Loading...
HomeMy WebLinkAboutWWP273627 (4)Check Request for Non Vendor Refund or Reimbursement This form is to be used only for one time vendors. Please contact Accounts Payable if you have any questions regarding one time vendors. Check will be included in the next scheduled A/P check run and mailed after Council approval. Check Request Info: Date of request: Oct. 21, 2014 Requestor's name: Requestor's department/division: Requestor's ext. #: John Hobson Public Works 7279 Payable to: Norma Crosetto Mail address for check: 5025 Ripley Lane N, Renton_, WA 98056 Check amount: Account number(s) to charge: Amount per account #: $1,052.78 426.465485.018.594.35.63.000 Reason for refund or reimbursement: Reimbursement for repair of the residential driveway gate at 5025 Ripley Ln N as a result of the City's Misty Cove Lift Station construction. Check handling request: Send check to John Hobson for inclusion with letter to Mrs. Crosetto. *Annroval Sianature: Reque '16r—s D---en tT6r-e-,(,-t Admi trator, ivision Diror des(nee: Signature: ' AK type name of signer on above line Date: d �/ The person approving this check request must be an authorized signer. HAFile Sys\WWP - WasteWater\W WP-273627 Misty Cove Lilt Station\Pay Estimates\Crosetto (late Repair Reimbursement - Check Reyuesi.doc Online Typeable Form, luh. 2007 Automated Equipment Company DBA Automated Gatcs &'Equipment Specializing In Gates and Access Control Systems 10847 E. Marginal Way S. Seattle. WA98168 (206)767-9080 FAX (206) 767-9077 1-800-338-7649 wwW.aegates.com Bill To Norma Crosetto 5025 11 pley Lane North Renton. WA 98056 Invoice Date Invoice #� 9/30/2014 205057 J Ship To -� Norma Crosetto 5025 Ripley Lane North Renton. WA 98056 'P'0'.,No. r ':. _: _.....,.-.,.. Terms Re P Shi p Via F.O.B. Project r, { .S04877& 5048 DUE UPON RECEIPT D13 9/19/2014 ON SI'rE t S, 'Quantity Item Code Description Price Each Amount Name: Maria - PLEASE CALL TO CONFIRM DA,rF, AND TIME Phone: 425-25 1-4000 ext 147 Problem: The,gate.is not closing or opening (currently stuck open). Believes it could be loops or photo eyes Problem:They can't program thru the phone, they want to get it working with the phone like it was. 4.5 39 Reg Svc Labor Service Labor 115.00 517.50T 8/22 Found the FAAC photo eyes not working, replaced eyes and working ok. Gate still not working, tried to reset limits and gate will move a couple of inches then stops, called tech support and the said to replace the RPM sensor. 9/8 Replaced the RPM sensor, adjusted limits and tested and it's working properly. 1 FAAC Photo Eyes FAAC Photo Eye 244.00 244.00T I 5000.2-COGSE..Q RPM Sensor for RSL 25.95 25.95T 1.5 39 Reg Svc Labor Service Labor 115.00 172.50T 9/19 Called back and found the -phone curd plugged into the li j wrong port. Reconnected and tested and it's working. This is not warranty, different problem. Fuel Recovery Fuel Surcharge 1.50 1.501"1 Subtotal 961.45 Renton Sales Tax Group' 91.33 Pay online at: https://ipn.itituit.com/bfg5w5bz We appreciate your business! Please pay from invoice. Total 1 Late payment will be charged. 1.5% per month at an annual percentage rate of 18% S 1.05_'.78 (` - s ., - 1, +` . ' 'a •: b 5aS•L`r rn.%r...+i., d . _V s �: `,'.,.:r,1 �.. ,- Dents L'aw Mayor , �. o•' r S. S 'i t� ^O s` -ei tsL n-•,+ e { r. . r 'J,,issN'Cc=i•�E''P';s�s`'Q`+�,._Ys...r`�'... P`ublicWorks:0eparem'ent Gre,gg�ZI merman PE,A'dmmistrator ; i... i r . '`October31, 2,014 t ms Norma�Gtbsetto <. 5025,R ijp16y Lane;Np fth :Reriton; WA 98056 ,. RE REIMBURSEMENT-FOR;ACCESS`GATE;REPAA AT 5025Ali "' Y: LANE NORTH a Dear Ms Cros`etto _ ;I Enclosed please find, a check, 61he,amount of $1 052 78 for the reimbursement of the «'4' r u X cost of rep�a r toyour access gate as4a'result4of tihe}City's:=1Vli ty Cove;L'ift Stati aff Pro`jeet r . -.construction -` =� i •' - - �?• .' - ,•r , ' _ _ :UVe apologize;for'any inconvenience that this may Faye caused. �lf,you�have any,: , z - _ questions, -lease contact me,at`425 43,0` 727;9 or fjy3ema'il,a. jhobson;@ entonwa:gov.- M. , Sincere `, _ ,. to ' . .; , • . __ , ,• ,• Jo n Hobson - Wastewater'Utility Projett-Manager Erielo-sure H:\File Sys\WWP =• WasteWater, WWP:27-3627 Misty Cove Lift.Station\Pa,y Estimates\Crosetto Letter for Gate Reirnbirsemerit.doc\JpHtp' Renton GityHalf • 1055'South Grady Way •Renton, Washington 98057 • rentonwa;gov PUBLIC WORKS DEPARTMENT p Cityof M E M O R A N D U M DATE: October 7, 2014 TO: Natalie Wissbrod, Finance Accounting Assistant FROM: John Hobson, Wastewater Engineering, x7279 7— SUBJECT: CAG 13-178, Misty Cove Lift Station Replacement, Gary Harper Construction, Inc. Please process the enclosed final -pay estimate for this project. The project was accepted by City Council at its regular meeting on October 6, 2014. The.following documents are enclosed: • Copy of the Agenda Bill for Council acceptance of project and final pay estimate • Notice of Completion of Public Works Contract • Original of final pay estimate • Affidavits of Prevailing Wages Paid • Statements of Intent to Pay Prevailing Wage Thank you very much for your help. Enclosures H:\File Sys\WWP - WasteWater\WWP-27-3627 Misty Cove Lift Station\Pay Estimates\Finance notice for final payment Misty Cove Lift Station Replacement.doc\JDHtp CITY OF RENTON COUNCIL AGENDA BILL Al #: Submitting Data: Public Works For Agenda of: Dept/Div/Board.. Utility Systems Division October 6, 2014 Staff Contact...... John Hobson, Wastewater, x7279 Agenda Status Consent .............. X Subject: Public Hearing.`"—"''�u - Final Pay Estimate CAG 13-178 Correspond nce.. ,)d C. _ aL Misty Cove Lift Station Replacement Ordinance.......... ME `�� !T AUD ATE Contractor: Gary Harper Construction, Inc. Resolution.. __ r Old Busines ....., _.,_ Exhibits: New Busine. Final Pay Estimate Study Sessi n i. Notice Of Completion of Public Works Contract Information......... �� I Recommended Action: Approvals: Council Concur Legal Dept......... Finance Dept...... Other ............... Fiscal Impact: Expenditure Required... $24,692.25 (Final Pay Est.) Transfer/Amendment....... Amount Budgeted....... $30,000 Revenue Generated......... Total Project Budget $1,200,000 City Share Total Project.. SUMMARY OF ACTION: The project was awarded on November 4, 2013, construction began on February 6, 2014, and was completed on September 24, 2014. The original contract amount was $820,877.70 and the final amount is $859,339.02, an increase of $38,461.32, or about 4.7%. The cost increase was due to additional shoring and dewatering work needed, repair of a mis-marked sewer main that was damaged during excavation and additional work to locate the existing Misty Cove Condominium's sewer force main for decommissioning. The final cost was within the amount budgeted for the project. The approved 2013/2014 budget for the Misty Cove Lift Station Replacement is $1,200,000. The amount budgeted for this project is enough to cover the construction costs of this project. STAFF RECOMMENDATION: Accept the project, approve the final pay estimate in the amount of $24,692.25, and release the retainage in the amount of $39,239.23 after 60 days, subject to the receipt of all required authorizations. H:\File Sys\WWP - Waste Water\WWP-27-3627 Misty Cove Lift Station\Pay Estimates\Agenda Bill Final Pay Misty Cove Lift Station Replacement.doc\JDHtp CITY OF RENTON COUNCIL AGENDA BILL Al #: Submitting Data: Public Works For Agenda of: Dept/Div/Board.. Utility Systems Division October 6, 2014 Agenda Status Staff Contact...... John Hobson, Wastewater, x7279 Consent .............. X Public Hearing.. Subject: Final Pay Estimate CAG 13-178 Correspondence.. Misty Cove Lift Station Replacement Ordinance ............. Contractor: Gary Harper Construction, Inc. Resolution............ Old Business........ New Business....... Exhibits:' Final Pay Estimate Study Sessions...... Notice Of Completion of Public Works Contract Information......... Recommended Action: Approvals: Council Concur Legal Dept......... Finance Dept...... Other ............... Fiscal Impact: Expenditure Required... $24,692.25 (Final Pay Est.) Transfer/Amendment....... Amount Budgeted....... $30,000 Revenue Generated......... Total Project Budget $1,200,000 City Share Total Project.. SUMMARY OF ACTION: The project was awarded on November 4, 2013, construction began on February 6, 2014, and was completed on September 24, 2014. The original contract amount was $820,877.70 and the final amount is $859,339.02, an increase of $38,461.32, or about 4.7%. The cost increase was due to additional shoring and dewatering work needed, repair of a mis-marked sewer main that was damaged during excavation and additional work to locate the existing Misty Cove Condominium's sewer force main for decommissioning. The final cost was within the amount budgeted for the project. The approved 2013/2014 budget for the Misty Cove Lift Station Replacement is $1,200,000. The amount budgeted for this project is enough to cover the construction costs of this project. STAFF RECOMMENDATION: Accept the project, approve the final pay estimate in the amount of $24,692.25, and release the retainage in the amount of $39,239.23 after 60 days, subject to the receipt of all required authorizations. H:\File Sys\WWP - WasteWater\WWP-27-3627 Misty Cove Lift Station\Pay Estimates\Agenda Bill Final Pay Misty Cove Lift Station Replacement. doc\JDHtp TO: FINANCE DIRECTOR FROM: PUBLIC WORKS ADMINISTRATOR CONTRACTOR: Gary Harper Construction CONTRACT NO. CAG-13-178 PO# 18/0001884 ESTIMATE NO. 7 (FINAL) PROJECT: Misty Cove Lift Station Replacement 1. CONTRACTOR EARNINGS THIS ESTIMATE -Z SALES TAX @ 9.50% 3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $22,550.00 $2,142.25 4. EARNINGS PREVIOUSLY PAID CONTRACTOR $724,122.76 5. * EARNINGS DUE CONTRACTOR THIS ESTIMATE $21,422.50 6. SUBTOTAL - CONTRACTOR PAYMENTS 7. RETAINAGE ON PREVIOUS EARNINGS $38,111.73 8. ** RETAINAGE ON EARNINGS THIS ESTIMATE $1,127.50 9. SUBTOTAL - RETAINAGE 10. SALES TAX PREVIOUSLY PAID $72,412.28 11. SALES TAX DUE THIS ESTIMATE $2,142.25 12. SUBTOTAL - SALES TAX * (95% x LINE 1) ** (RETAINAGE: 5%) GRAND TOTAL: FINANCE DEPARTMENT ACTION: PAYMENT TO CONTRACTOR (Lines 5 and 11): ACCOUNT # 426.465485.018.594.35.63.000 RETAINED AMOUNT (Line 8): ACCOUNT # 426.465485.018.594.35.63.000 CHARTER 116, LAWS OF 1965 CITY OF RENTON CERTIFICATION $23,564.75 # 7 (FINAL) $1,127.50 # 7 (FINAL) TOTAL THIS ESTIMATE: I, THE UNDERSIGNED DO HEREBY CERTIFY UNDER PENALTY OF PERJURY, THAT THE MATERIALS HAVE BEEN FURNISHED, THE SERVICES RENDERED OR THE LABOR PERFORMED AS DESCRIBED HEREIN, AND THAT THE CLAIM IS A JUST, DUE AND UNPAID OBLIGATION AGAINST THE CITY OF RENTON, AND THAT I AM - AUTHORIZED TO AUTHENTICATE AND CERTI Y TO SAID IM Signed:, %`�ilU'll�l $24,692.25 $745,545.26 $39,239.23 $74,554.53 $859,339.02 $23,564.75 '$1,127.50 $24,692.25 Printed On: 09/23/2014 City of Renton Public Works Department Page 1 Printed On: 09/23/2014 City of Renton Public Works Department Page,1 Project: Misty Cove Lift Station Replacement Contractor: Gary Harper Construction Item Description No. Contract Number: Pay Estimate 7 (FINAL) Closing Date: Unit Est. Unit Previous Previous Quantity Price Quantity Amount Schedule A 001. Mobilization, Demobilization, Site Preparation & Clean-up Lump Sum 1 $45.100.00 002. Temporary Erosion and Sedimentation Control Lump Sum 1 $3,700.00 003. Traffic Control Lump Sum 1 $1,300.00 004. Temporary Bypass Pumping System Lump Sum 1 $24,500.00 005. Site Work and Utilities Lump Sum 1 $78,900.00 006. Trenchless Gravity Sewer Lump Sum 1 $120,500.00 007. Unscheduled Excavation Cubic Yard 50 $39.00 008. Unscheduled Structural Backfill Cubic Yard 50 $26.00 009. Trench Safety and Shoring Lump Sum 1 $119,900.00 010. Dewatering Lump Sum 1 $48,100.00 011. Asphalt Pavement Ton 70 $233.00 012. Existing Lift Station Conversion Lump Sum 1 $13,200.00 013. Lift Station Structural Lump Sum 1 $39,800.00 014. Electrical Building Structural Lump Sum 1 $40,600.00 015. Misty Cove Lift Station Pumps and Motors Lump Sum 1 $37,800.00 016. Devil's Elbow Lift Station Pump and Motor Lump Sum 1 $24,200.00 017. Mechanical Lump Sum 1 $30,000.00 018. Electrical Lump Sum 1 $75,300.00 019. Finishes Lump Sum 1 $19,700.00 020. O&M Manuals and On -site Owner Training Lump Sum 1 $2,500.00 021, Construction Records Lump Sum 1 $5,000.00 022. C.O. #1 Lump Sum 1 - $8,439.57 000. C.O. #2 Lump Sum 1 $1B,552.94 Subtotal 9.5 % Sales Tax Total CAG-13.17E 09/24/2014 This This Total Total Quantity Amount Quantity Amour 0.50 $22,550.00 0,50 $22.550.00 1.00 $45,100.00 1.00 $3,700.00 $0.00 1.00 $3,700.00 1.00 $1,300.00 $0.00 1.00 $1,300.00 1.00 $24,500.00 $0.00 1.00 $24,500.00 1.00 $78.900.00 $0.00 1.OD $78,900.00 1.00 $120,500.00 $0.00 1.00 $120,500.00 10.00 $390.00 $0.00 10.00 $390.00 10.00 $260.00 $0.00 10.00 $260.00 1.00 $119,900.00 $0.00 1.00 $119,900.00 1.00 $48.100.00 $0.00 1.00 $48,100.00 116.06 $27,041.98 $0.00 116.06 $27,041.98 1.00 $13,200.00 $0.00 1.00 $13,200.00 1.00 $39.800.00 $0.00 1.00 $39,800.00 1.00 $40,600.00 $0.00 1.00 $40,600.00 1.00 $37,800.00 $0.00 1.00 $37,800.00 1.00 $24,200.00 $0.00 1.00 $24,200.00 1.00 $30,000.00 $0.00 1.00 $30,000.00 1.00 $75,300.00 $0.00 1.00 $75,300.00 1.00 $19,700.00 $0.00 1.00 $19,700.00 1.00 $2,500.00 $0.00 1.00 $2,500.00 1.00 $5,000.00 .$0.00 1.00 $5.000.00 1.00 $8,439.57 $0.00 1.00 $8,439.57 1.00 $18,552.94 $0.00 1.00 $18,552.94 $762,234.49 $22,550.00 $784,784.49 $72,412.28 $2,142.25 $74,554.53 $834,646.77 $24,692.25 $859,339.02 9It4/r 4- Hu5 NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT City of Renton 1055 South Grady Way Renton, WA 98057 UBI Number: 177000094 Contractor's UBI Number: 601606620 Date: 10/06/2014 Assigned to: Date Assigned: Notice is herehv given relative to the completion of contract or nroiect described below Project Name Contract Number Job Order Contracting Misty Cove Lift Station Replacement CAG-13-178 ❑ Yes 0 No Description of Work Done/Include Jobsite Address(es) Construction of a new sewage lift station and control building and abandonment of an existing sewage lift station. Federally funded road transportation project? ❑ Yes No Contractor's Name Telephone Number Affidavit ID* Gary Harper Construction, Inc. 1360-863-1955 530784 Contractor Address 14831 223rd St. SE, Snohomish, WA 98296-3989 If Retainage is Bonded, List Surety's Name (or attach a copy) N/A Surety Agent's Address Date Contract Awarded Date Work Commenced Date Work Completed Date Work Accepted November 4, 2013 February 6, 2014 1 September 24, 2014 October 6, 2014 Contract Amount $ Additions ( +) $ Reductions (-) $ Sub -Total $ Amount of Sales Tax Paid at 9.500% 749,660.00 35,124.49 784,784.49 Liquidated Damages $ Amount Disbursed $ Amount Retained $ (If various rates apply, please send a breakdown) $ 74,554.53 TOTAL $ 859,339.02 NOTE: These two totals must be equal Please List all Subcontractors and Sub -tiers Below: 820,099.79 39,239.23 TOTAL $ 859,339.02 Subcontractor's Name: UBI Number: (Required) Affidavit ID* Designed Groundwater Sery LLC 602911176 509252 Star Roofing & Construction, Inc. 602116852 524648 Holt Services 602690511 507848 WCCL Systems LLC 603278120 514250 Bravo Environmental NW, Inc. 602946216 530684 Advanced Power LLC 602633757 531530 Armadillo Boring, Inc. 603219061 504562 Johnston Construction Co., Inc. 278046559 514309 F215-038-000 07-2012 REV 31 0020e (07/06/12) Continued on page 2 Please List all Subcontractors and Sub -tiers Below: Subcontractor's Name: UBI Number: (Required) Affidavit ID* Lakeridge Paving Co. LLC 601592135 517797 Cascade Drilling. L.P. 602948556 503987 Downing Diversified LLC 603191871 502459 Tacoma Pump & Drilling Co., Inc. 278039649 509110 Miles Sand & Gravel Company 171004760 531454 Sparrow Fence LLC 603238344 523403 Cadman Inc. 176000099 Ct'--c ,�.. ..� r r .r' - { �'. S y: ..•, -7 r : S omments , w X.. Le h r; ,u 4 L l Y .fir -.: � :y t,s 'f�' ' ar - x' aM1 7 q r... - s J r f kh PK i ; fK k 3� Contact Name: Natalie Wissbrod Title: Accounting Assistant Email Address: nwissbrod@rentonwa.gov Phone Number: 425-430-6919 NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of all release certificates. Affidavit ID* - Provide known ones at this time. No LNI release will be granted until all affidavits are completed. Submitting Form: Please submit the completed form to all three agencies below. For a faster response, please submit by e-mail. Washington State epartment of Revenue ublic Works Section PO Box 47474 Olympia WA 98504-7474 (360) 725-7588 FAX (360) 664-4159 PWC@dor.wa.gov Vashington State lepartment of Labor and Industries :ontract Release 'O Box 44274 Olympia, WA 98504-4272 (360) 902-5772 FAX (360) 902-6897 ContractRelease@lni.wa.gov B `"/ashington State mployment Security Department egistration, Inquiry, Standards & -;oordination Unit PO Box 9046 Olympia WA98507-9046 (360) 902-9450 Fax (360) 902-9287 publicworks@esd.wa.gov For tax assistance or to request this document in an alternate format, visit http://dor.wa.gov or call 1-800-647-7706. Teletype (TTY) users may call (360) 705-6718. F215-038-000 07-2012 REV 31 0020e (07/06/12) Gary Harper Construction, Inc. Pay Request. No. 6 Misty Cove Lift Station Replacement 14831 223rd St SE, Snohomish, WA 98296 07/08/14 - 09/09/14 City of Renton Project #WWP-27-3678 Ph: (360) 863-1955, Fax: (360) 863-1966 Bid No. Bid Item Unit Price Qty Amount as Bid Current Completion Amount % Previous Completion Amount % Total Completion Amount % Balance to Complete Amount % 1 Mob, demob, site prep & clean up LS 45,100.00 22,550.00 50% 22,550.00 50% 45,100.00 100% - 0% 2 Temporary erosion & sediment control LS 1 3,700.00 0% 3,700.00 100% 3,700.00 10.0% - 0% 3 Traffic Control LS 1,300.00 0% 1,300.00 100% 1,300.00 100% - 0% 4 Temorary bypass pumping system LS 24,500.00 24,500.00 .100% 0% 24,500.00 100% - 0% 5 Site work & utilities LS 78,900.00 0% 78,900,00 100% 78,900.00 100% - 0% 6 Trenchless gravity sewer LS 120,500.00 0% 120,500.00 100% 120,500.00 100% - 0% 7 Unscheduled excavation 39.00 50 CY 1,950.00 CY 390.00 10CY 390.00 10 CY 1,560.00 40 CY 8 Unscheduled structural backfill 26.00 50 CY 1,300.00 CY 260.00 10 CY 260.00 10 CY 1,040.00 40 CY 9 Trench safety & shoring LS 119,900.00 0% 119,900.00 100% 119,900.00 100% - 0% 10 Dewatering LS 48,100.00 0% 48,100.00 100% 48,100.00 100% - 0% 11 Asphalt pavement 233.00 70Ton 16,310.00 27,041.98 116.06TN 27,041.98 116.06TN (10,731.98) -66% 12 Existing Lift Station conversion LS 13,200.00 13,200.00 100% 0% 13,200.00 100% - 0% 13 Lift Station structural LS 39,800.00 0% 39,800.00 100% 39,800.00 100% - 0% 14 Electrical building structural LS 40,600.00 0% 40,600.00 100% 40,600.00 100% - 0% 15 Misty Cove Lift Station pumps & motors LS 37,800.00 1,134.00 3% 36,666.00 97% 37,800.00 100% - 0% 16 Devils Elbow Lift Station pump & motor LS 24,200.00 0% 24,200.00 100% 24,200.00 100% - 0% 17 Mechanical LS 30,000.00 0% 30,000.00 100% 30,000.00 100% - 0% 18 Electrical LS 75,300.00 2,259.00 11% 73,041.00 97% 75,300.00 100% - 0% 19 Finishes LS 19,700.00 0% 19,700.00 100% 19,700:00 100% - 0% 20 O&M manuals and on -site owner training LS 2,500.00 2,500.00 100% 1 0% 2,500.00 100%. - 0% 21 Construction records LS 5,000.00 2,500.00 50% 2,500.00 50% 5,000.00 100% - 0% 22 Change Order No. 1 LS 8,439.57 0% 8,439.57 100% 8,439.57 100% 0% 23 Change Order No. 2 LS 18,552.94 0% 18,552.94 100%. 18,552.94 100% 0% Totals $ 776,652.51 $ 68,643.00 9% $ 716,141.49 92% $ 784,784.49 101% $ (8,131.98) -1% WSST 9.5% 6,521.09 1 68,033.44 74,554.53 Less 5% Retention (3,432.15) (35,807.07) (39,239.22) Less Previous Payments (748,367.86) (748,367.86) Amount Due: $ 71,731.94 $ (0.00) $ 71,731.93 Advanced Power LLC PO Box 13705 Mill Creek, WA 99082 Bill To Gary Harper Construction Inc 14831 223rd St SE Snohomish WA 98296-3989 Invoice Date Invoice # 9/9/2014 25250 T P.O. No. Terms Project 1319-03 Nct 30 1319-Misty Cove Lir... Description Est Amt Prior Amt Prior % Curr % Total % Amount MISTY COVE LIFT STATION REPLACEMENT ELECTRICAL PANELS 21,325.00 21,324.22 100.00% 0.00% 100.00% 0.78 LIGI•ITING 3,200.00 3,200,00 100.00% 0.00% 100.00% 0.00 UNDERGROUND ELECTRICAL & 11,395.00 11,395.00 100.00% 0.00% 100.00% 0.00 VAULTS PUMP STATION ELECTRICAL 31,902.00 30,306.90 95.00% 5.00% 100.00% 1,595.10 INSTRUMENTATION 4,000.00 3,200.00 80.00% 20.00% 100.00% 800.00 Credit - Electrical Vault -964.00 -964.00 100.00% 0.00% 100.00% 0.00 Total $2,395.88 Gary Harper Construction, Inc. 14831223rd St SE, Snohomish, WA 98296 Ph: (360) 863-1955, Fax: (360) 863-1966 Pay Request No. 5 06 /07/14 - 07/07/14 Misty Cove Lift Station Replacement- City of Renton Project #WWP-27-3678 Bid No. Bid Item Unit Price Qty Amount as Bid Current Completion Amount % Previous Completion Amount % Total Completion Amount % Balance to Complete Amount 1 Mob, demob, site prep & clean up LS 45,100.00 0% 22,550.00 50% 22,550.00 50% 22,550.00 50% 2 Temporary erosion & sediment control LS 3,700.00 0% 3,700.00 100% 3,700.00 100% - 0% 3 Traffic Control LS 1,300.00 0% 1,300.00 .100%1 1,300.00 100% - 0% 4 Temorary bypass pumping system LS 24,500.00 0% 0% - 0% 24,500.00 100% 5 Site work & utilities LS 78,900.00 ✓ 1,578.00 2% 77,322.00 98% 78,900.00 100% - 0% 6 Trenchless gravity sewer LS 120,500.00 0% 120,500.00 100% 120,500.00 100% - 0% 7 Unscheduled excavation 39.00 50 CY 1,950.00 CY 390.00 10CY 390.00 10 CY 1,560.00 40 CY 8 Unscheduled structural backfill 26.00 50 CY 1,300.00 CY 260.00 10 CY 260.00 10 CY 1,040.00 40 CY 9 Trench safety & shoring LS 119,900.00 0% 119,900.00 100% 119,900.00 100% - 0% 10 Dewatering LS 48,100.00 0% 48,100.00 100% 48,100.00 100% - 0% 11 Asphalt pavement 233.00 70 Ton 16,310.00 r27,041.98 116.06 TN 0% 27,041.98 116.06 TN (10,731.98) -66% 12 Existing Lift Station conversion LS 13,200.00 0% 0% - 0% 13,200.00 100% 13 Lift Station structural LS 39,800.00 0% 1 39,800.00 100% 39,800.00 100% - 0% 14 Electrical building structural LS 40,600.00 0% 40,600.00 100% 40,600.00 100% - 0% 15 Misty Cove Lift Station pumps & motors LS 37,800.00 0% 36,666.00 97% 36,666.00 97% 1,134.00 3% 16 Devils Elbow Lift Station pump & motor LS 24,200.00 3,388.00 14% 11 20,812.00 86% 1 24,200.00 100% - 0% 17 Mechanical LS 30,000.00 0% 1 30,000.00 100%1 30,000.00 100% - 0% 18 Electrical LS 75,300.00 ✓ 8,283.00 11% 64,758.00 86% 73,041.00 97% 2,259.00 3% 19 Finishes LS 19,700.00 0% 19,700.00 100% 19,700.00 100% - 0% 20 O&M manuals and on -site owner training LS 2,500.00 0% 0% - 0% 2,500.00 100% 21 Construction records LS 5,000.00 ,. 2,500.00 50% 0% 2,500.00 50% 2,500.00 50% 22 Change Order No. 1 LS 8,439.57 0% 8,439.57 100% 8,439.57 100% 0% 23 Change Order No. 2 LS 18,552.94 18,552.94 100% 18,552.94 100% 0% Totals $ 776,652.51 $ 61,343.92 8% $ 654,797.57 84% $ 716,141.49 92% $ 60,511.02 8% WSST 9.5% 1 5,827.67 62,205.77 68,033.44 11 Less 5% Retention (3,067.20) (32,739.88) 1 (35,807.07) Less Previous Payments (684,263.46) (684,263.46) Amount Due: $ 64,104.40 $ 0.00 $ 64,104.40 „ LAKESTDE INDUSTRIES, ING: ••- to � 1 me-li f DrVT Wfl 0WIM. +•:r t..2 Iw A �wlf�. .{, �. ' I. 1'Itir r” 1_t tt.f ¢'1In C.-UST I .Rylileri RKATIO'J`$.... „{: � r 1' . 1.., ;.(elRll.,i 3 t .+:i'd! tifj.hyrfc. I {;9 •�k'.I( , i zPI I � T.. ►u1ia••s��'� _._.............. ,._. i+13{•3 G^.' h�z', �.r �t:.. t J psi; . '{.' f?_It<;f'# ;i, IW .;€t �t�(-:1 1 �, .. •�z/ fl s'+�Ay�l�i., i 0 C L1 0i c ...:5:1 •$�:1 0' ��_� its �'' '' ��`� '�"'.... -- jj y'-Jn'{A{,i J I„IA'1= A' 'b' } J. L/ f'''t� {fit:.",1 •'I {i�,.' n .. .:Y. co A\ I: QUAl.,0PP()R,CIh\1'1'Y.EMPLOYER 13 \C'A. S'I Y ON'T. RI C # LAKESi+27;jb m° 0R.,CCB # 168542' HOT ASPHALT MATERIAL ;SAFETY DATA.SHEET-ON REVERSE LAkfE 1DE INDUSTRIES ,INC. ' G�4.1 .+.. ...Jt.. %'Slew} ft�L•�,Ritttt'rg t ro +i 1..3: � •try i'll,. i 1:"h .•..�. t�#°.F `ii�4tq$ _ _... Ti�_._�' ��e��'YbSi vi��r� _ ...... ..._ ., Y k:•i�l\„.:k�t 3 ., t ,f:;fs!•' ' l i:'t'i ,:.r t t _:k", `.} 1.•.ta.r � �('I ' .t.,l.'l=+�... t li+i` t ¢ f is ' Ix i vlltr.., ,! .t: •"1 'R'.. t "li.l 1..1•.�f.. 7 "� I i- ... .t... t3, ty ,:•r} .. '=,,ref, i t, :�;�; , r i�,; , .. ,:, , I i4 �.. • '} il,l;?;t4�. .1.,2.? ..rt...�........ . s .... ...�'uYe-�? aw.t�- j t ,:p� ; •r� l.t r'1�} }'; .r(�1 1'i;i Vt 't li�l, �?4• i it _ • >ctl�'v'�,i�aE.S6. "t- � d.,.�if�3 'T��y+R'`L�i ..�,. I! ! 2 �,;,1-,>, i 2,s(I.}. ''i•? _r{r. ..�_.. �p y !;. t.i•1 ...... .'+-• 2�<• � i'' .. � • rs. 1'f i' �. it F.'(.Y f� i r. 1 ¢-.1 ''',:- I.f:i !,a'{i r� �%*+�,����.......—... - I:..41r7 c.:i i f�� tt'•.f. " �'w7tl.I, t�r.{ AN EQUALLIOPP,ORPU\ITl'�E\(PI.OlF..R o XV,-VST,CC)\1: R1 C; #L.\f:E5h274iD o"QR. CCB>#,108�42 ?' HOT ASRHALT,MATERIAL SAFETY DATA SHEET ON REVERSE; — - •-- — —•r-- • — _--. � z_,.� �_ � �... —:�.— ---I _ ,_ �. -� ter— .�_„{ (I L hE S1.1llF SIN' _U,STiRIES, I_NC. il� � .. .•�t "\ C,. e. '.:4<, , 1'1 `7 f i-ij t 4'�1' k63}I���1'i r` lsap� .S.i rirj q l � c i ,� , tyl,. 1 .r i 1 f, 4 2 k 1, J;.Vu k .._ ......w._. ,_.... ,. T i 3&;B _5 k�6 �ii< �!tPe� T 4 _.�• !wit t i"i.t", Itt . 1,;' _ ._ •, — tit:..:., t ;l'l. 01..I A-i !I.;, y,lr l 2 €£ar.,4'ty `t vi"T��rmat'tion...w I q i ,; i.'�' . _.-.. _3/ Tip ? :.._ / 4 6 ;_ 2!d!T%~ 1`:Y -�ci :1 hQt IL,UPPURIL&II1 IiSIPLOIT.R o \\'k $T l) 7 G t =1hE51 2i4 , o c)R.,C( t3,# 108542 HOT ASPHALT'MATE '4L SAFETY DATA SHEET'ON REVERSE "' `- `+' Lt1I<ESIDE,I'N'DUS,TRTES; INC-,; f�0Y1G %h. c7 hi S .Ly—{G (_lI•: Y' I tiltt•Ic=.; " 'yq. {j.` 11 1i'i .... i_ y'?'telr+rAi, ?i`K ayt A y p �(Q .... �y g p f �a `! is �s� 1i,Y i _i Q f3'';4 _ .. tq" Yti1tR1 1 G���L• a bit iLl .i,c;j•i_ 't' y�., "tl), .{{'.' 1�i.�,f. +it:'.. •. t.'i� F .1 v;�. Ji3 .. ..1:Q.. .i t. _ '•'! �i i %t !.; ` •1 jai i< iiy?'Ga t F e $ p !`rxZc ri . . e a E? M ,. .•1 ^�t;. ��;�...'(_.,_1 i .•. 4...df aE�3,ii I �"���... �.���t'�� ��Gyy��A�gy3 y� t DATE f N _ 1 YIDS 6'fTV_Q -elf tvTE ........_.. ,1 •..,�,. , it S 11 ,:,, , �, , '•t.;' 1, t_•. � ,� � ��" �-�� ii I..(+ 1I� Ei u,vI oI,voI I`1+ K I tl t.xII I Cal L-R i3 V S9 C'ci� t.r R{ C # i \ht S1 27 tjD i (!'iI.. i08542 } HOT .ASPHAL-T MATERIAL,SAFETY;DATA SHEET ON REVERSE' S{( 1 LAKESIDE I'NDUSTRIESjNC. 3''it'.f tp:. `,a iRhr'�•k - 1 •i. t:'.f L. "�. `+r Di,:� v',i{.f°'•t)'tt 1}Icy 0�1�1 I7aS.,... �i.. i,i1 +'FI. t t r Wit • _ C'lS:s�i'•iTi� i�' ir'N�` i'�wi!f�r�;�R�k;� .......»., .. • • ... »....., .�"i�;� „�i�rx c�,,r�'i.�'� • d t;(;i I 1 ,l.+ r'a'"i'IIf:; ((I` tttnt .'t -.. t^,: e. .,. ;•,.. i. i? t1-`{ a i �"... il( '3 i : -1D '( 1 "' .'t' k't • 3u°4'�s„� F1StS'at �<s�`d'4,"?�'.ib��'f9sl?.o;,"7l('iD3._._..,..,._ 1�..... ...-... �dte4r�., �+rty;4�tY.q �', ,,,.•......_._. t• Atilt-_ W: i'• I 'Ly !. f' , :Ni 1 �t i� r. _._ �` �EQUA-I. QPPORTUNI n' 1;�%1PI Ol:TiR o WA.,S7 `•CQNT..REG # Ir\i.ESI: _74JD e W*( C_•B•# 108542 'HOT ASPHALT'MATERIAL SAFETY DATA SHEET'ON'"REVERSE Advanced Power LLC PO Box ] 3705 Mill Creek, WA 98082 Bill To Gary Harper Construction Inc 14831 223rd St SE Snohomish OVA 98296-3989 Invoice Date Invoice # 7/3/2014 25238 P.O. No. Terms Project 1319-04 Net 30 1319-Misty Cove Lir... Description Est Amt Prior Amt Prior % Curr % Total % Amount MISTY COVE LIFT STATION REPLACEMENT ELECTRICAL PANELS 21,325.00 21,027.80 98.61% 1.39% 100.00% 296.42 LIGHTFNG UNDERGROUND ELECTRICAL & 3,200.00 11,395.00 2,880.00 11,395.00 90.00% 100.00% 10.00% 0.00% 100.00% 100.00% 320.00 0.00 VAULTS PUMP STATION ELECTRICAL 31,902.00 25,521.60 80.00% 15.00% 95.00% 4,785.30 INSTRUMENTATION 4,000.00 3,200.00 80.00% 0.00% 80.00% 0.00 Credit - Electrical Vnult -964.00 100.00% 100.00% -964.00 Total $4,,t37.72 Gary Harper Construction, Inc. Pay Request No. 4 Misty Cove Lift Station ReplacemE 14831223rd St SE, Snohomish, WA 98296 05/08/14 - 06/06/14 City of Renton Project #fWWP-27-36W Ph: (360) 863-1955, Fax: (360) 863-1966 Bid No. Bid Item Unit Price Qty Amount as Bid Current Completion Amount % Previous Completion Amount % Total Completion Amount % Balance to Complete Amount % 1 Mob, demob, site prep & clean up LS 45,100.00 11,275.00 25% 22,550.00 50% 33,825.00 75% 11,275.00 25% 2 Temporary erosion & sediment control LS 1 3,700.00 370.00 10% 11 3,330.00 90% 11 3,700.00 100% - 0% 3 Traffic Control LS 1,300.00 0% 1,300.00 100% 1,300.00 100% - 0% 4 Temorary bypass pumping system LS 24,500.00 0% 0% - 0% 24,500.00 100% 5 Site work & utilities LS 78,900.00 6,312.00 8% 71,010.00 90% 77,322.00 98% 1,578.00 2% 6 Trenchless gravity sewer LS 120,500.00 0% 120,500.00 100% 120,500.00 100% - 0% 7 Unscheduled excavation 39.00 50 CY 1,950.00 CY 390.00 10CY 390.00 10 CY 1,560.00 40 CY 8 Unscheduled structural backfill 26.00 50 CY 1,300.00 CY 260.00 10 CY 260.00 10 CY 1,040.00 40 CY 9 Trench safety & shoring LS 119,900.00 2,398.00 2% 117,502.00 98% 119,900.00 100% - 0% 10 Dewatering LS 48,100.00 0% 48,100.00 100% 48,100.00 100% - 0% 11 Asphalt pavement 233.00 70 Ton 16,310.00 0% 0% - 0% 16,310.00 100% 12 Existing Lift Station conversion LS 13,200.00 000 0% - 0% 13,200.00 100% 13 Lift Station structural LS 39,800.00 0% 39,800.00 100% 39,800.00 100% - 0% 14 Electrical building structural LS 40,600.00 20,300.00 50% 20,300.00 50% 40,600.00 100% - 0% 15 Misty Cove Lift Station pumps & motors LS 37,800.00 756.00 2% 35,910.00 95% 36,666.00 97% 1,134.00 3% 16 Devils Elbow Lift Station pump & motor LS 24,200.00 0% 20,812.00 86% 20,812.00 86% 3,388.00 14% 17 Mechanical LS 30,000.00 0% 30,000.00 100% 30,000.00 100% - 0% 18 Electrical LS 75,300.00 30,873.00 41% 33,885.00 45% 64,758.00 86% 10,542.00 14% 19 Finishes LS 19,700.00 2,955.00 15% 16,745.00 85% 19,700.00 100% - 0% 20 O&M manuals and on -site owner training LS 2,500.00 0% 0% - 0% 2,500.00 100% 21 Construction records LS 5,000.00 0% 0% - 0% 5,000.00 100% 22 Change Order No. 1 LS 8,439.57 0% 8,439.57 100% 8,439.57 100% 0% Totals $ 758,099.57 $ 75,239.00 10% $ 590,833.57 78% $ 666,072.57 88% $ 92,027.00 12% WSST 9.5% 7,147.71 56,129.19 63,276.89 Less 5% Retention (3,761.95) (29,541.68) (33,303.63) Less Previous Payments (617,421.08) (617,421.08) Amount Due: $ 78,624.76 $ 0.00 $ 78,624.76 Gary Harper Construction, Inc. 14831 223rd St. SE Snohomish, WA 98296-3989 Invoice Date Invoice # 5/19/14 114-131 Terms Project Misty Cove Li£.. Item Description Amount Masonry Re: Misty Cove Lift Station 7,650.00 Renton, WA Contract Amount $7,650.00 May Progress 100% Complete ...............$7,650.00 Less 5% Retention .................................... 382.50 Total Due...............................................$7,267.50 Sales Tax 0.00 Total $7,650.00 4527 Orchard Street South • Tacoma, Washington 98466-6621 • Phone (253) 473-3997 • Fax (253) 473-0140 5/20/2014 JOHNSTON CONSTRUCTION COMPANY SCHEDULE OF VALUES DATE:! 5/20/14 1 JOB #r 510 �Misty Cove MONTH: 1 5/20/141 DESCRIPTION OF WORK AND MATERIALS TOTAL VALUE QTY OR % COMPLETE VALUE COMPLETE PREVIOUSL Y BILLED AMOUNT REQUESTED COST TO COMPLETE RETAINAGE 5% 1 CMU Building 7,650 100.00% 7,650 0 7,650 0 383 2 0,00% 0 0 0 0 0 3 0.00% 0 0 0 0 0 4 0.00% 0 0 0 0 5 0.00% 0 0 —0 0 0 6 0.00% 0 0 —0 0 0 0 0.00%1 01 01 0 0 0 Original Contract Totals 7,650 1 7,6501 01 7,650 0 382.5 CHANGE ORDERS I Change Order# I - 0.00% 0.00 0.00 0.00 0.00 0 2 Change Order# I - 0.00% 0.00 0.00 0.00 0 3 Change Order #3 - 0.00% .0.00 0.00 0.00 0.00 0.00 0 lChange order Totals 5751 0.00 0.00 0.00 0.00- 0 �TOTA70NTRACT 7,650.001 100.00%1 7,650.001 0.001 7,650.001 0.001 3E10 Page 1 Star Roofing & Construction, Inc. 16912 9th AVE SE Mill Creek, WA 98012 Bill To: Gary Harper Construction Inc. 14831 223rd ST SE Snohomish WA 98296-3989 Phone: Email: Project: Misty Cove Lift Station 5027 Ripley Lane Renton WA 98056 PO#/Job Info: Invoice Date Invoice # 6/4/14 37779 Terms Rep Quantity Item Code Description Price Each Amount Metal Roofing 24GA. CB-SL2-1750 Metal Roof for Electrical Building 4.036.00 4,036,OOT Subtotal $4,036.00 Sales Tax (0.0%) $0.00 Pmts./Credits S0.00 Phone # (425) 290-7827 Fax # (360) 568-7433 Web Site �wwv.starroofinggroup.com Balance Due $4,036.00 Advanced Power LLC PO Box 13705 Mill Creek, WA 98082 Gary Harper Construction Inc 1,1831 223rd St SE Snohomish WA 98296-3989 Invoice Date Invoice # 6/4/2014 25231 P.O. No. Terms Project 1319-03 Net 30 1319-Misty Cove Lif... Description Est Amt Prior Amt Prior % Curr % Total % Amount MISTY COVE LIFT STATION REPLACEMENT ELECTRICAL PANELS 21,325.00 21,027.80 98.61°/, 0.00% 98.61% 0.00 LIGHTING 3,200.00 90.00% 90.00% 2,880.00 UNDERGROUND ELECTRICAL & 11,395.00 . 11,395.00 100.00% 0.00% 100.00% 0.00 VAULTS PUMP STATION ELECTRICAL 31,902.00 80.00% 80.00% 25,521.60 INSTRUMENTATION 4,000.00 90.00% 80.00% 3,200.00 Total S31,601.60 WCCL Systems LLC Invoice 3407 N 24th Street Tacoma, WA 98406 253-606-4964 wcclsa stoma@ontl ookcom Phone#A 253-606A964 wcclsystems@ou t]ookcom Bill To Gary Harper Construction, Inc 14831 223rd St SE Snohomish, WA 98296-3989 360-863-1955 ,Date'. in'voice i 5/7/2014 208 I x LP:O No; rl a,T ;i �,I �,Proect Net 30 Quantity Desenpnonc , t} I r �r Rate' ' Amount Coat 48" manhole with Wasser Aero Shield for Misty Cove Lift Station/Renton, WA 0.00 0.00 Labor and Materials as bid 475.00 475.00 Thank you for your business. I Total $475.00 May 16, 2014 Public Works Department - Gregg Zimmerman, P. E., Administrator Mr. Gary Harper Gary Harper Construction, Inc. 14831 223`d Street SE Snohomish, WA 98296-3989 RE: Change Order Proposal No. 8 — Misty Cove Lift Station Replacement Request to Resubmit Dear Mr. Harper: This letter is in response to your proposed change order No. 8. The dewatering plan (designed by Jacobs Associates) that you submitted for the project showed that you were planning to use four (4) wells for dewatering purposes. The "Closure" section of the plan also stated that "Some water in the excavation may require additional sumping from inside". While installing the fourth dewatering well, your subcontractor unintentionally damaged the City's mis- located 12" diameter sanitary sewer. Due to the sewer's location, this fourth well could not be completed. Your company made the decision to work with the three successfully installed wells and not install a fourth operational well. Bid Item No, 10 (Dewatering) of the technical specifications is a lump sum price that covers all plans, material, labor and equipment for dewatering. This bid item has been paid in full for dewatering system completed. Your proposed change order no. 8 states that it cost your company extra time and money because the excavation had additional water to deal with due to the missing fourth well however, the amount of your proposed change order no. 8 appears to be based on your subcontractor's cost to install the fourth well and not on the extra time and cost that was incurred during the installation of the wetwell. You may resubmit your proposal with documentation showing the extra costs that were incurred during the installation of the wetwell for our review however, as currently submitted, the City has to reject your change order proposal No. 8. Sincef4y, 117 Jhn Hobson Wastewater Utility H:\File Sys\WWP - Waste Water\WWP-27-3627 Misty Cove Lift Station\Pay Estimates\Change Orders\Gary Harper Construction CO 8 - City of Renton Response.doc/1Had Renton City Hall • 1055 South Grady Way • Renton, Washington 98057 • rentonwa.gov GARY HARPER CONSTRUCTION INC. 14831 223rd Street SE Snohomish, WA 98296-3989 (360) 863-1955 Fax (360) 863-1966 May 12, 2014 City of Renton Attn: John Hobson 1055 S Grady Way Renton, WA 98057 Re: Misty Cove Lift Station Replacement, Project #WWP-27-3678 Change Order No. 8 Extra cost to GHC for the City's existing sewer line being mismarked. GHC had a 4th dewatering well per plans. We were not able to complete the dewatering well due to the fact that the drilling company drilled through the existing sewer line. We then had to repair the sewer line. GHC was compensated for the repair of the sewer line, but not for the loss of the well. GHC had a rented Kamatsu 450 and Slide Rail Shoring on site already when the 4th well was being drilled. We did not attempt to drill another well due to the fact that we were already behind schedule. GHC did not get compensated from the dewatering subcontractor. We also had additional water coming into our excavation from not having the 4th dewatering well which cost GHC time and money to deal with. GHC is asking for the amount Designed Groundwater has estimated money lost on the well, which is $6000.00. Gary Harper From: Steve Fors <steve@designedgroundwater.com> Sent: Wednesday, May 07, 2014 6:41 AM To: Gary Harper Subject: 4th Well at Misty Cove Gary, After reviewing the costs of the deep wells at Misty Cove I have determined that just our costs (no Labor) would be $6,000.00 (No mark up WSDOT). . If I were you I would submit this cost for the missing well to the city with WSDOT Mark up, Labor and the costs it may have caused Gary Harper Construction. Thank You Steve Fors Owner/Manager/Estimator Designed Groundwater Services, LLC (DGS) The information and data in this email may be proprietary, confidential or privileged and is intended for the sole use and benefit of the named addressee(s). You are hereby notified that any review, use, copying or dissemination of the contents of this email is strictly prohibited. If you have received this email in error please permanently delete it and destroy all copies. Thank you. Engineers/Consultants To: Steve Fors / DGS From: Frank Pita, PE, LHG 31Jan14 #JA 4222.47 RE: Limited Dewatering Hydrogeologic & Engineering Design / Plan for the Misty Cove Lift Station Replacement, Renton, Washington Background & Summary of Available Data At the request of Steve Fors, JA visited BXWA internet site to review the available contract data and was also provided project specific data from the Gary Harper contractor organization as follows: o Engineering Geology Report by RH2 Engineering, Inc. (REN 112.047.01.101); o Misty Cove Lift Station Replacement plans & specifications; and o D.P. Nicoli Slide Rail System drawings. The lift station's designed base is 34 feet below the ground surface, so the depth of the excavation will be approximately 35 feet. Boring MW-1 by RH2 is adjacent to the lift station location. The boring was advanced to a depth of 46.5 feet•below surface, and it indicates the following: u The water table in the monitoring well casing is at 9 feet below the surface. The boring indicates; o ML-CL exists from approximately 1.5 to approximately 20 feet, o ML from 20 to 25 feet, and o SM from approximately 25 feet to 46.5 feet in depth (this unit is alternating layers of silty SAND to sandy SILT). The above data indicates that the upper 25 feet of fine material will not yield much water but from 25 feet to the bottom of the excavation, groundwater requiring control is present. RH2's staff performed a limited pump test on MW-1 finding that a constant pumping rate of 2 gallons per minute (gpm) for 15 minutes would lower the static water level by 20.5 feet (29.5 feet below the surface). Through the grain size data of the SM layer, the RH2 staff concluded that the hydraulic conductivity ranged from 0.0001 to 0.001 centimeter per second (cm/sec). These values correlate with those of Freeze & Cherry, 1979 so JA agrees with these findings. Analyses / Data Evaluation In general, JA is recommending deep wells since discussions with the contractor have indicated that there will not be enough room to construct staged vacuum wells within the 1109 First Avenue, Suite 501, Seattle, Washington 98101 Phone: (206) 588.8200 Fax: (206) 588.8201 shoring box as it is being excavated. Also, because of the fine grained nature of the material, JA feels the drawdown curves will be steep so therefore several, not overly large diameter deep .wells, in close proximity, are needed to control the water in this excavation. The wells need to be below the bottom excavation by a significant amount so that the water drains to them. At this time, JA is recommending the wells be 50 feet deep and surrounding the excavation. To evaluate the spacing and depth of the deep wells, Jacobs Associates used a European developed computer program that allows the modeling of both vacuum and gravity pumping systems (please note that all units are in metric). Jacobs Associates approach is to design for the probable and reasonable high .permeability in the soil. From the geotechnical and hydrological data available, it appears that the most permeable in place soil to be dewatered is the SM unit below approximately 25 feet. The permeability (k) obtained from RH2 testing and used in our analysis will be 1 x 10-3 cm/sec. Computer Model Analysis using Deep Wells The case is for an SM beneath a 25 foot thick layer of ML material. The parameters entered are as follows: • Excavation Shoring Size is approximately 18 x 12 feet (-6 x 4 meters); • Well Spacing surrounds the shoring as shown in Figure 2 & 3 are approximately 13 by 20 feet in north/south (-4 meters by 6 meters); • Well Depth & Pump intake location = 50 feet (15 meters); • Well/hole Diameter = 18 inch auger w/ 12 inch center hole (305 mm) An 8 inch PVC casing will filter material surrounding it; • Pumping Rate per well = 40 gpm max (2.5 liters/see.) / model run at 8 gpm/well is presented in Figure 4; • Groundwater Static Level = 9 feet (3 meters); • Excavation Depth = 35 feet (10.7 meters); and • Permeability = I x 10"' m/sec for a SM. The approximate well layout is shown in Figure 2, the model layout and results are presented on Figure 3. Conclusions / Recommendations Since we have limited hydrogeologic data on the subsurface conditions, it may become apparent during the installation and early operation that some modifications could be made to the layout to improve its performance, but this is our first approach based on reasonable assumptions using the data we have available. Based on these results created by the above assumptions, it appears that the probable result is that if four wells are installed to 50 feet, it will require each well to pump at about 8 gallons per minute (gpm) to achieve drawdown. As a result, JA makes these recommendations: 1109 First Avenue, Suite 501, Seattle, Washington 98101 Phone: (206) 588.8200 Fax: (206) 588.8201 • The pumps in each well must be able to remove all the water the flows into each well, so that the level within the casing/screen is very close to the bottom. • The type of bored holes shall be with a hollow stem auger that has a 12 inch center hole for well construction. Each hole will be bored to just over 50 feet and any heave must be removed. • The casing housing the pump should be 8 inch ID PVC with machined slotted screen and solid pipe to the surface. The screen length shall be the lower 35 feet of the casing with end cap. Remaining feet is solid pipe. It should stick above the ground surface at least 2 feet. • The slot size shall be `30' slot with the most per foot as possible by the manufacturer. JA recommends Western Well Screen, Puyallup, WA ((253) 862- 4989) as a supplier & manufacturer. • Filter material will be used around the wells and shall be manufactured material such as Colorado 8x 12, Rinker #8 Concrete Sand or Glacier 8700 Sand. 1f more details are needed, please have the driller contact JA. The filter material should extend a minimum of 5 feet above the screen level. • The remainder of the annulus can be backfilled with onsite material and/or pea gravel with a bentonite seal per WAC regulations. The surface must be mounded so all water flows away from the casing. • Each well requires a submersible oil cooled pump placed to the bottom that can pump a minimum of 40 gallons per minutes (gpm) each. Electric power is required to each well though not shown. • Wells will be abandoned per the WAC regulations at the direction of a licensed water well driller. • Settlement of the none soft clay or peat soils typically does not occur unless the wells are removing large quantities of sand and silt material as they pump, which results in voids. At start up the wells will be temporarily `dirty' but they should clean up quickly if properly built. If they are pumping clean, then this issue of settlement should not be a problem. The discharge water from the wells should be monitored to be sure this is the case. • To monitor the pumped water level, JA recommends saving and using the RI-12 M W 1 which is near the excavation. The results of the modeling show that if each well is pumped at approximately 8 gpm, the water is drawn down to about the excavation depth. Note that the water is much lower at the wells. To achieve this condition, four functioning wells must be constructed properly. JA is not responsible for the contractor's work and we will not be onsite during the majority of the construction. JA does not believe the wells need to be surged or developed but they should only be pumped. Closure As a note, because of the variable nature of glacial and lake/stream deposits, each of the wells will probably pump different amounts of water. Therefore, if one pump performs better than another it does not mean that it was installed incorrectly; but that the formation's hydrologic parameters change quickly and vary horizontally and vertically. 1109 First Avenue, Suite 501; Seattle, Washington 98101 Phone: (206) 588.8200 Fax: (206) 588.8201 Also, this design is NOT a guarantee that the entire excavation will be dewatered as modeled. The design is based on limited hydrogeologic data. Some water in the excavation may require additional sumping from inside. Please contact me if you have any questions. Frank Pita, PE, PG (LHG) WA Professional Engineer (#17522) / Licensed WA Hydrogeologist (# l 170) Attachments: Figure t / RH2 Geotechnical Site Plan Figure 2 / Computer Model Plan Figure 3 / Computer Model Contour Results 1109 First Avenue, Suite 501, Seattle, Washington 98101 Phone: (206) 588.8200 Fax: (206) 588.8201 CONTRACTOR TO OECOwESiON E)3sP 6CRY1TN11FA LFT ` STATION ♦_ PROPOSED FENCE AROLI D RELOCATED Txrtsuv TY •LGARBAGE AREA SEE SAWER TC [AND[ANDNO CM FOR PROPO6F➢ENOFr 6TAt[1N ~ -1 DUALS SB-i/linw-i � 1 � 1 SB-2 \ S I � 1 1 CONNECTTOEICTf7NOKING - - — ' - - - - ' - - - - — - - — _ - �— • -� - i\1,l - 1 C0.NiYSEWER WFNRE PROM CONVERTOWINGMTV COVE CODOMMUS -.. -.�.� �� ,Y '.. aNl • � ' �' SBJ mTTnD+a ! OOIDOtfTSTATION SEE NOTE I. i 1 VALLT t i�i� tl 'I •, ` _ - - - _ _ { •- _ SLEEVE UNDER RR PROPOSED V D1 FM L - - iNo, - T - • _ — — PROPOSED ( \ •I ;( TDFORAAI' OLRSACE - — � . — ac--i ---ss 1�:� T ' { �'—'--P 1 '• 1 RELOCATION AREA -- — — —— -- ,,� CARPORT T.. PROPOSED IT HOPE au+m SEM LINE FROM E)M D°- MLOMDSDVMTOPROPOSEDORy-mmm STATION. 0O181R91 VU NORMVTAL O3NMOW DRILLING, ' { \\ I PROPOSED NOT FOR CONSTRUCTION SAAWTARYE ; \ LEGEND P -o— 19OOD FENCE 1 -.-- Ct1AKM FENCE SLI Mom FIGURE 1 - GEOLOGIC EXPLORATION PLAN \ — ca" \ - -- COIISTRtNC110MPIarE - CONSTFIrnoN Lim 1• • A \ — — COR LOOSOR NAY B/lE3 LSRIKT , I� DFOSEDLr STATION SRE (1� PROPOSED LIFT STATION SITE DOMMOLMIM LAND TE1101D TO RE RE EXISTING CITY UFT STATION KEY CONSTRUCTION NOTES NOT FOR CONSTRUCTION • FOR GEOLOGIC EXPLORATION MAP ONLY cTrao wo LFT STATION PRIVATE ORFAWAY I i Figure 2: System Layout for Model (Units are in metric. Shown are 12" wells around receiving PS excavation. Wells are 50 feet deep and approximately 3 feet away from shoring support system.) 4 3 .70 (� Grey area is excavation that is approximately IS x 12 feet by 35 feet deep. Wells are 3 a feet outside shoring on long Q O side. r I 0.00 5.00 -0.00 Figure 3: Results / Contours are in metric (the bottom is at 35 ft (10.7 m) and the water level is at equilibrium when each well ends up pumping at 8 gpm in a steady state condition. The contour below the bottom is several feet below the excavation bottom. 0 0 d N 0 0 0.00 5.00 -0.00 10.00 10.7 meters = 35 feet or bottom. Each well is pumped to approx. 40 feet below surface in the model. 1109 First Avenue, Suite 501, Seattle, Washington 98101 Phone: (206) 588.8200 Fax: (206) 588.8201 Gary Harper Construction, Inc. Pay Request No. 3 Misty Cove Lift Station Replacemen"06 14831 223rd St SE, Snohomish, WA 98296 04/07/14 - 05/07/14 City of Renton Project #WWP-27-36)f Ph: (360) 863-1955, Fax: (360) 863-1966 Bid No. Bid Item Unit Price Qty Amount as Bid Current Completion Amount % Previous Completion Amount % Total Completion Amount % Balance to Complete Amount % 1 Mob, demob, site prep & clean up LS 45,100.00 0% 22,550.00 50% 22,550.00 50% 22,550.00 50% 2 Temporary erosion & sediment control LS 3,700.00 555.00 15% 11 2,775.00 75% 3,330.00 90% 11 370.00 10% 3 Traffic Control LS 1,300.00 0% 1,300.00 100% 1,300.00 100% - 0% 4 Temorary bypass pumping system LS 24,500.00 0% 0% - 0% 24,500.00 100% 5 Site work & utilities LS 78,900.00 7,890.00 10% 63,120.00 80% 71,010.00 90% 7,890.00 10% 6 Trenchless gravity sewer LS 120,500.00 0% 120,500.00 100% 120,500.00 100% - 0% 7 Unscheduled excavation 39.00 50 CY 1,950.00 10 CY 390.00 10CY 390.00 10 CY 1,560.00 40 CY 8 Unscheduled structural backfill 26.00 50 CY 1,300.00 10 CY 260.00 10 CY 260.00 10 CY 1,040.00 40 CY 9 Trench safety & shoring LS 119,900.00 3,597.00 3% 113,905.00 95% 117,502.00 98% 2,398.00 2% 10 Dewatering LS 48,100.00 2,886.00 6% 45,214.00 94% 48,100.00 100% - 0% 11 Asphalt pavement 233.00 70 Ton 16,310.00 0% 0% - 0% 16,310.00 100% 12 Existing Lift Station conversion LS 13,200.00 0% 0% - 0% 13,200.00 100% 13 Lift Station structural LS 1 39,800.00 39,800.00 100% 0% 39,800.00 100% - 00 14 Electrical building structural LS 40,600.00 20,300.00 50% 0% 20,300.00 50% 20,300.00 50% 15 Misty Cove Lift Station pumps & motors LS 37,800.00 11,718.00 31% 24,192.00 64% 35,910.00 95% 1,890.00 5% 16 Devils Elbow Lift Station pump & motor LS 24,200.00 0% 20,812.00 86% 20,812.00 86% 1 3,388.00 14% 17 Mechanical LS 30,000.00 27,300.00 91% 2,700.00 9% 30,000.00 100% - 0% 18 Electrical LS 75,300.00 30,398.61 40,37% 3,765.00 5% 34,163.61 45% 41,136.39 55% 19 Finishes LS 19,700.00 16,745.00 85% 0% 16,745.00 85% 2,955.00 15% 20 0&M manuals and on -site owner training LS 2,500.00 0% 0% 1 - 0% 2,500.00 100% 21 Construction records LS 5,000.00 0% 0% - 0% 5,000.00 100% 22-25 Change Order No. 1 LS 8,439.57 8,439.57 100% 0% 8,439.57 100% 0% Totals $ 758,099.57 $ 169,629.18 22% $ 421,483.00 56% $ 591,112.18 78% $166,987.39 22% WSST 9.5% 16,114.77 40,040.89 56,155.66 Less 59'o Retention (8,481.46) (21,074.15) (29,555.61) Less Previous Payments 1 (440,449.74) (440,449.74) Amount Due: $ 177,262.49 $ 177,262.49 IWO T Designed Groundwater Services, LLC PO Box 366, Puyallup, WA 98371 Phone 253.682-7330 Fax 253.841.2013 JamieJamie@designedgroundwater.com GARY HARPER CONSTRUCTION, INC 14831 222rd ST SE SNOHOMISH, WA 98296 P. INVOICE 'A I N 4. 1 .03 J Invoice o t 0 Date: April22, 2014vo' PROJECT PAYMENT .CONTRACT NUMBER PROJECT NAME TERMS: NUMBER Misty Cove Lift Contract 14-01 Station Terms WWP-27-3678 .DESCRIPTIONS CONTRACT AMOUNT CONTRACT gUpNjTy - -UNR.PRICE - UM COMPLETED T6 DATE INVOKED TO ' DATE TOTAL'% INVOICED PRIOR QUANITY .PRIOR AMOUNT PRIOR%' CURRENT' 'QUARRY. I CURRENT%. CURRENT AMOUNT DEWATERING SYSTEM $44,615.00 1 $44,615.00 LS 1 $44,615.00 100.00% 0.95 $42,394.75 95.00% 0.05 5.00% $2,230.75 TOTALS $44,615.00 $44,615.00 $42,384.25 SUBTOTAL Non -Taxable • TOTAL $2,230.75 50.00 $2,230.75 Page 1 of 1 IQ1!!®9Ce WitlQ (Uli��!1;4�,5."lur �� .i Yp �YIryy�4ary_. Invoice Number: 75897 Whitney Equipment Co. Invoice Date: 04/25/14 Accounts Receivable � Sales Order Number: 41072 21222 30th Drive SE Order Date: 01/02/14 Sales Person: Ben Scrace Bothell WA 98021 Suite 11DI J Customer Number: GHC United States Bill To: Gary Harper Construction Inc Ship To: Misty Cove LS j 14831 223rd St SE Gary Harper Construction / Snohomish WA 98296-3989 5027 Ripley Lane N United States Renton Wa 98056 United States P.O. Number F.O.B. Terms: 237-01 Origin Net 30 Days i +I Shipment Details Ship Date Carrier Tracking # 03/06/14 OCEAN-Ocean/Ground 03/06/14 OCEAN-Ocean/Ground 03/06/14 OCEAN-Ocean/Ground 03/26/14 OCEAN-Ocean/Ground 03/26/14 OCEAN-Ocean/Ground 03/26/14 OCEAN-Ocean/Ground 03/26/14 OCEAN-Ocean/Ground 0326/14 OCEAN-Ocean/Ground 03/26/14 OCEAN-Ocean/Ground 0326114 OCEAN-Ocean/Ground 0326/14 OCEAN-Ocean/Ground 04/23/14 OCEAN-Ocean/Ground 1Z9492500356575893 0425/14 OCEAN-Ocean/Ground 04/25/14 OCEAN-Ocean/Ground Item Number Item Description UOM Shipped Unit Price Ext. Price 1400000407129 MINI-CASII/FUS EA 3.00 _ 12024VAC,24VDC Notes: Serial $/Lot Iniortnation. 6200900 GRIP EYE UNIT EA 1.00 Notes, Serial #/Lot Wonnation. U4C EAA FA 2" Upper Guide Bar EA 2.00 _ Bracket 304SS D, Notes: Serial #lLot fnlortnalion. Page: 1 of 4 / Q 0 � Advanced Power LLC PO Box 13705 Mill Creel-, WA 98082 Bill To Gary Harper Construction Inc 14831 223rd St SE Snohomisli WA 98296-3989 Invoice Date Invoice # 5/1/2014 25216 P.O. No. Terms Project 1319-02 Net 30 1319-Misty Cove Lif... Description Est Aml Prior Amt Prior % Curr % Total % Amount MISTY COVE LIFT STATION REPLACEMENT ELECTRICAL PANELS 21,325.00 3,427.50 16.07% 82.53% 98.61% 17,600.30 LIGHTING 3,200.00 0.00% 0.00% 0.00 UNDERGROUND ELECTRICAL & 11,395.00 100.00% 100.00% 11,395.00 VAUL'rS PUMP STATION ELECTRICAL 31,902.00 0.00% 0.00% 0.00 INSTRUMENTATION 4,000.00 0.00% 0.00% 0.00 n 6�. Total y0 �� $28,995.30 REMIT TO: w� P.O. Box 418759 NE • s & ! ; • platt.com Boston, MA 02241-8759 Stiemants ' 11 INVOICE # E132315 INVOICE DAT 4/1 / '•,9 WtAE2"r'•'. 002 Seattle (206)624-4083 mgr02@platt.com r 11 .-. r �M . . . . . •o 3/17/14 I 4/10/14 I Direct I ( 1319 SOLD TO SHIP TO _ Advanced Power LLC ,a[-a10.1/0-167 [LQ� 5027 Ripley Ln N Advanced Power LLC �� Renton, WA 98296 PO BOX 13705 MILL CREEK WA 98082-1705 (11 I�11�1"Itllll�t1��111111��"IIt'�1111111�1'�1�1i11�"�I11'i�l'I) lJ � �c� ORDERED BY: LOREN PAGE 1 1� 0 1 ' C-H LOT POWER & LIGHT 12513.0000! EA 165371 ! I 1-FREEDOM MCC 1-DT363UGK ! 1-WNHFD3125L i 1: 1 ; 0 C-H PARTIAL LOT REL. 2- P&L ;3005.0000; EA CONSISTING OF: i j 158940 r .Rebate Full phone support 7 days/week 4a - 8p!PT 5a - 9p MT Every single day Pay Online / Invoices & Statements 24/7 www.platt.com j i SUB T6 fAL PF $3,005.00 - OTHER ' Gd1 YY1 rgelbOn�Wb:]O peilrr�wlClAra W.tiYc.tlonYPAa.sw�Ni+ b61rr AR.tl1 _ __._ .. .. _� .r.w.p..p.m.oedgvwmnmewa..n...w.�.aP.�.enbrgr.tl�arb.ad CHARGES bYre�.Ilvim rt/pCdMaat,ld7rryralnoe mr.Yren Yt YtNbbrsb.rdGrtl OgANr•a •. .. ••. ••• •...•• '. ..-"'-- 1b arp •tl V W W b rpah.w�7 wv1 m pvn� W.rd�MtvYOtl�P^Mlr.ah. Mak�rv.7w. irw .®iv[ �w.Mpm..umwtl b uanp. wne. �b r1w6e/,I�e1 i.rt' d tlb.�t ai.n�. re. MOVE WA" TH[ 3[WUfA0W#rAQU F7[0 "Pt Sail A PAR01[11100R1 OUi uOT 4YlEa 70 TIK MOVED W VIIWRRL a YF71DwRA01L(IY AIM Rf11ESII011 pAMK7LLM PUlllgs[ [)MRWI:E EIIDIILRSlt W[CR[a NEIIWL pW fbat WtO1'�^�• tv�•N wntlmiir..(�tlbbJP_V_.b[Wff" wWW w-W10-� rMmtlwba mbAm>s.l .ro7.n�vtrI1 ap100LEhlCibfttlr.tWMa.Fmenia�Wn"btl I.m.tYm lln4.cwwbdMrbndnw10w/ndboMa on15fnD toShe Available UWroquaeIWMWM ..o.T�rots.trInom4ueustllA.dcrw{,i►utlt&da trmumrde.u. pon OVER 100 BRANCHES THROUGHOUT THE WEST 000DOGGOD01D9505 000110 00011 OD02 0 0 0 0 0 I I � � 3,005.00 IN. j 0 0.00 3,005.00 1oz-1110-11D-167 P.O. Box 418759 NE UInv Boston, MA 02241-8759 INVOICE # E109137 INVOICE DATE 472040 Renton (425)228-7506 mgr40@piatt.com DATE ORDERED)DATESHIP,PED '$HIF?PED VIA, 4BILL? OFaLi4DING� F :CUS I'QMER PO#,`_F ,' SOLD TO 1Dz-#10-123-196 Advanced Power LLC PO BOX 13705 MILL CREEK WA 98082-1705 I NEMA1 i 016767 s Rebate ' i 1 Full phoie support 7 days/week ' 4a - 8p;PT 5a - 9p MT Every single day j Pay Online Invoices & Statements 24/7 www.platt.com i j i SU8 TOTAL SHIP TO — Customer Pickup I_$837.55 GTHER GrN-Pra.abr..r amd 7DDTMr.nrn�rsrr..ac.0- p.aM bj-ow a4efad CHARGES I w. arp.a d m.wwbr Pnbttllef aft frYn.n�w r�off o+mfe� e:.ef W w bfilb weiu tl IWcw'IST nfNRfl�AYlildR�n oy.�fne�ram.Al ol}AYf NLKib gpatiM Wlen�MR ..- .. ' /ba�C1Ab Yrt�E b DsW bM�duaW vpnrm�hnrlOf off Wly Epp, w/6f n�01. Ynotl M1n4/RWt faaaY�j�fb.NQodL Na�br b afn+Tmlf+Ify'nE b+t�W+Iwm 1oW d VbsL1O TO T M W ert-na.1.f61NE11EANENOW.WMIIDE! Fi<PDFxFD OD nWUFD v0.lyOvq DIIT I/DT WDTED TD 111E lulgTFD WYUIYrt�SOs11E11PWRAMlT7 AIgIR11Fm DII •PMTGNt1 PIIRPWE °tNF[DW158 QPIIFBYT 6PCT9REDNEDFRl NN [Yoie lffry W 4iVf1m +T �wPd b W4fMpCf1 bb n,rM v f•orp � b qfm� YyrC�P9.716 f1a10� b rdf tit f�f M1wfO/ b rT MO�OMba Mrtwbafeet M./�afrflorfrwilf I FYI-� w.ef.�.f urf l'ut 6a.t:WrMYtYb.�Or.Nara�w.v�lev�.WbN waaru`V audfr w.do�riw.er. 00d°s Wlw�Nn` i.n�e -��X TN�fnoWntr MID erfD elelTat. heets Avo�l1W. Up°e Haquosl� M� nimumRrrd! e'oddnp Chf+p►nn Aeeapl�p R. m+. OVER 1RANCHES THROUGHOUTTHE WEST OD000000D0110000000123 0001 0002 0 0 0 0 0 /1(1-� 9 PAGE 1 r837.55 j taz-pt0- 123- 196 REMIT TO: ��V1 P.O. Box 418759 N wvolces & platt.com Boston, MA 02241-8759 ; Statements ' INVOICE # E21PH6J platLcom INVOICE DATE( 4130/14 oNL�KE�drt' 002 Seattle (206)624-4083 mgr02@platt.com f 3/17/14 I 4/28/14 , Direct L I 1319 SOLD TO SHIP TO Advanced Power LLC ,a:-alo-ea-ten 5027 Ripley Ln N Advanced Power LLC Renton, WA 98296 MI BOX 13705 REEK WA 98082-1705 A �� 10 II"�I11[l�llll�lll�llitl�l��l�'Illlllll�ll�lfllll�nl�►�I,I11��1 ORDERED BY: LOREN 165371 1-FREEDOM MCC 1-DT363UGK 1-WNHFD3125L Rebate Full phone support 7 days/week 4a - 8p PT 5a - 9p 14T Every single day Pay Online / Invoices & Statements 24/7 www.platt.com SUa TOTAL $12.513.00 OTHER 6imuri Wjitlbbpv rn: a DM M Mb�earr ra w�. uetl e.D+a.m.7. rdf+db QYi v A a.ea CHARGES I .r.drq.�..o.�omeirres<wua..muwuely.emnlrmsmarwwriwq�wb.mnod �.+a.+Ae a r.. p.b.ar.70 �,. a Mu{p.lb.oel:. usu.. w rtjsib aa..rduw D.an+rc Ib Pvllilb bulb �m ndrrCwCp1 W IraWbi W.ME<W D� mg0v evh. b1t►7plleM vial mr,ry rin.4pebNdaiw b Vsrpi vul0f IipvlvO bpi cLuavao Kull d toot W mw+v a b Mwd witial TNERE ADE NDNAnM/1DlS FaMf95EDOOtIM1JED NUMPUIMNOTM7rffl roMC YWI[D WAIMW7N1i8OF iR,ipyVlTAy(iry AND iIiNES7 Ofl A 1'iA11C{MD RIIIPD:I( ahIWMF'! [7fM1E5'AY OPEOfHa IIEIi[7( Rm ELRCHUdI W. doW— rDlMp[ibdJeiiiOmlirbn,W MvttAbPtlbRw r°!bldl Eles 71{i vlr.btiMY vvl4dM�vwOib r'INOiM1isL MwM orw b14a...ip mrMu, 1S !' bne wrYYY A.eOb[H.ppi e.W4b MDIWnNnq�ddrp4Alfmrb[biv�,etYWOW tlM dvdpay ru�nrr. 61s1JOedv. WtwbllbtBdjEb x hn.n hlgb8ni►vt.8bu}op.r.�. WIMRtl1VlnCNlv4 Rq F1,mC Wyy. HI�rYTY�.. Yd CamlmmR.vWWnuCho eonAJiritslRatLit. ��/� 'MelartDl Safety f)DiD Sheeh AvDllD61D Upon Wrilfen RDquael Mtnlmum Re.taddnp Ghslya on Accaptud Ralum.. hit Eua 1 TLimr%i ir%Llr%t vT Ti Er fA/f•'i+T PAGE 1 12,513.00 REMIT TO: Uff P.O. Box 418759 JAEVA : lnvo�ce5 & platt.com Boston, MA 02241.8759 ; gtatemants P1atl.cotn • .ONLINE 24n• . 3/24114 I 4128/14 SOLI) TO laz-#10-9e- 187 Advanced Power LLC PO BOX 13705 MILL CREEK WA 98082-1705 INVOICE # B9 INVOICE DA7 4/30114 002 Seattle (206)624-4083 mgr02@platt.com Direct I 1319 SHIP TO Advanced Power LLC 5027 Ripley Ln N Renton, WA 98296 Mp, o I TO PAGE 1 165371 TO INSTALL SPO IN MCC Rebate Full phone support 7 days/week 4a • 8p PT 5a - 9p 14T Every single day Pay Online / Invoices & statements 24/7 www.platt.com SUB TOTAL $1,244.75 0.00 OTHER G.AlAlln •�A�aM1b M• I�nCb en n.l. NY.YaYaY ••o..va1.YYOIIb Pq phy AY,• tl b ow e A OYq ..q tlay.reY au.eu.aM P.nme nm q tn•im.h,wetl• ••bp frnvblM�.gNb/ b ttpl.abtnbA•. tl CHARGES Irrcw..kYY•mlMr•a..�ae.,.tln nprl b•aoaa: �u enw r•ny.tlbbawrdrmla.lre.wf. Iba•W W a• Yuan b�aL IwnYQ •eoaAu prmg4ntN • I4dL'QtlY.O• � � C1.244.75 I.YTO•a•tl..YM1tI nnern.n �^'PMM IM•Y Rrm AI MY b Yol,p, wlY..Ps.d bm•tlbYpm.�•bltl tl;nYll atYr1.Y. as W Y MrInOl.tlr•d TIIFJKAIni IR7 WAnnY(T1Ey EIPIK..S4'q 011 aW E0 eA3U0.O d!r 19T UgIfEOTOT.E UWUEO WAnnNRMS Cr uEm] W(TAGV"A40 FMAM CAR A PMTOAAn MM03I On1En"SE EMEMUY monw HMOs, Fw Bank 5�qy wN dfpem .ql MiYtlb bYAnp�Yb1.IW'01•RWptlYgR YY rd.0�.1ti11h.10.b•WptlYWAY•IgN.a,bY>♦YellWhtawM•IbtsYYS bM1 Y•lol•/t•a•.Y.a..OEM tibnNrO• IAsIM �bd1YC�C�W.71.1E4vta�.LvT—rdCiOdAN//w•btl•tl1O6.M�w0Y1mm\•n1sL.eYM[. btnterlal BofeIy Sheets Available nta Upon W hr Requasl Mlntmum Rnlocf,lno 6harpa on Accopbd Ratume. M 11=0 inn Or.A AI/lLlr- • '•.-..—...-....� WCCL Systems LLC Invoice MW N 24t6 Street TQCOma, WA 98406 253-6W-4964 weclsustemeC@outlookcom Phoao # 253-6W-4964 Gary Harper. Construction, Inc 14831223rd St SE Snohomish, WA 98296-3989 360-863-1955 wcclsystema@outlookcom Date, Iiv"oice A 4/24/2014 202 P:OtiNo; iTer_'m's Protect' Misty Cove Net30 Quantity C�esciiption Rate ; Aniourit Line Wet Well with Raven 405 as Bid / Repair Leaks in Wet Well Line 72" wetwell as bid / work completed 4/25/14 15,879.00/ 15,879.00 'plank you for your business. Total $15,879.00 t Denis Law Mayor NJ of Public Works Department -Gregg Zimmerman, P. E.,Administrator April.10, 2014 Mr. Gary Harper Gary Harper Construction, Inc. 14831 223rd Street SE Snohomish, WA 98296-3989 RE: Change Order Proposal No. 6 . Dear Mr. Harper: The City of Renton is rejecting your Change Order Proposal No. 6 based on the following reasons: 1. Your letter states that "unknown ground conditions" is the reason for this claim. The design depth of the wetwell, as shown on the project plans, is 30 feet. The "Engineering Geology Report" for this project, as contained in the project specifications, details the soil types and their corresponding depths to a total depth of 45 below the ground surface at.the location of the wetwell. Your request has not shown how the ground conditions differed from those as detailed in the soils report. 2. The subgrade depth and foundation limits were directed by the City's consultant and inspector. Per the specifications, the additional 2-foot depth of excavation and corresponding backfill is covered under bid items no. 7 (Unscheduled Excavation) and no. 8 (Unscheduled Structural Backfill) respectively and has been authorized for payment.in pay estimate no. 2. Sincerely,, ohn Hobson Wastewater Utility H:\File Sys\WWP - WasteWater\WWP-27-3627 Misty Cove Lift Station\Pay Estimates\Change Orders\Gary Harper Construction CO 6 - City of Renton Response.doc/JHad Renton City Hall • 1055 South Grady Way • Renton, Washington 98057 • rentonwa.gov G.ARY HARPER CONSTRUCTION INC. 14831 223rd Street SE Snohomish, WA 98296-3989 (360) 863-1955 Fax (360) 863-1966 April 7, 2014 City of Renton Attn: John Hobson 1055 S Grady Way Renton, WA 98057 Re: Misty Cove Lift Station Replacement, Project #WWP-27-3678 Change Order Proposal No. 6 Reason for change order is unknown ground conditions. Soils were extremely tight and would not allow water to penetrate into dewatering wells. It was also not possible to use a vacuum system inside of shoring because of the water and mud inside of shoring. We were informed by Designed Ground Water Services that a vacuum system wouldn't have worked either way in these soils. The only solution was to dig to a depth of 2' deeper than the plans called out, vactor out mud and water, install geo fabric and quarry spalls. The only charge we are asking for is the Vactor truck costs. Services Davidson-Macri Sweeping, Inc. 1,947.19 Overhead & Profit 21% 408.91 Total Change Order Proposal No. 6 $ 2,356.10 John D. Hobson From: Steve Nelson <snelson@rh2.com> Sent: Tuesday, March 18, 2014 9:10 AM To: John D. Hobson; David Baisch; Steven Pinkham Cc: Mark Miller Subject: RE: Misty Cove LS - Wet well subgrade Andrew called a few minutes ago to sat that their excavator needs servicing, and will make repairs today and reschedule the work for tomorrow. They will probably set the manhole box in place today. Steve From: John D. Hobson jmailto:JhobsonCcORentonwa.gov] Sent: Tuesday, March 18, 2014 6:15 AM To: David Baisch; Steven Pinkham Cc: Steve Nelson; Mark Miller; Gary Harper<ga!y(&garyharperconst.com> (gaU(&garyharperconst.com) Subject: RE: Misty Cove LS - Wet well subgrade Thanks David. From: David Baisch [mailto:dbaisch(aarh2.com] Sent: Monday, March 17, 2014 3:31 PM To: John D. Hobson; Steven Pinkham Cc: Steve Nelson; Mark Miller; Gary Harper <gar�a gar ryharperconst.com> (gaUPgaryharperconst.com) Subject: Misty Cove LS - Wet well subgrade John, Steve Nelson and I called Andrew Evans and discussed GHC's approach for the wet well subgrade excavation, dewatering, and backfill. GHC is planning on over -excavating 2 feet below the wet well, the dewatering sub determined more well points will not be very effective in further dewatering the excavation, instead they will have a vactor truck onsite to suck up the water/mud as needed during excavation. Steve Nelson will be onsite to inspect the subgrade tomorrow around noon and coordinate with Andrew. GHC will then install soil fabric, 1.5' of 4-8" quarry spalls, and then 6" of 2-4" quarry spalls, set the wet well base and begin backfilling up to the gravity sewer pipe invert elevation. They are also going to take an elevation shot inside of the wet well base after it is set so they can track if it is settling or moving before fully backfilling/removing the shoring. Steve and I confirmed with Andrew that this is a good approach. Thanks, David Baisch I RH2 Engineering, Inc. Staff Engineer 22722 29th Drive SE, Suite 210 Bothell, WA 98021 P: 425,951.5426 C: 206,697.2584 www.rh2.com DAILY INSPECTION DIARY 0 REPORT �t DAY: k4Q12DATE:. / WORK PERIOD: a.m./p.m. to a.m./p.m. WEATHER TEMP. MAXOF MIN°F PRECIPITATION.: WORK ACCOMPLISHED TODAY: CONTRACTOR SIGNATURE DATE: If SIGNATURE Davidson -Maori Sweeping, Inc. 12020 SE 32nd Street i Suite 4 Bellevue WA 98005-4121 425-289-1145 425-289-1146 fax Billed To: G°Hc Invoice Invoice#: 148026 Date: 0312112014 Project: Misty Cove Lift Station 5021 Ripley Lane North Renton WA Terms: 30DY Due Date: 0412012014 Customer P4 #: 14-01 Customer Job#• Ticket# Service Date Description Quantity Price Ext Price Taxable 11601 03/18/14 Vactor Service 2.25 219.00 492.75 Y dewatering 11601 03/19/14 Vactor Service 5.50 219.00 1,204.50 Y dewatering Decant Fee 1.00 81.00 81.00 Y A service charge of 18,00% per annum will be charged on all amounts overdue on regular statement datea Thank you for your prompt payment! Non -Taxable Amount: 0.00 Taxable Amount: 1,778.25 Sales Tax: 168.94 Amount Due 1,947.19 Ticket No. or ,,,avidson-Mac Sweepin., Inc. 11601 12020 SE 32nd St. Suite 4, Bellevue, WA98005-4121 Phone: 425-289-1145 or866-45-SWEEP Fax.:426-289-1146 r Ain c & Vid !y (C)(OW 6 Name f lCotinipan� Name A) �311 Date 3 �/_/LY_Time Billing Address . - (j 00 �7/ JobAddress 6-0.2-/ PIP6641e, Phone X, Contact M , Ordered by: Phone Job Location I Driving Directions: TV Truck New Construd(loh Exisfin, 'Systern F1 Zaln'� '13 v 9 Wage r Dump Site Locatior 0.6 IT, ra prppn Ins'tru6ti6iris Gomments ,�abor br Per our Per Hour H Job Charge Per Hour Travel D6mp Fees: Approx Quanity �argie Travel Start: Z3 e? —Job Start:- Job Stop: %/• Travel Stop: Date..37,14"/ Vehicle No: Driver Operator Laborer Vehicle No: start: Stop: �15 Tel StartJob Start rav,_ Datej;/`. / : Vehicle No: Driver Operator. Laborer —start _—stov 31 —Vehicle No: Date: Accepted BYWr Date: Accepted By, King County Roads Maintenance Scale System Ticket: R55952 Scale: Renton Date; 03/19/2014 Card: 100228 Org: DAVIDSON-MACRI SWEEP Truck: 1FVXFZYS7YLF06956 Driver; PLUMLEE Mat'l: Storm Liquids Source; Other Address: 5021 RIPPLEY LANE NORTH RENTON In Wgt; 45420 Lbs 02:06PM Out Wgt: 45420 Lbs 02:06PH Net Wgt: 0 Lbs or 0,00 Tons Entry Fee; $ 61.00 Load Fee; $ 0.00 Total Fee: $ 81.00 Thank You! 4376720 _ FORM C-700(SL) 16 18-2013) U.S. DEPARTMENT OF COMMERCE Economic and Statistics Administration U.S. CENSUS BUREAU CONSTRUCTION PROJECT REPORT STATE AND LOCAL GOVERNMENTS IMPORTANT Please refer to the Reporting Instructions on the back of the form. DUE DATE: APR 19, 2014 U.S. Census Bureau 1201 East 10th Street Jeffersonville, IN 47132-0001 1-800-845-8245 www.census.gov/econhelp/cprs u)vib ivo. ubui-u 156: Hpprovai txpires ub/s ilzu ib In any correspondence pertaining to this report, refer to the control number shown below. DATE SV S WGT TC NEWTC ST NEWAA STATUS 201312 821 18.91 76 1317 53 3 1 4376720 1 0501424 L2 CITY OF RENTON UTILITY SERVICES ATTN JOHN HOBSON PROJECT MGR WASTEWATER UTILITY ENGINEER ` 1055 S GRADY WAY - 5TH FLR D .(1`� (/9 057 RENTON WA Use your unique User ID and original password. FAX (425) 430-7241 PHONE (425) 430-7279 � User ID: 0501424 Password: Rmri# 14 ## (Please correct any error in name and address including ZIP Code, telephone and fax number) PROJECT IDENTIFICATION . r SQUARE FEET The construction project described below is associated with your 7. Based on exterior dimensions, how many square organization according to published sources. Please correct any errors or feet of enclosed floor area (including basements) fill in any blanks in items 1 and 2. If necessary, make your corrections in will be created by this project? item 10, Remarks, or use a separate sheet. IF YOU HAVE ANY QUESTIONS CONCERNING THIS FORM, PLEASE CALL 1-800-845-8246. Exclude nonbuilding projects 1. PROJECT DESCRIPTION and existing floor space Square feet MISTY COVE LIFT STATION REPLACEMENT that is being remodeled. CAG13178 If none, enter "0." MONTHLY CONSTRUCTION CAG13178 PROGRESS REPORT 2. PROJECT LOCATION 5021 RIPLEY LN N RENTON WA • Continue with item 8 if project has started; otherwise, skip to section F. • Report the value of construction put in place each month. Include only those construction costs defined in item 5c. DO NOT include costs reported in item 6. • Report costs in the month in which work was done (including any monthly retainage being withheld from contractors) rather than in the month in which OWNERSHIP AND START DATE 3. TYPE OF OWNERSHIP -Mark (X) one box. Is this project ❑ State Government or Agency payment was made. ❑ Privately -owned OR Owned by: ❑ Federal Government or Agency • When project is completed, enter month and year in item 9. 8. WiONTHLY VALUE OF CONSTRUCTION PUT IN 7-1 Local Government or Agency PLACE ON PROJECT DESCRIBED IN ITEM 1 4. START DATE OF CONSTRUCTION Month and year of actual Month and year report period (a) Value of construction put in place during month as defined in item 5c (Thousands of dollars) (b) When did actual construction work on the site start, or when do you estimate it will Y start? Enter month and year. or expected start date FEB 2 014 COST ESTIMATES INCLUDE . Site preparation and outside construction such as sidewalks and roadways MAR 2014 $ Z g ,000.00 • Mechanical and electrical installations which are integral parts of the structure, such as elevators, heating equipment, etc. FEB 2014 $ 271 000.00 EXCLUDE • Land and pre-existing structures • Architectural, engineering, and owner's overhead and miscellaneous costs - See item 6 $ 000.00 $ '000.00 • Furniture, furnishings, and other movable equipment • Contingency funds FOR HEAVY NONBUILDING PROJECTS $ '000.00 SEE SPECIAL INSTRUCTIONS ON BACK $ '000.00 NOTE: If project is on a "cost plus" basis, enter your best estimate of the final cost. $ '000.00 5a. CONTRACT CONSTRUCTION COST (Amounts to be paid to contractors and Construction costs (Thousands of dollars) $ 821 ,000.00 subcontractors) $ '000.00 $ '000.00 5b.OWNER SUPPLIED MATERIALS AND LABOR (Construction materials supplied by owner and the value of work done by project owner's own construction employees assigned to the project.) $ '000.00 $ '000.00 $ 000.00 5c. TOTAL CONSTRUCTION COST (Surn of 5a + 5b) 821 $ '000.00 $ 000.00 6. ARCHITECTURAL, ENGINEERING, AND MISCELLANEOUS COSTS - If book figures are not available, reasonable estimates are acceptable. INCLUDE . All fees for architectural and engineering services. If contractor was authorized to "design and construct" this project, such cost should be included in item 5a. $ '000.00 • Cost of design work by owner's staff If construction is complete except for some minor work • Project owner's overhead and office costs . Fees and other miscellaneous costs allocated on owner's books to this project or retainage (up to 3 percent of item 50, you may stop reporting on this project by entering the completion date in item 9 and indicating any remarks in item 10. EXCLUDE •Cost of movable machinery and Architectural, engineering, equipment, land, and furniture and and miscellaneous costs furnishings (Thousands of dollars) 9. COMPLETION DATE Enter date when all Month and year of completion • All interest to be paid directly by State or local governments $ 156 ,000.00 construction is actually completed NOTE: Be sure to complete section F on the back of the form. REPORTING INSTRUCTIONS FOR STATE AND LOCAL CONSTRUCTION PROJECTS ► Section A - PROJECT IDENTIFICATION Correct any information in items 1 and 2 if necessary For the project described in item 1 to be government owned, it must be State or local government owned during construction and involve the erection of a new structure(s) or improvements to an existing structure(s) as defined below. For the project described in item 1 to be privately owned, it must be privately owned during construction and involve the erection of a new structure(s) or improvements to an existing structure(s) as defined below. If the project is only maintenance and repairs, please note so in item 10, Remarks, complete item 11, and return the form. ► Section B — OWNERSHIP AND START DATE Item 3 —As noted, "ownership" for purposes of this survey, depends on the owner during the construction phase. Check the appropriate box. Item 4 — The start date is defined as the date that actual construction work first began on the project described in item 1. If the project is to start at some future date, please enter the date, complete item 11, and return the form. ► Section C — COST ESTIMATES "Construction," for purposes of this survey, is defined as the building of and/or improvements to fixed structures. This INCLUDES: a. New structures, additions, alterations, conversions, expansions, rebuilding, reconstruction, renovations, rehabilitations and major replacements (such as the complete replacement of a roof or heating system). b. Mechanical and electrical installations — Plumbing, heating, electrical work, elevators, escalators, central air-conditioning, and other similar building services. c. Outside construction — Clearing and grading of undeveloped land and the fixed, auxiliary structures which the project owner builds within the property lines. Also, roadways, bridges, parking lots, utility connections, outdoor lighting, pools, athletic fields, piers, wharves and docks, and all similar auxiliary facilities. FOR HEAVY NONBUILDING PROJECTS In addition to a, b, and c, construction INCLUDES: d. Fixed works, such as power plants, dams, highways, bridges, reservoirs and sewer and water facilities. e. Machinery and equipment which are integral parts of structures. Also fixed, largely site -fabricated equipment such as storage tanks. f. The following types of equipment: boilers, towers and fixtures. EXCLUDE: Movable machinery and equipment which are not integral parts of structures. Also, for power generation plants, exclude primary power producing machinery such as generators, reactors, and steam engines. 10. REMARKS Item 5a — Estimate the total amount to be paid to construction contractors by the project owner for work done on this. project. Item 5b — Estimate the total cost of labor by the owner's construction employees working on the project, including supervisory personnel assigned to the project. Include the total cost of all construction materials supplied by the owner, including those the owner expects to supply to the contractor for installation in this project. Item 5c — Sum of values reported in items 5a and 5b. This is the value to be reported in item 8, monthly value of construction put in place. Item 6 — Estimate the total amount of fees which the project owner has paid or will pay to architectural and engineering firms for work on this project. Also estimate the total cost of all other construction items which the project owner will allocate on his books to this project. Include the project owner's overhead and office costs, the cost of design work by the owner's staff, and other miscellaneous construction fees and costs allocated on the owner's books. DO NOT include the cost of movable machinery and equipment, land, and furniture and furnishings. If book figures are not available, reasonable estimates are acceptable. ► Section E — MONTHLY CONSTRUCTION PROGRESS REPORT Item 8 — Report the monthly value of construction put in place for the costs associated with item 5c. These costs include: a. Work done by contractors and/or subcontractors, including any retainage being withheld until the work is complete. b. The cost of any materials installed which were provided by the owner. c. The work done by the project owner's own construction employees, including supervisory personnel assigned to this project. Initially, report monthly values from the start month to the most current month shown in item 8. Then each month, when the form is returned to you, report for the month shown and any revisions which you might have. When entering monthly data, be sure to report the costs in the month in which the work was done rather than in the month in which payment was made. If the contractor's bills are for periods other than monthly, estimate a monthly amount. In each month where there is no construction, enter a zero. Item 9 — If construction is complete except for some minor work or retainage (up to 3 percent of item 5c), you may stop reporting on this project by indicating in item 10, Remarks, and entering the completion date in item 9. ► Section F — PERSON TO CONTACT REGARDING THIS REPORT Item 11 — Enter the name, title, address, telephone and fax number of the person who can answer questions about this report. PERSON TO CONTACT REGARDING THIS REPORT — Please print or type 711a-Name b. Title I c. Telephone Area code I Number I Extension d. Organization h UHM C-700(SL) (6-18-2013) e. Address f. Fax Area code I Number Gary Harper Construction, Inc. 14831223rd St SE, Snohomish, WA 98296 Ph: (360) 863-1955, Fax: (360) 863-1966 Pay Request No. 2 3/8/14 - 04/07/14 Misty Cove Lift Station Replacement City of Renton Project ##WWP-27-3678 Bid No. Bid Item Unit Price Qty Amount as Bid Current Completion. Amount % Previous Completion Amount % Total Completion Amount % Balance to Complete Amount % 1 Mob, demob, site prep & clean up LS 45,100.00 0% 22,550.00 50% 22,550.00 50% 22,550.00 50% 2 Temporary erosion & sediment control LS 3,700.00 925.00 25% 1,850.00 50% 2,775.00 75% 925.00 25% 3 Traffic Control LS 1,300.00 0% 1,300.00 100% 1,300.00 100% - 0% 4 Temorary bypass pumping system LS 24,500.00 0% 0% - 0% 24,500.00 100% 5 Site work & utilities LS 78,900.00 31,560.00 40% 31,560.00 40% 63,120.00 80% 15,780.00 20% 6 Trenchless gravity sewer LS 120,500.00 46,995.00 39% 73,505.00 61% 120,500.00 100% - 0% 7 Unscheduled excavation 39.00 50 CY 1,950.00 390.00 10 CY 0 CY 390.00 10 CY 1,560.00 40 CY 8 Unscheduled structural backfill 26.00 50 CY 1,300.00 260.00 10 CY 0 CY 260.00 10 CY 1,040,00 40 CY 9 Trench safety & shoring LS 119,900.00 35,970.00 30% 77,935.00 65% 1 113,905.00 95% 1 5,995.00 5% 10 Dewatering LS 48,100.00 6,734.00 14% 38,480.00 80% 45;214.00 94% 2,886.00 6% 11 Asphalt pavement 233.00 70 Ton 16,310.00 0% 0% - 0% 16,310.00 100% 12 Existing Lift Station conversion LS 13,200.00 0% 0% - 0% 13,200.00 100% 13 Lift Station structural - LS 39,800.00 0% 0% - 0% 39,800.00 100% 14 Electrical building structural LS 40,600.00 0% 0% - 0% 40,600.00 100% 15 Misty Cove Lift Station pumps & motors LS 37,800.00 24,200.00 64% 0% 24,200.00 64% 13,600.00 36% 16 Devils Elbow Lift Station pump & motor LS 24,200.00 20,800.00 86% 0% 20,800.00 86% 3,400.00 14% 17 Mechanical LS 30,000.00 0% 2,700.00 9% 2,700.00 9% 27,300.00 91% 18 Electrical LS 75,300.00 3,427.50 5% 0% 3,427.50 5% 11,872.50 95% 19 Finishes LS 19,700.00 0% 0% - 0% 19,700.00 100% 20 O&M manuals and on -site owner training LS 2,500.00 0% 0% - 0% 2,500.00 100% 21 Construction records LS 5,000.00 0% 0% - 0% 5,000.00 100% Totals $ 749,660.00 $ 171,261.50 23% $ 249,880.00 33% $ 421,141.50 56% $ 328,518.50 44% WSST 9.5% 16,269.84 23,738.60 .40,008.44 - Less 5% Retention (8,563.08) (12,494.00) (21,057.08) Less Previous Payments 1 (261,124.60) (261,124.60) Amount Due: $ 178,968.27 1 11 $ - 1 11 $ 178,968.27 1300000507009 BASIN,FRP TOP-150 EA WITH KIT Notes: 6199910 CONNECTION,DISCH EA TOP 3X3"RH Cl Notes: 6200010 CONNECTION,DISCH EA TOP 3X3"LH Cl 1 Notes: Invoice �Ij .�< IS-f.I 3� Invoice Number: 75637 1.00 Serial Mot Information 1.00 SeriallllLot Information 1.00 Serial N/l.ot Information 5565101 Notes: VALVE,FLUSH-MIX EA T1.00 T Serial #/Lot Information: V 31718300002 NP2754 35/460/3 50' S82 EA 1.00 _ FM+ FLS FV 4 — G /a/ csf44..r-r Notes. Sei fNLot Information. Ae P;t-,r J P� 31718301410001 30851900136 NP256-3 4/46013 50' FM EA 2.00 _ FLS FV+ GPH Notes: Serial WWI Information: 30851901410175, 30851901410174 QUOTE Per WECI Quote EA 1.00 Notes, Serial OlLot Information: NP 3085 & 3171 Page: 2 of 2 Subtotal: 45,000.00 Freight: 0.00 Misc. Charge: 0.00 Sales Tax: 0.00 Pre -Allocated Credit 0.00 Total Due: 45,000.00 Advanced Power LLC PO Box 13705 Mill Creek, WA 98082 Bill To Gary Harper Construction Inc 14831 223rd Si SE Snohomish WA 98296-3989 Invoice Date Invoice # 4/1l2014 25214 P.O. No. Terms Project 1319-01 Net 30 1319-Misty Cove Lir... Description Est Amt Prior Amt Prior % Curr % Total % Amount MISTY COVE LILT STATION REPLACEMENT ELECTRICAL PANELS 21,325.00 16.07% 16.07% 3,427.50 LIGI•ITING 3,200.00 0.00% 0.000/0 0.00 UNDERGROUND ELECTRICAL & 11,395.00 0.00% 0.00% 0.00 VAULTS PUMP STATION ELECTRICAL 31,902.00 0.000/0 0.00% 0.00 INSTRUMENTATION 4,000.00 0.00% 0.00% 0.00 Total $3,427.50 Advanced Power LLC PO Box 13705 Mill Creek, WA 98082 Name / Address Gary Harper Construction Inc I4831 223rd St Si Snohomish WA 98296-3989 Schedule ®f Values Dale 3/28/2014 Project 1319-Misty Cove Lir.. Description oly Cost Total MISTY COVE LIFT STATION REPLACEMENT ELECTRICAL PANELS 1 21,325,00 21,325.00 LIGHTING 1 3,200.00 3,200.00 UNDERGROUND ELECTRICAL & VAULTS 1 11,395.00 11,395.00 PUMP STATION ELECTRICAL 1 31,902.00 31,902.00 INSTRUMENTATION 1 4,000.00 4,000.00 Total $71,822.00 Phone # 425-481-8260 Designed Groundwater Services, LLC PO Box 366, Puyallup, WA 98371 Phone 251-682-7330 Fax 253-841-2013 Jamie@designedgroundwater.com GARY HARPER CONSTRUCTION, INC 14831 222rd ST SE SNOHOMISH, WA 98296 INVOICE Invoice No- 14.01.02 Dater April 03. 2014 PROJECT PAYMENT CONTRACT NUMBER PROJECT NAME TERMS NUMBER Misty Cove Lift Contract 1401 Station Terms WWP 21-3678 DESCRIPTION CONTRACT AMOUNT CONTRACT QUANtTY UNIT PRICE UM COMPLETED TO DATE INVOICED TO DATE TOTAL % INVOICED PRIOR QUANITY PRIOR AMOUNT PRIOR % CURRENT QUANtTY CURRENT % CURRENT AMOUNT DEWATERING SYSTEM $44,615.00 1 544.615.00 LS 0.95 $42,384.25 95.00% 0.8 535,692.00 80.00% 0.15 15.00% $6,692.25 TOTALS 544,615.00 $42,384.25 S35.692.00 SUBTOTAL Non -Taxable TOTAL $6.692.25 $6,692.25 Page 1 of 1 �MAO% Armadillo Boring, Inc. n �P �O P.O. Box 12219 f I Salem OR 97309-0219 I 503-58"050 r ` License: CCB# 197195 Tk0 Billed To: Gary Harper Construction Inc 14831 223rd Street SE Snohomish WA 98296-1966 Due Date: 04/18/2014 Description Terms: 30DY Supplied and Installed 20" OD steel casing as per contract /Z/70 Credit: if payment Is received in full by 4/15/14 (charge back amt) A service charge of 18.00 % per annum W11 be charged on at/ amounts overdue on regular statement dates. Thank you for your prompt payment! Contract Invoice �] Invoice#: 14-7008 57 Date:03119/2014 Project: GHC-Renton Swr. Renton WA Order# Amount 29,800.00 -1.428.00 �� Non -Taxable Amount: 28,372.00 Taxable Amount: 0.00 Sales Tax: 0.00 Amount Due 28,372.00 Gary Harper Construction, Inc. Pay Request No. 1 Revised Misty Cove Lift Station Replacement 14831223rd St SE, Snohomish, WA 98296 2/6/14 - 03/07/14 City of Renton Project #WWP-27-367f Ph: (360) 863-1955, Fax: (360) 863-1966 Bid No. Bid Item Unit Price Qty Amount as Bid Current Completion Amount % Previous Completion Amount % Total Completion Amount % Balance to Complete Amount % 1 Mob, demob, site prep & clean up LS 45,100.00 22,550.00 50% 0% 22,550.00 50% 22,550.00 50% 2 Temporary erosion & sediment control LS 3,700.00 1,850.00 50% 0% 1,850.00 50% 1,850.00 50% 3 Traffic Control LS 1,300.00 1 1,300.00 100% 0% 1 1,300.00 100% - 0% 4 Temorary bypass pumping system LS 24,500.00 0% 0% - 0% 24,500.00 100% 5 Site work & utilities LS 78,900.00 31,560.00 40% 0% 31,560.00 40% 47,340.00 60% 6 Trenchless gravity sewer LS 120,500.00 73,505.00 61% 0% 73,505.00 61% 46,995.00 39% 7 Unscheduled excavation 39.00 50 CY 1,950.00 0% 0% - 0% 1,950.00 100% 8 Unscheduled structural backfill 26.00 50 CY 1,300:00 0% 0% - 0% 1,300.00 100% 9 Trench safety & shoring LS 119,900.00 77,935.00 65% 0% 77,935.00 65% 41,965.00 35% 10 Dewatering LS 48,100.00 38,480.00 80% 0% 38,480.00 80% 9,620.00 20% 11 Asphalt pavement 233.00 70 Ton 16,310.00 0% 0% - 0% 16,310.00 100% 12 Existing Lift Station conversion LS 13,200.00 0% 0% - 0% 13,200.00 100.% 13 Lift Station structural LS 39,800.00 0% 0% - 0% 39,800.00 100% 14 Electrical building structural LS 40,600.00 0% 0% - 0% 40,600.00 100% j 15 Misty Cove Lift Station pumps & motors LS 37,800.00 0% 0% - 0% 37,800.00 100% 16 Devils Elbow Lift Station pump & motor LS 24,200.00 0% 0% - 0% 24,200.00 100% 17 Mechanical LS 30,000.00 2,645.31 9% 0% 2,645.31 9% 1 27,354.69 91% 18 Electrical LS 75,300.00 0% 0% - 0% 75,300.00 100% 19 Finishes LS 19,700.00 0% 11 0% - 0% 19,700.00 100% 20 O&M manuals and on -site owner training LS 2,500.00 0% 0% - 0% 2,500.00 100% 21 Construction records LS 5,000.00 0% 0% - 0% 11 5,000.00 100% Totals $ 749,660.00 $ 249,825.31 33% $ - 0% $ 249,825.31 100% $ 49.9,834.69 0% WSST 9.5% 23,733.40 - 23,733.40 Less 5% Retention (12,491.27) 11 - (12,491.27) Amount Due: $ 261,067.45 $ - $ 261,067.45 Designed Groundwater Services, LLC PO Box 366, Puyallup, WA 98371 Phone 253.682.7330 Fax 253.841.2013 JamieCfdesignedgroundwater.com GARY HARPER CONSTRUCTION, INC 14831 222rd ST SE SNOHOMISH, WA 98296 INVOICE Invoice No: 14.01.01 Date: March 05, 2014 PROJECT [ PAYMENT- CONTRACT NUMBER .. PROJECT NAME TERMS 'NUMBER Misty Cove Lift Contract 14.01 Station Terms WWP-27-3678 _DESCRIPTION CONTRACT;' AMOUNT CONTRACT - 'QUANITY- ' .. - - UNff PRICE, - UM =: COMPLETED TO _ DATE -INVOICED TO +DATE, - TOTAL,% INVOICED:. _ PRIOR QUANITY- PRIOR AMOUNT PRIOR % ., - CURRENT , _ QUANITY i CURRENT % CURRENT - AMOUNT DEWATERING SYSTEM $44,615.00 1 $44,615.00 LS 0.8 $35,692.00 80.00% 0 $0.00 0.00% 0.8 80.00% $35,692.00 TOTALS $44,615.D0 $35,692.00 $0.00 SUBTOTAL Non -Taxable TOTAL $35,692.00 535,692.00 Page 1 of 1