HomeMy WebLinkAboutP_plans_NWGourmetFoods_20170627_V1 R3.1BACON HOLDING PRODUCTION
AIR UNIT 1 AIR UNIT 2 AIR UNIT 3 AIR UNIT 4
(on roof)
CONDENSING UNIT
5'-0"
(typical)5'-0"
5'-2"
24'-0"
8'-4"
1-3/8" Suction
1/2" Liquid
1-3/8" Suction
1/2" Liquid 1-3/8" Suction
1/2" Liquid
1-3/8" Suction
1/2" Liquid
2-1/8" Suction
7/8" Liquid
BACON HOLDING PRODUCTION
AIR UNIT 1 AIR UNIT 2 AIR UNIT 3 AIR UNIT 4
(on roof)
CONDENSING UNIT
S
T
3/4" CD
Existing drain*
3/4" CD 3/4" CD 3/4" CD 3/4" CD
CCSAs noted5-26-2017-
R3.1 --EQUIPMENT LOCATIONS & PIPING LAYOUT REFRIGERATION CONDENSATE DRAIN & ELECTRICAL DEVICES NW GOURMET FOODSRenton, WA 98057600 SW 7th StreetELECTRICAL SYMBOLS LEGEND
S
T
Liquid line solenoid (single solenoid for both air units - on roof)
Temp sensor
* Field verify location of existing drain.
M17003817 / PR17-000425
RECEIVED
08/15/2017
kjpeterson
BUILDING DIVISIONAPPROVED
BUILDING DIVISION
THIS SET OF APPROVED PLANS MUST BE ON THE JOB AT ALL
TIMES DURING CONSTRUCTION. THIS BUILDING IS NOT TO BE
OCCUPIED UNTIL AFTER FINAL INSPECTION BY THE RENTON
BUILDING DIVISION AND RECEIPT OF CERTIFICATE OF
OCCUPANCY.
APPROVAL SHALL NOT BE CONSTRUED AS THE AUTHORITY TO
VIOLATE OR CANCEL ANY PROVISIONS OF CODES, ORDINANCES,
OR OTHER REGULATIONS ENFORCED BY THIS CITY.
DATE: 09/05/2017