Cascade Interceptor Rehabilitation Phase 11 Vicinity Map
CITY OF RENTON
CALL FOR BIDS
Cascade Interceptor Rehabilitation Phase II
WWP-27-03831
Sealed bids will be received until 11:30 a.m. Tuesday, August 4, 2015 at the City Clerk's office,
7th floor and will be opened and publicly read in conference room Conference Room 511 on the
51h floor, Renton City Hall, 1055 South Grady Way, Renton WA 98057.
The work to be performed within 45 working days from the Notice to Proceed Date under this
contract shall include, but not be limited to:
The rehabilitation of a portion of Renton's sanitary sewer system through the installation of
approximately 605 linear feet of 14" Cured in Place Pipe (CIPP), 265 linear feet of 18" CIPP, 979
linear feet of 21" CIPP, 2,935 linear feet of 24" CIPP, reinstatement of 2 side sewer laterals, and
the rehabilitation of 20 concrete manholes. Manhole depths range from 6' to 28'. Work will
include pre -installation inspection and cleaning of the sewer facilities as well as post installation
inspection and the bypass pumping of flows necessary for each phase of the work.
Any contractor connected with this project shall comply with all Federal, State, County, and City
codes and regulations applicable to such work and perform the work in accordance with the
plans and specifications of this contract document.
The City reserves the right to reject any and/or all bids and to waive any and/or all informalities
Bid documents will be available July 21, 2015. Plans, specifications, addenda, and the plan
holders list for this project are available on-line through Builders Exchange of Washington, Inc.,
at http://www.bxwa.com. Click on "bxwa.com"; "Posted Projects", "Public Works", "City of
Renton", "Projects Bidding". (Note: Bidders are encouraged to "Register as a Bidder," in order
to receive automatic email notification of future addenda and to be placed on the "Bidders
List.")
If a bidder has any questions regarding the project, please contact the Project Manager, John
Hobson, at 1055 South Grady Way, Renton, WA 98057 or (425) 430-7279.
A certified check or bid bond in the amount of five percent (5%) of the total of each bid must
accompany each bid.
The City's Fair Practices, Non -Discrimination, and Americans with Disability Act Policies shall
apply.
Jason Seth, City Clerk
Published:
Daily Journal of Commerce July 21, 2015
Daily Journal of Commerce July 28, 2015
CITY OF RENTON PUBLIC WORKS DEPARTMENT
CASCADE INTERCEPTOR REHABILITATION PHASE II
TOTAL PRICE OF BOTH SCHEDULES WILL BE USED TO DETERMINE SUCCESSFUL LOW RESPONSIVE BIDDER
(Note: The bid price shall be stated in figures only, in terms of the units indicated and as to a total amount. In the event of errors or where
conflict occurs, the unit price bid shall govern. Illegible figures will invalidate the bid)
SEE SECTION 1-09.14 OF THE SPECIAL PROVISIONS FOR INFORMATION ON BID ITEMS.
ITE
APPROX.
ITEM
UNIT PRICE
AMOUNT
.
NOQUANTITY
Dollars Cents.
Dollars Cents.
1
1
Mobilization & Demobilization
$
$
Lump Sum
per Lump Sum
2
1
Traffic Control
$
$
Lump Sum
per Lump Sum
3
4,784
Pre -Installation Cleaning and Inspection
S
$
per Linear Foot
Linear Foot
4
605
Install 14" CIPP
$
$
per Linear Foot
Linear Foot
5
265
Install 18" CIPP
$
$
per Linear Foot
Linear Foot
6
979
Install 21" CIPP
$
$
per Linear Foot
Linear Foot
7
2,935
Install 24" CIPP
$
$
Linear Foot
per Linear Foot
8
2
Reinstate Side Sewer Taps
$
$
per Each
Each
9
4,784
Post Installation Inspection
$
$
per Linear Foot
Linear Foot
10
4
Sewer Manhole Rehabilitation 0' to 10' deep
$
per Each
Each
11
10
Sewer Manhole Rehabilitation 1 1' to 20' deep
$
$
per Each
Each
12
6
Sewer Manhole Rehabilitation 21' to 30' deep
$
$
per Each
Each
CITY OF RENTON PUBLIC WORKS DEPARTMENT
CASCADE INTERCEPTOR REHABILITATION PHASE II
TOTAL PRICE OF BOTH SCHEDULES WILL BE USED TO DETERMINE SUCCESSFUL LOW RESPONSIVE BIDDER
(Note: The bid price shall be stated in figures only, in terms of the units indicated and as to a total amount. In the event of errors or where
conflict occurs, the unit price bid shall govern. Illegible figures will invalidate the bid)
SEE SECTION 1-09.14 OF THE SPECIAL PROVISIONS FOR INFORMATION ON BID ITEMS.
ITE
.
NOQUANTITY
APPROX.
ITEM
UNIT PRICE
Dollars Cents.
AMOUNT
Dollars Cents.
Subtotal
9.5% Sales Tax
Total
S
S
$
Page 1 of 17
State of Washington
Department of Labor & Industries
Prevailing Wage Section - Telephone 360-902-5335
PO Box 44540, Olympia, WA 98504-4540
Washington State Prevailing Wage
The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate
of fringe benefits. On public works projects, worker's wage and benefit rates must add to
not less than this total. A brief description of overtime calculation requirements are
provided on the Benefit Code Key.
Journey Level Prevailing Wage Rates for the Effective Date:
7/13/2015
County
Trade
Job Classification
Wage lHoliday
Overtime
Note
King
Asbestos Abatement Workers
Journey Level
$42.67
5D
1 H
King
Boilermakers
Journey Level
$64.29
5N
1C
King
Brick Mason
Brick And Block Finisher
$44.46
5A
1M
King
Brick Mason
Journey Level
$51.32
5A
1M
King
Brick Mason
Pointer -Caulker -Cleaner
$51.32
5A
1M
King
Building Service Employees
Janitor
$21.29
5S
2F
King
Building Service Employees
Traveling Waxer/Shampooer
$21.70
5S
2F
King
Building Service Employees
Window Cleaner (Non -Scaffold)
$24.94
5S
2F
King
Building Service Employees
Window Cleaner (Scaffold)
$25.80
5S
2F
King
Cabinet Makers (In Shop)
Journey Level
$22.74
1
King
Carpenters
Acoustical Worker
$52.32
5D
4C
King
Carpenters
Bridge, Dock And Wharf
Carpenters
$52.32
5D
4C
King
Carpenters
Carpenter
$52.32
5D
4C
King
Carpenters
Carpenters on Stationary Tools
$52.45
5D
4C
King
Carpenters
Creosoted Material
$52.42
5D
4C
King
Carpenters
Floor Finisher
$52.32
5D
4C
King
Carpenters
Floor Layer
$52.32
5D
4C
King
Carpenters
Scaffold Erector
$52.32
5D
4C
King
Cement Masons
Journey Level
$52.38
7A
1M
King
Divers Et Tenders
Diver
$105.37
5D
4C
8A
King
Divers Et Tenders
Diver On Standby
$59.50
5D
4C
King
Divers Et Tenders
Diver Tender
$54.82
5D
4C
King
Divers Et Tenders
Surface Rcv Et Rov Operator
$54.82
5D
4C
King
Divers Et Tenders
Surface Rcv Et Rov Operator
Tender
$51.07
5A
4C
King
Dredge Workers
Assistant Engineer
$54.75
5D
3F
King
Dredge Workers
Assistant Mate (Deckhand)
$54.33
5D
3F
littps://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015
Page 2 of 17
King
Dredge Workers
Boatmen
$54.75
5D
3F
King
Dredge Workers
Engineer Welder
$55.791
5D
3F
King
Dredge Workers
Leverman, Hydraulic
$56.92
5D
3F
King
Dredge Workers
Mates
$54.75
5D
3F
King
Dredge Workers
Oiler
$54.33
5D
3F
King
Drywall Applicator
Journey Level
$52.32
5D
1H
King
Drywall Tapers
Journey Level
$52.37
5P
1E
King
Electrical Fixture Maintenance
Journey Level
$26.59
5L
1 E
Workers
King
Electricians - Inside
Cable Splicer
$66.76
7C
4E
King
Electricians - Inside
Cable Splicer (tunnel)
$71.67
7C
4E
King
Electricians - Inside
Certified Welder
$64.54
7C
4E
King
Electricians - Inside
Certified Welder (tunnel)
$69.22
7C
4E
King
Electricians - Inside
Construction Stock Person
$37.19
7C
4E
King
Electricians - Inside
Journey Level
$62.30
7C
4E
King
Electricians - Inside
Journey Level (tunnel)
$66.76
7C
4E
King
Electricians - Motor Shop
Craftsman
$15.37
1
King
Electricians - Motor Shop
Journey Level
$14.69
1
King
Electricians - Powerline
Construction
Cable Splicer
$69.95
5A
4D
King
Electricians - Powerline
Construction
Certified Line Welder
$63.97
5A
4D
King
Electricians - Powerline
Construction
Groundperson
$43.62
5A
4D
King
Electricians - Powerline
Construction
Heavy Line Equipment
Operator
$63.97
5A
4D
King
Electricians - Powerline
Construction
Journey Level Lineperson
$63.97
5A
4D
King
Electricians - Powerline
Construction
Line Equipment Operator
$53.81
5A
4D
King
Electricians - Powerline
Construction
Pole Sprayer
$63.97
5A
4D
King
Electricians - Powerline
Construction
Powderperson
$47.55
5A
4D
King
Electronic Technicians
Journey Level
$31.00
1
King
Elevator Constructors
Mechanic
$82.67
7D
4A
King
Elevator Constructors
Mechanic In Charge
$89.40
7D
4A
King
Fabricated Precast Concrete
All Classifications - In -Factory
Work Only
$15.90
5B
1 R
Products
King
Fence Erectors
Fence Erector
$15.18
1
King
Flaggers
Journey Level
$36.17
7A
31
King
Glaziers
Journey Level
$54.91
7L
1Y
King
Heat Et Frost Insulators And
Journeyman
$61.18
5J
1S
Asbestos Workers
King
Heating Equipment Mechanics
Journey Level
$70.37
7F
1E
King
Hod Carriers Et Mason Tenders
Journey Level
$44.00
7A
31
King
Industrial Power Vacuum
Journey Level
$9.47
1
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015
Page 3 of 17
Cleaner
King
Inland Boatmen
Boat Operator
$54.57
5B
1 K
King
Inland Boatmen
Cook
$50.95
5B
1 K
King
Inland Boatmen
Deckhand
$51.19
5B
1 K
King
Inland Boatmen
Deckhand Engineer
$52.18
5B
1 K
King
Inland Boatmen
Launch Operator
$53.40
5B
1 K
King
Inland Boatmen
Mate
$53.40
5B
1 K
King
Inspection/Cteaning/Seating Of
Cleaner Operator, Foamer
Operator
$31.49
1
Sewer Et Water Systems By
Remote Control
King
Inspection/Cleaning/Sealing Of
Grout Truck Operator
$11.48
1
Sewer Et Water Systems By
Remote Control
King
Inspection/Cleaning/Seating Of
Head Operator
$24.91
1
Sewer Er Water Systems By
Remote Control
King
Inspection/Cleaning/Sealing Of
Technician
$19.33
1
Sewer Et Water Systems By
Remote Control
King
Inspection/Cleaning/Sealing Of
Tv Truck Operator
$20.45
1
Sewer Et Water Systems By
Remote Control
King
Insulation Applicators
Journey Level
$52.32
5D
4C
King
Ironworkers
Journeyman
$61.62
7N
10
King
Laborers
Air, Gas Or Electric Vibrating
Screed
$42.67
7A
31
King
Laborers
Airtrac Drill Operator
$44.00
7A
31
King
Laborers
Ballast Regular Machine
$42.67
7A
31
King
Laborers
Batch Weighman
$36.17
7A
31
King
Laborers
Brick Pavers
$42.67
7A
31
King
Laborers
Brush Cutter
$42.67
7A
31
King
Laborers
Brush Hog Feeder
$42.67
7A
31
King
Laborers
Burner
$42.67
7A
31
King
Laborers
Caisson Worker
$44.00
7A
31
King
Laborers
Carpenter Tender
$42.67
7A
31
King
Laborers
Caulker
$42.67
7A
31
King
Laborers
Cement Dumper -paving
$43.46
7A
31
King
Laborers
Cement Finisher Tender
$42.67
7A
31
King
Laborers
Change House Or Dry Shack
$42.67
7A
31
King
Laborers
Chipping Gun (under 30 Lbs.)
$42.67
7A
31
King
Laborers
Chipping Gun(30 Lbs. And
Over)
$43.46
7A
31
King
Laborers
Choker Setter
$42.67
7A
31
King
Laborers
Chuck Tender
$42.67
7A
31
King
Laborers
Clary Power Spreader
$43.46
7A
31
King
Laborers
Clean-up Laborer
$42.67
7A
31
King
Laborers
Concrete Dumper/chute
$43.46
7A
31
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015
Page 4 of 17
Operator
King
Laborers
Concrete Form Stripper
$42.67
7A
31
King
Laborers
Concrete Placement Crew
$43.46
7A
31
King
Laborers
Concrete Saw Operator/core
Driller
$43.46
7A
31
King
Laborers
Crusher Feeder
$36.171
7A
31
King
Laborers
Curing Laborer
$42.67
7A
31
King
Laborers
Demolition: Wrecking Et Moving
(incl. Charred Material)
$42.67
7A
31
King
Laborers
Ditch Digger
$42.67
7A
31
King
Laborers
Diver
$44.001
7A
31
King
Laborers
Drill Operator
(hydraulic, diamond)
$43.46
7A
31
King
Laborers
Dry Stack Walls
$42.67
7A
31
King
Laborers
Dump Person
$42.67
7A
31
King
Laborers
Epoxy Technician
$42.671
7A
31
King
Laborers
Erosion Control Worker
$42.67
7A
31
King
Laborers
Faller Et Bucker Chain Saw
$43.46
7A
31
King
Laborers
Fine Graders
$42.67
7A
31
King
Laborers
Firewatch
$36.17
7A
31
King
Laborers
Form Setter
$42.67
7A
31
King
Laborers
Gabian Basket Builders
$42.67
7A
31
King
Laborers
General Laborer
$42.67
7A
31
King
Laborers
Grade Checker Et Transit
Person
$44.00
7A
31
King
Laborers
Grinders
$42.67
7A
31
King
Laborers
Grout Machine Tender
$42.67
7A
31
King
Laborers
Groutmen (pressure)including
Post Tension Beams
$43.46
7A
31
King
Laborers
Guardrail Erector
$42.67
7A
31
King
Laborers
Hazardous Waste Worker (level
A)
$44.00
7A
31
King
Laborers
Hazardous Waste Worker (level
B)
$43.46
7A
-
31
King
Laborers
Hazardous Waste Worker (level
C)
$42.67
7A
31
King
Laborers
High Scaler
$44.00
7A
31
King
Laborers
Jackhammer
$43.461
7A
31
King
Laborers
Laserbeam Operator
$43.46
7A
31
King
Laborers
Maintenance Person
$42.67
7A
31
King
Laborers
Manhole Builder-mudman
$43.46
7A
31
King
Laborers
Material Yard Person
$42.67
7A
31
King
Laborers
Motorman -dinky Locomotive
$43.46
7A
31
King
Laborers
Nozzleman (concrete Pump,
Green Cutter When Using
Combination Of High Pressure
Air Et Water On Concrete Et
$43.46
7A
31
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015
Page 5 of 17
Rock, Sandblast, Gunite,
Shotcrete, Water Bla
King
Laborers
Pavement Breaker
$43.46
7A
31
King
Laborers
Pilot Car
$36.17
7A
31
King
Laborers
Pipe Layer Lead
$44.00
7A
31
King
Laborers
Pipe Layer/tailor
$43.46
7A
31
King
Laborers
Pipe Pot Tender
$43.46
7A
31
King
Laborers
Pipe Reliner
$43.46
7A
31
King
Laborers
Pipe Wrapper
$43.46
7A
31
King
Laborers
Pot Tender
$42.67
7A
31
King
Laborers
Powderman
$44.00
7A
31
King
Laborers
Powderman's Helper
$42.67
7A
31
King
Laborers
Power Jacks
$43.46
7A
31
King
Laborers
Railroad Spike Puller - Power
$43.46
7A
31
King
Laborers
Raker - Asphalt
$44.00
7A
31
King
Laborers
Re-timberman
$44.00
7A
31
King
Laborers
Remote Equipment Operator
$43.46
7A
31
King
Laborers
Rigger/signal Person
$43.46
7A
31
King
Laborers
Rip Rap Person
$42.67
7A
31
King
Laborers
Rivet Buster
$43.46
7A
31
King
Laborers
Rodder
$43.46
7A
31
King
Laborers
Scaffold Erector
$42.67
7A
31
King
Laborers
Scale Person
$42.67
7A
31
King
Laborers
Sloper (over 20")
$43.46
7A
31
King
Laborers
Sloper Sprayer
$42.67
7A
31
King
Laborers
Spreader (concrete)
$43.46
7A
31
King
Laborers
Stake Hopper
$42.67
7A
31
King
Laborers
Stock Piler
$42.67
7A
31
King
Laborers
Tamper Et Similar Electric, Air
Et Gas Operated Tools
$43.46
7A
31
King
Laborers
Tamper (multiple & Self-
propelled)
$43.46
7A
31
King
Laborers
Timber Person - Sewer (lagger,
Shorer Et Cribber)
$43.46
7A
31
King
Laborers
Toolroom Person (at Jobsite)
$42.67
7A
31
King
Laborers
Topper
$42.67
7A
31
King
Laborers
Track Laborer
$42.67
7A
31
King
Laborers
Track Liner (power)
$43.46
7A
31
King
Laborers
Traffic Control Laborer
$38.68
7A
31
8R
King
Laborers
Traffic Control Supervisor
$38.68
7A
31
8R
King
Laborers
Truck Spotter
$42.67
7A
31
King
Laborers
Tugger Operator
$43.46
7A
31
King
Laborers
Tunnel Work -Compressed Air
Worker 0-30 psi
$64.99
7A
31
8�
King
Laborers
Tunnel Work -Compressed Air
$70.02
7A
31
8Q
https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015
Page 6 of 17
Worker 30.01.44.00 psi
King
Laborers
Tunnel Work -Compressed Air
Worker 44.01-54.00 psi
$73.70
7A
31
8Q
King
Laborers
Tunnel Work -Compressed Air
Worker 54.01-60.00 psi
$79.40
7A
31
8M
King
Laborers
Tunnel Work -Compressed Air
Worker 60.01-64.00 psi
$81.52
7A
31
8M
King
Laborers
Tunnel Work -Compressed Air
Worker 64.01-68.00 psi
$86.62
7A
31
M
King
Laborers
Tunnel Work -Compressed Air
Worker 68.01-70.00 psi
$88.52
7A
31
8Q
King
Laborers
Tunnel Work -Compressed Air
Worker 70.01.72.00 psi
$90.52
7A
31
8M
King
Laborers
Tunnel Work -Compressed Air
Worker 72.01-74.00 psi
$92.52
7A
31
8M
King
Laborers
Tunnel Work-Guage and Lock
Tender
$44.10
7A
31
8M
King
Laborers
Tunnel Work -Miner
$44.10
7A
31
8Q
King
Laborers
Vibrator
$43.461
7A
31
King
Laborers
Vinyl Seamer
$42.67
7A
31
King
Laborers
Watchman
$32.87
7A
31
King
Laborers
Welder
$43.46
7A
31
King
Laborers
Well Point Laborer
$43.46
7A
31
King
Laborers
Window Washer/cleaner
$32.87
7A
31
King
Laborers - Underground Sewei
General Laborer li Topman
$42.67
7A
31
Et Water
King
Laborers - Underground Sewer
Pipe Layer
$43.46
7A
31
Et Water
King
Landscape Construction
Irrigation Or Lawn Sprinkler
Installers
$13.56
1
King
Landscape Construction
Landscape Equipment
Operators Or Truck Drivers
$28.17
1
King
Landscape Construction
Landscaping or Planting
Laborers
$17.87
1
King
Lathers
Journey Level
$52.32
5D
1 H
King
Marble Setters
Journey Level
$51.32
5A
1M
King
Metal Fabrication (In Shop)
Fitter
$15.86
1
King
Metal Fabrication (In Shopi
Laborer
$9.78
1
King
Metal Fabrication (In Shopl
Machine Operator
$13.04
1
King
Metal Fabrication Iln Shop!
Painter
$11.10
1
King
Metal Fabrication (In Shop!
Welder
$15.48
1
King
Millwright
Journey Level
$53.42
5D
4C
King
Modular Buildings
Cabinet Assembly
$11.56
1
King
Modular Buildings
Electrician
$11.56
1
King
Modular Buildings
Equipment Maintenance
$11.56
1
King
Modular Buildings
Plumber
$11.56
1
King
Modular Buildings
Production Worker
$9.471
1
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015
Page 7 of 17
King
Modular Buildings
Tool Maintenance
$11.56
1
King
Modular Buildings
Utility Person
$11.56
1
King
Modular Buildings
Welder
$11.56
1
King
Painters
Journey Level
$37.80
6Z
2B
King
Pile Driver
Journey Level
$52.57
5D
4C
King
Plasterers
Journey Level
$50.42
7G
1R
King
Playground Et Park Equipment
Journey Level
$9.47
1
Installers
King
Plumbers Et Pipefitters
Journey Level
$74.69
6Z
1G
King
Power Equipment Operators
Asphalt Plant Operators
$55.24
7A
3C
8P
King
Power Equipment Operators
Assistant Engineer
$51.97
7A
3C
8P
King
Power Equipment Operators
Barrier Machine (zipper)
$54.75
7A
3C
8P
King
Power Equipment Operators
Batch Plant Operator,
Concrete
$54.75
7A
3C
8P
King
Power Equipment Operators
Bobcat
$51.97
7A
3C
8P
King
Power Equipment Operators
Brokk - Remote Demolition
Equipment
$51.97
7A
3C
8P
King
Power Equipment Operators
Brooms
$51.97
7A
3C
8P
King
Power Equipment Operators
Bump Cutter
$54.75
7A
3C
8P
King
Power Equipment Operators
Cableways
$55.24
7A
3C
8P
King
Power Equipment Operators
Chipper
$54.75
7A
3C
8P
King
Power Equipment Operators
Compressor
$51.97
7A
3C
8P
King
Power Equipment Operators
Concrete Pump: Truck Mount
With Boom Attachment Over 42
M
$55.24
7A
3C
8P
King
Power Equipment Operators
Concrete Finish Machine -laser
Screed
$51.97
7A
3C
8P
King
Power Equipment Operators
Concrete Pump - Mounted Or
Trailer High Pressure Line
Pump, Pump High Pressure.
$54.33
7A
3C
8P
King
Power Equipment Operators
Concrete Pump: Truck Mount
With Boom Attachment Up To
42m
$54.75
7A
3C
8P
King
Power Equipment Operators
Conveyors
$54.33
7A
3C
8P
King
Power Equipment Operators
Cranes: 20 Tons Through 44
Tons With Attachments
$54.75
7A
3C
8P
King
Power Equipment Operators
Cranes: 100 Tons Through 199
Tons, Or 150' Of Boom
(Including Jib With
Attachments)
$55.79
7A
3C
8P
King
Power Equipment Operators
Cranes: 200 Tons To 300 Tons,
Or 250' Of Boom (including Jib
With Attachments)
$56.36
7A
3C
8P
King
Power- Equipment Operators
Cranes: 45 Tons Through 99
Tons, Under 150' Of Boom
(including Jib With
Attachments)
$55.24
7A
3C
8P
King
Power Equipment Operators
Cranes: A -frame - 10 Tons And
Under
$51.97
7A
3C
8P
https://fortress.wa.gov/lni/wagelookup/prvWageIookup.aspx 07/13/2015
Page 8 of 17
King
Power Equipment Operators
Cranes: Friction 100 Tons
Through 199 Tons
$56.36
7A
3C
8P
King
Power Equipment Operators
Cranes: Friction Over 200 Tons
$56.92
7A
3C
8P
King
Power Equipment Operators
Cranes: Over 300 Tons Or 300'
Of Boom (including Jib With
Attachments)
$56.92
7A
3C
8P
King
Power Equipment Operators
Cranes: Through 19 Tons With
Attachments A -frame Over 10
Tons
$54.33
7A
3C
8P
King
Power Equipment Operators
Crusher
$54.75
7A
3C
8P
King
Power Equipment Operators
Deck Engineer/deck Winches
(power)
$54.75
7A
3C
8P
King
Power Equipment Operators
Derricks, On Building Work
$55.24
7A
3C
8P
King
Power Equipment Operators
Dozers D-9 Et Under
$54.33
7A
3C
8P
King
Power Equipment Operators
Drill Oilers: Auger Type, Truck
Or Crane Mount
$54.33
7A
3C
8P
King
Power Equipment Operators
Drilling Machine
$54.75
7A
3C
8P
King
Power Equipment Operators
Elevator And Man -lift:
Permanent And Shaft Type
$51.97
7A
3C
8P
King
Power Equipment Operators
Finishing Machine, Bidwell And
Gamaco Et Similar Equipment
$54.75
7A
3C
8P
King
Power Equipment Operators
Forklift: 3000 Lbs And Over
With Attachments
$54.33
7A
3C
8P
King
Power Equipment Operators
Forklifts: Under 3000 Lbs. With
Attachments
$51.97
7A
3C
8P
King
Power Equipment Operators
Grade Engineer: Using Blue
Prints, Cut Sheets, Etc
$54.75
7A
3C
8P
King
Power Equipment Operators
Gradechecker/stakeman
$51.97
7A
3C
8P
King
Power Equipment Operators
Guardrail Punch
$54.75
7A
3C
8P
King
Power Equipment Operators
Hard Tail End Dump
Articulating Off- Road
Equipment 45 Yards. Et Over
$55.24
7A
3C
8P
King
Power Equipment Operators
Hard Tail End Dump
Articulating Off -road
Equipment Under 45 Yards
$54.75
7A
3C
8P
King
Power Equipment Operators
Horizontal/directional Drill
Locator
$54.33
7A
3C
8P
King
Power Equipment Operators
Horizontal/directional Drill
Operator
$54.75
7A
3C
8P
King
Power Equipment Operators
Hydralifts/boom Trucks Over
10 Tons
$54.33
7A
3C
8P
King
Power Equipment Operators
Hydralifts/boom Trucks, 10
Tons And Under
$51.97
7A
3C
8P
King
Power Equipment Operators
Loader, Overhead 8 Yards. Et
Over
$55.79
7A
3C
8P
King
Power Equipment Operators
Loader, Overhead, 6 Yards. But
Not Including 8 Yards
$55.24
7A
3C
8P
King
Power Equipment Operators
Loaders, Overhead Under 6
Yards
$54.75
7A
3C
8P
https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015
Page 9 of 17
King
Power Equipment Operators
Loaders, Plant Feed
$54.75
7A
3C
8P
King
Power Equipment Operators
Loaders: Elevating Type Belt
$54.33
7A
3C
8P
King
Power Equipment Operators
Locomotives, All
$54.75
7A
3C
8P
King
Power Equipment Operators
Material Transfer Device
$54.75
7A
3C
8P
King
Power Equipment Operators
Mechanics, All (leadmen -
$0.50 Per Hour Over Mechanic)
$55.79
7A
3C
8P
King
Power Equipment Operators
Motor Patrol Grader - Non-
finishing
$54.33
7A
3C
8P
King
Power Equipment Operators
Motor Patrol Graders, Finishing
$55.24
7A
3C
8P
King
Power Equipment Operators
Mucking Machine, Mole, Tunnel
Drill, Boring, Road Header
And/or Shield
$55.24
7A
3C
8P
King
Power Equipment Operators
Oil Distributors, Blower
Distribution Et Mulch Seeding
Operator
$51.97
7A
3C
8P
King
Power Equipment Operators
Outside Hoists (elevators And
Manlifts), Air Tuggers,strato
$54.33
7A
3C
8P
King
Power Equipment Operators
Overhead, Bridge Type Crane:
20 Tons Through 44 Tons
$54.75
7A
3C
8P
King
Power Equipment Operators
Overhead, Bridge Type: 100
Tons And Over
$55.79
7A
3C
8P
King
Power Equipment Operators
Overhead, Bridge Type: 45
Tons Through 99 Tons
$55.24
7A
3C
8P
King
Power Equipment Operators
Pavement Breaker
$51.97
7A
3C
8P
King
Power Equipment Operators
Pile Driver (other Than Crane
Mount)
$54.75
7A
3C
8P
King
Power Equipment Operators
Plant Oiler - Asphalt, Crusher
$54.33
7A
3C
8P
King
Power Equipment Operators
Posthole Digger, Mechanical
$51.97
7A
3C
8P
King
Power Equipment Operators
Power Plant
$51.97
7A
3C
8P
King
Power Equipment Operators
Pumps - Water
$51.97
7A
3C
8P
King
Power Equipment Operators
Quad 9, Hd 41, D10 And Over
$55.24
7A
3C
8P
King
Power Equipment Operators
Quick Tower - No Cab, Under
100 Feet In Height Based To
Boom
$51.97
7A
3C
8P
King
Power Equipment Operators
Remote Control Operator On
Rubber Tired Earth Moving
Equipment
$55.24
7A
3C
8P
King
Power Equipment Operators
Rigger And Bellman
$51.97
7A
3C
8P
King
Power Equipment Operators
Rollagon
$55.24
7A
3C
8P
King
Power Equipment Operators
Roller, Other Than Plant Mix
$51.97
7A
3C
8P
King
Power Equipment Operators
Roller, Plant Mix Or Multi -lift
Materials
$54.33
7A
3C
8P
King
Power Equipment Operators
Roto-mill, Roto-grinder
$54.75
7A
3C
8P
King
Power Equipment Operators
Saws - Concrete
$54.33
7A
3C
8P
King
Power Equipment Operators
Scraper, Self Propelled Under
45 Yards
$54.75
7A
3C
8P
King
Power Equipment Operators
Scrapers - Concrete Et Carry All
$54.33
7A
3C
8P
King
Power Equipment Operators
Scrapers, Self-propelled: 45
$55.24
7A
3C
8P
https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015
Page 10 of 17
Yards And Over
King
Power Equipment Operator s
Service Engineers - Equipment
$54.33
7A
3C
813
King
Power Equipment Operators
Shotcrete/gunite Equipment
$51.97
7A
3C
8P
King
Power Equipment Operators
Shovel , Excavator, Backhoe,
Tractors Under 15 Metric Tons.
$54.33
7A
3C
8P
King
Power Equipment Operators
Shovel, Excavator, Backhoe:
Over 30 Metric Tons To 50
Metric Tons
$55.24
7A
3C
8P
King
Power Equipment Operators
Shovel, Excavator, Backhoes,
Tractors: 15 To 30 Metric Tons
$54.75
7A
3C
8P
King
Power Equipment Operators
Shovel, Excavator, Backhoes:
Over 50 Metric Tons To 90
Metric Tons
$55.79
7A
3C
8P
King
Power Equipment Operators
Shovel, Excavator, Backhoes:
Over 90 Metric Tons
$56.36
7A
3C
8P
King
Power Equipment Operators
Slipform Pavers
$55.24
7A
3C
8P
King
Power Equipment Operators
Spreader, Topsider Et
Screedman
$55.24
7A
3C
8P
King
Power Equipment Operators
Subgrader Trimmer
$54.75
7A
3C
8P
King
Power Equipment Operators
Tower Bucket Elevators
$54.33
7A
3C
8P
King
Power Equipment Operators
Tower Crane Over 175'in
Height, Base To Boom
$56.36
7A
3C
8P
King
Power Equipment Operators
Tower Crane Up To 175' In
Height Base To Boom
$55.79
7A
3C
8P
King
Power Equipment Operators
Transporters, Alt Track Or
Truck Type
$55.24
7A
3C
8P
King
Power Equipment Operators
Trenching Machines
$54.33
7A
3C
8P
King
Power Equipment Operators
Truck Crane Oiler/driver - 100
Tons And Over
$54.75
7A
3C
8P
King
Power Equipment Operators
Truck Crane Oiler/driver Under
100 Tons
$54.33
7A
3C
8P
King
Power Equipment Operators
Truck Mount Portable Conveyor
$54.75
7A
3C
8P
King
Power Equipment Operators
Welder
$55.241
7A
3C
8P
King
Power Equipment Operators
Wheel Tractors, Farmall Type
$51.97
7A
3C
8P
King
Power Equipment Operators
Yo Yo Pay Dozer
$54.75
7A
3C
8P
King
Power Equipment Operators-
Asphalt Plant Operators
$55.24
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Assistant Engineer
$51.97
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Barrier Machine (zipper)
$54.75
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Batch Plant Operator,
Concrete
$54.75
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Bobcat
$51.97
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Brokk - Remote Demolition
Equipment
$51.97
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Brooms
$51.97
7A
3C
8P
Underground Sewer Et Water
https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015
Page 11 of 17
King
Power Equipment Operators-
Bump Cutter
$54.75
7A
3C
8P
Underground Sewer It Water
King
Power Equipment Operators-
Cableways
$55.24
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Chipper
$54.75
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Compressor
$51.97
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Concrete Pump: Truck Mount
With Boom Attachment Over 42
M
$55.24
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Concrete Finish Machine -laser
Screed
$51.97
7A
3C
8P
Underground Sewer 8t Water
King
Power Equipment Operators-
Concrete Pump - Mounted Or
Trailer High Pressure Line
Pump, Pump High Pressure.
$54.33
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Concrete Pump: Truck Mount
With Boom Attachment Up To
42m
$54.75
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Conveyors
$54.33
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Cranes: 20 Tons Through 44
Tons With Attachments
$54.75
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Cranes: 100 Tons Through 199
Tons, Or 150' Of Boom
(Including Jib With
Attachments)
$55.79
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Cranes: 200 Tons To 300 Tons,
Or 250' Of Boom (including Jib
With Attachments)
$56.36
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Cranes: 45 Tons Through 99
Tons, Under 150' Of Boom
(including Jib With
Attachments)
$55.24
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Cranes: A -frame - 10 Tons And
Under
$51.97
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Cranes: Friction 100 Tons
Through 199 Tons
$56.36
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Cranes: Friction Over 200 Tons
$56.92
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Cranes: Over 300 Tons Or 300'
Of Boom (including Jib With
Attachments)
$56.92
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Cranes: Through 19 Tons With
Attachments A -frame Over 10
Tons
$54.33
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Crusher
$54.75
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Deck Engineer/deck Winches
(power)
$54.75
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Derricks, On Building Work
$55.24
7A
3C
8P
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015
Page 12 of 17
Underground Sewer Et Water
King
Power Equipment Operators-
Dozers D-9 Et Under
$54.33
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Drill Oilers: Auger Type, Truck
Or Crane Mount
$54.33
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Drilling Machine
$54.75
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Elevator And Man -lift:
Permanent And Shaft Type
$51.97
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Finishing Machine, Bidwell And
Gamaco Et Similar Equipment
$54.75
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Forklift: 3000 Lbs And Over
With Attachments
$54.33
7A
3C
8P
Underground Sewer &t Water
King
Power Equipment Operators-
Forklifts: Under 3000 Lbs. With
Attachments
$51.97
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Grade Engineer: Using Blue
Prints, Cut Sheets, Etc
$54.75
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Gradechecker/stakeman
$51.97
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Guardrail Punch
$54.75
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Hard Tail End Dump
Articulating Off- Road
Equipment 45 Yards. Et Over
$55.24
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Hard Tail End Dump
Articulating Off -road
Equipment Under 45 Yards
$54.75
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Horizontal/directional Drill
Locator
$54.33
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Horizontal/directional Drill
Operator
$54.75
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Hydralifts/boom Trucks Over
10 Tons
$54.33
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Hydralifts/boom Trucks, 10
Tons And Under
$51.97
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Loader, Overhead 8 Yards. Et
Over
$55.79
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Loader, Overhead, 6 Yards. But
Not Including 8 Yards
$55.24
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Loaders, Overhead Under 6
Yards
$54.75
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Loaders, Plant Feed
$54.75
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Loaders: Elevating Type Belt
$54.33
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Locomotives, All
$54.75
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Material Transfer Device
$54.75
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Mechanics, All (leadmen -
$55.79
7A
3C
8P
https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015
Page 13 of 17
Underground Sewer Et Water
$0.50 Per Hour Over Mechanic)
King
Power Equipment Operators-
Motor Patrol Grader - Non-
finishing
$54.33
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Motor Patrol Graders, Finishing
$55.24
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Mucking Machine, Mole, Tunnel
Drill, Boring, Road Header
And/or Shield
$55.24
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Oil Distributors, Blower
Distribution Et Mulch Seeding
Operator
$51.97
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Outside Hoists (elevators And
Manlifts), Air Tuggers,strato
$54.33
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Overhead, Bridge Type Crane:
20 Tons Through 44 Tons
$54.75
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Overhead, Bridge Type: 100
Tons And Over
$55.79
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Overhead, Bridge Type: 45
Tons Through 99 Tons
$55.24
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Pavement Breaker
$51.97
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Pile Driver (other Than Crane
Mount)
$54.75
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Plant Oiler - Asphalt, Crusher
$54.33
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Posthole Digger, Mechanical
$51.97
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Power Plant
$51.97
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Pumps - Water
$51.97
7A
3C
8P
Underground Sewer E; Water
King
Power Equipment Operators-
Quad 9, Hd 41, D10 And Over
$55.24
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Quick Tower - No Cab, Under
100 Feet In Height Based To
Boom
$51.97
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Remote Control Operator On
Rubber Tired Earth Moving
Equipment
$55.24
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Rigger And BeRman
$51.97
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Rollagon
$55.24
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Roller, Other Than Plant Mix
$51.97
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Roller, Plant Mix Or Multi -lift
Materials
$54.33
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Roto-mill, Roto-grinder
$54.75
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Saws - Concrete
$54.33
7A
3C
8P
littps:Hfortress.wa.gov/lni/wagelookup/prvWageIookup.aspx 07/13/2015
Page 14 of 17
Underground Sewer Et Water
King
Power Equipment Operators-
Scraper, Self Propelled Under
45 Yards
$54.75
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Scrapers - Concrete Et Carry All
$54.33
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Scrapers, Self-propelled: 45
Yards And Over
$55.24
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Service Engineers - Equipment
$54.33
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Shotcrete/gunite Equipment
$51.97
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Shovel , Excavator, Backhoe,
Tractors Under 15 Metric Tons.
$54.33
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Shovel, Excavator, Backhoe:
Over 30 Metric Tons To 50
Metric Tons
$55.24
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Shovel, Excavator, Backhoes,
Tractors: 15 To 30 Metric Tons
$54.75
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Shovel, Excavator, Backhoes:
Over 50 Metric Tons To 90
Metric Tons
$55.79
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Shovel, Excavator, Backhoes:
Over 90 Metric Tons
$56.36
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Slipform Pavers
$55.24
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Spreader, Topsider Et
Screedman
$55.24
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Subgrader Trimmer
$54.75
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Tower Bucket Elevators
$54.33
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Tower Crane Over 175'in
Height, Base To Boom
$56.36
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Tower Crane Up To 175' In
Height Base To Boom
$55.79
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Transporters, All Track Or
Truck Type
$55.24
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Trenching Machines
$54.33
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Truck Crane Oiler/driver - 100
Tons And Over
$54.75
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Truck Crane Oiler/driver Under
100 Tons
$54.33
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Truck Mount Portable Conveyor
$54.75
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Welder
$55.24
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Wheel Tractors, Farman Type
$51.97
7A
3C
8P
Underground Sewer Et Water
King
Power Equipment Operators-
Yo Yo Pay Dozer
$54.75
7A
3C
8P
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015
Page 15 of 17
Underground Sewer Et Water
King
Power Line Clearance Tree
Journey Level In Charge
$45.75
5A
4A
Trimmers
King
Power Line Clearance Tree
Spray Person
$43.38
5A
4A
Trimmers
King
Power Line Clearance Tree
Tree Equipment Operator
$45.75
5A
4A
Trimmers
King
Power Line Clearance Tree
Tree Trimmer
$40.84
5A
4A
Trimmers
King
Power Line Clearance Tree
Tree Trimmer Groundperson
$30.74
5A
4A
Trimmers
King
Refrigeration Et Air
Conditioning Mechanics
Journey Level
$73.51
6Z
1G
King
Residential Brick Mason
Journey Level
$51.32
5A
1M
King
Residential Carpenters
Journey Level
$28.20
1
King
Residential Cement Masons
Journey Level
$22.64
1
King
Residential Drywall Applicators
Journey Level
$40.14
5D
4C
King
Residential Drywall Tapers
Journey Level
$52.37
5P
1 E
King
Residential Electricians
Journey Level
$30.44
1
King
Residential Glaziers
Journey Level
$37.30
7L
1 H
King
Residential Insulation
Aaplicators
Journey Level
$26.28
1
King
Residential Laborers
Journey Level
$23.03
1
King
Residential Marble Setters
Journey Level
$24.09
1
King
Residential Painters
Journey Level
$24.46
1
King
Residential Plumbers Et
Pipefitters
Journey Level
$34.69
1
King
Residential Refrigeration Et Air
Journey Level
$73.51
6Z
1G
Conditioning Mechanics
King
Residential Sheet Metal
Workers
Journey Level (Field or Shop)
$42.58
7F
1 R
King
Residential Soft Floor Lavers
Journey Level
$42.41
5A
3D
King
Residential Sprinkler Fitters
Journey Level
$42.48
5C
2R
(Fire Protection)
King
Residential Stone Masons
Journey Level
$51.32
5A
1M
King
Residential Terrazzo Workers
Journey Level
$46.96
5A
1M
King
Residential Terrazzo/Tile
Journey Level
$21.46
1
Finishers
King
Residential Tile Setters
Journey Level
$25.17
1
King
Roofers
Journey Level
$45.71
5A
3H
King
Roofers
Using Irritable Bituminous
Materials
$48.71
5A
3H
King
Sheet Metal Workers
Journey Level (Field or Shop)
$70.37
7F
1 E
King
Shipbuilding Et Ship Repair
Boilermaker
$39.82
7M
1H
King
Shipbuilding Et Ship Repair
Carpenter
$39.24
7T
2B
King
Shipbuilding Et Ship Repair
Electrician
$40.16
7T
4B
King
Shipbuilding Et Ship Repair
Heat Et Frost Insulator
$61.18
5J
1 S
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015
Page 16 of 17
King
Shipbuilding Et Ship Repair
Laborer
$40.19
7T
4B
King
Shipbuilding Et Ship Repair
Machinist
$40.18
7T
4B
King
Shipbuilding Et Ship Repair
Operator
$40.11
7T
4B
King
Shipbuilding Et Ship Repair
Painter
$40.16
7T
4B
King
Shipbuilding Et Ship Repair
Pipefitter
$40.11
7T
4B
King
Shipbuilding Et Ship Repair
Rigger
$40.19
7T
4B
King
Shipbuilding Et Ship Repair
Sheet Metal
$40.14
7T
4B
King
Shipbuilding Et Ship Repair
Shipfitter
$40.19
7T
4B
King
Shipbuilding 4 Ship Repair
Trucker
$40.03
7T
4B
King
Shipbuilding Et Ship Repair
Warehouse
$40.08
7T
4B
King
Shipbuilding Et Ship Repair
Welder/Burner
$40.19
7T
4B
King
Sign Makers Et Installers
(Electrical)
Sign Installer
$22.92
1
King
Sign Makers Et Installers
(Electrical)
Sign Maker
$21.36
1
King
Sign Makers Et Installers (Non-
Sign Installer
$27.28
1
Electrical )
King
Sign Makers Et Installers (Non-
Sign Maker
$33.25
1
Electrical)
King
Soft Floor Lavers
Journey Level
$42.41
5A
3D
King
Solar Controls For Windows
Journey Level
$12.44
1
King
Sprinkler Fitters (Fire
Protection)
Journey Level
$69.74
5C
1X
King
Stage Rigging, Mechanics (Non
Journey Level
$13.23
1
Structural}
King
Stone Masons
Journey Level
$51.32
5A
1M
King
Street And Parking Lot
Sweeper Workers
Journey Level
$19.09
1
King
Surveyors
Assistant Construction Site
Surveyor
$54.33
7A
3C
8P
King
Surveyors
Chainman
$53.81
7A
3C
8P
King
Surveyors
Construction Site Surveyor
$55.241
7A
3C
8P
King
Telecommunication
Technicians
Journey Level
$22.76
1
King
Telephone Line Construction -
Cable Splicer
$36.96
5A
2B
Outside
King
Telephone Line Construction -
Hole Digger/Ground Person
$20.49
5A
2B
Outside
King
Telephone Line Construction -
Installer (Repairer)
$35.40
5A
2B
Outside
King
Telephone Line Construction -
Special Aparatus Installer 1
$36.96
5A
2B
Outside
King
Telephone Line Construction -
Special Apparatus Installer II
$36.19
5A
2B
Outside
King
Telephone Line Construction -
Telephone Equipment Operator
(Heavy)
$36.96
5A
2B
Outside
King
Telephone Line Construction -
Telephone Equipment Operator
(Light)
$34.34
5A
2B
Outside
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015
Paue 17 of 17
King
Telephone Line Construction,
Telephone Lineperson
$34.34
5A
2B
Outside
King
Telephone Line Construction_ -
Television Groundperson
$19.45
5A
2B
Outside
King
Telephone Line Construction -
Television Lineperson/Installer
$25.89
5A
2B
Outside
King
Telephone Line Construction -
Television System Technician
$30.97
5A
2B
Outside
King
Telephone Line Construction -
Television Technician
$27.77
5A
2B
Outside
King
Telephone Line Construction -
Tree Trimmer
$34.34
5A
2B
Outside
King
Terrazzo Workers
Journey Level
$46.96
5A
1M
King
Tile Setters
Journey Level
$21.651
1
King
Tile, Marble Et Terrazzo
Finishers
Finisher
$37.79
5A
1 B
King
Traffic Control Stripers
Journey Level
$43.11
7A
1 K
King
Truck Drivers
Asphalt Mix Over 16 Yards (W.
WA -Joint Council 28)
$49.85
5D
3A
8L
King
Truck Drivers
Asphalt Mix To 16 Yards (W.
WA -Joint Council 28)
$49.01
5D
3A
8L
King
Truck Drivers
Dump Truck I* Trailer
$49.85
5D
3A
8L
King
Truck Drivers
Dump Truck (W. WA -Joint
Council 28)
$49.01
5D
3A
8L
King
Truck Drivers
Other Trucks (W. WA -Joint
Council 28)
$49.85
5D
3A
8L
King
Truck Drivers
Transit Mixer
$43.23
1
King
Well Drillers Et Irrigation Pump
Irrigation Pump Installer
$17.71
1
Installers
King
Well Drillers Et Irrigation Pump
Oiler
$12.97
1
Installers
King
Well Drillers & Irrigation Pump
Well Driller
$18.00
1
Installers
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 07/13/2015
5117
1
864551
1508
LAw
$ 645511
1 50 0A