Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
D-397614
BACKFILLED AMENDED SOIL FOLLOWING INSTALLATION OF PLANTS, PLACE MULCH LAYER AROUND BASE OF PLANT. MULCH SHALL BE 3" THICK. ENSURE MULCH IS KEPT AWAY FROM PLANT TRUNKS AND STEMS TO PREVENT ROTTING 9 BUILD A SMALL SOIL BERM RING AT PLANT DRIP LINE TO INCREASE WATER RETENTION 8 WHILE BACKFILLING, FIRM SOIL AROUND PLANT GENTLY WITH HANDS TO ELIMINATE AIR POCKETS. DO NOT INJURE ROOT SYSTEM WHILE BACKFILLING AND COMPACTING. ALL ROOTS SHALL BE BURIED BELOW THE SOIL SURFACE 7 ROOT-SHOOT INTERFACE SHALL BE AT SOIL SURFACE. DO NOT BURY TREE COLLAR WHERE TRUNK FLARE OCCURS IN ORDER TO AVOID ROTTING DUE TO BURIAL 6 PLACE PLANT ROOTS INTO PLANTING HOLE ON TOP OF SOIL MOUND AND GENTLY SPREAD ROOTS OUT EVENLY WITH FINGERS, CAREFUL NOT TO CAUSE HARM OR DAMAGE TO ROOTS. NO BUNCHING, J-ROOTING, OR TANGLING OF ROOTS SHALL OCCUR 5 BUILD A SMALL SOIL MOUND IN CENTER OF PLANTING HOLE TO PROVIDE A STABLE BASE FOR PLANTING THE TREE OR SHRUB. COMPACT SOIL MOUND TO REDUCE SOIL SETTLING EFFECTS 4 ROUGHEN SIDES OF PLANTING HOLE WITH SHOVEL OR SPADE 3 REMOVE ROOTS, ROCKS, AND WOODY DEBRIS LARGER THAN 2 INCHES FROM PLANTING HOLE. REMOVE ALL WEEDS AND DEBRIS FROM PLANTING AREA 2 EXCAVATE PLANTING HOLE 2x THE ROOT WIDTH AND 1.5x ROOT DEPTH WITH ENOUGH ROOM TO ALLOW ROOTS TO BE SPREAD DOWNWARDS AND LATERALLY THROUGHOUT THE SOIL PROFILE. EDGES OF THE PLANTING HOLE SHALL BE CUT PERPENDICULARLY TO THE SOIL SURFACE 1 SCALE: DETAIL - CONTAINER TREE AND SHRUB PLANTING 2 -NTS FINISHED GROUND PLANT AT SAME LEVEL AS GROWN IN CONTAINER PLANTING HOLE/ EXCAVATION 2X GREATER THAN ROOTBALL OR CONTAINER WIDTH 24" DIA SHRUB OR 36" DIA TREE BARK CHIP MULCH RING, 3" THICK LAYER, KEEP AWAY FROM TRUNK OF PLANT EXCAVATE SOIL FOR PLANTING TO DIMENSIONS SHOWN. FIRM SOIL AROUND ROOTBALL AND WATER TO SETTLE. DO NOT LEAVE AIR POCKETS. DO NOT DAMAGE ROOTS DURING PLANTING OPERATIONS REMOVE CONTAINER PRIOR TO PLANTING. DURING PLANTING OPERATIONS GENTLY LOOSEN AND SPREAD ROOTS AT BOTTOM OF ROOTBALL SCALE: DETAIL - LIVE STAKE PLANTING 3 -NTS 1. STAKES MUST BE 1/2" TO 1" DIAMETER AT BASE OF STAKE. 2. STAKES WILL HAVE MINIMAL WARPING OR BENDS, BEING MOSTLY STRAIGHT IN FORM, FOR EASE OF PLANTING. LIVE STAKE PLANTING NOTES:PLANT LIVE STAKE WITH MIN 2 LATERAL BUDS ABOVE GRADE MINIMUM 2/3 OF LENGTH BELOW GROUND PRE-DIG HOLE BEFORE INSERTING LIVE STAKE, TAMP SOIL TO REMOVE AIR POCKETS BASE DIAMETER SCALE: DETAIL - BARE ROOT TREE OR SHRUB PLANTING 1 -NTS PLANTING SCHEDULE AND DETAILS L1.10 14O:\proj\Y2018\18-06779-000\CAD\Dwg\record\Details-rcd.dwg | 12/5/2022 9:59 AM | Eric MarshallAT FULL SIZE, IF NOT ONEINCH SCALE ACCORDINGLYDRAWN: CHECKED: APPROVED: DATE: PROJECT NO:ONE INCH© 2022 Herrera Environmental Consultants, Inc. All rights reserved.DESIGNED: DESIGNED: DESIGNED: SCALE: DRAWN: DRAWING NO: SHEET NO: OFNo.REVISION BY APP'D DATE CALL 811 BEFORE YOU DIG RECORD DRAWINGS NOVEMBER 2022 18-06779-001 MADSEN CREEK FLOOD RISK REDUCTION PROJECT 15 J. WAGGONER R. GLEASON C. WEST AS NOTED E. MARSHALL R. GLEASON M. EWBANK M. EWBANK ROOT STOCK KEY: BRS: BARE ROOT STOCK GALLON: CONTAINER PLANTING LS: LIVE STAKE MADSEN CREEK 100% PLANT SCHEDULE R. GLEASON J. WAGGONER K. FORESTER J. WAGGONER K. FORESTER RECORD DRAWINGS: THE REVISIONS TO THESE CONTRACT DOCUMENTS REFLECT CHANGES IN THE WORK MADE DURING CONSTRUCTION BASED ON CHANGE ORDERS AND DATA FURNISHED BY THE CONTRACTOR. THESE RECORD DRAWINGS DO NOT IMPLY OR WARRANT THAT THE FACILITIES SHOWN ARE “AS-BUILT”. FUTURE WORK INVOLVING THESE FACILITIES SHOULD BE SUPPORTED BY ACTUAL FIELD LOCATIONS AND MEASUREMENTS.KATHRYNS U ZANNE FOR E STERSTATEO F WASHIN G T ONLI CEN S ED LANDSCA P E A RCHITECTN O . 1 4 4 8 E X P . 12/12/23KATHRYNS U ZANNE FOR E STERSTATEO F WASHIN G T ONLI CEN S ED LANDSCA P E A RCHITECTAS-BUILT D-397614