Loading...
HomeMy WebLinkAboutTED4001396.13i R � PROJECT TOTAL 3 1 0 r4" w �5'o09 �5-99 STRUCTURE NOTES 162100 15 AD& /G 4 870 402 275 3 �) 60 4-52o 0 1 1 2 1 14 13W 31 GENERAL NOTES 1. METAL PIPE NOT ACCEPTABLE 2. METAL ALTERNATE TREATMENT 2 OR 5 3. METAL ALTERNATE TREATMENT 5- ONLY 4. USE SOLID METAL COVER AS PER WSMD STD. PLAN B-19 5. SEE DRAINAGE DETAILS, SHEET 24 6. SEE ROADWAY SEC TK)NS, SHEET 5 & 6 7. SET TOP OF GRATE 112 INCH BELOW GUTTER a. EXTEND EXISTING PIPE 9. PLUG EXISTING PIPE 10. REMOVE EXISTING RIPE 11. REMOVE EXISTING MANHOLE, CATCH BASIN, OR INLET 12 Pq..ACE !TLET PIPE ill CuW OF CONCRETE INLET N REMARKS CONNEC T TO BRI DGE DRA I N T'p ,ATE ,N L3 SIL SEE CHANNEL CHANGE PROFILE SHEET sw— `� _I TO BRIDGE DR A I N N�°� jI V.0. 13, USE E ljk --LED EPIC SECT"INLET END 14 UW END $fC TK)N OUTLET END 15. USE UNIT "0" AS FV WSIC, STD PLAN B-6 106 WC SPECIAL. PROY► S 4 E M.C1N O■ � D y, 6�mpwpq