HomeMy WebLinkAboutRE_ Sunset Harrington Submittals_pdfRyan,
The submittal is approved. You are correct that you will need 2 left arrows due to the ped button field modification we made.
From: Ryan Covington <ryan@oakhillsbuilds.com>
Sent: Monday, August 07, 2023 12:34 PM
To: Eric Cutshall <ECutshall@Rentonwa.gov>; Brad Stocco <BStocco@Rentonwa.gov>
Cc: Rick Noble <rickn@oakhillsbuilds.com>
Subject: Sunset Harrington Submittals.pdf
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.
Good afternoon,
At the link below are the submittals for the lighting and crosswalk pushbuttons on Sunset Boulevard. After review the only thing I’m seeing is that the push buttons should be 2 left
since we swapped the button locations at our on site meeting a few weeks ago. Please let me know if you have any questions.
https://allenbradbury.egnyte.com/dl/VoTTA0b4s3
Thank you,
Ryan
Ryan Covington │ Project Manager │ Oak Hills Construction, LLC
7802 Pacific Hwy E. | Milton, WA 98354 | office 253.218.2288
mobile 417.283.1076 │ fax 253.944.1049 │email: ryan@oakhillsbuilds.com <mailto:ryan@oakhillsbuilds.com>
website: www.oakhillsbuilds.com <http://www.oakhillsbuilds.com/>