGNMENT.
i % I 2 DIAMETER IS NO INSID PIPE DIAMETER..PIP-ELINE—.
SEE SHEET C-03 I MATERIAL SH L'UE FUSED (NO JOINTS, LEAK FREE) PVC
I OR FUSED HDPE ANCEWITH-TRIE—
1
SPECIFICATIONS.
bi I 3 DETAIL PROVIDED FOR BYPASS PUMPING PURPOSES.
I I STORMV.'ATFR {
I= DETENTSON I I
SEE SHEET C-04
— — — — — — — — —
5 �..►— 1,.4.Spy +11 j �4+00 34-Qi 3+50�-- y~3+00— -- Zh�—.--.-. 2t00 9'L" 1+SO ��1r� { •�
S,50 m "
_Tl'l 'r•"� �� 6.r�r.► 7(�`w�j e~9I 4
(bio
co
I � ��O �---9, i I / — -t .�—��€ — �t —%�'t� ` —� ��— � x ..{ — —m�! 1 � i O— — J { ��C�s� C'�L✓�
/ r! T
UF S :�N
1 � lb'
MAPLEWOOD
�¢) � ESTATES I
BURIED UTILITIES IN AREA
PLEASE CALL BEFORE YOU DIG
1.8W.424.5555
`PN M C9S
�1-
S
a
��70NAL
WETLANDS(-
NO. I REVISION
r
1 =4D•
�� DATUM
c 1p� 4 II
PRELIMINARY - 30% DESIGN SUBMITTAL
t3 CITY OF EAST RENTON LIFT STATION APRIL 2010
RENTON ELIMINATION
PlanningMullainyrPuDllcWorks Dept. YARD PIPING KEY PLAN C-OZ
GENERAL NOTES:
lf<' u k I IV-14
j _.'ATFR [�1 VV
�•�.•�
jS,�,
W POND KEY NOTES:
(��(� IEs.7
�ABANDON
�AND
PLUG �IN PLjC�.,"'
4A�d5C 2 ONCRE TE FILL�PO LOWESTPIPE INVERT ELEVATION.
-�.>r l j E-1S 3 3 F COVER ASSUMED. CONTRACTOR TO VERIFY.
, MH 5314 079
\ 8f3�CPd37WW,K2
..'",1i7S CF CJNS?RU^'!Ou _ Si E�,,.6
t cpf .1.3 STA 0+75.77
�_J
-�
[a1Jt8812811 e'8
` 6351N10.7RfG
, Na1:82i0.O86 I(
rn
cn 11,0
p l R41 t4+50 4+OOf D� 3+50 •'' - -_ ,a. 3+00
O 5 ..-. ��.. — , 4 e.-- � " -• __ —/.a- — -� — — — ` I ..._
14
//
,¢�jy`Iy' - 'i
. I
2-�5— �..� �. s.._ 2,00 ,34 1+50— 7�..1±00a ~ `ice I -- -
— — ":.l • d \ �=�--r-_._ ��-r •G �q{�69
rw
-e`�'.r __,.__.�c�. - ib i •I,4' 't;ta•,SC r•%11 f { \ j •,s ( V Yfj��1
2 % �3�1.35
xXfiFEP
94
-�{��,- / .
:4" _t 3+o-!-
cam'
,
111
m{ / / ��'
nY`..FEN61
�+ ,4'
I \ f
zz
/� 1Y:F}�115T'i•39D,:9 i -. <c ,`
c l
.': {':, �• 12-
t f �v �� N►•i
rG d
A
w /r r
/
rrjj++ 1 se
1 ' 2 SS t
i�
m
a /
' --- r z 20
T\3
` 1
MAPLEWOOD
t :;.,. '•. •� gig:.. -•.! iC'�
ESTATES
IP
MH53140110
STA 000.00 LAST RNiCNPLAN
LIF? STAT!CN
SCALE: 1' = 20'
FILE: 8235C00-C-100
424.23 LF
I
I
75.77 LF
395
I
APPROXIMATE EXIST GRAI
iE
_
395
390
i
--` --
f
390
j
EX 3�'SC
STAOF5E+
EX uT`SD
W
385 uJ
/�
i
i
;
IE 390Ji
!E 390.9:
385
Lll
380 00
'—�
f 3
I
15• SS
@ 0.0209
i
1
i
i
-
� i
i
2✓
7
„J
1
•1 � l� �
i�'�°'
1:.
f
�1
n�
380
375
_
t j
aw
375 zi
J
=
f
I
L)
370-_�
I
370
365
-
E
,
( —
T.
I
365
360
,
v z z _
C —_ 0
O
o- ._. z i
360
STA 5+00 STA 4+50 STA 4+00 STA 3+50 STA 3+00
STA 2+50 STA 2+00 STA 1+50 STA 1+00 STA 0+50 STA 0+00
PROFILE
M.CgS
�• F
�- A� �;'��f
%��Cp'r�w-
SCALE:HORIIZ�1"= 0'VERT:1•=6 PRELIMINARY - 30% DESIGN SUBMITTAL
,•_2a - F_,© CITY OF EAST RENTON LIFT STATION a APRIL2010
T� 7K RENTON ELIMINATION _
BURIED UTILITIES IN AREA �j��s�"
PLEASE CALL BEFORE YOU DIG 4fORAL'
,.800A24.5555 NO.
�oBaMC
�� DATUM PlannlngiBuileing/Puaic WOft Dept. PIPING PLAN AND PROFILE — STA 0+00 - STA 5+00 C-03
REVISION BY DATE APPR
L.I
�LF
X
z
0
GENERAL NOTES:
oot /, ,� Z— A.
zi ,
cpfB 0
A
IT
KEY NOTES:
"M
25' 25'
A-
1 3 FOOT COVER ASSUMED.
CONTRACTOR TO VERIFY.
E,�
E 52
BF —AR HU S
Z7
5+00
cn
IE
N-177437.113 Al-
15*SS
SDF CONS-RUC-ioN
m
m
(n
380
V
T
C*IW WkK
0
R 370+00
'21-57-
s315P20,110 7i
OAM
148th PL. SE 01 p # F-3735
30*CW
FUI-37560
L 396.28 F2
X-177W9,529
1-1316685-M
OZO=W32
MM5314090
STA 10+30.73
."
1V
5"SS
VA
10,
H 53 4 086 1
STA
1-1
RN-37393
rool(SW-371.73
8+58.41
*-I
E-I'ow'm
me
c4E
=4 M
CL Oft Ir PyC(KE)-3n03
A0#& Is- mloxs)-mm
c
VWi �
�
BMED rAs
PFVJNE
a
PLAN
SCALE: 1' = 20*
"S FILE: 8235COO-C-100
112.31
LF
250.00 U,
385
-4
I
j
385
C7
APPROXIMATE
EXISTING GRADE
380
380
APPROXIMATE
EXISTING GRADE
cl)
C?
375
F-
Lu 375
U)
ti
-SS@O
Lu
LIJ
370
370
o
to
wssdo-o"9
365
@FO:0149
cn
365
�J
017-
&15
-1-0- tmw
U-
w
41
360
tgrirka
,
Foj\,tw
t
w
A LU"W
LLI
e, jp:�
360
4
355
s
355
21
0
350
z z z
7, >>
z
350
STA 10+50 STA 10+00
STA 9+50 STA 9+00 STA 8+50 STA 8+00 PROFILE STA 7+50 STA 7+00
-SCALE:
STA 6+50 STA 6+00 STA 5+50 STA 5+00
HORIZ: 1"= 20'VERT: 1'= 6
M. c 415, FILE: 8235COO-C-100
PRELIMINARY - 30% DESIGN SUBMITTAL
"I!,
o
- —
1*=2(Y
Tjw
HPG
CITY OF EAST RENTON LIFT STATION "APRIL 2010
7K RENTON ELIMINATION
BURIED UT LMES IN AREA
I
PLEASE CALL BEFORE YOU DIG 't?ONAL
2
—smc I—
Planning/Building/Public Woft Dept. PIPING PLAN AND PROFLE —STA 5+00 -STA 10+31 C-04
4
1.800.424.&%5 NO. REVISION BY DATE APPR — —
a.
_ 07
A PLAN
C-02 SCALE: 1' = 20'
FILE: 8235C00-C-100
i
i
1 2 MH 5315135
I RIM EL = 398.043
g CL CHNL 42- PVC (N, E) = 386.391
I
t I f
1
S?OR:V.Y;ATER
_ I
MH 5314 078
RIM EL = 401.20
CL CHNL 12-(E, W) =30720
aw rl� Via- �4
of�,- �, I �-C"A-vm, L-6
tvp 1®
GENERAL NOTES:
A.
KEY NOTES:
tO ANTICIPATED MANHOLE USED FOR TEMPORARY BYPASS
PUMPING. COORDINATE ACCESS WITH CITY PERSONNEL.
2O LOCATION AND DATA FOR EXISTING MANHOLE IS
BASED ON CITY OF RENTON GIS DATA AND IS
APPROXIMATE.
PRELIMINARY - 30% DESIGN SUBMITTAL
BURIED UTILITIES IN AREA
PLEASE CALL BEFORE YOU DIG
1.800.424.5555
.Pf SU:PPJRT ( IF^
c� D• CR055
C �
F-
f ¢r
usM✓I
1 tY
Q
F-
Z
MOLv.� 7 C7VCR_ - Lo
,,D ;AU_7 30, OV AS APPRO::D
6Y a^r '.5D OSHA STANDARDS
WS7AL1 .7aR&PA7
0Y 6- S•TP.
v Y.E COVCry T VA: iE .A✓_ -
VAU
w � m E •1r--
e.-M _ `=
E
Y�
r�>g
Z 3�s5_
S
c
��gua
Q c
=1�a1
NW 1/4, NW 1/4, SEC. 14, TWP. 23 N., RGE. 5 E., W.M.
SOUP PUMF
S'F n'07£ 19 -�
6" m.,n0W TO 70'e EMERGENCY
.S7ORA(Y WELL
6" DISGIARC,C PIPING, GUIDE RAILS, LIFT
CHAIN, ETC FOR N7UR£ PUMP.
8 /N FROV 10'e LMLRCCNCY 5704AGE BELL 8" IN FROV
' I
N7VRf FL YOr 9UBMfR9BL£ PUMP AND Wf7M£CC
O
PIPING TO BE INSTALLED WIN N£(FSSARY
AS DICTA7fD BY OrY
24NCC CaIPLLtiC
111e PV; SCN
PROPoS£D CRAIF LANaNG PLAIFQ4M 107
80 VAUL I DRAIN
PS MIN. LOAD CAPACITY W7N H/NaT
O
_.
HATCH /N GY➢1'7fR .4c [YEAN/NG
00fR4170YS T0P TO A/811,17
CdJ7RAC
J
OE96Y TO CrY FOR APPROVAL PR104 70
8fG7WVW6 COWSTRUCRGV
-
UNIHO'SI REMMC SfffW
INSTALL 6" FZ
ar A
0V a5G7ARGE P[PC fOR FAP
FUTURE JRD PUMP
d pD j j
O
NS7ALL 1 f1 YGT SUDMLR93LE
PUMPS (YE NOTc J)
_
O
l
I
L ,NIHDIS7 RfCCIVNG
LG'✓G-
- -- -- -- - -
8' our TO
RE_ V•
PATTERN
R£flfS
µCTW2L
!r
(rrP)
.
—Tl'-8"x IlrB 11" B" GA If YAL V£
5' CYAUNIFFiCGYIT SWNG
Cafe: TV SCAB
CHECK VANE (Fl+R) (IYP )
SLF DETA2 SHE£7
CS JI
LNAMXV PIA IF ACCESS D002
\
39V• i 3 A9
H-10 (OADLNG RA]FD 8LLC0 TYPE
15'IN fRLW SSMH
3 9y. 87 A.B.
ToP ELEV--111+.e�/
.L)CP APPROKD ECVIAL, (T)PJ
Top EL
STAINLESS SIEEL UPPER GUIDE
PIPE •HANCYP.
BAR RAIL BRACKETS ATTACH 70
(AS RCON
112 a
CW4 70P RAB PER
2"e PIC SCN 60
STAINLESS
MANUFACTURE SPECYRCARONS.
VAUL I DRAIN
TOP Pi PE
70 CON7Ra ,\
Ba I
90e BEND (FL) PUMPS
L1..3 83 A.A
—FANcZ
Too PO PIP
EM 3@4.83A
!&7LWLY
PIPE SUPPORT
INSTALL 6" 911ND
(frp J)
IUn'CT 0%
TIBLR (.7A. r.
fa. HPUMP NO -
20Y
SUMP P/7 `-
1.e PV; SC7f 80
VAULT DRAW - -
__y' SIAWL_-13 57-lj-L C,A
C_CVS 97,VrS A7
30P. Fs05
1"e 5j G>JDe FA'C5 LTrP,i --
90TIO.0 OF VALVE JAU(7
SuUP PIPING, FL -I6J
5 G.I 0,SCNAR6C P,- (n )
INSIA1L FCF PUMPS : & 1
ON: r AI n45 RMT
B' DrRFiDW m w£;
3efd2 As
r�
y�
WIN =
TOP OF PunP3
4A96&
FL. 36%•68 A.B.
\tlll
364.78<
.�-
CONLRfT.E
C-ANn'EI!n'(, i0
.SI.C.r'f
a
H16H AM LOW Y£NIS
SEE DETAILS -9fLET
0,J4 (7)P.f
8' GA If VAL t•£
RISER
-- CCPRO-0N REYSTANT LADDER
MOUN70 TO CONCRETE LID
AND CRAUNG AS APPROWD
8Y CITY AND OSHA S7DS
EXTE14D 5TEN
AS NECE"AFLY�
— Pa lPROPYZ£NE SAFETY SIEP, -
ASSOC SAND & GRAVEL CO WC
OR APPROt0 EQUAL (TYP)
INSTAL( RBLRGRA7F LW
7OP 57EP
791O OF CRA77NG
EL. J84b 307.V3
5. 01'£RFZ OW
FRGU WC/WZL
IF 300.96
30.96 AF,
"WC MAIIHaf WIH —
RUBBFR GASKET •A'W775
ASSGCIA727D SAND & CRAVCL CO
INC. OR APPROVED FalAL
((:ROUT J91VIS IN90C AND
DUr(TIP)
o• r„4• U .uER W-,.71
ELdEi` 369.876.a
PUMP NO2 'ON'
EL. J70. 00 _._.
PUMP NO 1 01'
EL. J6900.—
° CA/i (70 1.3
WCi NCLLJ
WF7 NF/! 70.70A,
£L. J6607
W"7 )ICLL 90i70M
EL. #.G8 365.10
CAST J6 0 ACCESS NIO W RAB
INSTALL SID. LCaWC FRAM£ AND LID
39s-31 A.B.
7bP fLEV. _
iCP a LRARNC
L ""...'= 383-37 A.B.
S - 286 717
'COVED
FATE104 Ile
Kati ti .
�'Z•4-O::
ATOS I ABth Ave. N.E. Suife 700
'C® Bellevue. 11, A- 111 98001
DES IG N 4I5.885.7877 Fu AT5.8B5.7969
ENGINEERING PLANNING • SURVEYING
ASBU I LT
`, sc-NEI)SEP l3 e.�ja
e
NW 1/4, NW 1/4, SEC. 14,TWP. 23 N., RGE. 5 E., W.M.
2
Nq7A. 11*00, 1T,277
I T
W\\\
SYRFACE CLE"OJ
M111GA XN ARIA
\ - 1 \ - \? / ! '� / \� / / I I
R-1,V #Ili: ��r 55MH 4 7 A5509A 7ES PLANS
qo6.,S
-
57A. 2f84 R
216
-M---
ttf
0
2'11,, 11' 0 F6Rcr
MAW OE4N OUT r do
L , I '. 1 /,, -7
L,,..,IAII 50- T SfA 11*0J,
SEE Of TAlt 'WET TO CITY OF Rt
05.31
J
20' UnuTy
- - - - - - - - - - -
a_ Esm,r- Toictrrl
OF REIVralv
6.3, 21 _8
5 FA. r
V)
BRACT I
PARK
TFACT
SSW CP S FN PACE- A 0404 \ 7 Sr A,
SZ4
d
1
lips
!
MISSION
MINE
n 'mi-ismong
40mul
m
00 %------
KEY MAP
1" 500'
J4Lf
002
119
_416
-zoo I
4 F4
E
65
E�
0 r _21
eq .Vr
I I ;,� I 4XF 6
!Z 2b'.u71L17)�ANV,A= !mr 6 _�041'v _W E 406 1
7 fu ?075 71,;: ;, 0
o
L) 122 AA
D SI" a?NN, w1lu
AND ACCESS ENV TO i22
'3
164
CTY 6F REN)ZW 122r, -N
E 09204
5-
/f 404_g
20" STaw iR41N T 4070
ary cF,
a:Q /f 4010 00.1485 SCALE: 1 40'
AfNIGIN - z - 3, J7Lf i, __W5.6,LF_
12
! j .. e%� 1�. \\ . \F 4m. 0 410
J7LF 5' - - - - - - - - - - - - 0 20 40 8.0
'k L5
\STA 2, 167 r2 0 0.1215,1 0. 1115 EF=6
J, E 4050 c 4050 /c 405
\SrA. 64g L T 2.9 1 bd 0
12
17.2 BENCHMARK
-_z 0'o'jy5 16 2 WH 14;
169 1 170 17.1
J01 6 ��_ - - \ \ `\\ '\ ��_ _ \ \ \ ,o 1 (2 \E 40.1 a, BENCH MARKS PER CITY OF RENTON
I SURVEY ON NAVID 1988 DATUM
-j L -
;'a aoqA�, �F5164. L 7 7. 0' 1 157A. 4f< LF 6
P -BASST#1852 = 3
> DISC. IN THE INT.RNE 4THSURFACE ST. (S.E.
128TH ST.) & 148TH AVE S.E.
EL. 454.77 OR (138.614 METERS)
// '� 9 Gti /T\ \v�31LF B�\ '\ \\` PT#2103 = BROKEN . BRASS SURFACE
JR�LF
k'Ae2.51 1,4&F. 616 0 DISC: IN THE INT. S E. 128TH ST. &
n �%/ / //� \\ IN E 40a.0 cp,
j / // v� /,-a I 156TH AVE S.E.
r ifCF EL
.-Io 159 157 11 1 547.94 OR (167.013 METERS)
qv 41ZF 6' i'A&r a A.,, I
6 �kg
0 �.o 4&F 6'
0925 0 0. om 4.v 6 1
0:1 'E 402.5 i I /V a 0985
SEE LIFF S7A 7701V PLI, 404.0 E
4050
SHL-ET C5J2. TRACT H
\\\ v. �'�.� � --- --- - -� -_ ----- --`z-- -. t;
® sSTORM DRAINAGE
\� \\X\\ \ : '-' ", 00.1090 TO HOMEOWNERS T,_
_c
g -8 2-8- 45' BEND (mila) ASSOCIATIOW
; -, \ \' \\ 'I,' , .. � 09061 10'
W, 2-8- Wa-s (FZ-Md), 70 0.
A " --,- \ •I I I LOCI ff AS J_ -
'\ . -\ rr WNIUN..
Qo 8' CLEANO I \\\
SSW I A
UT
CCINC. BLOCKWC
V2 OB80
Z it
392
00.0815 1 005 .1 6', 8
0."
E 4W.0 29
jo
II
9 L- 4,v o 1 401.0 1 1 IF 40), o /L 0 �d
.0 T
130 '131, 1
132 33 1.34' 1E'(02'o 0 1,�n�
� ,
rn
Y.
5; < J �.f
4 1!
51
0
FUAIRL, S-WH t
�Z0 2 n < 72A v WuRi
Z0241FASW00 N 88'00'19."W 4-26-01
01. 2WR _,7
:01 . L� '. . . 12' WA 7ERMAIN
Oo,w SSW 2 1277.42
z
50 -01, 1 XA IE AS W#V I XA E AS ,S+IONN
<
J
O
41LIS 14111 Ave. 11,1, S,11, 1,10
z W.,h)�,, 98007
�25.885.7877 F 425,885.79e,3
ENGINEERING PLANNING SURVEYIN.G
p_2 SCANNED FEB15 2002 ASBUILT
z
- cv94168CS06
7
P
0 ,72LL 1% FR G S6
-%o
f o�
1X4
Op Y., 3 a E
E
E-
?a
_E
�mE
E
a�
h /7
L/FT S TA T/ON NOTES
1. THE- SAAOTARY .SEWER LIFT STA ZION SHALL BE CONSIRUC7ED AS SHOWN IN PLAN AND IN ACCORDANCE
WITH THESE S'ECIF7CA 17 WS AND 7H£ CITY OF RLW70N STANDARDS AND SPEWMA PONS
2. THE COWTRAC70R .SMALL SUBMIT TO THE CITY OF RENTON, AND THE OWNERS ENGINEER, FOUR (4) SETS
OF D£TAXED SHOP DRAWINGS M THE LIFT STA77ON. SHOP DRAWINGS SHALL INCLUDE DETAILS OF THE
FOLLOWING BUT SHALL NOT BE UMITED TO 7H£ FOLLOWING
I. MANHOLE CHAMBER BASE AND TOP S£CRON. 6. SIDE AWAY PUMP COUPLINGS
2. PUMPS WITH PERFORMANCE CURVES 7 1•UMP SLIDE RAILS
J. ELECTRICAL 600FUENT B VALVES PIPING AND FmwcS
4- ELECTRICAL MOTORS. 9. LADDERS
5 LIFT STATION ACCESS LID,
ACCEPTANCE FOR 4VSTALLA77ON OF THE PUMPING UNITS SHALL BE CONDNCENT UPON THE COMPLETENESS
OF THE ABOVE INFORMARON
THE CONTRACTOR SHALL PERFORM TESTS IN THE PRESENCE OF THE C17Y OF RENTON INSPEC77CIV AND THE
OWNERS ENGNEER 70 WERIFY COMPLETE COMPLIANCE W711 THESE DRAWINCS
.I THE CONTRACTOR SHALL FURNISH AND INSTALL AS SHOWN OW THE DRAWINGS 1i40 aYGT MODEL
CP-3152-454 WASTE WATER PUMPS OF THE SUBMERSIBLE; OUICK-DISCOWNECDON TYPE. EACH PUMP
SHALL HAVE A CAPACITY OF 510 GPM AT A TOTAL DYNAMIC HEAD OF IGO FEET. MOTORS SHALL BE NOT
LESS THAN 20 HP, 1750 RPM, 3 PHA5E 60 HZ 480 VOLTS PUMPS SHALL BE DESIGNED TO PASS NOT
LES5 THAN A 3 INCH DIAMETER SOLID. EACH PUMP IMPELLER SHALL BE TRIAIMED 70 THE EXACT FLOW
AND WAD OLWLNDOV AND OVERSIZED MO7ORS WILL NOT BE ACCEPTABLE U07ORS SHALL EACH 1NCLLUOE
40 FEET OF WA 7ERPROOF POWER CABLE AND SIGNAL CABLE W17H FACTORY -INSTALLED WA MR77GYHT
C13VN£C770VS STAINLESS STEEL CABLE SUPPORT GRIPS fWTH SINGLE U-EYE ROD, FOR EACH GROUP OF
MOTOR WIRES SHALL BE FURNISHED.
4. EACH PUMP SHALL HAVE A BASE MOUN771VG PLATE WIN QUICK DISCCWNECT DISCHARGE ELBOW, NOW
SPARKINC PUATP GUIDE BRACKET, AND GUIDE RAILS CONTRACTOR W U SUPPL Y STAINLESS CABLE (NYLON
COVERED ALL CABLE -WALL BE U.L. USTED) OF ADEQUATE CAPACITY AND LENGTH FOR RAISING AND
LOWERING PUMP -MOTOR ASSEMBLY. THE PUMP REMOVAL SYSTEM SHALL BE CON57RUCTED WIN STAINLESS
STEEL MATERIALS, INCLUDING GUIDE BRACKEIS AND RAILS
5 SEWAGE PUMP PIPING AND VALVES SHALL BE AS SHOWN SCHFAIARCALLY ON THE DRAWINGS PIPE
SHALL BE DUCTILE IRLW CONFORMING TO THE RfOIAREMENTS OF ANSI A21.50, APE WALL THICKNESS
SHALL BE AS REQUIRED FOR 7HICKNESS CLASS 50. PIPE FLANGES SHALL CONFORM 70 THE
REIXUKiEYENTS OF ANSI 816.1, CLASS 125. ALL PIPE PASSING THROUGH CONCRETE WALLS SHALL PASS
THROUGH A MECHANICAL JG'NT SLEEVEWINNEOPRENE GASKETS FLEA78LE COUPLINGS SHALL BE THE
GAWIM SLEEVE TYPE. COUPLINGS SHALL BE CENTERED ON THE PIPE JOINT AND PROPERTY ASSEMBLED
70 PROVIDE A WATER77GHT JOINT UNDER ALL CON01770NS OF EXPANSICK C0N7RAC770N AND AMECRO.N.
6. GA 7E VALVES SHALL BE RESILIENT SEAT GAT£ VALVES CONFORMING 70 THE 1.4 TEST AWWA STANDARD.
VALVES SHALL HAVE END TYPES AS NEEDED FOR INSTALLA77ON AND HA NOW -RISING STEM WIN
HANDWHEEL. CHECK VALVES SHALL BE SWING TYPE NON -SLAM fWTH BRONZE DISC AND SEAT RINGS AND
OU7SDE LEVER AND WE76HT5 VALVES SHALL BE EQUAL TO MOH. GATE VAL WES AND CHECK VAL VfS
SHALL BE FUSION HONED EPDXY COATED INSIDE AND OUT.
7. 57RUC77JRAL STEEL SHALL BE ASTM A36. FABR/CA770N SHALL BE IN ACCORDANCE WIN ACCEPTED
SHOP P RACOCES ALL JOINTS SHALL BE WELDED EXCEPT WHERE 07HER FASTENING ME7HODS ARE SHOWN
ON THE PLANS
B CHAIN LINK FENCE FABRIC SHALL BE NO. 9 WfRE SMOOTH KNUCKLE FINISH 70P AND BOTTOM. FABRIC
TO BE GALVANIZED. CORNER AND 1NTERMED/ATE POSTS - 2 7A INCH O.D. STANDARD PIPE, GA IF POSTS
- 4 INCH O.D. STANDARD PIPE. PROVIDE POST CAPS FOR ALL POSTS TOP RAIL - CON77NUOUS 1 518
INCH O.D. STANDARD PIPE SECURE FABRIC W7H WIRE CLIPS, 14 INCHES D.C. ON LINE POSTS 72 INCHES
0C CH RAILS AND TENSION WIRES SET POSTS 3' - 0" INTO CONCRETE FOOTINGS 9 INCH MINIMUM
DIAMETER 3= 4" DEEP. DRILL 118 INCH HOLE IN PIPE POST ,RUST ABOVE BASE. GA 7E 70 HAVE" HEAVY
PRESSED STEEL CONNECTIONS, HINGES AND LATCH. LATCH AND ACCEPT PADLOCK ALL 57FEL 7O BE
GAL VANIZED.
9. DUPLEX UOU19 LEVEL CON7ROL PANEL,' NEMA 3 R VANDAL PROOF, DOUBLE DOOR FACTORY WIRED AND
T£S7M PRESET ELECTRICAL CONTROL PANEL; IND1CA 77NC UG 17S AS REQUIRED, RELAYS; HOA;
COURINA 77ON STARTERS WIN QUICK- TRIP HEATERS,' PUMP AL 7ERNA 70R!5� TRANSDUCER LEVEL CONTROL/
SYSTEM; HOUR METERS AND AMP GAUGES FOR EACH PUMP.
10. POWER SERVICE TO PUMP STA 770N TO BE INSTALLED BY PUGET SOUND ENERGY. A RECEPTACLE SHALL
BE PROVIDED AT THE PUMP STA DON FOR CONNECTION TO 7HE CITY OF R£NTON5 PORTABLE GENERATOR
THE RECEPTACLE SHALL BE CROUSE HINDS AREA 10486.
11. CCN77?OL/LOGVC RfOU/REM£NTS ARE AS FOLLOWS'
A. WE7A£LL LEWEZ SHALL BE MEASURED USING A TRANSDUCER.
B. START AND STOP LEVEL FLOATS SHALL BE USED FOR BACK-UP CONTROL WITH A H16H
LEVEL FLOAT.
12 7HE FOLLOWING SHALL SE PERMANENTLY MOUNTED AT 771E PUMP STA77ON IN A LOCA770N APPROVED
BY 771E OWNER. PERMANENT Y ENGRAVED OPERA 77NG DIAGRAM OF THE CONTROL AND MECHANICAL
FEATURES INCLUDING WET WELL VOLUME PER FOOT, BASE ELEVA 7701H, OVERFLOW ELEVA DON, EMERGENCY
STORAGE LIMITED, PUMP OPERA 77NG SET POIN75 AND A HR/TTEN DESCRIP77ON OF PUMP OPERA 77ON
13. THE MOTOR STARTERS SHALL USE REDUCED VOL TACE SOLID STATE STARTER Wf7H MAGNETIC ONLY
CIRCUIT BREAKER PRO 7EC770% AND AN ABOVE STA7701V DISCONNECI.
14. CHECK VALVES SHALL HAVE LIMIT SWITCH SENSORS FOR POS177VE PUMP REPORT -BACK CAPABILITY.
15. COAT INSIDE WET WELL WITH A POL YUREA ELASTOMER: POL YSHIELD S5-100 OR EOUAL (COA 77NG TO
BE WH17£) COAT OUTSIDE OF WET WELL WITH 77VEMEC 46H-41J COAL TAR EPDXY.
16. ALL R 77NGS WITHIN WET WELL SHALL BE FLANGED EXCEPT WHERE NOTED ON PLANS PROVIDE
SHACKLE RODS AND HANGER SUPPORTS AS NEEDED. PIPING AND THRUST BCOCK/NG TO BE TEST TO
75LPS
77. CONCRETE SHALL BE PORTLAND CEMENT CONCRETE AND SHALL DEVELOP A MINIMUM COMPRESSIVE
STRENGTH OF JOOD PSI
18 ALL ELECTRICAL WIRING AND EOUIPMENT INSTALLED IN THE "WET WELL" SECTION MUST COMPLY WITH
AR77CLE 22 OF THE ELECTRICAL SAFETY ORDERS FOR CLASS 1, DIVISION 1, HAZARDOUS LOCA 77ON
PROVISIONS OF THE NATIONAL ELEC7RICAL CODE" AND ALL OTHER APPLICABLE LOCAL CODES AND
ORDINANCES A CITY OF RENTON ELECTRICAL PERMIT W)LL BE REOUIRED FOR THE LIFT STA 77ON W47RK.
19. ALL CONDUITS SHALL BE GALVANIZED RIGID CONDUIT WITH )TREADED HUB FIT77NGS AND BOXES.
CONDUIT ENTERING 771E WET WELL SHALL BE PVC COATED GRC INSIDE, AWD OUTSIDE
20. ALL ELEC7RICAL WIRE SHALL BE "7HWr COPPER CONDUCTOR OR APPROVED EQUAL.
21. ALL NUTS BOLTS AND WASHERS SHALL BE J04 SS/J/6 S5, NO EXCEPTIONS
22 AN OPERATIONS AND MAINTENANCE MANUAL SHALL BE SUPPLIED BY TH£ CONTRACTOR AFTER RENEW
AND APPROVAL BY THE CITY OF RENTON AND THE OWNER'S ENGINEER.
2J ALL FITTINGS VALVES PIPE, GUIDE RAILS, AND ELECTRICAL BOXES SHALL BE PROVIDED UNDER THIS
JOB FOR ACCEPTANCE OF A THIRD PUMP TO BE ADDED IN 7HE FUTURE 7HE ST4770N, WHEN COMPLETE,
SHALL BE ABLE TO ACCEPT THE PUMP WITHOUT ANY A00177ONS OR MODIFICAAONS TO THE STA ROM
NW 1/4, NW 1/4, SEC. 14, TWP. 23 N., RGE. 5 E., W.M.
LIFT S TA T/ON SITE PLAN
24. ACCESS HATCHES TO VAULT AND WF WELL SHALL BE DOUBLE ALUM/NUM DIAMOND PLATE ACCESS
DOOR EOUAL TO BLLCO TYPE ✓D, DOORS TO LOCK IN VER77CAL P0S7700V W17HOUT MOVEMENT, SPRING
ASSISTED OPENING H-20 LOAD RAZED, MILL FINISH, RECESSED HASP COVERED WIN HINGED LID. MOUNT
PER MANUFACTURES RECOMMENDA 77ONS. ALL HARDWARE AND FASTENERS SHALL BE TYPE 316 STAINLESS
STEEL. ROUTE 1 112" PVC DRAIN PIPE FROM FRAME TO BELOW INTERIOR GRA 77NG ENCNEERING
CALCULA 770NS SHALL BE PROWD£D 70 SUBSTANDA TE H-20 LOAD RA 77NG. PROVIDE ACCESS HATCHES WITH
TWO STAINLESS STEEL SAFETY CHAINS ON EACH MEN END. PROVIDE EACH CHAIN WTH ONE STAINLESS
STEEL CLEWS CRAP HOOK WITH SAFETY CUP FOR EASY REMOVAL
25. PROVIDE A POTABLE WATER SERVICE CONNECTION TO STA DON WfIH A 3/4-INCH'. HOSE BIB, 50 FEET
OF INDUSTRIAL GRADE HOSE, AND HOSE REEL WATER SERVICE SHALL MEET CITY OF RDV70N STANDARD
CONNEC7701V DETAILS AND HAVE A REDUCED PRESSURE BACKFLOW PREVENTOR ABOVE GRADE IN A HOT
BOX THE RP DEVICE SHALL BE WRAPPED IN ELECTRICAL HEAT TAPE A CFO RECEPTACLE SHALL BE
PROVIDED IN THE HOT BOX FOR POWER TO PRE HEAT TAPE
26. PROVIDE A TEE nTRNG ON 771E INFLUENT PIPE TO THE HE7WELL FOR DEFLECTING SEWAGE AWAY FROM
THE PUMP.
27 ALL MECHANICAL PIPING /N DRY VAULT SHALL BE PAINTED WITH 7NEMEC SERIES 66 HI -BUILD
EPDXOL/NE CITY TO CHOOSE COLOR.
18. 7HE ELECTRICAL ENCLOSURE STRUCTURE WILL CONTAIN THE FOLLOWING CONS7RUC77ON DETAILS
FOUNDATION: CONVENRONAL CONCRETE SPREAD FOOTING WITH 8" THICK STEM WALL
FLOORING: ONCE ALL OF THE CONDUITS ARE EXTENDED, A 4" THICK CONCRE7F SLAB WILL BE POURED
FRAMING.' THE BUILDING WILL BE WOOD FRAMED WITH 2,4 STUDS AND 2,6 ✓0157S
SIDING HARDI PLANK SIDING, 8" SLAB WITH 112 LAP.
ROOFING 25 YEAR COMPOS17701V ROOF.
PRIOR TO ACTUAL CONSTRUCTION, DETAILED PLANS WILL BE PREPARED AND SUBMITTED FOR CITY RENEW.
29. VALVE VAULT SUMP PUMP SHALL BE PACO PIP 702A OR APPROVED EOUAL WITH 1 1/2" COPPER GATF
VALVE, 1 112" COPPER SWING CHECK VALVE AND 1 112" COPPER UNION.
JD. PROVIDE EXTRA VALVE KEY TO BE STORED HA'SOE ELECTRICAL ENCLOSURE
1 "=10'
S.. qdb,&7j9
SCALE: 1" = 10�
0 5 10 20
-
-DESIGN
Com
v_.
ENGINEERING
.... _.....
ASBU I LT
1- 4-26-01 1
1-//-0/
4205 148ih Ave. N.E 5uire 200
Belle,�e, Wo hing- 96007
4258857877 Fay 42S.8857963
PLANNING • SURVEYING
9416SC532
SCANNED SEP 13 2002
ii
LAIC
A k
WASH04GTON
... W—Po
.z i.
,.
Remora
( '�o"iOs
PROJECT SM
My
AKYKJ .�-oW 1�nrv1 lil 111�
• ... if} ..af4
�un
W
� .j Q
�.
`HJIlt'
r..
f � atf 1 Ilq\
REFERENCE: 2010 GOOGLE MAP
VICINITY MAP
NO SCALE
woRT.i
REFERENCE: 2007 GOOGLE EARTH
LOCATION MAP
NO SCALE
4C CA,.o. #Alo%
CITY OF RENTON
EAST RENTON LIFT STATION
ELIMINATION
PRELIMINARY — 60% DESIGN SUBMITTAL
PROJECT NO. WWP-27-3549
DRAWING LIST
CITY OF RENTON
SHEET NO
DRAWING No.
DESCRIPTION
1
G-01
COVER SHEET
1055 SOUTH GRADY WAY
2
3
G-02
cat
GENERAL NOTES, CONSTRAITSAlD LEGENDS
EXISTING srcE AND CONSTRAINTS
4
C-02
TEMPORARY EROSION AND SEDIMENT CONTROL PLAN
5
C-04
ONPLAN
RENTON, WA 98057
6
C-04
SITEDEMAND
SITE AND PIPING PLAN
7
C-05
PIPING PLAN AND PROFILE - STA 0-00 • STA 5.00
6
C-06
PIPING PLAN AND PROFILE - STA 5.00 • STA 10.31
s
C-07
MISCELLANEOUS DETAILS - I
10
C-m
MLSCELLANEOUS DETAILS -I
11
L-01
BUFFER ENHANCEMENT t STREAM RESTORATION PLANTING PLAN t DETAILS
12
L-02
STREAMBAW PLANT SCHEDULE t LANDSCAPE DETAILS
The undersigned has approved this
document Tor and on behalf
O1 Carolo Engineers Washington P.C.
Partner
JUNE 2011
CONTACT PERSONNEL
DAVE CHRISTENSEN WASTEWATER UTILITY SUPERVISOR (425) 430-7212
PRELIMINARY - 30% DESIGN SUBMITTAL
BRED ,rriLnEs N AREA
PLEASE CALL BEFORE YOU DIG
' 907A24.5556
BUILDING MATERIALS
LINE WORK
DRAWING CROSS REFERENCE
1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE STARTING WORK
AND SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY DISCREPANCIES.
VIEW IN SECTION
NEW OR EXISTING STRUCTURES
-
2. UNLESS DETAILED, SPECIFIED, OR OTHERWISE INDICATED ON THE
MATERIAL EXISTING REMOVE NEW
DETAIL OR SECTION
DRAWINGS, CONSTRUCTION SHALL BE AS INDICATED IN THE APPLICABLE
NEW OR EXISTING STRUCNRES HIDDEN
IDENTIFICATION
TYPICAL DETAILS AND GENERAL NOTES. TYPICAL DETAILS SHALL APPLY
CONCRETE •'
EVEN THOUGH NOT REFERENCED AT SPECIFIC LOCATIONS
ON DRAWINGS.
7f
NEW PIPING (TRIPLE LINES)
— 0.1
3. WHERE NO CONSTRUCTION DETAILS ARE SHOWN OR NOTED FOR ANY PART
OF WORK, DETAILS SHALL BE THE SAME AS FOR OTHER SIMILAR WORK.
SOLI ���/���/ ��/ ��177
NEW PIPING HIDDEN (TRIPLE LINES)
— — — — — — —
DETAIL OR SECTION TAKEN
/
NEW PIPING (SINGLE LINE)
ON THE SAME SHEET
ABBREVIATIONS
VIEW IN PLAN (NEW SHOWN -EXISTING SCREENED)
NEW PIPING HIDDEN (SINGLE LINE)
- - - - - - -
DETAIL OR SECTION IS
AS
ABC
ANCHOR SOLT
AGGREGATE BASE COURSE
R OR RAD
RDCR
RADIUS
REDUCER
GRATING SPAN PAVEMENT
EXISTING PIPING (TRIPLE LINES)
TAKEN ON THE DRAWING
INDICATED
AC
ASPHALTIC CONCRETE
REF
REFERENCE
----
— _ _ _ _ —
AFF
ABOVE FINISHED FLOOR
RE
REINFORCE (D) (LNG) (MENT)
EXISTING PIPING HIDDEN (TRIPLE LINES) _ _ _ _ - _ _
AHR
ANCHOR
READQD
REQUIRED
AT TITLE
ALM
ALARM
OTHER
EXISTING PIPING (SINGLE LINE)
AL
ALUMINUM
5
SEWAGE OR SOUTH
APPROX
APPROXIMATE
SCV
SWING CHECK VALVE
EXISTING PIPING HIDDEN (SINGLE LINE) — — — — — — — TYPICAL DETAIL REFERENCE
ASTM
AMERICAN SOCIETY OF TESTING AND MATERIALS
SO
STORM DRAIN
VIEW IN PLAN
BUBBLE
AUTO
AUTOMATIC
SIM
SIMILAR
NEW EQUIPMENT OR PIPING CENTERLINE —
AVG
AVERAGE
SPEC
SPECIFICATION
EXISTING
TYPICAL DETAIL NUMBER
AT
SS
SSFM
SANITARY SEWER, GRAVITY
SANITARY SEWER FORCE MAIN
WETLAND
EXISTING EQUIPMENT OR PIPING CENTERLINE
IDENTIFICATION
BSP
BLACK STEEL PIPE
SSMH
SANITARY SEWER MANHOLE
SST
STAINLESS STEEL
NEW EQUIPMENT
DETAIL OR SECTION
CA
CONCRETEANCHOR
STA
STATION
IDENTIFICATION
CB
CATCH BASIN
STD
STANDARD
STREAM ®
NEW EQUIPMENT HIDDEN
— — — — — — —
p D11
CHNL
CHANNEL
STL
STEEL
T
C)
CONSTRUCTION JOINT
S/W
SIDEWALK
EXISTING EQUIPMENT
ETAIL OR SECTION
CLOR
CENTERLINE
SURVEY LEGEND (EXISTING LINE WORK)
REFERENCE BUBBLE
CLP
CONTROL PANEL
TOM
TOTAL DYNAMIC HEAD
NEW FITTING
CND
CONDUIT
TOC
TOP OF CONCRETE
CO
CLEANOUT
TYP
TYPE
DETAIL OR SECTION IS TO BE
COMP
COMPACTED
6; WATER VALVE (� MONUMENT NOT TIED THIS SURVEY
EXISTING TO BE REMOVED
FOUND ON THE SAME SHEET
CONC
CONCRETE
V OR VLV
VALVE
_ HYDRANT
COON
CONNECTION
VERT
VERTICAL
G FOUND CASED MONUMENT
FIRE DEPT. CONNECTION
NEW PIPING CALL -OUT
3' PW
DETAIL OR SECTION IS TO
BE FOUND ON THE DRAWING
CON STR
CONT
CONSTRUCTION
CONTINUE (D) (OUS) OR CONTROL
VOL
VOLUME
WATER METER a SET MAG NAIUALUMINUM WASHER
INDICATED
CP
CONTROL POINT
W
WEST, WIDTH
Ki POST INDICATOR VALVE STAMPED CONTROL'
EXISTING PIPING CALL -OUT
3' PN'
CPLG
COUPLING
W/
WITH
QS © MANHOLES (SSISD)
TYPICAL DETAIL IS TO BE
D
DRAIN, DEPTH
W/O
WITHOUT
OO SET 5B' IRON REBAR W/ RED
❑ CB PLASTIC CAP STAMPED *PACE CONTROL'
FOUND ON THE TYPICAL
DETAIL DRAWINGS
DBH
DIAMETER BREAST HEIGHT
-O- POWERAlTIL TY POLE UNLESS OTHERWISE STATED.
DEG
D
DEGREE
DETAIL
- 'ANCHOR SOLTEST PR
JUNCTION BOX
AT CROSS REFERENCE
DILA OR
DIM
DIAMETER
DIMENSION
POWER TRANSFORMER
DIP
DUCTILE IRON PIPE
I P ' j POWERRELEPHONE VAULT
DWG
DRAWING
CENTER LIES
OPM POWER METER CENTERLINES
E
EAST
❑ TELEPHONE/TV RISER PROPERTY LINES --- ----
-
EA
EACH
GAS VALVE RIGHT-OF-WAY LINES
,
EL OR ELEV ELEVATION
EASEMENT LINES — — -- — -- —
ELEC
ELECTRICAL)
GAS METER LOT LINES-— — -
EMBED
EMBEDMENT
O- -� STREET LIGHT DITCH LINE
SANITARY SEWER NOTES:
ENGR
ENGINEER
r SPOT ELEVATION WATER LINE
EDP
EDGE OF PAVEMENT
SIGN SANITARY SEWER LINE — ss
1.
THE HOURS OF WORK IN THE STREET RIGHT OF WAY SHALL BE PER CITY SPECIFICATIONS ON WEEKDAYS UNLESS OTHERWISE
EQL
EQUAL
MAILBOX STORM DRAM LINE a
APPROVED IN WRITING BY THE PLANNINGIBUILDINGMUBLIC WORKS DEPARTMENT. AN APPROVED TRAFFIC CONTROL PLAN MUST
EQPT
EQUIPMENT
SUBDIVISION LIES --- - - - - - --
BE OBTAINED PRIOR TO BEGINNING ANY WORK WITHIN PUBLIC RIGHT OF WAY.
EXIST
EXISTING
G ROCKERY GAS LINE -c
UNDERGROUND POWER LINES ____ _ _
—�
2.
ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO
FlG
FLANGE
CONIFEROUS TREE UNDERGROUND TELEPHONE LINES
VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE.
FRP
FIBERGLASS REINFORCED PLASTIC
^. UNDERGROUND POWER LINES/ -- wiu� ----
FT
FOOT, FEET
' DECIDUOUS TREE TELEPHONE LINES
3.
A PRECIO ONSTRUCTN CONFERENCE AND A 24 HOUR NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT
j
V
UNDERGROUND CABLE TV LIES -�.�
SHALL BE THE CONTRACTORS RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION.
GIS
GEOGRAPHIC INFORMATION SYSTEMS
OVERHEAD UTILITY LINES n
(INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON.) IT SHALL BE THE CONTRACTOR'S
ACV IRRIGATION CONTROL VALVE .
CHAIN LINK FENCE -- c - o -
RESPONSIBILITY TO NOTIFY THE PUBLIC WORKS INSPECTOR 24 HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION.
HOPE
HIGH DENSITY POLYETHYLENE
WINE FENCE , _
S DRIP LINE ' '
4
AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY
ID
INSIDE DIAMETER OR INSIDE DIMENSION
WOOD FENCE -- --- ---
OF WORKERS AND OTHERS ONOTNHE CONSTRUCTION SITE.METHODS
IE
INVERT ELEVATION
INVT
INVERT
5.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY OTHER RELATED PERMITS PRIOR TO
SURVEY NOTES:
ANY CONSTRUCTION.
L
LENGTH
LF
LINEAR FEET
6.
A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
HORIZONTAL DATUM:
MAX
MAXIMUM
NAD 83-01 BASED ON FOUND MONUMENTS WCCS 02932 (PACE CONTROL POINT 02)A CONCRETE MONUMENT
7.
ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED TO THE SATISFACTION OF THE
MOO
MAXIMUM DRY DENSITY
AT THE EAST QUARTER CORNER OF SECTION 14 AND WCCS #2900 (PACE CONTROL POINT #17) A 4-
DEPARTMENT FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION CA CONSTRUCTION.
MECH
MECHANICAL
CONCRETE MONUMENT IN A CASE AT THE INTERSECTION OF SE 142ND STREET AND 148TH PLACE SE.
MFRS
MANUFACTURERS
8.
IN UNIMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCHES AND MAXIMUM 12 INCHES ABOVE FINISHED GRADE OR MUST
MH
MANHOLE, SANITARY
VERTICAL DATUM:
HAVE MINIMUM 7 DIAMETER CONCRETE RING POURED AT GRADE. IN PAVED AREA, COVER MUST SLOPE IN ALL DIRECTIONS TO
MIN
MINIMUM
NAVD 88 BASED ON CITY OF RENTON BM TMENT212T BEING A FOUND ROUND CONCRETE MONUMENT IN A
MATCH PAVING.
MISC
MMLLANEOUS
CASE AT THE INTERSECTION OF SE 142ND STREET AND 149TH PLACE SE, (ELEVATION • 363.72 FEET).
N
NORTH
LEGAL DESCRIPTION:
'
NE
NORTH EAST
THE NORTH HALF OF THE NORTHEAST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 15, TOWNSHIP
NO
NUMBER
23 NORTH, RANGE 5 EAST, W.M., IN KING COUNTY, WASHINGTON: EXCEPT THE WEST 30 FEET THEREOF: AND
NOM
NOMINAL
THE NORTH HALF OF THE NORTHWEST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 14. TOWNSHIP
NTS
NOT TO SCALE
23 NORTH, RANGE 5 EAST, W JA., IN KING COUNTY WASHINGTON; EXCEPT THOSE PORTIONS OF SAID
.
SECTIONS 14 AND 15 HERETOFORE CONVEYED TO KING COUNTY BY DEED RECORDED UNDER RECORDING
OD
OUTSIDE DIAMETER
NUMBER 9401060SZ?
PL
PROPERTY LINE
PNL
PANEL
PSI
POUND PER SQUARE INCH
PVC
POLYVINYL CHLORIDE
PVMT
PAVEMENT
C�cafrlln
PRELIMINARY - 60% DESIGN SUBMITTAL
BURIED UTILITIES IN AREA
PLEASE GALL BEFORE YOU DOG,
IMOA24-W
I i I
I PARKSIDE
COURT GENERAL NOTES:
i I'll,
- 178282.36 I A. EXISTING SURVEY CONDUCTED MAY 2009 IDENTIFIES
0 I E • 131 A9553 E N • 178348.58 TREES 6INCHES DBH AND LARGER. NOT ALL TREES AND
•,31W95.86
CP C8 I SHRUBBERY ARE SHOWN. LIMITS OF WETLANDS AND
m I I ! ! CP 06 635D-10.BR/C _ _ STREAMS ARE APPROXIMATE.
I I 635D-10.6R/C N . 178111.131
N - 1771901335 E = 1316613559 r _ p- I B. ALL CONSTRUCTION ACTIVITIES SHALL AVOID DIRECT
I I E • 1316600.52D ELEV • 390A8 / / I \ I I STORMvr'ATER WETLAND DISTURBANCE.
ELEV s 381.31 - - CP 03 / ms i 1 \ i DETENTION C. REPLACE ALL DISTURBED FENCING WITH LIKE KIND
635D-10.3R/C N� N - 171 79.84 ) \ I POND REPLACEMENT.
I I / 20 PERMANENT E s 131661122 / CP 07
P E - 1316594.08
V CP ez -BRASS DISC D. EAST RENTON LIFT STATION SHALL REMAIN IN SERVICE
EASEMENT (TYP) / 6350.10.7R/C AT ALL TIMES THROUGH COMPLETION OF THE PROTECT.
I / N • 177929.79 \ ELEV • 390.63 N s 178210.066 I I 6350.102MON
/ E • 131Z96.21 \ / E - 1316601979 �t ) ) \ N-178279.481
\ MAPLEWOOD PAS O ELEV • 390.59 t`p I ELEV - 39267M E. LOCATION OF EXISTING UTILITIES SHOWN IS BASED ON
i I I RECORD DRAWINGS AND FIELD LOCATES. ALL EXISTING
�c . (, I (OWN: 1
/ y
�.,81j.�`,. Jtyt �C � / � UTILITIES ARE SHOWN APPROXIMATE. CONTRACTOR
I I / CONSTRUCLIMITSOY, '`* T * "30 7;( 4C ��-(] ___ 1 _- I SHALL VERIFY THE LOCATION OF ALL EXISTING UTILITIES
of
P) TPG �.� _ �' _ _ z t, r �j^ �Ll� �r / / _ •�-.- \ AFFECTED BY THIS PROTECT PRIOR TO BEGINNING WORK.
------ SHALL
WITHIN THE
I• I / l9e `"��' �°` i'C ' ITP,1\'�' •3'.�` ' " y�_ -m ✓ F LIMITS«CONSTRUCTION SHOWN ON THE PLANS.
' I CP CB / / _ --M_. v - 1.__---_- G. ALL DISTURBED ARE SS HALL BE RESTORED
HE PROJECT.TEXISTING
_ - "7//Iy- - - - -` - - - - - - - ALL DISTURBED AT AREAS SHALL BE RESTORED TO
10'CONSTRUCTIOI4 / F� ( H: •L•" ,_J 1 \ '
6350.t0.13M 380- I EASEMENT (TYP) / / / ' _ i w N • 177 7 : N...•+ l 1 /• -
N -177613380 ��( - % - ijo(,' cP Eu 13 662621 `:\ / i pig
/ / / \ N > �7 ;x ; k, H. CONTRACTOR TO MAINTAIN DRIVABLE ACCESS TO THE
E • 1316607.095 - _ / ,N �( t J �y .•,_ce:;< ..
ELEV • 381.17 - / / / CP C12 m 1 ` I
�cAI, I > \�• V VALVE VAULT EXISTING EAST RENTON LIFT STATION AND ACCESS TO ALL
- �� ��CC E � 131867AA0 1 \ OF ITS FACILITIES FOR CRY PERSONNEL AT ALL
1635611.12AWIW __ i .,.�;el`c;•;.:>:a: < .: Q / TIMES.
I `) r
N • 177669 S29
Ne17 4
/ 1
I
7429. 7
_ w
I
- % O
E 3 6685320 -
t T PR TEMPORARY FENCING / - L CONTRACTOR SHALL PROVIDE
E 3 6764A1 - �1,�
-ELE T BLDG �� I C
LEV • I E 380.72 c
�ri _ .. �T` T MAINTAIN SITE
_ W ' / GATES, AND LOCKS AS REQUIRED O _ ..
m O ,
6350.10.9RIC --% s- N � 1 1 ^ii?'•?`,i: e):h,':S�v.a' 1 �, O I SECURITY AND SAFETY AT ALL TIMES.
/ / / / N • 177717.766 '
BRIAR HILLS / / - �( : •��"�
/
RJ l 1 / 3 6 5.522 -
No. 4 / / / Ee71
ELEV . 37822-'" Q 4.:'f:>`;ie•'.,cz ,.. ayY..
CP C71 •BRASS //�
L '1' ` N • 17B289.76
/ , � 9 i
/ /
N / \ P ev�ir` f
DISC W/ PUNCH N
'w
/ l P \ / "!�,iev'.,`;:". N / q E • 1316727.70
m
r1 ,r 6 11 11 0 350- MIC
N • t7780291 m
w
N
Ns1774 711 1 3 3 / Iasi?c?; c<x" P
9 t�1 2
.1 1 m1
(TY )
E 3 6 B
O
_ a
Es131 11 7 /
o /
t
680 0
ELEV - 74 17
i
1
3
1196,
/
/
�► � 1
WART R STE C EEK
-
� (TYP)_ 1
I-
�i _ 4
I 1
- / I
I -
1
o /
'3
0
/
l
axe: d%r^
1
t \ /
461h \ SE
'y
R o \\ S E ACCESS
- - 8
TR6 •..+•7p 3 / .x»Ca.
r
:3
-
_
q
O O
O
/
I
C IRO
i
i
•t t 6 N 776 294
J / 6350.20R/C 9
i
i �/
!I i
• 1 1 E 3 6819.79 i N+97 1 B 62209
f I (TYP) E .,, ,2.623 /
- 368
4 1
i
1. I
1
ELEV
• 38.9.00
i i 1
R:n
l N • cl
1ne I - 1 2696 ,, 635D-3 .72WC 3t fa cone `�
I
8
I
� m
I
Iw
Est 1 77 3 6844.1 N - 7 955.198 /
PAD! A
W� I
1 m W V
I
w
E s 11316824221 ,o
5 � m 9 N
I I CP C11 ELEV s 383.78
635D-11.11MNANL�-
rn ,. 1 N177587910�M P MAPLEWOOD PARK -
- - E-1316805.701 \ 635DJ723R/C
ELEV - 375.71'�� N - 177787.655 /
E - 1316SO4.772 WETLANDS (TYP) .► /
ELEV • 389.67
UNINCORPORATED
KING COUNTY
W / / CITY OF RENTON
LIMITS
I KING COUNTY WETLAND AND STREAM BUFFER LIMITS
I \ / N - 178314AB
/ E •E 1317
_.._........ . A PLAN
.I I F0.E: 8235C00:>100
30 WATER
EASEMENT
IW.D. Iq
MAPLEWOOD PARK BOUNDARY
I
I
Q 6 J
PACE ENGINEERS, PC
au•c T,M' •omn��
o EAST RENTON
- WET
l / LIFT STATION
WELL FACILITY
i
L
- EMERGENCY
STORAGE TELL
N - 178321.61
- E - 1316728.10
KEY NOTES:
RAIN TER EAST AND WEST OF SURVEY IS MAPLEWOOD
/ PARK AND 6 HEAVILY FORESTED SIMILAR TO WHAT IS
SHOWN ON EXISTING SURVEY. MAPLEWOOD PARK IS AN
CP C5
INACTIVE PARK.
I
2
N s 178301528 LIMITS OF C CTpONSTRUN TO EDGE OF GRAVEL ROAD O
1 E- 1316729.093
UNLESS OTHERWISE INDICATED.
ELEV-39521
LIMITS CONSTRUCTION TO FENCE LINE UNLESS
I 3 L S OF ,
I CONTRACTOR
O
OTHERWISE INDICATED.
5
STAGING AREA
O1
LIMITS OF CONSTRUCTION TO CURB UNLESS OTHERWISE
INDICATED.
CP 94
l
6350.10.4RIC
' N - 178309.163 O CONTRACTOR STAGING AREA LIMBED TO EDGE OF
MAPLEWOOD GRAVEL DRIVE AND OTHER LIMBS AS INDICATED.
ESTATES EIEi-wtlm
I
I 6' FENCE (7YP)
1
1 .
1 CITY OF RENTON
I�
j N - 178329.69 / \
\ E - 131704235
---rj\
y \1FC
UTILITY AND ACCESS
\ EASEMENT TO CRY
F
OF RENTON
�
I
I
I ,
I
_ I
C3
PRELIMINARY - 60% DESIGN SUBMITTAL
BURIED UTUMS N ARFA
PLEASE CALL BEFORE YOU DIG
1.807.121.55%
I
_ ' ► I I
I I ► � I
► i ► I
► ► ( I / i 20• PERMANENT
/ EAS EMENT(TYP)
► I ► / / \ ---ODD PARK
I I LIMITS OF
► ► I / CONSTRUCTION m1`1J,� 7� J•,C ijt
I (i
►
►
►
►
l
I
f
lIi
W I
m
I� ►
it ►
► 7 �BI
► N = 177429.47
E=13 6676441 /
..—.._. _.._..—.._.._.._..I,C..—.. 37
BRIAR HILLS /
► No.4 �,///�11���`
► � SILT FENCE
/ 10'6Qgb CfT1IyOpN
EASEK7ENT�'ltld---
/ 1
/ I
/
/ 7
i
I� �11111111+�11� ���
N = 11C162,JO
E = 1316495.53
N�
B
/ 1 4 STREAM DEWATERING T
/ C48 RP
. y -
PARK
GENERAL NOTES:
COURTRT
N = 178349.58
A.
EXISTING SURVEY CONDUCTED MAY 2G09 IDENTIFIES
E - 1316495.86
TREES 6 INCHES DSH AND LARGER. NOT ALL TREES AND
SHRUBBERY ARE SHOWN. LIMITS OF WETLANDS AND
STREAMS ARE APPROXIMATE.
.-- -4
B.
ALL CONSTRUCTION ACTIVITIES SHALL AVOID DIRECT
WETLAND DISTURBANCE.
STORMWATER
\ I DETENTION
C.
REPLACE ALL DISTURBED FENCING WITH LIKE KIND
POND
REPLACEMENT.
v
D.
EAST RENTON LIFT STATION SHALL REMAIN IN SERVICE
I
AT ALL TIMES THROUGH COMPLETION OF THE PROJECT.
I
E
LOCATION OF EXISTING UTILITIES SHOWN IS BASED ON
I
RECORD DRAWINGS AND FIELD LOCATES. ALL EXISTING
\
UTILITIES ARE SHOWN APPROXIMATE. CONTRACTOR
SHALL VERIFY THE LOCATION OF ALL EXISTING UTILITIES
D
1
I
I 1
I
11
6 I
A
MAPLEWOOD PARK O
WETLANDS(TYP)
/ UNINCORPORATED_
T / / KING COUNTY /
/ CITY OF RENTON J
4 , / LIMITS
m
2 /
/ KING COUNTY WETLAND AND STREAM BUFFER LIMITS
o
/ N = 178314.46
EE=1317-
MAPLEWOOD PARK BOUNDARY
- -��_-
AFFECTED BY THIS PROJECT PRIOR TO BEGINNING WORK.
-
F.
CONTRACTOR SHALL MAINTAIN OPERATIONS WITHIN THE
m / - _ - - - =
3g 1
G.
LIMITS OF CONSTRUCTION SHOWN ON THE PLANS.
ALL DISTURBED AREAS SHALL BE RESTORED TO EXISTING
CONDITIONS AT THE CONCLUSION OF THE PROJECT.
PROTECT CATCH BASINS
H.
CONTRACTOR TO MAINTAIN DRIVABLE ACCESS TO THE
EXISTING EAST RENTON LIFT STATION AND ACCESS TO ALL
I
OF ITS FACASMS FOR CITE' PERSONNEL AT ALL
TIMES.
I
1.
CONTRACTOR SHALL PROVIDE TEMPORARY FENCING,
o ELECT BLDG
O ►
GATES, AND LOCKS AS REQUIRED TO MAINTAIN SITE
SECURITY AND SAFETY AT ALL TIMES.
J.
SEE DWG C-05 FOR ADDITIONAL STREAM DIVERSION
WET EAST RENTON
WELL / LIFT STATION
FACILITY
EMERGENCY /
K.
REQUIREMENTS.
PRIOR TO RELEASING THE STREAM BACK INTO THE
PROJECT AREA, ALL IN -STREAM AND BANK PROTECTION
STORAGE WELL
WORK SHALL BE COMPLETED.
N = 11
E = 1316728.16728.1� /
L.
UPON COMPLETION OF THE PROJECT, ALL MATERIAL USED
IN THE TEMPORARY STREAM DE -WATERING SYSTEM SHALL
BE REMOVED FROM THE SITE AND THE SITE IMPROVED IN
/
ACCORDANCE WITH SHEET L2.
/
KEY NOTES:
A TEMPORARY STREAM DE -WATERING SYSTEM
CONTRACTOR
SHALL BE IN PLACE TO DIVERT FLOW AROUND WORK
STAGING AREA
/
AREA PRIOR TO INITIATION OF OTHER WORK IN THE
WETLAND BUFFER.
7 SILT FENCE e
O
TEMPORARY COFFER DAMS SHALL BE INSTALLED AT
THE BYPASS INLET AND OUTLET AT A SUFFICIENT
SIZE AND SCALE TO DIVERT THE ENTIRE FLOW
MAPLEWOOD
THROUGH THE DE -WATERING SYSTEM.
ESTATES
6' FENCE (TYP)
1
I 1
I
1
1
1
CITY OF RENTON
1 .^
I
I N = 178329.69 / \
\ E = 1317042.35 /
UTILITY AND ACCESS
EASEMENT TO CITY
U��- OF RENTON
A � FILE:CAL; 1' 40'
FILE 6235COdC 100
30'WTER ECONSTRUCTNTRANCE ION1
EASEMENTA
I `` (\� \ e
W.D. 90 I � 7i /
BURIED UTILITIES IN AREA
PLEASE CALL BEFORE YOU DIG
I=A245555
a ►�
o�
PACE ENGINEERS. NC
1 e 60
NO.
REVISION
BY
DATE
APPR
PRELIMINARY - 60% DESIGN SUBMITTAL
0a CITY OF EAST RENTON LIFT STATION n JUNE2011
RENTON ELIMINATION
PknnIrgfBd InWPuC6cWuk6Dept. TEMPORARY EROSION AND SEDIMENT C-02
CONTROL PLAN
KING COUNTY WETLAND
I AND STREAM BUFFER - LIMITS OF `
LIMITS Cps 3, 25 EtT90.7
\i O'CONSTRUCTION 635D-1M.852 7R
N-17800.M/C
635D-10.7R C 411 �� �•�
1 EASEMENT (TYP) 6• I I E 13166IZ612 Y-178210.086 CP42-BRA.
1/ ) DE'f-390.6J E-1316601.979 635D-10.21
CONSTRUCTION(TYP.)' BEV-390.59 I N-,78279.'
14' , \ 1 I t � 6'DEC p I E-131662A
(p 11 �` Lp f�''1j••(1 8'CT90. (Dvm:ELEV-92E
n s , I I 6, `�fy �fu' 635[ 1p.6R/C I4 �o--�_�---o c p� (Bwc 1.J�
8 ` I \( �1J12• / ,,-{�N 74 � N.,7B7�,., 31 I, 'AR O,U'C77E,. I I 1B' 1 T: LL -- (.� �I'y--T-12'CIYO. _
VVV LLE--- i
12
=-=�--- 'RrM --- ;J, f�\� ;� rrA �v -C��` �/. 5 -__--�crvD.`- 4 Tp-i_ _
ot----------
`7 .
CASYAf6E72 --- YYER��- -
___
m `20' PE NENT EA$ MENT (TYP) -- - B 22' 14' )�✓
OC 1 T, O l 2
yy (yam,') :.'.,b,;i: Old RY-39S34 II fI{�I
' E 30 CPEP(M�390.79 Q i fl I
- �mot,, 11 ( )AI
?2 1
II
I
i
I
i
34'CIDM I •
I / P I
d
1 ( I
1
CD
6 I
1. � _ /' - I •'�' / ( 'I
- I
:W
_ (M
/
_ 01 p J II
,r
N / 4•
I
� y " (TYP)JI
12
IlIrMAPLE
/
1
I
24 20 I�
0
2D
/ • ,,r
- \ 1 2 10' SS
- o
,r It A�
9 21'YAPU? 3.::. 16
KING COUNTY WETLAND
I I AND STREAM BUFFER
LIMITS
S fORMWA1 ERGENERAL NOTES:
DETENTION MION
POND A. EXISTING SURVEY CONDUCTED MAY 20D9 IDENTIFIES TREES
6 INCHES DBH AND LARGER. CONTRACTOR TO REMOVE ALL
\ TREES AND SHRUBBERY WITHIN LIMITS OF CONSTRUCTION.
WHERE TREES AND SHRUBBERY EXTEND OUTSIDE OF LIMITS
DISC 12' SS I OF CONSTRUCTION REMOVE AS REQUIRED.
N
9 6 EXIST 60'0 MH 5314 079 B. EAST RENTON LIFT STATION FACILTY SHALL BE FENCED AT
ALL TIMES DURING CONSTRUCTION.
RIM EL - 395.92
INV IN - 364.17(W) C. CONTRACTOR TO MAINTAIN DRIVABLE ACCESS TO THE
INV OUT • 370.32(E) EXISTING EAST RENTON LIFT STATION AND ACCESS TO ALL
b o - o �-o - OF ITS FACILITIES FOR CITY PERSONNEL AT ALL TIMES.
' KEY NOTES:
TEMPORARILY REMOVE ROCKS TO FACILITATE ACCESS.
/ ® REPLACE AT COMPLETION OF CONSTRUCTION.
' OTEMPORARILY REMOVE FENCE TO FACILITATE
INSTALLATION OF SEWER. REPLACE AT COMPLETION OF
i 39 /; CONSTRUCTION.
V E-39,.35
30_CPEP O REMOVE AND REPLACE WITH NEW SS MH. SEE CIVIL DWGS
7 FOR DETAILS.
5 1"l.' SS O REMOVE B' SS AND INSTALL NEW SS. SEE CML DWGS FOR
DETAILS.
FILL 12' SS WITH SAND. ABANDON IN PLACE.
\I
6 SEE DWG C-05 O MODIFICATIONS.
W FOR UH M IF TIONS. REMOVE INSIDE
g
DROP CONNECTIONS PRIOR TO MH MODIFICATIONS.
L VALVE VAULT
7 REMOVE AND REPLACE MONUMENT PER CITY
O
ELECT BLDG STD PLAN HR-04, SLIM. EMEND CONC RING TO
�' GRADE, NO AC. MONUMENT SHALL BE LOCATED
AND REESTABLISHED BY A LICENSED
`+. MAPLEWOOD SURVEYOR.
ESTATES O
try 4 B AC PAVEMENT RESTORATION LIMITS. SAW CUT
MIN 1'-0' BEYOND EDGE OF TRENCH.
DECOMMISSION AND DEMO EXIST LIFT STATION
PER SUBSECTION 10.0173B AFTER SUBSTANTIAL
COMPLETION OF SEWER PIPELINE.
9
O 9 EAST RENTON LIFT STATION FACILITY
-r. WET WELL
-6 EXIST 6010 MH 5314 080 EMERGENCY STORAGE WELL
RIM EL-39491
INV IN - 369.716V)
INV IN - 384.56(E)
INV OUTh_269.7.1(N))
'y
/' ' (0 DIRT TR1l 1 `• -�= - (A
E D ow 24' � ,^� i _4 -J' - - -� m 0
�1 BRIAR HILLS
15' Ss
( /
SIY01 Pow374.12
IF 12'CIg%Q 370.52 ' CPn4-BRASS DISC wmwCH
E 12•CMP(v-389.62 63SD-11.14Y1C
E 30•CMP(N}369.02 N-177437.113 / / / / / K
E 30'CLIP(S)-36&92 E-1316801107
+� DE9-374.17 / 0
(DEN: 0.3)
LIMITS OF CONSTRUCTION (TYP) UNOERtRO�
c
00M) EAU( c 2'PEA P
�C 4 j Ef' SS 14- PL BE
JErdP3(75U}371.73
EXIST MH 5314 O90
RIM EL - 37453
INV IN - 365.03 (N,E,W)
INV OUT-365M (S)
< �: � c a rrlln dD
-- ROIlID
LONG EAIX `.
ten'
,111"11,110
\ Er1r.-37.71
DEV-SPiT
/ . R81-��37/5.60 `
/ E JD'C-r,N)•37(L35
E 30•UIP(S)-3M20
EXIST MH 5314 086
RIM EL-375.95
IF OUT-367.60(S)
A PLAN
FILE: 6235COD•c-100
r:.
m
e•-,e•O / / 1n m
MARE CLUSTER
I LIMITS OFF CONSTRUCTION (TYP)
/380- -
IrCEDAR
16
IYF12
10' CONSTRUCTION / I 6-MD-1NN-177869,/W
EASEMENT (TYP� �\ / / I E 1BFwIM322
20' PERMANENT EASEMENT (TYP)
CPr0 /
- 635D-10.9R/C / o
46
S TC BUPom GAS
/
/
/
PRELIMINARY - 60% DESIGN SUBMITTAL
BURIED U1Lrt1ES IN AREA
PLEASE CALL BEFORE YOU DIG
1NOA24.558
PARKSIDE
1 A i COURT GENERAL NOTES:
C-07 N • 178349 58 A. EXISTING SURVEY CONDUCTED MAY 2009 IDENTIFIES
N - t-78282-M — I --'— - E • 1316495.86 TREES EERY ARE
DBH AND LARGER. NOT ALL TREES AND
I I E • 1316495 53 SHRUBBERY ARE SHOWN. LIMITS OF WETLANDS AND
I i i STREAMS ARE APPROXIMATE.
-I- I B. ALL CONSTRUCTION ACTIVITIES SHALL AVOID DIRECT
I I / I \ I WETLAND DISTURBANCE.
MAPLEWOOD PARK / / SEE SHEET C-05 l 1 1 STORMWATER
— — — — — — — — — — —I— — 'T DETENTION C. REPLACE ALL DISTURBED FENCING WITH LIKE KIND
POND REPLACEMENT.
201 PERMANENT
EASEMENT(TYP) / i v I D. EAST RENTON LIFT STATION SHALL REMAIN IN SERVICE
j 1 AT ALL TIMES THROUGH COMPLETION OF THE PROJECT.
/ SEE SHEET, ,C-06 _ — / 1 B' SS I I I E. LOCATION OF EXISTING UTILITIES SHOWN IS BASED ON
�( _ _'/j,[\/ `\ O 1 RECORD DRAWINGS AND FIELD LOCATES. ALL EXISTING
ILITIES ARE
LIMrT
I I L CONSTRUCS� v '„�•`' ^J�'�..2.�K-T----- — - _.......
_ --_ I TES
$ O i I STHALL VERIFY THSHOWN
LOOCATIOJ OF ALL EXISTING UTILITIES
•, _- / I -(r• \ I AFFECTED BY THIS PROJECT PRIOR TO BEGINNING
% `(------- -- \ ----- _- -�\r a--v—'lam' __1�_-t +- � _ �.I _- 1 I WORK.
• _ _ _ ,� ' ' y - _ - F. CONTRACTOR SHALL MAINTAIN OPERATIONS WITH THE
_
12' LIMBS OF CONSTRUCTION SHOWN ON THE PUNS.
/ 10'CONSTRUCTION
I I /�380- EASE-MENT (TYP / / / /' \.� W N , -�__ % - / ♦ 1 1 '' - _ G. ALL DISTURBED AREAS SHALL BE RESTORED TO EXISTING
-3 I ,ia�- O - - ',p - CONDITIONS AT THE CONCLUSION OF THE PROJECT.
L VALVE
`VAULT I H. CONTRACTOR
EAST TO
AIN LIFT DRIVABLE
ACCESS TO THE
/ TO
ALL OF ITS FACILITIES FOR CITY PERSONNEL AT ALL
- 1 ELECT
- i C
• 1774 47
- I
28. TI
MES.
/ I - r.
I- a
/ 1 I-
- - - BLDG
Ee1316764A1 / / / / / ,_I' - ------
N :d%::,: bT
/I
- T - I L CONTRACTOR SHALL PROVIDE TEMPORARY
l � ' ` /'/ N Q I GATES, AND LOCKS AS RETAILED TO MAINTAIN SITE
SECURITY AND SAFETY AT ALL TIMER.
Q-
—
SEE SHEET � —
_ EAST RENTON
\ r,,t.: ;rah{.,?:
— � � � � � Y � / - / �+ O \ �`i5i:"�:�•.:<iTSo.� v � LIFT STATION J. INSTALL BURIED PIPE IN ACCORDANCE WITH CRY
' WET FACILITY STANDARD PLAN 105. BACKFILL PIPELINE BETWEEN
l WELL TA ' S 3e50 AND STA 8+59 WITH NATIVE MATERIAL. REMOVE
_ � 1
O
r�
L
/ N • 17 .76
/ J1 8289
AN 1 BRIAR H -(' ROCKS D OTHER DEBRIS INCHES AND LARGER.
ILLS ti r \ b I p EM RG NCY I w
q a \ E • 13t6727.70 /
/ r�"x:'"".'>: •arx"" / m ^� / "','� i STORAGE WELL COMPACT TO 92% MOD PER ASTM 01557. BACKFILL ALL
/ / 1 � � t N • 178321b1 OTHER PIPELINE WITH GRAVEL BORROW PER SECTION
fI / .� r ^, O �y / 11-03.14(1). COMPACT TO 1T5%MDD PER ASTM D1551.
e E • 131 728.10 1 6
I
I r
1
I :rr
;LLT WART R
1
y"S E C E EK 9\
I J
I
T I
"3
r o
/ I
\ I is PL Blh /
SE \ \
•
RAC OR Y NOT K - E ES:
- CONTRACTOR \ / CO
` X
13
i/
3
�`ir�': ;.`a':•�w; 'I
I
.� PO :.. • 0� /
'L
I STAGI
NG AREA
FOR BYPASS PUMPING PU
RPOSES.
ODETALPOED
I - T i q
n �
0 -
I �
— P
/ 0
O 1 I O ai i O �
'I /
I
I
f
15' SS
I
/
J i I
I
1 1
I
q I MAP W LE OOD
I
I \
T
/
A
1 /
A
�1
T TAT I ES ES
N • 177426.96 I 9
3 �i ,.r,.. conc B
YyYr., m
I Est 16844 17
I W
3 / I
+ PAD i
eP
1
1
,I w
I
m w
I
6' FENCE (TVP)
maxo
=l, iIF
WETLANDS
1 i \ �)
MAPLEWOOD PARK :[
\ I UNINCORPORATED 1 CITY OF RENTON
/ KING COUNTY \ 1
\ P / CITY OF RENTON
LIMITS�l I j N•178329.69 .� \
I \ E • 13,42 70% /
I\ / KING COUNTY WETLAND AND STREAM BUFFER LIAt1T5
UTILITY AND ACCESS
EAEMENT PLAN OF RENTON
TO CITY
y
._.._.._.._.._.._.._.
scALE: ,• • 4d i � o
I I - F0.E: 8235COPG700 I � /
30' WATER I 90� / •• y��
EASEMENT
IW.D. 90 I , 7 • /
MAPLEWOOD PARK BOUNDARY I
I I
I I
Icb
PRELIMINARY - 60% DESIGN SUBMITTAL
PACEENpNEERSNC 1••40•'-• CITY OF EAST RENTON LIFT STATION y1JUNEzo11
"'a`.M AMP Ft IMINATInN
BURIED UTILITIES IN AREA
PLEASE CALL BEFORE YOU DIG
1A0iA24.56%
(
GENERAL NOTES:
KING COUNTY WETLAND /
AND STREAM BUFFER
I i
\
A INSTALL BURIED PIPE IN ACCORDANCE WITH CITY
STANDARD PLAN 405. PPELE BETWEEN
MNATIVE
LIMITS /
WITH
STA 3+50 AND STA 8+59 WITH MATERIAL, REMOVE
ROCKS AND OTHER DEBRIS 4 INCHES AND LARGER.
STORMWATER
DETENTION
COMPACT TO 92%MOD PER ASTM 01557. BACKFILL ALL
OTHER PIPELINE WITH GRAVEL BORROW PER SECTION
�/3
i5 M.
I POND
F-390.7 B \
9.03.14(1). COMPACT TO 95%MOD PER ASTM D1557.
B. LIMIT HOPE BEND RADVJS TO A MIN OF TWICE MFR'S
\ 10'CONSTRUCTION
635D-10.3R/C
N-1786IZIII 114111 S OF CONSTRUCTION(TYP)
CP17
635D-107R/C
JO'CPE➢ I
RECOMMENDED SEND RADIUS.
EASEMENT (T'P) 6'
�� •_
'
14' 14
•6'
1 t
14
I li
I (i t
(p1 I �
`STA
-/ E-1J16812812
EIEY-39D.63
12'110ER 12'
14 �yn• [T�('.
�� %1j`
N.17821D.0e6 TEMPORARYCP
E-1316601.979 B
Ems'-3� CRT OS�SING
O C-07
BBC �C�.
.-
` I \
6350-1D2Y
1 MAN
E.t3t660& 1 C NELMG
F1EV-7926 C-07
KEY NOTES:
1 ABANDONED 17 SS.
'i
w\ I I .
lg• 1+62t'`. t2'
tY �•,j
S.I
,` 14 635D-4V'BR/C t CEDAR
,��+�yy�"-17}76611558 °
�-
14 c---c _ °
12'CTMD. O 10'C1M0.
°
-
(DMt t.J')
I
EXIST 80'0 MH 5314 079\
2 CONTRACTOR TO VERY DEPTH.
3 CORE DRILL AND CONNECT NEW SANITARY SEWER PIPING
12'
_ _ _ _
POC 0. _ -E� - _
°�
1.
o ° _ oTa�' o _
WITH KOR-NSEAL BOOT WITH SST CONNECTOR, OR EQUAL.
----
-A_
0T
O REMOVE MH CONE TO FACILITATE CONSTRUCTION
-�
_
AS REOD. REINSTALL TO MATCH EXISTING.
(n _ - _ _ r _ �� _
-r -+ -�
__ _ -�
_
_ 4-' 'G
_
��_-
`1�(5\
�) ®
�\ � -
-
_ �v _ --
,, D -
SEAL WATER TIGHT.ACTIVITIES
ALL IN -STREAM WORK WILL OCCUR DURING THE DRY
DRYAD
p
j 4+00 �\ '\
\ •
/ - = j _ 2�
3+50 ��� _�- 3+00 -'
4�;
2 JI 1+50
_" ��'`�� ��
5 .i' 3
L L\� �•- —
``
`` _I=
� ••
B _ 3 �4,
�r _ _ _ _
\ =
/ I -
I `� MONTHS AND UNDER THE SUPERVISION OF AHE
BIOLOGIST. CONTRACTOR SHALL OEWATER STREAM
CHANNEL AND DIVERT STREAM FLOWS AROUND WORK
r
m I1r
'
_ l
\
1 y�
16 / l"(. 14• 1'
v
(2)16'.Nl'O72
I -
(� r �- -
3 ,
AREA PRIOR TO ANY M-CHANNEL WORK. A COFFERDAM
CONSTRUCTED OF SAND BAGS OR SIMILAR MATERIAL
`
iT11 `20'PE ,ANENT EASEMENT(TYI
f
I,� 11 1
PbW I I;�A_
I
--_____ - / J IE-391.35
\ / /-' �y --- ,`� 22• 14' ` 1 I �m�'
_' '•I .• 30_CPEP
SHALL BE INSTALLED UPSTREAM AND DOWN STREAM OF
THE WORK AREA. STREAM FLOW SHALL BE PUMPED
_
m -37d (�
N
W 1 1 t; I
\ ?A /
I
11 1 / I: 30
I /y��
`%
`
l .'::::?c':::• '" ''Q:,
t
Gd RIM-J95.34
_ -
K
(�
I 6' -
AROUND THE WORK AREA AND DISCHARGED
DOWNSTREAM OF THE COFFERDAM. ANY SEEPAGE INTO
-1 �"831�
(�
\�
/
\ i \ 10
J
I
I IO 1
IL�(�
':. ':
r
:;•:'r;.':
W�
t II ENCE.'
O VALVE VAULT
O I !IY)
THE WORK AR EA SHALL BE PUMPED AND DISCHARGED
INTO THE DEWATERING DISCHARGE LOCATION. REMOVE
COFFERDAMS, PUMPS AND PfPING AT COMPLETION OF
22 } 22
74
I
WORK.
S/'CEDM I
�t / .
P
I A
CHANNEL PER CITY STD PLAN 400.1.
— ----
l i /
/ I
to
b 1 2
1r
I
INSTALL PHI WAT T HORIZONTALLY
7 5 ALL HYDRO LIC WATERSTOP
O
�' - -
_
_ i
W �`✓
- ��
/
-
' -
t
�(� ELECT
E E BLOG
I 3 1• ``
AROUND S DE FACE OF EXIST MH M 1r BELOW
O M 1 M MV
KA,
F ELM 2010MN BY ADE HYDR THE
K
CJ-0725J BY GREENSTREAK OR EQUAL. ADHERE
•- - •, !
! -
01 /
/ /
N / /
zo s'Y 20
O I
„`V�'` 1
616
J. am;
•
...
.'.'!;.':.":•'•':'::'.'::'�.;•'::; .'::.':.•:.'::...
F WAT R TOP T EXIST MH USING A SINGLE
16'' E S O EX
� � MAPLEWOOD COMPONENT WATER -SWELLING SEALANT ULTRA SEAL
c s
r •1 r N
P-201B ADE LFAIQAASTER LV B GREE STREAK
TAT KA
I ESTATES
OR EQUAL AFTER CONIC HAS TAKEN INITIAL SET, SEAL
O JOINT WITH SYNTHETIC RUBBERSEALING COMPOUND
SIKAFLEX 2c NS OR SL, OR EQUAL PER S188
�
:}F,:: ?::. �•�::'::::: •'�: •':::.'.': �. �'�: ✓: � :: •::.
WET WELL
PLAN
RENTON
EASTSTATION
SCALE: 1--201
EXIST 60'0 MH 5314 OIiO LIFTSTATION
STA 0+00M FACILITY
FILE: 8235COOL•100
424.23 LF
I
I
I
' 75.77 LF
I
m3
395
_ c
a
x
-
395
APPROXIMATE EXIST GRADE
N
x c'
W W
y
W
Pvc SOR
390
/`
1r 35
390
STEWART
CREEK
2
STA 0.97±
EX 30"SD
STA 0+511
EX .'s0-SD
8 7
W
?
¢
E 390.1±
7
IE 390.9
385 W
< N /
N
�j
385
Wj
NW
/
I
I
I
I
10'SS@0.
IY SS�OD03
to
I
\
2
I
I
18• SS a OA08 MIN
MANHOLE
CHANNELING
, .•i
FILL WITH
CONC (TYP 2)
380 0
c o7
380
N
b
Hj
-
375 UJI
15
375
J
FILL WITH
SAND (TYP)
370
370
S66.0655
18• HOPE SOR 17
365
8
w
365
�81
360
zo11Za���
�m.?
360
STA 5+00 STA 4+50 STA 4+00
STA 3+50 STA 3+00 STA 2450 STA 2+00 STA 1+50
STA 1+00 STA 0+50
STA 0+00
PROFILE
QccIl nu®
\fir M `"as
FSCALE:
E: 8OART: 1'-5'
235C00•C 100
DACE ENdNEERS, BC
INDICATED
Tjw
—
PRELIMINARY -
CITY OF EAST RENTON
-� RENTON
60% DESIGN SUBMITTAL
LIFT STATION JUNE 2D71
ELIMINATION _
BURIED ECALLBEFORES IN AREA
PLEASE CALL BEFORE YOU DIG
y
'b � All.
420AAL O
E�
��eMC
DATUM
PIaDDI1gJBuIwInWPuooc W«1tDePt. PIPING PLAN AND
PROFILE — STA 0+00 - STA 5+00 C-055
1J1WA24.6555
NO. REVISION
8Y DATE APPR
GENERAL NOTES:
/
A
A. INSTALL BURIED PIPE N
.� ACCORDANCE WITH CRY
STANDARD PLAN 405. BACKF81
I
I
KING COUNTY WETLAND AND STREAM
BUFFER IIMIiS
/\ 1S
C`-
(C "7
nn
,,`,
1
\ .Lnit�"'.�(8' g•�{- 18' PIPELINE BETWEEN STA 3+50 AND
\\ r STA B`59 WITH NATIVE MATERIAL,
11.1T78M.33fi S <
I
\ /
\ (
g- to
E-13166aa520 Z REMOVE ROCKS AND OTHER
,
DEBRIS 4 INCHES AND LARGER.
1= T
'�•,
; ' O \ OPT TRAA COMPACT TO 92% MDD PER ASTM
I
BRIAR HILLS
/
/
_-"------_- D7557.BACKFI L ALL GRAVE HER
PIPELINE WITH GRAVEL BORROW
/ �v� /
NO. 4
/
fJ
�
�J ' PER SECTION 9 03.14(1). COMPACT
LE
S` I
14 ": 1 -2
i{
--_TO 95% MOD PER ASTM D1557.
/ O
9]IN WIW74.12
E e•CMP(IE}l70.92
E I2'CYP(E}370.52
E I YCIP(W}389.62
E SD-CIP(N)-369.02
•� -
�f
�nF�� DISC ,{ �
635D-11.1{I&C
N-1T7437M3
/
/ R-37d
A-61'2157'
/ L.3982
qNG CO,
_
6'-1H•O / (� 5+00 (n B. LIMIT HDPE BEND RADIUS TO A MIN
/ MAPLE CLUSIER / iil OF TWICE MFR'S RECOMMENDED
��. -- / / 50 —� m BEND RADIUS.
3(�'}1 `` N
E JO'C1P(5}yie92
/
i
B I
E-t316BOt.107
F1E14l7117
(OWN. G31 LIMITS OF CONSTRUCTION P
-
0+-
/ / �Q PAPo(5
1B-� /-
UKDERCROM
LIMIT OF L�NSTRUCTION (TYP) / _
/ Y e• '(T1
12 5 KEY NOTES:
aIVOED
•
,
2
—
2'PEA P
c�---__.°
- 14881 PL.. $E
Cow WALK
ROLLEDQAN
4 (TYP) °
=
i...
m
-6 E-37J.3 -
R•370 °
O7 _ CONTRACTOR TO VERIFY DEPTH.
/ Ef3 \/ — .— L•396S 1ST CP012
10' CONSTRUCTION / 64 f 6.1�11.151N/11'
/ R-177862 529 O CORE DRILL AND CONNECT NEW
_ _
70'CIP
EASEMENT(TYP)
/
SANITARY SEWER PIPING WITH
E-t31863W
—A
WOD
—
ai CB RM-375.60
E 30-CMPM-370.35
/
/
72 _ _
I T WITH �T
/ ElEw380.72 CONKORNECTOR, OR EQUAL
EXIST
X MH 1t.Q90
I
_ _.
W S E
�" 3 �( 1"370.20
/ / 18' SS
INSTALL NEW 48' SANITARY
MANHOLE PER CITY STD PLAN
D I
C-07
\ CPpt
I 48'0
REPLACE SEWER LATERALS PER
CITY STD PLANS 406.1 AND 407.
CBPoY-A3.83
6,75D-11.1tMX/�1'
N-177587.910
MH 5314 086
STA
/ 20' PERMANENT EASEMENT (TYP)
E 8'LIP(S1!)-371.73
E-13168M 701
DEY-375.71
B+SBAi
p'
I
\
% \1 Wn0
/ 63;4 5D-10
.766
R 7717 766
IE1EV-32 � / � � � : '.'.. ':..': ;.' �..''.':':.'.
78.
/ °
�'®
'�.::.'.':'.'.. /
I g
i
I
i
_ BUM GAS
PIPELINE
PLAN
SCALE: 1- - 2d
FILE: 8235C00-G100
172.31 LF
I 108.41
i
250.00 LF
385
385
N
n
N
APPROXIMATE
EXISTING GRADE
u,ww ww
v�ww
nww
nw=
yl
380
380
APPROXIMAI
E EXISTING GRADE
a
4
rI
§
375
W 375
1
co
W
0
O
I
18' SS 0.013 MIN
W
IA
370
7 1
0 370
'
I
1
I
�
18'SS®0.002
N
365
I
I
15- SS 0.0143
W 365
LZ
LU
F-
360
W
W
Q 360
15-
PVC SDR 35
N
N
18' HDPE SDR 17
15•SS@0.00.1
I
1
W
W
_
_
Z
Z
355
w
_
355
+'
�n�■
� ii ZOO
7�i�
147838
er
Q
350 1
mma???d
ew¢£
350
STA 10+50
STA 10+00
STA 9+50
STA 9+00
STA 8+50 STA 8+00 PROFILE
STA 7+50 STA 7+00 STA 6+50 STA 6+00 STA 5+50 STA 5+00
M � r.•qs
r'
SCALE: -1'-2lY VERT:,••5'
FILE:: ez=3sc00ooc-too
PRELIMINARY - 60% DESIGN SUBMITTAL
a %�
\r
n � $
PACE ENGINEERS. NC
AS INDICATED ��
"—�TJW -�
Y�,JUNE iDi1
CITY OF EAST RENTON LIFT STATION
RENTON ELIMINATION
BURIED UTILITIES IN AREA
PLEASE CAL BEFORE YOU DIG
P'+:am 7STP'
�S7oN.1.
EDL �� DATUM
°""6Mc PIenMnWBUIICU1pIPu0Be Wort Dept PIPING PLAN AND PROFILE — STA 5+00 - STA 10+31
IADDA24S556
NO. REVISION By DATE APPR v..�.mnu
GENERAL NOTES:
A.
EXIST
MH 5315 135
RIM EL.398.041 1 2 }
CL CHNL 12- (N, E) 386.39L I
LIMITS OF CONSTRUCTION (TYP)
20'PERMANENT
O
EASEMENT (TYP)
10' CONSTRUCTION
O P
:•:,:::::::;: o\
� C
Nth
111
3c�0—
PLAN
C-01 SCALE: 1' • 20'
FLLE: 8235000-C-1W
< �: � c a rru lln (0)
I
I
n � I
1
F
R14NTION NTENTION
S POND
I
jEXISJ 0MH 5314 74 79
STA 0,75.77
a —r3 � ,•i i - I
o �96 •' ; 'I II
.► I
4 �� VALVE VAULT
lrss L I
\\
ELECT BLDG
WET WELL
EAST RENTON /
II LIFT STATION
EXIST 60.0 FACILITY
MH 5374 O80
STA 0,00.00 4 MERGENCY STORAGE WELL
/ `KING COUNTY VIE LAND AND
STREAM BUFFER IMITS
EXIST 60.0
MH 5314 079
W
MANHOLE CHANNELING
C-OS SCALE: 3/4• s 1'4Y
FILE: 823SC10•C-08
KEY NOTES:
Ot TEMPORARY BYPASS PUMPING MANHOLE. MAX NOISE OF
TEMPORARY BYPASS SYSTEM SHALL BE 45CEa.
COORDINATE ACCESS WITH CITY PERSONNEL. FIELD
VERIFY DIAMETER OF MANHOLE.
OLOCATION AND DATA FOR EXISTING MANHOLE IS
BASED ON CITY OF RENTON GIS DATA AND IS
/. APPROXIMATE. CONTRACTOR TO FIELD VERIFY.
(3 J CHANNEL WITH CONCRETE. CHANNEL HEIGHT - 12 INCHES.
1 BYPASS PUMPING DISCHARGE LOCATION. ROUTE PIPING
TO 04VERT OF EMERGENCY STORAGE WELL.
TEMPORARILY SUPPORT PIPING AS REOD.
OCONSTRUCTION OF TEMPORARY STREAM CROSSING IS
OPTIONAL AND IS PROVIDED TO FACILITATE EQUIPMENT
ACCESS ALONG PIPELINE ALIGNMENT. CONTRACTOR TO
INSTALL PER GENERAL DETAILS SHOWN ON THE DWGS
AND PER BEST MANAGEMENT PRACTICES. SUBMIT
TEMPORARY STREAM CROSSING TO ENGINEER FOR
APPROVAL PRIOR TO INSTALLATION. REMOVE ALL
MATERIALS FOR TEMPORARY STREAM CROSSING PRIOR
TO STREAMBANK RESTORATION.
(6 J COMPACT CSBC AND CSTC TO 95% MOD PER ASTM D 1557.
7 COMPACT HMA TO AT LEAST 91% OF ITS MAXIMUM
THEORETICAL SPECIFIC GRAVITY (RICE DENSITY),
7 GREATER OF EXIST OR 34NCHES MIN CLASS 3/4• HMA PER
WSDOT SECTION 903.8
I
6 34NCHES CSTC PER WSDOT SECTION MU (3)
tilt
6 6-INCHES CSBC PER WSDOT SECTION 9039 (3)
AC PAVEMENT
C-06 SCALE: 3/4' • 1'•0•
FILE: C-07Awp
EXIST GRADE
QUARRY SPALL
COARSE
AGGREGATE
12• DIA OF PIPE OR AS
NEEDED TO SUPPORT
LOADS, WHICHEVER IS
GREATER
I
GEOTEXTILE FABRIC
I'
TEMPORARY 8'0 METAL
I
PIPE CULVERT (TYP 2)
EXIST /
/ VV RIM EL - 40120 I 1 \ \
CL CHNL IO'(E, W)-387.2D _. TEMPORARY STREAM CROSSING 5 SECTION 6
C-05 SCALE: 3/4' s 1'-0' SCALE: i 12' • i,-cr
FILE: 8235CID•C48 FIE: 8235C10-C-08
PRELIMINARY - 60% DESIGN SUBMITTAL
BURIED UTLRES IN AREA
PLEASE GALL BEFORE YOU DIG
IAD3AAAM
GENERAL NOTES:
i
i
i
E�
i
i
i
i
SCALE: NTS
FILE: 823SC10L-08
INSTALL TEMPORARY GRAVEL BEFORE
GRADING PHASE OF PROJECT,
REMOVE PRIOR TO PAVEMENT
INSTALLATION
SCALE: NTS
FILE: 8235C10•C-08
c
vi
�\ 1• i • b`
.r
FILTER FABRIC MATERIAL 60- WIDE
ROLLS. USE STAPLES OR WIRE
RINGS TO ATTACH FABRIC TO WIRE
BURY BOTTOM OF FB NATEAIAL
N C BY t7 TRE1K.H [;�_
6• MAX. 11
rBY2'BY14GA. WIRY
FABRIC OR EQUN.
FILTER FABI
MATERIAL
4 2'BY2'BY 14 GA.
FABRIC OR EQUN.
u ucrtn rnw /
z
4�6 reED GRAVEv 4- wooD L POST
r BY 4• WOOD POSTS, STANDARD OR PROVIDE.4'-1S ASH
BETTER OR EQUAL ALTERNATE O BACKFLL IN TRENCH AND ON BOTH SIDES
PkBN SECS OF FILTER FENCE FABRIC ON THE
SURFACE
ITRANCE DETAIL (TYP) SILT FENCE DETAIL AND NOTES
C-02 SCALE: NTS
FILE: 823SC10-C48
INSTALL TEMPORARY FILTER FABRIC
BETWEEN FRAME AND GRATE OF ALL
CATCH BASINS AND INLETS INSIDE
OR ADJACENT TO DISTURBED AREAS.
P7M
IMPACTED AREA 10
• 1� ••.' ••.' ••.'
FISTING
1MPgC� !1
�FA KIT14
:.:, •:.:••. BLgN� COIR
I;iu--4
FILE: 8235C10•C-OB
<LcarrIln OD
e•
SACKS SHALL BE M10 JUTE BURLAP
OR APPROVED ALTERNATE FILLED
WITH 48 TO 55 LBS. OF PEA GRAVEL
BACKFILL FOR DRAINS.
PLAN
SCALE: NTS
FILE: 823SC10-C W
INSTALL APPROXIMATELY 3 FEET
ABOVE CHANNEL INVERT. ALIGN
LOW POINT IN DAM WITH CENTER
OF CHANNEL
ADD VISQUEEN
THROUGH FILLED
BURLAP SACK STACK
PLACE SACKS FIRMLY
AGAINST GROUND LINE
AND ADJACENT SACKS.
SECTION A
A. FILTER FABRIC FENCES SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFUL PURPOSE, BUT NOT BEFORE
THE UPSLOPE AREA HAS BEEN PERMANENTLY STABILIZED.
B. FILTER FABRIC FENCES SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING
PROLONGED RAINFALL. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY.
KEY NOTES:
O1 THE FILTER FABRIC SHALL BE PURCHASED IN A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID USE OF
JOINTS. WHEN JOINTS ARE NECESSARY, FILTER CLOTH SHALL BE SPLICED TOGETHER ONLY AT A SUPPORT POST, WITH A
MINIMUM 64NCH OVERLAP, AND BOTH ENDS SECURELY FASTENED TO THE POST.
OTHE FILTER FABRIC FENCE SHALL BE INSTALLED TO FOLLOW THE CONTOURS (WHERE FEASIBLE} THE FENCE POSTS SHALL
BE SPACED A MAXIMUM OF 6 FEET APART AND DRIVEN SECURELY INTO THE GROUND (MINIMUM OF 30 INCHES).
OA TRENCH SMALL BE EXCAVATED, ROUGHLY 81NCHES WIDE AND 12 INCHES DEEP, UPSLOPE AND ADJACENT TO THE WOOD
POST TO ALLOW THE FILTER FABRIC TO BE BURIED.
OWHEN STANDARD STRENGTH FILTER FABRIC IS USED, A WIRE MESH SUPPORT FENCE SHALL BE FASTENED SECURELY TO
THE UPSLOPE SIDE OF THE POSTS USING HEAVY-DUTY WIRE STAPLES AT LEAST 1 INCH LONG, TIE WIRES OR HOG RINGS.
THE WERE SHALL EXTEND INTO THE TRENCH A MINIMUM OF 4 INCHES AND SHALL NOT EXTEND MORE THAN 36 INCHES
ABOVE THE ORIGINAL GROUND SURFACE.
OTHE STANDARD STRENGTH FILTER FABRIC SHALL BE STAPLED OR WIRED THE FENCE, AND 20 INCHES OF THE FABRIC SHALL
BE EXTENDED INTO THE TRENCH. THE FABRIC SHALL NOT EXTEND MORE THAN 36 INCHES ABOVE THE ORIGINAL GROUND
SURFACE. FILTER FABRIC SHALL NOT BE STAPLED TO EXISTING TREES.
OWHEN EXTRA -STRENGTH FILTER FABRIC AND CLOSER POST SPACING ARE USED, THE WIRE MESH SUPPORT FENCE MAY BE
ELIMINATED. IN SUCH A CASE, THE FILTER FABRIC IS STAPLED OR WIRED DIRECTLY TO THE POSTS.
THE TRENCH SHALL BE BACKFILLED WITH 3141NCH MINIMUM DIAMETER WASHED GRAVEL.
OINSTALL UPSTREAM SCREENED DIVERSION PUMP. PUMP SHALL, AT A MINIMUM, BE A 6 INCH GAS POWERED TRASH PUMP,
SUFFICIENT TO HANDLE EXPECTED STREAM FLOWS OF OS TO 3 CUBIC FEET PER SECOND INCLUDING FLEXIBLE PIPE
SYSTEM.
OSELECT DISCHARGE POINT DOWNSTREAM OF IMPACTED AREA TO AVOID EROSION.
10 INSTALL UPSTREAM COFFERDAM WITH LOW POINT ALIGNED WITH CENTER OF ACTIVE CHANNEL
11 INSTALL DOWNSTREAM COFFERDAM BELOW IMPACTED AREA.
12 COMPLETE ALL IN WATER WORK, GRADE SITE AND INSTALL COIR LOGS OR COIR BLANKET WHILE CHANNEL IS DE -WATERED.
PRELIMINARY - 60% DESIGN SUBMITTAL
BURIED LR6RES IN AREA
PLEASE CALL BEFORE YOU DIG
I.W3.4245555
Planting Zone 1: Forested Buffer Enhancement
Scientific Name Common Name Type Spacing Plant Number Special instructions
Trees
Acer macrophyllum
Bpleaf mople
lost
Bit O.C.
32
Alms rubra
Red elder
11 gal
1 61t o.c.
16
Pseudolsuga rnenziasii
Douglas fir
1 gal
1 611 O.C.
55
Total Trees
103
Shrubs
Mahonia nervosa
Low Oregon grape
1 gal
4 it o.c.
16
Oanderfa cerasif mis
Indian plum
1 gal
4 It o.c.
16
Physocarpus ca0latus
Pacific runebark
1 gal
4 it oz.
16
Pblystic/wm munilum
Sword fern
i gal
4 it o.c.
36
Rubus spectebilis
Sal onberry
1 gal
4 it o.c.
18
Symphoricarpos albus
Snowberry
teal
Oft O.C.
18
Total Shrubs
125
Total Area (square feet) j ; i
5,708
TREES
(v O.C. TYP.)
SHRUBS (4- O.C.
COMMON NAME
TI - Douglas k
T2 • Big leaf maple
T3 -Rea alder 3
Si:Red
S2 - In®an plum L-02
S3 -Sword fern
S4-Snowberry
S5 - Low Oregon grape
S6 -PaciBt nineberk
TYPICAL PLANTING COMPOSITION IN A 900
SQUARE FOOT AREA TO CONSIST OF
APPROX. 16 TREES AND 20 SHRUBS.
A PLAN
SCALE: V-30'
FILE: 8235C00-L-01
Planting Zone 2: Shrub & H roseed Buffer Enhancement
Scientific Name Common Name Type Spacing Plant Number Special Instructions
Shrubs
Mahomms rmrvose
Low Oregon grape
1 got
4 It o.c.
54
Oemleria cerasilomos
kWOn plum
1 gst
4 it O.C.
54
Physocsrpus caprtafus
Pacific n neberk
1 gat
4 it o.c.
54
Payshchum munitum
S. ord fem
1get
Oft o.C.
71
Rubus spectabilis
Sakronberry
1 gal
4 It o.c-
71
Symp/ carpus slbus -
Snow berry
1931
4 it o.c.
54
Total Shrubs
357
Total Area (square leer)
12,557
40'
� I
eI. SHRUBS (4- O.C. TYP.)
HYDROSEED BETWEEN
SHRUB CLUSTERS
�� 4:•� I
4
GROUP LIKE SPECIES
TOGETHER
ELM
TYPICAL 900 SQUARE SQUARE PICAL 1600 FOOT AREA TYPICAL PLANTING COMPOSITION IN A 16W SQUARE
FOOT AREA FOOT AREA TO CONSIST OF 3 TREES AND 18 SHRUBS.
PLOW PLANT TREES AND SHRUBS IN NATURAL GROUPINGS TO
G
�CREATE WILDLIFE HABITAT ZONES.
\ TYPICAL FOREST BUFFER ENHANCEMENT PLANTING DETAIL TYPICAL SHRUB AND HYDROSEED BUFFER ENHANCEMENT PLANTING DETAIL
SCALE: nts(DFLE: SCALE: nts
FILE: 8235C1O-L-01 6235C1O-L-01
r ESA
5309 Shhhole Ave. NW
Seattle, WA 98107
P:( W) 789.9658
F: (206789A084 BURRED UTILITIES INAREA
PLEASE CALL BEFORE YOU DIG
1.B ,424.5555
KEY
WOODCHIP PATH (2736 SF) O
FORESTED BUFFER ENHANCEMENT (6708 SF) 1
SHRUB a HYDROSEED BUFFER ENHANCEMENT (12,557 SF)
L-01
STREAM BANK RESTORATION (202 SF) 3
L-01
O t� +++ EROSION CONTROL HYDROSEED (745 SF) O
GENERAL NOTES:
A MAINTAIN EXISTING PATH NETWORK. COVER WITH 4'
WOODCHIP MULCH AT TIME OF PLANTING.
B. BACKFILL TOP 24' OF PIPELINE TRENCH WITH NATIVE SOIL,
SHEET L-02 DETAIL 2.
C. PLANTING SHALL EXTEND TO UMITS OF CONSTRUCTION,
AS SHOWN ON THE CIVIL DWGS.
KEY NOTES:
Oi WOODCHIP MULCH SHALL BE EVENLY SPREAD 3' DEEP
THROUGHOUT DESIGNATED AREAS, SEE PLAN SHEET L-01.
ONATIVE HYDROSEED NIX WI MULCH INCLUDED SHALL BE
APPLIED AT A RATE OF 40 LBS PER ACRE THROUGHOUT
DESIGNATED AREAS, SEE PLAN SHEET L-01.
OAPPLY BENTONRE LINER TO PROPOSED PIPELINE TRENCH, ON
TOP OF PIPELINE BEDDING AND UNDER FISH MIX GRAVEL SEE
SHEET L-02, DETAIL 1.
Planting Zone 3 Stream Bank Restoration
Scientific Mama 1common Name
IType
ISpacing
1PLant Number Spacial Instructions
Shrubs
Comus sericee
Red -osier dogwood
Livestake
2 ft o.c.
1 20
Selix lucide
pecitic wibw
Livestake
21t o.c.
13
Salix sitchensis
Sdke waow
luarstalue
121t O.C.
I 18
Total Shrubs
51
Total Area (square feet)
I
202 j
n
L-02
eSHRUBS
(TYP.)
COMMONNAME
Si -Red sternmed dogwood
S2 -SUM willow
S3 - Pacific willow
TYPICAL PLANTING
COMPOSITION IN A 625 SQUARE
FOOT AREA TO CONSIST OF
APPROX 27 SHRUBS.
DECREASING
1E ELEVATION (TYP.)
EL&
3 TYPICAL STREAM BANK RESTORATION PLANTING DETAIL
SCALE: nts
FILE: 823SCID.L-01
PRELIMINARY - 60% DESIGN SUBMITTAL
GENERAL NOTES:
A. ...
I �
I �
EXISTING STREAM BANK
I
� I
F�pN,
EXISTING
A A, STREAM
� I
I I
� I
EXISTING STREAM BANK \
MAR
FISH MIX GRAVEL MATCH EX GRADE
2' THICK BENTONITE LINER MT)
NEW PIPELINE
NATIVE SOIL
SCALE: NTS
FILE: 8235000-L-01
EXTEND LINER 4' UP SIDE OF TRENCH
PROPOSED PIPE BEDDING
(SEE CIVIL DWGS)
PLANT LIVE STAKES THROUGH COIR
BLANKET ON STEEP SLOPE RIPARIAN
AREA
PLANT TREES AND O
SHRUBS IN UPLAND AREA
INSTALL COIL
BLANKET ON
SLOPE PER CITY
STANDARD PLAN
FLATTOP 24AAN BOULDER PLACED IN
213.10
MIDDLE OF STREAM IN CENTERLINE OF
EXISTING TRAIL
d
a
STREAM BANK PLANTING SECTION
U7�4
SCALE: Irr-V-0'
FILE: 8235C00-L-01
r ESA
53D9 ShIlshole Ave. NW
Seattle, WA 98107
s P: (206) 789.9658
F: (206789-9684
1
BURED UTIUES IN AREA
PLEASE CALL BEFORE YOU DIG
1BOO.424-56%
24'NATIVE SOIL
MATCH EXISTING GRADE
NEW PIPELINE
NATIVE SOIL
PROPOSED PIPE BEDDING
(SEE CIVIL DWGS)
SECTION
2 S NATIVEBACK ILL DETAIL P
FILE: 8235COO-L-01
PLANT LIVE, DORMANT STAKES BETWEEN
OS AND 1 INCH IN DI"
IV O.C. SPACING (TYPK':jW O.C. SPACING OYM24
SECTION
LIE 5 S V NTS STAKE
FILE: 82350001-01
SQUARE CUT
MINIMUM OF 2 BUDS
EXPOSED
MAKE PILOT HOLES IN
EXISTING SOIL WITH REBAR.
TAMP SOIL AROUND LIVE
STAKES.
ANGLE CUT AT 45
DEGREES
SCARIFY ROOTBALI
ROOTSANDI
K
ZpFp
��rc
KEY NOTES:
OA TEMPORARY STREAM DE -WATERING SYSTEM SHALL BE IN
PLACE TO DIVERT FLOW AROUND WORK AREA PRIOR TO
INITIATION OF TEMPORARY STREAM CROSSING REMOVAL.(SEE
SHEET C-02).
OREMOVE ALL MATERIALS USED IN TEMPORARY STREAM
CROSSING.
OSTABILIZE SLOPE PER CITY OF RENTON STANDARD PLAN 213.10.
OINSTALL LIVE STAKES ON STEEP SLOPES, ADJACENT TO
STREAM.
OPLANT TREES AND SHRUBS IN UPLAND AREAS.
K Ur UUMY b I tU MULE , rt I KtK
TO EDGE OF ROOTBALL, EXTEND 6'
) WATERING BASIN CIRCLE
FINISH
GRADE
BACKF0.1 WITH NATIVE SOIL ONLY
SCARIFY EDGES OF PLANTING HOLE TO ALLOW FOR
ROOT PENETRATION
BOTTOM OF ROOTBALL RESTING ON
3X ROOTBALL DIAMETER UNDISTURBED SOIL
SEGO
GTREE SHRUB PLANTING DETAIL
SCALE: NTS
FILE: 8235COD•L-01
PRELIMINARY - 60% DESIGN SUBMITTAL
/tL v I icy✓ 14---- os o eL -,s-3t4.. - o sue,
d� u
R
4
I�ot
�I
/2� u-J
000
��
�---ate
a__
NW 1/4, NW 1/4, SEC. 14, TWP. 23 N., RGE. 5 E., W.M.
g Z.ri " , ^ < \ \ l :1/ F13�—\ / / 2 i
' . j - . ^\\ \\ 1 15 1,+az Lr. zz o , .�g'` /h1F—� \ !/ \ < / I
Y vi �:J
10SITRFACF aE4WUr
U mr OETAH, 9kar
ail.
0
RIM Of2Ai
METLCNO MIRaARLiv AREA
.SEE TERRA AS509A IES R'ANS / •�, /' Q' /
�
87E 46., S'o6.z8 _rl STA. ?,,A RT.- /10 \\�/ \
I 44&F 8' O
2'If, 8' 0FO?a isMAN \ OUT_ I I/ !! !!� �
SEE AIN�99FT 1 1 1` 15'-SAN.. SHR E5117 1 !^� i \•\\\'\ i. ..,' /'STA !l+a,{ LT. fl0 � \' / ,,/ / �
C5Jl I. RI aTY OF RENTpY \'\ _ \ < 217
1 - - --- -41 �M 1�\ PO'unurr'
T a - -- - -- -- ` 94+`.6-n (;N7'TO.`CITY _
{ / OF RENrON +STA IOfJ1, LT. 6J \\ // /! L I a
4 ��V
w 112
q N , y
TRACT I \
113 PARK
W z </ TRACT G
^pc.N SPACE 1 7 Y'TA 0+0$ RT. 9.0 `__-sh
0Ho■g
Ilm
mol
17
MAN
ON,
MIN.
`
li
LE4o9Q ' I xe /., KEY MAP
118
J4LF ll //'
- 119
418
I.
002470
JE
.I j Z c : \ \ 1-20 \ -.\♦ ! �%.�. '/ l3FB. \� \ 9�;A� a. 414
Tat+nRr.z \.
N E a 20' UllUIY ANO ACCESS / 8m, 6' 4.YF 5N \ \ \ ) a$
22� 5TO[,18/1�RANV \\\ .\�. \''0 ¢A�iO— --4 £4GG7..� % j^�<\ ��o.. \\ \\ '' `�\�. �\ 'I-------<lz- -- `-
I1��''11 v € AV AC= EW r 70 . \ ; 2 2 \ 1£� / / \ \ \ `„' ; ^ \\ \ e--- / •`
.3. aTY IF RE, W \\ 1221F. v /i- . \ \ 164
\ \ 00047� n z:.p-017J5
�I' P
x46' E407QNSTMC49g5 255 5
.-
EW770aTY OF�` \ \ i �, ' / 90LJ10 I \�' 166
a � R&76V If-40J0) __ _ -
i,23 m j i oQ,4B5 -- -- - SCALE: 1" — 40'
1E 406.0
\STA 2+5J R. �' \ \\ 0"01750 1 \\ �' 167 ; ! .O a1215-,, IJ�F6` --2&-F 6' '261F6� - - ---I-
�� - �aJ.\ \�� \ \ i \ ` 4045 / ., o ants 1 I o;
< /� \\.`. r \ \ ./ V lE 4055 L' itE 4010 0 0.,070 - -
OQlOJS'
i ��(168 169 i E4aso uE4oso
x, p o.1J9s % 1 70 171 17 BENCH MARK
/
40.S0 162 , �� rl It I 1 fi BENCH MARKS PER CITY OF RENTON
- SURVEY ON NAVD 1988 DATUM
PTp1852 = 3' BRASS SURFACE
1 2J
1.61. DISC. IN THE INT. NE 4TH ST. (S.E.
i 128TH ST.) & 148TH AVE S.E.
• �'� ,.59 �j/./ //�/ \ ''/ J \\CZ,\ \ °r.�1__ — — _ EL 454.77 OR (138.614 METERS)
�� i,14 S9 01 v OQG95$ �`O Q15$5/ / 1 I I III I- PTp2103 - BROKEN BRASS SURFACE
406D60 I I 1 , DISC: IN THE INT. S.E. 128TH ST. &
0R14Qf i 1 59 i .:I 156TH AVE S.E.
4azo R 1 ; f 1 Q8 157 1 i ( )
!J ! EL, 547.94 OR 167.013 METERS
-W O'(0 6 0. 009
46
4xf 8,
000I
�0925 10.95 7851 1 o01at7 I
000051
-"o' ' 'aIII'III�,`I`I• J``I ' �'�t , "1� I �I�I\C�!\ImoI\ oI\II, \ `,.�(, 3�_/ " `r�(\ ,_ _(��/ \ (�J `\�\( \�s��\ \\\\ \\S\EE.. Uf7 SIA nON PLAN, r 5
--_
--C---J4�.6Qs.zx1r0�E' E4_J�o_ �e--o-- Q
SHEET C5J2.TRACT H
STORM DRAINAGE —
-N-BBltl'I1_.-9 �-o -
{TO HOMEOWNERS 0 0109" _S.L_CYD�'
2B45' BEND ASSOC1281E 0.IATION rARv
z�' �Ev> ro
.
B" CLEANOUT 9ONm
zz�
- +�f/�/ Y••�;✓;T,•;t
h=G!
cis ¢&MN. -
CONC. BLOCKING \ Q� 1 JBB .�1 - - \ C , / . J71F6' ,
F• 0 0 0 0 \
J94 392 // 1E 7a201 I OQOB15 71LF6 1 -
i _ I^ 291f 6' 29LF 6 19LF 6 r
J94 _ // 1 I1E 4L120 I 1f 40 OQ214.S5 I 1 0005151. 1p QOdJO f I ORS
130 i if 40L0 .'. j f 401.0 i IIE 4010 . I /f'Am.0 ! I . r
3 I I 1 132 133 .134:1 1 5 �•
WS a __-�-_ __j Lo - _ :.... o Z7,O' \5'IA 4467 RT -7.2,. - 31I 1 I
o Q o py.. �• — —_ --1-- — — ——
i
fURAIF SSI/N
Fo N - - fURW 12' QRA NTY
W z r z
- R LLp 60I, CLCAIE AS 9/O8N' _ N 8$•001 -W- -- EVSWO 12' WA IER.vA#V 4 .- /�
1277.42
a 3 60.9 LOCAIf AS 9iOW - - - IOC4,f AS SWIW - -- - _
0 U U p N 1105 14811 Ava. NE, 1,11200
d O m li - Bellevue, Walhln9ton 98007
425.ee5.7877 Fe,r 425.e85.79e3
5n 5 s
ENGINEERING PLANNING 5 U R VEYIN,G
i ASBUILT
N n w v o yyWP-3)� SCANNED FEB 15 2002
j z
/4:; �; .\ _ n SE 7 / 1 _ .�; , 7 94168CS05
ROuL.
IL .111- 4 F R 0.51
.4t
PROJECT SUMMARY Estimate Class:
Project: East Renton Lift Station Elimination
PRELIMINARY - 60% DESIGN SUBMITTAL PIC:
Job #: 8235C10 PM:
Location: Renton, WA Date:
Zip Code: 98055 By:
Reviewed:
3
Brian Matson
Lara Kammereck
June 14, 2011
Tyler Whitehouse
Brian Casey
NO DESCRIPTION 111, �TOTAL_
E. y r r a 3z
01 12-inch SS STA 0+00 to 0+76
$32,513
02 18-inch SS STA 0+76 to 8+58
$191,833
03 . 15-inch SS STA 8+58 to 10+31
$43,622
04 48" Dia MH 5314 086
$6,344
05 Lift Station Demolition
$10,000
TOTAL DIRECT COST
$284,313
Contingency 20.0%
$56,863
Subtotal
$341,176
General Contractor Overhead, Profit & Risk 10.0%
$34,118
Subtotal
$375,293
Gross Receipts Tax (Based on King County, WA) 9.5%
$35,653
Subtotal
$410,946
General Conditions 15.0%
$61,642
TOTAL ESTIMATED CONSTRUCTION COST
$473,000
The cost estimate herein is based on our perception of current conditions at the project location. This estimate reflects our professional opinion of
accurate costs at this time and is subject to change as the project design matures. Carollo Engineers have no control over variances in the cost of
labor, materials, equipment; nor services provided by others, contractor's means and methods of executing the work or of determining prices,
competitive bidding or market conditions, practices or bidding strategies. Carollo Engineers cannot and does not warrant or guarantee that proposals,
bids or actual construction costs will not vary from the costs presented as shown.
fin: East Renton Construction Cost Estimate As -PROJECT SUMMARY Page 1 of 1
Printed: 6/13/2011-10:49 AM
14
Gi CAr%^sd's
Build C'os Matnx : .',I
.r4
.°"
M j,
RECAP MATRIX
Project:East Renton Lift Station Elimination
PRELIMINARY - 60% DESIGN
SUBMITTAL
Date : June 14, 2011
Job #:8235C70
Location: Renton, WA
Estimate Class:
3
By: Tyler Whitehouse
SPEC. DIVISION/
DIV. 01
DIV. 02
DIV. 03
DIV. 04
DIV. 05
DIV. 06
DIV. 07
DIV. 08
DIV. 09
DIV. 10
DIV. 11
DIV. 12
DIV. 13
DIV. 14
DIV. 15
DIV. 16
Div 17
ELEMENT
ELEMENT
ELEMENT
GEN
SITE
CONC
MSNRY
METALS
WOOD &
MOIST
DOORS &
FINISHES
SPECIAL-
EQUIP
1
FURN
SPECIAL
CONVEY
PLUMBG
ELECT/
INST.
%of
DESCRIPTION
REQTS
WORK
Plastics
PROTN
WOOS
TIES
CONST
& MECH
I & C
I & CONT.
TOTALS
Total
01 12-inch SS STA 0+00 to 0+76
$27,687
$3,401
$1,426
$32,513
11.44%
02 18-inch SS STA 0+76 to 8+58
$28,780
$125,462
$37,591
$191,833
67.47%
------------
----------------------------------------------
03 15-inch SS STA 8+58 to 10+31
— —
--------'---'-•--.......---•---.—........._--•-------------....----...•-----•-------.-----------------------..._......._....._......._...----•------------•------•--•---------------------------------------•----------------._.._._._......_
—
—$35 534
_ ----------------------__---------------•------------••---------------....._.._....._............._.........._..._.._...----...__...----------------------------•--•----------•---------------...._._._._._----
$8.089
._•._...--------
$43,622
--------------
15,34
------------
04 W-1 Dia MH 5314 066
$4 581_
$1 763
$6,344
--------- — —
2.23
-- —
05 Lift Station Demolition
—
$10,000
_ —.. _ ---------------.—••—•••---•—•••—......•---.....
. ......
$10,000
3.52%
Total Direct Cost
---........._------------------------------------
28L780—__203--
3,401
0
0 13763
PercentofTotal
- ___
10,12%
- -
71.49%
-------3,401 -------- ___0
1.20% 0.00%
_____0_—___—__0__
0.00% 0.00% 0,00%
- -..________0_____________0______________0___________0__—_________04711060__________05284r313___—_________
0.00% 0.62% 0.00%
0.00% 0.00% 0.00%
0.00% 16.57% 0.00%
0.00%
100.00%
COMMENTS I NOTES
1 Note that the above costs DO NOT include
., Ear—coy»„amc 'Ewmne "OSr Wlta Page 1 of 1 Enm.e: a�vzoir�to.�au.�
10
a�ra1:r
Project: East Renton Lift Station Elimination
PRELIMINARY - 60% DESIGN SUBMITTAL
Job #: 8235C10
Location: Renton, WA
Element: 01 12-inch SS STA 0+00 to 0+76
DETAILED COST ESTIMATE
Date : June 14, 2011
By: Tyler Whitehouse
Reviewed: Brian Casey
SPEC�NO
DESCRIPTION
EW'k
VQt)ANTITYF
g
r
UNITx
...s
UNIT COST
.. -
SUBTOTAL
P
_ ..
a°.'#
TOTAL
-
Division 02 - Site Construction
02000
Plug Existing Pipeline and Abandon
2.00
LS
$394.82
$789.64
02000
Misc Connection Allowance
2.00
LS
$581.84
$1,163.68
02000
Misc Site Restoration 0+00 to 0+76
1.00
LS
$5,000.00
$5,000.00
02000
Trench Box per Day
10.00
Day
$60.78
$607.82
02000
Bypass Pumping SSW 73
1.00
LS
$5,000.00
$5,000.00
02000
Bypass Pumping SSMH 72A
1.00
LS
$5,000.00
$5,000.00
02000
Sand Fill
7.27
CY
$20.78
$151.07
02220
Core Drilling, 16" Diameter
1.00
LF
$305.47
$305
02240
10Hp Submersible Pump, 3" Elect.
10.00
DAY
$144.42
$1,444
02300
10 Cy Dump Truck, 10 Miles/Round Trip
108.37
CY
$9.99
$1,083
02300
Imported Pipe Bed & Zone/Confined Structure Backfill,
Class B Material
24.63
CY
$84.85
$2,090
02300
Native Trench Backfill/Unconfined Struct. Bf, Class B
Material
0.00
CY
$18.29
$
02300
Cat 225 Trackhoe, 1Cy Bucket, Class C (Hard Digging), 0-
16' D
108.37
CY
$6.18
$670
02300
Imported Trench Backfill/Unconfined Struct. Bf, Class B
Material
83.74
CY
$41.86
$3,505
02580
Concrete Manhole Invert, Single Channel
1.00
EA
$327.62
$328
02580
Concrete Manhole Invert, Triple Channel
1.00
EA
$549.16
$549
Total
$27,686
Division 03 - Concrete
03000
Concrete Manhole Fill
21.82
CY
$155.85
$3,400.65
Total
$3,401
Division 15 - Mechanical
15265
12" Sdr-35 Pvc Sewer Pipe, In Trench
76.00
LF
$18.77
$1,426
Total
$1,426
Grand Total
$32,513
fin: East Renton Consly bn Cost Estimate., s 01 12sx0 SS STA 0«00 to 0,76 Page 1 of 1 Eon„ Re, 200e.t�
Project: East Renton Lift Station Elimination
PRELIMINARY - 60% DESIGN SUBMITTAL
Job #: 8235C10
Location: Renton, WA
Element: 02 18-inch SS STA 0+76 to 8+58
DETAILED COST ESTIMATE
Date : June 14, 2011
By: Tyler Whitehouse
Reviewed: Brian Casey
=-SPEC-
a DESCRIPTION
QUANTITY
UNIT
UNIT COST
SUBTQTAL
TOTAL
Division 01 -General Conditions
01000
Monitoring and Maintenance
1.00
LS
$28,780.30
$28,780.30
Total
$28,780
Division 02 - Site Construction
02000
Misc Site Restoration 0+76 to 8+58
1.00
LS
$5,000.00
$5,000.00
02000
Misc Connection Allowance
2.00
LS
$581.84
$1,164
02000
Stream Diversion/Crossing Allowance
1.00
LS
$10,000.00
$10,000.00
02000
Utility Relocation Allowance
1.00
LS
$5,000.00
$5,000.00
02000
Trench Box per Day
25.00
Day
$60.78
$1,520
02000
Stream Bed Restoration
1.00
LS
$2,940.37
$2,940.37
02000
Buffer Restoration and Tree Replacement
1.00
LS
$17,382.47
$17,382.47
02000
TESC Allowance, Entire Project
1.00
LS
$10,000.00
$10,000.00
02220
Core Drilling, 22" Diameter
1.33
LF
$763.67
$1,018
02240
10Hp Submersible Pump, 3" Elect.
25.00
DAY
$144.42
$3,611
02300
Cut & Remove Tree, 8" Diameter
17.00
EA
$415.60
$7,065
02300
Cut & Remove Tree, 24" Diameter
14.00
EA
$675.35
$9,455
02300
10 Cy Dump Truck, 10 Miles/Round Trip
326.25
CY
$9.99
$3,261
02300
Remove Grass & Shrubs, 4" Depth To 1 Acre
0.54
AC
$1,154.03
$623
02300
Imported Pipe Bed & Zone/Confined Structure Backfill,
Class B Material
326.25
CY
$84.85
$27,683
02300
Native Trench Backfill/Unconfined Struct. Bf, Class B
Material
318.13
CY
$18.29
$5,819
02300
Cat 225 Trackhoe, 1Cy Bucket, Class C (Hard Digging), 0-
16' D
815.63
CY
$6.18
$5,041
02300
Imported Trench Backfill/Unconfined Struct. Bf, Class B
Material
171.25
CY
$41.86
$7,168
02300
10 Cy Dump Truck, 10 Miles/Round Trip
171.25
CY
$9.99
$1,711
Total
$125,462
Division 15 - Mechanical
15267
18" Sdr 17 Hdpe Pipe In Open Trench
783.00
LF
$48.01
$37,591
Total
$37,591
Grand Total
$191,833
fin: East Renton Con�m Cost Estwa-e 02 18-Oxh SS STA 0�76 to 8-58 Page 1 of 1 Fonn Rev: 200aJ,-
Project: East Renton Lift Station Elimination
PRELIMINARY - 60% DESIGN SUBMITTAL
Job #: 8235C10
Location: Renton, WA
Element: 03 15-inch SS STA 8+58 to 10+31
DETAILED COST ESTIMATE
Date : June 14, 2011
By : Tyler Whitehouse
Reviewed: Brian Casey
-NO11WCERIP1I
�
ON
QUANTITYUNIT
]'NINE_
UNIT COSTUBTOTAL
INK
=SPECWM
Division 02 - Site Construction
02000
Misc Site Restoration 8+58 to 10+31
1.00
LS
$5,000.00
$5,000+00
02000
Misc Connection Allowance
2.00
LS
$581.84
$1,164
02000
Trench Box per Day
20.00
Day
$60.78
$1,216
02220
Demo Pvc Pipe From Trench, 4" - 18" Incl. Fittings
173.00
LF
$4.34
$751
02220
Asphalt Pavement Cutting
1,432.00
inFT
$.78
$1,116
02220
Core Drilling, 20" Diameter
1.00
LF
$643.66
$644
02220
Remove 4"-6" Asphalt Pavement
994.75
SF
$.67
$670
02240
10Hp Submersible Pump, 3" Elect.
20.00
DAY
$144.42
$2,888
02300
10 Cy Dump Truck, 10 Miles/Round Trip
228.26
CY
$9.99
$2,281
02300
Imported Pipe Bed & Zone/Confined Structure Backfill,
Class B Material
66.08
CY
$84.85
$5,607
02300
Imported Trench Backfill/Unconfined Struct. Bf, Class B
Material
162.19
CY
$41.86
$6,789
02300
Cat 225 Trackhoe, 1Cy Bucket, Class C (Hard Digging), 0-
16' D
228.26
CY
$6.18
$1,411
02742
4" Pavement Replacement On 6" Abc Over Trench
994.75
SF
$6.03
$5,997
Total
$35,534
Division 15 - Mechanical
15265
15" Sdr-35 Pvc Sewer Pipe, In Trench
173.00
LF
$46.76
$8,089
Total
$8,089
Grand Total
$43,622
fin: East Renton Cau *n Cosl Estmate.4"3 15ixh 55 STA 8-58 to 1D-31 Page 1 of 1 Eon„ Rev: 2008Jt„e
DETAILED COST ESTIMATE
Project: East Renton Lift Station Elimination PRELIMINARY - 60% DESIGN SUBMITTAL
Job #: 8235C10 Date : June 14, 2011
Location: Renton, WA By: Tyler Whitehouse
Element: 04 48" Dia MH 5314 086 Reviewed: Brian Casey
. NO `ON
��
Iml
UNIT
UNIT COSTS
SUBTOTAL;
�SPED��
�T.OTAL
Division 02 - Site Construction
48" X 8' Deep Precast Manhole, No Ring & Cover, No
02580 Earthwork 1.00
EA
$2,149.42
$2,149
02580 48" Precast Manhole, Xtra Depth Over 8' 1.00
VLF
$284.65
$285
02580 48" Manhole Precast Slab Top Or Bottom, 8" Thick 1.00
EA
$375.16
$375
02580 24" Dia. X 350 Lb Watertight Manhole Frame & Cover 1.00
EA
$639.70
$640
02580 2" Precast Grade Ring, 4-Piece, 20" - 26" Diameter 1.00
EA
$566.47
$566
02580 Concrete Manhole Invert, Single Channel 1.00
EA
$327.62
$328
02580 Polypropylene MH Steps 9.00
EA
$26.49
$238.45
Total
$4,581
Division 09 - Finishes
09000 MH Coating, High Solids Urethane 113.10
SF
$15.59
$1,762.66
Total
$1,763
Grand Total
$6,344
fln East Renton Con—u -Cost Estimate 410a 48' Die MH 5314 086 Page 1 of 1 F— Re, 2008J—
-Care
...mow �,.d...
DETAILED COST ESTIMATE
Project: East Renton Lift Station Elimination
PRELIMINARY - 60% DESIGN SUBMITTAL
Job #: 8235C10
Date: June 14, 2011
Location: Renton, WA
By : Tyler Whitehouse
Element: 05 Lift Station Demolition
Reviewed: Brian Casey
=SPECNO.
bESCRJPTION
QUANTITY
UNIT
4 UNIttOST�x
SUBTOTAL_
TOTAL"
,
r=
Division 02 - Site Construction
02000 Miscellaneous Site and Lift Station Demolition
1.00 LS $10,000.00 $10,000.00
Total $10,000
Grand Total $10,000
vn: Eav Remo co VW.n cot Esim,aro.,u 5 u St— e..w Page 1 of 1 Fw Rev 20WJ—
eava..:Nd1JnA LtMfars LY3M1 W fd
PROJECT SUMMARY
Project: East Renton Lift Station Elimination
PRELIMINARY - 60% DESIGN SUBMITTAL
Job #: 8235C10
Location: Renton, WA
Zip Code: 98055
Estimate Class: 3
PIC: Brian Matson
PM: Lara Kammereck
Date: June 14, 2011
By: Tyler Whitehouse
Reviewed: Brian Casey
Pi l
., a
44�i
t � DESCRIP NOTION "
3-11
�g
'; r -"yR.
g
y �, g 3TOTAl
01 12-inch SS STA 0+00 to 0+76
$32,513
02 18-inch SS STA 0+76 to 8+58
$191,833
03 15-inch SS STA 8+58 to 10+31
$43,622
04 48" Dia MH 5314 086
$6,344
05 Lift Station Demolition
$10,000
TOTAL DIRECT COST
$284,313
Contingency
20.0% $56,863
Subtotal
$341,176
General Contractor Overhead, Profit & Risk
10.0% $34,118
Subtotal
$375,293
Gross Receipts Tax (Based on King County, WA)
9.5% $35,653
Subtotal
$410,946
General Conditions
15.0% $61,642
TOTAL ESTIMATED CONSTRUCTION COST
$473,000
The cost estimate herein is based on our perception of current conditions at the project location. This estimate reflects our professional opinion of
accurate costs at this time and is subject to change as the project design matures. Carollo Engineers have no control over variances in the cost of
labor, materials, equipment, nor services provided by others, contractor's means and methods of executing the work or of determining prices,
competitive bidding or market conditions, practices or bidding strategies. Carollo Engineers cannot and does not warrantor guarantee that proposals,
bids or actual construction costs will not vary from the costs presented as shown.
fln: East Renton Construction Cost Estimate.xls-PROJECT SUMMARY Page 1 of 1
Printed 6/13/2011-10:49 AM
t BLuid Cast Matnxlhi
7
RECAP MATRIX
Project:East Renton Lift Station Elimination
PRELIMINARY - 60 % DESIGN
SUBMITTAL
Date : June 14, 2011
Job #:8235C10
Location: Renton, WA
Estimate Class:
3
By: Tyler Whitehouse
SPEC. DIVISION/
DIV. 01
DIV. 02
DIV. 03
DIV. 04
DIV. 05
1 DIV. 06
1 DIV. 07
DIV. 08
DIV. 09
DIV. 10
DIV. 11
DIV. 12
DIV. 13
DIV. 14
DIV. 15
DIV. 16
Div 17
ELEMENT
ELEMENT
ELEMENT
GEN
SITE
CONC
MSNRY
METALS
WOOD &
MOIST
DOORS 8
FINISHES
SPECIAL-
EQUIP
FURN
SPECIAL
CONVEY
PLUMBG
ELECT/
INST.
%of
DESCRIPTION
REQTS
WORK
Plastics
PRO TN
WDOS
TIES
CONST
& MECH
18 C
8 CONT.
TOTALS
Total
01 12-inch SS' STA 0+00 to 0+76
$27,687
$3,401
$1,426__________________________
02 18-inch SS STA 0+76 to 8+58
_..__....-------------------------------------
$28,780 ....—'-...--'------"---'•----•----'------'--------------------------------------------------•---------------------------------------------'•-----------...----•--•--------..t—_..._._._—._..._._._._----
$125,462
$37 591
_____$32,513
$191,833
-------------
_-11.44
67.47
---------•--
03 15-inch SS STA 8+58 to 10+31
---'-----------------------------.....
-----------'
$35 534
-------------------------------------•------...._._......_.__..___..—_.._....._...._..._—.
_ $8,089________—___ -----------_._--
-----_$43t622
----------
04 48_'_Dia MH 5314 086
05 Lift Station Demolition
____—______
$10.000
$10,000
3.52
Total Direct Cost
28, 180
203,263
3,401 0
0 0 0
0 0
0 0
0 47,106 0
0
$284,313
Percent of Total
10.12%
71.49%
1.20% 0.00%
0.00% 0.00% 0,00%
.....0_1t763 _
0.00% 0.62% 0.00% 0.00%
0.00% 0.00%
0.00% 16.57% 0.00%
0.00%
100.00,
GUMM tNIS/ NUItS
1 _Note that the above costs DO NOT include all of the applicable mark_up_s for the total construction or �oject cost. Refer to the SUMMARY for these values.____________________________________________________________________________________________________________________—,________
i E. —co„ 0.c to ri A. 06ru Tan Page 1 of 1—v'aaMt.to:'o_
Project: East Renton Lift Station Elimination
PRELIMINARY - 60% DESIGN SUBMITTAL
Job #: 8235C10
Location: Renton, WA
Element: 01 12-inch SS STA 0+00 to 0+76
DETAILED COST ESTIMATE
Date : June 14, 2011
By: Tyler Whitehouse
Reviewed: Brian Casey
SPEC NO
......r_.
IF-
DESCRITIONRF
- P
QUANTI?l!
UNIT
UNIT COST,
SUBTOTAL`
Fin, -1 1,
TOTAL
Division 02 - Site Construction
02000
Plug Existing Pipeline and Abandon
2.00
LS
$394.82
$789.64
02000
Misc Connection Allowance
2.00
LS
$581.84
$1,163.68
02000
Misc Site Restoration 0+00 to 0+76
1.00
LS
$5,000.00
$5,000.00
02000
Trench Box per Day
10.00
Day
$60.78
$607.82
02000
Bypass Pumping SSMH 73
1.00
LS
$5,000.00
$5,000.00
02000
Bypass Pumping SSMH 72A
1.00
LS
$5,000.00
$5,000.00
02000
Sand Fill .
7.27
CY
$20.78
$151.07
02220
Core Drilling, 16" Diameter
1.00
LF
$305.47
$305
02240
10Hp Submersible Pump, 3" Elect.
10.00
DAY
$144.42
$1,444
02300
10 Cy Dump Truck, 10 Miles/Round.Trip
108.37
CY
$9.99
$1,083
02300
Imported Pipe Bed & Zone/Confined Structure Backfill,
Class B Material
24.63
CY
$84.85
$2,090
02300
Native Trench Backfill/Unconfined Struct. Bf, Class B
Material
0.00
CY
$18.29
$
02300
Cat 225 Trackhoe, 1Cy Bucket, Class C (Hard Digging), 0-
16' D
108.37
CY
$6.18
$670
02300
Imported Trench Backfill/Unconfined Struct. Bf, Class B
Material
83.74
CY
$41.86
$3,505
02580
Concrete Manhole Invert, Single Channel
1.00
EA
$327.62
$328
02580
Concrete Manhole Invert, Triple Channel
1.00
EA
$549.16
$549
Total
$27,686
Division 03 - Concrete
03000
Concrete Manhole Fill
21.82
CY
$155.85
$3,400.65
Total
$3,401
Division 15 - Mechanical
15265
12" Sdr-35 Pvc Sewer Pipe, In Trench
76.00
LF
$18.77
$1,426
Total
$1,426
Grand Total
$32,513
fin: Ee9 Renton Consbl lion C-1 Em mate.4s 01 12s h SS STA 0�00 to 0,76 Page 1 of 1 Form Rev: 200eJme
Project: East Renton Lift Station Elimination
PRELIMINARY - 60 % DESIGN SUBMITTAL
Job #: 8235C10
Location: Renton, WA
Element: 02 18-inch SS STA 0+76 to 8+58
DETAILED COST ESTIMATE
Date : June 14, 2011
By: Tyler Whitehouse
Reviewed: Brian Casey
R iPM
r Oo.
�DESCRIPTIONS
_-
Division 01 - General Conditions
01000
Monitoring and Maintenance
1.00
LS
$28,780.30
$28,780.30
Total
$28,780
Division 02 - Site Construction
02000
Misc Site Restoration 0+76 to 8+58
1.00
LS
$5,000.00
$5,000.00
02000
Misc Connection Allowance
2.00
LS
$581.84
$1,164
02000
Stream Diversion/Crossing Allowance
1.00
LS
$10,000.00
$10,000.00
02000
Utility Relocation Allowance
1.00
LS
$5,000.00
$5,000.00
02000
Trench Box per Day
25.00
Day
$60.78
$1,520
02000
Stream Bed Restoration
1.00
LS
$2,940.37
$2,940.37
02000
Buffer Restoration and Tree Replacement
1.00
LS
$17,382.47
$17,382.47
02000
TESC Allowance, Entire Project
1.00
LS
$10,000.00
$10,000.00
02220
Core Drilling, 22" Diameter
1.33
LF
$763.67
$1,018
02240
10Hp Submersible Pump, 3" Elect.
25.00
DAY
$144.42
$3,611
02300
Cut & Remove Tree, 8" Diameter
17.00
EA
$415.60
$7,065
02300
Cut & Remove Tree, 24" Diameter
14.00
EA
$675.35
$9,455
02300
10 Cy Dump Truck, 10 Miles/Round Trip
326.25
CY
$9.99
$3,261
02300
Remove Grass & Shrubs, 4" Depth To 1 Acre
0.54
AC
$1,154.03
$623
02300
Imported Pipe Bed & Zone/Confined Structure Backfill,
Class B Material
326.25
CY
$84.85
$27,683
02300
Native Trench Backfill/Unconfined Struct. Bf, Class B
Material
318.13
CY
$18.29
$5,819
02300
Cat 225 Trackhoe, 1 Cy Bucket, Class C (Hard Digging), 0-
16' D
815.63
CY
$6.18
$5,041
02300
Imported Trench Backfill/Unconfined Struct. Bf, Class B
Material
171.25
CY
$41.86
$7,168
02300
10 Cy Dump Truck, 10 Miles/Round Trip
171.25
CY
$9.99
$1,711
Total
$125,462
Division 15 - Mechanical
15267
18" Sdr 17 Hdpe Pipe In Open Trench
783.00
LF
$48.01
$37,591
Total
$37,591
Grand Total
$191,833
V, East Renton Construction Cost Estimate.bs-02 18i¢h SS STA 0+76 to 6+58 Page 1 of 1 F- Rev: 200anae
Ca-'
Project: East Renton Lift Station Elimination
PRELIMINARY - 60% DESIGN SUBMITTAL
Job #: 8235C10
Location: Renton, WA
Element: 03 15-inch SS STA 8+58 to 10+31
DETAILED COST ESTIMATE
Date : June 14, 2011
By: Tyler Whitehouse
Reviewed: Brian Casey
rg
NOyIn
kIS
i INI
CRIPTION f -
QUANTITYt7NIT
UNlT COST
fir'SPEC SUBT07A� x�
=�"5TF
Division 02 - Site Construction
02000
Misc Site Restoration 8+58 to 10+31
1.00
L5
$5,000.00
$5,000.00
02000
Misc Connection Allowance
2.00
LS
$581.84
$1,164
02000
Trench Box per Day
20.00
Day
$60.78
$1,216
02220
Demo Pvc Pipe From Trench, 4" - 18" Incl. Fittings
173.00
LF
$4.34
$751
02220
Asphalt Pavement Cutting
1,432.00
inFT
$.78
$1,116
02220
Core Drilling, 20" Diameter
1.00
LF
$643.66
$644
02220
Remove 4"-6" Asphalt Pavement
994.75
SF
$.67
$670
02240
10Hp Submersible Pump, 3" Elect.
20.00
DAY
$144.42
$2,888
02300
10 Cy Dump Truck, 10 Miles/Round Trip
228.26
CY
$9.99
$2,281
02300
Imported Pipe Bed & Zone/Confined Structure Backfill,
Class B Material
66.08
CY
$84.85
$5,607
02300
Imported Trench Backfill/Unconfined Struct. Bf, Class B
Material
162.19
CY
$41.86
$6,789
02300
Cat 225 Trackhoe, 1Cy Bucket, Class C (Hard Digging), 0-
16' D
228.26
CY
$6.18
$1,411
02742
4" Pavement Replacement On 6" Abc Over Trench
994.75
SF
$6.03
$5,997
Total
$35,534
Division 15 - Mechanical
15265
15" Sdr-35 Pvc Sewer Pipe, In Trench
173.00
LF
$46.76
$8,089
Total
$8,089
Grand Total
$43,622
fln EeM Rent." C—t" . Co EMi..t" m a3 15r�rn ss STa 8.58 to 10.31 Page 1 of 1 Form Rev: 200eJ—
DETAILED COST ESTIMATE
Project: East Renton Lift Station Elimination PRELIMINARY - 60% DESIGN SUBMITTAL
Job #: 8235C10 Date : June 14, 2011
Location: Renton, WA By: Tyler Whitehouse
Element: 04 48" Dia MH 5314 086 Reviewed: Brian Casey
NOt)E5CRIPTtON
M''
QUAN
UNIT
UNIT COST
SUBTOTAL
=SPEC
t TOTAL
Division 02 - Site Construction
48" X 8' Deep Precast Manhole, No Ring & Cover, No
02580 Earthwork 1.00
EA
$2,149.42
$2,149
02580 48" Precast Manhole, Xtra Depth Over 8' 1.00
VLF
$284.65
$285
02580 48" Manhole Precast Slab Top Or Bottom, 8" Thick 1.00
EA
$375.16
$375
02580 24" Dia. X 350 Lb Watertight Manhole Frame & Cover 1.00
EA
$639.70
$640
02580 2" Precast Grade Ring, 4-Piece, 20" - 26" Diameter 1.00
EA
$566.47
$566
02580 Concrete Manhole Invert, Single Channel 1.00
EA
$327.62
$328
02580 Polypropylene MH Steps 9.00
EA
$26.49
$238.45
Total
$4,581
Division 09 - Finishes
09000 MH Coating, High Solids Urethane 113.10
SF
$15.59
$1,762.66
Total
$1,763
Grand Total
$6,344
tin: East Renton Construction Cost Es—te,e 38' Dia W 5314 086 Page 1 of 1 Form Rev 2ooe,,.,e
DETAILED COST ESTIMATE
Project: East Renton Lift Station Elimination PRELIMINARY - 60% DESIGN SUBMITTAL
Job #: 8235C10
Date : June 14, 2011
Location: Renton, WA
By : Tyler Whitehouse
Element: 05 Lift Station Demolition
Reviewed: Brian Casey
SPEC NO
DESCRIPTIaN '
UNITx
UNIT COSTVSUBTOTAI
•.
TOTAL
g4UANTITY
Division 02 - Site Construction
02000 Miscellaneous Site and Lift Station Demolition
1.00
LS $10,000.00 $10,000.00
Total
$10,000
Grand Total
$10,000
fln: EaL Renton Cotutr Pion Cost Est4 ate.ds-05 LA Station Cemoktun Page 1 of 1 - form Rer 2008J—
EAST RENTON LIFT STATION ELIMINATION PROJECT
WORKING PROJECT SCHEDULE
ask Name
T RENTON LIFT STATION ELIMINATION PROJECT
K 1 - PROJECT MANAGEMENT
7m G - VIIVML Ur-olu 9 UCVCLVr1V1r_N I
City Obtain K.C. Right of Use Permit
Task 2.1: Supplemental Survey
Task 2.2 - Geotechnical Exploration, Review, and Assistance
Task 2.3 - Environmental Permitting Services
Determine Fish Presence and Develop Stream Crossing Method Memo
Submit Fish Presence and Stream Crossing Memo
Task 2.3.1 - King County Permit Applications
Prepare Draft Permitting Submittal
Submit Draft Permitting Submittal
City/Carollo Review and Comment
Prepare Final Permitting Submittal to K.C.
Submit Final Permitting Submittal to K.C.
Agency Repponse: For Clearing and Grading Permit
Task 2.3.2 - JARPA
Prepare Draft JARPA and No Effect Letter
Submit Draft JARPA and No Effect Letter
City/Carollo Review and Comment
Prepare Final JARPA and No Effect Letter
Final JARPA and No Effect Letter to WDFW and Corps
Agency Response: HPA from WDFW
Agency Response: Corps
Task 2.3.3 - SEPA Checklist
Prepare Draft SEPA Checklist
Submit Draft SEPA Checklist
City/Carollo Review and Comment
Prepare Final SEPA Checklist
Final SEPA Checklist to City
Task 2.3.4 - Mitigation Plan
Prepare Draft Mitigation Plan
Submit Draft Mitigation Plan
City/Carollo Review and Comment
Prepare Final Mitigation Plan for inclusion in K.C. Permit submittal
Final Mitigation Plan to City
Task 2.3.5 - Meetings and Coordination
Pre -Application Meeting w' K.C. DDES for Clearing and Grading Permit
K.C. DDES Application Submittal Meeting (Subject to K.C.)
City of Renton Permitting
Prepare Draft CAO Exemption Letter
City/Carollo Review and Comment
Prepare Final CAO Exemption Letter
Final CAO Exemption Letter to City
Targeted Drainage Review/Permit (TDR)
Prepare TDR Submittal for K.C. Review
Submit TDR to K.C.
K.C. Review and Comment
Incorporate K.C. Review Comments
Task 2.4 - 60 Percent Design Development
60 Percent Design Development
Submit 60 Percent Design Submittal
Duration Start Finish rter 3rd Quarter 4th Quarter
I May I Jun_=Jul- Sep Oct _ t
0 days Mon 9/27/10 Mon 9127/1
428 days
397 days
15 days
30 days
40 days
181days
45 days
0 days
65 days
1 wk
0 days
2 wks
2 wks
0 days
2 mons
100 days
4 wks
0 days
2 wks
2 wks
0 days
2 mons
3 mons
30 days
2 wks
0 days
2 wks
2 wks
0 days
50 days
6 wks
0 days
2 wks
2 wks
0 days
121 days
0 days
0 days
25 days
2 wks
1 wk
2 wks
0 days
75 days
5 days
0 days
20 days
5 days
41 days
31 days
0 days
Mon 9/27110
Mon 9127/10
Mon 9/27/10
Mon 12/6110
Mon 11/29/10
Tue 1125/11
Tue 3/1/11
Mon 5/2/11
Wed 618/11
Wed 6/8/11
Tue 6/14/11
Wed 6/15/11
Wed 6/29/11
Tue 7/12/11
Wed 7/13/11
Wed 5/18/11
Wed 5/18/11
Tue 6/14/11
Wed 6/15111
Wed 6/29/11
Tue 7/12/11
Wed 7/13/11
Wed 7/13/11
Wed 6/1/11
Wed &1111
Tue 6/14/11
Wed 6/15/11
Wed 6129/11
Tue 7/12/11
Wed 5/4/11
Wed 5/4/11
Tue 6/14/11
Wed 6/15/11
Wed 6/29/11
Tue 7/12/11
Tue 1/25/11
Tue 1125/11
Tue 7/12/11
Wed 6/15/11
Wed 6/15/11
Wed 6129/11
Wed 7/6/11
Tue 7/19/11
Wed 6/29/11
Wed 6/29/11
Tue 7/5/11
Wed 7/6/11
Wed 106111
Tue 5/3/11
Tue 5/3/11
Tue 6/14/11
Wed 5/16/12
Tue 413112�
Fri 10/1511 G
Fri 1114/11 i
Fri 1/21111
Tue /11
512
Mon 5/2/11
Mon 5/2/11 512
Tue 9/6/11
Tue 6/14/11
Tue 6/14/11 6114
Tue 6128/11
Tue 7/12/111
Tue 7/12/11: 7112
Tue 9/6/11
i
Tue 10/4/111
Tue 6/14/11 _
Tue 6/14/11H
Tue 6/28/11'
Tue 7/12/11
Tue 7/12/11 7112
Tue 916/11
Tue 10/4/11
Tue 7112/11
Tue 6/14/11
Tue 6/14/11
Tue 6/28/11
Tue 7/12/11.
Tue 7/12111 7/12
Tue 7112111 VI
Tue 6/14/11'
Tue 6114/111
Tue 6/28/11:
Tue 7/12/11
Tue 7/12/11 7112
Tue 7/12111:oi=iiiiiiiiiiii Now
Tue 1/25/11'
Tue 7/12/11 7/12
Tue 7119111
Tue 6/28/11
Tue 715/11
Tue 7119/11.
Tue 7/19/11 ®7/19
Tue 10/11/11:
Tue 7/5/111
Ak
Tue 7/5/11 ♦715
Tue 8/2/111
Tue 10/11/1V
Tue 6/28/11
Tue 6/14/11'
Tue 6/14/11; 4
Project: E. Renton LS Elimination Prj I Task Progress Summary External Tasks Deadline
Date: Fri 6/10/11 Split Milestone C Project Summary External Milestone
Page 1
EAST RENTON LIFT STATION ELIMINATION PROJECT
WORKING PROJECT SCHEDULE
Task Name
Duration
Start
Finish rter 3rd Quarter l4th Quarter
1 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter
_
M_ay I Jun Jul Aug Sep Oct Nov
Dec Jan I Feb Mar Apr May Jun Jul Aug Sep Oct Nov
60 Percent Submittal City Review and Comment, Await Permitting Review
2 wks
Wed 6/15/11
__
Tue 6/28/11,
_
Task 2.5 - 90 Percent Design Development (Final Review Submittal)
120 days
Wed 1015/11
Tue 3/20/121
90 Percent Design Development and Internal Review
20 days
Wed 10/5/11
Tue 11/1/11
Submit 90 Percent Design Submittal
0 days
Tue 11/1/11
Tue 11/1/11 V 11/1
90 Percent Submittal City Review and Comment
10 days
Wed 11/2/11
Tue 11/15/11,
King County Parks Special Use Permit
90 days
Wed 11/16/11
Tue 3/20/12
Task 2.6 - Final (Contract Document) Design Development
10 days
Wed 3/21/12
Tue 413/12,
Contract Document Development
10 days
Wed 3/21/12
Tue 4/3/12
Contract Documents Submittal
0 days
Tue 4/3/12
Tue 4/3/121
_
4
TASK 3 - BID ASSISTANCE / BID PERIOD
35 days
Wed 4/18/12
Tue 6/5/12I
Advertise
10 days
Wed 4/18/12
Tue 5/1/12
Open Bids
0 days
Tue 5/1/12
Tue 5/1/12
511
Evaluate Bids, Prepare Contract Docs for Successful Bidder
10 days
Wed 5/2/12
Tue 5/15/121
Award Contract
0 days
Tue 5/15/12
Tue 5/15112
5/15
Successful Bidder Reqs to City (Execution of Contract)
10 days
Wed 5/16/12
Tue 5129/12
Signed Contract
5 days
Wed 5/30112
Tue 6/5/12
NTP
0 days
Tue 6/5/12
Tue 6/5/121
615
Pre -Construction Meeting
0 days
Tue 6/5/12
Tue 6/5/12i
6/5
TASK 4 - ASSISTANCE DURING CONSTRUCTION
105 days
Wed 616/12
Tue 10130/12:
Task 4.1 - City Submittal Review
20 days
Wed 6/6/12
Tue 7/3112
Task 4.2 - Request for Information (RFIs)
5 days
Wed 6/6/12
Tue 6/12/121
Task 4.3 - Field Inspection
70 days
Wed 6127/12
Tue 10/2/4
Mobilization
3 days
Wed 6/27/12
Fri 6/29/121
Site Preparation
3 days
Mon 7/2112
Wed 7/4/12
Install 15" SS in 148th Place SE (STA 8+58 to STA 10+31)
14 days
Thu 715/12
Tue 7/24/121
Remove 173 LF of Existing 8" SS and Existing MH 5314 086
5 days
Thu 7/5/12
Wed 7/11/12i
_
Install 173 LF of 15" SS and New MH 5314 086
5 days
Thu 7/12/12
Wed 7/18/12
Pipeline Testing
1 day
Thu 7/19/12
Thu 7119/12
Site Restoration Improvements
3 days
Fri 7/20/12
Tue 7/24/12
Install 18" SS through Maplewood Park (STA 0+76 to STA 8+58)
20 days
Wed 7125/12
Tue 8/21112
Clearing and Tree Removal (30' wide path, —2,600 SY)
5 days
Wed 7/25/12
Tue 7/31/12
Install 18" SS from STA 8+58 to STA 2+00, 658 LF
8 days
Wed 8/1/12
Fri 8/10/12;
Divert Stream and Install Remaining 124 LF of 18" SS to Existing MH 5314 07E
4 days
Mon 8/13/12
Thu 8/16/12'
Pipeline Testing
2 days
Fri 8/17/12
Mon 8120/12
Install Temporary Stream Crossing as Required
1 day
Tue 8121/12
Tue 8/21/121,
Install 12" SS near existing lift station (STA 0+00 to 0+76)
10 days
Wed 8/22/12
Tue 9/4112
Install 76 LF of 12" SS
2 days
Wed 8/22/12
Thu 8/23112;
♦j
Pipeline Testing
1 day
Fri 8/24/12
Fri 8/24/12'
Install Temporary Bypass Pumping Systems and Test
2 days
Mon 8127/12
Tue 8/28/12`
Fill MH 5314 080 and MH 5314 079 and Existing 12" SS
3 days
Wed 8129/12
Fri 8/31/12
Confirm Operation of New Sewer Pipeline, Decom. Bypass Systems
1 day
Mon 9/3/12
Mon 913/127
Site Restoration Improvements
1 day
Tue 9/4/12
Tue 9/4/12
1
Decommission and Miscellaneous Demolition of Existing Lift Station
5 days
Wed 9/5/12
Tue 9/11/12
Substantial Completion
0 days
Tue 9/11/12
Tue 9/11/121
9111
Stream Restoration and Wetland Mitigation Planting Improvements
10 days
Wed 9/12/12
Tue 9/25/12
Final Inspection and Physical Completion
5 days
Wed 9/26112
Tue 10/2/12
Final Acceptance
0 days
Tue 10/2/12
Tue 10/2/12
10/2
Task 4.4 - Record Drawings
15 days
Wed 10/10112
Tue 10/30112
Record Drawing Development
15 days
Wed 10/10/12
Tue 10/30/12'
Project Completion
0 days
Tue 10/30/12
Tue 10/30/12
10/30
Protect: E. Renton LS Elimination Prj Task Progress Summary External Tasks �--- Deadline b
Date: Fri 6/10/11 Split Milestone C Project Summary External Milestone
Page 2
June 14, 2011
8235C.10
Renton City Hall — 5th Floor
1055 South Grady Way
Renton, WA 98057
Attention: Dave Christensen, Wastewater Utility Supervisor
Subject: East Renton Lift Station Elimination Project:
60% East Renton Lift Station Elimination Design Submittal Package
Dear Dave:
The enclosed documents include the 60 percent design submittal for the East Renton Lift
Station Elimination project and Draft versions of the Environmental Permitting Services
deliverables. Also enclosed is a legal description for which to obtain an easement for the site
access drive. The final geotechnical report prepared by HWA is also included for your files.
Please contact us if you have any questions or comments on the 60 percent design submittal
package.
Sincerely,
CAROLLO ENGINEERS, P.C.
Lara Kammereck
LRK:tIh
Enclosures: 2 copies each of the following:
60% Drawings
60% Specifications
60% Construction Cost Estimate
60% Project Schedule
Access Easement
Final Geotechnical Report
1 copy each of the following:
Draft King County Permit Submittals
Draft JARPA
Draft SEPA Checklist
Draft Mitigation Plan
Revised June 2011 Wetland, Stream, and Wildlife Study
1218 Third Avenue, Suite 1600, Seattle, Washington 98101
P. 206.684.6532 F.206.903.0419
pw:\\Documents\Client\WA\Renton\8235C101Correspondence\Client\Christensen L40110614.docx carollo.com
Denis Law
Mayor
January 15, 2014
Mr. Charles Romo
322 Pasco Drive NE
Renton, WA 98059
iTity of
Public Works Department - Gregg Zimmerman, R E., Administrator
RE: Keys to Abandoned East Renton Lift Station
Dear Mr. Romo:
Here are the keys to the locks on the gate and the doors of the abandoned East Renton Lift
Station site for the use of the Homeowners Association, as owner of the property.
Thank you for your assistance and patience with the project. If you have any questions, please
contact me at 425-430-7206 or by email at mbenoit@rentonwa.gov.
Sincerely,
Michael A. Benoit
Wastewater Utility Project Manager
Enclosure