Loading...
HomeMy WebLinkAboutWWP273580CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 10-142 — Westview Lift Station Upgrades C.O.# 1 CONTRACTOR: Advanced Construction, Inc. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: ITEM Additional Quantities Under This Change Order Unit Quantit, Unit Price Total Price 003 NEW ITEM: Extra work to pick up, transport, and install LS 1 $3,725.00 $3,725.00 replacement hatches at East Renton Lift Station as a lump sum item per contractor's bid. Advanced Construction's bid was the low bid submitted as an email bid solicited from three contractors on February 9, 2011 and due February 18, 2011. Work done under this change order to replace doors stolen and will be paid for through account: 502.000000.005.514.74.46.035 (property claims — Wastewater) Subtotal $3,725.00 9.5% Sales Tax 353.88 Total $4,078.88 ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE THIS ORDER ESTIMATED CONTRACT TOTAL AFTER CHANGE $101,835.00 $101,835.00 $4,078.88 $105,913.88 CIr,A14T1 IRGC- Contractor: Project Engineer: Approved By: (Utilities System Director) W:\WWP-27-3536 Westview Lift Station Upgrades\C0-1.D0C Date: Date: Date: PUBLIC WORKS DEPARTMENT p o cftyof M E M O R A N D U M DATE: February 28, 2011 TO: File FROM: Michael Benoit, Project Manager SUBJECT: East Renton Lift Station Hatch Replacement The City of Renton needs to replace the hatches that were stolen from the East Renton Lift Station. The doors have been manufactured and are available at LW Products in Woodinville. The City requested bids from three contractors for the installation of the hatches. The three contractors were: Advanced Construction, Inc. (A.J. Smith) Kamins Construction (Chad Kamins) Shoreline Construction (Doug Suzuki) The City received two bids. Kamins Construction chose not to submit a bid. The two bids were: Advanced Construction: Bid $3,725.00 Tax $ 353.88 Total $4,078.88 Shoreline Construction Bid $5,370.00 Tax $ 510.15 Total $5,880.15 The City is awarding the bid to Advanced Construction in the total amount of $4,078.88. For the purposes of contracting and payment, this work will be done as a change order to the construction contract Advanced Construction has with the City for the rehabilitation of the Westview Lift Station. w:\wwp-27-xxxx east renton lift station hatch repairs\bid award.doc Michael A Benoit From: Michael A Benoit Sent: Thursday, February 10, 2011 12:34 PM To:'ajsm ith @ advancedconstructioninc. net'; Suzuki, Doug; 'Chad Kamins' Cc: Michael A Benoit Subject: City of -Renton Request -for -Bid - Attachments: Img_0892a.jpg; Img_0887aJpg; East Renton Site.PDF February 9, 2011 City of Renton Request for Bid: Installation of Replacement Doors — East Renton Lift Station The access hatches at Renton's East Renton Lift Station have been stolen / damaged. There does not appear to be any damage to the frames. Renton has worked with LW Products of Woodinville to have replacement hatches constructed. The new hatches are constructed so the skirt sits inside the existing frame and uses stainless steel wedges to anchor them in place. Attached are photos of the two hatches to be repaired. You may contact LW Products to look at the new hatches and talk to them about installation. LW Products Company 8333 — 219th Street SE, Building A Woodinville, WA (425) 483-0300 If you would like to look at the lift station site, please let us know. The site is located at 5835 SE 2"d Court. It is the red square at the bottom left of the attached map and is a fenced enclosure accessed via the gravel driveway from 2"d Court. We would appreciate your company submitting an e-mail bid for the installation of the replacement hatches. The lump sum bid should include all time, materials, and equipment to: • Pick up and transport the hatches to the site • Remove and dispose of the remaining parts of the existing hatches • Install the new hatches inside the old frames We will need the bid e-mailed back to.mbenoit@rentonwa.gov by 4:00 PM Friday February 18, 2011. Thank you for your time. Project Manager Wastewater Utility City of Renton (425) 430-7206 VA T Michael A Benoit From: AJ Smith [ajsmith@advancedconstructioninc.net] Sent: Monday, February 14, 2011 8:48 AM To: Michael A Benoit Subject: RE: City of Renton Request for Bid - Thanks, then our bid includes no sales tax. A.J. Smith Advanced Construction, Inc. 4640 Campus Place, Suite 150 Mukilteo, WA 98275 425-493-1826 425-493-1827 FAX aismith@advancedconstructioninc.net From: Michael A Benoit [mailto:Mbenoit(g'bRentonwa.govl Sent: Monday, February 14, 2011 8:43 AM To: AJ Smith Subject: RE: City of Renton Request for Bid - This is a sewer utility project not a 171. So we pay the lump sum price plus the sales tax on that amount. I am going to send out a general e-mail to all 3 contractors for clarification on the bid and tax. N1LCI101-OL A. 2vLD Project Manager Wastewater Utility City of Renton (425) 430-7206 From: AJ Smith [maiIto: ajsmith@advancedconstruction inc. netl Sent: Monday, February 14, 2011 8:29 AM To: Michael A Benoit Subject: RE: City of Renton Request for Bid - Is this a rule 171 project A.J. Smith Advanced Construction, Inc. 4640 Campus Place, Suite 150 Mukilteo, WA 98275 425-493-1826 425-493-1827 FAX ajsmith @advancedconstructioninc.net From: Michael A Benoit [mailto:Mbenoit(d)Rentonwq.. o Sent: Monday, February 14, 2011 7:56 AM To: AJ Smith Subject: RE: City of Renton Request for Bid - Om Just for clarification, does your lump sum bid include the 9.5% sales tax? NALi Gt Project Manager Wastewater Utility City of Renton (425) 430-7206 From: AJ Smith ImaiIto: ajsmith@)advancedconstructioninc.net] Sent: Friday, February 11, 2011 9:55 AM To: Michael A Benoit Subject: RE: City of Renton Request for Bid - Advanced Construction would be able to provide these services for the lump sum price of $3725.00 A.J. Smith Advanced Construction, Inc. 4640 Campus Place, Suite 150 Mukilteo, WA 98275 425-493-1826 425-493-1827 FAX ajsmith@advancedconstructioninc.net From: Michael A Benoit Imailto:Mbenoit('ORentonwa.gov] Sent: Friday, February 11, 2011 9:18 AM To: A] Smith Subject: RE: City of Renton Request for Bid - Yes The valve vault (picture with both doors missing) and wet well (picture with one door missing). Mike B From: A] Smith [maiIto: ajsmith(d)advancedconstructioninc.net] Sent: Friday, February 11, 2011 9:12 AM To: Michael A Benoit Subject: RE: City of Renton Request for Bid - Am I understanding correctly that there are two vaults that need hatch replacement?? A.J. Smith Advanced Construction, Inc. 4640 Campus Place, Suite 150 Mukilteo, WA 98275 425-493-1826 425-493-1827 FAX a'smith@advancedconstructioninc.net From: Michael A Benoit [mailto:Mbenoit(&Rentonwa.govl Sent: Thursday, February 10, 2011 12:34 PM To: AJ Smith; Suzuki, Doug; 'Chad Kamins' Cc: Michael A Benoit Subject: City of Renton Request for Bid - February 9, 2011 City of Renton Request for Bid: Installation of Replacement Doors — East Renton Lift Station The access hatches at Renton's East Renton Lift Station have been stolen / damaged. There does not appear to be any damage to the frames. Renton has worked with LW Products of Woodinville to have replacement hatches constructed. The new hatches are constructed so the skirt sits inside the existing frame and uses stainless steel wedges to anchor them in place. Attached are photos of the two hatches to be repaired. You may contact LW Products to look at the new hatches and talk to them about installation. LW Products Company 8333 — 219th Street SE, Building A Woodinville, WA (425) 483-0300 If you would like to look at the lift station site, please let us know. The site is located at 5835 SE 2nd Court. It is the red square at the bottom left of the attached map and is a fenced enclosure accessed via the gravel driveway from 2nd Court. We would appreciate your company submitting an e-mail bid for the installation of the replacement hatches. The lump sum bid should include all time, materials, and equipment to: • Pick up and transport the hatches to the site • Remove and dispose of the remaining parts of the existing hatches • Install the new hatches inside the old frames We will need the bid e-mailed back to.mbenoit@rentonwa.gov by 4:00 PM Friday February 18, 2011. Thank you for your time. Project Manager Wastewater Utility City of Renton (425) 430-7206 Shoreline Construction Co. PO Box 358 Woodinville, WA 98072 Ph. (206) 483-0600 Fax (360) 668-5133 04/15/2004 To: Mike Benoit Project: SWR - Hatch Installation Bid Date: 02/18/2011 Unit Estimated Unit Extended Item Description Measure Quantity Price Amount 1 Pick up Hatches From LW Products and Install Is 1.00 $5,370.00 $5,370.00 0 0 1.00 $0.00 $0.00 Total $5,370.00 WSST 9.50% 5� 10.15 Total With WSST $5,tL0 Quote Includes Pick up doors at LW Products Install Owner furnished hatch doors onto existing frame v. L W Products Co. 8333 219th St. SE, Building A Woodinville WA 98072 (425) 483-03 00, fax(425) 485-2058 BILL TO City of Renton, Utility Systems Attn: Michael Benoit 1055 So. Grady Way Renton Wa 98057-3232 R A C E ' E-- CI U 11!,lTY SY 1 Invoice DATE INVOICE # 3/ 1 /2011 13272 P.O. NO. TERMS PROJECT OUR ORDER # net 30 37 DESCRIPTION CITY RATE AMOUNT 71 "x75-1/2" Double leaf Custom LW access doors, 2 5,316.00 10,632.00T hinged opposing 75-1/2" sides, drain to outside Doors ready for will call on 2/09/11 For: East Renton Lift Station Hatch Replacement Sales Tax 9.50% 1,010.04 Thank you Total $11,642.04 Past due invoices 1.5% sery chg per month. If purchaser fails to pay within terms & seller retains an attorney to collect, purchaser agrees to pay attomey fees & collection costs whether or not a PUBLIC WORKS DEPARTMENT D CJ Mltyof M E M O R A N D U M DATE: December 16, 2010 TO: File j FROM: Gregg Zimmermarir4"ic Works Administrator STAFF CONTACT: David Christensen, Wastewater Utility Supervisor SUBJECT: East Renton Lift Station Hatch Replacement When constructing new or replacement sanitary sewer lift stations, specifications call for the use of heavy duty access hatches manufactured by LW Products. As part of the replacement of the access hatches stolen from the East Renton Lift Station, we have contacted LW Products of Woodinville, Washington for a bid. As there are no other suppliers of LW hatches in this region to provide bids, we are accepting their estimated bid. h:\file sys\wwp - wastewater\wwp-27-xxxx east renton lift station hatch repairs\memo to file.doc\MABtp Carrie Olson From: Michael A Benoit Sent: Friday, March 04, 2011 4:23 PM To: Carrie Olson Subject: New File Request Carrie, If you would please, a new 1" side tab only file for: WWP-27-3580 East Renton Lift Station Hatch Replacement Permanent Correspondence Thanks Mt CkPeL A. 7P-evo%t Project Manager Wastewater Utility City of Renton (425) 430-7206