HomeMy WebLinkAboutTED4001396.13i
R �
PROJECT TOTAL
3 1 0
r4" w
�5'o09 �5-99
STRUCTURE NOTES
162100 15 AD&
/G
4 870 402 275
3 �) 60 4-52o
0
1 1 2 1 14 13W
31
GENERAL NOTES
1. METAL PIPE NOT ACCEPTABLE
2. METAL ALTERNATE TREATMENT 2 OR 5
3. METAL ALTERNATE TREATMENT 5- ONLY
4. USE SOLID METAL COVER AS PER WSMD STD. PLAN B-19
5. SEE DRAINAGE DETAILS, SHEET 24
6. SEE ROADWAY SEC TK)NS, SHEET 5 & 6
7. SET TOP OF GRATE 112 INCH BELOW GUTTER
a. EXTEND EXISTING PIPE
9. PLUG EXISTING PIPE
10. REMOVE EXISTING RIPE
11. REMOVE EXISTING MANHOLE, CATCH BASIN, OR INLET
12 Pq..ACE !TLET PIPE ill CuW OF CONCRETE INLET
N
REMARKS
CONNEC T TO BRI DGE DRA I N T'p ,ATE ,N L3 SIL
SEE CHANNEL CHANGE PROFILE SHEET
sw— `� _I TO BRIDGE DR A I N
N�°�
jI V.0.
13,
USE E
ljk
--LED
EPIC SECT"INLET END
14
UW
END $fC TK)N OUTLET END
15.
USE
UNIT "0"
AS FV WSIC, STD PLAN B-6
106
WC
SPECIAL.
PROY► S
4
E
M.C1N O■ � D
y,
6�mpwpq