HomeMy WebLinkAboutR-425204N
u7
I
ocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878
DocuSign
Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878
� 5" MAX.
DRAINAGE GRATE TRIM
Q/�
W
3-30, SEE NOTE 2.3 3"-5", SEE NOTE 2.2
`.
__- 8"-10" DIA.
GRATE FRAME
OVERFLOW BYPASS
ROLL SPACING
DEPENDS ON SOIL
TYPE AND SLOPE SEDIMENT, ORGANIC MATTER,
BELOW INLET GRATE DEVICE
STEEPNESS AND NATIVE SEEDS ARE, \
CAPTURED BEHIND THE ROLLS
SEDIMENT AND DEBRIS..+,'..a'x�s
STRAW ROLLS MUST BE WOODEN STAKE
PLACED ALONG SLOPE
CONTOURS
FILTERED
WATER
_4'
�
.
ADJACENT ROLLS SHALL
TIGHTLY ABUT
SECTION VIEW
DRAINAGE GRATE
y
(RECTANGULAR GRATE SHOWN) RETRIEVAL SYSTEM (TYP.)
NTS 1
NTS
�� LIVE STAKE
Not Used
Not Used-(:
C)
NOTES:
OVERFLOW BYPASS (TYP.)
1. CONDITIONS OF USE
1.1. INSTALL ON DISTURBED AREAS THAT REQUIRE IMMEDIATE EROSION PROTECTION.
BELOW INLET GRATE DEVICE
1.2. USE ON SLOPES REQUIRING STABILIZATION UNTIL PERMANENT VEGETATION CAN BE ESTABLISHED.
1.3. CAN BE USED ALONG THE PERIMETER OF A PROJECT, AS A CHECK DAM IN UNLINED DITCHES AND AROUND TEMPORARY STOCKPILES.
1.4. WATTLES CAN BE STAKED TO THE GROUND USING WILLOW CUTTINGS FOR ADDED REVEGETATION.
1.5. RILLING CAN OCCUR BENEATH AND BETWEEN WATTLES IF NOT PROPERLY ENTRENCHED, ALLOWING WATER TO PASS BELOW AND BETWEEN WATTLES.
2. DESIGN AND INSTALLATION SPECIFICATIONS
ISOMETRIC VIEW
2.1. IT IS CRITICAL THAT WATTLES ARE INSTALLED PERPENDICULAR TO THE FLOW DIRECTION AND PARALLEL TO THE SLOPE CONTOUR.
2.2. NARROW TRENCHES SHOULD BE DUG ACROSS THE SLOPE, ON CONTOUR, TO A DEPTH OF 3 TO 5 INCHES ON CLAY SOILS AND SOILS WITH GRADUAL SLOPES.
ON LOOSE SOILS, STEEP SLOPES, AND DURING HIGH RAINFALL EVENTS, THE TRENCHES SHOULD BE DUG TO A DEPTH OF 5 TO 7 INCHES, OR 1/2 TO 2/3 OF THE
NOTES:
THICKNESS OF THE WATTLE.
2.3. START CONSTRUCTION OF TRENCHES AND INSTALLING WATTLES FROM THE BASE OF THE SLOPE AND WORK UPHILL. EXCAVATED MATERIAL SHOULD BE
1. PROTECTION SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR
SPREAD EVENLY ALONG THE UPHILL SLOPE AND COMPACTED USING HAND TAMPING OR OTHER METHOD. CONSTRUCT TRENCHES AT CONTOUR INTERVALS
CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE CATCH BASIN WILL BE CONVEYED TO A SEDIMENT POND OR TRAP.
OF 3 TO 30 FEET APART DEPENDING ON THE STEEPNESS OF THE SLOPE, SOIL TYPE, AND RAINFALL. THE STEEPER THE SLOPE THE CLOSER TOGETHER THE
TRENCHES SHOULD BE CONSTRUCTED. VERTICAL DISTANCE BETWEEN WATTLES IS NOT TO EXCEED 10 FEET.
2. INLET PROTECTION SHALL BE USED TO PROTECT THE DRAINAGE SYSTEM.
2.4. INSTALL THE WATTLES SNUGLY INTO THE TRENCHES AND ABUT TIGHTLY END TO END. DO NOT OVERLAP THE ENDS.
2.5. INSTALL STAKES AT EACH END OF THE WATTLE, AND AT 4 FOOT CENTERS ALONG THE ENTIRE LENGTH OF THE WATTLE.
3. THE CONTRIBUTING DRAINAGE AREA MUST NOT BE LARGER THAN ONE ACRE.
2.6. IF REQUIRED, INSTALL PILOT HOLES FOR THE STAKES USING A STRAIGHT BAR TO DRIVE HOLES THROUGH THE WATTLE AND INTO THE SOIL.
2.7. AT A MINIMUM, WOODEN STAKES SHOULD BE APPROXIMATELY 3/4 X 3/4 X 24 INCHES. WILLOW CUTTINGS OR 318-INCH REBAR CAN ALSO BE USED FOR STAKES.
4. SIZE THE BELOW INLET GRATE DEVICE (BIGD) FOR THE STORMWATER STRUCTURE IT WILL SERVICE.
2.8. STAKES SHOULD BE DRIVEN THROUGH THE MIDDLE OF THE WATTLE, LEAVING 2 TO 3 INCHES OF THE STAKE PROTRUDING ABOVE THE WATTLE.
5. THE BIGD SHALL HAVE A BUILT-IN HIGH -FLOW RELIEF SYSTEM (OVERFLOW BYPASS).
3. MAINTENANCE STANDARDS
3.1. INSPECT WATTLES PRIOR TO FORECASTED RAIN, DAILY DURING EXTENDED RAIN EVENTS, AFTER RAIN EVENTS, WEEKLY DURING THE WET SEASON, AND AT
6. THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF THE BIGD WITHOUT SPILLING THE COLLECTED MATERIAL.
TWO WEEK INTERVALS AT ALL OTHER TIMES OF THE YEAR.
7. PERFORM MAINTENANCE IN ACCORDANCE WITH STANDARD SPECIFICATION 8-01.3(15).
3.2. REPAIR OR REPLACE SPLIT, TORN, RAVELING, OR SLUMPING WATTLES
3.3. REMOVE SEDIMENT ACCUMULATIONS WHEN EXCEEDING 1/2 THE HEIGHT BETWEEN THE TOP OF THE WATTLE AND THE GROUND SURFACE.
8. ANY SEDIMENT IN THE CATCH BASIN INSERT SHALL BE REMOVED WHEN THE SEDIMENT HAS FILLED ONE-THIRD OF THE AVAILABLE
STORAGE. THE FILTER MEDIA FOR THE INSERT SHALL BE CLEANED OR REPLACED AT LEAST MONTHLY.
UNLESS OTHERWISE NOTED, DRAWING IS NOTTO SCALE (NTS)
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
c ,} PUBLIC WORKS
STRAW WATTLES
STD. PLAN - 213.40
oftk
v-
PUBLIC WORKS
CATCH BASIN INSERT
STD. PLAN - 216.30
:45 AN
:45 AP
APPR Eo
GAZ 9/28/2018 I
APPR ED:
GAZ 9/28/2018 I
DEPARTMENT
DEPARTMENT
Public Works Administrator DATE
Public Works Administrator DATE
NTS
NTS
NTS
NTS
n
a
Not Used
Not Used
Straw Wattles
Catch Basin Insert
R-425204
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
NTS
NTS
1 o
Not Used--(:
Not Used
NTS 1 1
Not Used
A. JAB
CONSTRUCTION RECORD DRAWING
ti of w�sy� O
ADDENDUM NO. 1
JAJ 3/6/23 SURVEYED: SCALE:
DATE:
THIS CONSTRUCTION RECORD DRAWING IS A COPY OF A CAD FILE
,�� � �
2
PERMIT COMMENTS
HORIZONTAL: N D 1983/1991
JAJ /14/2
CITY
OF
RENTON PARK ELEMENTARY SCHOOL
10/27/2023
PREPARED BY JACOBSON CONSULTING ENGINEERS, AND HAS BEEN
W
COR NO. 01
DESIGNED:ESSE
JAJ /03/2%
0
FIELDBOOK:
EDITED TO REFLECT THE CONSTRUCTED STORM SYSTEM AND SITE
�
s
4
RECORD DRAWINGS
DRAWN:
JAJ /21/2 DJD
RENTON
ADA AND SAFETY UPGRADES
PAGE:
DRAWING NO:
IMPROVEMENTS. FIELD DIMENSIONS WERE PROVIDED BY RW SCOTT ONE INCH
CONSTRUCTION AND PROVIDED TO JACOBSON CONSULTING
43667
�tc�sT�R�° ♦
s���NAL �
DATUM
CHECKEDSSE
AT FULL SCALE Planning/Building/Public
Works
Dept.
TESC DETAILS
C 110
E I N G I N E E RS IN OCTO B E R 2023.
IF NOT ONE INCH
SCALE ACCORDINGLY
SHEET: OR
N0. REVISION BY DATE APPR APPROVED:
2 2I WZ4
1
1
4 OF 11
N
N
CM
T
C]
CM
N