Loading...
HomeMy WebLinkAboutP_plans_NWGourmetFoods_20170627_V1 R3.1BACON HOLDING PRODUCTION AIR UNIT 1 AIR UNIT 2 AIR UNIT 3 AIR UNIT 4 (on roof) CONDENSING UNIT 5'-0" (typical)5'-0" 5'-2" 24'-0" 8'-4" 1-3/8" Suction 1/2" Liquid 1-3/8" Suction 1/2" Liquid 1-3/8" Suction 1/2" Liquid 1-3/8" Suction 1/2" Liquid 2-1/8" Suction 7/8" Liquid BACON HOLDING PRODUCTION AIR UNIT 1 AIR UNIT 2 AIR UNIT 3 AIR UNIT 4 (on roof) CONDENSING UNIT S T 3/4" CD Existing drain* 3/4" CD 3/4" CD 3/4" CD 3/4" CD CCSAs noted5-26-2017- R3.1 --EQUIPMENT LOCATIONS & PIPING LAYOUT REFRIGERATION CONDENSATE DRAIN & ELECTRICAL DEVICES NW GOURMET FOODSRenton, WA 98057600 SW 7th StreetELECTRICAL SYMBOLS LEGEND S T Liquid line solenoid (single solenoid for both air units - on roof) Temp sensor * Field verify location of existing drain. M17003817 / PR17-000425 RECEIVED 08/15/2017 kjpeterson BUILDING DIVISIONAPPROVED BUILDING DIVISION THIS SET OF APPROVED PLANS MUST BE ON THE JOB AT ALL TIMES DURING CONSTRUCTION. THIS BUILDING IS NOT TO BE OCCUPIED UNTIL AFTER FINAL INSPECTION BY THE RENTON BUILDING DIVISION AND RECEIPT OF CERTIFICATE OF OCCUPANCY. APPROVAL SHALL NOT BE CONSTRUED AS THE AUTHORITY TO VIOLATE OR CANCEL ANY PROVISIONS OF CODES, ORDINANCES, OR OTHER REGULATIONS ENFORCED BY THIS CITY. DATE: 09/05/2017