HomeMy WebLinkAboutSWP2701372.11I. The temporary construction permit shall be obtained for a period of 36
months from beginning of construction and shall terminate at end of this
period or upon completion of the construction work, whichever occurs first.
2. All fences, buildings, trees, and bridges within the permanent
easement and temporary construction permit limits shall be removed
and disposed of unless noted otherwise.
3. Temporary construction permit areas shall be for use by the GREEN
RIVER FLOOD CONTROL ZONE DISTRICT for operation and storage
of construction equipment and material including spoils removed from
channel excavation. Spoils not removed from temporary construction
permit areas shall become the property of the landowner upon
expiration of the permits.
4. All co- ordinates are based on the Washington State co-ordinate system.
5. All R/W areas listed in tabulations have been obtained by plonimetering or
scaling from land rights work maps.
I
i
TEMPORARY CONS`TRUCTION LIMIT
520'
N.P. R.R R/—
W
pERMANE..N7 EASEMENT
2 00' 132"13 2 "
' 1 L-
3 320'
ANNEL �-I 15' BERM
TTOM
E Ir1D a`--�
- 10" MAX. NOT STEEPER
THAN 2' 1 S. S-
SPOi-S TYPICAL X-SECTION 595 +00 TO 616,00
MATCH LINE SHEET 10
zo
rel
0
0
of
�w
w
w=
Z :n
Os
O
O
O
O�w
+F
—
_. O
t0
�z4
+O
1_0O
D
+
O
�0
1nZa
0