Loading...
HomeMy WebLinkAboutSWP2701269.335 30 25 20 EX/sT 42"01`rCP MH#1 NOTE: DO NOT , FC, 'Z E If 0/''/ 1 '. 0TD /�Z,4N R OAK � sc� �Z a3 Puget Sound Power & Light Substation /l -Ex45 ,yAe stanch MH#6B-) r 4 H � c TG`,D CONAIZCT/dAI M� 3 P 42='K 0" 6W CSM I�{111111 rnir LEGEND _ /2" Cs� CUZI/ _ ex TEi!/l7'/ON CSMP CD/S�RG'G4 TE0 STEEZ /"I IW /"/,�f J�f /�/i /Z f '/S" jd +� IN.Sp' 'MR46CD1 : / yA _ =_ / Q I O l�_ UNDEi4G/?DUND V4UZ7 5 1 = DC � I f/ F/fff YD�.4NT A017 / -CT/ON DT I Z OIYJ PLAN } 01+00 1 +00 2+00 4+00 5+00 6+00 7+00 8+00 9+00 p �i�— - - PI�Of'E/4 T Y Z //VE .9NO /'70NUMfit/TJ, Q h 00 (EX/S7) EX.4M/r'L E,S OF J'CCT/ON &I-IM45E/F/A16 � � � D�i9ECTioN of caT� YSTE E 3, ECWN NUMBER SECT/OiV NUMBER 3�.50' � 5 .SECT/ON s h JHEET ON Wf//C11 SECT/ON Z .SAWT ON W111eH j ARPE,IRS SECT/ON T/TLE S�CTiO�/ /S T4/fEN N P i PIPE CLASS & BEDDING SCHEDULE Pl) i(n_/ St at-io n Pipe Typo, and C 1as� 48'' 0+00 to -0+19 � � RCI I I �72" 0+00 to 2+20 RCP II C 21) q n 72" 2+20 to 2+92 RCP _III (' 72" 2+92 to 5+80 RCP III 13 M K#Ov- r 72'' 5+80 to 6+20 RCP III C " 72" 6+20 to MH 4A RCP I I C. v►+ I I 42" bIII 4 RCP III C X- 42'' 1NII1 4 CSMP/0.064" 1 `r 12" MII I RCP III C ' C0 x42" 1II1 6 'S`IP/.109'. I Mil 6 RCP III C 15'' IIIII G RCP IV C w 12" NIII G CSMP/0.064" - F 12" CB-1 RCP III C moo" MH li4 TD MH!o l�C1° ISL 101LE I CAPS MH#I MH#2 /UDTf Z 0C,4T/ON O/" IWIVIIOLf W / /J' ,4PPlPDX/M,4TE. CO/VTi`UCT0/`F J1114Z Z f/EL D Z OC,47Z ZXV7 -V " AC/0 11WIM 70 OT/ZEiy CONf7iTZIC7AN) 3o 31 .7L 3+00 10+0 0 C"Z-ZON y/Gf/ V29ZT,4GE Z/NES CI'MYS P/pe ,4Z /GN- 1 1 +00 MH#3 MH#4A MH#5 IVfiVT Sf� .r11Sf17-2 ►�-,YC,4!141f TO Jff /"2,4N fOr9 � rr� x �XC,41�,41/D�t/ L/141117' cb � ►� ,� IV 7--111111 0,3 qj Q411"AIOWAI elf V,4T/Oi!/.1' , Ground 3 h /N.ST,4Z Z /2 CS/A'//n Fir» Sii _ W T �" \ Gr'e 2 -'1. ml�l over Oil. pe _ ✓ � � _____ Flr�. 6ro% .!.III. I / 42 ",0' /„ /1y �B I—---- _ - r I r 15 �-//vy /7 SO ,S = 6. 7 % + //IZV. = 16,71 �,4f'f'fYOX EZEV - CONW-C7oIr ro F/El D DETER1v1A1e) �► SVNp ...t �-/t UC� I/ s = O.22 2 �2 flJ/A�,BOTTO/'� sUM� dOlTOM 2D. 09 /�1v = 20. ZO /1Vr/ = /&. a -- � /1,41V//0Z Z'J' 4,4 4W /"/L f JU/"�O/3TE0 4 - — PROFILE SCALE: Horizontal: 1'' 50' Vertical: 1"=5' 12400 13+00 35 1 Debri s L3Arri see 30 J EX/,ST 60 "x 4225 csr/� —//VI/ = 22. 5 20 CJW,10 EXrZ"it/s/O/V 15 ! 1. Inside pipe diameters sh(� 2. See Sheet 2 for datum and horizontal control. 'i. See schedule this sheet for pipe classes and bedding requirements. 4. Minimum pipe cover from Station 9+50 to Station 12+18 shall extend horizontally 2 feet each side of pipe wall before sloping to existing grade. 5. 12-inch CSi11P culvert over 60-inch drain shall be installed at minimum grade over 60-inch pipe and at a slope of 0.5 percent. Length as requ i i"(Id . TALBOT ROAD SQ. i v Q /N 0 I �-Fii�l. Grvds 29. Z LLB imi T��� N m �n C C_ W V � Q Z J �1 Q C W co 0 CL Q O��W J U OC J O Zy. 4) I— 00 E- cc za W �CO O CL Z UJ C O �° W Q +� Vo � Cr CC W Z p ca Q � DESIGNED Z. CiY/rl/'1 DRAWN. ,Bffj CHECKED: W. REVISED z�L 8/23182 Pr-R APr)E:NDUM No 14 CITY OF RErlTori 1,45M AsBLj'/� 2 E33 C9.3400/. 3 SHEET �1 � 4