Loading...
HomeMy WebLinkAbout7945.04 E 2023 0808Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 3 Report ID 7945.04 E 2023 0808 Date Tue 8/8/2023 Weather 70°F Cloudy Arrival/Departure Time(s) 9:30AM; 10:15AM Travel Time (hr)0.75 Project Name Canopy Property Location 413 Lincoln Ave NE, Renton ESNW Rep. & Phone Willem Scherwin | 206 793 8569 Client Info/Contact Century Communities | Stacia Bloom General Contractor Info/Contact Contractor #2 Info/Contact Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. ESNW rep was onsite to observe vault footing drain and storm main on NE 40th St. Vault Footing Drain Upon arrival onsite, ESNW rep observed the contractor place the footing drain around the exterior of the footing. Rep observed the contactor placing a 4” perforated drainage pipe around the base of the footing, bedded in 7/8th inch washed rock. The washed rock and drainage pipe were wrapped in geotextile nonwoven fabric. Storm Main ESNW rep observed the contractor had excavated approximately two and a half feet deep into native soil. Rep observed the contractor place the pipe and backfill the excavation with 1 ¼” minus crushed rock. ESNW rep observwd the contractor spray the rock with water and compact it with a hoe pack. ESNW rep took compaction tests and observed adequate comapction of at least 95% of the modified proctor at the tested locations. Please see map and table below. Test Number Test Location Elevation Reference Proctor Maximum Dry Density (pcf) Test Moisture (%) Test Dry Density (pcf) % of MDD 166 Storm Main SG 7 135.9 7.4 128.6 95 167 Storm Main SG 7 135.9 7.8 129.0 95 Report ID 7945.04 E 2023 0808 Page 2 of 4 Earth Solutions NW, LLC Report ID 7945.04 E 2023 0808 Page 3 of 4 Earth Solutions NW, LLC Report ID 7945.04 E 2023 0808 Page 4 of 4 Earth Solutions NW, LLC Storm Main 166 167