Loading...
HomeMy WebLinkAboutWWP273712 (2)D"W h 7NMisP+tlt'tzitlOe Request for Approval of Material Contract Number 'AG-I5-118(City ot'Renton No_ WW9-27-03712) FA Number SIR Date III 6 21)16 Section /Title of Project Central Renton Suter Interceptor Reline & Upsize County King Contractor Roald Construction Northwest, Inc. Subcontractor This form shall be completed prior to submittal. If this form is not complete at time of submittal it may be returned for information that was omitted. For assistance in completing, see Instructions and Example For WSDOT Use Only RAM # 017-1 Bid Item No. Material or Product Type Name and Location of Fabricator, Manufacturer or Pit Number Specification Reference PE QPL Code HdgtrJQPL Code 8 Manhole Casting & Cover Olympic Foundry Inc., Seattle WA Project Engineer Date State Materials Engineer Date 171 Acceptance Action Codes for use by Project Engineer and State Materials Laboratory 1. Acceptance Criteria: Acceptance based upon 'Satisfactory' Test Report for samples of materials to be incorporated into project. 2 Acceptance Critena: Mfg. Cert. of Compliance for 'Acceptance' prior to use of material. 3. Acceptance Criteria: Catalog Cuts for 'Acceptance' prior to use of material. C'ataloc Cut Approved ❑ Y,:, ❑ N". 4. Acceptance Criteria: Submit Shop Drawings for'Approval' prior to fabrication of material. 5. Acceptance Criteria: Only'Approved for Shipment'.'WSDOT Inspected' or'Fabrication Approved Decal' material shall be used. & Acceptance Criteria: Submit Certificate of Materials Origin to Project Engineer Office. 7. Acceptance Criteria: Request Transmitted to State Materials Laboratory for Approval Action. S. Source Approved: 9. Approval Withheld: Submit samples for preliminary evaluation. 10. Approval Withheld 11. Miscellaneous Acceptance Criteria. Remarks: Project Engineer Distribution ❑ Contractor ❑ Region Operations Engineer ❑ Fabrication Inspection DOT Form 350-071 EF Revised 12/2012 ❑ Region Materials ❑ State Materials Lab MIS 47365 State Materials Engineer Distribution ❑ General File ❑ Signing Inspection ❑ Other Washington State VAF Department of Transportation Request for Approval of Material Contract Number FA Number SR Date 91/27/2016 Section / Title of Project County Central Renton Sewer Interceptor Contractor — -- - Subcontractor RCN W This form shall be completed prior to submittal. If this form is not complete at time of For WSDOT Use Only submittal it may be returned for information that was omitted y For assistance in completing, see Instructions and Example RAM # Bid Material or Name and Location of Fabricator, Specification PE/QPL Hdgtr./QPL Item No Product/Type Manufacturer or Pit Number Reference Code Code (Fine Aggregate - Building CA7, A460, D336 Class 2 'Sand _ iCoarse Aggregate, 3/4" tAX125, A460. A 189, D336 AASHTO 57 - { - - - -- - -- ---- - -------- - !Coarse Aggregate 3/8" X125, A460, A189, D336 AASHT0 8 .Cement Type 1/11 i Lehigh, Delta B.C. 9-01 Fly Ash, Type F Lafarge. Centralia WA 9-23.9 Water Reducer Type A MasterPozaolith 80, BASF 9-23-6(2) —— ------ - --- Water Reducer Type F MasterGlenium 7500, BASF i 9-23.6(7) r i Air Entraining Admixture MasterAir AE 90, BASF 9-23.6(1) Water 1 Ciry 9-25.1 }- + -- " I I I I Project En i r I Date State Materials Engineer I Date Acceptance Action Codes for use by Project Engineer and State Materials Laboratory 1. Acceptance Criteria Acceptance based upon 'Satisfactory' Test Report for samples of materials to be incorporated into project. 2. Acceptance Criteria. Mfg. Cent. of Compliance for'Acceptance' prior to use of material. 3 Acceptance Criteria Catalog Cuts for 'Acceptance' prior to use of material. Catalog Cut Approvcd ❑ )'Cs ❑ No 4. Acceptance Criteria: Submit Shop Drawings for 'Approval' prior to fabrication of material. 5. Acceptance Criteria: Only'Approved for Shipment'. 'WSDOT Inspected' or'Fabrication Approved Decal' material shall be used 6. Acceptance Criteria: Submit Certificate of Materials Origin to Project Engineer Office. 7. Acceptance Criteria: Request Transmitted to State Material's Laboratory for Approval Action, 8 Source Approved: 9 Approval Withheld: Submit samples for preliminary evaluation. 10. Approval Withheld: 11. Miscellaneous Acceptance Criteria. Remarks: Project Engineer Distribution ❑ Contractor ❑ Region Materials ❑ Region Operations Engineer ❑ State Materials Lab ❑ Fabrication Inspection M/S 47365 DOT Form 350-071 EF Revised ' 2,2012 State Materials Engineer Distribution ❑ General File ❑ Signing Inspection ❑ Other -I/ ==n rt tale of ration Request for Approval of Material Contract Number 1 FA NumberSIR/ Date Al Section I Title of Project _�_ _7//rO/.6 County Contractor _. � Subcontractor ----- -- This form shall be completed prior to submittal If this form is not complete at time of submittal it may be returned for information that was omitted. For WSDOT Use Only For assistance in completing, see Instructions and Example RAM # B d Material or Name and Location of Fabricator. I Specification PE/QPL Item No. Product Type Manufacturer or Pit Number Hdqtr./QPL _ Reference Code Code H^4 el. i"pGGy-n ✓V»ifr �o�iiru Fig — — Project Engin r.' Date i State Materials EngineerI Date Acceptance Action Codes for u e by Project Engineer and State Materials Laboratory 1 Acceptance Criteria. Acceptance based upon 'Satisfactory' Test Report for samples of materials to be incorporated into project 2 Acceptance Criteria Mfg Cert of Compliance for 'Acceptance' prior to use of material. 3 Acceptance Criteria Catalog Cuts for 'Acceptance' prior to use of material Caralug Cui Appro.Ld ❑ No 4 Acceptance Criteria Submit Shop Drawings for 'Approval' prior to fabrication of material. 5 Acceptance Criteria Only'Approved for Shipment'. 'WSDOT Inspected' or'Fabrication Approved Decal' material shall be used 6 Acceptance CrReria Submit Certificate of Materials Origin to Project Engineer Office 7 Acceptance Criteria Request Transmitted to State Materials Laboratory for Approval Action E Source Approved 9 Approval Withheld Submit samples for preliminary evaluation 10 Approval Withheld 11 Miscellaneous Acceptance Criteria Remarks Project Engineer Distribution ❑ Contractor ❑ Region Materials ❑ Region Operations Engineer ❑ State Materials Lab ❑ Fabrication Inspection M/S 47365 DOT Form 350.071 EF Revised 1212012 State Materials Engineer Distribution ❑ General File ❑ Signing Inspection ❑ Other aP�'ft 0 it at�P o�'lallon Request for Approval of Material Contract Number 'AG-15-118(City of'Renton No. WW9-27-03712 FA Number ISR Date 6/13/2016 Section / Title of Project Central Renton Sewer Interceptor Reline & Upsize County King Contractor Road Construction Northwest, Inc. Subcontractor/Supplier NW Linings & Geotextile Products, Inc. This form shall be completed prior to submittal. If this form is not complete at time of submittal it may be returned for information that was omitted. For assistance in completing, see Instructions and Example For WSDOT Use Only RAM # 017-1 Bid Item No. Material or ProductType Name and Location of Fabricator, Manufacturer or Pit Number Specification Reference PE/QPL Code Hdgtr./QPL Code 019 Permeatex 4060 NW Linings & Geotextile Products, Inc. Kent WA 1-09.14 C Proje Trlee Date (,-; -i¢ -/(� State Materials Engineer Date / Acceptance Action Codes for use by Project Engineer and State Materials Laboratory 1. Acceptance Criteria: Acceptance based upon 'Satisfactory' Test Report for samples of materials to be incorporated into project. 2. Acceptance Criteria: Mfg. Cert. of Compliance for 'Acceptance' prior to use of material. 3. Acceptance Criteria: Catalog Cuts for 'Acceptance' prior to use of material. Catalog Cut Approved 13 Yes 1:1No 4. Acceptance Criteria: Submit Shop Drawings for'Approval' prior to fabrication of material. 5. Acceptance Criteria: Only'Approved for Shipment', 'WSDOT Inspected' or'Fabrication Approved Decal' material shall be used. 6. Acceptance Criteria: Submit Certificate of Materials Origin to Project Engineer Office. 7. Acceptance Criteria: Request Transmitted to State Materials Laboratory for Approval Action. 8. Source Approved: 9. Approval Withheld: Submit samples for preliminary evaluation. 10. Approval Withheld: 11. Miscellaneous Acceptance Criteria. Remarks: Project Engineer Distribution ❑ Contractor ❑ Region Operations Engineer ❑ Fabrication Inspection DOT Form 350-071 EF Revised 122012 ❑ Region Materials ❑ State Materials Lab M/S 47365 State Materials Engineer Distribution ❑ General File ❑ Signing Inspection ❑ Other Ankh,Wmilldmoon _ wI/ �P■rdeM+t T'r�t�Po�talYa� Contract Number FA Number CAG-15-118(City of Renton No. WW9-27-03712) Section / Title of Project Central Renton Sewer Interceptor Reline & Upsize Contractor Road Construction Northwest. Inc. Request for Approval of Material SR Date 2/8/2016 County King Subcontractor Ferguson Waterworks This form shall be completed prior to submittal. If this form is not complete at time of For WSDOT Use Only submittal it may be returned for information that was omitted. For assistance in completing, see Instructions and Example RAM # 017-1 Bid Material or Name and Location of Fabricator, Specification PE/QPL Hdgtr./QPL Item No. Product/Type Manufacturer or Pit Number Reference Code Code 7 Detectable Underground HARRIS INDUSTRIES, INC. 7-08.3(3)B Tape Huntington Beach CA 8 Flexible Couplings _ _ FERNCO INC Davison MI 7-05.3(5) 7 D3034 PVC Sewer Pipe Diamond Plastics Corp. Grand Island, NE 7-12.2 8 F679 PVC Sewer Pipe Diamond Plastics Corp. 7-12.2 Grand Island NE 8 Renton Sewer Manhole Cover East Jordan Iron Works Marysville WA7 7-05.4 Project En n r` Date State Materials Engineer Date Acceptance Action Codes for use by Project Engineer and State Materials Laboratory 1. Accep(ance Criteria: Acceptance based upon 'Satisfactory' Test Report for samples of materials to be incorporated into project. 2. AcGoptance Criteria: Mfg. Cert. of Compliance for 'Acceptance' prior to use of material. 3. Acceptance Criteria: Catalog Cuts for'Acceptance' prior to use of material. Catalog Cut Approved ❑ Yes ❑ No 4. Acceptance Criteria: Submit Shop Drawings for'Approval' prior to fabrication of material. 5. Acceptance Criteria: Only'Approved for Shipment', 'WSDOT Inspected' or'Fabrication Approved Decal' material shall be used. 6. Acceptance Criteria: Submit Certificate of Materials Origin to Project Engineer Office. 7. Acceptance Criteria: Request Transmitted to State Materials Laboratory for Approval Action. 8. Source Approved: 9. Approval Withheld: Submit samples for preliminary evaluation. 10. Approval Withheld: 11. Miscellaneous Acceptance Criteria. Remarks: Project Engineer Distribution ❑ Contractor ❑ Region Operations Engineer ❑ Fabrication Inspection DOT Form 350-071 EF Revised 12/2012 ❑ Region Materials ❑ State Materials Lab M/S 47365 State Materials Engineer Distribution ❑ General File ❑ Signing Inspection ❑ Other NOW 71tif�pa�alloe Request for Approval of Material Contract Number FA Number SR Date CAG-15-118(City of Renton No. WW9-27-03712 2/8/2016 Section / Title of Project County Central Renton Sewer Interceptor Reline & Upsize King Contractor Subcontractor Road Construction Northwest, Inc. This form shall be completed prior to submittal. If this form is not complete at time of submittal it may be returned for information that was omitted. For WSDOT Use Only For assistance in completing, see Instructions and Example RAM # 017-1 Bid Material or Name and Location of Fabricator, Specification PE/QPL Hdgtr./QPL Item No. Product/Type Manufacturer or Pit Number Reference Code Code 16 Gravel Barrow ICON Materials 7-08.3(1)C Auburn Pit 12001500 16 1 %" Crushed Rock/Recycled Concrete Stoneway Concrete Technical Services Black Rover 7-08.3(1)C 17 1 V Crushed Rock Quality Aggregates LLC Lake Francis 5-04.3(5) 17 5/8" Crushed Rock Quality Aggregates LLC Lake Francis 5-04.3(5) ? Project E ' n e Date (, '/C' -/ State Materials Engineer Date Acceptance Action Codes for use by Project Engineer and State Materials Laboratory 1. Ac ptance Criteria: Acceptance based upon 'Satisfactory' Test Report for samples of materials to be incorporated into project. 2. Acceptance Criteria: Mfg. Cert. of Compliance for'Acceptance' prior to use of material. 3. Acceptance Criteria: Catalog Cuts for'Acceptance' prior to use of material. Catalog Cut Approved I] Yes E3 No 4. Acceptance Criteria: Submit Shop Drawings for 'Approval' prior to fabrication of material. 5. Acceptance Criteria: Only'Approved for Shipment', 'WSDOT Inspected' or'Fabrication Approved Decal' material shall be used. 6. Acceptance Criteria: Submit Certificate of Materials Origin to Project Engineer Office. 7. Acceptance Criteria: Request Transmitted to State Materials Laboratory for Approval Action. 8. Source Approved: 9. Approval Withheld: Submit samples for preliminary evaluation. 10. Approval Withheld: 11. Miscellaneous Acceptance Criteria. Remarks: Project Engineer Distribution ❑ Contractor ❑ Region Operations Engineer ❑ Fabrication Inspection DOT Form 350-071 EF Revised 12/2012 ❑ Region Materials ❑ State Materials Lab M/S 47365 State Materials Engineer Distribution ❑ General File ❑ Signing Inspection ❑ Other 7tiw pi�wnt pa�talise Request for Approval of Material Contract Number AG- I 5-118(City of Renton No. WW9-27-03712 FA Number SR Date 2/8/2016 Section / Title of Project County Central Renton Sewer Interceptor Reline & Upsize King Contractor Road Construction Northwest, Inc. Subcontractor Lakeside Industries This form shall be completed prior to submittal. If this form is not complete at time of submittal it may be returned for information that was omitted. For assistance in completing, see Instructions and Example For WSDOT Use Only RAM # 017-1 Bid Item No. Material or Product/Type Name and Location of Fabricator, Manufacturer or Pit Number Specification Reference PE/QPL Code Hdgtr./QPL Code 21 ''/z' HMA for Pavement Repair Class 1/2" PG 64-22 Lakeside Industries Covington WA 9-03.8 Pro* er c ' t �, Date State Materials Engineer Date Acceptance Action Codes for use by Project Engineer and State Materials Laboratory Acceptance Criteria: Acceptance based upon 'Satisfactory' Test Report for samples of materials to be incorporated into project. 2. Acceptance Criteria: Mfg. Cert. of Compliance for 'Acceptance' prior to use of material. 3. Acceptance Criteria: Catalog Cuts for 'Acceptance' prior to use of material. Catalog Cut Approved ❑ Yes O No 4. Acceptance Criteria: Submit Shop Drawings for'Approval' prior to fabrication of material. 5. Acceptance Criteria: Only'Approved for Shipment', 'WSDOT Inspected' or'Fabrication Approved Decal' material shall be used. 6. Acceptance Criteria: Submit Certificate of Materials Origin to Project Engineer Office. 7. Acceptance Criteria: Request Transmitted to State Materials Laboratory for Approval Action. 8. Source Approved: 9. Approval Withheld: Submit samples for preliminary evaluation. 10. Approval Withheld: 11. Miscellaneous Acceptance Criteria. Remarks: Project Engineer Distribution ❑ Contractor ❑ Region Operations Engineer ❑ Fabrication Inspection DOT Form 350-071 EF Revised 12/2012 ❑ Region Materials ❑ State Materials Lab M/S 47365 State Materials Engineer Distribution ❑ General File ❑ Signing Inspection ❑ Other T��VhddnV10n no" '// oapa h- d. =2a1hm Request for Approval of Material Contract Number 'AG-15-118(C itv of Renton No. WW9-27-03712) FA Number SR Date 67/2016 Section / Title of Project Central Renton Sewer Interceptor Reline & Upsize County King Contractor Road Construction Northwest. Inc. Subcontractor I Insituform Technologies, LLC This form shall be completed prior to submittal. If this form is not complete at time of submittal it may be returned for information that was omitted. For assistance in completing, see Instructions and Example For WSDOT Use Only RAM # 017-1 Bid Item No. Material or Product Type Name and Location of Fabricator, Manufacturer or Pit Number Specification Reference PE QPL Code Hdqtr -QPL Code 10 11,13 14 CIPP Insituform Technologies, LLC Batesville, Mississippi 7-21.1 �? Project En r Date State Materials Engineer Date Acceptance Action Codes for use by Project Engineer and State Materials Laboratory 1. A ptance Criteria: Acceptance based upon 'S atis factory' Test Report for samples of materials to be incorporated into project 2. Acceptance Criteria: Mfg Cert. of Compliance for'Acceptance' prior to use of material. ❑ ❑ 3. Acceptance Criteria: Catalog Cuts for'Acceptance' prior to use of material. Catalog Cut Approved Ye, No 4. Acceptance Criteria: Submit Shop Drawings for 'Approval' prior to fabrication of material. 5. Acceptance Criteria: Only'Approved for Shipment'.'WSDOT Inspected' or'Fabrication Approved Decal' material shall be used. 6. Acceptance Criteria: Submit Certificate of Materials Origin to Project Engineer Office. 7. Acceptance Criteria: Request Transmitted to State Materials Laboratory for Approval Action, 8. Source Approved: 9. Approval Withheld: Submit samples for preliminary evaluation. 10. Approval Withheld: 11. Miscellaneous Acceptance Criteria. Remarks: Project Engineer Distribution ❑ Contractor ❑ Region Operations Engineer ❑ Fabrication Inspection DOT Form 350-071 EF Revised 12/2012 ❑ Region Materials ❑ State Materials Lab M/S 47365 State Materials Engineer Distribution ❑ General File ❑ Signing Inspection ❑ Other AIIIIIIEW W11111mid'al- MEW of ThErwntaUM Request for Approval of Material Contract Number FA Number SR Date A<T-15-1 1h(City of Renton No. NVIA 9-27-03712) 2./8./2016 Section / Title of Project County Central Renton Sewer Interceptor Reline & Upsize hir1L� Contractor Subcontractor Road Constniction North-west, Inc. Miles Sand & Gravel This form shall be completed prior to submittal. If this form is not complete at time of submittal it may be returned for information that was omitted. For WSDOT Use Only For assistance in completing, see Instructions and Example RAM # 017-1 Bid Material or Name and Location of Fabricator. Specification PE QPL Hdqtr QPL Item No. Product Type Manufacturer or Pit Number Reference Code Code 22 Class 4000 w/ high range Miles Sand & Gravel Pacific Kent 1-09.14(2) / Z- 23 Class 4000 w/ high range Miles Sand & Gravel Pacific, Kent 1-09.14(2) 22 Class 4000 Miles Sand & Gravel 1-09.14(2) Pacific Kent 23 Class 4000 Miles Sand & Gravel 1-09.14(2) Pacific Kent 24 Class 4000 w/ high range Miles Sand & Gravel 1-09.14(2) Pacific Kent 24 Class 4000 Miles Sand & Gravel Pacific Kent 1-09.14(2) 18 Control Density Fill Miles Sand & Gravel Pacific Kent 1-09.14(2) Project Engineer Date State Materials Engineer Date Acceptance Action Codes for use by Project Engineer and State Materials Laboratory 1. Acc tance Criteria: Acceptance based upon 'Satisfactory' Test Report for samples of materials to b&corpoialed into project. 2. Acceptance Criteria: Mfg. Cert. of Compliance for 'Acceptance' prior to use of material. 3. Acceptance Criteria: Catalog Cuts for 'Acceptance' prior to use of material, Catalog Cur Approved Yes No 4. Acceptance Criteria: Submit Shop Drawings for 'Approval' prior to fabrication of material. 5. Acceptance Criteria: Only'Approved for Shipment'. 'WSDOT Inspected' or'Fabrication Approved Decal' material shall be used. 6. Acceptance Criteria: Submit Certificate of Materials Origin to Project Engineer Office. 7. Acceptance Criteria: Request Transmitted to State Materials Laboratory for Approval Action. 8. Source Approved: 9. Approval Withheld: Submit samples for preliminary evaluation. 10. Approval Withheld: 11. Miscellaneous Acceptance Criteria. Remarks Project Engineer Distribution ❑ Contractor ❑ Region Operations Engineer ❑ Fabrication Inspection DOT Form 350-071 EF Revised 12Z2012 ❑ Region Materials ❑ State Materials Lab M/S 47365 State Materials Engineer Distribution ❑ General File ❑ Signing Inspection ❑ Other �1N1�mamb• OrtalYOe Request for Approval of Material Contract Number UAO-1 5-118(City of Renton No. WW9-27-03712 FA Number SR Date 11/3/2015 Section / Title of Project Central Renton Sewer Interceptor Reline & Upsize County King Contractor Road Construction Northwest, Inc. Subcontractor This form shall be completed prior to submittal. If this form is not complete at time of submittal it may be returned for information that was omitted. For assistance in completing, see Instructions and Example For WSDOT Use Only RAM # 001-3 Bid Item No. Material or Product7ype Name and Location of Fabricator, Manufacturer or Pit Number Specification Reference PE'QPL Code Hdqtr./QPL Code 8 Wasser MC-Aroshield Wasser High -Tech Coatings, Inc. Auburn WA' 7-05.3(5) f Project Engineer Date State Materials Engineer Date Aeceptance Action Codes for use by Project Engineer and State Materials Laboratory 1. Acceptance Criteria: Acceptance based upon 'Satisfactory' Test Report for samples of materials to be incorporated into project, 2. Acceptance Criteria: Mfg. Cert. of Compliance for'Acceptance' prior to use of material. 3. Acceptance Criteria: Catalog Cuts for'Acceptance' prior to use of material. Catalog Cut Approved ❑ Ye, ❑ No 4. Acceptance Criteria: Submit Shop Drawings for 'Approval' prior to fabrication of material. 5. Acceptance Criteria: Only 'Approved for Shipment', 'WSDOT Inspected' or 'Fabrication Approved Decal' material shall be used. 6. Acceptance Criteria: Submit Certificate of Materials Origin to Project Engineer Office. 7. Acceptance Criteria: Request Transmitted to State Materials Laboratory for Approval Action. 8. Source Approved. 9. Approval Withheld: Submit samples for preliminary evaluation. 10. Approval Withheld: 11. Miscellaneous Acceptance Criteria. Remarks: Project Engineer Distribution ❑ Contractor ❑ Region Operations Engineer ❑ Fabrication Inspection DOT Form 350-071 EF Revised 12l2012 ❑ Region Materials ❑ State Materials Lab M/S 47365 State Materials Engineer Distribution ❑ General File ❑ Signing Inspection ❑ Other Adw Tnpo-..P.M.C.. Illaidm Request for Approval of Material Contract Number FA Number SR Date --AG-15-118(City of Renton No. W W9-27-03712 9/24/2015 _ Section / Title of Project County Central Renton Sewer Interceptor Reline & Upsize King Contractor Subcontractor Road Construction Northwest, Inc. This form shall be completed prior to submittal. If this form is not complete at time of For WSDOT Use Only submittal it may be returned for information that was omitted. For assistance in completing, see Instructions and Example IRAM# Bid Material or Name and Location of Fabricator. Specification PE/QPL Hdgtr./QPL Item No. Product/Type Manufacturer or Pit Number Predl Systems _ Burnaby, BC Reference Code Code 8 84" ID Sewer Manhole 7-05 Project Engineer Date State Materials Engineer Date Acceptance Action Codes for use by Project Engineer and State Materials Laboratory 1. Acceptance Criteria: Acceptance based upon 'Satisfactory' Test Report for samples of materials to be incorporated into project. Z Acceptance Criteria: Mfg. Cert of Compliance for'Acceptance' prior to use of material. 3. Acceptance Criteria: Catalog Cuts for'Acceptance' prior to use of material. Catalog Cut Approved ❑ Yes ❑ \o 4. Acceptance Criteria: Submit Shop Drawings for 'Approval' prior to fabrication of material. 5. Acceptance Criteria: Only'Approved for Shipment'. 1NSDOT Inspected' or'Fabrication Approved Decal' material shall be used. 6. Acceptance Criteria: Submit Certificate of Materials Origin to Project Engineer Office. 7. Acceptance Criteria: Request Transmitted to State Materials Laboratory for Approval Action. & Source Approved. 9 Approval Withheld: Submit samples for preliminary evaluation. 10 Approval Withheld: 11 Miscellaneous Acceptance Criteria. Remarks: it �Ir3'lLCV.FsL ,s rb.rz THe- MN'EVSS15 L/afrVE ovLy! ALL- S�-Z3M�i�.4,L OR/C.�in�i1L Sa.B/�i`ifiL '�trl�W a i - �/ 2�1s Project Engineer Distribution ❑ Contractor ❑ Region Materials ❑ Region Operations Engineer ❑ State Materials Lab ❑ Fabrication Inspection M/S 47365 DOT Form 350-071 EF Revised 12/2012 State Materials Engineer Distribution ❑ General File ❑ Signing Inspection ❑ Other F--I Request for Approval of Material Contract Number FA Number SR Date CAG-15-1 18(City of Renton No. WW9-27-03712) 8/15/2016 Section / Title of Project County Central Renton Sewer Interceptor Reline & Upsize King Contractor Road Construction North��est. Inc. Subcontractor Corliss Resources This form shall be completed prior to submittal. If this form is not complete at time of For WSDOT Use Only submittal it may be returned for information that was omitted. For assistance in completing, see Instructions and Example RAM # 017-1 Bid Material or Name and Location of Fabricator, Specification PE/QPL Hdgtr./QPL Item No Product/Type Manufacturer or Pit Number Reference Code Code 16 CBSC Corliss Resoources Enumclaw A-44 7-08(1)C 7-08.3(1)C 16 CSTC Corliss Resoources Enumclaw A-44 16 Gravel Barrow Corliss Resoources 7-08.3(1)C Enumclaw A-44 I I Project Engineer fCZJ 4e J �� t �`�— 7° a� �� s Date kpp/ i s- i h State Materials Engineer Date I Acceptance Action Codes for use by Project Engineer and State Materials Laboratory 1. Acceptance Criteria: Acceptance based upon 'Satisfactory' Test Report for samples of materials to be incorporated into project 2 Acceptance Criteria: Mfg. Cert. of Compliance for 'Acceptance' prior to use of material. 3. Acceptance Criteria: Catalog Cuts for 'Acceptance' prior to use of material. Catalog Cut Approved ❑ Yes ❑ No 4, Acceptance Criteria: Submit Shop Drawings for 'Approval' prior to fabrication of material. 5 Acceptance Criteria: Only 'Approved for Shipment', 'WSDOT Inspected' or 'Fabrication Approved Decal' material shall be used. 6, Acceptance Criteria: Submit Certificate of Materials Origin to Project Engineer Office. 7. Acceptance Criteria: Request Transmitted to State Materials Laboratory for Approval Action. 8. Source Approved. 9. Approval Withheld: Submit samples for preliminary evaluation. 10. Approval Withheld: 11. Miscellaneous Acceptance Criteria. Remarks: Project Engineer Distribution ❑ Contractor ❑ Region Materials ❑ Region Operations Engineer ❑ State Materials Lab ❑ Fabrication Inspection M/S 47365 DOT Form 350-071 EF Revised 12/2012 State Materials Engineer Distribution ❑ General File ❑ Signing Inspection ❑ Other CORLISS RESOURCES Since 1945 P. O. BOX 487 SUMNER, WA 98390 PHONE: (253) 891-6680 F.XT #2 FAX: (253) 891-6692 ACCT: (253) 826-8384 PREPARED FOR RCNW PROJECT CENTRAL RENTON SEWER INTERCEPTOR SUNSET BLVD N & N 3RD ST RENTON, WA AGGREGATE DATA SUBMITTAL CONTENTS: GRADATION REPORTS AGGREGATE SOURCE APPROVAL PREPARED BY: STEVE CORLISS / SALES (253) 278-0237 TONV BOWMAN /QC (253) 377-8861 Monday, August 15, 2016 CONFIDENTIAL CORLISS RESOURCES Since 1945 P. O. BOX 487 SUMNER, WA 98390 PHONE: (253) 891-6680 EXT #2 FAX: (253) 891-6692 ACCT: (253) 826-8384 RCNW CENTRAL RENTON SEWER INTERCEPTOR Please post on job or where orders are placed from. SOURCE PLANT MATERIAL ENUMCLAW A-44 CSTC 5/8" Minus — 9-03.9 3 ENUMCLAW A-44 CSBC 1 %4" Minus — 9-03.9 3 ENUMCLAW A-44 4" Bank Run — 9-03.14 1 Gravel Borrow Regular rates may apply for materials not listed here or on quoted price sheet, please contact gravel sales for current pricing information. CONFIDENTIAL P.O. Box 487 CORL/SS RESOURCES 5irin. 1945 AGGREGATE TEST Sumner WA 98390 253-863-1569 REPORT fax-253-863-1568 SAMPLED: 7/21/16 REC'D: 7/21 BY: Matt W. LAB: C.R.I. SAMPLE ID# 15-250 MATERIAL: CSTC 5/8" Minus STANDARD: WSDOT SPEC #: WSDOT 9-03.9(3) Top Course SAMPLE SIZE (Ibs): 40lbs PIT: Enumclaw USAGE: Subgrade WEATHER: Sunny PLANT: Enumclaw SAMPLED AT: Enumclaw SAMPLE BLENDED?: No ROUND: SAMPLED BY: TIME: LOCATION: Stockpile FINE/COARSE SPLIT? No SIEVE/WASH SEPARATE? No FM: 0.49 OTHER: ALL WEIGHTS ARE CUMULATIVE TESTING DATE: 7/21/2016 BY: INITIAL TOTAL WT: 3949.6 1ST DRY (PRE -WASHING): 1804.5 FINAL TOTAL WT. 3604.2 SIEVE WEIGHT SIEVE WEIGHT SIEVE WEIGHT SIEVE WEIGHT SIEVE WEIGHT SIEVE WEIGHT 6" 1.75" 5/8" 8.5 410 #50 #200 359,' 5" 1.5" 112" 137.4 #16 #60 #270 4" 1.25" 3/8" #20 #80 PAN 3602.E 3" 1" 1/4" 930 4100 c 4.36 2.5" 7/8" # 4 935 4140 U: 107.44 2" 3 4" 48 #40 1 4170 1 DUSTRATIO 0.45090603 SAMPLE RESULTS SIEVE % RETAIN % PASSING MIN MAX SIEVE % RETAIN % PASSING MIN MAX 6" ## 4 49 51 66 5" #8 4" #10 3" #16 2.5" #20 2" #30 1.75" #35 1.50" #40 88 12 24 1.25" #50 1" #60 7 8" #80 3 4" 0 100 100 #100 5/8" 0 100 #140 12" 4 96 80 100 #170 3 8" #200 94 5.6 1 10.0 1 4" #270 SAND EQUIVALENCY: SINGLE FRACTURED FACE: DOUBLE FF: NO FF: NOTES: CONFORMS S.E. 65%-- SINGLE FRACTURED FACE 99% 1 .. VERIFIED BY: QC Mgr. ENTERED BY: Tony Bowman Lead Technician DATE: 7/21/2016 CORL/SS RESOURCES - Singe1943 AGGREGATE TEST P.O. Box 487 fifffba Sumner WA 98390 253-863-1569 REPORT fax 253 863 1568 SAMPLED: 6/21/16 REC'D: 6/21 BY: T. Bowman LAB: C.R.I. SAMPLE ID# 15-219 MATERIAL: CSBC 1 1/4" Minus STANDARD: WSDOT SPEC #: WSDOT 9-03.9(3) Base Course SAMPLE SIZE (Ibs): 50lbs PIT: Enumclaw USAGE: Subgrade WEATHER: Sunny PLANT: Enumclaw SAMPLED AT: Enumclaw SAMPLE BLENDED?: No ROUND: SAMPLED BY: T. Bowman TIME: 11:30am LOCATION: Stockpile FINE/COARSE SPLIT? No I SIEVE/WASH SEPARATE? - FM: 0.69 OTHER: ALL WEIGHTS ARE CUMULATIVE TESTING DATE: 6/21/2016 BY: INITIAL TOTAL WT: 14406.4 1ST DRY (PRE-WASHING) 14104.2 FINAL TOTAL WT: 14104.2 SIEVE WEIGHT SIEVE WEIGHT SIEVE WEIGHT SIEVE WEIGHT SIEVE WEIGHT SIEVE WEIGHT 6" 1.7S" 5/8" 3858.9 #10 450 #200 13810.2 5" 1.5" 1/2" 6414.0 #16 #60 #270 4" 1.25" u.0 3/8" #20 #80 PAN 14080.2 3" 1" 251 8 1/4" #30 #100 4.55 2.5" 11 7/8" #4 #35 #140 u 112.57 2" 3 4" 1742 F #8 #40 1 #170 1 DusTRATiO 0.31474146 SAMPLE RESULTS SIEVE % RETAIN % PASSING MIN MAX SIEVE % RETAIN % PASSING MIN MAX 6" # 4 69 31 25 45 5" #8 4" #10 3" #16 2.5" #20 2" #30 1.75" #35 1.50" #40 93 7 18 1.25" 0 100 100 #50 1" 2 98 80 100 #60 7 8" #80 3 4" 12 88 #100 5 8" 27 73 80 #140 12" 45 55 #170 3 8" #200 98 2.1 1 7.5 1/4" 1 1 #270 SAND EQUIVALENCY: SINGLE FRACTURED FACE: DOUBLE FF: NO FF: NOTES: CONFORMS S.E. 62% SINGLE FRACTURED FACE 99% VERIFIED BY: QC Mgr. ENTERED BY: Tony Bowman Lead Technician DATE: 6/21/2016 �,„�r rq,� P.O. Box 487 CORLISS RESOURCES AGGREGATE TEST Sumner WA 98390 253-863-1S69 REPORT fax-2S3-863-1568 SAMPLED: 7/5/16 REC'D: 7/5 BY: Matt W. LAB: C.R.I. SAMPLE ID4 15-232 MATERIAL: 4" Bank Run STANDARD: WSDOT SPEC #: WSDOT 9-03.14(1) Gravel Borrow SAMPLE SIZE (Ibs): 50lbs PIT: Enumclaw USAGE: - WEATHER: Overcast PLANT: Enumclaw SAMPLED AT: Enumclaw SAMPLE BLENDED?: No ROUND: SAMPLED BY: Matt W. TIME: 8am LOCATION: Stockpile FINE/COARSE SPLIT? No SIEVE/WASH SEPARATE? No FM: 0.34 OTHER: ALL WEIGHTS ARE CUMULATIVE TESTING DATE: 7/5/2016 1 BY: INITIAL TOTAL WT: 15453A 1ST DRY (PRE -WASHING) 14837 FINAL TOTAL WT: 14482.6 SIEVE WEIGHT SIEVE WEIGHT SIEVE WEIGHT SIEVE WEIGHT SIEVE WEIGHT SIEVE WEIGHT 6" 1.75" 5/8" #10 950 #200 11,162.2 5" 1.5" 112" 37414 #16 #60 4270 4" 0.0 1.25" 3/8" #20 #80 PAN 14182.6 3" 1" 1/4" #30 #100 UC73.85 2.S" 7/8" #4 5098.0 #35 #140 a 93.88 2" 1732.6 1 3 4" 1 t18 #40 1 1 4170 ousrRAno 0.35546282 SAMPLE RESULTS SIEVE % RETAIN % PASSING MIN MAX SIEVE % RETAIN % PASSING MIN MAX 6" # 4 34 66 80 5" #8 4" 0 100 #10 3" #16 2.5" 1 #20 2" 12 $$ 1 100 #30 1.75" #35 1.50" #40 93 7 30 1.25" #50 1" 13 $7 #60 7 8" 1 1 #80 3 4" 21 79 #100 5 8" #140 1 2" 25 75 #170 3 8" #200 97 2.5 7.0 1 4" #270 SAND EQUIVALENCY: I SINGLE FRACTURED FACE: DOUBLE FF: NO FF: NOTES: CONFORMS S.E.71% VERIFIED BY: \ QC Mgr. ENTERED BY: Tony Bowman Lead Technician DATE: 7/5/2016 Aggregate Source Approval Report page i of i 411110111► 0 Department of Transportationshinizilori State WSDOT MATERIALS LAB 05/02/2014 Aggregate Source Approval Report Owner: Corliss Resources, Inc. Aggregate Source: PS-A-44 Lessee: Known as: Enumclaw Pit Located in: SE 1/4 SW 1/4 SEC 20; NW 1/4 NW 1/4 SEC 29 Section 20,29, T20N R7E County: King Remarks: Degradation factor for Concrete Aggregates: 40 (5/02/14 GSW) Pit Run Materials: At the discretion of the Project Engineer, preliminary samples for Gradation and Sand Equivalent tests may be performed to determine if the material does in fact meet the specification for the intended use: Backfill for Rock Wall Backfill for Sand Drains Bedding Material for Rigid Pipe Bedding Material for Thermoplastic Pipe Foundation Material for Classes A. B or C Gravel Backfill for Drains and Drywells Gravel Backfill for Foundation Class B Gravel Backfill for Pipe Zone Bedding Gravel Backfill for Walls Gravel Borrow Sand Drainage Blanket Select or Common Borrow No Preliminary Tests are required to be performed by the State Materials Lab Gravel Base: Test Date: 09/29/2009 Expiration Date: Drainage Free R Value 69 Swell Pressure 0 Contact the Regional Materials Office to request PRELIMINARY SAMPLES be acquired. Evaluation and approval of this site as a source of GRAVEL BASE is required prior to use. Mineral Agg. and Surfacing: Test Date: 04/14/2014 Expiration Date: 04/14/2019 Absorption Apparent Sp G Bulk Sp G. (SSD): 2.677 Bulk Sp G Deg 59 LA 17 Currently approved a, a sz)urce of aggregate for ATB Ballast BST Crushed Cover Stone BST Crushed Screenings Crushed Surfacing Base Course Crushed Surfacing Key Stone Crushed Surfacing Top Course Gravel Backfili for Foundation Class A HMA Other Courses HMA Wearing Course Maintenance Rock Permeable Ballast Acceptance tests need to be performed as necessary Portland Cement Concrete Aggregates: Test Date: 05/02/2014 Expiration Date: 05/02/2019 ASR - 14 Day 0 031 ASR - One Year CCA Absorption 1 61 CCA Sp G 2 676 FCA Absorption 2 12 FCA Organics 2 FCA Sp G 2 648 LA 16 Mortar Strength Petrographic Analysis. Currently approved for: Coarse Concrete Aggregates Fine Concrete Aggregates Acceptance tests need to be performed as necessary IRiprap and Quarry Spalls: Test Date: Expiration Date: Please see Remarks for Riprap and Quarry Spalls results. Contact the Regional Materials Office to request PRELIMINARY SAMPLES be acquired. Evaluation and approval of this site as a source of RIP RAP AND QUARRY SPALLS is required prior to use. Distribution: Physical Testing Project Engineer_ __- Region Operations Region Materials Aggregate Source Approval System http://www.wsdot.wa.gov/biz/tiiats'ASA 'ASA Report.cftn?prefix=A&pit_no=44 5/2i2014 Washington State VAr Department of Transportation Request for Approval of Material Contract Number FA Number SR Date CAG-15-118 6/ 13/2016 Section / Title of Project County Central Renton Sewer Interceptor Reline & Upsize King Contractor Subcontractor Road Construction Northwest, Inc. This form shall be completed prior to submittal. If this form is not complete at time of submittal it may be returned for information that was omitted. For WSDOT Use Only For assistance in completing, see Instructions and Example RAM #008 Bid Material or Name and Location of Fabricator, Specification PE/QPL Hdgtr./QPL Item No. Product/Type Manufacturer or Pit Number Reference Code Code 3 Trench Excavation Safety stems Note 5, sht 4 of Plans Project ngi eer Date State Materials Engineer Date Acceptance Action Codes for us by Project Engineer and State Materials Laboratory 1. ceptance Criteria: Acceptance based upon 'Satisfactory' Test Report for samples of materials to be incorporated into project. 2. Acceptance Criteria: Mfg. Cert. of Compliance for'Acceptance' prior to use of material. 3. Acceptance Criteria: Catalog Cuts for 'Acceptance' prior to use of material. Catalog Cut Approved ❑ Yes ❑ No 4. Acceptance Criteria: Submit Shop Drawings for 'Approval' prior to fabrication of material. 5. Acceptance Criteria: Only'Approved for Shipment', 'WSDOT Inspected' or'Fabrication Approved Decal' material shall be used. 6. Acceptance Criteria: Submit Certificate of Materials Origin to Project Engineer Office. 7. Acceptance Criteria: Request Transmitted to State Materials Laboratory for Approval Action. 8. Source Approved: g. Approval Withheld: Submit samples for preliminary evaluation. 10. Approval Withheld: 11. Miscellaneous Acceptance Criteria. Remarks: A t�, zrHee-, v4 PLAN �[>.e -771 A%7l '_ �!/+� /E%2 ji?,�[c.�s -zWd G STq�7P Xji �12iI�S.o w! �ifKq/A/��Ie % /✓o7T 5 af= �fl�'T¢ /r Sv,.s -✓ /2,c.vc./.s 4-,..aTi'1Z Project Engineer Distribution ❑ Contractor ❑ Region Operations Engineer ❑ Fabrication Inspection DOT Form 350-071 EF Revised 12/2012 ❑ Region Materials ❑ State Materials Lab M/S 47365 State Materials Engineer Distribution ❑ General File ❑ Signing Inspection ❑ Other Ljtdw esc,`r vy q,-I,jDAILY INSPECTION DIARY DAY: I-L,,,,A,,5 L I DATE: �/9j /16 WORK PERIOD: a.m./p.m. to WEATHER: TEMP. MAX OF MIN OF PRECIPITATION: WORK ACCOMPLISHED TODAY: Ce,,+.c,) =v,,+& -c cArer- Cxr � C H titer-cty�' to �^ o� Ex�ed yes do• �, .�; a w.�-, -�--= a.m./p.m. REPORT Cnw ; wS*zued `is L F Z `t " PVC- dew ti- P" 1Pe-, D Lked A G%4-- 5U,-4,,,{ , 541,1 4.A fie- Q a A e+We e&,. ` -t, e-- Co"O U.o�E �' `�•. S�-vr,.c�-w�L �.. a�y f-Sc' ct o-t= 'j'L�e r`i " /�� sfit e-1 P - Pe- e, CL b0'- 3 D G. F �a.st o-� S� N �i(�t�'i, T�-,c 4 ►'A e ok-+ J- S' c clt ,F *-,-,t r}-v e "e-L.. Ip e- LA.-- 4 d V ve,c't--t CA" 'r e 4fi-e�i A fi'° Q lea Cvew +-l�s- ce �, µ-. v� U�1.0 d ty C�- -tv UP a \-j r e w,-w c 1't� UL-,- _ cw T Cru,, 0, t t -t-va,-kFc ez,�,+Vo) re- 5 6 ,4 0. VVl\11XC1\ lvlx 0lvllt%luni; llvarzulun alunAlunn DATE: 12! % 2-o/ a, ` .. .. .. . . .............................:.........:...............................................................................:.......................................:............... ..................... :...................................... . . . .. .. .. .. . :...!4 ! ......... ......... .. .. .. .. .. .. ..:.. .. .. ..:.... .. .. .. .. .. .. . . ........ ii c . -7.7.o eaVii ... /�. .A.r .. L 1AS.. t�•," . ,�l�c .. ... .t.[. ,yam . /. �... c' y= .,arc . �?f"�....... . :.. i. ... ►� .. fir:kc. . A/an-ti . . . . . . . . . . . . . . . . . . . . . . . . . . . .. /..H► �! ...r�..7's... �4 r.? j...T-/.7'- ........... .. . ...... rr ...... ...... s.....�s� . z......................................................... .. .. .. . . ...................:................................................................................................ . . . . . . : . . . : . . . . . . . . . . . . . . . ,. '.'"'Trr..�.....r�'?-.....�s�tti. .............. ..............:I"t'...... K..... a...`...��K,,..'.........:............... ............. ' c/ ?4�i ikle T .. i�� _ ...�-c `T7.?�kc'l,�o. ,.:/`� Ti. r�,�.. .. .. .. %!Y? .. =.. t .. �-a� . Lr�rh phi fin . ..... .. .. .. .. .. ....... . . ... ... ... ... ... ... ... ... ... ... ... ...1..... ... -... ................. . ................... ......... ......... ........4 ,/ .! ... ..... .................. ................... ............. ........... ....... ............. ............. .. . . ....................................... ................... .......... ....... ................... .... ................... ................... ................... ................... ........... ....... ................... ................... ...................................... ....................................... ....................................... ...................... ............... ....................................... ......... ......... ............................. T% :C 4A'A ........ . ..... ...... .............. ................... ................... LAC ......... .............. .................. ................... ............ ...................... ................. ..... ... ................... ................... ........... .. ................... ................... ... .... ................... ....................................... ..................... ..... ....... ....................................... ....................................... ........ ............ .. .............. .................... ........ ... ...... ............ ......... . ................ '00000, ................... .... ... ....... .......... .......... A� A ..................... ............................................................................................ ...... ......... ........... .... .... ........... .................. .. . .. ........ ...................................... .............. .............. ............... ....................................... .............. .... ................... ................ ................... ...................................... ...... .............. .......... ............ .......... ......... .................... ..................... ........................... .............. .......... ... . .......... ................ ......... AAA . . . . . . . . . . ..................... . ................. ................... ................... ............. - ............ ................... ......... ............ ..... ......... ................................................ 4 PrA E lr-) C. .......... ................... .................. ................... ................... ................... ................... ................... ............... ................... ................... ................... ................... ................... ................... .......... ................... y c 80' N —REMOVE EX 72" DIA BRICK - 1 — MH AND REPLACE WITH - NEW 84" DIA SMH 1968. r / M Oa Z _ t- •c .�- r n-'° # n/ "// --- ci r; �/ j -./. iy--. i- _' PER DETAIL 1/C-2 PK2 STA 1+00 OFFSETVRTN N 181163.90 no - SEE NOTE 5 E 130374.48 I 2 AB-2 TYP STA 1+00 9 N 181167,65 TYPE 1303802.054.0 o To zo ti SEE DETAIL 1/C-2 2a" SS PVC Scare In Feet AB-1 AS REQUIRED 1+50 fl L GB-15 ° �' -/ �� , .�" 8 TYP RZ VO 5CP SS -- - } 3 \ - _ EX 15" CONC SS EX 24" VCP SS, SEE DWG C-3 FOR - BNSF PREMISES: \/ L r \ / / SEWER RELINE REQUIREMENTS WORK SHALL COMPLY WITH THE PROJECT'S BNSF TEMPORARY OCCUPANCY PERMIT AND THE PROTECT EXIST UTILITIES, TYP EXISTING RIGHT OF WAY REQUIREMENTS NOTED ON 2c �c AC THESE PLANS AND IN THE m ENTERPRISE CAR RENTAL / SPECIFICATIONS, SEE NOTE 4. 65 CONSTRUCTION NOTES: O1 REMOVE AND REPLACE PAVEMENT PER RENTON STD PLANS 110 AND 110.1. EXISTING PAVEMENT THICKNESS IS ANTICIPATED TO BE 6" OF ASPHALT OVER 4" OF 60 CONCRETE. NEW HMA SHALL MATCH TOTAL THICKNESS OF EXISTING PAVEMENT (-10"), CONCRETE BASE SHALL NOT BE REPLACED 2O REMOVE AND REPLACE SIDEWALK, CURB AND GUTTER, 55 AND PAVEMENT PER RENTON STD PLANS 102 AND 103, AND PER WSDOT STD PLAN F-10.12-02. O3 REMOVE EXISTING 6' CHAIN LINK FENCE AS NECESSARY AND REINSTALLIREPLACE FENCE TO MATCH EXISTING. 50 4O REMOVE AND REINSTALL DISTURBED RAILROAD TIES BETWEEN BARK AND GRAVEL LOT TO MATCH EXISTING. OS REMOVE SOIL IN 3' LAYERS AROUND MH TO PREVENT 45 SOIL LOADING ON ONE SIDE OF THE MH. f tL O6 CUT UPSIZED PENETRATION WITH POWER SAW, NO Z HAMMERING ALLOWED. CONNECT NEW SEWER PIPING 0 4111 WITH NPC WATERSTOP GROUTING RING, OR EQUAL. FILL Q VOID WITH NON SHRINK GROUT. W O7 REMOVE AND REPLACE MH CHANNEL PER SPECIAL J w PROVISIONS SECTION 7-26, EXCEPT EXTEND CHANNEL 35 HEIGHT TO TOP OF 24" SS. O REMOVE EXISTING VEGETATION AS NECESSARY AND REPLACE WITH SEED, FERTILIZER AND MULCH. O9 REMOVE AND REPLACE DISTURBED GRAVEL AND BARK 30 TO MATCH EXISTING. 10 TRENCH BACKFILL SHALL BE CSTC FOR ALL SEWER UNDER PAVEMENT. NATIVE MATERIAL FOR TRENCH 25 BACKFILL MAY BE USED ELSEWHERE PROVIDED IT MEETS THE REQUIREMENTS OF GRAVEL BORROW PER WSDOT SECTION 9-03.14(1). INSTALL UNDERGROUND WARNING TAPE IN TRENCH PER SPECIAL PROVISIONS SECTION 7-08.3(3)8. 20 11 CONSTRUCTION C/L EQUALS PIPE C/L. 12 REPLACE CHANNELVATION MARKERS PER RENTON STD PLANS H007, 109 AND 109.1. 15 EX"18" PVC 35 T . -/ -- - --7-F_x6O"CIA / 1 SMH 4692 SADDLE TYPE f TYP 8 6" r MIN STA 2+27t r r MIN MIN�GB-14 PK 1 `N181151.07 E 1303866.48 TYP 5 r l I EL 53.98/ I EX 12 VCP SS AND . SMH PLUGGED 11 CONSTRUCTION /I3 W _ rr /� CENTERLINE !b - — -_ - _ _ ---- AND,ABANDONED ' / - \l AI' �� BELDW GRADE 2 ca ; 11 l ' • Lll 65 NOTES: 1. CONTRACTOR SHALL PREPARE AND SUBMIT FOR REVIEW AND APPROVAL A TRAFFIC CONTROL PLAN FOR WORK IN SUNSET BLVD N. THE TRAFFIC CONTROL PLAN SHALL BE APPROVED BY THE ENGINEER PRIOR TO so BEGINNING ANY WORK IN SUNSET BLVD N AND BE IN ACCORDANCE WITH THE CITY APPROVED ROW PERMIT TO BE OBTAINED BY THE CONTRACTOR SEE DWG G-2 FOR ADDITIONAL TRAFFIC CONTROL NOTES. 2 SEE SPECIAL PROVISIONS SECTION 7-27 FOR TEMPORARY SEWER BYPASS 55 PUMPING/SYSTEMS REQUIREMENTS. 3. REFER TO GEOTECHNICAL ENGINEERING REPORT (AVAILABLE FOR REFERENCE ONLY) FOR INFORMATION ON PROJECT SOIL BORINGS AB-1, AB-2, GB-14 AND GB-15. SD 4. SEE GENERAL BNSF NOTES AND REQUIREMENTS ON DWG G-2. 5, ALL MANHOLE EXCAVATION SHALL HAVE AN ENGINEERED SHORING PLAN (PE SEALED) APPROVED BY BNSF PRIOR TO CONSTRUCTION. CONTRACTOR SHALL SUBMIT SHORING PLAN THREE WEEKS PRIOR TO CONSTRUCTION FOR 45 ENGINEER AND BNSF APPROVAL. SEE WSDOT SECTION 2-09 FOR STRUCTURAL SHORING REQUIREMENTS. 6. SEE GENERAL CONSTRUCTION SEQUENCE NOTES ON DWG G-2. 7. THE LOCATION OF EXISTING UTILITIES SHOWN ARE APPROXIMATE; TAKEN 40 FROM UTILITY LOCATE MARKINGS AND/OR AVAILABLE RECORD DRAWINGS. DEPTHS OF WATER, NATURAL GAS, AND UNDERGROUND POWER, TELEPHONE, CABLE, AND/OR FIBER OPTIC MAINS AND SERVICES ARE UNKNOWN. EXACT LOCATIONS MUST BE DETERMINED BY THE CONTRACTOR PRIOR TO AND DURING CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE 35 FOR ANY AND ALL DAMAGES CAUSED DUE TO FAILURE TO LOCATE AND PRESERVE ANY/ALL EXISTING UTILITIES. 8. EROSION CONTROL MEASURES SHALL BE PROVIDEDAMPLEMENTED AS REQD AND APPROPRIATE IN ACCORDANCE WITH THE EROSION CONTROL NOTES ON DWG G-2 AND APPLICABLE CITY OF RENTON STD PLANS. 30 9. REMOVE AND DISPOSE OF EXISTING SEWER PIPE, MANHOLE AND APPURTENANCES IN ACCORDANCE WITH THE SPECIFICATIONS. 10. THE LOCATION AND DEPTH OF EXISTING SEWER, MANHOLES AND RELATED Y5 APPURTENANCES ARE APPROXIMATE AND SHALL BE FIELD VERIFIED/LOCATED BY THE CONTRACTOR TO RECONNECT AND/OR TIE-IN NEW AND EXISTING SYSTEM FACILITIES. ADJUSTMENTS SHALL BE MADE AS REQUIRED AND NECESSARY. 11. ALL EXCAVATIONS SHALL BE CLOSED UP OR PROTECTED AT THE END OF 20 EACH WORK DAY. 12. SEE SPECIAL PROVISIONS SECTION 1.08.13 Call 48 Hours FOR SPECIFIC WORK CONSTRAINTS. Before You Dig is 1-800-424-5555 UNDERGROUND SERVICE BHC Consultants, LLC 1601 Fitlh Avenue, Suite 500 « y0 k s - >Q KPc HORIZ: 1 "=10'-D' ^�"^ .�rw�«, CITY OF n,< seame,vva5r nfltGnaetol VERT. , =5-o RELINE & CENTRAL RENTON SEWER INTERCEPTOR Y 2o1s J N T. wMrtEHOUSE. P.E UPSIZE PROJECT CONSULTANTS RENTON 20066.55005.3408 (fax) *e ws.f e� + 9 ¢c ISSUED FOR BID TJw 05/2015 JSK o�51MON DATUM SEATTLE TACOM, viww.btleeonsultarlts.Gom 0g. cr srea�R,E" Fss ie0. J. 1(RESMEL. P.E. Public works Dept. SEWER UPSIZE PLAN & PROFILE mot✓— j '9.N^ice 5�1yll7 ,�"U NO. REVISION BY DATE APPR p. DDORN, P.E. �a � 4 '6 RT I- 00 0 r- N d �' O 50 1DO Scale 0 Fee! SCHEDULE - CURED IN PLACE PIPE FOR SANITARY SEWER STREET UPSTREAM APPROX DEPTH TO DOWNSTREAM APPROX DEPTH TO EXISTING PIPE APPROX APPROX* 1 MANHOLE PIPE INVERT MANHOLE PIPE INVERT MATERIAL PIPE SIZE RUN LENGTH LATERALS TO REINSTATE N 4TH ST 1968 11.3 FT 1967 4A FT VITRIFIED CLAY 24" 456 FT 3 N 4TH ST 1967 4.8 FT 2019 5.6 FT VITRIFIED CLAY 24" 203 FT 0 TOTAL 24" 659 FT 3 BHC Consultants, LLC 1601 Fifth Avenue, Suite 500 Seattle Washington 98101 CONSUL ANTS 2065053400 206.505-3406 (fax) SEATTLE TACOMA w bhcconsuftants com CIPP PLAN AND SCHEDULE PLAN SCALE. 1' - W-T DES Wy Y S. n H PSIS s G TEtb 2`O ISSUED FOR 810 �1y�15 '� AL N0. REVISION T. WIp TEHOUSE. I R SI4/ON TJW 05/2015 JSK J KRESK1. P E. BY DATE APPR R. DORN. a.E. A$ NOTED wu`on".'�°Hww. DATUM NOTES: 1. CONTRACTOR SHALL PREPARE AND SUBMIT FOR REVIEW AND APPROVAL A TRAFFIC CONTROL PLAN FOR WORK IN N 4TH ST. THE TRAFFIC CONTROL PLAN SHALL BE APPROVED BE THE ENGINEER PRIOR TO BEGINNING ANY WORK IN N 4TH ST AND BE IN ACCORDANCE WITH THE CITY APPROVED ROW PERMIT TO BE OBTAINED BY THE CONTRACTOR 2 SEE SPECIAL PROVISIONS SECTION 7-27 FOR TEMPORARY SEWER BYPASS PUMPING/SYSTEMS REQUIREMENTS. 3. EROSION CONTROL MEASURES SHALL BE PROVIDEDlIMPLIMENTED AS REQD AND APPROPRIATE IN ACCORDANCE WITH THE EROSION CONTROL NOTES ON DWG G-2 AND APPLICABLE CITY OF RENTON STD PLANS 4. SEE GENERAL BNSF NOTES AND REQUIREMENTS ON DWG G-2 5. SEE SPECIAL PROVISIONS SECTION 1-08.13 FOR SPECIFIC WORK CONSTRAINTS REPLACE TYPE C TRAFFIC CURB TO MATCH EX PER RENTON STD PLAN H007 CONSTRUCTION NOTES: ONEW SMH 1968 SHALL BE INSTALLED PRIOR TO BEGINNING CIPP WORK. SEE GENERAL CONSTRUCTION SEQUENCE NOTES ON DWG G-2 O2 QUANTITY, LOCATION AND DEPTH OF EXISTING SIDE SEWERS ARE UNKNOWN. SIDE SEWERS SHOWN FOR ILLUSTRATION PURPOSES ONLY. CONTRACTOR SHALL FIELD LOCATE EXISTING SIDE SEWERS AND RESTORE SERVICE CONNECTION AFTER INSTALLATION OF CIPP AS SPECIFIED REMOVE 72" DIA MANHOLE TOP FOR INSTALLATION OF CIPP, REINSTALL AND ROTATE APPROX 135° CCW AS APPROVED BY THE CITY IN THE FIELD REPLACE YELLOW PAVEMENT MARKING TO MATCH EX PROTECT EX UTILITY COVER, REINSTALL TO MATCH EX AS READ REPLACE CHANNELIZATION MARKERS PER RENTON STD PLANS H007 AND 109.1 REMOVE AND REPLACE 4 CONC PANELS PER RENTON STD PLAN 111' APPROX SIZE=10'x10'x12" THICK EACH PANEL MANHOLE AND PAVEMENT RESTORATION (LOOKING WEST) DETAIL NTS Call 48 Hours Before You Dig 1-800-424-5555 UNDERGROUND SERVICE CITY OF CENTRAL RENTON SEWER INTERCEPTOR iAr zo15 1K RENTON RELINE & UPSIZE PROJECT Public Woks Dept. SEWER RELINE PLAN & DETAILS C—.3