HomeMy WebLinkAboutWWP273627 (3)GARY HARPER CONSTRUCTION INC.
TO
14831 223rd Street SE
Snohomish, Washington 98296-3989
(360)863-1955 Fax: (360) 863-1966
WE ARE SENDING YOU ',;f Attached 1 Under separate cover via
> 1 Shop drawings 1 Prints 1 Plans
1 Copy of letter 1 Change color 1
INUVAK ors VaQa1zMMoVVad
DATE )�
JOB NO.,vZ� ',;z
ATTENTION
RE:
�Q
the following items:
"] Samples 1 Specifications
COPIES
DATE
NO.
DESCRIPTION
1-7115
c
ao dab
e,1017 /-c;n - s
i///�-
1),4�&
-
// h,,z / 3
GLT ' �'; ✓ /' D /Cr!
THESE ARE TRANSMITTED as checked below:
-79< For approval 1 Approved as submitted O Resubmit copies for approval
1 For your use 1 Approved as noted O Submit _ copies for distribution
O As requested 1 Returned for corrections O Return corrected prints
O For review and comment 1
O FORBIDS DUE 20 1 PRINTS RETURNED AFTER LOAN TO US
REMARKS -- - - - -
COPY TO
SIGNED
If enclosures are not as noted, kindly notify us at once.
Denis Law City of,',� r�
a ro
November 5, 2013
Gary Harper
Gary Harper Construction, Inc.
14831 223rd St SE
Snohomish, WA 98296-3989
RE: Misty Cove Lift Station Replacement Project; CAG-13-178
Dear Mr. Harper:
City Clerk -Bonnie I. Walton
RECEIVED
NOV 0 6 2013
CITY OF RENTON
UTILITY SYSTEMS
At its regular meeting of November 4, 2013 the Renton City Council accepted your bid for the
above -referenced project in the amount of $820,877.70.
Please contact John Hobson, Civil Engineer at 425-430-7279, for submission of required
documents to complete the contract. These may include proof of City and State business
licenses, performance bond, and insurance certificates.
Sincerely,
ason A. Seth
f
eputy City Clerk
cc: John Hobson, Project Manager
Linda Weldon, Accounting Assistant
Tracy Schuld, Accounting Supervisor
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
Denis Law P
ty Of .
Mayor. — `� Y �J
,
�
City Clerk - Bonnie I. Walton
November S, 2013
Les McClure
McClure and Sons, Inc.
15714 Country Club Dr.
Mill Creek, WA 98012
RE: Misty Cove Lift Station Replacement Project; CAG-13-178
Dear Mr. McClure:
At its regular meeting on November 4, 2013 the Renton City Council accepted the low
bid submitted by Gary Harper Construction, Inc. for the above -referenced project in the
amount of $820,877.70.
Thank you for your interest and your bid.
Sincerely,
Jason A.Seth
Deputy City Clerk
cc: John Hobson, Project Manager
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
Denis Law "- City of;
Mayor __
City Clerk -Bonnie I.Walton
November 5, 2013
Richard Alia
R.L. Alia Company
107 Williams Av S
Renton, WA 98057
RE: Misty Cove Lift Station Replacement Project; CAG-13-178
Dear Mr. Alia:
At its regular meeting on November 4, 2013 the Renton City Council accepted the low
bid submitted by Gary Harper Construction, Inc. for the above -referenced project in the
amount of $820,877.70.
Thank you for your interest and your bid.
Sin rely,
Jason A. Seth
Deputy City Clerk
cc: John Hobson, Project Manager
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
Denis
Me Mayor
--- City of
r
N
City Clerk -Bonnie I. Walton
November S, 2013
Donna Motland
Ceccanti
4116 Brookdale Rd. E.
Tacoma, WA 98446
RE: Misty Cove Lift Station Replacement Project; CAG-13-178
Dear Ms. Motland:
At its regular meeting on November 4, 2013 the Renton City Council accepted the low
bid submitted by Gary Harper Construction, Inc. for the above -referenced project in the
amount of $820,877.70.
Thank you for your interest and your bid.
Sinc ely,
/1
ason A. Seth
Deputy City Clerk
cc: John Hobson, Project Manager
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
Denis Law - - — City of.,
Mayor
City Clerk -Bonnie LWalton
November 5, 2013
Nick Coluccio
Frank Coluccio Construction Co.
9600 Martin Luther King JR. Way S.
Seattle, WA 98118
RE: Misty Cove Lift Station Replacement Project; CAG-13-178
Dear Mr. Coluccio:
At its regular meeting on November 4, 2013 the Renton City Council accepted the low
bid submitted by Gary Harper Construction, Inc. for the above -referenced project in the
amount of $820,877.70.
Thank you for your interest and your bid.
Sincerely,
�i
V
ason A.
Deputy City Clerk
cc: John Hobson, Project Manager
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
Denis Law - �y Ci Of"i tl
Mayor - # a Jam.
City Clerk -Bonnie I. Walton
November 5, 2013
Grant Jansen
Jansen, Inc.
2110 Buchanan Loop, Ste. 1
Ferndale, WA 98248
RE: Misty Cove Lift Station Replacement Project; CAG-13-178
Dear Mr. Jansen:
At its regular meeting on November 4, 2013 the Renton City Council accepted the low
bid submitted by Gary Harper Construction, Inc. for the above -referenced project in the
amount of $820,877.70.
Thank you for your interest and your bid.
Sincerely,
as A. eth
Deputy City Clerk
cc: John Hobson, Project Manager
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
Denis Law
Mayor City of,-
Ma�y r
Y C,
City Clerk -Bonnie I.Walton
November 5, 2013
Peter J. Kenney
Road Construction Northwest, Inc.
PO Box 188
Renton, WA 98057-0188
RE: Misty Cove Lift Station Replacement Project; CAG-13-178
Dear Mr. Kenney:
At its regular meeting on November 4, 2013 the Renton City Council accepted the low
bid submitted by Gary Harper Construction, Inc. for the above -referenced project in the
amount of $820,877.70.
Thank you for your interest and your bid.
Sin erely,
as A. Seth
Deputy City Clerk
cc: John Hobson, Project Manager
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
Den YoLaw City of,
•
City Clerk -Bonnie I. Walton
November S, 2013
J.R. Rodarte
Rodarte Construction, Inc.
17 E. Valley Hwy E.
Auburn, WA 98092
RE: Misty Cove Lift Station Replacement Project; CAG-13-178
Dear Mr. Rodarte:
At its regular meeting on November 4, 2013 the Renton City Council accepted the low
bid submitted by Gary Harper Construction, Inc. for the above -referenced project in the
amount of $820,877.70.
Thank you for your interest and your bid.
Sincerely,
as n A. SLeth
Deputy City Clerk
cc: John Hobson, Project Manager
1055 South Grady Way • Renton, Washington 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
CITY OF RENTON
BID TABULATION SHEET
PROJECT: Misty Cove Lift Station Replacement
CAG-13-178
DATE: October 22, 2013
Page 2 of 2
Bidder
FORMS
Bid Total from Schedule of Prices
*Includes Sales Tax
Proposal &
Combined
Trip. Form
L&I
Cert
Bid
Bond
Rodarte Construction, Inc.
17 E. Valley Hwy East�—
Auburn, WA 9809-11
Engineer's Estimate
$729,599.00
CITY OF RENTON
BID TABULATION SHEET
PROJECT: Misty Cove Lift Station Replacement
CAG-13-178
DATE: October 22, 2013
Page 1 of 2
FORMS
Proposal &
Bidder
Combined
L&I
Bid
Bid Total from Schedule of Prices
Trip. Form
Cert
Bond
*Includes Sales Tax
Ceccanti
4116 Brookdale Rd. E.
Tacoma, WA 98446
(�
c/ 4—Z vc,
Frank Coluccio Construciton Co.
9600 Martin Luther King Jr. Way S.
✓
Seattle, WA 98118
c,
Gary Harper Construction, Inc.
14831 223rd St. Se
r/
✓
✓
7G
Snohomish, WA 98296-3989
Jansen, Inc.
2110 Buchanan Loop, Ste. 1
✓
✓
f
G 43CZ .Z q
Ferndale, WA 98248
McClure and Sons, Inc.
Qt
15714 Country Club Dr.
✓
L%
L/
/ /�S`a /, �D
Mill Creek, WA 98012
R.L. Alia Company
107 Williams Ave. S.
c/
✓
✓
�% 9� �� ��
I
Renton, WA 98057
Road Construction Northwest, Inc.
PO Box 188
i/
L"-,
✓
�! �f //,¢./� �p
Renton, WA 98057-0188
(over)
Denis Law
Mayor
November 5, 2013
City of
� i USa�Gl+
Public Works Department - Gregg Zimmerman, P. E., Administrator
Mr. Gary Harper
Gary Harper Construction, Inc.
14831 223rd Street SE
Snohomish, WA 98296-3989
RE: Bid Award - Mist Cove Lift Station Replacement Project
Dear Mr. Harper:
At the Renton City Council meeting on November 4, 2013, Council accepted Gary Harper
Construction, Inc.'s bid of $820,877.70, for the Misty Cove Lift Station Replacement
project. You should be receiving a letter from the City Clerk with the official bid award.
For execution of the contract, please submit the following information as soon as
possible so we can prepare the contract documents for review and signature by the
Mayor:
1. A list of names, addresses, phone numbers, and emergency phone numbers for:
Responsible Officer, Job Foreman, and Bonding Agent.
2. Documentation of those parties authorized to sign the contract on behalf of the
company and samples of their signatures.
3. Photocopy of your current State Contractor's License (not master license).
4. Photocopy of your current City of Renton Business License or proof that you have
completed the application. As part of the application, you can request our License
Section to send me an in-house copy documenting your completed application. (To
obtain your City Business License, please contact Linda Weldon at 425-430-6851 or
visit our website at www.rentonwa.gov.)
5. Two signed contract bonds on City of Renton forms (enclosed), UNDATED.
The date will be filled in when signed by the Mayor.
6. One City of Renton Fair Practices Affidavit of Compliance (enclosed).
7. Two signed contracts, also UNDATED (enclosed).
8. One Certificate of Insurance for 2013 in accordance with Section 1-07.18 of the
Special Provisions. Please add the City of Renton and the Misty Cove Association of
Apartment Owners as additional insured.
Renton City Hall • 1055 South Grady Way • Renton, Washington 98057 • rentonwa.gov
Mr. Harper
Page 2 of 2
November S, 2013
9. The insurance policy declaration pages of all required insurance policies obtained
from the insurance carrier.
After the contract information is submitted, we will need the following information to
review and approve before construction can start.
1. Provide material submittals as required for the work involved with this job. This will
include, but not be limited to, information on the proposed source and
specifications of all materials that will be used in the project (e.g.; mechanical,
electrical, structures, pipe, imported aggregate materials, etc.), showing that the
proposed material meets the project specifications, per Standard Specifications and
Special Provisions Section 1-06.1. Provide any shop drawings and submittals needed
for the project per Standard Specifications and Special Provisions Section 1-06.
2. Work Plan. Include the following items:
1. Proposed construction sequencing and schedule for the project
2. Mobilization Plan
3. Temporary Erosion and Sediment Control Plan
4. Trenchless Pipe Installation Plan
5. Trench Excavation Safety Systems Plan
6. Disposal Site
3. Construction Surveying. Identify the surveying firm/surveyor and a letter showing
that the surveyor is licensed in the State of Washington.
Please let me know when you would like to have the pre -construction conference. We
will need to notify the private utilities and the City Inspector, so there should be a lead-
time of at least one week before the conference.
Please contact me at 425-430-7279 or ihobson@rentonwa.gov, if you have any
questions.
Sincere, ,
i
John Hobson
Wastewater Utility
Enclosures
H:\File Sys\WWP - WasteWater\WWP-27-3627 Misty Cove Lift Station\Award Info\Gary Harper Award Letter Misty
Cove Lift Station Replacement.doc\1DHtp
PUBLIC WORKS DEPARTMENT p eCiqof
�ht�m�-���..
M E M O R A N D U M
DATE: October 23, 2013
TO: Bonnie Walton, City Clerk
FROM: John Hobson, Wastewater Utility, x7279
SUBJECT: Bid Award for the Misty Cove Lift Station Replacement
Project
The Public Works Department has reviewed the bids that were submitted for the Misty
Cove Lift Station Replacement project and we recommend that the bid be awarded to
Gary Harper Construction, Inc. We are requesting that an agenda bill for "Council
Concur" be prepared for the October 28, 2013, Council Meeting.
The bid opening was on Tuesday, October 22, 2013. There were eight bids received.
There were no errors on any of the bids.
The low bidder is Gary Harper Construction, Inc with a bid of $820,877.70. The
engineer's estimate was $729,599.00.
The project budget amount for the Misty Cove Lift Station Replacement project
(426.465485) is $1,200,000. The low bid for the Misty Cove Lift Station Replacement
project is within the amount approved in the 2013/2014 budget for this project.
The project will replace the existing Misty Cove Lift Station with a new lift station. The
Misty Cove Lift Station is located in an easement at the northeast corner of Misty Cove
Condominiums at 5021 Ripley Lane North.
Attached for your reference, is the bid tabulation showing the engineer's estimate, the
low bid, and the other bids submitted.
If you have any questions, please contact me at 425-430-7279 or by email at
ihobson@rentonwa.gov.
Attachments
cc: Gregg Zimmerman, PW Administrator
Lys Hornsby, Utility Systems Director
Dave Christensen, Wastewater Utility Supervisor
H:\File Sys\WWP - WasteWater\WWP-27-3627 Misty Cove Lift Station\Award Info\Award-Clerk-Misty Cove Lift
Station Replace ment.doc/JDHtp
Project : Misty Cove Lift Station Replacement
BID DATE: October 22, 2013
Item
No. Description
Unit
Est.
Quantity
1
Mobilization, Demobilization, Site Preparation & Clean-up
Lump Sum
1
2
Temporary Erosion and Sedimentation Control
Lump Sum
1
3
Traffic Control
Lump Sum
1
4
Temporary Bypass Pumping System
Lump Sum
1
5
Site Work and Utilities
Lump Sum
1
6
Trenchless Gravity Sewer
Lump Sum
1
7
Unscheduled Excavation
Cubic Yard
50
8
Unscheduled Structural Backfill
Cubic Yard
50
9
Trench Safety and Shoring
Lump Sum
1
10
Dewatering
Lump Sum
1
11
Asphalt Pavement
Ton
70
12
Existing Lift Station Conversion
Lump Sum
1
13
Lift Station Structural
Lump Sum
1
14
Electrical Building Structural
Lump Sum
1
15
Misty Cove Lift Station Pumps and Motors
Lump Sum
1
16
Devil's Elbow Lift Station Pump and Motor
Lump Sum
1
17
Mechanical
Lump Sum
1
18
Electrical
Lump Sum
1
19
Finishes
Lump Sum
1
20
O&M Manuals and On -site Owner Training
Lump Sum
1
21
Construction Records
Lump Sum
1
City of Renton
Engineers Estimate
Unit
Bid
Price
Amount
34,000.00
34,000.00
13.000.00
13,000.00
5,000.00
5,000.00
13,000.00
13,000.00
80,000.00
80,000.00
161,000.00
161,000.00
25.00
1.250.00
30.00
1,500.00
23,000.00
23,000.00
35,000.00
35.000.00
115.00
8,050.00
8,000.00
8,000.00
73,000.00
73,000.00
42,000.00
42,000.00
24.000.00
24,000.00
21,000.00
21,000.00
30,000.00
30,000.00
69,000.00
69,000.00
17,000.00
17,000.00
2,500.00
2,500.00
5,000.00
5,000.00
Subtotal 666,300.00
Tax 9.5% 63,298.50
Total 729,598.50
Rodarte Construction Inc.
Unit
Bid
Price
Amount
75,000.00
75,000.00
3,500.00
3,500.00
6,000.00
6,000.00
8,000.00
8,000.00
145, 000.00
145, 000.00
100, 000.00
100, 000.00
55.00
2,750.00
100.00
5,000.00
75,000.00
75.000.00
25,000.00
25,000.00
160.00
11,200.00
10,000.00
10,000.00
45,000.00
45,000.00
45,000.00
45,000.00
40,000.00
40,000.00
32,000.00
32,000.00
15,000.00
15,000.00
102,000.00
102,000.00
9,750.00
9,750.00
2,500.00
2,500.00
5,000.00
5,000.00
762,700.00
72,456.50
835,156.50
Project : Misty Cove Lift Station Replacement
BID DATE: October 22, 2013
Jansen Inc. Ceccanti R. L. Alia
Item
No.
Description
Unit
Est.
Quantitv.11
Unit
Price
Bid
Amount
Unit
Price
Bid
Amount
Unit
Price
Bid
Amount
1
Mobilization, Demobilization, Site Preparation & Clean-up
Lump Sum
1
74,248.00
74,248.00
57,000.00
57,000.00
80,000.00
80,000.00
2
Temporary Erosion and Sedimentation Control
Lump Sum
1
24,365.00
24,365.00
15,000.00
15,000.00
1,000.00
1,000.00
3
Traffic Control
Lump Sum
1
10,027.00
10,027.00
10,000.00
10,000.00
10,000.00
10,000.00
4
Temporary Bypass Pumping System
Lump Sum
1
10,277.00
10,277.00
37,000.00
37,000.00
10.000.00
10,000.00
5
Site Work and Utilities
Lump Sum
1
47,635.00
47,635.00
200,000.00
200,000.00
70,000.00
70,000.00
6
Trenchless Gravity Sewer
Lump Sum
1
83,032.00
83,032.00
60,000.00
60,000.00
225,000.00
225,000.00
7
Unscheduled Excavation
Cubic Yard
SO
33.00
1,650.00
1 22.00
1,100.00
50.00
2,500.00
8
Unscheduled Structural Backfill
Cubic Yard
50
44.00
2.200.00
22.00
1,100.00
50.00
2,500.00
9
Trench Safety and Shoring
Lump Sum
1
143,173.00
143,173.00
80,000.00
80,000.00
20,000.00
20,000.00
10
Dewatering
Lump Sum
1
. 47,649.00
47,649.00
36,000.00
36,000.00
50,000.00
50,000.00
11
Asphalt Pavement
Ton
70
215.00
15.050.00
170.00
11,900.00
300.00
21,000.00
12
Existing Lift Station Conversion
Lump Sum
1
9,843.00
9,843.00
4,000.00
4,000.00
7,000.00
7,000.00
13
Lift Station Structural
Lump Sum
1
87,189.00
87.189.00
90,000.00
90,000.00
80,000.00
80,000.00
14
Electrical Building Structural
Lump Sum
1
23,677.00
23,677.00
25,000.00
25,000.00
60,000.00
60,000.00
15
Misty Cove Lift Station Pumps and Motors
Lump Sum
1
29,133.00
29.133.00
60,000.00
60,000.00
69,000.00
69.000.00
16
Devil's Elbow Lift Station Pump and Motor
Lump Sum
1
35,852.00
35,852.00
9,000.00
9,000.00
5,000.00
5,000.00
17
Mechanical
Lump Sum
1
37,487.00
37,487.00
9,000.00
9,000.00
49,000.00
49,000.00
18
Electrical
Lump Sum
1
92.379.00
92,379.00
100,000.00
100,000.00
100,000.00
100,000.00
19
Finishes
Lump Sum
1
25,216.00
25,216.00
10,000.00
10,000.00
40.000.00
40,000.00
20
O&M Manuals and On -site Owner Training
Lump Sum
1
2,500.00
2,500.00
2,500.00
2,500.00
2,500.00
2,500.00
21
Construction Records
Lump Sum
1
5,000.00
5,000.00
5,000.00
5,000.00
5,000.00
5,000.00
807,582.00
823,600.00
909,500.00
76,720.29
78,242.00
86,402.50
884,302.29
901,842.00
995,902.50
Project : Misty Cove Lift Station Replacement II Colluccio Construction McClure and Sons, Inc. Road Construction NW
BID DATE: October 22, 2013
Item Unit
No. Description
1
Mobilization, Demobilization, Site Preparation & Clean-up
Lump Sum
2
Temporary Erosion and Sedimentation Control
Lump Sum
3
Traffic Control
Lump Sum
4
Temporary Bypass Pumping System
Lump Sum
5
Site Work and Utilities
Lump Sum
6
Trenchless Gravity Sewer
Lump Sum
7
Unscheduled Excavation
Cultic Yard
8
Unscheduled Structural Backfill
Cubic Yard
9
Trench Safety and Shoring
Lump Sum
10
Dewatering
Lump Sum
11
Asphalt Pavement
Ton
12
Existing Lift Station Conversion
Lump Sum
13
Lift Station Structural
Lump Sum
14
Electrical Building Structural
Lump Sum
15
Misty Cove Lift Station Pumps and Motors
Lump Sum
16
Devil's Elbow Lift Station Pump and Motor
Lump Sum
17
Mechanical
Lump Sum
18
Electrical
Lump Sum
19
Finishes
Lump Sum
20
O&M Manuals and On -site Owner Training
Lump Sum
21
Construction Records
Lump Sum
Est.
1
1
1
1
50
50
1
1
70
1
Unit
Price
Bid
Amount
Unit
Price
Bid
Amount
Unit
Price
Bid
Amount
25,000.00
25,000.00
75,000.00
75,000.00
73,100.00
73,100.00
15,000.00
15,000.00
5,000.00
5,000.00
15,600.00
15,600.00
20,000.00
20,000.00
2,500.00
2,500.00
14,750.00
14.750.00
20,000.00
20.000.00
25,000.00
25,000.00
26,500.00
26,500.00
114,000.00
114,000.00
65,000.00
65,000.00
60,300.00
60.300.00
152,000.00
152,000.00
165,000.00
165,000.00
152,000.00
152,000.00
35.00
1,750.00
50.00
2,500.00
34.00
1,700.00
25.00
1,250.00
50.00
2,500.00
45.00
2,250.00
40,000.00
40,000.00
170,000.00
170,000.00
138,000.00
138,000.00
42,000.00
42,000.00
75,000.00
75,000.00
157,000.00
157,000.00
250.00
17,500.00
216.00
15,120.00
160.00
11,200.00
25,000.00
25,000.00
40,000.00
40,000.00
8,200.00
8,200.00
90,000.00
90,000.00
50,000.00
50,000.00
108,200.00
108,200.00
65,000.00
65,000.00.
28.000.00
28,000.00
80,000.00
80,000.00
35,000.00
35,000.00
65,000.00
65,000.00
55,000.00
55,000.00
32,000.00
32,000.00
25,000.00
25,000.00
29,000.00
29,000.00
95,000.00
95,000.00
66,000.00
66,000.00
31,000.00
31,000.00
100,000.00
100,000.00
105,000.00
105,000.00
105,000.00
105,000.00
15,000.00
15,000.00
57,000.00
57,000.00
11,500.00
11,500.00
2,500.00
2,500.00
2,500.00
2,500.00
2,500.00
2,500.00
5,000.00
5,000.00
5,000.00
5,000.00
5,000.00
5,000.00
913,000.00
1,046,120.00
1,087,800.00
86,735.00
99,381.40
103,341.00
999,735.00
1,145,501.40
1,191,141.00
N
Project : Misty Cove Lift Station Replacement
BID DATE: October 22, 2013
Average Bid
Item
Unit
Est.
Unit
Bid
No.
Description
Quantity
Price
Amount
1
Mobilization, Demobilization, Site Preparation & Clean-up
Lump Sum
1
59,391.33
59,391.33
2
Temporary Erosion and Sedimentation Control
Lump Sum
1
10,427.50
10,427.50
3
Traffic Control
Lump Sum
1
9,554.50
9,554.50
4
Temporary Bypass Pumping System
Lump Sum
1
18,296.17
18,296.17
5
Site Work and Utilities
Lump Sum
1
109,255.83
109,255.83
6
Trenchless Gravity Sewer
Lump Sum
1
123,422.00
123.422.00
7
Unscheduled Excavation
Cubic Yard
50
39.00
1,950.00
8
Unscheduled Structural Backfill
Cubic Yard
50
44.50
2,225.00
9
Trench Safety and Shoring
Lump Sum
1
79,678.83
79,678.83
10
Dewatering
Lump Sum
1
41,458.17
41,458.17
11
Asphalt Pavement
Ton
70
221.33
15,493.33
12
Existing Lift Station Conversion
Lump Sum
1
11,507.17
11,507.17
13
Lift Station Structural
Lump Sum
1
71,998.17
71,998.17
14
Electrical Building Structural
Lump Sum
1
43,212.83
43,212.83
15
Misty Cove Lift Station Pumps and Motors
Lump Sum
1
45,155.50
45,155.50
16
Devil's Elbow Lift Station Pump and Motor
Lump Sum
1
23,008.67
23,008.67
17
Mechanical
Lump Sum
1
39,247.83
39,247.83
18
Electrical
Lump Sum
1
94,946.50
94,946.50
19
Finishes
Lump Sum
1
19,944.33
19,944.33
20
O&M Manuals and On -site Owner Training
Lump Sum
1
2,500.00
2,500.00
21
Construction Records
Lump Sum
1
5,000.00
5,000.00
$827,673.67
$78,629.00
906,302.67
Project : Misty Cove Lift Station Replacement
BID DATE: October 22, 2013
Item
No. Description
Unit
Est.
Quantity
City of Renton Gary1Harp
Engineers Estimate
Unit Bid
Price Amount
OConstruction„il e.,'
-bnit 161d
1Prlce Amount,"
Rodarte Construction Inc.
Unit Bid
Price Amount
1
Mobilization, Demobilization, Site Preparation & Clean-up
Lump Sum
1
34,000.00
34,000.00
45 j1,0W00`
i45,1�0000
75,000.00
75,000.00
2
Temporary Erosion and Sedimentation Control
Lump Sum
1
13,000.00
13,000.00
3 7�00-00
3 700160�
3,500.00
3,500.00
3
Traffic Control
Lump Sum
1
5,000.00
5,000.00
'1 300700
r1 300�00
6,000.00
6,000.00
4
Temporary Bypass Pumping System
Lump Sum
1
13,000.00
13,000.00
{24,500y00.
24 500d00
8,000.00
8,000.00
5
Site Work and Utilities
Lump Sum
1
80,000.00
80,000.00
fV3 900 00'
78^9001Q0
145,000.00
145,000.00
6
Trenchless Gravity Sewer
Lump Sum
1
161,000.00
161,000.00
° 120! 00900 ,,
�QQ-500�
100,000.00
100,000.00
7
Unscheduled Excavation
Cubic Yard
50
25.00
1,250.00
39'r00t,
,1' 950`.'00
55.00
2,750.00
8
Unscheduled Structural Backfill
Cubic Yard
50
30.00
1,500.00
26!00'
1 ;306.'00
100.00
5,000.00
9
Trench Safety and Shoring
Lump Sum
1
23,000.00
23,000.00
Jh 9x900i00;
1,p 9 900 00
75,000.00
75,000.00
10
Dewatering
Lump Sum
1
35,000.00
35,000.00
'48 100;00
48 100?OQ
25,000.00
25,000.00
11
Asphalt Pavement
Ton
70
115.00
8,050.00
233!09�
16 31'0!00
160.00
11,200.00
12
Existing Lift Station Conversion
Lump Sum
1
8,000.00
8,000.00
1'3'200`OQ•,
13 20000
10,000.00
10,000.00
13
Lift Station Structural
Lump Sum
1
73,000.00
73,000.00
39180,QA00=
39,800!00
45,000.00
45,000.00
14
Electrical Building Structural
Lump Sum
1
42,000.00
42,000.00
40y600(00;
40 600f00
45,000.00
45,000.00
15
Misty Cove Lift Station Pumps and Motors
Lump Sum
1
24,000.00
24,000.00
,.377800°6&
437;800,00
40,000.00
40,000.00
16
Devil's Elbow Lift Station Pump and Motor
Lump Sum
1
21,000.00
21,000.00
;24' 200:-QOi , ;°:
;24;20000
32,000.00
32,000.00
17
Mechanical
Lump Sum
1
30,000.00
30,000.00
3dy000,06
t.'30!000'00
15,000.00
15,000.00
18
Electrical
Lump Sum
1
69,000.00
69,000.00
'7�5S300r00f,
745 300100
102,000.00
102,000.00
19
Finishes
Lump Sum
1
17,000.00
17,000.00
ii! 700"00
10�Z00i00
9,750.00
9,750.00
20
O&M Manuals and On -site Owner Training
Lump Sum
1
2,500.00
2,500.00
21500 001,
2'500 00
2,500.00
2,500.00
21
Construction Records
Lump Sum
1
5,000.00
5,000.00
;5 000"00,,
5'000;OQ
5,000.00
5,000.00
Subtotal
666,300.00
749 66Q?00
762,700.00
Tax 9.5%
63,298.50
72,456.50
Total
729,598.50
<" 1820,877f 70
835,156.50
Project : Misty Cove Lift Station Replacement
BID DATE: October 22, 2013
Item
No. Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Mobilization, Demobilization, Site Preparation & Clean-up
Temporary Erosion and Sedimentation Control
Traffic Control
Temporary Bypass Pumping System
Site Work and Utilities
Trenchless Gravity Sewer
Unscheduled Excavation
Unscheduled Structural Backfill
Trench Safety and Shoring
Dewatering
Asphalt Pavement
Existing Lift Station Conversion
Lift Station Structural
Electrical Building Structural
Misty Cove Lift Station Pumps and Motors
Devil's Elbow Lift Station Pump and Motor
Mechanical
Electrical
Finishes
O&M Manuals and On -site Owner Training
Construction Records
Unit
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Cubic Yard
Cubic Yard
Lump Sum
Lump Sum
Ton
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Est.
Quant
1
1
1
1
1
1
50
50
1
1
70
1
1
1
1
1
1
1
1
1
1
Jansen Inc.
Ceccanti
R. L. Alia
Unit
Bid
Unit
Bid
Unit
Bid
Price
Amount
Price
Amount
Price
Amount
74,248.00
74,248.00
57,000.00
57,000.00
80,000.00
80,000.00
24,365.00
24,365.00
15,000.00
15,000.00
1,000.00
1,000.00
10, 027.00
10, 027.00
10, 000.00
10, 000.00
10, 000.00
10, 000.00
10,277.00
10,277.00
37,000.00
37,000.00
10,000.00
10,000.00
47,635.00
47,635.00
200,000.00
200,000.00
70,000.00
70,000.00
83,032.00
83,032.00
60,000.00
60,000.00
225,000.00
225,000.00
33.00
1,650.00
22.00
1,100.00
50.00
2,500.00
44.00
2,200.00
22.00
1,100.00
50.00
2,500.00
143,173.00
143,173.00
80,000.00
80,000.00
20,000.00
20,000.00
47,649.00
47,649.00
36,000.00
36,000.00
50,000.00
50,000.00
215.00
15,050.00
170.00
11,900.00
300.00
21,000.00
9,843.00
9,843.00
4,000.00
4,000.00
7,000.00
7,000.00
87,189.00
87,189.00
90,000.00
90,000.00
80,000.00
80,000.00
23,677.00
23,677.00
25,000.00
25,000.00
60,000.00
60,000.00
29,133.00
29,133.00
60,000.00
60,000.00
69,000.00
69,000.00
35,852.00
35,852.00
9,000.00
9,000.00
5,000.00
5,000.00
37,487.00
37,487.00
9,000.00
9,000.00
49,000.00
49,000.00
92,379.00
92,379.00
100,000.00
100,000.00
100,000.00
100,000.00
25,216.00
25,216.00
10,000.00
10,000.00
40,000.00
40,000.00
2,500.00
2,500.00
2,500.00
2,500.00
2,500.00
2,500.00
5,000.00
5,000.00
5,000.00
5,000.00
5,000.00
5,000.00
807,582.00
823,600.00
909,500.00
76,720.29
78,242.00
86,402.50
884,302.29
901,842.00
995,902.50
Project : Misty Cove Lift Station Replacement
BID DATE: October 22, 2013
Item
No. Description
Unit
1
Mobilization, Demobilization, Site Preparation & Clean-up
Lump Sum
2
Temporary Erosion and Sedimentation Control
Lump Sum
3
Traffic Control
Lump Sum
4
Temporary Bypass Pumping System
Lump Sum
5
Site Work and Utilities
Lump Sum
6
Trenchless Gravity Sewer
Lump Sum
7
Unscheduled Excavation
Cubic Yard
8
Unscheduled Structural Backfill
Cubic Yard
9
Trench Safety and Shoring
Lump Sum
10
Dewatering
Lump Sum
11
Asphalt Pavement
Ton
12
Existing Lift Station Conversion
Lump Sum
13
Lift Station Structural
Lump Sum
14
Electrical Building Structural
Lump Sum
15
Misty Cove Lift Station Pumps and Motors
Lump Sum
16
Devil's Elbow Lift Station Pump and Motor
Lump Sum
17
Mechanical
Lump Sum
18
Electrical
Lump Sum
19
Finishes
Lump Sum
20
O&M Manuals and On -site Owner Training
Lump Sum
21
Construction Records
Lump Sum
Est.
Quani
1
1
1
1
1
1
50
50
1
1
70
1
1
1
1
1
1
1
1
1
1
Colluccio Construction McClure and Sons, Inc. Road Construction NW
Unit
Price
25,000.00
15,000.00
20,000.00
20,000.00
114,000.00
152,000.00
35.00
25.00
40,000.00
42,000.00
250.00
25,000.00
90,000.00
65,000.00
35,000.00
32,000.00
95,000.00
100,000.00
15, 000.00
2,500.00
5,000.00
Bid Unit Bid
Amount Price Amount
25,000.00
75,000.00
75,000.00
15,000.00
5,000.00
5,000.00
20,000.00
2,500.00
2,500.00
20,000.00
25,000.00
25,000.00
114,000.00
65,000.00
65,000.00
152, 000.00
165,000.00
165, 000.00
1,750.00
50.00
2,500.00
1,250.00
50.00
2,500.00
40, 000.00
170, 000.00
170, 000.00
42,000.00
75,000.00
75,000.00
17,500.00
216.00
15,120.00
25,000.00
40,000.00
40,000.00
90,000.00
50,000.00
50,000.00
65,000.00
28,000.00
28,000.00
35,000.00
65,000.00
65,000.00
32,000.00
25,000.00
25,000.00
95,000.00
66,000.00
66,000.00
100, 000.00
105,000.00
105, 000.00
15,000.00
57,000.00
57,000.00
2,500.00
-
2,500.00
2,500.00
5,000.00
5,000.00
5,000.00
913,000.00
1,046,120.00
86,735.00
99,381.40
999, 735.00
1,145,501.40
Unit
Bid
Price
Amount
73,100.00
73,100.00
15,600.00
15,600.00
14,750.00
14,750.00
26,500.00
26,500.00
60,300.00
60,300.00
152, 000.00
152, 000.00
34.00
1,700.00
45.00
2,250.00
138, 000.00
138, 000.00
157, 000.00
157, 000.00
160.00
11,200.00
8,200.00
8,200.00
108, 200.00
108, 200.00
80,000.00
80,000.00
55,000.00
55,000.00
29,000.00
29,000.00
31,000.00
31,000.00
105,000.00
105,000.00
11,500.00
11,500.00
2,500.00
2,500.00
5,000.00
5,000.00
1,087,800.00
103,341.00
1,191,141.00
Project : Misty Cove Lift Station Replacement
BID DATE: October 22, 2013
Item
No. Description
1 Mobilization, Demobilization, Site Preparation & Clean-up
2 Temporary Erosion and Sedimentation Control
3 Traffic Control
4 Temporary Bypass Pumping System
5 Site Work and Utilities
6 Trenchless Gravity Sewer
7 Unscheduled Excavation
8 Unscheduled Structural Backfill
9 Trench Safety and Shoring
10 Dewatering
11 Asphalt Pavement
12 Existing Lift Station Conversion
13 Lift Station Structural
14 Electrical Building Structural
15 Misty Cove Lift Station Pumps and Motors
16 Devil's Elbow Lift Station Pump and Motor
17 Mechanical
18 Electrical
19 Finishes
20 O&M Manuals and On -site Owner Training
21 Construction Records
Unit Est.
Quani
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Cubic Yard
Cubic Yard
Lump Sum
Lump Sum
Ton
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
1
1
1
1
1
50
50
1
1
70
1
1
1
1
1
1
1
1
1
1
Average Bid
Unit
Price
59,391.33
10,427.50
9,554.50,
18,296.17
109,255.83
123,422.00
39.00
44.50
79,678.83
41,458.17
221.33
11,507.17
71,998.17
43,212.83
45,155.50
23, 008.67
39,247.83
94, 946.50
19, 944.33
2,500.00
5,000.00
Bid
Amount
59,391.33
10,427.50
9,554.50
18,296.17
109,255.83
123,422.00
1,950.00
2,225.00
79,678.83
41,458.17
15,493.33
11,507.17
71,998.17
43,212.83
45,155.50
23,008.67
39,247.83
94, 946.50
19,944.33
2,500.00
5,000.00
$827,673.67
$78,629.00
906,302.67
Oct 1413 04:14p
p.2
REQUEST FOR APPROVAL TO BID
FAX Response for Job: Renton (City of) - Misty Cove Lift Station
(Replacement) CAG13178
From: RH2 Engineering, Inc.
Mark your selection with an "X" and fax to 1-727-373-0207.
Approved to Bid per Addendum #
Siemens Listed in Division 16; Siemens SPD Approved to Bid
For future reference, when Siemens is listed as an approved manufacturer, you
may automatically assume that Siemens SPD will also be approved to bid upon
meeting the specification. Please note in your database that Prior Approval
packages are unnecessary.
_. Considered as Equivalent
Will Evaluate During Shop Drawing Process
X Disapproved
More Information Required (please note in comments)
Send Siemens SPD Product Binder
Name: r.l a�zton Anderson
Signature: CLAYTON ANDERSON Date: i o/i4/2013
Comments:_S2ecifications require 16C kA Per Phase surge current
raring Siemens SPD anly offers 150 kA Siemens only offers node
ratings of 50 kA for both line and neutral toground. Joslyn
and IT Protector offer 80 kA. Not ecrual to specified.
We do not always receive addenda on a timely basis and therefore would appreciate
notification of your decision by fax.
Fax to 1-727-373-0207
Thank you,
Alisa Hartsfield ,
Siemens Sales Support
Siemens Industry Inc.
SPD Sales & Technical Support