Loading...
HomeMy WebLinkAboutSWP2701372.1f o0 NU) M T Ory .0 b 1,4) ZW 13 2y SCALE /N FEET 100 0 .00 zoo 300 SEC.2y •723N•R4E 20 ON N 0 0 14Nin +�M Oyu' Ors _ NN-- ......... UZW CURVE DATA Mma0)i �,n`0 a =77" a9, yy-- t Om co ............... D =3rd° OL6uiI�n ± �u, iri R=159.15' i"zw T = 12 7. 73 ' Fr-zw L=215.27' \ �• s ........... ............. ......... ...... WATERWAY TO BE LEFT OPEN > CULVERT TO BE INSTALLED G�`ON �,IMIT P OR PRE GONgT RV 3ZO' PACIFIC AST IY P= ANENT 140 -CHANNEL BOTTOM , / N11°3N�q(;W 0oo 0 P��MEN'C 150' PERMANENT E TEMPORARY CONSTRUCTION LIMIT 6'40" 320' ��E -320 SPOILS PERMANENT EASEMENT 280= 140' 140' CROSS -5ECTION/TYPICAL STATIONS 3 fo90+71 00 TO 699+00 MIN. ELEV. 114.0'7 150 CHANNEL BOTTOM W 20" WASHINGTON NATURAL GAS CO. PIPELI ( TO REMAIN UNDI5TURSED) 0 x - OLD G�RNEt, x FIL'L ROAD -COMPANY CNAtQNE1- L-690 + 7100 140' END TRANS/T/ON_--_ x :r M M OQ'. ,rW ID 7 �Tm + .o M ^� ao � ZW �y ..... \ W.M. \ \ x W �7 \ x _z 0 Y x a x—Z � >� I LL 3 sJ r� I Ld 320' 0 0 ....... —� 'CRUG-C10N LIMN ❑ TEMPORARY COK6 I APPARENT PROPERTY LINE �— x z x x MUNICIPALITY OF METWO:'OLITAN SEATTLE 15' BERM SPOILS 10' MAXIMUM NOTES I. The temporary construction permit shall be obtained for a period of 36 months from beginning of construction and shall terminate at end of this period or upon completion of the construction work, whichever occurs first. 2. All fences, buildings, trees, and bridges within the permanent easement and temporary construction permit limits shall be removed and disposed of unless noted otherwise. SiLE SLOPES NO 5TEEPER THAN 2.1 3. Temporary construction permit areas shalt be for use by the GREEN RIVER FLOOD CONTROL ZONE D/STR/CT for operation and storage of construction equipment and material including spoils removed from channel excavation. Spoils not removed from temporary construction permit areas shall become the property of the landowner upon expiration of the pirmits. 4. All co-ordinates are based on the Washington State co-ordinate system. 5. All R/W areas listed in tabulations have been obtained by planimetering or stating from land rights work maps. NI O u7 R/W REQUIREMENTS (in acres) OWNER PERMANENT TEMPORARY EASEMENT CONST.PERMIT PACIFIC COAST RAILROAD COMPANY %. 1 7.9 WASH. NATURAL GAS CO. 2 (EASEMENT ONLY) MUNICIPALITY OF "ff TM 1AAI -•1 CCA-r r L• I.O + :zI � O QI 00 � E 0 0 U r z E 1,653y500 106"�vMED 'CROFIE.- REVISED NOTE i9 G° REDESIGN OF CHANNEL /1168 MINOR CORRECTIONS SYMBOL DESCRIPTION DATE APPROVED REVISIONS EXCAVATION DATA FROM TO CUBIC YARDS STA.688*00 STA.1o99+DO 92,852 20 - LAND RIGHTS WORK MAP P•1 CHANNEL EAST GREEN RIVER WATERSHED PROJECT 10 GREEN RIVER FLOOD CONTROL ZONE DISTRICT, KING COUNTY, WASHINGTON U. S. DEPARTMENT OF AGRICULTURE SOIL CONSERVATION SERVICE O - Date --(-� Approved Designed%/.L.H._—AE'8------------- �(c7 Title - STATE_ CONS ERVAT/O/V Drawn-dG-w -------- -- - - -11/67--- - - — --- - - Fitle_KING_COUNTY E_NOMEER __---_- Traced�N�-- _1.1, 68, Sheet DTi F a F,G - L R - 01.02 No Z { 4q w