HomeMy WebLinkAboutRe_ NE 38th SP SD Change #3 CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Yes, we would just oversize the footing drain to 6" for the tiered wall and drain to the proposed CB to the north. See sketch below. On Monday, August 7, 2023 at 12:50:49 PM PDT, Huy Huynh <hhuynh@rentonwa.gov> wrote: Hello Steve, Please send me a quick sketch of your proposal. Are you referring to the footing drain for the wall? Huy Huynh | Civil Engineer II City of Renton | CED | Development Engineering Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Frentonwa.gov%2Fcms%2FOne.aspx%3FportalId%3D7922741%26pageId%3D17625638&data=05%7C01%7CHHuynh%40rentonwa.gov%7C 0f84e15e34ff49d26c3908db9824855d%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638271054888935650%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7 C%7C&sdata=I9pe0RZUY6%2FAx9%2BmOurpe3yVklyPbwQzb0kvdHVJ%2FN4%3D&reserved=0> | Online Applications and Inspections <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fpermitting.renton wa.gov%2F%23%2Fhome&data=05%7C01%7CHHuynh%40rentonwa.gov%7C0f84e15e34ff49d26c3908db9824855d%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638271054888935650%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDA iLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=YDEL6pWhQh4OjryGw6t2sfk%2BgT350wIk3rsK6gJIPTQ%3D&reserved=0> (425) 430 -7384 | HHuynh@rentonwa.gov From: Steven <steve@pellc.org> Sent: Monday, August 7, 2023 12:18 PM To: Patrick Decaro <PDecaro@Rentonwa.gov>; Navdeep Gill <navdeepgill@msn.com>; Joseph Tilson <rockytopearthworkllc.jt@gmail.com>; Huy Huynh <HHuynh@rentonwa.gov> Subject: Re: NE 38th SP SD Change #3 CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Huy, You are correct. The upper runoff from upstream of that wall area is included within the vault calculations. We could take the wall drainage pipe and route that area within the perforated wall pipe into a 6" PVC and connect to the internal street storm. This would keep the calculations consistent in the TIR and the vault orifices/sizing can be maintained. Let me know if this is acceptable. Thank you, Steven Lee 206.501.5708 On Friday, August 4, 2023 at 02:37:24 PM PDT, Huy Huynh <hhuynh@rentonwa.gov <mailto:hhuynh@rentonwa.gov> > wrote: Hello Steve and Navdeep, The proposed change along Lincoln seems reasonable as the TIR does not mention anything related to having the other vault as bypass for the runoff from Lincoln. The changes to the French drain; however, we would need an addendum to the TIR showing the calculation of the vault without the runoff from Carpenter short plat and how does it affect the orifice size Huy Huynh | Civil Engineer II City of Renton | CED | Development Engineering Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Frentonwa.gov%2Fcms%2FOne.aspx%3FportalId%3D7922741%26pageId%3D17625638&data=05%7C01%7CHHuynh%40rentonwa.gov%7C 0f84e15e34ff49d26c3908db9824855d%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638271054888935650%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7 C%7C&sdata=I9pe0RZUY6%2FAx9%2BmOurpe3yVklyPbwQzb0kvdHVJ%2FN4%3D&reserved=0> | Online Applications and Inspections <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fpermitting.renton wa.gov%2F%23%2Fhome&data=05%7C01%7CHHuynh%40rentonwa.gov%7C0f84e15e34ff49d26c3908db9824855d%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638271054888935650%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDA iLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=YDEL6pWhQh4OjryGw6t2sfk%2BgT350wIk3rsK6gJIPTQ%3D&reserved=0> (425) 430 -7384 | HHuynh@rentonwa.gov <mailto:HHuynh@rentonwa.gov> From: Steven <steve@pellc.org <mailto:steve@pellc.org> > Sent: Tuesday, August 1, 2023 8:44 AM To: Huy Huynh <HHuynh@rentonwa.gov <mailto:HHuynh@rentonwa.gov> >; Patrick Decaro <PDecaro@Rentonwa.gov <mailto:PDecaro@Rentonwa.gov> >; Navdeep Gill <navdeepgill@msn.com <mailto:navdeepgill@msn.com> >; Joseph Tilson <rockytopearthworkllc.jt@gmail.com <mailto:rockytopearthworkllc.jt@gmail.com> > Subject: Re: NE 38th SP SD Change #3 CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. I did catch an error. The slope of the proposed pipe is 3.78%. Thanks, Steve 206.501.5708 On Tuesday, August 1, 2023 at 08:34:48 AM PDT, Steven <steve@pellc.org <mailto:steve@pellc.org> > wrote: Morning Huy, Attached is a request for a slight change to CB Lincoln-1. Just moving it uphill approximately 11' up the hill and so we can have a direct 90 degree into the correct 18" and not into the other plat drainage structure to the east requested in the last change (which was incorrect). This maintains the same basin drainage and does not overload a predesigned vault to the east on the wrong CB requested from Navdeep's team request previously. Thanks, Steve ⢈ク圻絟馵詗礇䴻鄁섑⠰娟๒ᅊᄽ륖Ѷ踑姅눋㒿끐࠾遛・ό�닭�₊О‏䍄��Ӄ쑢⩜钓᱉롧㻼컻糠쩚䠽ٌ鬑䢂륌ླᱝ�哾ࠗ즼䡓龥⋲䴨㒇炪⑮䦕䈩䍰⸗ᖮ鮎꽮ᶇ顶䞑☦⊤뻊�♫掏�஦뉀粁㒒킘⺊ᰁ웇ꎨ誎岬䟑诎븯멨冡愑짿웁苧뗀遀井꜈ࠌ绂笟뙋紳瓺鏧㹏徶蒏ﱜ삶₹ܨ⢺ⷓ띹盝큡疈臠嘇黺砤귫䲷찰돯鲟﮾�锖맡�齧ﶥ�诞㒨蹓簌ܕ訉퓫�灖�衩�曾枮銻皴嫭�쭩庻窽先螲똼僤ᐉ充ഊ诱쬈ꝱၢ㏁ꊝ鬾偎㘧 娉朞锪囏ꂅ깎耺龝㽏퓽뷔㵱੧�엢鶋뗚筫癋몆甝愼⛍찮뺖ﭽ㴺ႬꥠᏣἯ�晱�蟡욍嵀揄☇ᤴ쫷ﴆ몂뤴菺ㅐ᪹掀隕脇ᑖꔴᇪ楇炐倩䙁둸�ܨ㙯印꜑肫씘닯ю≑ﶶ�इ㚥㬜냛ᡭ综ᥔↅሌ�쾖寰≁綈ﱬﲿ⻇㤯犇발㯧뀐䓃뙲鵥㟿쟼뻅䶲힒⥄ꯓ⽗䠳볐ꛩ첛⣻䜸㳢픯⏇퓗ᦌ䰳ﮋ﮾毮̄쮈撈龧멾斷豮ㄘӂ㒾Ҫ灁锒ⳃ瀓―状፽券É颺萡᷒䖮ᚋ饦韋᜛脂Ҧқ௡Ⱆ丰ꂆû졥ꓯ錓ງ樝ໜ텾炀퀭䄸掷뱛ὦ䜸ꁀ㹋餷∏睝河㒙鉩翙઺殒렓롦炿₽ ﯘ㿡ႅ꺞쌲ꥧ擴遲삍ꇝ݃䥯漴熆﯄ꗯ瘗ʭ厕䤪柾ᔌ�챵韵↮⥀쟱艿䧻闒䕩ᑑḥө狵켓⚃偛鐯䶈䡜㮣⳱䧳⻼⻂鎃讒뿙�鼤铅�押ૅ嚧媭헞㎱릶ᄅ᜵畷�䶽緽ꛓ晍팞뼁吟⢟၆ᇂᇄ㿃鎤㉎০갿躧귐㝛襯殏㭌齎⺽