Loading...
HomeMy WebLinkAboutWWP273831 (2)J �SW tr,rad`l 27th St �5W Q q v c � W W aNE,3�d•St , �O m a .M �N e oo kry t o`� PUO m PROJECT -LOCATION— CL N` CO -SE 168th St a — C} eke,: SW 41st St BiC9 PO i SM4-3 rd�St ,• g.Ca<<�� CIT-iv - Q Cascade Interceptor Rehabilitation Phase 11 Vicinity Map CITY OF RENTON CALL FOR BIDS Cascade Interceptor Rehabilitation Phase II WWP-27-03831 Sealed bids will be received until 11:30 a.m. Tuesday, August 4, 2015 at the City Clerk's office, 7th floor and will be opened and publicly read in conference room Conference Room 511 on the 51h floor, Renton City Hall, 1055 South Grady Way, Renton WA 98057. The work to be performed within 45 working days from the Notice to Proceed Date under this contract shall include, but not be limited to: The rehabilitation of a portion of Renton's sanitary sewer system through the installation of approximately 605 linear feet of 14" Cured in Place Pipe (CIPP), 265 linear feet of 18" CIPP, 979 linear feet of 21" CIPP, 2,935 linear feet of 24" CIPP, reinstatement of 2 side sewer laterals, and the rehabilitation of 20 concrete manholes. Manhole depths range from 6' to 28'. Work will include pre -installation inspection and cleaning of the sewer facilities as well as post installation inspection and the bypass pumping of flows necessary for each phase of the work. Any contractor connected with this project shall comply with all Federal, State, County, and City codes and regulations applicable to such work and perform the work in accordance with the plans and specifications of this contract document. The City reserves the right to reject any and/or all bids and to waive any and/or all informalities Bid documents will be available July 21, 2015. Plans, specifications, addenda, and the plan holders list for this project are available on-line through Builders Exchange of Washington, Inc., at http://www.bxwa.com. Click on "bxwa.com"; "Posted Projects", "Public Works", "City of Renton", "Projects Bidding". (Note: Bidders are encouraged to "Register as a Bidder," in order to receive automatic email notification of future addenda and to be placed on the "Bidders List.") If a bidder has any questions regarding the project, please contact the Project Manager, John Hobson, at 1055 South Grady Way, Renton, WA 98057 or (425) 430-7279. A certified check or bid bond in the amount of five percent (5%) of the total of each bid must accompany each bid. The City's Fair Practices, Non -Discrimination, and Americans with Disability Act Policies shall apply. Jason Seth, City Clerk Published: Daily Journal of Commerce July 21, 2015 Daily Journal of Commerce July 28, 2015 CITY OF RENTON PUBLIC WORKS DEPARTMENT CASCADE INTERCEPTOR REHABILITATION PHASE II TOTAL PRICE OF BOTH SCHEDULES WILL BE USED TO DETERMINE SUCCESSFUL LOW RESPONSIVE BIDDER (Note: The bid price shall be stated in figures only, in terms of the units indicated and as to a total amount. In the event of errors or where conflict occurs, the unit price bid shall govern. Illegible figures will invalidate the bid) SEE SECTION 1-09.14 OF THE SPECIAL PROVISIONS FOR INFORMATION ON BID ITEMS. ITE APPROX. ITEM UNIT PRICE AMOUNT . NOQUANTITY Dollars Cents. Dollars Cents. 1 1 Mobilization & Demobilization $ $ Lump Sum per Lump Sum 2 1 Traffic Control $ $ Lump Sum per Lump Sum 3 4,784 Pre -Installation Cleaning and Inspection S $ per Linear Foot Linear Foot 4 605 Install 14" CIPP $ $ per Linear Foot Linear Foot 5 265 Install 18" CIPP $ $ per Linear Foot Linear Foot 6 979 Install 21" CIPP $ $ per Linear Foot Linear Foot 7 2,935 Install 24" CIPP $ $ Linear Foot per Linear Foot 8 2 Reinstate Side Sewer Taps $ $ per Each Each 9 4,784 Post Installation Inspection $ $ per Linear Foot Linear Foot 10 4 Sewer Manhole Rehabilitation 0' to 10' deep $ per Each Each 11 10 Sewer Manhole Rehabilitation 1 1' to 20' deep $ $ per Each Each 12 6 Sewer Manhole Rehabilitation 21' to 30' deep $ $ per Each Each CITY OF RENTON PUBLIC WORKS DEPARTMENT CASCADE INTERCEPTOR REHABILITATION PHASE II TOTAL PRICE OF BOTH SCHEDULES WILL BE USED TO DETERMINE SUCCESSFUL LOW RESPONSIVE BIDDER (Note: The bid price shall be stated in figures only, in terms of the units indicated and as to a total amount. In the event of errors or where conflict occurs, the unit price bid shall govern. Illegible figures will invalidate the bid) SEE SECTION 1-09.14 OF THE SPECIAL PROVISIONS FOR INFORMATION ON BID ITEMS. ITE . NOQUANTITY APPROX. ITEM UNIT PRICE Dollars Cents. AMOUNT Dollars Cents. Subtotal 9.5% Sales Tax Total S S $ Page 1 of 17 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 7/13/2015 County Trade Job Classification Wage lHoliday Overtime Note King Asbestos Abatement Workers Journey Level $42.67 5D 1 H King Boilermakers Journey Level $64.29 5N 1C King Brick Mason Brick And Block Finisher $44.46 5A 1M King Brick Mason Journey Level $51.32 5A 1M King Brick Mason Pointer -Caulker -Cleaner $51.32 5A 1M King Building Service Employees Janitor $21.29 5S 2F King Building Service Employees Traveling Waxer/Shampooer $21.70 5S 2F King Building Service Employees Window Cleaner (Non -Scaffold) $24.94 5S 2F King Building Service Employees Window Cleaner (Scaffold) $25.80 5S 2F King Cabinet Makers (In Shop) Journey Level $22.74 1 King Carpenters Acoustical Worker $52.32 5D 4C King Carpenters Bridge, Dock And Wharf Carpenters $52.32 5D 4C King Carpenters Carpenter $52.32 5D 4C King Carpenters Carpenters on Stationary Tools $52.45 5D 4C King Carpenters Creosoted Material $52.42 5D 4C King Carpenters Floor Finisher $52.32 5D 4C King Carpenters Floor Layer $52.32 5D 4C King Carpenters Scaffold Erector $52.32 5D 4C King Cement Masons Journey Level $52.38 7A 1M King Divers Et Tenders Diver $105.37 5D 4C 8A King Divers Et Tenders Diver On Standby $59.50 5D 4C King Divers Et Tenders Diver Tender $54.82 5D 4C King Divers Et Tenders Surface Rcv Et Rov Operator $54.82 5D 4C King Divers Et Tenders Surface Rcv Et Rov Operator Tender $51.07 5A 4C King Dredge Workers Assistant Engineer $54.75 5D 3F King Dredge Workers Assistant Mate (Deckhand) $54.33 5D 3F littps://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015 Page 2 of 17 King Dredge Workers Boatmen $54.75 5D 3F King Dredge Workers Engineer Welder $55.791 5D 3F King Dredge Workers Leverman, Hydraulic $56.92 5D 3F King Dredge Workers Mates $54.75 5D 3F King Dredge Workers Oiler $54.33 5D 3F King Drywall Applicator Journey Level $52.32 5D 1H King Drywall Tapers Journey Level $52.37 5P 1E King Electrical Fixture Maintenance Journey Level $26.59 5L 1 E Workers King Electricians - Inside Cable Splicer $66.76 7C 4E King Electricians - Inside Cable Splicer (tunnel) $71.67 7C 4E King Electricians - Inside Certified Welder $64.54 7C 4E King Electricians - Inside Certified Welder (tunnel) $69.22 7C 4E King Electricians - Inside Construction Stock Person $37.19 7C 4E King Electricians - Inside Journey Level $62.30 7C 4E King Electricians - Inside Journey Level (tunnel) $66.76 7C 4E King Electricians - Motor Shop Craftsman $15.37 1 King Electricians - Motor Shop Journey Level $14.69 1 King Electricians - Powerline Construction Cable Splicer $69.95 5A 4D King Electricians - Powerline Construction Certified Line Welder $63.97 5A 4D King Electricians - Powerline Construction Groundperson $43.62 5A 4D King Electricians - Powerline Construction Heavy Line Equipment Operator $63.97 5A 4D King Electricians - Powerline Construction Journey Level Lineperson $63.97 5A 4D King Electricians - Powerline Construction Line Equipment Operator $53.81 5A 4D King Electricians - Powerline Construction Pole Sprayer $63.97 5A 4D King Electricians - Powerline Construction Powderperson $47.55 5A 4D King Electronic Technicians Journey Level $31.00 1 King Elevator Constructors Mechanic $82.67 7D 4A King Elevator Constructors Mechanic In Charge $89.40 7D 4A King Fabricated Precast Concrete All Classifications - In -Factory Work Only $15.90 5B 1 R Products King Fence Erectors Fence Erector $15.18 1 King Flaggers Journey Level $36.17 7A 31 King Glaziers Journey Level $54.91 7L 1Y King Heat Et Frost Insulators And Journeyman $61.18 5J 1S Asbestos Workers King Heating Equipment Mechanics Journey Level $70.37 7F 1E King Hod Carriers Et Mason Tenders Journey Level $44.00 7A 31 King Industrial Power Vacuum Journey Level $9.47 1 https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015 Page 3 of 17 Cleaner King Inland Boatmen Boat Operator $54.57 5B 1 K King Inland Boatmen Cook $50.95 5B 1 K King Inland Boatmen Deckhand $51.19 5B 1 K King Inland Boatmen Deckhand Engineer $52.18 5B 1 K King Inland Boatmen Launch Operator $53.40 5B 1 K King Inland Boatmen Mate $53.40 5B 1 K King Inspection/Cteaning/Seating Of Cleaner Operator, Foamer Operator $31.49 1 Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Grout Truck Operator $11.48 1 Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Seating Of Head Operator $24.91 1 Sewer Er Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Technician $19.33 1 Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Tv Truck Operator $20.45 1 Sewer Et Water Systems By Remote Control King Insulation Applicators Journey Level $52.32 5D 4C King Ironworkers Journeyman $61.62 7N 10 King Laborers Air, Gas Or Electric Vibrating Screed $42.67 7A 31 King Laborers Airtrac Drill Operator $44.00 7A 31 King Laborers Ballast Regular Machine $42.67 7A 31 King Laborers Batch Weighman $36.17 7A 31 King Laborers Brick Pavers $42.67 7A 31 King Laborers Brush Cutter $42.67 7A 31 King Laborers Brush Hog Feeder $42.67 7A 31 King Laborers Burner $42.67 7A 31 King Laborers Caisson Worker $44.00 7A 31 King Laborers Carpenter Tender $42.67 7A 31 King Laborers Caulker $42.67 7A 31 King Laborers Cement Dumper -paving $43.46 7A 31 King Laborers Cement Finisher Tender $42.67 7A 31 King Laborers Change House Or Dry Shack $42.67 7A 31 King Laborers Chipping Gun (under 30 Lbs.) $42.67 7A 31 King Laborers Chipping Gun(30 Lbs. And Over) $43.46 7A 31 King Laborers Choker Setter $42.67 7A 31 King Laborers Chuck Tender $42.67 7A 31 King Laborers Clary Power Spreader $43.46 7A 31 King Laborers Clean-up Laborer $42.67 7A 31 King Laborers Concrete Dumper/chute $43.46 7A 31 https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015 Page 4 of 17 Operator King Laborers Concrete Form Stripper $42.67 7A 31 King Laborers Concrete Placement Crew $43.46 7A 31 King Laborers Concrete Saw Operator/core Driller $43.46 7A 31 King Laborers Crusher Feeder $36.171 7A 31 King Laborers Curing Laborer $42.67 7A 31 King Laborers Demolition: Wrecking Et Moving (incl. Charred Material) $42.67 7A 31 King Laborers Ditch Digger $42.67 7A 31 King Laborers Diver $44.001 7A 31 King Laborers Drill Operator (hydraulic, diamond) $43.46 7A 31 King Laborers Dry Stack Walls $42.67 7A 31 King Laborers Dump Person $42.67 7A 31 King Laborers Epoxy Technician $42.671 7A 31 King Laborers Erosion Control Worker $42.67 7A 31 King Laborers Faller Et Bucker Chain Saw $43.46 7A 31 King Laborers Fine Graders $42.67 7A 31 King Laborers Firewatch $36.17 7A 31 King Laborers Form Setter $42.67 7A 31 King Laborers Gabian Basket Builders $42.67 7A 31 King Laborers General Laborer $42.67 7A 31 King Laborers Grade Checker Et Transit Person $44.00 7A 31 King Laborers Grinders $42.67 7A 31 King Laborers Grout Machine Tender $42.67 7A 31 King Laborers Groutmen (pressure)including Post Tension Beams $43.46 7A 31 King Laborers Guardrail Erector $42.67 7A 31 King Laborers Hazardous Waste Worker (level A) $44.00 7A 31 King Laborers Hazardous Waste Worker (level B) $43.46 7A - 31 King Laborers Hazardous Waste Worker (level C) $42.67 7A 31 King Laborers High Scaler $44.00 7A 31 King Laborers Jackhammer $43.461 7A 31 King Laborers Laserbeam Operator $43.46 7A 31 King Laborers Maintenance Person $42.67 7A 31 King Laborers Manhole Builder-mudman $43.46 7A 31 King Laborers Material Yard Person $42.67 7A 31 King Laborers Motorman -dinky Locomotive $43.46 7A 31 King Laborers Nozzleman (concrete Pump, Green Cutter When Using Combination Of High Pressure Air Et Water On Concrete Et $43.46 7A 31 https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015 Page 5 of 17 Rock, Sandblast, Gunite, Shotcrete, Water Bla King Laborers Pavement Breaker $43.46 7A 31 King Laborers Pilot Car $36.17 7A 31 King Laborers Pipe Layer Lead $44.00 7A 31 King Laborers Pipe Layer/tailor $43.46 7A 31 King Laborers Pipe Pot Tender $43.46 7A 31 King Laborers Pipe Reliner $43.46 7A 31 King Laborers Pipe Wrapper $43.46 7A 31 King Laborers Pot Tender $42.67 7A 31 King Laborers Powderman $44.00 7A 31 King Laborers Powderman's Helper $42.67 7A 31 King Laborers Power Jacks $43.46 7A 31 King Laborers Railroad Spike Puller - Power $43.46 7A 31 King Laborers Raker - Asphalt $44.00 7A 31 King Laborers Re-timberman $44.00 7A 31 King Laborers Remote Equipment Operator $43.46 7A 31 King Laborers Rigger/signal Person $43.46 7A 31 King Laborers Rip Rap Person $42.67 7A 31 King Laborers Rivet Buster $43.46 7A 31 King Laborers Rodder $43.46 7A 31 King Laborers Scaffold Erector $42.67 7A 31 King Laborers Scale Person $42.67 7A 31 King Laborers Sloper (over 20") $43.46 7A 31 King Laborers Sloper Sprayer $42.67 7A 31 King Laborers Spreader (concrete) $43.46 7A 31 King Laborers Stake Hopper $42.67 7A 31 King Laborers Stock Piler $42.67 7A 31 King Laborers Tamper Et Similar Electric, Air Et Gas Operated Tools $43.46 7A 31 King Laborers Tamper (multiple & Self- propelled) $43.46 7A 31 King Laborers Timber Person - Sewer (lagger, Shorer Et Cribber) $43.46 7A 31 King Laborers Toolroom Person (at Jobsite) $42.67 7A 31 King Laborers Topper $42.67 7A 31 King Laborers Track Laborer $42.67 7A 31 King Laborers Track Liner (power) $43.46 7A 31 King Laborers Traffic Control Laborer $38.68 7A 31 8R King Laborers Traffic Control Supervisor $38.68 7A 31 8R King Laborers Truck Spotter $42.67 7A 31 King Laborers Tugger Operator $43.46 7A 31 King Laborers Tunnel Work -Compressed Air Worker 0-30 psi $64.99 7A 31 8� King Laborers Tunnel Work -Compressed Air $70.02 7A 31 8Q https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015 Page 6 of 17 Worker 30.01.44.00 psi King Laborers Tunnel Work -Compressed Air Worker 44.01-54.00 psi $73.70 7A 31 8Q King Laborers Tunnel Work -Compressed Air Worker 54.01-60.00 psi $79.40 7A 31 8M King Laborers Tunnel Work -Compressed Air Worker 60.01-64.00 psi $81.52 7A 31 8M King Laborers Tunnel Work -Compressed Air Worker 64.01-68.00 psi $86.62 7A 31 M King Laborers Tunnel Work -Compressed Air Worker 68.01-70.00 psi $88.52 7A 31 8Q King Laborers Tunnel Work -Compressed Air Worker 70.01.72.00 psi $90.52 7A 31 8M King Laborers Tunnel Work -Compressed Air Worker 72.01-74.00 psi $92.52 7A 31 8M King Laborers Tunnel Work-Guage and Lock Tender $44.10 7A 31 8M King Laborers Tunnel Work -Miner $44.10 7A 31 8Q King Laborers Vibrator $43.461 7A 31 King Laborers Vinyl Seamer $42.67 7A 31 King Laborers Watchman $32.87 7A 31 King Laborers Welder $43.46 7A 31 King Laborers Well Point Laborer $43.46 7A 31 King Laborers Window Washer/cleaner $32.87 7A 31 King Laborers - Underground Sewei General Laborer li Topman $42.67 7A 31 Et Water King Laborers - Underground Sewer Pipe Layer $43.46 7A 31 Et Water King Landscape Construction Irrigation Or Lawn Sprinkler Installers $13.56 1 King Landscape Construction Landscape Equipment Operators Or Truck Drivers $28.17 1 King Landscape Construction Landscaping or Planting Laborers $17.87 1 King Lathers Journey Level $52.32 5D 1 H King Marble Setters Journey Level $51.32 5A 1M King Metal Fabrication (In Shop) Fitter $15.86 1 King Metal Fabrication (In Shopi Laborer $9.78 1 King Metal Fabrication (In Shopl Machine Operator $13.04 1 King Metal Fabrication Iln Shop! Painter $11.10 1 King Metal Fabrication (In Shop! Welder $15.48 1 King Millwright Journey Level $53.42 5D 4C King Modular Buildings Cabinet Assembly $11.56 1 King Modular Buildings Electrician $11.56 1 King Modular Buildings Equipment Maintenance $11.56 1 King Modular Buildings Plumber $11.56 1 King Modular Buildings Production Worker $9.471 1 https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015 Page 7 of 17 King Modular Buildings Tool Maintenance $11.56 1 King Modular Buildings Utility Person $11.56 1 King Modular Buildings Welder $11.56 1 King Painters Journey Level $37.80 6Z 2B King Pile Driver Journey Level $52.57 5D 4C King Plasterers Journey Level $50.42 7G 1R King Playground Et Park Equipment Journey Level $9.47 1 Installers King Plumbers Et Pipefitters Journey Level $74.69 6Z 1G King Power Equipment Operators Asphalt Plant Operators $55.24 7A 3C 8P King Power Equipment Operators Assistant Engineer $51.97 7A 3C 8P King Power Equipment Operators Barrier Machine (zipper) $54.75 7A 3C 8P King Power Equipment Operators Batch Plant Operator, Concrete $54.75 7A 3C 8P King Power Equipment Operators Bobcat $51.97 7A 3C 8P King Power Equipment Operators Brokk - Remote Demolition Equipment $51.97 7A 3C 8P King Power Equipment Operators Brooms $51.97 7A 3C 8P King Power Equipment Operators Bump Cutter $54.75 7A 3C 8P King Power Equipment Operators Cableways $55.24 7A 3C 8P King Power Equipment Operators Chipper $54.75 7A 3C 8P King Power Equipment Operators Compressor $51.97 7A 3C 8P King Power Equipment Operators Concrete Pump: Truck Mount With Boom Attachment Over 42 M $55.24 7A 3C 8P King Power Equipment Operators Concrete Finish Machine -laser Screed $51.97 7A 3C 8P King Power Equipment Operators Concrete Pump - Mounted Or Trailer High Pressure Line Pump, Pump High Pressure. $54.33 7A 3C 8P King Power Equipment Operators Concrete Pump: Truck Mount With Boom Attachment Up To 42m $54.75 7A 3C 8P King Power Equipment Operators Conveyors $54.33 7A 3C 8P King Power Equipment Operators Cranes: 20 Tons Through 44 Tons With Attachments $54.75 7A 3C 8P King Power Equipment Operators Cranes: 100 Tons Through 199 Tons, Or 150' Of Boom (Including Jib With Attachments) $55.79 7A 3C 8P King Power Equipment Operators Cranes: 200 Tons To 300 Tons, Or 250' Of Boom (including Jib With Attachments) $56.36 7A 3C 8P King Power- Equipment Operators Cranes: 45 Tons Through 99 Tons, Under 150' Of Boom (including Jib With Attachments) $55.24 7A 3C 8P King Power Equipment Operators Cranes: A -frame - 10 Tons And Under $51.97 7A 3C 8P https://fortress.wa.gov/lni/wagelookup/prvWageIookup.aspx 07/13/2015 Page 8 of 17 King Power Equipment Operators Cranes: Friction 100 Tons Through 199 Tons $56.36 7A 3C 8P King Power Equipment Operators Cranes: Friction Over 200 Tons $56.92 7A 3C 8P King Power Equipment Operators Cranes: Over 300 Tons Or 300' Of Boom (including Jib With Attachments) $56.92 7A 3C 8P King Power Equipment Operators Cranes: Through 19 Tons With Attachments A -frame Over 10 Tons $54.33 7A 3C 8P King Power Equipment Operators Crusher $54.75 7A 3C 8P King Power Equipment Operators Deck Engineer/deck Winches (power) $54.75 7A 3C 8P King Power Equipment Operators Derricks, On Building Work $55.24 7A 3C 8P King Power Equipment Operators Dozers D-9 Et Under $54.33 7A 3C 8P King Power Equipment Operators Drill Oilers: Auger Type, Truck Or Crane Mount $54.33 7A 3C 8P King Power Equipment Operators Drilling Machine $54.75 7A 3C 8P King Power Equipment Operators Elevator And Man -lift: Permanent And Shaft Type $51.97 7A 3C 8P King Power Equipment Operators Finishing Machine, Bidwell And Gamaco Et Similar Equipment $54.75 7A 3C 8P King Power Equipment Operators Forklift: 3000 Lbs And Over With Attachments $54.33 7A 3C 8P King Power Equipment Operators Forklifts: Under 3000 Lbs. With Attachments $51.97 7A 3C 8P King Power Equipment Operators Grade Engineer: Using Blue Prints, Cut Sheets, Etc $54.75 7A 3C 8P King Power Equipment Operators Gradechecker/stakeman $51.97 7A 3C 8P King Power Equipment Operators Guardrail Punch $54.75 7A 3C 8P King Power Equipment Operators Hard Tail End Dump Articulating Off- Road Equipment 45 Yards. Et Over $55.24 7A 3C 8P King Power Equipment Operators Hard Tail End Dump Articulating Off -road Equipment Under 45 Yards $54.75 7A 3C 8P King Power Equipment Operators Horizontal/directional Drill Locator $54.33 7A 3C 8P King Power Equipment Operators Horizontal/directional Drill Operator $54.75 7A 3C 8P King Power Equipment Operators Hydralifts/boom Trucks Over 10 Tons $54.33 7A 3C 8P King Power Equipment Operators Hydralifts/boom Trucks, 10 Tons And Under $51.97 7A 3C 8P King Power Equipment Operators Loader, Overhead 8 Yards. Et Over $55.79 7A 3C 8P King Power Equipment Operators Loader, Overhead, 6 Yards. But Not Including 8 Yards $55.24 7A 3C 8P King Power Equipment Operators Loaders, Overhead Under 6 Yards $54.75 7A 3C 8P https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015 Page 9 of 17 King Power Equipment Operators Loaders, Plant Feed $54.75 7A 3C 8P King Power Equipment Operators Loaders: Elevating Type Belt $54.33 7A 3C 8P King Power Equipment Operators Locomotives, All $54.75 7A 3C 8P King Power Equipment Operators Material Transfer Device $54.75 7A 3C 8P King Power Equipment Operators Mechanics, All (leadmen - $0.50 Per Hour Over Mechanic) $55.79 7A 3C 8P King Power Equipment Operators Motor Patrol Grader - Non- finishing $54.33 7A 3C 8P King Power Equipment Operators Motor Patrol Graders, Finishing $55.24 7A 3C 8P King Power Equipment Operators Mucking Machine, Mole, Tunnel Drill, Boring, Road Header And/or Shield $55.24 7A 3C 8P King Power Equipment Operators Oil Distributors, Blower Distribution Et Mulch Seeding Operator $51.97 7A 3C 8P King Power Equipment Operators Outside Hoists (elevators And Manlifts), Air Tuggers,strato $54.33 7A 3C 8P King Power Equipment Operators Overhead, Bridge Type Crane: 20 Tons Through 44 Tons $54.75 7A 3C 8P King Power Equipment Operators Overhead, Bridge Type: 100 Tons And Over $55.79 7A 3C 8P King Power Equipment Operators Overhead, Bridge Type: 45 Tons Through 99 Tons $55.24 7A 3C 8P King Power Equipment Operators Pavement Breaker $51.97 7A 3C 8P King Power Equipment Operators Pile Driver (other Than Crane Mount) $54.75 7A 3C 8P King Power Equipment Operators Plant Oiler - Asphalt, Crusher $54.33 7A 3C 8P King Power Equipment Operators Posthole Digger, Mechanical $51.97 7A 3C 8P King Power Equipment Operators Power Plant $51.97 7A 3C 8P King Power Equipment Operators Pumps - Water $51.97 7A 3C 8P King Power Equipment Operators Quad 9, Hd 41, D10 And Over $55.24 7A 3C 8P King Power Equipment Operators Quick Tower - No Cab, Under 100 Feet In Height Based To Boom $51.97 7A 3C 8P King Power Equipment Operators Remote Control Operator On Rubber Tired Earth Moving Equipment $55.24 7A 3C 8P King Power Equipment Operators Rigger And Bellman $51.97 7A 3C 8P King Power Equipment Operators Rollagon $55.24 7A 3C 8P King Power Equipment Operators Roller, Other Than Plant Mix $51.97 7A 3C 8P King Power Equipment Operators Roller, Plant Mix Or Multi -lift Materials $54.33 7A 3C 8P King Power Equipment Operators Roto-mill, Roto-grinder $54.75 7A 3C 8P King Power Equipment Operators Saws - Concrete $54.33 7A 3C 8P King Power Equipment Operators Scraper, Self Propelled Under 45 Yards $54.75 7A 3C 8P King Power Equipment Operators Scrapers - Concrete Et Carry All $54.33 7A 3C 8P King Power Equipment Operators Scrapers, Self-propelled: 45 $55.24 7A 3C 8P https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015 Page 10 of 17 Yards And Over King Power Equipment Operator s Service Engineers - Equipment $54.33 7A 3C 813 King Power Equipment Operators Shotcrete/gunite Equipment $51.97 7A 3C 8P King Power Equipment Operators Shovel , Excavator, Backhoe, Tractors Under 15 Metric Tons. $54.33 7A 3C 8P King Power Equipment Operators Shovel, Excavator, Backhoe: Over 30 Metric Tons To 50 Metric Tons $55.24 7A 3C 8P King Power Equipment Operators Shovel, Excavator, Backhoes, Tractors: 15 To 30 Metric Tons $54.75 7A 3C 8P King Power Equipment Operators Shovel, Excavator, Backhoes: Over 50 Metric Tons To 90 Metric Tons $55.79 7A 3C 8P King Power Equipment Operators Shovel, Excavator, Backhoes: Over 90 Metric Tons $56.36 7A 3C 8P King Power Equipment Operators Slipform Pavers $55.24 7A 3C 8P King Power Equipment Operators Spreader, Topsider Et Screedman $55.24 7A 3C 8P King Power Equipment Operators Subgrader Trimmer $54.75 7A 3C 8P King Power Equipment Operators Tower Bucket Elevators $54.33 7A 3C 8P King Power Equipment Operators Tower Crane Over 175'in Height, Base To Boom $56.36 7A 3C 8P King Power Equipment Operators Tower Crane Up To 175' In Height Base To Boom $55.79 7A 3C 8P King Power Equipment Operators Transporters, Alt Track Or Truck Type $55.24 7A 3C 8P King Power Equipment Operators Trenching Machines $54.33 7A 3C 8P King Power Equipment Operators Truck Crane Oiler/driver - 100 Tons And Over $54.75 7A 3C 8P King Power Equipment Operators Truck Crane Oiler/driver Under 100 Tons $54.33 7A 3C 8P King Power Equipment Operators Truck Mount Portable Conveyor $54.75 7A 3C 8P King Power Equipment Operators Welder $55.241 7A 3C 8P King Power Equipment Operators Wheel Tractors, Farmall Type $51.97 7A 3C 8P King Power Equipment Operators Yo Yo Pay Dozer $54.75 7A 3C 8P King Power Equipment Operators- Asphalt Plant Operators $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Assistant Engineer $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Barrier Machine (zipper) $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Batch Plant Operator, Concrete $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Bobcat $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Brokk - Remote Demolition Equipment $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Brooms $51.97 7A 3C 8P Underground Sewer Et Water https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015 Page 11 of 17 King Power Equipment Operators- Bump Cutter $54.75 7A 3C 8P Underground Sewer It Water King Power Equipment Operators- Cableways $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Chipper $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Compressor $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Concrete Pump: Truck Mount With Boom Attachment Over 42 M $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Concrete Finish Machine -laser Screed $51.97 7A 3C 8P Underground Sewer 8t Water King Power Equipment Operators- Concrete Pump - Mounted Or Trailer High Pressure Line Pump, Pump High Pressure. $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Concrete Pump: Truck Mount With Boom Attachment Up To 42m $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Conveyors $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: 20 Tons Through 44 Tons With Attachments $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: 100 Tons Through 199 Tons, Or 150' Of Boom (Including Jib With Attachments) $55.79 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: 200 Tons To 300 Tons, Or 250' Of Boom (including Jib With Attachments) $56.36 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: 45 Tons Through 99 Tons, Under 150' Of Boom (including Jib With Attachments) $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: A -frame - 10 Tons And Under $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: Friction 100 Tons Through 199 Tons $56.36 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: Friction Over 200 Tons $56.92 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: Over 300 Tons Or 300' Of Boom (including Jib With Attachments) $56.92 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: Through 19 Tons With Attachments A -frame Over 10 Tons $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Crusher $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Deck Engineer/deck Winches (power) $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Derricks, On Building Work $55.24 7A 3C 8P https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015 Page 12 of 17 Underground Sewer Et Water King Power Equipment Operators- Dozers D-9 Et Under $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Drill Oilers: Auger Type, Truck Or Crane Mount $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Drilling Machine $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Elevator And Man -lift: Permanent And Shaft Type $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Finishing Machine, Bidwell And Gamaco Et Similar Equipment $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Forklift: 3000 Lbs And Over With Attachments $54.33 7A 3C 8P Underground Sewer &t Water King Power Equipment Operators- Forklifts: Under 3000 Lbs. With Attachments $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Grade Engineer: Using Blue Prints, Cut Sheets, Etc $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Gradechecker/stakeman $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Guardrail Punch $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Hard Tail End Dump Articulating Off- Road Equipment 45 Yards. Et Over $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Hard Tail End Dump Articulating Off -road Equipment Under 45 Yards $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Horizontal/directional Drill Locator $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Horizontal/directional Drill Operator $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Hydralifts/boom Trucks Over 10 Tons $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Hydralifts/boom Trucks, 10 Tons And Under $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Loader, Overhead 8 Yards. Et Over $55.79 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Loader, Overhead, 6 Yards. But Not Including 8 Yards $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Loaders, Overhead Under 6 Yards $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Loaders, Plant Feed $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Loaders: Elevating Type Belt $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Locomotives, All $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Material Transfer Device $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Mechanics, All (leadmen - $55.79 7A 3C 8P https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015 Page 13 of 17 Underground Sewer Et Water $0.50 Per Hour Over Mechanic) King Power Equipment Operators- Motor Patrol Grader - Non- finishing $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Motor Patrol Graders, Finishing $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Mucking Machine, Mole, Tunnel Drill, Boring, Road Header And/or Shield $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Oil Distributors, Blower Distribution Et Mulch Seeding Operator $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Outside Hoists (elevators And Manlifts), Air Tuggers,strato $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Overhead, Bridge Type Crane: 20 Tons Through 44 Tons $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Overhead, Bridge Type: 100 Tons And Over $55.79 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Overhead, Bridge Type: 45 Tons Through 99 Tons $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Pavement Breaker $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Pile Driver (other Than Crane Mount) $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Plant Oiler - Asphalt, Crusher $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Posthole Digger, Mechanical $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Power Plant $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Pumps - Water $51.97 7A 3C 8P Underground Sewer E; Water King Power Equipment Operators- Quad 9, Hd 41, D10 And Over $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Quick Tower - No Cab, Under 100 Feet In Height Based To Boom $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Remote Control Operator On Rubber Tired Earth Moving Equipment $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Rigger And BeRman $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Rollagon $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Other Than Plant Mix $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Plant Mix Or Multi -lift Materials $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Roto-mill, Roto-grinder $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Saws - Concrete $54.33 7A 3C 8P littps:Hfortress.wa.gov/lni/wagelookup/prvWageIookup.aspx 07/13/2015 Page 14 of 17 Underground Sewer Et Water King Power Equipment Operators- Scraper, Self Propelled Under 45 Yards $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Scrapers - Concrete Et Carry All $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Scrapers, Self-propelled: 45 Yards And Over $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Service Engineers - Equipment $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shotcrete/gunite Equipment $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shovel , Excavator, Backhoe, Tractors Under 15 Metric Tons. $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shovel, Excavator, Backhoe: Over 30 Metric Tons To 50 Metric Tons $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shovel, Excavator, Backhoes, Tractors: 15 To 30 Metric Tons $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shovel, Excavator, Backhoes: Over 50 Metric Tons To 90 Metric Tons $55.79 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shovel, Excavator, Backhoes: Over 90 Metric Tons $56.36 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Slipform Pavers $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Spreader, Topsider Et Screedman $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Subgrader Trimmer $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Bucket Elevators $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Crane Over 175'in Height, Base To Boom $56.36 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Crane Up To 175' In Height Base To Boom $55.79 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Transporters, All Track Or Truck Type $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Trenching Machines $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Truck Crane Oiler/driver - 100 Tons And Over $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Truck Crane Oiler/driver Under 100 Tons $54.33 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Truck Mount Portable Conveyor $54.75 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Welder $55.24 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Wheel Tractors, Farman Type $51.97 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Yo Yo Pay Dozer $54.75 7A 3C 8P https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015 Page 15 of 17 Underground Sewer Et Water King Power Line Clearance Tree Journey Level In Charge $45.75 5A 4A Trimmers King Power Line Clearance Tree Spray Person $43.38 5A 4A Trimmers King Power Line Clearance Tree Tree Equipment Operator $45.75 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer $40.84 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer Groundperson $30.74 5A 4A Trimmers King Refrigeration Et Air Conditioning Mechanics Journey Level $73.51 6Z 1G King Residential Brick Mason Journey Level $51.32 5A 1M King Residential Carpenters Journey Level $28.20 1 King Residential Cement Masons Journey Level $22.64 1 King Residential Drywall Applicators Journey Level $40.14 5D 4C King Residential Drywall Tapers Journey Level $52.37 5P 1 E King Residential Electricians Journey Level $30.44 1 King Residential Glaziers Journey Level $37.30 7L 1 H King Residential Insulation Aaplicators Journey Level $26.28 1 King Residential Laborers Journey Level $23.03 1 King Residential Marble Setters Journey Level $24.09 1 King Residential Painters Journey Level $24.46 1 King Residential Plumbers Et Pipefitters Journey Level $34.69 1 King Residential Refrigeration Et Air Journey Level $73.51 6Z 1G Conditioning Mechanics King Residential Sheet Metal Workers Journey Level (Field or Shop) $42.58 7F 1 R King Residential Soft Floor Lavers Journey Level $42.41 5A 3D King Residential Sprinkler Fitters Journey Level $42.48 5C 2R (Fire Protection) King Residential Stone Masons Journey Level $51.32 5A 1M King Residential Terrazzo Workers Journey Level $46.96 5A 1M King Residential Terrazzo/Tile Journey Level $21.46 1 Finishers King Residential Tile Setters Journey Level $25.17 1 King Roofers Journey Level $45.71 5A 3H King Roofers Using Irritable Bituminous Materials $48.71 5A 3H King Sheet Metal Workers Journey Level (Field or Shop) $70.37 7F 1 E King Shipbuilding Et Ship Repair Boilermaker $39.82 7M 1H King Shipbuilding Et Ship Repair Carpenter $39.24 7T 2B King Shipbuilding Et Ship Repair Electrician $40.16 7T 4B King Shipbuilding Et Ship Repair Heat Et Frost Insulator $61.18 5J 1 S https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015 Page 16 of 17 King Shipbuilding Et Ship Repair Laborer $40.19 7T 4B King Shipbuilding Et Ship Repair Machinist $40.18 7T 4B King Shipbuilding Et Ship Repair Operator $40.11 7T 4B King Shipbuilding Et Ship Repair Painter $40.16 7T 4B King Shipbuilding Et Ship Repair Pipefitter $40.11 7T 4B King Shipbuilding Et Ship Repair Rigger $40.19 7T 4B King Shipbuilding Et Ship Repair Sheet Metal $40.14 7T 4B King Shipbuilding Et Ship Repair Shipfitter $40.19 7T 4B King Shipbuilding 4 Ship Repair Trucker $40.03 7T 4B King Shipbuilding Et Ship Repair Warehouse $40.08 7T 4B King Shipbuilding Et Ship Repair Welder/Burner $40.19 7T 4B King Sign Makers Et Installers (Electrical) Sign Installer $22.92 1 King Sign Makers Et Installers (Electrical) Sign Maker $21.36 1 King Sign Makers Et Installers (Non- Sign Installer $27.28 1 Electrical ) King Sign Makers Et Installers (Non- Sign Maker $33.25 1 Electrical) King Soft Floor Lavers Journey Level $42.41 5A 3D King Solar Controls For Windows Journey Level $12.44 1 King Sprinkler Fitters (Fire Protection) Journey Level $69.74 5C 1X King Stage Rigging, Mechanics (Non Journey Level $13.23 1 Structural} King Stone Masons Journey Level $51.32 5A 1M King Street And Parking Lot Sweeper Workers Journey Level $19.09 1 King Surveyors Assistant Construction Site Surveyor $54.33 7A 3C 8P King Surveyors Chainman $53.81 7A 3C 8P King Surveyors Construction Site Surveyor $55.241 7A 3C 8P King Telecommunication Technicians Journey Level $22.76 1 King Telephone Line Construction - Cable Splicer $36.96 5A 2B Outside King Telephone Line Construction - Hole Digger/Ground Person $20.49 5A 2B Outside King Telephone Line Construction - Installer (Repairer) $35.40 5A 2B Outside King Telephone Line Construction - Special Aparatus Installer 1 $36.96 5A 2B Outside King Telephone Line Construction - Special Apparatus Installer II $36.19 5A 2B Outside King Telephone Line Construction - Telephone Equipment Operator (Heavy) $36.96 5A 2B Outside King Telephone Line Construction - Telephone Equipment Operator (Light) $34.34 5A 2B Outside https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015 Paue 17 of 17 King Telephone Line Construction, Telephone Lineperson $34.34 5A 2B Outside King Telephone Line Construction_ - Television Groundperson $19.45 5A 2B Outside King Telephone Line Construction - Television Lineperson/Installer $25.89 5A 2B Outside King Telephone Line Construction - Television System Technician $30.97 5A 2B Outside King Telephone Line Construction - Television Technician $27.77 5A 2B Outside King Telephone Line Construction - Tree Trimmer $34.34 5A 2B Outside King Terrazzo Workers Journey Level $46.96 5A 1M King Tile Setters Journey Level $21.651 1 King Tile, Marble Et Terrazzo Finishers Finisher $37.79 5A 1 B King Traffic Control Stripers Journey Level $43.11 7A 1 K King Truck Drivers Asphalt Mix Over 16 Yards (W. WA -Joint Council 28) $49.85 5D 3A 8L King Truck Drivers Asphalt Mix To 16 Yards (W. WA -Joint Council 28) $49.01 5D 3A 8L King Truck Drivers Dump Truck I* Trailer $49.85 5D 3A 8L King Truck Drivers Dump Truck (W. WA -Joint Council 28) $49.01 5D 3A 8L King Truck Drivers Other Trucks (W. WA -Joint Council 28) $49.85 5D 3A 8L King Truck Drivers Transit Mixer $43.23 1 King Well Drillers Et Irrigation Pump Irrigation Pump Installer $17.71 1 Installers King Well Drillers Et Irrigation Pump Oiler $12.97 1 Installers King Well Drillers & Irrigation Pump Well Driller $18.00 1 Installers https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015 5117 1 864551 1508 LAw $ 645511 1 50 0A 645 511 116 5511 5511670 1 -I 612 • Tiffany Par. 0 W­4rl;� . -0 I Ar Seattle-AWaterlinex-Tp.; Y`r � TtvXxIL:$:,z z i p � i �S er . s i