HomeMy WebLinkAboutSWP2701372.1f
o0
NU)
M T
Ory
.0 b
1,4)
ZW
13 2y
SCALE /N FEET
100 0 .00 zoo 300
SEC.2y •723N•R4E
20
ON
N
0
0
14Nin
+�M
Oyu'
Ors _
NN--
.........
UZW
CURVE DATA
Mma0)i
�,n`0
a
=77" a9, yy--
t Om
co
...............
D =3rd°
OL6uiI�n
± �u,
iri
R=159.15'
i"zw
T = 12 7. 73 '
Fr-zw
L=215.27'
\
�•
s
........... .............
......... ......
WATERWAY TO BE LEFT OPEN
> CULVERT TO BE INSTALLED
G�`ON �,IMIT
P OR PRE GONgT RV
3ZO' PACIFIC AST
IY
P= ANENT
140
-CHANNEL BOTTOM ,
/ N11°3N�q(;W
0oo 0
P��MEN'C
150'
PERMANENT E
TEMPORARY CONSTRUCTION LIMIT 6'40"
320' ��E -320
SPOILS PERMANENT EASEMENT 280=
140' 140'
CROSS -5ECTION/TYPICAL STATIONS 3
fo90+71 00 TO 699+00
MIN. ELEV. 114.0'7 150
CHANNEL BOTTOM
W
20" WASHINGTON NATURAL GAS CO. PIPELI
( TO REMAIN UNDI5TURSED)
0
x
-
OLD G�RNEt, x
FIL'L
ROAD -COMPANY
CNAtQNE1-
L-690 + 7100
140' END TRANS/T/ON_--_
x
:r M
M OQ'.
,rW
ID 7
�Tm
+ .o M
^� ao �
ZW
�y
..... \ W.M. \ \
x W �7 \
x _z
0 Y
x a
x—Z �
>� I LL 3
sJ r� I Ld
320' 0
0 .......
—�
'CRUG-C10N LIMN ❑
TEMPORARY COK6
I
APPARENT PROPERTY LINE
�— x
z x x
MUNICIPALITY OF METWO:'OLITAN SEATTLE
15' BERM
SPOILS
10' MAXIMUM
NOTES
I. The temporary construction permit shall be obtained for a period of 36
months from beginning of construction and shall terminate at end of this
period or upon completion of the construction work, whichever occurs first.
2. All fences, buildings, trees, and bridges within the permanent
easement and temporary construction permit limits shall be removed
and disposed of unless noted otherwise.
SiLE SLOPES NO 5TEEPER THAN 2.1
3. Temporary construction permit areas shalt be for use by the GREEN
RIVER FLOOD CONTROL ZONE D/STR/CT for operation and storage
of construction equipment and material including spoils removed from
channel excavation. Spoils not removed from temporary construction
permit areas shall become the property of the landowner upon
expiration of the pirmits.
4. All co-ordinates are based on the Washington State co-ordinate system.
5. All R/W areas listed in tabulations have been obtained by planimetering or
stating from land rights work maps.
NI
O u7
R/W REQUIREMENTS (in acres)
OWNER
PERMANENT
TEMPORARY
EASEMENT
CONST.PERMIT
PACIFIC COAST
RAILROAD COMPANY
%. 1
7.9
WASH. NATURAL GAS CO.
2
(EASEMENT ONLY)
MUNICIPALITY OF
"ff TM 1AAI -•1 CCA-r r L•
I.O
+ :zI
�
O
QI
00
� E
0
0
U
r
z E 1,653y500
106"�vMED
'CROFIE.-
REVISED NOTE i9 G°
REDESIGN OF CHANNEL /1168
MINOR CORRECTIONS
SYMBOL DESCRIPTION DATE APPROVED
REVISIONS
EXCAVATION DATA
FROM TO CUBIC YARDS
STA.688*00 STA.1o99+DO 92,852
20 -
LAND RIGHTS WORK MAP
P•1 CHANNEL
EAST GREEN RIVER WATERSHED PROJECT
10
GREEN RIVER FLOOD CONTROL ZONE DISTRICT, KING COUNTY, WASHINGTON
U. S. DEPARTMENT OF AGRICULTURE
SOIL CONSERVATION SERVICE
O - Date
--(-� Approved
Designed%/.L.H._—AE'8------------- �(c7
Title - STATE_ CONS ERVAT/O/V
Drawn-dG-w -------- -- - - -11/67--- - - — --- - -
Fitle_KING_COUNTY E_NOMEER __---_-
Traced�N�-- _1.1, 68, Sheet DTi F
a F,G - L R - 01.02
No Z
{
4q w