Loading...
HomeMy WebLinkAboutSWP2701372.2R/W REQUIREMENTS (in acres) scA�cn+►ccT TEMPORARY PERMANENT TEMPORARY PERMANENT OWNER CONST. PERMIT EASEMENT OWNER CONST. PERMIT EASEMENT so c so 100 'ao METRO INDUSTRIAL DISTRICT , 5 . 2 CITY OP PENTON .2 SEC.24 • T23N • R4E REVISIONS SYMBOL DESCRIPTION DATE APPROVED M/A/OPr CORRECT/OIVS 5,i 68 CI�C. REDS S/G 1V OF CHANNEL REVISED NOTE 4 R/W W/DT14ADJUSTED N.P.R.R. R/W 5 PUGET SOUND POWER AND LIGHT .5 2 F. H. DICKSON MOB INVESTMENTS ,25 ,/ R.J. SALCOM _y .2 NORTHERN PACIFIC RAILROAD CO. .8 .3 J. A. ISAACSON .3 ..c-,/ PACIFIC COAST RAILROAD COMPANY .8 .2 S. ISAACSON .7 .05 WASHINGTON STATE HIGHWAY .7 1.1 CHRIS PALZER . 06 MUNICIPALITY OF METROPOLITAN SEATTLE PIPELINE EASEMENT ' z '2 WASHINGTON NATURAL GAS CO. PIPELINE EASEMENT ' 03 EXCAVATION DATA FROM STA. 688+001 I TO CUBIC YARDS L42,159 PUGET 1 SOUND POWER 4 � LIGHT CO. L 320 ° ar EP . N Z .0 WASHINGTON NATURAL GAS PIPET. 5- (�- 10' EASEMENT 70, .L PT ro 87+71.00 N 174 209.06 7U� E I, 653, 721 .53 ( BEGIN TRANSITION) Z 320' L L1J It 0 R/W- '50 -0-P.P. x Q 0 J METRO PIPELINE - - -- - -REMt N N - - -__ � Ai #t DI T S t1R EG A O 0 O t` Z E1,654,250 WASHINGTON STATE \' HIGHWAY R/W F.H. DICKSON '' CU LVERT ULVERT 1x N.P.R.R. 1 TRESTLE (TO REMAIN UNDISTURBE ) x 1 l� I "I" GAS PIPELINE ": b 12" WATERLINE ' 6 OLYMPIC NATURAL OGAS CO. PIPELINE 4 MET c O mCQ� STI L ca Nc1N DISTRI + C r�COD -9 0 `91- - 0. Z `u1 a END TRANSITION APPARENT PROPERT LINE EXISTI NNE .-CHR I S PALZER Z U U1 Qw = CURVE DATA � o • x L = 330 56, 571' j D = 20° T 87.45 L 3 169. 75 I / x PT677+46.89 BUILDING / N 173, 311.90 0 1 F.H. DICKSON � E 1,651{,135.78 AURI/47E DATA 4.6 " D = 15° R = 381.97 T c 168.92 I 0 L = 318 . os Ep,SEM-i o �a, .3eW N1"' S7t-1.6 APPARENT PROPERT_" Z Lt cn Q 0- W O 0 za _:3 TEMPORARY CONSTRUCTION LIMIT Q C3 APPARENT PROPERTY LINE _ R.J. GALCOM 111� APPARENT PROPERTY LINE PP. TEMPORARY CONSTRUCTIION ✓ { R� oP- R� �ti�^QO 6 SO. 15 3 RD �8 DUCT TELE. CONDUIT- �_624- METRO PIPELINE- B. ISAACSON EARLINGTON GARDENS ADDITION PT 675+D7.72 N 173, i. is J.A. ISAACSON E f,65a. 96z58.83 �r x x 'c z ~ K z 0 111- 225� Z 70' W c SE LL x O x /x 0 K AVE. 30" R/W x F.H. DICKSON 1 .x Ex13TING � a CHANNEL (TO BE FILLED) METRO PIPELINE R 60 HIGHWAY /W (TO REMAIN UNDISTURBED) x PT (o91+9fo 3Q N 173, 6.48,70 I I PC 680+26.59 E 1,653,848.93 N 173,503.5E W E 1,653,932.02 T (X Lj a• a Ld PP ® -x PP I 0 A I u'' t, x APPARENT PROPERTY LINE /� r M ro Q ®x IJ/' LCO ( PI 681+14.04 EI,65a75Q CABINS 1 N 173, S 63. 43 HOUSE E 1,653, 869-32 INTERSTATE 405 ( TO REMAIN UN IST-URBED) • APPARENT NOTES APPARENT PROPERTY LINE PROPERTY 1. The temporory construction permit shall be obtained for a period of 36 LINE months from beginning of construction and shall terminate at end of this I period or .upon completion of the construction work, whichever occurs first. � LAND RIGHTS WORK MAP 2. All fences, buildings, trees, and bridges within the permanent P� 1 CHANNEL LIMIT \ easement and temporary cted otherw permit limits shall be removed EAST GREEN RIVER WATERSHED PROJECT and disposed of unless noted otherwise x METRO PIPELINI~ 3. Temporary construction permit areas shall be for use by the GREEN t 10' R/ W HIGHWAY BRIDGE RIVER FLOOD CONTROL ZONE DISTRICT for operation and storage PS.P$L. POW ERLINE (TO REMAIN UNDISTURBE 41111M-a' (TO REMAIN UNDISTURBED) of construction equipment and material including spoils removed from GREEN RIVER FLOOD CONTROL ZONE DISTRICT, KING COUNTY, WASHINGTON channel excavation. Spoils not removed from temporary construction -- - - - expiration areas shall become the property of the landowner upon lJ . S. �� , � GRICLI T T,�' expiration of the permits ,�A � � SERVICE 4. All co-ordinates are based on the Washington State co-ordinote system. OIL CO A ION OLD R N TO N _ - - - -- ---- ``, 5. All R/W areas listed in tabulations have been obtained by planimetering or g L to Approved TUK-�l� ILA scaling from land rights work mops, Des3 ne-cV•L-N,- A B _ I( �67 J _ _ -__ 7;t;e--STATE-_cnn,re0tvATioro�&AWIM LL W HIGHWAY 6. All _ pipelines are to be located in positions that do not block channel i- Drawn__G,L.__ - //_-1o7_}----- - flow. Pipelines shall pass under the channel bottom or over the I --- I•- channel at a minimum elevation of + 16.0 M.S.L. T e_r(1NG _ ouNrr ENG/HECK raced_. G.L.G - -- i - ----------- i - - - - - L� Waterway to be left open, culvert to be installed. See SHEET 4 for details of powerline crossing and railroad and INc 3 highway bridge crossings and water ,gas and sewer pipeline crossings. $ r -i E e_ _ II V L R 01. 0 C�'�, --Key W. I ► 6 � �l