Loading...
HomeMy WebLinkAboutWWP273656Denis Law City Of, o Mavor . o Public Works Department -Gregg Zimmerman, P. E.,Administrator March 11, 2014 Mr. Robert Schommer Systems Interface, Inc. 1916 220th Street SE #M-102 Bothell, WA 98021 RE: 2012 Sewer Telemetry Upgrades Project Completion Dear Mr. Schommer: The City has received notification from RH2 Engineering that they have reviewed the status of the Wastewater Supervisory Control and Data Acquisition (SCADA) system upgrades implemented by Systems Interface, Inc. under City Contract CAG-12-150, 2012 Sewer Telemetry Upgrades Project. RH2 Engineering reviewed the final system, the system operations and maintenance documents, and the spare parts list and has recommended that the City accept the SCADA system upgrades as complete. This letter is to notify Systems Interface, Inc. that we consider the work complete and we are preparing the paperwork to close-out the contract and to have our Council formally accept the work. We appreciate the work that Systems Interface, Inc. and subcontractors have done on this project. Sincerely, Michael A. Benoit Wastewater Utility Project Manager H:\File Sys\WWP - WasteWater\WWP-27-3656 2012 Telemetry Upgrades\Systems Interface 04.doc\MABtp Renton City Hall • 1055 South Grady Way • Renton, Washington 98057 • rentonwa.gov Denis City Of ley O Mayor P r ` • Public Works Department - Gregg Zimmerman, P. E., Administrator January 2, 2013 Mr. Robert Schommer Systems Interface, Inc. 22125 17th Avenue SE, Suite 111 Bothell, WA 98021 RE: CAG-12-150, 2012 SEWER TELEMETRY UPGRADES EXECUTED CONTRACT NOTICE TO PROCEED Dear Mr. Schommer: Enclosed is your executed original of the contract for the 2012 Sewer Telemetry Upgrades project. Also included is a copy of the executed contract. This letter shall serve as your notice to proceed in accordance with the contract specifications. Your first chargeable workday shall be January 3, 2013. All work shall be completed within the 150 working days allowed by the contract, except as additional days may be granted by the City. If you have any questions, please contact me at 425-430-7206 or by email at mbenoit@rentonwa.gov. Sincerely, Michael A. Benoit Wastewater Utility Project Manager Enclosures H:\File Sys\WWP - WasteWater\WWP-27-3656 2012 Telemetry Upgrades\Notice to Proceed CAG-12-150.doc\MABtp Renton City Hall • 1055 South Grady Way • Renton, Washington 98057 9 rentonwa.gov Michael A Benoit From: Seymour, Mark A. [mas@systems-interface.com] Sent: Friday, April 19, 2013 10:16 AM To: Michael A Benoit; Chris Roberts Cc: Beesley, Craig S. Subject: Telemetry Upgrade - Advanced Power RF11 Attachments: Advanced Power RF11.pdf Attached is an RFI from Advanced Power on an issue that has been brought up before. Advance Power is requesting changing the repeater mounting location at the Hazen Reservoir. Note that this is a price neutral change that would increase safety and ease of access to the new repeater. Feel free to reply in a separate document. It is not necessary to reply using Advanced Power's form. Thanks. Mark Seymour Project Engineer Systems Interface Inc. 425.481.1225 x226 t (1 0 J J�� V f, f, 0 I • ADVANCED POWER, LLC PO BOX 13705 MILL CREEK, WA 98082 PH: (425) 481--8260 1 Fax: (425) 486-3162 REQUEST FOR INFORMATION TO: - :5 S T9M-5 - /V r5& F,4G'e-- R GENERAL'S RFI NO. OUR RFI NO, DATE SENT TO G/C: DATE SENT TO ENGINEER: FROM: __LL U /I/ vv/ ff U Vffi PROJECT NAME_ I TT y a AF, ANSWER REQUESTED BEFORE THIS DATE: h 1 Z DRAWING N0. —d y`.'�"'�• DESCRIPTION OF REQUEST: W D(ILD ,M,%&IN7-XAIC TRE/YCW PeOP,6SL1) klb.-0 -&El _ ON r,`lF f7N5.rbF- dF- ZME S;4F,= 7-Yg,4r.� zill6-,PE14rA b 7H- , FX.ZS'r2"1y6 leftLbr,4/i 64/ GGF'55 J TLTY ,'o 9 5.ekV.r�T`AA5.41 1VAJ �VrAZ-AIX A� T'HE AiVA✓FZ� NOTE fllfZFIV 5 PLAiFbeM--z:)r '�9,5 M6le6 WIDRl 1J2VG 56W5 eZ r A�Jc 7ytf�! 611 ST"1 � , SCHEDULE IMPACT: Cl YES 9 NO ENGINEER'S ANSWER: COST IMPACT': ❑ YES x NO SIGNED BY: DATE: ADVANCED POWER, LLC PO BOX 13705 MILL CREEK, WA 98082 PH: (425) 481-8260 Fax: (425) 486-3162 REQUEST FOR INFORMATION TO: :5 1ST .1 %s rfll %�%� ��G'� GENERAL'S RFI NO. OUR RFI NO. `_Q2 DATE SENT -TO G/C: FROM: PROJECT NAME* Cr:1 l ,Y o/ J�E_1117Z I Tf•L/n1�`AIL Ley U1-16Rg11(HgzEN �2�SFedoI�2 ANSWER REQUESTED BEFORE THIS DATE: DRAWING.NO. —O `7 `- �i�ZIi� I�ESV •�/'�LSD Ste_ FD --- �1f T tz.L'� DESCRIPTION 'OF REQUEST: ,aT�� -Z"NS.t d F E 5�}F5 T �r� r�V� E f1 EAlb T uni. rrc .6/f/S.LD o� T11E X 1, A16 W0GG/� OT b R Mo�� 5 ��iSr laid �-Gc�'.�s��,�ry �'Q �e s.�,e►��-�rv� �n�� ��,�.��rs���.ru�- �'H.E �,��✓��., . VOTE, y,4ZE_/1/S fiA?fd,R"."dFF,=izS N0RE W0k>)t1 lVG�P�fG�/c�Fa '7VaAl Vr<rN_T SCHEDULE IMPACT: ❑ YES X NO COST IMPACT': Cl YES NO ENGINEER'S ANSWER: SIGNED BY: DATE: EXISTING RADIO REPEATER PANEL PROPOSED 3,4' GRS CONDUIT CONTAINING 2412 AND 1412 GRO CONDUCTORS. INSTALL CONDUIT BETWEEN EXISTING RADIO REPEATER PANEL AND PROPOSED RADIO REPEATER PANEL AND TERMINATE CONDUCTORS AT EXISTING 120 VAC POWER SUPPLY PROPOSED RADIO REPEATER PANEL SECURED TO GUARD RAIL WITH STAINLESS STEEL HARDWARE PROPOSED 1 112' GRS CONDUI' BETWEEN PROPOSED RADIO REPEATER PANEL AN[ PROPOSED ANTENNA. INSTALI PROPOSED ANTENNA CABLE INSIDE PROPOSED CONDUIT OBLIQUE VIEW OF PROPOSED RADIO REPEATER AND ANTENNA, HAZEN RESERVOIR MOT TO SC&E PROPOSED ANTENNA EXISTING ANTENNA PROPOSED ANTENNA SUPPORT PROPOSED 120 VAC POWER TO THE PROPOSED RADIO REPEATER PANEL FROM THE EXISV REPEATER PANEL T PROPOSED 3/4' GRS i INSTALL A PROPOSED SUPPORT ARM ON EXISTING POLE TO ATTACH PROPOSED ANTENNA. EXISTING ANTENNA, HAZEN RESERVOIR MOT TO Zia EXISTING RADIO REPEATER PANEL, HAZEN RESERVOIR WT TO SCME n=m m^m F N G I N E F R S PLANNERS SC IFNTISTS RH2 [NGINEKRSNG. IN, MtP: //....1n2.com mala..v2— 1.EW,:1- 454 RYY Norm Rood DOTHIELL 22722 20u lk a SE. S.d. taco RA(T WCHATCH![ I1o�r�mo 300 S— St—t SA* 5 RCHLANO 1 114 CP lk Pont Din, Sude C fILYQOAII 2021 RR W n Rd. Svt4 107 TACOMA dorsAaPo4 621 P.Ac --- S.". 1D4 SCALE SHO11N 0 1' 2" ORAWNG IS NOT TO SCALE IF BAR IS NOT 2 LONG KKn aB E04 .P CMR • Oct 19, 2012t MO .. RE„ 4 40 112-022 13 ..c.•.4 WSCU-0-ELECO6.OWG E N GIN E E_R_S _ __P_L_ A NNE _R S I E I S T S March 10, 2014 RH2 ENGiNEERiNG, INC. www.rh2.00m mailbox@rh2.com 1,800,720.8052 Mr. Mike Benoit Engineering Specialist III, Wastewater Engineering/Tech. Services City of Renton WASHINGTON Planning/Building/Public Works LOCATIONS 1055 South Grady Way, 5111 Floor BOTHELL Renton, WA 98057 MAIN OFFICE 22722 291, Drive SE, Suite 210 Sent via: Email Bothell, WA 9W21 BELLINGHAM Subject: Project Acceptance for Wastewater SCADA Upgrade Dear Mr. Benoit: EAST WENATCHEE RH2 Engineering, Inc., (RH2) has reviewed the status of the wastewater supervisory control I$SAQUAH and data acquisition (SCADA) system upgrade implemented by Systems Interface, Inc., and Accu-Comm, Inc. RICHLAND RH2 reviewed the final system, the system operations and maintenance documents, and the spare parts list. RH2 accepts the SCADA system upgrade as complete at this time. We TACOMA recommend the City of Renton (City) also accept the project as complete. Should you have any questions or concerns, please contact me at (425) 951-5386. It has OREGON been a pleasure working with the City staff on this project. LOCATIONS Sincerely, NORTHERN OREGON RH2 ENGINEERING, INC. MAIN OFFICE 6500 sw Macadam Ave, Suite 100 Portland, OR 97239 SOUTHERN OREGON Central Point James Swanson Project Manager COASTAI ORFGON North Bend )s/19/- 3/10/2014 10:24 A.11 \\rh2\d&\Bothell\Dan\1iEN\112-022\SDC\Lti to M Benoit re Project AccTtmce 03-10-2014.docx