Loading...
HomeMy WebLinkAboutD-397610115 115 OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHW ALRU ALRU ALRU PSMETHPLTHPLTSHE OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHW TSHE TSHE ALRU PSME PSME PSME THPL SITE 2 - PLANTING PLAN L1.01 10O:\proj\Y2018\18-06779-000\CAD\Dwg\record\Planting-rcd.dwg | 12/5/2022 9:58 AM | Eric MarshallAT FULL SIZE, IF NOT ONEINCH SCALE ACCORDINGLYDRAWN: CHECKED: APPROVED: DATE: PROJECT NO:ONE INCH© 2022 Herrera Environmental Consultants, Inc. All rights reserved.DESIGNED: DESIGNED: DESIGNED: SCALE: DRAWN: DRAWING NO: SHEET NO: OFNo.REVISION BY APP'D DATE CALL 811 BEFORE YOU DIG RECORD DRAWINGS NOVEMBER 2022 18-06779-001 MADSEN CREEK FLOOD RISK REDUCTION PROJECT 15 J. WAGGONER R. GLEASON C. WEST AS NOTED E. MARSHALL R. GLEASON M. EWBANK M. EWBANK 10 0 10 20 1"=10' MADSEN CREEK HIGH FLOW BYPASS CHANNEL LEGEND: THPL ALRU ALNUS RUBRA THUJA PLICATA PSME PSEUDOTSUGA MENZIESII TSHE TSUGA HETEROPHYLLA EROSION CONTROL SEED MIX EXISTING TREES NOTES: 1. PLACE 4-FOOT WIDE, 3-INCH DEPTH MULCH RING AROUND EACH TREE. PLACE 2-FOOT, 3-INCH DEPTH, MULCH RING AROUND EACH SHRUB 2. NO TREES TO BE PLANTED ON BERM. PLACE ALL TREES SOUTH OF THE BERM PER PLANTING PLAN. 3. SEE SHEET L1.11 FOR PLANT SCHEDULE. TREES SHOULD BE PLANTED A MINIMUM SPACING PER PLANT SCHEDULE. SITE 2 NATIVE SHRUB ZONE ALL PLANTING WORK TO BE COMPLETED TO WEST OF EASEMENT BOUNDARY PROTECT EXISTING FENCE DURING PLANTING WORK, TYP BIG LEAF MAPLE TO BE RETAINED, SEE DWG C2.10 R. GLEASON J. WAGGONER K. FORESTER J. WAGGONER K. FORESTER SEE SHEET L1.10 FOR TREE SPACING AND PLANTING DETAILS. RECORD DRAWINGS: THE REVISIONS TO THESE CONTRACT DOCUMENTS REFLECT CHANGES IN THE WORK MADE DURING CONSTRUCTION BASED ON CHANGE ORDERS AND DATA FURNISHED BY THE CONTRACTOR. THESE RECORD DRAWINGS DO NOT IMPLY OR WARRANT THAT THE FACILITIES SHOWN ARE “AS-BUILT”. FUTURE WORK INVOLVING THESE FACILITIES SHOULD BE SUPPORTED BY ACTUAL FIELD LOCATIONS AND MEASUREMENTS.KATHRYNS U ZANNE FOR E STERSTATEO F WASHIN G T ONLI CEN S ED LANDSCA P E A RCHITECTN O . 1 4 4 8 E X P . 12/12/23KATHRYNS U ZANNE FOR E STERSTATEO F WASHIN G T ONLI CEN S ED LANDSCA P E A RCHITECTAS-BUILT D-397610