Loading...
HomeMy WebLinkAboutSWP2701372.19le L SCRLE M FEET to 0 IOC LO^ _', 00 `)EC 31 T 23N PSE 3 ° 0 0. oco 0 f= — �U � 00 00Oro 0r toil 1 A a�9t,0 ")'p MzcLl GFNE 60N ON 1 6Sr Fq �9\�490 \ ea \ R► "dk 6 y HUMBLE OIl. f� NATIONAL NOT STEEPER THAN 2:l s.S.. 1 on SPOILS 10' MAX �1 � Co 0 r6 +7LO QQ'9� dl-- t7ZW I 0 • 00 0 COMPANY Q� SANK OF COMMERCE P APOLO D C. PE "_ P Z F- �- G Of Y So. 180tb St. 60' R/W Co 10 9zut 66zr 10 0 to 0)_ nzw — Will i.5 R/W CURVE DATA 6 = 53'57'20�.�. D=9° —R = 636.Cb2' T= 324.0E-' L =599. 51' 72 A`- 'q" CULVERT (TO BE EXTENDED) COM MON WLE-AL. i H INVESTORS CAST VA r L \ HIGHWAY 100' Ln 5TOEEPER SPOIL THAN 10' MHX. 2-:1 5.5.- v TEMPORARY R/W TEMPORARY CONS [RUCTION LIMITVARIES Iyj OL, NOT Oet STEEPER 11 54' to- PERMANENT EASEMENT + 4� THAN Z �9�CHANNEL BOTTO�MF_7�RO /W l— 9 indicates l5' Berm end Exist(nc,, Cie-ounA C J Ll w x 0 rr) 41 '('.z SPOIL5 10' 10' MAX v 0 °' 0 Ln L6 rm 1.6 T r CQ Z Li AR��AR Y S _ o TgTE tit O K__ Q0 1, 657,500 ERMA LENT EASEM 5 �� ENT B°UNC) pE�MANE NTk� ASEMENi g0UNbHR� TEMpORA�y `0IV5TF2iJCT i0N LIMIT J F COULON TEMPORARY CONSTRUCTION LIMIT PERMANENT EASEMENT PRIMARY STATE HIGHWAY`5 R/'W 4'CHANNF-L BOTTOM TEMPORARRY CONSTRUCTION LIMIT PERMANENT EASEMENT PFRIIMARY STATE HIGHWAY "I R/W W CHANNEL BOTTOM 5- R/W REQUIREMENTS `n acres) OWNER PERMANENT EASEMENT TEMPORARY CONST. PERMIT 31?0A1)AC,PE S /NC. 0.41 0. 5 -1 NATIONAL 8ANKofC0MMEPCE 0.09 0.07 C01V7N0NWEALTN INVESTORS 0,53 0.72 GEiVE 30/V0A'i` 0.45 J. F COUL041 0.55 0.54 R/CENARD 3A 27 0.27 0.32 HwY x 0 DATE APPROVED SYMBOL DESCRIPTION REVISIONS NOTES I. The permanent R/W shown shall be obtained by permanent easement or deed fee simple running to the GREEN RIVER FLOOD CONTROL ZONE DISTRICT in a form satisfactory to the SOIL CONSERVATION SERVICE. Permits issued by the COUNTY or STATE HIGHWAY DEPARTMENT covering roads and highways, when approved as to content by the SERVICE, are acceptable. All documents covering permanent R/W shall be recorded. 2 The temporary R/W indicated can be obtained by permit or temporary easement in a form satisfactory to the SERVICE. This R/W shall be obtained for a period starting at the beginning of construction and shall terminate upon completion of construction. Temporary R/W will be used by the DISTRICT for operation and storage of equipment and material including spoils removed from channel excavation. Spoils not removed from temporary construction R/W shall become the property of the LANDOWNER unless agreed otherwise. 3. All fences, builaings, trees, signs, and bridges within the permanent and temporary R/W which the SPONSORS or OWNERS wish to salvage or relocate shall be relocated or removed, unless noted otherwise, prior to start of construction. If salvage is neither required nor desired, items will be removed and disposed of during construction. 4. All co-ordinotes are based on the Washington State co-ordinate system. 5. All R/W areas listed in tabulations have been obtained by scaling or plonimetering from Land Rights Work Maps. Permit needed, for the Crossing of 5o.I80th St, and the East valley Htgh- way, from the Ctty(ies) of Renton and/or Kent. 9 Right of ingress and egress to permanent easement and temporary con- struction permit area at locations Shown. O + S True East-West dimen_inn Permit required for FreevVay CULvert outsets. EXISTING GRO ND@ LAND RIGHTS WORK MAP 1"LEV1"89 P- 9 CHANNEL EAST SIDE GREEN RIVER WATERSHED PROJECT GREEN RIVER FLOOD CONTROL ZONE DISTRICT, KING COUNTY, WASH. U. S. DEPARTMENT OF AGRICULTURE -- -- - - -- SOIL CONSERVATION SERVICE Date ✓ �� �dt Designed--T - w=' ___ � cY 4--`----------- -- ---- Approved I " Title_ STATE-C-- ---- ATIO_- CAIGII O + to o 0 o Drawn-----V , �G---- ( _ 69 -------------- ------- ----------------------------------- m N� ao 7 Title-------------------------------- Sheet Drawing No. Traced_-_-_T_- `T--_-__----_---___- __- Checked : 3 ?C 6 I q %� EG �L. R-0 -0 - :; - — Co 4 •3Zia 1