March 11, 2014
Mr. Robert Schommer
Systems Interface, Inc.
1916 220th Street SE #M-102
Bothell, WA 98021
RE: 2012 Sewer Telemetry Upgrades Project Completion
Dear Mr. Schommer:
The City has received notification from RH2 Engineering that they have reviewed the
status of the Wastewater Supervisory Control and Data Acquisition (SCADA) system
upgrades implemented by Systems Interface, Inc. under City Contract CAG-12-150, 2012
Sewer Telemetry Upgrades Project.
RH2 Engineering reviewed the final system, the system operations and maintenance
documents, and the spare parts list and has recommended that the City accept the
SCADA system upgrades as complete.
This letter is to notify Systems Interface, Inc. that we consider the work complete and
we are preparing the paperwork to close-out the contract and to have our Council
formally accept the work.
We appreciate the work that Systems Interface, Inc. and subcontractors have done on
this project.
Sincerely,
Michael A. Benoit
Wastewater Utility Project Manager
H:\File Sys\WWP - WasteWater\WWP-27-3656 2012 Telemetry Upgrades\Systems Interface 04.doc\MABtp
Renton City Hall • 1055 South Grady Way • Renton, Washington 98057 • rentonwa.gov
Denis City Of ley O
Mayor
P r ` •
Public Works Department - Gregg Zimmerman, P. E., Administrator
January 2, 2013
Mr. Robert Schommer
Systems Interface, Inc.
22125 17th Avenue SE, Suite 111
Bothell, WA 98021
RE: CAG-12-150, 2012 SEWER TELEMETRY UPGRADES
EXECUTED CONTRACT
NOTICE TO PROCEED
Dear Mr. Schommer:
Enclosed is your executed original of the contract for the 2012 Sewer Telemetry
Upgrades project. Also included is a copy of the executed contract.
This letter shall serve as your notice to proceed in accordance with the contract
specifications. Your first chargeable workday shall be January 3, 2013. All work shall be
completed within the 150 working days allowed by the contract, except as additional
days may be granted by the City.
If you have any questions, please contact me at 425-430-7206 or by email at
mbenoit@rentonwa.gov.
Sincerely,
Michael A. Benoit
Wastewater Utility Project Manager
Enclosures
H:\File Sys\WWP - WasteWater\WWP-27-3656 2012 Telemetry Upgrades\Notice to Proceed CAG-12-150.doc\MABtp
Renton City Hall • 1055 South Grady Way • Renton, Washington 98057 9 rentonwa.gov
Michael A Benoit
From: Seymour, Mark A. [mas@systems-interface.com]
Sent: Friday, April 19, 2013 10:16 AM
To: Michael A Benoit; Chris Roberts
Cc: Beesley, Craig S.
Subject: Telemetry Upgrade - Advanced Power RF11
Attachments: Advanced Power RF11.pdf
Attached is an RFI from Advanced Power on an issue that has been brought up before. Advance Power is requesting
changing the repeater mounting location at the Hazen Reservoir. Note that this is a price neutral change that would
increase safety and ease of access to the new repeater.
Feel free to reply in a separate document. It is not necessary to reply using Advanced Power's form.
Thanks.
Mark Seymour
Project Engineer
Systems Interface Inc.
425.481.1225 x226 t
(1 0 J
J��
V f, f,
0
I
• ADVANCED POWER, LLC
PO BOX 13705 MILL CREEK, WA 98082
PH: (425) 481--8260 1 Fax: (425) 486-3162
REQUEST FOR INFORMATION
TO: - :5 S T9M-5 - /V r5& F,4G'e-- R GENERAL'S RFI NO.
OUR RFI NO,
DATE SENT TO G/C:
DATE SENT TO ENGINEER:
FROM: __LL U /I/ vv/ ff U Vffi
PROJECT NAME_ I TT y a AF,
ANSWER REQUESTED BEFORE THIS DATE: h 1
Z
DRAWING N0. —d y`.'�"'�•
DESCRIPTION OF REQUEST: W D(ILD ,M,%&IN7-XAIC TRE/YCW PeOP,6SL1) klb.-0
-&El _ ON r,`lF f7N5.rbF- dF- ZME S;4F,= 7-Yg,4r.� zill6-,PE14rA b 7H- ,
FX.ZS'r2"1y6 leftLbr,4/i
64/
GGF'55 J TLTY ,'o 9 5.ekV.r�T`AA5.41 1VAJ �VrAZ-AIX A� T'HE AiVA✓FZ�
NOTE fllfZFIV 5 PLAiFbeM--z:)r '�9,5 M6le6 WIDRl 1J2VG 56W5 eZ r A�Jc 7ytf�! 611 ST"1 � ,
SCHEDULE IMPACT: Cl YES 9 NO
ENGINEER'S ANSWER:
COST IMPACT': ❑ YES x NO
SIGNED BY: DATE:
ADVANCED POWER, LLC
PO BOX 13705 MILL CREEK, WA 98082
PH: (425) 481-8260 Fax: (425) 486-3162
REQUEST FOR INFORMATION
TO: :5 1ST .1 %s rfll %�%� ��G'� GENERAL'S RFI NO.
OUR RFI NO. `_Q2
DATE SENT -TO G/C:
FROM:
PROJECT NAME* Cr:1 l ,Y o/ J�E_1117Z I Tf•L/n1�`AIL Ley U1-16Rg11(HgzEN �2�SFedoI�2
ANSWER REQUESTED BEFORE THIS DATE:
DRAWING.NO. —O `7 `- �i�ZIi� I�ESV •�/'�LSD Ste_ FD --- �1f T tz.L'�
DESCRIPTION 'OF REQUEST: ,aT��
-Z"NS.t d F E 5�}F5 T �r� r�V� E f1 EAlb T
uni. rrc .6/f/S.LD o� T11E X 1, A16 W0GG/� OT b R Mo�� 5 ��iSr laid
�-Gc�'.�s��,�ry �'Q �e s.�,e►��-�rv� �n�� ��,�.��rs���.ru�- �'H.E �,��✓��., .
VOTE, y,4ZE_/1/S fiA?fd,R"."dFF,=izS N0RE W0k>)t1 lVG�P�fG�/c�Fa '7VaAl Vr<rN_T
SCHEDULE IMPACT: ❑ YES X NO COST IMPACT': Cl YES NO
ENGINEER'S ANSWER:
SIGNED BY: DATE:
EXISTING RADIO REPEATER
PANEL
PROPOSED 3,4' GRS CONDUIT
CONTAINING 2412 AND 1412
GRO CONDUCTORS. INSTALL
CONDUIT BETWEEN EXISTING
RADIO REPEATER PANEL AND
PROPOSED RADIO REPEATER
PANEL AND TERMINATE
CONDUCTORS AT EXISTING
120 VAC POWER SUPPLY
PROPOSED RADIO REPEATER
PANEL SECURED TO GUARD
RAIL WITH STAINLESS STEEL
HARDWARE
PROPOSED 1 112' GRS CONDUI'
BETWEEN PROPOSED RADIO
REPEATER PANEL AN[
PROPOSED ANTENNA. INSTALI
PROPOSED ANTENNA CABLE
INSIDE PROPOSED CONDUIT
OBLIQUE VIEW OF PROPOSED RADIO REPEATER
AND ANTENNA, HAZEN RESERVOIR
MOT TO SC&E
PROPOSED
ANTENNA
EXISTING
ANTENNA
PROPOSED
ANTENNA
SUPPORT
PROPOSED 120 VAC POWER TO THE
PROPOSED RADIO REPEATER
PANEL FROM THE EXISV
REPEATER PANEL T
PROPOSED 3/4' GRS
i
INSTALL A PROPOSED SUPPORT
ARM ON EXISTING POLE TO
ATTACH PROPOSED ANTENNA.
EXISTING ANTENNA, HAZEN RESERVOIR
MOT TO Zia
EXISTING RADIO REPEATER PANEL, HAZEN RESERVOIR
WT TO SCME
n=m m^m
F N G I N E F R S
PLANNERS
SC IFNTISTS
RH2 [NGINEKRSNG. IN,
MtP: //....1n2.com
mala..v2— 1.EW,:1-
454 RYY Norm Rood
DOTHIELL
22722 20u lk a SE. S.d. taco
RA(T
WCHATCH![ I1o�r�mo
300 S— St—t SA*
5
RCHLANO
1 114 CP lk Pont Din, Sude C
fILYQOAII
2021 RR W n Rd. Svt4 107
TACOMA dorsAaPo4
621 P.Ac --- S.". 1D4
SCALE SHO11N
0 1' 2"
ORAWNG IS NOT TO SCALE
IF BAR IS NOT 2 LONG
KKn aB E04
.P CMR
• Oct 19, 2012t MO
.. RE„ 4
40 112-022 13
..c.•.4 WSCU-0-ELECO6.OWG
E N GIN E E_R_S
_ __P_L_ A NNE _R S
I E I S T S
March 10, 2014
RH2 ENGiNEERiNG, INC.
www.rh2.00m
mailbox@rh2.com
1,800,720.8052
Mr. Mike Benoit
Engineering Specialist III, Wastewater Engineering/Tech. Services
City of Renton
WASHINGTON
Planning/Building/Public Works
LOCATIONS
1055 South Grady Way, 5111 Floor
BOTHELL
Renton, WA 98057
MAIN OFFICE
22722 291, Drive SE, Suite 210
Sent via: Email
Bothell, WA 9W21
BELLINGHAM Subject: Project Acceptance for Wastewater SCADA Upgrade
Dear Mr. Benoit:
EAST WENATCHEE
RH2 Engineering, Inc., (RH2) has reviewed the status of the wastewater supervisory control
I$SAQUAH and data acquisition (SCADA) system upgrade implemented by Systems Interface, Inc., and
Accu-Comm, Inc.
RICHLAND RH2 reviewed the final system, the system operations and maintenance documents, and the
spare parts list. RH2 accepts the SCADA system upgrade as complete at this time. We
TACOMA recommend the City of Renton (City) also accept the project as complete.
Should you have any questions or concerns, please contact me at (425) 951-5386. It has
OREGON been a pleasure working with the City staff on this project.
LOCATIONS Sincerely,
NORTHERN OREGON RH2 ENGINEERING, INC.
MAIN OFFICE
6500 sw Macadam Ave, Suite 100
Portland, OR 97239
SOUTHERN OREGON
Central Point James Swanson
Project Manager
COASTAI ORFGON
North Bend )s/19/-
3/10/2014 10:24 A.11 \\rh2\d&\Bothell\Dan\1iEN\112-022\SDC\Lti to M Benoit re Project AccTtmce 03-10-2014.docx