HomeMy WebLinkAboutWWP273626 (5)Project : Lind Avenue Lift Station Replacement BID DATE: April 16, 2013 Item No. Desc Unit Est. Quant 1 Mobilization & Demobilization Lump Sum 1 2 Site Work and Utilities Lump Sum 1 3 Traffic Control Lump Sum 1 4 Trench Safety and Shoring Lump Sum 1 5 Dewatering Lump Sum 1 6 Lift Station.Structural Lump Sum 1 7 Electrical Building Structural Lump Sum 1 8 Lift Station Pumps and Motors Lump Sum 1 9 Mechanical Lump Sum 1 10 Electrical Lump Sum 1 11 Lift Station Finishes Lump Sum 1 12 Operation and Maintenance Manuals and On -Site Owner Training Lump Sum 1 13 Construction Records Lump Sum 1 14 Abandonment of Existing Lift Station Lump Sum 1 15 Pedestrian Crossing System Lump Sum 1 City of Renton Engineers Estimate Unit Bid Price Amount , Equity; Builder,"s LLCM-' lUrilt - r `06 iP,rlce _',, 5� :fA"m0urA:_,;."„ McClure and Sons, Inc. Unit Bid Price Amount 31,000:00 31,000.00 , ~ 401000400� ­"640Y000700 36,000.00 36,000.00 99,000.00 99,000.00 ' 1(6,1,V000.00� �1�6p��000 00 75,000.00 75,000.00 10,000.00 10,000.00 '1i0 OOOY001 �oO�OOOY00 15,000.00 15,000.00 15,000.00 15,000.00 �t13�000?;00;+ �,�. XJ,060Y00 25,000.00 25,000.00 29,000.00 29,000.00 (66000fOQ, " (oOOOYOQ 50,000.00 50,000.00 169,000.00 169,000.00 "' ;(84;Q00'-00 "°.:rM4P00'0 125,000:00 125,000.00 25,000.00 25,000.00 241060f00 j24rf000�00 50,000.00 50,000.00 46,000.00 46,000.00 (45 000YQOi �4510OO;�QO 60,000.00 60,000.00 48,000.00 48'000.00 120ti00011001 20�000?00 70,000.00 70,000.00 147,000.00 147,000.00 5161184000yao 151r8i000GOp 100,942.00 100,942.00 17,000.00 17,000.00 `' f271OQ0�001 f27x00QfOQ 40,000.00 40,000.00 2,500.00 2,500.00 ;12$OOX001 f2x500`00 2,500.00 2,500.00 5,000.00 5,000.00 0'0� =` �5f00,0OQ 5,000.00 5,000.00 10,000.00 10,000.00 �' t8�000 OQ VOW00 1,000.00 1,000.00 23,000.00 23,000.00 14�300�001 il`4 300ti00 10,000.00 10,000.00 Subtotal 676,500.00 (637 665442.00 Tax 9.5% 64,267.50 ? (60;5911f00 63,216.99 Total 740,767.50 98?3941 0 728,658.99 Project : Lind Avenue Lift Station Replacement BID DATE: April 16, 2013 Item Unit Est. No. Description 1 Mobilization,& Demobilization Lump Sum 2 Site Work and Utilities Lump Sum 3 Traffic Control Lump Sum 4 Trench Safety and Shoring Lump Sum 5 Dewatering Lump Sum 6 Lift Station Structural Lump Sum 7 Electrical Building Structural Lump Sum 8 Lift Station Pumps and Motors Lump Sum 9 Mechanical Lump Sum 10 Electrical Lump Sum 11 Lift Station Finishes Lump Sum 12 Operation and Maintenance Manuals and On -Site Owner Training Lump Sum 13 Construction Records Lump Sum 14 Abandonment of Existing Lift Station Lump Sum 15 Pedestrian Crossing System Lump Sum 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Harper Construction, Inc. Unit Bid Price Amount 31,400.00 31,400.00 142,300.00 142,300.00 15,900.00 15,900.00 13,500.00 13,500.00 71,800.00 71,800.00 97,900.00 97,900.00 40,000.00 40,000.00 49,600.00 49,600.00 47,000.00 47,000.00 128, 800.00 128, 800.00 30,500.00 30,500.00 2,500.00 2,500.00 5,000.00 5,000.00 9,800.00 9,800.00 21,400.00 21,400.00 707,400.00 67,203.00 774,603.00 R. L. Alia Unit Bid Price Amount 20,000.00 20,000.00 230,000.00 230,000.00 3,500.00 3,500.00 1,000.00 1,000.00 60,000.00 60,000.00 75,000.00 75,000.00 25,000.00 25,000.00 50,000.00 50,000.00 75,000.00 75,000.00 115, 000.00 . 115,000.00 20,000.00 20,000.00 2,500.00 2,500.00 5,000.00 5,000.00 5,000.00 5,000.00 25,000.00 25,000.00 712,000.00 67,640.00 779, 640.00 ROAD CONSTRUCTION Unit Bid Price Amount 64;900.00 64,900.00 117, 000.00 117, 000.00 20,000.00 20,000.00 16,000.00 16,000.00 115, 000.00 115, 000.00 132, 000.00 132, 000.00 47,000.00 47,000.00 55,000.00 55,000.00 30,000.00 30,000.00 154,000.00 154,000.00 18,000.00 18,000.00 2,500.00 2,500.00 5,000.00 5,000.00 6,000.00 6,000.00 15,500.00 15,500.00 797,900.00 75, 800.50 873,700.50 Project : Lind Avenue Lift Station Replacement BID DATE: April 16, 2013 Item No. Description Unit Est. Quani 1 Mobilization & Demobilization Lump Sum 1 2 Site Work and Utilities Lump Sum 1 3 Traffic Control Lump Sum 1 4 Trench Safety and Shoring Lump Sum 1 5 Dewatering Lump Sum 1 6 Lift Station Structural Lump Sum 1 7 Electrical Building Structural Lump Sum 1 8 Lift Station Pumps and Motors Lump Sum 1 9 Mechanical Lump Sum 1 10 Electrical Lump Sum 1 11 Lift Station Finishes Lump Sum 1 12 Operation and Maintenance Manuals and On -Site Owner Training Lump Sum 1 13 Construction Records Lump Sum 1 14 Abandonment of Existing Lift Station Lump Sum 1 15 Pedestrian Crossing System Lump Sum 1 rwest Construction, Inc. I & E Construction, Inc. Rodarte Construction Inc. Unit Price Bid Amount Unit Price Bid Amount Unit Price Bid Amount 68,400.00 68,400.00 67,000.00 - 67,000.00 63,000.00 63,000.00 170,000.00 170,000.00 202,944.00 202,944.00 155,000.00 155,000.00 15,000.00 15,000.00 11,000.00 11,000.00 9,000.00 9,000.00 50,000.00 50,000:00 21,582.00 21,582.00 125,000.00 125,000.00 50,000.00 50,000.00 78,381.00 78,381.00 165,000.00 165,000.00 140,000.00 140,000.00 82,749.00 82,749.00 85,000.00 85,000.00 65,000.00 65,000.00 66,992.00 66,992.00 45,000.00 45,000.00 75,000.00 75,000.00 52,232.00 52,232.00 50,000.00 50,000.00 45,000.00 45,000.00 45,160.00 45,160.00 30,000.00 30,000.00 193, 000.00 193, 000.00 112, 950.00 112, 950.00 120, 000.00 120, 000.00 3,000.00 3,000.00 29,943.00 29,943.00 23,000.00 23,000.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 5,000.00 5,000.00 5,000.00 •5,000.00 5,000.00 5,000.00 10,000.00 10,000.00 7,688.00 7,688.00 6,500.00 6,500.00 15,000.00 15,000.00 30,022.00 30,022.00 16,000.00 16,000.00 906,900.00 816,143.00 900,000.00 86,155.50 77,533.59 85,500.00 993,055.50 893,676.59 985,500.00 Project : Lind Avenue Lift Station Replacement BID DATE: April 16, 2013 Item Unit No.. Description 1 ivioomzauon a vernuuwzauun �Ul l lv . Ul ll 2 Site Work and Utilities Lump Sum 3 Traffic Control Lump Sum 4 Trench Safety and Shoring Lump Sum 5 Dewatering Lump Sum 6 Lift Station Structural Lump Sum 7 Electrical Building Structural Lump Sum 8 Lift Station Pumps and Motors Lump Sum 9 Mechanical Lump Sum 10 Electrical Lump Sum 11 Lift Station Finishes Lump Sum 12 Operation and Maintenance Manuals and On -Site Owner Training Lump Sum 13 Construction Records Lump Sum 14 Abandonment of Existing Lift Station Lump Sum 15 Pedestrian Crossing System Lump Sum Johansen Excavating, Inc Est. Unit janifty Price 1 1 1 1 1 1 1 1 1 1 1 1 1 1 87,150.00 120,120.00 46,425.00 131,350.00 144,000.00 84,825.00 54,500.00 46,885.00 49,850.00 120,000.00 22,500.00 2,500.00 5,000.00 25,965.00 10,745.00 Average Bid Bid Unit Bid Amount Price Amount 87,150.00 43,450.00 43,450.00 120,120.00 149,216.67 149,216.67 46, 425.00 13, 233.33 13, 233.33 131,350.00 19,750.00 19,750.00 144,000.00 68,800.00 68,800.00 84, 825.00 108, 983.33 108, 983.33 54,500.00 41,833.33 41;833.33 46,885.00 55,766.67 55,766.67 49,850.00 47,833.33 47,833.33 120,000.00 134,957.00 134,957.00 22,500.00 23,083.33 23,083.33 2,500.00 2,500.00 2,500.00 5,000.00 5,000.00 5,000.00 25,965.00 6,633.33 6,633.33 10, 745.00 16, 866.67 16, 866.67 951,815.00 $737,907.00 90,422.43 $70,101.17 1,042,237.43 808,008.17 SANFORD R. LEVY DAVID VON BECK* CHARLES P. MORTIMER* KATIE J. COMSTOCK BRYAN D. DORAN JUDY K. BROWN" •Washington/Oregon Bars • *Wash ington/California Bars LEVY - VON BECK & ASSOCIATES, P.S. ATTORNEYS AT LAW 600 University Street, Ste. 3300 Seattle, WA 98101 (206) 626-5444 r;ITY OF RENTON Fax: (206) 382-5527 JUL 0 2 2013 DOLORES EVANS, Office Manager TED LEVY REBECCA BOWERS ANDY GOLUB SAMANTHA SUON BRIAN MCONNELL RECEIVED CITY CLERK'S OFFICE CC : Cry-l�-oY(a WASHINGTON PUBLIC WORKS PRELIMINARY NOTICE I Our File No. 11.188809; BM Date of Mailing: June 28, 2013 City of Renton, Public Agency Name Equity Builders, LLC, General Contractor; Sent By Cert. Mail RE: Lind Ave Lift Station Replacement; 1891 Lind Ave SW; Renton, WA Customer: Advanced Power LLC From: Platt Electric Supply Customer Name: Advanced Power LLC This is to advise you that Platt Electric Supply will commence or has commenced to deliver electrical materials to Advanced Power LLC for use on the above -referenced project. Although Platt Electric Supply does not anticipate any problems in connection with this project, Washington statutes require that suppliers send this notice. PLEASE TAKE NOTICE that the General Contractor and its bond will be held for the payment of any unpaid material, services, supplies, or equipment furnished by Platt Electric Supply SO, PLEASE TAKE NOTICE that a lien against the retained percentage may be claimed for all unpaid terials and supplies, or equipment furnished. This notice is not meant to be a reflection on Advanced Power LLC or that a claim will become necessary. Rather, we are merely complying with the laws of the State of Washington. Please feel free to call us if you have any questions or concerns. Sender: Platt Electric Supply Address: 10605 SW Allen Boulevard; Beaverton, OR 97005 Telephone: (800) 257-5288 Very truly yours, LEVY - V BECK & ASSOCIATES, P.S. cc: Platt Electric Supply PUBLIC WORKS DEPARTMENT City of M E M O R A N D U M DATE: April 17, 2013 TO: Bonnie Walton, City Clerk FROM: John Hobson, Wastewater Utility Engineer, x7279 �P* SUBJECT: Bid Award for the Lind Avenue Lift Station Replacement Project The Public Works Department has reviewed the bids that were submitted for the Lind Avenue Lift Station Replacement project and we recommend that the bid be awarded to Equity Builders, LLC. We are requesting that an agenda bill for "Council Concur" be prepared for the April 29, 2013, Council Meeting. The bid opening was on Tuesday, April 16, 2013. There were nine bids received. There was one minor error.on Interwest Construction, Inc.'s bid (they were eighth highest of nine bids) that did not affect the order of bids. The low bidder is Equity Builders, LLC with a bid of $698,391.00. The engineer's estimate was $740,767.50. The project budget amount for the Lind Avenue Lift Station Replacement project (426.465481) is $800,000. The low bid for the Lind Avenue Lift Station Replacement project is within the amount approved in the 2013 budget for this project. The project will replace the existing Lind Avenue Lift Station with a new lift station that will also include an onsite backup generator to supply electricity during area power outages. The Lind Avenue Lift Station is located in an easement at the northwest corner of Lind Avenue South and South 191h Street. Attached for your reference, is the bid tabulation showing the engineer's estimate, the low bid, and the other bids submitted. If you have any questions, please contact me at 425-430-7279 or by email at jhobson@rentonwa.�ov. Attachments cc: Gregg Zimmerman, PW Administrator Lys Hornsby, Utility Systems Director Dave Christensen, Wastewater Utility Supervisor H:\File Sys\WWP - WasteWater\WWP-27-3626 Lind Ave Lift Station\Bid Documents\Award-Clerk-Lind Avenue Lift Station Replacement.doc/MHtp . RH2 ENGINEERING, INC. 22722 29"' Dr. SE. Suite 210 Bothell, WA 98021 E N A 1 N E 6 R 6 (425) 951-5400 or (800) 720-8052 r L A N N! R 6 a c i i N r 1 s r 6 Fax: (425) 398-2774 TO: City of Renton 5th Floor 1055 S Grady Way Renton, WA 98057 Sent via: US Mail WE ARE SENDING YOU THE FOLLOWING: Letter of Transmittal DATE: April 3, 2013 JOB NO.: REN 112.023.01.103 ATTENTION: Mr. John Hobson RE: Lind Lift Station X Attached Under Separate Cover Via: Shop Drawings Prints Plans Samples Specifications Copy of Letter Change Order Submittals COPIES DATE NO. DESCRIPTION 1 I Lind Lift Station Contract Documents Original Signature Page THESE ARE TRANSMITTED AS CHECKED BELOW: For approval Approved as submitted Resubmit copies for approval X For your use Approved as noted Submit copies for distribution X As requested Returned for corrections Return corrected prints For your information Signature For review and comment For bids due: Prints returned after loan to us REMARKS: RECEIVED APR 04 2013 CITY OF RENTON UTILITY SYSTEMS COPY TO: SIGNED: Mark Miller, P.E. 04 01 11 11 10 .4\1 1:0ata\REM 112-023\Trans to 1 Hobson re Orieinal Paee 04-03-2013.docx CITY OF RENTON RENTON, WASHINGTON CONTRACT DOCUMENTS forthe Lind Lift Station PROJECT NO. WWP-27-3626 January 2013 BIDDING REQUIREMENTS CONTRACT FORMS CONDITIONS OF THE CONTRACT SPECIFICATIONS PLANS 38613 1STk.X NAL .I I '//$/1v13 ti < TZ 16727 IfA \I ��SIpVAL� � Prepared by: PENGINEERS RH2 Engineering, Inc. 300 Simon Street SE Suite 5 ast Wenatchee, WA 98802 ER S (509) 886-2900 (p) (509) 886-2313 (f) SCIENTIS T S CITY OF RENTON BID TABULATION SHEET PROJECT: Lind Avenue Lift Station Replacement CAG-13-046 DATE: April 16, 2013 Page 1 of 2 FORMS Proposal & Bidder Triple L& I Bid Add. Bid Total from Schedule of Prices Forms Certificate Bond 1 *Includes Sales Tax Equity Builders, LLC 5066 E 26th Dr. Bellingham, WA 98226 Gary Harper Constructon, Inc. 14831 223rd St. SE �� Snohomish, WA 98296-3989 I&E Construction, Inc. 9550 SE Clackamas Rd. Clackamas, OR 97015 Interwest Construction, Inc. 609 North Hill Blvd. Burlington, WA 98233 / Johansen Excavating PO Box 674 Buckley, WA 98321 4 McClure & Sons, Inc. 15714 Country Club Drive �> Mill Creek, WA 98012 R.L. Alia Company 107 Williams Ave. S. L g 0Q Renton, WA 98057 "1 Road Construction Northwest, Inc. PO Box 188 _ •73 7620, —a— Renton, WA 98057-0188 ` 7 (over) CITY OF RENTON BID TABULATION SHEET PROJECT: Lind Avenue Lift Station Replacement CAG-13-046 DATE: April 16, 2013 Page 2of 2 FORMS Proposal & Bidder Triple L& I Bid Add. Bid Total from Schedule of Prices Forms Certificate Bond 1 *Includes Sales Tax Rodarte Construction, Inc. 17 E. Valley Hwy East Auburn, WA 98092 L eJ ,5c'G o 1 ENGINEER'S ESTIMATE: Triple Form: Non -Collusion; Anti -Trust Claims; Minimum Wage $740,767.50 'Denis taw"' mayor C oork v �s�ber�)a�ftmMZimmerman,,,,'Administrator 6ubii r 9 !F May A 1201 % Mr eorge,' H 6c h sfe i h `Equity 13—ild'" LL�'C�­ , u ie-rs q 5066,E':26­-"Dive :Bellingham; '.*�_*--- _'9822& g rn� 'h RE -'BID AWARIJ -.LlNb;AVtNu'E LIFT ; f, ff4t;PIROk STATION REPLACEM CT w Dear Mr-Ho6listein". 7 At I '0"Rot6m"City.260nd meeting in g 2.9;151'3�'�C&dh'ti -0 cep-feEquity Builders g. LLC% bid -of'$'698�39iI--*'00,:fd(fh'e Lihd,.AVen66-'Lift!Stati6ri,R60'lbcemc?nt-,prbjet.t.--,You ,�� -letter - rom the ',Cityl Clerk with -the ;6ffici�i I;b i'd �'dward, s,h6dld'. iY f OhTa'. Forexec-b"t"iono'fith' ormati0n-,as:§o,on,as,.-f e,contract- -p ease;suDmit. b 'we:can:pr! w Ta n -p o(urnebts�, (5r,revie "d p6ssible-�i-o" tie Mayor:, 7 of names, addresses,. mergency prior 6 f& RL 16 -Officer, ID :ispon ; - si bForeman, andd B nrd in g­,) _-J w ties authorized -Ad --sign -the. coritract',� the " �J`­contract ".. �nl�Walfbf Y hb'�6.':0.jf R oWn 2;, �0� entat!6 ofif �company"an,a..sam�-p..I'es'xo�-f,h fteirsignatures brl i 66hSe-)'`'. 3 ..6o ocopy ot your current St'a"fiii-Co"trk" bf6'(-sIicehs6 not -ma ste 4PhOtOCOpy Ofyour cu 00 p'tiG'ity:6fJR6' u s ihe License Y our-,current,usiness ` i tit at s . license expires oiJUlY3I,2013jo,r6ffbW,yCity Business contact` t': or,,visi out, re, n to nw,,,*J­g6v. A`,- Weldon I Lind d6h',bt;_4�5�430'-69�'i t"i , -5.T.JW,contract'signe _: on&:'ohT' iiy'6'fRenton tTOMS .16gaUNDATED _ TkdiIhbe,fiIIed,j'when signed bythe Mayor & Dng'.' Practices'Affid6-.Vit.`df'Compliance ,(6'biql6s6d) y.6, Renton 7,Tw,b signed contracts, j'ls&'Ukb'A,t(enclosed) b '*' 8 One :c6etficste-of*IhsirbicO"f6r.2013Jn accora- an ce Wit WSkti'br1'07,18:-6f-t h Spepial' rovisiahK' Please add.fhezty of -Renton as`addltio n-al'h'sur-d ei n's ,ur,ance;po i(�,'dLiclaratibhp a insurance policies obt0 i fi'- 6' d" , *,.- from,g th-j insuranceicarrier `, 9805� r e*n'tonwa; ov ebton'City Hall. 1055',Squth G(�'dy way Minton;Washington Mr. Hochstein Page 2 of 2 May 1, 2013 After the contract information is submitted, we will need the following information to review and approve before construction can start. 1. Provide material submittals as required for the work involved with this job. This will include, but not be limited to, information on the proposed source and specifications of all materials that will be used in the project (e.g.; mechanical, electrical, structures, pipe, imported aggregate materials, etc.), showing that the proposed material meets the project specifications, per Standard Specifications and Special Provisions Section 1-06.1. Provide any shop drawings and submittals needed for the project per Standard Specifications and Special Provisions Section 1-06. 2. Work Plan. Include the following items: 1. Proposed construction sequencing and schedule for the project 2. Mobilization Plan 3. Temporary Erosion and Sediment Control Plan 4. Traffic Control Plan for work in Lind Ave SW and SW 19'h St (enclosed) 5. Street Cleaning and Sweeping Plan 6. Trench Excavation Safety Systems Plan 7. Disposal Site 3. Construction Surveying. Identify the surveying firm/surveyor and a letter showing that the surveyor is licensed in the State of Washington. Please let me know when you would like to have the pre -construction conference. We will need to notify the private utilities and City Inspector, so there should be a lead-time of at least one week before the conference. Please contact me at 425-430-7279 or ihobson@rentonwa.gov, if you have any questions. Sincer ly, E 4n Hobson Wastewater Utility Enclosures H:\File Sys\WWP - WasteWater\WWP-27-3626 Lind Ave Lift Station\Award Info\Equity Builders Award Letter Lind Ave - Lift Station Replacement.doc\JDHtp Denis Law Cl of Mayor City Clerk -Bonnie I.Walton April 30, 2013 Equity Builders, LLC. George Hochstein 5066 E 26th Dr. Bellingham, WA 98226 RE: Lind Avenue Lift Station Replacement Project; CAG-13-046 Dear Mr. Hochstein: At its regular meeting of April 29, 2013 the Renton City Council accepted your bid for the above -referenced project in the amount of $698,391.00. Please contact John Hobson, Project Manager, for submission of required documents to complete the contract. These may include proof of City and State business licenses, performance bond, and insurance certificates. Sincerely, s A. t Deputy City Clerk cc: John Hobson, Project Manager Linda Weldon, Accounting Assistant Tracy Schuld, Accounting Supervisor 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov 1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov Denis Law 'City. Of y Ma or � J ri City Clerk - Borinie I.Walton April 30, 2013 Richard L. Alia R.L. Alia Company 107 Williams Ave. S. Renton, WA 98057 RE: Lind Avenue Lift Station Replacement: CAG-13-046 Dear Mr. Alia: At its regular meeting on April 29, 2013 the Renton City Council accepted.the low bid submitted by Equity Builders, LLC. ,for the above -referenced project in the amount of $698,391.00. Thank you for your interest and your bid. Sincerely, Jason A. eth Deputy City Clerk cc: John Hobson, Project Manager 1055 South Grady Way • Renton, Washington 98057 (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov nis Della oaW 1 City Of. Y a City Clerk. -.Bonni,e. 1. Walton April 30, 2013 Eben Twaddle Interwest Construction, Inc. _ 609 North Hill Blvd Burlington; WA 98233 RE: Lind Avenue Lift Station Replacement:.CAG-13-046 Dear Mr. Twaddle: At its regular meeting on. April 29, 2013 the Renton City Council accepted.the low bid submitted by Equity Builders, .LLC. for the above -referenced project in the amount of $698,391.00. Thank you for your interest and your bid.. Since ely, Jaso A. eth Deputy City Clerk cc: John Hobson, Project Manager, 1055 South Grady Way • Renton, Washington 98057 (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov Denis Law Cl ty of Mayor City Clerk - Bonnie I. Walton April 30, 2013. J.R. Rodarte Rodarte Construction, Inc. 17 E. Valley Hwy East Auburn,. WA 98092 RE: Lind Avenue Lift Station Replacement: CAG-13-046 - o Dear Mr. Rodarte: At its regular meeting on April 29, 2013 the Renton City_Council accepted the low bid submitted by Equity Builders, LLC. for the above -referenced project in the amount.of $698,391.00. Thank you for your interest and your bid. Sincerely, Jas n A. eth Deputy City Clerk cc: John Hobson, Project Manager 1055 South Grady Way, Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516.• rentonwa.gov