HomeMy WebLinkAboutWWP273626 (5)Project : Lind Avenue Lift Station Replacement
BID DATE: April 16, 2013
Item
No.
Desc
Unit Est.
Quant
1
Mobilization & Demobilization
Lump Sum
1
2
Site Work and Utilities
Lump Sum
1
3
Traffic Control
Lump Sum
1
4
Trench Safety and Shoring
Lump Sum
1
5
Dewatering
Lump Sum
1
6
Lift Station.Structural
Lump Sum
1
7
Electrical Building Structural
Lump Sum
1
8
Lift Station Pumps and Motors
Lump Sum
1
9
Mechanical
Lump Sum
1
10
Electrical
Lump Sum
1
11
Lift Station Finishes
Lump Sum
1
12
Operation and Maintenance Manuals and On -Site Owner Training
Lump Sum
1
13
Construction Records
Lump Sum
1
14
Abandonment of Existing Lift Station
Lump Sum
1
15
Pedestrian Crossing System
Lump Sum
1
City of Renton
Engineers Estimate
Unit Bid
Price Amount
, Equity; Builder,"s LLCM-'
lUrilt - r `06
iP,rlce _',, 5� :fA"m0urA:_,;."„
McClure and Sons, Inc.
Unit Bid
Price Amount
31,000:00
31,000.00
, ~ 401000400� "640Y000700
36,000.00
36,000.00
99,000.00
99,000.00
' 1(6,1,V000.00�
�1�6p��000 00
75,000.00
75,000.00
10,000.00
10,000.00
'1i0 OOOY001
�oO�OOOY00
15,000.00
15,000.00
15,000.00
15,000.00
�t13�000?;00;+
�,�. XJ,060Y00
25,000.00
25,000.00
29,000.00
29,000.00
(66000fOQ,
" (oOOOYOQ
50,000.00
50,000.00
169,000.00
169,000.00
"' ;(84;Q00'-00
"°.:rM4P00'0
125,000:00
125,000.00
25,000.00
25,000.00
241060f00
j24rf000�00
50,000.00
50,000.00
46,000.00
46,000.00
(45 000YQOi
�4510OO;�QO
60,000.00
60,000.00
48,000.00
48'000.00
120ti00011001
20�000?00
70,000.00
70,000.00
147,000.00
147,000.00
5161184000yao
151r8i000GOp
100,942.00
100,942.00
17,000.00
17,000.00
`' f271OQ0�001
f27x00QfOQ
40,000.00
40,000.00
2,500.00
2,500.00
;12$OOX001
f2x500`00
2,500.00
2,500.00
5,000.00
5,000.00
0'0�
=` �5f00,0OQ
5,000.00
5,000.00
10,000.00
10,000.00
�' t8�000 OQ
VOW00
1,000.00
1,000.00
23,000.00
23,000.00
14�300�001
il`4 300ti00
10,000.00
10,000.00
Subtotal
676,500.00
(637
665442.00
Tax 9.5%
64,267.50
? (60;5911f00
63,216.99
Total
740,767.50
98?3941 0
728,658.99
Project : Lind Avenue Lift Station Replacement
BID DATE: April 16, 2013
Item
Unit Est.
No.
Description
1
Mobilization,& Demobilization
Lump Sum
2
Site Work and Utilities
Lump Sum
3
Traffic Control
Lump Sum
4
Trench Safety and Shoring
Lump Sum
5
Dewatering
Lump Sum
6
Lift Station Structural
Lump Sum
7
Electrical Building Structural
Lump Sum
8
Lift Station Pumps and Motors
Lump Sum
9
Mechanical
Lump Sum
10
Electrical
Lump Sum
11
Lift Station Finishes
Lump Sum
12
Operation and Maintenance Manuals and On -Site Owner Training
Lump Sum
13
Construction Records
Lump Sum
14
Abandonment of Existing Lift Station
Lump Sum
15
Pedestrian Crossing System
Lump Sum
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Harper Construction, Inc.
Unit
Bid
Price
Amount
31,400.00
31,400.00
142,300.00
142,300.00
15,900.00
15,900.00
13,500.00
13,500.00
71,800.00
71,800.00
97,900.00
97,900.00
40,000.00
40,000.00
49,600.00
49,600.00
47,000.00
47,000.00
128, 800.00
128, 800.00
30,500.00
30,500.00
2,500.00
2,500.00
5,000.00
5,000.00
9,800.00
9,800.00
21,400.00
21,400.00
707,400.00
67,203.00
774,603.00
R. L. Alia
Unit Bid
Price Amount
20,000.00
20,000.00
230,000.00
230,000.00
3,500.00
3,500.00
1,000.00
1,000.00
60,000.00
60,000.00
75,000.00
75,000.00
25,000.00
25,000.00
50,000.00
50,000.00
75,000.00
75,000.00
115, 000.00
.
115,000.00
20,000.00
20,000.00
2,500.00
2,500.00
5,000.00
5,000.00
5,000.00
5,000.00
25,000.00 25,000.00
712,000.00
67,640.00
779, 640.00
ROAD CONSTRUCTION
Unit
Bid
Price
Amount
64;900.00
64,900.00
117, 000.00
117, 000.00
20,000.00
20,000.00
16,000.00
16,000.00
115, 000.00
115, 000.00
132, 000.00
132, 000.00
47,000.00
47,000.00
55,000.00
55,000.00
30,000.00
30,000.00
154,000.00
154,000.00
18,000.00
18,000.00
2,500.00
2,500.00
5,000.00
5,000.00
6,000.00
6,000.00
15,500.00
15,500.00
797,900.00
75, 800.50
873,700.50
Project : Lind Avenue Lift Station Replacement
BID DATE: April 16, 2013
Item
No. Description
Unit
Est.
Quani
1
Mobilization & Demobilization
Lump Sum
1
2
Site Work and Utilities
Lump Sum
1
3
Traffic Control
Lump Sum
1
4
Trench Safety and Shoring
Lump Sum
1
5
Dewatering
Lump Sum
1
6
Lift Station Structural
Lump Sum
1
7
Electrical Building Structural
Lump Sum
1
8
Lift Station Pumps and Motors
Lump Sum
1
9
Mechanical
Lump Sum
1
10
Electrical
Lump Sum
1
11
Lift Station Finishes
Lump Sum
1
12
Operation and Maintenance Manuals and On -Site Owner Training
Lump Sum
1
13
Construction Records
Lump Sum
1
14
Abandonment of Existing Lift Station
Lump Sum
1
15
Pedestrian Crossing System
Lump Sum
1
rwest Construction, Inc. I & E Construction, Inc. Rodarte Construction Inc.
Unit
Price
Bid
Amount
Unit
Price
Bid
Amount
Unit
Price
Bid
Amount
68,400.00
68,400.00
67,000.00
- 67,000.00
63,000.00
63,000.00
170,000.00
170,000.00
202,944.00
202,944.00
155,000.00
155,000.00
15,000.00
15,000.00
11,000.00
11,000.00
9,000.00
9,000.00
50,000.00
50,000:00
21,582.00
21,582.00
125,000.00
125,000.00
50,000.00
50,000.00
78,381.00
78,381.00
165,000.00
165,000.00
140,000.00
140,000.00
82,749.00
82,749.00
85,000.00
85,000.00
65,000.00
65,000.00
66,992.00
66,992.00
45,000.00
45,000.00
75,000.00
75,000.00
52,232.00
52,232.00
50,000.00
50,000.00
45,000.00
45,000.00
45,160.00
45,160.00
30,000.00
30,000.00
193, 000.00
193, 000.00
112, 950.00
112, 950.00
120, 000.00
120, 000.00
3,000.00
3,000.00
29,943.00
29,943.00
23,000.00
23,000.00
2,500.00
2,500.00
2,500.00
2,500.00
2,500.00
2,500.00
5,000.00
5,000.00
5,000.00
•5,000.00
5,000.00
5,000.00
10,000.00
10,000.00
7,688.00
7,688.00
6,500.00
6,500.00
15,000.00
15,000.00
30,022.00
30,022.00
16,000.00
16,000.00
906,900.00
816,143.00
900,000.00
86,155.50
77,533.59
85,500.00
993,055.50
893,676.59
985,500.00
Project : Lind Avenue Lift Station Replacement
BID DATE: April 16, 2013
Item Unit
No.. Description
1 ivioomzauon a vernuuwzauun
�Ul l lv . Ul ll
2 Site Work and Utilities
Lump Sum
3 Traffic Control
Lump Sum
4 Trench Safety and Shoring
Lump Sum
5 Dewatering
Lump Sum
6 Lift Station Structural
Lump Sum
7 Electrical Building Structural
Lump Sum
8 Lift Station Pumps and Motors
Lump Sum
9 Mechanical
Lump Sum
10 Electrical
Lump Sum
11 Lift Station Finishes
Lump Sum
12 Operation and Maintenance Manuals and On -Site Owner Training
Lump Sum
13 Construction Records
Lump Sum
14 Abandonment of Existing Lift Station
Lump Sum
15 Pedestrian Crossing System
Lump Sum
Johansen Excavating, Inc
Est. Unit
janifty Price
1
1
1
1
1
1
1
1
1
1
1
1
1
1
87,150.00
120,120.00
46,425.00
131,350.00
144,000.00
84,825.00
54,500.00
46,885.00
49,850.00
120,000.00
22,500.00
2,500.00
5,000.00
25,965.00
10,745.00
Average Bid
Bid
Unit
Bid
Amount
Price
Amount
87,150.00
43,450.00
43,450.00
120,120.00
149,216.67
149,216.67
46, 425.00
13, 233.33
13, 233.33
131,350.00
19,750.00
19,750.00
144,000.00
68,800.00
68,800.00
84, 825.00
108, 983.33
108, 983.33
54,500.00
41,833.33
41;833.33
46,885.00
55,766.67
55,766.67
49,850.00
47,833.33
47,833.33
120,000.00
134,957.00
134,957.00
22,500.00
23,083.33
23,083.33
2,500.00
2,500.00
2,500.00
5,000.00
5,000.00
5,000.00
25,965.00
6,633.33
6,633.33
10, 745.00
16, 866.67
16, 866.67
951,815.00
$737,907.00
90,422.43
$70,101.17
1,042,237.43
808,008.17
SANFORD R. LEVY
DAVID VON BECK*
CHARLES P. MORTIMER*
KATIE J. COMSTOCK
BRYAN D. DORAN
JUDY K. BROWN"
•Washington/Oregon Bars
• *Wash ington/California Bars
LEVY - VON BECK & ASSOCIATES, P.S.
ATTORNEYS AT LAW
600 University Street, Ste. 3300
Seattle, WA 98101
(206) 626-5444 r;ITY OF RENTON
Fax: (206) 382-5527
JUL 0 2 2013
DOLORES EVANS, Office Manager
TED LEVY
REBECCA BOWERS
ANDY GOLUB
SAMANTHA SUON
BRIAN MCONNELL
RECEIVED
CITY CLERK'S OFFICE
CC : Cry-l�-oY(a
WASHINGTON PUBLIC WORKS PRELIMINARY NOTICE I
Our File No. 11.188809; BM
Date of Mailing: June 28, 2013
City of Renton, Public Agency Name
Equity Builders, LLC, General Contractor; Sent By Cert. Mail
RE: Lind Ave Lift Station Replacement; 1891 Lind Ave SW; Renton, WA
Customer: Advanced Power LLC
From: Platt Electric Supply
Customer Name: Advanced Power LLC
This is to advise you that Platt Electric Supply will commence or has commenced to deliver electrical materials
to Advanced Power LLC for use on the above -referenced project.
Although Platt Electric Supply does not anticipate any problems in connection with this project, Washington
statutes require that suppliers send this notice. PLEASE TAKE NOTICE that the General Contractor and its
bond will be held for the payment of any unpaid material, services, supplies, or equipment furnished by Platt
Electric Supply
SO, PLEASE TAKE NOTICE that a lien against the retained percentage may be claimed for all unpaid
terials and supplies, or equipment furnished. This notice is not meant to be a reflection on Advanced Power
LLC or that a claim will become necessary. Rather, we are merely complying with the laws of the State of
Washington.
Please feel free to call us if you have any questions or concerns.
Sender: Platt Electric Supply
Address: 10605 SW Allen Boulevard; Beaverton, OR 97005
Telephone: (800) 257-5288
Very truly yours,
LEVY - V BECK & ASSOCIATES, P.S.
cc: Platt Electric Supply
PUBLIC WORKS DEPARTMENT City of
M E M O R A N D U M
DATE: April 17, 2013
TO: Bonnie Walton, City Clerk FROM: John Hobson, Wastewater Utility Engineer, x7279 �P*
SUBJECT: Bid Award for the Lind Avenue Lift Station Replacement
Project
The Public Works Department has reviewed the bids that were submitted for the Lind
Avenue Lift Station Replacement project and we recommend that the bid be awarded to
Equity Builders, LLC. We are requesting that an agenda bill for "Council Concur" be
prepared for the April 29, 2013, Council Meeting.
The bid opening was on Tuesday, April 16, 2013. There were nine bids received. There
was one minor error.on Interwest Construction, Inc.'s bid (they were eighth highest of
nine bids) that did not affect the order of bids.
The low bidder is Equity Builders, LLC with a bid of $698,391.00. The engineer's
estimate was $740,767.50.
The project budget amount for the Lind Avenue Lift Station Replacement project
(426.465481) is $800,000. The low bid for the Lind Avenue Lift Station Replacement
project is within the amount approved in the 2013 budget for this project.
The project will replace the existing Lind Avenue Lift Station with a new lift station that
will also include an onsite backup generator to supply electricity during area power
outages. The Lind Avenue Lift Station is located in an easement at the northwest corner
of Lind Avenue South and South 191h Street.
Attached for your reference, is the bid tabulation showing the engineer's estimate, the
low bid, and the other bids submitted.
If you have any questions, please contact me at 425-430-7279 or by email at
jhobson@rentonwa.�ov.
Attachments
cc: Gregg Zimmerman, PW Administrator
Lys Hornsby, Utility Systems Director
Dave Christensen, Wastewater Utility Supervisor
H:\File Sys\WWP - WasteWater\WWP-27-3626 Lind Ave Lift Station\Bid Documents\Award-Clerk-Lind Avenue Lift
Station Replacement.doc/MHtp
. RH2 ENGINEERING, INC.
22722 29"' Dr. SE. Suite 210
Bothell, WA 98021
E N A 1 N E 6 R 6 (425) 951-5400 or (800) 720-8052
r L A N N! R 6
a c i i N r 1 s r 6 Fax: (425) 398-2774
TO: City of Renton
5th Floor
1055 S Grady Way
Renton, WA 98057
Sent via: US Mail
WE ARE SENDING YOU THE FOLLOWING:
Letter of Transmittal
DATE: April 3, 2013 JOB NO.: REN
112.023.01.103
ATTENTION: Mr. John Hobson
RE: Lind Lift Station
X
Attached
Under Separate Cover Via:
Shop Drawings
Prints
Plans
Samples
Specifications
Copy of Letter
Change Order
Submittals
COPIES DATE NO. DESCRIPTION
1 I Lind Lift Station Contract Documents Original Signature Page
THESE ARE TRANSMITTED AS CHECKED BELOW:
For approval
Approved as submitted
Resubmit copies for approval
X
For your use
Approved as noted
Submit copies for distribution
X
As requested
Returned for corrections
Return corrected prints
For your information
Signature
For review and comment
For bids due: Prints returned after loan to us
REMARKS:
RECEIVED
APR 04 2013
CITY OF RENTON
UTILITY SYSTEMS
COPY TO: SIGNED: Mark Miller, P.E.
04 01 11 11 10 .4\1 1:0ata\REM 112-023\Trans to 1 Hobson re Orieinal Paee 04-03-2013.docx
CITY OF RENTON
RENTON, WASHINGTON
CONTRACT DOCUMENTS
forthe
Lind Lift Station
PROJECT NO.
WWP-27-3626
January 2013
BIDDING REQUIREMENTS
CONTRACT FORMS
CONDITIONS OF THE CONTRACT
SPECIFICATIONS
PLANS
38613
1STk.X
NAL .I I '//$/1v13
ti <
TZ 16727
IfA \I ��SIpVAL� �
Prepared by:
PENGINEERS
RH2 Engineering, Inc.
300 Simon Street SE Suite 5
ast Wenatchee, WA 98802
ER S (509) 886-2900 (p) (509) 886-2313 (f)
SCIENTIS T S
CITY OF RENTON
BID TABULATION SHEET
PROJECT: Lind Avenue Lift Station Replacement
CAG-13-046
DATE: April 16, 2013
Page 1 of 2
FORMS
Proposal &
Bidder
Triple
L& I
Bid
Add.
Bid Total from Schedule of Prices
Forms
Certificate
Bond
1
*Includes Sales Tax
Equity Builders, LLC
5066 E 26th Dr.
Bellingham, WA 98226
Gary Harper Constructon, Inc.
14831 223rd St. SE
��
Snohomish, WA 98296-3989
I&E Construction, Inc.
9550 SE Clackamas Rd.
Clackamas, OR 97015
Interwest Construction, Inc.
609 North Hill Blvd.
Burlington, WA 98233
/
Johansen Excavating
PO Box 674
Buckley, WA 98321
4
McClure & Sons, Inc.
15714 Country Club Drive
�>
Mill Creek, WA 98012
R.L. Alia Company
107 Williams Ave. S.
L
g 0Q
Renton, WA 98057
"1
Road Construction Northwest, Inc.
PO Box 188
_
•73 7620, —a—
Renton, WA 98057-0188
`
7
(over)
CITY OF RENTON
BID TABULATION SHEET
PROJECT: Lind Avenue Lift Station Replacement
CAG-13-046
DATE: April 16, 2013
Page 2of 2
FORMS
Proposal &
Bidder
Triple
L& I
Bid
Add.
Bid Total from Schedule of Prices
Forms
Certificate
Bond
1
*Includes Sales Tax
Rodarte Construction, Inc.
17 E. Valley Hwy East
Auburn, WA 98092
L
eJ ,5c'G o
1
ENGINEER'S ESTIMATE:
Triple Form: Non -Collusion; Anti -Trust Claims; Minimum Wage
$740,767.50
'Denis taw"'
mayor
C oork v �s�ber�)a�ftmMZimmerman,,,,'Administrator
6ubii r
9
!F
May A 1201
%
Mr
eorge,' H 6c h sfe i h
`Equity 13—ild'" LL�'C�
, u ie-rs q
5066,E':26-"Dive
:Bellingham; '.*�_*---
_'9822&
g rn� 'h
RE -'BID AWARIJ -.LlNb;AVtNu'E LIFT ; f, ff4t;PIROk STATION REPLACEM CT
w
Dear Mr-Ho6listein". 7
At I '0"Rot6m"City.260nd meeting in g 2.9;151'3�'�C&dh'ti -0 cep-feEquity Builders g.
LLC% bid -of'$'698�39iI--*'00,:fd(fh'e Lihd,.AVen66-'Lift!Stati6ri,R60'lbcemc?nt-,prbjet.t.--,You
,��
-letter - rom the ',Cityl Clerk with -the ;6ffici�i I;b i'd �'dward,
s,h6dld'.
iY f OhTa'.
Forexec-b"t"iono'fith' ormati0n-,as:§o,on,as,.-f
e,contract- -p ease;suDmit.
b
'we:can:pr! w Ta n
-p o(urnebts�, (5r,revie "d
p6ssible-�i-o" tie
Mayor:,
7
of names, addresses,.
mergency prior 6 f&
RL 16 -Officer, ID
:ispon ; - si bForeman, andd B nrd in g,)
_-J w
ties authorized -Ad --sign -the. coritract',� the
" �J`contract ".. �nl�Walfbf
Y hb'�6.':0.jf
R
oWn 2;, �0� entat!6 ofif
�company"an,a..sam�-p..I'es'xo�-f,h fteirsignatures
brl i 66hSe-)'`'.
3 ..6o ocopy ot your current St'a"fiii-Co"trk" bf6'(-sIicehs6 not -ma ste
4PhOtOCOpy Ofyour cu 00 p'tiG'ity:6fJR6' u s ihe License Y
our-,current,usiness `
i tit at s .
license expires oiJUlY3I,2013jo,r6ffbW,yCity Business contact` t':
or,,visi out, re, n to nw,,,*Jg6v.
A`,- Weldon I Lind d6h',bt;_4�5�430'-69�'i t"i
,
-5.T.JW,contract'signe _: on&:'ohT' iiy'6'fRenton tTOMS .16gaUNDATED
_
TkdiIhbe,fiIIed,j'when signed bythe Mayor & Dng'.' Practices'Affid6-.Vit.`df'Compliance ,(6'biql6s6d)
y.6, Renton
7,Tw,b signed contracts, j'ls&'Ukb'A,t(enclosed) b '*'
8 One :c6etficste-of*IhsirbicO"f6r.2013Jn accora-
an ce Wit WSkti'br1'07,18:-6f-t h
Spepial' rovisiahK' Please add.fhezty of -Renton as`addltio
n-al'h'sur-d
ei n's ,ur,ance;po i(�,'dLiclaratibhp a insurance policies obt0 i fi'- 6' d"
,
*,.-
from,g th-j insuranceicarrier
`, 9805� r e*n'tonwa; ov
ebton'City Hall. 1055',Squth G(�'dy way Minton;Washington
Mr. Hochstein
Page 2 of 2
May 1, 2013
After the contract information is submitted, we will need the following information to
review and approve before construction can start.
1. Provide material submittals as required for the work involved with this job. This will
include, but not be limited to, information on the proposed source and
specifications of all materials that will be used in the project (e.g.; mechanical,
electrical, structures, pipe, imported aggregate materials, etc.), showing that the
proposed material meets the project specifications, per Standard Specifications and
Special Provisions Section 1-06.1. Provide any shop drawings and submittals needed
for the project per Standard Specifications and Special Provisions Section 1-06.
2. Work Plan. Include the following items:
1. Proposed construction sequencing and schedule for the project
2. Mobilization Plan
3. Temporary Erosion and Sediment Control Plan
4. Traffic Control Plan for work in Lind Ave SW and SW 19'h St (enclosed)
5. Street Cleaning and Sweeping Plan
6. Trench Excavation Safety Systems Plan
7. Disposal Site
3. Construction Surveying. Identify the surveying firm/surveyor and a letter showing
that the surveyor is licensed in the State of Washington.
Please let me know when you would like to have the pre -construction conference. We
will need to notify the private utilities and City Inspector, so there should be a lead-time
of at least one week before the conference.
Please contact me at 425-430-7279 or ihobson@rentonwa.gov, if you have any
questions.
Sincer ly,
E
4n Hobson
Wastewater Utility
Enclosures
H:\File Sys\WWP - WasteWater\WWP-27-3626 Lind Ave Lift Station\Award Info\Equity Builders Award Letter Lind Ave -
Lift Station Replacement.doc\JDHtp
Denis Law
Cl of
Mayor
City Clerk -Bonnie I.Walton
April 30, 2013
Equity Builders, LLC.
George Hochstein
5066 E 26th Dr.
Bellingham, WA 98226
RE: Lind Avenue Lift Station Replacement Project; CAG-13-046
Dear Mr. Hochstein:
At its regular meeting of April 29, 2013 the Renton City Council accepted your bid for the
above -referenced project in the amount of $698,391.00.
Please contact John Hobson, Project Manager, for submission of required documents to
complete the contract. These may include proof of City and State business licenses,
performance bond, and insurance certificates.
Sincerely,
s A. t
Deputy City Clerk
cc: John Hobson, Project Manager
Linda Weldon, Accounting Assistant
Tracy Schuld, Accounting Supervisor
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
Denis Law 'City. Of
y
Ma or � J
ri
City Clerk - Borinie I.Walton
April 30, 2013
Richard L. Alia
R.L. Alia Company
107 Williams Ave. S.
Renton, WA 98057
RE: Lind Avenue Lift Station Replacement: CAG-13-046
Dear Mr. Alia:
At its regular meeting on April 29, 2013 the Renton City Council accepted.the low bid
submitted by Equity Builders, LLC. ,for the above -referenced project in the amount of
$698,391.00.
Thank you for your interest and your bid.
Sincerely,
Jason A. eth
Deputy City Clerk
cc: John Hobson, Project Manager
1055 South Grady Way • Renton, Washington 98057 (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
nis
Della oaW 1 City Of.
Y a
City Clerk. -.Bonni,e. 1. Walton
April 30, 2013
Eben Twaddle
Interwest Construction, Inc. _
609 North Hill Blvd
Burlington; WA 98233
RE: Lind Avenue Lift Station Replacement:.CAG-13-046
Dear Mr. Twaddle:
At its regular meeting on. April 29, 2013 the Renton City Council accepted.the low bid
submitted by Equity Builders, .LLC. for the above -referenced project in the amount of
$698,391.00.
Thank you for your interest and your bid..
Since ely,
Jaso A. eth
Deputy City Clerk
cc: John Hobson, Project Manager,
1055 South Grady Way • Renton, Washington 98057 (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
Denis Law Cl ty
of
Mayor
City Clerk - Bonnie I. Walton
April 30, 2013.
J.R. Rodarte
Rodarte Construction, Inc.
17 E. Valley Hwy East
Auburn,. WA 98092
RE: Lind Avenue Lift Station Replacement: CAG-13-046
- o
Dear Mr. Rodarte:
At its regular meeting on April 29, 2013 the Renton City_Council accepted the low bid
submitted by Equity Builders, LLC. for the above -referenced project in the amount.of
$698,391.00.
Thank you for your interest and your bid.
Sincerely,
Jas n A. eth
Deputy City Clerk
cc: John Hobson, Project Manager
1055 South Grady Way, Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516.• rentonwa.gov