HomeMy WebLinkAboutSWP2701372.128
%CAL= ; PEET
uC !w
W
z
J 'V)
zw
QN
0 -
P.I. 592+ 78.38
to N 166, 44 1 33
LI) E 1, 652, 382. 46
In
CURVE DATA
D= O1° I
R= 5,729.58' O
T= 470.18'
L= 818,97'
26
�_ F_
L771Q
WO
Z _,,
ZW
00
J
>cJ�
W 6 `W
W
0
k.P.R.R. R/W
VARIES
50' TO 200'
L AC IER PARPe ""OrAPA NY
TE.MPOt2ARY CONSTRUCTION LIMIT
135
—PERMANENT EASEMENT
s CHANNEL �-�-15' BERM
BOTTOM
120"
MPORq'S'Y
covs rKu C r/oN
10' MAX.
1 5POI LS
TYPICAL X-SECTION
574+00 TO 595+00
NOT STEEPER
TRAM 2:I S.5
LOl
QO�D
i I
Z - --
`'f 2" WATER MAIN � \
\ \ > x ORILLIA WATER LINE
<< tit, ;*f'`J`; \
�r 574+00
1
x
LAIz GEORGE JONIENTZ
4 I ,
CARL C. STERNOFF
..J \
E DATA x
EX ISTING GROUND
NOTES
I. The temporary construction permit shall be obtained for a period of 36
months from beginning of construction and shall terminate at end of this
period or upon completion of the construction work, whichever occurs first.
2. All fences, buildings, trees, and bridges within the permanent
easement and temporary construction permit limits shall be removed
and disposed of unless noted otherwise.
3. Temporary construction permit areas shall be for use by the GREEN
RIVER FLOOD CONTROL ZONE DISTRICT for operation and storage
of construction equipment and material including spoils removed from
channel excavation. Spoils not removed from temporary construction
permit areas shall become the property of the landowner upon
expiration of the permits.
4. All co- ordinates are based on the Washington State co-ordinate system.
5. All R/W areas listed in tabulations have been obtained by plonimetering or
scaling from land rights work maps.
- 574 +00
MATCH LINE SHEET 11
MINIMUM T
P OF BANK
EL.\ye--.
1q7
_...._..........._
_..�._.._..�_.
...._............
.._...�......_...........__..._...
._....._....._...
........
..._......____.
......._.._......
........._..._.....
...._........
............................_...
......._..........
..._......._....
....._.........
................
.._......_....__
CHANNEL
BOTTOM
5=0.0004
EL.3.9
595+00/MATCH LINE
I
TO PROFILE SHEET 9 0 0 0 0
O 0) 1u1 0
ZW
I ADDITIONAL TOPOGRAPHIC DETAILS
I
CURVE ADDED
6/%9
SYMBOL DESCRIPTION DATE APPROVED
REVISIONS
R / W REQUIREMENTS (in acres)
OWNER PERMANENT TEMPORARY
EASEMENT iCONST. PERMIT
GLACIER PARK COMPANY _ 12.9 �� II.5-
CA RL C. 5TERNOFF - — w 4.8
GEORGE J01V1EJVTz m Y ____ 1.9
EXCAVATION DATA _
FROM TO CUBIC YARDS
574 + 00 595+00 175,000
LAND RIGHTS WORK MAP
P • 1 CHANNEL
EAST SIDE GREEN RIVER WATERSHED PROJEG
GREEN RIVER FLOOD CONTROL ZONE DISTRICT, KING COUNTY, WASHINGTON
U. iiEP-ARTMENT OF AGRICULTURE
SOIL CONSERVATION SERVICE
Date
Approved b�
Designed ----TT N=W=------------- -I I _68
Title_ JTA7 --_-ONS_----INEEA'
Drawn----G G=---------- ---- -1- 69 ------------------------------------
Title--------------------------
Traced --_------_--- ------------ ------- Sheet Drawing No,,,, -.
e Na 10 E& LR- OLO
Checked-W'-C------- fi- '-- —-------- :
of 11
a
4--3 Z
MICROFILMED