HomeMy WebLinkAboutSWP2701372.2R/W REQUIREMENTS (in acres)
scA�cn+►ccT TEMPORARY PERMANENT TEMPORARY PERMANENT
OWNER CONST. PERMIT EASEMENT OWNER CONST. PERMIT EASEMENT
so c so 100 'ao METRO INDUSTRIAL DISTRICT , 5 . 2 CITY OP PENTON .2
SEC.24 • T23N • R4E
REVISIONS
SYMBOL
DESCRIPTION
DATE
APPROVED
M/A/OPr CORRECT/OIVS
5,i 68
CI�C.
REDS S/G 1V OF CHANNEL
REVISED NOTE
4
R/W W/DT14ADJUSTED
N.P.R.R. R/W
5
PUGET SOUND
POWER AND LIGHT
.5
2
F. H. DICKSON
MOB INVESTMENTS
,25
,/
R.J. SALCOM
_y
.2
NORTHERN PACIFIC RAILROAD CO.
.8
.3
J. A. ISAACSON
.3
..c-,/
PACIFIC COAST RAILROAD COMPANY
.8
.2
S. ISAACSON
.7
.05
WASHINGTON STATE HIGHWAY
.7
1.1
CHRIS PALZER
. 06
MUNICIPALITY OF METROPOLITAN
SEATTLE PIPELINE EASEMENT
' z
'2
WASHINGTON NATURAL GAS
CO. PIPELINE EASEMENT
' 03
EXCAVATION
DATA
FROM
STA. 688+001
I TO
CUBIC YARDS
L42,159
PUGET
1 SOUND
POWER 4
� LIGHT CO.
L 320
° ar
EP
.
N Z .0
WASHINGTON NATURAL GAS PIPET. 5- (�-
10' EASEMENT 70,
.L PT ro 87+71.00
N 174 209.06 7U�
E I, 653, 721 .53
( BEGIN TRANSITION)
Z
320' L
L1J
It
0
R/W-
'50
-0-P.P.
x
Q
0
J
METRO PIPELINE
- - -- - -REMt N N - -
-__ � Ai #t DI T S t1R EG
A
O
0
O
t`
Z E1,654,250
WASHINGTON STATE \'
HIGHWAY R/W
F.H. DICKSON
'' CU
LVERT
ULVERT
1x
N.P.R.R. 1
TRESTLE
(TO REMAIN
UNDISTURBE )
x
1
l�
I
"I" GAS PIPELINE ": b
12" WATERLINE ' 6
OLYMPIC NATURAL
OGAS CO. PIPELINE
4
MET c O
mCQ�
STI L ca Nc1N
DISTRI + C
r�COD
-9 0 `91- -
0. Z `u1
a
END TRANSITION
APPARENT PROPERT LINE
EXISTI NNE
.-CHR I S
PALZER Z
U U1
Qw
=
CURVE DATA � o • x
L = 330 56, 571' j
D = 20°
T 87.45
L 3 169. 75
I / x PT677+46.89 BUILDING
/ N 173, 311.90 0 1
F.H. DICKSON � E 1,651{,135.78 AURI/47E DATA
4.6 "
D = 15°
R = 381.97
T c 168.92
I 0 L = 318 . os
Ep,SEM-i
o �a, .3eW
N1"' S7t-1.6
APPARENT PROPERT_"
Z
Lt
cn
Q
0-
W
O
0
za
_:3
TEMPORARY CONSTRUCTION LIMIT Q
C3
APPARENT PROPERTY LINE
_
R.J. GALCOM
111� APPARENT PROPERTY LINE
PP.
TEMPORARY CONSTRUCTIION ✓
{ R�
oP-
R�
�ti�^QO 6 SO. 15 3 RD
�8 DUCT TELE. CONDUIT-
�_624- METRO PIPELINE-
B. ISAACSON
EARLINGTON GARDENS ADDITION
PT 675+D7.72
N 173, i. is
J.A. ISAACSON E f,65a. 96z58.83
�r
x x 'c
z ~ K
z
0
111- 225�
Z 70'
W
c SE
LL x
O
x
/x 0 K AVE. 30" R/W
x
F.H. DICKSON 1
.x
Ex13TING � a
CHANNEL (TO BE
FILLED) METRO PIPELINE R
60 HIGHWAY /W
(TO REMAIN
UNDISTURBED) x
PT (o91+9fo 3Q
N 173, 6.48,70 I I PC 680+26.59
E 1,653,848.93 N 173,503.5E
W E 1,653,932.02
T
(X
Lj
a•
a
Ld PP
® -x PP I
0
A I u'' t, x APPARENT PROPERTY LINE
/� r M ro
Q
®x IJ/' LCO ( PI 681+14.04 EI,65a75Q CABINS 1
N 173, S 63. 43 HOUSE
E 1,653, 869-32
INTERSTATE 405
( TO REMAIN UN IST-URBED)
•
APPARENT NOTES APPARENT PROPERTY LINE
PROPERTY 1. The temporory construction permit shall be obtained for a period of 36
LINE
months from beginning of construction and shall terminate at end of this
I period or .upon completion of the construction work, whichever occurs first. � LAND RIGHTS WORK MAP
2. All fences, buildings, trees, and bridges within the permanent P� 1 CHANNEL
LIMIT \ easement and temporary cted otherw permit limits shall be removed EAST GREEN RIVER WATERSHED PROJECT
and disposed of unless noted otherwise
x METRO PIPELINI~ 3. Temporary construction permit areas shall be for use by the GREEN
t 10' R/ W HIGHWAY BRIDGE RIVER FLOOD CONTROL ZONE DISTRICT for operation and storage
PS.P$L.
POW ERLINE
(TO REMAIN
UNDISTURBE
41111M-a'
(TO REMAIN UNDISTURBED) of construction equipment and material including spoils removed from GREEN RIVER FLOOD CONTROL ZONE DISTRICT, KING COUNTY, WASHINGTON
channel excavation. Spoils not removed from temporary construction -- - - - expiration
areas shall become the property of the landowner upon lJ . S. �� , � GRICLI T T,�'
expiration of the permits ,�A � � SERVICE
4. All co-ordinates are based on the Washington State co-ordinote system. OIL CO A ION
OLD R N TO N _ - - - -- ----
``, 5. All R/W areas listed in tabulations have been obtained by planimetering or g L to Approved
TUK-�l� ILA scaling from land rights work mops, Des3 ne-cV•L-N,- A B _ I( �67
J _ _ -__ 7;t;e--STATE-_cnn,re0tvATioro�&AWIM
LL W HIGHWAY 6. All _
pipelines are to be located in positions that do not block channel
i- Drawn__G,L.__ - //_-1o7_}----- -
flow. Pipelines shall pass under the channel bottom or over the I ---
I•- channel at a minimum elevation of + 16.0 M.S.L. T e_r(1NG _ ouNrr ENG/HECK
raced_. G.L.G - -- i - -----------
i
- - - - -
L� Waterway to be left open, culvert to be installed. See SHEET 4 for details of powerline crossing and railroad and INc 3
highway bridge crossings and water ,gas and sewer pipeline crossings. $ r -i E
e_ _ II V L R 01. 0
C�'�, --Key W. I ► 6 � �l