Loading...
HomeMy WebLinkAboutTED4001331.1iENIP, sILTA-j'ION ZONE (SEE DETAIL) 3c: w ' Q IOa TEMPORARY EROSION CONTROL NOTES �_~ M �• LIMIT CLI�I 'roviae and maintain temporary sediment control facilities to insure sediment- ILCIkAC)InI aden water does not enter the natural drainageway system. The temporary 1 �T p/L erosion/sedimentation control facilities shown on this plan shall be constructed �6•.7"Cc E, -,�,� �- _ ,rior to any grading or extensive land clearing in accordance with the approved rf'/i"'-----i.h 1 ��7$0 / --�- _yTa - -'emporary erosion/siltation control plan. These- facilities must be satisfac- i 1 1 f ._ —__- _ orily maintained until construction and landscaping is completed and the �- - -- "`T-`--tj...._.�_ < < •. potential for onsite erosion is sussed. ' ---_ # _ ♦ ! em orar sediment. control facilities shall be constructed in accordance with P, S CLEAR D AREA `(EE DETAIL �' y � he details shown Temporary sediment control facility locations may be moved 37rN S?' -o suit field conditions subject to approval by the engineer and the / 4 �-- ,11 ponds and ditches and other erosion -sedimentation facilities shall be r 12 iaintained in good working condition throughout construction. AlfMReturn siltation control areas to original ground conaition or better. approval of this plan is solely for the temporary erosion/siltation control )lan and is not approval of design, location or seize of pipes, restrictors, -hannels or detention facilities. FVN1�INC-1 -ZC_? - r / ' -- _ - C► TOTAL CLEARED ,w r MINA, VOL., -75C U. FT, i AREA � 1 / i' � i► ! J .. �• 1 :.� ��, i @ 40 CU. FT.% 2F_ ` AREA 5,Z AC.14 lip 64 �- t -TFWF, SILTATION, �NEdo 40 M I N, �tJ IFFE f� TIO -'O P "' N' 17 IT OR \ TE.MP. SILTATION! ZCiNE � ' TEMP DITCH (SEE DET,AIL)�., \ - 20' X 2& X I ' O E E" P 1°'S,\ r o� + • �\ \ 4 , MI i�l, VOL. , 400 CU FT I - 2o0X2 ' NI I N , VD L , 4o0 Cu, FT, -v \ A T`(P AT VAS.TIMIES QJ� ~ `'` ``\.\ \\!• - VAR- ✓;OCK / 20' MIN 2V MAX, ` �LUVy DIRECT -ION - i EX. EXCAVATE PON D � NL� ZONE � It KEY RcX K B E Lv W 1 PCON P4 N 61 ZON E T E Zvi P':S I L T AT I O N ZONE DETAIL._ NUT E GLON i (zAC70f;c' S{-IAL _ I KGFE-GTPONDS ;=QEQUGNT'L'-e At -JP AF-rEI (-IEAV Y RAIKIS F0kZ NEEPEP f`/IAINTENANCE. IL z - L_ PRovloe I `THICtC �c1.4,vin�� dKaN&fiG*(,s 1uIT+4 5cvA6S ?49% I TEiv F DITCH �� E T ,4 I L N �"S FA J- GENERAL NOTES - STORM & SANITARY SEWER 1. CONTRACTOR All work and materials are to be in accordance with the standards and specifications of the City of Renton Utility Department and the latest edition of the APWA "Standard Specifications for Municipal Public Works Construction". Determine exact locations of all existing utilities and structures, that might be affected by this construction, to avoid damage or disturbance. Verify all elevations and dimensions that will affect this work. Obtain all necessary permits prior to construction. RECOMMENDED r-OR AP PROVAk 7 -u-ZP3 Ap �o ved �AiG R-I33IOI L_ M. M I 7-G- 8 -5L p6 . D PT_ iZE (V J . ►,(. REV DATE DESCRIPTION BY VALLEY GENERAL NORTH PROFESSIONAL F3L(?6:4 . T EIVIF-0OrZA1<Y EROSION/SILTATION CCUN T I�C_�L PLAN I NT0IN H . K. M. MAW ASSOCIATES CONSULTING ENGINEERS CENTRAL BUILDING SEATTLE, WASHINGTON 98104 i2081 824-7148 SCALE I" -ATj' PROJ. NO \� 539 O R N K E N P,4 L L DATE "�y,F`SQI AL JG\ C 1-4 4C DATE DRAW. N O APP'D JDATE 41op lopz:�r7